C I T Y 0 F S U t.fN~ I S L E S B E A C H
I
I-
.
I.
.
~
,
CENTRAL ISLAND DRAINAGE AND
STREET IMPROVEMENTS
.
.
-
.
I
I
.
.
.
--
,.
-.
~
.
.
.
.
.
-.
\.
--
.
.
CONTRACT DOCUMENTS A
SPECIFICATIONS
OCTOBER 1sT 2007
-ID:CEIVED
NOV f. 8 2007
(N7r6J (Ov bS ^-"".
elly 01 Sunny laIe. Boaoil
Ollk:e of lIle C: Clflrk
/'i LJ (/
J-- S/
I C/: O;tJ
V~ IJ./
.
r
~
SECTION 00300
BID FORM
Bid of (Name of Bidder)
Ocean Bay C'DDStructioD. IDc.
Address
2200 NW 16th St.
pompano Beach, F1 33069
Phone
954-960-0130
Fax:
954-960-3312
To furnish all materials, equipment and labor and to perform all work in accordance with the Contract
Documents for construction of: CENTRAL ISLAND DRAINAGE AND STREETS IMPROVEMENTS
located in the CITY OF SUNNY ISLES BEACH.
To: CITY OF SUNNY ISLES BEACH
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
The undersigned Bidder has carefully examined the Bidding Documents and the site of the proposed work
and is familiar with the nature and extent of the work and any local conditions that may in any manner
affect the work to be done.
The undersigned Bidder agrees to do all the work and furnish all materials called for by the Bidding
Documents, in the manner prescribed therein and to the standards of quality and performance established
by the Engineer for the unit price amounts stated in the spaces herein provided, for each of the items or
combination of items stipulated. Unit price line items shall include cost of implementing all applicable
safety requirements. Bidder acknowledges that estimated quantities scheduled are approximated for the
sole purpose of obtaining comparative bids for determination of the lowest responsible bidder and actual
quantities required may increase or decrease. Bidder further agrees that payments will be made on the
basis of actual quantities placed and accepted in the construction
UNIT BID PRICE SCHEDULE
Unit
Item No. Description Estimated Unit Price Amount
Quantity
US$ US$
101-1 Mobilization 1.0 LS l-tlR ,)II.,.'-~O .3:5H d lre,.o 0
102-1 Maintenance of Traffic 365 LS/Da :;;. 'J'I. 0" B I CN,.,(').oO
102-3 Commercial Material for Driveway 500 CY 7 </.8<J 3-1 ('0
'!oo
102-14 Traffic Control Officer 200 MH 40'o.:J g. (xx) .,,0
102-61 Proiect Sian, (see Special Provisions) 3 Ea 1..5o()."c tl. Sa:>.!;,'"
102-71-11 Barrier Wall (temporary) 100 LF 9::;'.00 q =loo."'"
1 02-71-21 Barrier Wall (relocation) 300 LF q,-15 ~ Cj.;;S. (,,0
104-13-1 Staked Silt Fence 500 LF 10 00 . '" Q(.O.oo
109-71-1 Field Office (300 SF Min.) 365 Da =34>.00 I,"J 140. () 0
110-3-7 Removal and Disposal of DrainaQe Structures 20 EA "300.(X) fry 000 ('0
Removal of Existing Concrete Sidewalk (4" and I/J .()o
110-4-1 6" Thick Included) 1,298 SY 1.1 €iRo, 00
110-4-1-1 Removal and Disposal of Existinq Curb and Gutter 1,519 SY ,5.,-,0 ..,. S9<:. tX>
Oct. 2007
00300-1
11
.
"" 1 c:J- I.).
120-1 Reoular Excavation 1,101 CY ,8 (p3 990.
230-2 Umerock Material (12" Thick) 1,233 CY qtn.oo /lR 3(r'~, 0 c
327-70-1 MillinQ of existina Pavement (1" Ava.) 23,787 SY ~ Sa I Ai .:;JS"', 5-0
331-2-1A Type S-1 Asphaltic Concrete (3' Avo.) 3,611 Ton II,) CO '/1." .;)(os . '- "
425-1-331 Curb Inlet Type P-3 (<10') 1 Ea 4 f41_.o" <-J =J9t., ,DC
425-1-341 Curb Inlet Tvoe P-4 (<10') 1 Ea loO'!&, ,60 I~ oW. <..,G
425-1-351 Curb Inlet Tvoe P-5 (<10') 8 Ea '-1(.,,71.00 .) =r 31.:>~ <'0
425-1-361 Curb Inlet Tvpe P-6 (<10") 18 Ea '!qSB ou P. 4 J 4'1-.06
425-1-521 Ditch Bottom Inlet Type C (<10') 22 Ea 3BID/. 00 84 q..,;J. ()J
425-1-541 Ditch Bottom Inlet Type D (<10') 32 Ea t.J ':l..~ >-': v:. 13CjLj51t>,bO
425-1-542 Ditch Bottom Inlet Type D (>10') 1 Ea <; 41 :","C <:; <-113 00
425-1-671 Inlet Tvpe P-11 (Dade Countv Std <10') 5 Ea 4RSk.' (I .:,J4 .;:;)'10.'"
425-2-41 Manhole Tvpe P-7 (<10') 26 Ea Lj~(",<""() lOCi e-:;iD.oO
425-2-42 Manhole Tvpe P-7 (>10') 3 Ea L/L/s/./Ju 13 3S~ L~O
425-5 Manhole (Adiust) 29 Ea :soo.c-{'l I '-/ Ciou, C (J
430-171-123 Pipe Culvert 15" RCP 63 LF 17950 II :>'08 5'Q
430-171-125 Pipe Culvert 18" RCP 5,882 LF 'o~,oo (5lJ9 91D'1-, C/o
430-171-129 Pipe Culvert 24" RCP 2,748 LF 110.00 ':>'{),l CJPn.O('
430-941 Pipe Desiltina 500 LF 10.00 ~-::; O(){) , ell'
440-1-60 Underdrain Type Special (Swale Trench) 3,490 LF (ol.SO 1:::J14.(,,~5 00
520-1-10 Concrete Curb and Gutter Type F 1,686 LF .~S.oo </.J. 1~".oV
520-3 Concrete Vallev Gutter (3' wide) 908 LF ;.;S. c0 .=.1.:> =100.00
520-6 Concrete Shoulder Gutter 331 LF d &, (JQ R (;, 00
100 In '
522-1 Concrete Sidewalk (4" Thick) 3,698 SY L/;) . (.>0 115:<:;" 3tG:"e.,6
522-2 Concrete Sidewalk (6" Thick) 166 SY '-IS. O~J +- y =to .00
523-1-2 PatternedITextured Pavement (Stamped) 39 SY 100'()O .z.... c'Oo (\ 0
Sodding St. Augustine (including fertilizer and I/q I.t>SS.,(,)O
575-2 waterino) 23,931 SY SOD
580-327-2 Relocation of Small Trees 20 Ea ,~J(, l)(,) V) (XX) 0 0
, "
1(..'0 00 .
700-20-11 SinQle Post Sian 122 AS .':<.<r., loCO (,.CJ
700-46-21 Relocate Sinole Post Sion 30 Ea .:J$(). (' (l +- .'\1)(\. (\0
706-3 Marker Pavement Retro Reflective Marker 384 Ea I, , <,,'0 ,9 _~q. 00
711-11-160 Pavement Messaoes (Bike & Arrow) 26 Ea -l-S.Ob I Q6oo0
711-11-170 Directional Arrows Thermoolastic (16 SF) 10 Ea R c;; yO -0Su,00
711-11-251 Guidelines Yellow Thermoolastic 18 LF ;J.OQ -)(/'1, (H'o
711-11-140 Skip Traffic 2' of 4' White Thermoolastic 178 LF 1.00 11~,oo
711-11-122 Solid Traffic Strioe 8"WhiteThermoolastic 902 LF I.,,)D IOf-~-J.'-Io
Solid Traffic Stripe 12" White Thermoplastic ;;.uo J
711-11-123 1,735 LF ~'-/~o' OLl
711-11-124 Solid Traffic Stripe 18" White Thermoplastic 433 LF 3 LK) ,I d <1 q. DO
711-11-125 Solid Traffic Strioe 24" White Thermoolastic 338 LF 4.0(:) I ~,""-."l.() ()
711-11-224 Solid Traffic Stripe 18" Yellow Thermoplastic 30 LF 3, 00 QO.oo
711-11-110 Solid Traffic Stripe 4" White Thermoplastic 3.775 NM I =1.3'1.33 (0<:. L/3 3;;'
711-11-210 Solid Traffic Stripe 4" Yellow Thermoplastic 3.598 NM I, .:J.33.33 I" ;;) .~/:" .sc).
730-70D Drainaoe Wells (Exfiltration Wells) 22 Ea i 10 JR/160 ':),;)3 '/f..,O 00
730-70E Drainaoe Wells Structure Steel Casino 24" Od Stalled 1,166 LF '? "Jt.- . 4, I :~R('J A)l. J(.
730-70F Drainaoe Wells Open Hole 24" Dia. 1,100 LF .183 hO 3// '9(.,0. {J 0
Total US$ t./,~ <I~ C-LV c;, ,L
10%
Contingency 0(.
for the use ~.J.1/,-,'-'D.
of the City US$
Oct. 2007
00300-2
,.
~
I GRAND
TOTAL
I US$ ~6rllol~81
hi mILL,OAl~1
(Written)
- /6HT &/'i T...s
r;; h1~i,~ff fI-...2,~~4-
(Authorized Signature)
II/Z?/():r
(Date)
BID SECURITY
Accompanying this Bid is a certified or cashier's check or a bid bond in the amount of 5%_ofthc bid made
payable to the Owncr which may be forfeited as liquidated damages if, in the event this proposal is
accepted, the undersigned fails to execute the Agreement and furnish and pay for the required
performance and payment bonds for the Owner within 10 calendar days after acceptance of the Bid;
otherwise said certified or cashier's check or bid bond will be returned to the undersigned.
The undersigned Bidder agrees to commence work within ten (10) calendar days after the date of written
Notice to Proceed, and further agrees to substantially complete the work within THREE HUNDRED
SIXTY FIVE (365) consecutive calendar days after the date of written Notice to Proceed subject to such
extensions of time allowed by the Conditions of the Contract.
The undersigned Bidder agrees that this Bid shall be good and may not be withdrawn for a period of sixty
(60) days after the scheduled closing time for receiving bids.
The undersigned agrees to forfeit to the Owner, as liquidated damages for each calendar day elapsing
between the date established as the date of substantial completion and the actual date of such substantial
completion of the contract work, the amount of$500.00 per calendar day.
ADDENDA
Bidder acknowledges the receipt of Addendum No.'s
11/27/07
1. #l, 2. #2 ,3. ,4. ,5.
Contractor:
Dated this 27tlday of November 2007 .
(month) (year)
Ocean Bay Construction, Inc.
2200 ~l 16th St.
pompano Beach. F1 33069
&\)t~1~ ~jJ f tf'zd;
SEAL
Address:
*
*
Attachments:
Subcontractor List
Bid Security
Trench Safety Act documentation
END OF DOCUMENT
Oct. 2007
00300-3
r "
I
I
.r
DOCUMENT 00401'
BID BOND
BIDDER (N :lme and .t1ddres~:
Ocean 'Bay Construction, Inc.
2~N'.W. 16th Str-eet
Pompano Beac'h, ~_~3306.9
SURETY.' (~rame and Address of Principal Place ofBusim~~'sl:
_...lr::....i?velers C,9sualty and Surr~ty Co~pa.ny of America
One Tower Square
, Hartfor:d, CT' 06183
OWNER (A(:tme and Address):
CITY Q.f SUNNY ISLE.S BEACH .'
". 18070 ~~Ql1ins A ve!l~_.
Sunnv.l~1es Beach. Florid~)dlJ?O
BID
- BID DUE DATE: Noyembe r 28 t h.' 2007
PROJECT: (Brh:f Description including Location):
Central Island Drainage and Street Improvement in the City of Sunny Isles Beach, Florida, hetween
Collins Ave. and Dumfoundling Causeway; 174~h Street (south limit) and 1 82nd Street (north limit)
ROND
BOND NUMBER: N ~ A n
DATE (Not later than Bid Due Date): _J~o'f,embe r 28 t h, ..-1.9 E.
PENAL SUM: _.F.:.l~~ Pe rcent ,<?..~,mount B i,.~C.? %, of Bid)
'DT WITNE~;S WHEREOF, Surety and Biddc...r, intending to be legally bound nereby, subject to the terms
printed on )lages 2 aod 3 hereof, do each cause this Bid Bond to be duly executed on its behalf by its
authorized (,fficer, agent, or rcpre~entativc.
, BIDDER
SURETY
Ocea!l Ba y Cons t ruc..~ ion, Inc.(Seal)
Bidderls Name and Corporate Sca.!
By: ~~ t!i-f f ..-e:Lt. t!/<-.~1.,
Signature and Title
Traveler Casualty and Surety
of me rica . (Seal)
e and orporate sea~. --
.____rtv ( ~." ..
Signature and Titlc Warren M. Alter
(Attach Power of Attorney) Attorrey-in-Fcrt
Please see enclosed
AttestPowe r of At torney.___,__,
Signature and Tille
By:
Attest~
- - :,:1;;4 ~~Jc#-
ignature and Title (j
~ote: (1) Above addresses Hre to he used for giving required notice.
(2) Ac.y singular reference to Bidder, Surety, Owner or other party shall be considered plural where
arrlicable.
Bid Bond, Oct. 2007
00401-1
.f'
1. Bidder and Surety, jointly and severally,
bind themsel ves, their heirs, executors,
administrators, successors and assigns to pay to
Owner upon default of Bidder any difference
between the total amount of Bidde~'s bid and the
total amount of the bid of the next lowest,
responsible and responsive bidder as determined
by Owner for the Work required by the Contract
Documents, provided that:
1.1. If there is no such next lowest, responsible
and responsive bidder, and Ovmer does not
abandon the Project, then Bidder and Surety shall
pay to Owner the penal sum set forth on the face
of this Bond, and
1.2. In no event shall Bidder's and Surety's
obligation hereunder exceed the penal sum set
forth on the face of this Bond.
2. Default of Bidder shall occur upon the failure
of Bidder to deliver within the time required by
the Bidding Documents (or any extension thereof
agreed to in writing by Owner) the executed
Agreement required by the Bidding Documents
and any performance and payment bonds required
by the Bidding Documents and Contract
Documents.
3. This obligation shall be null and void if:
3.1. Owner accepts Bidder's bid and Bidder
delivers within the time required by the
Bidding Documents (or any extension thereof
agreed to in writing by Owner) the executed
Agreement required by the Bidding Documents
and any performance and payment bonds required
by the Bidding Documents and Contract
Documents, or
3.2. All bids are rejected by Owner, or
3.3. Owner fails to issue a notice of award to
Bidder within the time specified in the Bidding
Documents (or any extension thereof agreed to in
\\'Iiting by Bidder and, if applicable, consented to
by Surety when required by paragraph 5 hereof).
4. Payment under this Bond will be due and
payable upon default by Bidder and within 30
calendar days after receipt by Bidder and within
Bid Bond, Oct. 2007
00401-2
_ -- -- -~~I
30 calendar days after receipt by BidJier and
Surety of written notice of default from ',)wner,
which notice will be given with reasonable
promptness, identifying this Bond and the; Project
and including a statement of the amount due.
5. Surety waives notice of and an: :md all
defenses based on or arising out of any time
extension to issue notice of award agreed to in
writing by Owner and Bidder, provider! ithat the
total time for issuing notice of award irlcluding
extensions shall not in the aggregate exceed 120
days from Bid Due Date without Surety'sl written
consent.
6. No suit or action shall be commenc~d under
this Bond prior to 30 calendar days after the
notice of default, as required in Paragraph 4
above, is received by Bidder and Surety 'and in no
case later than one year after Bid Due Date.
7. Any suit or action under this Bond shall be
commenced only in a court of co'mpetent
jurisdiction located in the state in WhlCh the
Project is located.
8. Notices required hereunder shall be in
writing and sent to Bidder and Surety at their
respective addresses shown on the face of this
Bond. Such notices may be sent by personal
delivery, commercial courier or by Unitctl States
Registered or Certified Mail, return receipt
requested, postage pre-paid, and shall be deemed
to be effective upon receipt by the party
concerned.
9. Surety shall cause to be attached to this
Bond a current and effective Power of Attorney
evidencing the authority of the officer, av,ent or
representative who executed this Bond ,up. behalf
of Surety to execute, seal and deliver sucn Bond
and bind the Surety thereby.
10. This Bond is intended to confoiltl to all
applicable statutory requirements. Any hpplicable
requirement of any applicable statute (hat has
been omitted from this Bond shall be d~med to
be included herein as if set forth at length. If any
provision of this Bond conflicts with any
applicable provision of this Bond confllcls with
any applicable provision of any applicable statute,
.r
then the provision of said statute shall govern and
the remainder of this Bond that is not in conflict
therewith shall continue in full force and effect.
11. The term "bid" as used herein includes a bid,
offer or proposal as applicable.
END OF DOCUMENT
Bid Bond, Oct, 2007
00401-3
--: ~
~
TRAVELERSJ
POWER OF ATTORNEY
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
_._-~
Farmington Casualt)' Company
Fidelity and Guaranty Insurance Company
Fidelity and Guaranty Insurance Underwriters, Inc.
Seahoard Surety Company
St. I)aul Fire and Marine Insurance COl11llany
Attorne)'-In Fact No.
219156
St. I'aul Guardian Insurance Company
St. Paul Mercury I nsurance Company
Travelers Casualty and Surety Company
Travelers Casualty' and Surety Company' of America
United States Fidelity and Guaranty Company
r;n1ooO')f"'I8
Certific:lte No. U U J_ --' C ,) I.,)
KNOW ALL MEN BY THESE PRESENTS: That Seaboard Surety Company is a corporation duly organized under the laws of the State of New York. that St. Paul
Fire and Marine Insurance Company. St. Paul Guardian Insurance Company and St. Paul Mercury Insurance Company are corporations duly organized under the laws
of the State of Minnesota. that Farmington Casualty Company. Travelers Casualty and Surety Company. and Travelers Casualty and Surety Company of America arc
corporations duly organized under the laws of the State of Connecticut. that United States Fidelity and Guaranty Company is a corporation duly organized under the
laws of the State of Maryland. that Fidelity and Guaranty Insurance Company is a corporation duly organized under the laws of the State of Iowa. and that Fidelity and
Guaranty Insurance Underwriters. Ine. is a corporation duly organized under the laws of the State of Wisconsin (herein collectively called the "Companies"). and that
the Companies do hereby make. constitute and appoint
Charles D. Nielson, Charles J, Nielson, Mary C, Aceves, Warren M. Alter, David R. Hoover, and Gicelle Pajon
of the City of Miami Lakes . State of Florida . their true and lawful Attorney(s)-in-Fact.
each in their separate capacity if more than one is named above. to sign. execute. seal and acknowledge any and all honds. recognizances. cnnditional undertakings and
other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the Iidelity of persons. guaranteeing the performance of
contracts and executing or guaranteeing bonds and undertakings required or permitted in any aetions or proceedings allowed by law,
IN WITNESS WHEREOF. the Companies have caused this instrument to be signed and their corporate seals to be hereto affixed. this
I I' September 2007
,ay 0
25th
Farmington Casualty Company
Fidelity and Guaranty Insurance COl11pany
Fidelity and Guaranty Insurance Underwriters, Inc.
Sea hoard Surety' Cmnpany'
St. Paul Fire and Marine Insurance Company
~~.~'(~~.[':":;,~\
{~(a' .~)
\:1-s Gol
"'~,f.,~,,~\;-~
(j~~
~fV~~,-""..f~'9
~,tORPO"...,.";:.~
~~f - '!~l
-'\ SE ilL j'>J
-?~" .,+-~..
o,'..,......'~~/
,1~~!~~
State of Connecticut
City of Hartford 'os,
St. Paul Guardian Insuranl'e Company
St. Paul Mercury Insurance Company
Travelers Casualty and Surety Company
Travelers Casualty and Surety Company' of America
United States Fidelity' and Guaranty' Company'
(i;~;;;}~\
\ t,.SE2PL/l'
0'..... .....,.
~S''''';'''''''~
"-
By:
25th September L 2007
On this the day of '. before me personally appeared George W, Thompson. who acknowledged himself
to he the Senior Vice President of Farmington Casualty Company. Fidelity and Guaranty Insurance Company. Fidelity and Guaranty Insurance Underwriters. Inc..
Seaboard Surety Company, St. Paul Fire and Marine Insurance Company. St. Paul Guardian Insurance Company. St. Paul Mercury Insurance Company. Travelers
Casualty and Surety Company. Travelers Casualty and Surety Company of America. and United States Fidelity and Guaranty Company. and that he. as such. being
authorized so to do. executed the foregoing instrument for the purposes therein contained by signing on behalf of the corporations by himself as a duly authorized officer.
In Witness Whereof, I hereunto set my hand and official seal.
My Commission expires the 30th day of June. 20 II,
58440-5-07 Printed in U,S,A,
'mw c. j~
'- Marie C, Tetreault, Notary Public
WARNING: THIS POWER OF ATTORNEY IS INVALID WITHOUT THE RED BORDER
......
I
OCEAN BAY CONSTRUCTION, INC.
SCHEDULED EQUIPMENT
ITEM #
PURCHASED
MTHNR
YE~ESCRlPTION
ID/SERIAL #
1981 Ford, 3600 tractor
CA23C Series
1994 CAT 426B Backhoe
Loader 4 x 4
1995 Homelite Pump
1995 CAT 938F Loader
1992 CAT 12G Grader
1996 Wacker Rev. Plate Compo
1995 CAT 330L Excavator
1996 Dynapac 2.5 Ton
Double Drum CC 122
1996 CAT 312 Excavator
1996 1165 Dial Grade Pipe Laser
1999 Dynapac Roller CC142
Box Blade Model BS702F
48" Tilting Bucket
1999 CAT 938G Loader
2003 Wacker Rev. Compactor
BPU3345A
2004 Bobcat 250NT KoeWer
Welder/CWECO
2004 Thompson Pump Model 26HPU-091
60HST /Southeastem Excavating
2004 Pipe LaserlLSR Inc. 5965
2004322 Bucket, Balderson 3WL48065
20043" Trash Pump W/3" hose, 90985470072
Suction discharge hose, camlockl
Blanchard Machinery
2005 Thompson Pump,
Hydraulic power rmit w/50' hose,
6" submersible pump head 32HPU-368 & 60-440
2001 CAT 312C Hydraulic CAE0215
Excavator
2007 Asphalt Zipper
01
03/1 0/93
02
03/13/97
03
04
05
06
07
08
03/12/96
05/06/98
06/1 7/96
09/1 0/99
06/17/98
09
10
11
12
13
14
15
10/02/99
07/25/96
11/10/00
05/03/93
01/31/03
04/03/03
16
08/16/04
17
08/31/04
18
19
20
08/25/04
09/15/04
10/04/04
21
01/14/05
22
08/20/05
23
03/12/07
66868
5YJ01860
160TP4
lKM00639
61M14480
725342583
2EL00476
60112329
7DK6029
3577
60211784
4073
4YS01169
1419957
LE216238
50000206
...
~
I
OCEAN BAY CONSTRUCTION, INC.
SCHEDULED AUTO/TRUCK
PURCHASED
ITEM # MTHIYR YEAR DESCRIPTION
OBCI #
In/SERIAL
01 01/27/00 1997 Ford, F250 Truck 1 FTHX26F1 VEA 72115
02 01/27/00 1997 Ford, F250 Truck 1FTHX26F3VEA72116
03 10/02/99 1988 Eager Beaver Trailer 1120HU\201JT200139
04 1972 Tagalong Trailer 10309437HK
05 02/28/03 1995 Ford, F800 Fuel Truck 1FDPF80C4SV A01420
06 05/04/02 1995 lnt'! DT66W49 4x2 1HTSDAAN7SH614144
07 03/18/04 2003 Ford, F150XL Truck 2FTRX17W63CB00572
08 08/20/05 2000 Ford F550 Utility Truck 1 FDAF56F8YEC72060
09 06/29/06 2006 Ford Crown Victoria 2F AHP74V36X1 05307
10 01/24/07 2006 Ford F250 Truck lFTNF205X6EA 72959
11 02/09/07 1999 Eager Beaver Trailer 112H5V309XL052686
12 02/09/07 2001 Eager Beaver Trailer 112H8V3251L056590
13 03/12/07 2007 Trailer for Asphalt Zipper 1 09FS03277U021 099
14 03/08/07 1997 Freightliner FL70 S/A Water Truck L856864
15 07/24/07 2007 Ford F-150 1FTVX12517NA49589
'....
I
.
-l
I
OCEAN BAY CONSTRUCTION, INC.
INVENTORY EQUIPMENT LIST
PURCHASED
ITEM # MTHIYR YEARlDESCRIPTION
ID/SERIAL #
1.
OS/25/06
2004 CAT 420D-IT Extendahoe BLNl1511
2.
05/19/07
2005 CAT 320D Excavator ARZ0422
3.
05/19/07
2004 CAT 325CL Excavator BMM0394
4
OS/23/07
2006 CAT 320D Excavator AZR0365
..
*'
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
HIGHLAND VILLAGE - LATERAL CONNECTIONS
City of North Miami Beach
17011 NE 19th Avenue
North Miami Beach FL 33162
Contact: Hiep Huynh, P.E. (305)948-2967
H icp.H uynh@citvnmb.com
Engineering Contact: C3TS-Rodney Carrera-Santana
901 Ponce de Leon Blvd. Suite 900
Coral Gable FL 33124
(305)445-2900
Installation of (22) Sanitary Sewer Laterals.
Final Contract Amount - $205,046.40
Project Commencement - January 2007
Completion Date - March 2007
.
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
HIGHLAND VILLAGE NEIGHBORHOOD IMPROVEMENTS WASTEWATER AND
STORMW A TER SYSTEMS - PHASE II A & B
City of North Miami Beach
17011 NE 19th Avenue
North Miami Beach FL 33162
Contact: Hiep Huynh, P.E. (305)948-2967
H icp. H llvnh@citynmb.com
Engineering Contact: C3TS-Rodney Carrera-Santana
901 Ponce de Leon Blvd. Suite 900
Coral Gable FL 33124
(305)445-2900
3,470 L.F. 8" PVC Gravity Sewer Piping, 14 Precast Concrete Sanitary Sewer Manholes, 124 Service
Laterals, 515 LF Storm Sewer Pipe (15"-20" & 24"-42"), 12 Precast Concrete Storm Sewer Structures.
Original Contract Amount - $2,672.328.50 (A, B, & C)
Final Contract Amount - $1,030,455.09 (A & B)
Project Commencement - January 2006
Completion Date - April 2006
HIGHLAND VILLAGE NEIGHBORHOOD IMPROVEMENTS WASTEWATER AND
STORMW A TER SYSTEMS - PHASE I
City of North Miami Beach
17011 NE 19th Avenue
North Miami Beach FL 33162
Contact: Hiep Huynh, P.E. (305)948-2967
Hiep.I Illvnh@citvnmb.com
Engineering Contact: C3TS-Rodney Carrera-Santana
901 Ponce de Leon Blvd. Suite 900
Coral Gable FL 33124
(305)445-2900
10K LF of Sanitary Sewers, (1) Sewage Pump Station, 1,500 LF of Forcemain, 4,500 LF of Storm
Sewers, (3) Stormwater Treatment Units, (1) Stormwater Pump Station and (1) Stormwater Drainage
Well.
365 Calendar Days
Original Contract Amount - $5,609,005.50
Final Contract Amount - $5,897,883.83
Project Commencement - July 2004
Completion Date - December 2005
2
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
SPANISH VILLAGE COMMERCIAL AREA PROJECT, PHASE I
City of Boca Raton
1401 Glades Road
Boca Raton FL 33431
Contact: Jim Pierce (Utilities Dept.) (561)338-7308
i pierce{{V,ci. boca-raton. fl. us
Engineering Contact: Hazen & Sawyer
2101 Corporate Blvd.
Boca Raton FL 33431
Project Manager - Felipe Martinez (561 )997-8070
F. Marti nez@hazenandsawycr.com
8" Sanitary Sewer 0-14 Cut, Sanitary Manholes 0-14' Cut, 8" DIP 4,100 LF, Fire Hydrant &
Assemblies, Jack & Bore, Lift Station 24" HOPE Stormwater 2,760 LF, Stormwater Inlets Type G, F &
6, Asphalt & Sod.
270 Calendar Days
Original Contract Amount - $1,630,828.90
Present Contract Amount - $1,646,492.49
Completion Date - February 2005
PLANTATION/SUNRISE HEIGHTS WATER MAIN REHABILITATION PROJECT
City of Plantation
400 NW 73 A venue
Plantation FL 33317
Contact: Hank Brietenkam, Assistant Director of Utilities (954)797-2209
h bri eten kam{{V,p lantati on .org
Engineering Contact: Hazen & Sawyer
4000 Hollywood Blvd. Suite 750 N
Hollywood FL 33021
Project Manager - Michael Wengrenovich (954)987-0066
m wengrcnov i c h{{V,hazenandsawver. com
6" - 8" PVC Pipe 11,000 LF, 6" - 8" Gate Valves, Fire Hydrant Assemblies, Single & Double Water
Main Services, Water Service Connection, Concrete, Asphalt, Plumbing.
150 Calendar Days
Original Contract Amount - $732,666.00
Final Contract Amount - $666,879.79
Project Commencement Date - March 15, 2004
Completion Date - December 2004
3
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
MUL TIPLE AWARD INDEFINITE QUANTITY CONTRACT FOR STORM DRAINAGE &
PA VING 629033-COI-DERM-EEC
Miami-Dade County, FI
DERM!DORM FEMA Project
111 NW 1 Street, Suite 2110
Miami FL 33128
Contact: Rolando Martin, Project Manager (305)372-6280
Eduardo Vega, P.E. (305)372-6401
vegae@miamidade.l2.ov
18" Diameter Storm Sewer PEP (Various Depths), 15" Diameter Storm Sewer PEP, 18" French Drain
(Various Depths), D-3 Inlets @ Various Depths, D-l Inlets, P-7T Manholes, PlO Inlets, Flowable Fill,
Limerock, Asphalt, Sidewalks & Sod.
730 Calendar Days
Original Contract Amount - $5,000,000.00
Final Contract Amount - $4,784,190.91
Contract Completion - October 12, 2004
V ALENCIA GARDENS A VENUE & WESTPORT ROADWAY IMPROVEMENTS
Northern Palm Beach County Improvement District
357 Hiatt Drive
Palm Beach Gardens FL 33418
Contact: Timothy Messler
tim((l),mcssassoc.com
Messler & Associates (Engineer of Record)
7741 N Military Trail, Suite 5
Palm Beach Gardens FL 33410
(561 )841-8188
Storm Drainage (18" - 30" RCP & 48" CAP), Type P-5, P-6, P-9, P-7T, D-3 Inlets, Water (4" - 8"
DIP), Wastewater (8" DIP 0'-10' Cut, 8" PVC 0' - 12' Cut), Fire Hydrants & Assemblies, Type F & D
Curb, 12" Stabilization, Asphalt, Sod, Signs & Lines.
210 Calendar Days
Original Contract Amount - $848,021.52
Final Contract Amount - $878,633.35
Final Contract Date - February 2004
4
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
NORTH COUNTY NEIGHBORHOOD IMPROVEMENT - BID PACKAGE NO.1
Broward County Board of County Commissioners
Broward County Office of Environmental Project No. 1152/8629
2555 West Copans Road
Pompano Beach FL 33069
Contact: Patrick Sweet, Project Manager (954)831-0973
Rolando Nigaglioni, P.E. (954)831-0963
rnigaglioni@broward.org
Drainage Pipe (18" RCP) 5,834 L.F., Catch Basins, Water (6" DIP 16,687 L.F.), Gate Valves (6"),
Service Connections (Double & Single), Sanitary Sewer Pipe (8" PVC 0-10' Cut 17,382 L.F.), Sanitary
Sewer Maintenance Access Structures, Sewer Services (40,656 L.F.), Force Main (6" 1,027 L.F.), Lift
Station, Limerock Base Material, Asphalt, Concrete Sidewalks/Driveways, Landscaping & Pavement
Markings.
365 Calendar Days
Original Contract Amount - $3,829,223.96
Final Contract Amount - $4,318,902.73
Final Completion Date - April 2002
T AMARAC EAST UTILITIES UPGRADE - PHASE 1
City of Tamarac
6001 Nob Hill Road
Tamarac FL 33321-2401
Contact: John Doherty, P.E. (954)724-2514
Water (8" DIP 3,900 L.F.), 8" Gate Valves, Single Water Main Services, Double Water Main Services,
Water Service Connections, Fire Hydrant Assembly, Sample Points, Air Release Valves, Sanitary Sewer
(8" PVC 2,600 L.F.), Sanitary Sewer Laterals (6" PVC), Septic Tank Abandonment (73 Ea.), Manholes,
VCP Abandonment, Excavation, Limerock Base & Asphalt.
180 Calendar Days
Original Contract Amount - $867,786.00
Final Contract Amount - $830,628.80
Final Completion Date - March 2002
5
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
CONSTRUCTION OF W.M. AERIAL CROSSING @ OLET A RIVER & SR826
City of North Miami Beach
17011 NE 19 Avenue
North Miami Beach FL 33162-3100
Contact: Karim Rossi (305)948-2980 Ext. 7962
Karim .rossi@citynmb.com
30" Water Main Transmission Main Steel Pipe Replacement and Removal of Existing 16" and 8" Water
Mains.
45 Calendar Days
Original Contract Amount - $178,485.00
Final Contract Amount - $178,485.00
Actual Contract Completion Date - February 26, 2002
FOURTH STREET 30-INCH WATER MAIN
City of West Palm Beach
1000 45th Street, Suite 15
West Palm Beach FL 33407
Contact: Laura Le, P.E. (561)659-8040
Water Main (30" Cement-Lined DIP 810 L.F.), 20" x 20" Tapping Sleeves, 30" x 20" Reducers, Sample
Points, Temporary Blow-Off Assembly, Fire Hydrant, Concrete Curb Gutter, Concrete Sidewalks,
Dewatering, Water Main (24" DIP Push-On 320 L.F.), 30" x 30" x 20" Tee, 24" Valves, 2" Temporary
Blow-Off Assembly & Gate Valves (20").
60 Calendar Days
Original Contract Amount - $271,931.50
Final Contract Amount - $386,354.37
Original Contract Completion Date - May 13,2001
Actual Contract Completion Date - July 24, 2001
6
--l
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
LAUDERDALE BY -THE-SEA FORCE MAIN IMPROVEMENTS
City of Pompano Beach
1190 NE 3 Avenue
Pompano Beach FL 33060
Contact: Randall Fowler (954)786-4098
Randall. fowler~v,copbfl.com
Drainage, Air Release Valves, Concrete, Curbing & Asphalt
90 Calendar Days
Original Contract Amount - $325,939.99
Final Contract Amount - $300,149.47
Original Contract Completion Date - August 5, 1998
Actual Contract Completion Date - October 9, 1998
SW 13 COURT WATER MAIN EXTENSION
City of Pompano Beach
1190 NE 3 Avenue
Pompano Beach FL 33060
Contact: Randall Fowler, P.E. (954)786-4098
Water Main PVC, Water Main DIP, Jack & Bore, Gate Valves
60 Calendar Days
Original Contract Amount - $69,175.00
Final Contract Amount - $66,986.63
Original Contract Completion Date - August 20, 1999
Actual Contract Completion Date - August 11, 1999
7
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
PARK CITY BOOSTER STATION FORCE MAIN
City of Sunrise
14150 NW 8 Street
Sunrise FL 33325
Contact: Tom Kelleher, P.E. (954)845-1010
Engineering Contact: Camp Dresser & McKee, Inc.
1601 Belvedere Road
West Palm Beach FL 33406
Project Manager - Lawrence E. Martin, Jr.
(561)689-3366
18" - 20" DIP 26,000 L.F. Installed Along South Florida Water Management Easement, Wet Taps,
Directional Drilling, Asphalt & Landscaping.
360 Calendar Days
Original Contract Amount - $2,449,230.50
Final Contract Amount - $2,843,726.66
Commencement Date - August 17, 1998
Original Contract Completion Date - August 12, 1999
Actual Contact Completion Date - August 12, 1999
STATE ROAD 7 RELOCATION
City of Margate
1001 W River Drive
Margate FL
Contact: Utilities Dept. (954)928-0828
Engineering Contact: Craig A. Smith & Associates
1000 W McNab Road
Pompano Beach FL 33069
Present Employer: Craven & Thompson Engineering
4350 Hallandale Beach Blvd.
Pembroke Pines FL 33023
(954)739-6400
Road Widening & Reconstruction Consisting of Drainage, Concrete Structures, Jack &
Bore, Concrete, Paving, Night Time Crossings, Pavement Markings & Landscaping.
150 Calendar Days
Original Contract Amount - $1,085,974.34
Final Contract Amount - $1,120,460.47
Original Contract Completion Date - March 1996
Actual Contract Completion Date - March 1996
8
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
EAST STUART PHASE II REHABILITATION WATER, WASTEWATER
City of Stuart
121 SW Flagler Avenue
Stuart FL
Engineering Contact: Lindalhl Browning & Associates
2400 SE Monterey Road #300
Stuart FL 34996
Project Manager - Steven Doyle, P.E. (561 )286-3883
sdovle@ircgov.c
Present Employer:
Indian River County, Utilities Dept.
1840 25th Street
Vero Beach FL 32960 (561)770-5325
Installation of Drainage, Paving, Concrete, Lake Excavation, Grading & Landscaping
365 Calendar Days
Final Contract Amount - $1,629,443.64
Commencement Date - May 1996
Final Contract Completion Date - May 1997
EFFLUENT REUSE PIPELINE ROAD ROUTE
City of Hollywood
1471 Taft Street
Hollywood FL
Contact: (954)967-4225
Removal of Existing System Replacing with Reuse Pipeline
180 Calendar Days
Original Contract Amount - $697,716.00
Final Contract Amount - $644,684.00
Commencement Date - January 5, 1994
Original Contract Completion Date - September 10, 1994
Completion Date - November 30, 1994
9
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
REMOV AL OF EXISTING LEAD SERVICES
City of Miami Beach
1700 Convention Center Drive
Miami Beach FL 33139
Contact: David Cates (305)673-7080
Removal of Existing Lead Services Replacing With Driscoll Pipe.
240 Calendar Days
Final Contract Amount - $499,000.00
Final Contract Completion Date - May 2, 1996
COMMUNITY DEVELOPMENT BLOCK GRANT SUAREA
City of Boynton Beach
100 E Boynton Beach Blvd.
Boynton Beach FL 33435
Contact: Michael Kazunas (561 )734-8111
Redevelopment of Neighborhood Installing Storm Drainage. CAP Pipe (24" 3,000 L.F.), Catch Basins,
Manholes, Fire Hydrants, Water & Sewer House Connections, C-900 PVC Pipe (12" 1,000 L.F.), Site
Clearing, Excavation, Limerock Base, Paving, Irrigation & Landscaping.
210 Calendar Days
Original Contract Amount - $512.881.66
Final Contract Amount - $512,881.60
Commencement Date - April 14, 1992
Original Contract Completion Date - November 30, 1992
Actual Contract Completion Date - November 30, 1992
10
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
DISTRICT II WATER METER INST ALLA TION
Broward County Board of County Commissioners
Broward County Environmental Division
2555 W Copans Road
Pompano Beach FL 33069
Contact: Joe Tanacredi (954)831-0983
Removal and Installation of Water Meters
210 Calendar Days
Original Contract Amount - $229,525.00
Final Contract Amount - $267,072.11
Commencement Date - November 4, 1994
Final Completion Date - March 30, 1996
COLLINS A VENUE 24" WATER TRANSMISSION MAIN PHASE II
City of North Miami
17011 NE 19 Avenue
Miami Beach FL 33 I 62
Contact: (305)948-2967
Installation of24" Water Transmission Main.
36 Calendar Days
Original Contract Amount - $96,678.09
Commencement Date - October 3, 1994
Final Contract Amount - $108, 542.44
Final Completion Date - November 8, 1994
11
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
TRADE~NDSESTATES
Palm Beach County
PO Box 21229
West Palm Beach FL 33416-1229
Contact: Carl Miller (561)684-4000
C-900 PVC (8" 0 - 14' 3,000 L.F.), Manholes, Catch Basins (0 - 16' 50 Ea.), RCP Pipe (15" - 30"
3,000 L.F.), DIP (6" - 8" 8,000 L.F.), Fire Hydrants, Water & Sewer House Connections, Installation of
Pump Station at 24' Depth, Limerock Base, Concrete, Paving, Irrigation & Landscaping.
240 Calendar Days
Original Contract Amount - $913,864.96
Final Contract Amount - $914,740.17
Commencement Date - January 4, 1993
Original Contract Completion Date - October 1, 1993
Final Contract Completion Date - November 14, 1994
TURN LANE AT SE 5 STREET & SE 3 AVENUE
Broward County Board of County Commissioners
115 S Andrews Avenue
Ft Lauderdale FL 33301
Contact: George EdwardsIDarwin Townsend
(954)357-6280
Realignment and Reconstruction Project consisting of Excavation, Sub grade, Limerock Base, PCP
Drainage, Curb & Gutter, Paving, Concrete Sidewalks, Landscaping & Demolition of2-Story Building.
180 Calendar Days
Final Contract Amount $333,445.00
Commencement Date - January 26, 1991
Final Contract Completion Date - August 16, 1991
12
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
LINCOLN AVENUE IMPROVEMENTS
City of Opa-Locka
777 Sharazad Blvd.
Opa-Locka FL 33054
Contact: Ramon Castella (305)445-2900
Realignment & Reconstruction Project Consisting of Water Main Installation (24" CAP Pipe 2,000
L.F.), Structures, Fire Hydrants, Valves, Excavation, Limerock Base, Irrigation, Concrete Curb &
Gutter, Landscaping.
Final Contract Amount - $227,575.42
Commencement Date - December 16, 1991
Final Contract Date - March 23, 1992
LOCAL DRAINAGE IMPROVEMENTS - PROJECT NO. E-63
City of Miami
Dept. of Public Works
275 NW 2 Street
Miami FL
Contact: Bob Richmond (305)579-6856
Reconstruction of20 Various Locations within the City of Miami. Exfiltration Drainage, Structures,
Curb & Gutter, Limerock Base & Asphalt.
Final Contract Amount - $520,374.96
Commencement Date - July 13, 1990
Final Contract Date - April 1, 1991
FORT DALLAS PARK RECONSTRUCTION
City of Miami
275 NW 2 Street
Miami FL
Contact: A.J. Leukanech (305)579-6856
Reconstruction of Park including installation of equipment, pumps, pavers & landscaping.
Final Contract Amount - $331,943.92
Commencement Date - February 17, 1987
Final Contract Date - February 10, 1988
13
.
&
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
SE 21 AVENUE PARKING LOT RECONSTRUCTION
City of Deerfield Beach
150 NE 2 Avenue
Deerfield Beach FL
Contact: Dale Holinbech (954)480-4200
Reconstruction of Existing Parking Lot. Installation of New Meters, Parking Bumpers, Guardrails,
Asphalt, Pavement Markings & Landscaping.
Final Contract Amount - $285,866.53
Commencement Date - August 10, 1987
Final Contract Date - February 15, 1988
FLAGLER DRIVE WATER MAIN IMPROVEMENTS
City of West Palm Beach
1000 45th Street, Suite 15
West Palm Beach FL 33407
Contact: Jeff Halverson (561)659-8040
Rehabilitation of Drainage System and Roadway. 12" Water Main Interconnect. DIP (12"
approximately 1 mile.), Fire Hydrants & Valves.
Final Contract Amount - $426,505.93
Commencement Date - November 9, 1988
Final Contract Date - May 17, 1989
14
.
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
ALLEY PAVING & WATER MAIN IMPROVEMENTS
City of Hollywood
1471 Taft Street
Hollywood FL
Contact: Sidney Dick (305)921-3254
Water Main and Alley Rehabilitation. Tie-Ins, Pressure Testing, Chlorination & Alley Reconstruction.
Final Contract Amount - $123,278.89
Commencement Date - August 24, 1989
Final Contract Date - November 1, 1989
NW 15 AVENUE IMPROVEMENTS PROJECT NO. F -3570
City of Ft Lauderdale
100 N Andrews A venue
Ft Lauderdale FL 33301
Contact: Ted Voda (954)761-5077
Reconstruction and Removal of Median Consisting of Site Clearing, Excavation, Limerock Base,
Irrigation, paving & Landscaping.
Final Contract Amount - $191,308.47
Commencement Date - August 12, 1991
Final Contract Date - December 6, 1991
CROSS ROADS PARKING & UTILITY
City of Ft Lauderdale
100 N Andrews A venue
Ft Lauderdale FL 33301
Contact: John Maleck (954)761-5077
Drainage, Catch Basins, Concrete, Curbing & Asphalt.
90 Working Days
Original Contract Amount - $194,503.00
Final Contract Amount - $209,671.44
Final Completion Date - July 14, 1997
15
.
01.
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
DRAINAGE PIPE REPLACEMENT
City of Dania Beach
1 00 West Dania Beach Blvd
Dania Beach FL 33004
Contact: (954)921-8700
41" Couplings, 42" Poly Drain Pipe & Bends.
60 Calendar Days
Original Contract Amount - $57,630.00
Final Contract Amount - $57,630.00
Original Contract Completion Date - May 28, 1999
Actual Contract Completion Date - May 28, 1999
ROADWAY MODIFICAITON SW 36 TERRACE, BETWEEN SW 16 STREET & SW 17
STREET
City of Ft Lauderdale
100 N Andrews A venue
Ft Lauderdale FL 33301
Contact: John Maleck (954)761-5077
Restructuring & Improvements to Various Medians.
90 Calendar Days
Final Contract Amount - $56,315.07
Commencement Date - July 7, 1993
Original Contract Completion Date - December 20, 1993
Actual Contract Completion Date - December 20, 1993
16
..
..
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
RIVERSIDE PARK NEIGHBORHOOD MASTER PLAN - MODIFICAITON #F-3210-A
City of Ft Lauderdale
Public Works Dept.
100 N Andrews A venue
Ft Lauderdale FL 33301
Contact: Jack Mellen (954)761-5046
Road Closures, Street Restructuring & Landscaping.
90 Calendar Days
Final Contract Amount - $22,780.60
Commencement Date - June 20, 1990
Original Contract Completion Date - September 7, 1990
Actual Contract Completion Date - September 7, 1990
IMPROVEMENTS TO DONALDSON PARK
City of Coconut Creek
4800 W Copans Road
Coconut Creek FL
Contact: Garth Hinkle (954)973-6784
Dockage & Boat Ramp Replacement, Landscaping, Lake Restoration & Excavation, Remove & Replace
Concrete Culverts.
Final Contract Amount - $68,805.30
Commencement Date - May 14, 1990
WATER SERVICE WATER MAIN EXTENSIONS
Town of Ocean Ridge
6450 N Ocean Blvd
Ocean Ridge FL
Contact: Jacob Cooper (561)969-0940
Water & Sewer Improvements.
90 Calendar Days
Final Contract Amount - $112,522.81
Commencement Date - November 7, 1989
Original Contract Completion Date - February 9, 1990
Actual Contract Completion Date - February 9, 1990
17
.
.
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
NORTH SWINTON AVENUE IMPROVEMENTS
City of Delray Beach
434 S Swinton Avenue
Delray Beach FL
Contact: George Abou-Jaoude (561)243-7340
Drainage Improvements, By-Pass Pumping & Canal Imbankment Restoration @ Various Locations
Within the City of Delray Beach.
90 Calendar Days
Final Contract Amount - $217,690.00
Commencement date - February 6, 1989
Original Contract Completion Date - June 1, 1989
Actual Contract Completion Date - June 1, 1989
CITY WIDE ADJUSTMENTS MANHOLE PROJECT
City of West Palm Beach
PO Box 3366
West Palm Beach FL
Contact: Jeff Halverson (561)659-8040
Manhole Adjustments Within Various Areas of the City of West Palm Beach.
90 Calendar Days
Final Contract Amount - $51,925.00
Commencement date - November 9, 1988
Original Contract Completion Date - March 10, 1989
Actual Contract Completion Date - March 10, 1989
SOLAR DRIVE CUL-DE-SAC IMPROVEMENTS
City of Ft Lauderdale
100 N Andrews A venue
Ft Lauderdale FL 33301
30 Calendar Days
Final Contract Amount - $19,100.00
Commencement date - October 10, 1988
Original Contract Completion Date - November 4, 1988
Actual Contract Completion Date - November 4, 1988
18
.
"
OCEAN BAY CONSTRUCTION, INC.
COMPLETED PROJECTS
HOUSING AUTHORITY IMPROVEMENTS
West Palm Beach Housing Authority
3801 Georgia Avenue
West Palm Beach FL
Contact: Bill McLaughlin (561)655-8530
Drainage Area Improvements, RCP, Asphalt, Concrete & Landscaping
180 Calendar Days
Final Contract Amount - $416,593.56
Commencement date - March 14, 1988
Original Contract Completion Date - August 10, 1988
Actual Contract Completion Date - August 10, 1988
LOCAL DRAINAGE IMPROVEMENTS - CONTRACT #38
Metro-Dade County P.W. Dept.
III NW 1 Street
Miami FL
Contact: Richard Mendez (305)375-2113
Water, Drainage, Force Main, Catch Basins, Concrete, Asphalt & Landscaping.
90 Calendar Days
Final Contract Amount - $256,201.26
Commencement date - November 9, 1987
Original Contract Completion Date - March 7, 1988
Actual Contract Completion Date - March 7, 1988
STATE ROAD 7, BETWEEN BROW ARD BLVD & PETERS ROAD, WIDENING PROJECT -
FIRE HYDRANT ADJUSTMENT - FAST TRACK PROGRAM
City of Plantation
400 NW 73 A venue
Plantation FL 33317
Contact: (954)797-2209
Relocate 10 Fire Hydrants, Install 2 - 12" Stubs.
Original Contract Amount - $29,287.00
Final Contract Amount - $35,436.98
19
<J :_ft..~#.~f ~~l;?;2f'~'~~t~.t..~;;~'2'--~;!Ztt;::~~}~~::~)~~~~t$;~~,~'6!.~.!:,..'~~:,,.;...., '"!7',o ~1;S: ._',.,
:~;f......- . ..-.... '- 7 y.~- 3,#--.~1 r-'\I'~v'-~.'''''' .i.:'L~ ~"',J("""il'tf'; J -~ 1=)~~4ft..~~a ....~1~.. _ C"-"'~...""e.... ,..Ji" _ 3.. '" _" ,
~~_t.? .~;, ~', \'~;;. ~~<~ ,'~:kIDEP;~R'BlEl.~.L'\(:;~~~,B " .. -j;.'j' ~SSfLCll'1A:D REGULATION
-{(;:i.i~{? .~I'{ ~j~::-"~tr~,/~lt;:~~.~::;j:~~~~NS~ .. oR ~, ' ;€E~j[NG::.~BOAR]j,c ,:f'_"', SEQ#L07062300J:
~{~~~~:~~ ~';'-' 1~i,q~g)t~;2'~~;;:;~!o.~t;~~~~~~~ ~~i~'f~~~J;: ~:;~k~~\;:/: :V~;2":~~;;- 'g.: ;~:~?:' -"
:;'~'06:;i:.~j'::'ij\~ior15;!5'a~~6~1~~1~~J5J! s';iooy~;g~r~
,,:,:,:\',,'1'< 'T:h "'i' ...".."'E"";""'(R:""'~~~' ""'Ii!m'<"~"""""""~' "./
":\},:;t;;~a:iIR~~~~~~~~~~:~ij.~t~ ' "
~~gll_lll~~~; .~ytt:i:~; Ii. -': C
, ''''22 0 O.'..:NW..;16ST/..-;..;.-/;.."'.._,.,..,."h..I,'_,,'~""'!:.y.'"..!.",;;))1..,,'..,'''''.'>'''' COO "...........--,., ...~..- .~, '
~~!lrclJilrilrjJlet~I~~,
~',::HOLLY' BENSON
':,;:< >SECRETARY
.--::-;,J-:"""-...,......"...,...-.-,...,...,..,-...:~..-:--""'-.:;:-"'.~.~=.'..,..C-7.,'7;'..,:-....,.._...-~~-,,"'"'__.~...,-.,_.~~__;--_.,...,...~~......~~~~~.~...........~.-.....__.~__'_~,........,..."...-,--=,....::'~.........,..~........,-._~..,...,..,...."......,.--__
......""-'-~ '.", . P<-";:;..c...._~;,~.. . ....:.."o(..^. ,'_;:"J',':"""~,~"'('"'' .....~ ".' ~,"'';'
u.,..-__ u_
.,.~.....~~.;.<,~ -:.;r.t' .'"
. ':;.:,. _ o";:;i ,,:-,,"'~=___u
~,I~:~tconSlrucE!g!~ing Board
BUSINESS CERllACATE OF COMPETENCY
I: . .. .
Is certified under the provisions of Chapter 10 of Miami-Dade County
E1522
Exp. Date: 09/30/2009
PRCHAL MATTHEW J
OCEAN BAY CONSTRUCTION, INC
D.B.A.:
--.-----:-:---:.:.-----:;:-:--"""7;-.-~:,'"'"'.-:._:~:-._~_:::---,~..-:;-;-ry:...
..".~.-~ ---~. --.'-- - ---- --- --"- ..""'- ""'--"---"'-'
MIAMI-DADE COUNTY
TAX COLLECTOR
140W. FLAGLER ST.
14th FLOOR
MIAMI, FL 33130
2007 LOCAL BUSINESS TAX RECEIPT 2008
MIAMI-DADE COUNTY - STATE OF FLORIDA
EXPIRES SEPT. 30, 2008
MUST BE DISPLAYED AT PLACE OF BUSINESS
PURSUANTTO COUNTY CODE CHAPTER 8A - ART. 9 & 10
FIRST-CLASS
U.S. POSTAGE
PAID
MIAMI, FL
PERMIT NO. 231
THIS !S NOT A BILL-DO NOT PAY
092250-1
BUSINESS NAME I LOCATION
OCEAN BAY CONSTRUCTION INC
DOING BUS IN DADE CO
RENEWAL
LICENSE NO. 092250-1
CC # E1522
OWNER
OCEAN BAY CONSTRUCTION INC
Sec. Type of Business
196 SPECIALTY ENGINEERING CONTRACT
THIS IS ONLY A lOCAL
BUSINESS TAX RECEIPT. IT
DOES NOT PERMIT THE
HOLDER TO VIOLATE ANY
EXISTING OR REGULATORY
OR ZONING lAWS OFTHE
COUNTY OR CITIES. NOR
~p. ~~.! L E.. ~,EMnP 'L! '!~
WORKER/S
10
DO NOT FORWARD
QUALIFYING TRADE/51
0003 PIPE LINE ENG
0007 PAVING ENGINEERING
0008 CONCRETE ENGINEER
0009 EXCAU & GRADING ENG
i \lIINW.miamidade.govlbuildingcode
ITEM NO.
102-3
102-71-11
102-71-21
104-13-1
110-3-7
110-4-1
110-4-1-1
120-1
230-2
425-1-331
425-1-341
425-1-351
425-1-361
425-1-521
425-1-541
425-1-542
425-1-671
425-2-42
425-5-42
425-5
430-171-123
430-171-124
430-171-129
430-941
440-1-60
730-70D
CONTRACTOR'S WORK (ii) 40% OF BID
AMOUNT
$ 37,400.00
$ 9,700.00
$ 2,925.00
$ 5,000.00
$ 6,000.00
$ 12,980.00
$ 7,595.00
$ 63,990.12
$ 118,368.00
$ 4,796.00
$ 6,046.00
$ 37,368.00
$ 89,244.00
$ 84,942.00
$ 139,456.00
$ 5,413.00
$ 24,290.00
$ 109,876.00
$ 13,353.00
$ 14,500.00
$ 11,308.50
$ 599,964.00
$ 302,280.00
$ 5,000.00
$ 214,635.00
$ 223,960.00
$2,150,389.62
,J
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
Mandatory Pre-Bid Conference Summary Minutes
October 31, 2007 at 10:00 a.m.
*** IMPORTANT ***
The bid opening date has been rescheduled to Wednesday, November 28th, 2007 at 10:00 am.
Requests for clarifications and questions must be made in writing to Hugo Guevara
(hguevara@bhaengineers.com) with a copy to Jane Hines, City Clerk (ihines@sibfl.net) and
will be accepted until 5:00 pm on Monday, November 19th, 2007.
In Re: Bid No. 07-10-02 (Central Island Drainage and Street Improvements)
City Clerk Jane A. Hines, CMC, opened the Pre-Bid Conference and introduced Hugo Guevara of
Beiswenger, Hoch and Associates who presented an overall description of the project noting that this
project is strictly related to specialized drainage with deep wells. He reminded the contractors that
the deadline for submission of bid documents is "'ednesday, Noyember 14,2007 at 10:30 a.m. ,
2007 at 10:00 a.m., at whieh time we will publiely open those sealed bids. Any additional
questions must be submitted in writing up to five business (5) days before the bid opening date.
Participants of today's meeting will be copied on all answers to written questions, as stated in
Section 100.
The following questions and answers, copies of revised plans and Bid Documents constitute
ADDENDUM NO.1.
QUESTIONS AND COMMENTS FROM PROSPECTIVE BIDDERS
1. This bid was bid out once before, why wasn't it awarded? Do you anticipate that it will
happen again?
The bid was advertised but cancelled, before anyone submitted bids, because funding
documents had not been correctly prepared so we missed the grant funding cycle. No,
the City does not anticipate that to happen again because funding is in place.
2. When is the projected start date?
It is anticipated to start the first Monday in .January 2008 (.January 7, 2008).
3. Have all permits and easements been obtained?
The City will issue the construction permits. In reference to the drainage, the City has
already obtained a well permit from DERM. The City has not applied for a FDEI>
permit yet. The General Contractor must pay for DERM and FDEP well construction
permits. Construction permits will be reimbursed by the City (approximately $750.00
and $200.00 per well for FDEP and DERM respectively).
4. Is there a long lead time to obtain permits?
DERM's permit is available immediately. FDEP's will take approximately 4 to 6
weeks, minimum.
Bid07 -1 0-02Pre- BidCon ferenceQ A(2),doc
Page 1 of 7
5. What are the fees for Sunny Isles Beach Police Officers? If SIB Police is not available, can
we use State Troopers?
The Contractor must use Sunny Isles Police officers, unless othenvise appr(wed by the
City of Sunny Isles Police Department (Sandra Block is the contact person and may be
reached at 305.792.1839).
If no City Officer"s are available, others may be approved by the City. Fees are $40.00
per Officer/Hour for regular days and $60.00 per Officer/Hour during holidays.
6. Are there any requirements for notification to homeowners?
Yes. Contractor must notice homeowners and must hold public awareness meetings.
7. Will the City pay for testing of density and concrete?
Refer to DIVISION I, GENERAL SPECIFICATIONS, Section 7, Payment of Test by
City.
8. Will the City pay for stored materials?
NO.
9. What is the current condition of the existing drainage pipes to be desilted? What percentage
of the pipe is filled with dirt?
Pipes to be desilted have been identified on plans attached to this Addendum.
10. Should structures be included too (in case they need to be cleaned) or will there be a new bid
for that?
The cost of drainage structure desilting should be included in the pipe desilting unit
price.
11. Is there any exfiltration of the pipe or is it all solid for drainage?
No exfiltration pipes are used in this project. The project requires all solid pipes for
drainage.
12. There are existing drainage pipes shown on the plans that are not labeled to be removed. Is
there any intent for these lines, perhaps abandonment?
Existing drainage pipes not labeled to be removed are to remain. See Sheet # 5 Note #5
of the construction plans.
13 . Would you consider muck removal as part of that?
No excavation is considered for remaining pipes. For new sewer construction: use
special type of pipe bedding as indicated on sheet #37.
14. Paving: there are two types of road, curb and gutter, and you have a specific type of material,
you ask for 1" milling, 2" resurfacing, and remove the existing pavement to approximately
1", use type S-1 asphalt concrete.?
Use Type S-1 Mix, as per Miami-Dade County standards.
Bid07 -1 0-02Pre- BidCon ferenceQ A(2),doc
Page 2 of 7
.'
15. You also say you want a 2% slope. Sometimes you can't follow that.
Refer to Sheet # 5,
16. It has a lot of curb and gutter but type S-l asphalt concrete is not recommended to be used to
mix for this final course any more.
llse of Type S-1 mix in final course is approved by Miami-Dade County.
17 . We need clarification on doing half of the street then the other half. In bidder's opinion, it
won't work!
The Contractor may provide its own MOT plans. City will review and approve, as
required, hut access must be maintained for I'esidents at all times.
18. What is the City's estimate for this project?
$3.9 Million Dollars.
19. Are there any restrictions for noise or lane closures?
Specific working hours are indicated in the bid documents; however, the City will
consider special circumstances. Both extended worl{ hours and lane closure permits
are handled by Robert Solera, Communit)' Development Director, who may he reached
at (305) 792-1789 or rsoleraltV,sibfl.net.
20. Is there any incentive/disincentive for damages or liquidated damages?
YES, liquidated damages. The incentive is limited to $1,500 per day, not to exceed
$100,000.00, if job is completed before the end date and the project is ready before the
final payment date.
'(
-e
21. Quality control of product by the City or contractor?
The contractor is responsible for quality control. The City reserves the right to verify
all products.
22. Does that include asphalt?
YES.
23. Is there any known contamination?
NO.
24. Drainage Wells: Add a lump sum on each? Include structure? There is no information on
the well itself. Is it longer or shorter than 200', 120' ISO'?
Payment for drainage wells was itemized. Refer to Summary of Quantities sheet.
25. The plan indicated a significant band of muck. It is marked as an elevation. This may not be
desirable where drainage is: excavation item to use for removal and disposal?
Refer to Sheet 37 for pipe bedding. Also, see note #17 on Sheet # 5
26. Clarification: In the event that there is muck with elevation below the pipe, should we build
Bid07 -1 0-02Prc-I3idConfcrenccQ A (2),doc
Page 3 of 7
.
pipe on muck? Is there going to be a requirement to over excavate and provide for a
foundation?
Do not build on muck. Cost of trench excavation, disposal of excess of material
removal, backfill with suitable selected material, reposition of pavement, landscaped
areas, "SHALL BE INCLUDED IN THE UNIT PRICE FOR SEWER
CONSTRUCTION", and comply with FOOT governing standards and specifications as
stated.
27. Where is the draincrete called out to under drain details to be used, and what are the limits
and dimensions for the draincrete? A draincrete is porous concrete that allows water to go
through as we saw in the plans - it wasn't in the list of items - they found it somewhere else.
Draincrete requirements were removed from Swale Trench Detail (Underdrain) on
Sheet # 37. "DO NOT USE DRAINCRETE".
28. Is the City using FDOT or County specifications? It makes a difference in price.
Use Miami-Dade County specifications standards. Price adjustments for asphalt will
be as indicated in DIVISION II, Special Provisions, Section 27, Bituminous Material-
Payment Adjustment.
29. Milling for depth or for crossroad correction?
Milling for depth.
30. Widening and type crossings are shown but there are no mentions of asphalt work. What is
the City's intent in those areas? There are a couple of milling and resurfacing areas. Are you
going to leave it?
Whatever we are resurfacing - there has to be milling. We have "'Vo cases: milling and
resurfacing; and milling and overbuild
31. There are very specific FDOT requirements QC at the plant and at the roadway for asphalt.
Is it going to be Miami-Dade County spec or FDOT spec because there is a significant
difference?
Quality control for asphalt will be as per Miami-Dade County standards.
32. Regarding sod, is there a restriction as far as limits to which the City is facing? For instance,
on North Bay Road we have to go between trees, how wide of an area, what are your limits
for restoration of the sod, by the park especially?
For landscape restoration after trench excavation, please refer to Sheet # 5, note # 17,
and Pavement Pestoration and Pipe Trench Detail on sheet # 37
33. The equipment outside of that trench in the tracks will be the contractor's responsibility?
Yes.
34. What does the City consider the difference between a small tree and large tree? There seems
to be a lot of large trees that need to be removed.
Large trees are considered those which caliper is 18" or larger measured 48" from the
ground. Small trees under 18".
Bid07 - 1 0-02Prc-BidConfercnccQ 1\ (2),doc
Page 4 of 7
!
.1
35. The quantities represent the trench itself, not the tracks for restorations?
Please refer to Sheet # 5, Note 17: "For construction of the sewer system contractor
shall saw cut pavement along the proposed utility trench. Cost for backfill with suitable
selected material and reposition of pavement, driveways or landscaped areas to its
original conditions and elevations shall be included in the unit price for sewer
construction. "
36. What about Royal Palm trees?
Please refer to answer to question # 34
37. The expanding road coming along the side is a concern as it is very expensive to remove
trees.
In some cases it may be better to move the pipe rather than the tree. As directed by the
Engineer.
38. Is there going to be variance on this project? You have an item 500 linear feet stakes/fence
buried in that item.
Staked silt fence will be used around well and trench construction areas as needed.
Floating silt barriers will be used during construction at existing outfalls to the bay.
39. Do you have an area set aside for a staging area?
Contractor must provide its own staging area.
40. Do you have an area set aside for a field office? 1 (
The City does not have an area set aside for field office.
41. What about clearing and grubbing, is it by the acre, 14 acres?
Clearing and Grubbing was deleted. However, pay items were added.
42. Will it be better to pay as a lump sum for the clearing and grubbing, it is going to be a
breaker item. What is the government standard for that?
Clearing and Grubbing was deleted. However, pay items were added.
43. If school is not done by January, will there be a conflict for closing road?
Use alternate access to the site. Contractor will address this issue on its work schedule.
44. Crossings, does the contractor get paid for limerock used?
Limerock will be paid when used as base material. Also, use lime rock for Item 102.3
Commercial Material for Driveway Repair.
45. Will the City be looking for trench backfill?
Trench backfill is indicated as a part of unit price for sewers.
46. On the backfill will the contractor be able to utilize material for trench backfill?
Trenches shall be backfilled with suitable material. Sheet # 39, indicate the type of
Bid07 -1 0-02Prc-BidCon fcrenecQ A(2),doe
Page 5 of 7
~-4~ j
~ jPvv
.
existing subsoil configuration.
47. The cost of rock has been changing quite a bit, any way to compensate for raise in price?
NO.
48. Limerock, measured compact and ready?
YES.
49. Will there be a line item considered for sidewalks where light poles are in the middle ofthe
sidewalk?
Box concrete around pole.
50. What is the intent for existing drainage lines?
As general information.
51. If contractor finds a drainage pipe and it is not in specs will it be left alone?
YES. Unless othenyise indicated by the engineer.
52. All existing pipes in specs to be removed or abandoned? If not specified should it be left
untouched?
YES, Unless othenvise indicated by the engineer.
53. Will contractor be cutting and gutting pipes in specs?
YES.
54. When will addendum be issued?
In approximately five (5) days along with copies of the sign-in sheets, and summary
minutes of today's meeting.
55. Any known utility conflicts?
NO, no known conflicts.
The Pre-Bid Conference was concluded at 11: 1 0 a.m.
List of Plans dated 11-7-07, revised as per Addendum No.1
. General Notes and Miscellaneous Details
. Summary of Quantities
. Plan and Profile North Bay Road
. Plan and Profile North Bay Road
. Plan and Profile North Bay Road
. Plan and Profile NE 175'" Terrace
. Plan and Profile NE 1711" Dr.
. Plan and Profile NE 1711// Dr.
. Plan and Profile Church Dr.
. Plan and Profile NE 171" Dr.
Sheet 5
Sheet 6
Sheet 11
Sheet 15
Sheet 16
Sheet 19
Sheet 24
Sheet 25
Sheet 26
Sheet 27
Bid07 -1 0-02Prc-BidConfcrcnccQ A(2),doc
Page 6 of 7
~
I
. Plan and Profile NE 18(/" Dr.
. Plan and Profile NE 18(/" Dr.
. Plan and Profile NE 181s1 Dr.
. Drainage Structures
. Drainage Structures
. Drainage Details
. Drainage Details
. Cross Sections North Bay Road
. Cross Sections North Bay Road
Sheet 30
Sheet 31
Sheet 32
Sheet 34
Sheet 35
Sheet 36
Sheet 37
Sheet 51
Sheet 52
List of Bid Forms revised per Addendum No.1
Revised Section 300, BID FORM, sheet 1, 2 and 3
Bid07 -1 0-02I're- I3idConferenceQ A(2),doc
Page 7 of 7
Question:
Answer:
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
ADDENDUM NO.2
Questions & Answers
"Under Special Provisions page 4 of 15 paragraph 13 (CSBE), it states a
2% CSBE subcontractor goal has been established for this project. In
regards to the CSBE requirement, are there any special forms that must be
submitted with the bid, ex Schedule to Intent Affidavit. If so, please
forward the form/forms."
Certified Small Business Enterprises (CSBE) is not a requirement, but it
is recommended and encourage from Prospect Bidders.
Question:
Answer:
"Has the City conducted tests to determine casing depth for the wells as
required by Water Management District for the well permit. If not I
assume the drilling company will be required to obtain the permit as
usual."
Permit from DERM was secured by the City. Contractor must pay and
obtain the permit with DERM (payment will be reimbursed by the City).
Question:
Answer:
"Sheet # 36 states the well must be able to accommodate 600 GPM. Well
performance is usually specified as GPM per foot of head or specific
capacity. Is this correct or was "per foot of head" left off?"
It must read "per foot of head"
Nov 27 07 05:55p
o D
(')
~
Cl>
n
"".
;T
c'
tr
o
x
::;;
III
""
o
3
c
OJ
c
Co>
o
UI
)>
'"
::l
Co
"rl
o
3
o
to
o
Co>
o
CII
UI
=
III
<
lD
f7
CD
4D
::l
l/l
l:
c-
3
:;
..
Cl.
::l
'<
o
~
"
...
n'
.;-
CQ
..
::l
<
<I)
0-
"
!'>
o
lD
o
~
co
<:>
:u
III
<
Vi'
Gl
Q,
o
.....
0;
~
Leonard C Wooten
o
=
CD
(>
,..
;T
iii
tT
o
x
jj;-l
llS=
lit <I)
o c:
::l ::l
III a.
C'<l>
.:cQ;
~cC
.a ::l
:.~
...
allC
Q.CI
_DO
. 0 ...
~li:
~ ~
-::I
Co!>>
ll) 0'
~.:c
o c:
=1';
ICO
o 3
&.3
.. ;::;:
o ;-
., 0.
r-.... g: fJ
I'" < 't:l
g~
tA~
g~
o ;;:;
::l _<'I
:;- ("'\" ..-
~ r---. Cii g
_ ::l_
~ '''-i i'6'
;::;:-u
=...
::l 0
Q~
...0.
3 lD
!a:f
:5'~
:Coli)
C..o
II> c:
~~
,,0.
~cg
~o
o 0-
<1l III
~o
::l ...
Ul o.~
C ::T<
g ---.. <I) -
o _""-.J II> ~
;a "' 0''''
il ,,~-..
~~ ~g
Q,- Q~
"V l"'\. ~-
:!..~ ~o
3 ~ <I> 0
... ~~
~ :g 5.
[ ~O'o
g ~
<I) ~ ~
il>1D
~~
~::
. 't:l '"
<It ...
o Q)
=~
~g
'" g~
~ ?""<
I
c t-J
~ ~
\
~
~
::;
-
:r
iiI
"
...
o
CD
g.
in
III
Ctl
ClI
':"
III
..
a:
<II
III
::I
a.
'<
o
c:
III
iil
-g
~
3
:i'
CD
-
o
o
~
2-
:r
CD
~
C
~
~
;::;:
=r
'<
o
c:
.,
o
~
::I
~
o
~
0-
...
o
CIl
!"
~'1j
3 ~
CII ro
"VUl
... 1-'-
5'0.
-ro
::!::l
~rt
o
!!:.o
ll> -..J
~
g
"0 III
:!of--'
30.
ClI
-gtrj
;-.
-'1:1
Zro
III ::l
~rt
III
f--'
f--'
N
-..J
o
ID
::l.
~
~
l!:.
;T
1Il
..
III
"t:I
Ci1
III
fll
a
!.
0-
::I
1lI
n
o
:a
!2.
:;J
1Il
0.
3'
:r
ur
0-
3
QI
jj1
0'
:T
Cll
C"
1Il
III
-
9-
3
'<
';<"
::l
o
~
iD
a.
<Q
Cll
-
...
l:
IZ>
III
::I
0.
II>
'"
o
c:
...
CI
~
(h
c
C'
n
o
%
...
AI
(>
...
o
...
-of
o
-
...
"0
<II
(:;
<II
~
iii
CD
!l!
:-.
(,
w
~
C/l
c:
'?fig
~;~
~ Ci ~
I;Y"' 5
.,
c:.;
n -of
o =r
::l lD
:::I l:
'" ::I
~ c-
O' ~
::I II>
~~
;T ~
i :r
Ql s-
O' :;J
o 0-
< <'l
~ 6'
o 't:l
::l (g
;r 3'
~ 3
S'
CII
-
!2.
'0
~
:r
a::l
~
o
...
,..
:5'
(')
CD
::l.
;;;
n
!!.
0-
::I
7862423419
i?
ro
~ :z
III
to 3
~ Cl>
0
-
'1J
9 ...
3'
~ CD
0
~ 0
a
...
I>>
n
p-. ...
0
g ...
~
::l 0
0 r:;;
.
~ ~l
nO'
:>0 ~::I
-z
~9
rn
r:; i; (')
~ Ill-C
~il::l.
- -
- -
~ -0 -
~::s~
tTOc
-.,0
~~:;J
i
IZI
g,
0
UJ
~ m
m
::t:< =E
0
~
"t1 0
... CT
3' III
.. ~
0
0 0
a 3
iil IZI
(') Q.
0 ~
...
-l "tl
0 ...
~ 3'
"t1 It
.. 0
... 0
(') ::l
Do it
;a
01 n
cc -
~ 0
...
on
~o""'O
Oa::L
-;3
Illn~
CL6'
....
p.1
S" -f
::r
.. ;
co 0'
..
'Q ~
.
iil 3
iD c
CD ~
:>
< I:r
'" '"
0' C'>
'Q 0
CD 3
=- 'Q
:;: Q
<II &
-
3' 0-
'<
CD ~
S- ..
r:r ~,
s: 3'
co
c ..
c- o
:; 0
-= ~
co
'0 ...
n
? ~
!! (1
C. 0
:i :!:
..
0 s: -I
Co!>
Dl C :I:
m Z
!!' =ten(/)
u
C'> -<0"
0
;a en~o
;;;
() 3:0::tJ
~ :boCs:
:; II
!'! Ims:
~ ~~C
c:r
CD Cb_th
~ ZZ....
;; rnilfm
CD
0.
~ Cb~m
. m)>O
n
0 Z,,"O
""
GO ~"'11
.. ~
5? m-:s:
"- :;uO
~ "'C)>-o
0
~ ;:!!<,-
,...
0 oo-tm
::l ",,0
:T rn -4
... ... ::r 0
"" .2.0 a "tJ m
.2. (b ::s l>> ;0 0
<II n ~ n 0
~ ....~....
llJ Z " (i)
a:: c; (I) ::0
0. 3 ... )>
CD CD
iil t:r 0 3:
3 (I) :J
c ...
~
5'
n
<:
Q.
CD
:T
..
0-
3
~
Nov 27 07 05:56p
-rHT 11:43
FrorD8O
.'
J . "'
l,- - --.- - ,
11 .. M~ - .~.-~;
;..~ ~,)t~;.i,. j
~1~F'ti~ [,' . .' - __:. '
~C--"-
JlFIIb CI.-. - .
~senr;oo
JWI~PIi6IF~
....-"'" .. -~
/dIIf4n
.......
~O*c:... ~-
.........a OJ -
c..-~
...... ... -.,..-'1 . ....AD:a.u
c "" CllItios_1'Jllli:I:1iwot
~"l . f
~~~
~,.~D-~ ~
'tl ,.......
~~
~.......... ...
QobIIoIAraD
,.,...
~. .1
~~
Eo , --.....
~1i><L "'Q~
ll. "'II'liPo. -) r "
.....&... ....--
~
--
~~fJ ,.. .
I:A ~l. .. ....~
---~~
~
~,.-T
~~
-~
Ii ., ...... .....1loosI
IIT~~
.......~~
llIlIk~ .......
.....-'...
I'bIb
~P'I~ ~..,....... 1'1 ~
f'DIpIIlr~
ftIbliC""'" 5f*'a
~
s.,11'*4' .1IlIIIioo
~rF _ ..
~""".l _ ~
........-
,....
T"&IcIt..I.MllII~a. -
.....U ~~
-.-
Leonard C Wooten
7862423419
pA
~."'8.__
u.siJttSS~
111 NVII1 $I SUeet. 191f1 fIoo'r
Miami, Rodda 33U8--1CJOO
T 305.375-3111 f 3DS-375-3160
. '
nJi;;u'aidatIc-yW
CERT. NO:
APPROVALOAlE{S):
SCP1fU'llON OA-rt::
333
()'tI12Im1- CS8E
'\2l31I2OO1
..1ao&Y 12. 2f11
t.scRdva:an
eeu.o 1N0USfRV.1ItC-
P.o. 8alC~
MJaD.. F1- 33117
t)eaI" *- 'VLAlif1:
~ Ocp4~ d ~ 1hAll1I....._.l185 QJI'__ Its ~ of }CIlT ~f3iOR aJd
16a4.....~ tJr Q:tIIik....."",- ... .... ~ bu5fnsIi$ lCllib...~
"lIis_~___~__...a~- eus;.- a........ICSlli!)
in Utaai OacJ-canvlntlwl1:lllB9arilS$ \iSIld tJeIOIIt'..
YC3Ul' 1irm" bBirdIIdBd in our I~d .;ealltv"' ba..-i:lJ!. - aJI Dis ~ 6~l is ... for
~(12) ........ ....19 as"'---' 11i& .....-.oo.."reqdre adJiImal rWBJlal
...,.*",oflid U' .....___1OIilI~IfI1&beIrG gQI~edbJ8 pdnB g,a,,-ra to meet.a gMl-
.....,... -..-w- ~tD pIIl....-!is B sad bUSInBSS in !be aJll~
pi'" ~ 871 far \001.... PIeIIIIIO~.....1I'3d8~.lA5 ftSIEd-b8UrsehcriyafElBS 1Iat
JCU"~~ eIlgJlie1DI:idCli' pd Jlj~in 1iUI.--- under y;Nf caned-~
1'1111I ~ caD" WIIlin ,.. \iUI..,."UirU ~ ~fi(;8JIm period (samh as OIII....aliP,
~.!ll!_ Dd ..~~..-.. ... IT ~~~o.lI!d.ic8I'UII.~..1M~IQ~
<< ..... b..A>.a GIIIIEIEIS -.1III&f) pi .... tdIr'" oIiCe in dIV Qla_ ,.... ~~ It is
b~(J/N)" _ ....tIWl ~ ....uodllal en,... QUI......- 811.... M ~ Of
.J_e-11lI*ItI till as ~~ .... IJB ..~ fD 1118 Ca~ Utit ~ Ie
JVlI'S ci am am. _ SOOp.IIL .........~ FfidS1t Thls ~ bl1lSft1ilill 11....-11 to JDU
8Il1lt'l - t fI\OR tJr .-....d.~ (8 UIJda sttar'IeI' ~I!"") ..aIIin four (4) weekS- d. &he ~
...--.aIian GiIB. ptesISB lIB.... .-4 hip-ton...... ....~ from 1lICI1in9 m QJI~.acts
d*!InI!d baIIJh its ~........ Jf)IIU 1BIf 10 re-oerIf1 or if1he InII JDE;eS Its Q;;ll1i1tt'8lUJO fa"
atr,/f'8B!iGl.
.... 1c:dC faIward lo'~ p3II~ in MiarI'i-I)iade CGR1JS smtI JWJIot ~
tuJl1'II!S'S ....alta.
!aip*
MIlI'ShI e......a,
[)ir&cIDr.. DBD
CA~{Ycu1iJm111illfIidor P-~ OOQJIb-tscdy~theS9~ieS)
.HI DblrspedlllT....Cu.j. ....11 (CSBE-.... 2)
Pl!IC\IItIQ MIl-- CcaIIIrtII.!a Qadl..-a ~-led 2)
~18I5n1a~{CS8E-.....2J
~.