Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
J. Bonfill
I 0 9JL7 NNY 'S S <F �c ISLES SUNNY BEA Ha 9 �P 'P .. e . FL00. z C')-r of SUN 'a0 I Continuing Professional I Architectural & Engineering Services I Firms Only ' RFQ- 12-04-02 I I 1 J . BONFILL & ' ASSOCIATES I PRIME CONSULTANTS: I ARCHITECTS I /40N . ILL LAND SURVEYORS & MAPPERS I SUB CONSULTANTS: VITAL ENGINEERING, I MEP & LEED I NIFAH & PARTNERS, STRUCTURAL ENGINEERS II fl Letter of Interest 1 I1 . Company Information Summary 2 SF 330 Part I Contract Specific Qualifications - J. Bonfill 3 I SF 330 Part I Contract Specific Qualifications - Vital 4 SF 330 Part I Contract Specific Qualifications - Nifah 5 I 2. Qualifications SF 330 Section D - Organizational Chart 6 SF 330 Section E- Resumes - J. Bonfill - Architecture 7 ISF 330 Section F- Relevant Projects - J. Bonfill - Architecture 11 SF 330 Section G- Personnel Participation - J. Bonfill - Architecture 21 I SF 330 Section E- Resumes - J. Bonfill - Surveying 22 SF 330 Section F- Relevant Projects J. Bonfill Surveying 26 SF 330 Section G- Personnel Participation - J. Bonfill - Surveying 35 ISF 330 Section H- Additional Information - J. Bonfill 36 SF 330 Part II General Qualifications - J. Bonfill 38 I SF 330 - Vital - MEP & LEED 39 • SF 330 Nifah Structural 45 Summary of Qualifications 55 II3. Staffing - Relevant Experience Key Personnel & Project Managers Architecture 56 ISurveying 60 MEP & LEED 63 I Structural • 71 Professional Licenses 80 Certificates of Insurance 92 I4. Approach / Methodology 97 Legal Claims 104 I S. References 105 6. Contract Forms 1 12 Corporation Certificate 124 ICertified Minority Business Certifications 125 I I I Table of Contents I I 1 D 0 A 0 1 a a v t t Letter of Interest ' • 1 I/ J Bonfill&Associates RFQ#12-04-02 Page 1 J . BONFILL & ASSOCIATES Olitl Architect s L a n d Surveyors & Mappers II `' SFr Letter of Interest y...41_, ra' May 1st,2012 City of Sunny Isles F `! r 18070 Collins Avenue � d' •� ISunny Isles Beach, Florida 33160 Re: Continuing Professional Architectural&Engineng Services-Firms Only-RFQ 12-04-02 . IDear Selection Committee Member, lIC■ We are pleased to present our professional qualifications and this letter of interest to participate in the City of Sunny Isles Beach's Request for Qualifications for Continuing Professional Architectural & Engineering Services Firms I Only. We have attached all required information outlining the background of our team. J. Bonfill&Associates is experienced in Architecture, Land Planning and Development, Construction Management, Land Surveying &Mapping and Underground Utility Location. We are currently involved in projects that require state of the art I technology and innovative design for federal, state, municipal agencies and private developers. These projects demand great attention to detail, management, time constraints and budget. Our firm is capable and willing to meet The City of Sunny Isles Beach's time and budget requirements. Our firm, together with our consultants, meets and exceeds the requirements in The City's request for qualifications. Our proposed team and description of services for the City of Sunny Isles Beach RFQ 12-04-02: I As Prime Consultants our firm,J. Bonfill&Associates will be responsible for: Architecture, Construction Management,ADA Title II Specialists Services Land Surveying&Mapping Services, Underground Utility Location Services Our team of Minority Certified Professional Consultants will consist of: • I Vital Engineering, Inc.responsible for: Mechanical, Electrical,Plumbing Engineering&LEED Nifah&Partners Consulting Engineers responsible for: Structural Engineering. Our firm and consultants are familiar with the requirements and scopes of work that are associated with the City of Sunny IIsles Beach Request for Qualifications for Continuing Professional Architectural&Engineering Services. We are familiar with the unique requirements that are associated with municipal projects. Our staff has been responsible for producing preliminary cost budgets and scope of work and are able to breakdown all aspects of a project to determine I their adequacy. Recent similar projects requiring this specialized attention are included in our relevant experience. As Architects our role is to respond not only to the project user's needs but also to address the needs of the community surrounding our project. I As president of J. Bonfill and Associates, I will lead our firm and team and serve as principal in charge. I have twenty six years of experience in architecture, construction administration, land planning, land surveying and developing. As architect of record for many new, remodeling and renovation projects that are large and complex, I have selected the team of engineering consultants, coordinated all aspects of the work, from initial planning, construction documents, I permitting,construction sequencing and construction administration. We carefully selected the consultants in our team. Vital Engineering is presently designing a 9-story office and parking garage building designed to earn LEED certification for new construction. Nifah & Partners is involved in high-rise buildings including parking garages, courthouse renovations and addition project, structural investigations and reports, • I inspections, repair of construction failures and cost estimation. Our consultants represent experienced professionals with the necessary experience and resources to provide the highest level of engineering services. Our proposed team is capable of providing the City of Sunny Isles Beach with complete professional services for projects of all scope and sizes. We believe that with our diversified background, design and construction related experience; J. Bonfill &Associates and Iits consultants is uniquely qualified to offer professional services to The City of Sunny Isles Beach. U{. SSincerely, I ac J queline Bonfill Geet Registered Architect President I I I7100 SW 99'^ Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 • AAC002050 • LB3398 • www.jbonfill.com I • • J Bonfill&Associates RFQ#12-04-02 Page 2 J . BONFILL & ASSOCIATES Architects Land Surveyors & Mappers Company Information Proposer: J. Bonfill & Associates, Inc. — Prime Consultant responsible for: Architecture Construction Management ADA Title II Specialists Services Land Surveying & Mapping Services Underground Utility Location Services Location: 7100 SW 99t Avenue Suite 104 Miami, Florida 33173— Sole Location Website: www.ibonfill.com Structure: Corporation State of Florida Corporation Certificate Number L02047 Founded: 32 years - Corporation established in the State of Florida 05/1980 ' Home Office: Tel: 305-598-8383 Fax: 305-598-0023 Litigation: J. Bonfill & Associates, Inc. has NO Outstanding Litigation/Claims. Insurance: Meets RFQ Requirements-Certificate is included Response: Our entire team's staff is available to commence immediately 1 Consultant Information Vital Engineering, Inc. Responsible for: Mechanical, Electrical, Plumbing Engineering & LEED ' Location: Website: 7100 SW 99th Avenue Suite 202 Miami, Florida 33173—Sole Location email: vitaleng@aol.com Structure: Corporation State of Florida Founded: 19 years Home Office: Telephone: 305-412-6000 Insurance: Meets RFQ Requirements-Certificate is included Nifah & Partners Consulting Engineers Responsible for: Structural Engineering Location: 8785 SW 165th Ave Suite 108 Miami, FL 33193—Sole Location Website: www.nifahpartners.com email: snifah@nifahpartners.com Structure: Corporation State of Florida Founded: August1995 Home Office: Tel: 305-386-1002 Insurance: Meets RFQ Requirements-Certificate is included ' I I 7100 SW 99'" Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com I I - • J Bonfill&Assodates RFO#12-04-02 Page 3 I ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS IA.CONTRACT INFORMATION 1.TITLE AND LOCATION(City and State) I Continuing Professional Architectural& Engineering Services Firms Only(CCNA), Sunny Isles Beach. Florida 2.PUBLIC NOTICE DATE 3.SOLICITATION OR PROJECT NUMBER 04-02-2012 Sunny Isles Beach RFQ # 12-04-02 I B. ARCHITECT-ENGINEER POINT OF CONTACT 4.NAME AND TITLE Jacqueline Bonfill Gee, R.A., President I 5.NAME OF FIRM J.Bonfill&Associates, Inc. 6.TELEPHONE NUMBER 7.FAX NUMBER 8.E-MAIL ADDRESS 305-598-8383 305-598-0023 jackie@jbonfll.com I C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) Icc u • o 9. FIRM NAME 10.ADDRESS 11. ROLE IN THIS CONTRACT IA Z Or-tt 8 U 2 tqp I J. Bonfill&Associates, Inc. 7100 SW 99m Avenue Architects Suite 104 Architectural Construction Management a. X Miami, Fl 33173 ADA Title II Specialists Land Surveying and Mapping Services I ❑ CHECK IF BRANCH OFFICE Underground Utility Location Vital Engineering, Inc. 7100 SW 99m Avenue MEP Engineers: Suite 202 Mechanical, Electrical Plumbing& b. X Miami, Fl 33173 LEED ❑ CHECK IF BRANCH OFFICE Nifah and Partners 8785 SW 165`"Avenue Structural Engineers Suite 108 - C. X Miami, Fl 33193 ❑ CHECK IF BRANCH OFFICE I d. ❑ CHECK IF BRANCH OFFICE I e. 0 CHECK IF BRANCH OFFICE • ❑ CHECK IF BRANCH OFFICE ID.ORGANIZATIONAL CHART OF PROPOSED TEAM ® (Attached IAUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I J Bonfill 8 Associates RFD#12-04-02 Page 4 I. ARCHITECT - ENGINEER QUALIFICATIONS ■ PART I -CONTRACT-SPECIFIC QUALIFICATIONS IA. CONTRACT INFORMATION 1. TITLE AND LOCATION(City and State): Continuing Professional Architectural&Engineering Services Firms Only. 2. PUBLIC NOTICE DATE: April 02,2012 I3. SOLICITATION OR PROJECT NUMBER: RFQ No. 12-04-02 B. ARCHITECT-ENGINEER POINT OF CONTACT I4. NAME AND TITLE: Nelson Vital,P.E.-President 5. NAME OF FIRM: Vital Engineering,Inc. I 6. TLEPHONE NUMBER: 305-412-6000 7. FAX NUMBER 305-412-6005 6. E-MAIL ADDRESS:vitaleng@aol.com IC. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) 9a. PRIME(CHECK HERE): 9a. JOINT-VENTURE PARTNER(CHECK HERE): 9a. SUBCONTRACTOR(CHECK HERE): X 1 9a. FIRM NAME: Vital Engineering,Inc. 9a. IF BRANCH OFFICE CHECK HERE: I10a. ADDRESS 7100 S.W.99th Avenue,Suite#202 -Miami,Florida 33173 11a. ROLE IN THIS CONTRACT Electrical,Mechanical and Plumbing (MEP)Consulting Engineering Services. I 9b. PRIME(CHECK HERE): 9b. JOINT-VENTURE PARTNER(CHECK HERE): 9b. SUBCONTRACTOR(CHECK HERE): 1 9b. FIRM NAME: 9b. IF BRANCH OFFICE CHECK HERE: I10b. ADDRESS 11b. ROLE IN THIS CONTRACT I I . STANDARD FORM 330 (62004) PAGE 1 . J BontiII&Associates RFQ#12-04-02 Page 5 ' ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1.TITLE AND LOCATION(City and State) Continuing Professional Architectural & Engineering Services 2.PUBLIC NOTICE DATE 3.SOLICITATION OR PROJECT NUMBER 04/02/2012 RFQ No. 12-04-02 '. B. ARCHITECT-ENGINEER POINT OF CONTACT 4.NAME AND TITLE Samuel N. Nifah, President & CEO 5.NAME OF FIRM • Nifah & Partners Consulting Engineers, Inc. 6.TELEPHONE NUMBER 7.FAX NUMBER - B.E-MAIL ADDRESS ' 305-386-1002 305-386-3907 snifaharliFahoartners.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) ¢Z¢ >¢ 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT e '¢°• ¢ cent Nifah and Partners 6785 S.W. 165th Ave., Structural/Civil Consulting Engineers, Suite #108, Miami, FL 33193 Engineers a. X Inc. 1 1 CHECK IF BRANCH OFFICE b. I I CHECK IF BRANCH OFFICE e. I I CHECK IF BRANCH OFFICE i d. ri CHECK IF BRANCH OFFICE e. ' I I CHECK IF BRANCH OFFICE t f. I� 1 7 CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM 0 (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (5/2004)PAGE 1 1 I • J Bonfill&Associates RFQ#12-04-02 Page 6 ' - `D.ORGANIZATIONAL CHART OF PROPOSED TEAM• City of Sunny Isles Beach Continuing Professional Architectural& Engineering Services Firms Only(CCNA)RFQ#12-04-02 Project Manager 1 J. Bonfill & t Associates Prime Consultant Principal in Charge Jacqueline Bonfill Gee Registered Architect Team Project Manager ' J. Bonfill & Associates J. Bonfill & Associates Architects,Architectural Land Surveyors& Construction Mappers Management Underground Utility ADA Title II Specialists Location t Senior Project Manager David Gee Senior Project Manager Juan J. Bonfill, PSM ' Senior CAD Designer Senior Project Manager Haydee Fernandez Salazar Eugenia Formoso, PSM Senior CAD Technician Technical Director Gonzalo Paz Oria Jannet Suarez, PSM ' Architectural AutoCAD Technicians 1 ' Vital Engineering Inc Nifah & Partners MEP& LEED Engineers Structural Engineers Senior Project Manager Senior Project Manager Electrical& LEED Nelson Samuel N. Nifah, PE Vital, PE ' Project Manager Project Manager Mechanical Ronald Duran, PE Raphael Pena Jr., PE 1 STANDARD FORM 330 16/206+) PAGE 2 I J Bonfill&Associates RFO#12-04-02 Page 7 I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE JACQUELINE BONFILL GEE TEAM PROJECT MANAGER a.TOTAL b.WITH CURRENT IPRINCIPAL IN CHARGE 26 FIRM 22 15.FIRM NAME AND LOCATION(City and State) J. BONFILL&ASSOCIATES, INC.MIAMI, FLORIDA I 16.EDUCATION(DEGREE AND SPECIALIZATION) BACHELOR OF ARCHITECTURE 7 CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) REGISTERED ARCHITECT UNIVERSITY OF MIAMI, CORAL GABLES, FLORIDA STATE OF FLORIDA AR0013685 I 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) NATIONAL COUNCIL OF ARCHITECTURAL REGISTRATION BOARDS-NCARB 42,659 • I 19. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED:2004 Shelter for Domestic Abuse Victims PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 8401 NW 27 Avenue Miami, Florida Architecture 2004 ' (3)BRIEF DESCRIPTION(Brief scope,size,cosi,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. DESCRIPTION: A 20,000 SF Shelter program included: Secure Reception Area and Intake Offices, A 40-bed Dormitory, 3 Kitchens, 2 Laundries, Nurse's office with 2 exam rooms, 2 Residents Congregating Areas, 2 employment training rooms, High Level Security Monitoring Installations, Office Facilities for a 12 person Administrative Staff. Site Improvements: 8,000 S.F. Interior Playground I Courtyard,New Entrance Driveways,Landscaping,Parking lots,Secure Perimeter Fence, Security System Site Lighting. COST: $2,900,000 ROLE: Principal in Charge (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED:2003 ' Parking Garage for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(If applicable) b. 16200 W. Dixie Highway North Miami Beach,Florida Architecture 2003 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Vehicle Storage Facility: 3-Level Parking Garage, 180,000 SF,with future expansion for 2 Additional Levels I COST: $3,200,000 ROLE: Principal in Charge (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 Miami-Dade Fire Rescue ADA Barrier Removal Project Phases I, II& Ill. PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami-Dade County,Florida Architecture 2006 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Accessibility assessment and removal of accessibility barriers at 19 Fire Rescue Stations for compliance with Miami- c. Dade County Programs #4-9201 SW 152 St. Miami, FL, #6-15890 SW 288 St Miami, FL, #8-2900 Aventura Blvd, Miami, FL,#19-650 I NW 131 St, Miami, FL, #20-13100 NE 16 Ave Miami, FL, #23-7825 SW 104 St. Miami, FL, #34-10850 SW 211 St Miami, FL, #36- 10001 Hammocks Blvd Miami, FL, #1-16699 NW 67 Ave Miami, FL, #2-6460 NW 27 Ave Miami, FL, #10-75-172 Street North Miami Beach, FL,#11-18705 NW 27 Ave Miami, FL, #21-10500 Collins Ave Miami Beach, FL, #22-15655 Biscayne Blvd Miami FL, #26-3190 NW 119 Street Miami, FL, #5-13150 Hobson Drive Homestead FL, #15-2 Crandon Blvd Key Biscayne, FL, #29-351 SW 107 Ave I Miami, FL,#38-575 NW 199 St Miami, FL. COST: $950,000 ROLE: Principal in Charge (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 Miami-Dade Fire Rescue Station#40—West Miami PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 975 SW 62nd Avenue West Miami,Florida Architecture 2006 Id. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Conversion and expansion existing residential structure into a Fire Rescue Station. Addition to existing structure included: Offices, Double apparatus Bay, Dormitories, Kitchen, Day Room,Workroom, Storage, Exercise I Room, Bathrooms.. COST: $1,150,000 ROLE: Principal in Charge (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2002 Service and Maintenance Facility for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 16250 W. Dixie Highway North Miami Beach, Florida Architecture 2002 ' (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm e. DESCRIPTION: A 4-year project that renovated the entire 20-Acre facility consisting of: Parts & Services Building Renovation: A 62,000 S.F. Office Renovation and Parts Storage Expansion with new Retail Parts Store. Conversion of existing Body Shop to new I Service Facility. New Service Drive Canopy. Structural Improvements and Re-roofing to Existing Roof Top Parking 50,000 SF. New Body Shop-16 Bays&Offices. 11,400 SF. New Prep Building:8 Bays and Overnight Parts Receiving.4,500 SF. COST: $4,600,000 ROLE: Principal in Charge AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 3 MANDATORY USE DATE OF FORM 6/2004 I J Bonfill 8 Associates RFQ 912-04-02 Page 8 E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT I (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE DAVID GEE SENIOR PROJECT MANAGER a.TOTAL b.WITH CURRENT I 25 FIRM 20 15.FIRM NAME AND LOCATION(City and State) J.BONFILL&ASSOCIATES, INC.MIAMI, FLORIDA I 16.EDUCATION(DEGREE AND SPECIALIZATION) 7 CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) BACHELOR OF SCIENCE: ARCHITECTURAL TECHNOLOGY CONSTRUCTION MANAGEMENT FLORIDA INTERNATIONAL UNIVERSITY, MIAMI, FLORIDA I18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) I19. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED:2004 Shelter for Domestic Abuse Victims PROFESSIONAL SERVICES CONSTRUCTION(Ifappmable) 1 8401 NW 27 Avenue Miami, Florida Architecture 2004 (3)BRIEF DESCRIPTION(Brie/scope,size,cost,etc)AND SPECIFIC ROLE N Check if project performed with current firm a. DESCRIPTION: A 20,000 SF Shelter program included: Secure Reception Area and Intake Offices,A 40-bed Dormitory, 3 Kitchens,2 I Laundries, Nurse's office with 2 exam rooms, 2 Residents Congregating Areas, 2 employment training rooms, High Level Security Monitoring Installations, Office Facilities for a 12 person Administrative Staff. Site Improvements: 8,000 S.F. Interior Playground • Courtyard,New Entrance Driveways,Landscaping, Parking lots,Secure Perimeter Fence, Security System Site Lighting. COST:$2,900.000 ROLE: Senior Project Manager (1)TITLE AND LOCATION(City and State) .I (2)YEAR COMPLETED:2003 Parking Garage for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(II applicable) 16200 W. Dixie Highway North Miami Beach,Florida Architecture 2003 b. (3)BRIEF DESCRIPTION(Brief scope,size,cosi,etc.)AND SPECIFIC ROLE N Check if project performed with current firm I DESCRIPTION: Vehicle Storage Facility: 3-Level Parking Garage, 180,000 SF,with future expansion for 2 Additional Levels COST: $3,200,000 ROLE: Senior Project Manager (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 I Miami-Dade Fire Rescue ADA Barrier Removal Project Phases I, II& Ill. Miami-Dade County,Florida PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Architecture 2006 (3)BRIEF DESCRIPTION(Brie/scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm c. DESCRIPTION: Accessibility assessment and removal of accessibility barriers at 19 Fire Rescue Stations for compliance with Miami- °' Dade County Programs #4-9201 SW 152 St. Miami, FL, #6-15890 SW 288 St Miami, FL, #8-2900 Aventura Blvd, Miami, FL,#19-650 NW 131 St, Miami, FL, #20-13100 NE 16 Ave Miami, FL, #23-7825 SW 104 St. Miami, FL, #34-10850 SW 211 St Miami, FL, #36- 10001 Hammocks Blvd Miami, FL, #1-16699 NW 67 Ave Miami, FL, #2-6460 NW 27 Ave Miami, FL, #10-75-172 Street North Miami Beach, FL,#11-18705 NW 27 Ave Miami, FL,#21-10500 Collins Ave Miami Beach, FL, #22-15655 Biscayne Blvd Miami FL, #26-3190 I NW 119 Street Miami, FL, #5-13150 Hobson Drive Homestead FL, #15-2 Crandon Blvd Key Biscayne, FL, #29-351 SW 107 Ave Miami, FL,#38-575 NW 199 St Miami, FL. COST: $950,000 ROLE: Senior Project Manager (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 Miami-Dade Fire Rescue Station#40—West Miami PROFESSIONAL SERVICES CONSTRUCTION(If applicable) II975 SW 62nd Avenue West Miami,Florida Architecture 2006 d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE M Check if project performed with current firm DESCRIPTION: Conversion and expansion existing residential structure into a Fire Rescue Station. I Addition to existing structure included: Offices, Double apparatus Bay, Dormitories, Kitchen, Day Room,Workroom, Storage, Exercise Room, Bathrooms.. COST: $1,150,000 ROLE: Senior Project Manager (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED: 2002 Service and Maintenance Facility for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(Itapplcable) I 16250 W. Dixie Highway North Miami Beach, Florida Architecture 2002 (3)BRIEF DESCRIPTION(Brtel scope,size,cost,etc.)AND SPECIFIC ROLE M Check if project performed with current firm e. DESCRIPTION: A 4-year project that renovated the entire 20-Acre facility consisting of: Parts & Services Building Renovation: A I 62,000 S.F. Office Renovation and Parts Storage Expansion with new Retail Parts Store. Conversion of existing Body Shop to new Service Facility. New Service Drive Canopy. Structural Improvements and Re-roofing to Existing Roof Top Parking 50,000 SF. New Body Shop-16 Bays&Offices. 11,400 SF. New Prep Building:8 Bays and Overnight Parts Receiving. 4,500 SF. COST:$4,600,000 ROLE: Senior Project Manager IAUTHORIZED FOR LOCA? REPRODUCTION STANDARD FORM 330(6/2004)PAGE 4 MANDATORY USE DATE OF FORM 6/2004 I . I J Bonfill&Associates RFC)#12-04-02 Page 9 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT I (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE HAYDEE FERNANDEZ SALAZAR SENIOR CAD DESIGNER a.TOTAL b.WITH CURRENT I 14 FIRM 13 15.ARM NAME AND LOCATION(City and State) J. BONFILL&ASSOCIATES, INC.MIAMI, FLORIDA . I 16.EDUCATION(DEGREE AND SPECIALIZATION) 7 CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) BACHELOR OF ARCHITECTURE UNIVERSITY OF MIAMI, CORAL GABLES,FLORIDA I18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training.Awards,etc.) 19. RELEVANT PROJECTS I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED:2004 Shelter for Domestic Abuse Victims PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 8401 NW 27th Avenue Miami, Florida Architecture 2004 I (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a. DESCRIPTION: A 20,000 SF Shelter program included:-Secure Reception Area and Intake Offices,A 40-bed Dormitory, 3 Kitchens,2 • Laundries, Nurse's office with 2 exam rooms, 2 Residents Congregating Areas, 2 employment training rooms, High Level Security Monitoring Installations, Office Facilities for a 12 person Administrative Staff. Site Improvements: 8,000 S.F. Interior Playground I Courtyard,New Entrance Driveways, Landscaping,Parking lots,Secure Perimeter Fence, Security System Site Lighting. COST:52,900,000 ROLE: Senior CAD Designer (1)TITLE AND LOCATION(City and State) I (2)YEAR COMPLETED:2003 Parking Garage for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(If applicable) b. 16200 W. Dixie Highway North Miami Beach, Florida Architecture 2003 (3)BRIEF DESCRIPTION(Brief scope.size,cost,etc.)AND SPECIFIC ROLE • IA Check if project performed with current firm DESCRIPTION: Vehicle Storage Facility: 3-Level Parking Garage, 180,000 SF,with future expansion for 2 Additional Levels I COST: $3,200,000 ROLE: Senior CAD Designer (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 Miami-Dade Fire Rescue ADA Barrier Removal Project Phases I, II& Ill. PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami-Dade County, Florida Architecture 2006 (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Accessibility assessment and removal of accessibility barriers at 19 Fire Rescue Stations for compliance with Miami- c. Dade County Programs#4-9201 SW 152 St. Miami, FL,#6-15890 SW 288 St Miami, FL, #8-2900 Aventura Blvd, Miami, FL, #19-650 I NW 131 St, Miami, FL, #20-13100 NE 16 Ave Miami, FL, #23-7825 SW 104 St. Miami, FL, #34-10850 SW 211 St Miami, FL, #36- 10001 Hammocks Blvd Miami, FL, #1-16699 NW 67 Ave Miami, FL, #2-6460 NW 27 Ave Miami, FL, #10-75-172 Street North Miami Beach, FL, #11-18705 NW 27 Ave Miami, FL,#21-10500 Collins Ave Miami Beach, FL, #22-15655 Biscayne Blvd Miami FL, #26-3190 NW 119 Street Miami, FL, #5-13150 Hobson Drive Homestead FL, #15-2 Crandon Blvd Key Biscayne, FL, #29-351 SW 107 Ave I Miami,FL,#38-575 NW 199 St Miami, FL. COST: $950,000 ROLE: Senior CAD Designer (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 Miami-Dade Fire Rescue Station#40—West Miami PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 975 SW 62n°Avenue West Miami,Florida Architecture 2006 Id. (3)BRIEF DESCRIPTION(Brief scope.size,cost,etc)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Conversion and expansion existing residential structure into a Fire Rescue Station. Addition to existing structure included: Offices, Double apparatus Bay, Dormitories, Kitchen, Day Room, Workroom, Storage, Exercise I Room, Bathrooms.. COST: $1,150,000 ROLE: Senior CAD Designer (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2002 Service and Maintenance Facility for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 16250 W. Dixie Highway North Miami Beach, Florida Architecture • 2002 I (3)BRIEF DESCRIPTION(Brief scope.size,cost,etc)AND SPECIFIC ROLE ® Check if project performed with current firm e. DESCRIPTION: A 4-year project that renovated the entire 20-Acre facility consisting of: Parts & Services Building Renovation: A 62,000 S.F. Office Renovation and Parts Storage Expansion with new Retail Parts Store. Conversion of existing Body Shop to new I Service Facility. New Service Drive Canopy. Structural Improvements and Re-roofing to Existing Roof Top Parking 50,000 SF. New Body Shop-16 Bays&Offices. 11,400 SF. New Prep Building:8 Bays and Overnight Parts Receiving. 4,500 SF. COST:$4,600,000 ROLE: Senior CAD Designer IAUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 5 MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill 8 Associates RFQ#12-04-02 Page 10 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT I (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE • GONZALO PAZ SENIOR CAD TECHNICIAN a.TOTAL b.WITH CURRENT I 20 FIRM 13 15.FIRM NAME AND LOCATION(City and State) J.BONFILL&ASSOCIATES, INC.MIAMI, FLORIDA I 16.EDUCATION(DEGREE AND SPECIALIZATION) 7 CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) BACHELOR OF SCIENCE-CIVIL& STRUCTURAL ENGINEERING UNIVERSITY OF HAVANA, CUBA 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) 19. RELEVANT PROJECTS (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED:2004 Shelter for Domestic Abuse Victims PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 8401 NW 27th Avenue Miami, Florida Architecture 2004 i (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm a' DESCRIPTION: A 20,000 SF Shelter program included: Secure Reception Area and Intake Offices,A 40-bed Dormitory, 3 Kitchens, 2 Laundries, Nurse's office with 2 exam rooms, 2 Residents Congregating Areas, 2 employment training rooms, High Level Security Monitoring Installations, Office Facilities for a 12 person Administrative Staff. Site Improvements: 8,000 S.F. Interior Playground I Courtyard,New Entrance Driveways,Landscaping, Parking lots,Secure Perimeter Fence, Security System Site Lighting. COST:$2,900,000 ROLE: Senior CAD Technician (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED:2003 Parking Garage for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(If applicable) I b. 16200 W. Dixie Highway North Miami Beach,Florida Architecture 2003 (3)BRIEF DESCRIPTION(Brief scope.size,cost,etc.)AND SPECIFIC ROLE E Check if project performed with current firm DESCRIPTION: Vehicle Storage Facility: 3-Level Parking Garage, 180,000 SF,with future expansion for 2 Additional Levels I COST: $3,200,000 ROLE: Senior CAD Technician (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 • Miami-Dade Fire Rescue ADA Barrier Removal Project Phases I, II & III. PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami-Dade County,Florida Architecture 2006 II (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Accessibility assessment and removal of accessibility barriers at 19 Fire Rescue Stations for compliance with Miami- ' Dade County Programs #4-9201 SW 152 St. Miami, FL, #6-15890 SW 288 St Miami, FL, #8-2900 Aventura Blvd, Miami, FL,#19-650 I NW 131 St, Miami, FL, #20-13100 NE 16 Ave Miami, FL, #23-7825 SW 104 St. Miami, FL, #34-10850 SW 211 St Miami, FL, #36- 10001 Hammocks Blvd Miami, FL, #1-16699 NW 67 Ave Miami, FL, #2-6460 NW 27 Ave Miami, FL, #10-75-172 Street North Miami Beach, FL, #11-18705 NW 27 Ave Miami, FL, #21-10500 Collins Ave Miami Beach, FL, #22-15655 Biscayne Blvd Miami FL,#26-3190 NW 119 Street Miami, FL, #5-13150 Hobson Drive Homestead FL, #15-2 Crandon Blvd Key Biscayne, FL, #29-351 SW 107 Ave I Miami, FL,#38-575 NW 199 St Miami, FL. COST: $950,000 ROLE: Senior CAD Technician (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2006 Miami-Dade Fire Rescue Station#40—West Miami PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 975 SW 62nd Avenue West Miami,Florida Architecture 2006 I d. (3)BRIEF DESCRIPTION(Brief scope.size,cost,etc.)AND SPECIFIC ROLE ® Check project performed with current firm DESCRIPTION: Conversion and expansion existing residential structure into a Fire Rescue Station. Addition to existing structure included: Offices, Double apparatus Bay, Dormitories, Kitchen, Day Room,Workroom, Storage, Exercise I Room, Bathrooms.. COST: $1,150,000 ROLE: Senior CAD Technician (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2002 Service and Maintenance Facility for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 16250 W. Dixie Highway North Miami Beach, Florida Architecture 2002 I (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE .N Check if project performed with current firm e' DESCRIPTION: A 4-year project that renovated the entire 20-Acre facility consisting of:• Parts & Services Building Renovation: A 62,000 S.F. Office Renovation and Parts Storage Expansion with new Retail Parts Store. Conversion of existing Body Shop to new I Service Facility. New Service Drive Canopy. Structural Improvements and Re-roofing to Existing Roof Top Parking 50,000 SF. New Body Shop-16 Bays& Offices. 11,400 SF. New Prep Building:8 Bays and Overnight Parts Receiving. 4,500 SF. COST: $4,600,000 ROLE: Senior CAD Technician AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 6 MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill&Associates RFQ#12-04-02 Page 11 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAMS ' 20.EXAMPLE PROJECT KEY ' QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 1 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2004 Shelter for Domestic Abuse Victims 8401 NW 27th Avenue Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 2001-2004 2004 23. PROJECT OWNER'S INFORMATION Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Duanne Kopp, PE 305-375-2694 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) I A 20,000 S.F. Shelter for Victims of Domestic Abuse. Program included: Secure Reception Area and Intake Offices A 40-bed Dormitory I 3 Kitchens, 2 Laundries Nurse's office with 2 exam moms 2 Congregating Areas for Residents Two employment training rooms for residents I High Level Security and Monitoring Installations Offices and Facilities for a 12 person Administrative Staff Site Improvements included: I 8,000 S.F. Interior Playground Courtyard with covered terraces. New Entrance Driveways, Landscaping,Parking lots and accessible parking areas,accessible routes and ramps. • Secure Perimeter Fence,Security System Site Lighting. Scope of Professional Services: I . Architectural, Structural,Mechanical, Electrical, Plumbing,Civil Engineering 8 Surveying. Deliverables 8 Services: Boundary Survey,As Built of existing conditions I Design proposed changes Equipment and Building Component Selection and Specification Production of construction documents Coordination with Engineering Consultants IPermitting, Bidding Package and Award of Contract Construction Administration: Inspections,Contract Close-out, Punch list, Final As-Builts Construction Cost: $2,900,000 I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. ' (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE ' I e (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 7 MANDATORY USE DATE OF FORM 6/2004 J Bonfill&Associates RFQ#12-04-02 Page 12 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified. 2 Complete one Section F for each project.) 21.TITLE AND LOCATION(Cityand State) 22.YEAR COMPLETED 2003 Parking Garage for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 16200 W. Dixie Highway North Miami Beach, Florida 2002-2003 2003 23. PROJECT OWNER'S INFORMATION Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Friendly Ford Tom Strickland, Suncoast Autobuilders 727-561-0764 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) 1 Vehicle Storage Facility: 3-Level Parking Garage, 180,000 SF,with future expansion for 2 Additional Levels 1 Used Car Showroom:A 3,000 SF Showroom at Ground Level Services included Architectural,Structural, Mechanical, Electrical, Plumbing and Civil Engineering,Surveying, Environmental Impact Studies, Site Development including Zoning Variances and DERM Variances. I Boundary Survey,As Built of existing conditions Design proposed changes Equipment and Building Component Selection and Specification Production of construction documents for proposed improvements Coordination with Engineering Consultants Construction Sequencing Permitting Construction Administration I Inspections, Contract Close-out, Punch list, Final As-Built Construction Cost: $3,200,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. i (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. I I I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 8 MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill&Associates RPO#12-04-02 Page 13 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 3 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) . 22.YEAR COMPLETED 2006 Miami-Dade Fire Rescue ADA Barrier Removal Project Phases I, II&III. PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami-Dade County,Florida 2001-2005 2006 I23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Fire Rescue Department Alfonso Ledo 786-331-4503 I 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Accessibility assessment and removal of accessibility barriers at Fire Rescue Stations for Compliance with Miami-Dade County Programs. ADA Barrier Removal Project Phase I: Start date: 01-2001 Completion date: 05-2003 Station#4 Coral Reef 9201 SW 152 St. Miami; FloridaI Station#6 Modello 15890 SW 288 St Miami, Florida Station#8 Aventura 2900 Aventura Blvd,Miami, Florida Station#19 North Miami West 650 NW 131 St,Miami, Florida Station#20 North Miami East 13100 NE 16 Ave Miami, Florida I Station#23 Kendall-South 7825 SW 104 St. Miami, Florida Station#34 Cutler Ridge 10850 SW 211 St Miami, Florida Station#36 Hammocks 10001 Hammocks Blvd Miami, Florida ADA Barrier Removal Project Phase II: Start date: 09-2001 Completion date: 12-2003 I Station#1 Miami Lakes 16699 NW 67 Ave Miami, Florida Station#2 Model Cities 6460 NW 27 Ave Miami, Florida Station#10 Sunny Isles 75-172 Street North Miami Beach, Florida Station#11 Carol City 18705 NW 27 Ave Miami, Florida I Station#21 Haulover 10500 Collins Ave Miami Beach, Florida Station#22 Interama 15655 Biscayne Blvd Miami Florida Station#26 Opa Locka 3190 NW 119 Street Miami, Florida ADA Barrier Removal Project Phase III: Start date: 01-2005 Completion date: 08-2005 Station#5 Princeton 13150 Hobson Drive Homestead Florida I Station#15 Key Biscayne 2 Crandon Blvd Key Biscayne, Florida Station#29 Sweetwater 351 SW 107 Ave Miami, Florida Station#38 Golden Glades 575 NW 199 St Miami, Florida Scope of Work: Architectural, Structural,Mechanical, Electrical, Plumbing and Civil Engineering, Surveying,Accessibility Waiver from the I State of Florida. Boundary Survey,As Built of existing conditions. Design proposed changes Equipment and Building Component Selection and Specification I Production of construction documents Coordination w/Engineering Consultants Coordination with permitting agencies Bidding Package and Award of Contract - I Construction Administration: Inspections,Contract Close-out, Punch list, Final As-Built Construction Costs: $950,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 1 a. (1)FIRM NAME . (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE ' c (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d (1)FIRM NAME (2)FIRM LOCATION(City and State) • (3)ROLE e (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 9 MANDATORY USE DATE OF FORM 6/2004 I J Bonfill 8 Associates RFC)#12-04-02 Page 14 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 4 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2006 I Miami-Dade Fire Rescue Station#40—West Miami PROFESSIONAL SERVICES CONSTRUCTION(llapp'icade) 975 SW 62ne Avenue West Miami, Florida 2002-2006' 2006 I23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Edward Villareal 786-331-4509 I24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cosi) Conversion and expansion existing residential structure into a Fire Rescue Station. I Addition to existing structure included: Offices Double Apparatus Bay Dormitories Kitchen Day Room Workroom Storage Exercise Room Bathrooms I Site Improvements included: Parking lot,accessible parking area,accessible routes and ramps. I Secure Perimeter Fence,Security System, Site Lighting. New Entrance Driveways, Landscaping, Irrigation,Utilities. Scope of Work: I Architectural,Structural,Mechanical, Electrical, Plumbing and Civil Engineering, Surveying,Accessibility Waiver from the State of Florida. Boundary Survey,As Built of existing conditions Design proposed changes Equipment and Building Component Selection and Specification Production of construction documents Coordination w/Engineering Consultants Coordination with permitting agencies - I Bidding Package and Award of Contract . Construction Administration: Inspections,Contract Close-out, Punch list, Final As-Built Approximate Cost: $1,150,000 I25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME _ (2)FIRM LOCATION(City and State) (3)ROLE a. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. .11 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. ' (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I f. I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 10 MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill&Associates RFQ#12-04-02 Page 15 .' F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 5 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2002 I Service and Maintenance Facility for Ford Dealership PROFESSIONAL SERVICES CONSTRUCTION(Irappacade) 16250 W. Dixie Highway North Miami Beach, Florida 2000-2002 2002 23. PROJECT OWNER'S INFORMATION Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Friendly Ford Tom Strickland, Suncoast Autobuilders 727-561-0764 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope.size,and cost) IA 4 year project that renovated the entire 20-Acre facility consisting of: Parts 8 Services Building Renovation: A 62,000 S.F. Office Renovation and Parts Storage Expansion with new Retail Parts Store. Conversion of existing Body Shop to new Service Facility New Service Drive Canopy Structural Improvements and Re-roofing to Existing Roof Top Parking 50,000 S.F. INew Body Shop. 16 Bays 8 Offices. 11,400 S.F. I New Prep Building:8 Bays and Overnight Parts Receiving.4,500 S.F. Services included: Architectural, Structural,Mechanical, Electrical, Plumbing,Civil Engineering, Surveying, Environmental Impact Studies. Site Development including Zoning Variances and DERM Variances. I Deliverables and Services included: Boundary Survey,As Built of existing conditions Design proposed changes I Equipment and Building Component Selection and Specification Production of construction documents for proposed improvements Coordination with Engineering Consultants Construction Sequencing I Permitting Construction Administration: Inspections, Contract Close-out, Punch list, Final As-Built Construction Cost: 54,600,000 I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. 1 (1)FIRM NAME , (2)FIRM LOCATION(City and State) (3)ROLE C. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE . I e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE 1 ( I■, AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 11 MANDATORY USE DATE OF FORM 612004 • 1 I J Bonfill 8 Associates RFQ#12-04-02 Page 16 I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 6 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2006 1 Design Criteria Professionals for Miami-Dade Fire Rescue Station#58—Tamiami PROFESSIONAL SERVICES CONSTRUCTION(If app xable) 12700 SW 6th Street Miami, Florida 2002-2005 2006 23. PROJECT OWNER'S INFORMATION Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Jesus Farinas 786-331-4507 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size.and cost) New 7,400 SF Fire Rescue Station - Program included: Double Apparatus Bay • Dormitories • Offices • Kitchen • Day Room • Workroom • Storage • Exercise Room • Bathrooms Site Improvements included: Coordination with new Drainage Pump located at the adjacent DERM Easement South Florida Water Management's Easement for Canal Maintenance Parking lots and accessible parking areas,accessible routes and ramps. Secure Perimeter Fence,Security System Site Lighting. 1 New Entrance Driveways, Landscaping. Scope of Work: Design Criteria Professionals in charge of preparing Design Criteria Documents to be used by Design Build Firms. Evaluating proposer's submissions on Miami-Dade Fire Rescue Department behalf I Coordination with permitting agencies Construction administration and Evaluation Construction Cost: 51,700,000 1 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (I)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. 1 (1)FIRM NAME • (2)FIRM LOCATION(City and State) (3)ROLE b. .1 (1)FIRM NAME (2)FIRM LOCATION(Cityand State) (3)ROLE c. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE Id. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE. 1 f. II AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 12 MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill 8 Associates RFO#12-04-02 Page 17 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. 7 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 1 North West Community Center PROFESSIONAL SERVICES CONSTRUCTION(It applicable) NW 2n0 Avenue 8 NW 160th Street Miami, Florida 2011-2012 N/A 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Coconut Grove Collaborative J.S. Rashid 305-733-9521 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) ICommunity Center including: 3,000 SF Public Assembly Space 1 Learning Center Offices Approximately 20,000 SF Scope of Work: I Preliminary Design consisting of: Site Plan, Floor Plans, Elevations. Zoning Hearing documentation: IIncluding research,calculations, parking design. Estimated Construction Cost: $2,300,000 • I25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. I (1)FIRM NAME (2)FIRM LOCATION(City and State) I (3)ROLE d. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and Slate) (3)ROLE If I I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 13 MANDATORY USE DATE OF FORM 6/2004 I . J Bonfill 8 Associates RR)#12-04-02 Page 18 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,orf 0 projects,if not specified. 8 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2008 Europa Biscayne Restaurant PROFESSIONAL SERVICES CONSTRUCTION(it applicable) 620 NE 21s'Street Miami,Florida 2007-2008 2008 i23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Europa Biscayne Renato Mariani 305-904-1377 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Description: Conversion of existing gas station&auto repair shop into new car wash&restaurant. Utility&site improvements: new ingress/egress drives from Biscayne Blvd. New oil&sand separator,new employee bathroom, restaurant seating&equipment. Change of use reviews by Dept of Business Regulation, HRS&Agriculture Department. Services Provided by our firm included: As-Built of existing conditions ADA assessment ' Construction Documents Landscaping Design Programming&Design Permitting Bidding&Contract award Construction Coordination Landscaping inspection ' shop drawing review, Inspections Close-out and Final As-Built • Estimated Construction Cost: $450,000 1 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE ' c. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE 1 d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. 1 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 14 MANDATORY USE DATE OF FORM 6/2004 1 I J Bonfill 8 Associates RFQ#12-04-02 Page 19 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 9 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEARCOMPLETED 2003 Coral Springs KIA-Coral Springs Auto Mall PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 9320 W Atlantic Boulevard Coral Springs, Florida 2002-2003 2003 I . 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME . c.POINT OF CONTACT TELEPHONE NUMBER Coral Springs KIA Tom Strickland,Suncoast Autobuilders 727-561-0764 I24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Description: New 4,000 SF Automotive Showroom and Offices for Coral Springs KIA located at Coral Springs Auto Mall, Coral Springs, Florida. I Professional Services included: Architectural • Structural I Mechanical Electrical Plumbing Civil Engineering ISite Development including vehicle display and storage Deliverables and Services included I Design of Facilities and Site Improvements • Equipment and Building Component Selection and Specification Production of construction documents for proposed improvements Coordination with Engineering Consultants I Construction Sequencing Permitting Construction Administration Inspections,Contract Close-out, Punch list, Final As-Built 1 Estimated Construction Cost: $450,000 I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. I (1)FIRM NAME• (2)FIRM LOCATION(City and State) (3)ROLE . b. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I e. • (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. 1 I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 15 MANDATORY USE DATE OF FORM 6/2004 • I 1 J Bonfill&Associates RFQ#12-04-02 Page20 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 10 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2008 1 Legacy Development Office Condominiums PROFESSIONAL SERVICES CONSTRUCTION(Ifapplicable) 7245 SW 87th Avenue Miami, Florida 2007-2008 2008 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Legacy Development Armando Sotolongo 305-630-3733 B24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Project Description: Adapt 2 condominium units into 4 units. Demolish existing improvements and provide new ADA compliant accessible bathrooms, kitchen and employee lounge. Specification of new compliant hardware,fixtures,signage. Barrier removal&accessible route from parking area, upgrade accessible parking spaces,striping, ramps, etc. Interior improvements included new partitions,finishes, mezzanine, mechanical, electrical, plumbing, means of egress,ADA barrier removal,and accessible route. 6,000 SF. Services Provided by our firm included: As Built of Space including Electrical and Mechanical Systems, Programming, Design,Preliminary design including furniture&equipment layout, Construction Documents consisting of architectural,structural,mechanical,electrical&plumbing, Equipment selection& specification, Consultant coordination Permitting, Construction Coordination,Construction sequencing, Construction document services including inspections,review of shop drawings, Contract close-out,As-Built documents. Estimated Construction Cost: $450,000 1 • • 1 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE _ 1 d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. 1 ' AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(5/2004)PAGE 16 MANDATORY USE DATE OF FORM 6/2004 1 I • J Bonfill&Associates RFO#12-04-02 Page 21 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS I 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in"Example Projects Key'section below before completing (From Section E, (From Section E, table. Place'X'under project key number fdr I Block 12) Block 13) participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Jacqueline Bonfill Gee Principal in Charge-Architect of X X X X X X X X X X Record David Gee Senior Project Manager X X X X X X XXXX Haydee Fernandez Salazar Senior CAD Designer X X X X X X XXXX Gonzalo Paz Senior CAD Technician X X X X X X X XXX I I I I I I . I ' 29. EXAMPLE PROJECTS KEY I NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) 1 Shelter for Victims of Domestic Abuse 6 Design Criteria Professionals for Miami-Dade County Fire Rescue Station#58 I2 Parking Garage for Ford Dealership 7 North West Community Center 3 Miami-Dade Fire Rescue ADA Barrier Removal 8 Europa Biscayne Restaurant Project Phases I, II & Ill 1 4 Miami-Dade Fire Rescue Station #40 g Coral Springs KIA Automotive Showroom 5 Service and Maintenance Facilities for.Ford 10 Legacy Development Office Condominiums 1 Automotive Dealership I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE 17 MANDATORY USE DATE OF FORM 6/2004 I I J Bonfll 8 Associates RFQ 612-04-02 Page 22 I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE JUAN J.BONFILL LAND SURVEYOR OF RECORD a.TOTAL b.WITH CURRENT 42 FIRM 22 15.FIRM NAME AND LOCATION(City and State) J.BONFILL&ASSOCIATES, INC.MIAMI, FLORIDA I16.EDUCATION(DEGREE AND SPECIALIZATION) 7 CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) BACHELOR'S DEGREE- ENGINEERING REGISTERED LAND SURVEYOR& MAPPER SANTIAGO DE CUBA INSTITUTE, CUBA STATE OF FLORIDA IPSM#3179 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) CERTIFIED GENERAL CONTRACTOR, STATE OF FLORIDA CGC#020513(INACTIVE) I 19. RELEVANT PROJECTS I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED 2003 Fairlawn, Flagami&West End Storm Sewer Drainage Projects PROFESSIONAL SERVICES CONSTRUCTION(If applicable) City of Miami, Florida LAND SURVEYING N/A a. (3)BRIEF DESCRIPTION(Brief scpe,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm I DESCRIPTION: Topographic Right of Way Survey for Storm Sewer Drainage Project. Fairlawn: Flagler St to NW 7 St&NW 57 Ave to NW 52 Ave(27,920 I.f.); Flaoami: Flagler St to SW 8 St&SW 67 Ave to SW 62 Ave(39,750 I.f.);West End: Flagler St to Tamiami Canal Rd&NW 69 Ave to NW 62 Ave(32,520 I.f.) Total RAN: 100,190 Iin.ft. COST: $150,300 ROLE:Surveyor of Record • I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED:2006 Bayfront Park&Rock Garden PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, Florida LAND SURVEYING N/A I b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Boundary Survey for 32-Acre Park Site and a Specific Topographic Survey of Bayfront Park's Rock Garden,approx. 6.3-Acres. Water marking lines,complete R/W of N. Biscayne Blvd and Miamarina Parkway Dr., all Buildings and Temporary Structures,Trees, Elevations, Utilities,sketch and legal description for new water mains.COST: S32,380 ROLE: Surveyor of Record I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2003 FEMA Road Restoration Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, Florida LAND SURVEYING N/A Ic. (3)BRIEF DESCRIPTION(Brief scope.size.cost,etc.)AND SPECIFIC ROLE Ni Check if project performed with current firm DESCRIPTION: Topographic Right of Way Surveys for the County-wide Design Surveys for Drainage and Road Restoration approximately 165,918 lineal feet of R/W located along 113 locations(public roadways)including cross sections @100',all above Iground utilities, trees,drainage&sewer structures, roadway centerlines. COST: $402,535 ROLE: Surveyor of Record (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2007 FEC Borrow Ditch Canal Dredging PWD Project Number 20070624 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) IMiami, Florida LAND SURVEYING N/A d. (3)BRIEF DESCRIPTION(Brief sage,size,cost,etc)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Topographic Survey of the FEC Canal from NW 36th St to N. Royal Poinciana Blvd Miami, FL. Canal Cross Sections I &Sediment Depths for apprx. 13,600 I.f.,Cross Sections @100',Cross Sections 50' upstream&downstream from embankment failure,top of sediment, hard bottom @ 5',all above ground features, R/W,easements.COST: $110,300 ROLE: Surveyor of Record (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2007 I Medical School-University Park, Florida International University Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(If applcable) LAND SURVEYING N/A e (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Specific Topographic Survey of 49-acre site for New Medical School. Including:permanent&temporary buildings, I adjacent lake area, parking, R/W,tree location&identification, complete utilities,fences,walkways,curbs,asphalt areas, temporary bench marks(TBM)referenced to Florida State Plane Coordinates System Grid. COST: $22,100 ROLE: Surveyor of Record 1 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(62004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill&Associates RFO 512-04-02 Page 23 IE. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE EUGENIA FORMOSO REGISTERED LAND SURVEYOR a.TOTAL b.WITH CURRENT I SENIOR PROJECT MANAGER 25 20 15.FIRM NAME AND LOCATION(City and State) FIRM J. BONFILL&ASSOCIATES, INC.MIAMI, FLORIDA I 16.EDUCATION(DEGREE AND SPECIALIZATION) CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) BACHELOR OF ARCHITECTURE REGISTERED LAND SURVEYOR&MAPPER SANTIAGO DE CUBA SUPERIOR POLYTECHNIC INSTITUTE STATE OF FLORIDA IP.S.M. #6660 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) 19. RELEVANT PROJECTS (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED:2003 1 Fairlawn, Flagami&West End Storm Sewer Drainage Projects City of Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(If appcable) LAND SURVEYING N/A a. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm I DESCRIPTION:Topographic Right of Way Survey for Storm Sewer Drainage Project. Fairlawn: Flagler St to NW 7 St& NW 57 Ave to NW 52 Ave(27,920 I.f.); Flaciami: Flagler St to SW 8 St&SW 67 Ave to SW 62 Ave(39,750 I.f.);West End: Flagler St to Tamiami Canal Rd &NW 69 Ave to NW 62 Ave(32,520 I.1.) Total RM: 100,190 lin.ft. COST: $150,300 ROLE: Project Coordinator I (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED:2006 Bayfront Park & Rock Garden PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, Florida LAND�rr77SURVEYING N/A �y b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE Check if project performed with current firm I DESCRIPTION: Boundary Survey for 32-Acre Park Site&Specific Topographic Survey of 6.3-acre Bayfront Park's Rock Garden, Water marking lines,complete RAN of N. Biscayne Blvd&Miamarina Parkway Dr., all buildings&temporary structures, trees, elevations,utilities, sketch and legal description for new water mains.COST: $32,380 ROLE: Project Coordinator I (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED: 2003 FEMA Road Restoration Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, Florida LAND SURVEYING N/A c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Topographic Right of Way Surveys for the County-wide Design Surveys for Drainage and Road Restoration approximately 165,918 lineal feet of RNV located along 113 locations(public roadways)including cross sections @100',all above ground utilities, trees,drainage&sewer structures,roadway centerlines. COST: $402,535 ROLE: Project Coordinator I (1)TIRE AND LOCATION(City and State) ' (2)YEAR COMPLETED: 2007 FEC Borrow Ditch Canal Dredging PWD Project Number 20070624 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) IMiami, Florida LAND SURVEYING N/A d. (3)BRIEF DESCRIPTION(Brief scope.size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Topographic Survey of the FEC Canal from NW 36th St to N. Royal Poinciana Blvd Miami, FL. Canal cross sections& sediment depths for apprx. 13,600 I.f.,cross sections @100',cross sections 50'upstream &downstream from embankment failure,top Iof sediment,hard bottom @ 5,all above ground features, RNV,easements. COST: $110,300 ROLE: Project Coordinator (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED: 2007 Medical School-University Park, Florida International University PROFESSIONAL SERVICES CONSTRUCTION(If applicable) I Miami, Florida LAND SURVEYING N/A e (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Specific Topographic Survey of 49-acre site for New Medical School. Including:permanent&temporary buildings, I adjacent lake area, parking, RJW,tree location&identification,complete utilities, fences,walkways,curbs,asphalt areas, temporary bench marks(TBM)referenced to Florida State Plane Coordinates System Grid. COST: $22,100 ROLE: Project Coordinator IAUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6r2oo4)PAGE MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill 8 Associates RFQ#12-04-02 Page 24 IE.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE JANNET SUAREZ DOCUMENT CONTROL a.TOTAL ' b.WITH CURRENT I SENIOR AUTOCAD TECHNICIAN 22 FIRM 17 15.FIRM NAME AND LOCATION(City and Slate) J.BONFILL&ASSOCIATES, INC.MIAMI, FLORIDA I 16.EDUCATION(DEGREE AND SPECIALIZATION) 7 CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) BACHELOR OF ARCHITECTURE REGISTERED LAND SURVEYOR&MAPPER UNIVERSITY OF VENEZUELA, CARACAS,VENEZUELA STATE OF FLORIDA IP.S.M. #6781 18.OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations,Training,Awards,etc.) I 19. RELEVANT PROJECTS I (1)TIRE AND LOCATION(City and Slate) (2)YEAR COMPLETED 2003 Fairlawn, Flagami&West End Storm Sewer Drainage Projects PROFESSIONAL SERVICES CONSTRUCTION(Ilapplicable) City of Miami, Florida LAND SURVEYING N/A a. (3)BRIEF DESCRIPTION(Briefscope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm IDESCRIPTION: Topographic Right of Way Survey for Storm Sewer Drainage Project. Fairlawn: Flagler St to NW 7 St& NW 57 Ave to NW 52 Ave(27,920 I.f.); Flagami: Flagler St to SW 8 St& SW 67 Ave to SW 62 Ave(39,750 If.);West End: Flagler St to Tamiami Canal Rd&NW 69 Ave to NW 62 Ave(32,520 I.f.) Total RAN: 100,190 lin.ft. COST: $150,300 ROLE:Senior AutoCAD Technician I (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED:2006 P Bayfront Park & Rock Garden ROFESSIONAL SERVICES CONSTRUCTION(II applicable) Miami, Florida LAND SURVEYING N/A I b. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Boundary Survey for 32-Acre Park Site&Specific Topographic Survey of 6.3-acre Bayfront Park's Rock Garden, Water marking lines,complete RM of N. Biscayne Blvd& Miamarina Parkway Dr.,all buildings&temporary structures,trees, elevations,utilities,sketch and legal description for new water mains.COST: $32,380 ROLE: Senior AutoCAD Technician I (1)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED: 2003 FEMA Road Restoration Project PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, Florida LAND SURVEYING N/A I c. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Topographic Right of Way Surveys for the County-wide Design Surveys for Drainage and Road Restoration approximately 165,918 lineal feet of RNV located along 113 locations (public roadways)including cross sections @100',all above Iground utilities, trees,drainage&sewer structures, roadway centerlines. COST: $402,535 ROLE: Senior AutoCAD Technician (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED: 2007 FEC Borrow Ditch Canal Dredging PWD Project Number 20070624 PROFESSIONAL SERVICES CONSTRUCTION(I7 applicable) ' Miami, Florida LAND SURVEYING N/A d. (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE ® Check if project performed with current firm DESCRIPTION: Topographic Survey of the FEC Canal from NW 36'"St to N.Royal Poinciana Blvd Miami, FL. Canal cross sections& I sediment depths for apprx. 13,600 II., cross sections @100',cross sections 50'upstream &downstream from embankment failure,top of sediment,hard bottom @ 5', all above ground features, RPM, easements.COST: $110,300 ROLE: Senior AutoCAD Technician (1)TIRE AND LOCATION(City and State) (2)YEAR COMPLETED: 2007 Medical School-University Park, Florida International University PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, Florida LAND SURVEYING N/A e (3)BRIEF DESCRIPTION(Brief scope.size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm DESCRIPTION: Specific Topographic Survey of 49-acre site for New Medical School. Including: permanent&temporary buildings, ' adjacent lake area, parking,RNV, tree location&identification,complete utilities,fences,walkways,curbs,asphalt areas, temporary bench marks(TBM)referenced to Florida State Plane Coordinates System Grid. COST: $22,100 ROLE: Senior AutoCAD Technician ' AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(612004)PAGE MANDATORY USE DATE OF FORM 612004 I J Bonfll 8 Associates RFC)#12-04-02 Page 25 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects,if not specified. 01 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2008 IMiami Central Senior High School PROFESSIONAL SERVICES CONSTRUCTION(If applicable) 1781 NW 95th Street Miami, Florida Land Surveying N/A 1PROJECT OWNER 23. PROJECT OWNER'S INFORMATION a. b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Public Schools Shari Lee, Director (305)995-1446 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) IScope of Work: Complete Land Surveying Services for 35-Acre School Site, including but not limited to: , Boundary Survey I Tree Survey GPS Location of Utilities including Ground Penetration Radar(GPR)report • Topographic Survey I Sketch and Legal Description of Easements Specific Purpose Survey of Streets adjacent to School,approximately 3,800 LF of Right of Way Cut-out Surveys for new buildings Title Search Reports I Construction Surveying Services(Layouts)of all new buildings and site improvements Fees paid to firm: 5109,400 Project Start Date: 04/2006 Completion Date: 12/2008 ITotal time of construction: Estimated: N/A - Actual: N/A Total cost of construction: Estimated: N/A - Actual: N/A IClient Information: Miami-Dade County Public Schools Facilities Support Services Office of Capital Improvements 1 1450 Northeast Second Avenue, Room 226 Miami, FL Shari Lee,Director Phone: (305)995-1446 E-mail: salee@dedeschools.net I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE 1 b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE If . AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill&Associates RFQ#12-04-02 Page 26 IF.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency,or 10 projects, if not specified. NUMBER02 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED: 2007 FEC Borrow Ditch Canal Dredging PWD Project Number 20070624 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, Florida Land Surveying N/A 23. PROJECT OWNER'S INFORMATION Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade County Bassam , Moubayed,C.F.M.Manager 305-375-2111 • 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) 1 DESCRIPTION: Topographic Survey of the FEC Canal from NW 36r"Street to N. Royal Poinciana Boulevard Miami, Florida Canal Cross Sections and Sediment Depths for approximately 13,600 lineal feet I COST: Professional Fees: $110,300 SCOPE OF WORK: The following information was provided in our Survey; • Canal Cross Sections at 100'intervals, including the segments from the top of the bank to the end of the Canal RIW • Iand easement limits • Cross Sections 50'upstream and downstream from the embankment failure area • Cross section information provide in scale of H:1'=10'and V:1'=10' I • Points taken at the cross sections spaced at 5'intervals • Existing bottom-(top of sediment)and side slope elevation, probing to refusal to determine canal hard bottom(original bottom) • Depth of sediment at each point • Values of the hard bottom and top of sediment elevations at 5'intervals across the canal Survey of above ground features: landscaping, poles,roadways,curbs,guardrails, headwalls,sheds located within the canal RNV and easement limits • County RAN and easements limits,canal centerline,Baseline,Section-line. Total fees paid to firm: $110,300 Project Start Date: 04/2007 Completion Date: 06/2007 I Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A Client Information: Miami Dade County Public Works-Construction Division Bassam,Moubayed,C.F.M. Manager 111 NW 1•`Street 16u'Floor Miami, Fl 33128 1 Phone: (305)375-2116 Email: MoubaB@miamidade.00v I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. • (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE • Ib. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE o (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE Id (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. If (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(62004)PAGE MANDATORY USE DATE OF FORM 6/2004 I J Bonfill&Associates RFO#12-04-02 Page 27 I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 03 Complete one Section F Mr each project.) - 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2010 Parking Garage 5- University Park Campus PROFESSIONAL SERV CES CONSTRUCTION(If applicable) Florida International University- Miami, Florida Land Surveying N/A I23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Florida International University Thaddeus Smith 305-216-4021 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope.size,and cost) Description: Complete Land Surveying Services for the Design and Construction of 2,000-space/7-Level Parking Garage Structure. Improvements included site utilities and underground utilities,commercial shell space on ground floor,police department. IScope of Work: Specific Purpose Topographic Survey including: • Location of all above ground improvements within the requested boundaries relative to Florida State Plane Coordinates System Grid • Location of all walls,fences and foundations inclusive of,adjacent to and within five feet outside of the defined boundary I • Permanent Buildings, Temporary Buildings • Temporary bench marks(TBM)referenced to Florida State Plane Coordinates System Grid • Official data upon which the elevations are based. Bench mark established on/or adjacent to site • Elevations, Cross Sections at 50'intervals I • Location of all curbs, building lines, street alleys,sidewalks,curb grades, adjacent grade,description of materials. • Location of Walkways, Parking,Curbs,Asphalt Areas. • Location of all known/visible utility services, poles,wires,hydrants,catch basins&manholes. • Right of Ways. I • Tree Location and Identification. • Surveying Services throughout the construction for General/Specialty Contractors. Total fees paid to firm: $15,000 . I Project Start Date: 06/2008 Completion Date: 08/2010 Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A Owner Information: Florida International University Facilities Management/Facilities Development Department I CAMPUS SUPPORT COMPLEX CSC#245 University Park Campus Miami, Fl 33199 Paulo Costa, Construction Projects Coordinator Phone: (305)348-4009 Email: Paulo.Costa ac fiu.edu Client Information: Turner Construction Company FIU Parking Garage 5 I 885 SW 109`"Avenue Miami FL 33199 • Thaddeus Smith,LEED AP,Senior Project Manager • • Phone: 305-552-9417 Fax: 305-207-7584 Cel: 305-216-4021 E-mail: tsmith@tcco.com I25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(Cary and State) (3)ROLE I a. b (1)FIRM NAME - (2)FIRM LOCATION(City and State) (3)ROLE c. (1)FIRM NAME (2)FIRM LOCATION(Ctty and State) (3)ROLE (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. Ie. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(62004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I . J Bonfill 8 Associates RFQ#12-04-02 Page28 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 04 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2008 I FIU Golden Panther Stadium University Park PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Florida International University,Miami, Florida Land Surveying N/A 1 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Florida International University Paulo Costa 305-348-4009 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) IDescription: Specific Topographic Survey of the FIU Golden Panther Stadium. The approximate area is 8.15 Acres. I Scope of Work: Specific Purpose Topographic Survey including but not limited to: Location of all above ground improvements within the requested boundaries relative to Florida State Plane Coordinates System Grid. Location of all walls,fences and foundations inclusive of,adjacent to and within five feet outside of the defined boundary.Permanent Buildings,Temporary Buildings,Adjacent Lake Area I Provide temporary bench marks(TBM)referenced to Florida State Plane Coordinates System Grid. Official data upon which the elevations are based and the bench mark established on or adjacent to the site. Elevations,Cross Sections at 50'intervals Location of all curbs,building lines,street alleys, sidewalks,curb grades,adjacent grade,description of materials. Location of Walkways, Parking,Curbs,Asphalt Areas, Football field, Goals, Scoreboards&Signs, Running track, Bleachers. I Location of all known and visible utility services, poles,wires, hydrants,catch basins and manholes. Right of Ways,Tree Location and Identification. Surveying Services throughout Construction I Total fees paid to firm: 524,800 Project Start Date: 10/2005(Design) Completion Date: 05/2008(Construction) Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A I Client Information: Florida International University Facilities Management/Facilities Development Department Paulo Costa,Construction Projects Coordinator CAMPUS SUPPORT COMPLEX CSC#245 University Park Campus Miami, Fl 33199 I. Phone: (305)348-4009 Email: Paulo.Costa(ohfiu.edu 1 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. 111 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE Ie. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I1 I AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004STANDARD FORM 330(6 2004)PAGE I I J Bonfill&Associates RFC)412-04-02 Page 29 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAMS 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects,if not specified. 05 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2011 Coconut Grove Business District Street Improvement Project PROFESSIONAL SERVICES CONSTRUCTION(Il applicable) City of Miami, Florida Land Surveying N/A I23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER City of Miami/TY Lin International Francisco Alonso, PE 305-567-1888 x267 I 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Location: Grand Avenue between Mary Street and Mc Donald Street I Mc Farland between Grand Avenue and South Bay Shore Drive Main Highway between Franklin Avenue and Grand Avenue Description: Topographic Right of Way(RM)Survey and underground utility location for replacement of brick paver sidewalks and tree plantings. Approximately 4,740 LF of RNV Survey. Scope of Work: Topographic RMSurvey including: Design Level Survey( DTM file)with elevations at 25'intervals along edge of pavement,crown of road,curb,sidewalk. • Location of all above ground visible utilities. • Location of all driveways, poles, mail boxes. • Right of Way Striping and traffic sigs. I . Loop detectors • Established Control Points • • Provided Survey Base Line • Tree location within the RM. I . • Survey included 25'beyond side street intersections Fees paid to firm: $21,534 Project Start Date: 07/2011 Completion Date: 10/2011 I Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A Client Information: T.Y. Lin International/HJ Ross 201 Alhambra Circle Coral Gables,FL 33134 1 Francisco Alonso,PE Phone: 305-567-1888 x267 Fax: 305-567-1771 Email: frandsco.alonso(@tylin.com 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. I . (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I c. . (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE 1 d.. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 3311(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill 8 Associates RFD#12-04-02 Page 30 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAMS 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. 06 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2010 I Miami-Dade College Kendall Campus PROFESSIONAL SERVICES CONSTRUCTION(1/app carie) Classroom/Student Services Building Land Surveying N/A 23. PROJECT OWNER'S INFORMATION Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade College Andres Leon 305-237-0581 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope.size,and cost) 1 Description: Proposed Classroom/Student Services Building. Survey used to locate new building and underground infrastructure on the site. . Scope of Work: Specific Purpose Survey approximately 9 acres including 1,400 lineal feet of right of way. Complete As-Built and Topographic Survey I Above ground utilities, invert elevations Tree location All above ground improvements. • Elevations on a 50-foot grid Finish Floor elevation of Building#9 IFees paid to firm: 55,805 Project Start Date: 09-22-2010 Completion Date: 10-18-2010 Client Information: Miami-Dade College Facilities Design and Construction: 11011 SW 104th Street Miami, FL 33176 Project Manager: Andres Leon Telephone: 305-237-0581 Fax: 305-237-0590 Email: aleon3@mdc.edu I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT i (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I b. - (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I c. - (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I J BOnfill&Associates RFC)#12-04-02 Page 31 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. 07 Complete one Section F for each project.) . 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2011 1 Miami-Dade College North Campus PROFESSIONAL SERVICES CONSTRUCTION(ll applicable) Aquatic Center and Homeland Preparedness Center Land Surveying N/A • 23. PROJECT OWNER'S INFORMATION 1 a PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade College Raul L. Rodriguez,AIA 305-448-7417 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Description: Demolition,renovation and refurbishing of existing aquatic building and construction of an 11,000sf addition to the building. The expansion included the Miami College pool for swimming and diving and refurbishing the dive pool/dive deck which is designed to provide for emergency and public safety training with the ability to place vehicles and equipment in and out of the pool. Renovations to the I aquatic center building include restrooms,lockers,classrooms, aerobic center. Parking,walkways, lighting&landscaping. Scope of Work: Land Surveying Services for the Design Facility including: Location of all visible improvements. Location of all above ground visible utilities. Topographic Survey with cross section elevations @ 50'stations. I Inverts and rim elevations of all existing sanitary manholes and catch basins. Easements and restrictions on Specific Purpose Survey. Right of Way of Kennedy Boulevard. Location of all underground utilities Surveying Services for the Construction of Facility including: Establish benchmarks for construction use. Layout for site utilities,verification and record of utility locations and invert elevations(water,sewer,drainage,gas, solar,electric). Offsets for four corners @ New Building. I Verify Batter Boards @ New Building. Elevations and Elevation Certificates for Finish Slabs. Locate four corners @ Pool. Verify Batter Boards @ Pool. Fees paid to firm: $10,605 for Design Survey $11,800 for Construction Survey Total Fees: $22,485 IProject Start Date: 03-2007 Completion Date: 01-2011 Client Information: IRodriguez Quiroga Architects:2100 Ponce de Leon Boulevard Coral Gables, FL 33134 Project Manager: Ivan Bibas Telephone: 305-448-7417 Fax: 305-448-2712 Email: ibibas@rodriguezquiroga.com • I Recreational Design and Construction: 3900 North Powerline Road Fort Lauderdale, FL 33309 Project Manager: Lim Blanc Telephone: 954-566-3885 Fax: 954-566-3335 Email: (blanc@recreationdesign.com .1 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. i (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. Id. FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I 1 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I - I J Bonfill 8 Associates RFC/P12-04-02 Page 32 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 08 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED: 2009 1 City of Miami Bayfront Park& Rock Garden PROFESSIONAL SERVICES CONSTRUCTION(Il applicable) 301 N. Biscayne Boulevard Miami, Florida Land Surveying N/A 23. PROJECT OWNER'S INFORMATION 1 a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Bayfront Park Management Trust Timothy Schmand • 305-358-7550 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(include scope,size,and cost) IDescription: Boundary Survey for the 32 Acre Park Site and a Specific Topographic Survey of Bayfront Park's Rock Garden,Water Marking Lines,complete Right of Way of North Biscayne Boulevard and Miamarina Parkway Drive. Approximately 6.27 Acres. I Scope of Work: 2005 Survey: • All Buildings,Permanent and Temporary Structures • Tree identification and location including Trunk Diameter, Height,Diameter Canopy I • Elevations • Complete Right of Way information including location of: centerline of roadway, edge of pavement,curb&gutter,valley gutter, swale area,back of sidewalk,driveways including type, prominent topographic features and/or obstructions within the RM/line • Fences&Walkways I • Utility information including visible features and visible signs of underground utilities including: Catch basins, Inlets, Manholes, valves,culverts,outfall structures 2006: Sketch and Legal Description for' 12"Water-Main Easement • 1 2008: Update Boundary Survey along fence area. Legal Description reflected Water-Main Easement. 2009: Sketch and Legal Description for Water&Sewer Department Easement I Total fees paid to firm: $32,380 Project Start Date: 01/2005 Completion Date: 05/2009 Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A I Client Information: Bayfront Park Management Trust 301 N. Biscayne Boulevard Miami, Fl 33132 Timothy Schmand Phone: (305)358-7550 Fax: (305)358-1211 Email: tschmand(Wcimiami.fl.us I . 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. - (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE C. - (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE •f.I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6 2000)PAGE MANDATORY USE DATE OF FORM 6/2004 I i • J Bonfill 8 Associates RFQ#12-04-02 Page 33 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. 09 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED 2010 Miami-Dade College Wolfson Campus 300 NE 2n0 Avenue Miami, FL 33132 PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Land Surveying N/A 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade College Gloria Isabel Garzon (305)237-0561 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,andcosL Description: For four parcels at Miami-Dade College Wolfson Campus Classrooms/Student Union Building. Limits of Survey Work: The full roadw y rights-of-way of NE 2nd Avenue and NE 3rdStreet abutting the four properties, including the radius of return at NE 4ei Street and NE 2 Avenue,and the full intersection of NE 3f0 Street and NE 2nd Avenue up to the furthest radius of return. Twenty five(25)feet outside the abutting rights-of-way. A portion of existing Mc Donald's Building to the north of the subject parcels. Up to the western Metro Mover columns, including the western edge of the overhead Metro Mover track. Scope of Work: Outside the roadways: Boundary and topographic survey in State Plane coordinates. Located all visible above-ground improvements, including pavement and types of ground cover,driveways,walkways, curbs, mailboxes,fences,trees,signs, buildings, structures,lighting,drainage, utilities,overhead power lines. Located all easements within or abutting the property. Located all legal 1 property boundaries and property corners referenced to property/plat maps. Existing grade elevations based on NGVD along all property corners and boundaries at 50'max intervals, at located improvements and significant grade'breaks. Located the closest Metro Mover columns to the property and the west edge of the overhead Metro Mover structure. • Abutting rights-of-ways: Topographic route survey in State Plane coordinates. Set centerline controls and survey tie to Section Corner Set West to East and South to North baselines. Set elevation control along the route(TBM). Located all visible above-ground improvements, including pavement and types of ground cover,driveways;walkways,curbs, mailboxes,fences,trees,signs, buildings, structures,lighting,drainage, utilities, overhead power lines. Roadway cross-sections at 50'stations and significant grade breaks(high and low points)with elevations at: R/W lines and centerlines,crown of road,edge of pavement,top of curb,front and back of sidewalk. Utilities(on and off site): Topographic survey and underground utility location by Ground Penetration Radar(GPR)for underground utility location of conductive and non-conductive materials;flagging of water lines,sewer lines, electric lines and communication lines. Located all visible above ground utilities, including drainage catch basins,valve boxes, hydrants,manholes, structures, poles,overhead lines. Indicated type of utilities(sanitary, storm,water,gas, telephone,etc.)and corresponding companies. Designated the horizontal locations of all existing drainage and underground utility lines,ductbanks, etc., including type,alignment,size, material and whether active or inactive. Utilized Ground Penetrating Radar(GPR)and Radio Electro-Magnetic Frequency(RF). Elevations for all underground structures(inlets and manholes)including rim elevations,invert elevations and directions,size and material of connecting pipes,bottom of structure elevations. Located existing utilities on-site and off-site. Fees paid to firm: 514,052 Project Start Date: 10/2009 Completion Date: 05/2010 e Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated: N/A Actual: N/A Client Information: Miami-Dade College Wolfson Campus 300 NE 2nd Avenue Miami, Fl 33132 Gloria Isabel Garzon Telephone: (305)237-0561 Fax: (305)237-2590 Email: garzon@rndc.edu 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. (1)FIRM NAME . (2)FIRM LOCATION(City and State) (3)ROLE c. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE d. • (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE I f, AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 1 • I J Bonfill&Associates RFC)#12-04-02 Page34 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20.EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency,or 10 projects, if not specified. 10 Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED: 2011 1 City of Hialeah Roadway and Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION(I/applicable) Hialeah,Florida Land Surveying N/A 23. PROJECT OWNER'S INFORMATION Ia.PROJECT OWNER b.POINT OF CONTACT NAME c.POINT OF CONTACT TELEPHONE NUMBER City of Hialeah Ignado Serralta P.E.-SRS Engineering 305-662-8887 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include supe,size,and cost) I Description: Topographic Right of Way Survey for the City of Hialeah Roadway Improvements/WASD. Route Surveys: 14°i Court between 780 Terrace and 69°'Street 14°1 Avenue between 83"'Street and 78°'Terrace I81°'Street between 16°i Avenue and 10 Avenue 78°i Terrace between 140'Avenue and 15°i Avenue 800,Street between 18°'Avenue and 16°'Avenue 84°i Street between 40f Avenue and 6°i Avenue 760i Street between 14°'Curt and 19°'Court I Pump Stations#137, 138,139,140, 142& 144 Canal Crossing Sketch and Legal Description for Tract 2 I Scope of Work: The following information was documented in our Surveys. Reference Baseline(not for construction),cross-sections at 100'intervals,breaks in the grade. All intersections from the PC of the curve. • Prominent topographic features and/or obstructions within the RNV line • Location of centerline of roadway,edge of pavement,curb&gutter,valley gutter,swale area,back of sidewalk,driveway location • Trees including location,identification,diameter of trunk,spread and height of canopy All above ground utilities,utility poles,overhead service. Visible features/signs of underground utilities:catch basins,inlets,manholes, valves,culverts,outfall structures. Location,type&size of all drainage and sewer structures: rim&invert elevation,pipe type&size • Temporary Benchmarks established in the field,referencing locations for all Survey Control Points I Total fees paid to firm: 586,290 Project Start Date: 08/2010 Completion Date: 09/2011 Total time of construction: Estimated: N/A Actual: N/A Total cost of construction: Estimated:N/A Actual: N/A I Client Information: SRS Engineers/Ignacio Serralta, P.E. 5001 SW 74th Ct #201 Miami, Fl 33155 Phone: (305)662-8887 Fax: (305)662-8858 Email: ignacio@srs-Corp.com 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE a. • I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE b. I (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE c. (1)FIRM NAME (2)FIRM LOCATION(City and State) -(3)ROLE I d. (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE e. 1 (1)FIRM NAME (2)FIRM LOCATION(City and State) (3)ROLE f. I I AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM STANDARD FORM 330(52004)PAGE 6/2004 I • I J Bonfill&Associates RFO#12-04-02 Page35 I G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in'Example Projects Key"section below before completing (From Section E, (From Section E, table. Place"X"under project key number for I Block 12) Block 13) participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Juan J. Bonfill Land Surveyor of Record/ X X X X X X X X X. X I Senior Project Manager Eugenia Formoso Registered Land Surveyor/ X X X X X X X X X X Senior Project Manager Jannet Suarez Registered Land Surveyor/ X X X X X X X X X X Project Manager I I I f I I I I 1 29. EXAMPLE PROJECTS KEY I NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO TITLE OF EXAMPLE PROJECT(FROM SECTION F) 1 Miami Central Senior High School 6 Miami-Dade College Kendall Campus Classroom/Student Services Building I 2 FEC Borrow Ditch Canal Dredging PWD Project Number 20070624 Miami, FL 7 Miami-Dade College North Campus Aquatic Center and Homeland Preparedness Center 3 FIU Parking Garage 5- University Park Campus 8 City of Miami Bayfront Park& Rock Garden I4 FIU Golden Panther Stadium University Park Campus g Miami-Dade College Wolfson Campus 5 Coconut Grove Business District 10 City of Hialeah Roadway Improvements Street Improvement Project_ I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill&Associates RFQ#12-04-02 Page 36 IH.ADDITIONAL INFORMATION 30.PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY.ATTACH ADDITIONAL SHEETS AS NEEDED. J.Bonfill&Associates is experienced in Architecture.Land Planning and Development.Construction Management and Land Surveying and Mapping. We ' are currently involved in projects that require state of the an technology and innovative design for federal.state,municipal agencies and private developers. These projects demand great attention to detail,management.time constraints and budget. Our firm is capable and willing to meet The City of Sunny Isles Beach's time and budget requirements. Our firm,together with our consultants,meets and exceeds the requirements in The City's request for qualifications. Our proposed team and description of services: ' J.Bonfill&Associates—Prime responsible for: Architecture Construction Management . ADA Title II Specialists Sen•ices • I Land Sun-eying&Mapping Services Underground Utility Location Sen•ices Our team of Minority Certified Professional Consultants will consist of: Vital Engineering.Inc.responsible for: ' Mechanical.Electrical.Plumbing Engineering&LEED Nifah& Partners Consulting Engineers responsible for. Structural Engineering. Our firm is familiar with the requirements and scopes of work that are associated with the City of Sunny Isles Beach Request for Qualifications for Continuing Professional Architectural& Engineering Services. • 26 Years of experience in architectural design • Experienced at federally funded projects ' • Registration with the State of Florida since 1991 • Meets the RFQ's insurance requirements • Experienced with ADA commercial compliance-ADA Title II Specialist with Miami-Dade County • Experienced with wind velocity design requirements • Experience with commercial and residential structures-sample project list provided • Available to commence with the work immediately. We are familiar with the unique requirements that are associated with municipal projects: Our staff has been responsible for producing preliminary cost I budgets and scope of work and are able to breakdown all aspects of a project to determine their adequacy. Recent similar projects requiring this specialized attention are included in our relevant experience. As Architects our role is to respond not only to the project users needs but also to address the needs of the community surrounding our project. As president of J. Bonfill and Associates, I will lead our firm and serve as principal in charge. 1 have twenty- six years of experience in architecture. Iconstruction administration, land planning. land surveying and developing. As architect of record for many new, remodeling and renovation projects that are large and complex. I have selected the team of engineering consultants. coordinated all aspects of the work, from initial planning. construction documents,permitting.construction sequencing and construction administration. Established: 32 years-Corporation established in the State of Florida 05/1980 IFirm Status: State of Florida Corporation Certificate Number L02047 FEIN:650133546 Owners: Jacqueline Bonfill Gee/Pres/75%owner IJuan J.Bonfill/VP/25%owner Licenses: Architecture Business AAC002050 Land Sun-eying&Mapping Business LB3398 IStaff Resources: I Registered Architect 4 Graduate Architects 8 AutoCAD Technicians 3 Registered Surveyors 2 Graduate Engineers 4 Survey Crews I FDOT Qualifications: Group 14: Architect Group 8:Surveying: 8.1 Control Surveying I82 Design.R/W&Construction Surveying 8.4 R/W Mapping Miami-Dade County Technical Certifications: 14.00 Architecture 15.01 Surveying&Mapping Land Sun•eying I 18.00 Architectural Construction Management 15.02 Surveying&Mapping Aerial Photog ammetn• 22.00 ADA Title 11 Consul tant15.03 Underground Utility Location Miami-Dade County Minority Certifications: Disadvantaged Business Enterprise DBE#3992 Small Business Enterprise SBE#10637 Community Business Enterprise CBE#1259 Equitable Distribution Program EDP Participant I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I J Bonfill&Associates RFQ#12-04-02 Page 37 IH.ADDITIONAL INFORMATION 30.PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY.ATTACH ADDITIONAL SHEETS AS NEEDED.CONTINUED PROPOSED ARCHITECTURAL SERVICES: I Planning and Programming Construction Services Site Analysis Construction Sequencing • Facility Programming and Planning Construction Documents Zoning Analysis and Applications Construction Administration I Public Hearing/Variance PresentationsContract Bidding and Negotiations Pre-Design Services Inspections Project Programming As-Built and Close-out Documents Design Criteria Studies Additional Services I Existing Conditions Surveys Quality Assurance Architectural Design Specifications Site Planning and Design Cost Estimating Architectural Analysis/Reports Construction Documents I Architectural Concept Program Management & Renderings ADA/Accessibility Assessment Design Schematic Design Permitting Design Development Life Safety Code Evaluations I Final Design Change of use applications Cost Control Evaluation Certifications Interior Planning and Design Computer Services Programming and Space Planning Computer-aided Design Furnishings,Fixtures and Equipment Computer-aided Drafting IInterior Renovation Engineering Design/Plotting PROPOSED LAND SURVEYING,MAPPING AND UNDERGROUND UTILITY LOCATION SERVICES: 1. Bonfill & Associates is a woman owned firm. It was incorporated in the State of Florida in 1980 to provide Land Surveying Services. The founder and current Surveyor of Record,Juan 1.Bonfill, has been providing Land Surveying Services in the State of Florida for 31 years and has over 44 years experience as a Land Surveyor. Our firm is familiar with the requirements and scopes of work that are associated with the City of Sunny Isles Beach. • Design Surveys • Recordation of Easements&Right of Ways • Right of Way Surveys • Boundary Surveys • Sketches and Legal Descriptions • Tree Surveys I • AutoCAD drafting • • Calculations • Hydrographic Surveys • Construction Surveys • Aerial Photogrammetry • Topographical Surveys • • Mapping • ALTA/ACSM Surveys • Review of Public Records We are experienced in conducting multiple concurrent projects and providing services to multiple government agencies and private sector clients. I We are under continuing services contracts with: City of Miami. City of Miami Beach, Miami Dade County Public Schools. Florida International. University and the following Miami-Dade County Departments since 1995: • Aviation • Environmental Resources Management • Solid Waste • Fire Rescue • General Services Administration • Water and Sewer • Housing Agency • Parks and Recreation • Public Works J.Bonfill performs Land Surveying Work on a regular basis with: • Miami-Dade College • University of Miami • Florida Power and Light I • Private Schools • City of South Miami • City of Hialeah Our ongoing projects include site specific surveys for government owned facilities. right of way surveying, surveying of canals, engineering surveys for the design of drainage improvements. surveying of Fire Rescue facilities, surveying of Florida International University. Miami-Dade County Public Schools facilities. IWe carefully selected the consultant in our team. Vital Engineering is presently designing a 9-story office and parking garage building designed to earn LEED certification for new construction. Ni fah& Partners is involved in high-rise buildings including parking garages,courthouse renovations and addition project.structural investigations and reports.inspections,repair of construction failures and cost estimation. Our consultants represent experienced professionals with the necessary experience and resources to provide the highest level of engineering services. Our proposed team is capable of providing I the City of Sunny Isles Beach with complete professional services for projects of all scope and sizes. We believe that with our diversified background. design and construction related experience:J.Bonfill&Associates and its consultants is uniquely qualified to offer professional services. I. AUTHORIZED REPRESENTATIVE IThe foregoing is a statement of facts. 31.SIGNATURE r 32. (w�ter_� 277E DATE 04-27-2012 I33. E AND TITLE Jacqueline Bonfill Gee, Registered Architect, President IAUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I I ' J Bonfill 8 Associates REQ#12-04-02 Page 38 1.SOLICITATION NUMBER Of am) I ARCHITECT ENGINEER QUALIFICATIONS RFQ#12-04-02 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) I 2a.ARM(OR BRANCH OFFICE)NAME 3.YEAR ESTABLISHED 4.DUNS NUMBER J.BONFILL&ASSOCIATES, INC. 1987 605198811 2b.STREET 5.OWNERSHIP I 7100 S.W.99'"AVENUE SUITE#104 a.TYPE 2c.CITY 2d.STATE 2e.ZIP CODE Corporation MIAMI . FL 33173 b.SMALL BUSINESS STATUS * 6a.POINT OF CONTACT NAME AND TITLE Miami-Dade County Certified ® JACQUELINE BONFILL GEE, PRESIDENT 7.NAME OF FIRM(!fblock 2a it a branchoffice) 6b.TELEPHONE NUMBER 6c.E-MAIL ADDRESS N/A • I 305-598-8383 jackie@jbonfill.com 8a.FORMER FIRM NAME(S)(Irani) 8b.YR.ESTABLISHED 8c.DUNS NUMBER JUAN J.BONFILL 8 ASSOCIATES INC. 1987 I 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS c.No.of Employees c.Revenue a.Function a.Profile Index Code I b.Discipline Code b.Experience Number (1)FIRM (2)BRANCH (see below) 02 ADMINISTRATIVE 2 All Auditoriums&Theaters 1 06 ARCHITECT 1 B01 Barracks and Dormitories 1 I 08 CADD TECHNICIAN 6 C10 Commercial Buildings 1 38 LAND SURVEYOR 3 C71 Community Facilities 1 48 PROJECT MANAGER 2 C15 Construction Management 2 58 TECHNICIAN/ANALYST 6 D07 Dining Halls, Clubs,&Restaurants 2 I D08 Dredging Studies& Design 2 C16 Construction Surveying 3 E02 Educational Facilities 3 I ElO G01 Environmental&Nat Res. Mapping 1 Garages Vehicle Maint&Parking 1 H07 Highways Streets& Paving 2 H10 Hotels&Motels 1 I H11 Housing 3 101 Industrial Building 1 • L02 Land Surveying 3 1001 Office Buildings& Industrial Parks 2 P13 Public Safety Facilities 1 R04 Recreational Facilities 1 S10 Surveying,Mapping,Flood Plain 2 Other Employees T04 Topographic Surveying&Mapping 2 Total 19 WOt Warehouses&Depots 1 11.ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1 Less than$100,000. 6. $2 million to less than$5 million FOR LAST 3 YEARS 2. $100,00 to less than$250,000 7. $5 million to less than$10 million (Insert revenue index number shown at tight) 3. $250,000 to less than$500,000 8. $10 million to less than 525 million a.Federal Work - 4. $500,000 to less than$1 million - 9. $25 million to less than S50 million b.Non-Federal Work 5- 5. $1 million to less than$2 million 10. $50 million or greater I c.Total Work 5 12.AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. Ia.SI NATURE ( Q ^, U b.DATE .EAN�LE w"`� Com^- ��V\ 104-27-2012 E AN TLE I JA UELINE BONFILL GEE,PRESIDENT AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330(6/2004)PAGE MANDATORY USE DATE OF FORM 6/2004 I ' J Banfill 8 Associates RFO 512-04-02 Page 39 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Nelson Vital,P.E. 13. ROLE IN THIS CONTRACT: Electrical Engineer 14a. YEARS EXPERIENCE-TOTAL 47 14b. YEARS EXPERIENCE-WITH CURRENT FIRM: 19 15. FIRM NAME AND LOCATION(City and State): Vital Engineering,Inc.—7100 S.W.99m Avenue,5202—Miami,Fl 33173 16. EDUCATION(DEGREE AND SPECIALIZATION): Bachelor of Science in Electrical Engineering 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE):Florida—Electrical—P.E.No. 15880 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.):IEEE,IESNA,AEE,NFPA,LEED AP 19a(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State): Aventura Office Building and Parking Garage- Aventura,Florida 19a(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES:2002 19a(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(H applicable):2004 19a(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope,size,cost etc.)AND SPECIFIC ROLE: New 13-story Office Building and 5-story Parking Garage. Electrical Engineering and Design. 19a(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm: X 19b(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State): Miami Green Office Building and Padding Garage-Miami,Florida 19b(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES: 2006 19b(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION pl applicable):2009 19b(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brie(scope,size,cost eta)AND SPECIFIC ROLE: New 13-story Office Building and 13-story Parking Garage. Electrical Engineering and Design. ' .19b(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm: X 19c(1) RELEVANT PROJECT-TITLE AND LOCATION(City end State): Merrick View Office Building end Parking Garage- Miami,Florida 19c(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES:2007 19c(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(If applicable):2010 19c(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope,size,cost etc.)AND SPECIFIC ROLE: New 8-story Office Building and 4-story Parking Garage. Electrical Engineering and Design. 19c(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm: X 19d(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State): Deerwood Park Recreation Building-Miami-Dade County,Florida 19d(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES: 2008 19d(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(If applicable): 2010 19d(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope.size,cost etc.)AND SPECIFIC ROLE: New Recreation Building.including offices,storage,multi-purpose rooms,concession area and toilet facilities. Electrical Engineering and Design. 19d(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm: X • 19e(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State):Jose Marti Park Multi-Purpose Building- Miami,Florida 19e(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES: 2001 1 19e(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(If applicable): 2004 19e(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brie(scope,size,cost etc.)AND SPECIFIC ROLE: New Multi-Purpose Building, including offices,storage,multi-purpose rooms,classrooms,computer room and toilet facilities. Electrical Engineering and Design. 19e(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm: X STANDARD FORM 330 (6/2004) PAGE 3 J Bonfill&Associates RFQ#12-04-02 Page 40 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT . (Complete one Section E for each key person.) I12. NAME: Rafael Pena,P.E. 13. ROLE IN THIS CONTRACT: Mechanical Engineer 14a. YEARS EXPERIENCE-TOTAL: 41 14b. YEARS EXPERIENCE-WITH CURRENT FIRM: 11 1 15. FIRM NAME AND LOCATION(City and State): Vaal Engineering,Inc.—7100 S.W.99m Avenue,#202—Miami,Fl 33173 16. EDUCATION(DEGREE AND SPECIALIZATION): Bachelor of Science in Mechanical Engineering 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE):Florida—Mechanical—P.E.No. 16395 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training,Awards,etc.):ASME,ASHRAE 19a(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State):Aventura Office Building and Parking Garage—Aventum,Florida 19a(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES: 2002 19a(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(If applicable):2004 19a(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope,size,cost etc.J AND SPECIFIC ROLE: New 13-story Office Building and 5-story Parking Garage. Mechanical Engineering and Design. 19a(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm:X 19b(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State): Miami Green Office Buikfing and Parking Garage- Miami,Florida 19b(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES:2006 19b(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(If applicable):2009 19b(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope,size,cost etc)AND SPECIFIC ROLE: New 13-story Office Building and 13-story Parking Garage. Mechanical Engineering and Design. 19b(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm:X 19c(1) RELEVANT PROJECT-T1TLE.AND LOCATION(City and State): Menick View Office Building and Parking Garage-Coral Gables,Florida 19c(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES: 2007 19c(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION Of applicable): 2010 19c(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope,size,cost etc.)AND SPECIFIC ROLE: New 8-story Office Building and 4-story Parking Garage. Mechanical Engineering and Design. 19c(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm: X 19d(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State): Deerwood Park Recreation Building-Miami-Dade County,Florida Ii9d(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES: 2008 19d(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(If applicable):2010 19d(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope,size,cost etc.)AND SPECIFIC ROLE: New Recreation Building,including offices,storage,multi-purpose rooms,concession area and toilet facilities. Mechanical Engineering and Design. 19d(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm:X 19e(1) RELEVANT PROJECT-TITLE AND LOCATION(City and State):Jose Marti Park Multi-Purpose Building-Miami,Florida 19e(2) RELEVANT PROJECT-YEAR COMPLETED-PROFESSIONAL SERVICES:2001 19e(2) RELEVANT PROJECT-YEAR COMPLETED-CONSTRUCTION(If applicable):2004 19e(3) RELEVANT PROJECT-BRIEF DESCRIPTION(Brief scope,size,cost etc.)AND SPECIFIC ROLE: New Multi-Purpose Building, Including offices,storage,multi-purpose rooms,classrooms,computer room and toilet facilities. Mechanical Engineering and Design. 19e(3) RELEVANT PROJECT-BRIEF DESCRIPTION-Check here if project performed with current firm: X STANDARD FORM 330 (6/2004) PAGE 3 i • t J Bonfill&Associates RFQ#12-04-02 Page 41 H.ADDITIONAL INFORMATION 29. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED: Vital Engineering,Inc.has a staff member who is LEED Axredited Professional by the Green Building Certification Institute of the U.S. Green Building Council. Also,Vital Engineering,Inc.was part of the design team for a thirteen(13)—story office and parking garage building which earned LEED Certification for New Construction.' In addition.Vital Engineering,Inc.is presently part of a design team for a nine(9)—story office and parking garage building which is being Designed to earn LEED Certification for New Construction. 1 1 • • 1 1 I 1 1 1 1 1 9. AUTHORIZED REPRESENTATIVE T foregoin• "sntementoffacts. 30. SIGNATURE OF AUTHORIZED REPRESENTATIVE: 1 31. DATE SIGNED: April26,2012 32. NAME AND TITLE OF SIGNER: Nelson Vital,P.E.-President STANDARD FORM 330 (6/2004) PAGE 7 1 _ J Bonfill&Associates RFO d12-04-02 Page 42 ARCHITECT-ENGINEER QUALIFICATIONS PART II -GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 1. SOLICITATION NUMBER(If any): 2a. FIRM(OR BRANCH OFFICE)NAME: Vital Engineering,Inc. 2b. FIRM(OR BRANCH OFFICE)STREET: 2c. FIRM(OR BRANCH OFFICE)CITY: 7100 S.W.99°Avenue,*202-Miami,Florida 33173 2d. FIRM(OR BRANCH OFFICE)STATE: Florida • 2e. FIRM(OR BRANCH OFFICE)ZIP CODE: 33173 3e YEAR ESTABLISHED: 19 93 1 3e. DUNS NUMBER: 034812888 5a. OWNERSHIP-TYPE: Corporation 5b. OWNERSHIP-SMALL BUSINESS STATUS: Small Disadvantage Business 6a. POINT OF CONTACT NAME AND TITLE: Nelson Vital,P.E.-President 6b. POINT OF CONTACT TELEPHONE NUMBER 305-412-6000 6c. POINT OF CONTACT E-MAIL ADDRESS: vitaleng@aol.com 7. NAME OF FIRM(If block 2a is a branch office): 8a.FORMER FIRM NAME(S)(If any) 18b.YR. ESTABLISHED 8c. DUNS NUMBER i 0 1 I . i i 1 1 STANDARD FORM 330 (6/2004) PAGE e 1 1 J Bonfill 8 Associates RFC/#12-04-02 Page 43 9. EMPLOYEES BY DISCIPLINE 1 a. Function Code b. Discipline c(1). No.of Employees c(2). No.of -Firm Employees-Branch 02 Administrative • 1 08 CADDTechnIclan 4 1 21 Electrical Engineer 2 42 Mechanical Engineer 2 1 1 I j 1 I I 1 Other Employee 1 10 1 1 1 1 1 1 1 1 1 1 1 STANDARD FORM 330 (82004) PAGE 9 1 I J Bonfill 8 Associates RFQ#12-04-02 Page 44 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS I a.Profile Code b. Experiencec.Revenue Index A06 Airport;Terminal Hangars 2 All Auditorium and Theatres 1 C10 Commercial Buildings 1I C13 Computer Facilities 1 D07 Dining Halls,Restaurants 2 F02 Educational Facilities 2 F02 Gymns,Stadiums 1 GO1 Garages,Vehicle Maint.Facilities . 1 H06 High Rise Type Buildings 2 H09 Hospital and Medical Facilities 1 H11 Housing 2 101 Industrial Buildings 1 I J01 I Judicial Courtroom Fac. I 1 L01 Laboratories 1 LO4 Libraries 1 I L06 Lighting 1 001 Office Buildings 12 P11 Postal Facilities I 1 R04 Recreation Facilities I 1 - I SO4 Sewage Collation;Treatment 12 I W01 Warehouses and Depot ,, 1 W03 Water Supply;Treatment I 1 " I PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than$100,000 6. $2 million to less than$5 million 2. $100,000 to less than$250,000 7. $5 million to less than$10 million 3. $250,000 to less than$500,00 8. $10 million to less than$25 million 14. $500,000 to less than$1 million '5. $1 million to less than$2 million 9 $25 million to less than$50 million 10. $50 million or greater 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS I (Insert revenue index number shown above) , 11a. Federal Work: I 11 b. Non-Federal Work: 4 11c. Total Work: 4 P . 12a. SIGNATURE: 2. AUTHORIZED% PRESENTATIVE. The foregoing is a statement of facts. / 12b. DATE SIGNED: April 26,2012 I •I I OSTANDARD FORM 330 (6/2004) PAGE 10 I 1 • J Bonfill&Associates REO#12-04-02 Page45 H. ADDITIONAL INFORMATION 30.PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. Nifah and Partners Consulting Engineers, Inc. (N&P) is a Civil and Structural Engineering Design and Construction Services firm in Miami-Dade County. Founded in August 1995, N&P maintains a dedicated staff consisting of Professional Engineers, Inspectors, Construction 11 Managers, CARD Technicians and Ccst Esmitators. Services Offered Include: • t General Civil Engineering General Structural Engineering " High Rise /Low Rise Building Design (Structural and Civil Engineering) • Structural Investigations and Reports • " Highways/Bridge Design & Inspections Threshold Inspections • Repair of Construction Failures • Construction and Contract Administration * Construction Cost Estimating All of the firm's activities in the areas of design, drafting, estimating and specification development are fully automated. N&P utilizes the most current versions of AutoCAD, as well as Structural and Civil Engineering software. As a company, we are committed to serving our clients on a one-to-one and project specific basis. Our staff is devoted to providing the highest level of Professional Service to our clients. Nifah and Partners Consulting Engineers, Inc. , is an affirmative action employer with a Dade County approved Affirmative Action Plan and is a Dade County Certified DBE and CBE firm. N&P is also MBE Certified with the City of Miami, Miami-Dade Public Schools, The School Board of Broward County, North Broward Hospital District and the Office of Supplier Diversity. Nifah and Partners Consulting Engineers, Inc. is 8a Certified with the Federal Government. i 1 1 i I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31.SIGNATURE_ 32.DATE 33.NAME ANDSTITLE�`� 04/26/2011 Samuel N. Nifah, President • STANDARD FORM 330 16/20041 PAGE 5 •1 1 J Bonfill 8 Associates RR)#12-04-02 Page 46 ARCHITECT-ENGINEER QUALIFICATIONS 1.SOLICITATION NUMBER pt any! PART II - GENERAL QUALIFICATIONS 1llf a firm has branch offices, complete for each specific branch office seeking work.) 2a.FIRM IOR BRANCH OFFICEI NAME 3.YEAR ESTABLISHED 4.DUNS NUMBER NIFAH AND PARTNERS CONSULTING ENGINEERS, INC. 1995 173621171 2b.STREET 5. OWNERSHIP I 8785 SW 165 AVENUE, SUITE 108 a.TYPE 2c.CITY 2d.STATE 2e.ZIP CODE Struct. Eno. Consultino Svc MIAMI FL 33193 b.SMALL BUSINESS STATUS I 6a.POINT OF CONTACT NAME AND TITLE Yes SAMUEL N NIFAH, P.E. 7.NAME OF FIRM(If block 2a is a branch office) 6b.TELEPHONE NUMBER 6c.E-MAIL ADDRESS I (305) 386-1002 8a. FORMER FIRM NAME151 Ill eny/snifah6nifahpartrers.Com 8b. YR. ESTABLISHED 8c.DUNS NUMBER I9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function C.No.of Employees a.Profile c.Revenue Index Code b. Discipline b. Experience Number It)FIRM 121 BRANCH Code (see be%ow) 8 ICADD Technicion 2 0 302 Bridges 2 12 Civil Engineer 2 U CIO Commerci Bldg/Shopping Ctr 1 1 i7 Structural Engineer 'I U H11 Housing-Res,MultiFam,Apt, 1 001 Office buildings;Znd.Parks 1 SO9 Struc.Design;Special Struc 2 T02 Testing & Inspection Svc. 2 1 Vol ValAnaiysis;LifeCycle Cost 1 • I III I , Other Employees 1Total 11 U 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM • FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million I (Insert revenue index number shown at right) 2. 9100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 1 3. $250,000 to less than 9500,000 8. $10 million to less than 925 million ' b. Non-Federal Work 4 4. $500,000 to less than 91 million 9. $25 million to less than $50 million c. Total Work 5 5. 91 million to less than $2 million 10. 950 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a.SIGNATURE kr% b.DATE ita c.NAME AND TITLE J 04/2F/2012 SAMUEL N. NIFAH, PRESIDENT ' AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330160004/ PAGE 6 I I I J Bonfill&Associates 40#12-04-02 Page 47 I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) • 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE ®® Principal in Charge for Nitah a.TOTAL b.WITH CURRENT FIRM I Samuel N. Niiail. P E. & Partners Consulting Eng 24. 16 15.FIRM NAME AND LOCATION(City and State) Nifah and Partners Consulting Engineers, Inc. Miami, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) I MS-Structural Engineering Professional Engineer State of Florida (Civil and Structural) , General Contractor (Florida) and Special Threshold Inspector (Florida) I 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications,Organizations, Training,Awards,etc.) I 19. RELEVANT PROJECTS ' 11)TITLE AND LOCATION(City and Stare) 12)YEAR COMPLETED II Misc. Structural Engineering Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(if applicable) Services @ Miami Intl Airport 2004 13)BRIEF DESCRIPTION(Bdef scope,she,cost,enc.!AND SPECIFIC POLE U Check if project performed with current firm a. I Provided miscellaneous Structural Engineering Services for Miami Dade Aviation Department on numerous projects at Miami International Airport. I (1)TITLE AND LOCATION(City and State) 21 YEAR COMPLETED Overtown Transit Village Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(if appbYab/el I 2006 2009' 13) BRIEF DESCRIPTION(Briel scope,size,cost,etc.)AND SPECIFIC ROLELCheck if project performed with current firm b, Structural Engineers of Record for this 22 story office Building at Downtown Miami I 1 TITLE AND LOCATION(City end Stare) 21 YEAR COMPLETED Joseph Caleb Center Courthouse Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(Il applicable) Renovations & Extension ��� 2011 13) BRIEF DESCRIPTION Wel scope,size,cost,etc.)AND SPECIFIC ROLE I_I Check if project performed with current firm C. Structural Engineer of Record for the Pedestrian Overpass Bridge & Atrium Expansion as well as Civil Engineer of Record for the entire Courthouse renovations and additions. II (11 TITLE AND LOCATION(City and Stare) - 12)YEAR COMPUTED New Northside Runway 8-26 at Miami Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(I/applicable) International Airport 2000 2003 1d. (3) BRIEF DESCRIPTION Wel scope,she,cost,etc.)AND SPECIFIC ROLE I-1 Check if project performed with current firm Structural and Civil Engineering design services for the new runway at Miami Internation_ai Airport. II (1)TITLE AND LOCATION(City end State) • 12)YEAR COMPLETED Hotel de 1,'Opera at 1771 NE 4th Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(/f applicable Aveue 2010 I13) BRIEF DESCRIPTION(Brief e!scope,size,cost,etc.)AND SPECIFIC ROLE 1 Check if project performed with current firm 9. Provided coordination of the structural design and development of the construction. The building is a 39-story residential with P.T. concrete slabs, concrete shear walls and Icolumns on auger-cast pile foundation- STANDARD FORM 330(a 2004) PAGE 2 I I J Bonfill 8 Associates RFQ#12-04-02 Page 48 IE. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Structulal Engineer a.TOTAL O.WITH CURRENT FIRM I David Santamaria 30 2 15.FIRM NAME AND LOCATION(City and State/ Nifah and Partners Consulting Engineers, Inc Miami,FL 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISC/PUNE) 1 MS - Structural Engineer Engineer Intern - E.I . 1 18. OTHER PROFESSIONAL OUAUF1CATIONS(Pub#cat%ons,Organizations, Tractmg,Awards,etc.) Computer operator and programmer PhD Candidate, 2011 19. RELEVANT PROJECTS 111 TITLE AND LOCATION(City and Stare) (21 YEAR COMPLETED I Hotel de L'Opera at 1771 NE 4th Ave. , Miami, FL PROFESSIONAL SERVICES CONSTRUCTION(II applicable) 2009 13)BRIEF DESCRIPTION(Brie!scope,size,cost,etc.)AND SPECIFIC ROLE Idl Check i(project performed with Current firm a. I Project Engineer responsible for coordination of the structural design and development of the construction documents. The building is a 39-story residential with P.T. concrete slabs, concrete shear walls and columns on auger-cast pile foundation: Estimated project construction cost $100,000,000 (11 TITLE AND LOCATION(City and Slate) (21 YEAR COMPLETED I Camillus House at Downtown Miami, PROFESSIONAL SERVICES CONSTRUCTION(II applicable) FL 2009 (3) BRIEF DESCRIPTION(Bile/scope,size,cost,etc./AND SPECIFIC ROLE U Check if project performed with current firm b. 1 ' Project Engineer responsible for coordination of the structural design and development of the construction documents. The building consists of 6-modules, 5 stories each, with P.T. concrete slabs, masonry shearwalls, concrete columns on pile foundation. Estimated project construction cost: $35,000,000. 1 (11 TITLE AND LOCATION(City and State) YEAR COMPLETED Everglades on the Bay at 3ayside PROFESSIONAL SERVICES CONSTRUCTION(if applicable) area, Downtown Miami. 2007 2009 13) BRIEF DESCRIPTION(Brie(scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm 1 c. Project Engineer responsible for coordination of the structural design and development of the construction documents. The building is a 52-story residential with P.T. concrete slabs, concrete shear walls and columns on auger-cast pile foundation. Estimated project construction cost $220,000,000 111 TITLE AND LOCATION(City and State) (21 YEAR COMPLETED The Opera Tower (Miramar Ph. II) , PROFESSIONAL SERVICES CONSTRUCTION(If applicable) NE 17th St./4th Ave. , Miami, FL 2005 2008 d. (31 BRIEF DESCRIPTION(Brief scope,size,cost, enc.)AND SPECIFIC ROLE U Check if project performed with current firm Project Engineer responsible for coordination of the structural design and development of the construction documents. The building is a 58-story residential with P.T. concrete slabs, concrete shear walls and columns on auger-cast pile foundation. IEstimated project construction cost $150,000,000 111 TITLE AND LOCATION(City and State) (2)YEAR COMPLETED The 500 Brickell at Brickell area, PROFESSIONAL SERVICES CONSTRUCTION(If applicable) Miami, FL 2005 2008 I (31 BRIEF DESCRIPTION(Brie!scope.size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm e. Two 44-story condominium towers designed over pile foundation. The tower structural systems consist of concrete shearwalls and columns, and Post-Tensioned concrete slabs. IEstimated project construction cost $150,000,000 • STANDARD FORM 330 (6/20041 PAGE 2 I 1 II J Bonfill&Associates RFO#12-04-02 Page 49 1E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Structural Engineer a.TOTAL b.WITH CURRENT FIRM II Ronald L. Du-an, P.E. J 36 2 15.FIRM NAME AND LOCATION(City and State) Nifah and Partners Consulting Engineers, Inc Miami,FL 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINEJ II B.S. - Structural and Civil M.S. (Italy) - Structural Professional Engineer State of Florida ?Ejj 36075 - Structural 1 18. OTHER PROFESSIONAL QUALIFICATIONS(Pubecutions,Organizations,Training,Awards,etc.) Continuing Education Provider for Professional Engineers General Contractor (Inactive) I 19. RELEVANT PROJECTS Ill TITLE AND LOCATION(City and State) 12)YEAR COMPLETED 1Paramount Bay at Edge Water at PROFESSIONAL SERVICES CONSTRUCTION(/l applicable) Biscayne bay, Downtown Miami 2006 2009 131 BRIEF DESCRIPTION(Brief scope.size, cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm a. 52-story residential building with 6-story parking garage. Performed complete structural design and structural construction administration. The structure consists of concrete P.T. slabs, conc. shearwalls and columns, and auger-cast pile foundation. Estimated project construction cost: S200,000,000. p)TITLE AND LOCATION IC/ryas/flare) 121 YEAR COMPLETED II Terrazas-at River Park - So. River PROFESSIONAL SERVICES CONSTRUCTION III applicable) Drive & NW 19th Ave. , Miami, FL 2006 2009 131 BRIEF DESCRIPTION(an'el scope,size,cost,etc.)AND SPECIFIC ROLE u Check if project performed with current firm b. 1 Double Tower 27 & 20 stories, residential building with 7-story parking garage. Performed complete structural design and structural construction administration. The structure consists of P.T. concrete slabs, concrete shearwalls and columns, and concrete mat foundation. Estimated project construction cost: $120,000,000. II 11)TITLE AND LOCATION(City and State! (2)YEAR COMPLETED Aventura Marina at Aventura, PROFESSIONAL SERVICES CONSTRUCTION(ll applicable/ Florida 2006 13) BRIEF DESCRIPTION!Brie/scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm I p. Large 19-Story residential concrete building consisting of 3 sections connected by the main shearwalls. Performed structural construction administration, including design of architectural changes, remedial works, review of shop drawings/products, and more. Estimated project construction cost: $70,000,000 I 11)TITLE AND LOCATION(City and State) (2)YEAR COMPLETED Design audit conducted by Broward PROFESSIONAL SERVICES CONSTRUCTION!/f applicable) .County Board of Rules & Appeals 2003 (31 BRIEF DESCRIPTION Wel scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm II d. Review, comments and recommendations to the board on observed structural designs of 11 existing residences for possible ammendments to the Code and/or review policies for the County's plan examinations. Broward County implemented our recommendation for requiring 1residence structural plans to be signed and sealed by a Florida PE. (no const. involved) (1)TITLE AND LOCATION(City and State) 121 YEAR COMPLETED Lynx NOB (New Operating Base) at PROFESSIONAL SERVICES CONSTRUCTION(if applicable) John Young Street in Orlando, FL - 2003 2006 I13) BRIEF DESCRIPTION(Brief scope,size, cost,etc.)AND SPECIFIC ROLE u Check if project performed with current firm e. This is a bus maintenance facility. We performed struct. design of the admin. building consisting of composite steel joists with conc. slabs and precast conc. tilt-up walls. 1 we designed foundations for all maintenance bldos. to support prefab steel structures. Construction consulting services were provided. Estimated construction cost $40,000,000. STANDARD FORM 330 (6/20(4) PAGE 2 I I .J Bonfill 8 Associates RFO#12-04-02 Page50 1E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Structural Engineer a.TOTAL b.WITH CURRENT FIRM I Erlan Pa)enzuela 24 2 15.FIRM NAME AND LOCATION(City and State) Nifah and Partners Consulting Engineers, Inc Miami,FL - 16.EDUCATION (DEGREE AND SPEC/AL24TION) IT.CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) I Structural - B.S. Engineer Intern, E.I. 4 1100007199 (State of Florida) 1 18. OTHER PROFESSIONAL QUALIFICATIONS(htbbcations, Organizations, Training.Awards.etc.) 19. RELEVANT PROJECTS (I)TITLE AND LOCATION(City and State) 121 YEAR COMPLETED Hotel de L'Opera at 1771 NE 4th PROFESSIONAL SERVICES CONSTRUCTION III applicable) Ave. , Miami, FL 2009 N/A (3)BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE N Check if project performed with current firm • a. Analysis and design of 39-story residential building. Design of Concrete and steel Istructures, with emphasis on finite element modeling and auger-cast pile foundations. Developed processed and coordinated of structural computer models, with analysis and dimensioning of shearwall and all other elements. Construction cost $100,000,000. It)TITLE AND LOCATION(City and State) - 121 YEAR COMPLETED I Camillus House at Downtown Miami, PROFESSIONAL SERVICES CONSTRUCTION(II applicable) FL 2009 N/A • (31 BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm b. II 6-Modules 5-story residential buildings. Performed complete structural design. The structure consists of regular and ?.T. concrete slabs, masonry shearwalls and concrete columns, and pile foundation. Estimated project construction. cost: $35,000,000. 1 (I)TITLE AND LOCATION(City and State) I 21 YEAR COMPLETED Everglades on the Bay at Bayside PROFESSIONAL SERVICES'CONSTRUCTION(1/applicable) area, Downtown Miami. 2007 2009 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC POLE U Check if project performed with current firm I c. Double Tower 52-Story residential concrete building. Performed structural design and structural construction administration, including design of architectural changes, remedial works, review of shop drawings/products, and more. Estimated project construction cost: $220,000,000. p)TITLE AND LOCATION(City and State) (2)YEAH COMPLETED The Opera Tower (Miramar Ph. II) , PROFESSIONAL SERVICES CONSTRUCTION 11/applicable) NE 17th St./4th Ave. , Miami, FL 2005 2008 1 (3) BRIEF DESCRIPTION(Brief scope,size,cost,etc.)AND SPECIFIC ROLE U Check if project performed with current firm d. SB-Story residential concrete building and 10-story parking garage. Performed value engineering re-design of all concrete shear walls. Calculation of Lateral Forces on Slab elements. Estimated project construction cost: $150,000,000. 1 Iii TITLE AND LOCATION(City and State) (2)YEAR COMPLETED The ?laza on Brickell at Downtown. PROFESSIONAL SERVICES CONSTRUCTION PI applicable Miami, FL 2006 2008 • 1131 BRIEF DESCRIPTION(Brief scope.size.cost.etc.)AND SPECIFIC ROLE U Check if project performed with current firm 0. 57-Story residential concrete building. Performed structural design, including design of architectural changes, remedial works, and more. I Estimated project construction cost: $220,000,000. STANDARD FORM 330(6/2004) PAGE 2 1 1 • t J Bonfill&Associates RFO#12-04-02 Page 51 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEYQUALIFICATIONS FOR THIS CONTRACT NUMBER (Present es many projects as requested by the agency, or 10 projects, i1 not specified. Complete one Section F for each project.) 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Mikado - Hotel DeL'Opera, Structural Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION(a applicable) Design, Miami, FL 2010 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER Florida East Coast Realty Phil Dahan 305-358-7710 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(hcbtde scope,size,end cost) Structural Engineer of Record. 39-Story multi-use building: Residential, Hotel, Retail and Parking Garage. The structure consists of post-tensioned concrete slabs resting on reinforced concrete beams, columns and shear walls. High strength concrete of up to 12,000 psi was used. The superstructure is supported by high compression capacity piles of up to 1,200 tons with thick concrete pile caps. The shearwalls are designed to resist hurricane wind loads within the "High Velocity Hurricane Zone" ii'. Florida. 11 Nifah & Partners performed a complete structural analysis and review, and designed the foundation system entirely. Project Construction Cost = $100,000,000.00 1 1 1 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (11 FIRM NAME 121 FIRM LOCATION(City and State) (31 ROLE a. Nifah & Partners Miami, Florida Structural Engineer of Record & Consulting Engineers, Inc Project Management/Coordination 111 FIRM NAME 12)FIRM LOCATION(City end State) (31 ROLE b. 0I FIRM NAME 12)FIRM LOCATION(City and State) (31 ROLE c. III FIRM NAME 12)FIRM LOCATION(City end State) 13)ROLE d. 1 (1)FIRM NAME 2)FIRM LOCATION(City and State) 3)ROLE e. (1)FIRM NAME 12)FIRM LOCATION(City and State) (3)ROLE B f. STANDARD FORM 330 16/2004) PAGE 3 1 II J Bonfill&Associates RFO#12-04-02 Page 52 1F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present es many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.! 21.TITLE AND LOCATION(City and State) 22.YEAR COMPLETED Overtown Transit Village, Miami, PROFESSIONAL SERVICES CONSTRUCTION Of applicable) Florida 2009 2009 23. PROJECT OWNER'S INFORMATION I a.PROJECT OWNER E.POINT OF CONTACT NAMEc.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade Cty. Transit Agency Elizabeth Piotrowski (954) 524-8686 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) 1 Structural Engineer of Record for this 22-story High-Rise Office Building at Downtown Miami, including 8 levels of Parking Garage. Project Construction Cost = $60,000,000. II I • 1 II • II25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (11 FIRM NAME (2)FIRM LOCATION(City and State) (31 ROLE I a. Nifah and Partners Miami, Florida Structural Engineer of Record Consulting Engineers, Inc Threshold Inspector (1)FIRM NAME (2)FIRM LOCATION(City and State) 131 ROLE b. I11)FIRM NAME '(2)ARM LOCATION(City end State) • (31 ROLE C. i11)ARM NAME (2)FIRM LOCATION!City end State) (3)ROLE d. 111 FIRM NAME 12)FIRM LOCATION(City and State) (31 ROLE e. • 11)FIRM NAME 12)ARM LOCATION(City and State) 13)ROLE I f. STANDARD FORM 330 16t2004) PAGE 3 I I J Bonfill&Associates RFQ#12-04-02 Page53 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project 21.TITLE AND LOCATION(City end State) 22.YEAR COMPLETED Joseph Caleb Center Courthouse PROFESSIONAL SERVICES CONSTRUCTION(//applicable) Renovations & Extension, Miami, FL 2010 • 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME C.POINT OF CONTACT TELEPHONE NUMBER Miami-Dade Cty. - GSA Raul Carreras, AIA (305) 895-2050 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT(Include scope,size,and cost) Structural and Civil Engineer of Record for this Courthouse renovations and additions. Project Construction Cost = $19,000,000.00 1 I 1 • • 1 1 I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (21 FIRM LOCATION(City and State) (31 ROLE a. Nifah & Partners Miami, Florida Structural and Civil Engineer Consulting Engineers, Inc of Record (1)FIRM NAME (2)FIRM LOCATION(City and State) (31 ROLE b. (1)FIRM NAME (2)FIRM LOCATION(City and State) 131 ROLE C. 1 (1)FIRM NAME 121 FIRM LOCATION(City end State) (31 ROLEd. tI11 FIRM NAME (21 FIRM LOCATION(City and State) (31 ROLE Ill FIRM NAME (21 FIRM LOCATION(City and State) (31 ROLE 1 STANDARD FORM 330 (6/20041 PAGE 3 1 I I J Bonfill&Associates RFC#12-04-02 Page 54 IG. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing I (From Section E, (From Section E, table. Place "X" under project key number for Block 12) Block 13) participation in same or similar role.) 1 2 3 4 5 ' 6 7 8 9 I 10 Samuel N. Nifah, P.E. Principal-in-Charge/ Project Manager K X K X X K XX X I Ronald Duran, P.E. Senior Structural/ Civil Engineer K X X X X X XX X David Santamaria, EI Senior Structural 1Engineer X X X K X X XX X Erlan Palenzuela, EI Senior Struct. Eng. X X X X X X XXX I 1 I I I I I I29. EXAMPLE PROJECTS KEY ' 1 NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT(FROM SECTION F) Overtown Transit Village for Miami-Dade county Transit Agency 6 A-B Infill Shell at Miami International 1 Airport 2 Hotel de 1' Opera/Mikado 7 American Airlines B-C Infill Shell Miami Int'l Airport, Miami, Florida I 3 Off Brickell 8 Joseph Caleb Center Courthouse Project Miami, Florida 4 Prima Luce 9 New Northside Runway at Miami I International Airport 5 South Miami Heights Maintenance 10 Security Operations Control Center at Miami International Airport STANDARD FORM 330 1612004)PAGE 4 I I J Bonfill&Associates RFQ#12-04-02 Page 55 J . BONFILL & ASSOCIATES 4 Architects Land Surveyors & Mappers Summary of Qualifications Owners: Jacqueline Bonfill Gee/ President/ 75% owner Architect of Record - Qualifier for the Firm Florida Licensed since 1991 Juan J. Bonfill/ Vice President/ 25% owner Land Surveyor& Mapper of Record —Qualifier for the Firm Florida Licensed since 1977 Licenses: Licensed Architecture Business AAC002050 Licensed Land Surveying & Mapping Business LB3398 Staffing: 1 Registered Architect 3 Registered Surveyors 4 Graduate Architects 2 Graduate Engineers 8 AutoCAD Technicians 4 Survey Crews • Relevant Experience and qualifications of key personnel are included in this submittal. FDOT Qualifications: Group 14: Architect Group 8: Surveying: 8.1 Control Surveying 8.2 Design, RNV & Construction Surveying 8.4 RNV Mapping Miami-Dade County Technical Certifications: 14.00 Architecture 0 18.00 Architectural Construction Management 22.00 ADA Title II Consultant • 15.01 Surveying & Mapping Land Surveying 15.02 Surveying & Mapping Aerial Photogrammetry 15.03 Underground Utility Location Miami-Dade County Minority Certifications: Disadvantaged Business Enterprise DBE #3992 Small Business Enterprise SBE #10637 Community Business Enterprise CBE #1259 Equitable Distribution Program EDP Participant 7100 Sw 99 ^ Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com 1 J Bonfill&Associates RFQ#12-04-02 Page 56 J B O N F I L L 8 ASSOCIATE S i POI' Architecfs LandSurveyors & Mapeers " ' RESUME OJacqueline Bonfill GePresident / Registered An Architect e I1 • As Principal in Charge, Ms. Bonfill Gee is in charge of the Experience: 26 yrs daily operation of the Firm. She is experienced in land W/J Bonfill: 22 yrs planning and is actively involved in developments from the Project Title: 1 initial design, through the contract document preparation, permitting, and construction administration. Ms. Bonfill Team Project Manager Gee is recognized within the community for her design and Education: I technical abilities in Architecture, Program and Code Analysis, Land Planning, Land Development, Landscaping • Bachelor of Architecture University of Miami, FL Design, Construction Management and Land Surveying. Licenses & Certificates: Ms. Bonfill Gee's diverse knowledge and attention allows • Registered Architect I that each project is unique, well planed, and the final end Florida License-AR0013685 product fulfills the client's program budget and the restraints of time. Professional Affiliations: • National Council of Architectural Professional Responsibilities: Registration Boards NCARB Certificate 44,659 1 As principal in charge her duties include: Guide the client, • NIGP Government Contractor firm and consultant team to succeed and achieve goals; Certification Lead the project team from commencement of project Relevant Experience: Il through construction completion; Guide the project process; Advise on formative decisions; Maintain high-level • Shelter for Victims of Domestic Abuse communication with client decision-makers; Support • Parking Garage Ford 1 Project Managers, Designers, and Project Team; Ensure Automotive Dealership sufficient skilled staff and resources are provided; Facilitate • Miami-Dade Fire Rescue ADA Barrier Removal Project the resolution of all project issues; Prepare performance Phases I, II & Ill. evaluations and compensation adjustments with other • Miami-Dade Fire Rescue Principals in Charge; Read and negotiate client Station #40-west Miami agreements; Prepare and negotiate project fees; Manage, • service & Maintenance identify, define, assign project risks; Ensure a work plan is Facilities for Ford Dealership • Design Criteria Professionals developed to meet the schedule, produce a quality project, for Miami-Dade Fire Rescue I and enable firm's success; Ensure project decisions and Station#58-Tamiami communications are documented clearly; Ensure the • North west Community Center Complex project process reflects the clients' and firm's goals and • Europa Biscayne Restaurant ' objectives. • Coral Springs KIA Showroom • Legacy Development Office Condominiums I '" 7100 SW 99'^ Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com 1` IJ Bonfill&Associates RFQ#12-04-02 Page57 .� ill J . BONFILL & ASSOCIATES 1 Architects Land Surveyors & Mapper s 1RESUME David Gee Senior Project Manager I 1 David Gee has been a Senior Project Manager for the past Experience: 25 yrs twenty years. In his capacity as member of both design W/J Bonfill: 20 yrs teams and construction document production teams, he is Project Title: Ifamiliar with the guidelines and procedures for providing Senior Project Manager professional. services to State and County agencies. As Education: Senior Project Manager, he oversees the design, 1 production of contract documents, bidding ,construction • Bachelor of Science: administration, and the coordination of engineering design Architectural Technology Construction Management with consultants and government agencies. Florida International University I His project experience includes the planning and design of Relevant Experience: I residential communities, commercial and institutional • Shelter for Victims of projects. He is responsible for obtaining permit approval Domestic Abuse from the following departments, Health, Building, Zoning & • 20 Acre Automotive Complex Planning,I DERM, Fire and Public Works. TypicalRedevelopment including: projects • Parking Garage Ford under his direction include complex permitting and code Automotive Dealership evaluation issues. Recent projects include detailed Life • Service& Maintenance I Safety Code compliance as well as Accessibility Facilities for Ford Dealership assessments and implementation of barrier removal and • Miami-Dade Fire Rescue ADABarrier Removal Project compliance projects. and Zoning certification for the Phases I, II & III Miami, FL I continued use of Educational Facilities. • Miami-Dade Fire Rescue Station #40-West Miami, FL • Design Criteria Professionals Professional Responsibilities: for Miami-Dade Fire Rescue I As Senior Project Manager his duties include: Guide the Station #58-Tamiami, FL client and consultant team to succeed and achieve goals; • Northwest Community Center • Europa Biscayne Restaurant Lead the project team from commencement of project • Coral Springs KIA Showroom through construction completion; Guide the project • Legacy Development Offices process; Advise on formative decisions; Maintain high-level • Sawgrass Mills, Sunrise, FL- communication with client decision-makers; Support ADA improvements at parking tand entrances. Consultants, Designers, and Project Team; Facilitate the • Boys Dormitory&Visitor's resolution of all project issues; Manage, identify, define, Center at The Marian Center, I assign project risks; Ensure work plan is followed to meet Opa-Locka, FL the schedule, produce a quality project, and enable firm's • Ocean Cadillac, Bal Harbor Islands, FL -Addition & success; Ensure project decisions and communications are Renovations I documented clearly; Ensure the project process reflects • Stonecrest Marketing 2 Story the clients' and firm's goals and objectives. 3,000 SF Building Conversion 1566 Coral Way, Miami, FL • 7100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com I IJ Boffin&Associates •RFO#12-04-02 Page 58 IArchitects J . BONFILL & ASSOCIATE S Land Surveyors & Mappers Iill, Haydee FernandezRESUME Salazar Senior CAD Designer I I Haydee Fernandez-Salazar is a Senior AutoCAD Designer Experience: 14 yrs for J. Bonfill & Associates. For the past fourteen years in w/J Bonfill: 13 yrs her capacity as member of both design teams and Iconstruction document production teams, she is familiar Project Title: with the guidelines and procedures for providing Senior CAD Designer professional services to State and County agencies. As ISenior AutoCAD Designer, she designs and produces Education: contract documents, assists with construction • Bachelor of Architecture administration, and coordinates with engineering University of Miami, FL consultants and government agencies. Relevant Experience: I Professional Experience & Typical Projects: • Shelter for Victims of Domestic Abuse Her project experience includes the planning and design of • Parking Garage Ford I residential communities, commercial and institutional Automotive Dealership projects. She is responsible for permit coordination with • Miami-Dade Fire Rescue ADA the Health, Building, Zoning & Planning, DERM, Fire and Barrier Removal Project I Public Works Departments. She has extensive experience Phases I, II & III. in Commercial, Institutional and Residential Architecture. • Miami-Dade Fire Rescue Station #40-West Miami I Professional Responsibilities: • • Service & Maintenance Facilities for Ford Dealership • Design Criteria Professionals Site planning and design for residential and commercial for Miami-Dade Fire Rescue Idevelopments; Accessibility assessments; Barrier removal Station#58-Tamiami and compliance projects; Life Safety Code compliance; • Northwest community Center I Zoning Research; Documents for Zoning and Planning • Europa Biscayne Restaurant Presentations; Complete Working Drawings for Private • Coral Springs KIA Showroom Residences and Developments; Working Drawings for • Legacy Development Offices I Residential, Commercial and Public.Projects; Presentation • Law Office 5,000 SF - 2860 Drawings and Renderings; Detailed As-Builts for State Road 84 Dania, FL. Government, Institutional, Residential Facilities; Conducts • Law Office - 110 SE 6th Street I Field and Office Research for ADA Compliance Projects; 20th FL Ft. Lauderdale, FL Organization and Research for Specifications; Energy • Sawgrass Mills, Sunrise, FL - Studies for Compliance with the FL Energy Code; ADA improvements. I Condominium Documents for Residential and Commercial • Stonecrest Marketing 2 Story Projects; Radius Maps. 3,000 SF Building 1566 Coral Way. Miami. FL I I I 7100 SW 991" Avenue • Suite 104 • Miami, Florida 33173 • 7 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com I J Bonfill 8 Associates RR)#12-04-02 Page 59 I ill J . BONFILL & ASSOCIATES ArchifectsLand Surveyors & Mappers R E S U M E Gonzalo Paz Senior CAD Technician II I As senior CAD technician for J. Bonfill & Associates, Experience: 20 yrs Gonzalo Paz is well versed in the science of AutoCAD yy/J Bonfill: 13 yrs software and is familiar with all aspects of construction and Idesign work. Mr. Paz's education in Civil and Structural Project Title: Engineering provides the critical element required in the Senior CAD Technician design, layout and development of public and private Iprojects. His previous civil and structural engineering Education: experience enables him to organize and produce work that • Bachelor of Science is quickly translated to the consulting teams and Civil & Structural Engineering contractors. He is familiar with the code requirements in University of Havana,Cuba the production of construction documents. Relevant Experience: IProfessional Experience & Typical Projects: . •,Shelter for Victims of Domestic Abuse I His project experience includes the planning and design of • Parking Garage Ford residential communities, commercial and institutional Automotive Dealership projects. She is responsible for permit coordination with • Miami-Dade Fire Rescue ADA I the Health, Building, Zoning & Planning, DERM, Fire and Barrier Removal Project Public Works Departments. She has extensive experience Phases I, II & Ill. • Miami-Dade Fire Rescue in Commercial, Institutional and Residential Architecture. Station#40-west Miami 1 • Service& Maintenance • Professional Responsibilities: Facilities for Ford Dealership • Design Criteria Professionals I Site planning and design for residential and commercial for Miami-Dade Fire Rescue developments; Accessibility assessments; Barrier removal Station#58-Tamiami and compliance projects; Life Safety Code compliance; • Northwest Community Center Zoning Research; Documents for Zoning and Planning • Europa Biscayne Restaurant Presentations; Complete Working Drawings for Private • Coral Springs KIA Showroom Residences and Developments; Working Drawings for • Legacy Development Offices IResidential, Commercial and Public Projects; Presentation • Law Office 5,000 SF-2860 Drawings and Renderings; Detailed As-Builts for State Road 84 Dania, FL. I Government, Institutional, Residential Facilities; Conducts • Law Office - 110 SE 6th Street Field and Office Research for ADA Compliance Projects; 20`" FL Ft. Lauderdale, FL Organization •and Research for Specifications; Energy • Sawgrass Mills, Sunrise, FL - I Studies for Compliance with the FL Energy Code; ADA improvements. Condominium Document Projects. • Stonecrest Marketing 2 Story 3,000 SF Building 1566 Coral -- 7 100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • I 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com I - I J Bonfill&Associates RFD#12-04-02 Page 60 I A J . B O N F I L L & ASSOCIATES A r c h i t e c f s L a n d Surveyors & Mappers 1 ij� RESUME r Juan J . Bonfill Vice President / Professional Surveyor & Mapper I • Juan J. Bonfill has been in the private practice of Land Surveying in Experience: w/J Bonfill: I Miami-Dade County since 1980 and is recognized in the community for 42 yrs 22 yrs his experience and technical knowledge in the fields of land surveying, land planning, and construction. Project Title: • Surveyor of Record I Professional Experience&Typical Projects include: • Education: Boundary Surveys, Topographic Surveys, Hydrographic Surveys, Right • Bachelor's Degree - of Way Surveys, Utility Location Surveys, Control Survey, Civil Engineering I Construction/Layout, Platting & Subdivision, ALTA/ACSM Surveys, Santiago de Cuba Institute, Aerial Photogrammetry. Cuba I Mr. Bonfill has provided project management and supervision as well Licenses &Certificates: as the direction of field and office work. As the firm's Vice President • Professional Surveyor & and Surveyor of Record Mr. Bonfill is the Surveyor in Charge of all Mapper/Florida License Land Surveying efforts. All field and office Land Surveying work is PSM-3179 I performed under his direct supervision and technical direction. • Certified General Contractor FL/CGC-020513-Inactive Relevant Land Surveying Projects- Surveyor of Record: • Miami-Dade County Public Schools: 140 Facilities Projects at FIU: 1991- Present: • Miami-Dade College: At Maidique Campus: . Wolfson Campus • Panther Football Stadium Aquatic Center- North Campus • Parkview Housing Phase I I Medical Campus • SASC- Student Academic Student Services Building- South Campus Support Center • City of Miami: • Area between PG-5& SW Rockerman Canal 107`"Avenue Bayfront Park, Southside Park, Brickell Park Playground • Parking Garage PG-5 Mary Brickell Village Project • International Hurricane Coral Gate Roadway&Wall Research Center IRNV Surveys for Design and Construction • Law School • City of Hialeah: • Campus Bookstore Roadway& Drainage Improvement Projects • Frost Museum Hialeah Racetrack& Casino • FIU Classroom Building 1 • Miami Dade County: • Medical School Water Main Replacement Tunnel Project at Port of Miami • Student Housing Fire Rescue Department: 30 Facilities • Campus Support Complex 1 2007&2009 Annual Landfill Surveys for DEP • Presidents' House Homestead Airport/MDAD Strategic Airport Master Planning • Area between DM & PC MIA/MDAD Strategic Airport Master Planning • Parking Lot Areas Kendall-Tamiami Airport • Duplicating Building C-5 I Drainage Improvements to Broad Canal . Tennis Center Drainage Improvements to FEC Borrow Ditch Canal • Modular Buildings • City of Miami Beach: At Biscayne Bay Campus: ' North Shore Park and Youth Center • Marine Biology Building Beach Patrol Headquarters Building • Parking Garage PG-3 La Gorce& Nautilus Neighborhood Improvements • Parking Lot Areas I I I 7100 SW 99'" Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com I I J Bonfill&Associates RFC)#12-04-02 Page 61 I J . BONFILL & ASSOCIATES Architects Land Surveyors . & Mappers I ;. R ES U Ms E Eugenia L . Formoso Professional Land Surveyor & Mapper I . Eugenia Formoso has twenty years experience in Land Surveying. As Experience: w/J Bonfill: I the Senior Project Manager / Land Surveyor she is responsible for 25 yrs 20 yrs coordinating the daily production for both field and office personnel. She is well versed in AutoCAD software and is familiar with all aspects Project Title: of surveying and mapping work. Her prior education and experience in • Senior Project Manager I architecture and construction enables her to coordinate and produce work that is quickly translated to the surveying team. . Education: • Bachelor Degree Equivalency Professional Responsibilities: Ensured compliance with the scope of Silny&Associates Miami, FL I • Land Surveying work; managed project priorities, staff, schedule of work; provided technical assistance to the City/County/State agencies, • Bachelor's of Architecture utility companies, construction companies, consulting firms, attorneys Santiago Superior Polytechnic I and title companies; conducted the research of relevant recorded Institute, Cuba documents; ensured compliance with quality assurance standards; monitored the procedures for electronic survey data collection; verified Licenses & Certificates: the processing and balancing of field data; prepared legal descriptions • Professional Surveyor & I and sketches; analyzed title search information to determine property Mapper/Florida License boundaries; verified the correctness of all calculations, field PSM-6660 measurements and adjustments; interpreted all applicable State of Florida laws; reviewed completed survey work. Projects at FIU: 1991- Present: IRelevant Land Surveying Projects-Senior Project Manager At Maidique Campus:• Panther Football Stadium • Miami-Dade County Public Schools: 140 Facilities • Parkview Housing Phase I I • Miami-Dade College: • SASC- Student Academic Wolfson Campus Support Center Aquatic Center- North Campus • Area between PG-5& SW Medical Campus 107'"Avenue I Student Services Building- South Campus • Parking Garage PG-5 • City of Miami: • International Hurricane Rockerman Canal Research Center Bayfront Park, Southside Park, Brickell Park Playground • Law School I Mary Brickell Village Project . Campus Bookstore Coral Gate Roadway &Wall • Frost Museum R/W Surveys for Design and Construction • FIU Classroom Building • City of Hialeah: • Medical School Roadway& Drainage Improvement Projects • Student Housing Hialeah Racetrack& Casino • Campus Support Complex • Miami Dade County: . Presidents' House Water Main Replacement Tunnel Project at Port of Miami • Area between DM & PC Fire Rescue Department: 30 Facilities • Parking Lot Areas 2007& 2009 Annual Landfill Surveys for DEP • Duplicating Building C-5 1 Homestead AirporUMDAD Strategic Airport Master Planning . Tennis Center MINMDAD Strategic Airport Master Planning Kendall-Tamiami Airport • Modular Buildings Drainage Improvements to Broad Canal At Biscayne Bay Campus: 1 Drainage Improvements to FEC Borrow Ditch Canal • Marine Biology Building • Parking Garage PG-3 • Parking Lot Areas I 7100 SW 991h Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com I J Bonfill&Associates RFQ#12-04-02 Page 62 I iii:111 J . BONFILL & ASSOCIATES Architects Land Surveyors & Ma •ppers RESUME Orta Jannet Suarez Professional Land Surveyor & Mapper I Ms. Suarez has seventeen years experience in Land Surveying. As Experience: w/J Bonfill: I Project Manager she is responsible for coordinating the daily 22 yrs 17 yrs production for both field and office personnel. She is well versed in AutoCAD software and is familiar with all aspects of surveying and Project Title: mapping work. Her prior education and experience in architecture and • Project Manager I construction enables her to coordinate and produce work that is quickly translated to the different members of the surveying team. Education: • Bachelor Degree Equivalency Professional Experience & Typical Projects: Boundary Surveys, Silny&Associates, Miami FL I Topographic Surveys, Hydrographic Surveys, Right of Way Surveys, Utility Location Surveys, Control Survey, Construction/Layout, Platting • Bachelor's of Architecture & Subdivision, ALTA/ACSM Surveys, Aerial Photogrammetry. Central University of Professional Responsibilities: Ensured compliance with the scope of Venezuela- Caracas Land Surveying work; managed project priorities, staff, schedule of Licenses & Certificates: work; provided technical assistance to the City/County/State agencies, • Professional Surveyor & I utility companies, construction companies, consulting firms, attorneys Mapper/Florida License and title companies; conducted the research of relevant recorded PSM-6781 documents; ensured compliance with quality assurance standards; monitored the procedures for electronic survey data collection; verified Projects at FIU: 1991- Present: I the processing and balancing.of field data; prepared legal descriptions At Maidique Campus: and sketches; analyzed title search information to determine property • Panther Football Stadium boundaries; verified the• correctness of all calculations, field • Parkview Housing Phase I measurements and adjustments; interpreted all applicable State of • SASC- Student Academic Florida laws; reviewed completed survey work. Support Center Relevant Land Surveying Projects- Senior Project ManagerI • Area between PG-5& SW • Miami-Dade County Public Schools: 140 Facilities 107 Avenue • Parking Garage PG-5 • Miami-Dade College: • International Hurricane • Wolfson Campus& Medical Campus Research Center I Aquatic Center- North Campus • Law School Student Services Building- South Campus. • Campus Bookstore • City of Miami: • Frost Museum Rockerman Canal • FIU Classroom Building I Bayfront Park, Southside Park, Brickell Park Playground . Medical School Mary Brickell Village Project Coral Gate Roadway &Wall • Student Housing RSurveys for Design and Construction • Presidents' HouseRNV • City of Hialeah: • Area between DM & PC Roadway& Drainage Improvement Projects • Parking Lot Areas Hialeah Racetrack& Casino • Duplicating Building C-5 • Tennis Center I . • Miami Dade County: • Modular Buildings Fire Rescue Department: 30 Facilities At Biscayne Bay Campus: Homestead Airport/MDAD Strategic Airport Master Planning MIA/MDAD Strategic Airport Master Planning • Marine Biology Building I Kendall-Tamiami Airport • Parking Garage PG-3 Drainage Improvements to FEC Borrow Ditch Canal • Parking Lot Areas 7100 SW 991" Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • 183398 • www.jbonfill.com • J Bonfill&Associates , RFQ#12-04.02 Page 63 _ • -----sr\rpo1/4 I eNGINeeRING, INC. . ' CONSULTING eNGINeeRS 1 VITAL ENGINEERING, INC. is a Consulting Engineering firm that has provided for over eighteen years a broad range of mechanical and electrical engineering services to the construction industry for the engineering and design of commercial, industrial, utility, airport, hospital, educational, low and high rise residential, institutional, military, governmental and restaurant facilities; and, street and roadway lighting projects. ' The extensive professional experience of the principal of the firm range from feasibility studies to 'specialized engineering projects. • His participation in responsible charge for the design of large and diverse projects in the Boston, Massachusetts and South Florida areas, allows the firm to offer unique strength and quality of design. Services provided include computerized energy analyses, economic analyses, building air conditioning, heating and ventilating, plumbing, fire protection, fire detection and alarm, illumination, power, security, communication, energy management and emergency generating systems. The personal commitment and direct involvement of the principal in every project is the operating philosophy of the firm and the assurance offered to our clients of excellence in design and professional responsibility. Vital Engineering, Inc. involvement in sustainable design for buildings has t resulted in energy efficiency technology being applied to the plumbing, air conditioning and lighting systems design for projects; to obtain certification as a LEED Green Building by the U.S. Green Building Council. Representative projects designed by Vital,Engineering, Inc. and others of which the firm principal is the engineer of record, are listed as evidence of the firm's capabilities. 1 • • 1 I 7100 S'xx. 99th Ave. • Suae 202 • Mami, FL 33173 - Phone:(305)412-6000 • Fax(305)412-6005 • E-mail:vtalengLaol.com J BonnII&Associates R Fo#12-04-02 Page 64 REPRESENTATIVE PROJECT EXPERIENCE I . `Continuing/Miscellaneous Professional Services: Miami-Dade County GSA Miscellaneous Contract Miami-Dade County, Florida . Miami-Dade County P & R Dept. Miscellaneous Contract Miami-Dade County, Florida Miami-Dade County Aviation Dept. Miscellaneous Contract Miami-Dade County, Florida Miami-Dade County Public Schools Miscellaneous Contract Miami-Dade County, Florida City of Homestead Miscellaneous Contract. Homestead, Florida . . Florida International University Miscellaneous Contract Miami, Florida 1 United States Postal Service Miscellaneous Contract Miami, Florida - _ 1 1 I. eNGINeeRING, INC.. CONSULTING CNGINeeRS • _ J Bonflf-.AAssociates. • RFQ#12-04-02 Page 65 • • ICommunity Center, Recreational Facilities (Parks, Marinas, Etc.): City of Riviera Beach Waterfront Complex ` . 1 Riviera Beach, Florida Dade.County Youth Fair Main-Gate Building • Dade County, Florida Deerwood Park Recreation Building Miami-Dade County, Florida Fisher Island.Manna., • Miami Beach, Florida • Fisher Island Visitor's Dock 1 Miami Beach, Florida Jose Marti Park Multi Purpose Building MiamiFlorida Larry and Penny Thompson Park Restoration Dade County,Florida . • Mega Maze . Dade.County, Florida_ • I Miami Beach Youth Center Miami Beach, Florida. • Residences at Viscaya Marina Miami, Florida • I Skyline at Brickell Marina • Miami, Florida IWilliam's Island Restaurant Visitor's Dock North Miami Beach,Florida • • • • I . eNGINeeRING, INC CONSULTING 2NGIN22R5 - : .. - - - J Bonfill&Associates RFC)#12-0402 Page 66 I IGarages; Parking Decks: II 1800 Club Parking Garage Miami, Florida 1 Aventura Optima Parking Garage. Aventura, Florida . I Brickell Bayfront Club Parking Garage Miami, Florida Courthouse Center Parking Garage Miami, Florida 1 Dade CorrectionalInstitution.Maintenance Building Dade County, Florida 1 Dadeland North Metrorail Station Parking Garage .(10-story parking garage) Dade County, Florida DCAD Maintenance Facility at Miami International Airport. Dade County, Florida Gables Residential Parking Garage Coral Gables, Florida 1 International Harvester Truck Maintenance Facility Medley, Florida 1 M-DCPS — Central West Transportation Center and Bus Maintenance Facility Miami, Florida Merrick View Parking Garage Coral Gables, Florida - MIA Park 6— Surface Parking Miami, Florida Miami Green Parking Garage Miami,'Florida ' 1 I . VPCPt I eNGINeeRING, INC. CONSULTING eNGINeeRS - _ _ J Bonfll8 Associates . RFQ#72-04-02 •Page 67 • 1 NTW Service Center . Dade County, Florida - Palmetto Bay Village Center Parking Garage : ' Palmetto Bay, Florida . . 'Solid Waste Disposal Vehicle Maintenance'Facility • Dade County, Florida ISkyline at Bnckell Parking Garage: Miami, Florida ISkyPalace at MaryBnckelt Village Parking Garage Miami, Florida I • Tamiami Airport Service and Repair Station Dade County, Florida . • United States Post Office and Vehicle Maintenance Facility Miami, Flonda 1 - • 2NGINeeRING, INC. CONSULTING"2NGINC RS J Bonfill 8 Associates • RFQ#12-04-02 Page 68 • • I .I eNGINeeRING, INC. -- • CONSULTING eNGINeeRS • Nelson Vital, P.E., LEED® AP . Education: Bachelor of Science in .Electrical Engineering, • University of Miami, 1965. Professional Experience: Over 47 years of experience in consulting electrical • engineering services to industry, federal departments: state and local governments, . public and private institutions and private-developers. • Design experience includes over six years in responsible charge as director of electrical engineering .of public utility and of a large engineering/architectural firm in the Miami, ' Florida area, and twenty-six years experience in private • practice. • Executed projects include large office . buildings; industrial plants; shopping centers; water . and wastewater facilities; pumping stations; university buildings; detention facilities; hospital and medical 1 centers; and regional shopping mall. Design of , educational, institutional, low and high rise residential and restaurant projects. • IInvolvement in sustainable design for buildings, has resulted in energy efficiency technology being applied to the lighting system design for projects, to obtain certification as a LEED Green Building by the U.S. • Green Building Council. IAdditional experience in the energy conservation field, including energy audits, technical assistance analyses and energy conservation measures. Also experienced • in the design of street and roadway lighting-systems. 1 • • • 7100 S.W. 99th Ave. • Suite 202 • Miami, Ft.33173 Phone:(305)412.6000-• Fax:(305)412-6005 • E-mail:vitaleng@aol.com •1 J Bonfill&Associates .. . RFQ#12-04-02 Page 69 Registration: Registered as Professional Engineer in the. States of Florida, Pennsylvania, Mississippi, Georgia, Louisiana, Missouri, Alabama, Colorado; Indiana, Illinois, Kentucky, North Carolina, Tennessee, Michigan, _Maryland, Texas, Rhode Island, Ohio and Virginia. Professional Organizations American Consulting Engineers Council. Association of Energy Engineers. Florida Engineering Society. Florida Institute of Consulting_Engineers. Illuminating Engineering Society. Industry Applications Society. Institute of Electrical and Electronic Engineers. National Society of Professional Engineers. National Fire Protection Association. Project Responsibility: Principal . in Charge, Project Management and Electrical Engineering. 1 . 1 . . • IwillstriAI 2NGINeeRING( INC. CONSULTING 2NGINeeRS 1 - I J Bonfill&Associates RFQ#12-04-02. Page 70 • I I eNGINeeRING, INC. CONSULTING.eNGINeeRS . RAFAEL PENA, JR., P.E. Education: Bachelor of Science in Mechanical Engineering, University of Florida, 1970. I . - • Master of Engineering (Mechanical), University of Florida, 1971. Professional I Experience: Over 41 years of experience in consulting mechanical engineering services to industry, federal departments, state and local governments and private developers. IExperience includes seven years in responsible . charge as supervisor of mechanical systems • I installation for a large mechanical contracting firm in the Miami, Florida area, and eighteen years • experience in private practice. IExecuted projects include large office buildings; industrial plants; university buildings; detention facilities; large hotels; and recreational facilities. Design of educational, institutional, low and high rise residential and-restaurant projects. I - Additional experience in the energy conservation field, including energy conservation measures. I Registration: Registered as Professional Engineer in the States of ' Florida, Tennessee, Alabama; Michigan, Missouri and Rhode Island. . Professional • Organizations: American Consulting Mechanical Engineers. I Association of Heating, Refrigeration and Air Conditioning Engineers. Pi Tau Sigma Honor Society. I . . . . Project Responsibility: Project Management and Mechanical Engineering. - 1 7100 S.W.99th Ave. • Suite 202 • Miami, FL 33173 Phone:(305) 412-6000 • Fax:(305)412-6005 • E-mail:vtaleng@aol.com I • J Bonfill&Associates NRFON I FAH #12-04-02 Page 71 & PARTNERS CONSULTING ENGINEERS. INC. Samuel N. Nifah, P.E. President&CEO I .•, Overview - As President&CEO of Nifah and Partners Consulting Engineers. - Inc., Mr. Nifah is fully responsible for this Structural and Civil engineering design and construction administration sen-ices firm. Mi. Nifah has over 20 years of experience working as a professional Structural/Civil Engineer in Miami-Dade County. M . Areas of Expertise Employment Structural Engineenng/Project President and Principal Management/Principal-in- Charge Nifah and Partners Consulting Engineers. Inc 11/95-Num' Miami, Florida Years of Experience Total Responsibility for a multi-disciplined full service engineering With N&P: 16 YearsI design and construction administration sen-ices fum. With Other Firms:7 Years Education Staff Engineer . Pislorino&Alam Consulting Engineers 04/93— 11/95 I MS/Structural Engineering/ Miami, Florida Central University of Las Villas, Cuba Responsibilities included project coordination and management ' Post Grad Courses / Civil& design of various building structures. Construction phase engineering I Structural Engineering/ and inspections for the reconstruction of 86 fourplex buildings at the Florida International Village Homes at Country\Valk. Also included was damage University assessment, field investigations, repair design and drawings. I BS / Computer Science& Miscellaneous Civil Engineering Assignments. Mathematics / University of Ghana Structural Engineer I Miami1'W FloridaPublic Works Department 01/92—04/93 Registration/Certification Miami, Florida Registered Professional Engineer/ FL/ PE#48224 Responsibilities included project engineer for the Orange Bowl I Certified General Contractor/ FL/ COC#037878 modernization work ($15 million project) Damage assessment, field investigations and construction inspections at the Coconut Grove Threshold Building Special Convention Center after Hurricane Andrew. Restoration of various Inspector/ FL/ SI# 2036 recreational parks for the City of Miami after Hurricane Andrew. I Languages Structural/Civil Engineer English /Spanish / French/ Architects International. Inc 10/90-04/93 1 Dutch /Ghanaian Miami, Florida Participated in the analysis and design of various npes of structures such as steel reinforced concrete. prestressed concrete,wood,etc. Participated in the design/shop drawing review of the Metro mover project for the Brickell extension,downtown Miami. Hurricane • restoration of the Florida Department of Transportation -South Imaintenance yard. Miscellaneous Civil Engineering Assignments. I Page I of 3 I . J Bonfill&Associates RFQ#12-04-02 Page72 Samuel N.Nifah,Y.E. Page 2 of 3 Employment(Cont.) Structural Engineer . Cantor Seinuk Paig drArsoaiater 01/90-10/90 Miami,Florida Was responsible for design and coordination of high-rise buildings, computer applications using structural programs such as ETABS, ADOSS,SAP90,etc. Design handbooks in accordance with design ' methods of ACI 318.Threshold inspections.Project Engineer of multi-million luxury condominiums at Fisher Island, Florida. Structural Engineer/Civil Engineer Gomez-Pina Engineering 02/88- 12/89 Miami,Florida Design of low and mid-rise residential and commercial buildings and shopping centers. Design of reinforced concrete structures,steel, reinforced masonry block walls and foundations. Miscellaneous civil ' engineering works,site survey, and inspections Representative List of Projects Port of Miami Tunnel Project Review of Plans and Specifications for the Construction Trailers. Seaport Bond Engineers—Port of Miami Nifah& Partners was a subconsultant under this Contract at the Port of Miami. • Port of Miami Capital Improvement Assignments included Port of Miami Containers management and tie downs to comply with applicable codes. Parking Garge #4—Port of Miami Value analysis and Life-cycle costing of the structural and civil design t of this project MIA Mover APM System CIS Oversight with B&A at Miami International Airport New Northside Runway 8-26 at MIA: Civil and Structural . Engineering Services MIA Midfield Airport Rescue and Fire Fighting Facility: A/E of Record. Provided Structural and Civil Engineering Services,overall project management,threshold/special inspections and coordination. 1 Structural • Civil • Threshold Inspections I 8785 S.W. 16.5 Avenue,Suite 106,Miami,Florida 33193 7305.386.1002 F 305.386.3907 www.nifahportners.com • 1 J Bonfill 8 Associates RFQ#12-04-02 Page73 Samuel N.Nifah,P.E. Pat,e3of3 Representative List of Projects (Cont.) B-C Infill Project at MIA(MIA-745B):Threshold/Special Inspection Services for this project which extended Concourses A& B at Miami International Airport A-B Infill Project at MIA(MIA-747B):Threshold/Special Inspection Services for this project which extended Concourses B& C at Miami International Airport.Project Cost $70 million Overtown Transit Village:A two-tower facility(17 and 22 stories)that consists of build to suit offices and an 8 level parking garage.Served as - Structural Engineers of Record and Threshold Inspectors for Phase II Prima Luce: A condominium facility that consists of two 22-story towers. Served as Structural Engineers of Record. • Off Brickell: Mixed-use project that is comprised of a 10-story Hilton Garden Inn Hotel,9-story office building,2-story retail spaces and a 6- story parking garage. Served as Structural Engineers of Record. MIA Security Operations Control Center: Civil and Structural Engineering Services. Cargo Building 2224: Design and Construction phase services of a cargo building at the Miami International Airport. Total building area �. 121,130 square feet. Was responsible for the structural analysis and design of the entire cargo building. Construction cost $10.7 million. Oceanside#4,Fisher Island:Design and Construction phase engineering and inspections of a 10-story luxury condominium at Fisher Island, Florida. Participated in the structural analysis, design and inspections. Orange Bowl Stadium: Renovation and Modernization of the Orange Bowl Stadium at Miami, $15 million project. I was the City of Miami representative at the job site. Bayview#8, Fisher Island:Structural Design and Construction phase engineering of a 9-story luxury condominium at Fisher Island, Florida. Village Homes at Country Walk:Structural Design and Construction phase engineering for the reconstruction of 86 fourplex buildings at the Village Homes at Country Walk.Also included was damage assessment, field investigations,repair design and drawings. Construction cost. $20 million. Structural • Civil • Threshold Inspections 8785 S.W. 165 Avenue,Suite 108.Miami.Florida 33193 T 305.386.1002 F 305.386.3907 www.nifahpartners.com B IJ Bonfill 8 Associates S1NIFAH REQ M72-04-02 Page 74 _1 & PAR 'TNERS CONSULTING ENGINEERS. INC. IDavid A.Santamaria Structural Chief Engineer _ V r I • _ N • il - WORK EXPERIENCE: •i _.. Nifah and Partners Consulting Engineers, Inc. FL,2010-Present Chief Engineer ` Responsibilities include the engineering personnel supervision / coordination of structural design and development of construction documents for several projects EDUCATION: such as: - IFlorida Intl Univ.,Miami, FL •Joseph Caleb Center,New Courthouse Annex/Miami, Florida - Course concentration: •South Miami Heights Maintenance Facility/Miami, Florida •Design Highway Bridges: Bridge •Deerfield Station/Deerfield Beach, Florida Idesign using AASHTO •Hotel de L'Opera/Mikado, Downtown Miami, Florida •Advanced Foundation Engineering: Finite element design of The Raul Puig Group, P.A. FL, 1993/2010 foundations. Chief Engineer I •Advanced Geometric Highway Design:Hor.&vert.curves, hwy. Responsibilities include the engineering personnel supervision/coordination of capacity. structural design & development of construction documents for multi-million dollar •High-rise Building Design projects such as: I •Port Planning&Develop-ment. Port design methods. •Two 53 Stories,Villa Magna/Miami, Florida. A condominium tower designed with •Construction Management concrete shear walls and post-tensioned concrete slab system including a twelve •Timber Design story parking garage with 1131 parking spaces. . •Topics in Wind Engineering •Two 22 Stories. The Parc at Tumberry Isle / Aventura, Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system Master of Science in Civil including a four story parking garage space. Engineering-May, 1986 •Two 52 Stories. Everglades on the Bay / Miami, Florida. A condominium tower Memphis State Univ.,TN designed with concrete shear walls and post-tensioned concrete slab system Area of concentration: Structural including a seven story parking garage with 1,030 parking spaces. Inspection and Engineering repair recommendation of all the balcony railings was part of building contract. Bachelor of Science in Civil •Two 44 Stories. 500 Brickell/Miami. Florida. Two condominium towers designed • Engineering-May, 1982 with concrete shear walls and post-tensioned concrete slab system including a nine Memphis State University, Memphis, story parking garage with 940 parking spaces. Inspection and repair TN recommendation of all the balcony railings was part of building contract. •40 Story, Brickell Bay Drive / Miami Beach, Florida. A condominium tower I Certified Computer Programmer designed with concrete shear walls and post-tensioned concrete slab system and Operator, September, 1983- including a four story parking garage space. Control Data Institute,Memphis,TN •43 Story, The Continuum on South Beach/Miami Beach, Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system I Certified Building Inspector- a three story parking garage space. October, 1989-Code Enforcement& •8 Story, The Alhambra Grand Plaza/Coral Gables, Florida. A condominium tower Admin. designed with concrete shear walls and post-tensioned concrete slab system including a five story parking garage space. Certified Engineer in Training •22 Story, Brickell Bay Tower/Miami. Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a five story parking garage space. •58 Story. The Opera (Miramar Ill / Miami Beach, Florida. A condominium tower I designed with concrete shear walls and post-tensioned concrete slab system including a ten story parking garage with 795 parking spaces. Inspection and repair recommendation of all the balcony railings was part of building contract. • 33 Story, The Grand Flamingo / Miami Beach, Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system I including a seven story parking garage space. IPage 1 of 2 I J Bonfill 8 Associates RR)#12-04-02 Page 75 N I FAH David Santamaria & PARTNERS Page 2 of 2 (MIMING 111411116.INC. •31 Story-Miramar I/Miami. Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a nine story parking garage space. •30 Story, Portovita South Tower / Aventura, Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a four story parking garage space. •33 Story, Yacht Club at Portofino/ Miami Beach. Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a seven story parking garage.space. •32 Story. Yacht Club at Brickell II (The Mark) / Miami, Florida. A condominium 1tower designed with concrete shear walls and post-tensioned concrete slab system including a six story parking garage space. •32 Story, Yacht Club at Brickell / Miami, Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a four story parking garage space. •26 Story. Sunset Harbour—South Tower/Miami Beach, Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a seven story parking garage space. •27 Story. Sunset Harbour- North Tower/Miami Beach- Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a seven story parking garage space. •54 Story, Santa Maria Building / Miami, Florida. A condominium tower designed with concrete shear walls and post-tensioned concrete slab system including a four story parking garage space. San Martin Associates, Inc. FL, ' 1992/1993 Chief Engineer Responsibilities include the engineering personnel supervision / coordination of structural design and development of construction documents for buildings such as: •Dade County Aviation Dept.Bldg. 2207/Miami, Florida. •Nautilus Middle School-D.C.P.S./Miami Beach, Florida. A 4 Story concrete shear wall system structure with pre-cast joist and pile foundation. Cantor Seinuk/Puig&Associates FL, 1989/1992 Project Engineer&Head of the Computer Department 1 Responsibilities include the structural coordination/design of multi-million dollar high-rise building projects in Miami, such as: •42 Story, Bristol Tower Building. •12 Story, Federal Law Enforcement Building. •42 Story,A.N.A. Hotel Building. •5 Story,Continental Executive Building. •Several 8 to 12 story luxury condos located on Fisher Island, Florida Tasnim Uddin&AssociatesFL, FL, 1986/1989 Senior Structural Engineer Coordination, Struct. Design and Development of construction documents for projects such as: •Florida Intl University Engineering Building, Miami, FL •Dade County Aviation Dept.Concourse B, Miami, FL •Dade County Aviation Dept. Building 2200, Miami, FL 8785 SW 165th Avenue. Suite 108 *Miami.Florida 33193 • Tel: (305)386-1002 Fax:(305)386-3907 V:V>,•mvm6m\Wm'•Ihu}a 11<41.01Nasuu-4,11 Nemm',.nh N&I'I,,o I a•B Sanumuiallla•0.Smnamvu ma•aII.nIny.'2pr Vec 1 IJ Bonfill 8 Associates N 1 FAH RFQ#12-04-02 Page 76 1 r - & PARTNERS CONSULTING ENGINEERS. INC. I f , ^ 1, Ronald Duran P.E. -T Senio,Structura/&CM/Engineer 1 r = li �, ` Overview -`'". : Mr. Duran has over 35 years of experience in the design of many different types e ', r./ , of structures for Metro-Rail projects, bridges, civil structures, buildings and I t"Mf temporary structures for construction equipment, forming and others. , c t. Employment Nifah and Partners Consulting Engineers, Inc. -Miami, FL March 2010-Present I Areas of Expertise The Raul Puig Group, PA. -Miami, Florida 2004-2010 • Structural Engineering Kan Mehta&Associates, Inc., Pompano Beach, FL 1997-2004 The Raul PuigGroup, PA. -Miami, Florida 1994- 1997 • Civil Engineering Services for Companies in USA, Bolivia& Mexico 1974- 1994 • I Years of Experience Special Consulting Services Structural Plan Examiner for Dade County Building Dept. 1994- 1995 With Other Firms: 36 Years Plant Inspector of Wood Truss Mfg. in So. Fla. for Truss Plate Institute. 1994-95 IEducation Representative Projects » UNIVERSIDAD MAYOR DE 1. Metrorail and Transit Projects SAN ANDRES in La Paz, • Tren Urbano Project-San Juan, Puerto Rico: Project Management I Bolivia, with Major on Oversight (PMO) for Fed.Transit Admin. control of 2-billion construction proj. structural engineering and Remedial work design assistance was performed also. Minor on Civil/Sanitary • Metro Rail Extension: Miami-Dade Transit. Analysis and preparation of engineering. 1969- 1974 remedial works to correct camber-generated problem. St'l box girders. I .I POLITECNICO DI MILANO, • Miami Downtown Station Preliminary Studies: New Mall under Metrorail Italy, Master on Reinforced combined with bus station, a Miami-Dade Transit project. Cont. Bridge & Bldg. Struct. • "The Lofts" building over the Miami Metrorail: Metrorail protection structure 1978-79 against accidental fall or throw of materials or objects from the building. I + COMPUTING SELF- • Meirorail 22 Stations- Stair railings Repairs: Miami-Dade Transit Dept. for EDUCATIONin USA, Italy • retrofitting of railings update to Code. , , • Dadeland Extension Corridor Roof Struct.: for Dadeland Station, Miami, FL. Mexico and Bolivia. • Bus Stop Conceptual Design: 3 conceptual struct. designs presented. Miami Programming&operation of I several operating systems, 2. Bridge Engineering (VECP= "Value Engineering Change Proposal") development of eng. design • Railroad Bridge over New River for Tri-Rail Project: Prelim. analysis and programs, operation of cost comparison, plus VECP studies on proposed foundation. Tri-County, FL I software for bridge and building struct., foundations, • M.I.A. Upper Vehicular Drive and foundation: 50-span comp. steel,including future People Mover columns; roadway, geometry, auger piles. Miami, FL post-tensioned concrete, • Pedestrian Bridge for Miami-Dade Transit: US-1 and Douglas Road. Fla. etc. Skilled in AutoCAD, • VECP design for Southern Blvd. bridges over Stub Canal/SFRC and 1-95: I construction accounting • programs, MS Office, etc. • Re-designed bridges using prestressed cont girders instead of steel.W.P.B. • Bridge on 97th Ave. over SR836 Foundation Re-design: VECP service.The original pile foundation was redesigned for continuous mat foundation at piers. Registrations • Bridge on 97th Ave. over SR836 Value Engineering: Presentation proposed I . Registered Professional to Miami-Dade County Public Works Dept. with savings of up to$4 Million. Engineer: FL PEf136075 • VECP design for Southern Blvd/Australian Ave., Bridge `C1'(5 spans) and ramp 'D' (3 spans): Prestressed conc. Beams, FDOT-IV Proj. Palm Bch. • Gen. Contractor(Inactive) • VECP design for Okeechobee Bridge/I-95: 3-Span. FDOT-IV. Palm Bch., FL I • Continuing Education Provider No. 004840 • Bascule steel bridge structural analysis and repair design: For the Jewfish Creek at the Intracoastal Waterway, FDOT -VI project. Monroe County, FL • Bascule Bridge Inspection: works for Rehabilitation design on Jewfish Languages Creek, Structural steel, FDOT District VI project. Monroe County, Florida. I • Read and write: English/ • Bascule steel bridge: US-1/C-111 canal,joint repair design. Miami-Dade, FL. Spanish/Italian • Regency Bypass: Conc. bridge designs. Curved, 3 spans, Jacksonville, FL. • Read: Portuguese • Prestressed brdg. beams failure after accident: Remedial work M.I.A. FL. IPage I of 2 I J Bonfll&Associates E N 1 FAH Ronald #12-04-02 Page 77 Ronald Duran P.E. & PARTNER 5 Page 2 of 2 <eARI N IL I u. • A variety of civil-struct. design works for several Bridge Contractors 1 Bascule bridges remedial works, forming, mobile crane supports, concrete and steel sheet piling, tressle structures, retaining walls, and more. 3. CiviUStructural Engineering (VECP= "Value Eng. Change Proposal') 1 Bulkhead retaining wall VECP: MSE and steel sheet pile walls.W.P.B., FL. • Analysis, review and improvement of sheet pile containment wall VECP: Palmetto Expressway and NW 36i°Sl. Intersection project. Miami, FL • Clubhouse at Crandon Park Golf Course: 4-acre parking lot and building area re-grading and drainage, and 2/3-mile of water main extension. • Peanut Island Improvements: Heavy timber floating observ. deck.W.P.B., FL • Seawall at Jose Marti Park: FDOT-VI project for City of Miami River-Walk. • Civil and structural design for Crandon Park Marina Phase II: 118 boat ' slips; concrete floating docks, prestressed concrete guide piles. Miami, Florida. • Civil and Struct. Design for Haulover Marina Improvement Ph. I: (First Design), 150 slips, conc. fixed piers, wave baffle, breakwater systems. Miami • Drainage VECP: Replaced 1-75 box culvert with 60"J & B pipe.Tampa, FL. • Deering Estate Park Historic Preservation Area: Floating boat launching dock and exist.dock restoration and imprvmt. Miami-Dade Park & Rec. Dept. • Rinker Crane Unloading System: 700 ft post-tensioned cont. structure for Gantry suction crane needed for unloading of cement. Port Everglades, FL. • Concourse F to G Wrap-Around, M.I.A.: Drainage& Industrial Waste Syst. • A variety of civil designs for Contractors and Gov't agencies: Such as drainage& dewater, dock restorations, Gabion retaining walls, Parking lot, etc. B 4. Building Engineering Experience (P.T.Mi=Post-Tensioned Conc.) • Paramount at Edge Water: 52 stories residential ami, FL. • Terrazas at River Parkk: Double tower(27/20 stories). Miami, FL. • Everglades on the Bay: Dbl. tower 53 stories each. Miami, FL. . • Aventura Marina: Construction consulting services. 19-story.Aventura, Fla. • Villa Lofts: Construction consulting services. 12-story.West Palm Beach, FL. • Review of Residential Structural Design: For design audit. Broward Cty. FL • Complete struct.design of Lynx NOB (New Operating Base), Orlando FL • The Setai: 42-story luxury apartment building at Miami Beach, Florida. • The J.W. Marriot Hotel and Barclay Fin. Ctr.: 21 & 32-Story. Miami, FL. • IL Villagio: Luxury condominium at Miami Beach, FL. Coastal Construction. • The Yacht Club: Located at highland Beach, FL, 11 Stories. • Carnival Cruise Lines Bldg: Addition, 7-story, 200,000 SF. Miami, FL. • Bella Vista at Porto Vita: 8-story concrete, Aventura, North Miami, FL. • Partial design works for The Yacht Club: At Brickell, Miami, FL • Justice Center: 17-story, 7 story pkg. garage plus 10 office stories, Miami, FL • 120 bed Nursing Home: For the Veteran Administration,W. Palm Beach, FL. • Beth Torah Congregation Ctr. Complex: School,church, assembly. N.Miami • The Miami Center Parking Building Addition: 12-story conc. Miami, FL. t • Partial design works of Hi-rise: Bristol Tower. ANA Hotel; the Santa Maria Building (54-story) and more. Miami, FL. • Concourse F-G Wrap Around at M.I.A.: 4-story bldg. expansion. Miami, FL. ••Restoration of Biltmore Hotel: Design and Insp. 17 floors. Coral Gables, FL. • N. District Police Sta. pkg. struct. & drainage: Design and insp., Miami, FL. • Numerous resid. designs for new houses: Restoration, additions and more 5. Projects on StructiCivil Eng. Design in other countries Mexico: Re-Installable Steel Structures: Guadalajara; Fabric. & Install. Bolivia:Railroad cont. bridge; San Borja Airport Terminal; Cochabamba Bus Station; Santa Cruz: Public Works Water& Sewer Dept.; 10-Story Building Struct. Design, Const. Eng. Inspection for Sewer Systems in cities of Montero, Vallegrande and Camiri. 8785 SW 165'"Avenue.Suite 108 *Miami.Florida 33193 • Tel: (305)386-1002 Fax: (305)386-3907 kktnw'n,z:l,mmen,M,jxi I4u'eVY.I 11lwm4V,1 k_wm•-ah N. I'rnpann Inr.NVfumw Miran(2pyh):b: 1 I i N I FAN R Q#12 Associates Page 78 II L-, & PARTNERS CONSULTING ENGINEERS. INC. = Erlan Palenzuela, E.I. I Structural& Civil Designer I # t 4 )y;_ t WORK EXPERIENCE: t 1 ,t ,Vifah and Partners Consulting Engineers, Inc. f - tn^ s:_,::, »,. Structural & Civil Designer • South Miami Heights Maintenance Facility(WASD) • Joseph Caleb Center Courthouse Renovations & Extension: EDUCATION: • Hotel de L'Opera/MikadoB.S.Civil Engineering, Universityotayana, Cuba, The Raul Puig Group, P.A. 1986 1 Engineer Intern, Fla.,2001 Structural &Civil Designer GRADUATE COURSES Analysis and design of concrete and steel structures, with emphasis on finite Windows Applications: Excel, element modeling of high rises and foundations. Developed, processed and Words.PowerPoint, 1997— coordinated structural computer models, pre-analysis and dimensioning of I Miami Dade Com-munin elements, wind tunnel result analysis and permit process. College. Miami Fla. AutoCAD Advance Course, • Port of Miami Tunnel Project —Review of Plans & Specifications for I 1994—Ministry of Cons- Construction Trailer [ruction,Camaguey, Cuba • Hotel de L'Opera.40-story Design and Analysis of • Camillus House, 6 large sections, 6-story each. Computer Systems, 1992 • Villa Magna.double tower 51 and 52 stories Ministry of Construction, • Red Road Commons. 5 large sections,6-story each. Camaguey, Cuba • Everglades on The Bay,double tower 50-Story Visual Basic Programming, • Kress Building, 27-story 1 1991 —Ministry of • Construe Plaza on Brickell, 57-story on, Havana, Cuba • 1390 Brickell Bay Drive,47-story Auto lisp Programming, 1990 • The Opera Tower(Miramar Center Phase II), 58-story (Value —Ministry of Construction, Engineering) Havana,Cuba AutoCAD for Engineering, CRA Clarke, Inc. 1989 I Ministry of Construction, Structural & Civil Designer Havana.Cuba • Addition For Fundora Residence • Addition for Coro residence SPECIAL SKILLS • West Perrine Park I Proficient in Engineering e• Cracker Barrel Drainage related computer programs g such as: ETABS,SAFE, • Watermen Homes.Jordan's landing Drainage ENERCAL,STADD, SAP, • Key Point, Florida City Drainage RAM,and PCA,AutoCAD, I • Uleta Fire Station oft\Word,Auto lisp • UletaOil Inc, Gas Station Programming,and Excel. Ewing • Charles Deering Estate,Mangrove, Boardwalk Bridge Alternate: Structural Design I . • T Hanger for Plane Shade, Inc: Struct.design and devel. of const. dot's. (Foundation & Steel Col's) • Concourse J, Miami-Dade Aviation: Structural. Design for Steel Column. IFoundation & Slab. • West Kendall Fire Station: Struct. design, Drainage. Sewerage and Water Page I of 2 I J Bonfill&Associates 1 FAI'1 RFa#12-04-02 Page 79 & P A R T N E R S Erlan Palenzuela COISOI•I..•,o1•ll••. .<. Page 2 of 2 supply System design. • King's New Habitat, Monkey Jungle: Paving, Driveway renovation. • Jackson Memorial Hospital Shop Renovation: Paving, Driveway renovation. I . Kendall Soccer Park: Structural Design. • Bayshore Clubhouse: Struct.design and devel. of const. doc's. (Reinf. Masonry, Steel Col's. & Found.) • Fire Station#9 and#37, Metro Dade Fire Department: Paving. Driveway renovation. • GSA Vehicle Inspection Station, GSA: Paving, Driveway renovation. • Booker T. Washington Sr. High: Structural Design. • GSA Telecommunications Bunker, GSA: Paving Driveway renovation. • Pinnacle Palms, Pinnacle Housing Group: Structural Design & development of construction doc's. • Cutler Ridge Park, DCPR: Structural Design. Hydraulics Research Institute Havana, Cuba 1992/1995 Senior Project Engineer Management of major projects performed for both the Ministry of Agriculture • and the Department of Transportation. Projects included irrigation and drainage canals, roadway drainage, pumping stations, bridges, river engineering works, I • sewer systems and hydraulic pipe networks. Hydraulics Research Institute Project Manager/Project Engineer Design and Construction supervisor of numerous Hydraulic and Structural works performed for the Ministry of Agriculture and the Department of Transportation. Projects dealt with water supply and water resources, urban and rural drainage systems. river engineering works, pipe networks,energy dissipation structures, hydraulic control structures, micro-irrigation systems, ponds and pumping stations. Hydraulic Research Institute Pinar Project Engineer/Quality Control Supervisor Design and Construction supervisor of numerous Hydraulic and Structural works performed for the Ministry of Agriculture and local government. Projects include irrigation and drainage canals, earth dams, drainage ditches, water supply systems. storm and sanitary sewer systems, energy dissipation structures. river engineering works, waste water treatment plants. micro-irrigation systems. pipe networks and so on: • Re-channelization of Almendares River. Havana,Cuba • Medical Institute Calixto Garcia. Havana,Cuba • Drainage of the Following Cities of Havana, Cuba • Medical Institute of Investigation CENPALAB. Havana, Cuba 1 1 8785 S.W. 165th Ave..Suite 108 •Miami. Florida 33193 ♦ Tel:(305)386-1002 Fax:(305)386-3907 1 -- - - - -• _ - J Bonfill8 Associates RFo912-04-02 Page 80; a 1- >' sf o r !TS' r ri>� c t ! Y s .0 .i �-- +--r !•:I� .a.1PT^, 1 n�A:: , F�i'^.e� M.2,PAS - .di+S. f �- n-W.4M' ,.f }3,.o 1 x..e , %/ ^AJ S"fi^3144. e,7 rx V i ` 6 TATE OF FLORIDA +r iV ;X �0�17' �' '^ � �Jau.�•` ��J $ L # �$�rJ� �nw `l 'CV"'�v-'tx.t �F 4!-^,4.•`11% 7 ,'Yric. DEPART .(r•- ! -I:",. i' ;-- -:✓ -Ss', S ANL+'ki�i'"'rti-&kt [ION e �?<,-j?�IYG- ',sr#,.e ,n„e „ a..b �,MEPARTMENTaiOF wBUSINE6SS,AND PROFESSIONAL•�REGYILATSON Vit ,,. y.,,,-� -ly . ? ,, zJ lv�� �ti s�,r("� 'lktg�BOARD�fOFN ARiCAIT8C4RIRE R IeeTERIOR DESI41N P>' ` SEQ#LII020101(396 4k LICENSE NBRn rit S7Ar'c 'aD i.th'°E`r^{i -J Bonfill 8 Associates RFQ#12-04-02 Page 81 of SWa. Florida Department of Agriculture and Consumer Services °.e Division of Consumer Services Board of Professional Surveyors and Mappers 2005 Apalachee Pkway Tallahassee,Florida 32399-6500 800HELPFLA(435-7352)or(850)488-2221 • ,~cop isE February 6, 2011 • • .1 BONFILL AND ASSOC,INC 9360 S VV 72ND ST-STE 265 MIAMI,FL 33173 SUBJECT: Professional Surveyor and Mapper Business Certificate#LB3398 Your application/renewal as a professional surveyor and mapper business as required by Chapter 472,Florida Statutes,has beenreceived and processed. • The license appears below and is valid through February 28, 2013. You are required to keep your information with the Board current. Please visit our website at www.800helpfla.com/psm to create your online account. If you have already created your online account,you can use the website to maintain your License. You can also find other valuable information on the website. If you have any questions,please do not hesitate to call the Division of Consumer Services,Board of Professional Surveyors and Mappers at 800-435-7352 or 850-488-2221. S iDetach850- • 4 •Florida Department of Agriculture and Consumer Services Division of Consumer Services License No.: LB3398 Board of Professional Surveyors and Mappers Expiration Date: February 28,2013 ., 2005 Apalachee Pkway Tallahassee,Florida 32399-6500 S • Professional Surveyor and Mapper Business license Under the provisions of Chapter 472,Florida Statutes J BONFILL AND ASSOC,INC 9360 S W 72ND ST-STE 265 MIAMI,FL 33173 ADAM H.PUTNAM COMMISSIONER OF AGRICULTURE This is to certify that the professional surveyor and mapper whose name and address are sbawn above is licensed as required by(haps 472.Florida Striates. 1 I -J Bonfill 8 Associates RFQ#12-04-02 Page 82 „f Florida Department of Agriculture and Consumer Services - Division of Consumer Services g. E-i • Board of Professional Surveyors and Mappers ":1,-17;71,:',7------4:'-- ` p 2005 Apalachee Pkway Tallahassee,Florida 32399-6500 .= `=- ' 800HELPFLA(435-7352)or(850)488-2221 coo wa February 6,2011 . • JUAN JOSE BONFILL 9360 SW 72ND ST STE 265 I AMIIAMI,FL 33173 • IDetach Here SUBJECT: Professional Surveyor and Mapper License#LS3179 .- � - +-a•=-_=�*. Florida Department of Agriculture ="=gt Services and Consumer I Your application/renewal as a professional surveyor and mapper 'p"� �'.'.' ,'p' Board of Professional Surve ors as required by Chapter 472,Florida Statutes,has been received and -- and Mappers y processed. • I IS3179 The licence appears below and is valid through February 28,2013. Professional Surveyor and Mapper You are required to keep your information with the Board current. JUAN JOSE BONFILL I Please visit our website at www.800helpfla.com/psm to create your online account. If you have already created your online account.you can use the website to maintain your license. You can also find other IS LICENSED under the provisions of Ch.472 FS . valuable information on the website. Expiration date:February 28,2013 IIf you have any questions,please do not hesitate to call the Division of Consumer Services,Board of Professional Surveyors and Mappers at 800-435-7352 or 850-488-2221. • IDetach Here I XFlorida Department of Agriculture and Consumer Services Division of Consumer Services - License No.: LS3179 Board of ProfessionalSurveyors anMappers d . � Expiration Date: February 28,2013 I =; .>ii_ 2005 Apalachee Pkway Tallahassee,Florida 32399.6500 • IProfessional Surveyor and Mapper License • Under the provisions of Chapter 472,Florida Statutes - JUAN JOSE BONFILL • 9360 SR'72ND ST STE 265 IMIAMI,FL 33173 G//9wY� ADAM H.PUTNAM COMMISSIONER OF AGRICULTURE I This is so certify that the professional surveyor and napper otiose name and address are shown above is licensed as required by toper 472,Florida senates. I • I J Bonfill 8 Associates RFQ#12-04-02 Page 83 . Florida Department of Agriculture and Consumer Services 0 Division of Consumer Services - ` �,_ Board of Professional Surveyors and Mappers 4 ,-- 2005 Apalachee Pkway Tallahassee,Florida 32399-6500 800HELPFLA(435-7352)or(850)488-2221 1 4~000 T February 6, 2011 EUGENIA L FORMOSO 2243 SW 153RD PATH IMIAMI, FL 33185 Detach Here SUBJECT: Professional Surveyor and Mapper License#LS6660 ; `�,,f. .r•- n.. Florida Department of Agriculture !-91 and Consumer Services Your application/renewal as a professional surveyor and mapper as Board of Professional Surveyors as required by Chapter 472,Florida Statutes,has been received and and Mappers processed. - . LS6660 The license appears below and is valid through February 28,2013. Professional Surveyor and Mapper You are required to keep your information with the Board current. EUGENIA.L FORMOSO Please visit our website at www.800helpfia.com/psm to create your I online account. If you have already created your online account,you can use the website to maintain your license. You can also find other IS LICENSED under the provisions of Ch.472 FS valuable information on the website. Expiration date:February 28,2013 If you have any questions,please do not hesitate to call the Division of Consumer Services. Board of Professional Surveyors and Mappers at 800-435-7352 or 850-488-2221. Detach Here • I 9 Y --%), 7 Florida Department of Agriculture and Consumer Services ' �; Division of Consumer Services License No.: LS6660 y Board of Professional Surveyors and Mappers Expiration Date: February28,2013 ti'-t s'a-- - P F:';�,,��t,_;st_ 2005 Apalachee Pkway Tallahassee,Florida 32399-6500 ' IProfessional Surveyor and Mapper License Under the provisions of Chapter 472,Florida Statutes EUGENIA L FORMOSO 2243 SW 153RD PATH A 1 . MIAMI,FL 33185 C//�� rm • ADAM H.PUTNAM • COMMISSIONER OF AGRICULTURE ibis is to certify tint the professional surveyor and rmpprr whose mar and address are shown above is licensed as required by Chime 472.Florida Sianrtes. I t J Bonn11 8 Associates RFQ 412-04-02 Page 84 04A Florida Department of Agriculture and Consumer Services . Division of Consumer Services • 1-(; g. iarifisS Board of Professional Surveyors and Mappers 4 Ptt'-- 2 _4, • - : 2005.Apalachee Pkway Tallahassee, Florida 32399-6500 .5 800HELPFLA(435-7352) or(850)488-2221 I coo WET" January 4, 2011 ORIA JANNET SUAREZ 4761 SW 163RD PL 1 MIAMI, FL 33185-5117 • iSUBJECT: Detach Here Professional Surveyor and Mapper License#LS6781 �'•r.,' Florida Department of Agriculture ` ��. and Consumer Services I • Your application/renewal as a professional surveyor } wand mapper . - Board of Professional Surveyors as required by Chapter 472,Florida Statutes,hasbeen received and and Mappers processed. LS6781 I The license appears below and is valid through February 28, 2013. Professional Surveyor and Mapper You are required to keep your information with the Board current. -ORIA JANNET SUAREZ I Please visit our website at www.800helpfla.com/psm to create your online account. If you have already created your online account,you can use the website to maintain your license. You can also find other IS LICENSED under the provisions of Ch.472 FS valuable information on the website. Expiration date:February 23,2013 IIf you have any questions,please do not hesitate to call the Division of Consumer Services,Board of Professional Surveyors and Mappers at 800-435-7352 or 850-488-2221. I . I . Detach Here I Florida Department of Agriculture and Consumer Services Division of Consumer Services License No.: LS6781 ,t Board of Professional Surveyors and Mappers Expiration Date: February 28,2013 ,'-7s:_ - i?;'t;4 :, 2005 Apalachee Pkway Tallahas ee,Florida 32399-6500 _g:' tiS • Professional Surveyor and Mapper License Under the provisions of Chapter 472.Florida Statutes IORIA JANNET SUAREZ 4761 163RD PL ��<--se-d� 1 MIAMI,,FL 331855117 ���YYY ADAM H.PIJTNAM COMMISSIONER OF AGRICULTURE IThis is to certify that the professional surveyor and capper whose oars and address are shown above is licensed as required by Chap=472.Florida Stances. I I J Bonfill&Associates 5 • RFC)#12-.04-02 Page e .T ......-•:,./.......-.,.,.... :,. m . . 11±1c:gg-i..C&..8!•;:'.: :"Z\--5.:Z.L'yl.'‘ifr". .;:Z .:-1.:;!:.: %-.1: te'd1;444-Yit.4q::i: Z4i*:':1 11.1.1:::: : ! r .i7:: 2.:j.41t ii -.1 ..1.?"-IC7-7. .C.;•Tii. ›..f;7% 7•.1:,;7,s: ,-,.-.;;-- „ ,4,--.,-z.,-4:2;,,z.r4.1ctn-3v,r , E,,, -44.7,-„D.,:: 2-:-::,,. ;, .5.,: ,.F:T.z4--,s- 4:1kcp-4.=:v*-:,;:tic,k;;:i- , .-•.::,:,..f 5::,.:5 . z:ti.y-esTs,,i1--..,,,,,2031.,73:,;-4:::411..,...,;;;Te --11...... .-,-:.,,::::..-,:::=:-..,..,-J:-3,::- ..1;:i-F. ,7,zi.G;:zo-....-.,--k-4. ..2,J;.T.-;f1:.:-z-ti.t. I :- 7;:•Tit.::::::--r-,: _ .,...:.,..,.. .....a— 4:::-•„..:±,'..-..-,Z7....'-..1.fi:2..t:'':!:'t.::::::y:-....:1I :-...1„.5:,...:4:.'-;„5.-,*t,51,i95qt:-.1:-,t10_c•31.%pt.r - .:1i1a,A'.r.E4p'.1,,j1',L1.r:-,:.4,7,1-4‘F71_•;,11:;.ff3:r-21.1..-,;.7.:.,.J1 " z ' ;y : -'- - . a 1 .r.:... ..;-..".....; ,_..J:/...:...t.:..Wsla--3:T -.•::::".-Iti$..-rse,14:±Z;I:.:1171ti: z.i;.' ,..:A.;.,,,..,.-.., ;-.....:,,,..fi 3$..,..-_,'. - i •'a a. 'T'...r.S;.'7:Q11`1;="l'AI2k -. .;521.'177t.:..Vgirk ----t":.;.--.... !t7-8:1:5;0;:l..;:.':'‘*:.?•5-.'i;.- ‘''''i . - •-:•::::'-s")--iikk q't ","•2"5. ...--::::',,? '.?•2;7'''4!:::f.... .-:::r•_. .:-..'5:4,11. :1;ii './.'''.1M1‘.:4-';;': --c.,.+47'.7-.:;:.75P---2i:.f.s'sl',.;.:,7•:!-1 •.;-;. .:;-... ::-.- :-.114;,.m.A,4 ,,-.!9; .-?-,-. ..1 -.4-•:ti,.--.15::.?1;;-:.),;" 1.1.A„ :.:-.-?..;:11:::.:::i.::::::,:-:,:.. iko.s- ;;:.c.i....„a;”- :., _-_,-i-_,Lf.,. ..---•-_-:::. a i;: lit#4:11? • . --,— -,-- .i.,.•,,t-,L.:' cc/ e,-,.--,:ip;sift.....- -, ,.21:-../93,3.:i.,:-,,,E.:,-,..‘ .-..,c...--,_ .-, -. •-...meta-- ..; ...*.-tt.1:10.:;4=-..y.f;7,1 %.': '::•;•;','•':•-•;•:•Ii•I•:•:-P:::---.:-.4••:. •,. ,.f.--k I *.:.,,c .4rit \.".1''. 'f::-.‘;t:1--\.--c,::: __,...;4.:*:,3,t„,,r. s.cp;.,'-t:-..-.:„-..:„..,:;--c. % , ,..-,-.7.,...rtc-f:.7. 427.., t4`a%ig-- ;.-C.‘=.01.:;;;?•).3-_ ---:::: Siaiaik .- Iga13?.‘(',ifler1 ‘.!_tiffj::-Ij:;-)Pir.i.i -;...,:.;„.-- --_,_-.--(-.±-..\±,.s... .;,;(7,....,,- - :.g-t '...:0 ..•Ecia::-......./IS: . v: ...s..,1.4,;•;.....j7/./:;,:;J::,..tri4..3);:i,.± :j:1Si?....;:-.' r..-?!.. (:1C.214- rlia.Lit' 4?...:;;C:r.f-IPti-2...il:.(114;;.* S.(.1 li ;:. 7:1?=1H.-7-Lifia:Iciti:;;;:gc"kil-4.,c264::IgifiE _ TelKJ.Hrif,---Wlfr..43%., • --- WY-.c a '03, ---%tro'.,F,,A1,7:1-::7:1,-..-cfn;iy.lteta {1;23c.,::',"--. l;-., rIFL.,',7.7:,?..7.4),,f'cric:75;:iet:1,:zt;:t1`;:::.1"-ii;c• I atiN o' . . ftQL6'.::!:.4::: .;•14.:r..::7;,.4",-;L:::;:::,Z.:.:Lipi'.--,z;t : - Lem , ...4,...,./.,:c.--,-,.,--0.6::..,.:,,,s0:-=-.:-;,-,- .--: :,.-r--4.--:---; o. ,.4.- .7.-., V :;-.11::::,:.•.,:,..:•,:::,-- ..:-...f.ss,-.-. 4, 7,,t44-tn.;',4-7i,j5.;:?(P rr.h.::::11:-inr:-.::- f. &.-T-fr t* , -ti./t*:\-.21- .3C:141 --4 I ,..;•:.': -1:-..::::.A'' .::,..,; ... . • U 1 1 • I -eNGINeeRING, INC. , - . . - . 1 CONSULTING eNaNieeRs I - .r• N-- -1:-.1-77,-.-::.-::..c.if: ..--.:7:1.:7;:::::.:.;:::::.y.-? ....-212'.' -' /I I oNyt.3-11)1 :eI91N..-.: I• I. AC OJ Bonlill&Associates RFO tl12-0 02DATE U » 4,..---- BH CERTIFICATE OF LIABILITY INSURANCE 03/12112 1 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERT1FICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE-COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING.INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER - I IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the policy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER CONTACT ACEC/MARSH 800438.1391 NA/FE: 701 Market St.,Ste.1100 080{214173 tPaHeONE FAX St.Louis,MO 63101E: ARESS: INC."'1' Kevin P.Woolley PRODUCER CUSTOMER IDI:VITA-01 INSURER(S)AFFORDING COVERAGE MAIC/ INSURED Vital Engineering,Inc. NSURE3tA:Hartford Insurance Company 22357 - 7100 S.W.99 Avenue Ste 202 ItbBtEta-:. Miami,FL 33173 . INSURER C: INSURER D INSURER E: INSURER F: . COVERAGES • CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE tJSTED BELOW,HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDFRON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE iNSURANCE AFFORDED BY THE POLICIES-DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, OCCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TYPE OF INSURANCEALM SUITE LI POUCY EFF POLICY EXP I LTR GENERAL LLABDJTY IN R YAIG- POLICY NUMBER ,C• MWDDIYYYYI IMM/DD IYYYYI 'LIMITS - EACH A © co"mERCMi GENERAL LIABILITY BA 04104112 ONOM13MAGE TORENTE s t000,000 • PREMI$Es(Ea s 300,000 :■ CLAMS-MADE X OCCUR ASA EYP(AYw n pens) 3 10,000 ■ PERSONAL 3ADV INNRY $ 1,000,000 PROFESSUNALtIAB act GENERAL AGGREGATE 3 2,000,000 GENE AGGREG AT �E Low APPLIES PER PRODUCTS-COMPIOP AGG S 2,000,000 • POLICY I I /L IA n LOC S • - AUTOMOBILE LIAaLm' -. _ COMBINED SINGLE LIMIT .. -3 ANY AUTO ... _ _. (Ee ecodSl) ALL OWNED AUTOS ODDLY INJURY(Per person) I BODLY WJURY.IPeFe ddrnl S .... I SCHEDULED AUTOS - PROPERTY DAMAGE 3 . HIR®AUTOS (Pm acorn NON-OWNED AUTOS S I 3 UMBRELLA LAB I OCCUR ■ EACH OCCURRENCE S MESS LIAe I CLAIMS-MADE AGGREGATE _ 3 — ■ DEDUCTIBLE s — RETENTION S - - $ 1WORMERS COMPENSATION X WC STATLL Ono AND EMPLOYERS'LUIBILDY TORY LMRS ER A ANY PROPRN ETORNARERIEXECVLNE YIN 84WEGPU599D 04/04112 04/04/13 EL EACH ACCIDENT - 3 100,000 OFFICER"EMBER EXCLUDED, NIA IMmSe'my In NH) EL DISEASE-EA EMPLOYEE 3 100,000 I50I 0,000 RIWetx OF OESCRIPate OF OPEAATIONS pilawEL DLIFASE-POLICY LIMIT3 500,000 • DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (Atbcn ACORD iDt,AYNtlwul Rawr4 BLACNe,II ran space Is npWnq) 1 FOR INFORMATIONAL PURPOSES I CERTIFICATE HOLDER CANCELLATION VITAL SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL :BE DELIVERED IN Vital Engineering,Inc. ACCORDANCE WITH THE POUCY PROVISIONS. - II7100 S.W.99 Avenue Ste 202 AUTHORIZED REPRESENTATIVE Miami,FL 33173 I - ®1988.2009 ACORD CORPORATION. All rights reserved. ACORD 25(2009/09) The ACORD name and logo are registered marks of ACORD . J Bonfill 8 Associates RFC)d12-04-02 Page95 Iiiill CERTIFICATE OF INSURANCE I SUCH INSURANCE AS RESPECTS THE.INTEREST OF THE CERTIFICATE HOLDER NAMED BELOW WILL NOT BE CANCELED OR OTHERWISE TERMINATED WITHOUT GIVING 10 DAYS-PRIOR WRITTEN NOTICE TO THE CERTIFICATE HOLDER, BUT IN NO EVENT SHALL THIS CERTIFICATE BE VALID MORE THAN 30 DAYS FROM THE DATE WRITTEN. THIS CERTIFICATE OF INSURANCE DOES NOT CHANGE THE COVERAGE PROVIDED BY I ANY POLICY DESCRIBED BELOW. This certifies that ® STATE FARM MUTUAL AUTOMOBILE INSURANCE COMPANY of Bloomington, Illinois 0 STATE FARM FIRE AND CASUALTY COMPANY of Bloomington, Illinois 0 STATE FARM COUNTY MUTUAL INSURANCE COMPANY OF TEXAS of Dallas,Texas I ❑ STATE FARM INDEMNITY COMPANY of Bloomington, Illinois, or ❑ STATE FARM GUARANTY INSURANCE COMPANY of Bloomington, Illinois has coverage in forte for the following Named Insured as shown below: I NAMED INSURED: VITAL ENGINEERING INC ADDRESS OF NAMED INSUREO: 7100 SW 99TH AVE STE 202 HIAHI, FL 33:73 POLICY NUMBER 620 1250-F.16-59N 632 1309-D11-59E I EFFECTIVE DATE OF POLICY 11/16/11-06/12/12 10/_1/1_-_0/11/12 DESCRIPTION39 LE%US ES 350 OF ENOL 1 VEHICLE(Includig VIN) JIBBJ46G:92299:44 LIABILITY COVERAGE ®YES ❑NO ®YES ❑ NO ❑YES ❑ NO ❑YES ❑NO LIMPTS OF UABILITY I a.Bodily Injury 300,00C 300,300 • , Each Person Each Accident 350,000 - 1300,000 I b.Property Damage Each Accident 500,000 I 500,000 • c.Bodily Injury& _ Property Damage' I Single Limit Each Accident PHYSICAL DAMAGE COVERAGES ® YES ❑ NO ❑YES ®NO ❑YES ❑ NO ❑YES ❑ NO I a.Comprehensive $25C.00 Deductible $ Deductible $. __ Deductible $ .. Deductible ® YES 0 N ❑YES ®NO ❑YES 0 N ❑YES 0 N b.Collision $250.CO Deducible S Deductible $ Deductible $ Deductible EMPLOYERS ❑ YES ® NO ®YES ❑NO ❑YES ❑ NO ❑YES ❑NOCAIm COVERAGEHIRED CAR LIABILm ❑YES ® NO ®YES ❑NO ❑YES ❑ NO ❑YES ❑ NO FLEET-COVERAGE FOR MOTOR VEHICLES am- (//DES ® NO ❑YES ®NO ❑YES ❑NO ❑YES ❑NO 1?-a -)-7-1) �J ttai may' CSR 2360 . 04/25/2012 1 Signature of Authorized Representative Title Agent's Code Norther Dale Name and Address of Certificate Holder Name and Address of Agent INSURED: I VITAL ENGINEERING INC GwPan figlnd Apw 7100 SW 99TH AVE STE 202 MIAMI, FL 33173 1.1155LYHLy Sren Lop me raaI R UM= lanE Xli _. pudsSMiAlingibmlrk•r INTERNAL STATE FARM USE ONLY: El Request permanent Certificate of Insurance for liability coverage. 122425.3 Rev.o7-26-2c06 til Request Certificate Holder to be added a5 an Additional Insured. I • I I J Bonfill&Associates '� RFQ 612-0402 Page 96 UA�o® CERTIFICATE OF LIABILITY INSURANCE ATE15/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER:THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED fl REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER IMPORTANT: If the certificate holder Is an ADDITIONAL INSURED,the pollcy(les)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the • certificate holder in lieu of such endorsementts). _ PRODUCERCONTACT Mercedes Mark NAME: Insurance Source.com, Inc WC No.FAII: 813-902-8191 I ASC N p 813-902-7007 P.O. Box 270119 no""D Ess: mercedes@shopinsuranceonline.com •Tampa, FL 33688-0119 INSURER(S)AFFORDING COVERAGE 1 NAICN OINSURER A: American States Insurance Company INSURED Nifah and Partners ConsultingEngineers, Inc. INSURER B: Lloyds of London —- 'wsuRER C: I — 8785 SW 165 Avenue Suite 108 INSURERD: I Miami, Florida 33193 INSURER E: I INSURER F: I COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD e INDICATED. NOTWITHSTANDING ANY REQUIREMENT.TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN.THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR ADM SUM POLCYEFF POLICYExP TYPE OF INSR WVO POLICY NUMBER I(MJATNJITYYY1 I R,woon YYm LLYITS ill GENERAL LIAB1m- EACH OCCURRENCE I$ 1,000,000 X I COMMERCIAL GENERAL L'AEILRY DAMAGE TO RENTED _ PREMISES(Fa ccTEMcel $ 2,000,000 CLAIMS-MADE I X I rrn IR MED EXP LAM ore semen) I S 10,000 A 1 _ X 25-CC-202194-40 02/13/201202/13/2013 PERswrALaAwuuuRr $ 1,000,000 GENERAL AGGREGATE s 2,000,000 II GEN',AGGREGATE LOUAP'P�LIEIS PER: PRODUCTS-COMP/CPAGG $ 2,000,000 X I PODGY FR; I I LOC S AUTOMOBILE LIABILITY CEOMBINEEDDSINGLE LIMIT S 1,00.0,000 -- -- -ANY AUTO BODILY EI2URY(Per;era) $ A ASO MED I AUTOSJLEDO X 01-`l-312476-20 02/13/2012 02/13/2013 60DLY INJURY(Pe:=dart) S NONX I FIRED AUTOS I_,AUTO SCJ D I(Per (P r eceeenti :0.G/ $ - $ II XI UMBRELLA UA6X ,D IEALH OCCVRREI:CE �s 4,000,000 A I EXCESS LIAR I ICLALMS-MADE X 01-SU-402353-03 92/13/201202/13/2013 AGGREGATE IS i I ,UEu .Nei&MONS .3 — WORKERS COMPENSATOR V.0 STATU- tom-I AST EMPLOYERS'LIABILITY YIN TORYIIMITS ER ANY PROPRIETORIPMTNER/EXEC'JTNE EL EACH ACCIDENT If OFFX:ERMEMBER EXCLUDED? NIA - - - -- (Maodatonr hi NH) E.L.=EASE-EA EMPLOYEE S (yes.desMW esker - DESCRIPTION OF OPERATIONS Beira EL 05EASE-POLICY LIMIT 13 B Professional Liability PGIARK00383-0004/30/201 04/30/2011 1,000,000 DESCRIPTION OF OPERATORS I LOCATIONS/VEHICLES(Attach AGGRO 131,Addelonal Remarks Schedule,If more space Is required) D MDAD Airside Operations & Risk Management Division has been named as additional insured. D CERTIFICATE HOLDER CANCELLATION D MDAD Airside O erations & Risk SHOULD"ANI-OFTHEABOVEDESCRIBEDPODCIE59ECANCELCED'BEFORE"'" -- PTHE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Management Division ACCORDANCE WITH THE POLICY PROVISIONS. a P.O. Box 592075 Miami, Florida 33159 AUTXCRI)ID R£PRFStNiATVE Jeffrey Kaplan lic# A136770 I 01988-2O1OACORD_CORP_ORATION.110.rdghts A ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD e • 01 J Bonfill 8 Associates RFQ#12-04-02 Page 97 J . BONFILL 8 ASSOCIATES Architects Land Surveyors & Mappers 1 ill Approach and Methodology IArchitecture: Our Firm is experienced in Continuing Services Professional Contracts. Under a three year term Miscellaneous Architectural and Engineering Services contract for the Miami-Dade Fire Rescue IDepartment our firm participated on many major and minor projects for the Department. We have detailed our experience in such relevant projects in Section F, SF 330. We also provide services to Miami-Dade County under the Equitable Distribution Projects (EDP) program. In addition to I Municipal Projects we included private sector experience that is relevant to the Design of Parking Garages and Community Centers. Other relevant projects are detailed in this submittal. I Understanding of the City of Sunny Isles Beach's needs, goals and objectives as they relate to the project: J. Bonfill & Associates (JBA) will enter into a continuing contract for professional services for I Continuing Professional Architectural & Engineering Services on an as-needed basis for multiple projects. The services will include, but not be limited to: 1 Planning and Programming Construction Services Site Analysis Construction Sequencing Facility Programming and Planning Construction Documents Zoning Analysis and Applications Construction Administration I Public HearingNariance Presentations Contract Bidding and Negotiations Inspections Pre-Design Services As-Built 0 Project Programming Close-out Documents Design Criteria Studies Existing Conditions Surveys Additional Services I Quality Assurance Architectural Design Specifications Site Planning and Design Cost Estimating Architectural Analysis/Reports Construction Documents I Architectural Concept Program Management Renderings ADA/Accessibility Assessment & Design Schematic Design Permitting I Design Development Final Design Life Safety Code Evaluations Change of use applications Cost Control Evaluation Certifications IInterior Planning and Design Computer Services Programming and Space Planning Computer-aided Design Furnishings, Fixtures and Equipment Computer-aided Drafting IInterior Renovation Engineering Design/Plotting I I 7100 Sw 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com J Bonfill&Associates RFQ#12-04-02 Page 98 . J . B O N F I L L & ASSOCIATE S Architects Land Surveyors & Mappers • Approach and Methodology Proposed project methodology: Overall approach to accomplishing the project. Project Initiation: Our approach to respond to a request for work order or fee proposal will follow these procedural • steps: • Establish Point of contact for each project and provide JBA's assigned representative • Have preliminary meeting, if warranted, to define the Scope of Services and to resolve any questions. • Visit the proposed site, gather all pertinent information necessary for preparing the Proposal • or Request for Work Order of Notice to Proceed. Define and/or confirm the scope of work. • Investigate and become familiar of the project scope and limitations 1 • Obtain input from Professional Consultants • • Generate fee proposal including timeline for completion, staffing and deliverables. Fee proposals will comply with all the requirements established in the contract. ' Project Planning: Approach and Method: Approach, management and methods utilized to plan, conduct, and administer project, inclusive of procedures to assure timely performance of the work. I ' JBA will approach each City of Sunny Isles Beach project with the same professionalism that we serve all County and City agencies and private sector clients whether it is for a proposed multi- million dollar facility or a minor modification. We remain involved from the beginning of a project to its final completion, from the feasibility study of a site, through site design and construction, to the final as-built and close out. Our firm is experienced at conducting Architectural and Engineering Services in dynamic large sites where there is constant ongoing activity. Our staff is experienced in coordinating our work with the City's Project Managers and with the Professional Consultants, General Contractors, and Specialty Contractors as well as with all City, County and State Agencies having jurisdiction over the project (Building, Zoning, Planning, WASD, Public Works, Fire Department, DERM, etc.) Preliminary review and coordination of consultants work. Our staff enjoys the challenges encountered in conducting demanding work. We pay attention to details before the work commences. We like to coordinate with the occupants or users and receive their input. We devote ample office time to the project during the planning stage prior to any design submittals. a ' 7100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com a J Bonrill 8 Associates RFQ#12-04-02 Page 99 J . B O N F I L L & ASSOCIATE S Architects La n d Surveyors & Mappers Approach and Methodology Project Execution: Approach, management and methods utilized to plan, conduct, and administer project: • Research existing documents • Schedule and coordinate all phases of the work • Collect and/or Prepare all necessary documents • Report the status of the work in process • Provide pertinent data, records and sketches • Provide preliminary or first draft drawings or calculations if required in proposal • Submit for review computations, sketches, and data representative of the work's progress at the percentage stages of completion stipulated in the Notice to Proceed • Submit the finalwork product • Incorporate any modifications requested • Submit all deliverable items • Provide general consultation and advice throughout the project and term of the agreement. • Mend meetings if revisions are required or requested • Implement or incorporate revisions as required • Produce final documents and deliverables in Hard Copy and/or Digital format ' Construction Management: • Construction supervision for adherence to contract documents, plans and specifications. t • Provide and maintain a construction schedule using software supported by the City. • Provide periodic reports of findings in writing • Ensure that the contractor has proper insurances. • Assist in the management of submittals, shop drawings and requests for information. • Provide consultation services for the management of change orders including pricing. • Use project management tools and software to assist in managing the overall budget of the project. • Assist with and/or conduct inspections. • Inspect and review the project to monitor compliance with the Building Code, City Ordinances, safety codes and other applicable regulations • Interpret and explain plans and contract terms to administrative staff, workers and clients, representing the owner or developer. • Assist in obtaining all necessary permits and licenses ' • Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, conplaints and construction problems. • Investigate damage, accidents or delays at construction sites, to ensure that proper procdures are being carried out. 7100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com 1 I J Bonfill 8 Associates RFQ e12-04-02 Page 100 I11 J . BONFILL 8 ASSOCIATES A r c hit e c i s Land Surveyors & Mappers Approach and Methodology 1 1 Surveying: Understanding of the City of Sunny Isles Beach's needs, goals and objectives. J. Bonfill & Associates (JBA) will provide professional services for Surveying, Topographical, and Mapping IServices on an as-needed basis for multiple projects. The services will include: • Boundary Survey Underground Utility Location • As-Built or Record Drawings Drainage Surveys Legal Descriptions & Sketche • s • Construction Layouts Preparation of Plats and Maps Topographic Surveys • Plat & Street Committee meetings • Calculations Vertical Project Network Control Control • Right of Way Surveys Water Boundary Survey • Alignment and Right of Way Lines • ALTA/ACSM Surveys IScheduling methodology-time line for effectively executing the work in the optimum time. J. Bonfill and Associates maintains a very flexible field survey crew structure. We do this by I extensive cross training of personnel, careful hiring techniques, and having a unified planning and scheduling department. For technical positions.such as Party Chiefs or Instrument personnel, we maintain multiple trained individuals in our crews. JBA can rapidly increase the number of crews available by utilizing these cross trained individuals and selected office personnel to form additional Icrews. ▪ We employ three Registered Land Surveyors. • We employ four survey crews. • Our technical staff is made up of graduate Architects and graduate Engineers. Our Proposed Project Managers have been working together since 1992. • Three owners will be actively involved in this contract. I • All City projects will be monitored by 3 people to ensure rapid response to all requests. Approach to preparing the different type of Surveying Services: o Boundary Survey: The monumentation and re-monumentation of property boundaries and subdivisions as stated in a Work Order. Survey and/or stake as needed all existing recorded subdivision/condominium I boundaries, tracts, units, phases, blocks, street RNV lines, and common areas. Including analysis and processing of all field collected data and/or reports. If unrecorded subdivision is on file in the public records of the subject county, tie existing monumentation of the beginning and end of unrecorded subdivision. I As-Built or Record Drawings: The measurement and preparation of plans showing existing improvements after construction and I the layout of proposed improvements. Locate all above ground features and improvements. Deliver in data in electronic format including field edits, analysis and processing of all field collected data, existing maps, a hard copy of the field book, and/or report. I I 7100 SW 99th Avenue • Suite 104 • Miami. Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com I • J Bonfill 8 Associates RFQ#12-04-02 Page 101 J . BONFILL & ASSOCIATES Architects Land Surveyors & Mappers NIL I Approach and Methodology Legal Description: The preparation of descriptions of use in legal instruments of conveyance of real property and property rights. 1 Plats and Maps: Preparation of Plats and Maps: The preparation of subdivision planning maps and record plats, in accordance with state law and local regulation for specified areas and/or properties. Preparation of tentative and final plats or the review of plats prior to approval and/or recordation as directed by the Project Manager. Meetings and Compliance with Applicable Codes: JBA will attend Plat and Street Committee meetings in behalf of the City of Sunny Isles Beach. JBA will review and ensure that final plats are in compliance with all applicable law, including City of Sunny Isles Beach, Miami-Dade County and Chapter 177 of the Florida Statutes. When JBA determines that a final plat is in compliance with said codes and statute JBA will: Sign and date the plat after the following statement: 1 have reviewed this plat for conformity to Chapter 177, Florida Statutes, as amended". Present the plat to the Project Manager for Signature by the City. Submit the plat to the City for further processing. JBA will also submit copies of all documents, correspondence, notes and calculations, etc. relating to the plat review. Vertical Project Network Control: The determination of, but not the design of, grades and elevations of roads and land in connection with public right of way, City owned properties and subdivisions or divisions of land; Establish or recover VPNC for the purpose of establishing vertical control on datum approved by the City; may include primary or secondary vertical control points. Includes analysis and processing of all field collected data, and preparation of forms. Alignment and Right of Way Lines: The creation of perpetuation of alignments, related maps, record plats, field note records, reports, property descriptions, and plans and drawings that represents them. Establish, recover or re-establish project alignment. Also includes analysis and processing of all field all collected data, existing maps, and/or reports for identifying mainline, ramp, offset, or secondary alignments. Depict alignment and/or existing RAN lines (in required format) per City R/W, platted or dedicated rights of way. Topographic Surveys: Consultant shall perform topographical surveys including cross sections and related information necessary to accomplish the design and construction phases of the project. Locate all above ground features and improvements. Deliver in electronic format acceptable to the City. Effort includes field edits, analysis and processing of all field collected data, existing maps, and/or reports. Perform field survey check sections or profiles to determine existing cross slope. Construction Layout: JBA will perform all layouts for construction and provide final measurements and quantity sheets. If requested in water and sewer projects' Work Order, JBA will be available on a full time basis during underground construction. a a ' 7100 SW 991^ Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com i I J Boffin 8 Associates RFQ#12-04-02 Page 102 I BONFILL & ASSOCIATES A r c h i t e c i s Land Surveyors & Mappers I A.4s -IL Pi Approach and Methodology I Drainage Survey: Locate underground (XYZ, pipe size, type, condition, flow line) that relate to above ground data. Field edits, analysis and processing of all field collected data, maps, reports. I Underground Utilities: Designation includes 2-dimensional collection of existing utilities and selected 3-dimensional verification as needed for designation. Location includes non-destructive excavation to determine size, type and location of existing utility, as necessary for final 3- - dimensional verification. Survey includes collection of data on points as needed for designates and Ilocates. Includes analysis and processing of all field collected data, delivery of all electronic files. Water Boundary Survey: Perform Mean High Water, Ordinary High Water and State Upland Line ISurveys as required by City Standards. Photogrammetric: Photogrammetric control, including the determination of photo identifiable control points and marking contact prints. - I Submittals and Deliverables: JBA will submit to the City signed and sealed maps of all surveys performed as required by the scope of work, as well as all field books data if required. IProgress Reports: Submit regular reports of the work at intervals appropriate to the Project. I Field Notes: JBA will Submit to the Project Manager one original set of all field survey notes and any other data developed for the purpose of performing the required surveying Work required for the Project. Field Notes will be presented in a field book acceptable to the City. When using data collectors, a report and digital submission will be provided along with all the necessary field survey Iinformation. The report will be furnished in a field data archive form acceptable to the City. Drawings: JBA will perform CADD drafting services required to supplement the field work. Plan I and profile, cross-section sheets shall be in printed and digital form. JBA will submit to the City electronic files all of the information gathered to produce said maps of the survey including but not limited to Electronic files for: • Existing topography ▪ Existing utilities • Existing drainage features • Existing elevation points • Reference points • Horizontal Project Network Control • GPS Project Network Contro l• Vertical Project Network Control I • Existing right of way and monument lines Topography: I • Locate and identify all above ground structures from RPM to R/W, including but not limited to buildings, overhangs, columns, planters, pavement, driveways including type, sidewalks, walkways, concrete/asphalt slabs, mailboxes, fences, bus stop shelters and signs, trees I including trunk diameter, shrubs, landscaped areas, street signs, fire hydrants. Identify all surfaces such as sod or the type of pavement. I I I 7100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com ..1 fronfilltAn?cla.terissit;i7,.... • „-E, ::-, diii';°4:22-:-.f.,:.:c:;::::-;,,;:,,H;,...1 :,•,-... ......,..,, .,:,'.', ,:;,-!':'-::• •:',; 7'..,.-.,- .. . - :;-:-: ..:3;.:_,:_.-•'..C:-.-..:-.'::::;::-. -:':.'E'-.11 - • - ::::::-.:,:„: . . .. .::?::-.‘,;:•;:f,i1; ;; :::;;;:::-:-T-..• ?,-;:,1:::-1::::::',:,-C.,::::: ::::::/,.::::::':;,:: ,;:!;?,::1 I --:;•=11:2.:::::-.1::::.:::: :::::;•1-1:-,:„;:;:::::.;.....-,ItY:,;:::''2.,..*.---ti-;.- :"-.:!:):,-.--.: I '.. *:',1:7 ---:5:1..-..:: -.":::::;:.-1±::::::::::S..:::.;;;;:::?-:::::.::::.:Z''.... i*:.: :'.`.:Ef..d;-",;77-":-.....:!::-.t.,:.i .:::::;:::: ::--.:..:;:,:: 1--ff.:J.:•ir'1,1\; :•.':1;L- %..:::,...:.5',.. .t.z.r.'-:.:1:z;,.;::......`,..'-f.'.:1; ''':::!..--;,...-,t7::i;::::::':::?::';:1::,:7-:.;2;".-:-.1t.i7::;:;z:::;:•J-?:::::;:-::::: '''''.:':::::::" ,121.:.::7.;:-...f,7i '? :::‘:...;':::.[: ::::•:;:'1'''.-1;:''.,'1:i.:::::. .ct..";:1-;',:',..f.E.-Ii--21-;;i-;.:•-:,..'-', :f.i:;::...":::: :::::::-.*.'.;', ."..'...1;; ::-, ,, .',,-.:frya,..:: .:...f-.4.7.!;1.*:- ; ':-'•-:::::;,..-.I:.:-.P... ,.-.1:..7.....,271:.. -1..:.-.,........:,. .:::::,:if.::.::::4:',,',C;121;.:::;'.1:: :::::::';:l .:-.;;;;12:2:::.:::-.;;;iii:;:-:1:1:;::::::;,.. 5:::,?::',...).:::: :".:'11::: :::'!::::::: ::::::.:::1:1;::1:::-::-.-ci;31.7: I '::::2.?:;':?;..::;::;:_;::::::::::: C-,:::?1:':i'; 1‘...:: : ::::-..1.;'..•:.;:?-::::':?:::]::,:i.:T:;!tir::::.: ::::..;71:3,:iTJ:::::::::';:::::::51:::7:. ii, ..;.:1;t;i . ::- .-.;-:-`-....,:;:,;i.:.;,,,----:',.:.,.:•:- ,:-.-,!:---:-.•1,7,::.--i:':::::;:-.:.-E,',;-::/:.-E,, >: . , ..-•::::-:'.1- j::".:,,.,2:c.'Fici;!.:!;:lit:-.1, •:;.::::....,...,..,; :.-. .1:',-..::-.,::,,1::.]:.:11-.c.k•.i,::.:':::;.'*:,..-i?;',;:c ,::)..:-: :-, I . . . ....:;:::::::;:: ':*...---;',;-;(*2::::1-"J./.t:'. ':::;;.:':!''.-1 1 -,• -:ii- ::',7.--?:.:J::::-2/J.:: :.',.'F'.--.. ; ..,',;.-::::?::7-::',...,-.,';',..: .,:-.:-:z.-;1,?..--P,...: 1 :..7.-,..,.'.f,''''''::::->::1 t.7,::::-.....:I.si•;t; .- :-..1...:t. ',i3t.:}.;i:: :::j.-....:"..::::',.±::::::-C.-: :-.771 ;;:'f:•:'-.:":"Ill I ":::'.f‘:..'4:1:!...,:.;:::-...: ''.;:.it.ir :4-2:1:ft : . .:".• 2'.:::?:::;::::7;: ::: 1:1;;;::::t.;.11::;-::::.''l...'1.:::;71.f1:;:;;...;:;14:!::::;::::::.:. .[::1-1-:;IT:i:::.-1':1 ; ',-•.'" -C-:. .`-r--''',Z- 1111-;.;' --.. 1'- ':- 7 c t. Th:„?-:':"..--;'.''' 7. -* ';:l :•';tv:''' , ,. ., ... . .„ .. , 1:- ..4"?t ... 5, ,..._:-.,;....!:;.;...:;i: ::::::.:'.:::-...1-:[..:1.1_.---....T.....):1:._:-.,1.....:':::t.ii.-y:1-1:3±::::2 - :''.":.::- . .., ! :: tt.:i':f *-L:i;'f..;. ::..-:-Iiip.-ii..,...„1+ :;:.....; ',.. .: :-..%...::-..., :: t..:,::1;''=.1:;::..1:.'!.;-L1::.:.:*:1';,:::•-t1:::::: .' -.'t.:::'_:c<ciii.:I.:::4;\974;:fic: ,_ '::':::; :::-'51.;;:h.1::::..:.-1:::::i:::::::::::',.2:{::::::,;.1::Tsi...!:::-y..?:::7:7::::::1, :.::-:-::'J .2::::;:-. . I 1-1%::1,; :,".:1::::;:i.Pckl(...:::::1±1-'''':I.:::-:c;1.::127-*7 Al-C-'tic'•i!...;.: -.:. f?...-; 1;9-Irte:1,:fk;f1,..:ifit:t-:4ric'H C.:::-.1 • 7.:::::::':::.:2;; ;:r.%::-..::".:':?7:.:11:::;.)::i. :)::.?).1.1.1.;::';i7.;;I::;:::::1::::.1 I ;:::::'::::::::::-•-• '!-.1'.;::_.:-::-..1.:.:- t:11:::.-1...,:-:::::.:?--.."::;!',-5':.: -::::7.: ...-:...-;-..C.A :c. .stry. r.-...4:.5;w., :-.::::::::::•.:::„-:::.: .:::,-,.: : :-..-.,:..,7.-..:,:_:::i.....:.:,. ..-..-. 7::::- . ..: . . Jr‘.. :,-,,,:.;..-:,t,;::-.-..:'..:-:::.......:::•..-:.:.5.7-..--,1-...::::-.. .-2,--..-.../,,,-4:."-.). - -:€.t.. ...,:”:.,a-_-.•4. -V,i tv y .--fi,:-_:- -,?:,,,-J.:;-,=::-.:./.: -g,7:2,:;!:.::, -•-..,-.,,-•:, -,,,-.1 I --::-;- ''.---•-:,::1.:it-':,---*,-----h-2::<::;::-,,i- . ..... zry,::: ::::•±::.---i.- ,;:-.--,,,::fi;.--:::::1-;: :;.:::,•:-..;:;:.:-..-_,„,1 k i.:ii.:? :.i..t.t.;m1.;::::::„....::...y...:::.,,..:_..... ::_....„:::::;.±tf..;:::,,,.......: ,....,t7..7::,. •_;:47.:.;..:Azit.:..ta...r . ...r„ i.,:.±..c...t.::::..,i.:::::,....7.;.:;:.:::::,y.,.._..,..:::..L..?..:::::!,::::,_;.::::::....:,,,:::i ;;............y.:.:..:.:::::::..,...T........ ...t.....i......:...; ,..;::-...:..::::,...:1?..?.... : ::;:......„.:.;::.....„,i:;.,:k.t.....„..„.. ,._..2:7........i.,.,;:i.::::: ,:: ,..,....y.t.::..;:ti.r...; : :: .::,:5...........,: .:,....,....:,................/,.:. i :,:.::::::..i.[:: .2:: ::. .-....i., , : , .. : - ;...•if.t.::::::::4.::::: :m:7*:.*::::::::.;-......::::.*5.i.;,:......:ts.: . .),1f-::,_:,: ..(i.::i:E:?z:::_: : , cft.;:...:-/;,...y;"::::.:;..-.:.c.:::.-ii.;;;;_:::,:f:_i_y..cri • tf,.... . . :: :..:::;.:::y::•:::;:"::::::::::...i.,:z. ;,:.-,i,-.1.;:-:...c:.:::,,ii::::,,i.T. .,......1,„;,.::: , -:. ,::::.,,,,.:72,-;i4,,tct-Lir;.,..7.:. f: ri:;:::: ;,._.-;:.:..ti:),::;.;.::::::.,.:7....,-,:ic..:::;.i.,,:::::::::.:tit.-:::::-v::;.;::::cit.i.4.:::..:(1 1 :::::::::.:.... t.. .... ...,...:;,., :..„.tt. .....:.:....7..;,.,,,:.......:::...J."..... .,:.„.,..,...7yit, ..;„:: i..::::3„...:.,;......a..f.:i..... ..:;tt.t. ....,4z.:1,...).. .. .,. .....;::1;:...,,::::.:„:4,.:::..;:_,::..,f.:::; ;....::,,,::...1..,.::......,:::..;.:.::::1 MJ ' L . . .......C:::.:.1::-:;::i?:,,:::7::::i1-:: ... .fr:•-. ;i:.:....:::,:1-...-----....•.',":.:- ,:::.:::::::;""E:;ti11:; :.-;:i±1.: --,:t'::.;::::.:i;::...-1.:.;.:: I I ::.11.:t ;1:: ;:::f1::::TC.:.-5::::;-.c:1::.!::: :::::11::::::. 11: H', 01:...a:::-..;: .::::75--.:(:;:?:;.,;:::: . -"2-----.11-1ICY I 1::::11;:: :-::i i.c:.;1:-1.:::::::71::J::::::::::...::::1::711:;,;:;.:::;?:.:::.):.; :: :::1::1::::f ,: :::: ::-: ' :i:.;: I.:r-\::;:;':.:.:,, ::-...i.--fi;;::-.1;-Y[-" ..;;;11.1:;:rt./:;:::::ti:E:.1 IN) . . . .::':: ::.c;...f:::::-.!'-,:,!..:,.."..'.:•;;:.:-.---.1: A::-.1, H ;:-,2-.,-::•:7-.,,,;,......,_.-,::::::_y:5-tskyt::::::::::.'.:,_::;-...s.::,::::::: ', ,r,.:,,-vic,/,:[:'7:,:;',.:.;:.=;i; .:-.,...'tz.c.'},.::..::.:::.,_:..,:i, -.-j:Ir,:.:i.•,,,....:',,!:',,itift:ir:;.-:::.-;',:i;:,!; '.:: ::',:_:..2:?;:i.,..:,' ,?,,,;c:tf-'4.3.--,..--' --.-, ..., • ,:.. '.-..:-,- -.,:,,,',,,,-..7%.:„.,.".,::::::::-/-...?,.-2-.."-:.,'.g,:if:,. ,-P. z;':: E.?.,-' .-.7: :::.,::::"::•-•.--,.Y..:::"-::;,::::;if.).: 2:,:.::!.ri:::!:',:.i.:: ..:'‘-2-::::,--.•:-).:ii:-::.;',J-r:::::-.::,...-::::-:'1,t.-:',-,:-.7,-.-‘-. ....-. 3:',..': y..,..',,-;-.'.:::::"! 1 ?::: -,;-::::1:s1::-.,;:-'[..,:if:.1.:1:-:„.:".:1 ,....;.1.-,y..--c,::::: ::..;.,':::::/.111.,::.....1.;"-.-;--:::::,:::::-..f..-7,-....y.,::.*:---'7 !.-.....-,,J,:-::1:5--:-:::-,:::.,:-....;:::::::-.•.-:,4„,--...-..]::...,hy-c...*.i:,..-,,-. T.:,::::.,.. I :::::::;-:' ,?,,',.;:,'In,. .,r.„:::::::-.':-.1";:-::...:',.:7-.1.::::::::::::.:-...:::.:::::::.;;:.:1:cli'..:;,s,E:'.:•:::•::.k,,':;:lYc...J::.::1;::.!?.-!-:.-...; 5.1;i....;:.;....' :: ::::::,_?:.'L'•',.;:-......iii.:::,': .;:.±--,...,::•-1;::7:,-.-:.;,:::.,tit.-:' ..:' ,:lzfi ,.-'.1:2?:'[...:.: ,.',..I eiiiNG; . ,. CONSULTING,. I I J Bonfill&Associates RFQ#12-04-02 Page 93 �, O Ami o - CERTIFICATE OF LIABILITY INSURANCE DATE I 011 TMS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. I . IMPORTANT: If the certificate holder b an ADDIITONAL INSURED,the policy(ies)must be endorsed. N SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(s). PRODUCER CONTACT NAME: I Ames & Gough /PRONE A aro. (703)827-2277 I iaw.(7W)027-2279 8300 Greensboro Drive Ea ADDRESS' Suite 980 INSURERS)AFFORDING COVERAGE NAM a McLean, VA 22102 INSURER A:Beaz ley Insurance Company, Inc. 37540 INSURER B: Vital Engineering, Inc. INSURER C: • 7100 SW 99 Avenue INSURER D: Suite 202 INSURER E: Miami FL 33175 F, COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE USTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO.WHICH THIS I CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES'DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ADM SW UR TYPE OF DISURINCE WRIT wen POLITY NUMBER (NMA7M'rY1'1 IMMrWIYj'YYI LIMITS GENERAL LNBLr1Y I DLU 10CCUtiRENCE i COMMERCIAL GENERAL LIABILITY OLMM(+10 RENTtO PREMISES(Eaornral f QAwS-MADE OCCUR mnMED EXP Wry a•pefa) f PERSONAL I ACV UMW I I�I GENERAL AGGREGATE I GEM-AGGREGATE t 7 PCLA:Y1-1 JFC7 I ILOC PRODUCTS-CCMPgP AGG 1 . jr-Rei AUTOMOS1LE LIABILITY CONEMEO SINGLE UNIT (FAacbn) S AMY AUTO BODILY INJURY(Per penal S 1 . —ALL OWNED SCHEDULED AUTOS AUTOS BODILY INRIRY(Pe accident) t wRED AUT. OS Hou-OWNED PROPERTY DAMAGE AN09 (Per arGeet) S S UMBRELLA UAB (V7m m EACH OCCURRENCE S EXCESS UAB CUIMS-MAD€ AGGREGATE $ DED I IRETENTIONf S WORKERS COMPENSATION WC STATU- GTI— • AND EMPLOYERS UABafTY VIN TORY UNITSI IFR I ANY PROPRIERCR/PARTNEP/OECI.TVE CFFFCER IDASER EJO.IuoeD7 NIA E L EACH ACCIDENT I IRyynwwnb. Mr In NH) E.L DISEASE-EA EMPLOYEE f - DESCRIPTOR OF OPERATIONS below EL DLRFACF-POLICY ULOT I A EItOFESSIONAT. LIABILITY VlSIISM110401 10/11/2D111O/11/2012 PERCIAM 1,000,000 IIAGGREGATE 1,000,000 DESORPTION OF OPERATIONS I LOCATIONS/VEWCLES(Mad ACORD III,Addmeeai Romano SdadeM,If mon space Le required) I • CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE I THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED W EVIDENCE OF COVERAGE ACCORDANCE WITH THE POLICY PROVISIONS. AUTNORDID REPRESENTATIVE IMatt-Cough/BHARRI X ACORD 25(2010/0.5) ®1988-2010 ACORD CORPORATION. All rights reserved. 1 INSO2512olmsl.ol The ACORD name and logo are registered marks of ACORD • I I J Bonfill&Associates RFQ#12-04-02 Page 103 ' J . BONFILL 8 ASSOCIATES A r c h i t e c i s L a n d Surveyors & Mappers r . Approach and Methodology • Locate all utilities and their respective structures within the project limits, including all water I mains, sewer mains, drainage systems, power conduits and overhead lines, telephone conduits and overhead lines, cable TV conduits and overhead lines, gas mains, concrete, poles, catch basins, valves and valve boxes, manholes, cleanouts. The City will provide I • JBA with plan views of all potential utilities along street R/W. Obtain invert elevations for existing storm water and/or existing inlets and catch basins, pipe size, type and condition. Where structures are determined to be inaccessible, JBA shall notify the City in writing. JBA will be notified once the structure has been made accessible. I . Obtain finish floor elevations. ▪ Locate and graphically depict trees over 6" in diameter within the R/W. IRoadway Cross Sections/Profiles: Obtain cross section elevations at 25-ft intervals along proposed R/W, elevations will be taken at: • Centerline of roadway Crown of the road I Edge of pavements • Top of shoulder/swale Bottom of shoulder/swale Bottom of the gutter pan • Top of Curb • Front of sidewalk Back of sidewalk • line • 10-feet outside of R/W line Longitudinal grade breaks • Any other grade breaks • Building face IStructural Engineering: • Provide structural plans and specifications for any given project. I • Provide structural calculations to satisfy the authorities having jurisdiction • Provide consultation services to the Building Department as needed including inspections and plan reviews as directed by the building official I • Provide inspections and associated reports • Use structural engineering modeling software as required by project. I MEP: • Provide mechanical, electrical, and plumbing plans and specifications for any given project. These may include plans for fire alarm, fire sprinkler, generator design, low voltage design, I computer cabling and security. • Provide MEP calculations to satisfy the authorities having jurisdiction including to hydraulic calculations, energy and load calculations and electrical calculations. I . Provide consultation services for LEED implementation and energy efficiency strategies. • Provide consultation services to the Building Department as needed including inspections and plan reviews as directed by the building official. I • Provide inspections and associated reports. • Use MEP software such as Energy Gauge, Trane Trace, or Revit. 1 1 7100 SW 99,^ Avenue • Suite- - ' 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com 1 1 J Bonfill&Associates RFQ#12-04-02 Page 104 1 J . BONFILL & ASSOCIATES A r c h i t e c i s Land Surveyors & Mapper ) NIL Legal Claims May 1st, 2012 City of Sunny Isles 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Re: Continuing Professional Architectural & Engineering Services-Firms Only RFQ 12-04-02 1 Dear Selection Committee Member, J. Bonfill & Associates, Inc. has not had any legal claims alleging errors and/or omissions, or any breach of professional ethics, including those settled out of court, during the past five years. Sincerely, LAG (g-wim tc. acqu line Bonfill Gee Registered Architect President J. Bonfill & Associates •1 1 1 1 7100 SW 99th Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • LB3398 • www.jbonfill.com •1 ' J Bonfill&Associates RFQ 912-04-02 Page 105 I\ Architects J . BONFILL & ASSOCIATES Land Surveyors & Mappers 1y'NIL p ' Client References 1 Paulo Costa,Construction Projects Coordinator Florida International University-Facilities Management/Facilities Development Department CSC#245 University Park Campus Miami, Fl 33199 1 Tel: (305)348-4009 Email: Paulo.Costaefiu.edu Project: Florida International University 2 ' Duane J. Kopp, PE Senior Professional Engineer Miami Dade County Public Works and Waste Management Department 111 NW 1s'Street Suite 1610 Miami, Fl 33128 Tel: (305)375-2960 Fax: 305-375-3070 Project: Shelter for Domestic Abuse Victims 3 Alfonso J. Ledo Construction Manager- Facilities Construction Division 1 Miami-Dade County Fire Rescue Department 9300 NW 41'Street Doral, FL 33178-2414 Tel: 786-331-4509 Fax: 786-331-4501 E-mail: evillareal@miamidade.gov Project: Miami-Dade Fire Rescue Station#40 4 Edward Villareal Construction Bureau Manager- Facilities Construction Division Miami-Dade County Fire Rescue Department 9300 NW 41"Street Doral, FL 33178-2414 Tel: 786-331-4503 Fax: 786-331-4501 E-mail: ALEDO@MIAMIDADE.GOV Project: Miami-Dade Fire Rescue ADA Barrier Removal I S Shari Lee, Director Miami Dade County Public Schools- Facilities Support Services Office of Capital Improvements 1450 NE 2nd Ave, Room 226 Miami, FL ' Tel: 305-995-1446 E-mail: saleeedadeschools.net Project: Miami Central Senior High School, Miami FL 6 Thomas L. Strickland Suncoast Autobuilders 5180 113th Avenue North Clearwater, FL 33760 Tel: 727-561-0764 Fax: 727-571-3773 . Email: www.suncoastservices.com Projects: Parking Garage & Facilities and Maintenance Buildings 7100 SW 99 ^ Avenue • Suite 104 • Miami, Florida 33173 • T 305.598.8383 • F 305.598.0023 AAC002050 • L83398 • www.jbonfill.com 1 J Bonfill&Associates RFQ#12-04-02 Page 106 4 FLORIDA INrEP.�urnowu:UNtvERsttY Miami}public research university I April 30;-2012 City of St nny:Isles Beach Government Center- 18070Collins Avenue I Siinny.Isles:Beach FL 33160 I Re: RFQ.12-04-02 Continuing ProfessionalArchitectural& Engineering Services ITO WHOM IT--MAY CONCERN , It is my pleasure to tender this recommendation of J.Bonfin&Associates,Inc.This firmw'as engaged by the IFlorida Intimatanal.University. Then eff'wcs have beenwell organized,coordinated and clearly communicated in the work product -This firm has been sensitive to our needs and in all,instances has reed�m a timY.el and professional manner. IThe conscientious roamer and dedication of this firm in the successful delivery of any project is notably commcoEable., The University would have no prublen with working with this firm I Name'of Project: Miscellaneous and Survey_Projects from 1989_to-present. (FIU Stadium, Medical School, Housing Complex,Law School,Graduate School of Business,College of Business Complex,Natural Preserve,PG• • . 5,FILL Stadium Expansion,Loop Road Expansion,U.S.Century Bank Arena Fxpansion,Parkview Housing,Greek Housing. Chiller Water Line Parking Housing Site, Street Traffic Circle, Stocker Astro Sciences Center, Solar IHouse, etc.) Scope of work:.Specific Purpose Topographic Survey, GPS Survey & Mapping Updates, Legal Descriptions, and Others miscellaneous projects IValve of projects: 5800,000.00 4- • I . Sincerely, Paulo.C.Costa I Senior Project Manager RealEstate Development&Planning I Real Fiore Development&Planning •Miami.FL 33199•Tel:(3051 3-18-4090•Far(305)348-4091•www.fiu.edu Nal. t aaV•..W Cy,e..-Ata-Ink!.r Iva•T^A.•fR i41:11.1,H`I 1 - • J Bonfill 8 Associates RFQ#12-04-02 Page 107 • Public Works and Waste Management Department MIAMI•DADE 111 NW 1"Street • Suite#1610 Miami,Florida 33128 COUNTY T 305-375-2960 F 305-375-3070 miamidade.gov April 25, 2012 I . To Whom It May Concern: General Services Administration Department obtained J. Bonfill & Associates as the prime consultant for architectural and engineering services for a S2.9 million dollar shelter for victims of domestic abuse in Miami. The design included a 40-bed dormitory; 3 kitchens; 2 laundries; nurse's station with 2 exam rooms; 2 congregation areas for residents; 2 employment training rooms for residents; high level security and monitoring • station; offices for a 12 person administrative staff; 8,000 SF interior playground courtyard with covered terraces; new secure driveway entrance; and landscaping. The service performed by J. Bonfill & Associates was outstanding and was surpassed only by the firm's professionalism and courtesy. Sinc- e Duane 77.pp, P.E. Senior Professional Engineer I • - • • 1 1 I • I J Bonfill 8 Associates RFQ 012-04-02 Page 108 I Miami-Dade Fire Rescue Department "t�F�� 9300 N.W.41st Street xC E 1 ' Doral,Florida 33178-2414 +Icr� T 786.331-5000 I _,!,`oSr ti% miamidade.gov Always Ready;(rood To Sean - I k+.ioglto.pwaled Dade County and the .MunldpJtles at .'it na• - I u_IRuh., April 25,2012 '"' " d` City of Sunny Isles Beach Sim ayst•f:nr 18070 Collins Avenue IDora Sunny Isles Beach,FL 33160 fl IbifI Re: Continuing Professional Architectural and Engineering Irlo'aacih Services. t.sl.m gnu • To Whom it May Concern, Ilu•n,ht;u,km Ia.^^t^^' The Miami-Dade Fire Rescue Department hired J. Bonfill Inaanlin.. &Associates as Prime Consultant for professional Architectural and Engineering services. The professional h services included Alteration and Remodeling construction m documents for The Barrier Removal Project Phases 1, II & ,mmi cath III of the Miami-Dade Fire Rescue Department. Various I ,wa:Lat., Stations were included in this project which consisted of the adaptation of the designated Stations for handicapped ,.:,mi Si.... accessibility. IMiami Spring. r.ai,eay%Az*. They were also the Architect of Record for the West Miami Fire Rescue Station No. 40 and the Design Consultant for NInih"iarni the Tamiami Fire Rescue Station No. 58. I \bolt Mimi Ifra Is 010-5xI l The services rendered by J. Bonfill & Associates surpassed above satisfactory in their professional capacity. IYAmrt.•Pap ine.."`t Sincerely,, , statah Miami farm w«. T}K A f ns Ledo "'""' Cons ruction Bureau Manager s,,..,,.a,. Facilities and Construction Division IWig ria Cr.Mn I".1,Iaa: I I I I RFQ 012-04-02 Page 109 4 Suncoast Suncoast Team Services AutoBuilders ■ Stricka ® Development Co. Can»I Caistn.,on April 26, 2012 1 City of Sunny Isles Beach Suncoast 18070 Collins Avenue DeigriOinop Sunny Isles Beach, Florida 33160 Re: Continuing Professional Architectural & Engineering Services To Whom It May Concern: I J. Bonfill &Associates, Inc. has worked for Suncoast AutoBuilders, Inc. on several projects. David Gee and Jacqueline Bonfill Gee provided architectural, consulting engineering and project coordination for the new Service Offices and Parts Storage at the Expressway Toyota in Miami, Florida, as well as the new automotive showroom and offices for Coral Springs Kia. The largest project J. Bonfill &Associates, Inc. has completed for Suncoast AutoBuilders, Inc. was the Ford of North Miami Beach auto dealership complex. The services for this project included architectural,structural, mechanical, electrical, plumbing, civil engineering, surveying, environmental impact studies, and site development, including zoning and DERM variances. • The services rendered by J. Bonfill &Associates, Inc. on all of these projects exceeded our expectations. I am pleased to recommend them for your projects. Sincerely, / a;- Thomas L. Strickland President I 1 51501131h Avenue North I Clearwater,FL 33760 I T 727.561.0764 I F 727.5713773 1 www.suncoastsenices.com li 1 - J Bonfill&Associates RFC/D12-04-02 Page 88 . I ' I • CL `ILI . 5 I �I / W 1 ( W 1 I-- 0 -0 1 �/� Zr.s.7 r4 v z W ' ) UT)I F, W F oU Z .'.3 Z 0 1 1 ` := t ' a x V v V tn 2 z Z1 -1 U) z ` ..E-cd p W Q o r4 rr 1 u. z z 170 ,•;_ z G W ° z x x 1111.1 LiQs. F Ce `:4;Ix- Qz d u .o z ❑ � � L� — W W G _ a O CS I � � oQ � cd o • W tn 0 W ri WI - Q O 0 W ...1 0W W _ ° z J -2 0 2 x WN -, .. c a Z t - I r 3 G ISL F W I � Wo N N 0 S H U Ir I mmi � , 1 < H. N G cc z O 0 0 M i. Q 0 j o W z Z LU >- g W W gl azz 1 WUJ J aQ W- Ce 1 : •1 i r -3 '-t I J Bonfill 8 Associates RFQ 412-0402 Page 92 • I ACORD_ .CERTIFICATE OF LIABILITY INSURANCE 0.„ • l 04/12 /2012 NT+DOIlI1cFn THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Gulfstream Insurance Agency, Inc. - ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 5833 Johnson Street HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 111 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.ollywood FL 33021- • INSURERS AFFORDING COVERAGE INSURED INSURER A Atlantic Casualty Ins. Co. • II J. Bonfill 6 Associates, Inc. INapga, FundFlorida Retail Federal Self Insurer d 7100 S.W. 99th Ave. N 104 ETS.RER •Casualty Company Miami m seusetDComerce & Industry Ins. Co. FL 33173- INSURERS II COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, . THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POUCIES. IAGGREGATE LIMITS SHOKN MAY HAVE BEEN REDUCED BY PAID CLAIMS. (NSR TYPE OF DSURANCE LTR POLIO'NUMBER POLICY EFFECTIVE PODGY DONATION A GENERAL W&;JTY DATE ItiW/DOh'YI DATE IMINIDINY1 LlMT6 / / / / EACH OCCURRENCE s 1,000,000 X COMYiROAL GFeER/%LVBSRY . FREDANAGE pay one fire) 1 100,000 _ twos MAle noccuR CL2343240 01/30/2012 01/30/2013 MED EXP(Any O,.Per>a) $ 5,000 PERSONAL ADV KURTs 1,000,000 / / / / GENERAL AGGREGATE a 2,000,000 GENT AGGREGATE UMR MPi1E9 FWt • PROUl1CT5-coAPNOPAUG i 1,000,000 IXi PODGY n JFCi n LOC / / / / AuroWBLEluvnnv Anv Auto / / / / C01C01413140ISINGLE urea EE..dr.To 1 ALL OWNED AUTOS / / / / — I - SCHEDU ED AUTOS sBOCILY WARILY (Pe pansE Rams/nos / / / / _WNgy®µnm BUORY NARY (Per accident) E / / / / PROPERTY DAMAGE I GARAGE LIA®MTY AUTO ONLY-EA ACC TT a ANY 41n0 / / . / / OTEA AOC $ AuTO rooItwy: AGO s • I D TxiEXCLasLJAyu4545862330 06/24/2011 06/24/2012 EAo1000RAea;E . s 4,000,000 °Catli 7Y admits "`E AGGREGATE _s 4,000,000 F _ DEOUCTEBLE / / / / II _ RETENTION L I 13 �, WIONAND 0520-26777 01/01/2012 01/01/2013 X Ir39 " 5I IGk EA_EACHAL0O-DST $ 500,000 / / / ' / El_OISFAAr.EA EMPLOYEE S 500,000 OTHER • Es.rn ^cr-PODGY NAT s 500,000 C Professional 113969871 05/22/2011 05/22/2012 AGPr.gatt unit 2,000,000 . Liability Per Claim ,..-,t 2,000,000 oESCRrimN OF OPERATIONSLOCATIONN MCLFB/E%LD61ON$ADDED BY ENIEDINEM9PmAL PRONSONS ADDITIONAL ENSURED: • I Ir CERTIFICATE HOLDER A I MTUUOLALWSUREq INSORoyIErrot CANCELLATION I ammo ANY OF THE ABOVE DESCRIBED POLICES 9E CANCELLED BEFORE T!E Oo1RATTON DATE TNFeroF. TEE ISmIEN0 semen Mal. LICEAVOs TO NM. I . 30 cawWRFTTEN NOTICE TO THE CERTEICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL IPPON NO 09LOATON OR W BILTY OP ANY IIID UPON TNR IIAURER.TTS A.. or OR REPRENNT I a ___ AVtEED THO ', ACORDY25$(7197) A ORD CORPORATION 1988 V(:11480255(iiEOA ri ELECTRONIC LASER FO $INC-(1)773317(1)773317-0515)NSSIS Page T CT I I J Bonfill 8 Associates RFQ#12-04-02 Page 89 1 I I' *tart Of 4t oath of -4* tiguterrs Nifah And Partn _ _ Engineers, Inc. C` t * Ls authorized under the provisions of S ; _ _.:.; .: + +a Statutes,tooffer engineering services 1 to the public through a Professional Engin :4 1 . ed under Chapter 471,Florida Statutes. Certificate of Authorization EXPIRATION:2/28/2013 CA. Lic. No: AUDIT NO: 228201301016 D 7302 1 1 1 i 1 1 J Bonfill&Associates RFQ#12-04-02 Page 90 1 f cdfr" a I U U Jf �, �yyT wpmyN qV OL ;\ l��traria rfj Lutt QL r manners its1 41 i " s to Samuel SchngtmI4ifah, P.E_ . SpecaPI spector - ' Is LICENSED-AS A PROFESSIONAL ENGINEER UNDER CHAPTER 471, FLORIDA STATUTES EXPIRATION:2/28/2013 P.E. Uc. No:48224 AUDIT No: 228201311227 SI S.I. UC. No:2036 1 • 1 1 1 1 S I II I J Bonfill 8 Associates RR]#12-04-02 Page 91 1 I • I�jLI O F V C U) • W 0 • in ,altr reO 1 /(^11 tL w . Zii • a • a ,.. a Q I r-`j' U si (•T -4tAt;s' - p VAC t. wp /7 .,�u, 'Q5 Z . � 4as ,s 0_ w ti = o I � " ° to 03 W LI a M IY V. tel • 4 -10-N0, N o • 111 idik) Qm0, N • Q N N w• z • O z U x L N W Q I I I 1 IFeb. 24. 2009 10:50AM N o R ziz 045Wage 110 .I MIAMI-DADE COUNTY FLORIDA IMIAMI,DIAD Capital Improvements Information System COUNTY Miami-Dade Fire Rescue Department Contractor/Consultant Evaluation EDP Project: EDP-FR-SR-WM-01 WEST MIAMIEvaluation Type: Standard Evaluation Title: FIRE RESCUE STATION NO.40 Contractor: J BONFILL AND ASSOCIATES INC. FEIN: 650133546 IDepartment Contact: Armando I. Menendez 7863314500 Award Amount $5,205.00 I Evaluator ID: ejv Date: 2/23/2009 Period: Project conclusion or closeout Rating, 4 3 2 1 N/A Criteria 1- .% Schedule - Quality of schedule &adherence to schedule • resulting in timeliness and minimizing delay to the owner and tcommunity. 2- Q. Cost effectiveness &efficiency-Budget compliance &value of work. I 3- _ Vision- Design - Concepts or adherence to criteria. 4- dCooperation-Teamwork & relationship with owner, subs and suppliers. I 5- ? r Coordination -Ability to organize, schedule and complete tasks in adherence to the schedule. 6- ':.% Accuracy &Technical Skills- Cost estimating, scheduling, shop and other drawings, plans, manuals, project documentation and conflict resolution. 7- TQ Completeness - Compliance with contract documents, Ipermits, Codes &standards. 6- J . Responsiveness -Timely, clear& concise responses to owner comments and correspondence. 1 9- { Commitment- Intangibles& contribution to project success. 10- :i/ Personnel - Quality and dedication of project staff. 11• *S. l — Management- Leadership ability. 12- *Si Quality-Work performed correctly the first time. Overall Performance Average: 4_0 IDocumentation that supports this evaluation and Contractor's/Consultant's comments can be obtained by contacting: IEdward Villareal at Phone'#786.331.4509 Evaluation Reviewed by: Supervisor E Division Chief r Assistant Director 0 Director C The method of delivery of this evaluation to contractor/consultant: Certified Mail 0 EMail C' Fax E Hand G I I . Feb. tin 24. 1099 10:ii AM N:• RFa r4061Po 12-O2ge 111 (Unresponsive Performance by contractor/consultant requires 2 delivery methods) Evaluation delivered to: David Gee *Rating Key 4 Superior performance-Exemplary quality, no intervention required-project completed on time or early at or below budget with no change orders or amendments other than owner requested changes. 3 Satisfactory performance-Minor errors noted, addressed with timely corrective action. No serious errors noted or corrective action needed. 2 Guarded performance Errors and Omissions documented in writing with timely corrective action. 1 Unresponsive performance documented in writing without timely corrective action. N/A. No Information I • • • 1 1 1 1 1 1 1 R)'4 Y1.04-0a Page %IL I • J Bonfill 8 Associates Or OF SUNNY ISLES BEACH I 18070 Collins Avenue , Sunny Isles Bench, Florida 3316D i ' s - 't, te 305=--"-7.060o i l I - - -. 4 . tsibi)ncl r 'n . . > 0 c '" ..0her I �`M1 of sup' I IDELIVER TO: REQUEST FOR City of Sunny Isles Beach QUALIFICATIONS OPENING: 10:00 A.M. city Clerk SECTION 6 I 18070 Collins Avenue 05/01/2012 Sunny Isles Beach, FL 33160 BID SUBMITTAL FORMS I IIssued by: Purchasing Agent Date Issued: This Bid Submittal Consists of 04/02/2012 Pages 27 through 30 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk I at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. I RFQ 12-04-02 Continuing Professional Architectural & Engineering Services Firms Only(CCNA) A Bid Deposit in the amount of I °,2 of the total amount of the bid shall accompany all bids I A Performance Bond in the amount of 212 of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach Procurement Agent: Finn Name: I tiarcanthony Tu/loch J . So FJ r I L L 0 XccccIsTES, NC . Commodity Cadets): 01pa, 00 fSrcLL-1-cdu,td Services- ' 'Pro fess' o tA a-( RETURN ONE 12)ORIGINAL ONE COPY AND ONE ELECTRONIC COPY ON CD OR OW OF BID •*�,�:.. SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN'PAGE 30 OF SECTION 6 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE City of Sunny Isles Beach !Request for Proposal No. 12-04-02 27 I . I ' s2FQ 12-04-0Z page 113 J Bonfill&Associates CITY OF SUNNy1SLES BEACH 18070 Collins Avenue Sunny isles Beach, floridn 33160 ( s sonsY +f f� 305^%.0500 ) vnwcsinthnet i 3{,0,,, 4Q� `cc r or sur+'`s n SECTION 6 • U BID SUBMITTAL FOR: QACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II,WHICHEVER APPLIES oPART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID OAddendum#1, Dated Li- -24 - 2012_ 2OAddendum#2, Dated - 4 - 20, - 20 12- 11 Addendum#3, Dated 4 - 30 - 20 12 Addendum#4, Dated 5 - 0 1 - 20 12_ Addendum#5, Dated Addendum#6, Dated IAddendum#7, Dated Addendum#8, Dated 1 PART II: 1 0 NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: J SOfJ FI LL 4SSocI AT-95, 11JG - AUTHORIZED SIGNATOR Lt,u2 I11 DATE: Lf -30- 20 12. TITLE OF OF E : PR ES ripe IJ T • City of Sunny Isles Beach I Request for Proposal No. 12-04-02 28 I 1 FtF412-04-oz 1,45e_114- .1 a5e114J Bonfill&Associates CII'i OF SUNNY IStES BEACH D13070 Collins A,venuc , Sunny Isles Beach,Florid(' 33160 swoo.a,er 305.947.060e °se o x^:rvsikil.rcl �Ir '11.;)r C,h UN � Or stir: ' BID SUBMITTAL FORM Bid Title: Continuing Professional Architectural &Engineering Services Firms Only(CCNA) The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of this or Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the other documents required by the Bidding Requirements within ten days ' after the date of the City's Notice of Award. In submitting this Bid,the Proposer represents, as more fully set forth in the Agreement, that: • The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. i • This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solidted any other Proposers to submit a false or sham Bid; the Proposer has not solidted or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. 1 City of Sunny Isles Beach I Request for Proposal No. 12-04-02 29 ' tzFa Iz-04-o2 F45e IS J Bonrill B Associates CITY OF SUNNY ISLES BEACH 18070 Collins iw.nue , Sunny Isle:Beach,Florida 33150 305.24 .060a It' 'y www.silIFtne: 2,a • , ...moo . ' Firm Name: .T. Bo&JFILL_ 46 4 eocf6Tss1 I Jc Street Address: 7( 00 SW 961444 AVE SUITE 104 Mailing Address(if different): MIAMI > FL 33173 ' Telephone No. 305 - 91 g• 3 S 3 Fax No. SO - gct goo 23 Email Address:jQCkie ej 6ovie(I•coFEIN No.4215-JJJ�Jg'LC2 1 t"By signing this document the bidder agrees to all Terms ' Signature: G"` ( at of authorized agent) Print Name: Jis-CQ U E L-I IJ E SoiJ Pl LL GEE tTitle: PRESIDEI.IT ' THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL ' NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. •1 City of Sunny Isles Beach I Request for Proposal No. 12-04-02 30 i 1 RFQ 12 -04-02 Pay. I I G J Bonfill 8 Associates CII':OF SUNNY ISLES BEACfi 13070 Collins Avenue Sunny Isles Batch,Ilorida 33 160 I Sutter+i+* 305.447Ao06 I ? � '&7 -..• •• / — , '•r_o'`o.4•r er+'nr of SU tt 14, AFFIDAVITS O B asyF � * FLOW\ 474 C/T y OF SUN PCO 1 1 1 1 City of Sunny Isles Beach !Request for Proposal No. 12-04-02 31 B I J Bonfill&Associates RFC]#12-04-02 Page 117 I cos"Is/ e os. - \s e +'? -P-�' at- ";1: NON - COLLUSION AFFIDAVIT City of Sunny Isles Beach •.. 79Callus Avenue •s io�`eo+'� Sunny Isles Beach:FL 33160 es.v 'TTelephone:(305)947-0606 Fat(305)949-3113 STATE OF FLORIDA ) I COUNTY OF AD E SAD Inc undersigned being first duly sworn as provided by law,deposes,and says: I This Affidavit is made with the knowledge and Intent that It is to be filed with the City of Sunny Isles Beach City Commission and that it will he relied upon by said County,in any consiceration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of. Is• BOK) FILL 4 ,+SSSoc,S-rES, Nr.(Name of Corporation,Partnership:Individual.etc.) I a, CO R.PO 12.Ar1 QiJ ,formed under the laws of FL (Type of Business) (State) of which he is JAG(�tLEL161E &OiJFILLGEC- I (Sole Owner.Partner.President.etc.) Neither the undersigned nor any person. firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned,have themselves solicited or employed anyone else to soicit favorable action for this Bid by the City,also that no need of any I department or employee therein,or any officer of the City of Sunny Isles Beach,Florida is directly interested therein. This Bid is genuine and not collusive or a sham;the person,firm or corporation named above in Paragraph 10.2 has not colluded,conspired, connived or agreed directly or indirectly with any proposers or person,firm or corporation,to put in a sham Bid,or that such person,firm or • corporation,shall refrain from Bidding,and has not in any manner.directly or indirectly,sought by agreement or collusion,or communication I or conference with any person,firm or corporation,to fix the prices of said Bid or Bids of any other proposers:and all statements contained in the Bid or Bins described above true; and further,neither the undersigned,nor the person,firm or corporation named above In Paragraph 10.2,has directly or indirectly submitted said Bid or the contents thereof,or divulged information or data relative thereto,tc any association or to any member or agent thereof. JACQUEL&E SO'JFILLGEE PRESIDEeJ 1 AFFIANT'S NAME AFF1ANT'S TITLE ITAKEN,SWORN AND SUBSCRIBED TO BEFORE ME this `hday cf Apr1 1 .200/2 . Personally Known k or Produced Identification , Type of identification T Was here) eat`UL�oc 0\ca��// . I NOTARY PUBLIC(name printed or typed) s"7",''. CATHERINE A.SMITH • E Notary Public-Slate of Florida • Ieiis ;-d My Comm.Expires Jan 24.2015 1,,,w0, ,+ Commission s EE 57675 I DECEMBER 2E,201D 1 of - I • . I . ' .1 Bonfill 8 Associates RFQ#12-04-02 Page 118 ' settr teu Ot 4' 1 c PUBLIC ENTITY CRIMES • City of Sunny Isles Beach - o� 18070 Cans Avenue '•swe� � Sunny Isles Beach FL 33180 '"0"" Te!ertone:(305)947-0606 Far(305)949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES,ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes- "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor,or ' Consultant under a Contract with any public entity,and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". 1 THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. • 11.1. This sworn statement is submitted to City of Sunny Isles Beach ' by .j/t.Cpapj=1 ,f�F bo1JI ILL GEE (pant intsname an tcej for J f $OIJ PI LL 4 Assoc(STES, I%JC rant rake of enLly subrnatng sworn stalenenl) t whose business address is: 7100 SW 9R` 4^ XV E _so (-re 104 ' I.A 1 .14.4 ( � Fl 33173 and (if applicable)its Federal Employer Identification number(FEIN)is GS • 01 33546 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn ' statement: .) 11.2. I understand that a "public entity crime'as defined in Paragraph 287.133(1)(g), Florida Statutes,means a violation of any state or federal law by a person 'with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including,but not limited to,any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust,fraud,theft,bribery, collusion, racketeering,conspiracy,or material misrepresentation. ' 11.3. I understand that'convicted"or"conviction"as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989,as a result of a jury verdict, non-jury trial,or entry of a plea of guilty or nob contendere. 11.4. I understand that an"affiliate'as defined in Para. 287.133(1)(a), Florida Statutes,means: • a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, ' directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair OREUFER78.2010 2 of 7 1 1 I . J Bonfill&Associates RFQ#12-04-02 Page 119 Imarket value under an arm's length agreement, shall be a prime fade case that one person . controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be Iconsidered an affiliate. 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to I enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners,.shareholders, employees, members, and agents who are active in management of any entity. I11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity ` submitting this sworn statement. (Indicate which statement applies.) I /r Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. IThe entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an _ affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, I 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an I affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1. 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer I determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list.(Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE I PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE)ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA ISTATUTES, FOR CATEGORY TWO OF ANY,CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: (444/ 114‘ �' C (S ,duef ' CO ELRJE 13OUJFILL GEE (Printed Name) 'FR ES lnQ-f. I )T (Title) Sworn to,and subscribed before me this .3 day of Apr/ l ,20) , by J'Cc9He/In-t an 71 eel- 1 1, gaggijit0 "tl""Ly., CATHERINE A.SMITH �C I 1 =° \ �` Notary Fabric•State ol Florida I Signature: Notary PublicState of Florida se • My Comm.Expires Jan 24,2015 I G�rrh:•vi n L iSfi i' f h `k; a,, Commission s EE 57675 I Print or Type Commissioned Name Personally Known X OR Produced Identification I Type of Identification Produced 10/1958 3017 I I . J Bonfill&Associates RFC!#12-04-02 Page 120 1 S0NNT'j (� EQUAL OPPORTUNITY / 4U4 (--,i4r•min4. no AFFIRMATIVE ACTION '• �`O City of Sunny Isles Beach • 4 18070 Cans Avenue Sunny Isles Beach,FL 33160 Telephone:(305)947-0006 Fax:(305)949-3113 1EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT • The contractors and all subcontractorshereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ' - ' ' ' p ci Title: P ' Es JE r.J T Firm: .,J . $OLiPI LL 4 £E CC%LTS, fits . Address: 7100 S v\/ 4 944^AV E go f'tE 104 f MI .&MI > r-L 33173 1 1 1 1 1 Ocm4e[a 28,2010 4 of 1 t ' J Bonfill8 Associates RFC)012-04-02 Page 121 , • DISPUTE DISCLOSURE alp City of Sunny Isles Beach .'. -. - \or �`Yo•• sAvenue Sunny Isles Beach, FL 33160 o.on• Telephone:(305)947-0696 Fax:(305)949-3113 • DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer"Yes", please explain in the space provided,or on a separate sheet attached to this form. • 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the • Department of Professional Regulations or any other regulatory agency or professional associations within the last five(5)years? YES NO X t 19.2. Has your firm, or any member of your firm, been declared in default, terminated.or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO J� 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of ' business? YES NO If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. • I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. J • $01JFILL +Ass°cisMs :NG o- • 3Q - 2012 Frm f Date Jbcau£LWE SDOPILL GEE ' .rizz• Signature Print or Type Name and Title 1 DECEMBER 2e,MC 6 of 7 • 1 I J Bonfill 8 Associates RFQ#12-04-02 Page 122 II =� `dr ! ANTI - KICKBACK , • t �• City of Sunny Isles Beach \,o,. 16070 CnRns Avenue' r�oj„� Sunny!skis Beach,FL 33160 ''w so•' Telephone:(305)947-0606 Fax:(305)949.3113 I ANTI-KICKBACK AFFIDAVIT ISTATE OF FLORIDA ) ) I COUNTY OFMI4MI - DST>a I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid ' will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. t / By: acc4� BONFit_L 1 Title: PR esitekST TheII • foregoing instrument was acknowledged bef,preme this cion' day of ��/ J / 20) 1 by JRCG)NP_.1/reef�OiJ�-i//bee_ [name 01: ersop],], as r�. - * [type of authority], for II J• n¢l Jf tv-d .. IO S,.Tf,X; [name of party on behalf of whom instrument was executed]. ` I - AFFIX NOTARY STAMP HERE: 0�' / ///�' / 7 ' Notary Public— State of Florida a'...... CATHERINE A.SMITH 1 / �L /1 4 e t'- Notary Public•Stale Cl Florida 1 LC?-/ 1 en ,_ /1 g/ _�n�1 c • •• My Comm.Expires Jan 24,2015 I '1 /!K /-r ?dot Commission if EE 57675 I Print or Type Commissioned Name Personally Known X OR Produced Identification I Type of Identification Produced I . I . Decode£&28.2010 7 d 7 I • I J Bonfiill 8 Associates RFQ#12-04-02 Page 123 I ,VNNY isle e�/.�lGi�\r I c CONFLICT OF INTEREST "I*; I City of Sunny Isles Beach \ -O. . • . 18070 Collins Avenue •s v oF��o Sunny Isles Beach.FL 33160 ''or so.' Telephone:(305)947-0606 Fax:(305)949-3113 ICONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must I . disclose with their Bids,the name of any officer,director,partner,associate or agent who Is also an officer or employee of the City of Sunny Isles Beach or its agencies.. STATE OF FLORIDA I COUNTY OF MI6MI — DDifibDE BEFORE ME, the undersigned authority, personally appeared -MCC?UFLI UE BnsIFILL RF.iblho was duly sworn, deposes.and states: I 18.1. I am the PRESI•DEk1T of J•So1J PILL 4 Assoc- lit with a local office in -no pgtJ qq AYE MI8'M1 PI and principal office in SAME. Les CATIO/J 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bld No. 1t 04 -02 described I as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has Ino financial interest in other entities submitting Bids for the same project 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement participated in any collusion,or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for - . I the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 183 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State,or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients,contracts,or property interests for this project. I 18.7 I certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management,or staff has a vested interest in any aspect of the City of Sunny Isles Beach. I . 18.9 In the event that a conflict of interest is identified in the provision of services, I,on behalf of the above named entity,will immediately notify the City of Sunny Isles Beach. Dated this Earn day of r I � 20201,111./,Z, I pw a 3jy%4 C reJAtct UPLf14F En[IPILL GEE FI T Print or Type Name and Title � 1 I SLyerh to and subscribed before me this.3S day of ,'y'ry ,201 - Personally Known OR 1 0 Produced Identification ;Type of entification . Q ii� ' NOTARY PUBLIC STATE OF FLORIDA (//(If I •p'^1t �• CATHERINE A.SMITH • Notary Public-state of Ronda +y� My Comm.Expires Jan 24.2015 ':w..r Commission/EE 57875 Dcco..3mu.m10 ow 21_�t - - ... 1 J Bonfill&Associates 01-00120402 f , 124 State of Florida Department of State 1 I certify from the records of this office that J BONFILL AND ASSOCIATES INC. is a corporation organized under the laws of the State of Florida, filed on July 14, 1989. The document number of this corporation is L02047. I further certify that said corporation has paid all fees due this office ' through December 31, 2012, that its most recent annual report was filed on March 6, 2012, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. 1 . I Given under my hand and the Great Sea!of Florida, at Tallahassee, the Capital, this the Seventh day of March, 2012 Oa Secretary of State 111 =A1 Authentication ID400223935464-030712-L02047 7JD WE .i - To authenticate this certificate.visit the following site,enter this -- ------ ID.and then follow the instructions displayed. https://efile.sunbiz.org/certauthver.html 1 1 • I J BonfiII&Associates RFQ#12-04-02 Page 125 • Sustainability, Planning and Economic MIAMI RADE Enhancement Department COUNTY 111 NW 1 Street, 19th Floor Miami,Florida 33128 miamidade.gov I T 305-375-3111 F 305-375-3160 CERT. NO: 1259 March 12, 2012 Approval Date: 04/30/2012-CBE Tier 1 I Expiration Date: 04/30/2015 Ms.Jacqueline Bonfill Gee ANNUAL ANNIVERSARY: 04/30/2013 J. BONFILL AND ASSOCIATES INC. 7100 SW 99th Ave, Suite 104 IMiami, FL 33173-0000 Dear Ms. Bonfill Gee: ISmall Business Development (SBD), a division of Sustainability, Planning and Economic Enhancement Department (SPEED) has completed the review of your application and attachments submitted for certification. Your firm is officially certified as a Community Business Enterprise(CBE) in accordance with I section 2-10.4.01 of the Code of Miami Dade County. • This certification is valid for three years provided there are no changes rendering your firm ineligible for certification. You are required to submit a 'Continuing Eligibility Affidavit" annually with specific supporting I documents on or before your Anniversary Date as listed above. You will be notified in advance of your firm's Anniversary Date. Failure to comply with the said responsibilities may result in immediate action to decertify your fine. Every three years you will receive a full recertification review that may include an onsite investigation; SBD will also notify you accordingly. IIf at any time during the certification period, there is a material change in your firm, including, but not limited to ownership, officers, Director, scope of work being performed, daily operations, affiliations with other business (es) or physical location of the firm,-you must •notify this office in writing within (30) days. I • Notification should include supporting documentation. You will receive timely instructions from this office as to how you should proceed, if necessary. I Your company is certified in the following categories as listed below, affording you the opportunity to bid and participate on contracts with small business measures. Please note that the categories listed are very general and are used only to assist our customers in searching the directory for certified firms to meet contract needs. The directory for all certified firms can be accessed on the Miami-Dade County SPEED website http://wwwv.miamidade.godsba . I Thank you for doing business_with•Miami Dade County. Icellrelly Md Gd , Director I Business Opportunity Support Services Small Business Development Division Sustainability, Planning and Economic Enhancement Department I CATEGORIES: (Your firm may bid or participate on contracts only under these categories) ARCHNECRJRE(CBE) SURVEYING AND MAPPING-LAND SURVEYING(CBE) AERIAL PHOTOGRAMME 1HY(CBE) I ARCHITECTURAL CONSTRUCTION MANAGEMENT(CBE) ADA TITLE II CONSULTANT(CBE) UNDERGROUND UTILITY LOCATION(CBE) I . . . ' 1 oanRtll:O v201111126 I J Bonfill.4 Associates RFQ#12-04-02 Page 126 1 Ms. Bonfill Gee J. BONFILL AND ASSOCIATES INC. March 12, 2012 Cert No: 1259 CATEGORIES: (Your firm may bid or participate on contracts only under these categories) ARCHRECRJRAL SERVICES(CBE) SURVEYING AND MAPPING(EXCEPT GEOPHYSICAL)SERVICES(CBE) c: Karla Ikons. Certification Specialist Veronica Clark, SPEED, SBD I I 1 1 I 1 1 1 1 I Da0111:021.20111026 1 ' J Bonfill 8 Associates RFC/612-04-02 Page 127 t Sustainability, Planning and Economic MIAMI QADE Enhancement Department COUNTY 111 NW 1 Street, 19'"Floor Miami,Florida 33128 miamidade.gov T 305-375-3111 F 305-375-3160 CERT. NO: 10637 Approval Date: 04/30/2012-MICRO/SBE March 12, 2012 Expiration Date: 04/30/2015 Ms. Jacqueline Bonfill Gee ANNUAL ANNIVERSARY: 04/30/2013 J. BONFILL AND ASSOCIATES INC. 7100 SW 99th Ave, Suite 104 Miami, FL 33173-0000 Dear Ms. Bonfill Gee: Small Business Development (SBD), a division of Sustainability, Planning and Economic Enhancement Department (SPEED) has completed the review of your application and attachments submitted for certification. Your firm is officially certified as a Micro/Small Business Enterprise (MICRO/SBE) in accordance with section 2-8.1.1.1.1 of the Code of Miami Dade County. This certification is valid for three years provided there are no changes rendering your firm ineligible for certification. You are required to submit a "Continuing Eligibility Affidavit" annually with specific supporting documents on or before your Anniversary Date as listed above. You will be notified in advance of your firm's Anniversary Date. Failure to comply with the said responsibilities may result in immediate action to decertify your firm. Every three years you will receive a full recertification review that may include an onsite investigation; SBD will also notify you accordingly. If at any time during the certification period, there is a material change in your firm, including, but not limited to ownership, officers, Director, scope of work being performed, daily operations, affiliations with other business (es) or physical location of the fine, you must notify this office in writing within (30) days. Notification should include supporting documentation. You will receive timely instructions from this office as to how you should proceed, if necessary. Your company is certified in the following categories as listed below, affording you the opportunity to bid and participate on contracts with small business measures. Please note that the categories listed are very • general and are used only to assist our customers in searching the directory for certified firms to meet contract needs. The directory for all certified firms can be accessed on the Miami-Dade County SPEED website http://www.miamidade.gov/sba Thank you for doing business with Miami Dade County. cerey, L hen 1cGri-, Director Business Opportunity Support Services Small Business Development Division Sustainability, Planning and Economic Enhancement Department CATEGORIES: (Your firm may bid or participate on contracts only under these categories) CONSULTING SERVICES(MCR0/SBE) ARCHITECTURAL CONSULTING(MICRO/SBE) ' c: Karla Licona, Certification Specialist Veronica Clark, SPEED, SBD i 013D0.0020 v11I1102.6 I I . J BorthII 8 Associates • RFQ#12-04-02 Page 128 .. . . ............... ........ ......... ..... .... . ::•.- .:::.• -••••-•-•-::-. . - - - •-- -.:,..- •--.••.::::• :•:.::•:..:- ... . . .:..-...:.::::::.:-.:•:..,.::::: -- - -- - -• Small Business Development I MIAMHDADE -:!:!;:: -::•-•::::::.:.:Q: ::,:::.;...;.;:....:....:............:::::::;-:-.;;;;:;:: ].;,. -:: - 111 NW 1 Street, 19'"Floer••,:c: T 305-375-3Mtlia1mFi'3FOI°5-113d7a5-3331V608 ....COUNTY ....... .. . .. mzanzdade guy -..: -- :•:. -.._--- --:- - - • -- - - - ;;- -- • -- -::::•• •••• • • •••::' :- - • - CERT NO:-2472 -• --- ;* '•::::::. - - - -- - - - ----; : ''.• '•,• ; ::::.: '' - : - --- ----:•••:••••:•*:- :,• -:::' .:•: - . '-'Approval:Date!:951/2011:•F:daLtier..) : ;'-';'•- --::-::::::::-;:•.;::•••: ii :•::::::::77j:7 7 August22 201-1::.,::::::;::: :::: - ;; •!: ::E: ::---: ; :;•!:::i;::: - - if-:Ekeiritiori-Dat&i05/31/201*-::;•;-";:HE::•-';:'::::EEE'E E E-• 'El'EEE;E •EE:E;•E7'•E' IE I '. --„:--. : M • NelsonVital.- • A :: .,..,• :..:.7.: ANNVALNNIVERSARY:•05/31/2012:;_.:; *-.; ::„-:.. ...:::.-..:i;••:: :::::.:•• 1 . : •- E tleci-StAt 91th:AVe;-Siiite.#20 :•E'iDl;:fi:.I.:: :--::::- ;;-::-:::- • --;;;;- ;;; --:::•- : : ••- - :•:::;: :::• !:• •ji!::: :•••: ';!'f;i:;:•.':-; IMiami FL 33173 :•::: Dear Mr.yitak.--:'-- 1 '-' - . ---- -.:: - • • -• - --- -.--- - ::..'..: --• ' s '''"''''''4- • ::"--.: .-. .-The Department of Small Business Development(SBD)has completedithe review of your application• n •: --"'•: - • - ; -- :..::-.:.- attachrhenfeSubtnittedfOr certification Your firm is officially certified as:a;Community Business Enterprise ----- :-• : ::--:.-: 1 : - -- (CBE) In accordance with sectiOn:?-12,4.91'bithe Code of Miarrii;bid-e•dobniy. : _ • - - :- • - - .' . i- .-: . . .. . .. . ... . . ; . . ; ; . - : •. - . --. -. . ... . . . .. .... ; , . : --- . ; . .-.- _ • •.-• - •- - .. . :.- • .. . : • .•••• • I . . .. ... . . . . . - •.'. .- - This certification is.valithforffiree'yearS]provided thers;arp:norchangesreriddriog yolk:firth:ineligible for '. L-. certification You are required to submit a tentifiting•Efigibility•AffidaVieinnUaliy with specific supporting :•• • - -; , documents on or before your Anniversary Date as listed above You will be notified in advance of your . . I l;- : . firth's:Anniversary Date. Failure to comply Withthe'said responsibilities may result in immediate action to - . . - :- decertify your firm. Every three years you WilliedeiVa-alull reaertifiaatidrecertificationreViewthat may include an.. - . • : ; - • onsite:inVestigatibth•SBD will also netifilViiti accordingly.:-±•:..-:-...: :.. •: :. : --: • - - : • : --- .: • -- •• - •• * i - If at any time during:the certification pericxli there leith•thaterial;thargein your firm: including,'but not . • • 1 I .:. . . limited tOesioinership-:officers pireetoripbpe.6Cwork beiti§:Perferitied :dailytiOeratiohal-iffiliatidOS:Wittl•• 2 • • : • .,... ..... ..... .. . ,. .. ---: . . . . . :- - - - other business (es)or toCatiOn;i5L the firm;iyoumuSt thisnOtify -offiCe inwritiog:*ithin.pay aiy.:.. _Notification should i 4i:1We:supporting'thictithentationt.YOu Willisceive':fimely:instructioris:frOM:this office - : • .. _.„.......... ,.. •r .. ... . .. . . • 0 . ... . . ... . .... ... .,.,•.: •.•••. . • - •• - as to how you should proceed if necessary Your eorhpanyis certified in the follcilking'cateories•as listed below, affordingóu the oppOrtunitY.to bid • and participate on contracts with small business measures: Please note that the eate§brieS listed are very • . Igeneraland'rere usecfoidy to assist our customers in searching the directdry. for:certified firm- a to meet - _ .. .. .contract needs..The,directory for.all certified firms can be'accessed °lite Miami-Dade County SBD - website http•Awv.w.miamidade.govisba .• - • . ' - ' ..: .• ; . • . . . . . •- Thank you for doing business with Miami Dade County. . :• .. . • . . . . .- . . . . . - - . - . . . . . . . . . . .. .. . .. .•• - . . . . . . . .. . . . li •• . . . •. - • • • . • • • . . • 1 I - . ape•Townsley - e: -ctor:.- - . . • • . ' • . . . - • . • . . . .-:. -.. . . • ) . . . . . . . . . . : • • . • . . : I CATEGORIES: (Your thin may bid or participate on contractsbthese nly under categories) TELECOMMUNICATIONS SYSTEMS(CBE) - . . . GENERAL ELECTRICAL ENGINEERING(CBE) . • I• ENGINEERING CONSTRUCTION MANAGEMENT(CBE) .. . I ' VALUE ANALYSIS/LIFE-CYCLE COSTING-GEN MECHANICAL(CBE)- -- -. VALUE ANALYSIS/LIFE-CYCLE COSTING-GEN ELECTRICAL(CBE) .-; - HIGHWAY SYSTEMS-LIGHTING(CBE) • . . - • • . I I ENGINEERING SERVICE (CBE) , . .. •• :- • . - P -,RIHCe-Itt-5R-Mifilki.el...74I,;:tri*i. I . . '. .- • Aec,,--54,4fqe•-43.glia. ,-.,: zr,,,. tir.e!.4. • • i • - , .. . ± . . ... .. • cc . •.• . . .• .. '-• -- litat*:4,:rikr.. ..-a\t, --e-:2404-ht.->;:!t.,: Karla Liana, Certification.7 Specialist : - .. - • . ilit,14-4-V-1.1‹-ilaPATA-c7.:2;;n:•.:etp:44, - 'Er: •E'-.41;;;:e.:W i I 77';•••:.;;:7R; ..ii. 7-i-771:„--. -1-5%cnir-7._ : -r.--.i4,4- ;,: ::: • ,,,.•• -,;•;-4e-ni ; I • , . . :- -: -I-I'. " .•'.E I:: :''''II''•-'2....." '-I -1•".•I '-I.3.-I- 714-i---:--r;- •,•-•-i-&•:,;•fr.;---4/1::-;.:•.: %.t,,,2•;;-:••-• c.4s r•-•_. -.. ,s71.;•A::t-,:' : - I " - - - -• - -••: -• •- • • —• -• - /4 elcrerm r.-c.-- e-i.:;lterit.,:-_-.;air . . . . - - girzy; titt:ti a 7:?tifazt•--im's' antir7,11".:1-sitrFV;;WV"-ll'iikttl•R: r-,1?-;_ ' 4- cil;l:' ; 71 tit fix-• -4.I-7•41,.,---,7,..p.,-, exkti • . • . • • . . . . . . • ..• . 1 ---a. 41/2-A' . * @ ; t' i 1/4.: I ,Ri it-- ;;;:yet:: - • -, -., •- • R --st--4*-- Lr- -7 ::=-4740,h*F •;!;i41..,, t'ete•i:Mbintifitt-C--z. • 5.aci"iiiitgaiTtliiiilEkiicit?..t?`"-. - . . . I - J Bonfill&Associates RFQ d12-04-02 Page 129 : Small Business Development I MIAMI= MN 1 Street, le Floor COUNTY Miami,Florida 33128 T 305375-3111 F 30.5375-3160 Imiamidada:gov CERT.NO:10573 I - .- APPROVAL DATE(s):pit42)11-MICRO/SEE May S,2011EXPIRATION DATE 00131/ 012 Mr.Nelson Vital. I . VITAL ENGINEERING,INC: 7100 SW 99th Awe,Suite#202 Miami,FL 33173 I " Dear Mr.Vital: The Depertrnerrt of Small Business Denial pmol(SBD) has couplet dthie review of sour application and• attachmentssubmitted for certification. Voir firm is officially certified as a Micro/Small Business I . Enterprise(MICRO/SBE) inthecatega-ieslistedbelow. This certification is send for twehe(12)months,which will expire on May31,2012.Thiscertification affords )our company the opportunityto benefit from participation in county contracts with small business I measures. Please rote the trade categories listed below. These are the only sheltered market areas that your company is elig ible to bid or participate in under yaw current certification. , I . If any changes occur within your company during the ca-tification period (such as ownership, address, telephone number, trade category, licensing, technical certification, bantling capacity, or if the business ceases to coast) yon are required to notify this department within 30 days in writing. It is of critical imp rta Ice that current information regarding sour company be maintained. All inquiries or changes related I to this certification should be directed to Karla Licosa at Irlicona@miarnidade.gov in the Certification Unit An application for re-certification must be submitted and forwarded to this office fair(4)weeks prior to the referenced expiration date. Should sac firm fail to re-catify, or lose its certification for any reason,the ability to work on contracts with measures will be affected. Thankyou for doing business with Mian-Dade • I County , y af I ,,v /..-. .j ecta - . • iATEGORIES:(Your firm may bid or participate on contracts only under these categories) ENGINEERING CONSULTING(MICRO/88R) I I - _ ' L.: IJ Bonfill&Associates O. • 1 Ph�j I a w. 0:' Q L' I o Z b 71v V Liz ,_94 Aa 92 1 1 + 4 a c • O Z w . � .r, U m CO vo n 1 • V CU 0 ft 1 M o u in LLi 1N Ci 0-4 oit d CD 4 CD a I c a. � N a) -� o co I W o o y _ N un (o W M m I 7 4e. sitY--lip i> ... I-4 ot8 _ coN a r-i O ii U In Citi.,,. ` ` N it � � Nco o u in aJ Oea 43 oo 1 0 up 0 9.. 1 I J Bonfill 8 Associates RFC/#12-04-02 Page 131 • I I PQ Certificate No.: 2010-650804260-07 Approval Date: 813/2011 • ExPiratlon Date: 8131/2012 • Miami-Dade County, Florida IDepartment of Procurement Management(DPM)' c 4:-- „.-_-.. 3..t.1:--- - 7,.i .�:- e5tl t �1 � ,�'Fdi AlL t�1 z�—..--_ ti � t Mirmti riebtorbytmrdee: Nifah and Partners Consulting Engineers,Inc. 1 8785 SW 165th Ave.,Suite 108 • Miami,FL 33193 I The above name applicant is pre-qualified to provide professional NE services for Mlamt-Dade County jot the period iMitated above. The applicant has committed its firm to comply with the specific conditions listed below • 1. . Pre-Quafdied to offer professional services only in the Mlaml-Dade County technical categories shown in the attached'Statement of Technical Qualifications?All technical categdry restrictions must be strictly adhered to. 2. Pre-Quern-kation Certification.(PQC)consolidates the technical certification,affirmative action plan,and vendor registration into one streamlined certification process resulting in the issuance of a Pre-Qualification Certificate. h I . 3. Report any significant changes, such as contact person, qualifier, ownership, firm address, etc., to DPM's Professional Services Certification located at 1111M 1°Street,Suite 1300,Miami,FL 33128,within 30 days of such a change. Failure to report said changes to the County may result In the Immediate suspension or termination of your firm's Pre-Qualfication Certification. ' .4.. Firms are responsible for observing and adhering to Mlaini-Dade Countye Administrate Order 3-39'Standard process for construction of capital improvements,acquisition of professional services, construction contracting, • 'change orders and reporting". . . 5. Failure to renew your firm's PQC at least thirty(30)days prior to your firm's current expiration date may result in the suspension and/or termination from County programs and currant or future contracts until your firm's Pre- Qualification Certification has been properly renewed.Any lapses in the certification of any of the required PQC areas(vendor registration, affirmative action plan, or technical certification)will result in a lapse In your PQC. I • i-unns are reapon asiiTe rf ry ng and atenng to al submtssnon di:adlines. • 6. Any-renevre4appliesUoas-and/or-supporting-deeamentssubmltted2ReF the-epplleatietrdeadUnemlght-delay-the • review of your trm s'FQC certification to the next avasablrr ffnaal Certification Committee meeting. The I POC application, submission deadlines, and the Technical Certification Committee meeting calendar can he found on DPM's web site located at htod/wWw.miamidade-oov/dpm/pacasp 7. Permit Miami-Dade County representatives to have access during normal business hours to audit books and ' records to verify information submitted with this application. This right of access shall commence on the approval date of this certificate and shall terminate on its expiration date. Please note that If at any time Miami-Dade Countys has reason to believe that any person or firth has willfully.and !glowingly provided Incorrect Information or made false statements,the County may refer the matter to the State . Attorneys Office and/or other investigative agendas, initiate debarment procedures, and/or pursue sanctions or other legal remedies in accordance with Miami-Dade County posey and/or applicable federal,state and local laws. .. If you have any questions regarding this certificate,please contact 305)375563 .76 MIAMI-RADE Nubia Jarquin . CO(1tiTY Professional Services Certification I . I 1 • J Bonfill8 Associates - RFQ#12-04-02 Page 132 Samuel Nifah From: Jarquin,Nubia(DPM) <larquin@miamidade.gov> Sent: Friday,August 12,2011 8:56 AM To: snifah@nifahpartnerscom Subject: Nifah and Partners Consulting Engineers,Inc.-AAP#0096-0427-PQCTC approval notice Attachments: Nifah and Partners Consulting Engineers,Inc PQCTC 0803201Lpdf I MIAMI0DADE t0UNi1' Affirmative Action Plan Expiration date: 8/31/2012 • Pre-Qualification Certification Expiration date: 8/31/2012 Technical Certification Expiration date: 8/31/2013 <<Nifah and Partners Consulting Engineers, Inc PCICTC 08092011.pdf» • Affirmative Action Plan Approval Notice Your Affirmative Action Plan (AAP)for 2011-2012 has been approved. Your AAP approval is effective until August 3fi,ZO/Z. Your AAP expiration data coincides with your firm's current Pre-Qualification Certification Rao expiration date as mandated by Miami-Dade County Administrative Order 3-39. For your convenience, AAP information is available from our website.The below link directs you to a report of companies in alphabetical order, including the AAP number, approval date and expiration date. This information can be accessed at any time and will replace the mailing of annual AAP approval letters. Please be reminded that Miami-Dade County requires the submission of a current Affirmative Action Plan on an annual basis. Renewal applications can be downloaded from our website and must be submitted to the Department of Procurement Management thirty (30) days prior to the AAP expiration date. The processing time for the review and approval of an AAP file is approximately ten (10) business days, provided all necessary information has been provided. Be advised that the PQC and the AAP are to be renewed on annual basis, be mindful of the different year(if there is any) between the renewal of the technical certification and the Affirmative Action Plan/Prequal'rfication Certification In the event of a change in the firms name, address, telephone number or dissolution of the firm, it is the firm's responsibility to notify this Department in writing within thirty (30) days of the change. • 1 t . 1 1 - J Bonfill 8 Associates RFQ#12-04-02 Page 133 Please access our website at:www.miamidade.aov/dpm/aap.asp also, if you have any questions,' please contact a representative in the Vendor Services Section, Affirmative Action Plan Unit at (305) ' 375-5637. • Sincerely, 1 • Nubia R.Jarquin.A03 Requalification Certification and Affirmative Action Plan • Verdar Servicer Section Department of Procurement Management . 1 /11 NW 1st Street, 13th Floor • • Miami,FL 33128 Telephone:(305)375.5637 • Far.(3051375-5688 • "Delivering Excellence Every Day" • • • • Please coaster the envLonmeN belore printing my e+nal. ssinnFpade County is aoutfit entity floret to Chapter tl9 of the fordo Stows cantons*,pubes records. Finattmessages ere carved under sash Ars and Nva subject to disclosure. •1 1 Information from ESET Smart Security, version of virus signature database 6330(201 10727) - 1 The message was checked by ESET Smut Security. • http://www.eset.com •1 • 2 II I J BonfilI 8 Associates RFO 412-04-02 Page 134 I 1 MIAMI-DADE . Miami-Dade County Office of Capital Improvements • Statement of Technical Certification Categories Firm: NIFAH AND PARTNERS CONSULTING ENGINEERS,INC. 8785 SW 165th Ave.,Suite 108 Ward,FL 33193 CATEGORY APPROVAL EXPIRATION INO: CATEGORY DESCRIPTION DATE DATE 1.03 TRANSPORTATION PLANNING-AVIATION SYSTEMS AND AIRPORT 8/32011 8/31/2013 MASTER PLANNING I - 2.02 • MASS TRANSIT SYSTEMS-MASS TRANSIT FEASIBILITY&TECHNICAL 8/3/2011 8/31(2013 STUDIES I 2.05 MASS TRANSIT SYSTEMS-GENERAL QUALITY ENGINEERING 8/3/2011 8/31/2013 3.01 HIGHWAY SYSTEMS-SITE DEVELOPMENT AND PARKING LOT DESIGN 8/3/2011 8/312013 3.02 HIGHWAY SYSTEMS-HIGHWAY DESIGN 8/32011 8/31/2013 3.03 HIGHWAY SYSTEMS-BRIDGE DESIGN -worn 8/31/2013 4.01 AVIATION SYSTEMS-ENGINEERING DESIGN 8/'32011 8/31/2013. - I5.01 PORT AND WATERWAY SYSTEMS-ENGINEERING DESIGN 8/3/2011 8/312013 ' :8.01 WATER AND SANITARY SEWER SYSTEMS•WATER DISTRIBUTION AND 8/3/2011 8/31/2013 ISANITARY SEWAGE COLLECTION AND TRANSMISSION SYSTEMS 6.02 WATER AND SANITARY SEWER SYSTEMS-MAJOR WATER AND 8/3/2011 8/31/2013 SANITARY SEWAGE PUMPING FACILITIES 1 11.00 GENERAL STRUCTURAL ENGINEERING . 8132011 8/31/2013 —1800--GENERALefvtt-GeINEERIN"- , I 17.00 ENGINEERING CONSTRUCTION MANAGEMENT6/3,2011 81312013 19.04 VALUE ANALYSIS AND LIFE CYCLE COSTING-AVIATION SYSTEMS 8/32011 8/31/2013 I 19.11 - -VALUE ANALYSIS AND LIFE-CYCLE COSTING GENERAL STRUCTURAL 8/32071 8/312013 'ENGINEERING 19.16 VALUE ANALYSIS AND LIFE-CYCLE COSTING-GENERAL CIVIL 8/3/2011 8/31/2013 ENGINEERING I - bile(A e t; k 1, a /,1, Luisa M.Millan,R.A.. Chairpersal • _ Chief,Professional Services Division 1 Office of Capftal.hnprovemenls • • 1 I J BonfilI B Associates RFQ k12-04-02 Page 135 Small Business Development MIAMFLIADE 111 M Floor . ICOUNTY T305-375-3111 F305-375-3160 miamidade.gov. I CERT.NO; 10606 • October 31,2011 Approval Date: 10/28/2011 -MICRO/SBE Expiration Date; 10/31/2014 Mr.Samuel NitahI . NIFAHAMD PARTNERS CONSULTING ENGINEERS, ANNUAL ANNIVERSARY:10128/2012 INC. 8785 SW 165th Ave,Suite 108 Want, FL 33193-0000 • I Dear Mr. Nifah: Small Business Development (SBD), a division of Sustainablity, Plaming and Economic Enhancement Department (SPEED) has completed the review of your application and attachments submitted for certification. Your firm Is officially certified as a Micro/Small Business Enterprise (MICRO/SBE) in accordance with section 2$.1.1.1.1 of the Code of Miami Dade County. This certification Is valid for three yeas provided there are no changes rendering your firm ineligible for •I certification. You are required to submit a'Corntirluing Eligibility Affidavit'annually with specific supporting documents on or before your Anniversary Date as listed above.You will be notified In advance of your finny Anniversary Date. Failure to comply with the said responsibilities may result in immediate action to decertify your firm. Every three years you will receive a Gil recertification review that may include an onsite I Lmestlgation;SBD will also notify you accordingly. If at any time during the certification period,that is a material change in your firm,including,but not limited to ownership, officers, Director, scope of work being performed, daily operations, affiliations vdth other I business (es) or physical location of the firm, you must notify this office in writing within (30) days. Notification should Include supprzthrg documentation.You Mil receive timely instructions from this office as to how you should proceed,if necessary. I Your company is certified in the following categories as listed below,affording you the opportunity to bid and participate on contracts with small business measures. Please note that the categories listed are very general and are used only to assist our customers In searching the directory for certified firms to meet contract needs. The directory for all certified firms can be accessed on the Miami-Dade County SPEED Iwebsfe http://vrrvw.mlamidade.gofsba. Thank you for doing business with Miami Dade County. B. N. Sheri McGill', :i or Business Op nun! Support Services • I . Small Business velopment Division tainability,Planning and Economic Enhancement Department ll • . CATEGORIES:(Your firm may bid or participate on contracts only .under these categories) . .. ENGL`EERPio CONBULTNO(MICROISBE) ' c: Karla Licosa, Certification Specialist .. I • Veronica Oafk,SPEED, SBD Y t I I I I J Bonfill 8 Associates RFQ#12-04-02 Page 136 I Small Business Development M IAM I DADS 111 WI 1 Street, Florida 33128 ll COUNTY T305-3753111 F305-375.3160 miamidade.gov ' CERT. NO: 1737 October 31,2011 APPS Date: 10/31/2011 -CBE Tier 1 Expiration Date: 10/31/2014 Mr. Samuel Nth ANNUAL ANNNERSARY: 10/31/2012 I • NIFAI-IAND PARTNERS CONSULTING ENGINEERS, INC. 8785 SW 165th Me,Suite 108 Miami, FL 33193-0000 IDear Mr.Nifah: Small Business Development (SBD), a ditis%on of Sus-teirmbiQy, Pining and Economic Enhancement I Department (SPEED) has completed the review of yotr application and attachments submitted for certification.Your firm is officially certified as a Community Business Enterprise(CBE) in accordance with section 2-10.4.01 of the Code of Miami Dade County. . I This certification Is wild for three years provided them are no changes rendering your firm ineligible for certification. You are required to submit a°Continuing Eligibility Afidavit° annually with specific supporting documents on or before your Annhersary Date as fisted above.You will be notified in advance of your fine's Anrater;ary Data Failure to comply with the said responsibilities may result in Immediate action to I decertify your firm. Every three years you will receive a MID recertification review that may include an onsite Investigation; SBD will also notify you accordingly. If at any time axing the certification period"there is a material change in your firm,including.but not limited to ownership, oNcers, Director, scope of vcrk being performed, daily operations, affiliations with other business (es) or physical location et the firm, you must notify this office in smiting within (30) days. Notification should Include supporting documentation.You will recehe timely instructions from this office as to how you should proceed,If necessary. . I Your company is certified in the following categories as listed below,affording you the opportunity to bid and participate on contracts with small business measures. Please note that the categories listed are very general and are used only to assist our customers in searching the directory for certified firms to meet emtraet needs. The threctory for all certified firms can be accessed on the Miami-Dade Curdy SPEED website httirJ/www.mismiclade.gmisba. Thank you for doing business with Miami Dade County. array, l S - . rift •I1 :r 1 ' os • mess Op,. , 'ty Support Semites _ I Small Busi : De _opment D'nision stainability, • :, nirg and Economic Enhancement Department I CATEGORIES:(Your firm may bid or participate on contracts only under these categories) . IRANSPoRTAIIDN PUV.HING-AVWAIWORT MASIER PLAN(CBE) MASS-MAMMY FEASIBILITY&1ECHNICAL STUDas(CSE) ICHWAY SYSTEMS-SITE DEVELOP/PARKING LOTDESIGN(CBE) HIGHWAY SYSTEMS-HIGHWAY DESIGN(CBE) . .. IHIGHWAY SYSIBMS-BRIDGE DESIGN(CSE) J- .r _ .. . aerdsmrmrima' " 0 " J Bonfill&Associates ' • RFO#12-04-02 Page 137 1 e Mr.Milch - " NFAH AND PARTNERS CONSULTING ENGINEERS, INC. October 31,2011 CATEGORES:(Your firm may bid or participate on contracts only Lader these categories) _ AVIATION wisTEMSRJGINEERING DESIGN(CBE) PORT&WAT=.3Wi AY SYSTEMS-ENGLrEERLVG DESIGN(CBE) W S S SEWER SYS-WATER UST&SANITARY SEWAGE COLL(CBE) W&S SEWER SYS-MAJOR WATER&SEWER PUMPING FAC=T(CSE) GENERAL STRUCTURAL ENGINEERING(CSE) GENERAL CNA-ENGINEERING(CBE) " ENGINEERING CONSTRUCTION MANAGEMENT(CBE) VALUE ANA LYSISAIFECYCLE COSTING-AVIATION SYSTEMS(CBE) VAUE ANALYSISAIFELVCLE COSTINsaN STRUCTURAL(CBE) VALUE ANALYSIS/LIFE-CYCLE COSTLYG-GEN QVL RIG(CBE) MASS 1TLVJSTTGENERAL QUALM ENGINEERING(CSE) ENGTEERPIG SERVICES(CBE) c: Karla Ucona, Certification Specialist Veronica Clark,SPEED, SBD 1 • • • 1 - - 1 1 1 1 DEPAWD N.CI,IO26 1 1 I I I I I I I I. I i I I I I I I I I i