HomeMy WebLinkAboutReso 2003-518RESOLUTION NO. 2003-
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES
BEACH, FLORIDA, APPROVING CONSTRUCTION CHANGE DIRECTIVE NO. 4 IN
THE AMOUNT NOT TO EXCEED $9,547.00 BETWEEN THE CITY AND THE WEITZ
COMPANY FOR PILE INSTALLATION MONOTORING SERVICES,
COMPREHENSIVE CONCRETE STRENGTH MONOTORING AND TESTING
SERVICES ATTACHED HERETO AS EXHIBIT "A"; PROVIDING FOR THE CITY
MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS
RESOLUTION; AND PROVIDING FOR AN EFFECTIVE DATE
WHEREAS, by Resolution No. 2002 -478, the City Commission approved a construction
agreement between the City and the Weitz Company for the construction of the new Tony
Roma's restaurant; and
WHEREAS, certain services for the construction of Tony Roma's restaurant are not
performed by the Weitz Company and are needed to be contract out and approved separately by
City Commission; and
WHEREAS, the City Commission wishes to proceed on schedule with the construction
of Tony Roma's restaurant and has issued a Construction Change Directive to the Weitz
Company to contract the services of Mactec Engineering and Consulting Inc. for pile installation
monitoring and Professional Engineering & Inspection for the comprehensive concrete strength
monitoring and testing services and;
WHEREAS, the Construction Change Directive will constitute an amendment to the
guaranteed maximum price for the construction contract.
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section 1. Approval of Construction Change Directive. The City Commission hereby
approves the Construction Change Directive between the City and Weitz Company in the
amount not to exceed $9,547.00 for pile installation consultant services provide by Mactec
Engineering and Consulting Inc. and comprehensive concrete strength monitoring and testing
services provided by Professional Engineering & Inspection, attached hereto as Exhibit "A ".
Section 2. Authori , of City Manager. The City Manager is hereby authorized to do all
things necessary to effectuate this Resolution.
Section 3. Effective Date. This Resolution shall become effective upon adoption.
Construction Change Directive No. 4 TWC (ed) 1
JLV /ed
PASSED AND ADOPTED this ' 0 J day of �4k-�k1 _ , 2003
Gw
David SanjWon, Mayor
i- A;TTES �
Sy
Jane A. Hines, Aging City Clerk
APPROVED AS TO FORM
AND LEGAL SUFFICIENCY:
t
M. Dannheisser, City Attorney
Moved by:��n�I�y�1�
Seconded by:
Vote: S—D
Mayor Samson
Vice Mayor Edelcup
Commissioner Goodman
Commissioner Iglesias
Commissioner Kauffman
Construction Change Directive No. 4 TWC (ed) 2
JLV /ed
Yes) ) (N )
(Yes) (No)
�
-- J(Yes) (No)
Yes) (No)
Yes) _(No)
Yes) ) (N )
(Yes) (No)
�
-- J(Yes) (No)
Yes) (No)
Yes) _(No)
CITY OF SUNNY ISLES BEACH TONY ROMA'S
Project 0 F100000
18050 Collins Ave
Sunny Isles Beach
FL 33160
Tel: MS- 832 -2772 Fax 305 -932 -2996
Construction Change Directive
TWC, Detailed, Grouped by Number
Page 1 of 2
r
Directive Num : 004
Date Created: 1 002
The Weitz Conipany-Floridd is hereby directed to niake the tollowinq chanq(+") ill this contr;Ict:
a
The Owner has directed the Contractor to perform all Testing services originally specified to be performed by
the Owner. Production Pile installation and Monitering for a not to exceed amount of $6,000.00 as outlined in
the proposal prepared by MACTEC Engineering. NOTE: THIS IS FOR PHASE I PILES ONLY. Estimated
Not To Exceed Amount of $2,838,00 for Testing services for Tony Roma's Shell and Phase I Sitework to
Include: Concrete Test Cylinders, Procotor Tests, Densities, Limerock Bearing Ratio (LBR), Etc.
k
G951020 .2500
Testing Laboratory Services - Pile Observation
Is 6,000
G951020_ 2500
Testing Laboratory Services
$ 2,838
Z1020 .7205
Change Order Fee
$ 0
Y3020 •25W
.175% Data Processing
$ 15
Y5010_ 2500
.775% GL Insurance
$ 73
YW50_ 2500
.900% Sub Guard Insurance
$ 80
X301001_.2450
6% Overhead
$ 540
i otan $ 9,547
Pr000sed Adjustments
1. The proposed basis of adjustment to the Contract Sum or Guaranteed Maximum Price is:
[ ] Lump Sum (increasatdecrease) of
[ ] Unit Price of per
( ] As provided in Subparagraph 7.3.6 of AIA Document A201, 1997 Edition.
[X] Time and Material not to exceed
[ ] as follows:
2. The Contract Time as a result of this work will be unchanged.
3. Approval Required by in order to not delay the project.
upon wwcuuon Dy the Arcrinea and owner, this directive shall be effective immediately.
— - Z4� -'C L
ARCHITE T 6 O ER
•K t
Address: Ga , faAf, I SS: I �;W e0ut J 3 f0•-v'� -7" v
By: �'�r,3aridirar /d+ rf By: & --e L. . UX•A
Date: l • 21 .0 3 Date: z� 3
X -02 -03 02:0m FROWCITY OF SUNNY ISLES BEACH +3059d93113 T -008
305 947 0606 • r.,%x: 305 949 3113
C I T Y OF S U N N Y I S L E S B E A C H
P.02106 F -STS
CITY CoMMMICIN
To:
Jim Marshiaao, Weitz Company
UAVI,U SAN SUN
Larry Klein, Spillis Candela
MAYnK
NORMAN S. F.nRI.C;UP
VuT MAYOk
From:
Jorge L. Vera ---
,..L
l;l ?RRV C OUDMAN
Zoning Direc
CUMMISSIUN I ,R
1):�i•Ih1' ICiL,:•I1,�
Date:
December 30, 2002
COMMISSION tit
:UMM 1k)N R`�N
Re:
Construction Change Directives (CCp)
C:hntn,Phcr Itu;m,
city Wnag-r This is notice to the Weitz Co. to proceed with contracting the fum of
Lynr1 M. nannh".m.r Mactec for the Pile Installation Monitoring and related services. This
constitutes Construction Change Directive No, 1. Attach is Mactec
Rmnasl Hrown•M.nlh proposal to the City.
Chy C:luk
0
r--1
JC -02 -03 02;03PM FROM -CITY OF SUNNY ISLES BEACH
December 20, 2002
+3059493113 T -009 P. 03/06 F-676
%J' MACTEC
City of Sunny Isla Beach.
17070 Collins Avenue Suite 250
Sunny Isles Beach, Florida 33160
Attention: Mr. Jorge L. Vera
Subject: Proposal to Provide Production Pile Instaliation Monitoring n � S 00
Tony Roma's Restaurant l
18050 Collins Avenue
Sunny Isles Beach, Florida, Florida
LAW Proposal No. 40799 - 0-0000 Phase
Dear Mr: Vera
Thank you for the oppormnity to provide you with this proposal for the production pile
installation monitoring services. We understand that a total of 120 piles approximately 30 to 40
feet in depth will be installed.
Scope of Services
• Compensation
Authorization
SCOPE OF SERVICES
Based on our experience from ira pecting the installation of the production piles on this project
and on other similar projects, the following is an outline of the scope of engineering services
we are prepared to provide for the production pile installation:
1. Production Pile Installation Monitoring
Provide a qualified augercast inspector to:
• Calibrate the grout pump (it units or cubic feet per stroke).
• Monitor the addition of any water and/or admixtures to the grout at the site and
performing flow cone tests, if required
MACTEC Engineering and Consumng, Inc.
5845 NW 158th Street
Miami Lakes, FL 33014
3054M-Na - Fax: 3oS- 826.1799
www.mactec.com
JPI -02 -03 02:03PM FR0WCITY OF SUNNY ISLES BEACH +3059493113 T -008 P.04/06 F -M
Tony Rome s Resm ff" December 20, 20M
MAMC Engineering and Consulting, Inc. Propose! No. 40700-0-M Phare
it Make grout cubes.
• Observe the drilling process and noting any relevant irregularities.
• Approve the pile augering termination criteria and recording the pile up
elevation prior to pumping.
• Observe and document the grouting procedure, noting the depth of the auger tip
during and delays in grouting, and the time of any delay during pumping.
• Record the total autriber of pump strokes for the determination of the actual
grout volume pumped into each pile. Calculate theoretical pile volume and
grout factor.
• Periodically record the grout pressure during pumping and the rate of
withdrawal of the auger.
• Monitor the setting process of the fresh grout based on actual samples taken at
the time of arrival on site. Grout, which reaches its initial set, should not be
used.
• Observe fresh- grouted piles to determme whether any settling or grout
subsidence occurs.
• Monitor the installation of reinforcing steel in the piles.
2. Grout Testing
Perform compressive strength testing on grout cubes prepared during production pile
installation.
3. Final Report
Provide a final report documenting the production pile inanllations.
We will provide field representatives to conduct field monitoring and sampling. The final report
of field results will be signed and scaled by a State of Florida Registered Professional Engineer,
Our work does not include supervision of direction of the actual work of the contractor. Neither
the presence of our field representarive, nor the observation and testing by our firm, shall excuse
The contractar in any way for defects discovered in his work.
E
JI,V -02-03 02 :03PN FROM -CITY OF SUNNY ISLES BEACH +3059493113 T -008 P.05/06 F -6T6
"Pony x0hu -s XesrMa" Decmber 20. 2002
MA=C fnginuring and Consulting, Inc. Proposal No. 407W 44Q0i00 Phase
It is understood that our firm will not be responsible for job safety on this project. Job and site
safety will be the sole responsibility of the contractor. We will endeavor to conduct our services
in a safe warmer and we reserve the right to decline to perform our services its unsafe conditions.
COMPENSATION
Compcasation for the services outline above will be based upon the actual time spent and tests
performed in accordance with the rates shown on the following pages. Based on our experience
with augercast installation, we anticipate that the installation will be complete within 10 to 14
workdays.
• Monitoring of Pile Installation (65 hours @ $45/ hour) ............. ............................... $2925
• Grout Testing (6 sets of 6 cubes per set @ $36/ set) ................... ............................... $216
• Pile Installation Report/Eagineering Project Management ...... ............................... $1,750
• Mileage (250 miles 0 $0.42/ mile) ................... ............................... $105
• Additional Engineering Consultation (As necessary and requested) ..... $90.00/Hour
Based on the above project scope sad the estimated project and eda,
we estimate a budget of approxbutely $4,996. This does not ' overtime ours for
Saturday, Sunday, or Holidays. We suggest a not -to- exceed budg of $6,000. amount
will not be exceeded without your approval and authorization.
AUTHORIZATION
If you would like to authorize us to provide the Conatraction Materials Testing and Inspectiou
Services and to make this proposal, our statement of General Conditions, and other enclosures
the agreettuat between us, please complete the attached Proposal WG* Acceptance Sheets
(PWAS) and return thern m us. A complete ecoecuted PWAS will be retutred to you. Any
exceptions to this proposal or special requirements not covered in the proposal should be listed
on the Proposal Acceptance Sheet.
Should you have any questions regarding this infornsation presented hear A Please fccl free to
call our office. We appreciate your confidence in MACTEC, and eagerly look forward to
continuing as Part of your construction quality control tears. Please call us with any questions or
comments you may have regarding the services outlines in our proposal.
IA -02 -03 02:03PM FROM -CITY OF SUNNY ISLES BEACH +3059493113 T -006 P.06 /06 F -676
1 ony woma's mmauraw December 20, 2002
MACTEC Engineering and Comsulting,lnc. Proposal No. 4070"4000 Phase
If you have any questions regarding this infomation, please contact us at (305) 825 -5588
very truly yours,
MACTEC ENGINEERING AND CONSULTING, INC
Manager
Distribution: Aimee (2)
File (1)
G:\?Mpo"a CMT ftposal 7mw ABC - TbwRo=SRestaum-&c
0
4
G. U IN"
Tiloxnas McDaniel, P.E.
Principal Ceotechuicai Engineer
JAM 21 2003 9:59RM THE WEITZ COMPRMY 5G1 -686 -7774 P.1
Fraject No.: F190909
Frejed Now= CITY OF SUNNY ISLE BEACH TONY ROMA'S
Sabovutrad No.: MOM
The Weitz Compaaj- Floridst
Standard Form Subcontract Agreement
Between Contractor and Subcontractor
Thb Subcontract Agreement ("Agreement") is dated U2MM and is coterrd into
MZTVAM r
The Weft CanapsuW4 wjft (tlEe "Csntradm"'}
5611 yiAeHI"L, Swift 120
West Pain Besdl., FL 33409
t'lieee_ 561436-5511 IF= 561-0* -7774
Atte robes: JIM AIARSUMNO 941ok ==vbvwae@wei x9M
AND
PRonssionAL ENGinEzRimp & IlgSI"icnoN (tie "Sahea■itrwc/es"'j
IMW WZff bTATtROAD $4, SUTTL #E1
FORT LAURDLRDAL$, FL 33325
P<rsuft 8004MI796 Fu: 334 - 2364109
Attemioen: PAUL DAMFOli.IH 9iw&
Fed" am:
license Number.
1111 CO1�II�E,"i'IttPl Wl'TH
CITY of SUNNY MX9 EEACH T WT MOKA'S {the" Pmjcd -)
18050 CalliwAve
Smn7 Liles Deacb, FL 33160
Pbos= 305432-2732 Fac 36"32-29%
AS JONSIGNIM BY
SVM Candela (the "Aiuhitecfj
800 Douglas lid.
Coral Cabksy, VIL 331341
FOR
C* of Stymy Isla Be=* (iie'pf0wom" )
1709 CeEm Ate, a M
8w=T bb lksd4 FL 3311"
Attenffwn: lwv Virg
Con9amr and Owner have eaknd two aCWMnwtfw*tPmjoct, which Caabactis hcmanAsschua8toom the
"Prima CaosocC and p widw for the f mddft of labor, nowidt aqdpmud and =vim in conamik a
WMdMCMMMXdM4uf dic Pfoja *- In amactiou Willi the Pmjeck ft Coffer and Saboontractoc agree as
follows:
Fags 1 42
`'JAN' 21 2003 9:59AM THE WEIT2 COMPANY 561 -606 -7774 p_2
r ",m No.: T1s0000
Plsjeet Name CITY OF SUNNY I_SGFS BRACH TONY ROMA'S
Sahnudract No-: FIO0009
ARTICLE 1
Sobcontract Sum
1.1 saieaolratt Sthm The (What man (--SWemmxt Sum°) pa}sbie to SA"Wmcft for the proper palix � and
a xopWm of the Subwabaetar's Work is S2A3&00, which Smbommm Sum nwindes an appticabh; rake,
C0 ma, (Deal open sad sinidw taam trq*cd to be paid by SvbconmwW or Comactor in commcfion wits
dhis Age such taxes are biclodod at M
I.2 Csrt Coie:. The SA"nUW Seat iaciodes the "awing (host Padas m and Cost Codes
Toga Sums: $2,93LOO
ARTICLE2
Srahoaol+rad�"s Wont
2.1 Subcon#ractorIs WoffiL The "SubcontioGim 's Weik mwhdea all items re4mved or Fcasonabdg %fen*dc for the
proW pofounnaa and campletioa of the WoA ( the "lifiodO of to Pnoject_ The SubeoaritactWs Wort m
deambW m KAsibft A attached hereto and mawporawd Jimm by this reference.
7.2 Rsiubit A (Scope of Work) doad 1/2InW3, RAM& B (Dommethts) dated 22titit2tltt2, CA" C
(Sp xW Terms and tovzditiom) dated 12110IM2, lsWdW B (Standard Terums and ComMiam) dated 12flOnW2,
Ed" E (schedule) dated 13 -02.02 and KAMR F (Spocud Fwvmm ApFlmibk ody to FROFFMWAL
ENGD4BBRING & D4P' MON) dated n/s, if applicaW to be used on this Proj= art ate bcmo ad
iscmpamted herein by this vchsmr-
IN Wrt1r M WHET WF, the patties ban amocuted this Ageemeat by Am datg soMonndiepmemitiftm +osh
tine daft atfadh below, to be e#le tm ma 1/2I M I
PW 2 On
17070 Collins Avenue • Suite 250 • Sunny Isles Beach, FL 33160
'rr.l.: 305 947 0606 • r• :\.\: 305 949 3113
C I T Y O F S U \t \ Y I S L E S B 13 A C }-I
Un' COMMISSION
DAVID SAMSON
MAN OR
NORMAN S. r :ulsl.(:ur
\'ICE NM OR
GERRY000DNIAN
COMMKMOSER
DANNY IG.ESI:U
COMMISSIONER
1.11.4 KAUFF \IAN
COM\IKMO]ER
Ch,iswphrc I. R.,sn
Cin' NN.mc r
Lann \I. Dannhws,,
lane A. Kline
Acting City Clerk
February 25, 2003
Mr. Jim Marshiano
The Weitz Company
560 Village Blvd., Suite 120
West Palm Beach, FL 33409
oz - r /P
Re: Approving Construction Change Directive No. 4 per Resolution No. 2003-
518
Dear Mr. Marshiano:
Attached please find a copy of the above - mentioned resolution, adopted by the
City Commission on February 20, 2003, for your records.
If you have any questions, please do not hesitate to contact me.
Sincerely,
Jane A. Hines
Acting City Clerk
JAH:mw
Attachment
c: Christopher Russo, City Manager (copy of letter)
Jorge Vera, Planning and Zoning Administrator
Jean Watson, Finance Director
Fr OF fuN F-
City of Sunny Isles Beach
17070 Collins Avenue, Suite 250
Sunny Isles Beach, Florida 33160
(305) 947 -W6 City Hall
(305) 949 -3113 Fax
(305) 947 -2150 Building Department
(305) 947 -5107 Fax
MEMORANDUM
To: The Honorable Mayor and City Commission
From: Jorge L. Vera, Planning and Zoning Administrator
Date: February 20, 2003
Re: Construction Change Directive for Tony Romas
RECOMMENDATION
City Commission
David Samson, Mayor
Norman S. Edelcup Vice Mayo
Gerry Goodman, Commissioner
Many Iglesias, Commissioner
Lila Kauffman, Commissioner
Christopher J. Russo, City Alanager
Lynn JI. Dannheisser, City Attorney
Jane Hines,Acting City Clerk
Staff recommends approval of the construction change directive for the construction of Tony
Romas Restaurant in the City Hall complex.
REASONS
There are some construction services that have not been included in the contract with the Weitz
Company for the construction of the Tony Romas Restaurant. The services are a part of
construction, but they are performed through a separate company and contracted by the City. The
services include but not limited to, monitoring of piles, the testing of the concrete, inspections and
reports from engineers of the findings which are then sent to the City's building department.
There will be times that these services will require to be contracted before they are heard and
approved by the City Commission. In such cases and after a review of the additional charges for the
required services, the City will be giving the Weitz Company a Construction Change Directive to
proceed with the services and contract with these companies. These changes are not modifying the
Guaranteed Maximum Price that the Gty Commission has already approved. The changes will only
occur when such a change cannot be brought before the City Commission on a timely manner and
would cause delays in the construction schedule.