Loading...
HomeMy WebLinkAboutBerger Avart, Inc. ~.--"':""-"".-.' 1------'" 1- ..~ - - .. - -.. - ~. 1 I j I I I I 1 I ~ Su. .bmitted >1.0.: -;0.... ',-.' ," i.'~.. - '_'" '.~ '-' ~: r.! ':\ ~ ~ ~ 1M.. 8 .CITY OF' .!., ".,', .,...........,.. ,-, SUNNY t~LESBEAtH': ~ E r.' ~ He l Submitted by: 1 I BergerAvart II'~CORPORATED .. - In Association With: The Louis Berger Group Terracon Consultants Inc. F .R. Aleman & Associates, Inc. Savino & Miller Design Group RECEIVED SEP 1 2 2007 W 10.0:::> q. r". Clly ~ s~ ... Be8ch omce ollhe Clerk September 12, 2007 1150 NW 72nd Avenue, Suite 350, Miami, Florida 33126 Tel. (305) 261-2006 · Fax (305) 261-2123 I I I I I I I I I I I I I I I I I I I Berger Avart I r.j F A 1 [j Airport Executive Tower 1 1150 NW 72nd Avenue, Suite 350, Miami, FL 33126 Tel (305) 261-2006 . Fax (305) 261-2123 September 12, 2007 Ms. Jane A. Hines, CMC City Clerk City Clerk's Office Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 Re: RFQ #07-07-03 Professional Design Services for the Collins Avenue Streetscape Dear Ms. Hines: Berger Avart, Inc. is pleased to have this opportunity to present our professional qualifications to provide the requested Professional Design Services for the Collins Avenue Streetscape Project as outlined in the Request for Qualifications. We are a local, multi-disciplined engineering and architectural firm having successfully provided high-quality professional services to various South Florida municipalities, federal and private clients for over 25 years. Berger Avart has a proven track record with its clients. We have become a leading firm in delivering design and construction administration services. Berger Avart, as an industry leader in civil, structural, transportation planning, roadway and highway engineering design, and construction management, have developed a uniquely qualified "Team". Our response is specifically formulated to meet the evaluation factors as set forth in the Proposal Requirements, and assures that all disciplines are fully covered with experienced and knowledgeable personnel. Our team of professionals is able to offer the City of Sunny Isles Beach a comprehensive staff with outstanding credentials, coupled with an effective support staff for this important effort. Berger Avart is ready to assist the City in providing the required professional design and construction inspection services. We understand the concerns and needs of our clients, which has led to streamlining our processes for increased efficiency and improved response time. This type of response is imperative to maintain the budget and schedule. At Berger Avart, our mission is to provide our clients with professional, seamless service while being responsive to their needs and requirements at all times. Our team is immediately available to meet your needs. As in the past, we look forward to extending our continuous and successful relationship with the City of Sunny Isles Beach. Sincerely, BERGER AVART, Inc. G(;[" ~ [, ~--~- '/- - )( \ ' Luis Olivares, P.E. President I I I I I I I I 1 II I I I 1 I I I I 1 I I Section 1. 2. 3. 4. 5. 6. 7. 8. 9. Berger Avart RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape r-~ :: (\ f.i P R ll. r f Table of Contents Page TECHNICAL COMPETENCE 1a. Qualifications of the Team ...............................................................................1 1 b. The Project Manager's Specific Technical Competency................................... 3 PROJECT UNDERSTANDING AND APPROACH 2a. The Firm's Thorough Understanding of the Scope of Work.............................. 5 2b. The Firm's Identification of Significant Project Issues....................................... 6 2c. The Constructability of the Firm's Approach..................................................... 7 EXPERIENCE 3a. The Firm's Experience with Similar Projects in Scope and Size ....................... 7 See Form SF 330, Firm Experience Section for Details. 3b. The Firm's Experience with Municipal Projects ................................................9 AVAILABILITY OF STAFF 4a. The Firm's Ability to have Staff Readily Available for the Project.................... 11 4b. The Firm's Ability to Keep Staff Readily Available for the Project................... 13 EXPERIENCE WITH SUNNY ISLES BEACH 5a. The Firm's Familiarity/Experience with SIB's Construction Codes.................. 13 5b. The Firm's Familiarity/Experience with SIB's Development Codes................. 13 PERFORMANCE ISSUES 6a. The Comparison of the Firm's Estimates and Low Bids for Past Two Years.. 13 6b. The Firm's Compliance with Budgets for the Last Two Years ........................13 6c. The Firm's Compliance with Schedules for the Last Two Years ..................... 14 Form SF 330 Licenses Sworn Statement and Non-Collusive Affidavit ~--_.- I I 1. I 1a. II I I I I I I I I I I I I I I I Berger Avort RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape h .~ n R F ") ~{ tI r F [' TECHNICAL COMPETENCE Qualifications of the Team Berger Avart, Inc., in association with the Louis Berger Group, Terracon Consultants Inc., F.R. Aleman & Associates, Inc., and Savino & Miller Design Group, is pleased to submit our qualifications to provide Professional Design Services for Collins Avenue Streetscape Project for the City of Sunny Isles Beach. Our team has provided professional engineering services in South Florida (including various Miami-Dade County Departments, governmental agencies and FDOT Districts) and has a highly qualified and available staff with broad-based capabilities in all phases of roadway design, parks, streetscape, bridge, building, construction administration and support services. Our team, with its staff of dedicated personnel, will provide the City with a timely, cost effective solution for this project. As a result of our successful project management skills and design expertise, we have a proven track record on a multitude of similar projects. Each task will be adequately staffed with the appropriate experienced personnel described in this section. Our foremost priority will be to provide superior quality service to the City and to submit the project on time and within budget. Berger Avart has assembled a team of exceptional professionals that will provide the requisite services for the successful design of this project. It is important to note that Berger Avart has an existing working relationship with various local Agencies, as well as the subconsultants invited to participate on this project. These subconsultants have worked well with us in the past, and we are confident that these relationships will serve to benefit the City again. Our Organizational Chart and Resumes of Key Personnel assigned to this project are included. Key Personnel: Our proposed Project Manager, Un U, P.E., has 15 years of civil, drainage, site development, roadway design and construction administration experience. He also is experienced on ERP, NPDES, SWPPP, Canal Right of way permits and storm water modeling. Mr. Li will lead Berger Avart's efforts on this project and will be the primary contact for the City Project Manager. Alfredo Reyna, P.E., has over 23 years of Civil Engineering experience in the planning, design and coordination/management of major highway projects. He will assist Mr. Lin Li. Luis Olivares, P.E., as Principal-in-Charge, will provide support to Mr. Li and the entire Team, and will lead the Quality Assurance/Quality Control effort. Arthur Miller, P.E., in charge of Constructability/Bidability Review, has over 40 years of engineering and administration experience, encompassing all phases of civil and structural engineering projects. Jorge Canales, P.E. has over 37 years of structural engineering experience. Please see the following Chart of "Qualifications/Experience of Key Personnel". At Berger Avart, our mission is to provide clients with professional, seamless service while being responsive to their needs and requirements at all times. Our proposed staff is immediately available to meet your needs. - 1 - I I I I I I I I I I I I I I I I I I I Berger Avort f'.; ( c~ R P .> R ;:. r F L RFQ 07-07 -03 Professional Design Services for the Collins Avenue Streetscape Qualifications/Experience of Key Personnel !. . . Years of Name ! Project Assignment ! Firm Name i E . : :: xpenence -------------------------------------------------------------------j-----------------------------------------------------------------------------------------r--------------------------------1--------------------------------- --=!-~--~~:--~-~~-:---------m--------------mm--------ul~~~!_==~_~_:_~_:_~=_~~_~_~~~~~_~_~:_~~_:~___________m___mm~--~-=~-~=-~,~-~:-~--mt-------mm-~-=--,-----mm __:_~~=u~~~~_~:_==~__~:_~~_mmmmnnnmnm~-~~~~-~~~-~~~!-~~_~~_~:_~:__:_~~__~~~_~______m___________m~n~,=~~:-~-~-~:_~_____~-----mmm~-~--------m--- Alfredo Reyna, P.E. ! Roadway ! Berger Avart I 23 -------------------------------------------------------------------~----------------------------------------------------------------------------------------t--------------------------------1--------------------------------- --~~~-~~--~!!-I-:~~-~~-=-~----------------------------l_~_~_~_=~~~_=~:_~~~~~~_~_~~~_:_~~~~~~__~=_~~=_~_______-----m----1--~-=~-~=-~-~-~:-~----)m----------~-~~--m---mn __:~_~~_=__~:_~:_~==:__~:_=:___m_______________m~--~~~-~_=~_~~_:~__=_~~!_~=_=~_______________m_m__m________mm______~--~-=~-~=-~--~-~:-~-----~----------m-~-~m-----m--- German Arenas, CBI I Structures Engineer I Berger Avart I 12 ------------------------------------------------------------------T----------------------------------------------------------------------------------------T--------------------------------1--------------------------------- ,_~~_~_~:n~~~_~~_=~n________________________________~--~_~~~~__=_~~_i_~=_=~mmm___________________________________m___________~--~-:~-~=-~-~-~:-~nm~----------h--~-~mmm--m Ruben Ilizarbe, E.!. I Civil Engineer i Berger Avart i 5 -------------------------------------------------------------------t'"-----------------------------------------------------------------------------------------t'"--------------------------------1--------------------------------- --~~~=~~--~~-~~--------mnm--------------------m--t--=-~~~~~_~~_=_~_~:_~_~=!_:~_~~=~_________________mm__________-m--t--~-=~-~=-~--~-~:-~m--1mmmmm~-~--------mm h=~=-~~~--~~~-~~--~~~----------------------mml-~~~-~-=~_~~_~~__=_~~!_~=_:~______m____mm_m_____________m_m____~--~-:~-~=-~-~-~:-~m-J------------~-=nm----h--- Fredric Nagler, R.A. I Architect I Berger Avart i 36 -------------------------------------------------------------------r----------------------------------------------------------------------------------------T--------------------------------1--------------------------------- Jorge Haberkorn i Architectural Designer i Berger Avart i 17 ------------------------------------------------------------------t----------------------------------------------------------------------------------------t--------------------------------i--------------------------------- David Aimen, AICP ! Urban Planner ! Louis Berger i 20 -------------------------------------------------------------------i-----------------------------------------------------------------------------------------i--------------------------------1--------------------------------- Bradley Decker, AICP i Urban Planner j Louis Berger j 21 ! i i ------------------------------------------------------------------T----------------------------------------------------------------------------------------T--------------------------------T-------------------------------- n~:~~~_~_~~~=_~~__~_~:_._~~________________m__m__~--=:-~~_==~_~=_~~=~_i_~=_~~m_____________________m_________m--nn~--~-~~~-~-~--~!!!-=:-----l--------m---~-~-------_m___ Adriana Savino, P.L.A. ! Landscape Architect ! Savino Miller! 3 , " , " -------------------------------------------------------------------f------------------------------------------------------------------------------------------f---------------------------------1--------------------------------- , " , " Amazia Kikobo, P.E. ! Traffic Engineer ! FRA ! 5 , " , " -------------------------------------------------------------------+------------------------------------------------------------------------------------------+------------------------------------------------------------------ , " , " Arthur Cushnie, P.E. ! Lighting and Signalization Engineer ! FRA ! 23 , " , " -------------------------------------------------------------------}------------------------------------------------------------------------------------------}---------------------------------~--------------------------------- , " , " Fernando Gartell, P.L.S. j Survey & Mapping i FRA i 26 , " , " , " -2- II I I I I I I I I I I I I I I I I I I Berger Ava rt h,~nRP )F,'Ari~r RFQ 07 -07 -03 Professional Design Services for the Collins Avenue Streetscape 1b. The Project Manager's Specific Technical Competency Mr. Li has 15 years of experience in highway and civil design and construction administration. He serves as Project Manager for BERGER AVART on various civil and roadway projects. Clients include Miami-Dade County, Broward County, the Miami-Dade County School Board, the School Board of Broward County, the Florida Department of Transportation and local municipalities. His project experience includes water, sewer and drainage systems design; paving design; canal dredging; roadway design; maintenance of traffic; environmental permitting; and project coordination and inspection. The following projects summarize his professional experience: ~ Village of Bal Harbour, (Project Manager/City Engineer) · Project Manager responsible for the design and construction services of the Collins Avenue and 96th St. Streetscape and Bus Shelters Project, including new bus shelters and receptacles, concrete sidewalk replacement, electrical design and utility coordination. (Cost: $480,000; Design Fee: $32,000). Client Contact: Alfred Treppeda, Village Manager, Tel: 305 866-4636. · Water tank and distribution system study for the Village of Bal Harbour, Miami-Dade County, Florida. Used Cybernet (WaterCad) by Haestad Methods to model the water system and demonstrated that existing water tank could be demolished; completed the water tank demolition and water system repiping design and construction administration. Client Contact: Alfred Treppeda, Village Manager, Tel: 305 866-4636. ~ SR 84 from Glades Parkway to Weston Road, Florida Department of Transportation, District IV, (Project ManagerIDesign Engineer). The scope of this project includes milling and resurfacing, public involvement, RRR Report, ADA upgrade, construction of missing concrete sidewalk, pavement design, photogrammetry, topographical survey, signing and pavement marking and MOT. (2006 to Present), Client Contact: Bing Wang, P.E., Project Manager, Tel: 954 777-4406. ~ City of Aventura, (City Engineer) · Performed plan review and inspections for the Public Works Departments. · Prepared annual NPDES Report for the City to EPA, FDEP and DERM. · Worked on Capital Improvement Projects, including NE 34th Avenue Lighting and Roadway Improvements. · Aventura Entrance Design (Aventura Blvd.) and construction administration. · New Bus Shelter Design along Biscayne Blvd. (US-1). Client Contact: Alan Levine, Superintendent, 305 466-8931, Antonio Tomei, Capital Projects Manager, Tel: 305466-8923. ~ Need Assessment Program, Miami-Dade Water and Sewer Department, (Project Manager). Design and construction administration services for local water and sewer transporting network improvements countywide. (2001 to Present). Client Contact: Reynaldo Abreu, MDWASD Project Manager, Tel: 786552-8161 · MISC-71 - Water Main Extension Project at SW 36th Avenue between SW 9th Street and SW 8th Street · QN-61A - Water Main Extension Project at SW 18th Street and 12th Avenue · UWMR-49A - Water Main Extension Project at East Dixie Highway, NE 103rd Street · UWMR-90B - Water Main Extension Project at Emathla Street and Seminole Street · UWMR-61A - Water Main Extension Project at SW 16th Avenue between SW 1st Street and SW Flagler Terrace -3- I I I I 1 1 I I I 1 1 I I I I I I I 1 Berger Avort RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape li'~..~()RP)RArr.f ? SR 909 West Dixie Highway from NE 119th St. to NE 151st St, Florida Department of Transportation, District VI. (Project Manager). Roadway design included the restriction of turning movements at intersections; construction of raised landscaped medians along selected locations to restrict turning movements and to improve aesthetics and sight visibility; upgrading the facility for handicap accessibility; milling and resurfacing; new signalizations including pedestrian signal features; signing and pavement marking; and construction administration services. (Design completed, 1/05) (Construction: 1/05-07/07). Client Project Manager: Adriana Mazanares, Project Manager, Tel: 305470-5283. ? Country Walk Drainage Basin Improvements Design, Miami-Dade County DERM. (Project Manager). Roadway improvements and drainage design for an approximately one square mile area known as Country Walk in Miami-Dade County (Country Walk Basins No.1, 5, 6 & 7). Tasks also included Interconnected Channel and Pond Routing Modeling, Environmental Resource Permit (ERP) and Right of Way Permits with South Florida Water Management District. (ICPR)(2001-2005) ? SR 973 - Sunset Drive and Galloway Road Intersection Improvement, Florida Department of Transportation, District VI. (Project Manager). Roadway design for adding an additional lane to this intersection in Miami-Dade County. This urban RRR project includes roadway, signing and pavement marking, lighting, signalization and landscape components. Construction administration service is also included. (2001-2004) ? SR 607 - Emerson Avenue, Florida Department of Transportation, District IV. (Project Engineer). Roadway design and construction administration services for this rural RRR project in St. Lucie County. This project includes RRR, shoulder widening, drainage and canal bank improvements. (2001-2004) ? Flamingo Fall Retail and Professional Center, Sheridan St. and Flamingo Road, City of Pembroke Pines, (Project ManagerlDesign Engineer). Provided design and permit services for 8.5 acres of new development for a proposed five-story retail and professional center, including water and sewer, drainage, outfalls and irrigation. Acquired drainage permits through the local Drainage District and South Florida Water Management District, water main extension permits from County Health Department, and sewer extension permit from County Environmental Department. (2004 to 2006) ? Grand Palms Drive Intersection Improvement Design, Grand Palms Golf Club and Resort, City of Pembroke Pines (Project Manager). This roadway intersection improvement design at SR 814 (Pines Blvd.) and SW 155th Ave. included adding an additional left turn lane at the intersection, traffic report and queue calculation, traffic signal modification, roadway widening, drainage improvement, and tree relocation. Permitted thorough FDOT, South Broward Drainage District, Broward County Traffic Engineering and the City of Pembroke Pines. (2001-2003) ? Portable Classroom Relocation Design, Miami-Dade County Public Schools (Project Manager). Worked on Portable Classroom Relocation Design and utility connections for Miami Jackson Sr. High, Barbara Goleman Sr. High, C.O.P.E. North Center. (2001-2002) ? St. Boniface Gardens, Archdiocese of Miami (Project Manager). Worked on this 3.2-acre private land development project for two residential buildings in the City of Pembroke Pines, Broward County. Duties included: coordination for land plot application and approval, site geometrics, paving and drainage, water and sewer systems, pump station, canal crossing and -4- I I I I I I I I I I I I I I 1 1 I I 1 Berger Avort i'.; ,~ 0 !? P ) R A r ~: L RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape improvement, offsite improvement on Johnson Street, a bus bay design on University Drive, and permitting through various agencies, including FDOT and ERP. (1998-2001) y Goulds Canal Repair and Restoration Project, Miami-Dade Public Works Department (Project Manager). Worked on the design of plans and cross sections for this canal dredging project in Miami-Dade County. (2000-2001) y St. Ann's Gardens, Archdiocese of Miami (Project Manager). Worked on this 4.15-acre land development project for a residential building located in south Miami-Dade County. Reponsible for design of site geometrics, paving and drainage, water and sewer systems, pump station, and permitting, including ERP permit. (1999-2001) y Jefferson at Young Circle, JPI Florida (Project Engineer). Worked on this 6.15-acre downtown redevelopment project in the City of Hollywood, including two apartment buildings and a parking garage. Responsible for designing water and sewer systems, drainage and roadway improvements, and permitting. (1999-2001) y Jefferson at Douglas Entrance, JPI Florida (Project Engineer). Worked on this 1.6-acre commercial development project in the City of Coral Gables. Designed water and sewer systems, paving and drainage; obtained ERP permit. (2000-2001) y Perrine Health Unit, Miami-Dade County Health Department (Project Manager). Worked on this 5.31-acre community redevelopment project located in south Miami-Dade County. Responsibilities included site geometrics, water and sewer systems, paving and drainage, and ERP permit. (2000-2001) y Port of Miami Terminal 8 & 9 Parking Garage and Surface Parking Lot, Port of Miami (Project Engineer). Designed site geometrics, roadway improvements, paving and drainage (deep injection drainage wells), and water and sewer systems for this 4.67-acre port property. (1999-2001 ) PROJECT UNDERSTANDING AND APPROACH 2. 2a. The Firm's Thorough Understanding of the Scope of Work The following is an overview of our project approach to the work called for by the RFQ: When the City assigns this project to us, key members of our staff will visit the site again to have firsthand and in-depth knowledge of existing conditions and to identify any potential conflicts that could have an impact on the constructability of the project. Berger Avart's Project Manager, Lin Li, P.E., will meet with the City's Project Manager, to present our field visit data, prepare initial recommendations and obtain concurrence prior to commencing the project. Upon identifying the tasks needed for this project, Berger Avart will prepare the staff hour estimate and fee proposal and submit it to the City's Project Manager. We will submit a CPM project schedule and begin work immediately, once receiving a Notice to Proceed. Having worked closely with various public agencies in the past, we understand the importance of providing recommendations for alternative solutions that will save the City time and expenses. At the beginning of this project assignment, Berger Avart will collect existing information including: as- builts, field surveys, aerial mapping, geotechnical data, traffic investigations, and any preliminary analysis and information that may be required. We will coordinate with other disciplines, such as - 5- I I I I I I I 'I I I I I I I I I I I I Berger Avort i-..; C ("\ R P ") R P. r [ L RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape structural. Verification of preliminary recommendations for compliance to City, DERM, HRS, FDOT, FDEP, USACE and other agencies' requirements will be done during this early stage of the design process. A meeting with any permitting agencies will be requested to clarify any drainage or other environmental issues. A coordination meeting will take place with utility companies owning facilities within the project limits. Our goal at this early phase is to have all relevant design issues explored and our approach established. Plan Submittals: The phased plan submittals will include: . Preliminarv Desiqn Enqineerinq and Report: Project Design Report, Conceptual Drainage Report, initial landscape and roadway plans, summary of field review, updated construction cost estimates, and CAD files in proper format. . Final Desiqn Enqineerinq: Project final plans, specification package, utility agreements/certifications, detailed engineer's estimate of construction cost, QAlQC review set with response to comments and permit application submittals, and final field review. . Final Bid Packaqe: Final plans and specifications, bid package and documentation, and CAD files in proper format. The Berger Avart Team will also provide Construction Administration Services for the City, including a response to the RFI, review of change orders, on-site inspection and preparing inspection reports with photo logs, project as-builts and project close-out. We will provide our professional services for the City of Sunny Isles Beach from initiation to construction completion. 2b. The Firm's Identification of Significant Project Issues Collins Avenue (A1A) is an FDOT Roadway so we are very limited as to what we can do. There are many beach accesses throughout Collins Avenue at the east side. The existing median is very hard to move, widen or enhance. We will follow the City's direction to enhance the east side and west side of Collins Avenue. The City has approved and adopted an Ordinance to acquire a 10-foot wide easement on both sides of Collins Avenue throughout the project corridor. Utilizing these easements, we will propose to widen the sidewalks, create a landscape buffer between the streets and the roadside properties. We will develop special signage with identification of the City's images. The proposed landscape improvements along the project corridor will require intense coordination with the FDOT Permit office. The most important stakeholders are the property owners on both sides of Collins Avenue. As representative of the City, we will spearhead the effort to work with the property owner, and convince them that the proposed features will beautify the street, enhance the appearance of their properties and help their businesses. New lighting will be proposed, with identical features as the ones in North Bay Road, just south of NE 172nd Street. New bus shelters, benches and trash receptacles will be proposed at the bus stop locations to create a welcoming environment for residents and visitors. The widened sidewalk will have a special weaving pattern, pavers or other patterns, with matching landscape elements. New paver cross walks will be proposed at all the intersections and mid block crossing locations. The main purpose is to create a pedestrian friendly ambience. With the beautified streetscape, it will act as a traffic calming device to slow the through traffic down. Signing/Wayfinding: This project involves the inventory of existing signage throughout the project limits to establish existing conditions diagrams. The effectiveness of existing signage for both vehicular traffic and pedestrian traffic will be evaluated. Based on the signage inventory and evaluation, a -6- ,I I I II I I I I I I I I I I I I I I I Berger Avort [''; ,~ n R P ") R A r ~- r RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape signage/wayfinding program that integrates into and complements the streetscape will be designed to improve guidance to local venues. 2c. The Constructability of the Firm's Approach The City's ordinance will make this sidewalk widening and beautification possible. Since we will have the 10 foot easement on both sides of Collins Avenue, we will have the space to create the oasis in this urban center. New landscape, hardscape, lighting and irrigation systems will be designed and constructed to make the City's wish into a reality. 3. EXPERIENCE 3a. The Firm's Experience with Projects Similar in Scope and Size Please see Form SF 330, Firm Experience Section for Details. Projects for the Village of Bal Harbour . Project Manager responsible for the design and construction services of the Collins Avenue and 96th St. Streetscape and Bus Shelters Project, including new bus shelters and F receptacles, concrete sidewalk replacement, electrical design and utility coordination. (Cost: $480,000; Design Fee: $32,000). Client Contact: Alfred Treppeda, Village Manager, Tel: 30S 866-4636 . Water tank and distribution system study for the Village of Bal Harbour, Miami-Dade County, Florida. Used Cybernet (WaterCad) by Haestad Methods to model the water system and demonstrated that existing water tank could be demolished; then completed the water tank demolition and water system repiping design and construction administration. Client Contact: Alfred Treppeda, Village Manager, Tel: 30S 866-4636 . Bal Harbour Park Design and Construction Administration: Project Mana~er for this park project located at Intracoastal Water and 96t Street Bridge, N.E. Corner. Projects for the City of Aventura . Performed plan review and inspections for the Public Works Departments. . Prepared annual NPDES Report for the City to EPA, FDEP and DERM. . Worked on Capital Improvement Projects, including NE 34th Avenue Lighting and Roadway Improvements, . Aventura Entrance Design (Aventura Blvd.) and construction administration. . New Bus Shelter Design along Biscayne Blvd. (U.S. 1). Client Contact: Alan Levine, Superintendent, 30S 466-8931, Antonio -7- -- I I I I I I I I I I I I I I I I I I I I I Berger Avort f'.~'_(\RP )RI>'f[L RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape Tomei, Capital Projects Manager, Tel: 305466-8923. Country Walk Drainage Basin Improvements Design (Miami-Dade County DERM). We provided the design for a new french drain system for drainage improvements to one square mile of a flood prone residential area. We proposed new outfalls to Canal C-1W; performed ICPR modeling for the system stages and peak discharges at outfalls; Prepared ERP and Canal RIW permit applications with SFWMD. City Hall Landscape Design and Construction Administration, Sunny Isles Beach. Our open space design concept integrates the City Hall site and adjacent restaurant into a cohesive urban setting. A large fountain embraces the council chambers, providing a continuous seating area for passerby and employees alike, terminating at a small courtyard adjacent to the library. The plaza was designed to expand north as part of a future City Hall expansion project. The interplay of the shimmering water and lights on the blue mosaic wall creates a civic nighttime display. Services: Site Master Plan, Schematic Design through Construction Phase Services for Planting, Paving, Site Lighting, Irrigation, and Fountain Design. Project Cost: $750,000. Espanola Way Streetscape Improvements, Miami Beach, Florida. The design program was to develop a street plaza which reflected the surrounding historic village located on Espanola Way in Miami Beach. A continuous plaza, designed without curbs, is designed to encourage street festivals and daily social interaction. A future fountain is planned for the center of the plaza. Our design services included decorative paving, site lighting, site furniture, and planting. Services: Master Planning, Schematic Design through Construction Phase Services. Project Cost: $400,000 -8 - 1 I I I 1 I I 1 I I 1 1 I I I I I I I Berger Avort r'~ (! R P ) R /< T ~: L RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape Washington Avenue Streetscape Master Plan, City of Miami Beach. This is a streetscape beautification project in the heart of the Miami Beach Art Deco District. The design and construction process for this project, presently ongoing, includes an exhaustive community consensus- building process, historical analysis, site analysis, development of Opportunity/Constraint maps, Alternative Design & Phasing Plans, Final Design/Cost Estimate Plan, and Construction Documents/Administration. Services: Master Plan, Schematic Design Plans, Design Development, Construction Documents and Construction Phase Services. Project Cost: $3,300,000. ~ '''''' - -, -'-- _::- . .: t ... -..-., 3b. The Firm's Experience with Municipal Projects Venetian Causeway Toll Plaza and Administration Building, Miami, FL. We inspected the present facility and prepared estimates for refurbishment, and also 3 alternatives for replacement of the current toll plaza. One of the alternatives for replacement was then selected and developed to schematic level with numerous potential aesthetic designs and landscaping schemes. Numerous meetings ensued with the Venetian Causeway Homeowner's Association and the County T ARC Committee to arrive at an acceptable design. After this was achieved, construction documents for the new toll facility and adjacent administration building, with landscaping, bike paths, and walkways were prepared. The toll plaza contains six vehicle lanes with attendant booths and complete electronic toll collection equipment. The separate Administration Building provides management headquarters for all Miami-Dade County toll facilities, communication, public decal sales, and staff support facilities. The construction cost for this project was $1.5 million. Miami International Airport Chiller Plant Expansion, Miami, FL. Berger Avart provided Structural Engineering services for the expansion of the Central Chiller Plant at Miami International Airport and prepared all documents including design, calculations, construction, drawings, specifications and cost estimates. We were retained to provide structural design and construction documents for approximately 100,000 square feet of additional space to expand the existing 6-story, 139-foot high central chiller plant to accommodate a new chilled capacity of 16,000 tons of refrigeration for the Miami International Airport. This required providing a 150% increase in capacity on a very restricted site, while maintaining an uninterrupted supply of chilled water. The structure supports extremely heavy equipment loads, piping of up to 60" in diameter, ice storage tanks, and integral cooling towers. The complex structure includes both cast-in-place and precast concrete elements. Piping and equipment in the existing structure was replaced, requiring extensive re-evaluation of the existing structure. Included in the effort was the transfer piping system carrying chilled water to and - 9- I I I I 1 I I I I I I I I I I I I I I Berger Avort i',,; ;~. n ~ P ") R ,6 f r L RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape from the remote airport terminal building. Approximately 3,000 linear feet of chilled water piping was supported on the existing roof to distribute the chilled water to eight concourses. The existing structure was analyzed and devices designed to safely distribute this new load. Total construction cost for this project was $65 million. Krome Avenue (SR 997) at Tamiami Trail (Florida Department of Transportation, District VI), Miami Dade County. Improvements included roadway and bridge widening, roadway intersection design, signing and pavement marking, drainage, lighting and signalization design. We also provide permit applications with various agencies, including wetland impact assessment and remediation asstance. SR 836 Reconstruction from NW 27th Avenue Including Toll Plaza, Miami t Dade Expressway Authority. Berger Avart, as a sub-consultant to MK Centennial, provided CEI services on a $35 million reconstruction job for the If Miami-Dade Expressway Authority (MDX) on SR 836 from NW 2th Avenue including toll plaza reconstruction. The objective of the project was to improve _ the level of service, through the utilization of the "Express Sun Pass Lanes" ~ (Automated Vehicle Identification-A VI) and increasing the processing capacity at the toll from 7,350 vehicles per hour to 12,400 vehicles per hour. SR 973-Sunset Drive & Galloway Road Intersection Improvements (FDOT, District VI), Miami-Dade County. This urban RRR project includes roadway widening, signing & pavement marking, lighting, signalization and landscape components. Construction administration services were also included. Lakeview Elementary School Drainage Improvements, Miami-Dade County Public Schools. Improvements for court yard, parking lots and playfield were proposed to eliminate the flooding condition during heavy rain storm. Countywide Drainage and Canal Dredging, Miami, FL, Miami-Dade County Department of Environmental Regulations Management (DERM). We provided construction management services for the repair of infrastructure damage as a result of severe flooding. The projects include placing exfiltration trenches and other drainage systems throughout Miami-Dade County to reduce flooding and related property damage from future storms. Also included in this contract is the design, construction inspection and administration on several canal dredging projects throughout Miami-Dade County. The construction cost for this project was $5 million. Enhanced Hurricane Protection Area (EHPA) Design, Various Schools, School Board Broward County. Berger Avart provides field inspection, report, design, permitting and construction inspection for the roof top equipment protection plans, for EHPA. Lake Stevens Parent Drop Off, Miami Dade County Public Schools: provided the design of a 600 foot parent-student drop-off including passing lanes, sidewalk curb and gutter section. A canopy was designed to cover sidewalk leading to main building. Engineering involved paving, drainage, grading, irrigation and landscaping. A traffic study was -10 - I I I I I I I I I I I I I I I I I I I Berger Ava rt h',~(\RP iRftTFL RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape implemented to investigate impacts at the adjoining intersection and, roads and to determine the length of the drop off. US 1/0verseas Highway at Snake Creek, Monroe County This project involved the improvements to an existing two lane, two way highway. Services provided included paving, grading, drainage, signing and marking, maintenance of traffic control plans, roadway and shoulder widening, bike path, guardrail, sheet pile wall and other roadway enhancements. SR 5 (US 1) from SW 112th Avenue to SW 152"d Street, Miami-Dade County. This project involved the improvements to an existing six lane divided roadway. Services provided included paving, grading, drainage, signing and marking, and roadway enhancement to bring the facility up to safe functional levels. RRR of SR 5 (US 1) from SW 112th Avenue to SW 152"d Street. (Miami- Dade County, FDOT District VI). This project involved the improvements to an existing six-lane undivided roadway, under very heavy traffic. Services provided included paving, grading, drainage, signing/markings, lighting, signalization and overall enhancement to bring the roadway up to adequate structural and functional levels. SR 607 (Emerson Avenue) from SR 614 (Indrio Road) to the St Lucie County Line, (FDOT District IV) Improvements on this rural two lane facility include, pavement milling and resurfacing, slope stabilization, drainage, relocation of roadway signs and mail boxes which were originally located inside the clear zone and installation of guard rail. Reconstruction of SR 91 / Florida Turnpike. Reconstruction from North Miami Toll Plaza to NW 199th Street (Pro-Player Stadium Exit). Project includes roadway reconstruction and a new bridge over Miami Gardens Drive. The new cross section consists of a six-lane divided highway with paved median and concrete barrier wall, and roadway transitions to a super-elevated section to meet current design criteria. . .... . .,~~ ,,;c"~,- - 2.~:r "- . ~(.::. ~ . "4 i\ . 4. AVAilABILITY OF STAFF 4a. The Firm's Ability to have Staff Readily Available for the Project Staffing Availability and Workload Distribution: All key personnel in Civil and Roadway Construction are immediately available for assignments. The total company availability for the Civil and Roadway Construction Service category is about 64% for the next 6 months. See Current/Projected Resource Tables next. -11 - I I I I I I I I I I I I I I I I I I I Berger Avort f'...: C n q P RAT [ L RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape BERGER A V ART'S CURRENT/PROJECTED WORKLOAD Staff-Hours Per Quarter 4th QTR 1 st QTR ACTIVE PROJECTS CLIENT YR 2007 YR 2008 Miami Springs Middle School MOCPS 480 240 SR 826 (Palmetto at SR 41) FOOT - 6 100 100 SBBC Peer Review SBBC 240 240 SBBC Staff Assistance SBBC 120 120 EHPA Roof Top Protection SBBC 120 120 Palmetto Senior Hiqh School MOCPS 200 200 Sunset Elementary School MOCPS 200 200 Water Main Extension Oesiqn MOWASO 120 120 Behia Honda Bridqe Oesiqn FOOT - 6 200 100 SR 84 Roadway Oesiqn FOOT - 4 200 200 School "WNW' Threshold Insp. MOCPS 100 100 Other Misc. Projects VARIOUS 400 330 Total Per Quarter 2480 2070 Grand Total 6 Months 4550 BERGER A V ART'S CURRENT/PROJECTED RESOURCES HOURS PERCENT HOURS PERCENT COMMITTED COMMITTED AVAILABLE AVAILABLE TOTAL STAFF ON OTHER ON OTHER FOR THIS FOR THIS NAME POSITION HOURS PROJECTS PROJECTS PROJECT PROJECT Lin Li, P.E. Project Manaqer 960 200 21% 760 79% Luis Olivares, P.E. QA Engineer 960 600 63% 360 38% Alfredo Reyna, P.E. Civil Engineer 960 300 31% 660 69% Arthur Miller, P.E. Structural Enqineer 960 400 42% 560 58% Jorqe Canales, P.E. Senior Enqineer 960 500 52% 460 48% Norma Alvarez Civil Enqineer 960 200 21% 760 79% German Arenes Proiect Enqineer 960 600 63% 360 38% Ruben lIizarbe, E.!. Civil Enqineer 960 200 21% 760 79% Everton Kinq Proiect Enqineer 960 300 31% 660 69% Mary Cardenas Civil Engineer 960 200 21% 760 79% TOTALS 12480 4550 36% 7930 64% Assume 160 hours per month for each full time person x 6 months = 960 hours Technician hours are not included; however, technicians are available at approximately the same overall availability of 64%. - 12 - ,--- -- I I I I I I I I I I I I I I I I I I I I Berger Avort jh-~nRPJRprr\ RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape 4b. The Firm's Ability to Keep Staff Readily Available for the Project Our office is only 25 minutes away from the City and project site. We are readily available to meet with City's representative on the job site and City Hall, within 30 minutes. 5. EXPERIENCE WITH SUNNY ISLES BEACH 5a. The Firm's Familiarity/Experience with SIB's Construction Codes Our team is very familiar and experienced with the City's Construction Codes. Our team member Savino Miller, worked on the City Hall Landscape Design and Construction Administration between 2004 - 2005. The open space design concept integrates the City Hall site and adjacent restaurant into a cohesive urban setting. A large fountain embraces the council chambers, providing a continuous seating area for passers by and employees alike, ending at a small courtyard adjacent to the library. The plaza was designed to expand north as part of a future City Hall expansion project. The interplay of the shimmering water and lights on the blue mosaic wall creates a civic nighttime display. Services: Site Master Plan, Schematic Design through Construction Phase Services for Planting, Paving, Site Lighting, Irrigation, and Fountain Design. Project Cost: $750,000. 5b. The Firm's Familiarity/Experience with SIB's Development Codes Our team is also familiar and experienced with the City's Development Codes. In the same Sunny Isles City Hall Project, we studied the SIB's Development Codes and made sure our project development was in compliance with said Codes. 6. PERFORMANCE ISSUES 6a. The Comparison of the Firm's Estimates and Low Bids for Past Two Years Construction Variance Cost Bid Award Year of wI Budget Project Project Location Estimate Amount Bid (%) Role Lakeview Elementary Drainage Miami-Dade $265,000 $285,000 2006 -7% PR Improvements Seminole Elementary Playfield Miami-Dade $220,000 $210,000 2000 +5% PR Drainaqe West Dixie Hiqhway Resurfacinq Miami-Dade $4.2 mil $4.5 mil 2000 -7% PR Palmetto Senior High School Miami-Dade $6.8 mil $6.4 mil 2000 +5% PR Renovation 6b. The Firm's Compliance with Budgets for the Last Two Years Awarded Total E&O Year Contract CIO CIO Project Project Location Completed Amount Percentage Percentage Role Lakeview Elementary Drainage Miami-Dade 2006 $25,000 0 0 PR Improvements Seminole Elementary Playfield Miami-Dade 2007 $17,000 0 0 PR Drainaqe West Dixie Hiqhway Resurfacing Miami-Dade 2007 $120,000 0 0 PR Palmetto Senior Hiqh School Miami-Dade On Going $455,000 0 0 PR - 13 - I I I 6c. I I I I I I I I I I I I I I I I Berger Avort IN r-qplF,',ATF[ RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape The Firm's Compliance with Schedules for the Last Two Years Design Phase to Design Phase to Construction Construction Explanation Permit Approval Permit Approval Phase Phase Project PLANNED ACTUAL PLANNED ACTUAL Start/Finish Start/Finish Start/Finish Start/Finish Lakeview Elementary 8/2005, 6/2006 7/2005, 6/2006 6/2006, 7/2006 6/2006, 7/2006 On Schedule Drainaqe Improvements Seminole Elementary Minor 1/2006,4/2006 2/2006,4/2006 9/2006, 12/2006 10/2006, 1/2007 Construction Playfield Drainage Delay West Dixie Highway 2/2004, 12/2004 2/2004, 12/2004 11/2005, 5/2007 11/2005,7/2007 Construction Resurfacinq Delav -14 - I I I I I I I I I I I I I I I I . ~:rg"~r~,:,art OF SUt-l RFQ # 07-07-03 PROFESSIONAL DESIGN SERVICES for The Collins Avenue Streetscape .~ - - - CONSTRUCT ABILITY PROJECT MANAGER QUALITY ASSURANCEI REVIEW QUALITY CONTROL Arthur Miller, P.E. (SA) Lin Li, P.E. (SA) Luis Olivares, P.E. (SA) . --- -- -. :.J ... ..1 r I I CIVIL ENGINEERING LANDSCAPING I TRAFFIC ENGINEERING I PLANNING / LIGHTING SIGNALIZATION ECONOMIST Lin Li, P.E. (SA) Adriana Savino (SM) Amazia Kikobo, P.E. (FRA) David Aimen, AICP (LSG) Alfredo Reyna, P.E. (SA) Norma Alvarez (SA) Sarry Millar, P.L.S. (SM) Sradley Decker, AICP (LSG) Ruben lIizarbe, E.!. (SA) Talita Gutierrez (SM) I Arthur Cushnie, P.E. (FRA) I . . I I I I STRUCTURAL ARCHITECTURE ENVIRONMENTAL / SURVEY I GEOTECHNICAL PERMITTING/CEI Arthur Miller, P.E. (SA) Fredric A. Nagler, R.A. (SA) Cristy Boyd (SA) Fernando Gartell, PLS (FRA) Jorge Canales, P.E. (SA) Juan J. Haberkorn (SA) Pablo Cubeddu (SA) Alex Montenegro, P.E. (TC) German Arenes (SA) Jorge Garzon (SA) Luis Pinillos (SA) Everton King (SA) I Nila Denza (SA) . I . . .. -- - -- j - - . City of Sunny Isles Beach Miami-Dade County, Florida Rick Conner, Engineering & Public Works JJ I SA - Berger Avart, Inc.; FRA - F.R. Aleman and Associates, Inc.; 8M - Savino-Miller Design Group; Ie - Terracon Consulting Engineers, Inc.; LSG - Louis Berger Group I I I I I I I I I I I I I I I I I I I I I 7. Berger Avort ! r'~ ,= (\ R P ) P, A r F r RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape Form SF 330 I I I I I I I I I I I I I I I I I I I Berger Avort RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape fi.:C',P PATI! BERGER AVART, INC. I I I I I I I I I I I I I I I I I I I ARCHITECT-ENGINEER QUALIFICATIONS PART 1- CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Desiqn Services for the Collins Avenue Streetscape 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER July 26, 2007 RFQ No. 07-07-03 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Luis A. Olivares, P.E., President 5. NAME OF FIRM Berqer Avart, Inc. 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS (305)261-2006 (305)261-2123 L 01 iva res@beraeravart.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) B 11. ROLE IN THIS ... t.J nl 9. FIRM NAME 10. ADDRESS Ql ... CONTRACT c:: 1: t nl 0 Ql Il. t.J E .D. .;: :::- =' Il. ..., lJ) a. ~ 0 0 Berger Avart, Inc. 1150 NW 72nd Ave Civil & Structural Suite 305 Engineering, Planning and Miami, FI33126 Architectural Design. o CHECK IF BRANCH OFFICE (Prime) b. 0 0 ~ The Louis Berger Group 30 Vreeland Road Building A Florham Park, NJ 07932 [8] CHECK IF BRANCH OFFICE c. 0 0 ~ Savino & Miller Design Studio 12345 NE 6th Avenue Landscape Architecture Suite 360 o CHECK IF BRANCH OFFICE North Miami, FL 33161 d. 0 0 ~ Terracon Consultants Inc. 10080 NW 53rd Street Geotechnical Sunrise, FL 33351 o CHECK IF BRANCH OFFICE e. 0 0 ~ F.R. Aleman and Associates, Inc. 10305 NW 41 st Street Traffic and Survey Suite 200 Miami, Florida 33178 o CHECK IF BRANCH OFFICE f. 0 0 0 o CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM [8] (Attached) STANDARD FORM 330 (1/2004) PAGE 1 I I I I 1 I 1 I I I I 1 I I I 1 I I I ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any) RFQ 07-07-03 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER Berger Avart, Inc. 1981 N/A 2b. STREET 5. OWNERSHIP 1150 NW 72nd Ave, Suite 350 a. TYPE 2c. CITY 12d. STATE 12e. ZIP CODE Corooration Miami FL 33126 b, SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Luis A. Olivares, President 7. NAME OF FIRM (If block 2a. is a branch office) 6b TELEPHONE NUMBER 16C. E,MAIL ADDRESS (305) 261-2006 LOI ivares@bergeravart.com 8a. FORMER FIRM NAME(S) (If anv\ 8b. YR ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS c No of Employees c. Revenue a. Function b. Discipline a. Profile b, Experience Index Code (1) FIRM (2) BRANCH Code Number (see be/ow) 02 Administrative 2 2 A06 Airoorts, Terminals, etc. 3 08 CADD Technician 3 3 A11 Auditoriums and Theaters 3 12 Civil EnQineer 6 6 B02 Bridaes 4 15 Construction Insoector 4 4 C10 Comm. BuildinalLow Rise) 2 52 Sanitary EnQineer 3 3 C15 Construction Manaaement 4 56 Soecification Writer 1 1 007 Dinina Halls; Clubs; Restaurants 3 57 Structural EnQineer 5 5 E02 Educational Facilities; Classrooms 4 H07 Hiohwavs' Streets' Airfield Pavino 5 101 Industrial Buildinas 1 106 Irriaation; Drainaae 3 L05 Liahtina (Interior), 1 L06 Liahtina (Exterior) 1 001 Office Buildinas; Industrial 2 P02 Petroleum and Fuel 1 P06 Plannina (Site, Installation) 2 R06 Rehabilitationlbuildinos; Structures) 2 S04 Sewaae Collection, Treatment and Disoosal 1 S09 Structural Desian; Soecial Structures 3 S13 Storm Water Handlina and Facilities 5 T02 Testina and Insoection Services 6 T03 Traffic and Transoortation Enaineerinq 1 Olher Emolovees W03 Water Suoolv; Treatment and Distribution 1 Total 24 24 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 $2 million to less than $5 million FOR LAST 3 YEARS 6. (Insert revenue index number shown at right) 2. $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The fore oin is a statement of facts. b. DATE September 12, 2007 STANDARD FORM 330 (6/2004) PAGE 1 II F. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13, ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b, WITH CURRENT FIRM Project Manager 15 6 I 12. NAME Un U, P.E. I 15. FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) MS, Civil Engineering P.E., Florida #49520 (1995)-Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers, Member; National Society of Professional Engineers, Member; Florida Engineering Society, Member I I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 909 WEST DIXIE HIGHWAY FROM NE 119TH ST. TO NE 151ST ST. PROFESSIONAL SERVICES I CONSTRUCTIONOf aoolicable (FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT VI) 2005 (Design) I Current (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8:J Check if project performed with current firm a. Project Manager. Roadway design included the restriction of turning movements at intersections; construction of raised landscaped medians along selected locations to restrict turning movements and to improve aesthetics and sight visibility; upgrading the facility for handicap accessibility; milling and resurfacing; new signalizations including pedestrian signal features; signing and pavement marking; construction administration services. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 607 - EMERSON AVENUE (FLORIDA DEPARTMENT OF PROFESSIONAL SERVICES I CONSTRUCTION lif acclicable TRANSPORTATION, DISTRICT IV) 2000 I 2004 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8:J Check if project performed with current firm b. Project Engineer. Roadway design and construction administration services for a rural RRR project in St. Lucie County. This project includes RRR, shoulder widening, drainage improvements, cross culvert reconstruction and canal bank improvements. (Cost: $1.55 million; Design Fee: $430,000) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED STREETSCAPE & BUS SHELTERS IN COLLINS AVE., VILLAGE BAL PROFESSIONAL SERVICES I CONSTRUCTION lif acclicable HARBOUR, FLORIDA 1999 I 2001 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8:J Check if project performed with current firm c. Project Manager responsible for the design and construction services of the Collins Avenue Streetscape and Bus Shelters Project, including a new bus shelters and receptacles, concrete sidewalk replacement, electrical design and utility coordination. (Cost: $480,000; Design Fee: $32,000) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION if aoolicable NEEDS ASSESSMENT PROGRAM, MIAMI-DADE COUNTY, FL Current I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8:J Check if project performed with current firm Project Manager responsible for the design of local water and sewer transporting network improvements countywide. Projects under this d. contract include: . QN-61A - Water Main Extension Project at SW 18th Street and 127th Avenue (Design Fee: $70,000) . UWMR-49A - Water Main Extension Project at East Dixie Highway, NE 103 Street (Cost: $796,000; Fee: $57,000) . UWMR-90B - Water Main Extension Project at Emathla Street and Seminole Street . UWMR-61A - Water Main Extension Project at SW 16th Avenue between SW 1st Street and SW Flagler Terrace . MISC-71 - Water Main Extension Project at SW 36th Avenue between SW 9th Street and SW 8th Street - I I 1 1 1 I I 1 I I (1) TITLE AND LOCATION (City and State) Iicable 1 FLAMINGO FALLS PROFESSIONAL CENTER, PEMBROKE PINES, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE 2004 N/A [8:J Check if project performed with current firm' I e. Project Manager in charge of the design and civil engineering services for Flamingo Falls Professional and Retail Center-Parcel Two (8.37 acres) including an over-flow parking area, located west of Flamingo Road and north of Taft Street in the City of Pembroke Pines. Tasks for this project include the preparation of the final paving, grading and drainage plans based on a topographical survey and schematic engineering plan. Also included are the site geometric plans, signing and pavement markings plans, and final design of water and sanitary sewer for the proposed development. I STANDARD FORM 330 (1/2004) PAGE 2 I I E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT 12, NAME I Luis A. Olivares, P.E. Quality Assurance/Quality Control a. TOTAL 25 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 2 I 15. FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) 1 BS, Civil Engineering P.E., Florida #49708 (1995)-Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) I Florida Engineering Society, Board of Directors; American Society of Civil Engineers, Member; Cuban American Society of Civil Engineers, Member I (1) TITLE AND LOCATION (City and State) (2fYEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable UNIVERSITY OF MIAMI PARKING GARAGE, CORAL GABLES, FL 2004 I 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Project Manager responsible for the civil site design and permitting of a new 15-story clinical research building and 11-story parking garage. The site consists of 350,000 SF of office space, 510,000 SF of parking garage on a 3.58-acre parcel. Due to an existing utility easement, a. which bisected the property and needed to be mitigated, the site required the rerouting and relocation of existing sanitary lines that handled offsite flows while being placed under the constraints of no additional lift-stations. Due to the substantial flows this facility would be imposing on the existing wastewater system, the site also required the design of a new pump station for the Miami-Dade Water and Sewer Department (WASD). This pump station was designed for 965 gallons/min and included a generator house as an emergency back-up facility. To satisfy the twenty-five year storm design criteria, the site was designed with deep wells and emergency overflows. In addition and as required by WASD, a new 12" water main was designed to run the length of the city block and throuQh a maior intersection. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable HOMESTEAD HOSPITAL, HOMESTEAD, FL 2003 I 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm b. Project Manager responsible for the civil site design including contract management and construction administration services, technical reviews and quality control. The project consisted of a 150-bed hospital with out patient facilities, which totals approximately 320,000 SF with 5 out parcels for future expansion. The 60-acre site was developed to accommodate a 1,500 space parking lot, over half a mile of a 2-lane service road and one mile of a 4-lane divided roadway. Other improvements included the design of approximately 6,000 LF of 12-inch water main, 1,500 LF of 8-inch gravity sanitary sewer main, 1,600 LF of sanitary sewer force main, a Diesel Fuel service station, and a 950 gpm sanitary sewer lift station. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable COMFORT, MAINSTAY & SLEEP INN HOTELS SITE DEV., MIAMI, FL 1996 11998 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm c. Project Manager in charge of the design, permitting and construction of this project located on NW 36th Street. The assignment consisted of the development of contract documents including plans, technical specifications, an opinion of construction cost, and construction administration services. The project consisted of designing the site drainage for a 3~ acre site, pavement and grading of parking areas and utilities relocation. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable EDISON K-8 AND 117B CHARTER SCHOOLS, MIAMI, FL 2001 1 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm d. Project Manager responsible for contract management and construction administration services, technical reviews, and quality control for the site development of these new schools including water (potable and fire protection), sewer, paving, grading, drainage, electrical and communication. - I I I I I I I I I I (1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION if a Iicable 2004 I FEDERAL EXPRESS HUB, MIAMI, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 2003 o Check if project performed with current firm e. Project Manager for this project which consisted of the design and construction of the airside and lands ide pavements, as well as all site utilities such as water and sewer system, electric and communications ductwork, site lighting and drainage improvements, to serve a new sort warehouse building. Also responsible for all elements of the coordination of the permitting process, safety plans, construction phasing and maintenance of operations. I I STANDARD FORM 330 (1/2004) PAGE 2 I I 12, NAME E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT 54 14. YEARS EXPERIENCE lb. WITH CURRENT FIRM 25 Arthur J. Miller, P.E. Constructability-Sidability Review a. TOTAL I 15. FIRM NAME AND LOCATION (CIty and State) Berger Avart, Inc., Miami, Florida 16, EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) I MS, Civil Engineering P.E., Florida #21471 (1961)-Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) I I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable VENETIAN TOLL AND ADMINISTRATION BUILDING, MIAMI, FL 2003 I 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm a. Structural Engineer for the preparation of construction documents for a new toll facility and adjacent administration building, with landscaping, bike paths, and walkways. The toll plaza contains six vehicle lanes, with attendant booths and complete electronic toll collection equipment. The separate administration building provides management headquarters for all Dade County toll facilities, communication, public decal sales, and staff support facilities. (Cost: $1.5 million) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable MIA CHILLER PLANT EAST EXPANSION, MIAMI, FL 2001 I 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm b. Structural Engineer for the preparation of construction documents for approximately 100,000 square feet of additional space to expand the existing six-story, 139-foot-high central chiller plant to accommodate a new chilled capacity of 16,000 tons of refrigeration for the Miami International Airport. This required providing a 150% increase in capacity on a very restricted site, while maintaining an uninterrupted supply of chilled water. (Cost: $65 million; Design Fee: $500,000) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED EHPA INSPECTIONS, CERTIFICATIONS & REPORTS, BROWARD PROFESSIONAL SERVICES I CONSTRUCTION (if applicable COUNTY, FL 2006 I N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm c. Certifying engineer of record to perform EHPA re-certification inspection of all schools located throughout Broward County that contain shelter facilities. As per the Florida Building Code (FBC) Section 24 (0, all designated Enhanced Hurricane Protection Areas (EHPA's)/Shelters shall be inspected and certified for compliance with the structural requirements of FBC Section 24, Public Shelter Design Criteria, every 5 years by a Florida registered professional engineer skilled in structural design. The original design plans for each school were reviewed and the school inspected to determine whether the school was constructed to code as per the design plans. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable GEN. STRUCTURAL ENGINEERING SERVICES, BROWARD COUNTY, FL 2003 I N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm d. Engineer of Record serving as an extension of the Broward County School Board Facilities Design group for the structural review of a multitude of new school and renovation projects designed by other firms. This effort included many major schools and prototype designs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable OLYMPIA HEIGHTS POST OFFICE, MIAMI, FL 1992 11993 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE ~ Check if project performed with current firm e. Project Manager responsible for the design, construction documents, and construction services for a new 7,000 sq. ft. branch postal facility in West Dade. The structure is precast, prestressed concrete and the exterior is architectural concrete. All architecture and engineering services were provided for planning and design of public lobby areas, counters, postal boxes, parking, loading and unloading areas, sorting rooms and worker facilities. Site development included public parking, parking for postal vehicles and drive through mail depositories. (Cost: $850,000) I I I I I I I I I I I I STANDARD FORM 330 (1/2004) PAGE 2 I I I 12. NAME E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT 23 14. YEARS EXPERIENCE I b, WITH CURRENT FIRM .5 Alfredo Reyna, P.E. Civil Engineer a, TOTAL I 15, FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16, EDUCATION (DEGREE AND SPECIALIZATION) B.S.C.E., Florida International University, 1986 B.S.M.E., Florida International University, 1985 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) I P.E., Florida #44766 (1991) -Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) 19. RELEVANT PROJECTS I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FOOT District 6, Collector-Distributor (CD) Roadway, Miami PROFESSIONAL SERVICES I CONSTRUCTION (if applicable Intermodal Center, Miami, FI April 2003 I Under Construction (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm a. Project Manager responsible for the complete roadway design and plan preparation for new roadway system connecting MIA to SR-836 including electronic delivery and electronic specifications. Project also includes the design of AASHTO beam bridge structures, substructure for Hammerhead and pier type on drilled shaft foundation. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FOOT District 6, Palmetto Expressway/NW 25th Street PROFESSIONAL SERVICES I CONSTRUCTION (if applicable Interchange Reconstruction, Miami, FI 1999 12002 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm b. Project Engineer. Project involved the design and reconstruction of the interchange, the replacement of the existing bridge due to a change in profile and main line realignment. This project also included coordination of water and sewer, drainage, pavement markings, right-of-way, etc. Design also included the new retaining walls along SR-826 and the review of bridge plans. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FOOT District 6, Expansion of PalmettolDolphin Interchange (SR- PROFESSIONAL SERVICES I CONSTRUCTION (if applicable 826/ SR-836), Miami, FI 1992-1996 I N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm c. Project Engineer. Project encompassed the complete interchange reconstruction of two of Miami-Dade County's busiest urban expressways near Miami International Airport. Responsible for segmenting a new six-level interchange project into five separate construction projects. Under the guidelines for each of these projects existing number of travel lanes was maintained and specific TCP was developed. Responsibilities also included the vertical geometry composed of 72 profiles for mainline and ramp system, and modification of six signalized intersections. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FOOT District 6: Widening of SR-836 Expressway/NW 72nd PROFESSIONAL SERVICES I CONSTRUCTION (if applicable Avenue, Miami, FI December 1998 12000 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm d. Project Engineer responsible for the design for the widening of NW 72nd Avenue from four-lanes to six-lanes, adding curb and gutters. Construction plans, specifications and special provisions were prepared. The plans included milling and resurfacing, subgrade stabilization, limerock base and asphaltic concrete surface course, drainage structure adjustments, signing and pavement markings, lighting, landscaping, signalization, TCP and cost estimates. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FOOT District 6: Intersection Improvements: NW 103rd Street PROFESSIONAL SERVICES I CONSTRUCTION (if applicable and NW 87th Avenue (near Okeechobee Road), Miami, FI 2002 12004 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm e. Project Manager responsible for the preparation of plans and specifications for the engineering design of the NW 103rd Street intersection at NW 87th Avenue. The project included lane widening, milling and resurfacing, pavement markings, drainage improvements, signage, TCP, utilities, and signalization. Additionally, the project encompassed parking lot modification including a new drainage system. STANDARD FORM 330 (1/2004) PAGE 2 I I I I I I I I I I I I I I I I 12. NAME G. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13, ROLE IN THIS CONTRACT I Norma Alvarez Civil Engineer 20 14. YEARS EXPERIENCE I b, WITH CURRENT FIRM .5 a. TOTAL 15, FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS & MS, Civil Engineering, 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) I I I (1) TITLE AND LOCATION (City and State) (2lYEAR COMPLETED SR 909 WEST DIXIE HIGHWAY FROM NE 119TH ST. TO NE 151ST ST. PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable (FLORIDA DEPARTMENT OF TRANSPORTATION, DISTRICT VI) 2005 (Design) 1 Current (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm a. Roadway Engineer. Roadway construction administrative service for a roadway improvement, included the restriction of turning movements at intersections; construction of raised landscaped medians along selected locations to restrict turning movements and to improve aesthetics and sight visibility; upgrading the facility for handicap accessibility; milling and resurfacing; new signalizations including pedestrian signal features; signing and pavement marking; construction administration services. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable Miami Palmetto Senior High School Renovation, Pinecrest, Florida. Current I Current (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm b. Project Engineer. Design and plan development, permitting for court yard and athletic field drainage design with French system, for Miami Dade Public Schools. (1) TITLE AND LOCATION (City and State) 72\YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable MIAMI GARDENS ELEMENTARY SCHOOL, MIAMI, FL Current I N/A C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm Project Engineer responsible for the design and construction services of new drainage and walkway improvement design for a public school (Cost: $220,000; Design Fee: $24,000) (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if aoolicable NEEDS ASSESSMENT PROGRAM, MIAMI-DADE COUNTY, FL Current I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm d. Project Engineer responsible for the design and construction administration of local water and sewer transporting network improvements countywide. Projects under this contract include: . QN-61A - Water Main Extension Project at SW 18th Street and 127111 Avenue (Design Fee: $70,000) . UWMR-49A - Water Main Extension Project at East Dixie Highway, NE 103 Street (Cost: $796,000; Fee: $57,000) . UWMR-61A - Water Main Extension Project at SW 16th Avenue between SW 1st Street and SW Flagler Terrace STANDARD FORM 330 (1/2004) PAGE 2 I I I I I I I I I I I I I I I I 12. NAME E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT 14 YEARS EXPERIENCE a. TOTAL b, WITH CURRENT FIRM German A. Arenes Civil/Structural Engineer 10 3 15. FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) I MS, Civil Engineering 2002 I I I I I I I I I I I I I I I 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers, Associate Member; American Concrete Institute; Society of Hispanic Professional Engineers a. (1) TITLE AND LOCATION (City and State) COUNTYWIDE DRAINAGE IMPROVEMENTS (DERM), MIAMI-DADE COUNTY-VARIOUS PROJECTS 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Project Engineer/Inspector for the installation of exfiltration trenches, drainage structures and pavement resurfacing under several simultaneous emergency drainage contracts. Iicable b. (1) TITLE AND LOCATION (City and State) BRIDGE INSPECTION OF STRUCTURES OVER BAHIA HONDA (BRIDGES NO. 900016 AND 900045 DISTRICT VI 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Lead Bridge Inspector for the inspection of selected substructure elements above water level to determine the extent of deficiencies and prepare documents for the repairs of structures. Iicable (1) TITLE AND LOCATION (City and State) EMERGENCY INSPECTION OF STRUCTURES FOR MDX SYSTEM, MIAMI, FLORIDA licable 2004 c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm Performed emergency inspections of various structures damaged by the impact of high level vehicles to determine the structural damage and structural adequacy of the structures for supporting design loads. In addition, monitored repairs during construction and prepared documents recommending repairs. d. (1) TITLE AND LOCATION (City and State) NATIONAL LABORATORY OF TRANSPORTATION (MTC) PAVEMENT AND CONCRETE DEPT, MAIQUETIA'S INTERNATIONAL AIRPORT, VENEZUELA 2000 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm Project Coordinator. Coordinated and supervised the construction and placement of highways and roadways. Supervised the placement of the superficial asphalt layer of runway one, including testing of concrete cores of sub-base, pavement quality control in the field, reports on progress and daily meetings. Iicable e. (1) TITLE AND LOCATION (City and State) MTC CENTRAL OPERATIONS, HIGHWAY CONSTRUCTION, CARACAS VENEZUELA. 2000 2004 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm Field Inspector I. Inspection and field preparation for roadway construction including preliminary soil-testing, in-situ testing for bearing capacity, stabilization of sub-base for pavements, arrangement of concrete reinforcement for foundations, drainage and miscellaneous constructions. Inspection of the elaboration of pre-cast structural elements for highways, including pre-stressed concrete beams, foundations, and slabs for bridges, etc. licable STANDARD FORM 330 (1/2004) PAGE 2 I I E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13, ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Senior Environmental a. TOTAL b. WITH CURRENT FIRM ScientistlPermittin 14 8 12, NAME I Cristy Boyd I 15. FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) SA, Environmental Science, 1993/Graduate Studies in GeoiD 1994 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION lif applicable SOUTH FLORIDA MELAEUCA MAPPING PROJECT T (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm a. Research Assistant. Created a time series analysis of melaleuca invasion consisting of several thousand acres of land located south of Lake Okeechobee. Utilized color-infrared satellite imagery and transfer scopes to map native versus non-native vegetative communities. Maps were ground-truthed by helicopter. Data produced was utilized to determine methodologies to combat this invasive species. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED ENVIRONMENTAL PERMITTING AND MITIGATION FOR BAYWINDS, 600 PROFESSIONAL SERVICES I CONSTRUCTION if applicable ACRE RESIDENTIAL DEVELOPMENT I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Project Manager. The project entailed obtaining ACOE dredge and fill and the necessary state permits for wetland impacts to b. develop a site located in western Palm Beach County, Florida. Permitting involved extensive coordination with the U.S. Environmental Protection Agency and the U.S. Fish and Wildlife Service to address potential impacts to the federally threatened Everglades Snail Kite. Subsequent to issuance of permits, responsibilities included the preparation of bid documents and handling O/A meetings with potential contractors. Other responsibilities included monitoring water quality and exotic species removal and/ or herbicide treatment on the 300-acre mitigation wetland preservation area. Client: Lennar Florida Partners. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES T CONSTRUCTION (if applicable SOUTH DADE MITIGATION BANK I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm c. Environmental Specialist. Assisted in preparing the South Dade Mitigation Bank Permit Application to be submitted to the ACOE and the Florida Department of Environmental Protection. Specific documents prepared included monitoring, management, exotic species eradication plans and listed species assessments to address the Florida panther and numerous avian species indigenous to southern Florida. Also prepared a fire management plan for controlled burning. Client: Florida Power and Light. (1) TITLE AND LOCATION (City and State) 12 YEAR COMPLETED LAKEVIEW ESTATES, A 300 ACRE RESIDENTIAL DEVELOPMENT, LAKE PROFESSIONAL SERVICES I CONSTRUCTION (if applicable WORTH, FLORIDA I (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm d. Project Manager. Re-evaluated wetland mitigation plans for this project which was under enforcement action from the U,S. Army Corps of Engineers. Responsibilities included re-designing the permitted mitigation plan (in the field) to allow for unanticipated site conditions, supervision of re-contouring existing, inappropriate surface elevations, re-planting of native species and correctly re- installinQ improperly placed erosion barriers. Client: Gold Coast Homes, Inc. (1) TITLE AND LOCATION (City and State) 12l YEAR COMPLETED SANCTUARY COVE-INTRACOASTAL WATERWAY, PALM BEACH PROFESSIONAL SERVICES I CONSTRUCTiON (if applicable GARDENS, FLORIDA I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm e. Project Manager. Oversee mitigation activities for a residential development located on the Intracoastal Waterway, in Palm Beach Gardens, Florida. The project involved conducting seagrass surveys, daily turbidity and manatee monitoring, supervision of construction activities such as canal dredging, the installation of shoreline protective barriers including rip-rap and floating turbidity curtains. Additionally, Ms. Boyd supervised the installation of mangrove plantings for shoreline stabilization. Client: The Olen Company. I I I I I I I I I I I I I STANDARD FORM 330 (1/2004) PAGE 2 I I I 12. NAME E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT 33 14. YEARS EXPERIENCE I b. WITH CURRE;T FIRM I Jorge A. Canales, P.E. Senior Structural Engineer a, TOTAL 15. FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) I BS, Civil Engineering-1978 P,E., Florida #60444 (2003)-Civil Engineering I 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) National Highway Institute Certified Instructor Mr. Canales provides technical expertise in the design and plan preparation and inspection of highway structures. He has been responsible for the preliminary and final design of various highway structures. He provides in-house quality control and quality assurance in the design and plan preparation of highway structures and roadway design for state and local municipal agencies. I I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED BRIDGES OVER BAHIA HONDA (BRIDGES NO. 900016 & 900045 DISTRICT PROFESSIONAL SERVICES CONSTRUCTION (if applicable VI) 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm a. Serves as Project Manager for development of contract documents for the repairs of the structures over Bahia Honda. Responsibilities include reviewing existing plans, conducting an inspection of the structures to determine the extent of deficiencies and prepare contract documents for the repairs of both structures. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED JULIA TUTTLE CAUSEWAY OVER INTRACOASTAL WATERWAY (BRIDGE PROFESSIONAL SERVICES CONSTRUCTION (if applicable NO. 870301 DISTRICT VI) 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm b. Serves as Project Manager for development of contract documents for the repairs of the structure. Responsibilities include reviewing existing plans, conducting an inspection of the structures to determine the extent of the present deficiencies and preparing plans for the repairs of the structure. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MIAMIINTERMODAL CENTER, MIAMI, FLORIDA, FLORIDA DEPARTMENT PROFESSIONAL SERVICES CONSTRUCTION (if applicable OF TRANSPORTATION (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm c. Senior Project Engineer. Responsible for the Quality Control and Quality Assurance for the 90% and 100% design and plan preparation of bridge 7 and 10, including retaining walls. Bridge 7 consisted of two-cell steel box girders with a horizontal curved alignment and variable roadway width. Bridge 10 consisted of prestressed concrete beams with a curved alignment and skewed piers. Additionally, Mr. Canales prepared review for the 90% submittal of the structures prepared by TY Un / HJ Ross and the 100% submittal of the structures prepared by the URS Corporation for the MIC project. (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED SR 789 - KEY ROY ALE BRIDGE, MANA TEE COUNTY, FL (FL DEPARTMENT OF PROFESSIONAL SERVICES CONSTRUCTION (if applicable TRANSPORTATION, DISTRICT VI). 2004 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm d. Senior Bridge Engineer. Responsible for the design and plans preparation of contract documents for the replacement of the Key Royal Bridge consisting of a 5-span continuous concrete slab supported on concrete pile bents. Services include the removal and replacement of the existing bridge using construction staging with temporary steel sheet pile walls. Utilities and roadway coordination are also included in this project. (Cost: $475,000; Design Fee: $37,000) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 826 (PALMETTO EXPRESSWAY) AND SW 8TH STREET (TAMIAMI PROFESSIONAL SERVICES CONSTRUCTION (if applicable TRAIL) INTERCHANGE, MIAMI, FL (FL DEPARTMENT OF 2004 2008 TRANSPORTATION, DISTRICT VI). (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm e. Senior Bridge Engineer. Project consists of the design of seven bridges, one mile of noise walls and bulkheads and ten sign structures. The phase construction on the project is complex, including the maintenance of all vehicular movements. (Cost: $32 million; Design Fee: $75,000) I I I I I I I I I I I STANDARD FORM 330 (1/2004) PAGE 2 I I I 12, NAME E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT 8 14, YEARS EXPERIENCE lb. WITH CURRENT FIRM 4/2006 I Mary F. Cardenas Civil Engineer a. TOTAL 15, FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16, EDUCATION (DEGREE AND SPECIALlZA TION) BS, Civil Engineering 1998 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) I 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Cardenas has eight years of experience in design and construction inspection as well as responsibilities in other areas of the engineering field. Her field experience has included, but is not limited to construction planning, material and equipment inspection, and public safety, plus supervision to maintain safety compliance for other workers. 1 I I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable CONSTRUCTION ADMINISTRATION, BROWARD COUNTY (PRIVATE) 2006 I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm a. Construction Administrator working for local developer preparing cost estimates, cost analysis and material procurement. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable VARIOUS INSPECTIONS IN HATILLO COUNTY, CARACAS, VENEZUELA 2003 I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm b. Operations Inspector for the participation in the daily inspection of material and equipment and supervision of workers. Performed work related inspections for Hatillo County in Caracas, Venezuela. Involved in the planning of and inspection of remodeling of 12 schools. Performed visual roadway inspection, utility coordination, traffic control setup and public safety on highway construction. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable DEPARTMENT OF PUBLIC WORKS, CARACAS, VENEZUELA 2000 I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm c. Public Service Coordinator - Reviewed all construction cost estimates for Public Works, plus economical and material management resources used in the department. Participation in plans development, public services and maintenance plans. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable LA BANDERA PASSENGERS TERMINAL IN CARACAS, VENEZUELA 1999 I (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm d. Construction Inspector - Involved in the supervision of workers and daily inspection of construction materials and equipment. Participated and inspected structural reinforcement for La Bandera Passengers Terminal for four months in Caracas, Venezuela. Involved in the inspection of pre-stressed concrete wall and reinforcement tests. Her experience has included, but is not limited to, road reconstruction and daily on-site inspection for overhead signs and maintenance of traffic and public safety. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable I e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm I I I I I I I I I I STANDARD FORM 330 (1/2004) PAGE 2 1 I I I 12, NAME E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT I Ruben llizarbe, E.I. a. TOTAL Civil Engineer 6 15, FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 14. YEARS EXPERIENCE I b, WITH CURRE;T FIRM 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) 1 BS, Civil Engineering E.I. Florida #1100008662 (2003)-Civil Engineering I 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTIONOf applicable NW 62ND AVE BRIDGE OVER LITTLE RIVER, HIALEAH, FL N/A I 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm a. Project Engineer responsible for the design and detailing of the attachment of existing 12" water main across the C-7 canal, verification of field conditions, structural capacity of existing end bents and intermediate bents, and preparation of quantities. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable EAST 79TH STREET BRIDGE REHABILITATION, NORTH MIAMI, FL 2003 I 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm b. Project Engineer responsible for providing technical assistance during the review of shop drawings, and performing inspections for the rehabilitation of four 17 -span low level bridges and two bascule bridges. The rehabilitation consists of repairing pre-stressed/post- tensioned deck/slab units, pre-stressed AASHTO girders, cast-in-place bent caps, bridge fender system, painting of structural steel on bascule leaves, repair of mechanical and electrical component associated with the bascule leaves, and replacement of steel maintenance platform. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable CORAL GABLES HIGH AUDITORIUM DOME, CORAL GABLES, FL 2005 I N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm Project Engineer for the structural inspection of the cupola located along the roof of the auditorium at Coral Gables Senior High School. c. The inspection consisted of visually inspecting all structural components (roof deck, roof joists, supporting beams, framing members, etc.) associated with the structural integrity of the cupola and adjacent roof structure. The purpose of the inspection was to determine the current condition of the structure and develop repair recommendations as required to maintain safe structures. Concerns for the structural condition of the cupola originated from evidence of termite damage along some of the wood beams, joists and framing members. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if aoolicable NEVA KING COOPER EDUCATIONAL CENTER, HOMESTEAD, FL 2005 I N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm d. Project Engineer responsible for the structural inspection of eight aged buildings on this campus to determine and report on their structural integrity. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable SCOTT PARK FIELD HOUSE INSPECTIONS, MIAMI, FL 2005 I 2005 e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm Assistant Inspector responsible for field inspections and report preparation for the placement of reinforcing steel foundations, columns, and tie-beams. I I I I I I I I I I I I I I STANDARD FORM 330 (1/2004) PAGE 2 I I 12. NAME E. RESUMES OR KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one section E for each key person.) 13. ROLE IN THIS CONTRACT I Everton King a, TOTAL Structural Engineer 15. FIRM NAME AND LOCATION (City and State) Berger Avart, Inc., Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 23 14. YEARS EXPERIENCE I b. WITH CURRE;T FIRM 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) I BS, Civil Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable VENETIAN TOLL AND ADMINISTRATION BUILDING, MIAMI, FL 2003 I 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm a. Structural Engineer for the preparation of construction documents for a new toll facility and adjacent administration building, with landscaping, bike paths, and walkways. The toll plaza contains six vehicle lanes, with attendant booths and complete electronic toll collection equipment. The separate administration building provides management headquarters for all Dade County toll facilities, communication, public decal sales, and staff support facilities. (Cost: $1.5 million) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable MIA CHILLER PLANT EAST EXPANSION, MIAMI, FL 2001 I 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm b. Structural Engineer for the preparation of construction documents for approximately 100,000 square feet of additional space to expand the existing six-story, 139-foot-high central chiller plant to accommodate a new chilled capacity of 16,000 tons of refrigeration for the Miami International Airport. This required providing a 150% increase in capacity on a very restricted site, while maintaining an uninterrupted supply of chilled water. (Cost: $65 million; Design Fee: $500,000) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aoolicable FLORAL HEIGHTS ELEMENTARY SCHOOL, MIAMI, FL 1998 I 2000 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm c. Structural Engineer responsible for the contract management and construction administration services including technical reviews and quality control. This project included all engineering services for a new music, arts and media center; reconstruction of toilet facilities; new lighting throughout the facility; reconstruction/expansion of administration area; new P.E. shelter; parking improvements; irrigation/landscaping/sodding; and GACP. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION(if aPPlicable SEMINOLE ELEMENTARY SCHOOL, MIAMI, FL 1998 I 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [8] Check if project performed with current firm d. Project Engineer responsible for the preparation of program and budget to increase the capacity of the facility to conform to current education criteria and safety requirements. Prepared design development and construction documents consisting of drawings and specifications for each addition or renovated area. Other responsibilities included written reports for a weekly on-site visit to advise on progress of work and to guard the Board against defects and deficiencies of construction, punch list and supplying final review before occupancy, maintenance manuals and as-builts drawings. Also responsible for checking asbestos and other hazardous materials. This design and inspection included the provision of a complete SBS Modified Bitumen Mineral Surface roof system. (Cost: $2.3 million) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if aPo1icable BLEACHER INSPECTIONS, MIAMI-DADE & BROWARD COUNTIES, FL 2005 IN/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm e. Structural Engineer responsible for conducting a visual inspection of all stadiums and bleachers, including seats and related facilities for all school locations containing these facilities. The inspections were performed to determine if the structures were maintained in a safe condition and were free from hazards, including cracks, rust, loose fastenings, spalling, exposed reinforcing steel, wood rot, chips, splits and wood destroying insects. The inspection established that the structures met the minimum safety, casualty and sanitation requirements for their intended use. I I I I I I I I I I I I I I STANDARD FORM 330 (112004) PAGE 2 I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section f for each project.) 21. TITLE AND LOCATION (City and State) 20. EXAMPLE PROJECT KEY NUMBER I I Countywide Drainage and Canal Dredging, Miami-Dade County, FL PROFESSIONAL SERVICES 22. YEAR COMPLETED CONSTRUCTION (if applicable) 2005 2005 23. PROJECT OWNER'S INFORMATION I a, PROJECT OWNER Miami-Dade County DERM b. POINT OF CONTACT NAME Dorian Valdez, P.E. c. POINT OF CONTACT TELEPHONE NUMBER (305) 372-6886 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) I BERGER AVART was retained by the Miami-Dade County Department of Environmental Regulations Management (DERM) to provide construction management services for the repair of infrastructure damage as a result of severe flooding. The projects included placing exfiltration trenches and other drainage systems throughout Miami-Dade County to reduce flooding and related property damage from future storms. Also included in this contract were design, construction inspection and administration on several canal dredging projects throughout Miami-Dade County. (Construction Cost: $5 million) I I I I I I I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. I I I I I I AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I I I I I I I I I I I I I I I I I (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section f for each project.) 21. TITLE AND LOCATION (City and State) 20. EXAMPLE PROJECT KEY NUMBER 2 Venetian Causeway Toll Facility, Miami, FL PROFESSIONAL SERVICES 22. YEAR COMPLETED CONSTRUCTION (if applicable) 2005 2005 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami.Dade Public Works Dept. b. POINT OF CONTACT NAME Carlos Duart, P.E. c, POINT OF CONTACT TELEPHONE NUMBER (305) 375.3971 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) BERGER A VART inspected the facility and prepared estimates for refurbishment, as well as three alternatives for replacement of the current toll plaza. One of the alternatives for replacement was then selected and developed to schematic level with numerous potential aesthetic designs and landscaping schemes. Numerous meetings ensued with the Venetian Causeway Homeowner's Association and the County T ARC Committee to arrive at an acceptable design. After this was achieved, construction documents for the new toll facility and adjacent administration building with landscaping, bike paths, and walkways were prepared. The toll plaza contains six vehicle lanes with attendant booths and complete electronic toll collection equipment. The separate administration building provides management headquarters for all Dade County toll facilities, communication, public decal sales, and staff support facilities. (Cost: $1.5 million) .. .,; 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCA TJON (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION MANDA TORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I 20, EXAMPLE PROJECT KEY NUMBER I I (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comolete one Section f for each oro/ect.) 21, TITLE AND LOCATION (City and State) General Engineering Consulting Services, Miami, FL PROFESSIONAL SERVICES 3 22. YEAR COMPLETED CONSTRUCTION (if applicable) 2002 2005 I I I I I I I I I 23. PROJECT OWNER'S INFORMATION a, PROJECT OWNER Miami-Dade County DERM b. POINT OF CONTACT NAME Dorian Valdes, P.E c, POINT OF CONTACT TELEPHONE NUMBER (305) 372.6886 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. I I I I I I I 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) Through a General Engineering Consulting Professional Services Agreement (PSA) with Miami- Dade County DERM, BERGER AVART provided the design for several drainage improvements throughout Miami-Dade County. Projects completed under this PSA include: Palm Sprinqs North Phases III and IV (Sub-Basins C9W-2-8 and CL-2-1) Stormwater Utility Capital Improvements: Retrofitting the existing storm water management system by adding exfiltration trenches, replacing drainage structures and cleaning the entire piping system. Country Walk Basins 6 and 7 Drainaqe Improvement Proiect: Design of a french drain system and outfalls to alleviate the road ftooding for six miles of local roads and drainage area of 84 acres. There is a total of 13,243 LF of new french drains and two outfalls to Canal C-1 W. A section of Country Walk Drive was raised due to ftooding. Country Walk Basin 1: Design of a french drain system to improve the drainage conditions of 2.5 miles of local roadway with a drainage contributing area of 28 acres, within an existing residential zone. Project included drainage system design and drainage report with four phase submittals. There are 4,126 LF of new french drains proposed. Country Walk Basin 5: Design of a french drain system to improve the drainage conditions of 3.5 miles of local roadways with drainage contributing area of 39 acres. Project included drainage system design and drainage report with four phase submittals. There are 3,821 LF french drains proposed. (Cost: $5 million) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I , I I I I I I I I I I I I I I I I I I (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Com fete one Section ffor each ro .ect. 21. TITLE AND LOCATION (City and State) 20. EXAMPLE PROJECT KEY NUMBER 4 SR 607 I Emerson Avenue from Indrio Road to Indian River County Line, St. Lucie County, Florida PROFESSIONAL SERVICES 22, YEAR COMPLETED CONSTRUCTION (if applicable) 2004 2004 23. PROJECT OWNER'S INFORMATION a, PROJECT OWNER FL Dept. of Transportation - District 4 b, POINT OF CONTACT NAME Van ita Sharma C. POINT OF CONTACT TELEPHONE NUMBER (954) 777 .4468 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size and cost) The intent of the project was to update features to current resurfacing, restoration and rehabilitation criteria. This included widening of the existing two-foot paved shoulders to five feet, milling and resurfacing of the existing driving lanes, and replacing existing cross drains. The Fort Pierce Water Control District Canal runs parallel to the north Right of Way Line of Emerson Avenue. The project also included improvements to the slopes of the Canal in those areas showing signs of erosion. Thorough communications and meetings with FPWCD were undertaken to develop an erosion protection system that was acceptable to both the client and the canal owners. (Construction Cost: $1.55 million; Construction Cost Estimate: $1.40 million; Design Fee: $430,000) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) II I I 20. EXAMPLE PROJECT KEY NUMBER (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Com fete one Section ffor each ro 'ect. 21. TITLE AND LOCATION (City and State) 5 22, YEAR COMPLETED CONSTRUCTION (if applicable) PROFESSIONAL SERVICES Krome Avenue and SW 8th Street Intersection Improvements, Miami, FL 2004 2004 23. PROJECT OWNER'S INFORMATION I I C. POINT OF CONTACT TELEPHONE NUMBER b. POINT OF CONTACT NAME Adrianna Manzanares a. PROJECT OWNER FL Dept. of Transportation - District 6 (305) 470-5283 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) SR 997, a rural principal arterial, is considered a main north-south artery with heavy truck traffic, and SR 90 is a principal arterial in the east-west direction of Miami-Dade County. The existing bridge at Canal C-4, just north of the intersection of SR 997 and SR 90, needed to be replaced by a wider bridge to accommodate full width of the roadway shoulders and exclusive left and right turn lanes. These turning lanes will improve traffic movement and reduce the accident rate at the Krome Avenue and SW 8th Street intersection. Reconstruction of the existing roadways included approximately Y2-mile of work along Krome Avenue and :t 0.3 mile of work along SR 90. A complete drainage analysis and improvements were included because the bridge and road reconstruction will add slightly over two acres of impervious areas to the site. A retaining wall was added along the north side of SR 90 since Canal C-4 runs parallel to the existing road. (Cost $4.8 million; Design Fee: $400,000) I I I ~ I I I I I I I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. I I I I AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I I I I I I I I I I I I I I I I I (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Com Jete one Section ffor each ro 'ect. 21. TITLE AND LOCATION (City and State) 20. EXAMPLE PROJECT KEY NUMBER 6 West Dixie Highway from NE 1191h Street to NE 15151 Street, North Miami, Florida PROFESSIONAL SERVICES 22. YEAR COMPLETED CONSTRUCTION (if applicable) 2004 06/2007 23. PROJECT OWNER'S INFORMATION a, PROJECT OWNER FL Dept. of Transportation - District 6 b. POINT OF CONTACT NAME Adrianna Manzanares c. POINT OF CONTACT TELEPHONE NUMBER (305) 470-5283 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) BERGER AVART was contracted by the Florida Department of Transportation to provide the design for improvements to West Dixie Highway from NE 119th Street to 1515t Street in North Miami. The project design included the restriction of turning movements at selected intersections; construction of raised landscaped medians along selected locations to restrict turning movements and to improve aesthetics; improvement of sight visibility; removal of perpendicular storefront parking along SR 909; elimination of unnecessary curb cuts and driveways; upgrading the facility for handicap accessibility; milling and resurfacing; signing and pavement markings; and upgrading pedestrian signal features and street signals. (Design Fee: $236,000; Construction Cost $4,900,000; Construction Cost Estimate $4,300,000) l__ - [ --~ ~~":""'" ,~--- -- 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. ComDlete one Section f for each Droiect. ) 21. TITLE AND LOCATION (City and State) 20, EXAMPLE PROJECT KEY NUMBER I 7 I SW 87th Avenue and 72nd Street Intersection Safety Improvements, Miami, Florida PROFESSIONAL SERVICES 22. YEAR COMPLETED CONSTRUCTION (if applicable) 2004 2004 23. PROJECT OWNER'S INFORMATION I a, PROJECT OWNER FL Dept. of Transportation - District 6 b. POINT OF CONTACT NAME Adrianna Manzanares c. POINT OF CONTACT TELEPHONE NUMBER (305) 470-5283 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) I BERGER AVART provided the design for this RRR improvement of a major intersection, including roadway widening to provide an auxiliary lane and taper. Drainage improvements included a new french drain system, new traffic separator, sidewalk, curb and gutter. Curb cut ramps were proposed. A new mast arm system replaced the existing strain pole signalization system and provided relocation of light poles due to widening. (Design Fee: $137,000; Construction Cost: $719,000; Construction Cost Estimate: $817,000) I I I ._.~ ......;...- I I I ""., " '- - ~-- I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I I (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. I I I I I AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section (for each project.) 21 TITLE AND LOCATION (City and State) 20, EXAMPLE PROJECT KEY NUMBER 8 US 1 at SW 67th Avenue (Ludlam Road) Intersection Safety Improvements, Miami, Florida PROFESSIONAL SERVICES 22, YEAR COMPLETED CONSTRUCTION (if applicable) 2004 2004 23. PROJECT OWNER'S INFORMATION I I a. PROJECT OWNER FL Dept. of Transportation - District 6 b, POINT OF CONTACT NAME Adrianna Manzanares c, POINT OF CONTACT TELEPHONE NUMBER (305) 470-5283 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) I I BERGER AVART provided the design for this major intersection, including an easUwest projected only signal phase, addition of a second westbound thru lane, optimization of the signal timing and reassignment of the eastbound approach lane configuration. ADA ramps to cross 67th Avenue were also placed along the east side of US 1 at the intersection. A modification to the southbound lane on SW 67th Avenue was required to properly channelize traffic heading north. A light fixture on a strain pole located at the southwest corner of the intersection was replaced with a new light pole since the existing strain poles were being replaced. Minor drainage improvements/modifications were also necessary at the intersection. The design required installation of a single span truss or mast arms to accommodate the traffic signals at this intersection. (Construction Cost $800,000; Construction Cost Estimates: $730,000; Design Fee: $127,000) I I I " I I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I I (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. I I I I I AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) II I I I II I I I I I I I I I I I I I I I (3) EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section (for each project.) 21. TITLE AND LOCATION (City and State) 20. EXAMPLE PROJECT KEY NUMBER 9 SR 985 (SW 107th Avenue) from Kendall Drive to Miller Road, Miami, Florida PROFESSIONAL SERVICES 22. YEAR COMPLETED CONSTRUCTION (if applicable) 2003 2003 23. PROJECT OWNER'S INFORMATION a, PROJECT OWNER FL Dept. of Transportation - District 6 b. POINT OF CONTACT NAME David Mendez, P.E. C. POINT OF CONTACT TELEPHONE NUMBER (305) 470-5207 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) This RRR project consisted of improvement of the riding surface of a four-lane divided paved roadway at SR 985 (SW 107th Avenue) from SR 94 (SW 88th Street/Kendall Drive) to SW 56th Street (Miller Drive), Three major intersections within the project limits were improved as follows: · At SR 94 (Kendall Drive) the addition of dual left turn lanes in the east/west directions will increase the left turn capacity and will reduce the risk of left turn crashes due to the protected "one only phase signal", The existing five-section signal head was replaced with two three-section signal heads in the east/west directions. · At SR 986 crashes will be reduced by offsetting the east/west left turn lanes by eight feet and closing the opening in the east bound left turn.~ lane. This required widening of the intersection. As a result of the 1P '" ,.~ widening, milling and resurfacing of the intersection, upgrading the traffic signal equipment, relocating light poles and four drainage inlets were required. · Miller Drive: Improvements to safety and operational conditions was accomplished by reducing the east/west approach median widths; increasing the left turn lane storage length; optimizing the green splits; moving the southbound stop-bar toward the intersection; and adding street lights on the northwest corner and southeast corner of the intersection. (Cost: $2.1 million) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I I I I I I I I I I I I I I I I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section f for each Droiect. ) 21. TITLE AND LOCATION (City and State) 20, EXAMPLE PROJECT KEY NUMBER 10 SR 5 (US 1) and Coral Way Intersection Improvements, Miami, Florida PROFESSIONAL SERVICES 22. YEAR COMPLETED CONSTRUCTION (if applicable) 2003 2003 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME Adrianna Manzanares C. POINT OF CONTACT TELEPHONE NUMBER FL Dept. of Transportation - District 6 (305) 470-5283 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) In order to improve the operational problems of the intersection of SR 5 (US 1/Brickell Ave.) at SR 972 (Coral Way/SE 13th St.), widening the east approach receiving lane to align the eastbound through movement along SE 12th Terrace was required. The existing easement on the south side of SW 12th Terrace was approximately 5' off the edge of existing curb and gutter at the edge of pavement. FOOT needed to acquire additional ROW in order to widen the east approach. Milling and resurfacing of SE 13th Street and SE 12th Terrace west and east of Brickell Avenue was performed. New curb cuts were provided at all four corners of the Brickell Avenue intersection to comply with current ADA requirements. Safety improvements included the relocation of existing hydrants and street lights to the back of existing sidewalks. Other improvements included the replacement of portions of concrete curb and gutters and a portion of the concrete roadway (approx. 65 sy) along Brickell Avenue. (Cost: $1.5 million; Design Fee: $250,000) · I.... f I" A -!'J \ - --- '" .lr_... ". ...... .... i" _ 11 ...~-'" 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. BERGER AVART, Inc. Miami, Florida Prime Consultant (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I II G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF KEY 27. ROLE IN THIS CONTRACT (Fill in "Example Projects Key" section below before completing PERSONNEL (From Section E, Block 13) table. Place "X" under project key number for participation in (From Section E, Block 12) same or similar role.) 1 2 3 4 5 6 7 8 9 10 Un U, P.E. Civil Engineer/Permitting X X X X X X X X Luis Olivares, P.E. Principal-in-Charge and QA/QC X X Arthur J. Miller, P.E. Constructability-Bidability Review X X Alfredo Reyna Project Manager X German A. Arenes Civil Engineer X X Norma Alvarez Civil Engineer X Ruben Ilizarbe, E.I. Civil Engineer X Mary F. Cardenas Civil Engineer X Jorge A. Canales, P.E. Structural Engineer X X Everton King Structural Engineer X X X Cristy Boyd Environmental Scientist/Permitting Alfredo Reyna Project Manager X NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Countywide Drainage and Canal Dredging, Miami-Dade 6 West Dixie Highway from NW 119th Street to NW 151st Street, County, FL North Miami, Florida 2 Venetian Causeway Toll Facility, Miami, FL 7 SW 87th Avenue and 72nd Street Intersection Safety Improvements, Miami, Florida 3 General Engineering Consulting Services, Miami, FL 8 US 1 at SW 67th Avenue (Ludlam Road) Intersection Safety Improvements, Miami, Florida SR 607 I Emerson Avenue from Indrio Road to Indian River SR 985 (SW 107th Avenue) from Kendall Drive to Miller Road, 4 County Line, St. Lucie County, Florida 9 Miami, Florida Krome Avenue and SW 8th Street Intersection SR 5 (US 1) and Coral Way Intersection Improvements, 5 Improvements, Miami, FL 10 Miami, Florida I I 1 I II I I I I I I I I I I I AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I I 1 I I 1 I I I I I I I I I I I H. ADDITIONAL INFORMATION 29. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED: BERGER AVART, Inc. is pleased to present its qualifications to provide professional services to the City of Sunny Isles Beach for the Collins Avenue Streetscape Project. Headquartered in Miami, Florida, BERGER AVART is a consulting engineering firm that has been serving clients in South Florida for over 25 years. We are a subsidiary of the Louis Berger Group, one of the largest engineering, economic and environmental planning organizations in the United States. Since BERGER A V ART's incorporation in 1981, we have been serving the needs of a broad client base that includes Broward County Public Schools, various Departments in Miami-Dade County (Water and Sewer, Environmental Resource Management, Public Works, Aviation, and Parks and Recreation, to name a few), the City of Sunny Isles Beach, the City of Coral Gables, the Florida Department of Transportation, Miami-Dade County Public Schools, and other public and private clients. Our multidisciplinary staff of professional engineers and certified technicians is immediately available to respond to the needs of the City of Sunny Isles Beach for this important project. With its experienced and talented staff, BERGER AVART can assure the City of a timely and cost effective solution for each assigned task. We have a proven track record on a multitude of similar projects. Our approach outlined below deals with BERGER AVART's management approach to similar general engineering agreements. Our methods are flexible enough to meet the specific needs of the City. Our foremost priority is to provide maximum support services to the City with minimal supervision. Project Understanding/Similar Project Experience BERGER A V ART has provided engineering services on many similar general consulting engineering contracts. For example, we are currently providing General Engineering Services to the City of Miami Beach, the School Board of Broward County (SBBC), Miami-Dade County Public Schools (MDCPS), and FOOT District VI. We know that a major element for success is a clearly defined scope of services for each assignment. Our first priority will be to ensure that responsibilities are clearly defined and understood, and that requirements, standards, procedures, and constraints are clearly identified. We routinely assist the City of Miami Beach and FOOT District VI in the formulation of the scope definition to ensure a mutual understanding. We also establish project schedules with milestone dates to ensure timely completion of each required project element. This valuable project experience will help us to better serve the City of Sunny Isles Beach's needs. Similar assignments are listed below: · Park Buildings 40 Certification (City of Sunny Isles Beach) · Roof Top Equipment Hurricane Protection Design for Various Schools (SBBC) · Enhanced Hurricane Protection Area Inspection and Certification for Various Schools (SBBC) · Site Drainage, Irrigation Design, Lakeview Elementary School (MDCPS) · Site Building Renovation, Parking Lot Improvements, Teacher's Access Center "' (MDCPS) AUTHORIZED FOR LOCAL REPRODUCTION MANDA TORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I I I I I I I I I I I I I I I I I . Bleacher Inspection and Certification, Various Schools (MDCPS) . Seminole Elementary School New Building Expansion (Structural) and Site Improvement (Civil) Design and Construction Administration (MDCPS) . South Miami Heights Elementary School Playfield Improvements Design (MDCPS) . Roadway Widening and Intersection Improvement at SW 87th Ave. and SW 72nd Ave. (FDOT VI) . Roadway Intersection Improvement Design at US 1 and SW 67th Ave. (FDOT VI) . West Dixie Highway Roadway, Pavement Marking and Signalization Design (FDOT VI) Proposed Staff Our proposed Project Manager, Un U, P .E., has over 15 years of relevant experience in civil and transportation projects. Mr. Li will lead BERGER AVART's efforts on this project and will be the primary contact for the City's Project Manager. Mr. Li has experience in the planning, design and coordination/management of major highway projects, including roadway and bridge geometry, traffic, drainage, water and sanitary sewer projects. Luis Olivares, P.E., as Principal-in-Charge and QA/QC officer, will provide support to Mr. Reyna and the entire Team and will lead the QA/QC effort. Project Start Up When the City assigns a project to BERGER AVART, Mr. Li will meet with the City's Project Manager to discuss the details of the services to be provided. The level of project complexity, information to be collected, project requirements and number of phase reviews will be determined. Once an understanding has been reached on the scope of services, BERGER AVART will then submit a staff-hour estimate, proposed fee, and preliminary schedule for the completion of the project assignment. Project Requirements and Data Collection BERGER AVART will submit a final project schedule to the City's Project Manager within days of receiving a notice to proceed. This schedule will be routinely updated to reflect all progress and any changes. A schedule will be produced monthly or as directed by the City's Project Manager. BERGER AVART will immediately begin to collect from the City all available existing information (as-builts, surveys, geotechnical information, traffic investigations and any preliminary analysis). Each assignment will be closely analyzed and an early site visit will be performed to identify areas of concern according to the project scope. Photographs of the projects will be filed for later use as required during the design process. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I I I I I I I I I I I I I I I I I Innovation BERGER AVART utilizes the latest technology in design and plans preparation, which allows us to expedite our design efforts through completion. Our in-house computer design programs are routinely applied. All deliverables are provided in AutoCAD format. Our staff is thoroughly familiar with the latest design criteria and guidelines to ensure compliance with required standards. Quality Control and Assurance BERGER A V ART's policy is to produce quality plans, specifications and estimates for all projects. Quality control is an on-going operational aspect of the total work effort and is built into BERGER AVART's design process. BERGER AVART's Principal-in-Charge, Luis A. Olivares, P.E., and the Team's engineers directly control this function. Quality assurance will be the responsibility of the Team's reviewing engineers and BERGER AVART's Quality Assurance Engineer, Arthur Miller, P.E. In accordance with our operating procedures, Mr. Miller will review every task after sign-off by the Project Manager to ensure that the required quality and conformance to City criteria is achieved. BERGER AVART has a comprehensive and rigid quality assurance plan. Checking, back checking and re- checking is established in our Policies and Procedures Manual. Internal checklists are used to assist in document reviews and ensure the completeness of the contract plans before they reach the client and/or respective parties involved. These checklists are used on all our projects and are modified accordingly for specific projects. This procedure is adhered to during each plan phase. Summary BERGER AVART has a proven track record of timely response and ahead of schedule deliveries. We offer the City of Sunny Isles Beach a talented team of professionals with outstanding credentials that is committed to completing each assignment successfully and efficiently. We appreciate this opportunity to present our qualifications and look forward to providing high quality engineering services to the City of Sunny Isles Beach. I. AUTHORIZED REPRESENTATIVE The foreqoinq is a statement of facts. 30. SIGNATURE OF AUTHORIZED REPRESENTATIVE T 31. DATE SIGNED: September 12, 2007 32. NAME AND TITLE OF SIGNER: Luis A. Olivares, P.E., President AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) I I I I I I I I I I I I I I I I I I I Berger Avort RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape r'~ ,~ n R ~~ } R A r > L SAVINO & MILLER DESIGN STUDIO I I ARCHITECT - ENGINEER QUALIFICATIONS PART 1- CONTRACT-SPECIFIC QUALIFICATIONS II I A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State). PUBLIC NOTICE DATE: 2. 3. SOLICITATION OR PROJECT NUMBER: I B. ARCHITECT-ENGINEER POINT OF CONTACT NAME AND TITLE: , I I 4. 5. NAME OF FIRM: 6. TLEPHONE NUMBER: 7. FAX NUMBER: 8. E-MAIL ADDRESS: C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) I I I I 9a. PRIME (CHECK HERE): JOINT-VENTURE PARTNER (CHECK HERE): SUBCONTRACTOR (CHECK HERE): ./ 9a. 9a. 9a. FIRM NAME: Savino & Miller Design Studio 9a. IF BRANCH OFFICE CHECK HERE: 10a. ADDRESS: 12345 N.E. 6th Avenue, North Miami, Florida 33161 11a. ROLE IN THIS CONTRACT: Local Landscape Architecture: Planting Plan, Irrigation & Installation and Maintenance Specifications, and Construction Documents I I I 9b. PRIME (CHECK HERE): 9b. JOINT-VENTURE PARTNER (CHECK HERE): 9b. SUBCONTRACTOR (CHECK HERE): 9b. FIRM NAME: 9b. IF BRANCH OFFICE CHECK HERE: 10b. ADDRESS: 11 b. ROLE IN THIS CONTRACT: 9c. PRIME (CHECK HERE): 9c. JOINT-VENTURE PARTNER (CHECK HERE): 9c. SUBCONTRACTOR (CHECK HERE): 9c. FIRM NAME: 9c. IF BRANCH OFFICE CHECK HERE: 10c. ADDRESS 11c. ROLE IN THIS CONTRACT: I I I I I STANDARD FORM 330 (6/2004) PAGE 1 I I I I I I I I I I I I I I I I I I I 9d. PRIME (CHECK HERE): 9d. JOINT-VENTURE PARTNER (CHECK HERE): 9d. SUBCONTRACTOR (CHECK HERE): 9d. FIRM NAME: 9d. IF BRANCH OFFICE CHECK HERE: 10d. ADDRESS: 11d. ROLE IN THIS CONTRACT: ge. PRIME (CHECK HERE): ge. JOINT-VENTURE PARTNER (CHECK HERE): ge. SUBCONTRACTOR (CHECK HERE): ge. FIRM NAME: ge. IF BRANCH OFFICE CHECK HERE: 10e. ADDRESS: 11e. ROLE IN THIS CONTRACT: 9f. PRIME (CHECK HERE): 9f. JOINT-VENTURE PARTNER (CHECK HERE): 9f. SUBCONTRACTOR (CHECK HERE): 9f. FIRM NAME: 9f. IF BRANCH OFFICE CHECK HERE: 1 Of. ADDRESS: 11f. ROLE IN THIS CONTRACT: 9f. PRIME (CHECK HERE): 9f. JOINT-VENTURE PARTNER (CHECK HERE): 9f. SUBCONTRACTOR (CHECK HERE): 9f. FIRM NAME: 9f. IF BRANCH OFFICE CHECK HERE: 1 Of. ADDRESS: 11f. ROLE IN THIS CONTRACT: D. ORGANIZATIONAL CHART OF PROPOSED TEAM 0 (attached) STANDARD FORM 330 (6/2004) PAGE 2 I I I I I I I I I I I I I I I I I I I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Barry R. Miller ROLE IN THIS CONTRACT: Partner in Charge 13. 14a. YEARS EXPERIENCE - TOTAL: 27 14b. YEARS EXPERIENCE - WITH CURRENT FIRM: 14 15. FIRM NAME AND LOCATION (City and State): Savino & Miller Design Studio, 12345 N.E. 6th Avenue, A North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION): Bachelor of Landscape Architecture, Master of Arts in Urban & Regional Planning 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE): FL LA 866 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): American Society of Landscape Architects Merit Award American Institute of Architectural Landscape - Architect of the Year Award American Society of Landscape Architect Miami Chapter - past President University of Miami Campus Plan Competition Grand Prize 19. RELEVANT PROJECTS 19a(1) TITLE AND LOCATION (City and State): South Point Park, Miami Beach, Florida 19a(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19a(2) YEAR COMPLETED - CONSTRUCTION (If applicable).' 2007 19a(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Site Analysis, Schematic Design, Design Development & Construction Documents including mitigation and transplanting plan of the Planting Plan and Irrigation of a 19-acre park located in the southern tip of Miami Beach at the entrance of Government Cut. The park was designed by Hargreaves & Associates. Cost: $20 Million Partner in Charge 19a(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 19b(1) TITLE AND LOCATION (City and State): Homestead Bayfront Park, Homestead, Florida 19b(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19b(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 19b(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Master Planning for a 23-acre park located in Homestead, Florida. Scope included the re-design of the access to the park, the organization of the parking and circulation, tapping new opportunities for recreation activities and re-organizing existing activities. Homestead Bayfront Park is one of the five Miami-Dade County Heritage parks. The design calls for sustainable design solutions and restoration of green space into a biodiverse ecological habitat. Estimated Cost: $18 Million 19a(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 19c(1) TITLE AND LOCATION (City and State): Belle Isle Park, Miami Beach Belle Isle, Venetian Islands, Miami Beach, Florida 19c(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2002 19c(2) YEAR COMPLETED - CONSTRUCTION (If applicable): Under construction 19c(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Schematics through Construction Administration of a 2-acre park in Miami Beach. Belle Isle is the "Central Park" to Belle Isle. It is surrounded by high rise condominiums. It also acts as the gateway to the Venetian Islands from Miami Beach. Belle Isle Park, located on the only natural island of the Venetian Islands between Miami and Miami Beach, is a major open space surrounded on three sides by high-density condominium buildings, and Venetian Causeway to the north. The space offered no walkways or large open spaces for play, but was mostly used by residents to walk the dogs. SMDS was asked to create a plan to attract more residents to use the park, and responded with a plan which provided for a range of recreational opportunities. A large elliptical open space formed by a walkway, coupled with a "Bark Park" and numerous small paved seating areas - located by each of the park entry/street crosswalks - allows for both passive and active play activities. Numerous existing trees and palms were preserved or transplanted to create and define the park's spaces. Cost: $450,000 19c(3) BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 3 I I I I I I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Adriana Savino-Miller 13. ROLE IN THIS CONTRACT: Project Designer, Quality Control 14a. YEARS EXPERIENCE - TOTAL: 22 14b. YEARS EXPERIENCE - WITH CURRENT FIRM: 14 15. FIRM NAME AND LOCATION (City and State): Savino & Miller Design Studio, 12345 N.E. 6th Avenue, A, North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TlON): Architecture, Master of Architecture, Certificate of Urban Design 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE). FL AR 14444 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc): University of Miami Campus Plan Competition Grand Prize American Institute of Architect-Landscape Architect of the Year Award 19. RELEVANT PROJECTS I 19a(1) TITLE AND LOCATION (City and State): Miami-Dade Metro Zoo Master Plan, Miami-Dade, Florida 19a(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2004 I I I I I I I I I I I I 19a(2) YEAR COMPLETED - CONSTRUCTION (If applicable).' on going 19a(3) BRIEF DESCRIPTION (Brief scope, size, cost etc) AND SPECIFIC ROLE: As the Landscape Architect and Master Planner for the Metro Zoo/Richmond Naval Air Station Master Plan, SMDS performed an extensive site analysis of the entire four square mile project area, including all environmental components (geology, hydrology, vegetation, soils, etc.) historical development patterns and context, land use, ownership, and analysis of the existing zoo facilities. The analysis led to the creation of overlay maps indicating opportunities and constraints to future zoo/theme park expansion. The final Master Plan proposes the location of a new hotel, amusement park, aquatic center, and family entertainment facilities. 19a(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 19b(1) TITLE AND LOCATION (City and State): Homestead Bayfront Park, Homestead, Florida 19b(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19b(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 19b(3) BRIEF DESCRIPTION (Brief scope, size, cost etc) AND SPECIFIC ROLE: Master Planning for a 23-acre park located in Homestead, Florida. Scope included the re-design of the access to the park, the organization of the parking and circulation, tapping new opportunities for recreation activities and re-organizing existing activities. Homestead Bayfront Park is one of the five Miami-Dade County Heritage parks. The design calls for sustainable design solutions and restoration of green space into a biodiverse ecological habitat. Partner in Charge Estimated Cost: $18 Million 19b(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 19c(1) TITLE AND LOCATION (City and State): Belle Isle Park, Miami Beach Belle Isle, Venetian Islands, Miami Beach, Florida 19c(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2002 19c(2) YEAR COMPLETED - CONSTRUCTION (If applicable): Under construction 19c(3) BRIEF DESCRIPTION (Brief scope, size, cost etc) AND SPECIFIC ROLE: Schematics through Construction Administration of a 2-acre park in Miami Beach. Belle Isle is the "Central Park" to Belle Isle. It is surrounded by high rise condominiums. It also acts as the gateway to the Venetian Islands from Miami Beach. Belle Isle Park, located on the only natural island of the Venetian Islands between Miami and Miami Beach, is a major open space surrounded on three sides by high-density condominium buildings, and Venetian Causeway to the north. The space offered no walkways or large open spaces for play, but was mostly used by residents to walk the dogs. SMDS was asked to create a plan to attract more residents to use the park, and responded with a plan which provided for a range of recreational opportunities. A large elliptical open space formed by a walkway, coupled with a "Bark Park" and numerous small paved seating areas - located by each of the park entry/street crosswalks - allows for both passive and active play activities. Numerous existing trees and palms were preserved or transplanted to create and define the park's spaces. Cost: $450,000 19c(3) BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 4 I I I I I I I I I I I I I I I I I I I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Talita Gutierres 13. ROLE IN THIS CONTRACT: Landscape Architectural DesignerlDrafting 14a. YEARS EXPERIENCE - TOTAL: 9.5 14b. YEARS EXPERIENCE - WITH CURRENT FIRM: 1.5 15. FIRM NAME AND LOCATION (City and State): Savino & Miller Design Studio, 12345 N.E. 6th Avenue, A, North Miami, Florida EDUCATION (DEGREE AND SPECIALIZATION): Architecture, Urbanism, & /Landscape Architecture, Universidad MacKenzie, Sao Paolo, Brazil 16. 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)' N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Fia Flora Exhibition Landscape Architecture Award 2004: Jardim do Fogo 19. RELEVANT PROJECTS 19a(1) TITLE AND LOCATION (City and State): South Point Park, Miami Beach, Florida 19a(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19a(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 19a(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Site Analysis, Schematic Design, Design Development & Construction Documents including mitigation and transplanting plan of the Planting Plan and Irrigation of a 19-acre park located in the southern tip of Miami Beach at the entrance of Government Cut. The park was designed by Hargreaves & Associates. Cost: $20 Million Partner in Charge 19a(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 19b(1) TITLE AND LOCATION (City and State): The Ritz Hotel, Miami Beach, Florida 19b(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19b(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 2008 19b(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The Master Plan composes the program elements of Hotel, Time Share Villas, Clubhouse, and Men's Club into a comprehensive open space system, allowing continuous circulation through landscaped courtyards, pool decks, and palm meadows. SMDS provided complete Master Plan services and design development for the open space system, including the site mater planning, vehicular circulation and parking, pedestrian walks, pools, pool decks, and garden spaces. A detail of typical villas "cluster" illustrates the design intent to respect traditional/cultural forms and customs. From Schematics through Construction Documents. 19b(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 19c(1) TITLE AND LOCATION (City and State)' Miami Beach Jewish Community Center (JCC), Miami Beach, Florida 19c(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19c(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 19c(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The JCC campus design responds to the center's desire to provide a diverse program of outdoor activities. The various courtyards, water features, and fields throughout the project allows for study, socializing and play throughout the campus at the same time. SMDS designs for the landscape reflect the architecture's contemporary style, with emphasis on simplicity, attention to detail and creating an enhanced indoor to outdoor spatial relationship. Master Plan, Schematic Design Plans, Design Development, Construction Documents. Project Manager. 19c(3) BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 5 I I I I 1 I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Emily Hamilton ROLE IN THIS CONTRACT: Landscape Architectural DesignerlDrafting 13. 14a. YEARS EXPERIENCE - TOTAL: 1.5 14b. YEARS EXPERIENCE - WITH CURRENT FIRM: 1 15. FIRM NAME AND LOCATION (City and State): Savino & Miller Design Studio, 12345 N.E. 6th Avenue, A, North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION): B.S. Plant Design, Cornell University 2002 Master of Landscape Architecture, University of Illinois, Urbana Champaign 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE): N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc): 19. RELEVANT PROJECTS 19a(1) TITLE AND LOCATION (City and State): 19a(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 19a(2) YEAR COMPLETED - CONSTRUCTION (If applicable): I 19a(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: 19a(3) BRIEF DESCRIPTION - Check here if project performed with current firm: I 1 I I 1 I I I 1 1 I I 19b(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): 19b(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 19b(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: 19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: 19c(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): 19c(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 19c(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: 19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 6 I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALlFICA TIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) I 20. EXAMPLE PROJECT KEY NUMBER: 1 I !. 21. TITLE AND LOCATION (City and State): Miami Beach Golf Course Streetscape Improvements, Miami Beach, Florida YEAR COMPLETED - PROFESSIONAL SERVICES: 2000 22a. 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 2002 23. PROJECT OWNER'S INFORMATION I 238. PROJECT OWNER: City of Miami Beach 23b. POINT OF CONTACT NAME: John Olden berg I 23c. POINT OF CONTACT TELEPHONE NUMBER: 305673-7730 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): The Miami Beach Golf Course Streetscape Project is designed to recapture the tropical splendor that graced the streetscape in the 1930's-1960's. The design "borrows" existing golf course vegetation to create a vibrant display of colors and textures for passersby. Seasonal colors and flowers dominate the streetscape along Alton Road, a major vehicular artery, while native groundcovers, shrubs and palms are used along the residential corridor of the project. I I Services: Schematics through Construction Phase Services. Project Cost: $400,000 I I I I I I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Local Landscape Architects Ken Di Donato Fort Lauderdale, Florida Irrigation Consultant I I I I STANDARD FORM 330 (6/2004) PAGE 7 I I I I II I I I 1 I I I I I I I 1 I I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 2 21. TITLE AND LOCATION (City and State): Sunny Isles City Hall, Sunny Isles, Florida 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 2004 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 2005 23. PROJECT OWNER'S INFORMATION 23a. PROJECT OWNER: City of Sunny Isles Beach 23b. POINT OF CONTACT NAME: Jorge Vera 23c. POINT OF CONTACT TELEPHONE NUMBER: 305947-0606 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost). Our open space design concept integrates the City Hall site and adjacent restaurant into a cohesive urban setting. A large fountain embraces the council chambers, providing a continuous seating area for passerby and employees alike, terminating at a small courtyard adjacent to the library. The plaza was designed to expand north as part of a future City Hall expansion project. The interplay of the shimmering water and lights on the blue mosaic wall creates a civic nighttime display. Services: Site Master Plan, Schematic Design through Construction Phase Services for Planting, Paving, Site Lighting, Irrigation, and Fountain Design. Project Cost: $750,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Local Landscape Architects Hall Fountain Fort Lauderdale, Florida Fountain Design STANDARD FORM 330 (6/2004) PAGE 8 I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) I 20. EXAMPLE PROJECT KEY NUMBER: 3 21. TITLE AND LOCATION (City and State): Espanola Way Streetscape Improvements, Miami Beach, Florida 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 2000 I 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 2002 23. PROJECT OWNER'S INFORMATION I 23a. PROJECT OWNER: City of Miami Beach 23b. POINT OF CONTACT NAME: John De Pazos (City of Miami) I 23c. POINT OF CONTACT TELEPHONE NUMBER: 305416-1280 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): I The design program was to develop a street plaza which reflected the surrounding historic village located on Espanola Way in Miami Beach. A continuous plaza, designed without curbs, is designed to encourage street festivals and daily social interaction. A future fountain is planned for the center of the plaza. Our design services included decorative paving, site lighting, site furniture, and planting. I Services: Master Planning, Schematic Design through Construction Phase Services. Project Cost: $400,000 I I I I I I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1) FIRM NAME Savino & Miller Design Studio (2) FIRM LOCATION (City and State) North Miami, Florida (3) ROLE Prime Landscape Architects I I I I STANDARD FORM 330 (6/2004) PAGE 9 I I I I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 4 TITLE AND LOCATION (City and State): Homestead Bayfront Park, Homestead, Florida 21. 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): NIA 23. PROJECT OWNER'S INFORMATION I I I I I I I I I I 23a. PROJECT OWNER: Miami-Dade County Parks & Recreation I Peebles Atlantic Development, Inc. 23b. POINT OF CONTACT NAME: Mark Heinicke 23c. POINT OF CONTACT TELEPHONE NUMBER: 305755-7811 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): 24. The Homestead Bayfront Park Master Plan is a comprehensive Master Plan for the renovation of Homestead Bayfront Park, one of five designated Heritage Parks in Miami-Dade County, calling for sustainable design solutions and restoration of greens pace into a biodiverse ecological habitat. Services: Site Master Planning, Schematic Design. Project Cost: $18 Million J ~. - ... ........ 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I I I I I (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects STANDARD FORM 330 (6/2004) PAGE 10 I. I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) I 20. EXAMPLE PROJECT KEY NUMBER: 5 21. TITLE AND LOCATION (City and State): Washington Avenue Streetscape Master Plan 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: I 22b. YEAR COMPLETED - CONSTRUCTION (If applicable)' 23. PROJECT OWNER'S INFORMATION I 23a. PROJECT OWNER: Miami Beach Public Works Department 23b. POINT OF CONTACT NAME: John De Pazos I 23c. POINT OF CONTACT TELEPHONE NUMBER: 305 673-7080 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): I A streetscape beautification project in the heart of the Miami Beach Art Deco District. The design and construction process for this project, presently ongoing, includes an exhaustive community consensus-building process, historical analysis, site analysis, development of Opportunity/Constraint maps, Alternative Design & Phasing Plans, Final Design/Cost Estimate Plan, and Construction Documents/Administration. I Services: Master Plan, Schematic Design Plans, Design Development, Construction Documents and Construction Phase Services. Project Cost: $3,300,000 I ~ -. , '_ ~ . -:.6' , ... ~' ,.-..- ".,' ..J I I I I I I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects I I STANDARD FORM 330 (6/2004) PAGE 11 I I II I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 6 TITLE AND LOCATION (City and State): Brickell Avenue Median Improvements 21. 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 22b. YEAR COMPLETED - CONSTRUCTION (If applicable).' 1996 23a. PROJECT OWNER: Downtown Development Authority 23. PROJECT OWNER'S INFORMATION 23b. POINT OF CONTACT NAME: Megan Kelly POINT OF CONTACT TELEPHONE NUMBER: 305371-3877 II I II I I II I I I I 23c. 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): A streets cape plan for the existing landscape median from 5th to 15th Road on Brickell Avenue, the improvements include decorative paving, a k'~ystone fountain, sculpture monuments at each end, street signage/h;storical plaques, and xeriscape planting. Services: Conceptual/Cc1nstruction Documents Project Cost: $300,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I I I I I I (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects STANDARD FORM 330 (6/2004) PAGE 12 I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) I 20. EXAMPLE PROJECT KEY NUMBER: 7 21. TITLE AND LOCATION (City and State): 41't Street Middle Beach Beautification Project 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: I 22b. YEAR COMPLETED - CONSTRUCTION (If applicable).' 23. PROJECT OWNER'S INFORMATION I 23a. PROJECT OWNER: City of Miami Beach 23b. POINT OF CONTACT NAME: John De Pazos I 23c. POINT OF CONTACT TELEPHONE NUMBER: 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost). I A streetscape beautification project, incorporating planting, irrigation, paving improvements. A major element of the design is the Indian Creek Bridge renovation. The design process for this project, presently ongoing, included an exhaustive community consensus-building process, site analysis, development of Opportunity/Constraint maps, Alternative Design & Phasing Plans, Final Design/Cost Estimate Plan, and Construction Documents/Administration. I Services: Master Plan, Schematic Design Plans, Design Development, and Construction Observation. Project Cost: $4,200,000 I I I I I I 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT I (1) FIRM NAME Savino & Miller Design Studio Consul-Tech Engineering (2) FIRM LOCATION (City and State) North Miami, Florida Miami, Florida (3) ROLE Prime Landscape Architects Principal Firm I I I STANDARD FORM 330 (6/2004) PAGE 13 I I I I I I I I I I I I I I I I I I I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 8 21. TITLE AND LOCATION (City and State): Indian Creek Bridge Improvements 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 23. PROJECT OWNER'S INFORMATION 23a. PROJECT OWNER: City of Miami Beach 23b. POINT OF CONTACT NAME: Jorge Gonzalez 23c. POINT OF CONTACT TELEPHONE NUMBER: 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): The Indian Creek Bridge in Miami Beach is a vital link for pedestrians and vehicles alike. Without costly structural improvements, the bridge's lane and sidewalk dimensions were reconfigured to improve transit mobility and pedestrian "livability". The traffic lanes were reduced to a minimum width, and sidewalks widened. New pavers with recycled glass aggregate, glass mosaic tiles and decorative lighting were designed to create a unique gateway into the heart of Miami Beach. Services: Master Plan, Schematic Design Plans, Design Development, and Construction Observation. Project Cost: $4,200,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects Consul-Tech Engineering Miami, Florida Principal Firm STANDARD FORM 330 (6/2004) PAGE 14 I I I I I I I I I I II I II I I I I I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 9 21. TITLE AND LOCATION (City and State): 16th Street Streets cape Improvements 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 23. PROJECT OWNER'S INFORMATION 23a. PROJECT OWNER: St. Moritz Hotel Corporation 23b. POINT OF CONTACT NAME: Eric Nesse 23c. POINT OF CONTACT TELEPHONE NUMBER: 305520-2451 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): The proposed 16th Street extension will provide more direct access to the Convention Center Hotel and serve the hotel parking garage located on the south right-of-way of 16th street between Washington Avenue and Collins Avenue. The Landscape Design concept was to create a tropical and playful entry sequence to the hotel's arrival court. Decorative concrete patterns will integrate the 16th Street Streetscape with the existing city sidewalks and the proposed walkways for the hotel. Coconut palms were chosen as the street tree on the east 1 west corridor, which will provide an immediate and continuous tropical canopy and visual buffer to the garage. Services: Schematic Designl Construction Documents for planting, site-lighting, irrigation, and paving. Project Cost: $250,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects Consul-Tech Engineering Miami, Florida Principal Firm STANDARD FORM 330 (6/2004) PAGE 15 I I I I I I I I I I I I I I I I I I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 10 21. TITLE AND LOCATION (City and State): Southeast Normandy Isle Roadway Improvements 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 1996 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 23. PROJECT OWNER'S INFORMATION 23a. PROJECT OWNER: Zyscovich 23b. POINT OF CONTACT NAME: Bernard Zyscovich 23c. POINT OF CONTACT TELEPHONE NUMBER: 305371-5222 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost). The plan consisted of streetscape planting and paving on three streets in Normandy Isle. A small park is located near the center of the neighborhood, which is a simple, grass lawn encircled by flowering trees. Large canopy trees were specified for street trees to increase pedestrian comfort and improve the neighborhood's character. A median is created along one street with a heavy planting of palms. Services: Schematic drawings for planting, tree island location, median alignment, and Construction Documents for planting plans, specifications. Construction Observation. Project Cost: $1,100,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Prime Landscape Architects Consul-Tech Engineering Miami, Florida Principal Firm STANDARD FORM 330 (6/2004) PAGE 16 I I G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT (Fill in "Example Projects Key" section below before completing table. (From Section E, Block 12) (From Section E, Block 13) Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Barry R. Miller Partner in Charge X X X X X X X X X X Adriana Savino-Miller Project Designer, Quality Control X X X X X X X X X Talita Gutierres Project Manager X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Miami Beach Golf Course Streetscape Improvements 6 Brickell Avenue Median Improvements 2 Sunny Isles City Hall 7 41st Street Middle Beach Beautification Project 3 Espanola Way 8 Indian Creek Waterway Bridge 4 Homestead Bayfront Park 9 16th Street Streetscape 5 Washington Avenue Streetscape Master Plan 10 Southeast Normandy Isle Roadway Improvements I I I I I I I I I I I I I I I I STANDARD FORM 330 (6/2004) PAGE 17 I I I I H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED: I I I I I I I I I I I I I I I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. RIZED REPRESENTATIVE: 32. DATE SIGNED: I 9/05/07 I STANDARD FORM 330 (6/2004) PAGE 18 I I I I I I I I I I 1 I I I I I 1 I I I ARCHITECT-ENGINEER QUALIFICATIONS PART 11- GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 1. SOLICITATION NUMBER (lfany): FIRM (OR BRANCH OFFICE) NAME: 2a. 2b. FIRM (OR BRANCH OFFICE) STREET: 2c. FIRM (OR BRANCH OFFICE) CITY: FIRM (OR BRANCH OFFICE) STATE: FIRM (OR BRANCH OFFICE) ZIP CODE: YEAR ESTABLISHED: 2d. 2e. 3. 4. DUNS NUMBER: 5a. OWNERSHIP - TYPE: 5b. OWNERSHIP - SMALL BUSINESS STATUS: 6a. POINT OF CONTACT NAME AND TITLE: 6b. POINT OF CONTACT TELEPHONE NUMBER: 6c. POINT OF CONTACT E-MAIL ADDRESS: 7. NAME OF FIRM (If block 2a is a branch office): 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function b. Discipline c. No. of Employees a, Profile b Experience c. Revenue Index Code (1) Firm (2) Branch Code Number Landscape Architecture 3 39 Landscape Architecture 4 Architecture, Urban Design 3 Clerical, Admin 1 Intern (part-time) Other Employees Total 7 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM FOR 1. Less than $100.000 6. $2 million to less than $5 million LAST 3 YEARS (Insert revenue index number shown at riqht) 2. $100,000 to less than $250.000 7. $5 million to less than $10 million a. Federal Work I 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work I 4 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work I 4 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE I The foregoing is a statement of facts. 12, ~E~ 12b. DATE SIGNED: 9/05/07 12c. 1~ME AND TITLE: Barry R. Miller. Vice-President '-./ STANDARD FORM 330 (6/2004) PAGE 19 I I I I I I I I I I I I I I I I I I :1 I Berger Avort RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape r-~,_ n R P R p. r ~, r F. R. ALEMAN & ASSOCIATES, INC. I I I I I I I I I I I I I I I I I I I ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1, TITLE AND LOCATION (City and State) Sunny Isles Beach Proposal 2. PUBLIC NOTICE DATE 3, SOLICITATION OR PROJECT NUMBER N/A B. ARCHITECT-ENGINEER POINT OF CONTACT 4, NAME AND TITLE Frank R. Aleman, P.E. - President 5, NAME OF FIRM F.R. Aleman & Assocaiates, Inc. 6, TELEPHONE NUMBER 305-591-8777 7. FAX NUMBER 8, E,MAIL ADDRESS 305-599-8749 fraleman@fr-aleman.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (CheCk) .0:0 ZO W Of- 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT ::;; uu <Do<( 0: ::: :00:0 a. .., Ulf- X F.R. Aleman & Associates, Inc. 10305 NW 41 Street HEADQUARTERS. Local Office to be Suite 200 Responsible for Contracts in South a. Miami, Florida 33178 Florida. I n CHECK IF BRANCH OFFICE 3014 US Highway 301 N N/A Suite 300 b. Tampa, Florida 33619 I rxI CHECK IF BRANCH OFFICE 1080 Woodcock Road N/A Suite 277 c. Orlando, Florida 32803 IXl CHECK IF BRANCH OFFICE 1279 Kingsley Avenue N/A Suite 100 d. Orange Park, Florida 32073 !xl CHECK IF BRANCH OFFICE 4948 Six Oaks Drive N/A Tallahassee, Florida 32303 e. !xl CHECK IF BRANCH OFFICE f. n CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM o (Attached) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) PAGE 1 I I I I I I I I I I I I I I I I I I I 12. NAME Yvette A. Aleman, P.E. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Principal-in-Charge & QAlQC; Sr. a TOTAL Engineer 15 14, YEARS EXPERIENCE I b, V\1TH CURRENT FIRM 11 15, FIRM NAME AND LOCATION (City and State) F.R. Aleman & Associates, Inc. (Miami, Orlando, Lake Worth, Tampa, Jacksonville & Tallahassee, Florida) 16, EDUCATION (DEGREE AND SPECIALIZATION) MBA & MSCE Florida Internation University, Miami, FL 1997 & 1992 17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Professional Engineer, FL (No. 48185) BSCE University of Miami, Coral Gables, FL 1989 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) Member of the following Organizations: American Society of Civil Engineers (ASCE); Institute of Transportation Engineers (ITE); Colegio de Ingenieros Civiles de Cuba en el Exilio; Sunshine One Call of Florida 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Brickell Avenue (from S of SE 25th Road to SE 4th Street) PD&E - FDOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Manager 2004 - 2006 a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE LxJ Check if project performed with current firm This project involves a PD&E study to document the requirements for preliminary design including Public Involvement; Engineering Analysis & Reports; Environmental Analysis. FRA is developing three Build alternatives & preparing the necessary reports as per the FDOT PD&E manual. Additonal requirements include to collect all existing engineering and environmental data required for possible improvements to the existing four-lane divided facility. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Statewide Roadway & Traffic Data Consultant - FDOT Central Office PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Manager 2001 - 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE L.0J Check if project performed with current firm b. FRA provides SfW professional services such as: on-site QC check support on TMS data, processing traffic data, administering the telephone network in support of the TTMS network; improve the TMS including preparing plans, construction management & inspection, etc. Also we evaluate the project traffic forecasting procedures & propose improvements, FRA is training the Districts Statewide and other consultants in Basic & Advanced Project Traffic. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Districtwide Traffic Operations Minor Design - FDOT 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Principal-in-Charge & QA/QC 1998 - 2002 c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm Ms. Aleman is actively involved in revising and/or updating of previously completed construction plans and minor roadway designs for minor highway improvements, minor structures, signalization, highway lighting, signing including overhead signing, pavement markings and drainage. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Districtwide Traffic Operations Studies - FDOT 6 (Multiple Contracts) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Princpial-in-Charge or Project Manager 2001 - 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm d. FRA provides miscellaneous traffic engineering services, study types include: qualitative assessments (intersection & arterial); signal warrant, intersection, arterial, & left turn phase warrant analysis; composite studies (i.e., counts; inventory; travel time & delay; intersection delay; vehicle gap measurements; crash, conflict, LOS, arterial & queue analysis; traffic signal optimization; pedestrian group size & counts; spot speed study; and public involvement. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Misc. Roadway Design & Transportation Engineering - Sarasota County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Director & QAlQC 2001 - 2004 e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check if project performed with current firm Ms. Aleman oversaw the coordination and implementation of various tasks including: data collection; roadway inventory; the production of roadway plans & accommodation of utilities and utility crossings; intersection & traffic calming design for arterial & collector roads; maintenance of traffic plans, traffic engineering applications, railroad crossings, signalization, roadway lighting, intersection improvement, & other appurtenances. STANDARD FORM 330 (612004) PAGE 2 I I I I I I I I I I I I I I I I I I I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Sr. Engineer 12, NAME Amazia L. Kiboko, P.E., PTOE 14, YEARS EXPERIENCE Ib, 'MTH CURRENT FIRM 12 a TOTAL 18 15, FIRM NAME AND LOCATION (City and State) FR. Aleman & Associates, Inc. (Miami, Orlando, Lake Worth, Tampa, Jacksonville & Tallahassee, Florida) 16, EDUCATION (DEGREE AND SPECIALIZATION) MSCE University of Miami, Coral Gables, FL 1990 Post Graduate University of Trondeihm, Norway 1986 BSCE University of Dar-es-salaam, Tanzania 1983 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, FL (No. 49523) Professional Traffic Operations Engineer, FL (No. 24) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. etc.) Member of the following Organizations: Institute of Transportation Engineers (ITE); Sunshine One Call of Florida. Training for: Advanced FSUTMS, Roadway Plans Review & Preparation; National Highway Institute Traffic Modeling 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Final Plans Review - FOOT 4 (Several Contracts as Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Sr. Design Engineer & QAlQC 1992 - Ongoing a. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE LxJ Check if project performed with current firm Mr. Kiboko has been a part of this contract since 1992, as a subconsultant to various Primes. For this project, FRA offers final plans review services on miscellaneous roadway plans, including: signalization, lighting & traffic signal control systems. As part of this contract, FOOT FNTRUSTFO him to review OTHFR CONSUl TANTS' WORK. Additionally, he reviewes final plans for projects developed in both English and Metric Units of Measurement. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SunNav ITS for the Sawgrass Expressway (Design/Build) - FOOT 1 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Design Project Manager 2004 - 2006 b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm SR 869 (Sawgrass) from MP 0 to MP 6. Mr. Kiboko is the Engineer for the design of ITS. His role is to conduct day-to-day design activities related to plans preparation, design documentation & design criteria for this project. The main components of design involves design of Fiber Optic Cable communication distribution facility (trunk & branch cables and hubs), OMS, HAR Signs-Beacons-Transmitter, IDS, & CCTV. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miscellaneous Traffic Studies - Jacksonville, FL (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Traffic Engineer 2002 c. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm FRA was responsible for providing traffic engineering, data collection and utility location services for this contract. Tasks included capacity analysis, manual/machine counts, field investigations & partial report preparation. This work was for the Cecil Field Equestrian/Community Center. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Portable Traffic Monitoring Sites Design - FOOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Manager 2002 - 2005 d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Mr. Kiboko is not only the PM, but also the Design Engineer for this project. It involves the design of plans for PTMS to be incorporated into existing roadway resurfacing or construction projects. A PTMS provides the fixed infrastructure that can be use to collect traffic data, which may include volume, speed, and/or classification. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Districtwide Statistics Program - FOOT 4 (Prime) / 7 (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Manager / Sr. Engineer 1999 - Ongoing e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE , ~ Check if project performed with current firm FRA has served District 4 since 1999, however, we only recently acquired sub work in District 7. The primary objective of these contracts is to provide professional & technical services to supplement FOOT's Planning/Statistics Staff. The primarily activities performed are: TCI data collection & reporting, ADT & Vehicle Classification Surveys, Turning Movement Surveys, Mapping & Graphic Applications. STANDARD FORM 330 (6/2004) PAGE 2 I I I I I I I I I I I I I I I I I I I 12, NAME Fernando Z. Gatell, PSM E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Project Surveyor & Mapper a TOTAL 35 + 14, YEARS EXPERIENCE I b WTH CURRENT FIRM 18 15, FIRM NAME AND LOCATION (City and State) F.R. Aleman & Associates, Inc. (Miami, Orlando, Lake Worth, Tampa, Jacksonville & Tallahassee, Florida) 16 EDUCATION (DEGREE AND SPECIALlZA nON) BD Surveying Camaguey School, Cuba 1965 BS Surveying Ciego de Avila, Cuba 1959 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Professional Surveyor & Mapper Florida (No. LS-2821) 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.) Member of: National Safety Council; American Congress of Surveying & Mapping; National Society of Professional Land Surveyorsl; Florida Society of Surveyors & Mappers; Miami-Dade Chapter FSM Society 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Districtwide Engineering & Surveying - FDOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Manager 2001-2005 (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE W Check if project performed with current firm a. Under this contract, Mr. Gatell supervised 170 different LOAs for the last 7 years. The miscellaneous type projects assigned included but not limited to, establishment of baselines, reference points, bench marks, cross sections, topographical features, DTM, GPS and monumentation for FDOT right of ways and control maps. Currently, FRA is providing managerial assistance to the Department in the management of other consultants' survey contracts. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Design/Build Limited Access ROW Fencing in Clay County - FDOT 2 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Surveyor 2004-2005 b. (3) BRIEF DESCRIPTION (Brie' scope. size. cost, etc.) AND SPECIFIC ROLE ,~ Check if project performed with current firm Mr. Gatell will serve as the Project Surveyor. This is a Design Build project for fencing the SR 23 (Branan Field Chaffee Road) Limited Access Right of Way from SR 21 (Blanding Blvd.) northward to 300 feet north of Kendlewood drive at Clay County. Fence line staking and minor roadway improvements will also be provided. Involves control, design, right of way and construction surveying. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miscellaneous Intersection Improvements - Orange County (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Project Surveyor 2004 c. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm FRA provided miscellaneous surveys and utility locates at the following locations in Orange County: McCulloch Road, Dean Road with Lake Georgia Drive, Chickasaw Trail, Millinockett Lane, Lake Underhill Road, Golden Rod Road. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Emerson Ave from Indrio Rd to Indian River County Line - FDOT 4 (Sub) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Surveyor 2003 d. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm This contract included a full design survey of 2.5 miles, the establishment of a control network, recovery of historical baseline and full topo and DTM from the center of the existing canal to the east right of way of SR 607. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Intermodal Center (MIC) - FOOT 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Survey Task Leader 2004 - 2005 e. (3) BRIEF DESCRIPTION (Brie' scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Mr. Gatell serves as the Survey Task Leader for this contract which involves surveying, mapping, utility designating, utility locating of the existing surface and subsurface utilities to support the three design consultants for the MIC under contract to FOOT. STANDARD FORM 330 (6/2004) PAGE 2 I I I I I I I I I I I I I I I I I I I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Com tete one Section F for each ro 'ect.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Miscellaneous Traffic Engineering, Miami, Florida 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1997 - Ongoing 23. PROJECT OWNER'S INFORMATION a PROJECT OWNER b, POINT OF CONTACT Miami Dade County Public Works Vishnu Rajkumar, P.E. 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT FRA has provided miscellanous engineering services to Miami Dade County since 1997. FRA has been awarded varous consecutive contracts as a prime consultant. c, POINT OF CONTACT TELEPHONE NUMBER (305) 375-2090 The objective of these contracts is to provide services for the following types of work: traffic data collection; traffic engineering; investigations and reports; traffic calming; safety studies; transportation planning; design and plans preparation. The tasks emphasized under this contract are in the areas of design, traffic engineering; we have also completed signalization improvements and signing throughout various locations in Miami-Dade County. The following are recent tasks that have been provided under this project: . Development of a feasibility of implementing reversible lanes as a way to alleviate traffic congestion during the peak periods. The two corridors evaluated were SR 7/NW 7th Avenue and SR 968/Flagler Street. . FRA conducted traffic data collection for about 372 count sites under Annual Counting Program for Miami Dade County. Routine Volume Counts were conducted for three continuous days once a year. Collected counts were processed following Miami Dade County Software. . Conducted Speed Studies for Various locations within Miami-Dade County. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. F.R. Aleman & Associates, Inc. 10305 NW 41 Street, Suite 200 HEADQUARTERS & Responsible Office Miami, Florida 33178 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 3 I I I I I I I I I I I I I I I I I I I G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT (Fill in "Example Projects Key" section below before completing table. (From Section E, Block 12) (From Section E, Block 13) Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Yvette A. Aleman, P.E. Sr. Engineer X Amazia Kiboko, PE, PTOE Sr. Engineer X Fernando Gatell, PSM Surveyor & Mapper X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) Regional Computerized Signal System TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. 6 2 Professional Transportation & Engineering 7 3 8 4 9 5 10 STANDARD FORM 330 (612004) PAGE 4 I I H. ADDITIONAL INFORMATION 30, PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH SHEETS AS NEEDED, F.R. Aleman and Associates, Inc. (FRA) was established in January 1987 by Mr. Frank R. Aleman, P.E. and several associates who were employed by Sperry Corporation (now UNISYS). Over the years, FRA has developed into a well-respected, highly technological private consulting engineering and surveying firm dedicated to providing professional services and solutions to numerous governmental and private agencies. Today, Mr. Aleman Is the President and sole owner of this corporation. I I I FRA is a Minority Owned Consulting Engineering & Surveying Firm. FRA's knowledge and expertise lay in Project Development and Environmental Studies; Major and Minor Highway Design - Roadway; Traffic Engineering and Operations Studies; Intelligent Transportation Systems Analysis Design and Implementation; Traffic Operations Design; Surveying and Mapping; Construction Engineering Inspection; Planning and Subsurface Utility Engineering. The FRA Team is comprised of approximately one hundred full-time professionals who take pride in doing their jobs exceptionally well. The firm has grown to five offices located throughout the State of Florida in Miami (headquarters), Orlando, Tampa, Jacksonville and Tallahassee. I I As consulting engineers and surveyors, FRA conducts business primarily in the State of Florida, however, has customers throughout the United States, Central/South America and the Caribbean. Our largest single customer is the Florida Department of Transportation, though the customer list includes numerous other governmental agencies and many corporations in the private sector. I FRA has become well known for our specialty in the analysis, design, development and implementation of advanced traffic management, intelligent transportation and communication systems of all types. We are a high-tech firm with considerable investments in automation research, hardwarelsoftware development and computerization. Our software engineers have proven expertise in systems management an excellent track record in the design and implementation of complex traffic and transportation related systems. We develop application and controller (170, 2070) software as well as high tech communication systems. This organization brings a systems management approach to engineering solutions. Our engineering, management expertise and experience provide the ability to design, develop and manage total systems with varied requirements from the formulation stage through the operational, support and evaluation phases. I I For nearly a decade FRA has been providing services as the Engineer-Of-Record for various design-build contractors throughout state of Florida. The scope of design services provided by FRA encompass roadway, highway. communication, electrical, and design of cutting-edge-technology of ITS components. FRA has extensive experience and knowledge of scheduling challenges involved with the design-build projects. Our design team has successfully completed every project ahead of projected design schedule. I One of FRA's specialties remains in UTILITIES! FRA has worked with various FOOT Districts, Municipalities, Cities and Counties throughout the State in locating over 150,000 testholes and designating over 100,000 linear feet of underground utilities. We use cutting edge technologies whenever applicable, such as Ground Penetrating Radar (GPR). All of this and FRA's track record remains claim free! FRA currently holds 3 Districtwide Subsurface Utility Engineering Contracts with FOOT. I I In order to supplement and expand FRA's then existing survey services, FRA acquired an 18 year old survey and mapping firm in 2002, Fernando Z. Gatell, P.L.S., Inc. (FZG). FZG is now known as FRA, all of FZG's staff remained and we have since further expanded our combined survey resources by adding even more state-of-the-art equipment and survey personnel. FRA's survey experience includes both prime and subconsultant roles on numerous OM! Survey and Mapping contracts, as well as project specific design and construction contracts. I Additionally, FRA has been recognized by Hispanic Business Magazine, since 1998 among the "Top 500 largest Hispanic-owned Companies in the United States". Additionally, we have been recognized by the Greater Miami Chamber of Commerce in Florida as 'One of the 100th Largest Hispanic Business Enterprises in Miami-Dade County". I I I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. r: ~ a-~ I " ~" August30,2007 31. SIGNATURE I I 33, NAME AND TITLE Frank R. Aleman, P.E. I President STANDARD FORM 330 (612004) PAGE 6 I I I I I I I I I I I I I I I I I I I I ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) N/A PART 11- GENERAL QUALIFICATIONS (If a firm has branch offices. complete for each specific branch office seeking work) 2a, FIRM (OR BRANCH OFFICE) NAME 3, YEAR ESTABLISHED 4, DUNS NUMBER F.R. Aleman & Associates, Inc. 1987 187560981 2b, STREET 6. OWNERSHIP 10305 NW 41 Street, Suite 200 a. TYPE 2c, CITY 12d, STATE 12e, ZIP Corporation Miami FL 33178 b. SMALL BUSINESS STATUS 6a, POINT OF CONTACT NAME AND TITLE Minority (Hispanic) Frank R. Aleman, P.E. - President 7. NAME OF FIRM (If bloc~ 2a;s. branch office) 6b, TELEPHONE NUMBER I 6c. E,MAIL ADDRESS N/A 305-591-8777 fra lema n@fr-aleman.com Sa. FORMER FIRM NAME(S) (If any) Bb. YR. ESTABLlSHEC Be. DUNS NUMBER N/A 1987 187560891 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a, Function c. No, of Employees a. Profile c. Revenue Index Code b, Discipline Code b, Expertenee Number (1) FIRM (2) BRANCH (see below) 02 Administrative 16 C15 Construction Management 08 CADD Technician 5 C16 Construction Surveying 4 12 Civil Engineer 3 G04 GIS: Dvlp, Analysis & Data Collection 5 13 Communications Engineer 3 L02 land Surveying 15 Construction Inspector 8 l06 Lighting 21 Electrical Engineer 1 P05 Planning (Comm, State, Areawide) 2 29 GIS Specialist 2 SOl Safety Engineering/Accident Studies 38 land Surveyor 3 S10 Surveying; Mapping 47 Planner: Urban/Regional 2 T03 Traffic & Tra nsportation Engineering 5 60 Trafficrrransportation Engineer 7 ZOl Zoning, Land Use Studies 000 Sr. Project Engineer 2 000 Construction Engineering Inspection 3 000 Utility Coordinator 6 000 Subsurface Utility Engineering 5 000 Sr.lJr. Party Cheif 7 000 Intelligent Transportation Systems 5 000 Resident Compliance Officer 6 000 Utility Coordination 000 Project Administrator 1 000 Technician 21 Other Employees 93 Total 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 6. $2 million to less than $5 million FOR lAST 3 YEARS (/nsert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million a, Federal W:lrk 1 4. $500,000 to less than $1 million 9. $25 million to less than $50 mil/ion b Non-Federal Work 7 5. $1 mil/ion to less than $2 million 10. $50 million or greater c. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts a,SIGNATUY L a~ c, NAME AND TITLE Frank R. Aleman, P.E. - President I b, DATE August 30, 2007 STANDARD FORM 330 (612004) PAGE 6 II II I 1 I I I I I I I I I I I I I I I Berger Avort RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape i-~", R P R/l f- r lERRACON CONSUL liNG ENGINEERS, INC. I II ARCHITECT - ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any) NO. 07-07-03 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) I 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 14. DUNS NUMBER Terracon Consultants, Inc. 2b STREET 5. OWNERSHIP a. TYPE 10080 NW 53rd Street, Bay 2 I Corporation 2c. CITY j2d. STATE 2e. ZIP CODE b, SMALL BUSINESS STATUS Sunrise Florida 33351 N/A 6a. POINT OF CONTACT NAME AND TITLE 7. NAME OF FIRM (If block 2a is a branch office) Alex Montenegro, P.E. - Office Manager 6b. TELEPHONE NUMBER j6C. E-MAIL ADDRESS Terracon Consultants, Inc. 954- 741-8282 annontenegro@terracon.com 8a. FORMER FIRM NAME(S) (if any) 8b. YEAR ESTABLISHED 8c. DUNS NUMBER none 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c. No. of Employees a, Profile c. Revenue Index Code b. Discipline (1) FIRM (2) BRANCH Code b. Experience Number (see below) 02 Administrative 329 2 E09 Environmental Impact Studies, 1 06 Architects 6 Assessments or Statements 08 CADD Technician 3 Other Environmental Services I 10 Chemical Engineer 9 S05 Soils & Geologic Studies 2 12 Civil Engineer 97 3 IS Construction Inspector 184 T02 Testing & Inspection Services I 23 Environmental Engineers 101 I 24 Environmenta] Scientists 2]5 30 Geologists 161 27 Geotechnica] Engineers 287 2 34 Hydrologists ]2 36 Industrial Hygienist 30 40 Materials Engineers 101 57 Structural Engineers 14 58 Technicians 880 1 Laboratory Experts 103 Dri lIers 84 Other Employees 323 Total 2939 9 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 6. $2 million to less than $5 million FOR LAST 3 YEARS (Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 4. $500,000 to less than $1 million 9. $25 million to $50 million c. Total Work 2 5. $1 million to less than $2 million 10. $50 million or greater I I I I II I I I I I I I 1 a. SIGNATURE 12. AUTHORIZED REPRESENTATIVE The fore oin is a statement of facts. b. DATE I vB'.. ;( ~~/~ c. NAME AND TITLE Alex Montenegro, P.E. - Office Manager September 6, 2007 I I AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 6 I I I I I I I I 1 I I I I I I I I I I Berger Avort RFQ 07 -07 -03 Professional Design Services for the Collins Avenue Streetscape j I'~ _~ n R P ) RA T ! LOUIS BEGER GROUP I I I I I I I I I I I I I I I I I I I ARCHITECT - ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any) RFQ-07-07-03 PART 11- GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seekina work. ) 2a, FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4, DUNS NUMBER The Louis Berl1.er Group, Inc. (NYINJ Metro Rel1.ion) 1999 14-298-1229 2b STREET 5. OWNERSHIP 199 Water Street 2c. CITY 12d STATE 12e ZIP CODE a. TYPE New York New York 1 0038 New Jersev Corooration 6a POINT OF CONT ACT NAME AND TITLE b, SMALL BUSINESS STATUS Lawrence Pesesky, AICP, Senior Vice President 6b, TELEPHONE NUMBER 16c E,MAIL ADDRESS 7. NAME OF FIRM (If block 2a is a branch office) 212-612-7900 ext. 1917 lpesesky@louisberger.com The Louis Berger Group, Inc. 8a. FORMER FIRM NAME(Sl (If anv) 8b, YR. ESTABLISHED 6c, DUNS NUMBER Louis Berger International, Inc. 1953 04-388-1093 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Fundion c. No. of Employees a. Profile c. Revenue b. Discipline b, Experience Index Number Code (1) FIRM (2) BRANCH Code (see below) 05 Archeolol1.ist 131 26 A06 Airports: Terminals & Hanl1.ars 6 06 Architect 83 4 AIO Asbestos Abatement 5 08 CADD Technician 165 12 B02 Bridl!.es 6 12 Civil Enl1.ineer 705 34 CI5 Construction Manal1.ement 6 15 Construction Inspector 156 6 CI8 Cost EstimatiOl!.; Cost Enl!. & Analvsis 4 16 Construction Manager 27 2 EOI Ecolol!.ical & Archeolol!.ical Investil1.ations 7 18 Cost Enl1.ineer/Estimator I! 4 E02 Educational Facilities; Classrooms 5 20 Economist 136 2 E09 EISs, EAs 7 23 Environmental Engineer 48 12 H03 Hazardous, Toxic, Radioact. Waste Rem. 7 24 Environmental Scientist 176 28 H04 Heatinl!.; Ventilatinl!.; Air Conditioninl1. 5 27 F oundationlGeotechnical Enl1.. 56 6 H07 Highways; Streets; Airfield Pavinl1. 7 30 Geologist 79 12 P05 PlanniOl!. (Comm., Rel!.ional, State) 6 36 Industrial Hygienist 38 22 P08 Prisons & Correctional Facilities 5 47 Planner: UrbanlRel1.ional I!8 28 PI! Postal Facilities 5 48 Project Manal1.er 318 14 R03 Railroad; Rapid Transit 6 54 Security Specialist 25 I RI! Rivers; Waterways; Flood Control 5 57 Structural Enl1.ineer 289 9 SOl Safety Enl1.ineerinl1.; OSHA Studies 4 58 T echnicianl Analyst 422 16 S05 Soils & Geolol!.ic Studies; Foundations 5 60 Transportation Enl1.ineer 133 8 S07 Solid Wastes; Incineration; Landfill 5 62 Water Resources Enl1.ineer 26 3 T03 Traffic & TransDOrtation Enl1.ineerinl1. 6 Other Employees 1216 178 W02 Water Res.; Hydrolol1.Y; Ground Water 6 Total 4358 427 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 6. $2 million to less than $5 million FOR LAST 3 YEARS (Insert revenue index number shown Bt right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million a. Federal Work 8 4. $500,000 to less than $1 million 9. $25 million to less than $50 million b. Non-Federal Work 8 5. $1 million to less than $2 million 10. $50 million or greater c. Total Work 9 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement 01 facts. a, SIGNATURE d c>-~f~ u b, DATE September 11 , 2007 c, NAME AND TITLE Lawrence Pesesky, AICP, Senior Vice President AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (612004) PAGE 1 II 12, NAME E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Com Jete one Section E for each key ersan.) 13 ROLE IN THIS CONTRACT I David Aimen, P.P, AICP 15, FIRM NAME AND LOCATION (City and State) The Louis Berger Group, Inc., Florham Park, NJ Planner, Economist 14, YEARS EXPERIENCE a. TOTAL b, WITH CURRENT FIRM 21 20 11 II I 16, EDUCATION (DEGREE AND SPECIALIZATION) M.C.R.P., City and Regional Planning, Rutgers University, 1986 B.A., Sociology, Communication Arts, University of Wisconsin, 1981 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc) Transportation Research Board, Committee on Environmental Justice in Transportation; Transportation Research Forum; American Planning Association; New Jersey Planning Officials 19. RELEVANT PROJECTS 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) American Institute Certified Planners Licensed Professional Planner, New Jersey, #104365 I I (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Financial Sustainability Study, City of Sarasota, Florida. PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) a. 1998 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm Project Director. Supervised strategic planning study identifying and assessing potential initiatives to improve the city's fiscal position and livability. The year-long study included a review of recent city-suburb trends and preparation of models and forecasts of population, fiscal revenues and expenditures, tax base, mi~ration, tourism, employment, income, housing supply, land development, and povertb The financial-land use element included an ana ysis of the long-term SOIVen% and continued feasibility of a Tax Incremental Financing istrict (TIF) in light of private sector development proposals and plans and tren s and debt service requirements. An extensive outreach approach was followed with local stakeholders (Le., business, church, neighborhood association), a major daY-lon~ public event with workshops and recognized experts (i.e., academics, practitioners, public officials), and task-by-task briefing meetinps wit an internal management team of city department heads and the city manager, and the elected city commissioners, Client: City 0 Sarasota, Department of Planning and Development. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Township of Montclair, N.J. Downtown Redevelopment Plans. PROFESSIONAL SERVICES I~ONSTRUCTION (If applicable) b. 2006 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm Project Director. Supervised redevelopment plan to revitalize underutilized areas in and around the Town Center through streetscape improvements, downtown business strategies, public art investments, expansion of parking facilities, and affordable housing mechanisms, The recommendations in the plan are based on an in-depth public participation process that includes workshops with property owners and merchants and a public workshop for the entire community. Strategies for expanding parking included consideration of revenue-allocation districts, public-private partnerships, and parking "in-lieu" fee as means for raising capital for a hybrid (retail and parking) structure. Client: Townshio of Montclair, New Jersev. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Central Avenue Parking and Arcade Demolition Study. PROFESSIONAL SERVICES !CONSTRUCTION (If applicable) 2004 N/A C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm Worked on a component of the project dealinQ with crime prevention through environmental design (CPTED). This portion of the study focused on business and shopper surveys that Identified key factors inftuencing the willingness to frequent downtown businesses as well as gathering and analyzing crime data to identify factors inftuencing crime in the Central Avenue Study Area. The data was used to recommend buildina and oarkina desian chanaes, liahtina levels, and landscaoina olans. Client: City of East Oranoe, New Jersev. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Final Design Of Bound Brook Rotary and East Street Realignment PROFESSIONAL SERVICES I~ONSTRUCTION (If applicable) d. and South Bound Brook Streetscape Improvements. 2003 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm Collected and analyzed land use, zoning and socioeconomic data and prepared environmental justice and socioeconomic sections of an environmental screening study of a streetscape improvements project. Client: Somerset County Engineering (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Alternative Finance for Road Maintenance, Livonia, Michigan PROFESSIONAL SERVICES ICONSTRUCTION (If applicable) e. 2000 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm Participated in study of alternative financing options to cover parts of a proposed road maintenance program. As part of the analysis, the fiscal implications of various maintenance program options were calculated, including the implications for the mill rate levied by the City. Also included in the study were the implications of funding the maintenance program on the basis of targeted assessment districts. Client: City of Livonia. I I I I I I I I I I I I I II The Louis Berger Group, Inc. STANDARD FORM 330 (6/2004) Page 1 of 1 II I 12, NAME E. RESUMESOFKEYPERSONNELPROPOSEDFORTH~CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT I Bradley Decker, P.P., AICP, LEED, AP 15, FIRM NAME AND LOCATION (City and State) The Louis Berger Group, Inc., Florham Park, NJ Principal Planner 14, YEARS EXPERIENCE a, TOTAL Ib WITH CURRENT FIRM 8 I 3 11 I 16, EDUCATION (DEGREE AND SPECIALIZATION) M.R.P., City and Regional Planning, The University of North Carolina, 2002 B.S., Community and Regional Planning, Appalachian State University, 2000 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Leadership in Energy & Environmental Design (LEE D) Accredited Professional Licensed Professional Planner, New Jersey (License No.: L1-00583300) American Institute of Certified Planners (License No.: 019468) I I 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Transportation Research Board, Community Impact Assessment Subcommittee; American Planning Association; New Jersey and New York Metro Chapters, American Planning Association 19. RELEVANT PROJECTS m (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Montclair Downtown Redevelopment Plans PROFESSIONAL SERVICES I~ONSTRUCTION (If applicable) a. 2006 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZJ Check if project performed with current firm Deputy Project Manager. Created three redevelopment plans that aim to revitalize underutilized areas in and around the Town Center through zoning regulations, design guidelines, detailed redevelopment proposals for specific properties, streetscape improvements, downtown business strategies, public art investments, expansion of parkinJ facilities, private investment strategies, and affordable housing mechanisms. The plans used innovative techniques such as Revenue A location Districts (RAD), Transit Oriented Development (TOO), Inclusionary Housing Requirements, Five-Year Tax Exemption Program, Hybrid Parking Structures, Shared Parking Arrangements, Business Improvement Districts (BID), and Arts-Oriented Downtown Marketing Niches. The recommendations in the plans are based on an in-depth public participation process that included multiple visioning workshops with the steering committee and property owners and a design charette for the entire community. Client: Township of Montclair, NJ. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Raritan Valley Line Transit Oriented Development (TOD) Study, PROFESSIONAL SERVICES I~ONSTRUCTION (If applicable) b. Union County, New Jersey 2007 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZJ Check if project performed with current firm Task Manager. Evaluated redevelopment opportunities for ten municipalities and eight railroad stations along the Raritan Vall~ Line. Visual Preference Surveys (VPS) and market and policy questionnaires are being administered at visioning workshops to evelop consensus on recommended future land uses, circulation patterns, and streetscape improvements. The ultimate goal of the project is to develop an evaluation matrix to evaluate land use, transportation, marketing/retail opportunities, environmental issues, and TOO policies and rank the ten municipalities to identify the top ten municipalities with the most opportunities for redevelopment. Client: Union County Department of Economic Development, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bolton Corridor/Route 44 Market Analysis PROFESSIONAL SERVICES I~ONSTRUCTION (If applicable) 2007 N/A c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZJ Check if project performed with current firm Project Manager. Conducting a market analysis of the Route 44 Corridor in Bolton to assess development potential consistent with municipal goals of smart growth and new urbanism development. Performing detailed examination of market conditions for office, retail, and residential development including: a definition of market areas; profile of existing supply and market demand; and present market potential for different development types. Analysis of commercial potential focusing on niche retail and services opportunities to meet unmet demand, match demographic profiles of corridor travelers and local residents, and leverage community's historic and recreational assets. Client: Capitol Reaion Council of Government (CRCGG) of Hartford Connecticut and the Town of Bolton, CT. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Commercial and Mixed Use Design Guidelines, Town of Wappinger, PROFESSIONAL SERVICES I~ONSTRUCTION (If applicable) d. New York 2003 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZJ Check if project performed with current firm Task Manager. Created an illustrative smart growth handbook that included development proposals and revitalization strategies for the Route 9 Commercial Corridor. The handbook promotes a livable and attractive built environment through area-specific guidelines that address building design, traffic flow, pedestrian safety, landscaping, lighting, and sign age. The handbook includes photo simulations, district desiqn schemes, and recommended zoninq chanqes. Client: The Town of Wappinqer, New York. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Central Avenue Crime Prevention Through Environmental Design PROFESSIONAL SERVICES !CONSTRUCTION (If applicable) e. (CPTED) Study, East Orange, New Jersey 2004 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ZJ Check if project performed with current firm Coordinated qualitative audit of the condition, function, and design of on- and off-street parking facilities. Audit included field review, survey of local businesses to identify parking needs and strategies, and a review of facilities and streetscapes to develop design and improvement strategies for Crime Prevention through Environmental Design (CPTED). Coordinating demolition staging plan for removal of the Central Avenue Arcade so that parkinq, circulation, and access to downtown businesses will be minimally disrupted. Client: Citv of East Oranqe I I I 1 I I I I I E I I I II The Louis Berger Group, Inc. STANDARD FORM 330 (6/2004) Page 1 of 1 - - I I I I I m - m I I I m - I I I I 8. Berger Avort i f'~ ( 0 R P ) r< ft TEL RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape Licenses I. -.- I I I I I I I I I I I I - I I I I I Proof of Authorization to Transact Business in Florida ~ate6~~,~~lnri~a ..,.,,;'!-'...j ,.'",~",,' ,0\ 7~oaro of~roft", $iwmu,~, " ;~',1r; . rs ~ i~..'!lr ~. .1'-. J- Iri "'i.h'~ngtttcc ;'51 ~erie! ~,!art,~~lnc;. r\~,~mlln~.~'" ,i~' .% "U"U-;'ft"4:,,,,/ 'UHh-' de /I-'Y'~":'U~'''''; o/.%'c~t"~1Z{te..2~~~~;';fi' ,.'M-,hde';. /c c#r m?~//I",.n;"? .;""",.,i-AJ /r.' d;.. /m~6c dn-u;?.tf a .9'n'ft';,;/~''''aC (5;.,?bJ"i~'IIY4~<<i'~~"'/ ""uk"" ~0'/...... 47/. .97bn;m. .~...nl'/AJ. AUDIT NO.: 0709- 0011 :() CERTIFICATE OF AUTHORIZATION NUMBER: 4355 EXPIRATION: 28-FEB-09 DISPLAY AS REQUIRED BY LAW ~ of jf)r ~t_O,riba ~ '~,' ..,~ '.. Dw'- .1.1" i!ll'partml'nt of !;tatl' I certify from the records of this office that BERGER AVART, INC. is a corporation organized under the laws of the State of Florida, filed on October 16, 1981. The document number of this corporation is F50732. I further certify that said corporation has paid all fees due this office through December 31, 2007, that its most recent annual reporVuniform business report was filed on March 27, 2007, and its status is active. I further certify that said corporation has not filed Articles of Dissolution, Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capitol, this the Eighteenth day of May, 2007 Q o 0, o o Q CR2E022 (0 t ,07) ::zQuQItQ.ll , ~ ~ V "1..1 .OIllQIIQ.<m>..~ItO.a~O.~o ~.o!QlI~ItC?.aOIJOJil'OllOI:l I I I I I I E - - - - I I I I I I I I [' ;c;217 4001 I STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF LANDSCAPE ARCHITECTURE SEQ#LOS090201970 LiCENSE NBR 09 02 2005 050203719 LCC000208 The LANDSCAPE ARCHITECT BUSINESS Named below HAS REGISTERED Under the provioiono of Chapter 481 FS. Expiration date: NOV 30, 2007 I L SAVINO & MILLER DESIGN STUDIO, P.A. SAVINO & MILLER DESIGN STUDIO 4014 CHASE AVENUE SUITE 219 MIAMI BEACH FL 33140 JEB BUSH GOVERNOR SIMONE MARSTILLER SECRETARY DISPLAY AS REQUIRED BY LAW ACI 2 986 39 5 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN SEQ#L05121301691 1 . LICENSE NBR 12 13 2006 060391372 AA0002463 The ARCHITECT CORPORATION Named below IS CERTIFIED Under the provisions of Chapter 481 FS. Expiration date: FEB 28, 2009 SAVINO & MILLER DESIGN STUDIO 12345 NE 6TH AVENUE SUITE A NORTH MIAMI FL 33161 JEB BUSH GOVERNOR SIMONE MARSTILLER SECRETARY DISPLAY AS REOUIRED BY LAW ~tate ~$'flllri~ ~ .,>,O~<{~'.-' <;:"'~~il,.:'" a .,_y{~~ .:. r.":i; ~~ Qc 7(i1~ of iltJ<~.....,..c~ .. -.~a.~l" c:;c + ?".llCU'U k.~{QU?:5~~J\C-ltgtnl~rs ,/'"O~~"".I .:t- ~"rJ" T~!Z '?~~.u.ltan~e}nc. \~~, . :'~~~f' ;JJ m/d;.n:::.-d'm',,o,, d;. /I/'N'r:';rron.; .../. ~~;~~..:i:(.l.?if!!!jt{j'~(.;;;;I;r .~rd~dr>-;. /,.. ,../f?, rwpr/",.,.,nn? .)"....Nr.A! /n d" /m/./;r d,.,.,rr?h,., . .jJ.,,~wr"'/"r/ t:v'?;';'~'f~7if~!;;>'.>>';;';n/ r/.mw 'tMw,k, 471. .Y;~'nrh' .~t7hr/l"J. ''=' ll' ~ AUDIT NO.: 0709- 002039 CERTIFICATE OF AUTHORIZA TJON NUMBER: 8830 EXPIRATION: 28-FEB-09 DISPLAY AS REQUIRED BY LAW I I I I I ~ate ,~~.,~lorina . ... ~":I .' '-". G,.;.)'- ~..nu;b of :~~!t,,:~1.fe,55.u,nf!lt..,l_ :,:fl1nghtecJ:s - 1r- .. i,l (10.... F.Rj,!-le.!l1AA~j'si.ocla~'s Inc. ~.~. ';0: ~I~: I. r'lJ.' 'V -,;; \-, ' - -"ill!; ~c '... :~ "',/"'~,..,~,.,/ ,,/I,/'-, /,(,. /,,,,,..,;;,;..noJ ,./. V;:(h;.~::,.J.z,~.~(J'1;'",,;/', . 'hml'''/N. /'... ,.#,.. ""y'''''''''''? ",.".,,.,..; I.~ '" , ,., /',. a;. /I"~/'''' /,(,.,.,~?'" " . /).,;tf....';.n"/.y"'{N;,~,;-r..tI1l'(;>;;,h.;",/ "",/,-, '!:){(,/,/'{"/' -171. .91'...n;'A.- .'//('"',0'/",,. I I AUDIT NO.: 0700, OUOl75 CERTIFICATE OF AUTHORIZATION NUMBER: 4658 EXPIRATION: 28-FEB-09 DISPLAY AS REQUIRED BY LAW I ACt! 3 0 3 5 446 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFBSSIONAL REGULATION BOARD OF PROP' SURVEYORS & MAPPERS 1 .t~'i .".'t~I~.LICENSE NBR 01/18[2007 10604787~LB6785 The SURVEYING << MAPPING BUSINESS Named below IS CERTIFIED Unde~ the provisions of Chapter 472 FS. Expiration date: FEB 28. 2009 SEQ#L07011601219 I I -., I I F.R. ALEM~ AND ~SSOCT~TF.S TN~ 10305 NW 41ST ST SUITE 200 M1AM1 .l'L 33116 CHARLIE CRIST GOVERNOR DISPLAY AS REOUIRED BY LAW HOLLY BENSON SECRETARY I I I ACII 2036393 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD SEQ#LOS061601336 : . LICENSE NBR 06 16 2005 040993979 B0002656 The BUSINESS ORGANIZATION Named below IS QUALIFIED Under the provisions of Chapter 489 FS. Expiration date: AUG 31, 2007 (THIS IS NOT A LICENSE TO PERFORM WORK. THIS ALLOWS COMPANY TO DO BUSINESS ONLY IF IT HAS A QUALIFIER.) F R ALEMAN & ASSOCIATES INC 8400 NW 52ND STREET SUITE 208 MIAMI FL 33166 I I I I JEB BUSH GOVERNOR DISPLAY AS REQUIRED BY LAW DIANE CARR SECRETARY ,- I ,I I I , 1 I I I I 1 I I I I I I I I I I ,---- I I I I I I I I I I I I I I I I I I I 9. Berger Avort {,~ '~, n R F ") R Jl r ~, L RFQ 07-07-03 Professional Design Services for the Collins Avenue Streetscape Sworn Statement and Non-Collusive Affidavit I I I I I I I I I II I I I I I I I I I SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. I. This sworn statement is submitted to The City of Sunny Istes by Bere:er A vart, Inc. for RFO #07-07-03 - Professional Desie:n Services for the Collins Avenue Streetscape whose business address is _ Airport Executive Tower 1, 1150 NW nnd Avenue, Suite 350, Miami, FL 33126 and (if applicable) its Federal Employer Identification Number (FEIN) is 59-2128093 (IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 .133(l)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(l)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(l)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. I I I I I I I I I I I I I I I I I I I 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the following three (3) statements is applicable.) ~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLOR THE CATEGORY TWO OF ANY CHANGE IN THE INFO M ED IN THIS FORM. \. Luis A. Olivares. P.E. (Printed or Typed Legal Name of Affiant) September , 2007 by .. Notary Seal: \. ~ 5 Notary's Name Printed, Stamped or Typed ~~y p~, ~.~"f. ~:-t-: i ~Off\.O" Notary Public State of Florida Maria Quinones My Commission 00619276 Expires 12/22/2010 Personally Known: ~ or Produced Identification Identification Produced I II I I i I I I NON-COLLUSIVE AFFIDA VIT State of Florida ~ County of Miami-Dade~ J- Vi f I} and says that: () /> vClr(:.;:,. P E. / being first duly sworn, deposes I I I I I I I (I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) N either the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, finn, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of i age . rs, employees or parties in interest, including this Affiant. I I I I I s,;L~~ _, 2007 by Notary Seal: "t$YPI.r~ i'~'f- . . '" - ,~ ~?- . o'l' on\; Notary Public State of Florida Maria Quinones My Commission 00619276 Exoires 12/22/2010 Personally Known: /' or Produced Identification Identification Produced I I