Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BetaJones Group, Inc., The Bid Document (38)
Prepared for: City of Sunny Isles Beach Opening Date: August 14th, 2026- 11 am Luis A. Betalleluz Office (786) 284-8828 801 Brickell Avenue. Suite 800 Email: contact@betajones.com Miami, Florida 33131 REQUEST FOR QUALIFICATIONS: CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) DISCIPLINE: GENERAL CIVIL ENGINEERS RFQ# 26-07-01 THE BETAJONES GROUP, INC. EXPE DITING DEVELOPMENT TABLE OF CONT ENTS TABS PAGES TAB 1 COMPANY INFORMATION…………………………….……………………………..1-9 TAB 2 QUALIFICATIONS………………….…………………………………………………..10-23 TAB 3 STAFFING…………………………………………………..………….………...............24-59 TAB 4 APPROACH / METHODOLOGY………………………..……..……………………....60-64 TAB 5 REFERENCES…………………………..................................................……………..65-67 TAB 6 CONTRACT FORMS……………………………………………………......…………..68-87 TAB 7 NON-CONTINGENT FEES………………………………………………………………...88 TAB 8 EXCEPTIONS…………………………..……………………………………………………89 . TAB 1 COMPANY INFORMATION 801 Brickell Avenue ∙ Suite 800 ∙ Miami, Florida 33131 THE BETAJONES GROUP – COMPANY INFORMATION CITY OF SUNNY ISLES BEACH RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Name of Agency: The BetaJones Group, Inc. Company Locations: The BetaJones Group, Inc., has two offices in South Florida (Miami-Dade) and one office in Central Florida (Orlando). Corporate Headquarters Pinecrest Office Orlando Office 801 Brickel Avenue 7919 S. Dixie Hwy 7380 Sand Lake Rd Suite 800 Suite 16 Suite 500 Miami, Fl 33131 Pinecrest, Fl 33156 Orlando, Fl 32819 1 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 2 of 2 Website: www.betajones.com Type of Company: S Corporation Date Founded: August 21st, 2006. Operational Office: Corporate Headquarters 801 Brickel Avenue. Suite 800. Miami, Fl 33131 Business line: (786) 284-8828 Direct phone: (786) 564-6276 Fax: (866) 312-8730 E-mail:contact@betajones.com Litigations: The BetaJones Group, Inc has never had any Criminal or Civil litigation. Attached are our Licenses and Certifications, including Company Insurance Certificate and No Litigation Statement. 2 The BetaJones Group/RFQ#26-07-01 Melanie S. Griffin, SecretaryRon DeSantis, GovernorSTATE OF FLORIDABOARD OF PROFESSIONAL ENGINEERSTHE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THEPROVISIONS OF CHAPTER 471, FLORIDA STATUTESBETALLELUZ, LUIS ALBERTO JR.Do not alter this document in any form.801 BRICKELL AVENUE, SUITE 800LICENSE NUMBER: PE65892EXPIRATION DATE: FEBRUARY 28, 2027This is your license. It is unlawful for anyone other than the licensee to use this document.MIAMI FL 33131Always verify licenses online at MyFloridaLicense.comDEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION3The BetaJones Group/RFQ#26-07-01 HOME CONTACT US MY ACCOUNT Data Contained In Search Results Is Current As Of 05/01/2026 02:57 PM. Search Results - 1 Records Please see our glossary of terms for an explanation of the license status shown in these search results. For additional information, including any complaints or discipline, click on the name. License Type Name Name Type License Number/ Rank Status/Expires Professional Engineer HEGEMAN, ADRIANA M.Primary 61699 Prof Engineer Current, Active 02/28/2027 Main Address*:2334 RED CHIP LN KATY, TX 77494 Mailing Address*:2334 RED CHIP LN KATY, TX 77494 Back New Search * denotes Main Address - This address is the Primary Address on file. Mailing Address - This is the address where the mail associated with a particular license will be sent (if different from the Main or License Location addresses). License Location Address - This is the address where the place of business is physically located. T H E O F F I C I A L S I T E O F T H E F L O R I D A D E PA R T M E N T O F B U S I N E S S & P R O F E S S I O N A L R E G U L AT I O N ONLINE SERVICES Apply for a License Verify a Licensee View Food & Lodging Inspections File a Complaint Continuing Education Course Search View Application Status Find Exam Information Unlicensed Activity Search AB&T Delinquent Invoice & Activity List Search LICENSEE SEARCH OPTIONS 3:35:54 PM 5/1/2026 2601 Blair Stone Road, Tallahassee FL 32399 :: Email: Customer Contact Center :: Customer Contact Center: 850.487.1395 The State of Florida is an AA/EEO employer. Copyright ©2023 Department of Business and Professional Regulation - State of Florida. Privacy Statement Under Florida law, email addresses are public records. If you do not want your email address released in response to a public-records request, do not send electronic mail to this entity. Instead, contact the office by phone or by traditional mail. If you have any questions, please contact 850.487.1395. *Pursuant to Section 455.275(1), Florida Statutes, effective October 1, 2012, licensees licensed under Chapter 455, F.S. must provide the Department with an email address if they have one. The emails provided may be used for official communication with the licensee. However email addresses are public record. If you do not wish to supply a personal address, please provide the Department with an email address which can be made available to the public. Please see our Chapter 455 page to determine if you are affected by this change. 4 The BetaJones Group/RFQ#26-07-01 State of Florida Department of State I certify from the records of this office that THE BETAJONES GROUP, INC. is a corporation organized under the laws of the State of Florida, filed on August 21, 2006, effective August 21, 2006. The document number of this corporation is P06000108437. I further certify that said corporation has paid all fees due this office through December 31, 2026, that its most recent annual report/uniform business report was filed on January 27, 2026, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Twenty-seventh day of January, 2026 Tracking Number: 4416797912CC To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 5 The BetaJones Group/RFQ#26-07-01 Minority BusinessCertificationThe BetaJones Group, Inc.01/12/202601/12/20286The BetaJones Group/RFQ#26-07-01 7The BetaJones Group/RFQ#26-07-01 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED? (Mandatory in NH) DESCRIPTION OF OPERATIONS below If yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIRED AUTOS ONLY $ $ P.O. Box 661628 Collinsworth Ins & Risk Mgmt Services In Cert ID 18878 **SPECIMEN** The Phoenix Insurance Company 25623 Travelers Ind. Co.25658 Travelers Property Casualty of 25674 Travelers Cas & Surety Co 19038 Beazley America Insurance Comp 16510 04/24/2025 801 Brickell Ave. 03/30/2025 03/30/2026CUP-6Y760854 B Professional Liability N barbra@collinsworthinsurance.com 03/30/2025 03/30/2026BA-5R07490A A C D E X X X Erinn E Collinsworth Miami Springs FL 33266 Miami FL 33131 (786) 930-4795 (786) 284-8828 (786) 930-4794 X X X X X 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 2,000,000 2,000,000 5,000 1,000,000 03/30/2025 03/30/2026660-9K49687A 03/30/2025 03/30/2026UB-A9502872 1,000,000 10,000 1,000,000 2,000,000 2,000,000 **SPECIMEN** BetaJones Group Inc., The Each Claim X (80)ZG 03/30/202603/30/2025C39588250101 Claims Made Basis Policy Aggregate 1,000,000 Page 1 of 1 8 The BetaJones Group/RFQ#26-07-01 9 The BetaJones Group/RFQ#26-07-01 TAB 2 QUALIFICATIONS 801 Brickell Avenue ∙ Suite 800 ∙ Miami, Florida 33131 THE BETAJONES GROUP – QUALIFICATIONS CITY OF SUNNY ISLES BEACH RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) EXECUTIVE SUMMARY The BetaJones Group, an S Corporation founded on August 21, 2006, is a South Florida full-service Site/Civil Engineering Consulting firm made up of professionals that have previously worked with Top Engineering Firms in the nation; and with more than 4 decades of project and design experience, serving as the client’s engineering consultant throughout the development process providing services needed for every phase including: Feasibility Studies, site planning, engineering design, regulatory permitting, and construction oversight. Our services apply for new development, redevelopment, and rehabilitation projects in all types of land use: • Residential • Commercial • Industrial • Municipal The firm has its Headquarters office in the One Brickell Square Tower at 801 Brickell Avenue, Suite 800, Miami, Florida 33131, which allows our professional staff to be close to Miami-Dade County’s regulatory agencies for fast turnaround times and also brings us closer to the Miami-Dade County Service Areas, allowing us to travel to the site faster. An array of Civil Engineering services are offered at The BetaJones Group, Inc. from design and permitting of sites, drainage, roadways, water/sewer systems, and pump stations, to in-depth studies, inspections, and investigations as well as construction observation and contract administration. With professional engineering experience working throughout the entire state Florida, including some related professional specialties applicable to this project: Municipal Park Projects (Project Manager and / or Civil Engineer of Record), Large and Small Parks, Large Drainage Projects in the Miami Beach Area Stormwater / Hydrologic Studies, Modeling and Design, Water and Sewer Systems, Park / Recreational Facilities Planning and Design, ADA Compatibility, Florida Fish and Wildlife, Permit Review, Feasibility Studies, Renovations, Design of Golf Courses, Roadways, Site Development, Redevelopment, and Multiple LEED Certified Projects, Local Luxury Buildings in Sunny Isles Beach, Older Multi-family Redevelopment Improvements in Sunny Isles Beach, as well as numerous master planning and drainage control projects in Miami-Dade County and South Florida Water Management District, Our team of Licensed Professionals and Staff bring solid and proven Engineering Solutions. Types of projects range from the complete development of a site to single phase projects such as permitting and bringing an existing site up to code compliance (i.e., parking issues, utility compliance, setback and buffer issues, stormwater and drainage design, etc.). BetaJones Group professionals have worked on many site plans, multi-family condominiums/apartments, subdivisions, building additions, site rehabilitations, major infrastructure repairs, LEED Certified Projects, Sustainable / Green sites, golf and country clubs, high rises, educational facilities, office buildings, retail centers, lifestyle centers, 10 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 2 of 14 mix-used developments, strip malls/outlets, warehouses, industrial/commercial parks, cemeteries, waterways, national parks, highway systems, and other complex structures. SCHEDULE OF UNDERSTANDING IN PROVIDING THE REQUIRED SERVICES We truly believe we are the most qualified firm and team to work on this project with our detailed knowledge in different categories of Civil Engineering Municipal Solutions depending on the specific situation, location, and geology; and the balance between technical expertise and real-world scenarios by understanding and being able to design and select the most cost efficient and/or long term solutions for the City of Sunny Isles Beach. In the Sections below, we present our proven past experience in working with many municipalities, including some current contracts. Professionals at The BetaJones Group have extensive experience in Municipal solutions. From site or right- of-way renovations to allow surface water runoff to flow uninterrupted: to more complex Master Stormwater Reports, Drainage Planning and Drainage Modeling of entire communities. Having similar experience in setting up Master Stormwater Reports for Complex Systems, whether 9,000 Acre Subdivisions, to Coastal Communities on a Macro-level, to more localized drainage improvements on a Micro-level such us our Bay Road Drainage Renovations and Injection Pump and Well Systems in the City of Miami Beach, The BetaJones Group licensed and professional Engineers understand the real world complexities of Florida’s Geology (past, present, and future) and how to implement the right drainage solution for each case. Sometimes there is more than one solution, in that case we provide the client with multiple solutions and a value-analysis for the client to decide what, when, and how they would like these drainage solutions to be implemented. Having worked with multiple Drainage Modeling Systems: PONDS, Excel UF TREEO Center, Cascade, AdICPR, and more, we know how to select and construct the modeling system, from the NODE, to the BASIN, and connection PIPE Components as well as entering the different storms and other Factors (Flash Floods, lengthier Hurricane Storms, Surges, and Ocean Level Rise) to run a vigorous drainage model through many different situations. Additionally, understanding of Water and Wastewater Systems, from capacity, to demand, to renovation, to system improvements, to life-cycle costs are an integral part of city planning. We at The BetaJones Group, have successfully become one of leading engineering firms in the Miami-Dade County Sanitary Sewer Evaluation Survey/Certification Program. Locating source leaks, infiltration/inflow identification in past project SSES Certification projects like, The Miami Dade County Youth Fairgrounds, St. Thomas University, Grove Isle, Royal Country Residential Community, Mercy Hospital, La Salle High School, Lourdes High School, and many many more where we have applied onsite evaluation knowledge into decision making assistance to our client in determining the best applicable option, whether single-point repairs, to full renovations and replacement, to a full Master Utility Plan for the present and future. Finally, our past experience in Engineering and Permitting with the City of Sunny Isles Beach and understanding of all other overlapping Jurisdictional Agencies in past project such as Avila Condominiums Parking Lot, Drainage, and Sanitary Sewer Renovations, as well as turning the Blue Grass Center into the Armani Sales Center as the Civil Engineer of Record, which required permitting with Miami Dade County DERM, coordination with the City of North Miami Beach Utilities, and other local and state agencies, we are very familiar with the City Infrastructure and look forward to the opportunity to be of service and further assist. 11 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 3 of 14 RELEVANT EXPERIENCE W/ REFERENCE INFORMATION St. Thomas University Sanitary Sewer Capital Improvement Project o Client: St. Thomas University • Adress: 16401 NW 37th Avenue, Miami Gardens, FL 33054 • Phone number: 305-625-6000 o Contact Person: Mr. Christopher Tarrant, Executive Director of Physical Plant (Facilities Manager) • Phone number: 786-778-7952 • Email address: Ctarrant@STU.EDU o Reference Project Description: Served as Project Engineer o Initial Cost: $450,000 o Actual Cost: $450,000 o Detailed Assessment, Engineering Analysis, and Engineering Calculations, Design, Permitting Assistance, Construction Administration, and Final Certification of the evaluation and modernization of an existing 60-year old sanitary sewer system including over 3-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts to future proof and modernize the St. Thomas University Campus Sanitary Sewer Infrastructure. o Civil Engineering Responsibilities included Design of the following systems: Site Improvement / Hardscape, Sanitary Sewer System connections, Permitting of all Civil Engineering components with multiple Jurisdictional Agencies. o Computer Aided Drafting and Design: Provided 100% of the CAD Drafting and Design of all Construction Documents for Civil Components: Site Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage System / stormwater planning, Drainage System/ Stormwater simulation modeling, watermain extension o Construction: Cost Estimating, Inspections, and Project Management: Construction Administration of all Civil Engineering Components, Shop Drawing Review, Contractor RFIs, Inspections, and Asbuilt Reviews. Provided Client Construction Cost Estimates and provided Project Management of the entire project during the Design and Construction Phases for all Civil Engineering Components. o 16401 NW 37th Avenue, Miami Gardens, FL 33054 o Miami-Dade County, Florida o Date of Completion ETA 2026 Wynwood Headquarters Tower o Client: Cymbal DLT Companies. • Address: 3470 N. Miami Avenue, Upper Suite. Miami, FL 33127. o 3470 N. Miami Avenue, Upper Suite. Miami, FL 33127 o Contact Person: Mr. Benjamin Wolf, Project Manager / Associate Development Manager • Phone number: 305-934-1850 • Email address: bwolf@cymbaldlt.com o Reference Project Description: Served as Project Engineer / Civil Engineer of Record on the development of a 40 story Mixed Use Commercial Residential Luxury Building, deemed as the biggest multi-story building in the famous Miami Wynwood District. o Civil Engineering Responsibilities included Design of the following systems: Site Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage System / stormwater planning, Drainage System/ Stormwater simulation modeling, watermain extension. Permitting of all Civil Engineering components with multiple Jurisdictional Agencies. o Computer Aided Drafting and Design: Provided 100% of the CAD Drafting and Design of all 12 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 4 of 14 Construction Documents for Civil Components: Site Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage System / stormwater planning, Drainage System/ Stormwater simulation modeling, watermain extension o Construction: Cost Estimating, Inspections, and Project Management: Construction Administration of all Civil Engineering Components, Shop Drawing Review, Contractor RFIs, Inspections, and Asbuilt Reviews. Provided Client Construction Cost Estimates and provided Project Management of the entire project during the Design and Construction Phases for all Civil Engineering Components. o Initial Cost: $115,000 o Actual Cost: $150,000 (Client provided 3 main Site Plan and Building Design Changes during the project, which required Engineering Redesign Fees) o Date of Completion 2026 Pinecrest Gardens ADA Renovation Park Project – Study of ADA Accessibility throughout the Park’s existing pathways and bringing the pathways to compliance with ADA Code o 11000 Read Rd. Pinecrest, FL 33156 o Pinecrest, Miami-Dade County, Florida. o Client: Village of Pinecrest • Adress: 12645 Pinecrest Pkwy • Phone number: 305-234-2121 o Contact Person: Mr. Ryan Ruiz, Parks Manager • Phone number: 305-669-6916 • Email address: RRuiz@pinecrest-fl.gov o Served as Project Manager/ Engineer of Record/Head Designer. o Initial Cost: $1.2 Million o Actual Cost: Construction $1.2 Million o Design and permitting to design the ADA Compatible Pathways of a 20-Acre Botanical Garden Park o Civil Engineering Responsibilities included Design of the following systems: Paving and Grading ADA Site Improvement / Hardscape, Marking and Signage, Permitting of all Civil Engineering components with multiple Jurisdictional Agencies. o Computer Aided Drafting and Design: Provided 100% of the CAD Drafting and Design of all Construction Documents for Civil Components: Paving and Grading ADA Site Improvement / Hardscape, Marking and Signage o Construction: Cost Estimating, Inspections, and Project Management: Construction Administration of all Civil Engineering Components, Shop Drawing Review, Contractor RFIs, Inspections, and Asbuilt Reviews. Provided Client Construction Cost Estimates and provided Project Management of the entire project during the Design and Construction Phases for all Civil Engineering Components. o Date of Completion: February 2022 Miami Dade County Public Schools ADA Merritt AND South Miami Middle School o Client: Miami Dade County Public Schools • Address: 1450 NE 2nd Ave, Miami, FL 33132 • Phone number: 305 995 1000 o Contact Person: Mr. Keith Martin, AIA, Project Architect, Prime Consultant KMA, Inc. • Phone number: 305-825-0617 • Email address: myarchitect@keithmartinarchitect.com o Served as Project Civil Engineer/ Engineer of Record. o Initial Cost: $54,000 o Actual Cost $54,000 13 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 5 of 14 o Design and Permitting for needed Site infrastructure improvements at both schools including: New Staff Parking Lot, Existing Parking lot restriping and marking, Drainage solutions of new canopies, drainage solutions of problem hallway and central plan area flooding, drainage solutions for new parking lot. o Civil Engineering Responsibilities included Design of the following systems: Site Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage System / stormwater planning, Drainage System/ Stormwater simulation modeling. Permitting of all Civil Engineering components with multiple Jurisdictional Agencies. o Computer Aided Drafting and Design: Provided 100% of the CAD Drafting and Design of all Construction Documents for Civil Components: Site Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage System / stormwater planning, Drainage System/ Stormwater simulation modeling, watermain extension o Construction: Cost Estimating, Inspections, and Project Management: Construction Administration of all Civil Engineering Components, Shop Drawing Review, Contractor RFIs, Inspections, and Asbuilt Reviews. Provided Client Construction Cost Estimates and provided Project Management of the entire project during the Design and Construction Phases for all Civil Engineering Components. o Date of Completion: 2026 Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation o Client: Miami-Dade Parks, Recreation, and Open Spaces • Address: 275 NW 2nd St. Miami, FL 33128 • Phone number: 305-755-7800 o Contact Person: Mr. Rosa Madruga, Project Manager • Phone number: 305-773-4189 • Email address: Jramos@commodoremgt.com o Served as Project Engineer. o Initial Cost: $250,000 o Actual Cost: $250,000 o Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. o 10901 SW 24th St. Miami, FL 33165 o Miami-Dade County, Florida o Date of Completion: December 2025 Current Municipal Projects Include: CURRENTLY UNDER CONTRACT: Miami Dade Public Schools (3-5 Year Contract) o Project Manager and Civil Engineer of Record on Select Public School Improvement/Modernization Projects o CURRENT PHASE: 8 Schools Under at 100% Construction for Site Improvements awaiting release of Contractor to begin Construction Phase ▪ ADA Merritt K-8 ▪ George Washington Carver Middle School ▪ International Studies Academy. ▪ South Miami Heights Middle School ▪ Bent Tree Elementary School ▪ Miami Jackson Senior High School ▪ Hialeah Middle School 14 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 6 of 14 ▪ Riverside Elementary CURRENTLY UNDER CONTRACT: City of Pembroke Park CCNA (5 Year Contract) o Project Civil Engineer/ Engineer of Record. o Project Manager and Civil Engineer of Record on all Municipal Projects o Worked on a Master Parks Plan (Project taken over internally by City) o Broward County, Florida CURRENTLY UNDER CONTRACT: Oakland Park CCNA (3-5 Year Contract) o Project Manager and Civil Engineer of Record on all Municipal Projects. o Broward County, Florida CURRENTLY UNDER CONTRACT: Miami Gardens CCNA (3-5 Year Contract) o Project Civil Engineer/ Engineer of Record. o Project Manager and Civil Engineer of Record on all Municipal Projects in the City of Miami Gardens o Miami-Dade County, Florida CURRENTLY UNDER CONTRACT: City of Marathon Key CCNA (5 Year Contract) o Project Civil Engineer/ Engineer of Record. o Project Manager and Civil Engineer of Record on all Municipal Projects in Marathon o Monroe County, Florida CURRENTLY UNDER CONTRACT: City of Hillsborough Beach CCNA (5 Year Contract) o Project Civil Engineer/ Engineer of Record. o Project Manager and Civil Engineer of Record on all Municipal Projects o Broward County, Florida MUNICIPAL PROJECT EXPERIENCE: Roadway & Drainage, City of Miami Beach: Miami Beach Bay Road Drainage Improvements o Reference Project Description: Served as Project Engineer. Design, stormwater planning, modeling and permitting for the design-build of roadway and major drainage improvements throughout Bay Road within the City of Miami Beach, Florida . Scope of work included: Master Drainage Planning with the ICPR program, adding additional drainage injection wells, modifying an existing pump station, Right of way and roadway improvements. o Miami Beach, Miami-Dade County, Florida Municipal Project, Multiple Cities: Miami-Dade Transit Master Bus Route Improvements o Reference Project Description: Served as Project Engineer. Design and permitting of over 200 bus shelter additions throughout Miami-Dade County's Bus Transit Route. Scope of work included: the modernization of Miami-Dade County's Bus Transit System, including ADA accessibility, bus shelter site selection, drainage improvements, and other Right of Way Improvements, o Cities of Opa-Locka, Doral, Homestead, North Miami, North Miami Beach, Florida City, El Portal, Miami Lakes, Miami Gardens, Surfside, Medley, and Bay Harbor Islands, Miami-Dade County, Florida Roadway & Drainage, Multiple Cities: I-95 & Pembroke Road Pump Station o Reference Project Description: Served as Office and Field Engineer. Design-Build of a 2.5 mile master drainage pipeline, roadway improvement, and pump station project, including the micro-tunneling under I-95, trenching and boring under major arterial roadways. o Hallandale, Pembroke, and Hollywood, Broward County, Florida Municipal Project, Government Facilities: Seminole Tribe - Hollywood Security Access o Design of new security perimeter, including gates, fencing, barriers, and guard houses in the residential area of the reservation. o Hollywood Seminole Indian Reservation, Broward County, Florida 15 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 7 of 14 Municipal Project, Government Facilities: Wynwood Neighborhood Service Center o Government Building site renovation and neighborhood re-development, design, modeling, and permitting of site, accessibility, parking, drainage, community connectivity and utilities for the expansion of Miami’s Design District o Silver LEED Certification – Goal o Miami, Miami-Dade County, Florida Municipal Project: City of Hallandale 7th Street and North Dixie Highway Drainage Improvements. o Civil Engineer of Record in the Design, Permitting and Construction of Roadway Drainage Improvements Serving NW 7th Street serving 2 City Blocks between 2nd Avenue and North Dixie Hwy. o Hallandale Beach, Broward, Florida Disney Resort: Walt Disney World Shades of Green Resort o Civil Engineer of Record in the Hydraulic Study, Design, and Renovations of the Resort’s Entertainment Pool Area, including adjacent recreational facilities, study and modification of existing infrastructure. o Buena Vista, Orange County, Florida Disney Property - Private Projects: Golden Oaks Drainage Improvements o Civil Engineer of Record in drainage improvements in the development of High-End Single- Family Estate in Walth Disney World and Four Seasons Property Park under Renowned Architect – Gary Hancock - Winter Park Design. o Walt Disney World Property, Orange County, Florida Coral Glades High School Amphitheatre - Development of what will be the last Amphitheater within a public school in Broward County. o 2700 Sportsplex Dr. Coral Springs, FL 33065 o Coral Springs, Broward County, Florida. o Client: Broward County Public Schools o Design and Permitting for the Development of an Amphitheatre under Broward County School Jurisdiction, including design of Stormwater Improvements, Water, Sanitary Sewer Improvements, Erosion and Sedimentation Control, Fire Truck and Loading Access Vehicular Simulation, Signage, ADA Accessibility, Roadway and Parking Lot Markings/Striping, Construction Administration and Coordination with Multiple Jurisdictional Agencies. Services included incorporating drainage improvements into the School Master Stormwater Plan permitted through the State’s South Florida Water Management Districts’ Environmental Resources Master Permit. o Civil Engineering Responsibilities included Design of the following systems: Site Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage System / stormwater planning, Drainage System/ Stormwater simulation modeling. Permitting of all Civil Engineering components with multiple Jurisdictional Agencies. o Computer Aided Drafting and Design: Provided 100% of the CAD Drafting and Design of all Construction Documents for Civil Components: Site Improvement / Hardscape, Marking and Signage, Potable Water, Fire Protection connections, Irrigation lateral and meter, Sanitary Sewer System connections, Drainage System / stormwater planning, Drainage System/ Stormwater simulation modeling, watermain extension o Construction: Cost Estimating, Inspections, and Project Management: Construction Administration of all Civil Engineering Components, Shop Drawing Review, Contractor RFIs, Inspections, and Asbuilt Reviews. Provided Client Construction Cost Estimates and provided Project Management of the entire project during the Design and Construction Phases for all Civil Engineering Components. Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation Study o Client: Miami-Dade Parks, Recreation, and Open Spaces 16 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 8 of 14 o Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. Pinecrest Gardens ADA Renovation Park Project o Study of ADA Accessibility throughout the Park’s existing pathways and bringing the pathways to compliance with ADA Code o Design and Permitting to design the ADA Compatible Pathways of a 20-Acre Botanical Garden Park, Pinecrest, Miami-Dade County, Florida o Project Manager/ Engineer of Record/Head Designer. o Client: Village of Pinecrest Educational Facilities: Mc Fatter Technical School Improvements o Site Fire Suppression System Modernization to Old School Buildings o Davie, Broward County, Florida Educational Facilities: Dillard High School Improvements o Site Fire Suppression System Modernization to Old School Buildings o Ft. Lauderdale, Broward, Florida Educational Facilities: Plantation Middle School Improvements o Site Fire Suppression System Modernization to Old School Buildings o Plantation, Broward County, Florida Educational Facilities: Tedder Elementary School Improvements o Site Fire Suppression System Modernization to Old School Buildings o Deerfield Beach, Broward, Florida Educational Facilities: Biscayne Gardens Elementary o School Renovation Project o Design, modeling, and permitting of infrastructure improvements for school. o North Miami, Miami-Dade, Florida Municipal Project, Educational Facilities: SJRCC Performing Arts Center o Design, modeling, and permitting of site, drainage, and utilities St. John River Community College Arts Center o Middleburg, Clay County, Florida Municipal Project, Educational Facilities: Santa Fe Community College – Pond A o Design and Permitting of 20-Acre Master Stormwater Plan. o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Gainesville, Alachua County, Florida Tropical Memorial Park Track and Field Stadium - Development of an Olympic Certified Track & Multi-Purpose Artificial Turf Sports Field (Soccer, Lacrosse, Football). o Design and Permitting to upgrade the Tropical Park Track and Field Sports Stadium to include a USATF and IAAF Certified Olympic Track & Field Events Area and an NCAA Certified Artificial Turf Sports Multi-Purpose NCAA and High School Association Certified Field for Football, Soccer and Lacrosse; with additional site improvements including the Master Stormwater Plan for the Stadium and Stadium Light Renovation. Design of Interconnected Drainage System to Park Master Stormwater Drainage System which includes 3-30 Acre Lakes (2 as conservation wetlands, 1 as a recreational lake) o Project received a National Award for Top Park Projects in the Country in 2015. o Miami-Dade County, Florida North Glade Park – Design of a 5,000 SF Silver LEED Certified Community Building with lighted walkways and Basketball Court o Civil and Structural Design and Permitting of a 4 Acre MDPROS Park Improvement Project in Carol City. Improvements include the modernization of the Park Clubhouse, design of the 17 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 9 of 14 park basketball courts, parking, drainage, and other infrastructure improvements throughout the park. o Silver LEED Certification o Miami-Dade County, Florida Live Like Bella Park Community Center – Design of a Silver LEED Certified 6,000 SF Community Building with Memorial Site o Civil and Structural Design and Permitting of an 8.6 Acre MDPROS Park Improvement Project near Homestead. Improvements include the modernization of the Park Clubhouse, covered loggia, 6,000 SF clubhouse/community building, and site infrastructure improvements throughout the park. o Silver LEED Certification o Miami-Dade County, Florida West (End) Kendall District Regional Park – Design of Infrastructure to serve the Development of Miami-Dade County’s next Regional Park. o Design and Permitting to design the complete site infrastructure of a 155-Acre Regional Park, including the Master Stormwater Plan to serve the entire park buildings, sport fields, running tracks and all other facilities which included a 22 Acre Lake specially designed and coordinated with the State, County and FAA since the site is designed adjacent to Kendall- Tamiami Executive Airport. o Miami-Dade County, Florida Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation Study o Client: Miami-Dade Parks, Recreation, and Open Spaces o Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. o Miami-Dade County, Florida Zoo Miami Florida Exhibit & Park Entrance - Value Analysis Study o Reference Project Description: Served as Project Engineer. Complete Value Engineering Analysis and Design Review of Proposed Renovation of Zoo Miami. o Miami-Dade County, Florida Airport, Opa-Locka: Opa-Locka Aiport MDC Fire Rescue Heliport Station #25 o Reference Project Description: Served as Project Engineer. Design and Permitting of site, paving , grading, and drainage for the development of a Helipad, Associated hangar, and driveway connection within Basin 220 of the Opa-Locka Master Drainage Plan located within the Opa-Locka Airport Property. Scope required an engineering study of the Opa-Locka Airport Drainage Master Plan Basin 220 As-Builts and Calculations to provide site modifications without causing negative impacts on the Airport's Drainage System. o Miami-Dade County, Florida Airport, Miami International: MIA Fumigation Facility o Reference Project Description: Served as Project Engineer. Design and Permitting of site infrastructure, including parking and utility improvements for the development of a chemical storage and fumigation operation facility located within Miami International Airport Property. Scope required permitting with all associated jurisdictions, including but not limited to Miami- Dade County, Miami-Dade Aviation Department, DERM/PERA, MDWASD, FDEP, FDOH, FAA. o Miami-Dade County, Florida Airport, Homestead Airforce Base: Homestead Airforce Base Armory Expansion o Reference Project Description: Served as Project Engineer. Design and Permitting of site infrastructure, including parking and utility improvements for the construction of an armory expansion project located in Homestead Airforce Base. Scope required permitting with all 18 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 10 of 14 associated jurisdictions, including but not limited to Miami-Dade County, DERM/PERA, MDWASD, FDEP, FDOH. o Homestead, Miami-Dade County, Florida Municipal Project, Multiple Cities: Miami-Dade Transit Master Bus Route Improvements o Reference Project Description: Served as Project Engineer. Design and permitting of over 200 bus shelter additions throughout Miami-Dade County's Bus Transit Route. Scope of work included: the modernization of Miami-Dade County's Bus Transit System, including ADA accessibility, bus shelter site selection, drainage improvements, and other Right of Way Improvements, o Cities of Opa-Locka, Doral, Homestead, North Miami, North Miami Beach, Florida City, El Portal, Miami Lakes, Miami Gardens, Surfside, Medley, and Bay Harbor Islands, Miami- Dade County, Florida Airport, Miami International: MIA Westside Fuel Tender Facilities o Reference Project Description: Served as Construction Cost Estimator and office Engineer. Construction of the Westside Fuel Tender Facilities with associated parking, access roads, infrastructure within Miami International Airport Property. o Miami-Dade County, Florida Airport, Miami International: MIA Midfield Phase IIIC o Reference Project Description: Served as Construction Cost Estimator. Construction of the MIA Midfield project including the reconstruction of the airfield runway, underground utilities, demolition of buildings, and removal of miscellaneous items within Miami International Airport Property. o Miami-Dade County, Florida Airport, Kendall-Tamiami Executive Airport: Kendall-Tamiami Airport Hangars o Design and Construction of 2 extra large hangars with driveway, taxiway, reinforced foundation design, with associated parking, utilities, and other infrastructure at Kendall-Tamiami Executive Airport. Served as Project Engineer throughout the Design and Construction of the project. o Silver LEED Certification o Miami-Dade County, Florida Government Facilities: Border Patrol Detainee Center o Design, modeling, and permitting of site, drainage, and utilities for the Department of Homeland Security on a 4.3 acre wetland. Project included major drainage design and permitting with the U.S. Corps of Engineers. o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Dania Beach, Broward County, Florida Municipal Project, Government Facilities: Seminole Tribe - Hollywood Security Access o Design of new security perimeter, including gates, fencing, barriers, and guard houses in the residential area of the reservation. o Hollywood Seminole Indian Reservation, Broward County, Florida National Project, State Park: Rio Fajardo (Fajardo River) Mitigation Plan o Hydraulic Study, Mangrove Restoration, Plan for a 85-Acre site near Punta Fajardo, Puerto Rico. o Designed and permitted for the U.S. Army Corps of Engineers Municipal Project, Government Facilities: Seminole Tribe - Ft. Pierce Security Access o Design of new security perimeter, including gates, fencing, barriers, and guard houses in the residential area of the reservation. o Ft. Pierce, St. Lucie County, Florida Military Facilities: Department of Military Affairs Miramar Military Base Training Facilities o Design and permitting of military training building addition including site, utility, and, drainage improvements. Permitting through the Department of Military Affairs, City of Miramar. 19 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 11 of 14 Miramar, Broward County, Florida Military Facilities: Robert M. Ballad Armory Expansion o Site Improvements, including drainage renovations and utility upgrades of an existing Military Building for the Department of Military Affairs o Miami, Miami-Dade County, Florida Municipal Project, Government Facilities: Wynwood Neighborhood Service Center o Government Building site renovation and neighborhood re-development, design, modeling, and permitting of site, accessibility, parking, drainage, community connectivity and utilities for the expansion of Miami’s Design District o Silver LEED Certification – Goal o Miami, Miami-Dade County, Florida Government Facilities: Border Patrol Detainee Center o Design, modeling, and permitting of site, drainage, and utilities for the Department of Homeland Security on a 4.3 acre wetland. Project included major drainage design and permitting with the U.S. Corps of Engineers. o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Dania Beach, Broward County, Florida Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation o Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. o Miami-Dade County, Florida West (End) Kendall District Regional Park – Design of Infrastructure to serve the Development of Miami-Dade County’s next Regional Park. o Design and Permitting to design the complete site infrastructure of a 155-Acre Regional Park, including the Master Stormwater Plan to serve the entire park buildings, sport fields, running tracks and all other facilities which included a 22 Acre Lake specially designed and coordinated with the State, County and FAA since the site is designed adjacent to Kendall- Tamiami Executive Airport. o Miami-Dade County, Florida Zoo Miami Florida Exhibit & Park Entrance - Value Analysis Study o Reference Project Description: Served as Project Engineer. Complete Value Engineering Analysis and Design Review of Proposed Renovation of Zoo Miami. o Miami-Dade County, Florida State Park: Florida Fish & Wildlife CC - Royce Unit o 2,700 Acre Hydrologic Study and Hydraulic Restoration Project o Highlands County, Florida Private Projects: Winter Park Estates Drainage Improvements o Civil Engineer of Record in drainage improvements in the development of many High-End Estate Homes in Winter Park under Renowned Architect – Gary Hancock - Winter Park Design. o Winter Park, Orange County, Florida Private Projects: Packett Medical Center o Civil Engineer of Record in the Design, Permitting and Construction Administration for the development of a Medical Office Complex with Multiple Buildings adjacent to a Lake. Project Included detailed simulation of an interconnected drainage system and coordination with Environmental Wetland Impact Design. o Lakeland, Florida ADDITIONAL LIST OF COMPLETED PROJECTS AVAILABLE UPON REQUEST 20 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 12 of 14 PROJECT MANAGER EXPERIENCE, TECHNICAL QUALIFICATIONS AND EXPERTISE • Mr. Luis A. Betalleluz, Licensed Professional Engineer is the Project Manager and Lead Civil Engineer of Record on this Project. With over 20 years of professional experience working throughout the entire state Florida, including some of related professional specialties applicable to this project: Municipal Projects and Large-Scale Utility Rehabilitation, Watermain Rehabilitations and Watermain Extensions (Project Manager and / or Civil Engineer of Record), This List make him an expert in Project Management and engineering design for each specific aspect that is needed for this project. • Amongst the Types of Projects Specifically Related to similar geographic and other possible Municipal Projects (Listed in his Resume Section) Scope include: o Broward County School –Major Watermain Rehabilitation and Waterline Upgrade Projects in 4 Public Schools from a Range of 1,000 LF to 10,000LF around the entire school campus in order to provide sufficient Fire Flow and Pressure to all school buildings providing fire protection to old buildings previously without fire sprinkler systems. o Miami Beach Bay Road Drainage Improvements (Including Deep Injection Well System) – Roadway Drainage Project providing drainage improvements to Bay Road which covers approximately 8 City Blocks of Right-of-Way Pressurized drainage system along with a large pump station. o City of Hollywood’s Design-Build I-95 Pump Station Project – This took into account complex drainage modeling and over 2.5 miles of pressurized drainage pipe line improvements and a pump station building. Mr. Betalleluz was heavily involved with the Cost Estimates, Take- Offs, and Construction oversight of this project which provided over 30 square miles of drainage relief in South Brorward and North Dade County o Starwoods Tribute/Element Luxury Hotel in Ft. Lauderdale which required a 1,000 LF 8” watermain extension across a large length of NE 3rd Street up to North Federal Highway, an FDOT Road. o Miami-Dade County Transit Busway Improvements (over 12 Cities including North Miami Beach) o Miami – Dade County Youth Fair SSES Sewer Certification – Study, Rehabilitation and Certification of over 5 miles of gravity and pressurized sanitary sewer system serving this 88 Acre park facility. o Grove Isle Sewer SSES Sewer Certification – Study, Rehabilitation and Certification of over 3 miles of gravity and pressurized sanitary sewer system serving a private island with a residential and hotel complex. • Over 20 Fully LEED Certified Projects including High End Hotels, Government Buildings, and Parks. (See Resume Description for All LEED Certified Projects.) • Additionally, over 50% of projects that Mr. Betalleluz has been involved throughout his career have had Architects, Landscape Architects, Surveyors, MEPs, Structural Engineers and Other Design Professionals, showing a proven track record in coordinating with a Design Team and the Client for successful completions of projects. • Mr. Betalleluz has worked with Florida Fish and Wildlife in a 2,800 Acre Drainage Preservation Study, In Puerto Rico with the USCAE in a Mangrove Habitat Restoration Project, as well as the City of Miami Beach and City of Gainesville, FL in Historic Building Restoration and/or Preservation Projects. • Mr. Betalleluz himself had his collegiate education at the University of Florida Top Engineering School in the State and 35-year Resident throughout the Entire State of Florida and practicing engineering experience throughout the state of Florida in similar or identical projects brings him experience in design and jurisdictional knowledge. 21 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 13 of 14 Some of Mr. Betalleluz’s designs also have won national awards, Project of the Year Nominations, amongst many years of design experience (Tropical Park Track and Field Stadium). SCHEDULES, COST, AND QUALITY The BetaJones Group, Inc. team’s philosophy “level of technical excellence, practical experience and client responsiveness” includes the following 3 key Tasks in every project: a. SCHEDULE CONTROL Large Projects such Everglades Restoration Project, Tropical Memorial Park Track and Field Stadium, West (End) Kendall District Regional Park, Miami-Dade Transit, and All Miami Dade Aviation Airport Projects were successfully completed via a Controlled Schedule done in professional Scheduling Software. An analysis of the Critical Path Method and Tight Contract Control along with Agency Follow Ups allowed for these projects to be finalized within the Project Time Period. b. COST CONTROL Many of our Large Projects such as Tropical Memorial Park Track and Field Stadium, West (End) Kendall District Regional Park, Miami-Dade Transit, and All Miami Dade Aviation Airport Projects were successfully completed on budget by providing Cost Estimates throughout the Design Process, along with Value Engineering and Constant Coordination with the Client. This allowed all of our projects to come be completed within the full Project’s budget and allowed our clients to save thousands of dollars and in some cases, hundreds of thousands of dollars in construction costs. c. QUALITY CONTROL The BetaJones Group does not release any internal design until at least two experienced engineers have reviewed Design and Design Calculations. This allows the quality of our product to always be solid and presentable. LIST OF CLIENTS • Dezer/Trump Development Group • The Related Group • St. Thomas University • University of Miami Doctor’s Hospital • Miami Dade County Parks, Recreation and Open Spaces • City of Hallandale Beach • City of Miami Gardens • City of Marathon Key • Village of Pinecrest • The Seminole Tribe of Florida • The United States Department of Military Affairs • The United States Corps of Engineers • Cymbal Development • Stanbery Development • The Arnold Palmer Design Group • Deering Bay Golf and Country Club • Brown Hill Development 22 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 14 of 14 • Cargo Ventures • Colliers Arnold International • USAA Realty Company • Wachovia Center – Tampa • The Columbus Center • Itasca Construction • Palm Architecture • Various Property Management Firms • Various HOA’s and Condominium Boards 23 The BetaJones Group/RFQ#26-07-01 TAB 3 STAFFING 801 Brickell Avenue. Suite 800. Miami, Florida 33131 THE BETAJONES GROUP STAFFING CITY OF SUNNY ISLES BEACH RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Proposer’s Personnel and Project Team: The BetaJones Group has 2 Full-Time Professional Engineers and over 6 Technical and Support Staff. 1.Mr. Luis A. Betalleluz, P.E. – Principal, Project Manager and Civil Engineer 2.Ms. Adriana Hegeman, P.E. – Assistant Project Manager and Civil Engineer 3.Ms. Michelle Lopez – Office Director and Marketing 4.Ms. Rosina Good – Marketing and Technical Staff 5.Mr. Wayne Dolese – Business Development / Project Coordinator 6.Mr. Eddy Briel – Senior Field Superintendent 7.Mr. Eddy Briel Sr. – Master Plumber 8.Mr. Jose Luis Benitez – Technical Staff Supervisor Subconsultants included in this Project: 1.Bliss & Nyitray, Inc a.Disciplines – Structural Engineering b.Point of Contact –William Caycedo, P.E. Funded in 1955, we have provided a full range of Structural Engineering, value Engineering and Inspection services of recognized high quality to a variety of private and governmental clients throughout the United States and the Caribbean. Our knowledge of materials, foundations and framing systems and our focus on the needs of the project has given our firm a reputation for highly creative designs that reduce cost and simplify construction Location:5835 Waterford District Dr. Suite 400. Miami, FL 33126 Business Line:(305) 442-7086 Direct phone: (305) 351-0236 Fax: N/A E-mail: w-caycedo@bniengineers.com Website: www.BNIengineers.com 2.ProCon Engineering, Inc a.Disciplines – MEP Engineering Consultants b.Point of Contact – Fernando Anzoategui ProCon Engineering Inc. is a Miami based engineering firm founded in 2002 to provide mechanical, 24 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 2 of 2 electrical, plumbing and energy engineering design analysis within an inter -disciplinary framework. Location:7240 SW 39th Terr. Miami, FL 33155 Business line: (305) 351-0236 Direct phone: (786) 269-5852 Fax: 305) 266-7798 E-mail:proconengineers@bellsouth.net Website: ProCon.com 3. Terracon Consultants, Inc a. Disciplines - Geotechnical and Environmental Engineering b. Point of Contact – Hugo Soto Knowledge of and hands-on experience with the most recent technological developments and equipment Is considered a major emphasis of the firm. Computers are used extensively for information management, design, cooling/heating load calculations, duct desig n, water piping design, energy saving calculations and drafting. Location:16200 NW 59th Ave. Suite 106. Miami Lakes, FL 33014 Business line: (305) 820-1997 Direct phone:(786) 266-6619 Fax:N/A E-mail:hugo.soto@terracon.com Website:Terracon.com 4. Longitude Surveyors, LLC a. Disciplines - Surveying and Mapping b. Point of Contact – Eduardo Suarez They are serving South Florida since 2004 and offer Surveying and Mapping, Construction Surveys, Subsurface Utility Engineering (SUE) Services, 3D and Drone Services. Location:7700 N Kendall Dr. Suite 705. Miami, FL 33156 Business line: (305) 463-0912 Direct phone: (786) 865-3172 Fax: N/A E-mail:marketing@longitudefl.com Website:Longitudesurveyors.com Please find attached our Organizational Chart, along with the resumes of our Staff and Project Team. 25 The BetaJones Group/RFQ#26-07-01 Organizational CHART ORGANIZATIONAL CHART Mr. Luis A. Betalleluz, P.E. The BetaJones Group, Inc Project Manager, Senior Hydrologist, Civil Engineer of Record Adriana Hegeman, P.E. The BetaJones Group, Inc Assistant Project Manager/ Senior Civil Engineer Eduardo Suarez, PSM Longitude Surveyors, LLC Chief Surveyor/ Principal Rutu Nulkar, P.E. Terracon Consultants, Inc Senior Geotechnical Engineer Steven Harrison, P.G. Terracon Consultants, Inc Principal Geologist Javier Jimenez, P.E. Terracon Consultants, Inc Senior Materials Engineer/QA/QC Wayne Dolese The BetaJones Group, Inc Business Development/ Project Coordinator Michelle C. Lopez The BetaJones Group, Inc Technical Assistant Rosina Good The BetaJones Group, Inc Administrative Assistant Eddy Briel The BetaJones Group, Inc Senior Field Superintendent Eddy Briel Jr. The BetaJones Group, Inc Master Plumber Jose Luis Benitez The BetaJones Group, Inc Technical Staff Supervisor Fernando Anzoategui, P.E. ProCon Emgineering, Inc Principal MEP William Caycedo, P.E. Bliss & Nyitray, Inc Principal Structural Engineer Greg Bouie, PSM Longitude Surveyors, LLC Project Manager Joseph D. Edwards Longitude Surveyors, LLC Assistant Project Manager 26 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Luis A. Betalleluz, P.E. Principal / Project Manager Graduate of the University of Florida’s College of Engineering and President of The BetaJones Group, Mr. Betalleluz provides leadership, professional business ethic, as well as technical expertise in managing, designing, permitting, coordinating, inspecting, and reviewing Civil Engineering Projects. He is a former the Chair of the Builders Association of South Florida’s Green Building Council and Environmental Code Committees, and a member of the American Society of Civil Engineers, Builders Association of North Central Florida, American Water Resources Association, Environment and Water Resources Institute, and Transportation and Development Institute. In 2009 and 2010 Mr. Betalleluz was selected by the National Home Builders Association to Judge the best communities built in Florida at the Florida Parade of Homes. In his early profession, Mr. Betalleluz worked for the White House Advance Team under President William Jefferson Clinton. Mr. Betalleluz’s civil engineering experience expands across the state of Florida and the Caribbean in both the public and private sectors. His areas of expertise include: project management, comprehensive permitting, site planning, stormwater management facility design, utility transmission system design, grading plan design, hydraulic studies, and LEED certification. His experience includes the planning and design of hydrologic restoration, mitigation projects, new development, renovations, commercial, residential, industrial, and municipal sites. He has performed site-civil services on major projects such as: large residential subdivisions, residential condominiums/buildings, site rehabilitation, commercial centers, industrial parks, mixed-use sites, college campus additions, and roadways. Mr. Betalleluz also brings specialized services such as extensive experience in the FDEP NPDES Program for Industrial and Construction Activities. Additional expertise in erosion & sedimentation control design & inspection, including Stormwater Pollution Prevention Plans (SWPPP), Cost-Benefit analyses, and construction estimates. PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Florida Registered Professional Engineer # 65892 LEED Accredited Professional – New Construction – USGBC AdICPR Stormwater Modeling - Advanced Training Program Certification Certified NPDES Erosion Control Mgmt. Inspector – FDEP Certified for Maintenance of Traffic (MOT) Plan Design - ATSSA Certified in Sales Engineering – University of Florida EDUCATION B.S. Civil Engineering – University of Florida Minor in Business Administration – University of Florida PROFESSIONAL EXPERIENCE The BetaJones Group, Inc. –Miami, Florida - Present o President Langan Engineering and Environmental Services - Miami, Florida - Past o Site-Civil Engineering Department Manager - Miami Office Water & Air Research, Inc. - Gainesville, Florida - Past o Civil/Land Development Engineer o Engineer Technician Peter Kiewit Sons’ Inc./ Gilbert Southern Corp. - Ft. Lauderdale, Florida - Past o Civil Engineer 27 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT PROFESSIONAL SERVICE AREAS Site Plan Design o Property Condition Assessments o Due Diligence o Conceptual Layout o Final Site Plan Site-Civil Engineering Design & Permitting o Green Building Design o Stormwater Management Facilities o Paving, Grading, and Drainage o Utility Transmission Systems o Maintenance of Traffic (MOT) Design o Waste Management Master Plans Erosion and Sedimentation Control Plans o NPDES permitting and inspections o Stormwater Pollution Prevention Plans o Industrial activity control reports o Construction activity reports Floodplain Studies o Floodplain limit analysis o F.E.M.A. Floodplain Certifications Construction Engineering Administration o Construction Estimates o Cost-Benefit Analysis o As-Built Certifications Hydrologic Restoration o Historical site analysis o Watershed delineation o Groundwater Modeling o Mitigation Planning and Design Sanitary & Drainage System Certifications Sustainable/Green Design Design-Build RELATED PROJECT EXPERIENCE City of Hallandale Master Pump Station 9 rebuild, upgrades, and modernization. o Assessment, Pump Station Upgrade, and Modernization of the City’s PS9 System to handle Future Flow up to the year 2030. Design, Permitting and Full System Upgrade as part of a Master Sewer Plan Update throughout the whole City. o Hallandale Beach, Broward, Florida Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. o Miami-Dade County, Florida Miami-Dade Transit Busway Improvements o Design and Permitting of bus stop improvements for ADA compability on over 200 bus shelter sites in 12 different Municipalities in Miami-Dade. o Doral, Homestead, North Miami, North Miami Beach, Florida City, El Portal, Miami Lakes, Miami Gardens, Surfside, Medley, Opa-Locka, Bay Harbor Islands, Miami-Dade, Florida Zoo Miami Amphitheatre o Renovation of site, drainage, and utilities Zoo main amphitheatre o Miami-Dade County, Florida City of Hallandale Beach NW 7th Avenue Drainage Improvements o Design & permitting drainage improvements project throughout 3 city residential & commercial blocks o Hallandale Beach, Broward, Florida Starwoods Tribute/ Element Hotel + 1,000 LF Watermain Extension o Design of a Luxury Hotel Infrastructure, including a 1,000 LF 8” watermain extension on NE 3rd Avenue.. o Ft. Lauderdale, Broward County, FL I-95 & Pembroke Road Pump Station o Design-Build of 2.5 mile master drainage pipeline and pump station project, including micro tunneling under I-95, trenching and boring under major arterial roadways. o Hallandale + Pembroke + Hollywood, Broward County, Florida Miami Beach, Bay Road Drainage Improvements o Design and permitting for the design- build of a roadway and major drainage improvements project throughout Bay Road. Including stormwater planning, production of a Master Drainage Plan with the ICPR modeling program to alleviate drainage impacts in front of the Flamingo Resort and surrounding residences. o Miami Beach, Miami-Dade County, Florida 28 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT ADDITIONAL PROJECT EXPERIENCE Dillard High School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Ft. Lauderdale, Broward County, FL Mc Fatter Vocation College Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County, FL Pinecrest Gardens ADA Walkway o Design and permitting of over 2.5 miles of this Botanical Garden’s Walking Trails to comply with Florida ADA Code. Design included extensive grading and complicated phasing of the project to avoid destruction of existing botanical plant life adjacent to walking trails. o Pinecrest, Miami-Dade County, Florida Zoo Miami Florida Exhibit & Park Entrance o Complete Value Engineering Analysis and Design Review of Proposed Renovation of Zoo Miami. o Miami, Miami-Dade County, Florida North Glade Park Community Center o Civil and Structural Design and Permitting of an 4 Acre MDPROS Park Improvement Project in Carol City. Improvements include the modernization of the Park Clubhouse, design of the park basketball courts, parking, drainage, and other infrastructure improvements throughout the park. o Silver LEED Certification – Goal o Miami-Dade County, Florida SJRCC Performing Arts Center o Design, modeling, and permitting of site, drainage, and utilities St. John River Community College Arts Center o Middleburg, Clay County, Florida Plantation Middle School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Plantation, Broward County, FL Live Like Bella Park o Civil and Structural Design and Permitting of an 8.6 Acre MDPROS Park Improvement Project near Homestead. Improvements include the modernization of the Park Clubhouse, covered loggia, additional clubhouse building, and site infrastructure improvements throughout the park. o Silver LEED Certification – Goal o Miami-Dade County, Florida Tedder Elementary Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County, FL Miami Free Zone Expansion o Design, modeling, and permitting of site addition, drainage, and utility improvements, including a 7-Story Parking Garage, Office Building, and parking lot redesign to accommodate standard and oversized vehicle capacity on a 32- Acre Warehouse Secured Site. o Doral, Miami-Dade, Florida St. Thomas University NCAA Sport Field/ Football/ Soccer/and Lacrosse Stadium o Design and Permitting for the development of a new NCAA Certified Sports Stadium to include an NCAA Certified Artificial Turf Sports Field for Football, Soccer and Lacrosse. with additional site improvements. o Miami-Dade County, Florida North Miami Bus Shelter and Bus Hub o Design and Permitting of bus stop improvements for ADA compability on over 26 bus shelter sites within the City of North Miami plus the construction of the North Miami Bus Hub by City Hall. 29 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT o North Miami, Miami-Dade, Florida Seminole - Big Cypress Cemetery o Site improvements and hydrological study for a cemetery expansion, design, modeling, and permitting of site, drainage, and utilities for the Seminole Tribe of Florida. o Hendry County, Florida 3rd District Court - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of an existing government building’s sanitary sewer system including pump station, and cleanouts. o Miami-Dade County, Florida Tropical Park Track and Field Stadium o Design and Permitting to upgrade the Tropical Park Track and Field Sports Stadium to include a USATF and IAAF Certified Olympic Track & Field Events Area and an NCAA Certified Artificial Turf Sports Field for Football, Soccer and Lacrosse.with additional site improvements. o Miami-Dade County, Florida Opa Locka Airport - Fire-Rescue Heliport o Design, modeling, and permitting of the Miami-Dade County's Fire Rescue Station No. 25 Heliport with associated infrastructure within the Opa-Locka Airport. o Miami-Dade County, Florida West Kendall District Park - Phase 1 o Prime Consultant: Master Plan and engineering design for the development of 155 Acres of existing agricultural land into a new state of the art Park and Recreational Facility. o Miami-Dade County, Florida Homestead Air Force Base Armory Expansion o Site Improvements, including drainage renovations and utility upgrades of an existing Military Building for the Department of Military Affairs o Miami, Miami-Dade County, Florida Biscayne Gardens Elementary o School Renovation Project o Design, modeling, and permitting of infrastructure improvements for school. o North Miami, Miami-Dade, Florida MIA Fumigation Facility o Design, modeling, and permitting of site, parking, and utility improvements for a proposed Miami International Airport fumigation storage facility located at the SW corner of the MIA property. o Miami-Dade County, Florida Goodwill Industrial Laundry Facility o Design, permitting, and construction management of an industrial water well system, gravity and pressured sewer systems to serve a major industrial laundry facility. o Miami-Dade County, Florida Border Patrol Detainee Center o Design, modeling, and permitting of site, drainage, and utilities for the Department of Homeland Security on a 4.3 acre wetland. Project included major drainage design and permitting with the U.S. Corps of Engineers. o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Dania Beach, Broward County, Florida Department of Military Affairs Miramar Military Base Training Facilities o Design and permitting of military training building addition including site, utility, and, drainage improvements. Permitting through the Department of Military Affairs, City of Miramar. Miramar, Broward County, Florida Seminole Tribe - Hollywood Security Access o Design of new security perimeter, including gates, fencing, barriers, and guard houses in the residential area of the reservation. o Hollywood Seminole Indian Reservation, Broward County, Florida Rio Fajardo (Fajardo River) Mitigation Plan o Hydraulic Study, Mangrove Restoration, Plan for a 85-Acre site near Punta Fajardo, Puerto Rico. o Designed and permitted for the U.S. Army Corps of Engineers 30 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Seminole Native Learning Center o Building conversion and site re- development, design, modeling, and permitting of site, parking, drainage, and utilities of an existing commercial bldg. for The Seminole Tribe of Florida o Gold LEED Certification – in progress o Hollywood, Broward County, Florida Seminole - Big Cypress Family Services o Design of parking lot, utility, stormwater system, and grading improvements for Foster Care Facility. o Big Cypress Seminole Indian Reservation Seminole Tribe - Ft. Pierce Security Access o Design of new security perimeter, including gates, fencing, barriers, and guard houses in the residential area of the reservation. o Ft. Pierce, St. Lucie County, Florida Miami Cargo Park o Design, modeling, and permitting of site parking additions, drainage, and utility improvements, including implementation of sustainable products such as permeable asphalt design for a 23-acre, 600,000 SF, Warehouse and UPS distribution Facility. o Doral, Miami-Dade County, Florida Robert M. Ballad Armory Expansion o Site Improvements, including drainage renovations and utility upgrades of an existing Military Building for the Department of Military Affairs o Miami, Miami-Dade County, Florida Florida Fish & Wildlife CC - Royce Unit o 2,700 Acre Hydrologic Study and Hydraulic Restoration Project o Highlands County, Florida Haile Plantation Historical Estate o Design, modeling, and permitting of site improvements, drainage, and utilities for the 20-acre project. Included the design of museum parking areas, gift shop building with associated infrastructure and drainage repairs for the historical site.. o Kanapaha, Alahua County, Florida Ensenada Condominiums - 40-Year Recertification Project o Professional Engineering Inspections, Design Improvements, and Construction Administration of the Structural and life Safety Systems of 2- 40-Year old, 8-story buildings with 276 unit res. community on an 8-Acre Site o Aventura, Miami-Dade, Florida Marina Del Ray Homes o Design, modeling, and permitting of site, accessibility, drainage, and utilities for a 100-Unit Multi-Family Subdivision, 55+ Community o Beverly Hills, Citrus County, Florida Promenade at Coconut Creek o Design, modeling, and permitting of site, drainage, and utilities for a Mainstreet Development Mix-use condo, office, and retail lifestyle center o LEED Certification o Coconut Creek, Broward, Florida Santa Maria Golf and Country Club o 700-acre Mixed-Use Project including Retail Center, High and Low Density Residential Areas, Country Club, Banquet Hall, and Jack Nicklaus Signature Golf Course. o Panama City, Panama Karanda I Village Foundation Stabilization o Design and Permitting of Erosion and Sedimentation Control and Foundation Stabilization for a 30-Acre Residential Subdivision. o Coconut Creek, Broward, Florida Golden Lakes Village Association - Roofing Rehabilitation Project o Design of Roofing Rehabilitation for a 315-acre, 182 multi-family townhome residential subdivision. Including detailed engineering specifications, evaluations and final certification. o West Palm Beach, Palm Beach County, Florida Karanda I Village Site Rehabilitation o Design and Permitting of Asphalt Rehabilitation improvements for a 30- Acre Residential Subdivision o Coconut Creek, Broward, Florida 31 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Alhambra West – LEED Certification o Production of a Waste Management Master Plan of a 14-story office building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification o Coral Gables, Miami-Dade County, Florida Pinto’s Farm Land Development Study o Engineering property assessment to assist the client in the land development, property selection process. The study focused on the current property parameters, constrains, and the feasibility of future development of several properties. o Miami-Dade County, Florida Dollar General Franchise Store o Design, modeling, and permitting of site, drainage, and utilities o Levy County, Florida Karanda I Village Reserve Study & Engineering Estimates o Engineering Estimates for a 30-Acre Residential Subdivision’s master improvement and rehabilitation plan o Coconut Creek, Broward, Florida Southern Mills Business Park o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Palm Beach County, Florida Wachovia Center-Tampa–LEED Certification o Production of a Waste Management Master Plan of a 22-story office building with associated parking garage to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Tampa, Hillsborough County, Florida Deering Bay Country Club (www.dbycc.com) o 70-acre Golf Course Redesign Project and conversion into an Arnold Palmer Signature Course. o Coral Gables, Miami-Dade, Florida Alhambra Plaza – LEED Certification o Production of a Waste Management Master Plan of a 14-story office building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Coral Gables, Miami-Dade County, Florida Neuhut Commercial Property o Building Additions & Improvement Project o Bay Harbor Islands, Miami-Dade, Florida Montclair Oaks Multi-Family Subdivision o Design, modeling, and permitting of site, drainage, and utilities for a 100- Unit Multi-Family Subdivision o Lake County, Florida Avila Condominium Capital Improvements o Design, modeling, and permitting of site, parking, drainage, and sewer to rehabilitate a 40-year old, 4, 4-story buildings, 360 unit residential 55+ community on a 10-acre site. o Sunny Isles Beach, Miami-Dade, Florida Kanapaha Station o Design, modeling, and permitting of site, drainage, and utilities for a 3-Acre Strip Mall o NPDES Construction Activity Report o Alachua County, Florida Datran Center 1 and 2 – LEED Certification o Production of a Waste Management Master Plan of 2- 21-story office buildings to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Miami-Dade County, Florida 32 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT 450 Las Olas Blvd. - LEED Certification o Production of a Water Management Master Plan of an 15-story mix-use office-residential-retail building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification o Miami, Miami-Dade County, Florida MIA Midfield Phase III o Worked on the master takeoff which included pavement rehabilitation, construction of utilities (water, sewer, and drainage), demolition of buildings, clearing & grubbing, and removal of miscellaneous items (airport lights, , bldg. equipment, etc). Served as estimating engineer. o Miami-Dade County, Florida The Columbus Center – LEED Certification o Production of a Waste Management Master Plan of a 14-story office building on a 3-acre site to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Coral Gables, Miami-Dade County, Florida 350 Las Olas Blvd. - LEED Certification o Production of a Water Management Master Plan of an 18-story mix-use office-residential-retail building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification o Miami, Miami-Dade County, Florida GMAIR Warehouse - Engineering Study o Comprehensive engineering analysis of an industrial office/warehouse. Including coordination with regulatory agencies to assist in large scale code compliance improvements and building rehabilitation. o Doral, Miami-Dade County, Florida 26 Star Island Residency - Interior and Exterior Railing Systems o Structural design, certification and permitting of a luxury hand rail system and gated entrance for a high-end residential estate. o Star Island, Miami Beach, Miami-Dade County, Florida 1 Brickell Square – LEED Certification o Production of a Waste Management Master Plan of a 26-story office building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Miami, Miami-Dade County, Florida Pinto’s Farm Development Project o Design and permitting of water and sewer utilities for a 15-acre agricultural site and farmers market including a potable water well, primary and secondary septic treatment units. o Miami-Dade County, Florida Isaia Property Drainage Improvements o Design and permitting of a stormwater management system and landscape irrigation system. Including design of a stormwater drainage well, design of a cistern, and associated infrastructure for irrigation purposes. o Coconut Grove, Miami-Dade County, Florida The Sheldon Hotel – Property Conditions Assessment Report o Engineering Site and Structural Assessment of an existing 1943 beachfront hotel along the Hollywood Beach historic boardwalk, including the identification of ADA updates and community connectivity improvements o Hollywood Beach, Broward County, Florida 280 South Parkway - Seawall Inspections o Site Investigation and production of a detailed engineering report on the conditions of an existing inter-coastal 33 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT seawall. Including, historical permitting information, seawall component conditions and repair work recommendations o Golden Beach, Miami-Dade County, Florida Dezer/Trump Development Group - Exotic Car Museum Property Conditions Assessment Report o Engineering Site and Structural Assessment of an existing abandoned gas station for site conversion into car museum, including the identification of development and improvement options o North Miami Beach, Miami-Dade County, Florida Cycle World Office/Retail Site Renovation o Building conversion from a church to office and retail and site re- development, design, and permitting of site, parking, drainage, and utilities of an existing commercial bldg. o Miami-Dade County, Florida NW Industrial Properties - Site Improvements o Design and permitting of a recycled asphalt and gravel parking area in the vicinity of a designated contaminated zone. Including production of a stormwater management system and associated infrastructure. o Miami-Dade County, Florida APAC Asphalt SE Plant o NPDES Industrial Activity Report o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Gainesville, Alachua County, Florida O'Riley Stores - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of an existing commercial property's sanitary sewer system including pump station, and cleanouts. o Miami-Dade County, Florida Kendall-Tamiami Airport Hangars o Design and Construction of 2 extra large hangars with driveway, taxiway, reinforced foundation design, with associated parking, utilities, and other infrastructure at Kendall-Tamiami Executive Airport. Served as Project Engineer throughout the Design and Construction of the project. o Silver LEED Certification o Miami-Dade County, Florida Wynwood Neighborhood Service Center o Government Building site renovation and neighborhood re-development, design, modeling, and permitting of site, accessibility, parking, drainage, community connectivity and utilities for the expansion of Miami’s Design District o Silver LEED Certification – Goal o Miami, Miami-Dade County, Florida MIA Westside Fuel Tender Facilites o Construction of the Westside Fueling Facilities with associated parking, access roads, utilities and other infrastruture at Miami International Airport. Served as the Office Engineer throughout the Construction of the project. o Miami-Dade County, Florida Santa Fe Community College – Pond A o Design and Permitting of 20-Acre Master Stormwater Plan. o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Gainesville, Alachua County, Florida St. Thomas University - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of the existing sanitary sewer system for a private University on a 127.5-Acre Campus with Multiple Educational Buildings. o Miami Gardens, Miami-Dade County, Florida The Marian Center - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of the existing special needs school with multiple educational Facility Buildings. o Miami-Dade County, Florida Sunshine Oil Gas Station - Multiple Sites - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of pipe, pump station, sewer laterals, mains, manholes, and cleanouts for multiple gas station sites. o Miami-Dade County, Florida 34 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Shoma Village - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of an existing multifamily building subdivision's sanitary sewer system including pump station, and cleanouts. o Miami-Dade County, Florida Laguna Club Condominiums - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of an existing multifamily building subdivision's sanitary sewer system including pump station, and cleanouts. o Miami-Dade County, Florida Miami Shipping Container Facility - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of an existing industrial property's sanitary sewer system including pump station, and cleanouts. o Miami-Dade County, Florida South Motors Dodge - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of an existing car delaershop’s sanitary sewer system including pump station, and cleanouts. o Miami-Dade County, Florida Pace High School - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of the existing sanitary sewer system for a private High School with Multiple Educational Buildings. o Miami-Dade County, Florida St. Thomas University - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of 127-Acre 30 Building University Campus’ sanitary sewer system including over 3-Miles of pipe, 3 pump stations, sewer laterals, mains, manholes, and cleanouts. o Miami Gardens, Miami-Dade County, Florida 35 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Adriana Hegeman, P.E. Assistant Project Manager Ms. Hegeman is an licensed professional Civil engineer with over 31 years of experience in surface and groundwater quality assessments, stormwater management, and Utility modeling. Her experience in stormwater management systems have ranged from large watershed analyses (i.e., delineation’s and water quantity and quality calculations) to design of site-specific management systems. Related to project-level stormwater management systems, Ms. Hegeman’s experience includes: determining drainage areas, calculating stormwater runoff volumes, performing flood routing calculations, designing basins and inflow/outflow structures, preparing drawings, and completing permit applications. Ms. Hegeman’s civil engineering experience expands across the states of Florida, North Carolina, South Carolina, Georgia and Texas, in both the public and private sectors. Her areas of expertise include project management, comprehensive permitting, site planning, stormwater management facility design, utility transmission system design, grading plan design, and hydraulic studies. His experience includes the planning and design of hydrologic restoration, mitigation projects, new development, renovations, commercial, residential, industrial, and municipal sites. He has performed site-civil services on major projects such as: large residential subdivisions, residential condominiums/buildings, site rehabilitation, commercial centers, industrial parks, mixed-use sites, college campus additions, and roadways. Mr. Hegeman earned an MBA at the University of North Carolina, Master’s of Engineering from the University of Florida and also brings specialized services such as Value Engineering and Product Selection, and Accurate Cost Estimating, making her an integral part of The BetaJones Group. Additional expertise include Department of Transportation and South Florida Water Management District Design Standards and Permitting Process. PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Florida Registered Professional Engineer # 61699 EDUCATION B.S. Civil Engineering – University of Andres Vello M.E. Civil Engineering – University of Florida Master of Business Administration (Cum Laude) – University of North Carolina PROFESSIONAL EXPERIENCE The BetaJones Group, Inc. –Miami, Florida - Present o Assistant Project Manager / Lead Civil Engineer Crawford Design Company - Fayetteville, North Carolina - Past o Principal / VP / Senior Manager Water & Air Research, Inc. - Gainesville, Florida - Past o Project Manager Volkert & Associates. - Gainesville, Florida - Past o Project Manager Eng. Denman & Associates - Gainesville, Florida - Past o Project Engineer The Rose Group – Fayetteville, North Carolina - Past o Project Engineer 36 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT PROFESSIONAL SERVICE AREAS Site Plan Design o Property Condition Assessments o Due Diligence o Conceptual Layout o Final Site Plan Site-Civil Engineering Design & Permitting o Green Building Design o Stormwater Management Facilities o Paving, Grading, and Drainage o Utility Transmission Systems o Maintenance of Traffic (MOT) Design o Waste Management Master Plans Erosion and Sedimentation Control Plans o NPDES permitting and inspections o Stormwater Pollution Prevention Plans o Industrial activity control reports o Construction activity reports RELATED PROJECT EXPERIENCE Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. o Miami-Dade County, Florida Mc Fatter Vocation College Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County, FL Starwoods Tribute/ Element Hotel + 1,000 LF Watermain Extension o Design of a Luxury Hotel Infrastructure, including a 1,000 LF 8” watermain extension on NE 3rd Avenue.. o Ft. Lauderdale, Broward County, FL I-95 & Pembroke Road Pump Station o Design-Build of 2.5 mile master drainage pipeline and pump station project, including micro tunneling under I-95, trenching and boring under major arterial roadways. o Broward County, Florida Floodplain Studies o Floodplain limit analysis o F.E.M.A. Floodplain Certifications Construction Engineering Administration o Construction Estimates o Cost-Benefit Analysis o As-Built Certifications Hydrologic Restoration o Historical site analysis o Watershed delineation o Groundwater Modeling o Mitigation Planning and Design Structural Design and Analysis LEED Accredited Professional Design-Build o Dillard High School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Ft. Lauderdale, Broward County, FL Plantation Middle School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Plantation, Broward County, FL Tedder Elementary Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County, FL Miami-Dade Transit Busway Improvements o Design and Permitting of bus stop improvements for ADA compability on over 200 bus shelter sites in 12 different Municipalities in Miami-Dade. o Doral, Homestead, North Miami, North Miami Beach, Florida City, El Portal, Miami Lakes, Miami Gardens, Surfside, 37 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT ADDITIONAL PROJECT EXPERIENCE Miami Beach, Bay Road Drainage Improvements o Design and permitting for the design- build of a roadway and major drainage improvements project throughout Bay Road. Including stormwater planning, oduction of a Master Drainage Plan with the ICPR modeling program. o Miami Beach, Miami-Dade County, Florida Zoo Miami Florida Exhibit & Park Entrance o Complete Value Engineering Analysis and Design Review of Proposed Renovation of Zoo Miami. o Miami, Miami-Dade County, Florida North Glade Park Community Center o Civil and Structural Design and Permitting of an 4 Acre MDPROS Park Improvement Project in Carol City. Improvements include the modernization of the Park Clubhouse, design of the park basketball courts, parking, drainage, and other infrastructure improvements throughout the park. o Silver LEED Certification – Goal o Miami-Dade County, Florida Live Like Bella Park o Civil and Structural Design and Permitting of an 8.6 Acre MDPROS Park Improvement Project near Homestead. Improvements include the modernization of the Park Clubhouse, covered loggia, additional clubhouse building, and site infrastructure improvements throughout the park. o Silver LEED Certification – Goal o Miami-Dade County, Florida Miami Free Zone Expansion o Design, modeling, and permitting of site addition, drainage, and utility improvements, including a 7-Story Parking Garage, Office Building, and parking lot redesign to accommodate standard and oversized vehicle capacity on a 32- Acre Warehouse Secured Site. o Doral, Miami-Dade, Florida North Miami Bus Shelter and Bus Hub o Design and Permitting of bus stop improvements for ADA compability on over 26 bus shelter sites within the City of North Miami plus the construction of the North Miami Bus Hub by City Hall. o North Miami, Miami-Dade, Florida Seminole - Big Cypress Cemetery o Site improvements and hydrological study for a cemetery expansion, design, modeling, and permitting of site, drainage, and utilities for the Seminole Tribe of Florida. o Hendry County, Florida Tropical Park Track and Field Stadium o Design and Permitting to upgrade the Tropical Park Track and Field Sports Stadium to include a USATF and IAAF Certified Olympic Track & Field Events Area and an NCAA Certified Artificial Turf Sports Field for Football, Soccer and Lacrosse.with additional site improvements. o Miami-Dade County, Florida Opa Locka Airport - Fire-Rescue Heliport o Design, modeling, and permitting of the Miami-Dade County's Fire Rescue Station No. 25 Heliport with associated infrastructure within the Opa-Locka Airport. o Miami-Dade County, Florida West Kendall District Park - Phase 1 o Prime Consultant: Master Plan and engineering design for the development of 155 Acres of existing agricultural land into a new state of the art Park and Recreational Facility. o Miami-Dade County, Florida Homestead Air Force Base Armory Expansion o Site Improvements, including drainage renovations and utility upgrades of an existing Military Building for the Department of Military Affairs o Miami, Miami-Dade County, Florida MIA Fumigation Facility o Design, modeling, and permitting of site, parking, and utility improvements for a proposed Miami International Airport fumigation storage facility 38 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT located at the SW corner of the MIA property. o Miami-Dade County, Florida SJRCC Performing Arts Center o Design, modeling, and permitting of site, drainage, and utilities St. John River Community College Arts Center o Middleburg, Clay County, Florida Biscayne Gardens Elementary o School Renovation Project o Design, modeling, and permitting of infrastructure improvements for school. o North Miami, Miami-Dade, Florida Goodwill Industrial Laundry Facility o Design, permitting, and construction management of an industrial water well system, gravity and pressured sewer systems to serve a major industrial laundry facility. o Miami-Dade County, Florida Border Patrol Detainee Center o Design, modeling, and permitting of site, drainage, and utilities for the Department of Homeland Security on a 4.3 acre wetland. Project included major drainage design and permitting with the U.S. Corps of Engineers. o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Dania Beach, Broward County, Florida Department of Military Affairs Miramar Military Base Training Facilities o Design and permitting of military training building addition including site, utility, and, drainage improvements. Permitting through the Department of Military Affairs, City of Miramar. Miramar, Broward County, Florida Seminole Tribe - Hollywood Security Access o Design of new security perimeter, including gates, fencing, barriers, and guard houses in the residential area of the reservation. o Hollywood Seminole Indian Reservation, Broward County, Florida Rio Fajardo (Fajardo River) Mitigation Plan o Hydraulic Study, Mangrove Restoration, Plan for a 85-Acre site near Punta Fajardo, Puerto Rico. o Designed and permitted for the U.S. Army Corps of Engineers Seminole Native Learning Center o Building conversion and site re- development, design, modeling, and permitting of site, parking, drainage, and utilities of an existing commercial bldg. for The Seminole Tribe of Florida o Gold LEED Certification – in progress o Hollywood, Broward County, Florida Seminole - Big Cypress Family Services o Design of parking lot, utility, stormwater system, and grading improvements for Foster Care Facility. o Big Cypress Seminole Indian Reservation Seminole Tribe - Ft. Pierce Security Access o Design of new security perimeter, including gates, fencing, barriers, and guard houses in the residential area of the reservation. o Ft. Pierce, St. Lucie County, Florida Miami Cargo Park o Design, modeling, and permitting of site parking additions, drainage, and utility improvements, including implementation of sustainable products such as permeable asphalt design for a 23-acre, 600,000 SF, Warehouse and UPS distribution Facility. o Doral, Miami-Dade County, Florida Robert M. Ballad Armory Expansion o Site Improvements, including drainage renovations and utility upgrades of an existing Military Building for the Department of Military Affairs o Miami, Miami-Dade County, Florida Florida Fish & Wildlife CC - Royce Unit o 2,700 Acre Hydrologic Study and Hydraulic Restoration Project o Highlands County, Florida Haile Plantation Historical Estate o Design, modeling, and permitting of site improvements, drainage, and utilities for the 20-acre project. Included the design of museum parking areas, gift shop building with associated 39 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT infrastructure and drainage repairs for the historical site.. o Kanapaha, Alahua County, Florida Ensenada Condominiums - 40-Year Recertification Project o Professional Engineering Inspections, Design Improvements, and Construction Administration of the Structural and life Safety Systems of 2- 40-Year old, 8-story buildings with 276 unit res. community on an 8-Acre Site o Aventura, Miami-Dade, Florida Marina Del Ray Homes o Design, modeling, and permitting of site, accessibility, drainage, and utilities for a 100-Unit Multi-Family Subdivision, 55+ Community o Beverly Hills, Citrus County, Florida o West Palm Beach, Palm Beach County, Florida Alhambra West – LEED Certification o Production of a Waste Management Master Plan of a 14-story office building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification o Coral Gables, Miami-Dade County, Florida Karanda I Village Site Rehabilitation o Design and Permitting of Asphalt Rehabilitation improvements for a 30- Acre Residential Subdivision o Coconut Creek, Broward, Florida Promenade at Coconut Creek o Design, modeling, and permitting of site, drainage, and utilities for a Mainstreet Development Mix-use condo, office, and retail lifestyle center o LEED Certification o Coconut Creek, Broward, Florida Zoo Miami Amphitheatre o Renovation of site, drainage, and utilities Zoo main amphitheatre o Miami-Dade County, Florida Santa Maria Golf and Country Club o 700-acre Mixed-Use Project including Retail Center, High and Low Density Residential Areas, Country Club, Banquet Hall, and Jack Nicklaus Signature Golf Course. o Panama City, Panama Karanda I Village Foundation Stabilization o Design and Permitting of Erosion and Sedimentation Control and Foundation Stabilization for a 30-Acre Residential Subdivision. o Coconut Creek, Broward, Florida Golden Lakes Village Association - Roofing Rehabilitation Project o Design of Roofing Rehabilitation for a 315-acre, 182 multi-family townhome residential subdivision. Including detailed engineering specifications, evaluations and final certification. Pinto-Castro Land Development Study o Engineering property assessment to assist the client in the land development, property selection process. The study focused on the current property parameters, constrains, and the feasibility of future development of several properties. o Miami-Dade County, Florida Dollar General Franchise Store o Design, modeling, and permitting of site, drainage, and utilities o Levy County, Florida Karanda I Village Reserve Study & Engineering Estimates o Engineering Estimates for a 30-Acre Residential Subdivision’s master improvement and rehabilitation plan o Coconut Creek, Broward, Florida Southern Mills Business Park o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Palm Beach County, Florida Wachovia Center-Tampa–LEED Certification o Production of a Waste Management Master Plan of a 22-story office building with associated parking garage to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by 40 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Tampa, Hillsborough County, Florida Deering Bay Country Club (www.dbycc.com) o 70-acre Golf Course Redesign Project and conversion into an Arnold Palmer Signature Course. o Coral Gables, Miami-Dade, Florida Alhambra Plaza – LEED Certification o Production of a Waste Management Master Plan of a 14-story office building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Coral Gables, Miami-Dade County, Florida Neuhut Commercial Property o Building Additions & Improvement Project o Bay Harbor Islands, Miami-Dade, Florida Montclair Oaks Multi-Family Subdivision o Design, modeling, and permitting of site, drainage, and utilities for a 100- Unit Multi-Family Subdivision o Lake County, Florida Avila Condominium Capital Improvements o Design, modeling, and permitting of site, parking, drainage, and sewer to rehabilitate a 40-year old, 4, 4-story buildings, 360 unit residential 55+ community on a 10-acre site. o Sunny Isles Beach, Miami-Dade, Florida Kanapaha Station o Design, modeling, and permitting of site, drainage, and utilities for a 3-Acre Strip Mall o NPDES Construction Activity Report o Alachua County, Florida Datran Center 1 and 2 – LEED Certification o Production of a Waste Management Master Plan of 2- 21-story office buildings to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Miami-Dade County, Florida 450 Las Olas Blvd. - LEED Certification o Production of a Water Management Master Plan of an 15-story mix-use office-residential-retail building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification o Miami, Miami-Dade County, Florida MIA Midfield Phase III o Worked on the master takeoff which included pavement rehabilitation, construction of utilities (water, sewer, and drainage), demolition of buildings, clearing & grubbing, and removal of miscellaneous items (airport lights, , bldg. equipment, etc). Served as estimating engineer. o Miami-Dade County, Florida The Columbus Center – LEED Certification o Production of a Waste Management Master Plan of a 14-story office building on a 3-acre site to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Coral Gables, Miami-Dade County, Florida 350 Las Olas Blvd. - LEED Certification o Production of a Water Management Master Plan of an 18-story mix-use office-residential-retail building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification o Miami, Miami-Dade County, Florida 41 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT GMAIR Warehouse - Engineering Study o Comprehensive engineering analysis of an industrial office/warehouse. Including coordination with regulatory agencies to assist in large scale code compliance improvements and building rehabilitation. o Doral, Miami-Dade County, Florida 26 Star Island Residency - Interior and Exterior Railing Systems o Structural design, certification and permitting of a luxury hand rail system and gated entrance for a high-end residential estate. o Star Island, Miami Beach, Miami-Dade County, Florida 1 Brickell Square – LEED Certification o Production of a Waste Management Master Plan of a 26-story office building to acquire Gold Certification through the Leadership in Energy and Environmental Design (LEED) Green Building Rating System as set forth by the United States Green Building Council (USGBC) o Gold LEED Certification – in progress o Miami, Miami-Dade County, Florida Pinto Castro Ranch Development Project o Design and permitting of water and sewer utilities for a 15-acre agricultural site and farmers market including a potable water well, primary and secondary septic treatment units. o Miami-Dade County, Florida Isaia Property Drainage Improvements o Design and permitting of a stormwater management system and landscape irrigation system. Including design of a stormwater drainage well, design of a cistern, and associated infrastructure for irrigation purposes. o Coconut Grove, Miami-Dade County, Florida The Sheldon Hotel – Property Conditions Assessment Report o Engineering Site and Structural Assessment of an existing 1943 beachfront hotel along the Hollywood Beach historic boardwalk, including the identification of ADA updates and community connectivity improvements o Hollywood Beach, Broward County, Florida 280 South Parkway - Seawall Inspections o Site Investigation and production of a detailed engineering report on the conditions of an existing inter-coastal seawall. Including, historical permitting information, seawall component conditions and repair work recommendations o Golden Beach, Miami-Dade County, Florida Dezer/Trump Development Group - Exotic Car Museum Property Conditions Assessment Report o Engineering Site and Structural Assessment of an existing abandoned gas station for site conversion into car museum, including the identification of development and improvement options o North Miami Beach, Miami-Dade County, Florida Cycle World Office/Retail Site Renovation o Building conversion from a church to office and retail and site re- development, design, and permitting of site, parking, drainage, and utilities of an existing commercial bldg. o Miami-Dade County, Florida NW Industrial Properties - Site Improvements o Design and permitting of a recycled asphalt and gravel parking area in the vicinity of a designated contaminated zone. Including production of a stormwater management system and associated infrastructure. o Miami-Dade County, Florida APAC Asphalt SE Plant o NPDES Industrial Activity Report o NPDES Construction Activity Report o Stormwater Pollution Prevention Plan o Gainesville, Alachua County, Florida O'Riley Stores - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of an existing commercial property's sanitary sewer system including pump station, and cleanouts. o Miami-Dade County, Florida 42 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Wayne Mark Dolese Business Development Coordinator Mr. Dolese studies Mass Communication with a focus on Political Communicatio n at Louisiana State University. Mr. Dolese is a business development professional who creates and implements networking strategies to maximize business performance for The BetaJones Group, Inc. He works with key team members to identify new project opportunities in the private sector. Mr. Dolese establis hed the company presence in Raleigh, building strategic partnerships throughout the state of North Carolina. He created the firm's social media presence and online marketing strategy. He also created strategic, outbound marketing campaigns targeted towards new client acquisition. Mr. Dolese is experienced in representing firms at networking and community events around the country such as the Alexandria, VA Chamber of Commerce, Mount Vernon Chamber of Commerce, Prince William County SHRM, and charity events including The Washington Diplomat 15th Annual Embassy Golf Tournament. Mr. Dolese has partnered with clients at all levels from small business startups and entrepreneurs, to Government Contractors both domestically and internationally. PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Business Consultant – US Institute of Diplomacy and Human Rights Strategic Marketing for Entrepreneurs – Duke Continuing Studies Accounting and Finance for Entrepreneurs – Duke Continuing Studies Business Law for Entrepreneurs – Duke Continuing Studies Supply Chain Management – Duke Continuing Studies Private Investigators Course – State of Louisiana Interview and Interrogation – Wicklander, Zulawski & Associates Criminal Research Provider - PBSA EDUCATION Mass Communication/Political Communication – Louisiana State University PROFESSIONAL EXPERIENCE The BetaJones Group, Inc. –Miami, Florida - Present o Business Development Coordinator Signal Auditing, Inc. – National Coverage – Past o Field Auditor/Investigator Business Capital Risk Control Services, LLC – Washington D.C.- Past o Business Development Executive National Background In vestigations, Inc- Washington D.C., Maryland, Virginia -Past o FCRA Solutions Specialist o National Sales Consultant ScreenThem Background Checks. -Alexandria, Virginia- Past o Sales Coordinator Gordon Mckernan Personal Injury Attorneys – Baton Rouge, Louisiana - Past o Private Investigator LIDS Sports Group – New Orleans, Louisiana – Past o Regional Loss Prevention Manager Target – Southern Louisiana Market – Past o Organized Retail Crime Investigator o Community Involvement Coordinator Sears Holding Group – Baton Rouge, Louisiana – Past o Multi-Unit Loss Prevention Manager Bass Pro Shops – Orlando, Florida – Past o Loss Prevention Investigator 43 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT PROFESSIONAL SERVICE AREAS Established Company Presence in New Markets Creating Strategic Partnerships in Current and Developing Markets Create Company Social Media and Networking Strategy SWOT Analysis Search Engine Research Inbound/Outbound Marketing Campaign Strategy Pipeline Development Facilitating Meetings with Staff and Clients Qualifying Leads Managing the Life Cycle of Accounts Creating Client Retention Campaign Strategy Sponsoring/Hosting Netw orking and Community Events Coordinating Team Business Development Strategy 44 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Michelle C. Lopez Marketing Specialist / Office Management Ms. Lopez Studied in University of Phoenix for Accounting and Everest Institute for Business Management and Medical Insurance Billing and Coding. Ms. Lopez has over 20 years of experience in Customer Service and has worked with National and Local Medical and Automotive Corporate Industries . Ms. Lopez worked in Administration related positions for many years and was direct executive assis tant for high level executive in this industries. She has specialized in inter and intra office management and coordination to assure all company tasks and logistics are completed within the required timelines. Ms. Lopez provides leadership, professional business ethic, as well as tremendous organizational skills. Additionally, she has skills in many high level project management software. PROFESSIONAL REGIST RATIONS AND CERTIFICATIONS Medical Insurance Billing & Coding EDUCATION Medical Insurance Billing & Coding – Everest Institute Business Administration- Everest Institute Accounting- University of Phoenix PROFESSIONAL EXPERIENCE The BetaJones Group, Inc. –Miami, Florida - Present o Marketing Specialist o Administrative Assistant South Motors Honda- Miami, Florida - Past o Inventory Clerk o Administrative Assis tant South Florida Pediatric Partners - Miami, Florida - Past o Front Desk o Data Entry Specialist o Insurance Verificator South Motors Infiniti - Miami, Florida - Past o Receptionist o Cashier Jumbo Auto & Truck Plaza - Hollywood, Florida – Past o Receptionist o Cashier PROFESSIONAL SERVICE AREAS Project Administration Team Coordination Bi-Lingual Communications Document Production Support Services Company Bookkeeping Administration Permit Package and Application Management Office Inventory / Logist ics Field Work Coordinator Miami-Dade Airport Airside Clearance Field Work Coordinator 45 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT RELATED PROJECT EXPERIENCE Miami-Dade County You th-Fair and Exposition - Sanitary Sew er Evaluation o Engineering Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. o Miami-Dade County, Florida Mc Fatter Vocation College Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County , FL Starwoods Tribute/ Element Hotel + 1,000 LF Watermain Extension o Design of a Luxury Hotel Infrastructure, including a 1,000 LF 8” watermain extension on NE 3rd Avenue.. o Ft. Lauderdale, Broward County, FL Plantation Middle School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building on site. o Plantation, Broward County, FL Tedder Elementary Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County, FL Miami-Dade Transit Busway Improvements o Design and Permitting of bus stop improvements for ADA compability on over 200 bus shelter sites in 12 different Municipalities in Miami-Dade. o Doral, Homestead, North Miami, North Miami Beach, Florida City, El Portal, Miami Lakes, Miami Gardens, Surfside, I-95 & Pembroke Road Pump Station o Design-Build of 2.5 mile master drainage pipeline and pump station project, including micro tunneling under I-95, trenching and boring under major arterial r oadways. o Broward County, Florida o Dillard High School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Ft. Lauderdale, Broward County, FL 46 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Rosina Angela Good Administrative Assistant/ Office Management Ms. Good has over 30 years of experience in Logistics, Office Management, and Document Production. Ms. Good educational background is in Licensed Nutrition and Dietician, Medical Office Administration, as well as Food Industry Administration and Logistics. She has specialized in inter and intra office management and coordination to assure all company tasks and logistics are completed within the required timelines. Ms. Good provides leadership, professional business ethics, as well as tremendous organizational skills. Additionally, she has skills in many high-level project management software. PROFESSIONAL REGISTRATIONS AND CERTIFICATIONS Nutritionist & Dietician EDUCATION Pharmacy Technician– South Miami Professional Education Program Nursing Assistance- Sunset Adult Educational Centers Nutrition and Diet- University of The Sacred Heart PROFESSIONAL EXPERIENCE The BetaJones Group, Inc. –Miami, Florida - Present o Administrative Assistant o Office Support Staff Papa John’s – Pizzerias, LLC Franchise – Past o Onboarding Specialist o General Manager o Assistant Manager Schlotzky’s Deli - Miami, Florida - Past o Staff Management o Store Logistics Dr. Rueda’s Plastic Surgery Consultants - Past o Nutritionist PROFESSIONAL SERVICE AREAS Team Coordination Bi-Lingual Communications Document Production Support Services Company Bookkeeping Administration Permit Package and Application Management Office Inventory / Logistics 47 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT RELATED PROJECT EXPERIENCE Miami-Dade County Youth-Fair and Exposition - Sanitary Sewer Evaluation o Engineering Study, detailed analysis, and rehabilitation of the existing fairground's 40-year old sanitary sewer system including over 5-Miles of pipe, pump station, sewer laterals, mains, manholes, and cleanouts. o Miami-Dade County, Florida Mc Fatter Vocation College Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County, FL Starwoods Tribute/ Element Hotel + 1,000 LF Watermain Extension o Design of a Luxury Hotel Infrastructure, including a 1,000 LF 8” watermain extension on NE 3rd Avenue. o Ft. Lauderdale, Broward County, FL I-95 & Pembroke Road Pump Station o Design-Build of 2.5-mile master drainage pipeline and pump station project, including micro tunneling under I-95, trenching and boring under major arterial roadways. o Broward County, Florida o Dillard High School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Ft. Lauderdale, Broward County, FL Plantation Middle School Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Plantation, Broward County, FL Tedder Elementary Watermain Improvements o Study and Rehabilitation Design and Permitting the improvement of the watermain system on school campus to provide sufficient fire flow and pressure to every school building onsite. o Deerfield Beach, Broward County, FL Miami-Dade Transit Busway Improvements o Design and Permitting of bus stop improvements for ADA compatibility on over 200 bus shelter sites in 12 different Municipalities in Miami-Dade. o Doral, Homestead, North Miami, North Miami Beach, Florida City, El Portal, Miami Lakes, Miami Gardens, Surfside, 48 The BetaJones Group/RFQ#26-07-01 WILLIAM CAYCEDO, P.E. Principal William has four decades of experience in the field of structural engineering, a significant portion of that with Bliss & Nyitray, Inc. William has been Engineer of Record and Threshold Inspector for many of BNI’s signature and award-winning projects such as the $2 Billion North Terminal Development at Miami International Airport. William takes a hands -on approach to engineering and is very involved in projects setting up structural concepts and systems after comparison studies of various framing systems considering aesthetics, constructability, and economy. His quiet approach to leadership ensures team interaction and participation resulting in projects that are delivered on schedule and uphold BNI’s standards of the highest quality. EDUCATION PROFESSIONAL REGISTRATIONS PROFESSIONAL ASSOCIATIONS Bachelor of Science in Civil Engineering Licensed Professional Engineer - American Institute of Steel New York City College 1978 - Florida Construction Major: Structural Engineering - Puerto Rico - Florida Structural Engineering - U.S. Virgin Islands Society - Light Gauge Steel Engineers Association PROFESSIONAL EXPERIENCE CERTIFIED SPECIAL INSPECTOR CONTACT Experience Prior To BNI: 7 Years - Florida Miami Office - Headquarters With BNI Since 1985 D: (305) 351-0236 C: (786) 269-5852 w-caycedo@bniengineers.com RELEVANT PROJECTS City of Doral Police Facility Expansion, Doral, Florida - A new 1-story, 10,000-SF police sub-station with 225 on- grade parking spaces for employees and City vehicles - Principal-in-Charge, Engineer of Record, Threshold Inspector City of Doral Public Works Maintenance Facility, Doral, Florida - New 2-story, 32,000-GSF building. One part has 2-story offices, and the other part is a single, high-bay maintenance area. - The building is a category 5-rated structure to serve as a hurricane response facility - Principal-in-Charge, Engineer of Record, Threshold Inspector Miami-Dade Correction and Rehabilitation (Jail Site 1), Doral, Florida - The project will replace the outdated Pretrial Detention Center (PTDC) with a modern facility designed to improve the safety, operational efficiency, and inmate housing conditions. - The facility will provide comprehensive mental health care, addiction treatment, and other support services for inmates, including connections to family, attorneys, courts, and community resources. - Principal-in-Charge, Engineer of Record North Miami Police Facility, North Miami, Florida - A new North Miami Police Station, a four-level reinforced concrete structure of some 40,000-SF. The Police force is able to train and maintain vehicles all in one aesthetically pleasing building which is highlighted by a 30-ft. atrium. - Public areas include an ATM machine and a community meeting room accessible on the first floor. - Principal-in-Charge, Engineer of Record Miami-Dade Civil and Probate Courthouse, Miami, Florida - A 23-story building providing more than 600,000-SF of space. 46 finished jury courtrooms and shell space for an additional four courtrooms to accommodate future growth. - Secure parking for 59 vehicles. Site development includes necessary utilities and utility improvements, hardscape, landscape, and road and traffic control improvements. - Principal-in-Charge, Engineer of Record Miami-Dade Children’s Courthouse, Miami, Florida - The Miami-Dade Children's Courthouse reflects the unified family concept combining family courts, traditional courts, state attorney office, public defenders’ office, social service agencies, community meeting spaces, and public gallery space. - This downtown Miami landmark contains approximately 370,000-SF. - Principal-in-Charge, Engineer of Record 49 The BetaJones Group/RFQ#26-07-01 Proposal Requirements Resumes - ProCon Engineering Inc. Fernando Anzoategui, General Mechanical & General Electrical Engineer [Principal & MEP Engineer] Years of Experience: 35 / Years with the Firm: 20 EDUCATION: MBA Finance, Indiana University, 1980 BS Mechanical Engineering, Purdue University, 1976 LICENSING & REGISTRATIONS: Professional Engineer FL– #36032 PROFESSIONAL AFFILIATIONS: NFPA, LEED, ASHRAE Mr. Anzoategui's technical expertise includes specialization in HVAC, Electrical, fire alarm, plumbing, fire protection, and computerized energy analysis. He has provided mechanical and electrical consulting engineering services to a broad range of clients and has completed projects for commercial, institutional, and light industrial projects. During his tenure as Chief Mechanical Engineer for an architectural/engineering firm in Florida, Mr. Anzoategui was responsible for the design of building mechanical systems, including HVAC, plumbing, fire protection and diesel- electric generating plant systems. He was additionally responsible for planning and development of the engineering for such projects, performing computerized energy and economic analysis of new and existing large buildings with TRACE 700 and evaluating and adjusting manpower requirements and construction supervision. Experience Role on Select Projects Below: Mechanical, Electrical, Plumbing, Fire Sprinkler Design and Consulting Engineer Hollywood Hills Senior High Major Alterations Phase 2 l Hollywood, FL Mechanical/Electrical/Plumbing/Fire Sprinkler Engineering Design as follows to upgrade Main Buildings AHU’s, Fire Sprinklers, Chillers, New FA & EMS as well as Major Electrical & Mechanical System upgrades throughout the school. Remodeling of Group Restrooms and upgrade for ADA compliance. Design Completion Date: December 2018 Construction Completion Date: August 2022 Twin Lakes Elementary School Deferred Maintenance Project l Miami, FL Replacement of HVAC systems and Exterior windows in six (6) buildings, complete renovations of two (2) group restrooms to m eet ADA requirements, addition of missing lighted exit signs, playground remodeling and completely new HVAC system in Building 5 (Administration Building) including ductwork and exhaust fan. Three new electric panels, feeders and branch circuits were adde d as required to power new ac units and new exhaust fans for Group Restrooms. Design Completion Date: November 2014 Construction Completion Date: February 2015 MDCPS Lillie C Evans K-8 Center GOB Deferred Maintenance Project l Miami, FL - Performed Mechanical, Electrical and Plumbing engineering and design and managed/supervised Architect, Str uctural and Civil engineering for the addition of air conditioning system (20 tons) to existing Kitchen, covered walkway between two (2) existing buildings, passenger elevator and backflow preventer in main domestic water pipe. Roof replacement of two (2) buildings. - Remodeling of four (4) Group Restrooms and twelve (12) individual classroom toilet rooms and make them ADA compliant. Design Completion Date: November 2018 Construction Completion Date: September 2020 At&t Ojus CO 2nd Floor Remodeling Project l Miami, FL - Performed Mechanical, Electrical and Plumbing engineering /design and consulting services for the remodeling of the south half of the 2nd floor to accommodate a new training center. Remodeling included expansion of Women’s and Men’s Restrooms and upgrade for ADA compliance. - Design Completion Date: January 2020 Construction Completion Date: March 2022 At&t Hollywood Main Office 3rd Floor West Side Remodeling Project l Hollywood, FL - Performed Mechanical, Electrical and Plumbing engineering/design and consulting services for the remodeling of the west side of the 3rd floor to accommodate personnel move to this building. Remodeling included renovations of Women’s and Men’s Restrooms and upgrade for ADA compliance. - Design Completion Date: September 2019 Construction Completion Date: July 2021 50 The BetaJones Group/RFQ#26-07-01 Rutugandha “Rutu” H. Nulkar, P.E. Senior Geotechnical Engineer/QA/QC Review PROFESSIONAL EXPERIENCE Rutu has been practicing geotechnical engineering in South Florida for more than 21 years. She is the Operations Manager for Terracon’s West Palm Beach and Port St. Lucie offices. On a day - to-day basis, she provides technical oversight and direction to engineering and technical staff. Rutu’s geotechnical consulting capabilities include providing services for various types of projects, including buildings, roadways, bridges, and drilled shaft inspections. Rutu also has more than 20 years of experience in construction materials testing and verification, working on numerous Florida Department of Transportation (FDOT) projects and district-wide materials contracts. She has worked as an in-house geotechnical consultant with the District Materials Research Office (DMRO). PROJECT EXPERIENCE South Miami Heights Water Treatment Plant (WTP) Storage Building – Miami, FL Senior Engineer/Project Manager. The proposed construction project includes a 22 - to 25-foot high storage building to be located within 20900 SW 117th Avenue. Terracon conducted subsurface exploration (advancement of test borings and test pits), laboratory testing, and geotechnical engineering. Results of the field exploration and lab testing from the data report were used to provide recommendations concerning earthwork and the design and construction of foundations and floor slabs for the proposed project. State Road (SR) 90/Tamiami Trail/SW 8 Street from West of SW 4 Avenue to East of SW 2 Avenue – Miami, FL Senior Geotechnical Engineer. The project consists of utility improvements along the project corridor including the proposed construction of one stormwater well system for storm run-off in the proposed area. Provided subsurface exploration and geotechnical engineering services for the utility improvements project. Geotechnical engineering report included site location and exploration plans, boring logs with field and laboratory data, stratification based on visual soil (and rock) classification, groundwater levels observed during drilling, subsurface exploration procedures, description of subsurface conditions, exfiltration test results, geotechnical engineering recommendations for pipe backfill, and geotechnical foundation recommendations for the proposed pump station. Four Reasonable Assurance Reports (RARs) included current geologic conditions and recommendations for well depth casing that would be sufficient to restrict buoyancy from a class G-III aquifer into a Class G-II aquifer system. Rutu provided technical direction and supervision required for completion of Terracon’s services, and she provided senior-level review for the analysis and formulation of recommendations for the project. Southeast Stormwater Improvements – Dania Beach, FL Project Manager/Project Engineer. The project consists of stormwater drainage improvements within the area bound from west to the east by Federal Highway and SE 5th Avenue and from the south to the North from SE 10th Street to SE 2nd Street. An exfiltration trench and two pump stations were proposed for this project. Terracon performed subsurface exploration and geotechnical engineering services including the advancement of test borings, exfiltration tests, pavement cores, and double ring infiltrometer (DRI) tests. The purpose of Terracon’s service was to provide information and geotechnical engineering recommendations relative to: subsurface soil (and rock) conditions, groundwater conditions, pavement core information, exfiltration test results, and recommendations for the proposed pump stations. Rutu managed our staff and resources, field investigation, engineering analysis, calculations, and recommendations for the project. EDUCATION M.S., Civil Engineering, University of Florida, 2004 B.S., Civil Engineering, V.J.T.I. Matunga, Mumbai, India, 2001 REGISTRATIONS/ CERTIFICATIONS Registered Professional Engineer, Florida #70625 AFFILIATIONS American Society of Civil Engineers (ASCE) Florida Engineering Society (FES) Florida Engineering Society/Florida Institute of Consulting Engineers Leadership Institute YEARS OF EXPERIENCE With Terracon: 21 Total in Industry: 21 OFFICE LOCATION West Palm Beach, FL 51 The BetaJones Group/RFQ#26-07-01 Rutugandha “Rutu” H. Nulkar, P.E. (continued) Codrington Drive Roadway and Drainage Improvement – Lauderdale-By-The-Sea, FL Project Manager/Project Engineer. The planned project consisted of roadway and drainage improvements for 1,400 linear feet of Codrington Drive. This project was identified in the Town of Lauderdale-By-The-Sea’s 2020 Stormwater Master Plan Update as in need of drainage improvements to alleviate flooding. The planned drainage improvements include inlets and stormwater pipes. Replacement of an existing outfall pipe is also proposed with a larger steel pipe that will function with a future pump stati on proposed in the 20-year Capital Improvement Plan (CIP) to mitigate sea level rise impacts. The road is proposed to be resurfaced and regraded to facilitate drainage runoff to inlets. An attempt to address flooding in backyards is also planned. The roadway design incl uded speed humps and landscaping for traffic calming. Terracon performed subsurface exploration and geotechnical engineering services including the advancement of test borings and laboratory testing. The firm provided information and geotechnical engineering recommendations relative to subsurface soil conditions, groundwater conditions, site preparation and earthwork, as well as excavation, pipe bedding backfill/compaction. Terracon also conducted subsurface exploration and provided geotechnical recommendations concerning earthwork and the design and construction of a proposed outfall pipe that will be installed perpendicular to Codrington Drive. Rutu managed Terracon’s staff and resources, field investigation, engineering analysis, calculations, and recommendations for the project. 48-inch Diameter Water Main Downtown Loop Closure – Miami, FL Project Manager/Project Engineer. The 48-inch diameter water main will be constructed under railroad tracks and roadway at the Miami Loop, along NW 12th Street between NW 1st Avenue West and NW 1st Avenue East. Terracon provided geotechnical exploration services including drilling borings. The purpose of these services was to provide subsurface field exploration, laboratory testing information, and geotechnical engineering recommendations to assist in the design and construction of the water main. Rutu was responsible for Terracon’s staff and resources, field investigation, engineering analysis, calculations, and recommendations for the project. NW 84th Avenue Improvements from 58th Street to 74th Street – Miami, FL Project Manager/Project Engineer. The proposed improvements project includes roadway reconstruction, a proposed stormwater system of continuous interconnected exfiltration trench, utility relocations, sidewalks, curb and gutter, signage, mast arms, and signalization. Terracon performed subsurface exploration (borings and percolation tests) and geotechnical engineering services and provided information and geotechnical engineering recommendations relative to subsurface soil (and rock) conditions, groundwater conditions, and percolation test results. Rutu managed Terracon’s staff and resources, field investigation, engineering analysis, calculations, and recommendations for the project. Sunrise Pump Station No. 4 Bypass Pipe Replacement – Sunrise, FL Senior Engineer. Pump Station No. 4 provides flood protection for predominantly residential neighborhoods. Terracon provided construction materials testing services for the bypass pipe replacement. The scope of work included earthwork testing, concre te testing, onsite observations, laboratory testing, engineering and reporting services. Re-use Pipelines and Watermain Extensions – Davie, FL Project Manager/Engineer. The Town of Davie was upgrading its utility systems to allow for growth that was anticipated from t wo major redevelopment initiatives within the Town utility area. Terracon completed a program of subsurface exploration in connection with the re-use pipelines and water main extensions. The firm also provided engineering services during construction, on an as - needed basis, for the project including: laboratory moisture-density relationship tests for materials used for the utility trench backfill; limerock bearing ratio (LBR) and carbonate tests on the base course materials; in -place density testing on the utility trench backfill and base course materials; and corrosivity testing on in -situ soils disclosed during trenching on utility lines along Broward County roads. Seawall Evaluation at Pump Station 1 Facility, Miami-Dade Water and Sewer Department (WASD) – Miami, FL Project Engineer. WASD planned to renovate the seawall that existed at the time of Terracon’s services due to signs of deteri oration along the southeast edge. Pavement areas were also showing signs of heavy deterioration with holes found in the asphalt. Subsurface exploration, laboratory testing, and geotechnical engineering recommendations related to the design and construction of the seawall modifications were provided. The purpose of these services was to provide information and geotechnical engineering recommendations relative to subsurface and groundwater conditions, geotechnical engineering parameters for the design of the new seawall, construction considerations, and hydraulic conductivity of the existing soils. 52 The BetaJones Group/RFQ#26-07-01 Steven A. Harrison, P.G. Principal Geologist/QA/QC Review PROFESSIONAL EXPERIENCE Steven is a principal and a professional environmental consultant for Terracon and its Florida Division. He also serves as the Environmental Department Manager for the Fort Lauderdale and Miami offices. A licensed professional geologist and mold assessor, he specializes in providing responsive, cost-effective, technically accurate, and regulatory-focused solutions to meet clients’ project and operational requirements. Steven has 37 years of successful experience, continuously exceeding expectations by resolving environmental situations that clients face. Steven’s diverse environmental experience includes the assessment and remediation of impacted groundwater and soil, real estate transactional due diligence assessment (Phase I/II environmental site assessments (ESAs)), storage tank system management, industrial and Resource Conservation and Recovery Act (RCRA) waste disposal, wildlife surveys and compliance assistance with federal and State environmental regulations (SPCC Plans). PROJECT EXPERIENCE 54-inch Diameter Water Transmission Line Installation - Hialeah, FL Senior Geologist/QA/QC Review. The path of construction for the installation of the water main is located within the right-of-way (ROW) of W. 13th Street, extending from the John E. Preston Water Treatment Plant (WTP) at 1100 W. 2nd Avenue, east to W. 1st Avenue, where the path continues north to W. 29th Street, west to W. 4th Avenue, and north to approximately W. 53rd Street where it ends. The path of construction is approximately 3.2 miles in length. Terracon provided a Regulatory Database Review and Findings Report to identify potential areas of impact from regulated and/or hazardous substances that could be encountered during the installation of the 54 -inch diameter water main. Terracon completed Limited Site Investigation (LSI) activities in 2023 that were designed to assess for potential impacts that may have resulted from RECs and/or site concerns. The scope of work assessed for the presence of chemicals commonly associated with the 11 identified facilities of concern at concentrations above laboratory reporting limits in the soil and groundwater samples collected within the ROW (path of construction) adjacent to the facilities of concern. C-43 West Basin Storage Reservoir (WBSR) - Hendry County, FL Senior Geologist/QA/QC Reviewer. As part of the C -43 WBSR project, the South Florida Water Management District (SFWMD) required the clearing of vegetation and brush from three, non-contiguous former agriculture areas situated near or within the footprint of the future reservoir. The purpose of the effort, at the time of Terracon’s services, was to clear vegetation and expose surficial soils so that they could be accessed for removal and processing in a separate phase of work. Terracon contracted with Southwest Ag Service, Inc. (Southwest Ag) to provide the equipment and labor for the clearing activities. Terracon provided oversight and documented the progress of the clearing effort while continuously observing for the potential presence of threatened and endangered (T&E) faunal species in the work areas. Hammondville Road Right-of-way (ROW) - Pompano Beach, FL Project Manager. Responsible for oversight and direction of environmental work conducted in association with replacement of municipal sanitary sewer, stormwater and drinking piping within public ROW. Work required oversight of excavation efforts, screening, segregation, and staging of contaminated soil, and proper disposal of contaminated soil at licensed facility to accept contaminated soil. EDUCATION M.S., Marine Geology and Geophysics, Emphasis: Geo- Chemistry, Rosenstiel School of Marine and Atmospheric Sciences, University of Miami, 1988 B.S., Geology State University of New York Binghamton, 1980 – 1984 REGISTRATIONS Professional Geologist Florida, No. 0001390 Florida Licensed Mold Assessor, No. MRSA508 CERTIFICATIONS 8- Hr Hazmat Health and Safety Training Updates (Current) 40- Hr Hazmat Health and Safety Training (1989) Short Course: Assessing Environmental Risk in Property Transactions (1990) Short Course: How to Comply with Florida’s Haz Waste Regulations for Generators AFFILIATIONS Commercial Real Estate Women (CREW) Fort Lauderdale/Boca Raton YEARS OF EXPERIENCE With Terracon: 12 Total in Industry: 37 OFFICE LOCATION Fort Lauderdale, FL 53 The BetaJones Group/RFQ#26-07-01 Pump Station S-140 - Broward County, FL Project Manager. The project consisted of emergency response services to conduct source removal efforts within Pump Station S-140 to immediately address a release of diesel fuel from an emergency generator at the site. Terracon responded within 24 hours of notification to initiate the successful remediation of impacts to the soil and surface water of the site. The source removal efforts prevented the release from i mpacting groundwater quality within sensitive areas of the Everglades and the Seminole Reservation. Upon arrival at the site, Terracon collaborated with South Florida Water Management District (SFWMD) personnel to understand the location of the petroleum r elease and its path of migration. With a clear understanding of site conditions, Terracon’s team developed and immediately initiated source removal efforts to address affected areas while supporting ongoing operations. Source removal/emergency response eff orts addressed an area of approximately 1.5 acres. Upon completion of the source removal efforts, Terracon provided a source removal report (SRR) as documentation of the work. The SRR included site maps detailing the excavation and sample locations, analytical results of confirmation samples, and manifests from the disposal of impacted soil and free - floating product (FFP) impacted wastewater. Southport Turning Notch, Port Everglades – Broward County, FL Environmental Project Manager/APR/QA/QC Reviewer/Senior Geologist. The Southport Turning Notch project is one of the phases for the expansion of berth space and creation of five new berths in Southport by increasing the dimensions of the Turning Notch to accommodate larger cargo ships that will be available to Port Everglades with the expansion of the Panama Canal. This expansion will also create 16.5 acres of new mangrove habitat. For the Southport Turning Notch expansion, Terracon provided the first phas e of assessment of a former landfill within in active shipping container facility in advance of proposed construction; assessment included advancement of deep soil borings for lithologic interpretation and soil sample collection and analysis. An evaluation was conducted to assess levels of contamina tion to designate appropriate disposal and re-use facilities for approximately 3 million cubic yards (cy) of soil. Opa-Locka Airport Semi-Annual Groundwater Monitoring – Opa-Locka, FL APR/Quality Review. Terracon has conducted semi-annual groundwater monitoring at the Opa-Locka airport since 2017. Field activities were completed in general accordance with the FDEP’s guidance documents. Groundwater samples were collected for laboratory analysis. Replacement of 12" and 18" Force Main, NE 183 Street and Island Boulevard – Aventura, FL QA/QC Reviewer/Senior Geologist. Terracon supported the Miami -Dade Water and Sewer Department (WASD) with an emergency project to install 12” and 18” force mains along NE 183 Street and other areas in Aventura, Florida. Terracon conducted groundwater sampling within the ROW and within easements located within the Admiral’s Port Condominium and two active lift stations to address the potential for groundwater impacts due to the historical activities by a gas works facility. Terracon completed groundwater quality screening approximately every 100 feet including establishing Maintenance of Traffic (MOT) safety protocols for the protection of Terracon employees and the public. Through this expedited groundwater screening, Terracon was able to identify only a lim ited portion of groundwater impacts in the western portion of NE 183 Street, thereby facilitating the planned construction activities and addressing potential work exposure concerns. Florida Department of Environmental Protection (FDEP) Continuing Contract for Waste Cleanup Program - Various Locations Statewide Senior Geologist/QA/QC Reviewer. Terracon provides environmental engineering services to FDEP on an as-needed continuing contract basis. Services support facilities throughout Florida associated with the Waste Site Cleanup Section (WSCS), Site Investigation Section (SIS), Federal Programs Section (FPS), and Brownfields and CERCLA Site Screening (BF/CSS). The scope includes hazardous waste site cleanup; Drycleaning Solvent Cleanup Program services; hydrogeologic investigations to determine the extent and source of groundwater contamination; assessm ent and cleanup of state-owned lands; Brownfields assessments and source removals; technical review and support for assessment and remediation projects related to chemical or munitions use; CERCLA site assessments; technical support and operation and maintenance (O&M) of National Priorities List (Superfund) sites; investigation and remediation of contaminants of emerging concern; and institutional and engineering controls auditing (ICECAP). 54 The BetaJones Group/RFQ#26-07-01 Javier E. Jiménez, P.E. Senior Materials Engineer/QA/QC Review PROFESSIONAL EXPERIENCE Javier is a registered (Florida) professional engineer with more than 25 years of expertise in construction materials engineering, testing, and inspection services. He brings extensive experience in project management, structural engineering design, construction defect investigations, construction defect mitigation inspections, non - destructive testing of building envelope and structural components, forensic investigations, construction materials testing, and facilities engineering experience. Javier is a senior associate and the Operations Manager for Terracon’s Fort Lauderdale and Miami offices and laboratories. Javier serves as the senior materials engineer with direct technical responsibility for field inspection and construction materials testing, including laboratory testing services. He is responsible for evaluating and overseeing the construction of earthworks (embankments, levees, slopes), roadways and bridges; soil improvement/ replacement. On a day-to-day basis, he provides technical oversight and direction to engineering and technical staff, prepares study scope and fee proposal documents; report preparation; and is responsible for contract conformance (quality assurance/quality control [QA/QC]). Javier oversees and directs the construction services group, prepares proposals, conducts evaluations, provides field troubleshooting, and prepares project reports and invoices. His duties also include overseeing and maintaining quality control programs. PROJECT EXPERIENCE State Road (SR) 25/Okeechobee Road from East of NW 107 Avenue to East of NW 116 Way – Miami-Dade County, FL Construction Services Manager/Senior Materials Engineer. This FDOT project consists of building a grade separation (bridge) on SR 25/Okeechobee Road over NW 87 Avenue, building flyover ramps to and from SR 25/Okeechobee Road and NW 87 Avenue, reconstructing NW 87 Avenue from south of SR 25/ Okeechobee Road to north of NW 103 Street Realigning NW 103 Street, sidewalk construction, reconstructing NW South River Drive, removing the existing bridge at NW 105 Way and building a new low - level bridge at NW 106 Str eet, widening of NW 106 Street, and construction of Control Structure G-72E. Terracon is responsible for performing QC testing and inspection services for the general contractor. CTQP-certified technicians perform field sampling and testing, and Terracon conducts laboratory services for soils and concrete on this project. The firm’s QC Manager or his representative supervises and schedules Terracon personnel, reviews density log book entries made by Terracon, logs samples into the MAC reporting system, ensures construction compliance with the specifications and plans documents and prepares monthly invoices and quantities for the job guide schedule. Miami Midtown IV – Miami, FL Construction Services Manager. The project consisted of the construction of a 31 -story mixed-use structure with a total approximate area of 499,744 square feet as well as a 40-story mixed-use facility that includes mercantile, hotel, condominiums and parking garage with a total approximate area of 760,229 square feet. Mr Jimenez managed the team that provided Construction Materials Testing and Threshold Inspection Services. EDUCATION Master of Business Administration, Nova Southeastern University, Davie, FL Master of Science in Civil Engineering, University of Michigan, Ann Arbor, MI Bachelor of Civil Engineering, Georgia Institute of Technology, Atlanta, GA REGISTRATIONS Registered Professional Engineer: Florida No. 62162 Registered Professional Engineer Puerto Rico No. 16347 CERTIFICATIONS LEED AP AFFILIATIONS American Society of Civil Engineers American Welding Society Latin Builders Association YEARS OF EXPERIENCE With Terracon: 4 Total in Industry: 28 OFFICE LOCATION Miami, FL and Fort Lauderdale, FL 55 The BetaJones Group/RFQ#26-07-01 Florida Department of Transportation (FDOT) Districts 4 and 6 (D4/6) Districtwide Materials Lab Material Testing and Construction Support - Various Locations Districtwide Construction Services Manager/Senior Materials Engineer. Provide technical support as needed by the FDOT. Our services include but are not limited to asphalt plant inspections for Verification and Independent Verification (IV); performing laboratory testing services in accordance with all applicable standards; delivering samples to resolution laboratories upon Project Administrator (PA) request; notify PA’s and the Department Project Manager (PM) in case of failing materials; provide sampling, testing and r eporting on concrete materials ensuring compliance with Standard Operating Procedures (SOP) and applicable contract documents; inspecting and reporting on Pre -Stress/Pre-Cast Production Facilities to guarantee that all materials used on FDOT projects meet the requirements of governing documents and approved QC Program; perform structural concrete evaluation as requested and report any noted deficiencies to the District Structural Materials Engineer; and inspect, sample, test and report on field earthwork ac tivities and other assignments requested by the FDOT. South Corridor Rapid Transit Parking Garage – Miami, FL Construction Services Manager/Senior Materials Engineer. This project includes the design and construction of a 6 -story parking garage with associated site improvement. Terracon provides materials testing services for the project. Terracon’s scope of work in the field includes verification for compliance with contract documents of the items incorporated into the project limited to operations related to earthwork, concrete, and grout. For issues related to the project, the Project Manager is responsible for preparing and submitting invoices according to established deadlines, communicating with the client frequently to make sure services are being provided in a satisfactory manner, being aware of upcoming work to ensure the availability of technical personnel to cover each upcoming assignment, and guaranteeing that deliverables are being provided to the client by established closing dates. A P.E. is responsible for reviewing and approving these deliverables prior to sharing with the client. Field and laborator y reports are distributed in real-time. I-95 Express Lanes, Phase 3B-2, Florida Department of Transportation (FDOT) District 4 (D4) - Palm Beach County, FL Senior Materials Engineer. I-95 Express Lanes, Phase 3B-2 will extend the Express Lanes north from slightly south of Glades Road to south of Linton Boulevard. The improvements generally consist of converting the existing High Occupancy Vehicle (HOV) lanes to High Occupancy Toll (HOT) lanes and widening that will result in two tolled lanes in each direction. The number of existing general use and auxiliary lanes will remain the same. Access to the Express Lanes will be limited to designated ingress and egress locations. Other improvements consist of milling, resurfacing, and overbuilding of the I-95 general use lanes, roadway widening, drainage, mast arms for signalization, one bridge replacement and two bridge widenings, temporary and permanent retaining walls, sound barrier walls, overhead sign structures, tolling gantries, and associated infrastructure, and Intelligent Transportation System (ITS). Terracon is responsible for providing construction materials engineering, testing, inspections, and Contractor Quality Control (CQC) services for the Contractor. As a member of the design/build (D/B) team, Terracon has performed the following geotechnical engineering services: soil exploration, soil classification, laboratory testing, and standard foundation studies. Terracon is also providing post-design geotechnical services including pile driving analysis (PDA), and drilled shaft and auger cast pile inspections. State Road (SR) 836 New Homestead Extension of Florida’s Turnpike (HEFT) Ramp Connections – Miami-Dade County, FL Contract Manager/Senior Materials Engineer. Construction materials testing subconsultant providing field and laboratory testing services for the GEC firm for GMX. The D/B project will improve access to the commercial, industrial, and residential areas west of Florida’s Turnpike. The four new ramps will provide connection between SR 836 and the HEFT, facilitating travel between the southwest and northwest areas of Miami -Dade County, access to the Doral area, and access to transit facilities in the area. 56 The BetaJones Group/RFQ#26-07-01 Leading the Longitude team is Eduardo “Eddie” M. Suarez, PSM. Recognized for his exceptional leadership, technical proficiency, and commitment to delivering top-tier surveying services, he has successfully navigated complex projects in diverse sectors, including commercial, residential, transportation and infrastructure developments. Having established a reputation for quality, integrity, and client satisfaction, Eddie has built and nurtured strong professional relationships. His collaborative approach ensures seamless coordination between multidisciplinary teams, driving projects toward successful outcomes. With a keen eye for detail and a passion for precision, he orchestrates the team’s efforts with unwavering dedication. Sunny Isles Beach Goverment Center - 18070 Collins Avenue Longitude Surveyors performed an as-built survey of the paved areas and surrounding site improvements. Services included locating elevations of fountain features and utilities, tiled walls, over hangs, columns, curbs, stairwells, entryways, raised planter platforms, existing fences, and other visibleimprovements. All elevations were referenced to the NGVD 1929 vertical datum. Government Center Pedestrian Bridge Longitude Surveyors performed a topographic survey to establish the existing rights-of-way and property lines within the project limits. Services included locating significant above-ground improvements, collecting elevation data on a 10-foot grid, documenting existing drainage infrastructure and utility information, and establishing survey control points and temporary benchmarks to support the project design. Sunny Isles Water Main Improvements - NE 183 Street; North Bay Road; Atlantic Boulevard; NE 178 Street; NE 181 Drive; NE 178 Drive; NE 180 Drive; and Atlantic Isle Longitude Surveyors performed a topographic survey and right-of-way analysis to support the project design. Services included establishing horizontal and vertical control, documenting above-ground improvements, collecting elevation data for a Digital Terrain Model (DTM), and locating existing drainage and sanitary infrastructure. We also performed utility designation using Ground Penetrating Radar (GPR) and electromagnetic locating equipment, followed by Quality Level “A” (QLA) Subsurface Utility Engineering (SUE) services at eighteen (18) locations to verify the horizontal and vertical position, size, material, and direction of underground utilities. Samson Park 17451 & 17425 Collins Avenue Longitude Surveyors updated the existing survey in accordance with FDEP standards using the NAVD 1988 vertical datum. The survey included the exhibit area, Mean High Water Line (MHWL), Coastal Construction Control Line (CCCL), Erosion Control Line (ECL), bulkhead line, edge of water, seasonal high water line, and the 0.0-foot elevation contour. EDUARDO M. SUAREZ, PSM Chief Surveyor / Principal AVAILABILITY 60% INDUSTRY TENURE 41 years LONGITUDE TENURE 22 years EDUCATION AA, Miami Dade College (1993) REGISTRATIONS Professional Surveyor and Mapper FL License No. LS6313 AFFILIATIONS Florida Surveying and Mapping Society Miami Chapter President America Society of Civil Engineers Member Utility Engineering Surveying Institute Member Page 1 of 157The BetaJones Group/RFQ#26-07-01 Greg Bouie, PSM, is a professional surveyor with 19 years of experience in the surveying and mapping field. He began his career in Dallas, Georgia, focusing on subdivision design and large boundary surveying projects around the Metropolitan Atlanta area. Greg started as an instrument person while studying surveying and mapping at Southern Polytechnic State University, gaining valuable field experience alongside his education in survey theory. Over the years, he has worked with well-known firms on a variety of projects, steadily growing his expertise. In 2018, Greg became a licensed surveyor in Florida, marking a key milestone in his career. In 2024, he joined the Longitude Surveyors team, where he leads our Broward Office and continues to contribute to the industry while excelling in his profession. Water Main Replacement along Holiday DR, City of Hallandale Beach, Hallandale Beach, FL As Project Manager, Greg Bouie, PSM directed topographic, bathymetric, and SUE services, overseeing project coordination, quality control, and the delivery of accurate survey data and mapping. City of North Lauderdale - RRR at 71st AVE from McNab to Southgate, North Lauderdale, FL Greg Bouie, PSM led the planning and execution of the aerial photogrammetry As Project Manager, Greg Bouie, PSM directed the topographic survey, UAV mapping, and right-of-way analysis, overseeing project coordination, quality assurance, and final deliverables. Broward County - Project Design Services of Adaptive Traffic Control Systems and Fiber Optic Network - #PNC2127558P1 As Project Manager, Greg Bouie, PSM led the aerial photogrammetry survey, overseeing UAV data collection, project coordination, quality control, and final deliverables. Surveying and Mapping Services for the multiple segments of roadways adjacent to several schools within Coconut Creek, FL As Project Manager, Greg Bouie, PSM directed the planimetric survey, overseeing field operations, quality control, and the delivery of accurate mapping and survey data. City of Sunrise - NW 44th Street Improvements, Sunrise, FL As Project Manager, Greg Bouie, PSM directed topographic surveying and SUE services, overseeing project coordination, quality control, utility verification, and final deliverables. City of Oakland Park - Prospect Road Right-of-Way, Oakland Park, FL As Project Manager, Greg Bouie, PSM directed the topographic survey, overseeing field coordination, quality control, survey control, and the delivery of accurate survey data. GREG BOUIE, PSM Project Manager AVAILABILITY 75% INDUSTRY TENURE 19 years LONGITUDE TENURE 2 years EDUCATION BS, History Florida Int’l University (2005) Surveying and Mapping Certificate Southern Polytechnic State University (2008) REGISTRATIONS Professional Surveyor and Mapper FL License No. LS7169 AFFILIATIONS Florida Surveying and Mapping Society Member Page 1 of 158The BetaJones Group/RFQ#26-07-01 Joseph Edwards, PE, CST is a Survey Technician with Longitude Surveyors who recently earned his Professional Engineer license, bringing additional value and perspective to the firm. With over 11 years of experience in the civil engineering industry, Joseph has specialized in paving and grading design, stormwater drainage systems, water and sewer pipelines, and pavement infrastructure. His background in engineering, combined with his surveying and geomatics experience, strengthens Longitude’s ability to approach projects with a comprehensive understanding of both design and field perspectives. Joseph’s unique qualifications make him a great asset to Longitude Surveyors, enhancing the quality and precision of the services delivered to clients. RRR at 71st AVE from McNab to Southgate , City of North Lauderdale, North Lauderdale, FL Joseph Edwards supported the aerial photogrammetry survey by assisting with drone data processing, CAD drafting, and the preparation of accurate mapping deliverables, including rights-of-way, property and ownership lines, pavement markings, signage, curbs, gutters, medians, drainage structures, utility features, and other visible improvements for the Southwest 71 Avenue corridor using data collected with a DJI Matrice 300 RTK drone to support project planning and design. Signal Upgrades at SR-806/Atlantic Avenue at SR-809/Military Trail and SR- 809/Military Trail at Belvedere Road: Contract: CAQ79 / Construction Project FPID: 447944-1-32-01 Joseph Edwards, PE, SIT, provided surveying and CAD support by processing topographic and SUE data and preparing accurate survey drawings, utility mapping, and project deliverables for design and construction. Landside and Airside areas for the MIA South Terminal Expansion, 2100 NW 20 St. Miami International Airport Perimeter Fence Hardening Miami-Dade Aviation Department, Miami, FL Joseph Edwards supported Quality Level B (QL-B) Subsurface Utility Engineering (SUE) services by processing utility data, preparing CAD deliverables, and incorporating designated underground utilities into accurate survey documents to support utility conflict analysis and project design. North District Wastewater Treatment Plant - Electrical Distribution Building No. 2, Miami-Dade Water and Sewer, Miami, FL Joseph Edwards provided surveying and CAD support by processing field data, preparing survey drawings, and accurately documenting boring hole locations, coordinates, elevations, and easement exhibits for project planning. City of Ft. Lauderdale Fire Station No. 88 , Ft. Lauderdale, FL Joseph Edwards provided surveying and CAD support by processing topographic and SUE data, preparing survey drawings, and incorporating utility, control, and elevation information into accurate deliverables for project planning, design, and construction. Joseph Daniel Edwards, PE, CST Assistant Project Manager / UAS Drone Pilot AVAILABILITY 85% INDUSTRY TENURE 11 years LONGITUDE TENURE 1 year EDUCATION University of Florida Undergraduate Certificate in Geomatics (Surveying) (2023) BS, Civil Engineering Florida International University (2012) MS, Engineering Management with Structural/Wind/ Construction Florida International University (2014) REGISTRATIONS Professional Engineer FL PE License: PE101165 CST Certificate No: 1225-9578 Page 1 of 159The BetaJones Group/RFQ#26-07-01 T TAB 4 APPROACH/ METHODOLOGY 801 Brickell Avenue ∙ Suite 800 ∙ Miami, Florida 33131 August 11, 2026 THE BETAJONES GROUP – APPROACH / METHODOLOGY CITY OF SUNNY ISLES BEACH RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) A successful project starts in the preliminary planning stage. BetaJones Engineers bring the experience to know, and/or find out immediately, the entire development process and break it down to each individual task and hours that the project will most likely take. Additionally, BetaJones Engineers will be able to identify project unknowns or potential paths by detailed research and coordination at the very beginning of the project, to keep the client posted with any potential obstacles and minimize any surprises. The BetaJones Group offices are within 20 minutes traveling time to the City of Sunny Isles Beach and plans to be efficient in deciding whether a meeting or phone conference needs to take place but will NEVER sacrifice the quality of the project by doing so. The BetaJones pledges to meet with the city, AS NECESSARY, to complete the project on time and with the utmost quality. We are also willing to have permanent staff in the City Hall or nearby if required or deemed required for a quality outcome to the assigned project(s) responsibility. With years of professional experience working throughout the entire State of Florida, including related professional specialties applicable to Continuing Service Municipal projects throughout Broward County and Miami-Dade County, permitted through the Florida Department of Environmental Protection, FDEP, FDOT, SFWMD, and other respective Agencies and Municipalities, our Civil Engineering Licensed Professional Engineers, and Staff bring solid and proven experience applicable to Municipal Engineering Utility Improvement Solutions. Below is a GENERAL APPROACH to successfully bring A Generic Municipal Project from Conceptual Stage to Construction. The General Project Approach shows Design Team as well as Municipal Staff Support Anticipated for this Project: 1. FEASIBLITY STUDY - SITE RESEARCH AND INVESTIGATION o Design Team will coordinate with the City Management Team and review As-Built Plans of Site, Underground Utilities and Adjacent Structures. o Design Team will review Building Code, Zoning, Engineering, and landscape regulations to identify required code and any possible obstacles. o Design Team will conduct a full site visit to study and perform the walkthrough portion of the Study to identify and measure any Compliance Issues. 2. TOPOGRAHICAL AND LOCATION SURVEYS o Surveyor shall conduct the necessary surveys (Location, Tree, Topographical) in order to prepare a base background for the Design Drawings and to identify existing longitudinal and cross slopes throughout the project. 3. GEOTECHNICAL ENGINEERING STUDY o Geotechnical Engineer shall conduct the necessary Soils Studies to identify and recommend Pavement and Utility Parameters. 4. FEASIBLITY REPORT COMPLETION, PRESENTATION AND DESIGN OUTLOOK WITH OWNERS o Design Team will complete Study and prepare a presentation of Improvement requirements and optional recommendations to the Client. 60 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 2 of 5 8/11/2026 o Design team to discuss with client if sections will close or remain open during improvements in order to implement construction phases and areas to remain open for onsite animals. o Design Team will present a estimated design and permit schedule 5. OPINION OF PROBABLE CONSTRUCTION COST - CONCEPTUAL o At this stage of the project, the Design Team will provide an opinion of probable cost to the Client based on the conceptual outlook of the project. 6. ENGINEERING SCHEMATIC DESIGN (50%) a. Project Manager and Senior Civil Engineer of Record, Mr. Luis A. Betalleluz, P.E. will focus on all Layout, Pipeline and Roadway Rehabilitation Improvement Design, Paving and Grading Design as well as Preparation of all Related Construction Plans for submittal and approval with Ownership as well as all required jurisdictional agencies. o Coordination with City Staff, Council and Advisory Boards will occur during this process. 7. OPINION OF PROBABLE CONSTRUCTION COST – SCHEMATIC DESIGN o At this stage of the project, the Design Team will provide an opinion of probable cost to the Client based on the Schematic Design of the project. 8. ENGINEERING DESIGN DEVELOPMENT (90%) o Design team will provide more detailed Engineering Design Plans. o Coordination with City Staff, Council and Advisory Boards will occur during this process. 9. OPINION OF PROBABLE CONSTRUCTION COST – DESIGN DEVELOPMENT o At this stage of the project, the Design Team will provide an opinion of probable cost to the Client based on the 90% Design Development Plans of the project. 10. ENGINEERING CONSTRUCTION DOCUMENTS (100%) o Design team will finalize Engineering Design Plans to Prepare for Final Permitting Process o A Final Cost Estimate will be prepared for the Client o A Project Specifications Manual will be prepared for the Client 11. CONSTRUCTION COST ESTIMATE o The Design Team will provide a cost estimate to the Client based on 100% Construction Documents of the project. 12. PERMITTING PROCESS o Project Manager Mr. Luis A. Betalleluz and Team will deliver and work with all Jurisdictional Agencies to obtain all necessary sub-permits and final Building Construction Permit as required to be able to proceed to the Construction Process. 13. BIDDING PROCESS o The Design Team will Prepare and/or assist the client in preparing a bid package as required to obtain bids from qualified Contractors. o The Design Team will conduct and/or be part of the pre-bid meetings to answer all contractor’s questions and or clarifications. o The Design Team will also assist the client in reviewing the Contractor’s proposals follow up with references and provide a written summary and/or oral presentation of their findings to assist the Client in selecting the Contractor. 61 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 3 of 5 8/11/2026 14.CONSTRUCTION PROCESS, PROJECT CLOSEOUT, & FINAL PROJECT CERTIFICATION o Once the Construction Team is selected, the Design Team will hold a Pre-Construction Meeting with the Client and Construction Team to discuss Client Goals and Construction Procedures specifically of importance to the Client such as: Traffic and Pedestrian Flow Operations, Construction Team Staging, MOT, Noise and Dust Control, Construction Schedule, Equipment Storage, Security, etc. o The Architect and Engineers of Record shall review and approve payment schedules prior to the Client releasing payments to the Contractor o The Design Team will work with the Client and Construction Team and attend Pre- Construction Meetings, as necessary, with Jurisdictional Agencies and Inspectors requiring such meetings. o The Design Team will review and process, as necessary, all construction shop drawings and Contractor RFIs (Request for Additional Information) for materials to be ordered, accordingly, and any clarifications questions answered. o Any Finishes on the project still left to be determined will be coordinated between the Client, Design and Construction Teams. o The Design Team Shall conduct onsite inspections, review testing, and maintain coordination with the Contractor on all As-built Requirements to be reviewed and approved prior to certification. o The Design Team shall assist the Contractor with the Permit Close-out with the required Jurisdictional Agencies. o At the End of Construction, the Design team will conduct a final review of the Asbuilt Survey and Site Work and provide a checklist in coordination with the Client to the Contractor of any remaining close out items. o Once the Permit has been closed and final Punch list items have been completed, the Project Manager will provide all certification letters and obtain and releases from the Contractor for the owners to proceed with operating the newly built project. SCHEDULE CONTROL, COST CONTROL, AND QUALITY CONTROL The BetaJones Group, Inc. team’s philosophy “level of technical excellence, practical experience and client responsiveness” includes the following 3 key Tasks in every project: 1.SCHEDULE CONTROL o Large Projects such Everglades Restoration Project, Tropical Memorial Park Track and Field Stadium, West (End) Kendall District Regional Park, Miami-Dade Transit, and All Miami Dade Aviation Airport Projects were successfully completed via a Controlled Schedule done in professional Scheduling Software. An analysis of the Critical Path Method and Tight Contract Control along with Agency Follow Ups allowed for these projects to be finalized within the Project Time Period. 2.COST CONTROL o Many of our Large Projects such as Tropical Memorial Park Track and Field Stadium, West (End) Kendall District Regional Park, Miami-Dade Transit, and All Miami Dade Aviation Airport Projects were successfully completed on budget by providing Cost Estimates throughout the Design Process, along with Value Engineering and Constant Coordination with the Client. This allowed all of our projects to come be completed within the full Project’s budget and allowed our clients to save thousands of dollars and in some cases, hundreds of thousands of dollars in construction costs. 62 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 4 of 5 8/11/2026 3. QUALITY CONTROL o The BetaJones Group does not release any internal design until at least two experienced engineers have reviewed Design and Design Calculations. This allows the quality of our product to always be solid and presentable. PROJECT COORDINATION A Successful Municipal Project requires technical professionals that can communicate at all levels of the project. From presenting project scope and schedules in neighborhood meetings, to technical presenting system designs to the corresponding engineering reviewers, to presenting the project to the Commission, Board, and / or City Engineer, The BetaJones Group would be the representative arm of the City and within the limits that the City would delegate. We would maintain constant communication with the City and the necessary officials, as coordinated throughout the project to successfully complete any given project. Any complaints brought to the attention of our team would be analyzed and determine what the best resolution would be. Simultaneously we would notify the City’s Project Manager and present them with all necessary information from the complaint to our approach in resolving the matter, where the City would make the final decision on how to handle any issue, expeditiously and successfully. PROJECT MANAGER EXPERIENCE, TECHNICAL QUALIFICATIONS AND EXPERTISE • Mr. Luis A. Betalleluz, Licensed Professional Engineer is the Project Manager and Lead Civil Engineer of Record on this Project. With over 20 years of professional experience working throughout the entire state Florida, including some of related professional specialties applicable to this project: Municipal Projects and Large-Scale Utility Rehabilitation, Watermain Rehabilitations and Watermain Extensions (Project Manager and / or Civil Engineer of Record), This List make him an expert in Project Management and engineering design for each specific aspect that is needed for this project. • Amongst the Types of Projects Specifically Related to similar geographic and other possible Municipal Projects (Listed in his Resume Section) Scope include: o Broward County School –Major Watermain Rehabilitation and Waterline Upgrade Projects in 4 Public Schools from a Range of 1,000 LF to 10,000LF around the entire school campus in order to provide sufficient Fire Flow and Pressure to all school buildings providing fire protection to old buildings previously without fire sprinkler systems. o Miami Beach Bay Road Drainage Improvements (Including Deep Injection Well System) – Roadway Drainage Project providing drainage improvements to Bay Road which covers approximately 8 City Blocks of Right-of-Way Pressurized drainage system along with a large pump station. o City of Hollywood’s Design-Build I-95 Pump Station Project – This took into account complex drainage modeling and over 2.5 miles of pressurized drainage pipe line improvements and a pump station building. Mr. Betalleluz was heavily involved with the Cost Estimates, Take- Offs, and Construction oversight of this project which provided over 30 square miles of drainage relief in South Brorward and North Dade County o Starwoods Tribute/Element Luxury Hotel in Ft. Lauderdale which required a 1,000 LF 8” watermain extension across a large length of NE 3rd Street up to North Federal Highway, an FDOT Road. o Miami-Dade County Transit Busway Improvements (over 12 Cities including North Miami Beach) o Miami – Dade County Youth Fair SSES Sewer Certification – Study, Rehabilitation and Certification of over 5 miles of gravity and pressurized sanitary sewer system serving this 88 Acre park facility. 63 The BetaJones Group/RFQ#26-07-01 THE BETAJONES GROUP, INC. EXPEDITING DEVELOPMENT Page 5 of 5 8/11/2026 o Grove Isle Sewer SSES Sewer Certification – Study, Rehabilitation and Certification of over 3 miles of gravity and pressurized sanitary sewer system serving a private island with a residential and hotel complex.. • Over 20 Fully LEED Certified Projects including High End Hotels, Government Buildings, and Parks. (See Resume Description for All LEED Certified Projects.) • Additionally, over 50% of projects that Mr. Betalleluz has been involved throughout his career have had Architects, Landscape Architects, Surveyors, MEPs, Structural Engineers and Other Design Professionals, showing a proven track record in coordinating with a Design Team and the Client for successful completions of projects. • Mr. Betalleluz has worked with Florida Fish and Wildlife in a 2,800 Acre Drainage Preservation Study, In Puerto Rico with the USCAE in a Mangrove Habitat Restoration Project, as well as the City of Miami Beach and City of Gainesville, FL in Historic Building Restoration and/or Preservation Projects. • Mr. Betalleluz himself had his collegiate education at the University of Florida Top Engineering School in the State and 35-year Resident throughout the Entire State of Florida and practicing engineering experience throughout the state of Florida in similar or identical projects brings him experience in design and jurisdictional knowledge. • Some of Mr. Betalleluz’s designs also have won national awards, Project of the Year Nominations, amongst many years of design experience (Tropical Park Track and Field Stadium). 64 The BetaJones Group/RFQ#26-07-01 . TAB 5 REFERENCES 65 The BetaJones Group/RFQ#26-07-01 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Phone: ____________________________________________ Email: ___________________________________________ 1. Q: Rate the firm’s success in providing their services as it relates to the project. A: 2. Q:Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: 3. Q: Would you use them again? A: 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: 5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: 6. Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ __________________________________________________________________________________________________________ __________________________________________________________________________________________________________________________________________________________________________________________________________ The BetaJones Group, Inc 305-825-0617 myarchitect@keithmartinarchitect.com Keith Martin Project Manager/Prime Consultant KMA, Inc 8/6/2026 KMA, Inc - (MDCPS) ADA Merritt and South Miami Middle School Excellent Excellent Yes Yes Timely and Quality Deliverables. Knowledgeable, Dependable, Pragmatic and Highly Professional staff/firm. 66 The BetaJones Group/RFQ#26-07-01 67 The BetaJones Group/RFQ#26-07-01 T TAB 6 CONTRACT FORMS RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 36 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net DELIVER TO: City of Sunny Isles Beach DemandStar.com REQUEST FOR QUALIFICATIONS SECTION 6 BID SUBMITTAL FORMS OPENING: 11:00 A.M. 8/4/2026 PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CITY OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be less all taxes. Tax Exemption Certificate furnished upon request. Issued by: Procurement Department Date Issued: 7/7/2026 This Bid Submittal Consists of Pages 36-43 Sealed bids are subject to the Terms and Conditions of this Request for Proposal and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ # 26-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES FOR ARCHITECTURAL AND ENGINEERING SERVICES (CCNA) Proposer Name: ________________________________________ Commodity Code(s): SUBMIT YOUR PROPOSAL ON DEMANDSTAR.COM FAILURE TO SIGN PAGE 35 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON-RESPONSIVE 68 The BetaJones Group/RFQ#26-07-01 69 The BetaJones Group/RFQ#26-07-01 6.3 ACKNOWLEDGEMENT FORM - REVISED ADDENDUM 5 NAME OF COMPANY: ___________________________________________ (Name of Proposer Submitting RFQ) CHECK DISCIPLINES YOU ARE APPLYING FOR: 1-ARCHITECTS ____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: MECHANICAL, HVAC & PLUMBING ENGINEERS___ b.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: STRUCTURAL ENGINEERING SERVICES ___ 2-LANDSCAPE ARCHITECTS____ 3-GENERAL CIVIL ENGINEERS____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: MECHANICAL, HVAC & PLUMBING ENGINEERS___ b.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: STRUCTURAL ENGINEERING SERVICES ___ c.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT OR IN-HOUSE STAFF FOR SURVEYORS AND MAPPING___ d.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT OR IN-HOUSE STAFF FOR: GEOTECHNICAL SERVICES___ 4-ELECTRICAL ENGINEERS___ 5-SURVEYORS AND MAPPING____ 6-ENVIRONMENTAL / COASTAL ENGINEERING____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: GEOTECHNICAL 70 The BetaJones Group/RFQ#26-07-01 SERVICES ___ 7- TRANSPORTATION / TRANSIT / TRAFFIC ENGINEERING____ 8- CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____ 71 The BetaJones Group/RFQ#26-07-01 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 39 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net QUESTIONNAIRE MUST BE INCLUDED WITH FIRM’S PROPOSAL Proposer must list projects of similar project scope fulfilling the following qualification requests: 1. List Project Management Personnel. Personnel cannot be changed without written approval. Assigned Project Manager: 1.2 Principal-in-Charge: 2. How many years has your organization been in business as a Consultant? 3. List current workload. 4. Is the Proposer subcontracting any part of this work? If so, give details to major key sub- Consultant’s name, address, phone number and type of work to be performed. Also, indicate the percentage of the total work to be performed by the sub-Consultant. 5. The business is a (sole proprietorship) (partnership) (corporation) and name of owner: 72 The BetaJones Group/RFQ#26-07-01 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 40 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net 6. Has your company ever been debarred or terminated for default on a government contract? 7. Proposer must list any exceptions taken to the terms and condition in this RFQ. 8. Describe the Proposer’s attributes, which make the Proposer best-suited for this project. 9. Proposer is a Certified Minority Business: Yes _______ No_______ 10. Specify address of Proposer’s designated office where the majority of work on projects will be performed: 11. Consultant’s volume of work performed for the City of Sunny Isles Beach as a consultant and as a sub-consultant – currently and previously. END OF SECTION 73 The BetaJones Group/RFQ#26-07-01 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 42 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net BID SUBMITTAL FORM RFQ # 26-07-01 CONTINUING ARCHITECTURAL AND ENGINEERING SERVICES The undersigned Proposer proposes and agrees, if this Bid is accepted, to enter into a Contract with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposer accepts all of the terms and conditions of the Advertisement or Request for Qualifications and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposer agrees to sign and submit the Contract and other documents required by the Bidding Requirements within ten days after the date of the City’s Notice of Award via Commission approval. In submitting this Bid, the Proposer represents, as more fully set forth in the Contract, that: ▪ The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. ▪ The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. ▪ This Proposal is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advant age over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the Notice to Proceed. Proposer Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________Fax No. _________________________ Email Address: _______________________________FEIN No. __/__-__/__/__/__/__/__/__ 74 The BetaJones Group/RFQ#26-07-01 grees to off Terms Print Title: Principal THE EXECUTION OF THIS FORM CONST ITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY T HE T ERMS OF ITS PROPOSAL FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE . THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION , ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 43 75 The BetaJones Group/RFQ#26-07-01 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 45 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net AFFIDAVITS 76 The BetaJones Group/RFQ#26-07-01 Affidavit of Compliance with Anti-Human Trafficking Laws Ctty of Sunny Isles Beach 18070 Collms Avenue Sunny Isles Beac/1 , FL 33160 Telephone · (305) 947-0606 The undersigned , on behalf of the entity listed below ("Entity "), hereby attests, under penalty of perjury , as follows : 1 . Entity does not use coercion for labor or services as defined in Section 787 .06 , Florida Statutes. (Source: § 787 .06 (13), Florida Statutes-Human Traffick ing ). 2 . The undersigned is authorized to execute this affidavit Date : July 14th 2o26 '- Entity : The BetaJones Group , Inc STATE OF FLORIDA COUNTY OF MIAMI-DADE ntity. The foregoing instrument was acknowledged before me, by means of II physical presence or 0 online notarization , this 14th day of July 20~. by Luis A. Betalleluz as Principal for The BetaJones Group , Inc , who is personally known to me or who has produced-----------as identification . Notary Publ ic Signature :~ State of Florida at Large (Seal ) Print Name: Michelle C . Lo pez My commission expires: 1/15/2027 77 The BetaJones Group/RFQ#26-07-01 STATE OF FLORIDA NON -COLLUS I ON AFFIDAVIT City of Sunny Isle s Beach 18070 Collins Avenue Sunny Isles Beach , FL 33160 Telephone: (305) 947-0606 Fax : (305) 949-3113 COUNTY OF MIAMI-D ADE ) The undersign ed being first duly sworn as provided by law , deposes, and says : This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach Ci ty Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid . The undersigned is authorized to make this Affidavit on behalf of, The BetaJones Group , Inc (Name of Corporation , Partnership , Individual, etc.) S Corporation Florida a ,----:=----:-:::--.,....----,------' formed under the laws of ___ -:-=-,-,--:- (Type of Business) (State) of which he is __ P_r_i n_c_i_p_a_I_---:-=-:--:::----:=-----=--=-:---:----:- (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person , firm , or corporation named in above Paragraph 1 0.2, nor anyone else to the knowledge of the undersigned , have themselves solicited or employed anyone else to solicit fa vorable action for this Bid by the City , also that no head of any department or employee therein , or any officer of the City of Sunny Isles Beach , Florida is directly interested there in . This Bid is genuine and not collusive or a sham ; the person , firm or corpora tion named above in Paragraph 10.2 has not colluded , conspired , connived or agreed directly or indirectly with any proposers or person , firm or corpora tion, to put in a sham Bid , or that such person , firm or corporation, shall refrain from Bidding , and has not in any manner, directly or indire ctly , sought by agreement or collusion , or communication or conference with any person , firm or corporation , to fix the prices of said Bid or Bids of any other proposers ; and all statements contained in the Bid or Bids described above true ; and further; neither the undersigned , nor the person , firm or corporation named above in Paragraph 10.2 , has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relat ive thereto , to any association or to any member or agent thereof. Luis A . Betalleluz Principal AFFIANT'S NAME AFFIANT'S TITLE TAKEN , SWORN AND SUBSCRIBED TO BEFORE ME th is 14 th day of __ J_u_ly ______ , 20 26 Personally Known __ X __ or Produced Identification ___ _ Type of identifica tion--------------- (Affix seal here) DECEMBER 28 , 2010 MICHELlE LOPEZ Notary Public State of Florida Comm• HH33434 7 Expires 1/15/2027 Michelle C. Lopez ~ NOTARY PUBLIC (name printed or typed) 78 The BetaJones Group/RFQ#26-07-01 PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Sunny Isles Beach _____________ by____________________________________________________________________________ [print individual’s name and title] for____________________________________________________________________________ [print name of entity submitting sworn statement] whose business address is: _______________________________________________________________________________ _______________________________________________________________________________ and (if applicable) its Federal Employer Identification number (FEIN) is_____________________. (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:_________________________________.) 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER 28, 2010 79 The BetaJones Group/RFQ#26-07-01 5. 6. X market value under an arm 's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affil iate. understand that a "person" as defined in Para. 287 .133(1 )(e), Florid a Statutes , me ans any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services Jet by a public entity , or which otherwise transacts or applies to transact business with a public entity . The term "persons" includes those officers , directors, executives , partners, shareholders , employees, members , and age nts who are active in management of any entity. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting th is sworn statement. (Indicate which statement applies.) Neither the entity submitting this sworn statement, nor any of it's officers , directors , executives , partners , shareholders , employees , members, or agents who are active in the management of the entity , nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting th is sworn statement, or one or more of its officers, directors , executives, partners , shareholders, employees, members, or agents who are active in the management of the entity , o r an affiliate of the entity has been charged wi th and convicted of a public entity crime subsequent to July 1, 1989 . The entity submitting th is sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members , or agents who are active in the management of the entity , or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida , Division of Admin istrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida , Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFI ED IN PARAGRAPH 11 .1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND , THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED . I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRES OLD MOUNT PROVIDED IN SECTION 287 .017 , FLORIDA STATUTES, FOR CATEGORY TWO OF A , C A IN E INFORMATION CONTAINED IN THIS FORM . By : (Title) Sworn to and subscribed before me this 14th day of __ J_u_IY _______ , 20~, by Luis A Betalleluz (AFFIX NOTARY S~J:Jf~ S Notary Public · State of Florida Comm• HH334347 ~'-tee 'i'' Expires 1/15/2027 Notary: Michelle C. Lopez Signature : w o.a ~ Personally Known __ X ___ OR Produced Identification----------------- 80 The BetaJones Group/RFQ#26-07-01 E Q UAL OPPORTUNITY / AFFIRMATIVE ACT IO N City of Sunny Isles Beach 18070 Collins Avenue Sunny I sles Beach , FL 33160 Telephone : (305) 947-0606 Fax. (305) 949-3113 EQUAL OPPORTUNITY/ AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the pr inciples and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations proh ibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and pol itical affiliation or belief. Signed: Title: Prin e· Firm: The BetaJones Group , Inc Address: 801 Brickell Ave. Suite 800 Miami , Florida 33131 DECEMBER 28 2010 81 The BetaJones Group/RFQ#26-07-01 CONFLICT OF INTEREST City of Sun ny Isles Beach 18070 Coll ins Avenue Sunny Isles Beach , FL 33160 Telephone: (305) 947-0606 Fax : (305) 949-3113 CONFLICT OF INTEREST STATEMENT The a ward of any contract hereunder is subject to the provis ions of Chapter 112, Flor ida State Statutes. Proposers must disclose with their Bids, the name of any officer, directo r, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY O F MIAMI -DADE BEF ORE ME, the undersigned authorit y, personally appeared _L_u_is_A_._B_e_ta_lle_lu_z ____ , who was duly sworn, deposes, and states: 18.1. 1 am the P rin cipal of ..JT..Jh~e.......,B,e!w..lo.lta~J>Lo!ol.J..JnL.loe..,sL.L.loGo!Jr~oLiu.t..lpOL<-. .ul n...Lcw...._ __ with a loca l office in 80 1 Brickell Ave. Suite 800. Miami. FL 33131 and principal office in 801 Brickell Ave. Suite 800. Miami , Fl 33131 18.2. The abov e named entity is subm itti ng a Bid for the City of Sunny Isles Beach , Bid No. 26-07-01 described as : Golden Shores Street Lighting . The Affiant has made dili gent inquiry and provides the inform ation contained in this Affidavit based upon his own knowledge . 18.3 The Affiant states that only one subm ittal for the above Bid is being submitted and that the abov e named entity has no financial in terest in other entit ies subm itting Bids for the same project. 18.4 Ne ither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion , or othe rwi se taken any actio n in restraints of free competitive pricin g in connection with the entity's submittal for the above Bid. This statement restricts the d iscuss ion of prici ng data until the co mpletion of negotiations if necessary and execution of the Contract for this project. 18 .5 Neither the entity nor its affiliates, nor any one associated wi th them , is p resently suspended or otherwise ineligible from participation in contract letting by any local , State, or Federal Agency . 18.6 Neither the entity, nor its affil iates , nor any one associated with them have any potential conflict of interest due to any other clients , contracts, or property interests for this project. 18.7 I c ertify that no member of the entity's owner ship or management is presently apply ing for any employee position or actively seeking an elected position with the C1ty of Sunny Isles Bea ch . 18 .8 1 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach . ~--;r....,---...--..---.---...---.,--,r-r-......... ~· 202 6. M=~~'----'="'-'-""-.!....>.:..""""~"""""'""'z.... Lu is A. Be tallelu z. Pr incipal Pr int or Type Name and Title and subscribed before me th is 14th day of July , 2026. Personally Known OR Produced Identifi cation ; Type of Identification __________ _ NOTARY PUBLIC STATE OF FLORIDA DECEMBER 28 2010 S MICHEU.E LOPEZ Notary Public State of Florida Comm# HH334347 Expires 1/15/2027 82 The BetaJones Group/RFQ#26-07-01 D I SPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach , FL 33160 Telephone: (305) 947-0606 Fax : (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please explain in t he space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been su sp ended by the Depa rtment of Professional Regulations or any other regu latory agency or profe ssiona l associations within the last five (5) years? YES ___ _ X NO ___ _ 19.2. Has your firm , or an y mem ber of your fi r m , been declared in defau lt, terminated or removed from a contract or job re lated to the services your firm prov ides in the regu lar course of business within the last fi ve (5) ye ars? YES ___ _ X NO ___ _ 19.3. Has your firm ha d against it or filed any requests for equi tab le adjustment, contract claims, Bid protests, or litigation in the pas t fi ve (5 ) years that is related to the services you r firm prov ides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contr act claim, litigation, or protest, and state a b rief description of the case, the outcome or status of the su it and t he monetary amounts of extended contract time involved. I he reby certify that all statements mad e are t rue and agree and understand that any misstatement or misrepresentation of fa lsification of facts sha ll be cause for forfeiture of rights for further consideration of this Bid f or the City of Sunny Isles Beach. The Be taJo Group , Inc 7/14 /2026 Firm Date ( Lu is A. Betalle l uz, Pri ncipal Print or Type Name and T itle DECEMBER 28, 2010 83 The BetaJones Group/RFQ#26-07-01 STATE OF FLORIDA ) ) COUNTY OF MIAMI-DADE ) ANTI-KICKBACK C ity of Sunn y Isles Beach 18070 Collins A ve nue Sunny Isles Beach, FL 33 160 Telephone: (305) 947-0606 Fax : (30 5) 949-3113 ANTI-KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid w ill be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: Luis A. Betalleluz Title: Principal The foregoing instrument was acknowledged before me this 14th day of July , 202.ft_, by Luis A . Betalleluz [name of person], as ..LP....I.JriLLJn.loi.c....,ipC!Oia"-1------------[type of authority], for ....:.T..:....:h=e--=B=e=ta=J=o=n,e=s=a_,G=r-"'o=u.:::.p..__. :..:..;ln=c ____ [name of party on behalf of whom instrument was ex ecuted]. AFFIX NOTARY STAMP HERE: MICHELLI LoPEZ Not1ry Public St1te of FlortdJ Comml HH33434 7 ~CE \9'\~ Expires 1/15/2027 Print or Type Commissioned Name Personally Known X OR Produced Identification ___ _ Type of Identification Produced _____________ _ DECEMBER 28, 2010 84 The BetaJones Group/RFQ#26-07-01 CONTRACTOR ANTI-BOYCOTT CERTIFICATION [PURSUANT TO FLORIDA STATUTE§ 215.135\ I, _Lu_i_s_A_. _B_et_a_lle_l_uz ___ , o n behalf of The BetaJones Group , Inc Print Name certifies that The BetaJones Group , Inc Company Nam e 1. Participate in a boycott of I srael; and Company Name does not: 2. Is not on th e Scrutinized Companies that Boycott I srael list; and 3. Is not o n the Scrutini zed Comp anies with Activities in S udan List; and 4. Is not on the Scrutinized Companies with Activities in the Iran P etroleum Energy Sector List; an d 5. Has not engaged in busin ess operations in C uba or Syria. Title 7/14/2026 Date 85 The BetaJones Group/RFQ#26-07-01 E-Verjfy Affjdayjt Florida Statute 448.095 directs all public employers, including municipal governments , to verify the employment eligibility of all new public employees through the U.S. Department of Homeland Security's E- Verify System , and further provides that a public employer may not enter into a contract unless each party to the contract registers with and uses the E-Verify system. Florida Statute 448.095 further provides that if a contractor enters into a contract with a subcontractor, the subcontractor must provide the contractor with an affidavit stating that the subcontractor does not employ , contract with , or subcontract with an unauthorized alien . In accordance with Florida Statute 448 .095 , all contractors doing bus in ess with the C ity of Sunny Isles Bea ch are required to verify employee eligibility using the E-Verify sys tem for all existing and new employees hired by the contractor during the contract term . Further , the contractor must also require and maintain the statutorily required affidavit of its subcontractors. It is th e responsi bi lity of the awarded vendor to ensure compl iance withE-Verify requ irements (as applicable). To enroll in E-Verify, employers should visit the E-Verify website (https ://www.e-verify.gov/employers/enrolling-i n-e-verify) and follow the instructions. The contractor must, as usual , reta in the 1-9 Forms for inspection. By affix ing your signature below you hereby affirm that you wi ll comply with E-Verify requ irements. 7/14/2026 Date Principal T itle 20-8447695 Federal Employer Identification Number (FEIN) Notary Pub!jc lntormatjoo Sworn to and subscribed before me on thi s this 14th day of ___ J_u_IY ______ , 2026. Lu is A. Betalleluz By _____________________ _ a!l Is personally known to me D Has produced id en tification (type of identification produced: --------· t-1\t" L h12-1l ~ t <. Lo 0!?-i- Print or Stamp of Notary PubliC' ---=E-xp....,.ir-a-.-tio_n_D=---cat_e __ __ 1/15/2027 MICHEU.E LOPEZ . Notary Public State of Flortda Commt HH334347 Expires l/15/2027 86 The BetaJones Group/RFQ#26-07-01 AFFIDAVIT OF COMPLIANCE WITH FOREIGN ENTITY LAWS City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach , FL 33160 Telephone : (305) 94 7-0606 Fax : (305) 949 -3 113 The undersigned , on behalf of the entity listed below ("Entity"), hereby attests under penalty of perjury as follows: 1. Entity is not owned by the government of a foreign country of concern , as defined in Section 287 .138 , Florida Statutes . 2 . The government of a foreign country of concern does not have a controlling interest in Entity , as defined in Section 287 .138 , Florida Statutes . 3 . Entity is not organized under the laws of a foreign country of concern , as defined in Section 287 .138, Florida Statutes. 4 . Entity does not have a principal place of business in a fo rei gn country of concern , as defined in Section 287 .138 , Florida Statutes . 5 . The undersigned is authorized to execute this affidavit on ehalf of Entity . Date : July 14th 20 26 ---------· - Entity : The BetaJones Group , Inc STATE OF FLORIDA COUNTY OF MIAMI-DADE Name :~--~------------- Title : Prin cipal The foregoing instrument was acknowledged before me , by means of KJ lfhysical pre.sence or 0 online notarization , this 14th day of July , 20_6 _, by LUis A. Betalleluz as Princ ipal for The BetaJones Group , Inc , who is personally known to me or who has produced as identification . Notary Publ ic Signature: t::d\.AQ ~ \ Print Name : Michelle C. Lopez State of Florida at Large (Seal ) My commission expires : 1/15/2027 I> MI04ELLE LOPEZ Notary Public · State of Florida Comml HH334347 Expires 1/15/2027 87 The BetaJones Group/RFQ#26-07-01 TAB 7 NON-CONTINGENT FEES 88 The BetaJones Group/RFQ#26-07-01 TAB 8 EXCEPTIONS 801 Brickell Avenue ∙ Suite 800 ∙ Miami, Florida 33131 August 11, 2026 THE BETAJONES GROUP – EXCEPTIONS CITY OF SUNNY ISLES BEACH RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) The BetaJones Group, Inc. has reviewed the RFQ requirements and has no exceptions, deviations, or reservations. We agree to comply with the requirements, terms, and conditions of the solicitation as issued. 89 The BetaJones Group/RFQ#26-07-01