Loading...
HomeMy WebLinkAboutWolfberg Alvarez & PartnersARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.1 WOLFBERG ALVAREZ & PARTNERS ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN SUSTAINABILITY CITY OF SUNNY ISLES BEACH Request for Qualifications for Architectural Design Services for a New Facility at 18080 Collins Ave. June 2, 2015 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.2 WA has designed a vast array of civic and other community centers as well as educational learning centers that have included mixed-use facilities throughout South Florida. CIVIC PRIDE ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.3 WOLFBERG ALVAREZ & PARTNERS 3233 Aviation Ave., Suite 400 Miami, FL 33133 Ph. 305-666-5474 Contact: Marcel Morlote, R.A. City of Sunny Isles Beach RFQ No. 15-04-01 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.4 Title Page Cover Letter and Executive Summary Project Approach and Understanding Qualification Information and Assigned Personnel Firm References and Similar Work Completed Corporate Standing and Authorized Signatory Forms and Attachments 1 2 3 4 5 6 June 2, 2015 Jane A. Hines, MMC, City Clerk City of Sunny Isles Beach 18070 Collins Ave. Sunny Isles Beach, FL 33160 RE: RFQ NO. 15-04-01, ARCHITECTURAL DESIGN SERVICES FOR A NEW FACILITY AT 18080 COLLINS AVE. Dear Commissioners: It is with great interest that Wolfberg Alvarez & Partners (WA), submit its qualifications to provide Architectural and Engineering design services for the new mixed-use facility at 18080 Collins Ave. WA doesn’t specialize in one particular building type which will work to the city’s advantage in the design of this project as the firm will be able to bring all its knowledge from educational facilities, libraries, recreation, civic buildings, public safety facilities, and other public and private mixed-use developments. WA’s last project in Sunny Isles Beach was a couple years ago with the classroom building addition at the Norman S. Edelcup Sunny Isles Beach K-8 Center. Currently, the firm is providing architectural planning services Bal Harbour Village and a few years ago completed the expansion of Bay Harbour Islands Ruth K. Broad K-8 Center. WA believes in a high level of client interface throughout the entire duration of a project, with attention to details and stands by a successful track record delivering on a vast array of municipal and commercial projects that have been designed and built on-time and within budget, regardless of size and complexity. WA has a large staff and can assign additional staff members to meet any deadline proposed by the city if selected for this exciting new project, WA will meet all schedules and budgets. The city has our commitment to finishing the design work on-time and we are confident that our experience, depth and our successful completion of similar projects, that WA will be able to respond to all of the city’s design needs. Equally as important, with our positive approach to problem solving, we will not only meet the your needs, but the firm will also offer a level of professional service that will exceed expectations. Sincerely, Julio E. Alvarez, P.E. President EXECUTIVE SUMMARY ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.7 EXECUTIVE SUMMARY WA is a local South Florida firm that has established a national reputation for design initiative and perfor- mance. A Florida corporation founded in 1976, by Julio E. Alvarez, P.E. and David Wolfberg, the firm has provided comprehensive design services for a diverse range of public facilities. Experience With Public Agencies WA has completed numerous local, state and fed- eral governmental projects including the design of administration buildings, mixed-use libraries and community centers, parks, plazas, historical resto- ration, vehicle maintenance facilities, police facili- ties, judicial, detention and public safety projects. Having completed design work for more than 60 re- lated agencies in the United States and Caribbean, the firm understands the needs of public agencies to meet established budgets and schedules, while achieving a functional, secure and well designed fa- cility. In-House Architectural and Engineering Design The architectural team offers comprehensive plan- ning, architectural and interior design services for a wide range of public and private clients. They are dedicated to achieving design excellence by tailoring designs to suit each client’s needs. What drives us is the client’s program, functionality, sustainability, cost effectiveness and aesthetics. Interdisciplinary collaboration early in the design pro- cess is critical to maximize sustainability opportuni- ties. Our architects and engineers work side-by-side from the inception of a project to develop innovative and creative solutions to achieve a high level of effi- ciency, sustainability and design success. Sustainability WA feels that every project should take into account any effort to institute “Green Building” principals and waste reduction. The has provided comprehensive LEED advisory services, which entailed detailed involvement in a project from initiation through ac- ceptance and initial occupancy. As consultants, WA guides the Team towards sustainable options across all site, water, energy and materials categories. From its initial concept, the firm actively participates throughout the project to ensure that the owner’s goals are defined, managed and met in the most cost-effective way possible. To have a successful project will require close coor- dination with the city, particularly at the outset of the project, where fundamental decisions will be made. This open channel of communication is important in order to receive proper direction and information and to keep the city constantly apprised of our progress. STABILITY WITH A TRUSTED NAME WA provides an integrated spectrum of ser- vices designed to not only meet the imme- diate needs of our clients, but also their big picture priorities. The firm offers extensive ex- perience serving municipalities, counties, and governmental agencies. Because WA is a multidisciplinary firm, it has the expertise and personnel to tackle all aspects of the project outlined in the RFQ for the new mixed-use fa- cility. WA’s workload is also very favorable to start working on the project today! PROJECT APPROACH AND UNDERSTANDING ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.9 PROJECT APPROACH AND UNDERSTANDING The new mixed-use facility being proposed rep- resents a major capital investment by the City of Sunny Isles Beach. WA pledges it will take a fresh and innovated approach to the project and will bring many new ideas and concepts to the city to help it visualize the project. Mixed-use community facilities help to consolidate and reduce operating costs they also offer a chance to be more integrated into the community. These fa- cilities offer a more traditional feeling while gaining some of the benefits of additional foot traffic and a central location. To have a successful project will require close coor- dination with the city, particularly at the outset of the project, where fundamental decisions will be made. This open channel of communication is important in order to receive proper direction and information and to keep the city constantly apprised of our progress. Overall Project Management and Coordination with the City The WA Team will be organized beginning with, the principal-in-charge (PIC), Julio E. Alvarez, P.E., who will direct the overall effort of the Team, and will be responsible for allocating personnel, financial and production resources necessary to execute the work plan and accomplish the project’s goals and objectives. The PIC, working closely with the project manager, who will monitor the project’s progress to ensure adherence to contractual terms and conduct periodic audits of schedule and technical perfor- mance of all in-house personnel as well as outside consultants. The project manager, Marcel Morlote will be the team’s single point of contact for the city, as well as all other entities and agencies. The project manager, with the support and assistance of the architectural and engineering coordinators, will be responsible for assigning resources of the Team to the various work tasks, and maintaining regular communication as to progress of work with the city’s project manager. Mr. Morlote will oversee the overall design and pro- duction effort, and will monitor project schedule and identify problems in order for them to be resolved in a timely man- ner. He will establish and implement the Team’s quality control pro- cess, and will be responsible for scheduling internal project reviews of all submittals be- fore they are delivered to the city. Site Analysis and Opportunities An on-site analysis will take place and include verifi- cation of above ground utilities, obstructions, existing vegetation, character of adjacent properties, and any other pertinent elements. Following site inventory and analysis will be the preparation of conceptual al- ternatives that depict the character and intent of the master plan. The initial site visit will introduce the design project team to the city’s team, and will serve to assess existing conditions, area for demolition, review the scope of work, identify tasks specific to each team member, identify potential problems and possible solutions, define project boundaries and discuss the overall design that will be needed to meet permitting requirements and accomplish the project objectives. Aerial photographs will be analyzed to evaluate the relationship of the project with adjacent lands and how the proposed improvements will affect private and public landowners in neighboring areas. Team members will participate in periodic project meetings to discuss progress, proposed construction tasks, Wolfberg Alvarez provides innovative, multi-disciplined design services coupled with practical, cost- effective project management. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.10 identify potential problems, work out solutions and continue the exchange of project information. Addi- tional meetings with governing agencies, utility com- panies, adjacent landowners and the general public to develop consensus with all affected parties will be scheduled as necessary. Design Approach and Alternative Analysis of Plans and Specifications Each phase will have specific goals, deliverables, and milestones with steady consultation and interaction between our firm and the city. Information, questions, responses, sketches and drawings will be made read- ily available to the city. During the initial conceptual and schematic design phases of the project, we cus- tomarily like to perform “charettes” with the owner’s selected project representatives. This method pro- duces the most dialogue and results in significant time reduction. It is also an effective tool in encourag- ing staff involvement and in empowering them in the design process. Cost Estimating Recognizing the critical impor- tance of cost management when budgets are tight, WA will commence cost con- trol procedures immedi- ately upon issuance of the Notice to Proceed on the project. The techniques to be utilized by the team for cost con- trol include, but are not limited to: • Program and Budget Review: A detailed review of the program and budget will be conducted to ensure validity and compatibility. • Systems Budgeting and Estimating: All budget estimating will be divided into subsystem com- ponents to allow for identification and control of specific problem areas. • Cost Trending: A careful charting of the on-going estimates will be performed to evaluate a direc- tion that might be developing as the project pro- gresses. PROJECT DELIVERABLES TASK 1: DESIGN & SCHEMATIC DESIGN • Understanding of the Project - Team analyzes program and completes a site visit • Site development conceptual planning • Utility development planning • Circulation • Planning, zoning and code analysis • Prepare budget • Deliver schematic design drawings and docu- ments for preliminary approval TASK 2: DESIGN DEVELOPMENT • Design development plans, components will include: program scope, uses relationships, sizes, finishes, materials and colors, plant- ings, exterior and interior finishes etc. • Code analysis compliance • Develop the MEP and irrigation drawings • Pedestrian circulation • LEED certification if applicable, proposed sustainable design elements and products • Submit design development drawings and documents to the city for review TASK 3: CONSTRUCTION DOCUMENTS • Construction documents and specifications preparation based on approved Design Devel- opment Documents and updated budget. • Incorporate city requirements for completing Construction Documents • Deliver 100% Construction Documents and 100% Project manual TASK 4: BIDDING AND PERMITTING • Competitive bidding and bidding assistance and value engineering • Provide the city assistance during the permit- ting process ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.11 • Complete and Detailed Documents: Attention will be directed to complete, coordinated con- struction documents in order to ensure tight bids and fewer change orders. Cost estimate development and updates at the var- ious stages will include quantification of all major project elements, even at the earliest stages of plan development. Progress estimates are prepared from completed drawings to validate the budget or indi- cate if design cost exceeds budget parameters. Project Scheduling WA takes pride in an outstanding record for re- sponsiveness to established schedules. Particularly important to this contract is our exceptional record for meeting constrained schedules for contracts in- volving public facilities. In the execution of mixed- use projects, the firm has always met schedule de- mands. Schedule management for this contract will be accomplished through proven project manage- ment procedures combined with a productive project team and an ongoing schedule evaluation process. A formal schedule will be developed to respond to the specific needs of each task and the project manager will regularly meet with the city personnel to review schedule progress and requirements on that project. Quality Control/Quality Assurance WA assigns a quality control manager to review the documents for constructibility and general coordi- nation disciplines. The project manager and project coordinator review the documents for incorporation of all items in the scope services. The project is also reviewed by the department heads in each discipline for accuracy and completeness. A member of the specifications department reviews each phase with the project manager to coordinate the specifications. EXISTING CONDITIONS We develop solid innovative designs based on a thorough understanding of the existing site through the review of surveys, geotechnical testing reports, as-built plans, existing reports, utility markups and public sentiment. PERMITTING We know your regulatory permitting requirements and the limitations that these requirements pose on the design of the project will be identified prior to engaging in the design of any specific assignment. BUDGETARY CONSTRAINTS WA will design to meet the budgetary constraints of the City of Sunny Isles Beach. WA will assist the city in establishing the budget, track the project costs through all phases of the work and value engineer the project for maximum value to the city. SCHEDULING We develop flexible project schedules that are based on realistic goals, task identification and interrelationships. We will confirm that each task fits within the overall specific project and target dates and provide for contingencies if needed. PUBLIC OUTREACH We assist our Clients in developing public awareness programs that promote public buy-in to public projects through activities such as forums, open houses, community meetings and public hearings. UNDERSTANDING THE GOALS Our Clients are our best source of information therefore we partner with them to develop realistic goals and expectations that become the cornerstone of a project’s deliverable expectations. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.12 Below is WA’s step-by-step process it undertakes in every municipal mixed-use project. STEP 1: Program Definition/Data Collection For this initial phase, WA will start by assisting the city in identifying the project’s programmatic require- ments. As an integral part of our approach and prior to beginning the conceptual development of the proj- ect, the WA team will sit down with key personnel from the city staff to discuss project goals, as well as the general construction bud- get. During this phase we also propose that the disciplines of me- chanical and elec- trical be involved to ascertain the requirements of the project. Upon completion of this process, the architect shall issue a final program to the city for its review and approv- al. The approved program will form the basis of the Conceptual Design Development. STEP 2: Concept Design Development Prior to the approved final program, WA shall initiate the concept development phase for the project. Pre- liminary conceptual “bubble” floor plans and sketch- es illustrating the general layout and design intent of the new facility shall be developed and presented for review. This exercise will test the program to as- sure that user goals are being met. General building size (100,000 SF+/-), circulation patterns, room adja- cencies, and floor assignments shall be established based on the building type. Upon acceptance of the first preliminary concept, the architect will develop final conceptual drawings and present to the owner for review. With the city’s consent, the architect will incorporate any comments received and re-issue the concept for final approval. The approved conceptu- al designs will form the basis of the development of Construction Documents. STEP 3: Schematic Design Based upon the mutually agreed program and the approved conceptual design drawings, schedule, and general construction budget requirements, WA will prepare Schematic Design Drawings for the city to review and approve. These represent more detailed drawings consisting of floor plans, exterior elevations, sections and other drawings delineating, in general, the design parameters and character of the project. Preliminary discussion and agreement shall also be made as to the general mechanical, and electrical systems, as well as materials, general interior design direction, and other design elements to be incorporated during the Design Development portion of the final Construction Documents. STEP 4: Design Development Based upon the approved Schematic Design Draw- ings, with adjustments authorized by the city in the program schedule or construction budget, WA will further develop the design including the architectur- al, structural, mechanical, and electrical systems as well as preliminary material identification. STEP 5: Construction Documents Based upon approved Design Development draw- ings, outline specifications, schedule, and general construction budget requirements, WA will further develop and complete the Construction Documents for the project. These final documents consist of the final drawings and technical specifications, in suffi- cient detail for the permitting and construction of the project. At the request of the owner, interim milestone submittals can be provided for review by the city. We will prepare budget estimates at 30, 60, 90 and 100 percent of document development DEFINE, DESIGN, DEVELOP, DEPLOY ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.13 IN-HOUSE DESIGN SERVICES WA provides innovative, multi-disciplined design services coupled with practical, cost-effective project man- agement. The firm offers client-oriented, single-source professional services for the new facility project in the following disciplines: Planning/Programming Site Selection Site Analysis Feasibility Analysis Physical Master Planning Facility Programming and Planning Zoning Analysis/Applications Urban Renewal Planning Pre-Design Services Space Programming Project Programming Design Criteria Studies Existing Conditions Surveys Promotional Concepts Liaison Services Architectural Design Architectural Analysis/Reports Architectural Concept Schematic Design Design Development Construction Documents Design Criteria Cost Estimating Historic Restoration Program Management Interior Planning/Design Programming and Space Planning Contract Interior Design Furnishings, Fixtures and Equipment Graphic Design and Signage Industrial Color Concepts Interior Renovations Engineering Design Engineering Analysis/Reports Electrical Engineering Mechanical Engineering Audio/Video Data/Communications HVAC Life Safety/Fire Protection Cogeneration Plants Central Energy Plants Life Cycle Analysis Value Engineering Civil Engineering Site Planning and Design Roadway Design Drainage and Site Utilities Utilities Corridors Sustainability/Energy Management LEED Energy Audits Energy Analysis Energy Retrofit Energy Planning Solar Energy Systems Construction Services Construction Administration Fast-Track Phased Construction Contract Documents Construction Management Purchasing Contract Negotiations Materials Inventory QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.15 QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Recognized for outstanding achievement and project performance, WA has received numerous awards for architectural design and engineering excellence, and throughout the years it has remained committed to the basic precept of quality design and custom- er service. WA has enjoyed continued client growth over the last 37 years, continually adding to its list of new and return clients. What really sets WA apart from the competition is the firm’s ability to provide in-house architecture and sustainability design; as well as mechanical, electri- cal, plumbing and civil engineering disciplines and in- terior design services. The firm continues to meet its commitments with an exceptional balance between architectural and engineering expertise. The firm’s staff consists of dedicated professional, technical and support personnel with the related mixed-use community facility experience needed for this con- tract. The City of Sunny Isles Beach is guaranteed to have the firm’s management involved in all levels of the decision-making process, providing professional responsiveness and design guidance. The in-house team assigned to the project will remain committed for its duration. WA understand that in achieving well-designed buildings and systems, there must be an inherent balance between creative architecture, sound en- gineering and energy conservation. A commitment to such integrated balance allows the firm to deliver meaningful designs that function and work. Our ex- perience encompasses a wide array of project types, sizes and complexities. The firm’s experience in designing a diverse range of projects has given WA an intimate understanding of the specialized design solutions required for this type of project. Our architects and designers strive to accommodate the diverse activities which may occur within buildings including functional and flex- ible design solutions, state-of-the-art computerized handling systems and integrated air quality-control systems. Interiors are planned in the minutest detail to maximize efficiency and comfort. At WA, we are proud to offer clients a cohesive, solu- tion-oriented professional team with a proven track record in creating lasting designs. In response to the continuing demand for integrated and collaboration of our architecture and engineering services, our organization promotes synergy of design and inte- gration of disciplines as the core of its business. Our philosophy of total commitment to clients has not changed. We are committed to the premise of total customer service and pride ourselves in our ability to deliver. In-House Architectural and Engineering Design The architectural team offers comprehensive plan- ning, architectural and interior design services for a wide range of public and private clients. They are dedicated to achieving design excellence by tailoring designs to suit each client’s needs. What drives us is the client’s program, functionality, sustainability, cost effectiveness and aesthetics. Interdisciplinary collaboration early in the design pro- cess is critical to maximize sustainability opportuni- ties. Our architects and engineers work side-by-side from the inception of a project to develop innovative THE 411 Contact: Marcel Morlote, R.A., Sr. VP Location: 3225 Aviation Ave., Ste. 400 Miami, FL 33133 Phone: 305-666-5474 Web: www.wolfbergalvarez.com Staff: Total number: 29 Licensed Architects: 5 Licensed Engineers: 6 LEED AP: 3 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.16 and creative solutions to achieve a high level of effi- ciency, sustainability and design success. Some of WA’s more notable South Florida projects include: • Broward County Regional Library • Town of Miami Lakes Government Center • Mary Brickell Village • Camillus House Center • Institute of Contemporary Art MIAMI • Braman Automotive Showroom • Federal Bureau of Prisons A dynamic firm with talent, ex- pertise, and experience, WA is one of the most re- spected MEP firms in South Florida. The firm’s expertise includes cen- tral plants, util- ity distribution, sustainable design, indoor air quality, and code compliance and enables us to produce comprehensive programming, feasibility studies, renovations, and new facility designs. WA’s portfolio includes pre-conditioned air, thermal en- ergy storage, LEED compliant sustainable building systems, low temperature air distribution, computer power distribution, heat pipe and desiccant systems for humidity control and the latest technology in light- ing, controls, and air filtering systems. The firm has provided comprehensive civil and util- ity design services on roadways, intersections and highways for local, state and federal agencies for the past 37 years. WA is proud to offer clients a cohe- sive, solution-oriented professional team with a prov- en track record in civil engineering and utility design. In response to the continuing demand for integrated and collaboration of our engineering services, our organization promotes synergy of design and inte- gration of disciplines as the core of its business. WA’s experience runs the full spectrum of civil engi- neering including traffic calming, signalization, light- ing, pavement marking, channelization roadway de- sign and improvements. Because WA has in-house services in both engineering and architecture this has allowed the firm to also design all civil related services for its projects that require creative engi- neering solutions. Construction Administration WA sets itself apart by offering a seamless transi- tion from the planning and design process through construction administration services and will apply its “Best Practices” on the new mixed-use facility as well. The firm offer clients continuity in project man- agement, as well as in-house senior professionals in all disciplines. After approvals, WA has an in-house multidisciplinary design team in place to efficient- ly move into design and construction documents. Established checks and balances across in-house disciplines eases the flow of communication and in- formation, which is critical to produce complete and accurate documents, reports, and cost estimates. Being a full-service firm, WA has the added expertise to manage the construction of projects with experi- enced, in-house construction administration staff. This is very beneficial to clients because it provides a smooth line of communication and project progress where WA designers, engineers, and construction Institute of Contemporary Art MIAMI Chiller plant at Miami International Airport ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.17 personnel are all in harmonious concert which in our experience provides exceptional value to our clients. WA + Client = Partnership Since its inception, WA has striven to create archi- tecture that is dynamic in form and responsive in function. The firm has built its considerable reputa- tion by partnering with the client, designing buildings and spaces that fulfill the needs of the user and at the same time provide the timeless aesthetic qualities that reach beyond everyday expectations. The common thread that runs throughout the his- tory of WA is the ability and willingness to part- ner with our clients. We firmly believe that this attribute is absolutely essen- tial to the success of any project and are resolute in our adherence to the idea that the clients vision of the project is of paramount importance. Today we are a firm of professionals with a broad range of experience and expertise. Our design and management team made up of architects and en- gineers who have evolved from within the firm. We make up a multi-disciplined team of design profes- sionals with a depth and a diversity of experience that allows us to successfully address a wide variety of project types. Regarded in the architectural com- munity as a high profile design firm, WA has multiple award winning buildings. We also pride ourselves in our ability to assemble the best and most appropriate team of consultants for every project. Our ability to understand the special needs of each particular design problem has lead us to build an impressive roster of specialty consultants that we can bring to the design table. Ability to Perform and Meet Schedules With a breadth of resources under one roof, WA is able to adhere to any schedule mandated by the city. WA’s success is based on both the hands-on approach taken by the principals and associates to- gether with the integration of its disciplines in the de- livery of successful solutions. In addition, all projects are subjected to a rigorous in-house Quality Control Program that spans the life of the project. It is this constant attention to client and project needs that has resulted in WA’s proven track record of consis- tent on-time and within-budget project delivery. Sustainability WA feels that every project should take into account any effort to institute “Green Building” principals and waste reduction. The has provided comprehensive LEED advisory services, which entailed detailed involvement in a project from initiation through ac- ceptance and initial occupancy. As consultants, WA guides the Team towards sustainable options across all site, water, energy and materials categories. From its initial concept, the firm actively participates throughout the project to ensure that the owner’s goals are defined, managed and met in the most cost-effective way possible. “Green Design” and Sustainable Developments” are common practice for the firm, as we have participat- ed in several LEED Certified projects, from entire Broward County Regional Library ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.18 campuses to schools to renovations. This is a task that is given importance and commences very ear- ly in the design process. It is an assignment which is very effective at WA as our in-house mechanical, plumbing and electrical engineers expedite this pro- cess. This unique collection of design professionals, under one roof, facilitates the interaction of ideas and options, resulting in the incorporation of the best design concepts and systems. WA has LEED accredited design professionals in all of our disciplines. These are individuals with ex- tensive experience in sustainable designs and pro- fessionals who have successfully worked together in the past to achieve the highest levels in energy conservation and sustainable principals. WA will guide the team towards selecting the most appropriate (i.e. cost effective, sustainable) materi- als and systems that will achieve the target sustain- ability goals and maintain optimal air quality. WA will provide the stakeholders with appropriate specifica- tion language and will participate during the submit- tal process to ensure that the owner’s intent is met with the most appropriate products and systems. WA’s recent LEED Gold Certifications include: • Town of Miami Lakes Government Center • City of Doral Public Works Facility • City of Miami Beach Property Man- agement Facility • Camillus House Center • Sheppard’s Court • U.S. Coast Guard Housing Technology Resources Our team offers a depth and breadth of expertise based on years of experience, talent and innovation. Applying state-of-the-art technologies, WA is com- pletely automated for design, programming, drawing documentation and production, project manage- ment, scheduling, specification and construction administration. WA uses Newforma Project Center which is a file manager and email manager that com- bines all project related correspondents in one place to reduce risk and save time in the management of email, searches, markups, meeting minutes, project files, record documents, images, file transfers, action items and more. WA has the capability of establishing project specif- ic FTP/Client Portal sites for specific projects. The FTP Site can be used as a depository for plans, re- ports and calculations for the purpose of providing secured access to the city, the WA Team and con- sultants working for the city. A Client Portal in New- forma is not just a depository of plans, calculations and reports, but it can also be a management tool for the city. The Portal can be set up to provide no- tices to the city when a permit application has been submitted, when regulatory agency RFI’s have been received and when the consultant response was is- sued. In addition, project schedules can be posted to the portal as well. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.19 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.20 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.21 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.22 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.23 FIRM LICENSES ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.24 KEY PERSONNEL LICENSES ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.25 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.26 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.27 NAME TITLE YRS WITH FIRM % ASSIGN. TO PROJ. WOLFBERG ALVAREZ Julio E. Alvarez, P.E.President 37 10% Marcel Morlote, R.A.Senior Vice President 35 50% Aris Garcia, R.A.Vice President 28 35% Rafael Labrada, R.A., LEED AP Project Architect 15 20% Zack Wethington, AIA, LEED AP Project Architect 3 40% Jose Fortuno, R.A.Project Architect 1 40% Cesar Herran, P.E., LEED AP Dir. of Mechanical Engineering 3 25% Javier Llavona, P.E.Dir. of Electrical Engineering 3 35% Jorge Maldonado, P.E.Dir. of Civil Engineering 16 25% Raul Estevez Vice President 29 15% Armando Rodriguez Mechanical Engineering 28 35% Adrian Rajkumar Plumbing Engineering 1 30% BLISS & NYITRAY Paul Zilio, P.E.Structural Engineer 28 25% O’LEARY RICHARDS DESIGN ASSOC. Kathy O’Leary, ASLA Landscape Architect 30 20% PROPOSED KEY STAFF Each of the professionals selected to serve on this contract have specific design experience with public mixed-use projects and more importantly the synergy of a long-standing working relationship. WA will provide architecture, LEED, mechanical, electrical, plumbing and civil engineering services and our consultant, Bliss & Nyitray who will provide structural engineering services and who is currently working with WA on several other projects. O’Leary Richards Design Associates is the landscape architect which has work with WA for more than 20 years. Based on the design team’s substantial experience with public/civic projects and working together, our man- agement structure has been specifically tailored to provide the communication, expertise, administrative and technical capabilities and the talent necessary to effectively address all of the critical areas identified in the scope of services, while ensuring flexibility to efficiently address and execute the RFQ. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.28 TEAM ORGANIZATIONAL CHART PROJECT MANAGER ARCHITECTURE SUB-CONSULTANTS ENGINEERINGQUALITY CONTROL Project Architects Aris Garcia, R.A. Rafael Labrada, R.A. LEED AP Zack Wethington, AIA, LEED AP Jose Fortuno, R.A. Jose Texidor David Vazquez Construction Administration Jose Fortuno Carlos Flores Mechanical Engineering Cesar Herran, P.E., LEED AP Armando Rodriguez Electrical Engineering Javier Llavona, P.E. Maria Toledo Plumbing/Fire Protection Adrian Rajkumar Structural Engineering BLISS & NYITRAY Paul Zilio, P.E. Landscape Architecture O’LEARY RICHARD DESIGN ASSOCIATES Kathy O’Leary, ASLA MARCEL MORLOTE, R.A. Raul Estevez PRINCIPAL-IN-CHARGE Julio E. Alvarez, P.E. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.29 JULIO E. ALVAREZ, P.E. Principal-in-Charge Education Bachelor of Science Electrical Engineering University of Miami, 1969 Registration Florida No. 14595 MUNICIPAL PROJECT EXPERIENCE Broward County Northwest Regional Library, Coral Springs, FL New 72,000 SF regional library for Broward County. The building is a two-story, concrete structure with “public” areas defined in the first floor, encompass- ing areas for children’s reading, children’s workshop, and teen/young adult’s area. Town of Miami Lakes Government Center, Miami Lakes, FL New 25,000 SF government center to house executive and administrative offices, council chamber, public safety department and ancillary functions and a parking lot for 100 parking spaces. Serves as Emergency Operations Center. The building was also carefully de- signed for future expansion and achieved LEED Gold. Village of Pinecrest Municipal Center, Pinecrest, FL Programming, planning, architectural and engineering services. The building serves as the Village’s seat of gov- ernment, and houses the Village’s Building and Zoning Department, as well as their fully accredited Police Sta- tion. Provisions for emergency self-sustainability. Florida City Youth Community Center, Florida City, FL Planning and design services for a new 21,500 SF youth activity and community center for the City of Florida City. The center features a wide range of activities for special- ized uses including an indoor basketball gym with folding bleachers that seat 240 people. Doral Public Works Facility, Doral, FL A new vehicle maintenance and public works facility housing approxi- mately 30,000 SF including a vehicle service bays, wash and fueling facility to accommodate 6 trolleys and approx. 120 vehicles. Project to be LEED Silver. Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan and 5,000 SF tennis center for the City of Miami Beach at historic Flamingo Park. The new tennis center will have 17 hydro grid courts, a new restroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. Coral Gables Maintenance and Administration Facil- ity, Coral Gables, FL A/E services for a new 42,500 SF multi-use, multi-level maintenance and storage facility to accommodate the City’s fleet maintenance and storage operations. Fire Rescue Headquarters and Administration Build- ing, Ft. Lauderdale, FL A/E design services of a new 32,000 SF Fire Station and Administration Building lo- cated in Downtown Ft. Lauderdale. The new three-story facility combined two existing fire and rescue stations and houses the administrative offices for the City. South Miami Heights Maintenance Facility, South Miami, FL A/E design services for the development of a new Miami-Dade Water and Sewer Department Mainte- nance. The facility to be built on a 17.5 acre site consists of approximately 126,000 SF of new construction encom- passing administration offices, maintenance shops, ware- house and storage areas and a maintenance garage. Village of Palmetto Bay Community Center and Li- brary, Palmetto Bay, FL New 9,000 SF Library and com- munity center that also functions as a neighborhood park for special events, and includes an environmentally-ori- ented park on Biscayne Bay. Suniland Park and Community Center, Pinecrest, FL 10-acre active park with multipurpose athletic fields, a mixed-use community center for senior activities, basket- ball courts, Wi-Fi Spot and a tot lot. Evelyn Greer Park and Community Center, Pinecrest, FL New 10-acre award-winning park that includes two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with fitness stations, a covered shelter and a 5,000 SF community center consisting of an activity room, public restrooms, administrative park of- fices, a snack shop, a large recreation shelter for public gatherings, a covered children’s playground, and parking for 140 vehicles. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.30 ARIS GARCIA, R.A. Project Architect Education Bachelor of Science Architecture University of Miami, 1983 Registration Florida No. AR 15263 MUNICIPAL PROJECT EXPERIENCE Broward County Northwest Regional Library, Coral Springs, FL New 72,000 SF regional library for Broward County. The building is a two-story, concrete structure with “public” areas defined in the first floor, encompass- ing areas for children’s reading, children’s workshop, and teen/young adult’s area. Town of Miami Lakes Government Center, Miami Lakes, FL New 25,000 SF government center to house executive and administrative offices, council chamber, public safety department and ancillary functions and a parking lot for 100 parking spaces. Serves as Emergency Operations Center. The building was also carefully de- signed for future expansion and achieved LEED Gold. Village of Pinecrest Municipal Center, Pinecrest, FL Programming, planning, architectural and engineering services. The building serves as the Village’s seat of gov- ernment, and houses the Village’s Building and Zoning Department, as well as their fully accredited Police Sta- tion. Provisions for emergency self-sustainability. Florida City Youth Community Center, Florida City, FL Planning and design services for a new 21,500 SF youth activity and community center for the City of Florida City. The center features a wide range of activities for special- ized uses including an indoor basketball gym with folding bleachers that seat 240 people. Doral Public Works Facility, Doral, FL A new vehicle maintenance and public works facility housing approxi- mately 30,000 SF including a vehicle service bays, wash and fueling facility to accommodate 6 trolleys and approx. 120 vehicles. Project to be LEED Silver. Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan and 5,000 SF tennis center for the City of Miami Beach at historic Flamingo Park. The new tennis center will have 17 hydro grid courts, a new restroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. Coral Gables Maintenance and Administration Facil- ity, Coral Gables, FL A/E services for a new 42,500 SF multi-use, multi-level maintenance and storage facility to accommodate the City’s fleet maintenance and storage operations. Fire Rescue Headquarters and Administration Build- ing, Ft. Lauderdale, FL A/E design services of a new 32,000 SF Fire Station and Administration Building lo- cated in Downtown Ft. Lauderdale. The new three-story facility combined two existing fire and rescue stations and houses the administrative offices for the City. South Miami Heights Maintenance Facility, South Miami, FL A/E design services for the development of a new Miami-Dade Water and Sewer Department Mainte- nance. The facility to be built on a 17.5 acre site consists of approximately 126,000 SF of new construction encom- passing administration offices, maintenance shops, ware- house and storage areas and a maintenance garage. Village of Palmetto Bay Community Center and Li- brary, Palmetto Bay, FL New 9,000 SF Library and com- munity center that also functions as a neighborhood park for special events, and includes an environmentally-ori- ented park on Biscayne Bay. Suniland Park and Community Center, Pinecrest, FL 10-acre active park with multipurpose athletic fields, a mixed-use community center for senior activities, basket- ball courts, Wi-Fi Spot and a tot lot. Evelyn Greer Park and Community Center, Pinecrest, FL New 10-acre award-winning park that includes two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with fitness stations, a covered shelter and a 5,000 SF community center consisting of an activity room, public restrooms, administrative park of- fices, a snack shop, a large recreation shelter for public gatherings, a covered children’s playground, and parking for 140 vehicles. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.31 MARCEL MORLOTE, R.A. Project Manager Education Bachelor of Science Architecture University of Miami, 1978 Registration Florida No. AR 9564 MUNICIPAL PROJECT EXPERIENCE Broward County Northwest Regional Library, Coral Springs, FL New 72,000 SF regional library for Broward County. The building is a two-story, concrete structure with “public” areas defined in the first floor, encompass- ing areas for children’s reading, children’s workshop, and teen/young adult’s area. Town of Miami Lakes Government Center, Miami Lakes, FL New 25,000 SF government center to house executive and administrative offices, council chamber, public safety department and ancillary functions and a parking lot for 100 parking spaces. Serves as Emergency Operations Center. The building was also carefully de- signed for future expansion and achieved LEED Gold. Village of Pinecrest Municipal Center, Pinecrest, FL Programming, planning, architectural and engineering services. The building serves as the Village’s seat of gov- ernment, and houses the Village’s Building and Zoning Department, as well as their fully accredited Police Sta- tion. Provisions for emergency self-sustainability. Florida City Youth Community Center, Florida City, FL Planning and design services for a new 21,500 SF youth activity and community center for the City of Florida City. The center features a wide range of activities for special- ized uses including an indoor basketball gym with folding bleachers that seat 240 people. Doral Public Works Facility, Doral, FL A new vehicle maintenance and public works facility housing approxi- mately 30,000 SF including a vehicle service bays, wash and fueling facility to accommodate 6 trolleys and approx. 120 vehicles. Project to be LEED Silver. Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan and 5,000 SF tennis center for the City of Miami Beach at historic Flamingo Park. The new tennis center will have 17 hydro grid courts, a new restroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. Coral Gables Maintenance and Administration Facil- ity, Coral Gables, FL A/E services for a new 42,500 SF multi-use, multi-level maintenance and storage facility to accommodate the City’s fleet maintenance and storage operations. Fire Rescue Headquarters and Administration Build- ing, Ft. Lauderdale, FL A/E design services of a new 32,000 SF Fire Station and Administration Building lo- cated in Downtown Ft. Lauderdale. The new three-story facility combined two existing fire and rescue stations and houses the administrative offices for the City. South Miami Heights Maintenance Facility, South Miami, FL A/E design services for the development of a new Miami-Dade Water and Sewer Department Mainte- nance. The facility to be built on a 17.5 acre site consists of approximately 126,000 SF of new construction encom- passing administration offices, maintenance shops, ware- house and storage areas and a maintenance garage. Village of Palmetto Bay Community Center and Li- brary, Palmetto Bay, FL New 9,000 SF Library and com- munity center that also functions as a neighborhood park for special events, and includes an environmentally-ori- ented park on Biscayne Bay. Suniland Park and Community Center, Pinecrest, FL 10-acre active park with multipurpose athletic fields, a mixed-use community center for senior activities, basket- ball courts, Wi-Fi Spot and a tot lot. Evelyn Greer Park and Community Center, Pinecrest, FL New 10-acre award-winning park that includes two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with fitness stations, a covered shelter and a 5,000 SF community center consisting of an activity room, public restrooms, administrative park of- fices, a snack shop, a large recreation shelter for public gatherings, a covered children’s playground, and parking for 140 vehicles. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.32 RAUL ESTEVEZ Engineering Coord./Quality Control Education Completed course work toward BS in Mechanical Engi- neering, as well as specialized courses related to Value Engineering, Construction Management, HVAC Engi- neering and Energy Management Systems. MUNICIPAL PROJECT EXPERIENCE Broward County Northwest Regional Library, Coral Springs, FL New 72,000 SF regional library for Broward County. The building is a two-story, concrete structure with “public” areas defined in the first floor, encompass- ing areas for children’s reading, children’s workshop, and teen/young adult’s area. Town of Miami Lakes Government Center, Miami Lakes, FL New 25,000 SF government center to house executive and administrative offices, council chamber, public safety department and ancillary functions and a parking lot for 100 parking spaces. Serves as Emergency Operations Center. The building was also carefully de- signed for future expansion and achieved LEED Gold. Village of Pinecrest Municipal Center, Pinecrest, FL Programming, planning, architectural and engineering services. The building serves as the Village’s seat of gov- ernment, and houses the Village’s Building and Zoning Department, as well as their fully accredited Police Sta- tion. Provisions for emergency self-sustainability. Florida City Youth Community Center, Florida City, FL Planning and design services for a new 21,500 SF youth activity and community center for the City of Florida City. The center features a wide range of activities for special- ized uses including an indoor basketball gym with folding bleachers that seat 240 people. Doral Public Works Facility, Doral, FL A new vehicle maintenance and public works facility housing approxi- mately 30,000 SF including a vehicle service bays, wash and fueling facility to accommodate 6 trolleys and approx. 120 vehicles. Project to be LEED Silver. Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan and 5,000 SF tennis center for the City of Miami Beach at historic Flamingo Park. The new tennis center will have 17 hydro grid courts, a new restroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. Coral Gables Maintenance and Administration Facil- ity, Coral Gables, FL A/E services for a new 42,500 SF multi-use, multi-level maintenance and storage facility to accommodate the City’s fleet maintenance and storage operations. Fire Rescue Headquarters and Administration Build- ing, Ft. Lauderdale, FL A/E design services of a new 32,000 SF Fire Station and Administration Building lo- cated in Downtown Ft. Lauderdale. The new three-story facility combined two existing fire and rescue stations and houses the administrative offices for the City. South Miami Heights Maintenance Facility, South Miami, FL A/E design services for the development of a new Miami-Dade Water and Sewer Department Mainte- nance. The facility to be built on a 17.5 acre site consists of approximately 126,000 SF of new construction encom- passing administration offices, maintenance shops, ware- house and storage areas and a maintenance garage. Village of Palmetto Bay Community Center and Li- brary, Palmetto Bay, FL New 9,000 SF Library and com- munity center that also functions as a neighborhood park for special events, and includes an environmentally-ori- ented park on Biscayne Bay. Suniland Park and Community Center, Pinecrest, FL 10-acre active park with multipurpose athletic fields, a mixed-use community center for senior activities, basket- ball courts, Wi-Fi Spot and a tot lot. Evelyn Greer Park and Community Center, Pinecrest, FL New 10-acre award-winning park that includes two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with fitness stations, a covered shelter and a 5,000 SF community center consisting of an activity room, public restrooms, administrative park of- fices, a snack shop, a large recreation shelter for public gatherings, a covered children’s playground, and parking for 140 vehicles. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.33 RAFAEL LABRADA, R.A., LEED AP/Project Architect Education Bachelor of Architecture Florida International University 1997 Registration Florida No. AR92404 MUNICIPAL PROJECT EXPERIENCE Village of Palmetto Bay Community Center and Li- brary, Palmetto Bay, FL New 9,000 SF Library and com- munity center that also functions as a neighborhood park for special events, and includes an environmentally-ori- ented park on Biscayne Bay. Broward County Northwest Regional Library, Coral Springs, FL New 72,000 SF regional library. Two-stories, with “public” areas defined in the first floor, encompass- ing areas for children’s reading, children’s workshop, and teen/young adult’s area. U.S. Coast Guard Housing, Grassy Key, FL New hous- ing consisting of 11 LEED Certified residential housing units. Completed in three phases the development in- cludes four- and three-bedroom single family detached dwellings in a “duplex” configuration. Suniland Park and Community Center, Pinecrest, FL 10-acre active park with multipurpose athletic fields, a mixed-use community center for senior activities, basket- ball courts, Wi-Fi Spot and a tot lot. Evelyn Greer Park and Community Center, Pinecrest, FL New 10-acre award-winning park that includes two soccer fields, two softball fields, batting cages, a tot lot, perimeter jogging path with fitness stations, a covered shelter and a 5,000 SF community center consisting of an activity room, public restrooms, administrative park of- fices, a snack shop, a large recreation shelter for public gatherings, a covered children’s playground, and parking for 140 vehicles. Florida City Youth Community Center, Florida City, FL New 21,500 SF youth activity and community center featuring a wide range of activities for specialized uses including an indoor basketball gym with folding bleach- ers that seat 240. The buildings surround a secure open courtyard in which social activities and other events can take place. City of Miami Virrick Park Pool, Miami, FL Scope in- cludes demolition and construction of a new pool building facility within the existing footprint. Building includes ad- ministration, bath house, concession stand, smaller pool and a splash playground. Ocean Reef Cultural and Community Center, Key Lar- go, FL The organization of the primary functional spac- es was developed to allow independent operation of the Theater and Reception & Banquet Hall, the Historical Mu- seum, the Library, and the Meeting Rooms. These spac- es are accessible from each other via covered walkways that encircle the central courtyard. Independent entranc- es allow maximum flexibility for hours of operation and security measures. Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan for the 36-acre park and a new 5,000 SF tennis center for the historic park. The new tennis center will have 17 hydro grid courts, a new re- stroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. City of Miami Beach Property Management Facility, Miami Beach, FL New property management facility to included administrative offices, workshops, inventory warehouse, oversized vehicle parking, hazardous mate- rial storage, loading area and an emergency generator. Florida International University Continuing Services Contract for Architecture, Miami, FL Project architect for an architectural/engineering Indefinite Quantity Con- tract for all of FIU’s campuses. Individual work orders un- der $1M in construction cost. To date, diverse projects consisted of gymnasium locker room renovations, emer- gency structural upgrades to a partially collapsed building to exterior window replacement and elevator upgrades. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.34 ZACH WETHINGTON, AIA LEED AP/Project Architect Education Bachelor of Science Architecture University of Kentucky 1997 Registration Florida No.AR095553 MUNICIPAL PROJECT EXPERIENCE Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan for the 36-acre park and a new 5,000 SF tennis center for the historic park. The new tennis center will have 17 hydro grid courts, a new re- stroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. City of Doral Public Works Facility, Doral, FL New ve- hicle maintenance and public works facility for the City of Doral. The two story facility is approximately 31,527 SF including a vehicle wash and fueling facility to accom- modate six municipal trolleys and approximately 120 city owned vehicles. Administrative offices includes about 12,286 SF of offices, storage, break rooms, distribution center, and other support areas. The vehicle maintenance wing has garage services bays for trolleys, city owned ve- hicles, and a bay for tire storage and repair. City of Miami Virrick Park Pool, Miami, FL Scope in- cludes demolition and construction of a new pool building facility within the existing footprint. Building includes ad- ministration, bath house, concession stand, smaller pool and a splash playground. City of Miami Parks and Recreation, Miami, FL WA per - formed improvements and upgrades to 17 parks through- out the City. The scope of work included site adaptation, master planning, and other site related services for ath- letic facilities and park design of football, soccer, baseball and softball fields, sports lighting, including bleachers, dug-outs, batting cages, sport lighting and field events such as high jump and pole vault etc. City of Miami Hadley Park Youth Center, Miami, FL A new community youth center located in Charles Had- ley Park for the City of Miami. The project will consist of classroom spaces, meeting rooms, administrative offices, computer lab, basketball gymnasium for 2,500 people and weight room. The project is seeking LEED Silver Ac- creditation from the USGBC. South Miami Heights Maintenance Facility, South Miami, FL A/E design services for the development of a new Miami-Dade Water and Sewer Department Mainte- nance. The facility to be built on a 17.5 acre site consists of approximately 126,000 SF of new construction encom- passing administration offices, maintenance shops, ware- house and storage areas and a maintenance garage. City of Miami Beach Property Management Facility, Miami Beach, FL New property management facility to included administrative offices, workshops, inventory warehouse, oversized vehicle parking, hazardous mate- rial storage, loading area and an emergency generator. City of Miami Fire Station #13, Miami, FL New 11,000 SF facility will be the first LEED Silver Fire Station in South Florida serving the Northern Boundary of the City of Miami. This Emergency Facility has been design above current Codes and able to resist the winds of a Category 5 Hurricane and has a back-up power system able to run non-stop for 7 days without power in-case of a natural disaster. This project is currently of for Bid. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.35 CESAR HERRAN, P.E. LEED AP Director of Engineering Education Bachelor of Science Mechanical Engineering University of Havana (ISPJAE) 1989 Registration FL-No. 71524 MUNICIPAL PROJECT EXPERIENCE Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan for the 36-acre park and a new 5,000 SF tennis center for the historic park. The new tennis center will have 17 hydro grid courts, a new re- stroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. City of Miami Virrick Park Pool, Miami, FL Scope in- cludes demolition and construction of a new pool building facility within the existing footprint. Building includes ad- ministration, bath house, concession stand, smaller pool and a splash playground. City of Miami Parks and Recreation, Miami, FL WA per - formed improvements and upgrades to 17 parks through- out the City. The scope of work included site adaptation, master planning, and other site related services for ath- letic facilities and park design of football, soccer, baseball and softball fields, sports lighting, including bleachers, dug-outs, batting cages, sport lighting and field events such as high jump and pole vault etc. South Miami Heights Maintenance Facility, South Miami, FL A/E design services for the development of a new Miami-Dade Water and Sewer Department Mainte- nance. The facility to be built on a 17.5 acre site consists of approximately 126,000 SF of new construction encom- passing administration offices, maintenance shops, ware- house and storage areas and a maintenance garage. City of Doral Public Works Facility, Doral, FL New ve- hicle maintenance and public works facility for the City of Doral. The two story facility is approximately 31,527 SF including a vehicle wash and fueling facility to accom- modate six municipal trolleys and approximately 120 city owned vehicles. Administrative offices includes about 12,286 SF of offices, storage, break rooms, distribution center, and other support areas. The vehicle maintenance wing has garage services bays for trolleys, city owned ve- hicles, and a bay for tire storage and repair. City of Miami Beach Property Management Facility, Miami Beach, FL New property management facility to included administrative offices, workshops, inventory warehouse, oversized vehicle parking, hazardous mate- rial storage, loading area and an emergency generator. Roberto Clemente Park Community Center, Miami, FL HVAC feasibility study for an existing building. Project included HVAC design development documents and 100% construction and Leed documents. Thermal load calculations, state energy calculations, static pressure and ventilation calculations, equipment selection, air distribution layout and detailing for a 12,000 to 8,000 SF new single story building was provided. All Leed documents have been uploading as required to achieve Gold Building Construction Certification. Florida International University, Baseball Stadium, Press Boxes, Miami, FL New press box, press/work room and offices, splits units and condensing units DX with capacity of 5TN & 7.5TN to serve the 2,100sf area. The space also includes a small telecommunication room with a ductless split unit of 1.5 tons. Florida International University, Chiller Plant Opera- tion, North Campus, Miami, FL Mechanical Engineer for the change of sequence of operations on the chiller plant to include the addition of pumps on primary and second- ary loops monitored by BMS. U.S. Department of Justice Building Renovations, Miami, FL Mechanical Engineer for the HVAC and fire protection design and construction documents for a 7,500 sf renovation of office space on the 2nd floor. University of Miami, Pavia Street Parking Garage Expansion, Coral Gables, FL Mechanical Engineer for the design, calculations and construction documents for the Fire Protection project of 180,000 sf parking garage. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.36 JAVIER LLAVONA, P.E. Electrical Engineering Education Bachelor of Science Civil Engineering Florida International University 1997 Registration Florida No. 58684 RELEVANT PROJECT EXPERIENCE Flamingo Park Master Plan and Tennis Center, Miami Beach, FL New master plan for the 36-acre park and a new 5,000 SF tennis center for the historic park. The new tennis center will have 17 hydro grid courts, a new re- stroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fencing, landscaping and shade trees along pedestrian promenades. City of Miami Virrick Park Pool, Miami, FL Scope in- cludes demolition and construction of a new pool building facility within the existing footprint. Building includes ad- ministration, bath house, concession stand, smaller pool and a splash playground. City of Miami Parks and Recreation, Miami, FL WA per - formed improvements and upgrades to 17 parks through- out the City. The scope of work included site adaptation, master planning, and other site related services for ath- letic facilities and park design of football, soccer, baseball and softball fields, sports lighting, including bleachers, dug-outs, batting cages, sport lighting and field events such as high jump and pole vault etc. Camillus House Center, Miami, FL The new 215,000 SF Camillus House Center sits on a 3.1 acre site with a campus style environment. The complex includes 340 beds, and the most complete range of social and clinical services available in South Florida to serve an estimat- ed 4,300 people a year. The buildings are equipped with state-of-the-art biometric security systems and include administrative offices, meeting and instructional rooms for the assessment of clients. The project includes a sev- en level 280 car parking garage and has received LEED Gold certification. South Miami Heights Maintenance Facility, South Miami, FL A/E design services for the development of a new Miami-Dade Water and Sewer Department Mainte- nance. The facility to be built on a 17.5 acre site consists of approximately 126,000 SF of new construction encom- passing administration offices, maintenance shops, ware- house and storage areas and a maintenance garage. Doral Public Works Facility, Doral, FL Project architect for a new vehicle maintenance and public works facili- ty housing approximately 30,000 SF including a vehicle service bays, wash and fueling facility to accommodate 6 trolleys and approx. 120 vehicles. The project received LEED Gold Certification. Braman Automotive Parking Garage and Showroom, Miami, FL New seven-level, 500,000 SF parking garage for 1,600 cars. Showrooms are located on the ground floor and partial second floor with a combined area of ap- proximately 90,000 SF. An interior, monumental stair is strategically located to entice and facilitate access to the second floor showroom. Project was approved for Miami 21. The Palms Hotel Parking Garage, Miami Beach, FL New parking garage with five-levels and 300 vehicle spaces. Due to proximity to the ocean special consider- ation was given when choosing the materials. Publix 84 and Parking Garage, Coral Gables, FL A new 58,000 SF Publix Super Market with five-levels of inte- grated parking for 809 vehicles. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.37 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.38 ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.39 O’Leary Richards Design Associates, Inc. Landscape Architecture & Planning KATHRYN O’LEARY, RLA, ASLA, LEED GA Project Manager/Senior Landscape Architect EDUCATION:   BLA  University of Florida, 1985   College of Architecture and Fine Arts  Department of Landscape Architecture     PROFESSIONAL EXPERIENCE:  O’Leary Richards Design Associates, Inc.  Landscape Architecture & Planning  November 2002‐ Present (President)  O’Leary Design Associates, PA  Landscape Architects & Land Planners   1993 – 2002, 1985‐1987   Wallace Roberts & Todd  Architects and Landscape Architects  August, 1987 ‐ August, 1993                                          PROFESSIONAL REGISTRATION:  Landscape Architect (Florida) #0001317    PROFESSIONAL AFFILIATIONS:  American Society of Landscape Architects           International Society of Arboriculture  LEED GA (* indicates LEED Projects below)       SELECT EXPERIENCE:  General Landscape Arch. Consulting Services:  City of Aventura, City of Sunny Isles Beach,  Town of Golden Beach , Bal Harbour Village,  City of Coral Springs, City of Doral, Village of  Palmetto Bay, Village of Pinecrest, City of Miami  Gardens, FDOT    Municipal/Government:  Palmetto Bay Municipal Ctr., Palmetto Bay, FL*  Flamingo Park Tennis Center, Miami Beach, FL  City of Miami Fire Sta. No. 11, Miami, FL  North, South & Singer Parks, Golden Beach, FL  Evelyn Greer Park, Pinecrest, FL  Founders Park, Aventura, FL  Village Green, Key Biscayne, FL  Hadley Park Senior Center, Miami, FL  Sunrise Park, Coral Gables, FL  Waterways Park, Aventura, FL  Oceanfront Park, Sunny Isles Beach, FL  Town Center Park, Sunny Isles Beach, FL  Chuck Pezoldt Park, Miami, FL  Liberty City Health Clinic, Miami, FL  Doral Public Works Maint. Facility, Doral, FL *  Various Miami‐Dade County Public Schools    Streetscapes:  Miracle Mile, City of Coral Gables, FL  Aventura Boulevard Streetscape, Aventura, FL  Williams Island Boulevard, Aventura, FL  N.E. 190th St., 207th St., 191st St., 185th St., 213th St.,  188th St. Landscape, Aventura, FL  Biscayne Boulevard Streetscape, Aventura, FL  Collins Avenue Streetscape, Bal Harbour, FL  Crandon Blvd. Streetscape, Key Biscayne, FL  Country Club Drive Landscape, Aventura, FL  Collins Ave. Streetscape, Sunny Isles Beach, FL  Country Walk St. Tree Master Plan, Miami, FL  Doral Street Tree Master Plan, City of Doral, FL  Palmetto Bay St. Tree Master Plan, Palmetto Bay, FL  Hurricane Landscape Restoration, Aventura, FL  NW 7th Avenue Streetscape, Miami Gardens, FL    FDOT Roadway Landscapes:  US‐1/Cardsound Road to SW 304th St, Homestead,FL  US‐1 Exclusive Bus Lanes, Dade County, FL  US‐1 from S.W. 37th Avenue to I‐95, Miami, FL  US‐1 from SW 136th St. to C‐2 Canal, Pinecrest, FL  S.R. 826 Landscape Improvements, Miami, FL  Big Cypress Nat’l Park Rest Area, Collier County,FL  S.R. 811 Landscape, Wilton Manors, FL  S.R. 5, Biscayne Blvd. from N.E. 87th Street to   N.E. 121st Street, Miami, FL  S.R. 845, Powerline Road, Broward Co., FL  S.R. 860, Miami Gardens Drive, Miami, FL  SR 862/Eller Dr. Exp. Connector, Ft. Lauderdale, FL   FDOT District 4 Landscape Plan Review    Commercial:  The Miami Herald, Doral, FL  Smathers Four Fillies Farm, Village of Pinecrest, FL  Mercedes‐Benz of Cutler Bay, Cutler Bay, FL  Camillus House Center, Miami, FL*  City Furniture, Cutler Bay, FL*  Sunset Place, South Miami, FL  South Beach Hotel, Miami Beach, FL  Houston’s Restaurant, N. Miami Beach, FL  Ritz Carlton South Beach, Miami Beach, FL  ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.40 City of Miami Beach Flamingo Park Master Plan and Tennis Center Property Management Facility Thais Vieira, Project Manager 1700 Convention Center Drive Miami Beach, FL 33139 305-673-7071 thaisvieira@miamibeachfl.gov City of Doral Doral Public Works and Police Facility Rudy de la Torre Director of Construction 8401 NW 53rd Terr. Doral, FL 33166 305-593-6725, ext. 6002 rudy.delatorre@cityofdoral.com City of Florida City Florida City Youth Activity Center Gene Leon Project Manager 404 West Palm Drive Florida City, FL 33034 305-247-8221 proj-mngr@floridacityfl.com REFERENCES The following references are provided for the City of Sunny Isles to review and contact regarding the perfor- mance of WA. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.41 FIRM REFERENCES AND SIMILAR WORK COMPLETED ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.42 FIRM REFERENCES AND SIMILAR WORK COMPLETED Experience With Public Agencies WA has completed numerous local, state and federal governmental proj- ects including the design of administration buildings, mixed-use libraries and community centers, parks, plazas, historical restoration, vehicle main- tenance facilities, police facilities, judicial, detention and public safety proj- ects. Having completed design work for more than 60 related agencies in the United States and Caribbean, the firm understands the needs of public agencies to meet established budgets and schedules, while achieving a functional, secure and well designed facility. WA has provided comprehensive design services in the last 15 years alone totaling more than 157,000,000 SF for a diverse range of public clients including Miami-Dade County, Broward County, Monroe County, Bal Harbour Village, Town of Cutler Bay, Village of Palmetto Bay, Village of Pinecrest, City of Hialeah, City of Miami, City of Miami Beach, City of Doral, Town of Miami Lakes, City of Ft. Lauderdale; and on the State and Federal level, General Services Administration, South Florida Water Management District, NASA, Veterans Administration, State of Florida, Internal Revenue Service, U.S. De- partment of Justice to name a few. NASA Operations Support Building II The criteria used for selection of the following projects was base on mixed-use public projects within the past five years, as well as projects that are very similar in size and use. They also show a style of architecture that reflects the City of Sunny Isles Beach. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.43 NASA OPERATIONS SUPPORT BUILDING II Kennedy Space Center, FL Client NASA Services Programming/Planning Architecture/Interior Design LEED Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $34,000,000 2002-2007 Description WA provided programming, architecture and engineering services and studies for a new 200,000 GSF, Class ‘A’ multi-story support building for NASA and the Space Shuttle launches. Comprised of ultra-mod- ern classrooms and research laboratories the building houses 960 office spaces, a 300-person mission conference cen- ter with observation deck for guests and dignitaries to view lift-offs, training rooms, computer rooms, multi-media conference rooms, technical libraries, snack bar/caf- eteria, storage, internal and external em- ployee break areas, retail, miscellaneous support areas and parking. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.44 BROWARD COUNTY NORTHWEST REGIONAL LIBRARY Coral Spring, FL Client Broward County Services Programming/Planning Architecture/Interior Design Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering Cost Estimating Construction Administration Project Cost Dates $8,600,000 1999-2001 Description The Northwest Regional Library for Broward County, is a 72,000 SF, state-of- the-art facility characterized by its striking shape along a sweeping curve across the entire front of the building creating a bold statement that stands by itself. A strong response was to create it’s own identity with the presence as a “regional library,” in a site shared with another project. The building is a two-story, concrete structure with “public” areas defined in the first floor, encompassing areas for children’s reading, children’s workshop, and teen/young adult’s area. The second floor was designed for more specialized reading, and geared for more mature patrons. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.45 CAMILLUS HOUSE CENTER Miami, FL Client Camillus House CJ Matherne, 305-374-1065, ext. 302 cjmatherne@camillus.org Services Programming/Planning Architecture/Interior Design LEED Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $48,000,000 2007-2015 Description WA provided design and LEED services for the 215,000 SF facility. The 3.1 acre, campus style complex includes 340 beds, and the most complete range of social and clinical services available in South Florida to serve an estimated 4,300 homeless people a year. The buildings are equipped with state-of-the-art biometric security systems and include administrative offic- es, meeting and instructional rooms for the assessment of clients. It also includes a full-service kitchen and dining room that can serve more than 2,000 meals a day and systematically disposes the waste and compartmentalizes recyclables in an effort to minimize the impact on the envi- ronment. A seven level, 280 car parking garage houses an emergency generator on the ground level and cooling tower on the roof top. The project is registered to meet LEED Certification standards. PAST 5 YEARS ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.46 BRAMAN AUTOMOTIVE SHOWROOM Miami, FL Client Braman Management Association Robert Bernstein, (305) 576-1889 robertb@bramanmanagement.com Services Programming/Planning Architecture/Interior Design LEED Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $30,000,000 2013-2015 Description WA has been retained by Braman Motors to provide complete architectural and en- gineering professional design services for a new automotive showroom and vehicle storage facility. The total area of the facility is in excess of 500,000 SF. on seven levels with storage capabilities for 1,600 cars. Showrooms are located on the ground floor and partial second floor with a combined area of approximately 90,000 SF. Initially, the showrooms are for pre-owned BMW’s and new Rolls-Royce cars. An interior, monumental stair is stra- tegically located to entice and facilitate access to the second floor showroom. PAST 5 YEARS ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.47 INSTITUTE OF CONTEMPORARY ART MIAMI Miami, FL Client Norman Braman Services Programming/Planning Architecture/Interior Design LEED Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $ 2015-2017 Description WA is providing architecture and engi- neering services and is the Architect of Record for the new 37,500 SF, three-story contemporary art museum with a 15,000 SF sculpture garden. 6,500 SF is on the first floor, 5,960 SF on the second and 8,000 SF on the third floor. The land was donated by Miami Design District As- sociates, a partnership between Dacra Development’s Craig Robins and L Real Estate. The design and construction will be funded by philanthropists Norman and Irma Braman. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.48 TOWN OF MIAMI LAKES GOVERNMENT CENTER Miami Lakes, FL Client Town of Miami Lakes Mario Gonzalez-Pola, 305-995-4577 mgonzalez-pola@dadeschools.net Services Programming/Planning Architecture/Interior Design LEED Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $4,250,000 2011-2013 Description WA was commissioned to design a new 25,000 SF mixed-use government center to house executive and administrative offices, council chamber, public safety department and ancillary functions and a parking lot for 100 parking spaces. The Town’s police department will be housed at Government Center and will have administrative offices, roll call area, locker area, breakroom and a secured sally port. Security access shall be re- quired for the entire building and individu- al departments. The building was also carefully designed for future expansion and has achieved LEED Gold certification. 8 PAST 5 YEARS ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.49 CITY OF MIAMI BEACH FLAMINGO PARK MASTER PLAN AND TENNIS CENTER Miami Beach, FL Client City of Miami Beach Thais Vieira, 305-673-7071 ThaisVieira@miamibeachfl.gov Services Programming/Planning Architecture/Interior Design Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering Cost Estimating Construction Administration Project Cost Dates $5,378,535 2008-2016 $10,000,000 (complete park) Description WA has been commissioned to provide a new master plan and architecture and engineering services for a new 5,000 SF tennis center for the 33 acre historic Fla- mingo Park. There will be a new tennis center with 17 hydro grid courts, a new restroom building, new handball courts, new tot lot, a new water feature at the center of the park, and new lighting, fenc- ing, landscaping and shade trees along pedestrian promenades. WA conducted design charrettes with citizens of Miami Beach to solicit input on the new master plan. PAST 5 YEARS ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.50 CITY OF DORAL PUBLIC WORKS FACILITY Doral, FL Client City of Doral Rudy de la Torre,Chief of Construction 305-593-6725, rudy.delatorre@cityofdoral.com Services Programming/Planning Architecture/Interior Design Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering Construction Administration Cost Estimating LEED Project Cost Dates $6,000,000 2011-2013 Description The two-story facility is approximately 31,527 SF including a vehicle wash and fueling facility to accommodate six trolleys and approximately 120 city owned vehicles. The administrative portion includes 12,286 SF of offices, storage, break rooms, distribution center, and other support areas. The maintenance area has garage service bays for trolleys, city owned vehicles, and a bay for tire storage and repair. Scope of work included an emergency generator for the entire building with 48 hours of diesel fuel. PAST 5 YEARS ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.51 WYNWOOD MIXED-USE BUILDING AND PARKING GARAGE Miami, FL Client Goldman Properties Services Programming/Planning Architecture/Interior Design LEED Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $ 2013-2016 Description WA is providing architecture and engi- neering service for a new 226,000 SF, eight-story, mixed-use project consisting of 20,000 SF of retail, 23,000 SF of office on the top floor, and 428 parking spaces. In an effort to reflect the distinct round- ed corner feature present on numerous buildings throughout the Wywood District, the Northeast and Southeast corners of the proposed parking garage façade are curved above the sidewalk level. This serves to soften the overall massing of the garage, and maintains and promotes an important urban contextual feature unique to the legacy of this neighborhood. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.52 VILLAGE OF PALMETTO BAY LIBRARY AND COMMUNITY CENTER AT LUDOVICI PARK Palmetto Bay, FL Client Village of Palmetto Bay Services Programming/Planning Architecture/Interior Design Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $3,122,000 2006-2009 Description The Community Center and Library at Ludovici Park is the first significant new building for the Village. The 11,300 SF two-story Community Center offers a meeting and performance space for events, lectures, and community activities overlooking a preserved mangrove area and the Biscayne Bay Aquatic Preserve. Because of the preserve careful consider- ation was given to keep the existing trees whenever possible. The first story is dedicated to the 8,800 SF library, which employs Florida Keys architecture, large windows protected by over hangs that double as verandas to introduce natural daylight into the spaces that will include a reading room, children’s center and computer lab. ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.53 OCEAN REEF CULTURAL AND COMMUNITY CENTER Ocean Reef, FL Client Ocean Reef Cultural Center Inc. Services Programming/Planning Architecture/Interior Design Mechanical Engineering/HVAC Electrical Engineering/Lighting Plumbing Engineering/Fire Protection Civil Engineering ADA Compliance Cost Estimating Project Cost Dates $6,500,000 1999-2001 Description As a community building, the landscaped open space enhances the character and spirit of the community that this project symbolizes. The courtyard serves as an entrance space, and in the traditional fashion all building spaces and entrances are organized around its perimeter. The courtyard is designed for passive activ- ities such as reading on benches under the shade of trees, strolling, and contem- plation in the nature of Japanese gar- dens. It is also designed as a venue for outdoor theater and music, for receptions and special events. The primary functional spaces were de- signed to allow independent operation of the Theater and Reception & Banquet Hall, the Historical Museum, the Library, and the Meeting Rooms. These spaces are accessible from each other via cov- ered walkways that encircle the central courtyard. CORPORATE STANDING AND AUTHORIZED SIGNATORY ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.55 CORPORATE STANDING AND AUTHORIZED SIGNATORY ARCHITECTURE ENGINEERING PLANNING INTERIOR DESIGN CITY OF SUNNY ISLES BEACH RFQ NO. 15-04-01 NEW FACILITY AT 18080 COLLINS AVE.56 3225 AVIATION AVENUE #400 MIAMI,FL 33133 Current Principal Place of Business: Current Mailing Address: 3225 AVIATION AVENUE #400 MIAMI,FL 33133 US Entity Name:WOLFBERG/ALVAREZ AND PARTNERS, INC. DOCUMENT#J47617 FEI Number: 59-1713092 Certificate of Status Desired: Name and Address of Current Registered Agent: ALVAREZ, JULIO E 3225 AVIATION AVENUE #400 MIAMI,FL 33133 US The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Officer/Director Detail : I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: Electronic Signature of Signing Officer/Director Detail Date FILED Jan 16,2015 Secretary of State CC9988234770 MARIA E. ENGLAND FINANCIAL MANAGER 01/16/2015 2015 FLORIDA PROFIT CORPORATION ANNUAL REPORT Yes Title PD Name ALVAREZ, JULIO E. Address 3225 AVIATION AVENUE #400 City-State-Zip:MIAMI FL 33133 FORMS AND ATTACHMENTS City of Sunny Isles Beach |Request for Qualifications No. 15‐04‐01 20     DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICATIONS SECTION 6 RESPONDENT SUBMITTAL FORMS OPENING: 2:00 P.M. 06/02/2015 NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Andrew J. Rozwadowski Date Issued: 04/30/2015 This Qualification Submittal Consists of Pages 19 -22 Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No. 15-04-01 Architectural Design Services for a New Facility at 18080 Collins Ave Procurement Agent: Firm Name: Andrew Rozwadowski ________________________________________ Commodity Code(s): RETURN ONE ORIGINAL AND SIX COPIES OF QUALIFICATION SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 22 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE