Loading...
HomeMy WebLinkAboutCMF International Group, Inc. TRANSMITT AL __ eMF INTERNATIONAL GROUP, INC Date: October 10,2007 C''''y --- r- r "' .. _------. II lH 0ui"'i~r ISLES BEACH eMF INTERNATIONAL GROUP, I 9300 South Oadeland Boulevard . Suite 602 Miami . Florida . 33156 ~ Tele. (305) 670-1499 . Fax (305) 670-1495 ~".~' . . . _... LI I U ;' I~'I f('\ ~--_.~~._':~...~~.:~~~' Time: 10:00 A.M. (Local Time) Delivered to: Jane A. Hines, CMC City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Project RFQ: Professional Design Services for the Heritage Park and Public Parking Garage RFQ No. : 07-08-01 Issuing Dept.: City of Sunny Isles Beach Dte~fOWJ~ CITY (ii. ('0 . "'. .v_~,) ULtil,H Number of Sets: [D)IIE ~ IU WI IE ~ lnl oct 10 101 lhll ~ Atv CITY OF SUNNY ISLES BEACH e ~ Introduction Letter I). Company Information 2). References 3). Proof of Authorization 5). Proposed Contact Person 6). Listing of Proposed Personnel 7). Sworn Statements on Public Entity Crimes 8). Non-Collusive Affidavit Companv Information I). Professional Licenses 2). Occupational Licenses 3). Minority / Woman Participation 4). Local Small Business e e Standard Form 330 4).Professionallnformation e .. eMF INTERNATIONAL GROUP, INC. ARCHITECTURE INTERIOR DESIGN PROGRAM MANAGEMENT CONSTRUCTION MANAGEMENT AA-260007S October 10, 2007 Rick Conner Director of Public Works City of Sunny Isles Beach 18070 Collins A venue Sunny Isles Beach, Florida 33160 Re: RFQ No. 07-08-01 Professional Design services for the Heritage Park and Parking Garage Dear Conner; CMF is pleased to submit its teams' qualification for the Heritage Park and Parking Garage. CMF is a Miami Based Firm established to provide professional Architectural, Interior Design and Construction Management services to municipal, governmental and private clients in South Florida. As a full service Architecture, Interior Design and Construction Management firm, CMF is prepared to commit its staff and resources to design and complete this project for the City of Sunny Isles Beach. CMF has assembled a team of seasoned professional consultants with extensive experience in planning and design that address all the key design elements required for the success of this project. The team is capable of providing full Architectural/Engineering Services with expertise in the preparation of Construction Documents, and Construction Management. Our services shall include the following consulting tiers, architectural general design services and planning, public involvement, environmental engineering, geotechnical engineering, land surveyors, civil engineering, traffic engineering, structural engineering, mechanical engineering, electrical engineering and Construction Management and Inspection. . During the course of the project, the team will be providing the following tasks that are crucial to the project scope of services. They include project management, planning and attending Public Involvement meetings, preparing and taking Public Opinion Surveys, preparing boundary and topographical surveying, driveway design, drainage, designing and selection of site lighting, environmental permitting and mitigation plans, utilities coordination, preparations of project specifications, bid administration including assisting the City in the Contractor selection process, construction administration that include shop drawing reviews and RFI responses, coordination of all utilities location and planning with the local agencies the impact of this park, environmental considerations, usage flow and accessibility, irrigation and landscaping. CMF understands the complexity of the project and is prepared to address all the challenges the project may bring, providing solutions that will grant a successful project. CMF is recognized for its unique approach to its project deliverable. Our approach to a successful project starts with CMF leading the team working closely with the consultants, providing a viable holistic approach to the project. This occurs at the beginning of the project with the commitment from all consultants, that a successful project must be designed to meet the program requirements, providing the client with a creative design solution, and staying within the set budget and maintaining the project on the set schedule. This process starts at the inception of the project and it is followed through the completion of the project. This is accomplished by the implementation of our management approach and the direct executive management involvement in each and every project phase. The Firm has an array of Project types experience of remodeling and new construction for Municipal and Governmental agencies, Educational Facilities, Recreational Facilities, Auditoriums, Hospitality/ Hotels, Commercial/Retail Stores, Restaurants and Medical! Health Facilities, Airport, and Mass Transit Stations/ Facilities. Specific project type experience provided by CMF International Group, Inc. that relate to the Heritage Park are projects completed for Miami-Dade County Parks Department by Carlos M. Flores, AlA and Miami International Airport by Flor C. Munoz, R.A. e Carlos M. Flores, AlA, CGC is the owner and founder of CMF. His dedication to the architectural and construction industry has earned him 27 years of experience providing architectural and construction management services. His direct involvement as the principal in charge will assure his commitment to the success of the project. He extends his wealth of knowledge and 9300 South Oadeland Blvd.' Suite 602 . Miami, FL 33156 . Office: (305) 670-1499' Fax: (305) 670-1495 . info@cmfintlgroup.com . .. eMF INTERNATIONAL GROUP, INC. ARCHITECTURE INTERIOR DESIGN PROGRAM MANAGEMENT CONSTRUCTION MANAGEMENT AA-260007S direct personal experience of park planning, design and construction management as he leads the team as the Prime Consultant and Principal In-Charge for this project. His direct relevance project experience is noted on the Homestead Air Reserve Regional Park, where his role as Senior Project Manager and Designer, included the verification of the 40 acre regional park master plan, prepared a utilities master plan, scope verification for all phases of development, design and construction documents for Phase One that included recreational field center, multi soccer fields, multiple baseball fields including lighting and irrigation systems, picnic shelters, restrooms and storage buildings, bike paths and pathways and 3 parking lots. Other park project included the Women's Historic Gallery at the women's Park. As the Architect of Record, for the project, his responsibilities included the design and overview of the project. The Women's Historic Gallery program is similar to the program requirements for the Heritage Park such as, exhibit halls, lobby area, video/ projection room, multipurpose room, administration work area parking area and a toddler playground. His construction management experience includes the construction of multiple parks projects including the Southridge Aquatic Community Center that include a Splash Pad Playground. Flor Munoz, R.A. has been assigned to the Heritage Park Project as the Project Manager. As a registered architect with over 30 years of experience, Ms. Munoz has held various management level positions with the New York Transit Authority, Kaiser Transit Group, Southern California Rapid Transit System (SCRTS) and Miami-Dade Aviation Department MIA). Her direct relevance project experience is noted with the several parking structures and park projects, including a parking structure for 500 cars at MIA. Other relevant project experience includes working on several park projects for the New York Transit Authority as the Project Manager. Such projects include the Historic Restoration and renovation of Battery Park and Bowling Green Park in lower Manhattan. . As a full service Architecture, Interior Design and Construction Management firm, CMF has assembled a team of seasoned professionals with extensive experience in planning and designing of Parks and its ancillary facilities that address all the key design elements required for this contract. The team is capable of providing full Architectural/Engineering Services with expertise in the preparation of Construction Documents, and Construction Management. The team's consultants were selected for their relative experience for the project type and related work required to work on the Heritage Park project. The majority of the selected consultants have been involved on prior projects with the City of Sunny Isles Beach, gaining valuable knowledge of the city as it relates to their area of expertise. The following firms are the engineering firms that will be providing Professional Engineering Services. The Professional Engineering Services will be performed by Pistorino & Alam Consulting Engineers, Inc. Pistorino & Alam is a full service engineering firm that was established in Miami since 1967. The firm staff composed of 56 employees with 20 structural engineers and 6 Mechanical and Electrical Engineers. The firm has direct project experience in designing parking garage structures that exceed 500 parking spaces and similar park facilities. They have direct experience in working with the City of Sunny Isles Beach having been involved in numerous projects within the City limits. The structural engineering design services will be led by Nasir M. Alam, P.E. as principal in charge to oversee the work, and managed by Tahir Iqbal P.E. as the Project Manager. The electrical and mechanical engineering design service will be led by James Smith, P.E. and Evgueni Savistky respectively. The Professional Landscape Architecture and Master Planner is represented by Savino & Miller Design Studio a full service Landscape architectural and planning firm that was established in Miami since 1993. The firm has direct project experience in site planning for parking garage structures, municipal buildings and similar park facilities. They have direct experience in working with the City of Sunny Isles Beach having been involved in the design of the City Hall Project as the landscape architects. Their services included the site master plan, schematic design through construction phase for the planting, paving, site lighting, irrigation and fountain design. Other park projects with direct relevance to this project are South Point Park for the City of Miami Beach, Homestead Bayfront Park, Belle Isle Park and Metro Zoo. The Landscape Architectural services will be led by Barry Miller as principal in charge to oversee the work, and design and managed by Adriana Savino-Miller as the Project Manager. . The professional Civil Engineering Services will be performed by CES Consultants, Inc. with 20 years of experience and with direct experience in municipal and park facilities. CES has been involved with various municipalities in providing civil engineering services that include construction management services. The civil engineering design services will be led by 9300 South Oadeland Blvd.' Suite 602 . Miami, FL 33156 . Office: (305) 670-1499 . Fax: (305) 670-1495 . info@cmfintlgroup.com . . . .. eMF INTERNATIONAL GROUP, INC. ARCHITECTURE INTERIOR DESIGN PROGRAM MANAGEMENT CONSTRUCTION MANAGEMENT AA-260007S Rudy Ortiz P.E. as the principal in charge to oversee the project and managed by Jose A. Compress, P.E. as the Project Manager. CES is a certified disadvantage business both in Miami-Dade County and the State of Florida. The Professional Engineering and Environmental Services will be performed by Langan Engineering and Environmental Services. Langan is a full service civil and environmental engineering firm that was established in Miami since 1970. The firm is staffed to provide the necessary services for the project as it relates to Environmental Permitting including any necessary Mitigation Plans, Geotechnical Engineering, Land Surveying and Traffic Engineering. The firm has direct project experience in providing foundation design/ foundation systems based on the geotechnical information encountered on site. This is particularly important to the design of the parking garage structures. They have direct experience in working with the City of Sunny Isles Beach having been involved in numerous projects within the City limits. Such projects include Turnberry Ocean Colony and Solis Resort. The engineering design services will be led by Cristina M. Gonzales, P.E. as principal in charge to oversee the work, and managed by Lijian Zhou, P.E. as the Project Manager and Site inspection services to be performed by Mathew E. Meyer, P.E. CMF has assembled a team of proven professionals that provides the experience and the depth that City of Sunny Isles Beach is seeking. This team is 100% committed in providing its services to City of Sunny Isles Beach. CMF International Group, Inc. is proud of its exceptional Quality of Services and our willingness to work together in a seamless approach to obtain the best solution for our client needs. We at CMF look forward in working with the City of Sunny Isles Beach, and would like the opportunity of ting our teams qualifications in person. cc. File 9300 South Oadeland Blvd.' Suite 602 . Miami, FL 33156 . Office: (305) 670-1499' Fax: (305) 670-1495 . info@cmfintlgroup.com . .. eMF INTERNATIONAL GROUP, INC THE CITY OF SUNNY ISLES BEACH REQUEST FOR QUALIFICATIONS # 07-08-01 PROFESSIONAL DESIGN SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE. 1.6 Company Information 1. Corporate/Company History and Licenses. CMF INTERNATIONAL GROUP, INC. has been in practice for almost four years since the firm was found in 12/2003. The firm has grow to six full time employees providing excellent services to a clientele with a varied types of projects and services from Architecture, Interior Design, Construction Management, Owners Representative, Cost Estimates, Construction Administration and Design/Built CMF is a Corporation established in 12/09/03 in the State of Florida Address: 9300 South Dadeland Blvd. Suite 602. Miami. Florida 33156 Fax; 305 670-1495 Business Phone: 305 670-1499 Business website: CMFINTLGROUP.COM . Name of primary qualifier: Carlos M. Flores. AlA. NCARB. President /Chairman License number of the primary qualifier of the firm: Proof of Authorization -Florida Secretary of State P03000147567 Licenses- Architect AROO 14706 Architect Corporation AA26000757 Interior Designer: 100004308 Interior Design Corporation 1826000628 General Contractor CGC043347 Occupational Licenses - Professional, CMF Corp., General Building Contractor. 9.5.2 Ownership/Qualifier Information Name of primary qualifier: Carlos M. Flores. AlA. NCARB. President /Chairman Fed.1D # 73-1688588 If Corporation: Carlos M. Flores.AIA. NCARB. President/Chairman Share -100% . . References: Work performed for the clients for the past five years Bird Road Starbucks Shopping Center 8298 Bird Road, Miami, Florida Started 2007 - Expected Completion 2008 Bird Trade Center LLC. / New Market Properties · Mr. Ramon Ruiz, President Phone (305) 695-1700 Warehouse Storm Damage - Re Construction 10565 NW 132 nd Street, Hialeah Gardens, Florida Started 2006 - Expected Completion 2007 New Market Properties,lnc. · Mr. Ramon Ruiz, President Phone (305) 695-1700 e Southridge Community Aquatic Center Phase ill 11201 SW 196 Street, Miami, Florida Miami-Dade County Park & Recreation Department Prime: Corzo Castella Carballo Thompson Salman P A Stated 2005 - Expected Completion 2008 · Mr. Javier Salman Phone: (305) 445-2900 · MDPR- Mr. Guillermo Garcia, P.M. Phone: (305) 775-7815 Sevilla Office Building for the Astri Group, LLC 133 Sevilla Avenue, Coral Gables Started 2003 - Completed 2006 · Ms. Anabel de Leon Phone: (305) 610-3024 Chispa Restaurant for the Astri Group, LLC Doral, Miami, Florida Started 2003 - Completed 2006 · Ms. Anabel de Leon Phone: (305) 610-3024 Roche Bobois Furniture Store for Icora,lnc. 1. Re-Roofing &2.40 Years Re-Certification 450 Biltmore Way, Coral Gables, FL Started 1/2005 - Completed 11/2005 · Mrs. Vivian Gaubil, President Phone: (305) 444-1014 e Homestead Air Reserved Park Utilities Master Plan - Homestead, Florida Started 2000 - Completion 2006 Miami-Dade Park & Recreation Department · MDPR - Ms. Adelfa Martinez, P.M. Phone: (305) 775-7815 Carlos M. Flores, AlA, NCARB Construction Management Servic.es Carlos M. Flores, AlA, NCARB Design / Build Services Carlos M. Flores, AlA, NCARB Construction Management Services/ Cost Estimating, QAiQC and Construction Administration Carlos M. Flores, AlA, NCARB Project Management Services/ Owners' Representative Carlos M. Flores, AlA, NCARB Project Management Services / Owners' Representative Carlos M. Flores, AlA, NCARB Project Management Services / Owner's Representative Carlos M. Flores, AlA, NCARB Sr. Project Manager / Designer Heery International, Inc. .. eMF INTERNATIONAL GROUP, INC State of Florida Department of State I certify from the records of this office that CMF INTERNATIONAL GROUP, INC. is a corporation organized under the laws of the State of Florida, filed on December 9, 2003. The document number of this corporation is P03000147567. I further certify that said corporation has paid all fees due this office through Decelnber 31, 2007, that its most recent annual report was filed on February 1, 2007, and its status is active. I further certify that said corporation has not filed Atiicles of Dissolution. Given under my hand and the Great Seal of Florida, at Tallahassee, the Capital, this the Ninth day of May, 2007 ~u SecretalY of State Authentication ID: 400101995334-050907- P0300014 7567 To authenticate this certificate, visit the following site, enter this ID, and then follow the instructions displayed. www.sunbiz.org/auth.htmI - . . ~tatt .of~flotiba Dl'pnrtmrnt of ~tntl' I ccrtify from the records of this office that PISTORINO & ALAM CONSULTING ENGfNEERS, INC. is a corporation organized under thc laws of the Statc ofFJorida, filcd on April 23. 1986. The document number of this corporation is M30944. I further certifY that said corporation has paid all fees due this office through Deccmber 31,2007, that its most recent annual report/uniform business rcport was filed on January 18, 2007. and its status is active. I furthcr ccrtifY that said corporation has not tiled Articles of ~issolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capitol, this the Twenty-ninth day of January, 2007 CR2E022 (01-07) ~"Q"Q"~"' "b'~~h~~"a"9~'8'~< "g"~'~' ". '~"~'~'Q'(:H=~": ~ State of Florida Department of State I certify from the records of this office that SAVINO & MILLER DESIGN STUDIO, P.A. is a corporation organized under the laws of the State of Florida, filed on April 16, 1993. The document number of this corporation is P93000028651. I further certify that said corporation has paid all fees due this office through December 31, 2007, that its most recent annual report was filed on January 3, 2007, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my Itand and the Great Seal of Floritlll, lit Tlllullwssee, the Capital, this the Sixteentlt day of February, 2007 ~u Secretary of State Authemication ID: 900088523959-021607-P93000028651 To authenticate Uris certificate, visit the following site, enter Uris ID, and then follow tile instmctions displayed_ www.sunbiz.org/auth.html e .. eMF INTERNATIONAL GROUP, lNC THE CITY OF SUNNY ISLES BEACH REQUEST FOR QUALlFJCA TJONS # 07-08-01 PROFESSIONAL DESIGN SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE. Experience eMF INTERNATIONAL GROUP, INC. CMF is a Minority firm established to provide professional Architectural, Interior Design and Construction Management Services to governmental and private clients in South Florida. As a firm CMF, recent experience in reconstruction of Brolam Warehouse included design, coordination of Architectural and Engineering disciplines, code compliance and Construction Management. CMF current work includes Consulting for the Southridge Community and Aquatic Center which involves Quality Assurance /Quality Control, Cost Estimates and Construction Management, for Miami-Dade County Parks Department. Additional commercial work is conducted recently such as Bird Road Starbucks Shopping Center. . Carlos M. Flores, AlA, NCARB, President. Experience: Mr. Flores has more than 20 years in a wide variety of design and construction roles. He is the President of CMF International Group, Inc. and has served in management positions for other firms such as Senior Architect, Project Director, Project Architect, and Construction Manager. Mr. Flores experience in Park Facilities, includes the Homestead Air Reserve Park and Utilities Master Plan, Homestead, Florida. The Southridge Community and Aquatic, Phase III. Also Architect of Record for the Women's History Gallery at Miami-Dade County Florida which include site selection, design and programming for the public and educational areas. CMF has a vast experience in Projects from the Planning and Programming Phases, Design, Design Development and Contract Documents. CMF has also provided Construction Management Services functioning as Owner's Representative, Project Architect, and Senior Project Manager. CMF International Group is proud of the exceptional quality of services provided to its clients. Mr. Flores has unique perspective on design and construction, which directly benefit a project. Mr. Flores has an extensive resume of public and private projects, many of which are large and complex. . e .. eMF INTERNATIONAL GROUP, INC Proposer's Project Manager Flor C. Munoz. RA is an architect with over 30 years of experience at management level in various positions as senior architect with the New York City Transit Authority, which includes several transit stations and renovation of park adjacent to transit stations. Locally as Project Architect with the Kaiser Transit Group, which includes three major transit Stations such as Vizcalla, Dr. Martin Luther King and Hialeah Stations for the Miami-Dade Metro Rail. Experience as Transit Consultant for the SCRTS- Southern California Rapid Transit System. As Project Manager for the Planning and Development ~ivision at Miami-Dade Aviation Department. Several Projects included planning for parking facilities during the twelve year period at the Aviation Department. Ms. Munoz also has experience with private clients, medical, educational and commercial facilities. Ms. Munoz has been with the firm ofCMF in the Marketing and Architectural Areas for a year. Personnel Qualifications . Fred Poey. Is a Mechanical Engineer with 20 years experience in Construction and Project Management. . Mr. Poey is a Construction Manager at CMF for various projects such as BROLAM Warehouse, and Bird Road Starbucks Shopping Center. He was responsible for the supervision of the reconstruction of the Head Quarters for the Astri Group, Chispa Restaurant at the City of Ooral, Served as Regional Manager for the Tape Company, V.P. and CAO for AGRIDEC, Inc. and Mechanical Engineer for the David Taylor Research Institute. Gianina Moreno. She is a Graduate Architect in training at CMF. She works as AUTO CAD operator and 3D presentations. Work involves design and contract documents. She has been involved in several recent public and projects with the firm ofCMF and others. Carlos J. Flores. He works in cost estimates and construction management with CMF International Group, Inc. Projects involved experience in coordinating commercial construction bids, office management and Microsoft Excel, Word, and Power Point. . . . . SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sW2n statem~t is submitted to blfi{- p" Jrv,vA/1 ~/u~ /~fff1lct& by ~n./'oS M. rt.(;tU!Js for (!;M F hJT6-tuJA7JOI'\JAl. a.uJc.JF twe. whose business address is 1) '(300 ~~TH ~I:>6'LAAJP ~L.v~. SuJ-t6 (002 MI14Mi. FL.OflIPA ~3J'SG, and (if applicable) its Federal Employer Identification Number (FEIN) is 73.. J(PS~S P;;S (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(I)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defined in Paragraph 287.133(I)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. . . . 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the following three (3) statements is applicable.) --L (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. (2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. (3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, CHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED FOR THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS fi THE RESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUlES R CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THI::; FOR c;.Aj2.,t.~~ tA. FL.o(2.6~ (Printed or Typed Legal Name of Affiant) State of Ft.pfJ.IPtA County of MIAMi- ~~6 Sworn to and subscribed before me this 171 day of t!?~6m , 2007 by %j): ltfk, Notary's Name Printed, Stamped or Typed Personally Known: X or Produced Identification Identification Produced Notary Seal: NON-COLLUSIVE AFFIDA vIr . State of rtofJ.. ([)IJ County of ),flAM,'. '[)IfP6 ) M. F k; flfJ'J CAa./"o~ says that: (1) ~/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submi~the attached Bid; being first duly sworn, deposes and (2) ~she is fully informed respecting the preparation and contents of the attached Bid and of all pertine~ircumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; . (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; pric or prices quoted in the attached Bid are fair and proper and are not tainted by any iracy, connivance, or unlawful agreement on the part of the Bidder or any other of its sentatives, owners, employees or parties in interest, including this Affiant. C41/l.kJ6 M. Fk7/lB1 (Printed or Typed Legal Name of Affiant) day of 0(;170~61t.. , 2007 by Notary Seal: Notary's Name Printed, Stamped or Ty d Personally Known: ~ or Produced Identification Identification Produced . "t~~::""" MARTHA M. POEY l~tIt. NoCIIy. Public: . State of FklrIda ~~ . Commission &piw Oct 24. 2010 ~ CoIMlIsalu.. , DO &oe694 · ..... NIblII AM 8T ATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN 1940 NORTH MONROE STREET TALLAHASSEE FL 32399-0783 (850) 487 -1395 CMF INTERNATIONAL GROUP INC 9720 SW 72ND AVE PINECREST FL 33156 e, STATE OF FLORIDA - DEPARTMENT OF BUSINESS, AND '",' PROFESSIONAL REGULATION AC# 301952' AA26000757 01/09/07 060455153 ARCHITECT CORPORATION CMF INTERNATIONAL GROUP INC e IS CERTIFIBD under the provisions of ch.481 Ff Ilxpiration <1at... FEB 28, 2009 L07010900631 DETACH HERE AC# 3 0 19 52 9 8T ATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION .' BOARD OF ARCHITECTURE & INTERIOR DESIGNSEQ#L0701090063J : . LICENSE NBR 01 092007 060455153 AA26000757 The ARCHITECT'CORPORATION Named below IS CERTIFIED Under the provisions of Chapter 481 FS. ~XPiration date: FEB 28, 2009 DATE CMF INTERNATIONAL GROUP INC 9720 SW 72ND AVE PINECREST FL 33156 d~ STATE OF FLORIDA a~,,\",,-:~'~) DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION ... ro? BOARD OF ARCHITECTURE & INTERIOR DESIGN (850) 487-1395 ~~ i!i~~~MEMONROE STR~fT32399_0783 FLORES, CARLOS M 9720 SW 72 AVE MIAMI FL 33156 ,~:& STATE OF FLORIDA AC# 301957: ~~WDEPARTMENT OF BUSINESS AND \~~.' PROFESSIONAL REGULATION ID0004308 01/09/07 060455202 INTERIOR DESIGNER FLORES, CARLOS M . IS LICENSED under the provisions of ch.481 J'S. zzpiratioD <late, FEB 28, 2009 L07010900675 DETACH HERE r . I AC# 3 0 19 5 7 3 I I STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN SEQ#L0701090067~ : . LICENSE NBR 01 09 2007 060455202 ID0004308 The INTERIOR DESIGNER Named below IS LICENSED Under the provisions of Chapter 481 FS. Expiration date: FEB 28, 2009 . FLORES, CARLOS M 9720 SW 72 AVE MIAMI FL 33156 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN 1940 NORTH MONROE STREET TALLAHASSEE FL 32399-0783 (850) 487-1395 CMF INTERNATIONAL GROUP INC 9720 SW 72ND AVE PlNECREST FL 33156 ~ STATE OF FLORIDA _DEPARTMENT OF BUSINESS AND '~,' PROFESSIONAL REGULATION AC# 301960, IB26000628 01/09/07 060455146 INTERIOR DESIGN CORPORATION CMF INTERNATIONAL GROUP INC . IS CERTIFIED under the pravbiona of Ch.481 rs. 1l:Xp1raU= dat.. FEB 28, 2009 L070l0900709 DETACH HERE AC# 3 0 1960 7 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN SEQ#L07010900709 : . LICENSE NBR 01 09 2007 060455146 IB26000628 The INTERIOR DESIGN CORPORATION Named below IS CERTIFIED Under the provisions of Chapter 481 FS. 4ItXPiration date: FEB 28, 2009 CMF INTERNATIONAL GROUP INC 9720 SW 72ND AVE PlNECREST FL 33156 .----------- ------.-- -- ----------.----.--.------..,------ MIAMI-DADE COUNTY TAX COLLECTOR 140 W. FLAGLER ST. 14th FLOOR MIAMI, FL 33130 2007 LOCAL BUSINESS TAX RECEIPT 2008 MIAMI-DADE COUNTY - STATE OF FLORIDA EXPIRES SEPT. 3D, 2008 MUST BE DISPLAYED AT PLACE OF BUSINESS PURSUANTTO COUNTY CODe CHAPTER SA - ART. 9 & 10 FIRST-CLASS u.s. POSTAGE PAID MIAMI, FL PERMIT NO. 231 520965-5 BUSINESS NAME I LOCATION CMF INTERNATIONAL GROUP INC 9300 S DADELAND BLVD 33156 UNIN DADE COUNTY ""'::.t_1" c ',H'~I- I: "~"fi, ~.>(~' ~::,..",.,~ "'I.'/ RENEWAL LICENSE NO. 544433-6 602 e OWNER CMF INTERNATIONAL GROUP INC Sec. Type of Business 212 P.A./CORP/PARTNERSHIP/FIRM THIS 1& ONLY A LOCAL BUSINESS TAX RECEIPT. IT DOES NOTPEnUITTHE HOUlER TO VIOLATE ANV EXIST1NG OR REGULATORV OR ZONING LAWS OFTHE COUNTY OR CITIES. NOR DOES IT EXEMPT THE HOl.DER fROM ANY OTHER PERMIT OR LICENSE REQUIRED BY LAW.lHlS IS NOT A CERnFICATION Of THE HOLOER'S QUAUFI::J.. 110N. EMPLOYEE/S 1 DO NOT FORWARD PAYMENT RECEIVED MIAlA/-llADE COUNTY TAX COu..ECiOR: CMF INTERNATIONAL GROUP CARLOS M FLORES PRES 9720 SW 72 AVE PINCREST FL 33156 INC 07/24/2007 -60090000564 000075.00 \ 1\ \ \, , , \ \.... \ \ 1\ 1 \.. \ \ 1\ 1\ \ ,1\ 1\" 1\" H \".. 1 \ I \1\ "'" ;\ 1\ see OTHER SIDE . -'"~.- ------.- -- .---------- -----------,- -- --- MIAMI-DADE COUNTY TAX COLLECTOR 140 W. FLAGLER ST. 14th FLOOR MIAMI, FL 33130 2007 LOCAL BUSINESS TAX RECEIPT 2008 MIAMI-OADE COUN1Y - STATE OF FLORIDA EXPIRES SEPT. 3D, 2008 MUST BE DISPLAYED AT PLACE OF BUSINESS PURSUANT TO COUNTY CODE CHAPTER 8A - ART. 9 & 10 FIRST-CLASS U.S. POSTAGE PAID MIAMI, FL PERMiT NO. 231 464932-4 BUSINESS NAME I LOCATION FLORES CARLOS M 9300 S DADE lAND BLVD 33156 UNIN DADE COUNTY nus IS IWT A !3lLL-DO NOT PAY RENEWAL LICENSE NO. 485434-6 STATE# AR0014706 602 . OWgER CARLOS M FLORES Sec. Tvpe of BuslneBB ?12 PROFESSIONAL THIS IS OWLY A L.OCkl BUSINESS TAX RECEIPT. IT DOES NOT PERMIT THE HOLDER TO VIOLATE A/lY EXISTING OR REGULATORY OR ZONING LAWS OFTHE COUNTY OR CITIES. NOR DOES IT HEl'''T THE HOLDER FROM "'flY OTIiEIl PERMIT OR lICEt:SE REQUIRED BY LAW. THIS IS NOT A CERTIFICATION OF 1l1E HOLD ERoS QUAUFlCA- TION, DO NOT FORWARD PAY,J:Eh"T rJECEIVEO ~lIA/J.l-OADE COUUTY TAX COLLECTOR: flORES CARLOS M CMF INTERNATIONAL GROUP INC 9720 SW 72 AVE PINECREST Fl 33156 07/25/2007 60020000589 000100.00 SEt: OTHER SIDE I" i j III iL III I IILil1 iillll I. I Li'lll II! i i Illlliliii fill i lit I . e MIAMI.DADE COUNTY TAX COLLECTOR 140W. FLAGLER ST. 14th FLOOR MIAMI, FL 33130 2007 LOCAL BUSINESS TAX RECEIPT 2008 MIAMI-DADE COUNTY. STATE OF FLORIDA EXPIRES SEPT. 30, 200B MUST BE DISPLAYED AT PLACE OF BUSINESS PURSUANTTO COUNTY CODE CHAPTER 8A - ART. 9 & 10 FIRST-CLASS U.S. POSTAGE PAlO MIAMI, FL PERMIT NO. 231 520926-7 BUSINESS NAME I LOCATION flORES CARLOS M 9300 S DADELAND BLVD 33156 UNIN DADE COUNTY 7~:rs is ~,~~T ,~. ~~i:"!.....:l: NC: PA\' RENEWAL UCENSENO. 544394-0 STATE# CGC043347 602 OWNER FLORES CARLOS M Sec. TYpe of Business 196 GENERAL BUILDING CONTRACTOR THIS IS ONLY A LOCAL BUSINESS TAX RECEIPT. IT DOES IIOT PERMITTlfE HOLDER TO VIOLATE ANY EXISTING OR REOULATORY OR ZONING LAWS OF THE COUNTY OR CITIES. NOR DOES IT EXEMPTTIfE HOLDER FROM AIN OTHER PERMIT OR LICENSE REQUIRED BY LAW, THIS IS NOT A CERTIFICATION OF THE HOLDER'S OUWFICA- TION. WORKER/S 1 00 NOT FORWARD . PAYMENT RECErvro I.III.M'llADE COUNTY TJ<X COLLECTOR: 07/26/2007 60010000251 000075.00 flORES CARLOS M CMF INTERNATIONAL GROUP INC 9720 SW 72 AVE PINECREST Fl 33156 1..11 lit II 1111 \ I. \.\"\\t" \ I, \ \. I" ,I. .\\\." I' I. \\I. \ ..\.\.\ SEE OTHER SIDE . . . . ~~.. ADA Coordin.ation AgcndJ Coordination Anim.:ll Scrvic.CF Art in Public PIJ('C's AlJCfit and Man.1gcmcnt Servkc!) Avi;)tion l!uilding l:hJildjn~ Code CompliJncc Business Development C~pilallmprovcmcnts Citizens' Indcpcndcnt Tr,)nsponation Trust Commission on lthics and Public ll1Jsl CommUniGltions. Community Action Agcnt.y Communit)' & Economic: r.K~vclopmcnl CDmmuni')' R~I."jDns Consumer Services Corrections &. Reh<lhllilation CultumlAffairs Ef~ction!;; Emergency Managem~nl Employee RC'liltions empowerment Trust Enrerprise T cchnolo~w Servi c:es Environmental Rt"Sourn:..~ Milnilgcmcnt FJir Emp[oyment Practices finilnc.:l' Fire R~cue G('-'f1cra! ScrvicC'.s Administration GoV'C'mmcnr Infor01;\tion Omter Hi~toric Pre.!iervalion Homeless Trust Hous.ing ^gtmc.}' Housing Financ(! Authority Human SNvin":s lndt>pcndent Rel/j(...... Pilnel International Trade COnfiOftiurn JUVCf1il(~ Servic~s Medic,,1 Examin Metro-Mi. ml Action PI n Metropolitan PlanninG Organizalicm ?1rk and Recreation PI~1nl1ing and Zoning f>oljct' Pmcurerllent Managemenl Prt)rt~rt}' Appraisal Ptlblic Librar)' Syslt>fn Puhlic Vv'orks 5<1((~ N~ighb(ll'IJ()()d rrtrk~ Seitpml Solid \V.lsh' M.,nagt'111t'nl Str<ll~ic Rusint's!i Managemenf Tr'ilm Melro Thms.il Taitk Foret' no lJrh~tn FCOllCllT1ic R('vilali7illion VilC~}'d Mll<i('LIn1 Ami C,1fflt-'I1'i \'Valt"r & S~\\'t'1 Business Development 111 NW 1 st Street · 19th Floor Miami, Florida 33128-1906 T 305-375-3111 F 305-375-3160 miamidade.gov April 19, 2007 CERT. NO: APPROVAL DATE(s): EXPIRATION DATE: 9644 04/11/2007 - DBE 03/31/2010 Carlos Flores CMF INTERNATIONAL GROUP, INC. 9300 S Dadeland BM, Suite 602 Miami, FL 33156-0000 Dear Carlos Flores: The Department of Business Del.elopment has completed its re\oiew of )Our application and at1achments submit1ed for certification as a Disadvantaged Business Enterprise (DBE) and herebyappro'veS )Our firm as a DBE in the categories listed below. Your DBE certification is .elid for three (3) }ears, 8)q?iring as noted abo\e and}OUT' firm IfI.oiIl be included in our registry of certified businesses. While DBE certification qualifies )Our firm to bid and participate on projects INith DBE participation requirements, please note that this certification does not allow}au to participate on projects IfI.oith Community Small Business Enterprise and/or Community Business Enterprise (CSBE/CBE) program requirements unless )Ou are specifically certified in these programs. Please note that certification as a small business enterprise continues to be valid for one (1) )ear. If any changes occur wthin )Our company during the certification pericx:l (such as ownership, address, telephone number, trade category, licensing, technical certification, bonding capacity, or if the business ceases to 8)dst) )OU must notify this office in wifing immediately. /t is imperati\e that we maintain current information on y:>Ur company at all times. All inquiries or changes related to this certification should be directed to the Certification Unit between the hours of 8:00 a.m. and 5:00 p.rn. Monday through Friday. This department IfI.oiIl forward to)Ou an application for re-certification (a much shorter process) Vl-ithin four (4) V>ee~ of the abol.e expiration date. We look forward to )Our participation in Miami-Dade County's small and/or disadvantaged business prog rams. CATEGORIES: (Your firm may bid or participate on contracts only under these categories) Architectural Sen.lces (DBE) OBOR0020 ~ . . ~.. AnA Courdin,lIintl Agl'nrlJ COllrcl,n;1tion Aninloll Sr'rvin'" ArI in Puh!ir rl.l( t... AtuJil .lml M.lIl,'g(OnWnl St'rvin'!'l A\'i.lliIJII Jhlildiflg Building Codl:' CtUUI)Ji,:lnu' BusineSi Oevelopmfonl C'ritallrnprnvt'nwn~s CHill'n!;' Indlopt"fldent Trllmpon.ltion THI'it CIJlmni!islon nn t.1hics .1/llf r)llhlir-1rll~t CnnmulIli'''llicm!' Communily Action A~l~r1(Y CornmunilY'" fnmomh: Oc-'\1'lopmt'1I1 Ccmlmunily Rt'I,t1iun.. Con~unlt'r SPfvlrC's. Clnrec:jlm~ & RI!tllll.ililrtlicJO ClllllJr.11 A(f,~ir~ Flt.('rion.,. fmergpncy Mtln"~I'lm'nl Elnplfryt"(. R('I.lli(lllS fm'II)y,','rnwflI1msl Fnl~rpri!i(, T~~c:hnoll)~r ~'1Vift"~ F.11ViJOlulll'n[(l1 Rt.'!lUllr(l~ MdlMW"lW'nt Fair EnlploylUf4111 Pr.Klin!s Finrl nee Fiw Rt'!t('ut, G(!n(~l Ser\tices Adnlini!<.lr,llilm Go\{t'I'nment Inforn1.ltinn (A'tll(!( Hisluri<: Prt:'M.~'~llil)n t1C)1I1df's.,..; Trust ....Iousing ^u{mcy Houaoing Fi n..1l1Ct. AUllw.rity I tUnJdll Sc/Vice-5 lnoppend("ot R("\'il.'w P.41u~1 Inh'rn.lliondl Trd<!p GIn~(lflium JlI"'('nil(~ Services Business Development 11 1 NW 1 5t Street · 19th Floor Miami, Florida 33128-1906 T 3D5-375-3111 F 305-:~75-3160 miamidade.gov April 19,2007 CERT. NO: APPROVAL DATE(s): EXPIRATION DATE: 9643 04I11f2007 - CBE 03l31/2008 Carlos Flores CMF INTERNATIONAL GROUP, INC. 9300 S Dadeland BI\d, Suite 602 Miam, FL 33156-??oo Dear Mr. Flores: The Department of Business De\.elopment has completed its review of ~ur application and attachments submitted for certification as a small and/or disadvantaged business enterprise. This department hereby appro\€s ~ur firm as a Community Business Enterprise (CBE) in Miam-Dade County in the categories listed below. Your firm Vvill be included in our registry of certified businesses and this certification is valid for tv.el\€ (12) months, e>qJiring as noted abo\€. This certification may req uire additional review at the time of bid or Wlen)OUr company is being considered bya prime contractor to meet a goal. It affords )Our company the opportunity to participate as a small business in the competiti\e process for contracts. Please note that the trade categories listed below are the only areas that }.Our company is eligible to bid or participate in contracts under )Our current certification. If any changes occur Vvithin y.:Jur company during the certification period (such as oo.11ership, address, telephone number, trade category, licensing, technical certification, bonding capacity, or if the business ceases to exist) )OU must notify this office in lM'iting immediately. It is imperati\€ that Y\e maintain current information on )Our company at all times. All inquiries or changes related to this certification should be directed to the Certification Unit betv.een the hours of 8:00 a.m. and 5:00 porn. Monday through Friday. This department \Mil forward to ~u an application for re-certification (a much shorter process) Vvithin four (4) ~eks of the abo\e e>qJiration date. Please be ad..;sed that )Our firm may be prohibited from working on contracts obtained through this certification if)Ou fail to re-certify or if the firm loses its certification for any reason. We look forVllard to ;our participation in Miani-Dade County's small and/or disadvantaged business programs. PJ~lnning and 7fJnil)~ Polin' PrlKllrClllcrlt M,lll,lW'fl\('lll Prop<>n}' ^ppr.';<<lJ Puhli,. tihrilry 5ysll'fll Pulllit' \'Vorb SiJ(t' Nt.jghhorholKI Pdfh 5<..lporl Soljd w.,s.!(' Man.lw'nl('nt Slr,llegic Busilll'S!<llvLlll,lgenl(~ll! Tt',Ill1Ml'Iro lr,lO~il Til...!.. rurn' 011 Urb.m EO)Utllllit, RI'\I'il..li/,lliull \lilt dYd MlJ~"tJlll And C.lldl'l1" \V.IWr K S<~....('r Marsha E. Jacjqnan Director, DBD CATEGORIES: (Your firm may bid or participate on contracts only under these categories) Al.1alion Sy.;tems-Archilectural Design (CBE) Architeclt.re (CBE) Archilectt.ral Construction Management (CBE) DBDROO2O :'. . .ID ADt\ CtHlrdi,ldlil)11 Agc'1){I,1 Cf){lldjn.llll~n An/m.d ~.t\'ill'" All in Pllhlil PI.1I t~ Audit JI1(! M.IIMg('ult'nl S(,fvi('(~ Avi.ll!un Building Building Co(k' C:ompli.lItu' BUlOincttli Development C.lpililllml)((I'I.'('l!lt'IUh Citizerl.<;' [nck1X!IHJt;.nc Tr.lm.!)()r1.llic)I) Tru:-.t rommi\shm on f1hk!ii .1m! f'lJhlk 1msl rrl!1l1lmniGlliIJl1~ (()fnnlLmily AUj()fl A~cnq' Communi'>'.e.. (conc)mk D(!VC!I()prnl~n1 Ccmununily ~d.ltiOlU, Clm~um{'r S<.-rvkes G:ijH~~.,iiJm '" Rc:hilhilil.llkm C:u!tur.lIAfl,li,.. r1t'1,fillt1!o fmt'lt.W'U:Y M'ln.lgetmmf Emplo.,.(>(' Relcltkms Ernpcy.\lcrmt'nl Trml [~nlf~rprise T('chnolog~' Servin's [l1vironmenlJI R('S()urC(~ M.1Il<l~(~rncnl r;lir [ml)[cJymc'nl Pratti(l~s Fin.1nce riH' R(')l'UC G(>lwr.ll $t,"fVi<:l!S Adrnini!oolr':llion Government Infonn,llioo Q-n!cr IliSI(Hk Pr('s(~v.lfjon liomclf."!is Tru~t Ilousinl{ ^gcncy ttcHJ!\.inH Fin..tllCC l\ulhOl'ily I lumJI1 Scrvicl"S Indepcnd(~nl Rt'viev.' 1-,lnt'1 InlcmJliul,al Tr,\dc COIu,C>rlium Juvenile Scrvict":> Medica! [x..lmincr M(~~ro.Mj.ln\i Acrion Pl. Mctropulil,ln PIJlll1inJ; Or~Jniz..1lion f'.uk and 1~{'Cn."lfion Pl"nnjng Jlld Zoninr. Polin' Procuremenl M,II1.:lgcmcnt I.mpcrl}" ^ppr.,js;11 !Iublic Librilry SYSICII1 "uhlic VVorlr; S.lic NcighboriH)()d I~TkS S{!,lporl SDlid \'\1..151<." M;m.Jgcmcnt Stf,1tl~ic Busin{~~ Mill1:'1Acmel11 learn ~!'\<..[ro . TrJn~it k Fmcl' on U,h.lll [conomJ(: KC"vil.llizJlion Vilr.l)',l M1Jsc~um And G':Hd('fl~ \VJltr & ~c.'w('r Business Development 111 NW 1st Street · 19th Floor Miami, Florida 33121\-1906 T 305-375-3111 F 305-375-3160 miamidade.gov April 19, 2007 CERT. NO: APPROVAL DATE(s): EXPIRATION DATE: 11143 04/11/2007 - MICRO/SBE 03/31/2008 Carlos Flores CMF INTERNATIONAL GROUP, INC. 9300 S Dadeland BI\d, Suite 602 Miami, FL 33156-??oo Dear Mr. Flores: The Department of Business De\elopment has completed its re\1ewof )O'.Jr application and attachments submitted for certification as a small and/or disadvantaged business enterprise. This department hereby appro\eS ~ firm as a Micro/Small Business Enterprise (MICRO/SSE) in Miami-Dade County in the categories listed below. Your firm \Nil! be included in our reg istry of certified businesses and this certification is Vcllid for twel\e (12) months, eJtPiring as noted abo\e. This certification may require additional re\1ew at the time of bid or v.hen }Our company is being considered by a prime contractor to meet a goal. It affords }OUr company the opportunity to participate as a small business in the competiti\e process for contracts. Please note that the trade categ ories listed below are the only areas that JOur company is eligible to bid or participate in contracts under JOur current certification. If any changes occur \Nithin JOur company during the certification period (such as OW'lership, address, tel ephene number, trade categ ory, Ii censi ng. techni cal certifi cati on, bondi ng capaci ty, or if the business ceases to exist) you must notify this office in w-iting immediately. It is imperati\e that we maintain current information on JOur company at all times. All inquiries or changes related to this certification should be directed to the Certification Unit betwaen the hours of 8:00 a.m and 5:00 p.m. Monday through Friday. This department will forward to JOu an application for re-certification (a much shorter process) within four (4) 'Mle~ of the abO\e eJtPiration date. Please be ad\.1sed that your firm may be prohibited from working on contracts obtained through this certification if JOu fail to re-certify or if the firm loses its certification for any reason. We look forward to JOur participation in Miami-Dade County's small and/or disadVclntaged business programs. Marsha E. Jaclman Director, DSD CATEGORIES: (Your firm may bid or participate on contracts only under these categories) Zoning. Land Use Studies (MICRO/SSE) ln1erior DesignIDecorator Ser~ces (MICRO/SSE) Cost Estirmting (MICRO/SSE) Inspection And Certification Sen.;ces (MICRO/SSE) Consulting Ser\ices (MICROISBE) OBOROO2O . I i j I , I ! , i I I I I April 19,2007 CERT. NO: APPROVAL DATE(s): EXPIRATION DATE: 11143 04/11/2007 - MICRO/SBE 0313112008 Carlos Flores CMF INTERNATIONAL GROUP, INC. 9300 S Dadeland BI\<:I, Suite 602 Miarri, FL 33156-??oo CATEGORIES: (Your firm may bid or participate on contracts only under these categories) Anal}ticaf Studies AndSur..eys (Consulting) (MICROISBE) Buildings, Structures And COfTlJOnents Consulting (MICRO/SBE) Construction Consulting (MICROISBE) Feasibility Studies (Consulling) (MICRO/SBE) Construction Management Sen.ices (MICRO/SSE) . . DBDROO2O . ~ate of Jtflorib-a ~oarb of lElroUssiotmI tcrngineers . !-.//,.;;/.; /k,/ John C. Pistorino , PE ,:; /'''',w.;,.,/".; " .-.y}"p..;.;,,./I,,/ Y;/j/N/I,.,./, "/U4-~CCA,I/I/"" 47/. .;/7".,.,,4-, .~,h,h',;, Expiration: 28-FEB-09 AUDIT NO.: 0709-(' 'I, 1(\ P.E. Number: 11007 S. I. Number: 202 DISPLAY AS REQUIRED BY LAW . . ,- . . . ~ate of Jfflort-b-a ~oaro of Jrofessimml tttngilteerS ~- ~/I",;/.; d,,/ Nasir Mahmo~d Alam , PE ,:; /,,,,,./1.;"'/"'; " .--:IJ'r>ft.;.;/r'/l,,/r;/I?,/uh- "/lrk//t:j:r~l/n- 47/. .y7,./-,;h, .~'H"'H";' Expiration: 28-FEB-09 P.E. Number: 36954 S. I. Number: 677 AUDIT NO.: 0709- I) lit DISPLAY AS REQUIRED BY LAW . . ~nte o~ jfflori{tn ~oarh of ~roU$siotml ~ltgineerS :- 6(~J.;./.; a,,/ Tahir Iqbal, PE ,:; /'NW.;"'/ ".; " .ft,.p.JJ,r'/I"/ O/I?,///',,/I "/lrk,rY;h'~N'/,/1 471. .w"/I"k, . <M-,h,h'J. Expiration: 28-FEB-09 AUDIT NO.: 0709- I ('709h P.E. Number: 48061 S. I. Number: 1158 DISPLAY AS REQUIRED BY LAW . . ~ate of Jt[lort{):a I610arb of ~rofe55ional ~ngilteer5 . ';'~//r;;/.; ~,/ James Edward Trowbridge, PE ,:; //;or/I-;r'/ ".; rr .#",ft.;..;,;./",/ Y)/i?'/Ir,,, "/"~rr;h'~//r'/" 47/. . w"n;A-, . ~,/r,/r',;, Expiration: 28-FEB-09 P.E. Number: 57189 S. I. Number: 7022627 AUDIT NO.: 0709- DISPLAY AS REQUIRED BY LAW . . . . . ~ate of Jtflorirta ~oarb of Jrofessirltml IUngineers . ~6//r~;~' /,;{,,/ Evgueni V. Savitsky, PE ~:; /'rnl.;r,/ ".; " ..y;rfr,;,;"~"'r'/ Y:"?'/Ir','P "'lrA-'/.~/f,,/,/r'/' 47/. ,%,.,.,/;, . <M-,/r,/r..;. Expiration: 28-FEB-09 P.E. Number: 52760 AUDIT NO.: 0709- . . ~ate of Jtflori~a ~aarb of ~rofessiotml1:1ngineers . l/fi;.;/:; d,/ James F. Smith, PE ,:; //N'/I.;,.,/",; " .1I)."y{.,;.;/"'/1"/ ?;/I?'/I,.",/, ''/If'h'rY;~'',/lfi'/' 47/. .%.,.,"rk, .YIr,h,h',;. Expiration: 28-FEB-09 P.E. Number: 20196 AUDIT NO.: 0709- I I DISPLAY AS REQUIRED BY LAW . I . MIAMI-DADE COUNTY TAX COLLECTOR 140 W. FLAGLER ST. 14th FLOOR MIAMI, FL 33130 2006 OCCUPATIONAL LICENSE TAX 2007 MIAMI-DADE COUNTY - STATE OF FLORIDA EXPIRES SEPT. 30, 2007 MUST BE DISPLAYED AT PLACE OF BUSINESS PURSUANT TO COUNTY CODE CHAPTER 8A - ART. 9 & 10 FIRST-CLASS U.S. POSTAGE PAID MIAMI, FL PERMIT NO. 23 471409-4 BUSINESS NAME I LOCATION PISTORINO & ALAM CONSULTING ENGINEERS INC 7171 SW 62 AVE 4FL 33143 SOUTH MIAMI OWNER PISTORINO & ALAM CONSUL ENG INC Sec. Type of Business 212 P.A/CORP/PARTNERSHIP/FIRM HfS IS AN OCCUPATIONAL AX ONLY. IT DOES NOT _TlfE LICENSEE TO I ANY EXISTING E ORY OR ZONING AWS OF THE COUNTY Of! mESo NOR DOES IT XEMPT THE LICENSEE ROM ANY OTHER LICENSE 'R PERMIT REQUIRED BY AW. THIS IS NOT A EAnFICATION OF THE ICENSEE'S QUAUFlCA. JON. RENEWAL LICENSE NO. 155774-4 STATE' EB4397 EMPLOYEE/S 32 DO NOT FORWARD PISTORINO & ALAM CONSULTING ENGINEERS INC 7171 SW 62 AVE 4FL SOUTH MIAMI Fl 33143 AYMENT RECEIVED .AfIQ.OAOE COUNTY TAX OLLECTOR: 08/31/2006 60010000195 00@.1:St~ ~O i: ! I L !! il !! ! ! Ii ! I Ii I! ! Ill! i! ! 1I11 ! L ,I: L ! II! Ii L I L I i II I I ! II SEE OTHER SIDE . o '" ~ r-i o I"'l r-i N r-i \D o ~ ~ o w VJ Z o H E-t < HZ pC!J C!JH 1%1u) ~1%1 Q H , <~ r1 ~ II . - 0 0:.:: ll::~ o III ..J 1%1 ~ ~~ o tJ W U)1%1 U)E-t t- I%1H <( Z~ t- HtJ CJ) U)~ p< !:Q Ji:.l Ji:.l0 o Q E-t~ Z< 1%10 ~!:Q E-t ~ < tl4 1%1 Q I I~ I~ I<.D I 0::)- 1m, N I~ :'-' .~ ll:: !:Q Z 1%1 U) Z 1%1 tJ H H '>tf '>tf '>tf '>tf .-l o o ~ < U) Ji:.l .-l 00 '>tf f..! Q) ,JJO\ 010 III 0 ..c:N tJ .. Q~OO 1%1 ON U) Zm!:Q 1%1~1%1 tJOJi:.l H.ri .-l H m .. 0\ -ri Q) M U):>,JJ o E-tH 0 III \DU f..!'O 01%1~0I E-tO ~ I.OHr-IQ)O o ~ Q)..c:-ri o u.Q,JJ,JJ ~ .., III N <'0 f..! f..! C"'l Q) Q)'ri .-l Q)E:'OPt ..c:id~X N E-iZPI%1 r-I o ...-l H \D Q ...-l P C"'l E-i M U) <Z ~8 Hu) ll::1%1 QQ < 1%1 ~:> ..1%1< ~H I%1H~ HHE-t H ~~I.O ~ ~~1%1 H I 'Z<~ 00 ZZl!)I%1lI: HH'>tfE-tE-t :>:>MH~ <<NPO U)U).-lU)Z H Ji:.l ~ 1%1 H H H~ E-i~ 00< ~E-t ~~ U 1%11%1 Zoo o ~ H 00 :?; <{ ..J >- co o ill 0':: :::> o ill 0':: (/) <{ >- <{ ..J n... 211 I ~~ 000 ~~ 1%1 .. !:Q :> 1%10 IJC!J J I~ o I"'l r-i N r-i \D o ~ ~ o w VJ Z o H E-t < HZ pC!J C!JH 1%100 ~1%1 Q H <~ ZO OH H~ 001%1 <( mE-t C I%1Z Ji:.lH 0:.:: ~~ o tl4 ..J 1%1 ~ ~~ o u W 001%1 t- mE-t <( I%1H t- Z~ HU CJ) oo~ P< !:Q Ji:.l Ji:.l0 o Q E-t~ Z< 1%10 ~!:Q ~ < tl4 1%1 Q I I I I I I I I I ILD m (Y) <.D co m N ~ '-' ~ ~ !:Q Z 1%1 00 Z 1%1 U H H 00 Ji:.l ...-l 00 '>tf f..! M Q) \D ,JJ 0\ '>tf 010 N III 0 o ..c:N o Z U 000 .. < H 1%1 q.j CD < E-iH, 0 N ~~m!:Q NOE-t~1%1 r-tl4 ~ 0 Ji:.l M ~ 1%1 -ri ...-loum.. 0\ U .ri Q) M m:>,JJ o E-tHOlll \D U f..!'O 01%1 ~ PI E-tO ~ 1.0 H r-I Q) 0 o ~ Q)..c:.ri o u.Q,JJ,JJ N ~m III <'Of..! f..! MQ) Q)-ri ...-l~~ -g ~ N E-tZPI%1 .-l o ...-l H 1.0 Q ...-l P M E-t M 00 H Z Ji:.l C!J H 001%1 ~~ 1%1 ~:> 1%1< H H~ HE-i H ~I.O ~ ~1%1 H Z<~ o ZLt)I%1~ H'>tfE-iE-i :>MH~ <NPO m.-lmz ~ 1%1 H H H~ E-t~ 00< ~E-t ~~ U 1%11%1 Zoo o ::E: H 00 I :?; <{ ..J ~I o ill 0':: :::> 81 0'::1 (/)1 ~I ~I o ~~ 000 ~~ 1%1 !:Q:> 1%10 1 IJ C!J I I J r---__- iAC# 2173988 . I I I ! I ; I"~ f. Ie. I . , . f.'" I i , i ! . ST A TEOFFLORIDA ::.; :,:" '-",--- .-..-",. ," DEPARTMENT OF BtJSINE:SS.AN:b PROFESSIONAL REGULATION BOARD OF LANDSCAPE ARCHITECTURE SEQ#LOS0902019S7 , i. i I I I I I I I I i i i I 09/02 2005 050203719 LA0000866 The LANDSCAPE ARCHITECT Named below HAS REGISTERED Under the provisions of Chapter 48 Expiration date: NOV 30, 2007 FS. I , I i i I I j I I J MILLER, BARRYR SAVINO & MILLER DESIGN STUDIO 4014 CHASE AVENUE SUITE 219 MIAMI BEACH FL 33140 SIMONE MARSTILI..E:R ,. ...... SECRETARY .... JEB BUSH GOVERNOR DISPLAY AS REQUIRED BY LAW AC# 21]40 0 1...... .STATEOF FLORIDA' DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION. .., " BOARD OF LANDSCAPE ARCHITECTURE SEQ#Loso90201970 : 09 02 2005 050203719 LCC000208 The LANDSCAPE ARCHITECT BUSINESS Named below HAS REGISTERED Under the provisions of Chapter" 481 "FS. Expira~ion date: NOV 30, 2007j/ . ' ". SAVI-NO -&' MltJLER DESIGN STUDIO, P.A. SAVINO & MILLER DESIGN STUDIO 4014 CHASE AVENUE SUITE 219 MIAMI BEACH 'FL 33140' JEB BUSH GOVERNOR SIMONE MARSTILLER SECRETARY DISPLAY AS REQUIRED BY LAW . ,.... Cl)W C'I) mG . N <1:j:! iio c3wQ..:z ~oo;(:2:f- U)a..a.::$~ 0:00 :2:a:: i:i:;:i W Q. 00 o o N . ~ Wen <( (J)~ c We: - Z<( 00: en I I- :)<c a:i alee ~u..eei.La: UJogow O::WC\lwb: ><~o~<c !d:~('f)..J:J: ~(I)~a..O ~1c..~W w~~~g ~Z(I)c(.) (I):JWW :Joa::~> enoii:..J!z ~w><g;:J 0..... C W - 0 <C Co 00 Wo -I..:., en... ::a: 1-1- :! (l)Z :5 :J<t :!::J en a:: => c.. ..... o o N . i: t-= z =>0:(1) ooffi r; 01-...1 ,.... wOe"a::(W') CW<to('f) <cj..JoLi '? 0 i.L..J ~ ~O~i.L!i <e><o=< ~~:!::!::E o ,.... ~ 0- I- o Z o o . ..J ..J - m <( I- o Z 00 en - :J: I- '-0 I 0\ '-0 N CO ..... IV') -oJ <t 3: LLJ Z LLJO O:::Z W (J) Z W o ::i <t<t a.. o I---t ~ :::,) .- (/) Z (!) I---t (/) LLJ Q I---t ~ ZO:: <t 2LLJLLJI---t !(-oJ>~ o-oJ<t ol---t.:I: ..J~'-O'- - 0:: lV')~ol.SLLJO I <( ZZ IV') 0 -..:r Z z U"h-4 OCJ)~",,\O Nf3:>IV').-4 '-OZ<tNf'w") 1V')U)(/).-4f'w") :;) m <t a.. (/) ........ UJ UJ >.-4 o -oJ a.. ~ UJ o I---t Q :::,)(/) I-LLJ (/)0:: a.. o z a: (!) 0::: <( I---t UJ .-4 S (/) -oJ '-0 0:: UJ -oJ .-4 o Q I---t IV') !J.. ~ <t IV') i- 0::: o Z UJOUJ-oJ -oJZ:>LL o -oJ I---t <t C I---t:> I---t ~<t'-O~ (/) <t ol.S LLJI---t <tZ~ OZ Z<tLt"t:I: 1---t1---t~1- :>O::J"(')O::: <tQNO c.n<t.-4Z <t a.. ~ 0:: I---t U. ........ a.. I---t :I: (/) 0::: UJ Z I- 0::: <t 0::: a.. UJ ........ -oJ a.. -oJ 0:: I-f tJ) 0 2: tJ) U ~........ ol.S ~ · ~~w>>wa:wa:wC/)~< <t <-:::z::za::z:o:z:wcnU;oo m . o~~<~~z~~z-z~ -,.. Owf-w<C~uif-Ow~2:i 0... ~o;!;t::: wo.>O:::.:f-< (1) <wo::~C)cni=:EZ-~ic:(:::I ~ >a:wow~-w<~~20 ~ ~xo.>o::~ox~a:>~~ F-.-4 Z~f-oa:oa:wOOa:1f-a: tiN ocnof-Ozof-ff~offi~ (I) (/)cnzo::<!:l-z>-a:-~o~ ,^ _w WZ f-,^W~~ 0 \1tI zcno~Oz"" ""'5<C::Z: . ~UiW~CJ)N:::IW9O:G~wz ::z::::>oOxCI:OOowwo:I:2 '- m OT III Ot) 0 T n. 1'1':::>' '- r- o I---t Q :::,) I- c.f) Z (!) I-f c.f) UJ Q o z ..... 0::> w<t Z(/) S= o N .....'-0 000 <=00 N<= · >< ........ 0 Lt"t ~ O\O~ o~ NNo g;s ........ 0 0 iiio CO Q Q frlo .. Q '-0 Q c::wo: 00 f-<f- zoo w...!.w :E:E~ ><~ *$R - .... ..- ..- .... ... ... -- - -- ... -- - ... -- - - --- -- ... - - - ... - - ... - ... ... - ... -- ... - - ... ... - - ... -- - - - - - -- - ... ... -- - - ... - w c - en 0: W :r: L- b w UJ en I ?"" WW ~ (.t) ~ -B ~ <~ u.o d (f) Q ..:-:z ~o~:E1- U)c..a.;::$~ a:cri ~a: -. w u..~ Q. . co o o N . olS UJm Wt-= LLla: :?:< (1)1 1-0 :Jc( e:~ r.oco ~LLCOU.a: UJ080~ a::WNWa. X~O~<( ~r-;(\')...J:I: ~C/)t-=a.O ~Ia.r--W W>W<S:C Zl-enCO -ZenWO en;:)W> ;:)0 a: <t > moc:...J~ :iW><~:;) O. Ow-O < Co 00 Wo -I..!. all- :a: 1-1- ~ enz :ia :;)<( :ia:;) en a: :;) a. <C C - a: ..... o o C\I . ~ t-= :;)a:en ooffi ~ 01-..1 ,... wOe"a:(\') CW<COM ~o ..J..J it 0 it I -I", ~O~LL~ <(><0=< ~j!:!~:i o ,... > <( 0- J- a z o C I ..J ...J - m <( l0- a z ~") - en - J: I- "" I \::t co I'""'t co "" I'w") ...J <t q :3 q LU "" % "" LUO ~ O:::::Z: 0 wO (1)0:::: ffi<t 2# ....ILU ..... <t ..... (/) <t <[ % <t ~ 0:::: 1-4 Q. ~ Z <[ <t Q LUI-4 !C(O::::::>:E (.) LU <[ O...J :r: ..J...J~"'" ..... ~ ec:: Ln~:EUJo I <t ZZ N 0 ~ ~ Z Ln ..... 0\ IfJ) I-f \,'1". \0 ~w:>l'f),..-4 ...oZ<CNI'f) ,.." U5 (/).....,.." ::) 00 - - <C - - a.. - ... .- - 0 ... - ~ - Q - - :::) .- - ..... ... - (/) - - ... c Z ... - 0: <C(!) - ~ ... ZI-f ~ - - <t(/) '-0 ... a:: - I-fLU ~ - 0 O::::Q I'f) - IJ.. .- Q <C1'f) ... b - <[0::: - - LULU...J - Z - 0:::...J:>u.. - 0 LU...J<t ... .- 0 ...J ~ ...... - ...J:E'-O:E - - ...... <t - - :E:~LU~ - Z:E: - - 00 - ... ZZLn:l: - - I-f~q..... - - :>:>1'1)0::: - <[<[NO - (/)(/),..-4% - ... - - <C Z <[ I-f 0:::: Q ...J <t <t % 0::: 0 LU 1-1 ...Jcn(/) ...J~(/) I-fCLU :E'~ u....J I- W >- >- W a: W a: w en LL. ~ .- oc.t;:::J:z~~o:t:~<f);j)oo O LLI ^'oo......c.t~ z........z-zu: - ....o-....wq:LL. .....owJ:o- Z 0 a....J~i~5o~0..>-o;i=;i I-f m <wa:..J~~i=:Ez::::ic.t~5 a: ::> e- N>-C:wQw<((3wc.t ..Ju:;(/) w <C r::::: ,......J ~ 0.. > II: ..J X ~ a: >- _ - .- z.......oc:oc:wOoml-c: ~ (/) d NO(l)ol-ozol-ff:....offi~ ~ ~ (l)cnza:Oz>-a:_Wo..J o CJ) -~cn~~o~CI)~:E5<~. ~UiW..J(/)N;:)W..Ja:Ol-wZ J:;:)ooxa:OOOWWO:t:Q ....mc:;:WOOCl:J::n.ll:21-..... x j5 or: Wz 2::;:) wo frlo .. a:wa: 00 ....<.... zoo W..l.W :E:;i..J >-c.t..J 0;(-0 0..::20 .~ ......~ w 000 0 00= - en No · '00 0: ~o~ ~ NN 0 t- '00 0 COo 0 LU 0-..0 C w rn . ,.. C/)W ~ C/)CJ ...IN <1:;$ L&.O ...I C/) C "Z o -- ~O~:i!:: C/)Q. -:e a:uj :Ea: -. W L&.:;:) Q. co (:) (:) C\I . ~ en 0) ent-= ~ Wa: a: ~<I: O en. I- :;)<c e:~ alco ~ La. CO La. a:. wogow a:WNWti: ><~O~<I: ~~CW)...I:1: ~C/)t-=Q.O ~.Q.~W W>W<cC Zl-enCO =!enWo v'-W~ :;)Oa:<c> alOQ:...I!Z ~W><g,:;) OCW-O <c Co 00 Wo ...J~ all- ~ 1-1- :!: enz ~ ::')<1: ~:;) f/) a: :;:) Q. ..... (:) (:) C\I . ~ t-= ~a:(I) 82ffi ~ ---...I .... WOCJa:CW) CW<l:OCW) ~g~g~ ~0::La.~ <~(:):5<c -~qoqo- :!~........:E (:) .... ~i: r:t: ,..... . r-4 ~ 'd" 0\ ~ N ....J <t -..0 :3 -..0 UJ CX) Z 0 UJo 0 O:::z 0 WO CJ)<t z ....J W (,) :J # UJ t- <t t- en -p 4,..- o Cl I _.3 _oj en ~;.4 to (.I) :t~ ~~c~ NW .== -..oc:( NZ ~ """W ,....,Z NCi) ::J III <t foo-t ~ z <t o UJ foo-t ~ :>~ (,) > <t O 0::: :J: ...I 0::: \0 t- - <t et::: c:QUJO ZZ 0::: UJ Ll'b--t ....J~\oO ....J~...-f foo-tN~ ~...-f""" > 0:::0 0:::0 <t~ c:Q7n ::::J o:::CO IJJO ..JC3) _ ..J c. W foo-t'=:- z ~c..i ~ ~ c a: ~ a: o u. I- o Z o C o foo-t Q :::) t- en Z (!) foo-t r-4 en \0 UJ r-4 Q ,...., <tl'/") 0::: UJUJ....J ...J:>u. >...J<t 0::1-4 foo-t O::::E:""O~ <t <t =<<SlJJfoo-t Z~ 0::0 UJZLl'\X ....Jt-t\j'"t- ....J:>,....,O::: t-t<tNO :E:(/)...-fZ ...J <t Z o foo-t en en UJ u....Jl-w>>wa:wa:W(/)u.~ O<r:;::::r:Z~:E:O:Z::~(/);OO ~Q.I-<(I-.I-ZI-...Z:ZU: ~jjjt:Wil(~uiI-OwI-2::i O:E~5(/)WQ.>o;:~~ <(Wa:..JCI:>j::EZ-<( (\,b..a:wow;>-w<(..J..J20 ~XQ.>a:jo><:iEa:>!::!" ~I-Oa:Cla:w~otOb:ffi (/)OI-OZOI-u.I-CWC (l)U)za:Clz>-a:-~o..J -~(I)~~O~(/)W:ES<(~ . ~CiiW..JU)N::;)w9a:Ol-wZ :r:;:,OOxa:OOOWwO:r:O I-tOC:r:wOOO:r:o.a:ZI-i= ~ C~ Wz :::;:, wo go.. a:wa: I-ce z~o w..!.w :E:E..J ~S5 CL:EO - - - - - ... - ... - ... - - ... - ... - - - ... ... - - ... - - ... - ... ... - - - - - - ... - - - - - - - - - - - - ... - - ... - _.- ... - o """\0 000 ~ 00 0 ;'ft NO' VI ,"00 CC ~O\O W NNO ~ ,"00 0 CX)OO w O\()o w en . . ~ate ai~~Jfflariaa ~oarD of :.;1.; ru/l'A'r'/-r'.::a;( rmr/tor /A';" ///'r:,,,:;,//y,,; r/9f:r;;rj:f;. . ,:fr.i:/I-/ .'70//.rrfio',;, /.r. r#-/' wryr/'r'I'n/'7 .;r'n./n',; /.r. /~'/W:o:;;'o fi{;'rwyA" rr; ;..JPr.ft.;.;ri:'/'Nr/" g/I;'i;':~:1Y;;)if'~.. . :,f,:;';~~;N/ rmr/l-'/' '6}fr~//.r'/' 47 J. .:Ya.n'r/l-z .%r/.rrfio',;, L";>:''-.l:T.<:.Y:~:;(;.. AUDIT NO.: 0709- CERTIFICATE OF AUTHORIZATION NUMBER: 8811 EXPIRATION: 28-FEB-09 DISPLAY AS REQUIRED BY LAW . . . . ~atc of~lllrib:a 7(12 .~ f ~\ <7C . ;!!aoaru .0 5: f; rg~ {lc1tBtne.ers Ji""" E~ . ..~) . >;.tj.,:..1E") / /.; /;N'/I')N/ ('1'.; rI' .::/n~;.;a'VU'I'/ ~~f<-~f;: .""1'. '.(~iq'/' '6.%r,/I/n'" 47/. . q72Jv"/rk' '%"'//#";. ;t't:.:e::C_,':)(("','{T,,,:t:.,-,,--;t- Expiration: 28-FEB-09 P.E. Number: 54604 AUDIT NO.: 0709- 016191 DISPLAY AS REQUIRED BY LAW . ~ate (le~ e~l{lriba J )EltBhtl'crs -) ,ihoi.lr-l't nf . PE 1':, ;;~''''/I'df/ "/'1 I/' ,-/}"0\'9/;"'l'U// ' Expiration: 28-FEB-OSi ///Irh~''(/{r.l'/J/Yr -/7 j, . ///.n;'~'I ,/1/,,/1'///'.;_ P.E Number: 65557 AUDIT NO.: fJ709 I, DISPLAY AS REQUiRED BY LAW . . . . MIAMI-DADE COUNTY TAX COLLECTOR 140 W. FLAGLER ST. 1st FLOOR MIAMI,FL 3313Q 2006 LOCAL BUSINESS TAX RECEIPT 2007 MIAMI-DADE COUNTY - STATE OF FLORIDA EXPIRES SEPT. 30, 2007 MUST BE DISPLAYED AT PLACE OF BUSINESS PURSUANTTO COUNTY CODE CHAPTER 8A - ART. 9 & 10 FIRST-CLASS U.S. POSTAGE PAID MIAMI, FL PERMIT NO. 231 THIS IS NOT A BILL - DO NOT PAY 290468-9 TRANSFER BUSINESS NAME I LOCATION _B!;CE;JPT NO 057 087 - 0 LANGAN ENGINEERING &ENVIRONMENTAL STATE# EB6601 SERVICES INC 15150 NW 79 CT 33016 MIAMI LAKES OWNER LANGAN ENGR & ENVIRO SVCS INC Sec. TYRe of Business 21~ P.A/CORP/PARTNERSHIP/FIRM nllS IS ONLY A lOCAL BUSINESS TAX RECEIPT. IT DOES NOT PERMIT THE HOLDER TO VIOLATE ANY EXISTING REGULATORY OR ZONING lAWS OF THE COUNTY OR CITIES. NOR OOES IT EXEMPT THE HOLDER FROM ANY OTHER PERMIT OR LICENSE REQUIRED BY LAW. THIS IS NOT A CERTIFICATION OF THE HOLDER'S QUALlFICA. llONS. PAYMENT RECEIVED MIAMI.DADE COUNTY TAX COllECTOR: 03/29/2007 60010000006 000004.50 SEE OTHER SIDE 200 EMPLOYEE/S 1 DO NOT FORWARD LANGAN ENGINEERING &ENVIRONMENTAL SERVICES INC 15150 NW 79 CT 200 MIAMI LAKES FL 33016 j! I ii II i ii Iii lilll! jj! ill I j L L i ! ,Ill L ! II, j j II i I ) ! 11111 L II it - ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (CitV and State): PROFESSIONAL DESIGN SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE. CITY OF SUNNY ISLES BEACH - MIAMI-DADE COUNTY, FLORIDA 2. PUBLIC NOTICE DATE: 07-08-01 3. SOLICITATION OR PROJECT NUMBER: RFQ. NO. 07-08-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE: Carlos M. Flores, AlA, NCARB - President 5. NAME OF FIRM: CMF INTERNATIONAL GROUP, INC., Inc. 6. TELEPHONE NUMBER: (305)670-1499 7. FAX NUMBER: (305)670-1495 8. E-MAIL AOORESS:cmflores@cmfintlgroup.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) 9a. . 9a. 9a. 9a. 9a. 10a. 11 a. PRIME (CHECK HERE): CMF INTERNATIONAL GROUP, INC. JOINT-VENTURE PARTNER (CHECK HERE); NfA SUBCONTRACTOR (CHECK HERE): NfA FIRM NAME: CMF INTERNATIONAL GROUP, INC. IF BRANCH OFFICE CHECK HERE: NfA ADDRESS 9300 SOUTH DADELAND BLVD, SUITE 602. MIAMI, FLORIDA 33156 ROLE IN THIS CONTRACT: Consulting Architect for Architecture, Interior Design, Planning and Construction Managemen . STANDARD FORM 330 (6/2004) PAGE 1 . . PROFESSIONAL DESIGN SERVICES FOR THE HERITAGE PARK AND PARKING GARAGE CITY OF SUNNY ISLES BEACH .. CMF INTERNATIONAl GROUP INC CMF International Group, Inc. Carlos M. Flores, AlA Principal-In -Charge .. CMF INTERNATIONAL GROUP INC CMF International Group, Inc. Flor C. Munoz, RA. Project Manager CMF ARClITfECTIJRE Fred Poey Construction Manager Glantna Moreno, A.I. AutoCAD Operator/ Production/Contract Documents Carlos J. Flores Cost Estimator/ Scheduling . .. eMF INTERNATIONAL GROUP INe CES CIVIL Rudy M. Ortiz, P.E. Managing Principal Jose A. Compres Project Manager/ Civil & Structural Engineering Arjen Bootsman, P.E Senior Mechanical Engineer Jose A. Caraballo Project Engineer/ Civil & Envirorunental Engineering Srikanth V. Gajnla, E.I Project Engineer/ nansportation Engineering ~~ PISTORINO & ALAM STRUCTURAL & MEP SAVINO-MILLER LANDSCAPE ARCH. LANGAN ENGIN. & ENVRO. SERVICES Cristina Gonzalez, P.E Principal Lijian Zhou, P.E Project Manager Mathew E. Meyer, P.E Geotechnical Engineer Daniel R. Grenier, M.E.S Permitting Vmcent D. Varina, P.E Project Manager R.S. Murall, M.S Project Manager/ Sedimentlogy IANGAN Nasir M. A1am, P.E. Principal-In-Charge Barry R. Miller Partner in Charge Tahir Iqbal, P.E. Project Manager Adriana Savino, RLA Project Designer/ Quality Control James Trowbridge Structural Design Engineer Tallta GuUerres Landscape Architectural Designer/Drafting James Smith, P.E. V:P. Electrical Engineer Evguenl Savistky Mechanical Design Engineer ---r.- - - - ~..-!~Ig~~~gGl~~~~:r. r 3n iller Organizational Chart / City ofSwmy Isles Beach / RFQ. No. 07-08-01/ October 10, 2007 CMF International Group, Inc. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each kev person.) NAME: - ROLE IN THIS CONTRACT: Carlos M. Flores. AlA. NCARB. President Registered Architect 14a. YEARS EXPERIENCE - TOTAL: 27 14b. YEARS EXPERIENCE - WITH CURRENT FIRM: 3 16. EDUCATION (DEGREE AND SPECIALlZA TlON): CMF INTERNATIONAL GROUP. INC. 9300 South Dadeland Blvd. Suite 602. Miami. FL.33156 BArch/Interior Design/General Contractor 15. FIRM NAME AND LOCATION (Citv and State): CURRENT PROFESSIONAL REGISTRA TION (STATE AND DISCIPLINE): State of Florida/Architecture/Interior Designer/General Contractor / North Carolina/Architecture OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, A wards, etc.): AWARDS: ORGANIZATIONS: American Institute of Architects - AlA; National Council of Architectural Registration Board- NCARB; Florida Educational Facilities Planner Association-FEFPA; Society of Colleges and University Planners-SCUO; American Association of Airport Executives- AAAE; Airport Consultants Council-ACC 19a( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Brolam, Inc, Warehouse, Hialeah Gardens, Florida 19a(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2007-Architect of Record/ Construction Management 19a(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable):- On going- Projected completion on 4/2007 Responsible for Construction Management. .19a(3) RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Design/build to rebuild warehouse damaged by Hurricane Wilma. The project consists of the Warehouse which includes Shop Maintenance Facilities. reconstruction of the damaged structure and new structural elements, renovation of 8.356 sq. ft. of interior offices located on a second level, new bathrooms. parking areas both inside and outside the building. The scope includes 2 loading docks area. all in a site of 2.43 acres. Provide code compliance as per Florida Building Code. Accessibility upgrades including additional Elevator for compliance with ADA. Replacement of roof structural deck and re-roofing. Building Area of 39,700 SF- The project cost was $2,219.000. - Architect of Record/ Construction Manager: Responsible for Assessing damages by Hurricane Wilma, Prepare Design and Construction Documents for the Reconstruction of the Warehouse and Offices. 19a(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X 19b(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Southridge Community and Aquatic Center. Phase III 19b(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: To be completed 2008-Cost Estimating, A/OC and Construction Manager 19b(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable):- On going- Projected completion on 2008 19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Architecture construction management for the design of a community and Aquatic center. The total structure is 13,369 sq.ft. that will include the community center building with activity rooms, offices' restrooms, lifeguard locker area, snack bar, public bathrooms with showers and locker rooms, aquatic center, covered outdoor seating area, exterior and covered breezeway. The pool area totals 11.977 sq.ft that includes a children's water play pool, a teaching pool, a 25 yard competition pool. A Mechanical Building to house all pool equipment. Site Development that includes parking for the facility. An estimated cost of $5,301,231. CMF is responsible for the Construction Management Services, Cost Estimating, O/A/OC and Construction Administration. 19b(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X . STANDARD FORM 330 (6/2004) PAGE 3 19c( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Bird Road Starbucks Shopping Center, Miami-Dade, Florida - 19cf(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: To be completed 2008-Cost Estimating, AQ/QC and Construction Manager 19c(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable):- On going. Projected completion on 2008 19c(31 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The Bird Road Starbucks Shopping Center is a single story structure with two buildings for a total area of 10,247.71 square feet of retail space and a total site area of 31,300 square feet. This includes parking for 61 spaces, with access to Bird Road and 83'd Avenue. This shopping center will house national franchise such as Starbucks Coffee, Mattress Firm and Quiznos. This building structure will consists of masonry walls, steel joist and light weight concrete roof structure, with steel columns and frames for the impact glass store front windows system. The site work will include all the site drainage, site lighting and landscaping as well as a lift station and force main that extends :y. of a mile, requiring the interaction with FOOT and WASD. 19c(31 RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X 19d( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Dr. Fisher's Office, South Miami, Florida 19di(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2006- Architect of Record / Construction Manager 19di(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicablel:Completed 2006-Responsible for Construction Management. 19di(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Office interiors renovation to include facelift using new materials, casework and lighting system. Provide a multipurpose room, work area with kitchenette, offices, interior renovation to include accessibility for the handicapped, bathroom for the disable and add storage area. The total area of 620 SF - Cost of the project was $82,310. -Architect of Record/Construction Manager: Responsible for assessing, designing office, space planning, construction documents and construction management. .19di(3} RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X 1gej( 1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): 40 Year Certification Roche BobDis' Furniture Store For leora, Inc. Coral Gables, Florida 1gej(21 RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2005- Architect of Record for the Certification. 1gej(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2005- Construction Management. 1gej(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: This building is a two story building. Building needs assessment for a 40 Year Re-Certification with building component such as Structural, electrical. roofing, stucco and paint to be included, and provide a comprehensive report. Area SF - Cost of -Architect of Record / Construction Manager: Responsible for on site visit and verification if all building components including engineering. 1ge(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X 1 9f( 1 } RELEVANT PROJECT - TITLE AND LOCATION (City and State): Sevilla Office Building, 133 Sevilla Avenue, Coral Gables, Florida RELEV ANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2006- Project Management Services/Owner's Representative. RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicablel:- Completion on 2006 19f(21 19f(2) 19f(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: A two story apartment building in downtown Coral Gables built in 1926 to be converted to a smart office building. The building required to be completely reconstructed to meet all the requirements of the Florida Building Code. The building characteristics were to be maintained in order to comply with the historical preservation requirements set forth by the City. The program requirement was to house the corporate offices of a venture capital group with specific functions for all office spaces. The building was to be redesign for accessibility and required a new elevator. The owner required the building to be a smart building with the latest communications technologies available. The project ran into extensive time delays and cost overruns due to unforeseen conditions. Project size of 8450 SF. The cost of the Project is $2,306,800. CMF acted as Project Management and as Owners Representative. . STANDARD FORM 330 (6/2004) PAGE 4 19f(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X . 199( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Chispa Restaurant.11500 NW 4 pt Street, City of Doral, Florida 199(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2006- Project Management/Owners Representative 199(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable):- Completed on 2006 199(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The construction of a free standing two story restaurant with an occupant load of 200, on a site that is 47,907 SF with 90 parking spaces. The restaurant was design to house a bar that sits 50 people, meeting rooms with the latest audio-visual equipment for presentations, and the kitchen with the latest food service equipment. This high end restaurant was designed to satisfy a sophisticated clientele that could find a place for fine dinning and small parties gathering. 199(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X 19h( 1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Homestead Air Reserve Park, Homestead, Florida 19h(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES:- 2005- Sr. Project Manager/ Designer 19h(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable):2005- Responsible for oversight of Construction Administration 19h(3) . 19h(3) RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Architectural/Engineering Services for a Regional Park, scope include Utilities Master plan for the park, the scope verification of the master plan, the design of the Recreation Field Center, multiple soccer fields with bleachers, multiple baseball fields, fields to include lighting and irrigation, picnic shelters, Restrooms/storage building, three parking lots with 268 parking spaces in total and pathways. The project cost Phase I was estimated to be $4,530,000. The overall construction cost for all Phases was $40,000,000.- Sr. Project Manager/Designer: Responsible for site planning and coordination with civil engineering for utilities and traffic constrains. Oversight of preparation of construction documents, coordinate Engineering tears and construction administration overview. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: RELEV ANT PROJECT - TITLE AND LOCATION (City and State): Utilities Master Plan, Homestead Air Reserve Park, Homestead, Florida 19i(1 ) 19i(2) 19i(2) 19i(3) 19i(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2003 - Sr. Project Manager/ Designer RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): N/A RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Architectural/Engineering Services for a Regional Park. Scope Verification of the Master Plan related to all utilities. Resolve pending issues impacting future growth and its surrounding community. The Study included the phased Construction of the park over 20 years. The construction cost of Phase I for this project was $575,000.00, with the overall cost for $3,200,000 dollars. - Sr. Project / Manager/Designer: Responsible for site planning, coordination with civil all engineers tears for all utilities location and coordination of all future needs. Prepare Design Criteria for all documents and coordination with all engineering tears. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: 19j( 1 ) 19j(2) 19j(2) 19j(3) . 19j(3) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Miscellaneous Roofing Consultant, Miami International Airport, Miami, Florida RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2002 -Architect of Record/Principal in Charge RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2002 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Multiple re-roofing, projects for Aviation Dept. buildings: Re-roofing, removal and replacement of electrical and mechanical equipment for: Concourse F; Concourse E Satellite; Bldg.5A (Adm. Chiller Bldg.) - 21,000 SF; Bldg.32 (Chiller System Bldg.) - 16,000 SF; Bldg.60 &60A -100,000SF; Numerous building at a total Cost of $9.5 million dollars - Architect of Record: Responsible for surveying the buildings, overseeing the preparation of contract documents, and providing construction administration overview of the project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 5 19k(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State}:Women's Park, Women's History Gallery, Miami-Dade County Park and Recreation, Miami, Florida . 19k(2) 19k(2) 19kk3) 19k(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2001 - Architect of Record/Project Architect/Designer RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2001 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The project consisted of a building dedicated to exhibit of prominent women of the community, it included a reception area, a lobby/main exhibit area, a video/projection room, a multipurpose room, food preparation Room, administration work area and the curator's office, storage room for props and exterior storage facility for use of the park maintenance, and the exterior terrace for outdoors functions. Area of 6,000.SF - Project cost of $1,000,000. - Principal in charge: Responsible for surveying the property, preparing a program for the Gallery Committee, selection of building site location, design of building, overseeing the preparation of construction documents, and Construction administration overview of the project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: 191(1 ) 191(2) 191(2) 191(3) 191(3) . 19m(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Miscellaneous Roofing Consultant, Miami International Airport, Miami, Florida RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2002 -Architect of Record/Principal in Charge RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2002 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size. cost etc.) AND SPECIFIC ROLE: Multiple re-roofing, projects for Aviation Dept. buildings: Re-roofing, removal and replacement of electrical and mechanical equipment for: Concourse F; Concourse E Satellite; Bldg.5A (Adm. Chiller Bldg.) - 21,000 SF; Bldg.32 (Chiller System Bldg.) - 16,000 SF; Bldg.60 &60A -100,000SF; Numerous building at a total Cost of $9.5 million dollars - Architect of Record: Responsible for surveying the buildings, overseeing the preparation of contract documents, and providing construction administration overview of the project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: RELEVANT PROJECT - TITLE AND LOCATION (City and State): Royal Palm IShorecrest Crown Plaza Hotel Miami Beach, Florida 19m(2) 19m(2) 19m(3) 19m(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES; 2002 - Architect of Record (Historic Preservation) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2002 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: A 400 bed hotel is a combination of the Restoration of two existing Art Deco hotels and two new towers addition. The developer for The Royal Palm Hotel was allowed to record, demolish and reconstruct to the building to its original likeness. The project included meeting rooms, assembly areas, parking garage and all amenities of a five star hotel would have. The construction cost $63,000,000. - Architect of Record (Historic Preservation): Responsible for recording of all building elevations, floor plans, details. Materials and methods of construction was determined and recorded. Preparation of construction documents and construction administration as it relates to historic preservation. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: 19n(1) 19n(2) 19n(2) 19n(3) . 19n(3) RELEVANT PROJECT - TITLE AND LOCATION (City and State):Miami International Airport, GTI Holding 10ts/Taxi Cafeteria, Miami, Florida. RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES:1999 - Architect of Record RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): N/A RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: This project consisted of a Shuttle buses and taxi cab control building, bus terminal shelters, the cafeteria with a full kitchen, loading dock, vending area, rest/dining area, and bathrooms. Project includes Amenities Buildingsl taxi Cab Cafeteria (12,000 SF). Project with a Cost $ 5 Millions - Principal in charge/Architect of Record: Responsible for preparing a program, site planning and coordination of civil engineering for traffic constraints. Design of all amenities, building structures as well as design, overseeing preparation of construction documents and overview of Construction administration of the project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 6 e 190( 1) RELEV ANT PROJECT - TITLE AND LOCATION (City and State); V.A..Hospital Incinerator Building, Veteran Hospital, Miami, Florida. 190(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 1985 Architecture I Construction Management 190(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 1985 190(3) RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: This project consisted in building a new Steel Structure construction of an area of 5800 SF to house two incinerators and provide access from the loading dock to the incinerator. The steel structure is of structural I beams as columns with steel joists and metal deck with concrete. A cost of$---------. The relevance of this project is that building was located around an existing incinerator, adding a new incinerator and still maintain its function while structure being constructed. As Individual experience Carlos M.Flores acted as Construction Manager and was responsible for the day to day activities of this project. 190(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: 19p(1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State) Pan American Hospital Medical Building, Miami, FL. 19p(2) 19p(2) 19p(3) 19p(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 1987 - Design IBuild ProjectlConstruction Management. RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 1987 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: This 5 story building with 8000 SF per floor and a total construction area of 24,000 SF consists of a facility of medical offices, treatment rooms, radiology department.A cost of $---------.As individual experience Carlos M. Flores acted as Designer and Construction Manager and was responsible for the day to day activities of this project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: RELEVANT PROJECT - TITLE AND LOCATION (City and State): Palmetto General Hospital Medical Building, Miami, Florida 19q( 1) e19q(2) 19q(2) 19q(3) 19q(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES:1981 - Project Management for Design IConstruction Document phases. RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable); N/A RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Design and Construction documents for a free standing medical office building approx.132,000 SF providing medical offices, including radiology and out patient surgical facilities. A cost of $_______ As Individual experience Carlos M. Flores acted as Designer and Project Manager during design and contract document phases. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: RELEVANT PROJECT - TITLE AND LOCATION (City and State);North West Dade Community Mental Health - Ambulatory Crisis Mental Unit, Miami, FL. 19r(1 ) 19r(2) 19r(2) 19r(3) 19r(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 1987 - Design Build I Construction Management RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable); 1987 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Design IBuild project to provide a crisis unit outside of a hospital setting (This was a departure form of the required hospital setting for certification). This was the first unit to be certified to provide care for the mentally ill in a crisis out side a hospital. Approx. area ------------; and a cost of $--_____________. As Individual experience Carlos M. Flores acted as Design and Construction Manager for this project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: RELEVANT PROJECT - TITLE AND LOCATION (City and State): Baptist Hospital Outpatient Clinic, Miami, Florida. 19s(1 ) 19s(2) .9S(2) 19s(3) 19s(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 1994 - Design Buildl Construction Manager RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable); 1994 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Designl Build project to provide an outpatient Facility for Baptist Hospital. Area of 4200 SF. A cost of $_________000 As individual experience Carlos M. Flores acted as Design and Construction Manager for this project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 7 e 19t( 2) 19t(1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Sheridan Cardiovascular Healthcare Clinic, Miami, Florida RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 1988- Construction Management 19t(2) 19t(3) 19t(3) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 1988 RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Construction of an Area of 14,000 SF. A cost of $--------- Outpatient Cardiovascular Unit for a cardiology group. As individual experience Carlos M. Flores served as Design and Construction Manager for this project RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: 19u(1) RELEVANT PROJECT - TITLE AND LOCATION (City and State) Miami Cardio Pulmonary Institute, Miami, Florida. 19u(2) 19u(2) 19u(3) 19u(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: Expert Consultant RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2004 RELEVANT PROJECT. BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Expert consultant to complete the construction of a medical facility (approx 8,100 SF) was in trouble and required to have the facility reviewed and provide solutions to comply with all Code requirements and AHCA. Identify all deficiencies that had not been addressed and provide solutions, such as the replacement of an inadequate nurse call system, corrections to the A/C system, corrections to the building structure, fire proofing repairs, electrical and Code compliance repairs in the Catheterization Lab/operation room, in the patient rooms, and the nuclear room (Phillip ADAC), ADA code compliance requirements in violation. A Cost of $-- Carlos M. Flores served as an expert consultant to the group's attorney for all litigation issues. This facility was reviewed by AHCA and received an exception certificate from AHCA because it was 100% owned by physicians. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: . . STANDARD FORM 330 (6/2004) PAGE 8 . 12. 13. 14a, 14b. 15. 16. 17. 18. . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.; NAME: Flor C. Munoz. R.A. ROLE IN THIS CONTRACT: Project Manager YEARS EXPERIENCE - TOTAL: 31 YEARS EXPERIENCE. WITH CURRENT FIRM: 1 year FIRM NAME AND LOCATION (City and State): CMF INTERNATIONAL GROUP, INC. 9300 South Dadeland Blvd., Suite 602, Miami, Florida 33156 EDUCATION (DEGREE AND SPECIALlZA TlON): BSARCH, ARCHITECTURE CURRENT PROFESSIONAL REGISTRA TION (STA TE AND DISCIPLINE).' Architect Registration for Florida and New York-ARCHITECTUR OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, A wards. etc.): AWARDS: Minority Service Firm of the Year 1992, U.S. Department of Commerce ORGANIZATIONS: Board Member. V.P. Penalver Clinic, Miami, Florida 19a( 1 ) RELEVANT PROJECT. TITLE AND LOCATION (City and State): Planning for a Parking Structure for the Miami-Dade Aviation Department, Miami, Florida. 19a(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: Completed 2005 - MDAD Project Manager, Planning Division 19a(2) RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): NIA 19a(3) RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: This Parking Facility Structure is planned to be located on the North East area of Building 100, with direct entrance to this site and access to NW 36 Street. This new facility would have a capacity of a minimum 250 cars. Spaces and the alternate option of increasing capacity at bid process up to 500 car spaces. The facility will consist of providing a minimum required 100 spaces for adjacent building and the additional spaces would be used for future tenants' expansion of personnel. This facility would consist of a reinforced concrete structure with three story heights and would be designed to be in full compliance with Florida Building Code and NFPA - MDAD Project Manager Responsible to prepare Study, engineering coordination, review for compliance with code, coordinate cost estimating and scheduling. 19a(3) RELEVANT PROJECT - BRIEF DESCRIPTION. Check here if project performed with current firm: 19b( 1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Cell Phone Hold Facility for 60 cars. Miami-Dade Aviation Dept.Miami,Florida. 19b(2) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: Completed 2005- MDAD Project Manager, Planning Division 19b(2) 19b(3) 19b(3) e9C(1) RELEVANT PROJECT. YEAR COMPLETED. CONSTRUCTION (If applicable): Completed 2005 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The site of this project is located on the South East Entrance to Building SA (formerly Eastern Airlines Executive Facility). This project was designed to provide sixty parking spaces having drivers the option to await calls from arriving passengers at the airport without having to drive all around the terminal for several times before encountering the passenger. This service provide rapid passenger pick up time, ease access to the terminal by reducing traffic and a saving of energy. This project was planned and built with Aviation in-house personnel.- MDAD Project Manager responsible for coordination of engineering disciplines and trades such as civil, electrical, paving, stropping, landscaping, signage, cleaning drainage form water accumulated in the access area. Planning and all required work was completed as expected in six weeks prior the holiday season of November of 2005. RELEVANT PROJECT - BRIEF DESCRIPTION. Check here if project performed with current firm: RELEVANT PROJECT - TITLE AND LOCATION (City and State): Miami International Airport- Building 100. Planning Study Miami- Dade Aviation Department, Miami, Florida. 19c12 RELEVANT PROJECT. YEAR COMPLETED. PROFESSIONAL SERVICES: Completed 2005 _ MDAD Project Manager, Planning Division STANDARD FORM 330 (6/2004) PAGE 9 19c(2) 19c(3) . RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable); NIA RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Built out of approximately 15,000 square feet to be completed after leasing, Refurbish approximately 12,000 square feet to be ready for Occupancy. Review Life Safety System to comply with NFPA for Smoke Evacuation and Sprinkler System. Add new Air Handler unit and replace AIC existing units. Cost estimate was over 5. Million Dollars at the end of 2005 - Project Manager, Planning Division. Responsible for the planning study to identify objectives and pending issues, and include those in this program to complete deficiencies, to obtain a permanent certificate of occupancy in order to be able to fully occupy the building. 19c(3) RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm . . STANDARD FORM 330 (6(2004) PAGE 10 . 12. 13. 14a. 14b. 15. 16. 17. 18. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) NAME: Fred Poey ROLE IN THIS CONTRACT; Construction Manager YEARS EXPERIENCE - TOTAL: 23 YEARS EXPERIENCE - WITH CURRENT FIRM: One year FIRM NAME AND LOCATION (City and State): CMF INTERNATIONAL GROUP INC. 9300 South Dadeland Boulevard, Suite 602. Miami, FL.33156 EDUCA TION (DEGREE AND SPECIALlZA TION): BS Mechanical Engineer CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE): OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, A wards, etc.): AWARDS: ORGANIZATIONS: 19a(2) 19a(3) .19a(3) 19a(1) 19a(2 RELEVANT PROJECT - TITLE AND LOCATION (City and State): Brolam, Inc. Warehouse. Hialeah Gardens, Florida RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2007 - Construction Manager RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 On going- Projected completion on 4/2007 RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Designlbuild to rebuild warehouse damaged by Hurricane Wilma. Reconstruction of the damaged structure and interior office spaces. Provide code compliance as per Florida Building Code, Accessibility upgrades including additional Elevator for compliance with ADA. Replacement of roof structural deck and re-roofing. Building Area of 39,700 SF.- The project cost was $2,219,000. -Construction Manager: Responsible for Cost Estimating and Scheduling; Responsible for contractors and all activities on job sites, including scheduling, monitoring, and inspecting all work from start to finish; Construction supervision, including accurate takeoffs, estimating, budgeting, contracting, purchasing, and invoicing; Maintain budgets, process invoices, and control overhead costs. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X 19b(1 ) RELEVANT PROJECT - TITLE AND LOCATION (City and State): Sevilla Office Building for the Astri Group, LLC. Coral Gables, Florida. 19b(2) 19b(2) 19b(3) 19b(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 - Project Manager RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2006 RELEV ANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: A two story apartment building in downtown Coral Gables built in 1926 to be converted to a smart office building. The building required to be completely reconstructed to meet all the requirements of the Florida Building Code. The building characteristics were to be maintained in order to comply with the historical preservation requirement set forth by the City. The program requirement was to house the corporate offices of a venture capital group with specific functions for all office spaces. The building was redesigned for accessibility and required a new elevator. The owner required the building to be a smart building with the latest communications technologies available.. Project size 8450 Sq. Ft. The cost of the project is private equity investment firm, in Coral Gables Managed and coordinated contracts with contractors not working directly under the General Contractor, including:Lace Foodservice,Telesound Systems. ADT Fire and Security, Camilo Furniture, Restoration Arts, and others. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X RELEVANT PROJECT - TITLE AND LOCATION (City and State): Chispa Restaurant for the Astri Group, LLC, City of EI Doral, Florida 19c(1 ) 19c(2) 19c(2) 19c(3) . 19c(3) RELEVANT PROJECT - YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 - Project Manager RELEVANT PROJECT - YEAR COMPLETED - CONSTRUCTION (If applicable): 2006 RELEVANT PROJECT - BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Chispa Restaurant project consists of the construction of a free standing two story restaurant, a flne dining facility with an occupant load of 200, on a site that is 47,807 sq. ft. with 90 parking spaces. The restaurant was design to house a bar that sits 50 people, meeting rooms with the latest audio- visual equipment for presentations, and the kitchen with the latest food service equipment. The cost of the project is $5,459,661.00.- Project Manager: Responsible for construction supervision of this project. RELEVANT PROJECT - BRIEF DESCRIPTION - Check here if project performed with current firm: X STANDARD FORM 330 (6/2004) PAGE 11 e e . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Nasir M. Alam, P.E. Principal-In-Charge a. TOTAL I b. WITH CURRENT FIRM 26 26 15 FIRM NAME AND LOCATION (City and State) Pistorino & Alam Consulting Engineers, Inc., Miami, Florida 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) University of Miami, Coral Gables and Florida International Florida Registered Professional Engineer University, Miami- Graduate level courses including State of Florida P.E, Number 36954 Advanced Structural Analysis, Reinforced Concrete Design, Structural Engineering 1 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Past president and one of the pioneers of Florida Structural Engineers Association (FSEA). Past Vice president of Florida Structural Engineers Association (FSEA) Past President of the Florida Engineering Society (FES), Miami Chapter. Past Vice-President of the Florida Engineering Society (FES), State Level. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Miami Office and Garage PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Principal n/a a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm Design of six-story building and six-story parking garage preparation of floor plans, structural analysis, design of the structural systems in compliance with South Florida Building Code. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Miami Metrorail Station Parking Garage, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Principal n/a b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm The desing of all on-site and off-site improvements including a new internconnect fire water main servicing the local public areas adjacent to the South Miami Metro Rail Station. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Axis Condominium Buildings PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Principal n/a c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm Structural Design Criteria for two 40 stories condominium towers and eight story parking garage, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Baptist Hospital Parking Garage and Dietary Expansion Project, PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Miami, Florida Principal n/a d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE cg] Check if project performed with current firm Provided design criteria and construction phase services for the parking garage. Existing court-yeard of the cafeteria will be enclosed by a new structure. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Miami Police Station, South Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Principal n/a e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed With current firm Structural and Civil Engineerign design of major addition to the existing Police Station of City of South Miami, STANDARD FORM 330 (6/2004) Page 2 I. . e E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Tahir Iqbal, P.E. Project Manager a. TOTAL I b. WITH CURRENT FIRM 27 17 15. FIRM NAME AND LOCATION (City and State) Pistorino & Alam Consulting Engineers, Inc. Miami, Florida 33143 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) University of Michigan, Ann Arbor, Michigan 1983 State of Florida, Florida Registered Professional Master of Science in Structural Engineer EngineerRegistration PE#: 48061 N.E.O. Engineering University, Karachi, 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Structural:Structural dynamics, structural analysis, prestressed concrete design, advanced steel and concrete design and, design of bridge structures, Computers:Knowledge of computer aided design and drafting (AUTOCAO) and application of structural analysis computer programs and knowledge of Primavera Program. SAP. 90, ETAB for High Rise Buildings Design. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Miami Office and Garage PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Project Manager a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Design of six-story building and six-story parking garage preparation of floor plans, structural analysis, design of the structural systems in compliance with South Florida Building Code. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Axis Condominium Buildings PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Project Manager b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Structural Design Criteria for two 40 stories condominium towers and eight story parking garage. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Baptist Hospital Parking Garage and Dietary Expansion Project, PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Miami, Florida Project Manager c. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Provided design criteria and construction phase services for the parking garage. Existing court-yeard of the cafeteria will be enclosed by a new structure. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Onyx 1 - Condominium Building PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Project Manager d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Provided design criteria and construction phase services for the condominium building and parking garage, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Miami Metrorail Station Parking Garage, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Project Manager e, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm The desing of all on-site and off-site improvements including a new internconnect fire water main servicing the local public areas adjacent to the South Miami Metro Rail Station. STANDARD FORM 330 (6/2004) Page 3 - . e E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE James Trowbridge Structural Design Engineers a. TOTAL I b;ITH CURRENT FIRM 33 15. FIRM NAME AND LOCATION (City and State) Pistorino & Alam Con.sulting Engineers 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Ohio University, MS, 1975, Civil/Structural Engineering Professional Engineer, Florida, 2001 Ohio University, BSCE, 1973, Cum Laude Professional Engineer, Virginia, 1997 Professional Engineer, Kentucky, 1996 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers, Member International Concrete Repair Institute, Member Florida Engineering Society, Member Florida Structural Engineers Association, Member 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Building 10 - Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Project Manager a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm The project consists of three structures: a new 6 story condominium building, an existing 7 story building and a new 1.5 story cabana (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The Steam Plant and Railroad Apartments, Key West, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Structural Engineer b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm Performed Threshold Inspections for the Steam Plant and Railroad Apartments during construction, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Greater Cincinnati, Airport, Children's Hospital, University of PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Cincinnati Structural Engineer n/a c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Structural design of 8 large, multilevel post-tensioned concrete parking garages. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City Center Outdoor Plaza PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Structural Engineer n/a d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE o Check if project performed with current firm Design of a new monumental stair at a city center outdoor structural plaza. Design included removal of an old escalator and intill of escalator openings, and code review of stair and guardrail layout and details (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Historic Church Addition PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Structural Engineer n/a e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm Structural design of a complex, three story addition of classrooms and parish hall to existing church on a diffuclt hillside site. STANDARD FORM 330 (6/2004) Page 4 e . . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12, NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE James Smith, P.E. V.P. of Electrical Dept./Engineer a. TOTAL I b. WITH CURRENT FIRM 48 10 15. FIRM NAME AND LOCATION (City and State) Pistorino and Alam Consulting Engineers, Inc, 16. EDUCATION (Degree and Specialization) 17, CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BBA Management- State of Pennsylvania 1973 PE # 20222 Florida International University, Miami, FI 1979 State of Florida 1974 PE # 20196 Engineering Practice Diploma- State of Kentucky 1974 PE # 9804 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) National Fire Protection Association (NFPA) Illuminating Engineering Society (IES), S,E,Florida President (1989-1990) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED A99-PARK-01 PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Electrical and Fire N/A a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm All Electrical and Fire Protection Work as specified in the Miami Dade Parks and Recreation Department. Verification of all electrical services pertaining to the recreation building, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Tropical Estates Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Electrical Engineering N/A b, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed With current firm Review documents, coordination with the Architect and the contractors, Permitting and installation assistance. Construction Phase Support (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Brentwood Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Electrical Engineering N/A c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed With current firm Work included Programming and Schematic Design, Design Development, Construction Documetns, Bidding Award Process and Administration of Construction. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Continental Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Electrical Engineering N/A d, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm Work included Programming and Schematic Design, Design Development, Construction Oocumetns, Bidding Award Process and Administration of Construction. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Title 5 PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Professional 5 Construction5 e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Oescription5 STANDARD FORM 330 (6/2004) Page 5 e . . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Evgueni Savistky Mechanical Design Engineer a. TOTAL I b.;ITH CURRENT FIRM 27 15. FIRM NAME AND LOCATION (City and State) Pistorino & Alam Consulting Engineers, Inc" Miami, Florida 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida International University Florida State Registered Professional Engineer Engineering Review Course 1993-1994 License #0052760 Miami Dade Community College 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) NCEES Certification #0348723 (for nationwide licensure) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED A99-PARK-01 PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Mechanical Engineer N/A a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm All Mechanical and Plumbing Work as specified in the Miami Dade Parks and Recreation Department. Verification of all electrical services pertaining to the recreation building, (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Tropical Estates Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Mechanical Engineer N/A b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Review documents, coordination with the Architect and the contractors. Permitting and installation assistance. Construction Phase Support (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Brentwood Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Mechanical Engineer N/A c, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Work included Programming and Schematic Design, Design Development, Construction Documetns, Bidding Award Process and Administration of Construction. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Continental Park PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Mechanical Engineer N/A d, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Work included Programming and Schematic Design, Design Development, Construction Oocumetns, Bidding Award Process and Administration of Construction. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm STANDARD FORM 330 (6/2004) Page 6 1-- .i/ Wh 14a. 14b. 15. 16. 17. 18, E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) NAME: Barry R. Miller ROLE IN THIS CONTRACT: Partner in Charge YEARS EXPERIENCE - TOTAL: 27 YEARS EXPERIENCE - WITH CURRENT FIRM: 14 FIRM NAME AND LOCATION (City and State): Savino & Miller Design Studio, 12345 N.E. 6th Avenue, A North Miami, Florida EDUCATION (DEGREE AND SPECIALlZA nON): Bachelor of Landscape Architecture, Master of Arts in Urban & Regional Planning CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE): FL LA 866 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.): American Society of Landscape Architects Merit Award American Institute of Architectural Landscape - Architect of the Year Award American Society of Landscape Architect Miami Chapter - past President University of Miami Campus Plan Competition Grand Prize 19. RELEVANT PROJECTS 19a(1) 19a(2) 19a(2) 19a(3) _9a(3) TITLE AND LOCATION (City and State): South Point Park, Miami Beach, Florida YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Site Analysis, Schematic Design, Design Development & Construction Documents including mitigation and transplanting plan of the Planting Plan and Irrigation of a 19-acre park located in the southern tip of Miami Beach at the entrance of Government Cut. The park was designed by Hargreaves & Associates. Cost: $20 Million Partner in Charge BRIEF DESCRIPTION - Check here if project performed with current firm: TITLE AND LOCATION (City and State): Homestead Bayfront Park, Homestead, Florida 19b(1) 19b(2) 19b(2) 19b(3) 19a(3) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 YEAR COMPLETED - CONSTRUCTION (If applicable): BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Master Planning for a 23-acre park located in Homestead, Florida. Scope included the re-design of the access to the park, the organization of the parking and circulation, tapping new opportunities for recreation activities and re-organizing existing activities. Homestead Bayfront Park is one of the five Miami-Dade County Heritage parks. The design calls for sustainable design solutions and restoration of green space into a biodiverse ecological habitat. Estimated Cost: $18 Million BRIEF DESCRIPTION - Check here if project performed with current firm: TITLE AND LOCATION (City and State): Belle Isle Park, Miami Beach Belle Isle, Venetian Islands, Miami Beach, Florida 19c(1) 19c(2) 19c(2) 19c(3) _ 19c(3) YEAR COMPLETED - PROFESSIONAL SERVICES: 2002 YEAR COMPLETED - CONSTRUCTION (If applicable): Under construction BRIEF DESCRIPTION (Brief scope, size. cost etc.) AND SPECIFIC ROLE: Schematics through Construction Administration of a 2-acre park in Miami Beach. Belle Isle is the "Central Park" to Belle Isle. It is surrounded by high rise condominiums. It also acts as the gateway to the Venetian Islands from Miami Beach. Belle Isle Park, located on the only natural island of the Venetian Islands between Miami and Miami Beach, is a major open space surrounded on three sides by high-density condominium buildings, and Venetian Causeway to the north. The space offered no walkways or large open spaces for play, but was mostly used by residents to walk the dogs. SMDS was asked to create a plan to attract more residents to use the park, and responded with a plan which provided for a range of recreational opportunities. A large elliptical open space formed by a walkway, coupled with a "Bark Park" and numerous small paved seating areas - located by each of the park entrylstreet crosswalks - allows for both passive and active play activities. Numerous existing trees and palms were preserved or transplanted to create and define the park's spaces. Cost: $450,000 BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) .2. Wh 14a. 14b. 15, 16. 17. 18. NAME: Adriana Savino-Miller ROLE IN THIS CONTRACT: Project Designer, Quality Control YEARS EXPERIENCE - TOTAL: 22 YEARS EXPERIENCE - WITH CURRENT FIRM: 14 FIRM NAME AND LOCATION (City and State): Savino & Miller Design Studio, 12345 N.E. 6th Avenue, A, North Miami, Florida EDUCATION (DEGREE AND SPECIALIZATION): Architecture, Master of Architecture, Certificate of Urban Design CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE): FL AR 14444 OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): University of Miami Campus Plan Competition Grand Prize American Institute of Architect-Landscape Architect of the Year Award 19. RELEVANT PROJECTS 19a(1) 19a(2) 19a(2) 19a(3) .9a(3) 19b(1) 19b(2) 19b(2) 19b(3) 19b(3) TITLE AND LOCATION (City and State): Miami-Dade Metro Zoo Master Plan, Miami-Dade, Florida YEAR COMPLETED - PROFESSIONAL SERVICES: 2004 YEAR COMPLETED - CONSTRUCTION (If applicable): on going BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: As the Landscape Architect and Master Planner for the Metro ZoolRichmond Naval Air Station Master Plan, SMDS performed an extensive site analysis of the entire four square mile project area, including all environmental components (geology, hydrology, vegetation, soils, etc.) historical development patterns and context, land use, ownership, and analysis of the existing zoo facilities. The analysis led to the creation of overlay maps indicating opportunities and constraints to future zooltheme park expansion. The final Master Plan proposes the location of a new hotel, amusement park, aquatic center, and family entertainment facilities. BRIEF DESCRIPTION - Check here if project performed with current firm: TITLE AND LOCATION (City and State): Homestead Bayfront Park, Homestead, Florida YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 YEAR COMPLETED - CONSTRUCTION (If applicable): BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Master Planning for a 23-acre park located in Homestead, Florida. Scope included the re-design of the access to the park, the organization of the parking and circulation, tapping new opportunities for recreation activities and re-organizing existing activities. Homestead Bayfront Park is one of the five Miami-Dade County Heritage parks. The design calls for sustainable design solutions and restoration of green space into a biodiverse ecological habitat. Partner in Charge Estimated Cost: $18 Million BRIEF DESCRIPTION - Check here if project performed with current firm: TITLE AND LOCATION (City and State): Belle Isle Park, Miami Beach Belle Isle, Venetian Islands, Miami Beach, Florida 19c(1) 19c(2) 19c(2) 19c(3) . 19c(3) YEAR COMPLETED - PROFESSIONAL SERVICES: 2002 YEAR COMPLETED - CONSTRUCTION (If applicable): Under construction BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Schematics through Construction Administration of a 2-acre park in Miami Beach. Belle Isle is the "Central Park" to Belle Isle. It is surrounded by high rise condominiums. It also acts as the gateway to the Venetian Islands from Miami Beach. Belle Isle Park, located on the only natural island of the Venetian Islands between Miami and Miami Beach, is a major open space surrounded on three sides by high-density condominium buildings, and Venetian Causeway to the north. The space offered no walkways or large open spaces for play, but was mostly used by residents to walk the dogs. SMDS was asked to create a plan to attract more residents to use the park, and responded with a plan which provided for a range of recreational opportunities. A large elliptical open space formed by a walkway, coupled with a "Bark Park" and numerous small paved seating areas - located by each of the park entrylstreet crosswalks - allows for both passive and active play activities. Numerous existing trees and palms were preserved or transplanted to create and define the park's spaces. Cost: $450,000 BRIEF DESCRIPTION - Check here if project performed with current firm: STANDARD FORM 330 (6/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) .12. 3. NAME: Talita Gutierres ROLE IN THIS CONTRACT: Landscape Architectural DesignerJDrafting 14a, YEARS EXPERIENCE - TOTAL: 9.5 14b. YEARS EXPERIENCE - WITH CURRENT FIRM: 1.5 15. FIRM NAME AND LOCATION (City and State): Savino & Miller Design Studio, 12345 N.E. 6th Avenue, A, North Miami, Florida EDUCATION (DEGREE AND SPECIALIZATION): Architecture, Urbanism, & ILandscape Architecture, Universidade MacKenzie, Sao Paolo, Brazil 16. 17, CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE): N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards, etc.): Fia Flora Exhibition Landscape Architecture Award 2004: Jardim do Fogo 19. RELEVANT PROJECTS 19a(1) TITLE AND LOCATION (City and State): South Point Park, Miami Beach, Florida 19a(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19a(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 19a(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: Site Analysis, Schematic Design, Design Development & Construction Documents including mitigation and transplanting plan of the Planting Plan and Irrigation of a 19-acre park located in the southern tip of Miami Beach at the entrance of Government Cut. The park was designed by Hargreaves & Associates. Cost: $20 Million Partner in Charge 19a(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 9b(1) TITLE AND LOCATION (City and State): The Ritz Hotel, Miami Beach, Florida 19b(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19b(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 2008 19b(3) BRIEF DESCRIPTION (Brief scope, size. cost etc.) AND SPECIFIC ROLE: The Master Plan composes the program elements of Hotel, Time Share Villas, Clubhouse, and Men's Club into a comprehensive open space system, allowing continuous circulation through landscaped courtyards, pool decks, and palm meadows. SMDS provided complete Master Plan services and design development for the open space system, including the site mater planning, vehicular circulation and parking, pedestrian walks, pools, pool decks, and garden spaces. A detail of typical villas "cluster" illustrates the design intent to respect traditionallcultural forms and customs. From Schematics through Construction Documents. 19b(3) BRIEF DESCRIPTION - Check here if project performed with current firm: 19c(1) TITLE AND LOCATION (City and State): Miami Beach Jewish Community Center (JCC), Miami Beach, Florida 19c(2) YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 19c(2) YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 19c(3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE: The JCC campus design responds to the center's desire to provide a diverse program of outdoor activities. The various courtyards, water features, and fields throughout the project allows for study, socializing and play throughout the campus at the same time. SMDS designs for the landscape reflect the architecture's contemporary style, with emphasis on simplicity, attention to detail and creating an enhanced indoor to outdoor spatial relationship. Master Plan, Schematic Design Plans, Design Development, Construction Documents. Project Manager. 19c(3) BRIEF DESCRIPTION - Check here if project performed with current firm: . STANDARD FORM 330 (6/2004) PAGE 3 - _ e E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Rudy M. Ortiz, P.E., President 13. ROLE IN THIS CONTRACT Managing Principal 14, YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 20 6 15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc. - Miami, Florida (Headquarters) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., (Civil Engineering) 1983; University of New York Professional Engineer - FL, NY 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) American Water Works Association (A WW A) Florida Engineer Society (FES) National Society of Professional Engineers (NSPE) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miramar Roadway Infrastructure Project: Miramar, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) N/ A 2007 a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X ] Check If project performed with current firm Principal providing services in construction management and construction inspection for activities throughout the southern hal f of the City of M iramar. The project consists of the installation of all the water, sewer and drainage, as well as the construction of a lift station and over 5 miles of roadway resurfacing. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FEMA-DORM Stormwater Reduction Program, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida 2006 2006 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ X] Check if project performed with current firm Project Manager for the $400 million stormwater and drainage reduction program, overseeing a staff of resident engineers, senior inspectors and inspectors. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Infiltration/Exfiltration/lntlow Program: Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2001 2001 (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc) AND SPECIFIC ROLE [X] Check If project performed with current firm C. Program manager for the $250 million Infiltration/Exfiltration/lnflow Program in Miami-Dade County, Florida. Mr. Ortiz was responsible for leading a staff of engineers, construction managers, inspectors, consultants and other professionals in the construction of system wide sanitary sewer improvements. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED New York City Department of Environmental Protection, New York PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Citv, NY 1997 (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc) AND SPECIFIC ROLE [ ] Check If project performed with current firm d. Project Manager responsible for the construction management of a $15 million, 50,000 feet of water distribution lines in New York City, ranging from 8-inch to 48-inches in diameter, including reconstruction and installation of water and wastewater service laterals. Mr. Ortiz' duties included contract administration, review and approval of change order, shop-drawing review, specification review, approval of progress payments, and supervision of full-time on-site field engineers and inspectors. This work also involved the supervision of street resurfacing and overlays, sidewalk improvements, street markings and lighting (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pump Station Improvement Program, Miami-Dade Water and sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) DeDartment: Miami-Dade County, Florida 1999 1999 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [X] Check If project performed With current firm e. Program manager for the Planning, Designing, and Engineering group on Miami-Dade County's $250 million Pump Station Improvement Program, as part of the County's $1 billion Program Management Team. Mr. Ortiz directed the activities of assistant program managers, and other Senior Engineers, in the planning, design, permitting, construction administration, and certification of more than 600 pump stations and 100 miles of force mains. STANDARD FORM 330 (6(2004) PAGE 1 e . . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jose A. Com pres, P.E., Project Engineer 13. ROLE IN THIS CONTRACT Structural Engineer 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 11 4 months 15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc. - Miami, Florida (Headquarters) 16. EDUCATION (DEGREE AND SPEC/ALlZA nON) B.S., (Civil Engineering), Pontifica Universidad Catolica Madre y Maestra, 1994 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer - FL- Structural/Civil MBA, (Civil Engineering), Pontifica Universidad Catolica Madre y Maestra, 200 I Accounting Technology, Universidad Oominicana O&M, 1996 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, Miami Dade Waste Water Master Plan, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) Water & Sewer Department, Florida 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check il project performed With current firm a. Mr. Compres as Project Manager is currently providing services in an effort to develop Remedial Action Plans for approximately 350 Pump Stations. Mr. Compres has worked very diligently with the staff to create the inspection criteria. This information retrieved from the field will is critical in developing the Remedial Action Plan. This information will help upgrade each individual pump station and make them compliant with the 1 O-Hr operating criteria. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED General Director, Conemco Engineering Dominican Republic PROFESSIONAL SERVICES I CONSTRUCTION (II applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check il project performed with current firm - Contractor of Santiago de Los Caballeros Water and Sewer Department (CORAASAN) including: sewer lines, water mains, concrete manholes for 52 inches water conduction lines. b. - Project management of more than 20 Condomium projects in the City of Santiago, Dominican Republic. - Project management on a 38 hectares land development project including potable mains, earthwork, streets, culverts, canalization, surveying and permitting. - Structural design for: More than 200 projects among them: Two story houses, four Floor masonry and concrete buildings, water deposits, pools, contention walls, steel trusses, pedestrian bridge, parking lots, etc. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Engineer, Corporacion de Asfalto, Dominican Republic PROFESSIONAL SERVICES 1 CONSTRUCTION (II applicable) 1998 (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check II project performed with current firm - Project management for a 30 Kilometers mountainous roadway (Villa Bao- La Cuesta. San Jose De Las Matas, Santiago, c. Dominican Republic.) including technical control of materials, equipment and optimization. - Project Management of an Airport runway Rehabilitation. (Aeropuerto Internacional del Cibao), 1997. Earthwork, equipment control, specification and budget control. - Project Management of Playa Oorada Golf Club (Puerto Plata, Dominican Republic). Rehabilitation of all roads of the complex. Including earthwork, drainage, paving and grading control. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Water Distribution Department Director, Santiago, Dominican Republic PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) 1995 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check il project performed with current firm d. -Director of a 600,000 people Water Distribution system, with 12 distribution Tanks, 8 Pump stations, 2 water treatment plants. Coordinate and control the appropriate operation, continuous service, maintenance, repairs, with the minimum loss. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Field Engineer, Santiago, Dominican Republic PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 1994 STANDARD FORM 330 (6/2004) PAGE 2 - e _ (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check If project performed with current firm Managed construction sites and crews for different tasks in the construction for 2,000 people, 150,000 SF Theater (Teatro Regional Del Cibao). STANDARD FORM 330 (6/2004) PAGE 3 e . . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jose A. Caraballo, Project Engineer 13. ROLE IN THIS CO TRAC Civil & Environmental Engineering EA SE E C a TOTAL b. WITH CURRENT FIRM 5 3 15. FIRM NAME AND LOCATION (Citrand State) CES Consultants, Inc. - Miami, Florida (Headquarters) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., (Environmental Engineering) 2002; Louisiana State University CTQP Asphalt Paving Technician - Level I 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SW 27th Ave SW 27th Ave Roadway Reconstruction, Miami Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida. 2007 (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Caraballo as Project Manager is currently providing engineering analysis and design services for a closed storm water a. drainage system along SW 27th Avenue between South Dixie Highway and South Bayshore Drive. The project consists of widening this stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered are the elevation changes throughout the stretch of roadway and the amount of utilities located throughout this older corridor. The team has worked diligently to provide a technically sound and cost effective design that incorporates all of the client's requirements and needs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Dade Waste Water Master Plan, Miami-Dade Water & Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Deoartment, Florida 2008 (3) BRIEF DESCRIPTION (Brief scope, Size, cost, etc.) AND SPECIFIC ROLE [ X] Check If project performed With current firm b. Mr. Caraballo as Project Engineer is currently providing services in an effort to develop Remedial Action Plans for approximately 350 Pump Stations. The Remedial Action Plans will help upgrade each individual pump station and make them compliant with the I O-Hr operating criteria. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, WTP JA Anion Exchange Program: Broward County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X I Check if project performed with current firm C. Mr. Caraballo provided project management services in for the design of a new Anion exchange system at the Broward County WTP 1 A. Mr. Caraballo is working closely with the design team to produce paving, grading, and drainage plans, as well as performing all the permitting required for this project. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, GOB Sidewalk Improvement Project: Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) County, Florida N/ A 2006 (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE [ X I Check If project performed with current firm d. Mr. Caraballo provided project management services to Miami-Dade County Public Works Construction ~ivision. The effort was to improve ADA access and compliance to existing and new sidewalk throughout Miami-Dade County. Mr. Caraballo performed surveys, provided construction cost estimates, monitored construction activities, reviewed the contractor's payment requisitions, and issued a certificate of completion for each site issued by the County. Mr. Caraballo coordinated all activities between the client and the contractor. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, Miramar Roadway Infrastructure Project: Miramar, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida N/ A 2007 STANDARD FORM 330 (6/2004) PAGE 4 - . . Mr. Caraballo provided project management services in monitoring the construction activities throughout the southern half of the City of M iramar. The project consisted of the installation of all the water, sewer, and drainage, as well as the expansion of a lift station and roadway resurfacing. Mr. Caraballo performed quality assurance reviews of the inspectors daily reports. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, NW 12th Avenue Construction Trailer Complex: PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami, Florida 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Caraballo has completed the design and permitting for a 5,053.12 S.F. trailer complex. The trailers were needed for the construction activities related to the widening of FOOT's NW 12th A venue Bascule Bridge. The design consisted of paving, grading, drainage, water, sewer, and electrical plans. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, New 8-inch DIP Water Main Extension for the Miami- PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Dade County Water and Sewer De artment (W ASD): Miami, Florida 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE [ X] Check if project performed with current firm Mr. Caraballo has completed the planning and design of over 3,000 feet of 8-inch water distribution pipeline for the Miami- Dade Water and Sewer Department. Mr. Caraballo was responsible for quality control and project coordination with the Master Consultant, W ASO, and permitting agencies. Additional responsibilities included project activities scheduling, preparation of engineering cost estimates, and coordination with other stakeholders. STANDARD FORM 330 (6/2004) PAGE 5 - . . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Srikanth V. Gajula, E.I., Project Engineer 13. ROLE IN THIS CONTRACT Civil Engineer 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 3 3 15. FIRM NAME AND LOCATION (Citrand State) CES Consultants, Inc. - Miami, Florida (Headquarters) 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S., (Civil Engineering) 2004; Florida International University 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., (Civil Engineering) 2002, Osmania University, Hyderabad, India 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) I nstitute of Transportation Engineers 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SW 27th Ave SW 27th Ave Roadway Reconstruction, Miami Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Florida. 2007 (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check If project performed with current firm Mr. Gajula as a Project Engineer is currently providing engineering analysis and design services for a closed storm water a. drainage system along SW 27th A venue between South Dixie Highway and South Bayshore Drive. The project consists of widening this stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered are the elevation changes throughout the stretch of roadway and the amount of utilities located throughout this old corridor. The team has worked diligently to provide a technically sound and cost effective design that incorporates all of the client's requirements and needs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Dade Waste Water Master Plan, Miami-Dade Water & Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Department, Florida 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed With current firm b. Mr. Gajula as a Project Engineer is currently providing engineering services in an effort to develop Remedial Action Plans for approximately 350 Pump Stations. The recommended upgrades will ensure compliance with the I O-hour run time per day limit criteria. This task evaluates all aspects of the pump stations, identify deficiencies and provide necessary recommendations for improvements which then be evaluated on a system wide basis. A cost analysis for the deficient pump stations is also provided in this task. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Assistant Project Manager, Sidealk Improvements, Traffic Signal and PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) School Flashing inspection Project: Miami-Dade County, Florida N/ A 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm C. As Project Engineer, Mr. Gajula coordinated construction and inspection activities, performed field inspections, reviewed the daily quantities constructed by the contractor and resolved complaints. He also provided QA/QC to the inspections performed by the inspectors. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Engineer, GOB Sidewalk Improvement Project: Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) County, Florida N/A 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check If project performed with current firm d. As a Project Engineer, Mr. Gajula was responsible for the management of construction operations, including supervision of all construction activities, project administration, quality assurance, project cost control and scheduling. His duties also include the preparation of reports, project coordination with sub-consultants, participates in weekly project meetings with the client. He also recommends project strategies, programs and resource allocation including staffing and budgeting to meet the organization .goals. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Engineer, FEMA-DORM Drainage Installation and Roadway PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Improvements Proiect: Miami-Dade County, Florida 2006 2006 STANDARD FORM 330 (6(2004) PAGE 6 e _ . (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( X I Check if project performed with current firm As Project Engineer, Mr. Gajula carried out construction of roadway improvement, drainage, roadway resurfacing and reconstruction. Mr. Gajula's responsibilities included the implementation of maintenance of traffic (MOT) plans, coordination with other agencies, county personnel, and community residents. His duties also comprised of multiple tasks including review of design layouts and construction reports prepared by qualified inspectors and several contractors to determine whether content was sufficient to meet design requirements; he performed review and quality control of design packages, construction documents including billing documentation eliminating discrepancies to allow reimbursement to Miami-Dade Count from the Federal Emer enc Mana ement A enc (FEMA). STANDARD FORM 330 (6(2004) PAGE 7 ,- . . . E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Arjen Bootsma, P.E., Senior Mechanical En ineer 15. FIRM NAME AND LOCATION (CIty and State) CES Consultants, Inc. - Miami, Florida (Headquarters) 16. EDUCATION (DEGREE AND SPECIALIZATION) Mechanical Engineer a. TOTAL 18 b. WITH CURRENT FIRM 3 months 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) M.S., (Mechanical Engineering) 1988, University of Twente, The Netherlands. Professional Engineer - FL 18. OTHER PROFESSIONAL QUALIFICATIONS (PublIcations, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Senior Drainage Engineer, SW 27th Ave SW 27th Ave Roadway PROFESSIONAL SERVICES I CONSTRUCTION (It applicable) Reconstruction, Miami Dade County, Florida 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ) Check if project performed with current firm Mr. Bootsma as Senior Drainage Engineer is currently providing engineering analysis and design services for a closed storm a. water drainage system along SW 27th Avenue between South Dixie Highway and South Bayshore Drive. The project consists of widening this stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered are the elevation changes throughout the stretch of roadway and the amount of utilities located throughout this older corridor. The team has worked diligently to provide a technically sound and cost effective design that incorporates all of the client's requirements and needs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Senior Mechanical Engineer, Miami Dade Waste Water Master Plan, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami-Dade Water & Sewer Department, Florida 2008 (3) BRIEF DESCRIPTION (Brief scope, SIze, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm b. Mr. Bootsma as Mechanical Engineer is currently providing services in an effort to develop Remedial Action Plans for approximately 350 Pump Stations. The Remedial Action Plans will help upgrade each individual pump station and make them compliant with the I O-Hr operating criteria. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Drainage Engineer, Silver Beach Road, Palm Beach County. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check If project performed With current firm Engineering and design for drainage system of 0.7 miles of roadway, partly adjacent to environmentally sensitive lands. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Drainage Engineer, 45th Street / Haverhill Road, Palm Beach County. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check If project performed With current firm Analysis and engineering for combining drainage systems for these two intersecting arterial roadways. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Drainage Engineer, Virginia Key Beach Parking Lot and Perimeter PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Road Improvements, City of Miami, Miami-Dade County. 2006 e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check If project performed with current firm Modeling and analysis of proposed drainage system for permitting. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Drainage Engineer, AlA / Ocean Drive, FDOT, Broward County. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2007 STANDARD FORM 330 (fV2004) PAGE 8 . . . (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm Design and engineering of drainage system for 1.3 miles of two-lane roadway along the Intracoastal Waterway. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Drainage Engineer, SR-932 (NW/NE 103 Street), FDOT, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) County. 2004 g. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ ] Check If project performed with current firm Design and engineering of drainage system for 1.5 miles of four-lane minor arterial urban roadway. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Drainage Engineer, Site and Civil Engineering for Residential Units PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Development, South Miami-Dade County. 2002 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ ) Check If project performed with current firm h. Site and civil engineering for 200+ acres / 525 residential unit development. Engineering and design included potable water supply, wastewater gravity system and pump station, roadway grading and drainage. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Engineer, Water Master Planning, Tamiami Airport. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 1999 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ ] Check If project performed With current firm i. Water master planning, based on built-out potable water demand, fire flow demand, local regulations and FAA requirements (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Drainage Engineer, South Dade Landfill. PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 1998 (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc) AND SPECIFIC ROLE [ ) Check if project performed With current firm j. Conceptual drainage modeling and design for built-out condition. Design included wetland retention areas, open channels, a filterberm and control structures. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Engineer, Petroleum Storage Farm in Port Everglades, Broward PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) County. 2002 (3) BRIEF DESCRIPTION (Bnef scope, size, cost, etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm k. Engineering, design and ERP-permit for a ten-acre petroleum storage farm. Design includes grading and three stormwater pump stations, controls, retention pond and controls for discharge on public storm sewers. STANDARD FORM 330 (6/2004) PAGE 9 e . . "." . .", 13. ROLE IN THIS CONTRACT Hydrologic Engineer 12. NAME Fernando Miralles-Wilhelm, Ph.D., P.E., DEE 15. FIRM NAME AND LOCATION (City and State) CES Consultants, Inc. - Miami, Florida (Headquarters) 16. EDUCATION (DEGREE AND SPEC/ALlZA TlON) Ph.D., (Water Resources) 1992; Massachusetts Institute of Technology 20 3 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer - MA, FL M.S., (Civil Engineering) 1989; University of California B.S., (Mechanical Engineering) 1987; Universidad Simon Bolivar; Venezuela 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, Stormwater Management Master Planning for the PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami-Dade Aviation Department: Miami, Florida 2004 a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ I Check if project performed with current firm Dr. Miralles was responsible for planning and improvement to storm water management systems at the Miami International Airport, Opa-Locka General Aviation Airport, and the Kendall- Tamiami Executive Airport. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, Sanitary Sewer Evaluation and Rehabilitation: PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Municipality of Faiardo, Commonwealth of Puerto Rico 2001 (3) BRIEF DESCRIPTION (Brief scope, SIZe, cost, etc) AND SPECIFIC ROLE [ ] Check if project performed With current firm b. Dr. Miralles was project manager for the evaluation and rehabilitation works of the sanitary sewer system of the municipality of Fajardo, working for the Agencia para el Financiamiento de Infraestructura de Puerto Rico (AFI). In this capacity, Dr. Miralles was responsible for the supervision of design and improvements to the existing rainfall-dependent infiltration and inflow (ROllI) to the sanitary sewer systems, including upgrades to the Luquillo wastewater treatment plant. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Manager, Water Supply Source Restoration: Sao Paolo, Brazil PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 1999 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ ] Check if project performed With current firm C. Dr. Miralles served as project manager for the design of the water and wastewater systems of the Guarapiranga reservoir near Sao Paolo, Brazil. This contaminated reservoir served as a water supply source for a significant fraction of the city's population. The project involved the conception and implementation of reservoir management strategies to enhance the water quantity and quality aspects of the water supply system. This project was financed by the World Bank. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Engineer, L10bregat River Strategy Development: Barcelona, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Spain 2002 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm d. In Barcelona, Spain, Dr. Miralles served as the project engineer in charge of developing a strategy for the reclamation of the Llobregat River. In addition to decreasing surface water levels and increasing pollution, the project was geared at maintaining an ecological flow of water in the river by using a tertiary treatment effluent, and its recirculation using an artificial wetland, as opposed to the current discharge into the Mediterranean Sea. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Project Director, Water Resources Master Plan: Lake Managua Basin, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Nicara,gua 2003 e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Dr. Miralles served as project director for a water resources master plan in the Lake Managua basin in Nicaragua. This project, financed by the World Bank, incorporated water treatment, distribution and reutilization as well as a tariff system geared at the fast growing population in the basin. STANDARD FORM 330 (6/2004) PAGE 10 . NAME Cristina M. Gonzalez, P.E. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Principal 14. YEARS EXPERIENCE 28 24 b. WITH CURRENT FIRM 22 a. TOTAL 15. FIRM NAME AND LOCATION (City and State) Langan Engineering & Environmental Services I Miami Lakes, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TlON) Cornell University, Master of Engineering in Civil Engineering (Geotechnical) 1/82 University of Miami, Bachelor of Science in Civil Engineering, 12/79 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) Registered Professional Engineer: FL #41915 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On- oing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE t8] Check if project performed with current firm. Lead engineer on the 36 and 26-story towers. Our extensive evaluation and interaction with the Structural Engineer provided the Owner substantial savin s with the use of shallow hi h-capacit iles for support of both towers. Cost of work: $1,600,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Turnberry Ocean Colony Development, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2007 (1) TITLE AND LOCATION (City and State) Fontainebleau II and III Towers, Miami Beach, Florida b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE t8] Check if project performed with current firm. This development is to consist of twin 38-story towers and a connecting submerged 3-level parking garage, compression, tension and lateral load testing for different size of augercast piles. Cost of work: $450,000 Performed c. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On- oing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE t8] Check if project performed with current firm. Project Principal The project is under-construction and consists of a 55-story residential tower in the southern end of Sunny Isles Beach. The foundation design for this project consists of the use of 30-inch-diameter, 145 ft to 150 ft long augered cast-in-place (ACIP) piles extended beyond the compressible sand and weakly cemented layers typically encountered in the Sunny Isles Beach area. The ACIP pile load testing program included the installation of a deep O-cell embedded jack, approximately 24 ft above the tip of the test pile, The services also included the collection and testing of the near-surface materials for compatibility with the beach sand, as part of the soil compatibilit performed b the pro'ect civil en ineer. Cost of work: $250,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dolphin Stadium, Miami Gardens, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On-going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE t8] Check if project performed with current firm, The Home of the Miami Dolphins and Florida Marlins is partially underlain by loose sands and partially by loose sands with a thin limerock layer. Supervised the subsurface investigation and assisted in developing the site stabilization for recommending shallow strip footings for the highly varying column loads. Reported on the subsurface conditions and developed a comparative foundation cost analysis comparing preloading, vi bra-replacement and dynamic compaction. Assisted in the preparation of the site preparation specifications, preload design, and preload monitoring and evaluation. Performed footing subgrade inspections, testing, and reporting. The engineering work also included the investigation, design, supervision and analysis of a full-scale field test to determine the impact and effectiveness of a 10-ton vibrato roller on sand with depth. Cost of work: $365,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fairfield Dadeland, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2003 (1) TITLE AND LOCATION (City and State) Solis Resort, Sunny Isles Beach, Florida d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE t8] Check if project performed with current firm. Ms, Gonzalez value engineered the foundations of this 26-story condominium tower and garage podium, increasing the pile capacity nearly 400% and reducing the lengths. Savings on the foundations alone were over $750,000. Also provided environmental engineering services and dewatering consultation, assisting with providing dewatering solutions and obtaining the dewaterin permit from various overnmental a encies. STANDARD FORM 330 (6/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each kev person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE 28 Lijian Zhou, P.E. Project Manager a. TOTAL b. WITH CURRENT FIRM 18 yrs 8 yrs 15. FIRM NAME AND LOCATION (City and State) Langan Engineering & Environmental Services I Miami Lakes, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Florida Master of Engineering in Civil Professional Engineer, State of Florida Engineering, 1999 (Geotechnical) Troxler Nuclear Moisture-Density Operator Certification Chengdu University of Science & Technology, Chengdu, China Master (1990) and Bachelor (1984) of Engineering in Civil Engineering (Structural) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The Four Seasons Hotel & Tower, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) 2003 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm. a. This development consists of a 66-story high rise hotel, condominium, and office building, a 20-story podium and 6-story garage. Assisted in the geotechnical construction aspects of this project to include the following: (A) Full-time inspection of over 100, 6-ft diameter polymer drilled shafts with lengths of 110ft to 135 ft. Installation techniques included: 1) uncased drilled shafts stabilized with polymer or bentonite slurry, and 2) cased drilled shafts in the upper portions and slurry stabilized in the lower portions; (B) Field inspection of 200, 24-inch diameter, 400-ton piles and full- scale compressive, tensile, and lateral load testing of instrumented ACIP piles; (C) Field inspection of tremie sealed sheeted excavations (cofferdams) to facilitate dewatering and subsequent placement of cap concrete up to 17 ft below the groundwater table; (D) Intensive tower settlement monitoring to verify the settlement performance. (E) Field inspection of footing subgrade preparation and installation of garage slab underdrain system to relieve hydrostatic pressure under flood conditions. Cost of work: $1,300.000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Marina Blue, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) 2007 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm. Responsibilities included overseeing subsurface investigation, designing, and preparing Geotechnical Engineering Report for the proposed 57-story Tower and the surrounding 12-level Podium/Garage. Engineered and oversaw the installation of the deepest 30-inch augercast pile yet and the installation of the Osterberg-Cell in an augercast pile for the first time in the USA. Cost of work: $90,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Trump International Hotel and Tower, Ft. Lauderdale, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm. c. Responsibilities included overseeing subsurface investigation, designing, and preparing Geotechnical Engineering Report for the 26-story Tower, the surrounding 9-level Podium/Garage and the 4-story retail building. Evaluated and successfully engineered the utilization of two different pile lengths to support the tower. Evaluated, coordinated, and assisted in managing all foundation related activities including pile load testing, inspections. excavation support, monitoring, dewatering issues, and tower-podium connections; and interaction with the owner and the contractor, Cost of work: $180,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dolphin Stadium, Miami Gardens, Florida PROFESSIONAL SERVICES -1 CONSTRUCTION (if applicable) On-going d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm. Designed and oversaw the construction of the foundation aspects of the expansion of the Dolphins Stadium for SuperBowl XXVI. The implemented foundation systems consisted of footings on improved soils, high-capacity rock anchors and augered-cast-in-place piles. Cost of work: $365,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Turnberry Ocean Colony Development, Sunny Isles Beach, Florida PROFESSIONAL SERVICES 1 CONSTRUCTION (if applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm. This development consists of twin 38-story towers and a connecting submerged 3-level parking garage. Assisted with the preparation of the geotechnical engineering study report for the support of the towers on 420-ton, 24-inch-dia augercast piles and settlement related issues. Provided construction oversight and project management during augercast load testing, production pile installation, and sheet pile installation, Cost of work: $450.000 STANDARD FORM 330 (6/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 2. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE 28 Matthew E. Meyer, P.E. Geotechnical Engineer a. TOTAL b. WITH CURRENT FIRM 13 Y, yrs 10 Y, yrs 15. FIRM NAME AND LOCATION (City and State) Langan Engineering & Environmental Services I Miami Lakes, Florida 16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Virginia Polytechnic Institute and State University, Master of Florida and West Virginia I FL #54630 Science in Civil Engineering, (Geotechnical) 1995 PAOI Certified SCUBA Diver The Citadel (The Military College of South Carolina) Bachelor of Science in Civil Engineering, 1994 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The Four Seasons Hotel & Tower, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) 2003 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 121 Check if project performed with current firm. a. This development consists of a 66-story high rise hotel, condominium, and office building, a 20-story podium and 6-story garage, Assisted in the geotechnical construction aspects of this project to include the following: (A) Full-time inspection, load testing and coordination of over 100, 6-ft diameter polymer drilled shafts with lengths of 110ft to 135 ft. Installation techniques included: 1) uncased drilled shafts stabilized with polymer or bentonite slurry, and 2) cased drilled shafts in the upper portions and slurry stabilized in the lower portions; (B) Dewatering consultation and field inspection of tremie sealed sheeted excavations (cofferdams) to facilitate dewatering and subsequent placement of cap concrete up to 17 ft below the qroundwater table. Cost of work: $1,300,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Met 2 and Met 3 Tower, Miami, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) On-going b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 121 Check if project performed with current firm. This development is to consist of a 1-billion dollar development including three high-rise structures ranging from 45-stories to 75-stories and adjacent connecting garage/podium, theater structure. Performed a geotechnical engineering study and provided technical assistance throughout the design/construction phases of this project. This project was initially designed to be supported on 125, 6-ft-diameter drilled shafts installed to significant depths; however, due to significant advances in the local ACIP Piling industry, 36-inch-diameter, 1,200 ton piles were utilized for tower support, Cost of work: $1,000,000 (phased) (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Solis Resort, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) On-going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 121 Check if project performed with current firm. c. Technical Advisor. The project is under-construction and consists of a 55-story residential tower in the southern end of Sunny Isles Beach. The foundation design for this project consists of the use of 30-inch-diameter, 145 ft to 150 ft long augered cast-in- place (ACIP) piles extended beyond the compressible sand and weakly cemented layers typically encountered in the Sunny Isles Beach area. The ACIP pile load testing program included the installation of a deep O-cell embedded jack, approximately 24 ft above the tip of the test pile, The services also included the collection and testing of the near-surface materials for compatibility with the beach sand, as part of the soil compatibility performed by the project civil engineer. Cost of work: $250,000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dolphin Stadium, Miami Gardens, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) On-going d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 121 Check if project performed with current firm. Designed and oversaw the construction of the foundation aspects of the expansion of the Dolphins Stadium for SuperBowl XXVI. The implemented foundation systems consisted of footings on improved soils, high-capacity rock anchors and augered-cast-in-place piles. Cost of work: $365.000 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Turnberry Ocean Colony Development, Sunny Isles Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 121 Check if project performed with current firm. This development consists of twin 38-story towers and a connecting submerged 3-level parking garage. Assisted with the preparation of the geotechnical engineering study report for the support of the towers on 420-ton. 24-inch-dia augercast piles and settlement related issues. Provided construction oversight and project management during augercast load testing, production pile installation, and sheet pile installation. Cost of work: $450,000 STANDARD FORM 330 (6/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person. 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Daniel R, Grenier, ~1.E,S, Permitting, Mitigation/Restoration, Monitoring, Field Investigations, Statistical a TOTAL I b WITH CURRENT FIRM and Geographical Analysis 8 2 15. FIRM NAME AND LOCATION (City and State) Langan Engineering 0 Environmental Services, Miami Lakes, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17 CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Pennsylvania; N/A M,E.S. Environmental Biology, 2001 B.A. Environmental Science; Biology Concentration, 20m Wharton School of Business, Minor; Organization and Environmental Management. 20m 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Publication: A How-To Guide for the Siting and Design of Constructed Wetlands for Use in Stormwater Management and Nonpoint Source Pollution Mitigation Strategies in New Jerseys Watershed Management Area 18 and the Coastal Plain Region. (Sponsored by the Delaware Valley Regional Planning Commission.) Droanizations: Society of Wetland Scientists and American Water Resources Association Trainino: Florida Statewide Wetland Delineation Training (Chapter 62-340); Florida Wetland Plant Identification Training (Richard Chinn Environmental Training); 38.Hour Army Corps of Engineers Wetland Delineation and Management Training Program; 3D-Hour OSHA General Industry; Six Sigma Management Training. 19, RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Main Street Development. Fort Myers, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) 2006 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. a. New construction of a residential community on an approximately 38.D-acre former agricultural site. Project responsibilities included: Nutrient loading analysis; state and federal wetland permitting: UMAM assessment: coordination of off-site mitigation requirements with a local mitigation ban~ GIS analysis; regulatory meetings; and project coordination meetings. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sun 'n lake, Sebring, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. b. New construction of a residential community on an approximately 7.200-acre undeveloped site, Project responsibilities included: State and federal wetland permits review and compliance: new federal wetland permits: groundwater level testing; installation of soil borings: determination of Seasonal High Water Table: GIS analysis: regulatory meetings: and proiect coordination meetinQs. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ventanas, Homestead, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) 2006 2006 (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. C. New construction of a residential community on an approximately 30.0-acre former agricultural site. Project responsibilities included: State, county, and federal wetland permits compliance; Army Corps Jurisdictional Determination challenge; wetland mitigation assessment (UMAM); coordination with local mitigation bank; GIS analysis; soil sampling for determination of isolated wetland locations; regulatory meetinos; and proiect coordination meetinos. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Border Patrol at Oania Beach, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Ongoing d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. New construction of a Homeland Security facility on a 4.346-acre site near the Hollywood - Fort Lauderdale International Airport. Project responsibilities included: Wetland delineation, county and federal wetlands permitting, wetlands mitigation assessment, Phase I Environmental Site Assessment, and project coordination meetings. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED The Shoppes at Coconut Creek, Broward County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (if applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE 18I Check if project performed with current firm. e. New construction of a Lifestyle Community Center on an approximately 20.0-acre former agricultural site. Project responsibilities included: Wetland delineation, county and federal wetlands permitting, wetland mitigation assessment, and project coordination meetings. STANDARD FORM 330 (6/2004) PAGE 2 12. NAME Vincent 0, Varina. P.G, E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Com lete one Section E for each ke erson, 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE 28 a. TOTAL 15 b. WITH CURRENT FIRM 8 FIRM NAME AND LOCATION (City and State) Langan Engineering H Environmental Services. Inc.. Miami. Florida IS. EDUCATION (DECREE AND SPECIALIZATION) Pennsylvania StatB University, 8S in Earth SciBncB, 1992 Orexel University, /.is in Engineering Geology,1998 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Profmional Geologist in Florida (No. 20m and PBnnsylvania (No. 32S0-E) CertifiBd Florida Environmental Amssor (No. 248) limsBd EnvironmBntal Professional (No, 73) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) Deering Bay Country Club - Hydrogeologic Services Coral Gables, Florida a. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing NIA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. The project consisted of a forensic investigation to determine why two lake lowering discharge wells were not operating at capacity. The system consisted of pumping from on-site lakes into the drainage wells. The investigation included reviewing and interpreting geologic logs, evaluating well construction logs, collecting and evaluating hydrologic data for the on-site ponds and Biscayne Bay. Langan conducted a hydrogeologic investigation to determine suitable zones for injection of untreated lake water and a surface water investigation to determine water quality of the discharged lake water. As part of the permitting of this well, Langan is currently conducting a hydrogeologic investigation to determine the lateral continuity of a semi- confining layer above the untreated production zones. Mr, Yarina managed all aspects of this project. and provided technical review and professional certifications for finished work products. His work on this project has allowed the client to realize a significant cost savings in water treatment and avoid otentiallon -term fines for violation of Florida Statutes. The cost of the ro'ect is $45,000 and is on oin . (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Residences at Atlantic East - Hydrogeologic Evaluation PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Pompano Beach, Florida 2005 2006 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. Langan evaluated a hydrogeologic investigation conducted by Jaffer Associates to provide a Reasonable Assurance Report to satisfy the requirements of Chapter 62-528, Florida Administrative Code (FAC), for permitting of Class V, Group 6 underground injection control wells for deep injection of stormwater runoff. Langan's evaluation of the water quality and geological data collected from a 200 ft deep test hole indicated that deep well injection could not be accomplished until 140 ft bls. Mr. Yarina managed all aspects of this project, and provided technical review and rofessional certifications for finished work roducts. The cost of the com leted ro'ect was a roximatel $5,000. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 200 Las Olas Circle - Hydrogeologic Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Fort Lauderdale, Florida 2006 ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. Langan conducted a hydrogeologic investigation to collect data to provide a Reasonable Assurance Report to satisfy the requirements of Chapter 62-528, Florida Administrative Code (FAC), for permitting of Class V, Group 6 underground injection control wells for deep injection of stormwater runoff. Langan supervised the logging of a 150ft-deep test hole using geophysical techniques (induction conductivity, neutron, and gamma-gamma) and Standard Penetration Test data and the collection of water quality using a "real-time" rotary method. An evaluation of the geophysical. geotechnical and water quality data indicated that 105 ft below land surface (bls) was suitable for injection and meet the intent of the Chapter 62-528. FAC requirements. Mr. Yarina managed all aspects of this project. and provided technical review and professional certifications for finished work roducts. c. (1) TITLE AND LOCATION (City and State) Turnberry Ocean Colony Site, Sunny Isles Beach, Florida d. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 1995-1996 Unknown (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm. Performed a Phase II ESA for contiguous vacant parcels of land that formerly contained low-rise motels. Investigated an on-site concern regarding soil staining and an off-site concern relating to potential migration of a groundwater contamination plume originating from a nearby dry cleaner. The Phase II consisted of the construction of three wells (2 shallow and 1 deep double-case well) and sampling and testing the soil-groundwater for chlorinated and petroleum-based compounds. Petroleum contaminated soil and groundwater was identified in the stained soil area. Provided recommendations and cost-estimates for erformin ro er assessment and otentia! remediation of the concern. (1) TITLE AND LOCATION (City and State) Palm Beach Aggregates, Palm Beach County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2002-2003 NA (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE IZJ Check if project performed with current firm. The project consisted of performing a Phase I and Phase II Environmental Site Assessments (ESA) for the SFWMD at a 1300-acre limestone mining quarry and sod farm, The project is one of the "cornerstone" projects of the Comprehensive Everglades Restoration Plan (CERP), The limestone rock mines were extremely low in permeability which will allow their use for surface water storage for billions of gallons of water for future supply purposes, Mr. Yarina developed and supervised implementation of the scope of work for assessment of the entire property which included historical research, site reconnaissance, soil. sediment. surface water and groundwater sampling, Recommendations for further assessment were provided. Based on the work erformed. the SFWMD urchased the land for more than $150,000. STANDARD FORM 330 6/2004 PAGE 2 - O. E. F. G. 23a. 23b. 23c. 24. F.XAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) . 25 EXAMPLE PROJECT KEY NUMBER: 1 TITLE AND LOCATION (City and State): Homestead Air Reserve Park, Homestead, Florida YEAR COMPLETED - PROFESSIONAL SERVICES: 2003 - Sr. Project Manager / Designer YEAR COMPLETED - CONSTRUCTION (If applicable): 2003 PROJECT OWNER'S INFORMATION - PROJECT OWNER:-Miami-Dade County, Department of Park and Recreation PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: Ms. Adelfa Martinez PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER: (305) 775-7815 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): Architectural/Engineering Services for a Regional Park. The scope of services included the utilities master plan for the park, the scope verification of the master plan, the design of Recreation Field Center, multiple soccer fields with bleachers, multiple baseball fields, fields to include lighting and irrigation, picnic shelters, restrooms/storage building, three parking lots with 268 parking spaces in total, and pathways. Project Manager for the County Adelfa Martinez. This project is currently Ongoing and design phase was just been completed. The construction cost of Phase I for this project was estimated to be $4,530,000.00, with the overall construction cost for all Phases at $ 40,000,000 dollars. Sr. Project Manager responsible for Site planning and coordination with civil engineering for all utilities and traffic constraints. Design two picnic shelter buildings, a Community Field House, two lit football/soccer fields and parking area for two hundred sixty four cars. Responsible for the oversight of construction documents preparation, the coordination of all engineering tears, and provide the construction administration overview of the project. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT: (1) FIRM NAME CMF INTERNATIONAL GROUP,INC. (2) FIRM LOCATION {City and State (3) ROLE Miami, Florida Architecture / Construction Mana ement . 1/ r l II()MI'~II'Al)AIR RrSIR\'r PARK. IIOMI:STI'AD, FLORI DA STANDARD FORM 330 (6/2004) PAGE 12 - O. E. F. G. 23a. 23b. 23c. 24. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as manv projects as requested bV the agencv, or 10 projects, if not specified. Complete one Section F for each project. EXAMPLE PROJECT KEY NUMBER: 2 TITLE AND LOCATION (CitV and State): Southridge Community and Aquatic Center, Phase III. Miami, Florida YEAR COMPLETED - PROFESSIONAL SERVICES: Completed 2007- Cost Estimatesl Q/A-C/A/Construction Management YEAR COMPLETED - CONSTRUCTION (If applicable): Expected Completion 2008-Q/A-Q/C- Construction Management PROJECT OWNER'S INFORMATION - PROJECT OWNER: Miami-Dade County Park & Recreation PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: Mr. Guillermo Garcia, P.M. PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER: (305) 775-7815 BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): Architecture construction management for the design of a community and Aquatic center. The total structure is 13,369 sq.ft. that will include the community center building with activity rooms, offices' restrooms, lifeguard locker area, snack bar, public bathrooms with showers and locker rooms, aquatic center, covered outdoor seating area, exterior and covered breezeway. The pool area totals 11,977 sq.ft that includes a children's water play pool, a teaching pool, a 25 yard competition pool. A Mechanical Building to house all pool equipment. Site Development that includes parking for the facility. An estimated cost of $5,301,231. CMF is responsible for the Construction Management Services, Cost Estimating, Q/A/QC and Construction Administration. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT: X (1) FIRM NAME (2) FIRM LOCATION (CitV and State (3) ROLE CMF INTERNATIONAL GROUP,INC. Miami, Florida Cost Estimatesl Q/A-Q/CI Construction Management . ............,..,.".......-. ~~. .OUIIIRIlXiE COMMu/>.ny A/>.D AqJJAIR CI./>.II.R MIAM.I. FLORJDA STANDARD FORM 330 (6/2004) PAGE 13 . F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) EXAMPLE PROJECT KEY NUMBER: 3 TITLE AND LOCATION (City and State): Women's Park, Women's Historic Gallery, Miami-Dade County Park and Recreation, Miami, Florida. YEAR COMPLETED - PROFESSIONAL SERVICES: 1997-2001 YEAR COMPLETED - CONSTRUCTION (If applicable): 2001 23a. PROJECT OWNER'S INFORMATION - PROJECT OWNER: Miami.Dade Park & Recreation 23b. PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: MS.Vivian Izsack 23c. PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER: 305755-7973 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): Mr.Carlos M. Flores,AIA, NCARB. Project ArchitectlDesigner for Alleguez,Grafton ,Flores Architects. Calos M.Flores was also the Architect of Recprd and responsible for the proper location of the building in an existing park. Prepare a programming and obtain the approval of the Women's Gallery Committee, design the building, overseeing the preparation of construction documents and providing construction administration overview of the project. The project consisted of 6,000 sq, ft. of building dedicated to exhibit of prominent women of the community, it included a reception area, the lobby I main exhibit area, a videol projection room, a multipurpose room, food preparation room, administration work area and the curators office, storage room for props and exterior storage facility for use of the park maintenance, and the exterior terrace for outdoors functions. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT: . (1) FIRM NAME Carlos M. Flores, AlA (2) FIRM LOCATION (City and State) Miami, Florida (3) ROLE Principal in ChargelArchitect of Record Approval by Art Gallery Committee ." . .:~ ,,~'-.e'" .....!..~.; '-ft -:. ..... ~- ~...., ~'>:<lf t.... ~ . , ~.t ~- -,--. ~." I ! .~~OMIr--'S PARK. WO,'II1'..S 111.\lORIC (,A/ll'RY, MI."""II DADI COI II'. II' PAil" AI'.D RIClU,AIIOl'.. MI~\o\1. nORIDA STANDARD FORM 330 (6/2004) PAGE 14 - O. E. F. G. 23a. 23b. 23c. 24. . 25. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) EXAMPLE PROJECT KEY NUMBER: 4 TITLE AND LOCATION (City and State): Planning for a Parking Structure for the Miami-Dade Aviation Department, Miami, Florida YEAR COMPLETED - PROFESSIONAL SERVICES: 2005 - Flor C. Munoz. R.A. - MOAO. Project Manager, Planning ~ivision YEAR COMPLETED - CONSTRUCTION (If applicable): N/A PROJECT OWNER'S INFORMATION - PROJECT OWNER: Miami-Dade Aviation Department, Planning ~ivision PROJECT OWNER'S INFORMATION - POINT OF CONTACT NAME: Mr. Manuel Rodriguez, former Planning ~ivision Assistant Director PROJECT OWNER'S INFORMATION - POINT OF CONTACT TELEPHONE NUMBER: N/A BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): This Facility Structure is planned to be located on the North East area of Building 100, with direct entrance to the building site and access to NW 36 Street. This new facility would have a capacity of a minimum 250 cars. Spaces and the alternate option of increased capacity at bid process up to 500 car spaces. The facility will consist of providing a minimum required 100 spaces for adjacent building and the additional spaces would be used for future tenant's expansion of personnel. This facility structure reinforced concrete with three stories height and would be designed to be in full compliance with Florida Building Code and NFPA - MOAO Project Manager responsible for the preparation of Study, engineering coordination, review for compliance with code, coordinate for cost estimating and scheduling. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT: (1) FIRM NAME Flor C. Munoz. R.A. MIAMI-DADE AVIATION DEPT. Plannin Division (2) FIRM LOCATION (City and State) Miami, Florida B lug ~()() I DO Propos<:d Sit.: 1'1."/'0./'0.1/'0.(; S IlIDY FOil ^ I'ARKINC S'I RUClURL !-oR n II MiAMI DADI AVIAIIO/'o. DEI'AlU,..UN r, MIAMI-DADE, fLORIDA STANDARD FORM 330 (6/2004) PAGE 15 - . . Examvle Pro;ect Kev No.5 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 02-139 Complete one Section F for each project.) 21. TITLE AND LOCATION (City and Slale) 22, YEAR COMPLETED South Miami Medical Office Building PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Structural Services N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CONTACT NAME I c. POINT OF CONTACT TELEPHONE NUMBER Baptist Hospital - MGE Architects Peter Goicuria 305-444-0413 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) This office provided design and construction phase services for the parking garage at South Miami Hospital. This five story-parking garage has 680 parking spaces with the option of a five story extension on top. We performed Value Analysis & Life Cycle Costing for this structure. The total cost of the project was 5.3 million dollars. This project was completed two months prior to the scheduled completion time and was under budget. Construction cost for this parking garage was below 7,500.00 per parking space, 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE a. Pistorino & Alam Consulting 7171 SW 62nd Avenue Structural Engineers Engineers, Inc. Miami, Florida (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE d, (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) Page 9 Example Proiect Kev No.5 PISTORINO & ALAM CONSULTING ENGINEERS - EXPERIENCE South Miami Medical Office Building . This office provided design and construction phase services for the parking gara! South Miami Hospital. This five story-parking garage has 680 parking spaces wid option of a five story extension on top. We performed Value Analysis & Life ( Costing for this structure. The total cost of the project was 5.3 million dollars. project was completed two months prior to the scheduled completion time and was u budget. Construction cost for this parking garage was below 7,500.00 per parking spa . Page 1 - - e Example Proiect Kev No.6 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED South Miami Metrorail Station Parking Garage, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Structural Services N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER I b. POINT OF CONTACT NAME Ic POINT OF CONTACT TELEPHONE NUMBER Miami Dade Transit Mr. Surinder Sahota 305-375-4504 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) The design of all on-site and off-site improvements including a new interconnect fire water main servicing the local public areas adjacent to the South Miami Metro Rail Station. The project included on-site drainage system which can handle runoff from a 10 story building on a restricted site without temporarily flooding or affecting public transportation facilities. The site was complex as numerous utilities were located adjacent to the site which were not fully documented. The contract documents called for careful exploration during excavation so as not to disrupt vital utilities to surrounding business operations. Traffic maintenance and control were critical as the work involved impact to Sunset Drive, a major arterial. Provisions had to be made to include drainage capability for an existing adjacent site which had previously been utilizing the project site for its storm water runoff. Since the whole site is subject to heavy pedestrian volumes, drainage was very critical as any minor ponding would result in a great inconvenience to users of the Metro Rail Station facility. Demolition of the existing site was also complex in that the existing drainage had to be removed while still accommodating the runoff from the adjacent facilities. Since the site was limited additional provisions had to be made for earthwork and fill stockpiling so as not to impact public right-of-way. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Pistorino & Alam Consulting 7171 SW 62nd Avenue Structural Engineers Engineers, Inc. Miami, Florida 33143 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b, (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c, (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) Page 10 EXflmole Project Kev No.6 PISTORINO & ALAM CONSULTING ENGINEERS - EXPERIENCE South Miami Parking Garage Expansion and Site Improvemell e -- _ -- -- ... - 1. L,,- . "j I - -- .-- ~ The design of all on-site and off-site improvements including a 590 parking spaces the option of adding a five story parking garage or a three story office building, a interconnect fire water main servicing the local public areas adjacent to the South M Metro Rail Station. The project included on-site drainage system which can handle n from a 10 story building on a restricted site without temporarily flooding or affet public transportation facilities. e Page 2 - . . Example Pro;ect Kev No.6 PISTORINO & ALAM CONSULTING ENGINEERS EXPERIENCE The site was complex as numerous utilities were located adjacent to the site, which' not fully documented. The contract documents called for careful exploration dt excavation so as not to disrupt vital utilities to surrounding business operations. Tr maintenance and control were critical as the work involved impact to Sunset Dri' major arterial. Provisions had to be made to include drainage capability for an existing adjacent which had previously been utilizing the project site for its storm water runoff. Sincl whole site is subject to heavy pedestrian volumes, drainage was very critical as any IT ponding would result in a great inconvenience to users of the Metro Rail Station facil Demolition of the existing site was also complex in that the existing drainage had t removed while still accommodating the runoff from the adjacent facilities. Since th~ was limited additional provisions had to be made for earthwork and fill stockpiling ~ not to impact public right-of-way. Page 3 Example Project Kev No.7 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) e' 21. EXAMPLE PROJECT KEY NUMBER: 1 TITLE AND LOCATION (City and State): South Pointe Park, Miami Beach, Florida 22a, YEAR COMPLETED - PROFESSIONAL SERVICES: 2006 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 2007 23. PROJECT OWNER'S INFORMATION 23a. PROJECT OWNER: City of Miami Beach 23b, POINT OF CONTACT NAME: Nuri Menicucci 23c. POINT OF CONTACT TELEPHONE NUMBER: 305673-7071 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost): South Point Park is designed as a dramatic, ecologically sensitive park at the south end of Miami Beach. The design is programmed to accommodate both active and passive recreation, with play fields, dune, and hammock zones, a playground, and a 20 ft. wide baywalk. An important goal in the Master Plan process was to integrate the park into the urban fabric of the city by strengthening and improving the two major street axes which penetrate the park space. SMDS provided consultation for masterlsite planning, paving materials and site furniture selection, and was the primary landscape architect for the park's planting and irrigation improvements. The fast-track design process began with Master Planning in April 2005, construction a.. documentation is complete, and the park completion is scheduled for March of 2008. Project Cost: $20,000,000 . Services: Master Planning, Planting & Irrigation Improvements, Construction Phase Services. Courtesy of Hargreaves & Associates 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Local Landscape Architects Coastal Systems Coral Gables, Florida Marine & Civil Engineering Ken Di Donato Fort Lauderdale, Florida Irrigation Consultant e STANDARD FORM 330 (6/2004) PAGE 1 Example Project Kev No.8 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) .0, 21. EXAMPLE PROJECT KEY NUMBER: 2 TITLE AND LOCATION (City and State): Sunny Isles City Hall, Sunny Isles, Florida 22a. YEAR COMPLETED - PROFESSIONAL SERVICES: 2004 22b. YEAR COMPLETED - CONSTRUCTION (If applicable): 2005 23. PROJECT OWNER'S INFORMATION 23a. PROJECT OWNER: City of Sunny Isles Beach 23b. POINT OF CONTACT NAME: Jorge Vera 23c. POINT OF CONTACT TELEPHONE NUMBER: 305947-0606 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost): Our open space design concept integrates the City Hall site and adjacent restaurant into a cohesive urban setting. A large fountain embraces the council chambers, providing a continuous seating area for passerby and employees alike, terminating at a small courtyard adjacent to the library. The plaza was designed to expand north as part of a future City Hall expansion project. The interplay of the shimmering water and lights on the blue mosaic wall creates a civic nighttime display. Services: Site Master Plan, Schematic Design through Construction Phase Services for Planting, Paving, Site Lighting, Irrigation, and Fountain Design. Project Cost: $750,000 . 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE Savino & Miller Design Studio North Miami, Florida Local Landscape Architects Hall Fountain Fort Lauderdale, Florida Fountain Design . STANDARD FORM 330 (6/2004) PAGE 2 Exanl/Jle Pro;ect Kev No.9 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specifIed. Complete one Section F for each project) 20. EXAMPLE PROJECT KEY NUMBER 1 - 21. TITLE AND LOCATION (City and State) City of Homestead Flagship Cinema, Homestead, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A 2005 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER The City of Homestead b. POINT OF CONTACT NAME Roberto S. Ortiz, P.E. c. POINT OF CONTACT TELEPHONE NUMBER (305) 704-4429 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Cost: $12,000,000.00 As part of the City of Homestead's Block Grant Program, the City obtained the services of a consultant team to design and provide construction management and inspection services for the construction of a new Flagship Cinema and associated infrastructure improvements. CES provided Construction Management and Inspection services. CES was also responsible for certifying the work performed, in compliance with City of Homestead construction standards. The new cinema is located on the southwest comer of Campbell Drive and the Florida Turnpike. The following is a list of the services provided by CES. . ./ Construction Management Services ~ Coordination of contractors construction activities ~ Coordination between the client, engineer, and contractors ~ Tracking material quantities ~ Creating daily progress reports ./ Construction Inspection Services ./ Certification of Completed Work In addition to the construction management, CES staff provided inspection services and project certification for the construction of a new 4-lane access roadway, including: ./ Installation of new 8-inch water main ./ Installation of new sanitary sewer; ./ Construction of a new submersible pump pumping station and force main; ./ Installation of drainage boxes and catch basins; ./ Construction of parking lot, signage, sub-base installation, asphalt paving, pavement markings, lighting work, installation of foliage and street landscaping. All work supervised to meet FDOT, City and County standards. 25, FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT . (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. CES Consultants, Inc. Miami, FL Construction Management and Inspection (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6,1'200I) PAGE 1 Example Pro;ect Kev No. 10 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified, Com lete one Section F for each ro 'ect, 1, TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Ocean Colony, Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2007 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER T urnberry Associates b. POINT OF CONTACT NAME AI Barrera c. POINT OF CONTACT TELEPHONE NUMBER (305) 944-6164 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost) The project consists of twin 40-story residential towers constructed seaward of Collins Avenue within Sunny Isles Beach. The foundation design for this project consists of the use of 24-inch-diameter, 95-ft-long augered cast-in-place (ACIP) piles extended beyond the shallower sand and weakly cemented layers typically encountered in the Sunny Isles Beach area. The settlement of the towers was monitored during construction, and the towers settled between 2.5 and 5 inches. Langan's environmental involvement included a Phase I/Phase II environmental site assessment, as well as underground storage tank closure assessment reports associated with the removal of three underground tanks encountered during construction. In addition, Langan's coastal permitting and design involvement included a soil compatibility study, an evaluation of the existing seawall condition, a design of a new seawall on the northern portion of the site, as well coordination of the coastal state permitting process. ...-,...,., Contract Value: $450,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME a. Langan Engineering & Environmental Services (2) FIRM LOCATION (City and State) Miami Lakes, Florida (3) ROLE Subsurface Investigation Foundation, Recommendations and Construction Inspection, Design of Excavation Support System, Tower Monitoring, Phase I and Phase II Environmental Site Assessment, Tank Closure Assessment Reports, Coastal Permitting and Engineering (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (6/2004) PAGE 3 - . . G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28, EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF KEY 27. ROLE IN THIS (Fill in "Example Projects Key" section below before PERSONNEL CONTRACT completing table, Place "X" under project key number for (From Section E, Block 12) (From Section E, Block 13) participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Carlos M. Flores, AlA Architect-Principal in Charge X X X CMF International Group, Inc. Flor C. Munoz, R.A. Project Manager/Planner X CMF International Group Fred Poey Construction Manager X X CMF International Group, Inc. Nasir M. Alam,P.E. Principal in charge- X X Pistorino & Alam-. Structural & MEP Engineering Tahir Iqbal,P.E. Project Manager X X Pistorino & Alam- Structural & MEP Eng. James Trowbridge Structural Design X X Eng.Pistorino & Alam Structural & MEP Engineers James Smith, P.E. V.P. Electrical X X V.P .Electrical Pistorino & Alam Engineer Structural & MEP Engineers Evgueni Savistky Mechanical Design X X Eng.Pistorino & Alam Structural & MEP Engineers Barry R.Miller. Partner in Charge X X Savino &.Miller,Design Studio. Adriana Savino Miller Project Designer, Quality X X Control-Savino& Miller Design Studio Talita Gutierres Landscape Architectural X X Designer/Drafting. S&M Rudy M. Ortiz, P.E. Managing Principal- X CES Consultants, Inc. Jose A. Compres Project Manager ICES X Civil &Structural Engineering Arjen Bootsman,P.E Senior Mechanical/CES X Engineer / Mechanical Jose A. Caraballo Project Engineer-CES X Civil &Environmental Engineering STANDARD FORM 330 (6/2004) PAGE 22 . . . Srikanth V.Gajula, Project Engineer / CES X E.!. Transportation Engineering. Cristina Gonzalez,P.E Principal-Langan X Engineering & Environmental Services Lijian Zhou, P.E. Project Manager-Langan X Engineering & Environmental Services Daniel R. Grenier, Permitting- Langan X M.E.S. Engineering & Environmental Services Vincent D.Yarina,P.E Project Manager-Langan X Engineering & Environmental Services R.S. Murali, M. S. Project Manager- X Sedimentology- Langan Engineering & Environmental Services 29. EXAMPLE PROJECTS KEY NO, TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) Homestead Air Reserve Park and Utilities Master Plan, South Miami parking Garage Expansion and Site 1 Homestead, Florida 6 Improvement. Southridge Community & Aquatic Center, Miami, Florida South Pointe Park, Miami Beach, Florida 2 7 3 Women's Park, Women's History Gallery. Miami-Dade 8 Sunny Isles City Hall, Sunny Isles Beach. Florida County Park and Recreation, Miami, Florida 4 Planning for a Parking Structure for the Miami-Dade Aviation Department, Miami, Florida. 9 City of Homestead Flagship Cinema, Homestead. Florida South Miami Medical Office Building-680 parking spaces 5 for the Parking Garage. 10 Ocean Colony, Sunny Isles Beach, Florida H. ADDITIONAL INFORMATION 29, PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED: 9. AUTHORIZED REPRESENTATIVE The foregoing is_a statement of facts. -.--- 30. SIGNATURE OF AUTHORIZED REPRESENTATIVE: 31, DATE SIGNED: October 9,2007 32. NAME AND TITLE OF SIGNER: Mr. Carlos, M, Flores, AlA. President STANDARD FORM 330 (6/2004) PAGE 23 ARCHITECT-ENGINEER QUALIFICATIONS - PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 1. SOLICITATION NUMBER (If any): 2a, FIRM (OR BRANCH OFFICE) NAME: CMF INTERNATIONAL GROUP, INC. 2b. FIRM (OR BRANCH OFFICE) STREET: 9300 South Dadeland Blvd., Suite 602 e. : laml 2d. FIRM (OR BRANCH OFFICE) STATE: Florida 2e. FIRM (OR BRANCH OFFICE) ZIP CODE: 33156 3. YEAR EST ABLlSHED:2003 4. DUNS NUMBER: 160342445 5a, OWNERSHIP - TYPE: CORPORATION 5b. OWNERSHIP - SMALL BUSINESS STATUS: S 6a. POINT OF CONTACT NAME AND TITLE: Mr. Carlos M. Flores. A.I.A. 6b, POINT OF CONTACT TELEPHONE NUMBER: (305) 670-1499 6e. POINT OF CONTACT E-MAIL ADDRESS: cmflores@emfintelgroup.com 7, NAME OF FIRM (If block 2a is a branch office): . 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8e. DUNS NUMBER NIA N/A N/A . STANDARD FORM 330 (6/2004) PAGE 24 2 FIRM (OR BRANCH OFFICE) CITY M' . . . 9. EMPLOYEES BY DISCIPLINE a. Function Code b. Discipline c( 1). No. of Employee c(2). No. of - Firm Employees - Branch 06 Architect 2 08 CADD Technician 1 16 Construction Manager 1 18 Cost Estimator 1 37 Interior Designer 42 Mechanical En~ineer 1 47 Planner: Urban/Regional 48 Project Manager 53 Scheduler Other Employee 6 Total STANDARD FORM 330 (6/2004) PAGE 25 - . e 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL LAST 5 YEARS a. Profile Code b. Experience c. Revenue Index below} AOG Airport 2 A 11 Auditorium; Theater 1 COS Child Care ; Development Facilities 1 COG Churches; Chapels 1 C10 Commercial Buildings{low rise); Shoppina Centers 4 C11 Community Facilities 1 C1S Construction Management 4 C18 Cost Estimating 1 004 Design-Build 1 007 Dinina Halls, Clubs; Restaurants 3 E02 Educational Facilities; Classrooms 2 EOS Elevators; Escalators; People Mover 1 F03 Fire Protection 1 G01 Garages; Vehicles; Maintenance Facilities 1 PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,00 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. 7. 8. 9. 10. $2 million to less than $5 million $ 5 million to less than $10 million $10 million to less than $25 million $25 million to less than $50 million $ 50 million or greater 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown above) 11 a. Federal Work: 0 11 b. Non-Federal Work: Yr. 2006 - $230,685; Yr.2005 - $201,320; Yr. 2004 - $188,085 11 c. Total Work: Yr. 2006 - $230,685; Yr. 2005 - $201,320; Yr. 2004 - $188,085 12. RESENT A TIVE. The foregoing is a statement of facts. 12a. SIGNATURE: 12b. DATE SIGNED: Octo / STANDARD FORM 330 (6/2004) PAGE 26