Loading...
HomeMy WebLinkAboutSol-ARCH/0 ` U NY IS4, �s * * FLOC n 2 Architectural Design Services for a New Facility at 18080 Collins Ave Applicant Firm: Contact Person: Contact Info: Address: Phone Number: Submittal Due: Sol -ARCH RFP No. 15 -04 -01 ARCHITECTURE Sol -ARCH, Inc. Dulce Conde d @sol- arch.com 4917 SW 74" CT Miami, FL 33155 305 - 740 -0723 June 2, 2015 — 2:00 PM ► wv:w.sol arch.com RFQ No. 15 -04 -01 Sol -ARCH Cover Letter and Executive Summary Sol -ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 C. SOL -ARCH COVER LETTER AND EXECUTIVE SUMMARY Sol -ARCH is pleased to submit its proposal for the City of Sunny Isles Beach Architectural Design Services for a New Facility RFQ No. 15- 04 -01. We are presenting an extremely highly qualified firm committed to delivering exceptional results for this project. Sol -ARCH is a small South Florida based multi - disciplinary architecture firm of global capacity that has been active for 9 years. Our expertise lies with providing our clients with a turn -key, one -stop shop experience. We provide due diligence, feasibility, master planning, programming, architecture, interiors, sustainable design, construction management, renderings, animations, and scale model services. Dulce Conde is the female owner and registered architect of the firm. Primitivo Conde is the designer /project architect. Michael Figueredo is the company's project manager. Under their direction are technical staff members all qualified to perform production drawings and visualization. Our projects cover a wide range of markets including planning, residential, commercial, retail, hospitality, and mixed -use. As the Prime Respondent, Sol -ARCH will be responsible for overseeing the team and providing local knowledge of the area, planning, building codes and municipal guidelines, and requirements. Sol -ARCH will lead the team in developing a strong working relationship with the Client by providing timely information, analysis, and detail as the project evolves. Our team, throughout the assessment process, will use their expertise and skills to provide a product to the Client that has a clear Vision and demonstrates innovation while maintaining a maximum rate of return for the project. Sol -ARCH acknowledges the City of Sunny Isles Beach's contract agreement requirements as described in the Scope of Services of RFQ No. 15- 04 -01. We will obey all rules, commitments, regulations and standards set forth by the City of Sunny Isles Beach and acknowledge that there are no possible conflicts of interest for the specified work. Thank you for the opportunity to present this proposal to you. If you have any comments or concerns about this proposal, please do not hesitate to contact me at your convenience. Michael Figueredo, Principal Sol -ARCH, Inc. 4917 SW 74th CT Miami, Florida 33155 0:(305)740 -0723 Sol -ARCH ►www.sol- arch.com RFQ No. 15 -04 -01 Sol -ARCH Approach and Understanding Sol -ARCH ► www.soi- orch.com RFQ No. 15 -04 -01 D. SOL- ARCH'S APPROACH TO MANAGEMENT Sol -ARCH prides itself with the company's philosophy of being problem SOL -vers and SOL -ution providers. This has earned Sol -ARCH a reputation of client commitment and satisfaction. Sol- ARCH's approach to projects is one of listening to our clients needs and performing their mission on time and in budget. From programming our client's ideas to construction administration of the final product Sol -ARCH will be there to efficiently deliver the complete package of services. Sol -ARCH will perform the below mentioned scope of services as required for the awarded projects. See phasing schedule below. (Actual time in weeks or months will be determined upon issuance of a project.) Phase One: Space planning analysis Phase Two: Schematic Design (SD) Phase Three: Design Development (DD) Phase Four: Construction Documents (CD) Phase Five: Bidding and Permitting Phase Six: Construction Administration (CA) Sol -ARCH ► www.sokarch.com RFQ Na 15 -04 -01 PHASE ONE: SPACE PLANNING ANALYSIS We will provide a space need assessment for the entire facility. Sol -ARCH will meet with the department directions in order to identify the specific needs and formulate this into a final space plan analysis. In addition the space analysis plan will include future expansion alternatives. (Actual time in weeks or months will be determined upon issuance of a project.) 3PPENDLY E - PRELIMINARY SPACE PUN ANALI -Mi 411W_DMYlnmi waraM SIMI 6knaIM641xrt c"mOpr Pedp4 Fmm T4 [4n.1tMt'POpmNP4e 1411,00 t `IYP a .. Ma 9 MM .dsayl � WflplYl[i 1, r k f.lN. rttw.lpflp Ml4kW3(8 BMWnPd Pomubn9 I: .r .. r. k 9 - k.':WJWN.t «!rcnre«m.mhF.rox aee � r aurae. rm w.r.e! nrle ar.q'rs� 6yangbr" wtval e � . ame Mang iVYtK _ N [ k lWO)` rcY RJW *�Wfl 1 i1 4 .MMYHI.MID%M 7I+M7n.102r,= mxy a tc SP w.ta a ­71717 _rcttro .+a+tge.r+ptrm[w..n axe calb A611114" I i MY.YW aVW. M1riM __p[4 amyl , o mnamne.. xms Rr415p Mqf � . a mm wa MK.MoRth .tl Mr MBai I�P/ Liy115f1Afd3 in .1° -"1i%Y kiYr)HO'CifLWM11fYY { tlyity 2 f`�111}yn 1, Mr ---mmy IMMVDMM 4M t MK.e uag4u rc NIP14HW W00 r 14 4nK41kkrce FdMrm 4 as T wi, L' IM SF rr9M7M=ft. nT ;tom I NAT SF 1 2.M Sr Sol -ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 PHASE TWO: SCHEMATIC DESIGN ISD) We will organize all your requirements during the Schematic Design phase, by using the established Program for your project; drawings will include master site plan development, site plan, plans and elevations. We will also perform a Code Analysis and establish your specific zoning and other restrictions. Based on the Program and Code Analysis, we will prepare preliminary design sketches of a site plan, floor plans, and elevations. We will prepare an Outline Specification; a list describing the proposed products and materials to be used on the project, and depending on the size and complexity of the project, we may prepare multiple schemes and discuss with you the benefits and /or drawbacks of each. Our goal during this phase is to acquire a complete and accurate understanding of your intentions and project requirements. To be certain that we clearly communicate our ideas to you, we will use several different presentation methods such as 3D renderings and /or models. Upon completion of the Schematic Design phase, we will prepare a preliminary cost estimate for each potential scheme for your use. In addition a preliminary construction budget will be presented. (Actual time in weeks or months will be determined upon issuance of a project.) Sketches White Plaster Massing Models Renderings Sol -ARCH ► www.sol-arch.com RFQ No. 15 -04 -01 PHASE THREE: DESIGN DEVELOPMENT (DD) All of the major decisions for the project will be made during Design Development. The sketches prepared during Schematic Design will be thoroughly detailed and developed into a complete set of design drawings. All the building materials, fixtures and finishes will be selected. A code review will be performed to confirm that the project meets with the limits and requirements established by any and all regulatory agencies. When Phase Three is complete, the project will be fully developed and you will be asked to approve the Design Development package and authorize us to proceed to the next step, preparing the Construction Documents. Project schedule will be provided. (Actual time in weeks or months will be determined upon issuance of a project.) FGL'r it { /L !J'P� �hGCal,� EDU ATIOIN *� P FLORIDA BUILDING CODE ®n Ii n4 Su"s Ili rie NFPA Sol -ARCH ►www.sol-arch.com RFQ No. 15 -04 -01 PHASE FOUR: CONSTRUCTION DOCUMENTS (CD) With the design fully developed, all the required technical information, such as dimensions and notes, will be added to the drawings. A Project Manual will be developed, which will include a final Specification document (a detailed description of every material and product used on the job) and various material lists (door schedule, window schedule, finish schedule, etc.). Combined, the Construction Drawings and the Project Manual become the legal documents from which a General Contractor will confirm budget and ultimately construct your building. We will also prepare an Application for Building Permit at this time and submit the completed set of Construction Documents to the Building Department for their comments and approval. (Actual time in weeks or months will be determined upon issuance of a project.) ��� 300��iOW6��3r'7r !� AI rr.ti min 11■ - 'LIN Sol -ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 Now UlAraw�rnnpi NEW crnx irdin ITI A Once you approve the work completed in Phase Five, we will prepare a comprehensive Bid Package. This package includes a complete set of Construction Documents (Construction Drawings and Project Manual) and the Bid Requirements (instructions, due date, etc.). We will issue a package to each selected bidder. We will collect the bids on the scheduled due date and carefully review each one with you. If negotiations are required during the bidding process, we will assist you as necessary. In addition Sol -ARCH will permit the project. (Actual time in weeks or months will be determined upon issuance of a project.) 1Siaral lLar sen Inc C .Vwa � apW a>® GRO;SSF AC1MG11 HST 9@ 1IEt1 OESCRIPIION QUAWMY UW UNR COST suO 33F YAr f Site Wwk 5 Paeka e 1 plsaraE B YIXIH ; 18pIpID ; 1 @SID S 7831 i Som 2 5 M31t 1 IS 3 11 ID dW Tm 3 ®m g S 1ID S 3ID S 3ID 1 15J / 11W SF 3 53R 3 4333 i T9f S 830 3 /lei 1 IS 1 1 31 p.2o e as n I Sr lam ; $ s T Ilar rortshralre 8351 SF 3ID 3 m 2M ; i4 a St Fenx 1 L& 5 ID 331.11111M 1 p a w.ai. 1 L3 z9a0m s a R 1 a al 19 flare _Sb di m SIG! tIDpm f 07 J, 1 in i mat ++ Ra1 a apom 7_11 12 Sbre7wrt 114 Sf gam f 55AIYID S tom ; toai 13 bars 4 i 1 5 192 a 191 11 EtleierPia 190 SF F 3 tm a 4Smm ; LL7a 3 15 OTAL BUDGET I 13 lal f:ROm ; 19yIDID i 11T ; Tn 1T3 16 t1aAC 15 TN 3 2"D" ID 19T 513 17 F .I- M5T 3 tom a 1N3TaID S pID 3 1t.TT Fk. ; 1 ria UAW "b aF 3 75m 3 17 2191 20 39rr aF 3 fom 1 R791m 131 1AU 22 pwb falls as Sf 3 tom 1 E31fOID 131 tm 22 1111 S 3 s M zs EA s s s SrrL tnlal 7 TT19NID S 14531 ; M1.1a amwe . - k B Owner Buildi P.d Owner GLS WCIrta.an.R re 2% ; 7i19a S 7.51 ; ON ptoiit t0.0% ; TRA"M S 4. S 1581 TOTAL BUOGET l0ID 11iK ITEM TQ_E QUA UNIT UNITCOST BUOGEI V6ROSS SF Site Wwk 5 Paeka e 1 plsaraE 63851 g 3 OZ5 3 m 5 iL S 181 2 Fill 6iA91 W OID 11 ID dW Tm 3 IS 7 10)MM 3 111MIM Im 7 191 ■ e 11 S i fID 3 3FygNID 3 a@ 3 1011 5 Gm W 3 tom x 41 m 31 MR, ®o Sr S Im 1 1IMM S 191 1 I" 7 6589 F i 1� i iB R i ti9? i IN@ 8 St Fenx 190 LF 331.11111M SM a 6.0 Sub -total 3 ID mm 71 -M pv0�'s Risk B Owner aviMin Permit B Orner GL6 WClnsvnnce fteca Wre i 1 1 a 1.0 ON 6 Pmta 10.9% i 1 14 3 M.O S 11St ; 732 OTAL BUDGET I 1 1 13 121=99.11 S mmiti m9e Sol -ARCH ►www.sokarch.com RFQ No. 15 -04 -01 PHASE SIX: CONSTRUCTION ADMINISTRATION (CA) During the construction of the project, we will make scheduled site visits to observe the progress and confirm that the project is being built as per the prepared Construction Documents on a bi- weekly basis. We will work closely with the General Contractor to keep the project on schedule and efficiently resolve any unexpected issues that may arise. When the project is close to completion, we will perform a "walk - thru" and prepare a Punch List of items that need completion or modification. We will work with you until the project is complete and you are fully satisfied with the results. (Actual time in weeks or months will be determined upon issuance of a project.) Sol -ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 Sol -ARCH Qualification Information and Assigned Personnel Sol -ARCH ► www.sokarch.com SOL -ARCH KEY PERSONNEL ORGANIZATION CHART RFQ No. 15 -04 -01 Below is Sol- ARCH's organization chart. The highlighted are key personnel in charge of the City's projects with the technical employees serving as support staff. Principal Architect Dulce Conde Technical Technical Marisela Raul I Conde Beiel SOL -ARCH, INC. (FEIN 20- 3874445) Project Manager Michael Figueredo Principal Architect Primitivo Conde Technpical Technical Technical Technical LTec Kristo her Niurka Emil Andres Juan Ruiz Mirabal Ebanks Alzate Calero Administrative Marketing Assistant Director EXPERTISE OF FIRM'S PROFESSIONAL STAFF Sol -ARCH has set itself as one of Miami -Dade County's leaders in sustainable design. We designed and built the first green building in Miami -Dade County, a Staples retail store (Biscayne Blvd) with a U.S.G.B.C. rating of "Gold ". We have set a series of green principles which have become our bench mark for the way we design. Dulce Conde, Primitivo Conde and Michael Figueredo bring experience and knowledge of the LEED certification process to their projects. Sol -ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 In addition to Sol -ARCH being a qualified architectural firm, Dulce Conde owner and the firm qualifier has over 10 years experience working in the building and zoning department of the City of Coral Gables. For three years she worked as a permit clerk followed by seven years as a zoning technician. Her expertise in civic and governmental offices stem from being an end user for over 10 years. She not only understands the day to day interdepartmental relationships but she has experienced how the customer uses these types of facilities. This type of knowledge is rare and instrumental to the design of your facilities. 1) Licensed architects: Dulce Conde, Primitivo Conde 2) Licensed engineers: N/A 3) Unlicensed technical support staff: Michael Figueredo, Raul Bejel, Marisela Conde, Juan Calera, Kristopher Ruiz, Niurka Mirabol, Emily Ebanks, Andres Alzate 4) Administrative Staff: Paolo Fonseca, Mercy Iglesias HOW TEAM SERVES THE CITY We know that our team best meets the needs of the City of Sunny Isles Beach. It would be an honor and pleasure for our team to work with you, your staff, and the community. Please accept this as our acknowledgement in response to the Submittal Package of RFQ No. 15- 04 -01. RESUMES Key personnel resumes with job descriptions and other detailed qualification information have been attached to this RFQ. Sol -ARCH ► www.sokarch.com EDUCATION Bachelor of Architecture University of Miami PROFESSIONAL REGISTRATION Registered Architect State of Florida No. AR 0015803 NCARB Certified AWARDS Port of Miami Maritime Park Award of merit AIA Award of excellence, SARA Gables Grand Plaza FAME Award Architecture Un -built Community Appearance Award - Fort Lauderdale Strautman Residence Dwors Residence YWCA Day Care Center Honorable Mention, SARA Design Excellence City of Miami Dulce Conde, RA Senior Architect, Principal Professional Design Experience Dulce Conde has over 28 years of experience with 11 of those years in private practice. As a registered architect Mrs. Conde has been involved in the design and project management of numerous projects ranging from school facilities to cruise terminals, luxury mixed - use /residential developments and retail facilities within the United States, Europe and South America. Many of these projects have earned design awards from local and national organizations. Her expertise lies in being able to understand her client's needs and translating them into design solutions that have surpassing the client's expectations. Mrs. Conde worked ten years with the City of Coral Gables Building and Zoning Department as a zoning technician reviewing commercial /mix -use high rise projects. Her ten year involvement with the City of Coral Gables Building and Zoning Department provides her knowledge and expertise that will ensure accurate review of architectural plans for single family homes for compliance with the Beach Property Owners Design Manual for the Ocean, North Beach and Seagate Overlay Districts. RESIDENTIAL EXPERIENCE Hollywood Townhouses, Hollywood, Florida - Lead designer /project manager involved in the planning, design, and design - development of 22,000 s.f. /15 unit townhomes. Sunset Harbor Townhomes, Miami Beach, Florida - Lead designer /project manager involved in the planning, design, design - development and client relations of a 120,000 s.f. of town homes and an apartment building. New French Village, Coral Gables, Florida - Lead designer /project manager involved in the planning, design, design - development and client relations of a 80,000 s.f. apartment building EDUCATIONAL /CHILD CARE Ryder Child Development Center, Miami Florida - Lead designer /project manager involved in the planning, design, design - development and client relations of a 13,000 s.f. remodel of a child care center. YWCA Day Care Center, Miami , Florida -Lead designer /project manager involved in the planning, design, design - development and client relations of a 28,000 s.f, two -story day care building. DCPS - Primary Learning Center, Miami, Florida - Lead designer /project manager involved in the planning, design, design - development and client relations of a programming prototype of a 30,500 s.f. primary learning center building. Kid S.P.O.T., Hollywood, Florida - Lead designer /project manager on a team involved in the planning, design, interior design and programming, design - development, ADA barrier removal, construction documentation and construction supervision of a 3,296 s.f. daycare. State School A, Miami, Florida -Lead designer /production manager involved in the planning, design, design - development and client relations of a DCPS school prototype. PUBLICATIONS University of Miami, Miami, Florida - Lead designer /project manager involved in the planning, design, FLORIDA DESIGN design - development and client relations of a Student Union remodel. Dwors Residence Fort Lauderdale, Florida UM Lobby, Miami, Florida - Project manager for lobby remodeling at Jackson Memorial, Rosenstiel 6,400 sf residence Building. Project Architect & Design COMMERCIAL /RETAIL EXPERIENCE _ HOME AND CONDO Miami International Airport, Miami, Florida- Lead designer /project manager involved in the planning, Sachs Residence design, design - development and client relations of improvements of FF and E at Miami Iniernational Naples, Florida Airport. EXPERIENCE Tann amt Airport, Miami, Florida - Project architect involved in the preparation of documentation for 28 years repairs caused by hurricane damage for two new metal hangars, 11,000 s.f. each. Dulce Conde, RA - -- --- - -- - - - -- -- ----- - - - - -- Senior Architect, Principal Opa -Locka Airport, Miami, Florida - Lead designer /project manager involved in the planning, design, design - development and client relations of a office refurbishment. Hermida Law Offices, Coral Gables, Florida - Lead designer /project manager involved in the planning, design, design - development, ADA barrier removal, and client relations of a 3,000 s.f. attorney's office. FIRC, Coconut Grove, Florida - Project manager in charge of involved in the planning, design, design - development , and ADA barrier removal of a 1,000 s.f. office space located in an office building. Ramada Inn, Hialeah, Florida - Project manager involved in the ADA compliance for hotel rooms, lounge and site of this hotel (approximately 15 rooms were remodeled). AUTOMOTIVE EXPERIENCE Autoway Chevrolet, Clearwater, Florida - Project architect involved in facility design, manufactured image compliance, ADA compliance and working drawings for image branding and renovation of existing 46,000 s.f. Chevrolet dealership. Courtesy Chevrolet Airport, Orlando, Florida - Project architect of a design team involved in the planning, design, interior programming, ADA compliance, and design, design - development, construction documentation and construction supervision of a 8,002 s.f. image branding of an existing automotive dealership. Courtesy Chevrolet West Colonial, Orlando, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 30,549 s.f. image branding of an existing automotive dealership. Maroone Chevrolet, Delray, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 17,725 s.f. image branding of an existing automotive dealership. Maroone Chevrolet, Ft. Lauderdale, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 16,620 s.f. image branding of an existing automotive dealership. Maroone Chevrolet, Pembroke Pines, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 14,659 s.f. image branding of an existing automotive dealership. Maroone Chevrolet of West Dade, Miami, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 27,570 s.f. image branding of an existing automotive dealership. Maroone Cadillac, West Palm Beach, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 60,943 s.f. image branding of an existing automotive dealership. Primitivo E. Conde, RA Senior Architect, Principal Professional Design Experience Mr. Conde has 26 years of experience in architecture leading master planning and design teams for a wide range of multifaceted projects including corporate office and retail /commercial developments, hospitality resorts, cruise terminal structures, residential and multiuse developments and specialty facilities in both domestic and international markets. Mr. Conde is also the VP of Design and Construction for BAP Development, an affiliate development arm of Bermello Ajamil the architectural /engineering service firm, a position he has held for the last 5 years. Projects have included luxury residential and multiuse developments and responsibilities that include complete project oversight, initial due diligence, assistance with project pro - forma and feasibility, consultant selection, contract negotiations, fee structures, in -house construction management and project close -out. Port of Miami Terminal 10 Expansion; Miami, FL - Project Manager on a 5- person team involved in the schematic PUBLICATIONS design, design development, construction documentation, construction supervision of a 90,000 -s.f. passenger Small House Book terminal facility within an existing warehouse building. Florida Energy House HOSPITALITY EXPERIENCE Book Hyatt Place /Summerfield Suites: Miami, FL - VP of Design and Construction in charge of the consultant team involved in the due diligence, feasibility, marketing, programming, master planning and design of a 10 story, 220 EXPERIENCE room hotel and 5 -story 250 car parking garage designed to house a business hotel with an extended stay 26 years component. There is a second parcel of land as part of the overall project designed that is comprised of a 70 unit luxury residential tower of 15- stories including parking garage. Boca Raton Hotel and Club Marina Hotel; Boca Raton, FL - Lead designer /project manager on a 3- person team involved in the site planning, programming, schematic design, design development, and pricing package of a 279 -room hotel that was part of an overall master planning and restoration effort for the existing hotel. RESIDENTIAL /MIXED -USE DEVELOPMENT EXPERIENCE EDUCATION Lakeview Center; WPB, FL - VP of Design and Construction in charge of the consultant team involved in the due Master of diligence, feasibility, marketing, programming, master planning and design of two 50 -story mix use towers Architecture comprised of a 9-story p arkin g p odium with 1,500 cars wrapped with luxury residential units, 57,000 s.f. of ground University of Florida, floor commercial /retail, 300,000 s.f. of offices, 350 luxury residential units and a 250 key business hotel. 1987 Premiere Towers; Miami, FL - VP of Design and Construction in charge of the consultant team involved in the Bachelor of Design in due marketing, feasibility, diligence, g Y 9. programming, master planning and design of two 50 story mix use towers Architecture, comprised of a 7 -story parking podium with 1,500 cars wrapped with 67,000 s.f. of flex space, 20,000 s.f. of University at Florida, round floor commercial /retail, 90,000 s.f. office and 550 luxury flat and loft t g ry type residential units. 1984 COMMERCIAL EXPERIENCE PROFESSIONAL Allstate Corporate Offices, Tampa, Florida - Lead designer /project manager on a 3- person team involved in REGISTRATION the planning, design, interior design and programming, design-development, construction documentation P 9, g g P g Registered Architect: di and construction supervision of two 5 -story office buildings of approximately 450,000 s.f. and 1,200 surface Florida - AR 0014406 Parking spaces for Maryland - 16525 Alabama -6934 Military Town Center - Boca Raton,. FL - Lead designer /project manager on a 3- person involved in the Georgia - A 013118 planning, design, design - development, construction documentation and construction supervision of a 10- Texas -22556 story office building of approximately 210,000 s.f. and a 5 -story detached 550 space parking garage and New York -34852 connector bridge. Building was purchased by W.R. Grace as their corporate headquarters and our team South Carolina -8410 was hired to perform the programming design; construction documentation, FF &E selection and Michigan - construction supervision for their interior tenant fit -out. 1301058235 New Jersey- MARITIME FACILITY EXPERIENCE 21 A101888300 Port of Miami Terminal 12 Parking Garage; Miami, FL - Project Manager on a 3- person team involved in the Tennessee - 104572 planning, design, construction documentation and construction supervision for a 5- level, 1,000 -car parking garage to support the existing terminal facility and RCCL corporate headquarters. NCARB Certified Port of Miami Terminal 10 Expansion; Miami, FL - Project Manager on a 5- person team involved in the schematic PUBLICATIONS design, design development, construction documentation, construction supervision of a 90,000 -s.f. passenger Small House Book terminal facility within an existing warehouse building. Florida Energy House HOSPITALITY EXPERIENCE Book Hyatt Place /Summerfield Suites: Miami, FL - VP of Design and Construction in charge of the consultant team involved in the due diligence, feasibility, marketing, programming, master planning and design of a 10 story, 220 EXPERIENCE room hotel and 5 -story 250 car parking garage designed to house a business hotel with an extended stay 26 years component. There is a second parcel of land as part of the overall project designed that is comprised of a 70 unit luxury residential tower of 15- stories including parking garage. Boca Raton Hotel and Club Marina Hotel; Boca Raton, FL - Lead designer /project manager on a 3- person team involved in the site planning, programming, schematic design, design development, and pricing package of a 279 -room hotel that was part of an overall master planning and restoration effort for the existing hotel. Primitivo E. Conde, RA Senior Architect, Principal MEDICAL FACILTY EXPERIENCE Westchester General Hospital; Miami, FL - Lead designer /project manager of a 3- person team involved in the programming, master planning, schematic design, design development construction documentation, construction supervision of a 4- story, 30 bed patient for the existing hospital. Building was elevated to allow for parking below Palmetto Medical Office Building; Hialeah, FL - Lead designer /project manager of a 2- person team involved in the programming, master planning, schematic design, design development construction documentation, construction supervision of interior tenant fit -out of all medical offices within a new medical office building. Doctor's office designed included, dentist, plastic surgeon, psychologist, general practice and OBGYN. AUTOMOTIVE EXPERIENCE AutoNation South; Miami, FL - Cc -Lead designer /project manager of a 3- person team involved in the programming, master planning, schematic design, design development, ADA compliance, construction documentation, construction supervision of a 10 ac prototype new /used automotive dealership with service facility for AutoNation Inc. Second prototype included a small off -site body shop. AutoNation Director of Design and Construction - Co- Director of Design and Construction (specializing in Design) for AutoNation interacting with automotive manufacturers in an effort to implement facility standards to new and existing facilities owned by AutoNotion. Lead consultant teams in the programming, design, schematic design, design development, ADA compliance, construction documentation, and construction supervision of over 400 new /used car dealerships throughout the United States that included at least one of every foreign and domestic automotive brand with a yearly financial responsibility of $100,000,000 - $150,000,000 (annual budget for design /construction related projects). Responsible for negotiating contracts with consultants, presenting to local municipalities and assisting in the day to day activities of the department. Automotive Dealerships - Throughout the USA - Lead project manager involved in leading design teams in the programming, design, schematic design, design development, ADA compliance, construction documentation, and construction supervision. Scope of work varies from minor renovations to new facilities. Projects include: • Bennett Chevrolet - Kingsland, GA • Capitol Chevrolet - Columbia, SC • Coast Cadillac - Sarasota, FI • Crest Cadillac - Venice, FI • Crest Cadillac - Nashville, TN • Greenwood Chevrolet - Fort Meade, FI • Homestead Chevrolet /Cadillac - Homestead, FI • Hudson Subaru - Jersey City, NJ • Massey Cadillac North - Orlando, FI • Massey Cadillac South - Orlando, FI • Massey Cadillac - Plymouth, MI • Mckenzie Buick - Milton, FI • Nalley Buick - Brunswick, GA • Nimnicht Buick GMC - Jacksonville, FI • Nimnicht Chevrolet- Jacksonville, Fl • Roger Dean Chevrolet- WPB, FI • Rosner Chevrolet - Melbourne, Fl • Sunset Buick GMS - Sarasota, FI • Sunset Chevrolet - Sarasota, Fl • Fiat South Miami - Miami, FI • Hollywood Honda - Hollywood, FI EDUCATION Bachelor of Design & Architectural Studies Florida International University Masters in Architecture Florida International University PROFESSIONAL REGISTRATION Registered General Contractor State of Florida No. CGC 1520395 EXPERIENCE 16 years Michael Figueredo Senior Project Manager, Principal Professional Design Experience Michael Figueredo is the founding principal of Sol -ARCH. Born and raised in Miami, Florida to Cuban parents, he received his Bachelor of Design in Architectural Studies and a Masters in Architecture from Florida International University. While attending F.I.U. he assisted the ATD (Advance Technology Department) by giving lectures on advanced techniques in a virtual environment. He also wrote the course workbook for the advanced modeling and lighting courses. This knowledge would serve as a valuable catalyst in launching Sol -ARCH. Under his direction, Sol -ARCH has grown into Miami's premier design & visualization studio. Today Sol -ARCH offers architectural design, planning, interior design, programming /space analysis, renderings, animations and scale models. He oversees the overall operations with a focus on financing and marketing. He is experienced in planning and designing projects ranging from mix -use commercial, lower and higher education, low, mid and high -rise luxury residential condominiums, office towers, hotels, automobile dealerships and single family residences. He oversees each project from schematic design to construction administration and remains involved until completion. He maintains a strict observance to client budgets and schedules which has made him a practical designer and problem solver. AUTOMOTIVE EXPERIENCE Maroone Chevrolet, Delray, Florida - Designer in a team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 17,725 s.f, image branding of an existing automotive dealership. Maroone Chevrolet, Miami, Florida - Designer in a team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 18,859 s.f. image branding of an existing automotive dealership. Homestead Mitsubishi, Homestead, Florida - Designer /project manager involved in the planning, design, design - development, ADA compliance, and client relations of a 12,500 s.f. automobile dealership. Roger Dean Chevrolet, West Palm Beach, Florida - Designer on a team involved in the planning, design, interior design and programming, design - development, ADA compliance, construction documentation and construction supervision of a 6,837 s.f. image branding of a automotive dealership. Maroone Chevrolet, Ft. Lauderdale, Florida - Designer on a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 16,620 s.f. image branding of an existing automotive dealership. Maroone Chevrolet, Pembroke Pines, Florida - Designer on a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 14,659 s.f. image branding of an existing automotive dealership. Maroone Chevrolet of West Dade, Miami. Florida - Designer on a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 27,570 s.f. image branding of an existing automotive dealership. Fox Chevrolet, Timonium, Maryland - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 9,672 s.f. image branding of an existing automotive dealership. Nimnicht Chevrolet, Jacksonville, Florida - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 12,859 s.f. image branding of an existing automotive dealership Michael Figueredo Senior Project Manager, Principal Greenwood Chevrolet - Project architect of a design team involved in the planning, design, interior programming and design, design - development, ADA compliance, construction documentation and construction supervision of a 5,717 s.f. image branding of an existing automotive dealership. Dealership was awarded a grant for Green Building for energy efficiency. COMMERCIAL EXPERIENCE Soler- Baillo Plastic Surgery, South Miami, Florida - Designer /project manager of a 3,200 s.f. build out with dual operating rooms. Caribbean Technology Center, Guoynabo, Puerto Rico - Designer /production and visualization on a 100,000 s.f. office building. Brickell East Gym, Miami, Florida - Designer /project manager, as well as construction administration, on a new gym and pool deck that required the City of Miami's architectural review board approval. Plaza San Remo Medical Suites, Coral Gables, Florida - Designer /project manager, as well as construction administration, on 3 private build outs that were 1,800 s.t. each. Bulgari, Miami, Florida - Designer /project manager on a new 6,500 s.f. retail store. Lucky 7, LLC, Miami Lakes, Florida - Designer /project manager in charge of the remodeling of a strip center after a fire (food shop, beauty salon, and hobby store). MIA Edge Beam, Miami, Florida - Project manager involved in identifying problems with the beam, preparing repair documents, pre bid and bidding meeting and construction management for repair of Edge Beam Terminal F, G and H that were approximately 1,000 s.f. Tamiami Airport, Miami, Florida - Project manager involved in the design, construction documents and construction management for restoration because of damage caused by a hurricane for building 221 and 24 that were approximately 13,000 s.f. each. Staples, Miami, Florida - Designer /project manager and visualization, as well as construction administration, on a 20,3000 s.f. new Staples building that was ranked LEED Gold. Hyatt Place, Miami, Florida- Designer involved in the due diligence, feasibility, marketing, programming, master planning and design of a 10- story, 220 -room hotel and 5 -story 250 -car parking garage designed to house a business hotel with an extended stay component. There is a second parcel of land as part of the overall project design that is comprised of a 70 -unit luxury residential tower of 15- stories including parking garage. St. Regis Hotel and Residence, Ft. Lauderdale, Florida - Designer involved in the planning, design, design - development and client relations of a 325,000 s.f. 213 key hotel and 20 condominium units. B &B Restaurant, Mary Brickell Village, Miami, Florida - Project architect on a team involved in the planning, design, interior design and programming, design - development, construction documentation and construction supervision of a 5,169 s.t. remodeling with addition of a Beer and Burger Joint restaurant. RFQ No. 15 -04 -01 SOL -ARCH PROFESSIONAL LICENSES RICK SCOTT, GOVERNOR KEN LAWSON, SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN AR0015b03 a lP The ARCHITECT Named below IS LICENSED Under the provisions of Chapter 481 FS Expvabon date. FEB 28, 2017 CONDE, DULCE M 4917 SW 74TH COURT MIAMI FL 33155 ISSUED'. 12MW014 DISPLAY AS REQUIRED BY LAW SEOk L1412DOW00530 RICK SCOTT, GOVERNOR KEN LAWSON, SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION *' BOARD OF ARCHITECTURE & INTERIOR DESIGN AR001"06 The ARCHITECT Named below IS LICENSED Under the provisions of Chapter 481 FS. Expiration date FEB 28, 2017 CONDE, PRIMITIVO E 4917 SW 74 COURT MIAMI FL 33155 ISSUED: 12/04/2014 DISPLAYAS REQUIRED BY LAW SEOn L1412NO001169 RICK SCOTT, GOVERNOR KEN LAWSON, SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD - CGC1520395 The GENERAL CONTRACTOR Named below IS CERTIFIED 77 S r Under the provisions of Chapter 489 FS -` Expiration date. AUG 31, 2016 FIGUEREDO, MICHAEL SOL -ARCH CONSTRUCTION LLC 4917 SW 74TH COURT MIAMI FL 33155 ISSUED: 07/0612014 DISPLAY AS REQUIRED BY LAW SEOa L1407060000463 Sol- ARCH ►- www.sol- arch.com SOL -ARCH LOCAL TAX RECEIPT odzaza Local Business Tax Receipt Miami —Dade County, State of Florida -THIS IS NOTA BILL - DO NOT PAY 6088694 BUSINESS NAMEAOCATION MECIll" NO SOLARCHINC RENEWAL 4917 SIN 74 Cr 6351290 MIAMI FL 33155 RFQ No. 15 -04 -01 LBT EXPIRES SEPTEMBER 30, 2015 Must be displayed at new of business Pursuant to County Code Chapter RA- Art 9 & 19 OW RR SEC TFE OF BUSINESS PA MEW RECEIVED SOL ARCH INC 412 P.A /DORP /PABTNEPSHIPlFIRM BY TAX COLLECTOR Employee(s) 3 $75.00 07/17/2014 CHECK21 -14 -022981 This lane[ Beanies Tax Receipt only coMim¢ psynent oNhe Local Busans Tax, The Receipt is Act license. parent or a cerliilcatlen of the held.,. p elibutioM,. do businect. Holder must comply w" any nocermmanral Men,verememal teprlmory lava add onnuire.ema which apply. the basin. The RECEIPT NO. above n he displayed on all nenmacial vehiUce -Miamd -Dade Cade Sec Ba375. For.ore orientation, mcd cateredbolouneftioneallacb, Sol -ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 Sol -ARCH Firm References Similar Work Completed Sol -ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 SOL -ARCH PROFESSIONAL REFERENCES Project Name: Historical Board Member of Hollywood Florida Address: 2600 Hollywood Blvd, Hollywood, Florida 33022 Project Type: Member of Hollywood Historical Board LEED Certification: N/A Scope of Work: Member of the Historic Preservation Board Cost: Depending on project scope Completion Date: Ongoing Contact Name: Jaye Espetein Phone Number: 954- 921 -3471 Project Name: City of South Miami Architectural Contract Address: 4795 SW 75th Avenue, Miami Florida 33155 Project Type: Continuing Architectural Services Contract LEED Certification: N/A Scope of Work: Chosen by the City of South Miami to provide architectural services for upcoming municipal projects. Complete analysis, inspection and design, and specifications for bathroom renovations and ADA compliance at Palmer Park. Cost: $200,000.00 Completion Date: Ongoing Contact Name: Ricardo A. Ayala Phone Number: 305- 663 -6350 Project Name: City of South Miami Architectural Contract Address: 4795 SW 75th Avenue, Miami Florida 33155 Project Type: Continuing Architectural Services Contract LEED Certification: N/A Scope of Work: Chosen by the City of South Miami to provide architectural services for upcoming municipal projects. Complete analysis, inspection and design, and specifications for bathroom renovations and ADA compliance at Dante Fascell Park. Cost: $200,000.00 Completion Date: Ongoing Contact Name: Ricardo A. Ayala Phone Number: 305- 663 -6350 Sol-ARCH ► www.sol- arch.com RFQ No. 15 -04 -01 Project Name: Tamiami Airport — Hangars 102 and 109 Address: 128005W 145 Avenue, Miami Florida 33186 Project Type: Two new metal hangars LEED Certification: N/A Scope of Work: Commissioned by Miami -Dade County to provide design of two metal hangars for fuel loaded plans in conjunction with adjacent office space. Will also produce Cost: construction documents and management. Cost: $1,700,000.00 (Construction) Completion Date: Ongoing Contact Name: Jorge Marin Phone Number: 305- 876 -7565 Project Name: Tamiami Airport— Restoration Address: 128005W 145 Avenue, Miami Florida 33186 Project Type: Renovation LEED Certification: N/A Scope of Work: Commissioned by Miami -Dade County to restore buildings 221 and 247 because of damages caused by Hurricane Wilma. Cost: $200,000.00 (Construction) Completion Date: 2012 Contact Name: Ricardo A. Ayala Phone Number: 305- 876 -7565 Sol -ARCH ► www.sol- arch.com ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT - SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Architectural Design Services for a New Facility Sunny Isles Beach, FL 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER 04/30/2015 15 -04 -01 Michael Figueredo, Principal B. NAME OF FIRM B. ARCHITECT - ENGINEER POINT OF CONTACT t -WAIL AUUNtJJ 305- 740 -0723 1305- 740 -0718 1 m @sol- arch.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) D. ORGANIZATIONAL CHART OF PROPOSED TEAM Q (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6)2004) PAGE 1 (Check) .z. CFO° 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT � io ma aka arnti a. CHECK IF BRANCH OFFICE b. CHECK IF BRANCH OFFICE C. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM Q (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6)2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM Principal Architect 15. FIRM NAME AND LOCATION (City and State) Sol -ARCH. Inc. 28 16. EDUCATION (DEGREEAND SPECIALIZATION/ 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND OISCIPL /NE) Professional Bachelors of Architecture State of Florida, Architecture Emergency Management Agency -EXP. 03/15/15, NCARB Certified, Port of Miami Maritime Park Award of Merit AIA & Award of Excellence SARA, Florida Design Dwors Residence, Home & Condo Sachs Residence, Gables Grand Plaza FAME Award, YWCA Day Care Center Honorable Mention 19. RELEVANT PROJECTS STANDARD FORM 330 (6/2004) PAGE 2 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED KidCO V & VI Miami, FL PROFESSIONAL SERVICES CONSTRUCTIONpfapp /icab /e) 2010 2012 d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LXJ Check if project performed with current firm Project architect for 2 daycares funded by City of Miami and Dade County. 2,500 sf and 4,000 sf, respectively. Scope: design, construction drawings and administraction. Total cost approximately, $900,000. (1) TITLE AND LOCATION (City and StateJ (2) YEAR COMPLETED Work Force One Reroo£ Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapp /icab /e) 2012 2012 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.J AND SPECIFIC ROLE x Check if project performed with current firm Project architect for a 30,000 sf reroof with a cost of $180,000. Scope: inspections, drawings, permitting and calculations. (1) TITLE AND LOCATION (City and State/ (2) YEAR COMPLETED Tamiami Airport Restoration, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION( /f app /icab /eJ Building 221 & 247 2009 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [2SJ Check if project performed with current firm C. Project architect for restoration because of damage caused by Hurricane Wilma for building 221 and 247, approx. 13,000sf each. Cost of construction approximately $200,000. Scope: inspections and completing construction documents. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MIA Edge Beam Miami, FL PROFESSIONAL SERVICES CONSTRUCTION /if applicable) 2012 d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project architect for repair of Edge Beam Terminal F, G and H (1,000 If). Approximate cost was $450,000. Scope: identify problems with beam and prepare repair documents, pre bid and bidding meeting, and construction management. (1) TITLE AND LOCATION (City and StateJ (2) YEAR COMPLETED Tamiami Airport, Two Metal Hangars Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If app licab le) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LLJ Check if project performed with current firm e. Project architect for two new metal hangars, 11,000 sf each. Approximate cost of construction was $1,700,000. Scope: design, construction documents and construction management. STANDARD FORM 330 (6/2004) PAGE 2 QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 70 proects, if not specified. Complete one Section F for each project./ 1 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Work Force One Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION Wapplicable) 2012 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER State of Florida Derrick Smith 305- 740 -0723 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Complete analysis, inspection and design for a reroof project. Approximate 30,000 sf at a stand alone work force office building in Hollywood Florida. Bidding and construction administration was also performed. Approximate cost of construction was $180,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6/2004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE 1. STANDARD FORM 330 (6/2004) PAGE 3 12. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Principal Architect 14, YEARS EXPERIENCE b. WITH CURREN 26 1 4 15. FIRM NAME AND LOCATION (City and State) Sol -ARCH. Inc. Masters of Architecture Minor in Structure and Historic Presentation Specializing in design, project management, and construction management . CURRENT PROFESSIONAL REGISTRATION (STATE AND D/SCIPLINE) Registered Architect in the State of Florida, Maryland, Alabama, Georgia, Texas, New York, South Carolina, Michican, New Jersey and Tennessee NCARB Certified, Emergency Management Agency Member (exp. 03/15/15) Park Award of Merit AIA & Award of Excellence SARA 19. RELEVANT PROJECTS Port of Miami Maritime STANDARD FORM 330 (6/2004) PAGE 2 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Port of Malaga Malaga, Spain PROFESSIONAL SERVICES CONSTRUCTION /If applicable) 2009 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LJ Check if project performed with current firm a. Lead architect for the master planning and adaptive reuse of an existing warehouse facility into a passenger cruise terminal. Approximately 600 gsm, and $1.8 million in construction cost. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fiat of South Dade Miami, Fl PROFESSIONAL SERVICES CONSTRUCTIONpf applicable) 2011 2011 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [XJ Check if project performed with current firm Lead Architect for the remodeling and expansion of an existing 6,500 gsf stand alone retail building into a Fiat delaership. Approximately 6,500 gsf and $1.1 million in construction cost. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Joseph Caleb District Courthouse Miami, FL PROFESSIONAL SERVICES CONSTRUCTION Of applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LXJ Check if project performed with current firm C. Consultant respnsible for specifications for the remodeling and expansion of the Johseph Caleb District Courthouse building. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rio Piedras San Pedro Sula, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Honduras 2011 d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed with current firm Lead architect for a mixed use retail office and residential project with underground parking. Approximately 35.035 m2 and $28 million in construction cost. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Williams Island Marina Aventura,FL PROFESSIONAL SERVICES CONSTRUCTION //f applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed with current firm e. Lead architect for the interior space planning and design of the main dock masters offices for the marina. Approximately 4,500 sf and $200,000 of construction cost. STANDARD FORM 330 (6/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 15, FIRM NAME AND LOCATION (City and State) Sol -ARCH. Inc. Masters of Architecture 14. YEARS EXPERIENCE Project Manager 1 16 . CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida Certified General Contractor 19. RELEVANT PROJECTS STANDARD FORM 330 (6/2004) PAGE 2 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Staples Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2007 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE LXJ Check if project performed with current firm e. Project manager for new 20,300 sf retail facility, US GBC Gold rating first leed retail building in Miami Dade County. Scope: design, production of working drawings, visualization and construction administration. Project cost approximately $2,000,000.00 (1) TITLE AND LOCATION (City and State) 1 (2) YEAR COMPLETED The World Island Dubai, United PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Arab Emirates 2009 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project manager for the design of multiple islands including Brunki, Arabian Nights, Heart of Europe, Paraiso, Severnaya, and UK. Scope: master planning, zoning analysis and design of mix -use facilities. (in conjuncion. with Bermello, Ajamil & Partners) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dr. Soler Baillo Plastic Surgery Miami, FL PROFESSIONAL SERVICES CONSTRUCTION ( /f applicable) 2008 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm C. Project manager for an interior design project of 3,200 sf plastic surgery office, .including two surgical suites. Scope: interior design and interior finish purchasing. Project cost approximately $150,000. (1) TITLE AND LOCATION Icily and State) (2) YEAR COMPLETED Autoway Chevrolet Clearwater, FL PROFESSIONAL SERVICES CONSTRUCTIONpf app licab le/ 2011 2012 d. X (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project manager for image branding and renovation of existing 46,000 sf Chevrolet dealership. Scope: facility design, manufactured image compliance, working drawings and construction administration. Project cost was approx. $2,000,000.00 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maroone Chevrolet of Miami Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 13) BRIEF DESCRIPTION /Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm e. Project manager for image branding and renovation of existing 46,000 at Chevrolet dealership. Scope: facility design, manufactured image compliance, working drawings and construction administration. Project cost was approx. $5,000,000.00 STANDARD FORM 330 (6/2004) PAGE 2 KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or f0 projects, if not specified. Complete one Section F for each project.) 2 21. TITLE AND LOCATION /City and State) 1 22. YEAR COMPLETED Autoway Chevrolet Largo, FL PROFESSIONAL SERVICES CONSTRUCTION()/ applicable) 2011 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Autonation Carl Fortnev 416- 269 -1957 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Sol -ARCH was commissioned for the renovation and image branding of an existing 46,000 sf Chevrolet dealership in Clearwater, FL. Scope included the plans for the facility design, manufactured image compliance package, working drawings and construction administration. The approximate cost of construction was $2 million. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (612004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) HOLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE 1. STANDARD FORM 330 (612004) PAGE 3 QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 70 projects, if not specified. Com lere one Section F for each rolect.l 3 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED IC Rio Piedras Sari Pedro Sual, PROFESSIONAL SERVES CONSTRUCTION (If applicable) Honduras 0 0 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER lb. POINT OF CONTACT NAME 1, PnINT nF rnKITAIT TFl rounNP U InnavP Grupo Corinsa I Roberto Linhares 1 305- 965 -0011 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) A mixed use development located on a sloping site in San Pedro Sual, Honduras. The area of the site is about 4,565 m2 and will cost an estimated $28 million to develop the 35,035 m2 multi -story project. It is programmed to contain several major retail shops, fine dining restaurants, cafes and professional office space organized around an enclosed plaza with residential units above. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6/2004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 EXAMPLE NUMBER (Present as many projects as requested by the agency, or 10 pro "ects, if not specified. Complete one Section F for each Protect. ci. 22. YEAR COMPLETED Fiat Perrine, FL PROFESSIONAL SERVICES CONSTRUCTION(1fapplicab /e) 0 0 a. 23. PROJECT OWNER'S INFORMATION Sean Gearhart POINT 24. eHIEF UhSCHIF I IUN OF PKUJEC I AND HELEVANCE I U 1 HIS CONTRACT (include scope, size, and cost) Sol -ARCH was commissioned to work closely with Chrysler and their DID (image branding) to design a prototype that would launch their new Fiat cars into the market. The dealership consisted of offices, showroom and service center. Scope included remodel and expansion of an existing 6,500 sf stand alone retail building into a Fiat Dealership. Approximate total cost of construction was $1.1 million. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6 /2004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (21 FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6 /2004) PAGE 3 F. EXAMPLE NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each Droiect. 61 21. H I LE AND LUCA I JUN lcrty and State) 1 22. YEAR COMPLETED Joseph Caleb Center Miami, Fl PROFESSIONAL SERVICES CONSTRUCTION ( /f applicable) 0 0 a. 23. PROJECT OWNER'S INFORMATION of Miami I Raul Carreras 1 305 - 859 -2050 TELEPHONE 24. HHIEF UESCHIH I JUN OF PHUJEC I AND HELEV ANCE I U I HIS CUN 1 HAU I (include Scope, site, and Coall As part of a minority set aside contract and in conjunction with Bermello & Ajamil and partners, Sol -ARCH prepared and coordinated the specification for the project. Sol -ARCH worked with B&A project architect in coordinating the working drawing set with the specs. We also worked with the consulting engineers and City of Miami. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6/2004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. 0) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 OUALIFICAI IONS FOR THIS CONTRACT I NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 21. TITLE AND LOCATION (City and State) Williams Island Marina Aventura, FL 23. PROJECT OWNER'S INFORMATION 22. YEAR COMPLETED _SERVICES CONSTRUC 0 a. rnwe11 uvV'11n o. ruuN I ur CUN I AU I NAME m POINT OF CONTACT TELEPHONE NUMBER Scott Hizinga Bill 305- 937 -7813 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Marina at Williams Island is part of a mix -use project in an established community. The marina building is a 4,500 sf interior fit up at the base of a residential tower. The cost of the project is $200,000. The scope included to design and do construction documents for the facility. The two -story space has the marina offices, conference room and the second floor has the crew space consisting of showers, laundry room, recreation room and a gym. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (612004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and Statei (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE 1. STANDARD FORM 330 (612004) PAGE 3 F. EXAMPLE PROJEC (Present as many projects as Tamiami Airport Restoration Bldq 221 & 247 a. FtiuiLCl UVVNI Miami Dade r ency, or ty or each projt Miami, FL I TEAM'S if not specified. 23. PROJECT OWNER'S INFORMATION . POINT OF CONTACT NAME Marin 20. EXAMPLE PROJECT KEY NUMBER 7 22. YEAR COMPLETED - 876 -7565 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cast) The commissioning of this project for Sol -ARCH was to prepare documentation for repairs caused by Hurricane Wilma for building 221 and 247. Scope of work included identification of damage, panel repair and painting. In addition two canopies with metal roofs were added. Approximate size is 13,000 s£ each and the approximate cost was $200,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (612004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME 12) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) 13) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (612004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F far each project. 8 21. TITLE AND LOCATION icily and State) 22. YEAR COMPLETED Tamiami Airport Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Hangars 1 and 2 1 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Miami Dade County Jorge Marin 305- 876 -7565 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT finclude scope, size, and cost) Sol -ARCH was commissioned to be the project architects for two new metal hangars, 12,000 sf. Approximate cost of construction was $1,700,000. Scope: design two metal hangars for fuel loaded planes in conjunction with adjacent office space. The design will include close monitoring of the Kendall Tamiami Airport storm water management plan and all the NFPA required fire suppression systems. In addition, Sol -ARCH will produce construction documents and provide construction management. (Project is ongoing) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (8/2004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. 0) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION icily and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (8/2004) PAGE 3 1 TEAM'S (Present as many projects as requested by the agency, or 10 projects, if not specified. COMDlete one Section F for each oroiect.l 21. TITLE At Staples Miami, FL 23. PROJECT OWNER'S INFORMATION NUMBER 22. YEAR COMPLETED E a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Staples Bill Biondi 305- 284 -2211 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT flnclude scope, size, and cost) Sol -ARCH was commissioned to design and perform construction management for the Staples retail store that was approx. 20,300 sf located at 2121 Biscayne Blvd in Miami. During the planning and design phase we worked closely with the City of Miami and Mayor, Manny Diaz, as the project would serve as the benchmark for the future city of Miami projects which now require U.S.G.B.C. certification. Our project received a U.S.G.B.C. rating of "Gold ". The approximate cost of construction was $2,000,000.00 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (612004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (612004) PAGE 3 PROJECT QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 pro jects, if not specified. Complete one Section F for eac 1 10 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED MIA Edge Beam Miami, FL PROFESSIONAL SERVICES CONSTRUCTION( /fapp /icabte) 2008 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Miami Dade County Jorge Marin 305- 876 -7565 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The scope of work for the edge beam repair at terminal F, G and H entailed repairing all areas of water leaking between terminal building and driveway. Spalled areas of concrete have rusted through to the reinforcement. Prior to work being done, the existing soffit had to be removed and inspected for damages. The challenge here was how soffits were removed, stored, preserved, reinstalled, and ultimately performing the concrete restoration work without interrupting terminal use. Size was 1000 lineal ft, and the approximate cost was $450,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6/2004) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 1 6 7 8 9 10 Dulce Conde Principal Architect/ Project Manager X X X Restoration Bldg 221 & 247 X K X Tamiami Airport - X Primi Conde Principal Architect/ Project Manager X X X X K Fiat Dealership X Staples 4 Michael Figueredo Project Manager K Joseph Caleb Center 10 MIA Edge Beam X X K X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) Work Force One Williams Island Marina 1 6 Autoway Chevrolet Tamiami Airport - 2 7 Restoration Bldg 221 & 247 Rio Piedras Tamiami Airport - 3 8 Hangars 1 & 2 Fiat Dealership Staples 4 9 5 Joseph Caleb Center 10 MIA Edge Beam STANDARD FORM 330 (6 /2004) PAGE 4 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE Michael Figueredo, Principal STANDARD FORM 330 (8/2004) PAGE 5 1 SOLICITATION NUMBER [If any) ARCHITECT - ENGINEER QUALIFICATIONS 15 -04 -01 (if a firm has branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Sol -ARCH, Inc. 3. YEAR ESTABLISHED 4. DUNS NUMBER 2b. STREET 4917 SW 74th CT 5. OWNERSHIP a. TYPE Corporate 2c. CITY Miami 2d. STATE FL 2a. ZIP CODE 33155 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Dulce Conde, Principal 7. NAME OF FIRM [If block 2a is a branch office) N/A fib. TELEPHONE NUMBER 305 - 740 -0723 6c. E -MAIL ADDRESS d @sol- arch.com Be. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED I So. DUNS NUMBER N/A 837373914 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 2 0 C05 Child Care Development 1 U/ Architect 2 0 C10 Commercial Building 2 08 CADD Technician 6 U C15 Construction Management 2 48 Project Manager 1 0 D04 Design Build 1 H09 Hospital and Medical 1 H11 Housing 2 I01 Industrial Buildings 4 I05 Interior Design 1 001 Office Buildings 2 P06 Planning 3 R12 Roofing 1 S11 Sustainable Design 1 Z01 Zoning Land Use 1 Other Employees Total 11 U 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2 $100,00 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million j 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 3 b. Non - Federal Work 6 c. Total Work 6 12. AUTHORIZED REPRESENTATIVE Michael Figueredo, Principal AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 6 RFQ No. 15 -04 -01 Sol -ARCH Corporate Standing Sol -ARCH ► www.scI- crch.com 6/2!2015 Detail by Entity Name Florida Profit Corporation SOL -ARCH, INC. Filina Information Document Number P05000156804 FEI /EIN Number 203874445 Date Filed 11/2912005 State FL Status ACTIVE Last Event AMENDMENT Event Date Filed 01/11/2013 Event Effective Date NONE Principal Address 4917 SW 74 COURT MIAMI, FL 33155 Changed: 12/08/2006 Mailing Address 4917 SW 74 COURT MIAMI, FL 33155 Changed: 12/08/2006 Registered Agent Name & Address FIGUEREDO, MICHAEL 4917 SW 74 CT MIAMI, FL 33155 Name Changed: 08/27/2010 Address Changed: 08/27/2010 Officer /Director Detail Name & Address Title D Detail by Entity Name FIGUEREDO, MICHAEL 4917 SW 74 COURT MIAMI, FL 33155 httpY/ search. sunbiz. org /Inquiry/ CorporationSearctVSearchResultDe tail ?irquirytype =En ityName &directionType= Initial& searchNameOrder= SOLARCH %20PO... 113 6/212015 Title D CONDE, DULCE M 4917 SW 74 COURT MIAMI, FL 33155 Title D CONDE, PRIMITIVO, E 4917 SW 74 COURT MIAMI, FL 33155 Annual Reports Report Year 2013 2014 2015 Document Images Filed Date 01/08/2013 03/20/2014 01/14/2015 01/14/2015 -- ANNUAL REPORT Detail by Entity Name View image in PDF format 03/20/2014 -- ANNUAL REPORT Viewimage in PDF format 01/11/2013 -- Amendment Viewimage in PDF format 01/08/2013 -- ANNUAL REPORT View image in PDF format 11 /20/2012 -- Amendment View image in PDF format 01/04/2012 -- ANNUAL REPORT View image in PDF format 04/29/2011 --ANNUAL REPORT View image in PDF format 08/27/2010 -- Reg. Agent Change View image in PDF format 01/07/2010 -- ANNUAL REPORT View image in PDF format 04/15/2009 -- ANNUAL REPORT View image in PDF format J 04/08/2009 -- ANNUAL REPORT 03/25/2009 -- Off /Dir Resignation 01/20/2009 -- ANNUAL REPORT 04/30/2008 --ANNUAL REPORT 02/01/2007 -- ANNUAL REPORT 01/02/2007 -- Amendment 12/08/2006 -- REINSTATEMENT View image in PDF format View image in PDF format View image in PDF format View image in PDF format View image in PDF format View image in PDF format View image in PDF format 11/29/2005 - Off /Dir Resignation _ View image in PDF format _ J 11/29/2005 - Domestic Profit View image in PDF format P ) , s i � I httpJ/ search. sunbiz. org / Inquiry/ CorporatiorSearct ✓SearchResUtDetail? inquirytype= Ert UtyName& directionType= [Ntial&searchNameOrder= SOLARC H %20P0... 2/3 RFQ No. 15 -04 -01 Sol -ARCH Attachments and Forms Sol -ARCH ► www.scl- arch.com " OF SOFA "',. SECTION 6 RESPONDENT SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES 7_131111A LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ PART II: Addendum #1, Dated 05 1 M 115 Addendum #2, Dated 05 130115 Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: So I `ARCH , Inc. AUTHORIZED SIGNATURE: DATE: OU 161115 TITLEOFOFFICER: Principal City of Sunny Isles Beach I Request for Qualifications No. 15 -04 -01 .qr Of SUN RESPONDENT SUBMITTAL FORM Architectural Design Services for a New Facility at 18080 Collins Ave. The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Firm represents, as more fully set forth in the Agreement, that: • The Firm has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. • The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. • This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. City of Sunny Isles Beach I Request for Qualifications No. 15 -04 -01 . r,, pr So P . Firm Name: Sol -ARCH, Inc. 4917 SW 74th CT, Miami, Florida 33155 Street Address: Mailing Address (if different): Telephone No. 305 - 740 -0723 Fax No. 305 - 740 -0718 Email Address: m @sol- arch.com FEIN No. 21 0- 3/8/_7/_JJ 5 * "By signing this document the Responder agrees to all Terms Signature: (Signature of authorized agent) Print Name: Michael Figueredo Principal Title: THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF FIRM TO BE BOUND BY THE TERMS OF ITS SUBMISSION. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE SUBMISSION NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY SUBMISSION THAT INCLUDES AN EXECUTED DOCUMENT, WHICH UNEQUIVOCALLY BINDS THE FIRM TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Qualifications No. 15 -04 -01 y1r of SUN W- UI y i9 j F c,Ty NY C� �oP P * FLpEt OS OF SUN P City of Sunny Isles Beach I Request for Qualifications No. 15 -04 -01 O SUNNY NON - COLLUSION AFFIDAVIT u City of Sunny Isles Beach •', 9'- jp 18070 Collins Avenue Lf f,TYFL OP`OV s� Sunny Isles Beach, FL 33160 yr svB '� Telephone: (305) 947 -0606 Fax: (305) 949 -3113 STATE OF FLORIDA COUNTYOF Miami -Dade) The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be fled with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Sol -ARCH, Inc. (Name of Corporation, Partnership, Individual, etc.) a. Corporation formed under the laws of Florida (Type of Business) (State) of which he is Partner (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. ny_-_-3zQ , Principal AFFIANT'S NAME Michael Figueredo AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this day of j 1Ar>,\X 2l Personally Known or Produced Identification Type of identification (Affix seal here) L' 93 u0is twwoodx3 ap� Eb LBlZ 33 uaZ'Lo OAyy $ apu00 elasueyy epuold W We1S ollQnd,ireloN eECEMBEF28,2010 (/ V I A..-� l,f� NOTARIY PUBLIC (name printed or typed) MAQ.ISELA C-Ol 1 of 7 V S,NNY ISf FfB PUBLIC ENTITY CRIMES V I City of Sunny Isles Beach _ 18070 Collins Avenue ;f' �)� FLOW " Sunny Isles Beach, FL 33160 v,FY o. sax s Telephone: (305) 947 -0606 Fax: (305) 949 -3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to _City of Sunnv Isles Beach by Michael Figueredo pan inorviauars name ana vital for Sol -ARCH, Inc. Liprint name at entity submitting sworn statementi whose business address is: and (if applicable) its Federal Employer Identification number (FEIN) is 20-3874445 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: ) 11.2. 1 understand that a 'public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER28,2010 2 of market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: (Signature) � Michael Fiqueredo (Printed Name) Principal (Title) Sworn to and subscribed before me this z day of I- 20 I , by MICR ,EL t= ILUEI2.EDO $ Notary Public State of Floritla Marisela Conde Signature: Notary Public - State of Florida �j, p My commission EE 219143 Me.ws£c -a. "t.J00 'Bq rys' Expires 07 /24/2016 Print or Type Commissioned Name OR Produced Identification Type of Identification Produced 10/1998 3 of 7 oy S,NNY I5, f B r EQUAL OPPORTUNITY / AFFIRMATIVE ACTION 'IF w ° 4W' City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: n� Q j Title: Principal Firm: Sol -ARCH, Inc. Address: 4917 SW 74th CT Miami, Florida 33155 DECEMBER 28, 2010 4 of 7 O S�NNV IS(FF6 CONFLICT OF INTEREST City of Sunny Isles Beach •' r •� 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTYOF Miami -Dade BEFORE ME, the undersigned authority, personally appeared Michael Figueredo , who was duly sworn, deposes, and states: 18.1. I am the Principal of Sol -ARCH, Inc. with a local office in 4917 SW 74th CT and principal office in 4917 SW 74th CT . 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 1S-04-01 described as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.91n the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. Dated this 2_ day of '`t t'1^^'e^ 20% j J Michael Figueredo, Principal AFFIANT Print or Type Name and Title Syl6rn to and subscribed before me this ? Personally Known O Produced Identification NOTARY PUBLIC STATE OF FLORIDA aNotary Public State of Florida Marisela Conde My Commission EE 219143 Expires 07/24 /2016 —day of TVIA�t 2015. -OR _; Type of Identification DECEMBER 28, 2010 5 of 7 e^ DISPUTE DISCLOSURE City of Sunny Isles Beach •� - �•• 18070 Collins Avenue :o9i �•llo P+` Sunny Isles Beach, FL 33160 oI vv +'0 o Telephone: (305) 947 -0606 Fax: (305) 949 -3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Sol -ARCH, Inc. Firm Authorized Signature May 31, 2015 Date Michael Figueredo, Principal Print or Type Name and Title DECEMBEn28,2010 6 of 7 O SONNY 1,1R O F FLOW V Fy t STATE OF FLORIDA ) COUNTY OF Miami -Dade ) ANTI - KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949-3113 ANTI - KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: n:��L Title: Michael Figueredo, Principal The foregoing instrument was acknowledged before me this Z day of UVA"t 20 l5, by _ r -��u,A � Fi &vF_l�r_-'o [name of person], as T>rZINCI J?A.C_ [type of authority], for 'So t.— A.ii;Le i [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: ,.JON Notary la co State of Flodda i Mariaela Conde 4 g My Commission EE 219143 pF n, ExpMS O7M24 /2016 Personally Known Type of Identification Produced Notary Public — State of Florida MPR -IS��. FONDS Print or Type Commissioned Name OR Produced Identification DELEMBER28,2010 7 of