TECHNICAL AND FINANCIAL PROPOSAL
PRESENTED TO THE
CITY OF SUNNY ISLES BEACH
For the
Demolition and Reconstruction
of
the Historic Sunny Isles Beach Newport/
Fishing Pier at Pier Park
./
CITY RFQ No. 10-07-02
Addendum No.1, 2, 3
~~~
Prime Contractor
Tenex Enterprises Inc.
850 SW 14th Court, Pompano Beach, FL 33060
Sub-Contractor
Palm Beach Marine Construction, Inc.
1410 Forsythe Road, West Palm Beach, FL 33405
n
TENEX
ENTERPRISES
y,"-M SEACH MARINE'
D.~~
CONSTRUCTJON,INC
____111ft
August 17, 2010
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
TABLE OF CONTENTS
SECTION 1 - PROJECT OVERVIEW AND ORGANIZATIONAL APPROACH
SECTION 2 - PROJECT SCHEDULE
SECTION 3 - TECHNICAL APPROACH & METHODOLOGY
SECTION 4 - FINANCIAL PROPOSAL
SECTION 5 - EXPERIENCE & REFERENCES
EXHIBIT "A" SWORN STATEMENT TO PUBLIC ENTITY CRIME
EXHIBIT "B" NON-COLLUSIVE AFFIDAVIT
BID BOND (TENEX)! STATEMENT OF BONDABILlTY (PALM BEACH MARINE)
FINANCIAL STATEMENT
LICENSES !INSURANCE ! SUPPLEMENTAL DOCUMENTS
1
6
7
9
10
16
19
21
24
43
SECTION 1 - PROJECT OVERVIEW AND ORGANIZA TIONAL APPROACH
The City of Sunny Isles Beach intends to
demolish and reconstruct the Historic
Sunny Isles Beach/Newport Fishing Pier,
located at 16701 Collins Avenue. It was
originally built in 1936 and designated by
the Miami-Dade County Historic
Preservation Board as historic site in 1982
and then by the City of Sunny Isles Beach
Historic Preservation Board in 2005.
1.1 Project Understanding
The pier sustained major damage during Hurricane Wilma in 2005 and has been closed to the public ever since
due to structural and safety issues. At this time the City intends to demolish the existing pier and restaurant
and replace them with brand new structure. The construction plan and specifications has been prepared by
the consulting firm, Beiswenger, Hoch and Associates, Inc. for the City for the pier reconstruction. A group of
consultants spearheaded by Marlin Engineering, Inc., Beiswenger, Hoch and Associates, Inc. (for
Architecture), Project Caine (for MEP) and Botas Engineering, Inc. (for Structural) prepared the construction
plans and technical specifications for the restaurant. These plans and technical specifications are the basis
for this technical and financial proposal.
Our Team will be responsible for demolition and construction of all the improvements as described in the
scope of work as prepared by a team of Consulting Engineers and Architects identified above and as itemized
in our Schedule of Values. This work will be completed within 11-12 months as outlined in the proposed
schedule provided in Section 2.
Page 2 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
1.1.1 Demolition and Public Information Involvement
Demolition is a critical undertaking in this project. This project is located within a high impact tourist
area and the goal is to minimize the impact and inconvenience to adjoining businesses. In addition
to his function as the Project Manager for this project, Mr. Bill Evans, will function as our public
information officer. He will work closely with the City staff and officials to make sure that residents,
hotel guests and affected business enterprises are at all times informed and are provided with timely
information. Mr. Evan's previous experience as former Public Works Director of this City together
with his ability for effective consensus building techniques with local stakeholders, elected officials
and the press. He will aid and expedite the flow of the project for timely completion.
1.1.2 Permitting and Fees
It is our understanding that the City will acquire all critical permits (i.e. FDEP, Buildiong Permit, etc.)
including costs attendant thereto. The City will waive all fess for City Permits, but not the permit fees.
However, fees such as those for DERM will be secured by the contractor.
The fees for the inspections of the pilings shall be borne by the City as indicated in Addendum No.1
1.1.3 Ground Monitoring
During the demolition and piling activities, significant ground disturbance will be expected. The
Team will employ a third party consulting company to monitor any disturbance due to vibration so
that the Team will be able to move forward with the project with minimal disturbance to residents
including hotel guests and adjoining businesses.
1.1.4 Geotechnical Services
Any additional geotechnical work anticipated on this project will be performed by a third party
consulting firm to be determined and paid for by the City of Sunny Isles Beach.
1.1.5 Utility Coordination
Early coordination with the utilities, stakeholders and accurate information regarding their facilities
will help eliminate conflicts during construction. Our Team's goal will be to work with the City and
facilitate contract plans to be forwarded to all area utilities. Information requested from the utilities
will include: 1) location of their existing/proposed facilities, 2) depth and cover of buried facilities, 3)
whether or not buried facilities are encased, 4) are the utilities located in an easement, and 5)
whether or not the utility will seek to be reimbursed for relocation.
1.2 Staffing Plan
The success of any project lies in the effective implementation of a well devised management plan. The
technical qualifications and experience of the staff assigned to the project must match the requirements of the
project. In assembling the staff, we not only looked at the special technical capabilities of each individual but
also availability to commit to this project.
The staff being proposed to the City will be committed for the duration of the contract. Key staff members
include:
Page 3 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
Project Team Team Member Project Assignment Years of
Experience
Prime Contractor
Tenex Enterprises, Inc. Hamid Fouladi Principal 20
William "Bill" Evans Project Manager 20
Ronnie S. Navarro, PE Engineering Consultant 25
Fred Asbaghi Building Superintendent 25
Sub-Contractors
Palm Beach Marine Javier Quevedo Marine Construction Supervisor 12
Construction, Inc.
Cebrone Atkins Drilling Superintendent 16
Jerguson Electric, Inc. Andrew Jerguson, III Electrical Supervisor 30
1.3 Responsible Office
The responsible office will be Tenex Enterprises, Inc. with office located at 850 SW 14th Court, Pompano
Beach, FL 33060. Accounting, procurement, and administrative support services for this project will be
provided at this location. Technical and engineering support services will also be provided through its in-
house Engineering Consultant.
1.4 Project Administration
The key to the success of this contract hinges on the Project Manager. For this contract, our Team is
committing the services of Mr. Bill Evans - Vice President of Tenex Enterprises, Inc. In his absence, Mr. Hamid
Fouladi will take charge.
Our Project Management Approach is to establish the project requirements; set the basis for controlling
scope, schedule, and budget of the project tasks; and describe the principal responsibilities and authority of
the project participants. We understand the necessity of successfully completing project goals within the
predetermined schedule and work program budget. We will use a "hands-on" Project Management Approach
to effectively complete the contract. Upon receipt of the Notice to Proceed, we will schedule a meeting with
the City's Project Manager to discuss the proposed scope of services and will schedule a field visit to fine
tune the scope of services. The initial field review will include videotaping/pictures of existing conditions to
help to define project issues and deficiencies and provide base line information prior to demolition and
Page 4 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
construction. After the field meeting, we will coordinate with the City's Project Manager to finalize schedules
and construction staging areas, and other administrative and technical matters.
Mr. Evans will be responsible for meeting all scheduling, quality, and budget commitments. He will have full
corporate support, empowering him to commit company resources and to facilitate coordination, direction,
and communication between the Team and the City. As Project Manager, Mr. Evans will:
../ Serve as the single point of contact on all contract issues
../ Ensure that expectations are met and information is being delivered
../ Interact with all stakeholders (City of Sunny Isles Beach, regulatory agencies, etc.)
../ Take a proactive approach in seeking out issues and their early resolution
../ Described below is a set of management activities that we will deploy for this project.
1.4.1 Project Work Plan
At Notice to Proceed (NTP), our Team will prepare a Project Work Plan for distribution among all
Team members. The work plan will be a living document that establishes the project requirements;
sets the basis for controlling scope, schedule, and budget; describes the principal responsibilities
and authority of the project participants; and documents and maintains project decisions and
criteria (e.g. variations/exceptions, geometry input/output, etc.).
1.4.2 Project Kick-Off Meeting
The Project Manager will begin with a kick-off meeting to identify the key project issues, team
participants, discuss project purpose and goals, define team member roles and responsibilities, and
identify expectations. The planning and scheduling of the kick-off meeting will be coordinated
through the City's Project Manager.
1.4.3 Project Reporting
The Project Manager will prepare and distribute comprehensive meeting documents (e.g. Agendas,
Sign-in Sheets, Meeting Minutes, and Telephone Logs) in a timely manner. Agendas will be submitted
for approval to the City's Project Manager one week prior to any meeting. Meeting minutes will be
distributed within three working days of the conclusion of any meeting. Action items will include
identification of the individuals responsible for follow-up along with the date for completion.
Accurate and up-to-date Monthly Progress Reports will be the primary method for communicating the
status of the project on a consistent basis. Progress reports will include an executive summary with
accomplishments for the month, projected activities for the following month and identification of any
issues and suggested resolutions.
1.4.4 Control of Project Schedule
The preparation of a comprehensive Project Schedule along with continuous tracking is one of the
most important and fundamental tools for effective project management. For purposes of scheduling
and budget control, our approach includes developing and implementing a Work Breakdown
Structure (WBS) that identifies tasks based on a logical organization. The WBS will focus on project
milestones and will be the basis for identifying schedule activities and for monitoring cost. Our Team
will work with the City Manager on monthly updates of the project schedule (percent complete, logic
ties, identification of negative float recovery, etc.). Throughout the project, we will continuously
Page 5 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
review and update the schedule as necessary. Flexibility in the schedule has to be maintained
because of the following: inclement weather, tidal and/or wind conditions.
1.5 Organizational Structure
)
Construction Project
Manager
......Tj8~~.Ei~~~rNi~~~:
.
.
I
.
I
.
)
)
'I
I
~
Accounting, :
Procurement, .
......i.f~~~~b~ijj:
Piling and Decking
(Palm Beach Marine)
'-' ......... ........
Building, Site Works,
Deck R<liling
.g~ne~~rit~rP.n~~;)
Site Electrical
(JergusonElectric)
Technical and
Engineering Support
,-,.. .
SECTION 2 - PROJECT SCHEDULE
Our Team has prepared a preliminary schedule based on the following major activities:
Demolition
2 to 3 weeks
Test Piling
2 weeks
Pile Production and Delivery
4 to 6 weeks
Piling and Decking
4 weeks
Landside
4 weeks
Seaside
8 weeks
Restaurant Shell Construction
16 weeks
Railing and Electrical System for the Pier
6 weeks
Parking Area
3 to 4 weeks
Demobilization and Project Close
2 weeks
Activities 2.1 through 2.4 are contingent on weather, tidal and wind conditions.
Under an ideal condition the entire project can be done in 10 months. However, due to unforeseen weather and tidal
conditions we are anticipating a downtime allowance of 2 to 6 weeks depending on when the project will be started.
Page 6 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
Realistically the entire project can be delivered within 11- 12 months, assuming no permitting and/or construction
inspection obstacles are encountered.
As mentioned in Section 1 of this proposal, a detailed Work Breakdown Structure (WBS) Schedule would be provided
during contract negotiation to identify critical path for this project and identify other factors (weather time, inspection
milestones, etc.). The start date (season of the year) of construction is critical since this will dictate whether shorter or
longer weather time will be required.
SECTION 3 - TECHNICAL ApPROACH AND METHODOLOGY
3.1 Innovative Construction Technology
In order to deliver a cost effective construction solution, our Team will implement a unique offshore
construction system. This system will eliminate the conventional boat-based operations in driving large
diameter pipe piles and erecting pile supported structural decks. This technology will reduce downtime due to
erratic and sometimes destructive wave actions and provide a stable platform to stage the work. The
Restaurant Building and the Site Works will follow the conventional approach.
3.2 Project Stake-Out and As-Built Survey
The Team will work with two different surveying companies Sea Diversified, Inc. (seaside construction layout)
and Felippelli Surveying, Inc. (Iandside construction layout). The Team will provide the City final as-built
survey at the end of the project.
3.3 Pre-stressed Concrete Test Pile
A test pile program will be implemented to determine the adequacy of the piles in bearing and lateral loads. All
tests will be coordinated with the Engineer of Record and City representatives. The Team will submit
specifications on the diesel hammer and get approval before pile installation. All piling will be installed per
permitted design and specifications. The Team understands that it could potentially encounter rock and has
taken this into consideration. When rock is encountered, the Team will drill and drive pile tip until elevation is
met per permitted design and specifications.
3.4 Concrete Pilings, Foundation, and Pile Driving
All fixed piers will be supported by concrete pilings, as per plans and specifications. These pilings will be
driven by way of diesel hammer to meet all load bearing requirements provided by the Engineer. Detailed logs
will be kept by the Team and the Engineer. The Team will coordinate with the Engineer on the days pilings will
be installed. The Team will ensure that no damage is done to existing structures. A Vibration Control
Specialist will monitor site during driving of piles, and will be responsible for preconstruction and post-
construction surveys of existing structure. All material and equipment will be submitted for approval to the
Engineer and the City.
3.5 Construction Materials
The Team will follow the plans and specifications for this project as provided by the Engineer. All concrete
shall be provided by local vendor and approved by the Engineer and the City. All tests shall be coordinated
with the Engineer and the City. The Team will confirm that steel cover, reinforcement steel diameter, concrete
thickness, curing, etc. will be recorded as per specifications provided by the Engineer. The Team will
coordinate concrete tests consisting of four (4) test cylinders for any given amount of concrete cast in one (1)
day.
Page 7 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
3.6 Environmental Issues and Concerns
The Team will work with FDEP and the City to create a sound understanding of the permit conditions. Water
control will be monitored on a daily basis and will be recorded. Documentation of manatee sightings will be
recorded on a daily basis during offshore construction. In case of turtle nesting issues, this will discussed
during the negotiation process.
3.7 Inspection Coordination
The Team understands that the City and other regulatory agencies will be conducting periodic or routine visits
throughout the entire duration of this project. The Team will facilitate these visits and ensure that no delays in
productivity take place. The Team will provide a minimum of 48 hours (2 business days) advance notice to the
Engineer and the City during any critical stage of construction.
3.8 Construction Safety and Housekeeping
The Project Manager or his designated Safety Coordinator will conduct weekly safety meetings. These
meetings are recorded and all employees must sign the safety log acknowledging their attendance. A City
representative is welcome to attend these meetings. Construction workers will be required to wear safety
equipment at all times. These include long pants, work boots, hard hat, safety glasses, gloves, life vests, etc.
The Team will keep the site clear of all work debris, trash and waste materials during the construction
process. The Team will coordinate a traffic plan during unloading/loading of supplies and materials.
3.9 Maintenance of Traffic
The Team will maintain a safe roadway and pedestrian path during all phases of construction.
3.10 Staging Area
A well-organized staging area is crucial aspect to the efficiency of this project. The Team will work diligently
with City and other stakeholders to secure the area.
3.11 Construction Wastes
The Team will dispose of waste materials at proper disposal facilities. Upon project completion and
demobilization, the Team will leave the site free and clear of construction debris.
Page 8 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
SECTION 4 - FINANCIAL PROPOSAL
Line Item Cost Breakdown
Pre-Construction Costs (Budgetary)
Permits
Utility Connection Fees
$
$
25,000.00
10,000.00
Construction Costs
General Requirements
Mobilization $ 250,000.00
Security Fencing $ 10,000.00
Maintenance of Traffic $ 25,000.00
Erosion and Sediment Control $ 15,000.00
Coast Guard Coordination $ 5,000.00
Site Preparation
Demolition of Existing Restaurant, Fishing Pier and Disposal Offsite $ 275,000.00
Site Prep for Marine Works $ 70,500.00
Clearing and Rough Grading - Landside $ 20,000.00
Piling and Deck
Pre-cast Concrete Piling $ 624,000.00
Dynamic Load Tests $ 50,000.00
Pre-stressed Concrete Test Piles
Test Piles Pre-stressed Concrete $ 120,384.00
Concrete Substructures/Bents $ 486,000.00
Pre-stressed Beams (Double Tees) $ 563,192.00
Pier Railing $ 243,000.00
Pier Lighting $ 120,000.00
Restaurant Building
Shell Construction with Roof $ 400,000.00
Heating Ventilating Air Conditioning System $ 35,000.00
Plumbing and Sanitary System $ 25,000.00
Electrical System $ 30,000.00
Fire Protection System $ 15,000.00
Stairways $ 25,000.00
Site Works
Driveway Connection $ 15,000.00
Parking and Site work Improvements $ 75,000.00
Demobilization $ 150,000.00
Total Project Cost $ 3,682,076.00**
Exclusions (Budgetary)
As-Built Survey $ 50,000.00
Engineering During Construction $ 50,000.00
Protection of Existing Structures Vibration Monitoring $ 80,000.00
Environmental Protection $ 30,000.00
Turbidity Monitoring $ 25,000.00
Total $ 235,000.00
**The above construction cost estimate is based on the current design, however our Team will be able to quote a lower construction
price (est. $2.8 mil) based on sound value engineering principles and other cost cutting measures that will meet your budget, comply
with all permitting requirements and still satisfy the original intent of the project. Our Team will look forward to discussing this
further with the City.
Page 9 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
SECTION 5 - REFERENCES & EXPERIENCE
5.1 Summary of Personnel Qualification/Experience
William "Bill" Evans
Project Managerl
Public Information Officer
Mr. Evans has over 20 years of project management and public works experience. He is knowledgeable in
implementing business practices to increase work flow and streamline operations. As a former Public Works Director of
City of Sunny Isles beach he directed and oversaw all aspects public works operations. He organized, implemented,
and supervised activities related to city streets, parks, storm water system, buildings and grounds maintenance, fleet
maintenance and hurricane preparedness. He is very familiar with all the aspects of the project from its inception.
Ronnie S. Navarro, PE
Engineering Consultant
Mr. Navarro has over 25 years of diverse professional and international experience in general civil engineering,
infrastructure and transportation planning, highway and urban roadway design, project/construction management,
municipal engineering and land development (sanitary sewer design, water supply and distribution, drainage), seaport
and airport development. He is experienced in all aspects of project design and development including the conduct of
project feasibility studies, build-operate-transfer schemes, master plans, preliminary, conceptual, final design, contract
document preparation and administration.
Javier Quevedo
Marine Construction Supervisor
Mr. Quevedo has over 12 years of experience in the construction and development industry. Verifiable track record for
the successful completion of multi-million dollar projects through coordinating trades, developing partnerships and
building positive rapport with architects, engineers, local officials, vendors and clients while maintaining costs. Versed
in contract negotiations, project estimating, impending design problems, document preparation, building code and
regulations, material purchasing and site management.
Cebrone D. Atkins, Jr.
Drilling Superintendent
Mr. Atkins, has over Sixteen years experience working with the physical forces of the coastal environment with
extensive knowledge of the coastal processes such as waves. tides, currents and the transport of sediment.
Specializing in the construction, maintenance and repair of erosion control projects; such as bulkheads, seawalls,
breakwaters, revetments, groins, jetties, artificial beach nourishment, coastal bluff reshaping, vegetative stabilization
and navigation projects such as docks, cribs, boat ramps and boathouses, marina basins, harbor projects and
dredging. Owning and operating marine equipment, Le. barges, tugs, pumps and cranes in diverse situations.
Confirmable evidence of successful completion of multi-million dollar undertakings in erosion control projects,
navigation projects and harbor projects working with coordinating professionals.
Page 10 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
5.2 References
Tenex Enterprises, Inc.
City of Weston
Contact:
Sabrina Baglieri
Assistant Director
Construction Services
Tel.: 954. 921. 7781
Jeffrey Skidmore
Assistant City Manager I COO
Tel.: 954. 389.4321
PROJECT:
Bonaventure Roundabout
Manatee Isles
Utilities Repair
Tequesta Trace Park Improvements
Weston Library Park
Three Village Road & Country Isles
Public Works Facility Fueling Station
1-75 @Arvida South Bound Off Ramp Imp.
Saddle Club Rd. & South Post Rd. Roundabout
AYSO Facility @ Weston Regional Park
Tequesta Park, Drainage Improvement
City of Sunny Isles Beach
Contact:
Mr. Jorge Vera
Assistant City Manager
Tel.: 305-792-1711
PROJECT:
172nd St Road Improvements
A1A 183RD Median Closure
A1A Collins Ave Streetscape
Golden Shores Entrance Wall
Atlantic Blvd. Parking Lot & Drainage
Improvements
City of Margate
Contact:
Samuel A. May
Interim Public Works Director
AMOUNT:
$ 427,667.40
$ 1,524,050.55
$ 963,050.00
$ 798,878.75
$ 2,074,501.00
$ 2,450,202.50
$ 286,000.00
$ 888,292.00
$ 1,300,000.00
$ 391,340.80
$ 477,180.00
AMOUNT:
$ 1,402,498.27
$ 520,031.75
$ 1,402,498.27
$198,180.00
$ 300,000.00
COMPLETION:
Sept 2010
July 2010
July 2010
April 2009
Oct 2008
Aug 2008
Nov 2006
April 2006
June 2005
June 2005
Feb. 2005
Jan 2010
Sept 2010
Aug 2009
Nov. 2005
Jan. 2005
n
TENEX
ENTERPRISES
COMPLETION:
Page 11 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
Tel.: 954. 972. 8126
PROJECT:
Margate Blvd Streetscape Improvements
East & West Palm Drive
Coral Gate Park
East River Dr. Restoration
AMOUNT:
$ 3,835,237.41
$ 734,018.25
$ 940,174.00
$ 430,000.00
COMPLETION:
Aug. 2008
Aug. 2008
Aug. 2008
Mar. 2005
City of Ft. Lauderdale
Contact:
Mike Fayyaz
Assistant City Engineer
Tel.: 954. 828.6527
PROJECT:
AMOUNT:
COMPLETION:
Lakeridge
Golden Heights
Bermuda Riviera
Sunset Memorial Gardens Fence Wall
Ft Lauderdale Airport Drainage
Victoria Park Neighborhood Improvements
$ 71,820.00
$ 65,964.00
$ 28,632.14
$ 132,965.00
$ 364,753.00
$ 84,420.00
Sept 2010
June 2010
June 2010
July 2009
Nov. 2006
Sep 2006
City of Tamarac
Contact:
Alan Lam,
Project Manager
Tel.: 954.597.3712
PROJECT:
Covered Pedestrian Walk Way
Southgate Boulevard Streetscape, Inc.
NW 70th Ave Traffic Calming Improvements
Westwood Drive Culvert Improvements
AMOUNT:
$ 676,033.50
$ 1,239,469.00
$ 769,113.00
$ 174,580.00
COMPLETION:
Oct 2009
Dec. 2006
Oct. 2006
March 2007
City of Lauderhill
Contact:
Mr. Indar Maharaj
954-730-301 0
PROJECT:
Main Entryways and Signage
NW 39th AVE Roundabout and Speed Humps
NE 31st AVE Roadway Improvements
Walk Park Improvements
Municipal Complex Lift Station #58
AMOUNT:
$ 650,000.00
$ 124,383.90
$ 177,026.60
$ 315,149.80
$ 212,000.00
COMPLETION:
July 2011
Mar 2011
Nov 2009
Dec 2006
May 2010
Page 12 af 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
ytd-M SEACH MARINE'
D.~~
CONSTRUCTION,INC
____111ft
PALM BEACH MARINE CONSTRUCTION
PROJECT EXPERIENCE I REFERENCES
Project
Scope of Work
Owner I Representative
Engineer
Construction
Cost
Start/Complete
Dates
Quail Valley River Club Mechanically dredge 20.000 cy Quail Valley LLC
Vero Beach, FL Demolish existing 40 slip marina 2345 Highway A1A $1,200,000 Jan. 2005 -
Install new 40 slip marina Vero Beach, FL 32963 Aug. 2005
PM - Cebrone Atkins Steve Mulvey
Suot- Wes Gammons 772-492-2030
FPL - Port Everglades Installation of 900 LF sheet Florida Power & Light Cutcher & Assoc.
Ft. Lauderdale, FL pile seawall 8100 Eisenhower Blvd. 725 N. US Hwy One $1,100,000 July 2006 -
Install & replace channel Ft. Lauderdale, FL 33316 Tequesta. FL Oct. 2006
PM - Cebrone Atkins markers 954-527-3507 Robert Cutcher
Suot - Wes Gammons 561-748-6745
Toscana Condomium Mechanically dredge 28,000 cy Toscana Condo Assoc. MCR Prof. Engineering
Marina Install 12 slip marina 3740 S. Ocean Blvd. 321 Northlake Blvd. $925,000 Sept. 2007 -
Highland Beach, FL Lay 2,500 tons of rip rap Highland Beach, FL North Palm Beach, FL Feb. 2008
PM - Javier Quevedo Frank Zamiello, Pres. Mike Baber
Suot - Wes Gammons 401-732-3558 561-863-3396
Jupiter Pointe Marina Mechanically dredge 15,000 cy Main Street Management Bridge Design Assoc.
Tequesta, FL Demolish 30 slip marina 416 Clematis Street 1402 Royal Palm Bch $1,500,000 July 2009
Install 3,000 If steel bulkhead West Palm Beach, FL 33401 Royal Palm Beach, FL
PM - Cebrone Atkins Install 400 If cone. Sheet pile wall Joe Thomas 561-791-1660
Supt - Wes Gammons Lay 970 tons of rip rap 407-473-9980
Barclay Condominiums Installation of 480' steel wall, Barclay Condominium Assoc. Hernacki Engineering
Palm Beach, FL formed and poured concrete cap 3456 S. Ocean Blvd. 2515 Conroy Drive $581,770 Feb. 2009
and mat tie-back system Palm Beach, FL 33480 West Palm Beach, FL
PM - Javier Quevedo Mike Stellino T.R. Hernacki
Supt - Wes Gammons 561-582-2965 561-776-0868
Page 13 of 15
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
Project
Scope of Work
Owner I Representative
Engineer
Construction
Cost
Start/Complete
Dates
The President of Palm Beach Installation of 600 LF wood dock President of Palm Beach Chalaire & Assoc
Palm Beach, FL 33480 Condo Assoc. 600 Sandtree Dr.. #212 $680,000 Mar. 2007 -
2404 S. Ocean Blvd. Palm Bch Grdns, FL Oct. 2007
PM- Palm Beach, FL 33480 561-694-0336
Suot. Wes Gammons Jeremv Holland/561-582-5373
De/ray Harbour Marina Demolition of 45 slip marina Delray Harbour Club Technomarine
Delray Beach, FL Mechanically dredge 12,000 cy Property Owner's Assoc. Engineering Division $263,000 Feb 2008 -
Install new 45 slip floating dock 1035 S. Federal Highway Montreal, Canada Sept. 2008
PM- marina Delray Beach, FL 33486
Suot - Was Gammons Peter Matteodo/561-445-5138
Jupiter Inlet Village Demolition of existing seawall Town of Jupiter Bridge Design Assoc.
Jupiter, FL Installation of new 20 If seawall 210 Military Trail 1402 Royal Palm Bch $290,000 Apr. 2009 -
with upland retaining wall Jupiter, FL 33458 Royal Palm Beach. FL
PM - Cebrone Atkins Tom Lepore 561-791-1660
Sunt - Wes Gammons 561-741-2680
Lake Parle Marina & Demolition of existing damaged Town of Lake Park Cutcher & Assoc.
Breakwater floating dock 105 Lake Shore Drive 725 N. US Hwy One $493,000 Dec. 2008 -
Lake Park, FL Installation of concrete break- Lake Park, FL 33403 Tequesta, FL May 2009
PM - Javier Quevedo water and new 18' concrete Robert Cutcher Robert Cutcher
Suot - Wes Gammons DilinQs and f10atinQ dock 561-748-6745 561-748-6745
FPL - Riviera Beach Florida Power & Light
700 Universe Blvd. $173,000 Sept. 2009
Juno Beach, FL
PM - Cebrone Atkins
Suot - Wes Gammons
Riverwalk Water Taxi Dock Construction of new public access Town of Jupiter Bridge Design Assoc.
Jupiter, FL water taxi dock 210 Military Trail 1402 Royal Palm Bch $74,160 Sept. 2008 -
Jupiter, FL 33458 Royal Palm Beach, FL Jan. 2009
PM - Cebrone Atkins Tom Lepore Sasha 1561-791-1660
Suot - Wes Gammons 561-741-2680
Page 14 of 15
-
TECHNICAL AND FINANCIAL PROPOSAL
Demolition and Reconstruction of the Historic Sunny Isles Beach/New Port Fishing Pier
Pier Park, City of Sunny Isles Beach, FL
Project
Scope of Work
Owner I Representative
Engineer
Construction
Cost
Start/Complete
Dates
John U. Lloyd Beach State Removal of existing docks & Dept. of the Army JPG Structural Group
Park - Boat Ramp Dock restoration of adjacent seawalls Jacksonville District ACOE 1221 W. Tharpe Street $450,000 Sept. 2009 -
Replacement and boat ramps PO Box 4970 Tallahassee, FL 32303 Mar. 2010
Dania Beach, Fl Jacksonville. Fl 32232-0019 850-574-2788
Mitch Fenton 1850-488.5372
Jaycee Park Boardwalk Installation of 140' wooden City of Boynton Beach Miller Legg
City of Boynton Beach boardwalk and kayak/canoe 100 E Boynton Beach Blvd. 2005 Vista Pkwy, #100 $215,600 Aug. 2009-
launch Boynton Beach. Fl 33425 WPB, Fl33411 Nov. 2009
Chris Betancourt
561-689-1138
Day Dockage Installation of floating docks & City of Ft. Lauderdale Sea Diversified Inc.
Fort Lauderdale, Fl concrete landings for public 100 N Andrews Avenue J3 Executive Center $900,000 May-10
dockage Fl. lauderdale, Fl 33301 1200 NW 17th Ave.. #3
Delray Beach. Fl 33445
954-828-6891 561-243-4920
Seawall Replacement Installation of 211 If concrete City of Pompano Beach Sea Diversified Inc.
scon Winters Park & sheet pile seawall 1201 NE 5th Avenue J3 Executive Center $368.000 Mar-10
N. Riverside DriVe. Pompano Beach. FL 33060 1200 NW 17th Ave., #3
Pompano Beach, FL Clayton Young Delray Beach, FL 33445
954-786-4506 561-243-4920
Ocean Front Park Remove existing board and install City of Boynton Beach Milier legg
City of Boynton Beach new boardwalk with associated 100 E Boynton Beach Blvd. 2005 Vista Pkwy, #100 $1.280,000 Feb-10
upland construction Boynton Beach, FL 33425 WPB, FL 33411
Chris Betancourt
561-689-1138
Riverside Filter Marsh Install levee system for storm City of Naples Mactec Eng'g & Cons.
City of Naples water run off 270 Riverside Cirde 404 SW 140th Terrace $405,000 Apr-10
Naples, FL 34102 Newberry, FL 32669
fax: 239-213-7105 352-332-3318
Page 15 of 15
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted
~ The City of Sunny Isles Beach
by Tenex Enterprises, Inc.
for Professional Construction Services to Demolish and Reconstruct
the Historic Bunny Isles Beach/Newport Fishing pier at Pier Park
wliose busmess address IS
850 SW 14th Court, Pompano Beach, FL 33060
and (if applicable) its Federal Employer Identification Number (FEIN)
52-2069619
(If the entity had no FEIN, include the Social Security Number of the individual signing this
sworn statement:
2. I understand that a "public entity crime" as defined in Paragraph 287.133(l)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(l)(b), Florida
Statutes means a fmding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or
entry of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287.133(l)(a), Florida Statutes. means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
EXHIBIT" A"
14
5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States with
the legal power to enter into a binding contract and which bids or applies to bid on contracts
for the provision of goods or services let by a public entity, or which otherwise transacts or
applies to transact business with a public entity. The term "person" includes those officers,
directors, executives, partners, shareholders, employees, members, and agents who are active
in management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (1) of the
following three (3) statements is applicable.)
-K- (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the
State of Florida, Division of Administrative Hearings and the Final Order by the Hearing
Officer determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WmCH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD
AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE
CORY TW:JO-Y CHANGE IN THE INFORMATION CONTAINED IN THIS
ORM.
~
Hamid Fouladi
SIGNATURE OF AFFIANT (printed or Typed Legal Name of Mfiant)
15
State of Florida of County of Miami-Dade )
Sworn to and subscribed before me this 16th day of August
Hamid Fouladi as President of Tenex Enterprises, Inc.
-\i.a 'f~i
Notary Seal:
Notary's Name Printed, Stamped or Typed
li:.::;r,rr~< RYANSPRADUN
~*i 1.r1i.'~ :*; MY COMMISSION # DO 920502
~'~J.:":.! EXPIRES: August 27,2013
"~i1r..i\i.'" Bonded Thru Notary Public Underwriters
Personally Known:
x
or Produced Identification
Identification Produced
,2010 by
16
NON-COLLUSIVE AFFIDA VlT
State of Florida )
)ss
County of Miami-Dade )
Hamid Fouladi
says that:
being first duly sworn, deposes and
(1) He/she is the (Owner, Partner, Officer, Representative, or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded,
conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or
person to submit a collusive or sham Bid in connection with the Work for which the
attached Bid has been submitted; or to refrain from bidding in connection with such
Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or
communication, or conference with any Bidder, firm, or person to fix the price or prices
in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements
of the Bid price or the Bid price of any other Bidder, or to secure through any collusion,
conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny
Isles Beach, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder
or any other of its agents, representatives, owners, employees or parties in interest,
including this affiant.
EXHmIT "B"
17
FURTHER, AFFIANT SAYETH NAUGHT.
By: 1--( A-tt..b 0 l;,v t.- t\D:1
President/Owner
Sworn to and subscribed before me this 16thday of Auqust
, 2010,
by
Hamid Fouladi
(President/Owner)
of
Tenex Enterprises. Inc.
who is personally known to me or has produced a
as identification.
~ 'r -dL "C>L
-'
Notary Public
My Commission/Expires:
,,'~rtA'-' RYAN SPRADLIN
~~~;AJ'..j, .j;>'.
N :.~ MY COMMISSION # DD 920502
~" .......f EXPIRES: August 27,2013
"'~ift.,\\I'" Bonded Thru Notary Public Underwriters
My Commission No.:
J .
THE AMERICAN INSTITUTE OF ARCHITECTS
I
A/A Document A310
Bid Bond
KNOW ALL MEN BY THESE PRESENTS,
Tenex Enterprises, Inc.
850 SW 14th Court, Pompano Beach, FL 33060
as Principal, hereinafter called the Principal, and
that we
(Here insert full name and address or legal title of Contractor)
(Here insert full name and address or legal title of Surety)
Western Surety Company
P.O. Box 5077, Sioux Falls, SD 57117-5077
a corporation duly organized under the laws of the State of South Dakota
as Surety, hereinafter called the Surety, are held and firmly bound unto
C't f S I I B h (Here insert full name and address or legal title of Owner)
I y 0 unny s es eac
18070 Collins Avenue, Sunny Isles Beach, FL 33160
as Obligee, hereinafter called the Obligee, in the sum of ---- Five Percent of the Amount Bid --------------
--------------------------------------------------------------- Dollars ($ 50/0 )
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind
ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, The Principal has submitted a bid for
(Here insert full name, address and description of project)
Bid No. 10-07-02; Demolition and Construction ofthe Historic Sunny Isles Beach/Newport
Fishing Pier at Pier Park
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding
or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt
payment of labor and material furnished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise
to remain in full force and effect.
Signed and sealed this
17th
day of August
2010
~-+-~~-
-
(Seal)
~~J--
(Waness)
Inquiries: (407) 834-0022
AlA DOCUMENT A310. BID BOND. AlA Q . FEBRUARY 1970 ED. THE AMERICAN
I~STITUTE OF ARCHITECTS, 1735 N.Y. AVE., N.W.. WASHINGTON, D.C. 20006
..
Western Surety Company
POWER OF ATTORNEY APPOINTING INDIVIDUAL A TTORNEY -IN-FACT
Know All Men By These Presents, That WESTERN SURETY COMPANY, a South Dakota corporation, is a duly organized and existing corporation
having its principal office in the City of Sioux Falls, and State of South Dakota, and that it does by virtue of the signature and seal herein affixed hereby
make, constitute and appoint
J W Guignard, Bryce R Guignard, M Gary Francis, April L Lively, Paul J Ciambriello,
Jennifer L McCarta, Margie L Morris, Peggy Snow, Individually
of Longwood, FL, its true and lawful Attorney(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on its behalf
bonds, undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind it thereby as fully and to the same extent as if such instruments were signed by a duly authorized officer of the corporation and all the acts of said
Attorney, pursuant to the authority hereby given, are hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By-Law printed on the reverse hereof, duly adopted, as indicated, by
the shareholders of the corporation.
In Witness Whereof, WESTERN SURETY COMPANY has caused these presents to be signed by its Senior Vice President and its corporate seal to
be hereto affixed on this 27th day of October, 2009.
~,,,~~~E"T~I,I.
$"~o/-'-'-"'C'O''''
!~! o..90""I;'~'f,\
~::\(,j (l"j:j
\'\j-..,s ~ Po ":/ if..!
"...~i';:rD~;lO"~"
""'''"I''~
WESTERN SURETY COMPANY
~~";OCV;"P~;d'",
State of South Dakota
County of Minnehaha
} ss
On this 27th day of October, 2009, before me personally came Paul T. Bruflat, to me known, who, being by me duly sworn, did depose and say: that
he resides in the City of Sioux Falls, State of South Dakota; that he is the Senior Vice President of WESTERN SURETY COMPANY described in and
which executed the above instrument; that he knows the seal of said corporation; that the seal affixed to the said instrument is such corporate seal; that it was
so affixed pursuant to authority given by the Board of Directors of said corporation and that he signed his name thereto pursuant to like authority, and
acknowledges same to be the act and deed of said corporation.
November 30, 2012
+~~~~~~~~~~~~~~~~~~~~~~~~+
$ D. KRELL $
r r
$~NOTARY PUBLIC~$
r SOUTH DAKcrrA r
r r
+~~~~~~~~~~~~~~~~~~~~~~~+
~
~P"bl;'
My commission expires
CERTIFICATE
I, L. Nelson, Assistant Secretary of WESTERN SURETY COMPANY do hereby certifY that the Power of Attorney hereinabove set forth is still in
force, and further certifY that the By-Law of the corporation printed on the reverse hereof is still in force. In testimony whereof I have hereunto subscribed
my name and affixed the seal of the said corporation this 17th day of August 2010
~~",~;I[j."Y",,1.
~~,,)...-..........C'o\.
!~'} o..90""I~\~\
~={(,j ~l:i
s\\~~A".Iif!
.....1',,> <"....
"..-u/:".-..;i.O....
'I",,,..u~,~~~"""-
WESTERN SURETY COMPANY
q. ~ ~'~s"~mry
Fonn F4280-09-06
Authorizing By-Law
ADOPTED BY THE SHAREHOLDERS OF WESTERN SURETY COMPANY
This Power of Attorney is made and executed pursuant to and by authority of the following By-Law duly adopted by the shareholders
of the Company.
Section 7. All bonds, policies, undertakings, Powers of Attorney, or other obligations of the corporation shall be executed in the
corporate name of the Company by the President, Secretary, and Assistant Secretary, Treasurer, or any Vice President, or by such other
officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer
may appoint Attorneys in Fact or agents who shall have authority to issue bonds, policies, or undertakings in the name of the Company.
The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the
corporation. The signature of any such officer and the corporate seal may be printed by facsimile.
-
NIEL,sON. ROSENHAUS & ASSOCIATES
~JAugust16,2010
~4
IIi Hamid Fouladl
()
/.: Tenex Enterprises
III
:~ 850 SW 14th Ct.
II
~\ Pompano Beach, FL 33060
r(
"'
~.~
.(
~; RE:
~(
"
Palm Beach Marine Construction. Inc.
Statement of Bondabillty
v)
/
l)
1 Dear Mr. Fouladi:
()
(()
,
'.
::! This is to advise you that our office provides Bid, Performance, and Payment Bonds for Palm Beach
;,~ MarIne Construction, Inc.
d
~
~ Based upon normal and standard underwriting criteria at the time of the request, we should be in a
:\~ position to provide a Performance and Payment Bonds for the above captioned account. We obviously
>
() reserve the right to review final contractual documents, bond forms and obtain satisfactory evidence of
(J
<'l funding prior to final commitment to Issue bonds, and we cannot assume Ilabllity to any third party,
(} including yourselves, if we do not execute said bonds.
'I,
I
III
." Palm Beach Marine Construction, Inc. is an excellent contractor and we hold them In highest regard. We
L'!
feel extremely confident In our contractor and encourage you to offer them an opportunity to execute
~:~ any upcoming projects.
II'
1ft
;;j This letter Is not an assumption of lIablllty, nor is it a bid or performance and payment bond. It is issued
.'- only as a bonding reference requested by our respected client
,:.1
/
",? Sincerely,
o
."i~
.).
.
U Bre t Rosenhaus,
"'i FL Resident Agent
, .
n.~
.(
-..f
4';1
4000 Soutn S7tn Avenue
Suite 201
lake Worth. FL 33463
P: 561.432.5550
F: 561.432 5442
\:t"'l\'!,ni~I;-;()()h'(}1 Ii h COf,)
Stuart M. Rotman, C.P.A., P.A.
8551 West Sunrise Boulevard, Suite 100A
Plantation, FL 33322
Phone:
Fax:
(954) 475-8020
(954) 475-8099
rotmancpa@aol.com
To the Board of Directors
Tenex Enterprises, Inc.
850 SW 14th Comt
Pompano Beach, Florida 33060
I have compiled the accompanying balance sheet of Tenex Enterprises, Inc. as of May 31, 2010,
and the related statement of operations for the Five Months Then Ended in accordance with
statements on Standards for Accounting and Review Services issued by the American Institute of
Certified Public Accountants.
A compilation is limited to presenting in the form of fmancial statements infonnation that is the
representation of management. I have not audited or reviewed the accompanying financial
statements, accordingly, do not express an opinion or any other form of assurance on them.
Management has elected to omit substantially all of the disclosures required by generally
accepted accounting principles. If the omitted disclosures were included in the [mancial
statements, they might influence the user's conclusions about the Company's financial position,
results of operations, and cash flows. Accordingly, these [manciai statements are not designed
for those who are not infonned about such matters.
~
Stuart M. Rotman
Certified Public Accountant
July 8, 2010
Tenex Enterprises, Inc.
Balance Sheet
As of May 31,2010
ASSETS
Current Assets:
Cash 315,480
Contract receivables 3,223,664
Costs and estimated earnings In excess of billings on
Uncompletes contracts 194,900
Prepaid expenses 198,967
Total Current Assets
Property and Equipment:
Furniture, fixtures, and equipment
Accumulated depreciation
Other Assets:
Note receivable-officer
Total Assets
1,274,527
(628,548)
3,933,011
645,979
207,741
4,786,731
LIABILITIES AND STOCKHOLDERS EQUITY
Current Liabilites:
Credit line
Current portion of long- term debt
Accounts payable & accrued expenses
Deferred income taxes
Income tax payable
Billings in excess of costs and estimated earnings
on uncompleted contracts
Total Current Liabilities
Long-term Debt, Net of Current Portion:
Stockholders Equity:
Common stock-$1.00 par value,
500 shares authorized, issued and outstanding
RetaIned Earnings
Total Stockholders Equity
Total Liabilities and Stockholders Equity
430,239
74,126
2,148,774
521,976
4,752
1,596,914
See accountants compilation report
o
3,179,867
9,450
500
1,597,414
4,786,731
Tenex Enterprises, Inc.
Statement of Operations
For the Five Months ended May 31, 2010
Contract Revenues Earned
4,636,184
Cost of Revenues Earned
Materials 3,213,091
Subcontractors 0
Labor service 611,507
Equipment rental 174,105
Depreciation 35,000
Vehicle expenses 54,166
Bond expense 85,716
Fuel 74,976
Cost of Revenues Earned 4,248,561
Gross Profit 387,623
General & Administrative Expenses
Salary-Officer 31,500
Insurance 91.782
Office expense 25,380
Office payroll 59,500
Payroll taxes 52,617
Professional fees 23,556
Rent 36,878
Taxes & licenses 845
Telephone 11,582
Utilities 16,792
350,432
Income From Operations 37,191
Other Income (Expense)
Interest Income 1,237
Interest expense (3,417)
(2,180)
Income Before Taxes 35,011
Income Taxes
Current 5,200
Deferred 0
Net Income 29,811
See accountants compilation report
Tenex Enterprises, Inc.
Statement of Retained Earnings
For the Five Months ended May 31,2010
Beginning Retained Earnings as of
December 31, 2009
Net Income (loss)
Ending Retained Earnings as of
May 31,2010
See accountants compilation report
1,567,103
29,811
1,596,914
--------
--------
Tenex Enterprises, Inc.
Statement of Cash Flows
For the Five Months ended May 31,2010
Cash Flows From Operating Activities
Net Income
Adjustments to reconcile net income
to net cash provided by operating activities:
Depreciation
(Increase) decrease in:
Contract receivables
Costs and estimated earnings in excess of
billings on uncompleted contracts
Prepaid expenses
Increase (decrease) in:
Accounts payable & accrued expenses
Income tax payable
Deferred income tax payable
Billings in excess of costs and estimated earnings
on uncompleted contracts
Net Cash Used for Operating Activities
Cash Flows From Investing Activities
Purchases of property and equipment
Loans to shareholder
Credit line
Installment loan payments
Net (decrease) in Cash
Cash-December 31.2009
Cash
at May 31,2010
See accountants compilation report
29,811
35,000
(840,397)
7,835
(107,181)
485,175
o
5,200
o
(384,557)
(100,700)
o
430,239
(37,774)
291,765
(92,792)
408,272
315,480
TENEX ENTERPRISES, INC.
FINANCIAL STATEMENTS
FOR THE YEAR ENDED
DECElVIBER 31, 2009
Stuart M. Rotman. C.P.A.. P.A.
8551 W. Sunrise Boulevard, Suite 100A
Plantation, Florida 33322
Phone: (954) 475-8020
Fax: (954) 475-8099
To the Board of Directors
Tenex Enterprises, Inc.
850 SW 14lh Court
Pompano Beach, Florida 33060
I have audited the accompanying balance sheet of Tenex Enterprises, Inc. as of December 31,
2009 and the related statements of income, retained earnings, and cash flows for the year then
ended. These financial statements are the representation of the management of Tenex
Enterprises, Inc. My responsibility is to express an opinion on these financial statements based
on my audit.
I conducted my audit in accordance with auditing standards generally accepted in the United
States of America. Those standards require that I plan and perform the audit to obtain reasonable
assurance about whether the financial statements are free of material misstatement. An audit
includes examining, on a test basis, evidence supporting the amounts and disclosures in the
financial statements. An audit also includes assessing the accounting principles used and
significant estimates made by management, as well as evaluating the overall financial statements
presentation. I believe that my audit provides a reasonable basis for my opinion.
In my opinion, the financial statements referred to above present fairly, in all material respects,
the financial position of Ten ex Enterprises, Inc. as of December 31,2009, and the results of its
operations and its cash flows for the year then ended in conformity with generally accepted
accounting principles.
My audit was made for the purpose offorming an opinion on the basic financial statements taken
as a whole. The Schedules of Contracts in Progress and Completed Contracts are presented for
purposes of additional analysis and are not a required part ofthe basic financial statements. Such
information has been subjected to the auditing procedures applied in the audit of the basic
financial statements and, in my opinion, is fairly stated in all material respects in relation to the
basic financial statements taken as a whole.
~~
Stuart M. Rotman
Certified Public Accountant
April 16,2010
TENEX ENTERPRISES, INC.
BALANCE SHEET
AS OF DECEMBER 31, 2009
Current Assets:
Cash
Contract receivables
Prepaid expenses
Costs and estimated earnings in excess of billings 011
Uncompleted contracts
Total Current Assets
Property and Equipment:
Furniture, fixtures, and equipment
Accumulated depreciation
Other Assets:
Note receivable-officer
Total Current Assets
ASSETS
$ 408,272
2,383,267
91,786
202,735
$ 3,086,060
1,173,827
(593,548)
580,279
207,741
$
3,874,080
LIABILITIES AND STOCKHOLDERS EQUITY
Current Liabilites:
Credit line payable
Current portion of long- term debt
Accounts payable & accrued expenses
Income tax payable
Deferred income taxes
Billings in excess of costs and estimated earnings
on uncompleted contracts
Total Current Liabilities
Long term Liabilities
Long-term Debt, net of cun'ent portion:
Deferred income taxes
Total Long term Liabilities
Stockholders Equity:
Common stock-$I.OO par value,
500 shares authorized, issued and outstanding
Retained Earnings
Total Stockholders Equity
Total Liabilities and Stockholders Equity
0
$ 86,999
1,663,599
4,752
406,856
0
$ 2,162,206
34,351
109,920
144,271
500
1,567,103
1,567,603
$ 3,874,080
See accompanying notes to financial statements
TENEX ENTERPRISES, INC.
STATEMENT OF OPERATIONS
FOR THE YEAR ENDED DECEMBER 31, 2009
Contract Revenues earned: $ 10,295,429
Cost of Revenues earned:
Materials 4,106,229
Subcontractors 3,150,335
Labor service 1,387,715
Equipment rental 298,520
Depreciation 101,446
Vehicle expenses 76,420
Bond expense 173,953
Fuel 142,084
Cost of Revenues earned 9,436,702
Gross Profit 858,727
General & Administrative expenses:
Salary-Officer 70,618
Insurance 205,377
Office expense 41,685
Office Payroll 142,812
Payroll taxes 17,102
Professional fees 55,216
Rent 79,965
Taxes & licenses 19,734
Telephone 20,452
Utilities 24,096
Total General and Administrative Expenses $ 677,057
Income from Operations $ 181,670
Other Income (Expense):
Bad debt expense (83,922)
Interest income 9,333
Interest expense (14,608)
Total Other Income (Expense) (89,197)
Income Before Income Taxes 92,473
Income taxes
Current 5,592
Deferred 20,300
25,892
Net Income $ 66,581
See accompanying notes to [mancial statements
TENEX ENTERPRISES, INC.
STATEMENT OF RETAINED EARNINGS
FOR THE YEAR ENDED DECEMBER 31,2009
Beginning Retained Earnings as of
December 31, 2008
$ 1,500,522
66,581
Net income
Ending Retained Earnings as of
December 31, 2009
$ 1,567,103
See accompanying notes to financial statements
TENEX ENTERPRISES, INC.
STATEMENT OF CASH FLOWS
FOR THE YEAR ENDED DECEMBER 31, 2009
Cash Flows from Operating Activities:
Net income
Adjustments to reconcile net income
to net cash provided by operating activities:
Depreciation
(Increase) decrease in:
Contract receivables
Costs and estimated earnings in excess of
billings on uncompleted contracts
Prepaid expenses
$ 66,581
101,446
(208,131)
456,253
(68,425)
Increase (decrease) in:
Accounts payable & accrued expenses
Income tax payable
Deferred income tax payable
Billings in excess of costs and estimated earnings
on uncompleted contracts
51,944
21,106
11,865
o
Net Cash Provided By Operating Activities
432,639
Cash Flows from Investing Activities:
Purchases of property and equipment
Credit line
Installment loan payments
(56,726)
(250,000)
(93,060)
(399,786)
Net increase In Cash
32,853
Cash-December 31, 2008
375,419
Cash at December 31,2009
$
408,272
See accompanying notes to financial statements
TENEX ENTERPRISES, INe.
NOTES TO FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31,2009
NOTE A - SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Business Activity
The Company perfonns construction and repairs of major roads, airport runways and aprons,
parking lots, sidewalks, curb and gutters, and storm drainage facilities including any excavating,
clearing, grading and concrete work necessary and incidental thereto.
Management uses estimates and assumptions in preparing these financial statements in
accordance with generally accepted accounting principles. Those estimates and assumptions
affect the reported amounts of assets and liabilities, the disclosure of contingent assets and
liabilities, and the reported revenues and expenses. Actual results could vary from the estimates
that were used.
Revenue and Cost Recognition
The Company recognizes revenues from fixed-price and modified fixed-price construction
contracts on the percentage-of-completion method, measured by the percentage of cost incurred
to date to estimated total cost for each contract. That method is used because management
considers total cost to be the best available measure of progress on the contracts. Because of
inherent uncertainties in estimating costs, it is at least reasonably possible that the estimates used
will change within the near tenn.
Contract costs include all direct material and labor costs and those indirect costs related to
contract performance, such as indirect labor, supplies, tools, repairs, and depreciation. Selling,
general, and administrative costs are charged to expense as incurred. Provisions for estimated
losses on uncompleted contracts are made in the period in which such losses are determined.
Changes in job performance, job conditions, and estimated profitability may result in revisions
to costs and income, which are recognized in the period in which the revisions are determined.
The asset, "Costs and estimated earnings in excess of billings on uncompleted contracts,"
represents revenues recognized in excess of amounts billed. The liability, "Billings in excess of
costs and estimated earnings on uncompleted contracts," represents billings in excess ofrevenues
recognized.
TENEX ENTERPRISES, INC.
NOTES TO FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31, 2009
NOTE A - SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES (continued)
Depreciation
Depreciation is provided principally on the straight-line method over the estimated useful lives
of the assets, which are generally from five to seven years.
Income taxes
Income taxes are provided for the tax effects of transactions reported in the fmancial statements
and consist oftaxes currently due plus deferred taxes related primarily to the difference between
the bases of long-term contracts for financial reporting and income tax reporting. The deferred
taxes represent the future tax return consequences of those differences, which will either be
taxable or deductible when the assets and liabilities are recovered or settled. For tax purposes,
the Company uses the cash method of recognizing revenues on long-term contracts. The bases
oflong-term contracts for financial reporting, exceed the tax bases. The excess will be taxable
when the contracts receipts are collected and costs are disbursed.
NOTE B - CONTRACT RECEIVABLES
Contract receivables consist of:
Billed
Completed contracts
Contracts in progress
Retainage
Other short term jobs
$ 410,221
1,159,647
554,640
258.759
$ 2.383.267
TEN EX ENTERPRISES, INC.
NOTES TO FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31,2009
NOTE C - COSTS AND ESTIMATED EARNINGS ON UNCOMPLETED
CONTRACTS
Costs incurred on uncompleted contracts
Estimated earnings
$ 5,186,673
585.363
5,772,036
5.569.301
$ 202.735
Billings to date
Included in the accompanying balance sheet under the following captions:
Costs and estimated earnings in excess of billings
on uncompleted contracts $ 202,735
Billings in excess of costs and estimated earnings
on uncompleted contracts
o
$ 202.735
The Company does not bill in advance of worked performed.
NOTE D - NOTE RECEIVABLE-OFFICER
The note receivable to the company's sole shareholder is non interest bearing with no
repayment date.
NOTE E - CREDIT LINE PAYABLE
The Company maintains a line of credit up to $250,000 to Regions Bank due on June 1, 2011
at a commercial base rate plus 1 cUlTently 4.25%. It is secured by the Company's assets and
the personal guarantee of the Company's sole shareholder. As of December 31, 2009 the
balance ofthe credit line advanced totaled $0.00.
The Company also maintains a line of credit up to $300,000 to Bank of America due on
August 1, 2009 at a cOlmnercial base rate plus 1 currently 4.25%. It is secured by the
Company's assets. As of December 31,2009 the balance of the credit line advanced totaled
$0.00.
TENEX ENTERPRISES, INC.
NOTES TO FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31,2009
NOTE F - LONG TERM DEBT
Long Term Debt Consists of the following:
Note payable to Chase Auto Finance in monthly installments
of$482.08 including interest of7.35% through February 2011.
Note payable to Wells Fargo in monthly installments of$I,144.81
including interest of 9.46% though September 2010
Note payable to CNH Capital in monthly installments of $820.75
including interest at 7% through August 2013
I
I
I
I
I
I
i I
i I
I
I
i
I
i
I
I
I
I
i
i
I
I
I
I
I
I
I
I
Note payable to CNH Capital in monthly installments of$3,178.01
including interest at 2.9% through January 2011
Note payable to Diversified Financial in monthly installments of
$2,351.03 including interest at 3.49% through March 2011
Less Current Portion
The loans are secured by vehicles and equipment.
Maturities oflong term debt are as follows:
Period Ending
December 31
Amount
2010
2011
2012
2013
$ 86,999
19,630
9,107
5.614
$ 121.350
.'
$
6,287
8,859
31,134
40,624
34.446
121,350
86.999
$
34.351
TENEX ENTERPRISES, INC.
NOTES TO FINANCIAL STATEMENTS
FOR THE YEAR ENDED DECEMBER 31,2009
NOTE G - RELATED PARTY TRANSACTIONS
The Company rents its warehouse/office space from a building that is wholly owned by the
sole shareholder of the Company. Rent totaling $43,771 was paid during 2009.
NOTE H- STATEMENT OF CASH FLOW SUPPLEMENTAL DISCLOSURES
Interest paid
$ 14,608
NOTE I - CONTINGENT LIABILITIES
The Company is a guarantor on equipment financing owned by a subcontractor. The loan has
a current balance of approximately $24,000.
Ol
Ol
w
0:
Cl
o
0:
0.
?;
.Ol
Ur-
ZU
;;fa'!
Wr-o>
OlZO
-00
g: 0 N..
o:u.~
wO'"
~~ffi
W::>lIl
XO::i
www
zJ:U
wUW
r-OlO
!z~
w-'
Uo.
0::::;
~8
~~~ ~~
~~~o~~
::l[ju~>=o:
iii~i5 13U'i
~IilOlOl Ol
<l:,",Cl13 Cl
Ol<~UU.Z
r-01z~[j03
~t; z CD
uw -
0>
o
o
N
Olr-
UlU::
lElE
Cla.
'"
0:
w
1Il
::i
w
U
w
o
c
w
c
Z
w
~
>
w
J:
r-
0:
o
u.
~~
o-Z
",w
o(ij
Uo:
Ul
we
:>w
zz
wo::
GiLS
0::
Oow
~....~
~!i;a.
i=O::;
",uO
w U
'"
Cl w
~g~
iii
g
N
"'!::
"'u.
00
0:0::
Cla.
~
'"
0:
w
1Il
::i
w
U
w
c
o
r-
Z
o
>=
a.
w
U
?;
::i
o
0:
u.
u.'"
O~
r-z
",w
oGi
Uo::
'"
we
::>w
ZZ
~~
0:
e
w",!::
~(/)lL
::;lEO
~c>g:
w
r-
~
r-
Z
o
u
-'
~
o
....
e
i~
i=U
'"
w
r-
Ur-
~a
0::;
u<l:
r-
u
w
i3
0::
a.
~
'"
..
en
o 0 000
'"
~
C;;
en
en
en
en
""
N
'"
a;
N
o
'"
N
'"
Ul
'"
N
~
~
r-:
'"
en
N
....
;;;
.;
'"
'"
~
N
Ul
.....
N
'"
'"
'"
.;
;;
ri
'"
'"
N
N
'"
'"
o
o
o
~
en
N
Ul
'"
"!.
.....
~
ri
0.
~
5
5
..
~
~
Q
'"
o
ex:
<II
~
!!l
CJ
~
S
I-
'"
....
0>
....
oj
0>
'"
.....
"!.
N
0>
'"
'"
.;
'"
o
'"
o
.;
'"
'"
en
:;
ci
en
'"
Ul
'"
.....
N
~
oi
'"
'"
en
'"
'"
.;
Ul
o
'"
o
.;
'"
Ul
0>
:;
ci
en
Ul
~
.;
Ul
'"
o
'"
.;
'"
'"
Ul
'"
...
ri
en
Ul
z
o
>=
'"
'"
is
:a
Q
o
~
....
<II
Q
10
UJ
z
~
2i
z
:s
~
....
'"
"!
;0
0>
C;;
oi
'"
en
'"
o
~
Ul
o
'"
oi
'"
q
;:::
'"
r-:
o
"!.
'"
en
"!.
Ul
...
N
'"
'"
'"
.;
Ul
0>
'"
o
~
'"
o
'"
oi
'"
q
...
.....
'"
r-:
o
"!.
~
'"
~
o
~
.,;
'"
~
~
.....
oi
.....
....
:2
o
~
<II
..J
W
:J
...
UJ
<II
0:
z
:J
<II
....
~
oj
'"
~
M
.;
'"
en
N
Ul
~
'"
.....
'"
.;
.....
.....
.....
g
.;
'"
'"
'"
o
'"
.;
'"
'"
'"
0>
'"
.;
...
'"
en
N
Ul
~
'"
.....
M
.;
.....
.....
.....
o
0>
.;
'"
'"
'"
'"
'"
ri
0>
'"
'"
"'.
o
'"
~
;;;
o
.;
&t
<II
~
!!l
w
i
:i
z
g
<II
W
3:
~
~
ui
'"
o
;0
"!.
~
o
'"
.;
~
N
'"
Ul
ci
~
~
o
,.:
N
N
'"
Ul
g
N
'"
N
.;
'"
o
M
.,;
:'2
1;j
'"
ci
~
o
'"
'"
oi
N
o
Pi
N
~
o
o
o
~
N
z
o
>=
;::
<II
Ii:
::l
:l
r
a:
UJ
o
::>
:s
....
N
,...:
~
;!
<'i
....
....
~
<'i
~
'"
N
'"
o
o
'"
o
"!.
'"
'"
.....
0>
N
.....
~
o
:;
;i
'"
'"
en.
;0
'"
'"
'"
en
.;
'"
;0
N
'"
'"
a;
~
'"
o
o
'"
.;
~
'"
oi
0>
'"
'"
.....
0>
oj
o
'"
'"
~
~
o
'"
a;
~
o
o
'"
.;
'"
o
"!.
'"
'"
.....
0>
N
.....
'"
;0
o
:;
.;
Ul
'"
...
0\
;0
...
:g
0>
.;
~
'"
N
'"
~
0>
~
Ul
o
o
'"
.;
o
'"
.....
:'i
'"
'"
......
Ul
'"
:6
oi
~
~
;h
.....
o
'"
0>
ci
.....
q
'"
~
.;
~
o
o
o
g
'"
o
o
ci
'"
"!.
<>
~
~
<II
:::;
o
o
ex:
I-
<II
W
ex:
~
z
::>
o
u
o
a:
'"
~
o
ex:
lD
'"
z
!2
ex:
'"
0.
~
~
o
()
CJ
~
~
'"
UJ
<II
0:
z
::>
<II
<II
Z
o
F
'"
Q
...
;::
::>
<Ii
lD
0.
~
<II
I;;
<II
Z
::>
<II
"'
'"
.....
N
o
N
'"
'"
'"
.,;
'"
'"
'"
.....
'"
.;
~
.;
'"
'"
o
N
i:::
.,;
'"
o
"!.
:1;
...
N
....
'"
.,;
'"
N
.;
OJ
'"
.....
ei
'"
'"
.l'l
c:
Q)
E
Q)
113
1il
0;
.u
c:
<1l
c:
<<=
.9
'"
Q)
a
c:
'"
c:
.>.
c:
<1l
0.
E
Q
()
CJ
<1l
lD
lD
CIl
~
'"
,.:
N
'"
.;
'"
.....
......
.....
'"
....
'"
N
o
~
r
'"
.",
"!.
..
:;!
'"
....
N
.;
0>
"!.
OJ
,.. m-
e a <Xl Ul ~ <Xl '" 0> ('") co ~ <Xl 0> Ul 0 V
e
N .... co Ul <Xl .... ('") ('") v <Xl '" .... 0> 0> co
ml- ..... q 0 co v It) 0> '" ~ t:. '" '" .... co ('")
~ :3ii: ~ ~ N o:i m o:i ri N m .0 ....- N N M
., 0> '" ('") It) ....
~ ~O '"
W ~&:
III
:t
W
U u..VI '" <0 0> '" It) ..,. <Xl 0 ..,. <Xl N 0 '" <Xl <Xl 0>
W 0> Cl ~ ~ 1: 0 N ~ 0 0 ~ N '" 0 0 '"
0 Og: v .... ..,. <Xl '" 0 "t N 0> ('") 0
.0 ci m ci m .; m ~ .; N ri ~ ci o:i o:i ci
0 I-z '" <Xl .... .... Ul 0> ('") N co co 0 0> ..,. co ..,. It)
W mW N v ~ ~ q N ('") q '"
0 Ofij .;
Z
W U~
~ .l!l
< m N ..,. V ('") ('") co .... ('") 0 co v <Xl N ('") <Xl ('") c:
W N co L{) N 0> ('") co .... Ul ~ N V ~ 0 Cl 0> '"
>- WO .... <Xl. "t 0> 0> .... ..,. ~ ('") ..,. Ul ":. Cl ('") E
W :JW ..; Cii ;;; o:i en N ri ri .0 1: N ....- ...: 0 ci ri '"
J: zz N .... .... 0 ..,. '" co ~ "" co 0 '" ro
I- W~ N ..,. ~ N V ~ 10 U;
~ fij~ .; ro
0 ~ "0
u.. c:
m- III
"" ('") M ('") 0> V 0> co co "" "" "" L{) 0 c:
<Xl 0 q Ul <Xl 0 V <Xl '" 0> 0> 0 <0=
VII- ..,. '" 0 N 0 N ~ 0>. t:. N ('") .... "" B
:3ii: -:. ::;: ri N N m .0 .; en .0 .; N 10 Vl
Ul .... 0> Ul ('") '"
~O ~ co '"
Cl&: 15
c:
Ol
c:
">.
0 5 ('") co '" ;;; ~ co v "" N 0 0 "" '" c:
u..m III
~ ('") 0 ('") "" N 0 0 ~ N 0 0 10 Co
og: ('") 0 0> .... .... N 0 ~ "t 0> <q E
I-Z ri ...: N ci .0 m N N ..; N ",' Cii o:i a5 ::;: 0
0> .... 0> .... co 0> co :! co ~ ~ ..,. co <.l
VlW q co ..,. "" q "t ('") co <.l
ti 0> ~ ~ co III
UW '"
~ '"
~ CIl
!z m <Xl ..,. v 0> ~ L{) 0 N 0 <0 ..,. <Xl <Xl ('") N
<Xl ('") co N 0> <0 0> ..,. It) '" N ~ 0> 0 10
0 WO L{) 0 ('") q N 0 0> <Xl ('") ..,. ":. v
U :JW ...: en IIi Cii a5 ai a5 .0 .0 1: N ...: N ~ ....-
zz 0 1: v ('") ~ co In co 0 <Xl 0 0 co
..J W~ "t In 0> ~ ~ ~ ~ v. v '"
< >< ....-
I- ww
0 ~
I-
VI W
0-
I- en <(
U ~ z u
~ w en
0 tii
l- s: 0:: w w
'" <(
Z -' f!! Cl 0:: OJ
0 <( .... z
s: z -' en tii w
U Cl w <( '" w ~
.0 z w f!! z ::; 0: 0:: > W
uw ti <( ~ 0: w 0 <( <( 0:: :I:
~ Z > ::; 0- en .... 10
~tii w iti en
W :I: ::; 0 w 0:: Z
en .... -' 0:: ::; ~ ::; 0 '"
-..J .., w '" w en
mo.. 0 w 0 > U 0- t;; -' z 0:: III
s: ~ <( 0 N ~
W:t'" ~ > w w 0 '" ~ Q
!Qog a.. 0: 0- Z > 0:: 0:: Z en s: u
a :I: <( 0- <( Z W <( :I: 0:: ::;
~UN 0 0- Cl :::J (!) iti
w w u ;;; ~ 0; :c u 0::
&:LL~ 0- 0:: <( w en 0 iti z w
<i w w s: '" > ~ ~ w 0:: ....
wO'" > III 0:: '" 0; en en III ::; Ii:
I-w~ (!) 0 w z <( 0:: en <( <( ::l en en :I:
-' 0- ~ a 0
Z..JW iti U -' -' <( 0:: 0:: i: w w ~ 0
W:llll <( ~ W 0- -' -' :I:
><c:;o en u 0 i: 0:: :!: w w w z !Q !Q '"
<i 0:: en 0 a
www :I: Z W W <( 0:: '" OJ :::J ~ >- >- III 0::
ZJ:U .... ~ :'i a :::J w 0 ii: :'i :'i z z <( w
cr: -' :::J 0 '" .... z en z z Z ~
wuw 0 ~ <( :'i w :'i u :::J .... .... w :::J :::J <(
I-VlC z :I: I- :> en u.. u.. s: en en a 0
State of Florida
Department of State
I certify from the records of this office that TENEX ENTERPRISES,
INC. is a corporation organized under the laws of the State of Florida,
filed on January 7, 1998.
The document number of this corporation is P98000001618.
I further certify that said corporation has paid all fees due this office
through December 31, 2009, that its most recent annual report was filed
on April 15, 2009, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution.
Given under my hand and the Great Seal of
Florida, at Tallahassee, the Capital, this the Tenth
day of July, 2009
~o
Secretary of State
Authentication ID: 100158369421-071009- P9800000 1618
To authenticate this certificate, visit the following site, enter this
ID, and then follow the instructions displayed.
h Ups:f fefile.sun biz.orgfcerta uthver .htm I
M
...
,0'
'N
.0
M
M
,0 .
;'ri.
01'.
'0
.M'
'8.
.......w
..~.~;
'H', ..
E-<<:
j:<....
'''.P9.'
,g;;(.'
'p:O'.
.' .....lJ:l
. ....H\:.
.;~'}
'. .m&1.
.!("::re~.. :
.8 :",: ~ifI."
".~"'n_"""
:9"~
i.;;J '~
:-~':..~S:;..
...,.tIl~ ..
'~"..~~,.'
.:~..HO
'(I):.l'J)H:. JQ
,'.' pe,t' :2i
.......:.JQtJ... .'.:
,:::::P;/.I':&:l
'r<t~ . ". m:
'OE-<<.'Z
.01 '1l:1
.e,tz.. 0
ZO:.H
......'.Bu...."....,.:r
>..- /';<":~
: -', '.'--, .
:~':': ..
'1l:1".:';":
Q ..
L()
J'-
<;\.!..
~....
co
<.D
o:::t
.~
<(
":.;:;:i:.::~~'
'rJ'jY,:~':
"~,~;~.
'Q)'" .
,1.)0.
:cliH
":IISO.
...a~".
.u',~~~:'...,.
;'<:gt:P~': .
"r"E-f Hto (!).
N . (J E-t s:l t:J
~ '..c ~ 0 -< .
...... ~1l:1~.
:0\ E-f U U1 ..
~.... :2i . -rI Q)
..0001>,I.J'
.0\ '0 H O',.IIS'
Oo'k'tS
...._,...~i;:I:.~'.:~.............:..
.......... 0'.:. H'
:9 :r-. G) 0
,.;~ :~.81tn
.... '13:1. '.'IIS ..
. NC)'tSkk
,N', QlG) -..f .
...Q) s'tS Pt.
..P ',I:Ut. s::x .
M E-t = Pl':&:l
o
\0
....0
'('1) ,
'('1)
: '."
.....'..:j'
,.6 '1kI
. .....~....:.
. -" ;,.,
tilE-<<
Q.Il:1~
001P;
OHO.
,..~~UIIl
......~......u
. Cits~
. ...t~j:Q"
. .' - - . . . ,
.. .. "-'.'.
HIl:1~O
8~~~
.01Z1'".Pt
... >=62
~f4ano
QHCXlPi
o
(!).. ,
~<'
Cl>t
i.~
..~E-<<
"":Ii:l
mp:
'lZlU' .
..:IlZl.
. ,.p:t,'
,e,....
.....:..:..'.~.
"o;,:~'
'::;"ffi
:~..
5
.,W
n:
.CIJ
....~.
~.
5
..0-
'!{2
o
E-<<
.01
H'
'Sri~: '.
'. ...2:
'I':&:l~
'HI3:1
H:>....
'1:i0
, . ii! t!>,'
'.U'
\D
co
o
o
o
oqI
o
r-f
r-f
en
o
~
~
a
w
zen
o
H
8
~
'H
PO
C!)~
r:1~
t:t:0
~
..:1
~C!)
ZZ
OH
HtIl
tIlZ
tIlrz1
\<( 'r:1tJ
C r:.H
_ 0..:1
0::: ~\" p:: r
o..t'~~'l
"\..J ~~
U. ~,tIl IJ..
I U. lici, p,
q.'m~ ~,'
W tIlH \, \'
~ r:1 I
<( ,;,"ZZ J .'
t-' '140., p::
en ~~ fg.
~u
P rz1
I r:.p::", tIl
08, Z
tIl r:1
HZ tJ
.ZO H
r:1 (:,) ~
r.:';~'~" "
~
~
p.,
'l,r:1'
,,\"Q ,
. ~l,' ,
~I
'\
'I
: 1
~
\
I,
I
l. 1- \
-01 II
r:.
;, ~,; 1'. ~t II
00 i''1'rl!.I.
't ';,: "'~.;.: ' ,if \.
0) "I'"
m ,:. 1,
, !' ~,
\0\
CO'J
.; "., 1/ '..... '
\0'- -~. \J
\D ' " \ J..f
M r;"Q)
\D .uo
r-f,;.~ ~1""'1
l/l'i,' Cd 0
r-f .r:: N
.g Q.~..
U 'r:1 ~ r-f
4' .,p:: H' 0 M
"0 r:.
E-tHOlC!)
U8~P
~ &i ;~ ~
~~<~ ~
Otll>.u
UHOm
:; J..f ro
..:1'~ ~
'~ ~'Q>5
J':l 'Q) ~.r!
~ Z.Q-u.u
-, J':l '-0" m
~ it!) ro 'J..f J..f
o Q) Q).r!
A ~Iii~~
'r-f '. E-4 ~~ng M
Of'. ~
l"-
N ' -'.,' ,.:~lfJ
~"w{.;\'t"
~
.
. ~ I 'f
:tt:; .,'
o ,,,' ,~\, ~t':'.
<! "~ ,'.'"
J '1<." '.
'-.;,
: t \.
U'
( .:;2;
R
Z'
o 1tl
H 0
8 ~
U M
P M
~
8 ..:1
tIl r:.
z
o
U
~O
~~P::tI:
M~l' U
jY~ j~. ~ ~ r:i
1c2:. E-t ~
t:>tI:>t
:(;) tIl ~
1!1'''\:'6~'~'~
Q~rz.~
'J':l
>~OE-<<
, rz1..:1 r7i tIl
't:> ~,~t' r:a
Ol~H~
v
I I, ~ '
..
o
t!J
~
Q>t
p::
.~
~E-t
M
UJ~
MU
..:1ri!
~[J)
fa
U
~
:5
>-
co
o
UJ
0:::
::>
a
'UJ
'0:::
en
<{
~
Q..
en
o
II II
1 t !.
E-t
UJ
H
p::~
UO
ri!~
Hri!
H>
~o
~t!)
U
~
ACORO@ CERTIFICATE OF LIABILITY INSURANCE I DATE (MMlDDIYYYY)
~ 6/11/2010
PRODUCER (813)890-0415 FAX: (813)885-4311 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
PrimeGroup Insurance Services, Inc. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
5440 Beaumont Center Blvd. ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Suite #445
Tampa FL 33634 INSURERS AFFORDING COVERAGE NAIC#
INSURED INSURER A: FCCI Insurance Group
Tenex Enterprises, Inc. INSURER B: Employers Preferred Ins. Co.
850 SW 14th Court INSURER C:
INSURER D:
Pompano [Beach FL 33060 INSURER E:
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTVVITHSTANDING
ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS. EXCLUSIONS AND CONDITIONS OI5UCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR [ADD'L TVDO: no: IN~III'4"'r.o: POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS
0
~NERAL LIABILITY EACH OCCURRENCE $ 1.000 000
~ 5MMERCIAL GENERAL LIABILITY ~~~a~~S Ea occurrencel $ 300 000
A - CLAIMS MADE W OCCUR pLOOO4B61 6/25/2010 6/25/2011 MED EXP (Anyone person) $ 10 000
~ Blanket Addt'l Insd PERSONAL & ADV INJURY $ 1.000 000
- GENERAL AGGREGATE $ 3 000 000
~'LAGGREr~!r LIMIT AnS PER: PRODUCTS-COMP~PAGG $ 3.000 000
X POLICY ~~P.T LOC
~TOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000
~ ANY AUTO (Ea accldenl)
A '-- ALL O'tvNED AUTOS ~OOO5134 6/25/2010 6/25/2011 BODILY INJURY
$
SCHEDULED AUTOS (Per person)
-
~ HIRED AUTOS BODILY INJURY
$
~ NON-O'tvNED AUTOS (Per accident)
- PROPERTY DAMAGE $
(Per accident)
~RAGE LIABILITY AUTO ONLY - EA ACCIDENT $
NN AUTO OTHER THAN EA ACC $
AUTO ONLY: AGG $
~ESS I UMBRELLA LIABILITY EACH OCCURRENCE $ 3 000 000
X OCCUR D CLAIMS MADE AGGREGATE $
$
A M DEDUCTIBLE PMsOOO57B61 6/25/2010 6/25/2011 $
X RETENTION $ lO.OO( $
B WORKERS COMPENSATION X 'NC STATU- X IOJ~-
AND EMPLOYERS' LIABILITY Y/N
ANY PROPRIETORlPARTNERlEXECUTIVE D E,L. EACH ACCIDENT S 1. 000 000
OFFICERlMEMBER EXCLUDED? ~CV70614B2 6/30/2010
(Mandatory In NH) 6/30/2011 E,L. DISEASE - EA EMPLOYE $ 1 000 000
~~~Mts~~~~~1~~s below E.L. DISEASE. POLICY LIMIT $ 1. 000 000
A OTHER Inl.and Marine ~OO5136 6/25/2010 6/25/2011
DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS
CERTIFICATE HOLDER
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION
DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL ~ DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO 00 SO SHALL
IMPOSE NO OBLIGATION OR LIABILITY OF ANY KlND UPON THE INSURER. ITS AGENTS OR
REPRESENTATIVES.
AUTHORIZED REPRESENTATIVE ~c-:: 7~,,~1..-
Ed Ellsasser
ACORD 25 (2009/01)
INS025 (200901)
@ 1988-2009 ACORD CORPORATION. All rights reserved.
The ACORD name and logo are regIstered marks of ACORD
ACOBQ. CERTIFICATE OF LIABILITY INSURANCE 8il~
THIS CERTlFlCAlE IS ISSUED AS A MATTER OF IHFORllAnON
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOlI NOT AMEND, EXTEND OR
AI.: E G DEDI PO W.
,~ J05 122-7100 FAX (305)551-4294
Collinsworth, Alter, Fowler' French LLC
P. o. Box 9315
M...... Lakes, FL 33014-9n5
nc
INSURERS AFFORDING COVERAGE
MUll!RA: Aa AIle can Ins Co
IIiSUA!R It
IICSURIA C:
IMSURER D:
IN9UIlER E:
MASCI
THE PCUClES OF INSURANCE U81ED BElOW HAVE BEI!N ISSUED TO THE tHBURED NAMED ABOVE FOR THE POLICY PeRIOD INDICATED. NCnWITHSTANDING
Nff REQUIREMeNT. TERMOR COHDmON OF MY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, 'THE INSURANCE AfFORD!D BY THE POUC1E8 DESCRIBED HEREIN 18 SUBJliCT TO ALL lHI! TERMS. EXCUIS1CNS AND CONDITIONS OF SUQi
POUCIES. AOOREOATE LIMR'8 SHOWN MAY HAilE IlBN AmJCED BY PAID CLAIMS.
DEDUCTl8lE
RmNTlON S
WDIlIWIaCCIIJIDIIA1lON AD
IIIJILOYIII8' UAIlUl'Y
8 =~~~
~~llIlOw
A r action. Indemnity
ENO'T MH-I070
END'T 101-1010
LIIUI'I
S
.
IolmEllP(An,_pawI) .
PIRSONAL & UN DWR'I' .
ClIJlIRAI.AOOIlEOAlE .
PROOlJCl8 . CClI.IPlCP AOO .
CXIIolIIlHEO 81NC1U! L&lrr
lEa ea:IdInO
.
BODILY DWRY
CPw-'
,
IICXIL Y INJURY
(PIt eacIdelIll
.
PIlOPERTY DAMAGE
CPQr ICICfdIIlO
.
AUIOClNLV. fA ACCIDfHr
EAM:iC
ADO
01IiER IHAH
AUlOONlY:
BACHOCClJIlMHCE
AOOIlEGATE
x C A1Uo
HUN05711&66 04 17 2010 04/17/2011
~1'lOIl C# OPIMTIOMS/LOCA1IONa/VlHlCLU/Ill'Q t/It(lMOt AIIlllID 8Y IJIIlClIlIIIIDIr lI'a:w.PlCMIlllM
City of Sunny Isles Beach
18660 Collins Avenue
Sunny Isles Beach, FL 33160
0M0uUJ IMf 0' 1ICa AlIOVIlIll8allllID I'Ol,IgIJIK ca-,o , ,~ BIHlIla 1ICa
IDIIlA1IlH DAn TIIUIGf. 1HIllIIIINlI DIIIIIWl ft.l. PlDUwtI TO 11M.
-L DAft WIlmINNCmCe TO TtClI CD'IllICATl! "CIUllA NAIIID TO TIl& un.
IV1' PAILWlI TO IIAIL lUeM NCmCIIIHILL IIIPOIIIIlO ClIUlIA'nOH OR UAIlUI'I
ClIlIItf IlIIUlIII'GN 111111III"" n AaIDIrt Oft IlIPIlIIDffATWa
AUIMllRIZIIIIlDIIIIIINl'A1WI ~~v-
]Ulti
ACORD 25 (Z0011D8)
OACORD CORPCRAnON 1888
~
ACORD' CERTIFICATE OF LIABILITY INSURANCE I DATIl (MM/ODI'fYV'tJ
~ 8/16/2010
PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
HSBR Insurance, Inc. ONL V AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
9055 SE Bridge Rd ALTER THE COVERAGE AFFORDED BV THE POUCIES BelOW,
Hobe Sound FL 33455 INSURERS AFFORDING COVERAGE HAlCII
IN8URED Palm Beach Marine ConstrucUon Sareco
1410 Forsythe Road INSUllER D:
IN!ltIAOA C:
West Palm Beach FL 33405
I IN!:tIAOAr:.
COVERAGES
THEPOUCIESOFINSURANCELISTEDBELOWHAVEBEENISSUEDTOTHEINSUREDNAMEDABOVEFORTHEPOLlCYPERIOD INDICATEO. NOTWITHSTANDING
ANV REQUIREMENT. TERM OR CQNOmON OF ANY CONTRACT OR OTHER OOCUMENrWITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN. THE INSURANCEAFFOROEDBYTHEPOllClESOESCRlBEDHERElNISSUBJECTTOAlI. THETERMS,EXClUSIONSANOCONOITIONSOFSUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAlMSm:
INBR IUlrn POLICY NUMBER POLICY Ul'Ii POLICY &xPIRATION UlIUT8
..,!!!NERAL UASIUTY CE I.
OOMMERCIAL GENERALllABltlTY DAMAGE TO RENTED I.
- ClAIMS MADE 0 OCCUR
I.
~
I ftftftftAUU Y I.
~
I "E--ft.. I.
I--
nlfL AGG~n LIMIT NOnS PER: l>Aomtr.Tll _ t'nuplnp ""0 .
POLICY ~~ LOC
~TOM081Lll LIABILITY COMBINED SINGLE UIoIJT . 1,000,000
A Nt( AUTO 25CC30730910 07/30110 07130111 (Ell acd4aftt)
-
...!. AU OWNED AUTOS BOOlL Y lNJ\JRY
......~) .
- SCHEDULED AUTOS
- H1REIl AUTOS BODILY I"'JURY
(pet lIcddcnt) .
- HOH.()WNED AUTOS
PROPERTY DAMAGE .
IPet~)
HOE UASIUTY . I.
Nt( AUTO OTHER THAN "......1" t
AUTO OHL Y; ..nn. .
pESSI UMBRELLA LlABIUTY I
OCCUR 0 ClAIMS MADE t
.
R DEDUCTIBLE .
I AETEHTtnN t t
WORKERS COMPGHSATlON I we STA1\J-.1 X 10nt-
AND ENJ'urtERI' UAIIIUTY nvtj
ANYPROPR~O~ART~ECU EL, t
OFFICERlMEMBER EXClUDW? ~L, OISl'A!Il' _Po ' t
IMII.clalery hl NH)
1~~~~crlllol/tllle1 E.L 0"''''''''' - POLICY LIMIT I.
OTK&R
I
DE8CRlPTlOM OF OPERATIONS/LOCATIONS / VlIH1CLlISI &XCLU8lONa ADDED BY EHDORB\!MIIHT /SpaCIAL PROVlSlOH8
CERTIFICATE HOLDER
CANCElLAnON
SHOULD NlYOFTHB ABOVlI DESCRllm POUClI8BE CANCIiLLED DEFORE THIIEXPlRATlON
DATV THIREOP. THB 188UtNO tNSURER Wll.L ENDEAVOR TO MAlL _ DAYlI WlUTTEH
Oty of Sunny Isles Beach NOTlClI TO THE C&RTlPlCATIl HOLDER IWIm TO THE LEFT. BUT PAlLUftll TO co SO IHALl.
18660 Collins Avenue IMPOSE NO OBUOATlON OR LIA8lUTY OF ANY KtND UI'ON THE IH8URER, ITlI AOEHTB OR
Sunny Isles Beach, FL 33160 118DARSI!HTATNIIl~
AUTIIOlUZEII RURl!8INTATM!
ACORD 25 (2009101)
@1988-20011 ACORD CORPORATION. All rights ",served.
The ACORD name aod logo are reglsterDd marks of ACORD
Addendum No.1
CITY OF SUNNY ISLES BEACH
PROFESSIONAL CONSTRUCTION SERVICES TO DEMOLISH AND
RECONSTRUCT THE HISTORIC SUNNY ISLES BEACH/NEWPORT FISHING PIER
AT PIER PARK
CITY RFP NO. 10-07-02
To All Bidders:
Bidders for the above-referenced project shall take note of the following changes,
additions, deletions, clarifications, etc. to the Plans and Specifications, which in
accordance with the Contract Documents shall become a part of and have precedence
over anything shown or described otherwise.
~ Tuesdav. Auqust 3. 2010 - Pre-RFP Submittal Conference Summary Minutes
~'o ~",,1);
Addendum NO.2
CITY OF SUNNY ISLES BEACH
PROFESSIONAL CONSTRUCTION SERVICES TO DEMOLISH AND
RECONSTRUCT THE HISTORIC SUNNY ISLES BEACH/NEWPORT FISHING PIER
AT PIER PARK
CITY RFQ NO. 10-07-02
To All Bidders:
Bidders for the above-referenced project shall take note of the following changes,
additions, deletions, clarifications, etc. to the Plans and Specifications, which in
accordance with the Contract Documents shall become a part of and have precedence
over anything shown or described otherwise.
Response to Additional Questions:
~ From Shoreline Foundation. Inc.:
1. Is a specific bid bond form required?
It must be in a standard form acceptable to the City Attorney.
2. Is there a specific bid form to be completed?
No, but the more information you provide, the better we can analyze the
submittals.
3. If the proposal is to be lump sum, should bidders assume required quantities
or utilize the quantities supplied as the Summary of Pay Items included on
sheet B-4 of the permit drawings? There appears to be a discrepancy as to
the pile quantities as shown on sheet B-19 Pile Data Table and the
aforementioned Summary of Pay Items.
Please break down the price into units as much as possible, again it allows us
th opportUnl y work and affords you protection if one item is
out of line (such as on a miscalc . so that we can still consider the
proposal.
c::-
t( PrM l 0 ~fU).:L
Addendum NO.3
CITY OF SUNNY ISLES BEACH
PROFESSIONAL CONSTRUCTION SERVICES TO DEMOLISH AND
RECONSTRUCT THE HISTORIC SUNNY ISLES BEACH/NEWPORT FISHING PIER
AT PIER PARK
CITY RFQ NO. 10-07-02
To All Bidders:
Bidders for the above-referenced project shall take note of the following changes,
additions, deletions, clarifications, etc. to the Plans and Specifications, which in
accordance with the Contract Documents shall become a part of and have precedence
over anything shown or described otherwise.
Response to Additional Questions:
~ From Brooks and Freund. LLC.:
1. Sheet SD-2 shows Mid-Pier and End-Pier cleaning stations. Are we to
provide? If so, please provide detail.
Cleaning stations are not included in these plans. Sheets SD-1, SD-2 and
SD-3 are plans prepared for a previous design and have not been updated
to reflect the current plans. They are provided for reference to existing
utility locations only. Refer to all other provided plans sheets (A, B, E, F,
M, P, & S) for work scope.
2. Sheet SO -2 shows lighting and hose bibs that say "refer to arch & struct"
plans. These are not shown on the arch, struct, plumbing, or electrical
drawings. Please advise if we are to include. If so, please provide details.
(;?ier lighting is only Turtle approved bollard lights. The only hose bibs on
plans are at east ancf west sides of the restaurant building. Sheets SD-1,
SD-2 and SD-3 are pia s prepared for a previous design and have not
been updated to reflect e current plans. They are provided for reference
to existing utility locati s only. Refer to all other provided plans sheets (A,
B, F M, P, & for work scope. Pier lighting is only Turtle approved
(\A, \ D ~AO.1.-