Loading...
HomeMy WebLinkAboutReso 2026-4016RESOLUTION NO. 2026 - A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING A SECOND AMENDMENT TO THE AGREEMENT WITH TEAM CONTRACTING, INC., FOR THE INSTALLATION OF A NEW, PRE- ENGINEERED METAL BUILDING, IN AN AMOUNT NOTTO EXCEED TWO HUNDRED THIRTY-FOUR THOUSAND TEN DOLLARS AND FIFTY-FIVE CENTS ($234,010.55), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE MAYOR TO EXECUTE SAID AMENDMENT; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on September 19, 2024, via Resolution No. 2024-3717, the City Commission of the City of Sunny Isles Beach (the "City") approved an Agreement with TEAM Contracting, Inc. (the "Contractor") to install the roof and walls of a new, pre-engineered metal building (the "Structure") for a workshop and storage for the City's Public Works Department, in an amount not to exceed $290,000.00; and WHEREAS, on May 15, 2025, via Resolution No. 2025-3839, the City Commission approved a First Amendment to the Agreement with the Contractor for the excavation, foundation, and installation of utilities, and installation of soundproofing in the Structure, in an amount not to exceed $160,294.18; and WHEREAS, on -site geotechnical testing identified silty sand, creating an unforeseen structural risk that necessitates the installation of 110 helical piles to ensure building stability, and additional design and engineering services, including structural, fire, mechanical, and electrical work, are required to meet installation and code -compliance requirements ("Additional Services"); and WHEREAS, the Additional Services adds an additional Sixty -Five (65) days for final completion ("Time Extension"); and WHEREAS, the Contractor has provided the City with a proposal for the Additional Services; and WHEREAS, the City Commission wishes to approve a Second Amendment to the Agreement with the Contractor for the Additional Services and Time Extension, in an amount not to exceed Two Hundred Thirty -Four Thousand Ten Dollars and Fifty -Five Cents ($234,010.55), bringing the total contract amount not to exceed Six Hundred Eighty -Four Thousand Three Hundred Four Dollars and Seventy -Three Cents ($684,304.73), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Second Amendment. The City Commission hereby approves a Second Amendment to the Agreement with the Contractor for the Additional Services and Time @BCL@OC188E95 Page 1 of 2 344 Extension, in an amount not to exceed Two Hundred Thirty -Four Thousand Ten Dollars and Fifty - Five Cents ($234,010.55), bringing the total contract amount not to exceed Six Hundred Eighty - Four Thousand Three Hundred Four Dollars and Seventy -Three Cents ($684,304.73), attached hereto as Exhibit "A". Section 2. Authorization of Mayor. The Mayor is hereby authorized to execute said Amendment. Section 3. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 4. Effective Date. This Resolution will become effective upon adoption. 'r . , `Q►TTESTa t Mauric PASSED AND ADOPTED this 161h day Betancur,3 CIVIC, City Clerk Larisa Svechin, Mayor APPROVED AS TO FORM AND LEGAL SUFFICIENCY: Alain E. Boileau, for Nabors, Giblin & Nickerson, P.A., City Attorney 1 Vote: / Mayor Svechin Icy (Yes) (No) Vice Mayor Viscarra (Yes) (No) Commissioner Joseph (Yes) (No) Commissioner Lama (Yes) (No) Commissioner Stuyvesant (Yes) (No) @BCL@OC188E95 Page 2 of 2 345 1Iy Jt' . SECOND AMENDMENT TO THE AGREE, MENT THE CITY OF t\'\ SUNNY ISLES BEACH AND TEAM.CONTRACTING. INC. CONTRACT NC1. THIS SECOND AMENDMENT TO THE AGREEMENT between the CITY OF SUNNY ISLES BEACH (hereinafter "City") and TEAM CONTRACTING, INC., whose Federal Employer Identification (FEI) No. is 65-1002254 (hereinafter "Contractor"), executed this. 6 day of April 2026,. is made a part of the original Agreement between the City and the Contractor, dated September 4, 2024, as amended on September 23, 2025, attached hereto collectively as Exhibit "1 and incorporated herein. The City and Contractor hereby agree as follows.: 1. CONTRACT DOCUMENTS. City and Contractor wish to amend Section 2 of the Agreement, entitled "The Contract Documents," to incorporate Contractor's Proposal, appended hereto as Exhibit "2," into the Agreement,; and to be made: part of the "Contract Documents." 2. TERM. City and Contractor wish to amend Section 4 of the Agreement, entitled "Term to provide additional time to complete the Services, as follows: Subject to the provisions relating to the termination of this Agreement as set forth hereunder, all Services.shall be completed by, and the term of this Agreement shall expire on, July 30, 2026 3. COMPENSATION. City and Contractor wish to amend Section 5 of the Agreement, entitled "Compensation," to provide additional compensation in an amount not to exceed Two Hundred Thirty -Four Thousand Ten Dollars and Fifty -Five Cents ($234,010.55). The additional compensation provided herein will bring the total not -to -exceed Agreement amount to Six Hundred Eighty -Four Thousand Three Hundred Four Dollars and Seventy -Three Cents ($684,304.73), subject to the following revised Payment Schedule: B. Payment. Schedule. Payment to Contractor of the sum set forth herein shall be allocated based upon the following: Execution of Agreement ..$39,295.51 Delivery of Building .............................. ................$157,182.27 Helical Piles, Slab, Building Erected.............. .................. $230,552.74 Engineering, Electrical, Mechanical, and Fire ..................... $103,457.81 Final Completion .............................. ..................$153,816.34 Retainage of five percent (51/6) will be deducted from each payment, to be paid at, final completion, subject to the terms of the Agreement. 4. OTHER PROVISIONS REMAIN IN EFFECT. Except as specifically modified herein, all terms and conditions of the original Agreement shall remain in full force and effect. TEAM CONTRACTING, INC. - SECOND AMENDMENT Page I of 4 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax 5. CONFLICTING PROVISIONS. The terms, statements, requirements, or provisions contained in this Second. Amendment shall prevail and be given superior effect and priority over any conflicting or inconsistent terms, statements, requirements or provisions contained in any other document or attachment, including but not limited to Exhibits "1. IN WITNESS WHEREOF, the parties hereto have executed this document as of the date mentioned above. TEAM CONTRACTING, INC. By: C� Rodo fo Ayan, President STATE OF FLORIDA: COUNTY OF MIAMI-DADS: The foregoing instrument was acknowledged before me by means of Wp"hysical presence or ❑ online notarization, this 20iday of April 2026, by Rodolfo Ayan, President of Team Contracting, Inc. (SEAL) e;;v PersOn4l y• n r' ype vf.Identifi ,ATE 'r1,B E siRim .,,t+'% DANIELGELL �= MY COMMISSION# HH 232226 oPnop`°'� EXPIRES: May 23, 2026 n "or Produced Identification tion.Produced: i 1 : � u Notary Public,. State of Florida (Signature of Notary Public) (Print, Type, or Stamp Commissioned Name of Notary Public) CITY OF SUNNY ISLES BY: to fir, CMC, City Clerk Larisa Svechin, Mayor APPROVED AS TO FORM AND LEGAL SUFFICIENCY BY: BY: izir&- Department Head A ain wE. f"ofleau, for Nabors, Giblin & Nickerson, P.A., City Attorney TEAM CONTRACTING, INC. - SECOND AMENDMENT Page 2 of 4 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax EXHIBIT 1 TEAM CONTRACTING, INC. — SECOND AMENDMENT Page 3 of 4 SUNNY °�.:; �; FIRST AMENDMENT TO THE AGREEMENT BETWEEN THE CITY OF SUNNY ISLES BEACH AND TEAM CONTRACTING INC. CONTRACT NO.2024-6780-2 ft o. SUN N THIS FIRST AMENDMENT TO THE AGREEMENT between the CITY OF SUNNY ISLES BEACH (hereinafter "City") and TEAM CONTRACTING, INC., whose Feder -,- Employer Identification (FEI) No. is 65-1002254 (hereinafter "Contractor"), executed this day of September 2025, is made a part of the original Agreement between the City and the Contractor, dated September 4, 2024, attached hereto as Exhibit "1" and incorporated herein by reference. The City and Contractor hereby agree as follows: 1. SERVICES. City and Contractor wish to amend Section 3 of the Agreement, entitled "Services," to add the following Services and amend the payment schedule: Excavation, foundation, utilities, roof and wall insulation, as well as the installation of gutters and downspouts, as more particularly described in Composite Exhibit 2 to this First Amendment. 2. COMPENSATION. City and Contractor wish to amend Section 5 of the Agreement, entitled "Compensation," to provide additional compensation in an amount not to exceed One Hundred Thirty -Five Thousand Two Hundred Ninety -Four Dollars and Eighteen. Cents ($135,294.18). The additional compensation provided herein will bring the total Agreement not to exceed amount to Four Hundred Twenty -Five Thousand Two Hundred Ninety -Four Dollars and Eighteen Cents ($425,294.18), which includes an amount of Twenty -Eight Thousand Twenty - Nine Dollars and Fifty -Four Cents ($28,029.54) for contingency, if necessary, subject to the following revised Payment Schedule: B. Payment Schedule. Payment to Contractor of the sum set forth herein shall be allocated based upon the following: Execution of Agreement..............................................$39,295.57 Delivery of Building..................................................$157,182.27 Piles, Slab, Building Erected........................................$100,000.00 Final Completion.....................................................$128,816.34 Retainage of five percent (5%) will be deducted from each payment, to be paid at final completion, subject to the terms of the Agreement. 3. OTHER PROVISIONS REMAIN IN EFFECT. Except as specifically modified herein, all terms and conditions of the original Agreement shall remain in full force and effect. 4. CONFLICTING PROVISIONS. The terms, statements, requirements, or provisions contained in this First Amendment shall prevail and be given superior effect and priority over any conflicting or inconsistent terms, statements, requirements or provisions contained in any other document or attachment, including but not limited to Exhibits "1" and "2." IN WITNESS WHEREOF, the parties hereto have executed this document as of the date mentioned above. 1 LAM CUNIRACTING, INC. — FIRST AMENDMENT Page 1 of 4 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33.160 (305) 947-0606 phone (305) 949-3113 Fax TEAM CONTRACTING, INC. r By: R dolfo Ayan, President STATE OF FLORIDA: COUNTY OF MIAMI-DADE: The foregoing instrument was acknowledged before me by means of El"physical presence or ❑ online notarization; this ;n day of September 2025, by Rodolfo Ayan; President of Team Contracting, Inc. `li ELAINEQUESA.DA (SEAL) ;a� "°�� Notary Public -State of Florida ary Public, State of Florida c CoCS HH 353916 (Signature of Notary Public) myy Commission Expire's March 17, 2027 _CCJL)e5 cn (Print; Type or Stamp Commissioned Name of Notary Public) Personally Kogwn or Produced Identification Type of,1 Ifi-4tion Produced: MATTES' CITY OF SU Y ISLE BEACH Y BY: - BY: Mau 'cio Betancu •, CMC, City Clerk L ris Sv, in, Mayor APPROVED AS TO FORM AND LEGAL SUFFICIENCY BY: BY: Department Head lain E. Boileau, for Nabors, Giblin & Nickerson, P.A., City Attorney TEAM CONTRACTING, INC. — FIRST AMENDMENT Page 2 of 4 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax EXHIBIT 1 TEAM CONTRACTING, INC. — FIRST AMENDMENT Page 3 of 4 O` g,NNY ltl se " = AGREEMENT BETWEEN THE CITY OF S _ o BEACH AND TEAM CONTRACTING CONTRACT NO.2024-6780-2 THIS CONTRACTUAL AGREEMENT (hereinafter referred to as the "Agreement') is made in duplicate, this4th day of SAepf ' b. 2024, by and between the CITY OF SUNNY ISLES BEACH, Florida, (hereinafter referred to as "City"), and TEAM CONTRACTING INC., a corporation authorized to do business in the State of Florida (hereinafter referred to as "Contractor") whose Federal I.D. # is 65-1002254. RECITALS WHEREAS, the City of Sunny Isles Beach is in need of a contractor to install a new metal, pre-engineered building, including roof and wall installation, for a workshop and storage for the City's Public Works Department ("Services"); and WHEREAS, Contractor is a certified and insured company with the necessary experience to provide the desired Services; and WHEREAS, Sourcewell is a State of Minnesota local government agency and service cooperative created under the laws of the State of Minnesota (Minnesota Statutes Section 123A.21) that offers cooperative procurement solutions to government entities, which issued Invitation for Bid ("TFB") No. 111821, entitled "Indefinite Delivery -Indefinite Quantity Construction Contracts," and awarded an indefinite quantity construction agreement to Contractor (Contract No. FL-RI0-GC03-1 1,1821-TCl), beginning January 3, 2022 and terminating on December 28, 2-022, with the option to renew for two additional one year terms, both of which are appended hereto as Attachment "A;'.' and WHEREAS, Sourcewell and the Contractor exercised the first and second renewal term, resulting in an extension of the. contract through December 28, 2024; and WHEREAS, the City desires to enter into an agreement with Contractor, using Sourcewell's bid and resulting contract, to provide the .Services, and more particularly, Contractor's proposal, appended hereto and made part hereof as Attachment "B," subject to the terms and conditions contained herein; and WHEREAS, pursuant to the City's procurement code provisions, Section 62-13(I), purchases made through intergovernmental cooperative purchasing arrangements or purchasing consortiums organized as a corporation not for profit whose members are governmental entities, provided that such cooperative purchasing arrangements or consortiums provide for a competitive process to select a vendor are exempt from the City's bidding procedures; and WHEREAS, the City wishes to contract with Contractor to provide the desired Services as more particularly described in Attachment `B" for Two Hundred Sixty -One Thousand Nine Hundred Seventy Dollars and Forty -Six Cents ($261,970.46) plus Twenty -Eight Thousand Twenty Nine Dollars and Fifty -Four Cents ($28,029.54) for contingency, if necessary, resulting in a total not -to -exceed amount of Two Hundred Ninety Thousand Dollars and No Cents ($290,000.00): Team Contracting Inc. 290 .City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax NOW THEREFORE, in consideration of the promises and the mutual covenants set forth herein, the Parties agree as follows: TERMS 1. RECITALS. The Recitals set forth above are hereby incorporated into this Agreement and made a part hereof for reference. 2. THE CONTRACT DOCUMENTS. The Contract Documents consist of this Agreement, as well as the terns and conditions of the Sourcewell IFB No. 111821, and awarded an indefinite quantity construction agreement to Contractor (Contract No. FL-RI0-GC03-111821-TCn, as amended, which are specifically incorporated herein and made a part hereof as Attachment "A," as well as Contractor's proposal to the City, attached as Attachment `B" (hereinafter referred to collectively as,"Contract Documents"). 3. SERVICES. Contractor shall provide the Services pursuant to the terms and conditions set forth in the Contract Documents, including the installation of a new metal, pre-engineered building, including roof and wall installation, for a workshop and storage for the City's Public Works Department. The Services shall be performed by Contractor to the full satisfaction of the City. Contractor agrees to furnish all labor and material in a good and workmanlike and professional manner to perform Services. Contractor agrees to have a qualified representative to audit and inspect the Services provided on a regular basis to ensure all Services are being performed in accordance with the City's needs and pursuant to the terms of this Agreement and shall report to the City accordingly. Contractor agrees to immediately inform the City via telephone and in writing of any problems that could cause damage to the City's property, improvements and persons. Contractor will require its employees to perform their work in a manner befitting the type and scope of work to be performed. In the event that the Contractor fails to complete the Services pursuant to the terms of this Agreement and City must undertake the completion of performance of Services, Contractor agrees to indemnify the City for all costs incurred with respect to the completion of those Services and any damages the City may suffer as a result of the Contractor's failure to perform the Services. 4. TERM. Subject to the provisions relating to the termination of this Agreement as set forth hereunder, the term of this Agreement shall be for a period of ninety (90) days, commencing upon the issuance of a written Notice to Proceed by the City. Payment will be made only for work completed to the satisfaction of the City. Contractor is to commence performance of work from the date specified in the Notice to Proceed and continue in a diligentmanner until completion of the Services. Contractor acknowledges that compliance with the commencement and completion schedule is the essence of this Agreement. The terms of Section 13, entitled "Indemnification and Waiver of Liability," Section 20, entitled "Compliance with Law," Section 8, entitled Warranty of Services, and Section 9, entitled "Defective Work," shall survive termination of this Agreement. 5. COMPENSATION. During the term of this Agreement, in whatever capacity rendered, the City shall pay Contractor for Services performed under this Agreement Two Hundred Sixty - One Thousand Nine Hundred Seventy Dollars and Forty -Six Cents ($261,970.46) plus Twenty - Eight Thousand Twenty -Nine Dollars and Fifty -Four Cents ($28,029.54) for contingency, if necessary, resulting in a total not -to -exceed amount of Two Hundred Ninety Thousand Dollars Team Contracting Inc. 2 291 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax and No Cents ($290,000.00). Payment to Contractor for all charges and tasks under this Agreement shall be in accordance with the Contract Documents and the schedule of charges as reflected in Attachment `$," under the following conditions: , A. Disbursements. There are no reimbursable expenses associated with this contract except for expenses approved by the City Manager. B. Payment Schedule. Payment to Contractor of the sum set forth herein shall be allocated based upon the following: Execution of Agreement(15%)......................................$39,295.57 Deliver of Building(60%).......................................... $157,182.27 Final C.ompletion.(25%)............... ................... :........ .... $65,402.62 Invoices received from the Contractor pursuant to this Agreement will be reviewed by the initiating City Department. Invoices must reference the contract number assigned hereto. Invoices will be paid in accordance with the State of Florida Prompt Payment Act. The City will pay properly submitted Contractor invoices following each monthly period within 30 (thirty) days of receipt, for completed Services and accepted deliveries, unless the City notifies the Contractor in writing of the dispute, before the payment is due. C. Availability of Funds. The City's performance and obligation to pay under this Agreement is contingent upon an annual appropriation for its purpose by the City Commission. If the City should not appropriate or otherwise make available funds sufficient to purchase the Services procured pursuant to this Agreement, the City may unilaterally terminate any and all contractual or other obligations herein without any further liability or penalty upon twenty (20) days' notice to Contractor. D. Final Invoice. In order for both parties herein to close their books and records, the Contractor will clearly state "final invoice" on the Contractor's final/last billing to the City. This certifies that all services have been properly performed and all charges and costs.have been invoiced to the City. Since this account will thereupon be closed, any other additional charges, if not properly included on this final invoice, are waived by the Contractor. Contractor shall make no other charges to the City for supplies, labor, taxes, licenses, permits, overhead, or any other expenses or costs unless any such expense or cost is incurred by Contractor with the prior written approval of the City. If the City disputes any charges on the invoices, it may make payment of the uncontested amounts and withhold payment on the contested amounts until they are resolved by agreement with Contractor. Contractor shall not pledge the City's credit or make it a guarantor of payment or surety for any contract, debt, obligation, judgment, lien, or any form of indebtedness. The Contractor further warrants and represents that it has no obligation or indebtedness that would impair its ability to fulfill the terms of this Agreement. 6. INDEPENDENT CONTRACTOR RELATIONSffiP. The Contractor is an independent Contractor and shall be treated as such for all purposes. Nothing contained in this Agreement or any action of the parties shall be construed to constitute or to render the Contractor Team Contracting Inc. 3 292 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax an employee, partner, agent, shareholder, officer or in any other capacity other than as an independent Contractor other than those obligations which have been or shall have been undertaken by the City. Contractor shall be responsible for any and all of its own expenses in performing its duties as contemplated under this Agreement. The City shall not be responsible for any expense incurred by the Contractor. The City shall have no duty to withhold any Federal income taxes or pay Social Security services and that such obligations shall be that of the Contractor, other than those set forth in this Agreement. Contractor shall furbish its own transportation, office and other supplies as it determines necessary. in carrying out its duties under this Agreement. 7. INSURANCE. Contractor shall, at its sole cost and expense, during the period of any work being performed under this Agreement, procure and maintain the following minimum insurance coverage to protect the City and Contractor against all loss, claims, damage, and liabilities caused by Contractor, its agents or employees, as indicated below: A. Comprehensive General liability insurance, including broad form contractual liability coverage for all operations, including, but not limited to, contractual, products, and completed operations, personal injury and property damage liability with minimum limits of Two Million Dollars ($2,000,000) per occurrence. B. Worker's Compensation and employer's liability coverage, as required pursuant to Florida law. C. Business Automobile Liability which shall include coverage for all owned, non - owned and hired vehicles for minimum limits of not less than One Million Dollars ($1,000,000) per occurrence, One Million Dollars ($1,000,000) per accident for bodily injury and Five Hundred Thousand Dollars ($500,000) per accident for property damage. D. Umbrella/Excess Liability Policy at a minimum of $3,000,000. The Commercial General Liability, Automobile and Umbrella policies must include ,the City bf Sunny Isles Beach as Additional Insured, be based on a Primary /Non -Contributory basis, and include a Waiver of Subrogation on behalf of the City of Sunny Isles Beach. Workers' Compensation must include a Waiver of Subrogation on behalf of the City of Sunny Isles Beach. Insurance required of the Contractor shall be primary to, and not contribute with, any insurance or self-insurance maintained by the City. Such insurance shall not diminish Contractor's indemnification and obligations hereunder. The insurance policy shall be issued by companies authorized to do business under the laws of the State of Florida and acceptable to the City with a minimum A.M. Best rating of A -Excellent. Before any work under this Agreement is performed, and at any time upon request, Contractor shall furnish to the City certificates of insurance evidencing the minimum required coverage and shall be appropriately endorsed for contractual liability, with the City named as additional insured. All policies shall contain a waiver of subrogation endorsement. All policies and certificates shall be in forms and issued by insurance companies acceptable to the City Manager or his designee. All insurance policies and certificates Team Contracting Inc. 293 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax of insurance shall provide that the policies may not be canceled or altered without thirty (30) days prior written notice to the City. Contractor shall also require and ensure that each of its sub- contractors providing services hereunder (if any) procures and maintains, until the completion of the services, insurance of the types and to the. limits specified herein. ANY EXCEPTIONS TO THE INSURANCE REQUIREMENTS IN THIS SECTION MUST BE APPROVED IN WRITING BY THE CITY. 8. WARRANTY OF GOODS & SERVICES. 8.1 The Contractor shall warrant the labor performed for a minimum period of one (1) year from the date the Services are complete. This warranty shall be in addition to whatever rights the City may have. under state or federal law. The Contractor's obligation under this warranty shall be at its own cost and expense, to promptly repair or replace (including cost of removal and installation), that item (or part or component thereof) which proves defective or fails to comply with the Agreement within the warranty period such thatit.complies with the Agreement. 8.2 Contractor warrants to the City that all materials and equipment furnished under` this. Agreement will be new unless otherwise specified and. will be .of good quality, free from faults and defects and in conformance with the Agreement. All equipment and materials not conforming to these requirements, including substitutions not properly approved and authorized; may be considered defective. If required by City or its designee, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by any other provisions within this Agreement. 8.3 Contractor warrants and represents, and this Agreement is entered into by City under the guarantee that a one (1) year manufacturer's warranty for manufacturing defects and a thirty (30) year manufacturer's warranty for the roof and wall sheeting, are being provided. Contractor shall provide to the City or its designee all manufacturers' warranties. All warranties, expressed and/or implied, shall be given to the City for all material and equipment covered by this Agreement. All material and equipment famished shall be fully guaranteed by the Contractor against factory, defects and workmanship. At no expense to the City, the Contractor shall correct any and all apparent and latent defects that are required under state or federal law. 9. DEFECTIVE WORK. 9.1 The City or its designee shall have the authority to reject or disapprove work which is found to be defective. If defective work is found, Contractor shall promptly either correct all defective work or remove such defective work and replace it with non -defective work. Contractor shall bear all direct and indirect costs of such removal or corrections including cost of testing- laboratories and personnel. Team Contracting Ine. 5 294 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax 9.2 Should Contractor fail or refuse to remove or correct any defective work or to make any necessary repairs in accordance with the requirements of this Agreement within the time indicated in writing by the City Manager or its designee, the City shall have the authority to cause the defective work to be removed or corrected, or make such repairs as may be necessary at' Contractor's expense. Any expense incurred by the City in making such removals, corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor. In the event of failure of Contractor to make all necessary repairs promptly and fully, which is not cured in the cure period, the City may declare Contractor in default. 9.3 If, within one (1) year after the date of completion of Services or such longer period of time as may be prescribed by the terms of any applicable special warranty required by the Contract Documents, or by any specific provision(s) of this Agreement, any of the work is found to be defective or not in accordance with this Agreement, Contractor, after receipt of written notice from the City or its designee, shall promptly correct such defective or nonconforming work within the time specified by the City without cost to the City. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under this Agreement including but not limited to any claim regarding latent defects. 9.4 Failure to reject any defective work or material shall not in any way prevent later rejection when such defect is discovered, or obligate the City to final acceptance. 9.5 Where the City or its designee becomes aware of faults, defects, or non -conformity in any of the work provided under this Agreement or with the work being performed by the Contractor, the City or its designee shall issue a Notice to Cure. to the Contractor for correction. In no event shall the failure of the City or its designee to bring to the attention of the Contractor of such faults act as a waiver or release the Contractor from responsibility or liability for such fault, defect or non- conforming work. 10. TERMINATION AND REMEDIES FOR BREACH. A. If, through any cause within reasonable control, the Contractor shall fail to fulfill in a timely manner or otherwise violate any of the covenants, agreements or stipulations material to this Agreement, the City shall have the right to terminate the Services then remaining to be performed. Prior to the exercise of its option to terminate for cause, the City shall notify the Contractor of its violation of the particular terms of the Agreement and grant Contractor ten (10) days to cure such default. If the default remains uncured after ten (10) days the City may terminate this Agreement, and the City shall receive a refund from the Contractor in an amount equal to the actual cost of a third party to cure such failure. If Contractor fails, refuses or is unable to perform any term of this Agreement, City shall pay for services rendered as of the date of termination. . Team Contracting Inc. 6 295 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax 1. In the event of termination; all finished and unfinished documents, data and other work product prepared by Contractor shall be delivered to the City and the City shall compensate the Contractor for all Services satisfactorily performed prior to the date of termination. 2. Notwithstanding the foregoing, the Contractor shall not be relieved of liability to the City for. damages sustained by it by virtue of a breach of the Agreement by Contractor and the City may reasonably withhold payment to Contractor for the purposes of set-off until such time as the exact amount of damages due the City from the Contractor is determined. B. Termination for Convenience of City. The City may, for its convenience and without cause terminate the Services then remaining to be .performed at any time by giving Contractor ten (10) days written notice. The terms of Paragraph 10A(1) and A(2) above shall be applicable hereunder. C. Termination for Insolvency. The City also reserves the right to terminate the remaining Services to be performed in the event the. Contractor is placed either in voluntary or involuntary bankruptcy or makes any assignment for thebenefit of creditors. 11. CONFIDENTIAL INFORMATION. The Contractor shall not, either during the term of this Agreement or any time for a period often (10) years subsequent. to that date upon which this Agreement expires or is terminated, disclose to any person or entity, other than in thedischarge of the duties of the Contractor under this Agreement, any information which the City designates in writing as "confidential." As a violation by the Contractor of the provisions of this Section could cause irreparable injury to the City and there is no adequate remedy at law for such violation, the City shall have the right, in addition to any other remedies available to it at law or in equity, to enjoin the Contractor from violating such provisions. 12. ASSIGNMENTS. TRANSFERS, SUBCONTRACTING The Contractor shall not subcontract, assign, or transfer any work under this Agreement without the prior written consent of the City. Should the Contractor subcontract any services under this Agreement, it shall be done with continued liability for the Contractor. The Contractor shall remain responsible for services, responsibilities, and liabilities of any person or entity acting under Contractor. 13. INDEMNIFICATION AND. WAIVER OF LIABILITY. To the fullest extent permitted by law, the Contractor agrees to indemnify and hold -harmless the City, its agents, representatives, officers, directors, officials and employees from any claims, liabilities, damages, losses and costs, including, but not limited to, reasonable attorney fees to the extent cause, in whole or in part, by the professional negligence, error or omission of the Contractor or persons employed or utilized by the Contractor in performance of Services under this,Agreement. Contractor shall at all times hereafter indemnify, hold harmless and, at the City's option, defend or pay for an attorney selected by the City to defend City, its agents, representatives, officers, directors, officials and employees from and against any and all causes of action, demands, claims, losses, liabilities and expenditures of any kind, including attorney fees, court costs, and expenses, caused or alleged to be caused by the intentional or negligent act of, or omission of Contractor, including those of their employees, agents, servants, or officers, or accruing, resulting from, or directly related to the subject matter of Team Contracting Inc. 7 296 City of Sunny Isles Bench 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax this Agreement including, without limitation, any and all claims, losses, liabilities, expenditures, demands or causes of action of any nature whatsoever resulting from injuries or damages sustained by any person or property. In the event any lawsuit or other proceeding is brought against City by reason of any such claim, cause of action or demand, Contractor shall, upon written notice from City, resist and defend such lawsuit or proceeding by counsel satisfactory to City. The provisions and obligations of this section shall survive the expiration or earlier termination of this Agreement. To the extent considered necessary by City, any sum due Contractor under this Agreement may be retained by City until all of City's claims for indemnification pursuant to this Agreement have been settled or otherwise resolved; and any amount withheld shall not be subject to payment of interest by City. 14. JURISDICTION, VENUE AND WAIVER OF JURY TRIAL. Tl is Agreement shall be interpreted and construed in accordance with and governed by the laws of the State of Florida. All parties agree and accept that jurisdiction of any dispute or controversy arising out of this Agreement, and any action involving the enforcement or interpretation of any rights hereunder shall be brought exclusively in the Eleventh Judicial Circuit in and for Miami Dade County, Florida, and venue for litigation arising out of this Agreement shall be exclusively in such state courts, forsaking any other jurisdiction which either party may claim by virtue of its residency or other jurisdictional device. In, the event it becomes necessary for the City to file a lawsuit to enforce any term or provision under this Agreement and the City is the prevailing party then the City shall be entitled to its costs and attorney's fees at the pretrial, trial and appellate levels. BY ENTERING INTO THIS AGREEMENT, CONTRACTOR AND CITY HEREBY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE TO A TRIAL BY JURY 'OF ANY CIVIL LITIGATION RELATED TO THIS AGREEMENT. Nothing in this Agreement is intended to serve as a waiver of sovereign immunity, or of any other immunity, defense, or privilege enjoyed by the City pursuant to Section 768.28, Florida Statutes. 15. NOTICES. All notices and other communications required or permitted to be given under this Agreement by either party to the other shall be in writing and shall be sent (except as otherwise provided herein) (i) by certified or registered mail, first class postage prepaid, return receipt requested, (ii) by guaranteed overnight delivery by a nationally recognized courier service, or (iii) by facsimile with confirmation receipt (with a copy simultaneously sent by certified or registered mail, first class postage prepaid, return receipt requested or by overnight delivery by traditionally recognized courier service), addressed to such party as follows: If to the City: Stan Morris With a copy to: City Manager City Attorney City of Sunny Isles Beach City of Sunny Isles Beach 18070 Collins Avenue 18070 Collins Avenue Fourth Floor Fourth Floor Sunny Isles Beach, Florida 33160 Sunny Isles Beach, Florida 33160 Tel: (305) 792-1776 Tel: (305) 792-1766 smorris0sibil.net aboileai.t(uhnaniaw.com If to the Rodolfo Ayan, President Contractor: Team Contracting, Inc. 13911 SW 42nd Street, Suite 209 Miami, FL 33175 Team Contracting Inc., 8 297 City of Sunny Isles Bench 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax (305) 207-9799 ext. 206 16. PUBLIC RECORDS. The Contractor shall be required to comply with the following requirements under Florida's Public Records Law: A. Contractor shall keep and maintain public records required by the City to perform the service. B. Upon request from the City, Contractor shall provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided by Chapter 119, Florida Statutes, or as otherwise provided by law. C. Contractor shall ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. D. Contractor shall, upon completion of the contract, transfer, at no cost, to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public records to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided by Contractor to the City, upon request from the City, in a format that is compatible with the information technology systems of the City. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CITY'S CUSTODIAN OF PUBLIC RECORDS AT (305) 792-1703, CityClerk@sibfi.net,18070 Collins Avenue, 4t5 Floor, Sunny Isles Beach, Florida 33160. 17. AUDIT. The Contractor shall make available to the City or its representative all required financial records associated with the Agreement for a period of three (3) years. 18. NON-DISCRIIVIINATION. The Contractor agrees to comply with all local and state civil rights ordinances and with Title VI of the Civil Rights Act of 1984 as amended, Title VIII of the Civil Rights Act of 1968 as amended, Title 1 of the Housing and Community Development Act of 1974 as amended, Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act of 1990, the Age Discrimination Act of 1975, Executive Order 11063, and with Executive Order 11248 as amended by Executive Orders 11375 and 12086. The Contractor will not discriminate against any employee or applicant for employment because of race, color, creed, Team Contracting Inc. 9 298 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax religion, ancestry, national origin, sex, disability or other handicap, age, marital/familial status, or status with regard to public assistance. The Contractor will take affirmative action to insure that all employment practices are free from such discrimination. Such employment practices include but are not limited to the following: hiring, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff, termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the City setting forth the provisions of this non-discrimination clause. The Contractor agrees to comply with any Federal regulations issued pursuant to compliance with Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 708), which prohibits discrimination against .the handicapped in any Federally assisted program. 19. CONFLICT OF INTEREST. The Contractor agrees to adhere to and be governed by the Miami -Dade County Conflict of Interest Ordinance Section 2-11.1, as amended; and by the City of Sunny Isles Beach Ordinance No. 99-82, which are incorporated by reference herein as if fully set forth herein, in connection with the Agreement conditions hereunder. The Contractor covenants that it presently has no interest and shall not acquire any interest, directly or indirectly which should conflict in any manner or degree with the performance of Services under this Agreement. The Contractor further covenants that in the performance of this Agreement, no person having any such interest shall knowingly be employed by the Contractor. The Contractor guarantees that he/she has not offered or given to any member of, delegate to the Congress of the United States, any or part of this contract or to any benefit arising therefrom. 20. COMPLIANCE WITH LAW. Contractor shall comply with all laws, regulations and ordinances of any federal, state, or local governmental authority having jurisdiction with respect to this Agreement ("Applicable Laws") and shall obtain and maintain any and all material permits, licenses, approvals and consents necessary for the lawful conduct of the activities contemplated under this Agreement. 21. CONFLICTING PROVISIONS. The terms and conditions in this Agreement shall supersede and take priority over any inconsistent or conflicting provisions that are,contained in any other document, including but not limited to Attachments "A" and "B". 22. SCRUTMZED COMPANIES. Pursuant to Florida Statutes Section 287.135, and subject to limited exceptions contained therein, a company is ineligible to, and may not, bid on, submit a proposal for, or enter into or renew a contract with an agency or local governmental entity for goods or services if at the time of bidding, submitting a proposal for, or entering into or renewing a contract, the company is on the Scrutinized Companies that Boycott Israel List or is engaged in the boycott of Israel. Contractors must certify that the company is not participating in a boycott of Israel. Any contract for goods or services of One Million Dollars ($1,000,000) or more shall be terminated at the City's option if it is discovered that the company submitted a false certification, or at the time of bidding, submitting a proposal for, or entering into or renewing a contract, is listed on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Terrorism Sectors List, created pursuant to Florida Statute Section 215.473, or is or has been engaged in business operations in Cuba or Syria, after July 1, 2018. Team Contracting Inc. 1 o 299 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 94M606 phone (305) 949-3113 Fax - Any contract entered into or renewed after July 1, 2018 shall be terminated at the City's option if the company is listed on the Scrutinized Companigs that Boycott Israel List or engaged in the boycott of Israel. Contractors must submit the certification that is attached to this agreement as Attachment "C." Submitting a false certification shall be deemed a material breach of contract. The City shall provide notice, in writing, to the Contractor of the City's determination concerning the false certification. The Contractor shall have ninety (90) days following receipt of the notice to respond in writing and demonstrate that the determination was in error. If the Contractor does not demonstrate that the City's determination of false certification was made in error, then the City shall have the right to terminate the contract and seek civil remedies pursuant to Florida Statute Section 287.135. - t 23. E-VERIFY. Florida Statute 448.095 directs all public employers,. including municipal governments, to verify the employment eligibility of all new public employees through the U.S. Department of Homeland Security's E-Verify System, and further provides that a public employer may not enter into a contract unless each party to the contract registers with and uses the E-Verify system. Florida Statute 448.095 further provides that if a Consultant enters into a contract with a subcontractor, the subcontractor must provide the Consultant with an affidavit stating that the subcontractor does not .employ, contract with, or subcontract with an unauthorized alien. In accordance with Florida Statute 448.095, Consultant is required to verify employee eligibility using the E-Verify system for all existing and new employees hired by Consultant during the contract term. Further, Consultant must also require and maintain the statutorily required affidavit of its subcontractors. It is the responsibility of Consultant to ensure compliance with' E-Verify requirements (as applicable). To enroll in E-Verify, employers should visit the E-Verify website (https?/Iwww.e-verify.gov/employers/enrolling-in-e-verify) and follow the instructions. The Consultant must retain the I-9 Forms for inspection, and provide the attached E-Verify Affidavit, attached hereto as Attachment "D." 24. HUMAN TRAFFICKING. Pursuant to Section 787.06, Florida Statutes, entitled "Human Trafficking," a governmental entity cannot execute, renew, or extend a contract with a nongovernmental entity that uses coercion for labor or services, as defined in Section 786.06(2), Florida Statutes. Contractor must submit the affidavit that is attached to this agreement as Attachment "E," signed by an officer or an authorized representative of the Contractor, under penalty of perjury, attesting that Contractor does not use coercion for labor or services as defined in Section 786.06(2), Florida Statutes. Submitting a false certification shall be deemed a material breach of contract. 25. MISCELLANEOUS. A. In the event any provision of this Agreement is found to be void and unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall nevertheless be binding upon the parties with the same effect as though the void or unenforceable provisions had been severed and deleted. B. This Agreement may be executed in multiple identical counterparts, each of which shall be deemed an original for all purposes. Team Contracting Inc. 11 300 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Pax C. This Agreement shall constitute the entire agreement between the parties with respect to the subject matter hereof, and it shall supersede all previous and contemporaneous oral and written negotiations, commitments, agreements and understandings relating hereto. D. Any modification of this Agreement shall be effective only if in writing and signed by the parties to this Agreement. E. No waiver of any provision of this Agreement shall be valid or enforceable unless such waiver is in writing and signed by the party granting such waiver. IN WITNESS WI>EREOF, the parties hereto have executed this Agreement in duplicate on the day and year first written above. TEAM CONTRACTING, INC. 4t - — kodolfo Ayan, President STATE OF FLORIDA: COUNTY OF MIAMI DADE: The foregoing instrument was acknowledged before me by means of Kphysical presence or ❑ online notarization, this V day of,l t ei; 2024, by Rodolfo Ayan, President of Team Contracting, Inc. oc-Tobe- (SEAL) Notary u fc, State ofFlorida (Signature ofNotazy Public) �m a� Ve ELAINE QUE•$ADA � + c:Not airy Public -State of Florida -+ a Commission N HH 353916 My Commission Expireg March 17, 2027 Personally Known v--or Produced Identification _ Type of Identification. Produced: EWne- a �a (Print, Type, or Stamp Commissioned Name of Notary Public) [ADDITIONAL SIGNATURE PAGE TO FOLLOW] Team Contracting Inc.. 12 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax ATTEST: CITY OF S LES BEACH BY: BY: Ma icio Bet cur, Larisa Svec ' , Mayor CMC City Cl rk APPROVED AS TO -FORM AND LEGAL SUFFICIENCY BY: BY: Department Head ain E. Boileau, for Nabors, Giblin & Nickerson, P.A., City Attorney Team Contracting Inc. 13 302 Work Order Signature Document EZIQC Contract No.: FL-R10-GC03-111821-TCI New Work Order ❑ Modify an Existing Work Order Work Order Number.: 183446.00 Work Order Date: 09/10/2024 Work OrderTitle: City of Sunny Isles Beach - Public Works - New metal building Owner Name: Sunny Isles Contractor Name: Team Contracting, Inc. Contact: Rick Labinsky Contact: RudyAyan Phone: 305-968-416.8 Phone: 305-207-9799 Work to be Performed Work to be performed as per the Final Detailed Scope of Work Attached and as per the terms and conditions of F71QC Contract No FL-R1h=GC63-111821-TCI, Brief Work Order Description: Time of Performance Estimated Start Date: Estimated Completion Date: Liquidated Damages Will apply: Will -not armly- Work Order Firm Fixed Price: $261,970.46 Owner Purchase Order Number: Approvals Owner Date Cont ctor Date worK urger signature Document Page 1 of 1 9/10/2024 sour-ceell , Detailed Scope of Work GORDIAN@ To: Rudy Ayan From: Rick Labinsky Team Contracting, Inc. Sunny Isles 13911 SW 42nd St. Suite 209 18070 Collins Ave Miami, FL 83175 Sunny Isles Beach, FL 33160 305-207-9799 305-968-4168 Date Printed: September 10, 2024 Work Order Number: 133446.00 Work Order Title: City of Sunny Isles Beach - Public Works - New metal building Brief Scope: 71 Preliminary Revised 51 Final The following items detail the scope of work as discussed at the site. All requirements necessary to accomplish the Items set forth below shall be considered part of this scope of work. Per attached scope of work. Subject to the terms and conditions of JOC Contract Fl.-R10-GC03-111821-TCI. Contractor Date Owner Date scope of work Page 1 of 1 9/10/2024 Contractor's Price Proposal -'Summary Date: September 10, 2024 Re: IQCMaster Contract #: FL-R10-00O3-111821-TCI Work Order #: 133446.00 Owner PO #: Title: City of Sunny Isles Beach - Public Works - New metal building Contractor: Team Contracting, Inc. Proposal Value: $261,970.46 Design $19,820.97 Doors & Windows $242,149-49 Proposal Total $261,970.46 Thisl total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total Is due to rounding. The Percentage of NPP on this Proposal: % Contractor's Price Proposal - Summary Pagel of 1 9/10/2024 305 Contractor's Price Proposal - Detail Date: September 10, 2024 Re: [PC Master Contract#: FL-R10-GC03.111821-TCI Work Order* 133446.00 Owner PO #: Title: City of Sunny isles Beach - Public Works - New metal building Contractor: Team Contracting, Inc. Proposal Value: $261,970AS Seca item Mod. UOM Description Line Total Labor Equip. Material (Excludes) Design 1 01 22 20 000057 HR Principal Architect $19,820.97 Quantity Unit Price Factor Total Installation 78.00 x 225.00 x 1.1294 19,820.97 Subtotal for Design $79,820.97 Doors & Windows 2 08 12 13 13 0008 EA T x 6'4' Through 7'-2" High, 4-3/4" Deep, 1 B Gauge, Knock Down Hollow $1,685.19 Metal Door Frame Quanntity, Unit Price Factor Total Installation 3:ao x 497.37 x _ 1.1294 1,685.19 3 OB 12 13 130008 0074 MOD For Welded Frames, Add $627 29 Quantity Unit Price Factor Total Installation 3.00 x 185.14 x 1.1294 627.29 4 08 12 13 13 0008 OD75 MOD For Galvanized Frames, Add $161.11 Quantity Unit Price Installation Factor Total 3.00 x 47.55 x 1.1294 161.11 5 08 12 13 130008 0078 MOD For Baked Enamel Finish, Add $454.15 Quantity Unit Price Factor Total Installation 3.00 x 134.04 x 1.1284 454.15 6 08 13 13 13 0090 FA 3' x7' x 1-314', 1e Gauge, Level 3 Extra Heavy Duty, Honeycomb Care, Hollow $3,333.62 Metal Door Quantity Unit Price Factor Total Installation 3.00 x 9B3.89 x 1.1294 3,333.62 7 08 13 13 13 0090 0095 MOD For Galvanized Steel Door, Add $825.60 Quantity Unit Price Factor Total Installation 3.00 x 184.64 x 1.1294 625.60 8 08 13 13 13 0090 0099 MOD I For Baked Enamel Finish, Add $969.26 Quantity Unit Price Factor Total Installation 3.01) x 286.07 x 1.1294 989.26 9 08 13 13 13 0090 01 D3 MOD For 90 Minute Fire Rated Door, Add $316.39 Quantity Unit Price Factor Total Installation 3.0D x 93.38 x -_ 1.1294 316.39 10 08 33 13 00 0065 EA 10' x6', Integral FrameAnd Sill, Aluminum Overhead Rolling Counter Doors $54,477.99 With Galvanized Steel Frame, Stainless Steel Sill, Manual Lift (Overhead Door Company, Series 656) Quantity Unit Price Factor Total Installation 3.00 x 16,078.74 x 1.1294 54,477.99 11 08 33 13 00 0065 .0426 MOD For Motor Operator With Safety Reverse), Add $2,418.56 Quantity Unit Price Factor Total Installation 3.00 x 713.82 x 1.1294 2,418.56 Contractor's Price Proposal - Detail Page 1 of 3 9/1012024 306 Contractor's Price Proposal - Detail Continues - Work Order Number: 133446.00 Work Order Title: City of Sunny Isles Beach - Public Works - New metal building Doors & Windows 12 08 51 13 00 0005 EA >6 To 10 SF, 2-3W Frame Depth, C 35, Tilt In Sash, Single Hung Aluminum $4,205.03 Window (Traco TR-6400) ' Quantity Unit Price Factor Total Installation 6.00 x 723.84 x 1.1294 4,905.03 13 08 71 11 00 0027 PR 4-112" x 4-1/2" Heavy Duty, Full Mortise, Plain Bearing, BrassBronze, Satin $775.53 Chrome Finish Hinge Quantity Unit Pdce Factor Total Installation 6.00 x 114.49 x 1.1294 775.83 14 08 71 11 00 0027 0202 MOD For Pair Of Non -Removable Pins (NRP), Add $40.66 Quantity Unit Pdce Factor Total Installation 6.00 x 8.00 x 1.1294 40.66 15 08 71 11 00 0428 EA 3" Overall Height, Satin Aluminum Finish, Aluminum Floor Stop (Ives $162.36 FS444/448) Quantity Unit Pdce Factor Total Installation 3.00 x 47.92 x 1.1294 162.36 16 08 71 11 00 0563 FA Steel Kick Down Door Holder (Ives FS544) $93.11 Quantity Unit Pdce Factor Total Installation 3.00 x 27.46 x 1.1294 = 93.11: 17 08 71 11 00 0817 EA 12" x 34", 0.050" Thick, Satin Aluminum Finish, Aluminum Kick Plate $574.64 Quantity Unit Pdce Factor Total Installation 6.00 x 84.80 x 1.1294 = 574.64 18 08 71 11 00 2242 FA Surface Mounted Heavy Duty Door Closer (LCN 40101402014110 Series) $1,726.46 Quantity Unit Pdce Factor Total Installation 3.00 x 509.55 x 1.1294 1,726.46 19 08 71 11 00 2242 0249 MOD For Delayed Action, Add $42.69 Quantity Unit Price Factor Total installation 3.00 x 12.60 x 1.1294 4269 20 08 71 11 00 2242 0250 MOD For AVB (5 LB Per Push), Add $22.36 Quantity Unit Price Factor Total Installation 3.00 x 6.60 x 1.1294 22.36 21 OB 71 11 00 2242 0253 MOD For Hold Open Arm, Add $46.76 Quantity Unit Price Factor Total Installation 3.00 x 13.80 x 11294 46.76 22 08 71 11 002273 EA Classroom F42 Pre -Assembled Lockset (Corbin Russwin UT5255)Locked with $7,262.78 key outside. Inside always unlocked. Quantity Unit Price Factor Total Installation 3.00 x 2,143.55 x 1.1204 7,262.78 23 08 72 33 00 0067 LF For Sealing Up To 1-318" Gap, Bottom Mount, Vinyl Tack On Door Sweep $14.20 (Pemko P361V) Quantity Unit Price Factor Total Installation 3.00 x 4.19 x 1.1294 14.20 24 08 72 43 00 0056 LF 5-1/2" Wldth, 1/2" Height, 114' Offset, Aluminum Offset Saddle Threshold $309.92 (Pemko 158A) Quantity Unit Price Factor Total Installation 9.00 x 30.49 x 1.1294 309.92 25 13 34 19 00 0040 GSF 16' Eave Height, >30' To 50' Wide Clear Span Tapered Beam Frame Building $117,340.14 With 26 Gauge Roofing And Siding Quantity Unit Price Factor Total Installation 4,680.00 x 22,20 x 1.1294 117,340.14 Contractor's Price Proposal - Detail Page 2 of 3 9/10/2024 307 Contractor's Price Proposal - Detail Continues.. Work Order Number: 133446.00 Work Order Title: City of Sunny Isles Beach - Public Works - New metal building Doors & Windows 26 13 34 19 OD 004D 0004 MOD For 70' To 99 In Length Only, Add $3,858.48 Quantity Unit Price Factor Total Installation 4,680.00 x 0.73 x 1.1294 3,858.48 27 13 34 19 00 OD40 0010 MOD For 30 PSF Live Load And 30 PSF (110 MPH) Wind Load, Add $28,596.41 Quantity Unit Price Factor Total Installation 6,000.00 x 4.22 x 1.1294 2e,596.41 for 170 mph wind load 28 13 34 19 00 0040 0013 MOD For Each SF Of 24 Gauge Wall Panel, Add $4,114.63 Quantity Unit Price Factor Total Installation 5,280.00 x o.69 x 1.1294 y 4,114.63 29 13 34 19 00 0111 EA Single Door, Metal Frame Rough Opening $1.324.55 Quantity Quantity Unit Price Factor Total Installation x 390.93 x 1.1294 1,324.55 30 13 34 19 00 0115 EA W x 14' Overhead Door, Metal Frame Rough Opening $3,056.05 Quantity Unit Price Factor Total Installation 300 x 901.97 x 1.1294 3,056.05 31 13 34 19 00 0117 EA >12 To 18 SF, Window Opening, Metal Frame Rough Opening $2,813.29 Quantity Unit Price Factor Total Installation 6.00 x 415.16 x 1.1294 2.813.29 Subtotal for Doors & Windows $242,149.49 Proposal Total $261,970.46 This total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding. The Percentage of NPP on this Proposal: % Contractor's Price Proposal - Detail Page 3 of 3 9/10/2024 308 GOPOIANC9 Subcontractor Listing Date: September 10, 2024 Re: IQC Master Contract #: FL-R10-GC03-111821-TCI Work Order M 133446.00 , Owner PO #: Title: City of Sunny Isles Beach - Public Works -New metal building Contractor Team Contracting, Inc. Proposal Value: $261,970.46 Name of Contractor Outies. Amount- /o No Subcontractors have been selected for this Work Order $0.00 0.00 Subcontractor Listing Page 1 of 1 9/1012024 309 TEAM TEAM CONTRACTING General Contractors & Design Builders C'GC 06151 1 • 'CGC 046372 September 3, 2024 RE: City of Sunny Isles Beach Public Works — New Metal Building Public Works Yard Scope of Work Provide new pre-engineered metal building as follows: - Fabricated by DuroBeam 0 36' x 130' by 22' FSW / BSW height 0 170 MPH Wind Load 0 24 gauge wall and roof panels 0 3 hollow metal doors 0 3 overhead doors 0 6 windows o Delivered and installed Design Excludes: - Foundations - Utilities - Permit Fees 'I t305 t 21t'._i)79t 1:91 1 SOL11hWeti1 _I_ ":titre 1, quite `[!S' . \•ii uni. 1 1. ?.'s I' 310 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax COMPOSITE EXHIBIT 2 TEAM CONTRACTING, INC. — FIRST AMENDMENT Page 4 of 4 Contractor Price Proposal. Details'.-, Category Date: 4/30/2025 Work Order #: 133446.00 Title: City of Sunny Isles Beach - Public Works - New Metal Building Excavation/ Foundation/ Utilities Contractor: EZIQC - Team Contracting. Inc. Contractor Number: FL-RIO-GC03-111821-TCI Job Order Value: $397,264.65 Proposal Name: City of Sunny Isles Beach - Public Works - New Metal Building Excavation/ Foundation/ Utilities Proposal Value: $135,294.18 CSI Number- Mod UOM Description "LineTotal Allowance for excavation, loading, dumping transport i 1 01 22 16 00-0002 EA Reimbursable FeesReimbursable Fees will be paid to the $8,000.00 contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or proof of payment shall be submitted with the Price Proposal. Qty Unit Price Factor Total Installation 8000 X $1.00 X 1 $8,000.00 Subtotal for Allowance for excavation, loading, dumping, transport: $8,000.00 :Allowance for new fill, compaction, "and grading 2 0122 16 00-0002 EA Reimbursable FeesReimbursable Fees will be paid to the $6,000.00 contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or proof of payment shall be submitted with the Price Proposal. Qty Unit Price Factor Total Installation 6000 X $1.00, X 1 $6,000.00 Subtotal for Allowance for new fill, compaction, and grading: $6,000.00 Allowance for utilities and utilities hook up " 3 0122 16 00-0002 EA Reimbursable FeesReimbursable Fees will be paid to the $30,000.00 contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or proof of payment shall be submitted with the Price Proposal. Qty Unit Price Factor Total Installation 30000 X $1.00 X 1 $30,000.00 Subtotal for Allowance for utilities and utilities hook up: $30,000.00 Contractor Price Proprosal Details - Category 1 of 2 This report was not generated or reviewed by yourAccount Manager of The Gordian Group CS.I Number Mod U..OM Description _ LineTotal Engineering for utilities allowance 4 01 22 20 00-0062 HR Engineer $5,400.00' Qty Unit Price Factor Total Installation 40 X $135.00 X 1 $5,400.00 Subtotal for Engineering for utilities allowance: $5,400.00 No Category Input 5 03 11 13 00-0005 SF Mat Foundation Wood Formwork $4,315.891 Qty Unit Price Factor Total Installation 660 X $5.79 X 1.1294 $4,315.89 6 03 11 13 00-0005 0001 MOD For <1,000, Add $782.67 Qty Unit Price Factor Total Installation 660 X $1.05 X 1.1294. $782.67 7 03 11 13 00-0010 LF >6" To 12" High Slab Edge and Block -Out Wood Formwork $1,785.24 Qty Unit Price Factor Total Installation 330 X $4.79 X 1.1294 $1,785.24 8 03 21 13 00-0087 LF #4, Grade 40, Slab On Grade, Galvanized Steel Reinforcement Bar $2,737.67 Qty Unit Price Factor Total Installation 2400 X $1.01 X 1.1294 $2,737.67 9 03 31 13 00-0005 SF 6" 3,000 PSI Slab On Grade Concrete Slab Assembly $40,963.34 Qty Unit Price Factor Total Installation 4680 X $7.75 X 1.1294 $40,963.34 10 03 31 13 00-0005 0154 MOD For 4,000 PSI Concrete, Add $1,797.10 Qty Unit Price Factor Total Installation 4680 X $0.34 X 1.1294 $1,797.10 11 03 31 13 00-0005 0159 MOD For Up To 500, Add $13,055.41 Qty Unit Price Factor Total Installation 4680 X $2.47 X 1.1294 $13,055.41 12 03 31 13 00-0027 CY Concrete Pump, Place 3,000 PSI Concrete Mat $18,888.54 FoundationExcludes pumping equipment. Qty Unit Price Factor Total Installation 88 X $190.05 X 1.1294 $18,888.54 13 03 31 13 00-0027 0031 MOD For 4,000 PSI Concrete, Add $1,568.33 Qty Unit Price Factor Total Installation 88 X $15.78 X 1.1294 $1,568.33 Subtotal for No Category Input: $85,894.18 Grand Total: $135,294.18 This work order proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding of the line totals and sub -totals. The Percent of NPP on this Proposal: 0.00 Contractor Price Proprosal Details - Category 2 of 2 This report was not generated or reviewed by your Account Manager of The Gordian Group ,owl C O NTRACTI N G Team Contracting Inc. 13911 SW 42"d Street, Suite 209 Miami, FL 33175 Phone 305-207-9799 Fax 305-207-9790 To: Fabricio Volpi 18070 Collins Avenue Sunny Isles Beach, FL P: (305) 792-1930 E: fvolpi@sibfl.net Proposal Proposal # 697 DATE: May 30th, 2025 For: Sunny Isles Beach- Public Works New Metal Building DESCRIPTION AMOUNT We propose to furnish all labor, equipment, and materials to install the above captured project. To include and limited to: Scope Of Work • ADD GUTTERS & DOWNSPOTS $8,462.00 • ADD R19 6" ROOF + R13 4" WALLS INSULATION $14,303.00 TOTAL $22,755.00 1. THE PRICES MAY BE SUBJECT TO CHANGE IF THE PROPOSAL IS NOT ACCEPTED WITHIN 30 DAYS. 2. 33% PAYMENT IS TO BE MADE UPON PROPOSAL ACCEPTANCE AND THE REMAINDER PAYABLE UPON JOB COMPLETION. 3. ESTIMATE DOES NOT INCLUDE ANY SPECIAL PROVISIONS TO CONTRACT. 4. THE PURCHASER AGREES TO PAY ALL COST OF COLLECTIONS INCUDING ATTORNEY'S FEES AND COURT COSTS. IF THE ABOVE PRICES, SPECIFICATIONS, AND CONDITIONS ARE HEREBY ACCEPTED, TEAM CONTRACTING, INC. IS AUTHORIZED TO DO THE WORK AS SPECIFIED. PAYMENT WILL BE MADE AS OUTLINED ABOVE. A MONTHLY SERVICE CHARGE OF 1.5% WILL BE ADDED IF JOB IS NOT PAID IN FULL WITHIN 30 DAYS OF START DATE ACCEPTED BY: SIGNATURE: TITLE: DATE: City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax EXHIBIT 2 TEAM CONTRACTING, INC. — SECOND AMENDMENT Page 4 of Contractor Price Proposal'Details - Catego.ry Date: 4/10/2026 Work Order #: 133446.00 Title: City of Sunny Isles Beach - Public Works - New metal building Contractor: EZIQC - Team Contracting. Inc. Contractor Number: FL-R10-GC03-111821-TCI Job Order Value: $684,304.73 Proposal Name: Copy (Apr 1 2026 2:47PM) of City of Sunny Isles Beach - Public Works - New metal building- CO #3- Building Department Comments (STRUCTURAL, FIRE, ELEC, MECH ONLY) REVA Proposal Value: $234,010.55 CSI Number, .Mod UOM Description`.. TLineTota Electrical' 1 01 22 20 00-0015 HR LaborerFor tasks not included in the Construction Task Catalog® $798.53 and as directed by owner only. Qty Unit Price Factor Total Installation 16 X $44.19 X 1.1294 $798.53 Contractor Notes: TRENCHING FOR NEW SERVICE PANEL. 2 01 22 23 00-0072 WK 25' Engine Powered, Scissor Platform Lift $1,020.46 Qty Unit Price Factor Total Installation 1 X $903.54 X 1.1294 $1,020.46 3 01 71 13 00-0002 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $357.36 A Rollback Flatbed Trucklncludes loading, tie -down of equipment, delivery of equipment, off loading on site, rigging, dismantling, loading for return and transporting away. For equipment such as trenchers, skid -steer loaders (bobcats), industrial warehouse forklifts, sweepers, scissor platform lifts, telescoping and articulating boom man lifts with up to 40' boom lengths, etc. Qty Unit Price Factor Total Installation 1 X $316.42 X 1.1294 $357.36 4 26 05 19 13-0010 EA Dual, Direct Connected, Receptacle With Box $1,447.30 Qty Unit Price Factor Total Installation 6 X $213.58 X 1.1294 $1,447.30 Contractor Notes: (6) GFCI RECEPTACLES. 5 26 05 19 16-0282 MLF #6 AWG, Type THHN-THWN, 600 Volt, Copper, Single Stranded $144.06 Cable, Installed In Conduit Qty Unit Price Factor Total Installation 0.08 X $1,594.39 X 1.1294 $144.06 Contractor Notes: PROVIDE POWER FOR ELECTRICAL SERVICE. 6 26 05 26 00-0100 EA 3/4" Diameter x 10' Long Copper -Clad Ground Rods $503.85 Qty Unit Price Factor Total Installation 4 X $111.53 X 1.1294 $503.85 7 26 05 26 00-0152 EA 3/4" Bronze Ground Rod Clamp $87.46 Qty Unit Price Factor Total Installation 4 X $19.36 X 1.1294 $87.46 Contractor Price Proprosal Details - Category 1 of 6 This report was not generated or reviewed by your Account Manager of The Gordian Group CSI Number Mod UOM ' DescriptionT T LmeTotalj Electrical 8 26 05 29 00-0228 EA 1/2", Conduit Hanger From Flange, Wire Or Rod $2,676.68 Qty Unit Price Factor Total Installation 1000 X $2.37 X 1.1294 $2,676.68 9 26 05 29 00-0240 EA 24" Long Snap On T-Bar Electrical Box Hanger (Caddy 512) $389.91 Qty Unit Price Factor Total Installation 12 X $28.77 X 1.1294 $389.91 10 26 05 29 00-0270 EA 1/2", "J" Type Conduit Hanger (Unistrut J1205) $318.90 Qty Unit Price Factor Total Installation 12 X $23.53 X 1.1294 $318.90 11 26 05 33 13-0004 CLF 1/2" Electrical Metallic Tubing (EMT) Conduit Assembly With 3 #12 $3,740.69 Copper THHN And 1 #12 Copper Insulated Grounding Conductorincludes conduit, set screw connectors, set screw couplings, straps, wire as indicated. Not for use where detail is available. Qty Unit Price Factor Total Installation 5 X $662.42 X 1.1294 $3,740.69 Contractor Notes: PROVIDE POWER FOR (6) GFCI RECEPTACLES. 12 26 05 33 13-0004 CLF 1/2" Electrical Metallic Tubing (EMT) Conduit Assembly With 3 #12 $5,236.96 Copper THHN And 1 #12 Copper Insulated Grounding Conductorincludes conduit, set screw connectors, set screw couplings, straps, wire as indicated. Not for use where detail is available. Qty Unit Price Factor Total Installation 7 X $662.42 X 1.1294 $5,236.96 Contractor Notes: PROVIDE POWER FOR LIGHTING PACKAGE. 13 26 05 33 13-0605 LF 1-1/2" Electrical Metallic Tubing (EMT) Conduit $328.99 Qty Unit Price Factor Total Installation 30 X $9.71 X 1.1294 $328.99 Contractor Notes: PROVIDE POWER FOR ELECTRICAL SERVICE. 14 26 05 33 16-0005 EA 3-1/2" Depth, 4" Square Steel Box $242.60 Qty Unit Price Factor Total Installation 6 X $35.80 X 1.1294 $242.60 Contractor Notes: PROVIDE POWER FOR (6) GFCI RECEPTACLES. 15 26 05 33 16-0005 EA 3-1/2" Depth, 4" Square Steel Box $1,051.25 Qty Unit Price Factor Total Installation 26 X $35.80 X 1.1294 $1,051.25 Contractor Notes: 4'x4" boxes for lighting package. 16 26 24 16 00-0012 EA 225 Ampere Rating, 120/240 Volt, 3 Wire, 1 Phase, Main Lugs, 30 $2,577.79 Circuit Capacity Assembled Panelboard With Twenty -Four 20 Ampere Breakers Qty Unit Price Factor Total Installation 1 X $2,282.44 X 1.1294 $2,577.79 Contractor Notes: NEW SERVICE PANEL. 17 26 28 16 13-0006 EA 1 Pole GFI, 15 To 30 Amperes, 120/240 Volt, Branch Circuit $687.06 Breaker, 10,000 Amperes Interrupting Capacity Qty Unit Price Factor Total Installation 6 X $101.39 X 1.1294 $687.06 Contractor Notes: BREAKERS. Contractor Price Proprosal Details - Category 2 of 6 This report was not generated or reviewed by your Account Manager of The Gordian Group CS-1 Number Mod UOM-'. Description : LineTotal� Electrical 18 26 51 16 00-0221 EA 2 T8 Lamps, 1' x 4', Surface Mounted, Vandal Proof, Wraparound $21,693.29 Fluorescent Fixtures Qty Unit Price Factor Total Installation 60 X $320.13 X 1.1294 $21,693.29 Contractor Notes: EDSUN Wrap Around Lighting. 19 26 52 13 13-0003 EA 3 Max Wattage At 90 Minutes, 3.6 Volt, Polycarbonate Housing, $2,605.98 LED Lamps, Commercial Emergency Light (Lithonia ELM2 LED) Qty Unit Price Factor Total Installation 10 X $230.74 X 1.1294 $2,605.98 Contractor Notes: Emergency Lighting. 20 26 52 13 16-0022 EA Double Face, Edge -Lit LED Exit Sign With Battery Back -Up $1,478.70 (Lithonia EDG-2-R-EL-M6) Qty Unit Price Factor Total Installation 4 X $327.32 X 1.1294 $1,478.70 Contractor Notes: EXIT SIGNS. 21 26 56 18 00-0010 EA 13 Or 14 Watt Fluorescent, Vandal Resistant, Surface Mounted, $745.91 Rectangular Exterior Area Fixture Qty Unit Price Factor Total Installation 3 X $220.15 X 1.1294 $745.91 Contractor Notes: Edsun Lighting Wall Pack Exterior Lighting. Subtotal for Electrical: $48,133.73 Engineer Services 22 01 22 20 00-0060 HR Principal Engineer $4,020.66 Qty Unit Price Factor Total Installation 16 X $222.50 X 1.1294 $4,020.66 Contractor Notes: Mechanical Engineer Services to Address Building Department Comments. 23 01 22 20 00-0060 HR Principal Engineer $11,559.41 Qty Unit Price Factor Total Installation 46 X $222.50 X 1.1294 $11,559.41 Contractor Notes: Electrical Engineer Services to Address Building Department Comments. Subtotal for Engineer Services: $15,580.07 Piles 24 01 22 20 00-0047 HR Senior Surveyor (Party Chief) $4,723.96 Qty Unit Price Factor Total Installation 96 X $43.57 X 1.1294 $4,723.96 Contractor Notes: To Mark Pile Locations 25 03 11 13 00-0004 SF Pile Cap, Pier Or Spread Footings Foundation Wood Formwork $6,232.93 Qty Unit Price Factor Total Installation 1080 X $5.11 X 1.1294 $6,232.93 Contractor Notes: Pile Cap Formwork. 26 03 11 13 00-0006 SF Grade Beams Or Duct Bank Foundation Wood Formwork $5,401.27 Qty Unit Price Factor Total Installation 978 X $4.89 X 1.1294 $5,401.27 Contractor Notes: Grade Beam Formwork. Contractor Price Proprosal Details - Category 3 of 6 This report was not generated or reviewed by your Account Manager of The Gordian Group CSI Number. Mod UQM Description :. unelotal! Piles 27 03 11 13 00-0006 0001 MOD For <1,000, Add $960.96 Qty Unit Price Factor Total Installation 978 X $0.87 X 1.1294 $960.96 28 03 11 13 00-0078 LF 28" Diameter Round Fiber Tube Formwork $77,038.32 Qty Unit Price Factor Total Installation 1998 X $34.14 X 1.1294 $77,038.32 Contractor Notes: HELICAL PILES (110 QTY) at 25" LESS 34 PILES + 14 Sections of 7 LF= 1998 LF 29 03 21 11 00-0006 LF #3, Grade 50, Beams And Girders, Steel Reinforcement Bar $719.43 Qty Unit Price Factor Total Installation 1300 X $0.49 X 1.1294 $719.43 Contractor Notes: Beam Stirrups 30 03 21 11 00-0008 LF #5, Grade 50, Beams And Girders, Steel Reinforcement Bar $2,602.14 Qty Unit Price Factor Total Installation 1800 X $1.28 X 1.1294 $2,602.14 Contractor Notes: Beam #5 Rebar 31 03 31 13 00-0015 CY Concrete Pump, Place 3,000 PSI Concrete Pile CapsExcludes $7,415.41 pumping equipment. Qty Unit Price Factor Total Installation 31 X $211.80 X 1.1294 $7,415.41 Contractor Notes: Pile Caps Concrete 32 03 31 13 00-0015 0034 MOD For 6,000 PSI Concrete, Add $1,734.11 Qty Unit Price Factor Total Installation 31 X $49.53 X 1.1294 $1,734.11 33 03 31 13 00-0015 0041 MOD For >20 To 50, Add $149.15 Qty Unit Price Factor Total Installation 31 X $4.26 X 1.1294 $149.15 34 03 31 13 00-0031 CY Concrete Pump, Place 3,000 PSI Concrete Grade BeamsExcludes $17,016.83 pumping equipment. Qty Unit Price Factor Total Installation 74 X $203.61 X 1.1294 $17,016.83 Contractor Notes: Grade Beam Concrete. 35 03 31 13 00-0031 0034 MOD For 6,000 PSI Concrete, Add $4,139.50 Qty Unit Price Factor Total Installation 74 X $49.53 X 1.1294 $4,139.50 36 03 37 16 00-0010 HR 35 CY/HR, 66 HP Trailer Mounted Concrete Pumpincludes hoses $2,418.72 Qty Unit Price Factor Total Installation 16 X $133.85 X 1.1294 $2,418.72 Contractor Notes: Grade Beam and Pile Cap Concrete Pump. Subtotal for Piles: $130,552.73 Contractor Price Proprosal Details - Category 4 of 6 This report was not generated or reviewed by your Account Manager of The Gordian Group CSI Number' ModUOM' Description , LineTotalI Special Inspector Allowances 37 01 22 16 00-0002 EA Reimbursable Fees Reimbursable Fees will be paid to the $5,000.00 contractor for eligible costs as directed by Owner. Insert the appropriate quantity to adjust the base cost to the actual Reimbursable Fee. If there are multiple Reimbursable Fees, list each one separately and add a comment in the "note" block to identify the Reimbursable Fee (e.g. sidewalk closure, road cut, various permits, extended warranty, expedited shipping costs, etc.). A copy of each receipt, invoice, or proof of payment shall be submitted with the Price Proposal. Qty Unit Price Factor Total Installation 5000 X $1.00 X 1 $5,000.00 Contractor Notes: Pile Installation Special Inspector Allowance. Subtotal for Special Inspector Allowances: $5,000.00 Ventilation' 38 01 22 23 00-0072 WK 25' Engine Powered, Scissor Platform Lift $1,020.46 Qty Unit Price Factor Total Installation 1 X $903.54 X 1.1294 $1,020.46 39 01 71 13 00-0002 EA Equipment Delivery, Pickup, Mobilization And Demobilization Using $357.36 A Rollback Flatbed Trucklncludes loading, tie -down of equipment, delivery of equipment, off loading on site, rigging, dismantling, loading for return and transporting away. For equipment such as trenchers, skid -steer loaders (bobcats), industrial warehouse forklifts, sweepers, scissor platform lifts, telescoping and articulating boom man lifts with up to 40' boom lengths, etc. Qty Unit Price Factor Total Installation 1 X $316.42 X 1.1294 $357.36 40 10000000004 DURO BUILDINGS (METAUSTEEL ANGLES) $2,149.25 NPP Qty Unit Price Factor Total Tasks Installation 1 X $1,903.00 X 1.1294 $2,149.25 Contractor Notes: See proposal as backup. 41 23 05 29 00-1237 EA 1/2" Standard Duty Clevis Pipe Hanger Assemblylncludes hanger, $230.19 rod, nuts, washers and clamp. Qty Unit Price Factor Total Installation 6 X $33.97 X 1.1294 $230.19 42 23 05 48 13-0026 EA 150 To 450 LB Rated Load Open Isolator, Double Spring Type $626.82 Vibration Isolator Qty Unit Price Factor Total Installation 6 X $92.50 X 1.1294 $626.82 43 23 09 23 53-0438 EA Electronic Programmable Two Heating/Two Cooling Heat Pump Or $685.40 Conventional Unit Thermostat (Honeywell TH6220) Qty Unit Price Factor Total Installation 3 X $202.29 X 1.1294 $685.40 44 23 31 13 13-0005 LB Seal Class A, Rectangular Or Square, Galvanized Steel Sheet $10,435.66 Metal Ductwork Qty Unit Price Factor Total Installation 1000 X $9.24 X 1.1294 $10,435.66 45 23 31 13 13-0005 0107 MOD For>500 To 1,000, Add $1,694.10 Qty Unit Price Factor Total Installation 1000 X $1.50 X 1.1294 $1,694.10 Contractor Price Proprosal Details - Category 5 of 6 This report was not generated or reviewed by your Account Manager of The Gordian Group CSI Number " Mod UOM Descriptiorr, LineTotalj Ventilation 46 23 31 13 13-0005 0673 MOD For Elevated Installation >15' To 20', Add $847.05 Qty Unit Price Factor Total Installation 1000 X $0.75 X 1.1294 $847.05 47 23 33 13 16-0254 EA 36" x 36" Louver Type Fire Damper, Steel Construction, UL Listed, $1,582.90 1-1/2 Hour Rated Qty Unit Price Factor Total Installation 3 X $467.18 X 1.1294 $1,582.90 48 23 34 16 00-0064 EA 1/2 HP Centrifugal Fan, 24-1/2" Wheel, 3,055 - 11,380 CFM At 1/8" $11,768.17 Static Pressure Qty Unit Price Factor Total Installation 3 X $3,473.28 X 1.1294 $11,768.17 49 26 05 19 16-0014 MLF #12 AWG, Type THHN-THWN, 600 Volt, Copper, Single Solid $361.12 Cable, Installed In Conduit Qty Unit Price Factor Total Installation 0.57 X $560.96 X 1.1294 $361.12 50 26 05 33 13-0003 CLF 1/2" Electrical Metallic Tubing (EMT) Conduit Assembly With 2 #12 $819.43 Copper THHN And 1 #12 Copper Insulated Grounding Conductorincludes conduit, set screw connectors, set screw couplings, straps, wire as indicated. Not for use where detail is available. Qty Unit Price Factor Total Installation 1.2 X $604.62 X 1.1294 $819.43 51 26 05 33 16-0005 EA 3-1/2" Depth, 4" Square Steel Box $121.30 Qty Unit Price Factor Total Installation 3 X $35.80 X 1.1294 $121.30 52 26 28 16 13-0006 EA 1 Pole GFI, 15 To 30 Amperes, 120/240 Volt, Branch Circuit $343.53 Breaker, 10,000 Amperes Interrupting Capacity Qty Unit Price Factor Total Installation 3 X $101.39 X 1.1294 $343.53 53 26 28 16 16-0005 EA 30 Amperes, 240 Volt Class, 1 Phase, 2 Wire, 2 Blades And $1,701.28 Fuseholders, Heavy Duty Fusible, NEMA 1 Enclosure, Neutral Kit, Safety Switch Qty Unit Price Factor Total Installation 3 X $502.12 X 1.1294 $1,701.28 Contractor Notes: Disconnect Switches. Subtotal for Ventilation: $34,744.02 Grand Total: $234,010.55 This work order proposal total represents the correct total for the proposal. Any discrepancy between line totals, sub -totals and the proposal total is due to rounding of the line totals and sub -totals. The Percent of NPP on this Proposal: 0.92 Contractor Price Proprosal Details - Category 6 of 6 This report was not generated or reviewed by your Account Manager of The Gordian Group C, tya Ty FLO OF S�,e4 r City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947-0606 City Hall (305) 949-3113 Fax MEMORANDUM TO: Honorable Mayor and City Commissioners VIA: Stan Morris, City Manager FROM: Fabricio Volpi, Public Works Director. DATE: April 16, 2026 RE: Approval of a Second Amendment with TEAM Contracting, Inc. for the Installation of the Public Works Storage/Workshop RECOMMENDATION: Staff presents this item for Commission approval. REASONS: This item is presented for the City Commission's consideration. Through Resolution 2024-3717, the City Commission approved an agreement with Team Contracting for the purchase and installation of a pre-engineered metal building for a workshop and storage area for the Public Works Department. Through Resolution 2025-3839, the City Commission approved the first amendment to this agreement with Team Contracting to add the Commission suggested sound proofing, slab, and other minor improvements. At this time, the City wishes to request a final amendment to the current contract with TEAM CONTRACTI NG I NC. in order to finalize the ongoing installation in an additional amount of $234,010.55 bringing the full contract total not -to -exceed amount to $684,304.73. Item Number: 9.1­1 342 This final amendment is necessary. Following the geotechnical testing conducted on -site, silty sand was identified at a depth of approximately 2 feet. This unforeseen soil condition presents a significant structural risk. Based on engineering recommendations, the installation of 110 helical piles is the only viable solution to ensure the stability and integrity of the building. In addition to the piling work, the following items need to be incorporated to meet installation and code compliance requirements: Design and Engineering Services, Structural, Fire, Mechanical and Electrical Work (panel, conduits, exit signs, service outlets). This final amendment also requests an additional 65 calendar days, extending final completion to July 30th, 2026. FUNDING SOURCE: Funds have been appropriated in Account No. 001-5-5393-463000-00000. ATTACHMENTS: Resolution Second Amendment - TEAM Contracting Item Number: 9.H 343