RESOLUTION NO. 2005- ]j3
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
SUNNY ISLES BEACH, FLORIDA, APPROVING A MATCHING
FUND CONTRIBUTION TO THE COASTAL COMMUNITIES
TRANSPORTATION MASTER PLAN PROJECT, IN THE
AMOUNT OF TWELVE THOUSAND EIGHT HUNDRED
THIRTY-TWO DOLLARS ($12,832.00); AUTHORIZING THE
CITY MANAGER TO DO ALL THINGS NECESSARY TO
EFFECTUATE THE TERMS OF THIS RESOLUTION;
PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the coastal communities of A ventura, Bal Harbour, Bay Harbor Islands,
Miami Beach, North Bay Village, Sunny Isles Beach, and Surfside have expressed an interest in
creating a Coastal Communities Transportation Master Plan to address traffic and transportation
issues related to barrier islands; and
WHEREAS, these coastal communities submitted a joint application to the Metropolitan
Planning Organization (MPO) to fund and conduct the proposed Coastal Communities
Transportation Master Plan that was not recommended; and
WHEREAS, the communities will resubmit their joint Coastal Communities
Transportation Master Tax Plan application to the MPO's 2006 Municipal Grant Program for a
maximum possible funding amount of One Hundred Fifty Thousand Dollars ($150,000.00); and
WHEREAS, the Coastal Communities Transportation Master Tax Plan is estimated to
cost Two Hundred Seventy-Five Thousand Dollars ($275,000.00), which would leave a balance
of One Hundred Twenty-Five Thousand Dollars ($125,000), should maximum MPO funding be
secured; and
WHEREAS, the coastal communities will cover the cost of the balance via matching
funds, proportioned according to population; and
WHEREAS, the City of Sunny Isles Beach has a matching fund allocation of Twelve
Thousand Eight Hundred Thirty-Two Dollars ($12,832.00).
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISISON OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section 1. Approval of Matching Fund Contribution. The City Commission of the City of
Sunny Isles Beach hereby approves a matching fund contribution to the Coastal Communities
Transportation Master Plan project, in the amount of Twelve Thousand Eight Hundred Thirty-
Two dollars ($12,832.00).
Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all
things necessary to effectuate the terms of this Resolution.
R2005- Coastal Connnunities Mast Plan ContrIbution.Doc
Page 1 of2
Section 3.
Effective Date. This Resolution shall become effective upon adoption.
PASSED AND ADOPTED this 12th day of May 2005.
ATTEst:
,
.~
. Jm:eA. Hines, City Clerk
Approved As to Form and
Legal Sufficiency:
Seconded by:
\,A 'u ~ Y' 1t-MLtf.
C-o ~ GP Dm,(tt\./
Moved by:
Vote: S-O
Mayor Edelcup
Vice Mayor Thaler
Commissioner Brezin
Commissioner Goodman
Commissioner Iglesias
L(Yes)
-L(yes)
--4L-(Yes)
~Yes)
~(Yes)
_(No)
_(No)
_(No)
_(No)
_(No)
R2005- Coastal Communities Mast Plan Contnbution.Doc
Page 2 of2
CITY OF MIAMI BEACH
CITY HALL 1700 CONVENTION CENTER DRIVE MIAMI BEACH, FLORIDA 33139
www.miamibeachfl.gov
Telephone
Facsimile
March 18, 2005
~' :r.;,'~., .~
~Jl. \ ,!!,;..~~.\f;~'::,: ,;k'1ri ' ",
~."'.,"'. >'>' · If<:D
c, '''''''''' if! a;d:, '. .
MAi~ 2 9 2005 I
Mr. Christopher Russo
City Manager
City of Sunny Isles Beach
17070 Collins Ave. Suite 250
Sunny Isles Beach, Florida 33160
J:')i:'D;B i3l!lach
Mt~nilgel
SUBJECT: "Coastal Communities Transportation Master Plan" Update and Request
('
DearMr~so,~
This is to inform you that our joint coastal communities' application for the Metropolitan
Planning Organization (MPO) to fund and conduct our proposed "Coastal Communities
Transportation Master Plan," was not recommended for award by the MPO's Unified
Planning Work Program (UPWP) Selection Committee. The UPWP had only $140,000
available for new studies and two other County projects were awarded, instead: An
"Arterial Grid Network Analysis" at $60,000, and a "Visioning the Future Study" at
$80,000.
Following MPO recommendation, the City of Miami Beach plans has resubmitted our
joint "Coastal Communities Transportation Master Plan" application to meet a March 5,
2005 deadline under the MPO's 2006 Municipal Grant Program. This latter grant
program could be awarded at a maximum amount of $150,000, while our "Coastal
Communities Transportation Master Plan" is estimated to cost $275,000. This remaining
of $125,000 will have to be a local contribution.
The City of Miami Beach will cover the largest share of the local match, but we would
like the other Cities to consider some funding assistance. We can discuss a specific
allocation, however if we use population, the distribution would be as follows:
Mu.nicipality Population Distribution Matching Funds
City of Aventura 26,142 17.3% $'21,674
Town of Bal Harbour Village 3,309 2.2% 2,743
Town of Bay Harbor Islands 5,118 3.4% 4,243
City of Miami Beach 88,972 59.0% 73,766
City of North Bay Village 6,689 4.4% 5,546
City of Sunny Isles Beach 15,477 10.3% 12,832
Town of Surfside 5.061 3.4% 4.196
150,768 100% $125,000
Please let us know if you are willing to participate in funding the local match required for
the grant and if a population basis is acceptable.
Sincerely,
Jod:x:ez
City Manager
City of Miami Beach
Attachment: Scope of Services/Application
JMG/RMfiaj
F:\WORK\$ALL\(1) EMPLOYEE FOLDERS\ELlSA VILLAR\Transportation\Coastal Comm Itr1.doc
FY 2006 UNIFIED PLANNING WORK PROGRAM
TASK NUMBER AND TITLE: 4.13 MUNICIPAL GRANT PROGRAM
COASTAL COMMUNITIES TRANSPORTATION MASTER PLAN
OBJECTIVES:
· Study the existing and future sub-regional transportation network through extensive
data collection, analysis, and public involvement.
· Develop a multi-modal list of projects, designed to address identified needs based on
the scientific and subjective nature of the project.
· Quantify the cost ofthese projects, relative to their planning, design and construction.
· Prioritize the list of projects into an Implementable 10 year Coastal Communities
Transportation Master Plan.
· Achieve community consensus, and approval by each governing body involved.
· Enhance regional mobility, in a coordinated manner.
PREVIOUS WORK:
· In the late 1990's the Miami Beach Municipal Mobility Plan was developed through a
partnership between Miami Beach and the Metropolitan Planning Organization. Its
purpose was to examine multi-modal measures by which to mitigate mobility issues
on Miami Beach. The vast majority ofthe 45 projects recommended in this plan have
been implemented. Due to this success the plan is already in need of updating. To
truly provide a higher level of planning, it is believed that the Mobility Plan must be
expanded to examine transportation in coastal Miami-Dade County, in a more
coordinated and regional manner. It is recognized that the immediately affected
communities do not exist in a vacuum, and leadership and vision are needed to jointly
manage the transportation system in the area. What is done in one will have far
reaching impacts, not only on each cities immediate neighbors, but on mainland
Miami-Dade County. It is for this reason that a highly coordinated effort between the
affected cities, FDOT, the Miami-Dade MPO, Miami-Dade County and the South
Florida Regional Planning Council is needed.
METHODOLOGY:
· This effort strives to set an example as a targeted sub-regional attempt at
transportation planning which is multi-modal in nature. In doing so it is imperative to
produce a plan that is both scientific and personal in nature. Hard data derived from
traffic counts and analysis will be projected. Issues arrived at through accepted
methodologies will be supported through an extensive public involvement process.
The study will portray existing conditions and project conditions in the future, and
will provide a clear picture of the origin and destination of traffic affecting the coastal
commumtIes, as traffic flows across the causeways. In addition realistic growth
projections will be developed in concert with the MPO, utilizing the future land use
maps and build-out scenarios of each city. It will make recommendations that will
focus coordinated improvements. It will involve local decision makers in the process.
Task 1: Public involvement
Engaging the public and incorporating public input is a multi-level process that
takes place consistently throughout the duration of the plan development. The
goal shall be community consensus, resulting in approval from each of the
governing bodies involved.
Task 2: Data Collection and Analysis
Previous work will be used as a guide to the assignment of data collection efforts.
Planning work will be coordinated with currently ongoing studies and projects
that will have direct and indirect impacts on the relevance and effectiveness of the
Master Plan's recommendations. Traffic counts will be taken along key
transportation routes. Data will be projected so that future impacts can be
examined. It will be important to understand the where current traffic is coming
from and where it is going, therefore an e~ficient and cost effective origin and
destination study will be developed.
Task 3: Needs Assessment
A three level analyses (intersection, corridor, regional) will point to various levels
of need, for various modes both in and adjacent to the coastal communities.
Identified needs will be organized into logical multi-modal categories. From this
assessment a list of potential projects will be developed.
Task 4: Development of Potential Projects
Each project will be conceptually developed. This will entail the formulation of a
project sheet for each project that details the project specifics, which will aid in
the prioritization process.
Task 5: Implementation Plan
The first section of this plan, the data and analysis is an effort to provide a
snapshot of future transportation issues and trends which will impact the study
area. The Master Plan should establish a vision for transportation and make
recommendations for meeting the identified needs. These needs will be met in the
second section of the plan, with the development of projects and Implementation
Plan.
END PRODUCTS:
· Public Involvement Technical Memorandum
· Assessment of Existing and Future Conditions Technical Memorandum
. Project Bank
· Implementation Plan
. Executive Summary
PROJECT MANAGER:
TBD by MPO
PARTICIPATING AGENCIES, CITIES:
. A ventura, Sunny Isles Beach, Bal Harbor, Bay Harbor, Surfside, North Bay Village,
Miami Beach, Metropolitan Planning Organization, Miami-Dade Transit, Florida
Department of Transportation-District Six, South Florida Regional Planning Council,
Florida Department of Community Affairs.
WORK SCHEDULE:
. The technical aspects ofthis project shall take no longer than nine (9) months
FUNDING:
. $275,000 divided as follows
o $150,000 Municipal Grant Program
o $125,000 from joint municipalities on a pro-rata share based on population
APPLICATION DUE DATE:
. March 5, 2005
F:\ WORK\$TRA \AMELIA \TRANS\Coastal Comm MOP Application.doc
ydNNr ,,--...NP.,
. City of Sunny Isles Beach SE Commission
s Norman S Edeleup,Mayor
Ot a Lewis J.Thaler,Yice Mayor
m 18070 Collins Avenue
r Roslyn Brain.Commissioner
. r i Sunny Isles Beach, Florida 33160 Gerry Goodman,Commissioner
:e ,
(305) 947-0606 City Hall Danny Iglesias,Commissioner
1305) 949-3113 Fax Christopher J.Russo,City Manager
4e r, ri°a°04" pas)
(305) 947-2150 Building Department Lynn M.Dannheisser,Cary Attorney
or sus °I 1305) 947-5107 Fax Jane A.Hines,CietClerk
MEMORANDUM
TO: The Honorable City Commission
FROM: Christopher J. Russo, City Manager
DATE: May 12, 2005
RE: Coastal Communities Transportation Master Plan Request
RECOMMENDATION
The coastal communities in northeastern Miami-Dade County (Aventura, Bal Harbor, Miami Beach,
Sunny Isles Beach, and Surfside) are interested in the development of a transportation master plan
that addresses traffic and transportation on the barrier islands.
REASONS
The goal of this plan is to produce short, mid, and long term multi-modal solutions to
transportation issues. In the late 1990's the Miami Beach Municipal Mobility Plan was developed to
mitigate issues on Miami Beach. The vast majority of the 45 projects recommended in this plan
have or are being implemented. Due to this success, this plan is in need of updating. To truly
provide a higher level of planning, the Mobility Plan must be expanded to examine transportation in
coastal Miami-Dade County, in a more coordinated and regional manner. What is done in one will
have far reaching impacts, not only on each cities immediate neighbors, but on mainland Miami-
Dade County. It is for this reason that a highly coordinated effort between the cities, FDOT, the
Miami-Dade MPO, Miami-Dade County and the South Florida Regional Planning Council is
needed.
The City of Miami Beach will cover the largest share of the local match, however if we use
population, the distribution would be as follows:
Population Distribution Matching Funds
City of Sunny Isles Beach 15,477 10.3% $12,832.00
CJR/iw