HomeMy WebLinkAboutMisener Marine -- .. MISENER MARINE CONSTRUCTION INC 5600 West Commerce Street / Tampa, Florida 33616-1930/ P.O. Box 13427 Zip 33681-3427 Telephone (813) 839-8441/ Fax (813) 831-7498 Factor 1 - Corporate Experience AUG 1 7 2010 ........... "<f '. CIty of Sunny 18&1 Beach Founded by Richard H. Misener in 1945, the firm was formally incorporated in_l.fj5'6.<ilR"de'r.c'erk the name of Misener & McEvoy, Inc. After Mr. McEvoy's departure in 1962, the company's name was changed to Misener Marine Construction, Inc. (Misener). Date of incorporation in the State of Florida was February 8, 1967. As of August 16, 2002, Misener is a wholly owned subsidiary of Orion Construction LP, a member of the Orion Marine Group (www.orionmarinegrOuD.com) of Houston, Texas and is a leading heavy civil marine contractor providing a broad range of turn-key solution marine construction and specialty services on, over and under the water along the Gulf Coast, the Atlantic Seaboard and the Caribbean Basin. No other company focused on heavy civil marine construction has our unique combination of experience and resources. Its marine construction services include marine transportation facility construction, dredging, bridge building, marine pipeline installation, as well as specialty services. These specialty services include pile.: driving, drilled shafts, marine towing, demolition, excavation, salvage and diving services including underwater inspection and repair. The Company is headquartered in Tampa, Florida with regional offices in Jacksonville, Florida and Norfolk, Virginia and has a legacy of more than 60 years of successful operations. Misener owns, operates and maintains a remarkably wide range of equipment including an extensive tugboat and barge fleet, pipe-lay vessels, cranes, dredging and pile driving rigs, dive support vessels, and much more. A large staff brings together the most highly skilled and experienced people in the business. The history of our work performance is unblemished and we have successfully completed every project undertaken by the firm. We continually strive to perform quality projects that exceed our customer's expectations. Misener Marine Construction, Inc. acknowledges receipt of addendums number one (1) through three (3) for this project as of the bid date of August 17, 2010. ( 1 g MISENIR MARINI CONSIRUCTION tNC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 Financial Information Annual Value of Construction Work Year 2009 2008 Value (US$) $118,233,000.00 $ 97,026,077.00 Corporate Structure Misener Marine Construction, Inc. is a 100% wholly owned subsidiary of Orion Construction, LP. Orion Construction, LP is located at 12000 Aerospace Ave., Suite 300, Houston, TX, 77034. Factor 2 - Relevant Experience For our relevant experience projects Misener Marine Construction, Inc. (Misener) has selected several similar marine construction contracts that are most representative of our extensive experience similar to the Professional Construction Services to Demolish and Reconstruct the Historic Sunny Isles Beach/Newport Fishing Pier at Pier Park project. We have worked in many capacities ranging from General Contractor, Design-Builder, Prime Contractor and Subcontractor. This wide variety of delivery system participation allows us to view the construction and renovation process from a multitude of perspectives and manage the process effectively, efficiently, and fairly. We place strategic focus on each project to ensure that the Owner's perspective is well understood and their primary goals and concerns are taken into full consideration during the construction phases. You will find several outstanding qualities that run through our organization including dedicated and experienced professionals. The combination of personal commitment and corporate operational strategy creates a business environment for success: Commitment to customer satisfaction, On-time delivery, Quality materials and installation, a safe work-site and a high standard of professional service. We believe our broad range of past experience coupled with our recent relevant experience makes Misener Marine an excellent candidate for the Professional Construction Services to Demolish and Reconstruct the Historic Sunny Isles Beach/Newport Fishing Pier at Pier Park project. We will successfully perform the project while working and partnering with your staff in order to maximize your satisfaction. 2 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 gMIIINIR MARINI CONSIRUCTION INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 In this section we have included several examples of our past projects that indicate our ability to successfully construct a similar marine project: 1) North Carolina Aquarium Pier at Nags Head, NC - Clancy & Theys Construction Co. Project consisted of construction of a 1,200 LF pier, extending into the Atlantic Ocean at Nags Head, North Carolina. The pier was constructed on 24" prestressed concrete piles, with precast pile caps 40' on center. The caps were spanned with 30" prestressed beams which had embedded timber nailers to secure the timber pier decking. The 10,000 SF three story pier house was constructed by the prime contractor after Misener Marine completed erection of the first 200 LF of the pier. The pier under the building was erected on 24" piles with precast pile caps, beams and deck panels. Pier construction was completed from multiple temporary trestles, up to 1,200 feet long, allowing for an accelerated construction schedule, with the remaining pier and pier house being constructed simultaneously. Additional work included installation of FRP grating and unistrut for the pier utilities, erection of three wind turbines, and support to the prime contractor for the construction the pier house. This was a 14 month project completed in August, 2010, with a project value of $9.9 million. 2) Venice Beach Fishing Pier - City of Venice Beach, FL Scope of work consisted of construction of a 720 LF fishing pier from the beach extending into the ocean at Venice Beach, Florida. 3) Panama City Municipal Fishing Pier, Panama City, FL - City of Panama City, FL Construction of a 1,400 LF fishing pier using structural innovations developed by our Engineering Department, from the beach to the ocean in Panama City, Florida. 4) Coastal Field Research Facility Pier, Duck, NC - U.S. Army Corps of Engineers Construction of a 1,840 LF U.S.A.C.O.E. research facility pier using a temporary steel trestle for access in Duck, North Carolina. S) Fort DeSoto Park Egmont Channel Fishing Pier - Pinellas County, FL Construction of a concrete fishing pier on the Egmont Channel side of Fort DeSoto Park, Florida. 6) Fort DeSoto Park Gulf Fishing Pier - Pinellas County, FL Construction of a 1200 LF fishing pier on the Gulf side of Fort DeSoto Park, Florida. 7) Indian Rocks Beach Fishing Pier - Pinellas County, FL Construction of a 1,040 LF fishing pier in the Gulf of Mexico, Indian Rocks Beach, Florida. 8) Redington Beach Long Pier - Pinellas County, FL Construction of a 1,021 LF pier in the Gulf of Mexico, Redington Beach, Florida. 3 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 ... MIIINIR MARINI CONSIRUCTION INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 Factor 3 - Completed/Work in Progress for Last 5 Years Prolect Name Owner Owner Contact Thomas B. Manual Bridge & Re-Decking FOOT Turnpike William Sears: 954-934-1115 Division SL 15 (Spoil Island ) Mitigation Site D/B FOOT District 4 George Dente: 954-436-1400 USF Seawall Repairs & Pier Replacement USF Board of Trustees James Grant AlA: 727-553-4820 SAD Canal Dredging, Coquina Key City of St. Petersburg Thomas Gibson: 727-892-5206 Marine Structures at Berth 219 Port Tarmac America Gary Smith: 305-364-2200 Tampa Spoil Island 3D Improvement Port Tampa Tampa Port Authority Bruce Laurion, P.E.: 813-905-5001 Tampa General Hospital Seawall Tampa General Oslec Fernandez: 813-844-7559 Reconstruction Hospital Jay Jay Railroad Bridge Emergency Repair RUSH Construction William Chivers: 321-267-8100 Royal Watler Cruise Term. Marine Work Port Authority of Clement Reid: 345-949-2055 Cayman Islands Berth 213 Improvements Tampa Port Authority Bruce Laurion, P.E.: 813-905-5001 NaviRationallmDrovements Tampa Port Authoritv Bruce Laurion P.E.: 813-905-5001 Garden City Terminal Container Berth 8 Georgia Ports Wilson Tillotson: 912-964-3914 Authoritv Marjorie Park Yacht Basin Improvements City of Tampa 813-274-5677 Ammonia Dock Construction & Seawall Kinder Morgan Steve Daniel, VP: 504-837-5278 FY 2005 NaviRationallmDrovements Tampa Port Authoritv Bruce Laurion P.E.: 813-905-5001 Hookers Pt. Earthwork/Berth 213 Tampa Port Authority Bruce Laurion, P.E.: 813-905-5001 Backland Clifton Pier Dock Repairs Island Cement Co. Frederick Murray: 242-328-2155 Esso Ander Dock Upgrade/ Pipeline Repair Esso Standard Oil Ltd. Edgar Herrero: 242-377-6509 14th Ave. North Ocean Outfall City of Myrtle Beach Ron Andrews: 843-918-2000 Grand Turk Cruise Ship Docking Facility Grand Turk Cruise Giora Israel, Sr. VP: 305-599-2600 Terminal Ltd. Amerada Hess Tampa Terminal Amerada Hess Corp. Clay Carlisle: 732-750-6000 Motiva Dock Port Tampa Motiva Enterprises David Esquibel: 713-241-8659 CB 8 Bulkhead Anchor System Installation Georgia Ports Auth. Wilson Tillotson: 912-964-3914 Tampa Bulk Pile Cap Foundation Repair Tampa Bulk Service Ron Webber: 813-837-0192 Crane Rail Beams Upgrade Georgia Port s Auth. Wilson Tillotson: 912-964-3914 Rehabilitation of North Wharf St. Lucia Air & Sea Chidi Tobias: 758-452-2893 Ports Auth. Standard Concrete Pier Construction Standard Concrete Larry Paul: 813-831-9520 3'd Street Bridge over Booker Creek City of St. Petersburg Fred Dargahi, P.E.: 727-892-5379 Berth 3 Bulkhead Improvements Tampa Port Authority Bruce Laurian, P.E.: 813-905-5001 Container Berth 5&6 Fender Replacement Georgia Ports Auth. Wilson Tillotson: 912-964-3914 St. PeterSburg Yacht Club Marina Repairs St. Pete Yacht Club Fred Bickly: 727-804-3550 Yara Dock Modifications Kinder Morgan 5teve Daniel, VP: 504-837-5278 Deep Head Swash Ocean Outfall Phase II City of Myrtle Beach Ron Andrews: 843-918-2000 Export Dock Extension & Modifications Kinder MorRan Steve Daniel, VP: 504-837-5278 Twin Dolphin Marina Renovations Twin Dolphin Enter. Hugh Miller: 941-748-3433 ESSO Clifton Term. Access Pier Repairs ESSO Standard Oil Co. Art Hernandez: 787-792-2920 Berth 10 Collision Repair Manatee County Port George Isiminger: 941-722-6621 Authority 4 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 .... MIIINIR MARINI CONStRUCTION INC Proiect Name Owner Owner Contact Rousea Berth Improvements Dominica Port Auth. Benoit Bardouille: 767-448-4431 Sparkman Channel Dredge Widening Tampa Port Authority Bruce Laurion, P.E.: 813-905-5001 Ocean Club Marina Construction Bahamas Marine Jimmy Mosko: 242-362-5219 Construction Co. Berth 4 & 5 Dredging Port Manatee Manatee Port Auth. George Isiminger: 941-722-6621 Hilton Key West Marina South Basin Develop. Julie Jacques: 603-559-2100 Tampa Port Repairs & Improvements Tampa Port Auth. Bruce laurion, P.E.: 813-905-5001 Ambergris Cay Airport Runway Extension Ambergris Cay Barry Loudermilk: 704-790-3159 Partnership Marine Terminal Facility Repairs CITGO Joe Johnson: 912-966-6605 Berth 26 Improvements Tampa Port Authority Bruce Laurion P.E.: 813-905-5001 South Cargo Pier 2 - Phase II Canaveral Port Auth Jon Brazee: 321-783-7831 Wilmington Terminal Dock Upgrade CEMEX, Inc. Mike Sprott: 713-722-2938 Rehab 5ykes Creek Bridge (#T5167) FOOT Central Office Kim Navarro: 321-634-6563 Boat Landing Improvement Limehouse Charleston County Jon Guerry Taylor: 843-884-6415 Park & Recreation Outfall Structure Repair US Mechanical Contr. Stephen Abercomb: 912-966- 5471 Wharf Reconstruction Atlantic Wood Ind. Ross Worsham: 912-966-7029 Liberty Terminals Wharf Repair Liberty Terminals Gary Greene: 912-855-8488 The Shipyards Bulkhead Imorovement land mar Group LLC Robert Furlong: 904-791-3047 Shipyards/Public North Bank Develop. Robert Furlong: 904-791-3047 Rehabilitation Queen's Harbor Gates Queen's Harbor Yacht David Cawton: 904-221-0541 Spray Miser Bulkhead Spray Miser I'ntl George Lorton: 813-391-6683 Clifton Pier Breasting Dolphin Chevron Texaco Sheryl Tyler: 786-552-6000 Cruise Terminal Mooring Bollard Jacksonville Port Auth Joyce Goodwin: 904-630-3062 Belleair Beach Causeway Replacement Pinellas County BOCC Tony Horrnik: 727-464-3640 Valrico WWTP Pile Driving Hillsborough County John Aberle: 813-272-5790 Renovation to Hookers Point Berths Marine Construction Joe Cimino: 813-831-1211 Intake Canal Sheet Pile Crane Platform Florida Power & Light Thad Greer: 727-467-7000 Repair US Navy Marine Ops Facilities Sauer Inc. Fred Tarverdi: 904-262-6444 Sea Berth Hurricane Repairs ESSO Standard Oil Co. Edgar Herrera: 305-459-6358 Vinoy Marine Rehab WSRH VSP, LP Thomas Werner: 415-458-2320 Install 58 H-Piles US Mechanical Steve Abercomb: 912-966-5471 Submarine Pipeline Upgrade E5S0 Standard Oil Co. Edgar Herrera: 305-459-6358 Tug Boat Dock Terminal Services LLC Walter Arnold: 904-285-8051 St. Pete Pier 5 City of St. Petersburg Thomas Gibson: 727-893-7827 Cement Import Terminal Sumter Cement Co. James Leonard: 904-361-7714 Replace Breasting Dolphins Rattlesnake pt Cargill Sweetners Stephen Walton: 813-386-1980 Repair Dock NuStar Logistics LP Terry Ennis: 912-236-1579 Rip Rap & Piling Rehab Blackburn Point Sarasota County Richard Mullins: 941-861-0758 North Bank Riverwalk Repairs to Bridge City of Jacksonville 904-630-1175 Matanzas River Bridge Cathodic Protection Intron Technologies Jody Windsor: 904-731-1445 Colonial Terminal Pipe Bridges Kerby Enterprises Daniel Taylor: 912-660-1326 Crown Bay Cruise Terminal Dredging Virgin Island Port Auth Darlan Bin: 340-774-1629 NASA KSC Lightning Towers lvey's Construction Rocky Johnson: 321-453-3812 ! 5 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MISINER MARINI CONSIRUmON INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 Proiect Name Owner Owner Contact Sebastian River Bridge Replace (#T5208) FOOT District 5 Hector Matos: 321-690-3250 Naval Research Lab Facility Repair Freeland Construction Jack Portenier: 843-722-1740 79th St. Ocean Outfall U.S. A.CO.E. Broderick Jackson: 757-225-4053 Extension Berth 213 Tampa Port Authority Bruce Laurion P.E.: 813-905-5001 Fender Replacement NuStar Logistics Sandra Lloyd: 904-355-9675 Bridge Rehab Gandy/Howard Frankland FDOT District 7 Marc Knapp: 813-615-4577 Coffer Cell Installation/Removal TIC Southeast Division Michael Torri: 727-563-7742 Satellite Alert Facility Rush-Peak Two Cy Simons: 321-267-9944 SR 46 Bridge over Lake Jesup D/B (E5K99) FDOT District 5 Todd Long: 386-943-5558 Three Bridges Construction Indian River County Deward Howard: 772-226-1567 Repair Bulkhead Berths 6 & 7 Manatee Port Auth George Isiminger: 941-722-6621 Third Turtle Club Beach Improvement Oceanpoint Develop. Ashley Foxton: 649-941-8860 Bartow Power Plant Maintenance Progress Energy Luis Gonzales: 727-827-6104 WICO Bulkhead Replacement The West Indian Co. Edward Thomas: 340-774-1780 Florida Inland Navigational District Florida Inland Nav. David Roach: 561-627-3386 Floating Concrete Boat Slip Facility D/B City of Clearwater George McKibben: 727-562-4634 Dolphin 1#2 Replacement Florida Rock Industries James Kirkland: 813-924-2434 Facilities Repairs Jacksonville Port Auth Frank Jones: 904-357-3013 Clearwater Bayfront Promenade City of Clearwater Ed Chesney: 727-562-4742 US 19 Bridl<e over Cross FL Barge Canal Cone & Graham Bob Graham: 813-623-2856 Concrete Demolition Power Comm Eng. Mike Leahy: 813-404-1555 Labadee Cruise Pier Improvements Royal Caribbean John Weis: 305-539-6099 Road Town Cruise Pier Expansion British Virgin Island Ray Cox: 571-294-6168 Port Authority Morgan Creek Marina Bulkhead Replace City of Isle of Palms SC Unda Tucker: 843-886-6428 SR 401 Emergency Bulkhead Repair FOOT District 5 Ron Meade: 386-630-5413 McKay Bay Crossing Power Pole Replace Tampa Electric Auth Chuck Black: 813-630-5413 2008-2001 Unit Price Marine Repairs Tampa Port Authority Bruce Laurion: 813-905-5001 Berths 300 & 301 Wharf/Dolphins Tampa Port Authority Bruce Laurion: 813-905-5001 SR AlA Bridge over Bakers Haulover FOOT District 6 Mark Croft: 850-414-4000 Fender System Replacement (#T6175) Port Canaveral CT-8 Berth Improvements Canaveral Port Auth Jon Brazee: 321-783-7831 TPA Berth 26 Pile Wrap Encapsulation Wheel blast, Inc. 321-783-1063 USCG Small Boat Moorings TJC Engineering Timothy Culp: 502-228-0910 Coastline Dr. Pile Jacket Encapsulations City of Jacksonville George McDonnell: 904-255-8780 Gilmerton Bridge Fender System Repairs City of Chesapeake Ted Gardy: 757-382-3480 Dredging at Berth 240 Tampa Ship LLC Jack Edwards: 813-248-9310 Puerto Caucedo Breakwater Berth Caucedo Investments Jack Knight: 829-341-6006 NC Aquarium Pier at Nag's Head Clancy & Theys David Michael: 910-392-5220 Mavport Naval Station Wharf Alpha Impro US Naval Fac Eng Com Dianne Haymans: 904-542-6246 West Yard Pier Construction Colonna's Shipyard Inc Mark Essert: 757-545-2414 Ballast Pt Park Boat Ramp Improvements City of Tampa 813-274-8456 Port Canaveral liquid Prod Piping Support Seaport Canaveral Stan Wielga: 321-783-4890 Dona & Roberts Bay Bridge Replacement Sarasota County Jeffrey Weber: 941-650-2709 SR AlA Bridge over Matanzas River FDOT District 2 Jeffrey Williams: (#T2283) ! 6 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MISINIR MARINE CONStRUCTION INC Proiect Name Owner Owner Contact Replacement of SC802 Bridge over United Contractors James Tripplett: 803-581-6000 Beau fort River Bay Dr. & River Dr. Bridges Replacement City of Vero Beach Bill Messersmith: 772-978-4870 Port of Miami Area 3 (Seaboard) Bulkhead Central Fla. Equip Rent Marcus Thermes: 305-888-3344 REK Pier Phase 1 Improvements Tampa Port Authority Bruce Laurion: 813-905-5001 Offshore Loading Facility Rehab Morton Bahamas Ltd. Michael Nixon: 242-339-1300 SR 951 (Jolley) Bridge over Big Marco Pass FOOT District 1 Steve Strohm: 813-685-5101 (IIE1H24) Crown Bay Cruise Terminal Bollard Install Virgin Island Port Auth Dale Gregory: 340-774-1629 Tampa Channel Dist Stormwater Improve Kimmins Contracting 813-579-1099 Boot Key Bridge Bascule Span Removal FOOT District 6 Luis Amigo: 850-414-4590 (T6218) Kennedy Space Center Bridges Scour Prot NASA - KSC Allan Jones: 321-867-3463 SR AlA Bridge over Thompson Creek FOOT District 6 Kenneth Robertson: 305-470- Substructure Repairs (IIE6F50) 5404 US-1 Tom's Harbor Bridge Substructure FOOT District 6 Kenneth Robertson: 305-470- Reoairs (IIE6F451 5404 4 Seasons Resort Nevis Waterfront Improv Wells Fargo Bank, NA Tom Delaney: 619-997-3452 SR-520 Bridge over Indian River FDOT District 5 Vickie Wyche: 386-943-5525 Substructure Repairs (IIE5N37A) SR-5/US-1 Spanish Harbor over Big Pine FOOT District 6 Kenneth Robertson: 305-470- Key (IIE6F46) 5404 Port Sutton Term Dock/Crane Replace Kinder Morgan Dynell Jones: 504-620-4699 Statoil South Riding Point Terminal Sea Statoil South Riding Stafford Forbes: 242-353-4471 x Berth Pile Jackets Point Holding Ltd. 209 Bridgeway Acres Landfill Embankment Pinellas County BOCC Dot Milton: 727-646-3311 Stabilization Sheet Piles ! 7 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MillNER MARINI CONStRUCTION INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 Factor 4 - Proof of Authorization to Transact Business in Florida State of Florida Department of State I certify from the records of this office that MISENER MARINE CONSTRUCTION, INC. is a corporation organized under the laws of the State of Florida. filed on February 8, 1967. The docwnent nwnber of this corporation is 313573. I further certify that said corporation has paid all fees due this office through December 31,2010, that its most recent annual report was filed on February 8, 2010, and its starns is active. I further certify that said corporation has not filed Articles of Dissolution. Gil'III IIl1dtr nll'l,nnd nlltl tIlt Gf,nt S,nl of florida, at Tnllnllaul'f', tllll Capital, tllis tl,ll l1g't'4~ Secretary of State Aut!lemiatioll ID: 8001158213.128-420810-313513 To lL"1Wtica~1bis cm:ficcuisitae!ol~ sie. eat!rtl:i5 ID. ZDd the~ foJow tI:e ilnaucti0n5 Ciipla}'e:l. https:llrfilr.sunbiz.org/rertauthnr.html 8 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 ... MISENIR MARINI CONStRUCTION INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 Factor 5 - Proposed Project Personnel Information Proposed Project Manager: John Kipp Title: Project Manager Contact Information: 900 Port Blvd., Miami, FL, 33132 813-317-6609 Qualifications/Experience: Port of Miami - Area 3 Seaboard Terminal Bulkhead, Miami, FL (2oo9-Present) Working as subcontractor to Central Florida Equipment on the removal, demolition and disposal of existing monopile breasting dolphins and bulkhead sections. Modification to existing bulkheads to allow connection to new sheetpiles. Install steel pile bulkhead main wall and anchor wall; bulkhead concrete encapsulation, excavation, dredging and placement of backfilled material. Approximate value: $2.5 million. FOOT District 6 - Baker's' Haulover Bridge Fender System Replacement, Miami, FL (2009) Remove existing prestressed concrete pile and timber fender system. Install 202 each new 14" x 89# steel H-piles with reinforced plastic walers with plastic lumber decking. Replace navigation light system, platforms and access ladders. The new fender system is 224 LF long on each side with 7 wales vertically. Approximate value: $2.9 Million US Navy - Research Lab Facility Repair, NAS Key West, FL (2007-2008) Worked as a subcontractor to Freeland Construction on this NAVFAC project to drive a new 438 linear foot PZ 40 sheet pile wall out in front of the existing wall. Demolish existing concrete wall cap and place a new concrete wall cap. Cast a new concrete curb. Place concrete fill between the existing wall and the new wall. Encapsulate the front side on the new wall with 8" of concrete from the top to two feet below the existing sea bottom. Install new stainless steel cleats and two new stainless steel safety ladders with life ring stands. Approximate value: $1.9 million. US Navy - Repair Marine Ops Facility, NAS Key West, FL (2008-2009) Worked as subcontractor to Sauer, Inc. on this NAVFAC project to demolish piers 8-796, 8-797 & 8-798 and replace/repair mooring hardware on pier 0-1. Reconstruct pier 8-796. Repair undermining of pier 0-1. Repair spalls on the face of pier 0-1. Remove and replace concrete curb along pier 0-1. Install 125 each rubber arch fenders face or pier 0-1; remove sunken barge and Install new plastic fender system pier 8-796. Approximate value: $7.1 million. Cargill Sweeteners - Breasting Dolphin Structure, Tampa, FL (2007) Fabricate a dolphin frame with four lS" sleeves, drive four 16" diameter piles through the sleeves, connect frame to the piles, install 30' rebar cages inside the piles, fill piles with concrete, grout annulus between the piles an sleeves, install timber fender, weld bit pipe in place and touch up paint. Approximate Value: $160K Citgo - Marine Structure Demolition, Tampa, FL (2007) -Removal/Disposal of 4 out of service dolphins. Approximate value: $126K 9 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MIIINIR MARINI CONStRUCTION INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 Proposed Construction Manager: Chuck Gillette Title: Construction Manager Contact Information: 900 Port Blvd., Miami, FL, 33132 813-317-6609 Qualifications/Experience: Port of Miami Area 3 (Seaboard Terminal) Bulkhead, Miami, FL (10/2009 - Present) Removal, demolition and disposal of existing monopile breasting dolphins and bulkhead sections. Modification to existing bulkheads to allow connection to new sheet piles. Install steel pile bulkhead main wall and anchor wall; bulkhead concrete encapsulation, excavation, dredging and placement of backfilled material. Approximate value: $2.5 million. FOOT SR AlA Bridge/Bakers Haulover Inlet Fender System Miami, FL (02/2009 -12/2009) Construction Manager responsible for removal of existing prestressed concrete pile and timber fender system. Install 202 each new 14" x 89# steel H-piles with reinforced plastic walers with plastic lumber decking. Replace navigation light system, platforms and access ladders. The new fender system is 224 LF long on each side with 7 wales vertically. Approximate value: $3 million. NAS Key West Trumbo Point - Marine Operations Facility, Key West, FL (2007 - 2009) Subcontractor to Sauer Inc., on this Navy Project as Construction Manager for the demolition of three finger piers 250'x25', construction of one finger pier 250'x28'. Selective demolition & concrete encapsulation of 1200' quay wall. Approximate Value: $7.5 million. NAS Key West Trumbo Point - Naval Research Lab, Key West, FL (2007 - 2008) Subcontractor to Freeland Construction on this Navy Project as Construction Manager to construct 425' bulkhead wall with PZ 40 sheet pile and concrete encapsulation. Approximate value: $2.5 million. FOOT - Rehab Sykes Creek Bridge, Cape Canaveral, FL (2006-2007) Bridge repair/ rehab SR529 over Sykes Creek, construction of crutch bents for two existing bridges. Approximate value: $1.3 million. City of Myrtle Beach - 14th Avenue North Ocean Outfall, Myrtle Beach, SC (2005-2006) Construction Manager responsible for the installation of approximately 1,200 If of parallel 84" concrete drainage lines out into the Atlantic Ocean. Approximate value: $5.5 million. City of Myrtle Beach-Oeephead Swash Ocean Outfall Phase II, Myrtle Beach, SC (2005 - 2006) Construction Manager responsible for the installation of two (2) approximately 1,000 If each 60" diameter reinforced concrete pipes by direct burial method to an ocean outfall at amount -22 ft. NGVD, placement of rock filter and armor stone at the outlet nozzles of the pipe and testing and cleanup following completion of pipe and stone installation. Approximate value: $5 million. 10 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MISINIR MARINI CONStRUCTION INC Factor 6 - Project Coordination Procedures Misener Marine, through years of experience in the industry is use to conducting our work in and around environmentally sensitivity areas. We are also very experienced in working in aggressive weather environments such as the open ocean and the challenges it can bring. We realize the importance of achieving the completion dates given within the documents and are prepared to allocate all resources necessary to expedite this project. One of the methods we are proposing to use will not only help minimize the impacts to the environment but help minimize the delays to the completion date that could be caused by rough seas/weather while working on the water. Even though this method is a faster and safer way of completing this work, the weather will still be monitored daily and evaluated taking safety measures into account. Demolition of Existing Structure Extreme care will be taken while installing and removing a temporary work trestle alongside the existing pier to help facilitate the removal of the existing structure. This will not only minimize the impacts to the environment that could be caused by the floating equipments anchoring system but also help minimize weather delays that may be caused from rough seas. The existing pier will be removed in its entirety starting from the landside and working our way out while working off of the temporary trestle. The materials removed will be evaluated and disposed of in the proper landfills. Any debris that may fall into the water during the removal will be retrieved and disposed of so as to not cause a hazard to the environment, boaters and swimmers or beach public. The debris will either be hauled off site using trucks or material barges. Our material barges if used either for hauling or transporting materials to the site will not be anchored to the oceans floor. Constructing of the New Pier With the aggressive schedule and date of completion given, the contractor understands the need for multiple crews working in multiple locations in order to achieve these dates. Waterside: The new pier will be constructed starting from the landside going out while working from the temporary trestle. We will have a crew installing the pile while a second crew follows behind constructing the caps, deck and hand railing. Once the pier is completed waterside, we will remove the temporary trestle in its entirety and demobilize it from site. While the trestle is being removed the electrical and finishing touches will be completed on the pier. landside: While constructing the waterside pier we will have a third crew on land installing the pile and foundations for the new restaurant building. Once the foundations are complete, our local building subcontractor will start erecting the building and all components required in the plans and documents. Identified items to consider: As for a lay down area, access routes for materials and the removal of the existing structure, we are open and willing to work with the owner in determining the most cost effective measure. We have the option of bringing some of the materials in by barge or by land whichever is more beneficial to the owner. We will need to keep in mind that if all materials have to be brought in by water/barge due to lack of land access, weather could play into the completion date. 11 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MlalNIR MARINI CONStRUCTION INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 frQject Implementation Schedule o ~ i ~ ~ II ifU fr" Ii o I f !i i n ~ f II ~ . l i I f - ~ if ~ifr i'iii L__ ~n~ x...__ i ~ ~ I I, I I I I II t I i'ilil! ;1~lil~!-I..~.~ Iii -1;'~I~iil'iil~I~.~..'~. I..~I~ e jl- - - - ~,~ ~ ~ - _I !l,~ iJ 11-, ~kU I ~I~ i I ! ~If ili ilii~ 1 ~ & i ~ il[I~li ~ i.~I!'~ I it B ! III 'ilil,U i!1 I! II Eli i~II:II~1 II t i'1i I I I'l II llf II ~ ~ m Jm ",i01l!ll!lIl!l'l!llc m'll! t;;1i:! o:,~IIl!';;;U~ltJl oltllc 8 f~ ~ ~ m m mlo:101 l!l'l!lll!l'l!llc mill! t;; i:! o:i~IIll';;;I~!~illl oltl 0 8 ff 0000 JJo o:Jo 0 0101010 0 0 010 OLO~O 0,0'01.' .. ~I; ~.~ ~Ii i'- -Ili~ ~i.~I-I~ ~1~1~!~-~~~ ~i~-'--- ~ ~,~I~ ~ ~ ~ ~ ~ ~I~ ~:~ ~I~ ~ ~I~,JI~ ~ ~ ~ ~ U ! IS ~I~I~I~ il~ ~I~ !'!I~I~iJlili !'il~I;lii~i~ i ~ ~ ~~ - - - - - - -1- - - - -1- -1- - - -'- - 010 -I 0 o,~ ~~ LI ~8 ~~ ., i '~~ It I ~r 1('( ~n , t i Iii 1(1' ~ I I ~! fi' Ii I II 'III j I : ! i " , r I I l !Hh.J r~! ! fiB ;1 ~!U i I r 11.0 ~ rllll~ I ill! 11:1 j 1 i I ~ to ~ [ ~l I I ;r pr 12 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MISINIR MARINI CONStRUCTION INC Factor 7 - Detailed Financial Cost Breakdown Our price reflects duration of 212 calendar days to remove and construct the new pier along with the new restaurant shell all in accordance with the plans and specifications issued for the bid but does not include the duration for pulling the permits. 08/17/2010 8:44 #0904077 Sunny Isles Beach Fishing Pier ... mn TOTAL" Bidltem neoc:r1otlon Status - Rnd .QImn!l!y !l!!i!! !Lni!h!n ..Hi1I.I2!!l I MobilizationlDemobilization 1.000 LS 903,124.01 903,124.01 TolJIl MobilizationlDemobilization $903,124.01 5 Removal of Existing Structure 1.000 LS 340,999.66 340,999.66 7 Class 5 Finish 53,600.000 SF 2.11 II 3,096.00 10 Concrete Class IV (Substructure) 133.800 CY 1,069.07 143,041.57 15 Reinforcing Steel (Substructure) 21,537.000 LB 0.85 18.306.45 20 Prestressed Beams (Florida Double T ees.FOOT 18) 1.408.000 LF 358.99 505,457.92 25 Protection of Existing Structures 1.000 LS 21,053.69 21,053.69 30 Prestressed Concrete Piling (24" Sq.) 4,723.000 LF 102.2] 482,737.83 35 Load Test - Dynamic 9.000 EA 3,179.47 28,615.23 40 Test Piles (24" Sq.) 9] 2.000 LF 166.42 15].775.04 45 Em bedded Data Collector 9.000 EA 1,922.34 17,301.06 50 Bridge Deck Expansion Joint 256.000 LF 228.06 58,383.36 55 Pipe Handrail - Guiderail (pVC) 1,310.000 LF 128.52 168,361.20 60 Electrical On Pier I 1.000 LS 91,232.64 91,23264 Pier T olal $2, I 40,361.65 65 Test Piles at Restaurantl96 ]96.000 LF 156.9] 30,754.36 70 Piles at Restaurant 3,800.000 LF 114.33 434,454.00 75 Substructure Concrete 1.000 LS 149,734.79 ]49,734.79 80 Deck Concrete I 1.000 LS ]36,623.00 ]36,623.00 85 Approach Slab 1.000 LS 18,083.08 18,083.08 90 Stairs and Landing I 1.000 LS 21,509.00 21,509.00 95 Building Shell 6,212.000 SF 101.68 631,636.16 135 Plwnbingl 1.000 LS 280,715.82 280,7] 5.82 140 Mechanciall 1.000 LS 2]0,536.87 2 10,536. 87 145 Electrical 1.000 LS 350,894.78 350,894.78 Restaurant Total $2,264,941.86 Bid Total $5,308,427.52 13 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 MISENER MARINI CONStRUmON INC Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park RFP #10-07-02 Factor 8 - Certified Financial Statement ORION MARINE GROUP, INC. AND SUBSIDIARIES CONSOLIDATED STATEMENTS OF INCOME (In thousands, except share and per share amounts) Contract revenues Costs of contract revenues Gross profit Selling, general and administrative expenses ~ $ 293,494 lli:l!l1 62,697 lQ.ill 31,750 Year ended December 31, ~ $ 261,802 lli.lli 50,451 ll.lli 22,473 2007 $ 210,360 159 927 50,433 ~ 27,487 Interest (income) expense Interest (income) Interest expense Interest (income) expense, net Income before income taxes Income tax expense Net income (352) (530) (1,000) ~ 1.246 -----2lQ -----11l2 -----BQ (90) 31,564 21,757 27,577 ----il.lli ~ 10.178 ~ ~ $ 17399 $20,030 $ 14,475 $ 17.399 - ------1Jg ~ ~ $ 16617 $ 0.85 $ 0.67 $ 0.85 $ 0.84 $ 0.66 $ 0.83 23,577,854 21,561,201 19,657,436 23,979,943 21,979,535 19,976,683 Net income Preferred dividends Earnings available to common stockholders Earnings per share available to common stockholders: Basic Diluted Shares used to compute earnings per share Basic Diluted The accompanying noles are an imegral pari oflhese consolidaledfinancial slalemems F-5 14 Demolition/Reconstruction Sunny Isles Beach/Newport Fishing Pier at Pier Park, RFP #10-07-02 d SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to Ci ty of Sunny Isles by James L. Rose, President fur Misener Marine Construction, Inc. whose business address is 5600 W. Commerce St. Tampa, FL 33616 and (if applicable) its Federal Employer Identification Number (FEIN) 59-1158596 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. I understand that "convicted" or "conviction" as defined in Paragraph 287.1 33 (l)(b), Florida Statutes means a fmding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4. I understand that an "affiliate" as defined in Paragraph 287.133(l)(a), Florida Statutes. means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity come. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. EXHIBIT" A" 14 5. I understand that a "person" as defined in Paragraph 287. 133 (l)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (Please indicate which one (1) of the following three (3) statements is applicable.) ~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. _(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FO L'~ SIGNATURE OF AFFIANT James L. Rose, President (printed or Typed Legal Name of Affiant) 15 .. ~ . State of Florida of County of Miami-Dade ) Sworn to and subscribed before me this J;;" +h day of flu 3 a';,.!-- L . (~c; J d~{/L{- ,2010 by Notary Seal: NOTARY PUBliC-STATE OF FLORIDA ,''''', La' A S' ---:\n.j "'.. une. lmpson ~ W~ iCo~mission #DD815549 """"...... ExpIres: NOY. 07, 2012 BONDXIJ TIUIU ATLMfnc BONlJmG co., me. Notary's Name Printed, Stamped or Typed Personally Known: /' or Produced Identification Identification Produced 0/N 16 ... NON-COLLUSIVE AFFIDA VIT State of Florida ) )ss County of Miami-Dade ) James L. Rose, President says that: being first duly sworn, deposes and (1) He/she is the (Owner, Partner, Officer, Representative, or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, finn, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, finn, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, or any person interested in the proposed Work; (5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents, representatives, owners, employees or parties in interest, including this affiant. EXHIBIT "B" 1'7 -'" FURTHER, AFFIANT SAYETH NAUGHT. Misener Marine Construction, rnc{vendor) By: James L. Rose, President a~u-- / President/Owner A Sworn to and subscribed before me this ,:)~ day of (Juj U-~~ by -::;art1..LS G. ~ ~wner) of . /' /\ _r.L" hot<- tne. /vl, $€,JU.f t){jYI h-e LUl.;)1 r uC!' Who is personally known to me or has produced a AJh4- / , 2010, as identification. /.~;jv~) ~ Notary Public My Commission Expires: /{I07Ij~ DD<Z1554t1 N~.r.~Y PVBUC~TATE OF FLORIDA (bi.''.:. Laune A. Simpson ;,.~)Co~mission #DD815549 ."........ Expires: Nay. 07, 2012 BONDED TIlRU ATLANnc BONDING CO., me. My Commission No.: 18 ~ ;~ Liberty, ~ Mutual. Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA, 19462-1644 Ph. (610) 832-8240 BID BOND Bond Number: N/A KNOW ALL MEN BY THESE PRESENTS, that we Misener Marine Construction, Inc. , as principal (the "Principal"), and LIBERTY MUTUAL INSURANCE COMPANY, a Massachusetts stock insurance company, as surety (the "Surety"), are held and firmly bound unto City of Sunny Isles Beach , as obligee (the "Obligee"), in the penal sum of Five Percent of Greatest Amount Bid------------------------------------- Dollars ($5% GAB), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid for: RFP #10-07-02 Professional Construction Services for the Demolition and Construction of the Historic Sunny Isles Beach/Newport Fishing Pier at Pier Park NOW, THEREFORE, if the Obligee shall accept the bid of the Principal within the period specified therein, or, if no period be specified, within sixty (60) days after opening, and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid, and give such bond or bonds as may be specified in the bidding or contract documents, or in the event of the failure of the Principal to enter into such contract and give such bond or bonds, if the Principal shall pay to the Obligee the difference in money not to exceed the penal sum hereof between the amount specified in said bid and such larger amount for which the Obligee may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void; otherwise to remain in full force and effect. In no event shall the liability hereunder exceed the penal sum hereof. PROVIDED AND SUBJECT TO THE CONDITION PRECEDENT, that any claim by Obligee under this bond must be submitted in writing by registered mail, to the attention of the Surety Law Department at the address above, within 120 days of the date of this bond. Any suit under this bond must be instituted before the expiration of one (1) year from the date of this bond. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit shall apply. DATED as of this 17th day of August, 2010. WITNESS / ATTEST: Misener Marine Construction, Inc. (Principal) B~.? /~ N .:An1.eS L. e..S<- Itle: p~: de-4 LIBERTY MUTUAL INSURANCE COMPANY (Surety) By ~~~ -Mar . Boots, t orney-in-Fact __(Seal) (Seal) LMIC-5000 Rev. 3/04 2889786 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. ,This Potier of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Insurance Company (the "Company"), a Massachusetts stock insurance company, pursuant to and by authority of the By-lC\w and Authorizatiollhereinafter set forth, does herebynCirne,Gonstitute and appoint MARC W. BOOTS, VICKIE LACY, P,T.OSBURN,RICHAROCOVINGTON, MARIAO>ZUNIGA, JOY DURHAM, HEATHER NOLES, STEPH~NIE GUN[)ERSON;ISRISTINH~~ER, ALLOF THa;CITYuOFHpUSTON, STATE OF TEXAS ....................................... ~'~',.-~''-~'~ ~.......... .'~;. ~.~-~ ~.'........ ~'. ~ ~~-~.~.~ .-~........... .':.; ;,-~'io",;:~~'~....... ~; .;,'~ ~.~ ~....... ~'-.:.;.~~.............;. '.;~'. Ii ~;.; ~..................................... , each individually if there be m6rethan one~~med, its trU~and lawful atto~n~ycin-facttbiriake, ex~t~te, seal, ackn6wl~dge and deliver, for and on its behalf as surety and as its act aiidd. €led, ari.v.....a.nd all und.e... it.. a... kinas, bonds, re... c..o. gnizance. sand other surety ObligationS... in.... the penal sum not exceeding ONE HUNDRED MILLION ANDOO/100,{********************~**************'...DOLLAftS ($ 100.000.000.00********************* ) each, and the execution of such undertakings, bonds, recognizancesc3.nd()ther surety o~ligations,iripu.rsuanceof.these presents; shall be as binding upon the Company as if they had been duly si9l1edbythe president and Cittested byttie l:;ecretar-y of the CompanY in their own proper persons. That this power is made and execute~~ur~~~nt to and by ~~t~6ritYOftti~f()iI6~ing BY-la~Md Autti~rii~ti611:u ~ 'iij o a. Ol '0. ~1II I:Ol caS .01: ~f! .- ca 'O:J ~Cl (,)Ol -:J 0- ...ca Ol> =- Olca _:J ~'O 1:'- calli O~ -... a)" 0 -Ol 0_ I:ca ~... Ol_ Cllll caOl Cl'" t::S 0.5 I: ~ ...S oca -... '0>- :(,) cal: >Ol -... 0'" z~ ARTICLE XIII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal; acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. LIBERTY MUTUAL INSURANCE COMPANY :>. ca '0 1II 1II Ol I: 'iij :J .0 >- I: ca -I: -0 rJl- >-00 OlW EI: ,go.. , -0 <C") - .. o-=t ...'0 Oll: :=ca 01: c.ca .~o J:O - .. _0) 01: >-Ol :!::Ol :E! -Ol ~.o OlO J:-=t' _C'II I:~ ...C'II '-C") -co 1:, 00 (,),.. 0<0 I-~ By the following instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys-in-fact: Pursuant to Article XIII, Section 5 of the By-Laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Insurance Company, is hereby authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. That the By-law and the Authorization set forth above are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 6th day of Mav 2010 COMMONWEALTH OF PENNSYLVANIA COUNTY OF MONTGOMERY ss ByC4 //./- a?'~ Garnet W. Elliott, Assistant Secretary On this ..21b- day of May , 2Q1Q.. , before me, a Notary Public, personally came Garnet W. Elliott. to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Insurance Company thereto with the authority and at the direction of said corporation. ~~s~~;~~~r~tt::H ~o:w. ~~ untosu~~~ribed mynClrn~~r1d~ffi~El~ my notar~ClI;~al at \1y-~?ut~~~~ti?~.pennSYIVania, on the day and year ! ~~,~(~ ~COM:.~:'Z~~~=:~::~VAMA'u .J. !i5..............,u IIi" I p,ymoUtll~..M""tgom",yCc""r;. ..... ...........By ~ ~ MyComm,<s<oo Exp"os March 28, 201.. .......--.T l .p ...t II N t P.b.I'. .......u...... ertlsaase a, 0 ary U IC Member, .~~js.~kiar,:<l As.sociation or Notadett ._:" : ". CERTIFICATE I, the undersigned, Assistan ecretar}i<>fLil:>erty Mutuall~surance Compa~y:d~ hereby certify thanh~OriginaI POW~~()f attorney of which the foregoing is a full, true and correct copy, is in fuUforce and effect on the date of this certificate; andldo furthercertifYJhattheU6fficer or official who executed the said power of attorney is an AssistantSecretary specially auttioi'iiedbythe chairman or the presidenfto appoirit attorneys-in-fact as provided in Article XIII, Section 5 of the By-laws of Liberty Mutual Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Liberty Mutual Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed. IN TESTIMONY WHEREOF;..I have hereunto subscribed my name and affixed the corporate seal of the said company, this 17th August , LOla . day of