CONSTRUCT GROUP CORP.
STATE CERTIFIED GENERAL CONTRACTOR
STATE LICENSE: CG-C062818
Ph: (305) 824-8845
Fax: (305) 824-4945
12101 NW 98th Ave. Suite # 8
Hialeah Gardens FI, 33018
Company Name: Construct Group Corp
Address: 12101 NW 98th Avenue Suite # 8 Hialeah Gardens, FL 33018
Business Overview:
Construct Group was founded back in 2001 as a general contractor company, dedicated
to Flatwork Jobs (sidewalk, curb and gutters, etc) and Structural Jobs (retaining walls
and small bridges). Since then the company growth each year with revenues in the last
2 years as follow:
2008 Revenues - $13,960,808.00
2009 Revenues - $11,208,994.00
Name and Address of principals:
Juan C Quesada - President - 18250 SW 106 Street Miami, FL 33196
Jorge I Pulles - Vice-President - 8440 NW 169th Terrace Miami Lakes, FL 33016
Gustavo H Graupera - Secretary - 19281 SW 62nd Street Pembroke Pines, FL 33332
f
1 . ~
5. () () '" () 0 ()
If> 0 0 < 0 0 0
~ " " CD " " "
0
~ ~ -< ~ 0; ~
5. 2 2 c 2 !b 2
<0 5l 5l " 5l 5l
0 G) G) 15. If> G)
0 c G) 0
" 0 0 CD 0 0
0 "0
0; C C 0 C CD C
"0 "0 0 "0 "0 "0
en "
() () 0 () 0 ()
"0 0 0 0; 0 en 0
'" -a -a -a -a
" en 5l
~ (ii" :T :T 0. :T
~ 0- '" ill '" " '"
a. a. a.
s. 0 =l: 0 '" 0
Ii' a: o. "
5. a. ~ a. a. a.
If> <0 0 0 ill 0
c '" 5. '" '"
0- '" ::::
~ 0 g- 'P 0 o. 0
2 !il. c: !il. ~ !il.
0 <0
C -< CD g- 5. g-
O; " ::;: c: <0 c:
'" CD c: <0 !" <0
" ::;: CD CD CD
a. g- " 0; 0;
If> c: 5. 0 0
C <0 <0 0 0
"0 CD 5. " "
~ 5' 0 !!l !!l
~ C 2 2
2 !!l. a. 5l 5l
0 ~ 5. 0. 0.
C <0 " "
0; "0 0 5. 5. Z
:T
0 0 '" 0 0 III
0 < :J C C ..,
:J c: :J a. a. ..,
0 CD ~ 5. 5. III
0; 0 CD <0 <0 -
en 0 >< a. a. e:'
0
'" " '" CD CD (I)
CD 3 3
:J 5l <
a. !!l. Q. Q. C
0. 0. ,. ,.
ill :J .:J 0. 0. (I)
:::: 0 :J :J l/l
o. "2. a a n
~ 3 CD :!.
CD CD
Z ~ >< >< "0
5. ~ ;:. ~ ~ ~
<0
!" .... 5. 5. 5. 0
'" cp <0 <0 :3
:J g- g-
a. If>
)> C c: c:
0- <0 <0
< !!l
CD !" .CD
0 2 "2. ~
0
0 c CD ;:.
" 0; ~ CD
CD 0
CD '" ;:. 0
0 " 5. :J
:T a. 0
0 If> cp 0;
0- C If>
CD "0 C en
;:a CD 0- "2.
?- ~ ~ CD
() c 2 j1>
0
G) 0 C If>
() C 0; c
0; 0-
Vi. 0 '" ~
5. 0 :J 2
0 :J a. 0
:T 0 If> C
'" 0; c 0;
cO en "0
CD '"
CD '" !1 :J
Q. :J a.
a. 2 If>
~ 0 0 c
;:. 0 C "0
:J 0; ~
5. 0
<0 0; 0 !!l
"2. en 0 2
:J
CD 0 0
j1> ill 0; C
3l CD 0;
0 '"
~ :J
a.
5.
'P
PROJECTS COMPLETED LAST FIVE YEARS
CGC # Project No. Project Name Proj End Contract Amnt
06-46 249102-2-52-01 BRICKELL BRIDGE 2006 $623,687.00
06-47 Power Line Rd 2006
06-48 MDX SR 836/57 A VE MDX 2006 $32,255.25
06-49 C MIAMI AVIATION Airport Postal Bldq. 2006 $120,743.00
06-50 403578-1-52-01 POWERLlNE BRIDGE. 2006 $318,898.00
06-51 Martin County 2006
06-52 Hurricane Wilma Repairs 2006
06-53 C 412637-1-52-01 167 STREET 2006 $157,398.63
06-54 C 409136-1-52-01 A 1 A 17 ST Causeway 2006 $94,519.00
06-55 Flaminqo Rd 2006
06-56 MDX 836/826 2006
06-57 C 227952-1-52-0 Commercial Blvd 2006
06-58 C 414761-1-52-01 Kendall Drive 2006 $125,438.95
06-59 C 415283-1-52-01 Sheridan & 1-95 2006 $113,736.00
06-60 SW 27th Ave 2006
06-61 407633-2-52-01 Leieune Road 2006 $86,370.00
06-62 C 249973-3-52-01 RCF & MIC/MIA Pile CaDs 2006 $1,224,046.00
06-63 CITY OF HIALEAH PUMP STATION 106 2006 $103,100.00
06-64 C 411440-1-52-01 US-1 (Sunrise to Oakland) 2006 $492,131.50
06-65 412481-1-52-01 SW 7 STREET 2006 $229,494.40
06-66 C 228135-1-52-01 SR7( 441 )Atlantic Blvd. 2006 $31,299.00
06-67 C 412097-1-52-01 Hillsboro/Belvedere 2006 $29,032.80
06-68 C 229781-1-52-01 Glades Rd. 2006 $40,000.00
06-69 MDCPWD County wide Push buttom 2006 U/D
06-70 PRIVATE PENINSULA 2006 $175,120.00
06-71 249528-1-52-01 NW/NE 36th Street 2006 U/D
06-72 Oakland Park 1 West of 1-95 2006
06-73 PT EVERGLADES BERTH 19 2006 $25,034.36
07-01 MIAMI BEACH C.!. VENETIAN PARK 2007 U/D
07-02 C 231736-1-52-01 Racetrack Rd. Bridqe 2007 $210,120.00
07 -03 MIAMI BEACH C.!. Ocean Front 2007 U/D
07-04 C MDCPWD SW 184 STREET 2007 $23,000.00
07-05 C 411321-3-52-01 Sheridan & 1-75 2007 $377,232.50
07-06 228189-1-52-01 SR 7(Oakland to Commercial) 2007 $171,074.00
07-07 415397-1-52-01 1-75 COLLIER 2007 $315,400.00
07-08 City of Miami SDrina Garden Bridae 2007 $191,000.00
07-09 C 415272-1-52-01 Davie Blvd. & 1-95 2007 $52,329.00
07-10 C 405641-1-52-01 Biscayne (67to78) 2007 $6,100.00
07-11 C MDCPWD NW 62nd Street 2007
07-12 CMB CMB Parkinq Garaqe 2007
07-13 CMB Normandy Shores 2007
07-14 PRIVATE Ten Museum Park 2007 $6,500.00
07-15 C 249835-2-52-01 Biscavne (5to13) 2007 $16,850.00
07-16 C 228073-1-52-01 Sample Rd. & 1-95 2007
07-17 N/A 2007
07-18 407630-2-52-01 Sunny Isle Blvd. 2007 $27,602.00
07-19 PRIVATE Viele House 2007 $23,395.00
07-20 Port Everqlades Berth 26 2007
07-21 228180-1-52-01 Davie Blvd (SW 9 to US 1) 2007 $176,612.00
07-22 2005GOB 1001 R Belen Pump Stations 2007
07-23 406097-1-52-01 Turnpike & Commercial 2007 $153,900.00
07-24 C 418236-3-52-01 Kendall Dr 1 Bird Rd. 2007 $36,385.00
07-25 418048-1-52-01 Sunrise Blvd (SR7 to 34) 2007 $1,299,591.50
07-26 C 403577-1-52-01 Atlantic Blvd. (NW 27 to CSX RR) 2007 $62,148.00
07-27 C 44356 Oak Grove Park 2007 $85,200.00
07-28 B-40691 Miami River Greenwav 2007 $195,639.50
07-29 411432-1-52-01 SR A1A ( Ocean Dr. ) 2007 $375,962.00
07-30 250173-2-52-01 NW 7 Ave (NW 36 to 79) 2007 $111,776.00
07-31 C 418238-1-52-01 SR 71 NW 27 Avel NW 119 St 2007 $91,832.60
07-32 C 20060227 NE 2nd Ave (84 to 91) 2007 $1,835,525.80
07 -33 C 414643-1-52-01 12 Ave (SW 13 to NW 7) 2007 $556,744.10
07-34 C 411440-1-52-01 US-1 Sianal & Liahtina 2007 $5,000.00
07-35 C 249640-1-52-01 NW 12th Ave Bridae 2007 $5,600.00
07-36 Citv of Lauderhill SR 7 (NW 12 to 26) 2007 $65,771.00
07-37 C 249937-5-52-01 MIC/MIA K-12 Footer 2007 $68,537.00
07-38 C 418236-3-52-01 Bird Rd & SW 117 Ave 2007 $2,750.00
07 -39 C 49549-A Sharman Park 2007 $33,725.00
07-40 Sawqrass Expresswav 2007 $92,520.00
07 -41 C 20060439 NE 2nd Ave 191 to 105) 2007 $597,955.50
07-42 C Mount Sinai 2007 $12,820.00
07-43 C Everalades National Park 2007 $23,000.00
07-44 C E-29947 Cruise Blvd 1 Port of Miami 2007 $67,250.00
07-46 C 227776-1-52-01 SR 7 (SR 848 to SR 818) 2007 $147,361.00
07-47 422748-1-52-01 University Dr & SR 84 2007 $44,025.00
07-48 C MIA Fuel Valve Pit 2007 $804,823.25
07-49 C Miami-Dade Misc. Concrete 2007
07-50 Clendenen Residence 2007 $36,172.00
07-51 C 249937 -6-52-01 MIC Bridae 10A 2007 $550,115.58
07-52 C 419240-1-52-01 SR 5 1 Broward Blvd - NE 4 St 2007 $16,731.00
07-53 414621-1-52-01 SW 112 Ave (222 St - US1) 2007
07-54 C SW 127 Ave(SW 120 - 88 SO 2007
07-55 C SW 97th Avenue 2007 $63,000.00
07-56 C 415367-1-52-01 Davie Blvd/SW 38 to 25 Ave 2007 $9,010.00
07-57 C 413797-1-52-01 University Dr/C-14 -Sample Rd 2007
08-01 C 413796-1-52-01 University (Pines Blvd-Griffin) 2008 $290,201.00
08-02 190738-1-52 Turnpike & SW 49 St 2008 $19,875.00
08-03 414647-1-52-01 TurnDike(Golden Glades - 826) 2008 $22,500.00
08-04 C TroDical Park 2008 $16,984.50
08-05 Miami River (Seament C) 2008 $26,900.00
08-06 C 405641-3-52 -01 Biscavne(NE 78 St - NE 87 St) 2008 $14,700.00
08-07 C 413839-1-52-01 US1 (C-15 Canal- TroDic Blvd) 2008 $264,594.00
08-08 Port Everqlades (Bollards) 2008
08-09 228075-1-52-01 Powerline (58 Ct - Atlantic Blvd) 2008 $398,313.00
08-1 0 Police Precinct(NW 5Ave-11 SO 2008 $16,450.00
08-11 6151 Bailev (North Lauderdale) 2008 $36,963.50
08-13 C 20070722 ADA Accessibilitv to Bus Stops 2008 $999,999.00
08-14 C 20070723 ADA Accessibility to Bus StODS 2008 $999,999.00
08-15 414622-1-52-01 NW 72 Ave(Flaqler - NW 25 St) 2008 $114,837.20
08-17 C 20070597 Rickenbacker Causewav 2008 $1,312,273.00
08-18 417128-1-52-01 PomDano Beach Service Plaza 2008 $30,844.50
08-19 C 20070683 Sonovoid Bridqe - SW 187 Ave 2008 $356,977.10
08-20 C 2008-07 NW 107 Ave (NW 66 to 74 SO 2008 $87,892.00
08-21 250224-2-52-01 SR 5 (NE 37th to NE 67th SO 2008 $31,500.00
08-22 07-10-02-0-2007 Central Island Drainaae (S.lsles) 2008 $554,940.00
08-23 C 413795-1-52-01 SR 816 (Oakland Park Blvd) 2008 $80,730.00
08-25 C 20070487 SW 157 Ave (SW 120 to 112 St) 2008 $518,865.00
08-26 PomDano Beach Park-N-Ride 2008 $125,027.78
08-27 B509B Okeelanta Bridqe Replacement 2008 $750,702.00
08-28 414635-1-52-01 SR A1A (MacArthur Cswy) 2008 $51,200.00
08-29 C 413841-2-52-01 West Atlantic Ave (Palm Beach) 2008 $166,786.00
08-30 C 249937-5-52-01 MIC - Cofferdams 2008 $322,860.00
09-01 C 20070616 SW 136 St (SW 139 to 152 Ave) 2009 $80,550.00
09-06 C 415322-1-52-01 University Dr (Oakland to Southqate) 2009 $25,902.50
Municipalites
Florida Department of Transportation District 4
Isa Nunez
Tel: (305) 986-2551
Miami Dade County
Ron Gibbons
Tel: (305) 281-7611
Miami Dade County
Luis Franqui
Tel: (305) 281-8949
Contractors
Weekley Asphalt
Dan Weekley
Tel: (954) 689-0603
Community Asphalt
Manny Aguiar
(305) 829 0700
H & J Asphalt
Humberto Lorenzo
(305) 634-3342
....
-
J
. _~.~,~_.-._...._~..._. ._ '.~'_' .._h....._~......._... ... ,.... ...~....-.~,~
~~:h~
'-
,
\
~
Gustavo H. Graupera
Gus has been extensively involved in the Road and Bridge Construction industry over his
20-year career. Prior to joining Construct Group Corp., Gus' career spanned over a 16-
year period with the Florida Department of Transportation where he gained broad
knowledge of road and bridge construction and contract administration. Prior to
graduating from FlU he gained extensive construction experience while working as a
surveyor providing construction layout on multiple Civil Engineering projects.
PROFESSIONAL EXPERIENCE
Construct Group Corp.
Project Manager/Estimator (4/06 - Present)
Coordinate and direct the project's estimating, cost control, project schedules and
construction operations.
Florida Department of Transportation
Assistant District Construction Engineer (01100-04106) - FDOT District 6
Support Resident Engineers and field staff to deliver projects within the statewide
goals for time and cost overruns. Establish work assignments for in-house
personnel and consultant staffing. Analyze technical items and provide innovative
solutions to benefit project delivery.
Resident Engineer (02/95-01100)
Provide the leadership to the Residency Staff to assist the contracting industry in
delivering quality and successful projects. Expedite the resolution of project
disputes via proactive contract administration principals. Assist in the
interpretations of contract documents and provide technical support for
engineering decisions.
McArthur Causeway High Level Bridge - Provided oversight and guidance to
the contract administration team with technical issues concerning the drilled shaft
installation, substructure erection, post-tensioned superstructure construction and
MSE Walls.
South-Dade Buslane Proiect - Provided oversight and direction to the
construction engineering and inspection team during the construction of several
low level bridges, approximately 10 miles of two lane rural cross section, bus
shelters, and Metrorail Station Retrofit.
Project Manager (02/94-02/95)
Supervise assigned project engineers for in-house and consultant projects assuring
adherence to the standards and specifications.
Brickell Avenue Bascule Bridge - Project management and oversight for the
construction of the pile driving, drill shaft installation, seal placement,
substructure concrete, superstructure concrete, structural steel erection,
mechanical and electrical installation, MSE wall erection, retaining wall
placement, drainage, embankment, asphalt placement, lighting, signalization and
striping.
Brickell A venue Rigid Pavement Rehabilitation - Oversee the rigid pavement
rehabilitation project to repair cracked concrete pavement and install new
landscaping and irrigation.
Other Notable Proiects - Venetian Causeway Bascule Bridge Replacement,
Venetian Causeway Bridge Rehabilitation, Quialroost Drive Reconstruction,
US-l Reconstruction in Homestead, Bird Road Reconstruction
Project Engineer (01/92-02/94)
Provided project inspection and contract administration for assigned projects.
Supervised the inspection staff to ensure the adherence to contract documents.
Alton Road Bridge Replacement Proiect - Project inspection and contract
administration to ensure adherence to project specifications and contract
documents during the driving of the pre-cast piles, placement of the substructure,
casting of the superstructure, approach slab construction, bridge railings, erection
of the retaining walls, drainage installation, base preparation, asphalt placement
and final striping.
Julia Tuttle Causeway - Project inspection and administration for the milling and
resurfacing, guardrail installation, landscaping and high mast lighting.
Professional Engineering Trainee (01/90-02/94)
Performed technical engineering tasks in highway administration, highway
location, highway design, bridge design, highway construction and maintenance.
Obtained a broad training of all the Departments within the FDOT.
Victor Mendez, P.L.S.
Survey Crew (04/84-01/90)
Filed calculations and sketches. Construction layouts for highways, sidewalks,
curbs, drainage systems, water systems and buildings.
Licenses and Certifications
Registered Professional Engineer, Florida
Licensed Engineering Contractor, Miami-Dade County
Land Clearing and Grubbing, Plant Construction, Structural Engineering,
Concrete, Excavation and Grading, Paving Engineering
Gerard A. Chenevert
Experience Sept 2008 to Present Construct Group Corporation Miami, FL
Senior Project Manager I Estimator -Foundations
· Responsible for all foundation work. This includes driven piles for bridge structures and
sheet piles for both seawalls and excavations. Cofferdam sheeting and excavation.
· Responsible for estimating and administration of foundation work.
· Examples of my projects such as NE 2nd Ave. Bridge, Mic Earlington Hts
substructure and 72nd Ave. Bridge are listed in the company resume.
June 2002 to August Ebsary Foundation Company Miami, FL
2008
Project Manager I Estimator Engineering Division
· Responsible for driven pile and sheet pile work.
· Expand engineering division to 5 million dollars per year.
· Projects include bridge projects, marine projects and cofferdam projects.
· Major Projects:
o Driven Pile at 9ih Ave. and Coral Way Bridges in Miami, FL
o Several Bollards at Port Everglades, Florida
o Various cofferdams using sheet pile, rock anchors and tremie seal.
o Emergency Flood Wall at Bayou Segnette, Louisiana for the Army
Corps of Engineers
o Bridge at La Posada Retirement Community in West Palm Beach, FL
March 1996 to June
2002
Project Engineer I Asst. Project Manager
· Responsible for 2 bridges at the Ft. Lauderdale International Airport Entrance project.
This included piling, formwork, concrete and precast.
· Responsible for all drawing and engineering coordination for the
the Royal Park Bridge Temp. Bascule Bridge Project. This bridge included a
framework bascule bent. We re used the existing bascule on the temporary bridge.
PCL Civil Constructors
Miami, FL
Senior Estimator
· Responsible estimates throughout Florida. The majority were for the Florida Dept. of
Transportation.
· Responsibilities include finding projects, organizing estimating team, quantity take off,
estimating and schedules.
December 1988 to
March 1996
Estimator, Superintendant, Project Manager
· Involved in all aspects of estimating, project management and field work, building water and
wastewater treatment plants in south Louisiana.
Cajun Constructors
Baton Rouge, LA
Education 1988
Louisiana State University
Bachelor of Science in Construction
Baton Rouge, LA
CONSTRUCT GROUP CORP.
STATE CERTIFIED GENERAL CONTRACTOR
STATE LICENSE: CG-C062818
12]0] NW 98TH AVE. STE # 8
HIALEAH GARDENS FL. 33018
Ph: (305) 824-8845
Fax: (305) 824-3224
To all interested parties:
Construct Group's approach to the demolition and construction of the of the
Pier deviates from the proposed design on one basic concept. We propose
using a smaller pre-cast concrete pile to allow for the construction of the pier
to be done from above without ever disturbing the ocean floor and
minimizing the impact to the marine life of the surrounding area. This
approach will help facilitate and expedite the permitting process with the
Coast Guard, Army Corps of Engineers and any other agencies that could be
involved in the permitting process.
The reduction of the piles from a 24" square pre-stressed concrete pile to an
18" square pre-stressed concrete pile will require the spans to be reduced to
a maximum of 25' in length, but will allow for the construction equipment to
work from above the newly erected spans. The super structure will also be
substituted from a double-tee design to an 18" pre-stressed deck consisting
of 4' wide pre-cast units. The super structure will additionally be post
tensioned laterally at each span for further strengthening of the super
structure.
The sequence of the work will be from the beach area out toward the ocean;
using the new structure as the construction platform for moving forward
with the demolition and construction. Each span will be demolished and
constructed within a three week period amounting to 18 months of pier
construction. Following the completion of the pier, the restaurant will be
finalized within 4 months achieving a substantial completion of the total
project within 22 months. Due to the complexity of the structure a 2 month
period will be needed to reach Final Completion.
City of Sunny Isles
Demolition and Reconstruction of Sunny Isles Beach Fishing Pier and Restaurant
Project No.1 0-07-02
Fishing Pier
Item Descriotion Units Quantity Cost Total
Mobilization LS 1 $ 50.000.00 $ 50,000.00
Turbiditv Barrier LS 1 $ 10,000.00 $ 10,000.00
Removal and DisDosal of ExistinD Structure /Fishinq Pier) LS 1 $ 241.000.00 $ 241,000.00
Cut existina bent Diles to mud line level LS 1 $ 60,000.00 $ 60,000.00
Furnish and Install 18" Prestressed Concrete Pilina LS 1 $ 967.950.00 $ 967,950.00
Furnish and Install 18" Prestressed Concrete Pilina (Test Piles) LS 1 $ 163,620.00 $ 163.620.00
Load Test. Dvnamic LS 1 $ 32.400.00 $ 32.400.00
Embedded Data Collector LS 1 $ 31.000.00 $ 31,000.00
Furnish and Install Concrete Class IV Substructure LS 1 $ 440,000.00 $ 440.000.00
Neoorene Bearino Pads LS 1 $ 77,000.00 $ 77,000.00
Furnish and Install 18" Deck Slab Units LS 1 $ 1,300,200.00 $ 1,300,200.00
Comoosite Reinforced Pioe Handrail - Guiderail (PVC) LS 1 $ 206.700.00 $ 206.700.00
Furnish and Install naviaation liahtina LS 1 $45,600 $ 45,600.00
Furnish and Install bollard liahtina LS 1 $43.250 $ 43,250.00
Fishing Pier Sub-Total $ 3,668,720.00
Restaurant
Item Descriotion Units Quantity Cost Total
Division 2 - Sitework LS 1 $ 734,500.00 $ 734,500.00
Removal and Disposal of Existing Structure (Restaurant) includes removal of
existing stairs and demolition of existing trees. Demoliton will end where the
start of the orooosed walk aooroach beains
Cut exisiting piles under existing restaurant 2'.0" as required for placement of
orooosed Sanitary Sewer Line
Link Security Fence ,
Tree Protection Barrier for South Side Trees
Site Preoeration
Furnish and Install 18" Prestressed Concrete Pilina
Furnish and Install 18" Prestressed Test Concrete Pilina
Trench Drain (cj) beainnina of oier
Division 3 - Concrete LS 1 $ 257,517.00 $ 257,517.00
Furnish and Install Floor Beam Lavout .
Furnish and Install 8" Concrete Slab (from start of new deck to the beginning
of fishina oier)
Decorative Sidewalk at aooroach
Concrete Stairs
Concrete Beam for 2nd floor concrete slab
2nd floor 6" Concrete Slab
Division 4 - Masonry LS 1 $ 67,200.00 $ 67,200.00
Concrete Masonry Units for entire restaurant
Brick Pavers @ Decorative Sidewalk matching existing size, color, and pattern
set in mortar
.'
Division 5 - Metals LS 1 $ 175,800.00 $ 175,800.00
Comoosite Reinforced PiDe Handrail - Guiderail (PVC)
Standina Seam Metal Roofs
Metal Clad Fascia and Soffit Panels
Gutter Svstem
I
Division 6 - Wood LS 1 $ 96,125.00 $ 96,125.00
All Wood trusses, rafters. and structural plywood for standinq seam metal roofina
Walls studs and hardware for 5/8" Gvpsum Board Walls
4' x 8' COX Plywood sheathnq
Staircase
Division 7 - Thermal and Moisture Protection LS 1 $ 12,000.00 $ 12,000.00
Poly-Iso Cyanurate Insulation sprayed to bottom of concrete slab & 1 st floor roofinq
R-19 fiberalass BATT insulation application to the 2nd floor
Division 8 - Doors and Windows LS 1 $ 97,250.00 $ 97,250.00
Furnish and Installation of Impact Glass Doors & Windows
Furnish and Installation of interior door frames
Division 9 - Finishes LS 1 $ 86,000.00 $ 86,000.00
exterior
Stucco over CMU Walls
interior
5/8" Gypsum Board Walls
Gypsum Board Walls to be painted with white primer base Daint
Caroet Base 6" hiqh Vinyl
Acoustical Ceilina, 2' x 2' Grid with water mold resistant tiles
hand dryer, soap dispenser, urinals, water fountain in the restroom entry ..
vestibule, etc..)
Bathroom and Storage area Porcelain Tile (includes water resistant wall
board)
Division 15 - Mechanical LS 1 $ 75,600.00 $ 75,600.00
Beach Shower
Greese TraD .
Air Conditioninq
. .... ....
Division 16 - Electrical LS 1 $ 65,000.00 $ 65,000.00
Restaurant Sub-Total $ 1,666,992.00
Project Total $ 5,335,712.00
.-
~
THE AMERICAN INSTITUTE OF ARCHITECTS
AlA Document A310
Bid Bond
KNOW ALL MEN BY THESE PRESENTS, THAT WE Construct Group Corp.
12101 NW 98 Avenue, Suite 8, Hialeah Gardens, FL 33018
as Principal, hereinafter called the Principal, and Hartford Casualty Insurance Company
One Hartford Plaza, Hartford, CT 06155
a corporation duly organized under the laws of the State of IN
as Surety, hereinafter called the Surety, are held and firmly bound unto City of Sunny Isles
18070 Collins Ave., Sunny Isles Beach, FL 33160
as Obligee, hereinafter called the Obligee, in the sum of Five Percent of Amount Bid
Dollars ($ 5% ),
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs,
executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for Professional Construction Services for Demolition and Construction
of Historic Sunny Isles Beach/Newport Fishinq Pier at Pier Park
NOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into a Contract with
the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or
Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt
payment of labor and materials fumished in the prosecution thereof, or in the event of the failure of the Principal to enter
such Contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference not to exceed the
penalty hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith
contract with another party to perform the Work covered by said bid, then this obligation shall be null and void, otherwise
to remain in full force and effect.
Signed and sealed this
17th
day of
August
2010
(Witness)
Construct Group Corp.
I (Prindp'Q
By:
(Seal)
(Title)
E~ ~m~
Hartford Casualty Insurance Company
I (Su "'Iy)
By ~
Attorney-in-Fact Brett Rosenhaus
(Seal)
(Title)
AlA DOCUMENT A310 . BID BOND. AlA . FEBRUARY 1970 ED. . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 N. Y. AVE., N. W., WASHINGTON, D.C. 20006
Direct Inquiries/Claims to:
PO WER OF ATTORNEY P.O. BO::1~F~;1~~~~ENUE
HARTFORD, CONNECTICUT 06115
call: 888-266-3488 or fax: 860-757 -5835
KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 21-229752
CD Hartford Fire Insurance Company, a corporation duly organized under the laws of the State of Connecticut
CD Hartford Casualty Insurance Company, a corporation duly organized under the laws of the State of Indiana
CD Hartford Accident and Indemnity Company, a corporation duly organized under the laws of the State of Connecticut
c:=J Hartford Underwriters Insurance Company, a corporation duly organized under the laws of the State of Connecticut
c:=J Twin City Fire Insurance Company, a corporation duly organized under the laws of the State of Indiana
c:=J Hartford Insurance Company of Illinois, a corporation duly organized under the laws of the State of Illinois
c:=J Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana
c:=J Hartford Insurance Company of the Southeast, a corporation duly organized under the laws of the State of Florida
having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint,
up to the amount of unlimited:
Brett Rosenhaus, Jason Katz
of
Lake Worth, FL
their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as
delineated above by 0, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the
nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and
executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law.
In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on January 22, 2004 the Companies
have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant
Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are
and will be bound by any mechanically applied signatures applied to this Power of Attorney.
.6j'.~~ ~~
l~~\ IfF:;;::~~:;-;.\ ~ ~
l"'~":_~~)_;j_. * ....~ ~ .
V..\..187'/.P ,~i\'l87~...lj-'\ 19'f'
".............' :lot~, .~
"" 'tU'Ql'\ '....,.~ ~.:.~..
fJ Ct. ~
~~
Paul A. Bergenholtz. Assistant Secretary
M. Ross Fisher, Assistant Vice President
STATE OF CONNECTICUT}
ss. Hartford
COU NlY OF HARTFO RD
On this 1st day of February, 2004, before me personally came M. Ross Fisher, to me known, who being by me duly sworn. did depose and
say: that he resides in the County of Hartford, State of Connecticut; that he is the Assistant Vice President of the Companies, the corporations
described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said
instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his
name thereto by like authority.
Scott E. Paseka
Notary Public
CERTIFICATE My Commission Expires October 31. 2012
I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct
copy of the Power of Attorney executed by said Companies. which is still in full force effective as of August 17, 2010.
Signed and sealed at the City of Hartford.
,Oc::tr? g
;:;. ; r, . .
{ptJJ~c
Gary W. Stumper, Assistant Vice President
. J. Lo\BRADOR. P .A.
CERTIFIED PUBUC ACCOUNTANTS
Suite 302
85 Grand Canal Drive
Miami. Florida 33144
TEL. (305) 262-1600
FAX (305) 262-1601
E-mail: info@labrador-cpa.com
\wNI.labrador-cpa.com
MEMBERS: AMERICAN (. FLORIDA
INSTITUTES OF CERTIFIED PUBUC
ACCOUNTANTS
NATiONAL ASSOCIATiON OF CERTIFIED
VAIIIATlON AlIAI YfiTfi
"INDEPENDENT AUDITORS' REPORT"
To the Stockholders
CONSTRUCT GROUP CORP.
We have audited the accompanying balance sheets of CONSTRUCT GROUP CORP. as of
December 31, 2009 and 2008 and the related statements of operations and retained earnings and
cash flows for the years then ended. These financial statements are the responsibility of the
Company's management. Our responsibility is to express an opinion on these financial
statements based on our audits.
We conducted our audits in accordance with auditing standards generally accepted in the United
States of America. Those standards require that we plan and perform the audit to obtain
reasonable assurance about whether the financial statements are free of material misstatements.
An audit includes examining on a test basis, evidence supporting the amounts and disclosures in
the financial statements. An audit also includes assessing the accounting principles used and
significant estimates made by management, as well as evaluating the overall financial statement
presentation. We believe that our audits provide a reasonable basis for our opinion.
In our opinion, the financial statements referred to above present fairly, in all material respects,
the financial position of CONSTRUCT GROUP CORP. as of December 31, 2009 and 2008 and
the results of its operations and cash flows for the years then ended in conformity with
accounting principles generally accepted in the United States of America.
(;, ~-);Jj
M~~1O !
Miami, Florida
2
CONSTRUCT GROUP CORP.
BALANCE SHEETS
DECEMBER 31.
ASSETS 2009 2008
CURRENT ASSETS
Cash and cash equivalents $ 39,003 S 12.469
Contracts receivable 4,177,605 4,639,679
Costs and estimated earnings in excess of bi llings
on uncompleted contracts 620, I 07 1.271.298
Total current assets 4.836,715 5,923,446
PROPERTY AND EQUIPMENT - NET 914.352 954,130
OTHER ASSETS 7,855 5.591
$ 5,758,922 $ 6,883,167
LIABILITIES AND STOCKHOLDERS' EQUITY
CURRENT LIABILITIES
Short - term borrowings
Current portion of long-term debt
Accounts payable - trade
Accrued liabilities
Billings in excess of costs and estimated earnings
on uncompleted contracts
'rotal current liabilities
$
850,000
240,767
765,995
116,333
$ 982,787
172,420
1,777,431
180,784
2.153,879
156,413
3,089,051
LONG - TERM DEBT
574,279
483,950
STOCKHOLDERS' EQUITY
Common stock - 600 shares of no par value
150 authorized, issued and outstanding
Paid-in capital in excess of par
Retained earnings
500 500
37,169 37,169
2,993,095 3.272,497
3,030,764 3,310,166
$ 5.758.922 S 6,883,167
The accompanying notes are an integral part of this statement
~
.,
I "
CONSTRUCT GROUP CORP.
STATErvlENTS OF OPERATIONS AND RETAINED EARNINGS
FOR TIlE YEARS ENDED DECEtvlBER 31,
2009 20()S
Contract revenues carned $ 11,208,994 $ 13,960,808
Cost of revenues earned 10.075.935 10,925,312
Gross profit 1,133,059 3,035,496
General and administrative expenses 1,448.073 1,563,946
Income (Loss) fi'om operations (315,014) 1,471,550
Other income and (expense)
Interest income 106,802 4.819
Other income 140,500
Interest expense (72,220) (33,893)
175,082 (29,074)
Net Income (Loss) (139,932) 1,442,476
Retained earnings at the beginning of the year 3.272,497 2,196,021
Dividend distribution (139,470) (366,000)
Retained earnil1(JS at the end of the year S 2,993,095 $ 3,272,497
o .
The accompanying notes are an integral part of this statement
4
j :' .
CONSTRUCT GROUP CORP.
STATEMENTS OF CASH FLOWS
FOR THE YEARS ENDED DECEMBER 31.
2009 2008
Cash flows from operating activities:
Net Income (Loss) $ (I 39.932) $ 1.442,476
Adjustments to reconcile net income to cash
provided by operating activities:
Depreciation 273,751 180,619
Changes in assets and liabilities:
Decrease (increase) in contracts receivable 462.074 (2,440,047)
Decrease in other receivables 344,011
Decrease (increase) in costs and estimated earnings in
excess of billings on uncompleted contracts 651,191 (983,507)
Decrease (increase) in other assets (2,264 ) 2.050
Increase (decrease) in accounts payable - trade (l,0 11,436) 1,171,177
Increase in accrued liabilities 116,333
Increase in billings in excess of costs and
estimated earnings all uncompleted contracts 24,371 17,285
Cash nows provided by (used in) operating activities 374,088 (265,936)
Cash f10ws used in investing activitics:
Purchase of property and equipment (J 27,296) (220,152)
Cash f10ws provided by (used in) financing activities:
Proceeds from (Repayment of) short - term borrowings (132,787) 979,217
Proceeds from refinance of short - term borrowings 250.000
Dividend distribution (139,470) (366,000)
Repayment of long - term debt (198,001) (143,678)
(220,258) 469,539
Net increase (decrease) in cash and cash equi valents 26.534 (16,549)
Cash and cash equivalents at the beginning of the year 12,469 29,018
Cash and cash equivalents at the end of the year $ 39.003 S 12.469
Supplementarv disclosure of cash now information
Non-monetary investing and financing transactions:
Debt incurred to acquire property and equipment
Cash paid for interest
$
$
106,677
72.220
$
$
453,907
33.893
The accompanying notes are an integral part of this statement
5
I. "
8/17/2010
CONSTRUCT GROUP CORP.
STATE CERTIFIED GENERAL CONTRACTOR
STATE LICENSE: CG-C062818
12101 NW 98TH AVE. STE # 8
HIALEAH GARDENS FL. 33018
Ph: (305) 824-8845
Fax: (305) 824-3224
To all interested parties,
Attached to Construct Group Corporation's proposal is our most recent financial
statement available showing our strength and capability to provide our services to
demolish and reconstruct Sunny Isles Fishing Pier and Restaurant. As of today, our
present financial condition is materially the same as shown on the balance sheet and
income statement submitted (Submittal #8).
-
.. ..
SWOR.t~ STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted
to G..t-ry of Sl-lV\I\.'1 Is Ie"}
by Cons -j-rtACf- G v-ovr Corp.
for 0\e. New,Por+ F/5hl.l'lj ple.r t:i./\d f2esfc.tIA/'Ct/l+
whose business address is
1Z-IO{ N. IN. qg'/j. A-v~ sf. b
f-hCt IGth GcvolVt5 fL. ,30 {g
and (if applicable) its Federal Employer Identification Number (FEIN)
G 5 - {II q q t7-
(If the entity had no FEIN, include the Social Security Number of the individual signing this
sworn statement:
tV / A
1
2. I understand that a "public entity crime" as defined in Paragraph 287. 133 (l)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287.133(l)(b), Florida
Statutes means a fmding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or
entry of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287. 133 (l)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
EXHIBIT" A"
14
.) .
5. I understand that a "person" as defined in Paragraph 287.133(l)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States with
the legal power to enter into a binding contract and which bids or applies to bid on contracts
for the provision of goods or services let by a public entity, or which otherwise transacts or
applies to transact business with a public entity. The term "person" includes those officers,
directors, executives, partners, shareholders, employees, members, and agents who are active
in management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (1) of the
y.nlowing three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the
State of Florida, Division of Administrative Hearings and the Final Order by the Hearing
Officer determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WmCH IT IS FIT-ED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD
AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE
CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS
FORM.
FIANT
bu>+<<vo J/. c'r~ ;Jf<U.... / 5' ew~~
(printed or Typ Legal Name of Affiant)
15
.. ""
State of Florida of County of Miami-Dade )
Sworn to and subscribed before me this / 7 f!:
(;U6~O
day of
Notary Seal:
e./X...
--'
EVELlO TAPANES
Notary's Name Printed, Stamped or Typed
Personally Known: / or Produced Identification
Identification Produced
A-Vlt) LA-st
,2010 by
16
... .. 'I .
.
NON-COLLUSIVE AFFIDA VIT
State of Florida )
)ss
County of Miami-Dade )
G"Jkw; IL {;"<<-"-fer~ I 5cu,-~
says that:
being first duly sworn, deposes and
(1) He/spe is the (Owner, Partner, Officer, Representative, or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circmnstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded,
conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or
person to submit a collusive or sham Bid in connection with the Work for which the
attached Bid has been submitted; or to refrain from bidding in connection with such
Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or
communication, or conference with any Bidder, firm, or person to fix the price or prices
in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements
of the Bid price or the Bid price of any other Bidder, or to secure through any collusion,
conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny
Isles Beach, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder
or any other of its agents, representatives, owners, employees or parties in interest,
including this affiant.