HomeMy WebLinkAboutSection 01519- Temp Construction 01519 - 1/2 SECTION 01519 TEMPORARY CONSTRUCTION PART 1 - GENERAL 1.01 SCOPE: The Work specified in this Section consists of maintaining traffic within the limits of the project for the duration of the construction period. It shall include the construction and maintenance of the detour road as shown on the Drawings, furnishing, installing, and maintaining of traffic control and safety devices during construction, the control of dust, and any other special requirements for safe and expeditious movement of traffic as may be called for on the Drawings or as directed by the Engineer. 1.02 STANDARD REFERENCES: The following standard specifications shall apply to the work of this section as indicated: A. Florida Department of Transportation Standard Specifications for Road and Bridge Construction, latest edition, (FDOT). B. State of Florida, Manual of Traffic Control and Safe Practices for Street and Highway Construction, latest edition 1.03 TESTS: The Contractor shall perform all required density tests specified by the referenced sections below. PART 2 - PRODUCTS 2.01 EMBANKMENT MATERIALS: Embankment materials shall conform to SECTION 02220, Excavation and Backfill, of these Specifications. 2.02 LIMEROCK BASE: The roadway base shall conform to SECTION 02232, Limerock Base, of these Specifications. 2.03 ASPHALT CONCRETE PAVEMENT: The pavement of the detour road shall conform to SECTION 02513, Asphalt Concrete Pavement, of these Specifications. 2.04 TEMPORARY TRAFFIC MARKINGS: All temporary striping shall be white or yellow degradable reflective tape with non-metallic backing, pre-coated with a pressure sensitive adhesive, and conforming to the requirements of FDOT Standard Specification Section 102-3.2.5. PART 3 - EXECUTION 3.01 SITE PREPARATION: All site preparation shall conform to SECTION 02100, Site Preparation of these Specifications. 3.02 EMBANKMENT CONSTRUCTION: The embankments required for the detour roads shall be constructed to the lines and grades shown on the Drawings and conform to SECTION 02220, Excavation and Backfill, of these Specifications. The Contractor shall provide adequate drainage for all temporary construction as directed by the Engineer. 01519 - 2/2 3.03 ROADWAY BASE CONSTRUCTION: The base shall be constructed to the lines and grades shown on the Drawings and conform to SECTIONS 02232, Limerock Base. 3.04 ASPHALT CONCRETE PAVEMENT: All pavement for the detour roads shall be constructed as shown on the Drawings and conform to SECTION 02513, Asphalt Concrete Pavement, of these Specifications. 3.05 TEMPORARY TRAFFIC MARKINGS: Pavement markings shall conform to the requirements of FDOT Standard Specification Section 102-3.2.5. and the Manual of Traffic Control and Safe Practices for Street and Highway Construction. 3.06 MAINTENANCE OF TRAFFIC: All lanes that are being used for the maintenance of traffic shall be adequately maintained in accordance with FDOT Standard Specification Section 102-2.1 and 102-2.2. 3.07 TRAFFIC CONTROL: The Contractor shall provide, install, and maintain adequate traffic control devices, warning devices, and barriers in accordance with FDOT Standard Specification Section 102-3, Traffic Control, and applicable sections of the Manual of Traffic Control and Safe Practices for Street and Highway Construction. 3.08 REMOVAL: The roadway base, surface, and embankments shall be removed to the original grades and lines or those required on the Drawings. The asphalt pavement shall be disposed of off-site. All existing pavement, shoulders, drainage, and other appurtenances shall be restored to the condition prior to the start of construction. 3.09 SIGNAGE REMOVAL: If removing existing traffic signage along the roadways, the Contractor shall be responsible for providing temporary signage during construction. The temporary signage shall be visible to the motorized vehicles. Once construction is completed, the Contractor shall be responsible for relocating the existing signage in the same pre- construction location. 3.10 ROADWAY RESTORATION: Roadways damaged by the Contractor shall be restored to their original condition by the Contractor subject to approval of the Owner or Engineer. 3.11 TEMPORARY WALKS AND DRIVEWAYS: All temporary walks and driveways shall be removed by the Contractor prior to final acceptance and the ground returned to its original condition, unless otherwise required by the Contract Documents. END OF SECTION