Loading...
HomeMy WebLinkAboutOrdinance 2004-196 ORDINANCE NO. 2004 . jjJ, AN ORDINANCE OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AMENDING ORDINANCE NUMBERS 2000-110 AND 2003-166; ADOPTING A REVISED FEE SCHEDULE FOR THE BUILDING DEPARTMENT, ATTACHED AS EXHIBIT "A"; PROVIDING THE CITY MANAGER WITH THE AUTHORITY TO REVIEW ANNUALLY ALL BUILDING DEPARTMENT FEES; PROVIDING FOR AN EFFECTIVE DATE; WHEREAS, by Ordinance Numbers 2000-110 and 2003-166, the City Commission adopted a fee schedule for the Building Department; and WHEREAS, the City Manager has the authority to review all Building Department fees to determine if an adjustment to the fee schedule should be recommended to the City Commission; and WHEREAS, based on in-depth review of the fee schedule, the City Manager is recommending an adjustment to the fee schedule as reflected in Exhibit "A", amending Ordinance Numbers 2000-110 and 2003-166. NOW, THEREFORE, BE IT ORDAINED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Adoption of Revised Fee Schedule. The revised building fee schedule, attached hereto as Exhibit "A" is hereby adopted for the City of Sunny Isles Beach. Section 2. Authority of City Manager. The City Manager and/or his designee are hereby directed to annually review the Building Department Fee Schedule to determine if an adjustment to the fee schedule should be recommended to the City Commission. Section 3. Effective Date. This Ordinance shall become effective ten (10) days after adoption upon second reading. PASSED and ADOPTED on First Reading the 18th day of March, 2004 PASSED and ADOPTED on Second Reading this lS~ay of ~"2004 , , ATI'EST: / ~~:~~ Jane A. Hines>, City Clerk (- APPROVED AS TO FORM AND LEGAL SUFFICIENCY ~"AP~..-A ....; n M. Dannhelsser City Attorney Vote: 5-0 Mayor Edelcup Vice Mayor Goodman Commissioner Brezin Commissioner Iglesias Commissioner Thaler Moved by: Co~M.\S"C)iUUL.. I~L~~I~t Seconded by: CC>>w\Ml $ ~ \010 (tl. &~ ~ '2..1 rJ v (Yes) V (Yes) ~(Yes) ~(Yes) ~(Yes) _ (No) _(No) _ (No) _(No) _ (No) 2 BUILDING DEPARTMENT FEE SCHEDULE AOOl A022 A023 A002 A003 [RES] A004 [COMM] AOO5 A024 A. GENERAL INFORMATION ON SPECIAL FEES, REFUNDS, EXTENSIONS AND CANCELLATIONS 1. DOUBLE FEES When work for which a permit is required is commenced prior to obtaining a permit, the permit applicant will be required to pay one hundred dollars ($100.00) plus a double permit fee. The payment of the required fee shall not relieve them from being subject to any of the penalties therein. The double fee requirements shall be applicable to all divisions of the Building Department as noted herein. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the building official's approval or the necessary permits shall be subject to a penalty of 100 percent of the usual permit fee in addition to the required permit fees. For second offense of doing work without a permit, the permit applicant shall be required to pay twice the double permit fees plus two hundred dollars [$200.00]. For each offense thereafter, the permit applicant shall be required to pay twice the double permit fee plus five hundred dollars [$500.00]. 2. RE-INSPECTION FEES A permit holder shall be entitled to an initial inspection for each mandatory inspection. All work shall be inspected and deficiencies shall be noted by the building inspector. When the work to be inspected is only partially complete, the inspection shall be performed on those portions of the work completed, provided that compliance with the Florida Building Code may be determined with respect to those portions. A permit holder shall pay a fee of $57.24 for each additional inspection required to assure compliance with the Florida-Building Code beyond the initial and one follow-up inspection. All additional inspection fees shall be paid prior to a final inspection being conducted and may be paid by mailing the required fee to the City of Sunny Isles Beach Building Department. 3. LOST, REVISED AND REWORKED PLANS FEE (a) LOST PLANS: When plans for new buildings and additions are lost by the owner or contractor, a recertification fee will be required to review, stamp and approve a new set of plans as a field copy. Such fee shall be based on 30 percent of the original building permit fee, with a minimum fee for Group I [single family residence] of $50.00 dollars and a minimum fee for all others of $90.00. (b) REVISEDPLANS PROCESSING FEE: (1) Major plan revision after permit is issued shall be subject to a fee of 50% of the original permit fee. (2) Minor plan revisions shall be subject to a fee at the rate of $1.00 per minute of time for each review that takes longer than 5 minutes. (3) Minor plan revision fee minimum fee $50.00. Exhibit" A " PAGE 1 OF 29 BUILDING DEPARTMENT FEE SCHEDULE A035 (c) A fee of $75.00 may be charged for failure to make required corrections previously indicated. (d) LOST PERMIT CARD FEE: A replacement fee of $30.00 shall be charged for the loss of a Permit Inspection Record Card after a permit has been issued. (e) Records of inspection results in excess of 5 pages - per page $1.00 A006 A036 4. REFUNDS, TIME LIMIT A TION, CANCELLATIONS The fees charged pursuant to this schedule, provided the same are for a permit required by Section 104.1.1 of the Florida Building Code, may be refunded by the Building Official subject to the following: (a) No refunds shall be made on requests involving: (1) permit fees of $100.00 or less; or (2) permits revoked by the Building Official or the Building Official under authority granted by the Florida Building Code, or permits cancelled by court order, or conditional permits; or (3) permits which have expired; or (4) permits under which work has commenced as evidenced by any recorded inspection having been made by the Building Department; or (5) the original permit holder when there is a change of contractor. (b) A full refund less $100.00 or 50% of the permit fee, whichever is greater, rounded to the nearest dollar, shall be granted to a permit holder who: Requests a refund, provided: (1) That the Building Department receives a written request from the permit holder prior to the permit expiration date; and (2) That the permit holder submits with such request the applicant's validated copy of such permit; and (3) That no work has commenced under such permit as evidenced by any recorded inspection and/or field inspection. (c) Where there is a change of contractor or qualifier involving a permit, the second permit holder shall pay a fee of $85.00 to cover the cost of transferring the data from the original permit to the second permit. When the original permit has expired under section 104.5 of Florida Building Code the original permit fee shall be paid. (d) A fee of $100.00 shall be paid by the permit holder who submits a written request for a permit extension as authorized under Florida Building Code under Section 304.3(b). PAGE 2 OF 29 BUILDING DEPARTMENT FEE SCHEDULE AOIO A012 (e) Where a permit has become null and void pursuant to paragraph 104.5.1 Florida Building Code, a credit of fifty percent (50%) of the permit fee shall be applied to any re-application fee for a permit covering the same project and involving the same plans, provided that the complete re-application is made within six (6) months of the expiration date of the original permit, and provided that no refund had been made as provided in this Section. (f) Permit applications filed under Ordinance 97-107. A014 Where a permit has become null and void in accordance with paragraph 104.5 of the Florida Building Code, a credit of 50% of the permit fee shall be applied to any re-application fee for a permit covering the same project provided that no refund has been granted. A008 Impact fees are assessed on certain building permits, including re-application on expired permits, (contact the Impact Fee Section for details). A009 Other agencies including, but not limited to, the Department of Environmental Resources Management, Miami-Dade Fire Rescue Department, Building Code Compliance Office and the Florida Department of Health assess fees on building permits, including re-application on expired permits (contact the applicable agencies for details). PAGE 3 OF 29 BUILDING DEPARTMENT FEE SCHEDULE 5. SPECIAL PROJECTS: A fee equal to actual staff time and related costs shall be assessed for special projects requiring research by the Building Department in order to answer questions proposed by developers, attorneys, realtors, or municipalities, etc., in connection with the use, re-subdivision, and development of properties, or to determine if any existing violations are on the property through a review of departmental records. Such special fee only will be levied for requests outside the scope of normal departmental work. A minimum fee of $60.00 shall be charged. A fee equal to $2.00 per page shall be assessed fro pre-programmed computer reports on Building Department records. The minimum fee shall be $50.00. X022 6. GENERAL INFORMATION (a) A $0.01 per square foot fee will be added to building permits for the State of Florida to study building code requirements for radon gas, and certification and regulation of building code administrators, plans examiners and inspectors. (b) A fee of six (6) percent (for concurrency review) of the total permit fee will be added to original fees where a concurrency review was performed. (c) Impact fees are assessed on certain building permits, including re-application on expired permits (contact the Impact Fee Section for details on these fees). A037 7. INSPECTIONS REQUIRING OVERTIME Charges for construction inspections, which are requested in advance and which require that employee work overtime will be at a rate of $75.00 per hour and in accordance with applicable employee contracted bargaining agreements. 8. FEES BASED ON ESTIMATED COST - DOCUMENTATION REQUIREMENTS The Building Department may require the permit applicant to submit appropriate documentation as proof of estimated cost of construction used to compute permit fees. 9. TRAINING AND EDUCATIONAL FEES All permits for new construction, alterations or additions shall be accom anied b a ent of training and educational fee of one -l% .. of permit fee cost. All fees collected pursuant hereto shall be set aside to offset the cost of training and education of personnel in the regulation, inspection and enforcement of the South Florida Building Code Florida Building Code. 10. CERTIFICATES OF COMPLETION AND TEMPORARY CERTIFICATES OF COMPLETION FEES Fee for Certificates of Completion and Temporary Certificates of Completion issued by the Building Department will be assessed in accordance with the Department of Planning and Zoning Fee Schedule. BUILDING DEPARTMENT FEE SCHEDULE B001 B115 B090 B002 11. TECHNOLOGY FEES All permits for new construction, alterations or additions shall be accom anied b a ent of a ~f 2.6% of permit fee east _. All fees collected pursuant hereto shall be set aside to offset the cost of computer system purchases or technology expenditures within the building department. 12. PRE-SUBMITAL REVIEW FEES A fee of $52.00 per hour will be assessed for Building, Electrical, and Mechanical, Plumbing and Zoning review when the customer elects to submit plans for pre-submittal review. The regular $115.00 per hour fee will be charged for structural and landscaping pre-submittal review. Refer to the Professional Fee Ordinance. 13. STRUCTURAL ENGINEER PLAN REVIEW A fee of $115.00 per hour will be assessed for plan reVIew for all new construction and alteration/repair that involve structural review. 14. LANDSCAPING ARCHITECTUAL REVIEW The regular $115.00 per hour fee will be charged for landscaping review. B. BUIWING PERMIT FEES Fees listed in Subsection (B) include only building permit fees and do not include fees for plumbing, electrical, and mechanical fees which are listed in the following sections: 1. "UP-FRONT" PROCESSING FEE When the building permit application is received for the construction of a new Single Family Residence or Duplex, the applicant shall pay an "up-front" processing fee equal to $0.15 for each square foot or fractional part thereof, or $0.02 per dollar in estimated value or fractional part when square footage does not apply. When a building permit application is received for a commercial project, the applicant shall pay an "up-front" processing fee equal to $4.60 per 100 square feet or fractional part or $0.75 for each $100.00 of estimated value or fractional part thereof. This processing fee is not refundable, but shall be credited toward the final building permit fee. PAGE 5 OF 29 BUILDING DEPARTMENT B091 B092 B093 B094 B095 B096 B097 B093 B094 B095 B096 B097 2. MINIMUM FEE FOR BUILDING PERMIT The minimum fee for all building permits is applicable to all items in this section except as otherwise specified. (With the exception of fees associated with windows, trusses, doors, skylights and all required shop drawings, which are already included in the basic building permit fee, this minimum fee does not apply to add-on building permits issued as supplementary to current outstanding permits for the same job.) 3. NEW BUILDINGS OR ADDITIONS New construction Single Family and Duplex above 1000 sq. ft. - Group I per sq. ft. Prefabricated utility sheds with slab (Max 100 sq. ft. of floor area). Single Family and Duplex (Group n - Attached Structures o to 100 sq. ft. in floor area. 101 to 300 sq. ft. in floor area. 301 to 500 sq. ft. in floor area. 501 to 1000 sq. ft. in floor area. Single Family and Duplex (Group n Attached Structures Above 1000 sq. ft. per sq. ft. Single Family and Duplex (Group n Detached Structures o to 100 sq. ft. in floor area. 101 to 300 sq. ft. in floor area. 301 to 500 sq. ft. in floor area. 501 to 1000 sq. ft. in floor area. Single Family and Duplex (Group I) Detached Structures Above 1000 sq. ft. per sq. ft. FEE SCHEDULE $100.00 - $ 0.35 75.00 $100.00 135.00 160.00 250.00 $ 0.35 100.00 135.00 160.00 250.00 0.35 PAGE 6 OF 29 BUILDING DEPARTMENT FEE SCHEDULE B098 B099 B100 BOOS B006 BIOI B008 B102 B009 B103 Alterations or repairs to Single Family Residence or Duplex (Group I) per $1.00 of estimated cost or fractional part. Minimum Fee Repairs due to fire damage per $1.00 of estimated cost or fractional part (copy of construction contract required). Minimum Fee Storage & Industrial Use of Group E & F occupancies 100 sq. ft. or fractional part of floor area. Shade Houses per 100 sq. ft. or fractional part of floor area. Greenhouses & buildings for agricultural uses (non-residential) when located on the premises so used per 100 sq. ft. or fractional part of floor area. Mobile Home additions - each 100 sq. ft. or fractional part of floor area. NEW CONSTRUCTION COMMERCIALlMUL TI- FAMILY RESIDENTIAL ~ FOR STRUCTURES OF UNUSUAL SIZE OR NATURE SUCH AS ARENAS, STADIUMS AND WATER AND SEWER PLANTS THE FEE SHALL BE BASED ON 1/2 OF 1% OF THE ESTIMATED CONSTRUCTION COST. $ 0.08 175.00 .09 275.00 15.00 1.00 $5.75 6.95 .. 4. NEW CONSTRUCTION OTHER THAN AS SPECIFIED HEREIN: (WATER TOWERS, PYLONS, BULK STORAGE-TANK FOUNDATIONS, UNUSUAL LIMITED-USE BUILDINGS, MARQUEES, AND SIMILAR CONSTRUCTION) For each $1,000 of estimated cost or fractional part. 5. ALTERATIONS AND REPAIRS TO BUILDINGS AND OTHER STRUCTURES (EXCEPT GROUP I) For each $100 of estimated cost or fractional part. Minimum Fee 6. MOVING BUILDINGS OR OTHER STRUCTURES $ 9.50 $ 2.50 300.00 PAGE 7 OF 29 BUILDING DEPARTMENT FEE SCHEDULE BOl2 BOl3 BI04 BIOS B116 B117 Bl23 Bl24 BI07 BIOS Bll0 For each 100 sq. ft. or fractional part thereof (does not include cost of new foundation or repairs to building or structure) $15.00 7. SLABS 100.00 8. ROOFING (INCLUDING RE-ROOFING) Group I and H Occupancy Roofing shingle and other roof types not listed per sq. ft. of roof coverage including overhangs. $ 0.08 Roofing tile 0.10 100.00 Minimum Fee per roofing category All other occupancies Roofing shingle and other roof types not listed Per sq. ft. up to 30,000 sq. ft. 0.08 Each sq. ft. thereafter Roofing tile Per sq. ft. up to 30,000 Each sq. ft. thereafter 0.06 0.10 0.08 9. FENCES AND/OR WALLS Chain link o - 500 linear ft. 501 - 1000 linear ft. each additional linear ft. over 1000 100.00 140.00 0.10 Wood each linear ft. 0.65 Concrete each linear ft. 1.25 10. SWIMMING POOLS. SPAS. AND HOT TUBS 20,000 gallons and under Each additiona11,000 gallons or fraction thereof Pool decks $230.00 4.50 112.00 11. TEMPORARY PLATFORMS AND TEMPORARY BLEACHERS TO BE USED FOR PUBLIC ASSEMBLY PAGE 8 OF 29 BUILDING DEPARTMENT FEE SCHEDULE BOI9 For each 100 sq. ft. or fractional part of platform area For each 100 linear feet or fractional part of seats $ 5.25 BOI8 4.50 12. DEMOLITION OF BUILDINGS B020 500 Sq. feet and under Over 500 sq. feet, per thousand or fraction thereof 100.00 10.00 13. SHOP DRAWING REVIEW (FOR OTHER THAN GROUP I) B022 (a) Trusses/Steel Structures $ 12.75 First 600 sq. ft. or fractional part Each additional 100 sq. ft. or fractional part 1.25 Minimum Fee 100.00 B023 (b) PrecastlPrestress $ 8.00 (Roof-Floor-Walls) each 1,000 sq. ft. or fractional part B024 c) Overhead Doors each 8.00 B025 (d) Skylights each 8.00 B027 (e) Hand Rails/Stair Rails Per linear ft. 1.25 B035 (f) StorefrontlFixed Glazing (Under 8 ft. high by 4 ft. wide) each 100 sq. ft. or part 8.75 (g) Walk-in Coolers each 100.00 14. INSTALLATIONIREPLACEMENT OF WINDOWS OR DOORS B083 Window installation, alteration or repair - per sq. ft. of window or door area (except new construction for Group I). $ 0.07 Minimum Fee 100.00 Replacement of Windows and Exterior Doors in all buildings or installation of windows or doors in buildings exceeding two stories in height; or PAGE 9 OF 29 BUILDING DEPARTMENT B082 Storefronts and fixed glass exceeding 8 feet in height; or 4 feet in vertical mullion spacing; or B084 Curtain Walls including windows and doors therein. For each 100 sq. ft. or fractional part 15. SCREEN ENCLOSURES, CANOPIES & AWNINGS B036 (a) Screen enclosures Each 100 sq. ft. or fraction B037 (b) Free standing canopies For each $1,000 of estimated cost or fractional part Minimum Fee B038 (c ) Awnings and Canopies Horizontal projection per sq. ft. area covered Minimum Fee B111 (d) Storm Shutters - per sq. ft. area covered Minimum Fee B039 16. TIE DOWN Tie Down Inspection Fee: (This does not include installation of meter mounts and service equipment. Separate mechanical, plumbing and related electrical permits are required). B040 17. AGRICULTURAL "V-PICK" PERMITS Each permit per field 18. SIGN PERMIT FEES (a) Minimum sign fee G028 (b) Signs-non-illuminated (per sq. ft.) (llluminated signs under electrical permits) SOlO (c) Annual Renewal of Class C signs on or before October 1st of each year (per sign) FEE SCHEDULE $ 8.75 $ 12.00 12.00 100.00 0.15 100.00 0.20 100.00 100.00 105.00 100.00 1.25 30.00 PAGEIOOF29 BUILDING DEPARTMENT FEE SCHEDULE 19. SATELLITE DISH B112 All trades each 150.00 B113 20. ORNAMENTAL IRON Per sq. ft. of coverage 0.10 Minimum Fee 100.00 B114 21. ADDITIONAL INSPECTIONS 65.00 65.00 AOO2 22. TIE DOWN RE-INSPECTION FEE 23. DOCKS 20 feet and under Each additional foot or fraction thereof 100.00 3.00 24. FUEL/OIL TANK 1,000 gallons and under Each additional 1,000 gallons or fraction thereof All wholesale storage tanks based on cubic contents at commercial building rates. Removal of tanks, per tank 11.50 11.50 25.00 25. PA VINGIRESURFACING (commercial and residential) 500 sq. feet and under Each additional 1,000 sq. feet or fraction thereof up to 2,500 sq. feet Each additional 1,000 sq. feet or fraction thereof over 2,500 sq. ft. (Maximum for resurfacing is 165.70) If over 5,500 sq. feet 100.00 30.00 1.90 PAGE 11 OF 29 BUILDING DEPARTMENT 26. PILING Dolphin pile, each 27. SEA W ALLSIRETAINING WALLS 50 feet and under Over 50 feet, per foot 28. TENTS (temporary, carnivals, etc.) 30-day maximum 29. LANDSCAPING When application for a landscaping and tree removal permit is approved and before a permit is issued, a fee therefore shall be paid based on the following schedule of rates. Other fees, as referenced throughout this division, are also applicable before, during, and after permit issuance. 1. Minimum fee 2. General landscaping, per sq. ft. of required landscaping 3. Residences (new) Single - family Duplex 4. Landscaping for code compliance 5. Tree removal, per tree C. PLUMBING PERMIT FEES 1. MINIMUM PLUMBING OR GAS FEE PER PERMIT Except as otherwise specified (This minimum does not apply to supplemental plumbing permits issued as supplementary to current outstanding permits for the same job.) FEE SCHEDULE 14.00 110.00 1.50 60.00 100.00 0.0175 100.00 100.00 138.67 16.12 $ 75.00 - PAGE 12 OF 29 BUILDING DEPARTMENT FEE SCHEDULE 2. RESIDENTIAL PLUMBING (GROUP I) POSl New Single Family Residence or Duplex (Group I) per sq. ft. 0.10 POS2 Addition to Single Family Residence or Duplex (Group I) per sq. ft. 0.10 Minimum Fee 100.00 POS3 Alterations or repairs to Single Family Residence or Duplex (Group I) per $1.00 of estimated cost or fractional part 0.05 Minimum Fee 100.00 3. COMMERCIAL (ALL GROUPS EXCEPT GROUP I) ROUGHING-IN OR PLUGGED OUTLETS FOR BATHTUBS, CLOSETS, DOCTORS, DENTISTS, HOSPITAL STERll..IZERS, AUTOCLAVES, AUTOPSY TABLES AND OTHER FIXTURES, APPURTENANCES OR OTHER APPLIANCES HAVING WATER SUPPLY OR WASTE OUTLET, OR BOTH, DRINKING FOUNTAINS, FIXTURES DISCHARGING INTO TRAPS OR SAFE WASTE PIPES, FLOOR DRAINS, LAUNDRY TUBS, LAVATORIES, SHOWERS, SINKS, SLOP SINKS, URINALS, AND WATER HEATERS POOl For each roughing-in or plugged outlet $ 8.00 P032 Fixtures set on new roughing-in or plugged outlets or replaced on old roughing-in: Each fixture 8.00 Minimum Fee 100.00 PO02 4. SEPTIC TANKS, SETTLING TANKS, GAS AND OIL INTERCEPTORS, AND GREASE TRAPS (Including tank abandonment, drain tile and relay for same) $ 75.00 P04l 5. SEWER PO03 Each building storm sewer and each building sewer where connection is made to a septic tank, or a collector line or to an existing sewer or to a city sewer or soakage pit or to a building drain outside a building 60.00 60.00 PO04 Sewer CappinglDemolition 6. CONDENSATE DRAIN (AIR CONDITIONING) PO09 Per outlet 4.15 Except single not manifold NC outlet not exceeding 5 tons N/C PAGE 13 OF 29 BUILDING DEPARTMENT POlO POll POl2 POl3 P054 P055 POl5 P035 P056 P033 P034 POl6 P057 P058 POl8 POl9 7. WATER PIPING Water service connection to a municipal or private water supply system (for each meter on each lot) Minimum Fee Water connection or outlets for appliance or installations not covered by fixture set above Minimum Fee Irrigation system and underground sprinkler system for each zone Minimum Fee Solar water heater installation, equipment replacement or repair Swimming pool piping, not including well (new installation) Minimum Fee Residential Commercial Sump pump Swimming pool heater each Swimming pool maintenance each 2" or less water service backflow assembly 2 1/2" or larger water service backflow assembly Repairs to water piping: For each $1,000 estimated cost or fractional part 8. WELLS Residential wells per well Commercial wells per well 9. NATURAL GAS OR A LIQUIFIED PETROLEUM For each outlet Group I (includes meters and regulators) For each appliance (does not include warm air heating units, but does include unvented space heaters and vented wall heaters-no duct work)-- (See Fee Section E(3) for heating) FEE SCHEDULE $ 8.00 100.00 6. ()() 100.00 16.80 100.00 90.00 100.00 $ 75.00 100.00 8.00 50.00 60.00 50.00 75.00 7.00 75.00 100.00 $ 8.00 8.00 PAGE 14 OF 29 BUILDING DEPARTMENT P061 P062 P020 P021 P022 P037 P024 P025 P026 P027 P028 P029 P030 P031 P036 P040 FEE SCHEDULE Other Groups For each outlet (includes meters and regulators) 15.00 For each appliance (does not include warm air heating units, but does include unvented space) Heaters and vented wall heaters-no duct work (See Fee Section E (3) for heating) For each meter (new or replacement) $ 15.00 15.00 8.00 For major repairs to gas pipe where no fixture or appliance installation is involved Underground L.P. gas tanks per group of tanks at a single location $ 50.00 75.00 Above ground L.P. gas tanks per group of tanks at a single location 100.00 10. WATER TREATMENT PLANTS, PUMPING STATIONS, SEWER TREATMENTS AND LIFT STATIONS Water treatment plant (interior plant piping) Sewage treatment plant (interior plant piping) Lift station (interior station piping) Sewage ejector 250.00 200.00 300.00 100.00 11. WATER AND GAS MAINS (On private property and other than public utility easements) Each 50 feet or part thereof $10.00 Minimum Fee 100.00 12. STORM/SANITARY UTILITY/COLLECTOR LINES FOR BUILDING DRAIN LINES (On private property other than public utility easements) Each 50 feet or part thereof $10.00 15.00 100.00 Each manhole or catch basin Minimum Fee 13. TEMPORARY TOILETS-WATERBORNE OR CHEMICAL First temporary toilet For each additional (Renewal of temporary toilet - same charge as original permit). 75.00 10.00 PAGE 15 OF 29 BUILDING DEPARTMENT FEE SCHEDULE 14. DENTAL VACUUM LINES P038 Each system 15. MOBILE HOME CONNECTIONS 75.00 P039 Each unit 75.00 P060 17. ADDITIONAL INSPECTIONS 65.00 D. ELECTRICAL PERMIT FEES 1. MINIMUM ELECTRICAL PERMIT FEE INCLUDING REPAIR WORK PER PERMIT Except as otherwise specified $85.00 (This minimum does not apply to add-on electrical permits issued as supplementary to current outstanding permits for the same job and demolition work). 1a. ONE-ITEM LOW COST PERMIT FEE A permit fee for a one-item permit with a cost of $1,000 or less $35.00 G034 2. PERMANENT SERVICE TO BillLDINGS - New work only (The following fee shall be charged for total amperage of service) For each 100 amp. or fractional part $ 9.00 G033 3. FEEDERS (Includes feeders to panels, M.C.C., switchboards, generators, automatic transfer switches, elevators, etc.) Each feeder $15.00 G035 4. AGRICULTURAL SERVICE (permanent) Per service 50.00 G002 5. TEMPORARY SERVICE FOR CONSTRUCTION Per service 85.00 PAGE 16 OF 29 BUILDING DEPARTMENT FEE SCHEDULE G036 6. CONSTRUCTION FIELD OFFICE SERVICE Per service 130.00 G037 7. MOBILE HOME OR RV SERVICE (residential) Per service 85.00 8. TEMPORARY SERVICE TEST (commercial only) G031 (a) Equipment and service (30 day limit) per service 100.00 G038 (b) Elevator (180 day limit) per elevator 100.00 9. RESIDENTIAL WIRING (New construction of Group I and living units of Group H. Applies to all electrical installations except common areas, parking lot areas and/or buildings and house service of Group H). G080 For new construction and additions for each sq. ft. of floor area $ 0.08 Minimum Fee 100.00 G081 Alterations or repairs per $1.00 estimated cost or fractional part 0.05 Minimum Fee 100.00 10. ALL OTHER WIRING AND OUTLETS Common areas of Group H include corridors, public lounges, elevators, pumps, NC (public area), lights, outlets, and house and emergency service, etc. These areas and all other commercial wiring shall be subject to the fees below: PAGE 17 OF 29 BUILDING DEPARTMENT FEE SCHEDULE G005 (a) Boxes, receptacles, switches, sign, fractional motor, fans, low voltage outlets, empty outlets for telephone, CATV, each outlet, and 110 volt smoke detectors each outlet box $ 1.75 G082 (b) Special outlets 9.00 G041 (c) Commercial equipment (KW A rated), x-ray outlets, commercial cooking equipment, presses, generators, transformers (permanently connected) 9.00 For each 10 KW or fractional part 10.00 G083 (d) Motors installed, repaired or replaced (fractional already covered on general outlets) Each motor (d) Air conditioning and refrigeration system (new work). Applies to commercial, residential, agricultural and industrial. Covers related work, except wall or window units, which are covered under special outlets. G008 (1) Per ton or fractional part thereof $ 7.00 G044 [KW] (2) Replacement or relocation of existing NC and refrigeration units ( same size) G043 [TON] G045 Per KW or ton 4.00 (f) Electrical equipment - replacement (existing facilities) Switchboards, M.C.C., panels, control boards (for each board) 20.00 11. LIGHTING FIXTURES Common areas of Group H include corridors, public lounges, elevators, pumps, NC (public area), lights, outlets, and house and emergency service, etc. These areas and all other commercial wiring shall be subject to the fees below: PAGE 18 OF 29 BUILDING DEPARTMENT FEE SCHEDULE Floodlights, spotlights, parking lights, tennis court lights, fluorescent and incandescent fixtures, etc. G009 GOlO (a) Per fixture $ 1.75 b) Plugmold, light track, and neon strips. Each 5 ft. or fractional part 5.00 G084 Light pole (Group I) per pole 12.00 G085 Light pole (commercial) per pole 17.00 12. SIGNS & ARCIDTECTURAL FEATURES (Indoor Neon's) G013 Per sq. ft. of sign $ 1.50 Minimum Fee 100.00 G014 Repairs and re-connection each 90.00 5.00 G05l Neon strips each 5 ft. or fractional part G086 13. TEMPORARY WORK ON CIRCUSES, CARNIVALS, FAIRS, CHRISTMAS TREE LOTS, FIREWORKS, ETC. Per ride or structure $ 50.00 Minimum Fee 200.00 14. FIRE DETECTION SYSTEM (Needs category 04 processing) PAGE 19 OF 29 BUILDING DEPARTMENT G087 Includes fire alarm systems, halon, etc. Does not include single 1l0-volt residential detectors. G088 G020 Per Device Per system (for new and upgrades) Repairs and additions to existing systems per system 15. MASTER TELEVISION ANTENNA AND RADIO SYSTEM Does not include CATV and telephone empty conduit system. Does include free wiring of same. Master control G025 Each device G089 (Res) GI04 (Comm) G090 (Res) GI03 (Comm) GI05 (Res) GI06 (Comm) G09l (Res) GI07 (Comm) G092 G093 G094 16. BURGLAR ALARM SYSTEM Installation wiring Installation devices Complete System Repair per system 17. INTERCOM SYSTEM Includes residential, nurse call, paging, etc.: Each new system - Group I Other groups Repair each system FEE SCHEDULE 1.75 150.00 100.00 35.00 1.50 60.00 120.00 60.00 60.00 $ 60.00 90.00 60.00 PAGE 20 OF 29 BUILDING DEPARTMENT G095 G096 G026 G056 G027 G059 G097 G098 G099 G076 G073 GIOI G077 GI02 18. ENERGY MANAGEMENT SYSTEM Per floor Repair per floor 19. SWIMMING POOLS, ELECTRICAL Fee based on cumulative cost of the following components: (a) Residential pool or spa (Group I) (includes motor and pool lights) (b) Residential combination pool/spa (includes motors and pool lights) (c) Commercial and multi-family dwelling pool or spa (d) Commercial, multi-family dwelling combination pool/spa Repair residential (Group I) pool Repair commercial pool 20. FREE STANDING SERVICE - New meter and service (requires processing) - per service Includes lift stations, sprinkler systems, street lighting, parking lots, etc., that require new service with separate meter. 21. CONDUIT DUCTBANK-PER LINEAR FOOT 22. GROUND WIRE FOR SCREEN BONDING-PER NSTALLA TION 23. FPL LOAD MANAGEMENT PER BID 24. UNDERGROUND MANHOLES 25. ADDITIONAL INSPECTIONS E. MECHANICAL PERMIT FEES 1. MINIMUM MECHANICAL PERMIT FEE Except as otherwise specified (This minimum does not apply to add-on mechanical permits issued as supplementary to current outstanding permits for the same job.) FEE SCHEDULE 105.00 60.00 107.00 167.00 150.00 203.00 60.00 140.00 90.00 1.80 60.00 60.00 100.00 65.00 $ 85.00 PAGE 21 OF 29 BUILDING DEPARTMENT M053 M054 MOOl M055 M002 FEE SCHEDULE - 2. MECHANICAL SINGLE FAMILY RESIDENCES AND DUPLEXES (GROUP I INCLUDES CATEGORIES 03, 10 AND 41) New construction per sq. foot $ 0.08 Additions to Single Family Residences and Duplex (Group I) and Duplex per sq. foot 0.08 Minimum Fee 100.00 3. AIR CONDITIONING AND REFRIGERATION, INCLUDING THE RELOCATION OF EQUIPMENT Separate permits are required for electrical, water and gas connections For each ton capacity or fractional part thereof $ 16.00 Minimum Fee 100.00 Room AlC wall unit 37.45 4. FURNACES, HEATING EQUIPMENT AND POOL HEATERS INCLUDING COMMERCIAL DRYERS, OVENS AND OTHER FIRED OBJECTS NOT ELSEWHERE CLASSIFIED (Includes all component parts of the system except fuel and electrical lines.) For vented and unvented wall heaters, see Item C (check 8 above) For each KW $ 3.20 Minimum Fee 100.00 PAGE 22 OF 29 BUILDING DEPARTMENT FEE SCHEDULE 5. FIRE SPRINKLER SYSTEM M003 Per standpipe 21.40 M004 Per sprinkler head 1.07 MOOS Per hose rack or hose bib 10.70 M06S Fire pump 80.25 M009 Each 50 ft. of underground piping or part thereof 21.40 100.00 Minimum Fee MOIO 6. STORAGE TANKS FOR FLAMMABLE LIQUIDS Per tank 160.00 MOll 7. INTERNAL COMBUSTION ENGINES Stationary - each 100.00 M036 8. COMMERCIAL KITCHEN HOODS Each 133.75 9. OTHER FEES M048 (a) Fire chemical halon and spray booths for each Per system 112.35 MOl2 (b) Insulation, trash chute tube, conveyor systems, pressure and process piping, sheet metal or fiberglass air conditioning ducts, cooling towers, mechanical ventilation For each $1,000 or fractional part of contract cost $ 11.25 Minimum Fee 100.00 MOS6 (c) Ductless fan each 33.17 MOS8 10. ADDITIONAL INSPECTIONS 65.00 PAGE 23 OF 29 BUILDING DEPARTMENT M059 M060 M052 M061 M037 M039 M040 M041 M042 MOl4 M067 M066 MOl5 MOl6 MOl7 M063 M064 M020 F. ELEVATORS, ESCALATORS AND OTHER LIFTING APPARATUS Fee for original installation or major alterations and remodeling (includes initial inspection and certificate) 1. PASSENGER AND FREIGHT ELEVATORS New elevator traction - each New elevator hydraulic - each Freight elevator - each Residential elevator - each Escalator Dumbwaiters - each Wheelchair lift - each Man lift - each Conveyors and all other lifting and transporting apparatus (except as otherwise provided) - each drive Major alterations and remodeling for an elevator, first two landings Each landing thereafter - per floor Refinish cab interior (no electrical work) Vertical conveyor Elevator for construction use only, 30 day limit Key box each 2. FEES FOR PERIODIC RE-INSPECTIONS Passenger elevator (annual inspection per Code) Freight elevators (annual inspection per Code) Escalators Dumbwaiters, wheelchair lifts and all other lifting and transporting apparatus vertical conveyors (annual inspection per Code) FEE SCHEDULE $ 600.00 450.00 600.00 360.00 240.00 150.00 180.00 300.00 $ 100.00 100.00 10.00 150.00 180.00 150.00 50.00 $ 150.00 150.00 75.00 75.00 PAGE 24 OF 29 BUILDING DEPARTMENT M021 M022 M023 M049 M050 M051 M027 M028 M029 M030 M031 M032 M033 M034 M035 FEE SCHEDULE 3. AMUSEMENT RIDES AND DEVICES Per ride 95.00 For each permanent unit installed or altered 75.00 Annual inspection for each ride or device at anyone location (permanent installation only) 75.00 G. BOILERS AND PRESSURE VESSELS Installation permits fees (including initial inspections and certificate). Does not include installation or connection of fuel and water lines. 1. BOILERS The following fees apply to each boiler to be installed: Boilers less than 837 MBTU - each $ 85.87 Boilers 837 MBTU to 6,695 MBTU - each 103.05 Boilers 6,695 MBTU and up - each 143.12 Steam driven prime movers - each 68.70 68.70 Steam actuated machinery - each Unfired pressure vessels (operating at pressures in excess of 60 PSI and having volume of more than 5 cu. ft.) each pressure vessel 85.87 2. FEES FOR PERIODIC RE-INSPECTIONS Steam boilers (annual) - each $ 143.12 Hot water boilers (annual) - each 59.54 Unfired pressure vessels (annual) - each 52.67 Miniature boilers (annual) - each 52.67 Certificate of inspection (where inspected by insurance company) - each 85.87 Shop inspection of boiler or pressure vessels per completed vessel 85.87 PAGE 25 OF 29 BUILDING DEPARTMENT FEE SCHEDULE H. COST OF PUBliCATIONS AND RECORDS X046 I.FLORIDA BUILDING CODE FLORIDA BUILDING CODE, OTHER CODE BOOKS, SUPPLEMENTS AND DEPARTMENTAL PUBLICATION FEES X003 X004 X030 X005 X006 X007 - The charge for each copy of the Florida Building Code, other code books or supplements thereto or other departmental publications shall be assessed by the Building Department in the amount equal to the low bid printing cost plus the demonstrable cost to the Building Department of selling and distributing such code books, code supplements or departmental publications. The charge for publications of Construction Lien Law information is limited to $5.00 per copy of publication as permitted under Chapter 713 of the Florida Statutes. 2. COPIES OF DEPARTMENTAL RECORDS Plan reproductions from microfilm - per sheet $ 5.00 Reproduced records - per page 0.15 Double sided copies - per page 0.20 Certified copies - per page 1.00 Notary public service - per document 1.00 Research and ordering plans 5.00 II PAGE 26 OF 29 BUILDING DEPARTMENT FEE SCHEDULE I. PREMISE PERMIT FEES In accordance with provisions of the Florida Building Code and Chapter 10 of the Code of Miami-Dade County, each firm or organization in Miami-Dade County which performs its own maintenance work with certified maintenance personnel, as well as helpers thereunder, may pay to Miami-Dade County an annual Master and Subsidiary Premise Permit fee in lieu of other fees for maintenance work. Such fee shall be paid to the Building Department and such permit shall be renewed annually at a fee, which is calculated in accordance with the provisions of this sub-section. 1. CALCULATION OF THE INITIAL MASTER PREMISE PERMIT FEE KOOl Each firm or organization which obtains an annual master premise permit shall include in their application for such permit the total number of maintenance personnel, including helpers and trainees thereunder, assigned to building, electrical, plumbing or mechanical work. The Master Premise Permit fee shall be computed by multiplying the total number of such employee's times [$53.50 during fiscal year 1999-2000 and $57.25 during fiscal year 2000- 2001]. The minimum Master Premise Permit fee shall be [$1011.15 during fiscal year 1999- 2000 and $1081.94 during fiscal year 2000-2001]. 2. CALCULATION OF THE INITIAL SUBSIDIARY PREMISE PERMIT FEE K002 Each firm or organization, which utilizes decentralized locations in addition to the main location described under Point 1 above, may additionally apply for a Subsidiary Premise Permit for each such decentralized location. Such application for a Subsidiary Premise Permit shall include the same information required in Point 1 above. The Subsidiary Premise Permit fee shall be computed by multiplying the total number of such employee's times [$53.50 during fiscal year 1999-2000 and $57.25 during fiscal year 2000-2001]. The minimum Subsidiary Premise Permit fee shall be [$283.55 during fiscal year 1999-2000 and $303.40 during fiscal year 2000-2001]. 3. RENEWAL OF PREMISE PERMIT K003 Prior to all premise permit expiration, the holder will be sent a renewal notice to continue the Premise Permit for the next renewal period. The calculation of the renewal Premise Permit fee shall be the same as the method used to calculate the original Premise Permit fee. No allowances shall be made for late renewal fees or part year renewal fees. PAGE 27 OF 29 BUILDING DEPARTMENT A038 J. 40-YEAR RE-CERTIFICATION FEES For every application for 40-year re-certification under Section 104.9 of the Florida Building Code there shall be paid to the Building Department, for the processing of each application, a fee of $267.50 during fiscal year 1999-2000 and $286.23 during fiscal year 2000-2001. For every application for subsequent re-certification at lO-year intervals thereafter, there shall be paid to the Building Department for the processing of each application, a fee of $267.50 during fiscal year 1999-2000 and $286.23 during fiscal year 2000-2001. Recording Fees: as established by the Clerk of the Court (Recorder). K. STRUCTURAL GLAZING SYSTEMS RE-CERTIFICATION FEES X034 For the initial application for structural glazing re-certification and each subsequent application under Sections 104.9 and 3515 of the Florida Building Code, there shall be paid to the Building Department for the processing of each application, a fee of $267.50 during fiscal year 1999-2000 and $286.23 during fiscal year 2000-2001. L. ENFORCEMENT FEES 1. CONTRACTOR ENFORCEMENT Case Processing Fee - each Field Inspection Re-inspection Fee Photographs - each Lien Processing Fee Lien Settlement Fee 2. CRIMINAL PROCESSING RECOVERY COST Case Processing Fee Inspection - each Pictures Corporate Information Case Processing Fee Court Appearance - each Posting of Notices - each Lien Recordation/Cancellation of Notices - each FEE SCHEDULE $400.72 114.49 68.70 2.29 57.25 57.25 $400.72 68.70 2.29 22.90 228.98 68.70 34.35 40.08 PAGE 28 OF 29 BUILDING DEPARTMENT FEE SCHEDULE 3. FLORIDA BUILDING CODE FLORIDA BUILDING CODE - CHAPTER 2 (UNSAFE2 STRUCTURES) Case Processing Fee $ 400.72 2.29 Pictures - each Inspection Fee 125.94 85.87 40.08 Re-inspection Fee Posting of Notices - each Unsafe Structures Board Processing Fee 143.12 Title Search Actual Cost Court Reporting Transcription Actual Cost Legal Advertisement Actual Cost Permit Fees Actual Cost LienlRecordation/Cancellation of Notices - each Bid Processing Fee 40.08 114.49 Demolition/Secure Services Actual Cost Asbestos Sampling and Abatement Actual Cost Corporate Information 22.90 PAGE 29 OF 29