SECTION 02932 SODDING
PART 1 - GENERAL
1.01 SCOPE OF WORK
A. Furnish all labor, materials, equipment and incidentals required to prepare lawn bed
and install sodding as required to restore damaged sodding.
B. Area to receive sodded grass lawns shall include all disturbed areas to the limits
shown on the drawings. Sodded areas shall extend to the pavement, sidewalk, or
property lines, whichever is greater.
1.02 SUBMITTALS
A. Provide technical data as provided in Section 01300 for shop drawings on all
materials or installation procedures required under this Section.
B. Submit representative topsoil samples for analysis by a private laboratory to
determine nutrient deficiencies and outline a proper fertilization program. Copies of
the test results shall be provided to the ENGINEER. Based on tests performed by
the CONTRACTOR, the soil conditioners shall be as specified or as recommended
by the ENGINEER.
C. Submit as provided in Section 01300 certifications required for all sodding supplied.
1.3 QUALITY ASSURANCE
A. Comply with all current restrictions in regard to movement of sod into or within areas
which are outside of quarantine boundaries for the white fringed beetle and the
imported fire ant, as issued by the following agencies:
1 U.S. Department of Agriculture, Animal and Plant Health Inspection Service.
2 Florida Department of Agriculture, Division of Plant Industry.
1.4 GUARANTEE
A. Furnish a guarantee of all sodding work for a period of 120 calendar days after the
date of satisfactory installation of the sod or until final acceptance by the OWNER,
whichever is later. Continue maintenance and watering of the sodded areas as
specified herein during this guarantee period which is also considered the
establishment period.
B. During the guarantee period, replace at no cost to the OWNER any sod required
under the Contract that dies, is not established or is defective. In case of any doubt
as to the condition and satisfactory establishment of the sod, the OWNER may allow
such sod to remain through another establishment (120 days) period at which time
the sod in question, if found to be dead, in an unhealthy or badly impaired condition,
must be replaced.
PART 2 - PRODUCTS
2.01 SOD
02932 - 2/3
A. Sod, except as noted on plans, shall be Paspalum notatum (Argentine Bahia Grass)
of firm texture having a compacted growth and good root development as approved.
Grass sod shall be viable, clean, free of noxious pests and capable of vigorous
growth and development. Where noted on plans, Stenotaphrum Secondatum (St.
Augustine Floratam) will be used.
B. Sod shall be certified to meet Florida State Plant Board specifications, absolutely true
to varietal type, and free from weeds or other objectionable vegetation, fungus,
insects and disease of any kind.
C. Before being cut and lifted the sod shall have been mowed 3 times with the final
mowing not more than a week before cutting into uniform dimensions.
2.02 SOIL CONDITIONERS
A. Fertilizer:
1. Fertilizer shall be a complete fertilizer, the elements of which are derived from
organic sources. Fertilizer shall be a standard product complying with State
and Federal fertilizer laws.
2. Percentages of nitrogen, phosphorus and potash shall be based on laboratory
tests on soils outlined in Paragraph 1.02B and approved by the ENGINEER.
For purpose of bidding, assume 6 percent nitrogen, 6 percent phosphorus and
6 percent potash by weight. At least 50 percent of the total nitrogen shall
contain no less than 3 percent water-insoluble nitrogen.
3. Fertilizer shall be delivered to the site, mixed as specified, in the original
unopened standard size bags showing weight, analysis and name of
MANUFACTURER. Containers shall bear the MANUFACTURER's guaranteed
statement of analysis, or a MANUFACTURER's certificate of compliance
covering analysis shall be furnished to the ENGINEER. Store fertilizer in a
weatherproof place and in such a manner that it will be kept dry and its
effectiveness will not be impaired.
B. Superphosphate shall be composed of finely ground phosphate rock as commonly
used for agricultural purposes containing not less than 20 percent available
phosphoric acid.
PART 3 - EXECUTION
3.01 LAWN BED PREPARATION
A. Areas to be sodded shall be cleared of all rough grass, weeds, and debris, and the
ground brought to an even grade as approved.
B. The soil shall then be thoroughly tilled to a minimum 8-inch depth.
C. Superphosphate at a rate for bidding purposes of 5 pounds per 1000 square foot and
complete fertilizer at a rate for bidding purposes of 16 pounds per 1,000 square foot
shall be evenly distributed over entire area and cross disced in to a depth of 4-6
inches.
D. The areas shall then be brought to proper grade, free of sticks, stones, roots, or
other foreign matter over 1-inch in diameter or dimension. The surface shall conform
to finish grade, less the thickness of sod, free of water retaining depressions, the soil
friable and of uniformly firm texture.
02932 - 3/3
3.02 SOD HANDLING AND INSTALLATION
A. During delivery, prior to planting, and during the planting of the lawn areas, the sod
panels shall at all times be protected from excessive drying and unnecessary
exposure of the roots to the sun. All sod shall be stacked during construction and
planting so as not to be damaged by sweating or excessive heat and moisture.
B. After completion of soil conditioning as specified above, sod panels shall be laid
tightly together so as to make a solid sodded lawn area. There shall be no overlap of
butts or sides. On mounds and other slopes, the long dimension of the sod shall be
laid parallel to the contour of the slope. Immediately following sod laying the lawn
areas shall be rolled with a lawn roller customarily used for such purposes, and then
thoroughly watered.
C. No sod which has been cut for more than 72 hours shall be used unless specifically
authorized by the ENGINEER after ENGINEER'S inspection. Any sod which is not
planted within 24 hours after cutting shall be stacked in an approved manner and
maintained properly moistened.
D. Bring the sod edge in a neat, clean manner to the edge of all paving and shrub
areas. Top dressing with approved, clean, weed free, sand may be required at no
additional cost to the OWNER if deemed necessary by the ENGINEER.
E. Sodding shall not be performed when weather and soil conditions are, in the
ENGINEER'S opinion, unsuitable for proper results.
F. Areas on which sod is to be placed shall contain sufficient moisture to prevent drying
out. CONTRACTOR shall keep sod moist to the full depth of the rooting zone for a
minimum of two (2) weeks after installation.
3.03 MAINTENANCE
A. The CONTRACTOR shall produce a dense, well established lawn. The
CONTRACTOR shall be responsible for the repair and resodding of all eroded or
bare spots until project acceptance. Repair sodding shall be accomplished as in the
original work except that fertilizing may be omitted.
B. Sufficient watering shall be done by the CONTRACTOR to maintain adequate
moisture for optimum development of the lawn areas. Sodded areas shall receive no
less than 1.5 inches of water per week.
3.04 REPAIRS TO LAWN AREAS DISTURBED BY CONTRACTOR'S OPERATIONS
A. Lawn areas planted under this Contract and lawn areas outside the designated areas
damaged by CONTRACTOR's operations shall be repaired at once by proper sod
bed preparation, fertilizing and resodding, in accordance with these specifications,
except that for lawn areas in existence at the time of construction shall be resodded
with the type of sod originally in existence.
END OF SECTION