Loading...
HomeMy WebLinkAboutDegrove Surveyors, Inc.       Statement of Qualifications  for  Shoreline Surveying and Mapping  Consulting Services  RFQ #16­06­01              Submitted to:      Submitted by:  2131 Corporate Square Blvd.  Jacksonville, Florida 32216  (904) 722‐0400 Phone  •  (904) 722‐0402 Fax  www.degrove.com  degrove@degrove.com        605 N.W. 53rd AVENUE  Suite A11a GAINESVILLE, FLORIDA 32609 (352) 338-9667  FAX (352) 338-9677 2131 CORPORATE SQUARE BLVD. JACKSONVILLE, FLORIDA 32216 (904) 722 0400  FAX (904) 722 0402 DEGROVE@DEGROVE.COM 13         June 24, 2016    City Clerk  Sunny Isles beach Government Center  18075 Collins Avenue  Sunny Isles Beach, Florida 33160    Reference: RFQ #16‐06‐01 Shoreline Surveying and Mapping Consulting Services    To Whom It May Concern,    Degrove Surveyors, Inc. wishes to make its sincere interest known in serving the City on this  important project.    Degrove Surveyors, Inc., through this submittal, commits all necessary resources to serve the  City.  We are willing to assist the City in meeting its goals through providing professional  surveying and mapping services that meet the time and budget requirements set forth by the  City.    Through our experience on projects exactly like this one, we have a thorough understanding of  the work that may be required.       Degrove President, Gordon (Ray) Niles will serve as the Contract and Project.  He is authorized  to make representations for the firm:    Gordon R. Niles, PSM, President  2131 Corporate Square Blvd  Jacksonville, Florida 32216  (904) 722‐0400  niles@degrove.com        Thank you for your consideration and we look forward to working with you.    Sincerely,      Gordon R. Niles, PSM, CH  President  Table of Contents A. Cover Page B. Minimum Requirements 1. Introduction 2. Licenses and Certificates C. Specific Project Experience D. Approach/Methodology E. Qualifications of the Project Team F. Current Client List / References G. Attachments 1. Examples of Project Deliverables 2. Addenda Acknowledgement Form 3. Non-Collusion Affidavit 4. Public Entity Crimes 5. Equal Opportunity / Affirmative Action Statement 6. Conflict of interest Statement 7. Dispute Disclosure Form 8. Anti-Kickback Affidavit 9. Certificates of Insurance 10. Certificate of Status City of Sunny Isles Beach |Request for Qualifications No. 16-06-01 16 COVER PAGE Legal Name of Firm ______________________________________________________________________ DBA, if any _____________________________________________________________________________ FEIN ___________________________________ Mailing Address _________________________________________________________________________ City, State, Zip Code _____________________________________________________________________ Contact Name _______________________________________________________ Title _______________________________________________________________ Contact Email Address ________________________________________________ Contact Telephone Number ____________________________________________ 1. I hereby certify that I am authorized to act on behalf of the Firm and that all statements made in this document are true and correct to the best of my knowledge. 2. By submitting a response, the Firm certifies that the Firm has fully read and understands the RFQ. 3. Firm understands and agrees to be bound by the conditions in the RFQ and shall conform to all the requirements. 4. Firm proposes and agrees, if awarded a contract, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish consulting services. Authorized Signature _________________________________________________ Print Name _________________________________________________________ Title _______________________________________________________________ Date ______________________________________________________________ B.1 Introduction   Founded in 1971, Degrove Surveyors, Inc. has established itself as a leader in the surveying and mapping  profession.  A Jacksonville‐based small business, Degrove has worked extensively throughout the state  of Florida, as well as many other locations throughout the southeastern United States.  We serve a  diverse group of repeat public and private‐sector clients, including the Jacksonville District of the U.S.  Army Corps of Engineers, many of the Water Management District, Florida Department of  Environmental Protection, U.S. Forest Service and many other public and private entities.  Through  many years of service to public/government clients, Degrove has gained a reputation of consistently  delivering reliable survey information within specified timelines – no matter the size, complexity, or  unique challenges of the project.      Currently serving in our third consecutive surveying contract with the Jacksonville District of the Corps of  Engineers.  As part of this contract we have completed 27 separate beach monitoring and construction  support surveys exactly the same or very similar to the project covered by this solicitation. Degrove  maintains a superior combination of expert professional and technical personnel, state‐of‐the‐art survey  equipment, and specialized experience – all making our firm highly qualified and well prepared to serve  City of Sunny Isles Beach.  We possess the necessary specialty vehicles and vessels to navigate and  survey in the environment that will be encountered for this project.      Our team is led by four Florida‐licensed professional surveyor and mappers who possess over 100 years  of combined experience.  These surveyors offer the District a diverse level of expertise that is rarely  found in a single survey firm. While headquartered in Florida, Degrove is also licensed to practice  surveying and mapping throughout the southeastern coastal United States, including Florida, Georgia,  Alabama, Mississippi, North Carolina, South Carolina, and Louisiana.      With in‐house capabilities and expertise in surveying, mapping, hydrographic surveying, subsurface  utility location, and CADD/GIS,     Team Organization    As demonstrated in this statement of qualifications, Degrove Surveyors, Inc. is the prime respondent in  this submittal, and will provide all of the necessary services.  Degrove President, Gordon R. Niles, P.S.M.,  C.H., will serve as the Project Manager and will be the City’s daily source of contact for the life of the  contract.      Project Management – Lines of Responsibility and Methodology     In the role of Project Manager, Degrove President Gordon R. Niles will review in detail all Statements of  Work (SOW) that Degrove receives from the City and prepare a proposal.  Upon being issued a Task  Order, he will assume all responsibility for the completion or delegation of all aspects of the project  (research, planning, adherence to timelines, allocation of resources, management of field crews, daily  progress reviews and performance of the hydrographic survey).  Further, it becomes his responsibility to  ensure that Degrove’s protocol for project management methodology is adhered to.      B.1 Introduction Degrove’s project management methodologies consist of five process groups and a control system.  The  process groups include:     1. Initiation  2. Planning  3. Execution  4. Monitoring and Controlling  5. Closing    1. Initiation  The initiation process determines the nature and scope of the project.  The key project controls needed  are an understanding of project scope and making sure all necessary controls are incorporated into the  project. Issues to be resolved at this stage include the following:   Scope and deliverables    Objectives    Resources needed    Milestone plan and timeline   2. Planning  The planning process begins with the Project Manager appointing the specific project team and then  delegating specific duties to each team member based on their unique skills, specialized expertise, and  current workload.  The Project Manager works with the project team to plan the execution stage.  The  planning stage includes the research of pertinent information, as well as the determination of field  methods and the identification of potential project obstacles including things such as property access  and inhospitable terrain.  This stage allows for appropriate steps to be taken preemptively to avoid  unexpected project setbacks (i.e. making sure all equipment is in good working order, contacting the  proper authorities to arrange for safe and legal access to the beach, etc.).  3. Execution  Execution consists of the processes used to complete the work defined in the project management plan,  to accomplish the project's objectives. The execution process involves coordinating people and  resources, as well as integrating and performing the activities of the project.  4. Monitoring and Controlling  The monitoring and controlling process group involves managing and tracking the project, so potential  problems can be identified quickly and corrective action can be taken.  Monitoring and controlling  includes:   Measuring the ongoing project activities (where are we, against where we should be?)    Monitoring the project variables (cost, effort, scope) against the project management plan and  the project baseline (where should we be?)    Identifying corrective actions to address risks and issues (how can we get back on track?)   B.1 Introduction  Managing changes and unforeseen challenges (what is the impact of this change or challenge?)    The monitoring and controlling process group ends once the project has achieved its goals and  objectives as detailed in the scope of services.    The status of all projects will be reported to the Corps on a weekly basis.  5. Closing  Closing a project means finishing all activities across all process groups and signing off the project with  the City.  At this point it is important to know how well the project has performed. The Project Manager  completes a project closure evaluation and communicates how well the project was performed against  its original business case, quality measures, cost, duration and tolerances.  Observations are used to aid  in the planning, execution, and monitoring of future projects.    Quality Control / Quality Assurance Procedures    Degrove performs project controls and quality assurance/quality control (QA/QC) at multiple levels as  part of the natural progress of work.  Degrove puts in place QA/QC procedures that are tailored to fit  each specific project and are identified and documented as part of the project scope and the project  plan.  While the specific details of these plans vary with each project, Degrove does maintain overall  QA/QC procedures, which are described in this section.  1. Project Team Kickoff Meetings  Degrove takes the stance that the best QA/QC procedures begin prior to the commencement of any  project work being completed.  Upon appointing the project team, the Project Manager holds  meeting(s) with all involved team members.  Through these meeting(s), the Project Manager reviews  the project‐specific scope, timeline, approach and methods, and individual duties of team members.   The Project Manager also listens to other team members’ ideas and suggestions, and ensures each team  member attains a full and proper understanding of the project goals, procedures, and his/her  responsibilities within the project team.  2. Field QA/QC Checks and Procedures  Each field crew is given clear instructions as to project‐specific methods for achieving the required  survey data.  It is the responsibility of the Project Manager to ensure that these procedures are followed  and documented by the Field Crew Chief.  Any unique challenges or situations in the field are  immediately communicated by the Field Crew Chief to the Project Manager who will ensure that the  proper adjustments are made and that if necessary the District is informed.  It is also the responsibility  of the Project Manager to ensure that the Field Crew Chief achieves the following QA/QC procedures  and checks while in the field:    Perform all necessary equipment calibrations.  B. Minimum Requirement 2. Licenses and Certificates Professional Surveyor and Mapper Licenses B. Minimum Requirement B. Minimum Requirement Certificate (Certified Hydrographer) C. Specific Project Experience The following projects show that Degrove has 11 years of experience in providing services in accordance with the Florida Department of Environmental Protection (DEP) “Monitoring Standards for Beach Erosion Control Projects”. Project Name: Survey #13-068 Topographic and Hydrographic Survey, Bal Harbour, Miami-Dade County Client: U.S. Army Corps of Engineers Client Contact: Robert Swilley, PSM 904 232-1704 Robert.W.Swilley@usace.army.mil Cost: $18,223.28 Period: 5//2013 - 6/2013 In preparation for planned beach nourishment we were  tasked with completing 11 beach profiles, 4 nearshore  profiles and an offshore borrow area which was just north of  Baker’s Haulover Inlet. The beach profile lines began at R‐27  at the inlet and ran south to R‐33 and included intermediate  lines. Beach profile lines began approximately 150 feet landward when possible of the published or  physical location of the Coastal Construction Control Line (CCCL) monument and extending easterly  approximately 3000 feet into the Atlantic Ocean. We utilized RTK GPS, A Motion Reference Unit  (MRU) to adjust for heave pitch and roll and Hypack hydrographic data collection and processing  software to complete the hydrographic survey.  Due to the time constraints place upon us we  utilized two boats and associated equipment. The open boat was used for the surf zone while the  26’ Enclosed cabin boat was used offshore. The uplands were surveyed using a combination of RTK  GPS and robotic total station.   Project Name: Survey #13-073 Broward County Topographic and Hydrographic Survey Cost – Period $33,824.52 - 5/2013-7/2013 Client: U.S. Army Corps of Engineers Client Contacts: Robert Swilley, PSM 904 232-1704 Robert.W.Swilley@usace.army.mil Broward County SPP Monitoring Surveys – Broward County, Florida – After beach nourishment had  been completed we were tasked with completing  a topographic/hydrographic profiles survey  meeting the requirements of the Florida Department of Environmental Protection (DEP)  “Monitoring Standards for Beach Erosion Control Projects”. The survey included of 62 lines,  beginning approximately 150 feet landward of the published or physical location of the Coastal  Construction Control Line (CCCL) monument and extending easterly approximately 3000 feet into  the Atlantic Ocean. We utilized RTK GPS, A Motion Reference Unit (MRU) to adjust for heave pitch  and roll and Hypack hydrographic data collection and processing software to complete the  Transiting Baker’s Haulover Inlet C. Specific Project Experience Image of seabed in borrow area. Sand and shells are visible. hydrographic survey. The uplands were surveyed using a combination of RTK GPS and robotic total  station.   Project Name:   Survey #13­077 Lee County Topographic and Hydrographic Survey   Cost – Period $28,199.07 - 6/2013-7/2013 Client: U.S. Army Corps of Engineers Client Contacts: Robert Swilley, PSM 904 232-1704 Robert.W.Swilley@usace.army.mil Degrove was tasked with providing a topographic and hydrographic survey of beach profiles  meeting the requirements of the Florida Department of Environmental Protection (DEP)  “Monitoring Standards for Beach Erosion Control Projects” and surveying an offshore borrow area.   Additionally digital photographs and video was taken of the seafloor within the borrow area. This  project required a quick turnaround.  It was delivered 21 days prior to the due date.      Beach profile lines extended  approximately 150 feet landward  of the beach to 3000 feet offshore.    This project was similar in scope to  many others that we have  completed for the Jacksonville  District with the exception of the  photos and video that was needed.  The purpose of acquiring the  imagery was determine whether or  not seagrasses existed within the  borrow area. After researching cost  effective methods for obtaining the  images, we decided to use a GoPro  High Definition Digital Camera.  This low cost waterproof camera  provided high resolution images of  the seafloor a little cost to the  District. We attached the camera to a  pole that was lowered to the bottom.  The camera was rotated to get a string of still pictures at each location. The camera was then  rotated while in video mode.  These images verified that there seagrass was not growing in the  borrow area.    The beach profiles were surveyed with a combination of RTK/GPS for direct upland measurements.  A conventional total station for direct measurements in the water and a fathometer, RTK/GPS,  Motion Reference Unit integrated by Hypack for the offshore portions of the profile lines and the  borrow area.     C. Specific Project Experience Project Name: Survey #05-053 Brevard County North and South Reach Beach Renourishment Construction Surveys Client: U.S. Army Corps of Engineers Client Contact: Robert Swilley, PSM 904 232-1704 Robert.W.Swilley@usace.army.mil Cost: $265,325.00 Period: 5//2005 -9/2005 Brevard County SPP Monitoring Surveys‐ Jacksonville, Florida (Survey No. 06‐84 & 06‐085)‐  Completed Profiles/Cross Sectional surveys of 163 lines up to 6000 feet each extending from the  beach into the ocean.  RTK GPS and Hypack hydrographic software was used for the survey.  Project Name: Survey #06-122 Duval Beach SPP Monitoring Survey Cost – Period $27,196.00 - 7/2006 Survey #13-075 Duval Beach SPP Monitoring Survey $25,641.93 – 6/2013-7/2013 Survey #14-078 Duval Beach SPP Monitoring Survey and Borrow Area $27,091.11 – 5/2014-7/2014 Survey #15-176 Duval Beach SPP Monitoring Survey $28,872.73 – 12/2015-1/2016 Survey #16-094 Duval Beach SPP Monitoring Survey $26,047.65 – 4/2016-6/2016 Client: U.S. Army Corps of Engineers Client Contacts: Robert Swilley, PSM 904 232-1704 Robert.W.Swilley@usace.army.mil or Darin Moore, PSM 904 232-2471 Darin.L.Moore@usace.army.mil Degrove has completed this monitoring survey on six occasions for beaches in Duval  County. Some of these surveys tasks included construction monitoring as the government’s  surveyor representing the USACE.  C. Specific Project Experience As part of our IDIQ contract with the U.S. Army  Corps of Engineers (USACE) we were tasked  with completing topographic/hydrographic  profile surveys meeting the requirements of the  Florida Department of Environmental  Protection (DEP) “Monitoring Standards for  Beach Erosion Control Projects”. The surveys  have included up to 41 lines on each occasion  which begin approximately 150 feet landward  of the published or physical location of the  Coastal Construction Control Line (CCCL)  monument and extending easterly  approximately 3000 feet into the Atlantic  Ocean. In addition a hydrographic survey of a  three square mile borrow area located approximately 8 miles offshore was completed for Survey  14‐078.  We utilized RTK GPS, A Motion Reference Unit (MRU) to adjust for heave pitch and roll and  Hypack hydrographic data collection and processing software to complete the hydrographic survey.  The uplands were surveyed using a combination of RTK GPS and robotic total station. This survey  included a profile line adjacent to 1300’ pier.     Project Name/Cost: Survey #06-145 Nassau Beach SPP Plans and Specifications Surveys Cost – Period $29,439.00 - 7/2006-9/2006 Survey #08-003 Nassau Beach SPP Monitoring Survey $20,821.50 - 12/2007-1/2008 Survey #09-010 Nassau Beach SPP Monitoring Survey $16,707.00 - 11/2008-1/2009 Survey #14-152 Nassau Beach SPP Monitoring Survey $15,076.43 - 10/2014-11/2014 Survey #15-196 Nassau Beach SPP Monitoring Survey (pre and post) $53,910.98 – 2/2016-6/2016 Client: U.S. Army Corps of Engineers Client Contacts: Robert Swilley, PSM 904 232-1704 Robert.W.Swilley@usace.army.mil or Darin Moore, PSM 904 232-2471 Darin.L.Moore@usace.army.mil Survey Boat Entering Surf Zone Adjacent to Pier C. Specific Project Experience Degrove has completed this monitoring survey on six occasions for beaches in Nassau  County, the northern most beaches on Florida’s east coast. Some of these surveys tasks  included construction monitoring as the government’s surveyor representing the USACE.  The surveys required us to complete topographic/hydrographic profiles survey meeting  the requirements of the Florida Department of Environmental Protection (DEP)  “Monitoring Standards for Beach Erosion Control Projects”. The survey included of up to 47  lines beginning approximately 150 feet landward of the published or physical location of  the Coastal Construction Control Line (CCCL) monument and extending easterly  approximately 3000 feet into the Atlantic Ocean. In addition a hydrographic survey of a  four square mile borrow area located approximately 2 miles offshore was completed for  survey #06‐145.  We utilized RTK GPS, A Motion Reference Unit (MRU) to adjust for heave  pitch and roll and Hypack hydrographic data collection and processing software to  complete the hydrographic survey. The uplands were surveyed using a combination of RTK  GPS and robotic total station.   Project Name: Survey #08-078 Ft. Pierce Beach Renourishment Cost – Period $18,960.34 - 7/2008-8/2008 Survey #14-067 Ft. Pierce Beach Monitoring Survey $14,907.64 - 6/2014-9/2014 Client: U.S. Army Corps of Engineers Client Contacts: Robert Swilley, PSM 904 232-1704 Robert.W.Swilley@usace.army.mil Ft. Pierce Beach SPP Monitoring Surveys (USACE Survey #08‐078) – St. Lucie County, Florida  (Survey No. 06‐122) – After beach nourishment had been completed we were tasked with  completing  a topographic/hydrographic profiles survey meeting the requirements of the Florida  Department of Environmental Protection (DEP) “Monitoring Standards for Beach Erosion Control  Projects”. The survey included of 22 lines of beginning approximately 150 feet landward of the  published or physical location of the Coastal Construction Control Line (CCCL) monument and  extending easterly approximately 3000 feet into the Atlantic Ocean. We utilized RTK GPS, A Motion  Reference Unit (MRU) to adjust for heave pitch and roll and Hypack hydrographic data collection  and processing software to complete the hydrographic survey. The uplands were surveyed using a  combination of RTK GPS and robotic total station.   D. Approach and Methodology It is our understanding that the City of Sunny Isles Beach is in need of a Professional Surveying  firm to complete surveys along its shoreline that meet the requirements of the Florida  department of Environmental Protection, Bureau of Beach and Coastal Systems “Monitoring  Standards for Beach Erosion Control”. And have knowledge and expertise with the FEMA  Disaster Assistance Fact Sheet DAP9580.8.    While these standards and directives are specific in their desired deliverables and outcomes,  surveying in a surf zone requires a specific set of skills and equipment to safely and accurately  complete the work.      Approach     A. We will meet with the City and Miami‐Dade County to coordinate the work effort so  as to optimize the benefit to the City by minimizing the duplication of services.     B. We will contact Law Enforcement and Public Safety agencies to coordinate access to  the beach and nearshore waters so as to protect the safety of the public.      C. As required we will utilize National Geodetic Survey (NGS) 2nd order or higher  horizontal and vertical control points for establish coordinates and elevations for the  survey. More than likely when using RTK/GPS our base station will directly occupy an  NGS Vertical Control Monument. From research completed in preparation for this  submittal it appears that all NGS control monuments within the city have been  destroyed, more than likely due to construction.      We will be able to use control that we have previously set at Haulover Park that  meets the required standard to complete the surveys.    D. The horizontal datum will be established on NAD 83(90) State Plane Coordinate  System, Florida East Zone. The vertical datum will be NAVD 88.       E. We propose to use Real Time Kinematic (RTK) GPS for vertical and horizontal  positioning for both the topographic and hydrographic portions of the job. In some  cases when circumstances dictate (such as tall building that block GPS signals), A  robotic total station will be used.     F. Prior to commencement of work and at the end of the work day the topographic and  hydrographic survey crews will verify the accuracy of their respective GPS  equipment against a known control point. The horizontal and vertical control point  used will be verified with other control points in the area.      D. Approach and Methodology G. The automated bathymetric survey will begin.  The survey system will consist of our  26’ SeaArk survey boat and/or 14’ Demaree pontoon boat, Trimble RTK/GPS Base  Receiver and cellular modem, Trimble RTK/GPS Rover and cellular modem, Odom  MKIII and or CV100 dual frequency fathometers, TSS Motion Reference Unit (MRU)  and Odom Digibar Pro sound velocity probe and Hypack data collection and  processing software.   This automated process will allow us to pre‐plan the survey  and follow predetermined courses meeting the City’s specifications, to maximize the  data acquired in the minimum amount of time.      H. A critical element to completing the hydrographic survey is adhering to tried and  true methods that we have utilized for surveying in a surf zone. It is critical that a  motion reference unit is used as part of the hydrographic survey system. Even in  calm seas substantial errors will be introduced if heave, pitch and roll of the boat is  not compensated for. This error shows its face when a comparison is made between  overlapping upland and offshore data.    I. Sound Velocity profiles will be completed throughout the survey to correct for speed  of sound variations that are the basis for accurate fathometer readings.    J. The upland survey crew and hydrographic survey crew coordinate their activities to  ensure that their data overlaps. This is critical to quality assurance.    K. Upon completion of the hydrographic portion of the project, the resulting data will  be processed in Hypack prior to leaving the site.  This is done in order to verify the  completeness and accuracy of the survey data.    L. The Hypack data and upland data will be imported into Autocad.  This data will be  used to create a DTM.  The DTM will be reviewed and edited in order to create the  most accurate contours and volumes. From the DTM contours will be created at a  one‐foot interval.    Deliverables  1. ASCII file containing raw x, y, and z profile data points.    2. ASCII files containing the profile data processed into the DEP x.y,z or distance and  depth format. DEP format includes data as well as header records.    3. Monument Information Report (Given/Found/Used Report)    4. Complete federally compliant metadata file including methodology of the  data collection and processing procedures utilized in accordance with  D. Approach and Methodology standards set forth by the Federal Geographic Data Committee as referenced  in Part I.C.2 of this specification.    5. Copies of all checked, standard field books, computation and reduction files,  and abstracted final positions shall be provided to the FDEP. Field books  shall be scanned and pages amassed into a .pdf document for electronic  submittal.    6. Any other data or deliverables that the City or County require, such as volume  calculations and reports.    Schedule    The critical element to scheduling shoreline surveying services is weather and sea state. Not  only does high sea state affect the accuracy of the survey it introduces a safety hazard. This  type of work must be completed when seas are less than 3 feet. But, in fact it should be  done when seas are less than 2 feet. Entering the surf zone in a boat is hazardous when  waves are breaking.  Thus, it is critical that a large enough window of time be allowed by  the City to schedule services during calm conditions.    Without knowing the exact scope of services that will be required and working only on past  experience, it is anticipated that each survey event will take approximately one week in the  field and an additional week in the office to produce deliverables.   TEAM ORGANIZATION Project Manager / Lead Hydrographer Gordon R. Niles, PSM, CH President Field and Office Project Team dedicated to this project Technical Support/Hydrographer Randy Tompkins, PSM CAD Brenda Catone, PSM Party Chiefs Mark Coxwell Jon Struebing Brandon Coxwell   Education  Bachelor of Land Surveying, University of Florida, 1981.  FSMS Sectional Retracement Camp  Hypack Multibeam and Singlebeam Training Registrations: Surveyor and Mapper: Florida (1984) #4112 Land Surveyor: Georgia (1991) South Carolina (1992) Alabama (1994) Mississippi (2010) Louisiana (2011) North Carolina (2013) ACSM Certified Hydrographer (2010) Hypack Certified Hydrographer (2010) Affiliations and Awards: Florida Surveying and Mapping Society: Board Member of the Year (1994) Past President (1996-1997) Surveyor of the Year (1996-1997) Fellow Member (2008) Life Member (2011) FSMS – BPSM Liaison The Hydrographic Society of America Nat’l Society of Professional Surveyors UF Geomatics Advisory Committee Years of Experience: Degrove = 29 Total = 34 Software Proficiency: Hypack/Hysweep AutoCAD Land Desktop GORDON R. NILES, PSM, CH President Project Surveyor/Lead Hydrographer Mr. Niles is a licensed Surveyor and Mapper and is one of only 16 Certified Hydrographers in practice in Florida. He possesses knowledge and experience in a wide range of surveying and mapping services. Mr. Niles has been the sole owner and President of Degrove Surveyors since 1986. His professionalism, leadership, and knowledge of the industries we serve have made Degrove a Florida leader in surveying and mapping. Mr. Niles has over 30 years of experience and is licensed to practice in Florida, Georgia, Alabama, Mississippi, South Carolina, Louisiana, and North Carolina. He maintains a working knowledge of all projects to which Degrove is contributing. His accomplishments and awards illustrate his leadership not only at Degrove, but also in the greater surveying and mapping profession. Below you will find a sample of relevant projects in which Mr. Niles has acted as Degrove’s Project Manager. USACE – Topographic and Hydrographic Survey, Bal Harbour, Miami-Dade County (2013) – Project Surveyor for survey to support shoreline monitoring and shore protection design. Completed hydrographic survey in field as lead hydrographer and processed and reviewed data for delivery. USACE – Topographic and Hydrographic Survey, Broward County (2013) Project Surveyor for survey to support shoreline monitoring and shore protection design. Completed hydrographic survey in field as lead hydrographer and processed and reviewed data for delivery. USACE – Topographic and Hydrographic Survey, Nassau County (2016) Project Surveyor for survey to support shoreline monitoring. Completed hydrographic survey in field as lead hydrographer and processed and reviewed data for delivery. USACE – Topographic and Hydrographic Survey, Duval County (2016) Project Surveyor for survey to support shoreline monitoring. Completed hydrographic survey in field as lead hydrographer and processed and reviewed data for delivery. SWFWMD – Lake Panasoffkee Bathymetric Mapping Project – Sumter County (2011) – Project Manager for the complete Hydrographic Survey of this 3,200-acre lake and surrounding creeks. The lake’s shallow depth and extreme amounts of vegetation made typical processing methods impossible. Each survey line was manually digitized. USACE Jacksonville District – Milepoint Hydrographic/Topographic Survey – Duval County (2012, 2013) – Hydrographic Manager for this Hydrographic/ Topographic Survey of the Milepoint area at the confluence of the St. Johns River and the Intracoastal Waterway. Survey supported USACE and JAXPORT efforts to design and plan various shoreline/jetty modifications to the Milepoint area. 35   Education and Training  Bachelor of Science in Geomatics, University of Florida, (1999).  NGS OPUS Project Manager’s GPS Network Adjustment Training  NOAA-THSOA Multibeam Sonar Training, (2007). Registrations: Surveyor and Mapper: Florida #6503 Land Surveyor: North Carolina (2013) Affiliations: Florida Surveying and Mapping Society The Hydrographic Society of America Nat’l Society of Professional Surveyors Years of Experience: Degrove = 15 Total = 15 RANDY L. TOMPKINS, PSM Surveyor   Mr. Tompkins has managed a wide variety of surveying and  mapping projects for multiple public‐sector clients similar to  the District including the U.S. Army Corps of Engineers, and  SJRWMD and SWFWMD.  His experience in managing large‐ scale projects and his technical and software proficiency make  him an asset to the Degrove team.  He has extensive  experience in managing wide‐range geodetic control surveys,  as well as Right‐of‐Way, Boundary, Topographic,  Hydrographic, As‐built, and Quantity Surveys, and many other  general surveying services.  A sample of relevant Degrove  projects to which Mr. Tompkins has contributed is found  below.    USACE – Topographic and Hydrographic Survey, Bal Harbour, Miami-Dade County (2013) – Surveyor for survey to support shoreline monitoring and shore protection design. Completed hydrographic survey as crew chief responsible for offshore borrow area and preliminary data processing. Provided onsite technical support for electronics and software. USACE – Topographic and Hydrographic Survey, Broward County (2013) – Surveyor for survey to support shoreline monitoring and shore protection design. Completed hydrographic survey as crew chief responsible for offshore borrow area and preliminary data processing. Provided onsite technical support for electronics and software. USACOE Jacksonville District – Bartram Island, Cells A, B, F & G, Multiple Surveys – Duval County (2005‐ Present) – Project Manager for all Tasks since 2008. Degrove has performed various surveys at this unique island  disposal area in the St. Johns River.  Most recently, Degrove has been completing topographic/record surveys at  various phases of construction and using profile/elevation data to calculate earth volumes, which determine  payment received by the contractor.  Additional types of surveys performed have included:  Topographic,  Hydrographic, Control, Wetland Mitigation, Construction Stakeout, Volume Calculations for payment in  Construction Support, Design Surveys and As‐built Surveys.      USACOE Jacksonville District – Fisheating Creek Topographic and Hydrographic Survey(s) – Glades and  Highlands Counties – (2009, 2010) ‐ Project Manager for two separate Tasks for the Fisheating Creek  Watershed.  Degrove was tasked to collect topographic data on 288 cross‐sections (86 miles), 158 miles of road  centerline, 81 structures of various types, along with 96 miles of hydrographic data.  The first task in 2009,  approximately 40%, had a completion schedule of 90 days.  The project was delivered three weeks ahead of  schedule.    USACOE Jacksonville District – Fernandina Beach Renourishment Project – Nassau County (YEAR) – Completed  Volume computations for this 4‐mile beach renourishment project. Responsibilities included combining  hydrographic data, GPS data, and conventional survey data to produce a DTM used for volume computations on  an active construction site.  Degrove provided onsite surveying services 7 days a week for 4 1/2 months.         Education Bachelor of Science in Mathematics, University of North Florida (1994). Registrations: Surveyor and Mapper Florida #5447 Affiliations: Florida Surveying and Mapping Society Years of Experience: Degrove = 8 Total = 34 BRENDA D. CATONE, PSM Project Surveyor   Ms. Catone began her career in surveying as an Engineering  Assistant in the U.S. Air Force.  Her experience in managing a  wide range of surveying projects and her proficiency with a  variety of drafting software make her a versatile asset to the  Degrove team.  She has managed projects for many  public/government clients, including the U.S. Army Corps of  Engineers, U.S.D.A. Forest Service, and JEA.  Ms. Catone has  experience with many of the services listed in the Chapter F  Checklist, providing professional support including project  management, GIS, mapping, survey data analysis, deliverable  preparation, and QA/QC reviews.  A sample of relevant  Degrove projects to which Ms. Catone has contributed is found  below.      USACE – Topographic and Hydrographic Survey, Nassau County (2016) Surveyor supporting shoreline monitoring. Prepared deliverables to USACE requirements and Florida department of Environmental Protection,  Bureau of Beach and Coastal Systems “Monitoring Standards for Beach Erosion Control” standards.    USACE – Topographic and Hydrographic Survey, Duval County (2016) Surveyor for survey to support shoreline monitoring. Prepared deliverables to USACE requirements and Florida department of Environmental  Protection, Bureau of Beach and Coastal Systems “Monitoring Standards for Beach Erosion Control” standards.    USACE – Topographic and Hydrographic Survey, Duval County (2016) Surveyor for survey to support shoreline monitoring. Prepared deliverables to USACE requirements and Florida department of Environmental  Protection, Bureau of Beach and Coastal Systems “Monitoring Standards for Beach Erosion Control” standards.    USACE – Topographic and Hydrographic Survey, Mayport Naval Station Duval County (2013) Surveyor for survey to support shoreline monitoring. Prepared deliverables to USACE requirements and Florida department of  Environmental Protection, Bureau of Beach and Coastal Systems “Monitoring Standards for Beach Erosion  Control” standards.    USACE – C-111, Contract 8 Construction Support Surveys, Miami-Dade County (2016) Project Surveyor In charge supervising field crews and preparing deliverables, including as-builts topographic data, boundary surveys and construction stake-out to USACE standards. This work is to support the construction of part of the C-111 canal system in southwestern Miami-Dade County.    Westside Industrial Park – Duval County (2010) – Project Manager for the completion of boundary surveys with  flood certifications for 22 buildings at this 700‐acre industrial park.  A horizontal and vertical control network  had to be run throughout the entire site.  This project had an extremely demanding delivery schedule and was  completed on time.    JAXPORT – Blount Island Track Rehabilitation As‐built – Duval County (2013) – Project Manager for the as‐built  survey of the BIMT Track Rehabilitation for over 13,000 linear feet of railroad track reconstruction.      G. Current Client List/References Public Clients  U.S. Army Corps of Engineers – Jacksonville District Rob Swilley, PSM Robert.W.Swilley@usace.army.mil (904) 232‐1704  JEA (Jacksonville Electric Authority) Eileen Connolly (904) 665‐4325  Southwest Florida Water management District Jim Owens, PSM James.Owens@swfwmd.state.fl.us (352) 796‐7211 ext. 4163  Gainesville Regional Utilities Tiffany Davis DAVISTA@gru.com  (352) 393‐1216  City of Gainesville Pat Durbin, PSM durbinpr@cityofgainesville.org (352) 393‐8194  Gainesville Community Redevelopment Agency Andrew Meeker, RLA meekerag@gainesvillecra.com (352) 393‐8205    Private Sector Clients  Jacobs Engineering Jamey Wallace PE Jamey.Wallace@jacobs.com (904) 636‐5432  Mott, MacDonald Leslie Samel, P.E. leslie.samel@hatchmott.com (904) 203‐1081  The Haskell Company Tiffany Shaw, P.E. Tiffany.Shaw@haskell.com (904) 791‐4707  Jones, Edmunds and Associates Greg Perrine, P.E.gperrine@jonesedmunds.com (904) 744‐5401  TetraTech Greg Kern, P.E.Greg.Kern@tetratech.com  (904) 730‐4669 ext. 234  Dewberry Keith Patterson, PSM, SP, GISP  kpatterson@Dewberry.com  (904) 421‐8635  Kimley‐Horn Joe Mecca joe.mecca@kimley‐horn.com   (904) 828‐ 3900  Seefried Industrial Properties Paul Seefried  aulseefried@seefriedproperties.com (678) 904‐1908  Attachment 1. – Examples of Project Deliverables The following are deliverable for one profile line on the recently completed Duval County Beach project meeting the requirements of the Florida Department of Environmental Protection (DEP) “Monitoring Standards for Beach Erosion Control Projects”. Photos at profile line R-40: Florida Department of Environmental Protection Monument R-40 Attachment 1. – Examples of Project Deliverables Looking Northerly Along Beach Looking Easterly Attachment 1. – Examples of Project Deliverables Looking Southerly Along Beach Looking Westerly from Beach Attachment 1. – Examples of Project Deliverables The DEP now prefers x,y,z profile data with header records as opposed to distance and depth format even though the standards have not been officially changed. The following is this deliverable for a portion of profile R-40. Duval 2016 DEGROVE R040 MMM1989 00 2190267.651 530615.247 90 15.36 5/26/2016 5/25/2016 257 67 190 530992.24 2190267.55 0.69 d d – Denotes landward limits of survey 530585.07 2190268.34 10.30 530595.81 2190267.76 11.14 530604.26 2190267.41 14.25 530613.61 2190267.07 14.97 530620.82 2190266.56 13.71 530629.41 2190267.70 12.35 530639.20 2190268.97 10.90 530649.59 2190268.49 10.26 530659.08 2190267.82 10.64 530667.90 2190267.74 8.81 530676.95 2190267.45 8.82 530686.19 2190266.63 10.05 530693.75 2190267.78 11.34 530700.67 2190268.27 12.53 530711.46 2190267.91 11.54 530721.16 2190267.29 9.29 530730.35 2190266.77 9.13 530740.44 2190267.12 10.69 530749.56 2190266.50 12.88 530757.71 2190267.42 15.43 530762.07 2190267.38 15.43 530768.44 2190267.42 13.41 530778.17 2190267.21 12.79 530783.57 2190267.38 11.46 530787.16 2190267.42 10.51 530792.69 2190267.35 11.41 530798.67 2190267.35 11.73 530806.83 2190267.29 12.34 530815.81 2190267.52 12.16 530824.49 2190267.68 11.35 530833.36 2190267.48 10.31 530838.55 2190267.77 8.18 v v – denotes edge of vegetation 530847.00 2190267.83 6.24 530855.60 2190267.72 4.78 w w – denotes landward limits of wet sand 530864.65 2190267.49 4.21 530873.41 2190267.45 3.68 530882.41 2190267.66 3.09 530891.52 2190267.49 2.56 530900.27 2190267.79 2.11 530909.17 2190268.04 1.66 530918.30 2190267.46 1.33 530927.13 2190267.96 1.09 530935.91 2190267.78 0.84 530945.09 2190268.17 0.68 Attachment 1. – Examples of Project Deliverables The following is a portion of the delivered Metadata file for the Duval Beach project. Identification_Information: Citation: Citation_Information: Originator: Degrove Surveyors, Inc.(ed.) Publication_Date: 20160606 Publication_Time: Unknown Title: Survey #16-094 Duval Beach SPP Series_Information: Publication_Information: Publication_Place: Jacksonville, FL Publisher: Degrove Surveyors Inc. Larger_Work_Citation: Citation_Information: Series_Information: Publication_Information: Description: Abstract: Topographic and Hydrographic survey of a part of beach in Duval County, south of the St. Johns River, extending into St. Johns County. Purpose: The purpose of this survey was to collect topographic and hydrographic data at specified R monuments along the beach in Duval and St. Johns Counties and within the Mayport Naval Base in Duval County and northern St. Johns County. Time_Period_of_Content: Time_Period_Information: Single_Date/Time: Range_of_Dates/Times: Beginning_Date: 20160524 Ending_Date: 20160601 Multiple_Dates/Times: Currentness_Reference: Ground Condition Status: Progress: Complete Maintenance_and_Update_Frequency: None planned Spatial_Domain: Bounding_Coordinates: West_Bounding_Coordinate: -081-23-53 East_Bounding_Coordinate: -081-22-08 North_Bounding_Coordinate: +30-23-43 South_Bounding_Coordinate: +30-14-32 Keywords: Theme: Place: Place_Keyword_Thesaurus: Geographic Names Information System Place_Keyword: Duval County, Florida Stratum: Temporal: Access_Constraints: Attachment 1. – Examples of Project Deliverables The following is a portion of the “Monument Information Report for the Duval Beach project. Mon # published Y published X published Z Pt # observed Y observed X observed Z delta Y delta X delta Z Date Found R-35 2195018.01 530520.55 17.42 11205 2195017.455 530520.977 17.36 0.56 -0.42 0.06 5/24/2016 R-39 2191233.94 530514.89 22.88 11067 2191233.383 530515.749 22.782 0.56 -0.86 0.10 5/24/2016 R-40 2190267.65 530615.25 15.36 11034 2190267.258 530615.467 15.259 0.39 -0.22 0.10 5/24/2016 R-43 2187512.69 530753.42 13.20 10934 2187513.164 530752.639 12.933 -0.48 0.78 0.27 5/24/2016 R-44 2186562.99 530834.69 10.61 10912 2186562.753 530834.698 10.592 0.23 -0.01 0.02 5/24/2016 R-51 2179877.15 531457.78 11.70 10758 2179876.8 531457.682 11.652 0.35 0.10 0.05 5/24/2016 R-56 2175108.54 531795.85 14.73 10621 2175107.798 531796.641 14.701 0.74 -0.79 0.03 5/24/2016 R-60 2171422.95 532324.92 12.61 10504 2171423.013 532324.922 12.752 -0.06 -0.01 -0.14 5/24/2016 R-66 2165678.04 533360.42 11.59 10369 2165677.927 533361.359 11.596 0.11 -0.94 -0.01 5/24/2016 R-80 2152113.31 535913.48 12.33 10065 2152114.688 535912.302 12.206 -1.37 1.18 0.12 5/24/2016 City of Sunny Isles Beach |Request for Qualifications No. 16-06-01 17 ADDENDA ACKNOWLEDGEMENT INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: __________________________________________________________________________ SIGNATURE: ______________________________________________ TITLE: __________________________________________ DATE: _____________________ City of Sunny Isles Beach |Request for Qualifications No. 16-06-01 18 AFFIDAVITS PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach _____________ by____________________________________________________________________________ [print individual’s name and title] for____________________________________________________________________________ [print name of entity submitting sworn statement] whose business address is: _______________________________________________________________________________ _______________________________________________________________________________ and (if applicable) its Federal Employer Identification number (FEIN) is_____________________. (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:_________________________________.) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER 28, 2010 2 of 7 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ DECEMBER 28, 2010 4 of 7 DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a “X” after “Yes” or “No”. If you answer “Yes”, please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES __________ NO __________ 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES __________ NO __________ 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES __________ NO __________ If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. ________________________________________ ______________________________________ Firm Date ________________________________________ _______________________________________ Authorized Signature Print or Type Name and Title DECEMBER 28, 2010 6 of 7 State of Florida Department of State I certify from the records of this office that DEGROVE SURVEYORS,INC.is a corporation organized under the laws of the State of Florida,filed on December 10,1986. The document number of this corporation is J46442. I further certify that said corporation has paid all fees due this office through December 31,2016,that its most recent annual report/uniform business report was filed on February 11,2016,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Twenty-second day of June, 2016 Tracking Number:CU8420168708 To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 2131 Corporate Square Blvd. Jacksonville, Florida 32216 (904) 722-0400 Phone • (904) 722-0402 Fax www.degrove.com degrove@degrove.com