Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ross Engineering, Inc. Bid Document (19)
Ross Engineering, Inc. 17670 NW 78th Ave., Ste 214, Miami, FL 33015 O: 786.468.8304 F: 305.392-1019 www.rossengineers.com CITY OF SUNNY ISLES BEACH REQUEST FOR QUALIFICATIONS RFQ 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Discipline Pursuing: Civil Engineer August 14, 2026 | 11:00AM 2 PROPOSAL COVER .............................................................................................1 TABLE OF CONTENTS ........................................................................................2 COVER LETTER .................................................................................................... 3 1. COMPANY INFORMATION ..............................................................................5 2. QUALIFICATIONS .............................................................................................11 MQR 1 (12-15) MQR 2 (16-21) MQR 3 (22, 63-67) QUALS (23-34) 3. STAFFING .........................................................................................................35 4. APPROACH/METHODOLOGY .........................................................................53 5. REFERENCES ..................................................................................................63 6. CONTRACT FORMS ........................................................................................68 7. NO CONTINGENT FEES ..................................................................................97 8. EXCEPTIONS ...................................................................................................99 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Consulting Services for Architectural and Engineering Services (CCNA) Discipline Pursuing: Civil Engineer Table of Contents 3 Ross Engineering, Inc. |3325 S University Drive, Suite 111, Davie, FL |954-318-0624 17670 NW 78th Ave., Ste 214, Miami, FL 33015 | P: 786.468.8304 | F: 305.392-1019 | www.rossengineers.com August 14, 2026 City of Sunny Isles Beach Procurement Department 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: RFQ No. 26-07-01 – Continuing Professional Architectural and Engineering Consulting Services (CCNA) Discipline 3 – General Civil Engineers Dear Members of the Evaluation Committee: Ross Engineering, Inc. is pleased to submit our qualifications to the City of Sunny Isles Beach for RFQ No. 26- 07-01, Continuing Professional Architectural and Engineering Consulting Services, under Discipline 3 – General Civil Engineers. As the City’s incumbent continuing civil engineering consultant, selected under the prior RFQ No. 20-07-01, Ross brings established familiarity with the City’s infrastructure, coordination procedures, project delivery expectations, and local conditions. We welcome the opportunity to continue supporting the City with responsive, practical, and cost-effective professional engineering services for its roadway, drainage, stormwater, utility, infrastructure, facility, and capital improvement needs. Established in 2003, Ross Engineering is a Florida civil and environmental engineering consulting firm with more than two decades of experience serving municipalities, counties, public works agencies, educational institutions, parks, utility providers, and other public-sector clients throughout South Florida. From our Miami- Dade County office, Ross can mobilize quickly for meetings, field investigations, emergency or time-sensitive assignments, and coordination with City staff, regulatory agencies, utilities, contractors, and other project stakeholders. Ross has assembled a focused multidisciplinary team tailored to the services anticipated under this continuing services contract. SGM Engineering, Inc. will serve as Ross’s subconsultant for Mechanical, HVAC, and Plumbing Engineering, providing specialized support for assignments involving mechanical systems, HVAC, plumbing, pumping and piping systems, municipal facilities, and related study, design, and construction- phase services. Thomas J. Kelly, Inc. will serve as Ross’s subconsultant for Surveying and Mapping, providing professional surveying services including topographic, boundary, right-of-way, design, and construction- related surveys and mapping. Together, these firms complement Ross Engineering’s core civil engineering capabilities and provide the City with a coordinated team for civil, MEP, and surveying needs. Ross will remain the Prime Consultant and civil engineering lead, integrating all supporting services into a unified scope, schedule, quality-control process, and set of project deliverables. Ross’s qualifications are further strengthened by our successful performance under the City’s current continuing civil engineering contract. Through this relationship, our team has developed first-hand knowledge of the City’s infrastructure, coastal drainage conditions, roadway constraints, permitting environment, and coordination requirements. One representative assignment is the NE 172nd Street Roadway and Drainage Improvements Project, where Ross provided professional civil and roadway drainage engineering services within a constrained municipal corridor near the Intracoastal Waterway. Services included topographic and route surveying, ICPR hydrologic and hydraulic analysis, roadway and drainage design, evaluation of existing exfiltration trenches and gravity drainage wells, pump system improvements, permitting, preparation of signed and sealed construction documents, bidding and preconstruction assistance, shop drawing review, field observations, as-built review, final walkthrough, punch-list preparation, and closeout assistance. That assignment provided Ross with valuable familiarity with the City’s infrastructure, coastal drainage conditions, roadway constraints, review procedures, and coordination requirements. It also demonstrates our ability to work effectively with the City, Miami-Dade County regulatory agencies, the Florida Department of Environmental Protection, contractors, utility representatives, surveyors, and other stakeholders to deliver improvements that are practical, permittable, constructible, maintainable, and responsive to the needs of the community. 4 Ross Engineering, Inc. |3325 S University Drive, Suite 111, Davie, FL |954-318-0624 17670 NW 78th Ave., Ste 214, Miami, FL 33015 | P: 786.468.8304 | F: 305.392-1019 | www.rossengineers.com Ross understands that assignments under this continuing services contract may vary considerably in size, complexity, urgency, and funding source. Our available services include roadway and drainage improvements; stormwater collection, wells, and pumping systems; water distribution and wastewater collection systems; pump stations; utility coordination and relocation; surveying and mapping; hydrologic and hydraulic analysis; feasibility studies; planning; permitting; cost estimating; preparation of plans, specifications, and construction documents; bidding assistance; construction administration; field observation; inspections; grant-related support; plan review; and miscellaneous civil engineering consultation. For each task order, Ross will begin by confirming the City’s scope, schedule, budget, available information, permitting requirements, utility conditions, public-access considerations, and operational constraints. Our team will document existing conditions, identify project risks early, evaluate practical alternatives, and maintain regular communication with the City throughout design and construction. Cost estimates and schedules will be monitored as the work progresses, and formal quality reviews will be conducted at appropriate milestones to minimize errors, reduce unnecessary redesign, and support timely permitting and construction. Ross’s proposed management structure provides the City with direct access to experienced leadership and clearly defined responsibility. Melissa Ross, MSCE, Principal-in-Charge, will provide executive oversight, resource allocation, and overall contract accountability. Robert Ross, PE, Project Manager, will serve as the City’s primary day-to-day point of contact and will manage task-order delivery, staffing, schedules, budgets, subconsultant coordination, and communication with City staff. Robert will coordinate SGM Engineering and Thomas J. Kelly, Inc. whenever their specialized services are required, ensuring that their work is incorporated into Ross’s project schedule and deliverables. Raymond Rammo, PE, Technical Advisor and QA/QC Lead, will provide senior-level technical guidance, independent quality review, permitting and constructability input, and final technical oversight. They will be supported by Ross’s engineering analysts, civil designers, engineers in training, CAD production staff, project documentation personnel, and field-support team. Ross’s multidisciplinary team also provides the City with specialized sustainability and commissioning expertise through SGM Engineering. SGM team member Bobby Shahnami, PE, CxA, LEED AP BD+C, brings commissioning and LEED-accredited expertise that can support energy-conscious and sustainable solutions when applicable to individual assignments. As a certified woman-owned and small business, Ross combines the responsiveness and accessibility of a focused South Florida firm with extensive municipal engineering experience, advanced hydrologic and hydraulic modeling capabilities, and a demonstrated record of delivering public infrastructure projects throughout Miami-Dade, Broward, and Palm Beach Counties. Our team is committed to protecting public safety, controlling costs, meeting schedules, minimizing disruption to residents and businesses, and developing infrastructure solutions that provide reliable long-term performance. Ross Engineering appreciates the opportunity to submit our qualifications and respectfully requests consideration for selection under Discipline 3 – General Civil Engineers. We look forward to continuing our relationship with the City of Sunny Isles Beach and serving as a dependable and responsive extension of City staff throughout the term of this continuing professional services contract. Sincerely, ROSS ENGINEERING, INC. Melissa Ross, MSCE | President / Principal-in-Charge 17670 NW 78th Avenue, Suite 214 Miami, Florida 33015 786-468-8304 | mross@rossengineers.com 5 1. Company Information 6 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 1. Company Information Ross Engineering is a Florida civil and environmental engineering consulting firm with offices in Miami-Dade and Broward Counties. The firm’s Miami-Dade County office will serve as the primary local office responsible for managing and supporting assignments issued by the City of Sunny Isles Beach. Outstanding Litigation Ross Engineering, Inc. has no outstanding litigation that would threaten the financial viability of the firm or its ability to successfully perform the services required under this contract. Criminal and Civil Litigation History Ross Engineering, Inc. has no criminal or civil litigation to report for the five-year period immediately preceding this Request for Qualifications. The firm has also reported no pending litigation, major disputes, contract defaults, claims against the firm, or construction claims between Ross Engineering and an owner. Accordingly, there are no litigants, filing dates, venues, judgments, or claim descriptions to disclose. Proof of Insurance Current proof of insurance is included immediately following this page. Ross Engineering, Inc. maintains insurance appropriate for its professional engineering operations and will provide contract-specific certificates, endorsements, and evidence of coverage as required by the City upon award and for individual task orders. Legal Company Name: Ross Engineering, Inc. Doing Business As: None Entity Business Structure: Florida S Corporation Date Founded: February 11, 2003 Internet Website: www.rossengineers.com Contact Email: rross@rossengineers.com 3325 S. University Dr., 954-318-0624 954-358-0190 Ste. 111, Davie, FL 33328 305-392-1019 Company Principal Office / Headquarters 17670 NW 78th Street 786-468-8304 Ste. 214, Miami, FL 33015 Designated Office for the City of Sunny Isles Beach Ross Engineering, Inc. Established: February 11, 2003 Civil Engineering – Land Development – Water Resources Engineering – H&H Modeling – Inspection Services 7 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer INSR ADDL SUBRLTRINSRWVD DATE (MM/DD/YYYY) PRODUCER CONTACTNAME:FAXPHONE(A/C, No):(A/C, No, Ext): E-MAILADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY)(MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE INSURER(S) AFFORDING COVERAGE NAIC # Y / N N / A (Mandatory in NH) ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? EACH OCCURRENCE $ DAMAGE TO RENTED $PREMISES (Ea occurrence)CLAIMS-MADE OCCUR MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ PRO- OTHER: LOCJECT COMBINED SINGLE LIMIT $(Ea accident) BODILY INJURY (Per person)$ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident)$AUTOS ONLY AUTOS AUTOS ONLYHIRED PROPERTY DAMAGE $AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE $ CLAIMS-MADE AGGREGATE $ DED RETENTION $$ PER OTH-STATUTE ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $If yes, describe under E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below POLICY NON-OWNED SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03) ACORDTM CERTIFICATE OF LIABILITY INSURANCE Travelers Indemnity Company of CT Travelers Property Cas. Co. of America Travelers Casualty and Surety Company SiriusPoint Specialty Insurance Corp St Paul Mercury Insurance Co 7/08/2026 USI Insurance Services, LLC 2502 N Rocky Point Drive Suite 400 Tampa, FL 33607 TeamAECertificate@usi.com Ross Engineering, Inc. 3325 S University Dr. UNIT 111 Davie, FL 33328 25682 25674 19038 16820 24791 A X X X X X X6601B452576TCT26 08/10/2026 08/10/2027 2,000,000 1,000,000 10,000 2,000,000 4,000,000 2,000,000 E X X X X X BAA09754742647G 08/10/2026 08/10/2027 1,000,000 B X X X 10000 X X CUP7S4222222647 08/10/2026 08/10/2027 2,000,000 2,000,000 C Y X UB8K2361942647G 08/10/2026 08/10/2027 X 1,000,000 1,000,000 1,000,000 D Professional Liability PROVAE000023901 02/26/2026 02/26/2027 $2,000,000 per claim $2,000,000 annl aggr. Professional Liability coverage is written on a claims-made basis. Ross Engineering, Inc. 3325 S. University Dr., Ste. 111 Davie, FL 33328 1 of 1#S54992374/M54991679 ROSSENGClient#: 1054822 PDNZP Proof of Insurance INSR ADDLSUBRLTRINSR WVD DATE (MM/DD/YYYY) PRODUCER CONTACTNAME:FAXPHONE(A/C, No):(A/C, No, Ext): E-MAILADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE INSURER(S) AFFORDING COVERAGE NAIC # Y / N N / A (Mandatory in NH) ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? EACH OCCURRENCE $ DAMAGE TO RENTED $PREMISES (Ea occurrence)CLAIMS-MADE OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ PRO- OTHER: LOCJECT COMBINED SINGLE LIMIT $(Ea accident) BODILY INJURY (Per person) $ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS AUTOS ONLYHIRED PROPERTY DAMAGE $AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE $ CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ PER OTH-STATUTE ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $If yes, describe under E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below POLICY NON-OWNED SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03) ACORDTM CERTIFICATE OF LIABILITY INSURANCE Travelers Indemnity Company of CT Travelers Property Cas. Co. of America Travelers Casualty and Surety Company SiriusPoint Specialty Insurance Corp St Paul Guardian Insurance Co USI Insurance Services, LLC 2502 N Rocky Point Drive Suite 400 Tampa, FL 33607 TeamAECertificate@usi.com Ross Engineering, Inc. 3325 S University Dr. UNIT 111 Davie, FL 33328 25682 25674 19038 16820 24775 AX X X X X X6601B452576TCT24 08/10/2024 08/10/2025 2,000,000 1,000,000 10,000 2,000,000 4,000,000 2,000,000 E X XX X X BAA09754742547G 06/03/2025 08/10/2025 1,000,000 B XX X 10000 XXCUP7S4222222447 08/10/2024 08/10/2025 2,000,000 2,000,000 C Y X UB8K2361942447G 08/10/2024 08/10/2025 X 1,000,000 1,000,000 1,000,000 D Professional Liability PROVAE000023900 02/26/2025 02/26/2026 $1,000,000 per claim $1,000,000 annl aggr. Professional Liability coverage is written on a claims-made basis. For Proposal Purposes 1 of 1#S49615210/M49609244 ROSSENGClient#: 1054822 SECZP 07/07/2025 8 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Established in 2003 by civil and water resources engineers Melissa Ross and Robert J. Ross, PE, LEED AP, Ross Engineering, Inc. is a civil, environmental, and water resources engineering firm with 15 full-time employees and offices in Miami-Dade and Broward Counties. The firm’s principals bring a combined 53 years of engineering experience, primarily within the State of Florida, and have successfully guided public- and private-sector projects from initial planning and evaluation through design, permitting, bidding, construction administration, inspection, and closeout. Ross Engineering takes a collaborative, team-oriented approach to project delivery, with careful consideration of project budgets, schedules, constructability, regulatory requirements, operations, and long-term maintenance. By using advanced engineering and computer-modeling technology, remaining current with evolving design standards and permitting criteria, and maintaining a strong team of South Florida engineering professionals, Ross has established a successful record in civil engineering, project management, municipal infrastructure, and water resources engineering. For more than two decades, Ross Engineering has performed work under continuing professional services and task work order contracts for municipalities, counties, public works departments, water and wastewater utilities, K–12 school districts, higher education institutions, parks and recreation departments, water management agencies, and private-sector clients throughout South Florida. Ross understands the responsiveness, flexibility, clear scope definition, schedule control, budget management, and consistent communication required to successfully support public agencies under continuing services contracts. ROSS ENGINEERING PROVIDES PROFESSIONAL SERVICES IN THE FOLLOWING PRINCIPAL AREAS: Civil and Municipal Engineering: Roadway, paving, grading, drainage, utility coordination, land development, public facilities, parks, sidewalks, ADA improvements, stormwater pollution prevention, construction documents, permitting, bidding assistance, construction administration, and inspection services. Water Resources and Stormwater Engineering: Hydrologic and hydraulic modeling, stormwater master planning, drainage system analysis and design, flood mitigation, water quality modeling, surface water and groundwater modeling, drainage wells, stormwater pump stations, control structures, canals, reservoirs, impoundments, levees, and environmental resource permitting. Our team has extensive experience navigating permitting requirements and coordinating approvals with the Miami-Dade County Department of Environmental Resources Management (DERM) and the U.S. Army Corps of Engineers (USACE), supporting efficient project delivery while maintaining compliance with applicable environmental regulations. Water and Wastewater Utility Engineering: Water distribution systems, sanitary sewer collection systems, force mains, lift stations, pump stations, roadway utility crossings, utility extensions and relocations, fire flow improvements, septic systems, irrigation systems, wells, and associated permitting. Our team has experience coordinating water and wastewater utility projects with the Florida Department of Environmental Protection (FDEP), including permitting and regulatory compliance related to drinking water, wastewater collection and treatment, and associated environmental requirements. Transportation and Traffic Engineering: Roadway reconstruction and rehabilitation, turn lanes, driveways, sidewalks, medians, signing and pavement markings, maintenance of traffic, utility relocations, drainage connections, and right-of-way permitting. Our team has experience coordinating with regulatory agencies and stakeholders, including the Miami-Dade County Traffic Engineering Division, Miami-Dade County Highway Construction and Engineering Division, and the Florida Department of Transportation (FDOT), to support compliant, constructible, and efficiently delivered transportation improvements. Inspection and Construction-Phase Services: Construction administration, field observation, civil construction inspection, shop drawing review, request-for-information responses, change order review, punch-list preparation, project closeout, five-year drainage recertification inspections, and NPDES stormwater inspections. This range of services directly supports the City of Sunny Isles Beach’s anticipated needs for roadway and drainage improvements, stormwater wells and pumps, water distribution and wastewater collection systems, utility coordination, permitting, construction administration, inspections, and related municipal engineering assignments. History and Services Ross Engineering, Inc. Civil Engineering – Land Development – Water Resources Engineering H&H Modeling – Inspection Services 9 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Hydrologic and Hydraulic Modeling • Groundwater Modeling (Modflow, GMS, and 3D Modflow) • Integrated Surface / Groundwater Modeling (Mike-She /Mike 11, XP-SWMM, EFOC/HEM 3D) • Surface Water Modeling (XP-SWMM, ICPR, Mike 11, SMS, HEC HMS/HEC-RAS) • Stormwater Master Planning (XP-SWMM) • Water Quality / Ecological Modeling (WAM, WASP, SWMM) • 2D and 3D Modeling (XP-SWMM, HEC, Flow 3D) Civil Engineering • Drainage Design and Permitting • Traffic Design and FDOT and / or County Permitting • Land Development for Residential, Commercial, Industrial, Educational and Agricultural Uses • Retrofits to Existing Properties • Utility Design and Permitting • Public Works Design (Roadway, Drainage, Utilities, Traffic, etc.) • Environmental Resource Permitting (Stormwater, Wetlands, Endangered Species, etc.) • Stormwater Pollution Prevention Plans Inspections • Construction Inspection Admin Services • 5 Year Operation and Maintenance Drainage Recertification • NPDES Stormwater Inspections / Permitting Water Use Permitting • Irrigation Design and Permitting • Well Design and Permitting Utility Engineering • Sanitary Lift Station and Stormwater Pump Station Design and Permitting • Septic Design and HRS Permitting • Water Distribution System Design and Permitting • Utility Crossing and Utility Extension Design and Permitting Water Resources Engineering • Canal Design & Permitting • Reservoir / Impoundment Design & Permitting • STA Design & Permitting • Control Structure Design & Permitting • Levee Design; Seepage Analysis & Permitting Expert Witness • Drainage / Stormwater • Utilities • Transportation • Environmental Transportation and Traffic Engineering • RRR Projects • Reconstruction Projects • Interchange Projects • Bridge and Culvert Scour Projects • Design-Build Projects • Turn Lane, Driveway, Sidewalk, and Median Projects • Utility Extension, Relocation and Canal Crossing Projects • Drainage Connection, Driveway Connection, Utility and ROW Permitting Projects 10 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Legal Company Name: SGM Engineering, Inc. Doing Business As: N/A Entity Business Structure: Florida S Corporation Date Founded: December 17, 1991 Website: https://www.sgmengineering.com/ Office Location: 5301 Waterford District Drive, Ste. 750 Miami, FL 33126 Ph: 954.421.1944 | F: 954.421.1924 Founded in 1991, SGM Engineering, Inc. is a minori- ty-owned Florida consulting firm providing com- prehensive mechanical, electrical, plumbing, fire protection, commissioning, energy, low-voltage, and construction administration services. With 63 professionals and five offices throughout Florida, including Miami, SGM combines the resources of a statewide firm with the local responsiveness and South Florida experience needed to support the City of Sunny Isles Beach. SGM has extensive ex- perience delivering building-system assessments, renovations, replacements, and infrastructure im- provements for municipalities and other public-sec- tor clients under continuing-services contracts. As a member of the Prime Consultant’s team, SGM will provide mechanical, HVAC, and plumbing engineer- ing for City facilities, including existing-system eval- uations; HVAC equipment, controls, and ventilation improvements; plumbing infrastructure upgrades; energy-efficiency measures; cost estimating; con- struction documents; permitting assistance; bid support; and construction administration. When included in a task order, SGM can also provide com- missioning support, controls verification, function- al performance testing, and testing-and-balancing review. SGM understands the challenges affecting facilities in a coastal community, including high humidity, salt-air corrosion, storm resilience, aging infrastructure, equipment protection, energy con- sumption, maintainability, and the need to com- plete improvements without interrupting essential public services. Our engineers work collaboratively with the Prime Consultant and all project disciplines to deliver coordinated, constructible, permit-ready solutions. SGM’s team includes licensed Profession- al Engineers and professionals holding CxA, LEED AP, RCDD, and CPD credentials, supported by a dis- ciplined QA/QC program and experience on more than 120 LEED-certified projects. Mechanical, HVAC, & Plumbing Engineering Land Surveying & Mapping Legal Company Name: Thomas J. Kelly, Inc. Doing Business As: N/A Entity Business Structure: Florida S Corporation Date Founded: April 19, 1971 Website: https://tjklandsurveying.com/ Office Location: 9445 SW 100th St. Miami, FL 33176 Ph: 786.242.7692 Thomas J. Kelly, Inc. has been providing profession- al land surveying services throughout South Florida since the 1940s. Founded by Thomas J. Kelly, P.E., P.L.S., a longtime Coral Gables resident, the firm established a reputation for accuracy, profession- alism, and dependable service during a period of significant growth and development throughout Miami-Dade County. Over the decades, the firm has contributed to numerous surveying projects, including work associated with some of the earli- er recorded plats in Miami-Dade County. Near the end of his distinguished career, Mr. Kelly entrusted the firm to Jose and Lillian Perea. Since then, Thom- as J. Kelly, Inc. has remained under the ownership and management of the Perea family for more than 35 years, preserving the firm’s longstanding com- mitment to professional integrity, technical excel- lence, and responsive client service. Today, Thomas J. Kelly, Inc. combines more than eight decades of surveying heritage with modern technology and proven field practices to deliver reliable surveying services throughout South Florida. The firm utilizes Autodesk Civil 3D, GNSS equipment, total stations, digital levels, and least-squares adjustment soft- ware to support a wide range of surveying projects. Throughout its history, Thomas J. Kelly, Inc. has pro- vided surveying services for notable projects in- cluding St. Theresa School and Church, Christopher Columbus High School, and numerous residential, commercial, institutional, and construction projects throughout South Florida. Thomas J Kelly provides the following core services: • Boundary Surveys • Topographic Surveys • ALTA/NSPS Land Title Surveys • Construction Layout & Stakeout • Existing Conditions Surveys • As-Built Surveys • Elevation Certificates • Legal Descriptions & Sketches • Easement Exhibits • Control Surveys 11 2. Qualifications 12 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer MINIMUM QUALIFICATION REQUIREMENT #1: LICENSING REQUIREMENTS ROSS ENGINEERING, INC. State of Florida Department of State I certify from the records of this office that ROSS ENGINEERING INC.is a corporation organized under the laws of the State of Florida,filed on February 10,2003,effective February 11,2003. The document number of this corporation is P03000018456. I further certify that said corporation has paid all fees due this office through December 31,2026,that its most recent annual report/uniform business report was filed on January 20,2026,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Twentieth day of January, 2026 Tracking Number:8036019234CC To authenticate this certificate,visit the following site,enter this number,and thenfollowtheinstructionsdisplayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication Office of Supplier Development 4050 Esplanade Way, Suite 380 Tallahassee, Florida 32399 850-487-0915 www.dms.myflorida.com/osd Florida Department of Management Services Pedro Allende Woman Business Certification Ross Engineering, Inc 10/27/2025 10/27/2027 LBT Local Business Tax Receipt Miami−Dade County Office of The TaxCollector -THIS IS NOT A BILL - DO NOT PAY BUSINESS NAME/LOCATION RECEIPT NO. EXPIRES Must be displayed at place of business Pursuant to County Code PAYMENT RECEIVED BY TAX COLLECTOR Chapter 8A - Art. 9 & 10 OWNER SEC. TYPE OF BUSINESS This Local Business Tax Receipt only confirms payment of the Local Business Tax. The Receipt is not a license, permit, or a certification of the holder’s qualifications, to do business. Holder must comply with any governmental or nongovernmental regulatory laws and requirements which apply to the business. The RECEIPT NO. above must be displayed on all commercial vehicles − Miami−Dade Code Sec 8a−276. For more information, visit mdctaxcollector.gov 6409379 ROSS ROBERT 212 PE59485 SEPTEMBER 30, 2026ROSS ROBERT 17670 NW 78TH AVE STE 214 HIALEAH, FL 33015-3670 6677505 PROFESSIONAL PTBTC-25-149741 RENEWAL 100.00 09/03/2025 LBT Local Business Tax Receipt Miami−Dade County Office of The TaxCollector -THIS IS NOT A BILL - DO NOT PAY BUSINESS NAME/LOCATION RECEIPT NO. EXPIRES Must be displayed at place of business Pursuant to County Code PAYMENT RECEIVED BY TAX COLLECTOR Chapter 8A - Art. 9 & 10 OWNER SEC. TYPE OF BUSINESS This Local Business Tax Receipt only confirms payment of the Local Business Tax. The Receipt is not a license, permit, or a certification of the holder’s qualifications, to do business. Holder must comply with any governmental or nongovernmental regulatory laws and requirements which apply to the business. The RECEIPT NO. above must be displayed on all commercial vehicles − Miami−Dade Code Sec 8a−276. For more information, visit mdctaxcollector.gov 6409361 ROSS ENGINEERING INC 212 SEPTEMBER 30, 2026ROSS ENGINEERING INC 17670 NW 78TH AVE STE 214 HIALEAH, FL 33015-3670 Employee(s) 6677497 P.A./CORP/PARTNERSHI P/FIRM PTBTC-25-149741 RENEWAL 75.00 7 09/03/2025 • Firm Corp Certificate • Firm and Proposed Team Member Licenses MQR # 1 13 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Melanie S. Griffin, SecretaryRon DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES RAMMO, RAYMOND A. Do not alter this document in any form. 120 SW 91 AVENUE LICENSE NUMBER: PE49644 EXPIRATION DATE: FEBRUARY 28, 2027 This is your license. It is unlawful for anyone other than the licensee to use this document. APT. 107 PLANTATION FL 33324 Always verify licenses online at MyFloridaLicense.com DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION (Continued) MINIMUM QUALIFICATION REQUIREMENT #1: LICENSING REQUIREMENTS ROSS ENGINEERING, INC. Melanie S. Griffin, SecretaryRon DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ROSS, ROBERT J. Do not alter this document in any form. 3325 S. UNIVERSITY DRIVE, SUITE 111 LICENSE NUMBER: PE59485 EXPIRATION DATE: FEBRUARY 28, 2027 This is your license. It is unlawful for anyone other than the licensee to use this document. DAVIE FL 33328 Always verify licenses online at MyFloridaLicense.com DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION MQR # 1 14 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer MINIMUM QUALIFICATION REQUIREMENT #1: LICENSING REQUIREMENTS SGM ENGINEERING, INC. • Firm Corp Certificate • Firm and Proposed Team Member Licenses Melanie S. Griffin, SecretaryRon DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES SHAHNAMI, BOBAK Do not alter this document in any form. 9325 SW 144ST LICENSE NUMBER: PE78419 EXPIRATION DATE: FEBRUARY 28, 2027 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33176 Always verify licenses online at MyFloridaLicense.com DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION Office of Supplier Development4050 Esplanade Way, Suite 380 Tallahassee, Florida 32399 850-487-0915 www.dms.myflorida.com/osd Florida Department of Management Services Pedro Allende Minority Business Certification SGM Engineering, Inc. 01/07/2025 01/07/2027 10666827-AP-BD+C CREDENTIAL ID 27 JUL 2012 ISSUED 25 AUG 2026 VALID THROUGH GREEN BUSINESS CERTIFICATION INC. CERTIFIES THAT Bobby Shahnami HAS ATTAINED THE DESIGNATION OF LEED AP® Building Design + Construction by demonstrating the knowledge and understanding of green building practices and principles needed to support the use of the LEED ® green building program. PETER TEMPLETON PRESIDENT & CEO U.S. GREEN BUILDING COUNCIL & GREEN BUSINESS CERTIFICATION INC. Bobby Shahnami, CxA SGM Engineering, Inc. 611-850 1/1/2026 12/31/2026 State of Florida Department of State I certify from the records of this office that SGM ENGINEERING,INC.is a corporation organized under the laws of the State of Florida,filed on December 20,1991,effective December 17,1991. The document number of this corporation is V02240. I further certify that said corporation has paid all fees due this office through December 31,2026,that its most recent annual report/uniform business report was filed on January 5,2026,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Fifth day of January,2026 Tracking Number:3004624035CC To authenticate this certificate,visit the following site,enter this number,and thenfollowtheinstructionsdisplayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication Melanie S. Griffin, SecretaryRon DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ZAREH MESHREKY, HANY ZAKI Do not alter this document in any form. 13440 FLACON POINTE DR LICENSE NUMBER: PE88541 EXPIRATION DATE: FEBRUARY 28, 2027 This is your license. It is unlawful for anyone other than the licensee to use this document. ORLANDO FL 32837 Always verify licenses online at MyFloridaLicense.com DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION Melanie S. Griffin, SecretaryRon DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES STELLPFLUG, JOHN ANDREW Do not alter this document in any form. 3495 CINDY CIRCLE LICENSE NUMBER: PE68794 EXPIRATION DATE: FEBRUARY 28, 2027 This is your license. It is unlawful for anyone other than the licensee to use this document. TITUSVILLE FL 32796 Always verify licenses online at MyFloridaLicense.com DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION MQR # 1 15 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer MINIMUM QUALIFICATION REQUIREMENT #1: LICENSING REQUIREMENTS THOMAS J. KELLY, INC. • Firm Corp Certificate (Sunbiz) • Firm and Proposed Team Member Licenses MQR # 1 16 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Project Description Under the City of North Miami Continuing Engineering Contract, Ross has provided a range of civil engineering services including water main improvements, roadway and stormwater improvements, hydrologic and hydraulic analysis, stormwater pump station evaluation, utility coordination, permitting, construction support, and related municipal infrastructure services. Representative Task Order – Biscayne Park Water Main Extension: Robert J. Ross, PE, LEED AP, served as Engineer of Record for the extension of the existing 6-inch water main along NE 9th Avenue. Ross coordinated with the City’s Public Works Director to confirm the project scope, design requirements, and implementation approach. The project included approximately 1,000 linear feet of new 6-inch PVC water main and two new fire hydrants, connecting to the existing 6-inch main along NE 10th Avenue. Plans and profiles identified roadway and swale conflicts and supported permitting through the City of North Miami, Miami- Dade County Health Department, and Miami-Dade Fire Department. Ross also provided construction inspection support and obtained final certification through the Health Department. There were no project delays; the project started on time and was completed with no amendments, change orders, or work stoppages CITY OF NORTH MIAMI CONTINUING ENGINEERING CONTRACT Utility Relocations for FDOT Projects: No. 427521-2-52-01 (SR-922); 439976-1-52-01 (SR-909) City of North Miami, FL Client Reference Augustin Fleur-Aime; Project Manager City of North Miami 1815 NE 150th Street, North Miami, FL 33181 305-893-6511, ext. 15001 afleur-Aime@ northmiamifl.gov Role Prime Consultant Performance Period 2022 - 2027 Total Amount of Contract $70,000 Services similar to Sunny Isles • Various water main improvements and roadway and stormwater improvements; including: hydrologic and hydraulic analysis; • stormwater pump station evaluation; • pump and system curves; • runoff analysis; flood mitigation, and infrastructure recommendations • City of North Miami Engineering Design Services Biscayne Park Water Main Extension – Robert J. Ross, PE, LEED AP was the Engineer of Record for the water main extension task work order to extend the existing 6” water main along NE 9th Ave. The project included coordination with the Public Works Director Mr. Wisler Pierre-Louis to discuss the scope of work and Ross’s role on the project. Approximately 1,000 linear feet of 6” PVC water main extension and two new fire hydrants were designed along NE 9th Ave and connected into the existing 6” on NE 10th Ave. Plans and profiles were designed for the water main extension showing all of the conflicts in the roadway and swale areas. Permits were obtained for this project through City of North Miami, Miami Dade County Health Department, and Miami Dade Fire Department. The construction was inspected, and certification was obtained through the Health Department. There were no project delays – the project started on time and was completed with no amendments, charge orders and the project was not stopped for any reason. Miami-Dade County Parks & Recreation Dept. - Biscayne Park Watermain ExtensionCity of North Miami, FL ReferenceCity of North MiamiWisler Pierre-Louis, P.E., LEED AP – Public Works Director pwisler@northmiamifl.gov 305-895-9833 Contract Amount # Key Project Features Civil Engineering Water Resources Engineering Completion Engineering Services: Start: 2013 Completed: 2014 MQR #2 Project # 1 17 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Watermain Replacement along Alhambra Circle (PCTS 15379) As part of the Continuing Services Contract E15-WASD-03A, Ross was hired for the design of this new emergency watermain along Alhambra Circle. The design included engineering design and project management services, specifications construction inspections and MOT plans. The scope included designing 1,800 linear feet of new 8” dip watermain to replace the existing 3” shallow pipeline in that area. The watermain had to be offset from the median due to the large trees’ roots destroying the pipe. Dry run permits were approved from the City of Coral Gables which included a complex, advanced Maintenance of Traffic plan that the City’s Public Works department requested. Construction has recently been completed and certified. Completed: June 2023 Cost: $411K NW 22nd Ave Wastewater Collection/Transmission System Expansion and Water Distribution Systems Improvement for the North Sub-Basin (D2-C-1) (PCTS 15158) For project PCTS 15158 along NW 22nd Ave and NW 95th St, Ross designed the D2-C-1 north portion servicing the area from NW 90th St north towards NW 95th street, then east from NW 22nd Ave to NW 17th Ave. The scope of work included the design, permitting and Construction Inspection of the wastewater collection and transmission system and improvements along the North Basin, north of NW 22nd Avenue. The design included design a new potable water and wastewater distribution system to the commercial and industrial parcels. The plan and profiles of the wastewater system in civil 3D based on design report provided by MDWASD. This design included 11,500 linear feet of new 8” and 12” sewer main, 850 linear feet of force main, and 5,800 linear feet of 8”, 10” and 12” watermain along NW 22nd Ave. Pavement Restoration and MOT plans were provided on the plans for permitting. Client Reference Daniel Lizarazo, PE, ENV SP AMI Program Director Miami-Dade Water and Sewer Department 3575 South LeJeune Road, Miami, FL 33146 Office: 786-552-4400 Cell: 305-205-0902 Daniel.Lizarazo@ miamidade.gov Role Prime Consultant Performance Period 2018–Ongoing Total Amount of Contract Various Task Orders Under This Contract Showcased Projects: PCTS 15379 - $411K PCTS 15158 - $9M PCTS 16310 - $102,841 MIAMI-DADE WATER AND SEWER DEPARTMENT Small Diameter/Small Water Main Replacement Program PCTS 15739, 15158, 16310, 16076, 15752, 16171, 16163, 16331, 20002, 2018 Miami-Dade County, FL MQR #2 Project # 2 18 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer PAGE 2 Miami-Dade Water and Sewer Department: Small Diameter/Small Water Main Replacement Program PCTS 15739, 16310, 15158, 16076, 15752, 16171, 16163, 16331, 20002, 2018 Miami-Dade County, FL All the residents in that area will be required to abandon their existing septic systems and connect to the new sewer lateral that will be designed for each house. Through this new project, each property will be provided with a new 6” sanitary sewer lateral, new water meter and water service that is connected to the new mains in the street. Design Completed: 10/2024 Cost: $9M Connect to Protect – Atlas S14 (PCTS 16310) Connect to Protect Project for Atlas S14 in the City of Sweetwater was one of the project Ross worked on under the continuing contract. The purpose of this very important project endorsed by the Mayor of Miami Dade County is to extend sanitary sewer service to residents with septic systems in order to protect properties, health, and natural areas such as Biscayne Bay. The septic systems that were considered by MD-WASD to be vulnerable or may fail by 2040 were the priority for this analysis. Ross provided an engineering evaluation and technical memorandum for the Connect to Protect (i.e., Septic to Sewer) program for 1-square mile of Atlas S14. The technical memorandum was an assessment of the existing sewer assets in the right-of-way and the possibility for providing lateral connections from the existing gravity sewer to the property boundary. This analysis was for all vulnerable parcels in the atlas which currently use septic systems, and which abut existing gravity sewers. A thorough investigation of this area was completed via GIS database and as-builts provided by MD-WASD and City of Sweetwater. Out of the 102 parcels analyzed in Atlas S14, only 81 lateral connections were possible based on the criteria. These 81 possible connections are based on adjacent sewer laterals, however water main offsets may be required where the laterals cross over large water mains. Completed: April 2026 Fee: Cost: $102,841 Services similar to Sunny Isles • Continuing Water & Wastewater Engineering • Emergency Water Main Replacement • Water Main Design & Upsizing • Gravity Sewer & Force Main Design • Wastewater Collection/ Transmission Improvements • Septic-to-Sewer Conversion • Water Services, Meters & Sewer Laterals • GIS & As-Built Infrastructure Analysis • Utility Conflict/Offset Evaluation • Technical Memoranda & Engineering Assessments • Civil 3D Plan & Profile Development • Maintenance of Traffic Plans • Pavement Restoration Design • Permitting & Agency Coordination • Construction Documents & Specifications • Construction Inspection • Project Management • Construction Certification 19 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Project Description Our Continuing Contract with the School Board started in 2018 under RFQ #17-114C, Ross was assigned a 5-year drainage recertification task work order which includes drainage analysis and drainage design on sites where flooding is an issue. Ross was recently re-selected for this contract in 2023 to continue consulting on the School Board’s drainage infrastructure through 2028. Since 2018, Ross has successfully inspected and certified over 45 schools in Broward County. The schools’ range in size from over 50 acres with 112 drainage structures to 15 acres with 30 structures. Each site was broken down into the following process: Typical 5 year drainage certification process: • Schedule inspection at school • Perform inspection at school • Prepare inspection report • QA/QC Review • Opinion of probable cost • Coordinate with SBBC & contractor to request cost estimate • Review cost estimate from cost estimate and request PO • Perform follow-up inspection post contractor maintenance, 1st • Prepare follow-up report • Perform follow-up inspection post contractor maintenance, 2nd • Prepare Renewal Letter including check request • Follow-up with County and notify SBBC of completed SWM renewal Some school sites have existing flooding issues and a new mandate by the school board commission board has been implemented to upgrade existing school properties to eliminate flooding and protect buildings and facilities onsite. Ross has utilized both ICPR 4.0 and SFWMD CASCADE modeling software to perform drainage studies on several school sites. From the studies, concept designs are submitted to the School Board PM for review and in most cases final design and permitting is initiated and commenced. Solutions include gravity drainage wells, exfiltration trenches, retention areas, wet ponds, swales etc. Below are a sample of schools that were certified or in the process of the 5-year certification with Broward County, South Broward Drainage District, Indian Trace Improvement District, Sunshine Water control District and Cocomar Water Control District. • Bayview Elementary School – Fort Lauderdale (Broward County) • Blanche Ely High School – Pompano Beach FL (Broward County) • Coral Glades High School – Coral Springs FL (Sunshine Water Control District) • Falcon Cove Middle School – Weston FL (Indian Trace improvement District) BROWARD COUNTY PUBLIC SCHOOLS CIVIL ENGINEERING CONTINUING SERVICES Broward County, FL Client Reference Teresa A. Thomas, CIEC, FLMA Coordinator, Environmental Compliance Broward County Public Schools 4200 NW 10th Avenue, Oakland Park, FL 33309 Office: 754-321-4200 Cell: 954-205-7105 t.thomas@ browardschools.com Role Prime Consultant Performance Period Civil Engineering Continuing Services Contract 2023-2028; Ross has provided related services to the School Board since 2018 Total Amount of Contract $5 million over 5 years MQR #2 Project # 3 20 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer PAGE 2 Broward County Public Schools Civil Engineering Continuing Services Broward County, FL • Gator Run Elementary School – Weston FL (Indian Trace improvement District) • Manatee Bay Elementary School – Weston FL (Indian Trace improvement District) • Margate Middle School – Margate FL (Cocomar/Broward County) • Monarch High School - Coconut Creek FL (Cocomar/Broward County) • New River Middle School – Fort Lauderdale FL (Broward County) • Northeast High School – Oakland Park FL (Broward County) • Pines Middle School – Pembroke Pines FL (South Broward Drainage District) • Piper High School – Sunrise, FL (Broward County) • Sawgrass Elementary School – Sunrise, FL (Broward County) • Sunset School (Sheridan Technical School) - Fort Lauderdale FL (Broward County) • Water C Young Middle School – Pembroke Pines FL (South Broward Drainage District) • West Broward High School – Pembroke Pines FL (South Broward Drainage District) • William Dandy Middle School – Fort Lauderdale FL (Broward County) The certifications for these schools were promptly submitted and successfully certified, all while remaining within the task work order budget negotiated for each school. The firm accomplished this feat by meticulously adhering to a proactive approach of meeting with all stakeholders including School Board project management, school principals and maintenance staff, School Board building dept officials and county and local drainage district staff. This approach ensured that time and budgetary constraints were met with precision. •Piper High School – Sunrise, FL (Broward County) •Sawgrass Elementary School – Sunrise, FL (Broward County) •Sunset School (Sheridan Technical School) - Fort Lauderdale FL (Broward County) •Water C Young Middle School – Pembroke Pines FL (South Broward Drainage District) •West Broward High School – Pembroke Pines FL (South Broward Drainage District) •William Dandy Middle School – Fort Lauderdale FL (Broward County) The certifications for these schools were promptly submitted and successfully certified, all while remaining within the task work order budget negotiated for each school. The firm accomplished this feat by meticulously adhering to a proactive approach of meeting with all stakeholders including School Board project management, school principals and maintenance staff, School Board building dept officials and county and local drainage district staff. This approach ensured that time and budgetary constraints were met with precision. Services similar to Sunny Isles • Continuing Civil Engineering Services • Stormwater & Drainage Infrastructure Assessments • Five-Year Drainage Recertifications • Drainage Inspections & Certifications • Hydrologic/Hydraulic Studies • ICPR 4.0 & SFWMD CASCADE Modeling • Flooding Evaluations & Mitigation Design • Conceptual & Final Drainage Design • Gravity Wells, Exfiltration Trenches, Swales, Retention Areas & Wet Ponds • Drainage Permitting & Regulatory Coordination • Basis of Design / Drainage Reports • Opinions of Probable Construction Cost • Contractor Coordination & Cost Estimate Review • Construction/ Post-Maintenance Inspections • QA/QC & Project Closeout 21 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Project Description Atlas R26 (PCTS 16297) Base of Design Technical Memorandum As part of Ross Engineering’s contract with Miami-Dade Water and Sewer Department (MDWASD), Ms. Ross provided a technical memorandum to evaluate 1-square mile within the R26 atlas area to identify undersized water mains via GIS software and recommend improvements to the potable water distribution system for the mains less than 8-inches to meet current codes and design standards. Ms. Ross was the Project Manager for this task. GIS was utilized to identify the pipe characteristics such as aging pipelines, extensive leaks/repairs, undersized pipes, and relocation of existing mains with limited access in alleys or easements. Any existing mains less than 6 inches in residential areas were recommended to be upsized to 8 inches, 12-inch diameters for commercial, industrial, and high-density residential use and half-section lines, and 16 inches for the mains along full-section line roads. A fire flow analysis was also performed to ensure accurate sizing and fire hydrant spacing. Currently, Ms. Ross and staff are working on the next phase of this project to design the upsized water mains identified in the memo. Atlas R26 (PCTS 16297) Design Project Following the BODR, Miami-Dade approved the design for the water main replacement for one-half of the square mile that was evaluated. Ms. Ross is the Project Manager to design over 45,000 linear feet of water main in Atlas R26. This project is currently in the 30% design phase and is utilizing the proposed water main layout identified in the memorandum. The new design has been coordinated with Miami-Dade Water and Sewer’s modeling department. All 6-inch mains are abandoned in place and replaced with a new 8-inch DIP wm in the residential areas. In commercial, industrial, and high-density residential areas, the mains are proposed to be replaced with 12-inch water mains. All water meters in easements in the back of the property will be relocated to the front and connected to the new mains, and any section line roads are upsized to 16-inch wm. The undersized mains will also be upsized due to the fire flow deficiency on certain streets to bring them up to code. Existing fire hydrants will be reconnected to the new mains, and new hydrants will be added based on spacing requirements and approved by the Miami-Dade County Fire Department. In addition, the design also includes looping the mains where possible, including blow-off valves or adding additional fire hydrants at the 13 dead-end connections. MIAMI-DADE COUNTY WATER AND SEWER DEPARTMENT Small Diameter Contract - Small Water Main Replacement Program (R-26) Miami-Dade County, FL Client Reference Rudy Ibarra, PE Project Manager Miami-Dade County Water and Sewer Department 3575 South LeJeune Road, Miami, FL 33146 Office: 786.552.4400 | Cell: 305.281.8746 Rudy.Ibarra@miamidade.gov Role Prime Consultant Performance Period 2024 - Ongoing Total Amount of Contract$1.85M Services similar to Sunny Isles • Continuing Utility Engineering Services • GIS-Based Water System Analysis • Basis of Design Technical Memoranda • Existing Infrastructure & Capacity Evaluation • Fire-Flow Analysis • Water Main Replacement & Upsizing • 45,000+ LF of Water Main Design • Meter Relocations • Fire Hydrant Evaluation & Design • Water Main Looping & Dead-End Improvements • Blow-Off Valve Design • Utility Easement & Access Evaluation • Regulatory & Agency Coordination • Permitting • Construction Documents • Cost Estimating MQR #2 Project # 4 22 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer MQR # 3 MINIMUM QUALIFICATION REQUIREMENT #3: REFERENCESFULL PAGE REFERENCE LETTERS ARE UNDER TAB 5: REFERENCES 1. City of North Miami 2. Miami-Dade Water and Sewer Department (PCTS) 3. School Board of Broward County 4. Miami-Dade Water and Sewer Department (R-26) RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Phone: ____________________________________________ Email: ___________________________________________ 1.Q: Rate the firm’s success in providing their services as it relates to the project. A: 2.Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: 3.Q: Would you use them again? A: 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: 5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: 6.Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ ZŽƐƐŶŐŝŶĞĞƌŝŶŐ͕/ŶĐ͘ DŝĂŵŝͲĂĚĞtĂƚĞƌĂŶĚ^ĞǁĞƌĞƉĂƌƚŵĞŶƚ KĨĨŝĐĞ͗ϳϴϲ͘ϱϱϮ͘ϰϰϬϬ͖Ğůů͗ϯϬϱ͘ϮϬϱ͘ϬϵϬϮ ĚĂŶŝĞů͘ůŝnjĂƌĂnjŽΛŵŝĂŵŝĚĂĚĞ͘ŐŽǀ ĂŶŝĞů>ŝnjĂƌĂnjŽ͕W͕Es^W Excellent. Ross has successfully delivered design and engineer-of-record services on the Department's Small Diameter Water Main Replacement Program (PCTS 15739, 15158, 16076, 15752, 16171, 16163, 16310, 16331, 20002, and 20183), and their work has consistently met the Department's requirements. Very competent and highly accessible. Ross has supported the Department on a wide range of projects over many years, and their staff have consistently been responsive, technically strong, and easy to work with through design and construction. Yes, without reservation. Yes. Ross devoted the time and personnel needed to complete each of these projects. Four of them alone accounted for well over 50,000 linear feet of water main design, and they have delivered many more for the Department over the years with the same level of commitment. Excellent. Their deliverables were consistently on time and complete, meeting the reporting dates and contentrequired under the agreement. Ross has been a reliable partner to the Department for a long time. Their deliverables have consistently been of good quality, and they are proactive in identifying and resolving issues before they affect the project. AMI Program Director REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) Ross Engineering, Inc. Firm giving Reference: _Broward County Public Schools Phone: _O ffice: 754-321-4200; Cell: 954-205-7105 Email: _tthomas@browardschools.com 1. Q: Rate the firm’s success in providing their services as it relates to the project. A: Excellent 2. Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: Excellent 3. Q: Would you use them again? A:yes 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: Excellent yes 5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: Excellent 6. Q: Is there anything else we should know, that we have not asked? A:no The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: Teresa A. Thomas, CIEC Title Coordinator Environmental Compliance Sign Name: Date: 7/23/2026 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Phone: ____________________________________________ Email: ___________________________________________ 1.Q: Rate the firm’s success in providing their services as it relates to the project. A: 2.Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: 3.Q: Would you use them again? A: 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: 5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: 6.Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ Ross Engineering, Inc. Miami-Dade Water and Sewer Department Office: 786.552.4400; Cell: 305.281.8746 rudy.ibarra@miamidade.gov Rudy Ibarra, PE 23 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 2. Qualifications 2.1 Why Ross Engineering Is Best Qualified Ross Engineering, Inc. is exceptionally qualified to provide continuing General Civil Engineering services to the City of Sunny Isles Beach because our firm combines more than two decades of South Florida civil and water resources engineering experience, direct prior experience with the City, a responsive Miami-Dade County office, experienced professional leadership, and demonstrated success delivering municipal projects under continuing-services and task work order contracts. Established in 2003, Ross Engineering provides civil engineering, roadway and drainage design, hydrologic and hydraulic modeling, water and wastewater utility engineering, stormwater pump and drainage well improvements, permitting, bidding assistance, construction administration, inspection, and project closeout services. Ross has supported municipalities, counties, public works departments, utility agencies, educational institutions, parks and recreation departments, and other public-sector clients throughout Miami-Dade, Broward, and Palm Beach Counties. Ross’ most significant advantage is our direct experience working for the City of Sunny Isles Beach. Under the City’s NE 172nd Street Roadway and Drainage Improvements project, Ross performed topographic and route surveying, ICPR 4.0 drainage analysis, roadway and grading design, evaluation of gravity drainage wells and exfiltration systems, pump improvements, utility coordination, permitting, signed and sealed construction documents, construction administration, field observations, as-built review, punch-list preparation, and closeout assistance. This experience gives Ross firsthand familiarity with the City’s coastal drainage conditions, constrained rights-of- way, existing infrastructure, permitting environment, review procedures, and expectations for project delivery. Ross understands that assignments under this contract may range from focused assessments and technical memoranda to full design, permitting, bidding, construction administration, and closeout. The City’s General Civil Engineering scope includes roadway and drainage improvements, conversion of stormwater wells to pressurized systems through the addition of pumps, water distribution, wastewater collection, pump stations, well injection systems, pipelines, structural components, cost estimating, permitting, bidding assistance, inspections, plan review, surveying, mapping, GIS, grant support, and representation of the City before regulatory agencies. Ross will serve as the prime consultant and self-perform the core civil and water resources engineering services. Our team will be supported by qualified subconsultants: • SGM Engineering, Inc. (SGM) for Mechanical, HVAC, & Plumbing Engineering • Thomas J. Kelly, Inc. for Surveying and Mapping This approach allows Ross to provide coordinated multidisciplinary services through a single point of responsibility. Our qualifications are further strengthened by: • A fully staffed Miami-Dade County office capable of responding quickly to City meetings, site visits, field conditions, and urgent assignments. • Extensive experience with continuing-services and task work order contracts. • Experienced leadership with direct principal involvement from project initiation through closeout. • Advanced capabilities in ICPR, SWMM, HEC-RAS, HEC-HMS, GIS, Civil 3D, and related civil and water resources applications. • A Florida-licensed professional engineering team and a LEED Accredited Professional. Certified woman-owned and small-business status. • A demonstrated record of delivering practical, constructible, permittable, maintainable, and cost- conscious solutions. REGULATORY AGENCY EXPERIENCE Ross has extensive experience coordinating with Miami-Dade County DERM/RER, Miami-Dade Water and Sewer Department, FDOT, FDEP, water management districts, local drainage districts, municipal building departments, and other regulatory agencies throughout planning, design, permitting, construction, and project closeout. 24 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Item-by-Item Ross meets the City Requirements City Requirement Ross Engineering Qualification Florida-licensed engineering firm Ross Engineering is authorized to provide professional engineering services in Florida. Applicable corporate and individual professional licenses are included with the proposal. Active Florida business registration Ross Engineering is an active Florida corporation established in 2003. LEED-Accredited team member Robert J. Ross, PE, LEED AP, provides project management leadership, sustainability input, constructability awareness, and coordination of technical resources throughout task-order delivery. Experience with similar government contracts Ross has more than two decades of experience providing civil engineering services to municipalities, counties, school districts, colleges, public works agencies, parks departments, and utility providers. Direct experience with the City Ross successfully completed professional civil, roadway, drainage, permitting, and construction-phase services for the City’s NE 172nd Street Roadway and Drainage Improvements project. Roadway and drainage improvements Ross provides roadway design, paving, grading, stormwater analysis, drainage structures, exfiltration systems, gravity wells, pump systems, signage, pavement markings, and right-of-way improvements. Stormwater wells and pump improvements Ross has evaluated gravity drainage wells, stormwater pump stations, pump curves, control structures, pressurized drainage systems, outfalls, backflow- prevention systems, and flood-mitigation alternatives. Water distribution and wastewater collection Ross has designed water mains, fire-flow improvements, meter relocations, hydrants, sanitary sewer systems, force mains, lift stations, and sewer rehabilitation and evaluation projects. Feasibility studies and planning Ross prepares field assessments, hydrologic and hydraulic analyses, master plans, basis-of-design memoranda, alternatives evaluations, technical reports, and recommendations. Construction documents and cost estimates Ross prepares signed and sealed plans, specifications, bid documents, quantities, and opinions of probable construction cost, updated as the design progresses. Permitting and regulatory coordination Ross has coordinated permits and approvals with municipal agencies, Miami-Dade County DERM/ RER, MDWASD, FDOT, FDEP, health departments, fire departments, water management districts, and drainage districts. Bidding and procurement assistance Ross provides pre-bid meeting support, responses to bidder questions, addenda, bid evaluation, contractor qualification review, and recommendations for award. 25 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Construction administration and inspections Ross provides submittal and shop drawing review, RFI responses, site observations, construction inspections, payment-review support, change-order review, punch lists, as-built review, certifications, and closeout documentation. Surveying, mapping, and GIS Ross will coordinate its surveying and mapping subconsultant and has experience incorporating topographic surveys, route surveys, utility data, aerial information, GIS analysis, and as-built records into civil engineering deliverables. Multidisciplinary coordination Ross’s team includes supporting Mechanical/HVAC/ Plumbing Engineering and Surveying and Mapping capabilities for task orders requiring coordinated multidisciplinary services. City representation and plan review Ross is prepared to review development documents, provide technical comments, participate in meetings and committees, assist with permit recommendations, and serve as an extension of City staff. Schedule, budget, and QA/QC control Each task order will have a defined scope, schedule, staffing plan, budget, milestone reviews, cost estimates, and documented senior quality-control review. 2.2 Schedule of Proposed Services Because assignments will be authorized individually, Ross will prepare a task-order-specific schedule for each project. The following represents our typical delivery process. Phases may be combined, accelerated, expanded, or omitted depending on the assignment. Phase Activities and Deliverables Task Order Initiation and Scope Confirmation Kickoff meeting; confirm scope, schedule, budget, responsibilities, available information, permitting agencies, supporting disciplines, and communication procedures. Existing Conditions, Survey, and Field Investigation Review records and as-builts; conduct site visits; coordinate survey and utility information; document existing conditions; identify constraints, conflicts, and data gaps. Study, Analysis, and Alternatives Perform engineering analysis, hydrologic/hydraulic modeling, feasibility evaluation, alternatives development, preliminary cost opinions, regulatory review, and recommendations. 30% Preliminary Design Establish design criteria; prepare preliminary plans, calculations, outline specifications, preliminary schedule, permitting strategy, and construction cost estimate. 60% Design Development Advance plans and calculations; coordinate utilities and subconsultants; address City comments; update specifications, quantities, schedule, and cost estimate. 90% Construction Documents Complete coordinated plans, technical specifications, bid documents, permit applications, constructability review, QA/QC review, and updated cost estimate. 100% Final Design Address final comments; prepare signed and sealed documents; finalize specifications, bid sheets, quantities, cost estimate, and permit packages. 26 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Permitting and Agency Coordination Submit permit applications; respond to comments; attend meetings; revise documents; obtain applicable approvals from the City, County, State, and other agencies. Bidding and Negotiation Assistance Attend pre-bid meeting; respond to questions; prepare addenda; evaluate bids and qualifications; assist with award recommendation. Construction Administration and Inspection Review submittals and RFIs; attend progress meetings; conduct observations and inspections; review change requests and payment documentation; prepare punch lists. Project Closeout Final inspections; review as-builts and record drawings; prepare certifications and closeout documentation; confirm permit closure and completion of outstanding items. Project Durations will be established with the City for each task order based on scope, complexity, permitting, funding, and required completion date. Ross will provide an initial task-order schedule at project initiation and update it throughout the assignment. Progress, decisions, action items, permit status, schedule risks, and corrective actions will be communicated to the City’s Project Manager through regular progress meetings and written status updates. Understanding the Issues and tasks Ross understands that this is a five-year, as-needed continuing professional services contract and that award does not guarantee a specific quantity of work. Individual assignments may vary considerably in size, urgency, technical complexity, and funding source. Ross will therefore maintain a flexible team capable of responding to small technical assignments, emergency field conditions, studies, plan reviews, permitting matters, and complete capital improvement projects. The City requires design reviews at the 30%, 60%, 90%, and 100% stages; construction cost estimates at each applicable phase; coordination of all required disciplines and utilities; permitting through the City and Miami-Dade County; construction administration; responses to RFIs; and complete record drawings at project closeout. Ross will approach each task order by first confirming: • The City’s objectives and required deliverables • Existing infrastructure and available records • Survey, utility, and field-investigation requirements • Regulatory and permitting agencies • Community, traffic, access, and operational constraints • Required supporting disciplines • Available budget and funding requirements • Design and construction schedule • Anticipated procurement and construction delivery method • Required meetings, presentations, and public coordination 27 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 2.3 Representative Project List The following projects demonstrate Ross Engineering’s relevant municipal, drainage, roadway, water, wastewater, public facility, and continuing-services experience in Miami-Dade, Broward, and Palm Beach Counties. The first three projects featured in this section fulfill MQR #2 and MQR #3 NOTE: Reference pages are found in Section 5. • City of North Miami, Continuing Engineering Contract, Utility Relocations for FDOT Projects: No. 427521-2-52-01 (SR-922); 439976-1-52-01 (SR-909), City of North Miami, FL • Miami-Dade County Water and Sewer Department, Small Diameter Contract - Small Water Main Replacement Program, Miami-Dade County, FL • Broward County Public Schools, Civil Engineering Continuing Services, Broward County, FL In addition, we have highlighted the following projects with project sheets. • Miami-Dade Water and Sewer Department, Small Diameter/Small Water Main Replacement Program, PCTS 15739, 15158, 16076, 15752, 16171, 16163, 16310, 16331, 20002, 20183, Miami-Dade County, FL • City of North Miami Drainage Basin #5 , City of North Miami, FL • Miami-Dade County Parks, Continuing Services Contract - Sanitary Sewer Evaluation Surveys, Miami-Dade County, FL • City of Deerfield Beach, Stormwater Master Plan and Permitting Assistance, Deerfield Beach, FL At the end of this section, we have provided an additional relevant Experience Matrix. Ross Engineering has established a record of responsive service, direct principal involvement, practical engineering judgment, and successful coordination with public owners, permitting agencies, contractors, subconsultants, and stakeholders. Our continuing-services experience has required Ross to mobilize quickly, develop clear task scopes, manage multiple simultaneous assignments, maintain accurate documentation, control schedules and budgets, and provide consistent service from initial authorization through closeout. Ross’s successful past performance for the City of Sunny Isles Beach is particularly relevant. The NE 172nd Street assignment progressed through analysis, design, permitting, construction support, field review, and closeout, demonstrating Ross’s ability to deliver the types of civil engineering services anticipated under this contract. Broward County Water and Wastewater Services, Engineering Services for PFAS Water Treatment and Transmission System Improvements, Broward County, FL General Engineering Services (Sidewalk/ADA Master Plan), City of Hallandale Beach, FL 28 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer NE 172nd Street Roadway and Drainage Improvements City of Sunny Isles Beach | 2022–2023 | Ross as Prime Performance Period 2022- 2023 Role Prime Consultant Total Amount of Contract $73,900 Project Description Ross Engineering, Inc. provided professional civil-roadway drainage engineering services. The project limits included the NE 172nd Street roadway right-of-way from Collins Avenue/ A1A west approximately 800 feet. The improvements were developed to address roadway drainage conditions within a constrained municipal corridor and support more reliable stormwater performance near the City’s coastal and Intracoastal drainage infrastructure. Ross Engineering’s scope included topographic and route survey services, roadway drainage analysis using ICPR 4.0, preparation of construction documents, permitting support, and civil construction administration. The drainage analysis evaluated local hydrology parameters, existing exfiltration trenches, gravity drainage wells, the existing connection to the Intracoastal Waterway, and the existing flap gate backflow prevention device. Proposed drainage improvements included raising the roadway low point, modeling multiple storm events, and incorporating injection pumps and box upgrades for the two existing drainage wells located at the roadway low points.Ross Engineering prepared 100% signed and sealed construction documents, including roadway drainage plan and profile, paving and grading plans, roadway cross sections, utility adjustment plans, pavement marking and signage plans, and stormwater pollution prevention control plans. The firm also developed drainage calculations and a drainage report with pump system design, coordinated permitting with the City of Sunny Isles Beach, Miami-Dade County DERM/RER, and FDEP, and supported the project through pre-construction coordination, shop drawing review, site inspections, as-built review, final walkthrough, punch list preparation, and closeout support. Miami-Dade County Water and Sewer Department, Small Diameter Contract - Small Water Main Replacement Program, Miami-Dade County, FL City of Miami Gardens, Lester Brown Park Improvements, City of Miami Gardens, FL 29 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Project Description Ross Engineering’s scope included a detailed hydrologic analysis of the city of North Miami Basin’s #5 and an extensive hydraulic analysis of existing and proposed stormwater pump station structures. This hydrologic analysis included data collection using DB-HYDRO, USGS and NOAA databases for rainfall, stage and flow; basin characteristics including field visits during storm events, soil testing results, existing permits, evapotranspiration and surveys. The scope of work for the hydraulic rating analysis included analyzing two existing pump stations on NE 14th Avenue and 136th Avenue (existing FLYGHT Pumps) included developing system and pump curves to approximate deficiencies. New pump stations were proposed to accommodate much larger volumes of runoff from increased development upstream. Flow rating analysis of the new structures was performed to size adequate size pumps to keep the flood prone areas dry on common storm events. Client Reference Augustin Fleur-Aime Project Manager City of North Miami 1815 NE 150th Street, North Miami, FL 33181 305-893-6511, ext. 15001 afleur-Aime@ northmiamifl.gov Role Prime Consultant Performance Period 2020 - 2020 Total Amount of Contract $50,000 City Of City of North Miami Drainage Basin #5 Ross Engineering, Inc. 17670 NW 78th Ave. Ste 214 Miami, FL 33328 Phone: 786-468-8304 Fax: 305-392-1019 www.rossengineers.com Owner / Contact Information: City of North Miami Public Works 8300 NW 53rd St. Suite 100 Miami, Fl 33166 Tel. 305-895-9830 Mr. Aleem A. Ghany, P.E. Project Manager PROJECT DESCRIPTION / SCOPE OF WORK Ross Engineering’s scope included a detailed hydrologic analysis of the city of North Miami Basin’s #5 and an extensive hydraulic analysis of existing and proposed stormwater pump station structures. This hydrologic analysis included data collection using DB-HYDRO, USGS and NOAA databases for rainfall, stage and flow; basin characteristics including field visits during storm events, soil testing results, existing permits, evapotranspiration and surveys. The scope of work for the hydraulic rating analysis included analyzing two existing pump stations on NE 14th Avenue and 136th Avenue (existing FLYGHT Pumps) included developing system and pump curves to approximate deficiencies. New pump stations were proposed to accommodate much larger volumes of runoff from increased development upstream. Flow rating analysis of the new structures was performed to size adequate size pumps to keep the flood prone areas dry on common storm events. Key Staffs: Robert J. Ross, P.E. (Sr. Hydrologist/ Engineer) Georgio Tachiev, P.E. PhD (Sr. Hydraulic Engineer) CITY OF NORTH MIAMI Drainage Basin #5 City of North Miami, FL 30 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Project Description Ross Engineering, Inc. was selected through Miami-Dade County’s EDP contract to provide general civil engineering services for Miami- Dade County Parks, Recreation and Open Spaces. Under the first task work order, Ross Engineering performed a Sanitary Sewer Evaluation Survey (SSES) for thirteen parks throughout Miami-Dade County in accordance with Miami-Dade County DERM’s SSES program. The purpose of the evaluation was to assist the County in identifying and correcting excessive infiltration and inflow (I/I) within sanitary sewer systems serving County park facilities. Ross Engineering performed site inspections and evaluations at each park, documented existing sanitary sewer conditions, and identified potential system deficiencies. Four of the parks contained less than 1,000 linear feet of gravity sewer and required smoke testing only. The remaining parks required both smoke testing and flow testing to evaluate the amount of infiltration and inflow entering the sanitary sewer system. Ross Engineering used smoke testing equipment to identify visible aboveground smoke discharge points, which indicated potential defects, leaks, or improper connections. All identified deficiencies were documented in the evaluation reports. Ross Engineering also prepared AutoCAD exhibits of the existing sanitary sewer systems within each park using aerial photography and available as-built information. The firm updated the sewer mapping by identifying new manholes, sewer lines, and system features not shown on previous record drawings. Upon completion of the evaluations, Ross Engineering prepared final reports for submittal to Miami-Dade County for review and approval. The completed work supported the County’s ongoing efforts to improve sanitary sewer system performance, reduce infiltration and inflow, and maintain reliable wastewater infrastructure within public park facilities. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)a. PROJECT OWNER21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 7/2021) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETEDPROFESSIONAL SERVICES CONSTRUCTION (If applicable)Ross Engineering was selected from the Miami Dade County EDP contract to provide General Civil Engineering Services for Miami Dade County's Parks, Recreation and Open Spaces. Our first task work order was to conduct a Sanitary Sewer Evaluation System (SSES) for thirteen parks throughout Miami Dade County as per Miami Dade County DERM's SSES program. This evaluation survey allows the County to locate and correct excessive infiltration and inflow (I/I) into the sewer lines. Ross preformed a site inspection and evaluation for each of the parks. Four of the existing parks only needed to have smoke tests performed because they had less than 1,000 feet of gravity sewer and the remaining Parks required smoke test and flow tests to check the amount of infiltration/inflow in the system. The existing system was evaluated using the smoke machine to see if there was any smoke visible above ground. All problems were indicated on the reports. The existing sewer system inside the park was drawn into AutoCad based off an aerial photograph to accurately show the existing system. The as-builts were updated by identifying new manholes or sewer lines not shown. A final report was provided to the Park to submit to Miami Dade County for approval. Contract Amount: $200,000 Continuing Service Contract: General Engineering Services, Sanitary Sewer Evaluations,Various Parks in Miami Dade CountyMiami Dade Parks & Recreation Ross Engineering, Inc.Civil Engineering/Environmental EngineeringDavie, FL Adria Gonzalez-Levia, MSCE, PE 5305.755.78522020F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)a. PROJECT OWNER21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 7/2021) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETEDPROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ross Engineering was selected from the Miami Dade County EDP contract to provide General Civil Engineering Services for Miami Dade County's Parks, Recreation and Open Spaces. Our first task work order was to conduct a Sanitary Sewer Evaluation System (SSES) for thirteen parks throughout Miami Dade County as per Miami Dade County DERM's SSES program. This evaluation survey allows the County to locate and correct excessive infiltration and inflow (I/I) into the sewer lines. Ross preformed a site inspection and evaluation for each of the parks. Four of the existing parks only needed to have smoke tests performed because they had less than 1,000 feet of gravity sewer and the remaining Parks required smoke test and flow tests to check the amount of infiltration/inflow in the system. The existing system was evaluated using the smoke machine to see if there was any smoke visible above ground. All problems were indicated on the reports. The existing sewer system inside the park was drawn into AutoCad based off an aerial photograph to accurately show the existing system. The as-builts were updated by identifying new manholes or sewer lines not shown. A final report was provided to the Park to submit to Miami Dade County for approval. Contract Amount: $200,000 Continuing Service Contract: General Engineering Services, Sanitary Sewer Evaluations,Various Parks in Miami Dade CountyMiami Dade Parks & Recreation Ross Engineering, Inc.Civil Engineering/Environmental EngineeringDavie, FL Adria Gonzalez-Levia, MSCE, PE 5305.755.78522020F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)a. PROJECT OWNER21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 7/2021) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETEDPROFESSIONAL SERVICES CONSTRUCTION (If applicable)Ross Engineering was selected from the Miami Dade County EDP contract to provide General Civil Engineering Services for Miami Dade County's Parks, Recreation and Open Spaces. Our first task work order was to conduct a Sanitary Sewer Evaluation System (SSES) for thirteen parks throughout Miami Dade County as per Miami Dade County DERM's SSES program. This evaluation survey allows the County to locate and correct excessive infiltration and inflow (I/I) into the sewer lines. Ross preformed a site inspection and evaluation for each of the parks. Four of the existing parks only needed to have smoke tests performed because they had less than 1,000 feet of gravity sewer and the remaining Parks required smoke test and flow tests to check the amount of infiltration/inflow in the system. The existing system was evaluated using the smoke machine to see if there was any smoke visible above ground. All problems were indicated on the reports. The existing sewer system inside the park was drawn into AutoCad based off an aerial photograph to accurately show the existing system. The as-builts were updated by identifying new manholes or sewer lines not shown. A final report was provided to the Park to submit to Miami Dade County for approval. Contract Amount: $200,000 Continuing Service Contract: General Engineering Services, Sanitary Sewer Evaluations,Various Parks in Miami Dade CountyMiami Dade Parks & Recreation Ross Engineering, Inc.Civil Engineering/Environmental EngineeringDavie, FL Adria Gonzalez-Levia, MSCE, PE 5305.755.78522020 MIAMI-DADE COUNTY PARKS CONTINUING SERVICE CONTRACT Sanitary Sewer Evaluation Surveys Miami-Dade County, FL Client Reference Adria Gonzalez-Levia, MSCE, PE Miami Dade Parks & Recreation 275 NW 2nd Street, Miami, FL 33128 305.755.7852 adria.gonzalez-leiva2@ miamidade.gov Role Prime Consultant Performance Period 2020 - 2020 Total Amount of Contract $200k 31 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Client Reference Thompson and Associates* James Thompson, PE 412 SE 18th St, Fort Lauderdale, FL 33316 954. 761.1073 james@thompson-inc.com Performance Period 2022-2024 Total Amount of Contract $65,000 *Ross Engineering was a subconsultant to this firm Project Description Ross Engineering, Inc. provided professional stormwater modeling and hydraulic analysis services for the West Deerfield Stormwater Capital Improvement Project in Deerfield Beach, Florida. The project supported a municipal neighborhood drainage improvement program intended to evaluate existing drainage conditions, verify stormwater modeling assumptions, and support proposed infrastructure improvements for improved roadway drainage and flood mitigation. Ross Engineering’s scope included stormwater flood routing analysis using ICPR 4.0, hydraulic modeling of the drainage system network, drainage report support, and permitting assistance. The firm evaluated local hydrology parameters, roadway right-of- way drainage conditions, proposed hydraulic connections, drainage pipes, catch basins, manholes, potential stormwater pump station improvements, control structures, outfall conditions, canal tailwater conditions, and regulatory discharge requirements. During the verification phase, Ross Engineering collected and analyzed hydrologic data for residential lots, roadway areas, sidewalks, and green areas using aerial information, recent LiDAR data, topographic survey information, as-built records, and existing City SWMM model data. The firm developed stage-area relationships, stage- storage data, weighted curve numbers, land use data, and high/low elevation data for multiple sub-basins within the approximately 100-acre watershed. Ross Engineering also created and refined existing conditions and proposed improvements ICPR models to support the verification report. The modeling effort included QA/QC of hydrologic data, development of an existing conditions ICPR model, comparison of model results with the City’s EPA SWMM model, field evaluation to ground-truth modeling assumptions, and development of proposed conditions modeling for potential stormwater improvements. Proposed improvement scenarios included drainage infrastructure such as piping, additional retention areas, swales, exfiltration trenches, control structures, and outfall modifications. Ross Engineering also provided revised stormwater flood routing modeling and permitting support in response to project development and regulatory review. This included revising the ICPR model to utilize the existing FDOT connection, eliminating the proposed control structure and outfall pipe to the County canal, revising ICPR input/output data and mapping, preparing model reports and supporting documentation, and assisting with drainage report revisions and responses to Broward County surface water permitting comments. Through stormwater modeling, hydraulic analysis, field verification, drainage report support, permitting assistance, and engineering coordination, Ross Engineering supported Thompson & Associates and the City of Deerfield Beach in advancing the West Deerfield Stormwater CIP and evaluating drainage improvements to improve neighborhood stormwater performance. ") ") ") ") ")") ") ") ") ") ") ") ") ") ") ") ")") ") ") ") ") !(!( !(!(!(!( !(!(!(!( !( !( !( !(!( !(!( !(!( !( !(!(!(!( !(!( !(!( !(!( !(!( !(!( !( !(!( !(!(!(!( !(!(!(!( !(!(!(!( !( !(!( !(!( !(!( !(!( !(!( !(!( !(!(!(!( !(!( !(!( !(!( !(!( !(!( !(!( !(!(!(!(!(!( !(!( !(!( !(!( !(!( !(!( !( !(!( !(!(!( !(!( !( !( !( !( !(!( !(!( !( !( !(!( !( !(!( !(!( !(!( !(!( !(!( !(!(!( !(!( !(!( !( !(!(!( !(!( !(!(!( !(!(!( !( !( !( !(!(!( !( !(!( !(!(!(!( !(!(!(!( !(!(!( !( !( !(!(!( !(!( Ventnor Ct VentnorGVentnor DrVentn o r P SW 32nd AveVentnor DrSW 2nd Ct SW 34th TerW Hillsboro BlvdW Sthy 810 Ventnor LSW 32nd TerS Powerline Rd Ventnor B SW 31St A v e Quie t W a t e r s P a r k Ventnor J Ventnor C Ventnor KSW 34th AveVentnor Q Ventnor Dr SW 3Rd Ct Ventnor I Ventnor D SW 3Rd Ct SW 32nd TerSW 3Rd St SW 35th AveSW 3Rd St Ventnor CresVentnor Ct Ventnor RVentnor MW Sthy 810 Ventnor OSW 31St AveSW 30th TerQuiet Waters ParkSW 33Rd AveSW 34th AveW Hillsboro Blvd SW 33Rd TerQuiet Waters Park SW 2nd St SW 1St Ct S Powerline RdSW 1St St JCS1_08 JCS1_08-S JCS1_09JCS1_09-S JCS1_100 JCS1_100-S JCS1_101JCS1_101-S JCS1_102 JCS1_103 JCS1_105-S JCS1_106-S JCS1_107 JCS1_107-S JCS1_108 JCS1_108-S JCS1_109 JCS1_109-S JCS1_110-S JCS1_111 JCS1_111-S JCS1_112 JCS1_112-S JCS1_113JCS1_113-S JCS1_114 JCS1_114-SJCS1_115 JCS1_115-SJCS1_116 JCS1_116-S JCS1_117-SJCS1_118-SJCS1_119 JCS1_120 JCS1_120-S JCS1_121 JCS1_121-S JCS1_122-S JCS1_124JCS1_124-S JCS1_125 JCS1_125-S JCS1_126 JCS1_126-S JCS1_127 JCS1_127-S JCS1_131 JCS1_16 JCS1_16-S JCS1_17 JCS1_17-S JCS1_18 JCS1_18-S JCS1_19 JCS1_19-S JCS1_22 JCS1_22-S JCS1_23 JCS1_23-S JCS1_24 JCS1_24-S JCS1_25 JCS1_25-SJCS1_26 JCS1_26-S JCS1_27 JCS1_27-S JCS1_29 JCS1_29-S JCS1_30 JCS1_30-S JCS1_31 JCS1_31-S JCS1_32 JCS1_32-S JCS1_33 JCS1_33-S JCS1_34 JCS1_34-S JCS1_35 JCS1_35-S JCS1_36 JCS1_36-S JCS1_37 JCS1_37-S JCS1_38 JCS1_38-S JCS1_39 JCS1_39-S JCS1_40 JCS1_40-S JCS1_41-S JCS1_42 JCS1_42-S JCS1_43 JCS1_44 JCS1_44-S JCS1_45 JCS1_45-S JCS1_46-S JCS1_47 JCS1_47-S JCS1_48-S JCS1_49 JCS1_49-S JCS1_50 JCS1_50-S JCS1_51-S JCS1_52-S JCS1_53 JCS1_53-S JCS1_54-S JCS1_55 JCS1_55-S JCS1_56 JCS1_56-SJCS1_57 JCS1_57-S JCS1_58 JCS1_58-S JCS1_59 JCS1_59-S JCS1_60 JCS1_60-S JCS1_61-S JCS1_62 JCS1_62-S JCS1_63 JCS1_64-S JCS1_65-S JCS1_66 JCS1_66-S JCS1_67JCS1_67-S JCS1_68-SJCS1_69 JCS1_69-S JCS1_78-S JCS1_79 JCS1_79-S JCS1_80-S JCS1_82 JCS1_83 JCS1_84 JCS1_84-SJCS1_85 JCS1_86-S JCS1_87JCS1_87-S JCS1_88JCS1_88-S JCS1_89 JCS1_89-S JCS1_90 JCS1_90-S JCS1_91 JCS1_92JCS1_92-S JCS1_93 JCS1_94 JCS1_95 JCS1_96-S JCS1_97 JCS1_99 JCS1_99-S Proposed Conditions ModelSchematic Map Figure 3-2 Sources:Aerial: Broward County, 2019Roads: Broward County ¯0 10050Feet Legend Parcels Subcatchments !(Junctions #*Outfalls ")Storages Conduit Exfiltration Gutter Flow Outlets Pumps Weirs Proposed Force Main Outfall to Canal Proposed StormwaterPump Station Proposed Outfallto Canal West DeerfieldStormwater Capital Improvement Project CITY OF DEERFIELD BEACH Stormwater Master Plan and Permitting Assistance Deerfield Beach, FL 32 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Additional Project List Project Name Role Brief Description Contact Broward County Water and Wastewater Services, District 3A System Fire Flow Improvements, Broward County, FL Subconsultant; 2025 - Ongoing Civil engineering design for water transmission mains and fire flow improvements; route selection and trenchless crossing design beneath highways and canals; permitting support and coordination with utilities and municipalities; preparation of construction documents and bidding assistance; construction‐phase engineering support and construction administration. Chen Moore and Associates - Darren Badore 500 West Cypress Creek Road, Suite 600, Fort Lauderdale, FL 33309 954.730.0707 dbadore@chenmoore.com Broward County Water and Wastewater Services, Engineering Services for PFAS Water Treatment and Transmission System Improvements, Broward County, FL Subconsultant; 2025 - Ongoing Water treatment process design including PFAS nanofiltration systems; civil‐site design for water treatment plants; potable water transmission main design; regulatory permitting and agency coordination; bidding and procurement support; construction‐ phase engineering services and construction administration; plant engineering support and future RO expansion planning. Carollo Engineers - Sandeep Sethi 2728 North University Drive, Bldg. 2700, Coral Springs, Florida 33065 305.261.2484 SSethi@carollo.com City of Miami Gardens, Continuing Civil/Architectural Consulting Assignments, Miami- Dade County, FL Subconsultant; 2022–Ongoing The work supported the City’s investment in upgraded recreational facilities, improved accessibility, expanded parking and circulation, utility upgrades, stormwater management, and long-term civil infrastructure improvements at public park sites. Services included design development, civil construction documents, paving, grading and drainage design, stormwater management, water and sanitary sewer coordination, parking lot improvements, sidewalks, ADA- accessible routes, signing and pavement markings, stormwater pollution prevention, permitting support, construction inspections, as-built review, and engineering certification. Synalovski Romanik Saye, 1800 Eller Drive, Suite 500, Fort Lauderdale, FL 33316; Merrill Romanik, AIA; 954.961.6806 Broward College Central Campus Stormwater Master Plan, Davie, Broward County, FL Subconsultant, 2021–2022 Coordinated with Thompson & Associates and Developer’s Architect; Took areas and basin characteristics from new developer site plans for Basin 1 & 3; Coordinated with Thompson staff and developer engineer on siteplans and approach; Ran multiple simulations to finalize lake sizes with Elevation 6.30 NAVD for 100 year 3 day zero discharge. Thompson & Associates, 412 SE 18th Street, Fort Lauderdale, FL 33316; James Thompson, PE; 954.761.1073 33 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer City of Hollywood, Dowdy Park and Armory Building Improvements, Hollywood, Broward County, FL Subconsultant; 2022–2024 This project includes renovations to the Former Armory building to create an indoor sports facility including basketball/batting/cages/soccer goals; ADA compliant restrooms, office space, meeting room, and storage area; exterior landscaping, parking spaces reallocation and connection to Dowdy Field. This project also includes work in the Dowdy Sports Field, specifically replacement of artificial turf field 130 x 100 yards, installation of new artificial turf field and drainage approximately 130 x 60 yards, relamp with LED sports lighting, removal of baseball netting, poles, dugout and resurface the parking area. Synalovski Romanik Saye, 1800 Eller Drive, Suite 500, Fort Lauderdale, FL 33316; Merrill Romanik, AIA; 954.961.6806 City of Miami Gardens, Lester Brown Park Improvements, City of Miami Gardens, FL Subconsultant, 2021 - 2023 Design of the site improvements, including site work, new/renovated lit walking trail, renovation and expansion of parking lot, landscaping, video surveillance system, and perimeter fencing. Additional project components include earthwork, drainage, utilities, lighting, paving and hardscape, irrigation. Merrill Romanik, AIA (SRS) 1800 Eller Drive, Suite 500 Fort Lauderdale, FL 33316 954.961.6806 mromanik@synalovski.com City of Hallandale Beach, General Engineering Services (Sidewalk/ADA Master Plan), City of Hallandale Beach, FL Prime Consultant 2011 - 2012 General Engineering Services Contract to provide the City with a sidewalk and ADA masterplan. The scope included creating a Master Plan of the City’s sidewalks and their connectivity. The assignment is to identify deficiencies and introduce solutions for sidewalk connectivity allowing for safe pedestrian usage including Americans with Disability Act (ADA). Carla Sanchez, PE 630 Northwest 2nd Street Hallandale Beach, FL 33009 954.530.8397 msanchez@cohb.org City of Hallandale Beach - Ingalls Park, City of Hallandale Beach , FL Subconsultant; 2018-2020 Complete redesign of the park including design all the drainage and grading for the new sidewalks, parking lot and pavilions. Permits for onsite and offsite were obtained from the City of Hallandale Beach, Broward County EPD, and FDOT drainage connection permit since this site was within 500’ of an FDOT right-of-way. Stratus (Formerly SRS) Merrill Romanik, AIA 1800 Eller Drive, Suite 500 Fort Lauderdale, FL 33316 954.961.6806 merrill.romanik@ stratusteam.com 34 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Brief List of Municipal and Commercial Clients MUNICIPAL • Broward College • Broward County Aviation Department • Broward County Library of Services for Environmental Services • Broward County Library of Services for Professional Engineering Services • Broward County Parks and Recreation • Broward County Public Works and Transportation • Broward County Water and Wastewater Services • Central Broward Water Control District • City of Boca Raton • City of Deerfield Beach • City of Delray Beach • City of Doral • City of Doral Public Works • City of Fort Lauderdale • City of Hallandale Beach • City of Hollywood • City of Hollywood Fire Fighters • City of Lauderhill • City of Miami Beach • City of Miami Fire Department • City of Miami Gardens • City of Miami Public Works • City of Miramar Public Works • City of North Miami • City of North Miami Public Works • City of Parkland Parks and Recreation • City of Parkland Public Works • City of Pembroke Pines • City of Sunny Isles Beach • EDSA Broward County Parks & Recreation • Federal Emergency Management Agency (FEMA) • Florida Department of Transportation Districts 1, 4, 5 and 6 • Florida International University • Miami Dade County Public Schools • Miami Dade County, FL • Miami-Dade County Department of Environmental Resource Management (DERM) • Miami-Dade County Expressway Authority • Miami-Dade County Parks & Recreation • Miami-Dade County Water and Sewer Department (WASD) • National Park Service (NPS) • North Palm Beach County Improvement District • School Board of Broward County (SBBC) • Seminole Tribe of Florida • Seminole Tribe of Florida Public Works Department • Seminole Tribe of Florida Utilities Department • South Florida Water Management District • South Florida Water Management District Big Cypress Basin (Naples) Office • South Florida Water Management District’s West Palm Beach Office • Town of Davie Engineering • Town of Davie Fire Department • US Fish & Wildlife – Hobe Sound National Wildlife Refuge HSNWR / SpecPro Environmental Services, LLC COMMERCIAL • APCTE • Aramark Uniforms • Arcadis • Archdiocese of Miami • Arco-Murray National Construction Company • Barranco Gonzalez Architects • Borelli Architects • BRG Homes • BrightStar Credit Union • Budget Rental Car • Chabad of SW Broward • CMA Architect • Cracker Barrel Restaurants • Cuellis • DYL Group • EAC Consulting • Eiglarsh Commercial Real Estate • Florida Power & Light • Franklin Academy Charter School • Gulf Design Group • Hampton Inn Hotels • HNTB • Hollywood Professional Fire Fighters • K&S Moving and Storage • Kohls Department Stores • Kosinski Architecture • LM Development Group • Macken Properties • Marriott Residence Inn Hotels • Merje • Orangemen Development and Construction • OTO Development • Prudential CRES Commercial Real Estate • Ramada Inn Hotels • Ross Realty Investments • Safeguard Storage • Service of America • Silver Builders • St. Gregory Catholic Church • St. Gregory Catholic Church • St. Lucie County School Board • St. Patrick Catholic Church • Starbucks Coffee • Synalovski Romanik & Saye • Temple Beth Torah Private • The Isles at Weston • Trion Development • University of Florida • Yeshiva Torah Emes Academy • Zyscovich (Now Stratus) 2.42.4 35 3. Staffing 36 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer THE SIZE AND EXPERIENCE OF THE COMPANY STAFF POOL FROM WHICH STAFF ASSIGNED TO THE MANAGEMENT CONTRACT CAN BE DRAWN Our firm maintains a robust and diverse staff of 15 full time professionals, providing a deep pool of experienced personnel from which project-specific teams can be assembled. Our staff includes licensed engineers, project managers, planners, designers, inspectors, and technical specialists with experience delivering civil engineering, water and wastewater design, permitting, utility coordination, project management, and construction-phase support for public-sector clients in South Florida. With a track record supporting municipal utility and infrastructure clients, Ross Engineering is prepared to provide responsive, technically sound, and client-focused service to the City of Sunny Isles This depth of resources allows us to strategically assign personnel based on the specific needs of each task, ensuring the appropriate level of expertise and efficiency. Many of our staff bring 25+ years of experience and have successfully delivered projects for municipalities and public agencies similar to the City of Sunny Isles. Our team is structured to provide continuity in project management, while also offering the capacity to quickly augment our team as needed to meet the City’s objectives. COMPOSITION OF STAFF AND RESPONSIBILITIES FOR THIS CONTRACT Ross Engineering’s proposed team for the City of Sunny Isles Beach will be led by Principal-in-Charge Melissa Ross, MSCE, who will provide executive oversight, confirm that appropriate personnel and resources are assigned to each task order, and monitor performance to ensure that the City’s expectations for quality, responsiveness, schedule, and budget are consistently met. Project Manager Robert Ross, PE, will serve as the City’s primary point of contact and will be responsible for the day-to-day management of the contract. He will coordinate Ross Engineering’s technical staff and subconsultants, develop and monitor task-order scopes, schedules, and budgets, lead progress and coordination meetings, and oversee the preparation of complete plans, specifications, cost estimates, permit documents, and other required deliverables. Robert will maintain direct communication with City staff and will be accountable for resolving issues promptly and keeping each assignment on schedule. Technical Advisor and QA/QC Lead Raymond Rammo, PE, will provide senior-level technical guidance and independent quality reviews of major deliverables. His responsibilities will include reviewing design assumptions, calculations, plans, specifications, cost estimates, permitting requirements, constructability, and interdisciplinary coordination. Raymond will also advise the project team on complex infrastructure and regulatory matters and participate in key meetings and presentations when his expertise is required. The management team will be supported by Ross Engineering’s senior engineers, engineers in training, designers, and technical production staff. Engineering Analyst Aida Yahavi Rahimi, PhD, EIT, will provide engineering analysis, modeling, calculations, data evaluation, and technical memorandum support. Remy Komocsin and Josue Crespo, EI, will support the development of design layouts and construction documents, coordinate technical details, and assist with responses to City and permitting-agency review comments. Dominique Hawkins and Daniel Vale, EI, will provide drafting, design calculations, quantity takeoffs, cost-estimate support, and CAD-standard compliance to promote accurate and efficient plan production. Project Support and Documentation Lead Matias Rodas will maintain project records, meeting minutes, action-item logs, submittal tracking, and City- required documentation. Anthony Nieves will provide construction and field support, including site observations, photographic documentation, verification of existing conditions, and constructability input. His field findings will be communicated directly to the design team so that necessary clarifications or revisions can be developed efficiently. 3. Staffing 37 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Ross Engineering will supplement its in-house staff with specialized subconsultants for mechanical, HVAC, plumbing, fire protection, commissioning, sustainability, surveying, and mapping services. All subconsultants will work under Robert Ross’ direction and will be incorporated into Ross Engineering’s communication, scheduling, document-control, and QA/QC procedures. This integrated team structure provides the City with a single point of accountability, accessible leadership, responsive project management, and the multidisciplinary expertise needed to complete task orders efficiently and successfully. SGM Engineering, Inc. (SGM) – Mechanical, HVAC, Plumbing, Fire Protection, Commissioning, and Sustainability Support SGM Engineering, Inc. will provide specialized mechanical, HVAC, plumbing, fire protection, commissioning, and sustainability services as required by individual task orders. Bobby Shahnami, PE, CxA, LEED AP BD+C, will serve as SGM’s senior mechanical engineer and commissioning authority, providing technical leadership, interdisciplinary coordination, commissioning expertise, and guidance regarding energy-efficient and sustainable building systems. He will coordinate closely with Ross Engineering’s Project Manager to confirm that SGM’s work is consistent with the City’s scope, schedule, budget, operational requirements, and applicable codes and standards. John Stellpflug, PE, will provide mechanical and HVAC engineering support, including the evaluation of existing equipment, development of system recommendations, preparation and review of calculations, and production of plans, specifications, and cost-estimate information. Hany Zareh, PE, CFPS, will lead plumbing and fire protection engineering assignments, including assessments of existing systems, code analysis, design calculations, equipment and material selections, and preparation of construction documents. The SGM team will also participate in site investigations, design coordination meetings, permitting responses, submittal reviews, construction-phase services, system observations, and commissioning activities when required. Their combined experience will provide the City with coordinated, code-compliant, maintainable, and energy-conscious building-system solutions. PROJECT MANAGER SPOTLIGHT: MAINTAINING ACCOUNTABILITY, RESPONSIVENESS, AND CONTINUITY Project Manager Robert Ross, PE, will remain actively involved throughout each task order, adjusting staffing and resources based on project complexity, schedule, and technical needs. He will establish communication procedures, monitor scope, budget, and schedule, and address issues before they affect delivery. Robert will also identify when specialized subconsultant expertise is needed and coordinate their involvement, ensuring assignments, schedules, and deliverables remain fully integrated with Ross Engineering’s work. While technical tasks will be delegated to qualified team members and subconsultants, Robert will retain overall responsibility for City coordination and timely delivery, working with Raymond Rammo, PE, Technical Advisor and QA/QC Lead, to ensure required reviews are completed at key milestones. 38 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Together, Ross Engineering and its subconsultants provide the City with accessible leadership, responsive project management, and a coordinated multidisciplinary team capable of addressing civil infrastructure, mechanical and HVAC systems, plumbing and fire protection, commissioning, sustainability, surveying, mapping, and construction- phase requirements. This team structure allows Ross Engineering to assign the appropriate personnel to each task order while maintaining clear lines of responsibility, consistent quality control, and direct accountability for scopes, schedules, budgets, and deliverables. Thomas J. Kelly, Inc. – Surveying and Mapping Thomas J. Kelly, Inc. will provide professional surveying and mapping services necessary to support Ross Engineering’s planning, design, permitting, and construction-phase assignments. Lillian Perea, President and Surveyor, will provide executive oversight, resource coordination, and quality assurance for the firm’s surveying services. She will coordinate with Ross Engineering’s Project Manager to confirm that each survey assignment is completed in accordance with the applicable task-order scope, schedule, accuracy requirements, and City standards. Jose Angel Perea IV, PSM, will serve as the lead professional surveyor responsible for planning, supervising, reviewing, and certifying surveying and mapping deliverables. Depending on the needs of each task order, the firm may provide boundary, topographic, right-of-way, control, as- built, and construction-related surveying, as well as legal descriptions, sketches, and supporting mapping. Jose will coordinate field activities, review collected information, identify apparent discrepancies or field constraints, and provide accurate base information for use by the design team. Thomas J. Kelly, Inc.’s timely field verification and survey documentation will help Ross Engineering develop reliable construction documents, reduce conflicts between proposed improvements and existing conditions, and respond efficiently to permitting and construction needs. 39 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Principal-in-Charge Melissa Ross, MSCE Quality Assurance/ Quality Control Raymond Rammo, PE Staffing/Organization Chart Our team for this RFQ was strategically chosen for this project based on their professionalism, expertise, reliability, and past relationships on previous projects. Ross has identified a 15-member multidisciplinary team for this contract, consisting of Ross Engineering personnel and key subconsultant specialists. Our firm is supported by a deep bench of additional qualified staff and technical resources, allowing us to efficiently scale our team to meet the City’s evolving needs, project demands, and schedule requirements. Ross Engineering’s proposed team provides the City with direct access to senior decision-makers, licensed professional engineers, experienced project management, senior technical review, engineering analysis, civil design production staff, documentation support, and field support personnel. Project Manager Robert Ross, PE Civil Design/Technical Production Support Remy Komocsin Engineering Analyst/ Technical Support Aida Yahavi Rahimi, PhD, EIT Civil Design/ Project Support Josue Crespo, EI Civil Engineering/Design Support Dominique Hawkins Daniel Vale, EI Project Support/ Documentation Matias Rodas Construction/Field Support Anthony Nieves Mechanical/HVAC/Plumbing Engineering Bobby Shahnami, PE, CXA, LEED AP BD+C 1 John Stellpflug,PE 1 Hany Zareh, PE, CFPS 1 Surveying & Mapping Jose Angel Perea, IV, PSM 2 Lillian Perea 2 SUBCONSULTANTS 40 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Melissa R. Ross, MSCE Principal-in-Charge Melissa is a seasoned Civil Engineer and Project Manager with over 26+ years of experience in civil and environmental engineering, with a focus on the design, permitting, and construction of public infrastructure systems. Her expertise spans project management, design, construction inspection, contract administration, and field supervision across a wide range of municipal and private sector projects throughout South Florida. Melissa’s technical background includes the design and evaluation of water and wastewater systems, including water and sewer modeling, pump station design, force and gravity mains, and septic systems. She has also performed extensive cost estimating, permitting, and utility coordination. Her construction management experience includes overseeing field inspectors, conducting pre-construction meetings, reviewing shop drawings, executing design modifications, and maintaining continuous communication among owners, contractors, and design professionals to ensure successful project delivery. In addition to water and sewer infrastructure, Melissa has extensive experience in land development, utility engineering, drainage design, roadway improvements, permitting, and inspections. She has worked with a wide variety of clients in both the public and private sectors and is known for her deep knowledge of South Florida’s regulatory environment and construction practices. Selected Experience • City of Sunny Isles Continuing Consulting Services • City of North Miami Drainage Basin #5 , City of North Miami, FL • City of North Miami, Continuing Engineering Contract, Utility Relocations for FDOT Projects: No. 427521-2-52-01 (SR-922); 439976- 1-52-01 (SR-909), City of North Miami, FL • Miami-Dade County Water and Sewer Department, Small Diameter Contract - Small Water Main Replacement Program, Miami-Dade County, FL • Miami-Dade Water and Sewer Department, Small Diameter/Small Water Main Replacement Program, PCTS 15739, 15158, 16076, 15752, 16171, 16163, 16310, 16331, 20002, 20183, Miami-Dade County, FL • Miami-Dade County Parks, Continuing Services Contract - Sanitary Sewer Evaluation Surveys, Miami-Dade County, FL • City of Deerfield Beach, Stormwater Master Plan and Permitting Assistance, Deerfield Beach, FL • Broward County Public Schools, Civil Engineering Continuing Services, Broward County, FL • Broward County Water and Wastewater Services, District 3A Years of Experience 26+ Education Master for Civil Engineering, Florida International University, Miami, FL | 2001 Bachelor of Science in Civil Engineering, Florida International University, Miami, FL | 2000 Certifications NASSCO Certified | 2018, 2024 41 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Robert J. Ross, PE, LEED® AP Project Manager Summary Robert is a Senior Civil Engineer with over 30 years of experience specializing in civil and environmental engineering design, project management, permitting, and construction inspection services throughout South Florida. He brings a strong foundation in the design and permitting of water, sewer, and fire protection systems, along with expertise in hydraulic modeling and stormwater management. Robert holds a Florida Department of Environmental Protection (FDEP) Stormwater Management Inspector certification since 2003 and became a LEED Accredited Professional in 2009, further demonstrating his commitment to sustainable and environmentally responsible design. Selected Experience • City of Sunny Isles Continuing Consulting Services • City of North Miami, Continuing Engineering Contract, Utility Relocations for FDOT Projects: No. 427521-2-52-01 (SR-922); 439976-1-52-01 (SR-909), City of North Miami, FL • Miami-Dade County Water and Sewer Department, Small Diameter Contract - Small Water Main Replacement Program, Miami-Dade County, FL • Miami-Dade Water and Sewer Department, Small Diameter/ Small Water Main Replacement Program, PCTS 15739, 15158, 16076, 15752, 16171, 16163, 16310, 16331, 20002, 20183, City of North Miami Drainage Basin #5 , City of North Miami, FL • General Engineering Services Contract: Sanitary Sewer Evaluation for Various Parks, Miami Dade County, FL • City of Miami Gardens Continuing Civil/Architectural Consulting Assignments, Miami-Dade County, FL • City of Hollywood, Dowdy Park and Armory Building Improvements, Hollywood, Broward County, FL • City of Miami Gardens, FL Lester Brown Park Improvements • City of Hallandale Beach, FL General Engineering Services (Sidewalk/ADA Master Plan) • City of Hallandale Beach, FL Ingalls Park • City of Deerfield Beach, Stormwater Master Plan and Permitting Assistance, Deerfield Beach, FL • Broward County Public Schools, Civil Engineering Continuing Services, Broward County, FL • Broward College Central Campus Stormwater Master Plan, Davie, Broward County, FL Years of Experience 30+ Education Master for Civil Engineering, Florida International University, Miami, FL | DNF Bachelor of Science in Civil Engineering, Florida International University, Miami, FL | 2000 Bachelor of Engineering Technology, University of Central Florida, Orlando, FL | 1994 Certifications Florida Engineer, #59485 LEED Certification No. 10445757 | 2009 FDEP Stormwater Management Inspector | 2003 – Inspector #5318 42 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Raymond Rammo, PE Quality Assurance/Quality Control Summary Raymond is a Senior Civil Engineer with over 35 years of experience delivering municipal and utility infrastructure projects for consulting firms, power generation companies, and state and city governments. His expertise includes the planning, funding, permitting, design, and construction administration of drainage and stormwater systems, water and wastewater infrastructure, roadways, site development, pumping stations, treatment facilities, parks, and solid waste facilities. Raymond has managed projects through the full lifecycle, from feasibility and design through construction observation, inspection, commissioning, start-up, O&M manual preparation, and operator training. He leads multidisciplinary teams of subconsultants and contractors while ensuring regulatory compliance, quality control, and adherence to schedules and budgets. His experience reflects a consistent record of delivering resilient, cost-effective drainage and civil infrastructure solutions for public-sector clients. Selected Experience • Broward County Water and Waste Water PFAS Removal at WTP-1A and WTP-2A, Broward County, FL Additional Expertise • Managed various capital projects, scoping, design, bidding, permitting and construction as a part of the Waste Innovations project in Fort Lauderdale. • Managed various sewer consent order program projects at the Public Works Department for the City of Fort Lauderdale, such as: asset inventory for the entire City’s Sewer System infrastructure; Design Build for various sized force main drains; citywide sewer conveyance system and water distribution system hydraulic modeling and evaluation studies. • Held various positions in South Florida including Director of Public Works for North Bay Village, Project Manager with the City of Fort Lauderdale, and Project Manager with the City of Dania Beach. • Oversaw the design and construction management and provided QA/QC for projects in Miami-Dade, Broward and Palm Beach Counties (2015-2017) including oversight of the Miami-Dade County North, Central, and South wastewater treatment plants consent decree improvements; hydraulic modeling and evaluation, new water transmission pipe; and Shenandoah new water transmission system design and construction inspection, as well as the stormwater pump station design-build projects for the City of Miami Beach. • Held roles within the State of Florida such as: Director of Engineering at Broward County Health Department; Assistant Director at the Public Utilities Department in the City of Hollywood. Years of Experience 35+ Education Master in Science, Environmental Engineering (Water and Wastewater Treatment), Northeastern University Bachelor of Science, Honors in Civil Engineering, University of Southampton Certifications Florida Engineer, #49644 Federal Emergency Management Administration (FEMA)/National Incident management System (NIMS) – ICS-100, ICS-200, ICS300, ICS- 400, ICS-700, ICS-701, ICS-702, ICS-703, ICS-704, and ICS-800. Certified Stormwater Inspector in the States of Florida and Michigan 43 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Aida Rahilmi, PhD, EIT Engineering Analyst/Technical Support Summary Aida is a Water Resources Engineer with experience supporting hydrologic and hydraulic analysis, stormwater management, flood risk assessment, and watershed planning projects. She brings strong technical expertise in watershed- scale modeling, best management practice (BMP) evaluation, and green stormwater infrastructure (GSI) planning, using tools such as SWMM, SWAT/ SWAT+, HEC-HMS, HEC-RAS, ArcGIS, and Python. Dr. Rahimi’s experience includes regulatory-focused modeling, infrastructure prioritization, and performance evaluation of stormwater systems across urban, agricultural, and mixed-use watersheds. She is recognized for her attention to detail, practical approach to complex water resource challenges, and ability to deliver clear, implementable solutions that support project goals from planning through design. Selected Experience • Broward County Water and Waste Water PFAS Removal at WTP-1A and WTP-2A, Broward County, FL. • City of Fort Lauderdale I&I Program, Fort Lauderdale, FL Other Expertise • Performed SSES inspection on private systems in Miami Dade County, help prepare reports and provide repair recommendations to client. • Evaluated the sanitary sewer onsite via CCTV and provided repair recommendations to client. • Experience in the planning, design, and analysis of stormwater and drainage systems for urban and mixed-use environments, with a strong understanding of local and state regulatory requirements. • Demonstrated expertise in watershed-scale hydrologic and hydraulic modeling to support flood risk assessments and the evaluation of infrastructure adjacent to rivers, channels, and transportation corridors. • Proven ability to support feasibility and condition assessments for rehabilitation and new development projects, integrating technical analysis with regulatory and permitting considerations. • Experience reviewing engineering designs for technical accuracy, code compliance, and constructability, supporting quality control and risk reduction for project teams. • Familiarity with piping system design coordination and construction oversight, ensuring conformance with design intent, technical standards, and project requirements. Years of Experience 7+ Education Ph.D. in Civil Engineering, Water Resources Management, Florida International University Master in Science, in Civil Engineering, Water Resources Management, FIU Bachelor in Science & Master in Science, Civil Engineering, Water Resources Management, University of Tabriz Certifications NASSCO certificate Graduate certificate in GIS, Florida International University SWAT+ Advanced Workshop (16 hours), 2025 Awards FIU Dissertation Fellowship (2025). 5th Place, ASCE Southeast Student Symposium (2025), Sustainable Solutions Competition (enhance resilience against riverine flooding under both current FEMA maps and projected future hydrologic conditions). 3rd Place, ASCE Southeast Student Symposium (2024), Jacobs Solutioneering Competition (prepare a disaster relief plan for hurricane category 4 and mitigation strategy using FEMA maps). Florida Stormwater Association Educational Foundation Scholarship (2023). 44 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Remy Komocsin Civil Design/Technical Production Support Summary Remy is a Project Engineer with over three years of experience in civil and environmental engineering design, water and sewer main design and permitting, hydraulic modeling, and site inspections. Mr. Komocsin is currently designing utilities and drainage using Civil 3D for all the plan and profiles and cross sections for Ross Engineering’s public and private sector clients throughout South Florida and working on several design projects in both Broward and Miami-Dade Counties. Selected Experience • Broward County Public Schools, Civil Engineering Continuing Services, Broward County, FL • Broward County Water and Waste Water PFAS Removal at WTP-1A and WTP-2A, Broward County, FL • City of Hollywood, Dowdy Park and Armory Building Improvements, Hollywood, Broward County, FL • Broward College Central Campus Stormwater Master Plan Davie, FL. • City of Miami Continuing Contract: Lester Brown Park Miami Gardens, FL • City of Deerfield Beach, Stormwater Master Plan and Permitting Assistance, Deerfield Beach, FL Years of Experience 5 Education Bachelor in Science, Ocean Engineering, Florida Atlantic University, 2020 National Science Foundation Learn Undergraduate Research Scholar, Florida Atlantic University, 2020 Certifications N/A Josue Crespo, EI Civil Design/Project Support Summary Josue is a civil project engineer with experience delivering site civil, utility, and infrastructure projects from design through construction in South Florida. Selected Experience • Broward County Water and Waste Water PFAS Removal at WTP-1A and WTP-2A, Broward County, FL • Broward County W&W Emergency Fire Flow Pipeline improvements for 3A DistributionSystem, Broward County, FL • City of Boca Raton,Spanish River Park Facility improvements , Boca Raton, FL Years of Experience 2 Education Bachelor of Science, Civil Engineering, Florida International University Certifications OSHA 30 - Construction Safety and Health Engineer In Training (E.I.T.) Certificate 45 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Matias Rodas Project Support/Documentation Summary Matias is a Project Engineer with over three years of experience in civil engineering design and Construction Management, Before joining our design team in-house, Matias was one of our MDWASD CLR inspectors for Miami Dade County Water and Sewer contract. For that contract he was the onsite inspector working with Miami Dade to inspect the contractors work relocating the water services from the back of the properties to the front and reconnecting to the new water main along the street and updating the County’s GIS system. Currently, Matias is Ross Engineering’s construction inspections for all the municipal, public and private projects. Matias has inspected civil-site projects including roadway, drainage, water and sanitary sewer mains to ensure that the construction matches the design plans. As part of his experience, he has replied to RFI’s, reviewed change orders, provided final punch-list and final close-out letters to various agencies. Selected Experience • City of North Miami Engineering Design Services Biscayne Park Water Main Extension, North Miami, FL • Miami-Dade County Water and Sewer Department’s Consumer Line Relocation (CLR) Program, Miami, FL. • Miami Dade County Water and Sewer Department NW 22nd Ave Wastewater Collection/Transmission System Expansion and Water Distribution Systems Improvement for the North Sub- Basin (D2-C-1), Miami-Dade County, FL. • Miami Dade Water and Sewer Department Watermain Replacement along Alhambra Circle, Miami, FL. • Miami Dade County Water and Sewer Department Small Diameter Contract – Design and Install 1,265 LF of 8” DIP WM along Bahama Drive (PCTS 15752), Miami, FL • Miami Dade County Water and Sewer Department Small Diameter Contract – Design and Install 1,720 LF of 8” DIP WM along NW 15th St between NW 17TH & 19TH Ave (PCTS 16163) • City of Hallandale Beach General Engineering Services Sidewalk/ADA Master Plan Project, Hallandale Beach, FL • City of Hallandale Beach Continuing Services Contract Professional Engineering Services, Hallandale Beach, FL • City of Hallandale Beach Ingalls Park Hallandale Beach, FL • City of Fort Lauderdale, Continuing Consulting Contract Bayview Drive Drainage Improvement Project, Fort Lauderdale, FL Years of Experience 2 Education Bachelor of Science | Florida International University | 2023 Research in Geyser Phenomenon in Water Pipes | 2023 Certifications N/A 46 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Daniel Vale, EI Civil Engineering /Design Support Summary Daniel is a Civil Project Engineer with experience in land development and municipal infrastructure projects across South Florida. He specializes in preparing detailed civil design plans and coordinating with utility providers, municipalities, and regulatory agencies to ensure timely project delivery and compliance. His project background includes water main replacement projects with the Miami-Dade Water and Sewer Department, paving, grading, and drainage design for residential developments in Miami Beach, and water and sewer utility design for single-family homes. Daniel has also supported civil design and site improvements for municipal parks in Broward County, completed five-year drainage certifications for both private properties and Broward County Schools, and assisted with drainage and site upgrades for educational facilities. Involved throughout the full project cycle, Daniel contributes to design, permitting, and construction coordination, working collaboratively with multi-disciplinary teams to deliver efficient, code-compliant, and sustainable infrastructure solutions. Selected Experience • Miami-Dade County Water and Sewer Department Small Diameter Contract - Small Water Main Replacement Program – Atlas R26 (PCTS 16297), Miami, FL • Miami-Dade County Water and Sewer Department - Small Diameter Contract NW 22nd Ave (PCTS 15158). • Miami Dade County Water and Sewer Department Small Diameter Contract – Design and Install 1,720 LF of 8” DIP WM along NW 15th St between NW 17TH & 19TH Ave (PCTS 16163), Miami, FL • Sanitary Sewer Evaluation Surveys for Private Properties, Miami, FL • Modena 87 Affordable Housing/Mixed-Use Development, Miami, FL Years of Experience 2 Education Bachelor of Engineering, Civil Engineering, Florida International University | 2024 Certifications Engineer in Training 47 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Dominique Hawkins Civil Engineering/Design Support Summary Dominique Hawkins is an Engineer at Ross Engineering in Davie, FL with 4 years of experience in the pipeline industry. During her career, Dominique has gathered experience assisting with design, data collection and project coordination. She’s collaborated on projects involving BCWWS, City of Coral Springs, Port Everglades, BCPS and MDWASD. Since her time at FAU, Dominique has been involved with ASCE, currently serving as the ASCE Broward Branch Vice President and ASCE Florida Section YMG Vice President. Selected Experience • MDWASD Project No. PCTS 16297 SWMRP ATLAS R26 Design, Miami, FL • Broward County Water and Waste Water PFAS Removal at WTP-1A and WTP-2A, Broward County, FL • Broward County Public Schools, Project No. #Stratus Team, DCOTA Ohana Institute/Kaplan Academy 2026 Years of Experience 4 Education Bachelor’s of Science, Civil Engineering, Florida Atlantic University Anthony Nieves Construction/Field Support Years of Experience 3 Education Bachelor of Science, Environmental Engineering , Florida Atlantic University Summary Anthony is a motivated, detail-oriented engineering professional with three years of experience in the land development industry, specializing in water main, reclaimed water, sewer main, force main, and drainage systems. He brings a diverse background and a strong ability to adapt his communication style, shifting seamlessly from friendly and approachable to highly professional as needed. Selected Experience • Broward County Water and Waste Water PFAS Removal at WTP-1A and WTP-2A, Broward County, FL 48 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Lillian Perea PRESIDENT; SURVEYOR Summary Lillian has served as President of Thomas J. Kelly, Inc. for more than 35 years. She is responsible for executive leadership, business operations, contract administration, financial management, client relations, and project coordination. Selected Experience • St. Theresa Catholic School & Valencia Avenue Right-of-Way Survey, Coral Gables, FL • Monster Carwash – Construction Surveying Services, Stuart, FL • King Ranch Culvert Replacement As-Built Survey, Belle Glade, FL Years of Experience 35 Education Bachelor of Arts in Economics, | Florida International University Jose Angel Perea IV, PSM SURVEYOR Summary Jose is a Florida Professional Surveyor and Mapper with over 10 years of progressive experience in boundary, topographic, ALTA/NSPS, and construction surveying. Experienced in managing survey projects from proposal through final deliverables, preparing legal descriptions and certifications, performing least-squares adjustments using STAR*NET, and producing survey deliverables using Autodesk Civil 3D. Selected Experience • St. Theresa Catholic School & Valencia Avenue Right-of-Way Survey, Coral Gables, FL • Monster Carwash – Construction Surveying Services, Stuart, FL • King Ranch Culvert Replacement As-Built Survey, Belle Glade, FL Years of Experience 10 Education Certifications Professional Surveyor and Mapper Florida License No. PSM #LS7646 Bachelor of Science, Computer Engineering | Florida Atlantic University Bachelor of Arts | University of Miami, English | 2011 49 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Bobby Shahnami, PE, CXA, LEED AP BD+C FP Engineer Summary Bobby, President of SGM Engineering, has extensive experience in program management, business development, project management, and construction management. He is highly skilled in managing multiple projects simultaneously across the mechanical, plumbing, and fire protection engineering disciplines. Having contributed to more than 3,000 projects during his career with SGM, he possesses a comprehensive understanding of both the design and construction industries. Selected Experience • City of Fort Lauderdale, FL Continuing Contract, • Florida Department of Management Services MEP Continuing Contract • Orange County Government MEP/Commissioning Continuing Contract, Orange County, FL • City of Orlando Continuing Contract, City of Orlando, FL • Greater Orlando Aviation Authority Continuing Contract, Greater Orlando Aviation Authority, FL • Florida International University Continuing Services Contract • Fort Lauderdale Public Works Administration & EOC Building HVAC Renovation, City of Fort Lauderdale • City of Hollywood Beach Community Center • Cooper City HS MEP Renovations, School Board of Broward County, FL • Orlando Fire Department Design-Build Fire Station #9, City of Orlando, FL • Public Works EOC Building HVAC Renovation, City of Fort Lauderdale, FL • Miami Beach Pocket Park, City of Miami Beach, FL • Miami Sewell Park, City of Miami, FL • City of Fort Lauderdale Police Headquarters Firing Range HVAC • Barnett Recreation Center, Orange County, FL • Seminole County Sheriff’s Office Communication Center, Seminole County Government • Seminole County Fire Station 11, Seminole County Government Years of Experience 27 Education BS in Mechanical Engineering, University of Central Florida Certifications FL Engineer #78419 ACG Certified Commissioning Authority LEED Accredited Professional Building Design & Construction 50 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer John Stellpflug, PE Mechanical/Plumbing/FP Engineer Summary John brings more than 41 years of mechanical engineering experience and is a licensed Professional Engineer in Florida, Maryland, Washington, and Wisconsin. He has extensive experience designing energy-efficient HVAC and plumbing systems for higher education, government, and institutional facilities. His technical expertise encompasses chilled-water, direct-expansion, hot-water, and steam systems, as well as central plant design and upgrades, making him highly qualified to support municipal infrastructure and continuing- services assignments. Mr. Stellpflug consistently delivers designs that meet the highest professional standards while addressing each project’s unique operational and technical requirements. Selected Experience • City of Fort Lauderdale, FL Continuing Contract • City of Orlando, FL Continuing Services Contract • Orange County FL Government Continuing Contract • Broward College Continuing Services Contract • Marion County Public Schools Continuing Contract, Marion County Public Schools, Marion County, FL • Internal Operations Center II Chiller Replacement, Orange County Government, FL • Public Works Administration & EOC Building HVAC Renovation, City of Fort Lauderdale, FL • Police Headquarters Firing Range HVAC Renovation, City of Fort Lauderdale, FL • St. Cloud City Hall BAS Upgrade, City of St. Cloud, FL • City of Riviera Beach, FL Public Safety and Public Works Conversion • Orange County, FL Courthouse Complex Upgrades • Corrections Government Office Chiller Expansion, Orange County Government, FL • Fort Lauderdale Public Works Administration EOC Building HVAC Renovation, City of Fort Lauderdale, FL • Fort Lauderdale Police Headquarters Firing Range HVAC Upgrade, City of Fort Lauderdale, FL • Fort Lauderdale 6th Floor IT Data Center HVAC Upgrade, City of Fort Lauderdale, FL Years of Experience 41 Education Bachelor of Science, Mechanical Engineering, Walla Walla University Certifications FL Engineer: #68794 51 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Hany Zareh, PE, CFPS Senior Mechanical/Plumbing and Fire Protection Engineer Summary Hany is a highly qualified and licensed Professional Engineer as well as a Certified Fire Protection Specialist (CFPS) who brings over 25 years of extensive experience in the design, installation, and ongoing maintenance of HVAC, plumbing, and fire protection systems. Throughout his distinguished career, he has developed a diverse and comprehensive background by working with a wide range of clients including higher education institutions, various government agencies, aviation facilities, and large-scale public infrastructure projects. This broad exposure has provided him with a deep and nuanced understanding of complex building systems and the unique challenges presented by campus environments, enabling him to deliver effective and innovative engineering solutions tailored to each project’s specific needs. Selected Experience • Osceola County Continuing Services Contract, Osceola County Government, FL • City of Orlando Continuing Service Contract, City of Orlando • Haines City Emergency Operations Center, City of Haines City • Village of Wellington Aquatic Center | Village of Wellington • Orange County Convention Center West Bldg BAS Upgrade, Orange County, FL • OCPS Palmetto Elementary School Comprehensive, Orange County Public Schools, Orange County, FL • Olympia High School Comprehensive Renovation, Orange County Public Schools, Orange County, FL • Ocoee Middle School Comprehensive Renovation, Orange County Public Schools, Orange County, FL • Lawton Chiles Elementary School Comprehensive, Orange County Public Schools, Orange County, FL • Timber Creek High School Comprehensive Renovation, Orange County Public Schools, Orange County, FL • Parkway MS - New addition, School Board of Broward County, Broward County, FL • Dommerich ES & Maitland MS Multisystem Capital Renewal, Orange County Public Schools, Orange County, FL Years of Experience 26 Education Bachelor of Science, Mechanical Engineering, Cairo University Bachelor of Science, Mechanical Engineering, Valencia College Certifications FL Engineer: #88541 NY Engineer: #104835 Certified Fire Protection Specialist 52 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Current Workload Ross Engineering, Inc. has reviewed its recent and current workload and confirms that the firm has adequate staff capacity to support the City of Sunny Isles. The following workload chart identifies Ross Engineering’s current and recently completed projects, including the services provided, total fees, current project phase or completion status, manpower allocation, estimated duration, and proposed availability. Projects currently on hold for more than sixty (60) days have not been included in the manpower projections. The accompanying workload availability chart demonstrates that Ross Engineering maintains available staffing capacity in all projected quarters. The chart shows the firm’s workload allocation as a percentage of available capacity, along with the remaining percentage available for new assignments. As current projects are completed, Ross’ workload decreases, and staff availability increases, allowing the firm to provide the City of Sunny Isles with timely support for assigned civil engineering task orders. Project / Client Services Provided Total Fees Construction Value Current Phase or Completed Estimated Duration Cumulative Availability for MDC %Currently Under Contract Delivery Method Percent (%) Completion Bonded / Name of Surety The School Board of Broward County Civil Engineering Continuing Contract Civil site grading and drainage design, permitting and construction inspection, BODRs, 5 year Drainage Re- Certifications for various schools $1,250,000 $15,000,000 70%06/15/2026 - 12/1/2028 Yes Plans, Reports and Engineering certifications letters 70% (Year 3 of 5YR Contract)N/A SBBC Stephen Foster Elementary School Watermain Replacement Water main Design, permitting and Construction Inspection $75,000 $1,526,000.00 70%08/10/2025- 12/15/2026 Yes Design/Bid/Build 75%N/A Miami-Dade County Thomas Jefferson Middle School Drainage Analysis,Design, permitting and civil construction admin $95,000 $500,000.00 15%08/30/2025- 12/30/2027 Yes Design/Bid/Build 100%N/A MDWASD Small Diameter Pipeline Contract Water Main Design, permitting and Construction Inspection; BODR for Water Mains and Septic to Sewer Conversions (Currently in CM phase) $3,400,000 $570,000,000.00 85%06/01/2017- 06/01/2027 Yes Design/Bid/Build 85%N/A MDCPS-West Brickell Middle School Water, sewer, Drainage design, new roadway design along SW 3rd Ave, permitting and Construction Inspection $125,000 $35,000,000 90%08/10/2025- 12/15/2026 YES Design/Bid/Build 95%N/A City of Fort Lauderdale Consultant Services for city-wide inflow and Infiltration Reduction Program Sanitary Sewer Evaluation Survey, Inspections, GIS, Reports and Maps $1,500,000 $50,000,000 75%01/10/2023- 12/15/2026 Yes Design/Bid/Build 95%N/A City of Miami Gardens Civil-Architecture Continuing Consulting Contract Drainage Modeling Analysis, roadway and drainage design, permitting and civil construction engineering & inspection $50,000 $500,000 50%01/10/2023- 12/15/2027 Yes Design/Bid/Build 99%N/A City of Boca Raton-Continuing A&E Contract Drainage Modeling Analysis using ICPR (Stormwise) to support a 100 Acre neighborhood improvement project with Level of Service D flooding. Assisted with Permitting with SFWMD and BCEPD $70,000 $4,500,000 80%06/10/2025- 12/15/2027 Yes Design/Bid/Build 98%N/A Broward County Water & Wastewater PFAS Removal for WTP1A and WTP-2A Drainage Modeling Analysis using ICPR (Stormwise) to support a 100 Acre neighborhood improvement project with Level of Service D flooding. Assisted with Permitting with SFWMD and BCEPD $70,000 $4,500,000 80%09/01/2025- 01/30/2030 Yes Design/Bid/Build 98%N/A Total Availability Staff Available to MDC Staff Available to MDC Staff Available to MDC Staff Available to MDC Notes Notes Notes Notes Notes Notes Section 5.2 Recent and Current Workload The Applicant shall document the extent of its services and total fees (the “Workload”) for projects completed or ongoing within the past ten (10) years. Documentation of all current Workload for projects shall include (1) current phase of the projects under commission by the Applicant; (2) Applicant’s manpower allocation in response to the current Workload; and (3) the estimated duration of the specified task. Applicants shall document proposed allocation of manpower in relation to its current Workload relative to this Project. Project(s) currently on hold for a period in excess of 60 days shall not be included in the manpower projections. Label this Response to Section 5.2 53 4. Approach/Methodology 54 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Ross Engineering, Inc. has organized this section to respond directly to both the proposal format required by Section 4 of the solicitation and the Approach to Project Management criteria on which this section is scored. The methodology that follows is the same disciplined, earned-value-based project-management system Ross applies on its continuing-services and task-work-order contracts throughout South Florida, scaled to the size, urgency, and risk of each assignment the City of Sunny Isles Beach authorizes. Quick Key to Ross Engineering’s Responses to City’s Requirements Approach/Methodology Where Addressed Suitability of the methodologies and approaches used in achieving tasks 4.1 Understanding of the Contract; 4.2 Suitability of Methodology Overall organization to completing the project 4.3 Project Organization and Accountability Work plan explaining how deadlines will be met 4.4 Task-Order Work Plan Approach to Project Management – Cost Control 4.5.1 Cost Control, Cost Estimating, and Value Engineering Approach to Project Management – Scheduling 4.5.2 Scheduling and Ability to Meet Deadlines Approach to Project Management – Quality Control / Quality Assurance 4.5.3 Quality Control and Quality Assurance Ability to meet desired timelines and deadlines 4.4 Work Plan; 4.5.2 Scheduling Communication with the City’s Project Manager 4.6 Communication and Project Documentation How complaints are handled and brought to the City’s Project Manager 4.7 Complaint and Issue Resolution 4.1 UNDERSTANDING OF THE CONTRACT Ross Engineering understands that the City of Sunny Isles Beach is establishing an as-needed continuing professional services contract under which assignments may vary in size, urgency, technical complexity, and duration. Some task orders may involve a focused site evaluation, feasibility analysis, plan review, cost estimate, permitting consultation, or technical memorandum. Others may require complete engineering services through survey, investigation, design, permitting, bidding, construction administration, field observation, record drawings, and project closeout. The City’s anticipated General Civil Engineering assignments include roadway and drainage improvements, conversion of stormwater wells to pressurized systems through the addition of pumps, water-distribution and wastewater-collection systems, pump stations, injection wells, pipelines, NPDES permitting, surveying and GIS, feasibility studies, construction documents, cost estimates, bidding assistance, construction administration, inspections, plan review, grant support, and representation of the City before governmental and regulatory agencies. Ross will approach each assignment as an extension of City staff. Our objective is to give the City a responsive local team that understands the assignment, establishes clear expectations before work begins, verifies existing conditions, identifies risks early, and delivers practical solutions within the authorized scope, schedule, and budget. Our methodology rests on six principles: early scope definition, direct senior involvement, field-verified information, proactive schedule and cost control, continuous quality review, and open communication with the City’s Project Manager. These principles have supported Ross’s work under continuing-services and task-order contracts for municipalities, utilities, educational institutions, parks departments, and other South Florida public agencies. 4. Approach/Methodology 55 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 4.2 SUITABILITY OF METHODOLOGY – TASK-SPECIFIC APPROACH Ross tailors its methodology to the needs and risk level of each assignment. A small plan-review task is not burdened with the process required for a major roadway, drainage, utility, or pump-system project; conversely, a complex infrastructure assignment receives the investigation, modeling, interdisciplinary coordination, permitting strategy, constructability review, and quality control it requires. This scalability is what makes a single continuing-services methodology suitable across the full range of work the City may authorize. • SCOPE DEFINITION AND THE TASK-ORDER WORK BREAKDOWN STRUCTURE At the beginning of each task order, Ross meets with the City’s Project Manager to confirm the purpose of the assignment, limits of work, required deliverables, available information, design and construction budgets, schedule milestones, permitting requirements, supporting disciplines, and the responsibilities of each participant. The discussion also addresses traffic, public access, utilities, resident and business impacts, City operations, funding requirements, and other conditions that influence project delivery. Ross then converts the confirmed scope into a task-specific Work Breakdown Structure (WBS), a task outline that lists every activity required to complete the assignment and assigns to each a responsible team member, an estimate of labor effort, any subconsultant participation, a deliverable, a review period, and a budget. The WBS is the single foundation from which both the fee budget (Section 4.5.1) and the project schedule (Section 4.5.2) are built and controlled, so that cost and schedule are always measured against the same defined units of work. Assumptions and exclusions are documented so the City and Ross begin each assignment with a common understanding of the work. • EXISTING CONDITIONS AND TECHNICAL EVALUATION Engineering decisions are based on verified information. Ross reviews available surveys, record drawings, GIS data, utility records, permits, inspection reports, prior studies, models, and maintenance information, then conducts site observations to confirm visible conditions and identify discrepancies between records and field conditions. Depending on the assignment, additional investigation may include topographic or route surveys, subsurface utility information, geotechnical testing, drainage- system inspections, rainfall and groundwater records, pump-performance data, fire-flow information, or hydrologic and hydraulic modeling. These needs would be coordinated by Ross, as appropriate. The City’s dense urban development, constrained rights-of-way, coastal influences, high groundwater, existing utilities, and active roadways make early field verification especially important. Identifying these conditions before design advances reduces the likelihood of utility conflicts, redesign, permitting delays, and construction changes. These are the same conditions that, left undiscovered, drive both cost overruns and schedule slippage. • ALTERNATIVES AND RECOMMENDATIONS Where an assignment involves a study or alternatives analysis, Ross will evaluate each option for technical performance, permitting feasibility, construction cost, constructability, compatibility with existing infrastructure, maintenance requirements, useful service life, public disruption, operating cost, resilience, and potential phasing. Major alternatives would be discussed with the City before a preferred solution is advanced, and recommendations are supported by appropriate calculations, drawings, cost information, and a clear explanation of the advantages, limitations, and risks of each option, allowing the City to make informed decisions before substantial design effort is incurred. 56 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 4.3 PROJECT ORGANIZATION AND ACCOUNTABILITY Ross provides a streamlined management structure with direct access to senior decision-makers and one clear line of responsibility. The same three individuals lead every task order, giving the City continuity of accountability across the life of the contract. Melissa Ross, MSCE. Principal-in-Charge. Melissa provides executive oversight of the continuing contract and is responsible for contract-level coordination, resource allocation, staffing continuity, and overall accountability. She remains accessible to the City’s Project Manager for staffing priorities, competing deadlines, contractual concerns, and the commitment of additional resources. Robert J. Ross, PE, LEED AP. Project Manager and Primary Point of Contact. Robert manages the day-to-day performance of individual task orders and is the principal project-level contact with the City. He leads scope development and the WBS, assigns staff, coordinates subconsultants, manages schedules and budgets, conducts progress meetings, oversees permitting, tracks review comments, and coordinates bidding and construction-phase services. Robert also keeps the City’s Project Manager informed of status, decisions, outstanding information, potential risks, and recommended corrective actions. Raymond Rammo, PE. Technical Advisor and QA/QC Lead. Raymond provides independent senior technical guidance and leads Ross’s quality assurance and quality control process, reviewing design criteria, calculations, modeling, plans, reports, specifications, permitting requirements, cost estimates, constructability, interdisciplinary coordination, and construction-phase technical responses. He oversees formal reviews at project milestones and confirms that significant technical comments are resolved before documents are submitted to the City. This management team is supported by engineering analysts, civil designers, engineer interns, CAD- production personnel, documentation staff, and construction and field-support personnel. Supporting subconsultants provide Mechanical/HVAC/Plumbing Engineering, Surveying and Mapping as required. Ross remains the prime consultant and civil engineering lead; all supporting work is coordinated through Robert and reviewed under Raymond’s QA/QC leadership. The structure gives the City direct principal involvement, a dedicated Project Manager, independent senior technical review, and sufficient production capacity to support multiple concurrent assignments. 57 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 4.4 TASK-ORDER WORK PLAN Ross applies the following work plan to each assignment. The phases are combined, expanded, accelerated, or omitted as appropriate to the task order, and each phase carries defined deliverables, review points, and budget drawn from the task-order WBS. Phase Ross Engineering’s Approach 1. Authorization and Scope Confirmation Review the City’s request, confirm objectives and deliverables, identify required personnel and subconsultants, conduct the kickoff meeting, and establish the authorized scope, WBS, schedule, budget, communication procedures, and responsibilities. 2. Existing Conditions and Investigation Review available records; perform site observations; coordinate surveying, utility locating, and specialty investigations when provided or separately authorized by the City; and identify physical, regulatory, operational, and public-access constraints. 3. Analysis and Preliminary Recommendations Complete applicable modeling, calculations, condition assessments, feasibility analysis, permit research, alternatives evaluation, and preliminary cost comparisons. Present major findings and obtain City direction. 4. Design Development Prepare and coordinate the applicable 30%, 60%, 90%, and 100% documents/ plans, calculations, specifications, quantities, cost estimates, permit materials, and responses to City comments. 5. Permitting and Bidding Coordinate with regulatory agencies, perform pre-application meetings, respond to permit comments, support pre-bid activities, answer bidder questions, prepare addenda, evaluate bids, and assist the City with recommendation for award. 6. Construction-Phase Services Review submittals and RFIs, attend meetings, conduct authorized observations or inspections, document field conditions, evaluate proposed changes, assist with payment and change-order reviews, and coordinate permit certifications. 7. Closeout Conduct final observations, prepare and verify punch-list items, review as-built information and record drawings, assist with permit closure and certifications, and provide the City with final project records. The City requires a design schedule, construction cost estimates by phase, coordinated design services, progress reviews at the 30%, 60%, 90%, and 100% stages, permitting, complete construction documents, construction administration, responses to RFIs, and revised record drawings at completion. This work plan incorporates each of those requirements directly, and the milestone reviews it establishes are the same points at which Ross updates cost estimates (Section 4.5.1) and performs formal QA/QC (Section 4.5.3). • MILESTONE DESIGN REVIEWS »30%: Establish the design basis, preliminary layout, design criteria, major utility considerations, permitting strategy, schedule, and initial cost estimate; confirm overall direction before detailed design proceeds. »60%: Advance the approved concept with coordinated plans, calculations, utilities, supporting disciplines, preliminary specifications, updated quantities, and an updated cost estimate. »90%: Documents substantially complete; perform formal QA/QC and constructability reviews, confirm interdisciplinary coordination, reconcile plans with specifications and bid items, and update the construction cost estimate and schedule. »100%: Address final comments; issue signed and sealed documents, final specifications, quantities, bid information, permit-response materials, and the final opinion of probable 58 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer construction cost. 4.5 APPROACH TO PROJECT MANAGEMENT This subsection responds to the three elements on which the City scores project management: Cost Control, Scheduling, and Quality Control/Quality Assurance. All three are driven from the same task-order WBS and are managed on earned-value principles, so that at any point in an assignment Ross can tell the City what has been produced, what it has cost, and where the work stands against schedule. • 4.5.1 COST CONTROL, COST ESTIMATING, AND VALUE ENGINEERING Ross manages two budgets on every assignment: the authorized professional-services (fee) budget and the anticipated construction budget. Both are controlled with the same discipline. »Controlling the professional-services budget. At authorization, Robert builds the fee budget on the task-order WBS, allocating labor hours, subconsultant amounts, and expenses to each activity and phase. This baseline becomes the yardstick for the assignment. At each reporting period, Ross estimates the percent complete of each task against measurable milestones, not simply hours spent, and compares the value of work actually produced to both the labor expended (a cost check) and the planned progress (a schedule check). When a variance develops, Ross determines the cause, recalculates the effort required to complete the task, and raises the issue with the City before the overall task-order budget is affected, rather than reporting an overrun after it has occurred. »Developing construction cost estimates. Opinions of Probable Construction Cost (OPCC) are developed at a level of detail appropriate to each design phase. Estimates are built from quantity takeoffs against the evolving plans and priced using recent local bid tabulations, published unit-cost data, and vendor quotations for major or long-lead items, with explicit line items for mobilization, maintenance of traffic, utility work, permitting, escalation, and a contingency scaled to the maturity of the design. »How often estimates are updated, and the accuracy that is targeted. Estimates are updated at the 30%, 60%, 90%, and 100% milestones. Ross prepares estimates on the industry-standard principle that estimate accuracy tightens as design advances: an early conceptual estimate carries a wider expected range and a larger contingency, and each successive milestone narrows both as scope, quantities, and site conditions become better defined. At every update, material changes from the prior estimate are identified and explained to the City so there are no surprises between milestones. These estimate-to-bid and bid-to-final comparisons are documented and used to sharpen future estimates. For Sunny Isles Beach task orders, Ross will report the achieved estimate- to-award and award-to-final variance to the City as bid and final-cost information becomes available, giving the City a documented, project-specific record of accuracy rather than an unsupported figure. • Value engineering. Ross treats value engineering as a continuous part of planning and design, not an end-stage cost-cutting exercise, and never at the expense of safety, code compliance, durability, or required performance. The most reliable savings come from reusing sound existing infrastructure, avoiding relocations, simplifying construction, easing long-term maintenance, and ") ") ") ") ")") ") ") ") ") ") ") ") ") ") ") ")") ") ") ") ") !(!( !(!(!(!( !(!(!(!( !( !( !( !(!( !(!( !(!( !( !(!(!(!( !(!( !(!( !(!( !(!( !(!( !( !(!( !(!(!(!( !(!(!(!( !(!(!(!( !( !(!( !(!( !(!( !(!( !(!( !(!( !(!(!(!( !(!( !(!( !(!( !(!( !(!( !(!( !(!( !(!(!(!( !(!( !(!( !(!( !(!( !(!( !( !(!( !(!(!( !(!( !( !(!( !( !(!( !(!( !( !( !(!( !( !(!( !(!( !(!( !(!( !(!( !(!(!( !(!( !(!( !( !( !(!( !(!( !(!(!( !(!(!( !( !( !( !(!(!( !( !(!( !(!(!(!( !(!(!(!( !(!(!(!( !( !(!(!( !(!( Ventnor Ct VentnorGVentnor DrVentn o r P SW 32nd AveVentnor DrSW 2nd Ct SW 34th TerW Hillsboro BlvdW Sthy 810 Ventnor LSW 32nd TerS Powerline Rd Ventnor B SW 31St A v e Qui e t W a t e r s P a r k Ventnor J Ventnor C Ventnor KSW 34th AveVentnor Q Ventnor Dr SW 3Rd Ct Ventnor I Ventnor D SW 3Rd Ct SW 32nd TerSW 3Rd St SW 35th AveSW 3Rd St Ventnor CresVentnor Ct Ventnor RVentnor MW Sthy 810 Ventnor OSW 31St AveSW 30th TerQuiet Waters ParkSW 33Rd AveSW 34th AveW Hillsboro Blvd SW 33Rd TerQuiet Waters ParkSW 2nd St SW 1St Ct S Powerline RdSW 1St St JCS1_08 JCS1_08-S JCS1_09JCS1_09-S JCS1_100 JCS1_100-S JCS1_101JCS1_101-S JCS1_102 JCS1_103 JCS1_105-S JCS1_106-S JCS1_107 JCS1_107-S JCS1_108 JCS1_108-S JCS1_109 JCS1_109-S JCS1_110-S JCS1_111 JCS1_111-S JCS1_112JCS1_112-S JCS1_113JCS1_113-S JCS1_114 JCS1_114-SJCS1_115 JCS1_115-SJCS1_116 JCS1_116-S JCS1_117-SJCS1_118-SJCS1_119 JCS1_120 JCS1_120-S JCS1_121 JCS1_121-S JCS1_122-S JCS1_124JCS1_124-SJCS1_125 JCS1_125-S JCS1_126 JCS1_126-S JCS1_127 JCS1_127-S JCS1_131 JCS1_16 JCS1_16-S JCS1_17 JCS1_17-S JCS1_18 JCS1_18-S JCS1_19 JCS1_19-S JCS1_22 JCS1_22-S JCS1_23 JCS1_23-S JCS1_24 JCS1_24-S JCS1_25 JCS1_25-SJCS1_26 JCS1_26-S JCS1_27 JCS1_27-S JCS1_29 JCS1_29-S JCS1_30 JCS1_30-S JCS1_31 JCS1_31-S JCS1_32 JCS1_32-S JCS1_33 JCS1_33-S JCS1_34 JCS1_34-S JCS1_35 JCS1_35-S JCS1_36 JCS1_36-S JCS1_37 JCS1_37-S JCS1_38 JCS1_38-S JCS1_39 JCS1_39-S JCS1_40 JCS1_40-S JCS1_41-S JCS1_42 JCS1_42-S JCS1_43 JCS1_44 JCS1_44-S JCS1_45 JCS1_45-S JCS1_46-S JCS1_47 JCS1_47-S JCS1_48-S JCS1_49 JCS1_49-S JCS1_50 JCS1_50-S JCS1_51-S JCS1_52-S JCS1_53 JCS1_53-S JCS1_54-S JCS1_55 JCS1_55-S JCS1_56 JCS1_56-SJCS1_57 JCS1_57-S JCS1_58 JCS1_58-S JCS1_59 JCS1_59-S JCS1_60 JCS1_60-S JCS1_61-S JCS1_62 JCS1_62-S JCS1_63 JCS1_64-S JCS1_65-S JCS1_66 JCS1_66-S JCS1_67JCS1_67-S JCS1_68-SJCS1_69 JCS1_69-S JCS1_78-S JCS1_79 JCS1_79-S JCS1_80-S JCS1_82 JCS1_83 JCS1_84 JCS1_84-SJCS1_85 JCS1_86-S JCS1_87JCS1_87-S JCS1_88JCS1_88-S JCS1_89 JCS1_89-S JCS1_90 JCS1_90-S JCS1_91 JCS1_92JCS1_92-S JCS1_93 JCS1_94 JCS1_95 JCS1_96-S JCS1_97 JCS1_99 JCS1_99-S Proposed Conditions ModelSchematic Map Figure 3-2 Sources:Aerial: Broward County, 2019Roads: Broward County ¯0 10050Feet Legend Parcels Subcatchments !(Junctions #*Outfalls ")Storages Conduit Exfiltration Gutter Flow Outlets Pumps Weirs Proposed Force MainOutfall to Canal Proposed StormwaterPump Station Proposed Outfallto Canal West DeerfieldStormwater Capital Improvement Project 59 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer allowing phased implementation. »Value-engineering example – West Deerfield Drainage. Ross revised the ICPR drainage model to route through an existing FDOT connection, which supported eliminating a proposed control structure and an outfall to a County canal. Removing the structure removed its construction cost, its permitting burden, and its long-term maintenance obligation, while the revised model confirmed the required drainage performance was still met. This is a direct example of maintaining performance and reducing cost at the same time. »Value-engineering example – City of Sunny Isles Beach, NE 172nd Street Roadway and Drainage Improvements. On the City’s own NE 172nd Street project, Ross evaluated the existing exfiltration trenches, gravity drainage wells, Intracoastal connection, and flap gate before advancing roadway grading and pump improvements, and incorporated that serviceable infrastructure into the recommended solution rather than assuming complete replacement. This controlled construction cost while delivering the drainage and roadway performance the City required. 4.5.2 SCHEDULING AND ABILITY TO MEET DEADLINES Continuing-services contracts require rapid mobilization and the ability to manage several assignments at once. Ross’s scheduling process begins with a realistic baseline schedule built from the task-order WBS rather than a generic commitment to a due date. Developing the schedule. For each assignment, Robert identifies the required activities, their durations and dependencies, the City and agency review periods, and the critical path, and sets internal completion dates in advance of City deadlines so that QA/QC review is never compressed. This is the same earned- value framework used for cost: progress is measured against the scheduled value of work, so schedule slippage is visible early. Maintaining the schedule. Schedule status is reviewed at each progress meeting and updated as work advances. For active or time-sensitive assignments, Ross uses a short-interval look-ahead schedule. Because permitting, utility coordination, survey work, and subsurface investigation typically sit on the critical path, Ross maintains a permitting-and-coordination log that tracks each required approval, the responsible agency and contact, planned and actual submittal dates, review periods, comments, response dates, outstanding information, and anticipated approval dates. Pre-application meetings are requested where they can clarify agency expectations and reduce avoidable review cycles. »Ability to meet deadlines across concurrent task orders. Ross monitors workload and personnel availability throughout the contract. Melissa provides contract-level resource oversight, Robert manages task-order staffing, and Raymond schedules technical reviews ahead of submission deadlines. When necessary, qualified staff are supplemented or reassigned to maintain progress while preserving continuity of the key personnel identified in this proposal, allowing Ross to meet deadlines on several simultaneous assignments. »Managing schedule risk. Potential schedule risks: regulatory-review delays, incomplete records, utility conflicts, unforeseen field conditions, material availability, contractor coordination, weather, public-access limitations, or changes in scope, are communicated when identified, not held until the next submittal. Ross’s notice describes the issue, the affected milestone, the anticipated impact, available mitigation, the City decisions required, and a recommended recovery plan such as resequencing activities, adding resources, or advancing unaffected work while protecting the City’s budget and objectives. »Scheduling challenge and how Ross solved it – City of City of North Miami Engineering Design Services Biscayne Park Water Main Extension – Robert J. Ross, PE, LEED AP was the Engineer of Record for the water main extension task work order to extend the existing 6” water main along NE 9th Ave. The project included coordination with the Public Works Director Mr. Wisler Pierre-Louis to discuss the scope of work and Ross’s role on the project. Approximately 1,000 linear feet of 6” PVC water main extension and two new fire hydrants were designed along NE 9th Ave and connected into the existing 6” on NE 10th Ave. Plans and profiles were designed for the water main extension showing all of the conflicts in the roadway and swale areas. Permits were obtained for this project through City of North Miami, Miami Dade County Health Department, and Miami Dade Fire Department. The construction was inspected, and certification was obtained through the Health Department. There were no project delays – the project started on time and was completed with no amendments, charge orders and the project was not stopped for any reason. Miami-Dade County Parks & Recreation Dept. - Biscayne Park Watermain Extension City of North Miami, FL Reference City of North Miami Wisler Pierre-Louis, P.E., LEED AP – Public Works Director pwisler@northmiamifl.gov 305-895-9833 Contract Amount # Key Project Features Civil Engineering Water Resources Engineering Completion Engineering Services: Start: 2013 Completed: 2014 60 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer North Miami, Biscayne Park Water Main Extension. The scheduling challenge on this assignment was multi-agency approval: design, permitting, construction inspection, and certification all had to clear the City, the Miami-Dade County Health Department, and the Miami-Dade Fire Department, and if those reviews had run in sequence they would have pushed the project well past its target completion. Ross addressed the risk by identifying conflicts early, producing complete plan-and- profile documents that minimized agency comment cycles, coordinating the three agency approvals on a deliberately managed track, and remaining engaged through construction. The project began and was completed on schedule with no project delays, contract amendments, change orders, or work stoppages, demonstrating how early conflict identification and coordinated permitting keep a multi-agency assignment on time. 4.5.3 QUALITY CONTROL AND QUALITY ASSURANCE Quality control occurs throughout each assignment rather than only before final submission, and it is led independently. Raymond Rammo, PE, who is not responsible for producing the deliverables he reviews, sets the level of review appropriate to each task order based on its scope, complexity, and risk. »Aligning quality expectations up front. At kickoff, Ross confirms the City’s explicit requirements (codes, standards, and contract deliverables) and its implicit expectations for the assignment, so that the delivered product meets both the professional standard of care and what the City actually expects. The most common source of client dissatisfaction is a gap between the two, and Ross closes it at the outset. »Quality during design (process quality). Ross’s reviews confirm the design criteria, source information, survey data, calculations, modeling, plan-to-calculation consistency, utility coordination, permit requirements, interdisciplinary coordination, constructability, maintenance considerations, quantities, cost estimates, specifications, and bid items. At the 30%, 60%, 90%, and 100% milestones, Ross maintains a comment-resolution log identifying each comment, the responsible team member, the required action, the disposition, and verification of closure. Robert ensures comments are incorporated; Raymond confirms that significant technical and interdisciplinary matters are resolved before documents go to the City. »Quality during construction (outcome quality). Quality control continues through submittal and RFI review, documentation of field observations, evaluation of proposed changes, coordination of design clarifications, punch-list preparation, and review of record drawings. »What the reviews are designed to protect. In infrastructure work the leading trigger of claims, agency comments, and avoidable change orders is errors and omissions. Ross’ checking process is aimed squarely at preventing them and at delivering plans that are biddable and buildable, constructible, durable, operable, maintainable, accessible, and economical over their life cycle with the objective, being measurable attributes by which the quality of an engineering deliverable is judged. This continuous process reduces omissions, inconsistent documents, agency comments, field conflicts, redesign, and change orders, which protects the City’s schedule and budget as directly as it protects 61 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer technical quality. 4.6 COMMUNICATION AND PROJECT DOCUMENTATION Robert Ross serves as the City’s primary project-level contact, providing one coordinated source of information. Technical personnel participate in meetings and correspondence when their specialized input is required, but project direction, decisions, and commitments are coordinated through Robert. Communication is scaled to the assignment and may include kickoff meetings, regular progress meetings, written status reports, meeting minutes, action-item logs, design-decision records, permit logs, utility-coordination records, review-comment logs, RFI and submittal logs, field reports, schedule updates, and cost-estimate updates. Ross documents significant decisions, responsible parties, required actions, and due dates, and distributes meeting minutes promptly so misunderstandings are corrected before they affect the work. Matters requiring City direction are clearly identified rather than allowed to remain unresolved. The project file maintains the information necessary to demonstrate the history and current status of each assignment, including correspondence, field observations, agency comments, calculations, plans, permit documentation, construction records, and closeout materials, with dedicated documentation support for meeting notes, permit tracking, submittals, RFI logs, field reports, and closeout records. 4.7 COMPLAINT AND ISSUE RESOLUTION Ross recognizes that complaints may originate from City staff, residents, businesses, property owners, contractors, utilities, permitting agencies, or other stakeholders, and may involve drainage, traffic, access, noise, construction operations, utility service, safety, schedule, communication, property impacts, or the quality of consultant services. Ross handles every complaint through the same accountable procedure and always brings it to the attention of the City’s Project Manager. »Receipt and documentation. Any complaint received by a Ross team member is forwarded promptly to Robert and entered into an issue log recording the date, complainant, project location, nature of the concern, potential safety or service implications, assigned investigator, required response, status, and final disposition. »Notification to the City. Robert brings the matter to the City’s Project Manager. Conditions involving public safety, flooding, utility interruption, traffic hazards, potential property damage, regulatory noncompliance, or significant public impact are communicated immediately by telephone or another agreed emergency method, followed by written documentation. Routine concerns are reported promptly, generally within one business day. »Investigation. Ross reviews the relevant plans, calculations, permits, field records, photographs, inspection reports, contractor documentation, correspondence, and site conditions, conducting a field visit when needed to determine the cause and extent of the issue. »Recommended action. Ross provides the City’s Project Manager with its findings, the apparent cause, any immediate measures already taken, available corrective actions, cost or schedule implications, responsible parties, and recommended follow-up. Ross does not commit the City to additional cost, time, liability, or contractual changes without authorization. Resolution and closeout. Following City direction, Ross coordinates the approved action, documents its completion, updates the issue log, and confirms closure with the City’s Project Manager. Recurring concerns are reviewed for trends, and lessons learned are incorporated into subsequent design, communication, or construction procedures. This ensures complaints are documented, investigated, communicated to the City, and resolved through an accountable procedure rather than handled informally or without follow- 62 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer through. 4.8 COMMITMENT TO THE CITY Ross Engineering will provide the City with responsive leadership, disciplined project management, practical engineering judgment, proactive schedule and cost control, and documented quality review from task authorization through final closeout. Our direct experience on the City’s NE 172nd Street Roadway and Drainage Improvements project gives Ross familiarity with Sunny Isles Beach’s coastal drainage conditions, constrained roadway environment, existing drainage wells, pump-system needs, utility coordination, permitting requirements, and construction-phase expectations, allowing Ross to mobilize efficiently while still evaluating each new assignment on its own conditions. Ross’s goal is to deliver civil engineering services that are technically sound, permittable, constructible, maintainable, cost-conscious, clearly documented, and completed within the schedule and budget established with the City. Through Melissa’s executive oversight, Robert’s day-to-day project management, Raymond’s independent technical and QA/QC leadership, and the support of Ross’s engineering and specialty-consultant team, the City will receive one accountable source for the successful delivery of each assignment. 63 5. References 64 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer1. City of North Miami 65 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Phone: ____________________________________________ Email: ___________________________________________ 1.Q: Rate the firm’s success in providing their services as it relates to the project. A: 2.Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: 3.Q: Would you use them again? A: 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: 5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: 6.Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ ZŽƐƐŶŐŝŶĞĞƌŝŶŐ͕/ŶĐ͘ DŝĂŵŝͲĂĚĞtĂƚĞƌĂŶĚ^ĞǁĞƌĞƉĂƌƚŵĞŶƚ KĨĨŝĐĞ͗ϳϴϲ͘ϱϱϮ͘ϰϰϬϬ͖Ğůů͗ϯϬϱ͘ϮϬϱ͘ϬϵϬϮ ĚĂŶŝĞů͘ůŝnjĂƌĂnjŽΛŵŝĂŵŝĚĂĚĞ͘ŐŽǀ ĂŶŝĞů>ŝnjĂƌĂnjŽ͕W͕Es^W Excellent. Ross has successfully delivered design and engineer-of-record services on the Department's Small Diameter Water Main Replacement Program (PCTS 15739, 15158, 16076, 15752, 16171, 16163, 16310, 16331, 20002, and 20183), and their work has consistently met the Department's requirements. Very competent and highly accessible. Ross has supported the Department on a wide range of projects over many years, and their staff have consistently been responsive, technically strong, and easy to work with through design and construction. Yes, without reservation. Yes. Ross devoted the time and personnel needed to complete each of these projects. Four of them alone accounted for well over 50,000 linear feet of water main design, and they have delivered many more for the Department over the years with the same level of commitment. Excellent. Their deliverables were consistently on time and complete, meeting the reporting dates and content required under the agreement. Ross has been a reliable partner to the Department for a long time. Their deliverables have consistently been of good quality, and they are proactive in identifying and resolving issues before they affect the project. AMI Program Director 2. Miami-Dade Water and Sewer Department (PCTS) 66 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) Ross Engineering, Inc. Firm giving Reference: _Broward County Public Schools Phone: _O ffice: 754-321-4200; Cell: 954-205-7105 Email: _tthomas@browardschools.com 1. Q: Rate the firm’s success in providing their services as it relates to the project. A: Excellent 2. Q: Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: Excellent 3. Q: Would you use them again? A:yes 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: Excellent yes 5. Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: Excellent 6. Q: Is there anything else we should know, that we have not asked? A:no The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: Teresa A. Thomas, CIEC Title Coordinator Environmental Compliance Sign Name: Date: 7/23/2026 RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net 3. School Board of Broward County 67 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 41 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net REFERENCE QUESTIONNAIRE It is the responsibility of the proposer to provide a minimum of three (3) different references other than City of Sunny Isles Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Firm) _______________________________________________________________ Firm giving Reference: ____________________________________ _______________________________ Phone: ____________________________________________ Email: ___________________________________________ 1.Q: Rate the firm’s success in providing their services as it relates to the project. A: 2.Q:Rate the competence and accessibility of the personnel directing, supervising and performing the work on your project. A: 3.Q: Would you use them again? A: 4. Q: Rate the level of commitment of the firm toward your project. Did the firm devote the time and personnel necessary to successfully complete your project? A: 5.Q: Rate the firm’s success at providing the services as specified in the agreement meeting reporting dates and content? A: 6.Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion. Name: _______________________________________ Title _____________________________________________ Sign Name: __________________________________ Date: ___________________________________________ ZŽƐƐŶŐŝŶĞĞƌŝŶŐ͕/ŶĐ͘ DŝĂŵŝͲĂĚĞtĂƚĞƌĂŶĚ^ĞǁĞƌĞƉĂƌƚŵĞŶƚ KĨĨŝĐĞ͗ϳϴϲ͘ϱϱϮ͘ϰϰϬϬ͖Ğůů͗ϯϬϱ͘Ϯϴϭ͘ϴϳϰϲ ƌƵĚLJ͘ŝďĂƌƌĂΛŵŝĂŵŝĚĂĚĞ͘ŐŽǀ ZƵĚLJ/ďĂƌƌĂ͕W______________________ ______________________ Excellent consultant. Strong design engineering and CAD skills They were professional, attentive, and committed to delivering excellent results yes The team was very involved and highly committed to this project. They did a great job Ross delivered high-quality work with timely submissions. The plans are currently at the 90% CD level, and they have met every deliverable to date 08/10/2026 Project Manager WASD Pipeline Section 4. Miami-Dade Water and Sewer Department (R-26) 68 6. Contract Forms 69 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 36 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net DELIVER TO: City of Sunny Isles Beach DemandStar.com REQUEST FOR QUALIFICATIONS SECTION 6 BID SUBMITTAL FORMS OPENING: 11:00 A.M. 8/4/2026 PLEASE QUOTE PRICES F.O.B. DESTINATION, LESS TAXES, DELIVERED IN CITY OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should be less all taxes. Tax Exemption Certificate furnished upon request. Issued by: Procurement Department Date Issued: 7/7/2026 This Bid Submittal Consists of Pages 36-43 Sealed bids are subject to the Terms and Conditions of this Request for Proposal and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ # 26-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES FOR ARCHITECTURAL AND ENGINEERING SERVICES (CCNA) Proposer Name: ________________________________________ Commodity Code(s): SUBMIT YOUR PROPOSAL ON DEMANDSTAR.COM FAILURE TO SIGN PAGE 35 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON-RESPONSIVE Ross Engineering, Inc. MDC-TCC 03-01: Site Development & Parking Lot Design • NIGP Commodity Code: 925-17 (Civil Engineering) or 925-44 (General/Site Engineering) MDC-TCC 03-02: Major Highway Design & 03-02B: Minor Highway Design • NIGP Commodity Code: 925-46 (Highway Engineering) MDC-TCC 03-09: Signing, Pavement Marking, & Channelization • NIGP Commodity Code: 925-88 (Traffic/Transportation Engineering) MDC-TCC 06-01: Water Distribution & Sanitary Sewage Collection & Transmission • NIGP Commodity Code: 925-61 (Water/Wastewater Engineering) or 925-86 (Sanitary & Wastewater Engineering) MDC-TCC 06-02: Water & Sanitary Sewage Pumping Facilities • NIGP Commodity Code: 925-31 (Electrical Engineering) / 925-65 (Mechanical Engineering) subset or 925-61 (Water/Wastewater Engineering) MDC-TCC 10-01: Stormwater Drainage Design Engineering Services • NIGP Commodity Code: 925-28 (Drainage Engineering) MDC-TCC 16: General Civil Engineering • NIGP Commodity Code: 925-17 (Civil Engineering) MDC-TCC 17: Engineering Construction Management • NIGP Commodity Code: 958-26 (Construction Management Services) or 925-33 (Engineering Services, Professional) NAICS 541330: Engineering Services • NIGP Crosswalk Commodity Code: 925-00 (Engineering Services, Professional) / 925-17 (Civil Engineering) 70 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 37 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID PROPOSER NAME: AUTHORIZED SIGNATURE: DATE: TITLE OF OFFICER: Melissa Ross; Ross Engineering, Inc. July 10, 2026 President 08/10/2026 July 20, 2026 July 22, 2026 July 23, 2026 July 28, 2026 July 29, 2026 August 3, 2026 August 7, 2026 August 10, 2026Addendum #9, Dated 71 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Ross Engineering, Inc. 6.3 ACKNOWLEDGEMENT FORM - REVISED ADDENDUM 5 NAME OF COMPANY: ___________________________________________ (Name of Proposer Submitting RFQ) CHECK DISCIPLINES YOU ARE APPLYING FOR: 1-ARCHITECTS ____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: MECHANICAL, HVAC & PLUMBING ENGINEERS___ b.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: STRUCTURAL ENGINEERING SERVICES ___ 2-LANDSCAPE ARCHITECTS____ 3-GENERAL CIVIL ENGINEERS____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: MECHANICAL, HVAC & PLUMBING ENGINEERS___ b.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: STRUCTURAL ENGINEERING SERVICES ___ c.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT OR IN-HOUSE STAFF FOR SURVEYORS AND MAPPING___ d.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT OR IN-HOUSE STAFF FOR: GEOTECHNICAL SERVICES___ 4-ELECTRICAL ENGINEERS___ 5-SURVEYORS AND MAPPING____ 6-ENVIRONMENTAL / COASTAL ENGINEERING____ a.PLEASE INDICATE IF YOUR FIRM HAS A SUB-CONSULTANT FOR: GEOTECHNICAL SERVICES ___ 7- TRANSPORTATION / TRANSIT / TRAFFIC ENGINEERING____ 8- CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____ ✓ Yes. ✓ Yes. ✓ Yes. No, Not Applicable. No, Not Applicable. 72 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 39 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net QUESTIONNAIRE MUST BE INCLUDED WITH FIRM’S PROPOSAL Proposer must list projects of similar project scope fulfilling the following qualification requests: 1. List Project Management Personnel. Personnel cannot be changed without written approval. Assigned Project Manager: 1.2 Principal-in-Charge: 2. How many years has your organization been in business as a Consultant? 3. List current workload. 4. Is the Proposer subcontracting any part of this work? If so, give details to major key sub - Consultant’s name, address, phone number and type of work to be performed. Also, indicate the percentage of the total work to be performed by the sub-Consultant. 5. The business is a (sole proprietorship) (partnership) (corporation) and name of owner: Corporation; Melissa Ross, President Robert Ross, PE Melissa Ross Ross Engineering has been in business for 23 years as a professional consultant. See Page 52 for a detailed workload. • SGM Engineering, Inc. (SGM) for Mechanical, HVAC, & Plumbing Engineering 5301 Waterford District Drive, Suite 750, Miami, FL 33126 | 954-421-1944 Percentage of Total Work: Varies by Task Order; to be determined based on the authorized scope. • Thomas J. Kelly, Inc. for Surveying and Mapping 9445 SW 100th Street, Miami, FL 33176 | 786-242-7692 Percentage of Total Work: Varies by Task Order; to be determined based on the authorized scope. 73 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 40 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net 6. Has your company ever been debarred or terminated for default on a government contract? 7. Proposer must list any exceptions taken to the terms and condition in this RFQ. 8. Describe the Proposer’s attributes, which make the Proposer best-suited for this project. 9. Proposer is a Certified Minority Business: Yes _______ No_______ 10. Specify address of Proposer’s designated office where the majority of work on projects will be performed: 11. Consultant’s volume of work performed for the City of Sunny Isles Beach as a consultant and as a sub-consultant – currently and previously. END OF SECTION No. None. Ross Engineering, Inc. is exceptionally qualified to provide continuing General Civil Engineering services to the City of Sunny Isles Beach because our firm combines more than two decades of South Florida civil and water resources engineering experience, direct prior experience with the City, a responsive Miami-Dade County office, experienced professional leadership, and demonstrated success delivering municipal projects under continuing-services and task work order contracts. 17670 NW 78th Street, Ste. 214, Miami, FL 33015 Ross provided professional civil and roadway drainage engineering services for the NE 172nd Street Roadway and Drainage Improvements Project, extending west from Collins Avenue/A1A within a constrained municipal corridor near the Intracoastal Waterway. ✓ 74 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 42 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net BID SUBMITTAL FORM RFQ # 26-07-01 CONTINUING ARCHITECTURAL AND ENGINEERING SERVICES The undersigned Proposer proposes and agrees, if this Bid is accepted, to enter into a Contract with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Proposer accepts all of the terms and conditions of the Advertisement or Request for Qualifications and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposer agrees to sign and submit the Contract and other documents required by the Bidding Requirements within ten days after the date of the City’s Notice of Award via Commission approval. In submitting this Bid, the Proposer represents, as more fully set forth in the Contract, that: ▪ The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. ▪ The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. ▪ This Proposal is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advant age over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the Notice to Proceed. Proposer Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________Fax No. _________________________ Email Address: _______________________________FEIN No. __/__-__/__/__/__/__/__/__ Ross Engineering, Inc. mross@rossengineers.com 786-468-8304 4 5 0 5 0 0 4 8 2 305-392-1019 17670 NW 78th Street, Ste. 214, Miami, FL 33015 75 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 43 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net *“By signing this document the bidder agrees to all Terms Signature: __________________________________________________________________ (Signature of authorized agent) Print Name: _________________________ Title:_________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. Melissa Ross, MSCE President 76 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Affidavit of Compliance with Anti-Human Trafficking Laws City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 The undersigned, on behalf of the entity listed below (“Entity”), hereby attests, under penalty of perjury, as follows: 1. Entity does not use coercion for labor or services as defined in Section 787.06, Florida Statutes. (Source: § 787.06 (13), Florida Statutes – Human Trafficking). 2. The undersigned is authorized to execute this affidavit on behalf of Entity. Date: ____________________, 20___ Signed: Entity: Name: Title: STATE OF COUNTY OF The foregoing instrument was acknowledged before me, by means of ☐ physical presence or ☐ online notarization, this ____ day of ______________, 20____, by _______________________________, as ____________________________ for _____________________________________________________, who is personally known to me or who has produced ________________________ as identification. Notary Public Signature: State of Florida at Large (Seal) Print Name: My commission expires: Ross Engineering, Inc. August 10 26 Melissa Ross President Florida 10th August 26 Melissa Ross President Ross Engineering, Inc. Juan Alonso 08/06/2027 Miami-Dade ✓ 77 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer Non-Collusion 121&2//86,21$)),'$9,7 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 67$7(2))/25,'$ &2817<2)BBBBBBBBBBBBB The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, _____________________________________________________________ (Name of Corporation, Partnership, Individual, etc.) a, ________________________________, formed under the laws of _____________ (Type of Business) (State) of which he is ________________________________________________. (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. ______________________________________________________________________ $)),$17¶61$0($)),$17¶67,7/( TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this _____ day of _______________________, 200_. Personally Known ________ or Produced Identification ________; Type of identification ___________________________________ (Affix seal here) ___________________________________ 127$5<38%/,&(name printed or typed) DECEMBER 28, 2010 Miami-Dade Ross Engineering, Inc. FloridaCivil Engineering Firm President Melissa Ross, MSCE President August10th 26 Juan Alonso ✓ 78 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 38%/,&(17,7<&5,0(6 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 6:25167$7(0(1738568$17726(&7,21D )/25,'$67$787(62138%/,&(17,7<&5,0(6 38%/,&(17,7<&5,0(6 Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". 7+,6)2500867%(6,*1('$1'6:25172,17+(35(6(1&(2)$127$5<38%/,&2527+(5 2)),&,$/$87+25,=('72$'0,1,67(52$7+6 This sworn statement is submitted to City of Sunny Isles Beach _____________ by____________________________________________________________________________ [print individual’s name and title] for____________________________________________________________________________ [print name of entity submitting sworn statement] whose business address is: _______________________________________________________________________________ _______________________________________________________________________________ and (if applicable) its Federal Employer Identification number (FEIN) is_____________________. (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:_________________________________.) I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER 28, 2010 Melissa Ross, MSCE, President Ross Engineering, Inc 17670 NW 78th Street, Ste. 214, Miami, FL 33015 45-0500482 79 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer ✓ market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) ____ Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. ____ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. ____ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: ______________________________________ (Signature) ______________________________________ (Printed Name) ______________________________________ (Title) Sworn to and subscribed before me this ______ day of_______________________, 20_____, by __________________________________________________. (AFFIX NOTARY STAMP HERE) ______________________________________ Signature:1RWDU\3XEOLF±6WDWHRI)ORULGD ______________________________________ Personally Known __________ OR Produced Identification __________ roduced ________________________________10/1998 Melissa Ross, MSCE President 10th August 26 Juan Alonso ✓ 80 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer (48$/23325781,7< $)),50$7,9($&7,21 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax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elissa Ross, MSCE President Ross Engineering, Inc. 17670 NW 78th Street, Ste. 214 Miami, FL 33015 81 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer &21)/,&72),17(5(67 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 &21)/,&72),17(5(6767$7(0(17 The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF ___________________ BEFORE ME, the undersigned authority, personally appeared _____________________________, who was duly sworn, deposes, and states: I am the _________________________________________________ of __________________________________with a local office in _____________________________ and principal office in _____________________. The above named entity is submitting a SURSRVDO for the City of Sunny Isles Beach, Bid No. ______________ described as:5)4&217,18,1*$5&+,7(&785$/$1'(1*,1((5,1*6(59,&(6. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity’s submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. I certify that no member of the entity’s ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. I certify that no member of the entity’s ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. Dated this _________ day of _____________________________________, 20. _________________________________ _________________________________ AFFIANT Print or Type Name and Title Sworn to and subscribed before me this _____ day of ______________________, 20. Personally Known ________ OR Produced Identification ________; Type of Identification _________________________ __________________________________ 127$5<38%/,&67$7(2))/25,'$ DECEMBER 28, 2010 ✓ Miami-Dade Melissa Ross, MSCE PresidentRoss Engineering, Inc.Miami-Dade CountyBroward County 26-07-01 10th August 10th August Melissa Ross, MSCE President 82 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer ✓ ',6387(',6&/2685( City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 ',6387(',6&/2685()250 $QVZHUWKHIROORZLQJTXHVWLRQVE\SODFLQJD³;´DIWHU³<HV´RU³1R´,I\RXDQVZHU³<HV´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elissa Ross, MSCE; President Ross Engineering, Inc.August 10, 2026 ✓ ✓ 83 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer ✓ $17,.,&.%$&. City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax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±6WDWHRI)ORULGD BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 3ULQWRU7\SH&RPPLVVLRQHG1DPH 3HUVRQDOO\.QRZQBBBBBBBBBB253URGXFHG,GHQWLILFDWLRQBBBBBBBBBB 7\SHRI,GHQWLILFDWLRQ3URGXFHGBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB DECEMBER 28, 2010 Miami-Dade Melissa Ross, MSCE President 10th August Juan Alonso 26 Melissa Ross, MSCE President Ross Engineering, Inc. 84 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer CONTRACTOR ANTI-BOYCOTT CERTIFICATION [PURSUANT TO FLORIDA STATUTE §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elissa Ross, MSCE Ross Engineering, Inc. Ross Engineering, Inc. President August 10, 2026 85 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer ✓ E-Verify Affidavit )ORULGD 6WDWXWH GLUHFWV DOO SXEOLF HPSOR\HUV LQFOXGLQJ PXQLFLSDO JRYHUQPHQWV WR YHULI\ WKH HPSOR\PHQWHOLJLELOLW\RIDOOQHZSXEOLFHPSOR\HHVWKURXJKWKH86'HSDUWPHQWRI+RPHODQG6HFXULW\¶V( 9HULI\6\VWHPDQGIXUWKHUSURYLGHVWKDWDSXEOLFHPSOR\HUPD\QRWHQWHULQWRDFRQWUDFWXQOHVVeach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https://www.e-verify.gov/employers/enrolling-in-e-verify) DQG IROORZ WKH LQVWUXFWLRQV7KHFRQWUDFWRUPXVWDVXVXDOUHWDLQWKH,)RUPVIRULQVSHFWLRQ %\DIIL[LQJ\RXUVLJQDWXUHEHORZ\RXKHUHE\DIILUPWKDW\RXZLOOFRPSO\ZLWK(9HULI\UHTXLUHPHQWV &RPSDQ\1DPH 2IIHURU6LJQDWXUH'DWH 3ULQW1DPH7LWOH )HGHUDO(PSOR\HU,GHQWLILFDWLRQ1XPEHU)(,1 Notary Public Information 6ZRUQWRDQGVXEVFULEHGEHIRUHPHRQWKLVWKLV GD\RI %\ ,VSHUVRQDOO\NQRZQWRPH +DVSURGXFHGLGHQWLILFDWLRQW\SHRILGHQWLILFDWLRQSURGXFHG 6LJQDWXUHRI1RWDU\3XEOLF 3ULQWRU6WDPSRI1RWDU\3XEOLF([SLUDWLRQ'DWH PresidentMelissa Ross, MSCE August 10, 2026 Ross Engineering, Inc. 10th August Juan Alonso August 6, 2027 45-05 00482 86 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer ✓ AFFIDAVIT OF COMPLIANCE WITH FOREIGN ENTITY LAWS City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 The undersigned, on behalf of the entity listed below (“Entity”),hereby attests under penalty of perjury as follows: 1. Entity is not owned by the government of a foreign country of concern, as defined in Section 287.138, Florida Statutes. 2. The government of a foreign country of concern does not have a controlling interest in Entity, as defined in Section 287.138, Florida Statutes. 3. Entity is not organized under the laws of a foreign country of concern, as defined in Section 287.138, Florida Statutes. 4. Entity does not have a principal place of business in a foreign country of concern, as defined in Section 287.138, Florida Statutes. 5. The undersigned is authorized to execute this affidavit on behalf of Entity. Date: ____________________, 20___ Signed: Entity: Name: Title: STATE OF COUNTY OF The foregoing instrument was acknowledged before me, by means of տ physical presence or տ online notarization, this ____ day of ______________, 20____, by _______________________________, as ____________________________ for _____________________________________________________, who is personally known to me or who has produced ________________________ as identification. Notary Public Signature: State of Florida at Large (Seal) Print Name: My commission expires: August 10 26 President Melissa Ross, MSCERoss Engineering, Inc. Florida Miami-Dade 10th August 26 Melissa Ross, MSCE President Ross Engineering, Inc. August 6, 2027Juan Alonso 87 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 2 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net TABLE OF CONTENTS TABLE OF CONTENTS PAGE NO. LEGAL ADVERTISEMENT/ NOTICE TO PROPOSER 3 GENERAL TERMS & CONDITIONS 4 SPECIAL TERMS & CONDITIONS 10 SCOPE OF WORK / TECHNICAL SPECIFICATIONS 19 EVALUATION PROCESS 30 PROPOSAL FORMAT 33 BID SUBMITTAL FORM 36 EXHIBIT – EXHIBIT MUST BE REVIEWED BY YOUR FIRM EXHIBIT A – ELECTRONIC SUBMISSION DEMANDSTAR INSTRUCTIONS AFFIDAVITS NON-COLLUSION AFFIDAVIT PUBLIC ENTITY CRIMES EQUAL OPPORTUNITY / AFFIRMATIVE ACTION STATEMENT CONFLICT OF INTEREST STATEMENT DISPUTE DISCLOSURE FORM ANTI-KICKBACK AFFIDAVIT ANTI-BOYCOTT CERTIFICATION E-VERIFY AFFIDAVIT 88 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 3 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net LEGAL ADVERTISEMENT NOTICE TO BIDDER NOTICE IS HEREBY GIVEN that the City of Sunny Isles Beach is seeking sealed Bids for the following work as specified. CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) RFQ No. 26-07-01 The Specifications for this Request for Qualifications are available from DemandStar by calling (800) 711- 1712 or by accessing their website at www.demandstar.com. Proposers who obtain the RFQ Specifications from sources other than DemandStar or the City of Sunny Isles Beach are cautioned that their proposal response package may be incomplete. Sealed PDF proposals will be received by Purchasing and the City Clerk’s office no later than 11:00 AM, on TUESDAY, AUGUST 4, 2026 via DemandStar.com. Proposals received after this time will not be considered. RFQ NO. 26-07-01 DUE DATE AND TIME: TUESDAY, AUGUST 4, 2026 NO LATER THAN 11:00 AM The City reserves the right to reject any or all proposals, with or without cause, to waive technical errors and informalities, and to accept the proposal which best serves the interest of, and represents the best value to, the City in conformity with the criteria set forth in Section 62-8 of the Code of Ordinances of the City of Sunny Isles Beach. Potential and actual proposers shall not solicit or otherwise communicate in any manner whatsoever, directly or indirectly, with the City Commission, City Manager, evaluation committee members, or City staff, other than Procurement Department personnel, regarding this RFQ from the time of the RFQ initial release through the award. A virtual non-mandatory pre-proposal conference is scheduled for Tuesday, July 21, 2026 at 11:00 AM via Zoom at: https://us02web.zoom.us/j/87966801991. All questions regarding this RFQ shall be directed in writing to Purchasing by Friday, August 16, 2026 AT 5:00 PM. Questions must be submitted via email to: Purchasing@sibfl.net. This RFQ is being procured via the requirements set forth in the Consultants’ Competitive Negotiation Act (“CCNA”), Section 287.055, Florida Statutes. Pursuant to Florida Statutes 119.071, sealed bids, proposals or replies by an agency pursuant to a competitive solicitation are exempt from inspection until such time as the agency provides notice of an intended decision or until thirty (30) days after the opening of the bids, proposals, or final replies, whichever is earlier. Mauricio Betancur, CMC, City Clerk City of Sunny Isles Beach 89 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 4 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net SECTION 1 INSTRUCTIONS TO PROPOSER / GENERAL TERMS AND CONDITIONS THESE INSTRUCTIONS ARE STANDARD FOR ALL BID COMMODITIES/SERVICES ISSUED BY THE CITY OF SUNNY ISLES BEACH. THE CITY OF SUNNY I SLES BEACH MAY DELETE, SUPERSEDE OR MODIFY ANY OF THESE STANDARD INSTRUCTIONS FOR A PARTICULAR CONTRACT BY INDICATING SUCH CHANGE I N SPECIAL INSTRUCTIONS TO PROPOSERS OR IN THE BID SHEETS. ANY AND ALL SPECIAL CONDITIONS THAT MAY VARY FROM THE GENERAL CONDITIO0NS SHALL HAVE PRECEDENCE. PROPOSER AGREES THAT THE PROVISIONS INCLUDED WITHIN THIS BID OR RFP SHALL PREVAIL OVER ANY CONFLICTING PROVISION WITHIN ANY STANDARD F ORM CONTRACT OF THE PROPOSER REGARDLESS OF ANY LANGUAGE IN PROPOSER’S CONTRACT TO THE CONTRARY. 1.1 CLARIFICATION/EXPLANATION/QUESTIONS: Any questions concerning the Bid Specifications or any required need for clarification must be addressed to the Procurement Department at Purchasing@sibfl.net by the date mentioned above. Interpretations or clarifications considered necessary by the City will be issued by addenda and posted/disseminated by DemandStar (www.demandstar.com) to all parties listed on the official plan holders’ list as having received the Bid documents. Only questions answered by written addenda shall be binding. Oral interpretations or clarifications shall be without legal effect. No plea of ignorance or delay or required need of additional information shall exempt a Proposer from submitting their Bid on the required date and time as publicly noted. 1.2 PLAN HOLDER’S LIST: As a convenience to Proposers, the City of Sunny Isles Beach has made available via internet lists of all plan holders for each REQUEST FOR PROPOSALS. The information is available on-line at www.demandstar.com or by calling the Office of the City Clerk at (305) 792-1703. 1.3 ADDENDA TO SPECIFICATIONS: If any addenda are issued after the initial specifications are released, the City will post and disseminate the addenda through DemandStar. For those projects with separate plans, blue prints, or other materials that cannot be accessed through the internet, the Office of the City Clerk will make good faith effort to ensure that all registered proposers (those who have been registered as receiving a Bid package) receive the documents. It is the responsibility of the Proposer prior to the submission of any Bid to check the above website or contact the Office of the City Clerk at (305) 792-1703 to verify any addenda issued. The receipt of all addenda must be acknowledged on the Bid Response Sheet. 1.4 SPECIAL ACCOMMODATIONS: Any person requiring a special accommodation at a Pre-Bid Conference or Bid/RFP/RFQ opening because of a disability should call the Office of the City Clerk at (305) 792-1703 at lease five (5) days prior to the Pre-Bid Conference or Bid/RFP/RFQ opening. If you are hearing or speech impaired, please contact the Office of the City Clerk by calling the City of Sunny Isles Beach using the Florida Relay Service which can be reached at 1(800) 955-8771 (TDD). 1.5 PUBLIC ENTITY CRIMES STATEMENT: Pursuant to the provisions of paragraph (2) (a) of section 287.133, Florida statutes "a person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a contract to provide any goods or services to a public entity, may not submit a Bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform work as a Consultant, supplier, sub-Consultant, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in section 287.107, for category two for a period of 36 months from the date of being placed on the convicted vendor list”. 1.6 PROPOSALS DEADLINE: Proposals must be submitted no later than the time and date shown within this document. 1.7 SEALED BID: Submit electronically via DemandStar.com 1.8 BID EXECUTION, SIGNATURES, ERASURE/CORRECTION: All Bids shall be signed in blue ink. All price quotes shall be typewritten or printed with ink. All corrections made by the proposers prior to the opening must be initialed and dated by the proposers. No changes or corrections will be allowed after Bids are opened. Bids must contain an original, manual signature of an authorized representative of the company. 1.9 WITHDRAWAL OF PROPOSALS: Proposers may withdraw Bids only by written request and shall forward the withdrawal request via “Certified U.S. Mail – Return Receipt Requested” prior to the Bid opening time. Negligence on the part of the Proposers in preparing the Bid confers no right for the withdrawal of the Bid after it has been opened. 1.10 BID OPENING: Bids will be opened publicly at the time and place stated in the Notice to Proposer. It is the responsibility of the Proposers to ensure that the proposal is submitted in the City’s Demandstar RFP portal on or before the closing hour and date stated on the REQUEST FOR QUALIFICATIONS. After the RFQ opening, the contents of the Bid Form will be made public for the information of vendors and other interested parties who may be present either in person or by representative. Proposals that are submitted/received after the proposal opening time will not be considered and will not be returned. 1.11 EVALUATION OF PROPOSALS: The City, at its sole discretion, reserves the right to inspect any/all Proposers’ facilities to determine their capability of meeting the requirements for the Contract. Also, price, responsibility, and responsiveness of the Proposers, the financial position, experience, staffing, equipment, materials, references, and past history of service to the City and/or with other units of state, and/or local governments in Florida, or comparable private entities, will be taken into consideration in the Award of the Contract. 1.11.1 Hold Harmless: All Proposer’s shall hold the City, its officials, officers and employees harmless and covenant not to sue the City, it's officials and employees in reference to their decisions to reject, award, or not award a Bid, as applicable. 90 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 5 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net 1.11.2 Cancellation: Failure on the part of the Proposers to comply with the conditions, specifications, requirements, and terms as determined by the City, shall be just cause for cancellation of the Award. 1.11.3 Contract Disputes: If any dispute concerning a question of fact arises under the Contract, other than termination for default or convenience, the Consultant and the City department responsible for the administration of the Contract shall make a good faith effort to resolve the dispute. If the dispute cannot be resolved by agreement, then the department with the advice of the City Attorney shall resolve the dispute and send a written copy of its decision to the Consultant, which shall be binding on both parties. 1.12 CONTRACT: After the Bid award, the City will, at its option, prepare a Contract specifying the terms and conditions resulting from the award of this Bid. The Proposer will have ten (10) calendar days after notification of the award by the City to execute the Contract and provide the required Performance Bond, if any. The Proposers who have the Agreement awarded to them and who fail to execute the Contract and furnish the Performance Bond and Insurance Certificates within the specified time shall forfeit the Bid Security that accompanied their Bid, and the Bid Security shall be retained as liquidated damages by the City, and it is agreed that this sum is a fair estimate of the amount of damages the City will sustain in case the Proposers fails to enter into the Contract and furnish the Bonds as herein before provided. Bid Security deposited in the form of a cashier’s check drawn on a local bank in good standing shall be subject to the same requirements as a Bid Bond. The performance of the City of Sunny Isles Beach of any of its obligations under the Contract shall be subject to and contingent upon the availability of funds lawfully expendable for the purposes of the Contract for the current and any future periods provided for within the Bid specifications. 1.13 PAYMENTS: Payment will be made after commodities/services have been received, accepted, and properly invoiced as indicated in the contract and/or purchase order. Invoices must bear the purchase order number. 1.14 BRAND NAMES: If a brand name, make, of any "or equal" manufacturer trade name, or vendor catalog is mentioned whether or not followed by the words "approved equal" it is for the purpose of establishing a grade or quality of material only. Proposer may offer equals with appropriate identification, samples, and/or specifications on such item(s). The City shall be the sole judge concerning the merits of items Bid as equals. 1.15 MATERIAL: Material(s) delivered to the City under this Bid shall remain the property of the seller until accepted to the satisfaction of the City. In the event materials supplied to City are found to be defective or do not conform to specifications, the City reserves the right to return the product(s) to the seller at the seller’s expense. 1.16 SAMPLES: Samples of items, when required, must be furnished by the Proposers free of charge to the City. Each individual sample must be labeled with the Proposer’s name and manufacturer's brand name and delivered by them within ten (10) calendar days of Proposer’s receipt of the “Notice to Proceed”, unless schedule indicates a different time. If samples are requested subsequent to the Bid opening, they should be delivered within ten (10) calendar days of the request. The City will not be responsible for returning samples. 1.17 QUANTITY GUARANTY: No guaranty or warranty is given or implied by the City as to the total amount that may or may not be purchased from any resulting Contract or Award. These quantities are for Bid purposes only and will be used for tabulation and presentation of the Bid. The City reserves the right to increase or decrease quantities as required, even significantly. The prices offered herein and the percentage rate of discount applies to other representative items not listed in this Bid. 1.18 GOVERNMENTAL RESTRICTIONS ON MATERIALS: In the event any governmental restrictions may be imposed which would necessitate alteration of the material quality, workmanship, or performance of the items offered on this Bid prior to their delivery, it shall be the responsibility of the successful Proposers to notify the City at once, indicating in their letter the specific regulation which required an alteration. The City of Sunny Isles Beach reserves the right to accept any such alteration, including any price adjustments occasioned thereby, or to cancel at no further expense to the City. 1.19 SAFETY STANDARDS: The Proposers warrant that the product(s) supplied to the City conforms in all respects to the standards set forth in the occupational safety and health act (OSHA) and its amendments. Bids must be accompanied by a materials data safety sheet (MSDS) when applicable. 1.20 WARRANTIES: Successful Proposers shall act as agent for the City in the follow- up and compliance of all items under Warranty/Guaranty and complete all forms for Warranty/Guarantee coverage under the Contract. 1.21 COPYRIGHTS/PATENT RIGHTS: Proposers warrant that there has been no violation of copyrights or patent rights in manufacturing, producing or selling of goods shipped or ordered, as a result of this Bid. The Proposer agrees to indemnify City from any and all liability, loss, or expense occasioned by any such violation. 1.22 LOCAL BUSINESS TAX (OCCUPATIONAL LICENSE REGISTRATION): The Proposer shall be responsible for obtaining and maintaining throughout the Contract period his or her city and county local business tax receipts. Each Proposer submitting a Bid on this REQUEST FOR QUALIFICATIONS shall include a copy of the company’s local business tax/occupational license(s) with the Bid response. For information specific to City of Sunny Isles Beach local business tax/occupational licenses, please call Code Enforcement & Licensing at (305) 792-1705. If the Proposer is operating under a fictitious name as defined in Section 865.059, Florida Statutes, proof of current registration with the Florida Secretary of State shall be submitted with the Bid. A business formed by an attorney actively licensed to practice law in this state, by a person actively licensed by the Department of Business and Professional Regulations or the Department of Health for the purpose of practicing his or her licensed profession, or by any corporation, partnership, or other commercial entity that is actively organized or registered with the Department of State shall submit a copy of the current licensing from the appropriate agency and/or proof of current active status with the Division of Corporations of the State of Florida. 91 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 6 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net 1.23 LIABILITY, INSURANCE, PERMITS AND LICENSES: Proposers shall assume the full duty, obligation, and expense of obtaining all necessary licenses, permits, inspections, and insurance required. The Proposers shall be liable for any damages or loss to the City occasioned by negligence of the Proposers (or their agent) or any person the Proposers has designated in the completion of their contract as a result of the Bid. Proposer shall be required to furnish a copy of all licenses, certificates of competency or other licensor requirements necessary to practice their profession as required by Florida State Statute, Miami-Dade County, and City of Sunny Isles Beach Code. Consultants shall include current Miami-Dade County Certificates of Competency. These documents shall be furnished to the City along with the Bid response. Failure to furnish these documents or to have required licensor will be grounds for rejecting the Bid. 1.24 CERTIFICATE(S) OF INSURANCE: Proposers shall furnish to the Office of the City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160, certificate(s) of insurance which indicate that insurance coverage has been obtained from an insurance company authorized to do business in the State of Florida or otherwise secured in a manner satisfactory to the City, for those coverage types and amounts listed in this document, in an amount equal to 100% of the requirements and shall be presented to the City prior to issuance of any Contract(s) or Award(s) Document(s). The City of Sunny Isles Beach shall be named as "additional insured" with respect to this coverage by the awarded Firm. The required certificates of insurance shall not only name the types of policies provided, At the time of Bid submission the Proposers must submit Proof of Insurance as outlined in the General Conditions section. All required insurances shall name the City of Sunny Isles Beach as additional insured and such insurance shall be issued by companies authorized to issue insurance in the State of Florida. It shall be the responsibility of the Proposers and insurer to notify the City Manager of the City of Sunny Isles Beach of cancellation, lapse, or material modification of any insurance policies insuring the Proposers, which relate to the activities of such vendor and the City of Sunny Isles Beach. Such notification shall be in writing, and shall be submitted to the City Finance Director thirty (30) days prior to cancellation of such policies. This requirement shall be reflected on the certificate of insurance. Failure to fully and satisfactorily comply with the city's insurance and bonding requirements set forth herein will authorize the City Manager to implement a rescission of the Bid award without further City Commission action. The Proposer hereby holds the City harmless and agrees to indemnify City and covenants not to sue the City by virtue of such rescission. 1.25 ASSIGNMENT: The Proposer shall not transfer or assign the performance required by this Bid without prior written consent of the City Manager. Any award issued pursuant to the REQUEST FOR QUALIFICATIONS and monies which may be due hereunder are not assignable except with prior written approval of the City Manager. Further, in the event that the majority ownership or control of the Proposer changes hands subsequent to the award of ththe Contract, Proposer shall promptly notify City in writing (via United States Postal Service – Certified Mail, Return Receipt Requested) of such change in ownership or control at least thirty (30) days prior to such change and City shall have the right to terminate the Contract upon sixty (60) days written notice, at City’s sole discretion. 1.26 HOLD HARMLESS/INDEMNIFICATION: The Proposer shall indemnify, hold harmless, and defend the City of Sunny Isles Beach, it's officers, officials, agents, and employees from and against any claims, demands or causes of action of whatsoever kind or nature arising out of error, omission, negligent act, conduct, or misconduct of theProposer, its agents, servants or employees in the provision of goods or the performance of services pursuant to this Bid and / or from any procurement decision of the City including without limitation, awarding the Contract to the Proposer. 1.27 NON-CONFORMANCE TO CONTRACT: The City of Sunny Isles Beach may withhold acceptance of, or reject items which are found upon examination, not to meet the specification requirements. Upon written notification of rejection, items shall be removed within (5) calendar days by the Proposer at its own expense and redelivered at its expense. Rejected goods left longer than thirty (30) calendar days will be regarded as abandoned and the City shall have the right to dispose of them as its own property. Rejection for non - conformance or failure to meet delivery schedules may result in the Proposer being found in default. 1.28 DEFAULT PROVISION: In case of default by the Proposer, the City of Sunny Isles Beach may procure the articles or services from other sources and hold the Proposer responsible for any excess costs occasioned or incurred thereby. 1.29 SECONDARY/OTHER VENDORS: The City reserves the right in the event the primary Proposer cannot provide an item(s) or service(s) in a timely manner as requested, to seek other sources without violating the intent of the Contract. 1.30 DEFINITIONS: Wherever used in these General Conditions or in the other Contract/Contract Documents, the following terms shall have the meaning indicated which shall be applicable to both the singular and plural thereof: Acceptance: Acceptance by the City of the Work as being fully complete in accordance with the Contract/Contract Documents subject to waiver of claims. Contract: The written Contract (between the City and the Proposer covering the Work to be performed, and the terms and conditions, which includes the Contract Documents. Addenda: Written or graphic instruments issued prior to the Bid Opening which modify or interpret the Contract Documents, Drawings and Specifications, by addition, deletions, clarifications or corrections. Approved: Means approved by the City. Bid or Proposal: The offer of the Proposers submitted on the prescribed form setting forth the prices for the Work to be performed. Proposers: Any person, firm or corporation submitting a Bid for Work. As used herein, “Firm”, “Proposing Firm”, “Vendor,” “Contractor,” and “Bidder” shall have the same meaning as “Proposers”. In any resultant Contract, the Proposer as defined herein, shall mean the Contractor. Bonds: Bid, performance bond and other instruments of security, furnished by 92 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 7 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net the Proposer and its surety in accordance with the Contract Documents and in accordance with the law of the State of Florida. Change Order: A written order to the Consultant signed by the City authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time issued after execution of the Contract. City: City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160. Contract Documents: Contract Documents shall include, Instructions to Proposers, Contractor's Bid, the Bonds, the Notice of Award, the Contract between the City and Consultant as well as any addenda thereto, these General Conditions, Special Conditions, the Technical Specifications, Drawings and Modifications, Notice to Proceed, REQUEST FOR QUALIFICATIONS, Insurance Certificates, Change Orders and Acknowledgment of Conformance with the City of Sunny Isles Beach. Contract Price: The total monies payable to the Consultant under the Contract Documents. Contract Time: The initial term and renewal terms, if any, of the resultant Contract. Contracting Officer: The individual who is authorized to sign the Contract Documents on behalf of the City’s governing body. Consultant: The person, firm or corporation with whom the City has executed a Contract. Day: A calendar day of twenty-four hours measured from midnight to the next midnight. Field Order: A written order issued by the City which clarifies or interprets the Contract Documents or orders minor changes in the Work. Modification: Modification means any one of the following: (a) a written amendment of the Contract Documents signed by both parties, (b) a Change Order, (c) a written clarification or interpretation if issued by the City, or (d) a written order for minor change or alteration in the Work issued by the City. A modification may only be issued after execution of the Contract. Notice of Award: The written notice by City to the apparent successful Proposers stating that upon compliance with the conditions precedent to be fulfilled by him within the time specified, City will execute and deliver the Contract to it. Samples: Physical examples which illustrate materials, equipment or workmanship and establish standards by which the Work will be judged. Specifications: Those portions of the Contract Documents consisting of written technical descriptions of materials, equipment, construction systems, standards and workmanship as applied to the Work. Statement of Services: The form furnished by the City which is to be used by the Consultant in requesting progress payments. Supplier: Any person or organization who supplies materials or equipment for the Work, including that fabricated to a special design, but who does not perform labor at the site. Work: Any and all obligations, duties and responsibilities necessary to the successful completion of the Work under the Contract Documents, including all Improvements, build-out obligations, labor, materials, equipment and other incidentals, and the furnishing thereof. Written Notice: The term “Notice” as used herein shall mean and include all written notices, demands, instructions, claims, approvals and disapprovals required to obtain compliance with Contract requirements. Written notice shall be deemed to have been duly served if delivered in person to the individual or to a member of the Consultant or to an officer of the corporation for whom it is intended, or to an authorized representative or such individual, firm, or corporation, or if delivered at or sent by registered mail to the last business address known to them who gives the notice. Unless otherwise stated in writing, any notice to or demand upon the City under the Contract shall be delivered to the City. 1.31 PROPOSAL AWARD: The City reserves the right to reject any and all proposals at its sole discretion. Proposals shall be awarded by the City after the City performs all necessary searches, inquiries, exploration, and analysis of the Bids. The RFQ shall be awarded a pre-qualified contract to the highest ranked responsive and responsible Proposer(s) whose Bid best serves the interests of and represents the best value to the City. No Notice of Award will be given until the City has concluded any investigation(s) as they deem necessary to establish the Proposer’s capability to perform the Services as described in this RFP, ITB, RFQ or ITQ, as substantiated by the required professional experience, client references, technical knowledge and qualifications; and sufficient labor and equipment to comply with the City’s established standards, as well as the financial capability of the Proposer to perform the Work in accordance with the Contract Documents to the satisfaction of the City within the time prescribed. The City reserves the right to reject the Bid of any Proposers on the basis of these queries and investigations and who does not meet the City’s satisfaction, even though the Proposer may be the lowest dollars and cents Bid. In analyzing Bids, the City will also take into consideration client references, past work experience and work product, and proven ability to satisfactorily perform. If the Contract is awarded, the City will 93 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 8 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net issue the Notice of Award and give the successful Proposers a Contract for execution within ninety (90) days after opening of Bids. The City specifically reserves the right to award the Contract to a proposer who is not necessarily the lowest dollars and cents proposer on the basis of the results of these queries and investigation(s). 1.32 EXECUTION OF CONTRACT: The Contract, the Performance Bond, the Certificates of Insurance, and such other Documents as required by the Contract Documents shall be executed and delivered by Consultant to the City within ten (10) calendar days of receipt of the Notice of Award. 1.33 LAWS AND REGULATIONS: The Consultant will give all notices and comply with all laws, ordinances, rules and regulations applicable to the Work. If the Consultant observes that the Specifications are at variance therewith, they will give the City prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate modification. If the Consultant performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and without such notice to the City, Consultant will bear all costs arising wherefrom. 1.34 TAXES: The City of Sunny Isles Beach is exempt from sales tax imposed by the State and/or Federal Government. Florida Sales Tax Exemption No. 23-00-477131-54C appears on each purchase order. Exemption certificates are available upon request. 1.35 DUTY TO DEFEND, INDEMNIFY AND SAVE HARMLESS: In consideration of the separate sum of twenty-five dollars ($25.00) and other valuable consideration, the Consultant shall defend, indemnify and hold harmless the City, its officials, officers, agents and employees, from or on account of any injuries or damages, received or sustained by any person or persons during or on account of any operations connected with the Work described in the Contract Documents, or by or in consequence of any negligence in connection with the same; or by use of any improper materials or by or on account of any act or omission of the said Consultant or his Sub-Consultant, agents, servants or employees. The Consultant will defend, indemnify and hold harmless the City and their agents or employees from and against all claims, damages, losses and expenses including attorneys' fees arising out of or resulting from the performance of the Work, provided that any such claim damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property including the loss of use resulting wherefrom and (b) is caused in whole or in part by any negligent act or omission of the Consultant, Sub-Consultant, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused by a party indemnified hereunder. In the event that a court of competent jurisdiction determines that Sec. 725.06 (2), F.S. is applicable to this Work, then in lieu of the above provisions of this section the parties agree that Consultant shall indemnify, defend and hold harmless the City, their officers and employees, to the fullest extent authorized by Sec. 725.06 (2) F.S., which statutory provisions shall be deemed to be incorporated herein by reference as if fully set forth herein. In the event that any action or proceeding is brought against City, or its officials, officers, or employees,by reason of any such claim or demand, Consultant, upon written notice from City shall defend such action or proceeding by counsel satisfactory to City. The indemnification provided above shall obligate Consultant to defend at its own expense or to provide for such defense, at City’s option, any and all claims of liability and all suits and actions of every name and description that may be brought against City, excluding only those which allege that the injuries arose out of the sole negligence of City, which may result from the operations and activities under Contract whether the Work be performed by Consultant, its Sub- Consultants, or by anyone directly or indirectly employed by either. 1.36 DECISIONS ON DISAGREEMENTS: The City will be the initial interpreter of the Technical Specifications. 1.37 CITY MAY TERMINATE: If the Consultant is adjudged bankrupt or insolvent, or if they make a general assignment for the benefit of their creditors, or if a trustee or receiver is appointed for the Consultant or for any of their property, or if they file a petition to take advantage of any debtor’s act, or to reorganize under bankruptcy or similar laws, or if they repeatedly fails to supply sufficient skilled workmen or suitable materials or equipment, or if they repeatedly fail to make prompt payments to Sub-Consultants or for labor, materials or equipment or they disregard laws, ordinances, rules, regulations or orders of any public body having jurisdiction, or if they disregard the authority of the City, of if they otherwise violate any provision of, the Contract Documents, then the City may, without prejudice to any other right or remedy and after giving the Consultant and the surety ten (10) days written notice, terminate the services of the Consultant and take possession of the Project and of all materials, equipment, tools, construction equipment and machinery thereon owned by the Consultant, and finish the Work by whatever method they may deem expedient. In such case the Consultant shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds the direct and indirect costs of completing the Project, including compensation for additional professional services, such excess shall be paid to the Consultant. If such costs exceed such unpaid balance, the Consultant will pay the difference to the City. Such costs incurred by the City will be determined by the City and incorporated in a Change Order. If after termination of the Consultant under this Section, it is determined by a court of competent jurisdiction for any reason that the Consultant was not in default, the rights and obligations of the City and the Consultant shall be the same as if the termination had been issued pursuant to this document. 1.37.1 Where the Consultant’s services have been so terminated by the City said termination shall not affect any rights of the City against the Consultant then existing or which may thereafter accrue. Any retention or payment of monies by the City due the Consultant will not release the Consultant from liability. 1.37.2 Upon ten (10) days written notice to the Consultant, the City may, without cause (termination for convenience) and without prejudice to any other right or remedy, elect to terminate the Contract. In such case, the Consultant shall be paid for all Work executed and accepted by the City as of the date of the termination. No payment shall be made for profit for Work which has not been performed. 1.38 MISCELLANEOUS: Proposers acknowledge the following miscellaneous conditions: 1.38.1 Whenever any provision of the Contract Documents requires the giving of written notice it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to them who gives the notice. 94 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer 9 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net 1.38.2 The ContractDocuments shall remain the property of the City. The Consultant shall have the right to keep one record set of the Contract Documents upon completion of the Project. 1.38.3 The duties and obligations imposed by these General Conditions, Special Conditions and Supplemental Conditions and the rights and remedies available hereunder, and, in particular but without limitation, the warranties, guarantees and obligations imposed upon Consultant and those in the Special Conditions and the rights and remedies available to the City, shall be in addition to, and shall not be construed in any way as a limitation of, any rights and remedies available by law, by special guarantee or by other provisions of the Contract Documents. 1.38.4 Should the City or the Consultant suffer injury or damage to its person or property because of any error, omission, or act of the other or of any of their employees or agents or others for whose acts they are legally liable, claim shall be made in writing to the other party within a reasonable time of the first observance of such in jury or damage. 1.39 WAIVER OF JURY TRIAL: City and Consultant knowingly, irrevocably voluntarily and intentionally waive any right either may have to a trial by jury in State or Federal Court proceedings in respect to any action, proceeding, lawsuit or counterclaim based upon the Contract Documents or the performance of the Work there under. 1.40 GOVERNING LAW: The Contract shall be construed in accordance with and governed by the law of the State of Florida. 1.41 VENUE: Venue of any action to enforce the Contract Documents shall be in Miami-Dade County, Florida. 1.43 PROJECT RECORDS: City shall have right to inspect and copy during regular business hours at City’s expense, the books and records and accounts of Consultant which relate in any way to the Project, and to any claim for additional compensation made by Consultant, and to conduct an audit of the financial and accounting records of Consultant which relate to the Project. Consultant shall retain and make available to City all such books and records and accounts, financial or otherwise, which relate to the Project and to any claim for a period of three years following final completion of the Project. During the Project and the three year period following final completion of the Project, Consultant shall provide City access to its books and records upon five days written notice. 1.44 SEVERABILITY: If any provision of the Contract or the application thereof to any person or situation shall to any extent, be held invalid or unenforceable, the remainder of the Contract, and the application of such provisions to persons or situations other than those as to which it shall have been held invalid or unenforceable shall not be affected thereby, and shall continue in full force and effect, and be enforced to the fullest exten t permitted by law. 1.45 INDEPENDENT CONTRACTOR: The Consultant is an independent Contractor under the Contract. Services provided by the Consultant shall be by employees of the Consultant and subject to supervision by the Consultant, and not as officers, employees, or agents of the City. Personnel policies, tax responsibilities, social security and health insurance, employee benefits, purchasing policies and other similar administrative procedures, applicable to services rendered under the Contract shall be those of the Consultant. 1.46 PROHIBITION AGAINST CONTRACTING WITH SCRUTINIZED COMPANIES: Pursuant to Florida Statutes Section 287.135, and subject to limited exceptions contained therein, a company is ineligible to, and may not, bid on, submit a proposal for, or enter into or renew a contract with an agency or local governmental entity for goods or services if at the time of bidding, submitting a proposal for, or entering into or renewing a contract, the company is on the Scrutinized Companies that Boycott Israel List or is engaged in the boycott of Israel. Consultants must certify that the company is not participating in a boycott of Israel. Any contract for goods or services of One Million Dollars ($1,000,000) or more shall be terminated at the City’s option if it is discovered that the company submitted a false certification, or at the time of bidding, submitting a proposal for, or entering into or renewing a contract, is listed on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Terrorism Sectors List, created pursuant to Florida Statute Section 215.473, or is or has been engaged in business operations in Cuba or Syria, after July 1, 2018. Any contract entered into or renewed after July 1, 2018 shall be terminated at the City’s option if the company is listed on the Scrutinized Companies that Boycott Israel List or engaged in the boycott of Israel. Consultants must submit the certification that is attached to the Contract. Submitting a false certification shall be deemed a material breach of contract. The City shall provide notice, in writing, to the Consultant of the City’s determination concerning the false certification. The Consultant shall have ninety (90) days following receipt of the notice to respond in writing and demonstrate that the determination was in error. If the Consultant does not demonstrate that the City’s determination of false certification was made in error, then the City shall have the right to terminate the contract and seek civil remedies pursuant to Florida Statute Section 215.4725. 1.47 Prohibition Against Considering Social, Political or Ideological Interests in Government Contracting Proposers are hereby notified of the provisions of section 287.05701, Florida Statutes, as amended, that the City will not request documentation of or consider a Proposer’s social, political, or ideological interests when determining if the Proposer is a responsible Proposer. Proposers are further notified that the City's governing body may not give preference to a Proposer based on the Proposer's social, political, or ideological interests. 1.48 Compliance with Anti-Human Trafficking Laws Consultant must submit the Affidavit that is attached to the Contract certifying that it does not use coercion for labor or services as defined in Section 787.06, Florida Statutes. (Source: § 787.06 (13), Florida Statutes – Human Trafficking). Submitting a false certification shall be deemed a material breach of contract. End of Section 95 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 10 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net Section 2 Special Terms and Conditions 2.1 PURPOSE OF REQUEST FOR QUALIFICATIONS: The City of Sunny Isles Beach, Florida, (the “City”) a municipality located in Miami-Dade County, Florida, seeks to secure qualified and experienced Professional Consulting firms (the “firm” and/or “Consultant”) to submit statements of qualifications to provide Continuing Professional Services as required under a continuing services contract for the following disciplines: • Architects • Landscape Architects • General Civil Engineers • Electrical Engineers • Surveyors and Mapping • Environmental/ Coastal Engineering • Transportation/ Transit / Traffic Engineering • Construction Engineering & Inspection Services (CEI) Consultant may seek to be qualified and selected for one (1) or more discipline category. The City will evaluate and rank Consultants for each type of discipline. The City reserves the right to award fewer or more contracts for each Type of Work Category, in the best interest of the City. The City does not guarantee to interested consultants that they will receive work if awarded a continuing contract for consulting services. Professional services awarded through this RFQ will be for projects that do not exceed $7.5 million in basic construction cost and for study activity if the fee for professional services for each individual study does not exceed $500,000 , as amended. Any professional services awarded through this RFQ will be for Projects not intended to exceed the thresholds set in Florida State Statute 287.055. The City, on an as needed basis, will periodically issue specific projects and assignments to the retained Consultant(s). The selected Consultant(s) shall demonstrate specific experience and capabilities and must have personnel qualified through education and experience in the specified discipline(s). The qualifications and selection of consultants shall be in accordance with Florida Statutes Section 287.055. The awarded consultants must be currently licensed to practice in the State of Florida, as required by law. THE SERVICES TO BE PROVIDED ARE AS FOLLOWS: a. Study Activities shall mean professional services involving research, investigation and/or evaluation which result in the presentation of findings, recommendations and/or general plan for resolving problems or needs, however, it will not involve the preparation of specific project designs, plans, specifications or other documents that would be used in obtaining price proposals or awarding construction Contracts. 96 City of Sunny Isles Beach | RFQ 26-07-01 Continuing Professional Architectural and Engineering | General Civil Engineer RFQ # 26-07-01 CONTINUING PROFESSIONAL ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES (CCNA) Page 11 CITY OF SUNNY ISLES BEACH 18070 Collins Ave. | Sunny Isles Beach, FL 33160 305.792.1707 | sibfl.net | Purchasing@sibfl.net b. Continuing Contracts shall mean a contract for professional services for Projects for which construction Contracts will not exceed the thresholds set in Florida State Statute 287.055 (2) (g) or for work of a specified nature as outlined in the Contract with the City. 2.2 NON-MANDATORY PRE-PROPOSAL CONFERENCE: A virtual non-mandatory pre-proposal conference will be held on TUESDAY, JULY 21, 2026 at 11:00 AM to discuss the special conditions and specifications included within this solicitation. No questions that will change the Scope of this RFQ will be answered during the pre-proposal conference. Consultants have until the deadline indicated on page 1 to submit questions. Oral statements may not be relied upon and will not be binding or legally effective. As such an addendum will be issued if any alterations are made to the specifications contained herein. Zoom Hyperlink: https://us02web.zoom.us/j/87966801991 2.3 CONTRACT TERM The City expects to award multiple Contracts as a result of this RFQ. The Contract will commence upon execution by both parties which shall be the effective date succeeding approval of the Contract by the City Commission. The Contract term shall be for five (5) years. 2.3.1 CONTRACT EXTENSION In the event services are scheduled to end because of the expiration of the Contract, the Consultant shall continue the service upon the request of the City Manager, solely for the purpose and to the extent necessary to complete any unfinished tasks. Task orders issued during the Contract term and not completed within that time five (5) year period shall be completed by the Consultant within the time specified in the task order. Each Task Order may provide that the successful Consultant(s) is to achieve final completion within an agreed time period determined and agreed upon by both parties from the date appearing in the Notice to Proceed form for the specified Project. Therefore, the Consultant agrees to begin each Project in conformity with the provisions set forth in the Task Order and to perform it with all due diligence, so as to complete the entire work and Project by the time limits set forth in the agreed Project Schedule for the specified Project. As to such a Task Order that has deadlines, time will be of the essence unless stated otherwise. The Consultant shall be compensated for the service at the rate in effect when this extension clause is invoked by the City. Upon ten (10) Calendar Days written notice to Consultant, City may, without cause and without prejudice to any other right or remedy, terminate the Contract for City’s convenience whenever City determines. Where the Contract is terminated for the convenience of City, the notice of termination to Consultant must state that the Contract is being terminated for the convenience of City, the effective date of the termination and the extent of termination. Services will be paid for through date of termination, and this shall mean payment for all completed tasks and payment for uncompleted tasks based upon the percentage of completion of such uncompleted tasks. Consultant shall not be 97 7. No Contingent Fees 98 Ross Engineering, Inc. |3325 S University Drive, Suite 111, Davie, FL |954-318-0624 17670 NW 78th Ave., Ste 214, Miami, FL 33015 | P: 786.468.8304 | F: 305.392-1019 | www.rossengineers.com July 17 , 2026 City of Sunny Isles Beach Procurement Department 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: RFQ No. 26-07-01 – Continuing Professional Architectural and Engineering Consulting Services (CCNA) Discipline 3 – General Civil Engineers No Contingent Fees Ross Engineering, Inc. hereby warrants that it has not employed or retained any company or person, other than a bona fide employee working solely for Ross Engineering, Inc., to solicit or secure this Contract. Ross Engineering, Inc. further warrants that it has not paid or agreed to pay any person, company, corporation, individual, or firm, other than a bona fide employee working solely for Ross Engineering, Inc., any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or execution of this Contract. By executing this statement and submitting its Proposal, Ross Engineering, Inc. certifies its compliance with Section 287.055(6)(a), Florida Statutes, regarding contingent fees. ROSS ENGINEERING, INC. By: ____________________________________ Melissa Ross, MSCE President Date: July 17, 2026 Notary Acknowledgment STATE OF FLORIDA COUNTY OF MIAMI-DADE The foregoing instrument was acknowledged before me by means of X physical presence or online notarization this 17TH day of JULY , 2026, by Melissa Ross, as President of Ross Engineering, Inc., who is X personally known to me or has produced ______________________________ as identification. Notary Public Signature: __________________________________ Printed Name: JUAN J. ALONSO Commission No.: HH 430096 My Commission Expires: AUGUST 6, 2027 Notary Seal 99 8. Exceptions 100 Ross Engineering, Inc. |3325 S University Drive, Suite 111, Davie, FL |954-318-0624 17670 NW 78th Ave., Ste 214, Miami, FL 33015 | P: 786.468.8304 | F: 305.392-1019 | www.rossengineers.com July 17 , 2026 City of Sunny Isles Beach Procurement Department 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: RFQ No. 26-07-01 – Continuing Professional Architectural and Engineering Consulting Services (CCNA) Discipline 3 – General Civil Engineers Exceptions Ross Engineering, Inc. takes no exceptions to the terms, conditions, requirements, or provisions of RFQ No. 26-07-01. Ross Engineering, Inc. acknowledges and agrees to comply with all requirements of the solicitation and any issued addenda. ROSS ENGINEERING, INC. By: ____________________________________ Melissa Ross, MSCE President