Addendum No.4
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01 - Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
5. Q: There is a discrepancy with the RFQ No. in the Professional Engineering Services
proposal for the City of Sunny Isles Beach. On the front, it mentions RFQ No. 10-04-01,
however, inside on the page that mentions 1.1 Introduction, 1.2 Time and Date of
Submittal, etc., there is another RFQ No. This time, RFQ No. 07-07-01. Which RFQ
No. do we use as correct?
A: The correct number is the first one, the 10-04-01.
6. Q: Is SF 330 substituting SF 254 and SF 255? Or one can submit either the 330 or
254/255?
A: Either way, the 330 or the 254/255.
7. Q: Item 2 (list of projects for the past 5 years) can be covered through forms SF 330 and
254/255: is it going to be considered separately anyways?
A: Please list the relevant projects in the ten pages (though they are not required to
be in the same format as the 330/254/255).
8. Q: According to Addendum 3, proof of authorization to transact business in Florida &
the financials will count towards 10-page limitation. Please see Q 2 and Q4 on addendum.
We had understood at Pre-Proposal that these pages would not count. Please clarify.
A: The authorization themselves are not included in the ten pages, and though the
financial statements (tax return, etc.) are not either, a summary of the status of the
firm should be. From past experience, it did not typically take the full allotment
of pages for firms to make their case. Please focus on the content.