Loading...
HomeMy WebLinkAboutSection 01410- Testing and Quality Control 01410 - 1/3 SECTION 01410 TESTING AND QUALITY CONTROL PART 1 - GENERAL 1.01 CONTRACTOR QUALITY CONTROL: The Contractor shall provide and maintain an effective quality control program A. Establish a quality control system to perform sufficient inspection of all items of Work, including that of Subcontractors, to insure conformance to the Specifications and Drawings with respect to the materials, workmanship, construction, equipment performance, and identification. B. The Contractor's job supervisory staff may be used for quality control, supplemented as necessary by additional personnel for surveillance or special technicians to provide capability for the controls required by the Technical Specifications. The Contractor's quality control plan must clearly identify the quality control leader and personnel organizational system. The leader must have the authority to direct the removal and replacement of work. C. After the Contract is awarded and before construction begins, the Contractor shall meet with the City or its representative to discuss quality control requirements. The meeting shall develop mutual understanding relative to details of the system, including the Contractors forms to be used for recording the quality control operations, inspections, administration of the system, and the interrelationship of Contractor and City inspection. D. All compliance inspections shall be recorded on appropriate forms, including but not limited to the specific items required in each section of the Technical Specifications. Those forms, including record of corrective actions taken, shall be furnished to the City. The City's quality control representative shall maintain a check off list of all deficiencies which are not corrected the same day as they are discovered. E. Should recurring deficiencies in an item or items indicate that the quality control system is not adequate, the Contractor shall take such corrective actions as may be directed by the City. F. Contractor shall submit his written quality control plan for review, describing the activities and listing those inspections and testing activities that the Contractor will perform prior to beginning the Work. The Contractors Quality Control Plan shall describe how he will communicate timely notification to allow for test and inspection activities performed by the City, or its representatives, for on and off-site construction activities. 1.02 TESTING LABORATORY SERVICES: All tests which require the services of a laboratory to determine compliance with the Contract Documents shall be performed by an independent commercial testing laboratory acceptable to City. The laboratory shall be staffed with experienced technicians, properly equipped, ACI certified, and fully qualified to perform the tests in accordance with the specified standards. 01410 - 2/3 1.03 SERVICES FURNISHED BY CONTRACTOR: A. Testing that the City will coordinate and pay for is described in Section 1.04 below. All other testing laboratory services in connection with tests (which are identified as the Contractor's responsibility in the Contract Documents) shall be performed and paid for by the Contractor, and a certified copy of the results will be furnished to the CITY within 5 days of the test. B. The Contractor is responsible for testing and inspection services required to achieve an effective quality control program, to assure that the work strictly complies with the contract requirements. Contractor shall therefore employ and pay for an independent testing laboratory to perform all off, but not limited to, the following services: 1. Density tests for excavation and backfill 2. Bituminous paving 3. Concrete The above tests shall be conducted in compliance with the FDOT Standard Specifications for Road and Bridge Construction. 4. Testing of piping. The piping shall be tested as specified in this document and indicated on the plans. C. The Contractor shall employ and pay for an independent Land Surveyor for construction layout and the preparation of As-Builts. D. Contractor shall furnish all sample materials and cooperate in the sampling and field testing activities, interrupting the Work when necessary. E. When sampling or testing activities are performed in the field by testing laboratory personnel, Contractor shall furnish personnel and facilities to assist in the activities. F. Testing Laboratory employed by the Contractor will not be authorized to: 1. Release, revoke, alter or enlarge on requirements of the Contract Documents. 2. Approve or accept any portion of the Work. 3. Perform any duties of the Contractor. 4. The Contractor shall provide 24 hours notice of any testing for which he may desire witnessing by the City. 1.04 SERVICES FURNISHED BY CITY: A. The City reserves the right to have City staff or an independent testing laboratory perform testing on items that are the Contractor’s responsibility to test, if the City has reason to believe that additional testing is warranted. If the test results do not meet the requirements, the City shall be reimbursed by the Contractor for these tests. B. Arrangements for delivery of samples and test specimens to the testing laboratory under this paragraph will be made by City. The testing laboratory shall perform all laboratory tests within a reasonable time consistent with the specified standards and shall furnish a written report of each test. C. Contractor shall furnish all sample materials and cooperate in the sampling and field testing activities, interrupting the Work when necessary. D. When sampling or testing activities are performed in the field by testing laboratory personnel, Contractor shall furnish personnel and facilities to assist in the activities. E. Testing Laboratory employed by the City will not be authorized to: 01410 - 3/3 1. Release, revoke, alter or enlarge on requirements of the Contract Documents. 2. Approve or accept any portion of the Work. 3. Perform any duties of the Contractor. 1.05 TRANSMITTAL OF TEST REPORTS: A. Written reports of test and engineering data furnished by Contractor shall be submitted as specified in SECTION 01300. B. Advanced copies of test results must be submitted for completed work with each application for payment. 1.06 MEASUREMENT AND PAYMENT: Laboratory testing, surveying and other quality control and compliance measures and procedures shall not be paid separately. Rather, the costs for such activities shall be part of the contractor’s unit costs of the items to which they pertain. END OF SECTION