HomeMy WebLinkAboutReso 2015-2473 RESOLUTION NO. 2015- 21.1 ti 3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDERS NO. 2 AND 3 TO THE AGREEMENT WITH FLORIDA ENGINEERING AND DEVELOPMENT CORPORATION, TO PROVIDE PROFESSIONAL CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF THE 174 STREET ROADWAY IMPROVEMENT PROJECT, IN AN AMOUNT NOT TO EXCEED THREE HUNDRED SIXTY-SEVEN THOUSAND TWENTY- EIGHT DOLLARS AND FIFTY-FIVE CENTS ($367,028.55), ATTACHED HERETO AS EXHIBIT "A" AND "B" RESPECTIVELY; AUTHORIZING THE CITY MANAGER TO DO. ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on April 16, 2015 via Resolution No. 2015-2401 the City Commission awarded Bid No. 14-11-01 to and entered into an Agreement with Florida Engineering and Development Corporation for Professional Construction Services for the construction of the 174th Street Roadway Improvements Project, in an amount not to exceed Two Million Nine Hundred Sixty-Five Thousand Seven Hundred Fifty Dollars and Twenty Cents ($2,965,750.20); and WHEREAS, the City now needs additional sidewalk and curb repair/construction done to the 174th Street corridor extending from Collins Avenue to the western terminus of the right- of-way; and WHEREAS, the City being satisfied with the professional construction services provided by Florida Engineering and Development Corporation, and who has expressed its ability and desire to provide these services, desires to amend the Agreement; and WHEREAS, the City Commission wishes to approve Change Order No. 2 to the Agreement with Florida Engineering and Development Corporation for additional Professional Construction Services for the 174th Street Roadway Improvements Project, in an amount not to exceed Two Hundred Eight Thousand Five Hundred Thirty-Seven Dollars and Fourteen Cents ($208,537.14), attached hereto as Exhibit "A"; and WHEREAS, based on a request from the City of North Miami Beach (NMB), the City has agreed to restore the water lines for the 174th Street corridor extending from Collins Avenue to the western terminus of the right-of-way; and WHEREAS, during the course of the 174th Street Roadway Improvements Project, at least two (2) of the seven (7) water service lines on 174th Street need to be replaced, with the possible need to replace the remaining water service lines once said lines are excavated and exposed in the coming phases of the 174th Street Roadway Improvements Project; and WHEREAS, NMB owns and is responsible for the water service lines in the corridor of the 174th Street Roadway Improvements Project; and R2015-Fla Engineering CO 1 and 2 to Agmt 174 St Construction Srvs Page 1 of 3 WHEREAS, NMB has agreed to reimburse the City's costs, on a per service line replacement basis, up to a maximum of seven (7) service lines, in an amount of Twenty-Two Thousand Six Hundred Forty-One Dollars and Sixty-Three Cents ($22,641.63) per line, with a combined total not to exceed amount of One Hundred Fifty-Eight Thousand Four Hundred Ninety-One Dollars and Forty-One Cents ($158,491.41); and WHEREAS, the City Commission wishes to approve Change Order No. 3 to the Agreement with Florida Engineering and Development Corporation for additional Professional Construction Services for the 174th Street Roadway Improvements Project, in an amount not to exceed One Hundred Fifty-Eight Thousand Four Hundred Ninety-One Dollars and Forty-One Cents ($158,491.41), attached hereto as Exhibit ."B", for a total amount not to exceed Three Hundred Sixty-Seven Thousand Twenty-Eight Dollars and Fifty-Five Cents ($367,028.55), bringing the total contract not to exceed amount to Three Million Three Hundred Thirty-Two Thousand Seven Hundred Seventy-Eight Dollars and Seventy-Five Cents ($3,332,778.75). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Orders No. 2 and 3 to the Agreement. The City Commission hereby approves Change Orders No. 2 and 3 to the Agreement with Florida Engineering and Development Corporation for Professional Construction Services for the construction of the 174th Street Roadway Improvements Project, in a total amount not to exceed Three Hundred Sixty-Seven Thousand Twenty-Eight Dollars and Fifty-Five Cents ($367,028.55), attached hereto as Exhibit "A" and "B" respectively. Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. • Section 3. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 15th day of October 2015. ` . Georg- '. Scholl, Mayor • ATTEST: . - s .:::-Sk;i:"").-1 . . . Jane A. Hines, MMC, City Clerk ; - I R2015-Fla Engineering CO 1 and 2 to Agmt 174 St Construction Srvs Page 2 of 3 Approved As to Form and Legal Sufficiency: // ,4( ( Hans• • •t , '_'ty Attorney Moved by: r l L\p A) � Seconded by: (.14Dywo cJ 110 Vote: Mayor Scholl ✓(Yes) (No) Vice Mayor Gatto (Yes) (No) Commissioner Aelion Yes) (No) Commissioner Goldman Yes) (No) Commissioner Levin (Yes) (No) R2015-Fla Engineering CO 1 and 2 to Agmt 174 St Construction Srvs Page 3 of 3 SJ$NY jste • i A. `� � CONTRACT u y = CITY OF . °°�=== w SUNNY ISLES BEACH SF, 9I* F�ORO S" AMENDMENT C, r OF SUN PNO AMENDMENT NUMBER: #2 DATE: 10/15/15 PROJECT: 174th St Roadway BID NUMBER: 14-11-01 Improvement RESOLUTION NUMBER: 2015-2401 ORIGINAL DOLLAR CONTRACT AMOUNT: $2,965,750.20 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $74,470.22 DOLLAR AMOUNT OF THIS CHANGE ORDER: $208,537.14 CREDIT/DIRECT PURCHASES: $0 NEW DOLLAR CONTRACT AMOUNT: $3,174,287:34 ORIGINAL CONTACT COMPLETION DATE 03.30.16 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 12 AMOUNT OF DAYS PER THIS CHANGE ORDER: 24 NEW CONTRACT COMPLETION DATE: 05.05.16 DESCRIPTION OF SCOPE OR WORK CHANGES: Demolish and reconstruct existing curb and sidewalk on both sides of 174th St, west of N. Bay Road. See attached proposal NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the issues set forth in this document. Florida Engineering & CONTRACTOR: Development Corp. CITY ATTORNEY: Hans Ottinot /4,611 CAPITAL PROJECTS MANAGER: ii Elka Linton-Dorsett � •� CITY MANAGER: Christopher J. Russo r// 12076 NW 98 AVENUE ��FLORIDA ENGINEERING Hialeah Gardens FL 33018 (305)820 8333 &DEVELOPMENT CORP. sns»MC SUBCONTRACT CHANGE ORDER Project: N.E.174th Street ROADWAY IMPROVEMENTS Subcontract: Change Order: 2 Date: 9/14/2015 Cost Code: To: CITY of SUNNY ISLES BEACH The Contract Is changed as follows: Item Description Amount 1 Demolition and Reconstruction of Sidewalk and Curb in Side West of Project $208,537.14 The Original Contract Amount was $ 2,965,750.20 Net change by previously authorized Change Orders $208,537.14 The Contract Amount prior this Change Order was $ 2,965,750.20 The Contract will be decreased by this Change Order in the amount of The new Contract Amount including this Change Order will be $ 3,174,287.34 The Contract Time will be change in 24 calendar days The date of Substantial Competition as of the date of this Change Order therefore is City of Sunny Isles Florida Engineering Owner CONTRACTOR s' 2 ta/L 1114.,:e (Signature) (Signature) • • C %STOPik .J (USSO Omar Medina By 0..1 pANtas.ok By 9/14/2015 Date Date Exhibit "A" Florida Engineering&Development Corp 12076 NW 98th Ave. �7 Hialeah Gardens FL 33018 'FLORIDA ENGINEERING &DEVELOPMENT CORP. Project:NE 174th Street Roadway Improvements Scope of work:Sidewalk Reconstruction West side of the intersection of 174th and NBR Location: NE 174th Street Date: 9/14/2015 PROPOSED CHANGE ORDER No. 2 Sidewalk and Curbs TABLE OF QUANTITIES No. Item Qty Unit Unit Price Total A) Mobilization and Demobilization(Item 1 contract) 1 Project Manager 24 Hrs $ 70.00 S 1,680.00 2 Project Superintendent 136 Hrs S 60.00 5 8,160.00 3 Equipment Transportation 2 Ea $ 400.00 S 800.00 4 Truck Superintendent 17 Day $ 57.50 $ 977.50 Sub-Total S 11,617.50 B) MOT(item 2 Contract) 5 Laborer(2)Set up Maintenance 36 Hrs $ 28.98 $ 1,043.28 6 Police Officer 136 Hrs $ 60.00 S 8,160.00 7 Barricades/Signs 17 Day S 355.00 $ 6,035.00 Sub-Total $ 15,238.28 C) SPPP&NPDES•Dust Control(Item 7 Contract) Equipment 8 Water Truck With Driver 30 Hrs $ 103.95 $ 3,118.50 Sub-Total $ 3,118.50 0) Demolition(sidewalk;F-curb) Labor 9 Foreman 40 Hrs $ 54.34 $ 2,173.60 10 Operator(1) 40 Hrs $ 42.26 $ 1,690.40 11 Laborer(2) 80 Hrs $ 28.98 $ 2,318.40 Equipment 12 Backhoe 40 His S 105.00 $ 4.200.00 13 Truck(hauling) 30 Load $ 137.50 S 4,125.00 Sub-Total S 14,507.40 E) Adjust covers for existing utilities(Item 70) 14 Reset Existing Valve Est(9+97.00N,11+46.00S. 14+92.00N,16+52.00N,17+0.00N, 18+5.00N,18+62.00S 7 Ea $ 263.25 $ 1,842.75 15 Adjust Existing Manhole(Est 19+42.00) 1 Ea S 435.50 $ 435.50 Sub-Total $ 2,278.25 F) Subcontractor 16 Testing-subcontractor 1 Ls $ 1,735.65 17 Survey and As-Built 1 Ls $ 4,327.67 Sub-Total $ 6,063.32 Sub-total $ 52,823.25 15%Overhead,Profit S 7,923.49 Subtotal PCO#2 $ 60,746.74 "f - Florida Engineering&Development Carp 12076 NW 98th Ave. Hialeah Gardens Fl.33018 :.'FLORIDA ENGINEERING &DEVELOPMENT CORP. Project:NE 174th Street Roadway Improvements Y'` Scope of work:Sidewalk Reconstruction West side of the intersection of 174th and NBR Location: NE 174th Street Date: 9/14/2015 PROPOSED CHANGE ORDER No. 2 Sidewalk and Curbs TABLE OF QUANTITIES No. Item Qty Unit Unit Price Total G) Items(Price As Per Contract) 18 6"Limerock Base(1 ft strip) 228 SY $ 7.80 $ 1,778.40 19 FDOT Curb F (Contract Item 37) 1845 Lf $ 17.20 $ 31,734.00 20 Modified Curb F(Contract Item 40) 1750 Lf S 18.00 $ 31,500.00 21 2'Valley-Gutter (Contract Item 41) 195 Lf $ 16.70 $ 3,256.50 22 5'Wide 6"Thick Concrete sidewalk 3000 psi Including H/C 1140 Sy $ 47.50 $ 54,150.00 Sidewalks ramp as per plans(Contract Item 42) 23 Detectable Warning Surface(Contract Item 44) 48 Ea $ 340.00 $ 16,320.00 3"Type SP-9.5 Asphalt(2 equal Lifts)for Reconstructed 24 Road(Contract Item 33)one(1)feet width trench 421 SY $ 21.50 $ 9,051.50 restoration Subtotal S 147,790.40 TOTAL PCO#2 $ 208,537.14 Ol'12Cc�L 711.4c:t Omar Medina Florida Engineering • F 0"NY/54 Fs O 'a B =`4'--3i CITY OF CONTRACT v tom';•t � _ SUNNY ISLES BEACH AMENDMENT oP yE 9'r FLOC° S0 C,Tr of SUN PNO AMENDMENT NUMBER: #3 DATE: 10/15/15 PROJECT: 174th St Roadway BID NUMBER: 14-11-01 Improvement RESOLUTION NUMBER: 2015-2401 ORIGINAL DOLLAR CONTRACT AMOUNT: $2,965,750.20 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $283,007.36 DOLLAR AMOUNT OF THIS CHANGE ORDER: $158,491.41 CREDIT /DIRECT PURCHASES: $0 NEW DOLLAR CONTRACT AMOUNT: $3,332,778.75 ORIGINAL CONTACT COMPLETION DATE 03.30.16 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 36 AMOUNT OF DAYS PER THIS CHANGE ORDER: 14 NTE NEW CONTRACT COMPLETION DATE: 05.19.16 DESCRIPTION OF SCOPE OR WORK CHANGES: Remove and replace up to seven (7) existing City of North Miami Beach owned water service lines. The attached CO #3 is for a single service line. It is possible that up to 7 service lines need to be replaced. The maximum not to exceed amount is $158,494.41 NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and dela relatin• to the issues set forth in this document. Florida Engineering & CONTRACTOR: Development Corp irirCITY ATTORNEY: Hans Ottinot rA CAPITAL PROJECTS MANAGER: '%%/�. Elka Linton-Dorsett A� CITY MANAGER: Christopher J. Russo 12076 NW 98 AVENUE Hialeah Gardens FL 33018 'FLORIDA ENGINEERING (305)820 8333 &DEVELOPMENT CORP. ENGPEE(CNO CONTRACTOR L C 1511029 E95901 SUBCONTRACT CHANGE ORDER Project: N.E.174th Street ROADWAY IMPROVEMENTS Subcontract: Change Order: 3 Date: 9/15/2015 Cost Code: To: CITY of SUNNY ISLES BEACH The Contract is changed as follows: - Item Description Amount 1 Restoration 6"water services change from Asbestos to DIP $22,641.63 The Original Contract Amount was $ 2,965,750.20 Net change by previously authorized Change Orders $22,641.63 The Contract Amount prior this Change Order was $ 2,965,750.20 The Contract will be decreased by this Change Order in the amount of The new Contract Amount including this Change Order will be $ 2,988,391.83 The Contract Time will be change in: 2 days The date of Substantial Competition as of the date of this Change Order therefore is City of Sunny Isles Florida Engineering Owner CONTRACTOR (Signature) [� (Signature) CikSTo R�SSb Omar Medina BY C.\r 4' (IVMMP/VO "�) By Date Date 9/15/2015 Exhibit "B" • Florida Engineering&Development Corp 12076 NW 98th Ave. Hialeah Gardens Fl.33018 FLORIDA ENGINEERING_ &DEVELOPMENT CORP. Project:NE 174th Street Roadway Improvements «��s Scope of work:New 6"DIP Crossing at NE 174 Street.(each) Exclusions:This proposal do not include any removal of Asbestos Pipes. Location: NE 174th Street Date:9/15/2015 Note: This job will be done at night and need to shut down the travel lanes. PROPOSED CHANGE ORDER No. 3 New 6"Water Services DIP(each) A) 6"Water Services DIP I No. I Item I Qty I Unit j Unit Price I Total I Laborer 1 Foreman 16 Hrs S 54.34 $ 869.44 2 Operator Mini Excavator 16 Hrs S 42.26 $ 676.16 3 Operator Loader 16 Hrs $ 42.26 $ 676.16 4 Pipelayer 16 Hrs $ 33.81 $ 540.96 5 Laborer 16 Hrs $ 28.98 $ 463.68 Subtotal Labor $ 3,226.40 Equipment 6 Mini Excavator 16 Hrs S 40.00 $ 640.00 7 Loader 16 Hrs $ 85.00 $ 1,360.00 8 Plate Compactor • 16 Hrs S 25.00 $ 400.00 Subtotal Equipment $ 2,400.00 Material 9 12X6 Tapping Sleeve 1 Ea $ 2,725.55 $ 2,725.55 10 6 CL 350 CI DI PIPE 80 Lf S 33.78 $ 2,702.40 11 6 MJ C153 45 Bend 4 Ea $ 97.02 $ 388.08 12 6 DI WDG REST ONELOK W/A 8 Ea $ 64.33 $ 514.64 13 6 Cap 1 Ea $ 97.53 $ 97.53 14 Poliwrap 1 Ea 5 350.00 S 350.00 15 Road Plate 2 Ea S 107.00 $ 214.00 16 Trench Restoration Street&Sidewalk(Asphalt Temporary) 25 Sy $ 21.60 $ 540.00 17 Dewatering Sistem 2 Day S 620.00 $ 1,240.00 Subtotal Material $ 8,772.20 Subcontractor 18 Mot 1 Ls $ 925.11 $ 925.11 • 19 Police Officer 16 Hrs $ 60.00 $ 960.00 20 Tapping into the existing line 1 Ea. $ 735.50 $ 735.50 21 Flushing&Chlorination 1 Ls $ 467.16 $ 467.16 22 Bacteriological Test 1 Ea. $ 154.00 $ 154.00 23 Overtime North Miami Beach Inspector Plus$50 Adm fee 16 Hrs $ 80.00 $ 1,280.00 24 Extended Hours Fee of Sunny Isles 16 Hrs $ 48.00 $ 768.00 Subtotal Subcontractor $ 5,289.77 Sub-total PCO#3 $ 19,688.37 15%Overhead,Profit S 2,953.26 Oh , ///0- Sub-total PCO#3 S 22,641.63■ Omar Medina Florida Engineering 10/9/2015 Item Coversheet " Y' City of Sunny Isles Beach ok '%7, 18070 Collins Avenue t V — :. Sunny Isles Beach,Florida 33160 S:., sloa;1:01s (305)947-0606 City Hall °,r,..0: °s.,µ,?° (305)949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Elka Linton-Dorsett, Capital Projects Manager DATE: 10/15/2015 Approving Change Order No. 2 with Florida Engineering and Development Corp.for Professional Construction RE: Services for the 174th Street Roadway Improvement Project and Change Order No. 3 to Remove and Replace up to Seven (7) Existing Water Service Lines RECOMMENDATION: Staff recommends approval of this resolution. REASONS: Resolution No. 2015-2401 approved the award of ITB No. 14-11-01 to Florida Engineering and Development Corporation to provide professional construction services for the construction of the 174th Street Roadway Improvement project. The general scope of services included drainage enhancements, complete sidewalk and roadway reconstruction from North Bay Road east, to Collins. Improvements west of North Bay Road were limited to milling and resurfacing the existing pavement surface, and minimal sidewalk repair. New landscaping and irrigation will be installed along the full length of 174th street. The $2,965,750.20 contract award included a project contingency amount of$268,418.14. In September 2015, Change Order No. 1 was executed to apply $74,039.05 of the project contingency towards the installation of IT conduit within the project limits for future use by the City. Changer Order No. 2 will increase the project scope and fee to include demolition and replacement of all the existing curb and sidewalk west of North Bay Road, thereby enhancing the aesthetics and ADA compliance of this existing sidewalk. The total amount for Change Order No. 2 is in an amount not to exceed $208,537.14 for a total contract value of$3,174,287.34. Furthermore, during the on-going construction activities, it was determined that some of the existing North Miami Beach owned water service lines connected to the Winston Towers residences are in poor condition. In partnership with the City of North Miami Beach, existing services lines within the 174th street corridor will be repaired, as deemed necessary by the City North Miami Beach. Changer Order No. 3 includes those additional services necessary for Florida Engineering and Development Corporation to remove and replace up to seven (7) existing water service lines. The amount for each water service line is $22,641.63. Therefore, the total amount for Changer http://sunnyi sles.novusagenda.com/agendaweb/CoverSheet.aspx?Item ID=1758 1/2 10/9/2015 Item Coversheet Order No. 3 is in an amount not to exceed $158,491.41. ADDITIONAL INFORMATION: This resolution is a companion item to the resolution approving an Interlocal agreement between the City of Sunny Isles Beach and the City of North Miami Beach for the replacement of existing water service lines. FUNDING SOURCE: Funding has been appropriated in account No 300-5-5410-465000- 84001. ATTACHMENTS: Description Resolution Change Orders 2 and 3 Item Number: 10.L. httpi/sunnyisles.novusagenda.com/agendaweb/CoverSheet.aspx?Item ID=1758 2/2