HomeMy WebLinkAboutReso 2008-1303 -I I RESOLUTION NO. 2008- 136 3 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING THE FIRST AMENDMENT TO THE WILLIAMS PAVING COMPANY, INC., AGREEMENT FOR ADDITIONAL DRAINAGE AND PAVING WORK FOR THE ST ATE ROAD 826/SUNNY ISLES BOULEVARD PROJECT, IN AN AMOUNT NOT TO EXCEED TWO HUNDRED EIGHTY THOUSAND ONE HUNDRED FIVE DOLLARS AND THIRTY-NINE CENTS ($280,105.39), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE MAYOR TO EXECUTE SAID FIRST AMENDMENT TO AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THE TERMS OF THE AGREEMENT; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City was in need of a contractor to furnish all materials, equipment and labor to reconstruct the southern lane of Sunny Isles Boulevard, west from Collins A venue in the City of Sunny Isles Beach, and the City issued and advertised Bid No. 07-03-02, for the State Road 826/Sunny Isles Boulevard Project; and WHEREAS, on May 17, 2007 via Resolution No. 2007-1103, the City Commission entered into an agreement with Williams Paving Company, Inc. to provide the services on a unit price basis in a total amount not to exceed Two Million Eight Hundred Sixty-Three Thousand Nine Hundred Fifty-Eight Dollars and Seventy Cents ($2,863,958.70); and WHEREAS, the City has determined that further drainage and paving work is required for the State Road 826/Sunny Isles Boulevard Project; and WHEREAS, Williams Paving Company, Inc. has provided a proposal for these services and has expressed its ability and desire to provide these services; and WHEREAS, the City wishes to enter into a First Amendment to Agreement with Williams Paving Company, Inc. to provide the services on a unit price basis in an amount not to exceed Two Hundred Eighty Thousand One Hundred Five Dollars and Thirty-Nine Cents ($280, I 05.39), attached hereto as Exhibit "A", bringing the total contract amount not to exceed Three Million One Hundred Forty-Four Thousand Sixty-Four Dollars and Nine Cents ($3,144,064.09), unless amended by prior approval of the City. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section I. Approval of First Amendment to Agreement. The First Amendment to Agreement with Williams Paving Company, Inc. for additional drainage and paving work for the State Road 826/Sunny Isles Boulevard Project, in an amount not to exceed Two Hundred R2008- Williams Paving 1st Amendment to Agmt SR826-SlBlvd Project Page I 01'2 Eighty Thousand One Hundred Five Dollars and Thirty-Nine Cents ($280,105.39), attached hereto as Exhibit "A", be and the same, is hereby approved. Section 2. Authorization of Mayor. The Mayor is hereby authorized to execute said First Amendment to Agreement. Section 3. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate the terms of the Agreement. Section 4. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this I ih day of July 2008. ATTEST: ~A:~ Jane A. Hines, CMC, City Clerk Vote: 5-0 Moved by: vi lee YY\~~Y" ~ ~~ Seconded by: CnM~ ~~~2JN Mayor Edelcup Vice Mayor Thaler Commissioner Brezin Commissioner Goodman Commissioner Scholl v (Yes) ~(Yes) ~(Yes) V (Yes) V (Yes) _(No) _(No) _(No) _(No) _(No) R2008- Williams Paving 1st Amendment to Agmt SR826-SlBlvd Project Page20f2 FIRST AMENDMENT TO CITY OF SUNNY ISLES BEACH AND WILLIAMS PAVING CO., INC. AGREEMENT CONTRACT NO. C0708-081 THIS FIRST AMENDMENT is made and entered into this _day of 2008, by and between the CITY OF SUNNY ISLES BEACH, FLORIDA, a municipal corporation of the State of Florida, (hereinafter referred to as "City") and WILLIAMS PAVING CO., INC. ("Contractor") a business corporation licensed in the State of Florida, whose Federal Identification # is WHEREAS, the City is in need of a Contractor to furnish materials, equipment and labor to reconstruct the southern lane of Sunny Isles Boulevard, west from Collins Avenue in the City of Sunny Isles Beach, and the City issued and advertised Bid 07-03-02 for the State Road 826/Sunny Isles Boulevard Project; and WHEREAS, on May 17, 2007 via Resolution No. 2007-1103, the City Commission entered into an agreement with Contractor to provide the services on a unit price basis in a total amount not to exceed Two Million Eight Hundred Sixty-Three Thousand Nine Hundred Fifty-Eight Dollars and Seventy Cents ($2,863,958.70); and WHEREAS, the City has determined that further drainage and paving work is required for the State Road 826/Sunny Isles Boulevard Project; and WHEREAS, Contractor has provided a proposal for these services and has expressed the ability and desire to provide these services; and WHEREAS, the City wishes to enter into a First Amendment to the Agreement with Contractor to provide the services on a unit basis in an amount not to exceed Two Hundred Eighty Thousand One Hundred Five Dollars and Thirty-Nine Cents ($280,105.39), attached hereto as Exhibit "A", bringing the total contract amount not to exceed Three Million One Hundred Forty-Four Thousand Sixty-Four Dollars and Nine Cents ($3,144,064.09), unless amended by prior approval of the City. NOW THEREFORE, in consideration of the foregoing and for the mutual covenants, representations and warranties and other good and valuable consideration, the receipt and adequacy of which is hereby acknowledged, the parties agree as follows: 1. ADDITIONAL SCOPE OF WORK: Contractor shall provide additional services expanding the scope of the original agreement with Contractor for State Road 826/Sunny Isles Boulevard, to include accommodating the north side merchants with the relocation of barricades, additional curb and gutter work, and other minor improvements, as more fully described in Attachment "A". 2. COST: The total cost for this First Amendment shall not exceed Three Million One Hundred Forty-Four Thousand Sixty-Four Dollars and Nine Cents ($3,144,064.09). 3. TERM: The term to this First Amendment to Agreement shall begin upon the execution and shall end upon the completion of the State Road 826/Sunny Isles Boulevard Project. 4. INCORPORATION OF TERMS AND CONDITIONS: Except as expressly amended or modified by this First Amendment, all of the terms and conditions of the original Agreement between the parties and all amendments subsequent thereto, shall remain in full force and effect. u r ~ C0708-081 I sl Amendment Williams Paving Co., Inc. Agreement IN WITNESS WHEREOF, the parties hereto have executed this document as of the date mentioned above. WITNESSES: W~~ tf.,~u Signature --ill 10' f-, (,~t. \ Print Name CONTRACTOR: WILLIAMS PAVING CO., INC. BY ~ cIfJD Print Name & Title RO!JJJ/c 5,." (rH - s ~cKcrh<Y Im$A-5VKE"1? W:ESSES: '\I&~vlJ~{() Si&nature \ J ()t1f SS C\ A (frilS() Print Name ATTEST ~A-~ Jane Hines, CMC, City Clerk APPROVED AS TO FORM AND LEGAL S N ;Y C0708-08l 1 st Amendment Williams Paving Co., Inc. Agreement . EIsman &Bsbl~~,Q CHANGE ORDER Number Project Name: Date of Issuance: Sunny Isles Beach Drive Improvements 06/27/2008 Effective Date: Owner: Owner Contract No: Engineer: Engineer Contract No: Contractor: Contractor Contract No: City of Sunny Isles Beach 03-4122.0 Marlin Engineering, Inc 03-91823.4 Williams Paving Co., 'nc 07-521 You are directed to make the following changes in the Contract Documents Description: Water Main replacement. additional traffic control. N side SW repair & replaeement Reason for Change Order: Additional work requested by owner. permit agencies and plan omissions Attachments: CRP 1002, 1011, 1014. 1015. 1018. 1023. 1025. 1026. 1028, 1029. 1030. 1031, 1032. 1033. 1034. 1036 $ 2,863,958.70 Change in Contract TimeS: Original Contract Times: Substantial Completion Ready lor Final Payment -0- -0- Calendar Days Change in Contract Price: Original Contract Price: Calendar Days Net changes in Price from previous Change Orders: Numbers I Net changes in Time from previous Change Orders: Numbers $ 280, I 05.39 -0- Days $ 2,863,958.70 Contract Times prior to this Change Order: Substantial Completion -0- Ready for Final Payment -0- Calendar Days Calendar Days Contract Price prior to this Change Order: Net IncreaselDecrease in Price of this Change Order: $ 280, I 05.39 Net Increase/Decrease in Time of this Change Order: -0- Days $ 3, I 44.064.09 Contract Times with all Approved Change Orders: Substantial Completion -0- Ready for Final Payment -0- Calendar Days Calendar Days Contract Price with all approved Change Orders: NOTES: * Non Compensable RECOMMENDED By: Shahin Hekmat, r.E. APPROVED ACCEPTED By: By: _/ .- - --.-_.--~~~ c.~_~=z--. 5.::":':~:..<:- .:..c:..-c~ C.__ CEI Owner Representative Owner Contractor Representative Contractor Eisman & Russo. Inc. Date 6/27/08 Date Date 12<101 Orange Dr1ve. 8ulle 123 . DavIe. FL 33330 Phone: !;64.C6!l2758 . Fax: !;64.C6!l2759 . www.elsmanandrusso.com Jscbr>n >ilk . OrerQo . & "" I . J V I L !\ TTACiIMENT .'.'\" m ;;0 -i - - - - - - - - - - - - - - - - 0 z () E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 w w w w w w N N N N N - - - - 0 ~ 0 a, ,f;. W Iv - 0 \D 00 a, VI W 00 VI ,f;. - N () ::r l>l 0 0 0 0 0 0 - ::l 0 0 0 0 0 0 0 0 0 (JQ a, a, a, VI VI VI a, VI VI VI VI w N N N N t1l --- --- --- --- --- --- --- --- --- --- 0 :::: --- --- --- --- 0 N - 0 N 0 0 0 - - 0 - - 0 0 0 W 00 W vJ -...J VI N VI VI -...J - \D VI N 00 ,f;. l>l 0 --- --- 0 --- --- --- 0 0 --- 0 --- --- --- --- --- ro ..., 0 0 0 0 0 0 0 0 0 0 0 0.. 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 -...J t1l ..., Z -i tTI (/) n tt:I () ;;0 ~ >- >- ,f;. - ~ Z ;;0 >- j;;: ..., ~ (1l 0 l>l -(1l ~ ~ 00 1-; (1l ~ 0.. 3 P> ..., ::l n ~, 3 ~ 0 ..., 3 0.. 9l ~ < :::: t1l CT n' n ;0;- 3 0 ::r ::r ~ l>l l>l P> ... (1l ..., ..., ~ >- ~ ~ ::;. () n' (1l < N 0.. 0' ..., (1l ... C' a 0.. 0 l>l ,f;. 0 - () a r (1l 9-: :r:: ;;0 <: ro ..." >< ..., ::l 3 ..., 0 a 0 S' (/) 0 ..., ::l "0 a 0 ... l>l l>l S?- o n [ (1l (1l ~ ..., 0' ::l ~ -i ~ ..., "0 () (1l (1l tn. 3 '" CT (1l ~ 0 ::l ::l ..., l>l ..., el ..., ::r ..., () ~, 0 0 ~ :J. a 0 ~ S' '" 0 ::r l>l ::l CT (1l ::l 0 ... 3 < < () (1l '" ::l >- ~ (jQ 9l '" (1l C' (1l ::r ~ 2': C' ::l t1l 3 ..., \D :;: ;:+ l>l ::l ..., (1l (/) () ~ ..., 0 ~ ~ 0' 3 ~ (1l 0 (1l ro ~ 0.. ::l qQ' ..., ..., 0.. ~ ~ ~ (1l ::l ::r (1l j;;: ::l 0.. 'll:: ~ '" Bl (1l ..., a '" (1l VI '" P> 0 ..., ~ '? () 0.. ..., 0 ~ 0 (1l ~ (1l l>l :;:::' ..., '" ... () () () t1l (1l ..., (1l j;;: tt:I ..., 3 3 ~ ..., ~ ~. CT (1l l>l ~ Z v;- 0' a ~ 0 ::l '" j;;: 0: :r (1l V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> V'> () 0 Iv - >- 00 - - - - - VI N ,0 0 - "J Iv \D ,f;. 0 \D VI VI - - vJ Iv 00 3 - ~ v. W "0 "....1 V. "a, ',f;. 00 - v. .- w ',f;. \D U. 0 0 w w 0 -...J vJ - 00 00 \D \D a, VI W - .- a, j;;: VI a, .- 0 0 0 0 00 -....l 00 w -...J \D ?" VI ,f;. N a vJ 0 0 0 0 W 0\ ~ V. \0 00 00 \0 -...J 0 0 0\ \D 0 a, 0 0 ,f;. 00 - 0 00 -...J VI 00 -...J 0 N w 0 () 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ~ 0 '" ;;0 (1l () >- i g i i i i ~ i i ~ ~ i i ~ i 0 () :g 3 tTI ..., 3 --- a ..., ..., ..., ..., ..., ..., a a a ..., ..., a ..., ..., a 0 0 0 0 0 0 0 0 0 0 (1l tTI < < < < < < < < < < < < < < < < ::l 0 (1l (1l (1l (1l (1l (1l (1l (1l (1l (1l (1l (1l (1l (1l (1l (1l 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. 0.. a ;;0 0' ::l () q' ",- ;;0 (1l () 0 3 () ~ ",- () 0 'll:: ~ i i ~ "0 (1l ()>- ..., (3 a ..., ;;0 o '0 0 < < < n' _ '0 >- ::l ..., t1l t1l (1l ;0;- 0 0.. 0.. 0.. Q 3 < ~ CT CT ..., ?P (1l (1l '" 0.. '< '< (1l '- 0' ;;0 ;;0 ;;0 3 0 ::l co (1l :@ .< n' n' n' a ;0;- ;0;- ;0;- (1l o tv tv o -.J ~ co n :T ~ ,;0 ", o a. ~ r o !JQ 2-l-lnoo"C ~ :a :a g :!. ~ a '< ~ t:I ..... (J'Q = r-. ("') - - _. -. II> II> o(",)OJg;;'!~ ::l::r"II>- 2 - ll:> 1iQ' := ("') ll:> i2 Jg 5' ~ 0 3 ~1I>2:....,,~ ~ ;"3~QS~ 0.. 0.- o II> ::l '" ;.. S;~~3D.~ :;o~"Cg~5 ;..a~~'< 3 <"(/)'" o g, j;;: ~ i::" ::l '" ~ ~ co (1l '" l>l (b"g. '" tt:lco (1l 0 l>l i:: g.~ l>l ..., 0.. V'> V'> V'> V'> V'> vJ N :-NOo ,f;.ooa, ,f;. 0 vJ "0:- '-0 C\OVl ,f;. VI 00 OW~ \D\DO tv -"....1 o 0\ ow "0'\0 o VI o 00 o~ 00 22C1lO II> II> i:: ., ..... ..... c:r -. ("') n ~11,9. ::r ::r ll:> ::l ~ ~ a.. 2:. iJ(IiJ(Ill:>("') II> II> - 0 '" ~. ("') ~ 5' := 0 ., -l-l3~ _. _. "C _ 33;;--l ; ; 5" ~. ~ tTI "C 1I>::l <: tn. ~ .g fr ;;;. 3 o tll '< _ l>l < '" '" 3::l II> ;;- '" ?P 0.0. "0 ~ ~ $. G' '" ("') ("') ::l ,"'0 t"'l 0 (JQ -:= ()- ~ :;- 0 ~ o ~ ~ :;;:l 0- ~ ., -< tv vJ 00 -...J 0 00 .- 3 '0 ..., o < (1l ::l ;;) a '" ("')("') g t"'l .... --- ., t"'l ~ 0 0- :;;:l ;'! ::l n (j == > Z Cl ~ o ~ ~ ~ ~ o Cl rq:> ~ . @::=O C/) ~Ca ~ C/) f"\ , ~C/) ~ ~O~ . Eisman &BJJH~~Q July 9, 2008 Rick Conner, P.E., Director of Engineering & Public Works City of Sunny Isles Beach 18070 Collins Avenue, 3rd Floor Sunny Isles Beach, Florida 33160 RE: Sunny Isles Boulevard - Change Order No 1 E&R Project No. 1704 Contractor Job No. 07-521 Dear Mr. Conner: Please find attached change order number one in the amount of $ 280, I 05.39 for the above referenced project. This change order includes change order proposal (CRP) numbers 1002, 101 1,1014,1015,1018,1023,1025,1026,1028,1029,1030, 1031, 1032, ]033, ]034 and 1036, copies attached, as submitted by the contractor Williams Paving Company, Inc. The CRPs include signs for the business owner along the north side, replacing of drill shaft by spread footers for light poles, some minor electrical changes as requested by agencies, the 12" water main replacement west of St. Tropez properties, additional traffic control officers as requested the building department and some repairs and changes request by the City. All CRPs have been closely reviewed and accepted by Eisman & Russo, Inc., we feel that the proposals submitted by Williams Paving are justified and the fees associated are fair and reasonable and therefore recommend approval of change order number I. Please feel free to contact me if you need any additional information. Sincerely, Eisman & Russo, Inc. ,...>.,,----'"~2~~ ... ;; / <;... 7"<-:":. - ~~::::- ~~~e~: Shahin Hekmat, P.E. Project Manager cc: Chris Charvat, Project Administrator File 12401 Orange Drive, Suite 123 . Davie, FL 33330 Phone: 954.668.2768 . Fax: 954.668.2769 . wwweismanandrusso.com JlICk.HJn\'ille . Orlando . /)a\'11.' . (k'u/a · ~ J .1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD, Change request number: Description: Status: Origination date: 1002 PROJECT SIGNS P 11/29/07 Customer: CITY OF SUNNY ISLES BEACH I Notice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 12/04/07 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 8,562.63 o INotes I PROJECT SIGNS THAT WERE ORDERED THROUGHOUT THE PROJECT IRevenue Detail Billing Grouplltem 08 002 08 003 Description CUSTOM PROJECT SIGNS INSTALLATION Quantity UM lS lS Unit Price Total Revenue For CR 1002 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: Contractor: WilLIAMS PAVING CO.. INC. By: By: Date: Date: I~ V(J1d l)~ 10/S I /~1 q 55, 1~ ;; ~ 2;;. '/.,) I i (''!if 0 1 I 1.,-;' 12/111 /0') I !f11. ~ ( ;1.14.1. 03/ vi/os ! ; 4~. tFb VI 1ft alp 151, is ~? ) Print Dale: 06/04/08 Revenue 7,799.63 ~ 763.00 . , ..562.63 1 Page 1 of 1 I Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD, Change request number: Description: Status: Origination date: 1011 BELLSOUTH REPAIR P 02/08/08 Customer. CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received dale: Rough order of magnitude: 0.00 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 06/02/08 914,02 o INotes REPAIR TO CRASH ATTENUATOR CAUSED BY BELLSOUTH IRevenue Detail Billing Group/Item Description 07 93Z BELLSOUTH REPAIR - CRASH ATTEN Quantity UM LS Unit Price Revenue 914,02 Total Revenue For CR 1011 914.02 ( /:==?-2-:? Appmval, . ..f., . / ,,/' '/" / ,./.--;--- __' ________. Customer: CITY OF SUNNY ISLES:SEACH '" - ,p~ .~ontractor: WILLIAMS PAVING CO,. INC. Authorized Representative: I!:.... (" -~.-=:: .. ~::.- - 4! ! I. ~~ ~ ~.J~ ~-9 &/:?!; iD fj , , By: f!G~ By: Date: Date: Print Dale: 06/02/08 Page 1 of 1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1014 NEMA 4X DISCONNECT P 02/12/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed SubmiUed date: Received date: Rough order of magnitude: 0,00 INotes AS PER YOUR REQUEST FROM RFW 11 /Quotation Submitted dale: Due date: Submitted amount: Requested days delay: 02/12/08 2,415.00 o IRevenue Detail Billing Group/Jtem 07 93J Description NEMA 4-X DISCONNECT Quantity UM 2.00 EA Unit Price 1,207.5000 Revenue 2,415.00 Total Revenue For CR 1014 2,415.00 ~~ I I /.{4;:/- v'-7 Approvals ;:~:~,: ~;~~~ _ = :~'m"" WILLIAMS PAVING CO. INC. 1./-U / too f:; I j, Date: Date: Print Date: 02112/08 Page 1 of 1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1015 SPREAD FOOTERS P 02/15/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received dale: Rough order of magnitude: 0,00 IQuotation Submitted dale: Due date: Submitted amount: Requested days delay: 02/15/08 23,338.77 o INotes PRICE BASED UPON REVISED SPREAD FOOTER DESIGN GIVEN ON 2/15/08 NOT INCLUDED: UNUSED BASES TO BE PURCHASED BY THE CITY IRevenue Detail Billing Group/ltem 02 01 02 02 07 93K 07 93L 07 93M Description MOBILIZATION MAINTENANCE TRAFFIC EXCAVATION FOR SPREAD FOOTER SPREAD FOOTER REMOVE AND RESET OF PAVERS Quantity UM LS LS 3,00 EA 3.00 EA LS Unit Price Revenue 433.40 691.79 1.100.79 20,365.29 747.50 366.9300 6,788.4300 Total Revenue For CR 1015 23.338.77 I // ~. /~i;;._, _ , .' /.., / ,/../ Customer: CITY OF SUNNY :~s BEAyH/ . -::,t-;-:..~~ ," Authorized Rep;s..intative:~~. >~~E-"- --; ,- By: "YM-i..;.. ~ /k~/k_ I -.::; - ....... Date: 1./1.-1/U1j!!> i , Approvals Contractor: WILLIAMS PAVING CO.. INC, By: Date: j :f!~ ) j Wl! vry-'~.;,I. 11 ~t I, ,^ ? .... ....~l' ~~ ~J/ Print Date: 02/15/08 Page 1 of 1 Change Request Proposal Project: (name and address) 07-521 / SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1018 12" WATER MAIN P 03/18/08 Customer: CITY OF SUNNY ISLES BEACH I Notice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 I Quotation Submitted date: Due date: Submitted amount: Requested days delay: 03/19/08 151.159.98 o I Notes I PRICE DOES NOT INCLUDE ANY ADDITIONAL PERMITS REQUIRED PRICE BASED UPON PLANS DATED 2/12/08 FROM MARLIN ENGINEERING I Revenue Detail Billing Group/Item 02 01 02 02 07 93Q Description MOBILIZATION MAINTENANCE TRAFFIC 12" WATER MAIN Quantity UM LS LS LS Unit Price Revenue 2.935.15 1,467.58 146,757.25 Total Revenue For CR 1018 151,159.98 ) Approvals ( J ..... Customer: CITY OF SUNNY ISLES BEACB . : .' '-- .. /.. "".... .---~ - Authorize~ Representative~ ~~_..(-:-~~;.~~.- By: '";,I..t 1'<l-\1 "- \ Hi /l~H :,\:, \ C. j Contractor: WILLIAMS PAVING CO.. INC, By: ~~ Date: 4-/ \b Iu.d::'" Date. '1,11 'if/ a . 6-1/\ 1 "Je..f L '-, \Jc\?-l.. I'-V ( ,., "'r: C-.,~'\\ ~-\ 1\"\ '-" , '''." \....... \. r \t\'I.'- ....l.-.: ) A~ \ i\ L~' --\ \: \: , \ f"--.\ ( c. :'l~ \tLvf\\ '; ~~-d.i+"::P\\; Print Date: 03119/08 Page 1 of 1 Change Request Proposal Project: (name and address) 07,521/ SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1023 480/120-V TRANSFORMER P 05/01/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 lauotation Submitted date: Due date: Submitted amount: 05101/08 0.00 Requested days delay: 0 I Revenue Detail Billing Group/Item 93 93V Description 480/120-V TRANSFORMER auantitv UM EA Unit Price 550.8500 Revenue Total Revenue For CR 1023 0.00 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: Contractor: WILLIAMS PAVING CO., INC. By: Shahin Hekmat. P.E, 5/2/08 By: Date: Date: """"' Print Date: 05/01/08 Page 1 of 1 Change Request Proposal Project: (name and address) 07-521 I SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1025 ASPHALT RAMPS P 05/07/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 06/17/08 5.193.87 o jNotes I REMOVED SAND AND INSTALLED ASPHALT RAMPS BEHIND HEADER CURB I Revenue Detail Billing Grouplltem 08 007 Descriotion ASPHALT RAMPS/SAND & TRASH REM Quantity UM LS Unit Price Revenue 5,193.87 Total Revenue For CR 1025 5,193.87 .' / Approvals Customer: CITY OF SUNNY)SL Authorized Representative: Contractor: WILLIAMS PAVING CO., INC. By S~ ~ /21/0g , I ~ / f!E. By: Date: Dale: Print Date: 06/17108 Page 1 of 1 Change Request Proposal Project: (name and address) 07-521 / SUNNY ISLES BLVD, Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 000 Change request number. Description: Status: Origination date: 1026 ASPHALT HARMONIZATION p 05/15/08 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: I Notes I INSTALLED ASPHALT BETWEEN HEADER CURB AND EXISTING ASPHALT BY DIVE SHOP AT APPX STA 127+00 !Revenue Detail Billing Group/Item 08 008 Description ASPHALT HARMONIZATION Date: &Jz> 1'UJu/5 , / Print Dale: 06/17/08 Quantity UM LS 06/17/08 5,898,98 o Unit Price Revenue 5,898.98 Total Revenue For CR 1026 5,898.98 Approvals Contractor: WILLIAMS PAVING CO,. INC, By: Dale: Page 1 of 1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD. Customer: CITY OF SUNNY ISLES BEACH INOtice to Proceed Submitted dale: Received date: Rough orner of magnitude: 0.00 INotes ADDITIONAL MATERIAL NOT SHOWN ON THE BID SET (2) 12"X12" TEE (2) 12" BUTTERFLY VALVE (2) 12" SOLID PLUG IRevenue Detail Billing Group/Item 07 93W Description ADD'T MATERIAL NOT ON 81D SET ...--. ---~ By: ~..J t;/-z-;fof!, [, ~~~G. i Date: Plint Date: OS/27/08 Change request number: Description: Status: Originalion dale: 1028 CHANGE IN WATER MAIN PLANS P 05/15/08 05/16/08 IQuotatlon Submitted date: Due date: Submitted amount: 9,487.50 Requested days delay: 0 Quantity UM LS Unit Price Revenue 9.487.50 Total Revenue For CR 1028 9,487.50 Approvals Contractor: WILLIAMS PAVING CO., INC, By: Date: Page 1 of 1 1- Change Request Proposal Project: (name and address) 07-521 / SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1029 REMOVAL OF DRIVEWAY P 06/02/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 06/02/08 10.688.71 o INotes PER THE FIELD DIRECTIVE OF RICK CONNER COST INCLUDES MOT AND REMOBILlZATION IRevenue Detail Billing Grouplltem 07 93X 07 93Y Description R&R CURB AND DRIVEWAY RESET NEW INSTALL OF PAVERS Quantitv UM LS LS Unit Price Revenue 8.481,01 2.207.70 Total Revenue For CR 1029 1 O,68B. 71 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: Contractor: WILLIAMS PAVING CO,. INC. By: By: Date: Date: ~ ~ 5-r.h~( l/!vTl'V- . Print Date: 06/17/08 Page 1 of 1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD, Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 ]Notes CLAIM FOR DLEAY: WATER MAIN IRevenue Detail Billing Group/Item 08 006 Description CLAIM FOR DELAY - WATER MAIN Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: By: Date: Print Date: 06/17/08 Change request number: Description: Status: Origination date: 1030 CLAIM FOR DELAY - WATER MAIN P 05/05/08 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: Quantity UM 19.00 DA 06/17/0B 14.510.68 o Unit Price 763.7200 Revenue 14.510.68 Total Revenue For CR 1030 14,510.68 Approvals Contractor: WILLIAMS PAVING CO.. INC. By: Date: Page 1 of 1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1031 R&R OF UNSUITABLE MATERIAL P 05/07/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 06/17/08 19,730.34 o IRevenue Detail Billing Groupl/tem 08 009 OB 010 Description BACKFILL FOR W/M TRENCH REMOVAL OF UNSUITABLE MATERIAL Quantity UM 648.00 CY 69.00 LD Unit Price 12.0800 172.5000 Revenue 7,827.84 11,902.50 Total Revenue For CR 1031 19,730.34 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: Contractor: WILLIAMS PAVING CO., INC. By: By: Date: Date: Print Date: 06/17/0B Page 1 of 1 Change Request Proposal Project: (name and address} 07-521 / SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1032 CONCRETE SLAB - WATER MAIN P OS/23/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 06/17/08 2,070.00 o INotes CONCRETE SLAB REQUIRED DUE TO UTILITY CONFLICT. DIRECTED TO INSTALL AS PER CITY OF NORTH MIAMI BEACH IRevenue Detail Billing Group/Item Description OB 011 CONCRETE SLAB Quantity UM LS Unit Price Revenue 2,070.00 Total Revenue For CR 1032 2,070.00 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: Contractor: WILLIAMS PAVING CO., INC. By: By: Dale: Date: Print Date: D6/17/DB Page 1 of 1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1033 2" SERVICES P 06/03/08 Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 06/17/08 2,300.00 o jNotes 2" SERVICES REQUIRED AND NOT SHOWN ON PLANS IRevenue Detail Billing Grouplltem 08 012 Description 2" SERVICES Quantity UM 4.00 EA Unit Price 575.0000 Revenue 2,300.00 Total Revenue For CR 1033 2,300.00 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: Contractor: WILLIAMS PAVING CO., INC. By: By: Date: Dale: Prinl Dale 06/17/08 Page 1 of 1 Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD. Change request number: Description: Status: Origination date: 1034 SUNNY ISLES BEACH PERMIT P 1 0/18/07 Customer: CITY OF SUNNY ISLES BEACH I Notice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 I Quotation Submitted date: Due date: Submitted amount: Requested days delay: 06/18/08 1,531.06 o IRevenue Detail Billing Grouplltem Description 08 013 ELECTRICAL PERMIT Quantity UM LS Unit Price Revenue 1,531.06 Total Revenue For CR 1034 1,531.06 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: Contractor: WILLIAMS PAVING CO., INC. By: By: Date: Date: Print Dale: 06/18/08 Page 1 of 1 1- Change Request Proposal Project: (name and address) 07-521/ SUNNY ISLES BLVD. Customer: CITY OF SUNNY ISLES BEACH INotice to Proceed Submitted date: Received date: Rough order of magnitude: 0.00 IRevenue Detail Billing Group/Item 08 015 Description APP 10 OFF DUTY OFFICER Change request number: Description: Status: Origination date: 1036 APP 10 OFF DUTY OFFICER E OS/25108 IQuotation Submitted date: Due date: Submitted amount: Requested days delay: 06/23/08 10,736.00 o Quantitv UM 122.00 HR Unit Price Revenue 88.0000 10,736.00 Total Revenue For CR 1036 10,736.00 Approvals Customer: CITY OF SUNNY ISLES BEACH Authorized Representative: By: Date: Print Date: 06/26/08 Contractor: WILLIAMS PAVING CO., INC. By: Date: Page 1 of 1 City Commission Norman S. Edelcup Mayor Lewis J. Thaler Vice Mayor Roslyn Brezin Commissioner Gerry Goodman Commissioner George "Bud" Scholl Commissioner A. John Szerlag City Manager Hans Ottinot City Attorney Jane A. Hines City Clerk September 19,2008 Elliot Eichel Williams Paving, Co., Inc. 11300 N.W. South River Drive Medley, Fl 33178 Re: 1 st Amendment to SR826/Sunny Isles Boulevard Project Agreement Dear Mr. Eichel: At its regular meeting of July 17, 2008, the City Commission adopted Resolution No. 2008-1303, which approved the above-referenced construction services agreement with Williams Paving Co., Inc. Enclosed are an original amendment agreement and a copy of the approving resolution for your files. Thank you. ~~z:';~ ~ Priscilla Walker, CMC Deputy City Clerk/Office Manager Enclosures cc: Rick Conner, Public Works and Engineering Director Williams Paving - 1 st Amend to SR826 Agrmt Exec Ltr