HomeMy WebLinkAboutSection 00801 - Local Requirements 00801 - 1/1 SECTION 00801 - LOCAL REQUIREMENTS PART 1 -- GENERAL These local requirements make additions to the Contract Documents which are required by state and local regulations. A. Public Entity Crimes: Pursuant to the requirements of Section 287.133, Florida Statues, pertaining to the sworn statement on Public Entity Crimes and the Convicted Vendor List, all Bidders shall submit a signed and notarized statement with their Bid on the form provided in Section 00300, "Sworn Statement Pursuant to Section 287.133(3)(a), FLORIDA STATUTES on Public Entity Crimes." B. Florida Trench Safety Act: The Bidders attention is directed to the enactment of the Florida Trench Safety Act, which incorporates OSHA Standards 29 CFR 1926.650, Subpart P, as the state's trench excavation safety standards. The Bidder shall list separately on the form provided in Section 00300 - Trench Safety Act Compliance Statement the cost of compliance with these standards. The Bidder shall determine if special shoring requirements are needed. Special shoring shall be identified and included in the cost quoted in the "Trench Safety Act Compliance Statement". The successful Bidder is fully responsible for the design of the trench safety system and the compliance with the applicable standards for the Project. C. Anti-Kickback Affidavit: All Bidders shall submit a signed and notarized Affidavit with their Bid on the form provided in Section 00300, "Anti-Kickback Affidavit". D. Indemnification: Pursuant to Section 725.06 of the Florida Statutes, the CONTRACTOR hereby acknowledges receipt and the adequacy of the specific consideration in the amount of one hundred ($100) which sum is included in the Total Bid Price, as payment from the OWNER to the CONTRACTOR for the indemnification given by the CONTRACTOR to the OWNER and ENGINEER under Section 00700, "General Conditions", Paragraph 6.13. E. Time is of the Essence for This Contract: Should the Contractor fail to complete the Contract by the contract completion date, as amended by any approved Change Orders, the Contractor will be subject to the liquidated damages as set forth elsewhere in this contract. In addition to the imposition of liquidated damages, the Owner will not process any partial payment request, nor make any partial payments to the contractor for such beyond the contract completion date (e.g., the only payment that will be made beyond the contract completion date will be a final payment once all the work has been completed and accepted by the owner). - END OF SECTION -