Loading...
HomeMy WebLinkAboutSection 01710 Cleaning 01710 - 1/2 SECTION 01710 CLEANING PART 1 - GENERAL 1.01 DESCRIPTION A. Perform cleaning, during progress of Work, and at completion of Work, as required by General Conditions. 1.02 DISPOSAL REQUIREMENTS A. Conduct cleaning and disposal operations to comply with codes, ordinances, regulations, and anti-pollution laws. 1.03 GOOD “HOUSEKEEPING” PRACTICES A. Contractor shall maintain good housekeeping practices throughout the duration of the project. B. If the City is dissatisfied with the cleanliness of the site, a written notice to improve cleanliness with specific instructions for improvement may be issued. If the Contractor does not improve cleanliness to the satisfaction of the City, payment may be denied and a separate contractor may be hired to complete Dust Control and Clean-up operations. Denied payments and cost of independent contractor will be subtracted from the lump-sum amount for this pay item and from the retainage amount if necessary, through a change order. PART 2 - PRODUCTS 2.01 MATERIALS A. Use only those cleaning materials which do not create hazards to health or property and which do not damage surfaces. B. Use only those cleaning materials and methods recommended by manufacturer of surface material to be cleaned. C. Use cleaning materials only on surfaces recommended by cleaning material manufacturer. PART 3 - EXECUTION 3.01 DURING CONSTRUCTION A. Perform periodic cleaning to keep Work, site and adjacent properties free from accumulations of waste materials, rubbish and windblown debris, resulting from construction operations. B. Provide on-site containers for collection of waste materials, debris, and rubbish. 01710 - 2/2 C. Remove waste materials, debris, and rubbish from site daily and dispose of at legal disposal areas away from site. 3.02 DUST CONTROL A. Clean interior spaces before start of finish painting and continue cleaning on as- needed basis until painting is finished. B. Schedule operations so dust and other contaminants resulting from cleaning process do not fall on wet or newly-coated surfaces. C. Use periodic water spraying as required to minimize dust formation and keep dust generating areas wetted down. 3.03 FINAL CLEANING A. Employ skilled personnel for final cleaning. B. Broom clean exterior paved surfaces and rake clean other surfaces of grounds. C. Wash and shine glazing and mirrors. D. Polish glossy surfaces to clear shine. E. Ventilating Systems: 1 Clean permanent filters and replace disposable filters if units were operated during construction. 2 Clean ducts, blowers, and coils if units were operated without filters during construction. 3 Upon completion, provide two spare sets of filters to the OWNER. F. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, labels, and other foreign materials from sight-exposed interior and exterior surfaces. G. Before Final Completion, or OWNER occupancy, conduct inspection of sight- exposed interior and exterior surfaces, and all Work areas, to verify Work is clean. H. Remove paving materials and clean all castings, exiting and new after final paving is completed. I. Clean all drainage structures and drainage components which may have received construction runoff, debris, and contaminants during construction operations. J. Maintain cleaning until acceptance and occupation by the OWNER. END OF SECTION