Loading...
HomeMy WebLinkAboutOrdinance 2006-268 ORDINANCE NO. 2006 - ?-'-P- AN ORDINANCE OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AMENDING CHAPTER 156 OF THE SUNNY ISLES BEACH CODE ENTITLED "FEES, MISCELLANEOUS"; ADOPTING A REVISED FEE SCHEDULE FOR THE BillLDING DEPARTMENT, ATTACHED AS EXHIBIT "A"; PROVIDING THE CITY MANAGER WITH THE AUTHORITY TO REVIEW ANNUALLY ALL BUILDING DEPARTMENT FEES; PROVIDING FOR REPEALER; PROVIDING FOR SEVERABILITY; PROVIDING FOR CODIFICATION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, by Section 156-1 of the Code of the City of Sunny Isles Beach, the City Commission adopted a fee schedule for the Building Department; and WHEREAS, the City Manager has the authority to review all Building Department fees to determine if an adjustment to the fee schedule should be recommended to the City Commission; and WHEREAS, based on in-depth review of the fee schedule, City Manger is recommending an adjustment to the fee schedule as reflected in Exhibit "A", amending Chapter 156 of the Sunny Isles Beach Code, NOW, THEREFORE, BE IT ORDAINED BY THE CITYCOMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Adoption of Revised Fee Schedule. The revised building fee schedule, attached hereto as Exhibit "A" is hereby adopted for the City of Sunny Isles Beach. Section 2. Authority of City Manager. The City Manager and/or his designee are hereby directed to annually review the Building Department Fee Schedule to determine if an adjustment to the fee schedule should be recommended to the City Commission. Section 3. Effective Date. This Ordinance shall become effective ten (10) days after adoption upon second reading. PASSED and ADOPTED on First Reading the ~ day of j.J 0.../. , 2006 PASSED and ADOPTED on Second Reading this ILj.j.~day of b~c ,2006. "("'T1.1..' ..,1Mrl', ~~A: , c' '/ \ "!i"k~~;':'l:\~<:, "'> I ' t/ 1:")_v~J'"'?"I) j/. " , ~ t' ","'{'\i'l;,~ ,?~\f.4 ~ .~\ y.~.:.~,:l.~W{~,' ..:ti~~t;1?:~: . " (',/"( " " ", i ' e,A':~f(ibes;iCMC, City Clerk or,\ .. r, J . --"'-:-> ''-.1 ';~~: 'i',;' \1,',' \ . () , ~~".). \l \.1>) ~..- ~)/ . .<..;.- ~ .1-~ \ \ tr'" ) 4 ~ I. .~,' APPROVED AS TO FORM AND LEGAL SUFFICIENCY Moved by: v, c.~ N\ ~o~--r+-H~.j c;. f? Seconded by: ~I"t\l"t\\ \:t' I DtJf.,Q., T t:.l..~(J.l'...s Vote: 5-0 Mayor Edelcup Vice Mayor Brezin Commissioner Thaler Commissioner Goodman Commissioner Iglesias ~(Yes) V (Yes) V(Yes) v{Yes) ~Yes) _(No) _(No) _(No) _(No) _(No) 2 ( . 1 Fee Code Building Department Fee Schedule Description Amount A. GENERAL INFORMATION ON SPECIAL FEES, REFUNDS, EXTENSIONS AND CANCELLATIONS 1. DOUBLE FEES A-OOl Any person who commences building, structural, $100.00 electrical, gas, mechanical or plumbing system work before obtaining the building official's approval by means of a City-issued permit shall be subject to a penalty of 100 percent (100%) of the usual permit fee in addition to the required permit fees. When work (for which a permit is required) is commenced prior to obtaining a permit, the homeowner will be required to pay the specified fee twice (double permit fee) to the Building Department before it will issue the permit plus penalty fee. The payment of the required fee shall not relieve the applicant from being subject to any other penalties therein (code enforcement fines may apply). The double fee requirements shall be applicable to all divisions of the Building Department as noted herein. A-002 If a permit applicant is found doing work without a $250.00 permit as stated above in A-DOl a second time, the permit applicant shall be required to pay twice the double fees plus the following amount. A-003 If a permit applicant is found doing work without a $500.00 permit as stated above in A-DOl a third time and any other time thereafter, the permit applicant shall be required to pay twice the double permit fee plus the following amount. 2. RE-INSPECTION FEES A-004 Upon receipt of a permit, the permit holder shall be entitled to one (1) initial inspection for each mandatory inspection. All work shall be inspected and if any deficiency is found it shall be noted by the inspector for correction by the contractor. When the work described on the permit is partially completed, an inspection shall be performed on those portions $65.00 Exhibit "A" Building Department Fee Schedule - n Page 1 of 34 Building Department Fee Schedule of the work completed, provided that compliance with the Florida Building Code may be determined with respect to those portions. If an inspection is required to assure compliance with the Florida Building Code once the initial inspection and one (1) follow-up inspection have been done, the permit holder shall pay a fee for each additional inspection. All such re-inspection fees shall be paid prior to any re-inspection taking place and the final inspection being conducted. Payment should be in person at the City of Sunny Isles Beach Building Department. (fee is per trade) 3. LOST, REVISED AND REWORKED PLAN FEES A-005 (Res.) A-006 (Comm.) A';005.a A-Ob~.a A-007 (Res.) A-007.a A-ob7.b . (a) LOST PLANS: When a field copy (job copy) is lost, a recertification fee shall be paid to the Building Department (before the office copy is sent out for duplication). The recertification fee shall cover the following services from the Building Department: review and approval by all applicable trades, and stamp indicating the Building Official's certification, Such fee shall be based on thirty percent (30%) of the original building Dermit fee. la. Minimum Fee for Group I (Single Family Residence) lb. Minimum Fee for all others (b) REVISED PLANS PROCESSING FEE: 30% $ 50.00 $ 90.00 l(b) Major plan revision after permit is issued shall be subjected to a fee of fifty percent (50%) 500/0 of the original Dermit fee. 2(b) Minor plan revision shall(be subject to a rn!P!mom$~O;OOfee;ahCl$50.00 per V2 hour or $ 50.00 fraction tnereof for each submittal. 3(c) Minimum Fee for minor plan review $ 50.00 (a) OTHER PLANS PROCESSING FEE: a fcc ma'{ BC im138SCa fer failuFC te mal<<: tRC FC€luirca carrectioflS pr-c"iol:Jsly ifldic:Jted if} 21 pr-c',ious plan r-cvie'..: at a fate f)cr 1/2 hour af Building Department Fee Schedule - rev. 11/6 Page 2 of 34 Building Department Fee Schedule A-007.d (Res.! Comm.) (d) LOST PERMIT CARD FEE: A fee shall be charged for replacing a lost permit card. $ 50;00 $35,00 A-008 (e) g,QV records of inspection results iA excess of 5 pages, there will be a minimum fee per page. $1.00 4. REFUNDS, TIME LIMITATIONS, AND CANCELLATIONS A-009 The fees charged pursuant to this schedule, provided the same are for a permit required by Section 104.1.1 of the Florida Building Code, may be refunded by the Building Official with the following exceptions: (a) No refunds shall be made on requests involving: (1) permits fees of $100.00 or less; or (2) permits revoked by the City Manager or the Building Official under authority granted by the Florida Building Code, or permits cancelled by Court Order, or conditional permits; or (3) permits which have expired; or (4) permits under which work has commenced as evidenced by recorded inspection having been made by the Building Department; or (5) no refunds shall be made on a permit when a change of contractor is requested. (b) A full refund less $100.00 or 50% of the permit fee, whichever is greater, rounded to the nearest dollar, shall be granted to a permit holder who requests a refund proVided that: (1) The Building Department receives an original and hardcopy written request from the permit holder prior to the permit expiration date; Building Department Fee Schedule - rev. 11/6 Page 3 of 34 Building Department Fee Schedule (2) The permit holder submits with such request [as noted in item no. A-009(b)(1)] the Applicant's validated copy of such permit; and (3) That no work has commenced under such permit as supported by any recorded inspection and/or field inspection. A;.OO~.a (c) Applications having a change of contractor or qualifier shall pay a fee of $85.00 to cover the cost of transferring the data from the original $85.00 permit to the second permit. When an original permit has expired under section .w4:5 '~05.4 of Florida Building Code the original permit fee shall be paid. A-009.b (d) A fee of $100.00 shall be paid by the permit holder who submits a written request for a $100.00 permit extension as authorized under the Florida Building Code Section 304.3(b). (e) Where a permit has become null and void pursuant to section 104.5.1 Florida Building S?8e(a credit of fifty percent (50%) of the 9tlglhij! permit fee shall be applied to any re- application fee for permit covering the same project and involving the same plans, provided that the complete re-application is made within six (6) months of the expiration date of the original permit, and proVided that no refund had been made as provided in this Section. (f) Permit applications filed under Ordinance 97-107. A-Ol0 Impact fees are assessed on certain building permits, including re-application on expired permits. (Chapter 174 of the Sunny Isles Beach Charter and Code) A-011 Other agencies including, but not limited to, the Department of Environmental Resources Management (DERM), Miami-Dade Fire Rescue Building Department Fee Schedule - rev. 11/6 Page 4 of 34 Building Department Fee Schedule Department, Building Code Compliance Office and the Florida Department of Health may assess fees on building permits, including re-application on expired permits (contact the applicable agencies for details). 5. SPECIAL PROJECTS: ~~012 A-012.. A-012.b A fee equal to actual staff time and related costs shall be assessed for special projects requiring research by the Building Department in order to answer questions proposed by developers, attorney's, realtors, or municipalities, and others, in connection with the use, re-subdivision, and development of properties, or determination if any violations exist on the property through a review of departmental records. Such special fee will only be levied for requests outside the scope of normal departmental work. A fee equal to $2.00 per page shall be assessed for pre-programmed computer reports on Building $2.00 Department records. The minimum fee shall be $50.00. $$0.00 6. GENERAL INFORMATION: A-at3 X 991 $0.01 A;;013.a (a)A fee charged per square foot will be added to building permits for the State of Florida to study building code requirements for radon gas, and certification and regulation of building code administrators, plans examiners and inspectors. (b)A six peFCeAt (6%) fee elf ti'le teltal permit fee will l3e acJde€l te erigiAal fecs ....i'leFC a COAcl:lrrcAcy review was performecJ. 1\~601o:Re~f:l'OQ,r Qf total job vall1e'WIIIJie'aCloeclito'the'permltifee'aas mandated bythe:MlamfDade'Cooe'ComPllanceOfflce. 7. COST OF PUBLICATIONS AND RECORDS 6% X 992 Aoi014 (a) FLORIDA BUILDING CODE, OTHER CODE BOOKS, SUPPLEMENTS AND DEPARTMENTAL $5.00 Building Department Fee Schedule - rev. 11/6 Page 5 of 34 Building Department Fee Schedule PUBLICATION FEES The charge for each copy of the Florida Building Code, other code books or supplements thereto or other departmental publications shall be assessed by the Building Department in the amount equal to the low bid printing cost plus the demonstrable cost to the Building Department of selling and distributing such code books, code supplements or departmental publications. The charge for publications of Construction Lien Law information is limited to $5.00 per copy of publication as permitted under Chapter 713 of the Florida Statutes. (b) COPIES OF DEPARTMENTAL RECORDS A~Q1'5 X 993 Plan reproduction from microfilm - per sheet $5.00 A~oi'6 X 99~ Reproduction records - per page $0.15 A.017 X-005 Double sided copies - per page $0.20 A~OJ8 X 996 A~01f:J X 997 Certified copies - per page $1.00 Notary public service - per document $1.00 A~Q20 X 998 A~O.2i X 999 A~Q2t;a Aoi021;b Research and ordering plans $5.00 Request for Building Permits Copies or Information (a) Response to request within 24 hours of receipt (b) Response to request within 7 working days or more $ 50.00 $ 25.00 8. INSPECTIONS REQUIRING OVERTIME: Building Department Fee Schedule. rev. 11/6 Page 6 of 34 Building Department Fee Schedule A~,022 A 912 Charges for construction inspection, which are $ 75.00 requested in advance and which require that employee work overtime will be at a rate per hour in advance minimum of 2 hours. 9. FEES BASED ON ESTIMATED COST- DOCUMENTATION REQUIREMENTS The Building Department may require the permit applicant to submit appropriate documentation as proof of estimated cost of construction used to compute permit fee. A-023 10. TRAINING AND EDUCATION FEES: 2% All permits for new construction alterations or additions shall be accompanied by payment of training and educational fee of two Dercent (2% 1 of the permit fee cost. All fees collected pursuant hereto shall be set aside to offset the cost of training and education of personnel in the regulation, inspection and enforcement of the Florida Building Code. A~024 11. TECHNOLOGY FEES 5% All permits for new construction, alteration or additions shall be accompanied by payment of a technoloav fee of 5.0%. All fees collected pursuant hereto shall be set aside to offset the cost of computer system purchases or technology expenditures within the building department. 12. PRE - SUMITAL REVIEW FEES: A..O:tS A per hour fee will be assessed for Building, Electrical Mechanical, Plumbing and Zoning review when the customer elects to submit plans for pre - submittal review. A per hour fee will be assessed for Structural and $ 52.00 Building Department Fee Schedule - rev. 11/6 Page 7 of 34 Building Department Fee Schedule Landscaping pre - submittal review. Refer to Professional Fee Ordinance. A~026 $ 115.00 13. STRUCTURAL ENGINEER PLAN REVIEW: A per hour fee will be charged for plan review for all new construction and alteration/repair that involves structural review. A~O~7 14. LANDSCAPE ARCHITECTURAL REVIEW: A regular per hour fee will be charged for landscaping review. $13'.00 $11&.00 B. BUILDING PERMIT FEES Fees listed in Subsection (B) include only building permit fees and do not include fees for Plumbing, Electrical and Mechanical, which are listed in the following sections: 1. UP - FRONT PROCESSING FEE B-OOl When the building permit application is received for the construction of a new Single Family Residence or Duplex, the applicant shall pay an up - front fee for each square foot or fractional part thereof, or B-002 A per dollar in estimated value or fractional part when square footage does not apply. B-003 When a building permit application is received for a commercial project, the applicant shall pay an up- front processing fee per 100 square feet or fractional part, or A fee per each $100.00 of estimated value or fractional part thereof. All this processing fees are not refundable, but shall be credited toward the final building permit fee. 2a. MINIMUM FEE FOR BUILDING PERMIT $0.15 $0.02 $0.75 B-004 The minimum fee for all building permits is applicable $ 100.00 to all items in this section except as specified. Building Department Fee Schedule - rev. 11/6 Page 8 of34 Building Department Fee Schedule 2a. ONE - ITEM LOW COST PERMIT FEE B-005 A permit fee for a one - item permit with a cost of $ 35.00 $1,000 or less B 006 3. NEW BUILDING OR ADDITIONS 8;'006 B 007 /\flC'.v ceAstn:lctiaA af a SiAglc Fafflil'( or Dl:Jple)( Above 9r35 1000 sq. ft. (Creu(3 R) (3er sq. ft. Prefabricated utility shed (Max 100 sq. ft. of floor $ 75.00 area). 3a. SINGLE FAMILY AND DUPLEX (GROUP R) ATTACHED I DETACHED STRUCTURES B-007 B 008 B~008 B 009 o to 100 sq. ft. in floor area $ 100.00 101 to 300 sq. ft. in floor area. $ 135.00 B..009 BOlO 301 to 500 sq.ft.in floor area. $ 160.00 B-Ol0 B011 501 to 1000 sq. ft. in floor area. $ 250.00 I~Ot1 B012 Above 1000 sq. ft. per sq. ft. $ 0.35 311. SINClE F.\,lIl.V AND DUPlEX QR9UP R ATF~~';~(';!!R~;!!~r;n~~~~!io . 3b. ~14 JIM~I"Q~~ ,NRn) .Jt,.~ .R$"~I:;R, SINGLE FAMILY AND DUPLEX (GROUP R) 8;'012 B013 B-Ot2.a B-012;b Alterations or repairs to Single Family Residence or $ 0.08 Duplex (Group I R) per $ 1.00 of estimated cost or fractional part. Minimum Fee $ 175.00 Repairs due to fire damage per $1.00 of estimated cost $ 0.09 or fractional part (copy of construction contract required) Building Department Fee Schedule - rev. 11/6 Page 9 of 34 Building Department Fee Schedule 8;i012.ci Minimum Fee $ 275.00 8-0'13 Painting: Residential Painting permit $ 35.00 4. NEW CONSTRUCTION COMMERCIAL I MULTI - FAMILY RESIDENTIAL B~014 101S All structures per 100 sq. ft. or fractional part of floor $ 21.00 area. B~o15 1018 5. NEW CONSTRUCTION OTHER THAN AS SPECIFIED HEREIN Bulk storage - tank foundations, unusual limited - use buildings, marquees, and similar construction. For each $1000.00 of estimated cost or fractional part $ 9.50 B-01'6 1017 For structures of unusual size or nature such as arena, stadiums and water sewer plants the fee shall be based on V2 of 1 % of the estimated construction cost. .05% B~Ol 1019 B~017 ,ai 6. ALTERATIONS AND REPAIRS TO BUILDINGS AND OTHER STRUCTURES EXCEPT GROUP R For each $100.00 of estimated cost or fractional part. $ 2.50 $:1,7$;00 $100,00 Minimum Fee 8;;018 IOU; B;;03:8.a B-018.b Painting Commercial I Multi- family: For the first $ 1,000.00 of estimated cost $100.00 $10.00 $100.00 For each additional $ 1,000.00 of estimated cost Minimum fee 7. MOVING BUILDINGS OR OTHER STRUCTURES Building Department Fee Schedule - rev. 11/6 Page 10 of 34 B-019 B 929 B.019;a 8~019.b Building Department Fee Schedule For each 100 sq. ft. or fractional part thereof (does not include cost of new foundation or repairs to building. SLABS: MIOImWn $~;60\pef7$tQO;OOlpne$tlmateCl;j6f:)value 8. ROOFING (INCLUDING RE - ROOFING) GROUP R OCCUPANCY $ 15.00 $199.99 !Jl()();()O !J2;$() B~020 B 921 Roofing shingle and other roof types not listed per sq. ft. of roof coverage including overhangs. $0.10 B-021 B 922 Roofing tile $0.12 B-022 B 923 Minimum fee for roofing $100.00 9a. ALL OTHER OCCUPANCIES B-023 B 92i B"02S;a B.;02S;b Roofing of all types up to 30,000 sq. ft. $0.12 $0.10 $0.08 Per sq. ft. from 30,000 to 60,000 sq. ft. Each sq. ft. thereafter 10. FENCES AND I OR WALLS P~024 B 926 B~024.a B 927 B';024.b B 928 B~024;C B 929 Chain Link o - 500 Linear ft. $ 100.00 $ 140.00 $0.10 501 - 1000 Linear ft. Each Additional linear ft. over 1000 Wood each linear feet $0.65 B.024.d B 939 Concrete each linear feet $1.25 11. SWIMMING POOLS, SPAS, AND HOT TUBS Building Department Fee Schedule - rev. 11/6 Page 11 of 34 B~O~5 B931 B~02S.a 8-025;b Building Department Fee Schedule 20,000 gallons and under $ 230.00 Each additional 1,000 gallons or fraction area $4.50 Pool decks per $100 dollars of estimated job value $2.50 B~026 B932 8~026;a B 933 12. TEMPORARY PLATFORMS AND TEMPORARY BLEACHERS TO BE USED FOR PUBLIC ASSEMBLY For each 100 sq. ft. or fractional part of platform area $5.25 For each 100 linear feet or fractional part of seats $4.50 13. DEMOLITION OF BUILDINGS B-027 B 93~ B-027.a 500 sq. ft. and under O'o'er 500 SEt. ft. ~achaClaltI9nall000~qUar~ fe~t or fraction thereof $100.00 $50.00 $19.99 13a. DEMOLITION (PARTIAL) B-028 B 93& B-028.a 500 sq. ft. and under Over 500 SEt. ft. I!ac;h additional 1000 square ~feet or fraction thereof $100.00 $5Q,OO $19.99 13b. DEMOLITION (INTERIOR) B~029 B 93& 8~029.a 500 sq. ft. and under Each Additional 1000 sq. ft. or fraction thereof $ 100.00 $ 10.00 14. SHOP DRAWING REVIEW (FOR OTHER THAN GROUP R) B:'030 $ 100.00 Minimum Fee B-031 B 937 B-031;a 14(a) Trusses/Steel Structures/Shoring First 600 sq. ft. or fractional part Each additional 100 sq. ft. or fractional part Building Department Fee Schedule - rev. 11/6 $12.15 $1.25 Page 12 of 34 Building Department Fee Schedule B...032 8938 B~033 8939 ..;;034 8 9~9 B~Q35 89U 8"0 '6 ~ 3. 8 9~:l 14(b} Pre-cast! Pre-stress $ 8.00 (Roof - Floor - Walls) each 1,000 sq. ft. or fractional part 14(c} Overhead Doors each $ 8.00 14( d} Skylights Each $ 8.00 14(e} Hand Rails/Stair Rails per linear feet $1.25 14(f} Storefront / Fixed Glazing (Under 8 ft. high by $8.75 4 ft. wide) each 100 sq. ft. or part (when no separate permit is required) B-037 8 9~3 14(g} Walk - in - Coolers each $ 100.00 15. INSTALLATION I REPLACEMENT OF VVINDOVVS, AN9 DOORS,ltAllalNCJS;O.ANb SAFSGOARDS B,;038 8944 B-038.a B-039 B~040 B-041 89U B"042 Window installation, alteration or repair - per sq. ft. of window or door area (except new construction for Group R) $9,97 $&r24 $Q.25 Minimum Fee Impact wlnqowsor glass 'doors Repla<:ElmElht of. broken Qlass. for windows and doors per$100.0Mollars QfjQb value Curtain Walls, Storefront, windows and doors For each 100 sq. ft. or fractional part (except for New Construction under 3 stories Railings and Safeguards per $10Q;Q0 of job value $100.00 $9,31 $0.30 $2.50 $8.75 $2.50 16. SCREEN ENCLOSURES, CANOPIES & AWNINGS 8~043 89U B-044 16(a) Screen enclosures: each 100 sq. ft. or fraction $12.00 16(b} Free standing canopies: for each $1,000 of $12.00 Building Department Fee Schedule - rev. 11/6 Page 13 of 34 IOU B~044.a B~045 1048 B~045.a B~046 1019 8;;04'6.8 B~046;ti B-047 1050 Building Department Fee Schedule estimated cost or fractional part Minimum Fee 16(c) AWNINGS AND CANOPIES: HORIZONTAL projection per sq. ft. area covered Minimum Fee Panels 16(d) Storm Shutters - per sq. ft. area covered $100.00 $().\35 $0.15 $100.00 $0.20 $0.21 $0:25 $ 100.00 $ 100.00 16(e) Storm Shutters (Roll down, accordion included) Minimum Fee 17. TIE DOWN Tie Down Inspection fee: This does not include installation of meter mounts and service equipment. Separate mechanical, plumbing and related electrical permits are required. B-048 1058 18. TIE DOWNS RE-INSPECTION FEE $ 65.00 B~049 1057 19. ADDITIONAL INSPECTIONS $ 65.00 20. SIGN PERMIT FEES B-050 1052 B..050;a IOU B~O,50.ti 1051 20(a) Minimum sign fee $100.00 20(b) Signs - AeA iIIuffiiAatcd (per sq. ft.) $1.25 20(c) Annual Renewal of Class C signs on or before $30.00 October 1st of each year (per sign) B-OSl 1055 21. SATELLITE DISH (above 1 meter) $150.00 1056 B-OS2 B~052.a All trade each 22. ORNAMENTAL IRON I SECURITY BARS) Per sq. ft. of coverage Minimum Fee $0.10 $0.50 $ 100.00 Building Department Fee Schedule - rev. 11/6 Page 14 of 34 Building Department Fee Schedule 1959 B-053 B:<05~:a 23. DOCKS 20 Lineal Feet and under Each additional foot or fraction thereof $100.00 $5.00 19&9 t5~054 B~054;a B-054.b 8-054.c 24. FUEL lOlL TANKS 1,000 gallons and under Each additional 1,000 gallons or fraction thereof All wholesale storage tanks based on cubic contents at commercial building rates Removal of tanks (1 st tank) Each additional tank $ 100.00 $ 11.50 $25.99 $60.00 $ 100.00 19&1 B-055 B-055.a B~055;b B-055.c B~05.5.d B~055.e 25. PAVING I RESURFACING (commercial and residential (asphalt including painting and stripping) 500 sq. feet and under Each additional 1,000 sq. ft. or fraction thereof up to 2,500 sq. ft. Each additional 1,000 sq. ft. or fraction thereof over 2,500 sq. ft. ReSURFACING Maxl,mum for resurfacing PefSquare 'foot of coverage Minimum $ 100.00 $ 30.00 $1.99 $2.00 $1&5.79 $/~90.00 $0.06 $100.00 19&2 B;;05(i B-056.a 19U B~051 B-057.a B:<058 I 9&~ 26. PILING Dolphin pile, each Minimum Fee 27. SEAWALL I RETAINING WALLS 50 Feet and under Over 50 feet, per foot 28. TENTS (Temporary, carnivals, etc.) 3.0, ~aX,maximum 29i'fLOORING $ 30.00 $ 100.00 $ 110.00 $1.50 $ 60.00 Building Department Fee Schedule - rev. 11/6 Page 15 of 34 B-05P 8~059.a B 96& 8~06'O 8..06'Oil B~.060iti B~060;Cl B~06'O.(I 8.'060.e $;;;'060;' Building Department Fee Schedule AJIW99t1h~fijer,~qij~r~>fti MftJ"I"o"'.m.';lf'! ".",mI,tJI~ 29. LANDSCAPING When application for a landscaping and tree removal permit is approved and before a permit is issued, a fee therefore shall be paid based on the following schedule of rates. Other fees, as referenced throughout this division, are also applicable before, during and after permit issuance. a) Minimum Fee b) General landscaping, per sq. ft. of required landscaping c) Residences (new) Single - family Duplex d) Landscaping for code compliance e) Tree removal, per tree $0.12 $100.0'0 $100.00 $9,917& $'Oto~ $100.00 $9,917& $'0,;'02 $100.00 $138.67 $t3P,'O'O $16.12 16;00 C PLUMBING PERMIT FEES Fees listed in Subsection (C) include only plumbing permit fees and do not include fees for Building, Electrical and Mechanical, which are listed in the following sections: P-OO 1 1. MINIMUM PLUMBING OR GAS FEE PER PERMIT Except as otherwise specified this minimum does not $ 100.00 apply to supplemental plumbing permits issued as supplementary to current outstanding permits for the same job) la. ONE - ITEM LOW COST PERMIT FEE P-002 A permit fee for a one - item permit with a cost value $ 35.00 of $1000 or less. 2. RESIDENTIAL PLUMBING (GROUP R) Building Department Fee Schedule - rev. 11/6 Page 16 of 34 P-003 P-004 P~004.a P-005 P-OtJS.a Building Department Fee Schedule New Single family Residence or Duplex (Group R) per sq. ft. Addition to Single Family Residence or Duplex (Group R) per sq. ft. $ 0.12 $ 0.12 Minimum Fee Alterations or repairs to Single Family Residence or Duplex (Group R) per $1.00 of estimated cost or fractional part Minimum Fee $ 100.00 $ 0.05 $ 100.00 3. COMMERCIAL (ALL GROUPS EXCEPT GROUP R) ROUGHING-IN OR PLUGGED OUTLETS FOR BATHTUBS, CLOSETS, DOCTORS, DENTISTS, HOSPITAL STERILIZERS, AUTOCLAVES, AUTOPSY TABLES AND OTHER FIXTURES, APPURTENANCES OR OTHER APPLIANCES HAVING WATER SUPPLY OR WASTE OUTLET, OR BOTH, DRINKING FOUNTAINS, FIXTURES DISCHARGING INTO TRAPS OR SAFE WASTE PIPES, FLOOR DRAINS, LAUNDRY TUBS, LAVATORIES, SHOWERS, SINKS, SLOP SINKS, URINALS, AND WATER HEATERS P-006 For each roughing - in or plugged outlet $ 8.00 P-007 P;'007.a Fixtures set on new roughing - in or plugged outlets or $ 8.00 replaced on old roughing - in, each fixture Minimum Fee $ 100.00 P-008 4. SEPTIC TANKS, SETTLING TANKS, GAS AND $ 75.00 OIL INTERCEPTORS, AND GREASE TRAPS Including tank abandonment, drain tile and relay for same) P-009 P-Ol0 5. SEWER Each building storm sewer and each building sewer $ 100.00 connection is made to a septic tank, or a collector line or to an existing sewer or to a city sewer or soakage pit or to a building drain outside a building Sewer Capping / Demolition $ 60.00 6. CONDENSATION DRAIN Building Department fee Schedule - rev. 11/6 Page 17 of 34 Building Department Fee Schedule (AIR CONDITIONING) P-Oll Per outlet $ 4.15 Except single not manifold A/C outlet not exceeding 5 tons N IC P-012 7. WATER PIPING Water service connection to a municipal or private $ 8.00 water supply system (for each meter on each lot) Minimum Fee $ 100.00 $ 6.00 P-013 P~013,a Water connection or outlets for appliance or installations not covered by fixture set above Minimum Fee $ 100.00 $1&.89 $11,00 $ 100.00 $ 90.00 P-014 P"014,a Irrigation system and underground sprinkler system for each zone Minimum Fee P-015 P~015,a Solar water heater installation, equipment replacement or repair. Swimming pool piping, not including well (new installation) Minimum Fee $ 100.00 $ 75.00 $ 100.00 P-016 Residential P-017 Commercial P-018 Sump pump $ 8.00 $ 50.00 $ 60.00 $ 50.00 $ 75.00 $ 7.00 P-019 Swimming pool heater each P-020 Swimming pool maintenance each 2" or less water service backflow assembly P-021 2 112" or larger water service backflow assembly P-022 P-023 Repairs to water piping Building Department Fee Schedule - rev. 11/6 Page 18 of 34 Building Department Fee Schedule For each $1,000 estimated cost or fractional part 8. WELLS P-024 P-025 Residential wells per well Commercial wells per well $ 15.00 $ 100.0 9. NATURAL GAS OR A L1QUIFIED PETROLEUM P-026 For each outlet Group R (includes meters and $ 8.00 regulators) For each appliance (does not include warm air heating $ 8.00 units, but does include un-vented space heaters and vented wall heaters no duct works) P-021 Other Groups P-028 For each outlet (includes meters and regulators) $ 15.00 P-029 For each meter (new or replacement) $ 8.00 P-030 For major repairs to gas pipe where no fixtures or $ 50.00 appliance installation is involved P-031 Underground L.P. gas tanks per group of tanks at a $ 15.00 single location P-032 Above ground L.P. gas tanks per group of tanks at a $ 100.00 single location 10. WATER TREATMENT PLANTS, PUMPING STATIONS, SEWER TREATMENTS AND LIFT STATIONS P-033 Water treatment plant (interior plant piping) $ 250.00 P-034 Sewage treatment plan (interior plant piping) $ 200.00 P-035 Lift station (interior station piping) $ 300.00 P-036 Sewage ejector $ 100.00 Building Department Fee Schedule - rev. 11/6 Page 19 of 34 P-037 Building Department Fee Schedule 11. WATER TREATMENT PLANTS, PUMPING STATIONS, SEWER TREATMENTS AND LIFT STATIONS On private property and other than public utility $ 15.00 easements. Each 50 ft. or part thereof Minimum Fee $ 100.00 12. STORM I SANITARY UTILITY I COLLECTOR LINES FOR BUILDING DRAIN LINES (on private property other than public utility easements) P-038 Each 50 feet or part thereof $15.00 $ 30.00 $ 100.00 P-039 Each manhole or catch basin p.039.a Minimum Fee 13. TEMPORARY TOILETS - WATERBORNE OR CHEMICAL P-040 First temporary toilet $ 100.00 P-041 For each additional (Renewal of temporary toilet - $ 15.00 same charge as original permit) P-042 14. DENTAL VACUUM LINES each system $ 75.00 P-043 15. MOBILE HOME CONNECTIONS each unit $ 75.00 P-044 16. ADDITIONAL INSPECTIONS $ 65.00 D. ELECTRICAL PERMIT FEES Fees listed in Subsection (D) include only Electrical permit fees and do not include fees for Building, Plumbing and Mechanical, which are listed in the following sections: EL-OOl 1. MINIMUM ELECTRICAL PERMIT FEE $ 100.00 INCLUDING REPAIR WORK PER PERMIT. Building Department Fee Schedule - rev. 11/6 Page 20 of 34 Building Department Fee Schedule Except as otherwise specified this minimum does not apply to supplemental Electrical permits issued as supplementary to current outstanding permits for the same job and demolition work). EL':b'b'1.a 2;5% la. ONE - ITEM LOW COST PERMIT FEE EL-002 A permit fee for a one - item permits with a cost of $ 35.00 $1000 or less. EL-003 2. RESIDENTIAL I COMMERCIAL (CONDO, NEW CONSTRUCTION) All electrical within unit per square feet, except all $9.12 common areas. $0.15 EL-004 3. RESIDENTIAL: (Remodeling, condo, house, new $0.12 house) per square feet, not including service or special $CM9 systems. EL-005 4. AC: HEAT $26.50 5. AC: COOL Maximum Fee $9.00 $3.70 $ 2.25 $ 175.00 EL-006 EL':006;a EL~006.b l!L':006ic First Ton Two Tons to Ten Tons (per ton) Ten Tons or Greater (per ton) 6. MOTORS: PER HORSE POWER EL-007 One horse power or less l!"~001.a Two horse power to ten horse power (per Horse Power) E"'~b'b1.b Ten horse power or more (per Horse Power) $9.00 $3.70 $ 2.25 Building Department Fee Schedule - rev. 11/6 Page 21 of 34 Building Department Fee Schedule El.i4007ie Maximum Fee 7. GENERATOR I TRANSFORMER $ 175.00 EL-008 5 KVA or less El.i40()$/a Each additional KVA EL~()O$itJ Maximum Amount $17.50 $ 3.30 $ 175.00 EL-009 8. PANEL (Remote, control, disconnect, $ 17.50 contractor, etc.) EL-Ol0 EL~()lOia EL';010~tJ 9. PANEL AND SWITCHBOARD 200 Amps or Less 200 Amps to 800 Amps 800 Amps or Greater (Each Additional Amp) $ 25.00 $ 35.00 $4.00 EL-011 10. BASIC OUTLET (Rec., lV, Telephone, Etc.) Per outlet $1.75 11. SPECIAL OUTLET (GFI, Appliance, etc.) $3.50 $9.00 $2.50 EL-012 Residential per each El.i~()12:. Commercial per each EL-013 12. FIXTURE: Fixture, fixtures, etc. each EL-014 13. PLUG MOLD: plug, wire way light track, etc. Per linear feet $1.00 14. LIGHT POLE EL-015 EL~O:lS;a EL":015;b EL..:015.( Residential Commercial Per Head / Commercial Per Head / Residential $ 12.00 $ 17.00 $ 6.00 $ 2.50 EL-016 15. BUSS DUCT I DUCT BANK (per linear feet) $ 1.80 Building Department Fee Schedule - rev. 11/6 Page 22 of 34 EL-017 EL"017;a EL';017;l) EL~017.c EL-017;ct Building Department Fee Schedule 16. SERVICES: (new work, condo, plus equipment) $ 9.00 per 100 amps Temporary for Construction Service Change $ 100.00 1; TempohrJQr::tesf30'days'9!lIy.'R{ioew' evejy 30 $ 100.00 .' ' , days for'~mmonareabltllaihg sY$t~ins; 2.;Apafffi'\en~m~ter$i{one'tlmefeepeFmeter bank, $ 1()0;00 " " ,notcpefmefer, Temporary for elevator (minimum fee) per elevator $ 100.00 EL-018 EL-019 EL"Ol9ia EL.;019.b 17. CONSTRUCTION TRAILER (Min. Fee) $ 130.00 18. FIRE ALARM System Panel Devices $ 150.00 $ 25.00 $2.50 EL-020 EL~020;a EL';020,b El;020iC: EL,;020id EL-020.El EL;';O,2o.f 19. BURGLAR ALARM Pre Wire / System Panel Devices $ 60.00 $ 25.00 $2.50 $1.75 $ 12.50 $ 12.50 $ 120.00 Contacts Card Reader Camera Access System 20. TELEVISION / TELEPHONE EL-021 Minimum Fee (Per System) El402:t;~ Per Jack $ 35.00 $1.75 21. INTERCOM SYSTEM Building Department Fee Schedule - rev. 11/6 Page 23 of 34 Building Department Fee Schedule EL-022 E(;\'b~a.a EL~CJ'22ib Residence Commercial Speaker $ 60.00 $ 90.00 $ 2.50 22. DATA SYSTEM (COMMERCIAL ONLY) EL-023 Fee per system .1.\~oJ~~~ Per Device $ 175.00 $1.75 EL-024 EL-024.a 23. VACUUM SYSTEM Fee per system Per outlet $ 45.00 $1.75 EL-025 EL~02S;a 24. SIGN Minimum Fee Per sq. ft. $ 100.00 $1.50 25. TEMPORARY: (CARNIVAL, FAIR, TREE LOTS, FIREWORKS STAND, ETC.) EL-026 Minimum Fee Et..~02C);a Per ride or structure $ 200.00 $ 50.00 EL-027 EL;027.a EL';027.b EL-027.C: EL~b27;d EL~027.e EL.,027.f 26. SWIMMING POOL Residential pool or spa Residential pool and spa Commercial and Multiple family Pool or spa Pool and spa Repairs Commercial Repairs Residential PQ'oVfleater.s $ 107.00 $ 167.00 $ 150.00 $ 203.00 $ 140.00 $ 60.00 $2$;50 Building Department Fee Schedule - rev. 11/6 Page 24 of 34 EL-028 Building Department Fee Schedule 27. BONDING: (FOOTER, SCREEN ROOM, ETC.) 28. SOUND SYSTEM $ 25.00 EI:~0'2fJ.c SpeaKers 29. SMART HOUSE I LIGHT TOUCH SYSTEM $ 45.00 $ 2.50 $ 4.50 $2.50 EL-029 Per system 81.,~029ia Volume Control 81.,....029;6 Master Control EL-030 EL"030.a EL-030.b Per System Per Panel Per Device $ 45.00 $ 25.00 $ 2.50 30. DEMOLITION EL-031 500 sq. ft. or Less EL-031.a 500 sq. ft. or more (per thousand sq. ft.) $ 100.00 $ 10.00 D. MECHANICAL PERMIT FEES Fees listed in Subsection (D) include only mechanical permit fees and do not include fees for Building, Electrical and Plumbing, which are listed in the following sections: 1. MINIMUM MECHANICAL PERMIT FEE $ 100.00 INCLUDING REPAIR WORK PER PERMIT Except as otherwise specified this minimum does not apply to add-on mechanical permits issued as supplementary to current outstanding permits for the same job.) la. ONE - ITEM LOW COST PERMIT FEE MC-OOl A permit fee for a one-item permit with a cost of $ 35.00 Building Department Fee Schedule - rev. 11/6 Page 25 of 34 Building Department Fee Schedule $1000 or less. 2. MECHANICAL SINGLE FAMILY RESIDENCES AND DUPLEXES (GROUP R) INCLUDES CATEGORIES 03, 10 AND 41 MC-002 O"002.a MC-003 MC:'003.a New construction er s . foot Mlnlrnclm\Fee Additional to Single Family and Duplex (Group I) and Duplex per sq. foot. MifllmclitifFee 0.08 $'100,00 $0.10 $100.00 MC-004 MC"004~a MC-005 3. AIR CONDITIONING AND REFRIGERATION, INCLUDING THE RELOCATION OF EQUIPMENT Separate permits are required for electrical, water and gas connections For each ton capacity or fractional part thereof Minimum .Fee Room AjC wall unit $1&,99 $17.2$ $100.00 $ 37.145 $37.50 4. FURNACE, HEATING EQUIPMENT AND POOL HEATERS INCLUDING COMMERCIAL DRYERS, OVENS AND OTHER FIRED OBJECTS NOT ELSEWHERE CLASSIFIED For vented and un-vented wall heaters, see item C (check above) MC-006 For each KW Mt.....OOI);a Minimum Fee $1.29 $8.44 $3.45 $199,99 $ 60:00 5. FIRE SPRINKLER SYSTEM MC-007 MC-008 Filling Fee Minimum Fee (from 0 to 25 heads) Maximum Fee when 25 heads or more per system $100.00 $300.00 Building Department Fee Schedule - rev. 11/6 Page 26 of 34 Building Department Fee Schedule MC-009 Each 50 ft. of underground piping or part thereof MC~Q09ia Minimum Fee $ 21.40 $ 100.00 6. STORAGE TANKS FOR FLAMMABLE LIQUIDS MC-Ol0 Per Tank $ 160.00 7. INTERNAL COMBUSTION ENGINES MC-011 MC-011.a Stationary - each Minimum Fee 8. COMMERCIAL KITCHEN HOODS $ 100.00 $ 100.00 MC-012 Each $ 150.00 9. OTHER FEES MC-013 Fire chemical halon and spray booths for each per system Insulation, trash chute tube, conveyor systems, pressure and process piping, sheet metal or fiberglass air conditioning ducts, cooling towers, mechanical ventilation for each $1,000 or fractional part of contract cost. MC-014 MC~()1";a Minimum Fee MC-015 Ductless fan each MC-016 10. ADDITIONAL INSPECTIONS $120.00 ~11~.3& . 12.93 $12.00 $11.2& $ 100.00 $ 33.17 $33;00 $ 65.00 11. ELEVATORS, ESCALATORS AND OTHER LIFTING APPARATUS Fee for original installation or major alteration and remOdeling (includes initial inspection and certificate) MC-017 New elevator traction - each MC-018 New elevator hydraulic - each Building Department Fee Schedule - rev, 11/6 $ 600.00 $ 450.00 Page 27 of 34 Building Department Fee Schedule MC-019 Freight elevator - each $ 600.00 $ 360.00 $ 240.00 $ 150.00 $ 180.00 $ 300.00 MC-020 MC-021 MC-022 MC-023 MC-024 Residential elevator - each Escalator Dumbwaiters - each Wheelchair Lift - each Man lift - each MC-025 Conveyors and all other lifting and transporting $ 100.00 apparatus (except as otherwise provided) - each drive MC-026 Major alterations and remodeling for an elevator, first $ 100.00 two landings. $ 10.00 $ 150.00 $ 180.00 $ 150.00 $ 50.00 MC-026.a Each landings thereafter - per floor MC-027 Refinishing cab interior ( no electrical work) MC-028 Vertical conveyor MC-029 Elevator for construction use only, 30 day limit MC-030 Key box each 12. FEES FOR PERIODIC RE-INSPECTIONS MC-031 Passenger elevator (annual inspection per Code) $ 150.00 MC-032 Freight elevators (annual inspection per Code) $ 150.00 Escalators $ 75.00 MC-033 MC-034 Dumbwaiters, wheelchair lifts and all other lifting and $ 75.00 transporting apparatus vertical conveyors (annual inspection per Code) 13. AMUSEMENT RIDES AND DEVICES Building Department Fee Schedule - rev. 11/6 Page 28 of 34 Building Department Fee Schedule MC-035 Per ride $ 95.00 $ 75.00 MC-036 For each permanent unit installed or altered MC-037 Annual inspection for each ride or device at anyone $ 75.00 location (permanent installation only) 14. BOILERS AND PRESSURE VESSELS Installation permits fees (including initial inspections and certificate). Does not include installation or connection of fuel and water lines. The following fees apply to each boiler to be installed MC-038 Boilers less than 837 MBTU - each $ 8&.87 $86;00 $ 193.9& $10:3.00 MC-039 Boilers 837 MBTU to 6,695 MBTU - each MC-040 Boilers 6,695 MBTU and up - each $ 113.12 $t43;00 $ &8.79 $CSgiOO $ &8.79 $CS9iOO MC-041 Steam driven prime movers - each MC-042 Steam actuated machinery - each MC-043 Unfired pressure vessels (operating at pressures in excess of 60 PSI and having volume of more than 5 cu. ft.) each pressure vessel. $ 8&.87 $$6iOO 15. FEES FOR PERIODIC RE-INSPECTIONS MC-044 Steam boilers (annual) - each $ lU.12 $t43iOO $ &9.&~ $CSO.OO MC-045 Hot water boilers (annual) - each Building Department Fee Schedule - rev. 11/6 Page 29 of 34 Building Department Fee Schedule MC-046 Unfired pressure vessels (annual) - each $ 52.&7 $53:00 $ 52.&7 $$$,00 MC-047 Miniature boilers (annual) - each MC-048 Certificate of inspection (where inspected by insurance $ 85.87 company) - each $aG~OO MC-049 Shop inspection of boiler or pressure vessels per $ 85.87 complete vessel. *a6;()() E. 40- YEAR RE-CERTIFICATION FEES For every application for 40 - year re-certification under Section 104.9 pf the Florida Building Code there shall be paid to the Building Department, for the processing of each application, a fee of $359.00 during fiscal year 2004 - 2005 and increase of 0.08% for every subsequent fiscal year and for every application for subsequent re-certification at 10 year intervals thereafter, there shall be paid to the Building Department for the processing of each application, a fee of $359.00 during fiscal year 2004 - 2005 and an increase of 0.08% for every subsequent fiscal year. Recording Fees: as established by the Clerk of the Court (Recorder) F. STRUCTURAL GLAZING SYSTEMS RE- CERTIFICATION FEES For the initial application for structural glazing re- certification and each subsequent application under Section 104.9 and 3515 of the Florida Building Code, there shall be paid to the Building Department of the processing of each application a fee of $359.00 during fiscal year 2004-2005 and increase by 0.08% for every subsequent fiscal year. G. ENFORCEMENT FEES Building Department Fee Schedule - rev. 11/6 Page 30 of34 Building Department Fee Schedule 1. CONTRACTOR ENFORCEMENT G-OOl Case processing fee each $ ~99.72 $400iOO G-002 Field inspection $ lH.~9 $U:4iOO G-003 Re-inspection fee $ 68.79 $C$~;OO $ 2.29 $.2iOO G-004 Photographs - each G-005 Lien Processing Fee $ 57.25 ,lmOO G-006 Lien Settlement fee $ 57.25 $51iOO 2. CRIMINAL PROCESSING RECOVERY COST G-007 Case processing fee $ ~99.72 $400.00 $ 68.79 !$C$9iOO G-008 Inspection - each G-009 Pictures $ 2.29 $2.00 $ 22.99 $29:00 G-Ol0 Corporate Information G-011 Case Processing Fee $ 228.98 $22~.OO $ 68.79 $C$~'OO G-012 Court Appearance - each G-013 Posting of Notices - each $ 31.35 Building Department Fee Schedule - rev. 11/6 Page 31 of34 Building Department Fee Schedule G-014 Lien Recordation / Cancellation of Notices - each $34iOO $ 10.08 $40;00 3. FLORIDA BUILDING CODE - CHAPTER 2 (UNSAFE STRUCTURES) G-015 Case Processing Fee $ 400.72 $(4'00,00 $ 2.29 U;OO G-016 Pictures Each G-017 Inspection Fee $ 125.91 $ 126100 G-018 Re- inspection fee $ 85.87 $8$iOO $19,08 $40l00 $ 113.12 $143.00 G-019 Posting of Notices - each G-020 Unsafe Structures Board Processing Fee G-021 Title Search Actual Cost G-022 Court Reporting Transcription Actual Cost Legal Advertisement Actual Cost G-023 Permit Fees Actual Cost G-024 G-025 Lien Recordation / Cancellation of Notices - each $ 19.98 ,!fOlOO G-026 Bid Processing Fee $ 111.19 $l14l00 G-027 Demolition / Secure Services Actual Cost G-028 Asbestos Sampling and Abatement Actual Cost Building Department Fee Schedule - rev. 11/6 Page 32 of34 Building Department Fee Schedule G-029 Corporate Information $ 22.99 $~3~(J(J F. CERTIFICATE OF USE AND OCCUPANCY FEES 1. TRAILER USE CERTIFICATE F-OOl Mobile homes approved for temporary occupancy $ 180.00 during construction of a residence (Section 33-168, code of Miami Dade County F-002 Mobile homes or modular units approved for $ 368.00 Commercial purposes or Development projects, including watchman's quarters and temporary sales offices. F-003 Construction field office $ 125.00 F-004 The maximum fee for a Certificate of Use and $ 630.00 Occupancy proVided that no violation exists at time of C/O When there is a change of use, business ownership or name the fee shall be the original fee listed for the use proposed No refund shall be made of fees paid for use and occupancy permits. In case of error adjustments may be made by the Building Official/Administrator F-005 In violation (plus double fee) $ 158.00 F-006 Failure to renew C/O, TCO or Temporary Certificate of $ 150.00 Completion (TCC) C/Os, TCOs or TCCs not renewed on or before the renewal or expiration dates will be assessed a violation fee plus a double C/O, TCO or TCC fee. 2. CERTIFICATE OF COMPLETION (C.C.) F-007 Single Family residence, townhouse, mobile home in $ 35.00 mobile park unit and commercial shell per trade. F-008 Duplexes per structure $ 40.00 Building Department Fee Schedule - rev. 11/6 Page 33 of34 , Building Department Fee Schedule F-Ol0 When an inspection is necessary prior to the issuance $ 32.00 of a C/O or TCO or TCC and inspection fee shall be charged for each inspector who is required to make a field inspection. Temporary C/O and CC will be charged a fee equal to the final CO or CC cost in addition to the inspection fee. This fee will be required regardless of the length of time the Temporary CO or CC is needed up to ninety (90) days for Certificates of Use and Occupancy and up to sixty (60) days for Temporary Certificate of Completion. Temporary Certificates of Completion or Occupancy are charged at a fee equal to the Permanent Certificate of Completion or Occupancy. 5. CO, CC AND TCC RE-INSPECTION FEE 6. F-Oll When extra inspection trips are necessary due to (1) $ 53.00 wrong address being given on call for inspection to require corrections not being made or completed at time specified or use, a fee for each inspector who must return shall be charged. Building Department Fee Schedule - rev. 11/6 Page 34 of 34 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947-0606 City Hall (305) 949-3 II 3 Fax (305) 947-2150 Building Department (305) 947-5107 Fax City Commission Norman S. Edelcup, Mayor Lewis J. Thaler, Vice Mayor Roslyn Brezin, Commissioner Gerry Goodman, Commissioner Danny Iglesias, Commissioner OF su" A. John Szerlag, City Manager Hans Ottinot, City Attorney Jane A. Hines, CMC, City Clerk MEMORANDUM TO: Clay Parker, Building Official Priscilla Walker, CMC, Deputy City Clerk'?uJoJJ~ FROM: DATE: December 19,2006 RE: Approval of Building Department Fees Amendment Ordinance At its regular meeting of December 14, 2006, the City Commission adopted Ordinance No. 2006-268, which amended Chapter 156 "Fees, Miscellaneous" of the SIB code. Attached is a copy of the revised ordinance. Thank you. :pw Attachments cc: A. John Szerlag, City Manager Hans Ottinot, City Attorney Jorge Vera, Assistant City Manager/Services Doug Haag, Assistant City Manager/Finance Building Department Fee Schedule Amended Trans Memo City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 City Commis.rion Norman S. Edelcup, Mayor Lewis J. Thaler, Vice Mayor Roslyn Brezin Commissioner Gerry Goodman, Commissioner Danny Iglesias, Commissioner (305) 947-0606 City Hall (305) 949-3113 Fax (305) 947-2150 Building Department (305) 947-5 I 07 Fax A. John Szerlag, City Manager Hans Ottinot, City Attorney Jane A. Hines, City Clerk Memorandum TO: VIA: FROM: DATE: RE: The Honorable City Commission A. John Szerlag, City Manger Jorge L. Vera, Assistant City Manager/Services /\--> Clayton L. Parker, Building Official/Administrator\ \..,._..~ December 14,2006 Revision to Building Department's Fee Schedule RECOMMENDATION: It is recommended that the City Commission approves the attached Ordinance proposing a revision of the City of Sunny Isles Building Department's Fee Schedule. REASON (5): The Building Department, as directed by Chapter 156-2 of the Chapter and Code of the City of Sunny Isles Beach, has reviewed the Department's Fee Schedule and has made some minor adjustments to reflect the needs of the City, the Department, and the community as a whole. Among the proposed changes incorporated in the fee schedule as requested ,by the City Commission at the November 16th 2006 Commission Meeting, the Building Department has rounded off to the nearest dollar some of its fees. After carefully reviewing the schedule; fees which are calculated per square footage, per lineal footage, per ton, per Horse Power, per thousand dollars of estimated job value or fractional part thereof, or fees calculated per one hundred dollars of job value or fractional part thereof; remained unchanged. Rounding these figures up or down to the nearest dollar, depending on the case, will cause a great monetary impact to either the residents or the City. On the other hand, fees such as Landscaping for Code Compliance has been changed from $138.67 to $139.00; Tree removal was changed from $16.12 to $16.00; Irrigation System fee Agenda Item CL~ IkJj - () L, Date -. December 14, 2006 Revision to the Building Department's Fee Schedule Page 2 of 2 was modified from $16.80 to $17.00; Mechanical fees on pages 29 and 30 of the schedule were rounded off to the nearest dollar. Contractor Enforcement fees, Criminal Processing Recovery Cost fees, and Florida Building Code - Unsafe Structures fees on pages 31 and 33 were also rounded off to the nearest dollar. As previously presented at the November 16, 2006 Commission Meeting, because of the upcoming implementation of a new software program in our Department, and in an effort to facilitate and make the fee schedule user friendly, we have re-c1assified and re- codified certain items and sections of the fee schedule. Equally relevant, among the proposed adjustment to the schedule, we have changed the Landscape Architectural Review Fee, to reflect the current hourly rate charged by the City's Landscape Architect Consultant. We are proposing to change the Building pool deck fee from $112.00 to $2.50 per each $100.00 dollars of estimated job value. We are also proposing to increase our current demolition fee from $10.00 to $50.00 for additional 1000 sq ft of demolition or fraction thereof. We have added a section for the replacement of broken glass for windows and doors. Equally important, and due to the increasing amount of applications for tile installation received by our Department, we have exclusively added a section to address tile installation. Along with the above mentioned changes, we have also made other adjustments to the Electrical and Mechanical schedule which encompass minor modifications to some fees as detailed in the attached, proposed fee schedule. CLP:pv Enclosure(s)