HomeMy WebLinkAboutReso 2000-220
RESOLUTION NO. 2000- Z. -"'0
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF SUNNY ISLES BEACH, FLORIDA, AUTHORIZING AN
AGREEMENT BY AND BETWEEN THE CITY OF SUNNY ISLES
BEACH AND CIVIL WORKS, INC., ATTACHED HERETO AS
EXHIBIT "A", FOR ENGINEERING SERVICES; AUTHORIZING
THE CITY MANAGER TO TAKE ANY AND ALL ACTION AS
MAY BE NECESSARY TO EFFECTUATE THE RESOLUTION;
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City has been negotiating with the Florida Department of Transportation
(FDOT) for the use of the parcels owned by FDOT, located east and west of the future City Hall
Complex; and
WHEREAS, in conjunction with that effort the City is required to provide alternative
stormwater drainage for the area; and
WHEREAS, Civil Works, Inc. has been "qualified" by the City Commission to perform
engineering services for the City of Sunny Isles Beach;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section1. Authorization of City Manager. The City Manager is hereby authorized to
negotiate said contract as outlined in Exhibit "A" attached hereto and do all things necessary to
effectuate the agreement.
Section 2.
Effective Date. This Resolution will become effective upon adoption.
~
~ASSED AND ADOPTED this ~ day of
, \ -", I' '.. '
'. : J. .
1"
',~~ ': _ J" .\" r
"r. I:.
ATTEST:
~2l~~o.
, , Ri0m;4 ~rctwn-Morilla, City Clerk
APPROVED AS TO FORM AND
LE C Y
Civil Works, Inc_res
4/7/00 11:0 I AM
1
Moved by:
Seconded by:
-~)'-/
Iu.., 0
Vote: S'" -~
Mayor Samson
Vice Mayor Morrow
Commissioner Iglesias
Commissioner Kauffman
Commissioner Turetsky
~ (Yes)
V (Yes)
V" (Yes)
~(Yes)
Z=(Yes)
_(No)
_(No)
_(No)
_(No)
_(No)
Civil Works, Ine_res
417/00 I LOI AM
2
- -0:J715700 --WE.l'-rz:tr4-..~.u-;Ju~n-~-1)-4bb--- --- ----\l.lTI:X.-l!VKl[;)-!"N\;-- u_
II/VOl -
II . f.'
....1 ----
CWI
EXHIBIT "A"
- -ClvIIWorks,=lnc.---
Miami - Ft. Lauderdale - Orlando
30~955 9~446568 407-33~O
www.clvilworks.comcwl@cMlworks.com
A WBElDBE flnn
March 10,2000
Mr. lack Neustadt
City Manager
City of Sunny Isles Beach
17070 Collins Avenue, Suite 250
Sunny Isles Beach, Fl33160
Fax to: 305-949-3113
Original By Mail 5 f2r
Re: Engineering Services for
Sunny Isles Blvd. Drainage System
eWI ProjeetNo. 99170.00
Dear Jack:
Civil Works, Inc. (CWI) appreciates this opportunity to provide the City of Sunny Isles Beach (the City)
with this proposal for engineering services to develop drainage plans for the above project This letter,
along with the attached schedule oftenns and conditions, will constitute our agreement. Our agreement
to provide services is based on the previous City selection of CWI as a General Engineering Consultant
to the City of Sunny Isles Beach.
We understand that the City wishes to develop the land between Sunny Isles Blvd eastbound and west
bound roadways and build the new City Hall Complex. This development including the City Hall
Building, a plaza and parking lot will make the existing ponds constructed by FOOT inoperative. CWI
will design and prepare construction documents for a new pumping station which will collect the runoff
from the four adjacent drainage systems. This preliminary drainage concept was outlined in an F:lorida
Department of Transportation (FDOT) memo dated August 26, 1999. Based on our conversations and
previous meetings, the following tasks would be provided for these services: .
TASK 1 .
DATA COLLECTION AND DESIGN ANALYSIS REPORT
This task will include researching and obta.ining copies of the previous design documents from the City,
FOOT and the other city consultants. This research will include obtaining the surrounding areas drainage
plans, the City Hall site plan, preliminary landscape plans. any other plans associated'Witb this area and
identifying the drainage permitting requirements.
Once the data has been sollected, CWI will review the previous calculations and drainage basins. The
various types of pumping systems will be compared for initial costs and operational costs. The pump
station and drainage design analysis will be based on various factors including the previously estimated
flows, the allowable total head flowing to each of the proposed drainage wells and the constraints of tbe
proposed City Hall site plan. A drainage report with conceptual drainage plans will be prepared in an 8-
l/2"x II" format. The report will include recommendations for a preferred pumping system which best
fits the needs of the City. The drainage concepts will be reviewed with the permitting agencies for
consistency with the latest drainage requirements. This report will be presented to the City for approval.
Ph: 3QS.448.5955
3195 Ponce de Leon Blvd.. Suits 200, Coral Gables, FL 33134
Fax: 305-448-5488
-- -V.n-.o1TUU- - --IU:;U-.L-~--'--Uv-r~-o1Uo1-'1~O-lJ-l(Ub-- -- -------v.I.-.-.l.-IJ--flUlU\-,:,---ln"-
-wuuz -
Mr. Jack Neustadt
March 10,2000
page 2 .
This task will also include assisting the City with the FOOT modifications to the Drainage pond listed as
Pond UX" at the intersection ofSR AlA and Sunny Isles Blvd. We understand the City's desire to modUy
this pond in order to show a positive image when entering the City. We will work with the FOOT to
replace the standing water with a temporazy solution until the pump station is operational.
TASK 2 - FINAL DESIGN PLANS
Upon the City's approval of the Design Report and the pumping system, CWI will finalize the design
plans from the conceptual report developed in Task 1 above. This task will include development offinal
construction plans, pmnp station location plans, drainage collection system modifications. drainage well
details, detail sheets, electrical plans, drainage calculations and any other criteria along with the
specifications for construction. The plans will be prepared in 11 "x 17" fonnat similar to mOT, at a scale
, which is legible for printing. Under this task, final plans and technical specifications will be prepared fur
the City's review. The City will provide the Ufront end" con1ract documents to CWI to be included in the
bidding documents.
It is anticipated that the storm water pump station will be located under the Sunny Isles bridge and therefore
no architectural plans are included in this project If architectural plans are required., eWI will be pleased
to work with any architect already under contract to the City. If preferred, we will provide a separate price
quotation for this work, if needed.
TASK 3 - PERMIT PROCESSING
Under.this task, CWI will process the drainage design. Based on past experience, the permitting will
include a preliminaty dry-run application and :final application from Miami-Dade County Department of
Environmental Management (DERM), a drainage well pennit from the Department of Environmental
Protection (DEP), an FDOT Special Permit for the modifications and connection to the existing FDOT
systems, and approval by the City for City w~rk. The drainage permitting usually is a very lengthy process
which can take several months to complete. This process will be started as early as possible in order to
complete the drainage system in a timely manner.
;"
TASK 4 - CONSTRUCTION OBSERVATION
Under this task, CWI will assist the City with bidding the proposed drainage project, reviewing the
contractors' bids ~d provide the City with a recommendation to award. In addition, CWI will assist the
City with coD81ruction observation based on weekly visits to the site, review of contractor's questions and
pay requestB. In additioDl eWI will perform a final job site visit, develop a punch list for the contractor
and perfonn a final project closeout inspection. This worle will be performed on an hourly basis and billed
at the hourly rates shown below. A budgeted amount has been provided for this work based upon an
anticipated constroction time of six months.
DELIVERABLES
Four sets of the Design Analysis Report
Four sets of 30% drainage plans for City review
Four sets of plans for the DEP Well pe~t
Ph; 305-448-5955
3195 Ponce de Leon Blvd.. Suite 200. Coral Gables. Fl33134
FalC 305-44&-5486
-u"-r~l)7UU. -"r;u--J:4:-:-Ul)-I'1Lr";:SUlf-4-~8-lf41nS
- -(;HTL .wORKS-INC-
-lafii03
. . 'Me. Jack: Neustadt
MarchIO, 2000 .
page 3
Four sets of plans for DERM permit
Four sets of plans for FOOT permit
COMPENSATION
The fees for providing Tasks 1 through 3 will be for the stipulated sums indicated below Task 4 will be
billed on an hourly rate as described under this task.
Task Number Description Stipulated Sum Budget
Task! Data Collection and Analysis Rf:port $16,100.00 N/A
Task 2 Final Design Plans 558,260.00 NlA
Task 3 Permit Processing 512,060.00 N/A
Task 4 Construction Observation N/A $25,000.00
Deliverables 5200.00 N/A
Total 586,630.00 525,000.00
Reproductions, printing, telecommunications and travel for the Tasks are included in the above fees. Any
additional serVices that you may require will be billed at the hourly rates shown below. Invoices will be
submitted monthly showing percent completion of stipulated sum items and any hourly fees authorized
for the project. All fees and reimbursable expenses for these services must be paid in full before any final
products are released.
HOURLY RATES
Cate:ory
Principal
Project Manager
Design Engineer
Technician/Staff
Clerical
Roor'-Y Rates
5120.00
$ 95.00
5 75.00
S 55.00
5 30.00
The above hourly rates, include all normal cash expenses as described under compensation in the
professiOnal service request.
Owner supplied items:
The following items shall be provided by the Owner:
1. Signed and sealed property swvey or plat of the Sunny Isles Blvd. Property.
2. Prel1minmy or final City Hall Site Plans and Details
3. Prelimiuaty landscape plans
4. Percolation tests.
Civil Works. Inc.
Ph.: (305) 448-5955
3195 Ponce de Leon Boulevard
Coral Gables. Florida 33134
Fu: (305) 448-5466
uOJr J;i,lTUU 'rI:'Jr~.I.~;V-i,l. rllA-.n'-i,l--"-"-O-41"VU
...,&:w....... '''Q&U''''-~.I.1''''
'WVU'I
. . Ml:.1ack Neustadt
MarchlO,2000n-
page 4
S. Application review fees.
6. Permit fees.
7. Any required field smvey required.
Schedule:
We undc:rst:and that the City would like to have the pump station operational before 1uly 2001 in order to
open City Hall in November 2001. Once the existing data has been collected, the Analysis Report would
be submitted within six to eightweeks. When the final recommendation for the pump station configuration
and location has been approved by the City, the constnwtion plans will be prepared. We anticipate three
months to prepare the final plans after approvals have been received. This would allow two months for
bidding and six months for construction.
If you concur with the contents of this agreement, please sign and date both copies of this letter and the
attached Professional Service Request. In addition, please initial and date the bottom of page 2 and 3 of
the Professional Service Request
Please return one signed copy of this letter along with the signed professional service agreement to our
office. We are prepared to begin our SeMces as soon as a signed agreement is received.
Please call me at 305-448-5955 if you have any questions.
I!Y
Sincerely,
Civil Works, Inc.
,...\
~. ~
Linda M. Bell, P .E. ",
President
Date
I
LMB/aa
Attachment: Professional Service Request
~
Civil Works, Inc.
Ph.: (305) 448-5955
3195 Ponce de Lean Boulevard
Cond Gables, Florida 33134
Fax: (305) 448-5466
- U-a7-riJTU-V- ,n..>>--..-.. .'f#'vr -.-.....-.....---- ----'--- -
... .-_.-------~- - -
0 ~ I. i _ N-I')- ~--
0
Ii .... did
J tIS 18 N Z Z
..- :.
.-0 .. . ~Iii
...
I 1 ! 0 2 0 0 I ~ 0 &1 ft 0 0 B l ~ ii !Bli I
~II IQ. ~ ; l ~ ~ ~ ~ m au
Q ~ = GI iii .. In rD ~ :I :;& :: tl I dlll~
g .... .... .. .. M
II .. lit
C .I
-d B
.a i CI -
. CI l!S ~ ! ~ ",I
-= = ~ 2i 0 CD l>> = ID ~ fD 2i
I GI .... ~ ..
D I~I ..- .... .-
. ....
CD ... .... ~
I '& 2 i
~ ... i "
en u II :!
Il!!l a = s 0 fa a a 0 2 ! ! ! CI 8 0 ! & n
ci lit .... N i a ~ N
~ U ... . a CD ..
Iii z lit .. lit M '" g
I 1$ ~ ~ g~ M .
4 < lit
0 - II U II
i It c i2 I CD 0 fD CD ~ ~ CD CD N CD CD CD CD ~
.... CI')
~ ~ w .....
...J
II. a: u :I:
-. - ..-
gj!!! 0 0 0 0 0 0 0 0 a & ~ t:a 0 a
M M 0 0 ~ Ie. ~ ~ a ~
N e&:t N U
:I:~ U fD .. - N c.; lit
Z .. .. .. M M
i < ~ en
a~ - z:
Ii I 0 0 0 0 0 N 0 0 0 0 .. ~ .. ~ 0
.. N CD ~ .. ~ !;i
.....
t; ~
::J
W -- ~
~ ~ Ie 0 g 0 0 0 0 0 0 0 0 0 I I 0 iil
::J 0 2 a 0 0 0 0 .- i Ii 0 0 l:Il
0 oj!!fIt C"lI. IE!. ID a "!. ... lIl!. In U 'i
- ... ..: ~ ..... u ..- .. .. GI
::J: =~. M .,. - lit lit ... IIJ IIJ mw
,
i a: ~ w if 6~
lL _&&.
zlii - ~ :Ii ~...
S2~ m co ~ ~ Ii &1 fD ~ ~ 0 CD CD CD CD 0 :) m~
..... .... CD
ffio N ClJus!
cffi i ~ a..mO
8 ,. :lilfC:o
a: ~l!ll 0 0 i 8 8 i Ii 8 i 0 0 0 0 0 m 3iB~O
~ = f;!. C"lI fcl ~ 0 :a
~~ m. CD CD 10 to CD N &q, ..... I! ~!i~
Ii ~~ lit ... ~ ~ ~ Cff N .... .... - N CD ~
- .,. .. lit M M .. lit '" ~
~ g iD <~CO
- c 1D~8...
.2 ~ CD 0 0 0 0 eEl CD 0 ~ CD CD fD ~ 0
,~ N .. CD Cl .. .... .... .... CD
i<< 51 M
Q.tI.) -- ....-.--
~ ~ i 0 0 0 0 a 0 0 fa 0 0 0 0 0
CD CD CD CD CD :f; CD II) ~ i ~ ~
S!~; .... .... GI at G) .... ~ GO ~
.. lit M M .. M lit lit 1ft 1ft
c.i i ~ ~~
<
.5 - ,
.r a ~ .. .. II) CD CD .. N .. CD ~ N N N Ii
i z
CII ii
0 c: a.. :I:
~ , . .
III
- . ~ c
'> c: ii ell
U 0 ~ a:
u /! E
m 14
.!I I DI III f
~ II) e DI e DI
IS CIJ us i , lIIlI e 1
lD -= m
~ :! 6 i CD lIIlI
11 III 1 I :i II :!
'a j a I it c :g 11II :i ell
ll.I i us ! CII ~ -
1ii r:: c: ~ I .!! .E l . =
I i i u lD i ... z: I
z Ii: Q.. I s I i.
f ~ t i j s ~ & i1 g ! l
0 CD
~ ~ aI m i 2 ; ~ b
z 15 ~ ~ I: I: ~ ii Q. ~
~ &! I- aI i! ! ~
u ~ ~ ~ ~ w ~
lld~ I ~ 0 0 0 m c 0 0
~ CDw 'j e
! ~. ~c ii: - , a.
- N p)
.8 B u
_.-,,-- .- . .-.... - . ..." . ....-1 ... ....... ... 'II I:
,/'
v~r~-VTVV-- -"IOI....-...-..----.VV-~ -.rv"iill--.....V-.,..VV-
- ..r..-"-.-., -,..._._.....,-..-.'fV--
- "a"-~y V
03/18/00
r~..' ~.
l
WE& 10; 18 p~ 3&5 4" 54'88
€IVlt W6BS INt:
IQOOJ:
. . ......
. .
r..~~~..~,...-..~....,.,.~~~.r-~-,---~--.... .:
. .; . ,-..
- - =.~=8~..~...........= ~.--~c~_c,~--'-_____--'--'----'-~~=--c-=-=-c__::cc"--=-=-,:=-~--,
.=. TI RErQIt c.*
********~~~+~~++~++++
r
1'RAN5Jl"rSStDli 01\'
T.IlRI. NO
CONNECTION TEL
C::ONNBctIOlll ID
ST. TDm
USAC:S If
PGS. SENT
RESULT
1117
S05949UU
03/15 10;14
c)2'OO
5