HomeMy WebLinkAboutReso 2004-749 RESOLUTION NO. 2004-'1'-\'\ A RESOLUTION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO ENTER INTO AN AGREEMENT FOR THE ACCEPTANCE OF A GRANT AWARD IN THE AMOUNT OF FOUR HUNDRED THOUSAND DOLLAR ($400,000.00) WITH THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT TO FUND THE CENTRAL ISLAND STORM DRAINAGE AND STREET IMPROVEMENTS CAPITAL IMPROVEMENT PROJECT IN ACCORDANCE WITH EXHIBITS "C" AND "D"; AND FURTHER PROVIDING THE CITY MANAGER WITH THE AUTHORITY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Flood Mitigation Project was partially funded by the 2004-20005 State Legislature General Appropriation Act funds from the Florida Department of Environmental Protection (FDEP) through Special Appropriation 2064A and by the South Florida Water Management District's General Ad Valorem Funds; and WHEREAS, the City, under its Capital Improvement Plan, has completed the final design drawings for the Center Island Storm Drainage and Street Improvements Plan and will utilize these funds for the construction ofthe storm drainage mitigation project; and WHEREAS, the objective of the storm drainage project is to improve the City's stormwater capabilities. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH AS FOLLOWS: Section 1. Authority of the City. The City Commission hereby authorizes the City Manager to enter into an agreement for the acceptance of a grant award in the amount stated above with the South Florida Water Management District provided said agreement is reviewed by the Office of the City Attorney. The City Manager is also authorized to do all things to effectuate this Resolution. Section 2. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this q~ day of December, 2004. R2004- SFWMD $400,000 Grant For Central Island I ,., ~. 1:.. . ,ATTpST: .' ~jQ~t\.:'w~ Jane Hines, City Gle.rk ( . APPROVED As TO FORM AND LEGAL SUFFICIENCY VOTE: 5~D Mayor Ede1cup Vice Mayor Thaler Commissioner Brezlin Commissioner Goodman Commissioner Iglesias ./ (Yes) v (Yes) v (Yes) .,/ (Yes) ./ (Yes) R2004- SFWMD $400,000 Grant For Central Island Moved by: V i ~e. K~ or "'\hq,l-e...e.. Seconded by: CoMI\I\i $~i~ .I~le.s,",,~ (No) (No) (No) (No) (No) 2 EXHIBIT "C" . STATEMENT OF WORK CITY OF SUNNY ISLES BEACH CENTER ISLAND STORM DRAINAGE AND STREET IMPROVEMENTS INTRODUCTION The City of Sunny Isles Beach (City) Flood Mitigation Project (Project) was partially funded by the 'W04/2005 State Legislature General Appropriation Act funds from the Florida Department of Environmental Protection (FDEP) through Special Appropriation 2064A and by the South Florida Water Management District's (District) General (Ad Valorem) Funds. These funds are administered through the District and dispersed and managed at the local level. The City is located within the northeast comer of Miami-Dade County and is bounded by to the north, to the south, to the west and to the east. The City has developed a multi-phased Stomlwater Master Plan (Plan), which was adopted by the City Council in . The City recognized the need to address its stonnwater challenges through the implementation of this Plan. The existing drainage system has historically consisted primarily of roadside inlets connected to outfaIls located throughout the City. In some cases, the outfall structures are no longer discharging, or are undersized for the volume they are expected to handle. The system provides poor levels of flood protection and provides no treatment of storm runoff. There are structures in disrepair and in need of immediate replacement. The poor levels of flood protection are mainly the result of low grades and poor conveyance that impede positive drainage during a storm. This undesirable scenario potentially lends itself to short and long term flooding conditions within the City. These deficient conditions, added to the characteristics of a flood high risk area due to the proximity of the project to the Bay, plus the fact that the existing drainage system is not in compliance with the required minimum FDOT standards on flow and water quality, justify the need for an upgraded system. OBJECTIVE The objective of the Project is to improve the City's stormwater capabilities by providing a positive drainage system to surface waterways in the geographic area. The Project will provide for improved flood protection while maximizing water quality treatment of storm runoff prior to discharge through typical treatment methods and best cost effective available technologies to meet the requirements of the National Pollutant Discharge Elimination System (NPDES) permitting program, All improvements within the Plan will be phased and the proposed phase is described in Section 3.0 of this Statement of Work. SCOPE OF \VORK The City, under its Capital Improvement Plan, has completed the final design drawings for the Center Island Storm Drainage and Street Improvements Plan and will utilize these funds for the construction of this storm drainage mitigation project. The improvements of the stonn water system will benefit numerous residents Page 1, Exhibit "C", Statement of Work, OT050655 of a residential area of about 96 acres, bounded from west to east by North Bay Road and Collins Avenue. and from south to north by NE 174 Street and NE 183 Street. The proposed storm drainage improvements involve the construction of ex-filtration piping systems including the following main elements: · Drainage Structures (91 Units) · Manholes (37 Units) · Storm Sewer Collection System (11.900 Linear Peet) · Ex-filtration System (6.100 Linear Feet), · Drainage Wells (24 units) · Milling and Resurfacing (35,421 Square Yards) The project governing standards and specifications are: · 2004 Plorida Department of Transportation Roadway and Traffic Design Standards · 2004 Standard Specifications for Road and Bridge Construction · Miami-Dade County Public Works Manual Parts I and II. The implementation of the project will be as follows: The project final design plans are completed. Bids will be due by January 2005. Construction is to be completed in twelve (12) months. The preliminary construction cost estimate for this project is $ 4 million. The City shall be responsible for the satisfactory completion of all work under this Statement of Work. This Statement of Work will focus on activities that include the following tasks: Task 1: Engineering Design and Permitting Task 2: Preparation of Bid Documents and Specifications Task 3: Construction., Construction MonitorinW'Monthly Reports Task 4: Construction Certification The Project will meet the regulatory requirements of all government agencies with pennitting jurisdiction. WORK BREAKDOWN STRUCTURE At the end of each task, the City shall deliver Three (3) copies of the task deliverables to the District. The District shall distribute the copies to the FDEP for its information and use. The City shall also provide a summary of the project including estimated cost to the District upon completion of Task 3. The District shall distribute the project summary including estimated cost to the designated coordinator for the Local Mitigation Strategies Group for its information and use. Proiect Management The City, or its designated consultant, as applicable, is responsible for project management, budget management and quality control. The City is responsible for reviewing and approving deliverables from the consultant to ensure that the project objectives are met. Page 2, Exhibit "e", Statement of Work, OTOS0655 Task 1: Engineering Design and Permitting · Prepare and submit to the District lOO% engineering plans · Prepare and submit to the District construction costs estimates for the proposed work. · Submit to the District proof of application for applicable permits. Deliverables: Summary Report of engineering plans update including submittal of 100% engineering plans and the information described in this task number 1. Task 2: Preparation of Bid Documents and Specifications · Prepare and submit to the District Bid Documents. · Prepare and submit to the District specifications. · Prepare and submit to the DISTRICT bid and contract award documents. Delh'erables: Summary Report of bid documents and specifications update including submittal of the information described in this task number 2. Task 3: Construction, Construction Monitoring/Quarterly Reports · Submit project summary with final engineer's cost estimate. · Advertise Bid and conduct pre-bid meeting. · Monitor the construction of the proj ect and submit progress reports and construction invoices. · Receive and open bids. · Prepare bid tabulations and evaluate for successful bidder. · Award Bid. · Construct improvements as identified in 100% design plans, specifications and applicable permits. · Prepare and submit to District construction schedule(s), quarterly construction progress reports, quarterly pay requests, and quarterly updated construction project schedules. peliverabJes: Submit to District work documents and information described in this task 3. Task 4: Construction Certification · Provide final certification and as-built drawings upon completion of construction. Deliverables: Provide to the District final certification and as-built drawings upon completion of construction. Page 3, Exhibit "C", Statement of Work, OT05065S EXHffilT "I)" PAYMENT AND DELIVERABLES SCHEDULE Total payment by the District to the City shall not exceed the amount of 5400,000.00. All invoices shall be accompanied by adequate documentation to support actual expenditures incurred by the City within the not-to- exceed amounts specified below in accordance with ~~ of the Ag~elI!~nt. Payment by the District is further subject to receipt of quarterly progress reports and fmanciaI statements from the City with documentation to demonstrate completion of each project task in accordance with Exhibit "en Statement of Work requirements. The City is responsible for reviewing and approving deliverables to ensure that project objectives are met. The City is also responsible for project management, budget management and quality control. DISTRICT** N ot-to-Exteed Task Deliverable Due Date. Payment Total Cost SUmma!)' Report of engineering plans update including submittal of 100% engineering plans and the information Task I: Engineering described in this task Desirn and Pennittine: number 1. months $ $ Summary Report of bid documents and specifications update including submittal of Task 2: Preparation of the information Bid Documents and described in this task SDecifications number 2. months $ , $ Task 3: _months Construction, Work documents and Pay requests may be Construction Monitoring information described submitted on a and Reporting in this task number 3. Quarterlv basis. $ $ Final certification and as.built drawings upon completion of Task 4: construction and an months - Construction Operations and Certification Maintenance Plan $ $ Not-to-Exceed Total Payment ) 5400,000.00 $ '" All dates are referenced from the date of contract execution. ** The District shall only be obligated to pay for documented actual expenditures within the not-to-exceed amounts specified above. In the event actual expenditures by the City are less than the not-to-exceed for a particular task, the City shall have the right to apply the unexpended balance towards a subsequent task. The City shall provide written notice of its decision to exercise this right. In no event shall the District's total obligation exceed $400,000.00 as specified above. Page 1, Exhibit "0", Payment and Deliverable Schedule, OT050655 SJNNy isip Cityof SunnyIsles Beach CinCommMayor S. oe ,Jr 17070 Collins Avenue, Suite 250 Lewis J.Thaler,Vice Mayor Roslyn Brenn Commissioner 5'fI SunnyIsles Beach,Florida 33160 Gerry Goodman,Commissioner ;\ " )305) 947-0606 City Hall Danny Iglesias,Commissioner w 305 949-3113 Fax " r ) I LynChrn M.Danheisser,City Manager E •r eons )305) 947-2150 Building Department Lynn M.Dennheisser,City Attorney or sum ." (305) 947-5107 Fax Jane A.Hines,City Clerk MEMORANDUM TO: The Honorable City Commission FROM: Christopher J. Russo, City Manager DATE: December 9, 2004 RE: $400,000 GRANT FOR CENTRAL ISLAND STORMWATER PROJECT RECOMMENDATION It is recommended that the City Commission adopt the attached resolution accepting a four hundred thousand dollar($400,000.00) grant from the State. REASONS The existing drainage system in the Central Island is in disrepair and in need of immediate replacement. It has poor levels of flood protection, mainly the result of low grades and poor conveyance that impede positive drainage during a storm. The City is desirous of rectifying this problem by replacing and repairing of the drainage system. This will benefit the residents and businesses of the City To offset the cost of this project, the City sought and has been awarded a four hundred thousand dollar($400,000.00) from the State. ADDITIONAL INFORMATION The City of Sunny Isles Beach Flood Mitigation Project was partially funded by the 2004/2005 State Legislature General Appropriation Act funds from the Florida Department of Environmental Protection (FDEP) through Special Appropriation 2064A and by the South Florida Water Management District's General Ad Valorem Funds. These funds are administered through the District and dispersed and managed at the local level. CJR/pw C.nnai-S4 XJ,lvw s,onnaater Grant Agenda Memo Agenda Item RD I. Date I2-09-0`1