HomeMy WebLinkAboutSection 01519- Temp Construction
01519 - 1/2
SECTION 01519 TEMPORARY CONSTRUCTION
PART 1 - GENERAL
1.01 SCOPE: The Work specified in this Section consists of maintaining traffic
within the limits of the project for the duration of the construction period. It
shall include the construction and maintenance of the detour road as
shown on the Drawings, furnishing, installing, and maintaining of traffic
control and safety devices during construction, the control of dust, and any
other special requirements for safe and expeditious movement of traffic as
may be called for on the Drawings or as directed by the Engineer.
1.02 STANDARD REFERENCES: The following standard specifications shall
apply to the work of this section as indicated:
A. Florida Department of Transportation Standard Specifications for Road and Bridge
Construction, latest edition, (FDOT).
B. State of Florida, Manual of Traffic Control and Safe Practices for Street and Highway
Construction, latest edition
1.03 TESTS: The Contractor shall perform all required density tests specified
by the referenced sections below.
PART 2 - PRODUCTS
2.01 EMBANKMENT MATERIALS: Embankment materials shall conform to
SECTION 02220, Excavation and Backfill, of these Specifications.
2.02 LIMEROCK BASE: The roadway base shall conform to SECTION 02232,
Limerock Base, of these Specifications.
2.03 ASPHALT CONCRETE PAVEMENT: The pavement of the detour road
shall conform to SECTION 02513, Asphalt Concrete Pavement, of these
Specifications.
2.04 TEMPORARY TRAFFIC MARKINGS: All temporary striping shall be white
or yellow degradable reflective tape with non-metallic backing, pre-coated
with a pressure sensitive adhesive, and conforming to the requirements of
FDOT Standard Specification Section 102-3.2.5.
PART 3 - EXECUTION
3.01 SITE PREPARATION: All site preparation shall conform to SECTION
02100, Site Preparation of these Specifications.
3.02 EMBANKMENT CONSTRUCTION: The embankments required for the
detour roads shall be constructed to the lines and grades shown on the
Drawings and conform to SECTION 02220, Excavation and Backfill, of
these Specifications. The Contractor shall provide adequate drainage for
all temporary construction as directed by the Engineer.
01519 - 2/2
3.03 ROADWAY BASE CONSTRUCTION: The base shall be constructed to
the lines and grades shown on the Drawings and conform to SECTIONS
02232, Limerock Base.
3.04 ASPHALT CONCRETE PAVEMENT: All pavement for the detour roads
shall be constructed as shown on the Drawings and conform to SECTION
02513, Asphalt Concrete Pavement, of these Specifications.
3.05 TEMPORARY TRAFFIC MARKINGS: Pavement markings shall conform
to the requirements of FDOT Standard Specification Section 102-3.2.5.
and the Manual of Traffic Control and Safe Practices for Street and
Highway Construction.
3.06 MAINTENANCE OF TRAFFIC: All lanes that are being used for the
maintenance of traffic shall be adequately maintained in accordance with
FDOT Standard Specification Section 102-2.1 and 102-2.2.
3.07 TRAFFIC CONTROL: The Contractor shall provide, install, and maintain
adequate traffic control devices, warning devices, and barriers in
accordance with FDOT Standard Specification Section 102-3, Traffic
Control, and applicable sections of the Manual of Traffic Control and Safe
Practices for Street and Highway Construction.
3.08 REMOVAL: The roadway base, surface, and embankments shall be
removed to the original grades and lines or those required on the
Drawings. The asphalt pavement shall be disposed of off-site. All existing
pavement, shoulders, drainage, and other appurtenances shall be restored
to the condition prior to the start of construction.
3.09 SIGNAGE REMOVAL: If removing existing traffic signage along the
roadways, the Contractor shall be responsible for providing temporary
signage during construction. The temporary signage shall be visible to the
motorized vehicles. Once construction is completed, the Contractor shall
be responsible for relocating the existing signage in the same pre-
construction location.
3.10 ROADWAY RESTORATION: Roadways damaged by the Contractor shall
be restored to their original condition by the Contractor subject to approval
of the Owner or Engineer.
3.11 TEMPORARY WALKS AND DRIVEWAYS: All temporary walks and
driveways shall be removed by the Contractor prior to final acceptance and
the ground returned to its original condition, unless otherwise required by
the Contract Documents.
END OF SECTION