Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Calvin, Giordano & Associates, Inc. Bid Document (32)
Point of Contact: Jeannie Walsh-Fabian Senior Account Manager 786.481.8366 JFabian@safebuilt.com Due Date and Time: August 11, 2026 at 11:00 am Prime Firm: Calvin, Giordano & Associates, Inc. 1800 Eller Drive, Suite 600RFQ # 26-07-01 City of Sunny Isles Beach, FL Fort Lauderdale, FL 33316Continuing Professional Architectural and Engineering Consulting Services (CCNA) Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 3 Tab 1. Company Information.......................................................................................................................................................4 Tab 2. Qualifications..................................................................................................................................................................7 Tab 3. Staffing..........................................................................................................................................................................57 Tab 4. Approach / Methodology...............................................................................................................................................113 Tab 5. References...................................................................................................................................................................117 Tab 6. Contract Forms.............................................................................................................................................................123 Tab 7. No Contingent Fees Equal Opportunity Statement..........................................................................................................148 Tab 8. Exceptions...................................................................................................................................................................150 Appendix: Additional and Sub-Consultant Team Member Licenses........................................................................................152 Additionally, CGA has won the following awards for its bridge designs for the City of Sunny Isles Beach: - In 2020, CGA won ASLA Florida’s Conceptual Category Award of Merit for our 174th St Bridge Park Concept. - In 2021, CGA won ASLA Florida’s Urban Design Category Award of Merit for Sunny Isles Beach Pedestrian Bridge. Table of Contents Tab 1 Avenue Road Improvements - Company Information CGA’s Roadway Design, Traffic Engineering, Drainage, Lighting, and Landscape/Irrigation Plans - Davie Road Phase 2 in Davie, FL Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 5 Name of Company Calvin, Giordano & Associates, Inc. (CGA) Company Locations CGA headquarters is located in Fort Lauderdale. We also have offices in Cutler Bay, West Palm Beach, Orlando, Pinellas County, and Lee County. Website Address www.cgasolutions.com Details of Entity Business Structure Corporation Date Founded 1937 Headquarters Address and Phone Number 1800 Eller Drive, Suite 600 Fort Lauderdale, FL 33316 954.921.7781 Case Name Case Number Nature of Action Settlement Amount Status Vega v. City of Pembroke Pines CACE 23-008466 Injury $160,000.00 Closed Alex Fuentes Reyes v. CGA CACE-23-007673 Auto accident $150,000.00 Closed Nance v. FritoLay 22-015977-CA-01 Wrongful death Information not available Open Keel v. CGA CACE-22-016214 Auto accident $1,000,000.00 Closed Leonel Gonzalez v. Geico General Insurance Company, CGA 2023-012587-CA-01 Wrongful death Information not available Closed Y. Reyes v. CGA Information not available Auto accident $2,000,000.00 Closed Gari v. CGA CACE 22-015422 Injury $110,000.00 Closed Keisha Laughton-Young v Pembroke Pines CACE-21-020880 Injury $120,000.00 Closed Detwiler- Erwin v. CGA CACE-21-017905 Negligence $75,000.00 Closed CGA’s Headquarters in Fort Lauderdale Homepage of CGA’s Website Outstanding Litigation Although in the normal course of business, CGA is involved in litigation from time to time, generally from third parties, we have never been involved in litigation that would threaten our viability or the performance of this contract. Proof of Insurance You will find CGA’s Certificate of Insurance (COI) on the following page. History of Litigation Below, you will find a history of CGA’s Civil Litigation case for a five-year (5) period of time immediately preceding RFQ # 26-07-01: Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 6 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBRWVDADDLINSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?(Mandatory in NH) DESCRIPTION OF OPERATIONS belowIf yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIREDAUTOS ONLY 5/7/2026 McGriff Insurance Services LLC9850NW41stStreetSuite100DoralFL33178 Lauren Mayer 954-389-1289 lauren.mayer@marshmma.com Everest Indemnity Insurance Company 10851 132SAFEBLLC Bridgeway Insurance Company 12489Calvin,Giordano &Associates,Inc.1800 Eller Dr.Suite 600,114,501FortLauderdaleFL33316-4208 Great American E&S Insurance Company 37532 Federal Insurance Company 20281 Berkshire Hathaway Homestate Ins Co 20044 1236593847 A X 1,000,000 X 300,000 X 10,000 10,000 1,000,000 2,000,000 X X Y Y CF3GL00415251 10/3/2025 10/3/2026 2,000,000 A 1,000,000 X X X Y Y CF3CA00337251 10/3/2025 10/3/2026 Excess per occ /agg 1,000,000 B X 10,000,000 X Y 8EA7XL000207904 10/3/2025Y 10/3/2026 10,000,000 X -0- E X N Y SAWC772257 5/12/2026 5/12/2027 1,000,000 1,000,000 1,000,000 CD Professional LiabilityCrime TER5780118J06767825 10/3/202510/3/2025 10/3/202610/3/2026 Each Claim/Aggregate1,000,000 10,000,000DED$10,000 Excess policy #140002058 effective 10/03/2025 -10/03/2026 -QBE Ins Corp NAIC #39217 -Limits-$5,000,000 part of $10,000,000 Excess of $5,000,000.Technology Errors &Omissions and Cyber Coverage -Allied World Assurance Company US,Inc.NAIC #19489 -Policy #03148733effective10/3/25 -10/3/26.Each Claim/AGG $3,000,000 DED $100,000. For Informational Purposes only CGA’s Standard COI Tab 2 Avenue Road Improvements - Qualifications CGA’s Landscape Architecture, Civil Engineering, Construction Administration, Electrical Engineering, Resiliency Design, and Environmental Permitting - Middle Beach Recreational Corridor in Miami Beach, FL Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 8 Below, you will find the Top 8 reasons why CGA stands out from its competition: 1. Multidisciplinary In-House Team for Seamless Integration Unlike many competitors, CGA offers a fully integrated, multidisciplinary team—including landscape architects, civil engineers, surveyors & mappers, transportation/transit/traffic engineers, CEI professionals, grant writers, construction administrators, and construction project managers—all under one roof. This integrated structure promotes efficiency; consistent, streamlined communication; faster turnaround; and holistic servicing that addresses infrastructure, environment, and community concerns in one cohesive strategy. 2. Proximity to Job Site CGA’s headquarters in Fort Lauderdale is less than fourteen (14) miles from Sunny Isles Beach City Hall. 3. Seventeen (17) Years of Experience with the City CGA is very proud to state that we have provided a broad, diverse array of services to the City since 2009. Because of this longstanding working relationship, we are notably familiar with each others’ workstyles, and our collaborative efforts have repeatedly proven to be successful and effective. Along those lines, by sticking with CGA, the City will not experience any lag time that occurs while transitioning to a new contractor. 4. Proven Long-term Success throughout South Florida From the beginning, much of our reputation was built on repeat business with clients from the public and private sectors in South Florida. Our success is reflected in both the quality of work we consistently provide and the personal approach we take with each client. The winning combination is affirmed by our large number of repeat/long-term municipal clients. Because of our diversity, CGA can control the entire process, offering a host of professional services as a one-source partner, or efficiently tackle time-sensitive individual projects, providing customized solutions with handpicked teams of highly experienced professionals. Taking advantage of our diversified staff’s experience and knowledge is what distinguishes CGA as a professional consultant and what allows our team to repeatedly complete projects on time, under budget and exceeding expectations while doing so. 5. Stability and Depth of Resources In 2018, CGA joined the SAFEbuilt family of companies, providing our clients with the stability and depth of resources of a national company with service delivery at a local level. CGA provides a comprehensive range of community development services to municipalities throughout Florida. We leverage our extensive local knowledge alongside the broader capabilities of SAFEbuilt to deliver each client the highest levels of service, expertise, and resources. As part of the SAFEbuilt family, we will focus on continued growth in Florida, implementing new technologies and expanding our services along the way to meet the ever-changing needs of our clients. We strive to develop new partnerships with organizations and businesses to provide superior services and create an even more comprehensive suite of solutions for our clients. As the world of construction continues to evolve, CGA remains committed to providing its clients with the best solutions, helping them achieve their goals and create a better future. 6. Perfectly Aligned Goals Our core values embody our approach to our working relationships, as well as our philosophy in providing services. Our team stands apart from others by remaining dedicated to a client-centered method based on our core values of Service, Integrity, Improvement, Teamwork, and Respect. Our goals are perfectly aligned with the goals of the City, and together we can meet your objectives to invigorate your culture through scalable, sustainable, and affordable business practices. 7. Nearly Nine Decades of Experience with Barrier Island Communities Founded in Hollywood in 1937, we have provided related services to barrier island communities (e.g., Hollywood Beach) for 89 years. For example, we understand the deIicate balance between land use, conservation, and resilience—particularly vital for a barrier island community. Our team is well-versed in providing services and crafting plans that protect natural resources while aligning with federal, state, and local policies. 8. Effective Emergency Response CGA is proud of our history supporting municipal agencies in their time of need. In the aftermath of storms, CGA has been able to assist numerous municipalities in the recovery effort. CGA has repeatedly deployed our team of over 80 National Incident Management System (NIMS) and Federal Emergency Management Agency (FEMA) certified staff to properly document the damage, manage, and assist in the recovery effort. More specifically, CGA staff was part of the Hurricane Ian post-assessment and recovery effort in the Village of Estero and assisted Estero, as well as barrier island communities in the Tampa Bay region, in the aftermath of Hurricanes Debby and Milton. CGA’s support during these events assisted the municipalities in achieving their refund of recovery costs with FEMA funds. Why Is CGA the Best Qualified Candidate? Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 9 Demonstration of Qualifications - Minimum Qualification Requirements Minimum Qualification Requirement #1: Licensing Requirements I. Active Sunbiz Registry As of the submission deadline, CGA is registered with the Florida Secretary of State through Sunbiz and is in “Active” standing (Document # M17373). Later in this tab, you will find an image of this registry in the Occupational License Registration section. II. Florida Architecture License CGA is not bidding on the Architects category. III. Florida Engineering License CGA holds an Engineering Registry issued by the State of Florida Department of Business and Professional Regulations (DBPR). Our registry number is 514; you will find an image of this registry in the Occupational License Registration section later in this tab. Our proposed team members with PE licenses include Jenna Martinetti, Nicholas “Nico” Kanelidis Heidi Belle Henderson, James “Jimmy” Messick, Pablo Chon Kan-Munoz, Salman Rathore, Erik Padron, Hugo DaSilva, and Jorge Cervantes In addition, four (4) of our Sub-Consultants have proposed team members with PE licenses. On the following pages, we present images of the PE licenses of CGA’s proposed team members. You will find images of the PE licenses of our Sub-Consultants’ proposed team members in the Appendix at the end of this document. IV. Leadership in Energy and Environmental Design (LEED) Proposed team member Tammy Cook-Weedon holds numerous licenses and certifications, including a current and valid LEED AP+C. Additionally, both of the proposed team members from Delta G Consulting Engineers, Inc. (our Sub-Consultant for Mechanical, HVAC & Plumbing Engineers) hold LEED certifications. On the following pages, we present an image of Ms. Cook-Weedon’s LEED certification. You will find images of the LEED certifications of our Sub-Consultants’ proposed team members in the Appendix at the end of this document. V. Surveyors and Mapping CGA holds a Board of Professional Surveyors and Mappers Certificate of Authorization issued by the Florida Department of Agriculture and Consumer Services (FDACS). Additionally, proposed team member Steven M. Watts holds a Professional Surveyor and Mapper (PSM) license issued by the FDACS. On the following pages, we present an image of Mr. Watts’ PSM license. In t Ms. Cook-Weedon’s LEED certification. Later in this tab, you will find an image of CGA’s Board of Professional Surveyors and Mappers Certificate of Authorization in the Occupational License Registration section. Minimum Qualification Requirement #2: Experience Within the past five (5) years, 2020-2025, CGA far surpasses the City’s requirement of three (3) government contracts of similar size and scope as to the requested services outlined in this RFQ. Below, we have listed three (3) contracts per discipline upon which we are bidding. In the Project List section later in this tab, you will find full- page writeups about each of these contracts, as well as descriptions of many other related projects. Landscape Architects • Lamar Louise Curry Park - City of Coral Gables, FL • North Beach Oceanside Park - City of Miami Beach, FL • Paradise Park - Village of Key Biscayne, FL General Civil Engineers • A1A Area Water and Sewer - City of Boca Raton, FL • CDBG 47 (NW 10th St Drainage and ADA Improvements) - City of Hallandale Beach, FL • NPDES Permit Compliance - City of South Miami, FL Surveyors and Mapping • Camden Drive and Bal Cross Drive Sanitary Sewer - Bal Harbour Village, FL • FDEP Gore Building - Monitoring Wells - City of Fort Lauderdale, FL • NW 57th Court & NW 57th Place - Stormwater Improvements - City of Fort Lauderdale, FL Transportation/Transit/Traffic Engineering • Las Olas Boulevard and SE 3rd Avenue Signalizations - City of Fort Lauderdale, FL • Sunset Harbour Neighborhood Traffic Study - City of Miami Beach, FL • Pedestrian Priority Zone - City of Miami Beach, FL Construction Engineering & Inspection (CEI) Services • Alameda / West Lakes Drainage Improvements - Town of Miami Lakes, FL • Venetian Causeway - City of Miami Beach, FL • Jefferson Seawall - City of Miami Beach, FL Minimum Qualification Requirement #3: References To make sure we meet the City’s stated preference regarding this MQR in Addendum #7, we present the completed Reference Questionnaires of four (4) of CGA’s clients, which represent three (3) clients apiece for each discipline upon which we are bidding. You will find more information about which discipline(s) each questionnaire represents in Tab 5. Combined, these 4 questionnaires in which the Proposer served as primary consultant for projects similar in size and scope within the last five (5) years, 2020 - 2025. PE Licenses - CGA Team Members Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 10 Melanie S. Griffin, SecretaryRon DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES DA SILVA, HUGO E. Do not alter this document in any form. 8191 SOLANO AVE. LICENSE NUMBER: PE73249 EXPIRATION DATE: FEBRUARY 28, 2027 This is your license. It is unlawful for anyone other than the licensee to use this document. APT. 201 HOLLYWOOD FL 33024 Always verify licenses online at MyFloridaLicense.com DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION LEED Certification - CGA Team Member PSM License - CGA Team Member Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 11 CGA utilized its High-Definition Laser Scanner for this Survey Project in Fort Lauderdale, FL. • Water main design (raw, reuse, and potable) • Water use permits (both potable and irrigation) • Computer modeling of water, wastewater, and stormwater systems • Master planning and design • Construction inspection and observation Surveying and Mapping CGA is an industry leader in applying 3D Laser Scanning technology to real-world applications. Similar to a camera but much more detailed, laser scanning involves the capture of digital information that can be processed into point cloud data and used by a variety of software platforms such as AutoCAD and Revit. The benefits of laser scanning include the ability to obtain large amounts of survey data in a non-contact environment. CGA is using this methodology and a Trimble X7 Laser Scanner to capture survey data of building facades for hurricane hardening applications. Multiple 3D scans are taken around a building from ground level to the roof and processed into an overall point cloud, which enables the end user to measure window/door openings, structural columns, roof overhangs, facia and soffits. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 12 Below, we present short descriptions that demonstrate our qualifications for each discipline upon which we are bidding, as well as the required services we are providing in-house. Landscape Architects CGA brings extensive experience in the full lifecycle of design implementation—from initial concept development through design refinement and into construction execution. Our team comprises professionals with a wide range of relevant licenses, certifications, and cross-disciplinary educational backgrounds, which supports our commitment to delivering comprehensive and well-integrated projects. Our approach is grounded in thoughtful contextual analysis, inclusive stakeholder engagement, and a creative process that balances visionary thinking with practical implementation. This methodology ensures that our solutions are both imaginative and achievable. We offer a comprehensive suite of services tailored to meet the diverse needs of municipalities. These services include hardscape, greenway, and streetscape design; recreation and park facility planning; municipal landscape code compliance and inspection; redevelopment master planning; arborist and vegetation consulting; irrigation system design; and detailed planting design for varied conditions such as parks and open spaces, transportation corridors, roundabouts, transit shelters, decorative paving systems, ecological mitigation areas, visual buffers, and general site landscapes. General Civil Engineers CGA’s civil engineering department has multiple areas of expertise, including municipal, utility, land development, stormwater, and roadway engineering, as well as traffic engineering and transportation planning. CGA has the capability—both internally and/or through the coordination of subconsultants—to effectively design and manage the projects the City needs completed per the RFQ. Our municipal team serves as consultants or staff engineers to various local, county, and state governments. In this capacity, we assist with development and engineering permit reviews, and we serve as temporary in- house engineers. The utility team provides design and permitting assistance with projects associated with water and wastewater infrastructure improvements. CGA’s land development team performs civil site work design applications for our public and private sector clients, including park reconstructions, municipal facilities, hospitals and new developments. Our roadway team plans, designs, and permits roadways—ranging from turn lanes to complete streets projects and required off-site improvements for development projects. The stormwater team performs drainage evaluations for sites, neighborhoods, and basins; we also prepare design and construction documents for various types of stormwater improvements. CGA has successfully completed numerous types of municipal projects, including: CGA provided Landscape Review and Arborist Services for The Underline Phase 3 in Miami- Dade County, FL CGA’s Civil Engineers provided Stormwater Pump Station Rehab services to the City of Sunny Isles Beach, FL. Demonstration of Qualifications - Disciplines • Street improvements (both paving & drainage) • Complete streets, streetscapes, and parking lots • Sewer collection system and transmission mains (both force and gravity) • Stormwater management and pump station designs (both new and rehabilitation) Surveying and Mapping (Continued) For example, CGA was contracted to provide a scan model of the interior wall and cubicle layout of a 59,000 sq. ft., single story building at 200 Park Central Drive S, Pompano Beach, Florida. Numerous scans were taken throughout the interior of the building to capture all partitions, survey data was processed, the point clouds were made available to the architect, and an as-built survey was prepared showing dimensions of rooms, offices, storage spaces, etc. Transportation/Transit/Traffic Engineering CGA’s Transportation/Transit/Traffic Engineering team consists of in-house transportation planners, roadway engineers, and traffic engineers, who have a history of working together to lead transportation/transit/traffic engineering projects and contracts. The CGA Team will contribute to the development of smart solutions using the very best engineering judgment with deliverables that will be carefully prepared, reviewed, submitted on time, and within budget. The team has successfully completed mast arm upgrades, complete streets projects, roundabouts, traffic impact studies, signal warrant analysis, widening projects, and ADA upgrades for many municipalities in South Florida. In addition, the team has multiple Temporary Traffic Control (TTC) Advanced Certified staff, as well as staff experienced in LAP and other grant funded projects. CGA’s transportation team also assists multiple municipalities in their review of site plans and traffic impact studies as part of their internal site plan review team, as well as reviews during engineering permitting. Construction Engineering and Inspection (CEI) Services Our CEI Department has been providing services in the transportation industry for over 20 years. CGA strives to ensure that our clients’ projects are built in accordance with FDOT Standard Specifications for Road and Bridge Construction, FDEP, and cities’ and counties’ approved plans and specifications. Our clients include Florida Department of Transportation Districts 1, 4, 6 & 7; the Florida Department of Environmental Protection; and over 32 local municipalities across the state of Florida. Our CEI Department is committed to delivering a project that is not only constructed in reasonable conformity with the plans and specifications but also one that satisfies all federal, state, and local requirements. By integrating rigorous materials testing, diligent schedule oversight, and proactive dispute resolution, we will ensure that the City meets its goal of a safer, more accessible community, delivered on time and in full compliance with all funding agency standards. CGA provides qualified, experienced staff tailored to each municipal CEI assignment. Our approach centers on constant vigilance, transparent communication, and meticulous record-keeping, ensuring that each project meets all environmental obligations while protecting the City’s interests and local natural resources. Professional Grant Writing CGA has experience providing Grant Application writing as well as Grant Administration. We monitor grant compliance throughout the project “life,” including appropriate invoicing, grant procedural requirements not to jeopardize any eligibility of grant reimbursement. The complex network of federal and state rules and regulations requires nothing short of diligence, aggressive follow-up, troubleshooting, and follow-up with grant agencies. We are proactive to ensure the appropriate steps are taken before problems arise, not after. Construction/Project Management/Administration CGA has provided Construction Administration services (including Project Management and Project Administration) to numerous clients throughout South Florida, including the Cities of Fort Lauderdale, Dania Beach, Weston, Plantation, Boca Raton, Miami Beach, and more. While performing Construction Administration, CGA acts as the central hub for project coordination, ensuring all parties—including the Contractor, subconsultants, and utility agency owners (UAOs)—are aligned with project objectives. By fostering this environment of unification and solidarity, CGA ensures that site coordination is not just a reactive task, but a strategic component of our overall project delivery that keeps the City’s best interests at the forefront of every decision. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 13 CGA’s provided Construction Administration for this FEMA Project in Fort Lauderdale, FL. CGA CEI Project - Kemp Channel in Florida Keys, FL CGA’s Andrews Avenue Roadway Improvements - Oakland Park, FL CGA provided CDBG Grant Administration for this housing development in Miramar, FL. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 14Jenna Martinetti, PEMichael Conner, PLA, ASLA, ISASophia Neves, PLA, ASLATammy Cook-Weedon, PLA, ASLA, LEED AP+CValeriia Tokacheva, PLAMarcos MendozaWilliam “Bill” TesauroNicholas “Nico” Kanelidis, PEJames “Jimmy” Messick, PEHeidi Belle Henderson, PETingfeng “Ting” Zhao, EISeamus Quinn, EIRocco Diaz, EIJessica Cano Pablo Chon Kan-Munoz, PE, PTOSalman Rathore, PELee RowbothamCarlos LemusSteven M. Watts, PSMRobert “Bob” VonderaheKyle PeetsErik Padron, PE, MSCEHugo DaSilva, PE, BSCECarlos Rodriguez-Pagan, BSCEAbdulreza “Reza” Shams, BSCEMohammed HedarianLeonardo BozaLance RobinsonLuis Rivera Jorge Cervantes, PEVickki Placide-Pickard Kenya LouidorDavid “Dave” Dixon, AICPDelta G Consulting Engineers, Inc.GM2, Inc.Lambert Advisory .National Data & Surveying Services, Inc. (NDS)Nutting Engineers of Florida, Inc. US Utility Potholing & Air ExcavationDiaz-Murphy & Associates CES, LLC (DMA)Requirement from Scope for Landscape Architects Consultation, investigation, research, planning, design X X X X X Preparation of drawings, specifications, contract documents and reports X X X X X Responsible construction supervision X X X X X X X X X X X X Landscape management in connection with the planning and development of land and incidental water areas X X The use of Florida-friendly landscaping as defined in s. 373.185, where, and to the extent that, the dominant purpose of such services or creative works is the preservation, conservation, enhancement, or determination of proper land uses, natural land features, ground cover & plantings, or naturalistic & aesthetic values X X X X X Provision of signed and sealed drawings and specifications for landscaping construction projects X X X Develop bid specifications for landscape maintenance services X X X X X Site master planning, analysis and design X X X X Urban design plans/concept diagrams X X X X Open space planning, analysis and design X X X X X Development of design guidelines X X X Development of Maintenance Standards X X Perform landscape maintenance service inspections X X Renderings X X Provide inspections and plan reviews X X X Beach and Dunescaping X X X X X Active and Passive Park Design X X X X X Irrigation Design X Irrigation Operation and Maintenance X Median and Swale Landscaping Design X X X X X Streetscape planning, analysis and design Peer review analysis X X X X X X Natural resource planning, analysis and design Cost estimates X X X Cost estimates X X X X X Provide plans developed on AutoCAD’s latest version, and copies of a reproducible hard copy and CD of plans to the City X X X X X Feasibility analysis and Peer review analysis X X X X Construction phase services including site inspections and permit assistance X X X X X X X X X X X Tree surveys and RER tree removal permitting X Attendance at meetings with City staff and presentations to City Commission X X X X X X X Provide construction administration if requested by the City X X X X X X X Prepare and submit signed and sealed construction drawings X X X Assist with amending existing landscape ordinances or drafting new ordinances X Miscellaneous tasks as requested by the City Manager.X X X Demonstration of Qualifications - Item-by-Item Disclosure The matrix below and on the following pages summarizes the specific abilities of our proposed team, relative to the Scope of Ser vices in the RFQ. Each X indicates that the corresponding team member meets or exceeds qualifications to perform the corresponding task. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 15 XJenna Martinetti, PEMichael Conner, PLA, ASLA, ISASophia Neves, PLA, ASLATammy Cook-Weedon, PLA, ASLA, LEED AP+CValeriia Tokacheva, PLAMarcos MendozaWilliam “Bill” TesauroNicholas “Nico” Kanelidis, PEJames “Jimmy” Messick, PEHeidi Belle Henderson, PETingfeng “Ting” Zhao, EISeamus Quinn, EIRocco Diaz, EIJessica Cano EPablo Chon Kan-Munoz, PE, PTOSalman Rathore, PELee RowbothamCarlos LemusSteven M. Watts, PSMRobert “Bob” VonderaheKyle PeetsErik Padron, PE, MSCEHugo DaSilva, PE, BSCECarlos Rodriguez-Pagan, BSCEAbdulreza “Reza” Shams, BSCEJuan Carlos MarinMohammed HedarianLeonardo BozaLance RobinsonLuis RiveraJorge Cervantes, PEVickki Placide-PickardKenya LouidorDavid “Dave” Dixon, AICPDelta G Consulting Engineers, Inc.GM2, Inc.Lambert AdvisoryNational Data & Surveying Services, Inc. (NDS)Nutting Engineers of Florida, Inc.US Utility Potholing & Air ExcavationDiaz-Murphy & Associates CES, LLC(DMA)Requirement from Scope for General Civil Engineers Roadway & drainage improvement X X X X X X X X X X Stormwater wells to pressurized wells by adding pumps X X X X X Water distribution system X X X X X X X X X Wastewater collection system X X X X X X X X X Other Civil Engineering projects, which may include roads, bridges, pump stations, well injections, water and sewer, pipelines, structural components of buildings X X X X X X X X X X X X X X X X X X X X X Provide roadway design services X X X X X X X X X X NPDES permitting X X X X Provide feasibility study, planning X X X X X X X X Prepare construction solicitation documents X X X X X X X X X X X Prepare construction cost estimates X X X X X X X X X Prepare and process permit applications X X X X X X X X X Provide bidding assistance X X X X X X X Prepare, process, and administer grant applications X X X X Prepare computerized maps and records X X X Provide surveying, aerial mapping, and GIS Services X X X X X X Provide general plan review services X X X X X X X X X X X X Prepare financial, economic, and rate studies X Compliance with Federal, State and local Regulatory Agencies X X X X X X X X X Provide general consultation X X X X X X X X X Street engineering design X X X X X X X X X X Technical specification X X X X X X X X X Construction documents X X X X X X X X X X X X X X Bidding services X X X X X X X Construction administration services X X X X X X X X X X X X X X X X On-site representation X X X X X X X X X X Cost estimates X X X X X X X X X X X Other street engineering services including but not limited to field inspections, structural analysis, reports and recommendations for the repair and / or replacement of the city’s facilities X X X X X X X X X As needed, act as the City’s designated representative for various governmental engineering functions including review of development responses and issue comments related to compliance with relevant City Codes, participation in Design Review Committee, issuance or recommendations for issuance of various City permits, and attend meetings at the City’s request. X X X X X X Assist in preparing City ordinances, codes, standards, regulations, and policies X X X X X X Miscellaneous tasks as requested by the City Manager X X X Development and implementation of leak detection studies X Survey and audit phases of water distribution system leaks X Water conservation analysis, recommendations and related work X Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 16Jenna Martinetti, PEMichael Conner, PLA, ASLA, ISASophia Neves, PLA, ASLATammy Cook-Weedon, PLA, ASLA, LEED AP+CValeriia Tokacheva, PLAMarcos MendozaWilliam “Bill” TesauroNicholas “Nico” Kanelidis, PEJames “Jimmy” Messick, PEHeidi Belle Henderson, PETingfeng “Ting” Zhao, EISeamus Quinn, EIRocco Diaz, EIJessica CanoPablo Chon Kan-Munoz, PE, PTO Salman Rathore, PE Lee Rowbotham Carlos LemusSteven M. Watts, PSMRobert “Bob” VonderaheKyle PeetsErik Padron, PE, MSCEHugo DaSilva, PE, BSCECarlos Rodriguez-Pagan, BSCEAbdulreza “Reza” Shams, BSCEJuan Carlos MarinMohammed HedarianLeonardo BozaLance RobinsonLuis RiveraJorge Cervantes, PEVickki Placide-PickardKenya LouidorDavid “Dave” Dixon, AICPDelta G Consulting Engineers, Inc.GM2, Inc.Lambert AdvisoryNational Data & Surveying Services, Inc. (NDS)Nutting Engineers of Florida, Inc.US Utility Potholing & Air ExcavationDiaz-Murphy & Associates CES, LLC (DMA)Requirement from Scope for Mechanical, HVAC & Plumbing Engineers Study phase, design, and construction phase services relating to mechanical working drawings X HVAC working drawings X Plumbing drawings X Construction drawings X Related miscellaneous work X X Requirement from Scope for Structural Engineering Services Structural inspection X Condition assessment X Evaluation of structural integrity X Developing master plans X Designing new structures with complete replacement phasing stages X Designing the rehabilitation and strengthening of existing structures using conventional and advanced materials, such as composites and fiber reinforced polymers X Nondestructive testing X Under water inspection X Nonlinear finite element analysis X Integrity assessment of structural elements.X Design of repair/strengthening techniques and development of construction documents for all types of structures such as, buildings, bridges, seawalls, and water and wastewater plant structures. X Requirement from Scope for Surveyors and Mapping Design survey services relating to meets and bounds X X X Topography X X X Elevation certificates X X X GPS data collection and related work.X X X Miscellaneous tasks as requested by the City Manager X X X Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 17Jenna Martinetti, PEMichael Conner, PLA, ASLA, ISASophia Neves, PLA, ASLATammy Cook-Weedon, PLA, ASLA, LEED AP+CValeriia Tokacheva, PLAMarcos MendozaWilliam “Bill” TesauroNicholas “Nico” Kanelidis, PEJames “Jimmy” Messick, PEHeidi Belle Henderson, PETingfeng “Ting” Zhao, EISeamus Quinn, EIRocco Diaz, EIJessica Cano Pablo Chon Kan-Munoz, PE, PTOSalman Rathore, PELee RowbothamCarlos LemusSteven M. Watts, PSMRobert “Bob” VonderaheKyle PeetsErik Padron, PE, MSCEHugo DaSilva, PE, BSCEJulio Gonzalez, PEElizabeth Prida, PEOtto Letzelter, PE, SE, CFM, SI, BCACarlos Rodriguez-Pagan, BSCEAbdulreza “Reza” Shams, BSCEJuan Carlos MarinMohammed HedarianLeonardo BozaLance RobinsonLuis RiveraJorge Cervantes, PEVickki Placide-PickardKenya LouidorDavid “Dave” Dixon, AICPDelta G Consulting Engineers, Inc.GM2, Inc.Lambert AdvisoryNational Data & Surveying Services, Inc. (NDS)Nutting Engineers of Florida, Inc.US Utility Potholing & Air ExcavationDiaz-Murphy & Associates CES, LLC (DMA)Requirement from Scope for Transportation/Transit/Traffic Engineering Consulting services, including reports, studies, coordination with community organizations, construction plans and specifications, estimating and project management.X X X X X X Expertise and experience in traffic engineering, transportation planning, street and highway design, traffic calming design, transit planning, traffic studies, general engineering, X X X X Coordination with Miami-Dade County Transit, Metropolitan Planning Organization (MPO), Miami-Dade County, Florida Department of Transportation X X X Planning capabilities X X Multimodal planning (complete streets, bicycle and pedestrian facilities, micromobility)X X X Corridor and subarea studies X X X Transportation demand management (TDM) strategies X X Parking demand and shared parking studies X X Curbside and right-of-way management (loading, valet, TNCs, deliveries)X School zone planning and Safe Routes to School X X EV infrastructure planning X X Data collection and analysis (traffic counts, origin-destination studies, big data sources)X X X Development of performance metrics and mobility plans X X Grant identification, application preparation, and benefit-cost analysis X X X X X X Public outreach, stakeholder engagement, and community coordination X X Preparation of plans, studies, reports, and policy recommendations X X X X X X Traffic impact studies and operational analyses X X X X Intersection analysis and control evaluations (signals, roundabouts, all-way stop warrants)X X X X Traffic signal timing, coordination, and optimization X X X Intelligent Transportation Systems (ITS) planning and design X Speed studies and traffic calming design X X X X Vision Zero/roadway safety action plans, signing, pavement marking, and roadway lighting plans X X X Maintenance of Traffic (MOT) plans, parking operations and utilization studies X X X X Construction plans, specifications, and cost estimates X X X X X X X X X X X X X X X X X X Project management, including scheduling, budgeting, and interagency coordination X X X X X X Transit feasibility studies and service planning, route planning, stop placement, and service optimization X First/last mile connectivity solutions X Shuttle and circulator system planning X Transit amenities planning (shelters, accessibility improvements)X X Ridership analysis and forecasting X Integration of transit with land use and development patterns X Evaluation of emerging mobility options (microtransit, on-demand services)X Transit funding strategies and grant support X X Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 18Jenna Martinetti, PEMichael Conner, PLA, ASLA, ISASophia Neves, PLA, ASLATammy Cook-Weedon, PLA, ASLA, LEED AP+CValeriia Tokacheva, PLAMarcos MendozaWilliam “Bill” TesauroNicholas “Nico” Kanelidis, PEJames “Jimmy” Messick, PEHeidi Belle Henderson, PETingfeng “Ting” Zhao, EISeamus Quinn, EIRocco Diaz, EIJessica Cano Pablo Chon Kan-Munoz, PE, PTOSalman Rathore, PELee RowbothamCarlos LemusSteven M. Watts, PSMRobert “Bob” VonderaheKyle PeetsErik Padron, PE, MSCEHugo DaSilva, PE, BSCECarlos Rodriguez-Pagan, BSCEAbdulreza “Reza” Shams, BSCEJuan Carlos MarinMohammed HedarianLeonardo BozaLance RobinsonLuis Rivera Jorge Cervantes, PEVickki Placide-PickardKenya LouidorDavid “Dave” Dixon, AICPDelta G Consulting Engineers, Inc.GM2, Inc.Lambert AdvisoryNational Data & Surveying Services, Inc. (NDS)Nutting Engineers of Florida, Inc.US Utility Potholing & Air ExcavationDiaz-Murphy & Associates CES, LLC (DMA)Requirement from Scope for Construction Engineering & Inspection (CEI) Services Contract administration and inspection X X X X X X X X X Materials sampling and testing X Employ at least one professional engineer, registered with the Florida State Board of Professional Engineers, having training and experience in the area of Construction Engineering Inspection. X X Cost estimates for work must be provided X X X Inspection of Construction Projects Including but not limited to Structural, Building, Plumbing, Mechanical, Electrical, Roofing in Accordance with the requirements of the applicable Building Codes. with State Law X X X X X X X X X Requirement from Scope for Professional Grant Writing The development, preparation, and writing of grant proposals to secure funding from government entities, foundations, and other funding organizations X X X X Research and identification of grant opportunities X X Strategic planning for funding acquisition X Preparation of narratives and budgets X X Submission of proposals X X Assistance with grant administration and reporting requirements X X X X X X X Requirement from Scope for Construction/Project Management/ Administration Administration and management of construction contracts and City procedures for successful completion of various capital projects including, but not limited to, buildings, parks facilities, roadways, bridges, waterways, transportation and traffic engineering projects, and other City projects as needed. X X X X X X X X X X X X X Pre-construction services X X X X X X X X X Cost estimating X X X Plan review and comments X X X X X X X X X X Constructability input on the design of a project X X X X X X Construction administration services during the bidding, scheduling, construction and close out of assigned construction projects X X X X X X X X Familiar with current Federal/State/County and local regulations, policies, processes X X X X X X X X X X Knowledge and experience pertaining to grants administration, housing requirements, City codes, and administrative procedures X X X X X Minimum Qualification Requirement #1: Licensing Requirements Engineers: State of Florida Engineering license under Florida Statute 471 issued by the State of Florida Department of Business and Professional Regulations. X X X X X X X X X X X X Although not required, proposers should indicate if they have at least one (1) team member accredited in the united states green building council leadership in energy and environmental design (LEED). X X Surveyors and Mapping: Consultants applying for this discipline must be licensed by the Florida Department of Agriculture and Consumer Services (FDACS) licenses under Florida Statute 472.007. X Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 19 Below, you will find a list of all the services available to render to the City as it relates to this RFQ. For more specifics about our capabilities and experience in these services, please see our write-ups in the Demonstration of Qualifications section earlier in Tab 2 and the Project List section later in Tab 2. As Prime: • Landscape Architects • General Civil Engineers • Surveyors and Mapping • Transportation/Transit/Traffic Engineering • Construction Engineering & Inspection (CEI) Services • Professional Grant Writing • Construction/Project Management/Administration Understanding of Issues The CGA team has engineering knowledge and experience working in South Florida barrier islands with aging infrastructure and sea level rise. The team understands that the City has areas that need infrastructure upgrades to support the sea level rise, redevelopment, and has areas that simply are approaching their useful life and require proper upgrades and/or maintenance. These types of improvements/upgrades require the City to prepare their capital improvement plans, infrastructure, codes, and staff. The CGA Team has familiarized themselves with the City’s goals to foster sustainable growth, expand and upgrade aging infrastructure, and improve transportation mobility and connectivity for all users. We have identified numerous projects that are very similar in nature to our successful past projects with the city and other municipalities and have included the relevant information in our submittal package. Understanding of Tasks The tasks encompassed within this continuing contract pertain to municipal projects where individual construction costs do not exceed the statutory threshold of $7.5 million, and study activities where individual fees do not exceed $500,000. CGA understands that work will be assigned on an as-needed basis via specific task orders, requiring seamless coordination, technical excellence, and strict adherence to local, state, and federal regulations. The relevant tasks can be categorized as follows: • Facilities, Lands, and Buildings: Providing designs, condition assessments, space planning, and ADA compliance for municipal buildings, parks, and facilities. • Roadway & Drainage Improvements: Executing general civil and street engineering tasks, including roadway design, stormwater management, conversion of stormwater wells to pressurized wells with added pumps, water distribution systems, and wastewater collection systems. CGA was Engineer or Record for a recently completed City stormwater pump station rehabilitation project in the Golden Shores neighborhood. • Parks and Open Space (Landscape Architecture): Delivering sustainable landscape architecture, active and passive park design, beach and dunescaping, irrigation design, and urban design plans utilizing Florida-friendly landscaping principles. • Emergency & Grant Support: Assisting the City with addressing Public Law 84-99 (Flood Control and Coastal Emergency Act) assessments, emergency funding support following storm events, and coordination with regulatory agencies such as DERM, FDEP, and the Army Corps of Engineers (ACOE). • Multimodal Planning & Traffic Operations: Conducting transportation planning, complete streets design, corridor studies, parking demand evaluations, traffic impact studies, signal timing optimization, and Intelligent Transportation Systems (ITS) planning. • Interagency Coordination: Maintaining continuous liaison and collaboration with Miami-Dade County Transit, the Metropolitan Planning Organization (MPO), the Florida Department of Transportation (FDOT), and local community organizations. • Field Inspection & Materials Testing: Providing rigorous contract administration, site inspections, and materials sampling and testing covering structural, building, plumbing, mechanical, electrical, and roofing disciplines. • Grant Writing & Project Management: Assisting City staff with professional grant writing, pre-construction services, cost estimating, constructability reviews, and comprehensive project administration from bidding through closeout. Project Execution Methodology: Phased Deliverables To ensure systematic quality control and alignment with City expectations, CGA approaches each assigned task through a structured, five-phase delivery model: • Phase 1: Study and Report: Reviewing regulatory requirements, evaluating alternative solutions, preparing a comprehensive findings report, and establishing a detailed estimate of Total Project and Construction Costs. • Phase 2: Preliminary Design: Developing preliminary design documents, final design criteria, outline specifications, and updated cost estimates for formal review and acceptance by City staff. • Phase 3: Final Design / Construction Documents: Producing complete working drawings, technical specifications, and permit application support documents across all required engineering and architectural disciplines, complete with reviews at milestone stages (30%, 60%, 90%, and 100%). • Phase 4: Permitting, Bidding, and Negotiation: Assisting the City through pre-bid conferences, issuing necessary addenda, evaluating contractor bids, and securing all required local, county, and state permits. • Phase 5: Construction Administration Services: Guarding the City against defects and deficiencies, reviewing contractor applications for payment, evaluating change orders, responding to Requests for Information (RFIs), and delivering accurate as-built CADD drawings upon project completion. Through this task understanding, CGA commits to serving as a trusted, proactive extension of the City’s staff, ensuring every project is executed efficiently, within budget, and to the highest standards of professional quality. Schedule of Proposed Services Via Sub-Consultants: • Mechanical, HVAC & Plumbing Engineers • Structural Engineering Services • Financial, Economic, and Rate Studies • Traffic Data Collection • Geotechnical Engineering • Subsurface Utility Exploration (SUE) • Materials Sampling and Testing Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 20 Project List CGA is proud to present descriptions of our projects either complete or underway, that are located in Miami-Dade, Broward, or Palm Beach Counties. We are entirely confident that these project descriptions illustrate that we not only meet, but exceed, the requirements listed in both the Scope of Services and MQRs for all disciplines upon which we are bidding. Here is the order in which our Project List is laid out: • Below, we present a list of projects to demonstrate we have experience working with the regulatory agencies listed in the MQRs. • Starting on the following page, we present general data sheets about some of our most relevant, long-term clients. • Following the general data sheets, you will find sheets that depict specific projects for relevant clients. Experience Working with Florida Regulatory Agencies CGA has provided numerous projects permitted through organizations listed in the RFQ. Specific projects and other details are listed below. Miami-Dade County Department of Transportation and Public Works (DTPW), which includes the Traffic Engineering Division and the Highway Construction and Engineering Division • Miami-Dade County, FL - Underline Phase 3 - separate contracts awarded by DTPW (1. Landscape Review and Arborist Services and 2. CEI Services) • City of Miami Beach - Pedestrian Priority Zone Project on Lincoln Road - permitting through DTPW Florida Department of Transportation (FDOT) Several of our proposed CEI team members have valid FDOT certifications, including Erik Padron, PE, MSCE (CGA’s proposed CEI Team Lead). CGA’s clients include FDOT Districts 1, 4, 6 & 7. There are descriptions of representative FDOT projects throughout the proposal, including in the general data sheets and specific project sheets on the following pages. Here are some additional projects not included as full sheets: • FDOT District 4: I-75 Alligator Alley Environmental Education Project • FDOT District 4: SR-848 Stirling Road from W Of N 58th Ave to US-1 • FDOT District 6: General Assigned Contract, including CA630; TWO #5; Project FM #445958-1-62-01 Department for Environmental Resources Management (DERM) • Bal Harbour Village, FL - Multiple Water Main and Sewer Improvements - DERM permit • Bal Harbour Village, FL - Yearly GIS Data Submittal to DERM • Village of Palmetto Bay, FL - Sub-Basin 57/96 - DERM permit Florida Department of Environmental Protection (FDEP) Nicholas Kanelidis, PE (CGA’s proposed General Civil Engineers Team Lead) is a licensed FDEP Stormwater, Erosion & Sedimentation Control Inspector (No. 40536). Additionally, CGA has FDEP experience from the following projects: • Bal Harbour Village, FL - Ongoing Professional Services - involves FDEP Annual Reporting for NPDES • Oleta River State Park in North Miami, FL - Continuing services FDEP contract for septic tank conversion project on these state-owned lands • Zachary Taylor State Park in Key West, FL - Overflow Parking Lot - permitted project through FDEP and SFWMD • City of Miami Beach - Middle Beach Recreational Corridor - FDEP Coastal Construction Control Line Permitting • City of Hallandale Beach, FL - Three Islands Reuse Water Pipeline - FDEP and the Broward County Environmental Resource Department permits were obtained for these improvements • City of Hallandale Beach, FL - Raw Water Pipeline - Permitting to FDEP and Broward County Highway Construction and Engineering Division (BCHCED) approved before project went out to bid • Town of Davie, FL - SW 30th St Reuse Water Main - Permitted through FDEP, Broward County, and Town of Davie Engineering Department • City of Wilton Manors, FL - NW 3rd Avenue Area Water Main Replacement, Phase I - Permitting responsibilities include coordination with FDEP, BCHCED, and Broward County Traffic Engineering Division Army Corps of Engineers (ACOE) CGA’s Otto Letzelter CFM, PE, SE, SI, BCA, SFPE, CFPS received Construction Management for Contractors Certificate from ACOE. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 21 Nova Drive Davie Road Phase II LAP Generator Replacement WTP Davie Master Lift Station # 8 and Force Main Town of Davie Professional Services (Ongoing) 6591 Orange Drive Davie, Florida 33314 Contact Information Jonathan Vogt Town Engineer Tel No.: 954.797.1137 Email: Jonathan_Vogt@davie-fl.gov Contract Amount: Multiple Contracts - specific contract information available upon further request from the Town. CGA has provided continuing professional services to the Town of Davie since 1996. Services span multiple departments and include: • Roadway, Traffic and Transportation Engineering • Land Development, Civil-Site and Drainage Systems. • Landscape Architect • Water and Wastewater • Utility Engineer • Surveying and Utility Locates • Construction Inspection • Traffic Engineer DRC Reviews Projects completed for the Town include: • Master Lift Station #8 • Davie Road Improvements Phase I, II, and III • Davie Road Phase I Bike Lanes (CIGP) • Davie Road Phase II Complete Streets • Davie Road Phase III Streetscape (MAP Broward) • College Avenue Improvements Phase I and II • Nova Drive Complete Streets • Bamford Park Artificial Turf Conversion • System III 30" Overhead Pipe Replacement • Lift Station #9 Rehabilitation • Lift Station #18 Rehabilitation • Generator Replacement - WTP/WWTP - System II/III • WTP Improvement • SW 30th Watermain Replacement • Bamford Park Reclaimed Water Improvement • SW 82nd Ave Sidewalk Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 22 Bath and Tennis WWTP Drying Bed Replacement Sunflower Townhomes Water Main Improvement WRF Disinfection and Compliance Upgrades City of Boca Raton (Ongoing) 1401 Glades Road Boca Raton, FL 33431 Contact Information Talia Garcia, PE Utility Services Engineering Manager Tel No.: 561.338.7307 Email: tgarcia@bocaraton-fl.gov CGA has provided continuing professional services to the City of Boca Raton since 2012. Services include: • Landscape Architecture • Environmental Engineering • Civil Engineering • Transportation Consulting • Surveying Services • Construction Project Management Contract Amount: Multiple Contracts - specific contract information available upon further request from the City. Projects completed for the City include: • Boca Bath and Tennis • Boca Utilities Guard House • Boca Sunflower Townhomes - Water Main Improvements • WWTP Drying Bed Replacement • Boca Sewer MH Replacements • Boca WWTP SFWMD Master Permit MOD Work Order No. 19 • Boca Palmetto Park Rd - SUE Services • Boca WRF Disinfection and Compliance Upgrades • Intersection of Palmetto Park Road and NE / SE 5th Avenue • Boca Eastern WM Upgrades • Boca El Rio Canal Aerial Utilities Crossing • Boca NW 2nd Ave Raw WM Relocation • Boca Generators 1-2-3 Assessments • Boca Concentrate PS Rehab Assessment Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 23 City of Miami Beach (Ongoing) 1700 Convention Center Drive Miami Beach, Florida 33139 Contact Information: Ariel Guitian Senior Capital Project Coordinator Tel No.: 305.673.6071 x 6732 Email: ArielGuitian@miamibeachfl.gov CGA has provided continuing professional services to the City of Miami Beach since 2004. Services include: • Civil Engineering • Environmental • Planning General • Construction Engineering Inspections (CEI) • Surveying • Landscape Architecture • GIS Services • Traffic Engineering Contract Amount: Multiple Contracts - specific contract information available upon further request from the City. Projects Completed for the City Includes: • Miami Beach North Shore Neighborhood • Block Beach Walk Construction • Electrical Power Distribution Design • Flagler Monument Solar Lighting • Miami Beach South Pointe Park – Pylon Lighting • Middle Beach Recreational Corridor Phase II • Middle Beach Recreational Corridor Phase III • All-Wheels Park Design Studies • North Shore Open Space Park • Police Department Emergency System Bidding and Construction Electrical ASA • Flagler Memorial Monument lighting ASA Update Electrical & Structural Plans • Beach Walk II Phase II – CEI • Middle Beach Phase III – Cultural Resources Assessment Survey • Police Department Roof Structural Analysis • Resiliency Code Consultant Services • Atlantic Way Width Redesign Modifications • NBOP Arborist Reports • Middle Beach Recreational Corridor Phase III – Arborist Reports • Police Department Electrical Assessment and Upgrades • Police Department Mechanical Plans for Generator Upgrades • Lummus Park/Indian Beach Park Survey – Middle Beach Recreational Corridor Phase III • Bay Drive Neighborhood Greenway • Urban Forestry Master Plan Middle Beach Recreational Corridor Phase 2 Police Station Electrical Assessment and Upgrades Middle Beach Recreational Corridor Phase 3 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 24 Weston Citywide Infrastructure Improvements Weston Citywide Infrastructure Improvements Peace Mound Park City of Weston Professional Services (Ongoing) 17200 Royal Palm Boulevard Weston, Florida 33326 Contact Information: Denise Barrett-Miller Director of Communications Tel No.: 954.385.2000 Email: DBarrett@westonfl.org CGA has provided continuing professional services to the City of Weston since 1996. Services include: • General Civil Engineering • Landscape Architecture • Planning • Traffic and Transportation Engineering • Surveying and Mapping • Construction Engineering Inspections (CEI) • Construction Administration • Environmental Engineering and Wetlands Management • Engineering and Building Department Permitting Support and Services Contract Amount: Multiple Contracts - specific contract information available upon further request from the City. Projects completed for the City include: • New City Hall and Public Works buildings • Traffic Signalization • Undergrounding the Electric Power on SR 84 • Infrastructure Improvements • Stormwater Drainage Improvements • Bicycle and Pedestrian Master Plan • Force Main Modeling & Improvements • Library Park • Peace Mound Park • Grant Writing and Administration • Manatee Isles Bike Lanes • Signal Warrant Analysis Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 25 Stormwater 42 Year CDBG CRA Parking Lot 203 NE 3rd Street SW Quadrant Drainage Improvements Three Islands Reuse Water Pipeline City of Hallandale Beach Professional Services (Ongoing) 630 NW 2nd Street Hallandale Beach, FL 33009 Contact Information Manga Ebbe Project Manager Tel No.: 954.597.3700 Email: MEbbe@hallandalebeachfl.gov CGA has provided continuing professional services to the City of Hallandale Beach since 2009. Services have spanned multiple City departments, including: • Assistance to the planning department for: review of site plans, traffic impact analysis reports, sewer capacity evaluations • Project contracts with the public works department for: stormwater, water, sewer, and reuse water designs • Assistance to the building department as-needed for plan review Contract Amount: Multiple Contracts - specific contract information available upon further request from the City. Projects completed for the City include: • NE Quadrant Drainage Improvements (HMGP) • Boundary Surveys • Medical Center Traffic Reviews • Icebox Culinary Center Traffic Reviews • SW Drainage Improvements (FEMA HMGP) • Three Islands Reuse Water Pipeline • Raw Water Pipeline • Hallandale Beach Regional Activity Center (RAC) • Hallandale Beach Stormwater 42 Year CDBG • Hallandale Beach Stormwater 47 Year CDBG • CRA Sustainable Parking Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 26 SW 25th Terrace Drainage Improvements Dania SE 2nd Ave. Dania Cove Park Dania Beach 5th Avenue Linear Park City of Dania Beach Professional Services (Ongoing) 1201 Stirling Road Dania Beach, Florida 33004 Contact Information Fernando Rodriguez Director of Public Services (at time of the projects) Tel No.: 954.924.6808 x 3740 Email: FRodriguez@daniabeachfl.gov CGA has provided continuing professional services to the City of Dania Beach since 1996. Services include: • General Engineering and Architectural Services • Miscellaneous Planning • Design and construction management projects, such as, but not limited to, buildings, facilities, parks, roadways, drainage, structural, electrical, traffic engineering, civil / site planning, water and sewer, and engineering, permitting, land use and zoning, construction management, and project management • Construction Engineering Inspections (CEI), Threshold Inspections • Plans Review, Right-of-Way Permits and DRC Review (Civil and Traffic) • Landscape Architecture • Assistance as and to City Engineer Contract Amount: Multiple Contracts - specific contract information available upon further request from the City. Projects completed for the City include: • Basin 5 Drainage Improvements Study • Dania Cove Park Rehabilitation and Shoreline Stabilization Project • Meadowbrook Pump Station and Phase I Stormwater Improvements • Lift Station #15 Rehabilitation • Dania Cut-off Canal Water and Sewer Subaqueous Crossing • Water Main Extension for Marina • Lift Stations 1, 2, 3, 6 & 7 Rehabilitation • SE 2nd Avenue Water Main Extension • Public Services Fuel Station Replacement • Precious Paws Dog Park • NW/SW 1st Street Visioning Plan • SW 25th Terrace Drainage Improvements Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 27 Bal Harbour CIP Projects Bal Harbour Civil Engineering Projects Bal Harbour Village Engineering Services (Ongoing) 655 96th Street Bal Harbour, Florida 33154 Contact Information: Mike Alvarez, CGC, PWLF Utility Compliance Officer Tel No.: 786.566.3562 Email: MAlvarez@balharbourfl.gov CGA has provided continuing professional services to the Bal Harbour Village since 2017. Services include: CGA began providing professional services to Bal Harbour Village in 2017. Currently, CGA has a Continuing Engineering Services Agreement with Bal Harbour Village in order to assist the Village in various design projects and plan review services. These services include Civil Engineering, Electrical Engineering, Surveying, GIS, and Construction Services. Contract Amount: Multiple Contracts - specific contract information available upon further request from the Village. Ongoing services for Bal Harbour Village: • Building Department Public Works Plan Review and Utilities Plan Review • Sunshine 811 Services – Manage Dig Tickets and Design Ticket Response • Florida Department of Environmental Protection – NPDES Annual Reporting, MDC MS4 TMDL Prioritization Plan and Assessment Plan • Miami-Dade County Department of Regulatory and Economic Resources Reporting – Sanitary Sewer System Modeling and Water Usage Reporting • GIS Database Verification and Updates – Water, Sewer, Drainage, and Site Lighting • Pump Station No. 1 Drainage Improvements – Project Management, Bidding, Engineering During Construction, and Construction Services • Phase-3(a) Infrastructure Improvements – Project Management, Civil Engineering Design, Bidding, Engineering During Construction, and Construction Services • Phase-2(b) Water Main Replacement – Project Management, Exploratory Investigation via Geotechnical Engineering and Subsurface Underground Exploratory • Park Dr. 16” WM Abandonment and Replacement Review – QA/QC of the design plans, Construction Services. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 28 • Planning • Environmental • Building 174th St Bridge Park Concept Sunny Isles Beach Pedestrian Bridge Emergency Seawall City of Sunny Isles Beach (Ongoing) 18070 Collins Avenue Sunny Isles Beach, FL 33160 Contact Information Susan Simpson Deputy City Manager Tel No.: 305.792.1706 Email: ssimpson@sibfl.net CGA has provided continuing professional services to the City of Sunny Isles Beach since 2009. Services have spanned multiple City departments, including: • Civil Engineering • Traffic Engineering • Surveying Contract Amount: Multiple Contracts - specific contract information available upon further request from the City. Projects completed for the City include: • Landscape Architecture - North Bay Road Pedestrian Bridge • Landscape Architecture - Pedestrian Overpass Study • Landscape Architecture - Pedestrian Park Feasibility Study • Engineering Plan Review for Site Plan Approval • Building and Right-of-Way Permitting • City Engineer (temporary during the recruiting and hiring process for a permanent City employee for this position) • Golden Shores Pump Station Rehabilitation • Traffic Engineering - Citywide Speed Study • Boundary Survey - FDOT Parcels 653 & 654 • Boundary Survey - 230 174th Street • Entry Signs Survey • Survey & Plat Reviews • Planning - North Town Center Overlay Re-Visioning • Environmental - Emergency Seawall CGA has also won awards for our work for the City. These awards include: • In 2020, CGA won ASLA Florida’s Conceptual Category Award of Merit for our 174th St Bridge Park Concept. • In 2021, CGA won ASLA Florida’s Urban Design Category Award of Merit for Sunny Isles Beach Pedestrian Bridge. Golden Shores Pump Station Rehabilitation City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 29 Client City of Coral Gables 2800 SW 72nd Avenue Miami, FL 33155 Contact Information at Time of Project: Grettel Duran Project Architect Tel: 305.460.5053 GDuran@coralgables.com Project Date 2019 - 2022 Services Provided Landscape Architecture Civil Engineering Surveying Hardscape Design Irrigation Design Renderings Firm’s Fees $ 69,655.00 Construction Cost $ 421,500.00 In 2019, Calvin, Giordano & Associates, Inc. was contracted by the City of Coral Gables to provide design services for one of the City’s parks, located just north of the main entrance to the Venetian Pool. The development of this new park space was to be partially funded by The Garden Club and dedicated to honor Mrs. Lamar Louise Curry, one of their most distinguished members. One of the tasks was to prepare a conceptual design for the park to incorporate a passive space for families with small children to wait while other family members visit the Venetian Pool. Several conceptual plan options were prepared for review by the City staff, and as a result, the final plan featured an open space play area, two shaded seating areas, two raised planter boxes, and a rock garden that will function as a water filtration system for the overspill water from the Venetian Pool. A diverse palette of tropical trees and flowering plant material was also selected and approved by the Garden Club. CGA’s Landscape Architecture staff assisted the City’s Project Management team with this effort by preparing detailed construction documents for the demolition, new site plan, landscaping, fencing, irrigation design, walkways, lighting, and water features in the park. CGA’s Civil Engineering staff developed plans for additional drainage and sidewalk/crosswalk improvements to further enhance the area surrounding the park. Permitting, bidding, and construction observation were also part of the contract. The scope of work for the project includes the following: 1) Updated tree and boundary survey of the space; 2) Conceptual master plan and renderings; 3) Budget of anticipated construction costs to accompany master plan concepts; 4) Two community meeting presentations with color rendered site plan and image boards; and 5) Preparation of construction drawings and providing bidding and construction services. The project was completed on June 7, 2022. LAMAR LOUISE CURRY PARK Coral Gables, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 30 Client City of Miami Beach 1701 Meridian Ave, 3rd floor, Miami Beach, FL 33139 Contact Information Ariel Guitian Senior Capital Projects Coordinator, Office of CIP 305.673.7071 x 4105 ArielGuitian@miamibeachfl.gov Project Date 2016 – 2025 Services Provided Landscape Architecture Civil Engineering Surveying Construction Administration Park Master Planning Resiliency Design Environmental Permitting Arch Visualizations & 3D Electrical Engineering Firm’s Fees $ 840,000.00 Construction Cost $ 10.3 Million Miami Beach issued a simple request: to re-design a park. Specifically, the Request for Qualifications stated that the work products for the North Beach Oceanside Park would include conceptual drawing(s), surveying, geotechnical, design development, estimate(s) of probable construction cost, construction documents, permitting, bidding/award, and construction administration services. Embedded within the expectations of the City was a critical design component – the final design must define a new identity for the North Beach community by tapping into and revealing established values and qualities present in the site. The resultant design took the densely-vegetated, 30-acre park and conceived it as a series of carefully orchestrated thresholds where park users will never feel secluded, inactive or unengaged. The design resulted in a necklace of ‘pods’ that operate as a spine to the project and serve to protect habitat and increase the City’s management of these natural resources. The walkways are scaled so that they foster continuous activities in potentially endless configurable ways and augments the opportunities for resiliency design by strengthening the dune, utilizing passive green infrastructure and LID stormwater management strategies. The project also incorporated a rebranding of the City’s established beachfront with an on-grade beachwalk destined to be a terminus to the City’s overall transportation infrastructure. The product developed for the park is one that will provide an immediate transformative quality for the North Beach Community, it will enhance cultural celebration, and it embodies the City’s values of good, environmental design and access to great public spaces. NORTH BEACH OCEANSIDE PARK Miami Beach, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 31 Client Village of Key Biscayne 88 West McIntyre Street Key Biscayne, FL 33149 Contact Information at Time of Project: Todd Hofferberth Director, Parks and Recreation Tel: 305.365.8900 x 1213 THofferberth@keybiscayne.fl.gov Project Date 2016 - 2023 Services Provided Landscape Architecture Civil Engineering Surveying and Mapping Urban Design Electrical Engineering Firm’s Fees $ 110,334.00 Construction Cost $ 2,100,000.00 (Estimated) CGA was approached by the Village of Key Biscayne to reimagine a lot outside of the Community Center that would inherently create a staple to the village. The CGA design team approached the project as a timeless design that would relate to its surrounding functions of government, recreation and open space and would communicate a continued, upscaled quality. The park’s main component includes a flexible open lawn area that becomes a ‘civic’ green space used for its versatility. The lawn area, outside of its passive day-to-day activity, can become a dynamic space that transforms into event space to hold concerts, food trucks, community fitness activities, and markets to support programming in the Community Center and serve as an economic driver to the area. Other park components include an artwork plaza, a custom pergola design that enhances the branding of the area, sculptural boulder elements, passive congregation areas, and a pump track. The project also included lush landscape improvements, site drainage, and site lighting. PARADISE PARK Key Biscayne, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 32 Client City of Plantation 401 NW 70th Terrace Plantation, FL 33317 Contact Information at Time of Project Brett Butler, PE, City Engineer Tel: 954.797.2282 bbutler@plantation.org Project Date 2017 - 2022 Services Provided Landscape Architecture Civil Engineering Surveying CEI Construction Administration Arborist Services Irrigation Design Electrical Engineering Firm’s Fees $ 654,725.00 Construction Cost $ 9,000,000.00 In 2017, CGA was awarded a contract by the City of Plantation to provide planning, design, and construction services for a complete re-construction of Pine Island Park as part of the City’s Parks Bond program. The major goals of the design of this park were to significantly improve the drainage and playability of the soccer fields, to enhance the experience of park users by providing new walkways, shaded seating areas, and a main entrance courtyard, and to improve ADA accessibility. Therefore, the proposed improvements to this highly used 24-acre soccer park, include the removal of the old existing parking lot, expansion and renovation of the new City- owned parking lot, two (2) new Parks & Recreation buildings, and re-grading of the site to accommodate six (6) natural grass soccer fields, one (1) main synthetic turf soccer field, and one (1) synthetic turf goalie practice area, as well as extensive sidewalk, lighting, and drainage improvements throughout the site. Some additional unique design features of the park include brick columns and an arched entryway into the park, an open-air pavilion for trophy presentations and special events, and a new, electronic messaging board and monument sign along Pine Island Road. CGA provided surveying, site planning, civil engineering, electrical engineering, landscape design, and irrigation design services for the project, as well as permitting, CEI, and construction administration. The park improvements were completed in June 2022. PINE ISLAND PARK - RECONSTRUCTION Plantation, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 33 Client Bal Harbour Village 655 96th Street Bal Harbour, FL 33154 Contact Information at Time of Project: Mike Alvarez, CGC, PWLF Utility Compliance Officer Tel: 305.993.7361 MAlvarez@balharbourfl.gov Project Date 2018 - 2021 Services Provided Civil Engineering Surveying Construction Administration Firm’s Fees $ 384,755.00 Construction Cost $ 2,000,000.00 CGA was retained by Bal Harbour Village to design and permit new water, sewer, and drainage infrastructure within its gated residential community. Curb replacement and regrading were also part of the scope. The purpose of the project was to replace infrastructure in disrepair, improve surface ponding, replace damaged curbing and asphalt, and to relocate water mains and meters to the front of properties for future maintenance access and monthly readings. Coordination played a major role with the affected residences in terms of temporary water shutdowns, maintenance of traffic, staging of equipment and materials, work on private property, and restoration. The project included over 3,000 LF of 4” and 10” water main inclusive of services, valves, hydrants, and fire lines, 700 LF of sanitary sewer with manhole structures and laterals, 600 LF of 15” drainage piping with new structures, 5,000 LF of curbing, and asphalt resurfacing. The majority of water services were relocations from the back to the front of each property, requiring horizontal directional drilling of new services within private property. Most water main was installed by a combination of pipe bursting and horizontal direction drilling. CGA’s role in the project included design, permitting, incorporating Geotechnical and Subsurface Utility Exploration (SUE) findings, bidding support services, coordinating and conducting a preconstruction meeting with all stakeholders, reviewing shop drawings, addressing Contractor RFI’s, conducting full-time inspections, overseeing testing, reviewing payment applications, managing the Contractor’s schedule, reviewing record drawings, closing permits, and final project certification. PHASE 3A INFRASTRUCTURE AND ROADWAY IMPROVEMENTS Bal Harbour, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 34 Client City of Hallandale Beach 630 NW 2nd Street Hallandale Beach, FL 33009 Contact Information at Time of Project: Manga Ebbe Project Manager Tel: 954.597.3700 MEbbe@hallandalebeachfl.gov Project Date 2017 - 2021 Services Landscape Architecture Civil Engineering Surveying Construction Services Electrical Engineering Environmental Services Geotechnical Firm’s Fees $ 782,395.00 Construction Cost $ 11,800,000.00 CGA completed the design and permitting for the stormwater project for the Hallandale Beach SW Quadrant Drainage Basin, which encompassed an area of approximately 330 acres. This tidally influenced basin is bounded by Hallandale Beach Boulevard, S Dixie Highway, SW 11th Street and SW 8th Avenue in the City of Hallandale Beach, FL. Land uses within the study area are primarily single-family residential. There are a number of drainage facilities within the project area with limited conveyance to the existing Schaffer Canal. The conveyance system is subject to the effects of tidal fluctuation. Consequently, at high tide there is virtually no head available to drain the basin. The lack of conveyance capacity within this system has led to multiple Severe Repetitive Loss (RL) properties and the complete inundation of the roadway system for extended periods during storm events of lesser frequency than that required by SFWMD. Using ICPR, CGA modeled and designed an improved drainage system conveying water to a new duplex pump station located in the Schaffer Canal which is connected to a total of 17 deep injection drainage wells. The new wells are pressurized with 15 feet of head in order to produce the necessary discharge into the G-III aquifer. Additionally, as part of the permitting requirements, a complex monitoring system will be installed to allow for real time review of pressure data at each drainage well along with monitoring wells installed within the project area to record ground water levels. The existing gravity outfall will be modified with the installation of four (4) “backflow” flap gates in a control structure at the downstream ends of the gravity system. The flap gates are designed to stop the tidal water from flowing back into the gravity system at higher tides. The project was permitted through FDEP and the Broward County Environmental Protection and Growth Management Division. A large generator was constructed for the pump station to allow for continuous operation even during power outages. The permanent generator, which is set above FEMA flood elevations, was wrapped with a nature design to help blend with the neighborhood. The pump station and control structures were finished with native plantings to blend with the surrounding neighborhood. CGA, in conjunction with the City of Hallandale Beach, worked with FEMA to get an expansion approved for the existing HMGP grant. The expansion was approved to provide over $22 million in funding for this project and another project for the adjacent neighborhood. SW QUADRANT DRAINAGE IMPROVEMENTS (FEMA HMGP) Hallandale Beach, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 35 Representative Client City of South Miami 6130 Sunset Drive South Miami, FL 33143 Representative Contact Information at Time of Project Alex Muñoz Director of Public Works & Capital Improvements Tel: 305-403-2078 Email: Alex.Munoz@SoMiFL.gov Project Date Ongoing Services Provided NPDES Permitting Firm’s Fees Multiple Contracts - Task Order Based Construction Cost N/A CGA provides multiple municipalities engineering and permitting services by compiling and submitting the National Pollution Discharge Elimination System (NPDES) annual report to State of Florida Department of Environmental Protection (FDEP) on the behalf of the municipality to demonstrate compliance with the FDEP NPDES Municipal Separate Storm Sewer System (MS4) Program. The FDEP Interlocal Agreement under Phase I MS4 Permit No. FLS000003-004 permits Miami-Dade County (MDC) to monitor surface waters within various MDC municipalities. CGA extrapolates the data from the annual water quality data received from MDC to assess the water quality within the area. CGA includes the water quality report specific to the municipality, as require by FDEP, with the tabular portion of the report to complete the NPDES submission. When asked, CGA provides assistance to municipalities for the NPDES audits conducted by FDEP to confirm that the information provided in the annual report is consistent with the supporting documentation in the municipal records. CGA can assist in the review of the Standard Operating Procedures (SOP) upon which the NPDES reporting is based. Additionally, we can prepare forms for municipalities to track NPDES activities that are done throughout the year, such as: • Inspections of the stormwater management system infrastructure • Street sweeping • Plan review • Construction site inspections • Permitting NPDES compliance experience in the past 10 years: • City of Sunny Isles Beach, FL • City of South Miami, FL • Bal Harbour Village, FL • City of Pembroke Pines, FL NPDES PERMIT COMPLIANCE Various Clients Throughout South Florida City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 36 Client City of Boca Raton 1404 Glades Rd Boca Raton, FL 33431 Contact Information at Time of Project: Talia Garcia, PE Utilities Engineering Manager (561) 239-6292 tgarcia@bocaraton-fl.gov Project Date 2024 – Ongoing Services Provided Civil Engineering Survey Geotechnical (Subconsultant) SUE (Subconsultant) Firm’s Fees $ 126,764.25 Construction Cost $ 1,963,584.60 (estimated) There is a small neighborhood in the northeast section of the City that is still utilizing septic tanks for wastewater discharge. Therefore, the City elected to construct municipal sanitary sewer infrastructure for future conversions from septic. Also, the existing potable water infrastructure within the project limits has reached its useful service life and needs to be replaced. The overall project includes approximately 1,800 linear feet of water main and 2,600 linear feet of sanitary sewer. Additionally, a Developer is currently preparing plans to construct a new building on the west side of the project limits. Part of the City’s agreement with the Developer is to have them design and construct a portion of the sanitary sewer main along with a new lift station. Therefore, CGA, the City, and the Developer had to coordinate the design of both projects. In addition to the services listed in the column to the left, CGA’s scope includes preparing design plans, permitting, and bidding services. A1A AREA WATER AND SEWER Boca Raton, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 37 Client City of Hallandale Beach 400 South Federal Highway Hallandale Beach, FL 33009 Contact Information at Time of Project: Joselaine Pateau Engineer I Public Works Tel: 954.457.1607 jpateau@hallandalebeachfl.gov Project Date 2021 – Ongoing Services Provided Civil Engineering Survey Construction Administration Geotechnical (Subconsultant) SUE (Subconsultant) Firm’s Fees $ 42,945.00 Construction Cost $ 293,000.00 CGA was retained by the City of Hallandale Beach to design, permit, and provide construction administration services for a federally funded grants project that includes stormwater and ADA improvements within a residential neighborhood. Areas within the project limits experience significant ponding after a rain event due to lack of storage and positive discharge. Additionally, there are several ADA non-compliant sidewalks. The scope includes approximately 140 linear feet of exfiltration trench, catch basins, roadway reconstruction, sidewalk replacement, swale re-grading, and driveway reconstruction. CGA is currently under contract to provide construction administrative services that include reviewing shop drawings, responding to RFIs, part-time inspections, reviewing as-builts, and final permit closeouts. CDBG 47 (NW 10TH ST DRAINAGE AND ADA IMPROVEMENTS) Hallandale Beach, FL After ImprovementsBefore Improvements City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 38 Client Broward County 115 S Andrews Avenue Fort Lauderdale, FL 33301 Contact Information at Time of Project: Carolina Vargas, PE Project Manager 954.577.4572 CVargas@broward.org Project Date 2022 - 2025 Services Provided Traffic Engineering Civil Engineering Landscape Architecture Surveying and Mapping Electrical Engineering Firm’s Fees $ 125,559.12 CGA provided design services for improvements for the signalized intersection at Las Olas Boulevard and SE 3rd Avenue in the City of Fort Lauderdale. The project involved replacing the existing span wire traffic signal system with a new mast arm traffic signal system. The scope of work included milling and resurfacing the intersection and approaches, ADA upgrades, signalization improvements, intersection lighting analysis, structural support systems including foundations, signing and pavement markings, records research, surveying and mapping (control and basemap), utility coordination, subsurface utility engineering, permitting, and soil borings. LAS OLAS BOULEVARD AND SE 3RD AVENUE SIGNALIZATIONS Fort Lauderdale, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 39 Client Town of Davie 8800 SW 36th St Davie, FL 33328 Contact Information at Time of Project: Jonathan Vogt Town Engineer (954) 797-1137 Jonathan_vogt@davie-fl.gov Project Date 2018 - 2022 Services Provided Traffic Engineering Civil Engineering Landscape Architecture Surveying and Mapping Construction Services Firm’s Fees $ 460,000 Construction Cost $ 6,300,000 The Nova Drive complete streets improvements project (from Davie Road to University Drive) included upgrading the existing two-lane roadway with new turn lanes, driveway access, bike lanes, new landscaped medians and roadway intersection improvements. The project also featured a new roundabout design as a way to improve access into two large communities, and also as a traffic calming measure. CGA also assisted Town of Davie staff with securing partial funding for the project through FDOT and Broward County. The addition of the left turn lanes and intersection improvements greatly increased the functionality and traffic flow through the heavily used corridor. While the new planting of shade trees, flowering trees, and palms along with colorful new ground covers significantly improved the aesthetic quality of the roadway, and added utilize plan reviewers, to the wooded character of the surrounding neighborhoods. CGA staff prepared surveys, traffic studies, conceptual designs, final design plans, cost estimates, construction drawings, and bid documents for the project. One of the biggest challenges that the design team had to overcome was providing enough drainage for the new improvements and expansion of the roadway in some areas within a very small R.O.W. area. The CGA team came up with a solution that combined 75 new structures and piping, with over 2,500 LF of exfiltration trench and the regrading of all the existing swale areas to achieve the drainage capacity that was needed for the project. This drainage design was then permitted through four different local agencies. NOVA DRIVE COMPLETE STREETS IMPROVEMENTS Davie, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 40 Client City of Miami Beach 1700 Convention Ctr Dr Miami Beach, FL 33139 Contact Information at Time of Project: Ghassan Chouery Senior Transportation Engineer 305.673.7000 X26064 ghassanchoueiry@miamibeachfl.gov Project Date 2023 - 2025 Services Provided Traffic Engineering Firm’s Fees $ 92,050.00 The City of Miami Beach (City) retained CGA to conduct a traffic safety study in the Sunset Harbour Neighborhood in response to neighbors’ concerns about safety issues such as speeding, visibility obstructions, and pedestrian crossings at undesignated locations. Moreover, the neighborhood Homeowners Association (HOA) prepared a letter for the City. The study aimed to analyze the current traffic conditions in Sunset Harbour Neighborhood in the City to address speeding, visibility obstructions, and pedestrian crossings at undesignated locations, in order to formulate actionable recommendations for improving overall traffic safety and efficiency. The study was submitted to the City in August 2024. After review, additional data and analysis were requested by the City to include additional pedestrian data along 20th Street (west of Bay Road), northern portion of Sunset Harbour Drive, and West Avenue. In addition, vehicular volume and speed data were collected along 20th Street, the northern portion of Sunset Harbour Drive, and West Avenue. Turning movement counts (TMC) were collected at Sunset Harbour Drive & 18th Street, Bay Road & 18th Street, and West Avenue & 18th Street. The data were collected in April 2025 and included in the pedestrian, vehicular, and operational analysis. SUNSET HARBOUR NEIGHBORHOOD TRAFFIC STUDY Miami Beach, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 41 Client City of Miami Beach 1700 Convention Center Drive Miami Beach, FL 33139 Contact Information at Time of Project: Ghassan Choueiry Project Manager 305-673-7000 x26064 ghassanchoueiry@miamibeachfl.gov Project Date 2024 - 2025 Services Provided Traffic Engineering Traffic Design Firm’s Fees $ 191,639.00 CGA was retained by the City of Miami Beach to provide traffic engineering and design services for multimodal improvements along Lincoln Road Mall and within Flamingo Park. The primary assignment consisted of the preparation of construction plans for pedestrian, bicycle, accessibility, and roadway improvements, including high-emphasis crosswalks, ADA-compliant curb ramps, bicycle parking facilities, raised crosswalks, signing and pavement markings, drainage improvements, and associated roadway modifications. Engineering services included topographic surveying, utility coordination, geotechnical investigations, preparation of conceptual, 60%, 90%, 100%, and final signed and sealed plans, engineer’s opinions of probable construction cost, technical specifications, Miami- Dade DTPW permit approval, and bid document preparation. As part of the project, CGA also performed a Leading Pedestrian Interval (LPI) warrant study that included vehicular and pedestrian data collection, crash history analysis, field investigations, operational evaluations in accordance with the Florida Department of Transportation (FDOT) Traffic Engineering Manual (TEM) and the Manual on Uniform Traffic Control Devices (MUTCD), and the development of operational recommendations to support LPI implementation. PEDESTRIAN PRIORITY ZONE Miami Beach, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 42 Client City of Weston 17200 Royal Palm Blvd Weston, FL 33326 Contact Information at Time of Project: Denise Barrett-Miller Director of Communications 954.385.2000 DBarrett@westonfl.org Project Date 2023 - 2025 Services Provided Traffic Engineering Firm’s Fees $ 42,306.02 Calvin, Giordano & Associates, Inc. (CGA) was retained by the City of Weston to complete a corridor study consisting of a pedestrian safety evaluation and an operational analysis of three (3) intersections along Emerald Estates Drive. The pedestrian safety study extended from approximately 250 feet west of The Palms at Weston (Senior Residential Community) access driveway to approximately 520 feet west of the signalized intersection at Weston Road. The pedestrian safety evaluation included an assessment of the need for a midblock pedestrian crossing in accordance with the criteria established in the 2024 Florida Department of Transportation (FDOT) Traffic Engineering Manual (TEM), a review of the most recent three years of available crash data, and an evaluation of existing operating speeds. The study also included the collection of vehicular and pedestrian traffic data, including 24-hour bi-directional traffic and speed counts, 4-hour Turning Movement Counts (TMCs), and 14-hour pedestrian crossing counts. EMERALD ESTATES DRIVE TRAFFIC STUDY Weston, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 43 Client Memorial Healthcare System 3501 Johnson Street Hollywood, FL 33021 Contact Information at Time of Project: Amany Solan Project Manager 954.265.8672 asolan@mhs.net Project Date 2024 - 2025 Services Provided Traffic Engineering Firm’s Fees $ 48,050.00 CGA was retained by Memorial Healthcare System (MHS) to prepare a Traffic Impact Study for the Memorial Regional Hospital (MRH) Surgical & Critical Care Tower Expansion in the City of Hollywood, Florida. The study evaluated the operational impacts of the proposed expansion under existing, future no-build, and future build conditions through the anticipated project completion in 2030. The analysis included eight (8) study intersections and four (4) roadway segments surrounding the hospital campus. Operational evaluations were performed using Synchro 11 software in accordance with the methodologies of the 2010 Highway Capacity Manual (HCM) and the City of Hollywood’s requirements. The study included the collection of 24- hour turning movement counts, signal timing and phasing information, and field reviews of roadway geometry, lane configurations, pavement markings, and signage. The study evaluated the traffic impacts associated with approximately 2,258 additional daily trips generated by the project and developed operational improvements to mitigate identified deficiencies. Recommendations included intersection optimization, turn lane modifications, signal timing improvements, traffic control enhancements, and corridor operational improvements to maintain acceptable Levels of Service (LOS) throughout the study network. MEMORIAL REGIONAL HOSPITAL EXPANSION TRAFFIC STUDY Hollywood, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 44 Client Bal Harbour Village 655 96th Street Bal Harbour, FL 33154 Contact Information at Time of Project: Mike Alvarez Utility Compliance Officer 305-993-7436 malvarez@balharbour.gov Project Date 09/2025 – 11/2025 Services Provided Horizontal & Vertical Controls Topographic Survey Civil Engineering Design Firm’s Fees $ 46,993.00 Construction Cost $ N/A Bal Harbour Village (BHV) has requested professional Surveying, Civil Engineering, and Construction Administration services from Calvin, Giordano & Associates, Inc. (CGA) for the replacement and redirection of approximately 1,550 linear feet of sanitary sewer main. (refer to Location Map) Survey Task Establish on-site control with horizontal control referenced to State Plane Coordinate System, Florida East Zone (NAD83/90) and vertical control referenced to North American Vertical Datum of 1988 (NAVD 88). Topographic Survey performed in the project limits (as shown on Location Map). Data collection to include edge of pavements, sidewalks, curb-cuts, driveways, concrete, fences, and visible above ground utilities typically associated with storm drainage, sanitary sewer, potable water, electric, gas, telephone, cable television and any Subsurface Utility Engineering (SUE) locations marked by utility locators. CAMDEN DRIVE AND BAL CROSS DRIVE SANITARY SEWER Bal Harbour Village, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 45 Client Nutting Environmental of Florida, Inc. 1310 Neptune Drive Boynton Beach, FL 33426 Contact Information at Time of Project: Colin Henderson, P.E. Project Engineer 561-736-4900 Colinh@nefmail.com Project Date 10/2025 – 11/2025 Services Provided Horizontal & Vertical Controls Monitoring Well Location Firm’s Fees $ 1,906.44 Construction Cost $ N/A Survey Task Establish on-site control with horizontal control referenced to State Plane Coordinate System, Florida East Zone (NAD83/90) and vertical control referenced to North American Vertical Datum of 1988 (NAVD 88). Topographic Survey performed in the project limits (as shown on Exhibit B- Location Map). Data collection to include: Horizontal Location: State Plane Coordinates, Latitude and Longitude and inner well dimensions. Vertical Location: Top of monitoring well and Inner well elevations. FDEP GORE BUILDING – MONITORING WELLS Fort Lauderdale, FL Sunny Draft 1 V3 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 46 Client City of Fort Lauderdale 100 N. Andrews Ave Fort Lauderdale, FL 33301 Contact Information at Time of Project: Deborah Cueva Project Manager II 954-828-5807 dcueva@fortlauderdale.gov Project Date 03/2026 - 04/2026 Services Provided Horizontal & Vertical Controls Topographic Survey Civil Engineering Design Firm’s Fees $ 113,106.60 Construction Cost N/A The City of Fort Lauderdale (City) currently has a flooding issue within a roadway located just north of NW 57th Place between NW 57th Court and NW 57th Place (refer to Exhibit B – Location Map). There is no existing infrastructure in this area except for two private catch basins. Therefore, rainwater has nowhere to percolate or discharge. Since the surrounding neighborhood currently utilizes trenches for stormwater management, the project design approach would be to design additional exfiltration trench within the Project Limits (refer to Exhibit B – Location Map). Survey Task Establish on-site control with horizontal control referenced to State Plane Coordinate System, Florida East Zone (NAD83/90) and vertical control referenced to North American Vertical Datum of 1988 (NAVD 88). Topographic Survey performed in the project limits (as shown on Exhibit B- Location Map). Data collection to include edge of pavements, sidewalks, curb-cuts, driveways, concrete, fences, and visible above ground utilities typically associated with storm drainage, sanitary sewer, potable water, electric, gas, telephone and cable television. NW 57TH COURT & NW 57TH PLACE STORMWATER IMPROVEMENTS Fort Lauderdale, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 47 Client City of Miami Beach, FL 1700 Convention Center Drive Miami Beach, FL 33139 Contact Information at Time of Project: Carolina Zamora, Project Manager 1700 Convention Center Drive Miami Beach, FL 33139 786.575.1584 carolina.zamora@miamibeachfl.gov Project Date 2024 - Ongoing Services Provided CEI Firm’s Fees $ 574,193.00 Construction Cost $ 18,132,386.00 Project # 15624-03 This project takes place on Venetian Causeway, which crosses over Biscayne Bay and connects the City of Miami Beach with the City of Miami. The scope includes Horizontal Directional Drilling of HDPE 36” Water Main. 5300 LF and HDD HDPE 12” Force Main. 2,600 LF. The scope also includes Tie Ins, Fittings and Road Restoration to connect San Marco to San Marino, San Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. The project consists of setting multiple detours to excavate the road for an entry pit and an exit pit at the receiving end. The contractor installed a wire system to guide the pipe underground around bridge piles, utilities, and dealt with various soil conditions. The new pipe was to become the main line for the water and sewer. The lines connected to the existing main line, with the existing services, and provided redundancy within each island. Miami Beach, FL VENETIAN CAUSEWAY City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 48 Client City of Miami Beach, FL 1700 Convention Center Drive Miami Beach, FL 33139 Contact Information at Time of Project: Carolina Zamora, Project Manager 1700 Convention Center Drive Miami Beach, FL 33139 786.575.1584 carolina.zamora@miamibeachfl.gov Project Date March - November 2023 Services Provided CEI Firm’s Fees $ 105,075.06 Construction Cost $ 239,534.75 Project # 20-125-06 Shoreline Foundation - Continuing Services Contract The work consisted of installing a new seawall over an existing wall with plumb and batter precast concrete piles and pre-cast structural wall panels at Jefferson Avenue on the Collins Canal in Miami Beach. The environment is extremely aggressive, so all reinforcing steel was hot dipped galvanized. The scope included rubble rip rap, a cast-in-place concrete wall cap with backfill and concrete filled gaps. It also included demolition, repairs, and modification to existing adjacent seawall, and manatee grates. Plus, vibration testing and set verifications, tree and mangrove removal, repair or replacement of existing utilities or irrigation, lighting adjustment, drainage, sidewalk, curb, and resurfacing. Contractor cast the walls on site. There was limited workspace available. Contractor worked from land and barge. Crossing utilities made the installation complicated and plans were revised to adjust the paneling for them. Contractor used commercial divers to verify installation of walls around utilities and remove any issues with jetting of piles. Miami Beach, FL JEFFERSON SEAWALL During Construction After Construction City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 49 Client City of Miami Beach, FL 1700 Convention Center Drive Miami Beach, FL 33139 Contact Information at Time of Project: Carolina Zamora, Project Manager 1700 Convention Center Drive Miami Beach, FL 33139 786.575.1584 carolina.zamora@miamibeachfl.gov Project Date January - June 2024 Services Provided CEI Firm’s Fees $ 83,498.65 Construction Cost $ 167,510.62 Project # 2023-309-LB This project consisted of the bridge rehabilitation of Henedon Avenue Bridge #876821, over Biscayne Point Waterway in Miami Beach. Scope included repairing deck top and roadway deficiencies, including spall repairs on abutments, bents, beams, and throughout spans, and repairing exposed re-bar. Repairing longitudinal, transverse, and multi- directional cracks throughout the entire bridge. Repairing spalls and cracks on piles, using pile jackets. Cleaning corrosion and painting metal attachments on timber planks. Replacing expansion joints and signs. Repairing and replacing concrete deck, sidewalk and curb. Deck repairs required MOT full lane closures for concrete removal and curing. Overwater work required full environmental turbidity and debris containment. Time was extended four weeks, 18%, due to the additional spalling and cracking not included in the plans. Miami Beach, FL HENEDON AVENUE BRIDGE REPAIR City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 50 Client City of Miami Gardens, FL 18605 NW 27th Avenue Miami Gardens, FL 33056 Contact Information at Time of Project: Tom Ruiz, Director of Public Works 786.279.1260 truiz@miamigardens-fl.gov Project Date 2018 - 2020 Services Provided CEI Firm’s Fees $ 938,129.88 Construction Cost $ 17,857,125.00 Project FM#44858-1-58-01 / 440858-2-54-01 (Design-Build) Project consisted of the construction of a pedestrian bridge over the Turnpike exit ramp, a pedestrian bridge over NW 199 Street, and two tunnels under Don Shula Drive in Miami Gardens. The scope of work included Drainage improvements; Erosion control; Pile foundations; MSE walls; Erosion control; Lighting; Future signalization improvements; Signage and pavement markings; Pre-cast concrete; Curb and gutter; ADA sidewalk/ramp reconstruction; Landscaping, sod, and irrigation; Temporary traffic control; Parking lot modification/resurfacing; Striping; and Signing. The scope also included pre-stressed, pre-cast concrete tunnel segments, excavation, coffer dam with steel sheet piles, dewatering, concrete, barrier wall, electrical, lighting, drainage and pumps. The CEI team managed the entire Design-Build project. This included tracking the plan design progress, verifying the plans were reviewed, participating in the plan review for design and constructability concerns. The team also managed the heavy construction by keeping the contractor on time and visiting the suppliers to verify delivery and quality prior to arrival on site. Construction was completed prior to 2020 Superbowl. Miami Gardens, FL HARD ROCK STADIUM PEDESTRIAN BRIDGES AND TUNNELS (FHWA FUNDED) City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 51 Client City of Miami Lakes 6601 Main St Miami Lakes, FL 33014 Contact Information at Time of Project: Anaily Padron, PE 305.364.6100 ext. 1133 padrona@miamilakes-fl.gov Project Date 2022 - 2023 Services Provided CEI Firm’s Fees $ 177,297.92 Construction Cost $ 1,388,574.88 Project # 2021-43 Work Order # 144858-1-58-01 / 440858-2-54-01 This project consisted of drainage construction in the neighborhoods of Alameda and West Lakes in Miami Lakes. The scope consisted of installation of French Drain, inlets, curb, driveways, and ADA sidewalks. The road was rebuilt, and the neighborhoods were resurfaced. A project challenge involved resolving the large number of utilities crossing the drainage mainline. The CEI team closely worked with the Town and the Contractor to resolve many field conflicts and help resolve extra change order costs. ALAMEDA / WEST LAKES DRAINAGE IMPROVEMENTS Miami Lakes, FL Name of Client Services Provided*Dates Contract Amount City of Sunny Isles Beach, FL Professional Services 2009 - Ongoing Multiple Contracts - Task Order Based. Bal Harbour Village, FL Professional Services 2015 - Ongoing Multiple Contracts - Task Order Based. City of Miami Beach, FL Professional Services 2004 - Ongoing Multiple Contracts - Task Order Based. Village of Palmetto Bay, FL Professional Services 2016 - Ongoing Multiple Contracts - Task Order Based. Village of Miami Shores, FL Professional Services 2022 - Ongoing Multiple Contracts - Task Order Based. City of North Miami, FL Professional Services 2011 - Ongoing Multiple Contracts - Task Order Based. City of Miami Gardens, FL Professional Services 2015 - Ongoing Multiple Contracts - Task Order Based. City of Weston, FL Professional Services 1996 - Ongoing Multiple Contracts - Task Order Based. Town of Davie, FL Professional Services 1996 - Ongoing Multiple Contracts - Task Order Based. City of Dania Beach, FL Professional Services 1996 - Ongoing Multiple Contracts - Task Order Based. City of Hallandale Beach, FL Professional Services 2009 - Ongoing Multiple Contracts - Task Order Based. City of Oakland Park, FL Professional Services 2011 - Ongoing Multiple Contracts - Task Order Based. City of Pembroke Pines, FL Professional Services 1991 - Ongoing Multiple Contracts - Task Order Based. City of Fort Lauderdale, FL Professional Services 2011 - Ongoing Multiple Contracts - Task Order Based. Town of Hillsboro Beach, FL Professional Services 2017 - Ongoing Multiple Contracts - Task Order Based. Broward County, FL Professional Services 2014 - Ongoing Multiple Contracts - Task Order Based. City of Margate, FL Professional Services 2018 - Ongoing Multiple Contracts - Task Order Based. City of Wilton Manors, FL Professional Services 2017 - Ongoing Multiple Contracts - Task Order Based. City of Lauderdale Lakes, FL Professional Services 2016 - Ongoing Multiple Contracts - Task Order Based. City of North Lauderdale, FL Professional Services 2018 - Ongoing Multiple Contracts - Task Order Based. Palm Beach County, FL Professional Services 2009 - Ongoing Multiple Contracts - Task Order Based. Palm Beach Gardens, FL Professional Services 2020 - Ongoing Multiple Contracts - Task Order Based. Town of Jupiter, FL Professional Services 2007 - Ongoing Multiple Contracts - Task Order Based. Town of Mangonia Park, FL Professional Services 2007 - Ongoing Multiple Contracts - Task Order Based. City of Boca Raton, FL Professional Services 2012 - Ongoing Multiple Contracts - Task Order Based. City of Stuart, FL Professional Services 2019 - Ongoing Multiple Contracts - Task Order Based. City of Oak Hill, FL Professional Services 2021 - Ongoing Multiple Contracts - Task Order Based. List of All Commercial Clients Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 52 Over the years, CGA has provided relevant services (including Landscape Architects, General Civil Engineers, Surveyors and Mapping, Transportation/Transit/Traffic Engineering, Construction Engineering & Inspection (CEI) Services, Professional Grant Writing, Construction/Project Management/Administration, and more) to dozens of municipalities and counties throughout South Florida and beyond. Below, you will find a list of all of CGA’s current commercial clients. CGA’s Sunbiz Registry from Sunbiz.org Proof of Occupational License Registration CGA’s DBPR Registries Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 53 CGA’s FDACS Surveyor and Mapper Business Organization License CGCGA’s DBPR Registries (Continued) Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 54 CGA’s Business Tax Receipt BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT 115 S. Andrews Ave., Rm. A-100, Ft. Lauderdale, FL 33301-1895 – 954-357-4829 VALID OCTOBER 1, THROUGH SEPTEMBER 30, Receipt #: Business Name: Business Type: Owner Name: Business Opened: Business Location: State/County/Cert/Reg: Exemption Code: Business Phone: Rooms Seats Employees Machines Professionals For Vending Business Only Number of Machines: Vending Type: Tax Amount Transfer Fee NSF Fee Penalty Prior Years Collection Cost Total Paid THIS RECEIPT MUST BE POSTED CONSPICUOUSLY IN YOUR PLACE OF BUSINESS THIS BECOMES A TAX RECEIPT WHEN VALIDATED Mailing Address: This tax is levied for the privilege of doing business within Broward County and is non-regulatory in nature. You must meet all County and/or Municipality planning and zoning requirements. This Business Tax Receipt must be transferred when the business is sold, business name has changed or you have moved the business location. This receipt does not indicate that the business is legal or that it is in compliance with State or local laws and regulations. - BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT 115 S. Andrews Ave., Rm. A-100, Ft. Lauderdale, FL 33301-1895 – 954-357-4829 VALID OCTOBER 1, THROUGH SEPTEMBER 30, Receipt #: Business Name: Business Type: Owner Name:Business Opened: Business Location: State/County/Cert/Reg: Exemption Code: Business Phone: Rooms Seats Employees Machines Professionals Signature For Vending Business Only Number of Machines: Vending Type: Tax Amount Transfer Fee NSF Fee Penalty Prior Years Collection Cost Total Paid 45.00 45.00 09/07/1999 09/07/1999 0.00 0.00 2025 2025 2025 45.00 45.00 0.00 0.00 Receipt # Receipt # 954-921-7781 954-921-7781 Paid Paid 45.00 45.00 ENGINEER (ENGINEER SURVEYOR OFFICE CORP) ENGINEER (ENGINEER SURVEYOR OFFICE CORP) BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT FT LAUDERDALE FT LAUDERDALE 1800 ELLER DR 600 1800 ELLER DR 600 0.00 0.00 CALVIN GIORDANO & ASSOCIATES INC CALVIN GIORDANO & ASSOCIATES INC DENNIS GIORDANO DENNIS GIORDANO 315-316 315-316 1800 ELLER DR 600 FORT LAUDERDALE, FL 33316 0.00 0.00 WWW-24-00288723 WWW-24-00288723 Receipt Fee 183 183 0.00 0.00 CALVIN GIORDANO & ASSOCIATES INC 45.00 2026 2026 2026 08/04/2025 08/04/2025 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 55 Form W-9 (Rev. March 2024) Request for Taxpayer Identification Number and Certification Department of the Treasury Internal Revenue Service Go to www.irs.gov/FormW9 for instructions and the latest information. Give form to the requester. Do not send to the IRS. Before you begin. For guidance related to the purpose of Form W-9, see Purpose of Form, below.Print or type. See Specific Instructions on page 3.1 Name of entity/individual. An entry is required. (For a sole proprietor or disregarded entity, enter the owner’s name on line 1, and enter the business/disregarded entity’s name on line 2.) 2 Business name/disregarded entity name, if different from above. 3a Check the appropriate box for federal tax classification of the entity/individual whose name is entered on line 1. Check only one of the following seven boxes. Individual/sole proprietor C corporation S corporation Partnership Trust/estate LLC. Enter the tax classification (C = C corporation, S = S corporation, P = Partnership) .... Note: Check the “LLC” box above and, in the entry space, enter the appropriate code (C, S, or P) for the tax classification of the LLC, unless it is a disregarded entity. A disregarded entity should instead check the appropriate box for the tax classification of its owner. Other (see instructions) 3b If on line 3a you checked “Partnership” or “Trust/estate,” or checked “LLC” and entered “P” as its tax classification, and you are providing this form to a partnership, trust, or estate in which you have an ownership interest, check this box if you have any foreign partners, owners, or beneficiaries. See instructions ......... 4 Exemptions (codes apply only to certain entities, not individuals; see instructions on page 3): Exempt payee code (if any) Exemption from Foreign Account Tax Compliance Act (FATCA) reporting code (if any) (Applies to accounts maintained outside the United States.) 5 Address (number, street, and apt. or suite no.). See instructions. 6 City, state, and ZIP code Requester’s name and address (optional) 7 List account number(s) here (optional) Part I Taxpayer Identification Number (TIN) Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid backup withholding. For individuals, this is generally your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the instructions for Part I, later. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN, later. Note: If the account is in more than one name, see the instructions for line 1. See also What Name and Number To Give the Requester for guidelines on whose number to enter. Social security number –– or Employer identification number – Part II Certification Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and 2. I am not subject to backup withholding because (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding; and 3. I am a U.S. citizen or other U.S. person (defined below); and 4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct. Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and, generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the instructions for Part II, later. Sign Here Signature of U.S. person Date General Instructions Section references are to the Internal Revenue Code unless otherwise noted. Future developments. For the latest information about developments related to Form W-9 and its instructions, such as legislation enacted after they were published, go to www.irs.gov/FormW9. What’s New Line 3a has been modified to clarify how a disregarded entity completes this line. An LLC that is a disregarded entity should check the appropriate box for the tax classification of its owner. Otherwise, it should check the “LLC” box and enter its appropriate tax classification. New line 3b has been added to this form. A flow-through entity is required to complete this line to indicate that it has direct or indirect foreign partners, owners, or beneficiaries when it provides the Form W-9 to another flow-through entity in which it has an ownership interest. This change is intended to provide a flow-through entity with information regarding the status of its indirect foreign partners, owners, or beneficiaries, so that it can satisfy any applicable reporting requirements. For example, a partnership that has any indirect foreign partners may be required to complete Schedules K-2 and K-3. See the Partnership Instructions for Schedules K-2 and K-3 (Form 1065). Purpose of Form An individual or entity (Form W-9 requester) who is required to file an information return with the IRS is giving you this form because they Cat. No. 10231X Form W-9 (Rev. 3-2024) Calvin, Giordano & Associates, Inc. 444 N Cleveland Ave, Ste 444 Loveland, CO 80537 6 5 0 0 1 3 8 6 9 CGA’s Completed W-9 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 56 TAB 3 Staffing CGA’s Landscape Architecture, Civil Engineering, Electrical Engineering, Urban Design, and Surveying Services - Paradise Park in Key Biscayne, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 58 Size Since 1937, CGA’s operations have grown from a two-person surveying firm in Hollywood, FL, to a corporation with approximately 600 employees. In 2018, CGA joined the SAFEbuilt family of companies, providing our clients with the stability and depth of resources of a national company with service delivery at a local level. CGA provides a comprehensive range of design professional services to municipalities throughout Florida. We leverage our extensive local knowledge alongside the broader capabilities of SAFEbuilt to deliver each client the highest levels of service, expertise, and resources. Due to our already strong presence in Florida, we can quickly and easily deploy qualified staff to support our on-demand contracts. Once assigned to a project, our team members remain dedicated to that project until completion. If any personnel changes occur during the life of the contract, CGA will immediately notify the City of the situation and will tap resources from nearby projects to temporarily support the City until a replacement is sourced, approved by the City, and on-boarded. In addition, as part of a nationwide family of companies, CGA has an exemplary depth of resources, including the ability to utilize both local and remote employees—literally from coast to coast. Over the decades, the capacity of SAFEbuilt, our parent company, has grown to 1,500+ employees who provide flexibility and economy of scale to 2,000+ clients nationwide. Because of these resources, CGA can utlize plan reviewers, inspectors, and more from the surrounding area to provide temporary surge support as needed. Our proposed team includes thirty-four (34) CGA employees. On the following page, we present an Organizational Chart, which illustrates the following: • The names of the employees in the area responsible for this contract • Their function in the company. • The name of the person who will be responsible for the coordination of work On the pages following the Organizational Chart, you will find the Resumes of each proposed CGA team member and Sub- Consultant, which detail their experience, qualifications, and satisfactory record. In the Appendix at the end of this document, you will find images of the licenses and certifications held by all of our esteemed proposed team (including our Sub-Consultants’ team members) that were not presented in the Minimum Qualification Requirements section in Tab 2. Size and Experience of Company Staff Pool Composition of the Staff Team Experience Both locally and statewide, CGA has a deep bench of professionals with relevant certifications and licenses issued by the State of Florida, including: • Professional Landscape Architect (PLA) • Certified Arborist (ISA) • Professional Engineer (PE) • Professional Surveyor and Mapper (PSM) • Professional Traffic Operations Engineer (PTOE) • Florida Stormwater Erosion and Sedimentation Control - Qualified Stormwater Management Inspector • Florida Department of Transportation Construction Training & Qualification Program (FDOT CTQP) • Florida Department of Transportation Temporary Traffic Control / Maintenance of Traffic (FDOT TTC/MOT) CGA currently has well over 100 government clients in Florida, including municipal, county, state, and federal organizations, as well as school districts and higher learning institutions. CGA’s vast experience working with local governments from the inside distinguishes us from other firms and allows us to consistently provide creative, practicable, and implementable solutions for our clients. This level of knowledge and experience in and of itself sets us apart from other consulting firms. LANDSCAPE ARCHITECTS Team Lead, Landscape Architect & Certified Arborist Michael Conner, PLA, ASLA, ISA Landscape Architect & LEED Professional Tammy Cook-Weedon, PLA, ASLA, LEED AP+C Landscape Architect & Head Landscape Designer Sophia Neves, PLA, ASLA Landscape Designer Valeriia Tolkacheva, PLA Irrigation Designer Marcos Mendoza Landscape Inspector/Plan Reviewer William “Bill” Tesauro GENERAL CIVIL ENGINEERS Team Lead & Civil Engineer Nicholas “Nico” Kanelidis, PE Engineering Plan Reviewer Heidi Belle Henderson, PE Water/Sewer Engineer James “Jimmy” Messick, PE Roadway/Stormwater Engineer Tingfeng “Ting” Zhao, EI Stormwater Engineer Seamus Quinn, EI NPDES Permit Tech & Civil Designer Rocco Diaz, EI CADD Technician Jessica Cano, BSCE TRANSPORTATION/TRANSIT/TRAFFIC ENGINEERING Team Lead & Traffic Engineer Pablo Chon Kan-Munoz, PE, PTOE Traffic Engineers Salman Rathore, PE Tingfeng “Ting” Zhao, EI Rocco Diaz, EI CADD Technicians Carlos Lemus Lee Rowbotham SURVEYORS & MAPPING Team Lead & Certified Surveyor & Mapper Steven M. Watts, PSM Survey Managers Robert “Bob” Vonderahe Kyle Peets CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES | CONSTRUCTION/PROJECT MANAGEMENT/ADMINISTRATION Team Lead, Director of CEI, Construction Project Manager & Construction Plan Reviewer Erik Padron, PE, MSCE CEI Senior Project Engineer Hugo DaSilva, PE, BSCE CEI Project Administator Carlos Rodriguez-Pagan, BSCE CEI Senior Inspectors Abdulreza “Reza” Shams, BSCE Juan Carlos Marin Mohammed Hedarian Leonardo Boza Lance Robinson Luis Rivera CITY OF SUNNY ISLES BEACHOrganizational Chart City's Project Manager PROJECT MANAGER Jenna Martinetti, PE ACCOUNT MANAGER Jeannie Walsh-Fabian PROFESSIONAL-IN-CHARGE David Stambaugh, PE, DBIA SUPPORT STAFF Electrical Engineer Jorge Cervantes, PE Grant & Housing Administrator Vickki Placide-Pickard Grant Writer Kenya Louidor Ordinances/Codes/Standards Specialist David “Dave” Dixon, AICP STRUCTURAL ENGINEERING SERVICES Sub-Consultant GM2, Inc. SUBSURFACE UTILITY EXPLORATION (SUE) Sub-Consultant US Utility Potholing & Air Excavation GEOTECHNICAL ENGINEERING Sub-Consultant Nutting Engineers of Florida, Inc. TRAFFIC DATA COLLECTION Sub-Consultant National Data & Surveying Services, Inc. (NDS) City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 59 FINANCIAL, ECONOMIC, AND RATE STUDIES Sub-Consultant Lambert Advisory MECHANICAL, HVAC & PLUMBING ENGINEERS Sub-Consultant Delta G Consulting Engineers, Inc. Sub-Consultant Diaz-Murphy & Associates CES, LLC (DMA) MATERIALS SAMPLING AND TESTING Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 59 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 60 Resumes Y E Y F J M, PE Project Manager E BS, Civil Engineering Florida State University L C Florida Board of Professional Engineers Professional Civil Engineer #69036 Federal Highway Administration Advanced Temporary Traffi c Control Certifi cate Florida Department of Transportation Local Agency Program & Florida Highway Administration Certifi cation and Recertifi cation Florida Department of Transportation Specifi cations Package Preparation Certifi cation Florida Department of Environmental Protection Stormwater, Erosion Control and Sedimentation Qualifi ed Stormwater Management Inspector Occupational Safety and Health Administration (OSHA) 10-Hr OSHA Training in Construction Safety and Health W H Director of Engineering & Civil Engineer Calvin, Giordano, and Associates, Inc. (CGA), a SAFEbuilt Company 2004 – Present P E Project Manager Dania Cove Park Improvements Dania Beach, FL Design & installation of park improvements, including seawalls, pavilions, and walking paths. Project Manager & Engineer of Record Water Main and Force Main Subaqueous Crossing of the Dania Cut-off Canal Dania Beach, FL Replacement of the existing water and sewage force mains under the Dania Cut-off Canal via horizontal directional drill to accommodate the proposed canal dredging. Project Manager Water Main Replacement on NE 2nd St Dania Beach, FL Replacement of 1300 LF of existing water main in a residential neighborhood. Senior Project Manager Rolling Oaks Park Miami Gardens, FL Design and construction of an ADA-compliant pedestrian trail and associated retention areas in the park. Project Manager Rickenbacker Causeway Project Miami Dade County, FL In-house Project Manager responsible for drainage and S&PM on the design build team with Kiewit Construction for the rehabilitation of the Rickenbacker Causeway’s West Bridge and the Rehabilitation and expansion of the Bear Cut Bridge. Senior Project Manager Windmill Park Coconut Creek, FL Design of a 14-acre site redevelopment for site improvements to an existing park. Senior Project Manager Davie Road Complete Streets Phases I & II Davie, FL Two phases of complete streets design for Davie Road. Senior Project Manager and Engineer of Record Davie Road Complete Streets Phase III Davie, FL Davie Road from Orange Drive to SW 39th Street improvements that added two mid-block crossings, landscaped medians, expanded sidewalks and new school signal. Sr. Project Manager & Engineer of Record Nova Drive Complete Streets & Roadway Improvement Project Davie, FL Project to widen a portion of the corridor from 2 to 4 lanes, add bike lanes, safer sidewalks, a new roundabout, lighting, landscaping, and upgraded signalized intersections. Engineer of Record Water Main Replacement on NE 2nd Ave Dania Beach, FL 2020 – 2022 Replacement of 8000 LF of existing water main in a residential neighborhood. Senior Project Manager Broad Causeway LAP Project Bay Harbor Islands, FL Design and construction document preparation for adding a paved shoulder to the Causeway and replacing the pedestrian handrail along the waterways bridge. Senior Project Manager Oak Grove Park North Miami, FL Design, permitting, and engineering during construction for improvements to the existing park, including tennis courts and walking paths. Senior Project Manager Pine Island Park Plantation, FL Complete reconstruction and re-design of the City’s signature 24 acre park, with 8 new soccer fi elds, including one artifi cial turf fi eld, new storage and restroom building, and a new expanded parking lot. Project was funded by the City’s GO Bond. Senior Project Manager SW Quadrant Drainage Improvements Hallandale Beach, FL Major enhancements to reduce fl ooding by utilizing pressurized injection walls, a new pumpststation, and automated control structure in a tidally infl uenced area. Project Manager NE Quadrant Drainage Improvements Hallandale Beach, FL Rehabilitation of the drainage system within the City’s NE Quadrant with 15 pressurized injection wells and two dual pump stations. Engineer of Record Miami Beach Pedestrian Priority Project Miami Beach, FL Civil EOR for the pedestrian enhancements to multiple intersections in the Lincoln Road mall corridor. Currently in fi nal design. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 61 E BS, Landscape Architecture Ball State University BS, Environmental Design Ball State University L C State of Floria Board of Landscape Architecture Registration #LA0001181 International Society of Arborists, Florida Chapter Certifi ed Arborist License #FL0777 W H Senior Landscape Architect Calvin, Giordano & Associates, a SAFEbuilt Company 2003 – Present Owner/Principal Michael D. Conner Landscape Architect 2000 – 2003 Landscape Architect/Arborist City of Cooper City, FL 1990 – 2000 P E Project Manager - Landscape Review and Arborist Services Underline Phase 3 Miami-Dade County, FL CGA was awarded this contract by DTPW, in conjunction with Friends of the Underline, for the Underline, which is a 10-mile- long linear park under development. Mr. Conner’s primary role is to examine and make recommendations about everything related to the existing trees throughout this linear park. Landscape Architect and Project Arborist Urban Forestry Master Plan Miami Beach, FL Partnered with the Davey Resource Group on preparing an Urban Forestry Master Plan for the City of Miami Beach, Florida. The Master Plan provided clear goals for enhancing the City’s Urban Forest, addressing sea level rise, recommendations for achieving those objectives, some Case Study Plans, and a “Tool Box” section with examples and details illustrating how to plant trees in highly urbanized sites. Lead Arborist North Beach Oceanside Park Miami Beach, FL Responsible for conducting health and conditions evaluations of all impacted trees and developing Arborist Reports for each. Built upon existing knowledge of the City of Miami Beach’s unique soil conditions and based evaluations on City’s goals to preserve and increase tree canopy over palm canopy. Landscape Architect Mills Pond Park Fort Lauderdale, FL Three new synthetic turf soccer and lacrosse fi elds including coordinating surveying, civil engineering, electrical engineering, site planning, and landscape architecture. Landscape Architect Memorial Regional Hospital - 35th Avenue Streetscape Hollywood, FL Designed hardscape, landscape, and lighting for a streetscape and wayfi nding project on N. 35th Ave through the hospital campus. Landscape Architect Nova Drive - Complete Streets Improvements Davie, FL Designed new planting and irrigation systems to support complete streets upgrades for the Town’s existing two-lane roadway. Landscape Architect Davie Road Improvements - Phase I & II, Davie, FL Designed landscape and irrigation for new medians in the Davie Road widening and complete streets project from SW 39th Street to I-595. Project Manager Landscape and Streetscape Design Standards Oakland Park, FL Developed new design guidelines and landscaping standards to replace outdated City codes, covering new developments, City projects, and homeowner recommendations. Landscape Architect Andrews Avenue Improvements - Transportation Enhancement Grant Oakland Park, FL Designed new planting and irrigation for major improvements to a Broward County roadway in Oakland Park under a Broward MPO Grant. Landscape Architect Vista Park Phase II Weston, FL Landscape park design for upgraded park facilities, new trails, expanded parking, and modifi cation of park programming, including new entry signage and replacement of football fi elds with upgraded drainage systems. Landscape Architect Public Works Facility Weston, FL Developed site, landscape, and irrigation designs for a new public works facility, featuring a fueling station, City-branded elements, buffer planting for adjacent neighborhoods, and security planning. Landscape Architect Mary Saunders Park West Park, FL Detailed site design and landscape and irrigations plan for the improvements at the existing park, which included a new parking area, an enhanced entranceway and new lighting. Landscape Architect John U. Lloyd State Park-Boardwalk Replacements Dania Beach, FL Created detailed design plans and construction drawings for replacing four wood boardwalks providing beach access at the park. Landscape Architect Pines Boulevard Medians - Beautifi cation Grants - Phase I & II Pembroke Pines, FL M C, PLA, ASLA, ISA Landscape Architects Team Lead Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 62 E BS, Landscape Architecture Texas A&M University College Station, TX L C State of Floria Board of Landscape Architecture Registered Professional Landscape Architect #0001328 W H Landscape Architect Calvin, Giordano & Associates, a SAFEbuilt Company 1997 – 2023 President Landscape Planning Associates, Inc. 1991 – 1997 P E Landscape Designer/Architect Community Enhancements Bay Harbor Islands, FL Led a team of civil, utility, traffi c and electrical engineers and construction administration for the creation and implementation of enhancements. Landscape Designer/Architect Kane Concourse Beautifi cation Bay Harbor Islands, FL Oversight of hardscape and planting of streetscape improvements for the Town’s business district, including street furnishings, wayfi nding, and irrigation. Landscape Designer/Architect Middle Beach Recreational Corridor Miami Beach, FL Led a team of designers and engineers in the design, engineering, planting, and permitting of a 2-mile stretch of a 15-foot- wide ocean-front hardscape pathway connecting Indian Beach to Allison Park. Landscape Designer/Architect Oak Grove Park North Miami, FL Designed a new site plan for two tennis courts which required the relocation of six large oak and gumbo limbo trees. Landscape Designer/Architect Dania Cove Park Dania Beach, FL Designed a stabilization system for a badly eroded and unstable shoreline embankment and developed a shoreline vegetation plan. Landscape Designer/Architect A1A North Galt Streetscape Fort Lauderdale, FL Responsible for the site and landscape design for a parking and streetscape project. Landscape Designer/Architect Andrews Avenue Transportation Enhancement Grant Oakland Park, FL Led a team of designers in the design, project included public outreach, tree disposition plans, a new median with mid-block crossings to address safety issues, planting design to enhance the streetscape and hardscape design, irrigation design. Landscape Designer/Architect Gator Run Park Weston, FL Responsible for site design and planting specifi cations for a 5-acre community park, including lighting improvements, continuous walking paths, children’s play equipment, planting, and irrigation design. Landscape Designer/Architect Corridors Beautifi cation Master Plan Weston, FL Coordinated drainage upgrades and roadway designs as part of a master plan, incorporating landscape planting and branding along major thoroughfares. Landscape Designer/Architect Sombrero Beach Park Marathon, FL Responsible for the park master plan and design for the creation of a beach-front park with dune access, volleyball courts, playgrounds, beach amenities, dune and turtle resting habitat restoration. Landscape Designer/Architect Lloyds Estate Drainage Park Oakland Park, FL Conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements, and wetland (bioswale) and upland planting. Landscape Designer/Architect Miramar Parkway Landscape Improvements Miramar, FL Prepared conceptual designs for gateway features at the entrance into the City. Landscape Designer/Architect Fire Station Plaza Delray Beach, FL Led a team of site designers and engineers in the development of a public plaza on a primary threshold into the downtown CRA area. Landscape Designer/Architect SE 2nd Street and 2nd Avenue Streetscape & Permeable Paving Parking Lot Delray Beach, FL Designed concepts for the permeable paving parking lot concepts and community outreach presentations. Landscape Designer/Architect Tamarind Avenue Streetscape West Palm Beach, FL Responsible for the landscape architectural portion of this critical neighborhood improvement project. T C-W , ASLA, PLA, LEED AP BD+C Landscape Architect & LEED Professional Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 63 E MS, Landscape Architecture & Environmental Urban Design Florida International University Miami, FL MS, Architecture Florida International University Miami, FL L C State of Florida Registered Professional Landscape Architect #LA0002019 W H Landscape Designer Calvin, Giordano & Associates, Inc., a SAFEbuilt Company 2023 – Ongoing Landscape Architecture Intern Calvin, Giordano & Associates, Inc., a SAFEbuilt Company 2022 – 2023 Junior Architect Laura M. Perez & Associates Miami, FL 2021 – 2022 TOM Fellow TOM Tikkun Olam Makers, Florida International University Miami, FL 2020 – 2022 Course Assistant for Structures Florida International University 2020 Architectural Intern Plusurbia Design 2020 Drafter & Renderer Debris Maze Challenge by Gabriela Barrocas 2018 – 2019 Lab Technician/Student Assistant Florida International University 2018 – 2019 P E Landscape Designer Coral Estates Park; Miami, FL Contributed to the preparation of planting design for construction documents. Landscape Designer Downtown Dog Park; Miami, FL Contributed to technical tasks, including 3D modeling and rendering, site plan drawings, and construction document detailing. Landscape Designer Guy Davis Park; Stuart, FL Prepared site plan drawings and construction document detailing. Landscape Designer Lake Hamilton Trails & Master Plan Visioning; Lake Hamilton, FL Developed preliminary conceptual site plan design for a civic park focused on a multi-generational park experience. Landscape Designer Destin Town Center Master Plan Destin, FL Co-created graphics for a city-wide vision of improving city-owned properties, including coordination with architects to generate 3D model renderings to explore three potential site improvements. Landscape Designer Hanford Civic Park; Hanford, CA Developed a preliminary site plan for a civic park, enhancing pedestrian experiences with a multi-functional promenade, furnishings, and a water feature. Landscape Designer North Palm Desert Park; Palm Desert, CA Contributed to community engagement events by preparing visual graphics and assisting in the in-person open house. Landscape Designer Antelope Creek Park; Woodlake, CA Prepared site plan drawings, construction document detailing, and selected materials, palettes, lighting, and branding elements. Landscape Designer Lake Dalwigk Park Improvements; Vallejo, CA Prepared site plan drawings and construction document detailing. Community Engagement Specialist Gator Run Park Improvements; Weston, FL Assisted with boards for Public Engagement and technical drawings for construction documents. Planning Support North Miami Beach Urban Forestry Master Plan; North Miami Beach, FL Assisted in developing a full report addressing the opportunities and constraints of the existing tree canopy in North Miami Beach, complete with technical documentation and infographics. Community Engagement Specialist Windmill Ranch Park Improvements; Weston, FL Assisted with boards for Public Engagement and technical drawings for construction documents. M A Member American Society of Landscape Architects (ASLA) A R 2024 Design Award of Merit – Unbuilt Category (for Antelope Creek Park) American Society of Landscape Architects – Florida Chapter S N, PLA, ASLA Landscape Architect & Head Landscape Designer Y E Y F E-P B City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 64 E MS, Landscape Architecture & Environmental Urban Design Florida International University; Miami, FL MS, Urban Design St. Petersburg State University of Architecture and Engineering; St. Petersburg, Russia BS, Urban Design St. Petersburg State University of Architecture and Engineering; St. Petersburg, Russia W H Landscape Designer Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2023 – Present Senior Landscape Designer Threshold Landscape Workshop; Fort Lauderdale, FL 2022 – 2023 Lead Architect Moscow Urban Center; Moscow, Russia 2021 – 2022 Design Researcher Strelka Institute for Media, Architecture, and Design; Moscow, Russia 2021 Urban Designer MLA+; St. Petersburg, Russia 2020 – 2021 Landscape Architect Art Lebedev Sutdio; Moscow, Russia 2019 – 2020 Journalist/Project Manager Project Baltia; St. Petersburg, Russia 2016 – 2020 Contract Landscape Architect Checkharda; Moscow, Russia 2019 Urban Planner STEP Transportation Solution Studio; Moscow, Russia 2018 – 2019 Lead Architect AOCG; St. Petersburg, Russia 2017 – 2018 Architect Semrén & Månsson Arkitekter; Moscow, Russia 2016 – 2017 P E Landscape Designer Ocean Drive Lighting & Hardscape Improvements Miami Beach, FL Developed multiple design options for paving and lighting, created graphics and 3D models, and assisted with presentation preparation. Landscape Designer Windmill Ranch Park Weston, FL Assist with technical drawings for construction documents and developed preliminary playground design options. Landscape Designer Antelope Creek Park Woodlake, CA Contributed with the preparation of construction documents and developed informational signage highlighting the site’s historic aspects. Landscape Designer North Shore Community Park Palm Desert, CA Assisted with 3D modeling, rendering, site plan drawings, and construction document detailing. Supported public engagement by preparing presentation boards and conducting product research. Designed preliminary conceptual graphics, focusing on placemaking and branding. Landscape Designer North Shore Regional Sports Park Palm Desert, CA Developed preliminary site plan options with 3D modeling and rendering. Assisted with site plan drafting and related graphics. Landscape Designer Hanford Transportation Improvements Hanford, CA Contribute to the preparation of planting design for construction documents. M A Member American Society of Landscape Architects (ASLA) Member Young Leaders Council (YLC) for the Sun Coast Region of the National Parks Conservation Association (NPCA) A R 2024 World Landscape Architecture Award Merit Award in Student Concept (Graduate) The Costly Truth About Lawns 2024 Game Changers Award Recognized by the American Society of Landscape Architects 2024 ASLA FL Student Award of Honor Research and Communication Category The Costly Truth About Lawns 2024 ARCC King Medal for Research Research and Communication Category The Costly Truth About Lawns 2024 ASLA FL Student Honor Award Recognized by the American Society of Landscape Architects (Florida Chapter) 2024 ASLA FL Student Award of Excellence Planning and Analysis Category Waterland Urban Framework (group project) 2024 ASLA FL Student Award of Merit Planning and Analysis Category Machine in the Garden (group project) 2023 ASLA FL Student Award of Excellence Planning and Analysis Category Coral Games (group project) V T, ASLA Landscape Designer Y E Y F E-R B City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 65 M M Irrigation Designer Y E Y F E-S B E AA, General Studies Miami Dade College Architectural Studies Florida State University Tallahassee, Florida W H Landscape Design/Irrigation Calvin, Giordano, and Associates (CGA), a SAFEbuilt Company 1997 - Present Landscape Planning Associates, Inc. Coral Gables 1995 - 1997 P E Irrigation Designer Created landscape design for irrigation for the following CGA projects: Louise Marie Park City of Coral Gables, FL Assisted with the detailing, general layout of the site, and irrigation design. College Avenue Phase 2 Davie, FL This project was partially funded by an FDOT County Incentive Grant and one of the fi rst MAP Broward Surtax funded projects. It included the conversion of College Avenue from SR 84 to Nova Drive from a 3-lane section to a 4-lane divided roadway. The scope included adding a median, an additional lane in each direction, shared lanes for bicyclists, sidewalk connections and ADA upgrades, landscaping, drainage and lighting modifi cations, and utility coordination. Due to the high bus and tractor trailer volumes within this industrial corridor, an access management study was completed in order to properly place and size the lengths of the left turn lanes within the corridor. Permitting was required through the local drainage district, Broward County Highway Construction and Engineering Division, FDOT for work near SR 84, SFWMD, and the Town of Davie. Nova Drive - Complete Streets Improvements Davie, FL Developed new planting and irrigation designs for the implementation of some complete streets improvements to the existing two-lane roadway through the Town of Davie. Joe DiMaggio Children’s Hospital Hollywood, FL Designed the irrigation system for the new hospital. Memorial Regional Data Center Hollywood, FL Developed plans and details for the relocation of vegetation and new planting. Yellow Green Farmers Market Hollywood, FL Responsible for the preparation and coordination of the site plan layout/design, and irrigation design for this project. Andrews Avenue Improvements Transportation Enhancement Grant Oakland Park, FL Developed a new irrigation design for the major improvements to the Broward County roadway through the City as part of a Broward MPO Grant. City of Weston, FL –Gator Run Parking Expansion (237936) – Windmill Ranch Park (237935) Memorial West - Bed Tower Addition Pembroke Pines, FL Developed plans and coordinated details for the hardscape, as well as planting and irrigation design for the major expansion of the Memorial West Hospital facilities. Shops at Pembroke Gardens Pembroke Pines, FL Create site plan design to accommodate and meet parking, fi re safety, and circulation requirements. Fire Station Plaza Delray Beach, FL Developed plans and details for a public plaza on a primary threshold into the downtown CRA area. Tamarind Avenue Streetscape West Palm Beach, FL Responsible for the preparation of all construction drawings for the landscape and irrigation features of this critical neighborhood improvement. SRWRF Reuse Plant Palm Beach County, FL Irrigation design for this large-scale reuse irrigation project for the wastewater treatment plant that produces the reuse water for the county. City of Woodlake, CA projects: –Antelope Creek Park –East Naranjo Transportation Improvements City of Hanford, CA City of Hanford Downtown City of Vallejo, CA Lake Dalwigk Park Improvements A R 2024 Design Award of Merit – Unbuilt Category (for Antelope Creek Park) Bestowed By the American Society of Landscape Architects – Florida Chapter City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 66 E AS, Landscape Technology Broward College Davie, FL L C Landscape Inspectors of Florida Certifi ed Landscaper Inspector #125 Federal Emergency Management Agency (FEMA) Level 3 Certifi ed W H Landscape Ispector Calvin, Giordano & Associates, Inc., a SAFEbuilt Company Director of Forestry Landscape Department City of Hollywood, FL Site Planner in the Community Development Department City of Hollywood, FL P E Reviews, Tree Preservation, Inspections and Code Writing Davie, FL Provides landscape reviews for site plan, engineering, and building, supervises landscape inspections, and assists in landscape as well as tree preservation code writing. Reviews, Tree Preservation, Inspections and Code Writing Weston, FL Provides landscape reviews for site plan, engineering, and building, supervises landscape inspections, and assists in landscape as well as tree preservation code writing. Reviews and Inspections North Lauderdale, FL Provides landscape reviews for site plan, engineering, as well as building and supervises landscape inspections Reviews and Inspections Lauderdale Lakes, FL Provides landscape reviews for site plan, engineering, as well as building and supervises landscape inspections Landscape Reviews Lauderhill, FL Provides landscape reviews Reviews, Inspections and Code Writing Margate, FL Provides landscape reviews, supervises landscape inspections and assists in landscape code writing Reviews and Code Writing Lighthouse Point, FL Provides landscape reviews and assists in landscape code writing Reviews and Code Writing Hillsboro Beach, FL Provides landscape reviews and assists in landscape code writing Reviews, Tree Preservation, Inspections and Code Writing Hollywood, Miramar, West Park, Surfside, Lake Park, Dania Beach, Deerfi eld Beach, Pahokee, Wellington, Miami Beach, Palm Beach, and Estero, FL Has provided landscape reviews for site plan, engineering, and building, supervises landscape inspections and assists in landscape as well as tree preservation code writing Inspections Hollywood, FL Provides or has provided inspection supervision, landscape plan review and site inspection services Inspections Dania Beach, FL Provides or has provided inspection supervision Site Plan Reviews Surfside, FL Provides or has provided site plan reviews, landscape plan review and site inspection services Site Plan Reviews Davie, FL Provides or has provided site plan reviews, landscape plan review and coordination with municipal applicants Landscape Code Deerfi eld Beach, FL Provided a re-write of the City’s landscape code and updated several sections to incorporate Florida Friendly requirements, address sustainability efforts and include updates to the landscape section to coordinate with other sections of the City’s code requirements for consistency. Landscape Code Palm Beach, FL Provided a review of the Town’s Landscape code to include updates to ISA, Florida Friendly and Water Wise planting; this code also included portions of the Towns Tree Preservation Ordinance and Conservation areas M A Landscape Inspectors of Florida Former Board Member W “B” T Landscape Inspector/Plan Reviewer + Y E + Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 67 N “N” K, PE General Civil Engineers Team Lead Y E Y F E ME, Civil Engineering University of Florida BS, Civil Engineering Florida State University L C Florida Board of Professional Engineers Registration #78536 Georgia Board of Professional Engineers Registration #PE054653 Florida Department of Environmental Protection Stormwater, Erosion, & Sedimentation Control Inspector #40536 W H Senior Project Manager Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company, Ft. Lauderdale, FL 2014 – Current Design Engineer IBI Group, Pompano Beach, FL 2012 – 2014 Field Engineer GSE Engineering and Consulting, Gainesville, FL 2010 – 2012 P E Engineer of Record Bal Harbour Village Hall Bal Harbour, FL As EOR for Civil, Nicholas oversaw the grading, water, sewer, and stormwater design in close coordination with the other disciplines to accommodate all proposed infrastructure. The stormwater design included gravity injection wells and exfi ltration trench. Specifi c tasks included utility coordination, design layout, drainage calculations, preparing a basis of design report, historical permit research, attending design review meetings, permitting, and limited construction services. Project Manager Distribution System Water Master Plan Lauderhill, FL Project Manager for the preparation of a master plan for the City’s potable water distribution system. The City owns, operates, and maintains a water treatment plant and distribution system that serves approximately 55,000 customers. Project Manager Water Master Plan Mangonia Park, FL Project Manager for the preparation of a water master plan for the Town. The Town owns, operates, and maintains a water treatment plant and distribution system that serves approximately 2,000 customers. The purpose of the master plan was to evaluate the existing water supply and distribution system, water treatment plant infrastructure, and to prioritize projects based on current and future needs. Project Manager Lauderhill NW 82nd Ave Water Main Replacement Lauderhill, FL Within a residential neighborhood, approximately 3,000 linear feet of existing 12-inch asbestos cement water main was in disrepair and needed to be replaced. Project Manager Lift Station No. 48 Rehabilitation and Force Main Replacement Cooper City, FL Project Manager for a municipal sewer pump station rehabilitation project that included over 1,400 LF of 4” force main installed primarily by horizontal directional drilling. Project Manager North Galt Shops Streetscapes and Parking Improvements Fort Lauderdale, FL Parking improvement project that included new landscape, irrigation, decorative light poles, curbing pavement, striping, signage, sidewalk, drainage infrastructure, and geometric traffi c improvements. Project Manager Riverwalk Seawall Assessment Fort Lauderdale, FL Project Manager for a seawall and dock assessment to investigate settled pavers and wing walls, utilities that had become submerged from detached support, and provide recommendations for repair and/ or replacement. Scope included above and below water surface inspections, documenting site pictures, and preparing a summary/recommendation report inclusive of exhibits. Project Manager Andrews Avenue Forensic Seawall Assessment Fort Lauderdale, FL Project Manager for a forensic seawall assessment to investigate shallow sinkholes that had developed upland of the seawalls. Scope included bathymetric survey, above and below water surface inspections, documenting site pictures, and preparing a summary/recommendation report inclusive of exhibits with canal cross sections, section details of the seawall structural system, and 3D renderings. Project Manager SE 2nd Ave and 7th St Water Improvements Dania Beach, FL Project Manager for a water main replacement project within a residential community that included over 6,000 LF of new 12” water main, valves, hydrants, services, asphalt milling and resurfacing, and new pavement markings and signage. Project Manager SE 36th Ave Streetscape Boynton Beach, FL Project Manager for a streetscape improvements project in a residential neighborhood that included roadway reconstruction, landscaping, irrigation, drainage infrastructure, lighting, pavement markings, and signage. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 68 E MS, Environmental Engineering Florida International University BS, Civil Engineering Florida State University L C Florida Board of Professional Engineers Registration #72304 Florida Department of Environmental Protection Qualifi ed Stormwater Management Inspector #8491 W H Civil Engineer Calvin, Giordano and Associates, Inc. (CGA) a SAFEbuilt Company 2017 – Current Project Manager CPH, Inc., Miami, FL 2013 – 2017 Fellow/Research Assistant Florida International University Applied Research Center 2010 – 2013 Project Engineer Bohler Engineering, Fort Lauderdale, FL 2008-2008 Project Engineer Sun-Tech Engineering, Inc., Fort Lauderdale, FL 2007 – 2008 Project Engineer Creech Engineers, Stuart, FL 2003 – 2007 P E Engineering Plan Reviewer CGA contract with the City of Sunny Isles Beach, FL Lead Public Works review for the City’s Building Department for commercial and residential projects. City Engineer CGA contract with the City of Sunny Isles Beach, FL Temporarily served as City Engineer while the City recruited and hired a permanent City employee for this position. Engineering Plan Reviewer CGA contract with the Village of Bal Harbour, FL Lead Public Works and Utilities review for the City’s Building Department for commercial and residential projects. H B H, PE Engineering Plan Reviewer Y E Y F Consulting Engineer CGA Contract with the City of Bal Harbour Village, FL Manages the Sunshine 811 services and oversees the requests for as-builts for any proposed projects in the Village. Civil Engineer CGA Contract with the Bal Harbour Village, FL Responsible for issuing the bid for the Sewer Pump Station No. 1 Drainage Improvements Bid on behalf of the Village, which included preparation of technical specifi cations and bid documents, submission of the bid to multiple vendors preparation of the probable construction cost estimate for a comparison to the bid amounts received, responding to technical questions from prospective bidders, preparation and issuance of associated addendum, and providing a recommendation of the lowest responsive and responsible bidder to the Village. Civil Engineer CGA Contract with Key Biscayne, FL Designed and permitted for the relocation of the existing drainage Outfall O-13 in the Village of Key Biscayne, a pre-versus post-drainage analysis is required to demonstrate that proposed improvements alleviate the current fl ooding in the 14 Harbour Point Right-of-Way. Engineering Plan Reviewer CGA Contract with the City of Dania Beach, FL Provided plan review services for the City for the right-of-way permits. Civil Engineer CGA Contract with the City of Dania Beach, FL Assisted the City Engineer in the City’s day-to-day activities such as addressing customer concerns, responding to customer requests, providing utility atlases, and managing City projects as needed. Civil Engineer CGA Contract with the City of Hollywood, FL The Drainage and Utility Engineer for the Yellow Green Farmer’s Market Expansion include a drainage analysis of the existing conditions and the proposed improvements; the design consists of an exfi ltration trench to provide storage for the improvements. Civil Engineer CGA Contract with the City of Lauderhill, FL Liaison between the Landscape Team and the City to meet the City’s criteria and time frame for the beautifi cation improvements of Ilene Lieberman Botanical Park and 17th Street Park. M A American Society of Civil Engineers Florida Engineering Society A R 2017 Young Engineer of the Year American Society of Civil Engineers Florida Section City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 69 E BS, Civil Engineering University of Dayton L C Florida Board of Professional Engineers Professional Civil Engineer #70870 Florida Department of Environmental Protection Stormwater, Erosion Control, and Sedimentation Qualifi ed Stormwater Management Inspector #13907 Occupational Safety and Health Administration (OSHA) 10-Hr OSHA Training in Construction Safety and Health W H Senior Project Manager Calvin, Giordano, and Associates (CGA), a SAFEbuilt Company, Ft. Lauderdale, FL 2014 – Present Project Engineer Keith and Associates, Pompano Beach, FL 2012 – 2014 Professional Engineer TDM Consulting, Inc., Ft. Myers, FL 2006 – 2012 Project Manager Neese and Associates 2005 – 2006 P E Civil Engineer CGA contract with Florida Department of Environmental Protection (FDEP) Continuing services contract with FDEP, PM and EOR for this septic tank conversion project on the state-owned lands located at Oleta River State Park in North Miami. Engineer-of-Record/Project Manager Zachary Taylor State Park Overfl ow Parking Lot - Key West, FL Lead designer for the overfl ow parking lot to serve the park. Parking lot modifi cations included driveway connectivity to provide additional parking during peak season park attendance. Civil Engineer CGA contract with the City of North Miami Beach, FL Continuing services contract with FDEP, PM and EOR for this septic tank conversion project on the state-owned lands located at the Oleta River State Park within the City. Civil Engineer CGA contract with the City of Boca Raton, FL Led the design efforts for this proposed water main improvements Boca Bath and Tennis Water Main Improvements project. Civil Engineer CGA contract with the City of Boca Raton, FL Engineer of Record for the Boca Sewer Manhole project. Design included replacement of several existing manholes at two project sites due to the presence of unsuitable soils. Civil Engineer CGA contract with the City of Boca Raton, FL Engineer of Record for the Sunfl ower Townhouse Water Main Improvements project. Services included oversight of design for the small diameter water main replacement project played an important role. Engineer of Record CGA contract with the City of Hallandale Beach, FL Engineer of Record for the SW Quadrant Drainage Improvement project which includes major enhancements to the existing drainage system within the City’s SW Quadrant to reduce the fl ooding during large storm events by isolating the system from tidal infl uence and pumping the stormwater into proposed injection wells. Civil Engineer CGA contract with the City of Oakland Park, FL Project Engineer and lead designer for the Lloyd Estates lift station out parcel for an improved stormwater management system to aid in the reduction of fl ood duration and elevation during storm events. Civil Engineer CGA contract with the City of Dania Beach, FL Project Manager for initial design and permitting for the improvements contained in the recommendation of the Storm Water Master Plan of Basin 5, Phase II. Civil Engineer CGA contract with the City of Hollywood, FL Project Engineer for the construction of a solarium addition to the existing Memorial Hospital South facility in Hollywood, Florida. Engineer-of-Record/Project Manager Memorial Regional Hospital Force Main and Lift Station Upgrades - Hollywood, FL Project engineer for the project scope consisting of removing the existing master & new parking garage pump stations, grouting existing force main, installing new tri-plex submersible pump station and piping, new top slab with an access hatch and safety grate, new gravity sewer, upgrading the internal control panel appurtenances, and replacing the force main with 12-inch HDPE pipe. Engineer-of-Record/Project Manager Memorial Hospital South Solarium - Hollywood, FL Project Engineer for the construction of a solarium addition to the existing Memorial Regional Hospital South (MRHS) facility located in Hollywood. Design of the solarium included an ADA accessible entrance, drainage modifi cations, parking lot reconfi guration, along with pavement marking and signage improvements for the existing facility. J “J” M, PE Water/Sewer Engineer Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 70 E BS, Civil Engineering Florida International University L C State of Florida Engineering Intern # 1100030191 W H Design Engineer Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2023 – Present P E Design Engineer Ocean Drive and Lummus Park Improvements Miami Beach, FL Responsible for roadway inventory description to assess roadway conditions and QAQC multiple intersection design options. Design Engineer College of Florida Keys - Signage and Pavement Marking Key West, FL Maximize parking spaces for the College and replace their signs with MUTCD compliance signs. Sketch out existing conditions and propose additional parking spaces, speed bumps, and signage in compliance with MUTCD. Assisted with the determination of how many vehicles entered, stayed on, and left campus with data from peak weekday and weekend hours, as well as peak AM and PM hours. Design Engineer Nova Drive Phase II Davie, FL Buffered bike lanes, medians, ADA and S&PM upgrades. Responsible for utility coordination to identify confl ict points, and signing and pavement marking plans.. Design Engineer Hallandale Beach Overfl ow Parking Hallandale Beach, FL Design extra parking spaces for City Hall, implementing exfi ltration trenches to replace the added impervious surfaces, curb ramp with detectable warning in accordance with FDOT, utility coordination to identify confl icts, and midblock crossing from the parking lot to City Hall. Design Engineer Town Center Blvd Milling, Paving, and Resurfacing Weston, FL Coordinated with construction project managers to determine project schedule and inspection and ensure work was performed as intended. Assisted with payment to contractors by ensuring work was delivered according to plan. Design Engineer Lift Station Driveways Weston, FL Designed concrete driveways for fi ve lift stations to allow maintenance vehicles to park. Process involved determining utility confl icts, determining easement through BCPA plats, and designing driveways in accordance with FDOT. Design Engineer Intern Bonaventure Milling, Paving, and Resurfacing Weston, FL Responsible for designing plans for milling, paving, and resurfacing and restriping in accordance with Broward County standards. Design Engineer Intern Pavilion Replacement with Electricals Weston, FL Designed project plans for the replacement of two pavilions at Vista Park with components involved such as installing water fountains, additional receptacles, replacing sidewalk, and regrading sod around it for positive drainage. Coordinated with Park Supervisor to determine utilities and power source to supply power to added equipment. T “T” Z, EI Design Engineer Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 71 E BS, Civil Engineering University of New Hampshire L C Florida Board of Professional Engineers Passed PE Exam in June 2026, PE License Expected in Fall 2026 Engineer in Training Certifi cation W H Design Engineer Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2024 – Present P E Design Engineer Palmetto Bay Sub-Basin 42 Improvements Palmetto Bay, FL Serving as an Engineer for the design of drainage improvements including inlets, pipes, and approximately 2,100 LF of exfi ltration trench for the Village of Palmetto Bay. Tasks completed included creating a surface in AutoCAD Civil 3D, developing a stage storage model in StormWise, and preparing construction documents. Design Engineer Hallandale Ave NE 14th Avenue Water Main Improvements Hallandale Beach, FL Serving as an Engineer assisting with the design of approximately 4,000 LF of new potable water main for the City of Hallandale Beach. Tasks completed and in progress include utility coordination, evaluating design alternatives based on both open trenching and HDD construction methods, and preparing construction documents. Design Engineer Nova Drive Phase 2 Davie, FL Serving as an Engineer for the design of Nova Drive Phase 2 for the Town of Davie. The scope of the project consists of upgrading an existing roadway with improvements including road widening, reconstruction, and milling and resurfacing as well as utility relocations, landscaping, irrigation, sidewalk, curb and gutter, new and relocated guardrail protection, bicycle lanes, new street lighting, and upgraded pavement markings and signage. Tasks in progress include preparing drainage calculations, construction documents, and a stage storage model in StormWise. Design Engineer Stevens Field Improvement Project Oakland Park, FL Serving as an Engineer assisting with the design, coordination, and permitting efforts for the Stevens Field Improvement Project in the City of Oakland Park. His specifi c tasks involve stormwater design, surface water management permitting, and construction document development — with a signifi cant focus on proposed grading and drainage due to site reconfi guration and new sidewalk construction. The project enhances recreational amenities and drainage infrastructure to improve community resilience and environmental sustainability. Design Engineer Central Broward Drainage Analysis Lauderhill, FL Assisted the Parks Planning & Design Section (PPD) of the Broward County Parks and Recreation Division by providing pre-design services to evaluate proposed site improvements at Central Broward Park in Lauderhill. The pre-design services included collecting existing conditions information, creating a surface in AutoCAD Civil 3D, developing a stage storage model in StormWise, and preparing a report summarizing fi ndings and recommendations for future site and stormwater improvements. Design Engineer Marina Annex Riviera Beach, FL Serving as an Engineer for the design of a mixed-use development in the City of Riviera Beach. The project scope includes roadway reconstruction, parking and driveways, sidewalk, water and sewer services, and drainage improvements including inlets, pipes, dry retention areas, exfi ltration trench, and underground stormwater chamber. Tasks in progress include preparing drainage calculations and construction documents, permitting, and attending progress meetings. Design Engineer Island Way Roadway Redesign Jupiter, FL Serving as an Engineer for the design of a new roadway, drainage improvements, and approximately 3,200 LF of new potable water main for the Town of Jupiter. Tasks completed and in progress include utility coordination, permitting, preparing construction documents, conducting site visits, developing drainage calculations, attending progress meetings, and coordination with the Town and other stakeholders. Design Engineer Guy Davis Community Park Stuart, FL Serving as an Engineer for the design of a community park in the City of Stuart. The project scope includes parking and driveway, sidewalk, water and sewer services, and drainage improvements including inlets, pipes, dry retention areas, and exfi ltration trench. Tasks completed and in progress include preparing drainage calculations and construction documents, creating a surface in AutoCAD Civil 3D, and assisting with permitting and developing a stage storage model in StormWise. S Q, EI Stormwater Engineer Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 72 E BS, Civil Engineering Florida Atlantic University L C State of Florida Engineering Intern # 1100029413 W H Design Engineer Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2025 – Present Public Works Engineering Intern City of Weston, FL, and CGA 2024 – 2025 Engineering Tutor Florida Atlantic University 2024 – 2025 P E Design Engineer Ocean Drive from 5th to 15th St, Miami Beach, FL Miami Beach, FL Transformation of a section of Ocean Drive from a oneway street to a pedestrian walkway in some areas. Mr. Diaz drew existing utilities and pavement markings and coordinated sign placement. Design Engineer Bal Harbour Camden & Bal Cross Drive Sanitary Sewer Bal Harbour Village, FL Replacement of sanitary sewer line along two roads in Bal Harbour Village. Mr. Diaz performed invert and pipe sizing calculations, QA/QC, cost estimating and put together permit packages. Design Engineer Memorial Regional Hospital (MRH) Offside Roadway Improvements Hollywood, FL Road widening on Johnson St, N 46th Avenue and N 35th Avenue, to accommodate increased capacity at MRH. Mr. Diaz worked on together a pavement marking plan to accommodate new turning lane storage needs and proposed new grading. Design Engineer Lauderhill-Plantation Water Main Interconnect Lauderhill, FL Installation of water main interconnect between Plantation and Lauderhill and 3000 ft of water main. Mr. Diaz determined the best location for the interconnect, dimensions of the parts, and locations and tie-ins for the new water main. Design Engineer Lauderhill-BC Water Main Interconnect Lauderhill, FL Installation of water main interconnect between Lauderdale Lakes (Broward County) and Lauderhill. Rocco determined location and size of vault as well as confi guration and tie-ins with existing utilities, and performed QA/QC according to plan. Design Engineer Martin Luther King, Jr. Blvd & NW 18th Dr Intersection Improvements Pompano Beach, FL Installation of mast arms, milling & resurfacing and sidewalk improvements. Mr. Diaz performed cost estimating and QA/QC, proposed roadway grades, addressed internal and Broward County Traffi c Engineering Division (BCTED) comments on plan, and performed fi eld measurements Design Engineer Town of Davie Code Rewrite and City Standards Update Davie, FL Update of the city standards of Davie. Mr. Diaz examined adjustments to the standards of other jurisdictions such as FDOT and assessed which new details needed to be added since the last update, and adjusted detail drawings accordingly. P M/A Member American Society of Civil Engineers, Florida Section, Broward County Branch R D, EI Design Engineer Y E Y FRD City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 73 E BS, Civil Engineering University of North Dakota AA, Engineering Broward College, Davie, FL W H CADD Technician Calvin, Giordano & Associates (CGA), a SAFEbuilt Company 2023 – Present CADD Technician Dynamic Engineering Consultants 2022 – 2023 CADD Technician Pike Engineering 2021 – 2022 Independent Engineering Contractor Self-Employed 2020 – 2021 Project Technician Engineering Express 2014 – 2020 P E CADD Technician Palmetto Bay Drainage Sub-Basin 42 Improvements Palmetto Bay, FL Supported engineering during bidding tasks and fi nal engineering design. CADD Technician Memorial Regional Hospital Hollywood, FL Developed a preliminary design of conceptual site plan for a hospital improvements. CADD Technician Various Engineering Projects Hallandale Beach, FL Design engineering tasks for projects including Additional Parking City Hall, Lift Station 12 Rehabilitation and Generator Revisions, NE 14th Avenue Water Main Improvements. CADD Technician Nova Drive Phase 2 Davie, FL Assisted with 60% Plans Preparation for Nova Drive improvements. CADD Technician Various Engineering Projects Davie, FL Design engineering tasks for projects including Bamford Park Artifi cial Turf Conversion North Fields and Parking Lot Expansion, Lift Station 13 Rehabilitation, Orange Drive Water Main, SW 82 Avenue Sidewalk Improvements, and Waterford Park Reconstruction. CADD Technician Miscellaneous Engineering Services Dania Beach, FL Various engineering, design, and permitting tasks, including for Holiday Lights Phase 3 Medians. CADD Technician Weston Gator Run Park Weston, FL Responsible for overseeing junior staff’s infrastructure design and permitting associated for a multifamily residential building. CADD Technician NW 3rd Avenue Area Water Main Replacement - Phase 1 Wilton Manors, FL Assisted with 30% design and data collection, 60% design, and fi nal construction documents for water main replacement. CADD Technician NW 3rd Avenue Area Drainage Improvements Wilton Manors, FL Assisted with utility and drainage easement coordination, preliminary investigation, fi nal construction documents, permitting, and bidding. CADD Technician Veteran’s Park Trail and Kayak Launch Improvements Oakland Park, FL Supported pre-design and data collection phases, 30% plans development, 90% permit plans development, and fi nal plans and bid documents. CADD Technician Everglades Holiday Park Watermain Extension Broward County, FL Engineering pre-design. CADD Technician Lake Wyman Park Playground Design Boca Raton, FL Assisted with coordination of geotechnical engineering for landscape and construction drawings and specifi cations. CADD Technician Guy Davis Park Stuart, FL Developed a conceptual site plan for a community park that enhances the pedestrian experience with generous sidewalks, furnishings, plazas, and water features, and elevates the Little League experience with three artifi cial turf fi elds, upgraded playgrounds, educational trails, and an outdoor amphitheater. Also created fabrication strategies using parametric 3D modeling, architectural visualizations, wayfi nding elements, and 3D fl ythrough animations. J C, BSCE CADD Technician Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 74 E BSLS Purdue University L C State of Florida Professional Surveyor & Mapper (PSM) #4588 W H Director of Survey Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2012 – Present P E Surveyor/Mapper General Surveying & Mapping Services Town of Surfside, FL Site Plan and Development Review Committee regarding survey matters; Engineering Design Surveys for parks and underground utility projects, Town parking lot parcels and municipal properties, sketch and legal descriptions for beach hardpack easements and FEMA Elevation Certifi cates. Surveyor/Mapper North Beach Oceanside Park City of Miami Beach, Florida Project Manager for the Boundary and Topographic Survey tasks associated with the re-design of the North Beach Oceanside Park. Survey tasks included defi ning the location of the Coastal Construction Control Line (CCCL), the Erosion Control Line (ECL), the Seasonal High- Water Line and the limits of the dune boundaries. Surveyor/Mapper General Surveying & Mapping Services Memorial Healthcare System FEMA Flood Elevation Certifi cates for Buildings. Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for Memorial Healthcare System. Surveyor/Mapper General Surveying & Mapping Services Town of Davie, FL Boundary & Topographic Surveys, Sketch & Legal Descriptions, Utility Easement preparation, Right-of-Way Maintenance Maps, Route Surveys, Construction Stakeout, As-Built Surveys. Surveyor/Mapper General Surveying & Mapping Services City of Hallandale Beach, FL Provided boundary surveys for City-owned CRA development parcels. Surveyor/Mapper General Surveying & Mapping Services City of Pembroke Pines, FL Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for the City of Pembroke Pines. Additional responsibilities include project surveyor for the topographic survey of a portion of the Pines Health Park, the Johnson Street Water Treatment Plant and the FPL Easement Parking Lot at City Centre. Surveyor/Mapper General Surveying & Mapping Services City of Weston, FL FEMA Flood Elevation Certifi cates for Community Buildings, Site Plan and Development Review Committee regarding survey matters; Engineering Design Surveys for Village Homes of Country Isles Water Main & Service replacement Project; Sketch and Legal Descriptions for parcel acquisition and City Limits Exhibits between Weston and Town of Davie. Surveyor/Mapper General Surveying & Mapping Services City of North Lauderdale, FL Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for the City of North Lauderdale. Additional responsibilities include project surveyor for the topographic survey of the municipal complex, GIS, water control district and utility mapping, Hampton Pines Park and Silver Lakes Middle School ball fi eld renovation. Surveyor/Mapper General Surveying & Mapping Services City of Margate, FL Sketch & Legal Descriptions – Utility Easement, Deed Research & Interpretation, Boundary & Topographic Survey. Surveyor/Mapper Chaminade-Madonna College Preparatory High School City of Hollywood, FL Boundary & Topographic Surveys of School Campus; Construction stakeout of modular classrooms; As-Built Surveys of completed construction. Surveyor/Mapper SRWRF Hurricane Hardening Palm Beach County, Florida Utilizing a Leica 3D Scanner, prepared as-built survey of the exterior envelope of fi ve buildings at the Southern Region Water Reclamation Facility as part of the Hurricane Hardening Evaluation project. S M. W, PSM Surveyors & Mapping Team Lead Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 75 E A.A.S., Civil Engineering Technology Nassau Community College, Long Island, NY W H Surveyor Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2017 – Present P E Survey Technician Dune Survey & Beach Front Property Map Surfside, FL Survey Technician for the base mapping of the twenty-seven (27) individual properties between Collins Avenue and the Atlantic Ocean depicting the Coastal Construction Control Line (CCCL), Bulkhead Line and Erosion Control Line (ECL) in relation to the property lines, with the town limits of Surfside. Overlaid hydrographic elevation information as provided by U.S. Army Corps of Engineers. Survey Technician North Beach Oceanside Park Miami Beach, FL Survey Technician for the Boundary and Topographic Survey tasks associated with the re-design of the North Beach Oceanside Park. Survey tasks included defi ning the location of the Coastal Construction Control Line (CCCL), the Erosion Control Line (ECL), the Seasonal High- Water Line and the limits of the dune boundaries. Project Surveyor Central Broward Park Lauderhill, FL Project Surveyor for the topographic survey of Central Broward Park for storm water analysis. Project Surveyor Northgate Park Lauderdale Lakes, FL Project Surveyor for boundary and topographic survey of Northgate Park for the City of Lauderdale Lakes. Survey Project Manager Route Survey Northwood Hills Subdivision West Palm Beach, FL Survey project manager for the 6 miles of route survey for the Northwood Hills Subdivision. Tasks included setting up GPS Control Network, supervising fi eld crew data collection, processing survey raw data fi les, drafting of improvements and quality control upon completion of preliminary survey drawings Project Surveyor Bridges South Palm Beach, FL Performed calculations for all construction stake out and construction as-built data for all infrastructure within the Bridges South development. Drafts detailed as-built surveys of all sanitary sewer, storm drainage, water main, re-claim water main and roadway. Showing when applicable horizontal location (in state plane coordinate system), rim and invert elevation, pipe sizes and material and top/ bottom of pipe elevation. Prepared sketches, legal descriptions and staking for various utility easements as needed. Project Surveyor Gardens Parkway Palm Beach Gardens, FL Project surveyor for 2.5 miles of Right of Way Mapping and topographic survey for the City of Palm Beach Gardens. Project Surveyor Apex at Avenir Palm Beach County, FL Performs calculations for all construction stake out and construction as-builts within Apex at Avenir development. Project Surveyor Water Utilities Department Palm Beach County, FL Project surveyor for the topographic surveys for a portion of PBCWUD Treatment Plants 2, 3, 8, 9 and 11. Project Surveyor Lake Wyman Park Boca Raton, FL Project Surveyor for boundary and topographic survey of Lake Wyman Park for the City of Boca Raton. Project Surveyor Eductor Pump Stations Boca Raton, FL Project Surveyor for Right of Way and topographic survey for revitalization of various lift stations. R “B” V Survey Manager Y E Y FRV City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 76 E Attending Florida Atlantic University L C Remote Pilot Certifi cate (Small Unmanned Aircraft System) AutoCAD - Civil 3D - Preparing base maps, alignments, profi les, plan and profi le sheets Confi ned Spaces W H Surveyor Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2019 – Present P E Survey Technician Various Projects Sunny Isles Beach, FL Surveying services for various projects including North & South City Entrance Signs, Seawall Parcels, William Lehman Monument Sign, and FDOT Parcel 654. Survey Technician Various Projects Bal Harbour Village, FL Surveying services for various projects including Phase 6A and 6B Bal Cross Dr Curb & Gutter, Phases 5A-5B-5C Curb & Gutter, and Harbourfront Cutwalk & Jetty Park. Survey Technician Various Projects Miami Beach, FL Surveying services for various projects including Pedestrian Priority Zone, Ocean Drive Lummus Park, and Raised Mid Block Crossing at West Avenue. Survey Technician Various Projects Broward County, FL Surveying services for various projects including Central Broward Drainage Analysis, Central Broward Stadium, and Miramar Parkway & Fairmont Avenue Intersection Improvements. Survey Technician Various Projects Fort Lauderdale, FL Surveying services for various projects including Data Collection and Preliminary Design for Hendricks Isle Water Main Replacement and SW 31st Ave Water Main. Survey Technician Various Projects Davie, FL Surveying services for various projects including Davie Bamford Park Parking Lot Expansion, Phase 1 Utility Undergrounding Project, Davie SW 61st Avenue Traffi c Circle RW Parcels, FEMA Flood Elevation Certifi cate, and Mills Pond Park Letter Modifi cation. Survey Technician Various Projects Hallandale Beach, FL Surveying services for various projects including Additional Parking at City Hall, and NE 14th Ave Water Main Improvements. Survey Technician Various Projects Pembroke Pines, FL Surveying services for various projects including Academic Village Parking Lot, Craig Rupp Dog Park & John S. Fahey Park, Flamingo Park Pavilion, Pines Recreation Center Pavilion, and Walnut Creek Park Pavilions #1 and #2. Survey Party Chief Bridges South Palm Beach, FL Surveying services for all infrastructure within the Bridges South development. Survey Party Chief Northwood Hills Subdivision West Palm Beach, FL Surveying services for various projects including 4-miles of route survey for the Northwood Hills Subdivision. Survey Party Chief Various Projects Palm Beach County, FL Surveying services for various projects including topograhic surveys for a portion of PBCWUD Treatment Plants 2, 3, 8, 9 and 11. Survey Technician Various Projects Boca Raton, FL Surveying services for various projects including Sidewalk Connectivity Upgrades, Lake Wyman Park Playground Design, and Sewer PS 078 Relocation. K P Survey Manager Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 77 P C K-M, PE, PTOE Transportation/Transit/Traffi c Engineering Team Lead Y E Y F E-S B E MS, Civil Engineering Florida Atlantic University BS, Civil Engineering Universidad de Costa Rica L C State of Florida Professional Engineer #97697 Transportation Professional Certifi cation Board (TPCB) Professional Traffi c Operations Engineer (PTOE) W H Lead Traffi c Engineer Calvin, Giordano & Associates, Inc. 2022 – Present Graduate Research Assistant Florida Atlantic University 2020 – 2022 Design Engineer RQ Ingeniería-INTRA Consultores 2017 – 2022 P E Lead Traffi c Engineer Miami Beach Pedestrian Priority Zone Miami Beach, FL 2024 - 2025 As Lead Traffi c Engineer, Mr. Chon Kan- Munoz oversaw the traffi c engineering and design services for multimodal improvements along Lincoln Road Mall and within Flamingo Park. The primary assignment consisted of the preparation of construction plans for pedestrian, bicycle, accessibility, and roadway improvements, including high-emphasis crosswalks, ADA-compliant curb ramps, bicycle parking facilities, raised crosswalks, signing and pavement markings, drainage improvements, and associated roadway modifi cations. Lead Traffi c Engineer Miami Beach Sunset Harbour Traffi c Study Miami Beach, FL 2022 - 2025 As Lead Traffi c Engineer, Mr. Chon Kan- Munoz oversaw this study, which aimed to analyze the current traffi c conditions in this neighborhood to address speeding, visibility obstructions, and pedestrian crossings at undesignated locations, in order to formulate actionable recommendations for improving overall traffi c safety and effi ciency. Lead Traffi c Engineer Emerald Estates Drive Traffi c Study Weston, FL 2023 - 2025 Oversaw this corridor study consisting of a pedestrian safety evaluation and an operational analysis of three (3) intersections along Emerald Estates Drive. This evaluation included an assessment of the need for a midblock pedestrian crossing in accordance with the criteria established in the 2024 FDOT Traffi c Engineering Manual (TEM), a review of the most recent three years of available crash data, and an evaluation of existing operating speeds. Lead Traffi c Engineer Memorial Regional Hospital Expansion Traffi c Study Hollywood, FL 2024 - 2025 Oversaw the traffi c engineering services for this Traffi c Impact Study for the Memorial Regional Hospital (MRH) Surgical & Critical Care Tower Expansion. The study evaluated the operational impacts of the proposed expansion under existing, future no-build, and future build conditions through the anticipated project completion in 2030. The analysis included eight (8) study intersections and four (4) roadway segments surrounding the hospital campus. Lead Traffi c Engineer Multimodal Mobility Study Medley, FL 2022 - 2024 Conducted this Multimodal Mobility Study and Impact Assessment to improve the transportation conditions within the Town, including bicycling, walking, and public transit options for South River Drive from NW 116th Way to NW 87th Avenue. Lead Traffi c Engineer Ocean Drive & Lummus Park Improvements Miami Beach, FL Ongoing The Traffi c Impact Study was comprised of the analysis of 64 intersections and the modeling of the confi gurations proposed in the Vision Plan of the Art Deco Cultural District of the City of Miami Beach. Traffi c Engineer Lyons Rd. and Winston Park Blvd. Medley, FL This project involved replacing the existing span wire traffi c signal system with a new mast arm traffi c signal system. The scope of work included ADA upgrades, signalization improvements, intersection lighting analysis, structural support systems including foundations. Traffi c Engineer Polk St. and N. 24th Ave. Coconut Creek, FL This project involved replacing the existing span wire traffi c signal system with a new mast arm traffi c signal system. The scope of work included milling and resurfacing the intersection and approaches, ADA upgrades, signalization improvements, intersection lighting analysis, structural support systems including foundations, signing and pavement markings. Traffi c Engineer Las Olas Boulevard and SE 3rd Avenue Signalizations Fort Lauderdale, FL This project involved replacing the existing span wire traffi c signal system with a new mast arm traffi c signal system. The scope of work included milling and resurfacing the intersection and approaches, ADA upgrades, signalization improvements, intersection lighting analysis, structural support systems including foundations, signing and pavement markings, and more. Traffi c Engineer NW 31st Avenue and NW 19th Street Intersection Improvements Fort Lauderdale, FL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 78 E MS, Civil Engineering Michigan State University Master of Business Administration University of Central Florida BS, Civil Engineering National University of Sciences and Technology (NUST) L C State of Florida Professional Engineer #75281 State of Alabama Professional Engineer #30446 W H Traffi c Engineer Calvin, Giordano & Associates, Inc. 2023 – Present Chief Engineer Dubai Roads and Transport Authority (RTA) 2018 – 2023 Project Manager The Corradino Group 2012 – 2017 Project Manager Traffi c Planning and Design, Inc. 2007 – 2009 Project Planner Florida Department of Transportation 2006 – 2007 Traffi c Engineer Southeastern Engineering 2004 – 2006 Transportation Planner URS Corporation 2001 – 2004 Transportation Planner North Central Texas Council of Governments 1999 – 2001 CGA P E Traffi c Engineer City of Miami Beach, FL Traffi c Engineer Village of Miami Shores, FL Traffi c Engineer North Bay Village, FL Traffi c Engineer City of Homestead, FL Traffi c Engineer Town of Cutler Bay, FL Traffi c Engineer Village of Pinecrest, FL Traffi c Engineer City of Hollywood, FL Traffi c Engineer City of Dania Beach, FL Traffi c Engineer Town of Davie, FL Traffi c Engineer City of Weston, FL Traffi c Engineer Memorial Healthcare System in Hollywood, FL Traffi c Engineer City of Boynton Beach, FL Traffi c Engineer Saint Lucie County, FL P-CGA P E Project Manager Various Traffi c Engineering Projects Miami, FL Managed contracts up to $5M, providing expert reviews and technical leadership in traffi c engineering and transportation planning Advised government clients, represented cities at planning board and commission hearings, and led preparation of RFPs, scopes, and fee estimates. Oversaw project management, mentored junior staff, and supported quality control processes and business development efforts. Project Manager Various Traffi c Engineering Projects Maitland, FL Managed traffi c studies for construction development projects valued between $25M and $50M, overseeing contract scheduling, budget tracking, and project reporting to monitor progress against target dates. Project Planner Various Traffi c Engineering Projects Orlando, FL Managed technical review and coordination of DRIs for various construction projects up to $200M. S R, PE Traffi c Engineer Y E Y F E-U-H MSR City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 79 E BA, Architecture Florida Atlantic University, Boca Raton, FL AA, Architecture Broward County College AA, Architectural Engineering Miami Dade Community College, Miami, FL Structural CADD Technician Lindsey Hopkins Technical Vocational Institute, Miami, FL L C FDOT TTC/MOT Intermediate #630280 W H CADD Technician and Construction Inspector Calvin, Giordano and Associates, a SAFEbuilt Company 2021 – Current FDOT LAP Project Coordinator JCR Roadway / FDOT D4 2018 – 2021 FDOT LAP Project Coordinator Atkins Engineering 2014 – 2018 Transportation Engineering Assistant Dragados USA 2011 – 2014 Transportation Engineering Assistant Eptisa Engineering Associates 2009 – 2011 CADD Manager Transystems / Lichtenstein Structural Engineering 1998 – 2008 CADD Manager Parsons / /Sverdrup Corporation 1991 – 1997 Highway and Bridge CADD Designer Barton Ashcman Engineering 1985 – 1991 P E CADD Technician Various LAP Projects in District Four Treasure Coast Area FDOT District 4, FL Managing and coordination of the LAP project; SR-64 in Indian River County, Murphy Rd. Bridge in Martin County, Crosstown Parkway Bridge in City of Port St. Lucie. CADD Technician Broward County Mast Arm Conversion Broward County, FL Drafting for multiple intersections to updgrade mast arms. ADA upgrades, mill and resurfaces and new signage and pavement markings. CADD Technician I-595 Corridor Project Davie, FL Project Coordinator/CAD Manager that provided QA/QC to the construction plans to the I-595 Corridor Roadway Improvements project, which consists of the reconstruction and widening of the I-595 mainline and all associated improvements to frontage roads and ramps from the I-75 / Sawgrass Expressway interchanged to the I-595 / I-95 interchange for a total project length of approx 10.5 miles. CADD Technician Ocean Avenue (SR-804-Over the ICWW Boyton Beach Bridge Reconstruction Boyton Beach, FL CAD Manager to produce the CAD fi les for the construction plans. The objective of the design of the new bascule bridge construction was to design an innovative structure to improve safety and to provide sustainability to the volume of the existing traffi c capacity at the Boynton Beach area. Inspector Golden Shores Stormwater PS Rehab Sunny Isles Beach, FL CGA provided CEI services for the construction of a Pump Station Rehabilitation and Improvements Project. Oversaw that the project was delivered in conformance with the construction plans and specifi cations and special provisions for the construction contract. Observed the Contractor’s work to determine the progress and quality of work. Identifi ed discrepancies and reported signifi cant discrepancies to the Engineers of Record. Inspector Phase 5A Water Main Bal Harbour Village, FL CGA provided CEI services for the construction of water main Improvements. Mr. Lemus oversaw that the Project was delivered in conformance with the construction plans and specifi cations and special provisions for the construction contract. Observed the Contractor’s work to determine the progress and quality of work. Identifi ed discrepancies and reported signifi cant discrepancies to the Engineers of Record. Inspector WO#2 West Lakes Gardens 1st Addition Drainage Miami Lakes, FL CGA provided CEI services for the construction of Drainage Improvements. Mr. Lemus oversaw that the Project was delivered in conformance with the construction plans and specifi cations and special provisions for the construction contract. C L CADD Technician + Y E Y FCL City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 80 E BS, Business Administration Florida Atlantic University P E Traffi c Designer and CADD Technician Bay Harbor Islands Community Enhancement Project Phase II Bay Harbor Islands, FL Designed and permitted the roadway and utility improvements for 2.3 miles of roadways on the west island of the Town Traffi c Designer and CADD Technician Bay Harbor Islands Community Enhancement Project Phase III Bay Harbor Islands, FL Designed and permitted the roadway and utility improvements for 4.2 miles of roadways on the east island of the Town Traffi c Designer and CADD Technician Middle Beach Recreational Corridor Phase II and III Miami Beach, FL Mr. Rowbotham was responsible for designing all engineering efforts associated this 2-mile long linear multi-use trail project on State-owned lands. He also worked on the alignment, grading and materials (cut/fi ll) calculations Traffi c Designer and CADD Technician Broward County NW 31st Avenue and NW 19th Street Intersection Improvements Fort Lauderdale, FL Design and depiction of proposed sidewalks and pedestrian ramps at various intersections, including NW 31st Avenue and NW 19th Avenue, Las Olas Blvd. and SE 3rd Avenue, and N 24th Avenue and Polk Street. The project will replace the existing span wire traffi c signal system with a new mast arms traffi c signal system Traffi c Designer and CADD Technician SE 36th Street Avenue Streetscape Improvements (Gulfstream Boulevard) Boynton Beach and Delray Beach, FL Mr. Rowbotham designed a 1/3 mile 2-lane divided roadway along the City Boundary of Boynton Beach and Delray Beach with Shared-Use Pathways and Median Improvements. The scope of this project includes roadway improvements to SE 36th Avenue from Seacrest Boulevard to the west side of the FEC Railroad Tracks and ROW. Traffi c Designer and CADD Technician Tamarind Avenue West Palm Beach, FL Designed the addition of bicycle lanes and sidewalks for a ¾ mile segment of a 2-lane urban roadway with parking, along with replacement of the sanitary system, a 90+ year- old water main and improvements to the existing drainage system. Additionally, designed and coordinated the undergrounding of all aerial utilities along the corridor Traffi c Designer and CADD Technician A1A Bike Lanes Jupiter, FL Designed and permitted the expansion of turn lanes, the addition of bicycle lanes and sidewalks, drainage, undergrounding of utilities, force main relocation, and the replacement of a 10” asbestos cement water main for a ½ mile two lane undivided facility Traffi c Designer and CADD Technician South Pennock Lane Improvements Jupiter, FL Designed and permitted the addition of bicycle lanes and sidewalks to a ½ mile segment of the two lane undivided facility including the addition of a turn laney CADD Technician Midway Road PD & E Study St. Lucie County, FL Assisted with the management of the PD& E Study from 25th Street to east of US 1 L R CADD Technician Y E Y FLR E MS, Civil Engineering: Structural Florida International University BS, Civil Engineering University of Florida L C L C Florida Professional Engineer (PE) #59446 FDOT CTQP TIN # 21840 Earthwork Construction Inspection Level 1 Earthwork Construction Inspection Level 2 Final Estimates Level 1 Final Estimates Level 2 QC Manager FDOT TTC/MOT Advanced #659778 FEMA IS-100IS-100, IS-200, IS-700, IS-800 TS-G1 EOC, TS-G275 Operations Other IMSA Traffi c Signal Level 1 FDOT Emergency Response W H Construction Engineering and Inspections Lead Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2018 – Present P E Senior Project Engineer/Project Administrator Venetian Causeway HDD, Phase 2 City of Miami Beach, FL Horizontal Directional Drilling of HDPE 36” Water Main. 5300 LF and HDD HDPE 12” Force Main. 2,600 LF. Scope also includes Tie Ins, Fittings and Road Restoration to connect San Marco to San Marino, San Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. ` Senior Project Engineer/Project Administrator Sunset Isles HDD, Phase 2 City of Miami Beach, FL Horizontal Directional Drilling of HDPE 36” Water Main. 5300 LF and HDD HDPE 12” Force Main. 2,600 LF. Scope also includes Tie Ins, Fittings and Road Restoration to connect San Marco to San Marino, San Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. ` Senior Project Engineer I-75 Alligator Alley Environmental Education Project 43794-2-62-01, D4 Broward County, FL I-75 Alligator Alley Rest Area at mile marker 30. Scope includes reconfi guration of parking lots, realignment of access road, drainage structures, utilities, lighting, construction of a four story timber observation tower, bridge boardwalks, picnic facilities, and exhibit wetland area. Senior Project Engineer/Project Administrator Broward County Engineering and Signalization Broward County, FL Broward County Intersection re-construction of Foster Road, Tyler Road, and Fiber Optic Projects along Atlantic Blvd, Wiles Road Ph1,2, and Coconut Creek. Senior Project Engineer/Project Administrator Indian Trace Roadway Improvement, West 192 City of Weston, FL Project improvements included widening of roadway, turn lanes and extension of bicycle path, signalization cabinet foundation replacement, reconstruction of brick crosswalks with asphalt base, milling and resurfacing, pavement markings, including green bike lanes, and the installation of signing. In addition, the project included modifying existing drainage, and new curb and gutter construction, with new curb inlets. The sidewalks throughout the project were adjusted to accommodate ADA at the approaches and ramps. The project was 13,813 LF, or approximately 2.5 Miles long. Senior Project Engineer 23I-95 Safety Improvements 443847-1-52-01,D4, T4632 Port St. Lucie, FL I-95 from Gatlin Blvd to Saint Lucie West. Scope included overbuild corrections on the super-elevated curves, widening of the ramps, a new safety curve system that lights curve directional signs when speed is exceed or rain/weather triggers the system. Also included drainage, lighting, bridge widening for lighting over SFWMD canal, ITS, DMS Truss, and milling and resurfacing. Senior Project Engineer CEMEX; Schofi eld Road Improvements Lake County Permit Orange County, FL 5.8 miles from US 27 to the Orange County. Line complete road reconstruction and re-alignment with a super elevated curve. Urban and Rural Construction, included excavation, embankment, stabilization and lime rock base, structural asphalt and friction, along with new curb inlets, drainage, ponds, outfalls, and swales. Earthwork was 25’ cuts and 25’ fi lls. A 96” Concrete Pipe was installed for CEMEX material conveyor system. , E P, PE Y E Y F CEI Services Team Lead City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 81 E BS, Civil Engineering Polytechnic University Hato Rey, Puerto Rico L C Florida Professional Engineer (PE) #73249 FDOT CTQP TIN #50500 Concrete Field Inspector Level 2 Drilled Shaft Inspection Earthwork Construction Inspection Level 1 QC Manager FDOT TTC/MOT Advanced #604133 Florida Stormwater, Erosion, and Sedimentation Control Inspector Program Qualifi ed Stormwater Management Inspector #35729 W H Project Administrator Calvin, Giordano & Associates, Inc., a SAFEbuilt Company 2014 – Present P E Project Administrator SE Drainage Project Phase I Dania Beach, Florida This retrofi t project is located east of US-1 between 2nd Ave. and 5th Ave. and it will reduce the duration and severity of fl ooding during routine rain events and improve residents’ quality of life. The improvements include exfi ltration trenches, pump stations, and injection wells prior to connecting to the existing outfall. Senior Project Engineer FDOT District 4: SR-848 Stirling Road from W Of N 58th Ave to US-1 FDOT District 4, Florida The ongoing Stirling Road RRR project along SR 848 in Broward County, from Hollywood to Dania Beach, includes milling and resurfacing, pedestrian safety enhancements, and intersection upgrades. Scope covers new mast arms, rewiring, pedestrian signals, power upgrades, signage, roadway widening, curb and gutter, drainage, median reconstruction, and new curb ramps. Project Administrator I-75 Alligator Alley Environmental Education Project 43794-2-62-01, D4 Broward County, FL I-75 Alligator Alley Rest Area at mile marker 30. Scope includes reconfi guration of parking lots, realignment of access road, drainage structures, utilities, lighting, construction of a four story timber observation tower, bridge boardwalks, picnic facilities, and exhibit wetland area. Project Administrator Victoria Park Phase A (Project No. 10850) & Phase B (Project No. 11901) Watermain Improvements Fort Lauderdale, FL Elements included installing approximately 60,000 feet of 6-inch and 8-inch watermain to replace existing 2-inch mains, including new fi re hydrants, service connections to each home, and repaving of the roads impacted by the watermain improvements. Project Administrator General Assigned Contract; CA630; TWO #5; Project FM #445958-1-62-01 FDOT District 6, FL This TWO provided support to District construction. Project Administrator Florida’s Turnpike Enterprise; South Florida DMS Improvement and Replacement Location Homestead, FL Demolition and construction of 17 new ADMS Cantilevered Structures, CCTV camera poles, power services, ITS cabinets with transfer switch, and generator pads, along the approach streets to Sawgrass Expressway, Homestead exits at 288 Street and 137 Avenue, and Lake Worth Road. Project Administrator NW 110th Ave Road Improvements; Project FM #435088-1-58-01 Coral Springs, FL Contract elements included narrowing the existing 12-foot travel lanes to 11 feet and constructing a 6-foot wide sidewalk, a 4-foot bicycle lane, a drainage structure, installation, and curbing. Project Administrator US-1 Lighting Project from 24th St to A1A FDOT District 4, FL Project included new LED street lighting and retrofi tting of existing lighting to LED fi xtures. Project Administrator I-95/Pembroke Road Interchange Improvements FDOT District 4, FL Project included the installation of 8 new mast arms for signalization, installation of new lighting systems, widening the southbound and northbound I-95 off- ramps, guardrail installation, drainage improvements, milling, and resurfacing. Project Administrator Hallandale Beach Boulevard (from RR Crossing to Ansin Boulevard) FDOT District 4, FL Project included the installation of 8 new mast arms for signalization, installation of new lighting systems, extending the southbound I-95 off-ramp, widening of the northbound I-95 off-ramp, guardrail replacement, drainage improvements, milling, and resurfacing. Project Administrator US-441 (from 29th Street to North Oakland Park Boulevard) FDOT District 4, FL Project included the reconstruction of Hollywood Blvd (two travel lanes in each direction) to improve drainage, the addition of a median, outside parallel parking, 6-feet wide bike lanes, construction of new 12-feet wide sidewalks, tree planters, new signalization system, and new lighting system. H DS, PE, BSCE CEI Senior Project Engineer Y E Y F E-S B City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 82 E BS, Civil Engineering University of Puerto Rico L C OSHA OSHA 30 HR Construction Safety and Health OSHA 29 CFR 1926 Certifi cation NRC Nuclear Radiation Safety Certifi cate Sunshine 811 811 Sunshine Locate Certifi cate P E Backup Project Manager Indian Trace Roadway Improvement, West 192 Weston, FL 2025 – Ongoing Project improvements included roadway widening, new turn lanes, bicycle path extension, signalization cabinet foundation replacement, brick crosswalk reconstruction, milling and resurfacing, and new pavement markings with green bike lanes. Scope also covered drainage modifi cations, new curb and gutter with inlets, expanded parking bays for school crossing guards, a new brick-paver parking area with D-curb, and ADA-compliant sidewalk adjustments. Project length: 13,813 LF (2.5 miles). Project Administrator Venetian Causeway HDD, Phase 2 Miami Beach, FL 2024 – Ongoing Performed horizontal directional drilling (HDD) for 36” HDPE water main (5,300 LF) and 12” HDPE force main (2,600 LF), including tie-ins, fi ttings, and road restoration. Connected key utility segments: San Marco to San Marino, San Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. Project Administrator/Project Manager Indian Creek Seawall Miami Beach, FL 2025 Managed installation of a new seawall over an existing structure at Jefferson Avenue on the Collins Canal, utilizing precast concrete piles and structural wall panels. Oversaw rubble riprap placement, cast- in-place wall cap, and backfi ll, as well as demolition, repairs, and modifi cations to adjacent seawalls. Coordinated vibration testing, settlement monitoring, utility and irrigation adjustments, tree removal, and restoration of sidewalks, curbs, and road resurfacing to ensure project compliance and structural integrity. Backup Project Manager Canal Bank Stabilization Phase 3 Improvements Miami Lakes, FL 2024 – 2025 Managed stabilization of approximately 4,500 linear feet of the Golden Glades Canal south bank using a stacked Canal Bank Stabilization (CBS) system. Oversaw excavation, canal leveling, concrete CBS cell construction, bank and cell fi lling with stone and select materials, geofabric installation, and turf restoration. Adapted to fi eld conditions with on-site redesign of deeper-than-expected bank walls. Coordinated construction from barges due to limited site access, ensuring compliance with design elevations and environmental protection measures. Senior Inspector Henedon Bridge Restoration Miami Beach, FL 2024 Performed spall and crack repairs on both the topside and underside of the bridge deck, replaced sidewalks, repaired steel reinforcement as needed, and restored pedestrian railings. Addressed concrete pile spalls and defi ciencies in beams and columns to ensure structural integrity. Project Administrator Landscape Installation Miami-Dade County, FL 2020 – 2023 The Florida Department of Transportation (FDOT) carried out a landscaping project along SR 924/NW 119th Street in Miami- Dade County. The scope of work included the installation of approximately 2,000 small plants and 82 Solitaire Palm Trees within the median throughout the project limits. Project Administrator Landscape Installation Miami-Dade County, FL 2021 – 2022 Project along SR 826/Palmetto Expressway, extending from NW 31st Street to just north of NW 74th Street, including the FEC Railroad corridor. Project Administrator Pedestrian Lighting Retrofi t Miami-Dade County, FL 2021 – 2022 The project encompassed intersection improvement work at multiple locations within Miami-Dade County. Key project limits included SR 826/NE 163rd Street, NW/NE 167th Street, and NW 81st Street/ NW 82nd Street. C R-P, BSCE CEI Project Administrator Y E Y F E-S BCR City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 83 E BS, Civil Engineering University of Miami L C FDOT CTQP Asphalt Paving Level 1 Asphalt Paving Level 2 Concrete Field Technician Level 1 Drilled Shaft Inspection Earthwork Construction Inspection Level 1 Earthwork Construction Inspection Level 2 Final Estimates Level 1 Final Estimates Level 2 Pile Driving Inspection QC Manager American Concrete Institute (ACI) ACI Level 1 & Level 2 International Municipal Signal Association (IMSA) IMSA Traffi c Signal Inspector Level 1 Nuclear Gauge Safety Training / Nuclear Radiation Safety Florida Department of Environmental Protection (FDEP) Stormwater, Erosion and Sedimentation Control Inspector P E Senior Inspector / CSS FDOT District 4: SR-848 Stirling Road from W Of N 58th Ave to US-1 FDOT District 4, Florida The ongoing Stirling Road RRR project along SR 848 in Broward County, from Hollywood to Dania Beach, includes milling and resurfacing, pedestrian safety enhancements, and intersection upgrades. Scope covers new mast arms, rewiring, pedestrian signals, power upgrades, signage, roadway widening, curb and gutter, drainage, median reconstruction, and new curb ramps. Senior Inspector Indian Trace Roadway Improvement, West 192 The project involved modifying existing drainage, constructing new curb and gutter with inlets, elongating school crossing guard parking bays, and adding a new brick-paved parking area bordered by D-curb. Project improvements included roadway widening, addition of turn lanes, and extension of the bicycle path; signalization cabinet foundation replacement; reconstruction of brick crosswalks over asphalt bases; milling and resurfacing; pavement markings including green bike lanes; and installation of signage. Sidewalks were adjusted throughout to meet ADA requirements at approaches and ramps. The project spanned approximately 13,813 linear feet (2.5 miles). Senior Inspector Weston Rd & Royal Palm Blvd Interchange Improvement, West 224 The project included new drainage, new curb construction, median brick pavers, new bus bay with brick pavers and lighting, median and other landscaping and new irrigation mainline reconstruction. Project improvements included widening of turn lanes and bicycle path, construction of four new mast arms with foundations, including one for signs close to the I-75 off ramp. Also, reconstruction of brick crosswalks with asphalt base, milling and resurfacing, pavement markings, and installation of signing. Senior Inspector Project 2259921 Island Improvements Scope included utility upgrades for residents throughout the island, roadway drainage improvements, overbuild corrections, new curb and gutter, milling and resurfacing, new driveways, and construction of a specialized composite path with cast-in- place concrete base and sides. Work also involved demolition and installation of median islands with landscaping and irrigation, as well as new specialized lighting throughout the island. Given that the Village is known as the ‘Billionaire’s Bunker,’ the project required careful resident communication and coordination. Contract Support Specialist/Senior Inspector Hard Rock Stadium Pedestrian Bridges and Tunnels Project consisted of the construction of a pedestrian bridge over the Turnpike exit ramp and a pedestrian bridge over NW 199 St and two tunnels under Don Shula Dr. Senior Inspector FDOT District 4: I-75 Alligator Alley Environmental Education Project This project was located at the eastbound rest area at mile marker 30 on I-75 (Alligator Alley). Work included the construction of educational amenities and improvements to the existing facility, including reconfi gured parking lots, realigned access road, drainage structures, utilities, lighting, sidewalks, and tree relocation. The project featured a three-story observation tower with elevated boardwalks on a multi-span bridge supported by 200 auger-cast foundations, as well as an exhibit wetland area with educational signage, stone walls, and geofabric. Additional components included ITS DMS signs, CCTVs, and wireless parking sensors. Contract Support Specialist/Senior Inspector Collins Ave (SR A1A) Decorative Lighting (from Bayview Dr to 192 St) A project that included the removal of existing conventional lighting poles, installation of new pole foundations or rehabilitation of existing pole foundations, installation of new decorative poles, installation of electrical conduits and wires and MOT supervision. Contract Support Specialist/Senior Inspector Florida’s Turnpike Enterprise Project consisted of the demolition and construction of 17 new ADMS Cantilevered Structures, CCTV camera poles, power services, ITS cabinets with transfer switch, and generator pads, along the approach streets to Sawgrass Expressway, Homestead exits at 288 Street and 137 Avenue, and Lake Worth Road. A “R” S, BSCE CEI Senior Inspector Y E Y FRS City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 84 E BS, Civil Engineering National University, Colombia L C FDOT CTQP TIN #26197 Asphalt Paving Level 1 & 2 Drilled Shaft Inspection Earthwork Construction Inspection Level 1 & 2 FDOT Concrete Field Inspector Specifi cation Final Estimates Level 1 QC Manager P E CEI Senior Inspector Causeway Water Main and Sewer Main Replacement Phase 2 Miami Beach, FL 2024 – Ongoing Installed 5,300 LF of 36” HDPE water main and 2,600 LF of 12” HDPE force main using horizontal directional drilling (HDD), including tie-ins, fi ttings, and full road restoration. Senior Inspector Causeway Water Main and Sewer Main Replacement Phase 2 Miami Beach, FL 2024 – Ongoing Installed 5,300 LF of 36” HDPE water main and 2,600 LF of 12” HDPE force main using horizontal directional drilling (HDD), including tie-ins, fi ttings, and road restoration. Senior Inspector Venetian Causeway HDD, Phase 2 Miami Beach, FL 2024 – Ongoing Installed 5,300 LF of 36” HDPE water main and 2,600 LF of 12” HDPE force main using horizontal directional drilling (HDD), including tie-ins, fi ttings, and road restoration. Connected San Marco to San Marino, San Marino to Di Lido, Di Lido to Rivo Alto, and Bell Isle to Miami Beach. Senior Inspector Jefferson Seawall Miami Beach, FL 2023 Installed a new seawall at Jefferson Avenue on the Collins Canal using plumb and batter precast concrete piles and precast structural wall panels, including rubble riprap, cast-in- place wall caps with backfi ll, and concrete- fi lled gaps. Scope included demolition, repairs, and modifi cations to adjacent seawalls in a highly aggressive environment with strict environmental controls, including manatee monitoring and grate installation. Additional work included vibration testing, set verifi cations, tree and mangrove removal, utility and irrigation repairs or replacements, lighting adjustments, drainage, sidewalks, curbs, and resurfacing; walls were cast on- site by the contractor. Senior Inspector Indian Creek Seawall Miami Beach, FL 2025 The work consisted of installing a new seawall over an existing wall with plumb and batter cast precast concrete piles and pre-cast structural wall panels at Jefferson Avenue on the Collins Canal. The scope included rubble rip rap, a cast-in-place concrete wall cap with backfi ll and concrete fi lled gaps. It also included demolition, repairs, and modifi cation to existing adjacent seawall. Plus, vibration testing, settlement monitoring of structures, and set verifi cations, tree removal, repair or replacement of existing utilities or irrigation, lighting adjustment, drainage, sidewalk, curb, and resurfacing. Senior Inspector 77th St Bridge Repairs and Restoration Miami Beach, FL 2024 Performed spall and crack repairs on bridge deck topside and underside, as well as sidewalks; repaired steel reinforcement as needed, restored pedestrian railings, and addressed concrete pile defi ciencies using pile jacket repairs. Senior Inspector Henendon Bridge Repairs and Restoration Miami Beach, FL 2024 Rehabilitated Bridge #876821 over Biscayne Point Waterway, addressing deck and roadway defi ciencies, spall repairs on abutments, bents, beams, and spans, and exposed rebar repairs. Executed longitudinal, transverse, and multi-directional crack repairs, pile spall and crack repairs, cleaning and painting of metal attachments on timber planks, and replacement of expansion joints and signage. Completed concrete deck, sidewalk, and curb repairs and replacements. Senior Inspector Project 2259921, Island Improvements Indian Creek Village, FL 2022 – 2023 Delivered utility improvements for island residents, roadway drainage upgrades, overbuild corrections, new curb and gutter, milling and resurfacing, new driveways, and a specialized composite path with cast-in- place concrete base and sides. Managed demolition and installation of median islands with landscaping and irrigation, and implemented specialized lighting throughout the island. Project required careful resident communication and coordination in a high-profi le community known as the ‘Billionaire’s Bunker.’ J C M CEI Senior Inspector Y E Y FJM City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 85 E Weber State College, Ogden, UT Bachelor of Science, Manufacturing Egnineering Technology L C FDOT CTQP TIN #36998 Drilled Shaft Inspection Earthwork Construction Inspection Level 2 Final Estimates Level 1 Pile Driving Inspection CGA P E Senior Inspector Hard Rock Stadium Pedestrian Bridges and Tunnels Miami Gardens, FL 2018 – 2020 Project consisted of the construction of a pedestrian bridge over the Turnpike exit ramp and a pedestrian bridge over NW 199 Street and two tunnels under Don Shula Drive. Scope of work included: pile foundations, MSE walls, erosion control, drainage improvements, lighting, future signalization improvements, signage and pavement markings, precast concrete, curb and gutter, ADA sidewalk/ramp reconstruction, landscaping, sod, irrigation, temporary traffi c control, parking lot modifi cation/ resurfacing, striping, and signing, plus pre-stressed, pre-cast concrete tunnel segments, excavation, coffer dam with steel sheet piles, dewatering, concrete, barrier wall, electrical, lighting, drainage and pumps. Complete construction was completed prior to 2020 Superbowl. Senior Inspector City of Weston: Weston Rd & Royal Palm Blvd Interchange Improvement, West 224 Weston, FL 2023 - 2024 Project improvements included widening of turn lanes and bicycle path, construction of four new mast arms with foundations, including one for signs close to the I-75 off ramp. Also, reconstruction of brick crosswalks with asphalt base, milling and resurfacing, pavement markings, and installation of signing. In addition, the project included new drainage, new curb construction, median brick pavers, new bus bay with brick pavers and lighting, median and other landscaping and new irrigation mainline reconstruction. Senior Inspector Indian Creek Village: Island Improvements Indian Creek Village, FL 2022 - 2023 Scope included utility improvements to the island residents throughout the island, roadway drainage, overbuild corrections, new curb and gutter, milling and resurfacing, new driveways, new specialized composite path with cast-in-place concrete base and sides around the island. Demolition and installation of median islands with new landscape and irrigation. New specialized lighting throughout the island. The Village is also referred to as Billionaire’s Bunker, so it required good resident communication and awareness. Senior Inspector Town of Miami Lakes: Royal Pointe Roadway Drainage Improvements Miami Lakes, FL 2023 - 2024 Project consisted of Royal Pointe neighborhood drainage improvement. Scope included adding new drainage structures, pipe, and French-drain systems to help reduce the fl ooding issues in the surrounding area. Improvements also included base reconstruction, sidewalk repairs, concrete driveways, concrete curb, milling and resurfacing of the work area, pavement markings, and restoration of disturbed landscaping and irrigation. Senior Inspector Town of Miami Lakes: Alameda Northwest & W Lakes Gardens Drainage Improvements Miami Lakes, FL 2023 - 2024 Project consisted of Alameda Northwest and West Lakes Gardens 2nd Addition Drainage Improvements: Scope includes adding new drainage structures, pipe, and French-drain systems to help reduce the fl ooding issues in the surrounding area. Improvements also included base reconstruction, sidewalk repairs, concrete driveways, concrete curb, milling and resurfacing of the work area, pavement markings, and restoration of disturbed landscaping and irrigation. Senior Inspector Town of Miami Lakes: Canal Bank Stabilization Phase 3 Improvements Miami Lakes, FL 2024 - 2025 Project consisted of improvements to the stabilization of the south side of the Golden Glades Canal using a stacked canal bank stabilization (CBS) system. The limits of the stabilization are from NW 92nd Avenue to the end installation of Phase II at center of the property 16930 NW 83rd Avenue (approximately 4,500 total linear feet of canal bank). Scope included bank excavation, canal leveling, 57 stone leveling foundation, poured concrete CBS cells, 57 stone and select material bank and cell fi lling, geofabric installation for bank protection, turbidity protection, illegal irrigation caping, placement of fi ll and sod to conform to designed elevations. Contractor worked off barges due to limited workspace. Bank was deeper than shown, so wall was re-designed and fi eld built. Senior Inspector FDOT District 6: CEI Services for Okeechobee Road 1 FDOT District 6, FL 2021 - 2023 The improvements include adding acceleration and deceleration ramps and lanes including reconstruction of Okeechobee Road/SR 25 with rigid pavement and fl exible pavement, ITS systems, signalization, lighting, relocation of existing trees and palms and drainage improvements from Broward County Line to W of Turnpike. M H Y E Y F CEI Senior InspectorMH City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 86 L C FDOT CTQP TIN #1000003852 Asphalt Paving Level 1 Auger Cast Pile Inspector Concrete Field Technician Level 1 Drilled Shaft Inspection Earthwork Construction Inspection Level 1 Earthwork Construction Inspection Level 2 Pile Driving Inspection FDOT TTC/MOT Advanced #616950 CGA P E Senior Inspector Town of Miami Lakes: Canal Bank Stabilization Phase 3 Improvements Miami Lakes, FL 2024 - 2025 Project consisted of improvements to the stabilization of the south side of the Golden Glades Canal using a stacked canal bank stabilization (CBS) system. The limits of the stabilization are from NW 92nd Avenue to the end installation of Phase II at center of the property 16930 NW 83rd Avenue (approximately 4,500 total linear feet of canal bank). Scope included bank excavation, canal leveling, 57 stone leveling foundation, poured concrete CBS cells, 57 stone and select material bank and cell fi lling, geofabric installation for bank protection, turbidity protection, illegal irrigation caping, placement of fi ll and sod to conform to designed elevations. Contractor worked off barges due to limited workspace. Bank was deeper than shown, so wall was re-designed and fi eld built. Senior Inspector City of Miami Beach: Henendon Bridge Repairs and Restoration Miami Beach, FL 2024 Bridge #876821 rehabilitation, over Biscayne Point Waterway. Scope included repairing deck top and roadway defi ciencies, spall repairs on abutments, bents, beams, and throughout spans, and repairing exposed re-bar. Repairing longitudinal, transverse, and multidirectional cracks throughout the entire bridge. Repairing spalls and cracks on piles. Cleaning corrosion and painting metal attachments on timber planks. Replacing expansion joints and signs. Repairing and replacing concrete deck, sidewalk and curb. Senior Inspector Town of Miami Lakes: Royal Pointe Roadway Drainage Improvements Miami Lakes, FL 2024 Project consisted of Royal Pointe neighborhood drainage improvement. Scope included adding new drainage structures, pipe, and French-drain systems to help reduce the fl ooding issues in the surrounding area. Improvements also included base reconstruction, sidewalk repairs, concrete driveways, concrete curb, milling and resurfacing of the work area, pavement markings, and restoration of disturbed landscaping and irrigation. Senior Inspector Town of Miami Lakes: Alameda Northwest & W Lakes Gardens Drainage Improvements Miami Lakes, FL 2024 Scope included adding new drainage structures, pipe, and French-drain systems to help reduce the fl ooding issues in the surrounding area. Improvements also included base reconstruction, sidewalk repairs, concrete driveways, concrete curb, milling and resurfacing of the work area, pavement markings, and restoration of disturbed landscaping and irrigation. Senior Inspector Underline Project Miami-Dade County, FL 2025 - Ongoing The Underline is transforming the land below Miami-Dade’s Metrorail into a 10- mile linear park, urban trail, and public art destination. P-CGA P E Bridge Inspector FDOT District 6: I-395 MacArthur Causeway Bridge Reconstruction Miami-Dade County, FL 2019 - 2024 The I-395/SR 836/I-95 Project is a partnership between FDOT and the Greater Miami Expressway Agency (GMX), with construction limits on State Road (SR) 836 beginning at NW 17 Avenue and continuing through the SR 836/I-395/I-95 (Midtown)Interchange to the MacArthur Inspector Causeway Bridge. The limits on I-95 (from NW 8 Street to NW 29 Street). Duties included inspections on essential structures including drilled shafts, driven piles, Auger Cast Piles, Bridge Deck concrete pours, and mass concrete structures. Assisted management the coordination of the daily schedules of concrete testing technicians, ensuring adherence to project plans and specifi cations. Collaborated with the CEI team and contractors to troubleshoot and resolve issues that arose, maintaining seamless coordination. Inspector FDOT District 4: I-95 3C Express Lanes (S of Hollywood Blvd to S of Broward Blvd) Broward County, FL 2019 - 2024 Reconstruction, milling, resurfacing, overbuild, widening, and/or restriping of I-95 for 9 miles including one additional Express Lane in each direction (2 lanes total in each direction). A southbound Express Lanes entrance and a northbound Express Lanes exit location, serving Sheridan Street and interchanging to the north for traffi c to and from the south. A northbound Express Lanes entrance and a southbound Express Lanes exit location, serving Sheridan Street and interchanges to the south for traffi c to and from the north. Construction of dual exits for the northbound and southbound exit ramps to Sheridan Street. Dual right turn lane improvements at the ramp terminal for the I-95 northbound exit ramp movement to eastbound Griffi n Road. I-95/I-595 Direct Connectors between northbound and southbound 95 Express Lanes and I-595, to and from the west. L B Y E Y F CEI Senior InspectorLB City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 87 L C FDOT CTQP TIN # 41928 Asphalt Paving Level 1 Earthwork Construction Inspection Level 1 Pile Driving Inspection FDOT TTC/MOT Advanced #603428 P E Senior Inspector Underline Project Miami-Dade County, FL 2025 – Ongoing The Underline is transforming the land below Miami-Dade’s Metrorail into a 10-mile linear park, urban trail, and public art destination. Senior Inspector Hard Rock Stadium Pedestrian Bridges and Tunnels Miami Gardens, FL 2018 – 2020 Constructed pedestrian bridges over the Turnpike exit ramp and NW 199 Street, plus two tunnels under Don Shula Drive. Scope included pile foundations, MSE walls, erosion control, drainage improvements, lighting, signalization, signage, pavement markings, precast concrete, curb and gutter, ADA-compliant sidewalks/ ramps, landscaping, irrigation, temporary traffi c control, parking lot modifi cations, and pre-stressed precast tunnel segments. Additional work involved excavation, cofferdam with steel sheet piles, dewatering, concrete barrier walls, electrical, lighting, drainage, and pumps. Completed prior to the 2020 Super Bowl. Lead Senior Inspector I-95 Safety Improvements, Gatlin Blvd to St. Lucie West FDOT District 4, FL 2023 – 2024 Performed roadway widening and overbuild corrections to super- elevated curves, installed a new ITS safety curve system with speed and weather sensors, and executed bridge widening for lighting over the SFWMD canal. Additional work included truss installations with DMS, lighting and guardrail installation, and milling and resurfacing. Senior Inspector I-75 Alligator Alley Environmental Education Project FDOT District 4, FL 2021 – 2024 Led improvements at the I-75 Alligator Alley Eastbound Rest Area (mile 30), including construction of educational amenities, reconfi gured parking, realigned access roads, drainage, utilities, lighting, sidewalks, and tree relocation. Delivered a three-story observation tower with elevated boardwalks on a multi-span bridge with 200 auger-cast foundations, an exhibit wetland area with educational signage, and installed ITS DMS signs, CCTV cameras, and wireless parking sensors. Senior Inspector Schofi eld Road Improvements: CEMEX Four Corners Sand Mine Lake County, FL 2021 – 2024 Managed 5.8-mile roadway project from US 27 to the Orange County Line, including new 4-lane Urban Design construction (US 27 to Wellness Way) and 4.6-mile Rural Design (Wellness Way to county line). Scope included 15’ cuts and fi lls, road stabilization with clay soils and lime-rock base, structural and friction paving on mainline and turn lanes, paved shoulders, and new drainage system with curb, gutters, inlets, cross drains, outfalls, and ponds. Oversaw road realignment with super-elevated transitions and coordination with existing utilities until new utilities were installed at offsets. Senior Inspector CEI Services for Okeechobee Road 1 FDOT District 6, FL 2021 – 2023 Improvements included adding new acceleration and deceleration ramps and lanes, reconstructing Okeechobee Road/SR 25 with both rigid and fl exible pavement, and installing ITS systems, signalization, and lighting. Scope also included drainage upgrades and relocation of existing trees and palms along the corridor from the Broward County Line to west of the Turnpike. L R CEI Senior Inspector Y E Y FLR City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 88 L C FDOT CTQP TIN#1000002485 Asphalt Paving Level 1 Asphalt Paving Level 2 Drilled Shaft Inspection Earthwork Construction Inspection Level 1 Final Estimates Level 1 Final Estimates Level 2 FDOT TTC/MOT Advanced #655054 FDOT IMSA Traffi c Signal Bench Technician II Traffi c Signal Inspector Certifed Fiber Optic Technician W H CEI Senior Inspector Calvin, Giordano & Associates, Inc. 2022 – Present P E Senior Inspector Genesis Roadway Drainage Improvements Miami Lakes, FL 2025 – Ongoing Project consists of Genesis neighborhood drainage improvement. Scope includes adding new drainage structures, pipe, and French-drain systems to help reduce the fl ooding issues in the surrounding area. Addressing utilities and confl icts, base reconstruction, sidewalk repairs, concrete driveways, milling and resurfacing of the work area, pavement markings, and restoration of disturbed landscaping and irrigation. Senior Inspector Indian Trace Roadway Improvement, West 192 Weston, FL 2025 – Ongoing Roadway widening with new turn lanes and extended bicycle path, brick crosswalk reconstruction, milling/resurfacing, pavement markings, and updated signage. Included drainage improvements, curb and gutter installation, expanded parking areas, and ADA-compliant sidewalks and ramps. Total length: 13,813 LF (approx. 2.5 miles). Senior Inspector FDOT District 4: SR-848 Stirling Road from W Of N 58th Ave to US-1 FDOT District 4, FL 2024 – Ongoing Ongoing Stirling Road RRR project on SR 848 in Broward County, from Hollywood to Dania Beach, including milling and resurfacing, pedestrian safety improvements, and intersection upgrades. Scope covers new mast arms, rewiring, pedestrian signals, signage and lighting, roadway widening, curb and gutter, drainage, median reconstruction, and ADA- compliant curb ramps. Senior Inspector Weston Rd & Royal Palm Blvd Interchange Improvement, West 224 Weston, FL 2023 – 2024 Project included widening turn lanes and a bicycle path, constructing four mast arms with foundations, and reconstructing brick crosswalks. Additional work comprised milling and resurfacing, pavement markings, signage, drainage and curb improvements, median and bus bay brick pavers with lighting, landscaping, and irrigation mainline reconstruction. Senior Inspector Project 2259921 Island Improvements Indian Creek Village, FL 2022 – 2023 Scope included utility upgrades, roadway drainage improvements, curb and gutter installation, milling and resurfacing, new driveways, and a specialized composite path. Additional work included landscaped median islands with irrigation, new specialized lighting, and careful resident coordination due to the high-profi le community. Senior Inspector Jefferson Seawall Miami Beach, FL 2023 Installed a new precast concrete seawall at Jefferson Avenue on the Collins Canal, including rubble riprap, cast-in-place wall cap, and modifi cations to adjacent seawalls. Scope also included environmental compliance (manatee monitoring, grates), vibration testing, tree and mangrove removal, utility and irrigation adjustments, lighting, drainage, sidewalks, curbs, and resurfacing. Walls were cast on site in a highly aggressive environment. Senior Inspector Canal Bank Stabilization Phase Improvements Miami Lakes, FL 2024 – 2025 Improved stabilization of the south side of Golden Glades Canal (approx. 4,500 LF) using a stacked canal bank stabilization (CBS) system. Scope included bank excavation, canal leveling, poured concrete CBS cells, stone and select material backfi ll, geofabric installation, turbidity protection, fi ll and sod placement, and adjustments for fi eld-built wall due to deeper-than-expected bank. Work was completed from barges due to limited workspace. Inspector Foster Road and NW 2nd Ave Intersection Improvements Broward County, FL 2022 – 2023 This project consisted of drilled shafts with mast arm installation and retrofi tting, signization, milling and resurfacing, signing and pavement markings, pedestrian upgrades including signal and ADA detector installation, pull boxes, and conduit installation. Inspector Pine Island Rd & Atlantic Blvd Fiber Optic Improvements Broward County, FL 2022 This project consisted of fi ber optic cable installation, pull box removal and installation, concrete sidewalk removal and replacement, and traffi c controller assembly removal. L R CEI Senior Inspector Y E Y F E-S BLR City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 89 E BS, Electrical Engineering University of Oklahoma L C State of Florida Professional Engineer #45832 W H Electrical Engineer Calvin, Giordano & Associates, Inc. (CGA), a SAFEbuilt Company 2018 – Present President/Electrical Engineer Jorge R. Cervantes, P.E., Inc. 1996 – 2018 Electrical Engineer/Consultant/Designer Steven Feller, P.E., Inc. 1991 – 1996 Electrical Engineer/Consultant/Designer Todd W. Carey and Associates 1989 – 1991 Electrical Engineer/Consultant/Designer James H. Metz/DePouw, Inc. 1986 – 1989 P E Mr. Cervantes has served as an Electrical Engineer for numerous projects since joining the SAFEbuilt family of companies. These projects include: Pine Island Park Renovation in Plantation, FL Waterford Park Renovation in Davie, FL SW 2nd Avenue - FTL DDA in Fort Lauderdale, FL Middle Beach Recreational Corridor in Miami Beach, FL North Shore Open Space Park Renovations in Miami Beach, FL Bonaventure Park in Weston, FL Raymond P. Oglesby Preserve Park Renovation in Pembroke Park, FL Pedestrian Bridge in Bal Harbor Island, FL Three Island Reuse Water Main in Hallandale Beach, FL SW Quadrant Pump Station in Hallandale Beach, FL Golden Shores Pump Station Rehabilitation in Sunny Isles Beach, FL Since 2023, Mr. Cervantes has performed over 300 reviews for FL Public Schools and Universities, including: MEP Plan Reviewer for Sumter School District Sumter County Educational Support Center - Maintenance Transportation Center 23K046 Lake Panasoffkee Elementary 8 Classroom Building 22K058 South Sumter Middle 8 Classroom Building WMHS Workforce DEV CAPITAL B9 Renovation 24006-002 Wildwood Middle High School WMHS CTE COMP LAB RENO BLDG 10 Wildwood Middle High School WMHS Bld 2 WMH SCIENCE LAB RENO MEP Plan Reviewer for Charlotte County Public Schools Punta Gorda Center Fuel Facility PCHS Auditorium HVAC Repairs Charlotte High Aviation Hangar College of the Florida Keys EOC Center - Key West Campus Mr. Cervantes has also performed numerous reviews for other FL government entities, including: MEP Plans Examiner for FL Dept of Management Services Capital Complex Stairwell Pressurization Capital Complex East Entry- Security Improvements BP24-FDMS-1004.58 J C, PE Electrical Engineer Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 90 E MS, Public Administration Florida Atlantic University BS, Health Administration Florida Atlantic University L C Certifi ed Housing Development Professional #0812-03 W H Planning and Grant Administrator Calvin, Giordano & Associates 2020 – Present Director of Legislative and Community Affairs City of Deerfi eld Beach 2015 – 2020 Community Development and Housing Administrator City of Coral Springs 2013 – 2015 Community Development Coordinator City of Coral Springs 2005 – 2013 Special Projects Coordinator Community Redevelopment Associates of Florida, Inc. 2004 – 2005 P E Planning Consultant City of Lauderhill Provides ongoing planning assistance to the City including review zoning and land use applications, site plan review, preparation of reports and analysis for the City Planning and Zoning Division Planning Consultant City of Margate Currently working with the City on an update to substantial portions of the City’s Code Planning Consultant St. Lucie County Completed the County’s Emergency Management Local Mitigation Strategy which identifi es the natural hazards that may affect the county and assesses risks and vulnerabilities of the natural hazards Legislative and Community Affairs Director City of Deerfi eld Beach Developed and implemented the City’s intergovernmental relations efforts and ovresaw the City’s Grant Program, community outreach and Affordable Housing Programs Community Development and Housing Administrator City of Coral Springs Developed and managed community development and affordable housing programs; co-authored the City’s Affordable Housing Ordinance prepared the housing, intergovernmental and capital improvement elements of the Comprehensive Plan and Evaluation Appraisal Report Lighthouse Point Planning Consultant City of Lighthouse Beach Currently working with the City to update its Water Suppl Plan pursuant to state statutes in order to strengthen the links between regional water supply plans and comprehensive plans prepared by local governments M A Member American Planning Association (APA)- Florida Planning Association Member Florida Atlantic University School of Public Administration Member Florida Community Development Association Board Member National Forum for Black Public Administrators - South Florida Chapter Member Grant Professional Association V P-P Grant & Housing Administrator Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 91 E BS, Social Sciences Florida State University W H Grant Writer and Administrator Calvin, Giordano & Associates, Inc. 2025 – Present Project Director & Grant Administrator 21st Century Learning Centers 2021 – 2025 Program Coordinator Somerset Pines Academy 2021 – 2023 Grant Writer Freelance 2020 – 2021 P E Grant Writer and Administrator Calvin, Giordano & Associates, Inc., a SAFEuilt Company Contract with the City of Fellsmere, FL Grant Writer and Administrator Calvin, Giordano & Associates, Inc., a SAFEuilt Company Contract with the City of Homestead, FL Grant Writer and Administrator Calvin, Giordano & Associates, Inc., a SAFEuilt Company Contract with the Town of Jupiter, FL Grant Writer and Administrator Calvin, Giordano & Associates, Inc., a SAFEuilt Company Contract with the City of North Bay Village, FL Grant Writer and Administrator Calvin, Giordano & Associates, Inc., a SAFEuilt Company Contract with the City of Parkland, FL K L Grant Writer Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 92 E MA, Urban Planning University of California, Los Angeles BA, Geography University of California, Santa Barbara L C American Institute of Certifi ed Planners Certifi ed Planner #028501 W H Principal Planner Calvin, Giordano & Associates, Inc., a SAFEbuilt Company 2023 – Present Planner Cushing Terrell 2012 – 2022 Research Associate cityLAB-UCLA Department of Architecture and Urban Design 2010 – 2012 Intern City of Los Angeles, CA 2010 P E Miami Comprehensive Neighborhood Plan and EAR Update Miami, FL Updated the goals, objectives, and policies for the citywide plan for growth and redevelopment over 10- and 20-year planning timelines City Planner Lighthouse Point, FL Manages all current planning, zoning, and development services, including permit and site plan review, land development code updates, and EARs. Liaison to the City’s Economic Development Committee and Marine Advisory Board. Barrier Island Feasibility Analysis Hollywood, FL Analyzing zoning, existing built environment, real estate market and development patterns to evaluate the feasibility of development scenarios around several nodes across the barrier island. Land Development Code, Comprehensive Plan, and Master Plan Update Hallandale Beach, FL Updating the City’s zoning code, maps, development review process, standards, and vision documents to provide a complete suite of regulatory updates informed by community and stakeholder engagement Riviera 2040 Comprehensive Plan Update Riviera Beach, FL Updated the City’s long-range plan to refresh community vision and values. The plan balanced neighborhood health with industry and environmental resiliency, all informed by broad community engagement. Land Development Code Update Margate, FL Updated and reorganized the zoning and development regulations for clarity, legibility, and user-friendliness Town Planner Redington Shores, FL Manages the planning and zoning department and provides development review services. Includes land development code and comprehensive plan updates to facilitate post-storm resiliency and streamlined rebuilding. Town Planner Redington Beach, FL Oversee on-call and long-range planning services and zoning permit review, including land development code and comprehensive plan updates to facilitate post-storm resiliency and streamlined rebuilding Comprehensive Plan Update St. Lucie County, FL Updating the countywide long-range plan utilizing a specifi c analysis of land development potential within and outside of the Urban Service Boundary to evaluate the feasibility of extension. P-CGA P E Comprehensive Plan Update Chaffee County, CO Project Manager for update to the County’s comprehensive plan that was the culmination of 53 community engagement events, resulting in future land use maps for areas surrounding three municipalities, transportation improvements, and an infrastructure assessment and updated infrastructure. West Downtown Neighborhood Plan Boise, ID Lead Planner to create a redevelopment vision for a rapidly urbanizing neighborhood adjacent to Downtown Boise, including streetscape typologies, design guidance, and implementation through pedestrian- oriented land use code updates. M A Member American Planning Association Member Urban Land Institute D “D” D, AICP Ordinances/Codes/Standards Specialist Y E Y F City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 93 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 94 George San Juan, P.E., LEED A.P. President Experience George SanJuan founded Delta G Consulting Engineers Inc. in 1992. Mr. SanJuan has led the growth of the firm to twenty-four engineers and staff since October 1992. George SanJuan is an Electrical Professional Engineer with over Thirty-eight years’ experience as an electrical engineer, project manager and Principal-in- charge. Some of his projects include: •Over 40 Elementary and High Schools; Broward County, FL •Over 20 Broward County Parks/Recreational •Aishel House, 5 Story ALF/MC Facility, 110,000 SF. Lauderhill, FL •Morgan’s Cove, 4 Story ALF/MC Facility, 76,000 SF, St. Augustine, FL •Morgan’s Cove, 4 Story ILF Facility, 128,000 SF, St. Augustine, FL •Ocala ALF/MC Facility, 4 Story, 104,000 SF, Ocala, FL •Dania Beach Library, City of Dania Beach, LEED Silver Certified •Pompano Beach Transit Center Bus Canopy, Pompano Beach, FL •Broward Performing Arts, Program and Building Expansion Studies, Fort Lauderdale, FL •Broward County Edgar Mills Multipurpose Center, Design-Build Criteria Guidelines and Specifications; Broward County. •Weston City Hall, Weston, FL •Sunrise Public Works Facility, Sunrise, FL •Numerous Police Stations in Broward County, Florida •Over 26 Fire Stations in Broward County, Florida •Fort Lauderdale-Hollywood International Airport, Continuing Services 10 Year Contract, with over 100 Projects; Fort Lauderdale, FL •JAFCO, Respite and Residential Center for Children with Developmental Disabilities; City of Sunrise, FL Fire Stations •Miramar, Cooper City, Deerfield Beach, Lighthouse Point, Parkland, Pembroke Pines, Plantation, Tamarac, Coconut Creek, and other Fire Stations Mr. SanJuan is the Principal of the firm and spends most of his time assisting the project managers of our (4) fully staffed project teams and support personnel. His responsibilities also include QA/QC and specialty projects. Mr. SanJuan also works very closely with the client’s project teams and is instrumental in the management and coordination of projects from the initial kick off meeting through to final C.O. and commissioning of projects. Education: Bachelor of Science, 1988 from Florida Atlantic University, Associate of Arts in Business Administration from Florida Atlantic University, 1983 Registration: Professional Engineer Licenses held in 11 States LEED Accredited Professional (2006) Professional Affiliation: USGBC United States Green Building Council Engineering Experience: 38 years Interest: Fitness, Family, Jai Alai Professional Player, Soccer, Golf. Speaks English, Spanish, Italian City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 95 Stephen Bender P.E., LEED AP Project Manager/Mechanical Engineer Years of Experience: 30 / Years with Firm: 8 EDUCATION: Bachelor of Science in Mechanical Engineering – Rutgers University 1989 LICENSING & REGISTRATIONS: Professional Engineer Licenses held in 2 States PROFESSIONAL AFFILIATIONS: United States Green Building Council LEED Accredited Professional in 2007 Stephen Bender joined Delta G Consulting Engineers, Inc. in 2004 as a Mechanical Engineer. He has over 30 years of design experience in the Mechanical Engineering industry, including 9 years as a Project Manager for Delta G Consulting Engineers Inc. Experience Port Everglades 14th Street Sallyport project, Ft. Lauderdale, FL Project#210712 Provided professional engineering services for vehicular access control/sally port upgrade at Port Everglades in Fort Lauderdale, Florida. The scope of work includes replacement and upgrade of the existing security permit automated sally port system. The Government Center West Escalator Replacement Broward County, FL Project#200803 Complete gut and renovation of the interior area of the building of approximately 8,800SF. They are renovating a portion of the first floor to accommodate the mobility advancement plan (MAP) administrative team & the surtax oversight board. Broward County Government Center West First Floor MAP & Surtax Oversite Board Interior Remodeling Broward County, FL Project#200413 Complete gut and renovation of the interior area of the building of approximately 8,800SF. They are renovating a portion of the first floor to accommodate the mobility advancement plan (MAP) administrative team & the surtax oversight board. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 96 Simon Coleman possesses extensive project experience in structural and civil engineering throughout southern Florida. As a project manager and Engineer-of- Record (EOR), he has successfully designed and permitted a variety of projects, including private developments, county and municipal initiatives, and Department of Transportation (DOT) projects. His proficiency in navigating local, state, and federal permitting processes, including with the Army Corps of Engineers and the Florida Department of Environmental Protection, distinguishes him in the field. Simon excels in project management, client and subconsultant coordination, and civil/site design and permitting. His strong capabilities in drainage design and modeling complement his extensive structural experience, which includes the design of bridges, box culverts, boat ramps, marina structures, retaining walls, and bulkheads. Relevant Experience STA-1W Structures Refurbishment Project (Proj. No. 101280); Palm Beach County, FL Client: Palm Beach Count | Duration: 2024-2026 Structural Engineer/EOR. Provided oversight for the design of a series of box culverts and monitoring station platforms, including design of four box culvert control structures to control the flow between cells in Stormwater Treatment Area 1W. The culverts consist of double 10-foot by 4-foot barrels, 40-feet-long with automatic control gates on the upstream side. The culverts have steel sheet pile wing walls at each corner and a precast concrete control building on the top of the levee. Worked closely with the design team to develop concrete repair details for the control structures. Box Culvert Repairs (Work Order No. ECF 2024-001); Palm Beach County, FL Client: Port of Palm Beach EOR. Structural assessment of three concrete box culverts totaling 410 feet. Inspected culverts both visually and by using robotic rovers to evaluate the extent of corrosion and deterioration on the culvert interior walls. A comprehensive report was prepared for the Port, outlining recommendations for repairing certain sections and replacing others. Key considerations, including dewatering, safety, construction phasing, and minimizing impacts to Port operations during construction, were incorporated into the final construction documents. Access Bridge for S6 Pump Station (Proj. No. 101173); Palm Beach County, FL Client: South Florida Water Management District (SFWMD) | Duration: 2023-2024 EOR. Performed construction services as the engineer-of-record for a single lane bridge with four 35-foot spans consisting of Florida Slab Beams supported on reinforced concrete pile bents with 24-inch prestressed concrete piles. Work has included review and approval of all contractor submittals (including shop drawings, cost-loaded schedules, etc.) responding to RFIs, construction inspections and observations, coordinating and attending project meetings including pre-pile installation and pre-concrete pour meetings. The bridge replaces a box culvert at the entrance to the Spur Canal from the L-15 Canal to accommodate the widening of the Spur Canal as the intake supply to the future G-6A Pump Station. GM2 also designed the civil improvements associated with the project. This included the transitions to the exiting roads on either side of the bridge, the canal modifications and canal bank armoring and the earthwork and roads to maintain access to the S6 Pump Station during construction. Experience 33 years Education PhD, Civil Engineering, University of Nottingham, 1990 BS, Civil Engineering, University of Nottingham, 1987 Registration Professional Engineer: Florida (68929), 2008 Expertise →Project Management →Quality Control →Structural Design →Stakeholder Coordination →Constructibility Reviews →Cost Estimating Simon Coleman PhD, PE City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 97 Jose Peralta PE Jose has more than 13 years of experience providing inspection, assessment, and emergency response services for municipal infrastructure, including transportation structures. His experience includes leading field inspection teams for rapid evaluations following hurricanes, flooding, vehicular impacts, and observed structural distress, with an emphasis on public safety and operational continuity. Jose routinely serves in a team-lead role for emergency and special inspections, coordinating field activities, safety procedures, access logistics, and documentation. He is experienced in identifying structural deficiencies, impact damage, corrosion, and deterioration; evaluating structural capacity and serviceability; and providing clear recommendations for immediate safety actions, traffic or load restrictions, and repair prioritization. His work products include inspection memoranda, photographic documentation, and structural assessment reports suitable for municipal review. Jose is familiar with municipal bridge inspection programs consistent with Hillsborough County practices, FDOT procedures, and applicable AASHTO and Florida Building Code requirements. He also provides follow-up repair design, cost estimating, construction administration, and post-repair inspections, offering continuity from emergency response through permanent rehabilitation. Experience 13 years Education BS, Civil Engineering, Pontificia Universidad Catolica Madre Y Maestra, Dominican Republic, 2011 Registration Professional Engineer: Florida (91463) Additional license: Dominican Republic Certifications • OSHA 30HR Construction Safety • Certified Infrared Moisture Surveyor Expertise →Structural Engineering →Emergency Inspection Relevant Experience Cypress Wastewater Treatment Plant Canopy Foundations Slab; Hendry County, FL Client: Seminole Tribe of Florida | Dates: 2024-2025 Engineer of Record responsible for the structural analysis and design of the building’s foundation system and pavement slab to support maintenance equipment, as requested by the Seminole Tribe. The scope of this project was to design a new hurricane-rated canopy building structure and access driveway within a portion of the existing Wastewater Treatment Plant Facility (WWTP) located in the Big Cypress Reservation. The project includes expansion of the existing concrete pavement to accommodate the new canopy footprint. Brighton Solid Waste Transfer Station Canopy Foundations and Concrete Slab; Glades County, FL Client: Seminole Tribe of Florida | Dates: 2024-2025 Engineer of Record for the structural analysis and design of the building’s foundation system and pavement slab to support maintenance equipment, as requested by the Seminole Tribe. The scope of this project was to design the structures of a new hurricane-rated canopy building at the Solid Waste Transfer Station within the Brighton Reservation. The project includes expansion of the existing concrete pavement to accommodate the new canopy footprint. Driftwood Park Basketball Metal Canopy; Davie, FL Client: Town of Davie | Duration: 2022-2023 Project Engineer in charge of providing a complete design and preparing bid and construction documents, including architectural, electrical, structural, survey, geotechnical report, construction administration, and assisting in the permitting process to construct a new metal shade structure (the dimensions of the structure are estimated at 130 feet long by 70 feet wide for a total estimated square footage of 9100 square feet over the basketball court City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 98 Eric Liff, Principal Education: Bachelor of Science, Real Estate Management & Development; University of Southern California, Los Angeles, CA. 1990 Eric Liff brings 25 years of experience providing economic and financial advisory services to both the private and public sectors. He has worked with numerous national and international corporations providing economic, strategic and investment guidance in real estate acquisition, development planning and asset repositioning. His advising work also includes mixed-use and resort development throughout the U.S., Central America and the Caribbean. Over the course of his career, Eric has served as project manager to more than fifty municipal and governmental agencies on initiatives ranging from economic development and neighborhood revitalization to complex financial and partnership structuring. CAREER (1999 to Present) Principal. Lambert Advisory, LLC. Principal of this global economic and real estate advisory firm. Primary areas of focus include master planning and land use strategy, market and financial feasibility analysis (including residential, commercial, hospitality, and marinas), affordable housing, transaction/partnership structuring, and operations analysis. Major private and/or not-for-profit clients include: Swire Properties, WC Bradley Companies, Madison Marquette, LendLease, among others, Notable public sector clients include City of Miami, City of Naples, Broward MPO, City of Hollywood and City of St. Petersburg. (1998 to 1999) Director of Acquisitions. WorldStar Resorts, LLC. WorldStar is a resort/vacation ownership development Company, an entity of Starwood Capital. Responsible for acquisition and development activity, including corporate and/or asset identification, deal structuring, demand analysis, due diligence and strategic positioning. (1996 to 1999) Manager. KPMG Peat Marwick, LLP. Manager in the Real Estate Consulting Group of KPMG Peat Marwick and actively involved in acquisition, disposition, and underwriting engagements for firms such as CS First Boston, Morgan Stanley, Prudential, and Heller Financial. Additionally, Mr. Liff has managed a number of major workout transactions and litigation related support engagements. Member: Urban Land Institute (ULI); Florida Redevelopment Association (FRA) City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 99 Todd Peterson, Manager Education: Master in Urban & Regional Planning, University of New Orleans (New Orleans, Louisiana. 2008); Bachelor of Science, Natural Resource Management, Colorado State University (Fort Collins, Colorado 2000). Todd Peterson has over 15 years of experience in GIS mapping, coordination, analysis, and development. He also has an equivalent amount of time in transportation planning including TDM, transit, bicycle/pedestrian, and trail planning and development. His skills extend from property taxation and real estate analysis to transit planning routing and implementation. He is highly skilled at creating GIS data as well as synthesizing existing GIS data into useful datasets. CAREER (2014 to Present) Senior Advisor. Lambert Advisory, LLC. Primary areas of focus include developing and managing GIS-based maps for research and analysis for planning development and engineering markets based on location, demographics, and economics, conducting fieldwork and research including plan writing, infrastructure inventory/recommendation and analysis. (2010-2016) Contractor, OV Consulting and UrbanTrans. Both OV Consulting and UrbanTrans offer transportation planning services nation-wide. Primary duties include development and management of GIS-based maps for planning, transit, TDM studies, and engineering projects, fieldwork and research including bicycle and pedestrian infrastructure inventory/recommendation and parking and TDM analysis. Major projects such as CDOT’s high speed rail studies ICS/AGS, Lakewood Mobility Plan, Fort Collins Bike Share Study. (2010-2014) Executive Director, Clear Creek Coalition for Sustainable Development. Clear Creek Coalition for Sustainable Development was a grass roots organization formed to help organize community support for investment in transit and revitalization of underserved areas by encouraging sustainable, livable, attractive, walkable, and mixed-use development by community and governmental involvement. It provided community support for the largest TOD project in Adams County in coordination with RTD’s FasTracks. Primary duties included conducting advocacy, petitioning, and public meeting facilitation for partners and neighborhood residents, and managing the daily activities of the nonprofit such as communications, finances, and outreach. (2009-2010) Bicycle and Pedestrian Planner/GIS Manager, Greenways Inc. (2008-2009) Bicycle and Pedestrian Coordinator City of Winston Salem, North Carolina CERTIFICATIONS, AFFILIATIONS AND MEMBERSHIPS • Received “Designing Streets for Pedestrian and Bicycle Safety” certification in June 200 • Florida Master Naturalist Program-Completed Advanced Master Naturalist Certification 2016 • Association of Pedestrian and Bicycle Professionals (APBP) Member, 2009-2015 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 100 John Greist SOUTHEAST REGIONAL MANAGER BACKGROUND John’s expertise includes field operations, project coordination, project estimation, client management, scheduling, and employee management. He has successfully managed large turning movement count and machine count projects and is experienced in the collection of all service types offered by NDS. John has also assisted in the successful coordination and collection of specialized studies throughout Florida, piloting several new data technologies and techniques along the way. PROJECT EXPERIENCE Private Engineering Firms| AL, FL, GA, KY, NC, SC, TN | 2016 - Current John has been contracted by approximately 150 firms spread across 50 locations and by approximately 450 individual clients to conduct: 3000+: Turning movement counts 1000+: Volume, classification, and/or speed counts Hillsborough County TPO GPC | Hillsborough County, FL | 2023 - Current Project Coordinator. NDS has been subcontracted by Benesch to provide traffic data collection support for Hillsborough County. NDS has collected approximately: 620: Volume, speed, and/or classification counts 97: Turning movement counts with pedestrians, bicycles, & heavy vehicles 97: 1-day, 2-day, or 3-day Pedestrian and/or bicycle counts 2: Delay studies 1: Gap study 144 hours of video surveillance Knoxville Regional Transportation Planning Organization – Traffic Count Data Collection | Various Counties, TN | 2019 - Current Project Coordinator. Annual collection consisted of approximately: 140: 24hr Volume counts Knox County Government – Traffic Data Collection Services |Knox County, TN | 2019 - Current Project Coordinator. NDS is the on-call traffic data collection company for Knox County. Beginning in June of 2019, NDS has conducted approximately: 139: Turning movement counts with pedestrians, bicycles, and heavy vehicles 127: 24hr Volume, classification, and/or speed counts 4: 24hr Pedestrian counts Cobb County DOT RFQ | Cobb County, GA | 2023 - 2024 Project Coordinator. NDS was tasked with the collection of: 82: 24hr Volume and speed counts 7: 3-day Pedestrian counts with or without sub-classification of adults vs. school- aged Douglas County DOT | Douglas County, GA | March 2025 – April 2025 Project Coordinator. NDS collected the following for the Douglas County Department of Transportation: 45: 4hr Turning movement counts with pedestrians, bicycles, and heavy trucks 1: 12hr Turning movement count with pedestrians, bicycles, and heavy trucks City of Johns Creek | Johns Creek, GA | September 2025 – June 2026 Project Coordinator. NDS collected the following for the City of Johns Creek: 53: Turning movement counts with pedestrians, bicycles, & heavy trucks 36: 48hr Volume, classification, and/or speed counts EEDDUUCCAATTIIOONN Bachelors in Business Administration/Management Florida International University YYEEAARRSS OOFF EEXXPPEERRIIEENNCCEE 22 YYEEAARRSS WWIITTHH NNDDSS 10 PPRROOJJEECCTT MMAANNAAGGEEMMEENNTT 22 SSCCHHEEDDUULLIINNGG MMAANNAAGGEEMMEENNTT 22 DDAATTAA CCOOLLLLEECCTTIIOONN MMAANNAAGGEEMMEENNTT 12 PPRROOFFEESSSSIIOONNAALL AASSSSOOCCIIAATTIIOONNSS Member of ITE LLIICCEENNSSEESS && CCEERRTTIIFFIICCAATTIIOONNSS N/A City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 101 Kevin Deal CHIEF OPERATING OFFICER BACKGROUND Kevin has amassed a great deal of experience in every aspect of the data collection industry. His expertise includes field operations, administrative operations, program development, R & D and companywide quality control. He has successfully managed over 50,000 projects from inception to completion which have at times included customized study development as well as customized deliverables. Kevin oversees the annual collection of approximately 20,000 turning movement counts, 25,000 automatic traffic recorder counts, and thousands of specialized studies. PROJECT EXPERIENCE Knox County Government – Traffic Data Collection Services |Knox County, TN | 2019 - Current Project Manager. NDS is the on-call traffic data collection company for Knox County. Beginning in June of 2019, NDS has conducted approximately: 139: Turning movement counts with pedestrians, bicycles, and heavy vehicles 127: 24hr Volume, classification, and/or speed counts 4: 24hr Pedestrian counts NYSDOT - Traffic Count Collection Service | Statewide, NY | 2021 - Current Project Manager. NDS is the on-call traffic data collection company for the New York State DOT. Annual data collection consists of approximately: 2,800: 3-Day Class counts 2,500: 3-Day Volume counts 180: 50hr Non-Intrusive classification counts 100: Turning movement counts with varying collection requirements NYCDOT - Citywide Data Collection, Tabulation and Analysis Services | New York, NY | 2019 - Current Project Manager. NDS is the on-call traffic data collection company for the New York City DOT. NDS has completed approximately: 3,208: 7-day, 9-day, or 14-day Volume machine counts 2,860: 1-day, 2-day, or 3-day Turning movement counts requiring sub- classification of vehicles and pedestrians. 606: 1-day, 2-day, or 3-day Pedestrian counts 719: 1-day, 2-day, or 3-day Bicycle counts of requiring sub-classification of cyclists 184: Spot Speed Radar Counts Dallas DTPW - Traffic Counting Services | Dallas, TX | 2023 - Current Project Manager. NDS is the on-call traffic data collection company for the Dallas DOT and Public Works. NDS has conducted approximately: 3,059: Speed counts 894: Volume counts 676: Turning movement counts with pedestrians, bicycles, buses, and/or heavy vehicles (FHWA 5+) 481: Pedestrian & bicycle studies with or without exposure index analysis 19: Gap studies LADOT - On-Call Traffic Engineering Surveys | Los Angeles, CA | 2005 - Current Project Manager. NDS is the on-call traffic data collection company for the Los Angeles DOT. Under the current contract, which started in 2023, NDS has collected approximately: 165: Average daily traffic counts 272: Turning movement counts requiring heavy trucks, public transport buses, pedestrians (adults vs. school-aged), and bicycles. 90: Special studies including travel time studies and parking studies EEDDUUCCAATTIIOONN B.S. in Production & Engineering YYEEAARRSS OOFF EEXXPPEERRIIEENNCCEE 22 YYEEAARRSS WWIITTHH NNDDSS 22 PPRROOJJEECCTT MMAANNAAGGEEMMEENNTT 22 SSCCHHEEDDUULLIINNGG MMAANNAAGGEEMMEENNTT 22 DDAATTAA CCOOLLLLEECCTTIIOONN MMAANNAAGGEEMMEENNTT 22 PPRROOFFEESSSSIIOONNAALL AASSSSOOCCIIAATTIIOONNSS Member of ITE LLIICCEENNSSEESS && CCEERRTTIIFFIICCAATTIIOONNSS N/A City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 102 Anthony Truong SENIOR DATA ANALYST BACKGROUND Anthony is the head of our QC department for all data collected by NDS throughout the country. He is responsible for developing QC related procedures and techniques as well as the development of tools used to analyze the data. He is also responsible for companywide analyst training and direct supervision. DATA ANALYSIS EXPERIENCE NATIONWIDE 2019 - Current > 410,000 Asset inventory point features > 83,000 Automatic Traffic Recorders o Volume, Speed and/or Classification o Various durations > 53,000 Turning movement counts o Various classification and identification requirements Multi-modal FHWA Classifications Pedestrians (including sub classes) Bicycles (including sub classes) Flow/Contraflow Gender identification > 3,800 Pedestrian, Bicycle, Non-Motorist Screenlines > 35 Non-Intrusive Screenline studies o Wavetronix > 5,000 Radar Spot-Speed studies > 250 Travel-time corridors > 200 Origin-Destination studies of various sizes, various matching matrices, and various methodologies o License plate collection and matching o Camera vehicle tracking o Drone vehicle tracking o BlueTOAD Bluetooth vehicle tracking > 1,000 Queue studies > 500 Parking studies > 300 Delay studies > 200 Gap studies > 30 Saturation flow rate studies > 25 Vehicle occupancy studies > 400 Compliance study locations > 50 Ball-bank studies > 165 Drone surveillance/orthomosaic studies EEDDUUCCAATTIIOONN Bachelors in Finance Bachelors in Marketing YYEEAARRSS OOFF EEXXPPEERRIIEENNCCEE 12 YYEEAARRSS WWIITTHH NNDDSS 8 PPRROOJJEECCTT MMAANNAAGGEEMMEENNTT 8 DDAATTAA CCOOLLLLEECCTTIIOONN EEXXPPEERRIIEENNCCEE 8 DDAATTAA QQUUAALLIITTYY CCOONNTTRROOLL 11 PPRROOFFEESSSSIIOONNAALL AASSSSOOCCIIAATTIIOONNSS None LLIICCEENNSSEESS && CCEERRTTIIFFIICCAATTIIOONNSS N/A City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 103 FORMAL EDUCATION: University of Florida, Gainesville, Bachelor of Science, Civil Engineering PROFESSIONAL REGISTRATIONS: Registered Engineer- State of Florida #50858 Registered Building Inspector- State of Florida BN #3580 SBCCI #6528 ACI Level 1 #991175 UBCI PROFESSIONAL AFFILIATIONS: Florida Engineering Society *Past Chapter President National Society of Professional Engineers Deep Foundation Institute American Society of Civil Engineers Richard C. Wohlfarth, PE Principal/ Director of Engineering PROFESSIONAL EXPERIENCE: Mr. Wohlfarth, P.E. is the Director of the Engineering Department which includes ~50 professional and technical personnel. He also has overall responsibility for the Special Inspection, Construction Materials Testing and Geotechnical Engineering Divisions where he directs training, quality system review and personnel evaluations. His responsibilities include report review, signing and sealing geotechnical engineering, structural inspection and laboratory testing reports for the company, providing contract negotiation and administration, budget estimating and project management. Mr. Wohlfarth, a Delray Beach resident, has 38 years of experience (33 with NEF) in various aspects of geotechnical engineering which include determining feasibility of site development, foundation design analysis and recommendations, providing engineering evaluation for bridge and roadway construction, pavement design for roadways, roadway subgrade stabilization by geotextiles and other means, design of shoring systems for utility trenches and other deep excavations, dewatering methodology for trench and other excavations and backfill procedures, setting up and monitoring pile load tests, and providing value engineering for foundations. PROJECT EXPERIENCE: City of Hollywood: o Deep Injection Well Pump Station o N. 26th Avenue Drainage Improvements o Polk Street Boat Ramp On-Site Improvements o Monroe Terrace Water Main Replacement o Water Main Replacement between Johnson Street and Taft Street from N. 66th Avenue to N. 67th Terrace City of Coconut Creek: o Sablal Pines Park Boardwalk o Lyons Road Repair o Winston Park Road Repair o Coconut Creek Engineering Building Expansion City of Tamarac (on behalf of the City and/or through private clients): o Pump Station 454 Rehab o Proposed Mid-Walk Crosswalks o Tamarac Park Playground Renovation o Tamarac Sports Complex o Canal Improvement Phase VI (2 sites) o Veterans Park, Proposed Pedestrian Dock City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 104 FORMAL EDUCATION: Clarkson University, Potsdam, New York Studied towards a Master of Engineering Degree- Wastewater Treatment and Pollution Control Bachelor of Science-Civil- Environmental Engineering PROFESSIONAL REGISTRATIONS: Professional Engineer State of Florida #69447 ACI Concrete Field Testing Level 1 PROFESSIONAL AFFILIATIONS: Florida Engineering Society- Palm Beach Chapter American Society of Civil Engineers (ASCE) Christopher E. Gworek, PE Senior Project Engineering PROFESSIONAL EXPERIENCE: Mr. Gworek serves as Senior Project Manager/Engineer. His responsibilities include preliminary site studies, geotechnical explorations to determine site preparation, feasibility studies for land development, foundation design analysis and recommendations, supervision and training of drill crews, workload analysis, observation of piling installations, pile load tests, classification of in-situ soils and field/laboratory materials testing. Mr. Gworek’s experience includes construction layout, prepare surveys and as- builts for approval from clients, contractors and the county, collection of field data, layout of structures, buildings and roads and ensuring quality of work being performed in the field by maintaining correspondence between the office and the contractor. Mr. Gworek has 26 years of experience (23 with NEF; 3 with other). Mr. Gworek has been providing pre-condition video surveys and vibration monitoring services over the past 20 years. Named the 2014 “FES Palm Beach County Chapter Engineer of the Year”, Mr. Gworek has considerable experience in design of flexible (asphalt) and/or rigid (concrete) pavement. Mr. Gworek serves as project manager for numerous government projects within Palm Beach and Broward. PROJECT EXPERIENCE: City of West Palm Beach (Via City and/or Consultant): o Dreher Park: Proposed new shade structure o Mary Brandon Park: Proposed new playground equipment, including six to seven triangular canvas shades supported on ~14 posts o 31st – 35th Street Water Main Improvements, Phase 1 & 2 Various projects for the Palm Beach County Board of Commissioners: Qualification Based Contract (1986- 2000; 2011 - 2023) Environmental Assessments, Geotechnical Engineering, Material Testing, Structural Inspections. Projects include but are not limited to: o Sandalfoot Boulevard and SR7, SW 3rd and SR7 Bridge Replacement o Garden Road from South of FDOT Canal to South of Blue Heron Boulevard o Prairie Road over L.W.D.D. L-8 Canal Bridge Replacement o Clint Moore Road over LWDD E-4 Canal from East of Congress Avenue to East of LWDD E-4 Canal o Florida Mango Road over LWDD L-8 Canal from Edgewater Drive to Barbados Road Various WTP and WWTP, including but not limited to: o Water Treatment Plant #8, 1600 North Jog Road, West Palm Beach o Boca Raton Water Treatment Plant, 1401 Glades Road, Boca Raton o Water Treatment Plant #9, 22530 SW 65th Avenue, Boca Raton o Springtree Water Treatment Plant, 4350 Springtree Drive, Sunrise City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 105 City of Hallandale Beach, FL | RFP # FY 2024-2025-14 | CCNA Continuing Professional Architectural and Engineering Services | 92 YEARS OF EXPERIENCE: 11+ LICENSES / CERTIFICATIONS Certificate in Utility Locating Certificate in Advanced Pipe Cleaning Excavation / Trench & Confned Space CPR 30 Hour OSHA PROFESSIONAL AFFILIATIONS Underground Contractors Association South Florida American Society of Civil Engineers (Affiliate Member) Charles “Chuck” Faust, Jr. PROFESSIONAL EXPERIENCE US Utility Potholing & Air Excavation / 2014 – Present Business Development and Sales Utility Locating/ Coordinating Customer Relations Field Operations Storm Drain Cleaning 2017 Vacuum Excavation 2014 BC Surf & Sport / 2006 – 2014 Managed design and layout of BC Surf & Sport’s Flagship store in Ft Lauderdale. Launched BC Surf & Sports online presence Assisted in managing POS Software from DOS based to Windows Based Software (Celerant.) Regional Manager of 3 stores in South Florida. General Manager of BC Surf & Sport (FT Lauderdale) Buyer for Hardgoods Wetsuits Managed Marketing and Sales for online and in Store Was integral person in developing Licensed Billabong Store in Deerfield Beach which led to 3 more Billabong Licensed stores in South Florida. Instituted BC Surf & Sports presence in the Ft Lauderdale Boat Show Management Services of Indiana, Inc. / 1991 – 2009 Operated BC Surf & Sport of Coral Springs Managed Buildout and Design of 2 different locations in Coral Springs. Negotiated leases. Managed Software integration from DOS Based POS Software to Windows based Quickbooks Point of Sale. Managed buyers and retail staff Designed and Managed online retail store www.apertureboadshop.com Desinged and Managed online closeout website www.blowinitout.com Managed Skate Park for the City of Coral Springs under Skate Concessions LLC SUBSURFACE UTILITY EXPLORATION PROJECTS FDOT I-95 Express Way Lanes Broward County FDOT 826/I75 Express Lanes Project, Miami, FL Dania Beach Catch Basin 5, Dania Beach, FL Minto West, Loxahatchee, FL Mount Sinai Hospital, Miami Beach, FL Lead Subsurface Utility Exploration (SUE) Specialist City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 106 City of Hallandale Beach, FL | RFP # FY 2024-2025-14 | CCNA Continuing Professional Architectural and Engineering Services | 93 YEARS OF EXPERIENCE: 19+ LICENSES / CERTIFICATIONS Excavation / Trench & Confined Space CPR Marvin Parkins PROFESSIONAL EXPERIENCE US Utility Potholing & Air Excavation / 2025 – Present Designator InfraMap / 2018 – 2025 Lead designator in field. Used GPR, RD 8100,VIVAX and A10 to locate underground utilities. Provided detail sketches to clients of designated area. Able to proficiently set up MOT. Keith and Associates, Inc. / 2014 – 2018 Designator Experienced underground utility locator using equipment such as gpr-gssi, rd 8000 and vivax utility scanner. Provided thorough sketches after designating was complete. MOT certified. Main lead on vac truck in soft digs. Able to take lead initiative. Excellent problem solving skills in locating underground utilities. Cardno TBE / 2010 – 2014 SUE technician Worked as main lead on Vac truck. Completing soft digs and designating. DOT qualified. Independent Worker / 2006 – 2010 Repaired and remodeled homes. Projects included painting, putting up dry wall and knock-down, and installing tiles and wood flooring. Subsurface Utility Exploration (SUE) Designator City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 107 PROJECT EXPERIENCE S E N I O R I N S P E C T O R EDUCATION YEARS OF EXPERIENCE CONTACT CERTIFICATIONS Denis Sanchez has over 8 years of experience in the South Florida construction industry, serving as Field Supervisor and QC Manager on public and private projects. He has extensive expertise in testing and inspection for quality control and assurance of soils, asphalt, and concrete, and is highly proficient with the ERS system in MAC. DENIS SANCHEZ SR 5/US 1 Long Key Bridge/Overseas Hwy Bridge Repair, Monroe County, FL Field Supervisor/Project Coordinator – Oversaw testing and inspection of bridge substructure for the 4.6-mile Long Key/Overseas Highway repair project. MDX (GMX) Multiple Projects - Miami, FL (June 2016- September 2022) Senior Technician – Provided QA services as part of the GEC-B team for MDX, supporting multiple highway projects including SR 836 interchange modifications at 87th Ave, SR 874 ramp connector to SW 128th St, SR 836 modernization (NW 57th Ave to NW 17th Ave), and Dolphin Station Park and Ride Transit Facility. FDOT Districts 4 and 6 Materials Lab Material Testing and Construction Support – Districtwide (June 2016- September 2022) Senior Technician – Provided materials testing and inspection for FDOT Districts 4 and 6 under a $1.5M/5- year continuing contract. Managed MAC profiles, maintaining up-to-date production and reporting status. Bachelor of Education, Instituto Pedagogico, Matanzas, Cuba, 2009 Tin: S52216085 FDOT CTQP QC Manager CTQP Asphalt Plant - Level 1 & 2 CTQP Asphalt Paving - Level 1 & 2 CTQP Concrete Field Inspector - Level 1 & 2 CTQP Drilled Shaft Inspector CTQP Earthwork Construction Inspection - Level 1 & 2 ACI Concrete Field Testing Technician - Level 1 & 2 CTQP Pile Driving Inspector CTQP Auger Cast Piles Inspector 8 Florida’s Turnpike Enterprise (FTE) – Districtwide (June 2016-September 2022) Senior Technician – Provided materials testing and inspection for FTE on a $5M/5-year continuing contract, coordinating verification and independent verification of construction materials and operations per contract documents and FDOT standards. (786) 701-8639 (561)-317-5740 dma-ces.com denis.sanchez@dma-ces.com AVAILABILITY 90% City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 108 PROJECT EXPERIENCE S E N I O R I N S P E C T O R YEARS OF EXPERIENCE 5 CERTIFICATIONS EDUCATION CONTACT (786) 701-8639 dma-ces.com sergio.fundora@dma-ces.com AVAILABILITY 90% Sergio Fundora is a civil engineer with over 5 years of experience in project management , coordination, and construction inspection and testing. He has contributed to complex technical projects in Cuba, Miami-Dade County, Fort Lauderdale, Broward and Palm Beach counties, FDOT Districts 4 and 6, the Florida Turnpike, and MDX. SERGIO FUNDORA Mount Sinai Sea Wall Repair and Construction, Miami- Dade, FL Senior Inspector – Conducted field inspection and quality control testing for the repair and extension of an existing sea wall . Tin: F53679096 CTQP Earthwork Construction Inspection - Level I Augercast Pile Inspection CTQP Concrete Field Inspector - Level 1 CTQP Concrete Field Inspector - Level 2 CTQP Drilled Shaft Inspector SR 5/US 1 Long Key/Overseas Hwy-Bridge-Repair, Monroe County, FL Senior Inspector – Performed testing and inspection of bridge substructures for the 4.6-mile Long Key/Overseas Highway repair project . Bachelor of Civil Engineering, Central University of Las Villas, 2020 Port Everglades Southport Phase IX A, Broward County, FL Senior Inspector – Performed inspection of drilled shaft foundations for the development of new cargo handling container yards at Port Everglades. KWIA Concourse A and Terminal, Key West, FL Senior Inspector — The $100 million project will add a new concourse and improve the existing terminal of the Key West International Airport. The project is expected to be completed in 2025 and included testing and inspection services of construction materials incorporated herein. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 109 PROJECT EXPERIENCE S E N I O R I N S P E C T O R YEARS OF EXPERIENCE CONTACT (786) 701-8639 dma-ces.com daniel.dearmas@dma-ces.com CERTIFICATIONS Daniel De Armas has 5 years of experience in the construction industry, performing field testing and inspection of materials including concrete, asphalt, and soil to ensure compliance with project specifications and quality standards. DANIEL DE ARMAS SFWMD EAA A2IO Canal- Palm Beach, FL. Engineering Technician – Performed laboratory testing for materials used in the rehabilitation of the SFWMD A210 canal.FXE Runway 9-27 Pavement Rehabilitation- Broward, FL. Engineering Technician – Performed field testing of earthwork, concrete, and asphalt for the rehabilitation of Runway 9-27 at Fort Lauderdale Executive Airport. Tin: D65216196 CTQP Asphalt Plant - Level I CTQP Asphalt Plant - Level 2 CTQP Asphalt Paving - Level 1 CTQP Asphalt Paving - Level 2 CTQP Pile Driving Inspector 5 City of Coral Springs Fire Stations- Broward, FL. Engineering Technician – Performed field testing of earthwork and concrete for drilled shaft installations at multiple fire stations in Coral Springs. KW International Airport Terminal A and Concourse- Key West, FL Engineering Technician – Performed field testing of earthwork, concrete, and asphalt for the construction of a new terminal and runway/taxiway improvements at Key West International Airport. North Perry Airport- Broward, FL Engineering Technician – Performed field testing of earthwork, concrete, and asphalt for runway and taxiway rehabilitation at North Perry Airport. EDUCATION University “Marta Abreu” Las Villas, July 2020 S.R. 5/U.S. 1/Long Key Bridge Rehabilitation Project Engineering Technician - Performed concrete materials testing services for the Long Key Bridge rehabilitation project along U.S. Route 1 / Overseas Highway (MM 64.0) in Monroe County for FDOT. Provided quality control and concrete testing services during the construction phase to ensure compliance with FDOT standards. The project has an estimated construction value of $4.7 million. AVAILABILITY 90% City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 110 PROJECT EXPERIENCE I N S P E C T O R YEARS OF EXPERIENCE CONTACT CERTIFICATIONS AVAILABILITY 90% Alejandro Sablon has over four years of experience in the South Florida construction industry, performing field testing of construction materials including concrete, grout, asphalt , soil, and aggregates. ALEJANDRO SABLON SR-7/US-441 Transit Corridor Improvements- Broward, FL. Engineering Technician – Performed field testing of earthwork and asphalt for roadway widening, buffered bicycle lanes, new sidewalks, signage and pavement marking upgrades, and milling and resurfacing along Prospect Road. SR 93/I-75 Ramps at NW 138 Street- Broward, FL. Engineering Technician – Performed field testing of earthwork and asphalt for ramp widening at NW 138th Street. SR-5/US-1/Federal Hwy from Johnson St to SR- 822/Sheridan St- Broward, FL. Inspector – Performed field testing of earthwork for roadway improvements along SR-5/US-1/Federal Highway, including milling and resurfacing, 4-foot bicycle lanes, LED lighting upgrades, sidewalk and paver replacements, and decorative stamped asphalt crosswalks. (786) 701-8639 dma-ces.com Tin: S14500096 Augercast Pile Inspection CTQP Earthwork Construction Inspection - Level I CTQP Asphalt Paving Level I CTQP Asphalt Paving - Level 2 Augercast Piles Inspector 4+ S.R. 5/U.S. 1/Long Key Bridge Rehabilitation Project Inspector - Performed concrete materials testing services for the Long Key Bridge rehabilitation project along U.S. Route 1 / Overseas Highway (MM 64.0) in Monroe County for FDOT. Provided quality control and concrete testing services during the construction phase to ensure compliance with FDOT standards. The project has an estimated construction value of $4.7 million. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 111 PROJECT EXPERIENCE S R A S P H A L T P L A N T I N S P E C T O R EDUCATION YEARS OF EXPERIENCE CONTACT CERTIFICATIONS Anderson Villamizar has over 7 years of experience in the South Florida construction industry as an Asphalt Plant and Asphalt Paving Inspector. He brings extensive expertise in testing procedures and inspection for complex roadway projects for FDOT Districts 4 and 6, the Florida Turnpike, counties, and private clients. ANDERSON VILLAMIZAR FDOT Districts 4 and 6 Materials Lab Material Testing and Construction Support - Districtwide Asphalt Plant Inspector – Provided materials testing and inspection for FDOT Districts 4 and 6 under continuing contracts (CAH31-10, CAH31-5, CAH31-7) at multiple plants. Supported verification and independent verification of asphalt materials in compliance with FDOT standards and contract requirements. Florida’s Turnpike Enterprise (FTE) – Districtwide Asphalt Plant Inspector – Conducted materials testing and inspection to ensure asphalt production met FDOT standards. Coordinated verification testing under a $5M, 5-year contract. Catholic University of Tachira (U.C.A.T) Tachira Venezuela, 2011 Tin: V45200191 CTQP Asphalt Plant - Level 1 CTQP Asphalt Plant - Level 2 CTQP Asphalt Paving - Level 1 CTQP Asphalt Paving - Level 2 7 51684-6-52-01 LEAD ENGINEERING E6L38 441, GOLDEN DLADES INTERCHANGE – Miami Dade Asphalt Plant Inspector – Performed asphalt plant testing and inspections to ensure compliance with project specifications and producer Quality Control Plans. (786) 701-8639 dma-ces.com anderson.villamizar@dma-ces.com AVAILABILITY 90% S.R. 5/U.S. 1/Long Key Bridge Rehabilitation Project Senior Asphalt Plant Inspector - Performed concrete materials testing services for the Long Key Bridge rehabilitation project along U.S. Route 1 / Overseas Highway (MM 64.0) in Monroe County for FDOT. Provided quality control and concrete testing services during the construction phase to ensure compliance with FDOT standards. The project has an estimated construction value of $4.7 million. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 112 Below, we provide the names and addresses of the Sub-Consultants that CGA will be utilizing for this bid, as well as our Statement of Compliance regarding the use of Sub-Consultants in the RFQ. On the following pages, we present the Sunbiz and DBPR Registries for these esteemed firms. Names and Addresses Delta G Consulting Engineers, Inc. Services Providing: Mechanical, HVAC & Plumbing Engineers Headquarters Address: 1800 Eller Drive, Suite 570, Fort Lauderdale, FL 33316 GM2, Inc. Services Providing: Structural Engineering Services Local Address: 2056 Vista Parkway, Suite 300, West Palm Beach, FL 33411 Headquarters Address:115 Glastonbury Boulevard, Glastonbury, CT 06033 Lambert Advisory Services Providing: Financial, Economic, and Rate Studies Headquarters Address: 2199 Ponce de Leon Boulevard, Suite 201, Coral Gables, FL 33134 National Data & Surveying Services, Inc. (NDS) Services Providing: Traffic Data Collection Local Address: 10286 NW 47th St, Sunrise, FL 33351 Headquarters Address: 106 N Poinsettia Pl, Los Angeles, CA 90036 Nutting Engineers of Florida, Inc. Services Providing: Geotechnical Engineering Headquarters Address: 1310 Neptune Dr, Boynton Beach, FL 33426 US Utility Potholing & Air Excavation Services Providing: Subsurface Utility Exploration (SUE) Headquarters Address: 1888 NW 21st St, Pompano Beach, FL 33069 Diaz-Murphy & Associates (DMA) Services Providing: Materials Sampling and Testing Headquarters Address: 12318 SW 132nd Ct, Miami, FL 33186 Sub-Consultants Statement of Compliance If requested by City after Bid Opening and before Award, CGA shall submit to City additional detail on any or all Sub-Consultants or Suppliers including without limitation, pertinent information regarding similar projects, and other evidence of qualification for each such Sub-Consultant, Supplier, other persons or organization. If City, after due investigation, has reasonable objection to any proposed Sub-Consultant, Supplier, other persons or organization, it may request that CGA submit an acceptable substitute without an increase in Bid price. TAB 4 Approach / Methodology CGA’s Landscape Architecture, Engineering, Survey, Construction Administration, and Planning Services - Mills Pond Park in Fort Lauderdale, FL Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 114 Management Capabilities CGA understands that excellent project management skills are the cornerstone to any successful project. Prior to commencement and through the life of the contract, the CGA Project Manager will be in regular communication with the appointed representative for the City regarding project status and progress. All communication between the CGA Team and City Staff will occur through the CGA Project Manager. The CGA Team will be led by Jenna Martinetti, PE, who has over 22 years of engineering experience in Florida and will be the central coordinator for all the activities of this contract. Depending on the type of project request, Ms. Martinetti will assign the project to the respective disciplines’ team leader. CGA’s general approach to the design, development, and construction of related projects are outlined below. Variations will occur, depending on the requirements of a particular authorization. Project Scoping Upon receiving notification of a project, CGA’s Project Manager will meet with the City’s Project Manager to confirm the project scope, schedule, budget, and other requirements. The Project Manager will brief the CGA Team and begin to prepare the project scoping requirements. Due diligence will be performed before preparing a draft authorization for the City’s review and concurrence. Due diligence may include, but will not be limited to, conducting a project site visit, reviewing the record/back-up documents of the project, and researching permit documents. Authorization Once the project scope and concept documents have been agreed upon, we will then prepare authorization documents. These documents will include but are not limited to a description of the project, a project location map, the scope of services to be performed, a schedule of professional fees, and an engineer’s preliminary opinion of probable cost. Project Commencement / Kick-off Meeting All approved work orders will begin with a Project Kickoff Meeting, during which the CGA Project Manager will meet with the appropriate City staff. The Project Manager will then meet with the project team at the internal Kickoff Meeting. The Team will be introduced to the scope, budget, and timeline, and the Project Manager will define the various elements of the project and the QA/QC requirements at this meeting. The overall project schedule will be developed and confirmed with the team members. The Project Manager will regularly review the status of the project to ensure that the CGA Team is meeting the project’s schedule and budgetary requirements as initially defined and will update the City of the project’s ongoing progress. Fieldwork & Data Collection For authorizations involving the analysis of existing conditions, the design of proposed improvements, or management of ongoing work, CGA will perform a site field review. CGA will perform a site field review. Depending on the nature of the authorization, this may include observations of the site, traffic data collection, topographical survey, environmental assessment, and/or a survey of existing structures. Utility Coordination For any authorization that involves design, review, or project management of proposed improvements, CGA will coordinate with the various utility and subconsultant companies to determine the location of existing and future planned utilities. In certain projects, this will also include ground penetrating radar (GPR) and vacuum excavation of existing utilities (soft digs) for resolution of potential conflicts with proposed improvements. This data will be included on any right-of-way and design survey and will be used throughout the design, review, and project management process. Stakeholder Input Depending on the specific project type, it may be desirable to engage and include stakeholder input early in the process to obtain buy-in from those individuals most impacted by the project. This is particularly true of Planning projects, but applies to all possible projects. Construction projects, roadway projects, park improvement, and stormwater projects all require stakeholder input for smooth operation and execution. Schematics, aerial images, and renderings allow for input on the plan to meet the needs and requests made by stakeholders. Overall Approach to Completing the Project Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 115 Stakeholder Input (Continued) One often-underestimated “Stakeholder” is the City’s own maintenance staff. The CGA team requests meetings with staff involved in operation of the completed project to make sure they are satisfied and any special requests are incorporated early in the design process. When requested, CGA can also utilize our interactive resident voting devices to obtain quick and effective input from residents as well as create electronic surveys for obtaining anonymous input or input from stakeholders unable to attend meetings. Preparation of Preliminary Deliverables CGA will prepare preliminary plans and technical memorandums for review by the City prior to proceeding with the design to confirm the agreed upon scope of work is provided. Examples of these documents include but are not limited to: • Preliminary roadway and drainage alignment plans • Preliminary water, wastewater, and stormwater design plans • Preliminary landscape architectural design plans • Recommended typical cross section(s) for proposed roadway improvements Bidding/Award/Notice-to-Proceed When the scope of work requires a competitive bid process, the CGA Team can assist the City with the bid management process to include Advertisement, Pre-bid meeting and minutes, Response to bidders’ questions, Preparation and issuance of addenda, Evaluation of bids and preparation of a bid evaluation letter for award of the construction contract. Construction Administration During construction, CGA will be available to provide any necessary technical assistance and respond to questions from contractors and the City. CGA will aggressively pursue the completion of each phase of a project. Again, CGA has vast experience with local municipalities, and we are aware of the sensitive nature of budgets, neighborhood impacts, and schedules. Authorization Closeout Once all tasks have been completed, the Project Manager will work with the City’s representative to close out the project, including the punch list process and closing out any required grant applications and open permits. Delivering Services On Time and Within Budget During our time in business, we have built and maintained a trustworthy and reliable reputation throughout the State of Florida, giving our partners confidence in our ability to successfully and safely deliver services on time and within budget, day in and day out. We recognize the importance of staying on schedule and keeping up with the volume of work. Our team uses best practices to meet the City’s requirements, managing projects effectively and efficiently. CGA prides itself on quality, timeliness, and teamwork in our partnerships with clients to keep delivering the very best service to the City. Monitoring Schedule and Review Times CGA recognizes the importance of providing our clients with quality work that meets the agreed upon schedule. The CGA team has a proven record of completing projects on time or ahead of schedule. Our understanding of scheduling requirements and overall procedures, preferences, and standards has been acquired and perfected over our long history of working with clients on their critical projects. Due to our already strong presence in Florida, we can quickly and easily deploy qualified staff to support our on-demand contracts. Once assigned to a project, our core team members remain dedicated to that project until completion. If any personnel changes occur during the life of the contract, CGA will immediately notify the City of the situation. Approach to Meeting Desired Timelines and Deadlines Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 116 Proprietary Project Management Systems CGA utilizes SAFEtime and SAFEbill, which are proprietary time tracking and project management systems that allow real-time tracking of project budgets. These elegant tools will save the City money because they are included in the cost of the contract. These innovative state-of-the-art systems allow CGA to track current and projected resource requirements and help ensure that projects are completed on time and within budget. We recommend at least weekly communication between CGA’s project manager and a project manager designated by the City to track progress and anticipated project needs. Monitoring and Staying within Budget The CGA Team will communicate with the City’s Project Manager to identify the project budget early on. CGA will work with the City to understand the basis of the budget number to help ensure that additional scope is not added without consideration on how this affects the budget. A preliminary opinion of project cost will be prepared at the 30% document submittal milestone and will be updated and refined at each subsequent milestone submittal. The initial cost estimate will include sufficient contingencies to offset minor budget escalation at future updates due to market conditions. CGA keeps a database of unit prices that is updated after each project bid tabulation is created in order to stay current with the market’s unit prices. If a project is in jeopardy of being over budget, immediate attention is provided to address why and determine what steps need to be taken. At CGA, we prioritize transparency, responsiveness, and open communication to ensure the successful delivery of all projects for the City of Sunny Isles Beach. Our protocol for handling complaints and ensuring their prompt resolution is as follows: 1. Identification and Documentation Upon the identification of a complaint or concern—whether voiced by City staff, stakeholders, or identified internally by our team— it is immediately documented. This ensures that every issue is tracked from the moment of inception until final resolution. 2. Immediate Escalation to the City’s Project Manager We recognize that the City’s Project Manager must remain fully informed of all project-related issues. Therefore, any complaint received will be brought to the immediate attention of the City’s Project Manager via direct communication (phone and email) within 24 hours of being logged. This notification will include: • The nature and scope of the complaint. • The impact on the project timeline, budget, or quality. • Our proposed immediate corrective action. 3. Investigation and Resolution Following the notification of the City’s Project Manager, CGA will: • Conduct a thorough investigation to determine the root cause of the complaint. • Develop a formal Action Plan to address the issue, which will be submitted to the City’s Project Manager for review and approval. • Implement the approved solution with a focus on mitigating any negative impact on the project deliverables. 4. Follow-up and Verification Once the corrective action is completed, CGA will verify the resolution with the City’s Project Manager to ensure it meets the City’s standards and satisfaction. We will provide a summary report of the incident and the steps taken to prevent recurrence, ensuring full transparency throughout the remainder of the contract term. Approach to Handling Complaints TAB 5 References CGA’s Landscape Review, Arborist, and CEI Services - The Underline Phase 3 in Miami-Dade County, FL Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 118 Reference Questionnaires To make sure we meet the City’s stated preference regarding this MQR in Addendum #7, we present the completed Reference Questionnaires of four (4) of CGA’s clients, which represent three (3) clients apiece for each discipline upon which we are bidding. Combined, these 4 questionnaires in which the Proposer served as primary consultant for projects similar in size and scope within the last five (5) years, 2020 - 2025. Below, we present a list of which discipline(s) each questionnaire represents: Landscape Architects, General Civil Engineers, Surveyors and Mapping, and Transportation/Transit/Traffic Engineering: • City of Boca Raton, FL • Town of Davie, FL • City of Weston, FL Construction Engineering & Inspection (CEI) Services • Town of Davie, FL • City of Weston, FL • City of Miami Lakes, FL Please note: We have provided Construction Project Management services to City of Boca Raton, but not CEI services. You will find our four (4) questionnaires on the following pages. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 119 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Phone: ____________________________________________ Email: ___________________________________________ 1.Q: Rate the firm’s success in providing their services as it relates to the project. A: 10/10 - CGA always covers any and all aspects of a project. They are detailed and proactive 2.Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: 10/10 The EOR assigned for each project is accessible and approachable - CGA always offers superior customer service 3.Q: Would you use them again? A: Absolutely 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: 10/10 GCA is always good at estimating time a project may take and communicates when any owner- requested adjustments may be required. 5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: 10/10 As part of their continuing services engineering agreement they have tackled any and all types of project sent their way: water network design, sewer, forcemain and lift station, roadway, structures, drainage, etc. 6. Q: Is there anything else we should know, that we have not asked? A: It has been a pleasure working with CGA for the past 15 years. They are excellent engineers and always aim to please the customer while staying on budget and on schedule. The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ Calvin, Giordano & Associates, Inc. City of Boca Raton, FL 561.338.7307 tgarcia@ci.boca-raton.fl.us Utility Services Engineering ManagerTalia Garcia, PE 7/29/2026 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 120 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _Calvin, Giordano & Associates, Inc. Firm giving Reference: Town of Davie, FL Phone: 954.797.1146 Email: Jeffrey_Pohlman@davie-fl.gov 1. Q: Rate the firm’s success in providing their services as it relates to the project. A: CGA has been a continuing service provider for the Town of a number of years. The firm continues to provide exceptional design and engineering services for a plethora of projects. 2. Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: This multidisciplinary firm boasts a team of high performing professional who consistently provide exceptional services to the Town. CGA has been utilized for conceptual planning, design and engineering services, bid assistance, and project management to name a few. 3. Q: Would you use them again? A: Yes. 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: Yes. CGA consistently approaches projects as an extension of Town staff. 5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: Through regularly scheduled project meetings tasks are consistently completed in a timely manner and reflective of Town feedback and input. 6. Q: Is there anything else we should know, that we have not asked? A: The Town has utilized the services of CGA for many years, resulting in the completion of many successful projects to serve our residents. The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: Jeff Pohlman Title Director of Parks, Recreation & Cultural Arts Department Sign Name: Date: 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net Jeffrey Pohlman Digitally signed by Jeffrey Pohlman Date: 2026.07.29 23:20:01 -04'00'7/29/2026 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 121 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Phone: ____________________________________________ Email: ___________________________________________ 1. Q: Rate the firm’s success in providing their services as it relates to the project. A: 2. Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: 3. Q: Would you use them again? A: 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: 5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: 6. Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ Calvin, Giordano & Associates, Inc. Town of Miami Lakes, FL 305.512.7133 padrona@miamilakes-fl.gov Capital Improvement Project ManagerAnaily Padron, PE Excellent. The firm consistently delivered high-quality services that met the project’s needs and expectations. Excellent. The team was knowledgeable, responsive, and readily accessible throughout the project. Yes. We would confidently use Calvin, Giordano & Associates again. Excellent. The firm demonstrated a strong commitment to the project and its successful completion. They provided the appropriate level of staffing, attention, and resources necessary to successfully complete the work. Excellent. Services and deliverables were provided in accordance with the agreement and reporting requirements. Calvin, Giordano & Associates was professional, responsive, and dependable throughout the project. We would recommend the firm for similar CEI/ Professional Services. 8/12//2026 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 122 TAB 6 Contract Forms CGA was retained by the Town of Jupiter to provide all Civil Engineering services for its bike lane extension project on CR A1A from Indiantown Road to Jupiter Beach Road. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 124 Calvin, Giordano & Associates, Inc. City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 125 August 3, 2026 August 7, 2026 Addendum #9, Dated August 10, 2026 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 126 6.3 ACKNOWLEDGEMENT FORM - REVISED ADDENDUM 5 NAME OF COMPANY: ___________________________________________ (Name of Proposer Submitting RFQ) CHECK DISCIPLINES YOU ARE APPLYING FOR: 1-ARCHITECTS ____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: MECHANICAL, HVAC & PLUMBING ENGINEERS___ b.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: STRUCTURAL ENGINEERING SERVICES ___ 2-LANDSCAPE ARCHITECTS____ 3-GENERAL CIVIL ENGINEERS____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: MECHANICAL, HVAC & PLUMBING ENGINEERS___ b.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: STRUCTURAL ENGINEERING SERVICES ___ c.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT OR IN-HOUSE STAFF FOR SURVEYORS AND MAPPING___ d.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT OR IN-HOUSE STAFF FOR: GEOTECHNICAL SERVICES___ 4-ELECTRICAL ENGINEERS___ 5-SURVEYORS AND MAPPING____ 6-ENVIRONMENTAL / COASTAL ENGINEERING____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: GEOTECHNICAL SERVICES ___ 7- TRANSPORTATION / TRANSIT / TRAFFIC ENGINEERING____ 8- CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____ Calvin, Giordano & Associates, Inc. X X X X X X X X City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 127 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 39 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net QUESTIONNAIRE MUST BE INCLUDED WITH FIRM’S PROPOSAL Proposer must list projects of similar project scope fulfilling the following qualification requests: 1. List Project Management Personnel. Personnel cannot be changed without written approval. Assigned Project Manager: 1.2 Principal-in-Charge: 2. How many years has your organization been in business as a Consultant? 3. List current workload. 4. Is the Proposer subcontracting any part of this work? If so, give details to major key sub- Consultant’s name, address, phone number and type of work to be performed. Also, indicate the percentage of the total work to be performed by the sub-Consultant. 5. The business is a (sole proprietorship) (partnership) (corporation) and name of owner: Please see the Current Workload Table on the pages following this Questionnaire. Please see the Subcontracting List on the pages following this Questionnaire. Corporation Jenna Martinetti, PE David Stambaugh, PE, DBIA 89 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 128 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 40 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net 6. Has your company ever been debarred or terminated for default on a government contract? 7. Proposer must list any exceptions taken to the terms and condition in this RFQ. 8. Describe the Proposer’s attributes, which make the Proposer best-suited for this project. 9. Proposer is a Certified Minority Business: Yes _______ No_______ 10. Specify address of Proposer’s designated office where the majority of work on projects will be performed: 11. Consultant’s volume of work performed for the City of Sunny Isles Beach as a consultant and as a sub-consultant – currently and previously. END OF SECTION No Please see the List of Exceptions on the pages following this Questionnaire. Please see the List of CGA’s Attributes on the pages following this Questionnaire. X 800 Ellert Drive, Suite 600, Fort Lauderdale, FL 33316 Please see our Sunny Isles Beach Data Sheet on the pages following this Questionnaire. Name of Client Services Provided*Dates Contract Amount City of Sunny Isles Beach, FL Professional Services 2009 - Ongoing Multiple Contracts - Task Order Based. Bal Harbour Village, FL Professional Services 2015 - Ongoing Multiple Contracts - Task Order Based. City of Miami Beach, FL Professional Services 2004 - Ongoing Multiple Contracts - Task Order Based. Village of Palmetto Bay, FL Professional Services 2016 - Ongoing Multiple Contracts - Task Order Based. Village of Miami Shores, FL Professional Services 2022 - Ongoing Multiple Contracts - Task Order Based. City of North Miami, FL Professional Services 2011 - Ongoing Multiple Contracts - Task Order Based. City of Miami Gardens, FL Professional Services 2015 - Ongoing Multiple Contracts - Task Order Based. City of Weston, FL Professional Services 1996 - Ongoing Multiple Contracts - Task Order Based. Town of Davie, FL Professional Services 1996 - Ongoing Multiple Contracts - Task Order Based. City of Dania Beach, FL Professional Services 1996 - Ongoing Multiple Contracts - Task Order Based. City of Hallandale Beach, FL Professional Services 2009 - Ongoing Multiple Contracts - Task Order Based. City of Oakland Park, FL Professional Services 2011 - Ongoing Multiple Contracts - Task Order Based. City of Pembroke Pines, FL Professional Services 1991 - Ongoing Multiple Contracts - Task Order Based. City of Fort Lauderdale, FL Professional Services 2011 - Ongoing Multiple Contracts - Task Order Based. Town of Hillsboro Beach, FL Professional Services 2017 - Ongoing Multiple Contracts - Task Order Based. Broward County, FL Professional Services 2014 - Ongoing Multiple Contracts - Task Order Based. City of Margate, FL Professional Services 2018 - Ongoing Multiple Contracts - Task Order Based. City of Wilton Manors, FL Professional Services 2017 - Ongoing Multiple Contracts - Task Order Based. City of Lauderdale Lakes, FL Professional Services 2016 - Ongoing Multiple Contracts - Task Order Based. City of North Lauderdale, FL Professional Services 2018 - Ongoing Multiple Contracts - Task Order Based. Palm Beach County, FL Professional Services 2009 - Ongoing Multiple Contracts - Task Order Based. Palm Beach Gardens, FL Professional Services 2020 - Ongoing Multiple Contracts - Task Order Based. Town of Jupiter, FL Professional Services 2007 - Ongoing Multiple Contracts - Task Order Based. Town of Mangonia Park, FL Professional Services 2007 - Ongoing Multiple Contracts - Task Order Based. City of Boca Raton, FL Professional Services 2012 - Ongoing Multiple Contracts - Task Order Based. City of Stuart, FL Professional Services 2019 - Ongoing Multiple Contracts - Task Order Based. City of Oak Hill, FL Professional Services 2021 - Ongoing Multiple Contracts - Task Order Based. Current Workload Table Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 129 Over the years, CGA has provided relevant services (including Landscape Architects, General Civil Engineers, Surveyors and Mapping, Transportation/Transit/Traffic Engineering, Construction Engineering & Inspection (CEI) Services, Professional Grant Writing, Construction/Project Management/Administration, and more) to dozens of municipalities and counties throughout South Florida and beyond. Below, you will find a list of all of CGA’s current commercial clients. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 130 Below, we provide the required information for the Sub-Consultants that CGA will be utilitzing for this bid. Please note: The percentage of the total work to be performed by each Sub-Consultant is dependent upon the final scope of work issued by the City. Delta G Consulting Engineers, Inc. Headquarters Address: 1800 Eller Drive, Suite 570, Fort Lauderdale, FL 33316 Phone Number: 954.527.1112 Type of Work: Mechanical, HVAC & Plumbing Engineers GM2, Inc. Local Address: 2056 Vista Parkway, Suite 300, West Palm Beach, FL 33411 Headquarters Address:115 Glastonbury Boulevard, Glastonbury, CT 06033 Phone Number: 561.792.9000 813.240.2362 Type of Work: Structural Engineering Services Lambert Advisory Headquarters Address: 2199 Ponce de Leon Boulevard, Suite 201, Coral Gables, FL 33134 Phone Number: 305.503.4099 Type of Work: Financial, Economic, and Rate Studies National Data & Surveying Services, Inc. (NDS) Local Address: 10286 NW 47th St, Sunrise, FL 33351 Headquarters Address: 106 N Poinsettia Pl, Los Angeles, CA 90036 Phone Number: 954.356.2728 Type of Work: Traffic Data Collection Nutting Engineers of Florida, Inc. Headquarters Address: 1310 Neptune Dr, Boynton Beach, FL 33426 Phone Number: 561.732.7200 Type of Work: Geotechnical Engineering US Utility Potholing & Air Excavation Headquarters Address: 1888 NW 21st St, Pompano Beach, FL 33069 Phone Number: 954.849.2859 Type of Work: Subsurface Utility Exploration (SUE) Diaz-Murphy & Associates (DMA) Headquarters Address: 12318 SW 132nd Ct, Miami, FL 33186 Phone Number: 786.701.8639 Type of Work: Materials Sampling and Testing Subcontracting List Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 131 Exceptions The CGA Contracts and Legal team have reviewed the Sample Agreement provided by the City of Sunny Isles Beach, and respectfully notes the following exceptions in the table below. Deletions are stricken through, and additions are underlined. Refer to:Exception: Page 5 4.3 Delay Damages (Liquidated Damages). As to this Agreement, or Project Agreements or Letter Agreements, that have deadlines, time will be of the essence unless stated otherwise. In the event the work or Services are not completed within the time specified, the City will suffer damages, the amount of which is difficult if not impossible to ascertain. It is agreed, therefore, that from the compensation otherwise to be paid to the Consultant, the City may retain the sum of FIVE HUNDRED Dollars ($500.00) per calendar day for each day thereafter, Sundays and holidays included, that the Work or Services remains uncompleted. This sum shall represent liquidated damages that the City will have sustained per calendar day from the inconvenience and expense caused to the City by the delay in the completion of the Work or Services. This sum is not a penalty, being the liquidated damages the City will have sustained in event of such default by the Consultant. The City reserves the right to additionally recover direct expenses incurred during the period of any delay. The Consultant shall be liable for liquidated damages even if the Agreement, Project Agreement, or Letter Agreement is terminated by the City for cause or if the Consultant abandons the Work or Services. Page 6 5.3 Correction of Services. If, in the judgment of City, the Services provided by Consultant do not conform to the requirements of this Agreement, Project Agreement, or Letter Agreemente, or if the Services exhibit poor workmanship, City reserves the right to require that Consultant correct all such deficiencies in the Services to bring the Services into conformance without additional cost to City, and/or provided that such deficiencies are attributable to Consultant’s failure to perform the Services in accordance with the requirements of this Agreement, Project Agreement, or Letter Agreement. City may also request to replace any personnel who fail to perform in accordance with the requirements of this Agreement. City shall be the sole judge of non-conformance and the quality of Services. Any determination of non-conformance and the quality of Services shall be based upon the requirements of this Agreement, Project Agreement, and Letter Agreement, as applicable, and generally accepted professional standards applicable to the Services. Neither party shall have the sole authority to determine whether Services are non-confirming or deficient. The parties shall promptly confer in good faith to resolve the issue. Page 7 5.2.2 Notwithstanding the foregoing, the Consultant shall not be relieved of liability to the City for damages sustained by it by virtue of a breach of the Agreement by Consultant and the City may reasonably withhold payment to the Consultant for the purposes of set-off until such time as the exact amount of damages due the City from the Consultant is determined. withhold from amounts otherwise due to Consultant for purposes of set-off only those amounts mutually agreed upon by the parties or finally determined to be due and owing to the City. Any disputed amount shall not be withheld as a set-off unless and until such amount is mutually agreed upon by the parties or finally determined pursuant to the dispute resolution provisions of this Agreement. Page 12 14.1 To the fullest extent permitted by law, and in accordance with §725.08, Florida Statutes, Consultant shall indemnify and hold harmless the City, its officials, officers, and employees, from and against third-party damages, losses, liabilities, and costs, including but not limited to reasonable attorneys’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of Consultant, its employees, or other persons utilized by Consultant, including subcontractors, in the performance of this Agreement, or any Project or Letter Agreements. This provision shall survive the termination or expiration of this Agreement, or any Project or Letter Agreements. Page 20 35.1 The City and Consultant bind themselves, their successors, assigns, and legal representatives to the other party hereto and to successors, assigns and legal representatives of such other party in respect to covenants, agreements, and obligations contained in this Agreement. The Consultant shall not assign this Agreement without prior written consent of the City. Written consent shall not be unreasonably withheld or delayed. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 132 Below, you will find the Top 8 Attributes that make CGA stand out from its competition: 1. Multidisciplinary In-House Team for Seamless Integration Unlike many competitors, CGA offers a fully integrated, multidisciplinary team—including landscape architects, civil engineers, surveyors & mappers, transportation/transit/traffic engineers, CEI professionals, grant writers, construction administrators, and construction project managers—all under one roof. This integrated structure promotes efficiency; consistent, streamlined communication; faster turnaround; and holistic servicing that addresses infrastructure, environment, and community concerns in one cohesive strategy. 2. Proximity to Job Site CGA’s headquarters in Fort Lauderdale is less than fourteen (14) miles from Sunny Isles Beach City Hall. 3. Seventeen (17) Years of Experience with the City CGA is very proud to state that we have provided a broad, diverse array of services to the City since 2009. Because of this longstanding working relationship, we are notably familiar with each other’s workstyles, and our collaborative efforts have repeatedly proven to be successful and effective. Along those lines, by sticking with CGA, the City will not experience any lag time that occurs while transitioning to a new contractor. 4. Proven Long-term Success throughout South Florida From the beginning, much of our reputation was built on repeat business with clients from the public and private sectors in South Florida. Our success is reflected in both the quality of work we consistently provide and the personal approach we take with each client. The winning combination is affirmed by our large number of repeat/long-term municipal clients. Because of our diversity, CGA can control the entire process, offering a host of professional services as a one-source partner, or efficiently tackle time-sensitive individual projects, providing customized solutions with handpicked teams of highly experienced professionals. Taking advantage of our diversified staff’s experience and knowledge is what distinguishes CGA as a professional consultant and what allows our team to repeatedly complete projects on time, under budget and exceeding expectations while doing so. 5. Stability and Depth of Resources In 2018, CGA joined the SAFEbuilt family of companies, providing our clients with the stability and depth of resources of a national company with service delivery at a local level. CGA provides a comprehensive range of community development services to municipalities throughout Florida. We leverage our extensive local knowledge alongside the broader capabilities of SAFEbuilt to deliver each client the highest levels of service, expertise, and resources. As part of the SAFEbuilt family, we will focus on continued growth in Florida, implementing new technologies and expanding our services along the way to meet the ever-changing needs of our clients. We strive to develop new partnerships with organizations and businesses to provide superior services and create an even more comprehensive suite of solutions for our clients. As the world of construction continues to evolve, CGA remains committed to providing its clients with the best solutions, helping them achieve their goals and create a better future. 6. Perfectly Aligned Goals Our core values embody our approach to our working relationships, as well as our philosophy in providing services. Our team stands apart from others by remaining dedicated to a client-centered method based on our core values of Service, Integrity, Improvement, Teamwork, and Respect. Our goals are perfectly aligned with the goals of the City, and together we can meet your objectives to invigorate your culture through scalable, sustainable, and affordable business practices. 7. Nearly Nine Decades of Experience with Barrier Island Communities Founded in Hollywood in 1937, we have provided related services to barrier island communities (e.g., Hollywood Beach) for 89 years. For example, we understand the deIicate balance between land use, conservation, and resilience—particularly vital for a barrier island community. Our team is well-versed in providing services crafting plans that protect natural resources while aligning with federal, state, and local policies. 8. Effective Emergency Response CGA is proud of our history supporting municipal agencies in their time of need. In the aftermath of storms, CGA has been able to assist numerous municipalities in the recovery effort. CGA has repeatedly deployed our team of over 80 National Incident Management System (NIMS) and Federal Emergency Management Agency (FEMA) certified staff to properly document the damage, manage, and assist in the recovery effort. More specifically, CGA staff was part of the Hurricane Ian post-assessment and recovery effort in the Village of Estero and assisted Estero, as well as barrier island communities in the Tampa Bay region, in the aftermath of Hurricanes Debby and Milton. CGA’s support during these events assisted the municipalities in achieving their refund of recovery costs with FEMA funds.AList of Attributes Which Make CGA Best-Suited for This Project Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 133 • Planning • Environmental • Building 174th St Bridge Park Concept Sunny Isles Beach Pedestrian Bridge Emergency Seawall City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Contact Information Susan Simpson Deputy City Manager Tel No.: 305.792.1706 Email: ssimpson@sibfl.net CGA has provided continuing professional services to the City of Sunny Isles Beach since 2009. Services have spanned multiple City departments, including: • Civil Engineering • Traffic Engineering • Surveying Contract Amount: Multiple Contracts - specific contract information available upon further request from the City. Projects completed for the City include: • Landscape Architecture - North Bay Road Pedestrian Bridge • Landscape Architecture - Pedestrian Overpass Study • Landscape Architecture - Pedestrian Park Feasibility Study • Engineering Plan Review for Site Plan Approval • Building and Right-of-Way Permitting • City Engineer (temporary during the recruiting and hiring process for a permanent City employee for this position) • Golden Shores Pump Station Rehabilitation • Traffic Engineering - Citywide Speed Study • Boundary Survey - FDOT Parcels 653 & 654 • Boundary Survey - 230 174th Street • Entry Signs Survey • Survey & Plat Reviews • Planning - North Town Center Overlay Re-Visioning • Environmental - Emergency Seawall CGA has also won awards for our work for the City. These awards include: • In 2020, CGA won ASLA Florida’s Conceptual Category Award of Merit for our 174th St Bridge Park Concept. • In 2021, CGA won ASLA Florida’s Urban Design Category Award of Merit for Sunny Isles Beach Pedestrian Bridge. Golden Shores Pump Station Rehabilitation CGA’s Volume of Work Performed for the City of Sunny Isles Beach City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 134 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 135 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 136 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 137 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 138 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 139 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 140 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 141 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 142 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 143 Outstanding Litigation Although in the normal course of business, CGA is involved in litigation from time to time, generally from third parties, we have never been involved in litigation that would threaten our viability or the performance of this contract. History of Litigation Below, you will find a history of CGA’s Civil Litigation case for a five-year (5) period of time immediately preceding RFQ # 26-07-01: Case Name Case Number Nature of Action Settlement Amount Status Vega v. City of Pembroke Pines CACE 23-008466 Injury $160,000.00 Closed Alex Fuentes Reyes v. CGA CACE-23-007673 Auto accident $150,000.00 Closed Nance v. Frito-Lays 22-015977-CA-01 Wrongful death Information not available Open Keel v. CGA CACE-22-016214 Auto accident $1,000,000.00 Closed Leonel Gonzalez v. Geico General Insurance Company, CGA 2023-012587-CA-01 Wrongful death Information not available Closed Y. Reyes v. CGA Information not available Auto accident $2,000,000.00 Closed Gari v. CGA CACE 22-015422 Injury $110,000.00 Closed Keisha Laughton-Young v Pembroke Pines CACE-21-020880 Injury $120,000.00 Closed Detwiler- Erwin v. CGA CACE-21-017905 Negligence $75,000.00 Closed Litigation Table City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 144 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 145 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 146 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 147 TAB 7 No Contingent Fees CGA’s CEI Services for I-75 Alligator Alley Environmental Education Project in FDOT District 4 City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 149 TAB 8 Exceptions CGA was retained by the Town of Surfside to provide Surveying & Mapping Services for their Dune Survey & Beach Management Plan Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 151 Exceptions The CGA Contracts and Legal team have reviewed the Sample Agreement provided by the City of Sunny Isles Beach, and respectfully notes the following exceptions in the table below. Deletions are stricken through, and additions are underlined. Refer to:Exception: Page 5 4.3 Delay Damages (Liquidated Damages). As to this Agreement, or Project Agreements or Letter Agreements, that have deadlines, time will be of the essence unless stated otherwise. In the event the work or Services are not completed within the time specified, the City will suffer damages, the amount of which is difficult if not impossible to ascertain. It is agreed, therefore, that from the compensation otherwise to be paid to the Consultant, the City may retain the sum of FIVE HUNDRED Dollars ($500.00) per calendar day for each day thereafter, Sundays and holidays included, that the Work or Services remains uncompleted. This sum shall represent liquidated damages that the City will have sustained per calendar day from the inconvenience and expense caused to the City by the delay in the completion of the Work or Services. This sum is not a penalty, being the liquidated damages the City will have sustained in event of such default by the Consultant. The City reserves the right to additionally recover direct expenses incurred during the period of any delay. The Consultant shall be liable for liquidated damages even if the Agreement, Project Agreement, or Letter Agreement is terminated by the City for cause or if the Consultant abandons the Work or Services. Page 6 5.3 Correction of Services. If, in the judgment of City, the Services provided by Consultant do not conform to the requirements of this Agreement, Project Agreement, or Letter Agreemente, or if the Services exhibit poor workmanship, City reserves the right to require that Consultant correct all such deficiencies in the Services to bring the Services into conformance without additional cost to City, and/or provided that such deficiencies are attributable to Consultant’s failure to perform the Services in accordance with the requirements of this Agreement, Project Agreement, or Letter Agreement. City may also request to replace any personnel who fail to perform in accordance with the requirements of this Agreement. City shall be the sole judge of non-conformance and the quality of Services. Any determination of non-conformance and the quality of Services shall be based upon the requirements of this Agreement, Project Agreement, and Letter Agreement, as applicable, and generally accepted professional standards applicable to the Services. Neither party shall have the sole authority to determine whether Services are non-confirming or deficient. The parties shall promptly confer in good faith to resolve the issue. Page 7 5.2.2 Notwithstanding the foregoing, the Consultant shall not be relieved of liability to the City for damages sustained by it by virtue of a breach of the Agreement by Consultant and the City may reasonably withhold payment to the Consultant for the purposes of set-off until such time as the exact amount of damages due the City from the Consultant is determined. withhold from amounts otherwise due to Consultant for purposes of set-off only those amounts mutually agreed upon by the parties or finally determined to be due and owing to the City. Any disputed amount shall not be withheld as a set-off unless and until such amount is mutually agreed upon by the parties or finally determined pursuant to the dispute resolution provisions of this Agreement. Page 12 14.1 To the fullest extent permitted by law, and in accordance with §725.08, Florida Statutes, Consultant shall indemnify and hold harmless the City, its officials, officers, and employees, from and against third-party damages, losses, liabilities, and costs, including but not limited to reasonable attorneys’ fees, to the extent caused by the negligence, recklessness, or intentionally wrongful conduct of Consultant, its employees, or other persons utilized by Consultant, including subcontractors, in the performance of this Agreement, or any Project or Letter Agreements. This provision shall survive the termination or expiration of this Agreement, or any Project or Letter Agreements. Page 20 35.1 The City and Consultant bind themselves, their successors, assigns, and legal representatives to the other party hereto and to successors, assigns and legal representatives of such other party in respect to covenants, agreements, and obligations contained in this Agreement. The Consultant shall not assign this Agreement without prior written consent of the City. Written consent shall not be unreasonably withheld or delayed. APPENDIX Additional and Sub-Consultant Team Member Licenses CGA Survey Project Using High-Definition Laser Scanner and Company Vehicle - Fort Lauderdale, FL CGA’s Additional Individual Team Member Licenses In this Appendix, we present the licenses of the proposed team members that were not presented in the MQR section of Tab 2. Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 153 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 154 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 155 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 156 Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 157 Delta G’s LEED Certifications and PE Licenses Calvin, Giordano & Associates, Inc. A SAFEbuilt Company City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 158 GM2’s PE Licenses Nutting’s PE Licenses City of Sunny Isles Beach, FL | RFQ # 26-07-01 | Continuing Professional Architectural and Engineering Consulting Services (CCNA) | 159 Building Custom Solutions