Loading...
HomeMy WebLinkAboutReso 2016-2621 RESOLUTION NO. 2016- 2-1 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NUMBER TWELVE (12) TO THE AGREEMENT WITH FLORIDA ENGINEERING AND DEVELOPMENT CORPORATION, FOR PROFESSIONAL CONSTRUCTION SERVICES FOR THE CONSTRUCTION OF THE 174 STREET ROADWAY IMPROVEMENT PROJECT, EXTENDING THE AGREEMENT EXPIRATION DATE, ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on April 16, 2015 vita Resolution No. 2015-2401 the City Commission awarded Bid No. 14-11-01 to and entered into an Agreement with Florida Engineering and Development Corporation for Professional Construction Services for the construction of the 174th Street Roadway Improvements Project, in an amount not to exceed Two Million Nine Hundred Sixty-Five Thousand Seven Hundred Fifty Dollars and Twenty Cents ($2,965,750.20); and WHEREAS, on October 15, 2015 via Resolution No. 2015-2473 the City Commission approved Change Order No. 2 to the Agreement with Florida Engineering and Development Corporation, in an amount not to exceed Two Hundred Eight Thousand Five Hundred Thirty- Seven Dollars and Fourteen Cents ($208,537.14), and Change Order No. 3 for additional Professional Construction Services for the 174th Street Roadway Improvements Project, in an amount not to exceed One Hundred Fifty-Eight Thousand Four Hundred Ninety-One Dollars and Forty-One Cents ($158,491.41), for a total amount not to exceed Three Hundred Sixty-Seven Thousand Twenty-Eight Dollars and Fifty-Five Cents ($367,028.55), bringing the total contract not to exceed amount to Three Million Three Hundred Thirty-Two Thousand Seven Hundred Seventy-Eight Dollars and Seventy-Five Cents ($3,332,778.75); and WHEREAS, the original design and scope contemplated the construction of five-foot sidewalks and the addition of bicycle lanes using the existing one-foot grass strip which is currently embedded in the sidewalk, although the bike lane striping was eliminated via Change Order No. 4, the overall pavement width was maintained in order to retain the flexibility to add the bike lanes in the future, and Change Order No. 5 for temporary lighting due to FPL meter outage; and WHEREAS, it was deemed more favorable for the City and its residents to forgo the concepts of bike lanes all together, in lieu of wider seven-foot sidewalks through the entire corridor; and WHEREAS, on February 18, 2016 via Resolution No. 2016-2524 the City Commission approved Change Order No. 6 to the Agreement with Florida Engineering and Development Corporation, for additional sidewalk and curb repair/construction done to the 174th Street corridor to construct this expanded scope along the full length of 174th Street corridor within the Phase I limits which was previously completed, in an amount not to exceed Two Hundred Forty- R2016-Fla Engineering CO 12 to Agmt 174 St Construction Srvs.doc Page 1 of 3 Six Thousand Eight Hundred Three Dollars and Fifty-Three Cents ($246,803.53), bringing the total contract not to exceed amount to Three Million Five Hundred Seventy-Nine Thousand Five Hundred Eighty-Two Dollars and Twenty-Eight Cents ($3,579,582.28); and WHEREAS, on July 21, 2016 via Resolution No. 2016-2571 the City Commission approved Change Order No. 8 extending the Agreement with Florida Engineering and Development Corporation an additional 98 days for various reasons including but not limited to inclement weather and coordination with other utility companies; and Change Order No. 9 approving a time extension of an additional 20 days due to a survey verification at the time of construction revealed 1) undulations in the roadway pavement creating areas of ponding, and 2) existing asphalt varies in thickness from 1" to 3", in order to minimize this and create a constant flow of water to the existing drains, more extensive roadwork is required including complete removal of the existing asphalt, and reworking the base to create more constant slopes, at an additional cost of Twenty-Seven Thousand Seven Hundred Thirteen Dollars and Fifty Cents ($27,713.50) which will be absorbed through credits from the base bid, and the remaining balance will be applied to the project contingency, moving the completion date from the original date of March 30, 2016 to November 28, 2016, and the total contract not to exceed amount of Three Million Five Hundred Seventy-Nine Thousand Five Hundred Eighty-Two Dollars and Twenty-Eight Cents ($3,579,582.28) remaining the same; and WHEREAS, Change Order Number 11 to the Agreement with Florida Engineering and Development Corporation is on today's agenda, for additional Professional Construction Services for the 174th Street Roadway Improvements Project, for a time extension of an additional 30 days for the removal of the existing street light wiring, followed by installation of new conduit and wiring for the existing poles along the full length of 174th Street from Collins Avenue, west which was not part of the original scope of services but is required to alleviate recurring system failures, in an amount not to exceed Two Hundred Fifteen Thousand Two Hundred Sixty-Six Dollars and Eighty-Four Cents ($215,266.84), of which Sixty-Three Thousand Five Hundred Sixty-Two Dollars and Seventy-Nine Cents ($63,562.79) of the proposed change order will be absorbed by the project contingency balance, increasing the project budget by One Hundred Fifty-One Thousand Seven Hundred Four Dollars and Five Cents ($151,704.05) to cover the remaining balance, and extending the expiration date to February 10, 2017, bringing the total contract amount not to exceed to Three Million Seven Hundred Thirty-One Thousand Two Hundred Eighty-Six Dollars and Thirty-Three Cents ($3,731,286.33); and WHEREAS, the City is now in need of extending the Agreement with Florida Engineering and Development Corporation: Change Order No. 12 is a time extension of an additional 10 days to split the island located in front of Winston Towers 200 Building to create a turn area for vehicles, which was not part of the original scope of services, at an additional cost of Thirty-Two Thousand Three Hundred Four Dollars and Twenty-Two Cents ($32,304.22), of which will be absorbed by the project contingency balance, extending the expiration date to February 20, 2017, and the total contract amount not to exceed Three Million Seven Hundred Thirty-One Thousand Two Hundred Eighty-Six Dollars and Thirty-Three Cents ($3,731,286.33) remaining the same; and WHEREAS, the City being satisfied with the professional construction services provided by Florida Engineering and Development Corporation, and who has expressed its ability and desire to provide these services, desires to amend the Agreement; and R2016-Fla Engineering CO 12 to Agmt 174 St Construction SrvsPage 2 of 3 WHEREAS, the City Commission wishes to approve Change Order Number 12 to the Agreement with Florida Engineering and Development Corporation, for additional Professional Construction Services for the 174th Street Roadway Improvements Project, in an amount not to exceed Thirty-Two Thousand Three Hundred Four Dollars and Twenty-Two Cents ($32,304.22), of which will be absorbed by the project contingency balance, extending the expiration date to February 20, 2017, attached hereto as Exhibit "A", and the total contract amount not to exceed Three Million Seven Hundred Thirty-One Thousand Two Hundred Eighty-Six Dollars and Thirty-Three Cents ($3,731,286.33) remaining the same. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order No. 12 to the Agreement. The City Commission hereby approves Change Order Number 12 to the Agreement with Florida Engineering and Development Corporation for Professional Construction Services for the construction of the 174th Street Roadway Improvements Project, extending the Agreement expiration date from March 30, 2016 to February 20, 2017, attached hereto as Exhibit "A". Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 20th day of October 2016. foi( forge H. Schol , Mayor ATTES i / fop ifsfe"" . L Jane A. 'ne , 'I C, City Clerk Approved As to Form and Leg. j•- i y: .��1'ttinot, ity Attorney (� Moved by: Z)IMM, �-lE-1bv Seconded by: 1f V V\. CAO1-1)M41-4 Vote: Mayor Scholl I-Q,s�rl'( (Yes) (No) Vice Mayor Gatto (Yes) (No) Commissioner Aelion V (Yes) (No) Commissioner Goldman ✓ (Yes) (No) Commissioner Levin /(Yes) (No) R2016-Fla Engineering CO 12 to Agmt 174 St Construction SrvsPage 3 of 3 SUNNY iso CHANGE CITY OF ORDER *, ,� ::L- ='P• SUNNY ISLES BEACH _ r tiF �* FL04\ c C,rY OF SUN PNO AMENDMENT NUMBER: #12 DATE: 10/17/2016 BID NUMBER: 14-11-01 PROJECT: 174th St Roadway Improvement RESOLUTION NUMBER: 2015-2401 ORIGINAL BASE CONTRACT AMOUNT: $ 2,660,982.00 ORIGINAL CONTINGENCY ALLOWANCE: $ 290,068.20 ORIGINAL TOTAL CONTRACT AMOUNT: $ 2,965,750.20 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE $ 803,900.28 ' ORDERS/CONTINGENCY DRAWS: DOLLAR AMOUNT OF THIS CHANGE ORDER/CONTINGENCY DRAW: $ 32,304.22 CREDIT/DIRECT PURCHASES: $ 0 NEW DOLLAR CONTINGENCY AMOUNT: $ 67,695.78 NEW DOLLAR CONTRACT AMOUNT: $ 3,731,286.33 ORIGINAL CONTRACT COMPLETION DATE 03.30.16 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 218 AMOUNT OF DAYS PER THIS CHANGE ORDER: 10 NEW CONTRACT COMPLETION DATE: 02.20.17 DESCRIPTION OF SCOPE OR WORK CHANGES: The scope of work: Island located in the front of Winston Towers 200 Building will be split to create a turn area for the vehicles. NOTE: Unless specifically stated dearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the issues set forth in this document. CONTRACTOR: Florida Engineering & Development Corp CITY ATTORNEY: Hans Ottinot PROJECT MANAGER: Elka Linton CITY MANAGER: Christopher J. Russo Florida Engineering 8 Development Corp 12076 NW 98th Ave. FLORIDA ENGINEERING Hialeah Gardens Fl.33018 d DEVELOPLtdXENT CORP. E"li!!t!t�YpM l,Y.l.rlr Cl.,wnr Project:NE 174th Street Roadway Improvements Scope of work:Island located front of Wiston Towers 200 STA 15+00 will be split to create a turn area for the vehicles Tum area will be approximately 35'x 20' Contract time add:10 days.came Location: NE 174th Street Date: 10/14/16 . . - • . . • - . PROPOSED AMD No. 13 Split up ISLAND AT STA 15+00 I. Split up Island located front of Wiston Towers 200 No. Item Qty Unit Unit Price Total A) MOT and Police 1 Police Officer 80 Hrs $ 60.00 $ 4,800.00 2 Barricades/Signs 10 Day $ 355.00 $ 3,550.00 Sub-Total MOT and Police $ 8,350.00 B) Island Clearing and Grubbing Items to be demolish: Top Soil 89 sy Type 0 curb 70 If Dispose Irrigation Pipe 4-2"to 3/4"PVC pipe 50 If Dispose Electrical Pipe 4-2"PVC pipe 50 If Labor 3 Foreman . 16 Hrs $ 54.34 $ 869.44 4 Operator(1). 24 Hrs $ 42.26 $ 1,014.24 5 Laborer(2) 48 Hrs $ 28.98 $ 1,391.04 Equipment 6 Backhoe 24 Hrs $ 105.00 $ 2,520.00 7 Loader 16 Hrs $ 86.25 $ 1,380.00 8 Saw cut machine 4 Hrs $ 35.00 $ 140.00 9 Truck(hauling)Top Soil 7 Load $ 137.50 $ 962.50 10 Truck(hauling)concrete 2 Load $ 200.00 $ 400.00 11 Truck(hauling)pipes 1 Load $_ 200.00 $ 200.00 Sub-Total Clearing and Grubbing $ 8,877.22 C) Restoration of Turn Island . 12 Electrical sleeve 1 Is $ 1,650.00 $ 1,650.00 13 Irrigation sleeve 1 Is $ 2,250.00 $ 2,250.00 14 Tree relocation 2 ea $ 750.00 $ 1,500.00 15 12"Limerock Base for Road Reconstruction 90 SY $ 15.60 $ 1,404.00 , 16 12"Sub base Course for Road Reconstruction . 90 SY $ 3.20 $ 288.00 17 Tencate Mirafi 180 SY $ 5.00 $ 900.00 18 3"Type SP-9.5 Asphalt(2 Lifts)for Reconstruction Road 90 sy $ 21.50 $ 1,935.00 , 19 Asphalt min Mobilization 1 ea $ 3,500.00 $ 3,500.00 20 Type D curb 110 Lf $ 15.00 $ 1,650.00 Sub-Total Restoration $ 15,077.00 , TOTAL PROPOSED AMD 13 $ 32,304.22 Omar Medina Florida Engineering . • la v tt,is- D e•--..e—N -. 0.4''' al il! ...- - '111;4 • 8 frx-5 . it..t.....4. < . r•-• re .2i.4 . . NOuynNIINO3 2:10.d NOLIVI1NIINO9 If (J33HS SIH1.) LAM 110J_LO8 33S 804 01.-3 J33HS 33S 7 r ' Pg . L.,..-.. 1 ..- i . „:-...r -1 ,71— I. a I • 4°'--- I • “ 4. I , I <I al - -I-' 0 VI \----6-4 4 • 1 - 1 11.‘ < wg 0 113 f' ,1,1 li i.2 ,. Lei „i‘i•ici , ,.....,,,, t 5,,- li oiri ..,,. ......:(... 1 1.!,11 7 w0 • F.,.. .: „al POT Ot '. 4.10 0 1 Or 01 0 1 .1 Ralik gi - :-..,.. 2 ----N - 1.* — • „ 0 : di _.... 1 w lk id 1 roe ‘..-1 1-'1 ' .•-- -k t: 2 -fs n' 0 .13,- - ,1.1......' '.. , '-•, ' -,7;Ka 'L- , • .4-: ) C'1% ,_A 1110 1 1 • ls,te. --... , ::; ; :: • I I gel .• e ..._ .. •, .,,, .... ,..,...,.., 4, . w ,, , •,, i.,,R.. I al---11ft.:Ek I IN • Abw <1 g 40 < Ir I 1 i 0/ ki lif q i°`128 ..1.a ... . ,,§t < N” '• ' i.c:::tc:;, ilj V k. . 0 . . _ ,,., ,„,, • 4 ':',V44riA 11..r. Wr'' 1.,I. n '?: . 04 V ' ; i !':::14 rilliii‘71111116 "I ui I— g T' 0 . .1 il i f't I 4' . . 1 -,0 ......!...:t.:•.,,., lc, q II ! yli 'i i El 111 1 ;', ta i A .'„ i,, ° e/ • 11 il'g Et 0 111D\ 0 toli.ii' I I, t:•,g " s. 0 . , . rci ... j r .11. lig! , : ,- ___- ti. . •0 p< 1 slil 13 ri.- ,, ,, 0 .1 4 1,1 41 og . '-' 'f I '• 1 1 1; - ,1:"I', 4 b ''''-• .A g8g ID 11.4 ; ?,j41 ri 1p g5i , 0 u * lit—. g 2: 1 1 1:1,, , ''',1,0 0' ..a.gatigivancroil!. /1 'g I !! t \ cli - 1.•,, '•%-:.e:, El' , . Id 0 6 A ;.1„); §.f:* EV!,..i5h '• 1 Cj 9 11 •ig 0 0 1, 0 t., w i,1,.1,•-s, o x.-q.41. .-.• • . , <1111 1.5,,,i0._,,g-,,,,,, •84 --70,. .,s.i,,•4- 1 ., 49 Z_00 .,ii iiipiplIIIP-st: .. 1*. ;oils n _ -----."•••••mimiiminililietrillailt V ;"•57-", ';,:-.e. i'• ':sl D.. . 0 - -,•,‘. ,aii; a -, y,x1,„-•;:•••• g .?.: ,t"I• 1 - . 0 ' 0 g 00.1 .71,;::, :•..., -i =';--i •T"-- ) .4 1 \Me C p, 1111111 -PIE 091 \ -.r, 0 10004 III IP° . fi, . 1 . ...- t_... 0 : 0.t ; 13 ,hsgrtf f=1=I=I I.1=61 COI II=1 1.1 col 19..........11.1 612 MEI 0 ri•ii;:ia 1330d JO simn NOLLV11NU.N00 80A (1.33HS S11-11.) IHD18 d01 33S • so'NY rsc City of Sunny Isles Beach ,"oq - `7 18070 Collins Avenue `; - 1` . = Sunny Isles Beach, Florida 33160 n9,,F`Q.%.° 4.7 (305)947-0606 City Hall c'tr os su'+ "`'s) (305)949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Elka Linton-Dorsett, Capital Projects Manager DATE: 10/20/2016 Approve Change Order No. 12 with Florida Engineering RE: and Development Corporation for Professional Construction Services for the 174th St Roadway to Upgrade the Lighting RECOMMENDATION: Staff recommends approval of this resolution. REASONS: Resolution No. 2015-2401 approved the award of ITB No. 14-11-01 to Florida Engineering and Development Corporation to provide professional construction services for the construction of the 174th St Roadway Improvement Project. The general scope of services included drainage enhancements, complete sidewalk and roadway reconstruction from N. Bay Road east, to Collins Avenue. Improvements west of N. Bay Road were limited to milling and resurfacing the existing pavement surface, and minimal sidewalk repair. New landscaping and irrigation will be installed along the full length of 174th Street. Four (4) subsequent resolutions (Reso No's 2015-2401, Reso 2015- 2473, Reso 2016-2524 and Reso No 2016-2571) approved change orders to the scope of services, increasing the contract value by $367,028.55 to $3,579,582.28. 309 We are requesting Commission approval on proposed Change Order 11 today, and if approved we are also proposing Change Order 12 for additional Professional Construction Services for the 174th Street Roadway Improvements Project. The scope of work includes reconstruction of the median along Winston Towers 200 to allow for a left turn movement from Winston Towers 200 loading dock onto 174th St. Change order 12 will be completely absorbed by the existing project contingency and will have no impact on the total contract value. The contract will be extended by 10 days to February 20th, 2017 for this additional scope of work. FUNDING SOURCE: Funding has been appropriated in account No 300-5-5410-465000- 84001. ATTACHMENTS: Description Resolution Change Order No. 12 Item Number: 10.M. _ • • 310