Loading...
HomeMy WebLinkAboutRFP NE 174th Street Roadway Improvements (final) City of Sunny Isles Beach |Request for Proposal No. 14-11-01 1 Request for Proposal Goods & Services NE 174th Street Roadway Improvements Request for Proposal No. 14-11-01 Publish Date: Bid Due and Bid Opening Date: 11/04/2014 12/16/2014 at 2:30 PM Pre-Bid Conference: Where to Deliver Proposal Mandatory 11/18/2014 @ 2:30 PM All Questions Due: 12/05/2014 by 5:00 PM Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, Florida 33160 City of Sunny Isles Beach |Request for Proposal No. 14-11-01 2 TABLE OF CONTENTS Table of Contents Page 2 Legal Advertisement/Notice to Bidder Page 3 Instructions to Bidder / General Terms Section 1 Page 4 Special Terms & Conditions Section 2 Page 10 Scope of Work / Technical Specifications Section 3 Page 16 Evaluation Process Section 4 Page 17 Proposal Format Section 5 Page 19 Bid Submittal Form Section 6 Page 21 Acknowledgement for Addenda Section 7 Page 38 Affidavits Non-Collusive Affidavit Page 1 of 10 Public Entity Crimes Page 2 of 10 Equal Opportunity / Affirmative Action Statement Page 4 of 10 Conflict of Interest Statement Page 5 of 10 Dispute Disclosure Form Page 6 of 10 Anti-Kickback Affidavit Page 7 of 10 Bid Bond Page 8 of 10 Performance Bond Page 9 of 10 Attachments Attachment A: Bid Set (Plans & Technical Specifications) Attachment B: Geotechnical Report Attachment C: Contractor Permits and Estimated Fees Attachment D: Miami-Dade County Approved Contractor List for Traffic Signal Maintenance City of Sunny Isles Beach |Request for Proposal No. 14-11-01 3 LEGAL ADVERTISEMENT NOTICE TO BIDDER NOTICE IS HEREBY GIVEN that the City of Sunny Isles Beach is seeking sealed Bids for the following work as specified. NE 174th Street Roadway Improvements Request for Proposal No. 14-11-01 The Bid Specifications for this Request for Proposal are available from DemandStar by calling (800) 711 - 1712 or by accessing their website at www.demandstar.com. The Bid Specifications may also be examined at the City of Sunny Isles Beach – Office of the City Clerk. Proposers who obtain the Bid Specifications from sources other than DemandStar or the City of Sunny Isles Beach are cautioned that their Bid response package may be incomplete. Addenda will be posted and disseminated by DemandStar at least five days prior to the submittal date to all Proposers who are listed on the official list. The City may not accept incomplete Bids. Bids shall be on a unit price basis; segregated Bids will not be accepted. Sealed Bids will be received by the City Clerk no later than 2:30 PM, on Tuesday, 12/16/2014 at the Sunny Isles Beach Government Center located at 18070 Collins Avenue, 4th floor, Sunny Isles Beach, Florida, 33160. Bids received after this time will not be considered. The City is under no obligation to return Bids. Timely submitted Bids will be opened publicly and read aloud at this time. The envelope containing the sealed Bid must be clearly marked: “IMPORTANT, BID ENCLOSED” Bid No. 14-11-01 NE 174th Street Roadway Improvements OPENING DATE AND TIME: Tuesday, 12/16/2014 at 2:30 PM A Mandatory Pre-Bid Conference for all potential Proposers is set for 2:30 p.m. on 11/18/2014 in the 1st Floor Conference Room at the City of Sunny Isles Beach Government Center located at 18070 Collins Avenue, Sunny Isles Beach, Florida 33160. The Owner reserves the right to reject any or all Bids, with or without cause, to waive technical errors and informalities, and to accept the Bid, which best serves the interest of, and represents the best value to, the Owner in conformity with the criteria set forth in Section 62-8 of the Code of Ordinances of the City of Sunny Isles Beach. All questions regarding Request for Proposal No. 14-11-01 shall be directed in writing to Jane A. Hines, CMC, City Clerk, NO LATER THEN DECEMBER 5TH 2014 BY 5:00 PM Questions may be submitted via email to: JHines@sibfl.net or via facsimile (305) 792-1563 or via regular mail at: Jane A. Hines, MMC, City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, FL 33160. All Questions will be answered in the form of Addendum that will be released a few days after the question due date listed above. Jane Hines, MMC, City Clerk City of Sunny Isles Beach City of Sunny Isles Beach |Request for Proposal No. 14-11-01 4 SECTION 1 INSTRUCTIONS TO BIDDER / GENERAL TERMS AND CONDITIONS THESE INSTRUCTIONS ARE STANDARD FOR ALL BID COMMODITIES/SERVICES ISSUED BY THE CITY OF SUNNY ISLES BEACH. THE CITY OF SUNNY ISLES BEACH MAY DELETE, SUPERSEDE OR MODIFY ANY OF THESE STANDARD INSTRUCTIONS FOR A PARTICULAR CONTRACT BY INDICATING SUCH CHANGE IN SPECIAL INSTRUCTIONS TO BIDDERS OR IN THE BID SHEETS. ANY AND ALL SPECIAL CONDITIONS THAT MAY VARY FROM THE GENERAL CONDITIONS SHALL HAVE PRECEDENCE. BIDDER AGREES THAT THE PROVISIONS INCLUDED WITHIN THIS BID OR RFP SHALL PREVAIL OVER ANY CONFLICTING PROVISION WITHIN ANY STANDARD FORM CONTRACT OF THE BIDDER REGARDLESS OF ANY LANGUAGE IN BIDDER’S CONTRACT TO THE CONTRARY. 1.1 CLARIFICATION/EXPLANATION/QUESTIONS: Any questions concerning the Bid Specifications or any required need for clarification must be made to Jane A. Hines, CMC, City Clerk via email to: JHines@sibfl.net or via facsimile (305) 792-1563 or via regular mail at: Jane A. Hines, CMC, City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, FL 33160. Such requests for clarification/explanation or questions must be made in writing to Jane A. Hines, CMC, City Clerk, at least five (5) business days prior to the date of the Bid opening. Interpretations or clarifications considered necessary by the City will be issued by addenda and posted/disseminated by DemandStar (www.demandstar.com) to all parties listed on the official plan holders’ list as having received the Bid documents. Only questions answered by written addenda shall be binding. Oral interpretations or clarifications shall be without legal effect. No plea of ignorance or delay or required need of additional information shall exempt a Proposers from submitting their Bid on the required date and time as publicly noted. 1.2 PLAN HOLDER’S LIST: As a convenience to proposers, the City of Sunny Isles Beach has made available via internet lists of all plan holders for each Request for Proposal, Request for Proposal, and request for qualifications. The information is available on-line at www.demandstar.com or by calling the Office of the City Clerk at (305) 792-1703. 1.3 ADDENDA TO SPECIFICATIONS: If any addenda are issued after the initial specifications are released, the City will post and disseminate the addenda through DemandStar. For those projects with separate plans, blue prints, or other materials that cannot be accessed through the internet, the Office of the City Clerk will make good faith effort to ensure that all registered proposers (those who have been registered as receiving a Bid package) receive the documents. It is the responsibility of the proposer prior to the submission of any Bid to check the above website or contact the Office of the City Clerk at (305) 792-1703 to verify any addenda issued. The receipt of all addenda must be acknowledged on the Bid Response Sheet. 1.4 SPECIAL ACCOMMODATIONS: Any person requiring a special accommodation at a Pre-Bid Conference or Bid/RFP/RFQ opening because of a disability should call the Office of the City Clerk at (305) 792-1703 at lease five (5) days prior to the Pre-Bid Conference or Bid/RFP/RFQ opening. If you are hearing or speech impaired, please contact the Office of the City Clerk by calling the City of Sunny Isles Beach using the Florida Relay Service which can be reached at 1(800) 955-8771 (TDD). 1.5 PUBLIC ENTITY CRIMES STATEMENT: Pursuant to the provisions of paragraph (2) (a) of section 287.133, Florida statutes -"a person or affiliate who has been placed on the convicted proposer list following a conviction for a public entity crime may not submit a Bid on a contract to provide any goods or services to a public entity, may not submit a Bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform work as a Contractor, supplier, sub-Contractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.107, for category two for a period of 36 months from the date of being placed on the convicted Proposer list”. 1.6 BID DEADLINE: Bids must be submitted no later than the time and date shown within this document. 1.7 SEALED BID: The entire Bid Response Package shall be placed in an opaque envelope (with all items listed on the Bid checklist form and all other items required within this Request for Proposal must be executed) and submitted in a sealed envelope. 1.8 BID EXECUTION, SIGNATURES, ERASURE/CORRECTION: All Bids shall be signed in blue ink. All price quotes shall be typewritten or printed with ink. All corrections made by the proposers prior to the opening must be initialed and dated by the proposers. No changes or corrections will be allowed after Bids are opened. Bids must contain an original, manual signature of an authorized representative of the company. 1.9 WITHDRAWAL OF BIDS: Proposers may withdraw Bids only by written request and shall forward the withdrawal request via “Certified U.S. Mail – Return Receipt Requested” prior to the Bid opening time. Negligence on the part of the Proposers in preparing the Bid confers no right for the withdrawal of the Bid after it has been opened. 1.10 BID OPENING: Bids will be opened publicly at the time and place stated in the Notice to Bidder. It is the responsibility of the proposers to insure that the Bid reaches the Office of the City Clerk on or before the closing hour and date stated on the Request for Proposal. After the Bid opening, the contents of the Bid Form will be made public for the information of proposers and other interested parties who may be present either in person or by representative. Bids that are received after the Bid opening time will not be considered and will not be returned. 1.11 EVALUATION OF BIDS: The City, at its sole discretion, reserves the right to inspect any/all Proposers facilities to determine their capability of meeting the requirements for the Contract. Also, price, responsibility, and responsiveness of the Proposers, the financial position, experience, staffing, equipment, materials, references, and past history of service to the City and/or with other units of state, and/or local governments in Florida, or comparable private entities, will be taken into consideration in the Award of the Contract. 1.11.1 Hold Harmless: All Proposer’s shall hold the City, it's officials and employees harmless and covenant not to sue the City, it's officials and employees in reference to their decisions to reject, award, or not award a Bid, as applicable. 1.11.2 Cancellation: Failure on the part of the Proposers to comply with the conditions, specifications, requirements, and terms as determined by the City, shall be just cause for cancellation of the Award. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 5 1.11.3 Disputes: If any dispute concerning a question of fact arises under the Contract, other than termination for default or convenience, the Contractor and the City department responsible for the administration of the Contract shall make a good faith effort to resolve the dispute. If the dispute cannot be resolved by agreement, then the department with the advice of the City Attorney shall resolve the dispute and send a written copy of its decision to the Contractor, which shall be binding on both parties. 1.12 AGREEMENT: After the Bid award, the City will, at its option, prepare an Agreement specifying the terms and conditions resulting from the award of this Bid. The proposer will have ten (10) calendar days after notification of the award by the City to execute the Agreement and provide the required Performance Bond. The Proposer who has the Contract awarded to them and who fails to execute the Agreement and furnish the Performance Bond and Insurance Certificates within the specified time shall forfeit the Bid Security that accompanied their Bid, and the Bid Security shall be retained as liquidated damages by the City, and it is agreed that this sum is a fair estimate of the amount of damages the City will sustain in case the Proposer fails to enter into the Contract and furnish the Bonds as herein before provided. Bid Security deposited in the form of a cashier’s check drawn on a local bank in good standing shall be subject to the same requirements as a Bid Bond. The performance of the City of Sunny Isles Beach of any of its obligations under the agreement shall be subject to and contingent upon the availability of funds lawfully expendable for the purposes of the agreement for the current and any future periods provided for within the Bid specifications. 1.13 PAYMENTS: Payment will be made after commodities/services have been received, accepted, and properly invoiced as indicated in the contract and/or purchase order. Invoices must bear the purchase order number. 1.14 BRAND NAMES: If a brand name, make, of any "or equal" manufacturer trade name, or Proposer catalog is mentioned whether or not followed by the words "approved equal" it is for the purpose of establishing a grade or quality of material only. Proposer may offer equals with appropriate identification, samples, and/or specifications on such item(s). The City shall be the sole judge concerning the merits of items Bid as equals. 1.15 MATERIAL: Material(s) delivered to the City under this Bid shall remain the property of the seller until accepted to the satisfaction of the City. In the event materials supplied to City are found to be defective or do not conform to specifications, the City reserves the right to return the product(s) to the seller at the seller’s expense. 1.16 SAMPLES: Samples of items, when required, must be furnished by the Proposers free of charge to the City. Each individual sample must be labeled with the Proposers name and manufacturer's brand name and delivered by them within ten (10) calendar days of Proposers receipt of the “Notice to Proceed”, unless schedule indicates a different time. If samples are requested subsequent to the Bid opening, they should be delivered within ten (10) calendar days of the request. The City will not be responsible for returning samples. 1.17 QUANTITY GUARANTY: No guaranty or warranty is given or implied by the City as to the total amount that may or may not be purchased from any resulting Contract or Award. These quantities are for Bid purposes only and will be used for tabulation and presentation of the Bid. The City reserves the right to increase or decrease quantities as required, even significantly. The prices offered herein and the percentage rate of discount applies to other representative items not listed in this Bid. 1.18 GOVERNMENTAL RESTRICTIONS ON MATERIALS: In the event any governmental restrictions may be imposed which would necessitate alteration of the material quality, workmanship, or performance of the items offered on this Bid prior to their delivery, it shall be the responsibility of the successful Proposers to notify the City at once, indicating in their letter the specific regulation which required an alteration. The City of Sunny Isles Beach reserves the right to accept any such alteration, including any price adjustments occasioned thereby, or to cancel at no further expense to the City. 1.19 SAFETY STANDARDS: The Proposer warrants that the product(s) supplied to the City conforms in all respects to the standards set forth in the occupational safety and health act (OSHA) and its amendments. Bids must be accompanied by a materials data safety sheet (MSDS) when applicable. 1.20 WARRANTIES: Successful Proposers shall act as agent for the City in the follow-up and compliance of all items under Warranty/Guaranty and complete all forms for Warranty/Guarantee coverage under this Contract. 1.21 COPYRIGHTS/PATENT RIGHTS: Proposer warrants that there has been no violation of copyrights or patent rights in manufacturing, producing or selling of goods shipped or ordered, as a result of this Bid. The seller agrees to indemnify City from any and all liability, loss, or expense occasioned by any such violation. 1.22 LOCAL BUSINESS TAX (OCCUPATIONAL LICENSE REGISTRATION): The contractor shall be responsible for obtaining and maintaining throughout the contract period his or her city and county local business tax receipts. Each Proposer submitting a Bid on this Request for Proposal shall include a copy of the company’s local business tax/occupational license(s) with the Bid response. For information specific to City of Sunny Isles Beach local business tax/occupational licenses, please call Code Enforcement & Licensing at (305) 792-1705. If the contractor is operating under a fictitious name as defined in Section 865.059, Florida Statutes, proof of current registration with the Florida Secretary of State shall be submitted with the Bid. A business formed by an attorney actively licensed to practice law in this state, by a person actively licensed by the Department of Business and Professional Regulations or the Department of Health for the purpose of practicing his or her licensed profession, or by any corporation, partnership, or other commercial entity that is actively organized or registered with the Department of State shall submit a copy of the current licensing from the appropriate agency and/or proof of current active status with the Division of Corporations of the State of Florida. 1.23 LIABILITY, INSURANCE, PERMITS AND LICENSES: Proposers shall assume the full duty, obligation, and expense of obtaining all necessary licenses, permits, inspections, and insurance required. The Proposer shall be liable for any damages or loss to the City occasioned by negligence of the Proposers (or their agent) or any person the Proposers has designated in the completion of their contract as a result of the Bid. Proposer shall be required to furnish a copy of all licenses, certificates of competency or other licensor requirements necessary to practice their profession as required by Florida State Statute, Miami-Dade County, and City of Sunny Isles Beach Code. Proposers shall include current Miami-Dade County City of Sunny Isles Beach |Request for Proposal No. 14-11-01 6 Certificates of Competency. These documents shall be furnished to the City along with the Bid response. Failure to furnish these documents or to have required licensor will be grounds for rejecting the Bid. 1.24 CERTIFICATE(S) OF INSURANCE: Proposers shall furnish to the Office of the City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160, certificate(s) of insurance which indicate that insurance coverage has been obtained from an insurance company authorized to do business in the State of Florida or otherwise secured in a manner satisfactory to the City, for those coverage types and amounts listed in this document, in an amount equal to 100% of the requirements and shall be presented to the City prior to issuance of any Contract(s) or Award(s) Document(s). The City of Sunny Isles Beach shall be named as "additional insured" with respect to this coverage. The required certificates of insurance shall not only name the types of policies provided, but shall also refer specifically to this Bid and section. At the time of Bid submission the Proposers must submit certificates of insurance as outlined in the General Conditions section. All required insurances shall name the City of Sunny Isles Beach as additional insured and such insurance shall be issued by companies authorized to issue insurance in the State of Florida. It shall be the responsibility of the Proposers and insurer to notify the City Manager of the City of Sunny Isles Beach of cancellation, lapse, or material modification of any insurance policies insuring the Proposers, which relate to the activities of such proposer and the City of Sunny Isles Beach. Such notification shall be in writing, and shall be submitted to the City finance support service director thirty (30) days prior to cancellation of such policies. This requirement shall be reflected on the certificate of insurance. Failure to fully and satisfactorily comply with the city's insurance and bonding requirements set forth herein will authorize the City Manager to implement a rescission of the Bid award without further City Commission action. The Proposer hereby holds the City harmless and agrees to indemnify City and covenants not to sue the City by virtue of such rescission. 1.25 ASSIGNMENT: The Contractor shall not transfer or assign the performance required by this Bid without prior written consent of the City Manager. Any award issued pursuant to the Request for Proposal and monies which may be due hereunder are not assignable except with prior written approval of the City Manager. Further, in the event that the majority ownership or control of the Contractor changes hands subsequent to the award of this contract, Contractor shall promptly notify City in writing (via United States Postal Service – Certified Mail, Return Receipt Requested) of such change in ownership or control at least thirty (30) days prior to such change and City shall have the right to terminate the contract upon sixty (60) days written notice, at City’s sole discretion. 1.26 HOLD HARMLESS/INDEMNIFICATION: The Contractor shall indemnify, hold harmless, and defend the City of Sunny Isles Beach, it's officers, agents and employees from and against any claims, demands or causes of action of whatsoever kind or nature arising out of error, omission, negligent act, conduct, or misconduct of the Contractor, their agents, servants or employees in the provision of goods or the performance of services pursuant to this Bid and / or from any procurement decision of the City including without limitation, awarding the Contract to the Contractor. 1.27 NON-CONFORMANCE TO CONTRACT: The City of Sunny Isles Beach may withhold acceptance of, or reject items which are found upon examination, not to meet the specification requirements. Upon written notification of rejection, items shall be removed within (5) calendar days by the Proposer at their own expense and redelivered at their expense. Rejected goods left longer than thirty (30) calendar days will be regarded as abandoned and the City shall have the right to dispose of them as its own property. Rejection for non-conformance or failure to meet delivery schedules may result in the Contractor being found in default. 1.28 DEFAULT PROVISION: In case of default by the Proposers, the City of Sunny Isles Beach may procure the articles or services from other sources and hold the Proposers responsible for any excess costs occasioned or incurred thereby. 1.29 SECONDARY/OTHER VENDORS: The City reserves the right in the event the primary Proposer cannot provide an item(s) or service(s) in a timely manner as requested, to seek other sources without violating the intent of the Contract. 1.30 DEFINITIONS: Wherever used in these General Conditions or in the other Contract Documents, the following terms shall have the meaning indicated which shall be applicable to both the singular and plural thereof: Acceptance: Acceptance by the City of the Work as being fully complete in accordance with the Contract Documents subject to waiver of claims. Agreement: The written Agreement between the City and the Contractor covering the Work to be performed, which includes the Contract Documents. Addenda: Written or graphic instruments issued prior to the Bid Opening which modify or interpret the Contract Documents, Drawings and Specifications, by addition, deletions, clarifications or corrections. Approved: Means approved by the City. Bid: The offer of the Proposers submitted on the prescribed form setting forth the prices for the Work to be performed. Proposers: Any person, firm or corporation submitting a Bid for Work. The term is inclusive of terms vendor and contractor. Bonds: Bid, performance bond and other instruments of security, furnished by the Contractor and their surety in accordance with the Contract Documents and in accordance with the law of the State of Florida. Change Order: A written order to the Contractor signed by the City authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time issued after execution of the Agreement. City: City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160. Contract Documents: Contract Documents shall include, Instructions to Proposers, Contractor's Bid, the Bonds, the Notice of Award, the Agreement between the City and Contractor as well as any addenda thereto, these General Conditions, Special Conditions, the Technical Specifications, Drawings and Modifications, Notice to Proceed, Request for Proposal, Insurance City of Sunny Isles Beach |Request for Proposal No. 14-11-01 7 Certificates, Change Orders and Acknowledgment of Conformance with the City of Sunny Isles Beach. Contract Price: The total monies payable to the Contractor under the Contract Documents. Contract Time: The number of calendar days stated in the Agreement for the completion of the Work. Contracting Officer: The individual who is authorized to sign the contract documents on behalf of the City’s governing body. Contractor: The person, firm or corporation with whom the City has executed this Agreement. Day: A calendar day of twenty-four hours measured from midnight to the next midnight. Field Order: A written order issued by the City which clarifies or interprets the Contract Documents or orders minor changes in the Work. Modification: Modification means any one of the following: (a) a written amendment of the Contract Documents signed by both parties, (b) a Change Order, (c) a written clarification or interpretation if issued by the City, or (d) a written order for minor change or alteration in the Work issued by the City. A modification may only be issued after execution of the Agreement. Notice of Award: The written notice by City to the apparent successful Proposers stating that upon compliance with the conditions precedent to be fulfilled by him within the time specified, City will execute and deliver the Agreement to him. Samples: Physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. Specifications: Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work. Statement of Services: The form furnished by the City which is to be used by the Contractor in requesting progress payments. Supplier: Any person or organization who supplies materials or equipment for the Work, including that fabricated to a special design, but who does not perform labor at the site. Work: Any and all obligations, duties and responsibilities necessary to the successful completion of the Project assigned to or undertaken by Contractor under the Contract Documents, including all labor, materials, equipment and other incidentals, and the furnishing thereof. Written Notice: The term “Notice” as used herein shall mean and include all written notices, demands, instructions, claims, approvals and disapproval’s required to obtain compliance with Contract requirements. Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or to an authorized representative or such individual, firm, or corporation, or if delivered at or sent by registered mail to the last business address known to them who gives the notice. Unless otherwise stated in writing, any notice to or demand upon the City under this Contract shall be delivered to the City. 1.31 BID AWARD: The City reserves the right to reject any and all Bids at its sole discretion. Bids shall be awarded by the City after the City performs all necessary searches, inquiries, exploration, and analysis of the Bids. The Bid shall be awarded to the lowest responsible and responsive proposer whose Bid best serves the interests of and represents the best value to the City in conformity with the criteria set forth in Section 62-8 of the City Code. No Notice of Award will be given until the City has concluded any investigation(s) as they deem necessary to establish the Proposer’s capability to perform the Services as described in this RFP, ITB, RFQ or ITQ, as substantiated by the required professional experience, client references, technical knowledge and qualifications; and sufficient labor and equipment to comply with the City’s established standards, as well as the financial capability of the Proposer to perform the Work in accordance with the Contract Documents to the satisfaction of the City within the time prescribed. The City reserves the right to reject the Bid of any Proposers on the basis of these queries and investigations and who does not meet the City’s satisfaction, even though the firm may be the lowest dollars and cents Bid. In analyzing Bids, the City will also take into consideration client references, past work experience and work product, proven ability to satisfactorily perform. If the Contract is awarded, the City will issue the Notice of Award and give the successful Proposers a Contract for execution within ninety (90) days after opening of Bids. The City specifically reserves the right to award the contract to a proposer who is not necessarily the lowest dollars and cents proposers on the basis of the results of these queries and investigation(s). 1.32 EXECUTION OF AGREEMENT: At least four counterparts of the Agreement, the Performance Bond, the Certificates of Insurance and such other Documents as required by the Contract Documents shall be executed and delivered by Contractor to the City within ten (10) calendar days of receipt of the Notice of Award. 1.33 LAWS AND REGULATIONS: The Contractor will give all notices and comply with all laws, ordinances, rules and regulations applicable to the Work. If the Contractor observes that the Specifications are at variance therewith, they will give the City prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate modification. If the Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the City, they will bear all costs arising wherefrom. 1.34 TAXES: The City of Sunny Isles Beach is exempt from sales tax imposed by the State and/or Federal Government. Florida Sales Tax Exemption No. 23-00-477131-54C appears on each purchase order. Exemption certificates are available upon request. 1.35 DUTY TO DEFEND, INDEMNIFY AND SAVE HARMLESS: City of Sunny Isles Beach |Request for Proposal No. 14-11-01 8 In consideration of the separate sum of twenty-five dollars ($25.00) and other valuable consideration, the Contractor shall defend, indemnify and hold harmless the City, its officers, agents and employees, from or on account of any injuries or damages, received or sustained by any person or persons during or on account of any operations connected with the Work described in the Contract Documents, or by or in consequence of any negligence in connection with the same; or by use of any improper materials or by or on account of any act or omission of the said Contractor or his Sub- Contractor, agents, servants or employees. The Contractor will defend, indemnify and hold harmless the City and their agents or employees from and against all claims, damages, losses and expenses including attorneys' fees arising out of or resulting from the performance of the Work, provided that any such claim damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than Work itself) including the loss of use resulting wherefrom and (b) is caused in whole or in part by any negligent act or omission of the Contractor, Sub-Contractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused by a party indemnified hereunder. In the event that a court of competent jurisdiction determines that Sec. 725.06 (2), F.S. is applicable to this Work, then in lieu of the above provisions of this section the parties agree that Contractor shall indemnify, defend and hold harmless the City, their officers and employees, to the fullest extent authorized by Sec. 725.06 (2) F.S., which statutory provisions shall be deemed to be incorporated herein by reference as if fully set forth herein. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Contractor, upon written notice from City shall defend such action or proceeding by counsel satisfactory to City. The indemnification provided above shall obligate Contractor to defend at its own expense or to provide for such defense, at City’s option, any and all claims of liability and all suits and actions of every name and description that may be brought against City, excluding only those which allege that the injuries arose out of the sole negligence of City, which may result from the operations and activities under this Contract whether the Work be performed by Contractor, its Sub-Contractors, or by anyone directly or indirectly employed by either. 1.36 DECISIONS ON DISAGREEMENTS: The City will be the initial interpreter of the Technical Specifications. 1.37 CITY MAY TERMINATE: If the Contractor is adjudged bankrupt or insolvent, or if they make a general assignment for the benefit of their creditors, or if a trustee or receiver is appointed for the Contractor or for any of their property, or if they file a petition to take advantage of any debtor’s act, or to reorganize under bankruptcy or similar laws, or if they repeatedly fails to supply sufficient skilled workmen or suitable materials or equipment, or if they repeatedly fail to make prompt payments to Sub-Contractors or for labor, materials or equipment or they disregard laws, ordinances, rules, regulations or orders of any public body having jurisdiction, or if they disregard the authority of the City, of if they otherwise violate any provision of, the Contract Documents, then the City may, without prejudice to any other right or remedy and after giving the Contractor and the surety ten (10) days written notice, terminate the services of the Contractor and take possession of the Project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Contractor, and finish the Work by whatever method they may deem expedient. In such case the Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds the direct and indirect costs of completing the Project, including compensation for additional professional services, such excess shall be paid to the Contractor. If such costs exceed such unpaid balance, the Contractor will pay the difference to the City. Such costs incurred by the City will be determined by the City and incorporated in a Change Order. If after termination of the Contractor under this Section, it is determined by a court of competent jurisdiction for any reason that the Contractor was not in default, the rights and obligations of the City and the Contractor shall be the same as if the termination had been issued pursuant to this document. 1.37.1 Where the Contractor’s services have been so terminated by the City said termination shall not affect any rights of the City against the Contractor then existing or which may thereafter accrue. Any retention or payment of moneys by the City due the Contractor will not release the Contractor from liability. 1.37.2 Upon ten (10) days written notice to the Contractor, the City may, without cause and without prejudice to any other right or remedy, elect to terminate the Agreement. In such case, the Contractor shall be paid for all Work executed and accepted by the City as of the date of the termination. No payment shall be made for profit for Work which has not been performed. 1.38 MISCELLANEOUS: Proposers acknowledge the following miscellaneous conditions: 1.38.1 Whenever any provision of the Contract Documents requires the giving of written notice it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to them who gives the notice. 1.38.2 The Contract Documents shall remain the property of the City. The Contractor shall have the right to keep one record set of the Contract Documents upon completion of the Project. 1.38.3 The duties and obligations imposed by these General Conditions, Special Conditions and Supplemental Conditions and the rights and remedies available hereunder, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon Contractor and those in the Special Conditions and the rights and remedies available to the City, shall be in addition to, and shall not be construed in any way as a limitation of, any rights and remedies available by law, by special guarantee or by other provisions of the Contract Documents. 1.38.4 Should the City or the Contractor suffer injury or damage to its person or property because of any error, omission, or act of the other or of any of their employees or agents or others for whose acts they are legally liable, claim shall be made in writing to the other party within a reasonable time of the first observance of such injury or damage. 1.39 WAIVER OF JURY TRIAL: City and Contractor knowingly, irrevocably voluntarily and intentionally waive any right either may have to a trial by jury in State or Federal Court proceedings in respect to any action, proceeding, lawsuit or counterclaim based upon the Contract Documents or the performance of the Work there under. 1.40 GOVERNING LAW: The Contract shall be construed in accordance with and governed by the law of the State of Florida. 1.41 VENUE: Venue of any action to enforce the Contract Documents shall be in Miami-Dade County, Florida. 1.42 ARBITRATION: City of Sunny Isles Beach |Request for Proposal No. 14-11-01 9 It is the intention of the parties that whenever possible, if a dispute or controversy arises hereunder then such dispute or controversy shall be settled by arbitration in accordance with the procedures, rules and regulations of the American Arbitration Association. The decision rendered by the Arbitrator shall be final and binding upon the parties and judgment upon the award rendered by the arbitrator may be entered in any court having jurisdiction. Arbitration shall be held in Miami-Dade County, Florida. All costs of arbitration and attorneys’ fees incurred by the parties shall be paid by the non- prevailing party or, if neither party prevails on the whole, each party shall be responsible for a portion of the costs of arbitration and their respective attorneys’ fees as may be determined by the court on confirmation. 1.43 PROJECT RECORDS: City shall have right to inspect and copy during regular business hours at City’s expense, the books and records and accounts of Contractor which relate in any way to the Project, and to any claim for additional compensation made by Contractor, and to conduct an audit of the financial and accounting records of Contractor which relate to the Project. Contractor shall retain and make available to City all such books and records and accounts, financial or otherwise, which relate to the Project and to any claim for a period of three years following final completion of the Project. During the Project and the three year period following final completion of the Project, Contractor shall provide City access to its books and records upon five days written notice. 1.44 SEVERABILITY: If any provision of the Contract or the application thereof to any person or situation shall to any extent, be held invalid or unenforceable, the remainder of the Contract, and the application of such provisions to persons or situations other than those as to which it shall have been held invalid or unenforceable shall not be affected thereby, and shall continue in full force and effect, and be enforced to the fullest extent permitted by law. 1.45 INDEPENDENT CONTRACTOR: The Contractor is an independent Contractor under the Contract. Services provided by the Contractor shall be by employees of the Contractor and subject to supervision by the Contractor, and not as officers, employees, or agents of the City. Personnel policies, tax responsibilities, social security and health insurance, employee benefits, purchasing policies and other similar administrative procedures, applicable to services rendered under the Contract shall be those of the Contractor. End of Section City of Sunny Isles Beach |Request for Proposal No. 14-11-01 10 Section 2 Special Terms and Conditions 2.1 PURPOSE OF BID: The City of Sunny Isles Beach (the “City”) intends to secure the services of a qualified contractor to construct the NE 174th Street Roadway Improvements Project. It is the intent of this proposal document that all work shall result in compliance with the specifications documents and all local, state and federal regulatory requirements applicable to such service. 2.2 PRE-BID CONFERENCE A Mandatory pre-bid conference will be held on 11/18/2014 at 2:30 pm at Sunny Isles Beach Government Center, 18070 Collins Avenue, Sunny Isles Beach, FL 33160; 1st Floor Conference Room to discuss the special conditions and specifications included within this solicitation. Those who fail to attend this mandatory pre-bid conference will not be considered by the City and their bid will rejected. Proposers are requested to bring this solicitation document to the conference, as additional copies may not be available. 2.3 TERM This contract shall commence upon the date of the Notice to Proceed and shall remain in effect until such time as the commodities, equipment and/or services acquired in conjunction with this Request for Proposal have been completed and accepted by the City’s authorized representative , all required permits are properly closed out and upon completion of the express and/or implied warranty periods. 2.4 OPTIONS TO RENEW Intentionally Omitted 2.5 METHOD OF AWARD See section 4 2.6 PRICE Prices shall remain fixed and firm through the term of the contract 2.7 PERFORMANCE BOND AND PAYMENT BOND The City of Sunny Isles Beach shall require the successful Proposer to furnish a Performance and Payment Bond in the amount of 100% of the total Proposal Price, with the City of Sunny Isles Beach as the Obligee, as security for the faithful performance of the Contract and for the payment of all persons performing labor or furnishing materials in connection herewith within ten (10) calendar days after notification of the award by the City. The bonds shall be with a surety company authorized to do business in the State of Florida. 2.8 BID BOND City of Sunny Isles Beach |Request for Proposal No. 14-11-01 11 The City of Sunny Isles Beach shall require that every Proposer furnish a Bid Bond in the amount of 5% of the total Proposal Price. 2.9 DELIVERY Intentionally Omitted 2.10 INSURANCE 2.10.1 Comprehensive General Liability Insurance Comprehensive General Liability with minimum limits of Five Million Dollars ($5,000,000.00) per occurrence combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a form no more res trictive than the latest edition of the Comprehensive General Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: o Premises and Operation o Independent Contractors o Products and/or Completed Operations Hazard o Broad Form Property Damage o Broad Form Contractual Coverage applicable to this specific Contract, including any hold harmless and/or indemnification agreement. o Personal Injury Coverage with Employee and Contractual Exclusions removed, with minimum limits of coverage equal to those required for Bodily Injury Liability and Property Damage Liability. At the Contractor’s expense, Workers’ Compensation will be provided in accordance with Florida Statutes. 2.10.2 Business Automobile Liability Business Automobile Liability with minimum limits of One Million Dollars ($1,000,000.00) per occurrence combined single limit for Bodily Injury Liability and Property Damage Liability. Coverage must be afforded on a form no more restrictive than the lates t edition of the Business Automobile Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: o Owned Vehicles; o Hired and Non-Owned Vehicles; o Employers’ Non-Ownership. Before starting the Work, the proposer will file and make sure that all certificates of insurance required by this document and by the Contract are in the City’s possession. These certificates shall contain a provision that the coverage afforded under the policies will not be canceled or materially changed until at least thirty (30) days prior written notice has been given to the City by certified mail. The City shall be named as an additional insured on the above-referenced policies. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 12 The Proposer agrees that if any part of the Work under the Contract is sublet, they will require the Sub-contractor(s) to carry insurance as required, and that they will require the Sub- contractor (s) to furnish to them insurance certificates similar to those required by the City in this section. 2.10.3 Worker’s Compensation Insurance Worker's Compensation Insurance for statutory obligations imposed by Worker's Compensation or Occupational Disease Laws, including, where applicable, the United States Longshoremen's and Harbor Worker's Act, the Federal Employers’ Liability Act and the Homes Act. Employer's Liability Insurance shall be provided with a minimum of One Million and 00/100 dollars ($1,000,000.00) per accident. Contractor agrees to be responsible for the employment, conduct and control of its employees and for any injury sustained by such employees in the course of their employment. 2.10.4 Cancellation and Re-Insurance If any insurance should be cancelled or changed by the insurance company or should any insurance expire during the period of this contract, the proposer shall be responsible for securing other acceptable insurance to provide the coverage specified in this section to maintain coverage during the life of this Contract. All deductibles must be declared by the proposer and must be approved by the City. At the option of the City, either the proposer shall eliminate or reduce such deductible or the proposer shall procure a Bond, in a form satisfactory to the City, covering the same. 2.11 MONTHLY INVOICES PAYMENTS Cut-off date is the close of the last business day of the month. Proposer shall submit by the 10th day of the following month proposer's completed Statement of Services/Invoice. Should the 10th fall on a weekend or holiday, proposer shall submit his application on the next workday. Proposer is advised that processing of invoices must follow this schedule, as the City has funding requirements and other payment obligations which may prevent payment of late Statement of Services for that month’s billing cycle. A late Statement of Services with a recommendation for payment will be paid in the next month’s billing cycle. 2.12 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE PROPOSER Unless otherwise provided in Section 3 of this solicitation the proposer shall furnish the following, including but not limited to, all labor, materi al, equipment, barricading, Maintenance of Traffic (MOT) inclusive of any required off duty police officers, adequate supervision, and coordination for satisfactory contract performance. When not specifically identified in the technical specifications, such materials and equipment shall be of a suitable type and grade for the purpose and meeting or exceeding all permit or industry standard requirements. All material, workmanship, 100% design, testing and equipment shall be subject to the inspection and approval of the City Manager or his designated representative for this project. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 13 2.13 CLEAN-UP All unusable materials and debris shall be removed from the premises at the end of each workday, and disposed of in an appropriate manner. No equipment, material, debris, trailers or other items may be stored in any location outside of the provided constr uction easements without written approval from the City and the property owner. Upon final completion, the proposer shall thoroughly clean up all areas where work has been involved as mutually agreed with the associated user department’s project manager. 2.14 FEDERAL, STATE AND LOCAL REGULATIONS The successful Proposer shall comply with all federal, state and lo cal ordinances, regulations, rules and permits as well as any other laws that would apply to the services being provided. The proposer’s costs associated with regulatory requirements shall be included in the project cost whether depicted specifically or not within the body of the proposal. 2.15 MATERIALS SHALL BE NEW AND WARRANTED AGAINST DEFECTS The proposer hereby acknowledges and agrees that all materials, except where recycled content is specifically requested, supplied by the proposer in conjunction with this solicitation and resultant contract shall be new, warranted for their merchantability, and fit for a particular purpose. In the event any of the materials supplied to the City by the proposer are found to be defective or do not conform to specifications: (1) the materials may be returned to the proposer at the proposer’s expense and the contract cancelled or (2) the City may require the proposer to replace the materials at the proposer’s expense. No provisions or allotments for delays or time extensions to the schedule as a result of “defective”, unacceptable material, or reused material found shall be granted. In the event that material is suspected by the City Representative of being reused or not new in original packaging, the material may be rejected. The Proposer shall remove such material and replace it at his/her cost and within the original schedule. No provisions or allotment s for delays or time extensions to the schedule as a result of “defective”, unacceptable material, or reused material found shall be granted. 2.16 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A NOTICE TO PROCEED: The proposer shall neither commence any work, nor enter a City work premise, until a written Notice to Proceed (NTP) directing the proposer to proceed with the work has been received by the proposer from any authorized City manager or his designee representative; provided however, that such notification shall be superseded by any emergency work that may be required in accordance with provisions included elsewhere in this solicitation and resultant contract. In addition to the written NTP, the Contractor must supply the City with the required insurance and bond documents. 2.17 ACCIDENT PREVENTION AND BARRICADES Barricades, cones, construction fencing, temporary construction fencing and off duty police officers, per City regulations and other relevant requirements, shall be provided by the proposer when work is performed in areas traversed by persons or when deemed necessary by the City Manager or his designee at no extra cost to the City. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 14 Proposer shall comply with regulations and permit requirements for the placement of the proper fencing. Precautions shall be exercised at all times for the protection of persons and property. All proposers performing services under this contract shall conform to all relevant O SHA, State and City regulations during the course of such effort. Any fines levied by the above mentioned authorities for failure to comply with these requirements shall be borne solely by the responsible proposer. 2.18 WARRANTY SHALL BE SUPPLIED IN WRITTEN FORM 2.18.1 Type of Warranty Coverage Required The proposer shall provide a copy of its written warranty certificates with its initial offer, or upon request from the City. Failure to meet this requirement may result in the offer being deemed non-responsive. The warranty supplied by the proposer shall remain in force for the full period identified by the proposer; regardless of whether the proposer is under contract with the City at the time of defect. Any payment by the City on behalf of the goods or services received from the proposer does not constitute a waiver of these warranty provisions. Proposer’s warranties shall be one (1) year from final completion, backed by a warranty bond and shall include all delivery, labor, material, and equipment for the correction, replacement, reinstallation, and/or removal of defective and/or unacceptable work. Warranties for specific components of the work shall be provided separately and on fabricators or manufacturers original letterhead with original signatures. 2.18.2 Correcting Defects Covered Under Warranty The proposer shall be responsible for promptly correcting any deficiency, at no cost to the City, within seven (7) calendar days after the City notifies the proposer of such deficiency in writing. If the proposer fails to satisfy the warranty within the period specified in the notice, the City may (a) place the proposer in default of its contract, and/or (b) procure the products or services from another source and charge the proposer for any additional costs that are incurred by the City for this work or items; either through a credit memorandum or through invoicing. 2.19 DEFICIENCIES IN WORK TO BE CORRECTED BY THE PROPOSER The proposer shall promptly correct all apparent and latent deficiencies and/or defects in work, and/or any work that fails to conform to the contract documents regardless of project completion status. All corrections shall be made within seven (7) calendar days afte r such rejected defects, deficiencies, and/or non-conformances are verbally reported to the proposer by the City's project administrator, who may confirm all such verbal reports in writing. The proposer shall bear ALL costs of correcting such rejected work. If the proposer fails to correct the work within the period specified, the City may, at its discretion, notify the proposer, in writing, that the proposer is subject to contractual default provisions if the corrections are not completed to the satisfac tion of the City within seven (7) calendar days of receipt of the notice. If the proposer fails to correct the work within the period specified in the notice, the City shall place the proposer in de fault. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 15 2.20 FURNISH AND INSTALL REQUIREMENTS The specifications and/or statement of work contained within this solicitation describe the various functions and classes of work required as necessary for the completion of the work. Any omissions of inherent technical functions or classes of work within the specifications and/or statement of work shall not relieve the proposer from furnishing, installing or performing such work where required to the satisfactory completion of the project. 2.21 LICENSES, PERMITS AND FEES The proposer shall obtain and pay for all licenses, permits and inspection fees required for this project; and shall comply with all laws, ordinances, regulations and building code requirements applicable to the work contemplated herein. Damages, penalties and or fines imposed on the Cit y or the proposer for failure to obtain required licenses, permits or fines shall be borne by the proposer. 2.22 LIQUIDATED DAMAGES FOR INCOMPLETE PROJECTS Failure to complete the project in accordance with the specifications and to the satisfaction of the City within the time stated for substantial and/or final completion shall cause the Proposer to be subject to charges for liquidated damages in the amount of One Thousand Seven Hundred Forty Two Dollars ($1,742.00 ) (FDOT 2014 Road & Bridge Specifications, Sec. 8-10,) for each and every calendar day the work remains incomplete beyond these deadlines. As compensation due to the City for loss of use and for additional costs incurred by the City due to such non-completion of the work, the City shall have the right to deduct the said liquidated damages from any amount due, or that may become due to the Proposer under this agreement, or to invoice the Proposer for such damages if the costs incurred exceed the amount due to the Proposer. 2.23 WEEKLY PROGRESS REPORTS The City shall require that the successful proposer provide weekly progress reports on the status of the project. The report shall include at the minimum the following information;  Background on the project itself  Discussion of the achievements since last reporting  Discussion of problems that have arisen  Discussion of work that lies ahead  2 week look ahead schedule  Assessment of whether you will meet the objectives in the proposed schedule and budget END OF SECTION City of Sunny Isles Beach |Request for Proposal No. 14-11-01 16 Section 3 Scope of Services / Technical Specifications 3.1 SCOPE OF SERVICES Proposed are the roadway improvements for NE 174th Street to include all labor and material to perform roadway reconstruction with geotechnical fabric, sidewalks, ADA ramps, detectable warning surfaces, f-curbs, valley gutters, curb inlets, storm pipes, control structure, water quality treatment structure, new asphalt, milling and resurfacing west of North Bay Road & within North Bay Road south of NE 174th Street, and striping with all other associated work according to the attachments. Proposed improvements also include full landscape and irrigation enha ncements within the full right-of-way of NE 174th St. Final completion deadline for Proposer to finish all Work is for two-hundred and seventy (270) days from issuance of notice to proceed from the City Manager or his designee. Substantial completion shall be thirty (30) days prior to the final completion deadline. Construction stakeout and as-built/record drawings will be provided by the successful proposer, as will all other surveying services required for project completion and close out. If any portion of the contract documents or plans is not clear or contradictive, the proposer is to submit a question/clarification in writing prior to submitting a bid proposal. In any instance where the attached scope of work is in conflict with FDOT specifications the more stringent specification will prevail. Furthermore, Bid Items Descriptions preceded by “NBR” refer to items on North Bay Road south of NE 174th Street and may be removed from the bid at Owner’s direction based on the schedule for award and construction of the North Bay Road Pedestrian Emergency Bridge Project (RFP No 14- 09-01). The contractor is also advised that the residential buildings within the NE 174th St Corridor (i.e. Winston Towers 100, 200, 300, 400, 600 and 700) are currently undergoing their 40-yr recertification. Temporary parking allowances have been permitted by the City to these buildings to allow 24-hr curbside parking within the right-of-way of NE 174th St. Construction activities on these buildings are anticipated to be on-going through at least August 2015. The successful proposer shall be required to coordinate with the Buildings and their associated contractors; and phase all right-of-way work related to this bid so that curb-side parking can be maintained as previously agreed to by the City. Please refer to Attachment F provided. END OF SECTON City of Sunny Isles Beach |Request for Proposal No. 14-11-01 17 Section 4 Evaluation Process 4.1 Review of Proposals For Responsiveness Each proposal will be reviewed to determine if the proposal is responsive to the submission requirements outlined in the solicitation. A responsive proposal is one which follows the requirements of this solicitation that includes all documentation, is sub mitted in the format outlined in this solicitation, is of timely submission, and has the appropriate signatures as required on each document. Failure to comply with these requirements may result in the proposal being deemed non- responsive. The contract will be awarded to the lowest responsible and responsive proposer whose proposal best serves the interest of and represents the best values to the City in conformity with section 62 -8 of the City Code. 4.2 Qualifications Proposals will be evaluated on the criteria listed below. Technical Qualifications 1. Proposer’s relevant experience, qualifications and past performance 2. Relevant experience and qualifications of key personnel, including key personnel of subcontractors that will be assigned to this project and experience and qualifications of subcontractors 3. Proposers approach methodology to providing the services requested in this solicitation 4. Proposed solution functionality, implementation and other objectives and requirements as stated Price 5. Proposer’s proposed price 4.2.1 Minimum Requirements In order to be considered responsive, Proposers shall, at a minimum, demonstrate compliance with the following Pre-Qualification Criteria in their proposal. All requested documentation and/or information shall be provided in the Proposal to confirm that the Proposer has satisfied the Prequalification Criteria in order to be properly evaluated as listed herein. Proposers failing to meet these requirements shall be deemed non responsive. The Proposer shall, at the time of Proposal submittal, time of award, and throughout the duration of the Contract, continue to meet the following Pre-qualification Criteria requirements as stated in the Solicitation Documents.  General Contractors License  Minimum of 5 Years of Experience in Similar Construction  Meet minimum bonding and insurance requirements City of Sunny Isles Beach |Request for Proposal No. 14-11-01 18  Licensed to perform scope of work within Florida 4.3 Price Evaluation The price proposal will be evaluated in combination with the technical proposal, including an evaluation of how well it matches Proposer’s understanding of the City’s needs described in this solicitation, the Proposer’s assumptions, and the value of the proposed services. The pricing evaluation is used as part of the evaluation process. The City reserves the right to negotiate the final terms, conditions and pricing of the contract as may be in the best interest of the City. Price is only one factor and the contract will be awarded in conformity with Section 62-8 of the City Code. 4.4 Negotiations The City may award a contract on the basis of initial offers received, without discussions. Therefore, each initial offer should contain the Proposer’s best terms from a monetary and technical standpoint. Notwithstanding the foregoing, if the City and said Proposer(s) cannot reach agreement on a contract, the City reserves the right to terminate negotiations and may, at the City Manager’s or designee’s discretion, begin negotiations with the next lowest responsible and responsive proposer. This process may continue until a contact acceptable to the City has been exe cuted or all proposals are rejected. No Proposer shall have any rights against the City arising from such negotiations or termination thereof. Any Proposer recommended for negotiations may be required to provide to the City: a) Its most recent certified business financial statements as of a date not earlier than the end of the Proposer’s preceding official tax accounting period, together with a statement in writing, signed by a duly authorized representative, stating that the present financial condition is materially the same as that shown on the balance sheet and income statement submitted, or with an explanation for material change in the financial condition. A copy of the most recent business income tax return will be accepted if certified financial statements are unavailable. b) Information concerning any prior or pending litigation, either civil or criminal, involving a governmental agency or which may affect the performance of services to be rendered herein, in which the Proposer, any of its employees or subcontractors is or has been involved within the last three years. END OF SECTON City of Sunny Isles Beach |Request for Proposal No. 14-11-01 19 Section 5 Proposal Format 5.0 FORMAT Proposers must submit (1) original and four (4) copies of the Proposal and one (1) CD or electronic copy. The original Proposal must contain an original signature. Be sure that the individual signing the Proposal is authorized to commit the Proposer's organization to the Proposal as submitted. Each page of the Proposal should state the name of the Proposer, the RFP number, and the page number. The City reserves the right to request additional data or material to support Proposals. All material submitted in response to the RFP will become the property of the City. LABEL EACH SECTION AS NUMBERED The proposal must be in the following format. 1. Company Information  In response to this Proposal, all Proposers must provide the following:  Name of Agency/Company (including any "Doing Business As" names)  Company Locations  Internet Web Site Address (if any)  Details of Entity Business Structure (Corporation, Partnership, LLC)  Date Founded  Home office address and telephone number, and local address and phone number  List of any outstanding litigation within the last five (5) years  Proof of insurance  Proof of bid guarantee 2. Qualifications  Proposer’s relevant experience, qualifications and past performance  An explanation of why the Proposer is the best qualified to perform the contract and demonstrate its qualifications including an item-by-item disclosure outlining how the firm meets or exceeds the requirements of this RFP.  A schedule of proposed services. The schedule should include the Proposer's understanding of the issues and tasks of the project at hand.  A list of similar completed projects for work completed in the last eight (8) years.  Owned equipment to be utilized on the project noting if it is owned by the prime, subcontractor or rented. 3. Staffing Relevant experience and qualifications of key personnel, including key personnel of subcontractors, that will be assigned to this project and experience and qualifications of subcontractors. The composition of the staff team should include:  The names of the employees in the area responsible for this contract .  Their function in the company. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 20  The name of the person who will be responsible for the coordination of work.  Experience and qualifications of staff and satisfactory record of performance of staff.  Education, certificates and licenses held by key staff. 4. Schedule / Methodology  Proposers approach methodology to providing the services requested in this solicitation  Suitability of the methodologies and approaches used in achieving tasks  Overall organization to completing the project  Ability to meet desired timelines and deadlines 5. Cost of Services Each firm shall submit in their price proposal and any pricing conditions or contingencies must be clearly stated. 6. References Each Proposer must submit a list of three (3) references of Current and Past Customers of which they have provided services similar in scope and size of those described herein.  Each Reference must be supplied on Clients Letterhead  Each Reference letter must be signed with contact person and phone number. The City retains the right to request any additional information pertaining to the Proposer's ability, qualifications, and procedures used to accomplish all work under the contract as it deems necessary to ensure safe and satisfactory work. 7. Contract Forms All completed contract forms END OF SECTION City of Sunny Isles Beach |Request for Proposal No. 14-11-01 21 DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR PROPOSAL SECTION 6 BID SUBMITTAL FORMS OPENING: 2:30 PM 12/16/2014 PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CITY OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be less all taxes. Tax Exemption Certificate furnished upon request. Issued By: Purchasing Agent Date Issued: This Bid Submittal Consists of Andrew J. Rozwadowski 11/4/2014 Pages 21 through 26 Sealed bids are subject to the Terms and Conditions of this Request for Proposal and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFP 14-11-01 NE 174th Street Roadway Improvements A Bid Deposit in the amount of 5% of the total amount of the bid shall accompany all bids A Performance and Payment Bond in the amount of 100% of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach Procurement Agent: Firm Name: Andrew Rozwadowski ________________________________________ Commodity Code(s): RETURN ONE ORIGINAL, FOUR COPIES AND ONE PDF OF BID SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGES 38-39 OF SECTION 7 BID SUBMITTAL WILL RENDER YOUR BID NON-RESPONSIVE City of Sunny Isles Beach |Request for Proposal No. 14-11-01 22 BID PROPOSAL FORM CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL The lump sum (LS) prices for items 1 through 10 shall be done in accordance with the contract documents and specifications and all applicable federal, state, and local requirements. Costs for pre-construction video survey are to be incorporated into item 1. 1 Mobilization and Demobilization (5%) 1 LS 2 Maintenance of Traffic Including Construction Sequencing 1 LS SUBTOTAL ITEMS 1-2 $_____________ The lump sum (LS) price for (phased) clearing & stripping shall include but not be limited to temporary storage, removal and proper disposal of existing ground coverings, bus shelters, asphalt pavement, sidewalks, curb & gutter, concrete pavement, limerock and subgrade (where applicable), and/or all other organic material from right of way to right of way as necessary to perform the work stipulated in these contract documents. The lump sum price shall also include but not be limited to removal, protection, storage of existing signs, decorative stone, landscaping, and sprinkler systems existing within the work zone. All items shall be restored to as existing (suc h as existing pavers) or better condition and as per plans. 3 Clearing and Stripping 1 LS City of Sunny Isles Beach |Request for Proposal No. 14-11-01 23 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 4 NBR- North Bay Road South of NE 174th Street Clearing and Stripping 1 LS 5 Laboratory Testing 1 LS 6 Survey Stakeout & As-builts 1 LS 7 Stormwater Pollution Prevention Plan (Required) & NPDES Permitting & Monitoring where applicable 1 LS SUBTOTAL ITEMS 3 - 7 $_____________ LANDSCAPE AND IRRIGATION ITEMS 8 – 9 The price for each item shall include but not be limited to all labor, equipment and materials necessary to install and construct these items in accordance with these contract documents. All landscaping unit prices shall include soil amendments needed i.e. mulch, soil, fertilizer and installation. 8 AFI – Annual Flower. 12” SPR Pots 12” O.A, 12” O.C. Selection by LA at time of Planting 1,950 EACH City of Sunny Isles Beach |Request for Proposal No. 14-11-01 24 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 9 BK14 – Bismarkia Nobilis Silver. Specimen 14’ – 16’ CT Matched 64 EACH 10 CN3 – Codiaeum “Norma” Croton Norma. 24” HT, 12” wide, 18” OC, 3 gal. 24” O.C 2,831 EACH 11 FM3 – Ficus Microcarpia Green Island Ficus. 18” SPR. 3 gal. Full pot, 24” O.C 3,905 EACH 12 IV3-Ilex Vomitoria Schellings Dwarf. 12” HT, 12-18” SPR., 24” O.C 315 EACH 13 PD37 – Phoenix Roebelinii Pygmy Date Palm, Triple. 6’ OA. Min Double, 5’ & 3’ CT, field grown 6 EACH 14 PHD14 – Phoenix Dactylifera Medjool Date Palm. 28’ O.A. Min matched specimen palms 13 EACH 15 Hunter DUAL-1 decoders and DUAL-S: Locate at each valve. Installed per spec. 13 EACH 16 Hunter IC-600-pl Dual 48M, DUAL-1: Decoders and DUAL-S with 2-wire decoder controller with 48 station capacity, plastic pedestal, ACC-PED. locate at each valve, installed per spec. 1 EACH City of Sunny Isles Beach |Request for Proposal No. 14-11-01 25 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 17 Hunter Solar-Sync SEN: Solar, rain freeze sensor with outdoor interface. Connects to Hunter PCC, Pro- C, and I-Core Controllers, install as per manufacturer’s instructions. Wired and installed per spec. 1 EA 18 Irrigation Lateral Line: PVC Class 160 SDR 26PVC Class 315 for 1/2" pipe, PVC Class 200 for 3/4" pipe, PVC Class 160 SDR 26 for 1" and above. Installed per spec. 6,500 LF 19 Irrigation Mainline: 2 1/2" PVC Class 200 SDR 2 PVC Class 200 irrigation pipe. Installed per spec. 1,800 LF 20 Irrigation Pipe Sleeve: HDPE PE4710 DR 11 (202psi). Installed per spec. 560 LF 21 Nibco T-113-K Class 125 bronze gate Valve: Includes shut off valve with cross handle, same size as mainline pipe diameter at valve location. Size Range - 1/4" - 3" and installed per spec. 1 EACH 22 Rain Bird 1806-SAM-PRS 5 Series MPR Stream Bubbler: Place on riser with pressure regulation nozzle for spacing as shown on plans, and installed per spec. 551 EACH City of Sunny Isles Beach |Request for Proposal No. 14-11-01 26 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 23 Rain Bird PGA-PRS-D- Globe Electric Remote Control Valve, Globe. With Pressure Regulator Module: Electric w/ 24V Solenoid - 2" Installed per spec. EACH 13 24 RAINBIRD 1806-SAM-PRS SERIES: Flat Trajectory Nozzles 12" commercial pop-up on riser nozzle as shown on plans and installed per spec. EACH 314 25 Reconnect proposed irrigation system to two (2) existing 2" City Water Meter and meter enclosure per plan specifications. LS 1 SUBTOTAL LANDSCAPE AND IRRIGATION ITEMS 8 - 25 $_____________ ROADWORK ITEMS 26 – 51 The price for each road work item shall include but not be limited to all labor, equipment and materials necessary to install and construct these items in accordance with these contract documents. 26 Striping (Thermoplastic) 1 LS 27 NBR - Striping (Thermoplastic) 1 LS 28 Striping (Green Colored Pavement - Per MUTCD) 1 LS City of Sunny Isles Beach |Request for Proposal No. 14-11-01 27 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 29 1" Milling of Existing Road for NE 174th Street West of North Bay Road 5,209 SY 30 NBR - 1" Milling of Existing North Bay Road South of NE 174th Street 1,056 SY 31 1" SP-9.5 Asphalt Overlay in Milled Road Section West of N. Bay Road 5,209 SY 32 NBR - 1" SP-9.5 Asphalt Overlay in Milled North Bay Road Section South of NE 174th Street 1,056 SY 33 3" Type SP-9.5 Asphalt (2 Equal Lifts) for Reconstructed Road East of N. Bay Road 9,243 SY 34 12" Limerock Base Course for Road Reconstruction (98% Compacted) 10,186 SY 35 12" Subbase Course for Road Reconstruction (95% Compacted) 13,257 SY 36 Tencate Mirafi RS380i (15' x 300' Roll) 23,357 SY City of Sunny Isles Beach |Request for Proposal No. 14-11-01 28 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 37 FDOT F-Curb 3,476 LF 38 NBR - FDOT F-Curb 250 LF 39 NBR - FDOT D-Curb 52 LF 40 Modified FDOT F-Curb 3,213 LF 41 2' Valley Gutter 396 LF 42 5' Wide x 6" Thick Concrete Sidewalk (3000 psi) including H/C Sidewalk Ramp as Per Plans 1,948 SY 43 NBR - 5' Wide x 6" Thick Concrete Sidewalk (3000 psi) including H/C Sidewalk Ramp as Per Plans within North Bay Road South of NE 174th Street 139 SY 44 Detectable Warning Surfaces 32 EA City of Sunny Isles Beach |Request for Proposal No. 14-11-01 29 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 45 NBR - Detectable Warning Surfaces within North Bay Road south of NE 174th Street 1 EA 46 Furnish and Install Paveway STS® System (Intersection & Crosswalk) Ruby - Diagonal Herringbone w/Soldier Course Border 1 LS 47 Install 3" Speed Humps 12' Long (widths vary) with Paveway STS® System (Intersection & Crosswalk) Ruby - Diagonal Herringbone w/Soldier Course Border 9 EA 48 Reinstall/Relocate Existing Signs 1 LS 49 NBR - Reinstall/Relocate Existing Signs 1 LS 50 Install New Speed Hump Signs (W17-1); Poles to Match Existing Poles 1 EA 51 Reinstall Existing Bollards 1 LS City of Sunny Isles Beach |Request for Proposal No. 14-11-01 30 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL SUBTOTAL ROADWORK ITEMS 26 - 51 $_____________ STORMWATER STRUCTURES ITEMS 52 – 61 The price for each drainage structure construction item shall include but not be limited to all labor, equipment and materials necessary to install and construct these items in accordance with these contract documents which include all saw cutting, asphalt removal and disposal, excavation, de -watering where applicable, de-watering & NPDES permits, including the required construction of best management practices to maintain turbidity within the required NPDES standards during the duration of the project, bedding material, backfill base material, sodding, curbing, sidewalk, backfill limerock base material, compaction, material to be restored to same elevation as exis ting asphalt pavement (grade to slope) grading, testing, inspections and any other miscellaneous work. 52 Curb Inlet Type 5 w/Round Bottom & USF 5160-5310 4 EA 53 Curb Inlet Type 6 w/Round Bottom & USF 5160-5310 9 EA 54 J7 Manhole w/48" Square Bottom & USF 580 3 EA 55 Type 7 Manhole w/48" Round Bottom & USF 580 8 EA City of Sunny Isles Beach |Request for Proposal No. 14-11-01 31 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 56 Type 7 Manhole w/60" Round Bottom & USF 580 1 EA 57 Type 7 Manhole Top w/USF 580 2 EA 58 FDOT Type C Inlet w/USF 5112-6143 4 EA 59 6' x 6' Manhole Control Structure W/USF 580 (2) & Concrete Weir 1 EA 60 NBR - Modified Type E Inlet w/USF 6608 1 EA 61 6' Diameter Downstream Defender 1 EA SUBTOTAL STORMWATER STRUCTURES ITEMS 52 - 61 $_____________ STORMWATER PIPES 62 – 67 City of Sunny Isles Beach |Request for Proposal No. 14-11-01 32 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL The price for each drainage pipe construction item shall include but not be limited to all labor, equipment and materials necessary to install and construct these items in accordance with these contract documents which include all saw cutting, asphalt removal and disposal, excavation, de-watering where possible, de-watering & NPDES permits, including the required construction of best management practices to maintain turbidity within the required NPDES standards during the duration of the project, bedding material, backfill base material, sodding, curbing, sidewalk, backfill limerock base material, compaction, material to be restored to same elevation as existing asphalt pavement (grade to slope) grading, testing, inspections and any other miscellaneous work. 62 15" A2000 PVC 406 LF 63 18" A2000 PVC 380 LF 64 24" A2000 PVC 696 LF 65 30" A2000 PVC 383 LF 66 36" A2000 PVC 534 LF 67 36" Checkmate Valve w/316 SS Clamp 1 EA City of Sunny Isles Beach |Request for Proposal No. 14-11-01 33 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL SUBTOTAL STORMWATER PIPES ITEMS 62 - 67 $_____________ UTILITIES 68 – 73 The price for each construction item shall include but not be limited to all labor, equipment and materials necessary to install and construct these items in accordance with these contract documents which include all saw cutting, asphalt removal and disposal, excavation, de-watering where possible, de-watering & NPDES permits, including the required construction of best management practices to maintain turbidity within the required NPDES standards during the duration of the project, bedding material, backfill base material, sodding, curbing, sidewalk, backfill limerock base material, compaction, material to be restored to same elevation as existing asphalt pavement (grade to slope) grading, testing, inspections and any other miscellaneous work. 68 6" DIP WM Deflection (incl. Bends, fittings, pipe) 1 EA 69 Modification of Existing Sanitary Manhole Per MDC-WASD Standards 1 EA 70 Adjustment of Covers for Existing Utilities (where necessary) 1 LS 71 Deflection of Existing BCTV & Coordinate w/Utility 4 EA City of Sunny Isles Beach |Request for Proposal No. 14-11-01 34 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 72 Deflection of Existing Buried Telephone, FOC & Coordination w/Utility 1 EA 73 Deflection of Existing Buried Electric 3 EA SUBTOTAL ROADWORK ITEMS 68 - 73 $_____________ MISCELLANEOUS ITEMS 74 - 85 74 Installation of Bus Shelters (Contractor to coordinate with Manufacturer for necessary Engineered documents) w/necessary concrete work to meet dimension requirements and product specifications with reinstallation of existing benches. Include Coordination with Miami-Dade County Transit for all work involving Shelters and routes. 3 EA 75 Removal/Disposal of Existing Drainage Structure or Top 4 EA City of Sunny Isles Beach |Request for Proposal No. 14-11-01 35 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 76 Removal/Disposal of Existing Storm Pipe 529 LF 77 Installation of Traffic Signal Loop (to be coordinated w/MDC-Traffic Engineering w/MDC-Approved Contractor) 1 LS 78 Relocation of Existing Landscape Light Pole (including electric) 2 EA 79 Installation of New Light Pole (including electric) 2 EA 80 Core & Install Proposed Pipe to Existing Seawall 1 LS 81 Connect Existing Drainage to Proposed Drainage 2 EA 82 Remove Existing Parking Meters; Electric, Irrigation, & Sod to be included within North Bay Road South of NE 174th Street 1 LS 83 Reinstall Existing Parking Meters; Electric, Irrigation, & Sod to be included within North Bay Road South of NE 174th Street 1 LS City of Sunny Isles Beach |Request for Proposal No. 14-11-01 36 CITY OF SUNNY ISLES BEACH NE 174TH STREET ROADWAY IMPROVEMENTS CSIB RFP NO. 14-11-01 CAS PROJECT NO. 14-1758 BIDDER AGREES TO PERFORM ALL THE WORK DESCRIBED IN THE CONTRACT DOCUMENTS TO PROVIDE A COMPLETE PROJECT AS SHOWN ON THE PLANS AND SPECIFICATIONS FOR THE FOLLOWING LUMP SUM AND/OR UNIT PRICES. ITEM NO DESCRIPTION QUANTITY UNIT UNIT COST TOTAL 84 Desilting of Existing Drainage 1 LS 85 NBR - Remove and Replace Existing Conc. Post & Reinstall Guardrail 1 LS 86 Furnish & Install Manatee Grate 1 LS SUBTOTAL MISCELLANEOUS ITEMS 74 - 86 $_____________ BID SUBTOTAL (ITEMS 1 - 86) $_____________ 87 Project Contingency To be used at the sole discretion and direction of the Owner. 1 LS 10% 88 Permit Allowance 1 LS $15,000.00 BID TOTAL (1 – 88) NOTE: The Quantities shown in this Bid Form are estimates only. They are generally representative of the work that will be required by the Contractor. The Contractor shall be responsible for verifying all quantities prior to bid. The Contractor shall ensure that ALL work for the proposed right-of-way improvements is completed for the TOTAL price submitted on this Bid Form. The Bidder, by signing this Bid Form and Contract fully acknowledges that he/she will receive no additional compensation (no overhead, no anticipated profits etc.), other than the bid unit price of these items times the number of City of Sunny Isles Beach |Request for Proposal No. 14-11-01 37 items authorized, ordered, installed and accepted by the City; unless it can be proven and agreed to in writing by the City that additional work is required (prior to commencement of additional work). SECTION 7 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: City of Sunny Isles Beach |Request for Proposal No. 14-11-01 38 AUTHORIZED SIGNATURE: DATE: TITLE OF OFFICER: City of Sunny Isles Beach |Request for Proposal No. 14-11-01 39 BID SUBMITTAL FORM Bid Title: NE 174th Street Roadway Improvements The undersigned Proposer proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposer accepts all of the terms and conditions of the Request for Proposal, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 120 days after the day of Bid opening. The Proposer agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that:  The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Permits, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work.  The Proposer has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions.  The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer.  This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposer to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposer or over the City. The City and the successful Proposer will establish completion times for the Work Item and the successful Proposer agrees that the Work will be completed within the time frames agreed upon and stipulated Notice to Proceed. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 40 Firm Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________Fax No. _________________________ Email Address: _______________________________FEIN No. __/__-__/__/__/__/__/__/__ *“By signing this document the bidder agrees to all Terms and Conditions of This Request For Proposal Signature: __________________________________________________________________ (Signature of authorized agent) Print Name: _________________________ Title:_________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 41 ATTACHMENT A (SEE CAS BID PLANS & TECHNICAL SPECIFICATIONS) Notes: 1. Section 00500 (Agreement) referenced in CAS’ specifications will be superseded by Owner issued Agreement. 2. Should a conflict exist between Owner’s RFP front end document and CAS’s Technical Specifications Sections 00700 & 00800, the stricter interpretation will apply. 3. Engineering Plans were created using Autodesk Civil3D 2014. 4. Landscape Architectural plans were created using AutoCad Ver. 10. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 42 ATTACHMENT B (GEOTECHNICAL REPORT) City of Sunny Isles Beach |Request for Proposal No. 14-11-01 43 ATTACHMENT C KNOWN PERMITS TO BE OBTAINED BY CONTRACTOR (WHERE APPLICABLE) ESTIMATED PERMIT FEES NOTES FDEP - NOTICE OF INTENT TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE AND SMALL CONSTRUCTION ACTIVITIES (RULE 62-621.300(4), F.A.C.) $250.00 SFWMD – CONSUMPTIVE USE PERMIT FOR CONSTRUCTION DEWATERING ACTIVITIES $1,000.00 MIAMI-DADE COUNTY CONSTRUCTION DEWATERING PERMIT $300.00 CITY OF SUNNY ISLES BEACH RIGHT-OF-WAY PERMIT N/A CITY OF SUNNY ISLES BEACH LANDSCAPE PERMIT $135.00/hr Hourly Review Fee with a 4hr min per submittal CITY OF SUNNY ISLES BEACH MASTER BUILDING PERMIT The total permit cost is calculated as follows: 2.5% of cost of overall job + 3% of permit fees +7% of permit fees CITY OF SUNNY ISLES BEACH PLUMBING PERMIT The total permit cost is calculated as follows: 2.5% of cost of plumbing job + 3% 0f permit fees +7% of permit fees CITY OF SUNNY ISLES BEACH ELECTRICAL PERMIT The total permit cost is calculated as follows: 2.5% of cost of electrical job + 3% 0f permit fees +7% of permit fees CITY OF SUNNY ISLES BEACH – MOT OFF DUTY POLICE $ ___________ If Off-duty police support is required, the rates are as follows: Police Officer $48/hr; Police Supervisor $52/hr (3 or more officers require a supervisor). Extra duty details on a City observed Holidays shall be billed at $72/hr. There is a 3hr min on all details. City of Sunny Isles Beach |Request for Proposal No. 14-11-01 44 ATTACHMENT D LIST OF MIAMI-DADE COUNTY APPROVED CONTRACTORS LIST (as of 1.28.2014) FOR TRAFFIC SIGNAL MAINTENANCE City of Sunny Isles Beach |Request for Proposal No. 14-11-01 45 AFFIDAVITS