HomeMy WebLinkAboutSection 01200- Project Meetings and Reports 01200 - 1/3 SECTION 01200 PROJECT MEETINGS AND REPORTS: PART 1 - GENERAL 1.01 SUMMARY: This Section includes the following administrative and procedural requirements: A. Project Meetings: 1. Pre-construction conference. 2. Progress meetings. B. Schedules and Reports: 1. Initial coordination submittals. 2. Construction progress schedule. See SECTION 01310 Construction Schedule. 3. Special reports. 1.02 PROJECT MEETINGS: A. Pre-construction Conference 1. Engineer will administer a meeting within 10 days after the Effective Date of the Agreement, to review items stated in the following agenda and to establish a working understanding between the parties as to their relationships during conduct of the Work. 2. Preconstruction conference shall be attended by: a. Contractor and his superintendent. b. Representatives of principal Subcontractors and Suppliers. c. Engineer and his Resident Project Representative if any. d. City or his representative. e. Other affected parties determined by the City. 3. Agenda: a. Projected construction schedules. b. Critical Work sequencing. c. Designation of responsible personnel. d. Project coordination. e. Procedures and Processing of: i. Field decisions. ii. Substitutions. iii. Submittals. iv. Change Orders. v. Applications for payment. f. Procedures for testing. g. Procedures for maintaining record documents. h. Use of Premises: 01200 - 2/3 i. Office, work and storage areas. ii. City's requirements. i. Construction facilities, controls, and construction aids. j. Temporary utilities. k. Safety and first aid. l. Security. m. Requirements of any permits obtained by the City. 4. Location of Meeting: To be determined. B. Progress Meetings: 1. Engineer will administer a meeting bi-weekly. Contractor and Engineer shall be represented at each meeting. Contractor may request attendance by representatives of his Suppliers and other Subcontractors, or other entities concerned with current program or involved with planning, coordination or performance of future activities. All participants in the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work. 2. Contractor and each Subcontractor shall be prepared to discuss the current construction progress report, any anticipated future changes to the schedule, and advise if their current progress or future anticipated schedules are compatible with the Work. 3. Agenda. a. Review of construction progress since previous meeting. b. Field observations, interface requirements, conflicts. c. Problems which impede construction schedule. d. Off-site fabrication. e. Delivery schedules. f. Submittal schedules and status. g. Site utilization. h. Temporary facilities and services. i. Hours of Work. j. Hazards and risks. k. Housekeeping. l. Quality and Work standards. m. Change orders. n. Documentation of information for payment request. o. Corrective measures and procedures to regain projected schedule if necessary. p. Revisions to construction schedule. q. Progress and schedule during succeeding Work period. r. Review proposed changes for: 01200 - 3/3 i. Effect on construction schedule and on completion date. ii. Effect on other contracts of the Project. s. Other business. 4. Location of Meetings: To be determined. 5. Reporting: After each meeting, minutes of the meeting will be distributed to each party present and to parties who should have been present. C. Special Reports: 1. When an event of an unusual and significant nature occurs at the site, prepare and submit a special report. List the chain of events, persons participating, response by Contractor's personnel, an evaluation of the results or effects, and similar pertinent information. Advise the City in advance when such events are known or predictable. END OF SECTION