Loading...
HomeMy WebLinkAboutMCM LLC09.23.2015 RFQ NO. 15-08-02 CMAR FOR GOVERNMENT CENTER ANNEX AT 18080 COLLINS AVENUE PRIMARY POINT OF CONTACT Alexis Leal, Sr. Director of Corp. Operations P: 305.541.0000 E: aleal@mcm-us.com ALTERNATIVE POINT OF CONTACT Mark Hammerschmidt, Pursuits Manager P: 305.541.0000 E: markh@mcm-us.com TABLE OF CONTENTS Cover Letter and Executive Summary ..........................................2 Project Approach and Understanding .........................................4 Letter of Intent From Surety ........................................................10 Related Experience ....................................................................13 Pre-Construction Services Staff ..................................................21 Pre-Construction Staff Experience .............................................22 Construction Services Staff .........................................................26 Construction Staff Experience ....................................................27 Project Management Services....................................................31 Location of Offices .....................................................................39 Claims and Litigation History .....................................................40 Forms and Attachments .............................................................42 CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 3Construction with a Personal Touch September 23rd, 2015 Attn: Jane Hines, MMC, City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 RE: CMAR FOR GOVERNMENT CENTER ANNEX AT 18080 COLLINS AVENUE REQUEST FOR QUALIFICATIONS | NO. 15-08-02 Dear Evaluation Committee, It is with great pleasure that MCM present it’s qualifications for providing construction management services for constructing the Sunny Isles Beach Government Center Annex. We have thoroughly reviewed your project criteria and have assembled a team of highly qualified professionals who are ready to partner with the City of Sunny Isles Beach to deliver your project. A SOLID PARTNER MCM is a local family-owned business that first started serving the South Florida community over 31 years ago. Today MCM has grown into one of the largest full service contractors in the Southeast US with expertise in both the general building and heavy civil industry sectors. Over the years, MCM has constructed a large number of different types of facilities, including buildings for federal and state agencies, as well as for private clients. MCM’s fields of expertise include: roads and bridges, rail work, general building including municipal and commercial facilities, as well as education and aviation infrastructure. MCM is an ENR Top- 400 Contractor, and the 5th largest Hispanic owned contractor in the United States as ranked by Hispanic Business Magazine. The firm employs over 600 personnel worldwide and maintains a staff of roughly 300 employees in South Florida, along with a large heavy equipment fleet. In addition, MCM is ISO 9001 Certified and it is also a gold level member of the United States Green Building Council. WHY MCM? Why is MCM the most capable builder to construct the Sunny Isles Beach Government Center Annex? MCM is the most uniquely qualified firm to construct the Government Center Annex because it is a team that understands more than most, that the best value quality construction can’t be achieved without fully partnering with the owner to understand and realize their vision. Upon entering a partnership with MCM, the City of Sunny Isles Beach will immediately benefit from: Similar Project Experience: MCM has extensive experience in constructing municipal, educational and commercial facilities. Our portfolio includes the completion of 35 municipal projects in Miami-Dade County, and over 30 educational facilities. This includes projects such as the City of Homestead City Hall and City of Homestead Police Department facilities, both of which are currently under construction, and the City’s very own Norman S. Edelcup Sunny Isles Beach K-8 school. Commitment to Quality: Our quality management system and construction processes are ISO 9001 certified, ensuring that the highest standards of construction services will be provided to you. Our approach has been codified, and we are able to duplicate the same successful outcome on every project we undertake. Our Safety Culture: MCM takes a “Safety First” approach to construction safety and health on all of its projects. With an award winning safety program, MCM’s overall safety culture has earned it a respected safety reputation and an Experience Modification Rate (EMR) of 0.74, well below the average for a contractor that self-performs close to 80% of work on some of its projects. COVER LETTER CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 4Construction with a Personal Touch Working with a Local Builder: MCM has a long history of working in South Florida, as well as Sunny Isles Beach. Our knowledge of local conditions enables us to skillfully navigate the permitting and inspection processes, and the particulars of the local labor market with ease. We will leverage our strong relationships with local vendors, and key local subcontractors to ensure that your project benefits from the kind of home- town courtesy that an out-of-town firm simply cannot match. WE LISTEN TO EVERYONE! MCM’s most successful projects are those where we work together with the owner in the highest spirit of partnering. MCM’s history with pioneering innovative means-and-methods is punctuated by its reputation for cooperation. The team has a loyal following of subcontractors who, themselves, have adopted similar business practices. MCM learns from its subcontractors, design partners, and from its clients. The teams Lessons-Learned Library and courage to take calculated risks is the most significant reason MCM should be given the first opportunity to provide construction management services to the City of Sunny Isles Beach. THE MCM DIFFERENCE! Following its core principles, MCM can assure the City that they will receive the level of quality and service that has come to be expected from MCM. These principles include: Integrity: MCM is committed, at all levels, to build a successful project for the City of Sunny Isles Beach with a collaborative approach to construction, delivering excellence with the highest level of performance standards, aesthetic quality and truthfulness in our relationship. We do what we promise with no surprises. Respect: We respect the City’s need to maintain on-going business operations without disruption in the adjacent government center. MCM has demonstrated experience with this from past projects at the Miami International Airport and the multitude of classroom facilities we’ve constructed on occupied campuses. We successfully completed these projects without affecting on-going business operations and promise to do the same on your project. Service: MCM provides quality construction services in a courteous, efficient, and accessible manner. We foster owner and end-user involvement in the entire construction process, forming a partnership early on that will ensure all project goals are achieved at completion. Fairness: MCM is exceptionally qualified to deliver your project on time and on budget. The teams pricing is competitive and fair, and our Quality Management Systems will ensure the owner that their facility will be both functional and aesthetically pleasing; a facility that the City and it’s residents will be proud of. On behalf of the entire MCM family we thank you for your consideration and look forward to the opportunity to once again partner with the City of Sunny Isles Beach to deliver excellence together! Best Regards, Jorge Munilla President, MCM COVER LETTER CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 5Construction with a Personal Touch PROJECT APPROACH & UNDERSTANDING MCM understands that when selected as the Construction Manager for the Government Center Annex project, the firm will function as a General Contractor responsible for publicly bidding trade contracts, and scheduling and coordinating all activities required to successfully and economically complete the project on time. MCM will provide pre-construction services, develop a contractually agreed upon Guaranteed Maximum Price (GMP) budget, and ultimately construct the project. The project itself consists of constructing a new 100,000 SF Government Center Annex building adjacent to the existing Government Center at 18080 Collins Avenue. The facility will include spaces for municipal purposes, educational purposes, and community and civil uses as well as commercial spaces. In approaching the project, MCM will focus on accomplishing three primary objectives: 1. MCM will partner with the City of Sunny Isles Beach and the A/E to help realize their vision and deliver an aesthetically pleasing, economically feasible project that will serve the City and enhance the adjacent Government Center Building. 2. With businesses abutting the construction site on two sides of the project and the constant flow of pedestrian and vehicular traffic on the other two sides, MCM understands the importance of minimizing disruptions to businesses, residents, tourists and the traveling public throughout construction. 3. Throughout the construction process MCM’s Safety First! approach will ensure that the health and safety of non-construction and construction personnel is always the first priority. COMMITMENT TO PARTNERING MCM’s project approach begins with its partnering approach, which is designed to allow for all phases of the construction process to be performed within an environment of mutual trust, commitment to shared goals, and open communication between the City of Sunny Isles Beach, the A/E of Record, their consulting partners, MCM and their subcontractors. In this approach we will establish a working relationship among all of the team members based on a plan of cooperation and teamwork. Prior to project commencement, MCM’s Project Manager Juan Campos, will establish a partnering plan that will create an atmosphere in which all parties are working in harmony toward mutual goals to avoid delays, claims and litigation. Essential elements of this plan are as follows: ►Commitment to partnering by the top management of every organization involved in the project. ►Trust relationship between all parties through personal relation ships and open communication with mutual sharing and under standing of each party’s risks and goals. ►A partnering charter developed jointly by all parties to the project which identifies specific mutual goals and objectives of the partnering participants for continuous evaluation and review against the agreed upon mutual goals. ►Timely resolution of any disputes at the lowest level possible during the project. “MCM’s commitment to partnering is ingrained in every facet of our orga- nization. As a family owned business we truly understand that there is no better way to achieve our common goals then working together as a team.” Jorge Munilla, President MCM CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 6Construction with a Personal Touch PROJECT APPROACH & UNDERSTANDING As part of our partnering procedure to resolve conflicts, MCM will create a Risk Management Plan that will layout foreseeable conflicts that could arise during the project based on our extensive experience with building similar projects under similar conditions. These issues are analyzed for the best possible solutions or for ways to minimize the risks in order to avoid the problem completely. MCM’s successful partnering history demonstrates our ability to resolve conflicts and maintain customer satisfaction, which is part of our ISO 9001 Certification discussed later on in the Quality Assurance section. We partner with our client, whether formally or informally, from the beginning of each project to assure there is a clear understanding that everyone will work as a team in the best interest of the project and, consequently, work to resolve all construction issues. MCM works hard to maintain great relationships with our clients, consultants and subcontractors so that issues and conflicts are resolved quickly without finger pointing. Below are examples of some of the issues we have encountered on some of our projects, and how we were able to resolve those issues by working in an atmosphere of mutual trust and cooperation to achieve a common goal: Miami-Dade ISD West Lot Multi-Use Facility - During excavation of the foundations on the north side of the garage, MCM encountered an unforeseen manhole used for the existing chiller lines that encroached into the proposed foundations of the parking garage. These chilller lines provide the main water supply for the Miami-Dade Governemnt buildings adjacent to the property, and, therefore could not be relocated. MCM proactively partnered with the structural engineer, suggesting that the spread footers be placed adjacent to each side of the chiller lines and then straddled with a grade beam. The building loads above the chiller lines would be transferred to the adjacent footers and not impact the lines. The structural engineer approved the suggestion and there was no additional cost to the owner. The following day the resolution was implemented in the field. No time was lost in the schedule since MCM and the project team addressed and implemented the solution quickly. At the Norman S. Edelcup Sunny Isles Beach K-8 project, the schedule was substantially impacted due to delays stemming from the late removal of on-site and overhead utilities by the local power and telecommunication companies. In an effort to prevent further schedule creep and to ensure the successful on-time delivery of this geographically important school, MCM along with the owner, Miami-Dade County Public Schools (MDCPS), met with utility companies to discuss all options for removal and relocation. It was during one of these meetings that MCM offered to install new underground infrastructure at no cost to the owner, in order to expedite removal of overhead lines which were preventing the completion of the buildings foundations. Material was supplied by the power company and MCM quickly moved to complete the work. In this instance, if MCM had not partnered with the Owner and the utility companies for a quick solution, the delay would have cost not only the owner and MCM time and money, but also would have resulted in the project team falling short on their promise to the community, incoming students and all other project stakeholders to deliver this school in-time for the new school year. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 7Construction with a Personal Touch PROJECT APPROACH & UNDERSTANDING OUR ABILITY TO MINIMIZE DISRUPTIONS As a result of MCM’s extensive experience working in urban sites adjacent to occupied facilities, combined with the firm’s partnering approach, MCM has been able to accomplish project success time and again with minimal disruption to adjacent business operations and the traveling public. As noted in the previous section of this proposal, MCM’s commitment to open communication and shared goals with the City of Sunny Isles Beach is the key to ensuring construction activities cause little to no impact throughout the course of the project. At a minimum, MCM’s plan to prevent disruptions will take into account: ►Safe movement of pedestrian and vehicular traffic along Collins Avenue and Atlantic Blvd. ►Control measures for dust, noise and construction debris run-off. ►Government Center and adjacent businesses hours of operation. ►City calendar and events ►Hours of operation and schedule of events for Sunny Isles Beach K-8 school. APPROACH TO MINIMIZE DISRUPTIONS DURING CONSTRUCTION Prior to commencement, and throughout construction, Juan Campos, Project Manager will be in constant communication with project stakeholders to ensure they are aware of current and planned construction activities, and to provide them an opportunity to voice any concerns prior to the commencement of each phase of work. During construction MCM will provide status updates to the City of Sunny Isles Beach for distribution to their staff and residents, as well as provide updates to adjeacent businesses on the north side of the project. MCM will also utilize flagmen and project signage to clearly identify safe routes for pedestrian and vehicular traffic and to minimize impact of construction traffic on surrounding businesses and the traveling public. In addition, understanding that the City is a prime tourist destination and prides itself as Florida’s Riviera, MCM will pay particular attention to preventing impacts from dust, noise and construction debris run-off. This includes the erection of site fencing covered in graphic panels to prevent tourists and the traveling public from seeing the unsightliness of a construction site. A graphic representation of this site fence is provided below. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 8Construction with a Personal Touch PROJECT APPROACH & UNDERSTANDING EXAMPLES OF MCM’S ABILITY TO MINIMIZE DISRUPTIONS MCM’s ability to minimize business operations is tried and test- ed from the successful completion of such projects as the FIU North Stadium Expansion, Aventura Government Center Park- ing Garage, Jackson Memorial Hospital North Parking Garage and the multitude of projects completed in occupied facilities at Miami International Airport and for Miami-Dade County Public Schools. Below you will find two project examples where MCM’s approach to partnering with the owner resulted in minimal inter- ruptions to business operations: On the Miami International Airport North Terminal Im- provements project, MCM and the Miami-Dade Aviation Department (MDAD) worked diligently to ensure that the project would be delivered on-time, and that business op- erations, along with over 107,000 daily passengers, were minimally impacted. From weekly field progress walk-throughs to bi-weekly scheduling/strategy meetings, MCM and the Miami Aviation Department worked as one to ensure the facility’s con- tinued operations, as well as the project’s overall schedule were not impacted. One strategy adopted by MCM and MDAD to accomplish this was to plan and execute a Phased Terminal Opening that al- lowed turn-over of one project area (approximately 23,000 SF) a full 30 days ahead of the originally scheduled milestone, and separate of the project’s overall turn-over. This was achieved by coordinating with the fire department, building depart- ment, airport operations, and subcontractors, minimizing impacts upon the terminal’s ongoing operations, and fa- cilitating the project’s overall progress. At the Miami Senior High School (MSH) project, MCM worked closely with Miami-Dade County Public Schools (MDCPS) and the school staff for four years to execute a comprehensive phased renovation of this occupied high school. MCM coordinated with the owner and school almost daily to ensure that the over 4000 students and faculty occupying the facility were not impacted by construction. By pre-planning with MDCPS and MSH for every phase of construction, and using techniques such as the construction of demising walls, temporary classroom facilities and covered walkways for safe passage through con- struction zones, MCM, MDCPS and MSH were able to deliver this project on time, below budget, and with minimal interruption to daily business operations. CLIENT TESTIMONIALS “On behalf of the entire faculty, staff and student body of Miami High, we want to thank MCM for assisting in making sure our long Stingaree tradi- tions during homecoming week continued. MCM has truly been a partner in making sure that the construction around us not curb the academic or social needs of our students...” Madeline Mendez, Assistant Principal Miami Senior High School “I would like to take this opportunity to acknowl- edge MCM for their dedication and commit- ment in working with Miami-Dade Fire Rescue (MDFR) to construct our state-of-the-art training facility... All of facilities were completed with a minimum of disrup- tion to our surrounding fire headquarters and nearby businesses that continued to operate during the course of the construc- tion.” Fire Chief David Downey, Director Miam-Dade Fire Rescue Department “This letter will serve as confirmation that MCM has managed several construction projects at Miami International Air- port since 1998...They have always demonstrat- ed an excellent perfor- mance, commitment to quality & safety, and great passenger traffic control and dust control coordination caus- ing the least disruptions to MIA’s Opera- tions.” José Abreu, P.E., Director (Former) Miami-Dade Aviation Department CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 9Construction with a Personal Touch MCM SAFETY APPROACH MCM takes a “Safety First” approach to construc- tion safety and health on all of its projects. MCM management, from the Board of Directors to our field offices, is committed to workplace and employ- ee safety. Our safety department works to ensure that our occupational safety and health policies and practices are in line with industry leading “Best Prac- tices.” Moreover, MCM employs degreed safety pro- fessionals who are formally educated and trained in Safety Management and OSHA compliance. A Safety Manager is assigned to each project we build in some capacity depending on the size and scope of the project; our philosophy with each project we build is to achieve zero negative incidents with re- gard to employee safety and health. To achieve the safety success that has earned MCM a respected safe- ty reputation and an exceptional Experience Modification Rate (EMR) of 0.74, we utilize the el- ements listed below to cultivate a safety culture that is representative of MCM’s com- mitment to quality management and safe working conditions: ►Perform a Hazard Analysis of the project scope to identify areas of safety and health risk. ►Carefully select qualified subcontractors with markedly better than average safety records. ►Require that superintendents, managers, foremen, and/or crew leaders have ob- tained a minimum 30 hr OSHA certification. ►Require that subcontractors be responsible and accountable to project safety including submission of required documentation of qualified personnel. ►Ensure that all employees are qualified, certified, and or trained to perform their duties. ►Each employee shall be given a project specific orientation and be identified before starting work onsite. ►Communication is a necessity! Weekly subcon- tractor meetings will include SAFETY as a talking point. Subcontractors are encouraged to commu- MCM SAFETY RECORD MCM’s Corporate Safety Manual, which was up- dated November of 2014, includes over 300 pag- es of standards, policies, forms, definitions, and testing procedures that will be used to develop a custom Site Specific Safety Program for the Sun- ny Isles Beach Government Center Annex project. By breaking each project down into manageable “Definable Features of Work”, we can identify the hazards associated with each phase of con- struction and use a “Top-Down” approach so that managers, foremen, and workers are all aware and trained on the job site hazards. We track “Man-Hours without a Near Miss” and keep the workers motivated by recognizing safety achieve- ments. This time tested approach has helped MCM achieve an award winning safety record over it’s 31 year history. Recent accolades include: FTBA Safety Award of Superior Achievement since 2008 USF Health Sunshine State Safety Recognition Awards since 2013 WHITE LEVEL MEMBER - OSHA-AGC Strategic Partnership Program 6 6 PROJECT APPROACH & UNDERSTANDING CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 10Construction with a Personal Touch A CLEAN JOB IS A SAFE JOB! As part of MCM’s pre-emptive approach to construction debris & dust control, MCM will employ full time labor on the site to assist subcontractors in daily clean-up. PROJECT APPROACH & UNDERSTANDING nicate freely with MCM Safety. ►Subcontractors will additionally hold weekly tool box talks and submit to MCM. ►MCM will continuously monitor project safety; identified issues will be closed immediately or work halted. ►MCM Safety will analyze and report on; project safety perfor- mance, subcontractor safety performance, site safety issues, and negative events to identify less than adequate patterns or trends in project personnel, activities, conditions, safety cul- ture, etc. ►MCM holds accountable persons who are acting beyond the parameters of our policies and procedures, or those promul- gated by federal, state, or local agencies. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 11Construction with a Personal Touch LETTER OF INTENT FROM SURETY CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 12Construction with a Personal Touch LETTER OF INTENT FROM SURETY CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 13Construction with a Personal Touch LETTER OF INTENT FROM SURETY CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 14Construction with a Personal Touch RELATED EXPERIENCE WHAT DO WE DO? We build your project on time, on budget, as designed and without any surprises. We build the roads and bridges that get us home. We build the schools where our children learn. We build the airports that connect our cities. We build the treatment plants that clean our water. We build the places where we all live, work, shop and play. At MCM we are master builders, committed to Building Excellence. Jorge Munilla, President MCM MCM MARKET SECTORS Building Operations Civil Operations BUILDINGS EDUCATION AVIATION ROAD & BRIDGE TOLLING RAIL MCM is a full service contractor with over 31 years of experience successfully delivering projects in the municipal, education, com- mercial, residential, healthcare, aviation, federal, road & bridge, rail and heavy civil market sectors. The firms services include general contracting, design-build, preconstruction, construction management and public-private partnerships. In South Florida alone MCM has successfully delivered on-time and budget, over $1.85 BILLION IN CONSTRUCTION PROJECTS. This includes but is not limited to: ►35 municipal projects ►33 educational projects ►19 road & bridge projects ►18 multi-family residential projects ►17 aviation projects CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 15Construction with a Personal Touch RELATED EXPERIENCE Owner or Agency LTC Colonel Betsy Evans EN, FLARNG, 53rd BSTB Commander Project Manager State of Florida Department of Military Affairs Construction and Facility Management Office Ph: (904) 823-0280 E: elizabeth.a.evans16.mil@mail.mil Architect/Engineer Jose “Tony” Buitrago, Project Manager CSA Group Ph: (786) 897-6393 E: jbuitrago@csagroup.com Key Personnel Joe Fernandez - Project Exec. Armando Perez - Estimator Ruben Bravo - LEED Manager Eddie Martinez - Safety Manager MIRAMAR READINESS CENTER MIramar, FL SIMILARITIES TO YOUR PROJECT • Construction of municipal facility • Flexible-Use Spaces • Construction of educational spaces • CM at-Risk project • Pre-construction and Construction Phase Services StatusEstimated Completion 10/2015 Delivery Method CM at-Risk Project Size/Contract Value 102,000 SF | $18.9 M Brief Description of Work Performed As part of the Department of Military Affairs Military Construction (MILCON) program, this project consists of building a new 102,000 SF Operations Center Facility to support the training and readiness of the local Army National Guard units serving the region. This work includes all materials, labor, equipment and services, including all civil, landscaping, structural, architectural, heating, ventilating, air conditioning, plumbing, fire protection, electrical and other miscellaneous work necessary to fully construct the Readiness Center Facility. The Readiness Center is located on a 30 acre site within the city of Miramar in Southwest Broward County, and is composed of the 102,000 SF Readiness Center Building, a 456 Privately Owned Vehicles (POV) parking area, a 125,000 SF Military Owned Vehicles (MOV) parking area, storm water retention areas, and other site improvements. The project has been registered with the U.S. Green Building Council’s (USGBC) Leadership in Energy and Environmental Design (LEED) Green Building Rating System Program and will be built to achieve a LEED Silver rating. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 16Construction with a Personal Touch Owner or Agency Julio Brea City of Homestead Ph: 305-301-4464 E: jbrea@cityofhometead.com Architect/Engineer Ivan Bibas Rodriguez and Quiroga Architects Ph: 305-44-7417 Key Personnel Joe Fernandez - Project Exec. Armando Perez - Estimator Ruben Bravo - LEED Manager Eddie Martinez - Safety Manager HOMESTEAD CITY HALL HOMESTEAD, FL RELATED EXPERIENCE SIMILARITIES TO YOUR PROJECT • Construction of municipal facility • Flexible-Use Spaces • Civic and Community Spaces • Construction of educational spaces StatusEstimated Completion 03/2016 Delivery Method Design-Bid-Build Project Size/Contract Value 84,000 SF | $25.5 M Brief Description of Work Performed The project consist of the construction of an 84,000 SF, 3-story New City Hall with Council Chambers occupancy for over 250 persons, emergency operations center, Mayor and City Manager’s Office, Council Member’s offices, Building Department, Public Works, and IT System support rooms and associated electrical and infrastructure rooms. The project also includes the construction of a 200-space surface parking lot and all associated landscaping, drainage, signing and pavement marking. The building’s structure is composed of a precast joist system, architectural precast walls and column panels on exterior veneer, high efficiency storefront glazing and impact- resistant windows. Site improvements include a 140,000 SF exterior concrete plaza & sidewalks and 3,000 SF exterior structural arcade, landscaping & sod. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 17Construction with a Personal Touch Owner or Agency Mario Gonzalez-Pola City of Miami Beach - Capital Improvements Ph: (305) 342-3358 Email: gp_mario@yahoo.com Architect/Engineer Ofer Shtark STA Architectural Group Ph: (305) 571-1811 E: ofer@staarchitecturalgroup.com Key Personnel Armando Perez - Estimator Eddie Martinez - Safety Manager Ruben Bravo - Project Engineer 10TH ST. AUDITORIUM & MIA BEACH PATROL HEADQUARTERS Miami Beach, FL SIMILARITIES TO YOUR PROJECT • Construction of educational spaces • Flexible-Use Spaces • Project in beach environment • Urban site conditions • CM at-Risk project • Pre-construction and Construction Phase Services StatusCompleted 08/2009 Delivery Method CM at-Risk Project Size/Contract Value 15,000 SF | $6.6 M Brief Description of Work Performed This project consist of the partial restoration, renovation and additions- to the existing 2- story Auditorium/Beach Patrol Headquarters facility in Miami Beach, FL. The scope of work included improvements to accessibility, life safety and partial site improvements, as well as comprehensive improvements to the original 15,000 SF, state-of-the- art 10th Street Auditorium. Additional scope elements included: a 2-story exhibition hall, a retail gift store, administrative offices, vital support facilities for ocean rescue operations, and renovated public restrooms. Moreover, a breezeway was constructed between the two buildings in order to re-establish the historic north-south pedestrian connection within Lummus Park. RELATED EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 18Construction with a Personal Touch NORMAN S. EDELCUP SUNNY ISLES BEACH K-8 Sunny Isles Beach, FL Owner or Agency Victor Alonso, RA Administrative Director Miami-Dade County Public Schools (MDCPS) 1450 NE 2nd Avenue, Miami, FL 33132 Ph: (305) 995-4606 Architect/Engineer James Cohen, Managing Partner SBLM Architects 11430 North Kendall Drive, Miami, FL 33176 Ph: (305) 412-9187 Key Personnel Armando Perez - Estimator Eddie Martinez - Safety Juan Campos - Project Manager Tony Manning - Superintendent Ruben Bravo - Project Engineer RELATED EXPERIENCE SIMILARITIES TO YOUR PROJECT • Construction of educational spaces • Flexible-Use Spaces • Project in Sunny Isles Beach • Urban site conditions • CM at-Risk project • Pre-construction and Construction Phase Services Status Completed 12/2008 Delivery Method CM at-Risk Project Size/Contract Value 165,000 SF | $ 32.9M Brief Description of Work Performed Construction Management At-Risk of a new multi-story K-8 facility designed to house 1,642 student stations on 2.1 acres in the City of Sunny Isles Beach. The school totaled approximately 165,000 SF, and included the construction of a 4-story classroom building housing classes for all grades, as well as art, science and computer labs; a 2-story administration building; a 2-story cafetorium and media center building with a commercial kitchen and working stage, and an integrated 3-story pre-cast parking garage providing 145 faculty parking spaces and shelter for physical education activities. The tilt- up construction method was combined with a pre-cast joist deck system at intermediate levels and steel bar joists at the roof level to construct the buildings shell. Unique features on this project included the installation of over 600 auger-cast piles, eight deep-injection wells for drainage and several 4-story, 86 ft tall tilt-up panels, which at the time, were the tallest panels erected in Miami-Dade County. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 19Construction with a Personal Touch Owner or Agency Humberto Contreras Miami-Dade Internal Services Department (ISD) Ph: (305) 375-3956 E: hcontr@miamidade.gov Architect/Engineer John Junkin PJB Associates Ph: (305) 665-0641 E: jjunkin@pjbarchitects.com Key Personnel Armando Perez Eddie Martinez Ruben Bravo Juan Campos MIAMI-DADE COUNTY ISD WEST LOT MULTI-USE FACILITY MIAMI, FL RELATED EXPERIENCE SIMILARITIES TO YOUR PROJECT • Construction of mixed-use facility • Commercial and municipal spaces • Urban site conditions • Pre-construction and Construction Phase Services StatusCompleted 09/2012 Delivery Method Design-Build Size of Project/Contract Value Project Size/Contract Value 324,000 SF | $15.4 M Brief Description of Work Performed The IDS West Lot Multi-Use Facility Project was MCM’s second Design- build Project for Miami-Dade County Internal Services Department and was certified as a LEED Gold Project. This 6-story pre-cast facility occupies the entire project site at approximately 1.73 acres and is comprised of 810 parking spaces distributed across 324,000 SF of parking area; including 45,000 SF of a municipal office space on four floors, plus 10,000 SF of commercial space on the ground floor. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 20Construction with a Personal Touch RELATED EXPERIENCE StatusCompleted 02/2014 Delivery Method Design-Bid-Build Project Size/Contract Value 400,000 SF | $48.9 M Brief Description of Work Performed This project consists of extensive historical renovations, additions, and alterations to the oldest high school in South Florida.Work is scheduled under three major phases with the first phase consisting of construction of new buildings around the existing occupied campus. This added three new multi-story classroom buildings, a 3-story precast parking garage, new Central Energy Plant housing the “New Heart” of the campus. Phase Two shifted students from the historical buildings into the newly constructed classrooms allowing for a complete renovation of the historic buildings. This included installation of new hurricane impact windows, HVAC, Electrical, Plumbing and Fire Sprinkler systems. Under this phase the Media Center was overhauled and the decorative steel trusses exposed. Additionally, the 1,132 fixed seat Auditorium received new seating, lighting and sound systems. Phase Three consists of overall site improvements, including new irrigation and landscaping in Columbia Park, construction of Stingaree Plaza, dedicated student drop-off and pick-up areas and all other miscellaneous hardscape upgrades. When completed in 2014, the school’s capacity increased from 1,649 to 2,800 student stations. Owner or Agency Victor Alonso, RA Administrative Director Miami-Dade County Public Schools (MDCPS) 1450 NE 2nd Avenue, Miami, FL 33132 Ph: (305) 995-4606 Architect/Engineer Jose Murguido, Principal Zyscovich Architects 100 N. Biscayne Blvd., 27th Floor, Miami, FL 33132 Ph: (305) 372-5222 x1150 Key Personnel Joe Fernandez Armando Perez Eddie Martinez Ruben Bravo Tony Manning MIAMI SENIOR HIGH SCHOOL MIAMI, FL SIMILARITIES TO YOUR PROJECT • Construction of educational spaces • Flexible-Use Spaces • Urban site conditions • Construction adjacent to occupied structures • spaces use for community and civic purposes CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 21Construction with a Personal Touch MIAMI-DADE FIRE RESCUE TRAINING FACILITY DORAL, FL Owner or Agency Angel Lamela, Division Manager Miami-Dade Fire Rescue Department Ph: 305.799.7889 E: alamela@miamidade.gov Architect/Engineer Anthony Valino, Project Manager AECOM Design Ph: 305.444.4691 E: Anthony.valino@aecom.com Key Personnel Armando Perez Eddie Martinez Juan Campos RELATED EXPERIENCE SIMILARITIES TO YOUR PROJECT • Construction of educational spaces • Flexible-Use Spaces • Construction adjacent to occupied government facility • Municipal facility Status Completed 07/2010 Delivery Method Design-Bid-Build Project Size/Contract Value 58,000 SF | $ 25.2 M Brief Description of Work Performed The scope of this project required the complete construction of 11 buildings and miscellaneous steel structures in a 10 acre mock cityscape setting for advanced training for the Miami Dade Fire and Rescue Department. The main components included the construction of four pre-engineered structural steel buildings for vehicle extrication and outdoor training, a storage building and a 58,000 SF tilt-up concrete panel Trade School Building, housing offices, flex-use spaces, classrooms, gym and locker room facilities, a fully functioning mock fire station and 260,000 gallon pool. In addition to these structures, 15 Live Fire Training Props were installed in and around four training buildings constructed to resemble a six-story Apartment Tower, Residential House, Commercial/Industrial Building and Maritime Ship. These fire training props were fed by approximately 2,500 LF of underground liquid petroleum and vapor gas lines connected to an 18,000 gallon LP Gas tank. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 22Construction with a Personal Touch PRE-CONSTRUCTION SERVICES STAFF Mr. Fernandez has over 20 years of ex- ecutive managerial experience in the construction industry. He has managed and supervised a wide range of proj- ects that include jobs in the education- al, municipal, multi-Story residential, healthcare and aviation market sectors. For MCM he serves as the Director of General Construction, overseeing all building operations in the Florida market. For the Government Center An- nex at Collins Avenue Project, Mr. Fernandez will pro- vide overall management, direction and administration, including serving as a liaison to the College. Joe is a seasoned construction professional with a proven track record of delivering results on schedule and within bud- get; he is a State of Florida Certified G.C., a US Army Corps of Engineers certified QC Manager, and a retired US Navy SEAL. Joe Fernandez Project Executive Ove r s i g h t Jorge Munilla President / Principal-in-Charge Partnering Juan Campos Project Manager Mike Verwey Project Engineer Tony Manning General Superintendent Eddie Matrinez Safety Manager Erick Valderrama Pre-Construction Manager PRECONSTRUCTION CONSTRUCTION JORGE MUNILLA President/Principal-in-Charge Mr. Munilla provides leadership and oversight of the day-to-day operations for all Construction, Project Management and Proj- ect Administration activities. Mr. Munilla’s duties for the Govern- ment Center Annex at Collins Avenue Project includes guaranteeing owner sat- isfaction, establishing the safety and quality cul- ture for the team, and ensuring successful project completion. Mr. Munilla is a Certified General Contractor and is actively involved in several or- ganizations in the construction industry such as the Latin Builders Association and he is a past president of the South Florida Association of General Contractors. A/E LEGEND JOE FERNANDEZ Project Executive Office Support Staff Field staff Armando Perez, P.E. Chief Estimator * See Pre-Construction Staff Experience Tab for complete resumes. Ruben Bravo LEED Manager/Sustainable Construction Jorge Mejia, CM BIM BIM Coordinator CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 23Construction with a Personal Touch Eric Valderrama, Pre-Construction Manager Summary of Qualifications Erick has 23 years of construction experience in the local South Florida market. He is a Civil Engineering graduate of Florida International University, is a Certified General Contractor and LEED Green Associate. He currently serves on Miami-Dade County’s Community Affordable Housing Strategies Alliance (CAHSA) Board, Florida International University Alumni Association Board of Directors, and is Executive Board of Director with the Latin Builder’s Association. He has supervised a variety of large- scale projects. His diverse experience during his career includes management of construction operations, risk management, and estimating. Erick is currently the Pre- construction manager overseeing contract negotiations, estimating, and purchasing. He also collaborates with the project owner, government agencies, and architectural design teams. Relevant Project Experience Summary EAST COAST BUILDING, Miami, FL Cost: $10.3 M | Delivery Method: CM At-Risk Scope: 94,440 SF, 9 story mixed-use storage facility with 831 storage units inclusive of a ground floor retail space, mezzanine space & roof top restaurant tenant. Project consists of spread footing foundations & post tension slabs. Site is located adjacent to the Miami River where extensive dewatering will be required. WESTMINSTER CHRISTIAN ELEMENTARY SCHOOL, Palmetto Bay, FL Cost: $5 M | Delivery Method: CM At-Risk Scope of Work: This project consists of constructing a new building while the campus is in operations after coordination of the demolition of existing buildings. The new 50,000 SF building includes classrooms, music lab, arts lab, community center, learning center, dance room, conference rooms, faculty lounge and offices. Exterior recreational areas, landscaping and 41 new parking spaces wee also included in the project scope. UNIVERSITY OF MIAMI CONVOCATION CENTER, Miami, FL Cost: $40M | Delivery Method: CM At-Risk Scope of Work: Overseeing all construction operations related to the multi-level 205,000 SF 10,000 seat indoor college basketball arena. The project consisted of a concrete structural frame and an extensive structural steel roof truss framing system. The building also included an extensive audio/visual and communications infrastructure backbone to support the multipurpose entertainment facility located in the center of campus. FIU LIBRARY EXPANSION, Miami, FL Cost: $25 M | Delivery Method: CM At-Risk Scope of Work: The FIU Library expansion included a fast track, phased construction to add 200,000 SF to the existing 70,000 SF library. The project included a structural retrofit to the existing three stories and addition of five additional floors (with future structural provisions for a total of fifteen floors). The project was carefully constructed allowing the existing library sophisticated computer systems and ongoing university and library operations to continue uninterrupted while all construction activities were ongoing. FIU SCHOOL OF LAW, Miami, FL Cost: $32 M | Delivery Method: CM At-Risk Scope of Work: The building consists of a multilevel 150,000 SF structure including a state accredited law library, auditorium, courtrooms, and classrooms that include instructional media and office spaces. Years of Experience MCM: 5 years Other Firms: 18 years Current Assignment Corporate Office 100% Availability for this Project Education Bachelor of Science in Civil Engineering, Florida International University 1995 Registrations & Professional Affiliations • Certified Florida General Contractor # 060203 • Certified Florida Engineering Intern # 497ET183 • ISO 9001:2008 • LEED Green Associate • OSHA 30 Hour • Primavera P6 • Suretrack • AutoCAD • Primavera Expedition PRE-CONSTRUCTION STAFF EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 24Construction with a Personal Touch Armando Perez, P.E., Chief Estimator Summary of Qualifications Armando Perez has over 41 years of comprehensive experience in Building Construction projects in the Municipal, Commercial, Aviation, Educational, and Residential market sectors. He is a graduate of Florida International University and is a licensed Professional Engineer. Armando is also a State of Florida Certified Uniform Building Code Inspector, General Contractor and a LEED accredited professional. Relevant Project Experience Summary MIRAMAR READINESS CENTER, Miramar, FL Cost: $19.9 M | Delivery Method: CM At-Risk Scope of Work: This project consists of building a new 102,000 SF Readiness Center Facility to support the training and readiness of the local Army National Guard units serving the region. Located on a 30 acre site within the city of Miramar in Southwest Broward County, the Readiness Center will also include a 456 Privately Owned Vehicles (POV) parking area, a 125,000 SF Military Owned Vehicles (MOV) parking area, storm water retention areas, and other site improvements. The Project has been registered with the U.S. Green Building Council’s (USGBC) to achieve a LEED Silver rating. HOMESTEAD CITY HALL, Homestead, FL Cost: $25.5 M | Delivery Method: Design-Bid-Build Scope of Work: The project consist of building an 84,000 SF, 3-story City Hall , including Council Chambers with fixed-seating for over 250 people; Emergency Operations Command Center; Offices for the Mayor, City Manager, and Council Members; New Building Department, Public Works Department, and other administrative and government support spaces; site utility work, including the construction of over 2,500 LF of 15” to 24” HDPE drainage pipe; a 140,000 SF exterior concrete plaza; 3,000 SF exterior structural arcade; misc. Hardscapes and landscaping. 10TH ST. AUDITORIUM & BEACH PATROL HEADQUARTERS, Miami Beach, FL Cost: $6.6 M | Delivery Method: CM At-Risk Scope of Work: This project consists of the partial restoration, renovation and addition to existing two-story Auditorium/Beach Patrol Headquarters facility, improvements to accessibility, life safety and partial site improvements included. NORMAN S. EDELCUP SUNNY ISLES BEACH K-8, Sunny Isles Beach, FL Cost: $28.5 M | Delivery Method: CM At-Risk Scope of Work: Construction Management at Risk of a new Multi-story K-8 Facility designed to house 1,642 student stations on 2.1 acres in the City of Sunny Isles. The school is organized on a “School-within-a-School” concept and totals approximately 145,000 gross square feet, including a 4 story classroom building. Additionally, a separate 3 story parking garage was also built. MIAMI SENIOR HIGH SCHOOL, Miami, FL Cost: $54.4 M | Delivery Method: Design-Bid-Build Scope of Work: This project included comprehensive improvements to all building systems and interior finishes; the construction, tie-in, testing and commissioning of a new Central Energy Plant; the construction of three (3) new classroom buildings; significant low voltage/data system upgrades; major landscaping improvements; and a total retrofit and upgrade of both the auditorium and gymnasium. Pedestrian traffic was re-routed dozens of times, without a single safety incident involving students, faculty, staff, or visitors to the campus. The campus underwent numerous improvements, including upgrades to the courtyard spaces, comprehensive landscaping upgrades, and improvements to both athletic fields and parks. Years of Experience MCM: 12 years Other Firms: 29 years Current Assignment Corporate Office 100% Availability for this Project Education Bachelor of Science in Structural Engineering, Florida International University, 1976 Registrations & Professional Affiliations • Registered Professional Engineer, Florida # 28026 • Florida Certified General Contractor # CGC009896 • Florida Certified Uniform Building Code Inspector • LEED AP BD+C PRE-CONSTRUCTION STAFF EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 25Construction with a Personal Touch Ruben Bravo, LEED Manager/Sustainable Construction Summary of Qualifications Ruben Bravo has 15 years of experience in the construction industry with a focus on sustainable construction. He is a LEED Accredited Professional, Green Advantage Certified, and served as the Green Schools Chair for the USGBC South Florida. He is deeply committed to the implementation of sustainable construction practices at all of MCM’s projects and served as the LEED Manager on the ISD Trade Shops Facility which is the first LEED Silver certified building owned by Miami-Dade County, the ISD West Lot Mixed-Use Facility and the Port of Miami Terminal D Expansion project. All three of these projects achieved their LEED Certification goal with the later two projects exceeding the clients certification requirements. Recent Project Experience Summary MIRAMAR READINESS CENTER, Miramar, FL Cost: $19.9 M | Delivery Method: CM At-Risk Scope of Work: This project consists of building a new 102,000 SF Readiness Center Facility to support the training and readiness of the local Army National Guard units serving the region. Located on a 30 acre site within the city of Miramar in Southwest Broward County, the Readiness Center will also include a 456 Privately Owned Vehicles (POV) parking area, a 125,000 SF Military Owned Vehicles (MOV) parking area, storm water retention areas, and other site improvements. The Project has been registered with the U.S. Green Building Council’s (USGBC) to achieve a LEED Silver rating. 10TH ST. AUDITORIUM & BEACH PATROL HEADQUARTERS, Miami Beach, FL Cost: $6.6 M | Delivery Method: CM At-Risk Scope of Work: This project consists of the partial restoration, renovation and addition to existing two-story Auditorium/Beach Patrol Headquarters facility, improvements to accessibility, life safety and partial site improvements included. MIAMI SENIOR HIGH SCHOOL, Miami, FL Cost: $54.4 M | Delivery Method: Design-Bid-Build Scope of Work: This project included comprehensive improvements to all building systems and interior finishes; the construction, tie-in, testing and commissioning of a new Central Energy Plant; the construction of three (3) new classroom buildings; significant low voltage/data system upgrades; major landscaping improvements; and a total retrofit and upgrade of both the auditorium and gymnasium. Pedestrian traffic was re-routed dozens of times, without a single safety incident involving students, faculty, staff, or visitors to the campus. The campus underwent numerous improvements, including upgrades to the courtyard spaces, comprehensive landscaping upgrades, and improvements to both athletic fields and parks. MIAMI-DADE ISD TRADE SHOPS, Miami, FL Cost: $13.1 M | Delivery Method: Design-Build Scope of Work: This design-build project was the first Miami-Dade County LEED Silver Certified facility utilized by County employees and is now home to the Internal Services Division, Design and Construction Services Division. MIAMI-DADE ISD WEST LOT MULTI-USE PARKING FACILITY, Miami, FL Cost: $15.4 M | Delivery Method: Design-Build Scope of Work: The ISD West Lot Project was MCM’s second Design-build Project for Miami-Dade County General Services Administration and achieved a LEED Gold Certification. This 6-story pre-cast parking facility occupies the entire 1.73 acre project site and is comprised of 810 parking spaces dispersed across 324,000 SF of parking area; additionally, 45,000 SF of office space on four floors, plus 10,000 SF of retail space on the Ground Floor were also constructed. Years of Experience MCM: 8 years Other Firms: 7 years Current Assignment Our Lady Of Guadalupe 100% Availability for this Project Education M.S. in Construction Management, Florida International University, 2008 Master in Construction Management and R.E. Development, P. University Catholic of Chile, 1998 B.A. in Civil Construction Technology, P. University Catholic of Chile, 1996 Registrations & Professional Affiliations • LEED AP BD+C • Green Advantage PRE-CONSTRUCTION STAFF EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 26Construction with a Personal Touch Jorge Mejia, BIM Coordinator Summary of Qualifications Jorge is a talented construction manager specialized in drafting and BIM Design. He will aid the design and construction team during the design phase to generate a 3D Model which will avoid clashes during construction. In addition to his BIM Coordinator duties he is an experienced estimator, and has also performed as a project engineer out in the field, which gives him a well-rounded background to be able to asses the design as it progresses and provide valuable constructability input. Recent Project Experience Summary RAVENSWOOD BUS MAINTENANCE FACILITY, Dania Beach, FL Cost: $32.5 M | Delivery Method: Design-Bid-Build Scope of Work: The scope of this project calls for the phased demolition of the existing, occupied Broward County Ravenswood Bus Maintenance Facility and the construction of 167,468 SF multi-story, multi-use double-tee parking structure and 47,320 SF bus maintenance facility. The 249 space parking structure was designed to minimize it’s Carbon Footprint in order to satisfy the requirements for LEED Silver Certification. MIRAMAR READINESS CENTER, Miramar, FL Cost: $19.9 M | Delivery Method: CM At-Risk Scope of Work: This project consists of building a new 102,000 SF Readiness Center Facility to support the training and readiness of the local Army National Guard units serving the region. Located on a 30 acre site within the city of Miramar in Southwest Broward County, the Readiness Center will also include a 456 Privately Owned Vehicles (POV) parking area, a 125,000 SF Military Owned Vehicles (MOV) parking area, storm water retention areas, and other site improvements. The Project has been registered with the U.S. Green Building Council’s (USGBC) to achieve a LEED Silver rating. MIAMI-DADE ISD TRADE SHOPS, Miami, FL Cost: $13.1 M | Delivery Method: Design-Build Scope of Work: This design-build project was the first Miami-Dade County LEED Silver Certified facility utilized by County employees and is now home to the Internal Services Division, Design and Construction Services Division. MIAMI-DADE FIRE RESCUE TRAINING CENTER, Doral, FL Cost: $25.2 M | Delivery Method: Design-Bid-Build Scope of Work: The Construction of 11 buildings and miscellaneous steel structures in a 10 acre mock cityscape setting for advanced training of the Miami-Dade Fire Rescue Department. The main components of this project included a 58,000 SF administration and classroom building, and multiple pre-engineered structural steel and live fire training buildings. The mechanical, electrical and security system scope on this project tied-in to the fire departments existing central energy plant and was completed without any disruption of service to the existing headquarters facility or the Miami-Dade County Emergency Operations Center. Years of Experience MCM: 8 years Other Firms: 0 years Current Assignment Ravenswood Bus Maintenance Facility 100% Availability for this Project Education Bachelor of Science in Construction Management, Florida International University, 2015 Registrations & Professional Affiliations • AGC Certification of Management-Building Information Modeling (CM-BIM) • Autodesk Revit Architecture 2011 Essentials, 24 hr • Autodesk Navisworks Manage 2013 Essentials, 16 hrs PRE-CONSTRUCTION STAFF EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 27Construction with a Personal Touch CONSTRUCTION SERVICES STAFF Mr. Fernandez has over 20 years of ex- ecutive managerial experience in the construction industry. He has managed and supervised a wide range of proj- ects that include jobs in the education- al, municipal, multi-Story residential, healthcare and aviation market sectors. For MCM he serves as the Director of General Construction, overseeing all building operations in the Florida market. For the Government Center An- nex at Collins Avenue Project, Mr. Fernandez will pro- vide overall management, direction and administration, including serving as a liaison to the College. Joe is a seasoned construction professional with a proven track record of delivering results on schedule and within bud- get; he is a State of Florida Certified G.C., a US Army Corps of Engineers certified QC Manager, and a retired US Navy SEAL. Joe Fernandez Project Executive Ove r s i g h t Jorge Munilla President / Principal-in-Charge Partnering Juan Campos Project Manager Mike Verwey Project Engineer Tony Manning General Superintendent Eddie Matrinez Safety Manager Erick Valderrama Pre-Construction Manager PRECONSTRUCTION CONSTRUCTION JORGE MUNILLA President/Principal-in-Charge Mr. Munilla provides leadership and oversight of the day-to-day operations for all Construction, Project Management and Proj- ect Administration activities. Mr. Munilla’s duties for the Govern- ment Center Annex at Collins Avenue Project includes guaranteeing owner sat- isfaction, establishing the safety and quality cul- ture for the team, and ensuring successful project completion. Mr. Munilla is a Certified General Contractor and is actively involved in several or- ganizations in the construction industry such as the Latin Builders Association and he is a past president of the South Florida Association of General Contractors. A/E LEGEND JOE FERNANDEZ Project Executive Office Support Staff Field staff Armando Perez, P.E. Chief Estimator * See Pre-Construction Staff Experience Tab for complete resumes. Ruben Bravo LEED Manager/Sustainable Construction Jorge Mejia, CM BIM BIM Coordinator CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 28Construction with a Personal Touch Years of Experience MCM: 6 years Other Firms: 20 years Current Assignment Seminole Theatre 100% Availability for this Project Education Bachelor of Science in Construction Management, Florida International University 1999 Registrations & Professional Affiliations • OSHA 30 Hour • Primavera Project Management (P6) Software Advanced User • CPR/First Aid Certified Juan Campos, Project Manager Summary of Qualifications Juan Campos is a proactive, results-oriented Senior Project Manager with 26 years of comprehensive experience in complex construction projects in the parking garage, education, commercial and institutional market sectors. Juan is a graduate of Florida International University, and is OSHA 30 hour certified. He is responsible for overall project coordination and supervision including, coordination of all logistics for project start-up, instilling and ensuring a safe project environment, assuring that all project documentation are kept and maintained, and attending regular meetings with the project owner to address critical items and maintain a positive and professional relationship. Juan is a proven team leader who generates positive results while maintaining quality control and safety objectives. Relevant Project Experience Summary NORMAN S. EDELCUP SUNNY ISLES BEACH K-8, Sunny Isles Beach, FL Cost: $31.6 M | Delivery Method: CM At-Risk Scope of Work: Construction Management at Risk of a new 165,000 SF Multi-story K-8 Facility designed to house 1,642 student stations on 2.1 acres in the City of Sunny Isles Beach. This fast-track three phase project consisted of multiple GMP packages which were issued for demolition of an existing apartment building, construction of the new schools extensive foundations and a shell and finish package. Under the final GMP package, a new 4-story pre-cast double-tee parking garage with 145 parking spaces was constructed. The ground level of this garage included spaces for housing Physical Education Areas, an emergency generator, fire sprinkler control and mechanical chiller rooms. AVENTURA GOVERNMENT CENTER PARKING EXPANSION, Aventura, FL Cost: $3.8 M | Delivery Method: Design-bid-Build Scope of Work: This project involved the demolition of an existing parking lot and the construction of a new precast parking garage with a capacity of 207 cars. Scope included precast concrete parking structure, storefront curtain walls, site work, concrete sidewalks, signage, elevators, and landscaping. All MEPF systems were integrated with the existing City Hall Building. MIAMI-DADE ISD WEST LOT MULTI-USE PARKING FACILITY, Miami, FL Cost: $15.4 M | Delivery Method: Design-Build Scope of Work: The ISD West Lot Project was MCM’s second Design-build Project for Miami-Dade County General Services Administration and achieved a LEED Gold Certification. This 6-story pre-cast parking facility occupies the entire 1.73 acre project site and is comprised of 810 parking spaces dispersed across 324,000 SF of parking area; additionally, 45,000 SF of office space on four floors, plus 10,000 SF of retail space on the Ground Floor were also constructed. MIAMI-DADE FIRE RESCUE TRAINING CENTER, Doral, FL Cost: $25.2 M | Delivery Method: Design-Bid-Build Scope of Work: The Construction of 11 buildings and miscellaneous steel structures in a 10 acre mock cityscape setting for advanced training of the Miami-Dade Fire Rescue Department. The main components of this project included a 58,000 SF administration and classroom building, and multiple pre-engineered structural steel and live fire training buildings. The mechanical, electrical and security system scope on this project tied-in to the fire departments existing central energy plant and was completed without any disruption of service to the existing headquarters facility or the Miami-Dade County Emergency Operations Center. CONSTRUCTION STAFF EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 29Construction with a Personal Touch CONSTRUCTION STAFF EXPERIENCE Years of Experience MCM: 12 years Other Firms: 14 years Current Assignment Ravenswood Bus Maintenance Facility 100% Availability for this Project Education Bachelor of Science in Construction Management, Florida International University 1986 Registrations & Professional Affiliations • OSHA 30 Hour • CPR/First Aid Certified • Certified General Contractor, Florida # CGC 07184 • Mold/Moist Infill Awareness Tony Manning, General Superintendent Summary of Qualifications Tony Manning brings more than 26 years of construction industry supervisory experience. He has particular expertise in the construction of Educational, Commercial, and Historical Restoration projects. He is a State of Florida Certified General Contractor and member of the American Society of Civil Engineers. Tony is results oriented and drives productivity, quality control, and safety standards while delivering the projects on schedule and within budget. Relevant Project Experience Summary MIAMI SENIOR HIGH SCHOOL, Miami, FL Cost: $54.4 M | Delivery Method: Design-Bid-Build Scope of Work: This project included comprehensive improvements to all building systems and interior finishes; the construction, tie-in, testing and commissioning of a new Central Energy Plant; the construction of three (3) new classroom buildings; significant low voltage/data system upgrades; major landscaping improvements; and a total retrofit and upgrade of both the auditorium and gymnasium. Pedestrian traffic was re-routed dozens of times, without a single safety incident involving students, faculty, staff, or visitors to the campus. The campus underwent numerous improvements, including upgrades to the courtyard spaces, comprehensive landscaping upgrades, and improvements to both athletic fi elds and parks. When completed in early 2014, the school’s capacity was increased from 1,649 to 2,800 student stations. This project included the construction of a 204 space, 94,000 SF, 3-story parking garage. NORMAN S. EDELCUP SUNNY ISLES BEACH K-8, Sunny Isles Beach, FL Cost: $31.6 M | Delivery Method: CM At-Risk Scope of Work: Construction Management at Risk of a new 165,000 SF Multi-story K-8 Facility designed to house 1,642 student stations on 2.1 acres in the City of Sunny Isles Beach. This fast-track three phase project consisted of multiple GMP packages which were issued for demolition of an existing apartment building, construction of the new schools extensive foundations and a shell and finish package. Under the final GMP package, a new 4-story pre-cast double-tee parking garage with 145 parking spaces was constructed. The ground level of this garage included spaces for housing Physical Education Areas, an emergency generator, fire sprinkler control and mechanical chiller rooms. WESTLAND HIALEAH SENIOR HIGH SCHOOL, Hialeah, FL Cost: $51.4 M| Delivery Method: CM At-Risk Scope of Work: Design-Build of a new 322,084 SF Senior High School complex composed of multiple buildings and paved courtyards with a capacity of 1,839 student stations. One of the key components of the project was a multi-story 154,000 SF parking garage with 288 parking spaces that incorporated a rooftop gymnasium classrooms and other conditioned spaces; along with open air hard courts for basketball, volleyball and other sports, also on the rooftop of the multi-story parking garage. 10TH ST. AUDITORIUM & BEACH PATROL HEADQUARTERS, Miami Beach, FL Cost: $6.6 M | Delivery Method: CM At-Risk Scope of Work: This project consists of the partial restoration, renovation and addition to existing two-story Auditorium/Beach Patrol Headquarters facility, improvements to accessibility, life safety and partial site improvements included. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 30Construction with a Personal Touch Michael Verwey, Project Engineer Summary of Qualifications Michael Verwey is a proactive, results-oriented Project Engineer with 9 years of comprehensive experience in complex construction projects in the residential and commercial market sectors. Michael is a graduate of Florida International University. He assists the entire project team, working directly with the Project Manager and Superintendent assisting in contract administration and coordination of work. Some of his specific project job tasks include, coordinating and reviewing all submittals for compliance with Contract Documents and schedule, generating and maintaining RFI’s and meeting minutes, coordinating and monitoring material/equipment deliveries of long lead items for compliance with schedule and approved submittals, reviewing and submitting all O&M Manuals and Close-Out Documents, assisting superintendent with quality control, and assisting Project Manager with schedule updates, preparation of requisitions and other duties as requested. Michael is a team player with great organizational and communication skills, who is dedicated to the successful on-time completion of his/her projects. Relevant Project Experience Summary HOMESTEAD CITY HALL, Homestead, FL Cost: $25.5 M | Delivery Method: Design-Bid-Build Scope of Work: The project consist of building an 84,000 SF, 3-story City Hall , including Council Chambers with fixed-seating for over 250 people; Emergency Operations Command Center; Offices for the Mayor, City Manager, and Council Members; New Building Department, Public Works Department, and other administrative and government support spaces; site utility work, including the construction of over 2,500 LF of 15” to 24” HDPE drainage pipe; a 140,000 SF exterior concrete plaza; 3,000 SF exterior structural arcade; misc. Hardscapes and landscaping. MIAMI INTERNATIONAL AIRPORT MCC-8-10 - MISC. CONSTRUCTION CONTRACTS, Miami, FL Cost: $80.1 M | Delivery Method: CM At-Risk Scope of Work: The Miscellaneous Construction Cost (MCC) is a Program created specifically for quick turn-around projects. It is designed to give CSBE firms the opportunity to perform work at MIA and the County’s five other airports. Emphasis of the Program is to assist the small firms to succeed and grow through their MCC experience. MCC is unique because it focuses on the small contractor by dividing projects into trade packages. This procedure allows for packages by trade to be smaller, therefore not requiring a bond in most cases. The CSBE’s are able to receive training in any area of construction from preparing bids, schedules, as well as other documents and forms. This training can be done one-on-one as requested, or through the seminar provided throughout the contract. As an added feature, the Construction Licensing Board usually certifies the seminars and Continuing Education credits are given. Contracts Competed at MCC include: Midfield Fire Station, Aero Mexico Office MIAMI INTERNATIONAL AIRPORT MCC PO 14 MIA HOTEL LOBBY PUBLIC SPACE RENOVATION, Miami, FL Cost: $2.9 M | Delivery Method: CM At-Risk Scope of Work: Architectural, structural, mechanical, plumbing, electrical, life safety, and finish work. Years of Experience MCM: 3 years Other Firms: 6 years Current Assignment Homestead City Hall 100% Availability for this Project Education B.S. in Liberal Studies, Minor in Construction and Business Management Florida International University Registrations & Professional Affiliations • OSHA 10-Hour • OSHA 30-Hour • Fork Lift Operator • Evacuation Competent Person • Qualified Rigger • CPR/First Aid • Scaffold Competent Person • Confined Spaces Training • AWP - Scissor/Boomlift • Qualified Signal Person • Primavera P6 Basic & P6 Intermediate CONSTRUCTION STAFF EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 31Construction with a Personal Touch Years of Experience MCM: 13 years Other Firms: 5 years Current Assignment Ravenswood Bus Maintenance Facility 100% Availability for this Project Education Bachelor of Science in Construction Management, Florida International University 2001 Registrations & Professional Affiliations • OSHA 500 Hour • CPR/First Aid Certified • USACE Construction Quality Manager • Dept. of Environmental Protection - Storm Water/ Erosion Control Certified Inspector/Instructor • Intermediate & Advanced Maintenance of Traffic Supervisor • FDOT Flagger Training • OSHA Competent Person Training • Scaffold • Excavation • Confined Space • Fall Protection Eddie Martinez, Safety Manager Summary of Qualifications Eddie Martinez oversees and controls Corporate Safety Compliance for all MCM Projects. He manages a staff of qualified Safety Managers and Representatives on each project that report directly to him. Eddie and his team conduct weekly safety meetings at all job sites and routinely perform random safety inspections in order to enforce the highest standards of safety at all times. Eddie is a strong communicator and is continuously looking for ways to improve policies and procedures at MCM, where safety is already a firm cornerstone of the corporate philosophy. Among his many Certifications are those for OSHA-500 and Maintenance of Traffic-Advanced, as well as, the United States Army Corp of Engineers Quality Control Manager designation. Relevant Project Experience Summary NORMAN S. EDELCUP SUNNY ISLES BEACH K-8, Sunny Isles Beach, FL Cost: $31.6 M | Delivery Method: CM At-Risk Scope of Work: Construction Management at Risk of a new 165,000 SF Multi-story K-8 Facility designed to house 1,642 student stations on 2.1 acres in the City of Sunny Isles Beach. This fast-track three phase project consisted of multiple GMP packages which were issued for demolition of an existing apartment building, construction of the new schools extensive foundations and a shell and finish package. Under the final GMP package, a new 4-story pre-cast double-tee parking garage with 145 parking spaces was constructed. The ground level of this garage included spaces for housing Physical Education Areas, an emergency generator, fire sprinkler control and mechanical chiller rooms. WESTLAND HIALEAH SENIOR HIGH SCHOOL, Hialeah, FL Cost: $51.4 M | Delivery Method: Design-Build Scope of Work: Design-Build of a new 322,084 SF Senior High School complex composed of multiple buildings and paved courtyards with a capacity of 1,839 student stations. One of the key components of the project was a multi-story 154,000 SF parking garage with 288 parking spaces that incorporated a rooftop gymnasium classrooms and other conditioned spaces; along with open air hard courts for basketball, volleyball and other sports, also on the rooftop of the multi-story parking garage. AVENTURA GOVERNMENT CENTER PARKING EXPANSION, Aventura, FL Cost: $3.8 M | Delivery Method: Design-bid-Build Scope of Work: This project involved the demolition of an existing parking lot and the construction of a new precast parking garage with a capacity of 207 cars. Scope included precast concrete parking structure, storefront curtain walls, site work, concrete sidewalks, signage, elevators, and landscaping. All MEPF systems were integrated with the existing City Hall Building. MIAMI-DADE ISD WEST LOT MULTI-USE PARKING FACILITY, Miami, FL Cost: $15.4 M |Delivery Method: Design-Build Scope of Work: The ISD (formerly GSA) West Lot Project was MCM’s second Design- build Project for Miami-Dade County Internal Services Department and achieved a LEED Gold Certification. This 6-story pre-cast parking facility occupies the entire 1.73 acre project site and is comprised of 810 parking spaces dispersed across 324,000 SF of parking area; additionally, 45,000 SF of office space on four floors, plus 10,000 SF of retail space on the Ground Floor were also constructed CONSTRUCTION STAFF EXPERIENCE CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 32Construction with a Personal Touch PROJECT MANAGEMENT SERVICES DESIGN REVIEWS MCM will work closely with the A/E of Record to evaluate the refinement of the progress drawings during the design phase. Our team shall provide an analysis of selected building systems, products, material selections, location of major MEP space and an analysis of existing conditions. We will review space limitations, tolerances and check on drawing coordination. MCM will provide recommendations and coordinate regular constructability review meetings with the Architect, providing a complete design analysis upon receipt of 30% drawings, after the completion of 60% drawings and prior to issuing 90% drawings for the city of Sunny Isles Beach GMP review. MCM incorporates the required design review times into the schedule with anticipated durations for addressing the City’s comments, if any, as well as the anticipated approvals. The monitoring of the reviews in the project schedule becomes our primary tracking tool for all required permits and their status. BUDGET ESTIMATING For the Government Center Annex project, MCM’s Chief Estimator, Armando Perez, P.E., LEED AP BD+C and his team will validate the City’s budget with cost estimates on every phase of design, beginning with schematics, design development and continuing on through 100% construction documents. The City will know at each of these phases where the budget stands. MCM will also provide value engineering options, if necessary, at each of these phases for the City’s consideration. During the Schematic Design Budget Estimate phase, the overall cost format for this project will be established so the intended project components, elements or facilities can be properly tracked during estimate progression. Coordination with the A/E of Record on the use of applicable structure and enclosure systems, material finishes, appropriate mechanical systems for its intended use including pipe materials, sizing and routing will be coordinated with the design team in parallel as the drawings are being developed. This collaboration will ensure the project will meet its intended performance and specification requirements while maintaining cost effectiveness. The Design Development Budget Estimate will be prepared when the design is at approximately 80% complete or as requested by the City. A more detailed quantity takeoff will be involved with fewer assumptions made during the Schematic Design Budget Estimate. At this phase of design, the A/E of Record should still be flexible in implementing design changes to achieve the desired intent. Cost estimates will be provided at each milestone deliverable to ensure compliance with the overall budget. During Progress Deliverable Submissions such as 30%, 60% and 90% construction documents, the Budget Estimate will be fine tuned to address design clarifications and any change that may have occurred DESIGN REVIEW EXAMPLE Miramar Readiness Center – In order to facilitate design coordination and review with the architect, MCM established pre- construction meetings weekly with the design team to ensure all elements were coordinated. In addition, the team held a 2-day design charrette, during which time the Owner, A/E, and MCM met and reviewed each trade’s scope of work. Prior to the charrette, MCM requested that their subcontractors provide any scope related questions they had for coordination with the design team. This list was then provided to the Owner and A/E a week prior to the meeting to allow the team time to become familiar with the questions prior to discussions. During the charrette, MCM invited key subcontractors into the meeting at designated times, facilitating a discussion between all parties to ensure a complete understanding of the design and scope of work. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 33Construction with a Personal Touch PROJECT MANAGEMENT SERVICES during the final design stages including price confirmation. Our team will also work with the City of Sunny Isles Beach on providing a summary of potential alternates with cost estimates during preconstruction. The alternate summary list will provides the client menu options to implement certain materials and/or systems into the project if they so choose. To avoid re-design, MCM commits to partnering with the A/E of Record to provide pricing analysis for major modifications or proposed changes occurring between design phases. Progress will be reviewed bi- weekly throughout the design development process and will also be coordinated appropriately with the City. All constructability comments and/or design changes with cost estimates will be listed in a matrix for tracking and implementation purposes. The matrix will be used as a checklist to ensure each line item’s incorporation into the contract documents. VALUE ENGINEERING MCM’s value engineering methodology is based on our objective to seek out the best value for the City of Sunny Isles Beach. This objective is achieved by identifying alternatives during the design development phase and measuring them against the value of the objectives; in turn recommending and assisting the City and the A/E of Record in selecting the best solutions for the project. Estimating or predicting cost and then controlling cost within the limits of the budget is an essential factor to the success of this project. However, MCM does not use value engineering merely as a cost-cutting mechanism, but as the tool to provide the best balance between cost, scope and performance. MCM’s approach to value engineering is an assurance to the City’s investment. To support this process MCM consults with specialty contractors and fabricators who offer input from the conception of the design. By tapping into the wealth of expertise from MCM’s base of prequalified subcontractors, we are able to provide a more cost effective product prior to the completion of the contract drawings. This provides the team with the ability to control and avoid late value engineering and consequently, changes after the design is finished. This translates into quality assurance, time savings and cost effectiveness. CONSTRUCTABILITY ANALYSIS Our Team members will remain in constant contact throughout the development of design documents. As the design progresses from its conceptual phase on through to the final permit documents, our Team will maintain open channels for communication, and at every step of the design’s development, we will make certain that the Miami Dade Aviation Departments specific project requirements are comprehensively addressed throughout. The Risk Management Plan will be one of the foundation documents for this review, along with regular review sessions of construction system assemblies and material compatibilities. Our personnel will analyze the compatibility, quality, availability, and warranty periods VALUE ENGINEERING EXAMPLE Miramar Readiness Center – This 102,000 SF facility is being constructed in Miramar, FL for the Florida Department of Military Affairs (DMA) to support training and readiness of the local Army National Guard units serving the region. One of the unique aspects of MCM’s involvement on this project, was the firm’s ability to value engineer portions of the design at the Owner’s request, which was required as a result of a disappointing initial completive bid through the State’s Bid System which resulted in average bids approximately 25% over budget. By closely collaborating with the Owner to understand their needs and wants, MCM was able to shave over $6 M off their original bid price, subsequently saving the project from being scrapped due to a lack of funding. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 34Construction with a Personal Touch of all materials. A running matrix log will then be utilized to track the items that have been incorporated into your project’s design. CONSTRUCTION SCHEDULING MCM has an excellent reputation for completing work ahead of schedule. We have never incurred liquidated damages or been penalized for failure to complete a contract in our 30 years of doing business. As a dedicated practitioner of Critical Path Method scheduling and Earned Value Management, our record inspires such confidence that it is not unheard-of for our clients to schedule a major event a their new facility the very same day that construction is due to be completed. MCM uses Primavera P6 to define individual activity relationships, and also to establish and track the project’s Critical Path. The schedule will be cost loaded, and if required, will also include resource loading and subcontractor crew sizes. According to the tenets of Earned Value Management, we will track the ‘burn rate’ for each activity, and will at all times know the exact level of completeness for each individual task, as well as the project’s exact overall level of completion. P6 is capable of generating reports that are configured specifically to the project priorities. We will develop with the City a format appropriate for the reporting needs of this Recreation Center project. BASELINE/MASTER SCHEDULE Our Baseline Schedule is prepared in network form, which will graphically depict the interrelationship and duration of all project activities. Specifically, the following will be shown: ►Permitting Requirements ►Approvals from State and Municipal Authorities ►Project’s Fast Track Phasing ►Long Lead Materials and Equipment ►Major Construction Milestones ►The schedule will be reviewed with the City and our team, forming the basis for monitoring project progress. Once it has been internally peer-reviewed, the Baseline Schedule will be carried forward as the Master Schedule, and any updates will be documented as separate, subsequent files. Shop drawings will be ‘fast-tracked’ whenever possible. One or more MCM staff members will be dedicated exclusively to this task. ‘Processing Drawings’ will be a clearly-defined activity on this Baseline Schedule, and the processing of each individual drawing set will be separate and distinct activities on each subsequent embodiment of the Master Schedule. PROJECT MANAGEMENT SERVICES At the Norman S. Edelcup Sunny Isles Beach K-8 project, due to delays from the utility companies for not removing and relocating existing utilities which encroached within the required work, this project commenced 30 days behind schedule. Because the time impact occurred at the commencement of the project, it allowed our team to utilize our Primavera scheduling software and resequence the project. Re-sequencing the critical items in tandem with the Client, while also working extended hours and weekends; MCM was able to deliver the project on time. MCM’s acceleration efforts and a strategic out of sequence schedule were key elements in the successful delivery of this project on time. Westland Hialeah Sr. High School – This project was located on a low lying 6 acre parcel of which 1 acre was designated a Federal Wetland. This required Federal permits and the purchase of environmental mitigation credits in Everglades National Park prior to commencing work on that acre. To circumvent this constraint, the MCM team isolated and began working around the delayed area. Our schedule had to establish the different areas which required eight separate permits to avoid the impact of the wetland issue. The schedule also had to consider the construction of four buildings on the site based on these permit approvals. MCM had to constantly monitor and revise the schedule whenever these fragmented permit approvals caused delays. Re- sequencing construction activities was done to mitigate the delays. The end result was a timely delivery of the complete project. SCHEDULING EXAMPLES CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 35Construction with a Personal Touch MASTER SCHEDULE UPDATES Throughout the life of the project, the schedule will be used to gauge the impact of scope changes and an-ticipated problems, and to develop strategies for maintaining the overall time frame. The schedule will be updated bi-weekly (more frequently if the City requires) to show actual progress against the project’s baseline schedule expectations. This enables the current status of the project to be rapidly determined, and if the updated schedules indicate a slippage, problem areas are immediately identified and subcontractors are brought together to organize a recovery schedule. COORDINATING SUBMITTALS WITH THE CONSTRUCTION SCHEDULE One of the keys to effective project management is knowing that the procurement process should serve the construction schedule, not the other way around. If work on the jobsite is to proceed smoothly, then the material must reach the project before it is to be installed. Otherwise, the work sequence is interrupted and must be altered to accommodate disjointed delivery schedules. The best way to ensure timely material delivery is to treat the assembly of submittal data, the assembly of shop drawing data, and their procurement as activities, just like the construction activities. These activities will be assigned durations and their relationship to predecessor and successor activities will be clearly defined. SUBCONTRACTOR SCHEDULE ADHERENCE As part of the bidding process, subcontractors are required to review and comply with the milestones established in the Master Schedule. The trade contractors are required to submit schedules for their work that conform to the overall parameters of the Master Schedule, and will be required to cost-load and or crew-load their schedules as necessary to maintain consistency with the Master Schedule. Our team will coordinate these various trade schedules and generate one master CPM schedule, for the project, which includes appropriate sequencing restraints between trades. Monitoring of these schedules and manpower will be a central focus of our weekly subcontractor/jobsite coordination meetings. QUALITY CONTROL For MCM, its commitment to safety and delivering quality projects is one of its highest priorities. So much so, that MCM is one of the few contractors in Florida that has obtained the ISO: 9001 certification. To achieve this certification, a construction manager must meet the stringent requirements of the International Standards Organization (ISO) for procedures and documentation necessary to assure the highest level of quality and customer satisfaction. ISO standards are internationally- recognized as the highest standards for quality control. Throughout construction, MCM’s Project Executive, Joe Fernandez will audit the project to confirm that ISO: 9001 procedures are followed and as part of our quality process, Sunny Isles Beach will be interviewed periodically by MCM to ensure customer satisfaction. MCM believes that its commitment to quality emanates from our fundamental corporate philosophy of delivering total client satisfaction, and our uncompromising commitment to delivering excellence. In our search for continued quality improvement, MCM emphasizes job-specific training, and insists on safe, clean, drug free jobsites. This corporate philosophy ensures that our personnel (MCM’s most valuable resource) have the proper foundation to deliver the standard of quality MCM is known for. PROJECT MANAGEMENT SERVICES “Quality is not an act, it is a habit” - Aristotle MCM understands the need for a growing City like Sunny Isles Beach to build a Government Center Annex, and the need to deliver a safe, functional, aesthetically pleasing product. As such, special attention will be given to delivering the highest level of quality our industry can safely produce at every phase of the project. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 36Construction with a Personal Touch PRE-CONSTRUCTION/ESTIMATING During pre-construction, MCM develops scope sheets defining all the required work per trade. These sheets typically harmonize the estimates and the complete set of documents assuring that there are no oversights while pricing. For the Government Center Annex project, these scope sheets will point out considerations subcontractors should have for existing site conditions, connectivity to existing systems and other items which may not be explicitly defined in the documents, but required for the project. MCM’s project team will thoroughly review these scope sheets to assure there are no scope gaps between disciplines. They will assure the scopes are complete and assigned to the proper trade, avoiding scope gaps and potential cost impacts to the Government Center Annex team. SUBMITTALS Quality Control will be implemented throughout the project, but Quality Assurance comes from verification and documentation of how Quality Control is implemented. Nowhere is this more evident or critical than through the projects’ submittals. MCM views the submittal process as our assurance that the A/E’s designs are implemented flawlessly in the field. Submittals serve to enhance and detail design for each assembly installed in the field, and will bridge the gap between construction documents and physical installations. MCM’s internal reviews are conducted in painstaking detail, verifying submittal compliance with the A/E’s documents. MCM will coordinate numerous workshops with the Design Team for more critical or complex building assemblies such as building envelope and operation systems if necessary. CONSTRUCTION Prior to commencement of an element of work, Juan Campos, Project Manager, and project Superintendent Tony Manning, will meet with subcontractors and/or suppliers, and review the submittals, developing a pre-task plan to assure the highest level of quality is achieved. They will discuss safety, contract requirements, applicable codes and inspections, use of mockups, whether specified or not, and overall coordination. This meeting will be documented by meeting minutes and where coordination with the City of Sunny Isles Beach or the A/E is required, their presence will be requested. Once the pre-task plan is coordinated, work can commence and QA documented through various methods including daily reports, regulatory agency inspections, manufacturers’ reports, or the A/E’s field observations. Copies of all inspection reports including a record of deficient conditions and their correction are maintained electronically in MCM’s servers. Prior to a task being completed, MCM conducts an internal inspection to assure compliance with the Contract Documents and the approved submittals. As-built data is gathered and compiled in PROJECT MANAGEMENT SERVICES Miami-Dade ISD West Lot Multi-Use Facility – To assure the quality of the precast members, MCM provided a panel mockup for review and approval by the Owner and Architect. MCM also would inspect every delivery of the precast double tees and columns before unloading from the truck. The members were inspected for any cracks or imperfections that may have been caused during transportation and to assure it met the precast mockup. Each piece noted was then recorded in a log and re-inspected by the design Engineer before erecting. This avoided any conflicts occurring after the member was already erected. Miami Senior High School - A specific example of the success of our quality control system occurred in the planning of the parking garage foundations and civil underground work at Miami High School. In this example, careful overlay of the new structural foundation components and civil underground systems were completed to find that major conflicts existed between the civil and structural design. Had this design flaw not been identified, this could have resulted in major costs for fabricating new civil structures or re-work of new structural foundations. The result of notifying the design team of these conflicts, allowed redesign of the civil package and ability to maintain the existing structural design, saving the Owner tens of thousands of dollars in re-work. QUALITY CONTROL EXAMPLES CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 37Construction with a Personal Touch our field office; and are verified for completion weekly by MCM’s Project Engineer, who maintain logs of the updates. As part of our ISO: 9001 procedures, the MCM Project Team will have a weekly job-site walk to review the quality of work in place. An ongoing punchlist is generated and sent to the subcontractors who have one week to correct the deficient work before the following weekly jobsite walk. POST-CONSTRUCTION Once the City of Sunny Isles Beach and the A/E recognizes the project as substantially complete MCM will finalize the compilation of closeout documents which will include as-builts, warranties and other documents beneficial to City’s facilities managers. At the end of post-construction, following completion of the warranty phase, MCM will complete it’s ISO: 9001 procedures by interviewing the City of Sunny Isles Beach one final time to assess their overall satisfaction with MCM’s performance. In doing so MCM will be able to measure, analyze and improve its processes for future City projects. COST CONTROL During construction, MCM constantly monitors budgets and tracks job costs in real time, so we are always aware of the project’s financial status. When initial budgets are developed, MCM analyzes the design for exposures. Based on our previous experience and archival data, we will forecast exposures and established Owner controlled contingencies to address unforeseeable issues such as utility conflicts, dewatering, environmental contamination remediation, etc. Historically, MCM has found that these Owner controlled contingencies offer the project team the latitude to address cost increases expeditiously and within the budget. Should an unforeseen condition be encountered which requires an adjustment to a subcontractors scope, MCM will solicit pricing from the vendor and analyze the costs via internal estimates to assure competitive pricing guidelines are followed. MCM also utilizes unitary pricing schedules as part of a subcontractor’s negotiated agreement for an additional cost control measure. In this instance, MCM will secure unit pricing with bids and prior to contracting, whenever possible, to assure competitive pricing for additive or deductive changes. This approach offer is best used to minimize our clients’ exposure to changes. Another proven cost control approach is to analyze proposed MEP and structural systems with our MEP and structural sub-consultants during the early phases of the project. These are key areas where the greatest cost impacts are often suffered. Our 31 year history in South Florida means that MCM knows the local market, and has allowed us to develop strong relationships with the local subcontractor pool. They will collaborate with our team to offer beneficial analysis of proposed and existing systems, and to verify their compatibility. We also will consult with such key subcontractors in order to validate the costs. DIRECT PURCHASE ORDER PROGRAM (DPO) In addition to the cost control/cost savings methodology already mentioned, another method frequently used by MCM to capture cost savings would be to implement a Direct Purchase Order Program (DPO) in which the Owner buys materials direct from the vendor for potential tax savings. We have done this successfully over the past 3 years with City of Homestead, Miami-Dade County Public Schools, Miami-Dade Water & Sewer, and Miami-Dade County ISD realizing over $3 million in total savings. With our past experience in successfully managing this program, MCM will be able to guide the City through this process should they choose to pursue this option. PROJECT MANAGEMENT SERVICES CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 38Construction with a Personal Touch CLAIMS MANAGEMENT Quite commonly, the potential for disputes is originated during the pre-construction phase because of ambiguities, conflicts, errors or omissions in the construction documents. During the construction phase resolution of small claims are frequently ignored or postponed only to collect and combine into complex issues at the end of the project. As time elapses, memories become obscure and people move, further clouding the issues. The incidents or conditions which give rise to claims generally fall into two categories or a combination of the two - delays and/or damages. Delays usually result in associated damages while damages alone can be the result of other causes. The greatest determining factor in successful claims resolution is building a positive relationship between all parties involved. MCM strongly believes in the Partnering Process, which provides a instrument for effective issue resolution where the involved parties can come to an agreement to resolve problems at the lowest possible levels. When the client and the contractor work as allies, changes are identified and the client and project team can discuss alternatives and arrive at equitable solutions. Measurable benefits result from this approach in terms of minimizing cost growth and the possibility of schedule delays, as well as maximizing the quality of the finished product. A Claims Management Program (CMP) can be implemented to minimize costly disputes, potential contract default, and litigation. To avoid these pitfalls the time to initiate a CMP is at commencement of the project. It should continue for the duration of the project, and should include the following elements: ►First and Foremost is the development of a complete and cohesive Project Team. For this project, this includes the proper integration of the designers and the contractor’s management personnel. Key to this relationship is the identification of personnel. ►A review of construction documents for completeness, ambiguities, conflicts and legal correctness. Subcontractors are key elements during the design, bringing VE and proper pricing. ►The development of field procedures and a document control system with particular emphasis on cost management. ►The definition and implementation of adequate scheduling procedures. This should include recording as-built information as well as maintaining an as-planned schedule. Integration of the sub’s schedules and knowledge is critical to the understanding of the pace of the job. ►The establishment of a system for analyzing, negotiating and resolving claims expeditiously. ►The education of field personnel to recognize and report potential claims situations before formal disputes develop. Emphasis should be placed on comprehensive documentation of conditions leading to potential real claims. ►Resolve issues at the lowest management level possible. ►Timely notification to the City of unforeseen conditions or issues that may be outside the scope of work. ►Take advantage and apply lessons learned from our on-going and past partnering charters. ►Take advantage of the design-build process that provides an inherent approach to the elimination of claims. PROJECT MANAGEMENT SERVICES CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 39Construction with a Personal Touch PROJECT CLOSE-OUT MCM firmly believes that project closeout is as important as pre-construction and construction services. We begin the closeout procedure during pre-construction and start of the construction phase of the project, establishing certain guidelines and requirements to ensure that subcontractors and suppliers complete all aspects of the project. Project Closeout consists of several steps. First, during all stages of the project, MCM creates deficiency lists of items that are pending and/or deficient prior to substantial completion. We submit this list to the corresponding sub-contractor with a time frame to complete. Once that deficiency list is completed and Substantial Completion is secured, MCM along with the City of Sunny Isles Beach, and the A/E of Record create a punch list that will contain minor items, since MCM will have been correcting deficient items through our quality control program, throughout construction. The completion of this list is a priority and is done expeditiously so that stakeholders can begin taking over areas of the airport without disruptions. Second is the Closeout Documents. Closeout documents consist of product literature, warranties/guarantees, maintenance manuals and a list of subcontractors with their contact information to name a few. These documents are submitted in tabbed binders to facilitate the City’s follow up process in the future. Included in the closeout documents are the as-builts. During Construction MCM requires subcontractor, as normal course of business, to update as-builts on a weekly basis. At the end of the project as-built are updated and sent together to the owner with all closeout documents. Lastly, MCM prepares a training program for operating and maintaining all major facility systems. This program, which is tailored specifically for the City of Sunny Isles Beach, will include subcontractors with specific expertise on their installed systems and videotaped by MCM for future reference by facility operating personnel. MAINTENANCE & WARRANTY WORK At the beginning of the project MCM will establish maintenance and warranty programs which will set requirements for consultants, contractors, and suppliers regarding the maintenance and operation of systems and facilities. This program content shall be considered the foundation of the Operations and Maintenance (O&M) system. MCM will then follow these program requirements through the procurement process via Primavera Expedition, our document control system, to make sure that contracts are written with specific obligations for maintenance and warranties. This will ensure that the City will receive immediate service for any issues that may arise during the warranty period. POST WARRANTY MCM has a commitment to stand by our product. In the event that an issue arises after the warranty period has expired, MCM will review the matter on a case by case basis to determine if the warranty should be extended to cover the issue. As stated previously in our proposal, MCM is dedicated to total client satisfaction with an uncompromising dedication to quality, and we will continue to service the client, even after project completion until your complete satisfaction has been achieved. PROJECT MANAGEMENT SERVICES Post Construction Training for County Employees at the S-808 Electrical Distribution System project. CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 40Construction with a Personal Touch LOCATION OF OFFICES As a well established locally headquartered construction manager submitting a response to this request for qualifications, MCM has access to personnel and resources that cannot be matched by our competition. With our Corporate Headquarters 25 miles away and our Broward County office 11 miles from the Sunny Isles Beach Government Center Annex project, the City will have full access to the top level of MCM’s leadership on a moments notice. For the Government Center Annex project, MCM will assign personnel from the following locations: CORPORATE OFFICE 6201 SW 70th Street, Second Floor Miami, FL 33143 Phone: 305-541-0000 Fax: 305-541-9771 BROWARD OFFICE 5201 Ravenswood, Suite 111 Dania Beach, FL 33312 Phone: 954-691-9899 Fax: 954-362-7638 MCM EMPLOYEES BY JOB FUNCTION JOB FUNCTION QTY Clerical Personnel 57 Engineers & Architects 36 Managers, Superintendents, or Foremen 120 Skilled Employees & Technicians 128 Estimators 21 Unskilled Employees 73 Total Number of Full Time Personnel 435 CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 41Construction with a Personal Touch CLAIMS AND LITIGATION HISTORY LEGAL HISTORY MCM prides itself on focusing its efforts on resolving all claims and disputes amicable, without resorting to litigation or arbitration. Nevertheless, having been in business for over 31 years, legal disputes have been ultimately unavoidable. Below, we have provided a list of cases brought by or against MCM during the last five (5) years: CASE NUMBER PROJECT PLAINTIFF DEFENDANT CLAIM DISPOSITION OF MATTER 10-19272 CA 09 N/A Doors Adquisition LLC Munilla Construction Mgmt Corp Unjust enrichment Dismissed 10-32690 CA 06 N/A Chery, Clara A Isolano, William Third party auto claim – Negligence Dismissed 10-35169 CA 05 N/A Durden, Melvina State of Fla (DOT)Third-Party auto claim - Negligence Settled 10-36175 CA 22 Miami Senior High Barrios, Rosmel Munilla Construction Mgmt, LLC 4th Tier Worker’s Compensation claim – Medical Bills Dismissed (Attorney's fee to MCM) 10-61979 CA 01 South Point Park City of Miami Beach (The) Hargreaves Associates Inc Breach of contract against architects for design defects. City of Miami Beach has acknowledged not having provided MCM notice to cure for deficiencies and the City has been unable to cite any construction defects on the part of MCM. Pending 11-27956 CA 04 I-95 Managed Lanes Maldonado, Milton R Munilla Construction Mgmt, LLC Labor Class Code Claimant alleging that he was performing work under a different labor code Settled 11-37425 CA 27 S-808 EDS Star Paving Corp.MCM, LLC Unjust enrichment Dismissed with Prejudice 11-44032 CA 22 MDFR Jose D. Mitrani, P.E. Munilla Construction Mgmt, LLC Breach of Oral Contract or Contract Implied in Fact against MCM by the Owner's scheduling consultant who claims to have worked directly for MCM Pending 12-1583 CA 34 N/A De La Hoz, Jose M MCM CORP Breach of verbal contract and unjust enrishment Dismissed 12-19623 CA 08 N/A Bank United Munilla Construction Mgmt, LLC Accounts Stated; Open Account; Unjust Enrichment Dismissed with Prejudice 12-42302 CA 20 Miami Senior High Juan R. Martinez Miami-Dade County et al. Trip and Fall - Occurred after project completion under Owner occupancy Settled 12-5224 CA 27 N/A Concrete Holdings & Srvcs LLC Munilla Construction Mgmt, LLC Claim for payment. Third tier subcontractor that went bankrupt Dismissed with Prejudice 12-14972 CA 25 N/A Seneck Theodule Eliker Talabert et al.Third party auto claim – Negligence Pending 12-17260 CA 20 Miami Int'l Airport NTI Allstates Fireproofing Inc Fidelity & Deposit Co of Maryland Breach of Contract/Payment Bond Dismissed with Prejudice 12-17268 CA 32 Miami Int'l Airport NTI Allstates Fireproofing Inc Travelers Casulaty and Surety Co of America Breach of Contract/Payment Bond Dismissed with Prejudice CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 42Construction with a Personal Touch CASE NUMBER PROJECT PLAINTIFF DEFENDANT CLAIM DISPOSITION OF MATTER 13-06276 N-8 N/A Sheena Lewis Greenwich Insurance Company, et al. Third-Party auto claim - Negligence Settled 13-1613 CA 25 N/A Dyms Beaucejour Eliker Talabert et al.Third party auto claim – Negligence Pending 13-014605 CA 25 N/A Arsene Joseph Eliker Talabert et al.Third party auto claim – Negligence Pending 13-14778 CA 25 Heft II Ranger Construction Industries, Inc. Munilla Construction Mgmt, LLC et al. Contractual Dispute between Parties Voluntarily Dismissed and Subsequently Settled 13-30947 CA 11 Port of Miami Cruise Terminal D A.C.N. Roofing, LLC Munilla Construction Mgmt, LLC, et.al. Claim for payment irrespective of subcontractor's failure to furnish requisite warranties Dismissed with Prejudice 14-2390-P N/A Ezra Lee Compton, et. al. Munilla Construction Mgmt, LLC Breach of fiduciary duty Pending CC-14-04539-A N/A Munilla Construction Mgmt, LLC Ronald Krause and Linda Krause Breach of Lease Agreement Settled 14-005230 CA 24 Red Road North/South Southeastern Engineering Contractors, Inc. Munilla Construction Mgmt, LLC, et.al. Contractual dispute between parties Pending 14-10141 CA 30 N/A RJR Construction, Inc. Munilla Construction Mgmt, LLC Breach of contract by third party beneficiary Pending 14-16553 CA 06 Hialeah Reverse Osmosis Commercial Cool Temp Corp Hialeah Water LLP, et. al.Payment Bond Pending 15-20307-CIV Site 1 Munilla Construction Mgmt, LLC The Hanover Insurance Company, Inc. Breach of Contract, Declaratory Releif, Unjust Enrichments, and Promissory Estoppel Dismissed Without Prejudice 15-4267 CA 01 N/A Munilla Construction Management, LLC Miami-Dade Expressway Authority Bid Protest Appeal 01-SC-15-00181 N/A Christopher J. Dugas Munilla Construction Mgmt, LLC Third Party Auto Cliam - Negligence Settled CACE15008713 (18) Ravenswood Bus Maintenance Facility Titan Florida, LLC Munilla Construction Mgmt, LLC, et.al. Bond Claim Pending 15-cv-20307 N/A The Hanover Insurance Co. Munilla Construction Mgmt, LLC Dispute as to the ownerhsip of Sheetpiling Materials Pending 3D15-2066 N/A Munilla Construction Management, LLC Miami-Dade Expressway Authority, et al. Appeal Pending CLAIMS AND LITIGATION HISTORY CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 43Construction with a Personal Touch FORMS AND ATTACHMENTS CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 44Construction with a Personal Touch FORMS AND ATTACHMENTS CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 45Construction with a Personal Touch FORMS AND ATTACHMENTS CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 46Construction with a Personal Touch FORMS AND ATTACHMENTS CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 47Construction with a Personal Touch FORMS AND ATTACHMENTS CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 48Construction with a Personal Touch FORMS AND ATTACHMENTS CM A R fo R G ov e RnMen t C en t e R A nn e x At 1 8 0 8 0 C ol l i n s A ve n u e | R eq u e s t fo R quAli f i CA ti o n s | no. 1 5 - 0 8 - 0 2 49Construction with a Personal Touch FORMS AND ATTACHMENTS