HomeMy WebLinkAboutSection 02577 Pavement Marking
02577 - 1/3
SECTION 02577 PAVEMENT MARKING
PART 1 - GENERAL
1.01 SCOPE:
A. Summary of Work: This Section consists of reflective pavement markers, traffic
stripes and makings and traffic signs as specified herein, and as required for a
complete installation.
1.02 SUBMITTALS:
1.03 A. Contractor shall submit shop drawings and related information for materials to be
used for pavement markings to the ENGINEER for approval in accordance with Section
01300.
1.04 QUALITY CONTROL:
A. The phrase "DOT Specifications" shall refer to the Florida Department of
Transportation Standard Specifications for Road and Bridge Construction. The DOT
Specifications, are referred to herein and are hereby made a part of this Contract to
the extent of. such references, and shall be as binding upon the Contract as though
reproduced herein in their entirety.
1.05 CERTIFICATIONS:
A. The CONTRACTOR shall furnish the manufacturer's certification that all signs
furnished conform to these specifications and shall replace or repair at his/her
expense all signs that fail to meet this requirement.
1.06 INSPECTION COORDINATION: The CONTRACTOR shall provide access to the WORK
for the ENGINEER as requested for inspection. The Contractor shall provide 48 hours
notice of its intention to begin new WORK activities.
1.07 WARRANTY: (Not Used)
PART 2 - PRODUCTS
2.01 PAVEMENT MARKINGS
A. CONTRACTOR shall replace any existing reflective pavement markers damaged
during construction, and provide traffic stripes and markings as indicated on the
construction drawings and as required to comply with traffic marking standards.
B. Paint for traffic stripes and markings shall be in conformance with DOT specification
“Thermoplastic Traffic Stripes and Markings Paint" 711-12. The colors of the paint
shall be yellow or white as existed before the repair or as required for a complete
installation as described in the detail drawings and in the Manual on Uniform Traffic
Control Devices.
C. Reflective pavement markers (RPM) shall be in conformance with DOT specification
Section 706-2.
02577 - 2/3
2.02 TRAFFIC SIGNS
A. General: CONTRACTOR shall replace signs damaged during construction. Traffic
regulating signs shall conform to the colors, dimensions and requirements of the
Manual on uniform Traffic Control Devices (ANSI).
B. Sign Panels and Support Members: Sign panels and support members shall conform to
Aluminum Association Alloy 6061-T6.
C. Bolts: Bolts shall conform to Aluminum Association Alloy 2024-T4 with an anodic coating
0.0002-inches thick minimum and chromate sealed.
D. Nuts: Nuts shall conform to Aluminum Association Alloy 6269-T9.
E. Reflective Sheeting: Reflective sheeting shall conform to DOT Type A requirements.
F. Construction Warning Signs: The CONTRACTOR shall install traffic and warning signs
during construction in accordance with OSHA, DOT and County requirements.
PART 3 - EXECUTION
3.01 PAVEMENT MARKINGS
A. The surface which is to be painted shall be cleaned, by compressed air or other effective
means, immediately before the start of painting, and shall be clean and dry when the
paint is applied. Any vegetation or soil shall be removed from the pavement before edge
striping is begun.
B. The traffic stripe shall be of the specified width, with clean, true edges and without sharp
breaks in the alignment. A uniform coating of paint shall be obtained and the finished
stripe shall contain no light spots or paint skips. Any stripes which do not have a uniform,
satisfactory appearance, both day and night, shall be corrected.
C. All newly painted stripes, including edge stripes, shall be protected until the paint is
sufficiently dry to permit vehicles to cross the stripe without damage from the tires. While
the center line stripes are being painted, all traffic shall be routed away from the painting
operations and the newly painted stripe. When necessary, a pilot car shall be used to
protect the painting operations from traffic interference.
D. Any portions of the stripes damaged by passing traffic or from other causes shall be
repainted at the CONTRACTOR'S expense.
a. Thermoplastic Traffic Stripes and Markings: Thermoplastic pavement markings,
including stripes, pavement messages, stop bars, directional arrows, reflective
pavement markers and other miscellaneous items, will be replaced as existed
before the repair was made. The thermoplastic compound shall be as specified in
Section 711 of the D.O.T. Specifications. The thermoplastic compound shall be
extruded or sprayed onto the pavement surface in a molten state by mechanical
means, with surface application of glass spheres, when required, and upon
cooling to ambient pavement temperature shall produce an adherent pavement
02577 - 3/3
marking of specified thickness and width and capable of resisting deformation.
E. The portion of the pavement surface or thermoplastic marking to which the marker is
attached by the adhesive shall be cleaned of dirt, curing compound, grease, oil, moisture,
loose or unsound pavement and any other material which would adversely affect the
adhesive. Reflective markers shall be installed in such a manner that the reflective face
of the marker is perpendicular to a line parallel to the roadway centerline. No markers
shall be installed over longitudinal or transverse joints of the pavement surface. The
adhesive shall be spread on the bonding surface (not the marker) so that 100 percent of
the bonding area of the marker will be covered. The adhesive application shall be
sufficient thickness so that when the marker is pressed into the adhesive, excess
adhesive shall be forced out around the entire perimeter of the marker. All excessive
adhesive shall be removed from in front of the reflective faces, if any adhesive or foreign
matter adheres to the reflective face of the marker, the marker shall be replaced. The
ENGINEER shall determine the minimum time necessary to cure the adhesive for
sufficient set to bear traffic.
3.02 SIGN FABRICATION
A. Preparation of sign blanks and fabrication of reflectorized faces shall conform to the
applicable requirements of DOT Section 700-4 and 700-5.
3.03 INSTALLATION
A. Sign and supports shall be erected in conformance to DOT requirements and as
specified herein.
B. All damaged signs and reflective pavement markers and traffic stripes and markings
shall be replaced in conformance with this Section and DOT requirements.
3.04 WEATHER LIMITATIONS: The CONTRACTOR shall not apply paint when any moisture is
present on the surface to be painted or when the air temperature is below 40 degrees F.
Painting shall not be done when winds are sufficient to cause spray dust.
3.05 CORRECTED MEASURES: All painted stripes, which fail to meet the specifications
including the permissible tolerances and appearance requirements, or are marred or
damaged by traffic or from other causes, shall be corrected by the CONTRACTOR at its
sole expense. All drips and spattered paint shall be removed to the satisfaction of the
ENGINEER. Whenever it is necessary to remove paint, it shall be performed by sand
blasting or by any other means, which will not damage the underlying surface of the
pavement as approved by the ENGINEER.
END OF SECTION