RE: Professional Design Services for the Collins Avenue Streetscape
RFQ 07-07-03
Dear Ms. Hines and Selection Committee:
It is with great enthusiasm that we submit our qualifications to the City of Sunny Isles Beach for
Professional Design Services for the Collins Avenue Streetscape. Beiswenger, Hoch and Associates,
(BHA) provides civil and structural services for roadway and bridge projects and comprehensive
architectural building services. Our experience with projects of similar size and scope, combined with
our knowledge of the City and its codes and procedures makes us uniquely qualified to perform the
Engineering services required for the Collins Avenue Streetscape Project. Not only are we well aware
of the City of Sunny Isles' requirements but also as a leading consultant for FDOT District 6, we are
well aware of their requirements concerning State Roads. This knowledge will aid in MOT
. requirements, utility coordination and permitting as needed with FOOT.
Adding to our ability to successfully lead this project for the City is our teaming with Zyscovich, Inc. for
economic feasibility and landscape architecture. Zyscovich is distinguished by its record of success in
moving projects from planning to implementation based on sound and effectively communicated
resolution of stakeholder issues. Approaching the design of each project with economic feasibility as a
preliminary goal, Zyscovich creates plans that are consistently carried through to construction. This
experience is critical in recommending the Collins Avenue improvements for Sunny Isles Beach.
Completing our initial team is CPTE for Electrical Engineering and Streetscape Lighting Design and
Geosol for Geotechnical Engineering. Both of these firms have an excellent record of performing on
time and on schedule for an array of Municipal Projects in South Florida. Should additional specialty
consultants be required, we will work with the City of Sunny Isles Beach to bring highly-qualified,
professional firms onto the team.
All successful projects are a result of teamwork and good communication. We look forward to working
closely with the City in creating a viable holistic approach to ultimately achieve a product which will be
economically feasible, have community and business buy-in, and is aesthetically pleasing. Thank you
for your consideration.
Sincerely,
.
BEISW.E~GE~' HOC A~ AS;9CIA TES
R~d T ~t~
Bob Filusch,
Vice President
P.O. Bo>. 1368. North Miami Beach, Florida 33160
. 1190 NE 163rd Street, Suite 203, North Miami Beach. FlOrida 33162
City. of Sunny Isles Bead;
1mlI~
~[iI.IIIII~~
.
1JlII'1a.....'I.J.r:II~~.~I.:a..'[fgJ
Olm~~~:l:l..'{..~
~n:l..~mmJ
~~:I:~I:I~~~~
m. .~f:lll:li'r.~
[..]......a..[.m:.].~
~ .ffIml:J~I:lill:lI(.~
~lll(:ll~
'ib~~
~::=::::~~
~
a~~ffi~.l1mJ
~
~]8m~~f:ll[~
~~~
~.~~"'Tifi
. C!E~~:;_~1
~~ffi~m.J:Io1
~]Um · · . · ~1Il:;f1:1.'tIF.T'iT!J
ImM · · ...
n.. . .. _ rf!Jrdh:g
WI
Ci.~~~
~
~ l:ta;{~.m:l~~
Q~It;~~
lID:;.: .
1h.1iIml ~I:lill:ll(."~~
a~
~~~
(,b' ..: · .
!El~tm_ II
~-
Ih..~lm~
~
.
. .
~.
~~ ~~-~
1/ 'fi\
110:.--
IIlI
~lOOl~~_UI&
~rr:~~lm
~
B
.
.
.
~lI:'1H1I.]~1!e1}'] a]~
;J11rn_ ~~
c '"" ~
::
c
e
r;:
-c 'C"I.- ,.- 7~- U r~ '2f-
gi,''-I-B',\\f,\ c CJI<::4,,- P)
_L.:::::J,-'_.__' -..J.J j _ ,_,....:::;:::J --9
F f0rLJ L .'rr, {;I @' '~TF:iI ;\ =;rc-::~ 'I~~ (c
,,,,) :,-jU "JU'cLG ,,~~~)g .SiLw"',\U .s<?), JU J c.h
Beiswenger. Hoch & Jl.ssociates. Inc. (BHA) headquarters is located at 510 Shotgun Road. Suite 400.
Sunrise. FL 33326 and has a branch office at 1190 NE 163rd Street. Suite 203. North Miami Beach. FL
33162.
BHA was incorporated in 1955 in the State of Florida. BHA provides comprehensive architectural building
services and civil and structural services for roadway and bridge projects. The annual revenues for the
past two years are $7.442.511 (2006) and $8.983.091 (2005). The 2005 revenue is somewhat higher than
2006 revenue due to our being the Architect and General Contractor in the design and construction of
our headquarters office building in 2004-2005.
Persons having a financial interest in Beiswenger. Hoch & Associates include:
Francisco A. Norona. President
2255 Antilia Avenue
Davie. FL 33324
Gabriel F. Norona. Vice President
11900 NW 8th Street
Plantation. FL 33325
Maria G. Alvarino. Secretary
7774 NW 168th Terrace
Miami Lakes. FL 33016
ZYSCOVICH
I ARCHITECTURE I INTERIOR DESIGN I URBAN PLANNING I LANDSCAPE ARCHITECTURE I
Zyscovich. Inc.. is a Miami-based Florida Corporation. since 1977. Headquartered in the heart of
Downtown Miami with offices in West Palm Beach and New York. the Zyscovich team has garnered a
national reputation for its significant architectural design. urban design. interiors. landscape architecture
and historic preservation work.
Led by Managing Principal Bernard Zyscovich. our portfolio encompasses more than 30 years or
completed. award-winning projects with an emphasis on public/private redevelopment and a record of
implementation. Leading the landscape architecture sector. Carolyn Mitchell. RLA. possesses in-depth
knowledge and experience in the development of large-scale recreation. hospitality and urban design
projects. with a focus on environmental and cultural fit. Ms. Mitchell will be the Project Manager for the
design team.
The Zyscovich office that will provide professional services for this project is located at 100 N. Biscayne
Boulevard. 27th Floor. Miami. Florida. 33132
Zyscovich. Inc.. in our 30th year and with a staff of 130+ professionals, is rinancially stable. Our firm is
not currently. nor ever has been. involved in bankruptcy proceedings.
k
I ~~-
I: t-
- _~~5r':~
. J~~~1:t:";1(~l_
~
.
The following is The annual revenue for the past two years:
2006: <; 20M
2005: <; 15.5M
The persons having financial interest in the firm include:
Bernard Zyscovich. AlA
Coconut Grove. FL
Jose Murguido. AlA
Pinecrest. FL
Anabella Smith. I D
Coral Gables. FL
Suria Yaffar. Assoc. AlA
Coral Gables. FL
APT
ENffiO~~~RS
.
In March 2004. A&P established the Electrical Department with the acquisition of two Electrical
Professional Engineers. Mr. Eduardo Martinez. P.E. and Mr. Alex Guon. P.E. Mr. Martinez. as Department
Manager. has more than 25 years of experience in the field of Electrical Engineering.
In the past. A&P has demonstrated the ability to deal with general public. land owners and M-D WASD
staff. Our Team has demonstrated a strong emphasis on sustaining an excellent communication line with
our Clients. Our Project Manager. Eduardo Martinez. P.E. will maintain a close communication link with
the Hazen and Sawyer Project Manager. This process will begin at initial negotiations and will continue until
the final construction documents are prepared. We firmly believe in close coordination with the Project
Manager and will look for and receive advice from him on all significant matters. i\&P will coordinate with
other subconsultants in this project to assure total communication within the team.
~
Geosol's experience is in the field of geotechnical engineering including planning and performance of
field investigations. for numerous transportation related projects such as roadways. highways. railroads.
marine. underground. and airport facilities. The firm's experience also includes interpretation of subsurface
conditions. planning and execution of laboratory testing programs. geotechnical analysis and design of
foundation elements of structures. management of geotechnical projects and preparation of numerous
geotechnical reports providing conclusions and recommendations. The firm Geosol has executed and
served as project geotechnical manager for numerous FDOT projects for Districts 1.4.6.7 and Turnpike
as well as MDX.
.
.
.
.
!'_l.\'~n_ 'rt "<
_1im"]~[SI~i~:
State of Florida Professional Licenses
~ate ~! l'flllriba
."- ~'-> '''; .
J!l1oaro of lk1rofc55JmmL ~ltgtltCCr5
;' ~",B~~, -:-~_'~'
~:~~:./1:~_~-: ;1n/"';~
RObert''J;',Fildsch'=; PE
,:; /in",.,,,/ "., " . /).,.';:.,.;iN",/ ~~'~r'r A"~'H r ./7/. .71,.ri,'/', . y,I;.'/"H~.
Expiration: 28-FEB-09
AUDIT NO.: 0709. 001085
P.E. Number: 25129
DISPLAY AS REaUIRED BY LAW
~ate~!,~lllriba
I!.~oaro of Ni:b{f~~j~il!inwnl'1.'r5
'-';;...;}ik- -~<J Jl.- -"'f~,~,;::.. .o.r
Beiswen e 0 ,&'Asso.c.lates Inc.
.s
',""~
. Z "n..~A"'",,,:uv/h',ukr /,/,r/o.r",,;;,;,..,.,... "/:/;-";;-""".' :' '~4~/..""h.r';"'/', .'QI'}'/..,h..... /r ,.,#r "'V"""'/'l;"? ";";!'Y',;"...
/,- ~,;;e.~~;~':.....
/,. /,,?, /",/'/''r- /,,(rv,",'yh ..' . ~r~_;""N""/ r:"Y'/"Y~~~(/?~I;;;';'''''''/ u"uhr I'",,(''/'/'-'''- -/7 J. .7/,'n;'~' .'M,/"h-..
AUDIT NO.: 070.. ,
CERTIFICATE OF AUTHORIZATION NUMBER: 263
EXPIRATION: 28-FEB-09
DISPLAY AS REOUIRED BY LAW
State of Florida Professional Licenses
Ac;3096712
STATE OF FLORIDA
DEPARTMENT OF BUSI~~SS AND PROFESSIONAL REGULATION
BOARD OF LANDSCAPE ARCHITECTURE
SEO#L070226001H
.,'.. : . : . LICENSE NBR
102J26J20071~60530629 ILC26000298
Tbe LANDSCAPE ARCHITECT BUSINESS
Named below HAS REGISTERED
Under tbe provisions of Chapter 481 PS.
Expiration date: NOV 30, 2007
ZYSCOVICH mc
100 NORTH BISCAYNl!: BLVD
27TH PLooR
MIAMI FL 33132
'2~41825
STATE OF FLORIDA
DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION
BOARD OF LANDSCAPE ARCHITECTURE SEO#LO€l:0700Hl
'~'U .;~'U'"'l:I:',I, t:I:t'~LICElolSE NBR
11/07/20061067028357 ILA6666861
The LANDSCAPE ARCHITECT
Named below HAS REGISTERED
Under the provi.ions of Chapter 481 FS.
Expiration date: NOV 30, 2007
MITCHELL, CAROLYN
1615 SW 40TH AVENUE, APT 2
MIAMI FL 33]34
l... _
::
_ t(' of $10 '
g;:~~a
.--:~. -
llrplJrlmrnf ITt ~tUlr
I l~I1i1y lltA'Jr It", ...ccrd& 01 t",. r"'''~ u_ B[lSV/U',GLH o1QC,., to
"'~&lC.:'!~5. IHe ...." :;orp::....,=..., 'n.A...'''''.;).....de< !h(. lR...~ 0' ~ ::.1..10. 01
Jtl<1rlo11 fa.r1ur..lunl,2':i '955
Tno,documf<.............-r.o1'rtIt11l1olXlfPlll'M>CY1"'llfCl7(;
I lurthrr OI;>tf.I" tnnt:olWl ~"tlfl.U"tlh.... "1..,...dlO at lWt <I'''' '1-4 cm.("", 1Ilf!l<'gr
(oacarrJ>Il' 31 2OC; IIlallh~: 'o:.~'lI <N......" ,.,.m'hm+.>m 10=""'= 'u~,
.....~ l,lee LT. .Js.<\UtI'" ~ 21);:,7 oV(1ll" ~m:Uf. I~ ,,;:t.,.,
I 1..111111:" c.>.,tl'lll,~, ....,(, 'X"f'(II'''I~''' l\.u <101_" "'~ at OI'l,"O.J!lCJr,
G.~..r.I)f'VI." "'i .....tIIl..<l<l It",
,-~..,,,'S_ eltr",SIIll"'iYFk,n;)p
..tl/1l1iil'lfl!__[-lIPl",l'1l.lh:
-11........~'I"..clJ...".Joitl'~ ,",xn
-, /
~!r,~l~~r
(.k1 ~, !-;"'ll';'m~
~'rn'~'t,,,1 ....1><1,
_ t(' of ,ffio .
~~~~11
.~,
IIrp:al1all't'lll"f Pun,
I 0Ii0IM\ IIoom mil ,~ d hi. aao. 1'Wl rrscovICH. IfC ... ~
CI"O""itood_,Il.........""ItWo~<$FIl:rdo1.,~CI'o::.or:-X/ 1{OW;
Tr.r.~numu.'r;ltl'llJllOl'JIOl'lIlbOllI..W($Jli
I""'""'" ~.....~,.. poocI.ot__ CI.-.,,* .-c.1Il~
~3',2007.INIl.!TIO!II~_~~~
.uAa;odDf'~3,2Of:r." _asnn&.~
It.Jrttw.~thaI..,~''-nol~...~fI{)~
~U....,.'..,I....-.:l....".....
GIUt!>M Dtlhe Slat cI ~
illT...~,ltNoCapfli:lIh.I,..
fl'wlU..yof.lllnu.,., 2CXi7
- /
J.,Jl....-.-:--
~'Ul,-,. d,......,"lnr::
"'''''_r''''''h.h
k
__~n'ld1tMr~.~!'] -
~q:-.l.i.~_
.
State of Florida Professional Licenses
c-A'atc of ~lort''''-
~ . lI't
0-' ,
~111:tra llf ~Jrllfrs5iiiii..Lt t:ll~i1trrr5
A & P CDnsultiftQ TraofWportatMm;Enginoo" Corp
iWDfT NQ.: Q'''~
CERTIFICATE OF AUTHORlZATION NUMBER: 1797
EXPIRA liON. 28---FEB.(l\'t
ctate of Jlflori'-
C$ ~ tIa
1!:n:tro of llrofrssirn..;,ll_ tnginn-rs
_ ."/"',./,,-/'11,.".:;
Antpn~~ G. ~:; PE
... h"......,,/.y N /;.,.~_,._/ ,.-v~~,-~".I' ~""r-h~' ..",. #",..../....17""/"'/,...
EJqJ,(atlOfl ~&-FE&-C9 r t Nl,lmtle" .10345
~"
7. ....,.""'...4.o/~ """'--~'''_'.y 4-.F_-~':.-K(tz:.-;' "..-'''' f'T..,,,,,,,- ,. ,.,,/-___ __._....
.. '~'.,~- /"""-~.. ;-~~/_fII'_..).;J,-"__--,,_,,,. ,~... ~ "".......-' "~4".
oUIDITNO.- ",0.
~tatl' of~lori(),
~ IJI ,1
J!.111ari'\ l1fpnl(l'?5i~1~ t1t~i1U'l'rs
..- .1"I",.,./"vA..,/ A
C~~-M, Gil~";. PE
~~
,;, t;",,,.,..-/.... '" ",.,./-.....,.,....,;I'..,V';,.-~.H"',/,r',J"'r/......I-/ 7?,..._~ //"'/#/".
~tate of ~lori()
C-' a
1!lO:1rllllf lIrnfrssimjit tngilU'l'rS
. \..;'://A-J~...M_/ ~
Ett~_M.~". _PE
.~ /~...... '_~_''''''''//''''-''';''<'''''';;'''/'''.y./''.. .,;.-; .?7...........w".. .1'1'...1'...........
bpiratltil'1 26.FEB..o9
P[ No.unbef 43953
E:cm<1U:ID 2~.rEB-OQ
P E Numt)f!r S54:J1
AUOfTNO. ",,,.,.
AUOlTNC),; 111'..
State of Florida Professional Licenses
~zttc of J~lor Izt
~tzttc of dJflorio
~ zt
:mnarlll1f lirnfc5",il1l1;tl ~lu::lil1cl'r5
. Ilk,;l" //,'".,/
Oracio Riccobono, PE
.
1!.'baro of liJrofc5$imml 1::1:':\1 '-5
Geosol Inc.
',:n.~"-,,..I'N,,/r~, I'/-, I,N"'~';'-";'~ ~;, .-/.",,,,,,.... .,'7/'023_ .y%--.;--,;..,.;. . "/;/'''' ,,,~~~;.
-";',, .-;.-/;/" //,,,.,.,,.,1/;" ,-'/"~0~"",~,'4 ;-"_"'-:N""""'~" ,,:,-:-" ,'--;",....,',/~ ,,,__:,~ " '--I .::;;;:
,;,. ~.,""'''~,,/ ""_ " .--J~",~""./I""'N/ Y/";n/,,,... u/"/,,,,'-'/>:"",,',I,,,,- ~. -I . /?:....,n~' , 1/"1,..1"",,
",'JOIT NO.: ".,.,,~
~ERTI!=i(;tTE 'JF AUTHORIZA "'lUMBER
PIRA liON
Exrllralior._ 28-F:=S-OS
C E Number 48324
AUDIT NO.: 07,C"
Robert J. Filusch. Project Manager
Registered Professional Engineer in the State of Florida No. 25129
Registered Professional Engineer in the State of Ohio No. E041926
For the past 30 years Mr. Filusch has been working on FDOT. Miami-Dade County and City of Miami
roadway projects and is well aware of FDOT and Miami-Dade County and City of Sunny Isles Beach
requirements. He joined BHA in 1977 as a project engineer on the Florida Keys Bridge Replacement
Program. Prior to coming to BHA Mr. Filusch worked for six years on highway and bridge construction
inspection for major projects in Ohio. Kentucky and Indiana. Combining his construction inspection
experience with this design and drainage experience has aided the design team in cost estimating.
construction scheduling. maintenance of traffic plans development. special provision preparation and
constructability reviews.
.
k
.
.
.
c,h~"'t:-
'- ~
E~E CE
_. i
· ':f.iI.]~[ ~1a3:rP.?
As a project manager he has worked on numerous projects where iandscaping was a key issue. One of the more complex projects
was the landscaping plans and coordination for the $80 mil/ion design/build project for the 1-595 / US 1 entrance ramps to the Fort
Lauderdale International A.irports. Critical to the landscaping was not only relocating existing but placement of new landscaping.
As project manager Mr. Filusch was responsible for aI/ plans and coordination.
With his extensive experience Me Filush brings the required knowledge and ability to lead the engineering components of this
project for the City of Sunny Isles Beach.
Contact information: (Headquarters) Beiswenger. Hoch & Associates.lnc. (BHA). 510 Shotgun Road. Suite 400. Sunrise. FL 33326:
(Branch Office). 1190 NE 163rd Street. Suite 203. North Miami Beach. FL 33162. T: 954 334 2748 (Direct Line). F: 954 334 2800
Email:
URL:
bobf@bhaengineers.com
www.bhaengineers.com
Bernard Zyscovich. AlA
Bernard Zyscovich has 30 years of experience in architecture and urban planning. The work of the firm is distinguished by its re-
cord of success in moving projects from planning to implementation based on sound and effectively communicated resolution of
stakeholder issues. Zyscovich creates plans that are built because the firm approaches the design of each project with economic
feasibility as a primary goal. Bernard has extensive experience with developer-driven projects that include significant investment
in a high-quality public realm. This experience will be critical in making the cose for Collins Avenue improvements for Sunny Isles
Beach. Relevant Project experience thot emphasize the stakeholder consensus and economic viobility issues pertinent to the Collins
Avenue Streetscape:
FEC Cc,rridor Study Mi3mi. Florida
[,/idtown Miami Mast:=r Plan /0iami. Florid3
:2 MidtCJwn Miar)]i. Fbid3
Hellywood. )/wng Circle Urban Design. HollywoJd. Florida
HollYlvoc,d Federal Highl\'3Y Zoning. HollywoCJd. Flond3
[.1iami Beach CP.A Ma:<:=r Plen Miami Beach Florid3
,,j,nchJr~ho,O~. /1,1ianli Bea~h. Florida
,'/iami Be3ch Ccnvennon Center. [.l;i3mi B:=3ch. Flc.,-,d3
Carolyn Mitchell. RLA
Carolyn Mitchell is a registered londscape architect in the State of Florida with fifteen years of experience working with large-scale
urban design projects worldwide. She has held key positions on major streetscape projects in the United States and Asia. She has de-
veloped an in-depth understanding of complex development issues related to streetscape improvement projects and has extensive
experience with public involvement processes and consensus building. Relevont project exper'ience:
DOI\lntown f'./'i3mi Ma:-t:=r PI3n
rv1ianli Idedla and Ent2rtainn1ent Di~trict
Overtown Greenl"./ay (---113fT/i. Florida
lith Srreer Corridc,r Impruem:=nrs. [,1iami. Flond3
S!cirunk Bc-ulevard ImprCJvemenrc. Fut L3uderdale. Florld3
F/3gler Sued Improvem:=nrs. Miami. F/crida
Fort Bonifacio SU::::::tsc3pe and Open Sp3ce PI3n !\1a!1lh Phil'opines
k
_~~_~1[~:]m _~;.
~
..
;..I I J 1_ 1.1
I i I
. ...
.
.
Our understanding of the requirements of the Collins
Avenue Streetscape project focuses on two critical factors
needed for a successful implementation. Our approach will
use a range of strategies to build consensus around a design
concept that creates a signature image for Sunny Isles Beach
that addresses these significant project issues:
Buy-in from adjacent property owners and key
stakeholders (Economic Feasibility)
In order to ensure that the improvement project is accepted
by stakeholders it must address their needs and preferences.
The Zyscovich-Iead consensus building process applies a variety of strategies to ensure that stakeholder
issues are addressed and resolved and that adjacent property owners are convinced that by doing "their
part" of the streetscape program that they will benefit:
Public forums and focus group meetings to identify issues of concern to property owners. These
will focus on:
A. Economic Issues
B. Current and Futures Uses
C. Development Trends and Potential
D. Community Image and Values
I n some cases. individual meetings are necessary in order to ensure we have a solid understanding of the
perceptions and concerns of key stakeholders. These meetings allow us to answer questions in depth and
tailor design proposals and presentations.
Economic Analysis using case studies that demonstrates the positive impact of public space
improvements on:
A. Revenue for existing properties
B. Property values. absorption rates
C. Future development options
D. Environmental and Economic Sustainability
Case Studies of individual properties fronting Collins Avenue to demonstrate how public space
improvements:
A. Complement existing and potential future uses
B. Address access. visibility and signage. screening and value of individual site conditions
Feasibility of improvement options within the context of FDOT regulations and limited ROW
(Constructibility)
The success of the improvement proposals and their ultimate constructability will depend on two key
factors that will be addressed as part of the Consensus building process described above.
The potential of improvements on adjacent properties to enhance the character of the public
space and magnify the impact and effectiveness of streetscape improvements in this challenging
environment.
.
Our approach will include preparation of a design manual for street frontage that builds the identity of
Collins Avenue in Sunny Isles Beach as a unique urban destination. Our approach. called Real Urbanism.
examines the unique qualities of a place and enhances those qualities with strategic interventions. These
include the materials that will be used within the right of way but also includes signage. outdoor seating
areas. shade. plantings and pedestrian circulation on adjacent private property. This approach will allow
a phased approach to construction and ensure that any investment by private property owners fronting
Collins Avenue is contributing to the realization of the design vision for the project.
The acceptance by FDOT of design proposals. Complete familiarity with the requirements
of FDOT for improvements within the right of way will allow us to push the envelope in
feasible ways.
k
.
.
.
~rnll~-;
,St" .
:VENUtS}REETSCAPE
~ !!:tl~
~=q E I' ::
.
Reference Project Name/Address: City of Sunny Isles Beach. Florida
Reference Project Description: Central Island Drainage and Street Improvements
Scope of Services Provided: Value engineering of existing drainage design. evaluation of drainage alternative.
preliminary design final pavement rehabilitation and drainage design using deep wells and technical assistance
during bidding process.
Professional Fees: $ 203.680.00
Project Start Date: January 2004
Project Completion Date: August 2007
Construction Start Date: July 2007
Estimated Construction Completion Date: October 2008
Project Construction Cost: Estimated $ 4.5 million
Reference Company Name: City of Sunny Isles Beach. Rick Conner. T: 305-947-0606. F: 305-792-1564.
Email: rconner@sibf.net
.
Reference Project Name/Address: City of Sunny Isles Beach. Florida
Reference Project Description: Golden Shores drainage and street improvements
Scope of Services Provided: Survey. street widening and revised preliminary and final design and construction
inspection.
Professional Fees: $ 448.864.00
Project Start Date: November 2000
Project Completion Date: March 2003
Construction Start Date: March 2002
Construction Completion Date: January 15. 2003
Project Construction Cost: $ 3.449.896.56
Reference Company Name: City of Sunny Isles Beach. James Watts. T: 305-947-0606. F: 305-792-1564
Reference Project Name/Address: NE 12th Ave from NE 149th to NE 167th Streets. North Miami Beach.
FL. Miami-Dade County
Reference Project Description: Street widening. including pavement reconstruction. new drainage system
and signing and marking and three (3) signalized intersections.
Scope of Services Provided: Topographical survey. final geometric design of street widening and intersections.
Drainage system by exfiltration. Pavement signing and marking and signalization at NE 159th. NE 163rd and
NE 167th Streets.
Professional Fees: $ 55.651.20
Project Start Date: July 2003
Project Completion Date: May 2005
Construction Start Date: March 2006
Construction Completion Date: March 2007
Project Construction Cost: $ 3.2 Million (allocated)
Reference Company Name: Miami-Dade County Public Works Department. Lana Moorey. 305-375-
.
Reference Project Name/Address: State Road 816 (Oakland Park Boulevard)
Reference Project Description: Milling and Resurfacing from Powerline Road to Bayview Drive
Scope of Services Provided: Milling and resurfacing. signing. pavement marking. signal modification
Professional Fees: $ 1.003.50
Project Start Date: January 2004
Project Completion Date: June 2007
Construction Start Date: March 2008
Construction Completion Date: March 2009
Estimated Construction Cost: $ 6.900.000
Reference Company Name: FDOT District 4. Ronald Wallace. PE. 954-777-4641. E-mail: ronald.wallace(~)
dot.state.fl.us
Note: For more detailed project experience please see 330 Form in Section 7 or this Proposal.
t
k
E ~ E ::: E _1"'.:.':4:$.1lI~ '\~:
l!l~
.
Project Name: Miami DDA Masterplan Update
Reference: Miami Downtown Development Authority
Mr. Dana A. Nottingham. Executive Director
200 South Biscayne Boulevard. Suite 2929
Miami. FL 33131
Phone: 305.579.6675
Fax: 305.3712423
Project Name: Omni CRA Master Plan and Miami Media Entertainment District Streetscape
Reference: City of Miami Omni CRA
Frank Rollason. (former CRA Director)
49 NW 5th Street. Suite 100
Miami. FL 33128
Phone: 305.679.6800
Fax: 305.372.4646
Cell: 305.299.7300
Project Name: City of Hollywood CRA Master Plan
Reference: City of Hollywood
Mayor Mara Giulianti
Hollywood. FL 33022
Phone: 954.921.3321
Fax: 954.921.3497
.
Project Name: City of Coconut Creek Master Plan
Reference: City of Coconut Creek
Sheila Rose. Director of Developmental Services
4800 West Copans Road
Coconut Creek. FL 33063
Phone: 954.973.6756
Fax: 954.956.1424
Project Name: City of Cooper City Municipal Facility
Reference: City of Cooper City
Mr. Carl P. Miller. Public Works Director
9070 Southwest 51 Street
Cooper City. FL 33328
phone: 954.434.2300
Project Name: West Palm Beach Master Plan
Reference: City of West Palm Beach
Mr. Mathew Flis. City Urban Designer
200 2nd Street. 5th Floor
West Palm Beach. FL 33401
Phone: 561.822.1439
Fax: 561.659.8026
.
Note: For more detailed project experience please see 330 Form in Section 7 of this Proposal.
k
.
.
.
~1~."~:tl$.'nenlJ]},
.=!I~~
SW 62 Avenue New Street Lighting System
Krome Avenue New Street Lighting
MIC-Earlington Heights Corridor New 7S0 VDC Power Supply
Biscayne Boulevard Pump Station Mechanical and Electrical Design
SR-826/SR-836 Interchange Lighting & Utility Master Plan
Terminal of Containers. St. Croix. US Virgin Island
Miami International Airport. Quality Control Reviews
Areawide and Districtwide Geotechnical Consultant FDOT Districts 4 and 6. over from Monroe to
Osceola Counties
NE 2nd Avenue Improvements. From NE 20Th to NE 87th Streets. City of Miami. FL
SR-s/Byscayne Blvd. Improvements. From NE 14th to NE 38th Streets. City of Miami. FL
SR 836 Extension. From NW 107th to NW 137th Avenues. Miami-Dade County. FL
SR 826 and NW 36th Street Interchange. Miami-Dade County. FL
SR 826 and SW 8th Street Interchange. Miami-Dade County. FL
SW 88th Street/Kendall Drive On-Ramp to NB SR 874; Miami-Dade County. FL
NW 74th Street Interchange at the Homestead Extension of Florida's Turnpike (HEFT). Miami-Dade
County. FL
SR 836 Toll Plaza and Roadway Widening. From NW 87th to 107th Avenues. Miami-Dade County. FL
Note; For more detailed project experience please see 330 Form in Section 7 of this Proposal.
k
.
I.
.
~
~~.:! . '. ." . . .
__~@~I~.'i4
u ~
The following professionals are BHAs proposed personnel to be assigned to the City's various projects.
We have included their qualifications. experience and availability.
Joseph Rojas. MS. Senior Highway Engineer
Qualification: MSCE. University of Miami. 1986
Registration: Florida -I n process of Renewing
Experience: 22 years. 21 years with BHA (refer to form 330
Manuel Vega. MS. PE. Senior Drainage Engineer
Qualification: MSCE. (Hydraulics). University of Nebraska. 1977.
MSCE (Environmental). University of Michigan. 1983
Registration: Florida PE-40695: Michigan PE-32117
Experience: 32 years. 2 years with BHA (refer to form 330)
Felix Cebrecos. MS. Transportation Planner. Traffic Engineer
Qualification: MS Urban-Regional Planning. University of Ohio. 1987
MSCE Environmental. Wisconsin University. 1975
Post Graduate/Mass Transportation. Switzerland. 1978
Experience: 30 years. 18 years with BHA (refer to form 330)
Gustavo Garrido. MS. Cost Estimator
Qualification: MSCE (Structural Engineer) Universidad Catolica. Peru. 1992
Experience: 19 years. 3 years with BHA (refer to form 330)
Louis Belmonte. PE. PLS. Constructability Engineer
Qualification: BSCE. University of Pennsylvania.
Registration: Florida PE-38375: Pennsylvania PE-13761 E: Florida CGC-369224
Pennsylvania PLS-7078E
Experience: 35 years. 22 years with BHA (refer to form 330)
Raul B. Rodriguez. PE. PLS Land Surveyor and ROW Engineer
Qualification: BSCE University of Habana. 1954
Registration: Florida (in process of renewal)
Experience: 38 years with BHA (refer to form 330)
Capabilities
1. Manloading Capabilities: Because this project will be accomplished locally we are in an excellent position
regarding our firm's man loading capabilities. Our headquarters is the focal point for technical activities
within the B HA organization. Technical staff. in terms of number of personnel and specializations/
disciplines. can readily be assigned to this project from this office. With a highway/bridge design
technical staff of 30 persons at our headquarters. the Collins Ave Streetscape project will represent
only a small percentage of our man loading capabilities.
2. Manloading Availability: BHA is in an opportune position to address the Collins Ave Streetscape
project upon Notice-to-Proceed. Robert Filusch. P.E.. our proposed Project Manager. currently has
only one assignment which is the Julia Tuttle Causeway Resurfacing: his availability is 80 percent.
k
,..
~':4:$.1I~I!}iSl =
.~~'l'~1~:~~_
k
.
Our Highway Department will be completing the AirportjSR 112 Connector in September of 2007 and will
be immediately available to start a new assignment. Our Structural Department is working with Mr. Becerra
and will also be completely available in July of 2007. In addition. our Bird Road/SR 826 Interchange project
will be completed in November of 2007. BHA has 3 RRR projects. which are 90%. 80% and 30% complete.
Our staff needs a new assignment.
Zyscovich is one of the largest architectu,-al fi,-ms in South Florida with a staff of mo,-e than 130
professionals.We have the resources and expertise to expeditiously complete the work proposed by the
City of Sunny Isles Beach for this project. As p,-eviously mentioned, these individual a,-chitects and designers
have extensive experience in projects of similar size and scope and, therefo,-e their full participation in
this project is not only timely, but will be a tremendous asset to the overall p,-oject's success.
Current Projects
Availability of Staff
Carolyn Mitchell: 90%
Suria Yaffar: 50%
Bernard Zyscovich: 10%
AI~T
ENeU[liJ]IERS
Project Name Client Status
OMNI CRA Planning Omni Redevelopment District CRA 90 % Complete
DDA Master Plan Downtown Development Authority 70% Complete
Hollywood Beach CRA Hollywood Beach CRA 90% Complete
Master Plan
West Palm Beach Downtown City of West Palm Beach 90 % Complete
Zoning Regulations and
Design Standards
Atlantic Beach Master Plan Town of Atlantic Beach. South 90% Complete
Carolina
Hollywood Zoning Overlay Hollywood CRA 70% Complete
.
Projects Currently Under Design
Project Name Description Progress
SW 62 Avenue New Street Lighting System 90%
MIC-Earlington Heights Corridor New 750 VDC Power Supply 90%
Biscayne Boulevard Pump Station Mechanical and Electrical Design 90%
SR-826/SR-836 Interchange Lighting & Utility Master Plan 90%
Krome Avenue New Street Lighting 90%
APCTE's electrical engineering staff is available to start on this assignment immediately.
.
Geosol's geothechnical engineering staff is available to start on this assignment immediately.
~'t'J~I~~~~ r~
.
;--~
~MH
BHA. Zyscovich. Inc and the rest our consultants can easily be available to meet at the Sunny Isles Beach
Staff Offices. as well as the project site within 30 minutes. Our offices are centrally located and also
available for project meetings should the need arise.
The following is an organizational chart depicting our key personnel proposed for this project.
.
.
Oracio Riccobono. P.E.
Geotechnical Engineer
- .....
- I I I
E ~ ~ E
...J-. .: __
---
--
'-I
-=a:-1 ...-.... ~
~
~
;: -
~ - ...;c '"" "'1 ~
- - .. I
.....:l ... "'"
::
Bernard Zyscovich. AlA
Managing Principal
Suria Yaffar. Assoc. AlA. LEED" AP
Principal-in-Charge
Carolyn Mitchell. RLA
Director of Landscape Architecture
Robert J. Filusch. P.E.. Vice President
Project Manager
Joseph Rojas. P. E.
Senior Highway Engineer
,f..,~anuel Vega. P.E.
Senior Drainage/Environmental Engineer
~-
--
--
----~
...
~
:-
....
~ "":'--
.._~::<"
-'
Eduardo Martinez. P. E.
Head. Electrical Engineering
Alex Guon. P.E.
Electrical Project Manager
Eithel M. Sierra. PE.
Senior Roadway Project Manager
:;~.:-
t
".'
---
k
.
.
.
_1.]::t.1[ct~u.:r:r:r:u~ 3""!':!lY!:Jm'- E ~EP E :E ..JU
..J~L I
.-
..
. -. -...
-
...--
:-1
....-.. .-
'-',: ~ I ': I
......-
~
.. ..~.
~-
"" -
BHA is very familiar with the City of Sunny Isles Beach and its Construction and Development Codes.
I n the past few years we have provided the City with Professional Engineering services for the following
projects:
Central Island Drainage and Street Improvements
City of Sunny Isles Beach. FL
This drainage and street improvement project is part of the Comprehensive Plan to alleviate flooding
problems throughout the City of Sunny Isles Beach. BHA's approach to solve the flooding problems of
the Central Island neighborhood was to utilize Drainage wells.
This drainage and street improvement project is the first of its kind to utilize 22 Stormwater Drainage
Wells for flood control. The injection wells are modeled to equalize runoff injection to the water table.
Golden Shores Drainage and Street Improvements
City of Sunny Isles Beach. FL
The project encompassed four phases of development. BHA provided consulting engineering services
for all phases listed below:
. Phase I: Flood control study and evaluation of the existing
storm sewer system and pumping station. Completed on
January 2001.
. Phase II: Photogrammetric and planimetric mapping of this
80 acre site. pavement condition survey. plan production for
the reconstruction of the storm sewer system. street widening
and signalization. This phase also included the electro-
mechanical refurbishment of the pumping station and new
flood control staging. Storm sewer rehabilitation using epoxy
resins and polyester liner was utilized. The 9.100 linear feet
of storm sewer "cured in place piping" (CIPP) rehabilitation
process is considered the largest of its kind in the US and
was published on the July 2002 issue of the "Trenchless
Technology" magazine. Drainage problem in one section of
this neighborhood was accomplished by using four (4) Storm
Drainage Wells.
. Phase III: Technical assistance to the City of Sunny Isles
Beach for letting and bidding process for the implementation
of this 3.5 million construction cost project. Completed on
October 2001.
. Phase IV Consulting engineering services for the
construction supervision (CEI) for the construction of this
project. Completed on January 2003.
...
oJ
~\~
PREsENTED TO
BEISWENGER, HOCH
& ASSOCIATES, INC.
-c<.<' ':>):;--
IN APPREClAnON OF QUAUTY Won
PJ.OVIDED FOI THE DIAlNAGE
PaOJECT IN THE GoLDEN SHORES
AIfA As SpECmED IN THE
CAPITAL IMPIOVDaNT PLAN OF
THE CITY OF SUNNY ISLES BEACH.
l'Iaau.aT 1. 100)
v
WA'loa DAVID 5.uuoN
Via MAToa NOUU,.H S. EDa..c:ur
COMWllSlOHD. G~Y GooDWAN
COaonHlON'l:ll D.uofT laus...,..
~ L...", lCAurno.uc 'V
BH.A worled on the Golden Shores Drainage ar,d
Strt'€t Improvemt-nt~ project The City of Sunn'Y l~les
beach prE'sentE-d 8H.~ wirh an award in apprecii:::lon
for qualit)! of work (.";'\I\.'ard shown hEff:')
k
.
.
.
~11-1111:$.1I.]:$.1l.'Crn ~.l.
iJ~ ~~~{l!1I!IllIIII p E ~ ,. "
-F
i:;
-~- - ,
.. ~
...
I,~
-
:::
Beiswenger. Hoch & Associates. Inc. (BHA) recently completed three major projects. The following
projects were completed on time within budget and without any claims for engineer's errors or omissions.
These projects are as follows:
$22 million - SR 934 widening from four to six lanes including landscaping
$9.2 million - SR 25 widening from four to six lanes including landscaping
$3.5 million - SR 5 widening of additional lane over the Miami River to SE 4th Street
These projects are all State Roads as is Collins Avenue. Two of the projects required landscaping Allof
the projects required MOT on state highway. survey. utility coordination and signing and marking.
There are two other projects which show capability. One is the $80 million Design/Build project for the
US 1/ Fort Lauderdale Airport. After winning this project with PCl Civil Constructors.lnc.. BHA valued
engineered the design criteria package. The new design saved $1 million for the owner and shortened
the schedule by three months.
k
.
ARCHITECT - ENGINEER QUALIFICATIONS
PART 1- CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Cit of Sunn Isles Beach, Miami-Dade Count , FL
2. PUBLIC NOTICE DATE
Jul 2007
3. SOLICITATION OR PROJECT NUMBER
Collins Ave Streetsca e No. 07-07-03
B. ARCHITECT - ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Robert J. Filusch, P.E., Vice President
5. NAME OF FIRM
Beiswen er, Hoch & Associates, Inc.
6. TELEPHONE NUMBER
305-944-5151
305-948-6290
C. PROPOSED TEAM
8. E-MAIL ADDRESS
bobf@bhaengineers.com
7. FAX NUMBER
.
(Complete this section for the Jrime contractor and all kev subcontractors.)
(Check)
0;: '0;:
w w 20 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
:2 >2 Of-
'f- 00
0;: -'0;: tIl<(
0.. <( ::Jo;:
0.. Cflf-
Beiswenger, Hoch & Associates, Inc. 1190 NE 163rd Street Project Management,
X Suite 203 Roadway Design,
North Miami Beach, FL 33162 General Design Work
. CHECK IF BRANCH OFFICE & Survey
Zyscovich 100 N. Biscayne Blvd Landscape Architecture &
b. X 27th Floor
Miami, FL 33132 Public Involvement
o CHECK IF BRANCH OFFICE
X GEOSAL, Inc. 5795-A NW 1515t Street Geotechnical
c. Miami, Lakes, FL 33014
o CHECK IF BRANCH OFFICE
d.
o CHECK IF BRANCH OFFICE
e.
o CHECK IF BRANCH OFFICE
f.
o CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
. (Attached)
STANDARD FORM 330 (6/2004) PAGE 1
rA,UTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
.2. NAME
Robert J. Filusch, P.E.
Vice President
15. FIRM NAME AND LOCATION (City and State)
Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
PE/1977/Florida (Civil)
PE/1977/0hio Civil
Com Jete one Section E for each ke
13. ROLE IN THIS CONTRACT
erson.
A. TOTAL
14. YEARS EXPERIENCE
B. WITH CURRENT FIRM
Project Manager
33
30
19. RELEVANT PROJECTS
.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-5 I Brickell Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County, FL 8/2005 10/2006
a, (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Project Manager - This project in downtown Miami is the widening of SR-5 I Brickell Ave to add an additional lane over the Miami River.
The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close proximity of the
construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the ROW. MOT
was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,500,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 3/2003 2006
b. (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Project Manager - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the FEC
Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three span
steel I-girder bridges.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 25 I Okeechobee Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 2/2004 2006
C. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Project Manager - The 2 miles long project was divided into two projects. The first project from SR 826 to W. 12th Ave was a $12 million
widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The second project was from W. 12th Ave to
W. 19th St. This project included preparing 30% plans and the design criteria package for a design-build project. Project required
depressing roadway under existing railroad.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 869 I Sawgrass Expressway Broward County Civic Arena Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
City of Sunrise, FL, Broward County 5/1998 1999
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Project Manager - This fast track project completed in 21 months from design to construction, involved the addition of direct access ramps
tolfrom SR 869 to the Office Depot Arena. Design included widening and resurfacing of mainline SR 869, widening of SR 869 toll plaza and
improvements to Sunrise Blvd Interchange. In addition, a new urban street "Pat Salerno Drive" was designed from SR 869 to NW 136th
Ave.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NE 151 and NE 2nd Avenue from NE 5th Street to NE 11 Ih Street PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
City of Miami, FL 6/2005 2007
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Quality Control Manager - This project in the a heavily urbanized section of downtown Miami included pavement milling and resurfacing, re-
design of two intersections, drainage modifications, permitting, pavement marking and signing, signal modifications, utility coordination and
RR coordination.
STANDARD FORM 330 (6/2004) PAGE 2
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
2. NAME
Joseph Rojas, P.E.
Senior Highway Engineer
15. FIRM NAME AND LOCATION (City and State)
Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
BS/1983/Civil Engineering, University of Miami, FL
BS/19831 Architectural Engineering, University of Miami, FL
MS/1986/Civil En ineerin ,Universit of Miami, FL Florida - In rocess of Renewin
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
A. TOTAL
14. YEARS EXPERIENCE
B. WITH CURRENT FIRM
Senior Highway Engineer
22
21
19. RELEVANT PROJECTS
.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-S 1 Brickell Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami-Dade County, FL 8/200S 110/2006
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Senior Highway Engineer - This project in downtown Miami is the widening of SR-S 1 Brickell Ave to add an additional lane over the Miami
River. The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close
proximity of the construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the
ROW. MOT was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,SOO,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NE 15t and NE 2nd Avenue from NE Sth Street to NE 11 th Street PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
City of Miami, FL 6/200S I 2007
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Senior Highway Engineer - This project in the a heavily urbanized section of downtown Miami included pavement milling and resurfacing,
re-design of two intersections, drainage modifications, permitting, pavement marking and signing, signal modifications, utility coordination
and RR coordination.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 2S IOkeechobee Road PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 2/2004 I 2006
C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Senior Highway Engineer - The 2 miles long project was divided into two projects. The first project from SR 826 to W. 12th Ave was a $12
million widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The second project was from W. 12th
Ave to W. 19th St. This project included preparing 30% plans and the design criteria package for a design-build project. Project required
depressing roadway under existing railroad.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 3/2003 I 2006
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
. Check if project performed with current firm
Senior Highway Engineer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the
FEC Railroad were widened. Two new bridges over the Miami Canal and SR 2S were required. These bridges were 4S3 feet long, three
SDan steell-airder bridaes.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-9S/Palm Beach International Airport Interchange PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Palm Beach County, FL 1999 I 200S
e, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Senior Highway Engineer - This is a 3-level directional interchange that connects 1-9S with the Palm Beach International Airport. The
interchange has 14 bridges totaling 14,238 linear ft., of which 8 are concrete segmental erected by the balanced cantilever method and 6
are steel plate girder bridges. Construction Cost: $1 OSM. This project received 200S FICE Grand Award for Engineering Excellence.
STANDARD FORM 330 (6/2004) PAGE 2
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
12. NAME
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
erson.
Manuel Vega, P.E.
Senior Drainage Engineer
15. FIRM NAME AND LOCATION (City and State)
Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
BS/19?5/Civil Engineering, National University of Nicaragua
MS/1977/Hydraulic Engineering, University of Nebraska PE/1988/Florida
MS/1983/Environmental En ineerin ,Universi of Michi an PE/1986/Michi an
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
American Society of Highway Engineers
A. TOTAL
14. YEARS EXPERIENCE
B. WITH CURRENT FIRM
Senior Drainage/Environmental Engineer
32
2
19. RELEVANT PROJECTS
.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 816 (Oakland Park Boulevard) from Powerline Road to Bayview Drive PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Broward County, FL 2005 In Progress
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Lead Drainage Engineer - This project involves milling and resurfacing of the existing 6-lane divided roadway. Addressing safety concerns
and bringing other roadway and structure features up to current RRR guidelines and standards, The total length of the project is 3.0 miles.
Project included all phases of engineering, preliminary and final drainage design; coordination with government environmental agencies,
prepared documentation for permitting.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-80 (Southern Blvd) from West of SR-? to West of the Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Palm Beach County, FL 2003 In Progress
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Senior Drainage Engineer - Currently under construction, the 4 Km. project includes reconstruction and widening from 5 lanes undivided to
8 lanes divided, a grade separation at SR-? and a bridge over C-51 Canal. Drainage design included 4,500 If of French drains and 5
retention ponds.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 836 West to Florida's Turnpike, from NW 9?th Ave to the Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County, FL 2003 2005
C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Senior Drainage Engineer - This $39M Design/Build project required the design of 2,300 If of 24" exfiltration system, 80 drainage
structures, 5 detention ponds, and outfalls to the C-2 Snapper Creek Canal Extension, the SR-836/ SR-821 HEFT Interchange Lake
System and the Fontainebleau Canal. Analyzed the water management system, supervised the design and the preparation of the drainage
plans, prepared and submitted the environmental permits.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NW 12th Avenue Bridge Replacement PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Florida FOOT - District 6, Miami-Dade County, FL 2004
d.
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Senior Drainage Engineer - This drainage design included the Bridge Hydraulic Report for the 12th Avenue new bascule bridge over the
Miami River. The drainage design included detention pond and French drains to accommodate water quality and quantity requirements.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NW 12th Street from NW 13?th Avenue to NW 111th Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County Public Works, Miami, FL 1999-2000 (3 phases) 2001
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Senior Drainage Engineer - This design/build project consisted of the widening from 2 to 6 lanes to complement the roadway improvements
around the S250M Dolphin Mall which required the design of 6,900 If of 24" exfiltration system, 140 drainage structures, and outfalls to the
Imperial Lake, and the NW 12th Street! SR-821 HEFT Interchange lake system. Analyzed the water management system, supervised the
design and the preparation of the drainage plans, prepared and submitted the environmental permits
STANDARD FORM 330 (6/2004) PAGE 2
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
,2. NAME
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
erson.
Felix Cebrecos, M.S.
Traffic I Transportation Engineer
15. FIRM NAME AND LOCATION (City and State)
Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
BS/1971/Civil Engineer
MS/1975/Civil & Environmental Engineer, University of Wisconsin
MS/1987/Urban and Re ional Plannin , Ohio State Universi
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards. etc.)
Institute of Transportation Engineers International Road Federation
A. TOTAL
14. YEARS EXPERIENCE
B. WITH CURRENT FIRM
Transportation Planner / Traffic Engineer
31
18
19. RELEVANT PROJECTS
.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-5/ Brickell Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County, FL 8/2005 1 0/2006
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Transportation Engineer - This project in downtown Miami is the widening of SR-51 Brickell Ave to add an additional lane over the Miami
River. The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close
proximity of the construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the
ROW. MOT was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,500,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NE 1st and NE 2nd Avenue from NE 5th Street to NE 11th Street PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
City of Miami, FL 6/2005 2007
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Transportation Engineer - This project in the a heavily urbanized section of downtown Miami included pavement milling and resurfacing, re-
design of two intersections, drainage modifications, permitting, pavement marking and signing, signal modifications, utility coordination and
RR coordination.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 25 / Okeechobee Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 2/2004 2006
C. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Transportation Engineer - The 2 miles long project was divided into two projects. The first project from SR 826 to W. 12th Ave was a $12
million widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The second project was from W. 12th
Ave to W. 19th St. This project included preparing 30% plans and the design criteria package for a design-build project. Project required
depressing roadway under existing railroad.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 3/2003 2006
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
. Check if project performed with current firm
Transportation Engineer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the
FEC Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three
span steel I-girder bridges.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-95/Palm Beach International Airport Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Palm Beach County, FL 1999 2005
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Transportation Engineer - This is a 3-level directional interchange that connects 1-95 with the Palm Beach International Airport. The
interchange has 14 bridges totaling 14,238 linear ft., of which 8 are concrete segmental erected by the balanced cantilever method and 6
are steel plate girder bridges. Construction Cost: $1 05M. This project received 2005 FICE Grand Award for Engineering Excellence.
STANDARD FORM 330 (6/2004) PAGE 2
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
.2. NAME
Gustavo Garrido, P.E.
Senior Highway Engineer
15. FIRM NAME AND LOCATION (City and State)
Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
erson.
A. TOTAL
14. YEARS EXPERIENCE
B. WITH CURRENT FIRM
Cost Estimator
6
3
BS/1988/Civil Engineering, Peru Professional Engineer in the State of California; endorsement
MS/1992/Civil En ineerin ,Peru of PE License with the State of Florida in Process
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 816 (Oakland Park Boulevard) from Powerline Road to Bayview Drive PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Broward County, FL 2007 Iln Progress
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Highway Engineer - This project involves milling and resurfacing of the existing 6-lane divided roadway, Addressing safety concerns and
bringing other roadway and structure features up to current RRR guidelines and standards. The total length of the project is 3.0 miles.
Project included all phases of engineering, preliminary and final drainage design; coordination with government environmental agencies,
prepared documentation for permitting.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-80 (Southern Blvd) from West of SR-7 to West of the Turnpike PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Palm Beach County, FL 2007 Iln Progress
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Highway Engineer - Currently under construction, the 4 Km, project includes reconstruction and widening from 5 lanes undivided to 8 lanes
divided, a grade separation at SR-7 and a bridge over C-51 Canal. Drainage design included 4,500 If of French drains and 5 retention
ponds.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-5 1 Brickell Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami-Dade County, FL 8/2005 110/2006
C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Senior Highway Engineer - This project in downtown Miami is the widening of SR-5 1 Brickell Ave to add an additional lane over the Miami
River. The work included roadway design, drainage, signing & marking, signalization, lighting and bridge design. Due to the close
proximity of the construction of the Dupont Plaza Towers special MSE walls and pier footings were detailed in order not to encroach into the
ROW. MOT was critical to maintain traffic in downtown Miami. Estimated Construction Cost: $3,500,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 3/2003 I 2006
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Senior Highway Engineer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the
FEC Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three
span steel I-girder bridges.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NW 72nd Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami-Dade County, FL I
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
. Check if project performed with current firm
Widening and reconstruction of NW 72nd Avenue from a 2-lane to a 5-lane urban arterial.
STANDARD FORM 330 (6/2004) PAGE 2
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke erson.
2. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Louis Belmonte, P.E. A. TOTAL B. WITH CURRENT FIRM
Civil/Field Engineer Constructability Engineer 50+ 22
15. FIRM NAME AND LOCATION (City and State)
Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
PE/38375/FL (Civil Engineering), PE/13761-E/PA (Civil Engineering)
BS/ Civil En ineer, Tem Ie Universit , Philadel hia GC/359225/FL General Contractor, PLS/7078E/PA Surve in
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
ASHE, ASCE
19. RELEVANT PROJECTS
.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-826 (Palmetto Expressway) Interchange at Miller Drive, Bird Road & Don PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Shula Expwy, Miami-Dade County, FL 2004
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project pertormed with current firm
Constructability Reviewer - By improving the PD&E Concept, using 4,312 linear feet of steel box girders & steel plate girders, ROW costs
were avoided at all critical locations; the savings were over $15M. This was done by modifying the concept 3-level interchange to 2-levels
by creating a state-of-the-art bridge at SR-826 over Bird Road. The project is currently in the final design phase; estimated bridge
construction cost $56M.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 25 / Okeechobee Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 2004 2006
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project pertormed with current firm
Constructability Reviewer - The 2 miles long project was divided into two projects. The first project from SR 826 to W. 12th Ave was a $12
million widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The second project was from W. 12th
Ave to W, 19th St. This project included preparing 30% plans and the design criteria package for a design-build project. Project required
depressing roadway under existing railroad.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 934 (Hialeah Expressway) PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County 2003 2006
C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
. Check if project pertormed with current firm
Constructability Reviewer - This $20 million 2 miles long project was 4- lane to 6-lane widening. Two separate bridge crossings over the
FEC Railroad were widened. Two new bridges over the Miami Canal and SR 25 were required. These bridges were 453 feet long, three
soan steell-airder bridaes.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miami Intermodal Center (MIC) Master Plan PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County, FL 2002
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
. Check if project pertormed with current firm
Constructability Reviewer - This project required the modification of an existing interchange to provide direct access to the Miami
Intermodal Center (MIC) and the Miami International Airport (MIA), It also included the Preliminary Design for the Interconnector Roadway
between SR-836 and SR-112 alona the Lejeune Corridor, a critical comoonent of the Master Plan
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Fort Lauderdale-Hollywood International Airport Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Fort Lauderdale and Hollywood, FL, Broward County 2003 2003
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE . Check if project pertormed with current firm
Constructability Reviewer - This design/build project as a complete redesign of the access to the airport from US 1 and 1-595. From the
original concept BHA was able to provide a VECP, which reduced bridge structures by 25%, reduced the overall height of the interchange
by 17 ft., eliminated 14 degree curves from major movements, increased design speed on 4 of the traffic movements all while maintaining
the same level of services. Cost $82M.
STANDARD FORM 330 (6/2004) PAGE 2
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
2. NAME
Raul B. Rodriguez, P.E., P.L.S.\
Land Surveyor 1 Right-of-Way Engineer
15. FIRM NAME AND LOCATION (City and State)
Beiswen er, Hoch & Associates, Inc., 1190 NE 163rd Street, Suite 203, North Miami Beach, FL 33162
16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
BS/1954/Civil Engineering and Surveying PE/Florida (Civil)
Universit of Havana Havana, Cuba PLS/LS2717 Land Surve )
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Com Jete one Section E for each ke
13. ROLE IN THIS CONTRACT
erson.
A. TOTAL
14. YEARS EXPERIENCE
B. WITH CURRENT FIRM
Land Surveyor
50+
38
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-95/1-595 Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Broward County, FL
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
Chief Surveyor - Right-of-Way and Design surveys for this 4 level fully direction Interchange.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Stirling Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Broward County, FL
b.
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
. Chief Surveyor - Right-of-Way and Design surveys for this 2 mile widening from 2-lanes to 6-lanes.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-95/Davie Boulevard Interchange PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Broward County, FL
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
. Check if project performed with current firm
Chief Surveyor - Right-of-Way and Design surveys for this 2 level interchange on 1-95 and Davie Boulevard.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Miscellaneous Survey Miami-Dade County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE
. Check if project performed with current firm
Chief Surveyor - Right-of-Way and Design surveys for miscellaneous surveys in Miami-Dade County including roadways, sewer plants,
Miami Airport and Port of Miami.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 251 Okeechobee Road PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Hialeah, FL, Miami-Dade County
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE . Check if project performed with current firm
e.
Chief Surveyor - Right-of-Way and Design surveys for this 2 miles long project which was divided into two projects. The first project from
SR 826 to W. 12th Ave was a $12 million widening from 4-lanes to 6-lanes. The widening required a bulkhead along the Miami River. The
second project was from W, 12th Ave to W. 19th St. This project included preparing 30% plans and the design criteria package for a design-
build project. Project required depressing roadway under existing railroad.
STANDARD FORM 30 6/2004 PAGE 2
3
12. NAME
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com Jete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Bernard Zyscovich, AlA
Managing Principal
33
14. YEARS EXPERIENCE
b. WITH CURRENT FIRM
27
.. TOTAL
I S. FIRM NAME AND LOCATION (Ory and Stale)
Zyscovich, Inc., Miami, Fl
16. EDUCATION (DEGREE AND SPEClALlZA nON)
BA Architecture/Pratt 1971
Special Study in Urban Design/Universita' Di Architettura,
Venice Ital 1969
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
1977 /Florida/Architecture #7410
NCARB Certification #26130
18. OTHER PROFESSIONAL QUALlFICA TIONS (Publications. Organizations, Training. Awards, etc.)
Past President AlA Miami; Architect of the Year, AlA Miami 1999;
Honor Award for Excellence in Urban & Regional Design for Anchor Place, Miami Beach
19 RELEVANT PROJECTS
(I) TITLE AND LOCATION (Ory and State) (2) YEAR COMPLETED
MIAMI DDA DOWNTOWN MASTER PLAN UPDATE PROFESSIONAL SERVICES I CONSTRUCTION (if appl"able)
Miami. Florida 2006 Pending
a. (3) BRIEF DESCRIPTION (Brie( scope. size. cost etc.) AND SPECIFIC ROLE o Check if project performed with current fIrm
Strategic Redevelopment Plan Zoning Recommendations/Neighborhood Plans
Fee: $590 K
(I) TITLE AND LOCATION (Ory and Stale) (2) YEAR COMPLETED
HOll YWOOD BEACH CRA MASTER PLAN PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
Hollywood. Florida 2007 Pending
eb. (3) BRIEF DESCRIPTION (Brief scope. size. cost etc.) AND SPECIFIC ROLE o Check jf project performed with current firm
Redevelopment Plan and design highlighting Hollywood Beach's potential for a "green framework".
Cost: $275 K
(I) TITLE AND LOCATION (Oty and Stale) (2) YEAR COMPLETED
MIAMI MEDIA ENTERTAINMENT DISTRICT:14 TH STREET STREETS CAPE PROFESSIONAL SERVICES I CONSTRUCTION (if applicnble)
Miami. Florida Open Pendinq
(3) BRIEF DESCRIPTION (Bne( scope. size. cost ete) AND SPECIFIC ROLE tzJ Check if project performed with current firm
C. Streetscape and way finding plan which is part of the Omni CRA Master Plan Update and encompasses 270 acres.
Fee: $550 K
(I) TITLE AND LOCATION (Oly ond Slole) (2) YEAR COMPLETED
MIAMI BEACH CONVENTION CENTER DISTRICT PLAN UPDATE PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
Miami Beach. Florida 1992/2002 N/A
d. (3) BRIEF DESCRIPTION (B,ie( scope. size. cost ete) AND SPECIFIC ROLE o Check if project performed with current firm
Urban Design for the City of Miami Beach CRA Master Plan and Subsequent Update.
Fee: $230 K
(I) TITLE AND LOCATION (Ory and SlOte) (2) YEAR COMPLETED
HOll YWOOD YOUNG CIRCLE MASTER PLAN PROFESSIONAL SERVICES I CONSTRUCTION (if app'"able)
Hollywood. Florida 2003 N/A
e.
(3) BRIEF DESCRIPTION (B,ief scope. Size. cost ete) AND SPECIFIC ROLE rzI Check if project performed With current firm
Zoning Recommendations 1 Design Guidelines 1 Urban Design Recommendations.
Fee: $135 K
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
fComolete one Section E for each key oerson.)
13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
.2. NAME
a. TOTAL
Suria Yaffar, Assoc AlA LEED' AP
Principal-in-Charge
1S
I b. WITH CURREN: FIRM
I S. FIRM NAME AND LOCATION (Ory and Stare)
Zyscovich, Inc., Miami, FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
BA Architecture / University of Miami
MA Architecture / Princeton University
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
LEED' AP
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, ere.)
AlA competition awards for one residential and one school project.
Publications in ACSA Journal - 1998
19. R.ELEVANT PR.OJECTS
(I) TITLE AND LOCATION (Oty and Sta.e) (2) YEAR COMPLETED
MIAMI DDA DOWNTOWN MASTER PLAN UPDATE PROFESSIONAL SERVICES I CONSTRUCTION (if applKable)
Miami. Florida 2006 Pending
a. (31 BRIEf DESCRIPTION (Broef scope SIze. cost eK) AND SPECIFIC ROLE [ZI Check if project performed with current firm
Strategic Redevelopment Plan Zoning Recommendations/Neighborhood Plans
Fee: $590 K
(I) TITLE AND LOCATION (O.y and State) (2) YEAR COMPLETED
MIDTOWN MIAMI MASTER PLAN PROFESSIONAL SERVICES I CONSTRUCTION (if applKable)
Miami, Florida 2004 2005
eb. (3) BRIEF DESCRIPTION (Broef scape. SIze. cost ete) AND SPECIFIC ROLE ~ Check if project performed with current firm
Mixed-use, 56-acre urban infill development design for the City of Miami.
Cost: $275 K
(I) TITLE AND LOCATION (Ory and S.ate) (2) YEAR COMPLETED
MIAMI MEDIA ENTERTAINMENT DISTRICT:14TH STREET STREETSCAPE PROFESSIONAL SERVICES I CONSTRUCTION (If applicable'
Miami, Florida Open Pendino
c. (3) BRIEf DESCRIPTION (Broef scope. SIze. cost ele.' AND SPECIFIC ROLE o Check if prolect performed With current firm
Streetscape and way finding plan which is part of the Omni CRA Master Plan Update and encompasses 270 acres.
Fee: $550 K
(I) TITLE AND LOCATION (O.y and Sta.e) (2) YEAR COMPLETED
HOLL YWOOD BEACH CRA MASTER PLAN PROfESSIONAL SERVICES I CONSTRUCTION (if applicable)
Miami Beach. Florida 2007 Pending
d. (3) BRIEf DESCRIPTION (Broef scope. SIze. cost eK) AND SPECIFIC ROLE lEJ Check if project performed With current firm
Redevelopment Plan which highlights Hollywood Beach's potential for a "green framework".
Fee: $275 K
(I) TITLE AND LOCATION ,Oty and S.are) (2) YEAR COMPLETED
HOLL YWOOD YOUNG CIRCLE MASTER PLAN PROFESSIONAL SERVICES I CONSTRUCTION Irf applicable)
Hollywood. Florida 2003 N/A
e. (3) BRIEF DESCRIPTION rBroef scope size. cost etel AND SPECIFIC ROLE [8] Check if project performed with current firm
Zoning Recommendations / Design Guidelines / Urban Design Recommendations.
Fee: $135 K
12. NAME
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
a. TOTAL
14 YEARS EXPERIENCE
b. WITH CURRENT FIRM
Carolyn Mitchell, RLA
Project Manager
16
2
15. FIRM NAME AND LOCATION (Oty and Stote)
Zyscovich, Inc., Miami, FL
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
LA-6666861
18. OTHER PROFESSIONAL QUALIFICATIONS (PublicatIOns, Organizolions. Training Awards. eK)
Chair Miami Chapter US Green Buildings Council/American Planning Association Gold Coast Chapter First Places Master Planning Chapman
Field Park 2004 / American Institute of Architect, Miami Chapter / Award of Honor for Environmental Preservation
19. RELEVANT PROJECTS
.
(I) TITLE AND LOCATION (City and Stote) (2) YEAR COMPLETED
MIAMI DDA DOWNTOWN MASTER PLAN UPDATE PROFESSIONAL SERVICES I CONSTRUCTION (if npp)"ab/e)
Miami. Florida 2006 Pending
a.
(3) BRIEF DESCRIPTION (Brief scope. size, cost etc) AND SPECIFIC ROLE ~ Check if project performed with current fil-m
Strategic Redevelopment Plan Zoning Recommendations/Neighborhood Plans
Cost: $590 K
(I) TITLE AND LOCATION (Oty and Stote) (2) YEAR COMPLETED
MIAMI MEDIA ENTERTAINMENT DISTRICT:14TH STREET STREETSCAPE PROFESSIONAL SERVICES I CONSTRUCTION (if appl'cable)
Miami. Florida 2005 Pending
b. (3) BRIEF DESCRIPTION (Brief scope. SIZe, (Os! ete) AND SPECIFIC ROLE [8J Check if project performed with current firm
Streetscape and way finding plan which is part of the Omni CRA Master Plan Update and encompasses 270 acres
Cost: $550 K
(I) TITLE AND LOCATION (Oty and State) (2) YEAR COMPLETED
MIAMI BEACH CONVENTION CENTER MASTER PLAN PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
Miami Beach. Florida 1992/2002 N/A
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost el(.) AND SPECIFIC ROLE D Check if project performed with current hrm
Landscape Architect for the project.
Cost: $250 K
(I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SISTRUNK BOULEVARD STREETSCAPE AND URBAN DESIGN STANDARDS PROFESSIONAL SERVICES I CONSTRUCTION lif applicable)
Broward County. Florida 2002 N/A
d.
(3) BRIEF DESCRIPTION (Bnef scope. size. cost ete) AND SPECIFIC ROLE o Check if project performed With current firm
Landscape Architect for the streetscape portion of the project
(I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FLAGLER STREETSCAPE IMPROVEMENTS PROFESSIONAL SERVICES I CONSTRUCTION (if applicable)
Miami. Florida 2002 2006
e.
(3) BRIEF DESCRIPTION (Brief scope. size, cost etc.) AND SPECIFIC ROLE D Check If project performed with current firm
Landscape Architect for the streetscape design development and construction documentation
Cost: $10 M
.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
2. NAME
Oracio Riccobono, P.E.
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Geotechnical Engineer
erson.
A. TOTAL
20
14. YEARS EXPERIENCE
B. WITH CURRENT FIRM
7
15. FI RM NAME AND LOCATION (City and State)
GEOSOL, Inc.; 5795-A NW 15151 Street. Miami Lakes. FL 33014
16. EDUCATION (Degree and Specialization)
Civil Engineer (BSCE) and Master Degree (MSCE in Geotechnical
En inerin
18. OTHER PROFESSIONAL QUALI FICA TIONS (Publications, Organizations, Training, Awards, etc.)
American Society of Civil Engineers
Florida Engineering Society
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Registration No. 49324 (Florida, Civil Engineering)
19. RELEVANT PROJECTS
.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
to Osceola Counties 2003 - 2008 N/A
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm
Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of
geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design
nh~'A' PrniAd h~, ,nf $1 <; millinn'. Tn rl~tA WA h~vQ C"~~QCCf II I Q<; Twn onr hOVA ,nAnt $1-::\ millinn,
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
MIC-MIA Elevated People's Mover, Miami-Dade County, FL, FOOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2004 - 2006 ON-GOING
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm
Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering
report with foundation design and construction recommendations for the new viaduct bridge that will provide connection between the Miami Intermodal
Center IMIC) and the Miami International Airport (MIA). Geotechnical fees were $200,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Bridge Replacement for New Railroad Tracks Over the New River, Broward County, FL, TR/- PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
COUNTY COMMUTER RAIL 2001 - 2003 2004 - 2006
C. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm
Project Geotechnical Engineer responsible for planning the preliminary geotechnical exploration and laboratory testing programs, preparation of the preliminary geotechnical
engineering reports during preparation of Design-Build Documents for the new Viaduct bridge. Also, involved during construction reviewing and approving contractor's
submittals and performing verification type testing. Geotechnical fees during design were $500.000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 826 and NW 36th Stree~ Interchange, Miami-Dade County, FL, FOOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2001- 2003 2004 - 2006
d.
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm
Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs. preparation of geotechnical engineering report with
foundation design and construction recommendations for the new bridges and retaining walls. Geotechnical fees were $250,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 826 and Okeechobee Road, Miami-Dade County, FL, FOOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2001-2003 2004 - 2006
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0' Check if project performed with current firm
Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with
foundation design and construction recommendations for the new bridges and retaining walls. Geotechnical fees were $150,000
STANDARD FORM 330 (6/2004) PAGE 2
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20, EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
22. YEAR COMPLETED
Central Island Drainage and Street Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
City of Sunny Isles Beach, FL August 2007 October 2008
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Rick Conner 305-947-0606
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
.
Beiswenger, Hoch and Associates was invited to evaluate a previously design
stormwater drainage system. BHA evaluated that system and upon an environmental,
feasibility and cost evaluation, recommended for a new design using a series of
drainage wells interconnected for flow equalization. The system recommended by BHA
eliminated direct outfalls to the ecological sensitive Dumbfoundling Bay.
This drainage and street improvement project is part of the Comprehensive Plan to
alleviate flooding problems throughout the City of Sunny Isles Beach. BHA's approach
to solve the flooding problems of the Central Island neighborhood was to utilize
Drainage wells.
This drainage and street improvement project is the first of its kind to utilize 22
Storm water Drainage Wells for flood control. The injection wells are modeled to
equalize runoff injection to the water table.
Relevance shows work in City of Sunny Isles Beach.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) Firm Name
Beiswenger, Hoch & Associates, Inc.
(2) FIRM LOCATION (City and State)
North Miami Beach, FL
(3) ROLE
Value Engineering & Final Design
b.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
c.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
d.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
e.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
f.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST IllUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
2
22. YEAR COMPLETED
Golden Shores Drainage and Street Improvements
City of Sunny Isles Beach, FL
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
March 2003 January 2004
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Cit Of Sunn Isles Beach James Watts 305-947-0606
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
.
The City of Sunny Isles Beach was experiencing drainage problems with
the recently completed storm drainage pumping system built in the Golden
Shores neighborhood. The objective of this project was to identify and
quantify alternative methods to remedy the current problems: Drainage
evaluation, final design and technical construction assistance to the City
were included in this project: The project encompassed four phases of
development. BHA provided consulting engineering services for all phases
listed below:
Phase I: Flood control study and evaluation of the existing storm sewer
system and pumping
station. Completed on
January 2001.
Phase II: Photogrammetric and planimetric mapping of this 80 acre site, pavement condition
survey, plan production for the reconstruction of the storm sewer system, street widening and
signalization. This phase also included the electro-mechanical refurbishment of the pumping
station and new flood control staging. Storm sewer rehabilitation using epoxy resins and
polyester liner was utilized. The 9,100 linear feet of storm sewer "cured in place piping" (CIPP)
rehabilitation process is considered the largest of its kind in the US and was published on the
July 2002 issue of the ''Trench less Technology" magazine. Drainage problem in one section
of this neighborhood was accomplished by using four (4) Storm Drainage Wells.
Phase III: Technical assistance to the City of Sunny Isles Beach for letting and bidding
process for the implementation of this 3.5 million construction cost project. Completed on
October 2001.
Phase IV: Consulting engineering services for the construction supervision (CEI) for the
construction of this project. Completed on January 2003.
Relevance shows work in the City of Sunny Isles Beach.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
Beiswenger, Hoch & Associates, Inc. North Miami Beach, FL Survey, Preliminary & Final Design,
Construction Inspection
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
3
22. YEAR COMPLETED
NE 12th Ave from NE 1491h to NE 167th Streets
North Miami Beach, FL, Miami-Dade County
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
May 2005 March 2007
23. PROJECT OWNER'S INFORMATION
C. POINT OF CONTACT TELEPHONE NUMBER
305-375-2863
Engineering. Pavement reconstruction, drainage design, utility relocation, landscaping
restoration. Project includes: Final Design of 1.13 miles of street reconstruction; 4,200 If of
36" exfiltration system; 85 drainage structures; signing and marking and 3 signalized
intersections. Project involved coordination with city of North Miami Beach development
program, utility coordination. Also coordination with Florida Department of Transportation
(FOOT) for signalization and resurfacing work on NW 163rd Street.
Relevance shows municipal work.
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
Beiswenger, Hoch & Associates, Inc. North Miami, Beach, FL Street widening, including pavement
reconstruction, new drainage system and
signing and marking and three (3)
signalized intersections.
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and Stale) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
4
22. YEAR COMPLETED
NE 151 and NE 2nd Avenue from NE 5th Street to NE 11 th Street
City of Miami, FL
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
June 2005 2007
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade Count Leo Ona, PE 305-375-1909
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Relevance shows work in City of Miami with heavy traffic.
This project in the a heavily urbanized section of downtown Miami
included pavement milling and resurfacing, re-design of two
intersections, drainage modifications, permitting, pavement marking
and signing, signal modifications, utility coordination and RR
coordination. The picture shown below is taken before construction
and shows NE 1 sl Avenue looking north to NE 11 th Street.
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
Beiswenger, Hoch & Associates, Inc. North Miami Beach, FL PD& Study
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20, EXAMPLE PROJECT KEY NUMBER
5
21. TITLE AND LOCATION (City and State)
SR-5/ Brickell Avenue
Miami-Dade County, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
August 2005 October 2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FOOT - District 6 Luis Tellechea 305-470-5471
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
This project in downtown Miami is the widening of SR 5 / Brickell Avenue to add an additional lane over the Miami River. The work
included roadway design, drainage, signing and marking, signalization, lighting and bridge design.
A widening of the north approach span to accommodate an additional lane of traffic
with modified AASHTO Type VI beam designed by the LRFD Method. BHA
prepared the Bridge Development Report, 30% Plans and Final Plans, Also due to
the close proximity of the construction of the Dupont Plaza Towers special MSE
walls and pier footings were detailed in order not to encroach into the right-of-way.
Relevance shows work in City of Miami with close coordination with developer,
FOOT and City of Miami.
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
Beiswenger, Hoch & Associates, Inc. North Miami Beach, FL Roadway and Bridge Design
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
.
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
6
21. TITLE AND LOCATION (City and State)
SR-934/ Hialeah Expressway (FP #249985-1-52-01)
Miami-Dade County, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
March 2003 March 2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER C. POINT OF CONTACT TELEPHONE NUMBER
FOOT - District 6 Jason Chan ,P.E. 305-470-5331
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
This project consisted of widening 1.6 miles of the Hialeah Expressway from 4 to 6 lanes. The existing bridges over the FEC Railroad,
Okeechobee Road, NW 69th Avenue and the Miami Canal were also widened to 6 lanes. The existing bridges were inspected before the design
was started and the bridges were load rated using LRFR to assure they could handle the additional loading. One bridge was ASSHTO girders
and the other were steel girders.
Professional services included roadway, bridge and drainage design, bridge
inspection, bridge ratings, survey and signing and marking plans.
Construction Cost: $22 Million
Relevance shows our bridge experience for concrete and steel design, inspection of
existing bridges and our capability to do load ratings for bridges.
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) Firm Name
Beiswenger, Hoch & Associates, Inc.
(2) FIRM LOCATION (City and State)
North Miami Beach, FL
(3) ROLE
Roadway and Bridge Design
b.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
c.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
d.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
e.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
f.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20, EXAMPLE PROJECT KEY NUMBER
7
21. TITLE AND LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
February 2004 March 2006
23. PROJECT OWNER'S INFORMATION
SR-25 / Okeechobee Road (FP #25105-2-52-01)
Miami-Dade County, FL
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FOOT - District 6 Luis Tellechea 305-470-5471
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SR-25 was widened from 4 to 6 lanes. The existing roadway was milled and resurfaced. A continuous French drain system was required for the
drainage system due to strict environmental requirements. A 5,000 foot long bulkhead was designed along the Miami Canal to save over $12
million dollars in right-of-way cost. The bridge over the Miami Canal was widened.
.
Professional services included roadway, bridge and drainage design, design of a bulkhead
for the Miami Canal, MOT and surveying.
Construction Cost: $9.2 Million
Relevance shows roadway and special structure designs being the bulkhead along the
Miami Canal.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) Firm Name
Beiswenger, Hoch & Associates, Inc.
(2) FIRM LOCATION (City and State)
North Miami Beach, FL
(3) ROLE
Roadway and Bridge Design
b.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
c.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
d.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
e.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
f.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20, EXAMPLE PROJECT KEY NUMBER
8
21. TITLE AND LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
September 2003
SR-80 / Southern Boulevard (FP #229498-1-52-01)
Palm Beach County, FL
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FDOT - District 4 Ro er Lalanne, PE 945-777-4424
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
This project included widening from 4 to 8 lanes of 2.53 miles of road, 2 span steel I girder Bridge 585 feet long, 4,500 if of 36" exfiltration
system, 1780 drainage structures, 5 detention ponds, signing and marking, 4 signalized intersections and lighting.
.
BHA provided roadway, bridge and drainage design, signing and marking, and
surveying.
Construction Cost: $26 Million
Relevance shows BHA roadway and bridge design capabilities.
This project is currently under construction and BHA is providing post-design services.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) Firm Name
Beiswenger, Hoch & Associates, Inc.
(2) FIRM LOCATION (City and State)
North Miami Beach, FL
(3) ROLE
Roadway and Bridge Design
b.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
c.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
d.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
e.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
f.
(1) Firm Name
(2) FIRM LOCATION (City and State)
(3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20, EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
9
Fort Lauderdale-Hollywood International Airport Terminal Access, Q498085CF
Design-Build Project, Broward County, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
November 2003
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FOOT - District 4 James Scull, PE 954-777-4633
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
This is a two level fully directional interchange that provides access to and from the airport between US-1
and 1-595. The interchange has been reconstructed to address airport growth and expansion. Florida
DOT and Broward County chose the Design-Build contracting method that required an accelerated design
as well as fast-track construction. Controlling factors, established in the owner's criteria package, included
maintaining airport access and traffic on US-1, right-of-way limitations, bridge construction and
deconstruction over FEC Railway tracks, construction of six precast segmental (4,065 if and four concrete
conventional girder bridges, and deconstruction of four existing segmental bridges.
This project required complex interchange design, segmental bridge design, drainage permitting, wall
design, signing and marking, complex maintenance of traffic, deconstruction of segmental bridges,
surveying and geotechnical.
Cost: $80 Million (design/build)
.
Relevance shows our capabilities on large complex projects including roadway and bridge design and
complex maintenance of traffic. It also shows ability to work on design-build projects with tight schedules.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
Beiswenger, Hoch & Associates, Inc. North Miami Beach, FL Design/Build
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
.
STANDARD FORM 330 (6/2004) PAGE 3
20, EXAMPLE PROJECT KEY NUMBER
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
Blue Ridge Parkway, PRA-BLRI 20-15
Alleghany, Ashe and Wilkes Counties, North Carolina
10
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
23. PROJECT OWNER'S INFORMATION
June 2006
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FHWA, Eastern Federal Lands Highway
Division Brooke Struve, PE 703-404-6314
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
This project consists of milling and resurfacing and rehabilitating 13.3 miles of the Blue Ridge Parkway, overlooks, parking areas, developed
areas, spurs and access roads from MP 247.9 to MP 261.2. There are 3 parking and
overlook areas. The project included pavement removal, pavement patching, asphalt
paving, shoulder stabilization, stone curb removal and replacement, concrete curb
removal, drainage work, guardrail replacement, minor bridge repair and miscellaneous
work. Drainage work consists of inspection and evaluation culverts, inlets and ditches
fro the need for cleaning, reconditioning and replacement.
Professional services included roadway, bridge and drainage design, field surveys,
geotechnical investigations, traffic counts, safety report, Special Contract Requirements,
Engineer's Estimate, unit prove analysis, CPM construction schedule, design narrative
and highway design standard form.
. Estimated Construction Cost: $5.2 Million
Relevance shows BHA capabilities for working with Federal Agencies.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
Beiswenger, Hoch & Associates, Inc. North Miami Beach, FL
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
.
STANDARD FORM 330 (6/2004) PAGE 3
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
{Present as many projects as requested by the agency, or 10 projects, if not specified.
Com Jete one Section F for each ro 'ect.
20. EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
Miami Media Entertainment District: 14th Street Streetscape
Miami, FL
22 YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2006 Pending
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Miami
b. POINT OF CONTACT NAME
Frank K. Rollason
(Former CRA Director)
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost)
C. POINT OF CONTACT TELEPHONE NUMBER
Cell: 305.299.7300
The Media and Entertainment District Streetscape Plan has created a signature district identity in Downtown Miami. This streetscape and
wayfinding plan was prepared for the Community Redevelopment Agency as an accelerated element of the Omni Community
Redevelopment Agency Master Plan Update to support the opening of the district's center piece, the new Carnival Center for the
Performing Arts. Embraced by the Performing Arts Center and district business owners, the plan proposed a strategy to create a vibrant
public realm at street level that uses light as a wayfinding device and district identifier. The emphasis in the streetscape design is on the
establishment of a strong unifying rhythm created through the consistent use of repeated elements. This provides a powerful wayfinding
device that allows the streetscape to serve as a medium of connectivity throughout the district. The elements include paving material and
pattern. light fixtures and street trees. street furnishings and a wayfinding and identity system composed of Light Icons and Lightboxes -
vertical sculptural light fixtures and presentation apparatuses integrated with the streetscape that bring performances taking place inside
on to the street. Coordinated improvements by local businesses and the Carnival Center extend the design into the private realm.
creating a synergy between the Performing Arts Center and the surrounding neighborhood that reinforces its evolution into a vibrant.
identifiable walking district of media and entertainment uses.
Cost: $ 2 M
Size: 200 Acres
.
.....
(Jill
Wavfindinr; and dlSt(;,~ d"''1:;t.l f'lfOm~r.r_\
5tH'!'" fl:a'!,,'Iid< "nc' .o':"'m",rw
Fuildinc .lichring
.
STANDARD FORM 330
(1/2004) PAGE 1
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
2
21. TITLE AND LOCATION (City and State)
Flagler Streetscape Improvements
Miami, FL
22. YEAR COMPLETED
P'10FESSIONAL SE'1VICES CONSTRUCTION (if ,pplic,ble)
2002
2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Miami/Downtown Development Authority
b. POINT OF CONTACT NAME
Adam Lukin, DDA Miami
c POINT OF CONT ACT TELEPHONE NUMBER
305.579.6675
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost)
This project represents the relevant experience of Landscape Architect Carolyn Mitchell while with a previous firm, Wallace.
Roberts and Todd. Ms. Mitchell served as Landscape Architect for the streetscape design development and construction
documentation_
Flagler Street is one of Miami's oldest streets. Renovation plans for the street focused on making the most of a challenging set of
conditions including requirements for maintenance of traffic and maintenance of business, limited budget and utilities conflicts. The $10M
plan allowed the City to extend its scope of work beyond decorative improvements at intersections, as indicated in its adopted master
plan, to include resurfacing sidewalks on the Central Business District's main street, which had fallen into dangerous condition.
replacement of roadway lighting with pedestrian lighting, replacement of unhealthy and hazardous trees with large drought tolerant trees
and identification of utility upgrade and drainage issues requiring attention. Detailed field verification and work with engineers was
required to ensure constructability. The project was completed in 2006. Additional recommendations for enhancing the street through
Street Frontage improvements are part of the Downtown Master Plan currently underway for the Downtown Development Authority by
Zyscovich.
Cost: $ 10M
Size: 6 Blocks
1{_~JI'"~"~"V~U ·
tt~::~ . L
- < '-~-- -~~-
~ ~'f]'--:f~:~ ,~.
-:
,
..--
':~i~"\ 11----
::k.~"'~
. ~~-----_l~~~~c-
,-
.~r-'.
j
~
-i
l,.T'~-
I~'"" :.... L.
'f~.'- :~:~"~ ~-
I ........ .... I r
~
;o..~,~
.. ,..n, \
I' ,
_. ' I:J
, ~ j.' "-:~";l>" j
. :.~ . . .-'-
.' . .^' - 1'=
I
, ,II.
::::;!-..r
i
1..1
cd__
.H111
~
)t~{:=:ccc~,~~~~=~~:~~:;'-!~!
I.
I
STANDARD FORM 330 (lJ2004) PAGE 1
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
3
21. TITLE AND LOCATION (City and State)
Sistrunk Boulevard Streetscape and Urban Design Standards
Fort Lauderdale, FL
22, YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (;f applicable)
2002 NA
23. PROJECT OWNER'S INFORMATION
a PROJECT OWNER
City of Fort Lauderdale
b, POINT OF CONT ACT NAME
Mina Samadi
c, POINT OF CONTACT TELEPHONE NUMBER
N/A
24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
This project represents the relevant experience of Landscape Architect Carolyn Mitchell while with a previous firm, Wallace,
Roberts and Todd. Ms. Mitchell served as Landscape Architect for the streetscape portion of the project.
Streetscape design concepts complemented the urban design standards prepared for the Community Redevelopment Agency as part of
this corridor revitalization scheme. This project included an intensive public involvement process in which the design of a pedestrian
friendly street reflective of the neighborhood's community was a key element. The design concepts presented made creative proposals
for a "kit of parts" strategy for extending improvements into the private realm to enhance the streetscape concept. The strategy
identified appropriate materials, colors and patterns with enough flexibility to permit individual properties to implement project-specific
adaptations of the design that met the design requirements for each property in a manner that enhances the public improvements. The
design development of the concept involved detailed field verification and work with engineers to ensure constructability. Preparation of
construction documents was completed in 2005 and the project is currently moving forward with the approved palette of design materials
adapted to changes in jurisdiction and traffic engineering requirements.
Size: 20 Blocks
"- - -L]IJD' T"'" " -'-"
_......:.. ~' ~-- i_ C 1_,~ -- - i- L ......:
~, .. 'l ~., '1 f' f 'm
Ir~,,,~prll:
~~~:;t-'l,~~
I - - u I 1'1,. I
"-";;<'" I ,',- J ':',;-,
:h i ~ :;:Q '~'C .-",,::: --- mj~o: :7~ ~~
5<<....11<"..'/.'"
11<'....'50_\.0<'100
~..::~::,'~.':...~.:::---
~-
. ;tlj4J~~~-
~......,l..,",' ,rill L. .
_~_.:Ll.:L,l'~ij4:;: =::':L4 -
'rhm, - ,"'t"'~""Pl-rl""'T1' ,
~. -.
STANDARD FORM 330 (1/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each oroiect.)
20. EXAMPLE PROJECT KEY NUMBER
.
4
21. TITLE AND LOCATION (City and Statel
Florida East Coast Corridor Strategic Redevelopment Plan
Miami, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if appltcable)
2002
NjA
23. PROJECT OWNER'S INFORMATION
a PROJECT OWNER I b. POINT OF CONT ACT NAME c. POINT OF CONT ACT TELEPHONE NUMBER
City of Miami Jason Walker 305.250.5333
24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost)
This urban study. done in association with the Florida International University Metropolitan Center, encompasses the Florida East Coast
Railroad corridor. including the Buena Vista Rail Yard. Little Haiti, and the physically and financially depressed Omni community. The
study's purpose was to gain an understanding of each neighborhood's history. current economic and cultural status. and recommend
neighborhood improvements. The Strategic Redevelopment Plan identified redevelopment and infill development opportunities linked
by public open space and a trolley system.
Fee: $ 56K
Size: l.4k Acres
.
LITTLE HAITI PARK
..1,
...
:::_-~ ~ ~.
'''-~l..; ____-,..-:
\ r-~-'--_.....J
J ! .
:, ~
l j
-.... .
t"'"" l
t_-1 ~.~"U
~. t 1.: ~;-~_. '''':--'
J '-'-... ·
3I>.'?'" _ J.J.'.;t ..
.., r
. .
E .
2l
'Pc'" \ .>l
~ __ J.
1 i Vl
"'~.. ) i f
" '-.~ ~ .... :1
R.1 I
*
*
"so.::-
6\M111\"s,.
.-.
()cl<,c.l
...
f'-
. - -- I
:::: '-'.-, . ...
= \. =~
, :{
:: 1 ~~ ,"; .1 .-_
~ti
L,
[
Ulh~l_
MIDTOWN
;... ,..,
:',
: ,""'
Ls:..:.~:~
.
STANDARD FORM 330 (1/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
.
5
21. TITLE AND LOCATION (City and State)
Midtown Miami Master Plan
Miami, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2004 2005
23. PROJECT OWNER'S INFORMATION
a PROJECT OWNER
Biscayne Development Partners, LLC.
b. POINT OF CONTACT NAME c. POINT OF CONT ACT TELEPHONE NUMBER
Michael Samuel, Local Managing Partner 305.757.0001
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost)
The Midtown Miami development is likely to be one of the largest urban infill development projects in the country. The 56-acre
site, used by the Port of Miami as a staging facility for truck containers, was identified by Zyscovich as a potential mixed-use
district.
As the site's master planners and master architects, the team then partnered with the City of Miami's planning department to examine the
zoning and land use and to change the land use from Industrial to Restricted Commercial. Zyscovich then created Special District
Zoning and Design Guidelines.
From that point, the neighborhoods within Midtown were further refined:
. The western edge is the retail core with regional and local shopping.
. The northeast portion is an intense commercial zone with neighborhood retail.
. The "Entertainment Block" will provide continuous pedestrian activity.
Fee: $ 275 K
Size: 56 Acres
.
.
STANDARD FORM 330 (1/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
ComDlete one Section F for each Droiect.J
20. EXAMPLE PROJECT KEY NUMBER
6
.
21. TITLE AND LOCATION (City and State)
Miami DDA Downtown Master Plan Update
Miami, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2006 NjA
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Miami DDA
b. POINT OF CONTACT NAME
Dana Nottingham
c. POINT OF CONTACT TELEPHONE NUMBER
305.579.6675
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost)
The firm developed a master plan update for a 250 city-block area of downtown Miami. The project included programming. master
planning. design guidelines, zoning guidelines and landscape concepts. The project area included well-known landmarks such as the
Freedom Tower and Bayfront Park, as well as the central downtown commercial district. A key component of the updated master plan
involved the incorporation of the Bayfront Park into the broader downtown development plans and repositioning of the park as an anchor
destination to connect the various subdistricts within the area. The new park design provides opportunities for both large and small scale
public events as well as intimate "parks within the park" experiences for visitors.
Bayfront Park j Riverside Park
Fee: $ 590K
Size: 250+ City Blocks
.
,./
.
STANDARD FORM 330 (1/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
{Present as many projects as requested by the agency, or 10 projects, if not specified.
Com tete one Section F for each ro 'ect.
20. EXAMPLE PROJECT KEY NUMBER
7
21. TITLE AND LOCATION (City and State)
Hollywood Young Circle Master Plan
HolI ood, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
2003 N/A
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Hollywood
b. POINT OF CONT ACT NAME
Cameron Benson
c POINT OF CONTACT TELEPHONE NUMBER
954.921.3316
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost)
Zyscovich, Inc. created an urban vision and design plan for the City of Hollywood's Young Circle. Its purpose is to assist the City in
managing new development proposals which include such joint public/private initiatives as: an Arts Park. a Northeast Development
Parcel. a Northwest Development Parcel. the Great Southern and Adjacent Parcel. a Southeast Development Parcel. a PublixfWalgreens
site. an FDOT Street Plan. a TOD opportunity at the intersection of Hollywood Blvd.. and the FEC tracks.
The master plan capitalizes on Arts and Cultural Resources (both existing and planned) as a means of developing an art-centered base of
activities. It provides for a visual connection between Young Circle and the Hollywood Golf Course along with a public network of green
corridors and parks. The planned Arts Park will encourage restaurant, retail. and pedestrian activity on both sides of the circle and
synthesize the energies between the retail area across the street and those within the Circle. Parking is to be reconfigured and sited away
from the Circle, separating traffic. The Zyscovich plan further calls for the geometric reintegration of the Circle through the use of
circular architecture as in the piazzas of numerous Italian cities. It includes provisions for preserving development rights of nearby
properties while elevating the character and quality of development on the Circle.
FEE: $ 13sK
SIZE: 15 Acres
.
.
STANDARD FORM 330
(1/2004) PAGE 1
20. EXAMPLE PROJECT KEY NUMBER
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
8
21. TITLE AND LOCATION (City and State)
Hollywood Beach CRA Master Plan
Hollywood, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2007
CONSTRUCTION (iI applicable)
Pending
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Hollywood Beach CRA
b. POINT OF CaNT ACT NAME
Gil Martinez
c POINT OF CONT ACT TELEPHONE NUMBER
954.924.2980
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost)
Zyscovich is in the process of completing a new Vision and Master Plan for the Hollywood Beach CRA by focusing on strategies to
preserve its funky character. upgrading the quality of the public realm, and supporting new development which is compatible with the
existing building fabric. To support the Hollywood Beach CRA's implementation efforts for many of the capital improvement projects
identified in the 1997 CRA Plan. the zoning code and land use needed to be revised. Zyscovich reviewed the existing code in
comparison to the realities of the development climate, the limitations of the parcels and flood zone requirements.
The design team recommended preserving the character of the building scale in the portion of Hollywood Beach along the historic
broadwalkma 30 foot wide asphalt walkway unique to the South Florida coastline which is the iconic symbol of Hollywood Beach.
Although very little of the building stock was considered to have any historic value, the scale of the buildings along the broadwalk was
enough to merit a special district. This designation will allow buildings to exceed the 50% cap on building improvements without having
to meet the new FEMA and Florida Building Code requirements which limit ground floor uses to parking and storage. Additional
development is permitted one block east of the Broadwalk which is not part of the historic district.
.
This analysis was conducted for each neighborhood in the Hollywood Beach CRA and assessed connections to adjacent
neighborhoods. the Downtown CRA Dania Beach, and Hallandale Beach.
Cost: $ 275K
Size: 82 Acres
.Vr- ::~\~~'~'-~~~-:-=-iJ=-'-~~~-.~~~-=-~~~---: - :--~~-~---~ _'-c:c:'--:-~..~.. l_ l'::.
rr:~--. ~~'-. ..~"'"-.. ~. ::"'~L j_
It,'~ I ;....11.
It! ' ,~ I ~1h' ,] : II/'I ~
: r:, I ~ _. l__ I :i \
U~;..... -.r:-- , r~ - I :I 'IN. 1,
ll~ -- n__'<c-_ ---.-y-''.-'<-c----4~~-:.=!J J
'~ '~---\~~~"i:.:;J:- ~~. ,J" ,r~~'JJ ~
l' t. ~
A
.
STANDARD FORM 330 (1/2004) PAGE 3
.21.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Comolete one Section F for each oroiect.)
20. EXAMPLE PROJECT KEY NUMBER
9
TITLE AND LOCATION (City and State)
Miami Beach Convention Center District Master Plan
Miami Beach, FL
22 YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
1992/2002 N/A
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Miami Beach
b. POINT OF CONTACT NAME
Kent Bonde
C. POINT OF CONT ACT TELEPHONE NUMBER
305.673.7010
24 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost)
Zyscovich was commissioned as the Urban Designer to work with Wallace Roberts and Todd to create Miami Beach's Community
Redevelopment Plan for the Historic Convention Village and to write the Architectural Design Guidelines. The CRA boundaries
included Lincoln Road. the Convention Center and Collins and Washington Avenues between Dade Boulevard and 14th Street. The
study was completed on time and within budget and took one year to complete.
The subsequent Master Plan identified uses for two central blocks and to address the needs of the New World Symphony. This study
evolved into a master planning initiative which would transform the District into a global destination. The master plan proposes to create a
21st Century Town Center/Park and also includes the planning for a 65ft. high state-of-the-art Broadcast Space for the Future New
World Symphony. and future expansion to City Hall and the Convention Center. This Bryant Park-like civic space will serve as a nexus in.
around. and from which public. cultural. recreational. commercial. government, touristic, local. and leisurely activity will radiate.
The public Park in the central part of Miami Beach is a response to the City's character and enhances the community's quality of life. The
pervasive 'civic map to the future' which resulted from that vision serves as a highly detailed ten-year master plan of the entire Convention
Center District of Miami Beach.
Cost: $ 20K
. Size: Est. 15 Square City Blocks
t::'h~
P:.,~-"'''''
*1r~(7
tl-r~;-/
'" ~ "l:..~.
.
STANDARD FORM 330
(1/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each oroiect.)
20. EXAMPLE PROJECT KEY NUMBER
.
10
21 TITLE AND LOCATION (City and State)
Lincoln Cinema
Miami Beach. FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
1996 1998
23. PROJECT OWNER'S INFORMATION
a PROJECT OWNER
Finestra Development Corp,
b. POINT OF CONTACT NAME
Mark Kottler
c. POINT OF CONT ACT TELEPHONE NUMBER
305.604.1488
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size. and cost)
The Lincoln Cinema is an entertainment/retail complex in the heart of South Beach that brings restaurants. shops and an eighteen-screen
cinema to Miami Beach's famed Lincoln Road. The complex. which creates a signature west entry to the shopping/entertainment district.
is the first movie theater built on Miami Beach in over 40 years.
The cinema has a dramatic 110-foot marquee creating a landmark identity for the entire complex. The Lincoln Road fa<;ade is composed
of 42 foot high state-of-the-art architectural colored glass panels. which lights-up and animates Lincoln Road at night.
Cost: $ 20M
Size: 262K SF
.
.
STANDARD FORM 330 (1/2004) PAGE 1
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
Areawide and Districtwide Geotechnical Consultant, FOOT Districts 4 and 6, over from Monroe to
Osceola Counties
20. EXAMPLE PROJECT KEY NUMBER
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2003 - 2008 N/ A
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FDOT Districts 4 and 6 Materials Office Mr. Juan Castellanos, P.E. 954 475-4111
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and
laboratory testing programs, preparation of geotechnical engineering reports with foundation design and construction recommendations
for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1,5 millions. To date,
we have successfully executed 95 TWO and have spent $1.3 millions.
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
GEOSOL, lNC. GEOSOL, Inc.; 5795-A NW 15151 Street, Sf. Geotechnical Engineer
Miami Lakes, FL 33014
b. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20. EXAMPLE PROJECT KEY NUMBER
2
22. YEAR COMPLETED
NE 2nd Avenue Improvements, From NE 20Th to NE 87th Streets, City of Miami, FL
PROFESSIONAL
SERVICES
April to July 2005
CONSTRUCTION (If
applicable)
Has not started
C. POINT OF CONTACT TELEPHONE
NUMBER
The Cit of Miami c/o: DMJM Harris, Inc. Mr. Alex Meitin, P.E (305) 444-8241
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical
engineering report with foundation design and construction recommendations. Scope included collection of 20 asphalt pavement cores,
performance of 104 test borings and 40 percolation tests. Geotechnical fees were $46,630.
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME
a. PROJECT OWNER
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name
GEOSOL, INC.
b. (1) Firm Name
C. (1) Firm Name
d. (1) Firm Name
e. (1) Firm Name
f. (1) Firm Name
(2) FIRM LOCATION (City and State)
5795-A NW 15151 Street
Miami Lakes, FL 33014
(3) ROLE
Prime Consultant. Performed Geotechnical,
and Materials Testing Services
(2) FIRM LOCATION (City and State)
(3) ROLE
(2) FIRM LOCATION (City and State)
(3) ROLE
(2) FIRM LOCATION (City and State)
(3) ROLE
(2) FIRM LOCATION (City and State)
(3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
3
22. YEAR COMPLETED
SR-S/Byscayne Blvd. Improvements, From NE 14th to NE 38th Streets, City of
Miami, FL
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Dec. 04 to March 05 Has not started
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FOOT District 6 Mr. Jason Chan ,P.E. 305 470-5331
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Project Geotechnical Engineer responsible for planning the final design level geotechnical exploration and laboratory testing programs, preparation
of the geotechnical engineering reports for the proposed reconstruction. The geotechnical services for this project consisted in the performance of a
roadway soils survey including asphalt pavement coring along the existing City of Miami side streets in order to provide recommendations for the
proposed construction, 14 signalized intersections and 6 sign structures. The geotechnical services were performed using the requested scope of
services and the field exploration criteria established in the FOOT's Soils and Foundations Handbook (2004). Scope included 88 test borings for soil
survey, 59 pavement cores, 28 borings for signalized intersections, 6 borings for sign structures and LBR testing. Geotechnical fees during design
were $97,260.65
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
GEOSOL, INC. 5795-A NW 15151 Street Prime Consultant. Periormed Geotechnical,
Miami Lakes, FL 33014 and Materials Testing Services
b. (1) Firm Name
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
4
22. YEAR COMPLETED
SR 836 Extension, From NW 107th to NW 137th Avenues, Miami.Dade County, FL
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Jan.2004 to Dec. 2005
2004-2007
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade County Expressway Authority c/o Gannett Fleming, Inc. (786) 845-9540
(MDX) Mr. Luis Lazo, P.E.
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost)
Geotechnical project manager and senior engineer for this project. Design-Build project construction cost was $140,000,000. He was
responsible for design and implementation of the project's field exploration and laboratory testing programs. He is responsible for the geotechnical
engineering analyses and design for foundation elements of 9 bridges. He is also responsible for geotechnical engineering evaluations and
foundation recommendations for MSE retaining walls, sheet pile walls and signalization structures. He has already prepared preliminary geotechnical
engineering reports containing recommendations for foundation design and construction for the new bridges, MSE walls, sheet pile walls and
roadways. Geotechnical fees were $500,000
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
GEOSOL, INC. 5795-A NW 15151 Street Prime Consultant. Performed Geotechnical,
Miami Lakes, FL 33014 and Materials Testing Services
b. (1) Firm Name
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20. EXAMPLE PROJECT KEY NUMBER
5
22. YEAR COMPLETED
SR 826 and NW 36th Street Interchange, Miami-Dade County, FL
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2001-2003
2004-2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FOOT District 6 Mr. Ali To hiani, P.E. 305 470-5343
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Geotechnical project manager and senior engineer during the Final Design phase of this project. Responsible for design
and implementation of the project's field exploration and laboratory testing programs. Performed geotechnical engineering
analyses and design for foundation elements for the replacement of the 2 mainline bridges and a bridge widening on NW
36th Street over the Ives Dairy Canal. Driven piles will support the bridges. Also, performed geotechnical engineering
evaluations and provided recommendations for MSE retaining walls, critical sheet pile walls and sign structures.
Additionally, the project involved the evaluation of ground improvement methods and recommendations in the area of the
on Ramp "A". Also performed review and interpretation of aerial photographs to determine the horizontal limits of
trash/debris deposits that were placed in the late 1960's after the area was mined of its natural limestone formation. He
interpreted the results of the test borings and laboratory testing programs, evaluated and performed analyses of various
soil stabilization methods. Prepared geotechnical engineering reports containing recommendations for foundation design
and construction for the bridges, MSE walls, sheet pile walls and sign structures. The geotechnical reports were reviewed
and approved by the FOOT District geotechnical engineer. Geotechnical fees were $200,000
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
GEOSOL, INC. 5795-A NW 15151 Street Prime Consultant. Performed Geotechnical,
Miami Lakes, FL 33014 and Materials Testing Services
b. (1) Firm Name
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20. EXAMPLE PROJECT KEY NUMBER
6
22. YEAR COMPLETED
SR 826 and SW 8th Street Interchange, Miami-Dade County, FL
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2002-2003
On-going
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
FOOT District 6 Mr. AIi To hiani, P.E. 305 470-5343
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Geotechnical project manager and senior engineer during the Final Design phase of this project. Responsible for design
and implementation of the project's field exploration and laboratory testing programs. Performed geotechnical
engineering analyses and design for foundation elements of 5 bridge widening/replacements to be founded on driven
piles. The project also includes sheet pile walls, noise barrier walls (along the four ramps) and sign structures. Prepared
the geotechnical engineering reports containing recommendations for foundation design and construction for bridges,
sheet piles, noise walls and signs. Geotechnical fees were $200,000
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
GEOSOL, INC. 5795-A NW 151st Street Prime Consultant. Periormed Geotechnical,
Miami Lakes, FL 33014 and Materials Testing Services
b. (1) Firm Name
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
1. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
.
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
.
SW 88th Street/Kendall Drive On-Ramp to NB SR 874; Miami-Dade County, FL
20, EXAMPLE PROJECT KEY NUMBER
7
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
ON-GOING
b. POINT OF CONTACT NAME
C/O Corzo Castella Carballo Thompson
Salman P.A.
Attn.: Mr. Walfrido Pevida, P.E.
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Geotechnical project manager and senior engineer during the Final Design phase of this project. Responsible for design
and implementation of the project's field exploration and laboratory testing programs. Performed geotechnical
engineering analyses and design for foundation elements of a major new bridge to be founded on drilled shafts. The
project also included sheet pile walls, noise barrier walls sign structures and signalized intersections. He prepared the
geotechnical engineering reports containing recommendations for foundation design and construction for bridges, sheet
piles, noise walls, signs mast arms and roadways. Geotechnical fees were $400,000
2004-2005
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Miami-Dade County Expressway Authority
(MDX)
.
C. POINT OF CONTACT TELEPHONE NUMBER
(305) 445-2900
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1) Firm Name
GEOSOL, INC.
b. (1) Firm Name
C. (1) Firm Name
d. (1) Firm Name
e. (1) Firm Name
.t. (1) Firm Name
(2) FIRM LOCATION (City and State)
5795-A NW 15151 Street
Miami Lakes, FL 33014
(2) FIRM LOCATION (City and State)
(2) FIRM LOCATION (City and State)
(2) FIRM LOCATION (City and State)
(2) FIRM LOCATION (City and State)
(3) ROLE
Prime Consultant. Performed Geotechnical,
and Materials Testing Services
(3) ROLE
(3) ROLE
(3) ROLE
(3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20, EXAMPLE PROJECT KEY NUMBER
8
22. YEAR COMPLETED
NW 74th Street Interchange at the Homestead Extension of Florida's Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(HEFT), Miami-Dade County, FL April 05 - Jan. 06 ON-GOING
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
FOOT Turnpike Enterprise
C. POINT OF CONTACT TELEPHONE NUMBER
b. POINT OF CONTACT NAME
c/o Gannett Fleming, Inc.
Mr. Luis Lazo, P.E.
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Geotechnical project manager and senior engineer for this project. Responsible for design and implementation of the project's field exploration and
laboratory testing programs as well as for the geotechnical engineering analyses and design for foundation elements of 5 bridges, Also, performed
geotechnical engineering evaluations and. foundation recommendations for MSE retaining walls, sheet pile walls and signalization structures.
Prepared preliminary and final geotechnical engineering reports containing recommendations for foundation design and construction for the new
bridges, MSE walls, sheet pile walls and roadways. Geotechnical fees were $380,000
(786) 845-9540
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
GEOSOL, INC. 5795-A NW 15151 Street Prime Consultant. Performed Geotechnical,
Miami Lakes, FL 33014 and Materials Testing Services
b. (1) Firm Name
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
20. EXAMPLE PROJECT KEY NUMBER
9
22. YEAR COMPLETED
SR 836 Toll Plaza and Roadway Widening, From NW 87th to 107th Avenues, Miami. PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Dade County, FL April to Nov., 2005 2005-2007
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME C. POINT OF CONTACT TELEPHONE NUMBER
Miami-Dade County Expressway Authority C/o HNTB Corporation (305) 551-8100
(MDX) (Mf. Gorky Charpentier, P.E.)
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
Geotechnical project manager and senior engineer for this project. Responsible for design and implementation of the project's field exploration and
laboratory testing programs as well as for the geotechnical engineering analyses and design for foundation elements of toll plaza buildings,
canopies, sign structures and roadways. Prepared preliminary and final geotechnical engineering reports containing recommendations for
foundation design and construction for the structures and roadways. Geotechnical fees were $135,000
.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
.
a. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
GEOSOL, INC. 5795-A NW 15151 Street Prime Consultant. Performed Geotechnical,
Miami Lakes, FL 33014 and Materials Testing Services
b. (1) Firm Name
C. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
d. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
e. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
f. (1) Firm Name (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE 3
G KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS CONTRACT 28. EXAMPLE PROJECTS LISTED IN SECTION F
PERSONNEL (From Section E, (Fill in "Example Projects Key" section below before completing table. Place "X"
(From Section E, Block 12) Block 13) under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Robert J. Filusch, PE Project Manager X X X X X X X X
Joseph Rojas, PE Senior Highway Engineer X X X X X X X
Manuel Vega, PE Senior Drainage / X X X X X X X
Environmental Enaineer
Felix Cebrecos, MS Transportation Planner / X X X X X X X X X X
Traffic Enaineer
Gustavo Garrido, PE Cost Estimator X X X X X
Lou Belmonte, PE Constructability Engineer X X X X
Raul Rodriguez, PE, PLS Land Surveyor X X
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
Centra/Island Drainage & Street Improvements 6 SR-934/ Hialeah Expressway (FP #249985-1-52-01)
2
Golden Shores Drainage & Street Improvements
7
SR-25 / Okeechobee Road (FP #25105-2-52-01)
SR-80 / Southern Boulevard (FP #229498-1-52-01)
Fort Lauderdale-Hollywood International Airport
TrilA 4 F
Blue ridge Parkway, PRA-BLRI 2D-15
STANDARD FORM 330 (6/2004) PAGE 4
3
NE 12th Ave from NE 149th to NE 167th Street
8
4
NE 1 st and NE 2nd Avenue from N E 5th Street to N E 11 th Street
9
5
SR-5/ Brickell Avenue
10
.
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F
PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing
(From Section E, (From Section E, table. Place "X" under project key number for
participation in same or similar role.)
Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10
Bernard Z yscovich, AlA Managing Principal X X X X X X X X X
Suria Yaffar, LEED. AP Principal-in-Charge X X X X X X X X
Carolyn Mitchell, RLA Director of Landscape X X X X X X
Architecture/ Project
Manaqer
.
29. EXAMPLE PROJECTS KEY
NO TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1. Miami Media Entertainment District: 14th Street Miami Downtown Development Authority (DDA)
Streetscape 6. Miami Master Plan
2.
Flagler Streetscape Improvement
7. Hollywood Young Circle Urban Design
3.
Sistrunk Streetscape Improvement
8. Hollywood Beach CRA Master Plan
4.
FEC Master Plan
9. Miami Beach Convention Center
5.
Midtown Miami Master Plan
10. Lincoln Cinema
.
STANDARD FORM 330 (1/2004) PAGE 1
G KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F
PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing table. Place "X"
(From Section E, Block (From Section E, under project key number for participation in same or similar role.)
12) Block 13) 1 2 3 4 5 6 7 8 9 10
Oracio Riccobono, P.E Sr. Geotech Engineer X X X X X X X X X
Julio De Bias, P.E Sr. Geotech Engineer X
Reinaldo Villa, E.I. Project. Geotech Engineer X X X X X X X X X
Adnan Ismail, E.I. Project. Geotech Engineer X X X X X X X X X
Jose A. Gonzalez Sr. Geotech Technician X X X X X X X X X
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
Areawide and Districtwide Geotechnical Consultant, FDOT 6 SR 826 and NW 8th Street Interchange, Miami-Dade County,
SW 88th Street/Kendall Drive On-Ramp to NB SR 874; Miami-
2
NE 2nd Avenue Improvements, From NE 20Th to NE 87th
. ..
7
NW 74th Street Interchange at the Homestead Extension of
.,. . .
3
8
.4
5
9
SR 826 and NW 36th Street Interchange, Miami-Dade County,
10
H. ADDITIONAL INFORMATION
O. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
Since 1955, Beiswenger, Hoch and Associates (BHA) has been providing comprehensive consulting engineering services to federal, state and local
Departments of Transportation and various Counties and Municipalities. BHA has furnished its clients with complete highway engineering,
structural engineering, transportation planning, flood control, drainage design and construction supervision services. BHA provides professional
engineering services for highway, bridge, drainage and survey projects, including the design of related waterfront structures and bulkheads. In this
manner, all of BHA's personnel are involved with highway, bridge and drainage assignments in one capacity or another.
Roadwav and BridQe DesiQn Expertise
Over the years, we have successfully performed highway/bridge projects for the state Departments of Transportation of Florida, North Carolina,
South Carolina, Georgia, Tennessee, and Louisiana (states in the South Region). Our designs conform to the FHWA, AASHTO, NEPA, CEQ and
NHPA standards, criteria and procedures, flood control, drainage and environmental mitigation conform to DERM, SFWMD, SJRWMD, FDEP,
ACOE and FOOT.
As a leading consultant to the Florida Department of Transportation, BHA has a record of accomplishing efficient solutions for some of the most
difficult and complex roadway and bridge design projects within the state. We are a multidisciplinary consulting firm specialized in highway design
especially in highly constrained locations. Our recent design projects with highly relevant drainage and flood control design include:
Golden Shores Drainage & Street Improvements, Sunny Isles Beach, FL
Miscellaneous Civil Engineering Services
(4 contracts), Miami-Dade County, FL
NE 1 st and 2nd Avenues, Miami-Dade County, FL
SR 25 (Okeechobee Road), Miami-Dade County, FL
Hialeah Expressway/SR 934, Miami-Dade County, FL
NE 12th Avenue, Miami-Dade County, FL
Miscellaneous Civil Engineering Services
(3 contracts), Miami-Dade County, FL
SR 7 (US 441), Palm Beach County, FL
NW 87th Avenue, Miami-Dade County, FL
NW 62nd Street, Miami-Dade County, FL
Our services on the above projects included complete urban roadway and drainage design and all related site improvements.
Total CADD DesiQn Approach
.he development of the plans will be accomplished using state-of-the-art CADD hardware and software. BHA has over nine years experience in
sing CADD for design and production of complex roadway and bridge plans. This experience coupled with the firm's strong commitment to
innovation, research and development in this area has brought national recognition to BHA as a leader in CADD usage. In addition, BHA has
developed proprietary software for roadway, bridge and drainage design specifically on CADD. BHA's proprietary software has been proven to
accelerate and enhance the efficiency and accuracy of the plans production process.
One of the premier software packages developed by BHA is GEOPAK. GEOPAK is a comprehensive package for the design and production of
plans specifically on Microstation CADD systems. BHA developed and currently maintains and enhances GEOPAK using an in-house staff residing
in our headquarters office. GEOPAK is currently being used by nine governmental agencies as their roadway design software, which include
Florida, Mississippi, North Carolina, South Carolina, Illinois, Kansas and Minnesota Departments of Transportation, City of Edmonton, and the Army
Corps of Engineers.
Aesthetics
Beiswenger, Hoch and Associates takes pride in our approach towards project aesthetics. This approach has resulted in numerous engineering
design awards. BHA's in-house expertise on three-dimensional (3D) CADD software allows us to create a 3D model of an entire project, thereby
facilitating enhanced aesthetic and operational analysis. This 3D model is also a vital tool in developing appropriate presentation material for use
during the public involvement component of preliminary design and environmental analysis state, as well as the final design stage of the project.
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31. SIGNATURE
32. DATE
~A,~-~v-
September 10, 2007
.3. NAME AND TITLE
Robert B. Deuser, Vice President
STANDARD FORM 330 (6/2004) PAGE 5
.
.
.
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS
AS NEEDED.
Zyscovich, Inc., a 130+-person urban design, architecture and interior design firm headquartered in Downtown
Miami, Florida, has been known since 1977 for its significant urban, commercial, residential, and academic projects.
Located in the heart of downtown Miami, with additional offices in West Palm Beach and New York City, Zyscovich is
recognized for its work in urban design, architecture, interior design, master planning, historic preservation, and site analysis.
With projects ranging from the modest to the monumental, its imprint is evident throughout South Florida from master plans
and urban studies to mixed-use urban infill and residential high rises. Zyscovich Architects was recently listed as South
Florida's 5th Largest Architecture Firm in South Florida by the South Florida Business Journal.
Our team has extensive experience in bringing diverse groups to consensus on a variety of planning projects. We believe
that the successful preparation and implementation of a master plan is largely dependent on the quality of the community
involvement process and the full and accurate assessment and dissemination of relevant data and information. We will make
the investment in time and resources to ensure that the Leadership Group has a thoughtful and effective Community
Involvement Plan in place that will help guide process. The purpose of the Community Involvement Plan is to establish a
coherent and understandable public process that will generate and maximize community interest and involvement. The
following is a list of some of the firm's most recent awards:
AlA Florida 2007
Award of Excellence in Architecture
500 Block of Collins
AlA Florida 2007
Award of Excellence in Architecture
Mirador Garage
AlA Florida 2007
Unbuilt Honor Award
Downtown Miami DDA Master Plan
AlA Florida 2007
Unbuilt Merit Award
Hollywood Beach Master Plan
"T op Project in Florida" Award 2007
Real Estate & Construction Review
L.C. Swain Middle School
NAHB Multifamily 2007
Finalist for Best Mid-Rise Condominium Community of the Year
The Meridian
The School District of Palm Beach County
Outstanding Business Partner 2006
Zyscovich Architects
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
STANDARD FORM 330 (1/2004) PAGE 2
.
.
.
31 SIGNATURE
33. NAME AND TITLE
Bernard Zyscovich. AlA, Managing Principal
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
I. AUTHORIZED REPRESENTATIVE
The fore oin is a statement of facts.
32. DATE
September 10. 2007
STANDARD FORM 330 (1/2004) PAGE 3
ARCHITECT-ENGINEER QUALIFICATIONS
1. SOLICITATION NUMBER (If any)
.
Collins Ave Streetscape No. 07-07-03
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices. complete for each specific branch office seeking work.)
2a. FIRM (or branch office) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
Beiswenger, Hoch & Associates, Inc. 1955 07 -387 -9595
2b. STREET 5. OWNERSHIP
1190 NE 163rd Street, Suite 203 a.TYPE
2c. CITY 12d. STATE 12e, ZIP CODE Corporation
North Miami Beach, FL FL 33162 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE Yes
Robert B. Deuser, Vice President 7. NAME OF FIRM (if block 2a is a branch office)
6b. TELEPHONE NUMBER 16c. E-MAIL ADDRESS
954-334-2752 bobd@bhaenqineers.com Beiswenger, Hoch & Associates, Inc.
8a. FORMER FIRM NAME(S) (if any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
N/A N/A N/A
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of employees a. c. Revenue
Code b. Discipline (1) (2) Profile b. Experience Index Number
FIRM BRANCH Code (see below)
02 Administrative 10 B02 Bridges 6
06 Architects 2 C15 Construction Management 2
08 CADD Technicians 6 C16 Construction Surveyinq 1
12 Civil Enqineers 8 G01 Garaqes, Parkinq Decks 1
15 Construction Inspectors 6 H07 Hiqhways 6
16 Construction Manager 1 L02 Land Surveyinq 1
17 Construction Engineers 8 001 Office Buildings 6
18 Estimators 1 P06 Planning (site and project) 2
20 Economists 1 T03 Traffic and Transportation Enqineering 4
38 Land Surveyors 3 W01 Warehouse and Depots 1
47 Planners: Urban/Reqional 1
57 Structural Enqineers 8
60 Transportation Engineers 5
Other Employees
Total 60
11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(insert revenue index number shown at right) 2. $100,000 to less that $250,000 7. $5 million to less than $10 million
a. Federal Work 7 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
B. Non-Federal Work 1 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
c. Total Work 7 5. $1 million to less than $2 million 10. $50 million or greater
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
b. DATE
~ fi, /P.(v-
September 10, 2007
c. NAME AND TITLE
Robert B. Deuser, Vice President
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (6/2004) PAGE 6
ARCHITECT-ENGINEER QUALIFICATIONS
1. SOLICITATION NUMBER (II any)
RFQ No. 2006-58
.
2a. FIRM (OR BRANCH OFFICE) NAME 3 YEAR ESTABLISHED 4. DUNS NUMBER
Zyscovich, Inc. 1986
2b. STREET
100 N. Biscayne Blvd. 2ih Floor 5. OWNERSHIP
2c. CITY I ~tATE I 2e. ZIP CODE a TYPE
Miami 33132 Corporation
6a. POINT OF CONTACT NAME AND TITLE b SMALL BUSINESS STATUS
Bernard Zyscovich, AlA, Managing Principal N/A
6b. TELEPHONE NUMBER I 6c. E-MAIL ADDRESS 7. NAME OF FIRM (If block 2a is a branch office).
305-372-5222 mail@zyscovich.com N/A
Ba FORMER FIRM NAME(Si (If any) Bb. YR. EST ABlISHED Bc. DUNS NUMBER
Zyscovich Architects 1977
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL
AVERAGE REVENUE FOR LAST 5 YEARS
a. c. No. of Emplo ees c. Revenue
Fun (1) FIRM (2) BRANCH b. Experience Index
ctlO a. Profile Number
n b. DIscipline Code (see below)
Cod
e
02 Administrative 22 A06 Airports: Terminals & Hangars 4
06 Architect 82 2 C06 Churches: Chapels 3
08 CADD Technician 0 Cl0 ~~~p~i~~'~'e~t~'~ngs (lOW nse) 1
15 Construction Inspector 14 DO? Dining Halls: Clubs: Restaurants 1
37 Interior Designer 5 E02 Educational Facilities: Classrooms 6
39 Landscape Architect 1 F02 ~Iela Houses: uyms 1
47 Planner: Urban/Regional 3 GOl \?arages: Vehicles Marnt f-acllltles: 1
Parklna Decks
Computer Operations/Network Manager 1 HOB Historical Preservation 1
Hl0 Hotels: Motels 1
Hl1 Housing 7
105 Interior Design 3
L04 Libraries: Museums: Galleries 1
P05 Planning (Community. Regional) 5
P06 r'lannrng (:::Ol1e. Installation & r'roJect) 5
R04 ~t~c{eatlona aClltles ('"arKS. IVlannas. 3
R06 Rehabilitation 5
U02 Urban Renewals: Community DeveL 3
ZOl Zoning: Land Use Studies 3
Total 128 2
11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(lnser1 revenue index number shown at riqht) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 0 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
b. Non-Federal Work 8 4. $5000,000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work 8
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
.
12. AUTHORIZED REPRESENTATIVE
The fore oin is a statement of facts.
a. SIGNATURE
.
b. DATE
September 10,
2007
C. NAME AND TITLE
Bernard Zyscovich, AlA, Managing Principal
.1. SIGNATURE
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
132 DATE
33. NAME AND TITLE
STANDARD FORM 330 (6/2004) PAGE 5
ARCHITECT-ENGINEER QUALIFICATIONS
1. SOLICITATION NUMBER (If any)
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (or branch office) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
GEOSOL. INC. 2000
2b. STREET 5. OWNERSHIP
5795-A NW ]51sT Street a. TYPE
2c. CITY 2d.STATE 12e. ZIP CODE Corporation
Miami Lakes FL 33014 b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE DBE
Oracio Riccobono. P.E. 7. NAME OF FIRM (if block 2a is a branch office)
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS N/A
(305) 828-4367 Geoso]usa@bellsouth.net
8a. FORMER FIRM NAME(S) (if any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
N/A N/A
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of employees a. c. Revenue
Code b. Discipline (1) (2) Profile b. Experience Index Number
FIRM BRANCH Code (see below)
Administrative 1 27 Geotechnical Services in 2006 5
Civil Enaineers 3 27 Geotechnical Services in 2005 5
Soils Enaineers 2 27 Geotechnical Services in 2004 5
Enaineerina Technicians 5 27 Geotechnical Services in 2003 4
Draftmen 1 27 Geotechnical Services in 2002 4
27 Geotechnical Services in 2001 3
Other Emolovees
Total 12
.
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(insert revenue index number shown at right)
. Federal Work
$1,500,000
$1,500,000
. Non-Federal Work
c. Total Work
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000
2. $100,000 to less that $250,000
3. $250,000 to less than $500,000
4. $500,000 to less than $1 million
5. $1 million to less than $2 million
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
6. $2 million to less than $5 million
7. $5 million to less than $10 million
8. $10 million to less than $25 million
9. $25 million to less than $50 million
10. $50 million or greater
a. SIGNATURE
-<l 6- ~~ /? ()
~
I b DATE
. 8/28/07
c. NAME AND TITLE
Oracio Riccobono, P.E.
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
.
.
STANDARD FORM 330 (6/2004) PAGE 6
.
.
.
SWORN STATEMENT PURSUANT TO SECTION 287.133 (3) (A),
FLORIDA STATUES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHOIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted to
by: Francisco A. Norona, President
(print individual's name and title)
for: Beiswenger, Hoch and Associates, Inc.
(print name of entity submitting sworn statement)
Whose business address is: 510 Shotgun Road, Suite 400, Sunrise, FL 33326
and (if applicable) its Federal Employer Identification Number (FEIN) is: 59-0751610
(If the entity has no FEIN, include the Social Security Number of the individual signing this sworn statement:
. )
2.
I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or of the United
States, including but not limited to, any bid or contract for goods or services to be provided to any public
entity or an agency or political subdivision of any other state or of the United States and involving antitrust,
fraud, theft bribery, collusion, racketeering, conspiracy, or material misrepresentations.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287 . 133(1)(b ), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guild, in any federal
or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a
result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
4. In understand that an "affiliate" as defined in Paragraph 287. 133(1)(a), Florida Statues, means
A. A predecessor or successor of a person convicted of a public entity crime; or
B. An entity under the control of any natural person who is active in the management of the entity and who
has been convicted of a public entity crime. The term "affiliate" includes those officers, directors,
executive, partners, shareholders, employees, members and agents who are active in the management of
an affiliate. The ownership by one person of shares constituting a controlling interest in another person,
or a pooling of equipment or income among persons when not for fair market value under and arm's
length agreement, shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public entity crime in
Florida during the preceding 36 months shall be considered an affiliate.
5.
I understand that a "person" as defined in Paragraph 287.133(1)( e), Florida Statues, means any natural person
or entity organized under the laws of any state or of the United States with the legal power to enter into a
binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a
public entity, or which otherwise transacts or applies to transact business with a public entity. The term
"person" includes those officers, directors, executives, partners, shareholders, employees, members and agents
who are active in management of an entity.
.
.
.
6.
Based on information and belief, the statement which I have marked below is true in relations to the entity
submitting this sworn statement. (Indicate which statement applies.)
. Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, nor any
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
o The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
o The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
Florida, Division of Administrative Hearings and the final Order entered by the hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list (attach a copy of the final order).
I UNDERST AND THAT THE SUBMISSIONOF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND
THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS
FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO
ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUTN PROVIDED IN SECTION
287.017, FLORIDA STATUTES FOR CATEGORY TWO OF ANY CHANGE IN THE INFORMATION
CON D IN S FORM
Francisco A. Norona, President
(Printed or Typed Legal Name of Affiant)
State of Florida
Broward
County of
Sworn to and subscribed before me this
10th
, 2007 by
September
day of
Francisco A. Norona, President
Lind, S. S'ot", ~,Lv !l~
Notary's Name Printe ,Stamped or Typed
Notary Seal:
.
:~r-:,~'"~lfl""
~lf:t~1:~
t ~.J!!;"Q~
't! .'~i:;{f"~~:-'~
fl. ".......,.
UNDA s. SCOTECE
MY COMMISSION # DO 240707
EXPIRES: December 13, 2007
Bonded Thill Notary P~lic UndelWl1ters
Personally Known: X
Identification Produced
Or Produced Identification
.
.
.
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOT AR Y PUBLIC
OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
I. This sworn statement is submitted to the Citvof Sunny Isles Beach. Florida.
by Bernard Zyscovich. AlA
for Zyscovich. Inc.
whose business address is 100 N. Biscayne Boulevard. 27th Floor. Miami. FL 33132
and (if applicable) its Federal Employer Identification Number (FEIN) is 59-2754852
(IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:
2_ I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes,
means a violation of any state or federal law by a person with respect to and directly related to the
transaction of business with any public entity or with an agency or political subdivision of any
other state or of the United States, including, but not limited to, any bid or contract for goods or
services to be provided to any public entity or an agency or political subdivision of any other state
or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering,
conspiracy, or material misrepresentation.
3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287.133(1 )(b), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a
plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287. I 33(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity come. The term "affiliate" includes those
officers, directors, executives, partners, shareholders, employees, members, and agents who are
active in the management of an affiliate. The ownership by one person of shares constituting a
controlling interest in another person, or a pooling of equipment or income among persons
when not for fair market value under an arm's length agreement, shall be a prima facie case that
one person controls another person. A person who knowingly enters into a joint venture with a
person who has been convicted of a public entity crime in Florida during the preceding 36
months shall be considered an affiliate.
5. I understand that a "person" as defined in Paragraph 287. 133(1)(e), Florida Statutes, means any
natural person or entity organized under the laws of any state or of the United States with the
legal power to enter into a binding contract and which bids or applies to bid on contracts for the
provision of goods or services let by a public entity, or which otherwise transacts or applies to
transact business with a public entity. The term "person" includes those officers, directors.
.
.
.
executives, partners, shareholders, employees, members, and agents who are active In
management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a relation to
the entity submitting this sworn statement. (Please indicate which one (1) of the following three
(3) statements is applicable.)
_ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the management
of the entity, or any affiliate of the entity has been charged with and convicted of a public entity
crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the management
of the entity, or any affiliate of the entity has been charged with and convicted of a public entity
crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the management
of the entity, or agents who are active in management of the entity, or any affiliate of the entity has
been charged with and convicted of a public entity crime within the past 36 months. However, there
has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of
Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the
public interest to place the entity submitting this sworn statement on the convicted vendor list.
(Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS FOR
THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31
OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE
CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND
THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A
CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017,
FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE
INFORM~ TION -Cill): ~INED IN THIS FORM.
~K/~ Bernard Zyscovich, AlA
SIGNATURE OF AFFIANT (Printed or Typed Legal Name of Affiant)
State of FL
County of DADE
Sworn to and subscribed before me this 11/1.- day of
J3~lWrd 21;;fM/V/c4-...
l/se-fl--L ;v!ar(~ S/Vr/OC--
6.ep/&~, 2007 by
Notary Seal:
Notary's Name Printed, Stamped or Typed
Personally Known: ~
Identification Produced
or Produced Identification
J'II / ff
/
"{;;'::";j;;:,, USETIE MARIE SIERRA
~l:'" ''';
f:: . ~;~ MY COMMISSION' DO 590520
~\ .W EXPIRES: September 4,2010
"!;Jt:Ri( ,'fr,"f>' Bonded Thill Notary Public UnderwriteB
.
NON-COLLUSIVE AFFIDA vir
State of Florida
County of Broward )
Francisco A. Norona, President, Beiswenger, Hoch & Associates, Inc. being first duly sworn,
deposes and says that:
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all
pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
.
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired, connived
or agreed, directly or indirectly, with any other Bidder, fiml, or person to submit a collusive or sham
Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from
bidding in connection with such Work; or have in any manner, directly or indirectly, sought by
agreement or collusion, or communication or conference with any Bidder, firm, or person to fix the
price or prices in the attached Bid or of another Bidder, or to fix any overhead, profit, or cost elements
of the Bid price or the Bid price of any other Bidder, or to secure through an collusion, conspiracy,
connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or
any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any
collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its
agentsz:, cep:'~'ntativ'S?,,~~;::;arties in intecest, including this Affiant
/ /. ~ / ~ /;~ '- Francisco A. Norona, President
IGNA TURE- OF AFFIANT (Printed or Typed Legal Name of Affiant)
State of Florida
County of
Broward
Sworn to and subscribed before me this
loth
day of September
, 2007 by
Francisco A. Norona, President
Linda S. Scotece
Notary's Name Printed,
Personally Known: X
Identification Produced
Or Produced Identification
Notary se<a~l:
~ .~,'I:'~U:""
f' .,,~~...~~
{<f' 'h,.' '3"~
l~'~"'~~
j i ...~~:.9W~~~.:
LINDA S. SCOTECE
MY COMMISSION # 00 240707
EXPIRES: December 13, 2007
Bonded Thru Notary Public Unde1Wllters
.
.
NON-COLLUSIVE AFFIDA VIT
State of FL
)
County of DADE
)
Bernard Zyscovich. AlA
deposes and says that:
being first duly sworn,
(I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
.
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representati ves,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage
against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
other of its agents, representatives, owners, employees or parties in interest, including this
Affiant. ~ /
~~~~
SIGNATURE OF AFFIANT
Bernard Zyscovich. AlA
(Printed or Typed Legal Name of Affiant)
State of FL County of DADE
Sworn to and subscribed before me this / / ~ay of 5' ~~07 by