HomeMy WebLinkAboutReso 2010-1620 RESOLUTION NO. 2010 - Ii:, "'lO A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING THE AWARD OF RFP NO. 10-08-01 TO AND ENTERING INTO AN AGREEMENT WITH SOUTHEASTERN ENGINEERING CONTRACTORS, INC. FOR THE CONSTRUCTION OF THE CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTSIDRAINAGE PROJECT PHASE IV, IN AN AMOUNT NOT TO EXCEED EIGHTY- FOUR THOUSAND SEVEN HUNDRED FORTY DOLLARS AND EIGHTY-ONE CENTS ($84,740.81), ATTACHED HERETO AS EXHIBIT "A", BASED ON THE PRICING, TERMS, AND CONDITIONS LISTED IN THE BID RESPONSE, ATTACHED HERETO AS ATTACHMENT "A"; AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City has continuously experienced problems with flooding in the Central Island area, and was in need of engineering services for drainage improvements in Central Island that will enhance the drainage on North Bay Road both at the Sunny Isles Beach Elementary School and south ofthe School; and WHEREAS, the City is now in need of a contractor to furnish all materials, equipment and labor for the Central Island Drainage Project Phase IV in the City of Sunny Isles Beach; and WHEREAS, the City issued and advertised Request for Proposals No. 10-08-0 I, for Professional Construction Services for Central Island Emergency Outfalls Improvements, for which three (3) responses were received; and WHEREAS, staff has determined that the bid response from Southeastern Engineering Contractors, Inc. attached hereto as Attachment "A", is the lowest most responsive responsible bid; and WHEREAS, Southeastern Engineering Contractors, Inc. has expressed its ability and desire to provide these services; and WHEREAS, the City wishes to award RFP No.1 0-08-0 I to and enter into an agreement with Southeastern Engineering Contractors, Inc. to provide services on a unit price basis for the Central Island Emergency Outfalls Improvements/Drainage Project Phase IV Phase IV, in an amount not to exceed Eighty-Four Thousand Seven Hundred Forty Dollars and Eighty-One Cents ($84,740.81), attached hereto as Exhibit "A". NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: R201O- Southeastern - Central Island Drainage Phase IV (RFP 10-08-0 I) Page 1 of 2 Section 1. Incorporation of Recitals. The recitals set forth in this resolution are incorporated herein by reference as if fully set forth herein. Section 2. Award of RFP and Approval of Agreement. The City Commission hereby awards RFP No.1 0-08-0 1 to and enters into an agreement with Southeastern Engineering Contractors, Inc. for the Central Island Emergency Outfalls Improvements/Drainage Project Phase IV, in an amount not to exceed Eighty-Four Thousand Seven Hundred Forty Dollars and Eighty-One Cents ($84,740.81), attached hereto as Exhibit "A", based on the pricing, terms, and conditions listed in the bid response, attached hereto as Attachment "A". Section 3. Authorization ofMavor. The Mayor is hereby authorized to execute said Agreement. Section 4. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 5. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 14th day of October 2010. 'J AT'fEST: ~~ Jane, A. Hines,.CMC, City Clerk I '},.' ,; j ," . .. ~.. Vote: ~-o Mayor Edelcup Vice Mayor Thaler Commissioner Brezin Commissioner Goodman Commissioner Scholl ---L- (Yes) ~(Y es) ~(Y es) t/ (Yes) V(Yes) Moved by: C.t>l'Io~ s: Co Ho\-L Seconded by: V \l.l rl\ 0' '\" \\'frl..'UL _(No) _(No) _(No) _(No) _(No) R201O- Southeastern - Central Island Drainage Phase IV (RFP 10-08-0 I) Page 2 of 2 Q, ,,," CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS CONTRACT THIS AGREEMENT is made and entered into this l!l~ay t)~c€.-- of 2010 by and between the City of Sunny Isles Beach (the "City") and Southeastern Engineering Contractors. Inc. a Florida Corporation (the Contractor"). WITNESSETH: WHEREAS, the City issued Request for Proposals No. 10-08-01 ("RFP") for Professional Construction Services for the Central Island Emergency Outfalls Improvements (the "Project"), and Contractor was selected as the lowest responsible, responsive proposer, whose proposal best served the interest of and represented the best value to the City in conformity with the criteria set forth in Section 62-8 of the City Code, to perform the professional construction services; and WHEREAS, the Contractor represents to the City that it possesses the requisite qualifications, expertise and licenses to perform the professional construction services; and WHEREAS, the City Commission has determined that it is in the City's best interests to enter into and approve this Agreement with the Contractor for the Project. NOW THEREFORE, in consideration of the foregoing, and the mutual covenants and compensation set forth herein, the City and Contractor agree as follows: ARTICLE 1. DEFINITIONS Agreement means this Agreement together with the Contract Documents. Bond(s) means the Payment Bond and the Performance Bond issued by a surety or sureties in accordance with the provisions of the Contract Documents. Commencement Date means the date on which Contractor commences construction of the Project, but in no event later than five (5) days after the City's issuance of a Notice to Proceed. Contract Amount means the total sum of monies which has been agreed to between the Contractor and the City as the total price for the construction of the Project and the performance of all services under this Agreement. Contract Documents means this Agreement, the Request for Proposals including any attachments thereto, any Addenda to the Request for Proposals, the Successful Contractor's response to the Request for Proposals, the exhibits attached to the Request for Proposals, as well as the documents specifically identified in Article 15 below. Contract Time means the time period defined in this Agreement for the Contractor to complete the Work. Contractor means the Successful Contractor selected by the City to provide all labor, materials, equipment and services to complete the Work described in the Contract Documents. Contractor Project Manager means the person designated by Contractor as its lead representative to the City. The Contractor Project Manager shall have the authority to obligate Exhibit "A" and bind the Contractor and to act on all matters on behalf of Contractor except for revisions to the Contract Documents and Change Orders. Construction Change Directive means a written directive to effect changes to the Work, prepared by and executed by the City. Construction Schedule means a critical path schedule or other construction schedule, as defined and required by this Agreement. Construction Work means all Work required by this Agreement for the construction of the Project. The Construction Work also referred to herein as the "Work". Cure means the action taken by the Contractor, promptly after receipt of written notice from the City of a breach of the Agreement, which shall be performed at no cost to the City, to repair, replace, correct, and/or remedy all material, equipment, or other elements of the Work or the Agreement affected by such breach, or to otherwise make good and eliminate such breach, including, without limitation, repairing, replacing or correcting any portion of the Work or the Project site disturbed in performing such cure. Cure Period means a period of thirty (30) days, after receipt of written notice to cure from the City, in which the Contractor is required to cure deficiencies in the Work or compliance with this Agreement or the Contract Documents. Drawings means the graphic and pictorial portions of the Work, which serve to show the design, location and dimensions of the Work to be performed, including, without limitation, all notes, schedules and legends on such Drawings. Field Directive means a written approval for the Contractor to proceed with Work requested by the City, which is minor in nature and should not involve additional cost. Final Completion means the date subsequent to the date of Substantial Completion at which time the Contractor has completed all the Work in accordance with the Agreement as certified by the City and submitted all documentation required by the Agreement. Final Completion shall be evidenced by the City's issuance of a Final Certificate for Payment. Insurance Requirements means the requirements described in .this Agreement and the Contract Documents. Notice To Proceed means a written letter or directive issued by the City directing that the Contractor may begin Work on the Project or a specific task of the Project. Project Manager means an employee or representative of the City assigned to manage and monitor the Work to be performed under this Agreement and the construction of the Project. Project means the construction and incidentals thereto, of the project entitled RFP 10-08-01 Professional Construction Services for Central Island Emergency Outfalls Improvements, as described in the Contract Documents. Project Location means the North Bay Road area between 180th Drive and 183rd Street in the City of Sunny Isles Beach. Punch List means a compilation of items of Construction Work required to be performed by, or through the Contractor after the Substantial Completion inspection and prior to Final Completion and payment. Request For Information (RFI) means a request from the Contractor seeking an interpretation or clarification by the City relative to the Agreement and/or the Contract Documents. The RFI, which shall be clearly marked RFI, shall clearly and concisely set forth the issue(s) or item(s) requiring clarification or interpret,ation and why the response is needed. The RFI must set forth 20 .. the Contractor's interpretation or understanding of the document(s) in question, along with the reason for such understanding. Schedule of Values means a written schedule setting forth the detailed and itemized cost breakdown, inclusive of labor, material, and taxes of all elements comprising the Work. Specifications and Plans as used herein means that portion of the Contract Documents which are the written requirements for the materials, equipment, systems, standards and workmanship for completion of the Work and performance of related services. Sub-Contractor(s) means a person or entity other than a materialman or laborer that has a direct contract with the Contractor to perform or supply any portion of the Work. Substantial Completion means that point at which the Work is at a level of completion in substantial compliance with the Agreement such that the City can use, occupy and/or operate the facility in all respects to its intended purpose. Substantial Completion shall be evidenced by the City's execution of a Certificate of Substantial Completion. Time for Completion means the date of Substantial Completion as specified in the Contract Documents. Work as used herein refers to all services required by the Contract Documents, including all labor, materials, equipment, supervision and services needed to complete the Project in accordance with the Contract Documents. ARTICLE 1. SCOPE OF WORK Contractor shall provide all labor, materials, equipment, tools, manpower, management, supervision, and all other necessary goods and services to perform the Work in the manner provided this Agreement and the Contract Documents. ARTICLE 2. CONTRACT TIME. TIME FOR COMPLETION AND LIQmDATED DAMAGES 2.1 Time is of the essence in the performance of the Work under this Agreement. The Commencement Date shall be no later than five (5) days after City's issuance of the Notice to Proceed. Contractor shall perform the Work in accordance with any applicable Construction Schedule(s), and shall achieve Substantial Completion of construction not later than 60 (sixty) days after issuance of a Notice to Proceed (hereinafter referred to as the "Time for Completion.") 2.2 Contractor shall complete all applications for any construction permit(s) within ten (10) calendar days after execution of this Agreement. A Notice to Proceed for the commencement of the Work will not be issued until Contractor's submission to the City of all required documents, including, but not limited to, the Bonds, the Insurance Certificate and the construction permit(s). In the event Contractor fails to deliver to the City the required documents within ten (10) days after the Execution Date, or fails to apply for the construction permit(s) within ten (10) days after the Execution Date, or fails to commence the Work within five (5) days after the City's Issuance of a Notice to Proceed, then Contractor shall be in default. In such event the City, in addition to all remedies provided for an event of Contractor's default hereunder, shall have the right to collect from Contractor all expenses incurred by the City in 21 .. the re-procurement of the Services. 2.3 Time is of the essence throughout this Agreement. 2.4 Upon failure of Contractor to achieve Substantial Completion of the Work by the Time for Completion, plus approved time extensions (if applicable), Contractor shall pay to the City the sum of five hundred dollars ($500.00) for each calendar day after the Time for Completion plus any approved time extensions (if applicable). These amounts are not penalties but are liquidated damages to the City for its inability to obtain beneficial occupancy and/or use of the Project. Liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by the City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Construction Work on time. 2.5 The City is authorized to deduct liquidated damages from monies due to Contractor for Work under this Agreement or as much thereof as the City may, in its sole discretion, deem just and reasonable. 2.6 Contractor will promptly perform its duties under the Contract Documents and will give the Work as much priority as is necessary to cause the Work to be completed on a timely basis in accordance with the Contract Documents. Time is of the essence of this Agreement. All Work shall be performed strictly (not substantially) within the time limitations necessary to' meet all deadlines established in the Construction Schedule and the Contract Documents. 2.7 All dates and periods of time set forth in the Construction Schedule, and the Contract Documents, including those for the commencement, prosecution, Interim milestones, milestones, and completion of the Work, and for the delivery and installation of materials and equipment, were included because of their importance to the City. 2.8 Contractor acknowledges and recognizes that (i) the City is entitled to full and beneficial occupancy and use of the completed Work following expiration of the Time for Completion, and (ii) the City will schedule the opening of the Project based upon the Contractor's achieving Substantial Completion of the Work on or before the Time for Completion. 2.9 Contractor agrees to the assessment of liquidated damages as provided in this Agreement. 2.10 Except for extensions approved in writing by the City, Excusable Delays, or as otherwise specifically provided in this Agreement, the Contractor understands that the occurrence of events of delay within the Contractor's control, shall not excuse the Contractor from its obligation to achieve Substantial completion of the Work within the time stipulated in this Agreement, and shall not entitle the Contractor to an adjustment of the Contract Amount. All parties under the control or contract with the Contractor shall include, but are not limited to, subcontractors, materialmen and/or laborers. 22 ;II ARTICLE 3. EXCUSABLE DELAY The Time for Completion may be extended by reason of an Excusable Delay. An Excusable Delay is delay caused by circumstances (i) beyond the control of Contractor, its Sub- Contractors, suppliers and vendors and (ii) not caused by the negligence of Contractor, its Sub- Contractors, suppliers and vendors. Where Contractor claims that it is entitled to an extension because of an excusable delay, it shall furnish to the Project Manager all documentation supporting its claim, including, details of the claim, a description of the work affected and the actual costs resulting from the delay. Failure of Contractor to comply with this Article as to any particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. ARTICLE 4. NO DAMAGE FOR DELAY In the event construction of the Project is delayed through no fault of Contractor or Owner, it is agreed that Contractor's sole and exclusive remedy is a time extension of the Time for Completion equal to each day the Work is so delayed. The City shall not be liable for any delay damages or damages in any way attributable to performing work out of sequence, acceleration claims, or other similar type claims, incurred by Contractor or any of its Sub-contractors, arising out of or in any way associated with the performance of this Contract. In the event Contractor is delayed in performance of the Work by act or omission of Owner, or Owner's Agents, employees, consultants or Separate Contractor's, Contractor shall be entitled to an equitable adjustment of the Time for Completion. ARTICLE 5. CONTRACT AMOUNT. PROGESS PAYMENTS AND FINAL PAYMENT 5.1 The City shall pay to the Contractor, for the faithful performance of this Contract, the Contract Amount in accordance with the provisions of Article 2 of this Agreement. Payment shall be made pursuant to approved applications for payment approved by the City. Payment shall be made within thirty (30) days after the City's receipt of Contractor's Application for Payment, approved by the City, and accompanied by sufficient supporting documentation, and containing sufficient detail, to allow a proper audit of expenditures, should the City require one to be performed. 5.2 Contractor may make Application for Payment for Construction Work completed during the Project at intervals of not more than once a month. Contractor's Application for Payment shall include partial release(s) of liens or consent of Surety relative to the portion of the Work, which is the subject of the Application for Payment and any other information required by the City. Each Application for Payment shall be submitted in triplicate to the City for approval. 5.3 Ten percent (10%) of all monies earned by Contractor shall be retained by the City until Final Completion, receipt of closeout documents, and acceptance by the City except that after fifty percent (50%) of the Work has been completed, the Contractor may request a reduction in the retain age to five percent (5%) of all monies previously earned and all monies 23 earned thereafter. Any reduction in retainage shall be in accordance with Section 255.078 Florida Statutes. Any interest earned on retainage shall accrue to the benefit of the City. All requests for retainage reduction shall be in writing in a separate stand alone document. 5.4 The City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 5.4.1 Defective Construction Work not remedied. 5.4.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or the City because of Contractor's performance. 5.4.3 Failure of Contractor to make payments properly to Sub-Contractors or for material or labor. 5.4.4 Liquidated damages and costs incurred by the City for extended construction administration. 5.4.5 Failure of Contractor to comply with other provisions of this Agreement. 5.5 Upon receipt of written notice from Contractor that the Work is ready for final inspection and acceptance, the City or its designee shall, within ten (10) calendar days, make an inspection thereof. If the City or its designee finds the Work acceptable, the requisite documents have been submitted and the requirements of the Contract Documents fully satisfied, and all conditions of the permits and regulatory agencies have been met, a Final Certificate for Payment shall be issued by the City or its designee, stating that the requirements of the Contract Documents have been performed and the Work is ready for acceptance under the terms and conditions thereof. 5.6 Before issuance of the Final Certificate for Payment, Contractor shall deliver to the City or its designee a complete release of all liens arising out of this Agreement, or receipts in full in lieu thereof, an affidavit certifying that all suppliers and Sub-Contractors have been paid in full and that all other indebtedness connected with the Construction Work has been paid, and a consent of the surety to final payment; the final corrected As-Built Drawings; the Record Set; and the final bill of materials, if required, and Application for Payment. Contractor shall deliver the written Contractor's and all Manufacturers warranties prior to issuance of the Final Certificate for Payment. 5.7 If, after the Construction Work has been substantially completed, full completion thereof is materially delayed through no fault of Contractor, and the City or its designee so certifies, the City shall, upon certificate of its designee, and without terminating the Agreement, make payment of the balance due for that portion of the Construction Work fully completed and accepted. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of claims. 5.8 Final payment shall be made only after the City or designee has reviewed a written evaluation of the performance of Contractor prepared by the City or its designee, and approved the final payment. The acceptance of final payment shall constitute a waiver of all claims by 24 " Contractor, except those previously made in strict accordance with the provIsions of the Agreement and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 6. REOUESTS FOR INFORMATION (RFI) The Contractor shall submit in writing a Request for Information (RFI) to the City or its designee, where the Contractor believes that the specifications or drawings are unclear or conflict. All requests must be submitted in a manner that clearly identifies the drawing and/or specification section where clarification or interpretation is being requested. ARTICLE 7. FIELD DIRECTIVES The City or its designee may at times issue Field Directives to the Contractor based on visits to the Project site. Such Field Directives shall be issued in writing and the Contractor shall be required to comply with such directive. Where the Contractor believes that the directive is outside the scope of the Work, the Contractor shall, within 48 hours, notify the City or its designee that the Field Directive is outside the scope of the Work. At that time the Field Directive may be rescinded or the Contractor may be required to submit a request for a Change Order proposal. Where the Contractor is notified of the position that the Field Directive is within the scope and the Contractor disagrees, the Contractor shall notify the City or its designee that the Contractor reserves the right to make a claim for the time and monies based on the Field Directive. At no time shall the Contractor refuse to comply with the directive. Failure to comply with the directive may result In a determination that the Contractor is in default of the Agreement. ARTICLE 8. CHANGE ORDERS 8.1 Changes in the quantity or character of the Construction Work of the Project which are not properly the subject of Field Directives shall be authorized only by Change Orders approved in advance and issued in accordance with the provisions of the City. 8.2 All changes to the Work or the construction Schedule must be pre-approved in writing by the City in accordance with the value of the Change Order or the calculated value of the time extension. All Change Orders, increasing the contract amount by $50,000.00 (fifty thousand dollars) or more must be pre-approved in writing by the City. 8.3 In the event satisfactory adjustment cannot be reached for any item requiring a change in the Contract Amount, the City reserves the right at its sole option to either terminate the Agreement as it applies to the items in question and make such arrangements as may be deemed necessary to complete the disputed work; or may submit the matter in dispute as set forth in the dispute resolution procedures set forth in this Agreement. 8.4 On approval of any change increasing the Contract amount, Contractor shall ensure that the Bonds are increased accordingly. 25 -- ARTICLE 9. SCOPE OF WORK MODIFICATION PROCEDURES 9.1 OWNER INITIATED MODIFICATIONS The City or its designee will issue a detailed description of proposed changes in the Work that may require an adjustment(s) to the Contract Amount or Contract Time. If necessary, the description will include supplemental or revised drawings and specifications. Subsequent to notification of modifications in the Work by City or its designee, Contractor shall submit a quotation estimating cost adjustments to the Contract Amount and/or the Contract Time necessary to execute the change. Contractor shall include the following information when responding: . Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. . Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. . Include costs of labor and supervision directly attributable to the change. . Include an updated contractor's construction schedule that indicates the effect of the change, including but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float, if any, before requesting an extension of the Contract Time. 9.2 CONTRACTOR INITIATED MODIFICATIONS If latent or unforeseen conditions require modifications in the contract, the Contractor may propose changes by submitting a request for a change to the City or its designee. Contractor shall use form AlA Document G709 for said modification requests. The following MUST be submitted/included by Contractor: . A statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Amount and the Contract Time. . A list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. · Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. . Cost of labor and supervision directly attributable to the change, · Updated contractor's Construction Schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start to finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time. · Comply with any applicable product requirements if the proposed change requires substitution of one product or system for product or system specified. 26 9.3 ALLOW ANCES Allowance Adjustment. To adjust allowance amounts, Contractor shall base each Change Order proposal on the difference between purchase amount and the allowance, multiplied by final measurement of work-in-place. If applicable, Contractor shall also include reasonable allowances for cutting losses, tolerances, mixing wastes, normal product imperfections, and similar margins. Contractor also agrees to the following conditions: . Include installation costs in purchase amount only where indicated as part of the allowance. · If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed. . Submit substantiation of a change in scope of work, if any, claimed in change orders related to unit-cost allowances. . The City reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count. Contractor must submit claims for increased costs because of a change in scope or nature of the allowance described in the contract documents, whether for the purchase order amount or contractor's handling, labor, installation, overhead, and profit. Contractor shall submit claims within fourteen (14) days of receipt of the change order or construction change directive authorizing work to proceed. The City or its designee will reject claims submitted later than fourteen (14) days after such authorization. Contractor also agrees to the following conditions: · Do not include Contractor's or subcontractor's indirect expense in the change order cost unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the contract documents. · No change to Contractor's indirect expense is permitted for selection of higher or lower priced materials or systems of the same scope and nature as originally indicated. 9.4 CHANGE ORDER PROCEDURES On the City's approval of a proposal request, the City or its designee will issue a change order for signatures of the City and the contractor on AlA Document G701. 9.5 CONSTRUCTION CHANGE DIRECTIVE Construction Change Directive. The City or its designee may issue a construction change directive on AlA Document G714. Construction change directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a change order. Construction change directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Amount or the Contract Time. Documentation. Contractor agrees to maintain detailed records on a time and material basis of work required by the construction change directive. After completion of change directive, 27 . Contractor shall submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the contract. ARTICLE 10. SUBSTANTIAL COMPLETION. PUNCH LIST & FINAL COMPLETION 10.1 The Work shall be substantially complete when the City or its designee, in the reasonable exercise of their discretion, determines that the Work is complete, that there are no material and/or substantial variations from the Agreement, and the Work is fit for its intended purpose. Upon Substantial Completion, the City will prepare a Certificate of Substantial Completion. The signing of this form shall not relieve the Contractor from its obligation to complete the Project. 10.2 When the Contractor believes that the Construction Work is substantially complete, the Contractor shall request in writing that the City or its designee inspect the Construction Work to determine if Substantial Completion has been achieved. No request for Substantial Completion inspection is to be submitted until the Contractor has obtained a Certificate(s) of Occupancy, Certificate of Completion or a Temporary Certificate of Occupancy unless the failure to obtain such certificate(s) is beyond the Contractor's control. The City of its designee shall schedule the date and time for any inspection and notify the Contractor and any other parties deemed necessary. During this inspection, the City or its designee and the Contractor shall sign a Substantial Completion Inspection certificate, any remaining Work shall be identified on the Punch list form, which work shall be known as Punch List work. The Punch List shall be signed by the City or its designee and the Contractor to confirm that the Punch List contains the item(s) necessary to complete the Construction Work. The failure or refusal of the Contractor to sign the Substantial Completion Inspection form or the Punch List, or the failure to include any items of corrective work on such Punch List, do not alter the responsibility of Contractor to complete all of the Work in accordance with the Contract Documents. 10.3 Where the Punch List is limited to minor omissions and defects, the City or its designee shall indicate that the Construction Work is substantially complete subject to completion of the Punch List. Where the City or its designee determines that the Work is not substantially complete, the City or its designee shall provide a list of all open items necessary to achieve Substantial Completion. Upon completion of such Work, the Contractor shall request another Substantial Completion inspection. 10.4 The City or its designee, and the Contractor shall agree on the time reasonably required to complete all remaining Work included in the Punch List. 10.5 Upon the receipt of all documentation, resolution of any outstanding issues and completion of the Punch List items, the City or its designee shall issue a Final Certificate for Payment. Upon issuance of the final payment, the City or its designee shall notify the Contractor in writing of the closeout of the Project. 10.6 Warranties required by the Contract Documents shall commence on the date of Substantial Completion of the Work or designated portion thereof unless otherwise provided in the Certificate of Substantial Completion. 28 ... .. ARTICLE 11. WARRANTY OF CONSTRUCTION The Contractor shall warrant that the Work conforms to the Agreement and is free of any patent and/or latent defect of the workmanship for a minimum period of one year from the date of Final Completion. This warranty shall be in addition to whatever rights the City may have under law. The Contractor's obligation under this warranty shall be at its own cost and expense, to promptly repair or replace (including cost of removal and installation), that item (or part or component thereof) which proves defective or fails to comply with the Agreement within the warranty period such that it complies with the Agreement. ARTICLE 12. AS-BUILT DRAWINGS During the Construction Work, Contractor shall maintain records of all deviations from the Drawings and Specifications as approved by the City or its designee and furnish such information as is required for the City or its designee to prepare As-Built Record Drawings showing correctly and accurately all changes and deviations made during construction to reflect the work as it was actually constructed. ARTICLE 13. CLEANING UP - THE CITY'S RIGHT TO CLEAN UP Contractor shall at all times keep the premises free from accumulation of waste materials or rubbish caused by its operations. At the completion of the Project, Contractor shall remove all its waste materials and rubbish from and about the Project as well as its tools, construction equipment, machinery and surplus materials. If Contractor fails to clean up during the prosecution of the Work or at the completion of the Construction Work, the City may do so and the cost thereof shall be charged to Contractor. Cleaning operations should be controlled to limit dust and other particles adhering to existing surfaces. ARTICLE 14. REMOVAL OF EOUIPMENT In case of termination of this Agreement before completion for any cause whatsoever, Contractor, if notified to do so by the City or its designee, shall promptly remove any part or all of Contractor's equipment and supplies from the property of the City. If the Contractor fails to comply with the City's order, the City shall have the right to remove such equipment and supplies at the expense of Contractor. ARTICLE 15. CONTRACT DOCUMENTS The Contract Documents shall consist of this Agreement, the Exhibits, the Request for Proposals No. 10-08-01, the Successful Contractor's Response to the Request for Proposals No. 10-08-01, the Bid Bond, the Payment and Performance Bond, the DERM approved Drawings prepared by Beiswenger, Hoch and Associates, Inc. any Addenda to Request for Proposals No. 10-08- 01, Contractor's Schedule of Value, approved written interpretations and clarifications, Field 29 ~ Directives, Construction Change Directives, any Change Orders issued thereto, and any modifications. duly issued after execution of the Agreement. Any modification to this Agreement shall only be effective if it is reduced to writing, and duly executed by both parties, except a Field Directive or Constructive Change Directive shall be effective after approval and execution by the City. The general intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Project by the Contractor. ARTICLE 16. SITE INVESTIGATION AND REPRESENTATION 16.1 The Contractor acknowledges that it has satisfied itself as to the nature and location of the Work, the general and local conditions, particularly those bearing upon availability of transportation, disposal, handling and storage of materials, availability of labor, water, electric power, and roads, the conformation and conditions at the ground and all other matters which can in any way affect the Work or the Contract Amount. 16.2 The Contractor further acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials to be encountered from evaluating information included in the Contract Documents. Any failure by the Contractor to acquaint itself with all the provided information will not relieve Contractor from responsibility for properly estimating the difficulty or cost thereof under the Contract Documents. ARTICLE 17. OWNERSHIP AND USE OF DOCUMENTS The Drawings, Specifications and other documents prepared by the City or its designee, and copies thereof furnished to the Contractor, are for use solely with respect to this Agreement. They are not to be used by the Contractor, Sub-Contractors, and/or material suppliers on other projects, without the specific express written consent of the City. The Contractor, Sub-Contractors, and/or material suppliers are granted only a limited license to use and reproduce applicable portions of the Drawings. Specifications, and other documents prepared by the City or its designee, appropriate to and for use in the execution of their Work under this Agreement. ARTICLE 18. PLANS. SPECIFICATIONS AND WORKING DRAWINGS 18.1 The City or its designee shall have the right to modify the details of the Plans, Specifications, and Working Drawings with additional plans, drawings or additional information as the Work proceeds, all of which shall be considered as part of the Contract Documents. 18.2 Where the Contractor believes that the modification or supplement is outside the Scope of the Work, the Contractor shall, within 72 hours, notify the City or its designee that the modification or supplement is outside the scope of the Work. At that time the modification or supplement may be rescinded or the Contractor may be required to submit a request for a Change Order proposal. Where the Contractor is notified of the City's position that the modification or supplement is within the scope and the Contractor disagrees, the Contractor shall notify the City or its designee that the Contractor reserves the right to make a claim for the time and monies based on the modification or supplement. At no time shall the Contractor refuse to comply with the modification or supplement. 30 ]" 18.3 When, in the opinion of the City or its designee, it becomes necessary to explain the Work to be done more fully, or to illustrate the Work further, or to show any changes which may be required, supplementary drawings, with specifications pertaining thereto, will be prepared by the City or its Designee. The supplementary drawings shall be binding upon Contractor with the same force as the Contract Documents. Where such supplementary drawings require either less or more than the original quantities of work, appropriate adjustments shall be made by Change Order. 18.4 The City or its designee, as applicable, shall have the right to approve and issue Supplemental Instructions setting forth written orders, instructions, or interpretations concerning the Contract Documents or its performance. ARTICLE 19. CONTINUING THE WORK Contractor shall carryon the Work and adhere to the progress schedule during all disputes or disagreements with the City, including, without limitation, disputes or disagreements concerning a request for a Change Order, the Contract Amount, the Contract Time, or Time for Completion. The Work shall not be delayed or postponed pending resolution of any disputes or disagreements. All disputes shall be resolved in accordance with Article 37 pertaining to Mediation and Arbitration of Disputes. ARTICLE 20. AUTHORITY OF THE CITY AND ITS DESIGNEE 20.1 The City or its designee shall determine or answer, all questions of any nature whatsoever arising out of, under or in connection with, or in any way relating to or on account of the Work, and/or as to the interpretation of the Work to be performed. 20.2 The Contractor shall be bound by all determinations or orders of the City or its Designee and shall promptly respond to requests of the City or its Designee, including the withdrawal or modification of any previous order, and regardless of whether the Contractor agrees with the City's or its designee's determination or requests. 20.3 The City's designee shall have authority to act on behalf of the City to the extent provided by the Agreement, unless otherwise modified in writing by the City. All instructions to the Contractor shall be issued in writing. All instructions to the Contractor shall be issued through the City or its designee. 20.4 The City or its designee shall have access to the Project Site during normal work hours, unless access is required by the City due to health, safety or welfare of the City or the public. The Contractor shall provide safe facilities for such access so the City or it designee may perform their functions under the Agreement. The City or its designee will make periodic visits to the Work Site to become generally familiar with the progress and quality of the Work, and to determine if the Work is proceeding in accordance with the Contract Documents. 20.5 The City or its designee will not be responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions and programs in connection 31 .... with the Work, and will not be responsible for the Contractor's failure to carry out the Construction Work in accordance with the Agreement. 20.6 The City or its designee will have authority to reject Work that does not conform to the Contract Documents requirements. Whenever, in his or her opinion, it is considered necessary or advisable to ensure the proper implementation of the Contract Documents, the City or its designee will have authority to require special inspections or testing of the Construction Work, whether or not such Construction Work is fabricated, installed or completed. Neither the City's and/or its designee's authority to act under this Article, nor any decision made by himlher in good faith either to exercise or not to exercise such authority, shall give rise to any duty or responsibility of the City or its designee to the Contractor, any Sub-Contractor, supplier or any of their agents, employees, or any other person performing any of the Construction Work. 20.7 The City or its designee will not be responsible for the acts or omissions of the Contractor, or anyone employed or contracted directly or indirectly by the Contractor including any Sub-Contractor, or any of their agents or employees, or any other persons performing any of the Work. ARTICLE 21. DEFECTIVE WORK 21.1 The City or its designee shall have the authority to reject or disapprove Work which is found to be defective. If defective work is found, Contractor shall promptly either correct all defective work or remove such defective Work and replace it with non-defective Work. Contractor shall bear all direct and indirect costs of such removal or corrections including cost of testing laboratories and personnel. 21.2 Should Contractor fail or refuse to remove or correct any defective Work or to make any necessary repairs in accordance with the requirements of the Contract Documents within the time indicated in writing by the City or its designee, the City shall have the authority to cause the defective work to be removed or corrected, or make such repairs as may be necessary at Contractor's expense. Any expense incurred by the City in making such removals, corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor, or may be charged against the Payment and Performance Bond. In the event of failure of Contractor to make all necessary repairs promptly and fully, which is not cured in the Cure Period, the City may declare Contractor in default. 21.3 If, within one (1) year after the date of Substantial Completion or such longer period of time as may be prescribed by the terms of any applicable special warranty required by the Contract Documents, or by any specific provision(s) of the Contract Documents, any of the Construction Work is found to be defective or not in accordance with the Contract Documents, Contractor, after receipt of written notice from the City or its designee, shall promptly correct such defective or nonconforming Construction Work within the time specified by the City without cost to the City. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents including but not limited to any claim regarding latent defects. 32 21.4 Failure to reject any defective work or material shall not in any way prevent later rejection when such defect is discovered, or obligate the City to final acceptance. ARTICLE 22. CORRECTION OF WORK Where the City or its designee becomes aware of faults, defects or non-conformity in any of the Work provided under this Agreement or with the Work being performed by the Contractor, the City or its designee shall issue a Notice to Cure to the Contractor for correction. In no event shall the failure of the City or its designce to bring to the attention of the Contractor of such faults act as a waiver or release the Contractor from responsibility or liability for such fault, defect or non- conforming Work. ARTICLE 23. WARRANTY OF MATERIALS AND EOUIPMENT 23.1 Contractor warrants to the City that all materials and equipment furnished under this Agreement will be new unless otherwise specified and that all of the Work will be of good quality, free from faults and defects and in conformance with the Contract Documents. All equipment and materials not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by City or its designee, Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by any other provisions within the Contract Documents. 23.2 Contractor shall provide to the City or its designee all manufacturers' warranties. All warranties, expressed and/or implied, shall be given to the City for all material and equipment covered by this Agreement. All material and equipment furnished shall be fully guaranteed by the Contractor against factory defects and workmanship. At no expense to the City, the Contractor shall correct any and all apparent and latent defects that are required by Florida law. The Contract Documents may supersede the manufacturer's standard warranty, ARTICLE 24. CHANGES IN THE WORK OR TERMS OF CONTRACT DOCUMENTS 24.1 Without invalidating the Agreemcnt and without notice to any Surety, the City reserves and shall have the right, from time to time to make such increases, decreases or other changes in the character or quantity of the Work as may be considered necessary or desirable to complete fully and acceptably the proposed construction in a satisfactory manner. Any extra or additional work within the scope of this Project must be issued in writing in accordance with the requirements of this Agrecment. 24.2 Any changes to the terms of the Contract Documents must bc contained in a written document, executed by the parties hereto, with the same formality and of equal dignity prior to the initiation of any Work reflecting such change. This Article shall not prohibit the issuance of Change Orders executed only by the City or its designee as hereinafter provided. 24.3 Contractor shall increase or decrease the value of the Performance and Paymcnt Bonds to reflect the Contract Amount, as it may be revised. 33 ARTICLE 25. OSHA COMPLIANCE AND SAFETY PRECAUTIONS 25.1 The Contractor warrants that it will comply with all safety precautions as required by federal, state or local laws, rules, regulations and ordinances 25.2 Contractor warrants that it will adhere to the applicable environmental protection guidelines for the duration of the Project. If hazardous waste materials are used, detected or generated at any time, the City or its designee must be immediately notified of each and every occurrence. The Contractor shall comply with all codes, ordinances, rules, orders and other legal requirements of public authorities (including, without limitation, OSHA, EP A, DERM, the City of Sunny Isles Beach, Miami-Dade County, State of Florida, and Florida Building Code) which bear on the performance of the Work. 25.3 If an emergency condition should develop during the Project, the Contractor must immediately notify the City or its designee of each and every occurrence. The Contractor should also recommend any appropriate course(s) of action to the City or its designee. ARTICLE 26. PRIORITY OF PROVISIONS 26.1 If there is a conflict or inconsistency between any term, statement requirement, or provision of any Exhibit or Attachment hereto, any document or events referred to herein, or any document incorporated into this Agreement by reference and a term, statement, requirement, the specifications and plans, or provision of this Agreement the following order of precedence shall apply: 26.2 In the event of conflicts in the Contract Documents the priorities stated below shall govern. · Revisions to the Contract Documents shall govern over the Contract Documents · No section of the Scope of Work, specifications or plans shall govern over the Contract Terms and Conditions · Scope of Work and Specifications shall govern over plans and drawings 26.3 In the event of conflicts with the plans the priorities stated below shall govern: · Schedules, when identified as such shall govern over all other portions of the plans · Specific notes shall govern over all other notes, and all other portions of the plans, unless specifically stated otherwise · Larger scale drawings shall govern over smaller scale drawings · Figured or numerical dimensions shall govern over dimensions obtained by scaling · Where provisions of codes, manufacturer's specifications or industry standards are in conflict, the more restrictive or higher quality shall govern 26.4 In the event omissions in the Contract Documents are not complete as to any incidental detail of construction or construction system or with regard to the manner of combining or installing equipment, parts, or materials, such detail shall be deemed to be an 34 implied requirement of the Contract Documents. "Minor Detail" shall include the concept of substantially identical components, where the price of each such component is small. The quality and quantity of the equipment, material, or part so furnished shall conform to trade standards and be compatible with the type, composition, strength, size and profile of the equipment, materials or parts otherwise specified in the Contract Documents. ARTICLE 27. NOTICES Whenever either party desires to give written notice to the other, such must be addressed to the party for whom it is intended at the place last specified; and the place for giving of notice shall remain such until it shall have been changed by written notice given in accordance with the provisions of this Article. Notice shall be deemed given on the date received or within 3 days of mailing, if mailed through the United States Postal Service. Notice shall be deemed given on the date sent via e-mail or facsimile. Notice shall be deemed given via courier/delivery service upon the initial delivery date by the courier/delivery service. For the present, the parties designate the following as the respective places for giving of notice: To Contractor: Eduardo Dominguez, PE, GC Southeastern Engineering Contractors, Inc. 12054 NW 98th Avenue Hialeah Gardens, FL 33018 To City : City Manager and City Attorney City of Sunny Isles Beach 18070 Collins Avenue Fourth Floor Sunny Isles Beach, FL 33160 ARTICLE 28. INDEMNIFICATION 28.1 Contractor shall indemnify, defend and hold harmless the City, its officers, agents, directors, and employees, from any and all claims, liabilities, damages, losses, and costs, including, but not limited to reasonable attorney's fees, and costs to the extent caused by the negligence, recklessness or intentional wrongful misconduct of Contractor and/or persons employed or utilized by Contractor in the performance of this Agreement. Contractor's obligations hereunder shall apply even if part of the damage or injury is caused by the City, its officers, agents, directors, or employees. These indemnifications shall survive the term of this Agreement. In the event that any action or proceeding is brought against the City by reason of 35 any such claim or demand, Contractor shall, upon written notice from the City or its designee, resist and defend such action or proceeding by counsel satisfactory to the City. 28.2 The indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at City's option, any and all claims of liability and all suits and actions of every name and description covered by this Article, which may be brought against the City whether performed by Contractor, or persons employed or utilized by Contractor. 28.3 This indemnity will survive the cancellation or expiration of this Agreement. This indemnity will be interpreted under and construed to conform to the laws of the State of Florida. 28.4 Contractor shall require all Sub-Contractor agreements to include a provision that they will indemnify the City. ARTICLE 29. INSURANCE REQUIREMENTS 29.1 Contractor shall not start Work under this Agreement until it has delivered to the City or its designee certificates of insurance clearly indicating that the Contractor is in compliance with the Insurance Requirements required under the Contract Documents. 29.2 Contractor shall maintain coverage with equal or better rating as required herein for the term of this Agreement. Contractor shall provide written notice to the City Manager or its designee of any material change, cancellation and/or notice of non-renewal of the insurance at least 30 (thirty) days prior to the anticipated change or event. Contractor shall furnish a copy of the insurance policy or policies upon request of the City or its designee. 29.3 Contractor shall furnish copies of insurance policies pertaining to this Agreement to the City or its designee within ten (10) days of written request. If the initial insurance expires prior to the completion of the Work, renewal copies of policies shall be furnished at least thirty (30) days prior to the date of their expiration. 29.4 The City or its designee reserves the right to require modifications, increases. or changes in the Insurance Requirements, and shall provide a thirty (30) day written notice thereof to the Contractor. ARTICLE 30. PAYMENT AND PERFORMANCE BOND 30.1 Contractor shall not start Work under this Agreement until it has delivered to the City or its designee a Performance Bond and a Payment Bond in accordance with the requirements of the Contract Documents. 30.2 Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time, Contractor shall ensure that the Bond(s) are recorded in the public records of Miami-Dade County and provide the City or its designee with evidence of such recording. 36 ARTICLE 31. THE CITY'S RIGHT TO TERMINATE 31.1 The City has the right to terminate this Agreement for any reason or no reason, upon ten (10) days prior written notice to the Contractor stating the date upon which Contractor shall cease all Work under this Agreement and vacate the Project Site. Upon termination of this Agreement, all charts, sketches, studies, drawings, reports and other documents, including electronic documents, related to Work authorized under this Agreement, whether finished or not, must be turned over to the City. The Contractor shall be paid in accordance with provisions of this Agreement, provided that said documentation is turned over to the City or its designee within twenty (20) business days of termination. Failure to timely deliver the documentation shall be cause to withhold any payments due without recourse by Contractor until all documentation is delivered to the City. 31.2 If Contractor fails to comply with any term or condition of this Agreement, or fails to perform any of its obligations hereunder, then Contractor shall be in default. Upon the occurrence of a default which is not cured within the Cure Period, in addition to all remedies available to it by law, the City or its designee may immediately, upon written notice to Contractor, terminate this Agreement whereupon all payments, advances, or other compensation paid by the City to Contractor while Contractor was in default shall be immediately returned to the City. The City or its designee may also suspend any payment or part thereof or order a Work stoppage until such time as the issues concerning compliance are resolved. Contractor understands and agrees that termination of this Agreement under this Article shall not release Contractor from any obligation accruing prior to the effective date of termination. 31.3 In the event of termination due to default, in addition to the foregoing Contractor shall be liable for all costs and expenses incurred by the City in the re-procurement of the Work under this Agreement. In the event of Default, the City or its designee may also issue a Notice to Cure and suspend or withhold payments to Contractor until such time as the actions giving rise to default have been cured. 31.4 A finding of default and subsequent termination for cause may include, without limitation, any of the following: 31.4.1 Contractor fails to obtain and deliver to the City or its designee the Insurance certificates, the Bonds, and the Permits in the manner and within the time herein required. 31.4.2 Contractor fails to comply with any of its duties under this Agreement, with any terms or conditions set forth in this Agreement beyond the specified period allowed to cure such default. 31.4.3 Contractor fails to commence the Work within the timeframes provided or contemplated herein, or fails to complete the Work in a timely manner as required by this Agreement. 31.5 Except as otherwise provided for in this Agreement, the City or its designee shall provide Written Notice to Cure to Contractor as to a finding of default, and Contractor shall take all necessary action to Cure said default within the Cure Period. The City or its 37 - designee may extend the Cure Period at its sole discretion or terminate the Agreement upon failure of the Contractor to cure such default in the specified timeframe. ARTICLE 32. CONTRACTOR'S RIGHT TO TERMINATE 32.1 Subject to the provisions of Section 32.2 below, the Contractor may terminate this Agreement if the Work is stopped for any of the reasons listed below for a period of 60 days through no act or fault of the Contractor, his agents, employees, or other persons performing any portion of the Work for the Contractor, or for the reason listed in section 32.1.3 below. 32.1.1 Issuance of an Order of the Court or other Public Authority having jurisdiction; 32.1.2 An act of government which results in a cession of Work on this Agreement; 32.1.3 Failure of the City to pay the Contractor any properly presented and authorized payment within 30 days after approval and subsequent to an additional 30 days after notification from the Contractor in writing of such failure. 32.2 Contractor shall provide written notice of its intent to terminate to the City and the City shall have the right to cure the event giving rise to the right of termination within thirty (30) days after receipt of Contractor's notice. The Contractor may extend the City's cure period at its sole discretion or terminate the Agreement upon failure of the City to cure such event in the specified timeframe. In such event the Contractor shall be entitled to recover from the City any costs for work performed in accordance with the Agreement for which payment has not been made. Contractor agrees that this is its exclusive remedy for the City's default or for the occurrence of an event of termination and that the City shall not be liable to Contractor for any consequential or special damages. ARTICLE 33. UNDISCLOSED LOBBYIST OR AGENT - TERMINATION Contractor warrants that it has not employed or retained any company or person to solicit or secure this Agreement and that it has not paid or agreed to pay any person, company, corporation, individual, or firm any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Agreement. The City or its designee shall have the right to terminate this Agreement, without giving Contractor the opportunity to Cure, in the event of a breach of this provision. ARTICLE 34. PUBLIC ENTITY CRIMES In accordance with the Public Entity Crimes Act, Section 287.133, Florida Statutes, a person or affiliate who is a contractor, consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City, may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a contractor, supplier, subcontractor, or sub-consultant under a contract with the City, and may not transact any business with the City in excess of certain amounts provided in Section 287.017, Florida 38 Statutes. Violation of this section by Contractor shall result in termination of this Agreement and may result in Contractor's debarment. ARTICLE 35. MATERIALITY AND WAIVER OF BREACH 35.1 The City and Contractor agree that each requirement, duty, and obligation set forth in these Contract Documents is substantial and important to the formation of this Agreement. 35.2 The City's or its designee's failure to enforce any provision of this Agreement shall not be deemed a waiver of such provision or modification of this Agreement. A waiver of any breach of a provision of this Agreement shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Agreement. ARTICLE 36. FORCE MAJEURE Should any party fail to perform its obligations under this Agreement due to a condition of force majeure, as that term is interpreted under Florida law, and specifically including but not limited to Acts of God, Hurricanes, Tropical Storms, fire, flood, earthquakes and the unavailability of materials, equipment or labor resulting from said events, then the time for performance of said obligation hereunder will be extended by a period reasonably commensurate with the cause of such failure to perform or cure. If the Contractor is delayed in performing any obligation under this Agreement due to a force majeure condition, the Contractor shall request a time extension from the City within three (3) working days of said force majeure occurrence. Any time extension shall be subject to mutual agreement and shall not be cause for any claim by the Contractor for extra compensation unless additional services are required. Events of Force Majeure do not include acts or omissions of Sub- Contractors. ARTICLE 37. MEDIATION AND ARBITRATION OF DISPUTES The merits of any dispute arising under, out of, in connection with, or in relation to this agreement, or the making or validity thereof, or its interpretation, or any breach thereof, shall be determined and settled by Arbitration before an Arbitrator in the State of Florida, pursuant to the Commercial Arbitration Rules then obtaining of the American Arbitration Association. If the parties hereto are unable to agree upon the selection of an arbitrator, such arbitration shall be held before the American Arbitration Association. Any award rendered shall be final and conclusive upon the parties hereto and a judgment thereon may be entered in the highest court of the State of Florida having jurisdiction. Before submitting a dispute to Arbitration, the parties shall first attempt to resolve the dispute amicably. In the event that the parties hereto are unable to resolve the dispute amicably, either party may give notice for a Mediation session before a Mediator appointed by mutual agreement (hereinafter the "Mediator"). If the parties are unable to agree upon the selection of a mediator, such mediation shall be held before the American Arbitration Association. The 39 ~,,- . Mediator shall make a recommendation to the parties in the form of a written mediated settlement agreement. Each party to the dispute shall sign such agreement after receipt of the same or immediately file a demand for Arbitration, in which event the parties shall proceed to Arbitration in accordance with the previous paragraph. All costs of the Arbitration, including Mediation and the legal action to confirm and enforce the arbitrator's award, as the case may be, including the reasonable legal fees of both parties shall be paid by the non-prevailing party, or, if neither party prevails on the whole, each party shall be responsible for a portion of the costs of Arbitration and Mediation as may be determined by the court on confirmation. ARTICLE 38. APPLICABLE LAW AND VENUE OF LITIGATION This Agreement shall be interpreted and construed in accordance with and governed by the laws of the State of Florida. Any suit or action brought by any party, concerning this Agreement, or arising out of this Agreement, shall be brought in Miami-Dade County, Florida. Each party shall bear its own attorney's fees except in actions arising out of Contractor's duties to indemnify the City under this Agreement where Contractor shall pay the City's reasonable attorney's fees. ARTICLE 39. PERMITS AND LICENSES ("PERMITS") Except as otherwise provided within the Agreement, all permits and licenses required by federal, state or local laws, rules and regulations necessary for the prosecution of the Work undertaken by Contractor pursuant to this Agreement shall be secured and paid for by Contractor. It is Contractor's responsibility to have and maintain appropriate Certificate(s) of Competency, valid for the Work to be performed and valid for the jurisdiction in which the Work is to be performed for all persons working on the Project for whom a Certificate of Competency is required. ARTICLE 40. AUDIT RIGHTS 40.1 Contractor's records which shall include but not be limited to accounting records, payroll time sheets, cancelled payroll checks, W-2's, 1099's, written policies and procedures, computer records, disks and software, videos, photographs, subcontract files, originals estimates, estimating worksheets, correspondence, change order files (including documentation covering negotiated settlements), and any other supporting evidence necessary to substantiate charges related to this Agreement (all the foregoing hereinafter referred to as "records ") shall be open to inspection and subject to audit and/or reproduction, during normal working hours, by the City's agent or its authorized representative to the extent necessary to adequately permit evaluation and verification of any invoices, payments or claims submitted by the Contractor or any of his payees pursuant to the execution of the Agreement. Such records subject to examination shall also include, but not be limited to, those records necessary to evaluate and verify direct and indirect costs (including overhead allocations) as they may apply 40 , ... . to costs associated with this Agreement. 40.2 Records subject to the provisions of Public Record Law, Florida Statutes Chapter 119, shall be kept in accordance with such statute. Otherwise, for the purpose of such audits, inspections, examinations and evaluations, the City's agent or authorized representative shall have access to said records from the effective date of this Agreement, for the duration of the Work, and until 5 years after the date of final payment by the City to Contractor pursuant to this Agreement. 40.3 The City's agent or its authorized representative shall have access to the Contractor's facilities, shall have access to all necessary records, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with this provision. The City or its authorized representative shall give auditees reasonable advance notice of intended audits. 40.4 If an audit inspection or examination in accordance with this Article discloses overcharges in excess of 1 % except negotiated fees by the Contractor to the City, the actual cost of the City's audit shall be paid by the Contractor. If the audit discloses contract billing or charges to which Contractor is not contractually entitled, Contractor shall pay over to the City said sum within 20 days of receipt of a written demand unless otherwise agreed to by both parties in writing. ARTICLE 41. COMPLIANCE WITH LAWS. NONDISCRIMINATION. EQUAL EMPLOYMENT OPPORTUNITY. AND AMERICANS WITH DISABILITIES ACT 41.1 Contractor shall comply with all applicable laws, codes, ordinances, rules, regulations and resolutions and all applicable guidelines and standards in performing its duties, responsibilities, and obligations related to this Agreement, including specifically, but without limitation, where applicable, the Contract Work Hours and Safety-Standards Act, the Lead-Based Paint Poisoning Prevention Act and any other laws, ordinances and regulations made applicable to this Agreement by the Contract Documents or the source of funds. 41.2 Contractor warrants and represents that it does not and will not engage in discriminatory practices and that there shall be no discrimination in connection with Contractors performance under this Agreement on account of race, color, sex, religion, age, handicap, marital status or national origin. Contractor further covenants that no otherwise qualified individual shall, solely by reason of his/her race, color, sex, religion, age, handicap, marital status or national origin, be excluded from participation in, be denied services, or be subject to discrimination under any provision of this Agreement. 41.3 Contractor shall affirmatively comply with all applicable provisions of the Americans with Disabilities Act (ADA) in the course of providing any services funded by the City, including Titles I and II of the ADA (regarding nondiscrimination on the basis of disability), and all applicable regulations, guidelines, and standards. In addition, Contractor shall take affirmative steps to ensure nondiscrimination in employment against disabled persons. 41 . ~ . ARTICLE 42. INDEPENDENT CONTRACTOR Contractor is an independent contractor under this Agreement. Services provided by Contractor or on Contractor's behalf pursuant to this Agreement shall be subject to the supervision of Contractor. In providing such services, neither Contractor nor its agents shall act as officers, employees, or agents of the City. Contractor further understands that Florida Workers' Compensation benefits available to employees of the City are not available to Contractor, and agrees to provide workers' compensation insurance for any employee, or entity working for the Contractor rendering services to the City under this Agreement. This Agreement shall not constitute or make the parties a partnership or joint venture. ARTICLE 43. SUCCESSORS AND ASSIGNS 43.1 The performance of this Agreement shall not be transferred, pledged, sold, delegated or assigned, in whole or in part, by the Contractor without the express written consent of the City. It is understood that a sale of the majority of the stock or partnership shares of the Contractor, a merger or bulk sale, an assignment for the benefit of creditors shall each be deemed transactions that would constitute an assignment or sale hereunder requiring prior City approval. 43.2 The Contractor's services are unique in nature and any transference without City approval shall be cause for the City to nullify this Agreement. Any assignment without the City's consent shall be null and void. The Contractor shall have no recourse from such cancellation. The City may require bonding, other security, certified financial statements and tax returns from any proposed assignee and the execution of an assignment/assumption agreement in a form satisfactory to the City Attorney as a condition precedent to considering approval of an assignment. ARTICLE 44. CONTINGENCY CLAUSE Funding for this Agreement is contingent on the availability of funds and continued authorization for program activities and the Agreement is subject to amendment or termination due to lack of funds, reduction of funds and/or change in regulations, upon thirty (30) days written notice. ARTICLE 45. JOINT PREPARATION- INTERPRETATION The language of this Agreement has been agreed to by both parties to express their mutual intent and no rule of strict construction shall be applied against either party hereto. The headings contained in this Agreement are for reference purposes only and shall not affect in any way the meaning or interpretation of this Agreement. All personal pronouns used in this Agreement shall include the other gender, and the singular shall include the plural, and vice 42 . versa, unless the context otherwise requires. Terms such as "herein," "hereof," "hereunder," and "hereinafter" refer to this Agreement as a whole and not to any particular sentence, article, paragraph, or section where they appear, unless the context otherwise requires. Whenever reference is made to a Section or Article of this Agreement, such reference is to the Section or Article as a whole, including all of the subsections of such Section or Article, unless the reference is made to a particular subsection or subparagraph of such section or article. ARTICLE 46. AMENDMENTS No modification, amendment, or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Agreement and executed by the City and Contractor. ARTICLE 47. SEVERABILITY In the event the any provision of this Agreement is determined by a Court of competent jurisdiction to be illegal or unenforceable, then such unenforceable or unlawful provision shall be excised from this Agreement, and the remainder of this Agreement shall continue in full force and effect. ARTICLE 48. ENTIRE AGREEMENT This Agreement, as it may be amended from time to time, represents the entire and integrated agreement between the City and the Contractor and supersedes all prior negotiations, representations or agreements, written or oral. This Agreement may not be amended, changed, modified, or otherwise altered in any respect, at any time after the execution hereof, except by a written document executed with the same formality and equal dignity herewith. Waiver by either party of a breach of any provision of this Agreement shall not be deemed to be a waiver of any other breach of any provision of this Agreement. [remainder of this page intentionally left blank] 43 . ~ Si {1J,~sal/~~ Print Name W~ESSES: -;. . n~ cj(.~ Signature Lou ~ e s. /2..-4 U , CC? Print Name ..... CONTRACTOR BY: Name & Title \ / I " .(;:~ ArL . ~ ~: . Jane A. Hines, CMC, City Clerk /". . .. .... .. " r.) J . . XPPROVED AS TO FORM AND LEGAL S ICIENCY 44 f . z 'l' f-- ~ !e w ~ ~= :E Z ~ ~ ~h -$ 0 ~ ~ "I ~ ~ -.0 ~!!IIr \! f.': ~ j 0 ~I~ ! fg~" , 9 8U!; I ~~ ; l:'~ :;t c c.: v. I- ; .~J ~.~! ! ;l 0 ~'~~ e w '"1 0 o~ 5 0: .. a.. ;; z w ........ '" ........ :_::.;~ ~. ':N~~lj;:3:()' .'~ j '. '.j t iN~'11V~' I :;:''-:'.::. .;\:<~:. .:'.: ..', .~' .,::. ... .~ 'cc. :~ ~:' .Q;. 'w :> .~. ''':)''' ..:~'~:. - S w f X ~ ~I~~'. U <I.. ._ I d )0. !.~.r n~ ., .f-__. = !!21~~~ III .... to ~!; 0 ! '"'' ! liWi'J!!! dt; ~d. 3...~w ~KiJl: 3 . ~~~.~~~~~a~~gg!!!:~ 45 ... ~ ~ .';: :9 ~ W ~ ~ :J: () <{ UJ w CD Z fIl ~ < I (1)0 ~fIlQ I-UJU> uo::O:: ~') gltlg .... fIlZU. 0(1)0 <a:x: lL_rn olIZU :x:wL5 OW>-Z~~g~~ :X:i=~ ~Z~ a:...J~ ( > wi1l~ Q.::>U ~t5:X: ~(I)~ ~U~ Q.u.:J w Z 00. al ~ - () 04+++1_- 2 ~.; O~ i: 2 ~ ~.S~gi ~I~H_ 1:~Pi ~_ gL ~~~u~i Ii-B~~ ;L,~L UPiii 3i'!j'- h~; h ~Il~ t:~!H ,',.'" , .""",, ,,",," ''',,'~'r':''o-~'',:?~ ft 4 ;W i~ ~~ ~ 31 g it B= I!; I ~~ l tlI ~ I 'I II a~~ ~! I" ~ Ii I I~~ ~e ~~ . il G~ I ~! : ,JU ~~ r ~ e~! ~ i~i! II; ilill!1 ! I ~ III I I~~ Ie ; d ~ ~ ~ It "21 !I~ ~ i ~ I ~ s 1~ ~ ~~ ~ il!i~~; ~ ij h ~ ~ ~ e~l a Ill' I!! Ii' II' Ii ! II . I ~ 1.: .. I~ I e~. I ~ = ~~ e w ~ ~ I l~i~J a I . I ~ !e !H~ 1;1 ~~! ~ Ii ~~ ~ i I I \ I ~.ifi:.s I 1 , ~rl h~ !n ~ ;~ ii : ~ ; \ 'C~~ ... !It!11 ; I ..; l~ ~~i I ..: Iii. lilli' I I! ~II ~ ! · -~ I nH~ \ I I .. I I IIIII : ~JI ~;~ ~ ; ~ !; U: ; I i I I I nil I I I If',ii J I I ~~'"t I I '<h != :l :l ;t Il III ~ II III 11 ~/ I I ( I I il c( L----i l ... i J: I I <( LJ m . '1 JI~ Ii ' ~ . ~~ Ii h~ S15~ ~ wi II ~ ~~w ...~ ;~J 1~~~ w~ ~ ~ ~~Q U ~ . ~~il ~~ f! W'I w~ h ~fl ~6 ~I~ e ~~I ~~ i h ~9 I ~ ~ w I' elt I Iii! ~ W tl ~ ~h~. !!! of '" 111111 II ! 11'1 -I I! I~II~ . . , .a': if ~ . , , , ~J , . i~ ~ , G ~ i:l! ~ ~!ji~ I~ t!~ ~ ~ , ~ , -~ ~r5~ ill I~:;R ~I ~ ~~ II n~ gl , !it . . . !! lLJ hll.I"'f! 'i " "i~I" ' . " " ~ !i:i II I!! i ,II ! m U Ii. I; ! f II C!) ! j ~! ~!I ! i1i~1 ~ U ::~e 8~ U ~~ ' , , , ..1 " i~~~ 1~81;1~llh~1 :~~ i! II~ h ' , U ! ! I~i ~I i~~~ I~e Il<l It! ~is is~ : ! f<t il ~ !: ~ 5h ~hh U n ~~~ ~. n >t II! III Ii " II il III !s . ~ ! a ~ i~~!!~ ~ it : ~ ~ I ; ~;~ I G; ; i ~ Q ~ * i I I A; ;; ~i ~ ii ~~S i~; ~i ~ ~ i~ ~i;e = ~~ i~~ ~i ~ ~~ ~ ~ ~~ ~i ~~ i h ~!; U i I! a I ~ ~II~ II i Hm IIi ~i ~ e ~~!~ ~&~ e ~ ~ ~ ;1 ~ iI ~h ..~~ !~ ~ ~w~s ;I~ ~ !!Ii .; i'ill I!:; I!l!ll! ! !!;!Ihi ~ : i i~ IG ~~ ~ I~i ~~B In! ~ S!*~h~~ : I ! ~~ Ii !I~ ~ I~~ ~~, ~~~ ~ m ~~ Ii ~~! is ah t! I"'~ s~1 ~h u I~ ~ i ~ h ~i ~u ~ .U lis h~ ~g I _~ ... .. 01" '" .. "'.. .. d "II d i I 46 . I . id d~ I ~ . H ~ = n ii 1-' 11 I ill W III lI) :l W a: ~ ~ II: z ~ ~ III! ~ ill ~ I 0:: w , o ... o I- ~ ~ o ~ ~ 5 ~ 'I O::z l- S ~; i 2 ~~llln9i 0:: V) ~r ~r~~r ~I~ t w ~ ~ = 2 ia a ~ I :J I 'at I'" 11l~ .. I- .11 b~ .. w~ .. lI) W I- '" e{ z .... o ...J 0:: o o o t- o Z e{ e{ l- e{ o <I o . \---..I ! JI o I a~ II ~\J ~~ ~ ~ ..~ ~ ~ h lo. ~ ~ '1llli ~I;I'I A - .. h~ Hi iPi a :J ~ !r 6 I( .... -! ~ .... ~ ~~ lib ~~"b~ _c.... ~..,8.. -e~(!j~ ~~g~ -'" ~lt~.... '8 ':l ~ ~ ~t;~~ "o~ulJ..j ~'" ~ ~ " ~ ~~~ 'tti~~~ V)~~t;;~ $ ~ l o 10 20 , , ~ ~{:, ~~ f~ #~ ~! i 4J j ~ S ~ ~ ~ ~ . i ~ .. ~ B 4 ill i it "i ~ 6 I - ---ED :l~~ t ~ I~I~ ~h i~~d ml I~ :: : _c! ~ ~~ ill~r1 ~ ~ - ; 49 i it :1 ,Ijc, ; llii),h I - ~c! , i 'l I _4 Q -4 Q '4 . 04 ., _4 . _4 IC ~t: ~ ~ i . · ~~J ~ :ih~l i,'d: ~ ! R WIH ;ili~ ; <I; I~ t ~ 1 r I. L~ I · J I I) I~ I k:l!nJ !)l~ll ' ~ ~ Illt~it, : 'I(I}II I ~~~l 1 , ~ ~ ..,.~ .0.1 ! .. II Iml '.'f t ! J !J ilt~~it, III. ~ Ii wm i h... mm I l~ll ..lt~it, .:~l~~ ~'w, "'I"l,"'~ -1 . ~ t i t l "'11 ~ J ~ I i Ii .- \~ P '" E a , ~ t 1 h ! .. p~ I i ~ II;" 5 ~ * I s ~ '" ~ I ... ~ ~ VI I ~ ~ I ~ ~ '" ; j ~ i ~ ~ ~ i!' ~ tEE~ - ~ ,. j s. ~ ;1 i Ii ~f , 6 ~ 1 ! /ir-'f1~ ~I 'F'"...c . ~ j~ ,'"'''' e- -- ":::J ~ II J i: ~ II i f!i '" I. .1 ! - i ... .!! I ti .. .. I ... ==:!> :::: ... I ~ I ... I ~ I ~ I .. I ~ I I il"l. ~~ i.~~!! ~-i ..,. ..\.- I, i ['i ." 'IT' i Jj, . ~ ~l 1~ l ~ ~~ I It I, ~ i!: ~i I: 2 iJ '- ="'==~h Q Ii ~; ~ '---T -':1l . <w:.r. yrt- J ti ;! : j> I i'l 1. __J ~ .' - I. i.I ~.' ,-' I: ,~ - !! ; .l. ~~! I' ' 1"11 &' ~ . ~ ~! :!U IE : ,If JI1 Ii ~ ; ! !:~* .1 ! I f ls!!d I~ I ~ ~j!n ih u.Jf; _I ~ I - ~~:!6!i i- It . J ..~h i 1 11 .r g i- It .. ii, f .:i ~ nl II ..' !f ~ I":: H :i nl II II ..___.JJ ie. t - IJt . I "HI l!u \ /'. It. "i< !r! ~.. jli t~Ji ~! c >>I,t i !) j!i' u . to, I 1I~_~_lll c! 1 -c~:"1l U ~ ~ ... rr- -.-... ~ flj , ~ :i~ r' .==== t" ~ I~h ""1- ' ... Hjp! ! ~ ~ ~! , ~ i t; ~ I h . H a~~'-14 l\~~! L ..... mu .,"~..- I I I I I ~ II ~ IiI:....:. : .~ .... . ~. ~!3 . . . . :. is ~ I ~ II ~ ~ I ~ I t;; il 4 ~ ~ !;:l " ~ i.... lti at ~ IS e !i> '"' I' ~ ~ ~ ~ ~ .... ~ L.., U ~ ~ li! Cl.: ~ i- d ~ .t t ~ ~ .. 51 ~ CO 3 ~ ~ . I '1 t. ;n ~ ~. ,~,,"U\l "'"',,,,,, 5~ I tl ,;; J.... .~' ~ ~..... '- g" ~ r-- /:.0.' . . . ' 'i' ~;;' .:::0 , 0 00 ~' . -..i . ! - .1 I 15", L~ . :: I : ~...: 'l , l!tl" 'Y ~~ ...' . ~ =~ "~I! \ \ ~ "~ ~ Ill; ~ a J'ti'l ~ v . N I ~ ~ -.. ..- ~ .1. 11 ~"'~'"'''''''' · S" ~ ~ I.' I "It" \,' Z I" "!:!: I !<l~ , . . f { I . " 1 ~ l l " .1 i ! ... ... ~ ~ ~ e ;S !L J i~ j 'if" : :! ~" ~; t . -LL ~:J ij : II. .;}'.~! '.;~ ~ ~lli! 'i . '. ~ f I : hi ~ l :1 ~ ,. ~;l I ~~ ~!ll~~liQ" ~ " ~ I ~!i ., ~ I.,s' :"",. ~:~ ~ J, liiil -.or:::': ~ UI~ IIIMI : II: i dlH . H :i - ~ Cl i III III II! 1'1 Addendum No. 1 CITY OF SUNNY ISLES BEACH PROFESSIONAL CONSTRUCTION SERVICES FOR CENTRAL ISLAND EMERGENCY OUTFALLSIMPROVEMENTS CITY RFQ NO.1 0-08-01 To All Bidders: Bidders for the above-referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. ~ Section 1.2 of the RFP Specifications has been amended as follows (deletions arc in stricken, and additions are in red and underlined): 1.2 DESCRIPTION OF THE CENTRAL ISLAND EMERGENCY OUTF ALLS IMPROVEMENTS. ESTIMATED BUDGET. AND DEADLINE FOR COMPLETION The Central Island Emergency Outfalls Impro'lements is related to the City's Central Island Drainage project, consisting of a stormwater drainagc and street improvement project in the area north of 171tft Street, south of 183m Street and '.vest of Collins ^ venue (the "Central Island area"). The Central Island Emergency Outfalls Improvements entails impro','ements to the existing storm'Nater management system, consisting of five PDEP previously permitted drainage wells providing three new emergency outfalls and re establishing an existing outfall. Thc proposed project consists of installing three new 24 inch outfalls and re establishing an existing 16 inch outfall in connection to the existing storm'.vater management system and discharging to Dumfoundling Bay. The City of Sunny Isles Beach (the "City") intends to enter into an aqreement with the successful Proposer to perform Central Island Emeraencv Outfalls Improvements in the City of Sunny Isles Beach. Florida. The proiect is located on North Bav Road between 179th Drive and 180th Drive in the City. The proposed proiect consists of installinq a new 24-inch outfall, trench drain. catch basin and connectinq pjpinq. Attachment "A" Proposer submitting bids on this project are expected to familiarize themselves with the DERM approved drawings, attached hereto. The estimated construction budget for the Central Island Emergency Outfalls Improvements project is $50,000.00 (fifty thousand dollars). The successful Proposer shall achieve substantial completion of the work described herein no later than 60 (sixty) days from the issuance of a Notice to Proceed from the City. As a result of this amendment, the RFP opening date has changed from Wednesday, September 15, 2010 to Friday, September 24, 2010 at 10:00 a.m. END OF SECTION . CITY OF SUNNY ISLES BEACH, FLORIDA REQUEST FOR PROPOSALS NO. 10-08-01 CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS 1.1 INTRODUCTION Pursuant to Chapter 62 of the City Code, the City of Sunny Isles Beach, Florida, (the "City") a municipality located in Miami-Dade County, Florida, requests qualified construction service contractors ("contractors") to submit proposals to perform Central Island Emergency Outfalls Improvements in the City. 1.2 DESCRIPTION OF THE CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS. ESTIMATED BUDGET. AND DEADLINE FOR COMPLETION The Central Island Emergency Outfalls Improvements is related to the City's Central Island Drainage project, consisting of a stormwater drainage and street improvement project in the area north of 174th Street, south of 183m Street and west of Collins Avenue (the "Central Island area"). The Central Island Emergency Outfalls Improvements entails improvements to the existing stormwater management system, consisting of five FDEP previously permitted drainage wells providing three new emergency outfalls and re-establishing an existing outfall. The proposed project consists of installing three new 24-inch outfalls and re-establishing an existing 16-inch outfall in connection to the existing stormwater management system and discharging to Durnfoundling Bay. Proposer submitting bids on this project are expected to familiarize themselves with the DERM approved drawings, attached hereto. The estimated construction budget for the Central Island Emergency Outfalls Improvements project is $50,000.00 (fifty thousand dollars). The successful Proposer shall achieve substantial completion of the work described herein no later than 60 (sixty) days from the issuance of a Notice to Proceed from the City. 1.3 SUBMISSION DATE Submittals must be received by the City Clerk's Office no later than Wednesday, September 15, 2010, at 10:00 a.m., at the Sunny Isles Beach Government Center, Attn: City Clerk, First Floor Meeting Room, 18070 Collins Avenue, Sunny Isles Beach, FL 33160. One (1) original, and four (4) copies of the completed and executed Submission must be delivered by this deadline. Submittals will be opened publicly and read aloud at this time. The City reserves the right to accept or not accept late submitted bids based on the sole discretion of the City Manager or his designee. The envelope containing the sealed Submission must be clearly marked as follows: 5 \. "SEALED BID" RFP # 10-08-01 PROFESSIONAL CONSTRUCTION SERVICES FOR THE CENTRAL ISLAND EMERGENCY OUTF ALLS IMPROVEMENTS OPENING DATE AND TIME: WEDNESDAY, SEPTEMBER 15, 2010 AT 10:00 A.M. 1.4 SUBMITTAL REomREMENTS All submittals by contractors shall contain no more than fifteen (15) pages specifically addressing the following issues. Item numbers 9 and 10 below will not be considered a part of the fifteen (15) pages. Any contractor wishing to provide the services described in Section 1.2 above must submit one (1) original and four (4) additional complete copies that include, at a minimum, the following documentation: 1. Name, address and company, including, but not limited to, a business overview, financial state of the business, annual revenue for past two years, and names and addresses of persons having financial interest in the firm. 2. Provide a narrative description of current and previous experience on a project similar to the Central Island Emergency OutfaUs Improvements project described in this RFP. 3. A list of all projects (including government projects) completed or in process for the past five (5) years, and a corresponding list of client references with contact names and telephone numbers. 4. Proof of authorization to transact business in Florida from the Florida Secretary of State, from the prime as well as supporting firms. 5. The name, title, qualifications, experience, and all contact information of the proposed contact person and proposed personnel to be assigned to this project. 6. Provide a detailed description of the Proposer's procedures for coordinating the Central Island Emergency Outfalls Improvements project, including the project implementation schedule, identifying events and the estimated number of calendar days to achieve completion. 7. Provide a detailed financial cost breakdown of the total cost involved in completing the Central Island Emergency Outfalls Improvements project described in this RFP. 8. Provide documentation demonstrating Proposer's fmancial strength and fmandal capability to provide the construction services in this RFP. Such documentation should include Proposer's most recent certified fmancial statements as of a date not earlier than the end of the Proposer's preceding official tax accounting period, with a statement in writing, signed by a duly authorized representative, stating that the present fmancial condition is materially the same as that shown on the balance sheet and income statement submitted, or with an explanation for a material change 6 ~ in the fmanciaI condition. If certified fmandaI statements are not available, provide latest available fmandaI statements (balance sheet and income statement) and letters of credit availability from accredited fmanciaI institutions, or other relevant documentation. 9. Sworn statement pursuant to Section 287.133(3)(A), Florida Statutes, on Public Entity Crime, a copy of which is attached hereto. 10. Non-collusive Affidavit, a copy of which is attached hereto. 1.5 LIABILITY INSURANCE Contractor shall, at its sole cost and expense, during the period of any work being performed under this Agreement, procure and maintain the following minimum insurance coverage to protect the City and Contractor against all loss, claims, damage and liabilities caused by Contractor, its agents, sub- Contractors or employees, as indicated below: D Comprehensive General Liability ("CGL") insurance, with minimum limits of One Million Dollars ($1,000,000) per occurrence, combined single limit for Bodily Injury Liability and Property Damage Liability, and Two Million Dollars ($2,000,000) aggregate. Coverage must be afforded on a form no more restrictive than the latest edition of the Comprehensive General Liability policy, without restrictive endorsements, as filed by the Insurance Services Office, and must include: · CGL Required Endorsements include the following: I. Employees included as insured II. Independent Contractor's Coverage III. Contractual Liability IV. Waiver of Subrogation V. Premises and/or Operations VI. Explosion, Collapse and Underground Hazards VII. Loading and Unloading VIII. Mobile Equipment (Contractor's Equipment) whether owned, leased, borrowed or rented by Contractor or employees of Contractor City is to be expressly included as an Additional Insured with respect to liability arising out of operations performed for City by or on behalf of Contractor or acts or omissions of Contractor in connection with general supervision of such operation. D Worker's Compensation, as required by law, but with no less than $1,000,000 for Employer's Liability. D Business Automobile Liability which shall include coverage for all owned, non- owned and hired vehicles for minimum limits of not less than One Million Dollars 7 ($1,000,000) per occurrence, One Million Dollars ($1,000,000) per accident for bodily injury and Five Hundred Thousand Dollars ($500,000) per accident for property damage. o Professional Errors and Omissions Liability in the amount of One Million Dollars ($1,000,000) per occurrence for Professional Design. Insurance required of the Contractor shall be primary to, and not contribute with, any insurance or self-insurance maintained by the City. Such insurance shall not diminish Contractor's indemnification and obligations hereunder. The insurance policy(ies) shall be issued by companies authorized to do business under the laws of the State of Florida and acceptable to the City with a minimum A.M. Best rating of A-Excellent. Before any work under this Agreement is performed, and at any time upon request, Contractor shall furnish to the City certificates of insurance evidencing the minimum required coverage and shall be appropriately endorsed for contractual liability, with the City named as additional insured. All policies shall contain a waiver of subrogation endorsement. All policies and certificates shall be in forms and issued by insurance companies acceptable to the City's Risk Management Department. All insurance policies and certificates of insurance shall provide that the policies may not be canceled or altered without thirty (30) days prior written notice to the City. The City reserves the right from time to time to change the insurance coverage and limits of liability required to be maintained by Contractor hereunder. Contractor shall also require and ensure that each of its sub- Contractors providing services hereunder (if any) procures and maintains, until the completion of the services, insurance of the types and to the limits specified herein. ANY EXCEPTIONS TO THE INSURANCE REQillREMENTS IN THIS SECTION MUST BE APPROVED IN WRITING BY THE CITY. 1.6 PERFORMANCE AND PAYMENT BONDS Proposer shall, at its sole cost and expense, during the period of any work being performed under this Agreement, procure and maintain performance and payment bonds each equal to 100% of the Contract Amount awarded to the successful Proposer. The Performance and Payment Bonds must be written by a Surety licensed to do business in the State of Florida and otherwise acceptable to the City of Sunny Isles Beach. As per Florida Statute Section 255.05, the Proposer shall be required to record the Performance and Payment Bonds in the public records of Miami- Dade County. 1.7 BIDBOND Each Bid shall be required to be accompanied by a Bid Bond, duly executed by the Proposer as principal and having as surety thereon a surety company licensed to do business in the State of Florida, satisfactory and payable to the City of Sunny Isles Beach, Florida, and listed in the latest issue of U.S. Treasury Circular 570, in the amount of 5 % (five percent) of the Proposal. 8 1.8 ADDITIONAL INFORMATION OR CLARIFICATION Requests for additional information or clarifications must be made in writing and received by Jorge L. Vera, Assistant City Manager, as specified in the Public Notice section of this RFP, in accordance with the deadline for receipt of questions also specified in the Public Section of this RFP. The request for additional information and clarification must contain the RFP number and title, contractor's name, name of contractor's contact person, address, phone number, and facsimile number. Electronic facsimile requesting additional information must be received by Jorge L. Vera, Assistant City Manager, for this RFP at the fax number (305) 792-1561. Facsimiles must have a cover sheet which includes, at a minimum, the contractor's name, name of contractor's contact person, address, number of pages transmitted, phone number, facsimile number, and RFP number and title. The City will issue responses to inquiries and any other corrections or amendments it deems necessary in written addenda issued prior to the Submission deadline. Contractors should not rely on any representations, statements or explanations other than those made in this RFP or in any written addendum to this RFP. Where there appears to be conflict between the RFP and any addenda issued, the last addendum issued shall prevail. 1.9 SELECTION. AWARD. AND PROTEST PROCEDURES The City will select the contractor the City determines to be the lowest responsible, responsive contractor ("Successful Contractor") whose proposal represents the best value to, and is in the best interests of, the City. The City will act, at its sole discretion, in what it considers to be the best value and best interest of the City. The City will evaluate the comparable experience, capability, project management, workload, financial strength, and other factors the City deems pertinent and will select the firm that it deems to be lowest responsible, responsive contractor. The City will determine the lowest responsible, responsive contractor in accordance with the criteria set forth in Section 62-8 of the City Code. Any protests or objections to the City's Request for Proposal, select of the Successful Contractor, and/or Contractor award process must be submitted in writing in accordance with Section 62-15 of the City Code. If the City and Successful Contractor are unable to negotiate a mutually acceptable contract, the City may terminate the contract negotiations and begin negotiations with the other qualified firms. This process may continue until a contract has been executed or all Submissions have been rejected. No contractor shall have any rights in the subject project or against the City arising from such negotiations. 1.10 CONTRACT EXECUTION A contract will be negotiated and executed between the Successful Contractor and the City in substantially the same form as the attached Agreement. The successful operation of this contract requires that the Successful Contractor and the City agree to act in good faith in all matters relating to carrying out the project and the interpretation of the contract documents. 9 - 1.11 UNAUTHORIZED WORK The Successful Contractor shall not begin work until a Notice to Proceed is received. The Notice to Proceed shall specify the period of time allotted for the completion of the work. 1.12 INSTRUCTIONS Careful attention must be given to all requested items contained in this RFP. Contractors are invited to submit Submissions in accordance with the requirements of this RFP. PLEASE READ THE ENTIRE SOLICITATION BEFORE SUBMITTING A SUBMITTAL. Contractors shall make the necessary entry in all blanks provided for the responses. The entire set of documents, together with all attachments hereto, constitutes the RFP. The contractor must return these documents with all information necessary for the City to properly analyze contractor's response in total and in the same order in which it was issued. Contractor's notes, exceptions, and comments may be rendered on an attachment, provided the same format of this RFP text is followed. All responses to this RFP shall be returned in a sealed envelope or package with the RFP number and opening date clearly noted on the outside of the envelope. Contractors must provide a response to each requirement of the RFP. Responses should be prepared in a concise manner with an emphasis on completeness and clarity. 1.13 CHANGESI AL TERA TIONS Contractor may change or withdraw a response at anytime prior to the submission deadline; however, no oral modifications will be allowed. Written modifications shall not be allowed following the submission deadline. 1.14 SUB-CONTRACTOR(S) A Sub-Contractor is an individual or firm contracted by the contractor or contractor's firm to assist in the performance of services required under this RFP. A Sub-Contractor shall be paid through the contractor or contractor's firm and shall not be paid directly by the City. Sub- Contractors are allowed by the City in the performance of the services delineated within this RFP. However, the contractor must clearly reflect in its Submission that major Sub-Contractors to be utilized in the performance of the required services. The City retains the right to accept or reject any Sub-Contractors proposed in the response of Successful Contractor or at anytime prior to contract execution. Any and all liabilities regarding the use of a Sub-Contractor shall be borne solely by the Successful Contractor and insurance for each Sub-Contractor must be maintained in good standing. Neither Successful Contractor nor any of its Sub-Contractors are considered to be employees or agents of the City. Failure to list all Sub-Contractor(s) and provide the required information may disqualify any proposed Sub-Contractors from performing work under this RFP. Contractors shall include in their responses to this RFP the requested Sub-Contractor information and include all relevant information required of the contractor. In addition, within five (5) working days after the identification of the award to the Successful Contractor, the Successful Contractor shall provide a list confirming the Sub-Contractors that the Successful Contractor intends to utilize in the contract, if applicable. The list shall include, at a minimum, 10 ..... the name, location of the place of business of each Sub-Contractor, the services Sub-Contractor will provide relative to any contract that may result from this RFP, as well as any applicable licenses, references, ownership, and other information required of Contractor. 1.15 DISCREPANCIES. ERRORS. AND OMISSIONS Any discrepancies, errors, or ambiguities in the RFP or addenda (if any) should be reported in writing to Jorge L. Vera, Assistant City Manager, in the Public Notice specified in this RFP. Should it be necessary, a written addendum will be incorporated to the RFP. The City will not be responsible for any oral instructions, clarifications, or other communications. 1.16 DISQUALIFICATION The City reserves the right to disqualify responses before or after the submission deadline, upon evidence of collusion with intent to defraud or other illegal practices on the part of the contractor. The City also reserves the right to waive any immaterial defect or informality in any responses to this RFP; to reject any or all responses in whole or in part; or to reissue an RFP for the services described herein. 1.17 SUBMISSION RECEIPT Sealed responses will be accepted in accordance with the instructions detailed on the cover of this RFP. The contractor shall file all documents necessary to support its response and shall include them with its Submission. Contractor shall be responsible for the actual delivery of responses during business hours to the exact address indicated in this RFP. The City reserves the right to accept or not accept late submitted bids in the sole discretion of the City Manager or his designee. 1.18 CAPIT AL EXPENDITURES The Successful Contractor understands that any capital expenditures that the Successful Contractor makes, in order to perform the services required in this RFP, is a business risk which the Successful Contractor may include in its proposed price. The City, however, is not and shall not payor reimburse any capital expenditures or any other expenses, incurred by any Contractor, in anticipation neither of a contract award nor to maintain the approved status of the Successful Contractor if a contract is awarded. 1.19 WORK RESTRICTIONS Work shall be performed at the project site during normal business working hours from 7 AM. to 5 P.M. Monday through Friday, and Saturday from 9 AM. to 5 P.M. except as otherwise approved by the City. 11 d 1.20 RESERV ATION OF RIGHTS While pursuing this RFP process, the City reserves the right to: . Accept any or all responses, and the right, in its sole discretion, to accept the contractor who will best serve the interests of, and represent the best value to, the City in conformity with the criteria set forth in Section 62-8 of the City Code. · Reject any and all qualifications and to seek new qualifications when such a procedure is reasonably in the best interest of the City. . Investigate the financial capability, integrity, experience, and quality of performance of each contractor, including officers, principals, senior management, and supervisors, as well as staff identified in the response to RFP. · Investigate the contractor's qualifications or any of its agents, as it deems appropriate . Conduct personal interviews of any or all prospective contractors prior to selection (the City shall not be liable for any costs incurred by the contractor in connection with such interviews). . Waive any of the conditions or criteria set forth in this RFP. . The City reserves the right on any advertised selection process to decide whether to select a firm based on the proposals received or whether to hold interviews with the firms the City deems best qualified for this project. 1.21 ADDITIONAL INFORMATION . The Submission must clearly be marked on the front of the envelope: "SEALED BID" RFP #10-08-01 PROFESSIONAL CONSTRUCTION SERVICES FOR THE CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS PROJECT OPENING DATE AND TIME: WEDNESDAY, SEPTEMBER 15,2010 AT 10:00 A.M. · Questions regarding this RFP must be directed, no later than seven (7) calendar days before the opening of the RFP, to: Jorge Vera Assistant City Manager City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 792-1912 Email: JVera@sibfl.net · Responses to this RFP must be delivered by the stated deadline to: Attn: Jane A. Hines, CMC City Clerk 12 .~ Sunny Isles Beach Government Center 18070 Collins Avenue First Floor Conference Room Sunny Isles Beach, FL 33160 · The opening of the Submissions will be in the First Floor Conference Room, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 at the stated time. . Submissions will be opened publicly and read aloud at this time. . The City is under no obligation to return the Submissions. · The City will not be liable for any cost incurred in the preparation of the response to RFP. . The Submissions shall be prima facie evidence that the contractor has full knowledge of the scope, nature, quantity and quality of work to be performed; the detailed requirements of the specifications; and the conditions under which the work is to be performed. . The contractors shall furnish the City with such additional information as the City may reasonably require. . Under no circumstance should any prospective contractor or anyone acting on their behalf, seek to influence or to gain the support of any member of the City Commission or City Staff favorable to the interest of the prospective contractor. Likewise, contact with the City Commission or City Staff against the interest of other prospective contractors is prohibited. Any such activities may result in the exclusion of the prospective contractor from consideration by the City. 1.22 EXHIBITS The Exhibits to this RFP are as follows: Exhibit "A" Public Entity Crime Affidavit Exhibit "B" Non-Collusive Affidavit Exhibit "C" Agreement between the City and the successful contractor Exhibit "D" DERM approved drawings prepared by Beiswenger, Hoch & Assoc. 13 - SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to Crt-'1 a\- ~::>..)..,\'\I... ~s,.if3> DeVoe\"-" , \ ~ r\( ...}f-r.......0+e ::~. .. ",,"'" ""-_~ ~ by .;>...~,~ I';i?~, m ~'i:::llnge,l:1t1 van..! =~ !~ for .f \(~c,.:::;;; (\ f\GJ; Gr.,;.--\ (,iJ('~i ('''1 s.: .... i.ti(p\ (~ (C'JI \;:::ji 1dn\.,~ \';:.'1'1 ~ ,"<,;'('V,(L' Ct, t~\\ \ - . ' .) I j. \"'1. \' r.:; .1-2 v"""......\"'- whose business address is ,:';:'C6i I{Vl ~81r, ,~titm",~, '-)!;'..Jt4'1 G.-:{t~&~",>, ,Ct ~(n~ and (if applicable) its Federal Employer Identification Number (FEIN) 5q' '- '24'2 CSS 50 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. I understand that a "public entity crime" as defined in Paragraph 287. 133(l)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(1)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non jury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287 . 133(1)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the . entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. Exhibit "A" 14 5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The tenn "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the ~lowing three (3) statements is applicable.) -I- (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO , WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE ifJa2 OF ANY CHANGE m THE mFORMA:O:O:!~'J::NED m TH~ . SIGNA~ (Printed or Typed Legal Name of Affiant) 15 State of Florida of County of Miami-Dade) t" r--, Sworn to and subscribed before me this o\--~ - . ------ . tel. L)-.:.:,/Y\\ \/\O,\)~ 7_ day of ~~L. ,2010 by -, Notary Seal; ........ ZOE SANTEIRO l' ---',---:-::" \~ ~,. " ,.,r ., ~!t!''Ji.~~ MY COMMISSION # 00969694 "-(jk/ / 1 :.,:.~.~: EXPIRES March 09. 2014 ., .....---: .~' , '''~'' '",i!!::: . ~"'~I'\\\ FtoridaNotaryServlce.ccm ........ \ (407) 396-0153 --- .-- '- Notary's Name Printed, Stamped or Typed Personally Known: /" or Produced Identification Identification Produced 16 NON-COLLUSIVE AFFIDA VIT State of Florida ) )ss County of Miami-Dade) ~,-.; ry,' ;'i,! ;..iOEwflgue:1: being first duly sworn, deposes and says that: (1) Helshe is the (Owner, Partner, Officer, Representative, or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this affiant. Exhibit "B" 17 FURTHER, AFFIANT SAYETH NAUGHT. ~tL7.~.~ ..,r i.~(J !)omii1guaz ~ ","- -'~~Cl-\-y'J ~~'I""~-"'" i~K;. A-_r~-"'."" ~,,,",,r..,,,,_.,,,,, ,..J'-......~.,'lU~~~ ( d) ~"..J'I.. ,.",.-~~,., ,-, '~.' , ~_., .", ven or President/Owner Sworn to and subscribed before me thisO-?:' day of ~ p\.- . .2010, by I:: r~ .~(Yl1 v'lC, LifL.. (President/Owner) of . 0 ~U~hfQ<;'~VVI f~~IV:<.f(IV1(~Q\'{~U.~~\~hO is(pe;'so;'aIIYk~~;;'~)o me or has produced a ~.._,..~-~-_. as identification. 0""',,-/" ZOE SANTEIRO N # 00969694 EXPIRES March 09. 2014 FloridaNolaryServlce.com My Commission Expires: u.LJ"cU-'\Yt) dO\L\ My Commission No.:DD<==i <oy ~ it 18 Southeastern Engineering Contractors, Inc. 12054 NW 98th Avenue Hialeah Gardens, FL. 33018 Tel: 305-557-4226 Fax: 305-557-8568 PROFESSIONAL CONSTRUCTION SERVICES FOR CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENT CITY OF SUNNY ISLES BEACH MIAMI-DADE COUNTY, FLORIDA Date: SEPTEMBER 24, 2010 TABLE OF CONTENS 1-Company Information 2-Narrative description of current and previous experience 3-List of Projects 4-Proof of authorization to transact in Florida 5-Name, title, qualifications, experience and contact information of proposed personal to be assigned to this Project 6-Schedule and estimated number of calendar days 7-Detailed financial cost breakdown 8-Sworn statement pursuant to Section 287.133(3)(A), Florida Statutes 9-Non-collusive Affidavit DESCRIPTION OF CURRENT AND PREVIOUS EXPERIENCE ON A PROJECT SIMILAR TO THE CENTRAL ISLAND EMERGENCY OUTFALL IMPROVEMENT PROJECT City of Sunny Isles Beach City of Miami City of Hialeah Town of Golden Beach Town of Bay Harbor Islands Drainage & Street Improvements This Project is located along the north end by NE 182rd Street, along the south by NE 174th Street and the Dumfoundling Bay and Collins Ave. along the west and east respectively. The Project consist of the following: Milling and resurfacing, pavement reconstruction of all the local streets. Design and construction of a new storm sewer system and Establishing a network of drainage deep wells for discharge of the storm water runoff. Fairlawn Storm Sewer Improvement Phase III Project B-50704 The location of the Project is in the boundary of West Flagler Street and SW 8th ST between SW 56th Ave. and SW 4ih Ave and West Flagler St and NW 5th ST between NW 52 Ave. and NW 50th Ave. The scope of work includes construction of new storm drain that connects to an existing drainage, roadway milling and resurfacing, ADA ramps installation and damaged sidewalk replacement, re-grade and/or reconstruct swale areas to street blocks impacted by drainage improvements activities East 4th Avenue-from E 25th ST to East 32nd ST This Project is located at East 4th Avenue-from E 25th ST to East 32nd ST The Project consist of the complete reconstruction of East 4th Ave., including new sidewalk, curb and gutter and drainage improvements consisting of new draining inlets, 18" storm sewer cross drainage pipe, and Exfiltration trench (French-drain). Also proposed in the project scope are pavement milling and resurfacing. Golden Beach Drive Streetscape Improvements, Town-wide storm water improvements, water improvements, water main reconstruction and underground conversion of utilities. Work for this contract include: Golden Beach Drive Streetscape (re- alignment of road, new concrete curb and gutter, 7 ft wide sidewalk, landscaping improvement, irrigation, and relocation of existing street lights); Town-wide storm water drainage improvements(installation of structures and construction of pump station and outfalls to intra- costal); Town wide replacement of water main with new 8" D.I.P. water-main and conduit installation for undergrounding of utilities (FPL, AT & T, and Atlantic Broad Band.) Community Enhancement PH-3 Utility Improvements Work for this contract include all items necessary for the construction of new water main and services in existing roadways, including saw-cut the road before excavating trenches for pipes and shall be responsible for temporary restoration of the asphalt surfaces and final restoration. . ..... . - . . .. . . . .. .. '" 0"' . .. '.;PR,EVlqUS EXPERIEN.~.E. PROJECTS COMPLETED (LAST 5 YEARS) (fully bonded) Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Central Island Drainage & Street Improvements $6,646,141,00 Unit Prices City of Sunny Isles Mr. Rick Conner, City Manager, 786-208-3498 February 2010. Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Belen Pump Stations $6,391,000,00 Unit Prices Miami Dade County, Public Works Dept. Mr, Antonio Cotarello, P.E., Div. Chief 305-375-2116 December 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Basin 21 Drainage Improvements and Pump Station $2,600,000.00 Unit Prices Miami Dade County, Public Works Dept. Mr. Antonio Cotarello, P.E., Div. Chief 305-375-2116 September 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: District 3 Roadway Improvements $1,505,100,00 Unit Prices City of Miami Mr. ala A. Aluko, Director CIP, 305-416-1280 March 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: NE 1ih Ave Roadway Improvements $810,474,00 Unit Prices City of North Miami Mr. Aleem Ghany, P.E., 786-586-7141 February 2009 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: NW 62nd Street Roadways Improvements $6,378,000.00 Unit Prices Miami Dade County, Public Works Dept. Mr. Antonio Cotarello, P.E. Div. Chief 305-375-2116 December 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Downtown Beautification Project $1,295,000.00 Job Order Contract City of Miami Mr, ala A. Aluko, Director CIP, 305-416-1280 December 2008 2 ~~!R~G~~~~ll~ ..--.. ",PREVIOUS EXPERIENCE,... Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Hanford Blvd Streetscape $8,100,000,00 Unit Prices City of North Miami Beach Mr, Hiep Huynh, P,E, City Engineer, 305-948-2925 August 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Canal 13 Control Structure $1,037,046,00 Unit Prices South Broward Drainage District Mr. Leo Schwartzberg, P.E. Director, 954-680-3337 July 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Buena Vista Phase I, II, III, Paving & Drainage $3,010,111.00 Job Order Contract City of Miami Mr. Ola A. Aluko, Director CIP, 305-416-1280 June 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: 54" dia. Force Main, Microtunnellnstallation at NW 62nd Street $1,995,925.00 Unit Prices Miami Dade Water & Sewer Mr. Nelson Cespedes, Project Manager, 305-607-0799 February 2008 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: NE 4th Street Streetscape $1,007,000.00 Job Order Contract City of Miami Mr. Mr. ala A. Aluko, Director CIP, 305-416-1280 December 2007 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Ponce de Leon Boulevard Median Improvements $.1,800,374.00 Unit Prices City of Coral Gables, Public Works Dept. Mr, Alberto Delgado, P.E., Director, 305-460-5001 June 2006 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: S-718, 8" Water Main Installation $643,000,00 Unit Prices Miami Dade Water & Sewer Mr. Nelson Cespedes, Project Manager, 305-607-0799 March 2006 3 ~~SR~G~~~~S~!] ',PREVIOUS EXPERIENC~, - Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Arch Creek Pump Stations & Drainage Improvements $4,869,000,00 Unit Prices Miami Dade County, Public Works Dept. Mr. Pedro Marzan, Project Manager, 305-281-9062 December 2005 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: 20 inch Transmission Main at Strand Ave Bridge $342,000,00 Unit Prices City of North Miami Beach Mr. Hiep Huynh, P.E., City Engineer, 305-948-2925 May 2005 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: 24",36",42",48" dia. Water Mains Installation, S-746A & S-746B $2,657,000,00 Unit Prices Miami Dade Water & Sewer Mr. Humberto Codispoti, P.E. , Assist. Director, 305-790-0235 March 2005 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Corona del Mar Roadway Improvements $1,319,830.00 Unit Prices City of North Miami Beach Mr. Hiep Huynh, P.E., City Engineer, 305-948-2925 February 2005 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Paving & Drainage County Wide (FEMA) $8,000,000.00 Unit Prices DERM,Miami Dade County Mr, Eduardo Vega, P.E. Assistant Director, 786-552-8571 January 2005 NW 11 oth Street Improvements $2,840,000.00 Unit Prices Miami Dade County Public Works Dept. Mr. Antonio Cotarello, P.E. Div. Chief, 305-375-2116 August 2004 Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: Project Title: Contract Amount: Type of Contract: Client: Client's Rep: Completion Date: NE 6th Ave Improvements $3,458,000,00 Unit Prices City of Pompano Beach Mr. Randall Fowler, P.E" City Engineer, 954-786-4144 August 2004 4 ~~!R~G~~~~ll~ /7./ .. fltJtheustern ENGINEERING COffTRACrO/J~ /Nt PROJECTS UNDER CONSTRUCTION (Fully Bonded) Project title: Capital Improvement Project Type of Construction: Roadway, Drainage, Pump Station Contract Amount: $13,926,071.00 Type of Contract: Unit Prices Client: City of Golden Beach Client's Rep: Mr, Ramon Castella, P,E., 305-445-2900 Completion Date: Dec, 2010 Project title: Transfer Pump Station, Contract No, S-806 Type of Construction: Pump Station Contract Amount: $28,305,698,00 Type of Contract: Unit Prices Client: Miami Dade Water & Sewer Department Client's Rep: MS.Alma Santiago, P.E., 786-552-8150 Completion Date: Jan, 2012 Project title: Roadway Improvements East 4th Ave, Hialeah Type of Construction: Roadway, Drainage Contract Amount: $917,112,57 Type of Contract: Unit Prices Client: City of Hialeah Client's Rep: Mr. Jose Sanchez, Streets Engineer, 305-687-2611 Completion Date: July 2010 Project title: 4" Force Main Installation Type of Construction: Force Main Contract Amount: $134,879.39 Type of Contract: Unit Prices Client: City of Plantation Client's Rep: Mr. John Adams, Utilities Project Specialist, 954-865-8296 Completion Date: Sept 2010 Project title: Fairlawn Storm Sewer Improvements Type of Construction: Roadway, Drainage Contract Amount: $3,555,455.73 Type of Contract: Unit Prices Client: City of Miami Client's Rep: Mr. Ola A. Aluko, Director CIP, 305-416-1280 Completion Date: April 2011 fl i i PROJECTS UNDER CONSTRUCTION (Fully Bonded) Project title: NE 172 Street / NE 170 Street Improvements Type of Construction: Storm Sewer Pump Station Contract Amount: $1,394,000.00 Type of Contract: Unit Prices Client: City of North Miami Beach Client's Rep: Mr. Hiep Huynh, P.E. City Engineer, 305-948-2925 Completion Date: April 2011 Project title: Utilities Improvements Phase III Type of Construction: Water Main Installation Contract Amount: $1,161,000 Type of Contract: Unit Prices Client: Town of Bay Harbor Client's Rep: Mr. Randy Daniel, P.E., Town Engineer Completion Date: July 2011 j~ ~fJthgaIfern ~ ENGINEERING COffTRACTonS,/NC . .... . ..... .....-,....- - .. j .."......,-. '.':..' ..' P' .., .. .... .-,. ..... .. .... ..'-- ...-"",,:"" City of North Miami 17050 NW 19th Avenue North Miami Beach, Florida 33162 Hiep Huynh, City Engineer (305) 336-9924 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Rick Connor, City Manager (305) 792-1928 Miami Dade County Water & Sewer 111 NW 1 Street Miami, Florida 33128 Eduardo Vega, PE, Assistant Director (305) 375-2960 City of North Miami 1815 NE 150lh Street North Miami, Florida 33181 Aleem A. Ghany, PE, Public Works Director (305) 895-9833 FIRM.REFEBENCES ~!i!!R~G~O~!~S~I~ - Florida Department. of Transportation CHARLIE CRIST GOVERNOR 605 Suwannee Street Tallahassee, FL 32399-0450 STEPHANIE C:KOPELOUSOS SECRETARY July 2, 2010 SOUTHEA$TERN ENGINEERING CONTRACTORS, INC. 12054 NW' 98TH AVE . HIALEAH GARDENS FL 33018 *REVISED* RE: CERTInCATE;..PK }FW~:PV~IC;:b+I~9N:' . .,.... Dea.r Sj r/Madallr:. The Department of Transportation has qualified your company for the amount and the type of work' indicated below. Unless your company is notified otherwise, this rating'will expire 6/30/2011. However, the new applicat~on is due 4/30/2011. In accordance with S.337.14' (1) F.S. your next application must be filed within (4)'months of the ending date of the applicant's audited 'annual financial . statements and, if applicable, the audited interim finan~ial statements. Section . 337.14 (4) F.S. provides that your certificate will be valid foi 18. months ~fter your financial statement date. This gives a two month period to allow you.tobid .on jobs as we process your new application for qu'alification. .To remainqualifi'ed with the Department, a new application must be submitted subsequent to any significant change in the 'financial position or the structure of your firm as described in Section 14-22.005(3), Florida Administrative Code. MAXIMUM CAPACITY RATING: $47,700,000.00 FDOT APPROVED WORK CLASSES: DEBRIS REMOVAL (EMERGENCY), DRAINAGE ,___FLEXIBLE PAVING,' GRADING, HOT PLANT-MIXED BITUM. COURSES, MINOR BRIDGES FDOT APPROVED SPECIALITY CLASSES OF WORI(: """"".... UNDERGROUND UTILITIES (WATER & SEWER), SEWER PUMOP STATION "..4.-:.,;. .. . . '. . . . . . ',' ,'. '. '. .... ~"', ',..,.. . . Pleas:e be advised tlie Departlirt:nt of 'rrransporta.:tion>~ha:s cori'$.idered:your company's' qualification in all work classes requested. We have evaluated your company's organization, management, work experi.ence, work performance and adequacy of equipment as directed by section 14~22.003, Florida Administrative Code. Based 'on this evaluation, the Department is not able, at this time, to pr'equalify your company for the wor~ classes: PORTLAND CEMENT CONCRETE. WWIN, dot, state, fl. us @ RECYCLED PAPER E 1915 "..:....;.......:.:.,;. . :~N~:::~~~~.;!~,l; '.15 certified under the provisior:ls of Chapter 10 of Miamf-6ad~i~.6~fily ll/~l.(t.u.)i~ 0{ .J~i!i1~'..,tfu.r:i! I~'; f Ii( I~~ 'CTQ8 Construction Trades Qualifying Board BUSINESS CERTIFICATE OF COMPETENCY ~~1~G~2!!~s~l!! EDUARDO DOMINGUEZ, PE, GC President / Principal in Charge Professional Experience Southeastern Engineering Contractors, Inc. President / Professional Civil Engineer (1984 - Present) Miami-Dade County Public Works Department, Engineering & Services Division Project Engineer (1974 - 1984) Dagma Building Corporation - Project Supervisor (1973 - 1974) Michigan Testing Engineering, Inc. - Assistant Engineer Manager (1971 - 1973) Education Florida International University 1974, Bachelor of Science in Civil Engineering Florida Atlantic University 1969 - 1970, Civil Engineering Miami Dade Jr. College 1969, Associate in Art in Civil Engineering Technology Licenses State of Florida Registered Professional Engineer, No, 0034-223 State of Florida Registered General Contractor, No. 0066528 Broward County General Engineering License, CC No. 93-1360 Miami-Dade County General Engineering License, No. E 1915 Professional Affiliations Florida Engineering Society American Society of Civil Engineers National Society of Professional Engineers References City of North Miami 17050 NW 19th Avenue, North Miami Beach, Florida 33162 Heip Huynh, PE, City Engineer, (305) 336-9924 City of Sunny Isles Beach 17050 NE 19th Avenue, Sunny Isles Beach, Florida 33160 Rick Connor, Public Works Director, (305) 792-1928 Miami-Dade County Water and Sewer 111 NW 1 st Street, Miami, Florida 33128 Eduardo Vega, PE, Assistant Director, (305) 375-2960 City of North Miami 1815 NE 150th Street, North Miami, Florida 33181 Aleem A. Ghany, PE, Public Works Director, (305) 895-9833 12054 N.W. 98th Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 <<9.!!!~G~O~t~S~I~ EDUARDO DOMINGUEZ, Jr. Senior Project Manager Professional Experience Southeastern Engineering Contractors, Inc. Vice President / Senior Project Manager (1992 - Present) Mr. Dominguez is a highly accomplished Vice President / Senior Project Manager with a verifiable track record of managing complex projects. He has strong management skills on large projects. He is in charge of the company's Project Managers, Superintendent and Administrative staff. His additional areas of expertise include: Estimating Project Scheduling Reports Documentation Project Managing & Tracking Report Preparation Project Development Process Improvements Safety Compliance Change Control Management Project Risk & Scope Project Planning M.O.T. Education Hialeah - Miami Lakes Senior High School High School Diploma Technical Certifications Microsoft Excel/Advanced Power Point Primavera P3 Scheduling Primavera Project Planner, Suretrack Programs Florida Advanced Work Zone Traffic Control OSHA Roadway Safety Training Languages Fluent in English and Spanish References Miami-Dade County Public Works 111 NW 1st Street, Suite 1420, Miami, Florida 33128 Pedro Marson, County Project Manager, (305) 281-9062 City of North Miami 17050 NW 19th Avenue, North Miami Beach, Florida 33162 Heip Huynh, PE, City Engineer, (305) 336-9924 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 Rick Connor, Public Works Director, (305) 336-9924 Town of Golden Beach 1 Golden Beach Drive, Golden Beach, Florida 33160 Alexander Diaz, Town Manager, (305) 932-0744 12054 N.W. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 FABIO ANGARITA Project Manager - <<9.~EtR~G~~!o~Sr,~ Professional Experience Mr. Angarita has over 8 years of experience in all phases of construction / project management. He is responsible for the planning, organization, directions, control and evaluation of construction projects from beginning to end according to work schedule, contract conditions and planned budget. He is also in charge of the plan and preparation of schedules and stages to be followed, verifying progress compared to data, directing the purchase of all construction materials and acquisition of grounds, hiring the staff and supervising the work of subcontractors and subordinate employees. Pro'ect Name MDC-DERM Seaboard Access Ditch Enclosure MDC Camillus House - Water Main Extension MDC-WASD Contract W-866 - 36" Water Main at SW 288th St. between 152nd Ave, & 14th Ave. MDC-WASD Contract ER - 47862 -12" Force Main on NW 1 th Street between 37th & 33rd Ave. Cit of Tamarac 6" FM and connection to lift station MDC-WASD Water Main Extension on SW 241 - 26th St. & 12th - 129th Ave. City of Coral Springs Reconstruction of NW 44th St. City of Tamarac - Water Main Replacement of Tamarac Lakes Blvd. March 2005 - Ma 2005 Broward Co un 1m rovements FDOT SR 915 Draina e & Roadwa 1m . FDOT Roadway Imp. at A1A between 751n St. & 88th St. Nature of Work Draina e & Roadwa 1m . Water Main Water Main Amount $400,000 $100,000 $1,050,000 Force Main Force Main Water Main . $750,000 $150,000 $900,000 Nature of Work Draina e & Roadwa 1m Drainage & Roadway Restoration WM Replacement & Roadway Reconstruction WM Replacement, Roadway Restoration & Resurfacin Sewer & Roadwa Reconst. Concrete, Millin & Resurfacin Concrete, Milling & Resurfacing Amount $850,000 $1,175,000 $760,000 $750,000 $1,050,000 $1,150,000 $1,330,000 Education Colombian School of Engineering 1998, Bachelor of Science in Civil Engineer 2001, Actualization in Design of Aqueduct Systems References City of Sunny Isles Beach, 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 Bill Evans, Public Works Director (786) 586-7533 City of Miami, 444 SW 2nd Avenue, Miami, Florida 33130 Felix Rodriguez, City Construction Manager (305) 216-9544 South Broward Drainage District, 6591 SW 60th Avenue, Southwest Ranches, Florida 33331 Leo Schwartzberg, Director (954) 680-3337 12054 N.W. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 . "."0:--'-..-,' '. ;~y_:"; <;\-, '. .-~,' -:"'1", - ,,' ,- ',"'.- ~ ',' ",-: '.' ,C/,'''"'_ ,y<_-,-~ ,~-. ',',t:''''"'' :-__c"'~_' "0' ;,_, -.;' ': '-, ":.,.,.".-' . ::J- .,_.<.'-,: '_'0".',. ", 'l;"',.:;:_-" O>'''':''~' ';"-;;C'i'~;',,"~""" ........'...""'T"..'~~ <<9.~l~G~~t~n~ RENE HERNANDEZ Superintendent / Safety Officer Professional Experience Southeastern Engineering Contractors, Inc, General Superintendent (1990 - Present) City of Miami Public Works Department 444 SW 2nd Avenue, 8th Floor, Miami, Florida 33130 Public Works Inspector (1988 - 1990) Hightech Engineering, Inc. Owner / President (1980 - 1988) Gianneti Construction, Inc. Supervisor of Roadway (1974 - 1980) Mr, Hernandez has more than 34 years of experience in roadway and Water & Sewer projects. He has supervised and satisfactorily completed numerous Public Works Projects under contract with Miami Dade County and Broward County. He has acted in the capacity of General Superintendent for municipal projects ranging from $2,000,000 to $14,000,000. He has also successfully completed paving and drainage projects for both Broward County Aviation Department and Miami-Dade County Aviation Department. He was the owner and president of Hightech Engineering, Inc. for 8 years constructing lift stations and Water & Sewer projects. Education Hialeah High School 1966, High School Diploma References Miami-Dade Water & Sewer 9071 SE 38th Avenue, Miami, Florida 33165 Nelson Cepedes, Project Manager, (305) 607-0799 City of North Miami 1815 NE 150th Street, North Miami, Florida 33162 Aleem A. Ghany, PE, Public Works Director, (305) 895-9833 City of North Miami 17050 NE 19th Avenue, North Miami Beach, Florida 33162 Jimmy Davis, Construction Manager, (305) 733-4674 Dade County Public Works 111 NW 1st Street, Suite 1420, Miami, Florida 33128 Pedro Marson, County Project Manager, (305) 281-9062 12054 N.W. 98'" Avenue, Hialeah Gardens, Florida 33018 Phone: (305) 557-4226 Fax (305) 557-8568 en I- Z W ~ W > o ~ a.. ~ -w en...J ...J:=> ...Jo <(w u..J: I-u :J (1) 0 o z ~ >- 0 ~ ut=i3 z<Co: w I-- q:: C) z ~ ~ w UJ W~<i! wu ~ ...J 0 W a. ~ o ~ ~ Z I-- tn <( u UJ ...JW enJ _0 ...JD:: <(a. ~ I- Z W U co ~ UJ UJ ~ t- ~ UJ UJ .~~ ~ ~ ~ IIftI $f ~ ,'''! CD l U ~ . UJ ,'.i ~ UJ I:hlli ~ 1"'~ ~-4 .' ll) " ~ UJ .1 UJ ~ -f i I '<t nt\ ~ UJ ~ UJ ~I ~ IUI ,~~ , ('f) lw ~ UJ tl1 UJ ~ ~ ~'.~ N B \ ~ UJ ~t ' i UJ ~ . rd ~ ;i) .- It ~ UJ III UJ ~ ~I .'~ -l -l q:: a.. ~ ~ CI) ::l -l f- ~ CI) UJ Z UJ u ::i CI) UJ U CI) 0 q:: a.. UJ CI) u. 0: UJ Z UJ a f- a ::l f- q:: i= f- f- Z -l U UJ -l a -l C) Z ::l 0: q:: i= q:: UJ UJ 0: U J: ~ UJ CI) > z a.. q:: z f- Z 0: q:: f- f- UJ CI) Z a CI) z q:: a z a UJ CI) 0: 0 a u q:: a q:: CI) z i= UJ UJ a.. 0: f- UJ z i= C) C) f- 0 UJ CI) C) q:: q:: !::: ~ z q:: ::s z z ~ f- UJ ~ 0: ::l f- UJ Z CI) ;; a C) f- f- J: 0: 0: 0 a u i= -l q:: U f- co i= z q:: CI) CI) u z u 0 ~ UJ f- a a z :J X X f- CI) 0 u a -l ~ f- X UJ Z Z x z UJ ..., q:: i= -l CI) UJ UJ UJ 0: a q:: UJ 0: UJ f- f- q:: Z ::l ::l CI) q:: a 0: -l -l 0: f- U -l a a f- J: :J N a.. 0 UJ q:: q:: ::s -l -l q:: f- ~ -l f- a ::::i a.. a.. > > -l -l > q:: z UJ J: :J a.. a.. a a ::l q:: q:: a UJ -l J: q:: CI) u co a ~ ~ C) f- f- ~ 0: -l a z f- CI) CI) q:: a.. UJ a UJ J: ~ UJ UJ UJ Z Z UJ a ~ CI) -l -l ::l ~ CI) CI) N 0: 0: 0: 0: U q:: U u a.. BID BREAKDOWN PROFESSIONAL CONSTRUCTION SERVICES FOR CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS CITY OF SUNNY ISLES Item No. Item Description Quantity Unit Unit Price Price 1 MOBILIZATION LS 1,300,00 1,300.00 2. TESTING AND SURVEYING 1 LS 1,400,00 1,400.00 3 MAINTENANCE OF TRAFFIC 1 LS 1,100.00 1,100.00 4 FLOATING TURBIDITY BARRIER 50 LF 6.33 316.25 5 STAKED SILT FENCE 200 LF 6.33 1,265,00 6 ROCK BACKS 50 EA 4.60 230.00 7 SYNTHETIC BALES 20 EA 8.05 161.00 8 ASPHALTIC REMOVAL (1,5") 102 SY 3.65 371.84 9 ASPHALTIC CONCRETE (1.5") 102 SY 8,74 891.48 10 L1MEROCK BASE (6") 40 CY 41,54 1,661,52 11 TYPE B STABILIZATION (12") 80 CY 22.66 1,812.40 12 FINISH SOIL LAYER 2" 250 SY 2.07 517.50 13 REMOVAL AND DISPOSAL OF EXISTING SIDEWALK 20 SY 9.32 186.30 14 CONCRETE SIDEWALK 4" THICK 20 SY 39,10 782.00 15 TRENCH EXCAVATION 200 LF 6.33 1,265.00 16 CONCRETE CURB AND GUTTER (TYPE F) 20 LF 17.25 345,00 17 TRENCH DRAIN 12" 200 LF 161.00 32,200,00 18 CONNECT TO EXISTING DRAINAGE STRUCTURE (CORE & TIE) 1 EA 460,00 460.00 19 DISH BOTTOM INLET (TYPE C) (<10') 2 EA 1,684.75 3,369.50 20 CONTROL STRUCTURE EA 8,567.50 8,567,50 21 DRAINAGE PIPE A-2000 (24") 330 LF 60.94 20,109.71 22 28" ROUND CORE IN EXISTING SEAWALL 2.5' 1 EA 1,725.00 1,725.00 23 MANA TEE GUARD EA 621,31 621 .31 REMOVAL AND RESTORATION OF WALL TO PROVIDE 24 ACCESS TO SEAWALL LS 2,070.00 2,070,00 25 TREE REMOVAL EA 575.00 575,00 26 ST, AUGUSTINE SOD 250 SY 5.75 1,437,50 TOTAL ALL ITEMS 1$ 84,740.811 Total Project Cost Written r- '\ t:: (11 h 't 4r:'\..'r '(j.'.CC'("):'?'1.^C\ ~-:\."'Vl ~w^GLc( ~y~y u.. v- ,::..i 8i/,(0 Dollars THE AMERICAN INSTITUTE O.F ARCHITECTS I A/A Document A310 Bid Bond KNOW ALL MEN BY THESE PRESENTS, that we SOUTHEASTERN ENGINEERING CONTRACTORS, INC.. rHe'e in.e't lull n.me .nd .dd,... 0' leg.1 lille of Conrnelo,) 12054 NW 98 AVE., HIALEAB GARDENS, FL 33018 as Pnncif:!al, hereinafter called the PrinCipal, and HARTFORD FIRE INSURANCE COMPANY ONE HARTFORD PLAZA, HARTFORD, CT 06115 a corporation' duly organized under the' laws of the State of CONNECTICUT as Surety, hereinafter called the Surety, are held and firmly bound unto CITY OF SUNNY ISLES (He,e in,e,' full n.me .nd .dd,... or leg.1 rille 01 Owne,) 18070 COLLINS AVE, SUNNY ISLES, FL 33160 as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount of Bid Dollars ($ 5% l, for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for (Here inse'l lull n.me .nd .dd,e.. 0' leg.l lille of Surety) (Here insert fun name. address and descriplion of project) PROFESSIONAL CONSTRUCTION SERVICES FOR CENTRAL ISLAND EMERGENCY OUTFALLS IMPROVEMENTS NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise 10 remain in full force and effect. Signed and sealed this ~ -=:- '" (Witness) ~ '~ JrVV 24TH day of JI9X 2010 CONTRACTORS, INC (Seal) (Witness) HARTFORD FIRE I_~J RAMON A RODRI GUE~tle) .~ CE/2YMPANY c:-- (Seal) Atty-in-fact &'Fla Res Agent AlA DOCUMENT A310 . BID BOND' AlA ~. FEBRUARY 1970 ED . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 N,Y, AVE., N.W" WASHINGTON, 0, C. 20006 1 POWER OF ATTORNEY Direct Inquiries/Claims to: THE HARTFORD BOND, T-4 P.O. BOX 2103, 690 ASYLUM AVENUE HARTFORD, CONNECTICUT 06115 call: 888-266-3488 or fax: 860-757-5835 Agency Code: 21-221533 KNOW ALL PERSONS BY THESE PRESENTS THAT: [K:=J Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut [K:=J Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana [K:=J Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut c=:J Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut c=:J Twin City Fire Insurance Company, a corporation duly organized under the laws of the State ofIndiana c=:J Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois c=:J Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State ofIndiana c=:J Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: Emesto Freyre, Fausto Alvarez, Ramon A. Rodriguez, Victor M. Pantin, Carl H. Moll, Carlos Lacasa, William E. Beckham, Marc O. Jacobson, Michael L. Keeby, Mayra Rodriguez of Miami, FL their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by [ZI, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on July 21, 2003 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. U}"~IlI"'''''",. ..-" to"..""'" ~?~:~ \~r~jj} ~..~~~,;;~~.r-;~~~ ;.~.!' "1f~1...... ~~ ~ /'.>;',;.-.~~.\ I~ !!l ~"'al.~'(g\'" ~ !;: ~c.O~rro ...~. ~ ~ \ " . j; ~ i~ \ * Sf ;.....lP79/IU \~ 19~~Wi \ , .....-"" "'~, -"1-- ~~ .~~.$ f~O 0\. ~ r'\ I(\,(~ \, \, "--.J ' ,~ ~,~'~'s"r-- Paul A. Bergenholtz, Assistant Secretary David T. Akers, Assistant Vice President STATE OF CONNECTICUT} 55. Hartford COUNTY OF HARTFORD On this 4th day of August, 2004, before me personally came David T. Akers, to me known, who being by me duly sworn, did depose and say: that he resides in the County of Hampden, Commonwealth of Massachusetts; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. ')/) hc.Agf/~ CERTIFICATE Scott E. Paseka Notary Public My Commission Expires October 31, 2007 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of September 24, 2010. Signed and sealed at the City of Hartford. ,~;~Il"~;;;:~~ ~/$"'~.""~~ =-, (:Otl:1'Ollc" o~ ;Ql'" ~ -\ l;~~~'~:'~2.~:~Y ~.",~~~t,:!.o..\~\"'"'''' ,~;:;,... ~ 1~~Y.".~~~\ t~^Rf>QfU~ ~ . J ~eOIl:'O'A"t: . .. :: hJ ~tD~rrD'" ~il~ * qj;~ {~~. B~ ,..:..lP79,"~1 ',~ J9~9 W ..~.>..........:,~.l '~~~;\., €I '~DIl'''_....'''' "'Z."LOntO. -;...' ...,.....,....-- -..._~.._..." ,(~~"-ll.L ,~;b~",- 1'- ./ . ( ;') I , ".... L Gary W. Stumper, Assistant Vice President POA 2004 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. Financial Statements and Independent Accountants' Review Report June 30, 2009 and 2008 .J. LABRADOR, P ,A, CERTIFIE::J PUBLIC ACCOUNTANTS Suite 302 85 Grand Canal Drive Miami, Florida 33144 JL ~j~:A"m.. ~-.o.:K~_ ....0, TEL. (305) 262-1600 FAX (305) 262-1601 E-mail: info@labrador-cpa.com www.labrador-cpa.com MEMBERS: AMERICAN & FLORIDA INSTITUTES OF CERTIFIED PUBLIC ACCOUNTANTS NATIONAL ASSOCIATION OF CERTIFIED VAlliATION ANAl YSTS "INDEPENDENT ACCOUNTANTS' REVIEW REPORT" To the Stockholders SOUTHEASTERN ENGINEERING CONTRACTORS, INC. We have reviewed the accompanying balance sheets of SOUTHEASTERN ENGINEERING CONTRACTORS, INC. as of June 30, 2009 and 2008 and the related statements of income and retained earnings and cash flows for the six months then ended, in accordance with Statements on Standards for Accounting and Review Services issued by the American Institute of Certified Public Accountants. All information included in these financial statements is the representation of the management of SOUTHEASTERN ENGINEERING CONTRACTORS, INC. A review consists principally of inquiries of company personnel and analytical procedures applied to financial data. It is substantially less in scope than an examination in accordance with generally accepted auditing standards, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opmlOn. Based on our review, we are not aware of any material modifications that should be made to the accompanying financial statements in order for them to be in conformity with generally accepted accounting principles. Our review was made for the purpose of expressing limited assurance that there are no material modifications that should be made to the financial statements in order for them to be in conformity with generally accepted accounting principles. The information contained on the schedules of earnings from contracts, completed contracts, contracts in progress and general and . administrative expenses is presented only for supplementary analysis purposes. Such information has been subjected to the same inquiry and analysis procedures applied in the review of the basic financial statements and we are not aware of any material modifications that should be made to them. ql,~ / // /1 I / Septemher 21, 2009 , I / Miami}'Florida /J/ ,~ ff-- .I 2 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. BALANCE SHEETS JUNE 30, ASSETS 2009 2008 CURRENT ASSETS Cash and cash equivalents $ 2,875,221 $ 1,019,660 Contracts receivable 7,364,618 6,083,254 Costs and estimated earnings in excess of billings on uncompleted contracts 115,913 Total current assets 10,239,839 7,218,827 PROPERTY AND EQillPMENT - NET 876,804 808,392 OTHER ASSETS 14,557 13,101 $ 11,131,200 $ 8,040,320 LIABILITIES AND STOCKHOLDERS' EQUITY CURRENT LIABILITIES Short-term borrowings $ $ 136,972 Current portion of long-term debt 181,435 165,245 Accounts payable - trade 1,594,741 1,771,742 Accrued expenses 12,396 29,565 Billings in excess of costs and estimated earnings on uncompleted contracts 4,477,102 2,913,776 Total current liabilities 6,265,674 5,017,300 LONG - TERM DEBT 286,100 168,866 DUE TO STOCKHOLDERS 200,000 200,000 STOCKHOLDERS' EQillTY Common stock - 50 shares of $10 par value authorized, issued and outstanding 500 500 Paid-in capital in excess of par 69,000 69,000 Retained earnings 4,309,926 2,584,654 4,379,426 2,654,154 $ 11,131,200 $ 8,040,320 Read Accountants' Review Report The accompanying notes are an integral part of this statement 3 - SOUTHEASTERN ENGINEERING CONTRACTORS, INC. STATEMENTS OF INCOME AND RETAINED EARNINGS FOR THE SIX MONTHS ENDED JUNE 30, 2009 2008 Contract revenues earned $ 10,226,909 $ 7,260,004 Cost of revenues earned 8,400,761 5,804,810 Gross profit 1,826,148 1,455,194 General and administrative expenses 924,294 763,189 Income from operations 901,854 692,005 Other income and (expenses) Gain on sale of asset 29,000 Interest income 5,037 9,370 Interest expense (22,205) (59,148) Net Income 913,686 642,227 Retained earnings at the beginning of the year 3,609,540 1,942,427 Dividend distributions (213,300) Retained earnings at the end of the six months $ 4,309,926 $ 2,584,654 Read Accountants' Review Report The accompanying notes are an integral part of this statement 4 - SOUTHEASTERN ENGINEERING CONTRACTORS, INC. STATEMENTS OF CASH FLOWS FOR THE SIX MONTHS ENDED JUNE 30, 2009 2008 Cash flows from operating activities: Net Income $ 913,686 $ 642,227 Adjustments to reconcile net income to cash provided by operating activities: Depreciation 108,147 129,599 Gain on sale of assets (29,000) Changes in assets and liabilities: Decrease (increase) in contracts receivable (567,506) 74,025 Decrease (increase) in costs and estimated earnings in excess of billings on uncompleted contracts 222,970 (71,061) Increase in other assets (1,636) Decrease in accounts payable - trade (737,870) (179,596) Increase (decrease) in accrued expenses (5,366) 20,830 Increase in billings in excess of costs and estimated earnings on uncompleted contracts 1,235,634 113,070 Cash flows provided by operating activities 1,140,695 727,458 Cash flows provided by (used in) investing activities: Proceeds from sale of assets 29,000 Purchase of property and equipment (255) 28,745 Cash flows used in financing activities: Repayment to stockholders (197,000) Repayment of short-term borrowings (99,425) Dividend distributions (213,300) Repayment of long-term debt (116,113) (120,491) (329,413) (416,916) Net increase in cash and cash equivalents 840,027 310,542 Cash and cash equivalents at the begilli1ing of the year 2,035,194 709,118 Cash and cash equivalents at the end of the six months $ 2,875,221 $ 1,019,660 Supplementary disclosure of cash flows information Non-monetary investing and financing transactions: Debt incurred to acquire property and equipment Cash paid for interest $ $ 112,039 22,205 $ 114,725 $ 59,148 Read Accountants' Review Report The accompanying notes are an integral part of this statement 5 .- SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 1 - SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES General The Company was incorporated under the laws of the State of Florida and began operations in June, 1984. The Company was created for the purpose of performing general construction contracts. The work is normally performed under fixed-price contracts. All projects are located in the South Florida area. Use of estimates The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial statements and the reported amounts of revenues and expenses during the reporting period. Actual results could differ from those estimates. Revenue recognition Contract revenue is recognized using the percentage-of-comp1etion method. Under this method, the percentage of contract revenue to be recognized currently is computed as that percentage of estimated total revenue that incurred costs to date bear to total estimated costs, after giving effect to the most recent estimates of cost to complete. It is reasonably possible that changes in estimates may occur in the near term, Revisions in cost and revenue estimates are reflected in the period in which the facts which require the revision become known. When the revised cost estimates indicate a loss on an individual contract, the total estimated loss is provided for currently in it::; entirety without regard to the percentage of completion. Contract costs include all direct material, labor, subcontractor costs and those indirect costs related to contract performance, such as indirect labor, supplies, equipment rental, and repairs. Selling, general, and administrative expenses are charged to operations as incurred. The asset "cost and estimated earnings in excess of billings on uncompleted contracts", represents revenues recognized in excess of amounts billed. The liability, "billings in excess of costs and estimated earnings on uncompleted contracts", represents billings in excess of revenues recognized. Depreciation Depreciation is provided for on the straight-line method over the eSTimated useful lives of the assets. Cash and cash equivalents For the purpose of reporting cash flows, the Company has defined cash equivalents as those highly liquid investments purchased with an original maturity of three months or less. 6 .... SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 1- SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES - CONTINUED Income Taxes The Company uses the percentage-of-completion method of reporting income from long- term construction contracts for financial statements purposes and the completed contract method for income tax purposes. The Company has elected, with the consent of its stockholders, to be taxed as an S corporation under the provisions of Section 1362 of the Internal Revenue Code and state laws. Under these provisions, the Company does not pay federal or state income taxes on its taxable income. Instead the stockholders are liable for individual income taxes on their respective share of the Company's income. Long-Lived Assets Long-lived assets, such as property and equipment, are reviewed on an ongoing basis for impairment based on comparison of carrying value against undiscounted future cash flows. If impairment is identified, the assets carrying amounts are adjusted to fair value. There were no such adjustments during the six months ended June 30, 2009 and 2008. NOTE2-CONTRACTSRECEIVABLE . Contracts receivable are as follows: 2009 2008 Billed Completed contracts Due Contracts in progress Due Retainage $ 393,592 $ 479,137 3,887,684 3,083,342 $ 7,364,618 3,155,153 2,448,964 $ 6,083,254 Contracts receivable as of June 30, 2009 are aged as follows: 0- 30 days $ 2,243,128 31- 60 days 920,461 61 - 90 days 317,477 Over 91 days 800,010 Retainage 3,083,342 $ 7,364,618 The Company collected approximately $ 3,400,000 of the receivables through September 21,2009. 7 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCiAL STATEMENTS -- NOTE 3 - COSTS AND ESTIMATED EARNINGS ON UNCOMPLETED CONTRACTS Costs incurred on uncompleted contracts Estimated earnings 2009 $ 29,429,865 5,779,166 35,209,031 (39,686,133) $ (4,477,102) Less: billings to date Costs and estimated earnings in excess of billings on uncompleted contracts Billings in excess of costs and estimated earnings on uncompleted contracts $ (4,477,102) $ (4,477,102) NOTE 4 - BACKLOG 2008 $ 19,485,216 3,736,798 23,222,014 (26,019,877) $ (2,797,863) $ 115,913 (2,913,776) $ (2,797,863) The following is a reconciliation of backlog representing signed contracts in existence as of June 30: Balance at the beginning of the year Contracts and adjustments 2009 $ 53,937,241 (205,354) 53,731,887 (10,226,909) $ 43,504,978 Less: contract revenues earned for six months Balance at the end of the six months 2008 . $ 16,052,605 5,365,372 21,417,977 (7,260,004) $ 14,157,973 The Company assures that all contract cost pertaining to the financial statements for the six months ended June 30, 2009 have been included. NOTE 5 - CONCENTRATION OF CREDIT RISK The Company maintains its cash balances in a financial institution in Miami, Florida. The balances are insured by the Federal Deposit Insurance Corporation up to $100,000. Temporary additional protection of $150,000 has been extended by the FDIC through December 31,2009. These balances may at times exceed insured limits. The Company as of June 30, 2009, had 98 % of their receivables with four customers. The Company as of June 30, 2008, had 82 % of their receivables with two customers. . 8 SOlJTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 6 - MAJOR CUSTOMERS The Company earned revenues during the six months ended June 30, 2009 from five customers that individually accounted for more than 10% of the total revenues earned during the six months. Revenues earned from these customers amounted to $ 2,626,813, $ 1,936,792, $ 1,801,049, $ 1,702,548 and $ 1,346,987. The Company earned revenues during the six months ended June 30, 2008 from three customers that individually accounted for more than 10% of the total revenues earned during . the six months. Revenues earned from these customers amounted to $ 4,351,500, $ 1,497,513 and $ 946,756. NOTE 7 - PROPERTY AND EQUIPMENT Depreciation for the six months ended June 30, 2009 and 2008 was $ 108,147 and $ 129,599, respectively. Costs, accumulated depreciation and estimated useful lives as of June 30, are as follows: Estimated Category useful lives 2009 2008 Auto and trucks 5 Years $ 647,093 $ 495,146 Heavy equipment 7 Years 2,349,430 2,659,033 Furniture and fixtures 7 Years 57,371 57,371 Leasehold improvements 39 Years 44,621 44,621 3,098,515 3,256,171 Less: accumulated depreciation (2,221,711) (2,447,779) $ 876,804 $ 808,392 NOTE 8 - RELATED PARTY TRANSACTIONS The Company leases administrative offices, storage space and a parking facility from the Company's stockholders. The lease terms are on a month to month basis and rental payments made for the six months ended June 30, 2009 and 2008 were $ 128,244 and $ 65,453 respectively. The Company's stockholders have lent $ 200,000 to the Company under an unsecured note payable with a due date of July 15,2010. The Company and these related parties mentioned above are not considered variable interest entities under F ASB Interpretation 46R - Consolidation of Variable Interest Entities. Accordingly, the accompanying [mancial statements have not been consolidated with these related companies. . 9 SOUTHEASTERN ENGINEERING CONTRACTORS, INC. NOTES TO THE FINANCIAL STATEMENTS NOTE 9 - LONG-TERM DEBT The Company's long-term debt consists of the following: 2008 Equipment and vehicle loans payable in monthly installments ranging from $ 383 to $ 3,759 including interest at rates of2.90 % to 14.94 % and maturity dates from October 2009 to November 2013. $ 467,535 (181,435) $ 286,100 $ 334,111 (165,245) $ 168,866 Less: current portion Future principal payments of these notes will be as follows: Year Amount 2010 $ 181,435 2011 136,234 2012 97,793 2013 44,414 2014 7,659 $ 467,535 NOTE 10 - LINE OF CREDIT The Company has secured with assets held by the stockholders a line of credit of $ ] ,500,000 bearing interest of prime rate minus .25 %, and maturing upon demand. As of June 30, 2009; there was zero balance due by the Company under the line of credit. NOTE 11 - ASSIGNMENT OF RIGHTS AND PROPERTY UNDER INDEMNITY AGREEMENT In order to procure a bonding line, the Company has assigned certain rights and property as collateral to secure its obligations under the indemnity agreement. These rights consist principally of rights under construction contracts, subcontracts, insurance policies and legal claims. The property assigned consists of all property and equipment, cash and accounts receivable. 10 .. BEO&ll ~rown . ~ III 2500 N.W. 79th Avenue · Suite 101 · Miami, Florida 33122 Mailing Address: P.O. Box 523615. Miami, Florida 33152-8988 305-714-4400 · Fax: 305-714-4401 · www.hbains.com November 2,2010 CITY OF SUNNY ISLES BEACH 18070 COLLINS AVENUE SUNNY ISLES BEACH, FL 33160 RE: SOUTHEASTERN ENGINEERING CONTRACTORS, INC. BOND NO. 21BCSFW4198 To Whom It May Concern: Let this letter serve as authorization from the Hartford Fire Insurance Company. permitting CITY OF SUNNY ISLES BEACH to date the Bond at the same time the county signs the contract. If you should have any questions, please do not hesitate to contact our office. Bes~ - ......-.---.. Ramon A Rodriguez Attorney-in-Fact for Hartford Fire Insurance Co. RE: DUPLICATE ORIGINAL BOND FILINGS IN FLORIDA Florida Statute 255.05 requires that a contractor who enters into a contract with a PUBLIC ENTITY IN THE STATE OF Florida must provide Performance and Payment Bonds for the project and record the bonds in the public records of the County where the improvement is located. When the contract is with a PRIV ATE ENTITY (Florida Statute 713.23) the responsibility of the filing the bond falls with the Owner; however, we strongly recommend that the contractors do the filing themselves in order to be sure they are protected. Therefore, we are enclosing a duplicate original set of bonds, which need to be filed with the Clerk of the Circuit Court in the County where the project is located in accordance with Florida Statutes 244.05 or 713.23. Bond Number: 21 BCSFW 4198 This is the first page of Performance and Payment Bond. All other pages are subsequent regardless of preprinted pages. Surety in Which Bond is Written: HARTFORD FIRE INSURANCE COMPANY Local Address: 400 INTERNATIONAL P ARKW A Y, SUITE 425 HEATHROW, FL 32746 (407) 562-3487 CONTRACTOR'S NAME: SOUTHEASTERN ENGINEERING CONTRACTORS, INC. Address: 12054 N.W. 98 AVENUE HIALEAH GARDENS, FL 33018 Telephone No. (305) 557-4226 Owner/Obligee: CITY OF SUNNY ISLES BEACH 18070 COLLINS AVE SUNNY ISLES BEACH, FL 33160 Project Description: CENTRAL ISLAND EMERGENCY OUTFALL RFP 10-08-01 Contract Amount: $ 84,740.81 Bond Amount: $ 84,740.81 This bond has been furnished to comply with the requirements ofF.S. 255.05. All provisions and limitations including conditions, notice and time limitations ofF.S. 255.05 are incorporated herein by reference. This bond is a statutory bond not a common law bond. For Bond Inquiries: Agency: HBA INSURANCE GROUP, INC. (305) 714-4400 x FLORIDA NOTICE FLORIDA HURRICANE CATASTROPHE FUND EMERGENCY ASSESSMENT The Florida Office of Insurance Regulation has levied an emergency assessment on direct written premiums for all property and casualty lines of business in Florida. This emergency assessment is to fund obligations, costs and expenses of the Florida Hurricane Catastrophe Fund and the Florida Hurricane Catastrophe Fund Corporation. This emergency assessment is 1.3%, and applies to all subject policies and bonds effective on or after January 1, 2011. We are required by statute and order to collect this emergency assessment and remit it to the State. This assessment for your policy or bond appears as FHCF EMER ASSESS CL. Form .IFL4887 HR 09 H085 00 0806 Page 1 of 1 @ 2006, The Hartford Producer Compensation Notice V THE tl HARTFORD You can review and obtain information on The Hartford's producer compensation practices at www.thehartford.com or at 1-800-592-5717. HR 00 H093 00 0207 @ 2007, The Hartford Page 1 of 1 21BCSFW4198 AlA Document A312 - Electronic Format Performance Bond TillS DOCUMENT liAS IMPORTANT lEGAL CONSEQUENCES: CONSULT..\T10N WITII AN :\TTORNEY is ENCOURAGED WiTII RESPECT TO ITS COMPLETION OR MODlFICA TION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED All'. DOCUlvlENT MAYBE MADE BY USING AlA DOCUMENT D401. Any singular referencc to Contract. Surety, O\\l1Cr or Othcr Party Shall be considcrcd plural whcrc applicable. CONTRACTOR (Name and Address): Southeastern Engineering Contractors, Inc., 12054 N.W. 98th Avenue Hialeah Gardens, FL 33016 OWNER (Name and Address) CITY OF SUNNY ISLES BEACH 18070 Collins Avenue Sunny isles Beach, FL 33160 CONSTRUCTION CONTRACT Date: Amount Eighty-Four Thousand Seven Hundred Forty and 81/100 ($84,740.81) Description (Name and Location): Central Island Emergency Outfall RFP10-08-01 SURETY (Name and Principal Place of Business) Hartford Fire Insurance Company One Hartford Plaza Hartford, CT 06155 BOND Date (Not earlier than Construction Contract Date): November 2, 2010 Amount Eighty-Four Thousand Seven Hundred Forty and 81/100 ($84,740.81) Modifications to this Bond: D None EJ See Page CONTRACTOR AS PRINCIPAL Company: Southeastern SURETY Company: (Corporate Seal) Hartford Fire Insurance Company ......~~~~ Signature:-" ...~ Name and Titlc: Ramon.A. Rodriguez. Attorney-in-Fact & Fla Res Agent AGENT or BROKER: HBA INSURANCE GROUP 2500 NW 79 AVENUE SUITE 101 MIAMI,Florida 33122 305-714-4400 1 The Contractor and the Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference. OWNER'S REPRESENT A TIVE (Architect, Engineer or other party): n/a n/a 3 If there is no Owner Default, the Surety's obligation under this Bond shall arise after: 2 If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except to participate in conferences as provided in Subparagraph 3.1. 3.1 The Owner has notified the Contractor and the Surety at its address described in Paragraph 10 below that the Owner is considering declaring a Contractor Default and has requested and attempted to arrange a conference with the Contractor and the Surety to be held not later than fifteen days after receipt of such notice to discuss methods of performing the Construction Contract. If the Owner, the Contractor and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction AIA DOCU!-1ENT' A31.2. PER.FORi,t;'NCE BOND AND PAYt'-1ENT BOND . DECEt"lBER 1984 ED. . AJ~o. ,"~. TEE Ar.1ERICAN INSTITUTE OF l\RCHITECTS, 1735 NE~': YORK [..VENUE, N.:'i. / ~'i]\SHINGTON, D.C., 20006-5292 . THIRD PRINTING. !"ll..RCH 1987. ~AlJ1RNINGi Unlicensed photocopyi~g violates U.S. copyright laws and is subjec~ to legal prosecution. This doeumcnt has bccn reproduccd clectronically with the' pennission of Thc Amcrican Institutc of Architects undcr Liccnse #210.. to Thc Hartford Fiddity and Bonding Comp~ny. Reproduction of this document without project-specific inlimnation is not permittcd. Contact Thc ;\merican Institute of Architcct, to verify thc current version of this document and license status. Elect~onic Format A312-1984 1 Contract, but such an agreement shall not waive the Owner's right, if any, subsequently to declare a Contractor Default; and 3.2 The Owner has declared a Contractor Default and formally terminated the Contractor's right 10 complete the contract. Such Contractor Default shall not be declared earlier than twenty days after the Contractor and the Surety have received notice as provided in Sub-paragraph 3.1; and 3.3 The Owner has agreed to pay the Balance of the Contract Price to the Surety in accordance with the terms of the Construction Contract or to a contractor selected to perform the Construction Contract in accordance with the terms of the contract with the Owner. 4 When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the Surety's expense take one of the following actions: 4.1 Arrange for the Contractor, with consent of the Owner, to perform and complete the Construction Contract; or 4.2 Undertake to perform and complete the Construction Contract itself, through its agents or through independent contractors; or 4.3 Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and the contractor selected with the Owner's concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 6 in excess of the Balance of the Contract Price incurred by the Owner resulting from the Contractor's default; or 4.4 Waive its right to perform and complete, arrange for completion, or obtain a new contractor and with reasonable promptness under the circumstances: .1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, tender payment therefor to the Owner; or .2 Deny liability in whole or in part and notify the Owner citing reasons therefor. 21BCSFW4198 5 If the Surety does not proceed as provided in Paragraph 4 with reasonable promptness, the Surety shall be deemed to be in default on this Bond fifteen days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perfom1 its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Subparagraph 4.4, and the Owner refuses the payment tendered or the Surety has denied liability, in whole or in part, without further notice the Owner shall be entitled to enforce any remedy available to the Owner. 6 After the Owner has terminated the Contractor's right to complete the Construction Contract, and if the Surety elects to act under Subparagraph 4.1, 4.2, or 4.3 above, then the responsibilities of the Surety to the Owner shall not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety shall not be greater than those of the Owner under the Construction Contract. To the limit of the amount of this Bond, but subject to commitment by the Owner of the Balance of the Contract Price to mitigation of costs and damages on the Construction Contract, the Surety is obligated without duplication for: 6.1 The responsibilities of the Contractor for correction of defective work and completion of the Construction Contract; 6.2 Additional legal, design professional and delay costs resulting from the Contractor's Default, and resulting from the actions or failure to act of the Surety under Paragraph 4; and 6.3 Liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor. 7 The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price shall not be reduced or set off on account of any such unrelated obligations. No right of action shall accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators or successors. 8 The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders and other obligations. 9 Any proceeding, legal or equitable, under this Bond may be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and AlA DOCUW<:NT JI.312. PERFORIviANCE BOND AND PAyt':ENT BOND . DECE,.,BER 1984 ED. . AlA ~). TEE A!'~ERlCJI.N INSTITUTE OF l\RCHITECTS, 1735 NE~'; YORK !\\:'"ENUE. 1'J.~':', VF\SHINGTON, D,C., 20006-5292 . THIRD PRINTING. !"'ll\RCH 1987. \AJARNINGi Unlicensed photocopying violates u.s. copyright laws aI:d is subjec: to legal prosecution. This documcnt has becn reproduecd electronically with thc permission of Thc Amcrican Institnte of Architects under Liccnse #2104 to The Hartford Fidelity and Bondiug Company. Reproduction of this docnment without projcet-spceitic intimnation is not permitted. Contact The American Institute of Architcets to verify the cun'cnt version or this document and license statll~. Electronic Format A312-1984 2 21BCSFW4198 shall be instituted within two years after Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this Paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall be applicable. been made, including allowance to the Contractor of any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract. 10 Notice to the Surety, the Owner or the Contractor shall be mailed or delivered to the address shown on the signature page. 12.2 Construction Contract: The agreement belween the Owner and the Contractor identified on the signature page, including all Contract Documents and changes thereto. 11 When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted here from and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein. The intent is that this Bond shall be construed as a statutory bond and not as a common law bond. 12.3 Contractor Default: Failure of the Contractor, which has neither been remedied nor waived, to perform or otherwise to comply with the terms of the Construction Contract. 12 DEFINITIONS 12.4 Owner Default: Failure of the Owner, which has neither been remedied nor waived, to pay the Contractor as required by the Construction Contract or to perform and complete or comply with the other terms thereof. 12.1 Balance of the Contract Price: The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have MODIFICATIONS TO THIS BOND ARE AS FOllOWS: None (Space is provided below for additional signatures of added parties, other than those appearing on the cover page.) CONTRACTOR AS PRINCIPAL Company: (Corporate Seal) SURETY Company: (Corporate Seal) Signature: Name and Title: Address: Signature: Name and Title: Address: All', DCCU!~ENT A312. PERFCR~!ANCE BOND AND PAyt.mNT BOND . DECEt'1BER }9B4 ED. . .!;IA ~). THE .'.YEP-TCfI.N INSTITUTE OF J\RCHTTECTS, J.735 NE~'J YORK !..VENUE, 1'J.~';' I \';l\SHINGTON, D.C" 20006-5292 . THIRD PRINTING . !~iI...RCH :198.7. ~"JARNING; Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. This documcnt has been rcproduecd electronically with thc permission of Thc Amcriean Institutc of Architects undcr Liecnse 1i2104 to The Hartfi.\rd Fidelity and Bonding Company. Reproductiou of this document without projcct-spccific inf(Jrlnation is nol permittcd. Ce,nlact Thc Amcrican Institute of Architccts to verify thc clIn-cnt version of this document and license status. Electronic Format A312-1984 3 THE AMERICAN INSTITUTE OF ARCHITECTS . Bond No. 21BCSFW4198 AlA Document A3/1 Labor.and M_aterial Payment Bond THIS BOND IS ISSUED SIMUL TANEOUSLYWITH PERFORMANCE BOND IN FAVOR OF THE OWNER CONDITIONED ON THE FULL AND FAITHFUL PERFORMANCE OF THE CONTRACT KNOW ALL MEN BY THESE PRESENTS: that SOUTHEASTERN ENG INEERING CONTRACTORS, INcO:aro Insert lull nama and address or legal lilt. 01 Conlra<lor) 12054 NW 98 AVE., HIALEAH GARDENS, FL 33018 as Principal, hereinafter catled Principal, and, HARTFORD FIRE INSURANCE COMPANY ONE HARTFORD, CT 06155 as Surety, hereinafter called Surely, are held and firmly bound unto CITY OF SUNNY I SLES BEACH (Herelnoortlull name and address orlegal 11110 01 Ownor) 18070 COLLINS AVE, SUNNY ISLES BEACH, FL 33160 as Obligee, hereinafter oalled Owner. for the use and benefit of claimants as hereinbelow defined, In the EIGHTY FOUR THOUSAND SEVEN HUNDRED FORTY AND 81/100 amount of (Here Inserlll sum equal to III lellsl one-hair of the conlract price) (Hara lnsort full name nnd nddr~.s or legalli\1e of Suroty) Dollars ($ 84,740.81 for the payment whereof PrIncipal and Surety bind themselves. their I.eirs, executors, successors and assigns, jointly and severally, firmly by these presents. ), administrators, WHEREAS, Principal has by written agreement dated for (Herolnsort rull nama, .dd,as. snd de.c~ption of proJact) , entered into a contract with Owner CENTRAL ISLAND EMERGENCY OUTFALL RFP 10-08-:-01 In accordance with Drawings and Speclncations prepared by N/A (Hora Insert (ull nama end addrsss or legalllU. of Archl1sCI) which contract is by reference made a part hereof, and is hereinafter referred to as the Contract. NA DOCUMENT AJ11 ' PERFORMANCE BONO ANa lABOR AND MATERIAl PAYMENT BOND . AlA <(i) FEBRUARY 1870 ED. . THE AMERICAN INSTITUTE OFARCKITECTS. 1735 N.Y. AVE., N.W., WASHINGTON, D.C. 20006 1 LABOR AND MATERIAL PAYMENT BOND NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that, if Principal shall promptly make payment to all claimants as hereinafter defined, for all labor and material used or reasonably required for use in the performance of the Contract, then this obligation shall be void, otherwise it shall remain in full force and elfect, subject, however, to the 10llowing conditions: 1. A claimant is defined as one having a direct contract with the Principal or with a Subcontractor of the Principal for labor, material. or both, used or reasonably requIred for use in the performance of the Contract, labor and material being construed to include that part of water, gas, power, light, heat, oil, gasoline, telephone selVice or Urental of equipment directly applicable to the Contract. 2. The above named Principal and Surety hereby jointly and severally agree with the Owner that every claimant as herein defined, who has not been paid in full before the expiration of a period of ninety (90) days after the date on which the last of such claimant's work or labor was done or performed, or materials were Furnished by such clalmant, may sue on this bond fOL ,the use of such claimant, prosecute the suit to final Judgment for such sum or sums as may be justly due claimant, and have execution thereon. The owner shall not be liable for the payment of any costs or expenses of any such .suit. 3. No suit or action shall be commenced hereunder by any claimant: a) Unless claimant, other than one having a direct contract with the Principal, shall have given written notice to any two of the following: the Principal, the Owner, or the Surety above named, within ninety (90) days after such claimant did or performed the last of the work or labor, or furnished the last of the materIals for which said claim is made, staling with substantial accuracy the amount claimed Signed and sealed this 2ND A'U ) ~ V'<~ ~, . (Nltness) ~ WITNESS: I \~f\J~ B ; v u Jl, ,I \ ('vVifn6$$) and the name of the party to whom the materials were furnished, or for whom the work or labor was done or performed. Such notice shall be selVed by mailing the same by registered mail or certifie<l mail, postage prepaid, In an envelope addressed to the Principal, Owner or Surety, at any place where an office is regularly mainlained for the transaction of business, or selVed in any manner In which legal process may be salVed in the state in which the aforesaid project is located, save that such seNics need not be made by a public officer. b) After the expiration of one (1) year following the date on which principal ceased Work on said Contract, it being understood, however, that If any limitation embodied in this bo.nd Is prohibited by any law controlling the construction hereof such limitation shall be deemed to be amended so as to be equal to the minimum period of limitation permitted by such law. e) Other than in state court of competent jurisdiction in and for the county or other political subdivision of the state in which the Project, or any part thereof, is situated, or in the United States District Court for the district In which the Project, or any part thereof, is situated, and not elsewhere. 4. The amount of this bond shall be reduced by and to the extent of any payment or payments made in good faith hereunder, inclusive of the payment by Surety or mechanics' liens which may be filed of record against said improvement, whether or not claim for the amount of such lien be presented under and agaInst this bond. day of NOVEMBER, 2010 RS ,INe (Sean J HARTFORD FIRE (8::U 1 BY~~- RAMON A RODRI~~ Attorney-in-Facl & FLA RES AGENT AlA DOCUMENT A311 . PERFORMANCE BOND AND LABOR AND MATERIAL PAYMENT BONO . AlA eEl FEBRUARY 1970 EO. . THE MIERICAN INSTIWTE OF ARCHITECTS, 1736 N.Y. AVE" N'w, WASHINGTON, D.C. 20006 2 HARTFORD FIRE INSURANCE COMPANY Hartford, Connecticut Financial Statement, December 31, 2009 (Statutory Basis) ASSETS LIABILITIES u.s. Government Bonds ....... $ 368,756,707 Reserve for Claims $ Bonds of Other Governments 136,326,951 and Claim Expense............ 7,008,536,044 State, County Municipal Reserve for Unearned Premiums 1,991,334,544 Miscellaneous Bonds.. 12,724,600,391 Reserve for Taxes, License Stocks ..................... 5,385,500,208 and Fees ......................... 63,462,631 Short Term Investments ....... 326,369,173 Miscellaneous Liabilities ............ 2,289,376,393 $ 18,941,553,430 Total Liabilities ....................... $ 11,352,709,612 Real Estate ................................... $ 135,059,043 Capital Paid In $ 54,740,000 Cash ........................................... 135,120,953 Surplus ... ...... 13,135,478,819 Agents' Balances (Under 90 Day) ...... 2,645,588,209 Other Invested Assets......... ............ 426,558,272 Surplus as regards Policyholders........... $ 13,190,218,819 Miscellaneous ............ ......... .......... 2,259,048,524 Total Liabilities, Capital Total Admitted Assets ................... $ 24,542,928,431 and Surplus ................................. $ 24,542,928,431 STATE OF CONNECTICUT COUNTY OF HARTFORD CITY OF HARTFORD }ss Debora G. Westcott, Assistant Vice President, and Patricia A. Murrone, Assistant Secretary of the Hartford Fire Insurance Company, being duly sworn, each deposes and say that the foregoing is a true and correct statement of the said company's financial condition as of December 31,2009. Subscribed and sworn to before me this 29th day of March, 2010. Brenda M. Cunningh m Notary Public My Commission Expires July 31,2010 .~w-.. tt, Assistant Vice President 'P~ A ~ Patricia A. Murrone, Assistant Secretary Form CS-19-37 HF printed in U.S.A. Direct Inquiries/Claims to: POWER OF ATTORNEY THE HARTFORD BOND, T-4 P.O. BOX 2103, 690 ASYLUM AVENUE HARTFORD, CONNECTICUT 06115 call. 888-266-3488 or fax: 860-757 -5835) Agency Code: 21 221533 KNOW ALL PERSONS BY THESE PRESENTS THAT: ~ Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut D Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana D Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut D Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut D Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana D Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois D Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State ofIndiana D Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of UNLIMI TED ERNESTO FREYRE, FAUSTO ALVAREZ, RAMON A. RODRIGUEZ, VICTOR M. PANTIN, CARL H. MOLL, CARLOS LACASA, WILLIAM E. BECKHAM, MARC D. JACOBSON, MICHAEL L. KEEBY, MAYRA RODRIGUEZ OF MIAMI, FLORIDA their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by [8], and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on January 22, 2004, the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. t!2'''''~ ~" (q~.. .~ .--.. .~4!.. \;\ t(J*1fb ~, \:...;~~_. .$'1 '\>~".~~ ..../~.....rf / /,l.:t.;:{t:>"f 4j;;"~~'~'/ l_.S re~ Scott Sadowsky, Assistant Secretary M. Ross Fisher, Assistant Vice President STATE OF CONNECTICUT} 55. COUNTY OF HARTFORD On this 3'd day of March, 2008, before me personally came M. Ross Fisher, to me known. who being by me duly sworn, did depose and say: that he resides in the County of Hartford, State of Connecticut; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporale seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. J/'/;;s~<?:;~ Dc;fOr /1- .t~. ~ Scott E. Paseka Notary Public My Commission Expires October 31, 2012 Hartford CERTIFICATE I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies. which is still in full force effective as of November 2, 2010 Signed and sealed at the City of Hartford. tff;.r.t'~~~ ..~.. ~ ~ .;~'!. !:\ · JEt ""\"':.;....19 7 ~ .l,ll ~""::~ ;;~.;;~.y ,,~. ~~ ;~! -.p-:I.tt'CQ\:'} h.\IP1~/i1 \.... ~''''-- l:' I ~~ /' 'I. lo"'. .~DjjS:;l:"~: /,...,'" ! ( . I I :/ v Gary W. Stumper, Assistant Vice President POA 2008 Preview Page 1 of 1 City of SUDJ.1Y Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947-0606 City Hall (305) 949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission FROM: Rick Conner, City Manager DATE: 10/14/2010 RE: Award of Bid for the Construction of Central Island Drainage Phase IV RECOMMENDATION: Staff recommends that the Comission approve the Resolution awarding the contract for the Central Island Drainage Phase IV to Southeastern Engineering in an amount not to exceed $84,740.81. REASONS: This is the portion of the Central Island Drainage Project that will enhance the drainage on North Bay Road both at the School and south of the School. The work will be in front of the Eden Rock Condominium and will include a direct outfall to the bay. The permits have been obtained and the contractor is ready to go to work. We will include liquidated damages in the contract. We also believe that we can reduce the final cost of the project, but need to move forward to get the project underway and will look to make field changes and modify the permits while the work is proceeding. This project was expected to cost a little less, we have $75,000 budgeted for it. The bids received were as follows: Southeastern Engineering Miguel Lopez Jr. Inc. Williams Paving $84,740.81 $130,257.50 $229,240.00 FUNDING SOURCE: This project will be funded from the Capital Projects Account Number 45-600-5684. A TT ACHMENTS: . Resolution hrtp://sibagenda.sibfl.netlagenda/Preview.aspx?I temID=34 9&MeetingID=0&MeetingDate... 9/28/201 0 City of Sunny Isles Beach 18070 Collins Avenue, 1st Floor Meeting Room Request for Proposals No. 10-08-01 Professional Construction Services for the Central Island Emergency Outfalls Improvements Opening Date and Time: Friday, September 24,2010 at 10:00 a.m. PRESENT: Rick Conner, City Manager Jorge Vera, Assistant City Manager/Services Gio Batista, Public Works Director Jane A. Hines, CMC, City Clerk Mauricio Betancur, Assistant City Clerk Joel Wadsworth, City Consultant, CGA Interested Parties 3 responses to RFP No. 10-08-01 were received: 1. Williams Paving, Co. Alan B. Rodriguez, VP 11300 NW South River Drive Medley, FL 33178 Phone: 305-882-1950 Fax: 305-882-1966 Email: arodriguez@williamspaving.com Bid Amount: $229.240.00 CLoriginal and ~ copies received) 2. Southeastern Engineering Contractors, Inc. Eduardo Dominguez, PE, GC, President 12054 NW 98th Avenue Hialeah Gardens, FL 33018 Phone: 305-557-4226 Fax: 305-557-8568 Email: CLoriginal and ~ copies received) Bid Amount: $84,740.81 3. Miguel Lopez Jr., Inc. Miguel Lopez, President 7711 NW 74th Avenue Medley, FL 33166 Phone: 305-884-0767 Fax: 305-884-0642 Email: miguel@lopezinc.com (.loriginal and ~ copies received) Bid Amount: $130.257.50 Submitted by: ~~-~: Jane A Hines, CMC, City Clerk - . . . '-, Page 1 of 1 PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the CITY OF SUNNY ISLES BEACH is seeking proposals for professional construction services for the Central Island Emergency Outfalls Improvements. Interested firm/individuals ("Proposer (s)") may pick-up a copy of Request for Proposals ("RFP") No. 10-08-01 to be issued on Monday, August 16,2010 at Sunny Isles Beach Government Center, 18070 Collins Avenue, City Clerk's Office, Fourth Floor, Sunny Isles Beach, Florida, 33160. RFP No. 10-08-01 is also available from DemandStar by calling (800) 711-1712 or by accessing their website at www.demandstar.com. The RFP contains detailed and specific information about the scope of services, submission requirements and selection procedures. One (1) original, and four (4) copies of the completed and executed Submissions must be delivered to the following address no later than Wednesday, September 15,2010 at 10:00 a.m.: Sunny Isles Beach Government Center 18070 Collins A venue, City Clerk First Floor Meeting Room Sunny Isles Beach, Florida, 33160 The City reserves the right to accept or not accept late submitted bids in the sole discretion of the City Manager or his designee. The envelope containing the sealed Proposal must be clearly marked as follows: "SEALED PROPOSAL" RFP NO. 10-08-01 FOR PROFESSIONAL CONSTRUCTION SERVICES FOR THE CENTRAL ISLAND EMERGENCY OUTF ALLS IMPROVEMENTS OPENING DATE AND TIME: Wednesday, September 15,2010, at 10:00 a.m. The City of Sunny Isles Beach (the "City") intends to enter into an agreement with the successful Proposer to perform Central Island Emergency Outfalls Improvements in the City of Sunny Isles Beach, Florida. The project is located on North Bay Road between 180th Drive and 183rd Street in the City. The proposed project consists of installing three new 24-inch outfalls and re- establishing an existing 16-inch outfall in connection to the existing stormwater management system and discharging to Dumfoundling Bay. The contract will be awarded by the City to the Proposer whose proposal best serves the interests of, and represents the best value to, the City in accordance with the criteria set forth in Section 62-8 of the City Code. The City reserves the right to reject any or all proposals, with or without cause, to waive technical errors and informalities, and to accept the proposal which best serves the interest of and represents the best value to the City. 3 - Any questions regarding RFP No, 10-08-01 are to be directed in writing to Jorge Vera, Assistant City Manager, at the following address: 18070 Collins Avenue, Sunny Isles Beach, Florida 33160. Alternatively, any questions may be sent via email to:JVera@sibfl.net. Any questions or clarifications concerning the proposal specifications must be received by Jorge Vera, Assistant City Manager, in writing at least seven (7) business days prior to the date of the proposal opening. For further information, please contact Jorge L. Vera, Assistant City Manager, at 305-792-1912. Jane A. Hines, CMC, City Clerk City of Sunny Isles Beach 4