Loading...
HomeMy WebLinkAboutReso 2000-226 RESOLUTION NO. 2000-22k, A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AUTHORIZING AN AGREEMENT BY AND BETWEEN THE CITY OF SUNNY ISLES BEACH AND J.A.M. WELDING SERVICE INC., ATTACHED HERETO AS EXHIBIT "A", FOR REPLACEMENT OF IRON HINGES WITH STAINLESS STEEL HINGES ON THE TWO (2) FLAPPER VALVES IN THE DEEP WELL OF THE GOLDEN SHORES STORMWATER PUMP STATION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, flapper valves are required in the Golden Shores Stormwater Pump Station deep well to allow water to be pump into, but not flow back out from, the deep well; and WHEREAS, the Stormwater System cannot operate properly without functioning flapper valves, which have rusted open because of their iron construction; and WHEREAS, replacing the existing iron flapper valves with stainless steel is a long-term, efficient, and cost effective solution to this recurring problem; and WHEREAS, out of the five (5) qualified contractors contacted, J.A.M Welding Service, Inc. was the only contractor willing to provide services, outlined in Exhibit "A" attached hereto. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Contract. The contract by and between the City of Sunny Isles Beach and J.A.M. Welding Service, Inc. in the amount of $12,300.00, attached hereto as Exhibit "A," be, and the same, is hereby approved. Section 2. Authorization of the City Manager. The City Manager is hereby authorized to negotiate said contract as outline in Exhibit "A" attached hereto and do all things necessary to effectuate the agreement. Section 3. Effective Date. This Resolution will become effective upon adoption. PASSES AND ADOPTED this \gtl'- day of 1 ATTEST: :1Ci2i~~ '\. ..~ ."'..,' . ,/Ri(;'hatd~Browh:-Mbrilla, City Clerk . I ~ >,/ "4 ' ~ (. '----)' .'- "'.- .' ~ '-', ~. ~ AP~RO\{RD As to FORM AND '() LEGAL SUFFICIENCY - - \' I ' , \ ' --, -. .. '.~ I;" I " \.,) .. Vote: Mayor Samson Vice Mayor Morrow Commissioner Iglesias Commissioner Kauffman Commissioner Turetsky Moved by: ~ \c..cc..d\~n~ MOA~()w Seconded by: C.O'MW\. \<i\UPFIM~1J ~lYes) (Yes) --V(Yes) ~(Yes) ~(Yes) _(No) _(No) _(No) _(No) _(No) 2 . . / J.AM. WELDING SERVICE~ INC. 5791 COIl1lTleICe Lane South Miami, FL 33143 ~ r- 1 Henry Wello... ~ ; PROPOSAL I DATS r-;;12000 1 ~ I I I 1 I I I I I ==r=. I .--1 RATE n -I~ 12.300.00 I , QTY I OeSCRIPTlON f I Furnish and install a111abo~ and matetW ICl fabricate harch a:d- flapper valvos (same as el'dsting 0Zle) in stainless $ted maLeriIl Alloy , 316.16, rust resistant.. j The job CClDSist of assemble a scarf inside the W~ tank, dissemble . existing hatl:h and repl4cement ofboth hatch..,. I _I The whole work to be done in3idfl the SIDnn wBtel' tank at sito. .. The time to complB this work will be a woek. , . J , 18:1( exempt aD file I I r i I I I ~ Alvaro EBpino%a l ThaDk you f~ your bus~ Thank you, far allowing us to ~ OW' proposaJ.1fyou have any questiOJlS pleas~, feel free 10 call me at any tDnc. J 128 O.DO I ~TAL I ~N~ 188 1 TOTAL 12)00.00 0.00 $12,300.00