Loading...
HomeMy WebLinkAboutBermello Ajamil - Engineering • • • • CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING • SERVICES FIRM ONLY (CCNA) • • • RFQ NO. 12-04-02 • • • Engineering I • • •• NNY / S •• s •• O . ' • • 4:ti, • • S ,. _x I �. , ® . _ s _ •. - ♦- .-C 1yw • • 9 V• QP • FLS • • • • • • ORIGINAL • Submitted by oBermello Ajamil & Partners , Inc . May 4, 2012 0 • • • Architecture • Engineering • Planning Interior Design • - Construction Services • Bermello Ajamil S. Partners, Inc. Landscape Architecture • • May 1, 2012 RfC • tivtD • City of Sunny Isles Beach MAY 4 • City Clerk c�ryOF 2012 • S8nny sl• elslBeach, FL 33160 Avenue OFFIOEOFTHEcLE BEA y • fix • RE: RESPONSE TO REQUEST FOR QUALIFICATIONS - No. 12-04-02 - ENGINEERING • CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY (CCNA) • • To the Office of the City Clerk: • • Bermello Ajamil & Partners, Inc. (B&A) is pleased to submit this qualification proposal for • "PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES" as defined in RFQ No. 12-04-02. • • B&A can provide engineering services as required by the City of Sunny Isles Beach including • paving, grading, drainage, utility, design, planning and permitting. • • In our capacity as Engineering Consultants to other municipalities, we have had the opportunity • to design a multitude of engineering projects from very small sidewalk improvements to larger • parks and utility retrofits. We believe that with our previous experience on similar projects, B&A • brings both the historical knowledge and experience necessary to serve the City in whatever • projects it has moving forward. • • B&A will be available to the City of Sunny Isles Beach on an "on-call" basis, able to handle a • wide range of tasks simultaneously, each with a specific scope, budget and schedule. • • We look forward to being able to work with the City of Sunny Isles Beach in this capacity. • • Sincerel : sly • • %kb- oung, P.E. • Berme! . •- -' & Partners, Inc • Phone: 305.859.2050 E-mail: JYouna@bermelloajamil.com • • • • • • • • 2601 South Bayshore Drive•10 Floor.Miami Florida•33133•USA•Main 305 859 2050•Fax 305 860 3200 D www.bermelloajamil.com 1 • TABLE OF CONTENTS • • • • Pg. • • 1 Company Information 3 • • • 2 Qualifications 9 • • • 3 Staffing 43 • • • 4 Approach & Methodology 63 • • • 5 References 67 • • • 6 Contract Forms 73 • • • • • • • • • • • • • • • • • • • • • • • • • • Ea CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY(CCNA) O RFO No. 12-04-02 2 n • • • • • • • • • • • Z • • 0 • _ • ~ • Q • • • De • 0 • Li_ • Z I — • • >- • Z • Q • o_ • • 0 •• U •• • I I— • • • • • • • • • • COMPANY INFORMATION • • ® OVERVIEW "'� •y;. ; - ' 1 Whether working on roads, bridge, stormwater/drainage• systems or a litany of other engineering-related projects, I e B&A's Engineering Group brings with it the know-how, i j „c /Pt talent and experience to tackle any project, always with 4 [ �1 • - • budgetary and scheduling constraints foremost in mind. ^ �+ i 3> • • �1� w I.l" r � • B&A's reliable, quality engineering design services solve � tti .0 tom!, r fi• d today's challenges while remaining flexible enough to .'; ? v rttni `! ' • meet tomorrow's needs. Principles of value engineering, F 4 -� tl • quality control, expediency and efficiency are applied `_ a • to every project, regardless of size, and have produced , ,•-- • • results which consistently exceed the expectations of • our clients. We focus on providing clients with workable • creative solutions for planning and design. • • Our Engineering Group has completed designs as well as construction services on several major roadway, • recreational and municipal projects in the cities of Miami, North Miami Beach, Aventura, Doral, Coral • Gables, Miami Beach, Pompano Beach and Hallandale Beach. • • B&A has successfully provided similar services on a continuing services basis to many municipalities • throughout South Florida. With our depth of experience in a wide variety of projects, B&A is ready to • tackle any project assigned by the City of Sunny Isles Beoch. • • History • Bermello Ajamil P. Partners, Inc. (BSA) is a local A/E firm providing engineering, architecture. planning, • landscape architecture,interior design and construction services.We specialize in providing these services • to municipalities throughout Florida and we hold significant expertise in the planning and design of parks • and recreational facilities, government and municipal complexes and streetscapes. • B&A was originally founded in 1939 and incorporated in the City of Miami under its current name in 1992. • We maintain a professional staff of over 80 talented individuals in both our Miami and Fort Lauderdale • offices, that possess the necessary expertise to successfully execute and complete projects for the City of o O Sunny Isles Beach. Our licensed staff of Engineers,Architects and Landscape Architects provide the expertise, professionalism • and innovative approaches fundamental to the execution of successful design solutions.B&A is committed to clients from pre-design through completion ensuring dedication, continuity and satisfaction. • • B&A has won numerous awards and our projects have been rewarded by consistent commissions from • local, county and state agencies. B&A has been consistently recognized for its design excellence by the • Society of American Registered Architects,American Institute of Architects,American Planning Association, and Florida Institute of Consulting Engineers. B&A has enjoyed a place among the top businesses in South • Florida. In 2009, B&A was recognized as one of the Top 500 Design Firms and in 2008 we were awarded • the Firm of the Year Award by AIA Miami. • • • Ea CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFO No. 12-04-02 3 0 ) ) COMPANY INFORMATION 0 • Resources • Our partners and staff offer a depth and breadth of expertise based on years of experience, talent and • innovation. Applying state-of-the-art technologies to enhance both design and project management, • B&A is completely automated for design, programming,drawing documentation and production,project • management, scheduling, specification and construction administration. • • Quality Assurance • B&A is a service-oriented company. From project inception through completion, the Principal-in-Charge • and Project Manager lead each project, assuring accountability and continuity in communication, • management, and design. We work together with our clients to set realistic goals and plan efficient, • flexible work programs to meet project needs. • Experience with Municipalities • B&A has provided A/E services to many governmental agencies and municipalities throughout South • Florida. We have successfully worked with and completed projects for the following: ® Miami-Dude County City of North Bay Village City of North Pod' City of Sunny Isles Beach' City of Hialeah Gardens Miami-Dade Water&Sewer Dept. • City of Miami Beach City of Homestead' Port of Miami' • City of Doral' City of Boca Raton City of Cope Coral' • Village of Palmetto Bay' Broward County/Pod Everglades' City of Fort Myers' City of Coro!Gables City of Pompano Beach' City of Miramar • City of Hallandale Beach' City of Coconut Creek' City of Cape Coral • City of Aventura City of Hollywood City of St.Petersburg' • City of Miami' City of North Port Village of Wellington' ® City of Hialeah' City of Fort Lauderdale Rorida Dept.of Transportation Monroe County City of Pembroke Pines Broward County Port Everglades' • City of North Miami Beach' City of Coral Springs FL.Dept.of Management Services • City of Tamarac' City of West Palm Beach Miami-Dade County Public Works& • Town of Boy Harbor Islands Miami-Dade Expressway Authority' Dept. of Environmental Resources ® 'Continuing Services Contracts 0 COMPANY LOCATIONS ® Miami (Headquarters) Fort Lauderdale • 2601 South Bayshore Drive - 10th Floor 900 SE 3rd Avenue -Suite 203 • Miami, FL 33133 Fort Lauderdale, FL 33316 • Ph: 1.305.859.2050 Ph: 1.954.467.1113 • Fx: 1.305.859.9638 Fx: 1.954.467.1116 • • New York Southern California • 915 Broadway, Suite #708 3780 Kilroy Airport Way, Suite 200 • New York, New York 10010 Long Beach, California 90806 • Ph: 1.212.334.2050 Ph: 1.562.304.2854 • Fx: 1.212.334.4601/0453 Fx: 1.562.526.7001 • ® INTERNET WEB SITE ADDRESS: • www.bermelloajamil.com ® Cb CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY (CCNA) • RFO No. 12-04-02 4 a' • ) ) COMPANY INFORMATION • • • BUSINESS STRUCTURE • • • Willy A. Bermello, AIA, AICP Luis Ajamil, P.E. • Principal,Architecture Principal. Engineering Years w/Firm-36 Years w/Firm- 19 • • • ARCHITECTURE ENGINEERING PUBLIC INVOLVEMENT • Rai Fernandez, RA, LEED AP Dr.Carlos Bonzon,P.E. Tere Garcia • Partner.Managing Principal Director of Engineering Partner.Director Years w/Firm- 19 Years w/Firm-4 Years vv/Firm- 19 •• Bernard Horovitz,RA Frank Tejidor, P.E. Maria Trudeau-Rodriguez Partner.Education/Healthcare Years w/Firm-8 Senior Associate • Years w/Firm-20Arturo Moreno Years w/Firm- I I • Senior Associate ADMINISTRATIVE Saul Suarez, RA Years w/Firm- I I • Partner.Ports and Maritime Diana Garcia Years w/Finn- 18 Partner/CFO • CE&I Years w/Firm- 17 • Steve Pynes,RA Aurelio Matos, P.E. Daysi Bermello • Partner.Aviation Vice President,Director of CE81 Senior Associate,Office Administrator • Years w/Firm- 18 Years w/Firm- I Years w/Firm- 17 • James Rowe,RA Tony Hernandez,P.E. Angelica Camacho Partner Partner Human Resources Manager • Years w/Firm-b Years w/Firm- 11 Years w/Firm-8 • Jorge Ferrer Roberto King Nancy Lesassier Associate Senior Associate,Accounting Partner,Director of QA/OC Years w/Firrn-7 Years w/Firm- 17 • Years w/Firm- 18 • Deborah Russo • Scott Bakos PLANNING & LANDSCAPE Associate,controller Partner,Managing Principal ARCHITECTURE Years w/Firm-6 • Years w/Firm- 16 • Randy Hollingworth INFORMATION TECHNOLOGY Javier Cordova,RA,LEED AP Senior Associate.Director of Erick Bouza • Years w/Firm- 13 Landscape Architecture&PlanningAssociate 5 Lazaro Alvarez, RA Years w/F m-5 Years w/Firm-7 Years w/Firm- 11 A1lreda Sanchez ALR,AICP,LEED AP • Todd Osborn. RA,LEED AP Partner MARKETING B. BUSINESS • Years w/Firm- I Years w/Firm- 18 DEVELOPMENT • Raul Bejel,RA Rosemary Canals Senior Associate Felipe Alespeiti Business Development Manager • Years w/Firm-7 Partner Years w/Firm- 1 • Bayardo Sandoval Years w/Firm- 18 Years w/Firm- 11 Erica Sobelrnan • Raul Carreras Mark Itfel Marketing Manager • Years w/Finn-6 Partner.Vice President of Ports 8 Associate Sergio Paz Maritime Years vv/Firm-6 • Years w/Firm-9 Years w/Firrn- 11 • Freddy Vivas • Associate Years w/Firm-8 • • • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFO No. 12-04-02 5 SI ) COMPANY INFORMATION ) • • • LITIGATION STATEMENT • • Bermello Ajamil & Partners, Inc. (B&A) has had an exemplary record with excellent history and quality •• delivery of its services.Since its founding in 1939,the Firm has had few,if any,disputes with clients.However, • in the course of business, it is not uncommon for A/E firms to be involved in certain disputes, most of them • from third parties incidental to the course of business. • Currently, and specifically over the past 5 years, B&A has no major pending litigation, major disputes, • contract defaults or claims other than those listed below. Furthermore, B&A has not been terminated or • • has ever failed to complete any construction job in the past five years. • In the condominium arena it is almost certain that architects working on condominium will end up as a • party to litigation between the developer and the condominium association. Currently B&A is a party • to two such actions. B&A has resolved any issues associated with their services, but these actions stay • open until the developer settles the matter. In addition B&A is party to a suit where the client has sued • the contractor and all design consultants to resolve construction defects. B&A is working with the client • to resolve all matters. • • • • S S S • S S e • • • • • • S • S • • e • • • S • cba CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY(CCNA) RFO No. 12-04-02 6 COMPANY INFORMATION ,) • • • PROOF OF INSURANCE • • Client-it:31137 BERMEAJA ACORD-. " CERTIFICATE OF LIABILITY INSURANCE DATEADOMYYT • 11/10/2011 • THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES • BELOW.THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. ® IMPORTANT:If the certificate holder is en ADDITIONAL INSURED,the policybes)must be endorsed.If SUBROGATION IS WAIVED,subject to • the terms and conditions of the policy,certain policies may require an endorsement.A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsementls). • PRODUCERL2NT1CT NAPE: USI Insurance Services,LLC-CL °°o"E956 607-4000 ( �ru (A/c No,Ear.. uc.Nol: • 200 West Cypress Creek Rd#600 ADDRESS: • Fort Lauderdale,FL 33309 _ 954607-4000INSURERil1 AFFORDING COVERAGE ,LAIC• INSURER A:Hartford Casualty Insurance Com 29424 ® INSURED INSURER e:Hartford Fire Insurance Company 19682 Bermello,Ajamil&Partners,Inc. R c:Continental Casualty Company 20443 • 2601 South Bayshore Drive mating INSURER o-Hartford Ins Co of SE 38261 • Suite 1000 INSURER E: Miami,FL 33133 • INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: • THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS • CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PMD CLAIMS. • dER oot BR GOUCT EFF POLICY E.IP LTR TYPE OF INSURANCE INSt IIWD' POLICY NUMBER IYWDOtO Y)JMWDDYYY'OI LIMITS • A GENERALLATLRY 21UUNKK3709 11/111201111/11/2012 EACH OCCURRENCE :1000,000 XI COMMERCIAL GENERA LIABILITY I$REIW$`Fs F"E"TE®..°QI :300,000 • —17 CLAIMS-MADE I XI OCCUR I MED EAP(Any one paso1) :10,000 • I 1 PERSONAL 8ADV Iw ur :1,000,000 J GENERA AGGREGATE :2,000,000 • GENA AGGREGATE LIMIT APPLIES PER. PRODUCTS-COMP/OR AGO 62,000,000 POLICY I IP"a 1 • A (AUTOMOBILE LDBLmT I�La 21UUNKK3709 11/11/201111/11/2012°EDMe%«EosuNCLE 141.11T11,000,000 • LI Aar AUTO I BODILY INJURY(Ps Rem.) : • IIXI ALONED SCHEDULED I OOLY V:NnRT IPs as eI 1 ' • AUTOS AF"UTOSwvED I pPTY DAMAGE 1 • ll I I 1 A XI ONTRELLALAB I IOCCUR 21XHUKK3260 11111/201111/11/2012 EACHoccu+RENcE s5,000,000 • I EXCESS LAT I I CLAIMS-MADE( I AGGREGATE s5,000,000 • IDEO I XI RETENTION 510000 I s B WORKERS COMPENSATION 21WBZS6321 11/11/2011 11/11/2012 X IWCSTAwuS I IEan` • AND EMPLOYERS'LIABILITY ANY moPRIETORPARTNEREXECUTMEYI" IEC EAOI EACH ACCIDENT 51,000,000 OFFKERVEMBER EXCIUDEET n NIA • (a!YyysaaawpY In MTIEC.DISEASE-EA EMPLOYEE 51,000,000 CESCRIFTM'Of OPERATIONS cap. I EL DISEASE.POLICY LIMIT 51,000,000 • A Property 21UUNKK3709 11/11/2011 11/11/2012 Per Schedule on File • C Prof!Liability AEH288262231 11/11/2011 11/11/2012 S1M Each Claim/Agg. D Inland Marine 21MSFKO7033 11/11/2011 11111/2012 Per Schedule on File • DESCRIPTOR OF OPERATIONS I LOCATIONS I VEHICLES(Amu,ACORD 101,Assmonal Renick•YHM,Y,11 mon specs la roguing) ' • • • • • CERTIFICATE HOLDER CANCELLATION , • SPECIMEN SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN • ACCORDANCE WITH THE POLICY PROVISIONS. • AUTHOR/ZED REPRESENTATIVE • I (1147 • m 1988-2010 ACORD CORPORATION.All rights reserved. ACORD 25(2010/05) 1 of 1 The ACORD name and logo are registered marks of ACORD • 1/S6645068/M6644700 _ _ SRYZP • • • CbEi CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFO No. 12-04-02 7 at ) COMPANY INFORMATION • • • READY TO START • 0 B&A is committed to providing the City of Sunny Isles Beach with a Team of highly qualified professionals • including Engineers, Architects, Landscape Architects and Planners, . The B&A key staff assigned to this project will be available on a daily basis and will commit the time and professional expertise required to complete this exciting project on time and within budget. • Should our Team be awarded this contract, we are ready to begin work immediately! •• • • • • • • • • • • • • 0 0 • • • • • • • • • • • • • • • • • • • • • ® Cba CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY (CCNA) • RFO No. 12-04-02 8 s 0 • 0 • 0 • • • I • • • • • • • cn • Z • 0 • - • I- •Q 0U • • u- • _ • • Q • D •• a • • • • (N • I 0 • • • • • • • • • • • • A • QUALIFICATIONS ) • • • WHY ARE WE BEST QUALIFIED: • B&A has successfully worked with numerous municipalities throughout South Florida providing similar • Continuing Engineering Services including: • • City of Sunny Isles Beach - Architecture and Engineering .� let a • Miami-Dade Expressway Authority - General Engineering ig t:i • • ' li� • • City of North Miami - Civil Engineering & Urban Design/Planning i'41-. ...`-*) Lu. �•1 • Monroe County - General Engineering Services• rtes`4,--:,-• r_� x, •+«ty:f • • City of St. Petersburg - Engineering ealrPrWr ,'5- • • City of Cape Coral- Engineering ��- �rS:: •• • City of Fort Myers Engineering Services •' .J • City of Hallandale Beach - Architecture and Engineering .`• ': •• • City of Miami Beach - Architecture and Engineering y 4 ,c,„A l r, ti In �ei7'.-'•a- 1- :tire .,.,.:i+� ® • City of North Port - Architecture and Engineering _ __ _ _ • University of Miami - Architecture and Engineering - ` • '1. Z -.rr rvn Try.++ • • Florida International University - Architecture and Engineering „_. • Florida Atlantic University - Architecture and Engineering � � �' .''' • • City of Pompano Beach - Architecture and Engineering `�:',..4F - it- • • City of Tamarac - Architecture and Engineering --%+� R . - Lsi • • City of Hialeah - Architecture and Engineering - 1. --•-•,- � • City of Doral -Architecture and Engineering I r•: ,_ „��r _ • • Broward County Public Schools - Architecture and Engineering yyldf �'r •sem` o,' • r �. • Mercy Hospital - Architecture and Engineering 1 '+i` • • Jackson Memorial Hospital - Architecture and Engineering _ T. • • Miami Dade College - Architecture and Engineering i't-Ifiik • • City of Miami Beach - Construction Engineering & Inspections '�'.+ • • Key West-CEI for Sidewalk Projects .rr„ ' T1s++ • • Miami-Dade County Public Schools - Building Code Consultants �. -.,.,or 'Y+ ” - r-a • z _,.r • City of Coconut Creek- Architecture, Landscape Architecture - ==v^,:"=`'' • and Planning r" �'`• • • City of Homestead - A/E, Urban Design and PlanningNcl • • Village of Palmetto Bay- Professional Consulting Services Ar. f - • • City of Miami - Construction Engineering Observations -. • • City of Miami - Architecture - • • City of Coral Gables - Architecture Services !J'-•-40�1 /`,. - f'j��'' t�. .� #I • • City of Deerfield Beach - Consulting Services _ 4 -r%_;• a [A. • • Village of Wellington - Architecture ,r� = _ •� ' • • Port Everglades - General Consultants and Architect I• fp5;a4 -? /pry, • • Port of Miami - General Consultants _''3 +_f,`•' r 7t-'fb -i Imo-, LAi;5s_ t__ � : t. • •• Indian River Memorial Hospital - Architecture • ,I., • • North Broward Hospital District - Architecture Lt • • FDOT District 6 - Districtwide Miscellaneous Design Services .- _ • • FDOT District 6- Districtwide Public Involvement "• •r `' _ • • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFO No. 12-04-02 9 A ) QUALIFICATIONS .) • • • Sustainable Design - LEED• /E;, B , B&A is committed to developing sustainable and fully integrated designs while determining o !0 • realistic cost-saving opportunities. • ; t` n • As a member of the U.S.Green Building Council,B&A has established on early commitment \°u�;c • to the green building movement by creating a department dedicated to providing LEED • consulting services. Our LEED Accredited Professionals cover each stage of sustainable design and the • LEED Certification process. B&A has the knowledge and skills to successfully integrate sustainable design • and the LEED Certification process. • • B&A embraces the principals of energy efficiency and environmentally-responsible design and is • dedicated to providing our clients with healthy environments that increase energy efficiency and • decrease environmental impact. • • l_ • r . �7 , , •.•• • ,...__..-C I.Z it- liPirA ri --iggruMITCMIT mini ..aid if,'.„-t, � l�S�• �f aft 'AO s t. "r , • I _4_24. 1 La . • .. ' 1 I. 1 , ' l Ira' :3 1111 +S l • _ _ s C.va' cv ' = ®®®1�I tr. l • - 8> � • ".2,-..1 . job • _ u • I _i111 h mfr • 1111,111, Ail 1t� 1� 1-1 • • B&A's Broadway Pier Terminal at the Port of San Diego successfully underwent the LEED certification rating • process and the building has attained a Gold LEED Rating. B&A has registered other projects with the U.S. • Green Building Council for LEED certification. • • Awards • B&A has won numerous awards and our projects have been rewarded by consistent commissions from • local, county and state agencies. B&A has been consistently recognized for its design excellence by the • Society of American Registered Architects,American Institute of Architects,American Planning Association, • and Florida Institute of Consulting Engineers. B&A has enjoyed a place among the top businesses in South • Florida. In 2009, B&A was recognized as one of the Top 500 Design Firms and in 2008 we were awarded • the Firm of the Year Award by AIA Miami. • • • • • • cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFQ No. 12-04-02 10 Ilk QUALIFICATIONS • • Firm Awards • B&A has enjoyed a place among the top businesses in South Florida. The firm has received recognition • acknowledging its contribution to the community and profession. • 2009 ENR - The Top 500 Design Firms - No. 360 • 2008 AIA Miami - Firm of the Year Award • 2008 Hispanic Business Inc. - The Top 50 Hispanic-Owned Export Companies - No.19 • 2008 ENR -Top 200 International Design Firms - No. 190 and Top 500 Design Firms - No. 344 • 2007 Hispanic Business Inc. - The Top 500 Hispanic Owned Companies - No. 157 • 2007 ENR -Top 200 International Design Firms - No. 187 and Top 500 Design Firms - No. 354 • 2006 Architectural Record Magazine -The Top 150 Architecture Firms - No. 133 • 2006 Hispanic Business Inc. -The Top 500 Hispanic Owned Companies - No. 180 2004 Society of American Registered Architects - Firm of the Year Award • 2004 Hispanic Business Inc. -The Top 500 Hispanic Owned Companies - No. 190 • 2004 South Florida Business Journal - Largest Architectural Firms - No. 2 • 2004 South Florida Business Journal - Largest Engineering Firms - No. 4 • 2003 ENR - Top 500 Design Firms - No. 358 • 2002 ENR - The Top 500 Design Firms - No. 420 2001 Coral Gables Chamber of Commerce Diamond Award Business & Project Excellence Winner 2001 Greater Miami Chamber of Commerce - Top 100 Hispanic Businesses in Florida - No. 54 • 1998 ENR - Top 500 Design Firms - No. 375 111• 1998 Hispanic Business Inc. - The Top 500 Hispanic Owned Companies - No. 293 1997 Latin Builders Association - Architectural Firm of the Year • 1997 Hispanic Business Inc. - The Top 500 Hispanic Owned Companies - No. 180 • 1996 Hispanic Business Inc. - The Top 500 Hispanic Owned Companies- No. 274 • 1995 Hispanic Business Inc. - The Top 500 Hispanic Owned Companies- No. 28 • • Relevant Design Awards • NW 12th Avenue Bridge • 2009 Florida Transportation Builders Association, "Best in Construction Award" • • Aventura Community Center • 2008 Society of American Registered Architects - Professional Design Award • • City of Coral Gables Museum Garage 2008 Society of American Registered Architects - Professional Design Award • • MIC Interchange • 2008 Florida Transportation Builders Association, "Florida's Best in Construction" for a Major Interchange ® Bascule Bridge Replacement Project • 2004 Florida Dept. of Transportation & Florida Transportation Builders Association - Best in Construction ® Okeechobee Road - Road Widening and Bridge Rehabilitation Project 2004 Florida Dept. of Transportation & Florida Transportation Builders Association - Best in Construction • • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFQ No. 12-04-02 11 w ) QUALIFICATIONS 1 • • • Miami-Dade Expressway Authority Headquarters • 2003 Society of American Registered Architects - Design Award • • Miami-Dade Expressway System Wide Aesthetics Guidelines • 2003 Gold Coast Section American Planning Association - 2nd Place Outstanding Publication • • Margaret Pace Park • 2003 Society of American Registered Architects - Design Award • 2003 American Society of Landscape Architects - Florida Merit Design Award • 2003 Gold Coast Section American Planning Association - 2nd Place Outstanding Landscape Project • • Chicago Motorspeedway and Sportsman's Park Race Track • 2002 Florida Institute of Consulting Engineers- Grand Award Winner • • Homestead Motorsports Complex • 1996 American Society for Civil Engineering Miami-Dade Branch &South Florida Project of the Year • 1996 Florida Association of the American Institute of Architects -Award of Excellence in Architecture • 1996 Society of American Registered Architects, Award of Merit • 1996 Florida Institute for Consulting Engineers, Award of Honor • • . ,'f :'7.,.. .�.. ^` - • V • '-al".' rx �1 , ".;: �TCl::%.i_�O 'i'-" • _ .`!A_ • I 1 1 �. , .. ' • �1 L t — Z8- ?� i ti;rroa T 71 L. i �✓'Y�' ..F�_ 1TIC C4 H. • Lam- • ��� r • �/ P c\\ . , t I r •• ., . .. irey...i. {N. riiI ��' ' • • "'ice,, • I "'tit.? rIS \ ,itd h i a, • �..._ , tea,1 r JT'• � �.n , • I��.• -' ��- �. 4-A .a.m F-ti\ .I .„ • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY (CCNA) 0 RFO No. 12-04-02 12 • QUALIFICATIONS • ® LICENSES • 'tate rIT • • !curb 131. Bernell• i ners,• Inc. I,authorized under the provisions of •=Try; •• • Statutes,to offer engineering strrices • to the pubic through i Professional Engin 4.._1.1.1. @oder Chapter 471,Florida Statutes. • Certificate of Authorization • EXPIRATION:223/2013 CA.L.C.No: • AUDIT No: 228201304627 6304 • • • • cr- • • Are fffE n • Puarb of E saralial Titgineers • Luis,Ajamriil,P_.E.• • • IS 1JCENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471,FLORIDA STATUTES • EXPIRATION:2728/2013 P.E:Lic.NO: • Auorr No: 228201304564 18420 • • •• _ • Ari 'Q OxCedir • • !Darb ofsi t Engineers • Ned' • Jack P:4YoungiJr., P.E. • �oT.r6 • IS LICENSED AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471,FLORIDA STATUTES EUPIRATION:2/28/2013 P.E.LIC.NO: • AUDIT NO: 228201300131 45646 • • • • • • • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL 8, ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFO No. 12-04-02 13 QUALIFICATIONS • • LICENSES •• • IIf • ,�� Q JOT/ astle • V Paara of irrafrss n utl f nginerrs nog'? �} Yi. s:to. �. • Aurelio r:; P.E.• • IS LICENSED AS A PROFESSONAL ENGINEER UNDER CHAPTER 471,FLORIDA STATUTES • EZPIRATON:2/28/2013 . P.E.uc.No: • Auorr No: 228201308118 71701 • • t . x � 3 f • .. Yj.�" f M nS f r��t.. •.rp'^'�J. M�]'T`f ��_ r ' v ,• � -tr Qrbaf • I.� ^ $Ta + nguttrrB` -�I � D • 1 . rr�vAY T+ : .Yr I 1t -9--• ; j G �.* I zbn P.E. • -n • ;y IS LICENSED AS A PRO NAL ENGINEER UNDER CHAPTER 471 RI FLODA?TANTES 1{1{I {`EXARA170fe 2TI2013 '4'141; i .11. 'i - �PE18u742N0'-:1 • ...AUDrr'NO.t228201309818•`,... ; ,•, .4 • • • • • • • • • • • • • • • • • • • • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFQ No. 12-04-02 14 1 QUALIFICATIONS • • • CORPORATE CHARTER •• • • State of Florida • • Department of State • • • • I certify from the records of this office that BERMELLO, AJAMIL & • PARTNERS, INC. is a corporation organized under the laws of the State • of Florida, filed on February 28, 1977. • • The document number of this corporation is 528526. • • I further certify that said corporation has paid all fees due this office • through December 31, 2012, that its most recent annual report was filed • on January 4, 2012, and its status is active. • I further certify that said corporation has not filed Articles of • Dissolution. 0 00 0 0 0 0 0 • Given under my hand and the Great Seal of • Florida,at Tallahassee,the Capital, this the Fifth day of January, 2012 • • _c AVE • • C1t _ =' Secretary of State • ?In • Z:(•� • Authentication ID:100216144731-010512-528526 • "WE To authenticate this cenificate.risit the following site.enter this • ID.and then follow the instructions displayed. ® Imps://efile.sunbiz.orgicertauthver.html • • • • • Lba CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFQ No. 12-04-02 15 ) QUALIFICATIONS • • • • • • • • • • • • • • • • • • • • • • • RELEVANT EXPERIENCE • • • • • • • • • • • • • • • • • • • • • • • • E+^ CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • REQ No. 12-04-02 16 a • ! Qoa • Bermello Ajamil & Partners,Inc. ® \\ `� • ii,..c, \ ® ;o \ o ® ,= . 41. Qy`r ,. y l t,—� ``Y�� - tg4 1 Q.FI.- ® \\ _ U ��yy//�p..���� O / ,. / ` --� �' -"-t: • L.,_, _ ! -" .- / f ,{',, o �_�� 1 lei r m s y r �, �r•Tr-� r hl'R. / sV - r "+iz� ! ! r l i �_� fi•t' l =��' ® { , j�ill'`� I �� �t�t,�1•-i- fir...__`_ '�:�•••� � "' - / Lsr . a O Miami-Dade Expressway Authority Bermello Ajamil & Partners was the Program Manager for the ® Miami-Dade Expressway Authority, the agency That manages toll General Engineering Consultants • roads in Miami-Dade County. B&A was a part of developing and ® Miami, Florida implementing the 56 billion dollar Capital Development Program • Client: Miami-Dade Expressway Authority from its inception, taking charge of long-range planning, MPO S O Size: 16,000 SF approvals, community participation processes. environmental • Cost: $26 Million permitting and project procurement. e Completion: 2005 Projects included a 2-mile extension of State Road 836, the • planning for the Central Parkway connecting the Golden Glades • to Miami International Airport, the reconstruction of State Road ® 836. Miami's main east/west expressway. and the Interconnector, a 1-mile expressway connecting State Road 836 with State Road . 112 and MIA. B&A is also at the hear or one of the first high-speed 0 toll collection systems. • ® 17 • • • ICoa • Bermello Ajamil & Partners,Inc • O .`s ri.c s % a ` } fir * OD Zt • .r it -r-. ..,_ '� .Y... • `•� k' y st *J CO ~� ' T R`t!' ,' ;,;5,-;,,,27-- - '7 off if \,.' i ' �� i-7-,..-a.7"-.�.•.i�C a. ® dip�' i �_1/2,_ act % "r . -kr 'P A ,* i': `� � � ®i • � ,�, ter, ,�s 1 "�F y' ,l 0 `^ )/,,T 4 -' . !jy , .s C✓*Y"1�}- S • • at •'S,ri -, •• ^` . . r i • _ .�,Silt / ,rte. ]S ..-._ ., S. .. .5�......4 • • Aventura Community Center Bermello Ajamil & Partners, Inc. (B&A) prepared the master plan • 8 N.E. 188th Street for this 3.2-acre waterfront development for the City of Aventura O Aventura, Florida and provided architectural, landscape architectural end civil • engineering services for a 23.000 SF mixed-use recreational facility and related waterfront park. As Prime Consultants, • Client: City of Aventura B&A provided full reconstruction, design, permitting, project • Completion: 2003 manacement and construction administration services for '/2 Size: 23,000 SF • Cost: $6 Million mile of roadway from a 2- to a 4-lane divided roadway. • The Civil Engineering team designed new paving, grading, • drainage (ex-filtration trenches) with emergency outfall • streetscape, curb and clutter, sidewalks, landscaping, street O liohting, striping and signage. truck access management and new water services from NE 29th Avenue east to the inter- • coastal waterway. the project was kept under budget by • providing value engineered material alternatives during design • phase, and design and permitting was completed ahead of ® schedule. 0 18 0 0 k ' a Ilia • Bermello Ajamil & Partners, Inc. • • cI a1 • • _ " .".;17, 1) • c -_r' - ' . r ", 3 1 e�•/l1x • 3;•1.)01i rt` . • .• y��• \ • - l a - •__ 1/4c aural Perk cummui tneemet OI y= NOW OPEN NnoRAL mcros4at=- .zmromuu® 1J • iP > t e9 .11% . �i .: � > ir ,c•-.:-.:-.-:----;_,. cV 0 L. / •1 ,lt ,,,ip 'I pr . . • i -Ill O O ` a } • - - �:- - xt :-: %� 0 O Doral Park Bermello Ajamil & Partners. Inc. (B&A) was selected to provide ® Doral, Florida the design of this 14-acre neighborhood park situated in the City • of Doral. In designing the renovations, B&A hod to incorporate • Client:City of Doral both active and passive recreation facilities, working within the • Completion: 2007 confines of the existing site layout which included tennis courts, a Size: 14 Acres recreation building and a parking lot. • • The scope of work for the civil engineering component of this • project entailed providing coordination and design services as well as preparing construction documents for the median cut • along NW 102nd Avenue. the project consisted of providing • access to the redevelopment of Doral Park through a 4-lane • divided roadway and included the extension of a left turn lane, • closing an opening on the existing median and the provision of a new median cul for access to the park. The Civil Engineering • learn also led all permitting efforts associated with this project • with the relevant governing agencies. • 0 ,s • • 0 ! Coa • Bermello Ajamil & Partners,Inc. • • • �,.' t- „J` z., , I t Rte_ - ® �� - • _, rte`_ - L:f -�' • --•yr _ > - - - ..�. � cr s • , CC a- i •1 a.e r`z u _ 4: as+ • tee am —1__ • • -.4.1;" - ® Cf o L 14 1rd ! ® ' � f •ti• ti• .f✓` --.1.....,- !.� �i,M�c li Y.t i .�..[ � •y ay T^i. t • • '., r e. t. �Fq_ `c4„„''.r' r X�.).1.`7,.. y.,r,M'P . b 'K Pic x' P `. K�,)t K; �`,7' ��.740• _ .ter '1 t � a ,, p - ; ! ® -p_ [ 6 1,-- A il(]a'(A{ 1• . A. Yr. .'L.% -stmt Tat<tKJ k2fry 4� [.,a].;.,•(- g 4 V1-, e. gj� r LLL F •?jai ,-- d�• ® ( .]i� �.I : _'�....J Tom` ' �'•.{'-�. • tr O O Doral Meadows Park In conjunction with Recreational Design&Construction,Inc.(RDC), • Doral, Florida Corzo Costello Carbolic Thompson Salmon, PA and city officials, • Bermello Aiamil & Partners. Inc. provided the programming, • Client: City of Doral master planning, schematic design, design development and • Completion: 2005 construction documentation for this 14-acre regional urban park Size: 14 Acres within the City of Doral. • • Civil engineering services for this facility consisted of the design of • drainage improvements of 2 baseball fields by designing swales • along the perimeter of the Park. providing water connections • for a proposed water fountain and de-mucking the existing • baseball fields in order to comply with the geotechnical • recommendations. • O • 20 • Ilk • • • • C lia • • Bermello Ajamil & Partners,Inc. • • • `+C Illy 4 r r-"-iiih • �Lt. �'.at , f.v '�?•p`• � -/ t \ -'� ® < Sys�' rj►C , t\*• °3 6 ft: .-,-,t6,;(-1244 �x a _ l A We. . • rnrin Tn •$. c- 6 x 6 .ct s o , t -• - fn- in* A. .. • r.113...m...1 - � z '.1 t 4 — "j nib�1 Wk 1 • , 1J , i .p � Yro • sd¢ 2t4 s; ms, ® --;27--.W. . • D lot , e -,0 br4't' •i , Sa r � s•. Y a";471,43.-;:. 4 c t 4-'4:- I;34 �, , OWVi T Veit }.S 4 lY>fu Ra .fit ,SSV` 3jit • : ii (-----:-,---;':"/E., / '- "::: _ S f i • 4 q�.�, . + r tai: rr(� "f naci-::i'I�S :J_ r} s S -4 Q I _. r-- t> ? r'+ 4tr I P T _ • 'co • is -t, 1 N__A..'.r,,.._ �__. O t At x.s ti�111 tY1� '• _!Er^' 0 ® a r ri Y' liNkr; ' F • ' g • �.'. �I ic.•- ` j} r 1\ r r x11 fes ' r • ` ;e r `. `'v • _I �_ I a • � i • vo?,C'j o r �o1 z 1 �-r fta '� ai-1 - .ade 1j a• l• ` I 1 = e • �r�— _ xss t _. - t- • �3�s _ -_tri `_..Trz s.= a. 1 ver. • • • Pompano Beach Bermello Ajamil & Partners. Inc. (B&A) prepared a master plan and • landscape schematic design for the Pompano Beech waterfront. Waterfront Redevelopment • Pompano Beach, Florida The project entailed establishing a re-use plan for City-owned • parking areas facing the waterfront. beach dune restoration and the schematic design of the Pompano Beach Boulevard and the • Client:City of Pompano Beach waterfront promenade. • Size: 1 mile Completion: 2008 • Cost: $45 Million B&A carried out an extensive public involvement process to build • consensus as to the future of current perking areas,and performed • traffic, parking and engineering studies to evaluate traffic volumes ® and parking demand with the intent to creole open space in the area through the construction of a parking structure. In order • to meet the community's mandate to create a unique place • with o sense of identity, B&A identified curving Pompano Beach • Boulevard which created additional commercial waterfront land for an expanded restaurant/retail area and increased the • existing surface parking spaces to meet parking demands. A new • community park will provide additional recreation space alone • the waterfront where before surface parking stood. • 21 • • • iCoa ® Barmello Ajamil & Partners,Inc. • • . max. -. t. .it �.� • e _,_ -.00. ---s•„.1/2., G, . ata.�] 6 'Y r - Vin' •!�'\ r — ...-•:-:-.74.15. D.;,..--,7.--:--: • 1� _ ` Tr�.a_}�.ay; ..gam- • •..r4 w•✓ ..s k p .._i7 `'sT I® ?1` •• m -A,•�its. -,,---tit- ---; ,,- �' :.}"'" 1 -T — - , --- ay L— .�... �---7:-...--1,z", a----ei -et --N---. _ .L _ stn Vail 1-- .. �G {7 litar Jaii il ® �_ _IL/ plfr ,e ms`r 4: ii r ` . -k 11 111. � �1�� 4 /• \ sa'y.'� •'g+ leg ti • r. Q .erg " Oc x 1 ,.,+ - - _ .. - • r. i -._� ... s. r 1, C __+! ,_�P ` 7---,--N„...4744.1._ • sat*, .'r� a lb I irisd6riiSi�=• I lb-` ® .j jos : . ` .�.a`"°' Ste• i-l±'—AC ic, ,..:_ .,-r-.. ni, -,..e J >,♦ - - __ • v tet_ ' -- r V . �I^'_"r. r rT [` .1477.;r l \, mss r.,� ® pr•.}, `i "Lt' y`y� '�} -..� 1C7 r-:1.-. r ^� �` rr. • • ® Grapeland Heights Park Bermello Ajamil & Partners, Inc. (B&A) supplied construction Miami, Florida .management and supervision for a design-build projecinvolving • the creation of a water park, 4 ball parks and associated parking • Client:City of Miami lot, as well as a combined concession stand for the ball field • Project: Construction management patrons.The concession stand and restroom structure consists of a ® and supervision for water park and 2,360 SF two-story building complete with ADA-approved access. concession/restroom facility The ball park and concessions are currently in service. • Phase I Cost: $14.5 Million ® Phase II Cost: $18.3 Million The water pork includes on 11.454 SF pool being able to hold Phase III Cost: $1.5 Million over 300 people. The activity pool includes a river fun ride and • Completion: 2008 allows room for approximately 150 people. A secondary pool • accommodates 100 people. There is also a 5.366 SF stainless steel . resort pool with a capacity of 125 people. • • • ® 22 0 • • • • • • Cha • Berrnello Ajamil E. Partners,Inc. • Society of American Registered Architects • Professional Design Award, 2008 • l.A�f O•.� / I .iI t.`.{ri.,_ 'b''I MINI UI..fl. • .--,----- - ,„--,--„,,,--,-- • ibih„....7 ins° in • ow*".;...‘ � .vai < • y a �,k ARAGON AVENU •• -411Lttik .-da C40 3,�I'C ,/,,. L7.1S:, ail u:�i ~ --Y�r`��i -1,7 caasi�"'w0i ::e!:r; a :-' - I0 • �'kow'r�r:.`.a.i– it - - . )� t_.-�, — /I{` r-!/1,- �/� _ • 4ez 40'I T • t _.S. �- . ' .Ltt MTIC4 —avv—ac _ .. — �' ill I I writ • 1 O0 DaI . irlil • 1 •• •� •: • • ,: : 1,1 11,- • i, • ,. r Ilima I ".". LN.I, ........ l r . • _ 1 91 � � • ,,,'• .��emD .. n,,I k.....L-1-! \I '•I %li.„� 1 t f.: ,r • 11 • f T i II 13.114 a.. I • . . I,41.11 ALLEI' it'llitt • , Li ._ • , • - 1 � • • Museum Parking Garage & Aragon Berrnello Ajamil & Partners, Inc. (B&A) was Prime Consultant for Avenue Sheetscape Improvements the City of Coral Gables with regard to this parkin° garage and • Coral Gables. Florida streetscope project, providing full architecture and landscape • architecture design and civil enaineerina services. • Size: 633 parking spaces • 8 levels with ground floor retail Our Civil Engineering Team provided design, permitting. project • Cost: $12 Million management and construction administration for the onsite Completion:2005 water, sewer, paving, grading and drainage, as well as the of • roadway reconstruction, streetscape, drainage improvements • and offsite water main extension for Aragon Avenue from Ponce • de Leon Boulevard to LeJeune Road. Aragon Avenue included • full reconstruction of the roadway, sidewalk, landscaped islands, • crosswalks and drainage reconstruction. The team provided value engineered material alternatives in their design, keeping costs • down while remaining code compliant. • • • • 23 • • ICa • Bermello Ajamil & Partners,Inc. • • i [p iff�.��� t ., y E �y i' • i $' r • It; .f• f 7friP,,C :',;: ' k, e.1.4 IN rk 4 4.• "' -^ Cif ' - , .....iiire,,,.., .f.__.v„..11.L... . b..... ,. 4,,n At; il • Y`' ♦ 'Ytt �'S1 j, ! t `yt: `✓� .,4 "Cgs ir %t " %J ,1". .• .-.Iry • • oaf P tWr • � e '�' , 171.!41a- LIQ ,.® 1.12g iA• a e f .t;ill 1 , 1 . 1 . 1 1• • M 4` w`. _. r ,r rn'af nnn n s n 'Pt!"„vt R P n �.':,, ' ' • •• (f}+ _ ;y Y' • ,''� �J oat• 'uf'.I?"`- 4 A il 1•r • .1a a h J • t— moifi-1 A'`t r ) I . '"� / i''',,,/,'zi� 1�ni-Mc..-1.7.:17A• �p > r I J i • ZC:P L '911Yf. :3... • • • City of Miami Beach Parking Lots Bermello Ajamil & Partners, Inc. (B&A) provided the design, • Miami Beach, Florida permitting and construction administration for the reconstruction • of 5 parking lots for the City of Miami Beach. Our Civil Engineering • Client: City of Miami Beach team provided designs that included geometric layout, paving/ • Completion: 2004 eroding. drainage/stormwater management including ex- • Cost: $500,000 filtration trenches, and deep injection wells. • The most challenging part of this project was the parking lot • layout which afforded very limited space. The Team was able • to maximize the number of parking stalls by coming up with • innovative design solutions that were still code compliant. Civil • Engineering managed all permitting activities for this project • through Local County and City government public works, water and sewer management and environmental authorities. B&A also • provided construction administration services and certified the • facilities at time of completion. • • 24 • • • • • •• • Bermello Ajamil & Partners,Inc. • sts. . / \r . ,r� : • t e ® �_- a • /�c'""� -y .�, �� • C� f 'tea t • L • • en ,,I 1. 4- - a ril� �. .. • �� F'i4 t � • � laOle r' ! r env ,-..1- F 6 1 <� ei,��.`! i. . T •-' 1.--;.?!. �QY di 1 • .g.-1,„,..,..,....„--...- y �` • ~ . • vk. 1. . t .:�Yr y 7 ( l � ,� . 2 �� ,,� -441/2 �YQ . a �• t:---.144):_l ���3 IJP•i l"^' ' , �/ • x _L� s � .,r +� ~ ICS '�. ; r ;° , • • '��3 � ":2 ro�`veey jam ' c \ " ' _.:-...a _4-4 . \-11-...' r -..'9tl ti� ---0.- y^— % • .._\\\s-. ` ._ j11"----.1:�` /'.. sem L.E.,20/ 01 T �� 1. • -. � -r�' ,/c' • , • • Naranja Self Storage Facility Bermello Ajamil&Partners,Inc. (B&A) provided water,sewer,storm • Naranja. Florida droinage, parking lot design,permitting,and construction services • for this e-story, 129,000 g.s.f. self storage facility with approximately • Client: SSG Development 37 covered RV and boat spaces, and 1,200 s1 of office and retail • Size: 129,000 G.S.F. space on the ground floor. • Completion: 2010 • B&A provided civil engineering services which included 650 LF of exfllration trench, milling & resurfacing of S.W. 272nd Street, a • driveway connection permit for o new driveway abutting US-1,site • grading,fire and domestic water services.The project also included • obtaining permits from FDOT District 6,Miami-Dade County Building • Department, DERM and acquisition of an Environmental Resource • Permit (ERP) from the South Florida `Nater Management District. • • • • 25 • • • ! Qoa rtja • Bermelle Ajamil & Partners,Inc. • • N \S\ - ' _ ` P � - • , -. Vit--_ � k - , , ad . S t e , A r, rw ••,s t 'Yom'' .���PPPP / -Lin... � '.GsS.i „Jr,-•&._" • ,",�i, ^Er2'A' r...� ' • 'i�+;-F'i"S i£Y rttl' 1 ' i. '.;,t : ..:. ; fl C.istg. -:41 • =-`- b�,� .- •' ,fie iy„_,. • +i ltd rj-- _ ---'-_- "�—c • c • f / • /// [ -2\ ' --, , I_�. 1 • i/ • 7( . 44 ♦� � '� . 1,4":".. . J '141 N 4f. e. _ �\ c4 .t .••. 4 N" � r-.r-2 ,•yr.µ F I.'4 yw� m �": • n� . • k - - _ • • • Corona del Mar Streetscape Acting os the Prime Consultant, Bermello Ajamil & Partners' Civil • 8 Drainage Reconstruction Project Engineering and Landscape Architecture Teams provided design, • North Miami Beach, Florida permitting, project management and bidding assistance to the • City of North Miami Beach for this 2-mile roadway reconstruction • Client: City of North Miami Beach project. As par; of the project, extensive drainage improvements Completion: 2005 were required to help improve stormwaier management in this • Cost: $2 Million flood-prone low-lying residential area. • • 3&A's Civil Engineering teem designed a new drainage system • consisting of interconnected exfiliration trenches end deep injection • wells and carefully integrated the new system with the surrounding existing drainage systems to help alleviate flooding. To improve • aesthetics and functionality, the Engineering Team redesigned • the existing sidewalks and pedestrian crosswalks and reconfigured • locations of on-street parking throughout the neighborhood to allow • for streetscape improvements such as new landscaping,curb and gutters. B&A managed permitting activities for this project through • local County and City government public works. water and sewer • management and environmental authorities. 26 • • • ! Cba 0 Bermello Ajamil & Partners,Inc. • • � . . -Ar y t• n y4 ` • t .• � } ' \L ~ I1 a { S"* • ! ' ; ` art • it ® ^ �i{•. r `'� � Ill ��al 1 �s r =' . -JAIL_ r ••.I •t o •se d �• I y .tat / —• it, 1 �.t CZy1v • ; 11it(14 r _ }sem t -. • 1 • t1 •f 1YlSfr ,1 O • .- < -- � - •� � $:: ? tC� • • • FEMA/DERM Hurricane Irene and tropical storms passed through South Florida • Roadway Improvements in 2000 and 2001, producing 10 to 20 inches of rainfall in the • Miami, Florida Miami metropolitan area. The Miami-Dade County Department of • Environmental Resources Management (DERM),with funding from • the Federal Emergency Management Agency (FEMA) enlisted • the services of several highly-guolified consulting firms to provide roadway reconstruction and storm water management consulting • services. One of the largest challenges presented was FEMA's • street budgetary constraints. • • Bermello Ajamil& Partners' Civil Engineering Group was selected to • provide design reconstruction services for several miles of roadway. ® This included the design of roadway reconstruction, resurfacing, and drainage/storm water management improvements. The • design included plan preparation, existing condition reporting, • cost estimating and report preparation. • • 27 0 0 • 0 0 Cba• • Bermello Ajamil & Partners,Inc. • • 1`, • • ys 0 or ® • t . IIS : 1 s;, , r d •w�� 1 • o y � .z_ + \r 2 - "• - • • 1• J fp :4 :1 _ '4,- ,,x c i x , 'i �0 _ _ Th t -4n ,-r • I &' jtt _• _l r � c ../ • • • N.E. 188th Sheet Bermello Ajomil& Partners,Inc. (B&A) provided engineering design, • permitting, project management and construction administration Roadway Widening, Sheetscape • services for this roadway reconstruction project that entailed O & Drainage Reconstruction converting a 'A mile of a 2-lane roadway into a 4-lane divided Aventura, Florida roadway. The roadway improvements included new paving, • grading and streetscape improvements such as curb and gutters, • Client: City of Aventura sidewalks, landscaping, street lighting, striping and signage. • Completion: 2003 The reconstruction also included a new stormwater drainage Cost: $1.5 Million system that consisted of interconnected exfiltration trenches and • emergency outfall to the inter-coastal waterway and new water • service mains from N.E. 29th Avenue. • The Civil Engineering Team manaced all permitting activities for • this project through local County and City government public • works, water and sewer management authorities and assisted • the City in obtaining grant funding from South Florida Water Management District,which funded half of the construction cost. • Value encineered material alternatives brought construction • costs down and kept the project under budget. Efficient design and permitting allowed construction to commence and end • ahead of schedule. 28 • • • O o r---ba • • \ , • Bermello Ajamil & Partners,Inc. • • ® •NR ry}34. :, SiOP J '_�t 4xia : 21..5 . I.. 1 -1 a._t� ... r • • sm• :.w . �,�. ".. — � ri'eiry X�.-w - • "Aq.l+ iiV ;'•,. i� ...`mow",�Ir.:—" 4 ,0 • .`{.i �f , 1 nNaui tit` i,��J • C .•Cr- r %v•rf _ _ ! i I �1 .--...c.4.- ... .namii .. .71., __ _ i4 164. 1:44 -• 'e 'Midi • ; , • •.- o *- 42-3c.tit • ra._ en _ • ..xa 'rt' :. a • • ti - ° 0 0 • Washington Park Actino as the Prime Consultant, B&A's Civil Engineering and • Landscape Architecture Groups handled design, permitting, Roadway Reconstruction • North Miami Beach, Florida project management and bidding assistance to the City of North • Miami Beach for this 2-mile roadway reconstruction project. • Client: City of North Miami Beach • Completion: 2004 B&A also provided construction administration services, including • Cost: $2 Million inspections, testing and final certification. This involved drainage improvements which merged an existing storm drainage system • with a newly designed one, new extltration trenches and deep • wells and elimination of a Flood-prone low-lying residential area. • • To help beautify and more effectively use the narrow right-of-way. • B&A redesigned the sidewalks, pedestrian crosswalks, on-street parking and landscape. B&A completed this design on time, to the • satisfaction of the neighboring property owners,and within budget. • • • 29 • a 0 0 ® \ • ® �___ • Bermello Ajamil & Partners,Inc. • • ® 'J'. _ tit ,n,ar '^�: ��: fry {# - ' i- . I \ ® Frr1_ A �r Vit. 1• •'.' - ! re ---- — — -� iv ® ,0� c , - •( Y�r ® AJC f - A ' _ • ® mor." SrJ* ,.•. r ' j .itssir:- y 4 ♦� •�� 1} . L-s a-4•F r •-•?;."--, _ _ - 6� .0 Zr £ti •,t}' ' •3� 1111 t r ® JIPt sd c '1 s 4.-: ' C o • ,� •• !.ALS', T p 7 1�; .c._/_4.71f`I ftr% /,, L d s N', i+ 1 .•• C•rn c''', r ,ua y. ..y ¢ a - y 1 yl `^,.-,1 1».- ]`I Ix`' • . ail • DSII(._ rt. b iti y�• MrT�' ?' n 'i. _.•''ti'r 4... ? ` • e a • - tlr: .- t`+'�: Alhvi3i %" yr ta�-1 Q. .. Project images are before consturcHon e ® College Road Enhancements Bermello Noma & Partners, Inc. was awarded ;his contract by the 0Key West, Florida City of Key West. The project includes ;he construction of sidewalk • along the east side of College Road and to provide drainage • Client: City of Key West enhancements to the corridor. Bus stops will be upgraded to • Completed: 2010 (est) provide compliance with ADA requirements. Additional work ® Cost: $367,500 includes coordination with the Florida Department of Transportation • (FOOT) for permitting and environmental certification, preparation of a construction cost estimate,and attendance and participation ® at a public information meeting. B&A is currently in ;he finishing ® stages of preparing construction documents,front end documents, • and specifications in order to submit ;he package for bidding. ® Although the project was awarded by the City, the funding is provided by FDOT District VI through a Local Agency Program o (LAP) agreement. Therefore FOOT must provide concurrence with ® the construction documents. • • 0 30 w • • 0 O Kr:a• • • Bermello Ajamil & Partners,Inc. • • • I & . ; r� -‘ -iv- _ ® �� P Lill • • • , -0,10 II • ii K , ' • IiE. i. F-' y ..1 eEfR� ` �y�pY _ • 1tf r^'6® u b-et �7�{ ® ,� ia"�. r,ipr� f `\YJ t-I r I • -.-'• ,..1 '-s_ - - il'�l"l _tri t t j J I-41 �i� --;e.'„,. 1111111 .LCk r. f et, , _ r _ y 1. ry� r\ aC. .SIS 4 • • _ --=-e ti , • _ _ �. ' 4 .c . ; i • r�t'`ara � i } f • 4. � _ - 0 .va ® - ` . r '�_j • • 1�► +j • V alp i _ ;,..tee 't - j - ' ' ._ . . . • ® SR 922/N.W. 125 St. from East of N.W. Bermello Ajamil &. Partners, Inc. served as prime consultant for ® 7th Avenue - West of N.E. 9th Avenue the Resurfacing, Restoration and Rehabilitation (RRR) project on ® Miami, Florida S.R. 922, a 4-lane undivided arterial. Roadway work included • the milling and resurfacing of the existing asphalt pavement, • Client: Florida Department of improvements at each intersection in order to provide standard • Transportation, District VI pedestrian ramps complying with ADA requirements and • Construction Cost: $2.5 Million of all driveways within the projects limits. Upgrades Completion: 2004 to six existing signalization spun wire systems consisted of installing • new most arms, including a mid-block pedestrian crossing. Some • small tree removal was required. • • At Bridge No.870671 over the Canal C-8, the scope of this project • included the replacement of the existing substandard railing. A new aluminum pedestrian and bicycle roiling was added, os • well as a new traffic railing barrier. Pavement markings and signs • were also upgraded. • • • 31 O O ! Coa O Bermello Ajamil & Partners,Inc. 9 0 • 7' i • M • O !J � w j 7 9 gra _. ♦ c�%aLY t ♦, { _ ® 1 ♦ { ` a 2 Vs'- r4- J ® A' LC A a ` .. � � s- f fl) - �� lirst� 1 O � '4 .. 'ii .v,- "s s it ca_ O - - a`„._S _ _tt - -- ® ! _ -rte .. �-�; - ® w. - - - 0 ,t 0 v, y ® -� • / �.. fz _ 8 ® i aP O O ® S.R. 922/N.E. 125 St./123 St. Bermello njamil & Partners. Inc. designed safety improvements for ® from West of N.E. 9 Avenue to this corridor of S.R.922,a 5-lane undivided arterial, based on safety • East of Biscayne Boulevard enhancements. Many of the existing trees and light poles were in ® Miami, Florida close proximity to the roadway, resulting in numerous accidents 9 along the corridor. In order to correct this problem, all light poles • Client: Florida Department of were removed and new assemblies were installed at the back of ® Transportation, District VI the sidewalk. Cost:$540.000 ® Completion: 2006 In addition to posing a safety hazard, the existing trees were • uplifting sidewalks as well as the curb and gutter. This resulted ® in drainage problems, leading to water ponding. New trees with ® non-aggressive roots were planted at the back of sidewalk and ® root barriers were installed to prevent reoccurrence. 0 0 0 0 32 A • • • • / lia • Bermello Ajamil & Partners,Inc. • • • + - NW 109 AV "S 04 - _Si , .�y � +t t • ' d,./c. N--, • 'rb.... ' . ' � • ee - - al� ac.• 1 ` • r :r` , 40 � * ,• ` � • �.. • fin. � rr '. .�_ • • s �• .. • - G4y x r arr • Ilk Y a r . ',� ,i:1T ttel 1. %s - 1.. • 49► - / $Hid. - •-1• I , ,:;s . • � :` j 3 �` '• d �' 11 1 ) t. . �' a�(3 I y 4I. .'�.. • )f • • CE&I Services on a Continuing Bermello Ajamil & Partners, Inc. (B&A) is currently providing Basis for the D/B of Traffic Continuing Construction Engineering and Inspection (CEI) - services to the City of Doral for several design-build traffic calming • Calming Projects • Task Order #1 projects. • Doral, Florida The tirsi project that B&A was assigned is divided into two separate • Client: City of Doral locations. The first is the installation of splitter islands at the • Completed: 2010 intersection of NW 109th Avenue and NW 78th Street. The second • Cost: $377,000 is the installation of a traffic circle of the intersection of NW 100th Avenue and NW 86th Street. • • B&A is in charge of leading bi-weekly coordination meetings with • the City and the contractor, assisting the City with preliminary • plans review, coordinating with the Miami-Dade Water & Sewer Department (MDWASD) on relocating fire hydrants, monitoring the • project schedule and providing certification of pay requests from • the contractor, maintaining RFI, Shop Drawing, and miscellaneous • request loos for the City, and coordinating reports on the • contractor's progress. • 33 • • IQoa • Bermello Ajamil & Partners,Inc. 0 0 l n 0 — _ _ .� ;. y ..,,s.-p ,,r wnart�. .F 1 is • Y^ � _—._• It1 --i1 +�' til, f . it • yam; •�'1FT • 4 1 i;• x 7}r C&.- wt.c tits' %a t; • • �c.3.„ m'� '4'- ., r'14 _ I i • • a t a. - 1:„�r-.r - i Y.ri�L V ti,. 1111 F a • Y'y`»Ci+,.. s a I r l Atal-, ta• rt $ . r... • a� f a, 'iO`--• Y/�{�s'�� - rl I 5• }�. - t "`• `'r`. Sy ¢ C.E. • • • • N.W. 3rd Avenue nermello Ajamil & Partners, Inc. performed CEI services for Miami, Florida the reconstruction of N.W. 3rd Avenue in Downtown Miami. • The work consisted of rood milling and resurfacing, drainage • Client: City of Miami improvements, water line upgrade, curb and gutter installation, • Cost: $4.3 Million sidewalk replacement, ADA (American Disability Act) accessibility, • Completion: 2008 landscaping, and streetscape improvements. These improvements • were funded by the Community Redevelopment Agency (CRA) • and included: decorative bench seating. lighting, signage and traffic signaling. • • • • • • • • • 34 • • ICoa • Bermello Ajamil & Partners,Inc. • • • .,• ' -}. . .1 ii ...„--,--_-,---..,..— rio,!—Ert : I. ,, ,_ LJr.,-:>> � ss /• jjfra : ' � ( s • y i ♦i,• ' t„ , .k r� r i. 2. • ,V 111/' ,•_a'u ” �rJ • t �r+�l ` r- __ s • I ti ti -.7--,-..,--r". -" 'I: ' ' .-s-• .,''- i-'' - --- as • f--- --, ,...." ' v --...,k: ‘7.1- t: 1..- ' -..444.1 .- .., • • J 2' -�• . - - r i.. ^i ti E -_._ • �_ i� 74k ta�, ._,_mac reT- S L L • • 0 Construction Engineering & Bermello Ajamil & Partners, Inc. (B&A) is providing construction, Inspection (CE&I) Services for engineering and inspection )CE&I) services for 4 roadways located • in the City of Key West: Northside Drive, Truman Avenue, 17th. • Various LAP Stormwater Projects Street. and 20th. Street. Stormwater mitigation measures included • Key West, Florida the construction of catch basins and Gravity injection wells with curb sidewalks and asphalt restoration. As the project manager, B&A is • Client: City of Key West providing doily inspections,documentation,submittal reviews,field • engineering, materials testing and other specialty services. • Services are provided in compliance with Florida Department of Transportation (FDOT) construction, engineering and inspection • procedures for Local Agency Programs (LAP). • • • • • • • 35 0 0 • lOna • Bermella Ajamil & Partners,Inc. • • • 1 r I • -7 i' • 4 '.,‘.; €- ! . -,,..kirdr.--rr. ,-...„.1- ; • 4(-V` +` - -tit . •?tea n <1 . 7f!...5". n ±-RIPT y. t Rt J- .o.",44 ,' ftp -�Ti��\ • • �/� .� - Ty'S \ ,fit .i. v= �£' s -. '~ 0 - •f �_ 14.---: .- _ _ -$stir ' • • \ i 0 CO I a< • t rit $ X y t o • • ' • " Ir • • (6;1- . • • • Bahia Honda Bermello Ajamil and Partners, Inc. (B&A) was prime consultant • Big Pine Key, Florida for this resurfacing, restoration and rehabilitation (RRR) project for 1.82 miles of SR-5 (US-I/Overseas Highway) from south of Mile • Client: Florida Department of Marker 37 to north of Mile Marker 38 in Monroe County. • Transportation- District VI • Completion:2008 Improvements consisted of pavement restoration by milling • Cost:$1.7 Million and resurfacing the existing roadway. Drainage improvements • included the design of a dry retention swale. Ditch bottom inlets were placed CT the bottom of the wales in conjunction with • extiltrotion trenches to provide some water quality treatment • to surface runoff prior to flowing into adjacent water bodies on • either side of the road. Construction began in April 2008 and wos • completed in September 2008. • • • • • 36 0 O ICba O Bermello Ajamil & Partners,Inc. Society of American Registered Architects, Design Award, 2003 • Gold Coast American Planning Association Award, 2nd Place, 2003 • - O :.7477,.? ® v. r . ._ • ti " O - � • J ' � ,dA ,7 �k -_ O ` ® \ r 4�,; „ `°�°rr - # ;.rte =5 iir-1"' ® ysv. l-, 1--z-_-- ----------tit 4.r x ® 1)141 ,a e tt`;"*•`,\ Ai.yr Fn • ,-. c r wOw any�+ \;� .'i�' ,��`�r'r=te .•I 5, .4,-.,,,,,,,--' - _ _l tl \ �ttkt\�,}�\f1r 7� 1,Y�\ \�( )rk •l•'� � ! , -.'...••.:/?,', .41 '‘,q ry. \ l S 's' } r FiS\\`fit .. r.�4i L� �M- '• I • ':r t v: ✓:,. frii • 11Ni . ,T '�a l ti(. A saw -^yam- c ,�i " V i "'tt -,;57.1.:, \ ill r ci . , - - - r . '''''''::14:1" .-irt'ains::tle*Ttli:1144771%.4 ® _c. - _...,-c-2-' `�. �i _-_ _— //L _lY ' Ji _ - - T - O • O Margaret Pace Park Bermello Ajamil & Partners, Inc. (B&A) provided the programming. O Miami. Florida master planning, schematic design, design development and O construction documentation for this 8.25 acre waterfront regional • Completion: 2002 urban pork. Extensive coordination with the Civil Engineering O Size: 8.25 acres and Landscape Architecture Teams rendered a highly successful . Cost: $3 Million project that combined aesthetics and functionality to create this . award-winning facility. • B&A's Civil Engineering Team provided on-site design, project • management and construction administration services, including O pavinc,grading and drainage,stormwoter management,as well os O water and sewer services for this urban redeveloped park located a few miles east the burgeoning Design District of Miami. The Team • managed all permitting activities for this project, working with local O water manacement and public works departments, and providing O value engineered material alternatives in Their design, keeping O construction costs down, and concluding the project under budget. ® 37 O • • • • rba• • Bermello Aiamil & Partners.Inc. • • 'y • 1 �4p � :� C "'.Q1111 111 Mm� 7f 1 BiiPiir7i.iw7 l:-oi rnin Ji - _4..aa.u■.■q • gt ® 1 t���p 1•-• t711T7111i wl,a ■ua<. tooth - re ��uf„"oO d ---.- • ' T I., I pmrEril iit t .: 1� a . . ` '®• Inn 'I 111i11IQi ., m1•• . .i- ' 11n 7'la � 1 • Q'191; HJL • y- pd ��rinmF Duorlrer o -e o�iaW-rr .1 n� m m In r to •■ y, Doan■ 1law�q- una .� nnao 1 ® II� 1 rGl 1..�••" tm m p1.t L 6" cilli Ei v41i�e�i�a�'trim+�c -:-.41"ii E r • 1 -. •00- 1T7a■IB115 �i ■■ ups l-Ooilaaai ,f? _ Alfa = i as _. r;: iiacru■ ,s■ 1 ® _ 1 ' ,� • •iel Tj1117Q .i _�. . alllal)111aLlicomffir ,. ulnCllo♦ _.�. .Porimao �µ ii ® a� "� f ,. ,'m m fl'Y ■ 1 •• i al to laallef non m 3u1M =amine n SIIT_rri_ li r Hi eafaaeullw■, + ■luafr n5- a•atu■ nor •. til soiti If 1 • t _ �� _ nfl w1.01 m!Lt fit i sting .l •a �=eaatoai•4-nista :aaf■ua■ . • l ••`, .�rye -W IIL Ia t • 'i. •• t - ritliRiOuf■■ l J uiiM'a.■ ■■ 1 • 1 • it--a , '■A r - �• a I. to 1.„ , �■0000a1II1a1M t•-a■ll 10■i-_m N•_ _is II luau . .. • Fill 111 til i - }1� i is p -W rnEv til fll 10. .S1"' 1 le,iL66 111111F-11 r:-an,m■a11 na::: ;;aril .. • gar pais . r+3F.: 10111`111I . v - w�yaac ■ l �p¢ga�■a •■ ■ t1--- III i • �° Y rri 11 I [It:, u.,.l ----a f l • co.."-.1,-0, 1-- I _ _ • y�•y� -�_,r ,' .{r IL-1 �. r_ • 1 —s"^_-....7.1-, `�Jam .- �^+ . ` _ • • ■ �`..:R Y.[- ,, - - . ' . - . . i �'i..-•T—T_._ _ -G-� - '^� - ' t Cain°'{ n -; �-, "t. --- - - { ' ,amu_ --.." i _.at 11' 3 f i-y ,^ • s5=- ?tr-i�� - � �Jr'-�- aleTk7r�_ . - �f•._ 'a'L��"". ��. � • - � P • • Miami Circle Seawall Bermello Ajomil & Partners, Inc. (B&A) was commissioned by the • Miami, Florida State of Florida's Department of Management Services to help re- • place a deteriorating concrete seawall that threatened the secu- • Client: State of Florida rity of an important archaeological artifact known as the "Miami • Department of Management Services Circle". the only documented village site of the Tequestc Indians • Cost: $1.5 Million of South Florida. The current seawall was in severe disrepair and Completion: 2009 required total replacement. • • B&A provided full service marine civil engineering services from • design through bidding for a new cantilever steel sheet pile seawall • in 15 ft. of water. The new seawall was designed to be located • within the existing seawall footprint. The Stole had also stipulated that tiebacks were not to be used. B&A was also commissioned • for emergency temporary repairs on the current seawall following • o site investigation conducted by one of B&A Civil Engineers when • c portion of the existing wall was discovered to have collapsed • into the river. The emergency repairs consisted of stabilizing the • riverbank with gabions and relieving soil pressure on the remaining • portions of the seawall. 38 0 • o e Cba 0 Bermello Ajamil E. Partners,Inc. o Professional Design Award ® Society of American Registered Architects, 2002 • r-- t T1 U pone • til d` 11 "Ciiit 1 �0 ` : O Ilppll, pin now �sppinn Z ntit1Gp t ' ..' 0 CI 1 /. 11 ' 1 II -.4.4,9:1.--A it .- :„1,-kict_t_I-t"::'';''''.4.:1', ; • II;lo a • Y y 1 1" �-_ � �.e� .S5 fir—„ 11- • y .�, %, 1 w '=!sv cv ( f MLF 4 0 1 yifrr4..T'.b S: '3 - ' . �1 } 0 O 1800 Club Bermello Ajamil & Partners, Inc. (B&A) was assigned a project for Miami, Florida 570 Condominium/Apartment Units along S W. 72nd Avenue south ® of S.W. 82nd Street and north of Snapper Creek Canal. The firm o Client: BCOM, Inc. proposed approximately 1250 LF of 15-inch exfiltration trench and o Units: 450 residences half-width milling and resurfacing along SW 72nd Avenue, as well O Parking Capacity:9-story parking garage as 2000 LF of 12-inch water main extension. • Construction Cost:$48.5 Million Completion: 2006 In addition, installation included a 6-inch DIP for domestic water • service, 8-inch DIP fire service and a 2-inch water service for • irrigation for all four building within the areas, along with a 1000 LF ® of 8-inch DIP sanitary extension. • B&A also supplied coordination, field visits, approved shop • drawings, response to RF-I's and completed all necessary forms o from the different agencies. 0 0 • 39 _. a • * CI:pa ® Bermello Ajamil & Partners.Inc ® Construction Association of South Florida - Croftsmanship Award ® Associated Builders & Contractors, Inc. - Excellence in Construction Award ® El - II‘K 1� ��T r`Y y t -7-:#77-- l r )�xi r. ..$ I. -� idileil t �.. **::01..**}V a lI '.I_1 _III r i : o la 'III �vi (a_ • �,S.F�t � 13 Ilil� �I"11r k1,011 .f' `� � 1 trl. 0 dill) � . �� f, ~ s a 'Ht-1ji F�5JC,L tl II Ili_ • ,... ••••;;;11.e..-T. M' tril _ j ,. 1 i ur f� i I I I1 f r ' .�j ,,, ,,,......„..,:„......i , J „ :„ • t ® fid I'+"_J"•/e r F i ..••••''' '. ` +�r� �- /1 (Frt. _T L .•a 4 '., �I in Ij• is , ! ,t •i,l •TT. 11 ( We i,40_1 r ., n ', ;.- V a- �,__� m •a ® T.i . /re »11 !fel "W f ` r yt r vu h+j � •v �► a • /��Cty. A. t .. =tr I_ 1 J ® •.2 Y' p '_rH: 1.` liX.L -�n E.e i- • " •'Ct "rA."' ,1+rpx T IlI F`� �'' M ® x••'; 7 r,r !• r '. W y 'wt#r~t 1,IT' -."t ((F:A".-* t2g"r 4;;;- -- 1 Sr ,yy r ® , sty 1 ,�,? ': s (J ,Z�i •�r� 1 'I ., ties (1( I '' :- 114 41 A .'%) 4' v , : , r krie,t ti il A • liik- 1 _ . : _ ® �.>.r, v..,E2i, d- �ifi. jiE jai;S�lmu an �._ _ I ',� y4t O The Colonnade Bermello Ajamil & Partners, Inc. (B&A) carried out work for 570 s Miami, Florida condominium/apartment units along SW 72nd Ave south of SW 82nd St and north of Snapper Creek Canal.This consisted of 1250 LE b Client: Lennar Homes of 15-inch exfiltration trench and half-width milling and resurfacing ® Units: 560 along SW 72nd Avenue, 2000 LF of 12-inch water main extension • Cost: $65 Million and a 6-inch DIP for domestic water service, with 8-inch DIP fire • Completion: 2007 service and a 2-inch water service for irrigation for all four buildings, • plus 1000 LF of 8-inch DIP sanitary extension. ® B&A obtained all necessary permits from the relevant governing A agencies: MD-WASD. Department of Environmental Protection, • Miami Dade County & DERM and provided coordination, field • visits, approved shop drawings, response to RFI's and completing ® all the necessary forms from the different agencies. 5 40 A • • • •• Cba• • Bermello Ajamil & Partners,Inc. • •• . Zara ' • - ., . T rdi t If -`n 1:1 • ` fd tl — • ,• 032 it .. a • tom' k ILL l • . r o 424 , 1• . aFa —•It'IO V _� • _�t • q# II s ,_.N I = �s , 1 .yro- • � 1 Com^ rH -ft I u' • '-lir r • :; r . • 441 � -i lµ4c? I afib. . r. n u � ) rl.-'-'' i h`� • .ziz•l':%14. C . _ s � r �' d , • II � y Ater rr • � e - ' ' • ` : ---4,"•":C�4 4;7" 'i\ ! � � - • � - - . l �• (4A: . S. �v . ` f� ,'u • • NEIf Yt - 4 )yr {{I •• • 610 Clematis Bermello Ajamil & Partners, Inc. (B&A) was the Prime Consultant • west Palm Beach, Floridafor this premier redevelopment site in downtown West Palm • Beach,one of several properties included in the City's Downtown • Client: BAP Development Redevelopment Plan. • Site Area: 2.1 Acres • Project Size:596,000 GSF B&A's Civil Engineering Team designed and provided construction Condo Units:259 administration for this 2-acre property that includes a 9-story high- • Retail: 11,000 SF rise condo. The design incorporates new roads. drainage, on-site • Parking:360 Spaces water, sewer, paving, grading and drainage, off-site water and • Completion: 2005 Cost: $15 Million sewer main extensions. The new roods allow on-street parking. • landscaped islands, and a new drainage system. B&A managed • permitting activities on this project through the City of West Palm • Beach Public Works/Utilities Department and the South Florida water Management District. • • • • 41 • 0 0 lOna • Bermello Ajamil S. Partners,Inc. • Society of American Registered Architects. Design Award, 2004 AIA Miami Design Award, 2002 • • (p• ..• iC� , I • , tet 1 i , �; ' r.off "—I 11;4 Y- . 191 r id I Choilaft- 44Irl.- 1 -` • - I i.-. . - -1-‘4• _ -#:. r�Y fit ; OO r - - „rte_ i' '•L'' .'•, F --res; t •or• Tl �\ L o .. cXr"_'M, 311"74 "" a� I ' i s� "15.4' `r o �� `��.—E r-�:Y.----cc.--� • :s., TitilstrEz-fi ,,,,-.Pc. j 1-.,.1 • � o .•rte .....u..r'0. .l' .4 e'. •:•1� 0 O Four Seasons Hotel & Tower Bermello Ajamil & Partners. Inc. (B&A), in a Joint Venture with • Miami, Florida GEHA, designed this mixed-use development located near • Downtown Miami. The firm provided architecture,civil engineering O Client:Millennium Partners and landscape architecture design services for this mixed-use • Size: 70 Stones development located near Downtown Miami. Residential Units: 84 0 Hotel Rooms:221 The Civil Engineering Group provided design. permitting, project 11 Parking. 1000 management and construction administration services to develop Project Size: 1.8 Million SF 0 the infrastructure for this 70-story five star hotel/office/condominium Cost:$225 Million o Completion: 2004 with 6-level parking garage. The project incorporated '/z mile of o sanitary sewer reconstruction, ''/ mile of water main extension, • paving,grading and drainage with stormwoter containment system o which included deep wells and an emergency pumping system to back-feed to the wells during high storm activity. This project also o included roadway reconstruction and drainage improvements. 0 0 • 42 • • • ORGANIZATIONAL CHART •• • • \V NNi IS(F • V�a I *; • •• '��•ILO� 11\ • • • • • BERMELLOCATM 3' X L ( (CL(s •• Principal in Charge • • LUIS AJAMIL,P.E. • Project Manager • JACK YOUNG,P.E. • • • QA/QC Public Involvement • DR.CARLOS BONZON,P.E. TERE GARCIA • • • • • BERMELLO er ' IQi • 02410 Engineering Geotechnical Engineering Construction • • NOBEL VALENCIA,P.E. FRANK TFJIDOR,P.E. AUREUO MATOS.P.E. • GERARDO DRAGON! .. • • • • • • • • • • • • • • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFO No. 12-04-02 43 • • • • • • • • .- _-_ Luis Ajamil, P.E. • President, CEO • • Professional Experience • Luis Ajamil is President and CEO of Bermello Ajamil& Partners.Inc..an award-winning international '._\ multidisciplinary design firm. Under his leadership, B&A has expanded its worldwide presence to • �' •' become one of the preeminent firms in its field.A consummate visionary who believes in providing • .. . :.� service on a global scale. Mr. Ajamil strategically expanded operations to include B&A offices • ' 5�°3 across the United States from Florida to California and abroad in Dubai-embracing the opportunity • to serve that burgeoning market.Mr.Ajamil is a Planner and a Professional Engineer with a variety � ' f of experience ranging from innovative master planning projects to waterfront developments to • transportation and engineering related projects. RELEVANT EXPERIENCE • Miami-Dade Expressway Authority (MDX) General Engineering Consultants, Miami, Florida - Mr. • Ajomil was Principal in Charge for a joint venture team serving MDX as their General Consultants. • Projects under planning and design stages included:SR 836 interchange.LeJeune Road interchange with Miami International Airport,Miami Intermodal Center(MIC),and SR 112,including the planning • EDUCATION and design of the SR 836 to Central Parkway interconnector;SR 836 westward extension to NW 137th • Bachelor of Science in Avenue,and interchange with Florida's Turnpike,with provision for toll plazas;SR 112 improvements Civil Engineering, • University of Florida, 1972 and connections to Miami International Airport and Miami Intermodal Center. Also under planning • stages were projects,which include provisions of Long Range Express Lanes or Value Pricing Lanes along SR 836 from Florida's Turnpike to the Miami Intermodol Center and the Miami International • REGISTRATION Airport,this includes approximately 8 miles of expressway reconstruction,with four interchanges. • Registered Engineer • State of Florida, 1974 Margaret Pace Park, Miami, Florida - Principal in Charge; directed project team that provided Reg.No.0018e20 programming, master planning, schematic design, design development and construction • documentation for this waterfront regional urban park.Park includes 4 tennis courts.2 soccer fields, • PROFESSIONAL AFFILIATIONS tot-lot and children's play equipment,vita course,street and water oriented urban plazas,waterfront • Greater Miami Chamber promenade,shoreline stabilization,picnic shelters,security lighting and landscape improvements. • of Commerce Lummus Park, Miami Beach, Florida - Project Manager; This project marked the first reconstruction • Leadership Florida American of Lummus Pork along Ocean Drive in South Beach.The park was the fu-st project involving shifting • Association of Port Authorities Ocean Drive toward the east to create the larger sidewalks along the west side of Ocean Drive. • Florida-Caribbean Cruise This made possible the resurgence of Ocean Drive as one of the most successful people-gathering places in all of Florida.The linear pork then involved creating meandering wide sidewalks designated • Association,Platinum Member as both bikeways and roller skate zones separate from pedestrian areas. • • Harry S. Truman Presidential Park, Key West. Florida - Principal in Charge for a 23-acre waterfront • master plan.The park incorporates a 50-foot-wide waterfront promenade,on open air amphitheater, a Turtle Rescue Hospital, a 15,000-SF event plaza with tent structure, a renovated Navy Generator • Plant to be reused for a restaurant and historical museum, a dockmaster facility, an interactive • water feature, exercise trail,outdoor zoological exhibits,a ferry terminal,a 60- boot marina,fishing • pier and a new recreation complex for the adjacent residential community of Bahama Village. • South Beach Park, Miami Beach, Florida - Project Manager for the transformation of fallow Federal • property in the first South Beach park.The pork included a tensile structure bandstand,horse stables • and multi-purpose lawn with utility modules to allow outdoor art shows and festivals.This park was • developed in anticipation of the renaissance of South Beach and the introduction of high-rise residential developments along its perimeter. The master plan also included sites for a restaurant • (since built), parking and a connection of the then-existent fishing pier. • • Turnberry Isle Yacht Club, Aventura. Florida - Project Manager for Turnberry Isle Yacht Club • development in Aventura, Florida.This project, part of the Aventura complex,involved three major condominium towers, yacht club, country club, and marina. Mr. Ajamil was responsible for the • design of all land development programs including bulk heads, grading, drainage, paving, and • utilities. Mr.Ajamil was also responsible for utility systems designed to serve the Fl, F2, F3, F4 and F5 • Cba > www.berrnelloajamil.com as 0 • • • • • • • • Luis Ajamil, P.E. • President, CEO • • sites which provided for ten 28-story condominium towers. It included several master list stations to • be dedicated bock to the local utility company. • Aventura Mall, Aventura, Florida - Project Engineer and manager for land development of the • Aventura Mall.This is a 1.4 million square foot mall with four major anchors and two additional future • anchors. The site plan called for filling a half-million cubic yards in the parking lots to make this flat site into a two-level lot to serve the entrances to this 2-level mall.The drainage system was integrated • into an adjacent state road limited access right-of-way and included a drainage basin with existing • sub-divisions which had to be rerouted through the project. The internal ring road of the project • allowed for the development for 4 out-parcel sites now developed into office complexes. • FDOT District VI,Miami, Florida-Principal-in-Charge for several FDOT assignments including: • • Kendall Drive widening PD&E and final design • • Florida Turnpike widening between Kendall and Sunset Drive • • 1-95 expansion between SR 836 and SR 112 • HOV lanes from 1-95 to SR 112 and Metrorail • • Principal-in-Charge for the preliminary Port of Miami Tunnel PD&E Study • • Port of Miami Access Bridge, Miami, Florida - Project Manager responsible for the management of the new Port of Miami high-level bridge. As the Owner's representative. Mr. Ajamil directed all • aspects of the planning, corridor selection, and project approvals. Mr. Ajamil prepared the 4(f) • statement,as well as obtained necessary Coast Guard and Florida D.E.P.permits for this project.The • project was undertaken by FDOT District VI. • OTHER RELEVANT PROJECT EXPERIENCE • Mr. Ajamil has also been involved with roadway and transportation design for large scale land • development projects,which include the following: • • Civil Engineering Roadway design for the development of Turnberry Isle • • Civil Engineering Roadway Design for Aventuro Mall • • Civil Engineering Highway Design for the development of the Hammocks,a 3,200-Acre PUD • Mr.Ajamil hos also led large public sector transportation projects,which include: • • Preliminary concepts and design for the Miami Intermodal Center • • Design of Maritime Park for the Port of Miami,and all of its intermodal connections • • Development of an intermodal transportation plan for cargo movements in Miami-Dade County • for the Port of Miami • • First sector for the northwest extension of Metrorail along NW 27th Avenue • Water and Sewer Department Pump Station No. 33-N, Miami-Dade County, Florida - Principal-in- • Charge of the design of pump station No. 33-P1 for the Miami-Dode Water and Sewer Authority. • This major pump station was designed to both collect and repump sewage from several major distribution areas in the County. • • HONORS& AWARDS • Herbert M.Schwartz Community Involvement Award, presented by the Florida Engineering Society Principal of the Year Award,presented by the Florida Institute of Consulting Engineers • Bil Colson Leadership Award,presanted by Leadership Miami&the Greater Miami Chamber of Commerce • Award of Honor,South Pointe Park,Miami Beach,presented by American Planning Association and • American Society of Landscape Architects • Award of Honor,South Pointe Development Strategy, presented by American Planning Association Award of Honor.Port of Miami Expansion,presented by Florida Institute of Consulting Engineers • Award of Honor,Passenger Terminal No.5.Canaveral Port Authority,presented by the Florida • Institute of Consulting Engineers • �ba Fame Award,Carnival Cruise Line Headquarters D m • www.berelloojomil.com 45 • • • • • • • • • Jack P. Young, P.E. • Senior Project Manager • • Professional Design Experience - '��'�. Mr. Young has 42 years of professional experience in civil engineering. He has created master plans • j .\ for water,sewer and storm drainage as well as supervised design of collection systems,pump station • networks and sewer disposal systems including percolation ponds. injection wells and reuse of golf • r courses. As projects proceeded through construction, he made periodic site visits, resolved field • construction problems,coordinated multiple contractors and final tested and started up facilities. • ,-'r�- - t r..,-,� RELEVANT PROJECT EXPERIENCE • � . �- + George Brummer Park, Pompano Beach, Florida - Senior Civil Engineer. Design of a 5 acre new • ,/ . 'r neighborhood park including surface parking lot. Responsible for all civil engineering design and • development of construction documents for the Demolition of existing facilities; Modification to traffic flow patterns; Relocation of existing utilities; water supply & distribution; sewer collection; • stormwater collection; road & parking lot layouts; paving, grading. and drainage for paved areas • including sidewalks & pedestrian pathways; permitting with regulatory agencies; Services during • EDUCATION project bidding,award. &construction;and Final certification to regulatory agencies. • Master of Engineering, University of South Carolina. Doral Dog Park, Doral. Florida - Senior Civil Engineer. The project consisted of a dog recreational • 1966 park. Responsible for all civil engineering design and development of construction documents • for the Demolition of existing facilities; Modification to traffic flow patterns; Relocation of existing Bachelor of Science. utilities; water supply & distribution; sewer collection; stormwater collection; road & parking lot • Civil Engineering. University of layouts;paving,grading.and drainage for paved areas including sidewalks&pedestrian pathways; • South Carolina, 1965 permitting with regulatory agencies; Services during project bidding, award, & construction; and • REGISTRATION Final certification to regulatory agencies. • State of Florida.Registered Engineer,No.45646 Witlkop Park,Homestead,Florida-Senior Civil Engineer.Redevelopment of a 2.5 acre neighborhood • park. Responsible for all civil engineering design and development of construction documents • for the Demolition of existing facilities; Modification to traffic flow patterns; Relocation of existing • utilities; water supply & distribution; sewer collection; stormwater collection; rood & parking lot layouts;paving,grading.and drainage for paved areas including sidewalks&pedestrian pathways; • permitting with regulatory agencies; Services during project bidding, award. & construction; and • Final certification to regulatory agencies. • West Drive Park,North Bay Village,Florida-Senior Project Engineer.Responsible for the design of the • drainage system and making recommendations for the water and sewer for the'A-acre waterfront • park.The design for the park incorporates a new stage,restrooms,playground,exercise path,picnic • shelters and docks for local boating and canoeing enthusiasts. • Harry S. Truman Presidential Park, Key West. Florida - Senior Project Engineer responsible for • managing all of the civil engineering for this 23-acre waterfront site. The park incorporates a • waterfront promenade, new marina,an open air amphitheater.a Turtle Rescue Hospital.an event • plaza, a renovated Navy Generator Plant to be reused for a restaurant and historical museum, a • dockmaster facility,an interactive water feature, exercise trail, outdoor zoological exhibits. a ferry terminal,fishing pier and a new recreation complex. • • Atlantic Boulevard Improvements, Pompano Beach. Florida-Senior Civil Engineer. Redevelopment • plan for the only beachfront area of the City.The project scope includes the planning and layout of public amenities and beachfront activities and streetscape and public open space design. • Responsible for all civil engineering design and development of construction documents for the • Demolition of existing facilities; Modification to traffic flow patterns; Relocation of existing utilities; • water supply&distribution;sewer collection;stormwater collection; road&parking layouts;paving, • grading,and drainage for paved areas including sidewalks&pedestrian pathways; permitting with regulatory agencies;Services during project bidding, award, & construction;and Final certification • to regulatory agencies. • • Cba D www.bermelloojamil.com • 46 • • • • • • • • • _ _ Jack P. Young, P.E. • Senior Project Manager • • 4th Street Improvements,Homestead, Florida-Senior Civil Engineer for this CRA project.Responsible • for all civil engineering design and development of construction documents for the Demolition of existing facilities; Modification to traffic flow patterns; Relocation of existing utilities;water supply & • distribution:sewer collection; stormwater collection; road & parking layouts; paving,grading,and • drainage for paved areas including sidewalks & pedestrian pathways; permitting with regulatory • agencies;Services during project bidding,award,&construction;and Final certification to regulatory agencies. • • Harbor Village Improvements, Pompano Beach, Florida - Senior Civil Engineer. Responsible for all • civil engineering design and development of construction documents for the Demolition of existing • facilities;Modification to traffic flow patterns;Relocation of existing utilities;water supply&distribution; sewer collection;stormwater collection; road & parking lot layouts;paving,grading,and drainage • for paved areas including sidewalks & pedestrian pathways; permitting with regulatory agencies; • Services during project bidding. award, & construction; and Final certification to regulatory • agencies. • Parking Facility for the Homestead CRA, Homestead, Florida - Senior Civil Engineer. Responsible • for all civil engineering design and development of construction documents for the Demolition of • existing facilities; Modification to traffic flow patterns; Relocation of existing utilities;water supply & distribution; sewer collection; stormwater collection; road & parking lot layouts; paving, grading, • and drainage for paved areas including sidewalks & pedestrian pathways; permitting with • regulatory agencies;Services during project bidding,award, &construction;and Final certification • to regulatory agencies. • Naranja Self-Storage Facility, Naranjo, Florida - Senior Project Engineer. Provided water, sewer, • storm drainage, parking lot design, permitting, and construction services for this 4-story, 129,000 • g.s.f.Self Storage Facility with approximately 37 covered RV and boot spaces,and 1,200 s.f. office • and retail space on the ground floor.Work included 650 LF of exfiltration trench,milling&resurfacing of S.W.272nd Street,a driveway connection permit for a new driveway abutting US-1,site grading, • fire and domestic water services. The project also included obtaining permits from FDOT District • 6, Miami-Dade County Building Department, DERM and acquisition of an Environmental Resource • Permit (ERP) from the South Florida Water Management District. • Altos de Cuervo Master Plan,Tequila,Jalisco,Mexico-Senior Civil Engineer. Master Plan of an 850- • acre Greenfield site proposing the development of an 18-hole golf course, an equestrian center, • single family home, and tourism oriented facilities. Responsible for all civil engineering design and • development of construction documents for the Demolition of existing facilities; Modification to traffic flow patterns; Relocation of existing utilities; water supply & distribution; sewer collection; • stormwater collection; road & parking lot layouts; paving, grading,and drainage for paved areas • including sidewalks & pedestrian pathways; permitting with regulatory agencies; Services during • project bidding,award,&construction;and Final certification to regulatory agencies. • Harbison New Town Mixed Use Master Plan-HUD New Town Project3000 AC,Master Plan. Engineer • Design and construction of water sewer stormwater facilities. • • FEMA-DERM Drainage and Roadway Improvement Program Designs,FEMA and Miami-Dade County, Florida-Managed the improved stormwater drainage and roadway reconstruction design following • a series of unclassified storms that damaged the roadway infrastructure in unincorporated Miami- • Dade County. The project was co-founded by FEMA and the County. • College Road Enhancements, Key West, Florida - Senior Project Engineer for the infrastructure • improvements to 0.6 miles along College Road. Enhancements include construction of sidewalks, • storm water system modifications, and improvements to bus stops. Responsible for the design of • water,sewer,and drainage system as well as pavement.and permitting. • Cba > www.bermelloajamil.com • 47 • • • • • • • • • _ Jack P. Young, P.E. • Senior Project Manager • • University of Miami, Roadway Improvements, Coral Gables, Florida-Lead Project Manager for the • redesign of four Coral Gables streets: Scodello, Corniche. Albenga and Liguria Avenues. Project included canalizations and turn lanes off San Amaro Drive onto Brescia and Albenga Avenues. • Conduits were provided for future signalization of the turn lane intersections. Redesign included the • removal of existing asphalt roadways and driveways,the substantial grading of the base material to • provide sufficient slopes to accommodate a new storm drainage system, widening of travel lanes to 10 feet each way, providing a common drainage swale for the new pavement and landscaped • area (15 feet wide), regrading of the landscaped area to drain toward the roadway without • disturbing existing trees and paving marking and signoge. Miami-Dade Fire Rescue Department (MDFRD) Fire Station Design/Build Contracts. Homestead, • Florida - Lead Project Engineer working on two (2) simultaneous design-build site development • projects; the MDFRD Projects are: Village of Homestead Fire Station (No. 66) and East Homestead • Fire Station (No. 65). Mr. Young provided civil design, project coordination between contractor, • architect and other engineering disciplines, as well as provided client assistance with permitting within Miami-Dade County. • • Parrot Jungle Island Artificial Wetlands. Watson Island. Florida - Managed civil engineering for the • development of an artificial wetland at the heart of the Miami area tropical wildlife tourist attraction. Parrot Jungle Island.The 18-acre Parrot Jungle facility is home to thousands of tropical birds such as • yellow Amazon parrots and pink flamingos,crocodiles,snakes and orangutans and more than 2,000 • varieties of plants and flowers.The artificial wetland mimics on Everglades environment. Managed • the water, sewer, storm drainage and grade development master planning to create the artificial • wetlands and provided all environmental permitting. • Williams Island Seawall Rehabilitation. Aventura, Florida-Project Manager and Engineer of Record • for the addition of a new steel-piling seawall that retained the existing concrete pile/panel seawall • and tied the two walls together with a new concrete cop. • Fisher Island Northern Seawall Rehabilitation, Miami. Florida - Project Manager and Engineer of • Record for the addition of a sheet-piling toe-wall waterward of an existing concrete pile/panel • seawall. This design prevented undermining of material beneath the existing panels, therefore • preventing soil settlement landward of the seawall. • Port of Miami Cruise Terminals D & E, Miami, Florida - Senior Civil Engineer. Repairs, upgrades and • new construction for Cruise Terminals 'D' and 'E'. This project is a fast track project. Responsible • for all civil engineering design and development of construction documents for the Demolition of existing facilities; Modification to traffic flow patterns; Relocation of existing utilities;water supply & • distribution; sewer collection; stormwoter collection; road & parking lot layouts; paving, grading. • and drainage for paved areas including sidewalks & pedestrian pathways; permitting with • regulatory agencies; Services during project bidding,award, &construction;and Final certification • to regulatory agencies. • Community Development Block Grants,Homestead,Florida-The projects required planning,design, • permitting and construction administrative services for the extension of water distribution, sanitary • sewer collection and transmission (including pump stations with force mains),paving and drainage • systems to 310 acres of unserved areas of the city. • • • • • • Cba > www.bermelloajarnil.com • 48 • • • • • • • • • _ Nobel Valencia, P.E. • Civil Engineer • • Professional Design Experience • Nobel Valencia is a Florida-registered Professional Engineer with over 18 years of experience in Civil Engineering. His experience includes the design, planning, and permitting of various projects • 1 for commercial, residential, transportation, education, and municipal sectors as well as providing • , engineering consultant services for the Miami International Airport and PortMiami. • _ • z I PROJECT EXPERIENCE • --{ `c / Parking Facility,Homestead C RA,Homestead,Florida-Civil Engineer.Providing civil engineering design • . , and development of construction documents for the demolition of existing facilities;Project includes • the modification for traffic flow patterns; relocation of existing utilities; water supply & distribution; sewer collection;stormwater collection;road&parking lot layouts;paving,grading,and drainage for • paved areas including sidewalks & pedestrian pathways; permitting with regulatory agencies. B&A • services include bidding,award,&construction;and final certification to regulatory agencies. • EDUCATION 4th Street Streetscape,Homestead,Florida-Civil Engineer.Responsible for all civil engineering design • Bachelors of Science in Civil and development of construction documents for the Demolition of existing facilities; Modification • Engineering,e Santo antto traffic flow patterns; Relocation of existing utilities:water supply & distribution; sewer collection; Avtdnoma de SDomingo o • (U.A.S.D.).Dominican Republic, stormwater collection; road & parking layouts; paving, grading, and drainage for paved areas • 1991 including sidewalks & pedestrian pathways; permitting with regulatory agencies; Services during project bidding,award, &construction;and final certification to regulatory agencies. • • PROFESSIONAL REGISTRATIONS Altos de Cuervo Master Plan, Tequila, Jalisco, Mexico - Civil Engineer. Master Plan of on 850- • Engineer.PPE. Stole of Florida7acre Greenfield site proposing the development of an 18-hole golf course, an equestrian center E.No..N 72193 Professional single family home, and tourism oriented facilities. Responsible for all civil engineering design and • development of construction documents for the demolition of existing facilities; modification for • traffic flow patterns; relocation of existing utilities; water supply & distribution; sewer collection; • stormwater collection;rood & parking lot layouts; paving,grading, and drainage for paved areas • including sidewalks & pedestrian pathways; permitting with regulatory agencies; Services during project bidding,award. &construction;and final certification to regulatory agencies. • • Mercy Hospital Parking Lot Improvements, Miami, Florida - Civil Engineer. Provided site planning, • drainage,water and sewer design and construction management.Project included the design of a • freestanding five-story parking garage accommodating 786 parking spaces. • City of Miami Community Redevelopment Agency(CRA),Miami,Florida-Civil Engineer.As general • consultants to the City of Miami's Community Redevelopment Agency (CRA), B&A provided a • variety of services for numerous projects. Mr.Valencia provided site planning and drainage design for the development of parking lots. • • NW 97th Avenue Milling and Resurfacing, Miami-Dade County Public Works, Miami, Florida - Civil • Engineer.Provided drainage design for this four lone roadway extension. • Calais Drive Street,Miami Beach,Florida-Civil Engineer.Provided roadway design and improvements • for 1.700 ft.of roadway in Miami Beach. • Bill Boggs Recreation Park,Miami,Florida-Civil Engineer for the design of 1.200 ft of access rood and • 2,800 ft.bike path design. • • Miami International Airport,Miami Florida-Civil Engineer.Provided general construction site inspections. • Port of Miami, Roadways,Miami, Florida-Civil Engineer.Paving and signing of all roads at the Port. • • Port of Miami,Terminals 8/9,Miami, Florida-Civil Engineer.Site work,additions and utilities relocation. • Cba > www.bermelloajamil.com • 49 • • • • • • • • Nobel Valencia, P.E. • Civil Engineer • • Port of Miami, Shed B, Miami, Florida - Civil Engineer for the paving and drainage of Shed B which • was 38 acres. • Port of Miami. New Caribbean Way. Miami, Florida - Civil Engineer for a 4-lane 1.500 ft. roadway • design. • Miami International Airport, New "Concourse "J". Miami, Florida - Civil Engineer. Provided site • planning,drainage,water and sewer and utilities design. • • Miami International Airport,Satellite"E"Expansion,Miami,Florida- Provided site planning,drainage. • water and sewer and utilities design. • Tamiami Airport,Jet Center Executive.Miami, Florida-Civil Engineer.General site work design. • • Miami-Dade County Public Schools,Miami,Florida-Civil Engineer.Provided site work improvements. water,sewer,utilities and drainage plans. • • Four Seasons Hotel 8 Tower, Miami, Florida - Civil Engineer. Provided site planning, drainage, • water and sewer design and construction field inspections for this 70-story high rise hotel, office • and condominium. The project incorporated 'A mile of sanitary sewer reconstnrcfion, 'h mile of watermain extension,on-site paving,grading and drainage with stormwoter retention. • • Marriott"Villas at Doral".Doral,Florida-Civil Engineer.Project included the design of a 240 unit time • share resort on a 12.58 acre property. Mr. Valencia provided site planning, drainage, water and sewer design and construction management. • • Beacon Center Office Building,Miami,Florida-Civil Engineer.Provided site and drainage design and • site improvements for a 200-acre industrial/commercial development.Site development included earthwork, water transmission mains, water distribution, fire protection, sanitary sewers systems. • stormwa ter drainage,and grading and paving for roadways,parking lots and truck aprons. • • Bellagio Isles, Miami, Florida - Civil Engineer for the site development study for this 535 acre site • located in Northwest Miami-Dade County. • Comfort-Inn and Clarion Hotels, Miami Springs, Florida - Civil Engineer for the utility improvements • including water,sewer and drainage. • Mall of the Americas Parking Lot Drainage Improvements, Miami, Florida - Civil Engineer for the • drainage improvements to the parking lot as well as demolition of existing restaurant. • • OTHER PROJECT EXPERIENCE Port of Miami.General Consultants.Miami. Florida • Miami-Dade County Aviation Department.General Consultants,Miami,Florida • Miami International Airport. North Side Drainage Study,Miami,Florida • MDWASD Regional Pump Station Design,Miami-Dade County,Florida • Roadway&MOT Plans for Miami-Dade County.Miami,Florida Marpi Single Family Homes.Miami Florida • Coral Reef Single Family Homes,Miami,Florida • Vista al Logo Apartments.Miami,Florida • Pioneer Village Homes, Homestead. Florida • • • • ca D www.bermelloajamil.com • 50 • • 0 0 • • • • • Gerardo Dragoni • Civil Engineering Designer / Senior CADD Technician • • Professional Design Experience Gerardo Dragoni is a civil engineering design and senior CADD Technician with over 20 years of • experience.He is responsible for assisting in the development of highway plans using Micro Station • `. '-- V8 and AutoCAD and creating projects using electronic delivery. He has also performed traffic k • counts and compiled data for use in performing traffic analyses. His experience includes creating • ' ' profiles, typical sections, preparing cost estimates. Mr. Dragoni is an expert in Florida Department `.a - of Transportation (FDOT) and Miami-Dade Public Works plan development practices. • �J • 'p` / ! ��, RELEVANT PROJECT EXPERIENCE • „� - N - Parking Facility for the Homestead CRA,Homestead,Florida-Civil Engineering Designer.Responsible • for all civil engineering design and development of construction documents for the demolition of existing facilities; modification to traffic flow patterns; relocation of existing utilities;water supply & • distribution;sewer collection;stormwater collection; road&parking lot layouts;paving,grading,and • drainage for paved areas including sidewalks & pedestrian pathways; permitting with regulatory agencies;Services during project bidding,award,&construction;and final certification to regulatory • EDUCATION agencies. • Bachelor of Science in Civil HolEngguin, Cu, ,University1994 4th of 4th Sheet Improvements, Homestead CRA, Florida - Civil Engineering Designer. Responsible for • Holguin,Cuba, 199a • all civil engineering design and development of construction documents for the demolition of • existing facilities; modification to traffic flow patterns; relocation of existing utilities;water supply & distribution;sewer collection; stormwater collection; road & parking layouts; paving,grading,and • drainage for paved areas including sidewalks & pedestrian pathways; permitting with regulatory • agencies;Services during project bidding,award,&construction;and final certification to regulatory • agencies. • FDOT District 6,Normandy Drive(SR-934)from NE 71st Street to Rue Notre Dame,Normandy Isle,Miami • Beach, Florida -Senior CADD Technician. Resurfacing, Restoration and Rehabilitation of Normandy • Drive beginning at Rue Notre Dame and continuing for approximately 0.31 miles to N.E. 71st Street. ® Primary responsibility included the production of project set of Signing and Pavement Marking. • 127th Avenue from SW 6th Sheet to NW 12th Sheet,Beacon Lakes Community Development District/ • Miami-Dade County Public Works Department, Miami, Florida - Senior CADD Technician. Project • entailed the reconstruction of 127th Avenue from a two-lane roadway to a four-lane roadway with a shared-use median between SW 6th Street and NW 6th Street and a divided median between NW • 6th Street and NW 12th Street. Primary responsibilities included drainage design,including tabulation • of summary of drainage structure,production of project set of Signing and Pavement Marking.utility • adjustments and roadway reconstruction. • FDOT District 6, NW 74th Sheet from NW 87th Avenue to NW 84th Avenue, Miami, Florida - Senior • CADD Technician. Project consisted of the reconstruction of approximately 0.6 miles of an existing • unpaved road to a proposed 4-lane corridor with a scramble lane.Reconstruction includes NW 87th • Avenue.Responsible for the development of project set of Signing & Pavement Marking. • FDOT District 6, SR 94/SW 88 ST/Kendall Drive, from south of 98 Court to north of 99 Court, Miami, • Florida - Senior CADD Technician. Resurfacing and widening of a 4 lane major urban roadway. • Primary responsibilities included production of project set of Signing and Pavement Marking. • Beacon Lakes Community Development District/Miami-Dade County Public Works Department, • Miami-Dade County, Florida - Project entailed lighting and signal design. Primary responsibilities • included plans preparation of lighting and signal designs as well as tabulation of quantities for • project materials. • SW 136th Street from 139th Court to SW 152nd Avenue,Miami-Dade County Public Works Department, • Florida - Project entailed widening/reconstruction of an urban arterial from an existing 2-lane • Cba > www.bermelloajamil.com • 51 • • • 0 O O O O Gerardo Dragoni • Civil Engineering Designer / Senior CADD Technician I • rural road to a four-lane section with a shared-use median, curb & gutter, and sidewalk. Primary • responsibilities included production of project set of Signing and Pavement Marking. • SW 268/264 Sheet Connector, Miami-Dade County Public Works Department, Florida - Project consisted of the improvements to SW 268th Street from a 4-lane undivided section to o 5-lane section • from SW 142nd Avenue to SW 122nd Avenue with a two-way left turn lone and a 4-lane divided section with a median separator from SW 122nd Avenue to SW 112th Avenue.Primary responsibility • included the production of project set of Signing and Pavement Marking. • • FDOT District 6, SR-823 (Red Road), Miami, Florida - Drainage design of 2.1 Miles of Roadway. • Drainage services includes hydrology and hydraulic calculations;water quality and water quantity permitting calculations;and pre-development and post-development drainage modeling;as well • as environmental permitting through DERM and SFWMD for 2.1 miles of Bird Road canal drainage. • As a land surveyor. Mr. Dragoni supervised, trained and assisted the field crew for data collection • (TOPO)on several side streets emptying out to NW 57th Avenue. As a Cadd Technician his primary • responsibilities included partial of drainage design in the pre and post-development. • 72"RWM,Miami.Florida-Mr.Dragoni served as the Senior Design responsible for assisting in the preparation • of Site plan.Paving,Grading and Drainage Water and Sanitary Sewer collection system.utilities collection, • Opinion Cost Estimates.Create setup for the project,Drainage Structures and Profiles. • 36 Inch Reuse Water, Miami, Florida - Senior Designer responsible for assisting in the preparation of • Construction Estimates.Aerial Pictures using Descartes,Create profiles,Typical Sections. • Proposed 42-inch Water Line along Candle shade, Jorns,and W. Orem in Houston,Texas- Assisted • with the design. which included plan and profile of proposed waterline, standard details, notes, • calculations.etc.A combination of AutoCAD 2006 and MicroStation V8 was used for this project. • Cover Ranch.George Park,North Broward,Tradewood,CB Smith,Markham,Osswald Park,Broward • County, Florida- Engineering Technician. Responsible for assisting in the CADD production of Plan. • Prepared Utility Adjustment sheet, Profiles for sewer and water, prepared the plans and Pavement • and Grading plans. • Pod of Miami Cruise Terminals D & E, Miami, Florida -Civil Engineering Designer. Repairs, upgrades • and new construction for Cruise Terminals 'D'and 'E'.This project is a fast track project.Responsible • for all civil engineering design and development of construction documents for the demolition of • existing facilities; modification to traffic flow patterns; relocation of existing utilities; water supply & distribution;sewer collection;stormwater collection; road&parking lot layouts;paving,grading,and • drainage for paved areas including sidewalks & pedestrian pathways; permitting with regulatory agencies;Services during project bidding,award,&construction;and final certification to regulatory • agencies. • Altos de Cuervo Master Plan, Tequila, Jalisco, Mexico - Civil Engineering Designer. Master Plan of an 850-acre Greenfield site proposing the development of an 18-hole golf course, an equestrian • center,single family home,and tourism oriented facilities.Responsible for all civil engineering design • and development of construction documents for the demolition of existing facilities; modification • to traffic flow patterns; relocation of existing utilities; water supply & distribution; sewer collection; stormwater collection; road & parking lot layouts;paving,grading,and drainage for paved areas including sidewalks & pedestrian pathways; permitting with regulatory agencies; Services during • project bidding,award,&construction;and final certification to regulatory agencies. I I S Cba > www.bermelloajamil.com • 52 • • O O 0 0 O • Francisco J. Tejidor, P.E. • Senior Associate, Geotechnical Engineer • O Professional Design Experience OFrank Tejidor hos more than 28 years of experience in geotechnical and civil engineering. He served v' _y for more than 10 years as the District Geotechnical Engineer for Florida's Turnpike. He was responsible • J .3- for the design management of the entire geotechnical program for the Turnpike District and the f' r supervision of construction related issues. Previously,he was lead technical professional for bridge and • T- 1' roadway design in the Program Management of the Orlando-Orange County Expressway Authority • WJ' and the Palmetto Expressway Improvement Program. Additionally, he has been involved in projects with foundation underpinning of historic and multi-story buildings. installation monitoring of in-situ • �l testing of pressure injected tiebacks.design of belled drilled shafts over deep compressible material, • instrumented pile load test,and construction monitoring and field testing of a multi-story slurry wall. • RELEVANT PROJECT EXPERIENCE • SR 874 Roadway Improvements, Miami-Dade Expressway Authority (MDX), Miami, Florida - QA/ • QC Geotechnical Engineer for the widening of the Don Shula Expressway. Geotechnical design management and construction supervision for project retaining walls, noise walls, roadway • EDUCATION widening,and bridge foundations. As lead technical professional,responsible for the management • Master of Science in Civil and supervision of the geotechnical program for MDX. Responsibilities include the technical review Engineering-Geotechnical • Engineering.Purdue University, and approval of all geotechnical explorations and design recommendations. • 1984 Central Boulevard,Miami-Dade Expressway Authority(MDX),Miami,Florida-QA/QC Geotechnical • Bachelor of Science in Civil Engineer for the improvements to the entrance to the Miami International Aiprort. Geotechnical • Engineering,University of design management and construction supervision for project retaining walls,noise walls,roadway • Miami, 1979 widening,and bridge foundations. As lead technical professional,responsible for the management • and supervision of the geotechnical program for MDX. Responsibilities include the technical review REGISTRATION and approval of all geotechnical explorations and design recommendations. • Professional Engineer. • State of Florida-No.38847 Design-Build of the MIA Mover Automated Train System, Miami-Dade Aviation Deportment, • Florida - Lead Technical Professional for geotechnical engineering services on this $259 million Professional Engineer, design-build project with responsibilities to ensure that design-build contractor complies with the • State of North Carolina foundation and geotechnical related contract requirements as well as MDAD's standards and • Professional Engineer, project approved plans and specifications. Responsibilities included plans review,design support. • State of South Carolina on-site construction support,and oversight review of RFI's and shop drawings. • Professional Engineer, SR 836 Expressway Extension,Miami-Dade Expressway Authority(MDX),Miami,Florida-Geotechnical • State of Alaska Engineer for the extension of the primary East/west Expressway system of Dade County. Florida. • Geotechnical design management and supervision for project retaining walls,high fill embankments, roadway improvements, and bridge foundations. As lead technical professional, responsible for • PROFESSIONAL AFFILIATIONS the management and supervision of the geotechnical program for MDX. Responsibilities included • International Society of Soil Mechanics and Foundation the development of the scope of work, negotiation of subconsultant contracts,and the technical • Engineering review and approval of all geotechnical explorations and design recommendations. • American Society of Civil SR 826/SR 836 Expressway Widening, Miami-Dade Expressway Authority (MDX), Miami, Florida - • Engineers Geotechnical Engineer.Project involved the design and construction monitoring of a soil stabilization • Deep Foundations Institute system based on MDX design/build guidelines. The purpose of the soil stabilization system was to • serve os a transfer mechanism for the bearing support of high fill embankments and retaining walls • Notional Society of Professional over weak subsurface soils. The soil stabilization system included a load transfer platform consisting • Engineers of high strength geogrids and in-situ concrete displacement piles. Responsibilities included the review and approval of design documentation, shop drawings, establishment of field testing • criteria for load tests.construction monitoring,and approval of final product. • Walt Disney World, Bridge Inspection Program, Orlando, Florida - Directed and supervised the • bridge inspection program for the entire Disney World complex. The work included review of • existing record drawings and performing load ratings on selected bridges. A wide selection of • bridge types were inspected,including pedestrian bridges. • Cba D www.bermelloajomil.com • 53 • • • 0 0 0 0 • • Francisco J. Tejidor, P.E. • Senior Associate, Geotechnical Engineer • • Orlando-Orange County Expressway Authority,Program Management,Orlando,Florida-Directed • and supervised the design reviews of expressway structures(bridges,retaining walls,culverts,etc.). developed structures design criteria, and technical resolution of issues with section designers and • subconsultants. • • Public Boat Ramps Engineering Project for the Florida Keys,Monroe County,Florida-Project Engineer. Engineering design services for the repair and upgrades to six public boat ramp facilities in the Florida • Keys.All of the boat ramps were showing disrepair,and many did not meet current design standards • and criteria.Project included civil and structural engineering services,land surveying,geotechnical • work,and environmental permits for the six boat ramps.The structural design of the ramps and the • adjoining seawalls,and mooring facilities were design and permitted by Mr.Tejidor's team. • Key Haven/SR 5 Seawall and Boat Ramp, Monroe County, Florida - Project Manager for reconstruction of the boat ramp and associated access improvement on State Road 5/Overseas • Highway. The reconstruction included a new concrete boat ramp, a bulkhead wall designed to resist erosion from consistent and repeatedly heavy wave action caused by a hurricane event. • and a cantilevered retaining wall adjacent to US-l. • • Port Everglades Master Plan, Fort Lauderdale, Florida - Marine Engineer. Project encompassed all architectural and marine structural engineering works.Effort was the first of its kind for a public seaport in • ifs comprehensiveness as well as technologies and operations and command functions established. • • Miami Beach Seawall, Miami Beach, Florida - Project Manager. Responsible for the design of the • replacement of a deteriorating concrete seawall.The current seawall was in severe disrepair and required total replacement. Provided full marine civil engineering services for a new cantilever • steel sheet pile seawall in 30 ft. of water.The new seawall was designed to be located within the • existing seawall footprint. • Miami Circle Seawall Replacement,Miami,Florida-Project Manager.Responsible for the design of • the replacement of a deteriorating concrete seawall. The current seawall was in severe disrepair • and required total replacement.Provided full marine civil engineering services for a new cantilever • steel sheet pile seawall in 15 ft.of water.The new seawall was designed to be located within the • existing seawall footprint. • Harbourside Marina&Seawall,Jupiter-Florida-Marine Engineer.Marina and waterfront development. • The marina design integrates with the masterplan concept of an urban destination for both residential • entertainment activities. Since the marina is situated in a very sensitive ecological environment, extensive efforts were made to minimize impacts to the environment while simultaneously focusing • on functionality. Substantial reductions in the scope of the marina were made in order to comply • with the requests of the regulatory agencies. • • • • • • • • • • • • Cba > www.bermelloajamil.com • 54 • • • • • • • • Carlos Bonzon, Ph.D, P.E. • Director of Infrastructure and Municipal Services, Partner • • Professional Design Experience • Dr. Bonzon has over 40 years of experience in program and construction management of complex capital improvement programs including extensive experience in managing multidisciplinary A/E • I teams.Dr. Bonzon retired from Miami-Dade County in 2006 as an Assistant County Manager.During • \ J his 35 year tenure with the County he also served as Miami International Airport(MIA)Director and as • n _ Deputy Aviation Director in charge of its multi-billion dollar Capital Improvement Program(CIP). • `, RELEVANT PROJECT EXPERIENCE • ` I Miami-Dade Aviation Department, Design-Build MIA Mover Automated Train System - Project • /y Manager for the Construction Services Team.B&A is acting as MDAD's representative in overseeing • the fixed-facilities design and construction activities of this $259 million design-build project. Under Dr. Bonzon's leadership, B&A is providing CE&I services and is responsible for ensuring that the • design-build contractor complies with the contract requirements,MDAD's construction and design • guidelines as well as MDAD's standards and the project approved plans and specifications. The B&A Team is providing plans review, design support, office engineering, on-site quality assurance • EDUCATION inspection services, contract administration, construction safety monitoring, invoices/requisitions/ • University of Florida.Ph.D. contractor pay requests review,and oversight review of RFIs and shop drawings.The B&A Team will Engineering, 1969 • also provide support services during the testing, commissioning and close-out phases.The project • University of Florida,M.S. fixed-facilities will be substantially complete later this year. • Mechanical Engineering, 1967 Miami-Dade County Surface Transportation Manager - Dr. Bonzon was responsible for overseeing • University of Florida, B.S. Miami-Dade County's major transportation programs and capital development portfolio including • Mechanical Engineering, 1966 the following departments: Transit. Public Works, Office of Capital Improvements,Seaport and the • REGISTRATION Metropolitan Planning Organization (MPO). Some of the significant projects conducted under Dr. • PE Florida No. 16742 Bonzon's direction and oversight were as follows: • General Engineering • Miami Intermodal Center (MIC)-Eadington Heights Metrorail Connector- • Contractor-Miami Project Implementation/Final Design Dade County • Port of Miami Tunnel-County's Lead Representative • • Metrorail North Line Extension-FEIS/Preliminary Engineering • • Metrorail East/West Extension-Planning/Preliminary Engineering • • Major highway and road improvements including a complete upgrade of • the County's traffic signalization system. • Miami International Airport Interim Aviation Director - Dr. Bonzon was responsible for managing • the day-to-day operation of Miami International Airport (MIA) and four General Airports. He was • in charge of the management of terminal, airside and landside operations, aviation engineering, facilities development, business development, financial management and safety and security. As • MIA Aviation Director Dr.Bonzon: • • • Supervised the preparation of the MIA Mover DBOM Request for Proposal • Documents(RFP)and approved its issuance in 2004 • Led negotiation with American Airlines (AA) for the County to take over the • Construction Management of the North Terminal and for AA to pay the Aviation • Department$105 million towards the settlement of construction claims • Miami International Airport Capital Improvement Program - Responsible for the overall direction, • planning and management of the design and construction of MIA's $5.4 billion capital expansion • program,one of the world's largest and most ambitious expansion and redevelopment programs of • a functioning airport. Some of the key projects that Dr.Bonzon was in charge of are as follows: • • Planning and development of the MIA Mover project,an automated People Mover connecting MIA to the MIC • • New 8,600 feet runway along with associated utility corridors and drainage projects • • Terminal and Concourse programs to increase MIA's Terminal building from 43 million to 7.1 million • Cba square feet • > www.bermelloajamil.com 55 • • • • • • • • Carlos Bonzon, Ph.D, P.E. • Director of Infrastructure and Municipal Services, Partner • • • New linear North Terminal with 48 international gates,3,600 passengers per hour Federal • Inspection Facility(FIS)and the ability to handle 250 flights per day including an Automated People Mover with four stations • • New South Terminal which is capable of providing a secondary hub,a new 2.000 passengers per • hour Federal Inspection Facility(FIS) and a new Concourse J with 15 gates • • Midfield Taxiways Improvements:Pavement strengthening of the three existing runways • New Central Collection Plaza with 22 lanes. • • Miami-Dade Transit-Director of Engineering and Construction Management—Assumed responsibility • for the direction,planning and management of all design,engineering, construction management • and contract administration of the following significant projects: • • A 20.5 mile elevated Metrorail system with 20 passenger stations,parking garages and • maintenance facility for 136 transit vehicles • • A 1.9 mile elevated design-build Automated Peoplemover System(Metromover)in downtown Miami with elevated stations and a maintenance facility for 12 peoplemover vehicles • • Planning and design of the Metromover Nickell and Omni legs extensions in downtown Miami • • Design and construction of Miami-Dade transit bus maintenance facilities • Miami-Dade Transit Deputy Director— Dr. Bonzon was responsible for directing the daily operation • and maintenance of the Metrorail, Metrobus and Metromover transit systems, which carried in • excess of 260,000 riders daily with an annual budget of over$160 million. • • Miami-Dade County Building and Zoning Director—Dr. Bonzon was responsible for the enforcement of applicable code requirements for building, zoning, minimum housing and tensed contractors. In • charge of the review and processing of building plans to assure compliance with the South Florida • Building Code prior to issuance of building permits. • Miami-Dade County Public Works Assistant Director—Responsible for the management,planning and • contract administration of all engineering and construction associated with transit capital projects. • • Miami-Dade County Manager of Design and Engineering—Directed a multi-discipline in-house staff of • architecture and engineering design consultants involved in the final engineering activities for all work associated with the Metrorail project and Metrobus bus maintenance toadies. Design of stations, • maintenance facaities.parking lots,parking garages and landscaping;Design of bridges,tracks and • roadbeds:System and equipment contracts:Engineering support during construction of facilities. • AWARDS/RECOGNITION • "Outstanding Service to the Engineering Profession" • (Florida Engineering Society Miami Chapter 2005) • "The Francisco Albear Lifetime Achievement" • (Cuban-American Association of Civil Engineers 2005) • • "Outstanding Contributions to the Construction Industry and the South Florida Building Code" • (South Florida Building Officials Council 1993) • "The Newsmaker"-Miami Today 2004 • • "Carlos F. Bonzon Day"Proclamation-Miami-Dade County Office of the Mayor and Board of • County Commissioners-December,2006 • Award of Excellence"-County Manager,2005 • • Cba > www.bermellocjamil.com • 56 • • O 0 O 0 O 0 Aurelio Matos, P.E. • Director of Construction Services/Senior Project Engineer 0 • . Professional Experience • Mr. Aurelio Matos, P.E.. has over 25 years of experience in the Transportation Engineering field, / specializing in project management, construction engineering, inspection and management • .e.. 0 (CEI&M),as well as minor transportation engineering design. Mr.Matos has worked on several multi- • j{!l e L million dollar roadway, bridge.and utility projects,completing close-out packages for construction • V igty.+-� projects since 1985. He is a recipient of the 1999 FDOT/FTBA Rural Construction Award for his work "'•�` -, / on the SW 137th Avenue (Tallahassee Road/Speedway Blvd) construction project and recipient of • s `11 the 2002 FDOT/FTBA Major Interchange Award for his work on the SR 826/NW 58th Street Interchange • y_ ` ".�`/, , , project,both in Miami-Dade County. • OIS1.��S. • PROJECT EXPERIENCE BERMELLO AJAMIL S. PARTNERS,INC.,MIAMI,FLORIDA • Director of Construction Services/Senior Project Engineer. Director of Construction Services directly • responsible for running the daily operations of the Construction Engineering&Inspection(CEI)Services • EDUCATION Division of the firm. In addition. Senior Project Engineer responsible for overseeing the construction • Bachelor of Science in Civil engineering operations, administration, management, and quality control of construction projects Engineering.New Jersey in South Florida. • Institute of Technology, 1987 • Currently responsible for the CEI Oversight services on the MDX 87409 Design-Build project, SR 874 Post-Graduate Studies in Mainline Widening from Kendall Drive to the Palmetto Expressway (SR 826). with the Design-Build • Construction Engineering & team of Community Asphalt Corp. /C3TS Engineers. (FDOT Category: 10.1, 10.3, 10.4). Duration: • Management, New Jersey 09/2010-Present. Cost: $46M. Contact:MDX Contact Person-Juan Toledo,PE,Assistant Director Institute of Technology. 1989 • of Engineering and Construction.305.637.3277 • REGISTRATIONS COMMUNITY ASPHALT CORP.,MIAMI, FLORIDA • Professional Engineer,Florida, Miami-Dade Expressway Authority (MDX) Design/Build for the Central Boulevard Realignment, • P.E.No.71701 Widening, and Service Ramps at the entrance to the Miami International Airport (MIA) Terminals. • Professional Engineer,New Miami,Florida(FDOT Category: 10.1,10.3, 10.4)-Senior Project Manager/QC Manager. This project • Jersey,P.E.No.24GE043298 consists of the construction of three (3) new AASHTO concrete beam bridges and widening of three (3) existing bridges along Central Boulevard. Complete reconstruction of Central Boulevard • Professional Engineer.Texas. (main artery into and out of MIA), NW 20th Street, McLaughlin Drive. and the North Service Road. • P.E.No.96291 Construction of NW 42nd Court,from NW 18th Street to McLaughlin Drive,including a new single-span steel girder bridge over the SFWMD C-4 Canal. Duration:05/2010-09/2010. Cost: $42M. Contact: • Professional Engineer,Georgia. CAC Contact Person-Ignacio Halley, PE, President,305.829.0700 • P.E.No. PE031003 • Professional Engineer. FDOT District 6,Design/Build PPP Project for the Reconstruction of SR-5(US-1),from MP 3.560(SFWMD • Alabama,P.E.No.31391-E C-111 Canal)to SW 344th Street(Palm Drive)(9 miles),Florida City,Florida(FDOT Category:10.1,10.3, 10.5.1) -Senior Project Manager/ OC Manager. Reconstruction of 9 miles of US-1, which includes • Professional Engineer,New clearing and grubbing, demucking. embankment, drainage, limerock/asphalt base, asphalt York,P.E.No.088734-1 • pavement, median concrete barrier wall, lighting, signalization, AT&T ducfbank, and a three-span • AASHTO concrete beam bridge over the SFWMD C-111 Canal and two (2) single span flat slab • AFFILIATIONS animal crossing bridges with MSE walls. Duration: 03/2008-09/2010. Cost: $110M. Contact:CAC American Concrete Institute Contact Person-Ignacio Halley,PE, President.305.829.0700 • (ACI),Member ri 124625 • FDOT District 4, SR 823 (Red Road). from Miami-Dade/Broward County Line to south of Pembroke American Soc(ASCE), of Civil Rood(3 miles).Miramar,Florida(FDOT Category:10.1,10.3 Senior Project Manager/QC Manager. • Engineers(ASCE),Member= ) gig ) 1 g g • 206590 This project consisted of drainage, lighting, signalization, sidewalk, and milling and resurfacing of existing pavement. Duration:02/2009- 12/2009. Cost:$5M. Contact:CAC Contact Person-Ignacio • Construction Management Halley,PE,President,305.829.0700 • Association of America • (CMAA),Member=08240 FDOT District 4,Griffin Rd(SR 818)Reconstruction and New Bridge Over the C-11 Canal,from Volunteer Florida Engineering Society Rd to Flamingo Rd (3 miles), Southwest Ranches, Florida (FDOT Category: 10.1. 10.3, 10.4) - Senior • Project Manager/OC Manager. Complete roadway reconstruction including drainage,earthwork, (FES).Member # 9001220 • base. curb & gutter, sidewalk,asphalt pavement, decorative lighting, signalization, guardrail, and • Cba > www.bermelloajamil.com • 57 • • • • • O O •O _ Aurelio Matos, P.E. • Director of Construction Services/Senior Project Engineer • • construction of a new three-span flat slab bridge spanning the SFWMD C-11 Canal. Foundation • was on 18"x18"concrete piles with EDC's. Duration:07/2008- 12/2009. Cost:$17M. Contact:CAC Contact Person-Ignacio Halley,PE,President,305.829.0700 • • Florida's Turnpike Enterprise, Design/Build for the SUNPASS Lanes Conversion to Open Road Tolling • (ORT) on Florida's Turnpike at the Bird Road and Homestead Toll Plazas, Miami, Florida (FDOT Category: 10.1, 10.3)- Senior Project Manager/DC Manager. These two projects were design and • constructed within 6 months. Conversion of the existing Toll Plazas SUNPASS lanes to High Speed • Open Road Tolling SUNPASS lanes.Duration:08/2007-02/2008. Cost:$13M. Contact:CAC Contact • Person-Ignacio Halley,PE,President,305.829.0700 • THE DEMOYA GROUP,MIAMI,FLORIDA • FDOT District 4,Andrews Avenue Extension,from Atlantic Blvd.to North of Hammondville Rd.,Pompano • Beach, Florida (FDOT Category: 10.1. 10.3. 10.5.2) - Project Manager/ OC Manager. Construction • of an extension of Andrews Avenue through virgin land. Work included drainage.earthwork,base, curb& gutter,sidewalk, asphalt pavement,lighting,signalization,guardrail,and a three-span steel • girder bridge with MSE walls over Hammondville Road and CSXT railroad tracks. Foundation was on • 18"x18" concrete piles. Duration: 06/2006 -07/2007. Cost: $29M. Contact: DMG Contact Person • -A.J.de Moya.President,305.498.2923 • A&P CONSTRUCTION TRANSPORTATION ENGINEERS,MIAMI, FLORIDA • Miami Intermodal Center's(MIC)Consolidated Rental Car Facility(RCF),Miami International Airport • (MIA),Miami,Florida(FDOT Category: 10.1, 10.3, 10.4)-Senior Project Manager for the construction • of this mega-project. Responsible for overseeing the construction engineering operations, administration, management. and quality control of the Miami Intermodol Center's (MIC) • Consolidated Rental Car Facility(RCF)structure foundations,Access Roadways and Bridges to/from • the RCF facility,MIA Mover Light Rail System (from MIA to the RCF) foundations,and Onsite&Offsite • Utilities. Supervised a staff of six people consisting of field inspection and administrative personnel, • plans and specifications interpretation, making field changes during construction due to changes in field conditions, evaluating value engineering change proposals. negotiating additional work • cost proposals,responding to request for information,tracking potential claims,approving materials • (soils, structural and reinforcing steel,concrete, and asphalt) being incorporated into the projects. ® and other contract administration duties. Duration:07/2003-04/2006. Cost:$300M.Contact:APCTE -Antonio G.Acosta. PE,President.305.219 4718 • • CONSUL-TECH ENGINEERING,MIAMI, FLORIDA • Widening of SR 826 Northbound and 1-75 Northbound Concrete Ramp,Miami,Florida(FDOT Category: 10.1, 10.3, 10.5.3)-Senior Project Engineer for this project which accommodates two lanes of traffic • with shoulders from the existing single lane. This is the first time in the mainland USA that a concrete • segmental bridge has been widened,according to the American Segmental Bridge Institute (ASBI). • The structure was post-tensioned prior to performing the widening work in order to stabilize the • structure. Temporary steel towers were erected at each existing pier in order to stabilize the structure during the widening work. Duration: 12/2002-7/2003. Cost:$6M.Contact:FDOT Contact Person-Ali • Al-Said,PE.District Six Permits Engineer,305.470.5100 • • SR 932 (NW 103rd Street / West 49th Skeet) from SR 25 (Okeechobee Road) to West 2nd Avenue, Hialeah, Florida(FDOT Category: 10.1, 10.3)-Senior Project Engineer for the signalization,pedestrian • ramp improvements and milling and resurfacing for 3 miles in the heart of the City of Hialeah. • Duration: 12/2002-07/2003. Cost: $3M. Contact: FDOT Contact Person -Ali Al-Said, PE, District Six • Permits Engineer,305.470.5100 • Reconstruction, Milling and Resurfacing of NW 27th Avenue, from Ali Baba Avenue to NW 135th • Street,Opa-Locka, Florida(FDOT Category: 10.1, 10.3)-Senior Project Engineer. Project included a • new drainage system,roadway reconstruction,new curb and gutter,sidewalk,lighting.signalization, • Cba > www.bermellocjamil.com • 58 • • • O 0 0 0 _ Aurelio Matos, P.E. • Director of Construction Services/Senior Project Engineer • • landscaping, pavement markings. signing, including overhead sign structures, and milling and resurfacing. Duration: 12/2002-07/2003.Cost:$3M.Contact:FOOT Contact Person-Ali Al-Said,PE. • District Six Permits Engineer.305.470.5100 • • Widening and Reconstruction of SR 860 (Miami Gardens Drive), from NW 57th Avenue to NW 28th • Avenue,Miami-Dade County,Florida(FDOT Category:10.1.10.3)-Senior Project Engineer.These were two different construction contracts with two different prime contractors and several subcontractors. • New drainage (french drain and close system) system under sandy conditions, construction of an • additional lane in each direction,new curb and gutter,sidewalk,lighting,signalization,landscaping, • pavement markings, signing, including overhead sign structures, and milling and resurfacing. Duration: 6/2001 - 12/2002.Cost:$12M.Contact:FDOT Contact Person-Saud Khan,District Six MOT • Engineer.305.470.5100 • • Widening and Reconstruction of SR 826 (Palmetto Expressway)/NW 58th Sheet,from NW 47th Street • to NW 62nd Street, Miami-Dade County, Florida (FDOT Category: 10.1, 10.3, 10.5.1)-Senior Project Engineer. The Palmetto Expressway was widened in each direction in order to accommodate • a High Occupancy Vehicle (HOV) lane. The job required channel excavation, muck removal. • realignment of the NW 58th Street Canal in order to construct the new southbound off-ramp, new • drainage system (french drain, close system, and trench drain along each side of the Palmetto), widening of the existing NW 58th Street bridge over the Palmetto,complete ramps(4)reconstruction, • concrete barrier walls,MSE walls,lighting,signalization,landscaping,superpave asphalt pavement, • pavement markings and signing.including several overhead sign structures. The canal realignment • was accomplished by installing triple 72"diameter RCP pipes under the Palmetto Expressway by the • microtunneling method and dual 108"diameter corrugated metal pipes under the new northbound on-ramp and southbound off-ramp. The microtunneling operation of these size pipes was the first • time that it was accomplished in South Florida.Also. Reclaimed Asphalt Pavement (RAP)wos used • for embankment material on the ramps and for subgrade material with the mixture of 30%sand in • order to achieve the required LBR of 40 or greater. This is the first time that RAP has been used for embankment material in South Florida. Subsequent to this use. Miami-Dade County Public Works • Department's Chief of Construction Management, Octavio Marin, P.E., contacted Aurelio Matos • to get all respective information for its use. RAP material was used by Miami-Dade County for • embankment material on the reconstruction of NW 87th Ave.over 1-75. Duration: 12/1999- 11/2001. Cost: $15M. Contact: FOOT Contact Person- Dari Vorce, District Six Construction Project Manager, • 305 499.2392 • • Roadway Widening and Reconstruction Projects, Palm Beach County, Florida(FDOT Category: 10.1. • 10.3) - Project Engineer for severol projects under this contract including: SR 805, from SR 5 to 6th Avenue South; from 6th Avenue South to 10th Avenue North; and 10th Avenue North to Arlington • Drive. These three projects were under construction simultaneously under different innovative • contracting methods and by two different contractors. Duration: 4/1999 - 11/1999. Cost: $1OM. • Contact: FDOT Contact Person-Al Ewing. District Four Construction Project Manager,561.432.4966 • (RETIRED) • Widening and Reconstruction of S.W. 137th Avenue(Tallahassee Road)(Speedway Blvd.),from the • Homestead Extension of the Florida's Turnpike (HEFT)to SW 336th Sheet (Homestead-Miami Motor • Speedway), North&South Projects.Miami-Dade County,Florida(FDOT Category:10.1,10.3, 10.5.1)- Senior Project Engineer. These two projects were under construction simultaneously with two different • prime contractors. Widening and reconstruction from two lanes to four lanes with a raised median • and turning lanes,drainage system utilizing drainage structures along the curb line that discharged to • a slab covered trench in the median area.new curb and gutter.lighting.signalization,landscaping, • pavement markings and signing. Constructed o new two-span AASHTO concrete beam bridge over the C-103 Canal. Completed the final estimates for these two projects with no procedural errors and • commended by the FDOT District Six office. Duration: 12/1997-3/1999. Cost: $8M.Contact: FDOT • Contact Person-Dari Vorce.District Six Construction Project Manager.305.499.2392 • Cba > www.bermelloajamil.cam • 59 • • • • • • O O • Teresita C. Garcia • Partner, Public Involvement Director • • _ Professional Experience nY Tere Garcia has more than 25 years experience in the fields of planning, public participation, • J' governmental and media relations. Eighteen of those years hove been spent specifically in the • , r_. -, , public involvement field concentrating on transportation and infrastructure projects. B&A has • - provided public involvement services to governmental agencies such as the Miami-Dade Expressway • S . Y . + ) Authority (MDX),the Florida Department of Transportation, Miami-Dade Transit Agency and Miami- V '/ Dade water and Sewer Department.Ms.Garcia oversees all public outreach activities for planning • and design projects for MDX including educational and informational efforts dealing with the • implementation of Open Road Tolling in the MDX System. She has been an integral part of the • visioning process used to perform the two updates to the MDX Long Range Master Transportation Plan and has delivered a successful program of public outreach for planning and design projects. • Ms. Garcia has established the guidelines for public involvement followed by MDX designed after • State requirements but tailored to the rapid pace and fast delivery of projects by MDX. She was • Principal-in-Charge of FDOT District Six. Districtwide Public Involvement Contract which includes public involvement services for over 100 planning or design projects since the onset of the contract • EDUCATION in 2006.Ms.Garcia is also the Principal-in-Charge of public involvement services for the Miami-Dade • Master in Urban Planning, University of Puerto Rico, 1979 Transit MIC Eariington Heights Connector and the Reconstruction of SR 9 for FDOT District 4. Ms. • Garcia directs all community and public outreach programs for public os well as private clients. • Master in Architecture. She also acts as a liaison between 8&A and Miami-Dade County and its municipalities in regulatory, • Tulane University, 1974 permitting and public affairs matters. • Bachelor of Architecture, • Tulane University, 1974 PROJECT EXPERIENCE • Miami-Dade Expressway Authority, Miami-Dade County, Florida - Public Involvement Director for COMMUNITY INVOLVEMENT General Engineering Consultant. Responsible for developing strategies and overseeing all public • Board of Governors Greater involvement and community awareness programs throughout the master planning and final • Miami Chamber of Commerce design phases of MDX's projects.This has included strategic and extensive community awareness • campaigns to reach the impacted communities using workshops,presentations to elected officials Greater Miami Chamber and Community Councils, open house, community meetings, speaker's bureaus, fact sheets, • of Commerce Executive newsletters.website. PowerPoint presentations and public hearings. • Transportation Committee • Can-four Supportive Housing. Highlights of current and past efforts include: • Board immediate past Chair, 2009 Open Road Tolling-MDX is seeking the implementation of all electronic Open Road Tolling for its five • expressway systems within Miami-Dade County.This is the first time that any toll agency is retrofitting • Leadership Florida,Council of an existing toll collection system into an all electronic collection system and simultaneously providing Advisors,Past Regional Chair for o more fair system of collecting tolls based on the distance the customer drives. Public outreach • and Board of Regents activities are based and built on research, surveys, focus groups, input from elected officials, • Trust for Public Lands Policy coordination with other local,national and international agencies and feedback from the general • Advisory Council public. A multi-phase. multi-year Community Outreach Plan has been prepared and built upon in • order to address a very challenging implementation from o public perspective. The preparatory St.Thomas the Apostle Building phases have included Key Opinion Leaders Surveys,one-on-one briefings with elected officials and • Committee Chair presentations to governmental,civic and grassroots groups. Open Road Tolling will be implemented • on a corridor-by-corridor basis.Each corridor receives unique attention and a strategic plan to fit the T AuthoritiesAmFL(Toll Membersmof needs and the community profile of the customers using the MDX system. • of Florida). • Member MDX Long Range Master Transportation Plan(2025 and 2035 Update) -Every five years MDX updates • their Long Range Transportation Plan and identifies new projects through a visioning process with • its Board of Directors, transportation partners and the public. This update included the use of a • new innovative preference survey technology (Turning Point) with the Board Members to gather and present live results of priorities for all presented projects. Initial tasks included working with the • technical planning team on a needs assessment of transportation needs in Miami-Dade County • and the identification on potential projects where MDX could be a catalyst in providing mobility to • • Cba > www.bermellocjamil.com • 60 • 0 0 0 0 0 0 OTeresita C. Garcia Partner, Public Involvement Director 0 the region. Public outreach consists of providing public involvement and information through the concept planning phase including interagency coordination and outreach to stakeholders in the area.Some of the projects where strategic public outreach is being implemented include: • • SR 924/Gratigny Extension West to the Turnpike Concept Report • • SR 874/Don Shula Ramp Connector to SW 136 Street Concept Report • • SR 924/Gratigny Extension East to 1-95 inclusion into the MPO 2030 Long Range Plan • US 1 Express Lanes 0 • MDX SR 874 State Environmental Report (SEIR) and Final Design - Led public involvement efforts • through the SEIR which included the preparation and implementation of a Public Involvement Plan for the proposed improvements to SR 874.The SEIR is on environmental impact study that evaluates • alternatives for corridor improvements and identifies mitigating measures where necessary as well as suggests specific projects and alignments. This project included the establishment of a close • working relationship with all district elected officials, the creation of a Citizens Advisory Committee, multiple community presentations and two Public Hearings. As the lead Public Information Officer • during the final design phase a process was designed to obtain community confirmation for noise O walls following stole guidelines with meetings, surveys and the preparation and execution of noise O wall agreements in coordination with MDX's legal counsel. • FDOT District 6,Public Involvement Districtwide Contract,Miami-Dade County&the Keys(2006-2011) • - Project Manager overseeing 8 public involvement specialists charged with providing outreach • services in relation to planning and design projects for FDOT. Personally led strategic efforts after 0 recent changes in legislation for Community Outreoch related to Improvements to the historically- • designated 57th Avenue Corridor from Bird Road to SW 8th Street. • Miami-Dade Transit(MDT)East/West Corridor-Orange Line,Miami-Dade County-Public Involvement 0 Officer for MDT's Supplemental Environmental Impact Statement evaluating a new segment of the O potential extension of transit facilities from the Miami International Airport to Florida International University.Led the governmental briefings to elected officials including briefing books and historical • perspective of the project.Public involvement efforts included outreach to impacted communities • within the unincorporated areas of Miami-Dade and municipalities such as the City of Sweetwater. ® East/West Multimodal Corridor/Miami Intermodal Center Studies,Miami-Dade County-Key member of the FDOT's "Connecting People" East/west Miami Intermodal Center and Multimodal Corridor Public Involvement Program. This project included the most extensive community participation 0 program of a Florida Department of Transportation project to date. Included homeowner and • business groups throughout the corridor and community-based organizations as well as elected officials. Responsible for coordinating the Governmental Affairs program. Designed neighborhood • and community strategies for delivery of project information to the public. 0 • South Dade Neighborhood Development Concept Plans ("The Moss Plan") - Project Director. Strategic planning study for Miami-Dade County's Office of Community Development,won Florida • Chapter of the American Planning Association Award of Merit. Addresses redevelopment of 14 • neighborhoods in South Dade damaged as result of Hurricane Andrew.Working closely with County • staff.successfully directed intense public participation campaign culminating in fifty meetings with • neighborhood residents and community-based as well as religious organizations. The Moss Plan pointed informational efforts in the right direction while transferring ownership of the plan to the 0 communities involved. • • Pump Station Improvement Program - Directed the Development Community Coordination office within the Miami-Dade Water & Sewer Department Pump Station Improvement Program. This was • used to reach out to inform builders.developers,realtors,lending institutions and potential investors O on how WASD's improvement program would affect them. Focused on conflict resolution and • designed a work schedule that strived to satisfy the needs of all involved. • Cb D www.bermellocjamil.com • 61 0 • • • • • • ATeresito C. Garcia • Partner, Public Involvement Director • • Broward County Office of Environmental Services Neighborhood Improvement Project - Public Involvement Project Manager. Responsible for the participation of four unincorporated Broword • County neighborhoods - Franklin Park. Washington Park. St. George West and St. George East. • Worked closely with the Design and Construction Team to effectively convey information to general • public and special interest groups. • Permitting Guidance/Assistance- Recognized for her work with local government particularly as it • relates to building and zoning matters.While at the Greater Miami Chamber of Commerce authored • the Guide to the Building Permit Process for the Unincorporated Areas of Metropolitan Dade County. • which outlines the building permit process and presents a description of the permitting agencies • responsibilities. This guidebook was prepared as a tool to facilitate the regulatory and permitting process to assist expanding companies and new firms relocating to the area. • • Transportation Projects, Greater Miami Director of Planning Development and Transportation - • Director for Planning Development and Transportation. Worked with economic development organizations in the review and analysis of local and state development regulations and acted as a • liaison between regulatory agencies and the business community.Led the staff effort in the creation • of broad-based business and community transportation coalitions and directed all committees of • the transportation group.Instrumental in the planning and implementation of the first Transportation • Summits established by the Chamber. • Greater Miami Chamber of Commerce Transportation Summit - Responsible for organization and • coordination of the Summit and community outreach program. Encompassed setting up meetings with grassroots organizations throughout Miami-Dade County to present together with representatives • from the Florida Department of Transportation,MPO,Miami-Dade County Public Works Department • and Miami-Dade Transit Agency the specific projects that are planned for each area. • • LECTURES/PUBLICATIONS • IBTTA (International Bridge,Tunnel and Turnpike Association)Special Summit on Open Road Tolling • Dallas,Texas • Speoker at Session"The Public Response to ORT" Communicating All Electronic Tolling at MDX-July 2008 • Fifth Brazilian Congress of Highway Concessionaires and ITS Brazil(ABCR) -Sao Paolo, Brazil • Speaker"Closing the MDX System with Electronic Toll Collection"-October 2007 • Co-authored article in Toll Trans Magazine:MDX-The Untolled Story • Co-authored article for the American Planning Association-The Pori of Miami Works Authored for the Greater Miami Chamber of Commerce-Guide to the Building Permit Process for • the Unincorporated Areas of Miami-Dade County • • • • • • • • • • • • • Cba > www.bermelloajamil.com • 62 • j ') APPROACH & METHODOLOGY • • Our design philosophy strives to achieve our client's needs and vision while reflecting our passion for • innovation and design excellence. It is founded on the premise that projects that are welcomed by • the public, technically and environmentally sound, affordable and completed on-time and on-budget • require a thorough understanding of the Client's needs and goals. • • • Understanding the Client's Need and Goals - We believe that our clients are our best source of • information and therefore we partner with them to develop realistic goals and expectations that • become the corner stone of a project's deliverable expectations with respect to design, • scheduling and available construction budget. • Existing Conditions - We develop solid technical innovative designs based on a thorough • understanding of the existing site conditions through the review of topographic and cadastrol • surveys, geotechnical testing reports, as-built plans, existing reports, utility markups and public sentiment. O • Permitting - An understanding of the regulatory permitting requirements and the limitations that these requirements pose on the design of the project will be clearly identified prior to engaging in • the design of the project. We will identify and understand these requirements and build into the • project the necessary components to avoid cost over runs and construction delays associated • with regulatory permitting. • • • Budgetary Constraints - We design to meet our Client's budgetary constraints. • ® • Scheduling - We develop flexible project schedules that are based on realistic goals, task • identification and task interrelationships. We will confirm that each task fits within the overall project • and target dates and provides for contingencies within the work plans. • • • Public Outreach - We assist our Clients in developing public awareness programs that promote • public buying to roadway and utility improvement projects through activities such as forums, open • houses, community meetings quarterly newsletters websites and public hearings. We have a • seasoned in-house staff that has directed numerous important community awareness programs. • Design Process • Our process is based on proven processes. Specifically, we carry out assignments and design projects • according to the following steps: • • • Project Team Selection - Our Project Manager, Jack Young, will evaluate the needs of the specific • assignment and determine, in conjunction with the discipline managers, the necessary staff and • technical resources required to deliver the project. S ® • Development of QA/QC Plan - We will prepare a project specific Quality Assurance/ Quality • Control )QA/QC) Plan. This plan will establish the protocols and QA/QC review intervals throughout • the planning, and design of the project. Our QA/QC Plan is built into the project not an added ® component. 0 • Cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY (CCNA) RFO No. 12-04-02 63 j APPROACH & METHODOLOGY r1 • • • • Data Collection - We will engage in the collection of all available data that is vital to analyzing the • current conditions and upon which the design criteria of the project will be based. • • • City of Sunny Isles Beach and B&A Partnership Meeting - We will meet with the City staff to discuss • in detail the needs and goals of the assignment. We will explain our preliminary findings with respect to data and permitting constraints and present our preliminary deliverable schedule. We • will obtain a clear understanding of the City's construction budget, scheduling needs and discuss • in concept possible solutions that are acceptable to the City. • • Design Criteria Report Preparation - We will review the collected data in detail, evaluate the current • conditions and develop a design approach.A report will be prepared for submittal to the City of Sunny Isles • Beach and once accepted by the City it will establish the criteria by which the project will be designed. • The report will contain assumptions, limitations, and constraints associated with the project as well as list • the regulatory agencies having jurisdiction over the project from which permits will be required.This report • will be the basis upon which the construction documents will be developed and the foundation for the • project. • • Preparation of Construction Documents - We will prepare Construction Documents based on traditional • project delivery schedules. As such,we will submit 30%, 60%, 90%, and 100% plans for review by the City of • Sunny Isles Beach staff. However, if necessary,we can compress the schedule of deliverables by reducing • the number of review submittals. We can also assign staff to work at the City of Sunny Isles Beach where • City staff can conduct reviews together with our staff and shorten the review period. • • CAD Capabilities and Available Software • We have the right tools such as numerous stations with AutoCad, ArchiCad, Microstations for roadway • and land development design, and stations with Geopak, Bentley's WaterCad, ADICPR, 3DMAX, 3D • Studio, Photoshop, MS Office, Primavera and Adobe InDesign. • • Quality Control/ Quality Assurance • B&A has developed and implemented a thorough and comprehensive Quality Control Manual that • ensures the minimizing of errors and omissions on projects. At B&A, project quality is built-in not added • on. Quality work is the direct result of careful, properly sequenced production, and continuous checking • of each work element for completion and correctness. The standard checking procedure in our Quality • Control Manual will be utilized for production checking. The Project Manager and the Responsible • Professionals are to continuously monitor and coordinate all aspects of the project and check the work • for inclusion of client's review comments and requirements. In addition, a Quality Assurance Quality • Control (QA/QC) team will review all work products prior to delivery to the City to ensure compliance • with program requirements, conformance with applicable codes,constructability and conformance with • the established construction budget. • • Experience Working with Regulatory Agencies B. Management of the Permitting Process • B&A has unparalleled experience with regulatory agencies and routinely interacts with municipal, county and state agencies.The team has extensive experience in processing and obtaining permits from • municipal, county and state agencies as well as environmental regulatory agencies such as: • • cba CONTINUING PROFESSIONAL ARCHITECTURAL& ENGINEERING SERVICES FIRMS ONLY(CCNA) RFQ No. 12-04-02 64 APPROACH & METHODOLOGY :) • • • South Florida Water Management District (SFWMD) • • Florida Department of Environmental Protection (DEP) • . • US Army Corp of Engineers (COE) • • DERM's Coastal and Fresh Water Wetlands • • Miami-Dade County Building and Zoning • • Miami-Dade County Fire Department • • Miami-Dade Water and Sewer Department (MDWASD) • • Miami-Dade Department of Environmental Resources Management (DERM) • • Miami-Dade Public Works Department • • State of Florida Department of Health • • • Florida Department of Transportation • B&A has implemented a streamlined permitting management approach based on the following basic steps: • e • Assign Permit Coordinator and Set Up Tracking Software • • Pre-Submittal Meeting with Agency Having Jurisdiction • • Parallel Processing Permit Approach • • Check Modifications Requested by Agencies • • Documentation to Assure Permitting Continuity from One Reviewer to Another • • Managing the Review of Contractor's Submittals and Responses to RFIs • B&A ensures that all contract general and special conditions clearly specified procedures and deadlines • for the submission of shop drawings,product data,working drawings,samples and RFIs.We typically specify • an allowance of 15 calendar days for review of shop drawings. We review submittals for conformance • to the requirements of the drawings and specifications and we stamp and sign them certifying approval, • disapproval or approval as noted. A detailed log is maintained at all times. Compliance with turn-around • review times is critical to ovoid contractor delay claims. • • Management of the Close-Out of Construction Contracts • B&A understands the critical importance of properly closing-out construction contracts. Elements that are • crucial are: • • • Documentation that work has been completed in accordance with Contract Documents • Contractor's submittal of as-built drawings and other record documents • • Contractor's furnishing evidence of compliance with requirements of governing authorities • • Review and approval of Contractor's final application for payment and submittal of properly • executed close-out documents. • • • •• • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFQ No. 12-04-02 65 APPROACH & METHODOLOGY • • Construction Management and Construction Engineering & Inspection Services • The B&A Team's primary goal is to assist the City of Sunny Isles Beach in meeting their primary goal of • delivering a quality product to the residents of the City, completing the projects with no time and costs • overruns, and expedite the resolution process of issues that arise during the course of construction. • • The B&A Construction Management (CM) and Construction Engineering & Inspection (CEI) Team will • perform Contract Administration and On-site Inspection services. It will be the team's overall responsibility • to make sure that the project is in conformance with the issued construction plans,standard specifications, • supplemental specifications, technical special provisions and the executed Contract. • Contract Administration • The CEI Team's responsibility will be to adhere to all of the following: • • • Maintain adequate qualified and experienced personnel for inspecting the contractor's • operations; • • Work closely with the City's Public Information Office to keep the public informed; • • Video tape the pre-construction conditions of the project site; • • • Construction plans, standard specifications, supplemental specifications, and technical special • provisions interpretation; 41 • Maintain accurate records of all construction operations and documents pertaining to the project; • • Hold pre-construction, project progress, and pre-activities (earthwork, concrete, and asphalt) • meetings; • • Review and process extra work change orders; • • Review and reply to Requests for Information; • Review and respond to Notices of Intent to Claim; • • Process progress payments to the Contractor; 3 Review and approve contractor's baseline • construction work schedule and monthly updates; • • Review and process shop drawings; • • Prepare and submit to the CPM a monthly status report and • • Prepare and submit Final Estimates package with As-Builts set of plans. S S S S I S S • S S S S • • • aba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFQ No. 12-04-02 66 • • • • • • • • • • • • • • • • • • • v) • LU • • U •• Z • LU • • OC • w • • U- • LU ••• Ce • • • `n •• • • • • I • • • • • • • • • • • A ) REFERENCES • • • • City of Pompano Beach CRA Miami-Dade County / Port of Miami • Horacio Donovich Bill Johnson • 100 W. Atlantic Blvd., Pompano Beach, FL 33060 1015 N.America Way,2nd Floor,Miami, FL 33132 • Ph.: 954-786.7834 Fx.: 954.786.4028 Ph.: 305.347.4844 Fx.: 305.347.4843 • Horocio.Danovich@copbfl .com BJ4@miamidade.gov • • Self Storage-Naranja, LLC Miami-Dade County / Pod of Miami •• David Fulton Victoria Valdez 651 Washington St., Brookline, MA 02446 1015 N.America Way,Miami,FL 33132 • Ph.: 617.938.6478 Ph.: 305.347.3239 Fx.: 305.347.3240 • Dfulton@ssadevelopment.com valdezv@miamidade.gov • • • City of Doral City of Pompano Beach • Fanny Carmona Alessandra Delfico • 8300 NW 57 Street, Doral, FL 33166 1201 NE 5 Avenue. Pompano Beach, Fl 33060 Ph.:305.593.6725 Fx.: 305.406.6737 Ph.: 954.786.4144 Fx.: 954.786.4028 • Jose.Olivo@cityofdoral.com Alessandra.Delfico@coobfl.com • • State of Florida Department of • Management Services • Jere Lahey • 4050 Esplanade Way, Tallahassee, FL 32399 • Ph.: 904.359.6093 Fx.: 850.922.6149 • jere.lahev@dms.mvflorida.com • • • • • • • • 0 • • • • • • • • • • • • Cba CONTINUING PROFESSIONAL ARCHITECTURAL & ENGINEERING SERVICES FIRMS ONLY(CCNA) • RFO No. 12-04-02 67 A • • • • CRA • • • POMPANO BEACH ® P. O. Drawer 1300 Phone: (954) 786-5535 • Pompano Beach, FL 33061 Fax: (954) 786-7836 • • • April 21, 2010 • • Miami Community Redevelopment Agency(CRA) • 49 NW 5 Street, Suite 100 • Miami, FL 33128 • • • RE: Bermello Ajamil &Partners,Inc. - Letter of Recommendation • To Whom It May Concern: • I am happy to recommend Bermello Ajamil & Partners, Inc. ("BA")and I take this opportunity to provide • you some additional information, which may be useful during your review of the firm. • • The firm strives to keep us informed of any progress and status of each assigned project BA personnel is • courteous and responds to requests in a timely manner using a variety of methods including, but not • limited to,telephone calls(regular and cells),e-mails, mail, and in person(meetings or periodic visits). • The firm is very familiar with our Agency's needs and/or assigned project(s) and has demonstrated a • comprehensive knowledge of our present infrastructure. This is the result of working together and • combining forces every step of the way. The firm has assisted the CRA in implementing specific services • aimed at meeting State and County requirements. • It is our belief the firm is widely knowledgeable of governmental funding avenues, i.e. SFWMD, FEMA • etc., and at the present time, the firm is assisting the CRA to obtain a series of permits and licenses for a • sizable venture. • The firm is presently under contract to provide professional services (i.e., civil engineering, architectural • landscaping, lighting, site planning, to name a few) as a prime or sub-consultant for the following • projects: • • Fact Atlantic Boulevard (prime, $1,000,000.00) — Roadway/Streetscape Design including 0 widening sidewalks, additional drainage,narrow existing roadways, widening landscape medians. 0 • Harbor Village (prime, $1,000,000.00) — Civil and Architectural Landscape Design including • widening sidewalks, additional drainage, reconfiguration of an existing public parking facility, O landscape plans. 0 • Pompano Beach Boulevard (sub-consultant, $7,000,000.00) — Civil and Architectural Landscape O Design including widening sidewalks, reconfiguration of an existing public roadway, beach plaza o and on-street parking facilities. 0 • Collier City(prime, $110,000.00)—Planning services for a Neighborhood Plan to identify needs, • funding sources,etc. • rsizi 0 O 68 A • • • • CRA• • • POMPANO BEACH • P. 0. Drawer 1300 Phone: (954) 786-5535 • Pompano Beach, FL 33061 Fax: (954) 786-7836 • • • To the best of my knowledge the firm has a good working relationship with executive and legislature • branches of the state and county elected officials. In addition, it is my understanding that members of the firm are actively involved with other government agencies. • • The firm works and coordinates activities very well with other consultants and maintains a professional • level of communication with all other members of the design team(s). In addition, the firm interacts as a • team member with other engineering firms working for the City on a variety of multi jurisdictional • projects. • • I have personally known the firm or representatives from the firm for quite sometime and I consider the • firma professional outfit with a professional attitude. Every member of the firm with whom I had the pleasure of working with has shown an ability to communicate, coordinate activities, follow up with • updates and progress information, and do the work proficiently. I have no qualms in stating that the firm • is at the top of my list of vendors for any engineering and architectural services related work. • • If you require any further assistance, please do not hesitate to contact me at(954) 786-7834. • • Sin - • >k • Horac b< . ich, CRA Engineer • • \v • • • to • • • • • 0 • 0 • • • • • •• epQ • 1 • • 69 • • • • • /Alessandrog elficogf'E pp om ano (City/Engineer /7beach 11201U1NE$PwAve? 1 Pi Florida Warmest Welcome • IPompanoABeadh,IFLe3306.0loos; 0 • Office (954) 786-4144 City of Pompano Beach Fax (954)786-4028 • • • • April 21, 2011 • • • • • To Whom It May Concern: •• I am pleased to provide a letter of reference for Bermello Ajamil &Partners, Inc. • • Bermello Ajamil & Partners, Inc. (B&A) was contracted by the City of Pompano Beach to provide • professional services, including architecture, engineering, planning and landscape architecture for • the design of Palm Aire Park, a 5 acre neighborhood park for the Palm Aire Community. B&A carried • out this project from initial conceptual design through to complete construction drawings as well as • permitting. B&A also performed public information workshops with local neighborhood groups. • • I personally worked with Randy Hollingworth and others from B&A who have worked on the various • stages of the project. The B&A staff are always professional, cooperative, timely with their services • and deliverables and expert in their field. They are highly recommended by our office. • • Please feel free to contact me with any questions. • • Sincerely, • C� O X C//wfro-d `R- r "/ •O Alessandra Delfico, P.E. V • City Engineer 0 0 • • • • • • • • • 70 s w • • •• • • FLORIDA DEPARTMENT OF STATE • Kurt S. Browning • Secretary of State • DIVISION OF HISTORICAL RESOURCES • • • September 17, 2007 • • City of Fort Myers • Purchasing Division • 1820 Hendry Street • Fort Myers, FL 33901 • • RE: Letter of Reference. Bennello Ajamil & Partners. Inc., marine engineering services • • To Whom It May Concern: • • We are pleased to provide a letter of reference for Bennello Ajamil & Partners, Inc. • • Bennello Ajamil was contracted by the State of Florida to design and obtain permits for a new • seawall at the sensitive archaeological site known as the Miami Circle in downtown Miami. Not • only has Bermello Ajamil engineer Frank Tejidor kept on top of that project, but he designed and • managed construction of emergency repair work that was needed when the old seawall failed. • Remedial work was designed, permitted and installed in just a little over a month after the failure. • This involved extensive coordination with federal, state and local regulatory agencies. • • We have found Bennello Ajamil & Partners, Inc. to be professional, yen' responsive, and expert in • their field. They are highly recommended by our office. • Thank you for this opportunity to recommend Bermello Ajamil & Partners, Inc. Please feel free to contact me with any questions. O • Sincerely. • —VA rii4L--t- • Ryan J. Wheeler, Ph.D. Phone: 850.245.6444 • State Archaeologist and Chief, FAX: 850.245.6452 • Bureau of Archaeological Research E-mail: rjwheeler@dos.state.fl.us dos.state.fl.us • cc: Frank Tejidor, Bermello Ajamil & Partners. Inc. • • 500 S. Bronough Street, MS#8b • Tallahassee, FL 32399-0250 • http://www.flheritage.com • 0 Director's Office ® Archaeological Research 0 Historic Preservation O Historical Museums • (850)245-6300•FAX:245-6436 (850)245-644 • FAX:245-6452 (850)245-6333•FAX:245-6437 (850)245-6400• FAX:245-6433 • 0 Southeast Regional Office 0 Northeast Regional Office 0 Central Florida Regional Office (561)416-2115• FAX:416-2149 (904)825-5095• FAX:825-5044 (813)272-3843• FAX:272-2340 • 71 • • • • 6 v xn, Governor Charlie Cnst • . ;�f, _ Secretary Linda H.-South ,: i " . Division of Real Estate Development • :^� and Management • `r 921,N.Davis sweet g • DEPARn INTOiMANAGaMENT-. '. Florida32209 C • Jacksonville rida . • SERVICES ® 904-359-6093:TEL 904-359-6281:FAX • http//.dms myflonda.com < • • • September 18,:2007 • Re: Recommendation for Bermello Ajamill & Partners,Inc., Marine Civil Engineering Division ` _ 0 • To Whom It May Concern: O .. • Our seawall-repair and replacement project on the Miami River as managed by:Bermello.Ajamill &Partners • chief marine engineering engineer, Frank Tejidor, P.E., has exceeded our expectations. 0 • Our"division'works.with a wide variety of design professionals on an annual basis and we can positively state • that Frank Téjidois leadership and professional skills are exceptional and greatly appreciated. • • Therefore,without reservation I can recommend Frank's group for any other marine civil engineering project. • : • Since ely, • O -K • ere Lahey R A. • D Pro- ject`Director • O O O' O . O O O O. • O • • • 6 72• • • CITY OF SUNNY ISLES BEACH 1807.0 Collins Avenue. Sunny Isles Beach, Florida 33160 ton""�r1i;:., 305:947.0606 ,°iAw�gs��°„,. www.sibfl.net •7� • n • i .. • ot 1.0 • O1 SUS 04 • • • • • • • • DELIVER TO: REQUEST FOR • City of Sunny Isles Beach QUALIFICATIONS OPENING: 10:00 A.M. • City Clerk SECTION 6 05/01/2012 • 18070 Collins Avenue BID SUBMITTAL FORMS • Sunny Isles Beach, FL 33160 • • • • • • Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of • 04/02/2012 Pages 27 through 30 • O Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are • attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk • at the address shown above until the above stated time and date, and at that time, publicly opened for • furnishing the supplies or services described in the accompanying Bid Submittal Requirement. • RFQ 12-04-02 • Continuing Professional Architectural & Engineering Services Firms Only (CCNA) • A Bid Deposit in the amount of 0%of the total amount of the bid shall accompany all bids • • A Performance Bond in the amount of 0%of the total amount of the bid will be required upon execution • of the contract by the successful bidder and City of Sunny Isles Beach • Procurement Agent Firm Name: Marcanthony Tulloch • Bermello Ajamil & Partners, Inc. • Commodity Codes): Civil Engineering • • • RETURN ONE(1) ORIGINAL, ONE COPY AND ONE ELECTRONIC COPY ON CD OR DVD OF BID • SUBMITTAL PAGES AND AFFIDAVITS • • FAILURE TO SIGN PAGE 30 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON- • RESPONSIVE • • City of Sunny Isles Beach I Request for Proposal No. 12-04-02 27 • • 73 • A CITY OF SUNNY ISLES BEACH 1807,0 Collins Avenue Sunny Isles Beach, Florida 33160 `SUNNY„rfj 305:447.0606 ° www.sibfl.net •''I(fes "t` ' {{gy,I�, �1 `OY ' • (• .410 G 'Of SUN�� • • • SECTION 6 0 • BID SUBMITTAL FOR: 0 0 ACKNOWLEDGEMENT OF ADDENDA 0 0 ® INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES 0 • PART I: • LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID • • Addendum #1, Dated 4/26/12 • Addendum #2, Dated 4/26/12 • Addendum #3, Dated ;413011a • • Addendum #4, Dated 5(1 11a oAddendum #5, Dated 0 Addendum #6, Dated • o Addendum #7, Dated 0 Addendum #8, Dated • 0 o PART II: • ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID 0 0 • • FIRM NAME: Bermello Ajamil &/aTtners, Inc. 0 ' O AUTHORIZED SIGNATURE: { , _ DATE: 4/30/12 ® TITLE OF O• ICER: Vice President 0 O City of Sunny Isles Beach I Request for Proposal No. 12-04-02 28 0 • 74 0 A CITY OF SUNNY ISLES BEACH • 18070 Collins Avenue Sunny Isles Beach, Florida 33150 `SUNNY' ti • 305.947.0606 ° www.sibfl.nel '. • • ar • Fl0♦ SS' G • �'�or SUS �� • • • BID SUBMITTAL FORM • • Bid Title: Continuing Professional Architectural & Engineering Services Firms Only (CCNA) • • The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with • the City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents and in accordance with the other terms and conditions of the Contract Documents. • The Proposers accepts all of the terms and conditions of this or Request for Qualifications. This Bid will • remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and • submit the Agreement with the other documents required by the Bidding Requirements within ten days • after the date of the City's Notice of Award. • In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: • • The Proposer has familiarized himself/herself with the nature and extent of the • Contract Documents, Work, site, locality, and all local conditions and Law and • Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • • The Proposer has given the City written notice of all conflicts, errors, • discrepancies that it has discovered in the Contract Documents and the written • resolution thereof by City is acceptable to the Proposer. • o • This Bid is genuine and not made in the interest of or on behalf of any • undisclosed person, firm or corporation and is not submitted in conformity with • any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other • Proposers to submit a false or sham Bid; the Proposer has not solicited or • induced any person, firm or corporation to refrain from Bidding; and Proposer ® has not sought by collusion to obtain for itself any advantage over any other • Proposers or over the City. • The City and the successful Proposer will establish completion times for each individual Work Item and • the successful Proposer agrees that the work will be completed within the time frames agreed upon and • stipulated in the individual Purchase Orders and/or Notice to Proceed. • • • • • • • • • • City of Sunny Isles Beach I Request for Proposal No. 12-04-02 29 • • 75 • a CITY OF SUNNY ISLES BEACH 18070 Collins Avenue Sunny Isles Beach, Florida 33150s' '+" rrf�, 305.947.0606 �, wvnv,sibfl.nel % "2 n • o 0 A Pi 00 Cr ® _ •F or suN p. • • Firm Name: ® Bermello Ajamil & Partners, Inc. Street Address: ® 2601 South Bayshore Drive, Suite 1000, Miami, FL 33133 ® Mailing Address (if different): • Telephone No. 305.859 .2050 Fax No. 305.859 . 9638 ® Email Address: JFerrer®bermelloajamil.com FEIN No. 5 / 99/LJ.2_/�4 A/6 • S S • * "By signing this document the bidder agrees to all Terms • Signatu• • 6 ® • at e of authorized agent) Print Name: Jorge Ferrer O O Title: Vice President 0 O THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO ® BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL 0 NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY ® PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE ® PROPOSER TO THE TERMS OF ITS OFFER. C 0 O • • • City of Sunny Isles Beach 'Request for Proposal No. 12-04-02 30 • • 76 • a CITY OF SUNNY ISLES BEACH 18070 Collins Avenue Sunny Isles Beach, Florida 33160 sown.rt�Ft 305.947.0506 wwwsibfl.net •St% •7 i' 0 1t, • ri0�• 5I, • CfPP Or SUN Is14 • • • • AFFIDAVITS • • • • • • SosNY is , • • O(< • r • • U `ii' •t, `\ ,� _ • * • -i • * _ • y f.r cV 1�•� * • ) Ti • y 9) \• Q �P • F * FLO ?' o C,r �° • Y OF SUN • • 0 0 0 • 0 • • • • • • • • • • City of Sunny Isles Beach I Request for Proposal No. 12-04-02 31 • • 77 • a 0 SVNNY • _ was n NON - COLLUSION AFFIDAVIT City of Sunny Isles Beach • • Yx ,, 18070 Collins Avenue • r r o�� o Sunny Isles Beach,FL 33160 o, .0 '� Telephone:(305)947-0606 Fax:(305)949-3113 I STATE OF FLORIDA COUNTY OF Miami-Dade) • The undersigned being first duly sworn as provided by law,deposes,and says: • This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be • relied upon by said County,in any consideration which may give to and any action it may take with respect to this Bid. • The undersigned is authorized to make this Affidavit on behalf of, • • Bermello Ajamil & Partners, Inc. • (Name of Corporation,Partnership,Individual,etc.) ® a, Corporation formed under the laws of Florida (Type of Business) (State) • • of which he is Vice President • (Sole Owner,Partner,President,etc.) S • Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any • department or employee therein,or any officer of the City of Sunny Isles Beach,Florida is directly interested therein. • This Bid is genuine and not collusive or a sham;the person,firm or corporation named above in Paragraph 10.2 has not colluded,conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid,or that such person, firm or corporation,shall refrain from Bidding, and has not in any manner,directly or indirectly, sought by agreement or collusion, or communication or conference with any person,firm or corporation,to fix the prices of said Bid or Bids of any other proposers;and all statements contained in • the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2,has directly or indirectly submitted said Bid or the contents thereof,or divulged information or data relative thereto,to any association or to any member or agent there. . 0 • Jorge F-rrer :✓ vice President • AFFIANT'S NAME AFFIANT'S TITLE n' TAKEN WORN AND SUBSCRIBED TO BEFORE ME this 30 day of NPL1 .2o6 . ANGEUCACAMACHO Personally Know or Produced Identification r mY 201115 • Type of identification E%PIu Pen/P 1U*11 � Bonded TMu Mars'/P1tAa Udrr/aien ® (Affix seal here) r Ar • NOTARY •TBLIC n:me printed or typed) • • • O• • • • DECEMBER 28.2010 1 of 7 • 78 Mk a f /a® `7.oan Jr; � PUBLIC ENTITY CRIMES 1 • b- City of Sunny Isles Beach ® 18070 Collins Avenue \''• r.o0••° Sunny Isles Beach,FL 33160 • "•o, sus 'moo, Telephone:(305)947-0606 Fax:(305)949-3113 • SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) • FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES • Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate • who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a • Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a O public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of 0 real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess • of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on • the convicted vendor list". • THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. • • 11.1. This sworn statement is submitted to City of Sunny Isles Beach • • by Jorge Ferrer ® 'print individuals name and title' • for Bermello Ajamil & Partners, Inc. • 'pont name of entity submitting sworn statement' • whose business address is: ® 2601 South Bayshore Drive, Suite 1000 • Miami, FL 333133 a • and (if applicable) its Federal Employer Identification number(FEIN) is 59-1722486 • (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn • statement: .) • 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a • violation of any state or federal law by a person with respect to and directly related to the transaction of • business with any public entity or with an agency or political subdivision of any other state or with the e United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving • antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. • • 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a • finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any • federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. • • 11.4. I understand that an "affiliate"as defined in Para. 287.133(1)(a), Florida Statutes, means: ® a.) predecessor or successor of a person convicted of a public entity crime; or • b.) Any entity under the control of any natural person who is active in the management of the entity • and who has been convicted of a public entity crime. The term "affiliate" includes those officers, • directors, executors, partners, shareholders, employees, members, and agents who are active in B the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair O oEurimF 26.2010 2 of 7 79 • w • • • market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who • has been convicted of a public entity crime in Florida during the preceding 36 months shall be • considered an affiliate. • 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural • person or entity organized under the laws of any state or of the United States with the legal power to • enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or • services let by a public entity, or which otherwise transacts or applies to transact business with a public • entity. The term "persons" includes those officers, directors, executives, partners, shareholders, • employees, members, and agents who are active in management of any entity. • 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity • submitting this sworn statement. (Indicate which statement applies.) • X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any ® affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, • 1989. •• The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, • shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, • 1989. • The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, • shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, • 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of • Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the • State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer • determined that it was not in the public interest to place the entity submitting this sworn statement on the • convicted vendor list. (Attach a copy of the final order.) • I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE • PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, • THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO • A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA • STATUTES, FOR CATEGORY TWO OF ANY, C.AN'E I THE INFORMATION CONTAINED IN THIS FORM. • • By: • /G✓ps/ (S'.na ire) • Jorge Ferrer • (Printed Name) • Vice President • (Title) A • Sworn to and subscribed before me this 30 day of Air l , 20 12 , by • • A44. • (AFFIX NOTAN?Y Y Ht ip ps S MY COMMISSION t EE 114560 • EXPIRES:July 21,2015 Signature: Notary Public/'1State of Florida • ecresnamarylaecuroe.ees Q) ca Ca lYjpG�tO r • Print or Type Commissioned Name Personally Known OR Produced Identification • • Type of Identification Produced ® 10/1998 3 of 7 80 • • • • S,NNY/S[f • O .,,,-7�f 0 • �,,� b, EQUAL OPPORTUNITY / • AFFIRMATIVE ACTION • • City of Sunny Isles Beach • °. o. .Mw' 18070 Coffins Avenue Sunny Isles Beach,FL 33160 • Telephone:(305)947-0606 Fax:(305)949-3113 • • EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT • • The contractors and all subcontractors hereby agree to a commitment to the principles and • practices of equal opportunity in employment and to comply with the letter and spirit of • federal, state, and local laws and regulations prohibiting discrimination based on race, • • color, religion, national region, sex, age, handicap, marital status, and political affiliation or • belief. • • Signed:Cy • • Title: Vice President • • Firm: Bermello Ajamil & Partners, Inc. • • Address: 2601 South Bayshore Drive, Suite 1000 • • Miami, FL 33133 • • • • • • • • • • • • • • • • • • • • • • • • DECEMBER 2a.2010 4 of 7 CO 81 w 0 0 0 `SUNNY as,Ff o G . I„ • pax , CONFLICT OF INTEREST I • City of Sunny Isles Beach • 18070 Collins Avenue .s.''',•�1o`•oe�s Sunny Isles Beach.FL 33160 'or ,o '" Telephone:(305)947-0606 Fax:(305)949-3113 • • CONFLICT OF INTEREST STATEMENT • The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the • City of Sunny Isles Beach or its agencies. • STATE OF FLORIDA • COUNTY OF Miami-Dade • • BEFORE ME, the undersigned authority, personally appeared Jorge Ferrer , who was duly sworn, deposes, and states: • • 18.1. I am the Vice President of • Bermello ?damn & Partners, Inc.with a local office in Broward, FL and principal office in Miami, FL . • • 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 12-04-02 described 0 as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. • • 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. • • 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in • any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and • execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from • 0 participation in contract letting by any local, State, or Federal Agency. • 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. • • 18.7 I certify that no member of the entity's ownership or management is presently applying for any employee position or • actively seeking an elected position with the City of Sunny Isles Beach. O 18.8 I certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City • of Sunny Isles Beach. • 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will • immediately notify the City of Sunny Isles Beach. • gat•• is 13* day of A c , 20yi12 0 ...-- Jorge Ferrer • • 1T Print or Type Name and Title • Sworn to and subscribed before me this 30 day of Apy 11. , 2061. f Z Personally Known OR • ❑ Produced Identification ; Type of ldentific.lion • " Ai 1' • NOTARY PUBLIC STATE OF FLORIDA � I I 5 > v • .:Ps ANGEUCACAMAI>03 IV COMMISSION I EE 114560 • C EXPIRES:July 21,2015 • f fia d lMu Nolay Pit&WiOarKGn S DECEMBER 28,2010 5 of 7 ® 82 0