HomeMy WebLinkAboutSection 16132 Precast ManholeSECTION 16132 PRECAST MANHOLES PART 1 GENERAL 1.01 RELATED DOCUMENTS A. All applicable provisions of Bidding and Contract Requirements including Division 1 - General Requirements, shall govern the work under this section. 1.02 WORK INCLUDED A. Provide all labor, materials, necessary equipment and services to complete the pre-cast manholes work," as indicated on the drawings, as specified herein or both, except as for items specifically indicated as "NIC ITEMS". 1.03 RELATED WORK A. Section 02200 - Earthwork. B. Section 15108 –Handhole and Boxes 1.04 SUBMITALS A. Submit shop drawings and product data in accordance with Section 1300. 1.05 DESCRIPTION A. Provide precast manholes include excavating and backfilling as necessary for a complete installation in accordance with drawings and specifications. 1.06 QUALITY ASSURANCE A. The work shall be performed in accordance with the drawings. Earthwork shall be in accordance with Section, EXCAVATING, TRENCHING AND BACKFILLING FOR UTILITIES in Division 2. 1.07 COORDINATION A. Prior to beginning trenching operations, exact locations and clearances for all pre-cast manholes shall be established. Adjust position of underground utilities or adjust runs as necessary for proper location and installation. PART 2 PRODUCTS 2.01 ACCEPTABLE MANUFACTURER, MATERIALS AND COMPONENTS A. Provide and install per-cast concrete manholes with covers as shown on the drawings. B. Manholes shall be as manufactured by the suppliers as shown on the construction drawings . C. Concrete 1. Plain and reinforced concrete used in structures, connections of pipes with structures and the support of structures of frames shall be 3,000 psi. D. Frames and Covers 1. All frames and covers shall be of fabricated steel units. Stiffeners used on covers shall transfer load directly to the frame. 2. All frames and covers shall be designed for H20 loading. PART 3 EXECUTION 3.01 Excavation for Manholes A. The Contractor shall do all excavation for manholes to the lines and grades or elevations, shown on the plans, or as directed by the Engineer. The excavation shall be of sufficient size to permit the placing of the full width and length of the manholes as shown. The elevations as shown on the plans, shall be considered as approximately only; and the Engineer may order, in writing, changes in dimensions or elevations necessary to secure a satisfactory foundation. B. Boulders, logs, or any other objectionable material encountered in excavation shall be removed. All rock or other hard foundation material shall be cleaned of all loose material and cut to a firm surface either level, stepped, or serrated, as directed by the Engineer. All seams or crevices shall be cleaned out and grouted. All loose and disintegrated rock and thin strata shall be removed. When concrete is to rest on a surface other than rock, special care shall be taken not to disturb the bottom of the excavation, and excavation to final grade shall not be made until just before the manhole is to be placed. C. The Contractor shall do all bracing, sheathing, or shoring necessary to implement and protect the excavation and the manhole as required for safety or conformance to governing laws. The cost of bracing, sheathing, or shoring shall be included in the unit price bid for the structure. D. Unless otherwise provided, bracing, sheathing, or shoring involved in the construction of this item shall be removed by the Contractor after the completion of the manhole. Removal shall be effected in a manner which will not disturb or mar finished masonry. The cost of removal shall be included in the unit price bid for the structure. E. After each excavation is completed, the Contractor shall notify the Engineer to that effect and the manhole shall be placed after the Engineer has approved the depth of the excavation and the character of the foundation material. 3.02 BACKFILLING A. After installation of manhole has been completed, that area around it shall be filled with approved material, in horizontal layers and compacted to the density required. The top of the fill shall meet the elevation shown on the plans or as directed by the Engineer. END OF SECTION