HomeMy WebLinkAboutSection 01010 Summary of Work 01010 - 1/3 SECTION 01010 - SUMMARY OF WORK PART 1 - GENERAL 1.01 SUMMARY: This section summarizes the Work of the Project as covered in detail in the complete Contract Documents. This is a general summary and is not intended to be complete and all inclusive of the required Work items. 1.02 PROJECT DESCRIPTION: A. Description of Project The work includes the CONTRACTOR furnishing all labor, materials, tools, equipment, incidentals and service necessary for the construction of approximately 12,000 linear feet of main conduit duct bank, numerous lateral conduit duct banks, street light conduit, street light concrete bases ,spare conduit for city of Sunny Isles, concrete pads for FPL transformers and Vista Switch Cabinets, Manholes, Hand holes, splitter boxes, and testing, surface overlay, traffic control, site restoration including sod, landscaping and driveway restoration to match existing conditions; and all other appurtenant and miscellaneous and incidental items and work for a complete, functional and satisfactory installation of the project as shown on the drawings. The duct banks contain conduit vary in sizes from 2 inch to 6-inch in diameter. The project involves work on Collins Avenue from NE 196th Street to Bayview Drive work off Collins Avenue including 191,185,178 and 175 Streets from Atlantic Boulevard to Collins Avenue; Atlantic Boulevard from 185 Street to 191 Street and 175 Street to 183 Street and the easement north of 175 street and south of 172 Street. All Work must be completed by March 31, 2017 B. The project is located in the street segments as shown on the Key Sheet of the Drawing Set,. Refer to the Contract Documents for the exact locations of the construction work. 1.03 RELATED CONTRACT ACTIVITIES: A. The Contractor shall comply with all Municipal, County, State and Federal laws, rules and regulations applicable to the work and the execution of the work. B. The Contractor shall review the existing permits for this project and secure all necessary additional permits for the execution of the work, including but not limited to permits from the City of Sunny Isles Beach and FDOT. C. The Contractor shall employ and pay for a Land Surveyor registered in the State Of Florida to establish all elevations, lines and levels. D. The Contractor shall be responsible for prompt notification to the Owner and timely field repairs in the event that the Contractor damages any of the Owner’s existing properties or overhead/ underground utilities. E. The Contractor shall be responsible for obtaining the necessary storage/staging areas for materials and equipment. The Contractor shall coordinate deliveries in accordance with the construction schedule and these specifications, so that materials do not pose an unnecessary long-term nuisance to motorists or residents. Excavated materials and/or backfill materials shall not be stored in the roadway right- of-way for more than 24 hours. If suitable for backfill elsewhere, excavated material must be stockpiled within the staging area. Materials unsuitable for backfill must be removed and disposed off immediately. 01010 - 2/3 1. Wherever possible, open trenches must be backfilled/plated, and barricades removed while maintaining adequate safety measures. 2. Streets must be graded/leveled to provide reasonable assurance against personal injury, vehicle damage, etc. 3. Streets temporarily restored, as described above, must be regularly maintained. For example, streets must be watered, new potholes filled and disturbed and adjacent paved streets swept. F. The Contractor shall employ and pay for the services of an independent testing laboratory to perform quality control services on work performed by the contractor. G. There is an available Geotechnical Investigation Report at the City of Sunny Isle Beach. 1. The above referenced report is no guarantee as to accuracy of completeness. 2. The Contractor is cautioned that this report has been utilized for general purposes only and may be inadequate for the purposes of bidding on the Contract items. 3. The availability of this report does not relieve the Contractor from his responsibility to familiarize itself with the subsurface conditions that may affect cost, progress and performance of work. 1.04 WORK PERFORMED BY OTHERS: A. The City of Sunny Isles Beach or other contractors may perform work on the existing water distribution system or public utilities as part of their maintenance and operations. The Contractor shall conduct its operations so as to cause a minimum of interference with the work of such other contractors and/or public utilities, and shall cooperate fully to provide continuous safe access to their respective portions of the site to perform their respective contracts. 1.05 CONTRACTOR'S USE OF PREMISES: See General Condition. 1.06 WORK SEQUENCE, COORDINATION ACTIVITIES AND SCHEDULED DATES: A. General: Work under this contract shall be scheduled and performed in such a manner as to result in the least possible disruption to driveway access. The CONTRACTOR will coordinate its work with other adjacent contractors, landowners, residents and City activities, with specific attention to access and staging areas. Construction sequence shall be determined by CONTRACTOR subject to the following needs for continuous access and operation by others. 1. The work will be performed in residential/commercial neighborhoods. The CONTRACTOR shall reasonable minimize the inconvenience to the residents and property owners, and reasonably maximize the safety of the residents: 2. construction activities shall take place in the evening in accordance with lane closure hours approved by the FDOT for the project MOT. All open trenches and excavations shall be closed or covered, and be in good driving condition with permanent asphalt, at the end of each work day. CONTRACTOR cannot proceed with the construction in more than one street at the same time, unless approved otherwise. 3. The work shall be conducted to maintain access to existing driveways at all times. 01010 - 3/3 B. Construction Schedule: The CONTRACTOR shall submit a proposed construction schedule, clearly showing the sequence of the work on a street-by-street and block by block basis to the City and the ENGINEER for their approval. Refer to Section 01310 Construction Schedules. 1.07 COPIES OF DOCUMENTS: See General Conditions. 1.08 CONTRACT DOCUMENTS: A. Contract Drawings: END OF SECTION