HomeMy WebLinkAboutSection 02513 Asphaltic Concr Paving 02513 - 1/3 SECTION 02513 ASPHALTIC CONCRETE PAVING PART 1 - GENERAL 1.01 SCOPE: A. Summary of Work: The CONTRACTOR shall furnish all labor, materials, and equipment for construction of an asphaltic concrete surface course of the thickness and to the lines and grades shown on the Drawings or as specified herein. 1.02 APPLICABLE PUBLICATION: A. Florida Department of Transportation Standard Specifications for Road and Bridge Construction, (FDOT). 1.03 DEFINITIONS: (Not Used) 1.04 SUBMITTALS: A. Submit all job mix formulas to be used in this project per SECTION 01300 to the ENGINEER for approval. B. Submit manufacturer’s/suppliers’ certificates of compliance with the Specifications for all materials proposed. 1.05 QUALIFICATIONS: (Not Used) 1.06 RESPONSIBILITIES: (Not Used) 1.07 CERTIFICATIONS AND TESTING: Material testing shall be performed as described in the FDOT Standard Specifications for Road and Bridge Construction. 1.08 INSPECTION COORDINATION: The CONTRACTOR shall provide access to the WORK for the ENGINEER as requested for inspection. The Contractor shall provide 48 hours notice of its intention to begin new WORK activities. 1.09 WARRANTY: (Not Used) PART 2 - PRODUCTS 2.01 PRIME COAT: The CONTRACTOR shall furnish prime coat conforming to FDOT Specification Section 300-2.1, 916. 2.02 TACK COAT: The CONTRACTOR shall furnish tack coat shall conforming to FDOT Specification Section 300-2.3 and 916. 2.03 ASPHALTIC CONCRETE: The CONTRACTOR shall furnish asphaltic concrete conforming to the applicable FDOT Specification Section 320, 330, and 334. Asphalt concrete mix to be used in this job shall conform to FDOT Section 334, and shall meet the specifications of Type SP-9.5. PART 3 - EXECUTION 3.01 APPLICATION OF PRIME AND TACK COATS: The CONTRACTOR shall apply the prime and tack coats in accordance with the following: 02513 - 2/3 A. Weather Limitations: Application shall be made when the air temperature in the shade is above 40 degrees F. B. Prime Coat: Application of the prime coat shall conform to FDOT Specification Section 300-7. The surface to be primed shall be clean, and moisture content of the base shall not exceed 90% of the optimum. The temperature of the prime material shall be between 100 degrees and 150 degrees F. The material shall be applied by means of a pressure distributor. The rate of application shall be not less than 0.10gal/sy, unless directed otherwise by ENGINEER. C. Tack Coat: Application of the tack coat shall conform to FDOT Specification Section 300-8. The tack coat shall be applied with a pressure distributor. The material shall be heated to a suitable temperature for proper application. The rate of application shall be between 0.02 and 0.10gal per square yard. The time of application shall be sufficiently in advance of laying of the bituminous surface course to permit drying, but shall not be applied so far in advance so as to lose adhesiveness. The surface shall be kept free from traffic until the subsequent layer of bituminous hot mix has been laid. 3.02 LAYING OF ASPHALTIC CONCRETE: The CONTRACTOR shall lay the asphaltic concrete pavement in conformance with the following: A. Limitations of Operations: The laying operations shall not begin unless the weather is suitable for all activities to be completed in dry conditions. B. Preparation: The preparation of the asphalt cement, aggregates and mixture shall conform to FDOT Specification Section 330-4, 5, and 6. C. Transportation: The mixture shall be transported as specified in FDOT Specification Section 330-7. D. Placing Mixture: Placing the mixture shall conform to FDOT Specification Section 330-9. Lift thickness shall be 1” thick after compaction or as shown on the drawings. E. Compacting Mixture: Compaction of the asphaltic concrete shall be in accordance with FDOT Specification Section 330-10. F. Surface Requirements: The surface shall conform to FDOT Specification Section 330-12. 3.03 PROTECTION OF FINISHED SURFACES: The CONTRACTOR shall protect the finished asphaltic concrete pavement surface upon completion. No dumping of any material directly on the pavement shall be permitted. Vehicular traffic shall not be permitted on any pavement that has not set sufficiently to prevent rutting or other distortion. 3.04 TEMPORARY PAVEMENT OVER TRENCHES: Temporary pavement over trenches shall be installed according to this section and the Detail Sheets in the Construction Documents. The temporary pavement shall meet the elevations of the existing pavement at the saw- cuts, and shall be uniform in thickness and shall conform to the slope of the original pavement. 3.05 FULL LANE WIDTH PAVEMENT OVERLAY: At all affected street lanes, and as indicated on the plans, will receive a full lane width pavement overlay. Connections to existing not resurfaced roads shall be provided with a saw cut and milling to a depth of 1” a 2 foot wide strip at all connections to existing pavement for the full roadway width perpendicular to the 02513 - 3/3 centerline of the roadway being resurfaced. Then the entire width, and as indicated in the plans, will receive a 1” thick pavement overlay which shall be installed per this section. END OF SECTION