RESOLUTION NO. 2005 - .2:1.CL
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
SUNNY ISLES BEACH, FLORIDA, AWARDING BID NO. 04-12-02
GOLDEN SHORES ENTRANCE WALL TO TENEX
ENTERPRISES;AUTHORIZING THE CITY MANAGER TO
NEGOTIATE AND ENTER INTO AN AGREEMENT WITH TENEX
ENTERPRISES, INC., FOR CONSTRUCTION OF THE GOLDEN
SHORES ENTRANCE WALL, IN SUBSTANTIALLY THE SAME
FORM AND AMOUNT ($195,376.00), AS THE AGREEMENT
ATTACHED HERETO AS EXHIBIT "A", PROVIDING THAT ANY
CHANGES ARE APPROVED AS TO FORM AND LEGAL
SUFFICIENCY BY THE CITY ATTORNEY; PROVIDING THE CITY
MANAGER WITH THE AUTHORITY TO DO ALL TmNGS
NECESSARY TO EFFECTUATE THE TERMS OF THIS
AGREEMENT; PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City issued Bid No. 04-12-02 for the Golden Shores Entrance Wall; and
WHEREAS, the City held a Bid Opening on January 20,2005, resulting in one (1) bid being
received; and
WHEREAS, the City has determined that Tenex Enterprises, Inc. was the most responsive,
responsible bidder; and
WHEREAS, the City wishes to award Bid No. 04-12-02 to and enter into an agreement with
T enex Enterprises, Inc. for the construction of an Entrance Ramp Barrier Wall for Golden Shores, in
a total amount of One Hundred Ninety-Five Thousand Three Hundred Seventy-Six Dollars
($195,376.00), attached hereto as Exhibit "A".
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section 1. Award of Bid. The City hereby awards Bid No. 04-12-02 Golden Shores Entrance
Wall to Tenex Enterprises, Inc., 12452 Wiles Road, Coral Springs, Florida 33076.
Section 2. Authorization of City Manager. The City Manager is hereby authorized to negotiate
and enter into an agreement with Tenex Enterprises, Inc. for the construction of the Golden Shores
Entrance Wall, in substantially the same form and amount ($195,376.00), as the agreement attached
hereto as Exhibit "A".
Section 3. Further Authorization of the City Manager. The City Manager is hereby authorized to
do all things necessary to effectuate the terms of the Agreement.
R2005- Golden Shores Entrance Wall
Section 4.
Effective Date. This Resolution will become effective upon adoption.
PASSED AND ADOPTED this 10th day of February 2005.
ATTEST:
...~\A~(~~
Jane A. Hines, City Clerk
. .
Apprpv~d As to Form and
Legal Sufficiency:
~~ City Attorney
Seconded by:
Cb~ Got)\)fnlTtU
Co ~ e"R~7,.,tJ
Moved by:
Vote: ~-O
Mayor Edelcup
Vice Mayor Thaler
Commissioner Brezin
Commissioner Goodman
Commissioner Iglesias
L(Yes)
=:1Z(Y es)
----.tL(Y es)
~es)
(Yes)
_(No)
_(No)
_(No)
_(No)
_(No)
R2005- Golden Shores Entrance Wail
2
III f Cai~in, Giorda~o & A"ssociates, Inc.
;.. j Engineers · Surveyors · Planners
i .
Reply to:
rVi 1800 Eller Drive, Suite 600
'"'\' Fort La!1derdale, FL 33316
. Phone: 954.921.7781
Fax: 954.921.8807
o 560 Village Blvd., Suite 340
West Palm Beach, FL 33409
Phone: 561.684.6161
Fax: 561.684.6360
www.calvin-giordano.com
it
RECEIVED
JAN2 5 2005
City of Sunny Isle8 Beach
Otflceof the City Manager
J3)luary 24, 2005
"
Christopher J. Russo, City Manager
CITY OF SUNNY ISLES BEACH
. ,0
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
Re: Sunny Isles Beach - Golden Shores Entrance Wall
Bid'ResultsIRecommendation of Award
CGA Project No. 04-4801
City Bid No. 04-12-02
Dear Mr. Russo:
One (1) bid was received on January 20, 2005 for the above referenced project
and are tabulated as sho.wn on the attachment. The bid has been reviewed and
checked for calculation errors. Tenex ,Enterprises, Inc. of Coral Springs, Florida
was the low bidder with a total base bid of $195,376.00. Their bid was lower
than the Enginee:r:'s Estimate of$206,508.50. Licenses, references ai'td bonding
capacity of Tenex Enterprises, Inc. were verified. .
This' office recommends tqat the award of the contract. be made to the lowest
responsible and eligible bidder, Tenex Enterprises" Inc. m the amount of
$.195,376.00 based upon unit prices.
If YOlt have any questions or reqUIre anything further, please contact the
undersigned. .
Sineerely,
~ANO & ASSOCIATES, INC.
Y:d -72-
J. Scott Gombar, P.E.
Director of Cal'ital Improvements
JSG/sb
Attachment
cc:
Dennis J. Giordano,. CGA
File
P:\Projects\2003\034138 SUNNY ISLES\Correspondence\Letters\Golden Shores Entrance Wall\Rec award. doc
SUMMARY OF BID PROPOSALS RECEIVED
FOR: Golden Shores Entrance Wall
LOCATION: City of Sunny Isles Beach
DESCRIPTION
BID OPENING: 01/20/05
11:00 AM
City Bid No. 04-12-02
CGA Project No. 04-4801
Signature
Prepared by Calvin, Giordano & Associates, Inc.
I hereby certify that the following is a true
summary of proposals received:
Date
TOTAL
ITEM
AMOUNT
Tenex Enterprises, Inc.
Coral Springs, FL
TOTAL
ITEM
AMOUNT
Engineering Estimates
UNIT
PRICE
I. GENERAL
Furnish and Install eight-foot (8') high Pre-
Cast Concrete Barrier Wall including coping
and caps.
2 Furnish and Install coping on existing barrier
wall
3 Remove and dispose of chain-link fence
SUBTOT AL GENERAL
4 Mobilization and Demobilization of all
equipment and personnel (10% of Subtotal)
TOTAL BASE BID (ITEMS 1.4)
AMOUNT OF PROPOSAL GUARANTEE
SURETY
COMMENTS
QUANT.
UNIT
UNIT
PRICE
920
517
LF
LF
$200.00 $103,400.00 $198.00 $102,366.00
$72.00 $66,240.00 $65.00 $59,800.00
$35.00 $18,095.00 $30.00 $15,510.00
$187,735.00 $177,676.00
517
LF
LS
$18,773.50
Page 1
$18,773.50
$17,700.00
$17,700.00
$206,508.50
$195,376.00
5%
Cashier Check No. 3940600
$5,000.00
[
I
,
I
SECTION 00300
BID FORM
Bid of ~rW)( C~r;:se5, ]nc. .
Address \ 2'-1~2 (~): le6 ReL Corc"J Sprd1f:) s, J I 3;)07" G
Phone 9~y - SIO_Gtoo
To furnish all materials, equipment and labor and to perform all work in accordance with the Contract
Documents for construction of: Golden Shores Entrance Wall include coping and caps, and
construction of +/- 920 linear feet of coping on existing barrier wall located in CITY OF SUNNY
ISLES BEACH.
To: CITY OF SUNNY ISLES BEACH
17070 Collins Avenue, Suite 250
Sunny Isles Beach, Florida 33160
The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work
and is familiar with the nature and extent of the work and any local conditions that may in any manner
affect the work to be done.
The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding
Documents, in the manner prescribed therein and to the standards of quality and performance established
by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or
combination of items stipulated. Unit price line items shall include cost of implementing all applicable
safety requirements. Bidder acknowledges that estimated quantities scheduled are approximated for the
sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual
quantities required may increase or decrease. Bidder further agrees that payments will be made on the
basis of actual quantities placed and accepted in the construction
12/04
00300-1
04-4801
Golden Shores Entrance Wall
UNIT PRICE BID SCHEDULE
Item
No. Description
I. GENERAL
1 Furnish and Install eight-foot (8') high Pre-Cast
Concrete Barrier Wall including coping and
caps.
2 Furnish and Install coping on existing barrier
wall
3 Remove and dispose of chain-link fence
Estimated
Quantity Unit
517 LF $
920 LF $
517 LF
SUBTOTAL GENERAL
3 Mobilization and Demobilization of all
equipment and personnel (10% of Subtotal)
4 Having examined the place of the work and all
matters referred to in the Instructions to Bidders
and the Contract Documents prepared by
Calvin-Giordano and Associates, Inc., the
Engineer for the above referenced project, we,
the undersigned, hereby offer to enter into a
Contract to perform the work of the base
contract for the Lump Sum Price which
includes the entire project as shown on the
plans and described in the specifications.
Unit Price
Estimated Amount
, 9~
'S-
30
$ \0 l. 3"6
sq'6<t>o
\55\0
\,\ (1.6
$
$
$
LS $ ,"\ \ (!) 0 $ \ \ \ ~ 0
LS $ $
GRAND TOTAL GENERAL $ \ q '5 31 6. 0 t
o N IF -h \J ~ () rL bO 'A ~ 't'\ t f " '( e"11f{) v $fWD ---r'Kve..e h \I "'~ R6J)
'8tV[Nf-Y <:s,'rA.;{Oo ((b>
[^J~'R
12/04
00300-2
~ ~--4.
(}'- ~a tLo~S
04-4801
BID SECURITY
Accompanying this Bid is a certified or cashier's check or a bid bond in the amount of $ 5% of the bid or
$5,000.00, whichever is less made payable to the Owner which may be forfeited as liquidated damages if,
in the event this proposal is accepted, the undersigned fails to execute the Agreement and furnish and pay
for the required performance and payment bonds for the Owner within 10 days after acceptance of the
Bid; otherwise said certified or cashier's check or bid bond will be returned to the undersigned.
The undersigned Bidder agrees to commence work within l.Q days after the date of written Notice to
Proceed, and further agrees to substantially complete the work within 120 consecutive calendar days after
the date of written Notice to Proceed, subject to such extensions oftime allowed by the Conditions of the
Contract.
The undersigned Bidder also agrees to complete the entire work within 150 days after the Contract time
commences to run.
The undersigned Bidder agrees that this Bid shall be good and may not be withdrawn for a period of 90
days after the scheduled closing time for receiving bids.
The undersigned agrees to forfeit to the Owner, as liquidated damages for each calendar day elapsing
between the date established as the date of substantial completion and the actual date of such substantial
completion of the contract work, the amount of $500.00 per calendar day.
The undersigned further agrees to forfeit to the Owner, as liquidated damages for each calendar day
elapsing between the date established as the date of final completion and the actual date of final
completion ofthe contract work, the amount of $500.00 per calendar day.
ADDENDA
Bidder acknowledges the receipt of Addendum No.'s
1. 1. , 2.
,5.
,3.
,4.
Dated this --LL day of G"'-'
(month)
<L 00.'1
(year)
--..
Contractor:
\ EM ~J... e;.J 7E It f ilT S ~ Sf f4C.
\ j...L(;2\.1;~ Wo -.. L. / C. '(~. '5 e (l1J{ G (7-(. 330 7 ~
Address:
*
SEAL
*
Attachments:
Subcontractor List
Bid Security
Trench Safety Act documentation
END OF DOCUMENT
12/04
00300-3
04-4801
I
I
6. Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. [Indicate which statement applies]
Neither the entity submitting this sworn statement, nor any of its officers, directors, executives,
partners, shareholders, employees, members, or agents who are active in the management of the entity, nor
any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July
1,1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives,
partners, shareholders, employees, members, or agents who are active in the management of the entity, nor
any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July
1, 1989.
The entity submitting this sworn statement, or one or more of its officers, directors, executives,
partners, shareholders, employees, members, or agents who are active in the management of the entity, nor
any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July
1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the
State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. [attach a copy of the final order]
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY
AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT
IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO
ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION
287.017, FLORIDA STATUTES FOR CATEGORY TWO OF ANY CHANGE IN THE INFORMATION
CONTAINED IN THIS FORM.
Sworn to and subscribed before me this II
/~"",:]
day of ~yUiCLj
~
,20C
Personally known
/
OR Produced identification
Notary Public - State of ./floc-l.ll Gt.-
(Type of identification)
.....~.tr~"',.. Maria Liliana latiegue
f.r~ ~;~ MY COMMISSION # 00221148 EXPIRES
~i'~"~,; June 9, 2007
";tiif:,'f;";r."" BONDED THRU TROY fAIN INSURANC~ INC
Fonn PUR 7068 (Rev. 06/11/92)
00402-2
04-4801
~{~
....
..
.
~1t
.
I
DOCUMENT 00403
TRENCH SAFETY ACT
(90-96, Laws of Florida)
Bidder acknowledges that included in the appropriate bid items of the proposal and in the Total Bid Price
are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida) effective October 1,
1990. The bidder further identifies the costs of such compliance to be summarized below:
Trench Safety
Measure
(Description)
Unit of
Measure
(LFSF)
Unit
(Quantity)
Unit
Cost
Extended
Cost
A.
B.
C.
D.
/\/1/1
Total $__ tf -
If applicable, the Contractor certifies that all trench excavation done within his control in excess of five
feet in depth shall be in accordance with the Florida Department of Transportation's Special Provisions
Article 125-1 and Subarticle 125-4.1 (TRENCH EXCAVATION SAFETY SYSTEM AND
SHORING, SPECIAL - TRENCH EXCAVATION).
Failure to complete the above may result in the bid being declared non-responsive.
Contractor agrees that the above safety compliances and costs are included in his bid package.
12/04
\~- ~
Signature of Bidding Contractor
END OF DOCUMENT
00403-1
04-4801
7.
8.
12/04
DOCUMENT 00420
INFORMA nON REQUIRED FROM BIDDERS
GENERAL INFORMA nON
The Bidder shall furnish the following information. Failure to comply with this requirement may cause its
rejection. Additional sheets shall be attached as required.
t
I.
2.
Contractor's Telephone Number: '-) Sy Si 0 - 0100 .
Contractor's License: CNC-r ~ yY)ctiar 'Rc>o..d - # 98-11QJ0 -X
Primary Classification: ~ T --, . \ ~ t '
vi vuJO/( C1 ) Y
Number of years as a Contractor in construction work of the type involved in this Contract:
3.
4.
5.
List the names and titles of all officers of Contractor's firm:
Jdo.JrvrUd .f~\ ) lO{~t) /r( ~S} rlF;(l-t
I
6.
Name of person who inspected site or proposed work for your firm:
Name: ~oryyJd .fat ilod \~
7th
Date of Inspection:
()OfY'
Zoo~
What is the last project of this nature you have completed?
City of We3ton_ Saddle OUb Rd @ ~)th POSI- Rd
. . Roundaboo+ .
Have you ever failed to complete work awarded to you; If so, where and why?
/'/0
00420-1
04-480 I
I
9. Name three individuals or corporations for which you have performed work and to which you refer:
12-1 eo-S~
~e
Ojfo c heJ
10. List the following information concerning all contracts on hand as of the date of submission of this
proposal. (In case of co-venture, list the information for all co-ventures).
NAME
OF
PROJECT
TOTAL
CONTRACT
VALUE
CONTRACTED
DATE OF
COMPLETION
%
COMPLETION
TO DATE
CITY
Deo~
~e anc,,-c,hed
(Continue list on inset sheet, if necessary)
11. What equipment do you own that is available for the work?
Loader J fu~c k~'e, Com bl{\(l~ I On
EaDer) ~b C,oj- .
12. What equipment will you purchase for the proposed work?
NOTE: Attach additional sheets if required.
If requested by the City, the Bidder shall furnish a notarized financial statement, references and other
information, sufficiently comprehensive to permit an appraisal of his current financial condition.
12/04
00420-2
04-4801
-c-- --
N
o
I'-
o
I
o
..-
LO
---~
Q)
~
u.
o
o
I'-
o
I
o
..-
LO
..t
LO
Q)
.:.J
w
~
I'-
o
M
M
..J
U.
en
C>
z
c::
0-
CI)
..J
~
o
u
o
<(
o
e::
CI)
w
..J
~
N
LO
'<t
N
..-
1-
z
o
i=
w
..J
0-
:2
o
u
c--_ ---
~
Z
::::l
o
:2
<(
w
:2
<(
z
~
u
w
....,
o
e::
0-
z
o
i=
<(
u
o
..J
~
U
~
Z
o
U
'"
0)
ro
(3
o
'"
-:2
D/l
iB ~~g
Fa, ~ ....
~~Q-
e:0e:
t:Q)-
In'~>
em I e Iii
~ 10- cj
LO
o
o
N
.0
0)
u.
LO
o
o
N
e:
III
....,
LO
o
o
N
C
III
....,
- f-- ~ - c-- ---c-r- - - - --
o
CO
..-
~
I'-
'<t
.lo::
Iii
0-
III
U;
0)
~
0-
0)
~
e:
B
'"
0)
$1
..-
'<t
Q)
CO
I
<Xl
<D
CO
..t
LO
Q)
<D
N
..-
CO
I
N
I'-
Q)
..t
LO
Q)
--1-
>- ~~
~ III III
~e:e>
k~~
Qj~":
~ ~'Q
E .~>-
1Il0~
~a:6
o
o
o
ci
Q)
M
e:
o
~
o
U;
0)
e::
c5
m
>
c::
~
CJ)
III
W
--.- --
0)
ro
e>
III
:2
..-
'<t
Q)
CO
I
<Xl
<D
CO
..t
LO
Q)
_ _ ---L
'"
~
III
(3
o
'"
:2
D/l
t: W g
~ g>~
Clc:t::::
~ III 0
......:26
Ill... _
e:0e:
~.~~
~a:l3
N
N
o
N
CO
..-,
..-
-0
c:::
U;
o
0-
I~
I~
III
-0
e::
.0
..::!
U
~
-0
-0
III
CI)
e:
o
U;
0)
$
m
01
III
e:
III
:2
~-5
.- III
~U.91
~O)......
f5:5!J!
Eoe:
0)~.!!1
I-- C 1..,.1
Q.!.l!!'Q
E'~~
~~3
'<t
o
o
N
U
0)
o
LO
LO
'<t
ai
I'-
..-
o
0)
'0'
a:
C
0)
E
0)
>
o
....
e.
E
u;
~
.c
t
o
Z
.c
o
III
0)
co
III
'c
III
o
o
o
<D
M
..t
N
Q)
I
'<t
LO
Q)
~
III
~
'"
....~
.... 3l~
1Ile:>-
~E 'c, E
e:~
.~ ~ fI>
I'-' 0'0
:t::0)
0'0'>-
kX a: s'
'<t
o
o
N
U
0)
o
<D
LO
o
ai
CO
0)
01
III
e:
'm
o
D/l
o
..J
01
e:
:S2
....
III
0-
'"
0)
:!!i
>-
e:
e:
~
CI)
Q)
Q)
I'-
<D
I
C;;
Q)
I
'<t
LO
Q)
e:
o
....~
.... 3l 'E
~ .!:~
~ Ol~
:i:lJj'o
:t:: >- >-
0) ~=.
Iiu'J
'<t '<t
o 0
o 0
N N
U U
0) 0)
o 0
1--1-- -.- -
..- Q)
I'- M
o CO
..- N
..- M
M CO
I'-
e::
CI)
D/l
uJ
.c
r::.
$
CI)
I
I'-
e::
CI)
D/l
en
-0
M
s:
CI)
----
e:
o
.~
~
e:
III
a::
N
CO
N
N
I
I'-
Q)
I'-
..t
LO
Q)
f5
III
- ~O)
~ III
e:....e:
~311ll
....e:
f 'c,~
O)Jj'o
01
.... ?;-~
~u6
-0
>
m
e:
-Cij
e:
<(
>
0)
CJ)
III
.c
0-
C:
..!J!
0-
m
u;
III
1:2
0)
:;
c
0)
>
III
e:
o
III
0)
(ij
-0
e:
..!J!
(ij
I
..-
N
<D
..-
I
I'-
LO
'<t
I
'<t
LO
Q)
..-
'<t
Q)
CO
cO
<D
CO
..t
LO
Q)
'"
~
III
(3
o
'"
~
~
cQig
0) Ollll
a,~rE
~~~
1Il~ '
e:Oe:
-0)-
QIIl.....O't-::IIl>
~a:u
'<t
o
o
N
U
0)
o
'<t
Q)
'<t
<D
M
OCI
e:
B
CJ)
0)
s
0)
(ij
-0
1m
-0
~
III
..J
it
~
~
m~
0)5
~'5~
ffiJj~
'lO~"'"
.:J~o
",.~~
- 0
~ .... .,
J 0- ....
'<t
o
o
N
n
o
'<t
o
o
N
n
o
LO
Q)
'<t
ai
LO
I'-
<D
'<t,
N
co
'"
c
0)
E
0)
>
o
a.
~
-0
o
o
.c
o
.0
'Qj
Z
0)
o
~
m
~
....
0)
>
c::
0)
U
-0
~
-- -
e:
o
~
01
.;::
....
D/l
01
e:
'0.
III
o
'"
-0
e:
III
..J
ai
o
.~
0)
CI)
m
ro
$
0)
Ij
,-
III
I
N
I'-
I'-
LO
I
<Xl
N
CO
I
'<t
LO
Q)
o
M
..-
'<t
I
I'-
I'-
I'-
I
'<t
LO
Q)
g
~ 0
,..;.cO)
\Joe.
,..;e:'"
......u:.!:
III e: .
.p;;.- -
C~j
00)
[::2::i
('I) ('I) N ~ ~
('I) Ll'l 0 ('I) ('I) 0 0
0 0 0 0 0 0 0 .- .- ..- 9
0 0 0 N
0 0 N N N N 0 <;> 0
N N ~ ~ 1.-- 13 6.
uf ~ C/) t> g
<..i ~ :J () () :::> ~ 0 0 dl
dl :J Ol W W 0.. C/)
Cl ..., :J Cl Cl W C)
<( C/) <(
.
0 0 0 0 ~ ~~ 0 0 co ~
0 <D .- 0 0
0 0 Ll'l 0 0 0 0 0 .- Ll'l
0 l"- I"- 0 0 0 0 0 .-- Ll'l
0 oj ro 0 Ll'l 0 .0 0 .- .0
0 I"- .- Ll'l ('1)- v_ Ol ~ ~ Ll'l Ll'l ('I)
Ll'l N N Ol <D ('I) ('I) .- ,..:.
..- .-
-~- i---
C/)
Cl l>- I>-
C/) <( ~ ~l <( <(
~ 0.. ~ ~
Z C)
W Cl Cl <D
tJ) Z <( 0
dl C ~ ~~ 0 <( <;>
Ol Ol" W Cl g~ 0::: 0 .- ~
> ....J Z
C Eo :E 0::: 0
C ro dlO 0 :::> z 0 <( ~
.:.:: -Q .c >.c 0::: r:c ....J J 0 Ll'l N I
'- 0 W N I
III iil '- 0'- 10.. <( 0 ()
0.. '- 0 w' i= C) C)
-~ dl 0..0 I~ I~ 0 0:::
C - c E~ C) () <( Z 0 W
:0 Cl <( :::> z N ~ ~
'0 III -ci 0::: ~ Cl <(
0.. (j) Oldl <( Z ....J
> OlZ 0 I~ ~~ ~ <( r:c 0::: I>-
Ol Ol ii5 ro_ o::: <( C/) Cl () <(
Ol COl ~~ Z "" ~ tu
(ij 0 ~j ~ ~~ ('I)
ro 3: '- ~ 0 "" ~ -- W ~
W 0 C/) ...... ~~ () 0 ~
C/) .0 0 Qj
!!2 E:!2 0 .- ....J <(
0.. >-
:c (; ....J Z C) .c C)
ti5 I C) () 0 z ii5
~ S2
:::> z c.. i= N
0 S2 () 0:::
C/) 0::: W <(
<( C/) 0..
0..
~ r--- - . ~ - -
~
Z W 0 a W W ~
0 ....J W Cl ....J
Ol <( ....J >6 I :::> W <(
~ i:L ~
~ ci C/) Cl ~ ::s ....J Cl 0::
C C W 0::: 0::: <( 0:::
0 .9 Ll'l g: " ~ W W ~ ~ Cl W
Ui tJ) ~ ~ Cl w Z Cl
Ol Ol ~ u.. Cl u.. <(
~ ~ .!!! 0 :::> u.. ~ "" ....J :::>
<( 0 ....J ::s
W" I>- ....J l:5 ~ <(
~- ~ ~ ~ ~ <( I ~
U u.. U i<l >- :E u..
, . r.J ~
U
.- .- 0 ..- v 0 ~ .- ('I) .- N :;:
V V Ll'l V V l"- I <D Ll'l I"-
Ol Ol 0 Ol 0 N .- N I"- ~
co co Ll'l co 0 v N <D ('I) Ll'l
ciJ ciJ ciJ ciJ M 2> ~ cD ciJ ciJ
<D <D N <D Ll'l co 0 I Ll'l N
co co co co N "'fl N v co
j; ..t- o ..t- o ~ ,;, ..t- ..t- ~
V Ll'l V ~
Ll'l Ll'l Ll'l 0 Ll'l 0 Ll'l Ll'l
Ol Ol Ol Ol ('I) Ol ('I) Ol Ol
I--- . --I- i--- 1-- 1- 1-- - f-- I--- -- . -1--1---
tJ) Ul U ) (3 (; ~
~ ~ ~ I~ l> iil ~
III ro <Ii :> w~- :J::: C ~ 1,1,1
u U w !!1 <..i ~ 'E ~~
0 0 ~ ~ {3g
Ul Ul U ~ 0..: :5 .~ a c[~
~ ~ 0 5 a,..: >- ro ()
~ (J) ~ I~~ C) ~ Ul E ro ~
b" b" '6 E (J) 'z Ol (!! 3: ,is I) ~
q; I::sw "
"'0 '-0 0 Qj~ ~ 00 ~ ~E III ~ I<i
~ Olc ~ Olc 0'- '-0 ~~ 0 ~
~-El ~~ >Ol ~ ,~~ ~ 5 ~ alia '- ....J ~~ """
F- lllm' ,~:J (jl~~ ~~
F- I- ~~ E Ol ()' W C ~
Ol C'- Ol C'- P Clc Ol CO C/) ~
~ ~6 ~ ~6 ~ lll~ 0::: ~ ~lG '-
-g~ ro z'-~ ~t~ Ol ~~I ,,-w
p Ol ~t ~Q -3~ ~ 00 E .!!! Cl
III OC: III - - Ot> ~ ro _C> ~ =-8 .L. 318 DC/) 0
C C Oc ~ ~o C o - ~c/)i-" ~ - ~~ '0
~ Ol- ~ Ol- EOl Ol ~ Ol~ ()O~ WI>- ~ ~'- 0 Iii >-w
'6'~ 'o~ ~ ~e :J 'oe ,~> :Et5 >- >-
~ ll:~ ~ ll:~ 8 ~ 0-, ~ () Ol >-'= ~~~ ~ ~ro " ~ """~ 5
lJ: ~CL ll:l5 '-q; C)~:E ro :3 5~
o..u
91
u
Q)
o
o
o
o
ai
00
<5~ ~
0) ~
:r:: >-
~I~I
I~~I
~~~I
z<( -
~WWg
~5!
~o
~ ~
~ ~
g ~
~
,I ~
,0 I-
,...J
IZ
>-1<(
~~
8~~
~i~ ~
1
I
~
~
~
~-
-
1- - -] --
W
Z
a:
W
:x::
o
e:::
co
:::2:
W
a.
r'
.....
~:;:
o~
~~
C:3~
~Q
en
:>
~~
W
~~
>--
1-<.9
t;~
..-
o
o
N
L{)
.-
co
W
u.
N
('f)
('f)
.-
00
<D
a.
:::2:
Z
~
o
W
:::2:
o
>
...J
co
W
Z
a.
.-
.-
L{)
<D
I
L{)
('f)
..,.
..t
L{)
0)
I'-
I'-
..,.
I~
I~
'0)
----- --
W
a.:
5~
~~
~>-I-
e:::
~o
>-&3
Sffi
I
o
o
o
N
U
W
o
I'-
('f)
I'-
0)-
I'-
<D
--
a.:
:::2:
o
<(
o
e:::
co
:::>
...J
u
W
...J
o
o
<(
en
Z
o
I-
en
W
s:
- ~
~I~~
>-11-
1-1>
t;O
<.9
Z
ii:
W
~1J
->-
,<.91-
;::~u
0)
0)
0)
.-
U
W
o
o
o
o
o
L{)
('f)
>
a.
:::2:
.-;
en
I-
u.
<(
I-
a.
:::2:
:x::
e:::
o
s:
o
<(
o
e:::
W
Z
a:
W
:x::
o
e:::
co
r51
a.
.-
.-
L{)
<D
J,
('f)
..,.
..t
L{)
0)
~I
.....
h:
ffi
?l
~
~
""
-
~
~
~
;;:
~
~
=
~
>
~
I
:x::
e:::
<(
a.
e:::
W
~I~
zlz
~IQ
1-1-
~I<(
~II-
~I~
~I
5:
QQ
;;c~
~~
~~
.....
.....
~
..,.
~
~
~
~
~
-
<.9
Z
ii:
hiW
~~
a
Z
W
U
i=
Z
~;::
g~
g
~
g
h:
ffi
~
~
E
~
:5
>-
S
>-
t:
[5
~
~
~
~
Cl
~~
~t
~~
~5
~
~
I-'-
~e
<(
~~~
~0~
~~
;:0
~e:::
Cl.
o
o
o
N
~
:::2:
o
o
o
o
..,.
L{)
W
U
e:::
W
:::2:
:::2:
o
U
u.
o
:x::
e:::
<(
Cl.
L{)
0)
L{)
..,.
00
o
0:
.-;
en
o
o
<D
('f)
6
I'-
N
..t
L{)
0)
i I-
:n ~
~~
_W
o
en
W
e:::
Cl.
o
o
o
N
L{)
W
Z
:::>
...,
M !
~~ ~
~~ ~
~; ~
o
o
o
o
.-
..,.
co
:::>
...J
u
I-
W
:::>
a
u
<(
e:::
>
a.
:::2:
:x::
...J
<(
s:
W
o
Ci5
od
o
<(
o
e:::
~~
S~
i~
~~
=
Z
o
I-
en
W
s:
~~
~
~
~
S
5~
3~
~s:
:5
~
::3
i ~
~ ~
o
00
..,.
('f)
N
0)
L{)
I
L{)
o
('f)
l" ill
~ ~
~ ~ i~
~~I ~I-
~ ~~I
y
:u
~
E
~~
><(
~~
~~
odod
~~
;>a.
~~
I-
>-
S
>-
t:
u
.-
.-
00
('f)
I
.-
('f)
0)
..t
L{)
O)z
~
~
:=
~~g
I-zJ
::;(31v
""'z -
iW~
I-~
UI-
w.
38
e:::~
a.i.L
o
o
o
N
L{)
W
Z
:::>
....,
o
o
o
ri
.-
.-
:x::
W
W
e:::
U
I-
:::>
z
o
U
o
U
~ ~
~ i
c-
i ~
e:::
W
I-
Z
W
U
W
u
~I~
~8
~~
~~
z
:::>
..,.
oow
0-
e:::~
'-;0
en
r::
..-
~
';-
~
'';
~
J..i
~
Ie:::
-W
~:x:: ~
-n<( I-
~~ffi~
ZW"'"
wz"'"'
~a~
<(Zn
ow=:.
EJCDC
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated as of the
CITY OF SUNNY ISLES BEACH
hereinafter called CONTRACTOR).
day of in the year 20_ by and between
(hereinafter called OWNER) and
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree as
follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The Work
is generally described as follows:
1. Construction of the Golden Shores Entrance Wall consisting of furnishing and installing an eight-
foot (8') high pre-cast concrete barrier wall to include coping and caps, and construction of +/- 920
linear feet of coping on existing barrier wall.
Article 2. ENGINEER.
The Project has been designed by:
CALVIN, GIORDANO & ASSOCIATES, INC.
1800 Eller Drive, Suite 600
Fort Lauderdale, Florida 33316
who is hereinafter called ENGINEER and who is to act as OWNER'S representative, assume all duties
and responsibilities and have the rights and authority assigned to ENGINEER in the Contract Documents
in connection with completion of the Work in accordance with the Contract Documents.
Article 3. CONTRACT TIMES.
3.1. The work will be substantially completed within 120 days after the date when the Contract
Times commence to run as provided in paragraph 2.3 of the General Conditions, and completed and
ready for final payment in accordance with paragraph 14.07 of the General Conditions within 150
days after the date when the Contract Times commence to run.
3.2. LIQUIDATED DAMAGES. OWNER and CONTRACTOR recognize that time is of the
essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed
within the times specified in paragraph 3.1 above, plus any extensions thereof allowed in
accordance with Article 12 of the General Conditions. They also recognize the delays, expense and
difficulties involved in proving the actual loss suffered by OWNER if the Work is not completed on
time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that
as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER Five
Hundred and 00/100 dollars ($500.00) for each day that expires after the time specified in
paragraph 3.1 for Substantial Completion until the Work is substantially complete. After Substantial
Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work within
the time specified in paragraph 3.1 for completion and readiness for final payment or any proper
extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Five Hundred
12/04
00500-1
04-4801
00/100 dollars ($500.00) for each day that expires after the time specified in paragraph 3.1 for
completion and readiness for final payment.
Article 4. CONTRACT PRICE.
OWNER shall pay CONTRACTOR for completion of the Work in accordance with the Contract
Documents an amount in current funds equal to the sum of the amounts detennined pursuant to paragraphs
4.1 and 4.2 below:
4.1. for all Work other than Unit Price Work, a Lump Sum of: N/A
($
)
figures
(use words)
All specific cash allowances are included in the above price and have been computed in accordance
with paragraph 11.02 of the General Conditions;
plus
4.2. for all Unit Price Work, an amount equal to the sum of the established unit price for each
separately identified item of Unit Price Work times the estimated quantity of that item as indicated
in this paragraph 4.2:
UNIT PRICE WORK
NO. ITEM
UNIT
ESTIMATED
QUANTITY
UNIT
PRICE
TOTAL
ESTIMATED
Refer to Exhibit "A" (-)
TOTAL OF ALL UNIT PRICES
$
As provided in paragraph 11.03 of the General Conditions estimated quantities are not guaranteed, and
detenninations of actual quantities and classification are to be made by ENGINEER as provided in
paragraph 9.08 of the General Conditions. Unit prices have been computed as provided in paragraph
11.03.B of the General Conditions.
Article 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Article 14 of the General
Conditions. Applications for Payment will be processed by ENGINEER as provided in the General
Conditions.
5.1. Progress Payments; Retainage. OWNER shall make progress payments on account of
the contract Price on the basis of CONTRACTOR's Applications for Payment as recommended by
ENGINEER, on or about the .l!ll... day of each month during construction as provided in
12/04
00500-2
04-4801
(
'J";
.'"
"
paragraphs 5.1.1. and 5.1.2. below. All such payments will be measured by the schedule of values
established in paragraph 2.07 of the General Conditions (and in the case of Unit Price Work based
on the number of units completed) or, in the event there is no schedule of values, as provided in the
General Requirements.
5.1.1. Prior to Substantial Completion, progress payments will be made in an amount
equal to the percentage indicated below, but, in each case, less the aggregate of payments
previously made and less such amounts as ENGINEER shall determine, or OWNER may
withhold, in accordance with paragraph 14.02 of the General Conditions.
...2!L % of Work completed (with the balance being retainage). If Work has been
50% completed as determined by ENGINEER, and if the character and progress
of the Work have been satisfactory to OWNER and ENGINEER, OWNER, on
recommendation of ENGINEER, may determine that as long as the character and
progress of the Work remain satisfactory to them, there will be no additional
retainage on account of Work completed, in which case the remaining progress
payments prior to Substantial Completion will be in an amount equal to 100% of
the Work completed.
~ % (with the balance being retainage) of materials and equipment not
incorporated in the Work (but delivered, suitably stored and accompanied by
documentation satisfactory to OWNER as provided in paragraph 14.02 of the
General Conditions and within Section 9-6.5 partial payments as provided in
FDOT Standard Specifications for Road and Bridge Construction.
5.1.2. When circumstances beyond the CONTRACTORS control arise (as determined
by the OWNER) the OWNER may allow the total payment to the CONTRACTOR to
increase to 98% of the contract price (with the balance being retain age), less such
amounts as ENGINEER shall determine, only after receipt of the final as-builts and upon
substantial completion of the project and in accordance with Paragraph 14.02 of the
General Conditions.
5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with
paragraph 14.07 of the General Conditions, OWNER shall pay the remainder of the Contract Price
as recommended by ENGINEER as provided in said paragraph 14.07.
Article 6. INTEREST. (Not Applicable)
Article 7. CONTRACTOR'S REPRESENTATIONS.
In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following
representations:
7.1. CONTRACTOR has examined and carefully studied the Contract Documents (including the
Addenda listed in paragraph 8) and the other related data identified in the Bidding Documents
including "technical data."
7.2. CONTRACTOR has visited the site and become familiar with and is satisfied as to the
general, local and site conditions that may affect cost, progress, performance or furnishing of the
Work.
12/04
00500-3
04-480 I
7.3. CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and
Regulations that may affect cost, progress, perfonnance and furnishing of the Work.
7.4. CONTRACTOR has carefully studied all reports of explorations and tests of subsurface
conditions at or contiguous to the site and all drawings of physical conditions in or relating to
existing surface or subsurface structures at or contiguous to the site (except Underground Facilities)
which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1. of the
General Conditions. CONTRACTOR accepts the detennination set forth in paragraph SC-4.2 of
the Supplementary Conditions of the extend of the "technical data" contained in such reports and
drawings upon which CONTRACTOR is entitled to rely as provided in paragraph 4.2 of the
General Conditions. CONTRACTOR acknowledges that such reports and drawings are not
Contract Documents and may not be complete for CONTRACTOR's purposes. CONTRACTOR
acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or
completeness of information and data shown or indicated in the Contract Documents with respect to
Underground Facilities at or contiguous to the site. CONTRACTOR has obtained and carefully
studied (or assumes responsibility for having done so) all such additional supplementary
examinations, investigations, explorations, tests, studies and data conceming conditions (surface,
subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect
cost, progress, perfonnance or furnishing of the Work or which relate to any aspect of the means,
methods, techniques, sequences and procedures of construction to be employed by
CONTRACTOR and safety precautions and programs incident thereto. CONTRACTOR does not
consider that any additional examinations, investigations, explorations, tests, studies or data are
necessary for the perfonnance and furnishing of the Work at the contract Price, within the Contract
Times and in accordance with the other tenns and conditions of the Contract Documents.
7.5. CONTRACTOR is aware of the general nature of work to be performed by OWNER and
others at the site that relates to the Work as indicated in the Contract Documents.
7.6. CONTRACTOR has correlated the information known to CONTRACTOR, information and
observations obtained from visits to the site, reports and drawings identified in the Contract
Documents and all additional examinations, investigations, explorations, tests, studies and data with
the Contract Documents.
7.7. CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or
discrepancies that CONTRACTOR has discovered in the Contract Documents and the written
resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract Documents
are generally sufficient to indicate and convey understanding of all terms and conditions for
perfonnance and furnishing of the Work.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and CONTRACTOR
concerning the Work consist of the following:
8.1. This Agreement (pages 1 tolQ. inclusive).
8.2.
Exhibits to this Agreement (page)
inclusive ).
12/04
00500-4
04-4801
8.3. Performance, Payment, and other Bonds, identified as exhibits 00600 and 0060 I and
consisting of -1... pages.
8.4. Notice to Proceed.
8.5. General Conditions (pages ...L to 42 , inclusive).
8.6. Supplementary Conditions (pages 0800-1 to 00800-7 , inclusive).
8.7.
Specifications bearing the title Golden Shores Entrance Wall
consisting of -1.. divisions, as listed in Table of Contents thereof.
and
8.8. Drawings consisting of a cover sheet and sheets numbered C 1 through C2, inclusive with
each sheet bearing the following general title: SEE ARTICLE 9
8.9.
Addenda
, inclusive.
8.10. CONTRACTOR's Bid (pages 00300-1 through 00300-2 and Exhibit A, inclusive).
8.11. Documentation submitted by CONTRACTOR prior to Notice of Award (pages N/A to
_ inclusive).
8.12. The following which may be delivered or issued after the Effective Date of the Agreement
and are not attached hereto: All Written Amendments and other documents amending, modifying or
supplementing the Contract Documents pursuant to paragraph 3.04 of the General Conditions.
The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement (except as expressly
noted otherwise above).
There are no Contract Documents other than those listed above in this Article 13. The Contract
Documents may only be amended, modified or supplemented as provided in paragraph 3.04 of the General
Conditions.
Article 9. MISCELLANEOUS.
9.1. Terms used in this Agreement which are defined in Article 1 of the General Conditions
will have the meanings indicated in the General Conditions.
9.2. No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party thereto without the written consent of the
party sought to be bound; and, specifically but without limitation, moneys that may
become due and moneys that are due may not be assigned without such consent (except to
the extent that the effect of this restriction may be limited by law), and unless specifically
stated to the contrary in any written consent to an assignment no assignment will release or
discharge the assignor from any duty or responsibility under the Contract Documents.
9.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect to all covenants, agreements and obligations contained in the Contract
Documents.
] 2/04
00500-5
04-480]
9.4. Any provisions or part of the Contract Documents held to be void or unenforceable under
any Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be
valid and binding upon OWNER and CONTRACTOR, who agree that the Contract Documents
shall be reformed to replace such stricken provisions or part thereof with a valid and enforceable
provision that comes as close as possible to expressing the intention of the stricken provision.
9.5. OTHER PROVISIONS.
9.5.1. DRAWINGS
Golden Shores Entrance Wall
(CGA Project No. 04-4801)
DESCRIPTION
Cover Sheet
Barrier Wall Site Plan
Barrier Wall Details
SHEET NO.
Cl
C2
9.5.2. The CONTRACTOR agrees to indemnify and save harmless the CITY OF SUNNY
ISLES BEACH, AND CALVIN GIORDANO & ASSOCIATES, INC., Civil Engineers-
Planners-Surveyors, their agents and employees, from or on account of any injuries or damages
received or sustained by any person or person during or on account of any operations connected with
the construction of these roadway improvements; or by or in consequence of any negligence in
connection with the same; or by use of any improper materials or by or on account of any act or
omission of the said Contractor, subcontractor, agents, servants, or employees; and
9.5.3. The CONTRACTOR agrees to maintain in force at all times during the life of the
construction, public liability insurance, by separate certificate, in an amount not less than $1,000,000
for injuries, including willful death, to anyone person and subject to those same limits for each
person, in an amount not less that $1,000,000 for damages as a result of each occurrence and
property damage insurance and in an amount not less than $1,000,000 for damages on anyone
occurrence. Such policy shall specifically protect the CITY OF SUNNY ISLES BEACH, AND
CALVIN, GIORDANO & ASSOCIATES, INC., Civil Engineers-Planners-Surveyors, their
agents and employees, by making them an additional insured, and shall not be modified or canceled
without thirty (30) days written notice to the CITY OF SUNNY ISLES BEACH.
9.5.4 Should the final completion and acceptance of the work herein embraced together with
any modification or additions be delayed beyond the time herein set because of lace of performance
by the Contract, it is understood and agreed that aside from any other liquidated damage per day for
such delay from such time until the work is completed and accepted as herein provided, all costs of
engineering and inspection on behalf of the Owner will be charged to the contractor and deducted
from any estimate or payment otherwise due and payable to him from time to time. The costs of
engineering and inspection which may be charged to the Contractor by the Owner under this article
shall be equal to the Engineer's charges to the Owner.
12/04
00500-6
04-4801
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in Five (5)
parts. One counterpart each has been delivered to OWNER, CONTRACTOR and ENGINEER. All
portions of the Contract Documents have been signed, initialed or identified by OWNER and
CONTRACTOR or identified by ENGINEER on their behalf.
This Agreement will be effective on
,20_ (which is the Effective Date of the Agreement).
ATTEST:
By
[CORPORATE SEAL]
[CORPORATE SEAL]
Address for giving notices
License No.
Agent for service of process
(If CONTRACTOR is a corporation,
attached
evidence of authority to sign).
12/04
00500-7
04-4801
SIGNATURE PAGE FOR CONTRACTS/AGREEMENTS
CITY EXECUTIONS
IN WITNESS WHEREOF, the parties hereto have made and executed this (Agreement or
Contract) on the respective dates under each signature: City of Sunny Isles Beach through its City
Commission, signing by and through its Mayor, authorized to execute same by Commission action on the
_ day of , _; and CONTRACTOR authorized to execute same.
CITY OF SUNNY ISLES BEACH, through its
City Commission
ATTEST:
By:
Norman S. Ede\cup, Mayor
_day of
,20--
Jane Hines, City Clerk
Approved as to form and legality by
Office of the City Attorney
By:
Christopher J. Russo, City Manager
_day of
,20--
By:
Lynn M. Dannheisser, City Attorney
_day of
,20--
(CITY SEAL)
12/04
00500-8
04-480 I
II......
.,
-:
I
This document has important legal consequences; consultation with an attorney is encouraged with respect to its use or
modification. This document should be adapted to the particular circumstances of the contemplated Project and the
Controlling Law.
STANDARD
GENERAL CONDITIONS
OF THE
CONSTRUCTION CONTRACT
Prepared by
ENGINEERS JOINT CONTRACT DOCUMENTS COMMITfEE
and
J~
Issued and Published Jointly By
fj National Society of
Professional Engineers
Professional Engineers In Private Practice
4SCE
AMERICAN SOCIETY OF
CIVil ENGINEERS
AMERICAN CONSULTING
ENGINEERS COUNCI L
PROFESSIONAL ENGINEERS IN PRIV ATE PRACTICE
a practice division of the
NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS
AMERICAN CONSULTING ENGINEERS COUNCIL
AMERICAN SOCIETY OF CIVIL ENGINEERS
This document has been approved and endorsed by
The Associated General ~ Contractors of America.
~
Construction Specifications Institute
~~
These General Conditions have been prepared for use with the Owner-Contractor Agreements (No. 1910-8-A-lor 1910-
8-A-2) (1996 Editions). Their provisions are interrelated and a change in one may neCessitate a change in the other.
Comments concerning their usage are contained in the EJCDC User's Guide (No. 1910-50). For guidance in the
preparation of Supplementary Conditions, see Guide to the Preparation of Supplementary Conditions (No. 1910-17)
(1996 Edition). ,.
EJCDC No. 1910-8 (1996 Edition)
~~ '
fl.'
"
I
I
I
TABLE OF CONTENTS
~
ARTICLE I - DEFINITIONS AND TERMINOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 6
1.01 Defined Terms ................................................. - . 00700 - 6
1.02 Terminology. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 8
ARTICLE 2 - PRELIMINARY MA TIERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 9
2.01 Delivery of Bonds ................................................. 00700 - 9
2.02 Copies of DocumenJs ....................................... - . . . . . . . 00700 - 9
2.03 Conunencemell1 of ConJract Times; Notice to Proceed .......................... 00700 - 9
2.04 Staning the Work ................................. - . . . . . . . . . . . . . . . 00700 - 9
2.05 Before Staning Construction .............................. - . . . . . . . . . . . 00700 - 9
2.06 Preconstruction Conference . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 10
2.07 Initial Acceptance of Schedules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 10
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE .................... 00700 - 10
3.01 InJenJ. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 10
3.02 Reference Standards .............................................. 00700 - 10
3.03 Reporting and Resolving Discrepancies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 11
3.04 Amending and Supplemenling COnJract DocumenJs ........................... 00700 - 11
3.05 Reuse of Documenls . . . . . . . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 11
ARTICLE 4 - A V AILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS .............................................. 00700 - 11
4.01 Availability of Lands .............................................. 00700 - 11
4.02 Subsurface and Physical Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 12
4.03 Differing Subsurface or Physical Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 12
4.04 Underground Facilities . . . . . . . . . . . . . _ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 13
4.05 Reference PoinJs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 13
4.06 Hazardous Environmell1al Condition at Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 14
ARTICLE 5 - BONDS AND INSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 15
5.01 Performance. Paymenl, and Other Bonds ................................. 00700 - 15
5.02 Licensed Sureties and Insurers ....................................... . 00700 - 15
5.03 Certificates of Insurance ............................................ 00700 - 15
5.04 CONI'RACl'OR's Liability Insurance .......... . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 15
5.05 OWNER's Liability Insurance. . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 16
5.06 Property Insurance ............................................... 00700 - 16
5.07 Waiver of Rights ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 17
5.08 Receipt and Application of Insurance Procuds . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 18
5.09 Acceptance of Bonds and Insurance; Option to Replace ........................ 00700 - 18
5.10 Partial Utilization, Ackrwwledgmenl of Property Insurer. . . . . . . . . . . . . . . . . . . . . . . . 00700 - 18
ARTICLE 6 - CONTRACTOR'S RESPONSmILmES ................................... 00700 - 18
6.01 Supervision and Superinlendence . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ... . . . :-. . . . 00700 - 18
6.02 Labor; Working Hours ............................................. 00700 - 19
6.03 Services, Materials, and EquipmenJ . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 19
6.04 Progress Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 19
6.05 Substitutes and "Or-Equals" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 19
6.06 Concerning Subconlractors, Suppliers, and Others. . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 20
6.07 Patenl Fees and Royalties ........................................... 00700 - 21
6.08 Permits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 21
6.09 Laws and Regulations. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . 00700 - 22
6.10 Taxes. . . . . . . . . . . . . . . . . . . . . . . . . . . '. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 22
6.11 Use of Site and Other .Areas . . . . . . . . . . . . . : . . . . . . . . . . . . . : . . . . . . . . . . . . . . 00700 - 22
r
6.12 Record Documenls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 22
6.13 Safety and Protection ........................... . . . . . . . . . . . . . . . . . . . 00700 - 23
6.14 Safety RepresenJative ............................................... 00700 - 23
6.15 Hazard Communication Programs . . . . . . . . . . . ',' . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 23
00700 - 3
~]v
.
\',
I
I
I
TABLE OF CONTENTS
~
ARTICLE I - DEFINITIONS AND TERMINOLOGY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 6
1.01 Defined Terms ................................................... 00700 - 6
1.02 Terminology . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 8
ARTICLE 2 - PRELIMINARY MA TIERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 9
2.01 Delivery of Bonds ................................................. 00700 - 9
2.02 Copies of DocumenJs ............................................... 00700 - 9
2.03 Commencemen/ of COn/ract Times; Notice to Proceed .......................... 00700 - 9
2.04 Starting the Work ................................................. 00700 - 9
2.05 Before Starting Construction .......................................... 00700 - 9
2.06 Preconstruction Conference .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 10
2.07 Initial Acceptance of Schedules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 10
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE .................... 00700 - 10
3.01 In/enJ. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 10
3.02 Reference StandLJ.rds .............................................. 00700 - 10
3.03 Reporting and Resolving Discrepancies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 11
3.04 Amending and SupplemenJing COnlract DocumenJs ........................... 00700 - II
3.05 Reuse of DocumenJs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 11
ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS .............................................. 00700 - 11
4.01 Availability of Lands .............................................. 00700 - 11
4.02 Subsurface and Physical Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 12
4.03 Differing Subsurface or Physical Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 12
4.04 Underground Facilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 13
4.05 Reference PoinlS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 13
4.06 Hazardous Environmenlal Condition aJ Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 14
ARTICLE 5 - BONDS AND INSURANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 15
5.01 Performance. PaymenJ, and Other Bonds ................................. 00700 - IS
5.02 Licensed Sureties and Insurers ........................................ 00700 - IS
5.03 Certificates of Insuram:e '" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 15
5.04 CONTRACTOR's Liability Insurance .................................... 00700 - 15
5.05 OWNER's Liability Insuraru:e . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 16
5.06 Property Insurance ............................................... 00700 - 16
5.07 Waiver of Rights . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 17
5.08 Receipt and Application of Insurance Proceeds. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 18
5.09 Acceptance of Bonds and Insurance,' Option to Replace ........................ 00700 - 18
5.10 Partial Utilization. Acknowledgment of Property Insurer . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 18
ARTICLE 6 - CONTRACTOR'S RESPONSffiILmES ................................... 00700 - 18
6.01 Supervision and Superintendence. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .., . . . .-. . . . 00700 - 18
6.02 Labor; Working Hours ............................................. 00700 - 19
6.03 Services, MaJerials, and Equipment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 19
6.04 Progress Schedule .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 19
6.05 Substitutes and "Or-Equals" . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 19
6.06 Concerning Subcontractors, Suppliers, and Others. . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 20
6.07 Patent Fees and Royalties ........................................... 00700 - 21
6.08 Permits. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 21
6.09 Laws and Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ". . . . . . . . . . . . . . 00700 - 22
6.10 Taxes. . . . . . . . . . . . . . . . . . . . . . . . . . . -. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 22
6.11 Uu of Site and Other Areas . . . . . . . . . . . . . : . . . . . . . . . . . . . : . . . . . . . . . . . . . . 00700 - 22
,.
6.12 Record DocumenJs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 22
6.13 Safety and Protection ............................................. . 00700 - 23
6.14 Safety Representative ............................................... 00700 - 23
6.15 Hazard Communication Programs . . . . . . . . . . . ',' . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 23
00700 - 3
~l.'
~,~,
{l
.
I
I
I
6.16 Emergencies. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 00700 - 23
6.17 Shop Drawings and Samples. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 23
6. I 8 Conrinuing the Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 24
6.19 CONTRACTOR's General Warranty and Guaranlee . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 25
6.20 IndemnificaJion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 25
ARTICLE 7 - OTHER WORK .............................................. . . . . . 00700 - 26
7.01 Related Work aJ Site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 26
7.02 Coordinarion. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 26
ARTICLE 8 - OWNER'S RESPONSIBILITIES ........................................ 00700 - 26
8.01 CommunicaJions to Conrractor .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 26
8.02 ReplacemenJ of ENGINEER. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 26
8.03 Furnish DaJa ................................................... 00700 - 26
8.04 Pay Promptly \.Vhen Due . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 26
8.05 Lands and Easemenrs; Reports and Tests. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 26
8.06 Insurance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 27
8.07 Change Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 27
8.08 Inspections, Tests. and Approvals ...................................... 00700 - 27
8.09 LimitaJions on OWNER's Responsibilities ................................. 00700 - 27
8.10 Undisclosed Ha:?ardous Environmental Condition ............................ 00700 - 27
8. I I Evidence of Financial Arrangemenrs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . , . . . . . . . 00700 - 27
ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 27
9.01 OWNER'S Represenrative ........................................... 00700 - 27
9.02 Visits to Site. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 27
9.03 Project Represenrative ............................................. 00700 - 27
9.04 ClarificaJions and InrerpretaJions ...................................... 00700 - 28
9.05 Authorized Variations in Work ........................................ 00700 - 28
9.06 Rejecting Defective Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 28
9.07 Shop Drawings, Change Orders and Paymenrs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 28
9.08 Detenninarions for Unit Price Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 28
9.09 Decisions on Requiremenrs of Contract Documenrs and Acceptability of Work .......... 00700 - 28
9.10 LimitaJions on ENGINEER's Authority and Responsibilities. . . . . . . . . . . . . . . . . . . . . . 00700 - 28
ARTICLE 10 - CHANGES IN THE WORK; CLAIMS ................................... 00700 - 29
10.01 Authorized Changes in the Work ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 29
10.02 Unauthorized Ozanges in the Work ..................................... 00700 - 29
10.03 Execution of Change Orders. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 29
10.04 Notification to Surety .......................................... ''c' . . 00700 - 29
10.05 Ooirns and Disputes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 30
ARTICLE 11 - COST OF 11IE WORK; CASH ALLOWANCES; UNIT PRICE WORK . . . . . . . . . . . . . . 00700 - 30
11.0 I Cost of the Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 30
11.02 OIsh Allowaru:es . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 32
11.03 Unit Price Work ................................................. 00700 - 32
ARTICLE 12 - CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIMES ............. 00700 - 33
12.01 Change of Conrract Price ........................................... 00700 - 33
12.02 Change of Conrract TImes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 33
12.03 Delays Beyond CONTRACTOR's Conrrol ................................. 00700 - 33
12.04 Delays Within CONTRACTOR's Conrrol . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 34
12.05 Delays Beyond OWNER's and CONTRACTOR's Conrrol . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 34
12.06 Delay Damages. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 34
ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 34
13.0 I Notice of Defects ...~..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 34
13.02 Access to Work . . . . . . . . . . . . . . . . . . . . . .,. . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 34
13.03 Tests and Inspections .............................................. 00700 - 34
13.04 Uncovering Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 3S
13.05 OWNER May Stop the Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 3S
13.06 Correction or Removal of Defective Work ............................... . . 00700 - 3S
00700 - 4
I
~.
.
A
13.07 Correction Period .......................................... . . . . . . 0070Q - 35
13.08 Acceptance of Defective Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0070Q - 36
13.09 OWNER May Correct Defective Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 36
ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION. . . . . . . . . . . . . . . . . . . . . . . . 00700 - 36
14.01 Schedule of Values. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 36
14.02~ Progress Payments. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 37
14.03 CONTRACTOR's Warranty of TItle .......................... . . . . . . . . . . . 00700 - 38
14.04 Substanlial Completion ............. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 38
14.05 Panial UtiliZalion ................................................ 00700 - 39
14.06 Final Inspection ................................................. 00700 - 39
14.07 Final Payment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 39
14.08 Final Completion Delayed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 40
14.09 Waiver of Claims. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 40
ARTICLE 15 - SUSPENSION OF WORK AND TERMINATION ............................ 00700 - 40
15.01 OWNER May Suspend Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 40
15.02 OWNER May TenninaIefor Cause. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 40
15.03 OWNER May TenninaIe For Convenience. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. 00700 - 41
15.04 CONTRACTOR May Stop Work or TenninaIe . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 41
ARTICLE 16 - DISPUTE RESOLUTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 41
16.01 Methods and Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 41
ARTICLE 17 - MISCELLANEOUS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 42
17.01 Giving Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 42
17.02 Computalion of Times . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 42
17.03 Cumulative Remedies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 42
17.04 Survival of Obligations .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 00700 - 42
17.05 Controlling Law ................................................. 00700 - 42
,.
00700 - 5
GENERAL CONDITIONS
ARTICLE 1 - DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in the Contract Documents and
printed with initial or all capitaJ letters, the terms listed
below will have the meanings indicated which are applicable
to both the singular and plural thereof.
1. Addenda--Written or graphic instruments issued
prior to the opening of Bids which clarify, correct, or
change the Bidding Requirements or the Contract
Documents .
2. Agreement-The written instrument which is
evidence of the agreement between OWNER and
CONTRACTOR covering the Work.
3. Applicationfor Payment-The form acceptable to
ENGINEER which is to be used by CONTRACTOR
during the course of the Work in requesting progress or
fmal payments and which is to be accompanied by such
supporting documentation as is required by the Contract
Documents .
4. Asbestos--Any material that contains more than
one percent asbestos and is friable or is releasing asbestos
fibers into the air above current action levels established
by the United States Occupational Safety and Health
Administration.
s. Bid-The offer or proposal of a bidder submitted
on the prescribed form setting forth the prices for the
Work to be performed.
6. Bidding Documents-The Bidding Requirements
and the proposed Contract Documents (including all
Addenda issued prior to receipt of Bids).
7. Bidding Requirements-- The Advertisement or
Invitation to Bid, Instructions to Bidders, Bid security
form, if any, and the Bid form with any supplements.
8. Bonds-Performance and payment bonds and
other instruments of security.
9. Oumge Order-A document recommended by
ENGINEER which is signed by CONTRACTOR and
OWNER and authorizes an addition, deletion, or revision
in the Work or an adjustment in the Contract Price or the
00700 - 6
Contract Times, issued on or after the Effective Date 01
the Agreement.
10. Claim--A demand or assertion by OWNER or
CONTRACTOR seeking an adjustment of Contract Price
or Contract Times, or both, or other relief with respect to
the terms of the Contract. A demand for money or
services by a third party is not a Claim.
11. Contract-- The entire and integrated written
agreement between the OWNER and CONTRACTOR
concerning the Work. The Contract supersedes prior
negotiations, representations, or agreements, whether
written or oral.
12. Contract Documents--The Contract Documents
establish the rights and obligations of the parties and
include the Agreement, Addenda (which pertain to the
Contract Documents). CONTRACTOR's Bid (including
documentation accompanying the Bid and any post Bid
documentation submitted prior to the Notice of Award)
when attached as an exhibit to the Agreement, the Notice
to Proceed, the Bonds, these General Conditions, the
Supplementary Conditions, the Specifications and the
Drawings as the same are more specifically identified in
the Agreement, together with all Written Amendments,
Change Orders, Work Change Directives, Field Orders,
and ENGINEER's written interpretations and
clarifications issued on or after the Effective Date of the
Agreement. Approved Shop Drawings and the reports
and drawings of subsurface and physical conditions are
not Contract Documents. Only printed or hard copies of
the items listed in this paragraph are.Contract Documents.
Files in electronic media format of text, data, graphics,
and the like that may be furnished by OWNER to
CONTRACTOR are not Contract Documents.
13. Contract Price-The moneys payable by OWNER
to CONTRACTOR for completion of the Work in
accordance with the Contract Documents as stated in the
Agreement (subject to the provisions of paragraph 11.03
in the case of Unit Price Work).
14. Centrad Tunes-The number of days or the dates
stated in the Agreement to: (i) achieve Substantial
Completion; and (ii) complete the Work so that it is ready
for final payment as evidenced by ENGINEER's written
,.recommendation of final payment.
15. CONTRACTOR-The individual or entity with
whom OWNER has entered into the Agreement.
16. Cost of the Work--See paragraph 11.01.A for
definition.
17 . Drawings-That part of the Contract Documents
prepared or approved by ENGINEER which graphically
shows the scope, extent, and character of the Work to be
performed by CONTRACTOR. Shop Drawings and
other CONTRACTOR submittals are not Drawings as so
defined .
18. Effective Dale oj the AgreemenJ--The date
indicated in the Agreement on which it becomes effective,
but if no such date is indicated, it means the date on
which the Agreement is signed and delivered by the last
of the two parties to sign and deliver.
19. ENGINEER--The individual or entity named as
such in the Agreement.
20. ENGINEER's Consultant-An individual or entity
having a contract with ENGINEER to furnish services as
ENGINEER's independent professional associate or
consultant with respect to the Project and who is
identified as such in the Supplementary Conditions.
21. Field Order--A written order issued by ENGI-
NEER which requires minor changes in the Work but
which does not involve a change in the Contract Price or
the Contract Times.
22. General RequiremenJs-Sections of Division 1 of
the Specifications. The General Requirements pertain to
all sections of the Specifications.
23. Haz.ardcus Environmental Condition-The
presence at the Site of Asbestos, PCBs, Petroleum,
Hazardous Wasu:, or Radioactive Material in such
quantities or circumstances that may present a substantial
danger to persons or property exposed thereto in
connection with the Worle.
24. Haz.ardous Waste-The term Hazardous Waste
shall have the meaning provided in Section 1004 of the
Solid Waste Disposal Act (42 USC Section 6903) as
amended from time to time.
25. Laws and Regulations; Laws or Regulations-Any
and all applicable laws, roles, regulations. ordinances,
codes, and orders of any and all governmental bodies,
agencies, authorities, and courts having jurisdiction.
26. Uens-Charges, security interests, or
encumbrances upon Project funds, real property, or
person.al property.
27. Milestone--A principal event specified in the
Contract Documents relating to an intermediate comple-
tion date or time prior to Substantial Completion of all the
Work.
28. Notice oj Award--The written notice by OWNER
to the apparent successful bidder stating that upon timely
compliance by the apparent successful bidder with the
conditions precedent listed therein, OWNER will sign and
deliver the Agreement.
29. Notice to Proceed--A written notice given by
OWNER to CONTRACTOR fixing the date on which the
Contract Times will commence to run and on which
CONTRACTOR shall start to perform the Work under
the Contract Documents.
30. OWNER-The individual, entity, public body, or
authority with whom CONTRACTOR has entered into
the Agreement and for whom the Work is to be
perfonned.
31. Partial UtilizaJion--Use by OWNER of a substan-
tially completed part of the Work for the purpose for
which it is intended (or a related purpose) prior to
Substantial Completion of all the Work.
32. PCBs--PolycWorinated biphenyls.
33. Petroleum-Petroleum, including crude oil or any
fraction thereof which is liquid at standard conditions of
temperature and pressure (60 degrees Fahrenheit and 14.7
pounds per square inch absolute), such as oil. petroleum.
fuel oil. oil sludge. oil refuse, gasoline. kerosene, and oil
mixed with other non-Hazardous Waste and crude oils.
34. Project-The total construction of which the
Work to be performed under the Contract Documents
may be the whole, or a part as may be indicated
elsewhere in the Contract Documents.
35. Project Manual-The bOund documentary
information prepared for bidding and constructing the
Work. A listing of the contents of the Project Manual,
which may be bound in one or more volumes, is
contained in the table(s) of contents.
36. Radioactive Material-Source, special nuclear, or
byproduct material as .dermed by the Atomic Energy Act
of 1954 (42 USC Section 2011 et seq.) as amended from
time to time.
,.
37. Resident Project RepresenJative- The authorized
representative of ENGINEER whQ may be assigned to the
Site or any part thereof.
00700 - 7
.
-
II
,
I'
I
38. Samples-Physical examples of materials,
equipment, or workmanship that are representative of
some portion of the Work and which establish the
standards by which such portion of the Work will be
judged.
39. Shop Drawings-All drawings, diagrams, illustra-
tions, schedules, and other data or information which are
specifically prepared or assembled by or for CON-
TRACTOR and submitted by CONTRACTOR to
illustrate some portion of the Work.
40. Site--Lands or areas indicated in the Contract
Documents as being furnished by OWNER upon which
the Work is to be performed, including rights-of-way and
easements for access thereto, and such other lands
furnished by OWNER which are designated for the use of
CONTRACTOR.
41. Specificarions-- That part of the Contract
Documents consisting of written technical descriptions of
materials, equipment, systems, standards, and
workmanship as applied to the Work and certain
administrative details applicable thereto.
42. SubconJractor--An individual or entity having a
direct contract with CONTRACTOR or with any other
Subcontractor for the performance of a part of the Work
at the Site.
43. Substantial Completion-The time at which the
Work (or a specified part thereof) has progressed to the
point where, in the opinion of ENGINEER. the Work (or
a specified part thereof) is sufficiently complete, in
accordance with the Contract Documents, so that the
Wode (or a specified part thereof) can be utilized for the
purposes for which it is intended. The terms
..sub-<:t~nti~lIy complete" and "'substantially completed" as
applied to all or part of the Work refer to Substantial
Completion thereof.
44. SupplemenJary Conditions-- That part of the
Contract Documents which amends or supplements these
General Conditions.
45. Supplier-A manufacturer, fabricator, supplier,
distributor, materialman, or vendor having a direct
contract with CONTRACfOR or with any Subcontractor
to furnish materials or equipment to be incorporated in
the Work by CONTRACTOR or any Subcontractor.
40. Underground Facilities-All underground
pipelines, conduits, ducts, cables, wires, manholes,
vaults, tanks, tunnels, or other such facilities or
attachments, and any encasements containing such
facilities, including those that convey electricity, gases,
00700 - 8
steam, liquid petroleum products, telephone or other
communications, cable television, water, wastewater,
storm water, other liquids or chemicals, or traffic or
other control systems.
47. Unit Price WorknWork to be paid for on the
basis of unit prices.
48. Work--The entire completed construction or the
various separately identifiable parts thereof required to be
provided under the Contract Documents. Work includes
and is the result of performing or providing all labor,
services, and documentation necessary to produce such
construction, and furnishing, installing, and incorporating
all materials and equipment into such construction, all as
required by the Contract Documents.
49. Work Ozange Directive-A written statement to
CONTRACTOR issued on or after the Effective Date of
the Agreement and signed by OWNER and recommended
by ENGINEER ordering an addition, deletion, or revision
in the Work, or responding to differing or unforeseen
subsurface or physical conditions under which the Work
is to be performed or to emergencies. A Work Change
Directive will not change the Contract Price or the
Contract Times but is evidence that the parties expect that
the change ordered or documented by a Work Change
Directive will be incorporated in a subsequently issued
Change Order following negotiations by the parties as to
its effect, if any, on the Contract Price or Contract
Times.
50. Written AmendmenJ-A written statement
modifying the Contract Documents, signed by OWNER
and CONTRACfOR on or after the Effective Date of the
Agreement and normally dealing with the nonengineering
or nontechnical rather than strictly construction-related
aspects of the Contract Documents.
1.02 TenninoIogy
A. InJent of Certain Terms or Adjectives
1. Whenever in the Contract Documents the terms
"as allowed," "as approved," or terms of like effect or
import are used, or the adjectives "reasonable, "
"suitable," "acceptable," "proper," "satisfactory," or
adjectives of like effect or import are used to describe an
action or determination of ENGINEER as to the Work, it
is intended that such action or determination will be solely
to evaluate, in general, the completed Work for
crompliance with the requirements of and information in
the Contract Documents and conformance with the design
concept of the completed Project as a functioning whole
as shown or indicated in the Contract Documents (unless
there is a specific statement indicating otherwise). The
I
I \
I
I
I
I
I
I
I
I
I
I:
I
I
I:
Ii
II
II
II
use of any such term or adjective shall not be effective to
assign to ENGINEER any duty or authority to supervise
or direct the performance of the Work or any duty or
authority to undertake responsibility contrary to the
provisions of paragraph 9.10 or any other provision of the
Contract Documents.
B. Day
1. The word "day" shall constitute a calendar day
of 24 hours measured from midnight to the next midnight.
C. Defective
1. The word "defective," when modifying the word
"Work," refers to Work that is unsatisfactory, faulty, or
deficient in that it does not conform to the Contract
Documents or does not meet the requirements of any
inspection, reference standard, test, or approval referred
to in the Contract Documents, or has been damaged prior
to ENGINEER's recommendation of final payment
(unless responsibility for the protection thereof has been
assumed by OWNER at Substantial Completion in accor-
dance with paragraph 14.04 or 14.05).
D. Furnish, Install. Perfonn. Provide
1. The word "furnish," when used in connection
with services, materials, or equipment, shall mean to
supply and deliver said services, materials, or equipment
to the Site (or some other specified location) ready for use
or installation and in usable or operable condition.
2. The word "install," when used in connection
with services, materials, or equipment. shall mean to put
into use or place in final position said services, materials,
or equipment complete and ready for intended use.
3. The words "perform" or "provide," when used
in connection with services, materials, or equipment,
shall mean to furnish and install said services, materials,
or equipment complete and ready for intended use.
4. When "furnish," "install," "perform," or "pro-
vide" is not used in connection with services, materials,
or equipment in a context clearly requiring an obligation
of CONTRACTOR, "provide" is implied.
E. Unless stated otherwise in the Contract Documents,
words or phrases which have a well-known technical or
constroction industry or trade meaning are used in the
Contract Documents in accordance with such recognized
meaning.
ARTICLE 2 - PRELIMINARY MA TIERS
2.01 Delivery of Bonds
A. When CONTRACTOR delivers the executed
Agreements to OWNER, CONTRACTOR shall also deliver
to OWNER such Bonds as CONTRACTOR may be required
to furnish.
2.02 Copies of Documen/s
A. OWNER shall furnish to CONTRACTOR up to ten
copies of the Contract Docwnents. Additional copies will be
furnished upon request at the cost of reproduction.
2.03 Commencement of Contract Times; Notice to Proceed
A. The Contract Times will commence to run on the
thirtieth day after the Effective Date of the Agreement or, if
a Notice to Proceed is given, on the day indicated in the
Notice to Proceed. A Notice to Proceed may be given at any
time within 30 days after the Effective Date of the
Agreement. In no event will the Contract Times commence
to run later than the sixtieth day after the day of Bid opening
or the thirtieth day after the Effective Date of the Agreement,
whichever date is earlier.
2.04 Starting the Work
A. CONTRACTOR shall start to perform the Work on
the date when the Contract Times commence to run. No
Work shall be done at the Site prior to the date on which the
Contract Times commence to run.
2;05 Before Starting Consl1Uction
A. CONTRACTOR's Review of Contract Documents:
Before undertaking each part of the Work. CONTRACTOR
shall carefully study and 'compare the Contract Documents
and check and verify pertinent figures therein and all
applicable field measurements.' COf'ITRACTOR shall
promptly report in writing to ENGINEER any conflict, error,
ambiguity, or discrepancy which CONTRACTOR may
discover and shall obtain a written interpretation' or
clarification from ENGINEER before proceedine with any
Work affected thereby; however, CONTRACTORsh.al1 not
be liable to OWNER or ENGINEER for failure to report any
conflict, error, ambiguity, or discrepancy in the Contract
Documents unless CONTRACTOR knew or reasonably
should have known then::of.
,.
B. PreUminary Schedules: Within ten days after the
Effective Date of the Agreement (unless otherwise specified
00700 - 9
I
I
I
I
I
I
I
I
I
I
II
II
I
I
I
I
I
I:,
Ii
in the General Requirements), CONTRACTOR shall submit
to ENGINEER for its timely review:
1. a preliminary progress schedule indicating the
times (numbers of days or dates) for starting and
completing the various stages of the Work, including any
Milestones specified in the Contract Documents;
2. a preliminary schedule of Shop Drawing and
Sample submittals which will list each required submittal
and the times for submitting, reviewing, and processing
such submittal; and
3. a preliminary schedule of values for all of the
Work which includes quantities and prices of items which
when added together equal the Contract Price and subdi-
vides the Work into component parts in sufficient detail
to serve as the basis for progress payments during
performance of the Work. Such prices will include an
appropriate amount of overhead and profit applicable to
each item of Work.
C. Evidence of Insurance: Before any Work at the Site
is started, CONTRACTOR and OWNER shall each deliver
to the other, with copies to each additional insured identified
in the Supplementary Conditions, certificates of insurance
(and other evidence of insurance which either of them or any
additional insured may reasonably request) which
CONTRACTOR and OWNER respectively are required to
purchase and maintain in accordance with Article 5.
2.06 Preconstruction Conference
A. Within 20 days after the Contract Times start to run,
but before any Work at the Site is started, a conference
attended by CONTRACTOR, ENGINEER, and others as
appropriate will be held to establish a worldng understanding
among the parties as to the Work and to discuss the schedules
referred to in paragraph 2.05.B, procedures for handling
Shop Drawings and other submittals, processing Applications
for Payment, and maintaining required records.
2.07 Initial Acceptance of Schedules
A. Unless otherwise provided in the Contract Docu-
ments, at least ten days before submission of the frrst
Application for Payment a conference attended by CON-
TRACTOR. ENGINEER, and others as appropriate will be
held to review for acceptability to ENGINEER as provided
below the schedules submitted in accordance with paragraph
2.05.B. CONTRACfOR shall have axi- additional ten days to
make corrections and adjustments and to complete and
resubmit the schedules. No progress payment shall be made
to CONTRACTOR until acceptable schedules are submitted
to ENGINEER.
1. The progress schedule will be acceptable to
ENGINEER if it provides an orderly progression of the
Work to completion within any specified Milestones and
the Contract Times. Such acceptance will not impose on
ENGINEER responsibility for the progress schedule, for
sequencing, scheduling, or progress of the Work nor
interfere with or relieve CONTRACTOR from
CONTRACTOR's full responsibility therefor.
2. CONTRACTOR's schedule of Shop Drawing and
Sample submittals will be acceptable to ENGINEER if it
provides a workable arrangement for reviewing and
processing the required submittals.
3. CONTRACTOR's schedule of values will be
acceptable to ENGINEER as to form and substance if it
provides a reasonable allocation of the Contract Price to
component parts of the Work.
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT,
AMENDING, REUSE
3.01 InJenJ
A. The Contract Documents are complementary; what
is called for by one is as binding as if called for by all.
B. It is the intent of the Contract Documents to describe
a functionally complete Project (or part thereof) to be
constructed in accordance with the Contract Documents.
Any labor, documentation. services, materials, or equipment
that may reasonably be inferred from the Contract Docu-
ments or fro~ prevailing custom or trade usage as being
required to produce the intended result will be provided
whether or not specifically called for at no additional cost to
OWNER.
C. Clarifications . and interpretations of the Contract
Documents shall be issued by ENGINEER as provided in
Article 9.
3.02 Reference Standards
A. Standards, Specifications, Codes, Laws, and
Regulations
1. Reference to standards, specifications, manuals,
or codes of any technical society, organization. or
association, or to Laws or Regulations. whether such
r;eference be specific or by implication. shall mean the
standard, specification. manual, code, or Laws or Regula-
tions in effect at the time of opening of Bids (or on the
Effective Date of the Agreement if there were no Bids),
00700 - 10
~
II
.
.
.
.
.
except as may be otherwise specifically stated in the
Contract Documents.
2. No provision of any such standard, specification,
manual or code, or any instruction of a Supplier shall be
effective to change the duties or responsibilities of
OWNER, CONTRACTOR, or ENGINEER, or any of
their subcontractors, consultants, agents. or employees
from those set forth in the Contract Documents, nor shall
any such provision or instruction be effective to assign to
OWNER, ENGINEER, or any of ENGINEER's
Consultants. agents, or employees any duty or authority
to supervise or direct the performance of the Work or any
duty or authority to undertake responsibility inconsistent
with the provisions of the Contract Documents.
3.03 Reporting and Resolving Discrepancies
A. Reporting Discrepancies
1. If, during the performance of the Work,
CONTRACTOR discovers any conflict, error. ambiguity.
or discrepancy within the Contract Documents or between
the Contract Documents and any provision of any Law or
Regulation applicable to the performance of the Work or
of any standard, specification, manual or code, or of any
instrUction of any Supplier. CONTRACTOR shall report
it to ENGINEER in writing at once. CONTRACTOR
shall not proceed with the Work affected thereby (except
in an emergency as required by paragraph 6.16.A) until
an amendment or supplement to the Contract Documents
has been issued by one of the methods indicated in
paragraph 3.04; provided, however, that CONTRACTOR
shall not be liable to OWNER or ENGINEER for failure
to report any such conflict, error, ambiguity, or dis-
crepancy unless CONTRACTOR knew or reasonably
should have known.thereof.
B. Resolving Discrepancies
1. Except as may be otherwise specifically stated in
the Contract Documents, the provisions of the Contract
Documents shall take precedence in resolving any
conflict, error, ambiguity, or discrepancy between the
provisions of the Contract Documents and:
a. the provisions of any standard, specification,
manual, code, or instniction (whether or not specifi-
cally incorporated by reference in the Contract
Documents); or
b. the provisions of any Laws or Regulations
applicable to the performance of the Work (unless
such an interpretation of the provisions of the
Contract I)ocwneDts would result in violation of such
Law or Regulation).
3.04 Amending and Supplementing Con/ract Documents
A. The Contract Documents may be amended to provide
for additions, deletions. and revisions in the Work or to
modify the tenus and conditions thereof in one or more of the
following ways: (i) a Written Amendment; (ii) a Change
Order; or (iii) a Work Change Directive.
B. The requirements of the Contract Documents may be
supplemented, and minor variations and deviations in the
Work may be authorized, by one or more of the following
ways: (i) a Field Order; (ii) ENGINEER's approval of a
Shop Drawing or Sample; or (iii) ENGINEER's written
interpretation or clarification.
3.05 Reuse of Documents
A. CONTRACTOR and any Subcontractor or Supplier
or other individual or entity performing or furnishing any of
the Work under a direct or indirect contract with OWNER:
(i) shall not have or acquire any title to or ownership rights
in any of the Drawings, Specifications, or other documents
(or copies of any thereof) prepared by or bearing the seal of
ENGINEER or ENGINEER's Consultant, including
electronic media editions; and (ii) shall not reuse any of such
Drawings. Specifications. other documents, or copies thereof
on extensions of the Project or any other project without
written consent of OWNER and ENGINEER and specific
written verification or adaption by ENGINEER. This
prohibition will survive final payment, completion. and
acceptance of the Work. or term.irultion or completion of the
Contract. Nothing herein shall preclude CONTRACTOR
from retaining copies of the Contract Documents for record
purposes.
ARTICLE 4 - A V AlLABn..ITY OF LANDS;
SUBSURFACE AND PHYSICAL CONDmONS;
REFERENCE POINTS
4.01 Availability of Lands
A. OWNER shall furnish the Site. OWNER shall notify
CONTRACTOR of any encumbrances or restrictions not of
general application but specifically related to use of the Site
with which CONTRACTOR must comply in performing the
Work. OWNER will obtain in a timely manner and pay for
easements for permanent stroctures or permanent changes in
existing facUities. If CONTRACTOR and OWNER are
unallle to agree on entitlement to or on the amount or extent,
if any, of any adjustment in the Contract Price or Contract
Times, or both, as a result of any delay in OWNER's
furnishing the Site, CONTRACTOR may make a Claim
therefor as provided in paragraph 10.05.
00700 - 11
B. Upon reasonable written request, OWNER shall
furnish CONTRACTOR with a current statement of record
legal title and legal description of the lands upon which the
Work is to be performed and OWNER's interest therein as
necessary for giving notice of or filing a mechanic's or
construction lien against such lands in accordance with
applicable Laws and Regulations.
C. CONTRACTOR shall provide for all additional lands
and access thereto that may be required for temporary
construction facilities or storage of materials and equipment.
4.02 Subsurface and PJrysical Conditions
A. Reports and Drawings:
Conditions identify:
The Supplementary
1. those reports of explorations and tests of
subsurface conditions at or contiguous to the Site that
ENGINEER has used in preparing the Contract Docu-
ments; and
f
i
2. those drawings of physical conditions in or
relating to existing surface or subsurface structures at or
contiguous to the Site (except Underground Facilities) that
ENGINEER has used in preparing the Contract
Documents.
B. Limited Reliance by CONTRACTOR on Technical
DaJa Authorized: CONTRACTOR may rely upon the
general accuracy of the "technical data" contained in such
reports and drawings, but such reports and drawings are not
Contract Documents. Such "technical data" is identified in
the Supplementary Conditions. Except for such reliance on
such "technical data," CONTRACTOR may not rely upon or
make any Claim against OWNER, ENGINEER, or any of
ENGINEER's Consultants with respect to:
I. the completeness of such reports and drawings
for CONTRACTOR's purposes, including, but not
limited to, any aspects of the means, methods,
techniques, sequences, and procedures of construction to
be employed by CONTRACTOR, and safety precautions
and programs incident thereto; or
2. other data, interpretations, OplillOns, and
information contained in such reports or shown or
indicated in such drawings; or
3. any CONTRACTOR iJ?terpretation of or
conclusion drawn from any -teCbnital data- or any such
other data, interpretations, opinions, or information.
00700 - 12
4.03 Differing Subsurface or Plrysical Coruiitions
A. Notice: If CONTRACTOR believes that any subsur-
face or physical condition at or contiguous to the Site that is
uncovered or revealed either:
I. is of such a nature as to establish that any
"technical data" on which CONTRACTOR is entitled to
rely as provided in paragraph 4.02 is materially
inaccurate; or
2. is of such a nature as to require a change in the
Contract Documents; or
3. differs materially from that shown or indicated in
the Contract Documents; or
4. is of an unusual nature, and differs materially
from conditions ordinarily encountered and generally
recognized as inherent in work of the character provided
for in the Contract Documents;
then CONTRACTOR shall, promptly after becoming aware
thereof and before further disturbing the subsurface or
physical conditions or performing any Work in connection
therewith (except in an emergency as required by paragraph
6.16.A), notify OWNER and ENGINEER in writing about
such condition. CONTRACTOR shall not further disturb
such condition or perform any Work in connection therewith
(except as aforesaid) until receipt of written order to do so.
B. ENGINEER's Review: After receipt of written notice
as required by paragraph 4.03.A, ENGINEER will promptly
review the pertinent condition, determine the necessity of
OWNER's obtaining additional exploration or tests with
respect thereto, and advise OWNER in writing (with a copy
to CONTRACTOR) of ENGINEER's findings and
conclusions.
C. Possible Price and Times Adjustmenls
1. The Contract Price or the Contract Times, or
both, will be equitably adjusted to the extent that the
existence of such differing subsurface or physical
condition causes an increase or decrease in
CONTRACTOR's cost of, or time required for, perfor-
mance of the Work; subject, however, to the following:
a. such condition must meet anyone or more of
the categories described in paragraph 4.03.A; and
r b. with respect to Work that is paid for on a
Unit Price Basis, any adjustment in Contract Price
will be subject to the provisions of paragraphs 9.08
and 11.03.
II
I
I
I
I
I
I. :
'"
2. CONTRACTOR shall not be entitled to any
adjustment in the Contract Price or Contract Times if:
a. CONTRACTOR knew of the existence of
such conditions at the time CONTRACTOR made a
final commitment to OWNER in respect of Contract
Price and Contract Times by the submission of a Bid
or becoming bound under a negotiated contract; or
b. the existence of such condition could
reasonably have been discovered or revealed as a
result of any examination, investigation, exploration,
test, or study of the Site and contiguous areas
required by the Bidding Requirements or Contract
Documents to be conducted by or for CON-
TRACTOR prior to CONTRACTOR's making such
fmal commitment; or
c. CONTRACTOR failed to give the written
notice within the time and as required by paragraph
4.03.A.
3. If OWNER and CONTRACTOR are unable to
agree on entitlement to or on the amount or extent, if any,
of any adjustment in the Contract Price or Contract
Times, or both, a Claim may be made therefor as
provided in paragraph 10.05. However, OWNER,
ENGINEER, and ENGINEER's ConsullaDts shall not be
liable to CONTRACTOR for any claims, costs, losses, or
damages (including but not limited to all fees and charges
of engineers, architects, attorneys, and other professionals
and all court or arbitration or other dispute resolution
costs) sustained by CONTRACTOR on or in connection
with any other project or anticipated project.
4.04 Underground Facilities
A. Shown or Indicated: The information and data shown
or indicated in the Contract Documents with respect. to
existing Underground Facilities at or contiguous to the Site. .
is based on information and data furnished to OWNER or
ENGINEER by the owners of such Underground Facilities,
including OWNER, or by others. Unless it is otherwise
expressly provided in the Supplementary Conditions:
1. OWNER and ENGINEER shall not be
responsible for the accuracy or completeness of any such
information or data; and
2. the cost of all of the following will be included in
the Contract Price, and CONTRACTOR shall have full
responsibility for:
a. reviewing and checking all such information
and data,
00700 - 13
b. locating all Underground Facilities shown or
indicated in the Contract Documents,
c. coordination of the Work with the owners of
such Underground Facilities, including OWNER
during construction, and '
d. the safety and protection of all such Under-
ground Facilities and repairing any damage thereto
resulting from the Work.
B. Not Shown or Indicated
I. If an Underground Facility is uncovered or
revealed at or contiguous to the Site which was not shown
or indicated, or not shown or indicated with reasonable
accuracy in the Contract Documents, CONTRACTOR
shall, promptly after becoming aware thereof and before
further disturbing conditions affected thereby or
performing any Work in connection therewith (except in
an emergency as required by paragraph 6.16.A), identify
the owner of such Underground Facility and give written
notice to that owner and to OWNER and ENGINEER.
ENGINEER will promptly review the Underground
Facility and determine the extent, if any, to which a
change is required in the Contract Documents to reflect
and document the consequences of the existence or
location of the Underground Facility. During such time,
CONTRACTOR shall be responsible for the safety and
protection of such Underground Facility.
2. If ENGINEER concludes that a change in the
Contract Documents is required, a Work Change
Directive or a Change Order will be issued to reflect and
document such consequences. An equitable adjustment
&hall be made in the Contract Price of Contract Times, or
both. to the extent that they are attributable to the
. existence or locationo! any Underground Facility that
was not shown or . indicated or not shown or indicated
. . with reasonable accuracy.in the Contract Documents and
that CONTRACTOR did not know of and could not
reasonably have been expected to be-aware of or to have
anticipated. If OWNER and CONTRACTOR are unable
to agree on entitlement to or on the amount or extent, if
any, of any such adjustment in Contract Price or Contract
Times, OWNER or CONTRACTOR may make a Claim
therefor as provided in paragraph 10.05.
4.05 Reference Poin/~
A. OWNER shall provide engineering surveys to
establish reference Points for construction which in
ENGINEER's judgment are necessary to enable CON-
TRACTOR to proceed with the W~rk. CONTRACTOR
shall be responsible for laying out the Work, &hall protect and
preserve the established reference points and property
,'I'
-
I-
I
monuments. and shall make no changes or relocations
without the prior written approval of OWNER.
CONTRACTOR shall report to ENGINEER whenever any
reference point or property monument is lost or destroyed or
requires relocation because of necessary changes in grades or
locations, and shall be responsible for the accurate
replacement or relocation of such reference points or
property monuments by professionally qualified personnel.
4.06 Hazardous Environme!l1al Condition at Site
A. Reports and Drawings: Reference is made to the
Supplementary Conditions for the identification of those
reports and drawings relating to a Hazardous Environmental
Condition identified at the Site, if any, that have been utilized
by the ENGINEER in the preparation of the Contract
Documents .
B. Limited Reliance by CONTRACTOR on Technical
Data Authorized: CONTRACTOR may rely upon the
general accuracy of the "technical data" contained in such
reports and drawings, but such reports and drawings are not
Contract Documents. Such "technical data" is identified in
the Supplementary Conditions. Except for such reliance on
such "technical data, " CONTRACTOR may not rely upon or
make any Claim against OWNER, ENGINEER or any of
ENGINEER's Consultants with respect to:
1. the completeness of such reports and drawings
for CONTRACTOR's purposes, including, but not
limited to, any aspects of the means, methods,
techniques. sequences and procedures of construction to
be employed by CONTRACTOR and safety precautions
and programs incident thereto; or
2. other data, interpretations. oplDlOns and
information contained in such reports or shown or
indicated in such drawings; or
3. any CONTRACTOR interpretation of or
conclusion drawn from any "technical data" or any such
other data. interpretations, opinions or information.
C. CONTRACTOR shall not be responsible {or any
Hazardous Environmental Condition uncovered or revealed
at the Site which was not shown or indicated in Drawings or
Specifications or identified in the Contract Documents to be
within the scope of the Worle. CONTRACTOR shall be
responsible for a Hazardous Environmental Condition created
with any materials brought to the Site by CONTRACTOR,
Subcontractors, Suppliers, or anyone else for wbom CON-
TRACTOR is responsible.
D. If CONTRACTOR encounters a Hazardous
Environmental Condition or if CONTRACI'OR or anyone for
whom CONTRACTOR is responsible creates a Hazardous
Environmental Condition, CONTRACTOR shall immedi-
ately: (i) secure or otbenvise isolate such condition; (ii) stop
all Work in connection with such condition and in any area
affected thereby (except in an emergency as required by
paragraph 6.16); and (iii) notify OWNER and ENGINEER
(and promptly thereafter confirm such notice in writing).
OWNER shall promptly consult with ENGINEER concerning
the necessity for OWNER to retain a qualified expert to
evaluate such condition or take corrective action, if any.
E. CONTRACTOR shall not be required to resume
Work in connection with such condition or in any affected
area until after OWNER has obtained any required permits
related thereto and delivered to CONTRACTOR written
notice: (i) specifying that such condition and any affected
. area is or.has been rendered safe for the resumption of Work;
or (ii) specifying any special conditions under which such
Work may be resumed safely. If OWNER and
CONTRACTOR cannot agree as to entitlement to or on the
amount or extent, if any, of any adjustment in Contract Price
or Contract Times, or both, as a result of such Work stop-
page or such special conditions under whicb Worle is agreed
to be resumed by CONTRACTOR, either party may make a
Claim therefor as provided in paragraph 10.05.
F. If after receipt of such written notice
CONTRACTOR does not agree to resume such Work based
. on a reasonable belief it is unsafe, or does not agree to
resume such Work under such special conditions, then
OWNER may order the portion of the Work that is in the
area affected by such condition to be deleted from the Work.
If OWNER and CONTRACTOR cannot agree as to
entitlement to or on the amount or extent, if any, of an
adjustment in Contract Price or Contract Times as a result of
deleting such portion of the Work, then either party may
make a Claim therefor as provided in paragraph 10.05.
OWNER may have such deleted portion of the Work
performed by OWNER's own-forces or others in accordance
with Article 7.
G. To the fullest extent permitted by Laws and
Regulations, OWNER sball indemnify and bold barmless
CONTRACTOR, Subcontractors, ENGINEER,
ENGINEER's Consultants and the officers, directors,
partners, employees, agents, other consultants, and
subcontractors of each and any of them from and against all
claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to a
Hazardous Environmental Condition, provided that' sucb
Hazardous Environmental Condition: (i) was not shown or
indicated in the Drawings or Specifications or identified in
the Contract Documents to be included within the scope of
the Work. and (Ii) was not created by CONTRACTOR or by
anyone for wbom CONTRACTOR is responsible. Nothing
00700 - 14
II
I
_J
II
I
- I
_J
}
IJ
II
- j
in this paragraph 4.06.E shall obligate OWNER to indemnify
any individual or entity from and againstlhe consequences of
that individual's or entity's own negligence.
H. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
b.annless OWNER, ENGINEER, ENGINEER's Consultants,
and the officers, directors, partners, employees, agents, olher
consultants, and subcontractors of each and any of them from
and against all claims, costs, losses, and damages (including
but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) arising out of or
relating to a Hazardous Environmental Condition created by
CONTRACTOR or by anyone for whom CONTRACTOR is
responsible. Nothing in this paragraph 4.06.F shall obligate
CONTRACTOR to indemnify any individual or entity from
and against the consequences of that individual's or entity's
own negligence.
I. The provisions of paragraphs 4.02, 4.03, and 4.04
are not intended to apply to a Hazardous Environmental
Condition uncovered or revealed at the Site.
ARTICLE 5 - BONDS AND INSURANCE
5.01 Perfonnance. Paymenr. and Other Bonds
A. CONTRACTOR shall furnish performance and
payment Bonds, each in an amount at least equal to the
Contract Price as security for lhe faithful performance and
payment of all CONTRACTOR's obligations under the
Contract Documents. These Bonds sba1l remain in effect at
least until one year after the date when final payment
becomes due. except as provided otherwise by Laws or
Regu1ations or by the Contract Documems. CONTRACTOR
shaIl also furnish such other Bonds as are required by the
Contract Documents.
B. All Bonds shall be in lhe form prescribed by the
Contract Documents except as provided otherwise by Laws
or Regulations, and shall be executed by such sureties as are
named in the current list of "Companies Holding Certificates
of Authority as Acceptable Sureties on Federal Bonds and as
Acceptable Reinsuring Companies" as published in Circular
570 (amended) by the Financial Management Service. Surety
Bond Branch. U.S. Department of the Treasury. All Bonds
signed by an agent must be accompanied by a certified copy
of such agent's authority to act.
C. If the surety on any Bond furnished by CON-
TRACTOR is declared bankrupt or becomes insolvent or its
right to do business is terminated in any state where any part
of the Project is located or it ceases to meet the requirements
of paragraph 5.01.B, CONTRACTOR shall within 20 days
thereafter substitute another Bond and surety, both of which
sba1l comply with the requirements of paragraphs 5.01.B and
5.02.
5.02 Licensed Sureties and Insurers
A. All Bonds and insurance required by the Contract
Documents to be purchased and maintained by OWNER or
CONTRACTOR shall be obtained from surety or insurance -
companies that are duly licensed or authorized in the
jurisdiction in which the Project is located to issue Bonds or
insurance policies for the limits and coverages so required.
Such surety and insurance companies shall also meet such
additional requirements and qualifications as may be provided
in the Supplementary Conditions.
5.03 Certificates of Insurance
A. CONTRACTOR shall deliver to OWNER, with
copies to each additional insured identified in the Supple-
mentary Conditions, certificates of insurance (and other
evidence of insurance requested by OWNER or any other
additional insured) which CONTRACTOR is required to
purchase and maintain. OWNER shall deliver to
CONTRACTOR, with copies to each additional insured
identified in the Supplementary Conditions, certificates of
insurance (and other evidence of insurance requested by
CONTRACTOR or any other additional insured) which
OWNER is required to purchase and maintain.
5.04 CONTRACTOR's Liability Insurance
A. CONTRACTOR shall purchase and maintain such
liability and other insurance as is appropriate for the Work
being performed and as. will provide protection from claims
set forth below which may arise out of or result from
CONTRACTOR's performance of the Work and
CONTRACTOR's- other- obligations under - the Contract
Documents, whether it is to be performed. by
CONTRACTOR, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to
perform any of the Work, or by anyone for whose acts any
of them may be liable:
1. claims under workers' compensation, disability
benefits, and other similar employee benefit acts;
2. claims for ~ges because of bodily injury,
occupational sickness or disease, or death of
CONTRACTOR's .employees;
,.
3. claims for damages because of bodily injury,
sickness or disease. or dealh of. any person olher than
CONTRACTOR's employees;
00700 - 15
I
IJ
II
II
. 4. claims for damages insured by reasonably
i' available personal injury liability coverage which are sus-
'. tained: (i) by any person as a result of an offense directly
or indirectly related to the employment of such person by
CONTRACTOR, or (ii) by any other person for any
other reason;
5. claims for damages, other than to the Work
itself, because of injury to or destruction of tangible
property wherever located, including loss of use resulting
therefrom; and
6. claims for damages because of bodily injury or
death of any person or property damage arising out of the
ownership, maintenance or use of any motor vehicle.
B. The policies of insurance so required by this
paragraph 5.04 to be purchased and maintained shall:
1. with respect to insurance required by paragraphs
5.04.A.3 through 5.04.A.6 inclusive, include as
additional insureds (subject to any customary exclusion in
respect of professional liability) OWNER, ENGINEER,
ENGINEER's Consultants, and any other individuals or
entities identified in the Supplementary Conditions, all of
whom shall be listed as additional insureds, and include
coverage for the respective officers, directors, partners,
employees, agents, and other consultants and
subcontractors of each and any of all such additional
insureds, and the insurance afforded to these additional
insureds shall provide primary coverage for all claims
covered thereby;
2. include at least the specific coverages and be
written for not less than the limits of liability provided in
the Supplementary Conditions or required by Laws or
Regulations, whichever is greater;
3. include completed operations insurance;
4. include contractual liability insurance covering
CONTRACTOR's indemnity obligations under para-
graphs 6.07,6.11, and 6.20;
5. contain a provision or endorsement that the
coverage afforded will not be canceled, materially
changed or renewal refused until at least thirty days prior
written notice has been given to OWNER and
CONTRACTOR and to each other additional insured
identified in the Supplementary Conditions to whom a
certificate of insurance has' been issued (and the
certificates of insurance furnished by the CONTRACTOR
pursuant to paragraph 5.03 will so provide);
6. remain in effect at least until fmal payment and
at all times thereafter when CONTRACTOR may be
correcting, removing, or replacing defective Work in
accordance with paragraph 13.07; and
7. with respect to completed operations insurance,
and any insurance coverage written on a claims-made
basis, remain in effect for at least two years after final
payment (and CONTRACTOR shall furnish OWNER and
each other additional insured identified in the Supple-
mentary Conditions, to whom a certificate of insurance
has been issued, evidence satisfactory. to OWNER and
any such additional insured of continuation of such
insurance at fmal payment and one year thereafter).
5.05 OWNER's Liability Insurance
A. In addition to the insurance required to be provided
by CONTRACTOR under paragraph 5.04, OWNER, at
OWNER's option, may purchase and maintain at OWNER's
expense OWNER's own liability insurance as will protect
OWNER against claims which may arise from operations
under the Contract Documents.
5.06 Property Insurance
A. Unless otherwise provided in the Supplementary
Conditions, OWNER shall purchase and maintain property
insurance upon the Work at the Site in the amount of the full
replacement cost thereof (subject to such deductible amounts
as may be provided in the Supplementary Conditions or
required by Laws and Regulations). This insurance shall:
1. include the interests of OWNER, CONTRAC-
TOR, Subcontractors, ENGINEER, ENGINEER's
Consultants, and any other individuals or entities identi-
fied in the Supplementary Conditions, and the officers,
directors, partners, employees, agents, and other
consultants and subcontractors of each and any of them,
each of whom is deemed to have an insurable interest and
sh.a1l be listed as an additional insured;
2. be written on a Builder's Risk "all-risk" or open
peril or special causes of loss policy form that shall at
least include insurance for physical loss or damage to the
Work, temporary buildings, false work, and materials and
equipment in transit, and shall insure against at least the
following perils or causes of loss: fIre, lightning,
extended coverage, theft, vandalism and malicious
mischief, earthquake, collapse, debris removal,
demolition occasioned by enforcement of Laws and
Regulations, water damage, and such other perils or
causes of loss as may be specifically required by the
S,Ppplementary Conditions;
3. include expenses incurred in the repair or
replacement of any insured property (including but not
limited to fees and charges of engineers and architects);
00700 - 16
:',..1'
t':
"
Ii
-
-
-
I
If
4. cover materials and equipment stored at the Site
or at another location that was agreed to in writing by
OWNER prior to being incorporated in the Work,
provided that such materials and equipment have been
included in an Application for Payment recommended by
ENGINEER;
5. allow for partial utilization of the Work by
OWNER;
6. include testing and startup; and
7. be maintained in effect Wltil fmal payment is
made unless otherwise agreed to in writing by OWNER,
CONTRACTOR, and ENGINEER with 30 days written
notice to each other additional insured to whom a certifi-
cate of insurance has been issued.
B. OWNER shall purchase and maintain such boiler and
machinery insurance or additional property insurance as may
be required by the Supplementary Conditions or Laws and
Regulations which wi1\ include the interests of OWNER,
CONTRACTOR, Subcontractors, ENGINEER,
ENGINEER's Consultants, and any other individuals or
entities identified in the Supplementary Conditions, each of
whom is deemed to have an insurable interest and shall be
listed as an insured or additional insured.
C. All the policies of insurance (and the certificates or
other evidence thereof) required to be purchased and
mllintllined in accordance with paragraph 5.06 wi1\ contain a
provision or endorsement that the coverage afforded wi1\ not
be canceled or materially changed or renewal refused until at
least 30 days prior written notice has been given to OWNER
and CONTRACfORand to each other additional insured to
whom a certificate of insurance has been issued and will
contain waiver provisions in accordance with paragraph 5JJ7.
D. OWNER shall not be responsible for purchasing and
maintaining any property insurance specified in this
paragraph 5.06 to protect the interests of CONTRACTOR,
Subcontractors, or others in the Work to the extent of any
deductible amounts that are identified in the Supplementary
Conditions. The risk of loss within such identified deductible
amount will be borne by CONTRACTOR, Subcontractors,
or others suffering any such loss, and if any of them wishes
property insurance coverage within the limits of such
amounts, each may purchase and maintain it at the
purchaser's own expense.
E. If CONTRACfOR requests in writing that other
special insurance be included in the property insurance
policies provided under paragraph 5.06, OWNER shall, if
possible, include such insurance, and the cost thereof will be
charged to CONTRACfOR by appropriate Change Order or
Written Amendment. Prior to commencement of the Work
at the Site, OWNER shall in writing advise CONTRACTOR
whether or not such other insurance has been procured by
OWNER.
5.07 Waiver of Rights
A. OWNER and CONTRACTOR intend that all policies
purchased in accordance with paragraph 5.06 will protect
OWNER, CONTRACTOR, Subcontractors, ENGINEER,
ENGINEER's Consultants, and all other individuals or
entities identified in the Supplementary Conditions to be
listed as insureds or additional insureds (and the officers,
directors, partners, employees, agents, and other consultants
and subcontractors of each and any of them) in such policies
and will provide primary coverage for all losses and damages
caused by the perils or causes ofIoss covered thereby . All
such policies shall contain provisions to the effect that in the
event of payment of any loss or damage the insurers wi1\
have no rights of recovery against any of the insureds or
additional insureds thereunder. OWNER and CONTRAC-
TOR waive all rights against each other and their respective
officers, directors, partners, employees, agents, and other
consultants and subcontractors of each and any of them for
all losses and damages caused by, arising out of or resulting
from any of the perils or causes of loss covered by such
policies and any other property insurance applicable to the
Work; and, in addition, waive all such rights against
Subcontractors, ENGINEER, ENGINEER's Consultants, and
all other individuals or entities identified in the Supplemen-
tary Conditions to be listed as insureds or additional insureds
(and the officers, directors, partners, employees, agents, and
other consultants and subcontractors of each and any of them)
under such policies for losses and damages so caused. None
of the above waivers shall extend to the rights that any party
making such waiver may have to the proceeds of insurance
held by OWNER as trustee or otherwise payable under any
policy so issued.
- ~ B. OWNER waives-all rights against CONTRACTOR,
Subcontractors, ENGINEER. 'ENGINEER's Consultants. and
the officers, directors, partners, employees, agents, and other
consultants and subcontractors of each and any of them for:
1. loss due to business interruption, loss of use, or
other consequential loss extending beyond direct physical
loss or damage to OWNER's property or the Work
caused by, arising out of, or resulting from fire or other
peril whether or not insured by OWNER; and
2. loss or damage to the completed Project or part
. thereof caused by, arising out of, or resulting from fire or
- otl}er insured peril or cause of loss covered by any
property insurance maintained on the completed Project
or part thereof by OWNER during partial utilization
pursuant to paragraph 14.05, after Substantial Completion
00700 - 17
I
Ii
Ii
Ii
B. OWNER as fiduciary shall have power to adjust and
settle any loss with the insurers unless one of the parties in
interest shall object in writing within 15 days after the
occurrence of loss to OWNER's exercise of this power. If A. CONTRACTOR shall supervise, inspect, and direct
such objection be made, OWNER as fiduciary shall make the Work competently and efficiently, devoting such attention
settlement with the insurers in accordance with such thereto and applying such skills and expertise as may be
agreement as the parties in interest may reach. If no such necessary to perform the Work in accordance with the
agreemeo1 among the parties in interest is reached, OWNER Contract Documents. CONTRACTOR sh.aI1 be solely
as fiduciary shall adjust and settle the loss with the insurers responsible for the means, methods, techniques, sequences,
and, if required in writing by any party in interest, OWNER' o' . and procedures ()fconstruction:, .but CONTRACfOR shall
as fiduciary shall give bond for the proper performance of not be responsible for the negligence of OWNER or
such duties. ENGINEER in the .design .or. specification of a specific
means, method, technique, sequence, or procedure of
construction which is shown or indicated in and expressly
required by the Contract Documents. CONTRACTOR sh.all
be responsible to see that the completed Work complies
accurately with the Contract Documents.
pursuant to paragraph 14.04, or after final payment
pursuant to paragraph 14.07.
< C. Any insurance policy maintained by OWNER cover-
;fug any loss, damage or consequential loss referred to in
,paragraph 5.07.B shall contain provisions to the effect that in
,.;the event of payment of any such loss, damage, or
S~DSequential loss, the insurers will have no rights of
:t:recovery against CONTRACTOR, Subcontractors,
~;'ENGlNEER, or ENGINEER's Consultants and the officers,
>directors, partners, employees, agents, and other consultants
it"~ and subcontractors of each and any of them.
5.08 Receipt and Application of Insurance Proceeds
A. Any insured loss under the policies of insurance
required by paragraph 5.06 will be adjusted with OWNER
and made payable to OWNER as fiduciary for the insureds,
as their interests may appear, subject to the requirements of
any applicable mortgage clause and of paragraph 5.08.B.
OWNER shall deposit in a separate account any money so
received and shall distribute it in accordance with such agree-
ment as the parties in interest may reach. If no other special
agreement is reached, the damaged Work shall be repaired or
replaced, the moneys so received applied on account thereof,
and the Work and the cost thereof covered by an appropriate
Change Order or Written Amendment.
5.09 Acceptance of Bonds and Insurance; Option to
Replace
A. If either OWNER or CONTRACTOR has any
objection to the coverage afforded by or other provisions of
the Bonds or insurance required to be purchased and
maintained by the other party in accordance with Article 5 on
the basis of non<onformance with the Contract Documents,
the objecting party shall so notify the other party in writing
within 10 days after receipt of the certificates (or other
evidence requested) required by paragraph 2.0S.C. OWNER
and CONTRACTOR shall each provide to the other such
additional information in respect of insurance provided as the
other may reasonably request. If either party does not
, purchase or mainfain all of the Bonds and insurance required
of such party by the Contract Documents, such party shall
notify the other party in writing of such failure to purchase
prior to the start of the Work, or of such failure to maintain
prior to any change in the required coverage. Without
prejudice to any other right or remedy, the other party may
elect to obtain equivalent Bonds or insurance to protect such
other party's interests at the expense of the party who was
required to provide such coverage, and a Change Order shall
be issued to adjust the Contract Price accordingly.
5.10 Partial Utilization, AcJ..:nowledgmenJ of Property
Insurer
A. If OWNER finds it necessary to occupy or use a
portion or portions of the Work prior to Substantial
Completion of all the Work.as provided in paragraph 14.05,
no such use or occupancy shall commence before the insurers
providing the property insurance pursuant to paragraph 5.06
have acknowledged notice thereof and in writing effected any
changes in coverage necessitated thereby. The insurers
providing the property insurance shall consent by endorse-
ment on the policy or policies, but the property insurance
shall not be canceled or permitted to lapse on account of any
such partial use or occupancy.
ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES
6.01
Supervision and Superimendence
B. At all times during the progress of the Work,
CONTRACTOR shall assign a competent resident superin-
tendent thereto who shall not be replaced without written
notice to OWNER and ENGINEER except under
extraordinary circumstances. The mperintendent will be
COl)ITRACTOR's representative at the Site and sba11 have
authority to act on behalf of CONTRACTOR. All
communications given to or received from the superintendent
shall be binding on CONTRACTOR.
00700 - 18
lAbor; Working Hours
A. CONTRACTOR shall provide competent, suitably
qualified personnel to survey, layout, and construct the
Work as required by the Contract Documents. CON-
TRACTOR shaH at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or
protection of persons or the Work or property at the Site or
adjacent thereto, and except as otherwise stated in the
Contract Documents, all Work at the Site shall be perfonned
during regular working hours, and CONTRACTOR will not
permit overtime work or the performance of Work on
Saturday, Sunday, or any legal holiday without OWNER's
written consent (which will not be unreasonably withheld)
given after prior written notice to ENGINEER.
6.03 Services, Malerials, and Equipment
A. Unless otherwise specified in the General Re-
quirements, CONTRACTOR shall provide and assume full
responsibility for all services, materials, equipment, labor,
transportation, construction equipment and machinery, tools,
appliances, fuel, power, light, heat, telephone, water,
sanitary facilities, temporary facilities, and all other facilities
and incidentals necessary for the performance, testing,
start-up, and completion of the Work.
I
[
I
I
I
I
I
B. All materials and equipment incorporated into the
Work shall be as specified or, if not specified, shall be of
good quality and new, except as otherwise provided in the
Contract Documents. All warranties and guarantees
specifically called for by the Specifications shall expressly
nm to the benefit of OWNER. If required by ENGINEER,
CONTRAcroR shall furnish satisfactory evidence
(mcluding reports of required tests) as to the source, kind,
and quality of materials and equipment. All materials and
equipment shall be stored, applied, installed, connected,
erected, protected, used, cleaned, and conditioned in
accordance with instructions of the applicable Supplier,
except as otherwise may be provided in the Contract Docu-
ments.
6.04 Progress Schedule
A. CONTRACfOR shall adhere to the progress schedule
established in accordance with paragraph 2.07 as it may be
adjusted from time to time as provided below.
I. CONTRACI"OR shall submit to ENGINEER for
acceptance (to the extent indicated in paragraph 2.07)
proposed adjustments in the progress schedule that will
not result in changing the Contract TIIDeS (or Milestones).
Such adjustments will conform generally to the progress
schedule then in effect and additionally will comply with
00700 - 19
any provisions of the General Requirements applicable
thereto.
2. Proposed adjustments in the progress schedule
that will change the Contract Times (or Milestones) shall
be submitted in accordance with the requirements of
Article 12. Such adjustments may only be made by a
Change Order or Written Amendment in accordance with
Article 12.
6.05 Substitutes and "Or-Equals"
A. Whenever an item of material or equipment is
specified or described in the Contract Documents by using
the name of a proprietary item or the name of a particular
Supplier, the specification or description is intended to
establish the type, function, appearance, and quality required.
Unless the specification or description contains or is followed
by words reading that no like, equivalent, or "or-equ.al" item
or no substitution is permitted, other items of material or
equipment or material or equipment of other Suppliers may
be submitted to ENGINEER for review under the circum-
stances described below.
1. "Or-Equal" Items: If in ENGINEER's sole
discretion an item of material or equipment proposed by
CONTRACTOR is functionally equal to that named and
sufficiently similar so that no change in related Work will
be required, it may be considered by ENGINEER as an
"or-equal" item, in which case review and approval of
the proposed item may, in ENGINEER's sole discretion,
be accomplished without compliance with some or all of
the requirements for approval of proposed substitute
items. For the purposes of this paragraph 6.05.A.l, a
proposed item of material or equipment will be
considered functionally equal to an item so named if:
a. in the exercise of reasonable judgment
ENGINEER determines that: (i) it is at least equal in
quality, durability, appearance, strength, and design
characteristics; (ii) it will. reliably perform at least
equally well the function imposed by the design
concept of the completed Project as a functioning
whole, and;
b. CONTRACTOR certifies that: (i) there is no
increase in cost to the OWNER; and (ii) it will
conform substantially, even with deviations, to the
detailed requirements of the item named in the
Contract Documents.
,. 2. Substitute Items
a. If in ENGINEER's sole discretion an item of
material or equipment proposed by CONTRACTOR
does not qua::fy as an "or-equal" item under
-
1IiI1."-
II
paragraph 6.05.A.I, it will be considered a proposed
substitute item.
b. CONTRACTOR shall submit sufficient
information as provided below to allow ENGINEER
to determine that the item of material or equipment
proposed is essentially equivalent to that named and
an acceptable substitute therefor. Requests for
review of proposed substitute items of material or
equipment will not be accepted by ENGINEER from
anyone other than CONTRACTOR.
c. The procedure for review by ENGINEER
will be as set forth in paragraph 6.05.A.2.d, as
supplemented in the General Requirements and as
ENGINEER may decide is appropriate under the
circumstances.
d. CONTRACTOR shall first make written
application to ENGINEER for review of a proposed
substitute item of material or equipment that
CONTRACTOR seeks to furnish or use. The
application shall certify that the proposed substitute
item will perform adequately the functions and
achieve the results called for by the general design,
be similar in substance to that specified, and be suited
to the same use as that specified. The application
will state the extent, if any, to which the use of the
proposed substitute item will prejudice
CONTRACTOR's achievement of Substantial
Completion on time, whether or not use of the
proposed substitute item in the Work will require a
change in any of the Contract Documents (or in the
provisions of any other direct contract with OWNER
for work on the Project) to adapt the design to the
proposed substitute item and whether or not
incorporation or use of the proposed substitute item
in connection with the Work is subject to payment of
any license fee or royalty. All variations of the pro-
posed substitute item from that specified will be
identified in the application, and available
engineering, sales, maintenance, repair, and
replacement services will be indicated. The
application will also conuin an itemized estimate of
all costs or credits that will result directly or indi-
rectly from use of such substitute item, including
costs of redesign and claims of other contractors
affected by any resulting change, all of which will be
considered by ENGINEER in evaluating the proposed
substitute item. ENGIN~ER may require CON-
TRACfOR to furnish additional data about the pro-
posed substitute item.
B. Substitute Construction Methods or Procedures: If a
specific means, method, technique, sequence, or procedure
of construction is shown or indicated in and expressly
00700 - 20
required by the Contract Documents, CONTRACTOR may
furnish or utilize a substitute means, method, technique.
sequence, or procedure of construction approved by ENGI-
NEER. CONTRACTOR shall submit sufficient information
to allow ENGINEER, in ENGINEER's sole discretion, to
determine that the substitute proposed is equivalent to that
expressly called for by the Contract Documents. The proce-
dure for review by ENGINEER will be similar to that
provided in subparagraph 6.05.A.2.
C. Engineer's Evaluation: ENGINEER will be allowed
a reasonable time within which to evaluate each proposal or
submittal made pursuant to paragraphs 6.05.A and 6.05.B.
ENGINEER will be the sole judge of accepubility. No
"or-equal" or substitute will be ordered, installed or utilized
until ENGINEER's review is complete, which will be
evidenced by either a Change Order for a substitute or an
approved Shop Drawing for an "or equal.. ENGINEER will
advise CONTRACTOR in writing of any negative
determination.
D. Special Guarantee: OWNER may require CON-
TRACTOR to furnish at CONTRACTOR's expense a special
performance guarantee or other surety with respect to any
substitute.
E. ENGINEER's Cost ReimbursemenJ: ENGINEER will
record time required by ENGINEER and ENGINEER's
Consultants in evaluating substitute proposed or submitted by
CONTRACTOR pursuant to paragraphs 6.05.A.2 and 6.05.B
and in making changes in the Contract Documents (or in the
provisions of any other direct contract with OWNER for
work OD the Project) occasioned thereby. Whether or not
ENGINEER approves a substitute item so proposed or
submitted by CONTRACTOR, CONTRACTOR shall
reimburse OWNER for the charges of ENGINEER and
" ENGINEER's Consultantsiorevaluating each such proposed
substitute.
F. CONTRACTOR's Expense: CONTRACTOR shall
provide all data in support of any proposed substitute or
"or-equal" at CONTRACTOR's expense.
6.06 Concerning SubconJractors, Suppliers. and Others
A. CONTRACTOR shall not employ any Subcontractor,
Supplier, or other individual or entity (including those
accepuble to OWNER as indicated in paragraph 6.06.B),
whether initially or as a replacement, against whom OWNER
may have reasonable objection. CONTRACTOR shall not be
required to employ any Subcontractor, Supplier, or other
indinduaI or entity to furnish or perform any of the Work
against whom CONTRACTOR has reasonable objection.
B. If the Supplementary Conditions require the identity
of certain Subcontractors, Suppliers, or other individuals or
"
cnrities to be submitted to OWNER in advance for acceptance
by OWNER by a specified date prior to the Effective Date of
the Agreement, and if CONTRACTOR has submitted a list
thereof in accordance with the Supplementary Conditions,
OWNER's acceptance (either in writing or by failing to make
written objection thereto by the date indicated for acceptance
or objection in the Bidding Documents or the Contract
Documents) of any such Subcontractor, Supplier, or other
individual or entity so identified may be revoked on the basis
of reasonable objection after due investigation. CON-
TRACTOR shall submit an acceptable replacement for the
rejected Subcontractor, Supplier, or other individual or
entity, and the Contract Price will be adjusted by the differ-
ence in the cost occasioned by such replacement, and an
appropriate Change Order will be issued or Written
Amendment signed. No acceptance by OWNER of any such
Subcontractor, Supplier, or other individual or entity,
whether initially or as a replacement, shall constitute a
waiver of any right of OWNER or ENGINEER to reject
defective Work.
C. CONTRACTOR shall be fully responsible to
OWNER and ENGINEER for all acts and omissions of the
Subcontractors, Suppliers, and other individuals or entities
performing or furnishing any of the Work just as
CONTRACTOR is responsible for CONTRACTOR's own
acts and omissions. Nothing in the Contract Documents shall
create for the benefit of any such Subcontractor, Supplier, or
other individual or entity any contractual relationship between
OWNER or ENGINEER and any such Subcontractor,
Supplier or other individual or entity, nor shall it create any
obligation on the part of OWNER or ENGINEER to payor
to see to the payment of any moneys due any such Subcon-
tractor, Supplier, or other individual or entity except as may
otherwise be required by Laws and Regulations.
D. CONTRACTOR shall be solely responsible for
scheduling and coorrlinatiJJg the Work of Subcontractors,
Suppliers, and other individuals or entities performing .or.
furnishing any of the Work under a direct or indirect contract .
with CONTRACTOR.
.
I
I
I
E. CONTRACTOR shall require all Subcontractors,
Suppliers, and such other individuals or entities performing
or furnishing any of the Work to communicate with ENGI-
NEER through CONTRACTOR.
F. The divisions and sections of the Specifications and
the identifications of any Drawings shall not control
CONTRACTOR in dividing che Work among Subcontractors
or Suppliers or delineating che Work to be performed by any
specific trade.
G. All Work performed for CONTRACTOR by a
Subcontractor or Supplier will be pursuant to an appropriate
agreement between CONTRACTOR and the Subcontractor
I
II
or Supplier which specifically binds the Subcontractor or
Supplier to the applicable terms and conditions of the
Contract Documents for the benefit of OWNER and
ENGINEER. Whenever any such agreement is with a
Subcontractor or Supplier who is listed as an additional
insured on the property insurance provided in paragraph
5.06, the agreement between the CONTRACTOR and the
Subcontractor or Supplier will contain provisions whereby
the Subcontractor or Supplier waives all rights against
OWNER, CONTRACTOR, ENGINEER, ENGINEER's
Consultants, and all other individuals or entities identified in
the Supplementary Conditions to be listed as insureds or
additional insureds (and the officers, directors, partners,
employees, agents, and other consultants and subcontractors
of each and any of them) for all losses and damages caused
by, arising out of, relating to, or resulting from any of the
perils or causes of loss covered by such policies and any
other property insurance applicable to the Work. If the
insurers on any such policies require separate waiver forms
to be signed by any Subcontractor or Supplier. CONTRAC-
TOR will obtain the same.
6.07 Palen! Fees and Royalties
A. CONTRACTOR shall pay all license fees and
royalties and assume all costs incident to the use in the
perfonnance of the Work or the inrorporation in the Work of
any invention, design, process, product, or device which is
the subject of patent rights or copyrights held by others. If
a particular invention, design, process, product, or device is
specified in the Contract Documents for use in the
performance of the Work and if to the actual knowledge of
OWNER or ENGINEER its use is subject to patent rights or
copyrights calling for the payment of any license fee or
royalty to others, the existence of such rights shall be
disclosed by OWNER in the Contract Documents. To the
fullest extent permitted by laws and Regulations,
CONTRACTOR . shall. indemnify and hold harmless
OWNER. ENGINEER. ENGINEER's Consultants, and the
. _ officers~~directors,partners...employees or agents, and other
consultants of each' and any of them from and against all
claims, costs. losses, and damages .(includlng but not limited
to all fees and charges of engineers, architects. attorneys, and
other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to any
infringement of patent rights or copyrights incident to the use
in the performance of the Work or resulting from the
incorporation in the Work of any invention, design, process,
product. or device not specified in the Contract Documents.
6.08 Permits
A.r Unless otherwise provided in the Supplementary
Conditions, CONTRACTOR shall ob~ and pay for all
construction permits and licenses. OWNER shall assist
CONTRACTOR. when necessary, in obtaining such permits
00700 - 21
.~.:.
III
and licenses. CONTRACTOR shall pay all governmental
charges and inspection fees necessary for the prosecution of
the Work which are applicable at the time of opening of Bids,
or, if there are no Bids, on the Effective Date of the
Agreement. CONTRACTOR shall pay all charges of utility
owners for connections to the Work, and OWNER shall pay
all charges of such utility owners for capital costs related
thereto, such as plant investment fees.
6.09 Laws and Regu/aJions
A. CONTRACTOR shall give all notices and comply
with all Laws and Regulations applicable to the performance
of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, neither OWNER nor
ENGINEER shall be responsible for monitoring
CONTRACTOR's compliance with any Laws or Regulations.
B. If CONTRACTOR performs any Work mowing or
having reason to know that it is contrary to Laws or
Regulations, CONTRACTOR shall bear all claims, costs,
losses, and damages (including but not limited to all fees and
charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to such Work;
however, it shall not. be CONTRACTOR's primary
responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but
this shall not relieve CONTRACTOR of CONTRACTOR's
obligations under paragraph 3.03.
C. Changes in Laws or Regulations not mown at the
time of opening of Bids (or, on the Effective Date of the
Agreement if there were no Bids) having an effect on the cost
or time of performance of the Work may be the subject of an
adjustment in Contract Price or Contract Times. If OWNER
and CONTRAcroR are unable to agree on entitlement to or
on the amount or extent, if any, of any such adjustment, .a
Claim may be made therefor as provided in paragraph 10.05.
6.10 Taxes
A. CONTRACTOR shall pay all sales, consumer, use,
and other similar taxes required to be paid by CONTRAC-
TOR in accordance with the Laws and Regulations of the
place of the Project which are applicable during the
performance of the Work.
6. I 1 Use of Site and Other Areas
A. LimiJation on Use of Site and Other Areas
1. CONTRACTOR shall confme construction
equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas
permitted by Laws and Regulations, and shall not
unreasonably encumber the Site and other areas with
construction equipment or other materials or equipment.
CONTRACTOR shall assume full responsibility for any
damage to any such land or area, or to the owner or
occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. Should any claim be made by any such owner or
occupant because of the performance of the Work,
CONTRACTOR shall promptly settle with such other
party by negotiation or otherwise resolve the claim by
arbitration or other dispute resolution proceeding or at
law.
3. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless OWNER, ENGINEER, ENGINEER's
Consultant, and the officers, directors, partners,
employees, agents, and other consultants of each and any
of them from and against all claims, costs, losses, and
damages (including but not limited to all fees and charges
of engineers, architects, attorneys, and other professionals
and all court or arbitration or other dispute resolution
costs) arising out of or relating to any claim or action,
legal or equitable, brought by any such owner or occupant
against OWNER, ENGINEER, or any other party
indemnified hereunder to the extent caused by or based
upon CONTRACTOR's performance of the Work.
B. Removal of Debris During Perfonnance of the Work:
During the progress of the Work CONTRACTOR shall keep
the Site and other areas free from accumulations of waste
materials, rubbish, and other debris. Removal and disposal
of such waste materials, rubbish, and other debris shall con-
form to applicable Laws and Regulations.
C. Cleaning: Prior to Substantial Completion of the
WorkCON1RACTORshal1.clean the Site and make it ready
for utilization by OWNER. At the completion of the Work
CONTRACTOR shall remove from the Site all tools,
appliances, construction equipment and machinery, and
surplus materials and shall restore to original condition all
property not designated for alteration by the Contract
Documents .
D. Loading Structures: CONTRACTOR shall not load
nor permit any part of any structure to be loaded in any
manner that will endanger the structure, nor shall
CONTRACTOR subject any part of the Work or adjacent
property to stresses or pressures that will endanger it.
6.12 Record Documents
r
A. CONTRACTOR shall JTI:linttlio in a safe place at the
Site one record copy of all Drawings, Specifications,
Addenda, Written Amendments, Change Orders, Work
00700 - 22
Ql.ange Directives, Field Orders, and written interpretations
and clarifications in good order and annotated to show
changes made during construction. These record documents
together with all approved Samples and a counterpart of all
approved Shop Drawings will be available to ENGINEER for
reference. Upon completion of the Work, these record
documents, Samples, and Shop Drawings will be delivered to
ENGINEER for OWNER.
6.13 Safety and Protection
A. CONTRACTOR shall be solely responsible for
initiating, maintaining and supervising all safety precautions
and programs in connection with the Work. CONTRACTOR
shall take all necessary precautions for the safety of, and
shall provide the necessary protection to prevent damage,
injury or loss to:
1. all persons on the Site or who may be affected .
by the Work;
2. all the Work and materials and equipment to be
incorporated therein, whether in storage on or off the
Site; and
3. other property at the Site or adjacent thereto,
including trees, shrubs, lawns, walks, pavements,
roadways, structures, utilities, and Underground Facilities
not designated for removal, relocation, or replacement in
the course of constructioD.
B. CONTRACTOR shall comply with all applicable
Laws and Regulations relating to the safety of persons or
property, or to the protection of persons or property from
damage, injury, or loss; and shall erect and maintain all
necessary safeguards for such safety and protection.
CONTRAcroR shall notify owners of adjacent property and
of Underground Facilities and other utility owners when
prosecution of the Work may affect them. and sball cooperate
with them in the protection, removal, relocation, and
replacement of their property. All damage, injury, or loss to
any property referred to in paragraph 6.13.A.2 or 6.13.A.3
caused, directly or indirectly, in whole or in part, by CON-
TRACTOR, any Subcontractor, Supplier, or any other
individual or entity directly or indirectly employed by any of
them to perform any of the Work, or anyone for whose acts
any of them maybe liable, shall be remedied by
CONTRACTOR (except damage or loss attributable to the
fault of Drawings or Specifications or to the acts or
omissions of OWNER or ENGINEER or ENGINEER's Con-
sultant, or anyone employed by any of them, or anyone for
whose acts any of them may be liable, and not attributable,
directly or indirectly, in whole or in part, to the fault or
negligence of CONTRACTOR or any Subcontractor,
Supplier, or other individual or entity directly or indirectly
employed by any of them). CONTRACTOR's duties and
I
responsibilities for safety and for protection of the Work &hall
continue until such time as all the Work is completed and
ENGINEER has issued a notice to OWNER' and
CONTRACTOR in accordance with paragraph 14.07.B that
the Work is acceptable (except as otherwise expressly
provided in connection with Substantial Completion).
6.14 Safety Represeruative
A. CONTRACTOR shall designate a qualified and
experienced safety representative at the Site whose duties and
responsibilities shall be the prevention of accidents and the
maintaining and supervising of safety precautions and
programs.
6.15 Hazard Communicalion Programs
A. CONTRACTOR shall be responsible for coordinating
any exchange of material-safety .data sheets or other hazard
communication information required to be made available to
or exchanged between or among employers at the Site in
accordance with Laws or Regulations.
6.16 Emergencies
A. In emergencies affecting the safety or protection of
persons or the Work or property at the Site or adjacent
thereto, CONTRACTOR is obligated to act to prevent
threatened damage, injury, or loss. CONTRACTOR shall
give ENGINEER prompt written notice if CONTRACTOR
believes that any significant changes in the Work or
variations from the Contract Documents have been caused
thereby or are required as a result thereof. If ENGINEER
determines that a change in the Contract Documents is
required because of the action taken by CONTRACTOR in
response to such an emergency, a Work Change Directive or
Change Order will be issued.
6~ 17 Shop Drawings and Samples
A. CONTRACTOR shall submit Shop Drawings to
ENGINEER for review and appro:val in accordance with the
acceptable schedule of Shop Drawings and Sample
submittals. All submittals will be identified as ENGINEER
may require and in the number of copies specified in the
General Requirements. The data shown on the Shop
Drawings will be complete with respect to quantities, dimen-
sions, specified performance and design criteria, materials,
and similar data to show ENGINEER the services, materials,
and equipment CONTRACTOR proposes to provide and to
enable ENGINEER to review the information for the limited
porposes required by paragraph 6.17.E.
,.
B. CONTRACTOR shall also submit Samples to
ENGINEER for review and approval ui accordance with the
acceptable schedule of Shop Drawings and Sample
00700 - 23
,-
! .
-
11
I
bmittals. Each Sample wiIl be identified clearly as to
terial, Supplier, pertinent data such as catalog numbers,
the use for which intended and otherwise as ENGINEER
Play require to enable ENGINEER to review the submittal
'for the limited purposes required by paragraph 6. 17. E. The
,numbers of each Sample to be submitted will be as specified
'in the Specifications.
C. Where a Shop Drawing or Sample is required by the
Contract Documents or the schedule of Shop Drawings and
Sample submittals acceptable to ENGINEER as required by
paragraph 2.07, any related Work perfonned prior to
ENGINEER's review and approval of the pertinent submittal
will be at the sole expense and responsibility of
CONTRACTOR.
D. Submittal Procedures
I. Before submitting each Shop Drawing or Sample,
CONTRACTOR shall have determined and veriiied:
a. all field measurements, quantities, dimen-
sions, specified performance criteria, installation
requirements, materials, catalog numbers, and
similar information with respect thereto;
b. all materials with respect to intended use,
fabrication, shipping, handling, storage, assembly,
and installation pertaining to the perfonnance of the
Work;
c. all information relative to means, methods,
techniques, sequences, and procedures of construc-
tion and safety precautions and programs incident
thereto; and
d. CONTRACTOR sha11 also have reviewed
and coordinated each Shop Drawing or Sample with
other Shop Drawings and Samples and with the
requirements of the Work and the Contract Docu-
ments.
2. Each submittal shall bear a stamp or specific
written indication that CONTRACTOR has satisfied
CONTRACTOR's obligations under the Contract
Documents with respect to CONTRACTOR's review and
approval of that submittal.
3. At the time of each submittal, CONTRACTOR
shall give ENGINEER specific written notice of such
variations, if any, that the Shop: Drawing or Sample
submitted may have from the requirements of the
Contract Documents, such notice to be in a written com-
munication separate from the submittal; and, in addition,
sha11 cause a specific notation to be made on each Shop
00700 - 24
Drawing and Sample submitted to ENGINEER for review
and approval of each such variation.
E. ENGINEER's Review
1. ENGINEER will timely review and approve
Shop Drawings and Samples in accordance with the
schedule of Shop Drawings and Sample submittals
acceptable to ENGINEER. ENGINEER's review and
approval will be only to determine if the items covered by
the submittals will, after installation or incorporation in
the Work, conform to the information given in the
Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole
as indicated by the Contract Documents.
2. ENGINEER's review and approval will not
extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular
means, method, technique, sequence, or procedure of
construction is specifically and expressly called for by the
Contract Documents) or to safety precautions or programs
incident thereto. The review and approval of a separate
item as such will not indicate approval of the assembly in
which the item functions.
3. ENGINEER's review and approval of Shop
Drawings or Samples shall not relieve CONTRACTOR
from responsibility for any variation from the require-
ments of the Contract Documents unless CONTRACTOR
has in writing called ENGINEER's attention to each such
variation at the time of each submittal as required by
paragraph 6.17.D.3 and ENGINEER has given written
approval of each such variation by specific written
notation thereof incorporated in or accompanying the
Shop Drawing or Sample approval; nor will any approval
by ENGINEER relieve CONTRACTOR .from
responsibility _ for - complying:with the requirements of
paragraph 6.17.D.1.
F. Resubmittal Procedures
1. CONTRACTOR shall make corrections required
by ENGINEER and shall return the required number of
corrected copies of Shop Drawings and submit as
required new Samples for review and approval. CON-
TRACTOR shall direct specific attention in writing to
revisions other than the corrections called for by ENGI-
NEER on previous submittals.
6.18 Continuing the Work
l'
A. CONTRACTOR sha11 carry on the Work and adhere
to the progress schedule during all disputes or disagreements
with OWNER. No Work shall be delayed or postponed
pending resolution of any disputes or disagreements, except
di
B
~
-
permitted by paragraph 15.04 or as OWNER and
ONTRACTOR may otherwise agree in writing.
CONTRACTOR's General Warranty and Guaranlee
A. CONTRACTOR warrants and guarantees to
OWNER, ENGINEER, and ENGINEER's Consultants that
all Work will be in accordance with the Contract Documents
and will not be defective. CONTRACTOR's warranty and
guarantee hereunder excludes defects or damage caused by:
I. abuse, modification, or improper maintenance or
operation by persons other than CONTRACTOR, Sub-
contractors, Suppliers, or any other individual or entity
for whom CONTRACTOR is responsible; or
2. normal wear and tear under normal usage.
B. CONTRACTOR's obligation to perform and
complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will
constitute an acceptance of Work that is not in accordance
with the Contract Documents or a release of
CONTRACTOR's obligation to perform the Work in
accordance with the Contract Documents:
1. observations by ENGINEER;
2. recommendation by ENGINEER or payment by
OWNER of any progress or final payment;
3. the issuance of a certificate of Substantial
Completion by ENGINEER or any payment related
thereto by OWNER;
4. use or occupancy of the Work or any part thereof
by OWNER;
5. any acceptance by OWNER or any failure to do
so;
6. any review and approval ofa Shop Drawing or
Sample submittal or the issuance of a notice of acceptabil-
ity by ENGINEER;
7. any inspection, test, or approval by others; or
8. any correction of defective Work by OWNER.
6.20 Indemnification
A. To the fullest extent permitted by Laws and Regula-
tions, CONTRACTOR shall indemnify and hold harmless
OWNER, ENGINEER, ENGINEER's Consultants, and the
officers, directors, partners, employees, agents, and other
consultants and subcontractors of each and any of them from
and against all claims, costs, losses, and damages (including
but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or
arbitration or other dispute resolution costs) arising out of or
relating to the performance of the Work, provided that any
such claim, cost, loss, or damage:
I. is attributable to bodily injury, sickness,disease,
or death, or to injury to or destruction of tangible
property (other than the Work itself), including the loss of
use resulting therefrom; and
2. is caused in whole or in part by any negligent act
or omission of CONTRACTOR, any Subcontractor, any
Supplier, or any individual or entity directly or indirectly
employed by any of them to perform any of the Work or
anyone for whose acts any of them may be liable,
.regardless of _whether or not caused in part by any
negligence or omission of an individual or entity indem-
nified hereunder or whether liability is imposed upon such
indemnified party by Laws and Regulations regardless of
the negligence of any such individual or entity.
B. In any and all claims against OWNER or ENGINEER
or any of their respective consultants, agents, officers,
directors, partners, or employees by any employee (or the
survivor or personal representative of such employee) of
CONTRACTOR, any Subcontractor, any Supplier, or any
individual or entity directly or indirectly employed by any of
them to perform any of the Work, or anyone for whose acts
any of them may be liable, the indemnification obligation
under paragraph 6.20.A shall not be limited in any way by
any limitation on the amount or type of damages,
compensation. or benefits payable by or for CONTRACfOR
o~ any such Subcontractor, Supplier, or other individual or
entity under workers' compensation acts, disability benefit
. acts, or other employee benefit acts.
C. The indemnification:obligations of CONTRACTOR
under paragraph 6.20.A'shall not extend to the liability of
ENGINEER and ENGINEER'!i Conswtants or to the
officers, directors, partners, employees, agents, and other
consultants and subcontractors of each and any of them
arising out of:
1. the preparation or approval of, or the failure to
prepare or approve, maps, Drawings, opinions, reports,
surveys, Change Orders, designs, or Specifications; or
2. giving directions or instructions, or failiDg to
- give them, if that is the primary cause of the injury or
dafuage.
00700 - 25
TICLE 7 - OlliER WORK
Rela1ed Work aJ Site
A. OWNER may perform other work related to the
Project at the Site by OWNER's employees, or let other
direct contracts therefor, or have other work performed by
. utility owners. If such other work is not noted in the Con-
tract Documents, then:
1. written notice thereof will be given to CON-
TRACTOR prior to starting any such other work; and
2. if OWNER and CONTRACTOR are unable to
agree on entitlement to or on the amount or extent, if any,
of any adjustment in the Contract Price or Contract Times
that should be allowed as a result of such other work, a
Claim may be made therefor as provided in paragraph
10.05.
B. CONTRACTOR shall afford each other contractor
who is a party to such a direct contract and each utility owner
(and OWNER, if OWNER is performing the other work with
OWNER's employees) proper and safe access to the Site and
a reasonable opportunity for the introduction and storage of
materials and equipment and the execution of such other
work and shall properly coordinate the Work with theirs.
Unless otherwise provided in the Contract Documents, CON-
TRACTOR shall do all cutting, fitting, and patching of the
Work that may be required to prope~ly connect or otherwise
make its several parts come together and properly integrate
with such other work. CONTRACTOR shall not endanger
any work of others by cutting, excavating, or otherwise
altering their work and will pnly cut or alter their work with
the written consent of ENGINEER and the others whose
work will be affected. The duties and responsibilities of
CONTRAcroR under this paragraph are for the benefit of
such utility owners and other contractors to the extent that
there are comparable provisions for the benefit of
CONTRACTOR in said direct contracts between OWNER
and such utility owners and other contractors.
C. If the proper execution or results of any part of
CONTRACTOR's Work depends upon work performed by
others under this Article 7, CONTRACTOR shall inspect
such other work and promptly report to ENGINEER in
writing any delays, defects, or deficiencies in such other
work that render it unavailable or unsuitable for tlie proper
execution and results of CONTRACTOR's Work.
CONTRACTOR's failure -to so report will coristitute an
acceptance of such other work as fit and proper for
integration with CONTRACTOR's Work except for latent
defects and deficiencies in such other work.
7.02 Coordination
A. If OWNER intends to contract with others for the
performance of other work on the Project at the Site, the
following will be set forth in Supplementary Conditions:
I. the individual or entity who will have authority
and responsibility for coordination of the activities among
the various contractors will be identified;
2. the specific matters to be covered by such
authority and responsibility will be itemized; and
3. the extent of such authority and responsibilities
will be provided.
B. Unless otherwise provided in the Supplementary
Conditions, OWNER shall have sole authority.and respon-
sibility for such coordination.
ARTICLE 8 - OWNER'S RESPONSmILlTIES
8.01 Communicarions to Contractor
A. Except as otherwise provided in these General Condi-
tions, OWNER shall issue all communications to
CONTRACTOR through ENGINEER.
8.02 Replacemenr of ENGINEER
A. In case of termination of the employment of ENGI-
NEER, OWNER shall appoint an engineer to whom
CON1RACfOR makes no reasonable objection., whose status
under the Contract Documents shall be that of the former
ENGINEER.
8.03 Furnish Data
A. OWNER shall promptly furnish the data required of
OWNER under the Contract Documents.
8.04 Pay Promptly When Due
A. OWNER shall make payments to CONTRACTOR
promptly when they are due as provided in paragraphs
14.02.C and 14.07.C.
8.05 lAnds and Easements; Reports and Tests
J{ OWNER's duties in respect of providing lands and
easements and providing engineering surveys to establish
reference points are set forth in paragraphs 4.01 and 4.05.
Paragraph 4.02 refers to OWNER's identifying and making
available to CONTRACTOR copies of reports of explorations
00700 - 26
':](~
?)~:
II
."
r ',_,
.
and tests of subsurface conditions and drawings of physical
conditions in or relating to existing surface or subsurface
structures at or contiguous to the Site that have been utilized
by ENGINEER in preparing the Contract Documents.
8.06 Insurance
A. OWNER's responsibilities, if any, in respect to pur-
chasing and maintaining liability and property insurance are
set forth in Article 5.
8.07 Qwnge Orders
A. OWNER is obligated to execute Change Orders as
indicated in paragraph 10.03.
8.08 Inspections. Tests, and Approvals
A. OWNER's responsibility in respect to certain inspec-
tions, tests, and approvals is set forth in paragraph 13.03.B.
8.09 limitations on OWNER's Responsibilities
A. The OWNER shall not supervise, direct, or have
control or authority over, nor be responsible for,
CONTRACTOR's means, methods, techniques, sequences,
or procedures of construction, or the safety precautions and
programs incident thereto, or for any failure of CON-
TRACTOR to comply with Laws and Regulations applicable
to the performance of the Work. OWNER will not be
responsible for CONTRACTOR's failure to perform the
Work in accordance with the Contract Documents.
8.10 Undisclosed Hazardous Envirorunental Condition
A. OWNER's responsibility in respect to an undisclosed
Hazardous Environmental Condition is set forth in paragraph
4.06.
8.11 Evideru:e of Financial Arrangements
A. If and to the extent OWNER has agreed to furnish
CONTRACTOR reasonable evidence that fmanciaI
arrangements have been made to satisfy OWNER's
obligations under the Contract Documents, OWNER's
responsibility in respect thereof will be as set forth in the
Supplementary Conditions.
ARTICLE 9 - ENGINEER'S STATUS DURING
CONSTRUCTION
9.01 OWNER'S Representative
A. ENGINEER will be OWNER's representative during
the construction period. The duties and responsibilities and
the limitations of authority of ENGINEER as OWNER's
representative during construction are set forth in the
Contract Documents and will not be changed without written
consent of OWNER and ENGINEER,
9.02 Visits to Site
A. ENGINEER will make visits to the Site at intervals
appropriate to the various stages of construction as
ENGINEER deems necessary, in order to observe as an
experienced and qualified'design professional the progress
that has been made and the quality of the various aspects of
CONTRACTOR's executed Work. Based on information
obtained during such visits and observations, ENGINEER,
for the benefit of OWNER, will determine, in general, if the
Work is proceeding in accordance with the Contract
Documents. ENGINEER will not be required to make
exhaustive or continuous inspections on the Site to check the
quality or quantity of the Work. ENGINEER's efforts will
be directed toward providing for OWNER a greater degree
of confidence that the completed Work will conform
generally to the Contract Documents. On the basis of such
visits and observations, ENGINEER will keep OWNER
informed of the progress of the Work and will endeavor to
guard OWNER against defective Work.
B. ENGINEER's visits and observations are subject to
all the limitations on ENGINEER's authority and
responsibility set forth in paragraph 9.10, and particularly,
but withoU11imitation..during or.-as a result of ENGINEER's
visits or observations of CONTRACTOR's Work
ENGINEER will not supervise, direct, control, or have
authority over or be responsible for CONTRACTOR's
means, methods, techniques, sequences-: or procedures of
construction, or the safety precautions and programs incident
thereto, or for any failure of CONTRACTOR to comply with
Laws and Regulations applicable to the performance of the
Work.
9.03 Projed Represemative
A. If OWNER and ENGINEER agree, ENGINEER will
furnish a Resident Project Representative to ~ist
ENqINEER in providing more extensive observation of the
Work. The responsibilities and authority and limitations
thereon of any such Resident Proj~ Representative and
assistants will be as provided in paragraph 9.10 and in the
Supplementary Conditj~ns. If OWNER designates another
00700 - 27
~
II
I
I
I
-
representative or agent to represent OWNER at the Site who
is not ENGINEER's Consultant, agent or employee, the
responsibilities and authority and limitations thereon of such
other individual or entity will be as provided in the Supple-
mentary Conditions.
9.04 Clarifica/ions and InJerpretations
A. ENGINEER will issue with reasonable promptness
such written clarifications or interpretations of the require-
ments of the Contract Documents as ENGINEER may deter-
mine necessary, which shall be consistent with the intent of
and reasonably inferable from the Contract Documents. Such
written clarifications and interpretations will be binding on
OWNER and CONTRACTOR. If OWNER and CON-
TRACTOR are unable to agree on entitlement to or on the
amount or extent, if any, of any adjustment in the Contract
Price or Contract Times, or both, that should be allowed as
a result of a written clarification or interpretation. a Claim
may be made therefor as provided in paragraph 10.05.
9.05 Authorized Variations in Work
A. ENGINEER may authorize minor variations in the
Work from the requirements of the Contract Documents
which do not involve an adjustment in the Contract Price or
the Contract Times and are compatible with the design
concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be
accomplished by a Field Order and will be binding on
OWNER and also on CONTRACTOR, who shall perform
the Work involved promptly. If OWNER and CONTRAC-
TOR are unable to agree on entitlement to or on the amount
or extent, if any, of any adjustment in the Contract Price or
Contract Times, or both, as a result of a Field Order, a
Claim may be made therefor as provided in paragraph 10.05.
9.06 Rejecting Defective Work
A. ENGINEER will have authority to disapprove or
reject Work which ENGINEER believes to be defective, or
that ENGINEER believes will not produce a completed
Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed
Project as a functioning whole as indicated by the Contract
Documents. ENGINEER will also have authority to require
special inspection or testing of the Work as provided in
paragraph 13.04, whether or not the Work is fabricated,
installed, or completed.
9.07 Shop Drawings, Oi.!mge Orders and Payments
A. In connection with ENGINEER's authority as to Shop
Drawings and Samples, see paragraph 6.17.
00700 - 28
B. In connection with ENGINEER's authority as to
Change Orders, see Articles 10, II, and 12.
C. In connection with ENGINEER's authority as to
Applications for Payment, see Article 14.
9.08 Determinarionsfor Unit Price Work
A. ENGINEER will determine the actual quantities and
classifications of Unit Price Work perfonned by
CONTRACTOR. ENGINEER will review with CON-
TRACTOR the ENGINEER's preliminary determinations on
such matters before rendering a written decision thereon (by
recommendation of an Application for Payment or
otherwise). ENGINEER's written decision thereon will be
fmal and binding (except as, modified by ENGINEER to
reflect changed factual conditions or more accurate data)
upon OWNER and CONTRACTOR, subject to the
provisions of paragraph 10.05.
9.09 Decisions on Requiremenls of Contract Documenls
and Acceptability of Work
A. ENGINEER will be the initial interpreter of the
requirements of the Contract Documents and judge of the
acceptability of the Work thereunder. Claims, disputes and
other matters relating to the acceptability of the Work, the
quantities and classifications of Unit Price Work, the
interpretation of the requirements of the Contract Documents
pertaining to the performance of the Work, and Claims
seeking changes in the Contract Price or Contract Times will
be referred initially to ENGINEER in writing; in accordance
with the provisions of paragraph 10.05, with a request for a
formal decision.
B. When functioning as interpreter and judge under this
paragraph 9.09, ENGINEER will not show partiality to
OWNERof'CONTRACfOR 'Jind will not be liable in
connection with any interpretation or decision rendered in
good faith in such capacity. The Tendering of a decision by
ENGINEER pursuant to this paragraph 9.09 with respect to
any such Claim, dispute, or other matter (except any which
have been waived by the making or acceptance of final
payment as provided in paragraph 14.07) will be a condition
precedent to any exercise by OWNER or CONTRACTOR of
such rights or remedies as either may otherwise have under
the Contract Documents or by Laws or Regulations in respect
of any such Claim, dispute, or other matter.
9.10 Umita/ions on ENGINEER's Authority and Respon-
sibilities .
,.
A. Neither ENGINEER's authority or responsibility
under this Article 9 or under any other provision of the
Contract Documents nor any decision made by ENGINEER
in good faith either to exercise or not exercise such authority
II
II
I
Ii
II
II
or responsibility or the undertaking, exercise, or performance
of any authority or responsibility by ENGINEER shall create,
impose, or give rise to any duty in contract, tort, or
otherwise owed by ENGINEER to CONTRACTOR, any
Subcontractor, any Supplier, any other individual or entity,
or to any surety for or employee or agent of any of them.
B. ENGINEER will nol supervise, direct, control, or
have authority over or be responsible for CONTRACTOR's
means, methods, techniques, sequences, or procedures of
construction, or the safety precautions and programs incident
thereto, or for any failure of CONTRACTOR to comply with
Laws and Regulations applicable to the performance of the
Work. ENGINEER will nol be responsible for
CONTRACTOR's failure to perform the Work in accordance
with the Contract Documents.
C. ENGINEER will not be responsible for the acts or
omissions of CONTRACTOR or of any Subcontractor, any
Supplier, or of any other individual or entity performing any
of the Work.
D. ENGINEER's review of the fmal Application for
Payment and accompanying documentation and all mainte-
nance and operating insuuctions, schedules, guarantees,
Bonds, certificates of inspection, tests and approvals, and
other documentation required to be delivered by paragraph
14.07.A will only be to determine generally that their content
complies with the requirements of, and in the case of
certificates of inspections, tests, and approvals that the results
certified indicate compliance with, the Contract Documents.
E. The limitations upon authority and responsibility set
forth in this paragraph 9.10 shall also apply to ENGINEER's
Consultants, Resident Project Representative, and assistants.
ARTICLE 10 - CHANGES IN THE WORK; CLAIMS
10.01 AuJlwrized Changes in the Work
A. Without invalidating the Agreement and without
notice to any surety, OWNER may, at any time or from time
to time, order additions, deletions, or revisions in the Work
by a Written Amendment, a Change Order, or a Work
Change Directive. Upon receipt of any such document,
CONTRACTOR shall promptly proceed with the Work
involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise
specifically provided).
B. If OWNER and CONTRACfOR are unable to agree
on entitlement to, or on the amount or extent, if any, of an
adjustment in the Contract Price or Contract Times, or both,
that should be allowed as a result of a Work Change
00700 - 29
Directive, a Claim may be made therefor as provided in
paragraph 10.05.
10.02 Unautlwrized Changes in the Work
A. CONTRACTOR shall not be entitled to an increase
in the Contract Price or an extension of the Contract Times
with respect to any work performed that is not required by
the Contract Documents as amended, modified, or
supplemented as provided in paragraph 3.04, except in the
case of an emergency as provided in paragraph 6.16 or in the
case of uncovering Work as provided in paragraph 13.04. B.
10.03 Execution of Change Orders
A. OWNER and CONTRACTOR shall execute
appropriate Change Orders recommended by ENGINEER (or
Written Amendments) covering:'
1. changes in the Work which are: (i) ordered by
OWNER pursuant to paragraph 1O.01.A, (ii) required
because of acceptance of defective Work under para-
graph 13.08.A or OWNER's correction of defective
Work under paragraph 13.09, or (iii) agreed to by the
parties;
2. changes in the Contract Price or Contract Times
which are agreed to by the parties, including any
undisputed sum or amount of time for Work actually
performed in .t:cordance with a Work Change Directive;
and
3. changes in the Contract Price or Contract Times
which embody the substance of any written decision
rendered by ENGINEER pursuant to paragraph 10.05;
provided that, in lieu of executing any such Change
Order, an appeal may be taken from any such decision
in accordance with the .provisions of the Contract
_ Documents and applicable Laws and Regulations, but
during any such appeal, CONTRACTOR shall carry on
the Work and adhere. to the progress schedule as
provided in paragraph 6.18.A. -
10.04 Notification to Surety
A. If notice of any change affecting the general scope
of the Work or the provisions of the Contract Documents
(including, but not limited to, Contract Price or Contract
Times) is required by the provisions of any Bond to be given
to a surety, the giving of any such notice will be
CONTRACTOR's responsibility. The amount of each
appli~le Bond will be adjusted to reflect the effect of any
such change.
t~;:
~
I'
I
I
I
10.05 Claims and Dispules
A. Notice: Written notice stating the general nature of
each Claim, dispute, or other matter shall be delivered by the
claimant to ENGINEER and the other party to the Contract
promptly (but in no event later than 30 days) after the start of
the event giving rise thereto. Notice of the amount or extent
of the Claim, dispute, or other matter with supporting data
shall be delivered to the ENGINEER and the other party to
the Contract within 60 days after the start of such event
(unless ENGINEER allows additional time for claimant to
submit additional or more accurate data in support of such
Claim, dispute, or other matter). A Claim for an adjustment
in Contract Price shall be prepared in accordance with the
provisions of paragraph 12.01.8. A Claim for an adjustment
in Contract Time shall be prepared in accordance with the
provisions of paragraph 12.02.8. Each Claim shall be
accompanied by claimant's written statement that the adjust-
ment claimed is the entire adjustment to which the claimant
believes it is entitled as a result of said event. The opposing
party shall submit any response to ENGINEER and the
claimant within 30 days after receipt of the claimant's last
submittal (unless ENGINEER allows additional time).
8. ENGINEER's Decision: ENGINEER will render
a fonnal decision in writing within 30 days after receipt of
the last submittal of the claimant or the last submittal of the
opposing party, if any. ENGINEER's written decision on
such Claim, dispute, or other matter will be final and binding
upon OWNER and CONTRACTOR unless:
1. an appeal from ENGINEER's decision is taken
within the time limits and in accordance with the dispute
resolution procedures set forth in Article 16; or
2. if no such dispute resolution procedures have
been set forth in Article 16, a written notice of intention
to appeal from ENGINEER's written decision is
delivered by OWNER or CONTRACTOR to the other.
and to ENGINEER within 30 days after the date of-such
decision, and a formal proceeding is instituted by the
appealing party in a. forum of competent jurisdiction
within 60 days after the date of such decision or within
60 days after Substantial Completion, whichever is later
(unless otherwise agreed in writing by OWNER and
CONTRACTOR), to exercise such rights or remedies as
the appealing party may have with respect to such
Claim, dispute, or other matter in accordance with
applicable Laws and Regulations.
C. If ENGINEER does not render a formal decision in
writing within the time -stated in paragraph IO.OS.B, a
decision denying the Claim. in its entirety shall be deemed to
have been issued 31 days after receipt of the last submittal of
the claimant or the last submittal of the opposing party, if
any.
00700 . 30
D. No Claim for an adjustment in Contract Price or
Contract Times (or Milestones) will be valid if not submitted
in accordance with this paragraph 10.05.
ARTICLE 11 - COST OF THE WORK; CASH
ALLOWANCES; UNIT PRICE WORK
11.01 Cost of the Work
A. Costs Included: The term Cost of the Work means
the sum of all costs necessarily incurred and paid by CON-
TRACTOR in the proper performance of the Work. When
the value of any Work covered by a Change Order or when
a Claim for anadjusunent in Contract Price is determined on
the 'basis of Cost of the Work,the costs to be reimbursed to
CONTRACTOR will be only those additional or incremental
costs required because of the change in the Work or because
of the event giving rise to the Claim. Except as otherwise
may be agreed to in writing by OWNER, such costs shall be
in amounts no higher than those prevailing in the locality of
the Project, shall include only the following items, and shall
not include any of the costs itemized in paragraph 1I.Ol.B.
1. Payroll costs for employees in the direct employ
of CONTRACTOR in the perfonnance of the Work
under schedules of job classifications agreed upon by
OWNER and CONTRACTOR. Such employees shall
include without limitation superintendents, foremen, and
other personnel employed full time at the Site. Payroll
costs for employees not employed full time on the Work
shall be apportioned on the basis of their time spent on
the Work. Payroll costs shall include, but not be limited
to, salaries and wages plus the cost of fringe benefits,
which sIWl include social security contributions, unem-
ployment, excise, and payroll taxes, workers'
compensation, health and retirement benefits, bonuses,
. sick leave, vacation and.holiday pay applicable thereto.
The .expenses .oLpe.rforming Work outside of regular
working hours, on Saturday, Sunday, or legal holidays,
shall be included in the above to the extent authorized by
OWNER.
2. Cost of all materials and equipment furnished
and incorporated in the Work, including costs of
transportation and storage thereof, and Suppliers' field
services required in connection therewith. All cash
discounts shall accrue to CONTRACTOR unless
OWNER deposits funds with CONTRACTOR with
which to make payments, in which case the cash
~unts shall accrue to OWNER. All trade discounts,
rebates and refunds and returns from sale of surplus
materials and equipment &hall accrue to OWNER, and
CONTRACTOR &hall make provisions so that they may
be obtained.
3. Payments made by CONTRACTOR to
Subcontractors for Work performed by Subcontractors.
If required by OWNER, CONTRACTOR shall obtain
competitive bids from subcontractors acceptable to
OWNER and CONTRACTOR and shall deliver such
bids to OWNER, who will then determine, with the
advice of ENGINEER, which bids, if any, will be
acceptable. If any subcontract provides that the
Subcontractor is to be paid on the basis of Cost of the
Work plus a fee, the Subcontractor's Cost of the Work
and fee shall be determined in the same manner as
CONTRACTOR's Cost of the Work and fee as provided
in this paragraph 11.01.
4. Costs of special consultants (including but not
limited to engineers, architects, testing laboratories,
surveyors, attorneys, and accountants) employed for
services specifically related to the Work.
5. Supplemental costs including the following:
a. The proportion of necessary transportation,
travel, and subsistence expenses of
CONTRACTOR's employees incurred in discharge
of duties connected with the Work.
b. Cost, including transportation and mainte-
nance, of all materials, supplies, equipment,
machinery, appliances, office, and temporary facili-
ties at the Site, and hand tools not owned by the
workers, which are consumed in the performance of
the Work. and cost, less market value, of such items
used but not consumed which remain the property of
CONTRACTOR.
..
,.
II
I
C. Rentals of all construction equipment and
machinery, and the parts thereof whether rented
from CONlRACfOR or others in accordance with
rental agreements approved by OWNER with the
advice of ENGINEER, and the costs of
transportation, loading, unloading, assembly,
dismantling, and removal thereof. All such costs
shall be in accordance with the tenns of said rental
agreements. The rental of any such equipment, ma-
chinery, or parts sha1I cease when the use thereof is
no longer necessary for the Work.
I
I
d. Sales, consumer, use, and other similar
taxes related to the Work, and for which CON-
TRACTOR is liable, imposed by Laws and Regu-
lations. .
I
e. Deposits lost for causes other than negli-
gence of CONTRACTOR, any Subcontractor, or
anyone directly or indirectly employed by any of
them or for whose acts any of them may be liable,
I
00700 - 31
I
and royalty payments and fees for permits and
licenses.
f. Losses and damages (and related expenses).
caused by damage to the Work, not compensated by
insurance or otherwise, sustained by
CONTRACTOR in connection with the perfor-
mance of the Work (except losses and damages
within the deductible amounts of property insurance
established in accordance with paragraph 5.06.D),
provided such losses and damages have resulted
from causes other than the negligence of
CONTRACTOR, any Subcontractor, or anyone
directly or indirectly employed by any of them or
for whose acts any of them may be liable. Such
losses shall. include. settlements made with the
written consent and approval of OWNER. No such
losses, damages, and expenses shall beinc1uded in
the Cost of the. Work for the purpose of determining
CONTRACTOR's fee.
g. The cost of utilities, fuel, and sanitary
facilities at the Site.
h. Minor expenses such as telegrams, long
distance telephone calls, telephone service at the
Site, expressage, and similar petty cash items in
connection with the Work.
i. When the Cost of the Work is used to
determine the value. of a Change Order or of a
Claim, the cost of premiums for additional Bonds
and insurance required because of the changes in the
Work or caused by the event giving rise to the
Claim.
j. When all the Work is performed on the
basis of cost-plus, the costs of premiums for all
Bonds and insw'ance CONTRACTOR is required by
the Contract -Documents to purchase and maintain.
B. Costs Excluded: The term Cost or the Work shall
not include any of the following items:
I. Payroll costs and other compensation of
CONTRACTOR's officers, executives, principals (of
partnerships and sole proprietorships), general manag-
ers, engineers, architects, estimators, attorneys, audi-
tors, accountants, purchasing and contracting agents,
expediters, timekeepers, clerks, and other personnel
employed by CONTRAcroR., whether 81 the Site or in
CQNlRAcroR', principal or branch office for general
administration of the Work and not specifically included
in the agreed upon schedule of. job classifications
referred to in paragraph 11.01.A.l or specifically
covered by paragraph 11.01 ~.4, all of which are to be
-
I
I
I
I
considered administrative costs covered by the
CONTRACTOR's fee.
2. Expenses of CONTRACTOR's principal and
branch offices other than CONTRACTOR's office at the
Site.
3. Any part of CONTRACTOR's capital expenses,
including interest on CONTRACTOR's capital employed
for the Work and charges against CONTRACTOR for
delinquent payments.
4. Costs due to the negligence of CONTRACTOR,
any Subcontractor, or anyone directly or indirectly
employed by any of them or for whose acts any of them
may be liable, including but not limited to, the
correction of defective Work, disposal of materials or
equipment wrongly supplied, and making good any
damage to property.
5. Other overhead or general expense costs of any
kind and the costs of any item not specifically and
expressly included in paragraphs 11.01.A and 11.01.B.
C. CONTRACTOR's Fee: When all the Work is
performed on the basis of cost-plus, CONTRACTOR's fee
shall be determined as set forth in the Agreement. When the
value of any Work covered by a Change Order or when a
Claim for an adjustment in Contract Price is determined on
the basis of Cost of the Work, CONTRACTOR's fee shall be
determined as set forth in paragraph 12.01.C.
D. Documentation: Whenever the Cost of the Work for
any purpose is to be determined pursuant to paragraphs
11.01.A and 11.01.B, CONTRACTOR will establish and
maintain records thereof in accordance with generally
accepted accounting practices and submit in a form
acceptable to ENGINEER an itemized cost breakdown.
together with supporting data.
11.02 Cash Allowances
A. It is understood that CONTRACTOR has included
in the Contract Price all allowances so named in the Contract
Documents and shall cause the Work so covered to be
performed for such sums as may be acceptable to OWNER
and ENGINEER. CONTRACTOR agrees that:
1. the allowances include the cost to CONTRAC-
TOR (less any applicable trade discounts) of materials
and equipment required by the allo,,!ances to be
delivered at the Site, and all applicable taxes; and
2. CONTRACTOR's costs for unloading and
harviline on the Site, labor, installation costs, overhead,
profit, r:1 other expenses contemplated for the allow-
ances have been included in the Contract Price and not
in the allowances, and no demand for additional payment
on account of any of the foregoing will be valid.
B. Prior to fmal payment, an appropriate Change Order
will be issued as recommended by ENGINEER to reflect
actual amounts due CONTRACTOR on account of Work
covered by allowances, and the Contract Price shall be
correspondingly adjusted.
11.03 Unit Price Work
A. Where the Contract Documents provide that all or
part of the Work is to be Unit Price Work, initially the
Contract Price will be deemed to include for all Unit Price
Work.an amount equal to the.sum of the unit price for each
separately identified item of Unit Price Work times the
estimated quantity of each .item as indicated in the Agree-
ment. The estimated quantities of items of Unit Price Work
are not guaranteed and are solely for the purpose of
comparison of Bids and determining an initial Contract Price.
Determinations of the actual quantities and classifications of
Unit Price Work performed by CONTRACTOR will be
made by ENGINEER subject to the provisions of paragraph
9.08.
B. Each unit price will be deemed to include an amount
considered by CONTRACTOR to be adequate to cover
CONTRACTOR's overhead and profit for each separately
identified item.
C. OWNER or CONTRACTOR may make a Claim for
an adjustment in the Contract Price in accordance with
paragraph 10.05 if:
1. the quantity of any item of Unit Price Work
performed by CONTRACTOR differs materially and
_. significantly :from: the:estimated quantity of such item
indicated in the Agreement; and
2. there is no corresponding adjustment with
respect any other item of Work; and
3. if CONTRACTOR believes that
CONTRACTOR is entitled to an increase in Contract
Price as a result of having incurred additional expense or
OWNER believes that OWNER is entitled to a decrease
in Contract Price and the parties are unable to agree as
to the amount of any such increase or decrease.
,
00700 - 32
ARTICLE 12 - CHANGE OF CONTRACT PRICE;
CHANGE OF CONTRACT TIMES
12.0 I Change of Coruract Price
A. The Contract Price may only be changed by a
Change Order or by a Written Amendment. Any Claim for
an adjustment in the Contract Price shall be based on written
notice submitted by the party making the Claim to the
ENGINEER and the other party to the Contract in accor-
dance with the provisions of paragraph 10.05.
B. The value of any Work covered by a Change Order
or of any Claim for an adjustment in the Contract Price will
be determined as follows:
1. where the Work involved is covered by unit
prices contained in the Contract Documents, by applica-
tion of such unit prices to the quantities of the items
involved (subject to the provisions of paragraph 11.03 );
or
2. where the Work involved is not covered by unit
prices contained in the Contract Documents, by a
mutually agreed lump sum (which may include an
allowance for overhead and profit not necessarily in
accordance with paragraph 12.01.C.2); or
3. where the Work involved is not covered by unit
prices contained in the Contract Documents and agree-
ment to a lump sum is not reached under paragraph
12.01.B.2, on the basis of the Cost of the Work
(determined as provided in paragraph 11.01) plus a
CONTRACTOR's fee for overhead and profit (deter-
mined as provided in paragraph 12.01.C).
C. CONTRACI'OR's Fee: The CONTRACTOR's fee
for overhead and profit shall be determined as follows:
1. a mutually acceptable fixed fee; or
2. if a fixed fee is not agreed upon, then a fee
based on the following percentages of the various
portions of the Cost of the Work:
a. for costs incurred under paragraphs
1 1.0 LA. 1 and 11.01.A.2, the CONTRACTOR's
fee shall be 15 percent;
b. for costs incurred under paragraph
11.01.A.3, the CONTRACTOR's fee shall be five
percent;
c. where one or more tierS of subcontracts are
on the basis of Cost of the Work plus a fee and no
fixed fee is agreed upon, the intent of paragraph
12.01.C.2.a is that the Subcontractor who actually
performs the Work, at whatever tier, will be paid
a fee of 15 percent of the costs incurred by such
Subcontractor under paragraphs 11.01.A.l and
11.01.A.2 and that any higher tier Subcontractor
and CONTRACTOR will each be paid a fee of five
percent of the amount paid to the next lower tier
Subcontractor;
d. no fee shall be payable on the basis of costs
itemized under paragraphs 11.01.AA, 11.01.A.5,
and l1.01.B;
e. the amount of credit to be allowed by
CONTRACTOR to OWNER for any change which
results in a net decrease in cost will be the amount
of the actual net decrease in cost plus a deduction in
CONTRACTOR's fee by an amount equal to five
percent of such net decrease; and
f. when both additions and credits are in-
volved in anyone change, the adjustment in
CONTRACTOR's fee shall be computed on the
basis of the net change in accordance with para-
graphs 12.01.C.2.a through 12.01.C.2.e, inclu-
sive.
12.02
Change of Coruract Times
A. The Contract Times (or Milestones) may only be
changed by a Change Order or by a Written Amendment.
Any Claim for an adjustment in the Contract Times (or
Milestones) shall be based on written notice submitted by the
party making the claim to the ENGINEER and the 'other
party to the Contract in accordance with the provisions of
paragraph 10.05.
B. Any adjustment of the Contract Times (or
Milestones) covered by a Change Order or of any Claim for
an adjustment in the Contract Times (or Milestones) will be
determined in accordance with 'the provisions of this
Article 12.
12.03 Delays Beyond CONTRACI'OR's Control
A. Where CONTRACTOR is prevented from
completing any part of the Work within the Contract Times
(or Milestones) due to delay beyond the control of
CONTRACI'OR, the Contract Times (or Milestones) will be
extended in an amount equal to the time lost due to such
delay if a Claim is made therefor as provided in paragraph
12.02.A. Delays beyond the control of CONTRACTOR
shall include, but not be limited to, 1lCtS or neglect by
OWNER, acts or neglect of utility owners or other
contractors performing other work b contemplated by
00700 - 33
Article 7, fires, floods, epidemics, abnormal weather
conditions, or acts of God.
12.04 Delays Wi/hin CONlRACTOR's Con/rol
A. The Contract Times (or Milestones) will not be
extended due to delays within !.he control of
CONTRACTOR. Delays attributable to and wi!.hin the
control of a Subcontractor or Supplier shall be deemed to be
delays within the control of CONTRACTOR.
12.05 Delays Beyond OWNER's and CONlRACTOR's
Con/rol
A. Where CONTRACTOR is prevented from complet-
ing any part of the Work wi!.hin the Contract Times (or
Milestones) due to delay beyond !.he control of bo!.h OWNER
and CONTRACfOR, an extension of the Contract Times (or
Milestones) in an amount equal to the time lost due to such
delay shall be CONTRACTOR's sole and exclusive remedy
for such delay.
12.06 Delay Damages
A. In no event shall OWNER or ENGINEER be liable
to CONTRACTOR, any Subcontractor, any Supplier, or any
other person or organization, or to any surety for or
employee or agent of any of them, for damages arising out of
or resulting from:
1. delays caused by or within the control of CON-
TRACTOR; or
2. delays beyond the control of both OWNER and
CONTRACfOR including but not limited 10 fires,
floods, epidemics: abnormal weather conditions, acts of
God, or acts or neglect by utility owners or other
contractors perfo!lJling other work as contemplated by
Article 7.
B. Nothing in this paragraph 12.06 bars a change in
Contract Price pursuant to this Article 12 to compensate
CONTRACTOR due to delay, interference, or disruption
directly attributable to actions or inactions of OWNER or
anyone for whom OWNER is responsible.
ARTICLE 13 - TESTS AND INSPECTIONS;
CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
13.01 Notice of Defects
A. Prompt. notice of all defective Work of which
OWNER or ENGINEER has actuallcnowledge will be given
to CONTRACTOR. All defective Work may be rejected,
corrected, or accepted as provided in this Article 13.
13.02 Access /0 Work
A. OWNER, ENGINEER, ENGINEER's Consultants,
other representatives and personnel of OWNER, independent
testing laboratories, and governmental agencies with
jurisdictional interests will have access to the Site and the
Work at reasonable times for their observation, inspecting,
and testing. CONTRACTOR shall provide them proper and
safe conditions for such access and advise them of
CONTRACTOR's Site safety procedures and programs so
that they may comply therewith as applicable.
13.03 Tests and Inspections
A. CONTRACTOR shall give ENGINEER timely
notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and
testing personnel to facilitate required inspections or tests.
B. OWNER shall employ and pay for the services of an
independent testing laboratory to perform all inspections,
tests, or approvals required by the Contract Documents
except:
1. for inspections, tests, or approvals covered by
paragraphs 13.03.C and 13.03.D below;
2. that costs incurred in connection with tests or
inspections conducted pursuant to paragraph 13.04.B
shall be paid as provided in said paragraph 13.04.B; and
3. as otherwise specifically provided in the Con-
tract Documents.
C. If Laws or Regulations of any public body having
. jurisdiction require any Work (or part thereof) specifically to
be inspected, -tested, or approved by an employee or other
representative of such public body, CONTRACTOR shall
assume full responsibility for arranging and obtaining such
inspections, tests, or approvals, pay all costs in connection
therewith, and furnish ENGINEER the required certificates
of inspection or approval.
D. CONTRACTOR shall be responsible for arranging
and obtaining and shall pay all costs in connection with any
inspections, tests, or approvals required for OWNER's and
ENGINEER's accep~ce.of materials or equipment to be
incorporated in the Work;- or acceptance of materials, mix
desfgns, or equipment submitted for approval prior to
CONTRACTOR's purchase thereof for incorporation in the
Work. Such inspections, tests, or approvals shaIl be
performed by organizations acceptable to OWNER and
ENGINEER.
00700 - 34
B. If ENGINEER considers it necessary or advisable
that covered Work be obsexved by ENGINEER or inspected
or tested by others, CONTRACTOR, at ENGINEER's
request, shall uncover, expose, or otherwise make available A. If within one year after the date of Substantial
for observation, inspection, or testing as ENGINEER may Completion or such longer period of time as may be
require, that portion of the Work in question, furnishing all prescribed by Laws or Regulations or by the terms of any
necessary labor, material, and equipment. If it is found that applicable special guarantee required by the Contract
such Work is defective, CONTRACTOR shall pay all Documents or by any specific provision of the Contract
Claims, costs, losses, and damages (including but not limited Documents, any Work is found to be defective, or if the
to all fees and charges of engineers, architects, attorneys, and repair of any damages to the land or areas made available for
other professionals and all court or arbitration or other CONTRACTOR's use by OWNER or permitted by Laws and
dispute resolution costs) arising out of or relating to such Regulations as contemplated in paragraph 6.11.A is found to
uncovering, exposure, obsexvation, inspection, and testing, be defective, CONTRACTOR shall promptly, without cost
and of satisfactory replacement or reconstruction (including to OWNER and in accordance with OWNER's written
but not limited to all costs of repair or replacement of work instructions: (i) repair such defective land or areas, or (ii)
of others); and OWNER shall be entitled to an appropriate correct such defective Work or, if the defective Work bas
decrease in the Contract Price. If .the parties are unable to been rejected by OWNER. remove it from the Projec:t. and
agn:e as to the amount thereof, OWNER may make a Claim replace it with Work that is not defective. and (ill) satisfac-
therefor as provided in paragraph 10.05. If. however. such ....torily correct or.repairor remove:and replace any damage to
Worle is not found to be defective, CONTRACTOR shall be otherWorlc, to the.worle~t)f.others or other land or ~eas
allowed an increase in the Contract Price or an extension'of ..resulting therefrom.lfC.0NTRACTOR does not promptly
. the Contract Times (or Milestones), or both. directlyattribut- comply with the terms of such instructions, or in an
able to such uncovering, exposure, obsexvation. inspection, emergency where delay would cause serious risk of loss or
testing, replacement, and reconstruction. If the parties are damage, OWNER may have the defective Work corrected or
unable to agree as to the amount or extent thereof, repaired or may have the rejected Work removed and
CONTRACTOR may make a Claim therefor as provided in replaced, and all Claims, costs, losses, and damages
paragraph 10.05. (including but not limited to all fees and charges of
engineers. architects. attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
arising out of or relating to such correction or repair or such
removal and replacement (including but not limited to all
costs of repair or rep1acemem of work of others) will be paid
by CONTRACTOR. -
I
I
I
-
E. If any Work (or the work of others) thjl.t is to be
inspected, tested, or approved is covered by CON'TRACTOR
without written concurrence of ENGINEER, it must, if
requested by ENGINEER, be uncovered for observation.
F. Uncovering Work as provided in paragraph 13.03.E
shall be at CONTRACTOR's expense unless CON-
TRACTOR has given ENGINEER timely notice of
CONTRACTOR's intention to cover the same and ENGI-
NEER has not acted with reasonable promptness in response
to such notice.
I
I
13.04 Uncovering Work
A. If any Work is covered contrary to the written
request of ENGINEER, it must, if requested by ENGINEER,.
be uncovered for ENGINEER's observation and replaced at
CONTRACTOR's expense.
I
I
I
I
I
I
I
I
I
I
OWNER May Stop the Work
13.05
Ii
A. If the Work is defective, or CONTRACTOR fails to
supply sufficient sldlled workers or suitable materials or
equipment. or fails to perform the Work in such a way that
the completed Work will conform to the Contract
Documents, OWNER may order CONTRACTOR to stop the
Work, or any portion thereof, until the cause for such order
has been eliminated; however, this right of OWNER to stop
Ii
I
the Work shall not give rise to any duty on the part of
OWNER to exercise this right for the benefit of
CONTRACTOR, any Subcontractor, any Supplier, any other
individual or entity, or any surety for, or employee or agent
of any of them.
13.06 Correction or Removal of Defective Work
A. CONTRACTOR shall correct all defective Work,
whether or not fabricated, installed, or completed, or, if the
Work has been rejected by ENGINEER, remove it from the
Project and replace it with Work that is not defective.
CONTRACTOR shall pay all Claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers. architects, attorneys, and other professionals and
aU court. or arbitration or other dispute resolution costs)
. arising out of or relating to.such correction or removal
(including but not limited to all costs of repair orreplacement
of work of others).
13.07
Correction Period
B. In special circumstances wher~ a particular item of
equipment is placed in continuous service before Substantial
Completion of all the Work, the correc~:')n period for that
00700 - 35
item may start to run from an earlier date if so provided in
the Specifications or by Written Amendment.
C. Where defective Work (and damage to other Work
resulting therefrom) has been corrected or removed and
replaced under this paragraph 13.07, the correction period
hereunder with respect to such Work will be extended for an
additional period of one year after such correction or removal
and replacement has been satisfactorily completed.
D. CONTRACTOR's obligations under this paragraph
13.07 are in addition to any other obligation or warranty.
The provisions of this paragraph 13.07 shall not be construed
as a substitute for or a waiver of the provisions of any
applicable statute of limitation or repose.
13.08 Acceptance of Defective Work
I
A. If, instead of requiring correction or removal and
replacement of defective Work, OWNER (and, prior to
ENGINEER's recommendation of fmal payment,
ENGINEER) prefers to accept it, OWNER may do so.
CONTRACTOR shall pay all Claims, costs, losses, and
damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and
all court or arbitration or other dispute resolution costs)
attributable to OWNER's evaluation of and determination to
accept such defective Work (such costs to be approved by
ENGINEER as to reasonableness) and the diminished value
of the Work to the extent not otherwise paid by
CONTRACTOR pursuant to this sentence. If any such
acceptance occurs prior to ENGINEER's recommendation of
fmal payment, a Change Order will be issued incorporating
the necessary revisions in the Contract Documents with
respect to the Work. and OWNER shall be entitled to an
appropriate decrease i1i the Contract Price, reflecting the
diminh:hed value of Work so accepted. If the parties are
unable to agree as to the amount thereof. OWNER may make
a Claim therefor as provided in paragraph 10.05. If the
acceptance occurs after such recommendation, an appropriate
amount will be paid by CONTRACTOR to OWNER.
I
I
I
I
I
13.09 OWNER May Correct Defective Work
A. If CONTRACTOR fails within a reasonable time
.after written notice from ENGINEER to correct defective
Work or to remove and replace rejected Work as required by
ENGINEER in accordance with paragraph 13.06.A. or if
CONTRACTOR fails to perform the Work in accordance
with the Contract Documents. or if CONTRACTOR fails to
comply with any other P!'ovision of the Contract Documents,
OWNER may. after seven days written notice to
CONTRACTOR, correct and remedy any such deficiency.
I
I
Ii
B. In exercising the rights and remedies under this
paragraph. OW N'ER &hall proceed expeditiously. In
Ii
/
./
connection with such corrective and remedial action,
OWNER may exclude CONTRACTOR from all or part of
the Site, take possession of all or part of the Work and
suspend CONTRACTOR's services related thereto, take
possession of CONTRACTOR's tools, appliances, con-
struction equipment and machinery at the Site, and incorpo-
rate in the Work all materials and equipment stored at the
Site or for which OWNER has paid CONTRACTOR but
which are stored elsewhere. CONTRACTOR shall allow
OWNER, OWNER's representatives, agents and employees,
OWNER's other contractors, and ENGINEER and
ENGINEER's Consultants access to the Site to enable
OWNER to exercise the rights and remedies under this
paragraph.
C. All Claims, costs, losses, and damages (including
but not limited to all fees and charges of engineers,
architects, attorneys. and other. professionals and all court or
arbitration or other dispute resolution costs) incurred or
sustained by OWNER in exercising the rights and remedies
under this paragraph 13.09 will be charged against CON-
TRACTOR, and a Change Order will be issued incorporating
the necessary revisions in the Contract Documents with
respect to the Work; and OWNER shall be entitled to an
appropriate decrease in the Contract Price. If the parties are
unable to agree as to the amount of the adjustment, OWNER
may make a Claim therefor as provided in paragraph 10.05.
Such claims, costs, losses and damages will include but not
be limited to all costs of repair. or replacement of work of
others destroyed or damaged by correction, removal, or
replacement of CONTRACTOR's defective Work.
D. CONTRACTOR shall not be allowed an extension
of the Contract Times (or Milestones) because of any delay
in the performance of the Work attributable to the exercise by
OWNER of OWNER.s rights and remedies under this
paragraph 13.09.
ARTICLE 14 -" PAYMENTS TO CONTRACTOR AND
COMPLETION
14.01 Schedule of Values
A. The schedule of values established as provided in
paragraph 2.07.A will serve as the basis for progress
payments and will be incorporated into a form of Application
for Payment acceptable to ENGINEER. Progress payments
on account of Unit Price Work will be based on the number
of units completed.
l'
00700 - 36
14.02 Progress Paymen/s
A. Applications for Payments
1. At least 20 days before the date established for
each progress payment (but not more often than once a
month), CONTRACTOR shall submit to ENGINEER
for review an Application for Payment filled out and
signed by CONTRACTOR covering the Work
completed as of the date of the Application and
accompanied by such supporting documentation as is
required by the Contract Documents. If payment is
requested on the basis of materials and equipment not
incorporated in the Work but delivered and suitably
stored at the Site or at another location agreed to in
writing, the Application for Payment shall also be
accompanied by a bill of sale, invoice, or other docu-
mentation warranting that OWNER has received the
materials and equipment free and clear of all Liens and
evidence that the materials and equipment are covered
by appropriate property insurance or other arrangements
to protect OWNER's interest therein, all of which must
be satisfactory to OWNER.
i.
,
(
-
-
-
-
I
, I
2. Beginning with the second Application for
Payment, each Application shall include an affidavit of
CONTRACTOR stating that all previous progress
payments received on account of the Work have been
applied on account to discharge CONTRACTOR's
legitimate obligations associated with prior Applications
for Payment.
I
I
,
3. The amount of retainage with respect to pro-
gress payments will be as stipulated in the Agreement.
I
B. Review of Applications
I
1. ENGINEER will, within 10 days after receipt of
each Application for Payment, either indicate in writing
a recommendation of payment and present. the
Application to OWNER or return the Application to
CONTRACTOR indicating in writing ENGINEER's
reasons for refusing to recommend payment. In the
latter case, CONTRACTOR may make the necessary
corrections and resubmit the Application.
I
I
I
2. ENGINEER's recommendation of any payment
requested in an Application for Payment will constitute
a representation by ENGINEER to OWNER, based on
ENGINEER's observations on the Site of the executed
Work as an'experienced and qualified design profession-
al and on ENGINEER's review of the Application for
Payment and the accompanying data and schedules, that
to the best of ENGINEER's 1cnowledge, information and
belief:
I
I
I
00700 - 37
a. the Work has progressed to the point
indicated;
b. the quality of the Work is generally in
accordance with the Contract Documents (subject to
an evaluation of the Work as a functioning whole
prior to or upon Substantial Completion, to the
results of any subsequent tests called for in the
Contract Documents, to a final determination of
quantities and classifications for Unit Price Work
under paragraph 9.08. and to any other
qualifications stated in the recommendation); and
c. the conditions precedent to
CONTRACTOR's being entitled to such payment
appear to have been fulfilled in so far as it is
ENGINEER's responsibility to observe the Work.
3. By recommending any such payment ENGI-
NEER will not thereby be deemed to have represented
that: (i) inspections made to check the quality or the
quantity of the Work as it has been performed have been
exhaustive, extended to every aspect of the Work in
progress, or involved detailed inspections of the Work
beyond the responsibilities specifically assigned to
ENGINEER in the Contract Documents; or (ii) that
there may not be other matters or issues between the
parties that might entitle CONTRACTOR to be paid
additionally by OWNER or entitle OWNER to withhold
payment to CONTRACTOR.
4. Neither ENGINEER's review of
CONTRACTOR's Work for the purposes of recom-
mending payments nor ENGINEER's recommendation
of any payment, including final payment, will impose
responsibility on ENGINEER to supervise, direct, or
control the Work or for the means, methods, techniques,
'_ sequences,'orprocedures of.constructio~ or the safety
:.' precautions and programs. incident thereto, or for CON-
TRACTOR's failure to:comply with Laws and Regu-
lations applicable to CONTRACTOR's performance of
the Work. Additionally, said review or recommendation
will not impose responsibility on ENGINEER to make
any examination to ascertain how or for what purposes
CONTRACTOR has used the moneys paid on account of
the Contract Price, or to determine that title to any of
the Work, materials, or equipment has passed to
OWNER free and clear of any Liens.
5. ENGINEER may refuse to recommend the
whole or any part of any payment if, in ENGINEER's
opinion, it would be incorrect to make the representa-
tions to OWNER referred to in paragraph 14.02.B.2.
ENGINEER may also refuse to recommend any such
payment or, because of subsequently discovered
evidence or the results of subsequent ::lSpections or tests,
revise or revoke any such payment recommendation
previously made, to such extent as may be necessary in
ENGINEER's opinion to protect OWNER from loss
because:
a. the Work is defective, or completed Work
has been damaged, requiring correction or replace-
ment;
b. the Contract Price has been reduced by
Written Amendment or Change Ordcrs;
c. OWNER has been required to correct
defective Work or complete Work in accordance
with paragraph 13.09; or
d. ENGINEER has actual knowledge of .the
occurrence of any of the events enumerated in para-
graph 15.02.A.
C. Paymen/ Becomes Due
I. Ten days after presentation of the Application
for Payment to OWNER with ENGINEER's recom-
mendation, the amount recommended will (subject to the
provisions of paragraph 14.02.D) become due, and when
due will be paid by OWNER to CONTRACTOR.
D. Reduction in Payment
1. OWNER may refuse to make payment of the
full amount recommended by ENGINEER because:
a. claims have been made against OWNER on
account of CONTRACTOR's performance or fur-
nishing of the Work;
b. Liens have been filed in connection with.the--
Work, except where CONTRACTOR bas delivered
a specific Bond satisfactory to OWNER to secure
the satisfaction and discharge of such Liens;
c. there are other items entitling OWNER to
a set-off against the amount recommended; or
L....
~
,
.
,
-
-
d. OWNER bas actual knowledge of the occur-
rence of any of the events enumerated in paragraphs
14.02.B.5.a through 14.02.B.5.c or paragraph
15.02.A.
2. If OWNER. refuses to make payment of the full
amount recommended by ENGINEER, OWNER must
give CONTRACTOR immediate written notice (with a
copy to ENGINEER) stating the reasons for such action
and promptly pay CONTRACTOR any amount
rem:lining aftt.. deduction of the amount so withheld.
I
/
/
OWNER shall promptly pay CONTRACTOR the
amount so withheld, or any adjusunent thereto agreed to
by OWNER and CONTRACTOR, when CONTRAC-
TOR corrects to OWNER's satisfaction the reasons for
such action.
3. If it is subsequently determined that OWNER's
refusal of payment was not justified, the amount
wrongfully withheld shall be treated as an amount due as
detcrmined by paragraph 14.02.C.!.
14.03 CONTRACTOR's Warranty of Title
A. CONTRACTOR warrants and guarantees that title
to all Work, materials, and equipment covered by any
Application forPayment,.whether incorporated in the Project
or not, will pass to OWNER no later than the time of
payment free and clear of all Liens.
14.04 SubstanriaI Completion
A. When CONTRACTOR considers the entire Work
ready for its intended use CONTRACTOR shall notify
OWNER and ENGINEER in writing that the entire Work is
substantially complete (except for items specifically listed by
CONTRACTOR as incomplete) and request that ENGINEER
issue a certificate of Substantial Completion. Promptly
thereafter, OWNER, CONTRACTOR, and ENGINEER
shall make an inspection of the Work to determine the status
of completion. If ENGINEER does not consider the Work
substantially complete, ENGINEER will notify
CONTRACTOR in writing giving the reasons therefor. If
ENGINEER considers the Work substantially complete,
ENGINEER will prepare and deliver to OWNER a tentative
certificate of Substantial Completion which shall fix the date
of Substantial Completion. There shall be attached to the
certificate a tentative Jistof jtems to be completed or
~. corrected before f"malpaymenkOWNER shall have seven
,days after receipt of the tentative certificate during which to
make written objection to ENGINEER as to any provisions
of the certificate or attached list. If, after considering such
objections, ENGINEER concludes that the Work is not
substantially complete, ENGINEER will within 14 days after
submission of the tentative certificate to OWNER notify
CONTRACTOR in writing, stating the reasons therefor. If,
after consideration of OWNER's objections,ENGlNEER
considers the Work substantially complete, ENGINEER will
within said 14 days execute and deliver to OWNER and
CONTRACTOR a definitive certificate of Substantial
Completion (with a revised tentative list of items to be
completed or corrected) reflecting such changes from the
tentJtive certificate as ENGINEER believes justified after
consideration of any objections from OWNER. At the time
of delivery of the tentative certificate of Substantial Comple-
tion ENGINEER will deliver to OWNER and CONTRAC-
TOR a written recommendation as to division of responsibili-
00700 - 38
.
.
.
III
II
II
II
II
II
III
II
II
I
II
II
II
I
II
I
ties pending f1Dal payment between OWNER and
CONTRACTOR with respect to security, operation, safety,
and protection of the Work, maintenance, heat, utilities,
insurance, and warranties and guarantees. Unless OWNER
and CONTRACTOR agree otherwise in writing and so
inform ENGINEER in writing prior to ENGINEER's issuing
the definitive certificate of Substantial Completion,
ENGINEER's aforesaid recommendation will be binding on
OWNER and CONTRACTOR until final payment.
B. OWNER shall have the right to exclude
CONTRACTOR from the Site after the date of Substantial
Completion, but OWNER shall allow CONTRACTOR
reasonable access to complete or correct items on the
tentative list.
14.05 Partial Utilization
A. Use by OWNER at OWNER's optiou of any
substantially completed part of the Work which has
specifically been identified in the Contract Documents, or
which OWNER, ENGINEER, and CONTRACTOR agree
constitutes a separately functioning and usable part of the
Work that can be used by OWNER for its intended purpose
without significant interference with CONTRACTOR's
performance of the remainder of the Work, may be
accomplished prior to Substantial Completion of all the Work
subject to the following conditions.
1. OWNER at any time may request CON-
TRACTOR in writing to permit OWNER to use any
such part of the Work which OWNER believes to be
ready for its intended use and substantially complete. If
CONTRACTOR agrees that such part of the Work is
substantially complete, CONTRACTOR will certify to
OWNER and ENGINEER that such part of the Work is
substan1ia1ly complete and request ENGINEER to issue
a certificate of Substantial Completion for that part of
the Work. CONTRACTOR at any time may notify
OWNER and ENGINEER in writing that
CONTRACTOR considers any such part of the Work
ready for its intended use and substantially complete and
request ENGINEER to issue a certificate of Substantial
Completion for that part of the Work. Within a
reasonable time after either such request, OWNER,
CONTRACTOR, and ENGINEER shall make an
inspection of that part of the Work to determine its status
of completion. If ENGINEER does not consider that
part of the Work to be substantially complete,
ENGINEER will notify OWNER and CONTRACTOR
in writing giving the reasons therefor. If ENGINEER
considers that part of the Work to be substantially
complete, the provisions of paragraph 14.04 will apply
with respect to certification of Substantial Completion of
that part of the Work and the division of responsibility
in respect thereof and access thereto.
00700 - 39
2. No occupancy or separate operation of part of
the Work may occur prior to compliance with the
requirements of paragraph 5.10 regarding property
insurance.
14.06 Final Inspection
A. Upon written notice from CONTRACTOR that the
entire Work or an agreed portion thereof is complete,
ENGINEER will promptly make a fmal inspection with
OWNER and CONTRACTOR and will notify CON-
TRACTOR in writing of all particulars in which this
inspection reveals that the Work is incomplete or defective.
CONTRACTOR shall immediately take such measures as are
necessary to complete such Work or remedy such
deficiencies.
14.07 Final Paymen/
A. Applicarionfor Paymen/
1. After CONTRACTOR has, in the opinion of
ENGINEER, satisfactorily completed all corrections
identified during the final inspection and has delivered,
in accordance with the Contract Documents, all main-
tenance and operating instructions, schedules, guaran-
tees, Bonds, certificates or other evidence of insurance
certificates of inspection, marked-up record documents
(as provided in paragraph 6.12), and other documents,
CONTRACTOR may make application for final
payment following the procedure for progress payments.
2. Tbe final Application for Payment shall be
accompanied (except as previously delivered) by: (i) all
documentation called for in the Contract Docume~ts,
including but not limited to the evidence of insurance
required by subparagraphS:04.B.7; (Li) consent of the
surety, . if any ,tofinal payment; and (ill) complete ~d
.legally effectivef"eleases 'or waivers. (satisfactory to
OWNER) of all Lienrights'arising out of or Liens flIed
in connection with the Work.
3. In lieu of the releases or waivers of Liens
specified in paragraph 14.07.A.2 and as approved by
OWNER, CONTRACTOR may furnish receipts or
releases in full and an affidavit of CONTRACTOR that:
(i) the releases and receipts include a1l1abor, services,
material, and equipment for which a Lien could be filed;
and (Li) all payrolls, material and equipment bills, and
other indebtedness connected with the Work for wbj.ch
OWNER or OWNER's property might in any way..be
responsible have been paid or otherwise satisfied. If any
Subcontractor or Supplier fails to furnish such a release
or receipt in full, CONTRACTOR may furnish a Bond
or other collateral satisfactory to OWNER to indemnify
OWNER against any Lien. .
-
II
B. Review of Application and Acceptance
II
1. If, on the basis of ENGINEER's observation of
the Work during construction and fInal inspection, and
ENGINEER's review of the fmal Application for
Payment and accompanying documentation as required
by the Contract Documents, ENGINEER is satisfied that
the Work has been completed and CONTRACTOR's
other obligations under the Contract Documents have
been fulfilled, ENGINEER will, within ten days after
receipt of the fmal Application for Payment, indicate in
writing ENGINEER's recommendation of payment and
present the Application for Payment to OWNER for pay-
ment. At the same time ENGINEER will also give
written notice to OWNER and CONTRACTOR that the
Work is acceptable subject to the provisions of
paragraph 14.09. Otherwise, ENGINEER will return
the Application for Payment to CONTRACTOR,
indicating in writing the reasons for :-d'using to
recommend fInal payment, in which case CON-
TRACTOR shall make the necessary corrections and
resubmit the Application for Payment.
II
II
-
-
-
-
C. Payment Becomes Due
-
1. 111.irty days after the presentation to OWNER of
the Application for Payment and accompanying docu-
mentation, the amount recommended by ENGINEER
will become due and, when due, will be paid by OWN-
ER to CONTRACTOR.
-
14.08 Final Completion Delayed
-
A. If, through no fault of CONTRACTOR, fmal
completion of the Work is significantly delayed, and if
ENGINEER so confirms, OWNER shall, upon receipt of
CONTRACTOR's final Application for Payment and
recommendation of ENGINEER, and without terminJltine the
Agreement, make paYment of the balance due for that portion
of the Work fully completed and accepted. If the remaining
balance to be held by OWNER for Work not fully completed
or corrected is less than the retainage stipulated in the
Agreement, and if Bonds have been furnished as required in
paragraph 5.01, the written consent of the surety to the
payment of the balance due for that portion of the Work fully
completed and accepted shall be submitted by CON-
TRACTOR to ENGINEER with the Application for such
payment. Such payment shall be made under the tenns and
conditions governing fInal payment, except that it shall not
constitute a waiver of Claims.
I
I
I
.
!
I
I
-
-
14.09 Waiver of Claims
A. The making and acceptance of fmal payment will
constitute:
00700 - 40
1. a waiver of all Claims by OWNER against
CONTRACTOR, except Claims arising from unsettled
Liens, from defective Work appearing after fmal
inspection pursuant to paragraph 14.06, from failure to
comply with the Contract Documents or the terms of any
special guarantees specified therein, or from
CONTRACTOR's continuing obligations under the
Contract Documents; and
2. a waiver of all Claims by CONTRACTOR
against OWNER otller than those previously made In
writing which are still unsettled.
ARTICLE 15 - SUSPENSION OF WORK AND
TERMINA TION
15.01 OWNER May Suspend Work
A. At any time and without cause, OWNER may
suspend the Work or any portion thereof for a period of not
more than 90 consecutive days by notice in writing to CON-
TRACTOR and ENGINEER which will fIx the date on which
Work will be resumed. CONTRACTOR shall resume the
Work on the date so fIxed. CONTRACTOR shaIl be allowed
an adjustment in the Contract Price or an extension of the
Contract Times, or both, directly attributable to any such
suspension if CONTRACTOR makes a Claim therefor as
provided in paragraph 10.05.
15.02 OWNER May Tenninarefor Cause
A. The occurrence of anyone or more of the following
events will justify termination for cause:
J. CONTRACTOR's persistent failure to perform
-. . . the Work in accordance:with the Contract Documents
(including, but.not limited to, failure to supply sufficient
skilled. workers or suitable materials or equipment or
failure to adhere to the progress schedule established
under paragraph 2.07 as adjusted from time to time
pursuant to paragraph 6.04);
2. CONTRACTOR's disregard of Laws or
Regulations of any public body having jurisdiction;
3. CONTRACTOR's disregard of the authority of
ENGINEER; or
4. CONTRACTOR's violation in any substantial
r way of any provisions of the Contract Documents.
B. If one or more of the events identified in paragraph
15.02.A occur, OWNER may, after giving CONTRACTOR
(and the surety, if any) seven days written notice, terminate
I
I
the services of CONTRACTOR, exclude CONTRACTOR
from the Site. and take possession of the Work and of all
CONTRACTOR's tools, appliances, construction equipment,
and machinery at the Site, and use the same to the full extent
they could be used by CONTRACTOR (without liability to
CONTRACTOR for trespass or conversion), incorporate in
the Work all materials and equipment stored at the Site or for
which OWNER has paid CONTRACTOR but which are
stored elsewhere, and frnish the Work as OWNER may deem
expedient. In such case, CONTRACTOR shall not be
entitled to receive any further payment until the Work is
frnished. If the unpaid balance of the Contract Price exceeds
all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects,
attorneys, and other professionals and all court or arbitration
or other dispute resolution costs) sustained by OWNER
arising out of or relating to completing the Work,such excess
will be paid to CONTRACTOR. If such claims, costs,
losses, and damages exceed such unpaid balance,
CONTRACTOR shall pay the difference to OWNER. Such
claims, costs, losses, and damages incurred by OWNER will
be reviewed by ENGINEER as to their reasonableness and,
when so approved by ENGINEER, incorporated in a Change
Order. When exercising any rights or remedies under this
paragraph OWNER shall not be required to obtain the lowest
price for the Work performed.
I
I
I
I
I
I
I
I
C. Where CONTRACTOR's services have been so
terminated by OWNER, the termination will not affect any
rights or remedies of OWNER against CONTRACTOR then
existing or which may thereafter accrue. Any retention or
payment of moneys due CONTRACTOR by OWNER will
not release CONTRACTOR from liability.
I
I
15.03 OWNER May Tenninate For Convenience
I
A. Upon seven days written notice to.CONTRACTOR
and ENGINEER, OWNER may, without cause and without
prejudice to any other right or remedy of OWNER, elect to
terminate the Contract. In such case, CONTRACTOR shall
be paid (without duplication of any items):
I
1. for completed and acceptable Work executed in
accordance with the Contract Documents prior to the
effective date of termination, including fair and
reasonable sums for overhead and profit on such Work;
I
I
2. for expenses sustained prior to the effective date
of termination in performing services and furnishing
labor, materials, or equipment as required by the
Contract Documents in connection with uncompleted
Work, plus fair and reasonable sums for overhead and
profit on such expenses;
I
I
3. for all claims, costs, losses, and damages
(including but not limited to all fees and charges of
I
00700 - 41
engineers, architects, attorneys, and other professionals
and all court or arbitration or other dispute resolution
costs) incurred in settlement of terminated contracts
with Subcontractors, Suppliers, and others; and
4. for reasonable expenses directly attributable to
termination.
B. CONTRACTOR shall not be paid on account of loss
of anticipated profits or revenue or other economic loss
arising out of or resulting from such termination.
15.04 CONTRACTOR May SlOp Work or Terminate
A. If, through no act or fault of CONTRACTOR, the
Work is suspended for more..than90'consecutive days by
OWNER or:under' an order of court oLotherpublic authority,
or ENGINEER fails to. act on any Application for Payment
within 30 days after it is submitted; or OWNER fails for 30
days to pay CONTRACTOR any sum fmally determined to
be due, then CONTRACTOR may, upon seven days written
notice to OWNER and ENGINEER, and provided OWNER
or ENGINEER do not remedy such suspension or failure
within that time, terminate the Contract and recover from
OWNER payment on the same terms as provided in
paragraph 15.03. In lieu of terminating the Contract and
without prejudice to any other right or remedy, if ENGI-
NEER has failed to act on an Application for Payment within
30 days after it is submitted, or OWNER has failed for 30
days to pay CONTRACTOR any sum fmally determined to
be due, CONTRACTOR may, seven days after written notice
to OWNER and ENGINEER, stop the Work until payment
is made of all such amounts due CONTRACTOR, including
interest thereon. The provisions of this paragraph 15.04 are
not intended to preclude CONTRACTOR from making a
Claim under paragraph 10.05 for an adjustment in Contract
Price or Contract Times or otherwise.for.expenses.or damage
directly attribU1abIet.O:CONTRACTOR!.s~'stopping;.the Work
as permitted by this paragraph. .
ARTICLE 16 - DISPUTE RESOLUTION
16.01 Methods and Procedures
A. Dispute resolution methods and procedures, if any,
shall be as set forth in the Supplementary Conditions. If no
method and procedure bas been set forth, and subject to the
provisions of paragraphs 9.09 and 10.05, OWNER and
CONTRACTOR may exercise such rights or remedies as
either my otherwise have under the Contract Documents or
by Laws or Regulations in respect of any dispute.
-
_ ARTICLE 17 - MISCELLANEOUS
-
17.0 I Giving Notice
-
A. Whenever any provision of the Contract Documents
requires the giving of written notice, it will be deemed to
have been validly given if delivered in person to the
individual or to a member of the firm or to an officer of the
corporation for whom it is intended, or if delivered at or sent
by registered or certified mail, postage prepaid, to the last
business address known to the giver of the notice.
-
-
17.02 Computation of Times
-
A. When any period of time is referred to in the
Contract Documents by days, it will be computed to exclude
the first and include the last day of such period. If the last
day of any such period falls on a Saturday or Sunday or on
a day made a legal holiday by the law of the applicable
jurisdiction, such day will be omitted from the computation.
-
1-
17.03 Cumula1ive Remedies
A. The duties and obligations imposed by these General
Conditions and the rights and remedies available hereunder
to the parties hereto are in addition to, and are not to be
construed in any way as a limitation of, any rights and
remedies available to any or all of them which are otherwise
imposed or available by Laws or Regulations, by special
warranty or guarantee, or by other provisions of the Contract
Documents, and the provisions of this paragraph will be as
effective as if repeated specifically in the Contract
Documents in connection with each particular duty,
obligation, right, and remedy to which they apply.
~
~
~
,
17.04 Survival of Obligations
,
A. All representations, indemnifications, warranties,
and guarantees made in, required by, or given in accordance
with the Contract Documents, as well as all continuing
obligations indicated in the Contract Documents, will survive
tmal payment, completion, and acceptance of the Work or
tennination or completion of the Agreement.
~
17.05 Con/rolling Law
,
A. This Contract is to be governed by the law of the
state in which the Project is located.
I
I
00700 - 42
r
/
/
SECTION 00800
SUPPLEMENTARY CONDITIONS
The following supplements modify, change from or add to the Standard General Conditions of the
Construction Contract, EJCDC Document 1910-8, 1996 Edition. Where any Article of the General
Conditions is modified or any Paragraph, Subparagraph or Clause thereof is modified or deleted by these
supplements, the unaltered provisions shall remain in effect.
ARTICLE I - DEFINITIONS AND TERMINOLOGY
Add the following sentence to 1.28 Notice of Award: "When requested by OWNER, the Notice of Award
may be issued by the ENGINEER."
Add the following sentence to 1.29 Notice to Proceed: "When requested by OWNER, the Notice to
Proceed may be issued by ENGINEER."
Add the following terms after Paragraph 1.50:
1.51 ARCHITECT/ENGINEER - The person, firm or corporation named as the ENGINEER in the
Agreement.
1.52 Provide - As used in the Project Manual, means to furnish and install, complete and ready for
intended use.
1.53 Product - As used in the Project Manual, includes materials, fabrications, systems and equipment.
1.54 Project Manual - The volume of written construction documents, including the Bidding Documents,
sample forms, and the Contract Documents, such as the Conditions of the Contract and the Specifications.
ARTICLE 2 - PRELIMINARY MA TIERS
Add the following to Paragraph 2.01.: "If the Work is to be commenced prior to execution of the
Agreement in response to a letter of intent, CONTRACTOR shall, prior to commencement of the Work,
submit evidence satisfactory to OWNER that such bonds will be furnished."
In the first line of Paragraph 2.02., change the term "...ten..." to read "...six...".
Delete Paragraph 2.03. and replace with the following:
2.03. The date of commencement of the Work is the date established in a Notice to Proceed. If there is
no Notice to Proceed, it shall be the date of the OWNER-CONTRACTOR Agreement or such other date
as may be established therein.
Add the following to Paragraph 2.05.:
D. CONTRACTOR shall perform no portion of the Work at any time without Contract Documents or,
where specified, approved Shop Drawings for such portion of the Work.
12/04
00800-1
04-480 I
III
II
1,1
11
II
II
II
II
I
I
I
I
I
I
I
I
I
I
I
E. By executing the Contract, CONTRACTOR represents that he has visited the site, familiarized himself
with the local conditions under which the Work is to be performed, and correlated his observations with
the requirements of the Contract Documents.
ARTICLE 3 - CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE
Add the following to Paragraph 3.02.A.:
3. Sections of Division One - General Requirements govern the execution of all sections of the
Specifications.
ARTICLE 4 - AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
In Paragraph 4.02.A., change the term "...Supplementary Conditions..." to read "...bidding
requirements...".
In Paragraph 4.02.B., change the term "Supplementary Conditions..." to read "...bidding requirements...".
ARTICLE 5 - BONDS AND INSURANCE
In the first line of Paragraph 5.04., following the word "...maintain...", insert the words, "...in a company
or companies licensed to do business in the State of Florida,...".
In the last line of Paragraph 5.04.A.6., following the word "...vehicle.", insert the words...I"..., or arising
out of operation of laws and regulations for damages because of bodily injury or death of any person or
for damage to property."
Add the following after Paragraph 5.04.B.7.:
8. Include all major divisions of coverage and be on a comprehensive basis including:
I. Premises Operations (including X, C and U coverages as applicable.
11. Independent contractor's Protective.
111. Products and Completed Operations.
IV. Personal Injury Liability with Employment Exclusion deleted.
v. Contractual Liability.
VI. Owned, non-owned and hired motor vehicles.
VII. Broad Form property Damage including Completed Operations.
9. Provide coverage for not less than the following amounts.
a. Workers' Compensation, etc. under paragraphs 5.4.1
and 5.4.2:
1. State
Statutory
2. Applicable Federal
(e.g. Longshoreman's)
and/or Maritime)
Statutory
3. Employer's Liability
$ 100,000.00
12/04
00800-2 04-4801
b. Contractor's Liability Insurance under Article 5.4, which shall also include completed
operations and product liability coverages and eliminate the exclusion with respect to property
under the care, custody and control of Contractor:
l.
General Aggregate
(Except Products -
Completed Operations)
Products - Completed
Operations Aggregate
2.
3.
Personal and Advertising
Injury (Per Person!
Organization)
4.
Each Occurrence
(Bodily Injury and
Property Damage)
5. Property Damage liability insurance will provide
Explosion, Collapse and Underground coverages
where applicable.
6. Excess Liability
General Aggregate
Each Occurrence
c. Automobile Liability under paragraph 5.4.6:
I. Bodily Injury:
Each Person
Each Accident
Property Damage:
Each Occurrence
OR
2. Bodily Injury and Property
Damage Combined Single Limit:
Each Occurrence
Aggregate
00800-3
$ LOOO,OOO.OO
$ 1,000,000.00
$ 1,000,000.00
$ LOOO,OOO.OO
$ LOOO,OOO.OO
$ LOOO,OOO.OO
$ LOOO,OOO.OO
$ 1,000,000.00
$ 1,000,000.00
$ 1,000,000.00
$ LOOO,OOO.OO
04-4801
I
I
I
I
I
I
I
I
,
,
}/\
I
.;0';
I
I
f.' ,
it'
.
I
iii,
",1;
d. Additional liability coverage for OWNER and ENGINEER shall be provided by
endorsement as additional insureds on Contractor's General Liability Policy. Add the
following names:
OWNER -
City of Sunny Isles Beach
17070 Collins Avenue, Suite 250
Sunny Isles Beach, Florida 33160
ENGINEER -
Calvin, Giordano & Associates, Inc.
Engineers, Planners & Surveyors
1800 Eller Drive, Suite 600
Fort Lauderdale, Florida 33316
OTHER -
The additional liability coverage for ENGINEER is not to be construed as to requiring, in any way, that
either OWNER or CONTRACTOR be obligated to supply insurance protecting ENGINEER for its
liability emanating from professional errors or omissions.
In conformance with the requirements of Section 725.06, Florida Statutes, the specific considerations for
CONTRACTOR's promises are:
a. One dollar ($1.00) in hand paid by OWNER, ENGINEER, and ENGINEER's employees
to CONTRACTOR, receipt whereof is hereby acknowledged and the adequacy of which
CONTRACTOR accepts as completely fulfilling the obligations of OWNER,
ENGINEER, and ENGINEER's employees under the requirements of Section 725.06,
Florida Statutes, and;
b. The entry of OWNER and CONTRACTOR into the construction contract because, but
for CONTRACTOR's promises as contained in the General Conditions, OWNER would
not have entered into the construction contract with CONTRACTOR.
Add the following after Paragraph 5.06.E:
F. The form of policy for this coverage shall be Completed Value.
G. If under the provisions of this insurance there are mandatory deductibles, or if OWNER elects to
increase the mandatory deductibles or purchase this insurance with voluntary deductible amounts, then
OWNER shall be responsible for payment of the full amount of the deductible in the event of a paid
claim.
ARTICLE 6 - CONTRACTOR'S RESPONSIBILITIES
Add the following after Paragraph 6.05.F:
G. The use of asbestos or asbestos-based fiber materials is prohibited in this Project.
Add the following after Paragraph 6.08:
6.08.A. The OWNER will secure and pay for only the following governmental charges and inspection
fees:
12/04
00800-4
04-480 I
~
!L
I
(;-;:
t::.
r"
1-
-
{~. ,
-
'_.,.
I
~
;.;,
.
[
~ ;
(I
I
'"
I
'I
11
_I
j
II
a. special assessments,
b. capital connection fees,
c. threshold and special inspection fees,
d. permanent utility meter installation fees,
e. permanent utility hook-up fees, and
f. impact fees.
6.08.B. CONTRACTOR shall pay for all building permits and charges of utility owners for connections
to the Work, and OWNER will pay charges of such utility owners for capital costs related thereto such as
plant investment fees.
Delete the last sentence of Paragraph 6.12. and substitute the following: "These shall be available to
ENGINEER for examination during construction and shall be delivered "to ENGINEER for OWNER
upon Substantial Completion of the Work."
At the end of Paragraph 6.13.B, add the following sentences: "The Occupational Safety and Health
Administration excavation safety standards, 29 CFR 1926.650 Subpart P trench safety standards are in
effect during the period of construction of the Project. In compliance with current State of Florida
statutes, the Contractor or subcontractor performing trench excavation work on the Project shall comply
with the applicable trench safety standards."
In the sixth line of Paragraph 6.20.A., change the parenthetical insert to read as follows: "...(including but
not limited to fees and charges of ENGINEER, other engineers, architects, attorneys and other
professionals, particularly including, but not limited to reasonable ENGINEER's attorney's fees, and court
costs)" .
ARTICLE 9 - ENGINEER'S STATUS DURING CONSTRUCTION
Change the first sentence of Paragraph 9.01.A. to read as follows: "If OWNER and ENGINEER agree,
ENGINEER will be OWNER's representative during the construction period."
ARTICLE 10 - CHANGES IN THE WORK; CLAIMS
Add the following:
10.06. Without invalidating the agreement, Owner may, at any time execute appropriate Change Orders
for additions and/or deletions in the work of up to 25% of the total contract amount, without a change in
the contract unit prices bid.
ARTICLE 13 - TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR
ACCEPTANCE OF DEFECTIVE WORK
13.03. TEST AND INSPECTIONS:
Replace 13.03.B. with "All testing shall be paid for by the Contractor."
Add the following sentence to Paragraph 13.07.A.: "Specific and special warranties specified in the
Contract Documents are in addition to, and not in lieu of, the contractors general warranty.
CONTRACTOR shall not be relieved of general warranty obligations by the specification of specific
products or procedures."
12/04
00800-5
04-4801
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
13.09. OWNER MAY CORRECT DEFECTIVE WORK:
Change the first line from:
If Contractor fails within a reasonable time after written notice of Engineer...
To read:
If Contractor fails within ten (10) calendar days after written notice of Engineer...
ARTICLE 14 - PAYMENTS TO CONTRACTOR AND COMPLETION
In the first sentence of Paragraph 14.02.A.1., change the phrase "At least twenty days before each
progress payment is scheduled (but not more often than once a month), ..." to read "By no later than the
first day of the month, ...".
Add 14.02.A.4: "An original Partial Release of Lien is required from the General Contractor along with
the application for Payment No. I and for each subsequent application thereafter. For each application for
payment (excluding Application No. I) the Contractor shall submit with the application Partial Releases
of Liens for all Notice to Owners that have been received for the project by the Owner and Engineer".
In Paragraph 14.02.B., change the beginning of the sentence from "Ten days..."to read "Forty-five days".
In the first sentence of Paragraph 14.05.A.2., following the word "...Work...", insert the words "...or to
place and install equipment".
At the end of Paragraph 14.07.A.2. after, ...with the Work. Insert, "(iv) acceptance by the Owners and
governing agencies."
ARTICLE IS - SUSPENSION OF WORK AND TERMINATION
In the twentieth line of Paragraph 15.02.B., insert the following after the words...such excess...;
"...(including but not limited to fees and charges of ENGINEER, other engineers, architects, attorneys and
other professionals, particularly including, but not limited to reasonable ENGINEER's attorney's fees, and
court costs)...".
ARTICLE 16 - DISPUTE RESOLUTION
Delete in its entirety.
ARTICLE 17 - MISCELLANEOUS
Add 17.05.B: "The venue for any cause of action shall be Dade County."
END OF DOCUMENT
12/04
00800-6
04-480 I
I
-
I
I
I
I
I
I
!.
I
I
I
.
.
~
II
;'~~;. . --,
'"
.~:: .
. ,
(. ~ ._ i
!~-
t..,
I!
hi .
I:
_I
SECTION 00300
BID FORM
Bidef ~n~)( tn+p~(;SeS, ]nc. ,
Address 1 2'-1 '='2 (R)~ leD &L CoroJ ~P('~ -::"t I --no"lG
Phone 9~Lf - SIO -v1Do
To furnish all materials, equipment and labor and to perform all work in accordance with the Contract
Documents for construction of: Golden Shores Entrance Wall include coping and caps, and
construction of +/- 920 linear feet of coping on existing barrier wall located in CITY OF SUNNY
ISLES BEACH.
To: CITY OF SUNNY ISLES BEACH
17070 Collins Avenue, Suite 250
Sunny Isles Beach, Florida 33160
The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work
and is familiar with the nature and extent of the work and any local conditions that may in any manner
affect the work to be done.
The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding
Documents, in the manner prescribed therein and to the standards of quality and performance established
by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or
combination of items stipulated. Unit price line items shall include cost of implementing all applicable
safety requirements. Bidder acknowledges that estimated quantities scheduled are approximated for the
sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual
quantities required may increase or decrease. Bidder further agrees that payments will be made on the
basis of actual quantities placed and accepted in the construction
12/04
00300-1
04-4801
City Commission
F SONNY ISIS, City of Sunny Isles Beach Norman S.Eddcup,Mayor
,r Lewis J.Thaler,Vice Mayor
�jsy • see 18070 Collins Avenue Roslyn Brain.Commissioner
� Sunny Isles Beach, Florida 33160 Gerry Goodman,Commissioner
a I Danny Iglesias,Commissioner
1305) 947-0606 City Hall
(305) 949-3113 Fax Christopher J.Russo,Cuy Manager
e r LynnM.Dannheisser,Gary Attorney
• FLOt'hOE (305) 947-5107 Failding DeponmeN Jane A.Rina,City Clerk
o, :� ^"a 1305) 947-5107 Fax
MEMORANDUM
TO: The Honorable City Commission
FROM: Christopher J. Russo,City Manager
DATE: February 10,2005
RE: AWARD OF BID-GOLDEN SHORES ENTRANCE WALL
RECOMMENDATION
It is recommended that the City Commission adopt the attached resolution awarding Invitation to
Bid No. 04-12-02 Golden Shores Entrance Wall to Tenex Enterprises, Inc., 12452 Wiles Road
Coral Springs, Florida 33076.
REASONS
In December 2004 the City issued Invitation to Bid No. 04-12-02 Golden Shores Entrance Wall
for the purpose of securing a contractor to construct an entrance wall around a portion of the
Golden Shores neighborhood. The City received one response to that bid. Our Capital Projects
Management Consultant (Calvin-Giordano and Associates, Inc.) in conjunction with staff has
reviewed that bid and deemed Tenex Enterprises as the sole most responsive, responsible bidder.
ADDITIONAL INFORMATION
The proposed entrance wall will further two goals of the City - improved aesthetics and
increased safety. The wall will be constructed in a modern style and color that complements the
area. It will serve as a buffer against traffic accidents and noise and as a deterrent to crime.
Our bidding procedures provide for an award of bid in the event of a sole response (only one
responsive bidder) provided the City Manager finds the price submitted is fair and reasonable,
and that other prospective bidder had reasonable opportunity to respond, or there is not adequate
time for re-solicitation.