Loading...
HomeMy WebLinkAboutSection 02100 Site Preparation 02100 - 1/2 SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 SCOPE: A. Summary of Work: The CONTRACTOR shall furnish all labor, materials, and equipment necessary for complete and proper site preparation within the areas shown on the Drawings and specified herein and observe permit conditions. 1.02 APPLICABLE PUBLICATIONS: A. Applicable Standards: 1. Florida Department of Transportation Standard Specifications for Road and Bridge Construction, latest edition (FDOT). 1.03 DEFINITIONS: (Not Used) 1.04 SUBMITTALS: (Not Used) 1.05 QUALIFICATIONS: (Not Used) 1.06 RESPONSIBILITIES: A. The CONTRACTOR shall make all excavations for piping and appurtenant structures in any material encountered to the depth and grades required, shall backfill such excavations and dispose of excess or unsuitable materials from excavation, and shall provide and place necessary borrow material to properly backfill excavations, all as indicated on the drawings, specified herein, or as directed by the ENGINEER. B. Excavation, dewatering, sheeting and bracing required shall be carried out so as to prevent any possibility of undermining or disturbing the foundations of any existing structure or work, and so that all work may be accomplished and inspected in the dry, except as directed by the ENGINEER. Aqueous construction may be performed only with prior approval of the ENGINEER. 1.07 CERTIFICATIONS AND TESTINGS: (Not Used) 1.08 INSPECTION COORDINATION: (Not Used) 1.09 WARRANTY: (Not Used) PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION 3.01 TRAFFIC CONTROL: The CONTRACTOR shall provide proper warning devices and barriers for protection of the public and workmen in accordance with FDOT Specification Section 102-3 Traffic Control and local regulations. 3.02 STANDARD CLEARING AND GRUBBING: Standard site clearing and grubbing, in accordance with FDOT Specification Section 110.2, shall be performed within the areas shown on the Drawings or otherwise noted in the above referenced specification. 02100 - 2/2 3.03 EROSION CONTROL: The CONTRACTOR shall prevent and control erosion and water pollution as per FDOT Specification Sections 104-1, 2, 3, 4, 6 and 7 and Florida Department of Environmental Protection (FDEP) regulations and permit conditions. 3.04 PROTECTION AND/OR RELOCATION OF EXISTING FACILITIES: Existing facilities such as storm drains, roadways, water lines, light poles, conduits, fences, utility and telephone lines, etc. are to be carefully protected from damage during all phases of the construction. The CONTRACTOR shall make all necessary arrangements with the owner of the facility and be responsible for all costs involved in the proper protection, relocation or other work that such owners deem necessary. See General Specification. 3.05 UNDERGROUND UTILITIES: The CONTRACTOR shall provide all necessary liaisons with other utilities (underground) by notification, 48 hours in advance, of any digging by telephoning the appropriate Utility Notification Center and local utilities. END OF SECTION