HomeMy WebLinkAboutWolfberg Alvarez
May 26, 2010
Ms. Jane A. Hines, CMC, City Clerk
City of Sunny Isles Beach
Government Center
18070 Collins Ave.
Sunny Isles Beach, FL 33160
RE: RFQ NO. 10-04-02 PROFESSIONAL ARCHITECTURAL SERVICES
Dear Ms. Hines and Selection Committee,
It is with great interest that Wolfberg Alvarez & Partners (WA), submits its qualifications to provide
Architecture services to the City of Sunny Isles Beach. As one of the most experienced multi-discipline
design and planning firms in South Florida, WA offers a full-range of comprehensive in-house architecture
services and will provide a single-source of responsibility for the City.
In working with public clients, WA has demonstrated a consistent ability to comprehend and meet the
requirements for the most challenging program, design, schedule and budgetary constraints whether it's a
new construction, engineering system upgrades or additions and modifications, which require close
coordination with the existing conditions. All proposed key personnel for this contract have extensive
experience working with public agencies and are intimately knowledgeable of zoning ordinances and
building codes. The firm takes great pride in delivering clear construction documents, specifications, and
other bid documents to its clients.
The firm has provided comprehensive design services totaling more than 157,000,000 SF in the last 15
years alone, for a diverse range of public clients including Broward County, City of Ft. Lauderdale, Miami-
Dade County, General Services Administration, City of Miami, City of Miami Beach, South Florida Water
Management District, NASA, Veterans Administration, State of Florida, Village of Palmetto Bay, Village of
Pinecrest, Internal Revenue Service, U.S. Department of Justice and Miami-Dade County Public Schools
to name a few.
WA has been recognized as one of the most dynamic architecture firms in the County and has earned a
reputation for initiative as well as outstanding achievement and performance. Working for public clients,
WA has demonstrated a consistent ability to comprehend and meet the requirements for the most
challenging projects and looks forward to providing the same level of service to the City.
I am confident that with our experience and size, WA will be able to respond to all of the City's design
needs. Equally as important, with our positive approach to problem solving, we will not only meet your
needs, we will offer a level of professional service that will exceed your expectations.
~eIY,
~1~rlO e, I
Sr. Vice President
. ,
M1 Wolfberg Alvarez & Partners
I I City of isles Beach
1..-: Professiocal Architectu",1 Services
. . ~!b\I?R ?n1rJ
Page 1
Wolfberg Alvarez & Partners
Wolfberg Alvarez & Partners (WA) is a local South Florida firm that has
established a national reputation for design initiative and performance.
Established in September 1976, by Julio E. Alvarez, PE and David A. Wolfberg,
AlA, the firm has provided comprehensive architectural and engineering design
services for a diverse range of public agencies and facilities across the country.
Recognized for outstanding achievement and project performance, WA has
been ranked among the top 60 Architecture/Engineering firms by Building
Design & Construction in their annual Survey of Top Firms and among the
"Architectural Giants" in the United States by Corporate Design and Realty.
The firm has received numerous design awards for both architectural and
engineering excellence, and throughout the years it has remained committed to
the basic precept of quality design.
As PUBLISHED IN
SOUTH FLORIDA BU5lNfSS JOURNAL
WA's staff consists of approximately 45 dedicated professional, technical and
support personnel. The in-house team assigned to each project assigned under
this contract will remain committed to that project for its duration, further
enhancing project team coordination. This system of communication and
continuity has resulted in an impressive record of successfully completed
projects. With a stable staffing level and exceptional professional expertise, WA has been able to respond
to projects of any scope and complexity while assuring the personal contact and attention required for
efficient and productive services.
WA possesses the design capability, organization, resources and commitment to meet the challenge of
this type of contract. With complete in-house capabilities in planning architecture, engineering disciplines,
and construction management services, WA is uniquely positioned to provide the Village of Palmetto Bay
with creative enthusiasm and technical leadership.
Financial Information and Corporate Charter
WA has demonstrated unique continuity, stability and financial
strength within the architectural and engineering community. WA
offers a sound business foundation in management and
methodology. Through traditional accounting and cash flow
management, the firm is able to project, control and report it's past,
daily and future operations in a professional and comprehensive
format.
Julio E. Alvarez, PE and David Wolfberg are the only individuals
holding financial interest in the firm. Mr. Alvarez is at 1500 San
Remo Ave., Coral Gables, FL 33146.
Annual revenues for the past two years are:
2009: $7,231,000
2008: $7,529,000
State of Florida
Department of State
I certify fmlll the fL'COroS of this office that WOLfUERGlALVAREZ
^ND PARTNERS, me is II corporation organized under the Jaws of
the State of florida, filed on Deccmber 17, lQR6
The document number of this corporntion is J47617.
I furtherl"ertify that said corporation has paid all fees due this office
lhmugh Decemher ]], 20]0, dJat its most recent annual report was flied
011 Fcbnillry II, 2010, and it~ ~tatus is active.
I furth",r certify lh;,t said corpor.ltion ha' not filed Articles of
Dissolution.
GI_ JllldH~' boma ,,"l1ll1t GtM.5tttf of
FI",jJn./JJT"JJ.ll"""i"~.Ij,..C"Pllal.lj,iJfbt
T_""~'
Secretary of State
~_..,..,."" -'._~'""~"" I
'.'w...""...;t.'"'..""""-,......,.,_~""........."'.,
n>..,.,._Jo'......,l..""'"',,"";....,.,..l.
bl1p!://..IIk...unbiz..ocW....n.u'bnr.b"".
Wolfberg Alvarez & Partners 2010
~... m ... . Alvarez & Partners
! . City of Sunny Isles Beach
:. ..... _ 'Professional Architectural Services
. . May 2010
Page 2
Past Performance on Public Projects
WA is extremely proud of its record of performance
with public agencies. The firm has continually
demonstrated its ability to manage cost and quality
and continues to receive high marks from its work
with Miami-Dade County Public Schools. The firm is
continuously evaluated by the school board and for
the last three years the firm has received a 4.8
average out of a possible 5.0 for its quality of work.
The firm also received a perfect score (4.0) on a
performance evaluation from Miami-Dade County
GSA for its work on the new Fleet Shop
Maintenance Facility.
Team Experience
WA is one of the largest multi-discipline A/E firms in the South Florida and has been recognized for
outstanding achievement and project performance. The firm has received numerous awards for
architectural design and engineering excellence. Throughout the years WA has remained committed to
basic precept of quality design. With in-house capabilities in architecture, HVAC, electrical, plumbing and
civil engineering disciplines, and interior design, the firm has met its commitments with an exceptional
balance between architectural design and engineering excellence. Our staff consists of approximately 45
enthusiastic professional, technical and support personnel.
WA has made a firm-wide commitment to continue developing a staff with particular expertise in IDIQ
requirements. We have a unique history and quality performance level of on-time and within budget for
similar contracts for public agencies, military and other federal agencies. Our projected work-load and
significant staff allows us to make available a team of experienced professionals with specialized
expertise in the type of work required. WA has the ability to respond immediately with any task, large or
small, upon notice to proceed:
. WA is a large, full service organization that offers a unique level of flexibility in being able to
accommodate unanticipated increases in the volume, requirements and skills needed to perform.
. With extensive experience on numerous multi-project term contracts, the firm is organized to
accommodate, and has experience in managing, shifts in volume of work.
. Through our office-wide team structure we are able to grow or shrink design teams as needed.
LEED
WA has extensive experience incorporating Energy Conservation features into the design of
governmental facilities. Energy Conservation plays an important role in the design approach undertaken
by WA on all of our projects. As far as our experience with "high performance green buildings" WA has
always been on the leading edge of technology in providing clients with energy efficient buildings and
systems such as thermal energy plants, cogeneration, solar collectors, efficient lighting systems, V A V and
variable pumping systems among others.
Ability to Perform the Work to Meet Schedule
. With a breadth of resources under one roof WA is able to adhere to any schedule mandated by the
City.
~. ..m . Woifberg Alvarez & Partners
! I City of Sunny Isles Beach
.. ... ..... I Prolessiocal Architectural Services
. .. . May 26,2010
Page 3
. WA has a unique history and performance level for on-call / term contracts for public agencies.
We have held successive term contracts with the Dade County Public School system since 1991. In that
time we have performed literally hundreds and hundreds of assignments for DCPS. The firm has the
ability to complete numerous projects, including simultaneous project assignments.
All senior level management and production personnel, including the Project Manager, Rafael Labrada
are located in this office.
In order to achieve the City's goals, WA will schedule and
attend regular meetings and workshops wherein ideas are
exchanged in an open forum. We anticipate charettes
either in our office or at the Owner's premises, wherein
our design team will sketch Concepts and ideas for quick
critique and review. We have found this practice to be
extremely well received, significantly reducing design time
and confusion. A picture, or in this case a sketch, is
invaluable to communicate a design direction. WA
possesses the design capability, organization, resources,
management structure, related experience and, most
importantly, the commitment to meet the challenge of this
project. With in-house capabilities in design, architecture, mechanical and electrical engineering, WA is
positioned to provide the City of Sunny Isles Beach with the creative enthusiasm and technical leadership
to achieve the transformation envisioned for this property.
The implementation of the necessary tasks required for the ultimate successful completion of this project
requires an approach wherein the project is to treat the entire process as one continuous flow of work and
build upon the events and decisions that have already been made.
Project Manager Experience
As Assistant Director of Architecture for WA, Rafael Labrada, AlA, LEED AP, will act as Project Manager
for this contract and managed all phases of planning and project development and design from
preliminary concepts and programming to final production. Mr. Labrada is located in WA's main office at
1500 San Remo Ave., Coral Gables, FL 33146, phone 305-666-5474, rlabrada@wolfbergalvarez.com.
The Project Manager will be the Team's single point of contact for the City of Sunny Isles Beach, as well
as for all other entities and agencies. The Project Manager, with the support and assistance of the
Architectural and Engineering Coordinators, will be responsible for assigning resources of the Team to the
various work tasks, and maintaining regular communication as to progress of work with the City's Project
Manager. He will oversee the overall design and production effort, and will monitor project schedule and
identify problems/issues to be resolved in a timely manner. He will establish and implement the Team's
quality assurance/quality control process, and will be responsible for scheduling internal project reviews of
all submittals before they are delivered to the client.
Mj... ........ . Wolfberg A.lvarez & Pariners
i I City of Sunny isles Beach
:. ~ i. Professional ,Archiiectural Services
May 2010
Page 4
Relevant Experience
During its 33 years in business, WA has successfully completed more than 300 project under
miscellaneous and continuing service contracts for more than 60 governmental agencies throughout the
United States.
. WA understands these contracts often involve the completion of several, simultaneous tasks.
. WA is equipped to accomplish multiple, concurrent assignments with efficiency.
. WA is able to respond to diverse project types and works orders with its in-house staff.
Professional Qualifications
WA is continually recognized for outstanding achievement and project performance and has received
numerous awards for architectural design and engineering excellence. Throughout the years WA has
remained committed to basic precept of quality design. With in-house capabilities in architecture, HVAC,
electrical, plumbing and civil engineering disciplines, and interior design, the firm has met its commitments
with an exceptional balance between architectural design and engineering excellence.
We have made a firm-wide commitment to continue developing a staff with particular expertise with similar
contract requirements. We have a unique history and quality performance level of on-time and within
budget for similar contracts for the military and other federal and local agencies. Our projected work-load
and significant staff allows us to make available a team of experienced professionals with specialized
expertise in the type of work required. We have the ability to respond immediately with any task, large or
small, upon notice to proceed.
~ Wolfberg AJvarez & Partners
City of Isles Beach
i.' .-.........1 Professional Architectural Serr/ices
May 26, 2010
Page 5
Current and Recently Completed Project Past Five Years
Project Contract Scope of Services Contact
Length
MIC Central Station, 2006-2010 Civil Engineering, Site Adaption, Lighting, Marino Llamas
Miami International Pedestrian Safety, Traffic Calming, Raised 305-592-4800
Airport Sidewalks
Palmetto Bay 2006-2009 Architecture, Interior Design, Civil, Mechanical Ed Silva
Library and and Electrical Engineering, Construction 305-259-1250
Community Center Management
NASA Operations 2005-2007 Architecture, Interior Design, Civil, Mechanical Brian Graf
Support Building II and Electrical Engineering, 321-867 -6039
Construction Management
Mary Brickell Village 2006-2009 Architecture, Interior Design, Civil, Mechanical Jose Viana
and Electrical Engineering, 305-562-8096
Construction Management
Camillus House 2007-2010 Architecture, Programming, Electrical, Karen Mahar
Center Mechanical, Plumbing and Civil Engineering, 305-374-1065
LEED
Flamingo Park 2008-2010 Architecture, Programming, Electrical, Mario Gonzalez-Pola
Master Plan and Mechanical, Plumbing and Civil Engineering 786-295-8001
Tennis Center
Red Road 2006-2009 Architecture, Programming, Electrical, Jay Jacobson
Commons Mechanical, Plumbing and Civil Engineering 561-893-0094
GSA Fleet 2008-2010 Architecture, Civil, Mechanical and Electrical Asael Ace Marrero
Maintenance Shop Engineering, Construction Management 305-375-1115
Facility
City of Miami Fire 2008-2010 Architecture, Civil, Mechanical and Electrical Sandra Vega
Station No. 11 Engineering, Construction Management 305-416-1243
Vizcaya 2009-2011 Architecture, Programming, Electrical, Leigh Heinlein
Miscellaneous Mechanical, Plumbing and Civil Engineering 305-860-8449
Architectural
Contract
Florida International 2009-2010 Architecture, Programming, Planning Alberto Delgado
University 305-348-4036
Architectural
Contract
Sunset Elementary 2008-2010 Architecture, Programming, Electrical, Shari Lee
Classroom Building Mechanical, Plumbing and Civil Engineering 305-995-1446
Addition
~ VVoifberg Alvarez & Partners
: l City of Sunny Isies Beach
.... .... .. p. rofessional Architectural Services
.m May 2010
Page 6
Current and Recently Completed Project Past Five Years
Project Contract Scope of Services Contact
Length
Southside Elementary Architecture, Programming, Electrical, Shari Lee
Classroom Building Mechanical, Plumbing and Civil Engineering 305-995-1446
Addition
BMllnsurance 2009-2010 Architecture, Programming, Electrical, Anthony Sierra
Mechanical and Plumbing 305-443-2898
Florida City Youth 2008-2009 Architecture, Civil, Mechanical and Gene Leon
Center Electrical Engineering 305-247-8221
Miami-Dade County Water 2009-2011 Architecture, Programming, Electrical, Franklyn Jarman
& Sewer Maintenance Mechanical, Plumbing and Civil Engineering 786-552-8555
Facility
City of Miami 2008-2010 Architecture, Programming, Electrical, Jose Puentes, AlA
Miscellaneous Architectural Mechanical, Plumbing and Civil Engineering 305-416-1275
Contract
U.S. Coast Guard Architecture, Programming, Electrical, Carlos Viteri
Mechanical, Plumbing and Civil Engineering 757-873-0406
Southwood Middle School 2008-2009 Architecture, Programming, Electrical, Shari Lee
Classroom Building Mechanical, Plumbing and Civil Engineering 305-995-1446
Addition
Miami Beach Property 2010-2011 Architecture, Programming, Electrical, Thais
Management Facility Mechanical, Plumbing and Civil Engineering
~ flJvar0z & Partners
i : City of Isles Beach
I.. . ......... . .......' Professional A~hiledural Services
. . May 2010
Page 7
MIAMI-DADE COUNTY, FLORIDA
Capital Improvements Information System
General Services Administration
Project Evaluation
Evaluation Type: Standard Evaluation
Contract:
Contract Name:
Award Amount:
Contract Type:
Contractor /
Consultant:
W20019 Work Order No: N/A
Design Services for the Construction of a new Fleet Shop 1 Maintenance/Office/Parking Facility
Contact: Asael Marrero
305-375-1115
$1,404,300.00
PSA
Wolfberg/Alvarez and Partners, Inc. FEIN: 591713092
PROJECT TECHNICAL CERTIFICATION REQUIREMENTS:
I Ratin~ II I
I II 4 II 3 I [I] I 1 II N/A IICriteria I
DLJDDDD Schedule - Quality of schedule & adherence to schedule
resulting in timeliness and minimizing delay to the owner and
community.
D~DDDD Cost effectiveness & efficiency - Budget compliance & value of
work.
~QJI 1c=J1 1c=Jlvision - Design - Concepts or adherence to criteria. I
D~DDDD Coop~ration - Teamwork & relationship with owner, subs and
suppliers.
D~DDDD Coordination - Ability to organize, schedule and complete
tasks in adherence to the schedule.
DLJDDDD Accuracy & Technical Skills - Cost estimating, scheduling,
shop and other drawings, plans, manuals, project
documentation and conflict resolution.
D~DDDD Completeness - Compliance with contract documents, i
permits, Codes & standards.
D~DDDD Responsiveness - Timely, clear & concise responses to owner
comments and correspondence.
[9=IQJI 1c=J1 1c=JICommitment - Intangibles & contribution to project success. I
~QJI 1c=Jc=Jc=JIPersonnel - Quality and dedication of project staff. I
rrr=JQJI 1c=J1 1c=JIManagement - Leadership ability. I
~QJI 1c=JL--Jc=JIQuality - Work performed correctly the first time. I
Overall Performance Average: 4.0
Documentation that supports this evaluation and Contractor's/Consultant's comments can be obtained by
contacting:
Asael Ace Marrero at Phone# (305) 375-1115
Evaluation Reviewed by: Supervisor I....! Division Chief 0 Assistant Director 0
The method of delivery of this evaluation to contractor/consultant: Certified Mail
Hand
(Unresponsive Performance by contractor/consultant requires 2 delivery methods)
Evaluation delivered to: Marcel Morlote, AlA
Director 0
EMail Fax l""-
Evaluator 10: asaelm
Date: 7/8/2009
Period: Interim
~.... . ............ Wolfberg ,Alvarez & Partners
i I City of Sunny Isles Beach
.1. ~.. ._; Professional Architectural Services
.. · May 2010
Page 8
e MIAMI BEACH
City of Miami Beach, 1700 Convention Center Drive, Miami Beach, Florida 33139, www.miamibeachR.gov
CAPITAL IMPROVEMENT PROJECTS OffiCE
Tel: 305.673-7071, Fox: 305-673-7073
September 18, 2009
Mr. Marcel Morlote, AlA
Senior Vice President
Wolfberg Alvarez & Partners
1500 San Remo Ave.
Coral Gables, FL 33146
Dear Marcel:
I want to take a minute to express my satisfaction with the performance of your
firm. Wolfberg Alvarez & Partners (WAP) has been instrumental in the
successful development of the new master plan for Flamingo Park, which
includes a new Tennis Center facility and courts for the City of Miami Beach,
Florida. As the Project Managerforthe project, I am thoroughly impressed with
WA, and to date, the firm has met and many times exceeded the City's
expectations meeting the demands of this $10.3 million dollar project.
WAP's professionalism and ability to handle major project issues with its in-
house forces was very helpful in timely addressing unforeseen issues, that
often time arise with less experienced teams of professionals/designers. Your
team conducted several community workshop presentations and shared its
vision with the residents and City staff. Your team's availability to rapidly
respond to program changes as requested by the City and its residents
significantly reduced the impacts to the project's schedule.
I look forward to finalizing this project and I am certain it will be a great addition
to the City.
Sincerely,
\
.
zalez-Pola
apital Projects Coordinator
Vv'e ore CDmrn:rted to prov:d!,~,g e;.;ceiJenf pubk service ord setety 10 01/ .....(:0 he, work, end pto~/ J1 cur vibrcnr, t:op.,col
comrr;un,,:ry
~ Woifberg Alvarez & Partners
i i City of Sunny Isles Beach
':. ... . : Professional Architectural Services
... ........ m 2010
Page 9
Proposed Personnel/Organizational Chart
Lead Designer
Aris Garcia, AlA
Project Architects
Aida Sanchez-Gomez, AlA, LEED AP
Rafael Guissarri, AlA, LEED AP
Technical Staff
Eric Slay, LEED AP
Pablo Valin
Gustavo Alberti
Jose Aldir
Bernard Chan
Porter Miller
~..... ...... . VVolfberg .AJvarez & Partners
I : City of Isles Beach
!. .. Professional Architecturai Services
. May 2010
Page 10
ARCHITECT-ENGINEER QUALIFICATIONS
PART-1 CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State):
Professional Architectural Services, Sunny Isles Beach, FL
2. PUBLIC NOTICE DATE: 13. SOLICITATION OR PROJECT NUMBER: No. 10-04-02
May 2010
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE: Marcel Morlote, AlA
5. NAME OF FIRM: Wolfberg Alvarez & Partners, Inc., 1500 San Remo Ave., Ste. 300, Coral Gables, FL 33146
6. TELEPHONE NUMBER: 17. FAX NUMBER: 18. EMAIL ADDRESS:
305-666-5474 305-665-4293 mmorlote@wolfbergalvarez.com
C. PROPOSED TEAM
(Complete this Section for the prime contractor and all key subcontractors)
(Check)
-u z-uc.... ;o-lcn
~ m)>'f ~5i
s:: ;0;0
-;-i nn
m -10
o~ 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
Programming, Architecture,
Wolfberg Alvarez & Partners 1500 San Remo Avenue, Suite 300 Interiors, Planning, Cost Esti-
(Minority Owned Business) Coral Gables, Florida 33146 mating, Construction Admini-
stration. Overall Team Man-
a. X CHECK IF BRANCH OFFICE agement & Design
b. CHECK IF BRANCH OFFICE
c. ~uc~v or DD^,O~U ",,,,,r<=
d. ~o or~O/ or nn ^ ,,~, 0 "",,,r,,
e. rH<=rK IF BRANrH OFFIr.F
f.
D. ORGANIZATIONAL CHART OF PROPOSED
GJ (Attached)
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. NAME: 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Marcel Morlote, AlA Principal-in-charge
a. TOTAL I b. WITH CURRENT FIRM
33 29
15. FIRM NAME AND LCOATION (CITY AND STATE)
Wolfberg Alvarez & Partners. Inc., 1500 San Remo Ave.. Ste. 300, Coral Gables, FL 33146
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
1978/Bachelor of Science/ Architecture/ University of Miami 1982/Registered ArchitecUFlorida/#AR9564
NCARB Certification
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Eta.)
As Principal-in-charge for this project Mr. Morlote is responsible for the assignment of team resources for all task assignments Monroe
Countv aives the team. He will manaae each team on a task basis to ensure schedule, cost and qualitv compliance.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (Cily and State) (2) YEARS COMPLETED
NASA Operations Support Building II, Kennedy Space Center,
FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2004-2007 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Principal-in-charge for the design of a new five-story 200,000 SF Operations Center. The facility will replace the existing sub-
standard facility and include administrative offices, conference rooms, classrooms, laboratories, equipment maintenance
rooms, video conferencing rooms, telecommunication rooms, a sundry store and VIP observation platform.
X Check if Project performed with current firm.
b. (1) TITLE AND LOCATION (Cily and State) (2) YEARS COMPLETED
General AlE Consulting for the Village of Palmetto Bay. Palmetto
Bay. FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2006 2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Principal-in-charge for multi-disciplined engineering and architectural support services the City for a variety of projects. This included
Preparation of studies and reports, planning, design of building additions and improvements. upgrading of engineering systems, site
planning and improvements, Preparation of construction documents, Construction phase services.
X Check if Project performed with current firm.
c. (1) TITLE AND LOCATION (Cily and State) (2) YEARS COMPLETED
Vizcaya Museum and Gardens Miscellaneous Continuing PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Contract, Miami, FL 2009 2010
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Principal-in-charge for Architectural and Engineering services to the Historic Vizcaya Museum and Gardens. The projects under this
contract include Architectural restorations, re-roofing, re-painting. ADA enhancements, Electrical Upgrades. Stormwater Discharge
Management System and new building construction. In addition to the project scope WA also is assisting in the bidding and permitting
phase of the project along with Construction Administration services.
X Check if Project performed with current firm.
d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Three AlE Consulting Contracts with GSA. Region 4 for New Con- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
struction and Improvements to US Post Offices, Courthouses and 1987-1990,1991-1994. 1987-1990.1991-1994,
Other Federal Buildings throughout the Southeastern US 1995-1998 1995-1998
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Principal-in-charge for three (3) separate consulting contracts involving AlE investigations and design, as well as construction admini-
stration services, for a variety of alterations and improvements to US Post Offices and Federal buildings in the Southeastern United
States.
X Check if Proiect oerformed with current firm.
e. (1) TITLE AND LOCATION (Cilyand State) (2) YEARS COMPLETED
U.S. Coast Guard Housing. Grassy Key, Marathon, FL
PROFESSIONAL SERVICES T CONSTRUCTION (If Applicable)
2009 2010
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Principal-in-charge for Program EvaluationNerification, as well as complete Architectural. Electrical. Mechanical. Plumbing and Civil
Engineering services including the development of construction documents. construction period services and Project Management for
the project. The project consists of the proposed phased development of eleven (11) residential units to be constructed in the Sunset
Bay subdivision on Grassy Key. Marathon. Florida and intended for use by U.S. Coast Guard personnel stationed at the USCG Station
Marathon.
X Check if Project performed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Rafael Labrada, AlA. LEED AP Project Manager a. TOTAL I ~ WITH CURRENT FIRM
10
15. FIRM NAME AND LCOATION (CITY AND STATE)
Wolfberg Alvarez & Partners. Inc., 1500 San Remo Ave., Ste. 300, Coral Gables, FL 33146
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
1999/Master of Architecture/Georgia Tech Florida/ AR92404
1997/BS Architecture/Florida I nternational University
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Etc.)
As Assistant Director of Architecture, Mr. Labrada has been instrumental to the development and support of numerous of the firms
largest and most prestigious projects. including projects for various local government agencies. In addition to his vast experience as
an Architectural Coordinator he heads the firms efforts in LEED accreditation.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Kaplan University. Ft. Lauderdale, FL PROFESSIONAL SERVICES 1 CONSTRUCTION (If Applicable)
2005-2007 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for tenant improvements to 100,000 SF of office space. including Admissions, Financial Aid, Student Support, Fi-
nance, Student Accounts and Academic Leaders offices. The building will also house an employee cafeteria for 1,400 people. a sun-
dry store. and video conferencing capabilities and a state-of-the-art Data Center including self sustaining capabilities for complete
building operations for seven days. Project cost: $5,000,000
X Check if Project performed with current firm.
b. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
General Consultant Contract for Village of Pinecrest, Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2002 2004
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for the new Pinecrest Municipal Center, Village Hall and Police Department as part of a General Consulting Contract.
The new facility is home to the Village of Pinecrest's Village Hall and Police Department. The Municipal Center serves as the Village's
seat of government and houses the Village's Building and Zoning Department, as well as their Police Station.
X Check if Project performed with current firm.
c. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
General AlE Consulting for the Village of Palmetto Bay. Palmetto PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Bay, FL 2006 2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECifiC ROLE
Project Architect for multi-disciplined engineering and architectural support services the City for a variety of projects. This included
Preparation of studies and reports, planning, design of building additions and improvements, upgrading of engineering systems. site
planning and improvements, Preparation of construction documents. Construction phase services.
X Check if Project performed with current firm.
d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Single and Multi-story Modular Classroom Building Program, PROFESSIONAL SERVICES 1 CONSTRUCTION (If Applicable)
Miami, FL 2004-2007 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLL
Project Architect for the design and construction administration services for new construction. renovations and expansion of chiller
plants to some 12 schools in Miami Dade County as part of the 2006 Modular Construction Program. The program also entails the
addition of new Art & Music buildings, new Chiller Plant buildings, new P.E. Shelters and Storage buildings, remodeling of existing
building and major renovations of single and multi-story modular classroom buildings. Project cost: $50,000.000.
X Check if Project performed with current firm.
e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
City of Miami General Consulting Contract, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2008-2009 2008-2009
(3) BRIEF DESCRIPTION (Bnef Scope, size. cost, etc.) AND SPECIFIC ROLE
Project Manager for various task orders that include mechanical, electrical and plumbing upgrades. Project includes a ne roofing sys-
tem and site improvements including a new parking lot with drainage and fencing for security. Other tasks include ADA upgrades to
building around the City. Project cost varies from $50.000 to $250.000.
X Check if Project performed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. NAME: 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Aris Garcia. AlA Lead Designer
a. TOTAL I b. WITH CURRENT FIRM
25 22
15. FIRM NAME AND LCOATION (CITY AND STATE)
Wolfberg Alvarez & Partners. Inc., 1500 San Remo Ave., Ste. 300, Coral Gables, FL 33146
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
1983/Bachelor of Architecture/ University of Miami 1995/Registered Architect/Florida/#AR15263
Graduate studies toward Masters of Urban Planning Registered Interior Designer/ Florida # ID 3665
NCARB Certification
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Etc.)
Mr. Garcia is experienced in all phases of planning and project development. from preliminary concepts and programming through final
design and production of construction documents, for both private and public sector clients. He has been involved in numerous projects
for new construction, renovations and interior alterations to various schools and government facilities throughout South Florida.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Three AlE Consulting Contracts with GSA. Region 4 for New Con- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
struction and Improvements to US Post Offices, Courthouses and 1987-1990,1991-1994, 1987 -1990, 1991-1994.
Other Federal Buildings throughout the Southeastern US. 1995-1998 1995-1998
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Manager for three (3) separate consulting contracts involving AlE investigations and design, as well as construction administra-
tion services, for a variety of alterations and improvements to US Post Offices and Federal buildings in the Southeastern United States.
X Check if Project performed with current firm.
b. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Vizcaya Museum and Gardens Miscellaneous Continuing PROFESSIONAL SERVICES T CONSTRUCTION (If Applicable)
Contract, Miami. FL 2009 2010
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Principal-in-charge for Architectural and Engineering services to the Historic Vizcaya Museum and Gardens. The projects under this
contract include Architectural restorations, re-roofing, re-painting. ADA enhancements. Electrical Upgrades, Stormwater Discharge
Management System and new building construction. In addition to the project scope WA also is assisting in the bidding and permitting
phase of the project along with Construction Administration services.
X Check if Proiect performed with current firm.
c. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Renovation and Energy Retrofit of Public Schools, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
County. FL 2001-2003 2001-2003
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc,) AND SPECIFIC ROLE
Project Manager for Architectural services for investigations and design for renovation and retrofit of elementary, junior and
senior high schools including the renovation of Miami Beach Senior High School including modernization of the auditorium and
renovation to Miami Center Central High. Various projects ranging is cost from $100,000 to $1,000,000.
X Check if Proiect oerformed with current firm.
d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
General Consultant Contract for Village of Pinecrest, Pinecrest. FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2002 2004
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Manager for multi-disciplined engineering and architectural support services the City for a variety of projects. This included fea-
sibility studies and reports. planning. additions and improvements, upgrading of engineering systems, site planning and improvements.
Preparation of construction documents.
X Check if Project performed with current firm.
e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
City of Miami General Consulting Contract, Miami, FL PROFESSIONAL SERVICES T CONSTRUCTION (If Applicable)
2008-2009 2008-2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Manager for various task orders that include mechanical, electrical and plumbing upgrades. Project includes a ne roofing sys-
tem and site improvements including a new parking lot with drainage and fencing for security. Other tasks include ADA upgrades to
building around the City. Project cost varies from $50.000 to $250,000.
X Check if Proiect oerformed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Aida Sanchez-Gomez, AlA, LEED AP Project Architect a. TOTAL I ; WITH CURRENT FIRM
10
15. FIRM NAME AND LCOATION (CITY AND STATE)
Wolfberg Alvarez & Partners, Inc., 1500 San Remo Ave., Ste. 300, Coral Gables, FL 33146
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
Bachelor of Architecture University of Miami, 1998 Florida No. AR 92983
18. OTHER PROFESSIONAL QUAUFICATIONS (Publications, Organizations, Training, Awards, Etc.)
Mrs. Sanchez-Gomez experience comprises work involving government. institutional. commercial. residential. medical and transporta-
tion facilities. Since joining Wolfberg Alvarez and Partners. she has been involved in the design and planning of some of the firm's
latest projects including work on the Big Cypress Basin Maintenance Facility, Chemistry Laboratory for South Florida Water Manage-
ment District, Camillus House Campus and for Miami-Dade County Public Schools.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Kaplan University, Ft. Lauderdale, FL PROFESSIONAL SERVICES T CONSTRUCTION <If Applicable)
2005-2007 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for tenant improvements to 100,000 SF of office space, including Admissions, Financial Aid, Student Support, Fi-
nance, Student Accounts and Academic Leaders offices. The building will also house an employee cafeteria for 1,400 people. a sun-
dry store, and video conferencing capabilities and a state-of-the-art Data Center including self sustaining capabilities for complete
building operations for seven days. Project cost: $5,000,000
X Check if Project performed with current firm.
b. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
General Consultant Contract for Village of Pinecrest, Pinecrest, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2004-2006 2004
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for the new Pinecrest Municipal Center, Village Hall and Police Department as part of a General Consulting Contract.
The new facility is home to the Village of Pinecrest's Village Hall and Police Department. The Municipal Center serves as the Village's
seat of government and houses the Village's Building and Zoning Department. as well as their Police Station.
X Check if Project performed with current firm.
c. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
General NE Consulting for the Village of Palmetto Bay, Palmetto PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Bay, FL 2006 2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for multi-disciplined engineering and architectural support services the City for a variety of projects. This included
Preparation of studies and reports. planning. design of building additions and improvements. upgrading of engineering systems, site
planning and improvements. Preparation of construction documents, Construction phase services.
X Check if Project performed with current firm.
d. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
City of Miami General Consulting Contract, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2008-2009 2008-2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Manager for various task orders that include mechanical, electrical and plumbing upgrades. Project includes a ne roofing sys-
tem and site improvements including a new parking lot with drainage and fencing for security. Other tasks include ADA upgrades to
building around the City. Project cost varies from $50,000 to $250,000.
X Check if Project performed with current firm.
e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
MDCPS Relocatable Classrooms Replacement Project PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2004-2007 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for approximately 18,000 new student stations as part of the Relocatable Classroom Replacement projects.
In that capacity, WA provided AlE Design Site Adaptation Services for new construction and renovations to some 28 schools
in Miami Dade County. Project cost: $60,000,000.
X Check if Proiect performed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. NAME. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Rafael Guissarri, AlA, LEED AP Project Architect a. TOTAL I 3 WITH CURRENT FIRM
9
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
Bachelor of Science Architecture, Universidad de Registered Architect / Florida # AR93858
Belgrano Buenos Aires, Argentina 1998
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Eta)
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED
Florida City Youth Community Center, PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Florida City, FL 2008 2010
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for a new 21,500 SF youth activity and community center for the City of Florida City. The cen-
ter features a wide range of activities for specialized uses including an indoor basketball gym with folding
bleachers that seat 240 people. The buildings surround a secure open courtyard in which social activities and
other events can take place.
x Check if Proiect performed with current firm.
b. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED
GSA Fleet Shop 1 Maintenance Facility, PROFESSIONAL SERVICES I CONSTRUCTION2fOprOble)
Miami, FL 2008
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for a new light vehicle maintenance facility for Miami-Dade County with 28 service bays, vehi-
cle parking with approximately 475 spaces and 20,000 SF of general office space. Total building area is ap-
proximately 252,000 GSF. The facility will have an adjacent fueling island and emergency back-up system to
allow for operations after a storm event. This building will be LEED Silver.
x Check if Proiect oerformed with current firm.
c. (1) TITLE AND LOCATION (efty and State) (2) YEARS COMPLETED
Kaplan University Administration Building, PROFESSIONAL SERVICES I CONSTRUCTION2tOOigble)
Ft. Lauderdale, FL 2008
(3) BRIEF DESCRIPTION (Briet Scope. size, cost, etc.) AND SPECIFIC ROLE
Project Architect for a new 200,000 GSF, Class A multi-story support building. Building included ultra-modern
classrooms and research laboratories the building houses 960 office spaces, a 300-person mission conference
center with observation deck, training rooms, computer rooms, multi-media conference rooms, technical librar-
ies, snack bar/cafeteria, storage, internal and external employee break areas, retail, miscellaneous support
areas and parking.
x Check if Project performed with current firm.
d. (1) TITLE AND LOCATION (efty and state) (2) YEARS COMPLETED
Village of Palmetto Bay Community Center & Li- PROFESSIONAL SERVICES I CONSTRUCTION2fOOgble)
brary, Village of Palmetto Bav, FL 2006
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for a new 15,000 SF Community Center and Library. The two-story Community Center will
offer a meeting and performance space for events, lectures, and community activities. The first story will be
dedicated to theatre space for special performances and serve as an additional outdoor area for lectures,
workshops and children's activities.
x Check if Project performed with current firm.
e. (1) TITLE AND LOCATION (Cffy and State) (2) YEARS COMPLETED
Miami-Dade County Public Schools Information PROFESSIONAL SERVICES 1 CONSTRUCTION2100Igable)
Technology Systems Building, Miami, FL 2008
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for the tasks of preparing a report of the existing conditions and evaluate the prospects of up-
grading/replacing the electrical system components and related emergency equipment. This report addresses
the existing configuration of the main normal electrical service, emergency power generation, and UPS sys-
tems and will provide recommendations.
x Check if Proiect performed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. NAME. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Gustavo Alberti Architecture I 6 WITH CURRENT FIRM
a. TOTAL
7
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
2003 / Miami Dade College / A.A.
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Ete)
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (Cfty and Slale) (2) YEARS COMPLETED
Village of Palmetto Bay Community Center and Li- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
brary, Villaqe of Palmetto Bav, FL 2006 2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for a new 15,000 SF Community Center and Library. The two-story Community Center will of-
fer a meeting and performance space for events, lectures, and community activities. The first story will be dedi-
cated to theatre space for special performances and serve as an additional outdoor area for lectures, work-
shops and children's activities.
x Check if Project performed with current firm.
b. (1) TITLE AND LOCATION (Cfty and Slale) (2) YEARS COMPLETED
City of Miami Fire Station No. 11, Miami, FL PROFESSIONAL SERVICES 1 CONSTRUCTION 2011'Qble)
2008
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for a new 10,000 SF Fire Station for the City of Miami. The station is equipped with two bays
(16'x70'x16') for rescue vehicles, sleeping quarters for six fire fighters, a biohazard room for used medical sup-
plies, a Cascade room for storage and preparation of oxygen bottles, and a commercial kitchen. This station will
be used as a prototype for the construction of at least two more facilities.
x Check if Project performed with current firm.
c. (1) TITLE AND LOCATION (Cfty and Slale) (2) YEARS COMPLETED
Camillus House Center, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION 2011'Qble)
2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for a new center focused on expanding the knowledge-base surrounding homeless issues, and
improving the capacity and effectiveness of individuals, organizations, and systems serving persons experienc-
ing homelessness. The campus will include multiple buildings, totaling 215,000 SF, 340 beds, and the most
complete range of social and clinical services available in South Florida to serve an estimated 4,300 individuals
each year.
x Check if Proiect performed with current firm.
d (1) TITLE AND LOCATION (Cfty and stale) (2) YEARS COMPLETED
City of Miami General Consulting Contract, PROFESSIONAL SERVICES I CONSTRUCTION 200gble)
Miami, FL 2008
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project architect for various task orders that include mechanical, electrical and plumbing upgrades. Project in-
cludes a new roofing system and site improvements including a new parking lot with drainage and fencing for
security. Other tasks include ADA upgrades to building around the City.
X Check if Project performed with current firm.
e (1) TITLE AND LOCATION (Cftyand Slale) (2) YEARS COMPLETED
Kaplan University, Ft. Lauderdale, FL PROFESSIONAL SERVICES I CONSTRUCTION 2007ble)
2005
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Architect for the tenant improvements to 100,000 SF of office space, including Admissions, Financial
Aid, Student Support, Finance, Student Accounts and Academic Leaders offices. The building has an employee
cafeteria for 1,400 people and a state-of-the-art Data Center including self sustaining capabilities for complete
building operations for 7 days.
x Check if Proiect performed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Eric Slay, LEED AP Construction Administration a. TOTAL I ~ WITH CURRENT FIRM
16
15. FIRM NAME AND LCOATION (CITY AND STATE)
Wolfberg Alvarez & Partners. Inc., 1500 San Remo Ave., Ste. 300, Coral Gables, FL 33146
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
Associates of Art/1992 Architecture and Engineering, Miami Dade
College Miami, FL
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Etc)
LEED Certified. Mr. Slay has more than 15 years of experience providing Construction Administration Phase functions.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Kaplan University, Ft. Lauderdale, FL PROFESSIONAL SERVICES I CONSTRUCTION (11 Applicable)
2005 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Construction Administration for a project consisting of tenant improvements to 100,000 SF of office space. including Admissions, Fi-
nancial Aid, Student Support. Finance. Student Accounts and Academic Leaders offices. The building will also house an employee
cafeteria for 1,400 people, a sundry store. and video conferencing capabilities and a state-of-the-art Data Center including self sus-
taining capabilities for complete building operations for seven days. Project cost: $5,000.000
X Check if Project performed with current firm.
b. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
Ernest Graham Elementary. Hialeah. FL PROFESSIONAL SERVICES T CONSTRUCTION (If Applicable)
2006 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost. etc.) AND SPECIFIC ROLE
Construction Administration and Inspection services for a new three-story modular classroom building and new stand-alone student
dining facility and ancillary improvements. Site improvements consisted of an additional 74 on-grade parking spaces. renovations to
existing parking area and a new water main extension. Site improvements to the drainage system was also included in the scope of
work. Project cost: $7,000,000
X Check if Project performed with current firm.
c. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
General AlE Consulting for the Village of Palmetto Bay, Palmetto PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Bay, FL 2006 2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Construction Administration for multi-disciplined engineering and architectural support services the City for a variety of projects. This
included Preparation of studies and reports, planning. design of building additions and improvements. upgrading of engineering
systems, site planning and improvements. Preparation of construction documents. Construction phase services.
X Check if Project performed with current firm.
d. (1) TITLE AND LOCATION (City and State) I (2) YEARS COMPLETED
Single and Multi-story Modular Classroom Building Program, PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Miami, FL 2004 2007
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLL
Electric engineer for the design and construction administration services for new construction. renovations and expansion of
chiller plants to some 12 schools in Miami Dade County as part of the 2006 Modular Construction Program. The program
also entails the addition of new Art & Music buildings, new Chiller Plant buildings, new P.E. Shelters and Storage buildings,
remodeling of existing building and major renovations of single and multi-story modular classroom buildings. A partial listing
of those projects follows. Project cost: $50.000,000.
X Check if Project performed with current firm.
e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
Ruth K. Broad I Bay Harbor K-8, Bay Harbor, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2007 2008
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Construction Administration Phase services for the expansion of Bay Harbor K-8 School in strict coordination with the Town of Bay
Harbor. The project comprised the expansion of the school from an elementary to a K-8. In addition to the new buildings and ancillary
areas. extensive site improvements and landscaping are also included in this project as well as re-grading of the entire site for proper
drainage, new surface parking lot for staff and visitors, new recreational facilities (sports fields), a water main extension. new drainage
system with gravity wells and extensive landscaping and irrigation. Project cost: $18,000.000.
X Check if Project performed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
E. RESUMES OF KEY PERSONNEL
(Complete one Section E for each key person)
12. NAME: 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Raul Estevez Quality Control Coordinator
a. TOTAL I b. WITH CURRENT FIRM
33 27
15. FIRM NAME AND LCOATION (CITY AND STATE)
Wolfberg Alvarez & Partners, Inc.. 1500 San Remo Ave.. Ste. 300, Coral Gables, FL 33146
16. EDUCATION (DEGREE & SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
Completed course work towards mechanical engineering degree Not applicable
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, Etc.)
Mr. Estevez, as VP of Project Management serves as a Project Manager and/or an Engineering Coordinator for the programming, plan-
ning. design and construction of WA's projects. He has taken a leadership role in the development of a wide range of complex projects
throughout the South Florida area. Mr. Estevez has been responsible for various large-scale and complex ventures such as the North
Terminal C-D Infill at the Miami International Airport among many at MIA and for various projects with local municipalities.
19. RELEVANT PROJECTS
a. (1) TITLE AND LOCATION (Cilyand Slale) (2) YEARS COMPLETED
Three AlE Consulting Contracts with GSA. Region 4 for New Con- PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
struction and Improvements to US Post Offices, Courthouses and 1987-1990.1991-1994, 1987-1990,1991-1994,
Other Federal Buildings throughout the Southeastern US. 1995-1998 1995-1998
(3) BRIEF DESCRIPTION (Bnef Scope, size, cost, etc.) AND SPECIFIC ROLE
Quality Control Coordinator for three (3) separate consulting contracts involving AlE investigations and design, as well as construction
administration services, for a variety of alterations and improvements to US Post Offices and Federal buildings in the Southeastern
United States.
X Check if Project performed with current firm.
b. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
U.S. Coast Guard Housing, Grassy Key, Marathon, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2009 2010
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Project Manager for Program EvaluationNerification. as well as complete Architectural, Electrical, Mechanical, Plumbing and Civil Engi-
neering services including the development of construction documents, construction period services and Project Management for the
project. The project consists of the proposed phased development of eleven (11) residential units to be constructed in the Sunset Bay
subdivision on Grassy Key, Marathon. Florida and intended for use by U.S. Coast Guard personnel stationed at the USCG Station
Marathon.
X Check if Project performed with current firm.
c. (1) TITLE AND LOCATION (City and Slale) (2) YEARS COMPLETED
Renovation and Energy Retrofit of Public Schools, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
County, FL 2001-2003 2001-2003
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Quality Control Coordinator for Architectural services for investigations and design for renovation and retrofit of elementary,
junior and senior high schools including the renovation of Miami Beach Senior High School including modernization of the
auditorium and renovation to Miami Center Central High. Various projects ranging is cost from $100,000 to $1,000,000.
X Check if Project performed with current firm.
d. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
City of Miami General Consulting Contract, Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
2008-2009 2008-2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Quality Control for various task orders that include mechanical, electrical and plumbing upgrades. Project includes a ne roofing system
and site improvements including a new parking lot with drainage and fencing for security. Other tasks include ADA upgrades to building
around the City. Project cost varies from $50.000 to $250,000.
X Check if Project performed with current firm.
e. (1) TITLE AND LOCATION (City and State) (2) YEARS COMPLETED
General AlE Consulting for the Village of Palmetto Bay, Palmetto PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable)
Bay, FL 2006 2009
(3) BRIEF DESCRIPTION (Brief Scope, size, cost, etc.) AND SPECIFIC ROLE
Quality Control Coordinator for multi-disciplined engineering and architectural support services the City for a variety of projects. This
included Preparation of studies and reports, planning. design of building additions and improvements, upgrading of engineering sys-
tems. site planning and improvements. Preparation of construction documents, Construction phase services.
X Check if Project performed with current firm.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. Example Project Key
QUALIFICATIONS FOR THIS CONTRACT Number
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete section F for each project.)
21. TITLE AND LOCATION (City and State)
General AlE Consulting for the Village of Palmetto Bay,
Palmetto Bay, FL
22. Year Completed
Professional Services Construction (if applicable)
2006 2009
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Villa e of Palmetto Ba Ed Silva 305-259-1324
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
WA provided multi-disciplined engineering and
architectural support services for the Village on a
variety of projects. These projects included con-
struction costs ranging from $500,000 per task to
$1,000,000.
. Preparation of studies and reports
. Planning, design of building additions and
improvements
. Upgrading of engineering systems
. Site planning and improvements
. Preparation of construction documents
. Construction phase services.
The firm also provided architectural and engineer-
ing services to the Village for its new 9,000 SF
Library and Community Center as part of a Gen-
eral Consulting Contract with the Village. The li-
brary and Community Center will be utilized as a
meeting place within the community for a variety
of seminars and events. The Library which en-
compasses an area of approximately 5,000 SF.
Cost: $2,890,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME
a. WOLFBERG ALVAREZ & PARTNERS
Wolfberg Alvarez and Partners
(2) FIRM LOCATION
Coral Gables, FL
(3) ROLE
Prime Consultant. Project man-
agement, architecture, me-
chanical, electrical and plumb-
ing, cost estimating, construc-
tion management
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects. if not specified
Complete section F for each project.)
20. Example Project Key
Number
2
21. TITLE AND LOCATION (City and State)
General Architectural and Engineering Consultant Contract for the
Village of Pinecrest, Pinecrest, FL
22. Year Completed
Professional Services Construction (if applicable)
2002 2004
a. PROJECT OWNER
Village of Pinecrest
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Evelyn Greer 305-854-8989
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
WA provided Programming, Planning, Architec-
tural and Engineering services for the new Pine-
crest Municipal Center, Village Hall and Police
Department as part of a General Consulting
Contract. The new facility is home to the Village
of Pinecrest's Village Hall and Police Depart-
ment. The Municipal Center serves as the Vil-
lage's seat of government and houses the Vil-
lage's Building and Zoning Department, as well
as their Police Station.
The Municipal Center is a three-story building
consisting of a two level parking garage with
space for approximately 50 vehicles on the
ground level and 50 police vehicles on a se-
cured second level. A 26,000 SF third level
houses the Village's Government offices, public
meeting spaces, building and zoning offices and
the police station with offices, command center
and holding cells. The building also serves as
the Village's Emergency Operations Center and
was designed to withstand Category Five hurri-
cane wind speeds. An emergency standby gen-
erator capable of providing emergency power
for three days of additional protection during
emergencies.
Cost: $4,000,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (3) ROLE
WOLFBERG ALVAREZ & PARTNERS Coral Gables, FL Prime Consultant. Project man-
agement, architecture. me-
chanical, electrical and plumb-
ing, cost estimating, construc-
tion management
a.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified
Complete section F for each project.)
20. Example Project Key
Number
3
21. TITLE AND LOCATION (City and State)
Florida International University Continuing Architectural Contract,
Miami, FL
22. Year Completed
Professional Services Construction (if applicable)
2009 2010
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Florida International University
b. POINT OF CONTACT NAME
Alberto Delgado
c. POINT OF CONTACT TELEPHONE NUMBER
305-348-4036
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
As part of its 2008-2009 architectural continuing services contract with the university, WA is providing
architecture and engineering services for the remodeling of the new 6,400 SF locker rooms in the US
Century Bank Arena including complete remodeling of the basketball locker rooms. Engineering ser-
vice included new plumbing, electrical and HVAC modifications.
The basketball locker rooms call for upgraded finishes and built-in furniture commensurate with the
heightened profile that has been established by the university.
Cost $527,000
a.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (3) ROLE
WOLFBERG ALVAREZ & PARTNERS Coral Gables, FL Prime Consultant. Project man-
agement, architecture, me-
chanical, electrical and plumb-
ing, cost estimating, construc-
tion management
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. Example Project Key
QUALIFICATIONS FOR THIS CONTRACT Number
(Present as many projects as requested by the agency, or 10 projects, if not specified 4
Complete section F for each project.)
21. TITLE AND LOCATION (City and State)
University of Miami Architectural and Engineering Continuing
Services Contract, Coral Gables, FL
22. Year Completed
Professional Services Construction (if applicable)
1985 1990
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
University of Miami
b. POINT OF CONTACT NAME
Vic Atherton
c. POINT OF CONTACT TELEPHONE NUMBER
305-284-2211
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
WA provided Facilities Planning, Building and
Systems Analysis, and AlEII Design for a variety
of educational, research, and support facilities at
all four campuses in Dade County, including:
Coral Gables Campus
- Improvements to Classroom Buildings;
- Modifications to Ashe Administrative Building
and Office Buildings;
- Alterations to the Merrick Building;
- Improvements to Office Buildings;
- Modifications to Cox Science Center;
- Additions to Main Library and Law Library;
- New Basketball Practice Gymnasium and Sup-
port Facilities;
- Improvements to Hecht Athletic Center;
- Interior Alterations and Interior Design of Student
Union and Cafeteria;
- Modification and Expansion of Main Computer
Center;
- Modifications to Health Center Annex;
- Interior Renovation and Interior Design of the
Alumni Office;
- Modifications to Mahoney Residence Hall;
- Renovation of the University Book Store;
- Renovation of the School of Music Facilities;
- Computerization of the University Master Plan to
facilitate future space planning;
- Site Improvements including drainage, road-
ways, parking lots, utilities.
Medical Center Campus
- Modifications to Medical Science Building includ-
ing Teaching Laboratories;
- Modifications to Computer Facilities;
- Modifications to Debbie Institute;
- Renovation of John Elliott Building;
- Modifications to the Bascom-Palmer Eye Insti-
tute;
- Modifications to the National Children's Cardiac
Hospital;
- Modifications to the McKnight Vision Center;
- Modifications to the Advance Therapeutics and
Clinical Research Center;
- Alterations to the Mailman Center.
Rosenstiel School of Marine and Atmospheric
Science Campus
- Design of Experimental Fish Hatchery; Altera-
tions to the Grosvenor Classroom and -
Administration Building;
- Alterations to Library;
- Improvements to Classroom Buildings;
- Expansion of Laboratories.
Cost: $22,000,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (3) ROLE
WOLFBERG ALVAREZ & PARTNERS Coral Gables, FL Prime Consultant. Project
management, architecture,
mechanical, electrical and
plumbing, cost estimating,
construction mana ement
a.
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency. or 10 projects, if not specified.
Complete section F for each project.)
20. Example Project Ke
Number
5
21. TITLE AND LOCATION (City and State)
Vizcaya Museum and Gardens Miscellaneous Continuing
Contract, Miami, FL
22. Year Completed
Professional Services Construction (if applicable)
2009 2010
a. PROJECT OWNER
Miami-Dade County
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Leigh Heinlein 305-860-8449
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
WA was commissioned by Miami-Dade
County to provide architectural and engineer-
ing services to the Historic Vizcaya Museum
and Gardens. The projects under this con- .
tract include architectural restorations, re-
roofing, re-painting, ADA enhancements,
Electrical Upgrades, Stormwater Discharge
Management System and new building con-
struction. In addition to the project scope WA
also is assisting in the bidding and permitting
phase of the project along with Construction
Administration services. The items to be in-
cluded in the scope of the project consist of
the following:
Emergency Generator Building and Elec-
trical Vault Improvements
Replace the existing roofing and insulation system on the emergency generator room and coordi-
nate the work with the other scope proposed for this building. Remove exterior paint, repair
stucco and repaint exterior of emergency generator building and electrical vault.
New Ticketing Pavilion
A new ticketing pavilion with staff restrooms including new entry design leading up to the main
house. Miscellaneous replacement repairs to individual architectural components throughout the
site replacement of gondola roofs, reconstruction of lighting lanterns, ornamental gutter and
downspout replacement hurricane mitigation improvements.
Site Improvements
Develop new catering set-up area
A new handicap ramp with architectural motifs of the existing main house
Costs: $100,000 to $2,000,000
a.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (3) ROLE
WOLFBERG ALVAREZ & PARTNERS Coral Gables, FL Prime Consultant. Project
management, architecture,
mechanical, electrical and
plumbing, cost estimating,
construction mana ement
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects. if not specified.
Complete section F for each project.)
21. TITLE AND LOCATION (City and State)
Suniland Park Improvements, Village of Pinecrest, FL
22. Year Completed
Professional Services Construction (if applicable)
2002 2003
a. PROJECT OWNER
Village of Pinecrest
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Evelyn Greer 305-854-8989
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
Wolfberg Alvarez & Partners provided Architecture and Engineering services for the improvements to
the existing park, which involved the demolition of existing buildings and the construction of a new
Community Center, housing a multipurpose assembly room, concessions area, administration offices,
and restroom facilities. Additional park improvements included the addition of a Gazebo, enhance-
ments to the basketball courts and athletic fields, a new jogging/walking path, lighting upgrades, drain-
age improvements, new perimeter park fencing and a new park entrance drive.
Cost: $3,000,000
a.
(1) FIRM NAME
Wolfberg Alvarez & Partners
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(2) FIRM LOCATION
Coral Gables, FL
(3) ROLE
Prime
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects. if not specified.
Complete section F for each project.)
20. Example Project
Key Number
7
21. TITLE AND LOCATION (City and State)
GSA AlE IDIQ Consulting Contracts for Renovations, Alterations
and repairs to Federal Buildings including Post Offices, Court-
houses, Marshall Offices and IRS in Florida, Georgia & North
Carolina
22. Year Completed
Professional Services Construction (if applicable)
1987-1990,1991- 1987-1990,1991-1994,
1994, 1995-1998 1995-1998
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
U.S. General Services Administration,
Region 4 Atlanta, Georgia
b. POINT OF CONTACT NAME
William J. Lau, Architect
c. POINT OF CONTACT TELEPHONE NUMBER
404-331-1116
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
WA completed architectural, MEP engineering, planning and interior design services for three (3) sepa-
rate four year consulting contracts involving investigations, preparations of reports, design, as well as
construction administration services including:
. Improvements to U.S. Department of Labor Computer Operations U.S. Post Office and Courthouse,
Jacksonville, FL
. New Courtrooms and U.S. Marshal Facilities U.S. Post Office, Courthouse, and Customhouse Key
West, FL
. New Fire Protection System Federal Office Building Orlando, Florida
. Interior and Exterior Improvements U.S. Post Office, Courthouse and Customhouse Key West, FL
. Structural Study for Entrance Military Processing Center Tampa, Florida
. Electrical Overload Study U.S. Post Office and Courthouse Miami, Florida
. Roof Replacement U.S. Post Office and Courthouse Miami, Florida
. Lighting Study Richard B. Russell Federal Building and Courthouse Atlanta, Georgia
. Computer Room Expansion and security, Internal Revenue Service Center Atlanta, Georgia
. Uninterrupted Power Supply Internal Revenue Service Center Atlanta, Georgia
. Renovation and Modifications to Courtrooms Federal Building and Courthouse Winston-Salem,
North Carolina
. Space Renovation of Social Security Administration U.S. Federal Building and Courthouse Ashe-
ville, NC
. Improvements to the U.S. Marshal's Area U.S. Federal Building and Courthouse Asheville, North
Carolina
. Concept Development for a new FSS Warehouse Palmetto, Georgia
. Interior Improvements to the U.S. Coast Guard Communications Operations Brickell Plaza Miami,
Florida
. Interior Improvements to U.S. Marshal Service Facilities U.S. Post Office and Federal Building Mi-
ami, Florida
. Improvements to the Social Security Administration Offices U.S. Post Office & Courthouse Greens-
bro,NC
Cost: Various Tasks orders ranging from $100,000 to $2,000,000.
a.
(1) FIRM NAME
WOLFBERG ALVAREZ & PARTNERS
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(2) FIRM LOCATION (3) ROLE
Coral Gables, FL Prime Consultant. Project
management, architecture,
mechanical, electrical and
plumbing, cost estimating,
construction manaqement
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete section F for each project.)
20. Example Project
Key Number
8
21. TITLE AND LOCATION (City and State)
Project Consultant for Additions & Improvements, Miami-Dade
County Public Schools, Miami, FL
22. Year Completed
Professional Services I Construction (if applicable)
1995-2000 1995-2000
a. PROJECT OWNER
Miami Dade County Public Schools
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Carlos Havia 305-995-4742
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
The performance of this Contract has involved more than 165 separate projects requiring a
working knowledge of:
. School Board and DOE Administrative and Technical Requirements
. State Board Rule 6A-2 and other applicable Codes
. Educational Specifications including Facilities Lists
. DCPS Design Criteria
. Various DCPS Procedural Manuals
. DCPS and AlA Master Specifications
Complete Engineering, Architecture plus Interior Design services for investigations of facilities and
MEP systems, design, construction administration and related consulting services for projects of
new construction, modifications and additions. These have included:
. Roof replacement for more than 70 schools
. Programming & Planning
. Preparation of Florida Inventory of School Houses (FISH)
. AlEII Design of new construction renovations and additions
. Roof Replacement for more than 50 schools
. Central Automated Energy Management Control Systems
. Research and Recommendations for Pilot Program for reduction of electrical loads through
Value Engineering
. Preparation of DOE FLEET Submittals
. Preparation of As-Built Drawings
. Site Improvements including Paving, Drainage and Walks
. Construction Administration
. Project Closeout
Cost: Various Tasks orders ranging from $100,000 to $2,000,000.
a.
(1) FIRM NAME
WOLFBERG ALVAREZ & PARTNERS
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(2) FIRM LOCATION
Coral Gables, FL
(3) ROLE
Prime Consultant. Project
management, architecture,
mechanical, electrical and
plumbing, cost estimating,
construction management
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20 E I P . t
. xamp e roJec
QUALIFICATIONS FOR THIS CONTRACT Key Number
(Present as many projects as requested by the agency. or 10 projects. if not specified. 9
Complete section F for each project.)
21. TITLE AND LOCATION (City and State)
Flamingo Park Master Plan and Tennis Center Expansion,
Miami Beach, FL
22. Year Completed
Professional Services Construction (if applicable)
2008 2010
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Miami Beach
b. POINT OF CONTACT NAME
Mario Gonzalez-Pola
c. POINT OF CONTACT TELEPHONE NUMBER
786-295-8001
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
WA has been commissioned to provide a park wide
master plan and a new approximately 7,000 SF
tennis center for the City of Miami Beach at historic
Flamingo Park. The firm is providing programming,
planning, historical renovations, architectural and
engineering services for the 33 acre site.
WA conducted design charrettes with the citizens of
Miami Beach to solicit input on the new master plan
and tennis center. The new tennis center will have a
proshop, restrooms and a general multi-purpose
room. The master plan combines existing elements
to remain as well as proposed new structures and
activities areas and provides for park wide
improvements to landscaping, lighting, graphics and
signage, estate fencing, amenities such as benches
and garbage bins and improvements to other venues
including football stadium, baseball and softball
fields, public restrooms etc.
Cost: $4,900,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (3) ROLE
WOLFBERG ALVAREZ & PARTNERS Coral Gables, FL Prime Consultant, Project
management, architecture,
mechanical, electrical, civil
and plumbing, cost estimat-
ing, construction administra-
tion
(1) FIRM NAME (2) FIRM LOCATION (3) ROLE
a.
b.
c. (1) FIRM NAME
Wolfberg Alvarez and Partners
(2) FIRM LOCATION
(3) ROLE
STANDARD FORM 330 (1/2004)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency. or 10 projects, if not specified.
Complete section F for each project.)
21. TITLE AND LOCATION (City and State)
City of Miami Consulting Architectural and Engineering Services
Contract, Miami, FL
20. Example Project
Key Number
10
22. Year Completed
Professional Services Construction (if applicable)
2009 2010
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER
City of Miami Jose L. Puentes, AlA 305-416-1275
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost)
WA is currently completely projects under the City's miscellaneous NE contact and includes the
following projects.
9th Street Gallery
Renovations and remodeling for the gallery are to
include MEP upgrades, a new mezzanine and
stairs. Interior requires new concreate slab, ceiling
system, HVAC. Scope of work includes a new
roofing system as well.
Henderson Park
New office building with storage, new outdoor
pavilion, site improvements, sports lighting and
security fencing.
Virrick Park Pool Building
Upgrading MEP systems and revising construction
documents for the remodeling of the pool bathhouse.
Morningside Park Pool Improvements
Upgrading MEP systems and revising construction documents. Remodeling to include bringing the
facility up code ADA guidelines.
Bryan Park Tennis Center
Scope includes demolition of existing building, construction of a new recreation building and new tennis
courts and lighting
Cost: Various Tasks orders ranging from $100,000 to $2,000,000.
a.
(1) FIRM NAME
WOLFBERG ALVAREZ & PARTNERS
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(2) FIRM LOCATION
Coral Gables, FL
Wolfberg Alvarez and Partners
(3) ROLE
Prime Consultant. Project
management, architecture,
mechanical, electrical and
plumbing, cost estimating,
construction mana ement
STANDARD FORM 330 (1/2004)
G. KEY PERSONNEL IN EXAMPLE PROJECTS
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" Section below before
completing table. Place "X" under project key num-
26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT ber for participation in same or similar role)
(From Section E. Block 12) (From Section E. Block 13)
1 2 3 4 5 6 7 8 9 10
Marcel Morlote, AlA Project Manager X X X X X X X X X X
Aris Garcia, AlA Lead Designer X X X X X X X X X X
Raul Estevez Quality Control X X X X X X X X X X
Rafael Labrada, AlA, LEED AP Project Architect X X X X X X X
Aida Sanchez-Gomez, AlA, Project Architect X X X X X
LEED AP
Rafael Guissarri, AlA, LEED AP Project Architect X X X X X X
Eric Slay, LEED AP Technical Support X X X
Gustavo Alberti Arch itectu re X X X X
29. EXAMPLES PROJECTS KEY
NO. TITLE OF PROEJCT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 Village of Palmetto Bay Library and Commu- 6 Suniland Park Improvements
nity Center
2 General AlE Consultant Contract for Village 7 GSA AlE IDIQ Consulting Contracts for Renovations,
of Pinecrest and Repairs to Federal Buildings in Florida, Georgia
and North Carolina
3 Florida International University Continuing 8 Project Consultant for Additions and Improvements for
Architectural Contract Miami-Dade County Public Schools
4 University of Miami Architectural and Engi- 9 Flamingo Park Master Plan and Tennis Center
neering Continuing Contract Expansion
5 Miami-Dade County Vizcaya Museum and 10 City of Miami General AlE IDIQ Consulting Contract
Gardens Miscellaneous Continuing Contract
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS
NEEDED.
FIRM OVERVIEW
WA is recognized as a leader in South Florida for outstanding achievement and performance. The firm
offers a multi-disciplined staff which includes Architects, Mechanical, Electrical, Plumbing and Civil
Engineers, Interior Designers, Construction Inspectors, Cost Estimators and support personnel. With
responsibility for Architecture, Engineering, Interior Design and Construction Management, the WA Team
offers a unique combination of capabilities and expertise for this contract.
. Relevant experience governmental agencies throughout Miami-Dade, Broward and Palm Beach
Counties
. Extensive experience in the planning and design of municipal facilities in South Florida and a
comprehensive, working knowledge of the Florida Building Code - Dade County edition, as well as
FEMA requirements, life safety issues, provisions for the handicapped and all other applicable codes
as they apply to this project
. Over three decades of experience with governmental agencies, most recently as consultants to local
towns and villages
. An organizational structure which ensures an immediate response to all contract demands and
leadership in resolving conflicts and problems
. The depth of professional and technical resources to assign additional personnel, as required, to
meet unusual demands or perform specialized tasks
DEMONSTRATED ABILITY
WA has demonstrated the ability to provide quality projects in various South Florida communities, and in
doing so has developed a close, working relationships. In addition, while executing these projects we
have listened to the voice of the communities which has given us a clear understanding of the goals to be
achieved and in turn makes us especially qualified for this project.
INTEGRATED ARCHITECTURAL, ENGINEERING & INTERIOR DESIGN TEAM
With in-house capabilities in Architecture, Mechanical, Electrical, Civil and Plumbing disciplines, and
interior design, the firm has met its commitments with an exceptional balance between architectural
creativity and sound engineering. Our staff consists of enthusiastic professional, technical and support
personnel. Project teams are structured for optimum communication between clients and designers.
Quality, cost and schedule control are paramount throughout the duration of a project. WA has extensive
experience executing contracts for government agencies on the local, state and federal levels.
The firm is well versed in the preparation of plans, specifications, cost estimates, related studies, all
associated engineering services, shop drawing review, as-built drawing preparation, as-built annotations
on contract drawings as received from construction contractors, engineering investigations of existing
field conditions, construction inspection and engineering consultation services during construction. The
firm understands that the successful design of community centers must respond to the requirements of
security, public and private circulation, space needs and adaptability to modern technology. We have
resolved these issues successfully in many governmental projects.
LOCATION OF EXISTING OFFICE
WA is located at 1500 San Remo Avenue, Suite 300, Coral Gables, Florida, 33146. This central location
affords immediate access to locations throughout the county and assures a prompt response to meetings
with Monroe County.
31. SIGNATURE:
33. NAME AND TITLE: Marc I Morlote,AIA, Sr. Vice President
I. . AUTHORIZED REPRESENTATIVE
is a'statement of facts
32. DATE: May 26.2010
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
1, SOLICITATION NLIWlER (if any)
ARCHITECT-ENGINEER QUALIFICATIONS
RFQ 2009-13
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED It DUNS NLIWlER
WOLFBERG ALVAREZ & PARTNERS 1976 031509102
2b. STREET 5. OWNERSHIP
1500 San Remo Avenue, Suite 300 a. TYPE
2c. CITY I~d. STATE 2e. ZIP CODE Corporation
33146 b. SMALL BUSINESS STATUS
Coral Gables FL
6a. POINT OF CONTACT NAME AND TITLE No
7. NAME OF FIRM (if block 20 is 0 branch office)
Marcel R. Morlote, AlA, Sr. Vice President
6b. TELEPHONE NUMBER I;c. E.MAIL ADDRESS Not Applicable
305-666-5474 mmorlote@wolfberaalvarez.com
8a. FORMER FIRM NAME S) 'it anv) 8b. YR. ESTABLISHED 18c. DUNS NUMBER
N/A I
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue Index
Code b. Discipline Code b. Experience Number
(1) FIRM (2) BRANCH (see be/owl
02 Administrative 6 A06 Airports, Terminals 8: Hangers, Freight Handling 7
06 Architects B H09 Hospital and Medical Facilities 8
08 CADD Technician 8 C08 Codes, Standards, Ordinances 6
12 Civil Engineer 3 C10 Commercial Building (Low Rise); Shopping Centers 7
15 Construction Inspector 1 C12 Communications Systems; TY; Microwave 4
16 Construction Manager 2 C15 Construction Management 6
18 Cost Engineer/Estimator 1 C18 Cost Estimating; Cost Engineering 8: Analysis; Pararr 4
8: Forecastin2
21 Electrical Engineer 3 E02 Educational Facilities; Classrooms 6
37 Interior Designer 2 E07 Energy Conservation; New Energy Sources 4
42 Mechanical Engineer 5 G01 Garages; Vehicles Maintenance Facilities; Parking D 7
48 Project Manager 4 H11 Housing (Residential. Multi-family, Apartments, 6
Condominiums)
57 Structural Engineer 1 101 Interior Design, Space Planning 6
61 Value Engineer 1 P07 Plumbing and Piping Design 6
P08 Prisons and Correctional Facilities 6
R03 Railroad; Rapid Transit 6
R04 Recreation Facilities (Parks, Marinas, Etc.) 5
S08 Special Environments; Clean Rooms, Etc. 4
Other Emplovees 0 0
Total 45 0
11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100,000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 6 3. $250,000 to less than $500,000 8. $ 10 million to less than $25 million
b. Non-Federal Work 7 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
c. Total Work 7 5. $1 million to less than $2 million 10, $50 million or greater
PART II - GENERAL QUALIFICATIONS
(If a firm has brtrlch offices, complete for each specific brtrlch office seeking work.)
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE /1
1+1"
\
il
b. DATE
May 26, 2010
Julio E. Alvarez, PE, President
STANDARD FORM 330 (112004) PAGE
Wolfberg Alvarez and Partners
STANDARD FORM 330 (1/2004)
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted to City of Sunny Isles Beach
by Wolfberg Alvarez & Partners
fur Professional Architectural Services
whose business address is 1500 San Remo Ave., Coral Gables, FL 33146
and (if applicable) its Federal Employer Identification Number (FEIN) is 59 -1 713092
(IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:
2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. 1 understand that "convicted" or "conviction" as defined in Paragraph 287 . 133 (1)(b ), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or
entry of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287. 133 (1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States
with the legal power to enter into a binding contract and which bids or applies to bid on
contracts for the provision of goods or services let by a public entity, or which otherwise
transacts or applies to transact business with a public entity. The term "person" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (1) of the
following three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management ofthe entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the
State of Florida, Division of Administrative Hearings and the Final Order by the Hearing
Officer determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD
AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE
CATEG RY TWO ANY CHANGE IN THE INFORMATION CONTAINED IN THIS
FO
Julio E. Alvarez, PE
(Printed or Typed Legal Name of Affiant)
State of Florida Co nty of Miami-Dade
Sworn to and subscribed before me this 20th day of May
,2010 by
Julio E. Alvarez, PE
Odalis Vidal l&dt~ ddal
Notary's Name Printed, Stamped or Typed
Notary Seal:
Personally Known: X
or Produced Identification
......" 11.11.. II II.... II...... II........... I.
: ODALlS VIDAL :
- .
i ~\~~I;/l"'", Comm# 000813114 :
. ""<:)tI~ .
: t~ ,.J F'l(Dire~ 8/1012012 :
: ~'~ ~.; :
: ~"''''I,OFr~,\,.;:- Prv"ida "10tary Assn., Inc :
. 1mu' .
~""I'" 'tllIl$""''' ~..~...,,. ""..~.... ..".. ~..,.".,........
Identification Produced
NON-COLLUSIVE AFFIDA VIT
State of Florida)
County of Miami - Dade)
Julio E. Alvarez, PE
and says that:
being first duly sworn, deposes
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage
against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, co spiracy, connivance, or unlawful agreement on the part of the Bidder or any
other 'ts ge s, ,repr entatives, owners, employees or parties in interest, including this
Affi nt.
Julio E. Alvarez, PE
(Printed or Typed Legal Name of Affiant)
ounty of Miami-Dade
Sworn to and subscribed before me this 20th day of May
,2010by
Julio E. Alvarez, PE
OOn] i s vi onl IdtJd; !lldJ
Notary's Name Printed, Stamped or Typed
Notary Seal:
Personally Known: X
or Produced Identification
II II.... I'" ........ I' II I' II .... II II "'1'" II.
ODALlS VIDAL ::
",~~~'t/J:",> Comm# 000813114 E
~<:)m+;;- .
(;~4 Expires 8/10/2012 E
~"~Of;'~'" Florida Notary Assn., Inc :
_It. <: ,,':'!~1~'.1II"'" ,It 1 "" "."11111' ..................;
Identification Produced