Loading...
HomeMy WebLinkAboutZoning Resolution 16-Z-158 RESOLUTION NO. 16-Z - 15$ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, ("CITY") APPROVING A SITE PLAN MODIFICATION APPLICATION SUBMITTED BY LA PLAYA BEACH ASSOCIATES, LLC (THE "APPLICANT") FOR TWO 56-STORY CONDOMINIUM BUILDINGS, 649 FEET IN HEIGHT WITH 490 CONDOMINIUM UNITS, 12 CABANAS, 7,181 SQUARE FEET OF RESTAURANT SPACE, 7,780 SQUARE FEET OF OFFICE SPACE AND 1,850 SQUARE FEET OF RETAIL SPACE WITH A TOTAL FLOOR AREA RATIO (FAR) OF 1,228,154 SQUARE FEET; PROVIDING THE CITY MANAGER WITH THE AUTHORITY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR SEVERABILITY; PROVIDING FOR REPEALER; PROVIDING FOR AN EFFECTIVE DATE. I. RECITALS WHEREAS, the Applicant La Playa Beach Associates. LLC (the "Applicant") is applying for a modification of the approved site plan under Resolution No. 15-Z-156, adopted on November 19, 2015, and has submitted a site plan modification application (Application No. PZ2016-03) to the City of Sunny Isles Beach. Florida requesting the following: 1. Pursuant to Section 265-18 of the City of Sunny Isles Beach Land Development Regulations, the Applicant is requesting. a site plan modification to an approved site plan under Resolution No. 15-Z-156, adopted November 19, 2015. - Legal Description: All of Tract "I", less the South 216.66 feet as measured at right angles to the South line of said Tract "I". of AMENDED PLAT NORTH BISCAYNE BEACH. according to the plat thereof, as recorded in Plat Book 44. at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH • That parcel of land lying East of and bounded on the West by the East line of said Tract "I", and bounded on the North by the Easterly extension of the North line of said Tract "I", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County. Florida,and bounded on the South by the Easterly extension of the North line of the South 216.66 feet, as measured at right angles to the South line of said Tract "I" of AMENDED PLAT NORTH BISCAYNE BEACH I6-Z-_ La Playa Beach Associates, LLC 1 AND The South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH That parcel of land lying East of and bounded on the West by the East line of said Tract "H",and bounded on the North by the Easterly extension of the North line of said South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County, Florida, and bounded on the South by the Easterly extension of the South line of said Tract "H" of AMENDED PLAT NORTH BISCAYNE BEACH. ADDRESS: 188W Collins Avenue, Sunny Isles Beach, FL 33160 FOLIO: 31-2202-003-0120 WHEREAS, on April 21, 2016. the City Commission conducted a public hearing on this site plan modification application; and WHEREAS, the public hearing of the City Commission was advertised and held as required by law, all interested parties concerned in the matter were heard, and due and proper consideration was given to the matter and to the positive recommendation contained in the City's Community Development Department Review Report; and WHEREAS, notice was provided to all interested parties regarding the site plan modification application; and WHEREAS, the City Commission reviewed the site plan modification application, the written and oral recommendations of the Zoning Administrator of the Community Development Department, including the recommended conditions, and finds substantial competent evidence to support a showing by the Applicant that the request for site plan modification is in compliance with the Land Development Regulations and the Comprehensive Master Plan of the City and maintains the basic intent and purpose of the zoning, subdivision or other land use regulations, which is to protect the general welfare of the public, particularly as it affects the stability and appearance of the community; and, further finds that said request should be granted, subject to the conditions described herein. I6-Z- La Playa Beach Associates, LLC 2 NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: 11. INCORPORATION OF RECITALS All recitals above are incorporated into the body of this Resolution as if same were fully set forth herein. III. FINDINGS AND CONCLUSIONS: Based on an analysis of the application and the standards for approval for a site plan modification under the Land Development Regulations, the City Commission makes the following_findings and conclusions: A. The Applicant's request for site plan modification is consistent with the Comprehensive Plan and Land Development Regulations of the City of Sunny Isles Beach. IV. APPROVAL A. The Applicant's request for a site plan modification of the approved site plan under Resolution No. 15-Z-156, adopted on November 19, 2015, is hereby approved subject to all conditions set forth in Section V below. The site plan approval under Resolution No. 15-Z-156 is deemed modified by the plans set forth in Condition No. I in Section V below. V. CONDITIONS Conditions to be completed before demolition, below grade or building permits are issued. 1. That the plans in the approval be substantially in accordance with that submitted for public hearing, which are entitled "Varadero", prepared by ODP Architects stamped received March 30. 2016 consisting of 23 sheets, landscaping plans prepared by West 8/Rosenberg Gardner Design consisting of 10 sheets stamped received March 30. 2016, civil plans prepared by VSN Engineering stamped received March 30, 2016 consisting of 21 pages and the Survey entitled ALTA/ACSM Land Title Survey prepared by Fortin. Leavy, Skiles. Inc. consisting of one sheet dated on September 22, 2014 (Replotted 10/30/15). 2. All conditions enumerated under Resolution No. 15-Z-156 shall remain in effect, as applicable. 3. Upon the submittal of an application for a building permit, the plans submitted shall be approved by the Community Development Department and be consistent with the specific site plan approved by the City Commission. Plans shall include all the required elements of the site plan pursuant to the City's Land Development Regulations and recommendations. Should compliance with recommendations result in a change that would not be considered "minor" in accordance with Section 265-18 of the City Code; the 16-Z-_ La Playa Beach Associates. LLC 3 Applicant shall be required to obtain another approval of the City Commission. 4. That the Applicant shall address comments provided by City's Traffic Consultant regarding traffic and pedestrian crossing analysis. The City Manager or his designee shall review and provide additional comments if necessary. 5. That the Applicant shall address comments provided by the City's Civil Engineer regarding civil plans submitted during the site plan review process. The City Manager or his designee shall review and provide additional comments if necessary. 6. That if the Applicant chooses to propose an artwork prior to building permitting, the Applicant is not required to submit the remainder monetary contribution to meet the minimum monetary requirement. Any artwork must be presented and approved by the City Commission and already made deposits are not refundable nor credited. 7. That the Applicant shall address comments provided by the City's Civil Engineer regarding civil plans submitted during site plan review process. The City Manager or his designee shall review and provide additional comments if necessary. 8. That the Applicant is required to provide a Declaration of Restrictive Covenants for the restrictions to (1) cabana ownership is restricted to condominium owners within the approved development project; and (2) the commercial spaces within the project is to be restricted to one (1) corporate entity under one (1) form of ownership. The Applicant shall submit a Declaration of Restrictive Covenants in a form acceptable to the City Attorney. The Declaration of Restrictive Covenant shall be recorded in the public records of Miami- Dade County at the Applicant's expense. Conditions to be completed before any Certificate of Occupancy is issued: 9. Under Section 267-4, the City Manager and/or his/her designee in review of any application, may refer any such application presented to it to such engineering, planning, legal, technical, or environmental consultant or professional(s)employed by the City as the Manager shall deem reasonably necessary to enable him/her to review such application as required by law. Charges made by such consultants or professionals shall be in accord with the charges customarily made for such services in Miami-Dade County, and pursuant to an existing contractual agreement by and between the City and such consultant. Charges made by the City shall be in accord with the hourly rates charged by such consultants or hourly rates of employed professionals and shall be paid within 30 days on submission of City voucher. 10. At the time of submission of any application or thereafter, it is required that an escrow account be established, from which withdrawals shall be made to reimburse the City for the cost of professional review services, if any. The Applicant shall then provide funds to the City for deposit into such account in an amount to be determined by the City Manager, based on his/her evaluation of the nature and complexity of the application. The Applicant shall be provided with copies of any City voucher for such services as they are submitted to the City. When the balance in such escrow is reduced to one-third (1/3) of its initial I6-Z-_ La Maya Beach Associates, LLC 4 amount, the applicant shall deposit additional funds into such account to bring its balance up to the amount of the initial deposit. If such account is not replenished within thirty-days (30) after the applicant is notified, in writing, of the requirements for such additional deposit_ the City may suspend its review of the application. An application shall be deemed incomplete if any amount shall be outstanding. A building permit or Certificate of Use and Certificate of Occupancy shall not be issued unless all professional review fees charged in connection with the applicant's project have been reimbursed to the City. Once all pertinent charges have been paid; the City shall refund to the Applicant any funds remaining on deposit. 11. The Applicant shall furnish payment and performance bond in an amount determined by the Building Official to ensure Applicant's performance of public improvements required pursuant to site plan approval and in accordance with recommendations of the Building Official after review of construction plans submitted based on development approval granted herein. Any such bond shall be issued by a surety having a minimum rating of A- 1 in the Best's Key Rating Guide, Property/Casualty Edition, shall be subject to the approval of the City, and shall provide that "this bond may not be cancelled or allowed to lapse until 30 days after receipt by the City, by certified mail, return receipt requested, of written notice from the issuer of the bond of intent to cancel or not to renew". As improvements are made the City, within its discretion, may reduce or eliminate the bond amount. These rights reserved by the City with respect to any construction bond established pursuant to this section are in addition to all other rights and remedies the City may have under this Resolution, in law or in equity. Other Conditions 12. That the Applicant obtains a Certificate of Occupancy and a Certificate of Use from the City upon compliance with all terms and conditions. The Certificate of Occupancy and Certificate of Use shall be subject to cancellation upon violation of any of the conditions. 13. That the approved site plan shall remain valid for a period of 72-months from the date of the site plan modification approval. If no building permit is issued within the 72-month time period, the site plan shall be considered null and void and of no force and effect. 14. That the Applicant complies with all City Ordinances, County, State and Federal Laws and Regulations applicable to development and permit approvals. 15. All sand excavated from the property including sand from the western side of the Coastal Construction Control Line ("CCCL") shall be cleaned and shall remain on the beach for re-nourishment purposes in a location to be determined by Miami-Dade County Regulatory and Economic Resources ("RER") (formerly Miami-Dade County Department of Environmental Resources Management "DERIM"). NO BUILDING PERMIT SHALL BE ISSUED UNLESS THE APPLICANT HAS SUBMITTED ALL DOCUMENTS REFERRED TO UNDER THIS RESOLUTION AND SHALL HAVE PAID ALL IMPACT FEES, BONUSES AND PROFESSIONAL FEES (AS 16-Z- La Playa Beach Associates. LLC j PER SECTION 267-4 OF THE CODE OF THE CITY OF SUNNY ISLES BEACH) AND ALL OTHER FEES DUE AND OWING PURSUANT TO THE APPLICABLE LAND DEVELOPMENT REGULATIONS, AND SHALL HAVE SUBMITTED PAYMENT TO THE CITY FOR ALL TRANSFER OF DEVELOPMENT RIGHTS (IF APPLICABLE), OR SHALL HAVE OTHERWISE PRODUCED EVIDENCE THAT THE PERMITTED PRIVATE DEVELOPMENT RIGHTS AS SET FORTH IN SECTION IV HEREINABOVE HAVE BEEN TRANSFERRED. FAILURE BY THE CITY TO TIMELY ENFORCE ANY OF THE ABOVE CONDITIONS DOES NOT CONSTITUTE A WAIVER OF THE SAME AND IF THE APPLICANT, ITS SUCCESSORS, OR, ASSIGNS, DOES NOT PERFORM SUCH CONDITIONS WITHIN FIVE (5) DAYS AFTER WRITTEN NOTICE, THE CITY RETAINS THE RIGHT TO STOP CONSTRUCTION, IF NECESSARY, UNTIL THAT CONDITION IS MET. BY ACTING UNDER THIS APPROVAL, APPLICANT HEREBY CONSENTS TO ALL THESE TERMS AND CONDITIONS. VI. AUTHORIZATION OF CITY MANAGER The City Manager is hereby authorized to do all thines necessary to effectuate this Resolution. VII. SEVERABILITY If any section, subsection, sentence, clause, phrase. or portion of this Resolution is, for any reason, held invalid or unconstitutional by any Court of competent jurisdiction, such portion shall be deemed a separate,distinct,and independent provision and such holding shall not affect the validity of the remaining portions of this Resolution. VIII. REPEALER All Resolutions are parts of Resolutions in conflict herewith shall be hereby and are repealed. IX. EFFECTIVE DATE This Resolution shall become effective upon adoption. PASSED and ADOPTED this 21' day of April, 2016. CITY OF SUNK ISLES BEACH, FLORIDA By its Ci ''Commission By: George . Scholl. Mayor 16-Z-_ La Playa Beach Associates, LLC 6 r" • ATTEST. LALL9.43 It Jane A. Hines. MMC. City Clerk APPROVED TO FORA? AN pa' H. s •'not. City Attorney Moved by: CO t .l._tOt.] Second by: 0.ph�h L£ I tO VOTE: S —0 Mayor Scholl tees no Vice Mayor Gatto -es no Commissioner Aelion y4es no Commissioner Goldman 'yes no Commissioner Levin V yes no 16-Z-_ La Playa Beach Associates. LLC 7 STATE OF FLORIDA ) ) ss: COUNTY OF MIAMI-DADE ) I, JANE A. HINES, Clerk of the City of Sunny Isles Beach, Florida, do hereby certify that the above and foregoing is a true and correct copy of Resolution No. 16-Z- LSe adopted by the City Commission at its meeting. held on the 21" day of April, 2016. Issued this 34 day of M CLI . 2016. ,: Jane A. Hines, MMC, City Clerk . I6-Z-_ La Playa Beach Associates. LLC 8 Item Coversheet Page 1 of I ,' "!r City of Sunny Isles Beach 0; b 18070 Collins Avenue r.( r I. Sunny Isles Beach, Florida 33160 zee (305)947-0606 City Han Yi=• o.., (305)949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J.Russo,City Manager FROM: Claudia Hasbun,AICP,Zoning Administrator/Planning Manager DATE: 4/21/2016 Varadero-La Playa Beach Associates,LLC. RE: Modification to an Approved Site Plan 18801 Collins Avenue Appl. No. PZ2016-03 RECOMMENDATION: Based on the above review by City's Staff and City's Consultants, the application is consistent with the City's Comprehensive Plan and Land Development Regulations. The site plan modification is a reduction of density, specifically though the elimination of the hotel and apartment- hotel component. The density reduction reduces the number of parking spaces required for the project.Additionally, there are ancillary uses requested such as a commercial office space and cabanas. Since the density has been reduced these additional uses are in compliance with parking requirements. The Applicant is not requesting any variances. Staff has reviewed the site plan modification application and is submitting this application with conditions for your consideration. REASONS: The Applicant is seeking approval of a modification to a previously approved site plan for two 56-story towers 649 feet in height with 490 condominium units, 12 cabanas, 7,181 square feet of restaurant space, 7,780 square feet of office space and 1,850 square feet of retail space with a total floor area ratio(FAR)of 1,228,154 square feet. ATTACHMENTS: Description Zoning Notice Staff Report Public Hearing Application Letter of Intent Letter of Intent First Amended Item Number:6.A. http://sunnvisles.novusaeenda.cool/AeendaWeb/CoverSheet.aspx?ItemID=1877 4/14/2016 CITY OF SUNNY ISLES BEACH s NOTICE OF ZONING HEARING NOTICE IS HEREBY GIVEN that a public hearing will be held by the City Commission of the City of Sunny Isles Beach. Florida, in the David P. Samson Commission Chambers, Sunny Isles Beach Government Center, 18070 Collins Avenue, Sunny Isles Beach, Florida on Thursday, April 21, 2016 at 6:30 p.m., to consider the following Zoning application: Application: La Playa Beach Associates, LLC (Applicant) Project Name: Varadero — Site Plan Modification Location: 18801 Collins Avenue Public Hearing #: PZ2016-03 Summary: The Applicant is seeking approval of a site plan modification. The Applicant obtained an approved site plan pursuant to Resolution No. 15-Z-156, adopted on November 19, 2015. The site plan modification consists of two 56-story condominium buildings, 649 feet in height with 490 condominium units, 12 cabanas, 7,181 square feet of restaurant space, 7,780 square feet of office space and 1,850 square feet of retail space with a total floor area ratio (FAR) of 1,228,154 square feet. Request: 1. Pursuant to Section 265-18 of the City of Sunny Isles Beach Land Development Regulations, the Applicant is requesting a site plan modification to modify a previously approved site plan under Resolution No. 15-Z-156, adopted November 19, 2015. The plans reviewed are on file, and may be examined, in the City Clerk's Office and are entitled "Varadero", prepared by ODP Architects stamped received March 30, 2016 consisting of 23 sheets, landscaping plans prepared by West 8/Rosenberg Gardner Design consisting of 10 sheets stamped received March 30, 2016, civil plans prepared by VSN Engineering stamped received March 30, 2016 consisting of 21 pages and the Survey entitled ALTA/ACSM Land Title Survey prepared by Fortin. Leavy, Skiles, Inc. consisting of one sheet dated on September 22, 2014 (Replotted 10/30/15). Plans are subject to revisions based comments provided by zoning staff of the City of Sunny Isles Beach. Plans are subject to modification. Legal: All of Tract "I", less the South 216.66 feet as measured at right angles to the South line of said Tract "I". of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH: That parcel of land lying East of and bounded on the West by the East line of said Tract "I", and bounded on the North by the Easterly extension of the North line of said Tract "I", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County, Florida, and bounded on the South by the Easterly extension of the North line of the South 216.66 feet, as measured at right angles to the South line of said Tract "1"of AMENDED PLAT NORTH BISCAYNE BEACH AND The South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44. at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH: That parcel of land lying East of and bounded on the West by the East line of said Tract "H", and bounded on the North by the Easterly extension of the North line of said South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County, Florida, and bounded on the South by the Easterly extension of the South line of said Tract "H" of AMENDED PLAT NORTH BISCAYNE BEACH. Size of Property: 4.716 acres (205,424 sq. ft.) Zone: Mixed Use Resort District All persons are invited to appear at this meeting or be represented by an agent, or to express their views in writing addressed to the City Clerk, City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida, 33160. The courts have ruled that it is improper to contact a City Commission member individually, either orally or in writing about any zoning applications. Maps and other data pertaining to these applications are available for public inspection during normal business hours in City Hall. Any zoning hearing may be continued at this meeting and under such circumstances, additional legal notice would not be provided. Any persons wishing to speak at a public hearing should register with the City Clerk prior to that item being heard. Inquiries regarding the item may be directed to the City Clerk at(305) 792-1703. Please refer to the hearing number when making an inquiry. If a person decides to appeal any decision made by the City Commission with respect to any matter considered at such meeting or hearing, they will need a record of the proceedings and, for such purpose, may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. This notice does not constitute consent by the City for introduction or admission of otherwise inadmissible or irrelevant evidence, nor does it authorize challenges or appeals not otherwise allowed by law. In accordance with the Americans with Disabilities Act, all persons who are disabled and who need special accommodations to participate in this meeting because of that disability should contact the City Manager at 305-792-1701, no later than 48 hours prior to the proceeding. NY`if[ E x 0 i.RE l LOPLO .‘Sr • itr or sum r.NO CITY OF SUNNY ISLES BEACH DEVELOPMENT REVIEW REPORT VARADERO SITE PLAN MODIFICATION I. PROJECT SUMMARY Application Number: PZ2016-03 Application Summary: The Applicant is seeking approval of a site plan modification. The Applicant obtained a site plan approval pursuant to Resolution No. 15- Z-156, adopted on November 19, 2015. The site plan modification consists of two 56-story condominium buildings, 649 feet in height with 490 condominium units, 12 cabanas, 7,181 square feet of restaurant space, 7,780 square feet of office space and 1,850 square feet of retail space with a total floor area ratio (FAR) of 1,228,154 square feet. Applicant/Owner: La Playa Beach Associates, LLC 1300 Brickell Avenue Miami, FL 33131 II. SITE INFORMATION Land Area: 4.716 Acres (205,424 sq. ft.) (Survey updated 9/22/14) Location: 18801 Collins Avenue Folio: 31-2202-003-0120 Legal Description: All of Tract "1", less the South 216.66 feet as measured at right angles to the South line of said Tract "I", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat I U:\PLANNING&ZONING20031ZONING HEARING-APPLICAT1ONS\2016 APPLICATION\PZ2016-03 Varadero Mod.Staff Report 042116 Book 44, at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH That parcel of land lying East of and bounded on the West by the East line of said Tract "I", and bounded on the North by the Easterly extension of the North line of said Tract "I", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County, Florida, and bounded on the South by the Easterly extension of the North line of the South 216.66 feet, as measured at right angles to the South line of said Tract "I" of AMENDED PLAT NORTH BISCAYNE BEACH AND The South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH That parcel of land lying East of and bounded on the West by the East line of said Tract "H", and bounded on the North by the Easterly extension of the North line of said South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County, Florida, and bounded on the South by the Easterly extension of the South line of said Tract "H" of AMENDED PLAT NORTH BISCAYNE BEACH. Land Use: Mixed Use - High Density Resort (MUHDR) This category is intended to provide for resort style developments (hotels, hotel-apartments and resorts), high quality residential apartments (as-of-right 50 DUs/acre and 2.5 F.A.R.) and associated internal accessory uses (restaurants and other convenience services). Residential densities with bonuses may not exceed eighty (80) units per acre for apartments. The density may be increased by the utilization of TDRs. Zoning: Mixed Use Resort (MU-R) This district provides for multifamily dwellings at a maximum density of 80 dwelling units per acre for condominiums and 125 dwelling units for apartment/hotel. Apartments, hotels, motels and apartment-hotels, commercial services and retails goods internal to the buildings and U:WLANNING&ZONIYG200SIZOSING HEART\G-APPLICATIO\SL016 APPLICATIONWZ201603 Varadero Mod.Staff Report 042116 conference facilities are permitted uses. The density may be increased by the utilization of TDRs. History: The subject property is known as La Playa Varadero Motel Condominium. This property was developed in 1963 as a motel and was converted into a Motel Condominium with a total of 349 units. This property was one of the few remaining two-story motels in the City but has been demolished by its current owners. On November 19, 2015, the Applicant received approval of a site plan for two 56-story towers consisting of 431 residential condominiums, 60 hotel units and 90 apartment-hotel units and 1,228,435 square feet of floor area ratio (FAR) under Resolution 15-Z-156. Adjacent Properties: Existing Use Zoning Land Use Plan North Ocean III MU-R MU-HDR East Atlantic Ocean -- South Marenas Resort MU-R MU-HDR West Millenium Plaza 8-1 N-B III. REQUEST 1. Pursuant to Section 265-18 of the City of Sunny Isles Beach Land Development Regulations, the Applicant is requesting a site plan modification to an approved site plan under Resolution No. 15-Z-156, adopted November 19, 2015. IV. ZONING REVIEW The plans reviewed are on file, and may be examined, in the City Clerk's Office and are entitled "Varadero", prepared by ODP Architects stamped received March 30, 2016 consisting of 23 sheets, landscaping plans prepared by West 8/Rosenberg Gardner Design consisting of 10 sheets stamped received March 30, 2016, civil plans prepared by VSN Engineering stamped received March 30, 2016 consisting of 21 pages and the Survey entitled ALTA/ACSM Land Title Survey prepared by Fortin, Leavy, Skiles, Inc. consisting of one sheet dated on September 22, 2014 (Replotted 10/30/15). Plans are subject to revisions based comments provided by zoning staff of the City of Sunny Isles Beach. Plans are subject to modification. 1. 265-35.D (1) Minimum Lot Area and Width: No modification requested. 2. 265-35.D (2) & 265-23 (2) (f) Maximum Height: No modification requested. 3. 265-35 D (3) Lot Coverage: No modification requested. U1PLANNING&ZONING2003\ZONING 11EARING-APPLICATIONSH016 APPLICATION\PZ2016-03 Varadero Mod.Staff Report 042116 4. 265-35.D(4):Setbacks: Required I Provided Front Tower 75 feet 147 feet 5 inches Complies. Porte Cochere 50 feet 75 feet 0 inches Complies. Pedestal 10 feet 17 feet 5 inches (Subterranean) Complies. Rear Bulkhead line or 20 feet from the 130 feet 0 inches rear property line, whichever is (Tower) Complies. closer to Collins Ave. 130 feet 0 inches (Porte Cochere) Complies. 46 feet 0 inches (Pedestal) Complies. Side North Tower 50 feet or 25 feet if apply for 25 feet. Complies. Design Flexibility. Pedestal Three-foot setback for each two 25 feet. Complies. feet of building height up to a maximum setback of 20 feet. Pedestal 0 feet (property line) Property line. (Subterranean) Complies. Side South Tower 50 feet or 25 feet if apply for 25 feet. Complies. Design Flexibility. Pedestal Three-foot setback for each two 25 feet 0 inches. feet of building height up to a Complies. maximum setback of 20 feet. Pedestal 0 feet (property line) Property line. (Subterranean) Complies. 5. 265-35. D (5) Minimum separation between building: No modification requested. 6. 265-35. D (6) Maximum Building Width: No modification requested. 7. 265-35.D (8) Beach Access Easement: No modification requested. 8. 265-35.D (9) Floor Area Ratio: Complies. Maximum floor area ratio (265-35.D(9)(b)): 4 U:\PLANNING&ZONING2003\ZONING HEARING-APPLICATIONS\2016 APPLICATION\PZ2016-03 Varadero Mod.Staff Report 042116 Permitted: Base 2.50 (513,572 square feet); with FAR Bonus and TDRs 5.98— (1,228,435 square feet). Provided: 5.98 with bonus FAR and TDRs — 1,228,154 square feet. 9. 265-35.D (10) (e) Maximum Dwelling Unit Density Bonuses: Complies. (a) Apartment (Condominium) — 4.716 acres Allowed: 50 dwelling units/acre (Base number); plus 30 dwelling units/acre (Bonus number); and 30% increase from Base plus Bonus 24 dwelling units/acre (TDRs). Max. 80 dwelling units/acres plus TDRs. 377 dwelling units (Base and Bonus); 113 dwelling units (TDRs) Provided: 490 dwelling units. (b) Tower One consists of 390 Condominium units. (c) Tower Two consists of 100 Condominium units. 10. 265-35.D (11) Minimum Unit Size: Complies. Required: 550 square feet (apartments) Provided: Condominium unit sizes: Average of 2,231 square feet (smallest unit is 805 square feet and the largest unit is 11 ,408 square feet.) 11. 265-35.D (13) Parking Garage/rooftop: Complies. Allowed: 5% Maximum (48 spaces) Provided: 1 H/C parking space 12. 265-35 (15) Open Space: No modification requested. 13. 265-46 Parking: Required Provided Comments (Residential) 884 884 Complies. Condominium Parking Spaces Parking spaces (Commercial) Restaurant 48 spaces 48 spaces Complies. Office 26 spaces 26 spaces Complies. Retail 8 spaces 8 spaces Complies. Handicap 22 Spaces 22 Spaces For all uses Per F.S. ch. 553 Complies. pt. V TOTAL 966 Spaces 977 Spaces Regular (*) Tandem Mechanical Loading 2 (10' x 25') 2 (30' x 12') Complies. Spaces 1 (11' x 35') 1 (11' x 35') (') 21 parking spaces out of total are regular spaces. All remaining spaces are valet only spaces, with the exception of the required handicap parking spaces. U:IPLANNING&ZONING20031ZONING HEARING-APPLICATIONS12016 APPLICATIONWZ2016-03 Varadero Mod.Staff Report 042116 14. 265-56(A) Signage: Complies Allowed: Two (2) Max. 78 square feet (monument) Provided: Two (2) max. 78 square feet monument signs. Signage details to be submitted at Building permitting. 15. 104-4.2 Art in Public Places. No modification requested. 16. Construction Staging Plan. Complies. Required: Submit a proposal for construction staging. Provided: Submitted as a separate document, dated March 30, 2016. V. PLANNING REVIEW: 1. Comprehensive Plan The proposed development is consistent with the Goals, Objectives and policies of the City of Sunny Isles Beach Comprehensive Plan. 2. Traffic Engineering Traffic Impact Study: The Applicant submitted a traffic report dated March 4, 2016 prepared by Juan Espinosa PE from David Plummer & Associates, Inc. The report has been reviewed by the City's -Consultant Salman Rathore, PE from The Corradino Group. The Consultant provided comments on March 11 , 2016 which stated that the development size is smaller and the trips generated by the revised project is less as compared to the previous study. The City's Consultant has approved the submitted plans subject to compliance with Condition #4 in this report, to conduct a Pedestrian Crosswalk Warrant Analysis. 4. Landscaping Architect The Applicant's Landscaping Plans were prepared by West8/Rosenberg Garden Design dated March 30, 2016 and have been reviewed by City's Landscape Consultant Kathy O'Leary Richards, PLA, ASLA, LEED GA from O'Leary Richards Design Associates, Inc. dated November 6, 2015. The City's Consultant has approved the submitted plans. 5. Civil Engineering Civil Engineering comments must be addressed during building permitting process. The City's Consultant, The Corradino Group, has approved the submitted plans subject to compliance with Condition #7. 6 U:\PLANNING&ZONING200S\ZONING HEARING-APPLICATIONS\2016 APPLICATION\PZ2016-03 Varadero Mod.Staff Report 042116 VI. FINAL ANALYSIS Based on the above review by City's Staff and City's Consultants, the application is consistent with the City's Comprehensive Plan and Land Development Regulations. The site plan modification is a reduction of density, specifically though the elimination of the hotel and apartment-hotel component. The density reduction reduces the number of parking spaces required for the project. Additionally, there are ancillary uses requested such as a commercial office space and cabanas. Since the density has been reduced these additional uses are in compliance with parking requirements. The Applicant is not requesting any variances. Staff has reviewed the site plan modification application and is submitting this application with conditions for your consideration. VII. CONDITIONS • If the City approves this application, the application will be subject to the following conditions set forth in Section VII. Conditions to be completed before demolition, below grade or building permits are issued. 1. That the plans in the approval be substantially in accordance with that submitted for public hearing, which are entitled "Varadero", prepared by ODP Architects stamped received March 30, 2016 consisting of 23 sheets, landscaping plans prepared by West 8/Rosenberg Gardner Design consisting of 10 sheets stamped received March 30, 2016, civil plans prepared by VSN Engineering stamped received March 30, 2016 consisting of 21 pages and the Survey entitled ALTA/ACSM Land Title Survey prepared by Fortin, Leavy, Skiles, Inc. consisting of one sheet dated on September 22, 2014 (Replotted 10/30/15). Plans are subject to revisions based comments provided by zoning staff of the City of Sunny Isles Beach. Plans are subject to modification. 2. All conditions enumerated under Resolution No. 15-Z-156 shall remain in effect, as applicable. 3. Upon the submittal of an application for a building permit, the plans submitted shall be approved by the Community Development Department and be consistent with the specific site plan approved by the City Commission. Plans shall include all the required elements of the site plan pursuant to the City's Land Development Regulations and recommendations. Should compliance with recommendations result in a change that would not be considered "minor" in accordance with Section 265-18 of the City Code; the Applicant shall be required to obtain another approval of the City Commission. 4. That the Applicant shall address comments provided by City's Traffic Consultant regarding Traffic and pedestrian crossing analysis. The City Manager or his designee shall review and provide additional comments if necessary. 7 UiPLANN ING&ZONING200312ONING HEARIN'G-APPLICATIONSI2016 APPLICATIONWZ2016-03 Varadero Mod.Staff Report 042116 5. That the Applicant shall address comments provided by City's Civil Engineer regarding civil plans submitted during site plan review process. The City Manager or his designee shall review and provide additional comments if necessary. 6. That if the Applicant chooses to propose an artwork prior to building permitting, the Applicant is not required to submit the remainder monetary contribution to meet the minimum monetary requirement. Any artwork must be presented and approved by the City Commission and already made deposits are not refundable nor credited. 7. That the Applicant shall address comments provided by City's Civil Engineer regarding civil plans submitted during site plan review process. The City Manager or his designee shall review and provide additional comments if necessary. 8. That the Applicant is required to provide a Declaration of Restrictive Covenants for the restrictions to (1) Cabana ownership, cabanas are to be restricted to condominium owners only; and (2) the commercial spaces within the project is to be restricted to one (1) commercial entity under one (1) ownership. The Applicant shall submit a Declaration of Restrictive Covenants in a form acceptable to the City Attorney. The Declaration of Restrictive Covenant shall be recorded in the public records of Miami-Dade County at the Applicant's expense. Conditions to be completed before any Certificate of Occupancy is issued. 9. Under Section 267-4, the City Manager and/or his/her designee in review of any application, may refer any such application presented to it to such engineering, planning, legal, technical, or environmental consultant or professional(s) employed by the City as the Manager shall deem reasonably necessary to enable him/her to review such application as required by law. Charges made by such consultants or professionals shall be in accord with the charges customarily made for such services in Miami-Dade County, and pursuant to an existing contractual agreement by and between the City and such consultant. Charges made by the City shall be in accord with the hourly rates charged by such consultants or hourly rates of employed professionals and shall be paid within 30 days on submission of City voucher. 10. At the time of submission of any application or thereafter, it is required that an escrow account be established, from which withdrawals shall be made to reimburse the City for the cost of professional review services, if any. The Applicant shall then provide funds to the City for deposit into such account in an amount to be determined by the City Manager, based on his/her evaluation of the nature and complexity of the application. The Applicant shall be provided with copies of any City voucher for such services as they are submitted to the City. When the balance in such escrow is reduced to one-third (1/3) of its initial amount, the applicant shall deposit additional funds into such account to bring its balance up to the amount of the initial deposit. If such account is not replenished within thirty-days (30) after the applicant is notified, in writing, of the requirements for such additional deposit, the City may suspend its review of the application. An application shall be deemed incomplete if any amount shall be outstanding. A building permit or Certificate of Use and Certificate of Occupancy shall not be issued unless all professional review fees charged in connection with the applicant's project have been reimbursed to the City. Once all 8 U:\PLANNING&ZONING20081ZONING HEARING-APPLICATIONS\2016 APPLICATION\PZ2016-03 Varadero Mod.Staff Report 042116 pertinent charges have been paid, the City shall refund to the Applicant any funds remaining on deposit. 11. The Applicant shall furnish payment and performance bond in an amount determined by the Building Official to ensure Applicant's performance of public improvements required pursuant to site plan approval and in accordance with recommendations of the Building Official after review of construction plans submitted based on development approval granted herein. Any such bond shall be issued by a surety having a minimum rating of A- 1 in the Best's Key Rating Guide, Property/Casualty Edition, shall be subject to the approval of the City, and shall provide that "this bond may not be cancelled or allowed to lapse until 30 days after receipt by the City, by certified mail, return receipt requested, of written notice from the issuer of the bond of intent to cancel or not to renew". As improvements are made the City, within its discretion, may reduce or eliminate the bond amount. These rights reserved by the City with respect to any construction bond established pursuant to this section are in addition to all other rights and remedies the City may have under this Resolution, in law or in equity. Other Conditions. 12. That the Applicant obtains a Certificate of Occupancy and a Certificate of Use from the City upon compliance with all terms and conditions. The Certificate of Occupancy and Certificate of Use shall be subject to cancellation upon violation of any of the conditions. 13. That the approved site plan shall remain valid for a period of 72-months from the date of the site plan modification approval. If no building permit is issued within the 72-month time period, the site plan shall be considered null and void and of no force and effect. 14. That the Applicant complies with all City Ordinances, County, State and Federal Laws and Regulations applicable to development and permit approvals. 15. All sand excavated from the property including sand from the western side of the Coastal Construction Control Line ("CCCL") shall be cleaned and shall remain on the beach for re- nourishment purposes in a location to be determined by Miami-Dade County Regulatory and Economic Resources ("RER") (formerly Miami-Dade County Department of Environmental Resources Management "DERM"). (END) 9 U:\PLANNING&ZONING20031ZONIN'G HEARING-APPLICATIONS 12016 APPLICATION\PZ2016-03 Varadero Mod.Staff Repon 042116 r.-1 Ro' - Tv`��' . -c'$J yxl A to '£N ''sx�`xy''t ` S.0 4Ih 'h i Str;"i=;�`4. ' f„i5."i V , .�A�.�^. a�'kr L ;% 6,- • netym 6 k.ti+ 73,4? atu mss' •r`"rs m�rE .s f•- ,„,,tr' ;4.4:,ry`t' gf-i 070 C II s.Ave ue fl'. :cy fist'' I . A.`r a `' _i 'ri5 r+r n iyi ' -t8 {t:' -S nn Isles Beach Flondo 331x60` t6`'rs ' '&.r Nr: rMa v� x , a -✓ r "� >lr ,� L+i ) yr- 1 u r � ru SJN Ir<f F �xf.r .. r 3�' xi, z` i. ,, >_ 305947:0606 -twirl `ic "ago'', ,,,,,,ss k t .ate" u,� ''v b T..Jir _ +a s: . '. e NVN/sll)II net 'Y`X'� uI if, March 31, 2016 f� , S '•rtor` s° City Commission - %br SUN Oe George"Bud°Sdtoli Mr.Clifford A.Schulman Mayor Weiss Serota Helfman Cole & Bierman Jeanette Gatto 2525 Pon-Cite Leon BEd.,Suite 700 Vice Mayor Coral Gables, FL 33134 Isaac Aelion Commissioner RE:Varadero Site Plan modification requests Dana Goldman Commissioner Dear Mr.Schulman: Jenniifer.Levin Commissioner As you know, City Staff is reviewing your site plan modification requests for the Varadero project. Your client's requests Include several issues that at this moment will Christopher J.Russo �.:..,.., ., ay Manager need additional'time fol Staff to research arid`su'bmit the proper recommendation. As Hans Ottinot you may know,the City Code requires Staff to conduct a financial analysis before ayAttorey recommending any-payment extension for TDRs and bonuses. I am proposing that the Jane A. Hines site plan modification application includes only the following Items: ay Clerk,MMC o To allow for 490 residential units where 431 were approved o To delete 60 hotel units and 90 apartment hotel units as were previously approved o To allow for 12 cabana/suites o To allow for 7,181 square foot of restaurant space,7,780 square feet of office space and 1,850 square feet ofretail space The other issues raised in your Letter of Intent will be presented to the City Commission at a later time: o To allow for modification of the TDRs request approved under Condition 17 of Resolution No. 15-Z-156 . o To allow for the modification of Resolution No. 2015-2497(TDRs Resolution) o To allow for.the Incremental payment of fees for building permits and bonuses and TDRs based on each Phase of construction of the project Please advise if you want the site plan process to continue accordingly.Should you have any question, please feel free to contact me at(305)792-1757. Sincere u.. asbun,AICP Zoning Administrator/Planning Manager - Page 1 of 2 Varadero Modification PZ2016-03 March 31,2016 . , ,-C-4,..,...".:4,4 ,. fl,al*--•Ti-- Agc-----..---:'4,:t" ' '0?;;;',C'''*-fe ...1i 14-;Y.."'''''''''''eke 4-'4'0. 1.1144-'N Zatit'‘..z•-erv7.- til>,,..---:.••%:. ..tt.w.t\-..,a,ak,.-V-,,,„“:,.;?,.- 1,34,-3/4 14“.i, 74 C; eVi;kiatt--414;'::C.-SC IO v.:cf 't tvr;ri:.:447,21,1,441:,' i*CL:ItY,V.16,?Irf Wan{4,F.0--i"7_it 1".141;11ffek 1"/4"."la .11v4,-,t-fil? .1,14,1f4n4j16:4114.< ,; ,....14:41.;:1_,;4 1:* i..1e'11,-,r.'t .-141-'-. e:: : i,-a-.111-11 4.:;i:-'.i 1.C''17.-71i1.-41- N.13'1: -4,-- -^nr.' .."-k".• .Z.a•-t:-'sr rag;,..--- 'a — t--1.. .-11-1- ..-4:1".. sAr:411,,,,..!- -:1141111.44'1'4'.."7:/- NI'kg.'-'21‘1T ki,..t.Z-Ifrtt'-''.4kC:r‘V'L*1‘1'Werf4C.1441.1-1.;ial-firi-t::e'rjhl-;?' 14N ..I'..1 ktle.?44 1 ruze:E.70elif -it,4,-t-C.rt;4,;A:i44.1:4,4,54.77iic ....-..,--i41:h ' 4"`).fge ,,,,:-.4 7:c vri,oe-atil:ts::44. „;.?-,,,:„;:,40,fr-rA„rei3k4.,,,,11 it ,. ioi.L..L. .,, ,...:,7„..2).,..24„....o.i..„,;„:,..;!..L.44..,..,,, ...-- E-21-TArtr,,,,.4 tr.., _a.4 rtj kepe-wt.ea: ,,,Api,mdtarawOre..,:'-r---t ..... .. _ _ _ ,_ - • 4e • CC:"Christo-phei Russo;City Manager „ co).O'i tri4, StanVOrris,-Deputy City Manage 'r Hans Ottinot, City Attoiney • Sylvia Miller, Planning and Zoning Technician • • Alek ArDaViel,A1CP;Bell'DaVid*Planding Gfoub Chad Friedrifan,WSFICEI ., Celina M.-Vazgyez,.Fortune International Esteban Koffsrhan, Chateau Group - - ._ Edward O'Donnell, O'Donnell Dannwolf&Partners Architects, INC Catalin Dobre, O'Donnell Dannwolf& Partners Architects, INC. • . . • • - • _ - . ' - . • _ . -. --- Page 2 of 2 Varadero Modification . PZ2016-03 March 31,2016 4°NNr I+ frs PUBLIC HEARING APPLICATION RECEIVED Hearing V Date Re,eived � Folio Number • • • 2016 � . 2016 -03 fII.01 fVM I�° Proposed Project Name: Varadero PLANNING & ZONING DEPT. —My-at-Sunny Isles Beach,FL 2. Name of Applicant La Playa Beach Associates, LLC - a. If applicant is the owner,give name exactly as recorded on deed. b. If applicant is lessee, attach copy of valid lease of one (I)year or more and Property Qwnen_Swom_to:Conse nt. c. If applicant is a corporation,partnership, limited partnership,or trustee,a separate Disclosure of Interest form must be completed. 3. Applicant Mailing Address 1300 Brickell Avenue City Miami State Florida Zip 33131 Tel.#(during working hours) 305-351-1000 Other 4. Name of Property Owner La Playa Beach Associates, LLC Mailing Address 1300 Brickell Avenue City Miami State Florida Zip 33131 Tel.#(during working hours) 305-351-1000 Other 5. Contact Person Chad Friedman Mailing Address 2525 Ponce de Leon Blvd., Suite 700 City Miami State Florida Zip 33134 Tel. #(during working hours) 305-854-0800 Other 4. LEGAL DESCRIPTION OF THE PROPERTY COVERED BY THE APPLICATION a.if subdivided, provide lot,block,complete name of subdivision,plat book and page number. — - - . - - - - - - - - b.if metes and bounds description,provide complete legal description(including section,township and range). c.if separate request apply to different areas,provide the legal description of each area covered by a separate request. d.attach a separate,typed sheet if necessary. Verify the legal description is correct. See Attached. 5. Address or location of subject property: 18801 Collins Avenue Folio No. 31-2202-003-0120 6. Size of property.• 435:81 - ft.z 469:99 ft.acres 4:716 City of Sunny Isles Beach Community Development Department 7. Date subject property acquired or leased❑ 19th day of November, 2014 term of lease years/months. 8. Does property owner own contiguous property to the subject property?If so,give complete legal description of entire contiguous property.(If lengthy, please type on a sheet labeled"Contiguous Property". No. 9. Is there an option to purchase❑orlease 0-the-Subject property or property contiguous thereto? ❑ Yes or X No If yes,who are the potential purchasers or lessees?(Complete section of Disclosure of Interest form also). 10. Present zoning classification(s): MU-R 1 I. REQUEST(S)COVERED UNDER THIS APPLICATION: Please check the appropriate box and give a brief description of the nature of the request in the space provided: o Comprehensive Plan Amendment o District Boundary Change(s) o Site Plan Approval o Conditional Use o Variance o Plat Approval o Transfer Development Rights o Vested Rights -o-Appeals XOther: Major Site Plan Modification 12. Has a public hearing been held on this property within the last year and a half? yes o no If yes,applicants name La Playa Beach Associates, LLC Date of hearing July 16, 2015 and November 19, 2015 Nature of hearing Temporary Sales Center (7/16/15) & Site Plan Approval (11/19/15) Decision of hearing Approved Resolution# 2015-2444 & 15-Z-156 City of Sunny Isles Beach Community Development Department 13. Is this hearing being requested as a result of violation notice?o yes X no If yes, give name to which violation notice was served Nature of violation 14. Are there any existing structures on the property? o yes X no If yes,briefly describe 15. Is there any existing use on the property? ❑ yes rX no If yes,what is the use and when was it established?Use Established N/A City of Sunny Isles Beach Community Development Department OWNERSHIP AFFIDAVIT FOR LIMITED LIABILITY COMPANY STATE OF Florida Public Hearing No. COUNTY OF Miami-Dade Before me,the undersigned authority,personally appeared ,hereinafter the Affiant(s),who being first duly sworn by me,on oath,deposes and says: 1. Affiant is the manager,or managing member of the La Playa Beach Associates. Limited Liability Company with the following address: 1000-East-Ha lla ndale-Beach-Blvd-Su ite-B-H a lla ndale-Be ach-FL-33009 2. The Limited Liability Company owns or lease(circle one)the property, which is the subject of the proposed hearing. 3. The subject property is legally described as: See Attached 4. Affiant is legally authorized to file this application for public hearing: 5. Affiant understands this affidavit is subject to the penalties of law for perjury and the possibility of voiding of any zoning granted at public hearing. 6. Affiant understands that the matters attached to and made part of the application are honest and true to the best of my knowledge and belief. I understand this application must be complete and accurate before the application can be submitted and the hearing advertized. -Witnesses: - - i jjIPIP • r gnature G Evtuordo— , Print Name \lam,v 1a Tic . Print Name Sworn to and subscribed before me on the LI day of M n h ,20 1 , Affiant is personal y jsnmin to me or has produced _ i as Identification. nen n,N Notary(Stamp/Seal)Commission Expires: l 12`4 LI 5 - y` ♦♦!g, SABRINA FERREIRA- .4 )• MY COMMISSION FFF086874 Non/ EXPIRES January 27.2018 City of Sunny Isles Beach Comm mr- :•eS v l men epartment DISCLOSURE OF INTEREST If the property which is the subject of the application is owned or leased by a CORPORATION, list the principal stockholders and principal officers or stockholders consist of another corporation (s), trustee (s), partnership(s) or other similar entities, further disclosures shall be required which disclosures the identity of the individual(s)(natural persons having the ultimate ownership interest in the aforementioned entity). Corporation Name Name,Address and Office Percentage of Stock If the property which is the subject of the application is owned or leased by a LIMITED LIABILITY COMPANY list the members or stockholders consist of another corporation (s), trustee (s), partnership (s) or other similar entities, further disclosures shall be required which disclosures the identity of the individual(s)(natural persons having the ultimate ownership interest in the aforementioned entity). La Playa Beach Associates, LLC , which is owned as follows: LLC Name Name,Address and Office Percentage of Stock La Playa MM, LLC 56.91% CH La Playa, LLC 22.98% SM La Playa, LLC 20.11% City of Sunny Isles Beach Community Development Department If the property,which is the subject of the application, is owned or leased by a TRUSTEE, list the beneficiaries of the trust and the percentage of interest held by each. {Note: where the beneficiary (s) consist of corporation (s), another trust (s), partnership (s) or other similar entities, further disclosure shall be required which disclosures the identity of the individual (s), (natural persons) having the ultimate ownership interest in the aforementioned entity}. Trust Name Name and Address Percentage of Interest If the property, which is the subject of the application, is owned or lease by a PARNERTSHIP or LIMITED PARTNERSHIP, list the principals of the partnership, including general and limited partners. {Note; where the other similar entities, further disclosures shall be required which disclosures the identity of the individual (s)(natural person) having the ultimate ownership interest in the aforementioned entity}. PARTNERSHIP OR LIMITED PARTNERSHIP NAME NAME AND ADDRESS PERCENTAGE OF OWNERSHIP If there is a CONTRACT FOR PURCHASE, whether contingent on this application or not and whether a Corporation, Trustee or Partnership list the names of the contract purchasers below, including the principal officers, stockholders,beneficiaries or partners. {Note; where the principal officers, stockholders,beneficiaries or partners consist of another corporation, trust, partnership or other similar entities, further disclosure shall be required which discloses the identity of the individual (s) (natural persons) having the ultimate ownership interest in the aforementioned entity}. NAME City of Sunny Isles Beach Community Development Department NAME.ADDRESS AND OFFICE(if applicable) Percentage of Interest Date of Contract: If any contingency clause or contract terms involve additional parties, list all individuals or officers,if a corporation, partnership or trust. For any changes of ownership or changes in contracts for purchase subsequent to the date of the application, but prior to the date of final public hearing, a supplemental disclosure of interest shall be filed. The above is a full disclosure of all parties of interest in the application to the best of my knowledge and belief. fige7" • Signature: �� (Applicant) COI UOrCIO rnerl j Sworn to and subscribed before me, // This- 4-- —day of—M arck-L —� - - ,20-16 ota', Public,State of Fl uride at Large p�"7ct, SABRINA FERREIRA `r) MY COMMISSION#FF08B874 1 .Lr} I'Q •�a EXPIRES January 27.2018 My Commission Expires: // G taan 39eo153 FbrlCaHotarySelNR.tom • Disclosure shall not be required of any entity; the equity interest is which are regularly traded on an established securities market in the United States or other country;or any entity, the ownership interest of which are held in a limited partnership consisting of more than 5,000 separate interest and where no one person or entity holds more than a total of 5%of the ownership interest in the limited partnership. City of Sunny Isles Beach Community Development Department Public Hearing No: RESPONSIBILITIES OF THE APPLICANT PLEASE READ CAREFULLY BEFORE SIGNING I hereby acknowledge that I am aware of the preliminary review of plans of the proposed project by the Department of Environmental Protection (DEP), and/or the Department of Environmental Resources Management(DERM),the Florida Department of Transportation(FOOT). In addition, the Miami-Dade County Fire Department (MDFD) for the staging area of the proposed project along with the Miami-Dade County Biscayne Bay Shoreline Development Review Committee will review and comment for approval all development applications. These comments sometimes include requirements for an additional public hearing before(DERM)and the Environmental Quality Control Board, (EQCB) in the preparation and execution of agreements to run with the land,which are recorded,prior to obtaining a building permit. I understand that is my responsibilities as the applicant or applicants representative to promptly follow through with the compliance of DEP, DERM, MDFD, and /or Florida Department of Transportation FDOT requirements or to advise this office in writing if the application will not go forward and may be considered withdrawn. Contact with the above-mentioned agencies is advised during the hearing process. Permit requirements: I also understand that the Florida Building Code, DEP, DERM,MDFD,and /or Florida Department of Transportation FDOT may contain requirements that affect my ability to obtain a required building permit for my project, even if the zoning application is approved at public hearing. I am aware that a Building Permit is required for all construction and that I am responsible for obtaining the required permit, all required inspections, the Certificate of Use and Occupancy or Certificate of Completion for any and all structures and additions whether proposed or existing without permits. Additionally I am aware a Certificate of Use and Occupancy must be obtained for the use of the property, if approved at a Zoning Hearing and that failure to obtain the required permits and/or Certificates of Completion, Use and Occupancy will result in the initiation of enforcement action against the occupant and owner. I further understand that submittal of Zoning Hearing application will not necessary forestall enforcement action against the property. Fees: I understand that the hearing fees paid at the time of filing may not be the total cost of the hearing and that I will be advised of any other fees that can be associat i • t1. 8ublic hearing application. Are. Signature Eduardo rmenj Print Name Notary: Sworn to and subscribed before me this Li day of H QYGIn , 2016 J■' I ��\@ SABRINA FERREIRA •tary Public-State of FloridayI• MY COMMISSION BFF088874 Tio-til EXPIRES January 27,2018 (407)3984153 FIoddallotmySeMCe.COm My commission expires 1114-11€ City of Sunny Isles Beach Community Development Department I =r i WEISS SEROTA HELFMAN COLE & BIERMAN f' Y. , nn:fA;. Sad AT THE CROSSROADS OF BUSINESS, GOVERNMENT 416E THE LAW CLIFFORD A.SCHULMAN, PARTNER CSchulman@wsh-law.com March 4, 2016 RECEIVED Via Hand Delivery Ms. Claudia Hasbun, Zoning Administrator MAR - 4 2016 City of Sunny Isles Beach 18070 Collins Avenue -'C Suite 250 PLANNING & ZONING DEPT. Sunny Isles Beach, Florida 33160 City of Sunny Isles Beach,FL Re: Letter of Intent/La Playa Beach Associates, LLC/Property located at 18801 Collins Avenue/Application for Major Modification of Previously Approved Site Plan Approval for a Phased Development/Approval for Use of Public or Private TDRs Dear Ms. Hasbun: On behalf of La Playa Beach Associates, LLC (the "Applicant"), the owner of the approximately 4.716 acre ocean front property located at the above referenced address (the "Property") we respectfully submit this Letter of Intent in connection with your Department's rules and regulations for filing a Public Hearing Application in the City of Sunny Isles Beach (the "City"). We are particularly pleased and proud to be able to bring to the Florida Riviera the next vision of the Chateau Group and Fortune International, which recently brought to the City the Ritz-Carlton Residences. The Property was previously approved by the Commission on November 19, 2015 through the adoption of Resolution No. 2015-2497 and the Commission approved the application for use of public TDRs in the amount of 283,485 square feet (and 119 dwelling units) through the adoption of Resolution No. 2015-2497 passed and adopted on the same date. That prior approval was for 431 residential units; 60 hotel units; and, 90 apartment hotel units. The present plan eliminates both the hotel and apartment hotel units and, instead, seeks approval for 490 residential units alone. The Applicant believes that the elimination of the hotel and apartment hotel units will significantly reduce traffic impacts from the Project. In addition, the present plan captures all required parking on site and without the need for any shared parking agreement. The Project also proposed to have 12 cabana/suites in the building and ownership of these cabanas will be restricted to unit owners within the property 2525 Ponce de Leon Blvd., Suite 700, Coral Gables, FL 33134 1305-854-0800 I www.wsh-law.com • Ms. Claudia Hasbun March 4, 2016 Page 2 of 3 The new plans also calls for removal of the bridge between the two towers as shown on the prior plans and replacement of the bridge with an open air canopy. Finally, since the approval of the prior Project the City Commission has also approved the potential transfer of 75,000 square feet (and 35 dwelling units) from the property known as the "Corner House" property to this site, through the adoption of Resolution No. 2016-2511 on January 21, 2016. The Applicant would seek approval to utilize both the public and private TDRs, at the applicant's option, but without exceeding the permitted FAR and density permitted for the overall Project. It must be noted that the present plans, like its predecessor; does not require or call for any variances from the requirements of the LDRs. 1. Site plan approval adopting the plans entitled "Varadero" as prepared by the architecture firm ODP, Architects Inc. and dated March, 4, 2016 and consisting of two phased 56 story residential towers with 490 residential units; a branded restaurant of approximately 7,181 square feet; and, corporate office space of approximately 7,780 square feet and 1,850 square feet of retail for a total of 1,228,154 square feet of floor area.; 2. Approval of the ability to utilize up to 75,000 square feet (and 35 dwelling units) in the alternative and at the option of the Applicant in lieu of a portion of the 283,485 square feet of previously approved public TDRs. 3. Modification of Condition No. 13 of Resolution No. 15-Z-156 so as to allow the issuance of building permits to each phase of the Project and the incremental payment of bonuses and TDRs as utilized for each Phase of the Project. 4. All other conditions and approvals contained in Resolution No. 15-Z-156 would stay in full force and effect. The Applicant will agree to submit a traffic/pedestrian study for a mid-block crosswalk at Collins Avenue south of 189`h Street, within 1 year from the date of the approval of this site plan. The Applicant has already met or is in the process of meeting with: the Miami-Dade County Fire Department to discuss staging of the proposed development; the City of North Miami Beach regarding water availability; Miami-Dade County Water and Sewer Department regarding sewer availability; the Florida Department of Transportation regarding Collins Avenue; the Florida Department of Environmental Protection regarding the building siting in relationship to the Coastal Construction Control Line; and the Applicant has retained the services of a consultant to process its application through the Federal Aviation Administration. The Applicant is committed to continue to meet and discuss the proposed development with these agencies throughout the site plan process and will obtain any necessary approvals from these agencies prior to initiating construction. We submit that the requested approval is consistent with the provisions of the City's Comprehensive Plan and LDRs. Thank you for your consideration of this application. We look rn WEISS SEROTA HELEMAN COLE & BIERMAN ® AT AM C.mM.o.m ar NASHUf.Cov[LN uOn&nv LAW • Ms. Claudia Hasbun March 4, 2016 Page 3 of 3 forward to your favorable review. If we can provide you with additional information or documents,please do not hesitate to contact me at(305) 854-0800. Very tru, you li ord A. chul an CASt2798.001 Enclosures cc: Hans Ottinot, Esq. Celina M. Vazquez Esteban Koffsman Manual Grosskopf Eduardo Imery Chad Friedman, Esq. Fes, WEISS SE ROTA HELFMAN A THE COLE a&yBIERMAN LM WEIS_S SEROTA HELFMAN [74q COLE ,8,EBIERMAN AT THE CROSSROADS OF BUSINESS, GOVERNMENT & THE LAW CLIFFORD A. SCHULMAN, PARTNER CSchulma nPwsh-law.com March 23, 2016 RECEIVED Via Hand Delivery Ms. Claudia Hasbun. Zoning Administrator City of Sunny Isles Beach V MAR 2 3 2016 18070 Collins Avenue f>"y .ovo _O3 Suite 250 Sunny Isles Beach, Florida 33160 PLANNING & ZONING DEPT. City of Sunny Isles Beach,Ft. Re: Amended Letter of Intent/La Playa Beach Associates, LLC/Property located at 18801 Collins Avenue/Application for Major Modification of Previously Approved Site Plan Approval for a Phased Development/Approval for Use of Public or Private TDRs Dear Ms. Hasbun: On behalf of La Playa Beach Associates, LLC (the "Applicant"), the owner of the approximately 4.716 acre ocean front property located at the above referenced address (the "Property") we respectfully submit this Letter of Intent in connection with your Department's rules and regulations for Udine a Public Hearing Application in the City of Sunny Isles Beach (the "City"). We are particularly pleased and proud to be able to bring to the Florida Riviera the next vision of the Chateau Group and Fortune International, which recently brought to the City the Ritz-Carlton Residences. The Property was previously approved by the Commission on November 19, 2015 through the adoption of Resolution No. 15-Z-156 and the Commission approved the application for use of public TDRs in the amount of 283,485 square feet (and 119 dwelling units) through the adoption of Resolution No. 2015-2497, passed and adopted on the same date. That prior approval was for 431 residential units; 60 hotel units; and, 90 apartment hotel units. The present plan eliminates both the hotel and apartment hotel units and, instead, seeks approval for 490 residential units alone. The Applicant believes that the elimination of the hotel and apartment hotel units will significantly reduce traffic impacts from the Project. In addition, the present plan captures all required parking on site and without the need for any shared parking agreement. The Project also proposed to have 12 cabana/suites in the building and ownership of these cabanas will be restricted to unit owners within the property The new plans also calls for removal of the bridge between the two towers as shown on the prior plans and replacement of the bridge with an open air canopy. 2525 Ponce de Leon Blvd., Suite 700, Coral Gables, FL 33134 1305-854-0800 I www.wsh-law.com Ms. Claudia Hasbun March 23, 2016 Page 2 of 3 Finally, since the approval of the prior Project the City Commission has also approved the potential transfer of 75,000 square feet (and 35 dwelling units) from the property known as the "Corner House" property to this site, through the adoption of Resolution No. 2016-2511 on January 21, 2016. The Applicant would seek approval to utilize both the public and private TDRs, but without exceeding the permitted FAR and density permitted for the overall Project. It must be noted that the present plans, like its predecessor, does not require or call for any variances from the requirements of the LDRs. 1. Site plan approval adopting the plans entitled "Varadero" as prepared by the architecture firm ODP. Architects Inc. and dated March. 30. 2016 and consisting of two phased 56 story residential towers with 490 residential units; a branded restaurant of approximately 7,181 square feet; and, corporate office space of approximately 7,780 square feet and 1,850 square feet of retail for a total of 1,228,1 54 square feet of floor area.; 2. Approval to amend Resolution No. 2015-2497 so as to allow the Applicant the ability to utilize up to 75,000 square feet (and 35 dwelling units) in lieu of a portion of the 283,485 square feet of previously approved public TDRs; 3. Modification of Condition No. 13 of Resolution No. 15-Z-I56 so as to allow the issuance of building permits to each phase of the Project and the incremental payment of bonuses and TDRs as utilized for each Phase of the Project. The Applicant, pursuant to Ordinance No. 2012-389, is requesting an extension of time in which to pay for the bonuses and TDRs that were approved by the Commission by Resolution Nos. 15-Z-156 and 2015-2497. We would propose an up to 72 month extension of time for such payments to coincide with extension of time granted by the Commission in Resolution No. 15-Z-156. The total payments that would be extended would be in total amount of 538,284.497, which constitutes the total of bonuses and TDRs owed to city after the reduction of 75,000 square feet ($9,375,000) of TDRs being transferred from the Corner House site to the La Playa site. La Playa would agree to pay pursuant to a promissory note approved by the Commission in the amount of 538,284,497 under the following terms: (i) principal in the amount of$38,284, 497, unless reduced by payments, shall be due at the end of the Term; (ii) the principal amount shall be subject to an interest rate of_%; (iii) interest payments shall be made to the City on a quarterly basis; (iv) principal payments shall be made upon the application for building permits for the two approved residential towers (Tower I and Tower II) as set forth below; (v) in the event application for building permit is made for Tower 1, the principal amount of $23,618,345.91 shall be made prior to the issuance of the building permit for Tower l; (vi) in the event application for building permit is made for Tower II, the principal amount of $5,291,166.09 shall be made prior to the issuance of the building permit for Tower II; and (vii) La Playa shall receive and �AWEISS SEROTA HELFMAN COLE & BIERMAN At ra Cwo as os or 4sixax Gomioarn&no La, Ms. Claudia Hasbun March 23, 2016 Page 3 of 3 automatic ninety (90) day ("Penalty Period") extension of the Term subject to a % annual interest rate during the penalty period un the principal balance is paid in full; (viii) the City shall have the right to revoke any building permits issued to La Playa pursuant to Zoning Resolutions 15-Z-156 and 16-Z- if La Playa, or its assignees fail to make the required payments under this Agreement and any promissory note that is required by the Agreement. 4. All other conditions and approvals contained in Resolution No. 15-Z-156 would stay in full force and effect. The Applicant will agree to submit a traffic/pedestrian study for a mid-block crosswalk at Collins Avenue south of 189th Street; within 1 year from the date of the approval of this site plan. The Applicant has already met or is in the process of meeting with: the Miami-Dade County Fire Department to discuss staging of the proposed development; the City of North Miami Beach regarding water availability; Miami-Dade County Water and Sewer Department regarding sewer availability; the Florida Department of Transportation regarding Collins Avenue; the Florida Department of Environmental Protection regarding the building siting in relationship to the Coastal Construction Control Line; and the Applicant has retained the services of a consultant to process its application through the Federal Aviation Administration. The Applicant is committed to continue to meet and discuss the proposed development with these agencies throughout the site plan process and will obtain any necessary approvals from these agencies prior to initiating construction. We submit that the requested approval is consistent with the provisions of the City's Comprehensive Plan and LDRs. Thank you for your consideration of this application. We look forward to your favorable review. If we can provide you with additional information or documents, please do not hesitate to contact me at (305) 854-0800. Very tru youyeT i•ord A. Sc/chhhuul an CAS/2798.001 Enclosures cc: Hans Ottinot, Esq. Celina M. Vazquez Esteban Koffsman Manual Grosskopf Eduardo lmery Chad Friedman, Esq. 74WEISS SEROTA HELFMAN COLE & BIERMAN Arra Cwsuam of Bmvuus.Gov[w.wi&ixs LAW Varadero, Sunny Isles 18801 COLLINS AVE, CITY OF SUNNY ISLES BEACH, FL 33160 SITE PLAN APPROVAL DATE ISSUED 10-02-2015 DATE ISSUED 10-29-2015 DATE ISSUED 11-04-2015 ARCHITECTURAL DRAWINGS: LANDSCAPE DRAWINGS: TRAFFIC REPORTN/A SHEET TITLENUMBER L-0.000.00 PLANTING TABULATIONS SHEET TITLENUMBER A-0.000.00 COVER PAGE X 09 / 0 4 / 2 0 1 5 A. S I T E P L A N A P P R O V A L IS S U A N C E I D # X A-0.001.01 A-0.010.00 A-0.010.01 A-0.050.00 A-0.100.00 A-0.101.00 A-0.102.00 A-0.201.00 A-0.202.00 A-0.203.00 A-0.204.00 A-0.301.00 A-0.310.00 A-0.450.00 A-0.103.00 A-0.104.00 INDEX GENERAL NOTES FLOOR AREA RATIO KEY PLANS SITE PLAN BASEMENT LEVEL B1 LEVEL 01 LEVEL 02 GROUND LEVEL 03 LEVEL 04 PARALLEL TO COLLINS ELEVATION NORTH ELEVATION TOWER 2 EAST ELEVATION SOUTH ELEVATIONS TOWER 1 SECTION 01 PODIUM SECTIONS SECTION 03 X X X X X X X X X X X X X X X SHEET TITLENUMBER COLLINS TRAFFIC & CIVIL DRAWINGS: COVER SHEET AND LOCATION MAPC-0 X SHEET TITLENUMBER ON-SITE TRAFFIC & CIVIL DRAWINGS: SITE AND PAVING PLANC-1 X SITE AND PAVING DETAILSC-2 X OVERALL GRADING AND DRAINAGE PLANC-3 X DRAINAGE PLANC-4 X DRAINAGE PLANC-5 X GRADING PLANC-6 X GRADING PLANC-7 X STORM DRAINAGE DETAILSC-8 X SEDIMENT TANK AND DRAINAGE WELL #1C-9 X SEDIMENT TANK AND DRAINAGE WELL #2C-10 X SEDIMENT TANK AND DRAINAGE WELL #3C-11 X SEDIMENT TANK AND DRAINAGE WELL #4C-12 X SEDIMENT TANK AND DRAINAGE WELL #5C-13 X SEDIMENT TANK AND DRAINAGE WELL #6C-14 X SEDIMENT TANK AND DRAINAGE WELL #7C-15 X SEDIMENT TANK AND DRAINAGE WELL #8C-16 X CDS HYDRONOMIC SEPARATOR DETAILC-17 X SITE UTILITIES PLANC-18 X SITE UTILITIES PLANC-19 X SITE UTILITIES PLANC-20 X WATER DETAILSC-21 X WATER DETAILSC-22 X WATER PROFILESC-23 X SEWER PROFILESC-24 X A-0.105.00 L05 TO L07 TOWER1 TYP HOTEL TOWER2 X A-0.115.00 L15 TO L44 TYPICAL RESIDENTIAL 8 UNITS X A-0.145.00 L45 TO L51 TYPICAL RESIDENTIAL 6 UNITS X A-0.152.00 L52 TO L53 TYPICAL SUITES 4 UNITS X A-0.154.00 L54 TO L55 PENTHOUSE X A-0.156.00 ROOF PLAN X L-1.000.00 LANDSCAPE LAYOUT PLAN L-2.000.00 LANDSCAPE MATERIALS PLAN L-3.000.00 LANDSCAPE PLANTING PLAN L-3.100.00 PLANTING SCHEDULE L-4.000.00 SITE PLANTING LIGHTING L000 COVER A-0.010.02 UNIT DISTRIBUTION X A-0.114.00 L14 MEP FLOOR X A-0.108.00 L08 TO L13 TYPICAL APARTMENT-HOTEL X A-0.010.03 COLLINS ELE. W/ 75' SEPARATION L-5.000.00 DITIAL TYPICAL PLANTING L-6.000.00 LANDSCAPE ILLUSTRATIVE PLAN 10 / 0 3 / 2 0 1 5 A. S I T E P L A N A P P R O V A L X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X SHARED PARKING ANALYSISN/A X X daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS DRAWING INDEX A-0.001.01 ODP 11/02/2015 1/32"= 1'-0" CL LEVEL B1 LEVEL 01 LEVEL 02 ELEVATION -4'-0" ELEVATION +15'-8" ELEVATION +6'-0" ELEVATION +26'-0" ELEVATION -8'-0" TOP OF PODIUM COLLINS 10'-0" MIN. CO L I N S A V E R I G H T OF W A Y 75'-0" 50'-0" MA X I M U M P A R K I N G ST R U C T U R E EN C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MAXIMUM HEIGHT FOR GARAGE STRUCTURE 17'-6" SEE FLOOR PLAN A-0.100.00 20 ' - 6 " 4:1 MAX S L O P E L I N E FROM PRO P E R T Y T O F R O N T S E T B A C K 25'-0"PR O P E R T Y L I N E 50'-0" MAX. PR I M A R Y S T R U C T U R E S (T O W E R S ) MA X I M U M S E T B A C K (P O D I U M ) PR O P E R T Y L I N E 3: 2 M A X S L O P E L I N E UP T O 5 0 ' - 0 " H I G H LEVEL B1 LEVEL 01 LEVEL 02 ELEVATION -4'-0" ELEVATION +15'-8" ELEVATION +6'-0" ELEVATION +26'-0" ELEVATION -8'-0" TOP OF PODIUM COLLINS LEVEL 03ELEVATION +42'-4" TOWER LEVEL LEVEL 04ELEVATION +54'-4" TOWER LEVEL 6'-0"ALLOWED4'-8" 25'-0" MIN @ TOWER 25'-0" MIN @ PODIUM 10 ' - 0 " PODIUM LEVEL PODIUM LEVEL TOWER TOWER PODIUM LEVEL daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.010.0011/02/2015 N/A CL GENERAL NOTES PROJECT DATA FOLIO: 31-2202-003-0120 PROJECT ADDRESS: FOLIO NUMBERS: ZONING CLASSIFICATION: FUTURE LAND USE DESIGNATION: F.E.M.A. FLOOD ZONE: GROSS LOT AREA: 18801 COLLINS AVE, CITY OF SUNNY ISLES BEACH, FL 33160 31-2202-003-0120 MIXED USE - RESORT DISTRICT (MU-R) MIXED USE - HIGH DENSITY/RESORT ZONE DESIGNATION X, AE (ELEV 8) & VE (ELEV 10) 205,424 SQ FT. (≈4.716 ACRES) SITE DEVELOPMENT STANDARDS MINIMUM LOT WIDTH: MINIMUM LOT AREA: MAXIMUM HEIGHT : LOT COVERAGE ( REF TO A-0.010.01) SEC 265-35 D (1) SEC 265-35 D (1) SEC 265-35 D (2) B SEC 265-35 D (3) 200' 20,000 SQFT FEDERAL AVIATION ADMINISTRATION HEIGHT RESTRICTIONS. (649'-0" NGVD) MAX 60% OF THE AREA OF THE LOT. MINIMUM SETBACKS FRONT SETBACK BELOW GRADE GARAGE: PORTE COCHERE: TOWER: REAR SETBACK BELOW GRADE GARAGE: PEDESTAL: TOWER: INTERIOR SIDE SETBACK NORTH BELOW GRADE GARAGE: PEDESTAL: TOWER (PRIMARY STRUCTURES): SOUTH BELOW GRADE GARAGE: PEDESTAL: TOWER: SEC 265-35 D (4) A.1 SEC 265-35 D (4) B.1 SEC 265-35 D (4) C.1 10'-0" 50'-0" 75'-0" 35' FROM PROPERTY LINE 35' FROM PROPERTY LINE 35' FROM PROPERTY LINE PROPERTY LINE 3:2 MAX 50' 25'-0"* PROPERTY LINE 3:2 MAX 50' 25'-0"** MINIMUM SEPARATION BETWEEN BUILDINGS SEC 265-35 D (5)75'-0"*** † MAXIMUM BUILDING WIDTH SEC 265-35 D (6)250'-0" EASEMENTS REQUIRED BEACH EASEMENT PUBLIC OCEANFRONT PARK AND OPEN SPACE SEC 265-35 D (8) 20'-0" 10,000 SQFT Base F.A.R. Ratio Beach Access Bonus Access Easement Beach Access Trust Fund Public Beach Recreational Enhancement Bonus Collins Avenue Public Streetscape Enhancements Bonus Sunny Isles Beach Public Parking Bonus Public Oceanfront Park and Open Space Enhancements Bonus Educational and Cultural Infrastructure Bonus. Sec 265-35 D (9) b Sec 265-35 D (9) c.1 Sec 265-35 D (9) c.2 Sec 265-35 D (9) c.3 Sec 265-35 D (9) c.4 Sec 265-35 D (9) c.5 Sec 265-35 D (9) c.6 2.50 0.10 0.20 0.60 0.60 0.20 0.20 0.20 TOTAL FLOOR AREA RATIO (Without TDRs) PURCHASED TDRs INCREASE IN FAR THROUGH TDRs TOTAL FAR RATIO (WITH TDRs) 4.60 1.38 30% 5.98 TOTAL FAR BUILDABLE AREA & TDRs 1,228,435 SQFT TOWER 1 GFA LEVEL B1 GARAGE LEVEL 01 LEVEL 02 LEVEL 03 LEVEL 04 L05 TO L07 HOTEL L08 TO L13 L15 TO L44 RESI 8 UNIT L45 TO L51 RESI 6 UNITS L52 TO L53 RESI 4 UNITS L54 TO L55 RESI 2 UNITS TOWER 2 GFA L05 TO L41 RESI 3 UNIT L42 TO L53 RES 2 UNIT L54 TO L55 LOADING size for one required loading space in MU-R size standard required loading spaces Sec 265-35 D (14) OPEN SPACE REQUIREMENTS MIN. REQ'D OPEN SPACE OF 40% OF TOTAL LOT AREA MAX. ALLOWED HARDSCAPE 50% OF REQ'D OPEN Sec 265-35 D (15) AMOUNT OF OFF-STREET PARKING MULTIFAMILY DWELLING 1.50 SPACES¹ 2.00 SPACES 5% GUEST PARKING FOR BLDNGS W/OUT VALET APARTMENT-HOTELS 1.00 1 BEDROOM UNIT 1.75 2 BEDROOM UNIT 2.00 3 OR MORE BEDROOM UNIT HOTEL 1.00 FOR EACH ROOM OR SUITE 1.00 PER 100 SQFT LOBBY LOUNGE 1.00 PER 100 SQFT RESTAURANT IN MU-R DIST 1.00 PER 200 SQFT MEETING & EVENT VENUE 1.00 PER 250 SQFT FITNESS & RECREATIONAL Sec 265-46 B * ** *** † MINIMUM SETBACK OF 25 FEET REQUIRES A FEE PAYMENT OF $1,000,000.00 PER ELIGIBLE PARCEL. MINIMUM SETBACK OF 25 FEET REQUIRES A FEE PAYMENT OF $1,000,000.00 PER ELIGIBLE PARCEL. MINIMUM SEPARATION MAY BE REDUCED BY THE CITY MANAGER NOT MORE THAN 25% UPON A WRITTEN FINDING BY ZONING, PLANNING AND BUILDING DIRECTOR THAT OPPOSING BUILDING WALLS OF THE ADJACENT BUILDINGS ARE OFFSET, ANGLED OR HAVE MINIMAL WINDOW OPENINGS SUCH THAT RESIDENTIAL VIEWS FROM WITHIN THE TOWERS ARE NOT ADVERSELY IMPACTED BY PROXIMATE AND DIRECT FACING RELATIONSHIPS OF THE BUILDINGS. DISTANCE BETWEEN TOWERS IS PARALLEL TO COLLINS. MINIMUM DISTANCE REQUIRED IS 100'. A 25% REDUCTION IS BEING REQUESTED. REFER TO LETTER PROVIDED FOR REDUCTION COMPLIANCE. REQ'D PROVIDED REQ'D PROVIDED PER FL GFA 9,461 SQFT 21,466 SQFT 26,466 SQFT 25,673 SQFT 21,003 SQFT 15,145 SQFT 16,112 SQFT 15,534 SQFT 15,997 SQFT 16,176 SQFT 10,872 SQFT 6,946 SQFT 6,610 SQFT 6,903 SQFT 41,085 SQFT MAX. 82,170 SQFT MIN. 17'-6" min 100'-0" min 150'-0" min 46'-0" min 140'-0" min 140'-0" min 26'-0" min SETBACK AT 25' 26'-0" min 80'-0" min 215'-0" max 20'-0" 10,000 SQFT min 11'-0" W x 35'-0" L Sec 265-46 D (2)OFF STREET LOADING over 100 units for each mult resi or apartment hotel up to 200 units for each hotel suit or room units 2 LOADING SPACES 2 LOADING SPACES 10'-0" W x 25'-0" L x 14' H 257 SPACES PER 171 UNITS 520 SPACES PER 260 UNITS 0 SPACES (VALET TO BE PROVIDED) 24 SPACES PER 24 UNITS 95 SPACES PER 54 UNITS 24 SPACES PER 12 UNITS 60 SPACES FOR 60 ROOMS 12 SPACES FOR 1,177 SQFT 48 SPACES FOR 4,776 SQFT 46 SPACES FOR 9,034 SQFT 20 SPACES FOR 4,847 SQFT AMENITY OPEN TO THE PUBLIC GRAND TOTAL PARKING SPACES REQ'D PROVIDED 1,114 SPACES 1,022 SPACES² REQ'D PROVIDED 11'-0" W x 35'-0" L 10'-0" W x 25'-0" L x 14' H 41,085 SQFT MAX. 82,170 SQFT MIN. TOTAL LOADING SPACES 4 LOADING SPACES 4 LOADING SPACES TOTAL BUILDABLE AREA PROVIDED 1,228,399 SQFT 878,271 SQFT 350,128 SQFT TOTAL TOTAL L14 0 SQFT (3) (6) (30) (7) (2) (2) (1) (FL) (1) (1) (1) (1) (1) (FL) (2) (12) (37) PER FL GFA 8 SPACES FOR 2,161 SQFT OFFICE (ADMIN) 1.00 PER 300 SQFT OFFICE (ADMIN) ¹ 1 BEDROOM AND 2 BEDROOM UNITS ARE LESS THAN 1800 SQ.FT. ENHANCEMENTS BONUS COLLINS LANDSCAPE EASEMENT 10'-0"10'-0" min 4. MULTIFAMILY DWELLING TOWER 1MULTIFAMILY DWELLING 1 BEDROOMS <1800 SQ. FT. 60 UNITS 74 UNITS 106 UNITS 46 UNITS 4 UNITS 4 UNITS 37 UNITS 0 UNITS 49 UNITS 49 UNITS 0 UNITS 2 UNITS 2 BEDROOMS <1800 SQ. FT. 3 BEDROOMS >1800 SQ. FT. 4 BEDROOMS >1800 SQ. FT. 5 BEDROOMS >1800 SQ. FT. PENTHOUSE >1800 SQ. FT. ² REFERENCE "VARADERO SHARED PARKING ANALYSIS" LETTER PROVIDED. MULTIFAMILY DWELLING SITE WIDE TOTAL 137 UNITS APARTMENT-HOTEL SITE WIDE TOTAL 0 UNITS TOWER 2 521 UNITSTOWER 1 AND TOWER 2 TOTAL PROPERTY LINE SETBACK AT 25' PROPERTY LINE 777 SPACES PER 432 UNITS 143 SPACES 166 SPACES TOTAL TOTAL TOTAL 20 SPACESTOTAL 8 SPACESTOTAL 0 SPACES² SEC 265-5 APARTMENT-HOTEL UNITS SUBJECT TO 5% RESTRICTION PROVIDED 777 SPACES 117 SPACES² 257 SPACES 520 SPACES 49 SPACES² 7 SPACES² 28 SPACES² 42 SPACES² 2 SPACES² 0 SPACES² 20 SPACES² 77 SPACES² 20 SPACES² 126 SPACES² 2 SPACES² ADA REQUIREMENT ACCESSIBLE PARKING REQ'D PROVIDED 2% OF 1,114 REQUIRED PARKING SPACES 23 SPACES 23 SPACES 2. FRONT SETBACK 3. PODIUM NORTH & SOUTH SETBACK 1. PROJECT LOCATION PLAN N.T.S. 944,950.4 SQFTTOTAL FAR BUILDABLE AREA 294 UNITS 90 UNITS 5. HOTEL UNITS TOWER 1NUMBER OF UNITS HOTEL ROOMS 60 UNITS 0 UNITS TOWER 2 60 UNITSTOWER 1 AND TOWER 2 TOTAL TOP ELE. AT +26' NGVD TOP ELE. AT +26' NGVD 4 UNITS REQUIRED 4 UNITS RESTRICTED APARTMENT-HOTEL UNITS NAMES SUBJECT TO 5% NAME OF UNITS TO BE RESOLVE PRIOR TO ISSUANCE OF A BUILDING PERMIT. 6. ZONING DISTRICT REQUIREMENTS LEGAL DESCRIPTION ZONING DISTRICTS SITE DATA SUMMARY MAXIMUM DWELLING DENSITY CALCULATIONS Sec 265-35 D (10) DWELLING UNITS AS CALCULATED 70 DU/ACRE 125 (AS OF RIGHT) 80 (AS OF RIGHT) CONDOTEL DU/ACRE CONDO 332.48 0.56 4.156 4.716 TOTAL ACREAGE AVAILABLE 30% TRANSFER DEVELOPMENT RIGHTS CALCULATIONS DWELLING UNITS RECEIVED AS CALCULATED 283,485.12 SQFT PURCHASED TDR 1.38 ACRE USED ACRE USED AREA ALLOWED 119 TOTAL DWELLING UNITS INCLUDING TDRs 521 20.72 DU/ACRE 37 (+30% TDRs) 24 (+30% TDRs) CONDOTEL DU/ACRE CONDO 99.744 0.56 4.156 ACRE USED ACRE USED TOTAL DWELLING UNITS WITHOUT TDRs 402 TDR UNITS 90 CONDOTEL CONDO 431 PROPOSED TOTAL DWELLING DENSITY WITH 30% T.D.R.s TOTAL DWELLING UNITS RECEIVED AS CALCULATED 90.72 CONDOTEL CONDO 432.224 ALLOWED 90 CONDOTEL CONDO 431 120.464 119 ALLOWEDTOTAL DWELLING UNITS RECEIVED AS CALCULATED TOTAL 30% T.D.R.s PROPOSED ALLOWED ALLOWED CONDOTEL CONDO CONDOTEL CONDO 70 332 20 99 7. FLOOR AREA RATIO 8. DENSITY 9. PARKING & LOADING PROPOSED PROPOSED CONDOTEL CONDO CONDOTEL CONDO 20 99 70 332 EX T E N T O F S H A R E D P A R K I N G All of Tract "I", less the South 216.66 feet as measured at right angles to the South line of said Tract "I", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH That parcel of land lying East of and bounded on the West by the East line of said Tract "I", and bounded on the North by the Easterly extension of the North line of said Tract "I", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County, Florida, and bounded on the South by the Easterly extension of the North line of the South 216.66 feet, as measured at right angles to the South line of said Tract "I" of AMENDED PLAT NORTH BISCAYNE BEACH AND The South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami-Dade County, Florida. TOGETHER WITH That parcel of land lying East of and bounded on the West by the East line of said Tract "H", and bounded on the North by the Easterly extension of the North line of said South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami-Dade County, Florida, and bounded on the South by the Easterly extension of the South line of said Tract "H" of AMENDED PLAT NORTH BISCAYNE BEACH. LEVEL 01 GFA AREA = 21,466 SQ. FT. LEVEL 02 (GROUND) GFA TOTAL = 26,466 SQ. FT. LOT COVERAGE = 37,400 SQ. FT. PERCENT COVERED = 18.2% LANDSCAPE: = 78,931 SQ. FT. HARDSCAPE: = 41,085 SQ. FT. T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2T2T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 2 2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 T2T2 2 2 2 2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T3 T3 T3 T3 T3 T3 T3T3 T3T3 T3T3 T2T2 T3 T3 T2T2 T2T2 T3 T3T3 T3T3 T3 T3T3 T3T3 T3T3 T3T3 T1 T1 T1 T1 T1 2 T3T3 T3T3 T3T3 T3T3 T3T3 T3T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3T3 T3T3 3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3T3 T3T3T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 2 2 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 2 2 2 2 2 2 2 2 2 T2 T2 1 T3 T1 T1 T1 T1 T2 T2 T2 1 1 3 T2 T21 1 1 1 1 2 2 T2T2 2 2 2 2 2 2 2 2 T2 T2 T2 2 2 T3 2 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 T3 1 T3 T3 T3 T3 T3 T3 T3 T3 T3 1 1 1 1 1 1 T1 T1 T1 T1 T1 T1 T1 T1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU T1 1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T 1 T 1 T 1 T 1 1 1 1 1 1 1 1 1 1 1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1 T1T1 T1 T1 T1 T1 T1 T1 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T1 T1 T1 T1 T1T1 LEVEL B1 GFA AREA = 9,461 SQ. FT. 9461 SQ. FT. 5306 SQ. FT. 16160 SQ. FT. 6467 SQ. FT. 19999 SQ. FT. 5'-0" 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU LEVEL 03 GFA TOTAL = 25,673 SQ. FT. 1 1 1 1 1 1 1 1 1 1 6492 SQ. FT. 19341 SQ. FT. 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU sfElev, Stairs, MEP etc.1449.14583Non GFA sfElev, Stairs, MEP etc.####Non GFA sfElev, Stairs, MEP etc.####Non GFA sfCorridor286.00000GFA sfCorridor286.00000GFA sfElev, Stairs, MEP etc.1449.14583Non GFA sfElev, Stairs, MEP etc.1449.14583Non GFA sfElev, Stairs, MEP etc.####Non GFA sfElev, Stairs, MEP etc.####Non GFA sfCorridor286.00000GFA sfCorridor286.00000GFA sfElev, Stairs, MEP etc.1449.14583Non GFA sfElev, Stairs, MEP etc.1449.14583Non GFA sfElev, Stairs, MEP etc.####Non GFA sfElev, Stairs, MEP etc.####Non GFA sfCorridor286.00000GFA sfCorridor286.00000GFA sfElev, Stairs, MEP etc.####Non GFA sfElev, Stairs, MEP etc.####Non GFA sfCorridor286.00000GFA sfCorridor286.00000GFA sfElev, Stairs, MEP etc.2087.66738Non GFA sfElev, Stairs, MEP etc.1579.35493Non GFA UP UP Level 1 ELEV. +15'-8" DN Ram p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR R R RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU L05 TO L07 TYPICAL HOTEL & TYPICAL RESIDENTIAL 3 UNIT GFA TOWER 1 = 15,145 SQ. FT. GFA TOWER 2 = 6,946 SQ. FT. L15 TO L44 TYPICAL RESIDENTIAL 8 UNIT & TYPICAL RESIDENTIAL 3 UNIT GFA TOWER1 = 15,534 SQ. FT. GFA TOWER 2 = 6,946 SQ. FT. L45 TO L51 TYPICAL RESIDENTIAL 6 UNIT & TYPICAL RESIDENTIAL 3 UNIT GFA TOWER1 = 15,997 SQ. FT. GFA TOWER 2 = 6,610 SQ. FT. L52 TO L53 TYPICAL SUITES 2 UNITS & TYPICAL RESIDENTIAL 3 UNIT GFA TOWER1 = 16,176 SQ. FT. GFA TOWER 2 = 6,610 SQ. FT. ROOF PLAN GFA TOTAL= 0 SQ FT LEVEL 04 GFA TOTAL = 21,003 SQ. FT. L54 TO L55 PENTHOUSE & TYPICAL RESIDENTIAL 3 UNIT GFA TOWER1 = 10,872 SQ. FT. GFA TOWER 2 = 6,903 SQ. FT. 26 ' - 8 " sfElev, Stairs, MEP etc.####Non GFA sfElev, Stairs, MEP etc.####Non GFA sfCorridor286.00000GFA sfCorridor286.00000GFA L08 TO L13 APARTMENT-HOTEL &TYPICAL RESIDENTIAL 3 UNIT GFA TOWER1 = 16,112 SQ. FT. GFA TOWER 2 = 6,946 SQ. FT. 5,506 SQ. FT. 15,497 SQ. FT. 6,946 SQ. FT. 15,145 SQ. FT. 6,946 SQ. FT. 16,112 SQ. FT. 6,946 SQ. FT. 15,534 SQ. FT. 6,610 SQ. FT. 15,997 SQ. FT. 6,610 SQ. FT. 16,176 SQ. FT. 6,903 SQ. FT. 10,872 SQ. FT. daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.010.01 ODP 11/02/2015 N.T.S. CL FLOOR AREA RATIO KEY PLANS GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: PARKING SPACES GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: PARKING SPACES NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, ANCILLARY EQUIP. & STORAGE NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: OPEN TO BELOW GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: OPEN TO BELOW GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: OPEN TO BELOW GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. GFA: NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. NOT INCLUDED: ELEVATORS, STAIRWELLS, METER ROOMS, & ANCILLARY EQUIP. 45'-0" 35'-4" 152'-4" 140'-0" 152'-0" 139'-11" 152'-4" 80 ' - 3 " 80 ' - 3 " 120'-8" 101'-4" 101'-4" 21 4 ' - 3 " 99 ' - 8 " 156'-2" 80 ' - 3 " 26 ' - 8 " 26 ' - 7 " 150'-11" 80 ' - 3 " 80 ' - 3 " 80 ' - 3 " 80 ' - 3 " Dropoff L1 Parking Delivery BOHB1 Parking B1 Parking Tech T1 Lobby T2 Lobby Lounge Cafe B1 VALET PARKING L1 SELF PARKING & AMENITIES L2 MAIN LOBBIES & AMENITIES L3 AMENITIES L4 AMENITIES L5 RESIDENTIAL 3 UNIT LAYOUT L6 RESIDENTIAL 3 UNIT LAYOUT L7 RESIDENTIAL 3 UNIT LAYOUT L8 RESIDENTIAL 3 UNIT LAYOUT L9 RESIDENTIAL 3 UNIT LAYOUT L10 RESIDENTIAL 3 UNIT LAYOUT L11 RESIDENTIAL 3 UNIT LAYOUT L12 RESIDENTIAL 3 UNIT LAYOUT L13 RESIDENTIAL 3 UNIT LAYOUT L14 RESIDENTIAL 3 UNIT LAYOUT L15 RESIDENTIAL 3 UNIT LAYOUT L16 RESIDENTIAL 3 UNIT LAYOUT L17 RESIDENTIAL 3 UNIT LAYOUT L18 RESIDENTIAL 3 UNIT LAYOUT L19 RESIDENTIAL 3 UNIT LAYOUT L21 RESIDENTIAL 3 UNIT LAYOUT L22 RESIDENTIAL 3 UNIT LAYOUT L23 RESIDENTIAL 3 UNIT LAYOUT L24 RESIDENTIAL 3 UNIT LAYOUT L25 RESIDENTIAL 3 UNIT LAYOUT L26 RESIDENTIAL 3 UNIT LAYOUT L27 RESIDENTIAL 3 UNIT LAYOUT L28 RESIDENTIAL 3 UNIT LAYOUT L29 RESIDENTIAL 3 UNIT LAYOUT L20 RESIDENTIAL 3 UNIT LAYOUT L31 RESIDENTIAL 3 UNIT LAYOUT L32 RESIDENTIAL 3 UNIT LAYOUT L33 RESIDENTIAL 3 UNIT LAYOUT L34 RESIDENTIAL 3 UNIT LAYOUT L35 RESIDENTIAL 3 UNIT LAYOUT L36 RESIDENTIAL 3 UNIT LAYOUT L37 RESIDENTIAL 3 UNIT LAYOUT L38 RESIDENTIAL 3 UNIT LAYOUT L39 RESIDENTIAL 3 UNIT LAYOUT L30 RESIDENTIAL 3 UNIT LAYOUT L41 RESIDENTIAL 3 UNIT LAYOUT L42 RESIDENTIAL 2 UNIT LAYOUT L43 RESIDENTIAL 2 UNIT LAYOUT L44 RESIDENTIAL 2 UNIT LAYOUT L45 RESIDENTIAL 2 UNIT LAYOUT L46 RESIDENTIAL 2 UNIT LAYOUT L47 RESIDENTIAL 2 UNIT LAYOUT L48 RESIDENTIAL 2 UNIT LAYOUT L49 RESIDENTIAL 2 UNIT LAYOUT L40 RESIDENTIAL 3 UNIT LAYOUT L51 RESIDENTIAL 2 UNIT LAYOUT L52 RESIDENTIAL 2 UNIT LAYOUT L53 RESIDENTIAL 2 UNIT LAYOUT L50 RESIDENTIAL 2 UNIT LAYOUT L54 RESIDENTIAL 1 UNIT LAYOUT L55 RESIDENTIAL 1 UNIT LAYOUT VALET PARKING B1 SELF PARKING & AMENITIES L1 MAIN LOBBIES & AMENITIES L2 AMENITIES L3 AMENITIES L4 HOTEL L5 HOTEL L6 HOTEL L7 CONDOTEL L8 CONDOTEL L9 CONDOTEL L10 CONDOTEL L11 CONDOTEL L12 CONDOTEL L13 MEP L14 RESIDENTIAL 8 UNIT LAYOUT L15 RESIDENTIAL 8 UNIT LAYOUT L16 RESIDENTIAL 8 UNIT LAYOUT L17 RESIDENTIAL 8 UNIT LAYOUT L18 RESIDENTIAL 8 UNIT LAYOUT L19 RESIDENTIAL 8 UNIT LAYOUT L21 RESIDENTIAL 8 UNIT LAYOUT L22 RESIDENTIAL 8 UNIT LAYOUT L23 RESIDENTIAL 8 UNIT LAYOUT L24 RESIDENTIAL 8 UNIT LAYOUT L25 RESIDENTIAL 8 UNIT LAYOUT L26 RESIDENTIAL 8 UNIT LAYOUT L27 RESIDENTIAL 8 UNIT LAYOUT L28 RESIDENTIAL 8 UNIT LAYOUT L29 RESIDENTIAL 8 UNIT LAYOUT L20 RESIDENTIAL 8 UNIT LAYOUT L31 RESIDENTIAL 8 UNIT LAYOUT L32 RESIDENTIAL 8 UNIT LAYOUT L33 RESIDENTIAL 8 UNIT LAYOUT L34 RESIDENTIAL 8 UNIT LAYOUT L35 RESIDENTIAL 8 UNIT LAYOUT L36 RESIDENTIAL 8 UNIT LAYOUT L37 RESIDENTIAL 8 UNIT LAYOUT L38 RESIDENTIAL 8 UNIT LAYOUT L39 RESIDENTIAL 8 UNIT LAYOUT L30 RESIDENTIAL 8 UNIT LAYOUT L41 RESIDENTIAL 8 UNIT LAYOUT L42 RESIDENTIAL 8 UNIT LAYOUT L43 RESIDENTIAL 8 UNIT LAYOUT L44 RESIDENTIAL 6 UNIT LAYOUT L45 RESIDENTIAL 6 UNIT LAYOUT L46 RESIDENTIAL 6 UNIT LAYOUT L47 RESIDENTIAL 6 UNIT LAYOUT L48 RESIDENTIAL 6 UNIT LAYOUT L49 RESIDENTIAL 8 UNIT LAYOUT L40 RESIDENTIAL 6 UNIT LAYOUT L51 RESIDENTIAL 4 UNIT LAYOUT L52 RESIDENTIAL 4 UNIT LAYOUT L53 RESIDENTIAL 6 UNIT LAYOUT L50 RESIDENTIAL 2 UNIT LAYOUT L54 RESIDENTIAL 2 UNIT LAYOUT L55 Max Building Height TOWER 2 649' - NGVD Max Building Height TOWER 1 649' - NGVD L56 MEP MEP L56 67'-4"10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 65 ' - 6 " 166'-1"10 ' - 9 " 176'-10" 15 0 ' - 6 " 76 ' - 3 " 599'-1" 14 ' - 0 " 627'-1" 28 ' - 0 " 58 1 ' - 8 " 21 ' - 1 1 " 649'-0" 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " 100'-7" 327'-4" 576'-7" 22 ' - 6 " 17 3 ' - 0 " 33 ' - 3 " 500'-4" 613'-1" 587'-4" 564'-10" 554'-1" 543'-4" 532'-7" 521'-10" 511'-1" 488'-7" 477'-10"477'-10" 467'-1" 456'-4" 445'-7" 434'-10" 424'-1" 413'-4" 402'-7" 391'-10" 381'-1" 370'-4" 359'-7" 348'-10" 338'-1" 316'-7" 305'-10" 295'-1" 284'-4" 273'-7" 262'-10" 252'-1" 241'-4" 226'-7" 215'-10" 205'-1" 198'-4" 187'-7" 154'-4" 143'-7" 132'-10" 122'-1" 111'-4" 88'-10" 78'-1" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " 13 ' - 0 " 71 ' - 4 " 4' - 0 " 26'-0" 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" See Elevation sheets 200s See Elevation sheets 200s 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 21 5 ' - 0 " 13 0 ' - 0 " 24 ' - 1 1 " 28 ' - 0 " 58 1 ' - 8 " 649'-0" 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " 14 ' - 0 " 16 1 ' - 3 " 624'-1" 596'-1" 67'-4" 228'-7" 443'-7" 466'-1" 22 ' - 6 " 78'-1" 88'-10" 99'-7" 110'-4" 121'-1" 131'-10" 142'-7" 153'-4" 164'-1" 174'-10" 185'-7" 196'-4" 207'-1" 217'-10" 239'-4" 250'-1" 260'-10" 271'-7" 282'-4" 293'-1" 303'-10" 314'-7" 325'-4" 336'-1" 346'-10" 357'-7" 368'-4" 379'-1" 389'-10" 400'-7" 411'-4" 422'-1" 432'-10" 454'-4" 476'-10" 487'-7" 498'-4" 509'-1" 519'-10" 530'-7" 541'-4" 552'-1" 562'-10" 573'-7" 584'-4" 610'-1" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " 13 ' - 0 " 71 ' - 4 " 4' - 0 " NGVD 26'-0" 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.010.02 ODP 08/12/2015 N/A CL GENERAL NOTES PROJECT DATA NORTH TOWER (TOWER 2)SOUTH TOWER (TOWER 1) 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 4BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 3BEDROOMS 4BEDROOMS 1BEDROOMS 3BEDROOMS 4BEDROOMS 1BEDROOMS 3BEDROOMS 4BEDROOMS 1BEDROOMS 3BEDROOMS 4BEDROOMS 1BEDROOMS 3BEDROOMS 4BEDROOMS 1BEDROOMS 3BEDROOMS 4BEDROOMS 1BEDROOMS 3BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS 4BEDROOMS PH (5 BEDROOMS) PH (5 BEDROOMS) 3BED 2BED 2BED 2BED 2BED 2BED 3BED 2BED 2BED 1BED 2BED 1BED 1BED 1BED 1BED 3BED 2BED 2BED 2BED 2BED 2BED 3BED 2BED 2BED 1BED 2BED 1BED 1BED 1BED 1BED 3BED 2BED 2BED 2BED 2BED 2BED 3BED 2BED 2BED 1BED 2BED 1BED 1BED 1BED 1BED 3BED 2BED 2BED 2BED 2BED 2BED 3BED 2BED 2BED 1BED 2BED 1BED 1BED 1BED 1BED 3BED 2BED 2BED 2BED 2BED 2BED 3BED 2BED 2BED 1BED 2BED 1BED 1BED 1BED 1BED 3BED 2BED 2BED 2BED 2BED 2BED 3BED 2BED 2BED 1BED 2BED 1BED 1BED 1BED 1BED 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 HOTEL UNITS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 4BEDROOMS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 4BEDROOMS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 4BEDROOMS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 4BEDROOMS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 4BEDROOMS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 4BEDROOMS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 1BEDROOMS 3BEDROOMS 3BEDROOMS 1BEDROOMS 2BEDROOMS 3BEDROOMS 4BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 4BEDROOMS 4BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 4BEDROOMS 4BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 4BEDROOMS 4BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 4BEDROOMS 4BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 4BEDROOMS 4BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 4BEDROOMS 4BEDROOMS 2BEDROOMS 3BEDROOMS 3BEDROOMS 2BEDROOMS 4BEDROOMS 5BEDROOMS 4BEDROOMS 4BEDROOMS 5BEDROOMS 5BEDROOMS 4BEDROOMS 4BEDROOMS 5BEDROOMS PH (5 BEDROOMS)PH (5 BEDROOMS) PH (5 BEDROOMS)PH (5 BEDROOMS) COOLING TOWERCOOLING TOWER 1.ALL ELEVATIONS ON NGVD UNIT DISTRIBUTION AP P L I C A T I O N F O R T R A N S F E R O F D E V E L O P M E N T R I G H T S PR O P O S E D F L O O R A R E A R A T I O 5 . 9 8 , D E N S I T Y 1 1 0 U N I T S / A C R E , P E R C E N T A G E O F R I G H T S T O B E R E C E I V E D 3 0 % OR 2 8 3 , 4 8 5 . 1 2 S Q U A R E F E E T . OR F R O M L E V E L 4 3 T O L E V E L 5 5 O N B O T H T O W E R 1 A N D T O W E R 2 AS O F R I G H T W I T H O U T T D R s FA R R A T I O O F 4 . 6 4BEDROOMS 3BEDROOMS 1 0 ' - 0 " M A X . P A R K I N G S T R U C T U R E E N C R O A C H M E N T A N D C O L L I N S L A N D S C A P E E A S E M E N T daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.010.03 UNS 11/02/2015 PARALLEL TO COLLINS ELEVATION W/ 75' 1.ALL ELEVATIONS ON NGVD COLLINS AVENUE (A1A) SEPARATION 75'-0" SEPARATION BETWEEN BUILDINGS STRUCTURES 75'-0" SEPARATION BETWEEN BUILDINGS STRUCTURES ZONING DISTRICT REQUIREMENT: SEC 265-35 D (5)MINIMUN SEPARATION BETWEEN BUILDINGS 75'-0" 1/64"= 1'-0" 75'-0" SEPARATION BETWEEN BUILDINGS STRUCTURES TOWER 1TOWER 2 TOWER 1 TOWER 2 BEACH ATLANTIC OCEAN SEE GENERAL NOTES AND PROJECT DATA. SHEET A-0.010.00 FOR ENLARGED ELEVATION SEE SHEET A-0.201.00 SEE SITE PLAN FOR PROPERTY CASEMENT AND SETBACKS DESCRIOTIONS. SHEET A-0.050.00 FLOORS BELOW FLOORS BELOW FLOORS BELOW FLOORS BELOW TOWER 1 TOWER 2 60 ' - 0 " EDGE OF 7'-6" BALCONY EDGE OF 7'-6" BALCONY 1 1 1 1 1 1 1 U P U P L e v e l 1 E L E V . + 1 5 ' - 8 " D N D N Ram p 1 : 1 2 D N R R R R R R R R R R R R R R R R R R R R R R R R R R R R R R RRRRRRRR R R R R R R R R R R RR RRRRRRRR R R R R R R R R R R RR RRRR R R C N C N C N C N C N C N C U C N C N B S C U C U C U C U C N C N C N C N C N C N C N C N C N C N C N C N B S B B B S C U C U B B B B C N C N C U B S C U B S C U C U C N C N C N C N C N C N C N C N C N C N C N C N C N C U C U C U C U C U C U 300'-0" 300'-0"A1A COLLINS AVE.NORTH BOUND Collins Ave+6' 0" NGVDA1A COLLINS AVE.SOUTH BOUND A1A COLLINS AVE.SOUTH BOUNDRAMP TO LEHMAN CSWY A1A COLLINS AVE. NORTH BOUND TRAFFIC OVERHEAD SIGNAGE ATLANTIC OCEAN STREET LIGHTSOUT H N E I G H B O R E N T R A N C E N O R T H N E I G H B O R E N T R A N C E 7 5 ' - 0 " 5 0 ' - 0 " 1 0 ' - 0 " 7 5 ' - 0 " 50' - 0 " 10'-0" 7 5 ' - 0 " F R O N T S E T B A C K 5 0 ' - 0 " P O R T E - C O C H E R E P E R M I T T E D S E T B A C K 1 0 ' - 0 " M A X P A R K I N G S T R U C T U R E E N C R O A C H M E N T T O W E R S E T B A C K T O W E R S E T B A C K 300'-0" 4 7 0 ' - 0 " 433'-4" 4 7 4 ' - 2 " P H A S E 2 T O W E R 2 P H A S E 1 T O W E R 1 B E A C H A C C E S S 20'-0" 25'-0"25'-0" 26'-0" 26'-0"210'-0" P R O P E R T Y L I N E P R O P E R T Y L I N E PROPERTY LINE PROPERTY LINE COASTAL CONSTRUCTI O N L I N E COASTAL CONSTRUCTION LINE MAX PARKINGSTRUCTURE ENCROACHMENT PORTE-COCHERE PERMITTED SETBA C K FRONT SETBACK MAX PARKING STRUCTURE ENCROACHMENT PORTE-COCHERE PERMITTED SETB A C K FRONT SETBACK BULKHEAD LINE BULKHEAD LINE PROPERTY LIN E PROPERTY LINE S E R V I C E R O A D B E A C H E A S E M E N T 1 0 ' - 0 " M A X . P A R K I N G S T R U C T U R E E N C R O A C H M E N T A N D C O L L I N S L A N D S C A P E E A S E M E N T 1 0 ' - 0 " M A X . P A R K I N G S T R U C T U R E E N C R O A C H M E N T A N D C O L L I N S A V E . L A N D S C A P E E A S E M E N T COLLINS LANDSC A P E EASEMENT 75'-0" TO BALCONY SL A B EXTENSION SEE SHEET A-0.010.0 3 9 1 ' - 1 " 1 1 5 ' - 9 " 26'-6" 150'-7"EXISTING DRIVEWAY TO EXISTING 148'-7" 1 0 1 ' - 4 " 8 2 ' - 0 " EXISTING DRIVEWAY TO EXISTING DRIVEWAY 50'-0" REQD EXISTING DRIVEWAY TO EXISTING DRIVEWAY 5 0 ' - 0 " R E Q D 57'-11"39'-2"163'-9" DRIVEWAY 50'-0" REQD d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 E d w a r d A n d r e w O ' D o n n e l l F L . A r c h i t e c t R e g . N o : A R 9 3 5 3 3 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t 3 3 3 H U D S O N S T R E E T , S U I T E 9 0 5 N E W Y O R K , N Y 1 0 0 1 3 U S A . c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J G P E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 1 ( 2 1 2 ) 2 8 5 0 0 8 8 c l i e n t 2 8 0 1 F L O R I D A A V . S U I T E 1 8 M I A M I , F L 3 3 1 3 3 T + 1 ( 3 0 5 ) 4 6 1 9 8 5 2 S L S F I R E P R O T E C T I O N E N G I N E E R S O D P 1 1 / 0 2 / 2 0 1 5 1 / 5 0 " = 1 ' - 0 " C L A - 0 . 0 5 0 . 0 0 S I T E P L A N E D G E O F B A L C O N Y E D G E O F A R C H I T E C T U R A L F E A T U R E L E V E L 4 A M E N I T I E S E D G E O F B A L C O N Y E D G E O F A R C H I T E C T U R A L F E A T U R E P O O L S O N G R O U N D 1 . S E E S U R V E Y . E A S T P R O P E R T Y L I N E I S S A M E A S E R O S I O N C O N T R O L L I N E S . D R I V E C O U R T B E L O W L E V E L 4 A M E N I T Y C A N O P Y . . . . L E V E L 4 A M E N I T I E S P U B L I C O C E A N F R O N T P A R K A N D O P E N S P A C E E N H A N C E M E N T S B O N U S S E E S H E E T A - 0 . 0 1 0 . 0 0 T r a s h R o o m G F A T r a s h R o o m G F A T r a s h R o o m G F A F i r e L . n o n - G F A F i r e L . n o n - G F A F i r e L . n o n - G F A C i r c u l a t i o n G F A B O H G F A P a r k i n g n o n - G F A S t o r a g e n o n - G F A C i r c G F A C i r c G F A S t o r a g e n o n - G F A S t o r a g e n o n - G F A S t o r a g e n o n - G F A E m p l o y e e F a c i l i t i e s G F A S t o r a g e n o n - G F A S t o r a g e n o n - G F A S t o r a g e n o n - G F A L e g e n d P a r k i n g S p a c e s 1 = S i n g l e 2 = D o u b l e m e c h a n i c a l 3 = T r i p l e m e c h a n i c a l T 1 = T a n d e m T 2 = T a n d e m d o u b l e m e c h a n i c a l T 3 = T a n d e m t r i p l e m e c h a n i c a l = H a n d i c a p p e d a c c e s s i b l e P A R K I N G C O U N T T o t a l 1 0 2 2 B 1 9 2 4 L 1 8 5 L 2 1 3 N O T E : 1 . S E E S H E E T A - 0 . 0 1 0 . 0 0 . P A R K I N G C O U N T I S B A S E O N S H A R E D P A R K I N G R E Q U I R E M E N T S . T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2T2 T2T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2T2 T2 2 2 T2T2T2T2 T2 T2 T2 T2 T2 T2T2T2 T2 T2T2 T2T2T2 T2 T2 T2 T2T2T2 T2 T2 T2 T2T2T2 2 22222222222 2 2 2 T2 T2 2 2 2 2 T2 T2 T2 T2T2T2 T2 T2 T2T2 T2 T2 T2T2 T2T2 T2 T2 T1 T1 T2 T2 T2 T2 T2 T2 T2T2 T2T2 T2 T2 T2 T2 T3T3T3T3T3T3T3T3T3T3T3T3 T2 T2 T3T3 T2 T2 T2 T2 T3 T3 T3 T3 T3T3 T3 T3 T3 T3 T3 T3 T3 T3 T1T1T1T1T1 2 T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3 T3 T33 T3 T3T3T3T3T3T3 T3T3T3T3T3T3 T3 T3 T3T3T3 T3T3T3 T3T3T3 T3T3T3 2 2 T3T3T3 T3T3T3T3T3T3 T3T3T3T3T3T3 T3T3T3T3T3T3 T3T3T3 2222222 2 2 T2 T2 1T3 T1T1T1 T1T2T2T211 3 T2 T21111 1 2 2 T2 T2 2 2 2 2222 2 T2 T2 T2 2 2 T3 2 T3T3T3T3T3T3T3T3T3T3T3T3T3T3 1 T3T3 T3T3T3T3T3 T3T3 111111 T1T1T1T1T1T1T1T1Collins Ave+6' 0" NGVD B e a c h + 8 ' 9 " N G V D 7'-0" clear7'-0" clear 6 0 ' - 3 " 3'-0"9'-0"9'-0"9'-0"3'-0"24'-0"36'-0" 3 0 ' - 0 " 2 7 ' - 9 " 1 0 ' - 0 " 22'-0"36'-0"22'-0" 3 6 ' - 0 " 8 ' - 6 " 1 8 ' - 0 " 2 2 ' - 0 " 1 8 ' - 0 " 1 ' - 0 " 4 2 ' - 3 " 2 3 ' - 3 " 1 8 ' - 0 " 3 6 ' - 0 " TOWER SETBACKTOWER SETBACK BEACH ACCESS PROPERTY LINEPROPERTY LINE PROPERTY LINEPROPERTY LINE COASTAL CONSTRUCTI O N L I N E COASTAL CONSTRUCTIO N L I N E MAX PARKINGSTRUCTURE ENCROACHMENTPORTE-COCHEREPERMITTED SETBACKFRONT SETBACK MAX PARKINGSTRUCTURE ENCROACHMENTPORTE-COCHEREPERMITTED SETBACKFRONT SETBACK BULKHEAD LINE BULKHEAD LINE PROPERTY LIN E PROPERTY LINE SERVICE ROAD COLLINS LANDSCAPE EASEMENT TO BALCONY SL A B E X T E N S I O N SEE SHEET A-0.0 1 0 . 0 3 2 8 ' - 0 " 2 2 ' - 0 " 2 2 ' - 0 " 22'-0" 21'-10" 23'-3"22'-0"24'-0"22'-0"22'-0"22'-0"23'-2" 2 3 ' - 2 " 25'-0" 25'-0" 25'-0" 2 3 ' - 3 " 23'-4" 17'-5"26'-0"18'-2" 2 2 ' - 0 " 2 2 ' - 0 " H e i l D u r a P a c k 5 0 0 0 T S E X T - R e f u s e C o l l e c t i o n Heil DuraPack 5000TSEXT - Refuse Collection H e i l D u r a P a c k 5 0 0 0 T S E X T - R e f u s e C o l l e c t i o n H e i l D u r a P a c k 5 0 0 0 T S E X T - R e f u s e C o l l e c t i o n d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 E d w a r d A n d r e w O ' D o n n e l l F L . A r c h i t e c t R e g . N o : A R 9 3 5 3 3 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t 3 3 3 H U D S O N S T R E E T , S U I T E 9 0 5 N E W Y O R K , N Y 1 0 0 1 3 U S A . c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J G P E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 1 ( 2 1 2 ) 2 8 5 0 0 8 8 c l i e n t 2 8 0 1 F L O R I D A A V . S U I T E 1 8 M I A M I , F L 3 3 1 3 3 T + 1 ( 3 0 5 ) 4 6 1 9 8 5 2 S L S F I R E P R O T E C T I O N E N G I N E E R S A - 0 . 1 0 0 . 0 0 1 1 / 0 2 / 2 0 1 5 1 " = 2 0 ' - 0 " R Y B A S E M E N T L E V E L B 1 U N S / O D P O U T L I N E O F P O O L A B O V E 1 . D R I N A G E F O R L E V E L S B 1 , 0 1 , A N D 0 2 W I L L B E A D D R E S S E D I N T H E B U I L D I N G P E R M I T D R A W I N G S . TRENCH DRAIN T o i l e t s G F A L i f t L o b b y G F A A m e n i t i e s G F A A m e n i t i e s G F A 3 - M e a l R e s t a u r a n t G F A B O H G F A L i f t L o b b y G F A L i f t L o b b y G F A C o r r i d o r G F A B O H G F A A m e n i t i e s G F A A m e n i t i e s G F A L i f t L o b b y G F A C i r c u l a t i o n G F A C o r r i d o r G F A C o r r i d o r G F A C o r r i d o r G F A C i r c u l a t i o n G F A F i r e L . n o n - G F A F i r e P u m p R o o m n o n - G F A T e c h n o n - G F A F i r e L . n o n - G F A S t o r a g e n o n - G F A T V / P h o n e n o n - G F A D o m e s t i c P u m p n o n - G F A S w i t c h G e a r R o o m n o n - G F A F P L V a u l t n o n - G F A F i r e P u m p R o o m n o n - G F A S t o r a g e n o n - G F A F i r e L . n o n - G F A P a r k i n g n o n - G F A E g r e s s n o n - G F A E g r e s s n o n - G F A E g r e s s n o n - G F A B O H G F A G e n e r a t o r R o o m 2 n o n - G F A G e n e r a t o r R o o m 1 n o n - G F A F u e l T a n k n o n - G F A D o m e s t i c P u m p R o o m n o n - G F A F P L V a u l t n o n - G F A S w i t c h G e a r R o o m n o n - G F A S t o r a g e n o n - G F A Storagenon-GFA Storagenon-GFA 2 , 4 0 4 S Q . F T . Collins Ave+6' 0" NGVD B e a c h + 8 ' 9 " N G V D 5'-0" E L . E L . S . E L . S T R . U P D N E L . E L . S . E L . E L . S . E L . E L . H . E L . H . E L . H . E L . E L . E L . E L . S . E L . E L . E L . D N D N U P U P S T R . S T R . L1 ParkingEntrance10'-0"Ramp 14%7% blend7% blend UPUPR15'-0"UP Ramp 14%Level 1ELEV. +15'-8"Level 1ELEV. +15'-8" L e v e l 1 E L E V . + 1 5 ' - 8 " Level 1ELEV. +15'-8" L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " 8 ' - 7 " 9 ' - 0 " 8 ' - 9 " 8 ' - 1 " 7 ' - 7 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " 6'-0"6'-0"6'-0"7% blend 7% blendRamp 14%DN L e g e n d p a r k i n g s p a c e s 1 = S i n g l e p a r k i n g s p a c e 2 = S i n g l e m e c h a n i c a l p a r k i n g s p a c e T 1 = T a n d e m p a r k i n g s p a c e s T 2 = T a n d e m m e c h a n i c a l p a r k i n g s p a c e s 36'-0"24'-0" 1 8 ' - 0 " 18'-0"24'-0" 1 8 ' - 0 " 3 6 ' - 0 " 2 4 ' - 0 " L1 ParkingEntrance 5 ' - 0 " 18'-5" L e v e l 1 E L E V . + 1 5 ' - 8 " ChamferELEV. +12'-0"87'-10" a r e a t h i c k n e s s o f d e c k c o n s t r u c t i o n m a x . 2 ' 8 " t o t a l , i n c l u d i n g f i n i s h e s , a l s o s e e s e c t i o n s S K 1 - 0 2 0 . 10'-0"DN UPRamp 14%7% blend 10'-0"10'-0"10'-0"Ramp Beach Easement1:20 Slope D N L e v e l 1 E L E V . + 1 5 ' - 8 " UPGradeELEV. +6'-0" D N UP C h a m f e r E L E V . + 1 2 ' - 0 " Ramp1:20 Slope D N UP25'-0" 25'-0" 5'-6" C h a m f e r E L E V . + 1 2 ' - 0 " C h a m f e r E L E V . + 1 2 ' - 0 " B e a c h E a s e m e n t Ramp Lenght 193'-4"Ramp Length 193'-4" 19'-6"5'-6" D N R a m p 1 6 % 8 % b l e n d DNRamp8% L 1 L 2 L 2 L 1 L 1 L 2 19'-6" beach easement min.20'-0" beach easementmin.20'-0" beach easement min.20'-0" 1 8 ' - 0 " 5 ' - 0 " 10'-0"11'-0"19'-8"6'-0" 19'-6"5'-6" UP R a m p V a l e t o n l y T1 1T1T1T1T1T1T1T1T1T1T1T1T1T1T1T1 T 1 T 1 T 1 T 1 1111 1 1 T1T1 T1 T1T1T1T1T1 T1 T1T1T1 T1 T1 T1T1T1 T1T1T1 1 T 1 T 1 T1T1 T1T1 T1T1 T1T1 T1T1T1T1 T1 T1 L1 ParkingEntrance10'-0"Ramp 14%7% blend7% blend UPUPR15'-0"UP Ramp 14%Level 1ELEV. +15'-8"Level 1ELEV. +15'-8" L e v e l 1 E L E V . + 1 5 ' - 8 " Level 1ELEV. +15'-8" L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " 8 ' - 7 " 9 ' - 0 " 8 ' - 9 " 8 ' - 1 " 7 ' - 7 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " 6'-0"6'-0"6'-0"7% blend 7% blendRamp 14%DN L e g e n d p a r k i n g s p a c e s 1 = S i n g l e p a r k i n g s p a c e 2 = S i n g l e m e c h a n i c a l p a r k i n g s p a c e T 1 = T a n d e m p a r k i n g s p a c e s T 2 = T a n d e m m e c h a n i c a l p a r k i n g s p a c e s 36'-0"24'-0" 1 8 ' - 0 " 18'-0"24'-0" 1 8 ' - 0 " 3 6 ' - 0 " 2 4 ' - 0 " L1 ParkingEntrance 5 ' - 0 " 18'-5" L e v e l 1 E L E V . + 1 5 ' - 8 " ChamferELEV. +12'-0"87'-10" a r e a t h i c k n e s s o f d e c k c o n s t r u c t i o n m a x . 2 ' 8 " t o t a l , i n c l u d i n g f i n i s h e s , a l s o s e e s e c t i o n s S K 1 - 0 2 0 . 10'-0"DN UPRamp 14%7% blend 10'-0"10'-0"10'-0"Ramp Beach Easement1:20 Slope D N L e v e l 1 E L E V . + 1 5 ' - 8 " UPGradeELEV. +6'-0" D N UP C h a m f e r E L E V . + 1 2 ' - 0 " Ramp1:20 Slope D N UP25'-0" 25'-0" 5'-6" C h a m f e r E L E V . + 1 2 ' - 0 " C h a m f e r E L E V . + 1 2 ' - 0 " B e a c h E a s e m e n t Ramp Lenght 193'-4"Ramp Length 193'-4" 19'-6"5'-6" D N R a m p 1 6 % 8 % b l e n d DNRamp8% L 1 L 2 L 2 L 1 L 1 L 2 19'-6" beach easement min.20'-0" beach easementmin.20'-0" beach easement min.20'-0" 1 8 ' - 0 " 5 ' - 0 " 10'-0"11'-0"19'-8"6'-0" 19'-6"5'-6" UP R a m p V a l e t o n l y TOWER SETBACKTOWER SETBACK BEACH ACCESS PROPERTY LINEPROPERTY LINE PROPERTY LINEPROPERTY LINE COASTAL CONSTRUCTIO N L I N E COASTAL CONSTRUCTIO N L I N E MAX PARKINGSTRUCTURE ENCROACHMENTPORTE-COCHEREPERMITTED SETBACKFRONT SETBACK MAX PARKINGSTRUCTURE ENCROACHMENTPORTE-COCHEREPERMITTED SETBACKFRONT SETBACK BULKHEAD LINE BULKHEAD LINE PROPERTY LIN E PROPERTY LINE SERVICE ROAD COLLINS LANDSCAPE EASEMENT TO BALCONY SL A B E X T E N S I O N SEE SHEET A-0.0 1 0 . 0 3 2 4 ' - 0 " 24'-0"24'-0"24'-0"24'-0"24'-0" 35'-1" 26'-6" d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 E d w a r d A n d r e w O ' D o n n e l l F L . A r c h i t e c t R e g . N o : A R 9 3 5 3 3 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t 3 3 3 H U D S O N S T R E E T , S U I T E 9 0 5 N E W Y O R K , N Y 1 0 0 1 3 U S A . c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J G P E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 1 ( 2 1 2 ) 2 8 5 0 0 8 8 c l i e n t 2 8 0 1 F L O R I D A A V . S U I T E 1 8 M I A M I , F L 3 3 1 3 3 T + 1 ( 3 0 5 ) 4 6 1 9 8 5 2 S L S F I R E P R O T E C T I O N E N G I N E E R S A - 0 . 1 0 1 . 0 0 1 1 / 0 2 / 2 0 1 5 1 " = 2 0 ' - 0 " R Y L E V E L 0 1 U N S / O D P S T A I R S A B O V E R A M P T O L E V E L B 1 1 . D R A I N A G E F O R L E V E L S B 1 , 0 1 , A N D 0 2 W I L L B E A D D R E S S E D I N T H E B U I L D I N G P E R M I T D R A W I N G S . TRENCH DRAIN TRENCH DRAINTRENCH DRAIN 1 1 1 1 1 1 1 UP UP Level 1 ELEV. +15'-8" DN DN Ra m p 1 : 1 2 DN RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RR RRRR RR CNCN C N CNCN C N CU C N C N BS CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN BS BB BS CU CU BB BB CN CN CU BS CU BS CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU CU MEP non-GFA AMENITIES GFA MEP non-GFA Resi Lobby GFA AMENITIES GFA Lift Lobby GFA Fire L. non-GFA Circulation GFA FCC non-GFA Amenities GFA BOH GFA Specialty Restaurant GFA Corridor GFA BOH GFA Lift Lobby GFA Lift Lobby GFA Amenities GFA MEP non-GFA Amenities GFA Resi Lobby GFA Fire L. non-GFA Fire L. non-GFA Hotel Lobby GFA Stair GFA Stair GFA Stair GFA BOH GFA Lobby Lounge GFA BOH GFA BOH GFA 2,372 SQ.FT. 1,177 SQ.FT. Collins Ave +6' 0" NGVD Beach +8' 9" NGVD UP UP R a m p 1 4 % Ra m p 1 4 % 7% b l e n d 7% b l e n d 7% blend Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" DN Level 2 ELEV. +26'-0" DN FIRE ENGINE SET-UP SITE B FIRE ENGINE SET-UP SITE A L2 L3 L2 Level 2 ELEV. +26'-0" Level 2 ELEV. +27'-8" Level 2 ELEV. +27'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +27'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" 19'-8" 24'-0" Ram p 1 : 1 2 DN DN TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 1 1 1 1 1 1 1 1 1 1 EL. S.EL. EL. S.EL. EL. H.EL. H.EL. H.EL.EL. EL. EL. S.EL. EL. EL. DN DN UP UP UP UP STR. STR. STR. STR. EL. EL. S.EL. STR. UP DN STR. UP EL. 24 ' - 0 " 24'-0" 24'-0" 12'-0" 24'- 0 " 24'- 0 " 12'- 0 " 22 ' - 6 " 24'- 0 " 12'-0" 24'-0" 43 5 ' - 9 " O F S T R E E T F R O N T A G E 6'-0" 6'-0" daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.102.0011/02/2015 1"= 20'-0" RY LEVEL 02 GROUND UNS/ODP MONUMENTAL SIGNAGE PER SEC. 265-56A MAXIMUM 78 SF MAX HEIGHT 15' INCLUDING PEDESTAL ALL SIGNS TO MEET THE SIGHT SAFETY TRIANGLE REQUIREMENTS. PEDESTAL CANNOT BE MORE THAN 50% OF TOTAL SIGN HEIGHT AND MUST BE FULLY SCREENED WITH LANDSCAPE MATERIAL RIGHT HAND TURN ONLY SEE CIVIL DRAWINGS 1. DRAINAGE FOR LEVELS B1, 01, AND 02 WILL BE ADDRESSED IN THE BUILDING PERMIT DRAWINGS. TRENCH DRAIN TRENCH DRAIN TRENCH DRAIN HANDICAPPED ACCESSIBLE ELEVATOR HANDICAPPED ACCESSIBLE ELEVATOR MONUMENTAL SIGNAGE PER SEC. 265-56A MAXIMUM 78 SF MAX HEIGHT 15' INCLUDING PEDESTAL ALL SIGNS TO MEET THE SIGHT SAFETY TRIANGLE REQUIREMENTS. PEDESTAL CANNOT BE MORE THAN 50% OF TOTAL SIGN HEIGHT AND MUST BE FULLY SCREENED WITH LANDSCAPE MATERIAL 5'-0" Collins Ave +6' 0" NGVD Beach +8' 9" NGVD Amenities GFA Amenities GFA Amenities GFA Lift Lobby GFA Fire L. non-GFA Fire L. non-GFA Fire L. non-GFA Pre-function GFA MEETING & EVENT VENUE GFA Toilets GFA Toilets GFA Lift Lobby GFA Lift Lobby GFA Circulation GFA Amenities GFA Ou t d o o r G a l l e r y T e r r a c e no n - G F A BOH GFA Stair GFA Stair GFA Stair GFA 9,034 SQ. FT. EL. EL. S.EL. STR. UP DN EL. EL. S.EL. EL.S.EL. EL. H.EL. H.EL. H.EL.EL. EL. EL. S.EL.EL. EL. DN DN UP UP STR. STR. Void Level 3 ELEV. +42'-4" Level 3 ELEV. +42'-4" L1 L2L3 L3 L2 L3 UP Void Void Void Void L2 1 1 1 1 1 1 1 1 1 1 TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.103.0011/02/2015 LEVEL 03 1"= 20'-0" RY UNS/ODP 1. DRAINAGE FOR LEVELS B1, 01, AND 02 WILL BE ADDRESSED IN THE BUILDING PERMIT DRAWINGS. 1 1 1 1 1 1 1 1 1 1 5'-0" Evening Pool Evening Deck Evening Pool Evening Deck Void Level 4 ELEV. +54'-4" Level 4 ELEV. +54'-4" Level 4 ELEV. +54'-4" Level 4 ELEV. +54'-4" Venue double height L3 L4 L3 L4 L4 L3 Void Void Void Void Collins Ave +6' 0" NGVD Beach +8' 9" NGVD TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 Amenities GFA MEP non-GFA Amenities GFA Amenities GFA Amenity GFA Fitness - Recreational GFA Fire L. non-GFA Circulation GFA Toilets GFA Fire L. non-GFA Fire L. non-GFA BOH GFA Lift Lobby GFA Lift Lobby GFA Circ GFA MEP non-GFA Outdoor non-GFA Amenities GFA Amenities GFA Lift Lobby GFA Stair GFA Stair GFA Stair GFA Amenities GFA BOH GFA Fitness - Lockers - Showers GFA 4,847 SQ.FT. EL. EL. S.EL. STR. UP DN EL. EL. S.EL. EL.S.EL. EL. H.EL. H.EL. H.EL.EL. EL. EL. S.EL.EL. EL. DN DN UP UP STR. STR. Level 4 ELEV. +54'-4" Level 4 ELEV. +54'-4" Level 4 ELEV. +54'-4" Level 3 ELEV. +42'-4" Level 4 ELEV. +54'-4" Level 4 ELEV. +54'-4" daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.104.0011/02/2015 1"= 20'-0" RY LEVEL 04 UNS/ODP 1. DRAINAGE FOR LEVELS B1, 01, AND 02 WILL BE ADDRESSED IN THE BUILDING PERMIT DRAWINGS. TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 1 1 1 1 1 1 1 1 1 1 5'-0" sf Lift Lobby and Corridor (GFA) 3079.61523255 GFA EL. STR. UP DN EL. S.EL. S.EL. EL. EL.H.EL. H.EL. H.EL. EL. EL. S.EL. EL. EL. STR. UP DN STR. UP DN STR. UP DN sf Elev, Stairs, MEP etc. 2087.66738111 Non GFA sf Elev, Stairs, MEP etc. 1579.35492920 Non GFA Collins Ave +6' 0" NGVD Beach +8' 9" NGVD 5-A 5-B 5-D 5-C 5-E 5-F 5-G 5-H 5-Q 5-P 5-M 5-N 5-L 5-K 5-J 5-I 5-S 5-U 5-T 5-R UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT IDUNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID 5-X, 3BR 5-Y, 1BR 5-Z, 4BR UNIT ID UNIT ID UNIT ID STR. UP DN EL. sf Elev, Stairs, MEP etc. 1449.14583333 Non GFA EL. EL. S.EL. STR. UP DN daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.105.0008/12/2015 1"= 20'-0" RY L05 TO L7 TOWER1 TYP HOTEL TOWER2 TYP RESI 3UNIT UNS/ODP 1.For elevation mark see elevation sheets. A-0.201.00 to A-0.204.00 TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 1 1 1 1 1 1 1 1 1 1 5'-0" Collins Ave +6' 0" NGVD Beach +8' 9" NGVD 8-A 8-B 8-D 8-C 8-E 8-F 8-G 8-H 8-P 8-M 8-N 8-L 8-K 8-J 8-I UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID sf Lift Lobby and Corridor (GFA) 2865.88863889 GFA EL. STR. UP DN EL. S.EL. S.EL. EL. EL.H.EL. H.EL. H.EL. EL. EL. S.EL. EL. EL. STR. UP DN STR. UP DN STR. UP DN sf Elev, Stairs, MEP etc. 2087.66738111 Non GFA sf Elev, Stairs, MEP etc. 1579.35492920 Non GFA 5-X, 3BR 5-Y, 1BR 5-Z, 4BR UNIT ID UNIT ID UNIT ID STR. UP DN EL. sf Elev, Stairs, MEP etc. 1449.14583333 Non GFA EL. EL. S.EL. STR. UP DN daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.108.0008/12/2015 1"= 20'-0" RY L08 TO L13 TOWER1 TYP APT. HOTEL TOWER2 TYP RESI 3UNIT UNS/ODP 5'-0" 1 1 1 1 1 1 1 1 1 1 TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 EL. STR. UP DN EL. S.EL. EL. EL. EL. EL. S.EL. EL. EL. STR. UP DN STR. UP DN STR. UP DN sf Elev, Stairs, MEP etc. #### Non GFA sf Elev, Stairs, MEP etc. #### Non GFA sf Corridor 286.00000000 GFA sf Corridor 286.00000000 GFA Collins Ave +6' 0" NGVD Beach +8' 9" NGVD 21-X, 3BR 21-Y, 1BR 21-Z, 4BR UNIT ID UNIT ID UNIT ID STR. UP DN EL. sf Elev, Stairs, MEP etc. 1449.14583333 Non GFA EL. EL. S.EL. STR. UP DN FLOOR MECH. daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.114.0008/12/2015 1"= 20'-0" RY TOWER1 MEP TOWER2 TYP RESI 3UNIT L14 UNS/ODP 5'-0" 1 1 1 1 1 1 1 1 1 1 TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 EL. STR. UP DN EL. S.EL. EL. EL. EL. EL. S.EL. EL. EL. STR. UP DN STR. UP DN STR. UP DN sf Elev, Stairs, MEP etc. #### Non GFA sf Elev, Stairs, MEP etc. #### Non GFA sf Corridor 286.00000000 GFA sf Corridor 286.00000000 GFA 16-A, 3BR 16-B, 2BR 16-D, 3BR 16-C, 1BR 16-E, 3BR 16-F, 1BR 16-G, 2BR 16-H, 4BR UNIT ID UNIT IDUNIT ID UNIT ID UNIT ID UNIT IDUNIT ID UNIT ID Collins Ave +6' 0" NGVD Beach +8' 9" NGVD 21-X, 3BR 21-Y, 1BR 21-Z, 4BR UNIT ID UNIT ID UNIT ID STR. UP DN EL. sf Elev, Stairs, MEP etc. 1449.14583333 Non GFA EL. EL. S.EL. STR. UP DN daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.115.0008/12/2015 1"= 20'-0" RY TOWER1 TYP RESI 8UNIT TOWER2 TYP RESI 3UNIT L15 TO L44 UNS/ODP Collins Ave +6' 0" NGVD Beach +8' 9" NGVD 5'-0" 1 1 1 1 1 1 1 1 1 1 EL. STR. UP DN EL. S.EL. EL. EL. EL. EL. S.EL. EL. EL. STR. UP DN STR. UP DN STR. UP DN sf Elev, Stairs, MEP etc. #### Non GFA sf Elev, Stairs, MEP etc. #### Non GFA sf Corridor 286.00000000 GFA sf Corridor 286.00000000 GFA 53-X, 4BR 53-Y, 4BR UNIT ID UNIT ID STR. UP DN EL. sf Elev, Stairs, MEP etc. 1449.14583333 Non GFA EL. EL. S.EL. STR. UP DN 51-A 51-B 51-D 51-C 51-E 51-F UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID UNIT ID TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.145.0008/12/2015 1"= 20'-0" RY L45 TO L51 TOWER1 TYP RESI 6UNIT TOWER2 TYP RESI 2UNIT UNS/ODP 5'-0"5'-0" Collins Ave +6' 0" NGVD Beach +8' 9" NGVD 1 1 1 1 1 1 1 1 1 1 EL. STR. UP DN EL. S.EL. EL. EL. EL. EL. S.EL. EL. EL. STR. UP DN STR. UP DN STR. UP DN sf Elev, Stairs, MEP etc. #### Non GFA sf Elev, Stairs, MEP etc. #### Non GFA sf Corridor 286.00000000 GFA sf Corridor 286.00000000 GFA 53-X, 4BR 53-Y, 4BR UNIT ID UNIT ID STR. UP DN EL. sf Elev, Stairs, MEP etc. 1449.14583333 Non GFA EL. EL. S.EL. STR. UP DN TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 52-A 4,315 52-D 4,290 52-C 3,545 52-B 3,430 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.152.0008/12/2015 1"= 20'-0" RY L52 TO L53 TOWER1 TYP RESI 4 UNIT TOWER2 TYP RESI 2 UNIT UNS/ODP 5'-0" Collins Ave +6' 0" NGVD Beach +8' 9" NGVD 5'-0" 1 1 1 1 1 1 1 1 1 1 54-A 54-B UNIT ID UNIT ID EL. STR. UP DN EL. S.EL. EL. EL. EL. EL. S.EL. EL. EL. STR. UP DN STR. UP DN STR. UP DN sf Elev, Stairs, MEP etc. #### Non GFA sf Elev, Stairs, MEP etc. #### Non GFA sf Corridor 286.00000000 GFA sf Corridor 286.00000000 GFA 54-X, PH UNIT ID STR. UP DN EL. sf Elev, Stairs, MEP etc. 1449.14583333 Non GFA EL. EL. S.EL. STR. UP DN TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.154.00 UNS/ODP 08/12/2015 1"= 20'-0" RY PENTHOUSE L54 TO L55 5'-0" 1 1 1 1 1 1 1 1 1 1 Collins Ave +6' 0" NGVD Beach +8' 9" NGVD SCREEN SCREEN TOWER SETBACK TOWER SETBACK BEACH ACCESS PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E CO A S T A L C O N S T R U C T I O N L I N E CO A S T A L C O N S T R U C T I O N L I N E MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MA X P A R K I N G ST R U C T U R E E N C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K BU L K H E A D L I N E BU L K H E A D L I N E PR O P E R T Y L I N E PR O P E R T Y L I N E SERVICE ROAD 10'-0" MAX. PARKING STRUCTURE ENCROACHMENT AND CO L L I N S L A N D S C A P E E A S E M E N T TO B A L C O N Y S L A B E X T E N S I O N SE E S H E E T A - 0 . 0 1 0 . 0 3 TOP OF COOLING TOWER ELEV. +649'-0" NGVD TOP OF COOLING TOWER ELEV. +649'-0" NGVD daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.156.00 UNS 08/12/2015 1"= 20'-0" RY ROOF PLAN COOLING TOWER COOLING TOWER COOLING TOWER 67'-4"10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 65 ' - 6 " 166'-1"10 ' - 9 " 176'-10" Hotel 3 Floors M.E.P. 1 Floor 15 0 ' - 6 " 8 Units per floor Twist 14 Floors 76 ' - 3 " 599'-1" 6 Units per floor 7 Floors 14 ' - 0 " 627'-1" 28 ' - 0 " 58 1 ' - 8 " 2 Penthouses per floor 2 Floors 21 ' - 1 1 " MEP 1 Floor 649'-0" L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L21 L22 L23 L24 L25 L26 L27 L28 L29 L20 L31 L32 L33 L34 L35 L36 L37 L38 L39 L30 L41 L42 L43 L44 L45 L46 L47 L48 L49 L40 L51 L50 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " Max Building Height L5 L6 100'-7" Condotel 6 Floors 327'-4" 576'-7" 4 Suites per floor 2 Floors22 ' - 6 " 8 Units per floor 16 Floors 17 3 ' - 0 " 33 ' - 3 " L52 L53 L54 L55 L56 500'-4" 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 21 5 ' - 0 " 3 Units per floor 15 Floors 3 Units per floor Twist 20 Floors 13 0 ' - 0 " 2 Unis per floor 12 Floors 24 ' - 1 1 " 28 ' - 0 " 58 1 ' - 8 " 1 Penthouse per floor 2 Floors MEP 1 Floor 649'-0" 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " 14 ' - 0 " Max Building Height L5 L6 16 1 ' - 3 " L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L53 L55 624'-1" 596'-1" 67'-4" 228'-7" 443'-7" L56 L54 L52 L36 L22 466'-1" 3 Units per floor 2 Floors22 ' - 6 " 78'-1" 88'-10" 99'-7" 110'-4" 121'-1" 131'-10" 142'-7" 153'-4" 164'-1" 174'-10" 185'-7" 196'-4" 207'-1" 217'-10" 239'-4" 250'-1" 260'-10" 271'-7" 282'-4" 293'-1" 303'-10" 314'-7" 325'-4" 336'-1" 346'-10" 357'-7" 368'-4" 379'-1" 389'-10" 400'-7" 411'-4" 422'-1" 432'-10" 454'-4" 476'-10" 487'-7" 498'-4" 509'-1" 519'-10" 530'-7" 541'-4" 552'-1" 562'-10" 573'-7" 584'-4" 610'-1" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" Pr o p e r t y l i n e ( I n d i c a t i v e ) S e e P l a n Se t b a c k ( I n d i c a t i v e ) S e e P l a n Pr o p e r t y l i n e ( I n d i c a t i v e ) S e e P l a n Se t b a c k ( I n d i c a t i v e ) S e e P l a n Glass Facade. Color and Transparency to be determined prior to construction. Glass Balustrade. Color and Transparency to be determined prior to construction. Glass Facade. Color and Transparency to be determined prior to construction. Glass Balustrade. Color and Transparency to be determined prior to construction. daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.201.00 UNS 08/12/2015 PARALLEL TO COLLINS ELEVATION 75'-0" MIN TO 80'-0" MAX MEASUREMENT TAKEN TO SLAB EXTENSION 1.ALL ELEVATIONS ON NGVD 75'-0" MIN TO 80'-0" MAX MEASUREMENT TAKEN TO SLAB EXTENSION 67'-4"10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 65 ' - 6 " 166'-1"10 ' - 9 " 176'-10" Hotel 3 Floors M.E.P. 1 Floor 15 0 ' - 6 " 8 Units per floor Twist 14 Floors 76 ' - 3 " 599'-1" 6 Units per floor 7 Floors 14 ' - 0 " 627'-1" 28 ' - 0 " 58 1 ' - 8 " 2 Penthouses per floor 2 Floors 21 ' - 1 1 " MEP 1 Floor 649'-0" L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L21 L22 L23 L24 L25 L26 L27 L28 L29 L20 L31 L32 L33 L34 L35 L36 L37 L38 L39 L30 L41 L42 L43 L44 L45 L46 L47 L48 L49 L40 L51 L50 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " Max Building Height L5 L6 100'-7" Condotel 6 Floors 327'-4" 576'-7" 4 Suites per floor 2 Floors22 ' - 6 " 8 Units per floor 16 Floors 17 3 ' - 0 " 33 ' - 3 " L52 L53 L54 L55 L56 500'-4" 78'-1" 88'-10" 111'-4" 122'-1" 132'-10" 143'-7" 154'-4" 187'-7" 198'-4" 209'-1" 219'-10" 230'-7" 241'-4" 252'-1" 262'-10" 273'-7" 284'-4" 295'-1" 305'-10" 316'-7" 338'-1" 348'-10" 359'-7" 370'-4" 381'-1" 391'-10" 402'-7" 413'-4" 424'-1" 434'-10" 445'-7" 456'-4" 467'-1" 477'-10" 488'-7" 511'-1" 521'-10" 532'-7" 543'-4" 554'-1" 564'-10" 587'-4" 613'-1" Pr o p e r t y l i n e 47 ' - 0 " O f f s e t fr o m E C L L i n e Se t b a c k 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 21 5 ' - 0 " 3 Units per floor 15 Floors 3 Units per floor Twist 20 Floors 13 0 ' - 0 " 2 Unis per floor 12 Floors 24 ' - 1 1 " 28 ' - 0 " 58 1 ' - 8 " 1 Penthouse per floor 2 Floors MEP 1 Floor 649'-0" 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " 14 ' - 0 " Max Building Height L5 L6 16 1 ' - 3 " L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L53 L55 624'-1" 596'-1" 67'-4" 228'-7" 443'-7" L56 L54 L52 L36 L22 466'-1" 3 Units per floor 2 Floors22 ' - 6 " 78'-1" 88'-10" 99'-7" 110'-4" 121'-1" 131'-10" 142'-7" 153'-4" 164'-1" 174'-10" 185'-7" 196'-4" 207'-1" 217'-10" 239'-4" 250'-1" 260'-10" 271'-7" 282'-4" 293'-1" 303'-10" 314'-7" 325'-4" 336'-1" 346'-10" 357'-7" 368'-4" 379'-1" 389'-10" 400'-7" 411'-4" 422'-1" 432'-10" 454'-4" 476'-10" 487'-7" 498'-4" 509'-1" 519'-10" 530'-7" 541'-4" 552'-1" 562'-10" 573'-7" 584'-4" 610'-1" Pr o p e r t y l i n e -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" Glass Facade. Color and Transparency to be determined prior to construction. Glass Balustrade. Color and Transparency to be determined prior to construction. Glass Facade. Color and Transparency to be determined prior to construction. Glass Balustrade. Color and Transparency to be determined prior to construction. daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS NORTH ELEVATIONS TOWER 2 A-0.202.00 UNS 08/12/2015 TOWER 2 BEYOND 1.ALL ELEVATIONS ON NGVD Max Building Height TOWER 2 649' - NGVD Max Building Height TOWER 1 649' - NGVD 67'-4"10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 65 ' - 6 " 166'-1"10 ' - 9 " 176'-10" Hotel 3 Floors M.E.P. 1 Floor 15 0 ' - 6 " 8 Units per floor Twist 14 Floors 76 ' - 3 " 599'-1" 6 Units per floor 7 Floors 14 ' - 0 " 627'-1" 28 ' - 0 " 58 1 ' - 8 " 2 Penthouses per floor 2 Floors 21 ' - 1 1 " MEP 1 Floor 649'-0" L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L21 L22 L23 L24 L25 L26 L27 L28 L29 L20 L31 L32 L33 L34 L35 L36 L37 L38 L39 L30 L41 L42 L43 L44 L45 L46 L47 L48 L49 L40 L51 L50 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " Max Building Height L5 L6 100'-7" Condotel 6 Floors 327'-4" 576'-7" 4 Suites per floor 2 Floors22 ' - 6 " 8 Units per floor 16 Floors 17 3 ' - 0 " 33 ' - 3 " L52 L53 L54 L55 L56 500'-4" 613'-1" 587'-4" 564'-10" 554'-1" 543'-4" 532'-7" 521'-10" 511'-1" 488'-7" 477'-10" 467'-1" 456'-4" 445'-7" 434'-10" 424'-1" 413'-4" 402'-7" 391'-10" 381'-1" 370'-4" 359'-7" 348'-10" 338'-1" 316'-7" 305'-10" 295'-1" 284'-4" 273'-7" 262'-10" 252'-1" 241'-4" 230'-7" 219'-10" 209'-1" 198'-4" 187'-7" 154'-4" 143'-7" 132'-10" 122'-1" 111'-4" 88'-10" 78'-1"Pr o p e r t y l i n e Se t b a c k 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 21 5 ' - 0 " 3 Units per floor 15 Floors 3 Units per floor Twist 20 Floors 13 0 ' - 0 " 2 Unis per floor 12 Floors 24 ' - 1 1 " 28 ' - 0 " 58 1 ' - 8 " 1 Penthouse per floor 2 Floors MEP 1 Floor 649'-0" 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " 14 ' - 0 " Max Building Height L5 L6 16 1 ' - 3 " L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L53 L55 624'-1" 596'-1" 67'-4" 228'-7" 443'-7" L56 L54 L52 L36 L22 466'-1" 3 Units per floor 2 Floors22 ' - 6 " 78'-1" 88'-10" 99'-7" 110'-4" 121'-1" 131'-10" 142'-7" 153'-4" 164'-1" 174'-10" 185'-7" 196'-4" 207'-1" 217'-10" 239'-4" 250'-1" 260'-10" 271'-7" 282'-4" 293'-1" 303'-10" 314'-7" 325'-4" 336'-1" 346'-10" 357'-7" 368'-4" 379'-1" 389'-10" 400'-7" 411'-4" 422'-1" 432'-10" 454'-4" 476'-10" 487'-7" 498'-4" 509'-1" 519'-10" 530'-7" 541'-4" 552'-1" 562'-10" 573'-7" 584'-4" 610'-1" Pr o p e r t y l i n e Se t b a c k -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" ELEVATION -4'-0" LEVEL B1 ELEVATION +15'-8" LEVEL 01 ELEVATION +6'-0" COLLINS ELEVATION +26'-0" LEVEL 02 ELEVATION -8'-0" TOP OF PODIUM ELEVATION +42'-4" LEVEL 03 TOWER LEVEL 25'-0" PR O P E R T Y L I N E PR I M A R Y S T R U C T U R E S 3:2 M A X S L O P E L I N E UP T O 5 0 ' - 0 " H I G H (T O W E R S ) (P O D I U M ) MA X I M U M S E T B A C K PODIUM LEVEL PODIUM LEVEL 6'-0"ALLOWED 4 ' - 8 " 1 0 ' - 0 " 25'-0" MIN @ TOWER 25'-0" MIN @ PODIUM TOWER TOWER PODIUM LEVEL TOWER LEVEL ELEVATION +54'-4" LEVEL 04 FOR SLOPE LINE REFER TO SHEET A-0.010.00 PODIUM LEVEL PODIUM LEVEL TOWER TOWER PODIUM LEVEL ELEVATION -4'-0" LEVEL B1 ELEVATION +15'-8" LEVEL 01 ELEVATION +6'-0" COLLINS ELEVATION +26'-0" LEVEL 02 ELEVATION -8'-0" TOP OF PODIUM ELEVATION +42'-4" LEVEL 03 TOWER LEVEL TOWER LEVEL ELEVATION +54'-4" LEVEL 04 25'-0" 3: 2 M A X S L O P E L I N E UP T O 5 0 ' - 0 " H I G H 4 ' - 8 " 1 0 ' - 0 " 25'-0" MIN @ TOWER 25'-0" MIN @ PODIUM FOR SLOPE LINE REFER TO SHEET A-0.010.00 PR O P E R T Y L I N E PR I M A R Y S T R U C T U R E S (T O W E R S ) (P O D I U M ) MA X I M U M S E T B A C K Glass Facade. Color and Transparency to be determined prior to construction. Glass Balustrade. Color and Transparency to be determined prior to construction. Glass Facade. Color and Transparency to be determined prior to construction. A-0.203.00 EAST ELEVATIONS UNS 08/12/2015 1/32"= 1'-0" RY daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS 1.ALL ELEVATIONS ON NGVD Max Building Height TOWER 1 649' - NGVD 67'-4"10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 65 ' - 6 " 166'-1"10 ' - 9 " 176'-10" Hotel 3 Floors M.E.P. 1 Floor 15 0 ' - 6 " 8 Units per floor Twist 14 Floors 76 ' - 3 " 599'-1" 6 Units per floor 7 Floors 14 ' - 0 " 627'-1" 28 ' - 0 " 58 1 ' - 8 " 2 Penthouses per floor 2 Floors 21 ' - 1 1 " MEP 1 Floor 649'-0" L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L21 L22 L23 L24 L25 L26 L27 L28 L29 L20 L31 L32 L33 L34 L35 L36 L37 L38 L39 L30 L41 L42 L43 L44 L45 L46 L47 L48 L49 L40 L51 L50 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " Max Building Height L5 L6 100'-7" Condotel 6 Floors 327'-4" 576'-7" 4 Suites per floor 2 Floors22 ' - 6 " 8 Units per floor 16 Floors 17 3 ' - 0 " 33 ' - 3 " L52 L53 L54 L55 L56 500'-4" 78'-1" 88'-10" 111'-4" 122'-1" 132'-10" 143'-7" 154'-4" 187'-7" 198'-4" 209'-1" 219'-10" 230'-7" 241'-4" 252'-1" 262'-10" 273'-7" 284'-4" 295'-1" 305'-10" 316'-7" 338'-1" 348'-10" 359'-7" 370'-4" 381'-1" 391'-10" 402'-7" 413'-4" 424'-1" 434'-10" 445'-7" 456'-4" 467'-1" 477'-10" 488'-7" 511'-1" 521'-10" 532'-7" 543'-4" 554'-1" 564'-10" 587'-4" 613'-1" Pr o p e r t y l i n e Se t b a c k 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 21 5 ' - 0 " 3 Units per floor 15 Floors 3 Units per floor Twist 20 Floors 13 0 ' - 0 " 2 Unis per floor 12 Floors 24 ' - 1 1 " 28 ' - 0 " 58 1 ' - 8 " 1 Penthouse per floor 2 Floors MEP 1 Floor 649'-0" 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " 14 ' - 0 " Max Building Height L5 L6 16 1 ' - 3 " L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L53 L55 624'-1" 596'-1" 67'-4" 228'-7" 443'-7" L56 L54 L52 L36 L22 466'-1" 3 Units per floor 2 Floors22 ' - 6 " 78'-1" 88'-10" 99'-7" 110'-4" 121'-1" 131'-10" 142'-7" 153'-4" 164'-1" 174'-10" 185'-7" 196'-4" 207'-1" 217'-10" 239'-4" 250'-1" 260'-10" 271'-7" 282'-4" 293'-1" 303'-10" 314'-7" 325'-4" 336'-1" 346'-10" 357'-7" 368'-4" 379'-1" 389'-10" 400'-7" 411'-4" 422'-1" 432'-10" 454'-4" 476'-10" 487'-7" 498'-4" 509'-1" 519'-10" 530'-7" 541'-4" 552'-1" 562'-10" 573'-7" 584'-4" 610'-1" Pr o p e r t y l i n e -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 54'-4" 42'-4" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 54'-4" 42'-4" 47 ' - 0 " O f f s e t fr o m E C L L i n e Glass Facade. Color and Transparency to be determined prior to construction. Glass Balustrade. Color and Transparency to be determined prior to construction. Glass Facade. Color and Transparency to be determined prior to construction. Glass Balustrade. Color and Transparency to be determined prior to construction. daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.204.00 SOUTH ELEVATIONS TOWER 1 UNS 08/12/2015 1/32"= 1'-0" RY 1.ALL ELEVATIONS ON NGVD Dropoff L1 Parking Delivery BOHB1 Parking B1 Parking Tech T1 Lobby T2 Lobby Lounge Cafe 67'-4"10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 65 ' - 6 " 166'-1"10 ' - 9 " 176'-10" Hotel 3 Floors M.E.P. 1 Floor 15 0 ' - 6 " 8 Units per floor Twist 14 Floors 76 ' - 3 " 599'-1" 6 Units per floor 7 Floors 14 ' - 0 " 627'-1" 28 ' - 0 " 58 1 ' - 8 " 2 Penthouses per floor 2 Floors 21 ' - 1 1 " MEP 1 Floor 649'-0" L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L21 L22 L23 L24 L25 L26 L27 L28 L29 L20 L31 L32 L33 L34 L35 L36 L37 L38 L39 L30 L41 L42 L43 L44 L45 L46 L47 L48 L49 L40 L51 L50 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " Max Building Height L5 L6 100'-7" Condotel 6 Floors 327'-4" 576'-7" 4 Suites per floor 2 Floors22 ' - 6 " 8 Units per floor 16 Floors 17 3 ' - 0 " 33 ' - 3 " L52 L53 L54 L55 L56 500'-4" 613'-1" 587'-4" 564'-10" 554'-1" 543'-4" 532'-7" 521'-10" 511'-1" 488'-7" 477'-10" 467'-1" 456'-4" 445'-7" 434'-10" 424'-1" 413'-4" 402'-7" 391'-10" 381'-1" 370'-4" 359'-7" 348'-10" 338'-1" 316'-7" 305'-10" 295'-1" 284'-4" 273'-7" 262'-10" 252'-1" 241'-4" 230'-7" 219'-10" 209'-1" 198'-4" 187'-7" 154'-4" 143'-7" 132'-10" 122'-1" 111'-4" 88'-10" 78'-1"Pr o p e r t y l i n e Se t b a c k 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 21 5 ' - 0 " 3 Units per floor 15 Floors 3 Units per floor Twist 20 Floors 13 0 ' - 0 " 2 Unis per floor 12 Floors 24 ' - 1 1 " 28 ' - 0 " 58 1 ' - 8 " 1 Penthouse per floor 2 Floors MEP 1 Floor 649'-0" 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 10 ' - 9 " 11 ' - 9 " 14 ' - 0 " 14 ' - 0 " Max Building Height L5 L6 16 1 ' - 3 " L7 L8 L9 L10 L11 L12 L13 L14 L15 L16 L17 L18 L19 L20 L21 L23 L24 L25 L26 L27 L28 L29 L30 L31 L32 L33 L34 L35 L37 L38 L39 L40 L41 L42 L43 L44 L45 L46 L47 L48 L49 L50 L51 L53 L55 624'-1" 596'-1" 67'-4" 228'-7" 443'-7" L56 L54 L52 L36 L22 466'-1" 3 Units per floor 2 Floors22 ' - 6 " 78'-1" 88'-10" 99'-7" 110'-4" 121'-1" 131'-10" 142'-7" 153'-4" 164'-1" 174'-10" 185'-7" 196'-4" 207'-1" 217'-10" 239'-4" 250'-1" 260'-10" 271'-7" 282'-4" 293'-1" 303'-10" 314'-7" 325'-4" 336'-1" 346'-10" 357'-7" 368'-4" 379'-1" 389'-10" 400'-7" 411'-4" 422'-1" 432'-10" 454'-4" 476'-10" 487'-7" 498'-4" 509'-1" 519'-10" 530'-7" 541'-4" 552'-1" 562'-10" 573'-7" 584'-4" 610'-1" Pr o p e r t y l i n e Se t b a c k -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" -4'-0" 15 ' - 8 " 0'-0" 6' - 4 " 15'-8" 67'-4" 10 ' - 4 " 16 ' - 4 " 12 ' - 0 " 51 ' - 8 " Podium 4 Floors L1 / Parking 13 ' - 0 " 71 ' - 4 " B1 L1 L2 L3 L4 4' - 0 " NGVD B1 / Parking 26'-0"Drop off level 2'-4"13 ' - 4 " 12 ' - 0 " 14 ' - 8 " 42'-4" 54'-4" ELEVATION -4'-0" LEVEL B1 ELEVATION +15'-8" LEVEL 01 ELEVATION +6'-0" COLLINS ELEVATION +26'-0" LEVEL 02 ELEVATION -8'-0" TOP OF PODIUM ELEVATION +42'-4" LEVEL 03 TOWER LEVEL 25'-0" PR O P E R T Y L I N E 50'-0" MAX. PR I M A R Y S T R U C T U R E S 3:2 M A X S L O P E L I N E UP T O 5 0 ' - 0 " H I G H (T O W E R S ) (P O D I U M ) MA X I M U M S E T B A C K PODIUM LEVEL PODIUM LEVEL 6'-0"ALLOWED 4 ' - 8 " 1 0 ' - 0 " 25'-0" MIN @ TOWER 25'-0" MIN @ PODIUM TOWER TOWER PODIUM LEVEL TOWER LEVEL ELEVATION +54'-4" LEVEL 04 FOR SLOPE LINE REFER TO SHEET A-0.010.00 PODIUM LEVEL PODIUM LEVEL TOWER TOWER PODIUM LEVEL ELEVATION -4'-0" LEVEL B1 ELEVATION +15'-8" LEVEL 01 ELEVATION +6'-0" COLLINS ELEVATION +26'-0" LEVEL 02 ELEVATION -8'-0" TOP OF PODIUM ELEVATION +42'-4" LEVEL 03 TOWER LEVEL TOWER LEVEL ELEVATION +54'-4" LEVEL 04 25'-0" 50'-0" MAX. 3: 2 M A X S L O P E L I N E UP T O 5 0 ' - 0 " H I G H 4 ' - 8 " 1 0 ' - 0 " 25'-0" MIN @ TOWER 25'-0" MIN @ PODIUM FOR SLOPE LINE REFER TO SHEET A-0.010.00 PR O P E R T Y L I N E PR I M A R Y S T R U C T U R E S (T O W E R S ) (P O D I U M ) MA X I M U M S E T B A C K daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS A-0.301.00 SECTION 1 UNS 08/12/2015 1/32"= 1'-0" RY COOLING TOWERS SCREEN COOLING TOWERS SCREEN COOLING TOWERS SCREEN 1.ALL ELEVATIONS ON NGVD 03 A-0.310.01 01 A-0.310.01 02 A-0.310.01 LEVEL B1 LEVEL 01 LEVEL 02 ELEVATION -4'-0" ELEVATION +15'-8" ELEVATION +6'-0" ELEVATION +26'-0" ELEVATION -8'-0" TOP OF PODIUM COLLINS 13 ' - 8 " 7' - 8 " 13 ' - 8 " SLOPE 11% 14% MAX14% MAX CO L I N S A V E R I G H T OF W A Y MA X I M U M P A R K I N G ST R U C T U R E EN C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MAXIMUM HEIGHT FOR GARAGE STRUCTURE RE A R P R O P E R T Y LI N E 37'-8" BU L K H E A D LI N E LEVEL B1 LEVEL 01 LEVEL 02 ELEVATION -4'-0" ELEVATION +15'-8" ELEVATION +6'-0" ELEVATION +26'-0" ELEVATION -8'-0" TOP OF PODIUM COLLINS 7' - 8 " 18 ' - 2 " 2' - 8 " MAX 8% MAX 16% CO L I N S A V E R I G H T OF W A Y MA X I M U M P A R K I N G ST R U C T U R E EN C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MAXIMUM HEIGHT FOR GARAGE STRUCTURE 15 ' - 0 " 1' - 8 " BU L K H E A D LI N E 8' - 1 0 " MAX 8% MAX 8% 9' - 6 " OUTDOOR STEPPING AREA FOR SITTING SEE SHEET, A-0.102.00 PARKING POOL AREAS PARKINGPARKING AMENITIES LEVEL B1 LEVEL 01 LEVEL 02 ELEVATION -4'-0" ELEVATION +15'-8" ELEVATION +6'-0" ELEVATION +26'-0" ELEVATION -8'-0" TOP OF PODIUM COLLINS 1 0 ' - 3 " 7 ' - 8 " 16% MAX 7 ' - 6 " 16% MAX 10'-0" CO L I N S A V E R I G H T OF W A Y 75'-0" 50'-0" MA X I M U M P A R K I N G ST R U C T U R E EN C R O A C H M E N T PO R T E - C O C H E R E PE R M I T T E D S E T B A C K FR O N T S E T B A C K MAXIMUM HEIGHT FOR GARAGE STRUCTURE SLOPE 5% BU L K H E A D LI N E SLOPE 5% NORTH NEIGHBOR BUILDING OUTLINE A-0.310.01 ODP 1/16"= 1'-0" CL PODIUM SECTIONS 10/14/2015 BEACH ACCESS 3A-0.310.00 1/16" To 1'-0" daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Edward Andrew O'Donnell FL. Architect Reg. No: AR93533 CHATEAU GROUP Date Originator Scale Drawn by Number Title client FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN landscape architect 333 HUDSON STREET, SUITE 905 NEW YORK, NY 10013 USA. civil engineer structural engineer mechanical & electrical engineer VSN ENGINEERING DESIMONE JGP ENGINEERING GROUP 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check VARADERO 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 UNSTUDIO/TRACHTENBERG GENERAL NOTES architect of record ODP ARCHITECTS 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client 2801 FLORIDA AV. SUITE 18 MIAMI, FL 33133 T +1 (305) 461 9852 SLS FIRE PROTECTION ENGINEERS RAMP ACCESS TO LEVEL B1 2A-0.310.00 1/16" To 1'-0" SERVICE DRIVE 1A-0.310.00 1/16" To 1'-0" 1 0 ' - 0 " 9 ' - 0 " 18'-0" 2 ' - 0 " 4 " 4 " S T R I P P I N G L I N E ( W H I T E ) 1 7 ' - 0 " 4 " S T R I P P I N G L I N E ( B L U E ) 4 " 2 ' - 0 " 4 " 3 ' S Y M B O L 2 " 4 " S T R I P P I N G L I N E ( W H I T E ) 9 0 ° S T A N D A R D P A R K I N G OBSTRUCTION 9 0 ° S T A N D A R D P A R K I N G W / O B S T R U C T I O N 9 0 ° S T A N D A R D P A R K I N G ( H A N D I C A P P E D ) 5 ' - 8 " 18'-0" 10'-9" 6'-10" 1 7 ' - 9 " 1 7 ' - 1 " 7'-7" 9 ' - 0 " 18'-0" 2 ' - 0 " 4 " 4 " S T R I P P I N G L I N E ( W H I T E ) 2 ' - 0 " 4 " T A N D E M P A R K I N G 18'-0" d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 E d w a r d A n d r e w O ' D o n n e l l F L . A r c h i t e c t R e g . N o : A R 9 3 5 3 3 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t 3 3 3 H U D S O N S T R E E T , S U I T E 9 0 5 N E W Y O R K , N Y 1 0 0 1 3 U S A . c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J G P E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 1 ( 2 1 2 ) 2 8 5 0 0 8 8 c l i e n t 2 8 0 1 F L O R I D A A V . S U I T E 1 8 M I A M I , F L 3 3 1 3 3 T + 1 ( 3 0 5 ) 4 6 1 9 8 5 2 S L S F I R E P R O T E C T I O N E N G I N E E R S A - 0 . 4 5 0 . 0 0 0 8 / 1 2 / 2 0 1 5 V A R I E S C L S T A N D A R D P A R K I N G D E T A I L S O D P D E T A I L 0 1 S T A N D A R D P A R K I N G S T A L L S D E T A I L 0 2 M E C H A N I C A L P A R K I N G S Y S T E M S D E T A I L 0 3 T A N D E M P A R K I N G S T A L L S November 4, 2015 VARADERO SUNNY ISLES, FLORIDA INITIAL COMMENTS FOR THE VARADERO SITE PLAN APPLICATION Appl. No. PZ2015-16 Address: 18801 Collins Avenue To whom it may Concern, The following is in response to comments issued by The City of Sunny Isles Beach in the letter of 10/20/15 and the subsequent external DRC meeting of 10/29/2015. The response are to be read in conjunction with revised drawings being submitted here with. Comments: 1. The letter of the intent (LOI) does not specify: the number of dwelling units requested in your TDRs application. (120 dwelling units); the number of stories; and total square footage. Please clarify. RESPONSE: Letter of intent has been updated as requested. 2. Request number 3. has an incorrect Code citation. It is 265-35 D.(9)(c). RESPONSE: Letter of intent has been updated as requested. 3. Request for an extension of time 48 months in which to pull a building permit after the expiration of the 24 month period should be noted as request 5. RESPONSE: Letter of intent has been updated as requested. 4. Request to decrease building separation from 100’ to 75’ is required and should be noted as request. Provide letter from architect to support decreasing tower separation. RESPONSE: The distances between the South (Tower 1) and North (Tower 2) is measured perpendicular to Collins Avenue varying in separation from 75’- 0" to 78’ - 0". The "inward facing" overlap (Southern facade of Tower 2/Northern Facade of Tower 1) is minimized by shifting Tower 2 eastward approximately 73’ - 0". This, in turn, reduces the overlap of towers to a minimum of 60’-0". Architectural elements such as reflective glass coating or ceramic fritting will be used to further reduce the visibility into the residential units. This eastern shift of Tower 2 also increases for more unobstructed views from Collins Ave looking towards the east. 5. Request to reduce parking requirements under the City’s Code. This request shall be treated as a parking variance, based on parking calculations provided on the plans. RESPONSE: The parking calculations provided in the plans are in support of the shared parking requirements. Please note that the share parking study has been updated to reflect share parking for the hotel and the hotel amenities only. 6. Please provide legal description of description of property in a word document format. RESPONSE: Legal description has been provided. 7. Is appraisal amount to be used ($125.00/square foot) still valid? RESPONSE: appraisal was done specifically for this project and it is valid. 8. Which La Playa Beach Associates address is correct? 1300 Brickell Avenue of 100 East Hallandale Beach Blvd. Revise as necessary. RESPONSE: La Playa Beach Association has been revised. 9. Shared parking analysis letter states that the total number of residential units plus condo/hotel units is 521, whereas the TDR application references 522. Please advise the appropriate document. RESPONSE: The share parking agreement will reflect the correct number total of condotel and condo units. 10. Have the condominium association documents and Declaration of Use (PG 16646- 3651) be terminated? RESPONSE: Condominium Association Termination in progress. 11. Termination of the existing Beach Access is required before public hearing. Please add this as request 7. If approved, will the existing beach access be closed or open to the public? RESPONSE: Per the Current Architectural proposal the beach access will be moved from the south side of the site to the north. 12. The survey that was submitted is out of date. The buildings have been demolished. RESPONSE: Update to survey in progress. Existing Beach access will be terminated. 13. Any signage is required to be shown on site plan. RESPONSE: The Monumental Signage is currently been shown on page A-0.102.00. per SEC. 265-56A. 14. Any art work is required to be shown on site plan. RESPONSE: Allowance for Artwork have been made. The selection of the Artwork typically happens towers the end of the construction phase. 15. Please provide any information on pre-approvals from external agencies. RESPONSE: Record of pre-approval for DEP, Fire Department and FDOT has been forward. 16. Provide a construction schedule and construction value estimate. RESPONSE: Construction cost is currently estimated to $450,000,000 with a construction schedule of 34 months. 17. If this is a phased project, describe in LOI pursuant to Code requirements. RESPONSE: Letter of intent has been updated as requested. 18. Add in traffic/mobility studies an analysis of pedestrian connectivity by creating a crosswalk on the south side of 189 Street connecting the west side of Collins Avenue with the proposed beach access. RESPONSE: Traffic and mobility Study to be updated as requested. 19. Pursuant to Section 265-5, specify the apartment-hotel units that are subject to the five percent (5%) restriction. RESPONSE: Name of Units to be resolved prior to issuance of a building permit. PLANS 1. Cover Page: Aerial is several years out of date. Please update. RESPONSE: Out of date aerial will be replace with a more representative cover of the design aesthetic. 2. Sheet A-0.010.00 a. Provide floor height at all levels. RESPONSE: All elevations have been updated to reflect floor heights. b. Show north and south property side setbacks at four points each along north and south property lines. RESPONSE: north and south property lines have been updated on all elevations. c. Provide cross section of pedestal side setback at four points each north and south property lines RESPONSE: Pedestral sections have been added to on Sheet A-0.310.01. d. Provide distance separation between buildings. RESPONSE: Distance separation is reflected on Sheet A-0.010.03. The distance is 75'. Please reference comment 4 above. e. Building separation required is 100’, not 75’. Provide letter to support decreasing tower separation. RESPONSE: Please reference response to comment 4 above. f. Proposed building separation is shown as 80’ but Sheet A-0.201.00 the minimum separation is 75’. Please provide dimensions which must be measured from the closest points of the structures (i.e. balcony, structural element, design element) RESPONSE: Building separation is taken to the exterior most point on the building, the architectural feature. The Architectural feature is outside of the 75’ minimum requirement. Please reference comment 4 above. g. Front setback below grade provided is incorrect and is greater than 10”. RESPONSE: The Data Sheet is currently intended to reflect that the city’s minimum are met. The layout reflects that the physical separations is at a minimum 17’-5”. h. Rear setback must be measured from either bulkhead or property line and not erosion control line. Please correct. RESPONSE: The drawing has been updated. The rear setback is measured to the bulkhead line as this is closer to Collins as prescribe in the sunny isles code. i. Below grade garage north and south side setbacks not provided in table. RESPONSE: Below grade to the north and south side setback is to the property line. Table has been updated. j. North and south interior side setbacks must show actual number of feet for pedestal. RESPONSE: We will show maximum elevation as well as setback from property line. This should help to clarify that the top edge of the podium is within the prescribe code setback. k. Separate number of permitted units from TDR units. RESPONSE: Data Sheet has been updated accordingly. l. In Maximum Density Calculations Table density cannot be rounded up, please recalculate number of units and also remove the total allowance from table, the density listed as allowed cannot be obtained because this is a mixed-use project. Acreage cannot be rounded up. RESPONSE: Density has rounding has been corrected. Total allowance has been corrected. Acreage has been corrected. m. Provide total number of units under Amount of Off-Street Parking Table. RESPONSE: Total number of units has been updated and is reflected on the current Off-Street Parking Table. n. Clarify whether condotel units are in both towers and, if so, provide a breakdown. RESPONSE: Chart for condotel units has been updated to clearly reflect where the condotel units are located. o. Provide amount of off-street parking spaces as per Sec. 265-46 B. table to include requirement per each use. RESPONSE: Chart for Off-Street parking has been updated to reflect requirement per each use. p. Under Hotel venue and meeting space required parking is 46 not 45 spaces and Office parking required is 8 spaces. RESPONSE: Noted the number has been “rounded” accordingly. q. Based on ADA requirements a minimum of 2% of required parking must be ADA Accessible. Therefore, 22 H/C parking spaces are required whereas, 20 are proposed. RESPONSE: Per the addition of the spaces per comment P. 23 H/C spaces are required and will be reflected in the layout both on level 1 for the self-parking floor. r. Add 5. to indicate number of hotel rooms. RESPONSE: a Fifth chart has been added to reflect the number of hotel rooms. s. Zoning requirements and project data to be on one page for better readability, move tower matrix to next sheet. RESPONSE: Tower Matrix has been moved. 3. Sheet A-0.050.00 a. Provide setbacks from rear property line of bulkhead, not ECL. RESPONSE: Setback has been provided. b. Correct required tower separation of 100’. RESPONSE: Please reference response to comment 4 above. c. Show actual structure setbacks from all property lines. RESPONSE: Actual Structural Setback has been added to drawing. d. What is the use of the south side of property? Palms should be located along the complete south area. RESPONSE: Please note that this is a service drive to tower one MEP. ie FPL Vault, Switch Gear ect. Palms may be an issue. e. Provide driveway setbacks from both north and south property lines. RESPONSE: Driveway setback have been added to the drawings. f. Show driveway locations on adjacent properties with distance separation pursuant to Sec. 265-47 D. RESPONSE: Driveway separation has been added to drawing. We’ve also noted that driveway are existing. 4. Sheet A-0.100.00 a. Please verify Level B1 parking count. RESPONSE: The Parking count shown is reflective of the shared parking requirements. The layout as shown on B1 is intended to guarantee the number as required by the shared parking count. 5. Sheet A-0.104.00 a. Provide floor elevations. RESPONSE: Elevations have been added to plan. 6. Sheet A-0.108.00/A-0.115.00 a. Level 14 Plan not provided. RESPONSE: Level 14 MEP plan has been added to the Site Plan Submission 7. Sheet A-0.115.00/A-0.145.00 a. Level 45 is shown on both sheets. RESPONSE: The layout has been corrected. Please reference plan sheet A- 0.145.00 8. Sheet A-0.201.00 to -0.201.00 a. Access is misspelled. RESPONSE: Corrected. b. Provide color renderings. RESPONSE: Color of the provided elevations are in progress. c. Building separation distance is 75’ not 80’ as stated on Sheet A-0.0101.00. RESPONSE: Please reference Sheet A-0.010.03 for Building separation. Building separation to be maintained at 75’. Please reference comment 4 above. d. Provide property lines extension. RESPONSE: Property line extension has been provided. e. Provide setback dimension and also add setback diagram included on sheet A- 0.010.00 RESPONSE: Setback Dimension and Information from Setback diagram has been integrated into elevation. 9. Sheet A-0.301.00 a. Notate direction of cross section elevation. RESPONSE: Direction of cross section has been added to elevations. 10. Sheet L-2.000.00 a. Show property lines. RESPONSE: See Landscape response. Landscape response to be formalized and integrated into this response. 11. Sheet L-6.000.00 a. Verify that entire width of beach access easement is 20’. RESPONSE: See Landscape response. Landscape response to be formalized and integrated into this response. b. This Sheet is repeated in package. RESPONSE: See Landscape response. Landscape response to be formalized and integrated into this response. c. Beach access needs to provide amenities as benches, garbage containers, pavers, lighting, signage, showers, bicycle rack, etc. Also, design need to match City Streetscape master plan. RESPONSE: See Landscape response. Landscape response to be formalized and integrated into this response. 12. Site Logistics Plan RESPONSE: Site Logistics Plan in progress. 13. Add sheet depicting all easements required for proposed project - also, add all easements at the site plan, landscaping, and civil sheets. RESPONSE: all easement requirement are on sheet A-050.00 TRAFFIC REVIEW 1. Traffic analysis must be based on 349 apart/hotel units as this is the number the City has been able to verify and not 210 Condo and 210 Hotel units. Miami-Dade Property Appraisal only recognized 340 units and the Department of Business and Professional Regulation does not show a hotel license for this location. Traffic Report should be amended to reflect a maximum unit count of 349 units. If applicant has additional information please provide to the City. Additional traffic comments are forthcoming after Applicant address this issue. RESPONSE: Confirmation in progress. CIVIL ENGINEERING REVIEW 1. Drawing No. A-0.100.00 - Please provide the drive aisle widths for all drive aisles. Also provide the drive aisle width at the pinch points on the easternmost north-south drive aisle. RESPONSE: A-0.100.00 has been updated with the drive aisle widths for all drive aisles. 2. Drawing No. A-0.100.00 - Please provide AutoTurn analysis for a garbage truck accessing Basement Level B1. RESPONSE: Drawing has been updated with Auto Turn analysis for a garbage truck. 3. Drawing No. A-0.100.00 - What is the design vehicle depicted on this sheet? Were the turning movements generated using AutoTurn? RESPONSE: The Updated Vehicle is a Heil DuraPack 5000 Refuse Collection Truck. 4. Drawing No. A-0.100.00 - Consideration should be given to eliminating some of the parking spaces adjacent to walls as there will be difficulty in parking and backing out vehicles from these spaces. RESPONSE: Sufficient back up space will be provided to minimized difficulty. Layout to be revised. 5. Drawing No. A-0.100.00 - How is the basement graded to allow triple mechanical spaces on the west side of the basement level? The ramp from Level 01 appears to drop approximately 17.5’ - 18’ which does not appear to be adequate to allow for three vehicles to be stacked. RESPONSE: The clear height for a Klaus Parking System is 18’-6”. Ramp and clear height will accommodate clear height requirements for triple stack vehicles. 6. General Comment - How are levels B1, 01 and 02 being drained? There are no drainage details in the submitted set. Please provide. RESPONSE: Drainage for levels b1, 01 and 02 will be addressed in the building permit drawings. 7. General Comment - Please provide ADA access from street level to Levels 01 and 02. RESPONSE: ADA access has been incorporated to both towers with ADA elevators. Please see drawings A-0.102.00 8. Drawing A-0.102.00 - Please show the driveway configuration for two main driveways. If the intent is to use the existing driveways please label the plans as such. The plans currently show existing curb in front of the proposed driveways. RESPONSE: Sheet A-0.050.00 has been labelled with the existing driveways and curbs. Please review. 9. General Comment - It appears that runoff from the ramps leading to the two buildings will enter into FDOT’s drainage system on Collins Avenue. Has this been approved by FDOT? Typically the site is required to retain all of its runoff onsite. RESPONSE: Civil Drawings clearly show that the runoff will be kept on site. The project will use trench drain at multiple locations to achieve this. See sheet A-0.102.00 10. Undergrounding of utilities is required. Coordination must be done with City Staff and City COnsultants. Also, sidewalk is required to be upgraded to pavers. Please show detail. RESPONSE: We will meet the city’s standard condition on underground utilities and the pavers requirements. Paver detail to be updated. LANDSCAPING WRITEN RESPONSE TO COMMENTS 1. Sheet L-0.000.00: The landscape Legend is incorrect. Minimum code requirements must be met and legend corrected. RESPONSE: Noted. Legend will be corrected accordingly and code requirements will be met. 2. Sheet L-2.000.00: Sidewalk along Collins Avenue must meet City Standard. Provide Details RESPONSE: Noted. Civil sub-consultant team will provide specifications and City Standard. 3. Sheet L-2.000.00: Specify Type, Color, Size etc of proposed paving. RESPONSE: Noted. Specifications will be provided. 4. Sheet L-3.000.00: The Landscape plan is very preliminary. Provide plant identification on plan with quantities per area and call outs for all plant symbols. Plan is very difficult to read and review. RESPONSE: Noted. Callouts will be provided. 5. Sheet L-3.000.00: (3286) Ilex vomitoria in front of Collins Avenue with no tree or Palm Canopy above is very stark and also creates a monoculture. Consider what it will look like from the motorist or pedestrian. Not just from towers above. Redesign front along Collins to complement and enhance the subtropical character of the beachside community of sunny isles beach. RESPONSE: Noted. Due to an underground parking garage, root space is extremely limited. Every effort will be made to attempt to add verticality to the street frontage but due to the available soil the trees will be limited to along the Collins Avenue sidewalk and near the front of the building. This frontage is not a pedestrian area. The lines of shrubs are reflecting lines and angles in the architecture. This theme is further carried through with the paving plans. Additional plantings have been added to the design to add more diversity. 6. Sheet L-3.000.00: row of ilex vomitoria with lawn in between (this is an assumption since is not define) is very high maintenance. Narrow strips of sod are not encouraged because they are high maintenance. Furthermore, mature Ilex vomitoria tends to get leggy when constantly sheared. RESPONSE: Noted. The Ilex has been changed to Ficus Green Island. We fully understand the maintenance requirements for a landscape of this design. The City has a culture of high design and the required maintenance and the Owner is fully committed to maintaining the landscape. 7. Sheet L-3.000.00: It is very difficult to differentiate tree symbols, but Gumbo Limbo, Tabebuia or Royal Poinciana are on the Beach (front line exposure) they will have a very difficult time thriving. All plants material must have a high wind tolerance and suitable for this beachfront location. Highly tolerant of wind and salt spray. RESPONSE: Noted. The planting plan will have the necessary call-outs. The Tabebuias will be removed and reaplces with a more wind tolerant species. The Ownership is enamored with the Royal Poinciana. This species will remain in the design but the quantity will be reduced and they will be placed in areas where the winds can be buffered. 8. Sheet L-3.000.00: The opening between buildings is a wind tunnel and Royal Ponciana and Licuala Palms will suffer wind damage. RESPONSE: Noted. The planting design will take this into account. 9. Sheet L-3.000.00: Include City required amenities along beach access such as benches, signage, trash receptacles, lighting, shower, bike racks etc. RESPONSE: Noted. These amenities will be designed for. 10. Sheet L-3.000.00: Medjool Date Palms at 15ft on center are too close and not in keeping city streetscape. Medjool Date Palms should be a min of 25ft on center. RESPONSE: Noted. The palms will be spaced further apart. 11. Sheet L-3.000.00: Provided sight lines at driveways intersecting Collins avenue per FDOT criteria and ensure there are no conflicts. RESPONSE: Noted. The Fdot 546 sight visibility triangles will be provided in the plans. 12. Sheet L-3.000.00: Clearly delineate on plan which trees count toward street tree requirement. RESPONSE: Noted. The landscape legend will be updated and noted correctly in the plans. 13. Sheet L-3.000.00: Show existing and proposed utilities on landscape Plan and ensure there are no conflicts. RESPONSE: Noted. Will be provided. 14. Sheet L-3.000.00: The location of backflow preventers, siamese pipes, exterior transformers and/or other related devices and fixtures shall be clearly indicated on the landscape plan and shown how they are screened with landscape material. From the right of way. RESPONSE: Noted. Will be provided. 15. Sheet L-3.000.00: Label and ensure that clear zones adjacent to all fire hydrants, siamese connections and any other fire equipment the utilize fire hoses meets the South Florida Fire Prevention Code. RESPONSE: Noted. Will be provided. 16. Sheet L-3.100.00: Verify that all plant material is commercially available and thrives in South Florida. RESPONSE: Noted. 17. Sheet L-3.100.00: Be specific on the height of trees and palms in lieu of a range such as 20’ – 40’ height. RESPONSE: Noted. 18. Sheet L-3.100.00: Indicate amount of clear trunk on Seagrape, Gumbo limbo, Tabebuia and Silver Bottonwood and grey wood for Coconut palms. RESPONSE: Noted. 19. Sheet L-3.100.00: Sorhastrum notans (Indian grass) is not a South Florida native grass and is not acceptable on dune. All plant material on the dune must be native to South Florida. RESPONSE: Noted. The Indian Grass is to be replaced with Sea Oats. 20. Sheet L-3.100.00: St. Augustine is specified as Sorghastrum nutants. Please correct. RESPONSE: Noted. 21. Sheet L-4.000.00: Provided cut sheets with specifications for proposed lighting. RESPONSE: Noted, Will be provided. 22. Sheet L-5.000.00: Detail 4 depicts street tree planting in sidewalk. There are no trees planted in sidewalk. RESPONSE: Agree. This detail will be removed. 23. Sheet L-5.000.00: Detail 7 notes 4” ortona Sand/Fiber soil mixture, 8” San topsoil and 24” planting soil. This is not typical for a project in South Florida. RESPONSE: Noted. Organic matter will be added to the soil mixture. 24. Sheet TD-1: The existing Tree Disposition Plan indicates existing Coconut Palms on the Landscape plan. The existing Tree Disposition Plan shall be prepared by the Landscape Architect of Record. RESPONSE: Noted: Will be provided. 25. Include typical Section through front, rear and sides of project to communicate design intent. Include section through dune. RESPONSE: Noted, Will be provided. 26. All plant material shall be Florida No.1 per state of Florida Grades and Standards for nursery Plants, Part I & II, Prepared by the state of Florida Dep. of Agriculture & Consumer Services, current edition. Include note on plans. RESPONSE: Noted. 27. Further review will be required upon receipt of information required above. RESPONSE: Noted. 28. Landscape Plans must be signed and sealed by State of Florida Registered Landscape Architected. RESPONSE: Noted. 29. Provide written response to comments. RESPONSE: Noted. END OF RESPONSE Edward O’Donnell Vice President O’Donnell Dannwolf & Partners Architects INC. 2432 Hollywood Boulevard Hollywood Florida 33020 AA 26000996 November 4, 2015 VARADERO SUNNY ISLES, FLORIDA INITIAL COMMENTS FOR THE VARADERO SITE PLAN APPLICATION Appl. No. PZ2015-16 Address: 18801 Collins Avenue To whom it may Concern, I, Edward O’Donnell, registered architect for the state of Florida, request to consider the following decrease for building separation from 100’ to 75’ for the proposed project Varadero, located on 18801 Collins Avenue in the City of Sunny Isles Beach. The distances between the South (Tower 1) and North (Tower 2) is measured perpendicular to Collins Avenue varying in separation from 75’- 0" to 78’ - 0". The "inward facing" overlap (Southern facade of Tower 2/Northern Facade of Tower 1) is minimized by shifting Tower 2 eastward, reducing the “overlap” to 60’-0" of each facade. Architectural elements such as reflective glass coating or ceramic fritting will be used to further reduce the visibility into the residential units. This eastern shift of Tower 2 also creates a greater area of unobstructed views from Collins Ave looking towards the east. Should you have any questions please feel free to contact me. Edward O’Donnell Vice President O’Donnell Dannwolf & Partners Architects INC. 2432 Hollywood Boulevard Hollywood Florida 33020 AA 26000996 KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. www.callsunshine.com GRAPHIC SCALE 0 15 30 60 ( IN FEET ) 1 inch = 30 ft. = CATCH BASIN ®= MANHOLE moo= LIGHT POLE 1. D. = WATER METER X = WATER VALVE = CATCH BASIN INLET ❑ = UTILITY POLE ® = RISER = FIRE HYDRANT ® = HANDHOLE �— = SIGN '—FOUND 1/2" PIPE & CAP LB3653 (10/28/15) OUND 1/2" PIPE & CAP B3653 (10/28/15) EROSION CONTROL LINE DF THE ATLANTIC OCEAN 'LAT BOOK 134 PAGE 47 ?" PIPE & CAP )/28/15) LEGEND P.R.M. = PERMANENT REFERENCE MONUMENT 0 = CONCRETE = ASPHALT PAVEMENT Q / 27 I I I I I I I 14 O I I I I I I I I I I I I I Q 191 STREET =211 �I�ITT�4 5 190th. STREET 189th. TERRR. 0 30I-TI-ILTUT z 189th. STREET O� 1L 1 I LT I L1 I LT16m 30. . . I . . . . I �T� 117 / O'p 1 1241 13 i 187th. STREET _OCATION SKETCH NOT TO SCALE LEGAL DESCRIPTION: TRACT "D" I i Q TRACT "E" 0 a 0 a' W TRACT "H" Q 12 SITE W Z 13 j / Q / e 1 118 IL >L � --,I—IL 10 5 / ,9y 1 15 186th. STREET v 1 4 L �- o �0 113 / �6 1 I TRACT "I" TRACT "L" All of Tract "I", less the South 216.66 feet as measured at right angles to the South line of said Tract "I", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami—Dade County, Florida. TOGETHER WITH That parcel of land lying East of and bounded on the West by the East line of said Tract "I", and bounded on the North by the Easterly extension of the North line of said Tract "I", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami—Dade County, Florida, and bounded on the South by the Easterly extension of the North line of the South 216.66 feet, Zas measured at right angles to the South line of said Tract "I" of AMENDED PLAT NORTH BISCAYNE BEACH AND W The South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plot Book 44, at Page 42, of the Public Records of Miami—Dade County, Florida. UTOGETHER WITH OThat parcel of land lying East of and bounded on the West by the East line of said Tract "H", and bounded on the North by the Easterly extension of the North line of said South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami—Dade County, Florida, and bounded on the South by the Easterly extension of the South line of said Tract "H" of AMENDED PLAT NORTH UBISCAYNE BEACH. SURVEYOR'S NOTES: Z — This site lies in Section 2, Township 52 South, Range 42 East, City of Sunny Isles Beach, Miami—Dade County, Florida. — All documents are recorded in the Public Records of Miami—Dade County, Florida unless otherwise noted. J— Lands shown hereon were abstracted for restrictions, easements and/or rights—of—way of records per First American Title Insurance Company FAST File No. 1062-2986192 with an effective date of September 30, 2014. All easements and/or rights of way of record per title commitment that are plottable are shown on this "Boundary Survey". SCHEDULE B — SECTION 11 = 0.5' CURB 1-2 = 2.00' CURB & GUTTER —x—= CHAIN LINK FENCE 1. D. = IDENTIFICATION EL. = ELEVATION INV. = INVERT SAN. = SANITARY P.R.M. = PERMANENT REFERENCE MONUMENT 0 = CONCRETE = ASPHALT PAVEMENT Q / 27 I I I I I I I 14 O I I I I I I I I I I I I I Q 191 STREET =211 �I�ITT�4 5 190th. STREET 189th. TERRR. 0 30I-TI-ILTUT z 189th. STREET O� 1L 1 I LT I L1 I LT16m 30. . . I . . . . I �T� 117 / O'p 1 1241 13 i 187th. STREET _OCATION SKETCH NOT TO SCALE LEGAL DESCRIPTION: TRACT "D" I i Q TRACT "E" 0 a 0 a' W TRACT "H" Q 12 SITE W Z 13 j / Q / e 1 118 IL >L � --,I—IL 10 5 / ,9y 1 15 186th. STREET v 1 4 L �- o �0 113 / �6 1 I TRACT "I" TRACT "L" All of Tract "I", less the South 216.66 feet as measured at right angles to the South line of said Tract "I", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami—Dade County, Florida. TOGETHER WITH That parcel of land lying East of and bounded on the West by the East line of said Tract "I", and bounded on the North by the Easterly extension of the North line of said Tract "I", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami—Dade County, Florida, and bounded on the South by the Easterly extension of the North line of the South 216.66 feet, Zas measured at right angles to the South line of said Tract "I" of AMENDED PLAT NORTH BISCAYNE BEACH AND W The South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plot Book 44, at Page 42, of the Public Records of Miami—Dade County, Florida. UTOGETHER WITH OThat parcel of land lying East of and bounded on the West by the East line of said Tract "H", and bounded on the North by the Easterly extension of the North line of said South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", and bounded on the East by the Erosion Control Line of the Atlantic Ocean, as recorded in Plat Book 134 at Page 47, of said Public Records of Miami—Dade County, Florida, and bounded on the South by the Easterly extension of the South line of said Tract "H" of AMENDED PLAT NORTH UBISCAYNE BEACH. SURVEYOR'S NOTES: Z — This site lies in Section 2, Township 52 South, Range 42 East, City of Sunny Isles Beach, Miami—Dade County, Florida. — All documents are recorded in the Public Records of Miami—Dade County, Florida unless otherwise noted. J— Lands shown hereon were abstracted for restrictions, easements and/or rights—of—way of records per First American Title Insurance Company FAST File No. 1062-2986192 with an effective date of September 30, 2014. All easements and/or rights of way of record per title commitment that are plottable are shown on this "Boundary Survey". SCHEDULE B — SECTION 11 of way 1-2 Standard Exceptions Cn J 3 INTENTIONALLY DELETED — Elevations shown hereon are relative to the National Geodetic 4 Standard Exceptions on Miami—Dade 5 INTENTIONALLY DELETED of catch basin at 6 Standard Exceptions West of 7 INTENTIONALLY DELETED > 8 Standard Exceptions — Lands shown hereon are located within an area having a Zone 9 Restrictions, dedications, conditions, reservations, easements and other matters shown on the plat of AMENDED the Federal Emergency Management Agency (FEMA), on Flood PLAT NORTH BISCAYNE BEACH, as recorded in Plat Book 44, at Page 42. 12086C0153L, LU Q No easements per plat to plot. Affects parcel but not subject to location. index map revised September 1 1 10 Easement granted to Florida Power and Light Company, filed July 12, 1982, in Official Records Book 11494, at a Page 737. zm� J Not a part. 11 Declaration of Use, filed January 13, 1995, in Official Records Book 16646, at Page 3651. Affects parcel but not subject to location. C0 12 Intentionally deleted. T_ 13 Riparian Rights and/or Littoral Rights are not insured. I O p. Not a survey matter. o cf) NOTE: All recording references in this commitment/policy shall refer to the Public Records of Miami—Dade County, Florida, unless otherwise noted. C/� — Bearings hereon are referred to an assumed value of S03"01'34"W for the East right of way line of Collins Avenue, and evidenced by (2) found nail & disk. Cn J 0 > — Elevations shown hereon are relative to the National Geodetic Vertical Datum of 1929, based on Miami—Dade County Bench Mark No. A -5—R, Elevation +5.98 and located by PK nail and washer on deck of catch basin at N.E. 189th Street (215' South of centerline) and Highway A -1—A (Collins Avenue) (2' West of West edge of pavement & 40' North of a fire hydrant). > �. z — Lands shown hereon are located within an area having a Zone Designation X, AE (EL 8) & VE (EL 10) by the Federal Emergency Management Agency (FEMA), on Flood Insurance Rate Map No. 12086C0153L, LU Q for Community No. 120688, dated September 1 1 , 2009, and index map revised September 1 1 , 2009, and is relative to the National Geodetic Vertical Datum of 1929. 0 a — Pursuant to Florida State Statutes in Chapter 1 61 .141 , it designates that an upland property landward of the established Erosion Control Line shall remain the property of the upland owner. — Dimensions indicated hereon are field measured by electronic measurement, unless otherwise noted. — Lands shown hereon containing 205,424 square feet, or 4.716 acres, more or less. — All horizontal control measurements are within a precision of 1:10,000. — This map is intended to be displayed at the graphic scale shown hereon or smaller. — Roof overhang not located unless otherwise shown. — Underground improvements and/or underground encroachments not shown unless otherwise indicated. — The approximate location of all utilities shown hereon were determined from As—Built plans and/or on—site locations and should be verified before construction. — Legal description shown hereon furnished by client and no claims as to ownership are made or implied. CERTIFICATION TO: Banco Inbursa S.A. Institucion de Banca Multiple, Grupo Financiero Inbursa, Dune Real Estate Partners LP, Dune Real Estate Fund III LP, DREF III International Fund LP, DREF III Playa LLC, DREF III Playa II LLC, FD Sunny Isles Member LLC, La Playa MM, LLC, Lo Playa CF LLC, La Playa Beach Holdings, LLC, La Playa Beach Associates, LLC, Fortress Credit Co LLC, Fortress Credit Corp., Fortress Credit Advisors LLC, Fortress Real Estate Opportunities Advisors LLC, Drawbridge Special Opportunities Fund LP, any fund or account managed directly or indirectly by Fortress Investment Group LLC, and any of its and their respective assigns, affiliates, agents and advisors SURVEYOR'S CERTIFICATION: This is to certify that this "Boundary and Topographic Survey" was made under my responsible charge on September 22, 2014 and last updated on October 28, 2015, in accordance with the 2011 Minimum Standard Detail Requirements for ALTA/ACSM Land Title Surveys, jointly established and adopted by ALTA and NSPS, and meets the applicable codes as set forth in the Florida Administrative Code, pursuant to Section 472.027, Florida Statutes. "Not valid without the signature and the original raised seal of a Florida Licensed Surveyor and Mapper" FORTIN, LEAVY, SKILES, INC., LB3653 Bv: Daniel C. Fortin, For The Firm Surveyor and Mapper, LS2853 State of Florida. This Drawing is the Property of Fortin, LEAVY, SKILES, Inc. and is an Instrument of Service not to be Reproduced in Whole or in Part without the Express WRITTEN Permission of Same. i Date 9/22/14 Scale 1 "=30' Drawn By. MAP Cad. No. 140915 Plotted: 10/30/15 10:02a Ref. Dg. 2005-268 Field Book. Job. No. 140916 Dg. No, 2014-135-1 Sheet 1 of 1 Q Q a- Q Cn J 0 > M 0 V M LL Op cMrl >1 LLI o 'fid > �. z W • o W W w C/) Z LU Q w Z :2 w cn 0 a zm� J Q LTJ O Z T C0 U Q T_ Q � I O p. o cf) ~ Q Lu v w s (, C/� Cn Q t; ::) \Q Q _ u7 LL > Q 005 \ W D U) J m I Q (n O (� W m W 0 W Elf Z O0 z O � Q � U O N Q D LLJ Q O cr) w Q t cz L Lo G) O u7 N Z O w r7 N � O �—{ Z n M l l I� U U Date 9/22/14 Scale 1 "=30' Drawn By. MAP Cad. No. 140915 Plotted: 10/30/15 10:02a Ref. Dg. 2005-268 Field Book. Job. No. 140916 Dg. No, 2014-135-1 Sheet 1 of 1 Q W 0 > M 0 V w LL Op cMrl >1 LLI o 'fid > �. � W • o W W C/) Z LU Q ~ 0 a zm� C � Z T C0 U Q T_ W m � I O U) J Cl) w } (, C/� c) t; ::) \Q Q > LL > O z`° 1n Q W w o O t cz (J w w U 0C � �—{ n M l l I� U U Date 9/22/14 Scale 1 "=30' Drawn By. MAP Cad. No. 140915 Plotted: 10/30/15 10:02a Ref. Dg. 2005-268 Field Book. Job. No. 140916 Dg. No, 2014-135-1 Sheet 1 of 1 Q W 0 > 0 w LL Z LLI ~ > D QQ W C/) Z LU Q ~ 0 a U C � Z T C0 U Q T_ W m � I O U) J Cl) w } (, 0 Q Z ::) \Q Q > LL O Q U Date 9/22/14 Scale 1 "=30' Drawn By. MAP Cad. No. 140915 Plotted: 10/30/15 10:02a Ref. Dg. 2005-268 Field Book. Job. No. 140916 Dg. No, 2014-135-1 Sheet 1 of 1 CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-0.000.00 WEST8 11/04/2015 N/A W8 PLANTING TABULATIONS W8 - T 1 4 7 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : TABULATIONS / MINIMUM CODE REQUIREMENTS R TREE RELOCATION LEGEND TREE TO BE RELOCATED DUNE VEGETATION TO BE REMOVED EXISTING COCONUT PALM Quantity: 16uds FIRE HYDRANT PREVENTOR BACKFLOW FIRE HYDRANT (TYP.) FIRE CONNECTION FLORIDA POWER & LIGHT COMPANY MANHOLE BELLSOUTH TELEPHONE COMPANY MANHOLE METER LID TRAFFIC LIGHT POLE METER LID NORTH MIAMI BEACH SAMPLE RISER STATION #2 COMPANY TRANSFORMER FLORIDA POWER & LIGHT GUY WIRE WIRE (TYP.) OVERHEAD STORM MANHOLE CATCH BASIN INLET STORM MANHOLE STORM MANHOLE CA T C H B A S I N I N L E T SANITARY MANHOLE DE P R E S S E D C U R B DE P R E S S E D C U R B DE P R E S S E D C U R B DE P R E S S E D C U R B DE P R E S S E D C U R B GA T E GUARDRAIL HIGHWAY INFORMATION SIGN ALUMINUM RAIL 3' HIGH FENCE 0.5' CURB (TYP.) PAINT STRIPE (TYP.) CO N C R E T E S I D E W A L K CO N C R E T E S I D E W A L K ALUMINUM RAIL 6' HIGH FENCE WOOD RAMP WALK BRICK WALK 1.5' WIDE BULKHEAD DUMPSTER 0.6' WALL (TYP.) 0.75' WALL FENCE 6' HIGH RAIL 1.35' x 2' HIGH WALL STEEL RAIL 6' HIGH FENCE BRICK FENCE 6' HIGH RAIL BEACH SAND BEACH SAND BEACH SAND 0.67' WALL EROSION CONTROL LINE OF THE ATLANTIC OCEAN PLAT BOOK 134 PAGE 47 DA D E C O U N T Y B U L K H E A D L I N E PL A T B O O K 7 4 P A G E 1 BENCHMARK ELEVATION MIAMI-DADE COUNTY #A-5-R EA S T L I N E O F T R A C T H PL A T B O O K 4 4 P A G E 4 2 EA S T L I N E O F T R A C T I PL A T B O O K 4 4 P A G E 4 2 S86°53'43"W S0 3 ° 0 1 ' 3 4 " W 43 5 . 8 1 ' N0 3 ° 3 6 ' 2 2 " E 20 2 . 6 7 ' N0 1 ° 3 0 ' 0 5 " E 23 2 . 7 9 ' 474.16'N86°53'43"E 469.99' 244.35' 236.47'237.69' FOUND 1/2" PIPE & CAP LB3653 (3/24/15) FOUND 1/2" PIPE & CAP LB3653 (3/24/15) FOUND 1/2" PIPE & CAP LB3653 (3/24/15) 4' FO U N D N A I L & D I S K WI T N E S S C O R N E R 4. 0 2 ' O F F S E T L B 3 6 5 3 ( 3 / 2 4 / 1 5 ) TRUE CORNER INACCESSIBLE (3/24/15) FOUND NAIL & DISK WITNESS CORNER 5.00' OFFSET LB3653 (3/24/15) FOUND SPIKE & DISK LB3653 (3/24/15) FOUND NAIL & DISK LB3653 (3/24/15) FOUND NAIL & DISK 4' 5 . 0 0 6. 0 0 6 . 0 0 5. 0 0 4. 0 0 3. 0 0 2. 0 0 7. 0 0 7. 0 0 7. 0 0 7 . 0 0 0 FENCE 6' HIGH CHAINLINK 0 FENCE 6' HIGH WOOD 0 0 0 0 FENCE 6' HIGH WOOD A S P H A L T P A V E M E N T P A V E M E N T 4.3 ' BU I L D I N G SO U T H 4.0 ' BU I L D I N G SO U T H 13 . 1 ' 8.0 ' 19. 0 ' 4.0 ' WA L L NO R T H 4.1 ' BU L K H E A D NO R T H 5.7 ' WA L L NO R T H 4.0 ' FE N C E NO R T H 2.0 ' WA L L NO R T H 1.0 ' FE N C E NO R T H 600.00' RIGHT OF WAY PLAT BOOK 44 P A G E 4 2 3.0 0 5 . 0 0 5.0 0 7 . 0 0 7. 0 0 7.00 7.00 4.0 0 6.0 0 6.0 0 351.7' MARERAS 25'- 0" 50'- 0" 31'- 0" 25'- 0" DADE COUNTY BULKHEAD LINE PLAT BOOK 74 PAGE 1 Tower Setback50' Porte Cochere 46'-0" OFFSET FROM ECL LINE TO W E R S E T B A C K PO D I U M S E T B A C K LI M I T O F W O R K CO S T A L C O N S T R U C T I O N C O N T R O L L I N E ( C C C L ) DA D E C O U N T Y B U L K H E A D L I N E LIMIT OF WORK LI M I T O F W O R K DA D E C O U N T Y B U L K H E A D L I N E 46 ' - 0 " O F F D S E T F R O M E C L L I N E FL O O D Z O N E X FL O O D Z O N E A E (E L 8 ) ( N . G . V . D 1 9 2 9 ) FLOOD ZONE X FLOOD ZONE AE (EL 8) (N.G.V.D. 1929) FLOOD ZONE VE (EL 10) (N.G.V.D. 1929) PHASE 1 LINE allowing 300' with for phase1 SETBACK SETBACK ER O S I O N C O N T R O L L I N E EROSION CONTROL LINE R TREE #37 PALM TO BE RELOCATED R TREE #39 PALM TO BE RELOCATED R TREE #40 PALM TO BE RELOCATED R TREE #41 PALM TO BE RELOCATEDR TREE #42 PALM TO BE RELOCATED R TREE #43 PALM TO BE RELOCATED R TREE #44 PALM TO BE RELOCATED R TREE #45 PALM TO BE RELOCATED R TREE #46 PALM TO BE RELOCATED R TREE #47 PALM - TO BE RELOCATED R TREE #48 PALM TO BE RELOCATED R TREE #49 PALM - TO BE RELOCATED R TREE #50 PALM - TO BE RELOCATED R TREE #51 PALM - TO BE RELOCATED R TREE #52 PALM - TO BE RELOCATED R TREE #38 PALM TO BE RELOCATED DUNE REMOVAL FUTURE BEACH ACCESS DUNE REMOVAL FOUND NAIL & DISK LB3653 (3/24/15) CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-1.000.00 WEST8 1/20"-1' 0" W8 TREE RELOCATION PLAN W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 FIRE HYDRANT FIRE HYDRANT FIRE CONNECTION STORM MANHOLE CATCH BASIN INLET STORM MANHOLE STORM MANHOLE CA T C H B A S I N I N L E T SANITARY MANHOLE E E E E E E E E E E E E E E E E E E E E E E E E E E E E C O L L I N S A V E N U E EROSION CONTROL LINE OF THE ATLANTIC OCEAN PLAT BOOK 134 PAGE 47 DA D E C O U N T Y B U L K H E A D L I N E PL A T B O O K 7 4 P A G E 1 BENCHMARK ELEVATION MIAMI-DADE COUNTY #A-5-R EA S T L I N E O F T R A C T H PL A T B O O K 4 4 P A G E 4 2 EA S T L I N E O F T R A C T I PL A T B O O K 4 4 P A G E 4 2 244.35' 236.47'237.69' FOUND 1/2" PIPE & CAP LB3653 (3/24/15) FOUND 1/2" PIPE & CAP LB3653 (3/24/15) FOUND 1/2" PIPE & CAP LB3653 (3/24/15) 4' FO U N D N A I L & D I S K WI T N E S S C O R N E R 4. 0 2 ' O F F S E T L B 3 6 5 3 ( 3 / 2 4 / 1 5 ) FOUND SPIKE & DISK LB3653 (3/24/15) FOUND NAIL & DISK LB3653 (3/24/15) FOUND NAIL & DISK 4' S86°53'43"W S0 3 ° 0 1 ' 3 4 " W 43 5 . 8 1 ' N0 3 ° 3 6 ' 2 2 " E 20 2 . 6 7 ' N0 1 ° 3 0 ' 0 5 " E 23 2 . 7 9 ' 474.16'N86°53'43"E 469.99' 5 . 0 0 6. 0 0 6 . 0 0 5. 0 0 4. 0 0 3. 0 0 2. 0 0 7. 0 0 7. 0 0 7. 0 0 7 . 0 0 4.3 ' BU I L D I N G SO U T H 4.0 ' BU I L D I N G SO U T H 4.0 ' WA L L NO R T H 4.1 ' BU L K H E A D NO R T H 5.7 ' WA L L NO R T H 4.0 ' FE N C E NO R T H 2.0 ' WA L L NO R T H 1.0 ' FE N C E NO R T H 3.0 0 5 . 0 0 5.0 0 7 . 0 0 7. 0 0 7.00 7.00 4.0 0 6.0 0 6.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 351.7' MARERAS ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ OUTDOOR DINNING KIDS POOL SUN DECK SUN DECK MAIN POOL EVENTS FLEXIBLE SPACE RESIDENTIAL POOL HAMMOCK RESIDENTIAL POOL HAMMOCK TERRACE PEDESTRIAN SERVICE/LOADING LAWN TERRACE ESPLANADE ESPLANADE SHADE STRUCTURE SHADE STRUCTURE BAR/GRILL DUNES DUNES DUNES TERRACE ENNTREE DROP - OFF TOWER 1 DROP - OFF TOWER 2 1 1 1 1 1 1 1 1 1 1 SUN DECK SUN DECK SUN DECK PATIO / COUTYARD SUN DECK BEACH ACCESS PRIVATE ACCESS DUNES DADE COUNTY BULKHEAD LINE PLAT BOOK 74 PAGE 1 Tower Setback50' Porte Cochere 46'-0" OFFSET FROM ECL LINE TO W E R S E T B A C K PO D I U M S E T B A C K LI M I T O F W O R K CO S T A L C O N S T R U C T I O N C O N T R O L L I N E ( C C C L ) DA D E C O U N T Y B U L K H E A D L I N E LIMIT OF WORK LI M I T O F W O R K DA D E C O U N T Y B U L K H E A D L I N E 46 ' - 0 " O F F D S E T F R O M E C L L I N E FL O O D Z O N E X FL O O D Z O N E A E (E L 8 ) ( N . G . V . D 1 9 2 9 ) FLOOD ZONE X FLOOD ZONE AE (EL 8) (N.G.V.D. 1929) FLOOD ZONE VE (EL 10) (N.G.V.D. 1929) PHASE 1 LINE allowing 300' with for phase1 SETBACK ER O S I O N C O N T R O L L I N E EROSION CONTROL LINE 70'-3" 10'20' R15' 67'-1" 85' 11'45'-7" 11'-11" 21'-1" 33' 66' 10' 16'-9" 29'-1" 46'-1" 102'-3" 11' 18'17' 211'-10" 71'-6" 28' 106'-9" 10'-8" 49'-5" 79'-8" 97'-2" 38'-11" 31'-7" 46'-10" 50'-2" 38'-5" 44'-7" 26'-11" 40'-9" 25' 50'-1" 6' 10'-3" 17'-2" 30'-2" 72' FOUND NAIL & DISK LB3653 (3/24/15) CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-1.100.00 WEST8 1/20"-1' 0" W8 LANDSCAPE LAYOUT PLAN W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 MATERIALS LEGEND CODE ITEM DESCRIPTION SURFACE Application: drop off / welcome arrival Color: dark grey Application: drop off / welcome arrival Color: light grey Application: Pool deck / Outdoor amenities Color: natural wood Application: Beach easement path Color: Terracota Application: Esplanade Color: natural Application: Vantage / Podium Hall Color: natural grey Application: Pool wet deck / Pedestrian Access Color: white Application: Service / Loading Driveway Color: natural black Application: Hammock Grove Areas Color: natural Granite Cobble Stone / Rough Texture Granite Cobble Stone / Smooth Texture Decking - IPE Integral Color Concrete / DG decomposed Granite Granite Slabs White Concrete Asphalt Sand Concrete Coating 15,119 sq.ft 18,504 sq.ft 12,684 sq.ft 12,684 sq.ft 5,890 sq.ft 2,341 sq.ft 2,127 sq.ft 9,715 sq.ft 4,595 sq.ft GCR GCS DCK CC DCG GS WC AS SN 10'-0" sf MEP 668 non-GFA sf Toilets 538 GFA sf MEP 1308 non-GFA sf Lobby - Concierge 2807 GFA sf Lounge - Breakfast - Library 2389 GFA sf Lift Lobby 642 GFA sf Fire L. 152 non-GFA sf Circulation 858 GFA sf FCC 244 non-GFA sf Valet 315 GFA sf Toilets 434 GFA sf Specialty Restaurant 1500 GFA sf Corridor 887 GFA sf Toilets 439 GFA sf Lift Lobby 587 GFA sf Lift Lobby 637 GFA sf Club Room 5059 GFA sf MEP 1157 non-GFA sf HOA 1571 GFA sf Lobby - Concierge 3335 GFA sf Fire L. 160 non-GFA sf Fire L. 160 non-GFA sf Lobby 1998 GFA sf Stair 537 GFA sf Stair 219 GFA sf Stair 546 GFA sf Specialty R. FOH BOH 1568 GFA sf Lounge Cafe 900 GFA sf Lounge C. - Hostess 213 GFA sf Lounge C. BOH 384 GFA EL. S.EL. EL. S.EL. EL. H.EL. H.EL. H.EL.EL. EL. EL. S.EL. EL. EL. DN DN UP UP UP UP STR. STR. STR. STR. EL. EL. S.EL. STR. UP DN STR. UP EL. Ra m p 1 4 % 7% b l e n d Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" FIRE ENGINE SET-UP SITE B FIRE ENGINE SET-UP SITE A L2 L3 L2 Level 2 ELEV. +26'-0" Level 2 ELEV. +27'-8" Level 2 ELEV. +27'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +27'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" 12'- 0 " 15'- 0 " 12'- 0 " 12'- 0 " 8'-0 " 12'- 0 " 12'- 0 " 12'-0" 30'-0" 12'-0"12'-0"8'-0" 12'-0"12'-0"8'-7" 47'-0" 21 ' - 0 " 10'-0 " 10'-0" 47'-0" 21 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " 10'- 0 " R1 5 ' - 0 " R15'- 0 " R15'-0 " R 5 0 ' - 0 " R 5 0 ' - 0 " R50 ' - 0 " R 5 0 ' - 0 " 15'- 0 " DADE COUNTY BULKHEAD LINE PLAT BOOK 74 PAGE 1 Tower Setback50' Porte Cochere 47'-0" OFFSET FROM ECL LINE BULKHEAD LINE 47'-0" OFFSET FROM ECL LINE FOUND NAIL & DISK LB3653 (3/24/15) FIRE HYDRANT FIRE HYDRANT FIRE CONNECTION STORM MANHOLE CATCH BASIN INLET STORM MANHOLE STORM MANHOLE CA T C H B A S I N I N L E T SANITARY MANHOLE E E E E E E E E E E E E E E E E E E E E E E E E E E E E C O L L I N S A V E N U E EROSION CONTROL LINE OF THE ATLANTIC OCEAN PLAT BOOK 134 PAGE 47 DA D E C O U N T Y B U L K H E A D L I N E PL A T B O O K 7 4 P A G E 1 BENCHMARK ELEVATION MIAMI-DADE COUNTY #A-5-R EA S T L I N E O F T R A C T H PL A T B O O K 4 4 P A G E 4 2 EA S T L I N E O F T R A C T I PL A T B O O K 4 4 P A G E 4 2 5 . 0 0 6. 0 0 6 . 0 0 5. 0 0 4. 0 0 3. 0 0 2. 0 0 7. 0 0 7. 0 0 7. 0 0 7 . 0 0 4.3 ' BU I L D I N G SO U T H 4.0 ' BU I L D I N G SO U T H 4.0 ' WA L L NO R T H 4.1 ' BU L K H E A D NO R T H 5.7 ' WA L L NO R T H 4.0 ' FE N C E NO R T H 2.0 ' WA L L NO R T H 1.0 ' FE N C E NO R T H 3.0 0 5 . 0 0 5.0 0 7 . 0 0 7. 0 0 7.00 7.00 4.0 0 6.0 0 6.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 351.7' MARERAS ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ FOUND NAIL & DISK LB3653 (3/24/15) Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Chamfer ELEV. +12'-0"ELEV. +7'-7" ELEV. +8'-7" ELEV. +9'-0" ELEV. +8'-9" ELEV. +8'-1" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" ELEV. +14'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" ELEV. -8'-7" Level 1 ELEV. +15'-8" UP DN R a m p 1 4 % 7 % B l e n d 7% B l e n d R a m p 1 4 % 7% Blend DN UP DN 7% B l e n d 7% B l e n d UP DN UP Ramp 1:20 Slope R a m p 1 4 % Ra m p 1 4 % Ramp 8%DN Ramp Lenght 193'- 4" Ra m p 1 4 % 7% b l e n d Ramp Beach Easement 1:20 Slope Ramp length 139'-4" OUTDOOR DINNING KIDS POOL SUN DECK MAIN POOL EVENTS FLEXIBLE SPACE RESIDENTIAL POOL HAMMOCK VANTAGE WELCOME RESIDENTIAL POOL HAMMOCK TERRACE PEDESTRIAN SERVICE/LOADING LAWN HUB / PODIUM ARRIVAL TERRACE ESPLANADE ESPLANADE SHADE STRUCTURE SHADE STRUCTURE BAR/GRILL DUNES DUNES DUNES TERRACE ENNTREE DROP - OFF TOWER 1 DROP - OFF TOWER 2 WELCOME ARRIVAL 1 1 1 1 1 1 1 1 1 1 SUN DECK BEACH ACCESSBEACH ACCESS PRIVATE ACCESS MATERIALS LEGEND MOUNTABLE CURB AT THIS LOCATION MOUNTABLE CURB AT THIS LOCATION MOUNTABLE CURB AT THIS LOCATION MOUNTABLE CURB AT THIS LOCATION CIP CONC CURB. TYP AS ASPHALT AS ASPHALT GS GRANITE SLABS GCR GRANITE COBBLESTONE- ROUGH TEXTURE GCS GRANITE COBBLESTONE- SMOOTH TEXTURE CC INTEGRAL COLOR CONCRETE AS PER CITY STANDARD CC INTEGRAL COLOR CONCRETE AS PER CITY STANDARD GCR GRANITE COBBLESTONE- ROUGH TEXTURE GCS GRANITE COBBLESTONE- SMOOTH TEXTURE DCG DG DECOMPOSED GRANITE DCG DG DECOMPOSED GRANITE DCG DG DECOMPOSED GRANITE GCR GRANITE COBBLESTONE- ROUGH TEXTURE GCS GRANITE COBBLESTONE- SMOOTH TEXTURE DCK DECKING - IPE DCK DECKING - IPE DCK DECKING - IPE DCK DECKING - IPE SN SAND SN SAND WC WHITE CONCRETE WC WHITE CONCRETE WC WHITE CONCRETE CC INTEGRAL COLOR CONCRETE- CONCRETE COATING DCK DECKING - IPE WC WHITE CONCRETE GCR GRANITE COBBLESTONE- ROUGH TEXTURE GCS GRANITE COBBLESTONE- SMOOTH TEXTURE SIDEWALK AS PER CITY OF SUNNY ISLES SPECIFICATION SIDEWALK AS PER CITY OF SUNNY ISLES SPECIFICATION BENCH TRASH BIN AS PER CITY STANDARD SIGNAGE AS PER CITY STANDARD BEACH SHOWER AS PER CITY STANDARD BIKE RACK AS PER CITY STANDARD SEATING EDGESEATING EDGE SEATING EDGESEATING EDGESEATING EDGESEATING EDGE TRASH BIN AS PER CITY STANDARD BEACH ACCESS SIGNAGE 102'-3" 76'-5" 83'-6" 28'-5" 74'-7" 31'-11" 20'-2" 193'-4"166'-2"100'-5" 193'-4"107'-3"112'-4"30'-5" 25'20'15'20'25'20'15' 20'15' 20' 15' CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-2.000.00 WEST8 1/20"-1' 0" W8 LANDSCAPE MATERIALS PLAN W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 Jamie Maslyn Larson AW Paurotis Palm CN Coconut Palm PM Date Palm CU Seagrape Tree YA Yucca Aloifolia DR Royal Ponciana CET S.Buttonwood *Note: refer to planting schedule FIRE HYDRANT FIRE HYDRANT FIRE CONNECTION E E E E E E E E E E E E E E E E E E E E E E E E E E E E C O L L I N S A V E N U E EROSION CONTROL LINE OF THE ATLANTIC OCEAN PLAT BOOK 134 PAGE 47 DA D E C O U N T Y B U L K H E A D L I N E PL A T B O O K 7 4 P A G E 1 BENCHMARK ELEVATION MIAMI-DADE COUNTY #A-5-R EA S T L I N E O F T R A C T H PL A T B O O K 4 4 P A G E 4 2 EA S T L I N E O F T R A C T I PL A T B O O K 4 4 P A G E 4 2 5 . 0 0 6. 0 0 6 . 0 0 5. 0 0 4. 0 0 3. 0 0 2. 0 0 7. 0 0 7. 0 0 7. 0 0 7 . 0 0 4.3 ' BU I L D I N G SO U T H 4.0 ' BU I L D I N G SO U T H 4.0 ' WA L L NO R T H 4.1 ' BU L K H E A D NO R T H 5.7 ' WA L L NO R T H 4.0 ' FE N C E NO R T H 2.0 ' WA L L NO R T H 1.0 ' FE N C E NO R T H 3.0 0 5 . 0 0 5.0 0 7 . 0 0 7. 0 0 7.00 7.00 4.0 0 6.0 0 6.0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 351.7' MARERAS ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ ZZ EVENT LAWN ST.AGUSTINE GRASS SUNDECK LAWN ST.AGUSTINE GRASS LAWN ST.AGUSTINE GRASS LAWN SUNDECK LAWN ST.AGUSTINE GRASS SUNDECK LAWN ST.AGUSTINE GRASS PROPOSED DUNES SEA OATS PROPOSED DUNES SEA OATS PROPOSED DUNES SEA OATS PROPOSED DUNES SEA OATS EXTENDED SAND BED PROPOSED PLANTING BED PLANTING BED GREEN BUFFER HEDGE GREEN BUFFER HEDGE GREEN BUFFER HEDGE GREEN BUFFER HEDGE VEGETATION CLUSTER / CLUSIA VEGETATION CLUSTER / CLUSIA EXTENSION OF THE EXISTING STREET PROFILE VEGETATION DATE PALMS GREEN BUFFER WALL MITIGATION GREEN BOTTONWOOD TREE ROW OF LINEAR HEDGES FICUS GREEN ISLAND REINFORCED PLANTING BED FOR FIRE ENGINE PLANTING BED PLANTING BED PLANTING BED PLANTING BED PLANTING BED OUTDOOR DINNING KIDS POOL SUN DECK SUN DECK MAIN POOL EVENTS FLEXIBLE SPACE RESIDENTIAL POOL HAMMOCK VANTAGE WELCOME RESIDENTIAL POOL HAMMOCK TERRACE PIAZZA PEDESTRIAN SERVICE/LOADING LAWN HUB / PODIUM ARRIVAL GREEN BUFFER TERRACE ESPLANADE ESPLANADE GREEN BUFFER SHADE STRUCTURE SHADE STRUCTURE BAR/GRILL DUNES DUNES DUNES PATIO / COURTYARD TERRACE ENNTREE DROP - OFF TOWER 1 DROP - OFF TOWER 2 WELCOME ARRIVAL 1 1 1 1 1 1 1 1 1 1 SUN DECK SUN DECK SUN DECK SUN DECK SUN DECK BEACH ACCESS UP DN R a m p 1 4 % 7 % B l e n d 7% B l e n d R a m p 1 4 % 7% Blend DN UP DN 7% B l e n d 7% B l e n d UP DN UP Ramp 1:20 Slope R a m p 1 4 % Ra m p 1 4 % Ramp 8%DN Ramp Lenght 193'- 4" Ra m p 1 4 % 7% b l e n d Tower Setback Ramp Beach Easement 1:20 Slope SETBACK Ramp length 139'-4" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0"ELEV. +7'-7" ELEV. +8'-7" ELEV. +9'-0" ELEV. +8'-9" ELEV. +8'-1" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Chamfer ELEV. +12'-0" ELEV. +8'-7" ELEV. +8'-1" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +14'-8" Level 1 ELEV. +15'-8" ELEV. -8'-7" Level 1 ELEV. +15'-8" CNCN C N CNCN C N C N C N CU CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN CU CN CN CU CU CU CN CN CN CN CN CN CN CN CN CN CN CN CN CU CU CU CU CU PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM DR DR CET YA YA YA YA YA CET CU CN CN CU CU YA YA YA YA YA PM PM PM PM PM PM PM PM DR CET DR CET CET CU CU CET YA YA YA YA YA YA YA YAYAYA CET YA YA YA YA YA YA YA YAYA YA PM PM 25'20'15' 20'15' 20'20' 15' CET 39 PM 6 CET 43 YA 4 YA 7 AW 11 CN 2 CU 1 CN 1 CN 3 CN 2 YA 2 1 PM 3 CU 1 CU 1 1 PM 3 YA 4 1 YA 4 CN 3 YA 2 CN 3 CU 1 CN 1 CU 1 1 CN 2 CN 1 DR 1 CU 2 N 4 CU 1 1 CN 2 CN 4 AW 1 AW 6 AW 2 CU 1 AW 1 CN 2 CU 1 CN 4 CN 1 CN 1 1 CU 1 1 CU 1 CET 1 CU 1 CN 1 CU 1 PM 1 PM 1 PM 4 PM 1 3 YA CET CET CET CET 1 CET CU AW 12 AW 13DR 1 DR 1 DR CN 1 CU 1 CU 5 PM 4 CET 1 FM 1,812 FM 3,723 FM 3,385 FM 1,578 FM 1,165 AG 815 AG 559 AG 492 AG 616 AG 1,208 YA 4 FM 1,638 AG 677 PM 1 PM 1 ARG 2,321 ARG 1,351 ARG 63 SM 175 SM 340 CR 487 CI 510 LR 261 CR 703 SR 243 SR 425 SR 540 CR 823 SR 345 SM 431 SM 120 ARG 2,507 CI 482 CR 683 FM 232 FOUND NAIL & DISK LB3653 (3/24/15) CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-3.000.00 WEST8 1/20"-1' 0" W8 LANDSCAPE PLANTING PLAN W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 CET PM YA DR CU CN CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-3.100.00 WEST8 1/20"-1' 0" W8 PLANTING SCHEDULE W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 KEY CODE QTY.COMMON NAME NATIVE DROUGHT SALTSPACINGHEIGHT KEY CODE QTY.BOTANICAL NAMECOMMON NAME NATIVE DROUGHT SALTHEIGHT Green Island Ficus FICUS "GREEN ISLAND" MICROCARPA 18" Perennial Peanut ARACHIS GLABRATA 6" Bay Cedar SURIANA MARITIMA 3-5' Australian Fan Palm 1-2' Orange Bird-of-Paradise STRELITZIA REGINAE 3-5' St. Augustine Grass STENOTAPHRUM SECUNDATUM SPREAD SPREAD 18" 6" 2' 2-3' 3' SPACING SHRUBS AND GROUND COVERS SCHEDULE 2,860 3,765 TREES TREE SCHEDULE CODE QTY.BOTANICAL NAME COMMON NAME NATIVE DROUGHT SALTSPREADHEIGHT AW 46 Acoelorrhaphe wrightii PAUROTIS PALM YES LOW HIGH10'-15'25' CLEAR TRUNK N/A CN 37 Cocos nucifera COCONUT PALM 20'20-30'8'-18'HIGH PM 30 Phoenix dactylifera MEDJOOL DATE PALM 18'22'18'HIGH CU 18 Coccoloba uvifera SEA GRAPE 20'20'8'HIGH YA 30 Yucca aloifolia 6'5'-20'VARIES DR 4 Delonix Regia 15'20'-25'8'MODERATE CET 82 Conocarpus erectus GREEN BUTTONWOOD 8'14'5'HIGH ROYAL PONCIANA ALOE YUCCA YES YES YES HIGH HIGH HIGH HIGH HIGH MODERATE HIGH 240 500 205 Cocoplum CHRYSOBALANUS ICACO 3-5'2-3'95 Pitch Apple CLUSIA ROSEA 3-5'3'300 Silver Saw Palmetto SERENOA REPENS 3-5'150 Sea Lavender ARGUSIA GNAPHALODES 3-5'710 Sea Oats UNIOLA PANICULATA 3-5'1-2'1350 4,973sf 32,792sf NO NO NO BOTANICAL NAME LICUALA RAMSAYI BEACH SAND N/A N/A N/A N/A N/A N/A MODERATEMODERATE 2-3' 2-3' 24" 12" NO NO HIGH MODERATE MODERATE MODERATE YES HIGH HIGH MODERATE HIGHNO NO HIGH MODERATE HIGH HIGHYES HIGH HIGHYES HIGH HIGHYES HIGH HIGHYES HIGH HIGHYES 36" 36" 36" 36" 36" 36" 24" 24" N/A Mulch Spread 3" Thick in all shrub & groundcover bedsN/A -- --- -- FM AG SR LR SR SS UP ARG SR CI CR SYMBOL LUMINAIRE SCHEDULE Qty Label Height Lumens LLF Description 40 A 15 ft 7000 0.850 SELUX OLG-R2-H070T6 (7261-70) 38 B 15 ft 3300 SELUX OLG-FW-H039T60.850 Label NUMERIC SUMMARY Cal Type Units Avg Max Min Avg/Min Illuminance Fc 1.81 6.4 0.2 Illuminance Fc 1.69 0.0 Avg/Max 9.05 0.00 32.00 0.00 A B 6.4 Custom design pole with doble Olivio Candelabra Grande (Model SX771 from Selux); height 15ft; color temperature 3500 K; distance aprox. 65-80 ft Custom design pole with doble Olivio Candelabra Medium (Model SX AE6476 from Selux); height 12ft color temperature 2500 K; distance aprox. 50ft LEGEND Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Chamfer ELEV. +12'-0"ELEV. +7'-7" ELEV. +8'-7" ELEV. +9'-0" ELEV. +8'-9" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" ELEV. +14'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" ELEV. +8'-1" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. -8'-7" Level 1 ELEV. +15'-8" C O L L I N S A V E N U E 4.3 ' BU I L D I N G SO U T H 4.0 ' BU I L D I N G SO U T H 4.0 ' WA L L NO R T H 4.1 ' BU L K H E A D NO R T H 5.7 ' WA L L NO R T H 4.0 ' FE N C E NO R T H 2.0 ' WA L L NO R T H 1.0 ' FE N C E NO R T H 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 351.7' MARERAS 25'- 0" 50'- 0" 25'- 0" DADE COUNTY BULKHEAD LINE PLAT BOOK 74 PAGE 1 Tower Setback50' Porte Cochere 46'-0" OFFSET FROM ECL LINE TO W E R S E T B A C K PO D I U M S E T B A C K LI M I T O F W O R K CO S T A L C O N S T R U C T I O N C O N T R O L L I N E ( C C C L ) DA D E C O U N T Y B U L K H E A D L I N E LIMIT OF WORK LI M I T O F W O R K DA D E C O U N T Y B U L K H E A D L I N E 46 ' - 0 " O F F D S E T F R O M E C L L I N E FL O O D Z O N E X FL O O D Z O N E A E (E L 8 ) ( N . G . V . D 1 9 2 9 ) FLOOD ZONE X FLOOD ZONE AE (EL 8) (N.G.V.D. 1929) FLOOD ZONE VE (EL 10) (N.G.V.D. 1929) PHASE 1 LINE allowing 300' with for phase1 SETBACK ER O S I O N C O N T R O L L I N E EROSION CONTROL LINE OUTDOOR DINNING KIDS POOL SUN DECK SUN DECK MAIN POOL EVENTS FLEXIBLE SPACE RESIDENTIAL POOL HAMMOCK VANTAGE WELCOME RESIDENTIAL POOL HAMMOCK TERRACE PIAZZA PEDESTRIAN SERVICE/LOADING LAWN HUB / PODIUM ARRIVAL SUN DECK GREEN BUFFER TERRACE ESPLANADE ESPLANADE GREEN BUFFER SHADE STRUCTURE SHADE STRUCTURE BAR/GRILL DUNES DUNES DUNES TERRACE ENNTREE DROP - OFF TOWER 1 DROP - OFF TOWER 2 WELCOME ARRIVAL 1 1 1 1 1 1 1 1 1 1 SUN DECK SUN DECK SUN DECK PATIO / COUTYARD BEACH ACCESS PRIVATE ACCESS FOUND NAIL & DISK LB3653 (3/24/15) Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Grade ELEV. +6'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" Chamfer ELEV. +12'-0"ELEV. +7'-7" ELEV. +8'-7" ELEV. +9'-0" ELEV. +8'-9" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" ELEV. +14'-8" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 2 ELEV. +26'-0" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Chamfer ELEV. +12'-0" Chamfer ELEV. +12'-0" Level 1 ELEV. +15'-8" Grade ELEV. +6'-0" ELEV. +8'-1" Level 1 ELEV. +15'-8" Level 1 ELEV. +15'-8" Level 1 ELEV. -8'-7" Level 1 ELEV. +15'-8" C O L L I N S A V E N U E 4.3 ' BU I L D I N G SO U T H 4.0 ' BU I L D I N G SO U T H 4.0 ' WA L L NO R T H 4.1 ' BU L K H E A D NO R T H 5.7 ' WA L L NO R T H 4.0 ' FE N C E NO R T H 2.0 ' WA L L NO R T H 1.0 ' FE N C E NO R T H 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 351.7' MARERAS 25'- 0" 50'- 0" 25'- 0" DADE COUNTY BULKHEAD LINE PLAT BOOK 74 PAGE 1 Tower Setback50' Porte Cochere 46'-0" OFFSET FROM ECL LINE TO W E R S E T B A C K PO D I U M S E T B A C K LI M I T O F W O R K CO S T A L C O N S T R U C T I O N C O N T R O L L I N E ( C C C L ) DA D E C O U N T Y B U L K H E A D L I N E LIMIT OF WORK LI M I T O F W O R K DA D E C O U N T Y B U L K H E A D L I N E 46 ' - 0 " O F F D S E T F R O M E C L L I N E FL O O D Z O N E X FL O O D Z O N E A E (E L 8 ) ( N . G . V . D 1 9 2 9 ) FLOOD ZONE X FLOOD ZONE AE (EL 8) (N.G.V.D. 1929) FLOOD ZONE VE (EL 10) (N.G.V.D. 1929) PHASE 1 LINE allowing 300' with for phase1 SETBACK ER O S I O N C O N T R O L L I N E EROSION CONTROL LINE OUTDOOR DINNING KIDS POOL SUN DECK SUN DECK MAIN POOL EVENTS FLEXIBLE SPACE RESIDENTIAL POOL HAMMOCK VANTAGE WELCOME RESIDENTIAL POOL HAMMOCK TERRACE PIAZZA PEDESTRIAN SERVICE/LOADING LAWN HUB / PODIUM ARRIVAL SUN DECK GREEN BUFFER TERRACE ESPLANADE ESPLANADE GREEN BUFFER SHADE STRUCTURE SHADE STRUCTURE BAR/GRILL DUNES DUNES DUNES TERRACE ENNTREE DROP - OFF TOWER 1 DROP - OFF TOWER 2 WELCOME ARRIVAL 1 1 1 1 1 1 1 1 1 1 SUN DECK SUN DECK SUN DECK PATIO / COUTYARD BEACH ACCESS PRIVATE ACCESS FOUND NAIL & DISK LB3653 (3/24/15) CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-4.000.00 WEST8 1/20"-1' 0" W8 SITE LIGHTING PLAN W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 A A Ø5 14 4 14 4 24 ENSAMBLAJE DE ELEMENTOS Ø2 53 18 12 7 METAL LIGHT POSTSIDEELEVATIONFRONT ELEVATION ma x . 4 0 ° OLIVIO CANDELABRA medium ·model: SX 773 (simple fixture) ·light: HIT 150W ·reflector: asymmetric road ·color: Selux Corporation Silver 338/90310 ·amount: -- METAL FOOT (follow Selux specifications for detailed dimensions) 12 5 10 10 3 CASTED PIECE FOR BASE PROTECTION (follow Selux specifications for detailed dimensions) SELUX CANDELABRA OLIVIO GRANDE (MODEL SX773) METAL LIGHT POLE CASTED PROTECTION PIECE OF THE BASE CONCRETE FOUNDATION CORRUGATED STEEL REINFORCEMENT METALLIC BASE 3" MULCH LAYER; DO NOT PLACE MULCH IN CONTACT WITH TRUNK FLARE WIRE TO NEXT LIGHT POLE TOP VIEW A ma x . 4 0 ° METAL LIGHT POST Ø5 Ø2 18 9 18 9 24 OLIVIO CANDELABRA GRANDE ·model: SX 771 (double fixture) ·light: HIT 150W ·reflector: asymmetric road ·color: Selux Corporation Silver 338/90310 ·amount: -- METAL FOOT (follow Selux specifications for detailed dimensions) SIDE ELEVATION FRONT ELEVATION ASSEMBLY OF THE ELEMENTS 53 18 12 7 12 5 10 10 3 CASTED PIECE FOR BASE PROTECTION (follow Selux specifications for detailed dimensions) 120° TOP VIEW CASTED PROTECTION PIECE OF THE BASE CONCRETE FOUNDATION CORRUGATED STEEL REINFORCEMENT METALLIC BASE SELUX CANDELABRA OLIVIO GRANDE (MODEL SX771) METAL LIGHT POLE 3" MULCH LAYER; DO NOT PLACE MULCH IN CONTACT WITH TRUNK FLARE WIRE TO NEXT LIGHT POLE CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-4.100.00 WEST8 1/2''=1'0'' W8 TYPICAL DETIAL LIGHTING FIXTURE W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 1 OLIVIO CANDELABRA GRANDE, DOBLE FIXTURE 1/2''=1'0'' 2 OLIVIO CANDELABRA MEDIUM, SIMPLE FIXTURE 1/2''=1'0'' SPECIFICATIONS 1.Housing -Pressure die-cast aluminum two-piece, single captiveset screw for easy access. 2.Gasketing -Silicone gasket between fixture housing and lens base provide IP67 level ingress protection. 3.Lens -Tempered clear glass lens held by mechanical fasteners.Linear spread lens, color filter glass,dichroic filters or honeycomb louver available as accessories. 4.Optics -Precision formed, high performance reflector, in highly specular or diffuse finishes. Constructed of high purity aluminum with chemically brightened and anodized finish to produce optimum reflectivity for specified distributions. 5.Lamping -As indicated. Selux provided lamps use brand name manufacturers. 6.Socket -2-pin G12 base 5kV ceramic/PPS lamp holder for T-6/T- 7.5 lamps; 2-pin G8.5 base, 5kV ceramic lamp holder for T-4/T-4.5 lamps. 7.Ballasting -Electronic, low THD, high power factor ballast for HID lamps. 8.Arm -45 degree curved aluminum Fixture head joint provides tilt-swivel range from 0° to 175°, as well as 360° rotation. Locks down with set screws. 9.Pole Fitter -Cast aluminum mounting arms include tenon that is inserted into a 2.0" I.D. pole and locked into place with set screws. Exterior Luminaire Finish -Selux utilizes a high quality Polyester Powder Coating. All Selux luminaires and poles are finished in our Tiger Drylac certified facility and undergo a five stage intensive pretreatment process where product is thoroughly cleaned, phosphated and sealed. Selux powder coated products provide excellent salt and humidity resistance as well as ultra violet resistance for color retention. All products are tested in accordance with test specifications for oatings from ASTM and PCI. Standard exterior colors are White Black (BK), Bronze (BZ), and Silver (SV). Selux premium colors are available, please specify from your Selux color selection Hot Dip Galvanized finish on all steel parts also available. SPECIFICATIONS 1.Housing -Pressure die-cast aluminum two-piece, single captive set screw for easy access. 2.Gasketing -Silicone gasket between fixture housing and lens base provide IP67 level ingress protection. 3.Lens -Tempered clear glass lens held by mechanical fasteners. Linear spread lens, color filter glass, dichroic filters or honeycomb louver available as accessories. 4.Optics -Precision formed, high performance reflector, in highly specular or diffuse finishes. Constructed of high purity aluminum with chemically brightened and anodized finish to produce optimum reflectivity for specified distributions. 5.Lamping -As indicated. Selux provided lamps use brand name manufacturers. 6.Socket - 2-pin G12 base 5kV ceramic/PPS lamp holder for T-6/T-7.5 lamps. 7.Ballasting -Electronic, low THD, high power factor ballasts for 39 watt and 70 watt T6 lamps; or magnetic, high power factor, core and coil ballast for 150 watt T6 lamp. 8.Arm -45 degree curved aluminum Fixture head joint provides tilt-swivel range from 0° to 175°, as well as 360° rotation. Locks down with set screws. 9.Pole Fitter -Cast aluminum mounting arms include tenon that is inserted into a 2.0" I.D. pole and locked into place with set screws. Exterior Luminaire Finish -Selux utilizes a high quality Polyester Powder Coating. All Selux luminaires and poles are finished in our Tiger Drylac certified facility and undergo a five stage intensive pretreatment process where product is thoroughly cleaned, phosphated and Selux powder coated products provide excellent salt and humidity resistance as well as ultra violet resistance for color retention. All products are tested in accordance with test specifications for coatings from ASTM and PCI. Standard exterior colors are White (WH), Black (BK), Bronze and Silver (SV). Selux premium color (SP) are available, please specify from your Selux color selection guide. Hot Dip Galvanized finish (GV) on all steel parts also available. 5' DATE PALM TREE PER PLANTING PLAN 3" DEPTH MULCH - ENTIRE PLANTING BED PRIOR TO PLANTING, REMOVEPLANT FROM CONTAINER AND GENTLY COMB OUT ROOTS CURB ROAD GRANITE CURBSTONE ADJACENT WALK COMPACTED SUBGRADE, TYP. 36" MIN DEPTH PLANTING SOIL CRUSHED AGGREGATE BASE COURSE SILVA CELLS, TYP. CL HARDWOOD TREE PER PLANS -SET PLUMB DUCKBILL ANCHOR SYSTEM ON GRADE OR APPROVED EQUAL SECTION 3" MULCH LAYER; DO NOT PLACE MULCH IN CONTACT WITH TRUNK FLARE COMPACTED MOUND COMPACTED MOUND COMPACTED SUBGRADE, TYP. 1' SODDED LAWN MIN. 4" 90% ORTONA SAND AND 10% EVERGLADES MUCK MIN. 8" ORTONA SAND TOPSOIL MIN. 24" PLANTING SOIL 3" DEPTH MULCH - ENTIRE PLANTING BED PRIOR TO PLANTING, REMOVE PLANT FROM CONTAINER AND GENTLY COMB OUT ROOTS FINISH GRADE PLANTING SOIL - SEE SOILS PLAN FOR PLANTING SOIL DEPTH COMPACTED SUB-GRADE 2X DIA ROOTBALL NOTE: REMOVE ALL WIRE AND PLASTIC TAGS OR SYNTHETIC MATERIAL FROM TREE BRANCHES AND TRUNK PRIOR TO PLANTING. COMPACTED MOUND COMPACTED SUBGRADE ROOTBALL; IF BALLED AND BURLAPPED, CUT & REMOVE BURLAP FROM TOP & SIDE OF ROOTBALL PRIOR TO PLANTING, UNWRAP OR DISTURB ROOTBALL TO ENCOURAGE ROOT DEVELOPMENT PLANTING SOIL - SEE SOILS PLAN FOR PLANTING SOIL DEPTH HOLE TO BE DUG TO MINIMUM 2X DIAMETER OF ROOTBALL 3" MULCH LAYER; DO NOT PLACE MULCH IN CONTACT WITH TRUNK FLARE TOP OF ROOTBALL TO BE FLUSH WITH FINISH GRADE SHRUB SHALL BE SET PLUMB PRUNE ANY BROKEN OR DAMAGED BRANCHES CL DATE PALM TREE PER PLANS -SET PLUMB DUCKBILL ANCHOR SYSTEM ON GRADE OR APPROVED EQUAL SECTION 3" MULCH LAYER; DO NOT PLACE MULCH IN CONTACT WITH TRUNK FLARE COMPACTED MOUND COMPACTED MOUND COMPACTED SUBGRADE, TYP. 12-18" BFG PALM TREE PER PLANS-SET PLUMB PATENTED OASIS PALM TREE ANCHORING SYSTEMS US638974381 WITH 3-4 LOOPS AND 1" TO 2" CAM OR RATCHET BUCKLES IN NUETRAL COLORS (3) 1/8"-1/4" CABLE CLAMPS OR SLEEVES PER CABLE, DEPENDING ON CABLE SIZE 1/8"-1/4" CABLE, 13'-18' LONG WITH CUSTOM LENGTHS UPON REQUEST - ATTACHED AT WELDED EYE 2' TO 4' LENGTH W/ 1 2"-3 4" SHAFT EARTH AUGER C/W 4-6" HELIX SCREW SECTION PLAN ROOTBALL GROWING MEDIUM ASSEMBLY COMPONENTS - SEE ABOVE SECTION TREE PIT NOTE: HARDWARE SIZES ON DETAILS CAN BE SPECIFIED BASED ON THE SIZE OF PLANTS MATERIALS AND SPECIFIC LOAD REQUIREMENTS. ALL PARTS ARE SUPERIOR QUALITY MULTI-PART SYSTEMS WHICH INCLUDE EVERYTHING FOR THE SECURE ANCHORING OF LARGE PALMS TREES. THE BELT WHICH GOES AROUND THE TREE IS HIGH-STRENGTH WEBBING WITH A RACHET OR QUICK-LOCK CAM BUCKLE. ATTACHED ARE THREE TO FOUR LOOPS WITH D-RINGS ON THE BELTS DEPENDING ON THE KIT SIZE WITH CABLES, TURNBUCKLES AND DUCKBILL ANCHORS. THE CONTRACTOR SHALL COORDINATE WITH ANCHORING SYSTEM MANUFACTURER TO PURSUE FEASIBILITY OF USE OF BIO-DEGRADABLE STRAPPING AROUND ROOTBALL SYSTEM.THESE STRAPS SHALL MEET OR EXCEED THE SAME STRINGENT STRUCTURAL REQUIREMENTS AS STANDARD STRAPS.THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR NEW BIO-DEGRADABLE STRAPPING TO LANDSCAPE ARCHITECT FOR APPROVAL BEFORE USE. ALL COMPACTED LIMEROCK ROAD BASE MUST BE REMOVED FROM ALL LANDSCAPE AREAS 3" MULCH LAYER; DO NOT PLACE MULCH IN CONTACT WITH TRUNK FLARE CHATEAU GROUP FORTUNE INTERNATIONAL GROUP WEST 8/ROSENBERG GARDNER DESIGN VSN ENGINEERING DESIMONE JPG ENGINEERING GROUP VARADERO UNSTUDIO/TRACHTENBERG ODP ARCHITECTS L-5.000.00 WEST8 N/A W8 DETIAL TYPICAL PLANTING W8 - T 1 4 7 PRELIMINARY 11/04/2015 daterev.issuance id. & description keyplan 1000 E Hallandale Beach Blvd. Hallandale Beach, FL 33009 T +1 (954) 455 8788 1300 Brickell Avenue Miami, FL 33131 T +1 (305) 351 1000 Date Originator Scale Drawn by Number Title client landscape architect 333 Hudson Street, Suite 905 New York, NY 10013 civil engineer structural engineer mechanical & electrical engineer 8550 W. Flagler St. #113 Miami, FL 33144 800 Brickell Ave. #600 Miami, FL 33131 3553 NW 79th Ave. Miami, FL 33122 check 18801 Collins Avenue Sunny Isles Beach, FL 33160 Project Name Stadhouderskade 113, PO box 75381, 1070 AJ Amsterdam T +31 (0)20 570 2040The Netherlands design consultant 6310 NW 2nd Ave. Miami, FL 33150 T +1 (786) 708 2474 GENERAL NOTES architect of record 2432 Hollywood Blvd. Hollywood, FL 33020 17670 NW 78TH Ave. Hialeah, FL 33015 T +1 (305) 392-1016 T +1 (954) 518 0833 T +1 (305) 441 0755 T +1 (305) 436 9292 T +1 (305) 551 6267 T +1 (212) 285 0088 client Jo b # : Jamie Maslyn Larson FL. Landscape Architect Reg. No: LA 6667052 3 DATE PALM PLANTING AND ANCHORING, TYP ON GROUND 3/8" = 1'-0" 6 TROPICAL SHRUB PLANTING, TYP 1" = 1'-0" 5 GROUNDCOVER PLANTING, TYP 1" = 1'-0" 4 STREET TREE PLANTING, TYP 3/8" = 1'-0" 1 PLANTING AND ANCHORING, TYP ON STRUCTURE 3/8" = 1'-0" 7 SODDED LAWN, TYP 1" = 1'-0" 2 HARDWOOD PLANTING AND ANCHORING, TYP ON GROUND 3/8" = 1'-0" SX.770 SX.770 SX . 7 7 0 SX . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 SX . 7 7 0 SX . 7 7 0 SX . 7 7 0 SX . 7 7 0 SX . 7 7 0 S X . 7 7 0 S X . 7 7 0 S X . 7 7 0 SX.770SX.770SX.770SX.770 SX.770 SX.770SX.771 SX.770 SX.770 SX.770 S X . 7 7 0 SX.770SX.770SX.770 SX.770SX.770SX.770SX.770SX.771 SX.771 SX.771 SX.771 SX.771 S X . 7 7 1 S X . 7 7 1 S X . 7 7 1 S X . 7 7 1 S X . 7 7 1 S X . 7 7 1 SX.771SX.771SX.771SX.771 SX . 7 7 1 SX . 7 7 1 SX . 7 7 1 SX . 7 7 1 SX . 7 7 1 SX . 7 7 1 SX.771SX.771SX.771SX.771 SX.771 SX.771 SX.771 SX.771 SX.771 SX.771 SX.771 S X . 7 7 1 S X . 7 7 1 S X . 7 7 1 SX.771 SX.771 SX.771 SX.771 A AAA A A A A A A B B A A A A A A A A A A A A A A A A A A A AAAA A A A A A A B B B B B B B B B B B B B B B B B B B B B BB B B B BBBB B BB B BB E B # 0 0 0 0 7 7 8 8 d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 J o s e G . P u i g J r . F l o r i d a P E . N o : 4 9 1 4 8 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t 3 3 3 H U D S O N S T R E E T , S U I T E 9 0 5 N E W Y O R K , N Y 1 0 0 1 3 U S A . c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J P G E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 1 ( 2 1 2 ) 2 8 5 0 0 8 8 c l i e n t H e c t o r M . B l a s c o F l o r i d a P E . N o : 5 6 1 1 5 S I T E P L A N P H O T O M E T R I C E . 2 - 0 0 1 J G P 1 0 / 0 1 / 2 0 1 5 1 / 2 0 " = 1 ' - 0 " T C CONDOM � VS 18801 COLL I NS AVENUE CITY OF SL' \Y ISLES BEACH 9 FLORIDA OWNER: LA PLAYA DE VARADERO I V 1300 BRICKELL AVENUE MIAMI, FLORDA 33131 C 7 LEGAL DESCRIPTION: Parcel 1: All of LA PLAYA DE VARADERO IV CONDOMINIUM, A CONDOMINIUM, according to the Declaration of Condominium thereof, together with an undivided interest in the common elements, filed September 6, 1995, in Official Records Book 16908, at Page 1357, as amended from time to time, of the Public Records of Miami—Dade County, Florida. Which, after the termination of the Condominium becomes effective, shall be described as: Parcel 2: All of Tract "I", less the South 216.66 feet as measured at right angles to the South line of said Tract "I", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami—Dade County, Florida. And The South 200 feet of Tract "H", as measured at right angles to the South line of said Tract "H", of AMENDED PLAT NORTH BISCAYNE BEACH, according to the plat thereof, as recorded in Plat Book 44, at Page 42, of the Public Records of Miami—Dade County, Florida. Also described as: The West X of the Southeast X of the Southwest X of the Northeast X less the North 1h of the West 112 feet and less the East 12 feet of the South 300 feet and less the South 50 feet, in Section 10, Township 53 South Range 41 East, lying and being in Miami—Dade County, Florida. LOCATION SKETCH NTS ENGINEERS: V. S. N. ENG INEERING, I NC. '11- C-2 SITE AND PAVING ENGINEERS Q OVERALL GRADING AND DRAINAGE PLAN C-4 DRAINAGE PLAN CO C-5 DRAINAGE PLAN 27 GRADING PLAN C-7 GRADING PLAN !4 C-8 a DETAILS 191 STREET TRACT' 0' SEDIMENT TANK = o i C -i0 SEDIMENT TANK AND DRAINAGE Q C -ii SEDIMENT TANK !4 9 OF Q' SEDIMENT TANK AND DRAINAGE 15 C-13 V !90th. STREET C-14 SEDIMENT TANK �i cc � WELL NO 6 DETAILS C -i5 SEDIMENT TANK AND DRAINAGE WELL NO 7 DETAILS C-16 SEDIMENT TANK 15 TRACT 'P WELL NO 8 DETAILS 30 CDS HYDRONOMIC SEPARATOR DETAIL 3 SITE UTILITIES A C-19 !6 ^ PLAN 189th. TEAR. PLAN 22 i zz WATER DETAILS Q C-22 Q 0 1 = 3o 15 x Q 21 189th. C-24 !6 Lj LLJ 0 ! STREET ¢ c' o U Z20 " Q 16 4 9 TRACT 'H' O 30 B mo i7 U yo 188th. STREET co !2 24 x #-- T z 187th. !3 Q i STREET 13 41 J 10 14 Q TRACT is ~ Q !! ! 15 186th. STREET ! 4 J 0 1 U 0 TRACT NO 6 i LOCATION SKETCH NTS ENGINEERS: V. S. N. ENG INEERING, I NC. CIVIL C-2 SITE AND PAVING ENGINEERS 8550 W. FLAGLER STREET, SUITE 113 MIAMI, FLORIDA 33144 TEL ( 305 ) 551-6267 FAX C 305 551-4542 LIST OF DRAWINGS: C-0 COVER SHEET AND LOCATION MAP C -i SITE AND PAVING PLAN C-2 SITE AND PAVING DETAILS C-3 OVERALL GRADING AND DRAINAGE PLAN C-4 DRAINAGE PLAN C-5 DRAINAGE PLAN C-6 GRADING PLAN C-7 GRADING PLAN C-8 STORM DRAINAGE DETAILS C-9 SEDIMENT TANK AND DRAINAGE WELL NO i DETAILS C -i0 SEDIMENT TANK AND DRAINAGE WELL NO 2 DETAILS C -ii SEDIMENT TANK AND DRAINAGE WELL NO 3 DETAILS C-12 SEDIMENT TANK AND DRAINAGE WELL NO 4 DETAILS C-13 SEDIMENT TANK AND DRAINAGE WELL NO 5 DETAILS C-14 SEDIMENT TANK AND DRAINAGE WELL NO 6 DETAILS C -i5 SEDIMENT TANK AND DRAINAGE WELL NO 7 DETAILS C-16 SEDIMENT TANK AND DRAINAGE WELL NO 8 DETAILS C-17 CDS HYDRONOMIC SEPARATOR DETAIL C-18 SITE UTILITIES PLAN C-19 SITE UTILITIES PLAN C-20 SITE UTILITIES PLAN C-21 WATER DETAILS C-22 WATER DETAILS C-23 WATER PROFILES C-24 SEWER PROFILES RODOLFO J. VARGAS PE * 35648 CERTIFICATE OF AUTH *5529 dated: July 16, 2015 Cad Ref: 15004-40 C-0 TYPE "All JOINT P. T%p,:3 5' -0" [ TYP. ) ANEW SIDEWALK 4�� ON I N �4 PER FT. I �� SLOPE TYPE 11B" A -J EX I ST. S I DEWALK BACK OF JOINT WALK LINE TYPE " A" JO I NT PLAN gFr:T I nN A- A iia R �d R fT Iia R pPREMOLDED EXPANSION JOINT MATERIAL TYPE "All TYPE "B" TYPE " C" JOINT DETAILS CONCRETE SIDEWALK N. T. S. BROOM FINISH GUT1 EDGE OF PAVEM TANDARD 6" CURB NOSE DOWN TO FINISH GRADE SURFACE AS SPECIFIED TYPICAL ELEVATION STANDARD CURB NOSING N. T. S. EXISTING PAVEMENT AND BASE PROPOSED illMILLING AND 1 RESURFACING SEE SHEET C -i FOR LIMITS OF WORK COLLINS EXISTING BASE AVENUE N. T. S. DESIGN SPEED = 35 MPH MILLING MILL EXISTING ASPHALT PAVEMENT [1' AVG. DEPTH) [3/4' BELOW LIP OF GUTTER AT LOW SIDE) RESURFACING TYPE SP STRUCTURAL COURSE (TRAFFIC LEVEL C) 100 LBS/SY. PER i' LIFT) ASPHALTIC CONCRETE FRICTION COURSE FC -9.5 [iiO LBS/SY RUBBER) 2" R r- PAVERS BASE TYPE " D" CURB N. T. S. PROPOSED SIDEWALK PROP 2' CURB & GUTTER (TYPE " F" ) 6" 1' -6" 2' r7 3� � ^clu (D 3/4' _ B� TYPE " F" CONCRETE CURB & GUTTER 3/4 N. T. S. 8" 2- _011 VALLEY GUTTER— N. T. S. SITE AND PAVING DETAILS Z O O) CU Ln �-+ m c Cc o m a M M 0- z z °C a o LL w CC m O (-U LL O O O O J Z c w F- _ U wa > LI U -� Lf) Q LC) � _ C� J — 0 - LL 0 LL m: LC-)Im O U > c c — cc z a Q Cr -1 1- m rn U N N N Q LV LL C U) M LD TT>'' �IIJ U) I I I CU LO > VJ LO W ,�Lf) E n V 1J J O a) U) m Q v LL ail J O LCI LCI co Q 0 Cc O J LL L Q z= Cf) L U W°° Q L U) Q Z Z Cn L O -J Cf) O U — Z � Q O Z U O CO Z ::D CD U) L- 0 U no date revision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 17, 2015 cad ref 15004-42 RODOLFO J. VARGAS PE * 35648 drawing C — 2 Z O N C ¢ cn LEGEND: ('� o a E V E N D• EXISTING PROPOSED — N L p Z ¢¢O O oLu SPOT ELEVATION NGVD 1�h°�h m m LLa CC�- L NAVD i"y . m O o p v NGVD =155 C W Q , SPOT ELEVATION NAVD m - v W v a o — O — ta' LL U -� p LL LL O — ] Z Q m vrn C C— < Cr — W c • — v „ „ Q cn FW- W @1 D(0N (n cu I , .. CONTROL LINE COASTAL CONSTRUCTION [ CCCL I— i In 'o -) IX I sT FIFE HYDRAL HYDRANT LU IX 1ST POKER POLEI Q /�l —I O � 898'53'43'„ 489.99' PROPERTY LINE .— . t/ rJ (� 0 > Q v z0b O 6 0 a 1 O 1 W y 10 ir 3 1— 10, O Ln 6 ti a 0' 1. 1. 10® 0 00 0Z9 ' � III �0 r�I �6be1 O I 0�,L1 I� II `°• I° I y o 6 III II i i g I 1 6z 01 tiZ i III III I I I® MEAN H I GH III I I ELEVATION E+1. 87 NGVD III I I ® ELEVATION +0.37 NAVD tE Q III III I � ��6 �Op o 0 0_ � II I 161 16 � 0 ti0 � � 0� �a 1' 0. mo oZ ' �6Z I� (I I I60 ao ®� ® 0 aj01� err III + It 1 +bz� e a ��' ab p ' oil 000 0 1 J III II h I i oI o 1 S LL_ 1 0 n LLI .III III I I • III ° Z1a 01' I �/,\:p W 120 1 1 I o z_ 9 III III 1 o'pOZ ao`O , 0 000 0 �ti ? ? . o (n LLJ U III III p �•� I 0.� 0•Z� I 1• 1• � � > aQ 1 �� III�pO° w IN Li — Cf, CD ZZ (n— LLI JJ�--. "sill I Q p .J U) III III W Illnl _ p Com- III II �,. I �. �• X01 Z �1 � � Z � O 0 J 1 0 0 �} O � z 01II III e� a 9s6 I C U O Z U 1. Z0 0. O 1 m CO ::D z o•a0® III N) a " :, o o Cao Cf) III W Q 1 o� O �°j10 ' LL —1 i III III �6Z 1:` ZZ 0. 00 • III° ��� VA1 I 0 0 2 O I III III p 1 O U I � �I ilI � � �•p,2 0� � O ,, �.� �' J � a III a I o Q C..) U. III" ��1 0'1• 0� 1 III I ® no Jdate revision/issue KI III �6 6o I s 96Z 1® I i o eoo , 0Z1 I) ° �0 p00 1b. II� �• 1. � �ti ®0 I oZ � � III � � 0 0 9Z •1 � o' a1 0� J III J I 0 Z SEASONAL HIGH 0 11 WATER LINE i I QI a 1• 6 ELEVATION +5.69 NGVD �i I III �r2 I o "ELEVATION +4.14 NAVD p.01 0 1 �`S 6 0• 2 rO'r0 ti'O 1 019 1602 1'0 0'0 ao O 0 0.60' ' 11 1• ,y0 1• ,Lq, 0 0.OgS 0.6 00 ® I 1 } • N I �, designed R. VARGAS •s 0 .0. drawn N. SERRATE ® 1. 06 F 91 O {� checked L. SERRATE F o� 1` I o� e1 1 approved R. VARGAS 10 Z � p p 0• prod no 15004-01 W 1• J 1• 0' 1. S.L 1. 1• 0, 0 �I� �J a'Z 062° o°j 1 pp 1�0tio o scale ill = 30' o0z I �fI I e�Z� 6 1' date SEPT 19, 2015 p li' II�0�0 A0 0�0 p. 00 N88053'431E474.18' PROPERTY I 2 0' Cad ref 15004-47 LIMITS OF III I VEMATION RODOLFO J. VARGAS PE s 35648 drawing 30' 15' 0' 30' Scale: ill 30' C-3 OVERALL GRADING AND DRAINAGE PLAN Z O O - N H -4 LO c� m ¢ m C '° o <( MATCH L I NE C SEE SHEET C-4 - � z ` a Z a o Z% . "' � LL Lr) Scale: 1° 20' m o I LL O oLU d C a > a Q�e ® I _ w v _ In EHEE LL LO — �o _ o I� o ® I c c~ C-) J C mmc ac - '� CD LU �+ X c - U M M Q N LIMITS OFLU rg PARKI� _ c UNDERGROUND (p cn I� �I� �� .,.. �- — W z O Z I� w�� LIMITS OF %� J O a) UNDERGROUND I CD m Iw PARKING I " a LL Ia. I 3W NJ 0 1>1N LON InIn I, I I� I`c"� .� °' I� I�W IW I a Im Q Im I m Q 1001 N — z r7 o W LL • II I O Z = II W U zoa rzcnc� [®cc II !I L z� zm no oz I ? ZO m 0 -j wrz� OCC-F-a-jo-j 01,-f-ws mmccou)aw_ mw cuz.,>u.v� U)CLCCW ow f OWOW V fn LL fn V O Z LL W C Q Q W ' U i2° HDPE STORM �" '�-- a m ¢oaw -� -___...� II I W _ Cn 0 Dx O .OZ OF -F -W i -az- maws n0 date revision/issue PRQP SEDIMENT TANK AND DRAINAGE WELL NO 8 PROPERTY LINE �_ ` �' ----- -• � NO 1 ° 30' 05' E 232. 79' z Z � cn r F -g s a o to _ _ ...� FOR DETAILS Q W Z OOWUM to CLCCW -' ,,,� -- r SEE SHEET C-16 -- --° -- -- N --° --� - - W - - — W ago= owow w o UWLLM _ _ I FOR CONTINUATION t J Q ." LIMITS OF SEE PLUMBING DWGS p _I U)wi LL PROP SEDIMENT TANK - _ _ UNDERGROUND I " - --_ - LL � ... '�-.�.� ... 22 E 202. 67' PARK I NG — •— -- ._ _" _ - --_ _ .._ _-- -- _ !I L z� zm no oz I ? ZO m 0 -j wrz� OCC-F-a-jo-j 01,-f-ws mmccou)aw_ mw cuz.,>u.v� U)CLCCW ow f OWOW V fn LL fn V O Z LL ' U i2° HDPE STORM �" '�-- t ROOF? INV EL - 2.00 FOR CONTINUATION -� -___...� SEE PLUMBING DWGS n0 date revision/issue PRQP SEDIMENT TANK AND DRAINAGE WELL NO 8 PROPERTY LINE �_ ` �' ----- -• � NO 1 ° 30' 05' E 232. 79' FOR DETAILS SEE SHEET C-16 -- --° -- -- N --° --� - - W - - 12° HDPE STORM [ROOF? INV EL - 2. 00 FOR CONTINUATION SEE PLUMBING DWGS PROP SEDIMENT TANK AND DRAINAGE WELL NO 7 FOR DETAILS SEE SHEET C-15 --° -- --• --r W designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale 1" = 20' date OCT 20, 2015 cad ref 15004-44 ROD01-170 J. VARGAS PE s 35648 drawing 20' 10' 0' 20' Scale: 1" = 20' C - 5 DRA INAGE PLAN POLLUTION RETARDANT CATCH BASIN OR MANHOLE LEVELING COURSE SELECT FILL g■ . 5' X VAR I E 6' oo� oo� ooc� ooc� -A BAFFLE NO SLOTS OR PERFORATIONS m Z .......•.......•....•.•..... .. ... . .. . . . . . . . . . . . . . . . . .. .. .. ... .. .. ........... ............ ..... ........ ........ '... .. ... .... .. ...................0... ...........U. %. ......... ..........Q (L . . . . . . . . . . . . . . . . . . . . . . . . .•••••... ...•• •.•.f ••................... ° MIN.........................................................'.'.................... cte NON -SHRINK GROUT ALL AROUND [TYP]clu En BALLAST ROCK 8■ BOTTOM EL - [ - ] 5. 00 NGVD o°cg, SOLID PLATE TOP OF BAFFI 2'-6" FRENCH DRAIN LENGTH ( SEE PLANS] LONGITUDINAL SECTION N. T. S. BAFFLE DETAIL SEE NOTE 2 DIAMETER Z1_ OF PIPE LTOFRENCH RAI CORRUGATED SKIMMER BAFFLE PER FOOT INDEX NO 241 i BRICK TO GRADE BY CONTRACTOR MAX. TWO COURSES 0 4 BARS @ 6' 0. C. E. 1'1. [MINIMUM) K1.0 NOTE 3 PLATE TO BE WELDED ON TOP OF BAFFLE TO FRENCHIDRAIN BRACKET DETAIL FOR ELEVATION--" SEE PLANS NOTES FOR P. R. CATCH BASIN i) SKIMMER FOR FRENCH DRAIN OUTLETS PER FDOT INDEX NO 241 23 1/2" GALVANIZED LAG BOLT IN LEAD SHIELD ( TYP. ] 31 WELD OR 2-i/2" THRU BOLTS (S. S. ]. 41 GRATING SHALL BE OFFSET IF STRUCTURE IS USED AS OVERFLOW. 51 MINIMUM SIZE OF CATCH BASIN PER SD 2.6 OR LARGER ONE BAFFLE (420X4201, TWO BAFFLES (540X54'1 SQUARE 2'-6" MIN SEE BAFFLE DETAIL U.S. FOUNDRY FRAME 6 GRATE No. 4155 FOR CATCH BASINS FRENCH DRAIN e' 0 .°80 ow a 8" PRECAST CONC. STRUCTURE o 4 BARS @ 12' /_0. C. E. W. [MINI MUM] TO FRENCH DRAIN m It N BAFFLES FOR POLLUTION 0 ° RETARDANT o o • ° BASIN (P. R. B. ) SEE NOTE i o° ',o POLLUTION RETARDANT CATCH BASING DETAIL N. T. S. 0 10-1' X in GALV., STEEL OR ALUM. WIRE MESH. (OVER PIPE END] -PERFORATED 15" HDPE INV EL - 4.00 NGVD [ SEE NOTE 21 WODEN PLASTIC FILTER FABRIC 1' -0 0 is i OR STEEPER WODEN PLASTIC FILTER FABRIC 8' -09 01 SELECT BACKFILL LT�30 ROOFING FELT PEA ROCK i' - 0' N. COV ..... T71 ... .... ..... ....... ......... i•.•.•.•.•.•.•.•.• •moi• z.•.•...•.•.•.•.•.•.•.•.•... 0 BALLAST ROCK �k2 3'-0" FINISHED GRADE SEE GRADING PLANS o Z o Z o z o Z 1•iATER TABLE EL - 2.00 NGVD (OCTOBER HIGH] -PERFORATED 15' HDPE INV EL - 4.00 NGVD ( SEE NOTE 21 PERFORATED i5' HDPE INV EL = 4. 00 NGVD (SEE NOTE 23 FILTER FABRIC - �BOTTOM EL a (-) 5. 00 NGVD FILTER "X" OR APPROVED EQUAL. EXTENDED FILTER FABRIC TO BOTTOM OF TRENCH. FINISHED GRADE SEE GRADING PLANS is i OR STEEPER 0 10- i" X in GALV., STEEL OR ALUM. WIRE MESH. (OVER PIPE END] FILTER FABRIC ALTERNATE CROSS-SECTION DETAIL TRANSVERSE SECTION DETAIL FOR SANDY SOIL CONDITION N. T. S. N. T. S. FRENCH DRAIN DETA I L NOTE: FRENCH DRAIN SHOWN TO BE USED FOR GARAGE AREAS ONLY FRENCH DRAIN WITHOUT 2' SAND BE TO BE USED FOR OTHER CONDITIONS DRAINAGE NOTES: i. These plans have been prepared with the best information available to the Engineer. Contractor must verify all existing underground utilities prior to beginning of construction. If any discrepancies are encountered to the extent that a 'field revi- sion" is required, Engineer must be notified immediately. 2. It Is the responsibility of the Contractor to protect all existing improvements during construction. If any damage occurs as a result of the construction activities, Contractor shall restore such improvements to identical line, grade, esthetical and structural conditions as they were prior to beginning of construction. 3. All elevations refer to National Geodetic Vertical Datum (N. G. V. D. ], 1929. 4. Dade County Flood Criteria for this project Is 5.00 [ N. G. V. D. ] 5. October High Water Elevation i s 2.00 (N. G. V. D. ] . 6. All proposed elevations are to edge of pavement or driveway center I i ne. 7. All French Drain perforated pipe shall be 15' diameter and shall have a minimum Invert elevation of 4.00 ( N. G. V. D. ] . (Unless otherwise noted). 8. French Drain bottom elevation sha I I be (-) 5.00 (N. G. V. D. ] . 9. The following items shall be constructed in accordance with the referenced details from the Dade County Public Works Manual: a. French Drain ....................... S. D. i. i b. Catch Basin ........ ........ S. D. 2. 6 c. Catch Basin Frame and Grate........ S. D. 2. 3 d. 2' Valley Gutter ................... R. 14. 6 e. P-6 Inlet .......................SD 3.4 f. Swale Inlet........................SD 3.1 10. Contractor must observe extreme care to prevent debris, silts and fines from entering French Drain. Inlet Grates shall remain covered with filter fabric during construction until the system is ready to enter in operation. ii. Contractor to verify soil conditions at site. If muck is encountered, contractor shall demuck area and fill to grade with minimum 913% density. 12. All areas not paved must be sodded. 13. All work to be done in accordance with Miami -Dade County Public Works Standard Details and Specifications. 14. All topographic and survey information Is based on Sketches of Survey prepared by Fortin, Leavy, Skyles Land Surveyors. 15. Pipe requirements: French drain pipes shall be ADS Corrugated Polyethylene [Perforated). All other pipes shall be ADS N-12 Polyethylene Non -Perforated. [or approved equal]. 16. Contractor shall provide a Paving and Drainage 'AS -BUILT PLAN' certified by a Professional Registered Land Surveyor in the State of Florida reflecting all the features of the Stormwater System and should include, exlstin pavement and swale area grades, catch basin rim and invert elevations, french drain length and bottom elevation, etc. 17. a. Drainage Trenches to be ZURN Z-882 6' or 12' Perma-Trench as per ZURN FLO-DRAIN COMPANY (813) 754-7i48 or approved equal. b. Trench Drains shall be capable of conveying a minimum flow of 1,709 gpm at the last down stream section. c. Contractor shall submit Shop Drawings and documentation for review and approval prior to ordering and shall strictly follow manufacture's Specifications and Installation Instructions. d. Contractor to install Class E Grates Type Z -882 -HDP, heel proof, capable of supporting H-20 loading. NOTE: i. FRENCH DRAIN TO BE IN ACCORDANCE WITH DADE COUNTY STANDARD DETAILS SD-i.i LATEST REVISION MARCH 12, 1992. 2. WOVEN PLASTIC FILTER FABRIC [AT EACH SIDE, TOP AND BOTTOM] SHALL BE USED IN SANDY OR FILLED AREAS. 3. WASH DOWN THE BALLAST ROCK WITH CLEAN WATER AFTER ROCK HAS BEEN PLACED TO THE PROPER ELEVATION TO ALLOW FOR INITIAL SETTLEMENT THAT MAY OCCUR. ADD ADDITIONAL BALLAST ROCK TO RESTORE ROCK TO THE PROPER ELEVATION IN ACCORDANCE WITH THE DETAILS. 4. FOR PERFORATED CMP PIPE JOINT ARE TO BE BANDED, BUT NOT GASKETED. 5. FOR BAFFLE DETAILS SEE THIS SHEET STORM DRAINAGE DETAILS I I I CS LOCIDcc r-, E J O 0 m LL ailJ 3 w O Z L0 O rn f- d vi cu Ln a ~ m C lid Q m O Q Cn 0 L H Z a w M:t- � O N J LL a u- Ln (D O O 0 I' UJ F- w > a M: lfl a w v QLC) o _ U p - LL - � r -%U Lr) 0) U LL J p LL_ O C H Q CDC cr) C: ID IX w C-) J F- �, x c V N N N Q Cn w LL U) O LOC I I I CS LOCIDcc r-, E J O 0 m LL ailJ 3 w Q cc O LL. L z= L U Q Q L M Cn z cn - L O- U � Z O Z M O M Cf) LL O A no idateirevision/issue designed L. SERRATE drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-48 RODOLFO J. VARGAS PE * 35648 drawing C - 6 O L0 ao Q cc O LL. L z= L U Q Q L M Cn z cn - L O- U � Z O Z M O M Cf) LL O A no idateirevision/issue designed L. SERRATE drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-48 RODOLFO J. VARGAS PE * 35648 drawing C - 6 12" HDPE FROM CDS 1 4" ALL 4" ALL AROUND I m PLAN VIEW N. T. S. LAI' BOLTED WATER TIGHT MANHOLE RING AND COVERS PER USF 655-U-BWT BOLTED TO TOP SLAB USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL = 5.50 (NGVD) SLAB EL = 5.00 (NGVD) /-4 1x 5 BARS @ 12" VERT 30" ° HDPE (ROOF)f��2 EL = 2.00 [ NGVD)# 4 @ 12" C. C. 3E FROM CDS o 1 EACH WAY 2.00 (NGVD) A ` HDPE INTERCONNECT BARS @ 6" HOR I Z--` 12" UF- # 57 STONE CENTER OF MANHOLE OPENINGS I I I I I I I O I o O I I O O I o I O I I° I I -TOLES W/ I I 3/4" ANCHOR BOLTS I I I (EACH RING) 4-1-011 7. -411 411-011 # 7 BARS @ 6" C. C. [BOTTOM) ;> 4 BARS @ 12" C. C. (TOP] TOP SLAB REINFORCING DETAIL N. T. S. .0 U .0 U CV (0-'q I (DJoU t\ O O Q Q Q Q m m 2" CL [TYP) #7 BARS W11/HOOKS o [ STD) @ 6 E. W. CL 01 0 00 0 2--611 LAP. _I 0 .41 #4 @ 12" E. W. 8" 6, -811 PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS PROPOSED PAVERS —F I N EL = 6. 00 NGVD PROPOSED PAVERS 7 BARS @ 6" C. C. E. W. #7 BARS @ 6" C. C. E. W. TOP SLAB EL = 5.00 [ NGVD 1 u u 30" #5 BARS @ 12" VERT o7 BARS @ 6" C. C. EACH WAY o 5 @ 6" E. W. (D t cu pini 00 0 00 0 I o 0 "DIA CLEA 06 E N8 N G 8.. I SECT I ON A- A 15" HDPE INTERCONNECT co INV EL = 2. 00 ( NGVD) I `I L00 0111111- 2411 111111-24" DIAMETER DRAINAGE WELL TOP EL = 2.00 [NGVD ) BOTTOM EL= (-1 2.50 (NGVD) 12" HDPE (ROOF) 12" HDPE FROM CDS #1 INV EL = 2. 00 [ NGVD) / # 7 BAR @ 6" HOR I Z—/ g 12" HDPE ( FROM VENT) INV EL = 2.00 [ NGVD) 12" OF # 57 STONE CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 #5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. # 7 BARS @ 6" ° ° ° ° 3011 ° ° ° 0 ° ° ° ° ° ° # 4 @ 12" C. C. E. W. INTERMEDIATE 2"CL BAFFLE WALL #7 BARS W/HOOKS CD v [ STD ) @6" E. W. ,' 1 / O O 1 / 2 -6" 0 N {�-4 ° 00 o of t °L° 8" 6' - 0" 7' -10" 2"-611 LAP o °o 8" SECTION B -B N. T. S. PLAN A 24' STEEL PIPE + 4 BARS 0 1-1/2' 0. C. E. N. WELDED TO PIPE 4 t7AMb ELDED TO PIPE SEATING STRAP 24' STEEL PIPE 2" X 8" KEYWAY ALL AROUND CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 WATER WELL SCREEN DETAIL N. T. S. AP L TO BE FINISHED 'H OPEN HOLE D I AN 0.375' WALL TH ►CK STEEL CASING NOTES: 1. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPAC I TY OF 2, 000 GPM AT 4. 00 FEET OF HEAD ( M I N I MUM) . I F THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. 8. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDI MENT TANK AND DRAINAGE "IT approved H a d m r-) WELL NO 1 DETAILS Q Z rr N. SERRATE O "IT approved H a d m r-) cc '— m date O a Q 0 C) co 2 �Z� z LU a M _ O CU m 1--U-LO w O 0 cn JZ —w -1 UJ > a -`I In U-1 U a Lo E o J — — r-% O Lo U — o > z — < u- a I= O . m rn v M LLI L i 15" HDPE I NTE 4" ALL LAN PLAN VIEW USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL= 5. 50 [ NGVD) SLAB EL = 5.00 (NGVD) 0 0 �4 I:5 BARS @ 12" VERT ° ° 30" o HDPE (ROOF) 2" .L = 2.00 (NGVD ) C # 4 @ 12" C. C. IDPE INTERCONNECT EACH WAY :L = 2.00 [ NGVD ) A 2" CL [ TYP) #7 BARS W/HOOKS 0 [ STD) @ 6" E. W. ,I Cu 3ARS @ 6" HOR I Z—"- 01 o a 0 00 HDPE I NTERCONNECT 2' -6" LAP. o4 @ 12" E. W. 8" 6.1-811 ie- OF # 57 STONE LE OPENINGS 4.1-011 1 7' -411 7 BARS @ 6" C. C. (BOTTOM) 4 BARS @ 12" C. C. (TOP) 4-1-011 TOP SLAB REINFORCING DETAIL N. T. S. Cu D .i ZQ n Cf) L IY tQ Dm PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS PROPOSED PAVERS /'F I N EL = 6.00 NGVD u u 30" O A A ;k 7 BARS @ 6" C. C. EACH WAY ' ;x 5 @ 6" E. W. co I Cu 4"DIA CLE 06PEN81 ANG I SECTION A -A N. T. S. ROPOSED PAVERS 7 BARS @ 6" C. C. E. W. :07 BARS @ 6" C. C. E. W. 0 TOP SLAB EL = 5.00 [ NGVD) 7 BARS @ 6" 0 0 0 0 30" 0 0 0 -111110 # 5 BARS 0 0 0 0 0 0 a @ 12" VERT # 4 @ 12" C. C. E. W. INTERMEDIATE 211CL BAFFLE WALL #7 BARS W/HOOKS [STD) @ 6" E. W.-7 6 24" DIAMETER DRAINAGE WELL TOP EL = 2.00 [ NGVD ) — _411 I" BOTTOM EL= [ -) 2.50 [ NGVD) 0 12" HDPE (ROOF) 12" HDPE FROM CDS #1-Z INV EL = 2.00 [NGVD ) °°°° #7 BAR @ 6" HOR I Z 15" HDPE INTERCONNECT 8„ INV EL = 2. 00 (NGVD ) 12" OF # 57 STONE CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 -5 ADDITIONAL A REINFORCING BARS [ TYPICAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. 2. -611 0 r° 0O 00 °° 2-6" LAP \° 0 0 "-#4 @ 12" E. W. 811 6' -::o Q H Bit 7' -10" SECTION B -B N. T. S. PLAN 24' STEEL PIPE AE + 4 BARS Q 1-1/2' 0. C. E. W. WELDED TO PIPE SECTION A 4 CAM, =LDED TO PIPE SEATING STRAP 24' STEEL PIPE 2" X 8" KEYWAY ALL AROUND 4 " 0 15" HDPE INTERCONNECT INV EL= 2.00 [ NGVD ) CONTRACTOR TO PROVIDE WATER TIGHT SEAL WELL SCREEN DETAIL N. T. S. CASING TO EXTEND TO G3 WATER TO BE FINISHED OPEN HOLE IAN 0.375, WALL TH STEEL CASING NOTES: 1. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPAC I TY OF 2, 000 GPM AT 4. 00 FEET OF HEAD ( M I N I MUM) . I F THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. 8. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDI MENT TANK AND DRAINAGE WELL O NO 2 0 DETAILS � m c W III Cm> ILD I-- . z m LO to Cr E w 0 I J O O 0m Q v SII J 3 W Z LO O O 'IT 100 0 H � m c W m Z 2 o 0- W U � U) o I— Z Z a — o CT LU m Cc 1--U-Ln J 0- 0 o JZ UJ a 1 M: Ln >-Q W U E — J O Li- — r- O m:Ln v V — 0 u -O . m C c a Q m c Cu �-+ X c QinLLI LL > f-- Q c ZD Lo in III Cm> ILD I-- . z m LO to Cr E w 0 I J O O 0m Q v SII J 3 W Q z z cn —w O LO O In Cf) 100 0 Q z z cn —w Q O J Cf) J 0 O v LL W O Z 2 � W U � a w Q z z cn —w i -- U o Idate Irevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-50 RODOLFO J. VARGAS PE # 35648 drawing C - 10 Q 0 J Cf) 0 O v — Z QO '--1Z U o z CID cn IJO i -- U o Idate Irevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-50 RODOLFO J. VARGAS PE # 35648 drawing C - 10 15" HDPE I NTE 4" ALL Lam PLAN VIEW N. T. S. USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL = 5.50 (NGVD) SLAB EL = 5.00 ( NGVD ) ° ° o5 BARS @ 12" VERT ° ° 30" ° HDPE ( ROOF) rt2ll EL = 2.00 [NGVD) # 4 @ 12" C. C. iDPE INTERCONNECT EACH WAY :L = 2.00 (NGVD ) A ` 1 2" CL [ TYP) #7 BARS W/HOOKS 0 N1STD ) @ 61 E. W. Cu1-4. 3ARS @ 6" HOR I Z__1-'1 �0I O e HDPE I NTERCONNECT° a ° o 2' -6" LAP. #4 @ 12" E. W. 8" 12" UF- b/ 5 1 UNE LE OPENINGS 4' _ p ll 7. -411 Ir 7 BARS @ 6" C. C. (BOTTOM) 4 BARS @ 12" C. C. ( TOP) 4.1-011 TOP SLAB REINFORCING DETAIL N. T. S. Cu 21 n Cn LQ tQ D co ° 30" PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS \PROPOSED PAVERS F IN EL = 6. 00 NGVD �— 7 BARS @ 6" C. C. E. W. #7 BARS @ 6" C. C. E. W. u i u o7 BARS @ 6" C. C. EACH WAY -o5 @ 6" E. W. (D I Cu TOP SLAB EL = 5.00 ( NGVD ) O #5 BARS @ 12" VERT-�, all 00 ON 00 I 00 "DIA CLEA \ 06 ENB�NG 8 I SECTION A -A N. T. S. 24" DIAMETER DRAINAGE WELL TOP EL = 2. 00 ( NGVD ) BOTTOM EL= [ - ) 2.50 ( NGVD ) 12" HDPE (ROOF) 12" HDPE FROM CDS #1 INV EL = 2.00 ( NGVD ) #7 BAR @ 6" HORIZ_/ 15" HDPE INTERCONNECT INV EL = 2.00 [ NGVD ) 12" OF # 57 STONE__"'ZZ CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 #5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL /° °° O Oaf I °0 PROPOSED PAVERS # 7 BARS @ 6" ° °3011 ° ° ° Do m ° ° ° ° ° a # 4 @ 12" C. C. E. W. INTERMEDIATE 211CL BAFFLE WALL #7 BARS W/HOOKS [ STD) @ 6" E. W.-7 2' -611 0 "--# 4 @ 12" E. W. 8„ 6• —011 7' -10" 2' - 6" LAP —Poo— ° o 8" SECTION B -B N. T. S. PLAN A 24• STEEL PIPE • 4 BARS 0 L -i/2' 0. C. E. N. MELDED TO PIPE 4 t$AH1 ELDED TO PIPE SEATING STRAP 24' STEEL PIPE 2" X 8" KEYWAY ALL AROUND all 411 0 15" HDPE INTERCONNECT INV EL = 2. 00 [ NGVD) CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 WATER WELL SCREEN DETAIL N. T. S. TO BE FINISHED OPEN HOLE JAM 0.375, HALL TH STEEL CASING NOTES: 1. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPAC I TY OF 2, 000 GPM AT 4. 00 FEET OF HEAD ( M I N I MUM) . I F THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. B. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDI MENT TANK J AND DRAINAGE J Q m m � WELL NO 3 DETAILS U o I date prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-51 RODOLFO J. VARGAS PE # 35648 drawing Z Q J O "IT J Q m m � m O 0- Q 0 U) 2 I_ ZQ Z o cv w m J LL_� a O o v ,J Z _ I UJ Q M: LO uiU Q In E E J — LL — O LC) U — o > Z LL. Q o m o' — Q U J Q F— v X C N N N Q(n LdLL> Qj (0 in U) N > �I Cn In Ln W r_' E J p O 0 m Q v L.L. 3 Ld I— O LC) Lo Co U o I date prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-51 RODOLFO J. VARGAS PE # 35648 drawing g Q J O J Cly J m 0- v Lj_ W 0 � Z 2 � W U � Q W Q z z cn — w U o I date prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-51 RODOLFO J. VARGAS PE # 35648 drawing g J J 0 J Cly m 0- v Z Q 0 � z U O Z \ CID Cf) 11 O U o I date prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-51 RODOLFO J. VARGAS PE # 35648 drawing 11 15" HDPE I NTE 4" ALL LAN PLAN VIEW N. T. S. USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL = 5.50 (NGVD) SLAB EL = 5.00 [NGVD) 0 0 o5 BARS @ 12" VERT 30" ° HDPE (ROOF) 2" EL = 2.00 (NGVD) # 4 @ 12" C. C. iDPE INTERCONNECT EACH WAY _L = 2.00 (NGVD) A ` 1 2" CL [ TYP) #7 BARS W/HOOKS 0 11 [ STD) @ 6E. W. Ctrl 3ARS @ 6" HOR I Z—*- HDPE INTERCONNECT 2' -6" LAP. #4 @ 12" E. W. 8" 6. -811 1 i�" OF 0 5/ 5 I UNE LE OPENINGS 4' - p ll 7. -411 7 BARS @ 6" C. C. (BOTTOM) $k 4 BARS @ 12" C. C. [ TOP ) 4.1-011 TOP SLAB REINFORCING DETAIL N. T. S. Cu D, -I 21U Cn iQ =a om PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS PROPOSED PAVERS FINN EL = 6.00 NGVD �— 7 BARS @ 6" C. C. E. W. #7 BARS @ 6" C. C. E. W. TOP SLAB EL = 5.00 [NGVD) u u 0 0 30" #5 BARS @ 12llVERT --�, o7 BARS @ 6" C. C. EACH WAY ;x 5 @ 6" E. W. (D I cu 0 OO \ 00 ° 0 "DIA CLEA OPENING 6' - 8" 8" SECTION A -A N. T. S. 24" DIAMETER DRAINAGE WELL TOP EL = 2.00 (NGVD) BOTTOM EL= [-) 2.50 [ NGVD) 12" HDPE (ROOF) 12" HDPE FROM CDS #1 INV EL = 2.00 (NGVD) #7 BAR @ 6" HORIZ 19 15" HDPE INTERCONNECT INV EL = 2.00 (NGVD) 12" OF # 57 STONE—'�z CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 #5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. 0 00 - � 00 ROPOSED PAVERS # 7 BARS @ 6" o °° 30" °° ° so 0 0 0 0 0 0 4 # 4 @ 12" C. C. E. W. INTERMEDIATE 211CL BAFFLE WALL #7 BARS W/HOOKS [ STD) @ 6" E. W.-7 2- - 6" 0 2' -611 LAP t° 00 "- # 4 @ 12" E. W. B 11 6 - p n 8.. 7' -10" SECTION B -B N. T. S. PLAN A 24' STEEL PIPE • 4 BARS 0 1-1/2' 0. C. E. H. MELDED TO PIPE 4 CAMS ELDED TO PIPE SEATING STRAP 24' STEEL PIPE 2" X 8" KEYWAY ALL AROUND 411 0 15" HDPE INTERCONNECT INV EL = 2. 00 [ NGVD ) CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 MATER WELL SCREEN DETAIL N. T. S. Ar .L TO BE FINISHED 'H OPEN HOLE D IAM 0.3759 MALL TH SCK STEEL CASING NOTES: 1. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPAC I TY OF 2, 000 GPM AT 4. 00 FEET OF HEAD [ M I N I MUM) . I F THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. B. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDI MENT TANK AND DRAINAGE "IT approved F-- a 19t m � WELL m date NO 4 DETAILS Q Z: drawn N. SERRATE O "IT approved F-- a 19t m � a m date O � a � CD Z 2 F_ za Z Q o N NW � m F- J w 0 0 u, J z I w a mLO U-1 U Q M E 0 � r-. U Lo - 0 > z LL a O . m rn _Qc�va) U J 1- X C N N N <(n w LL > F- Q1 O N m N > �I M fu 2 E wm I J O N 0m Q v LL J 3 w F- O L0 In CD Q �J drawn N. SERRATE checked O approved (JIl J � o U LL date W cad ref CD Z 2 U) W U � Q W Q z z u, —w Q �J drawn N. SERRATE checked O approved (JIl prod no � o U AS SHOWN date Z cad ref 15004-52 Q 0 �' z U O Z \ LL O U o I date prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-52 RODOLFO J. VARGAS PE # 35648 drawing 15" HDPE I NTE 4" ALL LAN PLAN VIEW N. T. S. USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL = 5.50 [ NGVD) 'SLAB EL = 5.00 [ NGVD ) 0 0 ,5 BARS @ 12" VERT 30" ° .4 HDPE (ROOF) 2 EL = 2.00 [ NGVD ) C# 4 @ 12" C. C. IDPE INTERCONNECT EACH WAY ' :L = 2.00 [ NGVD ] A <*-® t\ 2" CL [ TYP) # 7 BARS W/ HOOKS o 11 [ STD) @ 6E. W. Cu 3ARS @ 6" HOR I Z-"0 00 of 0 e HDPE INTERCONNECT 00 ° 2' -6" LAP. #4 @ 12" E. W. 8" 6' - 8" 1e" Ut- ax n/ 51 UNt LE OPENINGS 4.1-011 7' -411 7 BARS @ 6" C. C. (BOTTOM) ;x 4 BARS @ 12" C. C. (TOP) 4.1-011 TOP SLAB REINFORCING DETAIL N. T. S. (U D -,i 21Q n cn = or =a m .--q PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS PROPOSED PAVERS �F I N EL = 6. 00 NGVD PROPOSED PAVERS 7 BARS @ 6" C. C. E. W. #7 BARS @ 6" C. C. E. W. TOP SLAB EL = 5.00 [ NGVD] u u 0�—j 0 30" #5 BARS A @ 12" VERT ;k 7 BARS @ 6" C. C. EACH WAY ;a 5 @ 6" E. W. co I ru 00 0 N 00 I 00 "DIA CLEA 06 ENB�NG 8.. SECTION A -A N. T. S. 1� 24" DIAMETER DRAINAGE WELL TOP EL = 2.00 [ NGVD) BOTTOM EL= [ - ) 2.50 (NGVD ) 12" HDPE (ROOF) 12" HDPE FROM CDS #1 INV EL = 2. 00 [ NGVD ] #7 BAR @ 6" HORIZ 15" HDPE INTERCONNECT INV EL = 2. 00 (NGVD ) 12" OF # 57 STONE CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 ;1 5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. # 7 BARS @ 6" �--# 4 @ 12" C. C. E. W. �— I NTERMLD I ATE 2" CL BAFFLE WALL #7 BARS W/HOOKS [ STD) @ 6" E. W.-7 2' -611 0 OF 0 00 00 . Oo B„ 6• -\n,, 7' -10" 0 \00 2"-6" LAP to '00 E3" SECTION B -B N. T. S. PLAN A 24' STEEL PIPE • 4 BARS 0 1-1/2' 0. C. E. W. WELDED TO PIPE 4 UAMS =LDED TO PIPE SEATING STRAP 24' STEEL PIPE 0 2" X 8" KEYWAY ALL AROUND all 411 0 15" HDPE INTERCONNECT INV EL = 2. 00 [ NGVD) CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 NATER WELL SCREEN DETAIL N. T. S. Ar L TO BE FINISHED 'H OPEN HOLE D IAN 0. 375' HALL TH 1CK STEEL CASING NOTES: i. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPACITY OF 2,000 GPM AT 4.00 FEET OF HEAD [MINIMUM]. IF THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. B. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDIMENT TANK AND DRAINAGE WELL NO 5 DETAILS I I I CU > �Inro W f1 E J O N 0m a " III3 W Z J LO 0 O Cn 00 0 0- v [n C W cc cn Z 2 O 0- W U � Q W 11- ` I- Z Z a O CV W m:f-- Q J �- LO m CL, O o J Z _' I w a ALO L1J U Q LLQ E_ _ 0 r-% U V O > z LL a O -m o' C C — Q Cl v Q) U _1 F- X c Qin w w > I- cj c LO I I I CU > �Inro W f1 E J O N 0m a " III3 W QgJ O J LO 0 J Cn 00 0 QgJ J 0 J Cn J 0 0- v LL W Z 2 U) W U � Q W Q z zw QgJ J 0 J Cn 0 0- v 7r QO -C-1 z U O Z \ co Cn 11 O U o I date Irevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prof no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-53 RODOLFO J. VARGAS PE # 35648 drawing C- 13 12" HDP FROM CD A 15" HDPE INTERCONNECT I my m = o nn r Klr--vn, 4" ALL PLAN VIEW N. T. S. LE OPENINGS 4' _011 7, _411 7 BARS @ 6" C. C. (BOTTOM) 4 BARS @ 12" C. C. (TOP) 4' -011 TOP SLAB REINFORCING DETAIL N. T. S. CU D 21 oU l Cn CCC LQ ❑I3 USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL = 5.50 (NGVD) 3 EL = 5.00 [NGVD) ° ° RS @ 12" VERT ° ° 30" 2'1 # 4 @ 12" C. C. HDPE (ROOF) EACH WAY V EL = 2.00 [ NGVD ) 2" CL [ TYP) #7 BARS W11/HOOKS o [ STD) @ 6 E. W. CU 6" HOR I Z--" INTERCONNECT 00 . 2' -6" LAP. #4 @ 12" E. W. 8" 6 —811 8 11 57 STONE—// --em- - -I C 15' -411 PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS PROPOSED PAVERS —F I N EL = 6. 00 NGVD �— 7 BARS @ 6" C. C. E. W. 07 BARS @ 6" C. C. E. W. u 30" ° L _ n o7 BARS @ 6" C. C. EACH WAY o5 @ 6" E. W. �1xkm ai�io�iR 00 0 00 00 e I 00 4"D IA CLEA \ OPENING 6' —811 all I SECTION A -A N. T. S. TOP SLAB EL = 5.00 [ NGVD ) 0 #5 BARS @ 12" VERT •• a .l 24" DIAMETER DRAINAGE WELL TOP EL = 2. 00 [ NGVD) BOTTOM EL= [ -) 2. 50 [ NGVD) 12" HDPE [ ROOF) 12" HDPE FROM CDS #1 INV EL = 2. 00 [ NGVD) / 07 BAR @ 6" HORIZ 15" HDPE INTERCONNECT INV EL = 2.00 (NGVD) 12" OF # 57 STONE CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 #5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. ,0 00 00 00 ROPOSED PAVERS 30" 7 BARS @ 6" r—# 4 @ 12" C. C. E. W. INTERMEDIATE 211CL BAFFLE WALL #7 BARS W/HOOKS [ STD) @ 6" E. W.-7 2' - 6" 0 2"-6" LAP S �° 0 #4 @ 12" E. W. 8ll 6' —011 811 ONION 7' -10" SECTION B -B N. T. S. PLAN A 24' STEEL PIPE • 4 BARS 0 1-1/2' 0. C. E. W. WELDED TO PIPE 4 t3AM5 =LDED TO PIPE SEATING STRAP 24' STEEL PIPE 2" X 8" KEYWAY ALL AROUND 411 " 0 9-4 15" HDPE INTERCONNECT INV EL = 2. 00 [ NGVD ) CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 WATER WELL SCREEN DETAIL N. T. S. AI' L TO BE FINISHED H OPEN HOLE D IAN 0.3750 WALL TH 1CK STEEL CASING NOTES: 1. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPAC I TY OF 2, 000 GPM AT 4. 00 FEET OF HEAD [ M I N I MUM) . I F THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. B. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDI / TANK (O DRAINAGE WELL CV DETAILS c �1xkm ai�io�iR 00 0 00 00 e I 00 4"D IA CLEA \ OPENING 6' —811 all I SECTION A -A N. T. S. TOP SLAB EL = 5.00 [ NGVD ) 0 #5 BARS @ 12" VERT •• a .l 24" DIAMETER DRAINAGE WELL TOP EL = 2. 00 [ NGVD) BOTTOM EL= [ -) 2. 50 [ NGVD) 12" HDPE [ ROOF) 12" HDPE FROM CDS #1 INV EL = 2. 00 [ NGVD) / 07 BAR @ 6" HORIZ 15" HDPE INTERCONNECT INV EL = 2.00 (NGVD) 12" OF # 57 STONE CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 #5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. ,0 00 00 00 ROPOSED PAVERS 30" 7 BARS @ 6" r—# 4 @ 12" C. C. E. W. INTERMEDIATE 211CL BAFFLE WALL #7 BARS W/HOOKS [ STD) @ 6" E. W.-7 2' - 6" 0 2"-6" LAP S �° 0 #4 @ 12" E. W. 8ll 6' —011 811 ONION 7' -10" SECTION B -B N. T. S. PLAN A 24' STEEL PIPE • 4 BARS 0 1-1/2' 0. C. E. W. WELDED TO PIPE 4 t3AM5 =LDED TO PIPE SEATING STRAP 24' STEEL PIPE 2" X 8" KEYWAY ALL AROUND 411 " 0 9-4 15" HDPE INTERCONNECT INV EL = 2. 00 [ NGVD ) CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 WATER WELL SCREEN DETAIL N. T. S. AI' L TO BE FINISHED H OPEN HOLE D IAN 0.3750 WALL TH 1CK STEEL CASING NOTES: 1. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPAC I TY OF 2, 000 GPM AT 4. 00 FEET OF HEAD [ M I N I MUM) . I F THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. B. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDI MENT TANK AND DRAINAGE WELL NO 6 DETAILS z O R. c � O Q _ 0- Cn z z Q W Q J N ~ CL w LO m O o JZ -1 c _ W< > W U ---'-q Lo E Q V J 0 Q 0 LL _Q r-. Ln p U . c c > — z Q Cc m �• rn — U N J F-- N N X Qin C w LL > O CSDEn c z m Lo CC �fu E U-1 0 J p c� I Q) m Q " U - �IILd J 3 1'- 0 Ln LCA co a 0 IZ O Li - LU L CD Z w = Cn LTJ U m > Q D Q L! Cn Z Z Cn — Ll � J J O —j Cn O U - Z � QO ---1 z U O Z CID =) CID CI) LL O U no date revision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prof no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-54 RODOLFO J. VARGAS PE # 35648 drawing 12" HDPE 4" ALL 4" ALL AROUND PLAN VIEW N. T. S. RAN USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL = 5.50 (NGVD) ACCESS MANHOLE USF#663AA BOLTED WATER TIGHT LETTERING TO SAY "WELL" (TO ALIGN WITH WELL CASING)—\ FIN EL = 6.00 NGVD TOP SLAB EL = 5.00 (NGVD) co ° ° 30" o5 BARS @ 12" VERT ° ° 2" # 4 @ 12" C. C. 12" HDPE (ROOF) EACH WAY 0 _ _ I Lo BOLTED WATER TIGHT MANHOLE RING AND COVERS PER USF 655-U-BWT BOLTED TO TOP SLAB NV EL = 2.00 [ NGVDI A #7 BARS @ 6" HORIZ 12" OF # 57 STONE rCENTER OF MANHOLE OPENINGS I INLET FRAME AND GRA E I USF 04700-6223 I I I I II V 1 ° I o I I C oo , O ( O O O I o O I o 0 o I I o o ° I I Io I I I I I I I I I I I I 4._011 7'_411 4'-011 # 7 BARS @ 6" C. C. (BOTTOM) 4 BARS @ 12" C. C. (TOP) TOP SLAB REINFORCING DETAIL N. T. S. CU I @1 Qj t\ U) Cf) Cr C= as mm PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS PROPOSED PAVERS /—F I N EL = 6. 00 NGVD 30" *k 7 BARS @ 6" C. C. EACH WAY # 5 @ 6" E. W. co / I � cu 2" CL [TYP) #7 BARS W/HOOKS CD I [ STD) @ 6" E. W. ,,I I / O° ° 0 ° ° ° 2' -6" LAP.J, . #4 @ 12" E. W. 8" 6' - 8" 8" 15' -4 4"DIA CLE 06PEN81 ANG I SECTION A—A N. T. S. 7 BARS @ 6" C. C. E. W. #7 BARS @ 6" C. C. E. W. TOP SLAB EL = 5.00 [NGVD] p #5 BARS @ 12" VERT—, 24" DIAMETER DRAINAGE WELL TOP EL = 2. 00 [NGVD) 111 --� �-4 BOTTOM EL= C-) 2.50 [NGVD) 0 12" HDPE (ROOF) 00 0 INV EL = 2. 00 ( NGVD) °°° ° ° #7 BAR @ 6" HOR I Z-- 12" OF # 57 STONE CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 #5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. ° ° ° 00 °° ROPOSED PAVERS # 7 BARS @ 6" �# 4 @ 12" C. C. E. W. INTERMEDIATE 2"CL BAFFLE WALL #7 BARS W/HOOKS Go - [ STD) @ 6" E. W.i I co ao 2" -6" LAP fo, 1 °o # 4 @ 12" E. W. ` 8" 6' - 0" 8►' 1111 7' -10" SECTION B—B N. T. S. PLAN A 24' STEEL PIPE • 4 BARS Q 1-1/2' 0. C. E. N. WELDED TO PIPE 4 tlAMb =LDED TO PIPE SEATING STRAP 24' STEEL PIPE 4" 0 2" X 8" KEYWAY ALL AROUND CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 NATER WELL SCREEN DETAIL TO BE FINISHED OPEN HOLE IAM 0.375, MALL TH STEEL CASING N. T. S. NOTES: 1. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPACITY OF 2,000 GPM AT 4.00 FEET OF HEAD [MINIMUM]. IF THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. 8. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENG INEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDIMENT TANK AND DRAINAGE WELL NO 7 DETAILS Q R. VARGAS drawn N. SERRATE checked 0 o to J 15004-01 v l.— c W cad ref 15004-55 - 2 O °- Q 0 U :D W - Cn w m ` 1- z z a Fm o CU —w W m Cr F- -j �- In m CL O 0 L� C W a mi W U Q LC) E _ C] m:Lii U - > z u- Q O m v' C c - Q CC cri `f C: X C <Cn W W > Qj M U) MN> z LO In ru CC r- E W W 0 I J p N 0m Q v u- SII W L0 co Q R. VARGAS drawn N. SERRATE checked 0 J to J 15004-01 v l.— date W cad ref 15004-55 Z 2 Cn W U :D W - a w m Q z z cn —w Q R. VARGAS drawn N. SERRATE checked p J to prof no 15004-01 v AS SHOWN date Z cad ref 15004-55 Q 0 r-+ z U O Z \ L� O F— U o l date prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prof no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-55 RODOLFO J. VARGAS PE # 35648 drawing C- 15 4" ALL 12" HDPE USF BOLTED WATERTIGHT RIM AND COVER 655-U-BWT RIM EL = 5.50 (NGVD) ACCESS MANHOLE USF#663AA BOLTED WATER TIGHT LETTERING TO SAY "WELL" (TO ALIGN WITH WELL CASING) ­\ FIN EL = 6.00 NGVD TOP SLAB EL = 5.00 (NGVD) 0 O 0 0 0 30" #5 BARS @ 12" VERT 2" 12 12" HDPE ( ROOF) EACH@WAY C. C. 4" ALL AROUND t\ m PLAN VIEW N. T. S. BOLTED WATER TIGHT MANHOLE RING AND COVERS PER USF 655-U-BWT BOLTED TO TOP SLAB NV EL = 2.00 (NGVD) A #7 BARS @ 6" HORIZ 12" OF ;> 57 STONE r --CENTER OF MANHOLE OPENINGS I INLET FRAME AND GRATE I I USF 04700-6223 I I I i I I ° I O I O I I O O O O O I o O I o O o I Io 0F`,�-I I to I I I I I I I I I I I I I I 4, -01111 _ 4„ I 4, -0 „ 7 BARS @ 6" C. C. (BOTTOM) 4 BARS @ 12" C. C. ( TOP) TOP SLAB REINFORCING DETAIL N. T. S. 0 r, I— a I— O 0 I— m " .0 U .0 U 2" CL ( TYP) #7 BARS W�/HOOKS o STD) @ 6 E. W. ( E.W. Cu OF 0 2' -6" LAP. 104 @ 12" E. W. 811 6, _8l' PAVER CONTRACTOR TO PROVIDE A REMOVABLE BRICK PAN OVER ALL MANHOLE COVERS PROPOSED PAVERS /—F I N EL = 6. 00 NGVD o 130" _I � o7 BARS @ 6" C. C. EACH WAY ;> 5 @ 6" E. W. Cu 4"DIA CLE 06PEN8I ANG I SECTION A -A JL 7 BARS @ 6" C. C. E. W. #7 BARS @ 6" C. C. E. W. TOP SLAB EL = 5.00 C NGVni I0 •• all k1_411 0 J-0 00 0 00 I 000 #5 BARS @ 12" VERT 24" DIAMETER DRAINAGE WELL TOP EL = 2.00 (NGVD) BOTTOM EL= (-) 2.50 (NGVD] #7 BAR @ 6" HORIZ 12" OF # 57 STONE CONTRACTOR TO PROVIDE WATER TIGHT SEAL 2 #5 ADDITIONAL A REINFORCING BARS [ TYP I CAL) TYPICAL OPENING REINFORCING DETAIL N. T. S. PROPOSED PAVERS m # 4 @ 12" C. C. E. W. �—INTERMEDIATE 211CL BAFFLE WALL #7 BARS W/HOOKS ( STD) @ 6" E. W.-7 ,o Oo 00 Oo #4 @ 12" E. W. 8" 6,1_011 7' -10" # 7 BARS @ 6" 2' —6" LAP Loo °o 8" SECTION B -B N. T. S. PLAN A 24' STEEL PIPE • 4 BARS G L-1/2' 0. C. E. N. WELDED TO PIPE 4 CARS ELDED TO PIPE SEATING STRAP 24' STEEL PIPE 0 all 411 0 2" X 8" KEYWAY ALL AROUND 12" HDPE (ROOF] INV EL = 2. 00 [ NGVD ) CONTRACTOR TO PROVIDE WATER TIGHT SEAL SECTION A CASING TO EXTEND TO G3 NATER WELL SCREEN DETAIL TO BE FINISHED OPEN HOLE IAM 0.375' WALL TH STEEL CASING N. T. S. NOTES: I. CLASS I CONCRETE TO HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI. NO CLORIDES ARE PERMITTED IN CONCRETE. 2. STEEL TO BE NEW BARS IN ACCORDANCE WITH ASTM A-615, GRADE 60. 3. NO INFLUENT PIPES SHALL BE CONNECTED TO WELL CHAMBER. 4. PROVIDE SHOP DRAWINGS OF SEDIMENT TANK FOR APPROVAL BEFORE FABRICATION. THIS SHALL INCLUDE MANHOLE FRAME AND COVER. 5. PRECAST OPTION IS ACCEPTABLE. CONTRACTOR MUST SUBMIT SHOP DRAWINGS SIGNED AND SEALED BY A STRUCTURAL ENGINEER TO PROJECT MANAGER FOR APPROVAL BY ENGINEER. 6. SEDIMENT TANK SHALL BE DESIGNED TO WITHSTAND H-20 LOADING. 7. CONTRACTOR SHALL PROVIDE DOCUMENTATION FROM THE WELL DRILLER INSURING THAT THE DISPOSAL WELL ATTAINED A MINIMUM DISCHARGE CAPAC I TY OF 2, 000 GPM AT 4. 00 FEET OF HEAD [ M I N I MUM). I F THESE WELL DISCHARGE CAPACITIES ARE NOT OTBAINED, THE ENGINEER MUST BE NOTIFIED IMMEDIATELY. B. CONTRACTOR SHALL MAINTAIN SEDIMENT TANK CLEAN OF ANY DEBRIS FOR THE LENGHT OF THE PROJECT. ENGINEER SHALL BE NOTIFIED FOR FINAL INSPECTION OF THE SEDIMENT TANK AND DRAINAGE WELL PRIOR TO ACCEPTANCE. 9. PROPOSED DRAINAGE WELLS ARE NOT INTENDED TO BE USED FOR DEWATERING OPERATIONS DURING CONSTRUCTION. SEDI MENT TANK AND DRAINAGE O 11q cm WELL Q NO 8 DETAILS o Idate prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prof no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-56 RODOLFO J. VARGAS PE # 35648 drawing z Q O 11q cm Q � a v m c O � ac m _ O a a o W C) cn 2 Cn W I— z z a — cc 0 (1! o W m Q W m Q I- _j v LL Lo m —w EL 0 0 Jz -, - I c 0 0— v w a Z 0 _ Z \ W U Q In E co C:1 — — r-. O lid U tm 0u_ — 0 LL O . O U _l I— CD m H X C N N N QU) L1J LL > F— 0 (D in zm m fu E WLo _j 0 , J O N 0m Q v LL III_j3 � 0 L0 L0 O o Idate prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prof no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-56 RODOLFO J. VARGAS PE # 35648 drawing Q D Q O J W C) Z 2 Cn W U W Z:) — Q W m Q z z U) —w Q o -, cn 0 0— v Q Z 0 �' Z \ U O m Z =) co Cn L� O } H U o Idate prevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prof no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-56 RODOLFO J. VARGAS PE # 35648 drawing n FIBERGLASS "'nVI' "' SEPARATI ('"�" TOP SLAB AC ( SEE FRAME COVER DE HDPE HYC SHEA S STRUCTURE, SCREEN NING 0 FIBERGLASS SEPARATION CYLINDER AND INLET INLET PIPE (MULTIPLE INLET PIPES MAY BE ACCOMMODATED) OIL BAFFLE SKIRT SEPARATION SCREEN HDPE HYDRAULIC SHEAR PLATE WNYAP PLAN VIEW N. T. S. TOP SLAB ACCESS (MAXIMUM] STRUCTURE CONTRACTOR TO GROUT TO FINISHED GRADE GRADE RINGS/RISERS I" SOLIDS STORAGE SUMP// y i 601 OUTSIDE DIAMETER el (MAXIMUM] SECTION A—A N. T. S. FRAME AND COVER (DIAMETER VARIES) N. T. S. OUTLET PERM? POOL VARIES (4'-8") MINIMUM CDS HYDRODYNAMIC SEPARATOR DETAIL Z ry- J O 0 e: F- v d Q� m d e _ e� �rr) e O a e W >- U < ° • a, a M O cu . Cn z J -,q LL Lid O a �* �. Cf) Ld Q - W U Q Liz E d — Ll..11) —,-,%0 U _ p > z — a L. a CC • e ; L— c N N N •e Q • a (j a' . «'N> ( 4' a. e e a a W . J p a) 0m d e a 'e • a 2' a 3 Ld f -- d L0 Lid e d a. e e G d' e e d• a 1 n 9 a e A • [2'J e d d 'v .a •4 . e a.* n e. d• e . e'• C e . a d e: A d e d a a %d e A a• G AlIf d ,d' , ed dG I" SOLIDS STORAGE SUMP// y i 601 OUTSIDE DIAMETER el (MAXIMUM] SECTION A—A N. T. S. FRAME AND COVER (DIAMETER VARIES) N. T. S. OUTLET PERM? POOL VARIES (4'-8") MINIMUM CDS HYDRODYNAMIC SEPARATOR DETAIL pi Z ry- J O 0 J F- v Q� m �rr) O a Cn m: W >- U < F - z LLJ a M O cu m a Cn z J -,q LL Lid O a �* CO Cf) Ld Q - W U Q Liz E 0 J — Ll..11) —,-,%0 U _ p > z — a L. a CC O m o' U J L— c N N N Q cn Ld LL > (j C D U) «'N> LL') CC r-. E W J p a) 0m LL 3 Ld f -- O L0 Lid O pi Qg ry- J 0 J Cn J v LLLi Z Zz 0 Cn m: W >- U < � Q W Q z Cn z cr, —w Qg J J 0 J Cn v Z Q 0 '--j Z U O Z CO Cf) LL O U no (date Irevision/issue designed R. VARGAS drawn N. SERRATE checked L. SERRATE approved R. VARGAS prod no 15004-01 scale AS SHOWN date JULY 16, 2015 cad ref 15004-57 RODOLFO J. VARGAS PE * 35648 drawing C- 17 z 0 O — N ~ �' Q C 1.0 ¢ m o a N p i- a z <o • g CC -� CU CL LL LL) m 0 O Z LU w Q — C l-_ > g LD _ Q w U Q Lo E U p 0 as v V- J p U_ O . > z a m C c c — a cc �. w U J F- c Q(n ww> c U) CU > L_cnLo Scale: i■ _ 5 h �^ w m l `V�lJ JON 0 m " " PROP 8 DIP WM a EXIST R/W LINE w IJ ( I I 3 LU PROPOSED 4" METER & BPD ON PROP 8�� DIP WM 0 CONCRETE PAD (FOR COOLING TOWER m & POOL MAKE UP) PER FIG 341 V DOUBLE DETECTOR CHECK 00 VALVE ASSEMBLY WITH YARD TYPE POST INDICATOR VALVE PROPOSED 3" METER & BPD ON WITH TAMPER SWITCH AND CONCRETE PAD ( FOR IRRIGATION] YARD TYPE FIRE DEPARTMENT PER FIG 341 CONNECTION ( PER FIG 3401 PROP 8"bIP WM PROPOSED 2" METER & BPD ON PROP 8" X4" TEE PROP 6"X450 BEND CONCRETE PAD ( FOR RESTAURANT) AND 4" GV PER FIG 364 PER FIG 341 IO O PER FIG 364 Q _ PROP 8II X6" TEE 29 Xi4 CITY OF 2-6 GATE VALVES AND 6" GV I NORTH MIAMI BEACH PER FIG 305 PER FIG 364 cc PROP 2-2" CORP STOP UTILITY EASEMENT XIST R/W LINE 35'Xi4' CITY OF I PER FIG O PROP B"X4" TEE NORTH MIAMI BEACH PROP 8"DIP WM _ AND 4" GV J — — PER FIG 364 UTILITY EASEMENT L.L. PROP 2-611 -6ABOVE GROUND W " METER AND BACKFLOW PER FIG 364 I m PROP 2-2" CORP STOP PER FIG O W U Z S WITH 6" U)BY-PASS a ( In U)I xw o aw o W I Im CC PROP 6"X900 BE z � o z ( PER FIG 364 I Z U) ICc o PROPOSED 4" METER & BPD ON I PROP 8" D 1 P WM Q _ _ W CONCRETE PAD (FOR COOLING TOWER — — — — — — — — — — & POOL MAKE UP) PER FIG 341 2-8• DOUBLE DETECTOR CHECK 0 VALVE ASSEMBLY WITH YARD 1 I ( Q 0 TYPE POST INDICATOR VALVE " PROP 2-6" ABOVE GROUND m WITH TAMPER SWITCH AND ( I PROPOSED 3 METER & BPD ON METER AND BACKFLOW I I `� z YARD TYPE FIRE DEPARTMENT CONCRETE PAD( FOR IRRIGATION) U CONNECTION ( PER FIG 3403 O PER FIG 341 WITH I THF6G B6 -PASS ( O Q O ', 7 - CD Go Z I I PROPOSED 2" METER & BPD ON I I j Go � CONCRETE PAD [FOR RESTAURANT) OD Cf) I PER FIG 341 I 4 I I PROP 2-6" REDUCED PRESSURE I V- i. PR 5' 3' 1. 5' PERKF I GBACFLOW364EVENTER I I U N1,44I I I � z I I ~ 0) I U _ I PROP 4"W SERVICE ( COOLING TOW R I 2 6 GATE VALVES Z lO I PER FIG 305 I I & POOL) FOR CONTINUATION O ( I I SEE PLUMBING DWGS PROP 3"W SERVICE (LANDSCAPE no date revision/issue — IRRIGATION) FOR CONTINUATION SEE PLUMBING DWGS PROP 8.. PLUGO I I RESTAURANT LIMITS OF I PROP 2 W SERVICE (RESTAURANT) UNDERGROUND I I I FOR CONTINUATION — — - — — - — — — — — — — — — — — — — — — — BASEMENT I I SEE PLUMBING DWGS — — — — ---— — — — — — — --- — — — — I I ( PROP 8"X6" TEE ND 6" GV PROP 4"W SERVICE ( COOLING TOWER ER FIG 364 I A & POOL) FOR CONTINUATION PROP 6X900 BEND I I P " PROP B" DIP FIRE LINE SEE PLUMBING DWGS PER FIG 364 FOR CONTINUATION SEE FIRE PROTECTIONS DWGS PROP 3" W SERVICE ( LANDSCAPE PROP 6"X6" TEE IRRIGATION) FOR CONTINUATION SEE PLUMBING DWGS — — — — — — — — — — — — — — — — PROP 8" PLUG PER FIG 364 PROP 2" W SERVICE (RESTAURANT) FOR CONTINUATION "-- 8' DOUBLE DETECTOR CHECK LIMITS OF SEE PLUMBING DWGS VALVE ASSEMBLY WITH YARD TYPE POST INDICATOR VALVE UNDERGROUND PROP 6"X611 TEE WITH TAMPER SWITCH AND BASEMENT PER FIG 364 YARD TYPE FIRE DEPARTMENT PROP 2-6" REDUCED PRESSURE CONNECTION ON t PER FIG 340 BACKFLOW PREVENTER PER FIG 364 PROP 6" DIP DOM WM designed R. VARGAS FOR CONTINUATION drawn N. SERRATE �� SEE PLUMBING DWGS OR 8' DIP FIRE LINE 2-6 GATE VALVES FOR CONTINUATION checked L. SERRATE SEE FIRE PROTECTIONS DWGS PER FIG 305 45'Xi0' CITY OF ROP R. VARGAS DIP DOM WM NORTH MIAMI BEACH iI II PROP 6 prod no 15004-01 FOR CONTINUATION UTILITY EASEMENT DETA I L B scale i" = 5' SEE PLUMBING DWGS date OCT 20. 2015 SCALE: i., _ 5- DETA I L A ii II cad ref 15004-58 SCALE: i" = 5' NOTE: ALL DIP TO BE POLYETHELENE ENCASED RODOLFO J. VARGAS PE a 35648 - NOTE: ALL DIP TO BE drawing POLYETHELENE ENCASED C-20 SITE UTILITIES PLAN 1 DEMOLITION/CONSTRUCTION STAGING AND TRAFFIC MANAGEMENT PLANS PROJECT NAME: VARADERO PROJECT ADDRESS/LOCATION: 18801 Collins Avenue, Sunny Isles Beach, FL SUBMITTAL DATE: November 2, 2015 PROJECT APPROVAL BY (CITY): ___________________________________ DATE: __________________________________________________________ Note: All Staging and Traffic Management Plan must be approved by Zoning, Building and the City Manager. Modifications may be permitted, if approved by the City Manager or his designee. 2 I. PROJECT (Briefly describe your project) La Playa Beach Associates, LLC is proposing on 18801 Collins Ave, a Two Tower, mixed used program consisting of Multifamily Dwelling, Apartment-Hotel, Hotel, and Amenities within a Zoning Classification of MU-R in the city of Sunny isles. Tower 1 consists of 294 Multifamily Dwelling units, 90 apartment-hotel units, and 60 hotel units. Tower 2 consist of 137 Multifamily Dwelling units. The total Build-able area will be 1,228,399 sqft on a 205,424 sq ft or 4.716 acres lot. The towers will top out at 649'-0" NGVD as required by the FAA height Restrictions. The proposed project will provide Public Beach Access, Public Ocean Front Park, Restaurants, Assembly Area, and 1,022 parking spaces, among other amenities. Provide Contact Information: Please include name, title, company, address, phone number, email, cell phone number. Development Team: Mr. Ron Choron Vice President of Construction La Playa Beach Associates, LLC 17070 Collins Avenue, Suite 267 Sunny Isles Beach, FL 33160 (786) 405-1056 office (786) 402-3610 cell rlchoron@fortuneintlgroup.com Construction Team: Mr. Ron Choron Vice President of Construction La Playa Beach Associates, LLC 17070 Collins Avenue, Suite 267 Sunny Isles Beach, FL 33160 (786) 405-1056 office (786) 402-3610 cell rlchoron@fortuneintlgroup.com Other: 3 Not applicable 4 II. Demolition Work/Excavation and Grading/Concrete Placement Work For purposes of this document, Demolition work was completed in June 2015, therefore, Demolition phase work is not included in this plan. Contractor Information: Please include name, company, address, phone number, email, cell phone number. To be determined Project Location: 18801 Collins Avenue, Sunny Isles Beach, FL 33160 Estimated Start Date: January 2017 Estimated Completion Date: December 2019 Hours of Operation: 1. On the majority of days, the contractor will comply with the Sunny Isles Beach Code of Ordinances, Chapter 193, Article III regarding Construction Noise, which limits the days and hours of work as follows: a. Standard time: 7:00 a.m. to 6:30 p.m. Monday through Thursday, 7:00 a.m. to 5:00 p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday b. Daylight savings time: 7:00 a.m. to 7:00 p.m. Monday through Thursday, 7:00 a.m. to 5:00 p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday c. No construction activities shall take place on Sunday and on the following holidays: New Year's Day; Fourth of July; Labor Day; Yom Kippur; Thanksgiving Day; and, Christmas Day 2. As building construction can require some off-hour work, all night work, and unforeseeable circumstances beyond the control of the contractor, the contractor will comply with the City’s process for the Request for Waiver of Chapter 193 of the Code of the City of Sunny Isles Beach and notify all adjacent properties and submit applications for extended construction hours (see form, below). Some activities that will require extended construction hours include: a. Utility upgrades and tie-ins under Collins Avenue and adjacent sidewalk b. Heavy and/or large equipment and material delivery and removal c. Foundation dewatering d. 24-hour mat foundation concrete pour e. Activities where the safety of the public would be better served during off- hours work f. Emergencies and other unforeseeable events 5 6 Project Task: Describe project; include equipment to be used. Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional insured. All equipment will be modified to include OSHA-compliant “white-noise” back-up alarms to reduce construction site noise. 1. Utility upgrades and tie-ins under Collins Avenue, including: a. Electrical service b. Domestic water c. Fire water d. Sanitary e. Storm water f. Natural gas g. Telephone/data/cable tv All of which may require the following equipment: a. Backhoes/Excavators b. Loaders c. Trucks (dump trucks, concrete trucks, equipment trucks, etc.) d. Trailers e. Compaction equipment f. Sawcutting equipment g. Paving machines h. Directional boring equipment i. Pumps (both for dewatering and concrete) j. Street sweepers k. Generators 2. Site preparation, grading, and excavation: a. Backhoes/Excavators b. Loaders c. Bulldozers d. Motor graders e. Trucks (dump trucks, equipment trucks, etc.) f. Dewatering pumps g. Sand sifting equipment for beach sand relocation h. Water trucks i. Street sweepers j. Generators 3. Augered Cast-in-Place Pile installation: a. Cranes (crawler and hydraulic) b. Drill rigs c. Concrete trucks (for grout) d. Grout pumps e. Loaders 7 f. Trucks/Trailers (for reinforcing steel deliveries) g. Generators 4. Temporary shoring and excavation: a. Cranes (crawler and hydraulic) b. Drill rigs c. Pile-driving equipment d. Concrete trucks e. Trucks/Trailers f. Backhoes/Excavators g. Loaders/Dozers h. Dump Trucks i. Compaction equipment j. Dewatering pumps (diesel and electric) k. Generators 5. Mat foundation preparation and concrete pour: a. Cranes (tower, crawler, and hydraulic) b. Backhoes/Loaders c. Pumps (both for dewatering and concrete) d. Trucks (dump trucks, concrete trucks, equipment trucks, etc.) e. Trailers f. Concrete finishing equipment 6. Tower Crane and Man/Material Hoist Erection, Jumps, and Dismantling: a. Large crawler and hydraulic cranes (for tower crane and man/material hoist assembly and erection) b. Tower cranes (for tower crane and man/material hoist jumping) c. Large crawler and hydraulic cranes (for tower crane and man/material hoist dismantling) d. Generators e. Tractor trailers 7. Other concrete placement activities: a. Cranes (tower, crawler, and hydraulic) b. Concrete pumps c. Concrete trucks d. Truck/trailers e. Generators Additional Information (as applicable to project) Truck Route: Describe truck routes (attach route map), include number of trucks and staging location. 8 The number of trucks will vary greatly over the course of the project. During concrete operations, we expect a minimum of fifty (50) deliveries in the course of a typical day. The proposed truck route for the project will be as shown on the attached Traffic Pattern to Enter/Exit Jobsite. Most trucks, except for the foundation mat concrete trucks, will be staged on-site and not on Collins Avenue. The contractor will design project trucks routes within the property to allow for truck staging within the site. In addition, the contractor will have trained and certified flagmen (“gate attendants”) at each gate that will ensure no trucks stage on Collins Avenue and will allow trucks to exit the site with minimizing disruption to traffic. As at Jade Signature, our contractor will hold training sessions with all subcontractors and vendors to review the truck route and rules and regulations regarding truck deliveries. For example, at Jade Signature, the contractor has inserted language into all subcontracts and purchase orders requiring them to: 1. Fully comply with plans like this one, at all times 2. No delivery vehicles are allowed to make “u-turns” on Collins Avenue 3. No delivery vehicles are allowed to utilize side streets or commercial parking lots to make “turn-arounds” 4. No delivery vehicles are allowed to block Collins Avenue for any reason Material Storage Location: Describe the location for material storage (if needed). Any removal or relocation of sand, must be approved separately. It is our intention that some materials will be stored on-site, space permitting. Locations will vary throughout the course of the activities; however, the materials will remain inside the fenced construction site. Specifically for sand, we would ideally like to stock the sand on-site, sift (if required by FDEP) on-site, and place on the beach directly from our site. If this cannot occur due to FDEP and City requirements, like at Jade Signature, we will rent land in west Miami- Dade County, haul the excavated sand for storage at this land, sift the sand there, and wait for further instructions on sand placement from the City and FDEP. Construction Trailer: Will a construction trailer be used? If so, show location? Construction trailers (for both managers and materials/equipment) will be required on- site. Please see the proposed locations on-site, below: 9 Traffic Control: Will this operation require occupying any traffic lanes, parking lanes, beachwalks or any other public right-of way? If yes, closures shall be per the regulations described in the Maintenance of Traffic (MOT) from the Florida Department of Transportation (FDOT). Please note that a Lane Closure Permit from the Code Compliance Department must be obtained prior to public right-of-way use. Similar to Jade Signature, sidewalk and lane closures will be required for certain key activities, such as: Deliveries and removal of extremely large and heavy equipment; utility work within the right-of-way and Collins Avenue; and, the mat foundation concrete pour. Again, like Jade Signature, the contractor will go through the proper channels to obtain FDOT approval, City of Sunny Isles Beach approval, and have numerous meetings to coordinate the effort beforehand. Then, execute the MOT plan with all required signage, barriers/barricades, lighting, certified flagmen, police details, etc. The process that the contractor at Jade Signature followed was to: 1. Meet with FDOT to review requirements for the project, timing, locations, etc. and received advice on how best to prepare the MOT application including all applicable MOT plans. 2. Prepare a draft of the MOT plans and review this draft of the plans with the City of Sunny Isles Beach (Code Compliance Department and the Police Department) 3. Finalize the MOT plans as necessary to comply with comments provided by the City of Sunny Isles Beach. 4. Submit MOT application and plans to FDOT and follow-up with another face-to- face meeting with the inspector/plans approver to address any additional concerns. 5. Receive MOT plan approval from FDOT. 6. Submit MOT application and FDOT approval to the City of Sunny Isles Beach (both Code Compliance Department and Police Department). 7. Request City of Sunny Isles Beach Policer Officers as necessary to comply with the MOT Plan and protect the safety of the public. 10 We will require our contractor to prevent trucks and other equipment from blocking traffic without the required MOT plan enactment. Parking: Indicate the number of workers and the areas where their vehicles will be parked through the duration of this phase of the project. The number of workers will vary during the course of the project, but at the peak, we expect approximately 225 individual workers. As the number of available parking spots and vacant lots continues to decrease in and around Sunny Isles Beach, we will ensure that workers carpool as much as possible. Further, we will secure parking at the Haulover Beach parking lots and bus the workers from the parking location to the construction site, then back to their vehicles at the end of their shift. Clean-up: Describe the measures that will be taken to ensure that the work site and public right-of-way will be maintained (including dust control, swale on driveways to prevent water leaks to the street, gutter buddies, rocks at driveways, etc.) Similar to Jade Signature, we will require the contractor to keep the construction site safe and clean, including the immediate area outside the construction site to provide an environment safe for walking pedestrians and personal vehicles. Specific measures that will be taken to ensure a clean jobsite are: 1. Truck tire-wash areas at all project site exits prior to leaving the project. At Jade Signature, the contractor developed steel grating to allow all tire surfaces to be cleaned with the mud/dirt falling into the gaps in the grating, preventing this mud/dirt from flowing into the street (see photo, below). The tires will be cleaned using pressure washers to ensure full removal of mud/dirt/concrete. 11 2. Like at Jade Signature, rather than have gravel or stone entrances and exits to/from the construction site, we will have the contractor provide and maintain a reinforced concrete apron, which is much easier to clean and maintain as opposed to gravel/stone. On the jobsite side of the concrete aprons, the contractor will install the wash-down grating described above. 3. Curb inlets in Collins Avenue along the length of the site will receive erosion control measures in accordance with the soon to be prepared, submitted, and approved erosion control plan. There are various types of these curb gutter inlet sediment prevention devices and our contractor will coordinate with the City and FDOT. Additionally, the sediment that gets collected on the outside of the sediment prevention device will be cleaned daily to prevent clogging, water ponding, and sediment build up. 4. The full-time gate attendants will receive specific training on cleaning and maintenance. They will wash down, sweep, and remove any dirt, sediment, and debris, whether deposited from the jobsite or not. These full-time gate attendants will also keep all sidewalks clear, clean, and safe at all times and, like at Jade Signature, will be trained to deal with non-construction related pedestrian and vehicular traffic. 5. The contractor will set up numerous water sources on-site for project individuals to spray down the site to minimize wind-blown dirt/sand from leaving the project. During site preparation and grading, a water truck will be used to wet the site. Fencing: Construction fencing must be constructed of durable material, and additional silt fencing for additional protection. Gates should be steady and properly secure during non-working hours. We take great pride in the “face” of our construction sites (the fencing) and require our contractors to install temporary construction fencing that is constructed in a permanent manner and in accordance with the City of Sunny Isles Beach requirements. The fencing will be constructed of thick, durable plywood that will either be painted or receive fastener-attached metal panel signage (similar to Jade Signature). The plywood will be securely mounted to an engineered structural support system made of either solid wood posts and stringers or hollow structural steel (“HSS”) shapes embedded into holes and encased in concrete. The back side of the fence will be lined with silt fence to prevent sediment run-off from the jobsite, under the fence, onto the sidewalk or other adjacent areas. All gates will be sliding gates, rather than swinging gates, to ensure that the gates do not accidentally swing into the right-of-way due to the strong winds in Sunny Isles Beach. The gates will be constructed of the same materials as the fencing in order to match the fence and provide a consistent look for the project. All gates will be secured with high-strength pad locks when closed at the end of each day. During the day, we will have full-time attendants at all open gates to prevent unauthorized access and ensure the safety of the public. This may also include providing a “warning barrier” in 12 lieu of a closed gate, only during working hours. Finally, like at Jade Signature, we may light the fence-mounted signage, upon approval from the City of Sunny Isles Beach. Provide erosion sediment control plans, if applicable. As we currently have not selected a contractor at this time, we have not had erosion and sediment control plans prepared. They will be prepared by a licensed, registered professional and will be in accordance with all national, State, County, and City requirements. Once prepared, we will have the selected contractor provide copies to amend this plan and obtain all required permits. III. Public Beach Access Protection and Closure Contractor Information: Please include name, company, address, phone number, email, cell phone number. To be determined Project Location: 18801 Collins Avenue, Sunny Isles Beach, FL 33160 Estimated Start Date – Walkway Protection: May 2017 (installation around the construction of 4th floor structure) Estimated Start Date – Walkway Closure: September 2019 (very end of project) Estimated Completion Date – Walkway Protection: September 2019 Estimated Completion Date – Walkway Closure: December 2019 (very end of project) Hours of Operation: For overhead walkway protection, the system will be in place twenty-four (24) hours a day, seven (7) days a week. For the Walkway Closure for beach access improvement project, refer to section II, above Project Task: Describe how and what will be demolished; include equipment to be used. Removal of pavers, base, landscaping, benches, lighting, signage, etc. to allow for installation of new beach access walkway in accordance with new City of Sunny Isles Beach standards. a. Bobcats b. Generators c. Trucks d. Small concrete pumps e. Concrete trucks f. Compaction equipment 13 Adjacent beach access available for public access: Signage, location, hours of operations, etc. Walkway protection details. Covered walkway will be engineered by a registered, licensed structural engineer in the State of Florida and submitted to the City of Sunny Isles Beach Building Department for permitting and approval (see photo and details, below) Clean-up and maintenance: Describe the measures that will be taken to ensure that the work site and public right-of-way will be maintained (including dust control) As you can see in the picture above, at Jade Signature, the beach access is kept very clean by having wind screen to prevent blowing dust from the jobsite, but also by having one of the gate attendants maintain the beach access two (2) or three (3) times a day, which includes picking up debris (whether construction-related or not), sweeping, and rinsing down, if necessary. Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional insured. See sample certificate of the finalized one that will be provided once a contractor is brought on board, below: 14 15 IV. Other Contractor Information: Please include name, company, address, phone number, email, cell phone number. To be determined Project Location: Estimated Start Date: Estimated Completion Date: Hours of Operation: Project Task: Describe how and what will be demolished; include equipment to be used. Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional insured. 16 TRUCK ROUTE(S) Please attach Route Map 1 | P a g e October 29, 2015 Mr. Ron Choron La Playa Beach Associates, LLC 1300 Brickell Avenue Miami, Florida 33131 Phone: (786) 295-4595 E-mail: rlchoron@fortuneintlgroup.com Re: Varadero Shared Parking Analysis - #15158 Dear Mr. Choron, We have completed a shared parking analysis for the proposed Varadero project. The proposed project is located at 18801 Collins Avenue in Sunny Isles Beach, Florida. The project is proposing to redevelop an existing hotel and residential condominium. The proposed project will have a total of 431 residential units, 60 hotel rooms, 90 condo-hotel rooms, and various amenities such as: Spa and Fitness, Bar/Lounge, Restaurant, Ballroom/Assembly, and Administrative Office space. The analysis was based on the development program shown in Exhibit 1. Parking Generation A parking analysis was conducted for the project to determine if the proposed number of parking spaces is sufficient to satisfy the anticipated peak parking demand for the weekday and weekend conditions. To determine the required number of parking spaces, parking rates provided in the city of Sunny Isles Beach Code of Ordinances were used (see attachment 1). Exhibit 2 shows the results of the parking analysis. 2 | P a g e Exhibit 1 Development Program Land Use Residential- 1 Bedrooms < 1800 SF 97 Units Residential- 2 Bedrooms < 1800 SF 74 Units Residential- 3 Bedrooms > 1800 SF 155 Units Residential- 4 Bedrooms > 1800 SF 95 Units Residential- 5 Bedrooms > 1800 SF 4 Units Residential- Penthouse > 1800 SF 6 Units Hotel - Standard < 750 SF 48 Rooms Hotel - Park Suites 750 < > 1000 SF 6 Rooms Hotel - Junior Suites > 1000 SF 6 Rooms Apartment Hotel- 1 Bed < 800 SF 24 Rooms Apartment Hotel- 2 Bed 800 < > 1000 SF 54 Rooms Apartment Hotel- 3 Bed > 1000 SF 12 Rooms Spa and Fitness 4,847 SF 4,847 SF Bar/Lounge 1,177 SF 1,177 SF Restaurant 4,776 SF 4,776 SF Ballroom/Assembly 9,034 SF 9,034 SF Office (Admin) 2,161 SF 2,161 SF Size Units 3 | P a g e Exhibit 2 Parking Analysis It should be noted that these rates are based on actual parking demand by the individual land uses. However, these parking demands do not occur at the same time of the day. Therefore a shared parking analysis based on the procedures outlined on the ULI Shared Parking, 2nd Edition was conducted for the project. Attachment 1 also includes the ULI published tables used. Land Use Sunny Isle Parking Requirement Rate Total Parking Residential- 1 Bedrooms 97 Units 1.5 space / room 1.5 146 Residential- 2 Bedrooms 74 Units 1.5 space / room 1.5 111 Residential- 3 Bedrooms 155 Units 2 space / room 2 310 Residential- 4 Bedrooms 95 Units 2 space / room 2 190 Residential- 5 Bedrooms 4 Units 2 space / room 2 8 Residential- Penthouse 6 Units 2 space / room 2 12 Hotel - Standard 48 Rooms 1 space / room 1 48 Hotel - Park Suites 6 Rooms 1 space / room 1 6 Hotel - Junior Suites 6 Rooms 1 space / room 1 6 Apartment Hotel- 1 Bed 24 Rooms 1 space / room 1 24 Apartment Hotel- 2 Bed 54 Rooms 1.75 space / room 1.75 95 Apartment Hotel- 3 Bed 12 Rooms 2 space / room 2 24 Spa and Fitness 4,847 SF 1 space / 250 SF of GFA 250 20 Bar/Lounge 1,177 SF 1 space / 100 SF of GFA 100 12 Restaurant 4,776 SF 1 space / 100 SF of GFA 100 48 Ballroom/Assembly 9,034 SF 1 space / 200 SF of GFA 200 46 Office (Admin) 2,161 SF 1 space / 300 SF of GFA 300 8 1,114Total Parking Spaces Units 4 | P a g e Shared Parking Analysis Shared parking is the use of parking spaces to serve two or more individual land uses without conflict or encroachment. The ability to share parking spaces is the result of variations in the accumulation of vehicles by hour, by day or by season at the individual land uses. The shared parking principle also accounts for the relationships among the land uses that result in visiting multiple uses on the same auto trip and the mode of transportation used to reach the site. The main goal of shared parking is to determine a balance between providing enough parking to support a development and reducing the excessive area dedicated to parking. Shared parking analysis was conducted for the project based on the procedures outlined in the Urban Land Institute (ULI) Shared Parking, 2nd Edition and parking rates provided in the city of Sunny Isles Beach Code of Ordinances (Article VIII). The hourly distribution analysis was conducted for both, a typical weekday and a weekend. The results of the analysis show that the highest accumulation of parking occurs during a typical weekend between 9:00 PM and 10:00 PM. Attachment 2 includes the results of the analysis. Parking requirements based on the individual land uses were adjusted to account for seasonal variations, hourly distribution, non-captive ratios and mode adjustments to estimate the actual number of parking spaces required for the site. It should be noted that the hourly parking demand distribution for the residential component of the development was assumed to be 100%. In essence the residential parking spaces were not accounted for in the shared parking calculations. The result of the shared parking analysis shows that the proposed project requires 1,022 parking spaces to satisfy the maximum parking requirement. Exhibit 3 shows the results of the analysis. 5 | P a g e Unadjusted Parking Requirement Month Adjustment Late December Peak Hour Adjustment Weekdend at 9 pm Non-captive Adjustment Mode Adjustment Adjusted Parking Requirement Late December Weekend at 9 pm Residential- 1 Bedrooms1 Resident 146 100% 100% 100% 100% 146 Residential- 2 Bedrooms1 Resident 111 100% 100% 100% 100% 111 Residential- 3 Bedrooms1 Resident 310 100% 100% 100% 100% 310 Residential- 3 Bedrooms1 Resident 190 100% 100% 100% 100% 190 Residential- 5 Bedrooms1 Resident 8 100% 100% 100% 100% 8 Residential- Penthouse1 Resident 12 100% 100% 100% 100% 12 Hotel - Standard Guest 37 100% 95% 100% 95% 34 Employees 11 100% 55% 100% 90% 5 Hotel - Park Suites Guest 5 100% 95% 100% 95% 4 Employees 1 100% 55% 100% 90% 1 Hotel - Junior Suites Guest 5 100% 95% 100% 95% 4 Employees 1 100% 55% 100% 90% 1 Apartment Hotel- 1 Bed Guest 19 100% 95% 100% 95% 17 Employees 5 100% 55% 100% 90% 3 Apartment Hotel- 2 Bed Guest 74 100% 95% 100% 95% 67 Employees 21 100% 55% 100% 90% 10 Apartment Hotel- 3 Bed Guest 19 100% 95% 100% 95% 17 Employees 5 100% 55% 100% 90% 3 Spa and Fitness Customer 19 95% 10% 95% 100% 2 (Health Club) Employees 1 100% 20% 100% 95% 0 Bar/Lounge Customer 12 95% 67% 95% 95% 7 Restaurant Customer 48 95% 67% 95% 95% 28 Ballroom/Assembly Customer 46 100% 100% 95% 95% 42 Office (Admin) Visitors 1 80%0% 100% 100% 0 Employees 7 80%0% 100% 100% 0 TOTAL REQUIRED 1,114 TOTAL REQUIRED WITH SHARED PARKING 1,022 1 Residential hourly parking demand distribution was assumed to be 100% Land Use Exhibit 3 Shared Parking Analysis Required Number of Parking Spaces 6 | P a g e Parking Management Strategies The project has developed a Parking Management Plan to ensure an efficient parking system that is convenient to both commercial uses and residents as well as to protect residential neighborhoods from spillover parking. Shared Parking Shared parking is the use of parking spaces to serve two or more individual land uses. The ability to share parking spaces is the result of variations in the accumulation of vehicles by hour and by day at the individual land uses. A shared parking analysis was conducted for this project and the results are presented above. Pedestrian / Bicyclist - The project is located in an area conducive to pedestrian and bicycle activities. The area surrounding the proposed Varadero project has a comprehensive sidewalk network, signalized intersections with clearly marked crosswalks, and pedestrian signals. This environment promotes walking and bicycling as a means of transportation and further reduces the need for off-street parking. Transit - The area surrounding the project is served by mass transit. There are approximately 4 bus routes in the vicinity of the project; in addition to the Sunny Isles Beach Community Shuttle. The use of mass transit is another effective way to reduce the need for off-street parking. In addition, there are other parking management strategies that could have a significant impact on the reduction of off-street parking. The proposed project will consider using the following strategies to improve the efficiency of the parking areas and reduce the parking demand: • Provide tandem parking for valet use. • Encourage businesses to implement commuter trip reduction programs for their employees. • Provide information to residents, employees and visitors about transit, ridesharing and bicycle facilities options. Attachment 1 8/7/2015 Sunny Isles Beach, FL Code of Ordinances about:blank 8/20 Townhouse 2 parking spaces per unit Multifamily dwelling 1.5 parking spaces per unit except that a unit with the size of 1,800 square feet or greater shall be required to provide 2 parking spaces per unit (Ord. No. 2012-383, § 2, 2-16- 2012) For 20 units or more guest parking must be provided equal to a minimum of 5% of the required spaces for buildings without valet parking Dormitories, sororities, fraternities 1 parking space per bed Apartment-hotels 1 parking space per each efficiency or 1-bedroom unit 1 ¾ parking spaces per each 2-bedroom unit 2 parking spaces per each 3- or more bedroom unit 1 additional space for units with "lockout" bedrooms Hotels 1 parking space per each room or suite Hotels in the MU-R District 1 parking space per each room or suite plus 1 space per every 100 square foot of restaurant, lounge, nightclub, or similar establishment dispensing food and/or beverages Hotels in the B-2 District 1 parking space per each room or suite plus 50% of the requirements of this chapter for ancillary retail and service sues within the hotel without ground level window exposure and/or exterior entrances facing the street 1 parking space per each room or suite plus 35% of the requirements of this chapter for ancillary retail and service sues within the hotel and with ground level window exposure and/or exterior entrances facing the street Adult retirement communities 1 parking space per each dwelling unit plus 1 space for each employee on the day shift Assisted-living facilities, nursing homes 1/2 parking space per bed plus 1 space for each employee on the day shift 8/7/2015 Sunny Isles Beach, FL Code of Ordinances about:blank 9/20 Extended or long-term living facilities, hospices 1/2 parking space per bed plus 1 space for each employee on the day shift   Minimum Parking Spaces Required Nonresidential: Amusement and Recreational Facilities Use Number of Spaces Amusement center, general 1 space per 200 square feet of GFA Arenas and stadiums 1 space per 4 seats or 1 space per 200 square feet of GFA Baseball/softball diamonds 20 spaces per diamond Auditorium 1 space per 4 seats or 1 space per 200 square feet GFA, whichever is greater Batting cages 2 spaces per cage Billboard/pool center 1 space per 150 square feet GFA Bowling center 4 spaces per lane plus additional parking according to this chapter for any restaurant, lounge or retail component Cinema/movie theater 1 space per 4 seats Community centers (nongovernmental) 1 space 250 square feet GFA Outdoor courts (tennis, racquetball, handball, etc.) 3 spaces per court Dance hall 1 space per 4 seats or 1 space per 200 square feet of GFA, whichever is greater Dance school 1 space per 200 square feet of GFA Indoor court facility 4 spaces per court plus additional parking according to this chapter for any spa, restaurant, lounge or retail component Commercial marinas 5 spaces, plus 1 space for every 2 slips, plus 1 space for each 10 dry-storage spaces, plus 1 space for each 350 16 [] 8/7/2015 Sunny Isles Beach, FL Code of Ordinances about:blank 11/20 Post offices 1 space per 100 square feet of area accessible to the public Elementary & middle schools 5 spaces plus 1 space per classroom or 1 space per 10 seats of the largest assembly room, whichever is larger Nursery schools 5 spaces plus one per employee or 1 space per 400 square feet of GFA, whichever is greater Secondary schools 10 spaces plus 1 space per classroom, plus 1 space for each 5 students or 1 space per 10 seats of largest assembly room, whichever is greater   Minimum Parking Spaces Required Nonresidential: Light Manufacturing and Warehousing Use Use Number of Spaces Building supplies 1 space per 400 square feet GFA Contractor shops (general, electrical, plumbing, roofing, a/c) 1 space per 400 square feet GFA Marine supplies 1 space per 500 square feet GFA Medical supplies 1 space per 500 square feet GFA Research and testing labs 1 space per 500 square feet GFA Self-storage warehouses 1 space per 500 square feet GFA plus 1 space per 300 GFA for any office component   Minimum Parking Spaces Required Nonresidential: Offices, Medical and Professional Use Number of Spaces Business and professional offices 1 space per 300 square feet GFA Attachment 2 Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Parking Rate Parking Rate Parking Rate Parking Rate Parking Rate Parking Rate Parking Rate Parking Re s i d e n t i a l - 1 B e d r o o m s 1 Re s i d e n t 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 146 100%146 100%146 100%146 100%146 100%146 100%146 100%146 Re s i d e n t i a l - 2 B e d r o o m s 1 Re s i d e n t 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 111 100%111 100%111 100%111 100%111 100%111 100%111 100%111 Re s i d e n t i a l - 3 B e d r o o m s 1 Re s i d e n t 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 310 100%310 100%310 100%310 100%310 100%310 100%310 100%310 Re s i d e n t i a l - 3 B e d r o o m s 1 Re s i d e n t 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 190 100%190 100%190 100%190 100%190 100%190 100%190 100%190 Re s i d e n t i a l - 5 B e d r o o m s 1 Re s i d e n t 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 100%8 100%8 100%8 100%8 100%8 100%8 100%8 Re s i d e n t i a l - P e n t h o u s e 1 Re s i d e n t 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 100%12 100%12 100%12 100%12 100%12 100%12 100%12 Ho t e l - S t a n d a r d G u e s t 37 95 % 36 95 % 36 90 % 34 80 % 30 70 % 26 70 % 26 65 % 24 65 % 24 70 % 26 70 % 26 75 % 28 80 % 30 85%32 85%32 90%34 95%36 95%36 100%37 100%37 Em p l o y e e s 11 5% 1 30 % 3 90 % 10 90 % 10 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 90 % 10 70 % 7 40%4 20%2 20%2 20%2 20%2 10%1 5%1 Ho t e l - P a r k S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 70 % 1 40%1 20%0 20%0 20%0 20%0 10%0 5%0 Ho t e l - J u n i o r S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 70 % 1 40%1 20%0 20%0 20%0 20%0 10%0 5%0 Ap a r t m e n t H o t e l - 1 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 70 % 4 40%2 20%1 20%1 20%1 20%1 10%1 5%0 Ap a r t m e n t H o t e l - 2 B e d G u e s t 74 95 % 70 95 % 70 90 % 67 80 % 59 70 % 52 70 % 52 65 % 48 65 % 48 70 % 52 70 % 52 75 % 56 80 % 59 85%63 85%63 90%67 95%70 95%70 100%74 100%74 Em p l o y e e s 21 5% 1 30 % 6 90 % 19 90 % 19 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 90 % 19 70 % 15 40%8 20%4 20%4 20%4 20%4 10%2 5%1 Ap a r t m e n t H o t e l - 3 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 70 % 4 40%2 20%1 20%1 20%1 20%1 10%1 5%0 Sp a a n d F i t n e s s C u s t o m e r 19 70 % 13 40 % 8 40 % 8 70 % 13 70 % 13 80 % 15 60 % 11 70 % 13 70 % 13 70 % 13 80 % 15 90 % 17 100%19 90%17 80%15 70%13 35%7 10%2 0%0 (H e a l t h C l u b ) E m p l o y e e s 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 10 0 % 1 100%1 75%1 50%1 20%0 20%0 20%0 0%0 Ba r / L o u n g e C u s t o m e r 12 0% 0 10 % 1 30 % 4 10 % 1 10 % 1 5% 1 10 0 % 12 10 0 % 12 33 % 4 10 % 1 10 % 1 30 % 4 55%7 60%7 70%8 67%8 60%7 40%5 30%4 Re s t a u r a n t C u s t o m e r 48 0% 0 10 % 5 30 % 14 10 % 5 10 % 5 5% 2 10 0 % 48 10 0 % 48 33 % 16 10 % 5 10 % 5 30 % 14 55%26 60%29 70%34 67%32 60%29 40%19 30%14 Ba l l r o o m / A s s e m b l y C u s t o m e r 46 0% 0 0% 0 30 % 14 60 % 28 60 % 28 60 % 28 65 % 30 65 % 30 65 % 30 65 % 30 65 % 30 10 0 % 46 100%46 100%46 100%46 100%46 50%23 0%0 0%0 Of f i c e ( A d m i n ) V i s i t o r s 1 0% 0 1% 0 20 % 0 60 % 0 10 0 % 1 45 % 0 15 % 0 45 % 0 10 0 % 1 45 % 0 15 % 0 10 % 0 5%0 2%0 1%0 0%0 0%0 0%0 0%0 Em p l o y e e s 7 3% 0 30 % 2 75 % 6 95 % 7 10 0 % 7 10 0 % 7 90 % 7 90 % 7 10 0 % 7 10 0 % 7 90 % 7 50 % 4 25%2 10%1 7%1 3%0 1%0 0%0 0%0 TO T A L 11 1 4 94 3 95 7 10 0 8 10 0 0 98 7 98 5 10 3 2 10 3 4 10 0 3 98 8 99 7 1022 1031 1021 1033 1034 1001 967 956 1 R e s i d e n t i a l h o u r l y p a r k i n g d e m a n d d i s t r i b u t i o n w a s a s s u m e d t o b e 1 0 0 % We e k d a y C o n d i t i o n s No o n 1: 0 0 P M Midnight 11:00 PM 5: 0 0 P M 4: 0 0 P M Re q u i r e d Pa r k i n g La n d U s e Va r a d e r o 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6: 0 0 A M 7: 0 0 A M 8: 0 0 A M 9: 0 0 A M 10 : 0 0 A M Sh a r e d P a r k i n g A n a l y s i s B a s e d o n C i t y C o d e 11 : 0 0 A M 6:00 PM 2: 0 0 P M 3: 0 0 P M Ti m e - o f - D a y Ra t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a te Parking Re s i d e n t i a l - 1 B e d r o o m s 1 Re s i d e n t 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 10 0 % 14 6 100%146 100%146 100%146 100%146 100%146 100%146 100%146 Re s i d e n t i a l - 2 B e d r o o m s 1 Re s i d e n t 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 10 0 % 11 1 100%111 100%111 100%111 100%111 100%111 100%111 100%111 Re s i d e n t i a l - 3 B e d r o o m s 1 Re s i d e n t 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 10 0 % 31 0 100%310 100%310 100%310 100%310 100%310 100%310 100%310 Re s i d e n t i a l - 3 B e d r o o m s 1 Re s i d e n t 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 10 0 % 19 0 100%190 100%190 100%190 100%190 100%190 100%190 100%190 Re s i d e n t i a l - 5 B e d r o o m s 1 Re s i d e n t 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 10 0 % 8 100%8 100%8 100%8 100%8 100%8 100%8 100%8 Re s i d e n t i a l - P e n t h o u s e 1 Re s i d e n t 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 10 0 % 12 100%12 100%12 100%12 100%12 100%12 100%12 100%12 Ho t e l - S t a n d a r d G u e s t 37 95 % 36 95 % 36 90 % 34 80 % 30 70 % 26 70 % 26 65 % 24 65 % 24 70 % 26 70 % 26 75 % 28 80 % 30 85%32 85%32 90%34 95%36 95%36 100%37 100%37 Em p l o y e e s 11 5% 1 30 % 3 90 % 10 90 % 10 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 90 % 10 75 % 8 60%6 55%6 55%6 55%6 45%5 45%5 30%3 Ho t e l - P a r k S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 75 % 1 60%1 55%1 55%1 55%1 45%1 45%1 30%0 Ho t e l - J u n i o r S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 75 % 1 60%1 55%1 55%1 55%1 45%1 45%1 30%0 Ap a r t m e n t H o t e l - 1 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 75 % 4 60%3 55%3 55%3 55%3 45%2 45%2 30%2 Ap a r t m e n t H o t e l - 2 B e d G u e s t 74 95 % 70 95 % 70 90 % 67 80 % 59 70 % 52 70 % 52 65 % 48 65 % 48 70 % 52 70 % 52 75 % 56 80 % 59 85%63 85%63 90%67 95%70 95%70 100%74 100%74 Em p l o y e e s 21 5% 1 30 % 6 90 % 19 90 % 19 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 90 % 19 75 % 16 60%13 55%11 55%11 55%11 45%9 45%9 30%6 Ap a r t m e n t H o t e l - 3 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 75 % 4 60%3 55%3 55%3 55%3 45%2 45%2 30%2 Sp a a n d F i t n e s s C u s t o m e r 19 80 % 15 45 % 8 35 % 7 50 % 9 35 % 7 50 % 9 50 % 9 30 % 6 25 % 5 30 % 6 55 % 10 10 0 % 19 95%18 60%11 30%6 10%2 1%0 1%0 0%0 (H e a l t h C l u b ) E m p l o y e e s 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 75 % 1 10 0 % 1 100%1 75%1 50%1 20%0 20%0 20%0 0%0 Ba r / L o u n g e C u s t o m e r 12 0% 0 10 % 1 30 % 4 10 % 1 10 % 1 5% 1 10 0 % 12 10 0 % 12 33 % 4 10 % 1 10 % 1 30 % 4 55%7 60%7 70%8 67%8 60%7 40%5 30%4 Re s t a u r a n t C u s t o m e r 48 0% 0 10 % 5 30 % 14 10 % 5 10 % 5 5% 2 10 0 % 48 10 0 % 48 33 % 16 10 % 5 10 % 5 30 % 14 55%26 60%29 70%34 67%32 60%29 40%19 30%14 Ba l l r o o m / A s s e m b l y C u s t o m e r 46 0% 0 0% 0 30 % 14 60 % 28 60 % 28 60 % 28 65 % 30 65 % 30 65 % 30 65 % 30 65 % 30 10 0 % 46 100%46 100%46 100%46 100%46 50%23 0%0 0%0 Of f i c e ( A d m i n ) V i s i t o r s 1 0% 0 20 % 0 60 % 0 80 % 1 90 % 1 10 0 % 1 90 % 1 80 % 1 60 % 0 40 % 0 20 % 0 10 % 0 5%0 0%0 0%0 0%0 0%0 0%0 0%0 Em p l o y e e s 7 0% 0 20 % 1 60 % 4 80 % 6 90 % 7 10 0 % 7 90 % 7 80 % 6 60 % 4 40 % 3 20 % 1 10 % 1 5%0 0%0 0%0 0%0 0%0 0%0 0%0 TO T A L 11 1 4 94 5 95 6 10 0 5 99 6 98 1 98 0 10 3 1 10 2 7 99 1 97 7 98 6 10 2 3 1037 1031 1040 1040 1006 980 967 1 R e s i d e n t i a l h o u r l y p a r k i n g d e m a n d d i s t r i b u t i o n w a s a s s u m e d t o b e 1 0 0 % 2: 0 0 P M Va r a d e r o Sh a r e d P a r k i n g A n a l y s i s B a s e d o n C i t y C o d e We e k e n d C o n d i t i o n s La n d U s e Re q u i r e d Pa r k i n g Ti m e - o f - D a y 6: 0 0 A M 7 : 0 0 A M 8 : 0 0 A M 9 : 0 0 A M 1 0 : 0 0 A M 1 1 : 0 0 A M N o o n 1 : 0 0 P M 9:00 PM 10:00 PM 11:00 PM Midnight 3: 0 0 P M 4 : 0 0 P M 5 : 0 0 P M 6 : 0 0 P M 7 : 0 0 P M 8 : 0 0 P M VARADEROTraffic Study DAVID PLUMMER & ASSOCIATES DAVID PLUMMER & ASSOCIATES Varadero Traffic Study Page i TABLE OF CONTENTS Page List of Exhibits ................................................................................................................................ ii EXECUTIVE SUMMARY .......................................................................................................... iii 1.0 INTRODUCTION ............................................................................................................. 1 1.1 Project Background ................................................................................................. 1 1.2 Study Objective ....................................................................................................... 1 1.3 Study Area and Methodology .................................................................................. 1 1.4 Project Site Information .......................................................................................... 6 2.0 EXISTING CONDITIONS ............................................................................................... 7 2.1 Roadway Characteristics ......................................................................................... 7 2.2 Traffic Counts .......................................................................................................... 8 2.3 Intersection Data ...................................................................................................... 8 2.4 Intersection Capacity Analysis ................................................................................ 8 3.0 PLANNED AND PROGRAMMED ROADWAY IMPROVEMENTS ...................... 12 4.0 FUTURE TRAFFIC CONDITIONS ............................................................................. 13 4.1 Background Traffic and Committed Developments .............................................. 13 4.2 Future Without Project Intersection Analysis ....................................................... 14 4.3 Project Trip Generation ......................................................................................... 16 4.4 Project Trip Assignment ....................................................................................... 18 4.5 Future With Project Intersection Capacity Analysis ............................................. 20 5.0 QUEUING ANALYSIS ................................................................................................... 23 5.1 Valet Drop-off / Pick-up Area ............................................................................... 23 6.0 CONCLUSIONS .............................................................................................................. 31 Appendix A: Site Plan Appendix B: Traffic Data Collection Appendix C: Intersection Capacity Analysis Worksheets Appendix D: Background Growth Rate Documentation Appendix E: Committed Development Information Appendix F: Site Trip Generation Appendix G: Queuing Documentation Varadero Traffic Study Page ii LIST OF EXHIBITS Exhibit Page 1 Location Map ....................................................................................................................... 2 2 Existing Peak Hour Traffic Volumes .................................................................................. 9 3 Existing Lane Configurations ............................................................................................ 10 4 Existing Intersection Capacity Analysis ............................................................................ 11 5 Committed Development Trip Generation ........................................................................ 13 6 Future without Project Intersection Capacity Analysis ..................................................... 14 7 Future without Project Peak Hour Traffic Volumes .......................................................... 15 8 Project Trip Generation Summary ..................................................................................... 16 9 Cardinal Distribution ......................................................................................................... 18 10 Project Trip Distribution .................................................................................................... 19 11 Future with Project Peak Hour Traffic Volumes ............................................................... 21 12 Future with Project Intersection Capacity Analysis .......................................................... 22 13 Project Trip Generation – PM Peak Hour ......................................................................... 23 14 Valet Processing Rate – Station 1 ..................................................................................... 25 14A Queue Calculations – Station 1 ......................................................................................... 26 15 Valet Processing Rate – Station 2 ..................................................................................... 27 15A Queue Calculations – Station 2 ......................................................................................... 28 16 Valet Processing Rate – Station 3 ..................................................................................... 29 16A Queue Calculations – Station 3 ......................................................................................... 30 Varadero Traffic Study Page iii EXECUTIVE SUMMARY The Varadero project will be located at 18801 Collins Avenue in Sunny Isles Beach, Florida. The project proposes 431 residential condominium units, 90 condo-hotel units, 60 hotel rooms, a 1,177 SF lobby lounge, a 4,776 SF restaurant, a 4,776 SF gym/spa, and 2,161 SF of office space, replacing 349 hotel/condo-hotel units. The main access to the project will be through a two-way driveway located at the east leg of the unsignalized intersection of Collins Avenue and 188th Block. A second two-way driveway north of the main entrance will be provided also accessing Collins Avenue. A third two-way driveway located at the north end of the project will also access Collins Avenue. For the purpose of this traffic analysis, project build-out is anticipated by 2017. An assessment of the traffic impacts associated with the Varadero project was performed. All of the analyzed intersections currently operate, and will continue to operate within the City’s adopted LOS standards. As with existing and future without project conditions, the minor approaches and southbound left movement at the Collins Avenue / 186th Street and Collins Avenue / 188th Block intersections are projected to operate at low levels of service and experiencing some delay. This is due to the fact that for un-signalized intersections the software tends to overestimate delay measurements for the minor approaches and does not account for gaps in traffic created by the upstream signalized intersections to allow the minor street traffic flow. If the minor approach delays do reach the software estimates, observed behavior shows drivers will find alternate routes. An assessment of circulation as it relates to the valet services during the PM peak hour was performed. The queuing analysis shows that the anticipated queue at the designated valet drop- off / pick-up areas during the typical PM peak traffic conditions can be accommodated within the project site at each of the three proposed stations. Varadero Traffic Study Page 1 1.0 INTRODUCTION 1.1 Project Background The Varadero project will be located at 18801 Collins Avenue in Sunny Isles Beach, Florida (see Exhibit 1). The project proposes 431 residential condominium units, 90 condo-hotel units, 60 hotel rooms, a 1,177 SF lobby lounge, a 4,776 SF restaurant, a 4,776 SF gym/spa, and 2,161 SF of office space, replacing 349 hotel/condo-hotel units. The main access to the project will be through a two-way driveway located at the east leg of the unsignalized intersection of Collins Avenue and 188th Block. A second two-way driveway north of the main entrance will be provided also accessing Collins Avenue. A third two-way driveway located at the north end of the project will also access Collins Avenue. The project site plan is included in Appendix A. For the purpose of this traffic analysis, project build-out is anticipated by 2017. 1.2 Study Objective The proposed project is currently applying for development approval with the city of Sunny Isles Beach. The purpose of this study is to assess the traffic impacts associated with the proposed uses. 1.3 Study Area and Methodology The proposed methodology is outlined below: Study Area The study area for the project will include the following intersections: • Collins Avenue / 189th Street • Collins Avenue / 188th Block • Collins Avenue / 186th Street • Collins Avenue / 185th Street • Collins Avenue / William Lehman Causeway (SR856) DAVID PLUMMER & ASSOCIATES | Project No. 15158 | November 2015 Project Location p.2 Exhibit 1 Location Map 189TH STREET 188TH BLOCK 186TH STREET 185TH STREET CO L L I N S A V E N U E WILLIAM LEHMAN CAUSEWAY Varadero Traffic Study Page 3 Analysis Scenarios The analysis scenarios for this study are as follows: • Existing year • Project build-out year (2017) without project trips (background traffic) • Project build-out year (2017) with project trips (total traffic) Data Collection • Vehicle turning movement counts were collected during the AM (7– 9) and PM (4 – 6) peak hour conditions of a regular weekday. • Collected counts were adjusted to reflect AM and PM peak hour peak season conditions for the intersection analysis. The traffic volumes were adjusted by applying the corresponding peak season conversion factors obtained from the latest Florida Department of Transportation (FDOT) Peak Season Factor Category Report. • Field reviews were performed to obtain existing physical and operating characteristics of the roadway network within the study area. Data to be acquired will include the number and type of traffic lanes, intersection geometrics, signal timings, speed limit information, and other appropriate physical and operating characteristics. • Roadway improvements included within the first three years of the five‐year FDOT Work Program or roadway improvements identified by the city of Sunny Isles Beach were assumed as committed for analysis purposes. Existing Conditions Intersection Capacity Analysis • Intersection capacity analyses were evaluated for the study area intersections using the Synchro software. All input files will be provided for review purposes. Varadero Traffic Study Page 4 Future Conditions Intersection Analysis – Background Traffic Conditions • Future background traffic volumes were determined by applying a compound growth rate to existing volumes and adding committed development traffic. The growth rate was calculated based on a review of historical volumes obtained from FDOT and Miami-Dade County. If the historical growth rate is calculated to be less than 0.5 percent, 0.5 percent annual growth will be used for analysis purposes. • Committed development information was provided by the city of Sunny Isles Beach. • Intersection capacity analyses were evaluated using the Synchro software. Signal timings were optimized for future conditions analyses. Project Trip Generation Using information contained in the Institute of Transportation Engineer’s (ITE) Trip Generation Manual, 9th Edition, trips associated with the proposed development were estimated. Pass‐by capture and internal capture were established based on the ITE, Trip Generation Manual, Users Guide and Handbook, 9th Edition. Exiting Land Use size will be verified with the city. ITE regression equation for the existing and proposed uses will be used if either the data plot has 20 points or R2 ≥ 0.75. Project Trip Distribution Net new external project traffic was assigned to the adjacent street network by assuming that 50% of the project traffic will come to/from the north and 50% to/from the south. Normal traffic patterns were also considered when assigning project trips. Varadero Traffic Study Page 5 Future Conditions Intersection Analysis – Total Traffic Conditions • Future total traffic volumes were determined by summing project trips and background traffic volumes. • Intersection capacity analyses were evaluated using the Synchro software. Access driveways were included as part of the LOS analysis .Signal timings may be optimized for future conditions analyses. • For intersections that fail to operate at an acceptable level of service, improvements will be recommended to mitigate the impacts of project trips from the proposed development. The improvements are intended to mitigate project traffic impacts, the improvements will not necessarily result in the intersection operating at an acceptable level of service. Queuing Analysis The potential queue at the projects’ drop-off areas was calculated based on the peak hour traffic published by ITE’s Trip Generation, Ninth Edition. The project trip generation for the PM peak hour (the critical inbound hour) was used for the analysis. A processing rate was used for valet operations. Arrival flow rate from the traffic distribution were converted to a random distribution using the Poisson formula (if applicable). The queuing analysis was based on the ITE’s Transportation and Land Development publication – using Poisson arrivals and negative exponential service time. Varadero Traffic Study Page 6 1.4 Project Site Information The Varadero project will be located at 18801 Collins Avenue in Sunny Isles Beach, Florida. The project proposes 431 residential condominium units, 90 condo-hotel units, 60 hotel rooms, a 1,177 SF lobby lounge, a 4,776 SF restaurant, a 4,776 SF gym/spa, and 2,161 SF of office space, replacing 349 hotel/condo-hotel units. The main access to the project will be through a two-way driveway located at the east leg of the unsignalized intersection of Collins Avenue and 188th Block. This driveway will provide access to the parking garage level as well as to the drop-off / pick-up level (valet station 2 & station 3). A second two-way driveway north of the main entrance will also be accessing Collins Avenue; providing access to parking garage only. A third two-way driveway located at the north end of the project will also access Collins Avenue. This driveway will provide access to the parking garage level as well as to the drop-off / pick-up level (valet station 1). Three separate valet drop-off / pick-up stations will be provided for the convenience of patrons. The valet drop-off / pick-up stations will be located at each proposed residential lobby and at the hotel lobby. The project site plan is included in Appendix A. Varadero Traffic Study Page 7 2.0 EXISTING CONDITIONS Data collection for this study included roadway characteristics, intersection traffic counts, signal timing, and seasonal adjustment factors. The data collection effort is described in the following sections. 2.1 Roadway Characteristics Collins Avenue Collins Avenue (SR AIA) is a major arterial that provides north/south access all along the city of Sunny Isles Beach. Within the project vicinity, Collins Avenue is a six-lane divided two-way roadway. The posted speed limit is 35 mph. There is no on-street parking on Collins Avenue within the study area. FDOT has jurisdiction over Collins Avenue. 185th Street 185th Street is a local roadway that runs east/west between the intra-costal waterway and Collins Avenue. The roadway is a two-lane two-way undivided local road. The city of Sunny Isles Beach has jurisdiction over 185th Street. The posted speed limit is 20 mph. 186th Street 186th Street is a local roadway that runs east/west between the intra-costal waterway and Collins Avenue. The roadway is a two-lane two-way undivided local road. The city of Sunny Isles Beach has jurisdiction over 186th Street. The posted speed limit is 20 mph. 189th Street 189th Street is a local roadway that runs east/west the intra-costal waterway and Collins Avenue. The roadway is a two-lane two-way undivided local road. The city of Sunny Isles Beach has jurisdiction over 189th Street. The posted speed limit is 20 mph. William Lehman Causeway (SR856) William Lehamn Causeway is a state own road that runs east/west between mainland Miami-Dade County, over the intra-costal waterway and it terminates at Collins Avenue. The roadway is an six-lane two-way divided roadway. The posted speed limit is 45 mph for this segment. Varadero Traffic Study Page 8 2.2 Traffic Counts Peak hour vehicle turning movement counts were collected on May 27, 2015 between 7:00 and 9:00 AM and between 4:00 and 6:00 PM. The latest weekly volume adjustment factors were obtained from FDOT. A peak season conversion factor (PSCF) of 1.03 (for Miami-Dade County North) corresponding to the date of the counts was used to adjust the raw traffic counts to peak season conditions. The counts are provided in Appendix B. Existing volumes at the intersections are graphically portrayed in Exhibit 2. 2.3 Intersection Data Existing signal phasing and timing for all the intersections were obtained from Miami-Dade County. This information was used for the signal phasing and timing required for the intersection capacity analysis and can be seen in Appendix B. A field survey was conducted to obtain the intersection lane configurations to be used in the intersection analysis. Exhibit 3 shows the existing lane configurations at the analyzed intersections. 2.4 Intersection Capacity Analysis The Synchro software was used to perform intersection capacity analysis at the analyzed intersections. Synchro is a macroscopic analysis and optimization software application that implements the Intersection Capacity Utilization method for determining intersection capacity. Synchro also supports the Highway Capacity Manual’s methodology for signalized / un-signalized intersections. Exhibit 4 shows the resulting LOS for existing weekday AM and PM peak hour conditions. The analysis indicates that the overall operations of all the intersections analyzed currently operate within the City’s LOS standards. However, minor approaches and southbound left movement at the Collins Avenue / 186th Street and Collins Avenue / 188th Block intersections are currently operating at low levels of service and experiencing some delay. This is due to the fact that for un-signalized intersections the software tends to overestimate delay measurements for the minor approaches and does not account for gaps in traffic created by the upstream signalized intersections to allow the minor street traffic flow. If the minor approach delays do reach the software estimates, observed behavior shows drivers will find alternate routes. Intersection capacity analysis worksheets are included in Appendix C. Project Location p.9 Exhibit 2 Existing Peak Hour Traffic Volumes SR 856 Ramp 00 AM(00) PM Co l l i n s A v e n u e 189th Street 186th Street Driveway 185th Street Driveway 188th Block A1 A 11 ( 3 0 ) 11 ( 1 2 ) 83 0 ( 1 2 3 8 ) 45 3 ( 1 0 3 4 ) 18 ( 3 6 ) 32 ( 4 2 ) 18 6 2 ( 1 8 8 4 ) 43 (42) 12 4 2 ( 2 2 4 4 ) 0 ( 2 ) 17 ( 3 3 ) 17 9 6 ( 1 8 2 5 ) 1 ( 1 ) 74 ( 8 9 ) 3 (5) 0 (0) 1 (0) 0 (1) 0 (0) 2 (10) 2 ( 7 ) 8 ( 1 6 ) 12 4 2 ( 2 1 9 9 ) 14 ( 1 2 ) 14 ( 6 ) 18 0 5 ( 1 8 3 8 ) 6 ( 6 ) 16 ( 3 1 ) 16 (15) 0 (0) 7 (4) 4 (5) 9 (12) 28 ( 2 3 ) 47 ( 5 5 ) 12 3 7 ( 2 1 3 8 ) 6 ( 3 ) 21 ( 6 ) 17 8 0 ( 1 8 2 2 ) 6 ( 1 1 ) 6 (16) 1 (3) 4 (8) 28 (72) 49 (69) 42 ( 4 6 ) 43 4 ( 1 0 0 2 ) 14 ( 1 7 ) 86 3 ( 7 1 2 ) 13 ( 2 2 ) 5 (8) 18 (15) 291 (492) William Lehman Causeway(SR 856) Driveway DAVID PLUMMER & ASSOCIATES | Project No. 15158 | November 2015 Project Location p.10 Exhibit 3 Existing Lane Configurations SR 856 Ramp W i l l i a m L e h m a n C a u s e w a y W e s t b o u n d R a m p William Lehman Causeway(SR 856) Co l l i n s A v e n u e 189th Street 186th Street Driveway 185th Street Driveway 188th Block Driveway S T O P ST O P ST O P S T O P Co l l i n s A v e n u e No r t h b o u n d A 1 A A1 A DAVID PLUMMER & ASSOCIATES | Project No. 15158 | November 2015 Varadero Traffic Study Page 11 Exhibit 4 Existing Intersection Capacity Analysis Weekday AM and PM Peak Hour Conditions Intersection Signalized/ Unsignalized Direction AM Peak LOS PM Peak LOS Collins Avenue / William Lehman Causeway (SR856) S NB SB EB WB Overall A A D C B B B E D C Collins Avenue / 189th Street S SB EB WB (NBL) Overall A C C A A B C A Collins Avenue / 188th Block U EB WB C D E D Collins Avenue / 186th Street U EB WB F E F F Collins Avenue / 185th Street S NB SB EB WB Overall A A B C A A B C C B Source: David Plummer & Associates Varadero Traffic Study Page 12 3.0 PLANNED AND PROGRAMMED ROADWAY IMPROVEMENTS The 2015 Miami-Dade County Transportation Improvement Program (TIP) and the 2040 Long Range Transportation Program (LRTP) were reviewed to identify any programmed project within the limits of the study area established. There are no capacity improvements identified in either document in this area. Varadero Traffic Study Page 13 4.0 FUTURE TRAFFIC CONDITIONS 4.1 Background Traffic and Committed Developments Historic Average Daily Traffic (ADT) counts published by FDOT were reviewed to determine historic growth in the area. This analysis, provided in Appendix D, indicated that traffic has generally grown at a 0.5% yearly growth rate in this area. The Regalia, Atlantic 15, Porsche Design Tower, Turnberry Ocean Club, Publix, Dezer Office Tower, Palazzo Di Aqualina, and Mansions at Acqualina have recently received city approval in the general area of the project. Traffic associated with these projects was included as committed and was estimated using trip generation rates and/or equations published by the Institute of Transportation Engineers. A summary of the trips associated with these developments is provided in Exhibit 5. Trip generation worksheets are provided in Appendix E. Exhibit 5 Committed Development Trip Generation Development Intensity AM Peak Hour PM Peak Hour In Out Total In Out Total Regalia 40 DUs Condominium 4 21 25 19 9 28 Atlantic 15 15 DUs Single Family Residential 5 15 20 12 7 19 Porsche Design 132 DUs Condominium 11 53 64 51 24 75 Turnberry Ocean Club 154 DUs Condominium 9 43 52 37 22 59 Publix 53,558 SF Supermarket 113 69 182 259 249 508 Dezer Office Tower 132,250 SF Office 10,000 SF Med Office 4,000 SF Bank 257 55 312 97 262 359 Palazzo Di Acqualina 265 DUs Condominium 5,000 SF Quality Restaurant 19 94 113 115 56 171 Mansions at Acqualina 85 DUs Condominium 8 38 46 35 17 52 Source: David Plummer & Associates Varadero Traffic Study Page 14 4.2 Future without Project Intersection Capacity Analysis Future without project turning movement volumes were obtained by applying two years of background growth to existing conditions and adding the traffic associated with committed development. Exhibit 6 shows the resulting LOS for the analyzed intersections. As with existing conditions, the minor approaches and southbound left movements at the Collins Avenue / 186th Street and Collins Avenue / 188th Block intersections continue operating at low levels of service and experiencing some delay. Exhibit 7 shows the projected peak hour turning movements for weekday AM and PM peak hour conditions without project. Intersection capacity worksheets are included in Appendix C. Exhibit 6 Future without Project Intersection LOS Analysis Weekday AM and PM Peak Hour Conditions Intersection Signalized/ Unsignalized Direction AM Peak LOS PM Peak LOS Collins Avenue / William Lehman Causeway (SR856) S NB SB EB WB Overall A A D C B B B E D C Collins Avenue / 189th Street S SB EB WB (NBL) Overall A C C A A C D A Collins Avenue / 188th Block U EB WB C E F E Collins Avenue / 186th Street U EB WB F F F F Collins Avenue / 185th Street S NB SB EB WB Overall A A C C A B B D D B Source: David Plummer & Associates Project Location p.15 Exhibit 7 Future Without Project Peak Hour Traffic Volumes SR 856 Ramp 00 AM(00) PM Co l l i n s A v e n u e 189th Street 186th Street Driveway 185th Street Driveway 188th Block A1 A 14 ( 3 6 ) 11 ( 1 2 ) 10 2 7 ( 1 6 1 6 ) 45 8 ( 1 0 4 4 ) 18 ( 3 6 ) 35 ( 4 9 ) 20 9 2 ( 2 1 9 2 ) 43 (42) 14 3 8 ( 2 6 3 4 ) 0 ( 2 ) 17 ( 3 3 ) 20 3 3 ( 2 1 3 6 ) 9 ( 5 ) 75 ( 9 0 ) 3 (5) 0 (0) 1 (0) 0 (1) 0 (0) 2 (10) 2 ( 7 ) 33 ( 4 0 ) 14 5 9 ( 2 5 9 8 ) 14 ( 1 2 ) 14 ( 6 ) 20 6 3 ( 2 1 5 9 ) 6 ( 6 ) 16 ( 3 1 ) 16 (15) 0 (0) 7 (4) 4 (5) 15 (25) 28 ( 2 3 ) 47 ( 5 6 ) 13 9 3 ( 2 5 5 8 ) 6 ( 3 ) 21 ( 6 ) 20 5 5 ( 2 1 2 3 ) 11 ( 3 0 ) 6 (16) 1 (3) 4 (8) 28 (73) 49 (70) 43 ( 4 9 ) 51 9 ( 1 1 4 6 ) 14 ( 1 7 ) 96 4 ( 9 7 3 ) 13 ( 2 2 ) 5 (8) 18 (15) 294 (497) William Lehman Causeway(SR 856) Driveway DAVID PLUMMER & ASSOCIATES | Project No. 15158 | November 2015 Varadero Traffic Study Page 16 4.3 Project Trip Generation Trip generation for the proposed project was estimated using the Institute of Transportation Engineers (ITE) Trip Generation, 9th Edition. This manual provides gross trip generation rates and/or equations by land use type. These rates and equations estimate vehicle trip ends at a free- standing site’s driveways. The project trip generation summary is provided in Exhibit 8. The ITE trip generation worksheet is provided in Appendix F. Exhibit 8 Project Trip Generation Summary Proposed ITE Land Use Designation1 Size/Units AM Peak Hour Vehicle Trips PM Peak Hour Vehicle Trips In Out Total In Out Total High Rise Residential Condominium (Land Use 232) 431 DU 29 125 154 100 62 162 Residential Condominium (Land Use 230) 90 DU 8 39 47 37 18 55 Hotel (Land Use 310) 60 Rooms 19 13 32 19 17 36 Drinking Place (Land Use 925) 1,177 SF 0 0 0 9 4 13 Quality Restaurant (Land Use 931) 4,776 SF 0 0 0 24 12 36 Health / Fitness Club (Land Use 492) 4,847 SF 3 4 7 10 7 17 General Office (Land Use 710) 2,161 SF 3 0 3 1 2 3 Subtotal Gross Trips 62 181 243 200 122 322 Transit / Pedestrian 10% -5 -18 -23 -20 -12 -32 Internalization2 AM 1.8% PM 17.9% -2 -2 -4 -26 -26 -52 Pass-By Trips (Restaurant Only) 2 PM 44% 0 0 0 -11 -5 -16 Net External Trips (Proposed) 55 161 216 143 79 222 Varadero Traffic Study Page 17 Exhibit 8 (continued) Project Trip Generation Summary Existing ITE Land Use Designation1 Size/Units AM Peak Hour Vehicle Trips PM Peak Hour Vehicle Trips In Out Total In Out Total Hotel (Land Use 310) 244 DU 76 53 129 76 70 146 Residential Condominium (Land Use 230) 105 DU 9 45 54 42 21 63 Subtotal Gross Trips 85 98 183 118 91 209 Transit / Pedestrian 10% -8 -10 -18 -12 -9 -21 Net External Trips (Existing) 77 88 165 106 82 188 Proposed Uses 55 161 216 144 78 222 Existing Uses -77 -88 -165 -106 -82 -188 Net New External Trips -22 73 51 38 -4 34 1 Based on ITE Trip Generation Manual, Ninth Edition, 2 Based on ITE Trip Generation Manual User’s Guide and Handbook, Ninth Edition, Varadero Traffic Study Page 18 4.4 Project Trip Assignment Project traffic was distributed and assigned to the study area using the Cardinal Distribution for TAZ 587 shown in Exhibit 9. The Cardinal Distribution gives a generalized distribution of trips from a TAZ to other parts of Miami-Dade County. For estimating trip distribution for the project traffic, consideration was given to conditions such as the roadway network accessed by the project traffic, roadways available to travel in the desired direction, and attractiveness of traveling on a specific roadway. The project trip distribution is graphically portrayed in Exhibits 10. Exhibit 9 Cardinal Distribution (TAZ 587) Direction Distribution NNE 7.66% ENE 4.47% ESE 0.05% SSE 1.54% SSW 3.90% WSW 24.98% WNW 32.64% NNW 24.74% Total 100.00% Source: Miami- Dade Long Range Transportation Plan Project Location OutboundInbound p.19 Exhibit 10 Project Trip Distribution SR 856 Ramp Co l l i n s A v e n u e 189th Street 186th Street Driveway 185th Street Driveway 188th Block A1 A 25 % 50 % 50 % 25 % 2 5 % 25 % 50 % 50 % 50 % 25% 10 % 40 % 25 % 25 % 40 % 10 % 20 % 10% 40% 50% William Lehman Causeway(SR 856) Driveway DAVID PLUMMER & ASSOCIATES | Project No. 15158 | November 2015 Varadero Traffic Study Page 20 4.5 Future with Project Intersection Capacity Analysis Future background traffic and traffic projections for the project were combined to obtain future traffic with project at the analyzed intersections. Exhibit 11 shows the projected turning movement volumes. Exhibit 12 shows the resulting LOS for the weekday AM and PM peak hour conditions for future with the project. The analysis of future with project conditions show that the overall operations of all the intersections analyzed will operate within the City’s LOS standards. As with existing and future without project conditions, the minor approaches and southbound left movement at the Collins Avenue / 186th Street and Collins Avenue / 188th Block intersections are projected to operate at low levels of service and experiencing some delay. As previously mentioned, this is due to the fact that for un-signalized intersections the software tends to overestimate delay measurements for the minor approaches and does not account for gaps in traffic created by the upstream signalized intersections to allow the minor street traffic flow. If the minor approach delays do reach the software estimates, observed behavior shows drivers will find alternate routes. Intersection capacity analysis worksheets are included in Appendix C. Project Location p.21 Exhibit 11 Future With Project Peak Hour Traffic Volumes SR 856 Ramp 00 AM(00) PM Co l l i n s A v e n u e 189th Street 186th Street Driveway 185th Street Driveway 188th Block A1 A 5 ( 2 8 ) 11 ( 1 2 ) 10 4 1 ( 1 6 1 1 ) 48 0 ( 1 0 4 7 ) 18 ( 3 6 ) 35 ( 4 9 ) 20 8 1 ( 2 2 1 1 ) 43 (42) 14 0 5 ( 2 5 9 6 ) 22 ( 6 0 ) 17 ( 3 3 ) 20 1 6 ( 2 1 2 0 ) 31 ( 6 2 ) 42 ( 5 1 ) 75 (36) 0 (0) 39 (7) 0 (1) 0 (0) 2 (10) 2 ( 7 ) 33 ( 4 0 ) 14 4 8 ( 2 6 1 7 ) 14 ( 1 2 ) 14 ( 6 ) 21 0 0 ( 2 1 5 7 ) 6 ( 6 ) 16 ( 3 1 ) 16 (15) 0 (0) 7 (4) 4 (5) 15 (25) 28 ( 2 3 ) 47 ( 5 6 ) 13 8 2 ( 2 5 7 7 ) 6 ( 3 ) 21 ( 6 ) 20 9 2 ( 2 1 2 1 ) 11 ( 3 0 ) 6 (16) 1 (3) 4 (8) 28 (73) 49 (70) 43 ( 4 9 ) 54 1 ( 1 1 4 9 ) 14 ( 1 7 ) 96 3 ( 9 8 7 ) 13 ( 2 2 ) 5 (8) 18 (15) 294 (497) William Lehman Causeway(SR 856) Driveway DAVID PLUMMER & ASSOCIATES | Project No. 15158 | November 2015 Varadero Traffic Study Page 22 Exhibit 12 Future with Project Intersection Capacity Analysis Weekday AM and PM Peak Hour Conditions Intersection Signalized/ Unsignalized Direction AM Peak LOS PM Peak LOS LOS Standard Collins Avenue / William Lehman Causeway (SR856) S NB SB EB WB Overall A A D C B B B E D C E+20 E+20 E E N/A Collins Avenue / 189th Street S SB EB WB Overall A C B A A D C A E+20 E+20 E E N/A Collins Avenue / 188th Block / South Project Driveway U EB WB C F F F N/A N/A Collins Avenue / 186th Street U EB WB F F F F E N/A Collins Avenue / 185th Street S NB SB EB WB Overall A A C C A B B D D B E+20 E+20 E N/A N/A Collins Avenue / North Project Driveway U WB B B N/A Source: David Plummer & Associates Varadero Traffic Study Page 23 5.0 QUEUING ANALYSIS 5.1 Valet Drop-Off/ Pick-Up Area The queuing analysis was performed based on the methodology outlined in the Institute of Transportation Engineers (ITE) Transportation and Land Development. The analysis was performed to determine the number of valet parking attendants required during the peak period of a regular weekday so that the queue does not extend past the entrance (95% confidence level analysis). The potential queue at the drop-off area of the valet operations was calculated based on the peak hour traffic published by the Institute of Transportation Engineers (ITE) trip generation rates and/or equations for the proposed development plan. Three separate valet drop-off / pick-up stations will be located at each proposed residential lobby and at the hotel lobby. Project trips were distributed based on the number of unit assigned to each drop-off / pick-up area. Exhibit 13 provides the total project trip generation for each drop-off / pick-up area during the weekday PM peak hour conditions (worst case scenario). Exhibit 13 Varadero Trip Generation - PM Peak Hour Drop-off / Pick-up Area Station # ITE Land Use Designation ITE Land Use Code Number of Units PM Peak Hour Vehicle Trips In Out Total 1 High Rise Residential Condominium LU 232 137 DUs 32 20 52 1 Health / Fitness Club LU 492 4,847 SF 10 7 17 2 Hotel LU 310 60 Rooms 19 17 36 2 Drinking Place LU 925 1,177 SF 9 4 13 2 Quality Restaurant LU 931 4,776 SF 24 12 36 2 Residential Condominium LU 230 90 DUs 37 18 55 3 High Rise Residential Condominium LU 232 294 DUs 68 42 110 3 General Office LU 710 2,161 SF 1 2 3 Gross Trips (Proposed) 200 122 322 Source: ITE Trip Generation Manual, 9th Edition Varadero Traffic Study Page 24 The queuing analysis for each tower used the single-channel waiting line model with Poisson arrivals and exponential service times. The analysis is based on the coefficient of utilization (ρ) which is the ratio of the average arrival rate of vehicles to the average service rate. = The average service rate corresponds to the time it will take a valet parking attendant to park or retrieve a vehicle. If the coefficient of utilization is greater than 1, then the calculation will yield an infinite queue length. The required queue storage (M) is determined using the following equation: = ln > − ln ln − 1 In this equation, P(x > M) is set at 5% to yield a 95% confidence that the queue will not back-up onto the adjacent street. Parking for the development will be all valet except for 85 assigned residential parking spaces that will be self parking. The self parking represents 11% of the parking spaces provided for the residential component therefore a deduction was taken to account for the project trips (residential only) not using valet. An overall 10% deduction was applied to account for transit/ pedestrian trips. Valet will use tandem, double mechanical, and triple mechanical parking located on the basement level. Since the driving distance differs for valet for inbound/outbound access, a weighted average of the inbound and outbound driving time was used. The weighted average was based on the trip generation in/out distribution, which was 62% IN and 38% OUT. Varadero Traffic Study Page 25 The processing rate was calculated by adding the time it will take a valet attendant to process the vehicles (processing time), the time it will take him to drive to the parking space (driving time) the time it will take him to maneuver stacked vehicles and mechanical lift in order to park or retrieve a vehicle (mechanical lift time and park processing time), and the time it will take him to walk to/from the parking area (walking time). A processing time of 51 seconds per vehicle was used in the analysis. This information is based on data collected on a hotel in Miami Beach (see Appendix G). The driving time for the valet attendant was calculated on a conservative speed of 10 mph, and the walking time for the valet attendant was calculated on a jogging speed of 6ft/sec. The mechanical lift time has a process time of 30 seconds per platform lift. This timing was tripled to assume that every vehicle would need to wait for the lift to come from the most suspended position in order to load. The calculations for the Station 1 are presented in Exhibit 14. Exhibit 14 Station 1- Residential Lobby Valet Processing Rate Inbound Valet Time Processing time: 51 sec / 60 sec / 1 min = 0.85 min Driving time (most distant space): 1068 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.21 min Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min Park Processing Time: 0.50 min Walking time: 487ft/6 ft/sec / 60 sec/min = 1.35 min Total = 5.41 min Outbound Valet Time Processing time: 51 sec / 60 sec / 1 min = 0.85 min Driving time (most distant space): 1121 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.27 min Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min Park Processing Time: 0.75 min Walking time: 487ft/6 ft/sec / 60 sec/min = 1.35 min Total = 5.72 min Varadero Traffic Study Page 26 Weighted Valet Time 62% Inbound Valet parking: 0.62 * 5.41 min = 3.35 min 38% Outbound Valet parking: 0.38 * 5.72 min = 2.17 min Total = 5.52 min An iterative approach was used to determine the minimum number of valet attendants required during the PM peak hour to serve the entering and exiting vehicles that will ensure that the average valet queue will not extend past the drop-off / pick-up area at Station 1. Exhibit 14A shows the calculations for Station 1. Exhibit 14A Varadero - Station 1 Queue Calculations Q = Processing rate = !" #$%/'().)+#$%/,(-./00 = 10.87 4 5 66/ℎ q = Demand Rate = 56 :/''( N = Service Positions = 6 attendants ρ = Utilization factor = ; <= =)! :/'/'(!×?".@A ,(-./00/'(= 0.8586 Qm = Table Value = 0.6482 M = queue length which is exceeded 5% of the time [P(x>M)] =BCD EF GBC =H BC ρ − 1 = BC ".") GBC ".!I@+ BC ".@)@! − 1 = 15.82, 6 L 16 vehicles The results of the analysis show that 6 valet attendants would be able to handle the demand during PM peak hour with an average queue of approximately 16 vehicles or less. The proposed site drop-off / pick-up Station 1 can accommodate approximately 18 vehicles in queue. The site plan is included in Appendix G. Varadero Traffic Study Page 27 The calculations for Station 2 are presented in Exhibit 15. Exhibit 15 Station 2 –Hotel Lobby Valet Processing Rate Inbound Valet Time Processing time: 51 sec / 60 sec / 1 min = 0.85 min Driving time (most distant space): 1397 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.58 min Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min Park Processing Time: 0.50 min Walking time: 670ft/6 ft/sec / 60 sec/min = 1.86 min Total = 6.29 min Outbound Valet Time Processing time: 51 sec / 60 sec / 1 min = 0.85 min Driving time (most distant space): 1621 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.84 min Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min Park Processing Time: 0.75 min Walking time: 670ft/6 ft/sec / 60 sec/min = 1.86 min Total = 6.80 min Weighted Valet Time 62% Inbound Valet parking: 0.62 * 6.29 min = 3.90 min 38% Outbound Valet parking: 0.38 * 6.80 min = 2.58 min Total = 6.48 min An iterative approach was used to determine the minimum number of valet attendants required during the PM peak hour to serve the entering and exiting vehicles that will ensure that the average valet queue will not extend past the drop-off / pick-up area at Station 2. Exhibit 15A shows the calculations for Station 2. Varadero Traffic Study Page 28 Exhibit 15A Varadero – Station 2 Queue Calculations Q = Processing rate = !" #$%/'(!.I@ #$%/,(-./00 = 9.26 4 5 66/ℎ q = Demand Rate = 126 :/''( N = Service Positions = 15 attendants ρ = Utilization factor = ; <= =?+! :/'/'(?)×N.+! ,(-./00/'(= 0.9072 Qm = Table Value = 0.6312 M = queue length which is exceeded 5% of the time [P(x>M)] =BCD EF GBC =H BC ρ − 1 = BC ".") GBC ".!O?+ BC ".N"A+ − 1 = 25.03 6 L 25 Vehicles The results of the analysis show that 15 valet attendants would be able to handle the demand during PM peak hour with an average queue of approximately 25 vehicles or less. The proposed site drop-off / pick-up Station 2 can accommodate approximately 27 vehicles in queue. The site plan is included in Appendix G. Varadero Traffic Study Page 29 The calculations for Station 3 are presented in Exhibit 16. Exhibit 16 Station 3 – Residential Lobby Valet Processing Rate Inbound Valet Time Processing time: 51 sec / 60 sec / 1 min = 0.85 min Driving time (most distant space): 1486 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.68 min Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min Park Processing Time: 0.50 min Walking time: 515ft/6 ft/sec / 60 sec/min = 1.43 min Total = 5.96 min Outbound Valet Time Processing time: 51 sec / 60 sec / 1 min = 0.85 min Driving time (most distant space): 1643 ft * 1 mile/5280 ft * 1hr/10 miles * 60 min/hr =1.86 min Mechanical Lift Processing Time: 30 sec/lift * 3 lift * 1 min/60 sec = 1.50 min Park Processing Time: 0.75 min Walking time: 515ft/6 ft/sec / 60 sec/min = 1.43 min Total = 6.39 min Weighted Valet Time 62% Inbound Valet parking: 0.62 * 5.96 min = 3.69 min 38% Outbound Valet parking: 0.38 * 6.39 min = 2.43 min Total = 6.12 min An iterative approach was used to determine the minimum number of valet attendants required during the PM peak hour to serve the entering and exiting vehicles that will ensure that the average valet queue will not extend past the drop-off / pick-up area at Station 3. Exhibit 16A shows the calculations for Station 3. Varadero Traffic Study Page 30 Exhibit 16A Varadero – Station 3 Queue Calculations Q = Processing rate = !" #$%/'(!.?+ #$%/,(-./00 = 9.80 4 5 66/ℎ q = Demand Rate = 90 :/''( N = Service Positions = 12 attendants ρ = Utilization factor = ; <= =N" :/'/'(?+×N.@" ,(-./00/'(= 0.7650 Qm = Table Value = 0.3041 M = queue length which is exceeded 5% of the time [P(x>M)] =BCD EF GBC =H BC ρ − 1 = BC ".") GBC ".O"I? BC ".A!)" − 1 = 5.74 6 L 6 Vehicle The results of the analysis show that 12 valet attendants would be able to handle the demand during PM peak hour with an average queue of approximately 6 vehicles or less. The proposed site drop-off / pick-up Station 3 can accommodate approximately 6 vehicles in queue. The site plan is included in Appendix G. Varadero Traffic Study Page 31 6.0 CONCLUSIONS An assessment of the traffic impacts associated with the Varadero project was performed. All of the analyzed intersections currently operate, and will continue to operate within the City’s adopted LOS standards. As with existing and future without project conditions, the minor approaches and southbound left movement at the Collins Avenue / 186th Street and Collins Avenue / 188th Block intersections are projected to operate at low levels of service and experiencing some delay. As previously mentioned, this is due to the fact that for un-signalized intersections the software tends to overestimate delay measurements for the minor approaches and does not account for gaps in traffic created by the upstream signalized intersections to allow the minor street traffic flow. If the minor approach delays do reach the software estimates, observed behavior shows drivers will find alternate routes. An assessment of circulation as it relates to the valet services during the PM peak hour was performed. The queuing analysis shows that the anticipated queue at the designated valet drop-off / pick-up areas during the typical PM peak traffic conditions can be accommodated within the project site at each of the three proposed stations. Appendix A Site Plan Collins Ave+6' 0" NGVD + 8 ' 9 " N G V D 5'-0" s f E m p l o y e e F a c i l i t i e s 3 1 7 4 G F A s f T o i l e t s 4 3 8 G F A s f L i f t L o b b y 5 9 1 G F A s f C h i l d r e n E n t e r t a i n m e n t 1 8 5 3 G F A s f C o r r i d o r 2 7 0 G F A s f P o o l L o u n g e 2 0 2 8 G F A s f 3 - M e a l R e s t a u r a n t 3 5 6 4 G F A s f T o i l e t s 4 5 5 G F A s f L i f t L o b b y 6 4 1 G F A s f L i f t L o b b y 2 0 7 1 G F A s f C i r u l a t i o n 3 3 1 G F A s f C o r r i d o r 6 8 2 G F A s f T o i l e t s 5 3 8 G F A s f C h i l d r e n E n t e r t a i n m e n t 1 7 3 3 G F A s f P o o l L o u n g e 1 9 6 5 G F A s f L i f t L o b b y 9 1 8 G F A s f C i r c u l a t i o n 2 5 7 G F A s f B O H 2 3 8 6 G F A s f C i r u l a t i o n 2 1 9 G F A s f C o r r i d o r 5 4 2 G F A s f C o r r i d o r 1 2 8 4 G F A s f C o r r i d o r 4 9 5 G F A s f C o r r i d o r 2 9 2 G F A s f C i r u l a t i o n 1 0 2 4 G F A s f F i r e L . 1 6 0 n o n - G F A s f F i r e P u m p R o o m 6 7 1 n o n - G F A s f T e c h 2 1 3 7 n o n - G F A s f F i r e L . 1 5 2 n o n - G F A s f S t o r a g e 9 6 G F A s f T V / P h o n e 5 0 1 n o n - G F A s f D o m e s t i c P u m p 3 9 6 n o n - G F A s f S w i t c h G e a r R o o m 5 5 9 n o n - G F A s f F P L V a u l t 5 0 1 n o n - G F A s f F i r e P u m p R o o m 4 3 0 n o n - G F A s f S t o r a g e 1 2 0 n o n - G F A sf Generator Room 2385non-GFAsfGenerator Room 1409non-GFAsfSwitch Gear Room568non-GFAsfFPL Vault755non-GFA sf Fuel Tank361non-GFA sf Domestic Pump Room359non-GFA s f F i r e L . 1 6 0 n o n - G F A s f P a r k i n g 3 6 4 6 0 n o n - G F A E L . E L . S . E L . S T R . U P D N E L . E L . S . E L . E L . S . E L . E L . H . E L . H . E L . H . E L . E L . E L . E L . S . E L . E L . E L . D N D N U P U P S T R . S T R . L1 ParkingEntrance10'-0"Ramp 14%7% blend7% blend UPUPR15'-0"UP Ramp 14%Level 1ELEV. +15'-8"Level 1ELEV. +15'-8" L e v e l 1 E L E V . + 1 5 ' - 8 " Level 1ELEV. +15'-8" L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " 8 ' - 7 " 9 ' - 0 " 8 ' - 9 " 8 ' - 1 " 7 ' - 7 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " 6'-0"6'-0"6'-0"7% blend 7% blendRamp 14%DN L e g e n d p a r k i n g s p a c e s 1 = S i n g l e p a r k i n g s p a c e 2 = S i n g l e m e c h a n i c a l p a r k i n g s p a c e T 1 = T a n d e m p a r k i n g s p a c e s T 2 = T a n d e m m e c h a n i c a l p a r k i n g s p a c e s 36'-0"24'-0" 1 8 ' - 0 " 18'-0"24'-0" 1 8 ' - 0 " 3 6 ' - 0 " 2 4 ' - 0 " L1 ParkingEntrance 5 ' - 0 " 5 ' - 0 " 18'-5" L e v e l 1 E L E V . + 1 5 ' - 8 " C h a m f e r E L E V . + 1 2 ' - 0 " 87'-10" a r e a t h i c k n e s s o f d e c k c o n s t r u c t i o n m a x . 2 ' 8 " t o t a l , i n c l u d i n g f i n i s h e s , a l s o s e e s e c t i o n s S K 1 - 0 2 0 . 10'-0"DN UPRamp 14%7% blend 10'-0"10'-0"10'-0"Ramp Beach Easement1:20 Slope D N L e v e l 1 E L E V . + 1 5 ' - 8 " UPGradeELEV. +6'-0" D N UP C h a m f e r E L E V . + 1 2 ' - 0 " Ramp1:20 SlopeDNUP31'-0" 25'-0" 5'-6" C h a m f e r E L E V . + 1 2 ' - 0 " C h a m f e r E L E V . + 1 2 ' - 0 " B e a c h E a s e m e n t Ramp Lenght 193'-4"Ramp Length 120'-0" 19'-6"5'-6" D N R a m p 1 6 % 8 % b l e n d DNRamp8% L 1 L 2 L 2 L 1 L 1 L 2 19'-6" beach easement min.20'-0" beach easementmin.20'-0" beach easement min.20'-0" 1 8 ' - 0 " 5 ' - 0 " 10'-0" D A D E C O U N T Y B U L K H E A D L I N E P L A T B O O K 7 4 P A G E 1 Tower Setback50' Porte Cochere 4 7 ' - 0 " O F F S E T F R O M E C L L I N E B U L K H E A D L I N E 4 7 ' - 0 " O F F S E T F R O M E C L L I N E FOUND NAIL & DISKLB3653 (3/24/15) P h a s e 1 l i n e a l l o w i n g 3 0 0 ' w i d t h f o r p h a s e 1 2 5 ' - 0 " 2 1 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 2 ' - 3 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 2 5 ' - 0 " 31'-4"31'-4"31'-4"31'-4" 3 1 ' - 4 " 1 3 ' - 8 " 3 1 ' - 4 " 3 1 ' - 4 " 3 1 ' - 4 " 3 1 ' - 4 " 75'-0" 1 3 - 0 0 2 1 4 P O N M L K J I H G F E D C B A 1 3 1 2 1 1 9 7 6 54323.11.1 1 3 . 1 1 4 . 1 1 5 . 1 13-002 1 3-001 1 3-001 1 0 1 1 3 ' - 8 " 31'-4" 8 1 6 ' - 8 " 3 2 ' - 1 " 3 1 ' - 4 " 1.2 10'-0"2.1 32'-1"1 T1 1T1T1T1T1T1T1T1T1T1T1T1T1T1T1T1T1T1 T 1 T 1 T 1 T 1 1 1111 1 1 1 1 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 T 1 1 T 1 T 1 d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 K u r t D a n n w o l f F L . A r c h i t e c t R e g . N o : A R 9 2 0 4 2 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t S c h i e h a v e n 1 3 m 3 0 2 4 E C R o t t e r d a m T h e N e t h e r l a n d s c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J P G E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 3 1 ( 0 ) 1 0 4 8 5 5 8 0 1 c l i e n t 1 - 0 0 1 B A C K G R O U N D 0 9 / 1 4 / 2 0 1 5 Appendix B Traffic Data Collection DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 5 t h S t r e e t C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : Wednesday TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n L T R TO T A L L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 07 : 0 0 A M 0 7 : 1 5 A M 1 1 6 1 5 5 1 1 7 3 2 3 0 4 1 0 3 1 6 5 2 6 1 3 0 0 0 0 5 0 2 07 : 1 5 A M 0 7 : 3 0 A M 0 9 1 9 4 1 2 0 4 0 3 5 2 5 3 5 7 4 0 8 1 2 1 0 2 3 5 7 6 07 : 3 0 A M 0 7 : 4 5 A M 3 7 2 5 5 1 2 6 6 3 3 8 4 5 3 9 2 9 1 9 1 9 0 1 0 1 6 7 8 07 : 4 5 A M 0 8 : 0 0 A M 6 1 2 2 7 0 1 2 8 9 1 5 1 5 5 5 2 1 7 0 9 1 6 3 0 2 5 8 3 1 08 : 0 0 A M 0 8 : 1 5 A M 11 1 4 3 3 6 3 3 6 4 5 4 5 9 5 4 6 9 6 0 1 7 2 3 0 0 0 0 8 5 6 08 : 1 5 A M 0 8 : 3 0 A M 27 8 3 9 5 0 4 3 0 1 4 9 4 4 4 9 9 7 0 2 2 2 9 2 0 1 3 9 6 1 08 : 3 0 A M 0 8 : 4 5 A M 2 1 6 4 1 2 2 4 3 2 0 4 5 2 3 4 5 5 9 0 1 5 2 4 2 0 0 2 9 1 3 08 : 4 5 A M 0 9 : 0 0 A M 4 1 0 3 8 5 2 4 0 1 0 4 9 7 3 5 0 0 8 3 1 0 2 1 0 0 6 6 9 2 8 AM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 5 t h S t r e e t TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n L T R T O T A L L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 07 : 0 0 A M 0 9 : 0 0 A M 28 4 7 1 2 3 7 6 1 3 1 8 6 1 7 8 0 2 1 1 8 0 7 2 8 3 4 9 8 1 4 1 6 1 0 3 , 2 1 6 PE A K H O U R F A C T O R 0. 9 4 0 . 9 6 0 . 8 4 0 . 4 6 0 . 9 5 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Co l l i n s A v e n u e 18 5 t h S t r e e t Collins Ave _185th Street_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 5 t h S t r e e t C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n L T R TO T A L L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 04 : 0 0 P M 0 4 : 1 5 P M 2 7 4 5 1 1 4 6 1 3 4 2 2 1 4 2 6 1 6 0 1 4 3 0 1 4 5 1 0 9 2 7 04 : 1 5 P M 0 4 : 3 0 P M 5 1 4 4 6 6 2 4 8 7 5 4 2 2 2 4 2 9 2 7 0 1 5 4 2 0 0 3 3 9 6 1 04 : 3 0 P M 0 4 : 4 5 P M 9 1 9 6 2 0 1 6 4 9 2 4 1 8 0 4 2 0 1 2 0 1 4 2 6 4 0 4 8 1 , 1 0 3 04 : 4 5 P M 0 5 : 0 0 P M 5 1 1 5 6 3 0 5 7 9 3 4 5 6 2 4 6 1 1 6 0 1 2 2 8 5 0 6 1 1 1 , 0 7 9 05 : 0 0 P M 0 5 : 1 5 P M 5 1 4 5 1 0 0 5 2 9 4 4 9 1 4 4 9 9 1 4 0 2 0 3 4 2 0 5 7 1 , 0 6 9 05 : 1 5 P M 0 5 : 3 0 P M 9 1 4 5 5 5 0 5 7 8 1 4 3 8 1 4 4 0 8 1 1 7 2 6 3 0 2 5 1 , 0 4 9 05 : 3 0 P M 0 5 : 4 5 P M 6 1 5 5 1 2 0 5 3 3 1 4 5 7 1 4 5 9 2 8 1 2 2 5 1 1 1 3 5 1 , 0 4 8 05 : 4 5 P M 0 6 : 0 0 P M 3 1 3 4 7 4 2 4 9 2 3 4 3 4 1 4 3 8 1 8 0 2 0 3 8 0 0 3 3 9 7 1 PM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 5 t h S t r e e t TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n L T R T O T A L L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 04 : 0 0 P M 0 6 : 0 0 P M 23 5 5 2 1 3 8 3 2 2 1 9 1 1 1 8 2 2 6 1 8 4 0 7 2 1 6 9 1 4 2 8 3 1 6 2 7 4 , 2 2 7 PE A K H O U R F A C T O R 0. 9 0 0 . 9 1 0 . 8 4 0 . 7 0 0 . 9 7 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Wednesday Co l l i n s A v e n u e 18 5 t h S t r e e t Collins Ave _185th Street_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 6 t h S t r e e t C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : Wednesday TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n L T R TO T A L U- t u r n L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 07 : 0 0 A M 0 7 : 1 5 A M 0 1 1 5 2 4 1 5 7 2 1 3 2 7 1 3 3 1 0 0 2 2 0 0 3 3 4 9 3 07 : 1 5 A M 0 7 : 3 0 A M 1 1 1 9 2 1 1 9 5 3 0 3 3 9 0 3 4 2 0 0 2 2 2 0 0 2 5 4 1 07 : 3 0 A M 0 7 : 4 5 A M 0 1 2 4 6 0 2 4 7 2 0 4 1 0 5 4 1 7 1 0 1 2 3 0 1 4 6 7 0 07 : 4 5 A M 0 8 : 0 0 A M 0 0 2 8 8 5 2 9 3 4 3 5 0 2 3 5 1 2 2 0 3 5 1 0 4 5 8 1 5 08 : 0 0 A M 0 8 : 1 5 A M 1 3 3 2 3 5 3 3 2 1 1 5 0 2 6 5 1 0 1 0 2 3 3 0 5 8 8 5 3 08 : 1 5 A M 0 8 : 3 0 A M 1 3 3 9 8 4 4 0 6 8 1 4 9 0 3 5 0 2 1 0 3 4 3 0 5 8 9 2 0 08 : 3 0 A M 0 8 : 4 5 A M 0 4 4 0 2 6 4 1 2 9 2 4 5 7 6 4 7 4 0 0 1 1 2 0 4 6 8 9 3 08 : 4 5 A M 0 9 : 0 0 A M 1 3 4 1 0 3 4 1 7 2 4 4 7 7 3 4 8 6 2 0 4 6 0 0 9 9 9 1 8 AM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 6 t h S t r e e t TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n L T R T O T A L U- t u r n L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 07 : 0 0 A M 0 9 : 0 0 A M 2 8 1 2 4 2 1 4 1 2 6 6 1 6 6 1 8 0 5 1 4 1 8 4 1 4 0 9 1 3 7 0 1 6 2 3 3 , 1 4 3 PE A K H O U R F A C T O R 0. 9 4 0. 9 7 0 . 5 8 0 . 8 6 0 . 9 7 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Co l l i n s A v e n u e 18 6 t h S t r e e t Collins Ave _186th Street_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 6 t h S t r e e t C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n L T R TO T A L U- t u r n L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 04 : 0 0 P M 0 4 : 1 5 P M 0 3 4 7 1 2 4 7 6 9 2 4 2 0 0 4 3 1 2 0 3 5 2 0 4 6 9 1 8 04 : 1 5 P M 0 4 : 3 0 P M 1 3 4 9 2 1 4 9 7 5 0 4 4 8 1 4 5 4 1 0 1 2 0 0 6 6 9 5 9 04 : 3 0 P M 0 4 : 4 5 P M 2 2 6 3 1 3 6 3 8 7 0 4 0 4 1 4 1 2 0 0 0 0 0 0 5 5 1 , 0 5 5 04 : 4 5 P M 0 5 : 0 0 P M 3 4 5 7 3 4 5 8 4 1 1 3 4 6 5 2 4 8 1 1 0 2 3 0 0 2 2 1 , 0 7 0 05 : 0 0 P M 0 5 : 1 5 P M 4 8 5 2 5 2 5 3 9 6 2 4 9 3 1 5 0 2 3 0 4 7 2 0 2 4 1 , 0 5 2 05 : 1 5 P M 0 5 : 3 0 P M 3 4 5 4 6 7 5 6 0 8 1 4 3 7 2 4 4 8 1 0 9 1 0 1 0 1 2 1 , 0 2 0 05 : 3 0 P M 0 5 : 4 5 P M 0 5 5 3 7 0 5 4 2 7 3 4 7 1 3 4 8 4 1 0 1 2 3 0 6 9 1 , 0 3 7 05 : 4 5 P M 0 6 : 0 0 P M 1 2 4 9 4 5 5 0 2 7 1 4 3 1 2 4 4 1 1 0 3 4 0 0 4 4 9 5 1 PM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 6 t h S t r e e t TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n L T R T O T A L U- t u r n L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 04 : 0 0 P M 0 6 : 0 0 P M 7 1 6 2 1 9 9 1 2 2 2 3 4 3 1 6 1 8 3 8 6 1 8 8 1 5 0 1 2 1 7 4 0 1 5 2 0 4 , 1 5 2 PE A K H O U R F A C T O R 0. 9 1 0. 9 2 0 . 5 0 0 . 6 5 0 . 9 8 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Wednesday Co l l i n s A v e n u e 18 6 t h S t r e e t Collins Ave _186th Street_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 8 t h B l o c k C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : Wednesday TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L L T R TO T A L U- t u r n L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 07 : 0 0 A M 0 7 : 1 5 A M 1 1 5 7 0 1 5 8 1 3 0 3 2 7 1 3 4 1 0 0 0 0 0 0 1 1 5 0 0 07 : 1 5 A M 0 7 : 3 0 A M 0 1 9 2 0 1 9 2 1 2 0 3 3 5 4 3 5 1 0 0 1 1 0 0 0 0 5 4 4 07 : 3 0 A M 0 7 : 4 5 A M 0 2 5 1 0 2 5 1 1 5 0 4 1 9 2 4 3 6 0 0 0 0 1 0 3 4 6 9 1 07 : 4 5 A M 0 8 : 0 0 A M 0 2 9 0 0 2 9 0 1 7 1 4 8 8 3 5 0 9 0 0 0 0 0 0 0 0 7 9 9 08 : 0 0 A M 0 8 : 1 5 A M 0 3 2 4 0 3 2 4 2 4 0 5 1 8 6 5 4 8 0 0 0 0 0 0 0 0 8 7 2 08 : 1 5 A M 0 8 : 3 0 A M 0 3 8 9 0 3 8 9 2 3 0 4 8 1 5 5 0 9 0 0 3 3 0 0 1 1 9 0 2 08 : 3 0 A M 0 8 : 4 5 A M 0 4 0 8 0 4 0 8 1 4 0 4 4 7 5 4 6 6 0 0 0 0 0 0 0 0 8 7 4 08 : 4 5 A M 0 9 : 0 0 A M 0 4 0 1 0 4 0 1 2 6 0 4 7 2 7 5 0 5 0 0 0 0 1 0 0 1 9 0 7 AM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 8 t h B l o c k TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L L T R T O T A L U- t u r n L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 07 : 0 0 A M 0 9 : 0 0 A M 1 1 2 4 2 0 1 2 4 3 7 4 1 1 7 9 6 1 7 1 8 8 7 0 0 2 2 1 0 3 4 3 , 1 3 6 PE A K H O U R F A C T O R 0. 9 3 0. 9 3 0 . 2 5 0 . 5 0 0 . 9 8 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Co l l i n s A v e n u e 18 8 t h B l o c k Collins Ave _188th Block_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 8 t h B l o c k C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L L T R TO T A L U- t u r n L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 04 : 0 0 P M 0 4 : 1 5 P M 0 4 7 9 0 4 7 9 2 5 0 4 1 7 6 4 4 8 0 0 1 1 0 0 1 1 9 2 9 04 : 1 5 P M 0 4 : 3 0 P M 2 5 1 1 0 5 1 3 2 7 0 4 4 7 5 4 7 9 1 0 0 1 0 0 0 0 9 9 3 04 : 3 0 P M 0 4 : 4 5 P M 0 6 3 3 1 6 3 4 2 1 0 4 0 2 9 4 3 2 0 0 2 2 0 0 1 1 1 , 0 6 9 04 : 4 5 P M 0 5 : 0 0 P M 0 5 7 6 1 5 7 7 2 0 1 4 7 0 5 4 9 6 0 0 4 4 0 0 3 3 1 , 0 8 0 05 : 0 0 P M 0 5 : 1 5 P M 0 5 3 4 0 5 3 4 1 9 0 4 7 2 1 0 5 0 1 0 0 4 4 0 0 1 1 1 , 0 4 0 05 : 1 5 P M 0 5 : 3 0 P M 0 5 6 5 0 5 6 5 2 2 0 4 4 5 1 0 4 7 7 0 0 5 5 0 0 0 0 1 , 0 4 7 05 : 3 0 P M 0 5 : 4 5 P M 0 5 5 5 0 5 5 5 2 3 0 4 7 2 6 5 0 1 0 0 1 1 0 0 0 0 1 , 0 5 7 05 : 4 5 P M 0 6 : 0 0 P M 0 5 0 4 1 5 0 5 1 6 0 4 1 9 1 3 4 4 8 0 0 3 3 0 0 4 4 9 6 0 PM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 8 t h B l o c k TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L L T R T O T A L U- t u r n L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 04 : 0 0 P M 0 6 : 0 0 P M 1 2 2 4 4 2 2 2 4 6 8 9 1 1 8 2 5 3 3 1 9 4 8 1 0 1 0 1 1 0 0 5 5 4 , 2 1 0 PE A K H O U R F A C T O R 0. 9 1 0. 9 5 0 . 7 5 0 . 4 2 0 . 9 8 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Wednesday Co l l i n s A v e n u e 18 8 t h B l o c k Collins Ave _188th Block_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 9 t h S t r e e t C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : Wednesday TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n L T ( 8 5 6 ) T ( A 1 A ) R TO T A L L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 07 : 0 0 A M 0 7 : 1 5 A M 1 1 1 0 9 6 2 3 1 7 6 0 3 3 6 8 3 4 4 0 0 5 5 0 0 0 0 5 2 5 07 : 1 5 A M 0 7 : 3 0 A M 2 1 1 3 0 6 5 2 2 0 0 0 3 4 8 2 3 5 0 0 0 6 6 0 0 0 0 5 5 6 07 : 3 0 A M 0 7 : 4 5 A M 1 3 1 8 1 8 2 3 2 7 0 0 4 3 3 3 4 3 6 0 0 1 1 1 1 0 0 0 0 7 1 7 07 : 4 5 A M 0 8 : 0 0 A M 1 1 1 9 7 1 0 4 5 3 0 8 0 5 0 4 7 5 1 1 0 0 8 8 0 0 0 0 8 2 7 08 : 0 0 A M 0 8 : 1 5 A M 7 2 2 1 4 1 2 8 4 3 5 5 0 5 3 7 1 0 5 4 7 0 0 1 1 1 1 0 0 0 0 9 1 3 08 : 1 5 A M 0 8 : 3 0 A M 3 7 2 5 4 1 4 8 9 4 2 1 0 5 3 1 1 3 5 4 4 0 0 1 7 1 7 0 0 0 0 9 8 2 08 : 3 0 A M 0 8 : 4 5 A M 2 7 2 6 0 1 5 0 3 4 2 2 0 4 3 2 1 2 4 4 4 0 0 1 2 1 2 0 0 0 0 8 7 8 08 : 4 5 A M 0 9 : 0 0 A M 5 0 2 6 7 1 4 1 5 4 1 8 0 4 9 4 7 5 0 1 0 0 1 4 1 4 0 0 0 0 9 3 3 AM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 9 t h S t r e e t TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n L T ( 8 5 6 ) T ( A 1 A ) R TO T A L L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 07 : 0 0 A M 0 9 : 0 0 A M 11 1 1 8 3 0 4 5 3 1 8 1 3 2 4 0 1 8 6 2 3 2 1 8 9 4 0 0 4 3 4 3 0 0 0 0 3 , 2 6 0 PE A K H O U R F A C T O R 0. 9 6 0 . 9 3 0 . 7 9 N A 0 . 9 4 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Co l l i n s A v e n u e 18 9 t h S t r e e t Collins Ave _189th Street_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / 1 8 9 t h S t r e e t C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n L T ( 8 5 6 ) T ( A 1 A ) R TO T A L L T R TO T A L L T R TO T A L L T R TOTAL TOTAL 04 : 0 0 P M 0 4 : 1 5 P M 6 1 2 5 3 2 3 6 1 2 5 0 8 0 4 3 3 1 0 4 4 3 0 0 1 1 1 1 0 0 0 0 9 6 2 04 : 1 5 P M 0 4 : 3 0 P M 3 5 3 3 1 2 0 7 5 5 5 1 0 4 6 8 1 3 4 8 1 0 0 8 8 0 0 0 0 1 , 0 4 0 04 : 3 0 P M 0 4 : 4 5 P M 4 1 3 4 2 2 9 5 1 4 6 5 6 0 4 2 4 8 4 3 2 0 0 8 8 0 0 0 0 1 , 0 9 6 04 : 4 5 P M 0 5 : 0 0 P M 3 2 3 2 6 2 6 7 8 6 0 6 0 4 8 3 6 4 8 9 0 0 9 9 0 0 0 0 1 , 1 0 4 05 : 0 0 P M 0 5 : 1 5 P M 8 4 2 9 1 2 3 7 8 5 4 8 0 4 8 2 1 1 4 9 3 0 0 2 0 2 0 0 0 0 0 1 , 0 6 1 05 : 1 5 P M 0 5 : 3 0 P M 9 2 3 2 1 2 4 7 7 5 8 6 0 4 6 1 1 4 4 7 5 0 0 1 0 1 0 0 0 0 0 1 , 0 7 1 05 : 3 0 P M 0 5 : 4 5 P M 13 3 2 7 9 2 7 8 9 5 8 2 0 4 8 0 1 1 4 9 1 0 0 8 8 0 0 0 0 1 , 0 8 1 05 : 4 5 P M 0 6 : 0 0 P M 12 5 2 6 1 2 4 1 6 5 2 5 0 4 2 8 9 4 3 7 0 0 8 8 0 0 0 0 9 7 0 PM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e 18 9 t h S t r e e t TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n L T ( 8 5 6 ) T ( A 1 A ) R TO T A L L T R T O T A L L T R T O T A L L T R T O T A L TOTAL 04 : 0 0 P M 0 6 : 0 0 P M 30 1 2 1 2 3 8 1 0 3 4 3 6 2 3 4 9 0 1 8 8 4 4 2 1 9 2 7 0 0 4 2 4 2 0 0 0 0 4 , 3 1 8 PE A K H O U R F A C T O R 0. 9 1 0 . 9 6 0 . 5 9 N A 0 . 9 8 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Wednesday Co l l i n s A v e n u e 18 9 t h S t r e e t Collins Ave _189th Street_TMC DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : Wednesday TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n T R TO T A L U- t u r n T R TO T A L L T R TO T A L L Th r u - L R TOTAL TOTAL 07 : 0 0 A M 0 7 : 1 5 A M 11 5 6 2 6 9 3 1 5 2 0 1 5 5 4 9 0 0 4 9 0 3 0 3 2 7 6 07 : 1 5 A M 0 7 : 3 0 A M 5 6 5 2 7 2 0 1 2 4 0 1 2 4 5 5 0 0 5 5 0 3 0 3 2 5 4 07 : 3 0 A M 0 7 : 4 5 A M 9 7 4 0 8 3 6 2 2 2 0 2 2 8 6 4 0 0 6 4 0 1 1 2 3 7 7 07 : 4 5 A M 0 8 : 0 0 A M 12 9 9 2 1 1 3 2 2 0 6 0 2 0 8 6 6 0 0 6 6 0 4 1 5 3 9 2 08 : 0 0 A M 0 8 : 1 5 A M 8 1 2 5 8 1 4 1 3 2 5 8 0 2 6 1 7 7 0 0 7 7 0 1 0 2 1 2 4 9 1 08 : 1 5 A M 0 8 : 3 0 A M 14 1 3 7 5 1 5 6 6 2 4 6 0 2 5 2 8 1 0 0 8 1 0 4 4 8 4 9 7 08 : 3 0 A M 0 8 : 4 5 A M 7 1 5 6 2 1 6 5 3 2 1 2 0 2 1 5 8 5 0 0 8 5 0 1 0 1 4 6 6 08 : 4 5 A M 0 9 : 0 0 A M 16 1 3 0 7 1 5 3 3 2 5 6 0 2 5 9 8 8 0 0 8 8 0 8 2 1 0 5 1 0 AM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n T R T O T A L U - t u r n T R T O T A L L T R T O T A L L Th r u - L R T O T A L TOTAL 07 : 0 0 A M 0 9 : 0 0 A M 42 4 3 4 1 4 4 9 0 1 3 8 6 3 0 8 7 7 2 9 1 0 0 2 9 1 0 1 8 5 2 3 1 , 6 8 0 PE A K H O U R F A C T O R 0. 9 3 0 . 9 5 0 . 9 4 0 . 6 5 0 . 9 6 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Co l l i n s A v e n u e W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) Co l l i n s A v e _ W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) _ T M C DA V I D P L U M M E R & A S S O C I A T E S , I N C . TU R N I N G M O V E M E N T C O U N T S Pr o j e c t N a m e : Va r a d e r o P r o j e c t N u m b e r : 15158 Lo c a t i o n : Co l l i n s A v e n u e / W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) C o u n t D a t e : 5/27/2015 Ob s e r v e r : Tr a f f i c S u r v e y S p e c i a l i s t s , I n c . D a y o f W e e k : TI M E NO R T H B O U N D SO U T H B O U N D EA S T B O U N D WE S T B O U N D GRAND IN T E R V A L U- t u r n T R TO T A L U- t u r n T R TO T A L L T R TO T A L L Th r u - L R TOTAL TOTAL 04 : 0 0 P M 0 4 : 1 5 P M 15 2 2 7 7 2 4 9 3 1 6 6 0 1 6 9 9 8 0 0 9 8 0 5 3 8 5 2 4 04 : 1 5 P M 0 4 : 3 0 P M 10 2 0 1 5 2 1 6 2 1 7 3 0 1 7 5 1 1 5 0 0 1 1 5 0 3 2 5 5 1 1 04 : 3 0 P M 0 4 : 4 5 P M 15 2 6 4 2 2 8 1 6 1 3 9 0 1 4 5 1 3 1 0 0 1 3 1 0 4 1 5 5 6 2 04 : 4 5 P M 0 5 : 0 0 P M 11 2 7 2 6 2 8 9 1 0 2 2 3 0 2 3 3 1 0 6 0 0 1 0 6 0 3 2 5 6 3 3 05 : 0 0 P M 0 5 : 1 5 P M 10 2 1 3 1 2 2 4 7 1 6 5 0 1 7 2 1 2 0 0 0 1 2 0 0 5 2 7 5 2 3 05 : 1 5 P M 0 5 : 3 0 P M 15 2 7 0 4 2 8 9 6 1 7 2 0 1 7 8 1 2 0 0 0 1 2 0 0 4 4 8 5 9 5 05 : 3 0 P M 0 5 : 4 5 P M 5 2 5 1 4 2 6 0 2 1 6 0 0 1 6 2 1 4 7 0 0 1 4 7 0 2 2 4 5 7 3 05 : 4 5 P M 0 6 : 0 0 P M 8 2 4 7 4 2 5 9 6 1 8 4 0 1 9 0 1 1 9 0 0 1 1 9 0 4 0 4 5 7 2 PM P E A K P E R I O D T U R N I N G M O V E M E N T C O U N T S U M M A R Y AN N U A L A V E R A G E D A I L Y T R A F F I C C O N D I T I O N S Co l l i n s A v e n u e W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) TI M E N O R T H B O U N D S O U T H B O U N D E A S T B O U N D W E S T B O U N D G R A N D IN T E R V A L U- t u r n T R T O T A L U- t u r n T R T O T A L L T R T O T A L L Th r u - L R T O T A L TOTAL 04 : 0 0 P M 0 6 : 0 0 P M 46 1 0 0 2 1 7 1 0 6 5 2 2 7 1 2 0 7 3 3 4 9 2 0 0 4 9 2 0 1 5 8 2 4 2 , 3 1 4 PE A K H O U R F A C T O R 0. 9 2 0 . 8 0 0 . 8 4 0 . 7 5 0 . 9 2 No t e : 2 0 1 4 F D O T P e a k S e a s o n C o n v e r s i o n F a c t o r = 1 . 0 3 Wednesday Co l l i n s A v e n u e W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) Co l l i n s A v e _ W i l l i a m L e h m a n C a u s e w a y ( S R 8 5 6 ) _ T M C WILLIAM LEHMAN CAUSEWAY & A1A SUNNY ISLES BEACH, F],ORIDA COUNTED BY: C. PALOMINO & A. PALOMINO SIGNALIZED Tr:FFir CrrrlrFr/ Cha.ir'l i<r< Th. 624 Gardenia Terrace nFlr^v RF^.h Fl^r'ida 33444 Phone (561) 272-3255 ALL VEHICLES SiLe Code ; 00150110 Start Date: 05/27/15 Fi-1e I.D. : LEHC_A1A Page : 1 UTurn Left Thru Right. UTurn Left Thru Right I uTurn Left Thru Right I UTurn Left Thru Righc I Tota] DaCe 05/27/L5 ----- From North DRIVEWAY From East I A1A I rrom sourn I I LEHMAN CAUSEWAY I l rom wesc I o49 0 55 o64 0?:00 07:15 0?:30 0 0 0 2l 2l 0l ol ol ol 276 254 3'1'7 392Q7r45 2 O 206 0 0 0 4 7l 0 0 0 99 2l o 66 o o I 30752 00724 51222 o o 3 ol o o 3 0l 0 0 1 1l 0 0 0 0 11 5 9 T2 56 55 74 Hr Total- 10 L 704 0 0 110 0 0l 0l 0 0 0 0 0 0 0 008:45 3 0 256 0 08:00 08:15 08:30 2L254 60246 302L2 0 234 0 0 0 0 0 | 729e o I 49i. 0l 497 ol 466 0 5l-0 10 4 1 8 2l 2l 4l ol 2l 37 I 7 294 125 137 155 130 6l 8l sl 2l 7I '17 81 85 88 0 0 0 0 0 0 0 0 0 I L964Hr Total 14 L 972 0 0 0 0 54845a18l 3 2 1 2l 22 1 7 5 2 6 331 L6:00 3 L6:15 2 L5:30 6 0 166 0 173 0 139 0 0 0 0 0 0 0 0 5 3 3 0 0 0 0 15 10 15 11 0 0 0 0 0 0 0 o ))1 207 264 272 98 1L5 131 106 0l 524 0 I s11 ol 562 0l 633L6:45 10 0 223 0 Hr Total 2l 17:00 '7 17:15 6 ).7 r30 2 0 701 0 165 0 r72 0 160 0 | 22300 0 0 0 L7:45 6 0 184 0 l I5 8l 51 10 15 5 964 2r3 zu I 1l 450 0 0 0 0 0 s 21 0 0 4 4i 0 o 2 21 0 o 4 0l 0 27O 4 | 4l 247 4l 0 l19 o 0 | 25). 0 120 0 120 o t47 0 0 0 ol ol ol s23 595 573 Hr Toeal 2),0 681 0l 15 8l 38 981 tJ I 0 s06 0 | 2263 *TOTALT 3 058 ol 26 1 27 8'7 61 L52T 0l 7756 WILLIAM LEHMAN CAUSEWAY & A1A SUNNY ISLES BEACH, FLORIDA COUNTED BY: C. PAI,OMINO & A. PALOMINO SIGNALIZED TrAffi^ C,,rl'aa/ q^a.i.licfa Tn. 624 Gardenia Terrace nAlrav F|FA.h Flnrida 33444 Phone (561) 272-3255 AIJIJ VEHICLES site code : 00150110 Start Date: 05/27/L5 File LD. : LEHC_A1A Page : 2 A1A From North UTurn Left Thru Right Peak start 08:00 VoLume L4 I 972 0 Percent 19 0t 98t 0* Pk total 987 Highest 08:00 Volume2l2580 Hf totaf 26r PHF .95 LEHMAN CAUSEWAY 45 23 0 331 331 I 4s s48 22 ) 7* 89r 4r l I I 7 L56 2l I I DRlVEWAY From East lAlA I trom Soutn I T,EHMAN CAUSEWAY I From WesC ll UTurn Left Thru Right I UTurn Left Thru Right I UTurn Left Thru Right I Total DaEe 05/27 / 15 ----------- Peak Hour Anal-ysis By Entire Intersection for the Period: 07:00 Lo 09:00 on 05/27/I5 08:00 0 0t 31 08:00 0 .65 0 0t 23 742 10 v tz A1A I og, oo 8l o 26t | 0r 6t 5 08:30 20 I 165 I .93 08:00 0 331 0* 100t 331 08:45 0 88 88 .94 00 0* 0g 15 2368 331 548 8 nU > tz 15 'I>6 t 887 7'874 [ t -l ALL VEHTCLES | - | | 31 23rl lrtl l3ee68L0 I'rr_ r-r-331 | Intersection Total I | | r'e64 | "ll 15 n zztlll-I DRIVEWAY I 1' 587 ----------------161q,l 0il.451. 548 972 0 972 54845 A WILLIAM LEHMAN CAUSEWAY & A1A SUNNY ISLES BEACH, FLORIDA COITNTED BY: C. PALOMINO & A. PALOMINO SIGNALIZED Traffic Survey specialj-sts, Inc. 624 Gardenia Terrace npl rav RFe.h Fl ^ri.la 33444 Phone (561) 272-3255 ALL VEHICLES site code : 00150l-10 Start Date: 05/2'1/75 File I.D. : LEHC_A1A Page : 3 From North I DRTVEWAY 1 from EasL l I A1A I From South I ILEHMAN CAUSEWAY I From West I UTurn Left Thru Right UTurn Left Thru Right I UTurn Left. Thru Right I UTurn LefL Thru Rj-ght I ToLa] DaEe 05/21/75 -- Peak Hour Anal-ysis By Entj-re Intersectj-on for the Perj-od: 16:00 to 18:00 on 05/27/15 Peak start 16:45 | 16:45 volume 25 O 72O 0l 0 Percent 3t 0g 97$ 0t I 0t Pk total 745 24 Highest L6:45 I 17:15 Vo1ume 10 O 223 0l 0 Hi ror.al 233 I 8 pHF .80 I .'75 | 16: as 01410i041100615 0g 58* 42* | 0t 4* 95* 18 | 1oG2 I re, as o 4 41 0 11 272 6 | 28e | .e2 AlA '720 493 1,006 10 720 1 trno 'II+3 r ,'7 g2 16: 45 049300 0t 100t 0t 0r 493 17:30 or4700 !47 .84 25 25 LEHMAN CAUSEWAY 4I I4 U 10 L455 a atrA - a,zJ'i t I - ALL VEHTCLES ,-l--l - fr.rJr-r v.Ern-L\-r-r.crD t "lll24rl ll I '-s 64 L I493 | Int.ersection Tota1| 2,324tll- J - ', ?o.) - 10 L4 493 493 40 DRIVEWAY 25 15 .4L r,062 l_,006 720 720 4I 1, 005 A n I{ILLIAM LEHMAN CAUSEWAY & A1A SUNNY ISLES BEACH, FLORIDA COUNTED BY: C. PALOMINO & A. PALOMINO SIGNALIZED Traffic Survey Specialists, Inc. 624 Gardenia Terace nFlrav Raa.h El^rida 33444 Phone (561) 272-3255 PEDESTRIANS & BIKES site code : 00150110 start Date: 05/27/L5 !aae 1.u. : !tsnu ArA Page : l- A1A From Nortlr I DRTvEwAY I !rom Easc I I A1A I From south I ILElI'IAN CAUSEWAY I trom wesr I Lefr BIKES Right peds I Left BIKES Righc Peds i Lefr BIKES Right. Peds I Lefr BrKES Right Peds I Total DaEe 05/27/75 07:00 0 0 0 0 07:15 0 0 0 1 07:30 0 0 0 0 o7:45 o 0 0 0 | o 6 0 1 0 1 0 0 | o 1 0 7 0102 0100 0001 0000 0000 0303 0101 0103 0101 5 6 9 HrTotal 0 0 0 1l o e o 08:00 0 0 0 08:15 0 0 0 08:30 0 0 0 o 3 o 10 |0 0 0 1 0 8l 08:45 0 0 0 0 I o o 0 3l 0 1 0 10 | 604 o 3l o 3 0 10 l o o o 6l 0 0 0 3l o o o ol o o o ol o o o ol o o o 3l o o o ol o 1 o ol 36 13 r2 4 20 Hr Total 0 0l o 5 o 31 |o o 6l 1 o 5l 49 11 7 2g 0 0 0 2l 0 4 0 '7 1 o o 0 5t 0009 0 0 o 3l o o o ol 0 0 0 0, 0002 0000 0000 0006 0106 0108 0 0 0 o 0 0 0 o 0 0 0 0 16:00 15:15 16:30 L6245 55 5 6 11 24 )l o 5 0 2'7 1 008 o o o 72 I 1 o 12 l 0 0 0 s 0006 0 0 31 0 0 0 0l 0 1 o o 1 0 11 0 0 0 31 0 0 0 1 1 0 21 0 2 0 1 O 1 O 1 0 0 0 0 1l ol 3l 0l 0 0 0 0 0 0 0 0 0 0 0 0 Hr Total 17:00 17: L5 17:30 77 :45 Hr Total 4l 3 0 18 |209 2 0 8l 46 *TOTAL*7l 82 zol 36 I 186 -fir -1, t +r4'll t e urlirg{frnct vl 1+ir4r 1-l-m Sqn "y Is t€s bah, FOr;dd_ I Ap.: L lb ?ots d far^r ^ hd, tJ^t < .PaID mi nc Si6nafa-e<L 189TH STREET & COLLINS AVENUE SUNNY ISIJES BEACH, FI'ORIDA COUNTED BY: M. CRUZ & A. CRUZ SIGNALIZED I LU!!rND AVeNUE I Fr^m N^rrh start I TrrfFi a crrrlrFr/ cna.i r1 i efc Tn. 624 Gardenia Terrace nFl rav RF^.h Fl.ri da 33444 Phone (561) 272-3255 ALL VEHICLES I LU!!rNJ AvEr\UE I From South I study Name: 189SCOLL site code : 00150110 Scart Date: 05/27/L5 Page : 1 I DRTVEWAY | !rom Easr I I 1 AOTU CTDFFT I from wesc I I r ntvr Lef t IITlrrn Thm Rioht lTot-al O7: OO I 07:15 | O7:30 | O7:451 I 6 | 6, E o I lf o 111 11a sl a2i 0 0 0 0 0 0 0 0 I 8l 2l 1l 7l 0 0 0 o 0 0 0 0 0 0 0 0 I ol ol ol 0l I 3l 21 ?i 0 0 0 0 0 0 0 0 0 0 0 0 336 348 433 504 109 130 181 62 65 82 104 t 2 1 1 I 1 3 I HOUr I I 08:00 | 08:15 | nq. ?n I 08:45 I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 '7 3 2 5 2 7 7 0 0 0 0 0 0 0 0 0 0 0 0 0 l62r 537 531 432 494 201 I 10 t2 7 ul I ^l ^lul ol 0l 1?l I 4l el 3l 5l 677 313 2).4 128 254 148 260 1s0 267 74r 3Al 262s I r r I ql1 17 | 982 1) | C?A t4l 933 16 995 567 27Hour 0 l 0 1994 42 0 l o o ol r7 I 6 3 4 3 0 0 0 s4l 3706 t-----tl r-6:001 0 0 433 101 o o o o 16:1sl O O 468 131 O O O O 16:301 0 0 424 8l O O O O 16:451 0 o 483 6l O O O O 1 5 1 2 1a 5 74 8 253 236 331 207 342 295 326 267 1000 looo 000 looo l 11 I 962 8 I 1040 8 | 1096 9 i 1104 Hourl 0 o 1808 371 O O O O] 16 tl 17:OOl O O 482 111 17:151 0 0 461 141 r-7:301 0 0 480 111 L7:451 0 0 428 9l 1252 1005 39 I 29I 237 8 327 247 7 l 279 278 9 I 26'J- 24r 5l 0 0 0 3614202 I 0 0 0 2ol 1061 0 0 0 101 10?1 0 0 0 81 1081 0 0 0 81 9?o 0 0 0 0 0 0 0 0 0 0 0 0 2 3 5 I 0l 8 0l e ol 13 0l 12 HOUI I 0 0 1851 4sl ol 42 14 rr52 1003 30 l 0 0 0 461 4183 'IOtal I Anr t Int. I o | 80 I r.r - | o.s i 10? | 1.41 o.7l 00 I 7274 L44l 98.0 1.91 49.4 0.91 4s 4016 2888 0.6 56.3 40.4 0.3 27.2 i.9.6 I u looll+/lo 100 0 | 189TH STREET & COL],INS AVENUE SUNNY ISLES BEACH, FLORIDA COUNTED BYr M. CRUZ & A. CRUZ SIGNALIZED araFFit q,,rlrF\r C^a^iAl i at < Tn. 624 cardenia Terrace nol-Aw Raa.h Flnrid2 33444 Phone (561) 272-3255 ALL VEHICLES Sit,e Code : 0015 Start Date: 05/2 File I.D. : 189S Page : 2 COLLINS AVENUE From North UTurn Left Thru Right I DRTVEWAY DaEe 05/27/15 ------ Peak Hour Analysis By Entire Intersection for the Period: 07:OO to OgiOO on 05/27/f5 From East I coLLrNs AVENUE 1 rrom sourn I 189TH STREET I From west I I rHRU I UTurn Left Thru Rj-ght I UTurn Left A1A Thru Right UTurn Left Thru Rjght I Peak starE 08:00 VoLume00799442 Percent 0& 0t 98* 2* Pk total 2036 Highest 08:00 Vofume0053710 Hi- total 547 PHF .93 189TH STREET 33 0 42 lo I oz, oo looo lo | .0 0l 2 | 422 | .e6 COLL]NS AVENUE L,994 I og, oo loo lo*ot 00 0t 0t | 08:00 \ 11 I 1r 1616 08:30 ro to / lt 358 08:00 00 0t 0t 54 08:15 00 77 .79 99s 62+ 260 2T 1t 3 0 0t 54 100* 77 42 150 n n '75 421 L,9941 0 r ,562 'I Otal- r,6L6 .-----------l r ,562 27 2I DRIVEWAY n 2L 54 trA 2 ,048 COLLIN 33 AVENUE r ,562 189TH STREET & COLI,INS AVENUE SUNNY ISLES BEACH, FLORIDA COUNTED BY: M. CRUZ & A. CRUZ SIGNAIIZED Trrffin crrrlra\/ cha.i^liefq Tn. 624 Gardenia Terrace nFlraw RFA.h Fl.rida 33444 Phone (561) 272-3255 ALL VEHICLES Site Code : 0015 start Date: 05/2 File LD. : 1895 Page : 3 COLLINS AVENUE From North I DRIVEWAY l !rom EasE I coLLrNs AVENUE I trom Soutn i 1 eqrH qrpFFT i r rom wesr llrHRUl UTurn Left. Thru RighE I UTurn LefE. Thru Right I UTurn Left A1A Thru Right I UTurn Left Thru Right DaEe 05/27 /rs Peak Hour Analysis By Ent,ire Intersect.ion for t.he Period: 16:00 to 18:00 on 05/2'7/75 PCAK STATE ]b:JU Volume 0 Percent 0* Pk total 1889 Highest 17:00 Volume 0 Hi- total 493 PHF .96 189TH STREET 33 0 39 00 0t 0* COLLINS AVENUE 16:30 24 9 1046 1280 37 1t 0t 44* 53t 2* 2396 16:30 4 1 295 342 L4 6s6 .91 16:30 00047 0g 0t 0* 100t 17:00 00020 20 .59 0 1850 39 0* 98* 2+ 16:30 00 0t 0* 0 07:00 00 0 .0 39 0 2,326 0 12 4 .2L5=tzLJ t I-l ALL VEHICLES --l--l-fu!v.cr.nr_\-Li.ErD[-: llulr rl I lle 37 L I 4i | ,"rersection Totat I l___l 4'33', I I :etu, 39 1, 850 1, 889 1, 850 4'l 2 ,326 oll . 331.2,326 -- DRIVEWAY n U 3',7 47 41 33 2 ,326 COLL]NS AVENUE 189TH STREET & COLLINS AVENUE SUNNY ISLES BEACH, FLORIDA COUl,ilfED BY: M. CRUZ & A. CRUZ SIGNALIZED TrrFfi n e,,r!'aa' qna.i rl i cia Tn- 624 Gardenia Terrace nplrA\/ qFe^h Fl^rida 33444 Phone (561) 272 3255 PEDESTRIANS Slte Code : 00150110 start Date: 05/27/L5 File I.D. : 189SCOLL Page : 1 CO],LINS AVENUE From North 0 0 0 0 0 0 0 1 I DRTVEWAY | !rom Easr coLLrNs AVENUE | 189TH STREET I From South I From West tl Left BIKES Right Peds I Left BIKES Right Peds ] BIKES Peds I Left BrKES Right. Peds Date 05/27/15 07:00 07: l-5 07:30 O7 :45 1l 2l 2l 1l 0 0 0 0 o 1 o sl L 0 4l 0 2 0 6l 0 5 o 8l o0l 0i04 o0l ooo3 001 0104 ool o1o2 10 I2 13 22 Hr Total 5l 08:00 0 000 o 23 |ol 0 0 0 0 10 | 14 1sl 13 | 0 13 001 0 1 0 2l 57 2L 15 I2 18 08:15 08:30 0000 002 0 0 0 0 5 0 1 001 0105 001 0100 0 0 | 0 2 0 2) 08:45 0 0 0 0 J Hr Tot.a1 0 0 0 2l 42 1 00 s o el 66 16:00 0 0 0 2 16:l-5 0 0 0 0 16:30 0 1 O 2 16:4500O21 0 0 0 0 2 1 2 3 0 0 0 0 7l 1l 1) |-- | 7l o o o 0l o o 0 0l 0 0 0 2l 00 00 00 11 2 79 720010 0 0 0l Hr Total 0 1 17:00 0 0 I7tl5 0 0 1?:30 0 0 17:45 0 0 06 0 0 0 0 ol 3l 5l 2l 0 1 0 3l o 1 0 10 I 0 2 0 3l o 2 0 9, 27 1 001 0002 0 0 0 0 0l 0 0 0 0 1 0 2 3 0 0 0 0 2l ol sl 3l 0l 0j 01 44 7 T4 I7 19 Hr Total 0 0 10 |06025 ol 10 |57 *TOTAL*2^ |11a I ol 34 224 M 9t, rsq sr il + +lr Vr l+t'U r tt It rl ll +r I 4/ $$l +lrl {l | ',b tl S*nnl.fstes Bdn r Ft-or, *e_ . Afl;t r<.Zorf J.n*,r3i l,'u'shlo &r r no b.tnaLncJ 188TH BLOCK/PI,AZA DRIVEWAY & COLLINS AVENUE, SUNNY ISLES BEACH, FLORIDA COTNTED BY: ANDREW GONZALEZ NOT SIGNALIZED Traffic Survey Specialists, Inc 524 Gardenia Terrace nplrev Ra^.h Flnrida 33444 Phone (561) 272-3255 ALL VEHIC],ES Si.te Code : 00150110 StarL Date: 05/27/15 File I.D. : 188B_A1A Page : 1 I UTurn Left Thru Right I UTurn Left Thru Right I UTurn LefE COLLINS AVENUE From North 13 24 23 \4 26 DRIVEWAY From East I coLLrNs AVENUE l from souLn | 188TH BLOCK i rrom wesr I Thflr Pidht I IlT,,rn f ^'-r\rYrrL I vrurrr Thvrr D i ^hf 1 0t41 07:00 0?:1.5 07:30 08:00 08:15 08:30 08:45 03271 0 335 4 0 0 0 0 cl 447 sl 472 7l 00324 0 0 389 00404 s18 6 |o o ol o 0 o 1J 0000 1000 1-01570 00I920 00251,0 0 0l ol o o 401 0 |0000 0000 0 o 0 1l o o o 0l 0001 0000 0103 0000 0003 0000 s00 544 69115 0 419 2 o7:4s 17 1 488 3 o O O 0l 0 o 290 ol o o o 0l 799 Hr 'totat 5 |1 1s69 10 L 4l 0 890 0l 0 r | 2534 481 872 902 974 907 Hilr'otat 87 1e18 23 |0 0 1l 0 0 7522 ol 0 0 1 1 3l 3555 16:00 16:15 15:30 l6:45 4r7 447 402 470 6 5 9 5l 479 511 576 25 27 2I 20 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 1 3 0 0 0 0 0 2 0 0 0 0 0 0 0 1 0 0 01 00 02 929 993 1069 0 4 I 1080 Hr Total 17:00 17 t75 77 z30 17 :45 93 19 22 23 16 25 1 10 I 10 I 5l 13 | sl 1l ol ol 4l 2 01 ol ol 1l 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 L7 36 472 445 472 4r9 2r99 534 565 555 504 104 0 I047 1057 950 0 7J 407r 0 0 0 0 4l sl 1l 3l Hr Total 80 18 08 sl 2754 1l 1r I 4704 *TOTAL*377 7031 e7 l 67 69 3l 24 1 L4264 188TH BLOCK/PLAZA DRTVEWAY & COLLTNS AVENUE, SUNNY ISLES BEACH, FLORIDA COIJNTED BY: ANDREW GONZALEZ NOT SIGNALIZED Tr.f f i^ crrrlrar/ qha.ir'l:--^ 524 Gardenia Terrace nAl r:\' Poa.h Fl ^r'i da 33444 Phone (561) 272-3255 ALL VEHICLES Site code : 00150110 Start Date: 05/27/15 File I.D. : 1888_A1A Page : 2 CoLLINS AVENUE I DRTVEWAY From North I From East I UTurn Left Thru Right I UTurn Left Thru Right UTurn Left Thru Right I UTurn Lefc Thru Right I Tota] DaEe 05/27 /L5 ----------- Peak Hour Analysis By Entj-re Intersection for the Period: 07:00 t.o 09:00 on 05/27/75 I col,r,rNs AVENUE trY^m q^rrtsh | 188TH BLOCK I From West. I Peak st.art 08:00 volume 6 / Percent 4t Pk EoLal 2028 Highest 08:00 Volume 24 Hi total 548 PHF .93 188TH BLOCK 0 19r-8 23 0t 9sc r-t | 08:00 COLLINS AVENUE 1, 918 08:00 08:00 00 0& 0t 3 08:15 00 3 .25 1 o o 11 0 0 509 0* o* sot I ot o& 2 | 1522 08;15 | 08:30 o o o 1l o o 1 | 408 .so | .e3 t522 0 100t 0$ 03 0$ 100t 408 23 87 0 L,522 1 23 '1 ql a r ,9r8 3 1,523B7 0 23 23 J, f I t -l ALL VEHICLES F]rlli | 26 8e L I tt3 | Intersect.ion Total I | | 3'sss Itl I 3 ,444 L .I,522:------.1 l'^1"zrvz6 3, 551 t 1ll . 01.r,522 6T DRIVEWAY 87 0 0 L,922 0 AVENUE r,522 COLLIN 188TH BLOCK/PLAZA DRIVEWAY & COLLINS AVENUE, SUNNY ISLES BEACH, FLORIDA COTNTED BY: ANDREW GONZALEZ NOT SIGNALIZED Traffic Survey Special-ists, Inc. 624 Gardeni-a Terrace nFlrav FF^.h Fl^rida 33444 Phone (551) 272-3255 ALL VEHICLES Slte Code : 00150110 Start Date: 05/27/1,5 File I.D. : 1888_A1A Page : 3 COLLINS AVENUE From North DRIVEWAY From East I coLLrNs AVENUE | lrom souLn I I 188TH BLOCK From West UTurn Left Thru Rj.ght. UTurn Left Thru Right I UTurn Left Thru Right UTurn Left Thru Right Total DaLe 05/27 /r5 ----------- Peak Hour Analysls By Entire Interseccion for the Period: 16:00 to 18:00 on 05/27/15 Peak starE 15:30 Volume 82 I 7789 34 PercenE 4+ 0t 94* 2% Pk total 1906 Highest 17:00 Volume 19 O 472 10 Hi total 501 PHF 16:30 00 0s 0t 5 16:45 00 3 .42 05 0* 100t I i.G,30 lo I o& I 2310 | 16:30 l0 | 634 | .e1 0 2308 0* 100t 16:30 00 0t 0t 15 L7:L5 00 5 .75 0 15 0t 100t 2 0* 188TH BLOCK 34 COLL]NS AVENUE . 1 ?qqL I t vr B3 0 2,308 5 L ,'7 89 | '1 o^r IJ_, yuo 34 B3 2 ,3]-3 2,308 85 DR]VEWAY 34 34 83 U 2 15 15 1,804 0 AVENUE 2 ,308 4.2L9='zJ-r - t I -l Ar'L VEHICLES r-l---l . fiLL VErIJ-LLI1D l--:ll:lr rl | +s so L I ls | ,r.ersection Tot.at I | | 4'23u It- I - 4 11L | =, LL= I ' '2 ' 31-o ------------r I COLLIN 188TH BLOCK/PLAZA DRTVEWAY & COLLTNS AVENUE, SUNNY ISLES BEACH, FIORIDA COUNTED BY: ANDREW GONZALEZ NOT SIGNALIZED Tr5ffi ^ errrrrarr aha-i.l i ^ts-oq! vcy oPcera 624 Gardenia Terrace nFlr^v Pea.h Flnrida 33444 Phone (561) 2'72-3255 PEDESTRIANS & BIKES site code : 00150110 Start Date: A5/27/1,5 File I.D. : 1888_A1A Page : 1 tl Left BrKES Right Peds ] Left BrKES Right Peds I Lefr BIKES Right. Peds I Left BIKES Right Peds DaEe 05/27/15 COLLINS AVENUE From Nort.h DRlVEWAY From East 07:00 07:15 07;30 0 0 0 0 0 0 0 0 0 ol ol ol O7t45 0 0 0 0 |0301 I coLLrNs AVENUE I lrom Sourn 0 0 0 0 0 0 0 0 1 188TH BLOCK trom west 0 0 0 0 10EaI o o o 3l 0002 0 0 0 3l 0 0 0 0 0 0 0 2 0 0 0 0 2l ol ol 3l 1 6 0 4l I 3 L3 Hr Total 0 ol ol el 08:00 0 0 0 0 0 0 8l 08:15 0 0 0 0l 0 0 7l sl ol 0l 0 0l 11 | 5 0 21 0l 30 13 I 6 7 08:30 0 0 0 1l 08:45 0 0 0 0 0 o o 3l 0 0 0 ?l 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 HrTotal 0 0 0 I 0 0 0 2s I 0 '1 | I 11 -l 0 0 o 0l o 0 0 ol 0 o 0 2l ol ol ol ol 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0l 0 1 o o 0 0 0 0l 0 1 o 3 0 0 0 0l 0 0 o 9 o o o 0l0 0 0 ol 0 0 0 3l 16:00 16: l-5 L6:30 15:45 19 11 I 3 14 o 0 ol 0 2 0 1s I 0 0 0 2l 8l sl ol 9I ol 0 o 2l l I 2 3 3 2 0 0 0 0 1 0 0 0 0 0 0 o 0000 0000 0 0 0 0r 0 0 0 0 0 0 0 1 0 0 0 0 0000 0 o o 0l o 0 o 0l 0 0 0 0l Hilt o tat 17:00 17:15 7'7 :30 ).7 :45 Hr Totaf o 0 2l 0 0 0 0l 10 |36 *TOTAf,*3l 7r I sl 30 | 11e 51"r*h ,a vt.r \r4\r.t a$- entktdravt.-\- //.--Y/ 1l r+ rt 1lrl tl ll lf lt rllll ,{/ r{ 16l ltr r lu tlll,' It;: flrrn I lrtvl |.{ t .tu ? vr 3+N,i 6i ttcnnitrnt fr*z*+# Su,nn.f fstzs hc!n, Flor-uJct tlral Zr,zo t{ dr^,^.,nbi. Lu-K Pc\outi no n,oT-si6noJzeJ, 186TH STREET & A1A SUNNY ISLES, FLORIDA COUNIED BY: ISIDRO GONZALEZ NOT SIGNALIZED Traffic Survey SpeciaIj.sts, Inc. 624 Gardenia Terrace nAlraw RFA.h Fl.r'ida 33444 Phone (561) 272-3255 ALL W/ T86?I DWY, PORSCHE DRIVEWAY sit.e code : 00150110 St.art Date: Q5/27/15 File I.D. : 186S_A1A Page : 1 A1A From North I DRIVEWAY | ! rom Easr I A1A I From South I | 186TH STREET I From west I UTurn Left. Thru Right I UTurn Left Thru Right I UTurn Left. Thru Right I UTurn Left Thru Right I Tota1 DaEe 05/27 /L5 - ---------- 07:00 2 07:15 3 07:30 2 )" 327 0 339 0 410 I 152 L I92 l- 0 5 0002 0002 0101 0003 0200 0301 0 1 0 L2460 4l 1 493 541 670 815o7:45 4 1 502 3 o 1 o 4 | 0 0 288 5 I 0203 Hr Total 11 4 ).57I 91 0 6 0 8l 3 878 101 3082519 sl 4l 6l 3l 3 0 sl 3 0 sl 2 0 41 08:45 2 4 4'77 3 | 0 0 0 9 l 08:00 08:15 08:30 323 398 402 410 1 1 5O2 61 0 8 1 49O 3l o 9 2 4s7 61 0 1 1 0 1 3 3 4 3 0 0 0 0 1 1 0 2 0 0 0 0 2 I 8s3 3 920 r- I 893 41 918 Hr Total 20 I Le26 181 0 0 23 l 13 1533 18 |r0 I 3584 16:00 9 2 15:15 5 0 16:30 7 O 16:45 11 3 0 3 477 13492 22631 34577 420 448 404 465 0 1 I 2 0 0 0 0 2 0 0 0 0 0 0 0 5 2 2l 1l 3l 4l 4203 0101 0000 918 959 1055 0102110?0 Hr Total 32 5 17:00 l7:15 17:30 L7 :45 8 7 7 2 1 1 0 3 o 4 | 10s2 0 1 0 el 1020 o r. 0 1 | 103? 0 1 0 1 | qq1 t7 37 493 43'7 4'17 431 4l 1l 2l 3l 2l l7 2 r-1 6l 4l 0 0 1 0 2 1 2 0 0 0 0 0 6 rz zLdl 10 | 2l8 525 4 s46 7l 0 s 537 0l 124q4sl 4 o 61 4OO2 Hr Total 28 L832 8l 11 |8 19 21.02 14 |0 6 0 1? I 4060 TTOTALT 24 7073 61 |52 41 14 16547668 0 186TH STREET & A1A SUNNY ISLES, FLORIDA COTNTED BY: ISIDRO GONZALEZ NOT SIGNALIZED ar^ff;. qlr^ral, Cna^i:1 i cFc Th. 624 Gardenia Terrace nAl r^v RFa.h trl ^ri da 33444 Phone (561) 272-3255 ALL W/ 18671 DWY, PORSCHE DRTVEWAY Site Code : 00150110 Start Date: 05/2'l/15 File I.D. : 185S_A1A Page : 2 I UTurn Left Thru Rj.ght UTurn Left Thru Right I i dhF TTT,,rn L6fF Thr,, P i dhfulurn .Lerc Inru R-...- A1A From North T6 0 1B I DRTVEWAY I From East I A1A I r rom 5ouc.n 27 1 I 186TH STREET I From West 08:00 04 0t 29+ T4 08:45 Total DaEe 05/2'7 / 15 -- --------- Peak Hour Anal-ysi.s By Entire IntersecEion for the Period: 07:00 to 09:00 on 05/27/fs Peak st,art. 08:00 Volume 20 Percent 1t pk tocal ].972 Highest 08:00 Volume 1 Hl toEaf 5au PHF .97 AlA I 1925 18 0t 98t 1t | 08;00 log I o* 26* | 31 | 08, as 08:00 3 13 1533 18 0t 1* 98t 1t L567 08 :45 1 3 410 3 4I7 .94 o23 0t 74* 0 10 0t '7r* loooe le I .85 . 18.n .L,926.0 4204 6 .58 A= z5 r ,926 t' 28 Bil. 18 1, 560 185TH STREET 3.532 -J'JJ.I 123 I-l ALL W/ ]-867L DWY. ALL W/ ]-867L DWY I PORSCHE DRIVEWAY I | | 31 0 rl lltlt487?18t, r- | :L4 | Intersection Total I| 3,584 | n,ll 1A 34 4 0 28 0 18 10 0 1n!v ttltll-I DRIVEWAY J - a ra a I J I JLL 161. 1,5330t. 0r,92611. 10 1 q/l/l I6 AlA 186TH STREET & A1A SUNNY ISLES, FLORIDA COItNTED BY: ISIDRO GONZALEZ NOT SIGNALIZED Tr:ffi a q,,rrrav qha.i r1 r ^F^uu! vLf JPuuru 624 Gardenia Terrace nAlraw RFA-h Florida 33444 Phone (561) 272-3255 ALL W/ 18671 DWY, PORSCHE DRIVEWAY Site Code : 001-50110 qt:rf nrfa. nC/)a /1q File LD. :1865_A1A Page : 3 UTurn Left Thru Right I UTurn Left Thru Right I UTurn Left Thru Right I UTurn Left Thru Right DaLe 05/27/15 ----- Peak Hour Analysj-s By Entire Intersection for the Period: 16:00 to 18:00 on 05/27/15 A1A From North I DRTVEWAY I From East I I A1A I from sourn l 3B 0 186TH STREET L From West I 't otal Peak starE 16:30 Volume 32 6 Percent 2* 0t Pk total 1843 0 3 0 10 0t 23t 0t 77* 13 16:30 000s 5 .65 16:30 | L2 18 227s 16 | 1t 11 98s lt I 232r I 15:30 | 2 2 531 3 | 538 I .91 16:30 0 5 0 r-5 0t 25+ 0t 75* 20 1,7 : 15 0109 10 .50 16:30 Highest 17:00 Volume 6 2 493 Hi total 502 PHF 92 186TH STREET 77ee 6 | 98* 0& | I I 1l I l A1A 0 Lt,rr.n 5 2,275 10 1 ?OO 2 ,290 'r o41 tatJa 3ll . 301.2,2'7s1. 12r,'leell. ol. ol. 4 15 2 ,275 3B 30 0 6 36 4.133 | rLIIJJI I-t ALL W/ 1-8671 DWY t- | . A.L! wl t_oo /t lJyYt l-lI PORSCHE DRIVEWAY I | | 13 tl ll lu.6iL I tl20 | Intersection Tota1 || 4 ,1,97 |lll I 4,r38 ---------------- 5 0 54 DRIVEWAY 38 n L6 15 0 15 30 A 186TH STREET & A1A ST'NNY ISLES, FI,ORIDA COIJNTED BY: ISIDRO GONZALEZ NOT SIGNALIZED Tr:ff i a cltflt6\r aha^i -l i ^F^ru! vcy oPLefq 524 Gardenia Terrace nFl rav Rpach Fl ^ri.la 33444 Phone (561) 272-3255 PORSCHE DRIVEWAY site code : 00150110 Start Date: 05/27/L5 File I.D. : 1865_A'1A Page : 1 A1A From North Ulfurn Left Thru Right I DRIVEWAY From East lAlA | !rom Soutn | 1B6TH STREET | !rom west I Ulfurn Left Thru Right I UTurn Left Thru Right Ufurn Left Thru Right I Total Date 05/27/r5 ----- 07:00 0 0 0 0 07:15 0 0 0 0 07:30 0 0 0 0 3 2 1 4o7:45 0 0 0 0 | o o 0 1 | o o 0 3 |o o 0 0l o o o 31 0 0 o 0 o o o 11 0 o 0 o o o o 0l o o 0 o 0000 0100 0100 Hr Total 0 0 08:00 0 1 o 0l 0 2 o 11 0 o 0 7l o o o ol 000 2 0 0 0 0 0 21 0 21 0 11 0 0 0 0 0 0 0 21 0 21 0 31 0 0 0 0 0 0 0 0 0 0 08:15 0 0 0 0l 0 o 0 o ol o oR!4q o o o o I o 0 o 4 | 0 0 0 2 | 0 0 o 0 10 08:30 7 6 HrTotal 0 1 0 0l 0 el el 0 0l 2I 16:00 0 1 16:15 0 0 16:30 0 0 0 0 0 16:45 0 0 0 0 0 0 o 11 0 0 0 2)o o o ol ol 0l 0 0000 0000 0000 0 1 0 11 0 0 0 0 o o o 1l o o 0 0 0 0 0 2 | 0 0 0 1 3 1 3 3 0 1 0 sl 0 o 0 3 o o ol 100 0L ol ol Hr Total 0 1 l-7:00 0 0 17:15 0 0 17:30 0 0 0 1 1 2 0 0 0 0l 0 0 0 0 0 0 0 0l o o o ol 0 0 o 1l o o o o 0 1 o ol 0 o o o 0 o o o 0 0 0 1'7:45 0 0 0 0 l oootl 0001 0000 Hr Total 0 0 L 0 1l 0 0 2l 000 *TOTAL*0 16 1 27 0 185TH STREET & A1A SUNNY ISLES, FLORIDA COUNTED BY: ISIDRO GONZALEZ NOT SIGNALIZED Tr5F€i- a,,rrraar q^a.i.l i <fq Tn. 524 Gardenia Terrace DFI rav Reaeh . Fl ori da 33444 Phone (561) 272-3255 PEDESTRIANS Site Code : 00150110 etr ri nr tsF. nq /21 | 1 q File I.D. : 186S_A1A Page : 1 A1A From NorEh 08:00 0 0 08:15 0 0 08:30 0 0 o 3 0 23 | o 0 0 0 16 I 0 0 1 0 91 0 0005 o o 0 2l o 2 o 6l o o o 7l I DRTVEWAY l t rom !;asE I A1A I From South | 1s5TH STREET I From West lll Left BIKES Right peds Left BIKES Right Peds I Left BIKES Right Peds I Left BIKES Rlght Peds DaLe 05/27/r5 ----- 07:00 0 0 0 07:15 0 0 6 0 l12 | lz lL207:30 0 0 0 0 07:45 O O O 1 O 4 O 4 | o O o o I o 2 o 6 | 17 Hr Total 0 0 0708 o 14 1 0 o 040 4 o 16 1 53 31 L9 20 2I 0 0 0 0 0 0 0 0 0 oR:46 o 0 0 11 0 2 0 9l o o 0 2l Tobal 0001 0206 0003 01030001 0 1 0 11 0 0 0 2 o 2 0 6l o 0 o 1 0l 1l 1l ol ol 1l Hr Total 0 3l o 5? | 0 3 o 2 0 20 l -- * BREAK * 91 16:00 0 0 O 2 16115 0 O O 2 15:30 0 0 0 6 L6245 0 0 O 2l 0 0 0 0 2 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 7l 2l L7| 0008 0000 0 0 0 5, 03 07 08 22 11 40 ,10 6l o 0 0 1l Hr Total 0 0 0 12 I 0004 46 | 0 0 o 11 | 0 2 o o 0 19 | o o 0 1 0 8i 0 0 0 o o 14 | o o o 6l 0 1 0 8l 0 1 0 4l l7:00 0 24 1 0 2l 0 1l o el 77:15 0 0 0 6 17:30 0000 L7:45 0 o 0 0 I o 3 o 14 | 0 0 0 2 | 0 3 0 10 I r-00 35 23 32 Hilfotar u 0 0 10 I o s2 i 0 0 14 |o 28 I 115 *TOTAf,*3z I 4s I22 7e I 3s9 %hl ul ,,P[ tffrt"ltl lt ft ll Irnl | | 0r{,rol fllr,,h 1> - Ctrrc{frc.tt}t Sr.nnl 3\es,Flocida- furlL lO,Zo t* Jr^rn b4' .t r^t %lor"\ i no noT<bna-Ll:aal, 185TH STREET & COLLINS AVENUE SUNNY ISLES BEACH, FLORIDA COUMTED BY: SEBASTIAN SALVO SIGNAI,I ZED Traffic survey specialist.s, Inc. 624 Gardenia Terrace Delray Beach, Florida 33444 Phone (551) 272-3255 ALL W/ DAYS DRIVEWAY, TURNBERRY DRIVEWA site Code : 00150110 Start Date: A5/27/1-5 File I.D. : 185S_A1A Page : 1 COLLINS AVENUE From North I DRTVEWAY I trom Easr I I coLLrNs AVENUE l 1 AETU CTDFFT I r rom wesE I UTurn Left Thru Right I UTurn Left. Thru RighE UTurn Left Thru RighE. I UTurn Left Thru Right I Total DaEe 05/21 /15 07:00 07:15 07:30 07 :45 1 0 I 0 1 304 10 03525 23a45 r ao tlf, 09r94 37255 408 919 0000 0102 0010 1l 1 1l 0 0 0 0 s02 576 678 I qlq 51 0 i o 21 6 12 270 1l 7 0 9t 831 Hr Tocal 08:00 08:15 08:30 08:45 4 lsss 251 O 4 1 4 10 44 474 2 4s9 sl 0 o 494 4l 0 4l 3l ol 2l 25 6 7 9 855 961 913 928 3 32 | 2587 3 I 0 0 0 452 3l 0 0 0 0 0 | 11 14 336 0l 2 16 4r2 11 27 8 395 0 0 0 0 2 2 o 497 3l O O o 6l + 10 385 21 0 I 3 1ol 0 1? | o 22 1 0 15 | Hilrotaf 2 1,902 15 0 * BREAK 7 | 44 48 1528 7 0 30 3 64 3658 16:00 1 16:15 4 16:30 2 r 422 0 418 2745t 5 14 466 9 19 620 0 16 o 2'7 o72 1l 2l ol 0145 0003 o404 1l 2l 1l o 14 | 92'1 olsl961 o 14 | 1103 L6:45 2 1 456 2l 0 5 0 6l 5 11 s63 0l o 16 0 12 | tozg Hr Total 9 1?:00 17:15 1?:30 3 1 49r 4l 0 1 438 1 | 10457 1l 21, 51 2100 5 l-4 510 9 14 55s 5 15 5r2 o ss ] 4070 o 20 I 1069 r 17 I 1049 r 22 1048 4 1718 5l 0 10 4 18 |4l 0l 0l ol o 7r 014 08 028 o 2 o sl o 3 o 2l o 1 1 3l L7:45 | 2 434 1 |o o o 3l 3 13 474 2l 0 18 0 20 l 97r Hr ToEal 5 4 ].820 7l 0 6 1 13 |23 56 205r 21 0 68 2 79 | 4]-3'7 *TOTALT 20 I4 6995 <r I 4) |r7 I 194 r445224r996s53 185TH STREET & COLLINS AVENUE SUNNY ISLES BEACH, FLORIDA COUNTED BY: SEBASTIAN SA],VO SIGNALIZED TtslF:^ e1lr1/ai, qha.l -r I dFdou! vu1 uyuera 524 Gardenla Terrace DeLray Beach, Florlda 33444 Phone (561) 272-3255 ALL W/ DAYS DRIVEWAY. TURNBERRY DRIVEWA Site Code : 00150110 start Date: 05/27/15 File I.D. : 185S_A1A Page : 2 COLLINS AVENUE From North J DRIVEWAY From East I 15 IJ lcoLLrNS AVENUE 185TH STREET I From South I From wesE ll uTurn Left Thru Right I uTurn Left Thru Right ] uTurn Left Thru Right I uTurn Left Thru Right I Tot.al DaLe 05/27/L5 ------------- Peak Hour Analysis By EnEire Intersection for the Period: 07:00 to 09:00 on 05/21/L5 Peak start 08:00 | 08:00 Volume 4 2 I9o2 151 0 Percenr ot ot 99t 1* | 0* Pk total 1923 ] 11 HighesE 08 :45 | 08:45 VolumeOO497310 Hi Eoral s00 | 6 PHF .96 | .46 407 3 6t 0t 64t .94 COLLINS AVENUE L,902 0 | 08:00 | 44 4s rs28 7 | 3* 3t 94* o* I 1627 I 08:30 12164L22 | 432 08:00 0 0t 97 08:15 0 29 .84 30 3 64 31* 3t 65t 30 1_ ,528 7 1_ ,902 't o?2 ' I L t taJ 15 .92.0 1, 565 L,528 0 185TH STREET 920 107 15 3,499 | [l'. ALL W/ DAYS DRIVEWA | . TURNBERRY DRTVEWAY | ,"I I 11 0 rl ll lzon2TlnlL'll- g'/ | r.ttersection Total- | - | 3,6s8 | t.ll 30 0 30 o 3 '/ ot 0 64 tlll-I DRIVEWAY 3 ,597 L,62'7 ---t 4 r ,902 o+ L,970 COLLIN 92 AVENUE L,528 185TH STREET & COL],INS AVENUE SUNNY IS],ES BEACH, FLORIDA COUNTED BY: SEBASTIAN SALVO SIGNALIZED Traffj-c Survey SpecialisEs, Inc. 624 Gardenia Terrace nalTAv RFA.h F1nrida 33444 Phone (561) 272-3255 ALL W/ DAYS DRIVEWAY, TURNBERRY DRIVEWA Site Code : 00150110 SEart Date: 05/27/L5 Flle I.D. : 185S_A1A Page : 3 COLLINS AVENUE From NorEh I COLTTTNS AVENUE I Fr^m c^rrfh I | 18srH STREET l from wesr I I DRTVEWAY I From East I u.Iurn Left Thru Right I trfurn Left Thru Righr I u:furn Left. Thru Right I ufurn LefE Thru Righr 'IOLal DaEe 05/27 /15 - -------------- Peak Hour Analysis By Entire Intersection for the Perj-od: 16:00 to 18:00 on 05/27/L5 Peak starE 15:30 Volume 7 3 l-803 Percent 0C 0$ 99t Pk total 1820 Highest 17;00 Volume 3 1 49]. Hi total 499 PHF .91 185TH STREET 50 0 63 0 | 15:30 7l o 14 0 0e | 0r 4sr 0t I Jr I re, +s 4l o s 0 I 11 .70 I 15:30 77 1 2A s8 2248 1 55* lt 2* 96* 0t 2335 | 16:30 51 9 1e 620 1 | 64e | .eo 0 50 0* 44+ 114 17:00 0 14 34 .84 1 63 L* 55t COLLINS AVENUE 1,803 0 50 2 ,248 L1 1, 803 2 ,3L5 | '1 o.^ ' | "r,ozv 4,135 | 4 ,2L5 +, LJ t. ALL w/ DAYS DRTVEWA r- |I TURNBERRY DRTVEWAY | .1llrllr rl | '.0' 43 L II14 | ftrtersection Total| 4,300rlt- i - L r1tr 10 L2 5 0 93 50 I2 214 I2 DR]VEWAY 10 1 1 63 ,,r33ll :: llr'*oll COLLINS . 86.0 t'0 AVENUE Z, ) )5 ---------------- 2 ,248 0 2,248 185TH STREET & COLLINS AVENUE SUNNY ISLES BEACH, FLORIDA COUM|ED BY: SEBASTIAN SALVO SIGNALIZED TrrFFin c,,fl'.\r Cha.i^liafc Tn. 524 Gardenia Terrace nelrav Ppa.h Flnrida 33444 Phone (561) 272-3255 TURNBERRY DRIVEWAY Site Code : 00150110 Start DaEe: 05/27/15 File I.D. : 185S_A1A Page : 1 lLl UTurn Left Thru Right I llfurn Left. Thru Right I UTurn Left Thru Right I UTurn Left Thru Right 2 3 2 COLLINS AVENUE From Nort.h 0 0 0 0 1 0 0 1 I DRTVEWAY | !rom Easr I COLLTNS AVENUE Fr^m e^rrtsh | 1 aqru QTDFFT | !rom wesr Tot.a1 07:00 07:15 07;30 O7 t45 0 0 0 0 o o 2 oJ 0000 0010 0001 0001 0001 ol o o o o ol o o o 1 0l 0 0 1 o ol o o o 1"1 o o o ol o o o o Hilr'otat 0l ol ol ol O8:45 O O O 0 |o00?o o 0 1l 21 0 3l ol ol ol ol 0l 11 08:00 0 2 0 08:15 0 0 0 08:30 0 0 0 o o o o l o o o 2l o 1 o ol o o o ol o o o ol o o 0 1l 0 0 0 0 0 0 0 o 0 0 0 1 4 1 1 5 Hiltotat u ol l 0 3l o o 4l ol 11 15:00 0 1 0 0 16:15 0 1 0 0 15:30 0 0 0 0 0 0 0 0 0 0 0 0 5 51,6t45 0 1 0 0 |0 1 0 3l 0 0l 0 0 0 01 0000 0000 0000 00 01 00 o 1 1 3l o 0 0 3l o 1 o 1l Hr Tot.al 0 3 0 0l 0 3 1 10 |0 1l 0 0 0l 0 0 0 0 ol ol 0l 0l 0 0 0 0 0 0 0 0 0 1 0 0 0l 0 0l 0 18 17:00 0 1 0 17:15 0 1 0 17:30 0 0 0 ol ol ol 1l ol 1l 1l 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 o 0 0 0 0 2 2 2 317:45 O 2 O O I Hr'10Eat u ol ll ol 0l *TOTAL*ol 18 8l ol 185TH STREET & COLLINS AVENUE SUNNY ISLES BEACH, FLORIDA COLNTED BY: SEBASTIAN SALVO SIGNALIZED Trrffi^ qrrrl'ar/ qna.iAl ietq Tn. 624 Gardenia Terrace npl raw PpA.h Fl nrida 33444 Phone (561) 272-3255 PEDESTRIANS site code : 001501"1.0 Start Date: 05/27/3"5 File LD. : 185S_A1A Page : 1 I Left BIKES Right Peds I Left BIKES Right Peds ] Left BrKES Right Peds DaLe 05/2'7/15 -- COL],INS AVENUE From North teft BIKES Right Peds I DRIVEWAY From East I coLLrNs AVENUE I Fr^m q^rrrh I 1 AqTE qTPFFT I From West 0 0 0 0 Total 07:00 0?:15 07:30 07 :45 0 0 0 0 0 0 0 0 0 0 0 0 r9 11 10 0 1 0 2 0 0 0 0 01067 0 1 0 13 0 1 0 15 0 1 0 76 1 o 0 0 13 | o o o 23 l 41 158 c | 44 2l 45 I | )J1 o 4 o r2l o o o 241 Hr aotaa 08:00 08:15 08:30 08:45 44 I 6l 3l 6l 21 22 1 4l 7l sl 23 18 l 11 4l 4l 6l l-l 0 10? | 0 o 135 l L2 | 310 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5 0 2 3 0 0 0 0 0 0 0 o L 0 I o 0 0 0 0 0 0 0 0 1 0 2 1 0 0 0 0 62 26 42 23 Hr aotaf 17 J 6 9 2l 16 |67 1 LO !> l 0001 153 15:00 15:15 16:30 15 :45 0 18 012 0 11 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 00022 00037 1 01023 o o o 14 0007 0002 0006 54 6I 51 ?10 14 | Hr aocaa zo I o 55 |01096r 0 0 0 15 21 1l sl 4l 197 63 36 66 49 17:00 0 0 17:15 0 0 17:30 0 0 0 1 o 18 | 0 1 0 14 I 0 1 0 16 I o 2 0 15 0 3l 0 0l o 10 | 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 3 0 0 0 0 le I rc I 11 | 24 1I'7:45 0 0 0 0 | Hr Total 0 0 0 13 |05464 114 | 1) |2L4 *TOTAL*r00 I 264 |413 | -# tlrtl ll tr h|j ^ I TurG.r{l[31g5 ' T-I------<->2 Do4s ttfiaL "t7r0'$rl lErt*PI Sonn{Ib\es kI^ r Fto( idrr.- Maq 08,zo \+ J**r to3:' L^f,"' P^\qG /ro Eigno.-t.;:.J 8/17/2013 4:53 PM Print Date:Print Time: Asset PH 1 PH 8PH 7PH 6PH 5PH 4PH 2 PH 3 0 0 0 0 0 0 0 0 -SBT -WBT ---EBT Splits 4605 Collins Av&189 St DOW-7 N/A 0 0 0 Max 0N/A Active Maximum Active PhaseBank TOD SettingOffsetCyclePlan #Op Mode TOD ScheduleIntersection TOD Schedule Report for 4605: Collins Av&189 St RedYellowMax 2Max LimitMin InitialDon't WalkWalkPhase Phase Bank 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 Veh Ext 1 0 0 0 0 000----0--000 0 0--000--0000-- 2 0 0 15 4 1015----0--1500 0 0--04040--40111-- 3 0 0 0 0 000----0--000 0 0--000--0000-- 4 7 12 7 4 1127----12--777 20 20--02020--202.5 2.5 2.5-- 5 0 0 0 0 000----0--000 0 0--000--0000-- 6 0 0 0 0 000----0--000 0 0--000--0000-- 7 0 0 0 0 000----0--000 0 0--000--0000-- 8 0 0 7 4 107----0--700 20 20--02020--202.5 2.5 2.5-- unknownLast In Service Date: Permitted Phases 12345678 -2-4---8Default External Permit 0 External Permit 1 External Permit 2 -------- -------- -------- Phase Bank 1Active Phase Bank: - SBT - WBT - - - EBT Cycle Current TOD Schedule Plan Ring Offset Offset Green Time 120 0 90 0 20 0 0 0 20 0 91 120 0 95 0 15 0 0 0 15 0 102 130 0 100 0 20 0 0 0 20 0 1243 120 0 89 0 21 0 0 0 21 0 904 90 0 66 0 14 0 0 0 14 0 186 120 0 91 0 19 0 0 0 19 0 437 110 0 81 0 19 0 0 0 19 0 818 120 0 91 0 19 0 0 0 19 0 519 110 0 81 0 19 0 0 0 19 0 8110 110 0 81 0 19 0 0 0 19 0 8111 165 0 135 0 20 0 0 0 20 0 13712 DOWPlanTime Local TOD Schedule 6 Su M T ThW S0000F Flash Su M T ThW0100 Flash S0200F 6 Su S0630 1 M T ThW0630 F 2 M T ThW1000 F 2 S1000 2 Su1100 12 M T ThW1600 F 4 Su S1700 4 M T ThW2000 F 6 Su M T ThW S2200F 1 2 3 4 5 6 7 8 -SBT -WBT --EBT- Day of WeekSettings *FunctionTime Current Time of Day Function 0000 TOD OUTPUTS --------SuM T W ThF S Day of WeekSettings *FunctionTime Local Time of Day Function TOD OUTPUTS --------SuM T W ThF S0000 7 - X-PED OMIT 6 - EXTERNAL PERMIT 2 5 - EXTERNAL PERMIT 1 4 - Phase Bank 3, Max 2 3 - Phase Bank 3, Max 1 2 - Phase Bank 2, Max 2 1 - Phase Bank 2, Max 1 Blank - Plan - Phase Bank 1, Max 2 Blank - FREE - Phase Bank 1, Max 1 * Settings 8 - TBA No Calendar Defined/Enabled Page 2 of 2 11/25/2013 8:07 AM Print Date:Print Time: Asset PH 1 PH 8PH 7PH 6PH 5PH 4PH 2 PH 3 0 0 0 0 0 0 0 0 NBL SBT --SBL NBT -EBT Splits 3459 Collins Av&185 St DOW-2 N/A 0 0 0 Max 0N/A Active Maximum Active PhaseBank TOD SettingOffsetCyclePlan #Op Mode TOD ScheduleIntersection TOD Schedule Report for 3459: Collins Av&185 St RedYellowMax 2Max LimitMin InitialDon't WalkWalkPhase Phase Bank 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 Veh Ext 1 0 0 5 3 005----0--500 20 10--01010--10222-- 2 0 0 15 4 1015----0--1500 0 61--04061--40111-- 3 0 0 0 0 000----0--000 0 0--000--0000-- 4 0 0 0 0 000----0--000 0 0--000--0000-- 5 0 0 5 3 005----0--500 20 10--01010--10222-- 6 0 0 15 4 1015----0--1500 0 61--04061--40111-- 7 0 0 0 0 000----0--000 0 0--000--0000-- 8 7 20 7 4 1207----20--777 35 26--02526--262.5 2.5 2.5-- unknownLast In Service Date: Permitted Phases 12345678 12--56-8Default External Permit 0 External Permit 1 External Permit 2 -------- -2---6-8 -2---6-8 Phase Bank 1Active Phase Bank: NBL SBT - - SBL NBT - EBT Cycle Current TOD Schedule Plan Ring Offset Offset Green Time 120 10 71 0 0 10 71 0 26 0 291 120 13 68 0 0 13 68 0 26 0 72 130 15 76 0 0 15 76 0 26 0 763 120 15 61 0 0 15 61 0 31 0 14 90 10 41 0 0 10 41 0 26 0 286 120 9 72 0 0 9 72 0 26 0 697 110 9 62 0 0 9 62 0 26 0 238 120 9 72 0 0 9 72 0 26 0 1049 110 9 62 0 0 9 62 0 26 0 2910 110 9 62 0 0 9 62 0 26 0 2911 165 19 107 0 0 15 111 0 26 0 10712 DOWPlanTime Local TOD Schedule 6 Su M T ThW S0000F Free Su0100 Free S0200 6 Su S0630 1 M T ThW0630 F 2 M T ThW1000 F 2 S1000 2 Su1100 12 M T ThW1600 F 4 Su S1700 4 M T ThW2000 F 6 Su M T ThW S2200F 1 2 3 4 5 6 7 8 NBL SBT --SBL -EBTNBT Day of WeekSettings *FunctionTime Current Time of Day Function 0000 TOD OUTPUTS --------SuM T W ThF S Day of WeekSettings *FunctionTime Local Time of Day Function TOD OUTPUTS --------SuM T W ThF S0000 TOD OUTPUTS -------1 Su0100 TOD OUTPUTS -------1 S0200 TOD OUTPUTS --------Su S0630 7 - X-PED OMIT 6 - EXTERNAL PERMIT 2 5 - EXTERNAL PERMIT 1 4 - Phase Bank 3, Max 2 3 - Phase Bank 3, Max 1 2 - Phase Bank 2, Max 2 1 - Phase Bank 2, Max 1 Blank - Plan - Phase Bank 1, Max 2 Blank - FREE - Phase Bank 1, Max 1 * Settings 8 - TBA No Calendar Defined/Enabled Page 2 of 2 8/17/2013 4:53 PM Print Date:Print Time: Asset PH 1 PH 8PH 7PH 6PH 5PH 4PH 2 PH 3 0 0 0 0 0 0 0 0 -SBT EBT WBR SBL NBT WBT - Splits 4606 Collins Av&SR- 856 DOW-7 N/A 0 0 0 Max 0N/A Active Maximum Active PhaseBank TOD SettingOffsetCyclePlan #Op Mode TOD ScheduleIntersection TOD Schedule Report for 4606: Collins Av&SR- 856 RedYellowMax 2Max LimitMin InitialDon't WalkWalkPhase Phase Bank 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 Veh Ext 1 0 0 0 0 000----0--000 0 0--000--0000-- 2 0 0 15 4 3.1015----0--1500 0 30--04030--40111-- 3 7 10 7 4 2.4107----10--777 35 25--02525--252.5 2.5 2.5-- 4 0 0 7 4 0.107----0--700 30 10--01710--172.5 2.5 2.5-- 5 7 10 7 3 0107----10--777 20 8--0148--14222-- 6 0 0 15 4 3.1015----0--1500 0 30--04030--40111-- 7 7 10 7 4 2.4107----10--777 35 25--02525--252.5 2.5 2.5-- 8 0 0 0 0 000----0--000 0 0--000--0000-- unknownLast In Service Date: Permitted Phases 12345678 -234567-Default External Permit 0 External Permit 1 External Permit 2 -------- -------- -------- Phase Bank 1Active Phase Bank: - SBT EBT WBR SBL NBT WBT - Cycle Current TOD Schedule Plan Ring Offset Offset Green Time 120 0 62 31 10 9 50 31 0 0 931 120 0 63 30 10 7 53 30 0 0 762 130 0 64 39 10 11 50 39 0 0 1063 120 0 65 28 10 11 51 28 0 0 524 90 0 39 24 10 9 27 24 0 0 776 120 0 72 24 7 18 51 24 0 0 257 110 0 62 24 7 18 41 24 0 0 738 120 0 70 26 7 18 49 26 0 0 189 110 0 62 24 7 18 41 24 0 0 7310 110 0 62 24 7 18 41 24 0 0 7311 165 0 99 39 10 11 85 39 0 0 13512 DOWPlanTime Local TOD Schedule 6 Su M T ThW S0000F Free Su0100 Free S0200 6 Su S0630 1 M T ThW0630 F 2 M T ThW1000 F 2 S1000 2 Su1100 12 M T ThW1600 F 4 Su S1700 4 M T ThW2000 F 6 Su M T ThW S2200F 1 2 3 4 5 6 7 8 -SBT EBT WBR SBL WBT -NBT Day of WeekSettings *FunctionTime Current Time of Day Function 0000 TOD OUTPUTS --------SuM T W ThF S 0200 TOD OUTPUTS -------1 S 0630 TOD OUTPUTS --------Su S Day of WeekSettings *FunctionTime Local Time of Day Function TOD OUTPUTS --------SuM T W ThF S0000 TOD OUTPUTS -------1 Su0100 TOD OUTPUTS -------1 S0200 TOD OUTPUTS --------Su S0630 7 - X-PED OMIT 6 - EXTERNAL PERMIT 2 5 - EXTERNAL PERMIT 1 4 - Phase Bank 3, Max 2 3 - Phase Bank 3, Max 1 2 - Phase Bank 2, Max 2 1 - Phase Bank 2, Max 1 Blank - Plan - Phase Bank 1, Max 2 Blank - FREE - Phase Bank 1, Max 1 * Settings 8 - TBA No Calendar Defined/Enabled Page 2 of 2 Appendix C Intersection Capacity Analysis Worksheets Existing Conditions Timings 15158 Existing AM 1: Collins Avenue & 185th Street 6/8/2015 Varadero 5/27/2015 15158 Existing AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 28 0 49 4 1 6 28 47 1237 6 6 1780 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.92 0.95 0.95 0.95 0.95 0.95 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot Prot NA Prot NA Protected Phases 4 8 5 5 2 1 6 Permitted Phases 4 8 Detector Phase 4 4 8 8 5 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 9.5 9.5 23.0 9.5 23.0 Total Split (s) 31.0 31.0 31.0 31.0 13.0 13.0 76.0 13.0 76.0 Total Split (%) 25.8% 25.8% 25.8% 25.8% 10.8% 10.8% 63.3% 10.8% 63.3% Yellow Time (s) 4.0 4.0 4.0 4.0 3.0 3.0 4.0 3.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 0.0 1.0 0.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 3.0 5.0 3.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Act Effct Green (s) 7.8 7.8 7.8 8.9 63.6 6.4 56.2 Actuated g/C Ratio 0.10 0.10 0.10 0.11 0.81 0.08 0.72 v/c Ratio 0.21 0.21 0.07 0.39 0.32 0.04 0.52 Control Delay 42.7 3.5 30.4 44.4 3.3 42.3 8.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 42.7 3.5 30.4 44.4 3.3 42.3 8.1 LOS D A C D A D A Approach Delay 17.5 30.4 5.6 8.2 Approach LOS B C A A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 78.2 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.52 Intersection Signal Delay: 7.4 Intersection LOS: A Intersection Capacity Utilization 55.0% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 1: Collins Avenue & 185th Street Timings 15158 Existing AM 1: Collins Avenue & 185th Street 6/8/2015 Varadero 5/27/2015 15158 Existing AM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 21 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.95 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Timings 15158 Existing PM 1: Collins Avenue & 185th Street 6/9/2015 Varadero 5/27/2015 15158 Existing PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 72 0 69 8 3 16 23 55 2138 3 11 1822 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot Prot NA Prot NA Protected Phases 4 8 5 5 2 1 6 Permitted Phases 4 8 Detector Phase 4 4 8 8 5 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 9.5 9.5 23.0 9.5 23.0 Total Split (s) 31.0 31.0 31.0 31.0 15.0 15.0 112.0 22.0 119.0 Total Split (%) 18.8% 18.8% 18.8% 18.8% 9.1% 9.1% 67.9% 13.3% 72.1% Yellow Time (s) 4.0 4.0 4.0 4.0 2.0 2.0 4.0 3.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 0.0 1.0 0.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 2.0 5.0 3.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Act Effct Green (s) 11.4 11.4 11.4 10.2 67.5 6.5 59.1 Actuated g/C Ratio 0.13 0.13 0.13 0.11 0.74 0.07 0.65 v/c Ratio 0.43 0.25 0.13 0.41 0.59 0.09 0.57 Control Delay 49.6 5.8 27.1 50.1 6.8 51.0 10.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 49.6 5.8 27.1 50.1 6.8 51.0 10.5 LOS D A C D A D B Approach Delay 28.2 27.1 8.3 10.8 Approach LOS C C A B Intersection Summary Cycle Length: 165 Actuated Cycle Length: 91 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.59 Intersection Signal Delay: 10.2 Intersection LOS: B Intersection Capacity Utilization 67.9% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 1: Collins Avenue & 185th Street Timings 15158 Existing PM 1: Collins Avenue & 185th Street 6/9/2015 Varadero 5/27/2015 15158 Existing PM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.97 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary HCM 2010 TWSC 15158 Existing AM 2: Collins Avenue & 186th Street 6/8/2015 Varadero 5/27/2015 15158 Existing AM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.5 Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 4 0 9 7 0 16 2 8 1242 14 16 6 1805 14 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None Storage Length 0 - 0 - - - - 150 - - - 220 - - Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 - Grade, % - 0 - - 0 - - - 0 - - - 0 - Peak Hour Factor 97 97 97 97 97 97 92 97 97 97 92 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 0 9 7 0 16 2 8 1280 14 17 6 1861 14 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2448 3231 938 2099 3230 647 1378 1875 0 0 962 1295 0 0 Stage 1 1915 1915 - 1308 1308 - - - - - - - - - Stage 2 533 1316 - 791 1922 - - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 33 9 228 55 9 355 270 145 - - 461 281 - - Stage 1 44 114 - 121 228 - - - - - - - - - Stage 2 455 226 - 317 113 - - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 31 9 228 53 9 355 160 160 - - 383 383 - - Mov Cap-2 Maneuver 31 9 - 53 9 - - - - - - - - - Stage 1 44 114 - 121 228 - - - - - - - - - Stage 2 434 226 - 304 113 - - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 57.4 38.8 HCM LOS F E Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 160 - - 31 228 130 383 - - HCM Lane V/C Ratio 0.065 - - 0.133 0.041 0.182 0.062 - - HCM Control Delay (s) 29.1 - - 138.2 21.5 38.8 15 - - HCM Lane LOS D - - F C E C - - HCM 95th %tile Q(veh) 0 - - 0 0 1 0 - - HCM 2010 TWSC 15158 Existing PM 2: Collins Avenue & 186th Street 6/9/2015 Varadero 5/27/2015 15158 Existing PM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 5 0 12 4 0 15 7 16 2199 12 31 6 1839 6 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None Storage Length 0 - 0 - - - - 150 - - - 220 - - Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 - Grade, % - 0 - - 0 - - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 0 12 4 0 15 7 16 2244 12 32 6 1877 6 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2899 4258 941 3123 4255 1128 1387 1883 0 0 1662 2256 0 0 Stage 1 1955 1955 - 2297 2297 - - - - - - - - - Stage 2 944 2303 - 826 1958 - - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 17 2 227 12 2 170 267 143 - - 187 93 - - Stage 1 42 109 - 23 73 - - - - - - - - - Stage 2 255 72 - 301 108 - - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 15 2 227 11 2 170 165 165 - - 151 151 - - Mov Cap-2 Maneuver 15 2 - 11 2 - - - - - - - - - Stage 1 42 109 - 23 73 - - - - - - - - - Stage 2 232 72 - 285 108 - - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 115.1 149.8 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 165 - - 15 227 42 151 - - HCM Lane V/C Ratio 0.142 - - 0.34 0.054 0.462 0.25 - - HCM Control Delay (s) 30.4 - - $ 339 21.8 149.8 36.7 - - HCM Lane LOS D - - F C F E - - HCM 95th %tile Q(veh) 0 - - 1 0 2 1 - - HCM 2010 TWSC 15158 Existing AM 3: Collins Avenue & 188th Block 6/8/2015 Varadero 5/27/2015 15158 Existing AM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 0 0 2 1 0 3 0 1242 0 74 1 1796 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized - - None - - None - - None - - - None Storage Length - - - - - - - - - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 - Grade, % - 0 - - 0 - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 92 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 2 1 0 3 0 1267 0 80 1 1833 17 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2511 3271 925 2163 3280 634 1850 0 0 928 1267 0 0 Stage 1 2004 2004 - 1267 1267 - - - - - - - - Stage 2 507 1267 - 896 2013 - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 30 9 233 50 9 362 149 - - 482 290 - - Stage 1 38 103 - 129 238 - - - - - - - - Stage 2 472 238 - 273 102 - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 30 9 233 50 9 362 149 - - 474 474 - - Mov Cap-2 Maneuver 30 9 - 50 9 - - - - - - - - Stage 1 38 103 - 129 238 - - - - - - - - Stage 2 468 238 - 271 102 - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 20.6 31.3 HCM LOS C D Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 149 - - 233 141 474 - - HCM Lane V/C Ratio - - - 0.009 0.029 0.172 - - HCM Control Delay (s) 0 - - 20.6 31.3 14.2 - - HCM Lane LOS A - - C D B - - HCM 95th %tile Q(veh) 0 - - 0 0 1 - - HCM 2010 TWSC 15158 Existing PM 3: Collins Avenue & 188th Block 6/9/2015 Varadero 5/27/2015 15158 Existing PM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 1 0 10 0 0 5 0 2244 2 89 1 1825 33 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized - - None - - None - - None - - - None Storage Length - - - - - - - - - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 - Grade, % - 0 - - 0 - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 92 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 1 0 10 0 0 5 0 2290 2 97 1 1862 34 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2991 4367 948 3231 4382 1146 1896 0 0 1678 2292 0 0 Stage 1 2075 2075 - 2291 2291 - - - - - - - - Stage 2 916 2292 - 940 2091 - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 15 2 225 10 2 166 141 - - 183 89 - - Stage 1 34 94 - 24 73 - - - - - - - - Stage 2 265 73 - 256 93 - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 15 2 225 10 2 166 141 - - 175 175 - - Mov Cap-2 Maneuver 15 2 - 10 2 - - - - - - - - Stage 1 34 94 - 24 73 - - - - - - - - Stage 2 257 73 - 244 93 - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 46 27.4 HCM LOS E D Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 141 - - 99 166 175 - - HCM Lane V/C Ratio - - - 0.113 0.031 0.559 - - HCM Control Delay (s) 0 - - 46 27.4 48.8 - - HCM Lane LOS A - - E D E - - HCM 95th %tile Q(veh) 0 - - 0 0 3 - - Timings 15158 Existing AM 4: 189th Street & Collins Avenue 6/8/2015 Varadero 5/27/2015 15158 Existing AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 0 0 43 11 11 0 0 0 0 0 1862 32 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm Prot NA NA Protected Phases 3 8 6 Permitted Phases 8 Detector Phase 8 3 8 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 25.0 95.0 Total Split (%) 20.8% 20.8% 20.8%79.2% Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min Max Act Effct Green (s) 13.8 13.8 90.4 Actuated g/C Ratio 0.12 0.12 0.79 v/c Ratio 0.21 0.10 0.40 Control Delay 23.1 22.5 4.4 Queue Delay 0.0 0.0 0.0 Total Delay 23.1 22.5 4.4 LOS C C A Approach Delay 22.5 4.4 Approach LOS C A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 114.2 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.40 Intersection Signal Delay: 5.1 Intersection LOS: A Intersection Capacity Utilization 48.3% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: 189th Street & Collins Avenue Timings 15158 Existing PM 4: 189th Street & Collins Avenue 6/9/2015 Varadero 5/27/2015 15158 Existing PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 0 0 42 30 12 0 0 0 0 0 1884 42 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm Prot NA NA Protected Phases 3 8 6 Permitted Phases 8 Detector Phase 8 3 8 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 25.0 140.0 Total Split (%) 15.2% 15.2% 15.2%84.8% Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min Max Act Effct Green (s) 13.9 13.9 135.3 Actuated g/C Ratio 0.09 0.09 0.85 v/c Ratio 0.23 0.23 0.36 Control Delay 17.4 30.9 3.2 Queue Delay 0.0 0.0 0.0 Total Delay 17.4 30.9 3.2 LOS B C A Approach Delay 30.9 3.2 Approach LOS C A Intersection Summary Cycle Length: 165 Actuated Cycle Length: 159.2 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.36 Intersection Signal Delay: 4.0 Intersection LOS: A Intersection Capacity Utilization 48.8% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: 189th Street & Collins Avenue Timings 15158 Existing AM 5: Collins Avenue & William Lehman Cswy SR856 6/8/2015 Varadero 5/27/2015 15158 Existing AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 291 0 0 18 0 5 42 0 434 14 13 863 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Prot Free Prot Prot Perm NA Prot NA Protected Phases 3 3 4 2 1 6 Permitted Phases Free 2 Detector Phase 3 3 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 11.0 11.0 10.0 25.0 25.0 9.5 25.0 Total Split (s) 37.0 37.0 14.0 57.0 57.0 12.0 69.0 Total Split (%) 30.8% 30.8% 11.7% 47.5% 47.5% 10.0% 57.5% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 3.0 4.0 All-Red Time (s) 2.0 2.0 1.0 3.0 3.0 0.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 5.0 7.0 7.0 3.0 7.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None Max Max None Max Act Effct Green (s) 13.2 13.2 5.5 60.5 60.5 6.3 62.4 Actuated g/C Ratio 0.15 0.15 0.06 0.67 0.67 0.07 0.69 v/c Ratio 0.60 0.07 0.02 0.11 0.20 0.11 0.37 Control Delay 42.0 34.7 0.2 9.6 7.6 43.9 7.2 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 42.0 34.7 0.2 9.6 7.6 43.9 7.2 LOS D C A A A D A Approach Delay 7.8 7.7 Approach LOS A A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 90.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.60 Intersection Signal Delay: 13.9 Intersection LOS: B Intersection Capacity Utilization 53.0% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 5: Collins Avenue & William Lehman Cswy SR856 Timings 15158 Existing PM 5: Collins Avenue & William Lehman Cswy SR856 6/9/2015 Varadero 5/27/2015 15158 Existing PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 492 0 0 15 0 8 46 0 1002 17 22 712 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Prot Free Prot Prot Perm NA Prot NA Protected Phases 3 3 4 2 1 6 Permitted Phases Free 2 Detector Phase 3 3 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 11.0 11.0 10.0 25.0 25.0 9.5 25.0 Total Split (s) 45.0 45.0 14.0 92.0 92.0 14.0 106.0 Total Split (%) 27.3% 27.3% 8.5% 55.8% 55.8% 8.5% 64.2% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 3.0 4.0 All-Red Time (s) 2.0 2.0 0.0 3.0 3.0 0.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 4.0 7.0 7.0 3.0 7.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None Max Max None Max Act Effct Green (s) 27.6 27.6 5.5 92.7 92.7 7.5 99.4 Actuated g/C Ratio 0.19 0.19 0.04 0.65 0.65 0.05 0.70 v/c Ratio 0.80 0.05 0.06 0.11 0.48 0.26 0.31 Control Delay 64.3 46.5 0.9 13.9 15.3 73.6 9.4 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.3 46.5 0.9 13.9 15.3 73.6 9.4 LOS E D A B B E A Approach Delay 15.3 11.3 Approach LOS B B Intersection Summary Cycle Length: 165 Actuated Cycle Length: 141.7 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 24.6 Intersection LOS: C Intersection Capacity Utilization 60.6% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 5: Collins Avenue & William Lehman Cswy SR856 Future without Project Timings 15158 Future without Project AM 1: Collins Avenue & 185th Street 9/21/2015 Varadero 9/21/2015 15158 Future without Project AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 28 0 49 4 1 6 28 47 1393 6 11 2055 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.92 0.95 0.95 0.95 0.95 0.95 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot Prot NA Prot NA Protected Phases 4 8 5 5 2 1 6 Permitted Phases 4 8 Detector Phase 4 4 8 8 5 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 9.5 9.5 23.0 9.5 23.0 Total Split (s) 31.0 31.0 31.0 31.0 13.0 13.0 76.0 13.0 76.0 Total Split (%) 25.8% 25.8% 25.8% 25.8% 10.8% 10.8% 63.3% 10.8% 63.3% Yellow Time (s) 4.0 4.0 4.0 4.0 3.0 3.0 4.0 3.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 0.0 1.0 0.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 3.0 5.0 3.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Act Effct Green (s) 7.8 7.8 7.8 9.1 75.1 6.6 67.8 Actuated g/C Ratio 0.09 0.09 0.09 0.10 0.83 0.07 0.75 v/c Ratio 0.24 0.24 0.08 0.44 0.35 0.09 0.57 Control Delay 48.6 5.0 32.9 51.8 3.3 46.6 8.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 48.6 5.0 32.9 51.8 3.3 46.6 8.1 LOS D A C D A D A Approach Delay 20.6 32.9 5.7 8.3 Approach LOS C C A A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 90.1 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.57 Intersection Signal Delay: 7.6 Intersection LOS: A Intersection Capacity Utilization 60.3% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: Collins Avenue & 185th Street Timings 15158 Future without Project AM 1: Collins Avenue & 185th Street 9/21/2015 Varadero 9/21/2015 15158 Future without Project AM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 21 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.95 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Timings 15158 Future without Project PM 1: Collins Avenue & 185th Street 9/21/2015 Varadero 9/21/2015 15158 Future without Project PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 73 0 70 8 3 16 23 55 2558 3 30 2123 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot Prot NA Prot NA Protected Phases 4 8 5 5 2 1 6 Permitted Phases 4 8 Detector Phase 4 4 8 8 5 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 9.5 9.5 23.0 9.5 23.0 Total Split (s) 31.0 31.0 31.0 31.0 15.0 15.0 112.0 22.0 119.0 Total Split (%) 18.8% 18.8% 18.8% 18.8% 9.1% 9.1% 67.9% 13.3% 72.1% Yellow Time (s) 4.0 4.0 4.0 4.0 2.0 2.0 4.0 3.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 0.0 1.0 0.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 2.0 5.0 3.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Act Effct Green (s) 12.9 12.9 12.9 10.9 95.2 8.0 88.6 Actuated g/C Ratio 0.10 0.10 0.10 0.09 0.76 0.06 0.71 v/c Ratio 0.53 0.30 0.15 0.52 0.68 0.27 0.61 Control Delay 72.2 9.8 35.5 73.4 9.7 69.7 10.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 72.2 9.8 35.5 73.4 9.7 69.7 10.3 LOS E A D E A E B Approach Delay 41.6 35.5 11.6 11.2 Approach LOS D D B B Intersection Summary Cycle Length: 165 Actuated Cycle Length: 125 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.68 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 76.0% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: Collins Avenue & 185th Street Timings 15158 Future without Project PM 1: Collins Avenue & 185th Street 9/21/2015 Varadero 9/21/2015 15158 Future without Project PM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.97 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary HCM 2010 TWSC 15158 Future without Project AM 2: Collins Avenue & 186th Street 9/21/2015 Varadero 9/21/2015 15158 Future without Project AM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.9 Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 4 0 15 7 0 16 2 33 1459 14 16 6 2063 14 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None Storage Length 0 - 0 - - - - 150 - - - 220 - - Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 - Grade, % - 0 - - 0 - - - 0 - - - 0 - Peak Hour Factor 97 97 97 97 97 97 92 97 97 97 92 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 0 15 7 0 16 2 34 1504 14 17 6 2127 14 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2855 3772 1071 2482 3772 759 1579 2141 0 0 1125 1519 0 0 Stage 1 2181 2181 - 1584 1584 - - - - - - - - - Stage 2 674 1591 - 898 2188 - - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 18 4 186 32 4 300 208 106 - - 374 218 - - Stage 1 28 83 - 77 167 - - - - - - - - - Stage 2 374 166 - 272 83 - - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 17 4 186 29 4 300 109 109 - - 304 304 - - Mov Cap-2 Maneuver 17 4 - 29 4 - - - - - - - - - Stage 1 28 83 - 77 167 - - - - - - - - - Stage 2 353 166 - 249 83 - - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 78.4 70.2 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 109 - - 17 186 78 304 - - HCM Lane V/C Ratio 0.332 - - 0.243 0.083 0.304 0.078 - - HCM Control Delay (s) 53.7 - - 274.7 26.1 70.2 17.8 - - HCM Lane LOS F - - F D F C - - HCM 95th %tile Q(veh) 1 - - 1 0 1 0 - - HCM 2010 TWSC 15158 Future without Project PM 2: Collins Avenue & 186th Street 9/21/2015 Varadero 9/21/2015 15158 Future without Project PM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 3.3 Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 5 0 25 4 0 15 7 40 2598 12 31 6 2159 6 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None Storage Length 0 - 0 - - - - 150 - - - 220 - - Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 - Grade, % - 0 - - 0 - - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 0 26 4 0 15 7 41 2651 12 32 6 2203 6 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 3438 5041 1105 3710 5038 1332 1638 2209 0 0 1959 2663 0 0 Stage 1 2282 2282 - 2753 2753 - - - - - - - - - Stage 2 1156 2759 - 957 2285 - - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 8 1 176 5 1 124 193 98 - - 127 57 - - Stage 1 24 74 - 11 42 - - - - - - - - - Stage 2 188 41 - 250 74 - - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 7 1 176 ~ 4 1 124 104 104 - - 97 97 - - Mov Cap-2 Maneuver 7 1 - ~ 4 1 - - - - - - - - - Stage 1 24 74 - 11 42 - - - - - - - - - Stage 2 165 41 - 214 74 - - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 169.7 $ 579.5 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 104 - - 7 176 17 97 - - HCM Lane V/C Ratio 0.461 - - 0.729 0.145 1.14 0.389 - - HCM Control Delay (s) 65.9 - -$ 873.5 28.9$ 579.5 64.2 - - HCM Lane LOS F - - F D F F - - HCM 95th %tile Q(veh) 2 - - 1 0 3 2 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 2010 TWSC 15158 Future without Project AM 3: Collins Avenue & 188th Block 9/21/2015 Varadero 9/21/2015 15158 Future without Project AM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 0 0 2 1 0 3 0 1438 0 75 9 2033 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized - - None - - None - - None - - - None Storage Length - - - - - - - - - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 - Grade, % - 0 - - 0 - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 92 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 2 1 0 3 0 1467 0 82 9 2074 17 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2852 3732 1046 2478 3740 734 2092 0 0 1074 1467 0 0 Stage 1 2265 2265 - 1467 1467 - - - - - - - - Stage 2 587 1467 - 1011 2273 - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 18 4 193 32 4 311 112 - - 400 231 - - Stage 1 25 75 - 93 190 - - - - - - - - Stage 2 422 190 - 231 75 - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 18 4 193 32 4 311 112 - - 369 369 - - Mov Cap-2 Maneuver 18 4 - 32 4 - - - - - - - - Stage 1 25 75 - 93 190 - - - - - - - - Stage 2 418 190 - 229 75 - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 23.9 43.3 HCM LOS C E Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 112 - - 193 98 369 - - HCM Lane V/C Ratio - - - 0.011 0.042 0.246 - - HCM Control Delay (s) 0 - - 23.9 43.3 17.9 - - HCM Lane LOS A - - C E C - - HCM 95th %tile Q(veh) 0 - - 0 0 1 - - HCM 2010 TWSC 15158 Future without Project PM 3: Collins Avenue & 188th Block 9/21/2015 Varadero 9/21/2015 15158 Future without Project PM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 1 0 10 0 0 5 0 2634 2 90 5 2136 33 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized - - None - - None - - None - - - None Storage Length - - - - - - - - - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 - Grade, % - 0 - - 0 - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 92 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 1 0 10 0 0 5 0 2688 2 98 5 2180 34 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 3477 5092 1107 3767 5108 1345 2213 0 0 1969 2690 0 0 Stage 1 2402 2402 - 2689 2689 - - - - - - - - Stage 2 1075 2690 - 1078 2419 - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 7 0 176 5 0 121 97 - - 125 55 - - Stage 1 19 64 - 12 45 - - - - - - - - Stage 2 211 45 - 210 63 - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 7 0 176 5 0 121 97 - - 113 113 - - Mov Cap-2 Maneuver 7 0 - 5 0 - - - - - - - - Stage 1 19 64 - 12 45 - - - - - - - - Stage 2 202 45 - 198 63 - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 86.5 36.1 HCM LOS F E Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 97 - - 55 121 113 - - HCM Lane V/C Ratio - - - 0.204 0.042 0.911 - - HCM Control Delay (s) 0 - - 86.5 36.1 131.8 - - HCM Lane LOS A - - F E F - - HCM 95th %tile Q(veh) 0 - - 1 0 6 - - Timings 15158 Future without Project AM 4: 189th Street & Collins Avenue 9/21/2015 Varadero 9/21/2015 15158 Future without Project AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 0 0 43 14 11 0 0 0 0 0 2092 35 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm Prot NA NA Protected Phases 3 8 6 Permitted Phases 8 Detector Phase 8 3 8 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 25.0 95.0 Total Split (%) 20.8% 20.8% 20.8%79.2% Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min Max Act Effct Green (s) 13.9 13.9 90.4 Actuated g/C Ratio 0.12 0.12 0.79 v/c Ratio 0.22 0.11 0.45 Control Delay 31.4 24.2 4.8 Queue Delay 0.0 0.0 0.0 Total Delay 31.4 24.2 4.8 LOS C C A Approach Delay 24.2 4.8 Approach LOS C A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 114.3 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.45 Intersection Signal Delay: 5.5 Intersection LOS: A Intersection Capacity Utilization 51.7% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: 189th Street & Collins Avenue Timings 15158 Future without Project PM 4: 189th Street & Collins Avenue 9/21/2015 Varadero 9/21/2015 15158 Future without Project PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 0 0 42 36 12 0 0 0 0 0 2192 49 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm Prot NA NA Protected Phases 3 8 6 Permitted Phases 8 Detector Phase 8 3 8 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 25.0 140.0 Total Split (%) 15.2% 15.2% 15.2%84.8% Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min Max Act Effct Green (s) 16.9 16.9 135.2 Actuated g/C Ratio 0.10 0.10 0.83 v/c Ratio 0.22 0.23 0.43 Control Delay 34.3 37.6 4.0 Queue Delay 0.0 0.0 0.0 Total Delay 34.3 37.6 4.0 LOS C D A Approach Delay 37.6 4.0 Approach LOS D A Intersection Summary Cycle Length: 165 Actuated Cycle Length: 162.1 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.43 Intersection Signal Delay: 5.3 Intersection LOS: A Intersection Capacity Utilization 53.4% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: 189th Street & Collins Avenue Timings 15158 Future without Project AM 5: Collins Avenue & William Lehman Cswy SR856 9/21/2015 Varadero 9/21/2015 15158 Future without Project AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 294 0 0 18 0 5 43 0 519 14 13 964 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Prot Free Prot Prot Perm NA Prot NA Protected Phases 3 3 4 2 1 6 Permitted Phases Free 2 Detector Phase 3 3 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 11.0 11.0 10.0 25.0 25.0 9.5 25.0 Total Split (s) 37.0 37.0 14.0 57.0 57.0 12.0 69.0 Total Split (%) 30.8% 30.8% 11.7% 47.5% 47.5% 10.0% 57.5% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 3.0 4.0 All-Red Time (s) 2.0 2.0 1.0 3.0 3.0 0.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 5.0 7.0 7.0 3.0 7.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None Max Max None Max Act Effct Green (s) 13.3 13.3 5.5 60.5 60.5 6.3 62.3 Actuated g/C Ratio 0.15 0.15 0.06 0.67 0.67 0.07 0.69 v/c Ratio 0.61 0.07 0.02 0.13 0.24 0.11 0.41 Control Delay 42.0 34.7 0.2 10.1 7.8 43.9 7.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 42.0 34.7 0.2 10.1 7.8 43.9 7.6 LOS D C A B A D A Approach Delay 8.0 8.1 Approach LOS A A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 90.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 13.6 Intersection LOS: B Intersection Capacity Utilization 55.0% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 5: Collins Avenue & William Lehman Cswy SR856 Timings 15158 Future without Project AM 5: Collins Avenue & William Lehman Cswy SR856 9/21/2015 Varadero 9/21/2015 15158 Future without Project AM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 0 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.96 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Timings 15158 Future without Project PM 5: Collins Avenue & William Lehman Cswy SR856 9/21/2015 Varadero 9/21/2015 15158 Future without Project PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 497 0 0 15 0 8 49 0 1146 17 22 973 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Prot Free Prot Prot Perm NA Prot NA Protected Phases 3 3 4 2 1 6 Permitted Phases Free 2 Detector Phase 3 3 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 11.0 11.0 10.0 25.0 25.0 9.5 25.0 Total Split (s) 45.0 45.0 14.0 92.0 92.0 14.0 106.0 Total Split (%) 27.3% 27.3% 8.5% 55.8% 55.8% 8.5% 64.2% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 3.0 4.0 All-Red Time (s) 2.0 2.0 0.0 3.0 3.0 0.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 4.0 7.0 7.0 3.0 7.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None Max Max None Max Act Effct Green (s) 27.8 27.8 5.5 92.6 92.6 7.5 99.4 Actuated g/C Ratio 0.20 0.20 0.04 0.65 0.65 0.05 0.70 v/c Ratio 0.80 0.05 0.06 0.17 0.55 0.26 0.43 Control Delay 64.4 46.4 0.9 15.5 16.7 73.8 10.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.4 46.4 0.9 15.5 16.7 73.8 10.7 LOS E D A B B E B Approach Delay 16.6 12.1 Approach LOS B B Intersection Summary Cycle Length: 165 Actuated Cycle Length: 141.9 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 23.8 Intersection LOS: C Intersection Capacity Utilization 64.7% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 5: Collins Avenue & William Lehman Cswy SR856 Timings 15158 Future without Project PM 5: Collins Avenue & William Lehman Cswy SR856 9/21/2015 Varadero 9/21/2015 15158 Future without Project PM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 0 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.92 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Future with Project Timings 15158 Future with Project AM 1: Collins Avenue & 185th Street 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 28 0 49 4 1 6 28 47 1382 6 11 2092 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.92 0.95 0.95 0.95 0.95 0.95 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot Prot NA Prot NA Protected Phases 4 8 5 5 2 1 6 Permitted Phases 4 8 Detector Phase 4 4 8 8 5 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 9.5 9.5 23.0 9.5 23.0 Total Split (s) 31.0 31.0 31.0 31.0 13.0 13.0 76.0 13.0 76.0 Total Split (%) 25.8% 25.8% 25.8% 25.8% 10.8% 10.8% 63.3% 10.8% 63.3% Yellow Time (s) 4.0 4.0 4.0 4.0 3.0 3.0 4.0 3.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 0.0 1.0 0.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 3.0 5.0 3.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Act Effct Green (s) 7.8 7.8 7.8 9.1 76.4 6.6 69.1 Actuated g/C Ratio 0.09 0.09 0.09 0.10 0.84 0.07 0.76 v/c Ratio 0.24 0.24 0.08 0.45 0.34 0.09 0.58 Control Delay 49.0 5.2 33.1 52.6 3.2 47.0 8.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 49.0 5.2 33.1 52.6 3.2 47.0 8.1 LOS D A C D A D A Approach Delay 20.9 33.1 5.8 8.3 Approach LOS C C A A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 91.4 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.58 Intersection Signal Delay: 7.6 Intersection LOS: A Intersection Capacity Utilization 61.0% ICU Level of Service B Analysis Period (min) 15 Splits and Phases: 1: Collins Avenue & 185th Street Timings 15158 Future with Project AM 1: Collins Avenue & 185th Street 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 21 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.95 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Timings 15158 Future with Project PM 1: Collins Avenue & 185th Street 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 73 0 70 8 3 16 23 56 2577 3 30 2121 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm NA Perm NA Prot Prot NA Prot NA Protected Phases 4 8 5 5 2 1 6 Permitted Phases 4 8 Detector Phase 4 4 8 8 5 5 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 9.5 9.5 23.0 9.5 23.0 Total Split (s) 31.0 31.0 31.0 31.0 15.0 15.0 112.0 22.0 119.0 Total Split (%) 18.8% 18.8% 18.8% 18.8% 9.1% 9.1% 67.9% 13.3% 72.1% Yellow Time (s) 4.0 4.0 4.0 4.0 2.0 2.0 4.0 3.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 0.0 0.0 1.0 0.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 2.0 5.0 3.0 5.0 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize?Yes Yes Yes Yes Yes Recall Mode None None None None None None Min None Min Act Effct Green (s) 12.9 12.9 12.9 11.0 95.9 8.0 89.3 Actuated g/C Ratio 0.10 0.10 0.10 0.09 0.76 0.06 0.71 v/c Ratio 0.53 0.30 0.16 0.53 0.69 0.28 0.61 Control Delay 72.6 9.8 35.3 73.8 9.8 69.8 10.3 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 72.6 9.8 35.3 73.8 9.8 69.8 10.3 LOS E A D E A E B Approach Delay 41.9 35.3 11.7 11.1 Approach LOS D D B B Intersection Summary Cycle Length: 165 Actuated Cycle Length: 125.7 Natural Cycle: 80 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.69 Intersection Signal Delay: 12.4 Intersection LOS: B Intersection Capacity Utilization 76.4% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: Collins Avenue & 185th Street Timings 15158 Future with Project PM 1: Collins Avenue & 185th Street 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 6 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.97 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary HCM 2010 TWSC 15158 Future with Project AM 2: Collins Avenue & 186th Street 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.9 Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 4 0 15 7 0 16 2 33 1448 14 16 6 2100 14 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None Storage Length 0 - 0 - - - - 150 - - - 220 - - Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 - Grade, % - 0 - - 0 - - - 0 - - - 0 - Peak Hour Factor 97 97 97 97 97 97 92 97 97 97 92 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 4 0 15 7 0 16 2 34 1493 14 17 6 2165 14 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2889 3799 1090 2485 3799 754 1606 2179 0 0 1117 1507 0 0 Stage 1 2219 2219 - 1572 1572 - - - - - - - - - Stage 2 670 1580 - 913 2227 - - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 17 4 181 31 4 302 201 101 - - 378 221 - - Stage 1 27 80 - 79 169 - - - - - - - - - Stage 2 376 168 - 266 79 - - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 16 4 181 28 4 302 104 104 - - 308 308 - - Mov Cap-2 Maneuver 16 4 - 28 4 - - - - - - - - - Stage 1 27 80 - 79 169 - - - - - - - - - Stage 2 355 168 - 243 79 - - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 83.2 72.5 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 104 - - 16 181 76 308 - - HCM Lane V/C Ratio 0.348 - - 0.258 0.085 0.312 0.077 - - HCM Control Delay (s) 57.2 - - 295.3 26.7 72.5 17.7 - - HCM Lane LOS F - - F D F C - - HCM 95th %tile Q(veh) 1 - - 1 0 1 0 - - HCM 2010 TWSC 15158 Future with Project PM 2: Collins Avenue & 186th Street 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 3.4 Movement EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 5 0 25 4 0 15 7 40 2617 12 31 6 2157 6 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free Free RT Channelized - - None - - None - - - None - - - None Storage Length 0 - 0 - - - - 150 - - - 220 - - Veh in Median Storage, # - 0 - - 0 - - - 0 - - - 0 - Grade, % - 0 - - 0 - - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 98 98 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 5 0 26 4 0 15 7 41 2670 12 32 6 2201 6 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 3444 5059 1104 3728 5055 1341 1637 2207 0 0 1974 2683 0 0 Stage 1 2280 2280 - 2772 2772 - - - - - - - - - Stage 2 1164 2779 - 956 2283 - - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.64 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 2.32 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 7 1 177 5 1 122 193 98 - - 124 56 - - Stage 1 24 74 - 10 41 - - - - - - - - - Stage 2 186 40 - 250 74 - - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 6 1 177 ~ 4 1 122 104 104 - - 94 94 - - Mov Cap-2 Maneuver 6 1 - ~ 4 1 - - - - - - - - - Stage 1 24 74 - 10 41 - - - - - - - - - Stage 2 163 40 - 214 74 - - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 199.2 $ 579.5 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1 EBLn2WBLn1 SBL SBT SBR Capacity (veh/h) 104 - - 6 177 17 94 - - HCM Lane V/C Ratio 0.461 - - 0.85 0.144 1.14 0.402 - - HCM Control Delay (s) 65.9 - -$ 1051.7 28.7$ 579.5 66.4 -- HCM Lane LOS F - - F D F F - - HCM 95th %tile Q(veh) 2 - - 1 0 3 2 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 2010 TWSC 15158 Future with Project AM 3: Collins Avenue & 188th Block/S Project Driveway 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 10.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 0 0 2 39 0 75 0 1405 22 42 31 2016 17 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized - - None - - None - - None - - - None Storage Length - - - - - - - - - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 - Grade, % - 0 - - 0 - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 92 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 0 0 2 40 0 77 0 1434 22 46 32 2057 17 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 2793 3676 1037 2422 3674 728 2074 0 0 1140 1456 0 0 Stage 1 2220 2220 - 1445 1445 - - - - - - - - Stage 2 573 1456 - 977 2229 - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 20 5 196 ~ 34 5 314 115 - - 367 234 - - Stage 1 27 80 - 97 195 - - - - - - - - Stage 2 430 193 - 243 79 - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 15 5 196 ~ 34 5 314 115 - - 259 259 - - Mov Cap-2 Maneuver 15 5 - ~ 34 5 - - - - - - - - Stage 1 27 80 - 97 195 - - - - - - - - Stage 2 325 193 - 240 79 - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 23.6 $ 335.2 HCM LOS C F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 115 - - 196 82 259 - - HCM Lane V/C Ratio - - - 0.01 1.419 0.298 - - HCM Control Delay (s) 0 - - 23.6$ 335.2 24.7 - - HCM Lane LOS A - - C F C - - HCM 95th %tile Q(veh) 0 - - 0 9 1 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon HCM 2010 TWSC 15158 Future with Project PM 3: Collins Avenue & 188th Block 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBU SBL SBT SBR Vol, veh/h 1 0 10 7 0 36 0 2596 60 51 62 2120 33 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free Free RT Channelized - - None - - None - - None - - - None Storage Length - - - - - - - - - - 150 - - Veh in Median Storage, # - 0 - - 0 - - 0 - - - 0 - Grade, % - 0 - - 0 - - 0 - - - 0 - Peak Hour Factor 98 98 98 98 98 98 98 98 98 92 98 98 98 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 1 0 10 7 0 37 0 2649 61 55 63 2163 34 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 3478 5128 1098 3783 5114 1355 2197 0 0 2015 2710 0 0 Stage 1 2418 2418 - 2680 2680 - - - - - - - - Stage 2 1060 2710 - 1103 2434 - - - - - - - - Critical Hdwy 6.44 6.54 7.14 6.44 6.54 7.14 5.34 - - 5.64 5.34 - - Critical Hdwy Stg 1 7.34 5.54 - 7.34 5.54 - - - - - - - - Critical Hdwy Stg 2 6.74 5.54 - 6.74 5.54 - - - - - - - - Follow-up Hdwy 3.82 4.02 3.92 3.82 4.02 3.92 3.12 - - 2.32 3.12 - - Pot Cap-1 Maneuver 7 0 178 ~ 4 0 120 99 - - 118 ~ 54 - - Stage 1 19 63 - 12 46 - - - - - - - - Stage 2 216 44 - 203 62 - - - - - - - - Platoon blocked, %- - - - Mov Cap-1 Maneuver 5 0 178 ~ 4 0 120 99 - - 65 65 - - Mov Cap-2 Maneuver 5 0 - ~ 4 0 - - - - - - - - Stage 1 19 63 - 12 46 - - - - - - - - Stage 2 150 44 - 191 62 - - - - - - - - Approach EB WB NB SB HCM Control Delay, s 116 $ 891.9 HCM LOS F F Minor Lane/Major Mvmt NBL NBT NBR EBLn1WBLn1 SBL SBT SBR Capacity (veh/h) 99 - - 43 21 65 - - HCM Lane V/C Ratio - - - 0.261 2.089 1.826 - - HCM Control Delay (s) 0 - - 116$ 891.9$ 535.8 - - HCM Lane LOS A - - F F F - - HCM 95th %tile Q(veh) 0 - - 1 6 11 - - Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon Timings 15158 Future with Project AM 4: 189th Street & Collins Avenue 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 0 0 43 5 11 0 0 0 0 0 2081 35 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm Prot NA NA Protected Phases 3 8 6 Permitted Phases 8 Detector Phase 8 3 8 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 25.0 95.0 Total Split (%) 20.8% 20.8% 20.8%79.2% Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min Max Act Effct Green (s) 11.3 11.3 90.3 Actuated g/C Ratio 0.10 0.10 0.81 v/c Ratio 0.25 0.08 0.44 Control Delay 32.2 17.9 4.0 Queue Delay 0.0 0.0 0.0 Total Delay 32.2 17.9 4.0 LOS C B A Approach Delay 17.9 4.0 Approach LOS B A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 111.7 Natural Cycle: 50 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.44 Intersection Signal Delay: 4.7 Intersection LOS: A Intersection Capacity Utilization 51.6% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: 189th Street & Collins Avenue Timings 15158 Future with Project PM 4: 189th Street & Collins Avenue 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 0 0 42 28 12 0 0 0 0 0 2211 49 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Perm Prot NA NA Protected Phases 3 8 6 Permitted Phases 8 Detector Phase 8 3 8 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 Minimum Split (s) 23.0 23.0 23.0 23.0 Total Split (s) 25.0 25.0 25.0 140.0 Total Split (%) 15.2% 15.2% 15.2%84.8% Yellow Time (s) 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 Lead/Lag Lead-Lag Optimize? Recall Mode Min Min Min C-Max Act Effct Green (s) 14.2 14.2 140.8 Actuated g/C Ratio 0.09 0.09 0.85 v/c Ratio 0.27 0.23 0.42 Control Delay 36.6 34.5 3.4 Queue Delay 0.0 0.0 0.0 Total Delay 36.6 34.5 3.4 LOS D C A Approach Delay 34.5 3.4 Approach LOS C A Intersection Summary Cycle Length: 165 Actuated Cycle Length: 165 Offset: 137 (83%), Referenced to phase 2: and 6:SBT, Start of Green Natural Cycle: 50 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.42 Intersection Signal Delay: 4.6 Intersection LOS: A Intersection Capacity Utilization 53.7% ICU Level of Service A Analysis Period (min) 15 Timings 15158 Future with Project PM 4: 189th Street & Collins Avenue 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 2 Splits and Phases: 4: 189th Street & Collins Avenue Timings 15158 Future with Project AM 5: Collins Avenue & William Lehman Cswy SR856 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 294 0 0 18 0 5 43 0 541 14 13 963 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Prot Free Prot Prot Perm NA Prot NA Protected Phases 3 3 4 2 1 6 Permitted Phases Free 2 Detector Phase 3 3 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 11.0 11.0 10.0 25.0 25.0 9.5 25.0 Total Split (s) 37.0 37.0 14.0 57.0 57.0 12.0 69.0 Total Split (%) 30.8% 30.8% 11.7% 47.5% 47.5% 10.0% 57.5% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 3.0 4.0 All-Red Time (s) 2.0 2.0 1.0 3.0 3.0 0.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 5.0 7.0 7.0 3.0 7.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None Max Max None Max Act Effct Green (s) 13.3 13.3 5.5 60.5 60.5 6.3 62.3 Actuated g/C Ratio 0.15 0.15 0.06 0.67 0.67 0.07 0.69 v/c Ratio 0.61 0.07 0.02 0.13 0.25 0.11 0.41 Control Delay 42.0 34.7 0.2 10.1 7.9 43.9 7.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 42.0 34.7 0.2 10.1 7.9 43.9 7.6 LOS D C A B A D A Approach Delay 8.1 8.1 Approach LOS A A Intersection Summary Cycle Length: 120 Actuated Cycle Length: 90.5 Natural Cycle: 60 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.61 Intersection Signal Delay: 13.6 Intersection LOS: B Intersection Capacity Utilization 55.0% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 5: Collins Avenue & William Lehman Cswy SR856 Timings 15158 Future with Project AM 5: Collins Avenue & William Lehman Cswy SR856 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 0 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.96 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary Timings 15158 Future with Project PM 5: Collins Avenue & William Lehman Cswy SR856 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBU NBL NBT NBR SBL SBT Lane Configurations Volume (vph) 497 0 0 15 0 8 49 0 1149 17 22 987 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Growth Factor 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Heavy Vehicles (%) 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% Bus Blockages (#/hr) 0 0 0 0 0 0 0 0 0 0 0 0 Parking (#/hr) Mid-Block Traffic (%) 0% 0% 0% 0% Shared Lane Traffic (%) Turn Type Prot Free Prot Prot Perm NA Prot NA Protected Phases 3 3 4 2 1 6 Permitted Phases Free 2 Detector Phase 3 3 4 2 2 1 6 Switch Phase Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Minimum Split (s) 11.0 11.0 10.0 25.0 25.0 9.5 25.0 Total Split (s) 45.0 45.0 14.0 92.0 92.0 14.0 106.0 Total Split (%) 27.3% 27.3% 8.5% 55.8% 55.8% 8.5% 64.2% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 3.0 4.0 All-Red Time (s) 2.0 2.0 0.0 3.0 3.0 0.0 3.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 6.0 6.0 4.0 7.0 7.0 3.0 7.0 Lead/Lag Lead Lead Lag Lag Lag Lead Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Recall Mode None None None Max Max None Max Act Effct Green (s) 27.8 27.8 5.5 92.6 92.6 7.5 99.4 Actuated g/C Ratio 0.20 0.20 0.04 0.65 0.65 0.05 0.70 v/c Ratio 0.80 0.05 0.06 0.18 0.55 0.26 0.43 Control Delay 64.4 46.4 0.9 15.6 16.7 73.8 10.8 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 64.4 46.4 0.9 15.6 16.7 73.8 10.8 LOS E D A B B E B Approach Delay 16.7 12.2 Approach LOS B B Intersection Summary Cycle Length: 165 Actuated Cycle Length: 141.9 Natural Cycle: 75 Control Type: Actuated-Uncoordinated Maximum v/c Ratio: 0.80 Intersection Signal Delay: 23.8 Intersection LOS: C Intersection Capacity Utilization 64.8% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 5: Collins Avenue & William Lehman Cswy SR856 Timings 15158 Future with Project PM 5: Collins Avenue & William Lehman Cswy SR856 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 2 Lane Group SBR Lane Configurations Volume (vph) 0 Confl. Peds. (#/hr) Confl. Bikes (#/hr) Peak Hour Factor 0.92 Growth Factor 100% Heavy Vehicles (%) 2% Bus Blockages (#/hr) 0 Parking (#/hr) Mid-Block Traffic (%) Shared Lane Traffic (%) Turn Type Protected Phases Permitted Phases Detector Phase Switch Phase Minimum Initial (s) Minimum Split (s) Total Split (s) Total Split (%) Yellow Time (s) All-Red Time (s) Lost Time Adjust (s) Total Lost Time (s) Lead/Lag Lead-Lag Optimize? Recall Mode Act Effct Green (s) Actuated g/C Ratio v/c Ratio Control Delay Queue Delay Total Delay LOS Approach Delay Approach LOS Intersection Summary HCM 2010 TWSC 15158 Future with Project AM 6: Collins Avenue & N Project Driveway 10/30/2015 Varadero 10/30/2015 15158 Future with Project AM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0.1 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 0 16 505 11 0 1422 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 17 549 12 0 1546 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1173 280 0 0 561 0 Stage 1 555 - - - - - Stage 2 618 - - - - - Critical Hdwy 6.29 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 6.04 - - - - - Follow-up Hdwy 3.67 3.32 - - 2.22 - Pot Cap-1 Maneuver 217 717 - - 1006 - Stage 1 522 - - - - - Stage 2 469 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 217 717 - - 1006 - Mov Cap-2 Maneuver 217 - - - - - Stage 1 522 - - - - - Stage 2 469 - - - - - Approach WB NB SB HCM Control Delay, s 10.1 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 717 1006 - HCM Lane V/C Ratio - - 0.024 - - HCM Control Delay (s) - - 10.1 0 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - HCM 2010 TWSC 15158 Future with Project PM 6: Collins Avenue & N Project Driveway 10/30/2015 Varadero 10/30/2015 15158 Future with Project PM Synchro 9 Report Page 1 Intersection Int Delay, s/veh 0 Movement WBL WBR NBT NBR SBL SBT Vol, veh/h 0 8 1079 29 0 1490 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length - 0 - - - - Veh in Median Storage, # 0 - 0 - - 0 Grade, % 0 - 0 - - 0 Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 9 1173 32 0 1620 Major/Minor Minor1 Major1 Major2 Conflicting Flow All 1837 602 0 0 1204 0 Stage 1 1189 - - - - - Stage 2 648 - - - - - Critical Hdwy 6.29 6.94 - - 4.14 - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 6.04 - - - - - Follow-up Hdwy 3.67 3.32 - - 2.22 - Pot Cap-1 Maneuver 88 443 - - 575 - Stage 1 246 - - - - - Stage 2 452 - - - - - Platoon blocked, %- - - Mov Cap-1 Maneuver 88 443 - - 575 - Mov Cap-2 Maneuver 88 - - - - - Stage 1 246 - - - - - Stage 2 452 - - - - - Approach WB NB SB HCM Control Delay, s 13.3 HCM LOS B Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT Capacity (veh/h) - - 443 575 - HCM Lane V/C Ratio - - 0.02 - - HCM Control Delay (s) - - 13.3 0 - HCM Lane LOS - - B A - HCM 95th %tile Q(veh) - - 0 0 - Appendix D Background Growth Rate Documentation Va r a d e r o Ba c k g r o u n d G r o w t h R a t e St a t i o n Lo c a t i o n 20 0 8 20 0 9 20 1 0 20 1 1 20 1 2 2013 61 7 9 8 7 2 1 N B C o l l i n s A v e 1 3 , 5 0 0 1 3 , 0 0 0 1 4 , 5 0 0 1 4 , 5 0 0 1 7 , 0 0 0 1 6 , 5 0 0 03 1 4 SR A 1 A C o l l i n s A v e 4 0 0 ' N S R 8 5 6 28 , 5 0 0 27 , 0 0 0 26 , 0 0 0 28 , 0 0 0 30 , 5 0 0 30,000 61 1 0 87 1 7 E B S u n n y I s l e 3, 1 0 0 3, 1 0 0 2, 2 0 0 2, 2 0 0 45 0 450 61 8 0 87 2 1 E B C o l l i n s A v e 16 , 5 0 0 16 , 0 0 0 16 , 0 0 0 16 , 0 0 0 16 , 5 0 0 16,000 61 , 6 0 0 59 , 1 0 0 58 , 7 0 0 60 , 7 0 0 64 , 4 5 0 62,950 -4 . 1 % -0 . 7 % 3. 4 % 6. 2 % -2.3%0.5% To t a l Ye a r l y G r o w t h Gr o w t h T r e n d F L O R I D A D E P A R T M E N T O F T R AN S P O R T A T I O N T R A N S P O R T A T I O N S T A T I S T IC S O F F I C E 2 0 1 4 H I S T O R I C A L A A D T R E P O R T CO U N T Y : 8 7 - M I A M I - D A D E SI T E : 6 1 7 9 - R A M P 8 7 2 1 0 0 0 5 F R O M N B C O L L I N S A V E T O W B S R 8 5 6 , 2 0 0 ' N O F C O L L I N S A V E YE A R A A D T D I R E C T I O N 1 D I R E C T I O N 2 * K F A C T O R D F A C T O R T F A C T O R -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 1 4 1 7 0 0 0 C W 1 7 0 0 0 9 . 0 0 9 9 . 9 0 4 . 4 0 20 1 3 1 6 5 0 0 F 0 0 9 . 0 0 9 9 . 9 0 1 . 9 0 20 1 2 1 7 0 0 0 C W 1 7 0 0 0 0 9 . 0 0 9 9 . 9 0 1 . 9 0 20 1 1 1 4 5 0 0 F 0 0 9 . 0 0 9 9 . 9 0 2 . 0 0 20 1 0 1 4 5 0 0 C W 1 4 5 0 0 0 8 . 9 8 9 9 . 9 9 2 . 0 0 20 0 9 1 3 0 0 0 F 0 0 8 . 9 9 9 9 . 9 9 4 . 3 0 20 0 8 1 3 5 0 0 C W 1 3 5 0 0 0 9 . 0 9 9 9 . 9 9 4 . 3 0 20 0 7 1 4 5 0 0 F 0 0 8 . 0 1 9 9 . 9 9 2 . 9 0 20 0 6 1 4 5 0 0 C W 1 4 5 0 0 B 0 7 . 9 7 9 9 . 9 9 2 . 9 0 20 0 5 1 1 5 0 0 S W B 8 . 8 0 9 9 . 9 0 1 4 . 1 0 20 0 4 1 1 5 0 0 F W B 9 . 0 0 9 9 . 9 0 1 4 . 1 0 20 0 3 1 1 5 0 0 C W 1 1 5 0 0 B 0 8 . 8 0 9 9 . 9 0 1 4 . 1 0 A A D T F L A G S : C = C O M P U T E D ; E = M A N U A L E S T I M A TE ; F = F I R S T Y E A R E S T I M A T E S = S E C O N D Y E A R E S T I M A T E ; T = T HI R D Y E A R E S T I M A T E ; F = F O U R T H Y E A R E S T I M A T E V = F I F T H Y E A R E S T I M A T E ; 6 = S IX T H Y E A R E S T I M A T E ; X = U N K N O W N * K F A C T O R : S T A R T I N G W I T H Y E A R 2 0 1 1 I S S T A N D AR D K , P R I O R Y E A R S A R E K 3 0 V A L U E S F L O R I D A D E P A R T M E N T O F T R AN S P O R T A T I O N T R A N S P O R T A T I O N S T A T I S T IC S O F F I C E 2 0 1 4 H I S T O R I C A L A A D T R E P O R T CO U N T Y : 8 7 - M I A M I - D A D E SI T E : 6 1 8 0 - R A M P 8 7 2 1 0 0 0 6 F R O M E B S R 8 5 6 T O S B C O L L IN S A V E , 1 0 0 ' E O F S R 8 5 6 YE A R A A D T D I R E C T I O N 1 D I R E C T I O N 2 * K F A C T O R D F A C T O R T F A C T O R -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 1 4 1 8 0 0 0 C S 1 8 0 0 0 9 . 0 0 9 9 . 9 0 6 . 1 0 20 1 3 1 6 0 0 0 F 0 0 9 . 0 0 9 9 . 9 0 4 . 5 0 20 1 2 1 6 5 0 0 C S 1 6 5 0 0 0 9 . 0 0 9 9 . 9 0 4 . 5 0 20 1 1 1 6 0 0 0 F 0 0 9 . 0 0 9 9 . 9 0 2 . 3 0 20 1 0 1 6 0 0 0 C S 1 6 0 0 0 0 8 . 9 8 9 9 . 9 9 2 . 3 0 20 0 9 1 6 0 0 0 F 0 0 8 . 9 9 9 9 . 9 9 1 . 9 0 20 0 8 1 6 5 0 0 C S 1 6 5 0 0 0 9 . 0 9 9 9 . 9 9 1 . 9 0 20 0 7 1 5 5 0 0 F 0 0 8 . 0 1 9 9 . 9 9 2 . 0 0 20 0 6 1 5 5 0 0 C S 1 5 5 0 0 B 0 7 . 9 7 9 9 . 9 9 2 . 0 0 20 0 5 6 6 0 0 S S B 8 . 8 0 9 9 . 9 0 5 . 1 0 20 0 4 6 6 0 0 F S B 9 . 0 0 9 9 . 9 0 5 . 1 0 20 0 3 6 6 0 0 C S 6 6 0 0 B 0 8 . 8 0 9 9 . 9 0 5 . 1 0 A A D T F L A G S : C = C O M P U T E D ; E = M A N U A L E S T I M A TE ; F = F I R S T Y E A R E S T I M A T E S = S E C O N D Y E A R E S T I M A T E ; T = T HI R D Y E A R E S T I M A T E ; F = F O U R T H Y E A R E S T I M A T E V = F I F T H Y E A R E S T I M A T E ; 6 = S IX T H Y E A R E S T I M A T E ; X = U N K N O W N * K F A C T O R : S T A R T I N G W I T H Y E A R 2 0 1 1 I S S T A N D AR D K , P R I O R Y E A R S A R E K 3 0 V A L U E S F L O R I D A D E P A R T M E N T O F T R AN S P O R T A T I O N T R A N S P O R T A T I O N S T A T I S T IC S O F F I C E 2 0 1 4 H I S T O R I C A L A A D T R E P O R T CO U N T Y : 8 7 - M I A M I - D A D E SI T E : 0 3 1 4 - S R A 1 A / C O L L I N S A V , 4 0 0 ' N S R 8 5 6 / N E 1 9 2 S T YE A R A A D T D I R E C T I O N 1 D I R E C T I O N 2 * K F A C T O R D F A C T O R T F A C T O R -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 1 4 2 8 0 0 0 C N 1 4 5 0 0 S 1 3 5 0 0 9 . 0 0 5 4 . 5 0 4 . 8 0 20 1 3 3 0 0 0 0 C N 1 6 0 0 0 S 1 4 0 0 0 9 . 0 0 5 2 . 4 0 4 . 3 0 20 1 2 3 0 5 0 0 C N 1 5 5 0 0 S 1 5 0 0 0 9 . 0 0 5 5 . 7 0 3 . 7 0 20 1 1 2 8 0 0 0 C N 1 4 0 0 0 S 1 4 0 0 0 9 . 0 0 5 5 . 1 0 4 . 5 0 20 1 0 2 6 0 0 0 C N 1 2 5 0 0 S 1 3 5 0 0 8 . 9 8 5 4 . 0 8 4 . 5 0 20 0 9 2 7 0 0 0 C N 1 3 5 0 0 S 1 3 5 0 0 8 . 9 9 5 3 . 2 4 6 . 7 0 20 0 8 2 8 5 0 0 C N 1 4 0 0 0 S 1 4 5 0 0 9 . 0 9 5 5 . 7 5 9 . 2 0 20 0 7 3 0 0 0 0 C N 1 5 0 0 0 S 1 5 0 0 0 8 . 0 1 5 4 . 3 4 7 . 6 0 20 0 6 2 5 5 0 0 C N 1 2 5 0 0 S 1 3 0 0 0 7 . 9 7 5 4 . 2 2 1 . 5 0 20 0 5 2 5 0 0 0 C N 1 3 0 0 0 S 1 2 0 0 0 8 . 8 0 5 3 . 8 0 7 . 8 0 20 0 4 2 5 0 0 0 C N 1 3 0 0 0 S 1 2 0 0 0 9 . 0 0 5 3 . 3 0 7 . 8 0 20 0 3 2 1 0 0 0 C N 1 0 0 0 0 S 1 1 0 0 0 8 . 8 0 5 3 . 4 0 3 . 4 0 20 0 2 2 7 5 0 0 C N 1 3 5 0 0 S 1 4 0 0 0 9 . 8 0 5 2 . 3 0 0 . 6 0 20 0 1 2 2 5 0 0 C N 1 1 0 0 0 S 1 1 5 0 0 8 . 2 0 5 3 . 5 0 1 . 5 0 20 0 0 2 7 0 0 0 C N 1 3 5 0 0 S 1 3 5 0 0 8 . 2 0 5 3 . 1 0 1 . 6 0 19 9 9 2 4 5 0 0 C N 1 2 0 0 0 S 1 2 5 0 0 9 . 1 0 5 2 . 7 0 1 . 3 0 A A D T F L A G S : C = C O M P U T E D ; E = M A N U A L E S T I M A TE ; F = F I R S T Y E A R E S T I M A T E S = S E C O N D Y E A R E S T I M A T E ; T = T HI R D Y E A R E S T I M A T E ; F = F O U R T H Y E A R E S T I M A T E V = F I F T H Y E A R E S T I M A T E ; 6 = S IX T H Y E A R E S T I M A T E ; X = U N K N O W N * K F A C T O R : S T A R T I N G W I T H Y E A R 2 0 1 1 I S S T A N D AR D K , P R I O R Y E A R S A R E K 3 0 V A L U E S F L O R I D A D E P A R T M E N T O F T R AN S P O R T A T I O N T R A N S P O R T A T I O N S T A T I S T IC S O F F I C E 2 0 1 3 H I S T O R I C A L A A D T R E P O R T CO U N T Y : 8 7 - M I A M I - D A D E SI T E : 6 1 1 0 - R A M P 8 7 1 7 0 3 6 4 F R O M E B S U N N Y I S L E C S T O I N T R A C O A S T A L , 2 5 0 ' W O F S U N N Y I S L E C S YE A R A A D T D I R E C T I O N 1 D I R E C T I O N 2 * K F A C T O R D F A C T O R T F A C T O R -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 20 1 3 4 5 0 F 0 0 9 . 0 0 9 9 . 9 0 8 . 4 0 20 1 2 4 5 0 C E 4 5 0 0 9 . 0 0 9 9 . 9 0 8 . 4 0 20 1 1 2 2 0 0 F 0 0 9 . 0 0 9 9 . 9 0 1 2 . 0 0 20 1 0 2 2 0 0 C E 2 2 0 0 0 7 . 5 9 9 9 . 9 9 1 2 . 0 0 20 0 9 3 1 0 0 F 0 0 7 . 4 8 9 9 . 9 9 3 . 0 0 20 0 8 3 1 0 0 C E 3 1 0 0 0 7 . 4 3 9 9 . 9 9 3 . 0 0 20 0 7 4 0 0 F 0 0 7 . 1 9 9 9 . 9 9 6 . 3 0 20 0 6 4 0 0 C E 4 0 0 0 6 . 3 0 20 0 5 3 1 0 0 S E B 7 . 1 0 9 9 . 9 0 1 0 . 5 0 20 0 4 3 1 0 0 F E B 7 . 0 0 9 9 . 9 0 1 0 . 5 0 20 0 3 3 1 0 0 C E 3 1 0 0 B 7 . 1 0 9 9 . 9 0 1 0 . 5 0 A A D T F L A G S : C = C O M P U T E D ; E = M A N U A L E S T I M A TE ; F = F I R S T Y E A R E S T I M A T E S = S E C O N D Y E A R E S T I M A T E ; T = T HI R D Y E A R E S T I M A T E ; F = F O U R T H Y E A R E S T I M A T E V = F I F T H Y E A R E S T I M A T E ; 6 = S IX T H Y E A R E S T I M A T E ; X = U N K N O W N * K F A C T O R : S T A R T I N G W I T H Y E A R 2 0 1 1 I S S T A N D AR D K , P R I O R Y E A R S A R E K 3 0 V A L U E S Appendix E Committed Development Information The Mansions at Acqualina Transportation Impact Study Page 13 4.3 Project Trip Generation Trip generation for the proposed project was estimated using the Institute of Transportation Engineers (ITE) Trip Generation manual, 8th Edition. This manual provides gross trip generation rates and/or equations by land use type. These rates and equations estimate vehicle trip ends at a free-standing site’s driveways. The project trip generation summary is provided in Exhibit 8. The ITE trip generation worksheet is provided in Appendix D. Exhibit 8 Project Trip Generation Summary Land Use Intensity AM Peak Hour PM Peak Hour In Out Total In Out Total Condominium 85 DUs 8 38 46 35 17 52 Source: David Plummer & Associates 4.4 Project Trip Assignment Project traffic was distributed and assigned to the study area using the Cardinal Distribution for TAZ 591 shown in Exhibit 9. The Cardinal Distribution gives a generalized distribution of trips from a TAZ to other parts of Miami-Dade County. For estimating trip distribution for the project traffic, consideration was given to conditions such as the roadway network accessed by the project traffic, roadways available to travel in the desired direction, and attractiveness of traveling on a specific roadway. The project trip assignment is graphically portrayed in Exhibit 10. Chateau Beach Resort Traffic Study Page 13 4.3 Project Trip Generation Trip generation for the proposed project was estimated using the Institute of Transportation Engineers (ITE) Trip Generation manual, 8th Edition. This manual provides gross trip generation rates and/or equations by land use type. These rates and equations estimate vehicle trip ends at a free-standing site’s driveways. The project trip generation summary is provided in Exhibit 8. The ITE trip generation worksheet is provided in Appendix D. Exhibit 8 Project Trip Generation Summary Land Use Intensity AM Peak Hour PM Peak Hour In Out Total In Out Total Condominium (ITE Land Use 230) 90 DUs 8 39 47 37 18 55 Source: David Plummer & Associates 4.4 Project Trip Assignment Project traffic was distributed and assigned to the study area using the Cardinal Distribution for TAZ 592 shown in Exhibit 9. The Cardinal Distribution gives a generalized distribution of trips from a TAZ to other parts of Miami-Dade County. For estimating trip distribution for the project traffic, consideration was given to conditions such as the roadway network accessed by the project traffic, roadways available to travel in the desired direction, and attractiveness of traveling on a specific roadway. The project trip assignment is graphically portrayed in Exhibits 10. Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Porsche Design Open Date: Phase: Analysis Date: Description: _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 230: Residential Condominium / Townhouse 819 11 53 51 24 132 Dwelling Units [E] _______________________________________________________________________________ Total Driveway Volume 819 11 53 51 24 Total Peak Hour Pass-By Trips 0 0 0 0 Total Peak Hour Vol. Added to Adjacent Streets 11 53 51 24 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Regalia Open Date: Phase: Analysis Date: Description: _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 230: Residential Condominium / Townhouse 290 4 21 19 9 40 Dwelling Units [E] _______________________________________________________________________________ Total Driveway Volume 290 4 21 19 9 Total Peak Hour Pass-By Trips 0 0 0 0 Total Peak Hour Vol. Added to Adjacent Streets 4 21 19 9 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: 17700 Collins Avenue Open Date: Phase: Analysis Date: Description: 14214 Proposed _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 310: Hotel 1585 60 43 60 56 194 Rooms [R] 931: Quality Restaurant 261 0 0 15 7 2.9 Th.Sq.Ft. GFA [R] _______________________________________________________________________________ Total Driveway Volume 1846 60 43 75 63 Total Peak Hour Pass-By Trips 0 0 7 3 Total Peak Hour Vol. Added to Adjacent Streets 60 43 68 60 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Turnberry Ocean Club Open Date: Phase: Analysis Date: Description: 14103 _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 232: High-Rise Residential Condo / Townhouse 644 9 43 37 22 154 Dwelling Units [R] _______________________________________________________________________________ Total Driveway Volume 644 9 43 37 22 Total Peak Hour Pass-By Trips 0 0 0 0 Total Peak Hour Vol. Added to Adjacent Streets 9 43 37 22 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Sunny Isles Publix Open Date: Phase: Analysis Date: 5/11/2015 Description: Proposed #14108 _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 850: Supermarket 5476 113 69 259 249 53.558 Th.Sq.Ft. GFA [R] _______________________________________________________________________________ Total Driveway Volume 5476 113 69 259 249 Total Peak Hour Pass-By Trips 0 0 93 90 Total Peak Hour Vol. Added to Adjacent Streets 113 69 166 159 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Estates at Acqualina Open Date: Phase: Analysis Date: 3/11/2015 Description: Proposed #14105 _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 230: Residential Condominium / Townhouse 1502 19 94 90 44 265 Dwelling Units [E] 931: Quality Restaurant 450 0 0 25 12 5.0 Th.Sq.Ft. GFA [R] _______________________________________________________________________________ Total Driveway Volume 1952 19 94 115 56 Total Peak Hour Pass-By Trips 0 0 11 5 Total Peak Hour Vol. Added to Adjacent Streets 19 94 104 51 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Atlantic 15 (Beachwalk) 12191 Open Date: Phase: Analysis Date: Description: Com Dev 15158 _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 210: Single Family Detached Housing 183 5 15 12 7 15 Dwelling Units [E] _______________________________________________________________________________ Total Driveway Volume 183 5 15 12 7 Total Peak Hour Pass-By Trips 0 0 0 0 Total Peak Hour Vol. Added to Adjacent Streets 5 15 12 7 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Appendix F Site Trip Generation Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Varadero Open Date: 10/30/2015 Phase: Analysis Date: Description: Existing #15158 _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 310: Hotel 1993 76 53 76 70 244 Rooms [R] 230: Residential Condominium / Townhouse 671 9 45 42 21 105 Dwelling Units [E] _______________________________________________________________________________ Total Driveway Volume 2664 85 98 118 91 Total Peak Hour Pass-By Trips 0 0 0 0 Total Peak Hour Vol. Added to Adjacent Streets 85 98 118 91 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Summary of Multi-Use Trip Generation Average Weekday Driveway Volumes (Unadjusted for Internal Trips) Project: Varadero Open Date: Phase: Analysis Date: Description: Proposed #15158 _____________________________________________________________________________________ 24 Hour AM Pk Hour PM Pk Hour Two-Way ITE:Land Use Volume Enter Exit Enter Exit ___________________________________________________________________________________ 232: High-Rise Residential Condo / Townhouse 1849 29 125 100 62 431 Dwelling Units [E] 230: Residential Condominium / Townhouse 587 8 39 37 18 90 Dwelling Units [E] 310: Hotel 490 19 13 19 17 60 Rooms [R] 925: Drinking Place 0 0 0 9 4 1.177 Th.Sq.Ft. GFA [R] 931: Quality Restaurant 430 0 0 24 12 4.776 Th.Sq.Ft. GFA [R] 492: Health/Fitness Club 160 3 4 10 7 4.847 Th.Sq.Ft. GFA [R] 710: General Office Building 24 3 0 1 2 2.161 Th.Sq.Ft. GFA [R] _______________________________________________________________________________ Total Driveway Volume 3540 62 181 200 122 Total Peak Hour Pass-By Trips 0 0 11 5 Total Peak Hour Vol. Added to Adjacent Streets 62 181 189 117 _____________________________________________________________________________________ Note: A zero indicates no data available. Source: Institute of Transportation Engineers Trip Generation Manual, 9th Edition, 2012 TRIP GENERATION 2013, TRAFFICWARE, LLC Out Out In Out In Out In Out In Out In Out 125 39 19 13 0 0 0 0 3 4 3 0 243 -13 -4 -2 -1 0 0 0 0 0 0 0 0 -23 10.0% Transit & Ped 112 35 17 12 0 0 0 0 3 4 3 0 220 0% 0% 0 0 0 0% 0% 0 0 0 0% 0% 0 0 0 0%0% 0 0 0 20%20% 22 0 0 5%4% 1 0 0 20%20% 22 0 0 5%4% 1 0 0 1%17% 1 1 1 2%14% 1 1 1 2%3% 2 0 0 0%1% 0 0 0 0% 0% 0 0 0 0%0% 0 0 0 20% 20% 7 0 0 5%4% 0 0 0 20%20% 7 0 0 5%4% 0 0 0 1%17% 0 0 1 2%14% 0 0 1 2%3% 0 0 0 0%1% 0 0 0 9% 6% 1 0 0 4%3% 1 0 0 9% 6% 1 0 0 4%3% 1 0 0 14%4% 2 0 0 0%0% 0 0 0 75%3% 9 0 0 0%0% 0 0 0 0% 0% 0 0 0 0%0% 0 0 0 14% 8% 0 0 0 50%13% 0 0 1 31%14% 0 0 0 23%63% 0 0 0 14% 8% 0 0 0 50%13% 0 0 1 31% 14% 0 0 0 23%63% 0 0 0 29% 4% 1 0 0 32%28% 1 0 0 Health / Fitness Club Land Use 492 4,847 Sq Ft General Office Land Use 710 2,161 Sq Ft Drinking Place Land Use 925 1,177 Sq Ft Quality Restaurant Land Use 931 4,776 Sq Ft AM Peak Hour Trip Generation and Internalization Varadero Vehicle Trips -2 In High Rise Condo 27 Hotel ITE Trips Land Use 232 431 Dwelling Units In Land Use 310 60 Rooms Resdential Condo Land Use 230 90 Dwelling Units UNBALANCED INTERNALIZATION 29 8 -1 7 AM Peak Hour Trip Generation and Internalization Varadero Out Out In Out In Out In Out In Out In Out 112 35 17 12 0 0 0 0 3 4 3 0 220 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 -1 -1 -1 -1 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 00 -1 0 0 0 0 0 0 0 -1 -1 0 0 -4 Internal 111 35 17 12 0 0 0 0 2 3 3 0 216 External Trips 1.4% 0.0% 0.0% #DIV/0! #DIV/0! 28.6% 0.0% 1.8%% Internal 0 0 44% Pass by Restaurant 111 35 17 12 0 0 0 0 2 3 3 0 216 Net New External Trips26 -1 Vehicle Trips High Rise Condo 7 0 7 Drinking Place Quality Restaurant Health / Fitness Club General Office 7 Hotel 26 In BALANCED INTERNALIZATION 27 Resdential Condo In Out Out In Out In Out In Out In Out In Out 62 18 19 17 9 4 24 12 10 7 12 322 -6 -2 -2 -2 -1 0 -2 -1 -1 -1 0 0 -32 10.0% Transit & Ped 56 16 17 15 8 4 22 11 9 6 12 290 0% 0% 0 0 0 0% 0% 0 0 0 3% 12% 2 2 2 0%2% 0 0 0 21%14% 12 1 1 16%18% 14 1 1 21%14% 12 3 3 16%10% 14 1 1 42%10% 24 1 1 46%20% 41 1 1 4%0% 2 0 0 4%2% 4 0 0 3% 12% 0 0 2 0%2% 0 0 0 21% 14% 3 1 1 16%18% 5 1 1 21%14% 3 3 3 16%10% 5 1 1 42%10% 7 1 1 46%20% 15 1 1 4%0% 0 0 0 4%2% 1 0 0 68% 5% 10 0 0 71%7% 12 0 0 68% 5% 10 1 1 71%7% 12 1 1 16%2% 2 0 0 17%5% 3 0 0 0%0% 0 0 0 0%0% 0 0 0 0% 0% 0 0 0 0%0% 0 0 0 41% 50% 2 2 5 29%20% 2 1 1 3%30% 0 0 0 2%4% 0 0 0 20%50% 2 2 5 29%20% 6 1 1 3% 30% 0 0 0 2%4% 0 0 0 2% 31% 0 0 0 8%20% 1 0 0 Health / Fitness Club Land Use 492 4,847 Sq Ft General Office Land Use 710 2,161 Sq Ft Drinking Place Land Use 925 1,177 Sq Ft Quality Restaurant Land Use 931 4,776 Sq Ft UNBALANCED INTERNALIZATION 90 Vehicle Trips33 -10 431 Dwelling Units 60 Rooms -4 In 100 ITE Trips PM Peak Hour Trip Generation and Internalization Varadero High Rise Condo Hotel Land Use 232 Land Use 310 Resdential Condo Land Use 230 90 Dwelling Units In 37 PM Peak Hour Trip Generation and Internalization Varadero Out Out In Out In Out In Out In Out In Out 56 16 17 15 8 4 22 11 9 6 1 2 290 0 0 00 -2 -2 0 0 -1 -1 -1 -1 -3 -3 -1 -1 -1 -1 -1 -1 0 0 0 0 0 0 00 -1 -1 -1 -1 -3 -3 -1 -1 -1 -1 -1 -1 0 0 0 0 0 0 00 -1 -1 -1 -1 0 0 0 0 0 0 0 0 0 0 00 -2 -2 -1 -1 0 0 0 0 -2 -2 -1 -1 0 0 0 0 0 0 00 -7 -5 -3 -1 -3 -4 -8 -5 -6 -4 0 0 -52 Internal 49 11 14 14 5 0 14 6 3 2 1 2 238 External Trips 6.8% 16.3% 12.5% 58.3% 39.4% 66.7% 0.0% 17.9%% Internal -11 -5 44% Pass by Restaurant 49 11 14 14 5 0 3 1 3 2 1 2 222 87 87 Net New External Trips 30 30 BALANCED INTERNALIZATION -3 -3 In 90 Vehicle Trips In 33 High Rise Condo HotelResdential Condo Drinking Place Quality Restaurant Health / Fitness Club General Office Appendix G Queuing Documentation 5'-0"Collins Ave+6' 0" NGVD + 8 ' 9 " N G V D s f M E P 6 6 5 n o n - G F A s f T o i l e t 5 3 8 G F A s f M E P 1 3 2 6 n o n - G F A s f L o b b y - C o n c i e r g e 2 7 4 1 G F A s f L o u n g e - B r e a k f a s t - L i b r a r y 2 4 3 1 G F A s f L i f t L o b b y 6 4 2 G F A s f F i r e L . 1 5 2 n o n - G F A s f S t a i r s 1 2 7 G F A s f S t a i r s 3 7 7 G F A s f L o u n g e C a f e 5 4 2 G F A s f L o u n g e C a f e 9 2 0 G F A s f F C C 2 4 4 n o n - G F A s f V a l e t 3 1 5 G F A s f T o i l e t 4 5 5 G F A s f S p e c i a l t y R e s t a u r a n t 3 5 3 2 G F A s f C o r r i d o r 8 8 8 G F A s f T o i l e t 4 3 9 G F A s f L i f t L o b b y 5 8 7 G F A s f L i f t L o b b y 6 3 7 G F A s f C l u b R o o m 5 0 5 9 G F A s f M E P 1 1 5 7 n o n - G F A s f H O A 1 5 7 1 G F A s f L o b b y - C o n c i e r g e 3 4 3 2 G F A s f F i r e L . 1 6 0 n o n - G F A s f F i r e L . 1 6 0 n o n - G F A s f L o b b y 2 2 5 6 G F A 1 1 1 11 1 1 1 1 1 E L . S . E L . E L . S . E L . E L . H . E L . H . E L . H . E L . E L . E L . E L . S . E L . E L . E L . D N D N U P U P U P U P S T R . S T R . S T R . S T R . E L . E L . S . E L . S T R . U P D N S T R . U P E L . Ramp 14%Ramp 14%7% blend7% blend 7% blendLevel 1ELEV. +15'-8"Level 1ELEV. +15'-8" L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 1 E L E V . + 1 5 ' - 8 " L e v e l 2 E L E V . + 2 6 ' - 0 " Level 2ELEV. +26'-0" L e v e l 2 E L E V . + 2 6 ' - 0 " Level 2ELEV. +26'-0"Level 2ELEV. +26'-0" L e v e l 2 E L E V . + 2 6 ' - 0 " L e v e l 2 E L E V . + 2 6 ' - 0 " L e v e l 2 E L E V . + 2 6 ' - 0 " 12'-0"15'-0"12'-0"12'-0"8'-0"12'-0"12'-0"12'-0"30'-0"12'-0"12'-0"8'-0" 1 2 ' - 0 " 1 2 ' - 0 " 8 ' - 7 " F I R E E N G I N E S E T - U P S I T E 4 7 ' - 0 " 21'-0" B 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " F I R E E N G I N E S E T - U P S I T E 4 7 ' - 0 " 21'-0" A 1 0 ' - 0 " 1 0 ' - 0 " 1 0 ' - 0 " R15'-0" R 1 5 ' - 0 " R15'-0" L 2 L 3 L 2 L 3 L e v e l 2 E L E V . + 2 6 ' - 0 " L e v e l 2 E L E V . + 2 7 ' - 0 " R50'-0"R50'-0" R 5 0 ' - 0 " R 5 0 ' - 0 " 15'-0" D A D E C O U N T Y B U L K H E A D L I N E P L A T B O O K 7 4 P A G E 1 Tower Setback50' Porte Cochere 4 7 ' - 0 " O F F S E T F R O M E C L L I N E B U L K H E A D L I N E 4 7 ' - 0 " O F F S E T F R O M E C L L I N E FOUND NAIL & DISKLB3653 (3/24/15) P h a s e 1 l i n e a l l o w i n g 3 0 0 ' w i d t h f o r p h a s e 1 2 5 ' - 0 " 2 1 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 2 ' - 3 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 2 5 ' - 0 " 31'-4"31'-4"31'-4"31'-4" 3 1 ' - 4 " 1 3 ' - 8 " 3 1 ' - 4 " 3 1 ' - 4 " 3 1 ' - 4 " 3 1 ' - 4 " 75'-0" 1 3 - 0 0 2 1 4 P O N M L K J I H G F E D C B A 1 3 1 2 1 1 9 7 6 54323.11.1 1 3 . 1 1 4 . 1 1 5 . 1 13-002 1 3-001 1 3-001 1 0 1 1 3 ' - 8 " 31'-4" 8 1 6 ' - 8 " 3 2 ' - 1 " 3 1 ' - 4 " 1.2 10'-0"2.1 32'-1" d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 K u r t D a n n w o l f F L . A r c h i t e c t R e g . N o : A R 9 2 0 4 2 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t S c h i e h a v e n 1 3 m 3 0 2 4 E C R o t t e r d a m T h e N e t h e r l a n d s c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J P G E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 3 1 ( 0 ) 1 0 4 8 5 5 8 0 1 c l i e n t 1 - 0 0 2 B A C K G R O U N D 0 9 / 1 4 / 2 0 1 5 s f T r a s h R o o m 3 3 5 . 2 n o n - G F A s f T r a s h R o o m 3 3 5 . 2 n o n - G F A s f T r a s h R o o m 3 1 5 . 6 n o n - G F A s f F i r e L . 1 5 1 . 9 n o n - G F A s f F i r e L . 1 6 0 . 2 n o n - G F A s f F i r e L . 1 6 0 . 2 n o n - G F A s f C i r c u l a t i o n 5 6 2 . 2 G F A s f C i r c 9 1 6 . 0 G F A s f B O H 4 0 4 8 . 7 G F A s f P a r k i n g 1 6 2 5 1 1 . 2 n o n - G F A s f S t o r a g e 4 8 2 . 4 n o n - G F A T2 T2 T2 T2 T2 T2T2 T2 T2 T2 T2 T3T3T3T3T3T3T3T3T3T3T3T3 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T3T3 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2T2 T3T3T3T3T3T3T3T3T3T3T3T3 T3T3T3T3T1T1T1T1T1T1T1T1T1T1 T2 2 2 2 2 T3T3T3T3T3T3T3T3T3T3T3T3 T3 T3 T3 T3 T1T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3 T3T3 T3 T3 T1 1 1 1 1 13 C O M P A C T O R 0 2 T2 T2T3 T3T3T3T3T3T3 T3T3T3T3T3T3 T3T3T3T3T3 T2T2T2T2 T2 T2 T2 T2 T2 T2T2T2 T2 T2 T2 T2T2T2 T2 T2 T2 T2T2T2 T2 T2 T2 T2T2T2 22 2 T1 T1 T1T1T1T1 T3T3T3 T3T3T3 T3T3T3 L O A D I N G T O W E R 2 C O M P A C T O R 0 1 L O A D I N G T O W E R 1 2 2 2 2 2 2 2 2 2 2 2 T2 T22 T2 T2 2 22222 2 2 2 T2 T2 2 2 2 2 222222222T1T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3T3 T3T3T3T3T3 2 2 2 2 222 T3T3 2 2 T2 T2 T2 T2 T2 T2T2T2 T2 T2 T2T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T2 T2 T2 T2 1T2T3 T1T1T1T1T1T1 2 2 T2 T2 2 T2 222 T2 T2 2 2 2 2 T1T2T2T2T2T2 2T2T2 T1T1 T1T1 7'-0" line7'-0" line L o a d i n g / S t r g 72'-0" 6 0 ' - 3 " Ramp 8% 2 4 ' - 3 " 3'-0"9'-0"9'-0"9'-0"3'-0"24'-0"Beach AccesaboveFPL Vault ? B a s e m e n t 1 E L E V . - 4 ' - 0 " B a s e m e n t 1 E L E V . - 4 ' - 0 " B a s e m e n t 1 E L E V . - 4 ' - 0 " B a s e m e n t 1 E L E V . - 4 ' - 0 " 2 2 ' - 0 " 3 6 ' - 0 " 22'-0"36'-0" 5 4 ' - 0 " 3 6 ' - 0 " 4 2 ' - 3 " 22'-0"37'-0" 2 2 ' - 0 " 3 4 ' - 4 " 3 6 ' - 0 " 2 2 ' - 0 " 7 2 ' - 0 " 3 6 ' - 0 " 36'-0"double mechanicalparking from 12'-8"line triple mechanicalparking from 18'-8"line double mechanicalparking from 12'-8"line triple mechanicalparking from 18'-8"line36'-0"Blend 1 ' - 6 " 4 7 ' - 0 " 2 2 ' - 0 " 2 2 ' - 0 " Ramp 16% 1 8 ' - 0 " R a m p 1 6 % R a m p 1 6 % R a m p 1 6 % 1 8 ' - 0 " 2 2 ' - 2 " 1 8 ' - 0 " B a s e m e n t 1 E L E V . + 2 ' 4 " B a s e m e n t 1 E L E V . + 2 ' 4 " B a s e m e n t 1 E L E V . + 2 ' 4 " B a s e m e n t 1 E L E V . + 2 ' 4 " Basement 1ELEV. -4'-0" B a s e m e n t 1 E L E V . + 2 ' 4 " B a s e m e n t 1 E L E V . + 2 ' 4 " 18'-0"4'-0" 1'-6" 18'-0"4'-0"1'-6"22'-0" 3 0 ' - 0 " 2 8 ' - 5 " 8 ' - 0 " D A D E C O U N T Y B U L K H E A D L I N E P L A T B O O K 7 4 P A G E 1 Tower Setback50' Porte Cochere 4 7 ' - 0 " O F F S E T F R O M E C L L I N E B U L K H E A D L I N E 4 7 ' - 0 " O F F S E T F R O M E C L L I N E FOUND NAIL & DISKLB3653 (3/24/15) P h a s e 1 l i n e a l l o w i n g 3 0 0 ' w i d t h f o r p h a s e 1 2 5 ' - 0 " 2 1 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 2 ' - 3 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 3 0 ' - 0 " 2 5 ' - 0 " 31'-4"31'-4"31'-4"31'-4" 3 1 ' - 4 " 1 3 ' - 8 " 3 1 ' - 4 " 3 1 ' - 4 " 3 1 ' - 4 " 3 1 ' - 4 " 75'-0" 1 3 - 0 0 2 1 4 P O N M L K J I H G F E D C B A 1 3 1 2 1 1 9 7 6 54323.11.1 1 3 . 1 1 4 . 1 1 5 . 1 13-002 1 3-001 1 3-001 1 0 1 1 3 ' - 8 " 31'-4" 8 1 6 ' - 8 " 3 2 ' - 1 " 3 1 ' - 4 " 1.2 10'-0"2.1 32'-1" d a t e r e v . i s s u a n c e i d . & d e s c r i p t i o n k e y p l a n 1 0 0 0 E H a l l a n d a l e B e a c h B l v d . H a l l a n d a l e B e a c h , F L 3 3 0 0 9 T + 1 ( 9 5 4 ) 4 5 5 8 7 8 8 1 3 0 0 B r i c k e l l A v e n u e M i a m i , F L 3 3 1 3 1 T + 1 ( 3 0 5 ) 3 5 1 1 0 0 0 K u r t D a n n w o l f F L . A r c h i t e c t R e g . N o : A R 9 2 0 4 2 C H A T E A U G R O U P D a t e O r i g i n a t o r S c a l e D r a w n b y N u m b e r T i t l e c l i e n t F O R T U N E I N T E R N A T I O N A L G R O U P W E S T 8 / R O S E N B E R G G A R D N E R D E S I G N l a n d s c a p e a r c h i t e c t S c h i e h a v e n 1 3 m 3 0 2 4 E C R o t t e r d a m T h e N e t h e r l a n d s c i v i l e n g i n e e r s t r u c t u r a l e n g i n e e r m e c h a n i c a l & e l e c t r i c a l e n g i n e e r V S N E N G I N E E R I N G D E S I M O N E J P G E N G I N E E R I N G G R O U P 8 5 5 0 W . F l a g l e r S t . # 1 1 3 M i a m i , F L 3 3 1 4 4 8 0 0 B r i c k e l l A v e . # 6 0 0 M i a m i , F L 3 3 1 3 1 3 5 5 3 N W 7 9 t h A v e . M i a m i , F L 3 3 1 2 2 c h e c k V A R A D E R O 1 8 8 0 1 C o l l i n s A v e n u e S u n n y I s l e s B e a c h , F L 3 3 1 6 0 P r o j e c t N a m e S t a d h o u d e r s k a d e 1 1 3 , P O b o x 7 5 3 8 1 , 1 0 7 0 A J A m s t e r d a m T + 3 1 ( 0 ) 2 0 5 7 0 2 0 4 0 T h e N e t h e r l a n d s d e s i g n c o n s u l t a n t 6 3 1 0 N W 2 n d A v e . M i a m i , F L 3 3 1 5 0 T + 1 ( 7 8 6 ) 7 0 8 2 4 7 4 U N S T U D I O / T R A C H T E N B E R G G E N E R A L N O T E S a r c h i t e c t o f r e c o r d O D P A R C H I T E C T S 2 4 3 2 H o l l y w o o d B l v d . H o l l y w o o d , F L 3 3 0 2 0 1 7 6 7 0 N W 7 8 T H A v e . H i a l e a h , F L 3 3 0 1 5 T + 1 ( 3 0 5 ) 3 9 2 - 1 0 1 6 T + 1 ( 9 5 4 ) 5 1 8 0 8 3 3 T + 1 ( 3 0 5 ) 4 4 1 0 7 5 5 T + 1 ( 3 0 5 ) 4 3 6 9 2 9 2 T + 1 ( 3 0 5 ) 5 5 1 6 2 6 7 T + 3 1 ( 0 ) 1 0 4 8 5 5 8 0 1 c l i e n t 1 - 0 B 1 B A C K G R O U N D 0 9 / 1 4 / 2 0 1 5 Date:July 20,2011 Observer:J. Espinosa (DPA) Vehicle In Out Type Arrival Time Processing Time Notes 1 X Car 8:34 AM 0:00:37 Valet Return 2 X Car 8:35 AM 0:01:06 Valet Return 3 X Car 8:36 AM 0:00:25 Valet Return 4 X Car 8:36 AM 0:00:38 Pick Up (Personal) 5 X Car 8:41 AM 0:00:18 Guest In 6 X Car 8:45 AM 0:00:30 Valet Return 7 X Car 8:52 AM 0:01:17 Check In 8 X Car 9:02 AM 0:01:46 Check Out 9 X Car 9:04 AM 0:01:01 Check In 10 X Car 9:05 AM 0:00:51 Check In 11 X Van 9:06 AM 0:00:32 Tour 12 X Taxi 9:09 AM 0:00:26 Guest Out 13 X Car 9:09 AM 0:02:34 Check In 14 X Car 9:10 AM 0:00:26 Valet Return 15 X Car 9:11 AM 0:00:37 Valet Return 16 X Car 9:14 AM 0:00:28 Guest In 17 X Car 9:14 AM 0:00:22 Valet Return 18 X Car 9:18 AM 0:01:02 Check In 19 X Car 9:18 AM 0:00:36 Valet Return 20 X Taxi 9:21 AM 0:00:22 Guest Out 21 X Car 9:21 AM 0:01:26 Check Out 22 X Car 9:22 AM 0:00:44 Valet Return 23 X Car 9:25 AM 0:01:21 Check In 24 X Car 9:25 AM 0:01:06 Valet Return 25 X Car 9:26 AM 0:00:23 Valet Return 26 X Car 9:28 AM 0:00:25 Valet Return 27 X Car 9:29 AM 0:00:22 Valet Return 28 X Car 9:29 AM 0:00:21 Valet Return 29 X Car 9:34 AM 0:00:46 Valet Return 30 X Car 9:38 AM 0:01:04 Check In 31 X Car 9:38 AM 0:00:36 Valet Return 32 X Car 9:39 AM 0:00:21 Valet Return 33 X Car 9:41 AM 0:00:34 Guest Out 34 X Car 9:43 AM 0:00:14 Valet Return 35 X Car 9:45 AM 0:02:04 Check Out 36 X Car 9:45 AM 0:01:20 Check In 37 X Taxi 9:48 AM 0:00:48 Check Out 38 X Car 9:49 AM 0:00:26 Guest Out 39 X Car 9:49 AM 0:00:48 Valet Return 40 X Car 9:51 AM 0:00:37 Check In 41 X Car 9:51 AM 0:00:30 Valet Return 42 X Car 9:57 AM 0:00:28 Valet Return 43 X Car 9:58 AM 0:01:22 Check Out 44 X Car 10:02 AM 0:00:32 Valet Return 45 X Car 10:03 AM 0:00:35 Valet Return 46 X Van 10:04 AM 0:00:46 Valet Return 47 X Car 10:06 AM 0:00:39 Check In 48 X Car 10:08 AM 0:01:58 Check Out 49 X Taxi 10:08 AM 0:01:48 Check Out 50 X Car 10:09 AM 0:00:41 Valet Return 51 X Car 10:10 AM 0:00:44 Valet Return 52 X Car 10:12 AM 0:00:26 Valet Return 53 X Taxi 10:13 AM 0:00:42 Check In 54 X Taxi 10:14 AM 0:02:21 Check Out 55 Taxi 10:16 AM 0:01:48 Check Out 56 X Car 10:18 AM 0:00:37 Valet Return 57 X Car 10:18 AM 0:00:56 Valet Return 58 X Car 10:20 AM 0:00:40 Guest In 59 X Car 10:24 AM 0:00:57 Valet Return 0:50:10 0:00:51 Grand Beach Hotel Total Processing Time: Average Processing Time: 1 | P a g e November 6, 2015 Mr. Ron Choron La Playa Beach Associates, LLC 1300 Brickell Avenue Miami, Florida 33131 Phone: (786) 295-4595 E-mail: rlchoron@fortuneintlgroup.com Re: Varadero Shared Parking Analysis - #15158 Dear Mr. Choron, We have completed a shared parking analysis for the proposed Varadero project. The proposed project is located at 18801 Collins Avenue in Sunny Isles Beach, Florida. The project is proposing to redevelop an existing hotel and residential condominium. The proposed project will have a total of 431 residential units, 60 hotel rooms, 90 condo-hotel rooms, and various amenities such as: Spa and Fitness, Bar/Lounge, Restaurant, Ballroom/Assembly, and Administrative Office space. The analysis was based on the development program shown in Exhibit 1. Parking Generation A parking analysis was conducted for the project to determine if the proposed number of parking spaces is sufficient to satisfy the anticipated peak parking demand for the weekday and weekend conditions. To determine the required number of parking spaces, parking rates provided in the city of Sunny Isles Beach Code of Ordinances were used (see attachment 1). Exhibit 2 shows the results of the parking analysis. 2 | P a g e Exhibit 1 Development Program Land Use Residential- 1 Bedrooms < 1800 SF 97 Units Residential- 2 Bedrooms < 1800 SF 74 Units Residential- 3 Bedrooms > 1800 SF 155 Units Residential- 4 Bedrooms > 1800 SF 95 Units Residential- 5 Bedrooms > 1800 SF 4 Units Residential- Penthouse > 1800 SF 6 Units Hotel - Standard < 750 SF 48 Rooms Hotel - Park Suites 750 < > 1000 SF 6 Rooms Hotel - Junior Suites > 1000 SF 6 Rooms Apartment Hotel- 1 Bed < 800 SF 24 Rooms Apartment Hotel- 2 Bed 800 < > 1000 SF 54 Rooms Apartment Hotel- 3 Bed > 1000 SF 12 Rooms Spa and Fitness 4,847 SF 4,847 SF Bar/Lounge 1,177 SF 1,177 SF Restaurant 4,776 SF 4,776 SF Ballroom/Assembly 9,034 SF 9,034 SF Office (Admin) 2,161 SF 2,161 SF Size Units 3 | P a g e Exhibit 2 Parking Analysis It should be noted that these rates are based on actual parking demand by the individual land uses. However, these parking demands do not occur at the same time of the day. Therefore a shared parking analysis based on the procedures outlined on the ULI Shared Parking, 2nd Edition was conducted for the project. The shared parking analysis was conducted considering only the parking demand for the hotel, condo/hotel and hotel auxiliary uses. The required number of residential parking spaces will be provided as per city code and is not part of the shared parking analysis. Attachment 1 also includes the ULI published tables used in the analysis. Land Use Sunny Isle Parking Requirement Rate Total Parking Residential- 1 Bedrooms 97 Units 1.5 space / room 1.5 146 Residential- 2 Bedrooms 74 Units 1.5 space / room 1.5 111 Residential- 3 Bedrooms 155 Units 2 space / room 2 310 Residential- 4 Bedrooms 95 Units 2 space / room 2 190 Residential- 5 Bedrooms 4 Units 2 space / room 2 8 Residential- Penthouse 6 Units 2 space / room 2 12 Hotel - Standard 48 Rooms 1 space / room 1 48 Hotel - Park Suites 6 Rooms 1 space / room 1 6 Hotel - Junior Suites 6 Rooms 1 space / room 1 6 Apartment Hotel- 1 Bed 24 Rooms 1 space / room 1 24 Apartment Hotel- 2 Bed 54 Rooms 1.75 space / room 1.75 95 Apartment Hotel- 3 Bed 12 Rooms 2 space / room 2 24 Spa and Fitness 4,847 SF 1 space / 250 SF of GFA 250 20 Bar/Lounge 1,177 SF 1 space / 100 SF of GFA 100 12 Restaurant 4,776 SF 1 space / 100 SF of GFA 100 48 Ballroom/Assembly 9,034 SF 1 space / 200 SF of GFA 200 46 Office (Admin) 2,161 SF 1 space / 300 SF of GFA 300 8 1,114Total Parking Spaces Units 4 | P a g e Shared Parking Analysis Shared parking is the use of parking spaces to serve two or more individual land uses without conflict or encroachment. The ability to share parking spaces is the result of variations in the accumulation of vehicles by hour, by day or by season at the individual land uses. The shared parking principle also accounts for the relationships among the land uses that result in visiting multiple uses on the same auto trip and the mode of transportation used to reach the site. The main goal of shared parking is to determine a balance between providing enough parking to support a development and reducing the excessive area dedicated to parking. Shared parking analysis was conducted for the project based on the procedures outlined in the Urban Land Institute (ULI) Shared Parking, 2nd Edition and parking rates provided in the city of Sunny Isles Beach Code of Ordinances (Article VIII). The hourly distribution analysis was conducted for both, a typical weekday and a weekend. The results of the analysis show that the highest accumulation of parking occurs during a typical weekend between 9:00 PM and 10:00 PM. Attachment 2 includes the results of the analysis. Parking requirements based on the individual land uses were adjusted to account for seasonal variations, hourly distribution, non-captive ratios and mode adjustments to estimate the actual number of parking spaces required for the site. The result of the shared parking analysis shows that the proposed project requires 245 parking spaces to satisfy the maximum parking requirement for the Hotel, Condo/Hotel and the hotel auxiliary uses. Exhibit 3 shows the results of the analysis. 5 | P a g e Unadjusted Parking Requirement Month Adjustment Late December Peak Hour Adjustment Weekdend at 9 pm Non-captive Adjustment Mode Adjustment Adjusted Parking Requirement Late December Weekend at 9 pm Hotel - Standard Guest 37 100% 95% 100% 95% 34 Employees 11 100% 55% 100% 90% 5 Hotel - Park Suites Guest 5 100% 95% 100% 95% 4 Employees 1 100% 55% 100% 90% 1 Hotel - Junior Suites Guest 5 100% 95% 100% 95% 4 Employees 1 100% 55% 100% 90% 1 Apartment Hotel- 1 Bed Guest 19 100% 95% 100% 95% 17 Employees 5 100% 55% 100% 90% 3 Apartment Hotel- 2 Bed Guest 74 100% 95% 100% 95% 67 Employees 21 100% 55% 100% 90% 10 Apartment Hotel- 3 Bed Guest 19 100% 95% 100% 95% 17 Employees 5 100% 55% 100% 90% 3 Spa and Fitness Customer 19 95% 10% 95% 100% 2 (Health Club) Employees 1 100% 20% 100% 95% 0 Bar/Lounge Customer 12 95% 67% 95% 95% 7 Restaurant Customer 48 95% 67% 95% 95% 28 Ballroom/Assembly Customer 46 100% 100% 95% 95% 42 Office (Admin) Visitors 1 80% 0% 100% 100% 0 Employees 7 80% 0% 100% 100% 0 TOTAL REQUIRED1 337 TOTAL REQUIRED WITH SHARED PARKING1 245 1 Required parking for Hotel, Condo/Hotel and Hotel uses. Residential parking is not part of the shared parking analysis. Land Use Exhibit 3 Shared Parking Analysis Required Number of Parking Spaces Hotel – Condo/Hotel – Hotel Uses Parking Management Strategies The project has developed a Parking Management Plan to ensure an efficient parking system that is convenient to both commercial uses and residents as well as to protect residential neighborhoods from spillover parking. 6 | P a g e Shared Parking Shared parking is the use of parking spaces to serve two or more individual land uses. The ability to share parking spaces is the result of variations in the accumulation of vehicles by hour and by day at the individual land uses. A shared parking analysis was conducted for this project and the results are presented above. Pedestrian / Bicyclist - The project is located in an area conducive to pedestrian and bicycle activities. The area surrounding the proposed Varadero project has a comprehensive sidewalk network, signalized intersections with clearly marked crosswalks, and pedestrian signals. This environment promotes walking and bicycling as a means of transportation and further reduces the need for off-street parking. Transit - The area surrounding the project is served by mass transit. There are approximately 4 bus routes in the vicinity of the project; in addition to the Sunny Isles Beach Community Shuttle. The use of mass transit is another effective way to reduce the need for off-street parking. In addition, there are other parking management strategies that could have a significant impact on the reduction of off-street parking. The proposed project will consider using the following strategies to improve the efficiency of the parking areas and reduce the parking demand: • Provide tandem parking for valet use. • Encourage businesses to implement commuter trip reduction programs for their employees. • Provide information to residents, employees and visitors about transit, ridesharing and bicycle facilities options. The parking management strategies discussed above could have a significant impact on the reduction of off-street parking. The percent of reduction varies between 5% and 10% depending on the effort that the development puts to promote these strategies. 7 | P a g e Conclusion Based on the parking generation analysis, shared parking principles, transit availability, walking/bicycling opportunities, and the proposed parking management plan opinion that the proposed Varadero spaces to satisfy their parking demand 777 parking spaces for the residential uses proposed project. Should you have any questions or comments, please call me at (305) 447 Sincerely, Juan Espinosa, PE Vice President – Transportation w:\15\15158\shared parking\shared parking october 2015 Based on the parking generation analysis, shared parking principles, transit availability, and the proposed parking management plan it is our professional Varadero project should provide 1,022 parking spaces; to satisfy their parking demand for the Hotel, Condo/Hotel and the hotel auxiliary uses 77 parking spaces for the residential uses. We stand ready to provide any support needed for this Should you have any questions or comments, please call me at (305) 447 shared parking october 2015\resivesd_no residential\parking analysis_letter varadero_revised nov 2015_rev.docx Based on the parking generation analysis, shared parking principles, transit availability, it is our professional 1,022 parking spaces; 245 parking for the Hotel, Condo/Hotel and the hotel auxiliary uses and We stand ready to provide any support needed for this Should you have any questions or comments, please call me at (305) 447-0900. parking analysis_letter varadero_revised nov 2015_rev.docx Attachment 1 8/7/2015 Sunny Isles Beach, FL Code of Ordinances about:blank 8/20 Townhouse 2 parking spaces per unit Multifamily dwelling 1.5 parking spaces per unit except that a unit with the size of 1,800 square feet or greater shall be required to provide 2 parking spaces per unit (Ord. No. 2012-383, § 2, 2-16- 2012) For 20 units or more guest parking must be provided equal to a minimum of 5% of the required spaces for buildings without valet parking Dormitories, sororities, fraternities 1 parking space per bed Apartment-hotels 1 parking space per each efficiency or 1-bedroom unit 1 ¾ parking spaces per each 2-bedroom unit 2 parking spaces per each 3- or more bedroom unit 1 additional space for units with "lockout" bedrooms Hotels 1 parking space per each room or suite Hotels in the MU-R District 1 parking space per each room or suite plus 1 space per every 100 square foot of restaurant, lounge, nightclub, or similar establishment dispensing food and/or beverages Hotels in the B-2 District 1 parking space per each room or suite plus 50% of the requirements of this chapter for ancillary retail and service sues within the hotel without ground level window exposure and/or exterior entrances facing the street 1 parking space per each room or suite plus 35% of the requirements of this chapter for ancillary retail and service sues within the hotel and with ground level window exposure and/or exterior entrances facing the street Adult retirement communities 1 parking space per each dwelling unit plus 1 space for each employee on the day shift Assisted-living facilities, nursing homes 1/2 parking space per bed plus 1 space for each employee on the day shift 8/7/2015 Sunny Isles Beach, FL Code of Ordinances about:blank 9/20 Extended or long-term living facilities, hospices 1/2 parking space per bed plus 1 space for each employee on the day shift   Minimum Parking Spaces Required Nonresidential: Amusement and Recreational Facilities Use Number of Spaces Amusement center, general 1 space per 200 square feet of GFA Arenas and stadiums 1 space per 4 seats or 1 space per 200 square feet of GFA Baseball/softball diamonds 20 spaces per diamond Auditorium 1 space per 4 seats or 1 space per 200 square feet GFA, whichever is greater Batting cages 2 spaces per cage Billboard/pool center 1 space per 150 square feet GFA Bowling center 4 spaces per lane plus additional parking according to this chapter for any restaurant, lounge or retail component Cinema/movie theater 1 space per 4 seats Community centers (nongovernmental) 1 space 250 square feet GFA Outdoor courts (tennis, racquetball, handball, etc.) 3 spaces per court Dance hall 1 space per 4 seats or 1 space per 200 square feet of GFA, whichever is greater Dance school 1 space per 200 square feet of GFA Indoor court facility 4 spaces per court plus additional parking according to this chapter for any spa, restaurant, lounge or retail component Commercial marinas 5 spaces, plus 1 space for every 2 slips, plus 1 space for each 10 dry-storage spaces, plus 1 space for each 350 16 [] 8/7/2015 Sunny Isles Beach, FL Code of Ordinances about:blank 11/20 Post offices 1 space per 100 square feet of area accessible to the public Elementary & middle schools 5 spaces plus 1 space per classroom or 1 space per 10 seats of the largest assembly room, whichever is larger Nursery schools 5 spaces plus one per employee or 1 space per 400 square feet of GFA, whichever is greater Secondary schools 10 spaces plus 1 space per classroom, plus 1 space for each 5 students or 1 space per 10 seats of largest assembly room, whichever is greater   Minimum Parking Spaces Required Nonresidential: Light Manufacturing and Warehousing Use Use Number of Spaces Building supplies 1 space per 400 square feet GFA Contractor shops (general, electrical, plumbing, roofing, a/c) 1 space per 400 square feet GFA Marine supplies 1 space per 500 square feet GFA Medical supplies 1 space per 500 square feet GFA Research and testing labs 1 space per 500 square feet GFA Self-storage warehouses 1 space per 500 square feet GFA plus 1 space per 300 GFA for any office component   Minimum Parking Spaces Required Nonresidential: Offices, Medical and Professional Use Number of Spaces Business and professional offices 1 space per 300 square feet GFA Attachment 2 Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Pa r k i n g Ra t e Parking Rate Parking Rate Parking Rate Parking Rate Parking Rate Parking Rate Parking Rate Parking Ho t e l - S t a n d a r d G u e s t 37 95 % 36 95 % 36 90 % 34 80 % 30 70 % 26 70 % 26 65 % 24 65 % 24 70 % 26 70 % 26 75 % 28 80 % 30 85%32 85%32 90%34 95%36 95%36 100%37 100%37 Em p l o y e e s 11 5% 1 30 % 3 90 % 10 90 % 10 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 90 % 10 70 % 7 40%4 20%2 20%2 20%2 20%2 10%1 5%1 Ho t e l - P a r k S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 70 % 1 40%1 20%0 20%0 20%0 20%0 10%0 5%0 Ho t e l - J u n i o r S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 70 % 1 40%1 20%0 20%0 20%0 20%0 10%0 5%0 Ap a r t m e n t H o t e l - 1 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 70 % 4 40%2 20%1 20%1 20%1 20%1 10%1 5%0 Ap a r t m e n t H o t e l - 2 B e d G u e s t 74 95 % 70 95 % 70 90 % 67 80 % 59 70 % 52 70 % 52 65 % 48 65 % 48 70 % 52 70 % 52 75 % 56 80 % 59 85%63 85%63 90%67 95%70 95%70 100%74 100%74 Em p l o y e e s 21 5% 1 30 % 6 90 % 19 90 % 19 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 90 % 19 70 % 15 40%8 20%4 20%4 20%4 20%4 10%2 5%1 Ap a r t m e n t H o t e l - 3 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 70 % 4 40%2 20%1 20%1 20%1 20%1 10%1 5%0 Sp a a n d F i t n e s s C u s t o m e r 19 70 % 13 40 % 8 40 % 8 70 % 13 70 % 13 80 % 15 60 % 11 70 % 13 70 % 13 70 % 13 80 % 15 90 % 17 100%19 90%17 80%15 70%13 35%7 10%2 0%0 (H e a l t h C l u b ) E m p l o y e e s 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 75 % 1 10 0 % 1 100%1 75%1 50%1 20%0 20%0 20%0 0%0 Ba r / L o u n g e C u s t o m e r 12 0% 0 10 % 1 30 % 4 10 % 1 10 % 1 5% 1 10 0 % 12 10 0 % 12 33 % 4 10 % 1 10 % 1 30 % 4 55%7 60%7 70%8 67%8 60%7 40%5 30%4 Re s t a u r a n t C u s t o m e r 48 0% 0 10 % 5 30 % 14 10 % 5 10 % 5 5% 2 10 0 % 48 10 0 % 48 33 % 16 10 % 5 10 % 5 30 % 14 55%26 60%29 70%34 67%32 60%29 40%19 30%14 Ba l l r o o m / A s s e m b l y C u s t o m e r 46 0% 0 0% 0 30 % 14 60 % 28 60 % 28 60 % 28 65 % 30 65 % 30 65 % 30 65 % 30 65 % 30 10 0 % 46 100%46 100%46 100%46 100%46 50%23 0%0 0%0 Of f i c e ( A d m i n ) V i s i t o r s 1 0% 0 1% 0 20 % 0 60 % 0 10 0 % 1 45 % 0 15 % 0 45 % 0 10 0 % 1 45 % 0 15 % 0 10 % 0 5%0 2%0 1%0 0%0 0%0 0%0 0%0 Em p l o y e e s 7 3% 0 30 % 2 75 % 6 95 % 7 10 0 % 7 10 0 % 7 90 % 7 90 % 7 10 0 % 7 10 0 % 7 90 % 7 50 % 4 25%2 10%1 7%1 3%0 1%0 0%0 0%0 TO T A L 33 7 16 6 18 0 23 1 22 3 21 0 20 8 25 5 25 7 22 6 21 1 22 0 245 254 244 256 257 224 190 179 We e k d a y C o n d i t i o n s No o n 1: 0 0 P M Midnight 11:00 PM 5: 0 0 P M 4: 0 0 P M Re q u i r e d Pa r k i n g La n d U s e Va r a d e r o 10:00 PM 9:00 PM 8:00 PM 7:00 PM 6: 0 0 A M 7: 0 0 A M 8: 0 0 A M 9: 0 0 A M 10 : 0 0 A M Sh a r e d P a r k i n g A n a l y s i s B a s e d o n C i t y C o d e 11 : 0 0 A M 6:00 PM 2: 0 0 P M 3: 0 0 P M Ti m e - o f - D a y Ra t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a t e P a r k i n g R a te Parking Ho t e l - S t a n d a r d G u e s t 37 95 % 36 95 % 36 90 % 34 80 % 30 70 % 26 70 % 26 65 % 24 65 % 24 70 % 26 70 % 26 75 % 28 80 % 30 85%32 85%32 90%34 95%36 95%36 100%37 100%37 Em p l o y e e s 11 5% 1 30 % 3 90 % 10 90 % 10 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 10 0 % 11 90 % 10 75 % 8 60%6 55%6 55%6 55%6 45%5 45%5 30%3 Ho t e l - P a r k S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 75 % 1 60%1 55%1 55%1 55%1 45%1 45%1 30%0 Ho t e l - J u n i o r S u i t e s G u e s t 5 95 % 4 95 % 4 90 % 4 80 % 4 70 % 3 70 % 3 65 % 3 65 % 3 70 % 3 70 % 3 75 % 4 80 % 4 85%4 85%4 90%4 95%4 95%4 100%5 100%5 Em p l o y e e s 1 5% 0 30 % 0 90 % 1 90 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 10 0 % 1 90 % 1 75 % 1 60%1 55%1 55%1 55%1 45%1 45%1 30%0 Ap a r t m e n t H o t e l - 1 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 75 % 4 60%3 55%3 55%3 55%3 45%2 45%2 30%2 Ap a r t m e n t H o t e l - 2 B e d G u e s t 74 95 % 70 95 % 70 90 % 67 80 % 59 70 % 52 70 % 52 65 % 48 65 % 48 70 % 52 70 % 52 75 % 56 80 % 59 85%63 85%63 90%67 95%70 95%70 100%74 100%74 Em p l o y e e s 21 5% 1 30 % 6 90 % 19 90 % 19 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 10 0 % 21 90 % 19 75 % 16 60%13 55%11 55%11 55%11 45%9 45%9 30%6 Ap a r t m e n t H o t e l - 3 B e d G u e s t 19 95 % 18 95 % 18 90 % 17 80 % 15 70 % 13 70 % 13 65 % 12 65 % 12 70 % 13 70 % 13 75 % 14 80 % 15 85%16 85%16 90%17 95%18 95%18 100%19 100%19 Em p l o y e e s 5 5% 0 30 % 2 90 % 5 90 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 10 0 % 5 90 % 5 75 % 4 60%3 55%3 55%3 55%3 45%2 45%2 30%2 Sp a a n d F i t n e s s C u s t o m e r 19 80 % 15 45 % 8 35 % 7 50 % 9 35 % 7 50 % 9 50 % 9 30 % 6 25 % 5 30 % 6 55 % 10 10 0 % 19 95%18 60%11 30%6 10%2 1%0 1%0 0%0 (H e a l t h C l u b ) E m p l o y e e s 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 50 % 1 75 % 1 10 0 % 1 100%1 75%1 50%1 20%0 20%0 20%0 0%0 Ba r / L o u n g e C u s t o m e r 12 0% 0 10 % 1 30 % 4 10 % 1 10 % 1 5% 1 10 0 % 12 10 0 % 12 33 % 4 10 % 1 10 % 1 30 % 4 55%7 60%7 70%8 67%8 60%7 40%5 30%4 Re s t a u r a n t C u s t o m e r 48 0% 0 10 % 5 30 % 14 10 % 5 10 % 5 5% 2 10 0 % 48 10 0 % 48 33 % 16 10 % 5 10 % 5 30 % 14 55%26 60%29 70%34 67%32 60%29 40%19 30%14 Ba l l r o o m / A s s e m b l y C u s t o m e r 46 0% 0 0% 0 30 % 14 60 % 28 60 % 28 60 % 28 65 % 30 65 % 30 65 % 30 65 % 30 65 % 30 10 0 % 46 100%46 100%46 100%46 100%46 50%23 0%0 0%0 Of f i c e ( A d m i n ) V i s i t o r s 1 0% 0 20 % 0 60 % 0 80 % 1 90 % 1 10 0 % 1 90 % 1 80 % 1 60 % 0 40 % 0 20 % 0 10 % 0 5%0 0%0 0%0 0%0 0%0 0%0 0%0 Em p l o y e e s 7 0% 0 20 % 1 60 % 4 80 % 6 90 % 7 10 0 % 7 90 % 7 80 % 6 60 % 4 40 % 3 20 % 1 10 % 1 5%0 0%0 0%0 0%0 0%0 0%0 0%0 TO T A L 33 7 16 8 17 9 22 8 21 9 20 4 20 3 25 4 25 0 21 4 20 0 20 9 24 6 260 254 263 263 229 203 190 1 R e s i d e n t i a l h o u r l y p a r k i n g d e m a n d d i s t r i b u t i o n w a s a s s u m e d t o b e 1 0 0 % 2: 0 0 P M Va r a d e r o Sh a r e d P a r k i n g A n a l y s i s B a s e d o n C i t y C o d e We e k e n d C o n d i t i o n s La n d U s e Re q u i r e d Pa r k i n g Ti m e - o f - D a y 6: 0 0 A M 7 : 0 0 A M 8 : 0 0 A M 9 : 0 0 A M 1 0 : 0 0 A M 1 1 : 0 0 A M N o o n 1 : 0 0 P M 9:00 PM 10:00 PM 11:00 PM Midnight 3: 0 0 P M 4 : 0 0 P M 5 : 0 0 P M 6 : 0 0 P M 7 : 0 0 P M 8 : 0 0 P M 1 | P a g e Responses to the Corradino Comments on Behalf of the City of Sunny Isles Beach (November 5, 2015) Re: Varadero Traffic Study 1. Appendix A / Site Plan – Highlight the valet area and required stacking lengths on the north and south entrances for valet drop-off / pick-up area. Response: Attachment A shows the site plan highlighting the valet areas and stacking distances. 2. Exhibits 14A, 15A & 16A – Please explain how demand rates were calculated? Response: The project proposes three separate valet drop-off / pick-up stations that will be located at each proposed residential lobby and at the hotel lobby. Project trips were distributed based on the number of unit and the uses assigned to each drop-off / pick-up area. Project trips were assigned to each station as shown on Exhibit 13 of the traffic report. As mention in the report, parking for the development will be all valet except for 85 assigned residential parking spaces that will be self parking. The self parking represents 11% of the parking spaces provided for the residential component therefore a deduction was taken to account for the project trips (residential only) not using valet. An overall 10% deduction was applied to account for transit/ pedestrian trips. Calculations showing the PM peak demand for each valet station are included in Attachment B. 3. Please conduct a study to determine if a pedestrian access to the beach at south side of the intersection of Collins Avenue / 189th Street is feasible. Response: A study to determine the feasibility of an at-grade pedestrian crosswalk on Collins Avenue south of 189th Street will be conducted. The study will be conducted following the requirements of the reviewing agencies. Attachment C shows a proposed methodology based on discussions with FDOT staff at a meeting held November 4, 2015. 2 | P a g e Shared Parking Analysis 1. Exhibit 3 – Please provide source for monthly adjustment, non-captive adjustment and mode adjustment factors? Response: Monthly adjustments were obtained form Table 2-3 and 2-4 of the ULI Shared Parking, 2nd Edition. Tables are provided for reference in Attachment A of the revised shared parking analysis. Non-captive adjustments – as explained in the ULI Shared Parking, 2nd Edition formal studies and general engineering experience have proven that some reduction of customer parking needs occurs in projects due to patronage of multiple land uses. For example hotel guests are expected to use the restaurant, bar/lounge, spa/fitness center and ballroom. This “captive market” can represent between 15% and 20% of land use demand. However, to provide for a very conservative analysis, the study only applied a 5% reduction. Mode adjustments - ULI Shared Parking, 2nd Edition also recognizes that parking rates reflect conditions in suburban setting with little or no transit and minimal employee ridesharing. In a hotel setting, it is expected that a large percentage of guests will arrived via taxi, shuttle services and/or use ridesharing options such as Uber and Lyft. The area surrounding the project is also served by mass transit. There are approximately 4 bus routes in the vicinity of the project; in addition to the Sunny Isles Beach Community Shuttle. A percentage of the hotel employees are expected to use public transportation, carpool with other employees or be dropped-off. To account for this condition, a conservative 5% mode reduction was applied to hotel guest and customer, and 10% for hotel employees. 2. Exhibit 3 - Since residential parking is fixed, revise the shared parking analysis for the remaining land uses only. Response: Exhibit 3 has been revised as requested. 3. In the write-up separate the total parking between fixed residential parking and shared parking for the remaining land uses and make appropriate changes where needed. Response: The report text has been revised as requested. w:\15\15158\response to city comments.docx Drop-off / Pick-up Area In Out Total High Rise Residential Condominium 32 20 52 Health / Fitness Club 10 7 17 -4 -2 -6 -4 -3 -7 34 22 56 Hotel 19 17 36 Drinking Place 9 4 13 Quality Restaurant 24 12 36 Residential Condominium 37 18 55 -9 -5 -14 80 46 126 High Rise Residential Condominium 68 42 110 General Office 1 2 3 -7 -4 -11 55 35 90 Varadero Trip Generation - PM Peak Hour ATTACHMENT B 2 10% Transit / Pedestrian Station #2 PM Peak Demand PM Peak Hour Vehicle Trips 3 10% Transit / Pedestrian Station #3 PM Peak Demand 1 Station # 11% Self Parking (Residentail Only) 10% Transit / Pedestrian Station #1 PM Peak Demand ITE Land Use Designation Mid-block Pedestrian Crosswalk Collins Avenue south of 189th Street A traffic study will be conducted to determine if an at-grade signalized pedestrian crosswalk is warranted and feasible on Collins Avenue south of 189th Street in Sunny Isles Beach, Florida. In order for FDOT to consider a pedestrian crosswalk at this location the following three conditions must be met: •The pedestrian crosswalk should be warranted based on the pedestrian volumes and availability of any alternative crossing locations. •The safety characteristics of the crossing location and traffic operations of the adjacent roadway. •Design feasibility of the pedestrian crosswalk and control type. MID-BLOCK PEDESTRIAN CROSSWALK WARRANT ANALYSIS In order for a location to be considered for a mid-block crossing, the location shall meet all the criteria in Section 3.8.5(3) and 3.8.5(4) of the FDOT Traffic Engineering Manual (September 2014). Those criteria require a minimum number of pedestrians during an hour, minimum number of daily vehicular volume and a minimum distance between adjacent crosswalks. Forty-eight hour machine counts and speed data will be collected on a weekend (Saturday and Sunday) on Collins Avenue north and south of 189th Street as well as on the on-ramp and off- ramp of SR 856 (Lehman Causeway). Pedestrian counts will be collected for two consecutive days (Saturday and Sunday) from 8:00 am to 6:00 pm. Pedestrians will be counted at three locations: at the proposed mid-block crosswalk location, north of the proposed crosswalk and south of the proposed crosswalk. The data collected will be analyzed and compared against the threshold outline in Section 3.8.5(3) and 3.8.5(4) of the FDOT Traffic Engineering Manual to determine if a pedestrian crosswalk is warranted at this location. OPERATIONAL AND SAFETY ANALYSIS If a pedestrian crosswalk is warranted based on pedestrian volumes, an operational and safety analysis will be conducted. The safety analysis will determine if the location of the proposed pedestrian crosswalk meets adequate stopping sight distance, has proper illumination, requires a raised refuge area and meets ADA requirements. An operational analysis will be conducted on Collins Avenue to determine the impacts of the exclusive pedestrian signal phase on traffic operations. The operational analysis will be conducted using the Synchro software to determine the adjacent intersections LOS, delay and 95th percentile queue. ATTACHMENT C DESIGN FEASIBILITY Once it is determined by the reviewing agencies, that the proposed pedestrian crosswalk is warranted and does not impact the safety and operations of the adjacent roadways, a conceptual design of the crosswalk will be developed. The conceptual design will identify location of crosswalk, modification to existing signal, pedestrian signal equipment location, requirements for easements, signing/markings and roadway modifications. 1 DEMOLITION/CONSTRUCTION STAGING AND TRAFFIC MANAGEMENT PLANS PROJECT NAME: La Playa Beach Associates, LLC PROJECT ADDRESS/LOCATION: 18801 Collins Avenue, Sunny Isles Beach, FL SUBMITTAL DATE: November 2, 2015 PROJECT APPROVAL BY (CITY): ___________________________________ DATE: __________________________________________________________ Note: All Staging and Traffic Management Plan must be approved by Zoning, Building and the City Manager. Modifications may be permitted, if approved by the City Manager or his designee. 2 I. PROJECT (Briefly describe your project) La Playa Beach Associates, LLC is proposing a luxury development to be built on a 4.71-acre lot located at 18801 Collins Avenue, Sunny Isles Beach, Florida 33160. The project will consist of two towers. Both towers will be 649’ high and the parking garage will contain 1022 parking spaces. The south tower will be a mixed-use building with high-end residential condominium / Condo Hotel and Hotel components. The north tower will be a high-end residential condominium. Both towers will contain +/- 431 units, 60 Hotel units and 90 Condo Hotel Units. Provide Contact Information: Please include name, title, company, address, phone number, email, cell phone number. Development Team: Mr. Ron Choron Vice President of Construction La Playa Beach Associates, LLC 17070 Collins Avenue, Suite 267 Sunny Isles Beach, FL 33160 (786) 405-1056 office (786) 402-3610 cell rlchoron@fortuneintlgroup.com Construction Team: To be determined Other: Not applicable 3 II. Demolition Work/Excavation and Grading/Concrete Placement Work For purposes of this document, Demolition work was completed in June 2015, therefore, Demolition phase work is not included in this plan. Contractor Information: Please include name, company, address, phone number, email, cell phone number. To be determined Project Location: 18801 Collins Avenue, Sunny Isles Beach, FL 33160 Estimated Start Date: January 2017 Estimated Completion Date: December 2019 Hours of Operation: 1. On the majority of days, the contractor will comply with the Sunny Isles Beach Code of Ordinances, Chapter 193, Article III regarding Construction Noise, which limits the days and hours of work as follows: a. Standard time: 7:00 a.m. to 6:30 p.m. Monday through Thursday, 7:00 a.m. to 5:00 p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday b. Daylight savings time: 7:00 a.m. to 7:00 p.m. Monday through Thursday, 7:00 a.m. to 5:00 p.m. on Friday, and 9:00 a.m. to 5:00 p.m. on Saturday c. No construction activities shall take place on Sunday and on the following holidays: New Year's Day; Fourth of July; Labor Day; Yom Kippur; Thanksgiving Day; and, Christmas Day 2. As building construction can require some off-hour work, all night work, and unforeseeable circumstances beyond the control of the contractor, the contractor will comply with the City’s process for the Request for Waiver of Chapter 193 of the Code of the City of Sunny Isles Beach and notify all adjacent properties and submit applications for extended construction hours (see form, below). Some activities that will require extended construction hours include: a. Utility upgrades and tie-ins under Collins Avenue and adjacent sidewalk b. Heavy and/or large equipment and material delivery and removal c. Foundation dewatering d. 24-hour mat foundation concrete pour e. Activities where the safety of the public would be better served during off- hours work f. Emergencies and other unforeseeable events 4 5 Project Task: Describe project; include equipment to be used. Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional insured. All equipment will be modified to include OSHA-compliant “white-noise” back-up alarms to reduce construction site noise. 1. Utility upgrades and tie-ins under Collins Avenue, including: a. Electrical service b. Domestic water c. Fire water d. Sanitary e. Storm water f. Natural gas g. Telephone/data/cable tv All of which may require the following equipment: a. Backhoes/Excavators b. Loaders c. Trucks (dump trucks, concrete trucks, equipment trucks, etc.) d. Trailers e. Compaction equipment f. Sawcutting equipment g. Paving machines h. Directional boring equipment i. Pumps (both for dewatering and concrete) j. Street sweepers k. Generators 2. Site preparation, grading, and excavation: a. Backhoes/Excavators b. Loaders c. Bulldozers d. Motor graders e. Trucks (dump trucks, equipment trucks, etc.) f. Dewatering pumps g. Sand sifting equipment for beach sand relocation h. Water trucks i. Street sweepers j. Generators 3. Augered Cast-in-Place Pile installation: a. Cranes (crawler and hydraulic) b. Drill rigs c. Concrete trucks (for grout) d. Grout pumps e. Loaders 6 f. Trucks/Trailers (for reinforcing steel deliveries) g. Generators 4. Temporary shoring and excavation: a. Cranes (crawler and hydraulic) b. Drill rigs c. Pile-driving equipment d. Concrete trucks e. Trucks/Trailers f. Backhoes/Excavators g. Loaders/Dozers h. Dump Trucks i. Compaction equipment j. Dewatering pumps (diesel and electric) k. Generators 5. Mat foundation preparation and concrete pour: a. Cranes (tower, crawler, and hydraulic) b. Backhoes/Loaders c. Pumps (both for dewatering and concrete) d. Trucks (dump trucks, concrete trucks, equipment trucks, etc.) e. Trailers f. Concrete finishing equipment 6. Tower Crane and Man/Material Hoist Erection, Jumps, and Dismantling: a. Large crawler and hydraulic cranes (for tower crane and man/material hoist assembly and erection) b. Tower cranes (for tower crane and man/material hoist jumping) c. Large crawler and hydraulic cranes (for tower crane and man/material hoist dismantling) d. Generators e. Tractor trailers 7. Other concrete placement activities: a. Cranes (tower, crawler, and hydraulic) b. Concrete pumps c. Concrete trucks d. Truck/trailers e. Generators Additional Information (as applicable to project) Truck Route: Describe truck routes (attach route map), include number of trucks and staging location. 7 The number of trucks will vary greatly over the course of the project. During concrete operations, we expect a minimum of fifty (50) deliveries in the course of a typical day. The proposed truck route for the project will be as shown on the attached Traffic Pattern to Enter/Exit Jobsite. Most trucks, except for the foundation mat concrete trucks, will be staged on-site and not on Collins Avenue. The contractor will design project trucks routes within the property to allow for truck staging within the site. In addition, the contractor will have trained and certified flagmen (“gate attendants”) at each gate that will ensure no trucks stage on Collins Avenue and will allow trucks to exit the site with minimizing disruption to traffic. As at Jade Signature, our contractor will hold training sessions with all subcontractors and vendors to review the truck route and rules and regulations regarding truck deliveries. For example, at Jade Signature, the contractor has inserted language into all subcontracts and purchase orders requiring them to: 1. Fully comply with plans like this one, at all times 2. No delivery vehicles are allowed to make “u-turns” on Collins Avenue 3. No delivery vehicles are allowed to utilize side streets or commercial parking lots to make “turn-arounds” 4. No delivery vehicles are allowed to block Collins Avenue for any reason Material Storage Location: Describe the location for material storage (if needed). Any removal or relocation of sand, must be approved separately. It is our intention that some materials will be stored on-site, space permitting. Locations will vary throughout the course of the activities; however, the materials will remain inside the fenced construction site. Specifically for sand, we would ideally like to stock the sand on-site, sift (if required by FDEP) on-site, and place on the beach directly from our site. If this cannot occur due to FDEP and City requirements, like at Jade Signature, we will rent land in west Miami- Dade County, haul the excavated sand for storage at this land, sift the sand there, and wait for further instructions on sand placement from the City and FDEP. Construction Trailer: Will a construction trailer be used? If so, show location? Construction trailers (for both managers and materials/equipment) will be required on- site. Please see the proposed locations on-site, below: 8 Traffic Control: Will this operation require occupying any traffic lanes, parking lanes, beachwalks or any other public right-of way? If yes, closures shall be per the regulations described in the Maintenance of Traffic (MOT) from the Florida Department of Transportation (FDOT). Please note that a Lane Closure Permit from the Code Compliance Department must be obtained prior to public right-of-way use. Similar to Jade Signature, sidewalk and lane closures will be required for certain key activities, such as: Deliveries and removal of extremely large and heavy equipment; utility work within the right-of-way and Collins Avenue; and, the mat foundation concrete pour. Again, like Jade Signature, the contractor will go through the proper channels to obtain FDOT approval, City of Sunny Isles Beach approval, and have numerous meetings to coordinate the effort beforehand. Then, execute the MOT plan with all required signage, barriers/barricades, lighting, certified flagmen, police details, etc. The process that the contractor at Jade Signature followed was to: 1. Meet with FDOT to review requirements for the project, timing, locations, etc. and received advice on how best to prepare the MOT application including all applicable MOT plans. 2. Prepare a draft of the MOT plans and review this draft of the plans with the City of Sunny Isles Beach (Code Compliance Department and the Police Department) 3. Finalize the MOT plans as necessary to comply with comments provided by the City of Sunny Isles Beach. 4. Submit MOT application and plans to FDOT and follow-up with another face-to- face meeting with the inspector/plans approver to address any additional concerns. 5. Receive MOT plan approval from FDOT. 6. Submit MOT application and FDOT approval to the City of Sunny Isles Beach (both Code Compliance Department and Police Department). 7. Request City of Sunny Isles Beach Policer Officers as necessary to comply with the MOT Plan and protect the safety of the public. 9 We will require our contractor to prevent trucks and other equipment from blocking traffic without the required MOT plan enactment. Parking: Indicate the number of workers and the areas where their vehicles will be parked through the duration of this phase of the project. The number of workers will vary during the course of the project, but at the peak, we expect approximately 225 individual workers. As the number of available parking spots and vacant lots continues to decrease in and around Sunny Isles Beach, we will ensure that workers carpool as much as possible. Further, we will secure parking at the Haulover Beach parking lots and bus the workers from the parking location to the construction site, then back to their vehicles at the end of their shift. Clean-up: Describe the measures that will be taken to ensure that the work site and public right-of-way will be maintained (including dust control, swale on driveways to prevent water leaks to the street, gutter buddies, rocks at driveways, etc.) Similar to Jade Signature, we will require the contractor to keep the construction site safe and clean, including the immediate area outside the construction site to provide an environment safe for walking pedestrians and personal vehicles. Specific measures that will be taken to ensure a clean jobsite are: 1. Truck tire-wash areas at all project site exits prior to leaving the project. At Jade Signature, the contractor developed steel grating to allow all tire surfaces to be cleaned with the mud/dirt falling into the gaps in the grating, preventing this mud/dirt from flowing into the street (see photo, below). The tires will be cleaned using pressure washers to ensure full removal of mud/dirt/concrete. 10 2. Like at Jade Signature, rather than have gravel or stone entrances and exits to/from the construction site, we will have the contractor provide and maintain a reinforced concrete apron, which is much easier to clean and maintain as opposed to gravel/stone. On the jobsite side of the concrete aprons, the contractor will install the wash-down grating described above. 3. Curb inlets in Collins Avenue along the length of the site will receive erosion control measures in accordance with the soon to be prepared, submitted, and approved erosion control plan. There are various types of these curb gutter inlet sediment prevention devices and our contractor will coordinate with the City and FDOT. Additionally, the sediment that gets collected on the outside of the sediment prevention device will be cleaned daily to prevent clogging, water ponding, and sediment build up. 4. The full-time gate attendants will receive specific training on cleaning and maintenance. They will wash down, sweep, and remove any dirt, sediment, and debris, whether deposited from the jobsite or not. These full-time gate attendants will also keep all sidewalks clear, clean, and safe at all times and, like at Jade Signature, will be trained to deal with non-construction related pedestrian and vehicular traffic. 5. The contractor will set up numerous water sources on-site for project individuals to spray down the site to minimize wind-blown dirt/sand from leaving the project. During site preparation and grading, a water truck will be used to wet the site. Fencing: Construction fencing must be constructed of durable material, and additional silt fencing for additional protection. Gates should be steady and properly secure during non-working hours. We take great pride in the “face” of our construction sites (the fencing) and require our contractors to install temporary construction fencing that is constructed in a permanent manner and in accordance with the City of Sunny Isles Beach requirements. The fencing will be constructed of thick, durable plywood that will either be painted or receive fastener-attached metal panel signage (similar to Jade Signature). The plywood will be securely mounted to an engineered structural support system made of either solid wood posts and stringers or hollow structural steel (“HSS”) shapes embedded into holes and encased in concrete. The back side of the fence will be lined with silt fence to prevent sediment run-off from the jobsite, under the fence, onto the sidewalk or other adjacent areas. All gates will be sliding gates, rather than swinging gates, to ensure that the gates do not accidentally swing into the right-of-way due to the strong winds in Sunny Isles Beach. The gates will be constructed of the same materials as the fencing in order to match the fence and provide a consistent look for the project. All gates will be secured with high-strength pad locks when closed at the end of each day. During the day, we will have full-time attendants at all open gates to prevent unauthorized access and ensure the safety of the public. This may also include providing a “warning barrier” in 11 lieu of a closed gate, only during working hours. Finally, like at Jade Signature, we may light the fence-mounted signage, upon approval from the City of Sunny Isles Beach. Provide erosion sediment control plans, if applicable. As we currently have not selected a contractor at this time, we have not had erosion and sediment control plans prepared. They will be prepared by a licensed, registered professional and will be in accordance with all national, State, County, and City requirements. Once prepared, we will have the selected contractor provide copies to amend this plan and obtain all required permits. III. Public Beach Access Protection and Closure None required Contractor Information: Please include name, company, address, phone number, email, cell phone number. To be determined Project Location: 18801 Collins Avenue, Sunny Isles Beach, FL 33160 Estimated Start Date: not applicable Estimated Completion Date: not applicable Hours of Operation: not applicable Project Task: Describe how and what will be demolished; include equipment to be used. Not applicable Adjacent beach access available for public access: Signage, location, hours of operations, etc. Walkway protection details. Not Applicable 12 IV. Other Contractor Information: Please include name, company, address, phone number, email, cell phone number. To be determined Project Location: Estimated Start Date: Estimated Completion Date: Hours of Operation: Project Task: Describe how and what will be demolished; include equipment to be used. Note: Copy of liability insurance with the City of Sunny Isles Beach as an additional insured. 13 TRUCK ROUTE(S) Please attach Route Map CONSTRUCTION TRAILERS TEMP WELLS DEWATERING TANKS DUMPSTERS TOWER CRANE TOWER CRANE CONCRETE WASHOUTS ENTRANCE / PROTECTIVE WALKWAY ENTRANCE / PROTECTIVE WALKWAY TOILETS TOILETS SITE ROAD TEMP POWER TRANSFORMER PHASE 1 VARADERO SITE LOGISTICS PLAN PHASE 1 DUMPSTERS 10/02/15 SITE EXIT (30 FT) SITE ENTRANCE (30 FT) TEMPORARY CONSTRUCTION FENCE CONSTRUCTION FENCE (PLYWOOD) TIRE SCRUBBERS 180 ft radius 135 ft radiu s (refer to schedule for start/finish and durations) PHASE 2 VARADERO SITE LOGISTICS PLAN PHASE 2 10/02/15 TOWER CRANE (115 FT RADIUS) TOWER CRANE (85 FT RADIUS) TEMP WELLS & DEWATERING TANKS CONSTRUCTION TRAILERS BUCKHOIST DUMPSTERS CONCRETE WASHOUTS SITE ROAD DUMPSTER TEMP POWER TRANSFORMER (SAME LOCATION AS PHASE 1) PROTECTIVE WALKWAY TIRE SCRUBBERS SITE EXIT (30 FT) SITE ENTRANCE (30 FT) CONSTRUCTION FENCE (PLYWOOD) TOILETS BUCKHOIST TOILET (refer to schedule for start/finish and durations) PHASE 1 VARADERO SITE LOGISTICS PLAN PHASE 1 & PHASE 2 10/02/15 PHASE 2 (refer to schedule for start/finish and durations)