Loading...
HomeMy WebLinkAboutCurtis & Rogers DesignsCURTIS + ROGERS DESIGN STUDIO, INC [ table of contents ] 01 | Minimum Requirements 02 | Additional Requirements 03 | Attachments 1. Background + History - Curtis + Rogers - Coastal Systems International - Lisa Hammer Horticulturalist 2. Organizational Chart 3. Standard 330 Forms 4. Current Schedule of Fees 5. Minority/Women (M/WBE) Certification 1. Addenda Acknowledgment Form 2. Non-Collusion Affidavit 3. Public Entity Crimes 4. Equal Opportunity/Affirmative Action Statement 5. Conflict of Interest Statement 6. Dispute Disclosure Form 7. Anti-Kickback Affidavit 00 2.4.1 Licenses + Authorization 2.4.2 State of Florida Registration 2.4.3 List of Experience 2.4.4 Client References CURTIS + ROGERS DESIGN STUDIO, INC [ minimum requirements ] 01 01 | Minimum Requirements 2.4.1 Licenses + Authorization 2.4.2 State of Florida Registration 2.4.3 List of Experience 2.4.4 Client References Curtis + Rogers Design Studio LA Licenses 2016 01 01 | 2 . 4 . 1 L i c e n s e s + A u t h o r i z a t i o n Curtis + Rogers Design Studio State of Florida Registration 01 01 | 2 . 4 . 2 S t a t e o f F l o r i d a R e g i s t r a t i o n State of Florida Department of State I certify from the records of this office that CURTIS & ROGERS DESIGN STUDIO, INC. is a corporation organized under the laws of the State of Florida, filed on October 23, 1991. The document number of this corporation is S89127. I further certify that said corporation has paid all fees due this office through December 31, 2016, that its most recent annual report/uniform business report was filed on January 4, 2016, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Fourth day of January, 2016 Tracking Number: CC4955432713 To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication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| 2.4.3 List of Experience Curtis + Rogers Design Studio, Inc. Curtis + Rogers Design Studio has extensive experience working with municipalities, its businesses and residents, and ultimately completing projects that meet the expectations of those we serve. In addition, Curtis + Rogers has experience in the complete development of projects from conceptual designs, through implementation and close-out. Our practice is founded on a collaborative approach which stresses interaction between our firm, clients, the community and fellow design professionals in order to achieve excellence in design. We believe the strongest design solutions come from a spirit of collaboration and collective vision. We strive to maintain successful partnerships with not only our clients but with our esteemed colleagues. It is important that the initial project goals be formulated and tested as the project proceeds in development. In that, continuous involvement is critical as project milestones are reached. Ultimately the goal of every project is to meet the expectations of the client and provide enhancement of areas for user enjoyment. Understanding the community objectives is a critical part of this process. The following chart is some of the most recent municipal projects / clients our firm has been involved with: Project Name Client Completion Date Design/Construction Samson Park City of Sunny Isles Beach August 2015 / Fall 2016 Garden of the Arts City of Hialeah Sept. 2014 / June 2015 Flagler Streetscape City of Miami February 2015 / Sept. 2017 Coconut Grove Streets- cape Commodore Plaza City of Miami April 2012 / October 2014 Gibson Park City of Miami March 2013 / January 2015 01 01 | 2 . 4 . 3 L i s t o f E x p e r i e n c e CURTIS + ROGERS DESIGN STUDIO, INC Client References Curtis + Rogers Design Studio City of Coral Gables Tree Succession Mr. Ernesto Pino 2800 SW 72nd Avenue – Coral Gables, Florida 33155 305 460 5004 epino@coralgables.com Samson Park; City of Sunny Isles Ms. Elka Linton-Dorsett 18070 Collins Avenue – Sunny Isles Beach, Florida 33160 305 792 1939 edorsett@sibfl.ney Garden of the Arts Mr. Vincent Rodriguez 501 Palm Avenue – Hialeah, Florida 33010 305 687 2620 vrodriguez@hialeahfl.gov 01 01 | 2 . 4 . 4 C l i e n t R e f e r e n c e s CURTIS + ROGERS DESIGN STUDIO, INC Client References Coastal Systems Internation Jade Signature Beach Nourishment Sunny Isles Beach Associates, LLC. Ron Choron 1300 Brickell Avenue - Miami, Florida 33131 305 351 1000 richcoron@fortune-network.com Beachwalk II City of Miami Beach Elizabeth Wheaton 1700 Convention Center Drive - Maimi Beach, Florida 33139 305 673 7080- x 6121 elizabethwheaton@miamibeachfl.gov Kennedy Park Shoreline Stabilization City of Miami Carlos Vasquez 444 SW 2nd Avenue – Miami, Florida 33130 305 416 1206 cavasquez@miamigov.com 01 01 | 2 . 4 . 4 C l i e n t R e f e r e n c e s CURTIS + ROGERS DESIGN STUDIO, INC [ additional requirements ] 02 | Additional Requirements 1. Background + History - Curtis + Rogers - Coastal Systems International - Lisa Hammer Horticulturalist 2. Organizational Chart 3. Standard 330 Forms 4. Current Schedule of Fees 5. Minority/Women (M/WBE) Certification 02 CURTIS + ROGERS DESIGN STUDIO, INC Background Information Curtis + Rogers Design Studio 02 Curtis + Rogers Design Studio, is a minority owned company licensed in the State of Florida to provide landscape architectural services. The firm is organized as a “S” Corporation The firm formed in 1991, by Aida M. Curtis and Richard H. Rogers, is well known throughout South Florida for providing, award - winning landscape architectural services. In 2006, Jean C. Lee, also a registered landscape architect, became a firm principal. The firm is a Hispanic-Female owned company, certified by numerous municipalities throughout the state. Mr. Richard Rogers has retired as of January 2014, but continues to consult with the firm and mentor on an as needed basis. Curtis + Rogers is celebrating its 25th year in existence. Our principals’ 54 years of combined experience with complex projects and the long-term relationships with our clients is testimony to our ability to create environments that engage the senses and lift the spirits while meeting the operational demands and functional realities of public projects. Our commitment to client service and excellence in design has led to numerous accolades including being honored as “Landscape Architects of the Year” in 2001 and 2009 by the Miami Chapter of the AIA. We have a staff of 8 professionals, including 4 registered landscape architects - 2 of them certified arborist and 2 LEED AP professionals and 1 administrative support person. Curtis + Rogers Design Studio has an internal mentoring program for all staff members. They are paired with seasoned professionals and mentored in all aspects of landscape architecture. In addition, educational support and encouragement is provided for professional growth. Most recently 2 professionals have become Certified Arborist and 3 of them have become Certified Landscape Inspectors. We are proud to have one of the lowest turnovers in the industry. Below you will see the longevity of our staff members: Staff Member Title Years started with C+R Years with C+R Jean Lee, LEED Owner/Principal Landscape Architect LEED AP 1999 to Present 17 years Gerald Marston Director of Design 2010 to Present 6 years Jennifer Rogers, LEED Landscape Architect Certified Arborist LEED AP 2005 to Present 11 years Julio Persivale Irrigation Designer 1999 to Present 17 years Tiffany Marston Landscape Designer 2012 to Present 4 years Barbara Diaz Marketing Coordinator 2001 to Present 15 years 02 . 1 | B a c k g r o u n d + H i s t o r y CURTIS + ROGERS DESIGN STUDIO, INC Background Information Curtis + Rogers Design Studio 02 The integration of sustainable site design and “green” concepts is at the core of Curtis + Rogers design expression. Having completed many of the first LEED projects in South Florida – first LEED school in Florida- Pine Jog Elementary, first LEED school in Miami-Dade County- Terra High School and first LEED building in the City of Miami- Melreese Golf Clubhouse. Curtis + Rogers is not only at the forefront of this movement in South Florida, but has the proven record of successfully completed projects. Office Location Curtis + Rogers Design Studio’s corporate offices are located at 7520 S Red Road in the City of South Miami, Florida. Curtis + Rogers also has a Broward office located at 3440 Hollywood Blvd., Hollywood, Florida to service our Broward clients. Our corporate office, will be handling the City of Sunny Isles Beach projects and providing project management and design services. 02 . 1 | B a c k g r o u n d + H i s t o r y Curtis + Rogers specializes in public/ municipal projects. Over the firms history we have worked with the GSA Administration- Federal Government on projects such as the Federal Courthouse in downtown Miami and the new FBI Office Building in Miramar – both projects part of their Design Excellence program. In addition we have worked for the Florida Department of Transportation in District 4, District 6 and the Turnpike, as well as the Miami Dade Expressway Authority. We have been involved in the development and renovation of countless schools for Palm Beach School District, Broward Schools, Miami-Dade Schools and Monroe County Schools. We have designed and built many parks for Miami Dade County, City of Miami, City of South Miami, Village of Pinecrest, City of Coral Springs, City of Doral, City of Miami Beach and City of Coral Gables. We have designed and constructed miles of roads and streets for the same entities as mentioned above. Our depth of experience, understanding of technical issues and public sector projects is an asset to every project we undertake. CURTIS + ROGERS DESIGN STUDIO, INC 02 02 . 6 | S u b - c o n s u l t a n t B a c k g r o u n d + H i s t o r y Sub-consultants | Background + Qualifications Coastal Systems International - Coastal Engineering Coastal Systems internation, inc. has an established reputation for planning effective strategies and delivering complex projects in coastal and other waterfronts environments. For over 20 years, Coastal Systems has helped clients relaize thier vision by engineering cost-effective solutions in the design of marinas, beached, coastal structures, environmental and habitat enhancements, public speace improvements and other specialized projects. We have amassed significant experience in completing projects with unique design and requiring construction under challenging conditions. From intial field investigations in hydrographic design and construction, we provide clients with a field-to-finsih solution. List of Municipalities completed work with: City of Coral Gables Miami Dade County City of Hallandale Beach Palm Beach County City of Hollywood Town of Hillsboro Beach City of Miami Town of Palm Beach City of Miami Beach Village of Bal Harbour City of Sarasota Village of Key Biscayne City of Sunny Isles Beach City of West Palm Beach Hillsboro Inlet District Martin County CURTIS + ROGERS DESIGN STUDIO, INC 02 02 . 6 | S u b - c o n s u l t a n t B a c k g r o u n d + H i s t o r y Sub-consultants | Background + Qualifications Lisa Hammer - Horticulturist Lisa H. Hammer has over 35 years of experience in all aspects of South Florida and Tropical Horticulture. She has served on the Board of Directors of recognized institutions such as the International Society of Arboriculture – Florida Chapter, the Florida Arborist Association, and the Florida State Horticultural Society, and several advisory committees of the American Society of Consulting Arborists (plant appraisal, editorial review, tree risk assessment). Ms. Hammer is one of the most respectable Horticultural Consultants, known for her accurate un-biased assessment of trees and palms. In addition to her horticultural background, she is a Registered Consulting Arborist (American Society of Consulting Arborists), Certified Arborist (International Society of Arboriculture), Qualified Tree Risk Assessor (ISA) and a State of Florida Certified Pest Control Operator. She has worked in developing specifications and manuals for new plantings, renovations of dated plantings, relocations and GREEN sustainable practices. She has worked for various municipalities in South Florida including City of Miami, City of Miami Beach, City of Coral Gables, Miami-Dade County Parks, and Miami-Dade County Schools among others. List of Municipalities completed work with: City of Coral Gables City of Fort Lauderdale City of Hollywood City of Homestead City of Miami City of Miami Beach City of Orlando Town of Golden Beach Town of Miami Lakes Village of El Portal Village of Key Biscayne CURTIS + ROGERS DESIGN STUDIO, INC 02 02 . 2 | O r g a n i z a t i o n a l C h a r t Organizational Chart Curtis + Rogers Design StudioCity of Sunny Isles Beach Landscape Architect Services RFQ -16-04-02 Curtis + Rogers Design Studio Subconsultants City of Sunny Isles Beach Gerald Marston, FASLA Design Landscape Architect Jennie Rogers, LEED AP Project Coordinator Landscape Architect TJ Marston, ASLA Landscape Designer Ralph Ferrer Landscape Designer Ruben Colon Landscape Designer Julio Persivale Irrigation Designer Jean Lee, LEED AP Support Principal Coastal Systems International Coastal + Civil Engineering Harvey Sasso, PE Arborist Horticultural Consultant Lisa Hammer Aida M. Curtis, ASLA Managing Principal Tab 2, Section 2 STANDARD FORM 330 (6/2004) PAGE 1 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Landscape Architect Service – City of Sunny Isles Beach 2. PUBLIC NOTICE DATE 04/05/2016 3. SOLICITATION OR PROJECT NUMBER RFQ# 16-04-02 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Aida M. Curtis - Principal 5. NAME OF FIRM Curtis + Rogers Design Studio, Inc. 6. TELEPHONE NUMBER 305 442 1774 7. FAX NUMBER 305 445 9488 8. E-MAIL ADDRESS aida@curtisrogers.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PR I M E J -V PA R T N E R SU B C O N - TR A C T O R a. x Curtis + Rogers Design Studio, Inc. 7520 S. Red Road, Suite M Miami, Florida 33143 Landscape Architecture CHECK IF BRANCH OFFICE b. x Coastal Systems International 464 South Dixie Highway Coral Gables, Florida 33146 Coastal Engineering Civil Engineering Marine Environmental CHECK IF BRANCH OFFICE X Lisa Hammer P.O. Box 330203 Miami, FL 33233 Horticultural Consultant D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) STANDARD FORM 330 (1/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Aida M. Curtis, RLA, ASLA 13. ROLE IN THIS CONTRACT Principal in Charge 14. YEARS EXPERIENCE a. TOTAL 27 b. WITH CURRENT FIRM 19 15. FIRM NAME AND LOCATION (City and State) Curtis + Rogers Design Studio, Inc. Miami , Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Texas A&M University Bachelor of Science of Landscape Architecture, 1983 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Landscape Architect: Florida, LA 0001330 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Affiliations: Member of The American Society of Landscape Architects / Awards: ASLA Certificate for Excellence in the study of Landscape Architecture 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) GSA- FBI Federal Office Building Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Curtis + Rogers is pleased to have conceived the “Everglades Landscape” concept for the GSA – Federal Office Building in Miramar Florida which was developed during the alternative concept phase of the project. The approach will not only greatly assist in successfully achieving credits for the sustainable sites initiative, but will create a unique and exciting approach to landscape design in South Florida. The following GSA Design Review Comments speak to their enthusiastic endorsement of the concept and their desire to see its successful implementation. Cost: $ 125 million b. (1) TITLE AND LOCATION (City and State) Miramar Cultural Center Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The Performing Arts and Cultural Center in the heart of the City of Miramar provides an important function within the City by providing the community a place for expression. Curtis + Rogers worked closely with an artist chosen by the Art in Public Places committee to successfully incorporate her exterior sculpture in becoming an integral part of the exterior landscaped spaces. The public open spaces will give the patrons of the center a place to congregate and a small performance space will allow for outdoor shows during most of the year. Cost: N/A c. (1) TITLE AND LOCATION (City and State) Flagler Streetscapes Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012-2014 CONSTRUCTION (If applicable) 2015-2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project goal is to reconfigure the Flagler Street from NW 2nd Ave to Biscayne Blvd, to provide wider sidewalks, selective parallel parking/loading areas, grading/drainage improvements, and landscape and hardscape enhancements commensurate with a vibrant downtown commercial area. The goal for these improvements is to provide areas for outdoor cafes, together with unified furnishings, lighting and landscape to enhance the visitor experience of the area. Flagler’s long historic significance has been taken into consideration in the planning and design of these improvements. Given that Flagler is the considered the City of Miami’s “main street”, many parties are involved in the planning and implementation of the project. The project is being managed by the City of Miami’s Capital Improvements Division (CIP), working in conjunction with the Downtown Development Authority (DDA), specifically with the Flagler Street Steering Committee. Cost: $ 8,800,000 d. (1) TITLE AND LOCATION (City and State) Garden of the Arts Park Hialeah, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013-2015 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Hialeah Cultural Park is envisioned to be a lush tropical park tucked into a quiet urban community. The neighborhood has little to no existing public space amenities, so the City of Hialeah working with FPL found a creative way to provide much needed green space. The land, donated by FPL, is an existing FPL transmission right-of-way currently not accessible to the public. FPL collaborated with our design team to create a park which fits the functional requirements of a transmission right-of-way while providing a meandering path through rich vegetation for people to stroll and learn about the rich history of Hialeah. The C+R team designed elements into the park plazas to enhance the story of Hialeah from its roots in the Native Americans who named Hialeah (meaning “High Prairie”) to the Hialeah Park Racetrack today and through the future. The landscape within the plazas will serve as a backdrop for local artists’ interpretive work throughout the park. Cost $2,000,000 e. (1) TITLE AND LOCATION (City and State) City of Coral Gables Tree Succession Plan Coral Gables, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2016 STANDARD FORM 330 (1/2004) PAGE 2 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Curtis + Rogers was hired by the City of Coral Gables to develop a Tree Succession and Initiation Plan for the trees in single family residential areas. The Curtis + Rogers’s team provided an evaluation of existing street trees, from a visual/horticultural conditions. The trees where mapped, identified and conditions were added to them, and areas where trees were missing were identified as possible locations for tree replacements. Over 38,800 trees were evaluated. Curtis + Rogers attended community meetings to seek input and present preliminary findings. Ultimately the team created maps for street planting themes, and listed the trees needing immediate replacement, identified locations for new trees and recommended others for further evaluation in 5 years. Over 2500 trees are being replaced. This plan enabled the City to develop a program for systematic replacement of trees to ensure the longevity of the canopy – which characterizes the City Beautiful. Cost: $3,000,000 for initial implementation STANDARD FORM 330 (1/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Gerald C. Marston, FASLA 13. ROLE IN THIS CONTRACT Director of Design 14. YEARS EXPERIENCE a. TOTAL 40 b. WITH CURRENT FIRM 3 15. FIRM NAME AND LOCATION (City and State) Curtis + Rogers Design Studio, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science in Landscape Architecture, Michigan State Master of Landscape Architecture, Harvard University 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Landscape Architect: Florida, LA 0000815 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Landscape Architects 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Fairchild Tropical Garden Master Plan Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 1998 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with Originally lay out by Fredrick Law Olmstead protégé William Lyman Phillips, Fairchild has grown to become one of the world’s foremost collections of palms and cycads, and an internationally recognized center for botanical studies and conservation. The plan for the Garden was developed in close collaboration with Garden staff. It restores and preserves the basic structure of the Phillips Plan, while making improvements to facilities and infrastructure to accommodate the Garden’s increasing visitor ship. The plan calls for a new orientation facility and improved parking at the Garden’s north end, providing opportunities for joint programs and interpretation of the native hammock areas in the adjacent County park. The Garden’s existing building complex was renovated as an Education Center, to better support these important Garden programs. The historic Phillips Gate, Fairchild’s original entrance, was also restored to serve as the entry for the Education Center and for special Garden events. Cost: N/A Gerald Marston. Director of Design for Curtis + Rogers, served as Principal-in-Charge for this Project while with Wallace Roberts & Todd, LLC b. (1) TITLE AND LOCATION (City and State) The Overtown Projects Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 1993-2010 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The Overtown Pedestrian includes the Main Plaza with the rising sun symbolizing the light, life and energy being directed to S.E. Overtown and the proposed Folklife Village. Constructed of rustic terrazzo in vibrant oranges, yellows, blues and greens, the plaza is punctuated with clusters of seating drums and commemorative bronze medallions documenting historic events within the Overtown Community. The pedestrian way under the Metrorail is paved with vibrant colored concrete unit pavers in an abstract pattern based on kente cloth weaving as practiced by nomadic peoples of West Africa and appropriately provides access to the Metrorail Station. In 2005 the Trust for Public Land retained Mr. Marston to create a master plan for the Overtown Greenway. After completion of the Masterplan, the Trust for Public Land authorized Mr. Marston to complete design development document for the Phase I Greenway on NW 11th Terrace from NW 3rd Avenue to NW 7th Avenue. Cost: 3 to 5 Million Gerald Marston. Director of Design for Curtis + Rogers, served as Principal-in-Charge for this Project while with Wallace Roberts & Todd, LLC c. (1) TITLE AND LOCATION (City and State) Flagler Street Improvements Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2005 CONSTRUCTION (If applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The Flagler Street Corridor Improvement Project rehabilitates Miami’s historic main street as the foundation for a revitalized downtown Miami. Named for Miami’s founder, Flagler Street was the original main street of the city and links the waterfront to a hub of civic institutions including the Miami Dade Court House, the Claude Pepper Federal Building, The Miami Historical Museum and the main branch of the Miami Public Library. Once the center of a major shopping district anchored by the flagship store of the department store chain Burdines, the street has deteriorated in recent decades. The objective of the Flagler Street Improvement Project was to restore six blocks of the street between the waterfront and the civic hub to a place of importance within the city by revealing the character of its distinctive architecture and its significant position within the urban fabric. Key to this objective was restoring two way traffic flow to improve access, reducing sidewalk clutter to ease congestion and facilitate outdoor dining and retail displays, and enhancing the street environment through street trees, improved lighting and distinctive paving. The design encompasses both the historic Miami Dade Court House and the Federal Building and sets the stage for the creation of a major urban plaza and transportation hub at the west end of the improvement district as well as connection to Bay Front Park at its east end. and construction began immediately. Cost: N/A Gerald Marston. Director of Design for Curtis + Rogers, served as Principal-in-Charge for this Project while with Wallace Roberts & Todd, LLC STANDARD FORM 330 (1/2004) PAGE 2 d. (1) TITLE AND LOCATION (City and State) Village of Key Biscayne Landscape Master Plan East End and Beach Parks Key Biscayne, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm We prepared a Landscape Master Plan for the entire Village of Key Biscayne, FL which enjoys outstanding natural beauty, a compelling sense of place, lush landscaping, and a unique small-town ambiance that leads many residents and visitors to call it “Island Paradise.” During the development of a comprehensive Landscape Master Plan, we worked closely with Village staff and the community to prepare a vision of the island that significantly enhanced streetscapes, parks, civic and open spaces with a well-maintained subtropical plant palette best suited to Key Biscayne’s sense of place. A major objective of the landscape master plan was to ensure the practice of responsible stewardship of the natural environment by protecting the existing tree canopy, natural habitats, beaches, dunes and near shore water quality. The master plan identified four “Early Action” projects, including East Enid Lake and Beach Parks, for which conceptual designs were prepared. Ultimately, we expanded the Village’s array of passive parks, open spaces and active recreation facilities through carefully directed property acquisition and redevelopment that includes small-scale neighborhood parks, aesthetically improved pedestrian, vehicular and bike ways and trails. Cost: N/A Gerald Marston. Director of Design for Curtis + Rogers, served as Principal-in-Charge for this Project while with Wallace Roberts & Todd, LLC e. (1) TITLE AND LOCATION (City and State) Vizcaya Museum and Gardens Master Plan and Orchidarium Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2002-2003 CONSTRUCTION (If applicable) 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Vizcaya, the winter home of International Harvester vice president James Deering, is one of South Florida’s leading attractions. Completed in 1916 in the Italian Renaissance style, the villa, its art and furnishings and gardens portray 400 years of European history. Nearly 200,000 people visit Vizcaya each year including some of the world’s leading dignitaries. In 1994, the historic Summit of the Americas was held at Vizcaya with President Clinton and the 34 leaders of the Western Hemisphere. Vizcaya’s significance to the history of the United States has lead to its designation as a National Historic Landmark. The Master Plan addressed the critical need to reconnect and integrate the estate with its “service“ village and the Museum of Science, and the restoration of Vizcaya’s extensive Italianate gardens. In addition to planning services the consultant was retained to design an outdoor gallery to display the museum’s orchid collection. In planning his winter estate, James Deering sent a note to his interior designer and artistic director for Vizcaya, saying that he wanted to grow orchids at his home: “My idea about orchids was to have a place where they could be raised for the use of the house,” he wrote. “I am very fond of them and would like an ample supply if it’s possible to have it.” Using a multimillion-dollar gift from the late David Klein, Vizcaya Museum and Gardens realized this intention by establishing an orchid collection housed in two new greenhouses and displayed in The David A. Klein Orchidarium. The gallery of orchids displays Vizcaya’s specimen orchids and is in keeping with the Italianate architecture of the National Historic Landmark. Cost:N/A Gerald Marston. Director of Design for Curtis + Rogers, served as Principal-in-Charge for this Project while with Wallace Roberts & Todd, LLC STANDARD FORM 330 (1/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jennifer Rogers 13. ROLE IN THIS CONTRACT Landscape Architect 14. YEARS EXPERIENCE a. TOTAL 8 b. WITH CURRENT FIRM 8 15. FIRM NAME AND LOCATION (City and State) Curtis + Rogers Design Studio, Inc. Miami Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) FIU – Masters of Landscape Architecture 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Landscape Architect: Florida LA-6667093 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Affiliations: Member of The American Society of Landscape Architects 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward Courthouse Ft. Lauderdale Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Curtis + Rogers was a part of the Master Plan process for the Broward Courthouse Complex. Currently under design is Phase 1 of that Master Plan which involves a new Courthouse Building and Plaza fronting SE 6th Street in Downtown Ft. Lauderdale. The Plaza has been designed to function as a public space for large and small civic gatherings, and the groups that typically gather in front of this institution, including vendors and families with children. Shade is provided by a grove of royal palms on the west side of the walkway that open up and climb the double set of stairs to the Courthouse Plaza. There is a small simple structural space for children to play in and shaded seating for parents. The plaza includes a smaller scale, shaded space to provide refuge from the activity in front of the courthouse which also provides handicap access to the building. This space is focused on a shaded inclined path that wraps around canopy trees as it climbs to the entry plaza, creating an intermediary platform halfway up for seating and gathering for individuals or a small group. Cost: $225 million b. (1) TITLE AND LOCATION (City and State) City of Coral Gables Tree Succession Plan Coral Gables, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Curtis + Rogers was hired by the City of Coral Gables to develop a Tree Succession and Initiation Plan for the trees in single family residential areas. The Curtis + Rogers team provided an evaluation of existing street trees, from a visual/horticultural conditions. The trees where mapped, identified and conditions were added to them, and areas where trees were missing were identified as possible locations for tree replacements. Over 38,800 trees were evaluated. Curtis + Rogers attended community meetings to seek input and present preliminary findings. Ultimately the team created maps for street planting themes, and listed the trees needing immediate replacement, identified locations for new trees and recommended others for further evaluation in 5 years. Over 2500 trees are being replaced. This plan enabled the City to develop a program for systematic replacement of trees to ensure the longevity of the canopy – which characterizes the City Beautiful. Cost:$2,500,000 -$3,000,000 for initial implementation c. (1) TITLE AND LOCATION (City and State) Coconut Grove Streetscape Improvements Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The goal of the project was to review the existing problems with brick lifting and root intrusions in the sidewalks and evaluate existing tree conditions, while maintaining the existing wonderful character of Coconut Grove. A combination of solutions have been proposed and include new trees planted in conditions optimal for future growth, maintaining existing trees while improving their immediate growing environment and replacement of bricks set in a more suitable base material. Cost $6,000,000 Phase I d. (1) TITLE AND LOCATION (City and State) Pine Jog Elementary / FAU Nature Center Facility Palm Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Located in an ecologically sensitive pineland area as well as being the first LEED project for the Palm Beach School District, Pine Jog Elementary uses the context of its surroundings and the objectives of the FAU Nature Center Facility to create an environmentally sensitive educational program to teach children as well as the school staff and the general public about the benefits of sustainable building. The landscape uses 100% native plants which are ecologically appropriate to a pineland habitat in this area of Florida and has significantly reduced the amount of potable water used for irrigation. Cost: $30.000,000 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED STANDARD FORM 330 (1/2004) PAGE 2 Aventura Arts & Cultural Center Miami, Florida PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Curtis + Rogers did the landscape, irrigation and LEED Design for this new Performing Arts Center for the City of Aventura. The Center is sited at the end of a spit of land overlooking Dumbfounding Bay. This LEED certified project required Shoreline Review and special planting considerations because of LEED and its location next to the Bay. Cost: $7,750,000 (1) TITLE AND LOCATION (City and State) Flagler Streetscapes Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 - 2014 CONSTRUCTION (If applicable) 2015-2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project goal is to reconfigure the Flagler Street from NW 2nd Ave to Biscayne Blvd, to provide wider sidewalks, selective parallel parking/loading areas, grading/drainage improvements, and landscape and hardscape enhancements commensurate with a vibrant downtown commercial area. The goal for these improvements is to provide areas for outdoor cafes, together with unified furnishings, lighting and landscape to enhance the visitor experience of the area. Flagler’s long historic significance has been taken into consideration in the planning and design of these improvements. Given that Flagler is the considered the City of Miami’s “main street”, many parties are involved in the planning and implementation of the project. The project is being managed by the City of Miami’s Capital Improvements Division (CIP), working in conjunction with the Downtown Development Authority (DDA), specifically with the Flagler Street Steering Committee. Cost: $ 8,800,000 STANDARD FORM 330 (1/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Tiffany Marston 13. ROLE IN THIS CONTRACT Landscape Designer 14. YEARS EXPERIENCE a. TOTAL 7 b. WITH CURRENT FIRM 3 15. FIRM NAME AND LOCATION (City and State) Curtis + Rogers Design Studio, Inc. South Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) University of Pennsylvania Master of Landscape Architecture 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 1st Price-ULI Urban Design Competition 2008 2008 Wallace Roberts & Todd Fellowship Award 2008 Olin Partnership Fellowship Award Faculty Nominee 2010 Selected for LAAB Accreditation Exhibition of Student Work 1st Prize-Senior Design Award (AIA Toledo Chapter) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Garden of the Arts Park Hialeah, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013-2015 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Hialeah Cultural Park is envisioned to be a lush tropical park tucked into a quiet urban community. The neighborhood has little to no existing public space amenities, so the City of Hialeah working with FPL found a creative way to provide much needed green space. The land, donated by FPL, is an existing FPL transmission right-of-way currently not accessible to the public. FPL collaborated with our design team to create a park which fits the functional requirements of a transmission right-of-way while providing a meandering path through rich vegetation for people to stroll and learn about the rich history of Hialeah. The C+R team designed elements into the park plazas to enhance the story of Hialeah from its roots in the Native Americans who named Hialeah (meaning “High Prairie”) to the Hialeah Park Racetrack today and through the future. The landscape within the plazas will serve as a backdrop for local artists’ interpretive work throughout the park. Cost $2,000,000 b. (1) TITLE AND LOCATION (City and State) Flagler Streetscapes; Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012-2014 CONSTRUCTION (If applicable) 2015-2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project goal is to reconfigure the Flagler Street from NW 2nd Ave to Biscayne Blvd, to provide wider sidewalks, selective parallel parking/loading areas, grading/drainage improvements, and landscape and hardscape enhancements commensurate with a vibrant downtown commercial area. The goal for these improvements is to provide areas for outdoor cafes, together with unified furnishings, lighting and landscape to enhance the visitor experience of the area. Flagler’s long historic significance has been taken into consideration in the planning and design of these improvements. Given that Flagler is the considered the City of Miami’s “main street”, many parties are involved in the planning and implementation of the project. The project is being managed by the City of Miami’s Capital Improvements Division (CIP), working in conjunction with the Downtown Development Authority (DDA), specifically with the Flagler Street Steering Committee. Cost: $ 8,800,000 c. (1) TITLE AND LOCATION (City and State) Coral Gables Tree Succession Plan; Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Curtis + Rogers were hired by the City of Coral Gables to develop a Tree Succession and Initiation Plan for the trees in single family residential areas. The Curtis + Rogers’s team provided an evaluation of existing street trees, from visual/horticultural conditions. The trees where mapped, identified and conditions were added to them, and areas where trees were missing were identified as possible locations for tree replacements. Over 38,800 trees were evaluated. Curtis + Rogers attended community meetings to seek input and present preliminary findings. Ultimately the team created maps for street planting themes, and listed the trees needing immediate replacement, identified locations for new trees and recommended others for further evaluation in 5 years. Over 2500 trees are being replaced. This plan enabled the City to develop a program for systematic replacement of trees to ensure the longevity of the canopy – which characterizes the City Beautiful. Cost: $3,000,000 for initial implementation d. (1) TITLE AND LOCATION (City and State) Samson Park Sunny Isles, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013-2015 CONSTRUCTION (If applicable) N/A STANDARD FORM 330 (1/2004) PAGE 2 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm One of the last remnant parks displaying the historic art-deco architecture in Sunny Isles, this oceanfront park in the heart of the city required a new functional design sensitive to its historic elements and the natural ecology of the area. C+R designed a new playground, stage area, and concert lawn area to be woven into the existing fabric of the park. Sensitivity to ecological conditions were taken with careful lighting design around this sea turtle nesting site and protection and maintenance of the established dune vegetation. The park is scheduled to be completed in 2015. Cost: $2,800,000 STANDARD FORM 330 (1/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Julio Persivale 13. ROLE IN THIS CONTRACT Auto Cadd / Irrigation Designer 14. YEARS EXPERIENCE a. TOTAL 19 b. WITH CURRENT FIRM 13 15. FIRM NAME AND LOCATION (City and State) Curtis + Rogers Design Studio, Inc. Miami, Fl 16. EDUCATION (DEGREE AND SPECIALIZATION) American Technical Institute – CADD Technician Universidad de Lima, Peru- Systems Engineer 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Coconut Grove Streetscape Improvements Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The goal of the project was to review the existing problems with brick lifting and root intrusions in the sidewalks and evaluate existing tree conditions, while maintaining the existing wonderful character of Coconut Grove. A combination of solutions have been proposed and include new trees planted in conditions optimal for future growth, maintaining existing trees while improving their immediate growing environment and replacement of bricks set in a more suitable base material. Cost $6,000,000 Phase I b. (1) TITLE AND LOCATION (City and State) Gibson Park Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010-2012 CONSTRUCTION (If applicable) n/a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Landscape architectural services for this design-build urban community park’s redevelopment included a synthetic turf football field, covered accessible playground, picnic shelters, vita course trail, a splash park and a pool. The park was originally opened in 1980 and named for Pastor Theodore Gibson, but had fallen into disrepair. The residents of the historic Overtown neighborhood of Miami are very excited to have their park back and much improved. The bright colors pay homage to the Bahamian ancestry of the founders of Overtown. Cost: 9,794,667.00 c. (1) TITLE AND LOCATION (City and State) Flagler Streetscapes Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012-2014 CONSTRUCTION (If applicable) 2015-2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm The project goal is to reconfigure the Flagler Street from NW 2nd Ave to Biscayne Blvd, to provide wider sidewalks, selective parallel parking/loading areas, grading/drainage improvements, and landscape and hardscape enhancements commensurate with a vibrant downtown commercial area. The goal for these improvements is to provide areas for outdoor cafes, together with unified furnishings, lighting and landscape to enhance the visitor experience of the area. Flagler’s long historic significance has been taken into consideration in the planning and design of these improvements. Given that Flagler is the considered the City of Miami’s “main street”, many parties are involved in the planning and implementation of the project. The project is being managed by the City of Miami’s Capital Improvements Division (CIP), working in conjunction with the Downtown Development Authority (DDA), specifically with the Flagler Street Steering Committee. Cost: $ 8,800,000 d. (1) TITLE AND LOCATION (City and State) Southpointe Streetscapes Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION (If applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Right of way and infrastructure improvement program for a neighborhood in Miami Beach. The neighborhood is within a historic district and it is comprised by multi-family residential and a commercial section. The improvement program consists of renovation and enhancement of the streetscapes- lighting, sidewalks, landscaping and furnishings. Extensive public participation was secured throughout the process. Cost: $ 6,126,654 e. (1) TITLE AND LOCATION (City and State) Garden of the Arts Park Hialeah, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013-2015 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Hialeah Cultural Park is envisioned to be a lush tropical park tucked into a quiet urban community. The neighborhood has little to no existing public space amenities, so the City of Hialeah working with FPL found a creative way to provide much needed green space. The land, donated by FPL, is an existing FPL transmission right-of-way currently not accessible to the public. FPL collaborated with our design team to create a park which fits the functional requirements of a transmission right-of-way while providing a meandering path through rich vegetation for people to stroll and learn about the rich history of Hialeah. The C+R team designed elements into the park plazas to enhance the story of Hialeah from its roots in the Native Americans who named Hialeah (meaning “High Prairie”) to the Hialeah Park Racetrack today and through the future. The landscape within the plazas will serve as a backdrop for local artists’ interpretive work throughout the park. Cost $2,000,000 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Samson Park Miami, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2014-2015 CONSTRUCTION (If applicable) 2016 3. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Sunny Isles b. POINT OF CONTACT NAME Elka Linton-Dorsett c. POINT OF CONTACT TELEPHONE NUMBER 305 792 1939 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) One of the last remnant parks displaying the historic art-deco architecture in Sunny Isles, this oceanfront park in the heart of the city required a new functional design sensitive to its historic elements and the natural ecology of the area. C+R designed a new playground, stage area, and concert lawn area to be woven into the exist ing fabric of the park. Sensitivity to ecological conditions were taken with careful lighting design around this sea turtle nesting site and protection and maintenance of the established dune vegetation. The park is scheduled to be completed in 2015. Cost: $ 2,800,000 25. FIRMS ECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Broward County Children’s Reading Center & Museum Davie Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2009-2011 CONSTRUCTION (If applicable) 2012 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Broward County Florida Public Works & Transportation Dept. Construction Management Division 115 S Andrews Ave. Room 600 Ft. Lauderdale, Fl 33301 b. POINT OF CONTACT NAME Jeffrey Thompson c. POINT OF CONTACT TELEPHONE NUMBER 954-357-8460 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Broward County Children’s Reading Center and Museum is comprised of a world-class Children’s Museum administered by Young at Art, an organization that has been encouraging and teaching children about art for 23 years, and a state-of- the-art Reading Center for children run by the Broward County Public Library System. The Center is the first LEED Gold certified museum in Broward County, Florida and has won awards from USGBC for “Outstanding LEED-NC (New Construction) -- Public” category as well as the “Outstanding LEED-NC – Overall” for 2012, a the Town of Davie award for “Greening Your Scene”. Curtis + Rogers provided the landscape and irrigation design services for this project, as well as the LEED documentation for relevant credits. The landscape design includes unusual circular berms, and an extensive selection of unusual and exotic trees to stimulate and educate the children. Curtis + Rogers developed educational flyers for the visitors to the museum that take them on a treasure hunt to find the trees, and identify their unique qualities. The landscape and irrigation were also designed to reduce water use by 59%, and 70% of the plants are native and drought tolerant, helping to achieve the LEED Gold Status. Cost: $ 13,300,000 Size: 10,000 sq. ft. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Broward Courthouse Ft. Lauderdale, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2010-2013 CONSTRUCTION (If applicable) 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Broward County b. POINT OF CONTACT NAME Daniel Ayers, Project Manager IV c. POINT OF CONTACT TELEPHONE NUMBER 954 - 357-5638 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Curtis + Rogers was a part of the Master Plan process for the Broward Courthouse Complex. Currently under design is Phase 1 of that Master Plan which involves a new Courthouse Building and Plaza fronting SE 6th Street in downtown Ft. Lauderdale. The Plaza has been designed to function as a public space for large and small civic gatherings, and for the groups that typically gather in front of this institution, including vendors and families with children. Shade is provided by a grove of royal palms on the west side of the walkway that open up and climb a double set of stairs to the Courthouse Plaza. There is a small simple structural space for children to play in and shaded seating for parents. The plaza includes a smaller scale, shaded space to provide refuge from the activity in front of the courthouse which also provides handicap access to the building. This space is focused on a shaded inclined path that wraps around canopy trees as it climbs to the entry plaza, creating an intermediary platform halfway up for seating and gathering for individuals or for a small group. Size: 400,000.00 sq.ft. Cost: $ 225 Million LEED Under Construction: Silver Rating 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Garden of the Arts Park Hialeah, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2013-2015 CONSTRUCTION (If applicable) 2015 3. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Hialeah 900 East 56 St, Bldg. 1 Hialeah, Florida b. POINT OF CONTACT NAME Vincente Rodriguez c. POINT OF CONTACT TELEPHONE NUMBER 305-687-2620 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Garden of the Arts Park is envisioned to be a lush tropical park tucked into a quiet urban community. The neighborhood has little to no existing public space amenities, so the City of Hialeah working with FPL found a creative way to provide much needed green space. The land, donated by FPL, is an existing FPL transmission right-of-way currently not accessible to the public. FPL collaborated with our design team to create a park which fits the functional requirements of a transmission right-of-way while providing a meandering path through rich vegetation for people to stroll and learn about the rich history of Hialeah. The C+R team designed elements into the park plazas to enhance the story of Hialeah from its roots in the Native Americans who named Hialeah (meaning “High Prairie”) to the Hialeah Park Racetrack today and through the future. The landscape within the plazas will serve as a backdrop for local artists’ interpretive work throughout the park. Cost: $2,000,000 25. FIRMS ECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) Flagler Streetscapes Miami, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2012-2014 CONSTRUCTION (If applicable) 2015-2017 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Capital Improvements Program 444 S.W. 2nd Avenue, 8th Floor Miami, Florida 33130 b. POINT OF CONTACT NAME Ms. Elia Nuñez, P.E. c. POINT OF CONTACT TELEPHONE NUMBER (305) 416-1280 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) . The project goal is to reconfigure the Flagler Street from NW 2nd Ave to Biscayne Blvd, to provide wider sidewalks, selective parallel parking/loading areas, grading/drainage improvements, and landscape and hardscape enhancements commensurate with a vibrant downtown commercial area. The goal for these improvements is to provide areas for outdoor cafes, together with unified furnishings, lighting and landscape to enhance the visitor experience of the area. Flagler’s long historic significance has been taken into consideration in the planning and design of these improvements. Given that Flagler is the considered the City of Miami’s “main street”, many parties are involved in the planning and implementation of the project. The project is being managed by the City of Miami’s Capital Improvements Division (CIP), working in conjunction with the Downtown Development Authority (DDA), specifically with the Flagler Street Steering Committee. Cost: $ 8,800,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) Gibson Park Miami, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2010-2014 CONSTRUCTION (If applicable) 2015 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Capital Improvements Program 444 SW 2nd Avenue, 8th Floor Miami, Fl. 33130 b. POINT OF CONTACT NAME Carlos Vasquez c. POINT OF CONTACT TELEPHONE NUMBER (305) 416-1206 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Landscape architectural services for this design-build urban community park’s redevelopment included a synthetic turf football field, covered accessible playground, picnic shelters, vita course trail, a splash park and a pool. The park was originally opened in 1980 and named for Pastor Theodore Gibson, but had fallen into disrepair. The residents of the historic Overtown neighborhood of Miami are very excited to have their park back and much improved. The bright colors pay homage to the Bahamian ancestry of the founders of Overtown. Scope: Landscape, Hardscape, Amenities and Irrigation Design Construction Documents; Construction Administration. Cost: $9,794,667.00 – Size: 407,350 sq. ft. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) Aventura Arts and Cultural Center Aventura, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2008-2010 CONSTRUCTION (If applicable) 2010 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Aventura 19200 W. Country Club Drive Aventura, Florida 33180 b. POINT OF CONTACT NAME Antonio F. Tomei c. POINT OF CONTACT TELEPHONE NUMBER 305 446 8923 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Curtis + Rogers designed the Landscape 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect Curtis + Rogers designed the Landscape and Irrigation for this new Performing Arts Center for the City of Aventura. The Center is perched at the end of a spit of land overlooking Dumbfoundling Bay. This LEED (Leadership in Energy and Environmental Design) certified project required Shoreline Review and special planting considerations because of its location next to the Bay as well as LEED principles. Salt and drought tolerant plantings were used along with a reduction in water use to create a signature landscape for this cultural facility. This project was a finalist in the 2011 ULI (Urban Land Institute) Southeast Florida Vision Awards. Cost: $ 7,750,000 Size: 13,000 sq ft. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) GSA New U. S. Federal Office Building Miramar, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2015 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER U.S. General Service Administration (GSA) b. POINT OF CONTACT NAME Lawrence R Hales, Contracting Officer c. POINT OF CONTACT TELEPHONE NUMBER 404 224-2314 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The landscape development of this site, which had been part of the Everglades in the 1900’s, was based on the idea of restoring this unique environment which still exists a few miles west of the site. The project site has been filled and prepared for development, however through careful planning we propose to remove some of this fill and restore and regenerate the previously lost ecosystem. This new landscape environment will serve to connect the undeveloped portions of South Florida, with the local community, by nestling this new Federal Building within this context. The landscape elements of the project are critical in that they will serve multi-faceted roles – the reestablishment of the relationship between the natural processes and the human activity, the treatment of storm water and its release to replenish lost wetlands, provision of habitats for plants and animals therefore contributing to the ecological diversity and contributing to the physical and mental well being of the users through their interaction with nature. Curtis + Rogers is pleased to have conceived the “Everglades Landscape” concept for the GSA – Federal Office Building in Miramar Florida which was developed during the alternative concept phase of the project. The approach will not only greatly assist in successfully achieving credits for the sustainable sites initiative, but will create a unique and exciting approach to landscape design in South Florida. The following GSA Design Review Comments speak to their enthusiastic endorsement of the concept and their desire to see its successful implementation. Cost: $ 136,000,000 – Size: 475,000 sq. ft. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Coconut Grove, Florida (3) ROLE Landscape Architect – Design Criteria Professional STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) Coral Gables Tree Succession Plan Coral Gables, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 05/08/2012 – 06/04/2014 CONSTRUCTION (If applicable) 06/01/15 – 12/01/16 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Coral Gables b. POINT OF CONTACT NAME Ernesto Pino c. POINT OF CONTACT TELEPHONE NUMBER 305 460 5004 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Curtis + Rogers was hired by the City of Coral Gables to develop a Tree Succession and Initiation Plan for the trees in single family residential areas. The Curtis + Rogers’s team provided an evaluation of existing street trees, from visual/horticultural conditions. The trees where mapped, identified and conditions were added to them, and areas where trees were missing were identified as possible locations for tree replacements. Over 38,800 trees were evaluated. Curtis + Rogers attended community meetings to seek input and present preliminary findings. Ultimately the team created maps for street planting themes, and listed the trees needing immediate replacement, identified locations for new trees and recommended others for further evaluation in 5 years. Over 2500 trees are being replaced. This plan enabled the City to develop a program for systematic replacement of trees to ensure the longevity of the canopy – which characterizes the City Beautiful. Cost: $3,000,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) Coconut Grove Streetscapes Improvements Coconut Grove, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES September 2010 -2014 CONSTRUCTION (If applicable) 2015 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Capital Improvements Program 444 S.W. 2nd Avenue, 8th Floor Miami, Florida 33130 b. POINT OF CONTACT NAME Hector Badia, Project Manager c. POINT OF CONTACT TELEPHONE NUMBER 305-416-1236 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami, hired Curtis + Rogers to provide design services related to streetscape renovations in the Coconut Grove Central Business District. The goal of the project was to review the existing problems with brick lifting and root intrusions in the sidewalks and evaluate existing tree conditions, while maintaining the existing wonderful character of Coconut Grove. A combination of solutions have been proposed and include new trees planted in conditions optimal for future growth, maintaining existing trees while improving their immediate growing environment and replacement of bricks set in a more suitable base material. The Curtis + Rogers team included landscape architects, urban arborists and horticulturists all working together to develop creative solutions to the challenging conditions. Extensive meetings were held with members of the Coconut Grove Business District, businesses in the area and the general public to seek input and ideas for the project. Cost: $ 6,000,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Curtis + Rogers Design Studio, Inc. (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Landscape Architect STANDARD FORM 330 (6/2004) PAGE 4 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Aida M. Curtis Managing Principal X X X X X X X Gerald Marston Director of Design X X X X X Jennie Rogers Landscape Architect X X X X X X Tiffany Marston Landscape Designer X X X Julio Persivale Auto Cadd / Irrigation X X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Samson Park 6 Gibson Park 2 Broward County Children’s Reading Center & Museum 7 Aventura Arts and Cultural Center 3 Broward Courthouse 8 GSA - U.S. Federal Office Building 4 Garden of the Arts Park 9 Coral Gables Tree Succession Plan 5 Flagler Streetscape 10 Coconut Grove Streetscapes Improvements E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE R. Harvey Sasso, P.E. Principal-in-Charge a. TOTAL b. WITH CURRENT FIRM 30 20 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer – FL Master of Science, Civil Engineering, Queen’s University, Kingston, Ontario, Canada, 1981 Bachelor of Science, Civil Engineering, Queen’s University, Kingston, Ontario, Canada, 1979 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) As the Principal-In-Charge, Mr. Sasso is responsible for providing overall management, direction and coordination to the engineering team for professional services related to all projects undertaken by Coastal Systems. In this capacity, he determines time schedules; allocates resources; directs joint ventures, sub-consultants and team members in performing field investigations and technical evaluations; and directs the development and evaluates the feasibility of design alternatives. Mr. Sasso has over 30 years experience as a professional coastal engineer, having worked on numerous projects in Florida, the Caribbean, and Europe. He has been involved in all aspects of coastal/marine projects, including project design, engineering analysis, environmental permitting, and the legal, political and managerial elements of project implementation. He has a reputation for providing a business approach to engineering having planned, designed and implemented numerous coastal/waterfront development projects. Mr. Sasso pioneered a regional approach to coastal sediment budget from Hillsboro Inlet in Broward County to Government Cut in Dade County. This sediment study encompassed 35 miles of shoreline, two counties, four inlets, one taxing district and ten municipalities. PROFESSIONAL AFFILIATIONS: American Society of Civil Engineers, Florida Engineering Society, Florida Shore and Beach Preservation Association, Florida Institute of Consulting Engineers 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Beachwalk, Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil/coastal engineering design and environmental permitting for the 4,000 foot on grade paver walkway that connects Lummus Park to north to 21st Street in the South Beach district of Miami Beach. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Island Gardens Mega Yacht Harbor, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Marina design and environmental permitting for 40 slip megayacht harbor on Watson Island as part of $280M site redevelopment. Hydrographic and marine resource surveys conducted and underwater bulkhead assessments provided. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Broward County Beach Restoration Project Mitigation, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2003 2003 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design/build 10 acres of artificial reef offshore of the Dania/Hollywood beaches - utilizing 66,000 tons of limerock boulders imported from Freeport, Bahamas. Project was implemented utilizing three rock barges, one crane barge, a 165-ton crane, front end loaders and two tug boats operating 24-hours/day, 7-days/week over 4 months. Marine positioning, resource surveys and hydrographic surveys were an integral part of rock placement needed to achieve a successful project. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fort Zachary Taylor State Park, Key West, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Coastal engineering design and environmental permitting for breakwaters, jetties, and beach fill project for shorelin protection at park. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Restoration, Broward County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Coastal engineering and environmental permitting for 550,000 beach fill project. Performed all beach profiles, hydrographic surveys, aerial photography, magnetometer surveys, and monitoring. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miamarina at Bayside, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1996 1997 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design and environmental permitting for 130-slip marina. Coastal engineering design including numerical modeling an physical model tests were conducted for the wave baffle design. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Peanut Island Environmental Restoration, Palm Beach County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2003 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Coastal/civil and marine structures design for 1.5-acre artificial reef habitat and 1.3 acre shallow seagrass lagoon. Additional features include a tidal pond and flushing channel, shallow-draft marina with floating docks, pedestrian boardwalks, and site utility upgrades. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rickenbacker Causeway Recreation Area, Miami-Dade County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design of shoreline stabilization and associated public recreation area improvements along 2.5-miles of shoreline of the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys completed, and coastal engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, parking improvements, stormwater management and vendor kiosks for waterfront activities. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Singer Island Sediment Transport Study, Palm Beach County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2002 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Coastal engineering analysis and numerical modeling of shoreline to evaluate shoreline recession/accretion trends relative to the hard bottom ridges. Utilized Danish Hydraulic Institute (DHI) LITPACK and MIKE 21 numerical models to simulate waves and sediment transport processes. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Village of Bal Harbour Beach Management, Bal Harbour, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Reviewed coastal processes and sediment budget at Bakers Haulover Inlet, including the Village shoreline. Evaluated bypassing alternatives, and prepared conceptual design of inlet bypassing options that could potentially reduce erosion at the Village, which is located downdrift of the Bakers Haulover Inlet. Additionally, evaluated feasibility of a bypassing operation with regards to regulatory approval and potential funding sources, including inlet tax district opportunities. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Village of Key Biscayne Beach Nourishment, FL PROFESSIONAL CONSTRUCTION (If applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Coastal engineering and environmental permitting for 120,000 cy beach fill project. Marine resource and hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and marine archeological surveys. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 32nd Street Hot Spot Breakwaters, Miami Beach, FL PROFESSIONAL CONSTRUCTION (If applicable) 2001 2002 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Coastal engineering and numerical modeling for coastal breakwaters and sand recycling project to stabilize shoreline a hot spot erosional area. Hydrographic surveys and beach profiling performed. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Penny Cutt Project Manager a. TOTAL b. WITH CURRENT FIRM 21 8 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science, Agricultural Operations Management, Specialization: Bioprocess Management, University of Florida, Gainesville, Florida, 1992 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Cutt has over 20 years of experience in the field of environmental monitoring, assessment, planning and regulatory permitting, at the local, State and Federal levels. She is able to quickly evaluate complex scientific information and communicate it to lay leaders for decision-making purposes. Ms. Cutt has a proven track record negotiating complex technical issues, particularly with regard to aquatic and coastal ecosystems, with a variety of interest groups. Ms. Cutt very effectively and equitably applies scientific, regulatory and financial judgment when evaluating complex scientific and technical information and issues. She also effectively manages workflow and product delivery, accurately identifies key issues and project needs to achieve environmentally sustainable ecosystem solutions. Ms. Cutt has extensive background in regulatory permitting having worked as a regulator for the U.S. Army Corps of Engineers, South Florida Water Management District, and Miami-Dade County Division of Environmental Resources Management. This regulatory experience facilitates the development of the permitting strategy for project implementation, as the regulatory permitting is normally on the critical path for most coastal and waterfront projects. PROFESSIONAL AFFILIATIONS: Member Broward County Marine Advisory Committee, Member Pompano Beach Marine Advisory Board, Florida Association of Environmental Professionals 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hallandale Beach Interim Beach Renourishment, Broward County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior manager overseeing the design and environmental permitting for a truck haul beach renourishment project that will temporarily stabilize the eroding shoreline. The environmental permitting for the placement of trucked in sand is nearly complete. Advise Commission on beach related issues, including mitigation of storm related effects. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Renourishment, Broward County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Project Manager providing environmental permitting, coastal engineering, funding application, and biological monitoring services for 339,151 cubic yard beach fill project and previous interim nourishment truck haul project. Manage marine and coastal surveys including marine resource investigations, pipeline corridor surveys, hardbottom mapping, Acropora sp. and in-water sea turtle surveys, and year-long shorebird monitoring. Ensure compliance with permit required monitoring and advise the Commission on all beach related issues. c. (1) TITLE AND LOCATION (City and State) Hillsboro Inlet Bypassing, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Environmental permitting for ongoing maintenance dredging and sand bypassing by the Hillsboro Inlet Maintenance and Improvement District. Evaluated marine resources including nearshore hardbottom in the exterior sand trap channel area and seagrass in the interior inlet area adjacent to the navigation channel. Processed permits through the U.S. Army Corps of Engineers, Florida Department of Environmental Protection, and Broward County Environmental Protection and Growth Management Department. Assisted the District with DEP cost-sharing of the acquisition of the new hydraulic cutterhead dredge. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hollywood Beach Management, Hollywood, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Project Manager coordinating installation of 13 biological monitoring transects and pre-construction biological survey. Biological monitoring included a hardbottom edge and emergent epifauna survey, nearshore transect data (video, sediment depth, sand/hardbottom line intercept measurements, and permanent quadrat assessments), Acropora cervicornis data (health indices and sediment depth), and artificial reef data (sediment accumulation and photographic documentation). To supplement the pre-construction dataset for the current Project, data recorded in April 2011 during the five year post-construction monitoring event on four 30 m transects monitored for the Broward County Segment III Shore Protection Project was also analyzed. Managing post construction compliance efforts including hardbottom and epifaunal edge surveys and regulatory permit compliance. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Kennedy Park Shoreline Stabilization, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design and environmental permitting for a shoreline stabilization and enhancement project. Conducted detailed mangrove and upland vegetation and topographic surveys to determine areas in need of enhancement and placement of view corridors. Improving shoreline at existing passive use park to include exotic removal, stabilizing shoreline with native vegetation and properly permitted natural shoreline stabilization and creation of public view corridors through key locations within densely vegetated mangrove fringe. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rickenbacker Causeway Recreational Area, Miami-Dade County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Permitting of shoreline stabilization and associated public recreation area improvements along 2.5 miles of shoreline of the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys completed and coastal engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, parking improvements, stormwater management and vendor kiosks for waterfront activities. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Reach 8/South End Restoration, Palm Beach County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Project Manager directing and reviewing feasibility study, Equilibrium Toe of Fill Assessment, Mitigation Design, and modeling to support application processing for proposed beach nourishment project for the south end of the Town. Engineering assessment to evaluate sediment coming into project area from updrift beach renourishment and corresponding adjustment to project construction template. Further adjustments to template to accommodate requests from NGOs to secure support for project. Evaluated beach management, environmental permitting options and processing environmental permits to authorize beach project. h. (1) TITLE AND LOCATION (City and State) Village of Bal Harbour Beach Management, Bal Harbour, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Reviewed coastal processes and sediment budget at Bakers Haulover Inlet, including the Village shoreline. Evaluated bypassing alternatives, and prepared conceptual design of inlet bypassing options that could potentially reduce erosion at the Village, which is located downdrift of the Bakers Haulover Inlet. Additionally, evaluated feasibility of a bypassing operation with regards to regulatory approval and potential funding sources, including inlet tax district opportunities. Prepared Joint Coastal Permit applications and advise the Village Council on shoreline processes and management. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Village of Key Biscayne Beach Renourishment, Miami-Dade County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Project manager providing strategic beach management consulting services to Village. Designed and permitted 37,485 cubic yard truck haul beach renourishment project, to include authorization for maintenance renourishment events. Managed development, pre-construction survey, and oversee post construction seagrass surveys to ensure no impacts from beach equilibration. The project was designed to avoid direct impacts to nearshore seagrasses and avoid mitigation requirements. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Jordon Cheifet, P.E., C.F.M. Coastal Engineer a. TOTAL b. WITH CURRENT FIRM 10 4 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Master of Science, Ocean and Resources Engineering, University of Hawaii, 2005 Bachelor of Science, Civil Engineering, Pennsylvania State University, 2002 Professional Engineer – AL, FL Certified Floodplain Manager 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Cheifet is a coastal engineer with more than 10 years of diverse, professional experience. His wide-ranging expertise includes FEMA coastal floodplain mapping, shore protection structure design, numerical modeling, feasibility studies, and dredging projects. He is capable in multiple numerical modeling techniques and is well-versed in the latest coastal design manuals such as the CEM and SPM. Mr. Cheifet has extensive topographic and bathymetric survey experience where he has utilized RTK GPS, total stations, and echo sounders for topographic and beach profile surveys. His field experience includes above and underwater inspections, GIS/GPS data collection, surveying, and construction oversight. Mr. Cheifet also has extensive knowledge of GIS applications to coastal engineering and has leveraged this technology through desktop, server, and mobile platforms on multiple projects including coastal flooding, wetland restoration, dredging, and offshore wind farm siting. Mr. Cheifet completes most of his design and construction work using a variety of coastal and civil design software that includes MIKE21-SW, MIKE21-FM, STWAVE, CHAMP, ACES, ArcGIS, AutoCAD, and HYPACK. PROFESSIONAL AFFILIATIONS: American Society of Floodplain Managers, Florida Floodplain Managers Association 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 40-50 Blossom Way Due Diligence, Town of Palm Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Coastal Systems provided coastal engineering consulting services to a private client as part of a due diligence assessment for an oceanfront property acquisition in the Town of Palm Beach. Services included site inspection of coastal structures, assessment of beach erosion issues, interpretation of Town, County, and State beach nourishment data to assess short- and long-term erosion and beach stability trends. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City-Wide Dock Maintenance, West Palm Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Above- and underwater investigation of 2 existing fishing piers to evaluate conditions. Issued engineering report summarizing the assessment and provided recommendations and cost estimates for potential structural rehabilitation. Structural design of new fishing pier at El Cid dock resulting from investigation findings. Construction administration services provided. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Currie Park Staging Docks, West Palm Beach FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design of 2 public staging docks and dredging design of 2 new access channels to improve public access at an existing boat ramp. Project management of environmental permits, which included a marine resource assessment and installation of 15 Uniform Waterway Markers to increase the navigational safety of vessels travelling between the Intracoastal Waterway (ICW) and Currie Park. d. (1) TITLE AND LOCATION (City and State) Hillsboro/Deerfield Beach Restoration, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Environmental permitting, coastal engineering, funding applications and biological monitoring for 339,151 cubic yard beach fill project. Conducting marine and coastal surveys including marine resource investigations, pipeline corridor surveys, hardbottom mapping, Acropora sp. and in-water sea turtle surveys, and year-long shorebird monitoring. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Manatee Bend Shoreline Stabilization and Kayak Launch, Miami- Dade County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design of shoreline stabilization to preserve existing, dilapidated, historical coral rock seawall and steps to access water to include new seawall landward of existing and limestone boulder riprap. Design of kayak launch within existing park setting to allow passive recreation and launch of non-motorized vessels to increase use of City Park. Environmental permitting of proposed structures through County, State, and federal environmental regulatory agencies and coordinate with City for municipal building permit. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Reach 8 DEIS Review, Palm Beach County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Provided comments on the DEIS to be addressed in the Final Environmental Impact Statement (FEIS) to ensure that the final document represents a comprehensive technical assessment of the proposed Southern Palm Beach Island Comprehensive Shoreline Stabilization Project that is sufficient to facilitate efficient federal permitting of a shoreline stabilization project to mitigate the erosion in the southern end of the Town’s beach and that fully addresses all NEPA requirements. Detailed technical comments were provided, which are anticipated to be addressed in the Final Environmental Impact Statement. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Reach 8/South End Beach Nourishment, Palm Beach County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Feasibility study, Equilibrium Toe of Fill Assessment, Mitigation Design, and modeling to support application processing for proposed beach nourishment project for the south end of the Town. Engineering assessment to evaluate sediment coming into project area from updrift beach renourishment and corresponding adjustment to project construction template. Further adjustments to template to accommodate requests from NGOs to secure support for project. Evaluated beach management, environmental permitting and funding options and processing environmental permits to authorize beach project. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sunny Isles Beach Breakwater Investigation, Sunny Isles Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Conducted an underwater investigation of submerged breakwaters located offshore of the City of Sunny Isles Beach. Provided a structural assessment to evaluate the condition of the existing breakwaters and summarized findings in an Engineering Assessment Report. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sunny Isles Beach Coastal Structures Feasibility Study – Phase II, Sunny Isles Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Prepared an updated summary of coastal structures feasibility, as an addendum to a Phase I Shoreline Stabilization Study to revise the recommendations based on beach management projects either completed or planned in the Tri-County area since 2009 for the City of Sunny Isles Beach. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Orestes Betancourt Civil Designer a. TOTAL b. WITH CURRENT FIRM 35 25 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International – Coral Gables, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Arts, Construction Management, Florida International University 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Betancourt has over 30 years of experience in site/civil engineering and has completed projects for a variety of sites including hotels, condominiums, marinas, resorts, industrial/commercial areas, and parks. He regularly coordinates with project consultants including architects, engineers and mechanical/electrical/plumbing (MEP) to ensure consistent site/civil design with project requirements. Mr. Betancourt provides design and construction administration services associated with site civil and utility projects undertaken by Coastal Systems. He has provided civil design, construction inspections, field surveys and planning layouts for numerous site/civil and permitting projects throughout South Florida and the Caribbean. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 10th Street Auditorium – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Civil design and environmental permitting for the City of Miami Beach's 10th Street Auditorium and Beach Patrol Headquarters. The $6.25M design included restoration of the two buildings to include new water and sewer service, as well as connections to the adjacent public restrooms. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bayfront Street Ends Improvements – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2015 (Est.) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Bulkhead design and environmental permitting for street ends at South Shore Drive, 10th Street, 14th Street, Lincoln Road as well as Island View Park. Streetscape design for street ends at South Shore Drive, 10th Street and Lincoln Road to improve upland access to the waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements. Construction costs totaled to $700,000. c. (1) TITLE AND LOCATION (City and State) Beachwalk – Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Civil/coastal engineering design and environmental permitting for the $3M 4,000 foot on grade paver walkway that connects Lummus Park north to 21st Street in the South Beach district of Miami Beach, along with associated amenities and landscaping. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Capri Streetscape – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Paving, grading and drainage design for 3 residential complexes with a total 72 units and an underground parking garage next to Biscayne Bay, covering two city blocks. $600,000 design included water main extensions for each street, fire, sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump stations. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Beach Recreational Corridor (NBRC) – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Site/Civil engineering services include paving and grading for 6,700 linear feet of a $6M multi- purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes dune enhancements, landscaping, electrical and water service for irrigation. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pinetree Park – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Shoreline, marine resource and hydrographic surveys along park waterfront. Feasibility and preliminary design of canal and public water access structures. Construction costs totaled to $155,000. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Setai Development – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2005 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Paving, grading, and drainage designs for a new residential condominium tower with 195 units as well as hotel renovations. Design included water, fire and sanitary services as well as a drop-off lane on Collins Avenue and 20th and 21st Street end improvements. Construction costs totaled to $150,000. h. (1) TITLE AND LOCATION (City and State) Soundscape Park – Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Provided site/civil engineering services as part of the design team led by the architectural firm, West 8. Coastal Systems completed the stormwater management design for the site, and processed the Class II permit through the Miami-Dade County Department of Environmental Resource Management (DERM). In addition, water and sanitary sewer services were designed for the site. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South of Fifth – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Development of four condominium buildings ($38M) on top of a garage pedestal with an on- grade pool deck area and dune restoration project. Provided coastal permitting and engineering services that included permits from the Florida Department of Environmental Protection (DEP) and marine turtle lighting review through the Florida Fish and Wildlife Conservation Commission (FWC). Also provided Florida Building Code, City Code (FBC), and Federal Emergency Management Agency (FEMA) flood compliance reviews. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Pointe Park – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Civil Designer, Civil design and coastal/environmental permitting of a$22.4M multi-purpose recreational park area for structural, hardscape, and landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with offices/concession/restrooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Andres Perez, P.E. Engineering Department Head a. TOTAL b. WITH CURRENT FIRM 17 16 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International – Coral Gables, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer – FL Bachelor of Science, Civil Engineering, Florida International University 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Perez has over 17 years of civil engineering experience in Florida. He has completed the planning, design and construction administration for site/civil projects including parks, streetscape, and Right-of-Way. He has also completed designs for private site developments such as hotels, condominiums, parking lots/garages, commercial properties and dry stack marinas. These projects have required the design of stormwater management systems consisting of retention areas, drainage wells, exfiltration trenches, and outfalls. These projects have also required the design of water and sanitary sewer services. His site/civil design experience in Florida includes the permitting of projects through agencies such as the Florida Department of Environmental Protection (DEP), South Florida Water Management District, and Florida Department of Transportation. He has processed stormwater management designs through these agencies to obtain Environmental Resource Permits (ERP), and he has demonstrated experience with projects adjacent to the coast and/or waterfront. These projects have required extensive coordination with diverse project teams to design projects that meet the development programming goals for both public and private sector clients, but that also meet the stringent regulatory permitting criteria to manage surface water runoff. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Beachwalk – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager, Civil/coastal engineering design and environmental permitting for the $3M 4,000 foot on grade paver walkway that connects Lummus Park north to 21st Street in the South Beach district of Miami Beach, along with associated amenities and landscaping. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Beachwalk II – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager, Civil/coastal engineering design and environmental permitting for the $4M 2,300 feet on grade paver walkway that connects South Pointe Park, Marjory Stoneman Douglas Park, and Lummus Park in the South Beach district of Miami Beach. c. (1) TITLE AND LOCATION (City and State) Bluepoints Marina, Port Canaveral, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Marina design and environmental permitting for a 10-acre dry storage marina facility, including 940 dry slips, 10 wet slips, and 33 launching/holding slips. Hydrographic and marine resource surveys conducted. Civil engineering services also provided. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Casa Del Mar Yacht Club, Boynton Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design and permitting of 4.1 acre site for 320 dry stack marina project. Design of docks, bulkheads and dredging for 35 wet slips. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Haulover Marine Center, North Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Marine and site/civil improvements for the redevelopment of a new marina facility with approximately 400 feet of bulkhead. Surveying, water and sanitary sewer design, utility coordination, and construction administration services provided. Redesigned sheet pile bulkhead with augercastpile-supported reinforced concrete forklift launching platform. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Island Gardens Mega Yacht Harbour, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Marina design and environmental permitting for 50-slip megayacht harbor on Watson Island as part of $600M site redevelopment. Hydrographic and marine resource surveys and underwater bulkhead assessments provided. Design of dredging, mitigation, fixed piers, and utilities for vessels up to 450 feet long. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Kennedy Park Shoreline Stabilization, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Design and environmental permitting for a shoreline stabilization and enhancement project. Conducted detailed mangrove and upland vegetation and topographic surveys to determine areas in need of enhancement and placement of view corridors. Improving shoreline at existing passive use park to include exotic removal, stabilizing shoreline with native vegetation and properly permitted natural shoreline stabilization and creation of public view corridors through key locations within densely vegetated mangrove fringe. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Beach Recreational Corridor (NBRC) – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager, Site/Civil engineering services include paving and grading for 6,700 LF of a $6M multi-purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes dune enhancements, landscaping, electrical and water service for irrigation. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pinetree Park – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager, Shoreline, marine resource and hydrographic surveys along park waterfront. Feasibility and preliminary design of canal and public water access structures. Concepts were prepared for the City to review that included lagoons, mangrove planters and kayak launching areas. Designed the kayak launching area with a unique vinyl bulkhead system that incorporates an architectural fascia. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rickenbacker Causeway Recreational Corridor – Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Civil Engineer, Design of shoreline stabilization and associated public recreation area improvements along 2.5 miles of shoreline of the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys completed, and coastal engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, parking improvements, stormwater management and vendor kiosks for waterfront activities. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Jade Signature Beach Nourishment Sunny Isles Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) 2014 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Sunny Isles Beach Associates, LLC 1300 Brickell Avenue Miami, Florida 33131 b. POINT OF CONTACT NAME Mr. Ron Choron c. POINT OF CONTACT TELEPHONE NUMBER (305) 351-1000 rlchoron@fortune-network.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems provided beach profile surveying services relative to the Florida Department of Environmental Protection (FDEP) Coastal Construction Control Line (CCCL) permit compliance for the Jade Signature (Project) development located at 16901 Collins Avenue in Sunny Isles Beach. Pre-construction beach profile surveys and mapping for 5,000 linear feet of shoreline were conducted prior to the implementation of the proposed truck haul beach nourishment for the Project area. Coastal Systems completed the coastal engineering design of the 35,835 cubic yards (cy) beach fill project. A phased-approach was proposed for the implementation of the Project by utilizing the 17,820 cy of sand stockpiled from the excavation. The remainder of the beach fill Project was completed with the approved County source of sand from the Ortona Mine. Additionally, Coastal Systems provided consulting services relative to the construction of the project, including construction plans, bid assistance, construction administration, construction surveying, volume calculations, and turbidity monitoring. The firm also provided Resident Project Representative (RPR) services. Upon completion of construction, Coastal Systems performed post-construction beach profile surveying and mapping. A physical monitoring engineering report was prepared, providing pre/post construction beach profile data and baseline conditions. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International (2) FIRM LOCATION Coral Gables, FL (3) ROLE Environmental Permitting, Coastal Engineering STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Beachwalk II, Miami Beach, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) 2014 (Phase 1) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Beach Division of Environmental Resource Management 1700 Convention Center Drive Miami Beach, Florida 33139 b. POINT OF CONTACT NAME Ms. Elizabeth Wheaton c. POINT OF CONTACT TELEPHONE NUMBER (305) 673-7080 x 6121 ElizabethWheaton@miamibeachfl.go v 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) A continuation of the City’s original Beachwalk project, the Beachwalk II is planned to connect Lummus Park to the pedestrian path at the Continuum properties, south of South Pointe Drive. The path encompasses 5 blocks, connecting 3 vital parks within the City’s South of Fifth neighborhood. The $4M Beachwalk path will serve to energize the coastal development within the South of Fifth area while also formalizing the existing hardpack area between 5th Street and South Pointe Drive by encompassing: • Three (3) open-space parks (Lummus, Marjory Stoneman Douglas, and South Pointe) • The South of Fifth neighborhood • Coastal dune improvements and controlled beach access points Coastal Systems is responsible for the planning, design, and regulatory permitting for the project, along with AECOM, a landscape architecture and urban planning sub-consultant. Preliminary designs were completed with renderings for public meetings. The project has been phased to account for adjacent property owners in the northern section of the project. Construction of Phase 1 was completed in October of 2014, and CCCL permitting for Phase 2 is progressing. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International (2) FIRM LOCATION Coral Gables, FL (3) ROLE Coastal Permitting Civil Engineering STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Kennedy Park Shoreline Stabilization, Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2012 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami 444 SW 2nd Ave. 8th Floor Miami, FL 33130 b. POINT OF CONTACT NAME Mr. Carlos A. Vasquez c. POINT OF CONTACT TELEPHONE NUMBER (305) 416-1206 cavasquez@miamigov.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems evaluated 4.12 acres of shoreline within Kennedy Park fronting Biscayne Bay. The shoreline restoration includes an upland restoration area of 1,640 linear feet to include removal of debris, exotic, invasive plant species and re-planting of select areas with native species and accumulated sediments. Additionally, Coastal Systems evaluated grades within the Project area to improve water access, stabilize the shoreline, and/or to enhance mangrove planter areas to protect the shoreline against erosion. Environmental permits from the U.S. Army Corps of Engineers, Florida Department of Environmental Protection, and Miami-Dade County PERA were obtained in 2012, and Coastal Systems is assisting the City of Miami with grant processing for funding through the Florida Inland Navigation District (FIND) for construction. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International (2) FIRM LOCATION Coral Gables, FL (3) ROLE Environmental Permitting, Coastal Engineering STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Rickenbacker Causeway Recreational Area, Miami-Dade County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2011 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade County Public Works Department 111 N.W. First Street, Suite 1510 Miami, FL 33128-1970 b. POINT OF CONTACT NAME Ms. Svetlana Moorey, P.E. c. POINT OF CONTACT TELEPHONE NUMBER (305) 375-2863 lana@miamidade.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Rickenbacker Causeway connects Key Biscayne to downtown Miami, crossing historic Virginia Key and the artificial Hobie Island. The Causeway serves as an important transportation corridor, but also has approximately 2.5- miles of recreational shoreline. These popular beaches are favorites for swimming and water sports including kayaking, kite boarding, sailing and wind surfing. Coastal engineering analyses were completed to determine winds, waves and sediment transport along the Project shoreline. Designs were developed for shoreline stabilization including rock revetment, mangrove planter and beach nourishment stabilization. The beach nourishment was designed to avoid impacts to sensitive seagrass beds immediately adjacent to the Project shoreline. Sand sources were evaluated based on geotechnical analyses to determine the most economical and compatible beach fill. The beach restoration project includes upland paving and grading as well as stormwater management improvements. Field investigations were completed including hydrographic surveying and beach profiling. Marine resource (seagrass) surveys were conducted, as well as upland native and exotic vegetation mapping. The field data was utilized to design a beach restoration project that included upland paving and grading as well as stormwater management improvements. The $6M project combined an extensive upland exotic vegetation removal effort with replanting of native salt-tolerant species. In addition, mangrove planters were designed to enhance the shoreline and protect existing mangrove vegetation. Environmental regulatory permits for the project were processed through Miami-Dade Division of Environmental Resources Management (DERM), the Florida Department of Environmental Protection (DEP) and the U.S. Army Corps of Engineers (Corps). Coastal Systems prepared construction plans and specifications in conjunction with funding constraints and prioritized project elements established by the County. Construction was completed in 2010. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International (2) FIRM LOCATION Coral Gables, FL (3) ROLE Environmental Permitting, Coastal Engineering, Hydrographic Surveying, Civil Engineering STANDARD FORM 330 (1/2004) PAGE 3 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Lisa H. Hammer 13. ROLE IN THIS CONTRACT Horticultural & Arboricultural Consulting 14. YEARS EXPERIENCE a. TOTAL 35 b. WITH CURRENT FIRM 29 15. FIRM NAME AND LOCATION (City and State) Lisa H. Hammer, RCA, Horticultural Consultant, Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) BS Agriculture, Major in Fruit Crops Specialization in Tropical Agriculture MS Biology, Pollination Ecology 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida Dept of Ag & Consumer Svcs. Certified Pest Control Operator 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Registered Consulting Arborist #333 (Am. Soc. Consulting Arborists); Certified Arborist #SO-0758 (Intn’l Soc. Arbor) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City of Coral Gables, Florida Tree Succession Program (2) YEAR COMPLETED In Progress PROFESSIONAL SERVICES Consulting Arborist CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Evaluation of all (38,000) residential street trees; short- and long-term plans for street tree replacements and re-planting b. (1) TITLE AND LOCATION (City and State) City of Miami, Coconut Grove Business Improvement District (2) YEAR COMPLETED in progress PROFESSIONAL SERVICES Consulting Arborist CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Streetscape improvement program. Evaluation of all existing trees, recommendations for disposition, remedial Treatment, re-planting. New sidewalk construction with silva cell installation. c. (1) TITLE AND LOCATION (City and State) City of Hollywood, Hollywood Boulevard Renovation (2) YEAR COMPLETED in progress PROFESSIONAL SERVICES Consulting Arborist N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Tree Risk Assessment of 25 existing trees. d. (1) TITLE AND LOCATION (City and State) Museum Park, City of Miami (2) YEAR COMPLETED 2009 PROFESSIONAL SERVICES Horticultural Consultant CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Review landscape architectural plans and advise on species selection. Development of Landscape Maintenance Specifications. (1) TITLE AND LOCATION (City and State) Village of Key Biscayne, Florida (2) YEAR COMPLETED 2011 PROFESSIONAL SERVICES Horticultural Consulting CONSTRUCTION (if applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Evaluation of existing landscape conditions. Development of Landscape Maintenance Specifications. STANDARD FORM 330 (1/2004) PAGE 2 H. ADDITIONAL INFORMATION ________________________________________________________________________________________________________ 29. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED: Lisa H. Hammer has over 35 years of experience in all aspects of South Florida and Tropical Horticulture. She has served on the Board of Directors of recognized institutions such as the International Society of Arboriculture – Florida Chapter, the Florida Arborist Association, and the Florida State Horticultural Society, and several advisory committees of the American Society of Consulting Arborists (plant appraisal, editorial review, tree risk assessment). Ms. Hammer is one of the most respectable Horticultural Consultants, known for her accurate un-biased assessment of trees and palms. In addition to her horticultural background, she is a Registered Consulting Arborist (American Society of Consulting Arborists), Certified Arborist (International Society of Arboriculture), Qualified Tree Risk Assessor (ISA) and a State of Florida Certified Pest Control Operator. She has worked in developing specifications and manuals for new plantings, renovations of dated plantings, relocations and GREEN sustainable practices. She has worked for various municipalities in South Florida including City of Miami, City of Miami Beach, City of Coral Gables, Miami-Dade County Parks, and Miami-Dade County Schools among others. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE: 05/09/2016 33. NAME AND TITLE OF SIGNER: Lisa H. Hammer STANDARD FORM 330 (6/2004) PAGE 6 STANDARD FORM 330 (6/2004) PAGE 6 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) RFQ # 16-04-02 PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Lisa Hammer 3. YEAR ESTABLISHED 1987 4. DUNS NUMBER N/A 2b. STREET PO Box 330203 5. OWNERSHIP a. TYPE 2c.CITY Miami 2d. STATE FL 2e. ZIP CODE 33233 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Lisa Hammer 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER 305-858-4667 6c. E-MAIL ADDRESS lisahhammer@bellsouth.net 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH N/A Sole Practitioner Total 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 0 b. Non-Federal Work 1 c. Total Work 1 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 05/09/2016 c. NAME AND TITLE Lisa Hammer CURTIS + ROGERS DESIGN STUDIO, INC 02 02 . 4 | C u r r e n t S c h e d u l e o f F e e s Current Schedule of Fees Curtis + Rogers Design Studio LOADED BILLING RATES Firm’s Name: Curtis & Rogers Design Studio, Inc. LOADED BILLING RATES-2016 Job Class Unit Loaded Rates Principal/ Senior Landscape Architect Hour $180.00 Project Landscape Architect Hour $135.00 Landscape Arch (Registered) Hour $95.00 Landscape Arch (Non-Registered) Hour $85.00 Landscape Arch Tech Hour $75.00 I hereby certify that the above fees are the current Curtis & Rogers Design Studio, Inc.’s fees for landscape architecture services whether performed for private or governmental clients. Date: January 20,2016 (Your signature) Aida M. Curtis President (Position) CURTIS + ROGERS DESIGN STUDIO, INC 02 02 . 5 | M / W B E C e r t i f i c a t i o n Minority/Women (M/WBE) Certification Curtis + Rogers Design Studio Curtis + Rogers Design Studio, 09/22/2015 09/22/2017 CURTIS + ROGERS DESIGN STUDIO, INC [ attachments ] 03 03 | Attachments 1. Addenda Acknowledgment Form 2. Non-Collusion Affidavit 3. Public Entity Crimes 4. Equal Opportunity/Affirmative Action Statement 5. Conflict of Interest Statement 6. Dispute Disclosure Form 7. Anti-Kickback Affidavit