Loading...
HomeMy WebLinkAboutSoutheastern Engineering Contractors, Inc. .. , 12054 NW 98th Avenue Hialeah Gardens, FL. 33018 Tel: 305-557-4226 Fax: 305-557-8568 Southeastern Engineering Contractors, Inc. PROFESSIONAL CONSTRUCTION SERVICES FOR CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENT RECEIVED SEP 2 4 2010 CITY OF SUNNY ISLES BEACH MIAMI-DADE COUNTY, FLORIDA CIty 01 SUMY 1810. Beach Office of lhe CI Clerk Date: SEPTEMBER 24, 2010 TABLE OF CONTENS 1-Company Information 2-Narrative description of current and previous experience 3-List of Projects 4-Proof of authorization to transact in Florida 5-Name, title, qualifications, experience and contact information of proposed personal to be assigned to this Project 6-Schedule and estimated number of calendar days 7-Detailed financial cost breakdown 8-Sworn statement pursuant to Section 287.133(3)(A), Florida Statutes 9-Non-collusive Affidavit - DESCRIPTION OF CURRENT AND PREVIOUS EXPERIENCE ON A PROJECT SIMILAR TO THE CENTRAL ISLAND EMERGENCY OUTFALL IMPROVEMENT PROJECT City of Sunny Isles Beach City of Miami City of Hialeah Town of Golden Beach Town of Bay Harbor Islands Drainage & Street Improvements This Project is located along the north end by NE 182rd Street, along the south by NE 174th Street and the Dumfoundling Bay and Collins Ave. along the west and east respectively. The Project consist of the following: Milling and resurfacing, pavement reconstruction of all the local streets. Design and construction of a new storm sewer system and Establishing a network of drainage deep wells for discharge of the storm water runoff. Fairlawn Storm Sewer Improvement Phase III Project B-50704 The location of the Project is in the boundary of West Flagler Street and SW 8th ST between SW 56th Ave. and SW 47th Ave and West Flagler St and NW 5th ST between NW 52 Ave. and NW 50th Ave. The scope of work includes construction of new storm drain that connects to an existing drainage, roadway milling and resurfacing, ADA ramps installation and damaged sidewalk replacement, re-grade and/or reconstruct swale areas to street blocks impacted by drainage improvements activities East 4th Avenue-from E 25th ST to East 32nd ST This Project is located at East 4th Avenue-from E 25th ST to East 32nd ST The Project consist of the complete reconstruction of East 4th Ave., including new sidewalk, curb and gutter and drainage improvements consisting of new draining inlets, 18" storm sewer cross drainage pipe, and Exfiltration trench (French-drain). Also proposed in the project scope are pavement milling and resurfacing. Golden Beach Drive Streetscape Improvements, Town-wide storm water improvements, water improvements, water main reconstruction and underground conversion of utilities. Work for this contract include: Golden Beach Drive Streetscape (re- alignment of road, new concrete curb and gutter, 7 ft wide sidewalk, landscaping improvement, irrigation, and relocation of existing street lights); Town-wide storm water drainage improvements(installation of structures and construction of pump station and outfalls to intra- costal); Town wide replacement of water main with new 8" D.I.P. water-main and conduit installation for undergrounding of utilities (FPL, AT & T, and Atlantic Broad Band.) Community Enhancement PH-3 Utility Improvements Work for this contract include all items necessary for the construction of new water main and services in existing roadways, including saw-cut the road before excavating trenches for pipes and shall be responsible for temporary restoration of the asphalt surfaces and final restoration. . . . . . . PREVIQUS EXPERIENCE. . PROJECTS COMPLETED (LAST 5 YEARS) (fully bonded) Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Central Island Drainage & Street Improvements $6,646,141.00 Unit Prices City of Sunny Isles Mr. Rick Conner, City Manager, 786-208-3498 February 2010. Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Belen Pump Stations $6,391,000.00 Unit Prices Miami Dade County, Public Works Dept. Mr. Antonio Cotarello, P.E., Div. Chief 305-375-2116 December 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Basin 21 Drainage Improvements and Pump Station $2,600,000.00 Unit Prices Miami Dade County, Public Works Dept. Mr. Antonio Cotarello, P.E., Div. Chief 305-375-2116 September 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: District 3 Roadway Improvements $1,505,100.00 Unit Prices City of Miami Mr. ala A. Aluko, Director CIP, 305-416-1280 March 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: NE 1 th Ave Roadway Improvements $810,474.00 Unit Prices City of North Miami Mr. Aleem Ghany, P.E., 786-586-7141 February 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: NW 62nd Street Roadways Improvements $6,378,000.00 Unit Prices Miami Dade County, Public Works Dept. Mr. Antonio Cotarello, P.E. Div. Chief 305-375-2116 December 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Downtown Beautification Project $1,295,000.00 Job Order Contract City of Miami Mr. ala A. Aluko, Director CIP, 305-416-1280 December 2008 2 ~!i!!R~G~~~~!I~ PREVIOUS EXPERIENCE..... . Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Hanford Blvd Streetscape $8,100,000.00 Unit Prices City of North Miami Beach Mr. Hiep Huynh, P.E. City Engineer, 305-948-2925 August 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Canal 13 Control Structure $1,037,046.00 Unit Prices South Broward Drainage District Mr. Leo Schwartzberg, P.E. Director, 954-680-3337 July 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Buena Vista Phase I, II, III, Paving & Drainage $3,010,111.00 Job Order Contract City of Miami Mr. ala A. Aluko, Director CIP, 305-416-1280 June 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: 54" dia. Force Main, Microtunnellnstallation at NW 62nd Street $1,995,925.00 Unit Prices Miami Dade Water & Sewer Mr. Nelson Cespedes, Project Manager, 305-607-0799 February 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: NE 4th Street Streetscape $1,007,000.00 Job Order Contract City of Miami Mr. Mr. ala A. Aluko, Director CIP, 305-416-1280 December 2007 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Ponce de Leon Boulevard Median Improvements $1,800,374.00 Unit Prices City of Coral Gables, Public Works Dept. Mr. Alberto Delgado, P.E., Director, 305-460-5001 June 2006 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: S-718, 8" Water Main Installation $643,000.00 Unit Prices Miami Dade Water & Sewer Mr. Nelson Cespedes, Project Manager, 305-607-0799 March 2006 3 ~~!R~G~~~~S~~ i PREVIOUS EXPERIENCE Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Arch Creek Pump Stations & Drainage Improvements $4,869,000.00 Unit Prices Miami Dade County, Public Works Dept. Mr. Pedro Marzan, Project Manager, 305-281-9062 December 2005 20 inch Transmission Main at Strand Ave Bridge $342,000.00 Unit Prices City of North Miami Beach Mr. Hiep Huynh, P.E., City Engineer, 305-948-2925 May 2005 24",36",42",48" dia. Water Mains Installation, S-746A & S-746B $2,657,000.00 Unit Prices Miami Dade Water & Sewer Mr. Humberto Codispoti, P.E. , Assist. Director, 305-790-0235 March 2005 Corona del Mar Roadway Improvements $1,319,830.00 Unit Prices City of North Miami Beach Mr. Hiep Huynh, P.E., City Engineer, 305-948-2925 February 2005 Paving & Drainage County Wide (FEMA) $8,000,000.00 Unit Prices DERM,Miami Dade County Mr. Eduardo Vega, P.E. Assistant Director, 786-552-8571 January 2005 NW 11 oth Street Improvements $2,840,000.00 Unit Prices Miami Dade County Public Works Dept. Mr. Antonio Cotarello, P.E. Div. Chief, 305-375-2116 August 2004 NE 6th Ave Improvements $3,458,000.00 Unit Prices City of Pompano Beach Mr. Randall Fowler, P.E., City Engineer, 954-786-4144 August 2004 4 ~~!R~G~~~~l,!! I I li PROJECTS UNDER CONSTRUCTION (Fully Bonded) Project title: Capital Improvement Project Type of Construction: Roadway, Drainage, Pump Station Contract Amount: $13,926,071.00 Type of Contract: Unit Prices Client: City of Golden Beach Client's Rep: Mr. Ramon Castella, P.E., 305-445-2900 Completion Date: Dec. 2010 . Project title: Transfer Pump Station, Contract No. S-806 Type of Construction: Pump Station Contract Amount: $28,305,698.00 Type of Contract: Unit Prices Client: Miami Dade Water & Sewer Department Client's Rep: Ms.Alma Santiago, P.E., 786-552-8150 Completion Date: Jan. 2012 . Project title: Roadway Improvements East 4th Ave, Hialeah Type of Construction: Roadway, Drainage Contract Amount: $917,112.57 Type of Contract: Unit Prices Client: City of Hialeah Client's Rep: Mr. Jose Sanchez, Streets Engineer, 305-687-2611 Completion Date: July 2010 Project title: 4" Force Main Installation Type of Construction: Force Main Contract Amount: $134,879.39 Type of Contract: Unit Prices Client: City of Plantation Client's Rep: Mr. John Adams, Utilities Project Specialist, 954-865-8296 Completion Date: Sept 2010 Project title: Fairlawn Storm Sewer Improvements Type of Construction: Roadway, Drainage Contract Amount: $3,555,455.73 Type of Contract: Unit Prices Client: City of Miami Client's Rep: Mr. ala A. Aluko, Director CIP, 305-416-1280 Completion Date: April 2011 Pi.! il' ofJtheostern \\ ENGINEERING CONTRACTOH~ /NC II ;w ! H PROJECTS UNDER CONSTRUCTION (Fully Bonded) Project title: NE 172 Street I NE 170 Street Improvements Type of Construction: Storm Sewer Pump Station Contract Amount: $1,394,000.00 Type of Contract: Unit Prices Client: City of North Miami Beach Client's Rep: Mr. Hiep Huynh, P.E. City Engineer, 305-948-2925 Completion Date: April 2011 Project title: Utilities Improvements Phase III Type of Construction: Water Main Installation Contract Amount: $1,161,000 Type of Contract: Unit Prices Client: Town of Bay Harbor Client's Rep: Mr. Randy Daniel, P.E., Town Engineer Completion Date: July 2011 &' i~' r.,~; ofJ'theosfern ENGINEER/NG CONTRACTOR~ /NC FIRM REFERENCES City of North Miami 17050 NW 19th Avenue North Miami Beach, Florida 33162 Hiep Huynh, City Engineer (305) 336-9924 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Rick Connor, City Manager (305) 792-1928 Miami Dade County Water & Sewer 111 NW 1 Street Miami, Florida 33128 Eduardo Vega, PE, Assistant Director (305) 375-2960 City of North Miami 1815 NE 150th Street North Miami, Florida 33181 Aleem A. Ghany, PE, Public Works Director (305) 895-9833 ~~!R~G~O~!~S~'~ - Florida Department. of Transportation CHARLIE CRIST GOVERNOR 605 Suwannee Street Tallahassee, FL 32399-0450 STEPHANIE C.KOPELOUSOS SECRETARY July 2, 2010 SOUTHEA~TERN ENGINEERING CONTRACTORS, INC. 12054 NW'98TH AVE HIALEAH GARDENS FL 33018 *REVISED* RE: CERTInCATE;pr..qp?+I~l<;:~IPN.. Dear Sj r/Madam: The Department of Transportation has qualified your company for the amount and the type of work indicated below. Unless your company is notified otherwise, this rating'wiil expire 6/30/2011. However, the new applicatLon is due 4/30/2011. In accordance with S.337.14 (1) F.S. your next application must be filed within (4)'months of the ending date of the applicant's audltedannual financial . statements and, if applicable, the audited interim financial statements. Section .337.14 (4) F.S. provides that your certificate will be valid foi 18 months Bfter your financial statement date. This gives a two month period to allow you .tobid .on jobs as we process your new application for qu.alification. .To remainqualifi'ed with the Department, a new application must be submitted subsequent to any significant change in the financial position or the structure of your firm as described in Section 14-22.005(3), Florida Administrative Code. MAXIMUM CAPACITY RATING: $47,700,000.00 FOOT APPROVED WORK CLASSES: DEBRIS REMOVAL (EMERGENCY), DRAINAGE,....FLEXIBLEPAVING, GRADING, HOT PLANT-MIXED BITUM. .COURSES, MINOR BRIDGES FOOT APPROVED SPECIALITY CLASSES OF WORK: "...~,,_.. UNDERGROUND UTILITIES (WATER & SEWER) ~....SE~ER PUMOP ~TATION . . . .' Please b~ advised thE .Departtirt:nt of Transport:atlon.~ha.:s c~n'~iaeredyour company's qualification in all work classes requested. We have evaluated your company's organization, management, work experience, work performance and adequacy of equipment as directed by section 14~22.003, Florida Administrative Code. Based .on this evaluation, the Department is not able, at this time, to prequalify your company for the worJ<; classes: PORTLAND CEMENT CONCRETE. www.dat.state.fl.us @ RECYCLED PAPER E 1915,.,.;,.:.::>:,:.":':.::',,.... .9& ./~:.:::n~~~~;i1~~r,~": ; DOMINGUEZ EDUARDO .~f' "\';} , ; .Is cElrtified under the provisions of Chapter 10 of Miami-D~~~t$511\ly l'(;'..ti~.l;f.~\~j_ .CTQB Construction Trades Qualifying Board BUSINESS CERTIFICATE OF COMPETENCY ~~l~G~~l~l,~ EDUARDO DOMINGUEZ, PE, GC President / Principal in Charge Professional Experience Southeastern Engineering Contractors, Inc. President / Professional Civil Engineer (1984 - Present) Miami-Dade County Public Works Department, Engineering & Services Division Project Engineer (1974 - 1984) Dagma Building Corporation - Project Supervisor (1973 - 1974) Michigan Testing Engineering, Inc. - Assistant Engineer Manager (1971 - 1973) Education Florida International University 1974, Bachelor of Science in Civil Engineering Florida Atlantic University 1969 - 1970, Civil Engineering Miami Dade Jr. College 1969, Associate in Art in Civil Engineering Technology Licenses State of Florida Registered Professional Engineer, No. 0034-223 State of Florida Registered General Contractor, No. 0066528 Broward County General Engineering License, CC No. 93-1360 Miami-Dade County General Engineering License, No. E1915 Professional Affiliations Florida Engineering Society American Society of Civil Engineers National Society of Professional Engineers References City of North Miami 17050 NW 19th Avenue, North Miami Beach, Florida 33162 Heip Huynh, PE, City Engineer, (305) 336-9924 City of Sunny Isles Beach 17050 NE 19th Avenue, Sunny Isles Beach, Florida 33160 Rick Connor, Public Works Director, (305) 792-1928 Miami-Dade County Water and Sewer 111 NW 1st Street, Miami, Florida 33128 Eduardo Vega, PE, Assistant Director, (305) 375-2960 City of North Miami 1815 NE 150th Street, North Miami, Florida 33181 Aleem A. Ghany, PE, Public Works Director, (305) 895-9833 12054 NW. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 ~~!R~G~~1~l,~ EDUARDO DOMINGUEZ, Jr. Senior Project Manager Professional Experience Southeastern Engineering Contractors, Inc. Vice President / Senior Project Manager (1992 - Present) Mr. Dominguez is a highly accomplished Vice President / Senior Project Manager with a verifiable track record of managing complex projects. He has strong management skills on large projects. He is in charge of the company's Project Managers, Superintendent and Administrative staff. His additional areas of expertise include: Estimating Project Scheduling Reports Documentation Project Managing & Tracking Report Preparation Project Development Process Improvements Safety Compliance Change Control Management Project Risk & Scope Project Planning M.O.T. Education Hialeah - Miami Lakes Senior High School High School Diploma Technical Certifications Microsoft Excel/Advanced Power Point Primavera P3 Scheduling Primavera Project Planner, Suretrack Programs Florida Advanced Work Zone Traffic Control OSHA Roadway Safety Training Languages Fluent in English and Spanish References Miami-Dade County Public Works 111 NW 1st Street, Suite 1420, Miami, Florida 33128 Pedro Marson, County Project Manager, (305) 281-9062 City of North Miami 17050 NW 19th Avenue, North Miami Beach, Florida 33162 Heip Huynh, PE, City Engineer, (305) 336-9924 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 Rick Connor, Public Works Director, (305) 336-9924 Town of Golden Beach 1 Golden Beach Drive, Golden Beach, Florida 33160 Alexander Diaz, Town Manager, (305) 932-0744 12054 N.W. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 FABIO AN Project Manager Professional Ex Mr. Angarita has responsible for t from beginning to in charge of the compared to data the staff and sup MDC-DERM Se MDC Camillus H MDC-WASD Co SW 288th St. be MDC-WASD Co Main on NW 1th City of Tamarac MDC-WASD Wa 26th St. & 12th - Petro Hvdro, Inc. City of Miami Ro MDC FEMA Drai Basin City of Coral Spr City of Tamarac Tamarac Lakes Broward County FDOT SR 915 D FDOT Roadway 88th St. Education Colombian School 2001, Actualizatio References City of Sunny Isle Bill Evans, Public City of Miami, 444 Felix Rodriguez, C South Broward Dr Leo Schwartzberg GARITA .- ~~t~G~~t~sr,~ perience over 8 years of experience in all phases of construction / project management. He is he planning, organization, directions, control and evaluation of construction projects end according to work schedule, contract conditions and planned budget. He is also plan and preparation of schedules and stages to be followed, verifying progress , directing the purchase of all construction materials and acquisition of grounds, hiring ervising the work of subcontractors and subordinate employees. Pro'ect Name aboard Access Ditch Enclosure ouse - Water Main Extension ntract W-866 - 36" Water Main at tween 152nd Ave. & 14th Ave. ntract ER - 47862 - 12" Force Street between 37th & 33rd Ave. 6" FM and connection to lift station ter Main Extension on SW 24t - 129th Ave. ings Reconstruction of NW 44th St. - Water Main Replacement of Blvd. March 2005 - Ma 2005 1m rovements raina e & Roadwa 1m . Imp. at A1A between 75t St. & Nature of Work Draina e & Roadwa 1m . Water Main Water Main Amount $400,000 $100,000 $1,050,000 Force Main Force Main Water Main $750,000 $150,000 $900,000 Nature of Work Draina e & Roadwa 1m Drainage & Roadway Restoration WM Replacement & Roadway Reconstruction WM Replacement, Roadway Restoration & Resurfacin Sewer & Roadwa Reconst. Concrete, Millin & Resurfacin Concrete, Milling & Resurfacing Amount $850,000 $1,175,000 $760,000 $750,000 $1,050,000 $1,150,000 $1,330,000 of Engineering 1998, Bachelor of Science in Civil Engineer n in Design of Aqueduct Systems s Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 Works Director (786) 586-7533 SW 2nd Avenue, Miami, Florida 33130 ity Construction Manager (305) 216-9544 ainage District, 6591 SW 60th Avenue, Southwest Ranches, Florida 33331 , Director (954) 680-3337 12054 N.W. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 - (6!!l~G~~t~n~ RENE HERNANDEZ Superintendent / Safety Officer Professional Experience Southeastern Engineering Contractors, Inc. General Superintendent (1990 - Present) City of Miami Public Works Department 444 SW 2nd Avenue, 8th Floor, Miami, Florida 33130 Public Works Inspector (1988 - 1990) Hightech Engineering, Inc. Owner / President (1980 - 1988) Gianneti Construction, Inc. Supervisor of Roadway (1974 - 1980) Mr. Hernandez has more than 34 years of experience in roadway and Water & Sewer projects. He has supervised and satisfactorily completed numerous Public Works Projects under contract with Miami Dade County and Broward County. He has acted in the capacity of General Superintendent for municipal projects ranging from $2,000,000 to $14,000,000. He has also successfully completed paving and drainage projects for both Broward County Aviation Department and Miami-Dade County Aviation Department. He was the owner and president of Hightech Engineering, Inc. for 8 years constructing lift stations and Water & Sewer projects. Education Hialeah High School 1966, High School Diploma References Miami-Dade Water & Sewer 9071 SE 38th Avenue, Miami, Florida 33165 Nelson Cepedes, Project Manager, (305) 607-0799 City of North Miami 1815 NE 150th Street, North Miami, Florida 33162 Aleem A. Ghany, PE, Public Works Director, (305) 895-9833 City of North Miami 17050 NE 19th Avenue, North Miami Beach, Florida 33162 Jimmy Davis, Construction Manager, (305) 733-4674 Dade County Public Works 111 NW 1st Street, Suite 1420, Miami, Florida 33128 Pedro Marson, County Project Manager, (305) 281-9062 12054 NW. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 CIJ I- Z W ~ W > o 0::: a.. ~ CIJ~ ...J::J ...Jc <Cw LLJ: 1-0 :J (/) 0 o Z"" >- Q~ 01-(3 z<(C( Wl-<( C) Z ~ 0::: w W W ~~ ~ ...J 0 Wa..~ C:!:~ Zl-t:) <c 0 W ...JW CIJ"" _0 ...JD:: <co.. 0::: I- Z W o - 00 ~ W W ~ ,.... ~ W W ~ <0 ~ W W ~ . I.() ~ ~ W W ~ II ..,. ~ W W ~ (") ~ W W ~ N m ~ W W ~ ...... ~ W W ~ f-- ...J ...J <( 0- ~ ~ CJ) => ...J I-- <( CJ) ~ W Z W () :5 C/) W () C/) 0 <( 0- W C/) u.. Z C( W a W a => I-- I-- <( i= I-- W I-- Z ...J () ...J a ...J <.9 z => C( <( i= <( W W C( () I ~ W C/) > Z 0- <( Z W I-- a C/) z z C( <( I-- a I-- C/) Z :;x: a W <( Z C/) C( 0 a () <( a C/) z i= W W 0- C( I-- W z i= <.9 <.9 i= 0 W C/) <.9 <( <( !::: ::2: i= z :5 z z <( I-- W ::2: C( => a <( > I W Z C/) :> i= <.9 ...J i= i= <( () C( C( i= 0 a CD () i= z <( C/) ~ () z () 0 C/) W I-- a a z => I-- CJ) 0 () a ...J ~ I-- X X X W Z Z W , <( ...J C/) W W W C( a <( x z W I-- I-- i= W C( a <( z ...J ...J C( I-- () ...J => I => C/) ;:s C( a a I-- ::i 0- W <( <( :5 ...J ...J <( ...J I-- a ::i 0- 0 0- > > ...J ...J > I-- ::2: <( z W I => 0- 0- a a => <( <( a W ...J I <( C/) () CD I-- a ::2: ::2: <.9 I-- I-- ::2: C( ...J 0- W a z a W I ..,. W W W C/) C/) W a <( C/) ...J ...J => ::2: C/) C/) N C( C( C( z z C( () ~ <( () () 0- BID BREAKDOWN PROFESSIONAL CONSTRUCTION SERVICES FOR CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS CITY OF SUNNY ISLES Item No. Item Description Quantity Unit Unit Price Price MOBILIZATION LS 1,300.00 1,300.00 2. TESTING AND SURVEYING LS 1,400.00 1,400.00 3 MAINTENANCE OF TRAFFIC 1 LS 1,100.00 1,100.00 4 FLOATING TURBIDITY BARRIER 50 LF 6.33 316.25 5 STAKED SILT FENCE 200 LF 6.33 1,265.00 6 ROCK BACKS 50 EA 4.60 230.00 7 SYNTHETIC BALES 20 EA 8.05 161.00 8 ASPHALTIC REMOVAL (1.5") 102 SY 3.65 371.84 9 ASPHALTIC CONCRETE (1.5") 102 SY 8.74 891.48 10 L1MEROCK BASE (6") 40 CY 41.54 1,661.52 11 TYPE B STABILIZATION (12") 80 CY 22.66 1,812.40 12 FINISH SOIL LAYER 2" 250 SY 2.07 517.50 13 REMOVAL AND DISPOSAL OF EXISTING SIDEWALK 20 SY 9.32 186.30 14 CONCRETE SIDEWALK 4" THICK 20 SY 39.10 782.00 15 TRENCH EXCAVATION 200 LF 6.33 1,265.00 16 CONCRETE CURB AND GUTTER (TYPE F) 20 LF 17.25 345.00 17 TRENCH DRAIN 12" 200 LF 161.00 32,200.00 18 CONNECT TO EXISTING DRAINAGE STRUCTURE (CORE & TIE) EA 460.00 460.00 19 DISH BOTTOM INLET (TYPE C) (<10') 2 EA 1,684.75 3,369.50 20 CONTROL STRUCTURE 1 EA 8,567.50 8,567.50 21 DRAINAGE PIPE A-2000 (24") 330 LF 60.94 20,109.71 22 28" ROUND CORE IN EXISTING SEAWALL 2.5' EA 1,725.00 1,725.00 23 MANATEE GUARD EA 621.31 621.31 REMOVAL AND RESTORATION OF WALL TO PROVIDE 24 ACCESS TO SEAWALL LS 2,070.00 2,070.00 25 TREE REMOVAL 1 EA 575.00 575.00 26 ST. AUGUSTINE SOD 250 SY 5.75 1,437.50 TOTAL ALL ITEMS 1$ 84,740.811 Total Project Cost Written E lq h~'( k,vr fk.cvS;>tl\r-c\ Se\J@V\ 1-wV\~~ ~~'( C{v-c,( 6'/;00 Dollars SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to C i+'f 0 ~ bu\"'\ ~l{ Is.\e~ (?eCl.c:."-' by Southeastern Engineering Contractors, In'A. for fro~~t()Y\~ ~~vc+,tMS-?yV'ic.QS ~ CCM(u..Q IdawR (7""w'1e~ O\)t-~\\ J.: VV\. '9 \'0 -J e \M.Q....:\. whose business address is 12054 N. W, gsth Avenue, HiaJeah Gardens, Fl Ja018 and (if applicable) its Federal Employer Identification Number (FEIN) sq ~ '242 ~850 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. I understand that a "public entity crime" as defined in Paragraph 287. 133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non jury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287. 133(l)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any n~tural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. Exhibit "A" 14 - 5. I understand that a "person" as defined in Paragraph 287.133(l)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the ~lowing three (3) statements is applicable.) -I- (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO , WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE C~TEG RY T OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS Fa . Ed Dominguez SIGNATURE 0 (Printed or Typed Legal Name of Affiant) 15 State of Florida of County of Miami-Dade) Sworn to and subscribed before me this Ed . U-~~\V\Cjut-7.. - ~~ ~L. ,2010 by day of Notary Seal: ......" ZOE SANTEIRO ",'~'t"fI<</'_ ::~I. . 'l'f'~ COMMISSION # 0096969 =*. .*: MY ~~~....~: EXPIRES March 09. 2014 ""~~\' FloridaNotaryServlce,ccm 407) 398-0153 Notary's Name Printed, Stamped or Typed Personally Known: V or Produced Identification Identification Produced 16 ~ NON-COllUSIVE AFFIDA VIT State of Florida ) )ss County of Miami-Dade) Ed Dominguez being first duly sworn, deposes and says that: (1) He/she is the (Owner, Partner, Officer, Representative, or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this affiant. Exhibit "B" 17 ~ FURTHER, AFFIANT SAYETH NA UGHT. ~-..oo.emem ~ OtMnctors, Inc.( d) o;)UUl,J I ven or Ed Dominguez /? President/Owner Sworn to and subscribed before me this8-?:' day of ~,~ . . 2010, by -Ed ~\V\~ut'7... (President/Owner) of ~Vlt'R<:'\-evV\ ~~IVl<-l'(I"<1 C'.>t~"~'iioho i~ _~ me or has produced a as identification. ZOE SANTEIRO N # 00969694 EXPIRES March 09. 2014 FloridaNotaryServoce.com My Cotntnission Expires: J OJ\.~Yi ) dOl LI My Commission No.:DDg ~q <.cf:1 q 18 THE AMERICAN INSTITUTE Of ARCHITECTS I AlA Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we SOUTHEASTERN ENGINEERING CONTRACTORS, INC.. tHere inserl full name and oddr... or legollille of Contraclor) 12054 NW 98 AVE., HIALEAf{ .GARDENS, FL 33018 as rnnci~al, hereinafter called the Principal, and HARTFORD FIRE INSURANCE COMPANY ONE HARTFORD PLAZA, HARTFORD, CT 06115 a corporation. duly organized under the. laws of the S-tate of CONNECTICUT as Surety, hereinafter called the Surety, are held and firmly bound unto CITY OF SUNNY ISLES (Here inserl full name and address Ot legal tllle 01 Owner) 18070 COLLINS AVE, SUNNY ISLES, FL 33160 as Obligee, hereinafter called the Obligee, in the sum of Fi ve Percent of Amount of Bid Dollars ($ 5 % l, for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselvesr our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for IHere insert full nome ond oddr.ss or legol litl. of Surety) (Here insert full name, address and description of project) PROFESSIONAL CONSTRUCTION SERVICES FOR CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or ContraCl Documents With good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event 01 the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. Signed and sealed this ~ ~ '" (Witness) 24TH day of SEPTEMBER ~ 2010 ()~ ~, CONTRACTORS, INC (Seal) (Witness) HARTFORD FIRE I..~J RAMON A RODRI GUE~.tle) (Seal) Atty-in-fact &Fla Res Agent AlA DOCUMENT A310 . BlD BOND. AlA ~. FEBRUARY 1970 ED . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W., WASHINGTON, o. C. 20006 1 POWER OF ATTORNEY Direct Inquiries/Claims to: THE HARTFORD BOND, T-4 P.O. BOX 2103,690 ASYLUM AVENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757 -5835 Agency Code: 21-221533 KNOW ALL PERSONS BY THESE PRESENTS THAT: CK:J Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut CK:J Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana CK:J Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut CJ Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut CJ Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana CJ Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois CJ Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana CJ Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: Emesto Freyre, Fausto Alvarez, Ramon A. Rodriguez, Victor M. Pan tin, Carl H. Moll, Carlos Lacasa, William E. Beckham, Marc D. Jacobson, Michael L. Keeby, Mayra Rodriguez of Miami, FL their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by rxI, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. ;IA"'."":-" ~l t(il.,...~ - ~...\. ;Q ~~ ~\ ;:;: * J;:! \";;\191~/iJ ~""":;'''lil''.'''''-'''''':~''.II''' '''''''r~~~~~~....(l' ;.~.~~ !~.,y'.;.r- ~..~\ i. (~"-'D"",,(". ... ... ~ ~;;i"",. gt:'~ r;\ 1979 iii \....'....~o/ ~~ f~O Ct. ~ \\\ \ ~.N--"\ \. \, "-.J . .~ ~~~~<- Paul A. Bergenholtz, Assistant Secretary David T. Akers, Assistant Vice President STATE OF CONNECTICUT} ss. Hartford COUNTY OF HARTFORD On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. ~/ -p/ D c.::0 ( ........./""- Scott E. Paseka Notary Public My Commission Expires October 31, 2007 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of September 24, 2010. Signed and sealed at the City of Hartford. "~III"'1l>" "~.Cl tQ.,~~ rJ'..~#~\ i;/~..~"CQ\~\ ;~. 1t 1-' i::\ 107<;) ::, \~>:.~..~._.~...::~'f~ '~..,,::..~~~~..'" ""~$'" !~~ ....<1_\ 1 ~ I \-ro"o'''''f'o.~"$l J:i . :';; h'.lQ79j;! \.\::.~-"". ~.;;I -,~~~? /'. - .:. liL<:,\ CV))l~ (, [U . Gary W. Stumper. Assistant Vice President POA 2004 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. Financial Statements and Independent Accountants' Review Report June 30, 2009 and 2008 J.lABRADOR, P.A. CERTIFIEJ PUBLIC ACCOUNTANTS Suite 302 85 Grand Canal Drive Miami, Florida 33144 JL C. ... iRm ......A...mm.. ... . .c"-' .".,0. _. 0 . 0: TEL. (305) 262-1600 FAX (305) 262-1601 E-mail: info@labrador-cpa.com www.labrador-cpa.com MEMBERS: AMERICAN & FLORIDA INSTITUTES OF CERTIFIED PUBLIC ACCOUNT ANTS NATIONAL ASSOCIATION OF CERTIFIED VAlllATlnN ANAl YSTS "INDEPENDENT ACCOUNTANTS' REVIEW REPORT" To the Stockholders SOUTHEASTERN ENGINEERING CONTRACTORS, INC. We have reviewed the accompanying balance sheets of SOUTHEASTERN ENGINEERING CONTRACTORS, INC. as of June 30, 2009 and 2008 and the related statements of income and retained earnings and cash flows for the six months then ended, in accordance with Statements on Standards for Accounting and Review Services issued by the American Institute of Certified Public Accountants. All information included in these financial statements is the representation of the management of SOUTHEASTERN ENGINEERING CONTRACTORS, INC. A review consists principally of inquiries of company personnel and analytical procedures applied to financial data. It is substantially less in scope than an examination in accordance with generally accepted auditing standards, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opmlOn. Based on our review, we are not aware of any material modifications that should be made to the accompanying financial statements in order for them to be in conformity with generally accepted accounting principles. Our review was made for the purpose of expressing limited assurance that there are no material modifications that should be made to the financial statements in order for them to be in conformity with generally accepted accounting principles. The information contained on the schedules of earnings from contracts, completed contracts, contracts in progress and general and administrative expenses is presented only for supplementary analysis purposes. Such information has been subjected to the same inquiry and analysis procedures applied in the review of the basic financial statemen,ts and we are not aware of any material modifications that should be made to them. q/f/. I) 1 / /1 Se,pte11J9.er 21, 2009 Miami;'Florida fJ 11-- 2 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. BALANCE SHEETS JUNE 30, ASSETS 2009 2008 CURRENT ASSETS Cash and cash equivalents $ 2,875,221 $ 1,019,660 Contracts receivable 7,364,618 6,083,254 Costs and estimated earnings in excess of billings on uncompleted contracts 115,913 Total current assets 10,239,839 7,218,827 PROPERTY AND EQUIPMENT - NET 876,804 808,392 OTHER ASSETS 14,557 13,101 $ 11,131,200 $ 8,040,320 LIABILITIES AND STOCKHOLDERS' EQUITY CURRENT LIABILITIES Short-term borrowings $ $ 136,972 Current portion of long-term debt 181,435 165,245 Accounts payable - trade 1,594,741 1,771,742 Accrued expenses 12,396 29,565 . Billings in excess of costs and estimated earnings on uncompleted contracts 4,477,102 2,913,776 Total current liabilities 6,265,674 5,017,300 LONG - TERM DEBT 286,100 168,866 DUE TO STOCKHOLDERS 200,000 200,000 STOCKHOLDERS' EQillTY Common stock - 50 shares of $1 0 par value authorized, issued and outstanding 500 500 Paid-in capital in excess of par 69,000 69,000 Retained earnings 4,309,926 2,584,654 4,379,426 2,654,154 $ 11,131,200 $ 8,040,320 Read Accountants' Review Report The accompanying notes are an integral part of this statement " .) SOUTHEASTERN ENGINEERING CONTRACTORS, INC. STATEMENTS OF INCOME AND RETAINED EARNINGS FOR THE SIX MONTHS ENDED JUNE 30, 2009 2008 Contract revenues earned $ 10,226,909 $ 7,260,004 Cost of revenues earned 8,400,761 5,804,810 Gross profit 1,826,148 1,455,194 General and administrative expenses 924,294 763.1 89 Income from operations 901,854 692,005 Other income and (expenses) Gain on sale of asset 29,000 Interest income 5,037 9,370 Interest expense (22,205) (59,148) Net Income 913,686 642,227 Retained earnings at the beginning of the year 3,609,540 1,942,427 Dividend distributions (213,300) Retained earnings at the end of the six months $ 4,309,926 $ 2,584,654 Read Accountants' Review Report The accompanying notes are an integral part of this statement 4 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. STA TEMENTS OF CASH FLOWS FOR THE SIX MONTHS ENDED JUNE 30, 2009 2008 Cash flows from operating activities: Net Income $ 913,686 $ 642,227 Adjustments to reconcile net income to cash provided by operating activities: Depreciation 108,147 129,599 Gain on sale of assets (29,000) Changes in assets and liabilities: Decrease (increase) in contracts receivable (567,506) 74,025 Decrease (increase) in costs and estimated earnings in excess of billings on uncompleted contracts 222,970 (71,061) Increase in other assets (1,636) Decrease in accounts payable - trade (737,870) (179,596) Increase (decrease) in accrued expenses (5,366) 20,830 Increase in billings in excess of costs and estimated earnings on uncompleted contracts 1,235,634 113,070 Cash flows provided by operating activities 1,140,695 727,458 Cash flows provided by (used in) investing activities: Proceeds from sale of assets 29,000 Purchase of property and equipment (255) 28,745 Cash flows used in fmancing activities: Repayment to stockholders (197,000) Repayment of short-term borrowings (99,425) Dividend distributions (213,300) Repayment of long-term debt (116,113) (120,491) (329,413) (416,916) Net increase in cash and cash equivalents 840,027 310,542 Cash and cash equivalents at the beginning of the year 2,035,194 709,118 Cash and cash equivalents at the end of the six months $ 2,875,221 $ 1,019,660 Supplementary disclosure of cash flows information Non-monetary investing and financing transactions: Debt incurred to acquire property and equipment Cash paid for interest $ $ 112,039 22,205 $ 114,725 $ 59,148 Read Accountants' Review Report The accompanying notes are an integral part of this statement 5 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 1- SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES General The Company was incorporated under the laws of the State of Florida and began operations in June, 1984. The Company was created for the purpose of performing general construction contracts. The work is normally performed under fixed-price contracts. All projects are located in the South Florida area. Use of estimates The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. Revenue recognition Contract revenue is recognized using the percentage-of-completion method. Under this method, the percentage of contract revenue to be recognized currently is computed as that percentage of estimated total revenue that incurred costs to date bear to total estimated costs, after giving effect to the most recent estimates of cost to complete. It is reasonably possible that changes in estimates may occur in the near term. Revisions in cost and revenue estimates are reflected in the period in which the facts which require the revision become known. When the revised cost estimates indicate a loss on an individual contract, the total estimated loss is provided for currently in it:> entirety without regard to the percentage of . completion. Contract costs include all direct material, labor, subcontractor costs and those indirect costs related to contract performance, such as indirect labor, supplies, equipment rental, and repairs. Selling, general, and administrative expenses are charged to operations as incurred. The asset "cost and estimated earnings in excess of billings on uncompleted contracts", represents revenues recognized in excess of amounts billed. The liability, "billings in excess of costs and estimated earnings on uncompleted contracts", represents billings in excess of revenues recognized. Depreciation Depreciation is provided for on the straight-line method over the eSTimated useful lives of the assets. Cash and cash equivalents For the purpose of reporting cash flows, the Company has defined cash equivalents as those highly liquid investments purchased with an original maturity of three months or less. 6 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 1 - SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - CONTINUED Income Taxes The Company uses the percentage-of-completion method of reporting income from long- term construction contracts for financial statements purposes and the completed contract method for income tax purposes. The Company has elected, with the consent of its stockholders, to be taxed as an S corporation under the provisions of Section 1362 of the Internal Revenue Code and state "laws. Under these provisions, the Company does not pay federal or state income taxes on its taxable income. Instead the stockholders are liable for individual income taxes on their respective share of the Company's income. Long-Lived Assets Long-lived assets, such as property and equipment, are reviewed on an ongoing basis for impairment based on comparison of carrying value against undiscounted future cash flows. If impairment is identified, the assets carrying amounts are adjusted to fair value. There were no such adjustments during the six months ended June 30, 2009 and 2008. NOTE 2 - CONTRACTS RECEIVABLE Contracts receivable are as follows: 2009 2008 Billed Completed contracts Due Contracts in progress Due Retainage $ 393,592 $ 479,137 3,887,684 3,083,342 $ 7,364,618 3,155,153 2,448,964 $ 6,083,254 Contracts receivable as of June 30, 2009 are aged as follows: 0- 30 days $ 2,243,128 31 - 60 days 920,461 61 - 90 days 317,477 Over 91 days 800,010 Retainage 3,083,342 $ 7,364,618 The Company collected approximately $ 3,400,000 of the receivables through September 21,2009. 7 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANC1AL STATEMENTS NOTE 3 - COSTS AND ESTIMATED EARNINGS ON UNCOMPLETED CONTRACTS Costs incurred on uncompleted contracts Estimated earnings 2009 $ 29,429,865 5,779,166 35,209,031 (39,686,133) $ (4,477,102) Less: billings to date Costs and estimated earnings in excess of billings on uncompleted contracts Billings in excess of costs and estimated earnings on uncompleted contracts $ (4,477,102) $ (4,477,102) NOTE4-BACKLOG 2008 $ 19,485,216 3,736,798 23,222,014 (26,019,877) $ (2,797,863) $ 115,913 (2,913,776) $ (2,797,863) The following is a reconciliation of backlog representing signed contracts in existence as of June 30: Balance at the beginning of the year Contracts and adjustments 2009 $ 53,937,241 (205,354) 53,731,887 (10,226,909) $ 43,504,978 Less: contract revenues earned for six months Balance at the end of the six months 2008 . $ 16,052,605 5,365,372 21,417,977 (7,260,004) $ 14,157,973 The Company assures that all contract cost pertaining to the financial statements for the six months ended June 30, 2009 have been included. NOTE 5 - CONCENTRATION OF CREDIT RISK The Company maintains its cash balances in a financial institution in Miami, Florida. The balances are insured by the Federal Deposit Insurance Corporation up to $100,000. Temporary additional protection of $150,000 has been extended by the FDIC through December 31, 2009. These balances may at times exceed insured limits. The Company as of June 30, 2009, had 98 % of their receivables with four customers. The Company as of June 30, 2008, had 82 % of their receivables with two customers. . 8 SOlJTHEASTERN ENGINEERlNG CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 6 - MAJOR CUSTOMERS The Company earned revenues during the six months ended June 30, 2009 from five customers that individually accounted for more than 10% of the total revenues earned during the six months. Revenues earned from these customers amounted to $ 2,626,813, $ 1,936,792, $ 1,801,049, $ 1,702,548 and $ 1,346,987. The Company earned revenues during the six months ended June 30, 2008 from three. customers that indivi~ua1ly accounted for more than 10% of the total revenues earned during the six months. Revenues earned from these customers amounted to $ 4,351,500, $ 1,497,513 and $ 946,756. NOTE 7 - PROPERTY AND EQUIPMENT Depreciation for the six months ended June 30, 2009 and 2008 was $ 108,147 and $ 129,599, respectively. Costs, accumulated depreciation and estimated useful lives as of June 30, are as follows: Estimated Category useful lives 2009 2008 Auto and trucks 5 Years $ 647,093 $ 495,146 Heavy equipment 7 Years 2,349,430 2,659,033 Furniture and fixtures 7 Years 57,371 57,371 Leasehold improvements 39 Years 44,621 44,621 3,098,515 3,256,171 Less: accumulated depreciation (2,221,711) (2,447,779) $ 876,804 $ 808,392 NOTE 8 - RELATED PARTY TRANSACTIONS The Company leases administrative offices, storage space and a parking facility from the Company's stockholders. The lease terms are on a month to month basis and rental payments made for the six months ended June 30, 2009 and 2008 were $ 128,244 and $ 65,453 respectively. The Company's stockholders have lent $ 200,000 to the Company under an unsecured note payable with a due date of July 15,2010. The Company and these related parties mentioned above are not considered variable interest entities under F ASB Interpretation 46R - Consolidation of Variable Interest Entities. Accordingly, the accompanying fmancial statements have not been consolidated with these related companies. . 9 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 9 - LONG-TERM DEBT The Company's long-term debt consists of the following: 2008 Equipment and vehicle loans payable in monthly installments ranging from $ 383 to $ 3,759 including interest at rates of2.90 % to 14.94 % and maturity dates from October 2009 to November 2013. $ 467,535 (181,435) $ 286,100 $ 334,111 (165,245) $ 168,866 Less: current portion Future principal payments of these notes will be as follows: Year Amount 2010 $ 181,435 2011 136,234 2012 97,793 2013 44,414 2014 7,659 $ 467,535 NOTE 10 - LINE OF CREDIT The Company has secured with assets held by the stockholders a line of credit of $ 1,500,000 bearing interest of prime rate minus .25 %, and maturing upon demand. As of June 30, 2009; there was zero balance due by the Company under the line of credit. NOTE 11 - ASSIGNMENT OF RIGHTS AND PROPERTY UNDER INDEMNITY AGREEMENT In order to procure a bonding line, the Company has assigned certain rights and property as collateral to secure its obligations under the indemnity agreement. These rights consist principally of rights under construction contracts, subcontracts, insurance policies and legal claims. The property assigned consists of all property and equipment, cash and accounts receivable. 10