HomeMy WebLinkAboutReso 2004-642 RESOLUTION NO. 2004 - ~ 4~ A RESOLUTION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVINGAMENDMENTNO.2TOCONTRACTBYANDBETWEEN THE CITY OF SUNNY ISLES BEACH AND SPILLIS CANDELA & PARTNERS, INC., FOR ADDITIONAL ARCHITECTURAL SERVICES WITH RESPECT TO THE NEW GOVERNMENT CENTER FACILITY LOCA TED AT 18070 COLLINS A VENUE, IN THE AMOUNT OF ONE HUNDRED NINETY -ONE THOUSAND, NINE HUNDRED TWO DOLLARS ($191,902.00), A TT ACHED HERETO AS EXHIBIT "A"; PROVIDING FOR EXECUTION BY THE MAYOR; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUA TE SAID AMENDMENT; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, by Resolution No. 2002-413, dated January 17, 2002, the City Commission approved an agreement between the City and Spillis Candela and Partners, Inc., for architectural services with respect to the new Government Center facility located at 18050-18070 Collins Avenue, and approved Amendment No.1 for Threshold Inspector and design of a grease trap system for Tony Roma's Restaurant via Resolution No. 2003-539; and WHEREAS, pursuant to Article 4, Section 4.13, the City requests additional architectural services for the new Government Center Facility, which is not included in the basic services under the Agreement; and WHEREAS, Spillis Candela & Partners, Inc., have provided the City with a proposal, for the additional architectural services described above, in the amount of $191,902.00, bringing the total contract amount to $818,262.00, as set forth in Exhibit "A", attached hereto; and WHEREAS, the City, being satisfied with the performance and quality of workmanship of Spillis Candela & Partners, Inc., wishes to contract with Spillis Candela & Partners, Inc., to perform this additional work. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Amendment No.2 to Contract: Amendment No.2 to Contract by and between the City of Sunny Isles Beach and Spillis Candela & Partners, Inc., for additional architectural services to be performed for the new Government Center facility located at 18070 Collins Avenue, on the terms and conditions as more fully set forth as Exhibit "A", hereto, be, and the same is, hereby approved. 1 Spillis. Candela Approval of Amendment No, 2 to Agmt For new Government Center Section 2. Execution by Mayor: The Mayor is hereby authorized to execute the Agreement between the City and Spillis Candela, for architectural services. Section 3. Authorization of City Manager: The City Manager is hereby authorized to do all things necessary to effectuate the terms of the Contract. Section 4. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this 19th day of February, 2004. , ATTEST:' " ~ -'~ "...... . L , ~ , ~<. . l" ,; Jane A. Hines, Ci~y Clerk < APPROVED AS TO FORM AND G SUFFICIENCY: Second by: ('Q>~ IGLE~Hq~ d~l5S.tb1\W &'R.~21 tV Moved by: VOTE: :)-{) Mayor Edelcup Vice Mayor Goodman Commissioner Brezin Commissioner Iglesias Commissioner Thaler yes V no yesV no= yes V no_ yes Vno_ yesJLno_ 2 Spillis, Candela Approval of A1rendment No, 2 to Agmt For new Government Center AMENDMENT NO.2 TO CONTRACT BY AND BETWEEN THE CITY OF SUNNY ISLES BEACH AND SPILLIS CANDELA & PARTNERS, INC. DATED February 19, 2004 WHEREAS, SpilUs Candela & Partners, Inc., were hired by the City as Architect-Engineer to plan, design, and provide construction administration for the new City Hall as identified by the contract referenced above, which contract was approved by Resolution No. 2002-413; and WHEREAS, pursuant to Article 4, Section 4.13, the City requests additional services as City Hall Threshold Inspector and also the design of a grease trap system for the Tony Roma's Restaurant, not heretofore included in the Basic Services under this contract; and WHEREAS, Spillis Candela & Partners, Inc., have provided the City with a proposal, dated October 14, 2003, for the additional services described above, in the total amount of ONE HlJ"r-iDRED AND NINETY-ONE THOUSAND NINE HUNDRED AND TWO DOLLARS, ($191,902.00); and WHEREAS, the City, being satisfied with the performance and quality of workmanship of Spillis Candela & Partners, Inc., wishes to contract with Spillis Candela & Partners, Inc., to perform this additional work; NOW THEREFORE, in accordance with the terms of Article 4 and Consultant's proposals in the total amount of $191,902.00, and the City hereby amends the contract as follows: 1. The original contract amount is hereby increased by One Hundred and Ninety-One Thousand Nine Hundred Two and No/lOO Dollars to Eight Hundred Eighteen Thousand Two Hundred Sixty Two and No/I00 Dollars ($818,262.00). 2. All other terms and conditions of the contract remain the same. ::'~A~fNC' Deborah S.Klem. CFO. Vice-President ATTEST: By: -=l~A..oUi~, . Jane A. Hmes, Clt){'Clerk, It'..~ ~ 3 I 04'.. mey Date: Exhibit" A" Spill is Candela Contract Amendment No, 2 Attorney/Contractsljb ;" 800 Douglas Entrance North row~r. Second Floor "tal Ga,bles. Fl 33134 )05.444.4691 , '305.447.3580 www.scpmiami.com Peter I. Spillis,AIA Hilario F. Candela, FAiA Julio Grabiel, AlA Aramis Ajvar~z. AlA Guillermo Carreras, )'1iA Donald Cwore. FAIA Dean K. Newberry. !IDA Jesus Cruz, AlA Oeborah 5. Klem Michael Kerwin. AlA Paul Reinarm.ln W, Ronald Hunt, PE .Jors~ Iglesias. AlA Enrique J. :>iada, AlA Sundy O'Neil Los Angeles San Francisco Orange Phoenix Albuquerque Houston Miami Orlando Chicago Columbus New York Washington. DC Denver Colorado Springs Sail lake Ot." Fort 'North Dallas Detroit San Diego Los Alamos Rlchland. WA Kuwait City Spil!isCMdeIaI October 14, 2003 Mr. Christopher Russo, City Manager City of Sunny Isles Beach 17070 Collins Avenue, Suite 250 Sunny Isles Beach, Florida 33160 Re: Additional AlE Fees Based on Increased Schedule, Increased Construction Cost and Construction Administration Services Beyond Contractual Scope. Dear Chris, Thank you again for the opportunity to meet with Jorge Vera and Calvin, Giordano and Associates on October 9th, in order to resolve the issue of additional professional fees and extended construction administration efforts. As requested by Dennis Giordano during our meeting, following is a detailed description of the reasons why the drawing schedule was lengthened beyond our contract scope, the City-requested architectural elements and materials that resulted in the increased construction cost and the sequences that will require our construction administration services to extend beyond the frequency and duration of our contractual limits. Spillis Candela DMJM is requesting additional professional fees for the Tony Roma's and City Hall project. These fees, primarily incurred during the construction documents drawing effort, were the result of numerous delays / revisions by Romacorp and City-requested enhanced site amenities, building amenities and architectural materials for the City Hall and parking structure.The construction cost for the City Hall and garage increased from approximately S10,000,000 to the GMP amount of approximately SI5,000,000 due to the addition of those amenities and materials. Following is a more detailed description of those additions and changes to the original contractual scope: Project Phasing: · The Spillis Candela DMJM contract stipulated that the design and document preparation for Tony Roma's and the City Hall were to be prepared concurrently. Combining the two projects was the most efficient and cost effective way for the architectural and engineering team to produce the drawings required for permit. Because of the need by Romacorp and the City to reduce to a minimum the "downtime" of the restaurant, phasing required the Tony Roma's be completed and occupied prior to the start of the City Hall construction. This required phasing, forced the drawing effort for the two projects to be consecutive rather than concurrent and therefore creating a significantly longer and more costly drawing schedule for SCDMIM. In addition, securing design approval from Romacorp was long-delayed by their internal changes in consultants and even after approval, was subject to their own reversals because this was a new prototype within the chain. These events transfonned a simple 8-week drawing effort by SCDMJM, into a more than 24-week drawing effort that impacted us financially. Increased City Hall Square Footage: .. · The gross building area for the City Hall increased from our contract scope of 45,000 sf to 60,000 sf in the approved design (a 33% growth in area) due to the program requirementsand space needs desired by the City. Open vs. Closed Parking Garage: · The City requested that the parking structure be enclosed rather than open, resulting in increased cost for the structure, architectural wall materials and mechanical ventilation.This change was requested in order to visually hide the cars from view and better integrate the parking structure with the City Hall building. This change occurred late in the design effort requiring Spillis Candela DMJM to significantly modify the existing drawings and provide additional engineering efforts in order to mechanically ventilate the garage. These additional services were never invoiced to the City. Building Amenities: · Civic amenities such as the Council fountain, street paving, enhanced landscaping and enhanced exterior lighting were requested by the City to be maintained in the approved design. These are amenities that are traditionally associated with Civic Buildings and are commensurate with the quality of the adjacent new Collins Avenue developments being designed and constructed in Sunny Isles today. Value engineering efforts between the client. contractor and architect established the potential cost savings for these items, but the City's decision was to increase the construction budget and maintain these elements in the design. Durable Architectural Materials - Life Cyc:Ie Cost Benefits: · Enhanced and more durable building materials were requested by the City to be maintained in the approved design; these included architectural precast concrete rather than stucco for the main building envelope, granite panels rather than metal panel or stucco for the elevator / stair tower and glass mosaic tile rather than stucco for the Council Chamber exterior. Although requiring a greater up front cost, these materials will provide greater durability with lower maintenance costs over the life of the building.Value engineering efforts between the client. contractor and architect established the potential cost savings for these items but because of the issues mentioned above, the City decided to increase the construction budget and maintain these elements in the design. Our professional services contract, article 9 established the fee for architectural and engineering services. The table below reflects the contract amounts, the amounts actually spent. the contract multiplier and the overage incurred by SpiIIis Candela DMJM because of the above-described issues. The amount spent in excess of our contract fee to prepare architectural and engineering documents (Schematic and Construction Documents) for the City Hall and Tony Roma project is $191,902. Direct Person. Cost 2.95 Multiplier Contract AlE Fee Loss Schematics $26,772 $78,977 $72.600 $6,377 Construction Doc $179,839 $530.525 $345.000 $185,525 $191,902