HomeMy WebLinkAboutMetric Engineering
May 26, 2010
Ms. Jane A. Hines, CMC
City Clerk
City Clerk's Office
Sunny Isles Beach Government Center
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
RE: Professional Engineering Services
RFQ NO.1 0-04-01
Dear Ms. Hines:
Metric Engineering, Inc. (MEI) in association with Geosol, Inc.
(GI), Manuel G. Vera & Associates, Inc. (MGV) and Rosenberg
Gardner Design (RGD) is pleased to submit this Request for
Qualifications to provide Professional Engineering Services for the
City of Sunny Isles Beach.
Mr. Enrique Antelo will be the Project Manager for this very
important assignment. Mr. Antelo's credentials include over 36
years of experience in civil and transportation projects in the Miami-
Dade Metropolitan area. His technical experience includes all
aspects of urban as well as rural highway design including drainage,
lighting, signals and utility coordination. He has a proven track
record of successfully managing projects of various sizes and
complexity from simple milling and resurfacing projects to urban
reconstruction and limited access facilities. His most recent
experience as Project Manager includes the Busway in South Dade
for MDT. This project involved extensive coordination between
various stakeholders such as Miami-Dade Transit, Miami-Dade
Public Works Department, Florida Department of Transportation and
multiple sub consultants to deliver inter-related construction contract
documents on schedule. His contact information is: 13940 SW 136
St., Miami, FL 33186; phone: 305-235-5098; fax: 305-251-5894.
RECElVED
MAY 2fYl~~~~~
":ITY OF SUNNY ISLES BEACH
OFFIC~ OF THE CITY CLERK
Services to be provided:
· Survey
· Geotechnical
· Structural
· Landscape Architecture
· Traffic
· Construction Management
· Construction Inspection
· Construction Testing
· Hurricane Recovery and Debris
Monitoring Services
· General Design Work
· Preparation of Complete
Construction Plans & Special
Provisions for the Assigned
Project
· Public Involvement
· Post Design Services (Shop
Drawings and Responses to
Request for Information)
· Bid Administration
We look forward to your favorable consideration and opportunity to serve the City of Sunny Isles
Beach.
Sincerely,
Metric Engineering, Inc.
R~ares, P.E.
Vi~~~~ent
RUvg
Page 1
Following is a summary of our services:
CIVIL ENGINEERING
· Streets & Highway Design
· Structural Design
· Traffic Operations Design
. Master Planning
· Site Engineering
. Municipal Engineering
. Slle Development Plans
. Pavement Marking & Sign age Design
. Street Lighting Design
. Grading & Drainage Design
. Water & Sewer Design & Permitting
· Pump Station Design & Permitting
· Hydrological Studies
· Water Management Design & Permitting
. Cost Estimating
· Earthwork Calculations
. Floodplain Analysis
· Environmental Analysis
. Engineering Reports & Evaluations
. Contract Administration
. Plans Review
TRANSPORTATION
ENGINEERING
& PLANNING
· Traffic Impact Analysis
· Traffic Operation Analysis & Design
· Arterial Intersection Operation Analysis
· Highway Planning & Design
· Master Planning
· Conceptual Design & Alternates Analysis
. Transportation Control Measures Evaluation
· Site Evaluation/Due Diligence Analysis
. Traffic Signal & Street Light Design
· Intersection/Interchange Planning & Design
. Highway Rlght.of-Way Mapping
· Access Management Evaluation
. Corridor Planning Analysis
· Pedestrian/Bicycle Pathways
. Regional Modeling
. Neighborhood Traffic Control
· Parking Studies
CONSTRUCTION
ENGINEERING
& INSPECTION (CEI)
· Contract Management
. Quality Control Management
· Design/Build Project Delivery
. Scheduling
· Cost Estimating
· Claims Analysis & Management
· Testing Services
· Constructablllty Review
. Construction Monitoring
· Construction Management Services
· Storm Recovery Management
· Transit Systems
· FOOT Procedure Expertise
ENVIRON MENTAL
ANAL YSIS
& DOCUMENTATION
· CategorIcal Exclusions, Environmental
Assessments & EIS Documents
· Air Quality Analysis & Reports
· Noise Analysis & Reports
· Wetland Delineation & Reports
· Contamination Screening Reports
. Biological Species
· Permit Coordination
· NPDES Compliance
· Conceptual MItigation
INTELLIGENT
TRANSPORTATION
SYSTEMS (ITS)
. Systems Design
· Advance Traffic Management Systems
· ITS Polley and Planning
. Systems Management & Integration
· Telecommunications Planning & Design
. Construction Management
· Traffic Signal Control
· Extremeware CLI Switch Layer 21Layer 3
Management and Configuration
· Extremeware's EPICenter Management
. NTS-200c Network Troubleshooting
· Fiber Optic Cable Instal/atlon Management
PLANNING
. Project Development
and Environment (PD&E) Studies
. Preliminary/Final Engineering Reports
. Access Management Reports
· Traffic Analysis & Data Collection
. Corridor Analysis Reports
· Hydrologic/Drainage Reports
· Interchange Modification/
Juslificatlon Reports
. Site Planning Design & Processing
· Comprehensive Planning
. Development of Regional
Impact Studies
· Community Planning
. Land Planning
· Development Plans Review
. Plat Preparation & Processing
· Concurrency Studies
· Due Diligence Studies
GEOGRAPHIC
INFORMA TION
SYSTEMS (GIS)
· Web.Based GIS Service (GISLlte)
. Desktop and Mobile Service
· Consulting DeSign & Implementation
· GIS/GPS Database Design
· Feasibility & Implementation Studies
· Map Production
· environmental Modeling
· Wetland Delineation & Modeling
EMERGENCY MANAGEMENT
SERVICES
· Debris Monitoring & Inspection
. Disaster Recovery Planning
· Damage Assessment
. Automated Debris Management Solutlon™
. Hazardous Site Remedlalion
· Canal Dredging
. Contractor Payment Processing
. Documentation for FEMAlFHWA
· Mobile Command & Control Center
Page 2
Metric Engineering was
established 34 years ago, as
a local minority owned
engineering firm specializing
in Civil Engineering and Land
Surveying. Today, we are a
firm of over 250 employees
throughout the State of
Florida and ranked number
50 in the nation by ENR for
construction management
and 291 for design. Metric
continues to specialize in
municipal engineering,
transportation engineering,
and land development. We
have worked with several
state and local agencies
such as the City of Sunny
Isles Beach, City of Miami,
City of Homestead, City of
Riviera Beach, Palm Beach County, Village of Islands, Florida Department of Transportation, Miami-Dade
County, Palm Beach County, City of Boca Raton, Town of Palm Beach, Miami-Dade Transit Agency, and
the City of Delray Beach on several occasions.
iVJ ETJX.1C :ENGIi'lEiERJi'1,[3, I i'1 C"
'JVIIY -n liNGS 'J'/I:J1..!KCI
~
:;r... ... II'N 11;. "VKNUII'
~"'N"''''''' C.TY,...... ':II:;r...g.
~HONII:, ..g_.'7::1..g......
aCl;~::;':L ;...:~:':~
......TII' ':11'1;1
W".T ~"''''I-l .C...CH,,..... ':1':1'" 1 .
"H!;INK' .., .....g_, :lg.
G""'''''''
."~O
'1\.. .~1
~~'"
~~
J )-:.~.t.~g
o$"';.~~
~~"'~~
':.....1;1........':0.....1'..1'.:11''1'
'."A'."."l. :>:0,....
"'.0"1'.:;, :'O~.~:2~'~O~1l
""""-U
1 =.. C:"'U"C:'" ...VCN....C
CH''''''CY,'''''' ':12..2.
~HONII:. ..0-.':1..':1':1.':1
,... C"C.CII;NT II;>IO;:C....T'Vt: co...."...
eU.TII: .a..
........., ......"Y....... ':12'7....
'...g'7' ........, ...
.g. N. ......"'11: OKaT'NY O",vK
.....,'1'11: ':II".
................NO....... ':I:z....
"...ONI:. ..g.....o......:zo
r;:();l
~~.II.V'
WWW.MI!!:TRICI!!:NI3.CDM
..0
Although we are considered a large engineering firm, our responsiveness to our clients is handled as if
we were a small firm. It is this experience and level of commitment that we would like to offer the City of
Sunny Isles Beach.
Ownership of Company
Name Title Address
VMB Investments, Ltd ------- 13940 SW 136 St., Miami, FL 33186
Carlos Duart, CPA President 13940 SW 136 St., Miami, FL 33186
Metric Engineering, Inc. is in good financial standing, below is Metric's Gross Revenues for the past 2
years: FYE 2008 $36,965,423, FYE 2007 $35,284,444
Our mission is to provide our clients with the personal service and attention they would receive from a
smaller firm, while delivering the experience and resources of a national firm.
As a full service transportation engineering firm, we have the capabilities in-house to perform all the
requisite engineering tasks to take a project from paper to pavement. At the planning phase we perform
Transportation Statistics Studies, Travel Demand Forecasting, Land Use evaluations and comprehensive
plan amendment reviews. In addition, we can take this information and advance the project into the
Project Development and Environment phase where we perform more detailed studies to ensure we have
a permitable and constructable project before it advances into the final design stage. By understanding
the genesis of the project, we can deliver roadway and civil final design plans that are comprehensive in
nature, and are sensitive to the work performed during previous project phases to arrive to that point. We
have civil design expertise throughout the state of Florida and in particular in South Florida where we
have had a number of municipal repeat clients such as City of Miami and City of Homestead. Once the
design is completed, we have the expertise and experience in performing post-design services such as
responding and documenting RFI's, Criteria Package preparation and construction oversight as well.
Besides our extensive roadway and bridge design qualifications, ENR (Engineering News-Record) ranked
Metric 50th among the Top 100 Construction Management Firms in the entire country. Our growth from
No. 53 was made possible by the outstanding quality and commitment of our CEI staff of over 200
Page 3
Metric Engineering has been providing emergency debris removal services since Hurricane Andrew in
1992. During the 2004 and 2005 record storm season, Metric managed over $100 million dollars in
emergency debris removal contracts for the Florida Department of Transportation that included extensive
coordination with FHWA, FEMA and various local governments. Because of this experience, we
understand first-hand the critical issues to clearing and removing debris in a quick and efficient manner,
ensuring public safety, and restoring normalcy to the citizens of the City of Sunny Isles Beach, while
adhering to federal guidelines to ensure maximum reimbursement from participating federal agencies.
Over 100 of our employees have significant and recent hurricane debris removal experience and our well
qualified and responsive subconsultants add to the available staff.
Desiqn Philo::.ophv and Pro(.e~s
Our Design Philosophy is based on the principle of always keeping the ultimate goal of our client at the
forefront of all design related decisions. This philosophy is achieved by following these basic steps:
. Understanding the local landscape
. Determining the project's effect on the region
· The implementation of sustainable design elements, and
· Establishing independent Peer Reviews to ensure a quality product.
The process in implementing this philosophy starts with a clear understanding of the City's needs and a
clear vision of its landscape. The process in implementing this philosophy starts with a clear
understanding of the City's needs and a clear vision of its landscape. The City of Sunny Isles Beach
Comprehensive Plan which was adopted October 2000, serves as the initial source of information.
According to the report, the city is expecting over the course of the years a significant growth in dwellings
resulting in an additional strain on the City's infrastructure. The resulting effect on the City has been an
increase demand to upgrade storm water systems, as well as water and sewer systems and to evaluate
the role of transit and roadway oriented development. An understanding of these issues is critical to our
design approach.
Once you have a clear understanding of the needs and issues and the project's role at a regional level,
you can move forward in implementing a sustainable design. As the region and City's population
continues to expand, there will be a growing challenge on how to minimize impacts to the natural and
social environment to ensure that a high level quality of life is maintained for its visitors and residents. As
a company we take this matter very seriously. Our corporate offices as well as the majority of our
employees live and work in Miami-Dade County area. By providing this type of focus in our design it will
lay the groundwork for sustainable development that is resource sensitive and results in a positive effect
not only to the natural environment but to the City of Sunny Isles Beach neighborhoods (community
cohesion) both present and future.
Once we develop our design the next phase is ensuring that the City receives a product of the highest
quality. Built into every project is a Quality Control/Quality Assurance program built on the principle of
independent peer reviews. A detailed explanation of this process is explained under the Technical
Capabilities section of this proposal. This process not only checks for errors and omissions, but also
checks that all of the design principles that were previously outlined were considered in the development
of the plans.
CADD & c,ortwar
At Metric, we maintain state-of-the art equipment and the skills necessary to derive full benefits from its
capabilities. These assets will be used to provide valuable assistance in perform ing the engineering
tasks as well as the preparation of any reports and documents. In addition to this specialized equipment,
we provide continuous training to our technical and support staff to ensure they are up to date on current
technology use and applications.
Page 4
Tr ill HCS, Signal97, Synchro, Transit-7F, Netsym, SIDRA, TSIS, Petra, Peek, AAP, CUBE,
VOYAGER, CORSIM.
Other Microsoft Office 2007, PowerPoint, Adobe Illustrator CS2, Corel Draw, Corel Photo Paint,
Primavera, Adobe Acrobat.
Spel/ill/zed Hardwar - Over 20 Dell Precision T3500, Quad Core Intel@ Xeon@ W3540 2.93GHz, 8M L3,
4.8GT/s Turbo / 6GM Memory / 500 GB Hardisk / 768MB Nvidia Quadro FX 1800 Graphics Card / Windows XP 64bit
/ 16X DVD+/-RW ROM, 5 color laser printers, 3 color copier, two HP 1050 Color Plotter, laptops, portable
video projectors, digital cameras with 7.1 dpi resolution, GPS Survey Equipment and vacuum and radar
locators for underground utility location
We are fully capable of providing in-house publishing with our 3 new Ricoh Africio Copiers and
specialized software such as ADOBE Photoshop, Acrobat, Framemaker and PageMaker. This helps us
prepare brochures, maps, and any other graphics on virtually any type of paper, giving us much more
flexibility than if this were outsourced.
Quality Control and As:.,urance
Quality Control Plan A key aspect to any successful project is a successful and well-implemented
quality control plan. MEI has developed a quality control approach that can be tailored to the specific
needs and requirements of each client. It should be noted that reviews by experienced and independent
personnel are built into every Quality Control Plan ensuring that comments are meaningful and
constructive. All of our subconsultants are required to submit a Quality Control Plan (QCP) that must be
approved by MEl's Project Manager prior to the commencement of the work.
The Quality Control Plan (QCP) for these specific projects will initially be prepared by MEI and submitted
to the City's Project Manager within 10 working days of NTP. Within this plan we will identify the
independent review team that will be conducting the QC reviews at various stages of the project's life.
Once the City's Project Manager approves the QCP, the independent review team will be part of the
overall design team.
They will receive copies of all design notes, reports and drawings along with quality control sets of
drawings at each phase submittal.
Metric Engineering is committed to supporting the City of Sunny Isles Beach's professional staff in the
successful execution and completion of this contract. With this team of quality and seasoned engineers
and technicians, managers and state of the art equipment we firmly believe we offer you the best team for
this contract.
Fiigure 1 illustrates our Quality Control Process.
QUALITY CONTROL PROCESS
_+~ii~,'
-..-......... -........
.. ;.. . - . .. .. . ~
I .
":;-~- f'" " ;',.,' .' ."": .' :... : ..
... .
.. .
. .. .. . ...
. . ~ -. .
~
NOT ;.
APPROVED .... .
APPROVED
Page 5
Our proposed personnel to be assigned to this project is as follows:
~ . "c. .~
. 0 O' ,
!';"",~~N"':,_t:-"~:"i ':",,":~~_,;,,>'" -'.,_~
.
. . . .
-:,'
. " .
.
. . .
. . . .
. .
. . .
. . ' .
. .
., . .
. . . . .
. .
. . . . .
Robert Linares, P.E.(MEI) 12 . . . . . . .
Principal-in-Charge
Enrique Antelo (MEI) 36 . . . . . . .
PrQject Manager
Allan Segueira, PE (MEI) 10 . . . . . . .
Project Engineer
Fernando Larios (MEI) 25 . . .
Project Engineer
Sijong Jo, PhD (MEI) 13 .
Sr. Traffic Engineer
Raul Driggs,PhD,PE 43 . . . . .
Sr. Transportation Engineer
Edgar A. Munoz, PE (MEI) 10 . . .
Project Engineer
Ross Shillin.9ford, PE (MEI) 13 . . . . . .
Proiect Enalneer
Douglas Ruggiano, PE (MEI) 18 .
Structures
Antonio Piedra PE (MEI) 11 .
Construction Management/CEI -
Carlos Duart, Sr., PE (MEI) 25 . . . .
Roadway Engineer = = ~ I~---
- ~"~v_~~ '_~ . d ~., ~ ~ '-.-.-.-.-- ~ .. ~ . _.,~,- <-.---;,-,'.. -",.. ",-~.""
Oracio Riccobono, PE (GI) 25 .
_G_eote"chni~~I"""M" ,_, " d' - ~
Manuel. G. Vera, Jr.,PSM (MGV) 25 .
Surveymg
Kenneth Gardne~ AS LA, LEED AP 15 .
Landscape Archi ecture
Page 6
OmETRIC
~ ENGINEERING
WHY THINGS WORK
E=NRIQUE: ANT E:l 0
ProJe( t M HI ~ ~\ I
:;, )uth DadE' bllsV <lY Extension Segment II Miami Dade ~ I 1.ll
Project E:ngineel Construction of a 7.3 miles of roadway and bike path for
Miami-Dade Transit. Responsible for the design of all roadway signalization,
pavement marking, and drainage systems as well as plans and contract
document production and construction administration. The project design
involved intersection improvements, street lighting, signalization,
maintenance of traffic, and engineered mitigation of in-situ contaminated
soils within significant portions of the project corridor. (2001-2008)
45" Street I Haverhlll Road, Palm Beach County. Florida Dri>in iljt'
Engineer Roadway reconstruction and widening of 1.3 miles of urban
arterial between Jog Road and Haverhill Road. The project involves
widening the road to three lanes, a new intersection, milling and resurfacing,
drainage improvements, a new bridge crossing of Florida's Turnpike,
signalization, right of way acquisition, utility coordination, signing, and
pavement marking. Responsible for the design of signalization at two
intersaections an all pavement marking. (2006-2008)
"5R AlA South Roosevelt Boulevard, Key West FlOrida ~ ruj, t
Engineer Reconstruction of three miles of an urban arterial for FDOT
District 6. Responsible for roadway and drainage design, signalization,
lighting, plans and contract document production and construction
administration. Project involved complete reconstruction of seawall,
pavement, sidewalk, and drainage systems as well as significant project
permitting. Project is currently under construction and post-design services
are in progress. (2001-2008)
Washington Avenue Parking Lot, Homestead, Florida, Project Manager
Site development project for the City of Homestead Community
Redevelopment Agency to create a new one-acre, 68-space parking facility
in the Downtown Business District. Project involved site layout, paving,
drainage improvements, irrigation, landscaping, signing, lighting and post-
design services. (2006 - 2007)
Audoban Park, Homestead, Florida Project Manager - Site development
project for the City of Homestead Parks and Recreation Department to
construct improvements to the existing City park. Project included of a new
parking lot, site grading, multi-use path, lighting, and landscaping and post-
design services. (2006 - 2007)
Force Main Improvements, City of Dania Beach Florida ProJ<O'l t
Manager Construction of 2,300 linear feet of 16" sanitary sewer force main
under a joint project agreement between Dania Beach and FDOT. The
project involved fast-track design to upgrade and relocate existing sanitary
systems in advance of planned road improvements and to service local
redevelopment. The project also involved significant traffic control,
permitting, and post-design services. (2007-2008)
EDUCATION.
B.S. Engineering
Technology, Florida
International University,
1980
YEARS OF
EXPERIENCf
36years
PROFE:SSIONAL
EXPERIENCE:
Mr. Antelo has 37 years of
extensive experience in
the technical execution of
complex civil engineering
projects, particularly in the
areas of roadway
geometrics, lighting
drainage, land subdivision,
and maintenance of traffic.
OmETRIC
~ ENGINEERING
WHY THINGS WORI<
D()lh.~l A~ HlJl~( IANO, P E
Str u\. ttll dl [)t;3p,1r till, qt Manager
Mr. Ruggiano has been has been involved as a structural engineering in the design of the
following Metric Engineering projects: Homestead Busway Shelter, Central Florida ITS
(Sign Structure Project, OOCEA DMS Sign Structure, US-98 Box Culvert, Okeechobee
Toll Plaza Lane Conversion, 1-4 over Graves Avenue, NE 71st Street, SR-500, Palmetto
over Okeechobee Post Design, Brevard ITS, SR A1NSouth Roosevelt.
4, Strp I Hrll')f )t It Flonda Turnpike Palm Beiich ('ounty - The structure
consists of four curved and skewed spans (>30 degrees), 134'- 130' - 126' - 126' for an
overall length of 486' and total square footage of 62,000 sf, with seven Bulb-T72 girders
carrying each of the eastbound and westbound superstructures and supported by framed
piers on 18 in. sq. pre-stressed concrete piles. Performed the prestressed beam analysis
and CIP continuous superstructure deck calculations. Also checked the intermediate pier
and end bent design performed by others. 2005-2007
Grove IslE> Bndge l f)' level Bndge Rehabilitation Miami-Dade (,0 J "\ · I J"da
Project Manager Project involves the rehabilitation of a 28 span low-level bridge over
Biscayne. The rehabilitation consists of repairing prestressed/post tensioned deck/slab
units, cast-in-place-bent caps and prestressed piles. Project manager responsible for the
bridge inspection determination of deficiencies and implementation plan for bridge repair.
Also responsible for the development of contract plans, technical specification, quantity
computations and construction cost estimate.2006 - ongoing.
I 95 Over lake Washlllgloll Road Brevard County, FL - Project involves the widening
of bridge nos. 700123 (northbound) and 700040 (southbound) along 1-95 over Lake
Washington Road. The twin bridges are 4-span, AASHTO Type II girder bridges with CIP
continuous deck superstructure with an overall length of 172 feet. The cap/multi-column
bents are founded on 18" square prestressed piles. He was certifying Engineer of record
and performed the deck design and AASHTO Type II girder design as well as checked
the intermediate hammerhead piers founded on 4 -18" pre-cast piles. 2005
Inspection of Bridges and Sign Structures for MDX, Miami-Dade County Flonda
Project Manager Project involves routine bi-annual inspections of 120 bridges and 112
sign structures along SR-836, SR-874, SR-878, SR-924 and SR-112. Responsible for
project scheduling, reviewing inspection reports, and performing ONOC for the
inspections performed. 2003 - 2004.
East 79tl1 Street Bascl/lp dnd Low Level Bndge Rehabilitation Miami Dadf JUnty
Florida, Bridge Design Fngllleer Project involves the rehabilitation of four 17 span
low-level bridges and two bascule bridges. The rehabilitation consists of repairing pre-
stressed/post-tensioned deck/slab units, pre-stressed AASHTO girders, cast-in place
bent caps, bridge fender system, painting of structural steel on bascule leaves, repair
mechanical and electrical component associated with the bascule leaves and
replacement of steel maintenance platform. Responsible for the development of contract
plans, technical specification, quantity computations and construction cost estimate.
2003 - 2004.
Julia Tuttle (~l/SP 'N ~ Miami Dade County F-Ionda Bridqe DE I III JIll 'I
Project involves the rehabilitation of a high level 27 span prestressed AASHTO girder
type bridge structure over North Biscayne Bay. The scope of retrofit included repairs to
prestressed girders, steel pot bearings and concrete piers, as well as the replacement of
the existing fender system. The bulk of the project involved the repairs to the concrete
pile cap foundations where cathodic protection was implemented into the restoration to
ensure longevity of repair life. Responsible design engineer for the development of
contract plans, technical special provisions, quantity computations and construction cost
estimates. 2003 - 2004
E:.DUC AllON
B.S.C.E., Florida State
University, 1991
PROF-ESSIONAl
REGISTRATIONS
Florida P.E. #51497
( 1997)
YEARS OF
EXPERIENCE
18 years
'rfARS WITH MfTRll
5 years
PROFESSIONAL
EXPERIENCE
Doug has 18 years of
engineering design
experience as a
structural engineer. He
has design experience
with a variety of
structures, including the
design of conventional,
high level and movable
bridges. He has been
responsible for the
design and supervision
from preliminary design
phases through final
construction as well as
the production of
engineering reports on
numerous projects.
OFFICE LOCATION
Miami
SR-112 Toll Plaza Conversion. rvlldrm Odde County. Florida - Project consisted of three
primary elements: roadway, toll plaza, and employee parking area. The roadway portion
consisted of expanding the merging and diverging areas, correcting roadway cross slope,
drainage, signing & pavement markings, maintenance of traffic and roadway lighting. The
toll plaza portion consisted of the conversion of two dedicated Sun Pass lanes to express
Sun Pass lanes, removal of a automatic coin machine lane, and the conversion of a
automatic coin machine lane to a manual booth lane. The removal of the automatic coin
machine lane provided the needed space for the proposed express SunPass shoulders.
The existing high canopy was replaced with a gantry over the proposed express SunPass
lanes. The existing employee parking was reconfigured as part of the project.
MIC Earlington Heights Connector Site Civil Engineer for the Miami Illtfrmodal
Center Earlington Heights Station. The Miami Intermodal Center- Earlington Heights
projects runs from the existing Earlington Heights Station located next to SR-112 and
approximately east of NW 27th Avenue west to the new MIC Core Facility locate next to
the Miami International Airport. The project included the site civil design. Served as the
designer of record for the maintenance of traffic (including SR-112 & NW 41 st Street),
detour plans for the MIC-Earlington (crossing), Signing and Pavement Marking (including
SR-112 and NW 41 st Street), signalization design, temporary signal, and substation
design. Our site civil department, as part of the design team, has been involved in monthly
coordination meetings with Miami-Dade Transit Agency representatives,
architects/engineers and system consultants
., W 62 Avenue (SW2.Jrn';treet to NW [/1 Street) Miami' Dade Count~ tl Served as senior project engineer
for this project. Prepare a Contract Plans Set for the total reconstruction of a 2.0 mi segment of this urban corridor.
Including upgrading one signalized intersections from span-wire to mast-arm, implementation of a traffic safety study,
compliance with ADA requirements, drainage design, signing & pavement markings, maintenance of traffic and the
design of a new street lighting system.
OmETRIC
~ ENGINEERING
WHY THINGS WORK
ALLAN B SE:.QUllI~A P.E.
Project f nqlnE'E'r
NW 36 Stn.,.t (~R 9~~) ~[ I..JW 12'1 Avenue (SR 969) Grade Separation F- LJ fly
m Mii'lllll D,.jr County f) r DOT District 6 - The study focuses on providing a grade
separation at the intersection of NW 36th Street and NW nnd Avenue to relieve congestion
while retaining and integrating the local access and traffic movements. The proposed
improvement is to construct a NW 36th Street through movement overpass over NW 72nd
Avenue to enhance systemwide traffic operations in the area. This project will be
developed following the ETDM methodology. A preferred alternative will be recommended
on a review and analysis of all engineering, environmental, and public involvement issues
related to the project. Reports include Design Traffic Technical Memorandum, Preliminary
Engineering Report, Conceptual Design Roadway Plan Set, Drainage, Geotechnical and
Environmental reports.
City of Miami. Silver Bluff Traffic Calming Phase II (Project No. B 301 (j8B) dnd
Priority III (Project No B30168A), Design of Traffic Calming Devices The project
involved the modification of 10 existing intersections within the Silver Bluff Area of the City
of Miami with Traffic Calming Circles. The design included geometry re-alignment,
grading, minor drainage improvements to prevent creating any drainage issues, and
signalization to meet Miami-Dade County Public Works and City of Miami standards.
City of Miami Traffic Calmmg Grove Area, Project No. B.30037A DeSign -:IT Trdfflc
Calming Devices The project involved the modification of 4 existing intersections within
the Coconut Grove Area of the City of Miami with Traffic Calming Circles and Flat-Topped
Speed Hump. The design includes geometry re-alignment, grading, minor drainage
improvements to prevent creating any drainage issues, and signalization to meet Miami-
Dade County Public Works and City of Miami standards.
City of Miami, Flagami Traffic Calming Priority IV, Project No. B40672A Design of
Traffic Calming Devices The project involved the modification of existing intersections
within the City of Miami with Traffic Calming Circles. The design included geometry re-
alignment, grading, minor drainage improvements to prevent creating any drainage issues,
and pavement markings to meet Miami-Dade County Public Works and City of Miami
Standards.
I:-DUCATION
B.S.C.E., Florida
International University,
(1999)
PROF-E:SSIONAL
REGISTRATIONS
Florida P.E. #60737 (2004)
YEARS OF EXPERIEN( F
1 0 years
PROFESSIONAL
EXPERIENCE:
Mr. Sequeira has 11 years of
experience working as a
Transportation Engineer in
conjunction with the Florida
Department of
Transportation and local
agencies. Mr. Sequeira has
worked on a number of
projects including RRR and
Roadway Reconstruction
projects. Within these
projects, Mr. Sequeira has
conducted flexible pavement
design, and produced traffic
control, drainage, cross
sections, signalization,
signing and marking. He has
mastered the use of design
software tools including
MicroStation va, Geopak,
GuideSign, AutoTurns, and
Arcview.
CERTIFICATIONS:
Advanced Maintenance of
Traffic, Signals Level 1 ,
Geopak Road 1, Concrete
Pavement Design,
Construction and
Rehabilitation, and Flexible
Pavement Design.
CONTINUING EDUC A TlON
FDOT Advanced
Maintenance of Traffic
Certified
Survey Workshop
FDOT 04 OC
0FFIC F I OrATION Miami
OmETRIC
~ ENGINEERING
WHY THINGS WORI<
ANTONIO PIE:DHA, P E., C.P M.
Sf:NIOR PROJEC T E-NGINEER
I"lROF E <., ;ldNAL F r l HIE NeE
N WE mbt r 2009 Pit ,"nt Pending Assignment
January )005 Octo be r 2009. FOOT District 4, Fort Lauderdale Opere I 1 '\ c"l
Engineer As an Area Engineer/Project Manager project level responsibilities included
developing project specific management plans which established the project's goals
and milestones; analyzing contractor claims, claim negotiations, schedule review and
project documentation quality control; established, implemented and monitored the
public awareness plan, reviewed supplemental agreements and time extensions and
served in a support function to Project Administrator's in the areas of contract
administration, personnel, and general construction issues. Reference(s): James
Jeffers, P.E. Broward Operations Construction Manager 954-958-7628
Key Projects and Ac,complishments
July 2007 July 2009 Dania Beach Blvd / US 1 RRR Grouping (10 1)
. Project scope includes milling and resurfacing, the installation of new
signalization, lighting, and landscaping on SR 5 (US1), Dania Bch Blvd, and A1A.
. Project Cost + $15 million
. Project exceeded FDOT and FTC goals for Time and Money
. 2009 FTBA Award Winner for Community Awareness & Utility Coordination
February 2005-May 2007 Broward Blvd RRR Project (10.1,10.4)
. Project scope includes bridge culvert construction, milling and resurfacing,
installation of new signalization, lighting, and landscaping on Broward Blvd.
. Project Cost + $11 million
. Project met established FDOT and FTC goals for Time and Money
E:.DU\.,ATION
Bachelors of Science in Civil
Engineering, May 1998
University of Florida,
Gainesville, Florida
State of Florida Professional
Engineer No. 59458
Certified Public Manager
PROFESSIONAL
CERTIFICATIONS
TIN#P360005730490
Certified Public Manager
(Levels 1-8)
FOOT Management Academy
FOOT Supervisor Academy
FOOT Construction Academy
CTOP OC Manager
CTOP Asphalt Level 1
CTOP Final Estimate I &11
MOT Intermediate
ACI
Drilled Shaft Installation
YEARS OF EXPERIFN( f
11 years
YEARS WITH METRIC
2 months
OFFICE LOCATION
Miami
January 2000 - August 2005: FOOT District 4, Fort Lauderdale Operation Projec.t AdministrCltor As Project
Administrator, primary focus was to ensure that the contractor provided a quality product in accordance with the
Department's plans and specifications and that the project met or exceeded the FDOT established time and
money goals. Project specific responsibilities included the review and approval of the construction (CPM)
schedule, the implementation of the public awareness plan, the Quality Assurance of project documentation
(monthly and final estimates packages, supplemental agreements, change orders, time extensions, material
certification, etc.), and the coordination of day to day activities between the contractors, municipalities, permitting
agencies and the Department. In addition, assisted in the resolution of contractor claims and extra work issues,
managed both in-house and consultant CEI personnel, and together with CEI team, developed the Project
Specific Management Plan. Reference(s): James Jeffers, P.E. Broward Operations Construction Manager.
954-958-7628
Key Projects and Accomplishments
October 2003 August 2005 Griffin Road Reconstruction Project (10 1 10 4)
· Project scope included bridge culvert construction, milling and resurfacing, signalization, lighting, and
landscaping along Griffin Road in Broward County
· Project Cost Approximately $12 million
· Developed a website, information fliers, and pamphlets for public awareness
· Project completed 100% of original time and within 103% of original budget
April2003 August 2003 US I Clnd 26' Street RRR project (10 1)
· Project scope included milling and resurfacing, signalization, lighting, and landscaping on US 1
. Project Cost Approximately $1 million
· Project completed under 100% of original time and within 105% of original budget
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
and (if applicable) its Federal Employer Identification Number (FEIN) is 59-1685550
(IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement:
2. I understand that a "public entity crime" as defined in Paragraph 287. I 33(1)(g), Florida Statutes,
means a violation of any state or federal law by a person with respect to and directly related to the
transaction of business with any public entity or with an agency or political subdivision of any other
state or of the United States, including, but not limited to, any bid or contract for goods or services to
be provided to any public entity or an agency or political subdivision of any other state or of the
United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or
material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287 .133(1)(b), Florida Statutes
means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of
guilt, in any federal or state trial court of record relating to charges brought by indictment or
information after July I, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or
nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287. I 33(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity come. The term "affiliate" includes those officers,
directors, executives, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
market value under an arm's length agreement, shall be a prima facie case that one person
controls another person. A person who knowingly enters into a joint venture with a person who
has been convicted of a public entity crime in Florida during the preceding 36 months shall be
considered an affiliate.
5. I understand that a "person" as defined in Paragraph 287.133(l)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States with
the legal power to enter into a binding contract and which bids or applies to bid on contracts
for the provision of goods or services let by a public entity, or which otherwise transacts or
applies to transact business with a public entity. The term "person" includes those officers,
directors, executives, partners, shareholders, employees, members, and agents who are active
in management of any entity.
6. Based on information and belief, the statement which I have marked below is true in a relation to
the entity submitting this sworn statement. (Please indicate which one (I) of the following three
(3) statements is applicable.)
X (l)Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(2)The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(3)The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the
State of Florida, Division of Administrative Hearings and the Final Order by the Hearing
Officer determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD
AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE
CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS
FORM.
Robert Linares, PE
(Printed or Typed Legal Name of Affiant)
State of :flOc, 1'10 County oM, 0iY\\ ~6e... '. ~
Sworn to and subscribed before me this ~...yhday of j'J\~
<7o\oe,~ G()~e~
~'\anO\oCyJp~
Notary's Name printed,/tam ed or Typed
Personally Known: or Produced Identification
,2010 by
Notary Seal:
......~~.~:'fY',~,,, DlANA TOME'
~:lf"tf:;;. ~:= MY COMMISSION # DO 864434
~ ~':~i EXPIRES: March 24. 2013
,.t.i;;F'.-:{t~ Bonded Thru Notary Public UnderMiter.;
"'"Il~
Identification Produced
NON-COLLUSIVE AFFIDA VIT
State of Florida)
County of Miami-Dade)
Robert Linares, PE
and says that:
being first duly sworn, deposes
(I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all
pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or
parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly
or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with
the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with
such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or
communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached
Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid
price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful
agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the
proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by any collusion,
conspiracy, connivance, or unlawful agreement on the part of the Bidder or any other of its agents,
representatives, w ers, employees or parties in interest, including this Affiant.
F AFFIANT
Robert Linares, PE
(Printed or Typed Legal Name of Affiant)
State of f IDV lOA- County of M\ 'QXY\'( DQde..-
Sworn to and subscribed before me this dS+h day of
<f<o~-\- L\n~(eS
MC1'j
,2010 by
b\O(\~ \ O'{YI~
Notary's Name Printed, Stamped or Typed
/ or Produced Identification
Notary Seal:
Personally Known:
",~v:'f~"", DIANA TOME'
f:f'-~~:~ MY COMMISSION # DD 864431
~,~,:'ff EXPIRES: March 24, 2013
"l,i.....<t' Bonded Thru Notary Public Underwriters
',Rf,,~~\'
Identification Produced
:
Corporate Certificates
State of Florida
Department of State
I certify from the records of this office that METRIC ENGINEERING
INC. is a corporation organized under the laws of the State of Florida,
filed on July 27,1976.
The document number of this corporation is 509621.
I further certify that said corporation has paid all fees due this office
through December 31, 2010, that its most recent annual repOlt was filed
on January 19,2010, and its status is active.
I fmther celtify that said corporation has not filed Alticles of
Dissolution.
Gilleu ulIder lilY haud aud the Great Seal of
Florida, at Tallahassee, the Cllpital, this the
Tweutieth day of.ftl1luary, 2010
~"'6
Secretary of State
Authentication 10: 500166690665-012010-509621
To authenticate this certificate, visit the following site, enter this
10, and then follow the instructions displayed.
https://efile.sunbiz.org/certauthver.html
State of Florida
Department of State
I certify fi'om the records of this office that GEOSOL, INC. is a
corporation organized under the laws of the State of FIOlida, filed on
April 7,2000.
The document number of this corporation is P00000035530.
I further cel1ify that said corporation has paid all fees due this office
through December 31, 2010, that its most recent annual report was filed
on January 12,2010, and its status is active.
I fU11her cel1ify that said corporation has not filed Articles of
Dissolution.
Givell ullder my halld alld the Great Seal of
Florida, (It T(lll(I/Ulssee, the Capital, this the
Fourteellth day of Jalluary, 2010
~"-a
Secretary of State
Authentication!D: 300165903223-011410-P00000035530
To authenticate this certificate,visit the following site, enter this
!D, and then follow the instructions displayed.
h ttps://efile.sun biz.org/certau th ver .html
:
State of Florida
Department of State
I certify from the records of this office that MANUEL G. VERA &
ASSOCIATES, INC. is a corporation organized under the laws of the
State of Florida, filed on April 27, 1977.
The document number of this corporation is 534958.
I further certify that said corporation has paid all fees due this office
through December 31, 2010, that its most recent annual report was filed
on April 14, 2010, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution.
Given under my hand and the Great Seal of
Florida, at Tallahassee, the Capital, this tlte
Fifteenth day of April, 2010
~V'6
Secretary of State
Authentication lO: 000175711750-041510-534958
To authenticate this certificate, visit the following site, enter this
!D, and then follow the instructions displayed
https://efile.sunbiz.org/certautbver.btml
State of Florida
Department of State
I certify from the records of this office that ROSENBERG DESIGN
GROUP, INC. is a corporation organized under the laws of the State of
Florida, filed on May 4, 1993.
The document number of this corporation is P93000032512.
I fUliher certify that said corporation has paid all fees due this office
through December 31, 2010, that its most recent annual repOli was filed
on January 12,2010, and its status is active.
I fUliher celiify that said corporation has not filed Aliicles of
Dissolution.
Gillel/ ul/der 111)' }ulIld alld the Great Seal of
Florida, at Tallahassee, the Cupit"l, this the
FOllrteel/th da)' of Jalluary, 2010
~""6
Secretary of State
Authentication!D: 200165839482-011410-P93000032512
To authenticate this certificate,visit the following site, enter this
!D, and then follow the instructions displayed.
https:/lefile.sunbiz.org/certauth\'er.html
REFERENCES - METRIC ENGINEERING, INC.
Client's Name:
Address:
Client's Representative:
Phone No.:
Client's Name:
Address:
Client's Representative:
Phone No.:
Client's Name:
Address:
Client's Representative:
Phone No:
Client's Name:
Address:
Client's Representative:
Phone No:
FOOT - District VI
1000 NW 111 Avenue
Miami, FL 33172
Vilma Croft, PE
(305)
FOOT - District VI
1000 NW 111 Avenue
Miami. FL 33172
BaoYing Wang, PE
(305)
City of Miami
Public Works Department
444 S.W. Second Avenue, 8th Floor
Miami, Florida 33130
Jose Lago, P.E., CIP Project Manager
(305) 416-1252
Miami-Dade Transit
111 N.W. First Street, Suite 1500
Miami, Florida 33128
Armando Lopez, PE
(786) 469-5256
METRIC ENGINEERING. INC. SIMILAR PROJECTS
Project Name:
PROFESSIONAL GENERAL ENGINEERING CONSULTANT
Location:
Sunny Isles Beach, Florida
Description:
General engineering services which include drainage improvements, site improvements,
permitting, traffic, intersection analysis, access management,
roadway improvements, hurricane recovery and debris monitoring
services, public involvement.
Work Order No.1
· Sunny Isles Historic Pelican Monument
Project involved the installation of a salvaged Historic
Pelican Monument to the new Sunny Isles Beach Civic
Center Building. Engineering work consisted of preliminary
field investigations to determine the necessary structural
retrofit and appropriate attachment design to withstand
hurricane force wind loads. Structural design plans and calculations were
prepared for the necessary construction. Metric's Fee: $5,000
Client:
City of Sunny Isles Beach
Owner's Representative:
Rick Conner
18070 Collins Avenue
3rd Floor
Sunny Isles Beach, FL 33160-2723
305-792-1773
Design Cost: Varies
Project Name:
GENERAL ENGINEERING SERVICES CONTRACT
Location:
Miami, Florida
Description:
Miscellaneous projects:
· FlU 109th Avenue Improvements
· FlU Recrational Field
· W1 Building Access Road
· FlU PG-3 Irrigation Improvements
Client:
Florida International University
Owner's Representative:
Page 1
Alberto Delgado
Campus Support Complex, Room 236
University Park, Miami, FL 33199
305-348-4036
Design Cost: Varies
Project Status: On-going
Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT
Project Name:
DOWNTOWN INFRASTRUCTURE STREET PHASES I AND II
Location:
Miami, Florida
Description:
Street improvements (RRR) in the Miami Downtown project. The project covers all the
streets at the center of Miami Downtown under jurisdiction of the City of Miami and
extends North to South from North 5th to South 4th Street and West to East from 1-95 to
Biscayne Boulevard. Project involves milling and resurfacing, sidewalk restoration, ADA
ramp reconstruction, new landscape installation, drainage improvements and utility and
traffic signal modifications. Project also includes coordination with the Department of
Homeland Security, FDOT, M-DCPWD and the City of Miami
Client:
City of Miami
Owner's Representative:
David Mendez, PE
444 SW 2nd Avenue, 8th Floor, Miami, FL 33130
(305) 416-1240
Design Cost: $169,110
Estimated Construction Cost: $1,447,370
Project Status: February 2005 - January 2007
Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT
Project Name:
NE 38TH STREET RESURFACING PROJECT
Location:
Miami, Florida
Description:
Reconstruction of 0.22 miles of urban collector roadway between North Miami Avenue
and NE 2nd Avenue in downtown Miami. Improvements consisted of milling and
resurfacing, widening, drainage and street lighting improvements. The project also
included coordination with a light rail system.
Client:
City of Miami
Owner's Representative:
Tatiana Acosta, P.E.
Page 2
444 SW 2nd Avenue, 8th Floor, Miami, FL 33130
(305) 416-1263
Design Cost: $96,291
Estimated Construction Cost: $605,829
Project Status: February 2005 - March 2007
Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT
Project Name:
DR. MARTIN LUTHER KING BOULEVARD
Location:
Miami, Florida
Description:
The Fast-track production of Resurfacing restoration and rehabilitation (RRR)
improvements for the Dr. Martin Luther King, Jr. Boulevard (NW 62nd Street). Dr. Martin
Luther King, Jr. Boulevard is a major urban road consisting generally of a four lane
divided configuration with left and right turn lanes. The project corridor extends in two
sections from NW 3ih Avenue to NW 1 ih Avenue (under Miami-Dade County
jurisdiction) and from NW 12th Avenue to 1-95 (under City of Miami), with an
approximate length of 2.56 miles and 0.64 miles respectively. The project design
involves milling and resurfacing, sidewalk beautification and restoration, ADA ramp
reconstruction, landscape restoration, new lighting and reconstruction of several linear
parks. The project also includes coordination with FDOT, M-DCPWD and the City of
Miami.
Client: City of Miami
Owner's Representative:
Kevin Brown, P.E.
444 SW 2nd Avenue, 8th Floor, Miami, FL 33130
(305) 416-1090
Design Cost: $124,294.00
Estimated Construction Cost: $2,591,660
Project Status: February 2005 - May 2007
Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT
Project Name:
NE 71 ST STREET STORM SEWERS
Location:
Miami, Florida
Description:
Roadway improvements to two miles of urban roads and stormwater management
systems to mitigate flooding conditions within 35 acres of urban watershed.
Responsible for the design of all open and closed storm sewer systems in accordance
with City of Miami, SFWMD, and Miami-Dade DERM criteria as well as project
permitting with DERM, FDEP, and USACE, including milling and resurfacing of the
project area. The drainage design involves roadside swales, exfiltration facilities,
Page 3
~~~/<,
'" a ~ I!I
~ rJl~
'/^,E~~
pollution control structures, gravity wells, and multiple discharge points into waters of
the United States.
Client:
City of Miami
Owner's Representative:
Jose Lago, P.E.
444 SW 2nd Avenue, 8th Floor, Miami, FL 33130
(305) 416-1252
Design Cost: $119,509
Estimated Construction Cost: $1,272.649
Project Status: August 2004 - April 2006
Contract Type: CITY OF MIAMI CONTINUING SERVICES CONTRACT
Project Name:
VIRGINIA KEY BEACH PARK
Location:
City of Miami, Florida
Description:
Design of renovation for the eight-acre park and roadway improvements to Virginia
Beach Drive and a circulation road adjacent to the beach front and mangrove wetlands.
The project included site design for reconstruction of a parking lot, stormwater
management improvements, new lighting systems, landscape design and permitting.
The project also included construction across the Coastal Construction Control Line and
mitigation for improvements in a marine turtle habitat environment.
Client:
City of Miami,
Department of Capital
Improvements and Transportation
Owner's Representative:
David Mendez, PE
444 SW 2nd Avenue, 8th Floor, Miami, FL 33130
305-416-1206
Design Cost: $200, 000
Estimated Construction Cost: $1,878,647
Project Status: February 2005 - May 2006
Page 4
Contract Type: CITY OF CORAL GABLES CONTINUING SERVICES CONTRACT
Project Name:
MIRACLE MILE STREETSCAPE IMPROVEMENTS
Location:
Coral Gables, Florida
Description:
Under a General Engineering Service Contract,
Metric provided design and planning services to
the City of Coral Gables for drainage
improvements, site design, safety studies,
intersection analysis, access management and
roadway improvements. The Miracle Mile
roadway improvement project involved the
development of design alternatives to reconfigure
travel lanes, on-street parking and sidewalks in
order to enhance the downtown business area
between LeJuene Road and Douglas Road. Streetscaping and sidewalk improvements
were developed to accommodate outdoor cafes while maintaining the character of the
Coral Gables downtown. Project activities included preparation of conceptual
engineering plans, public information meetings, and stakeholder meetings with the
Downtown Business District agents in order to reach consensus for the planned
improvements.
Client:
City of Coral Gables
Owner's Representative:
Alberto Delgado, P.E.
Department of Public Works, 2800 SW 72nd Avenue, FL 33155
305-460-5008
Design Cost: $250,000
Project Status: January 2004 - January 2005
Project Name:
GENERAL ENGINEERING SERVICES CONTRACT
Location:
Palm Beach, Florida
Description:
Design and plans preparation required for the construction of roadway and drainage
improvements. Following the approval of a comprehensive drainage study of two major
drainage basins, the Town of Palm proceeded with the design of a new storm water
management and conveyance system that required the reconstruction of several miles
of roadway within the Town limits. The project required a close coordination with utility
owners and property owners. It also required Roadway and drainage design and pump
station design with outfalls to the Intracoastal Waterways, which required close
coordination with SFWMD.
Page 5
Client:
Town of Palm Beach Public Works Department
Owner's Representative:
James Bowser, P.E.
951 Old Okeechobee Road
West Palm Beach, FL 33401
561-838-5440
Design Cost: Varies
Project Status:
Begin and End Dates: January 2001 - January 2005
Project Name: 12" WATER MAIN EXTENSION (City of Dania Beach along Dania
Beach Boulevard)
Location: Dania Beach Boulevard, Broward County
Description:
Metric is currently finalizing the design and construction
contract plans for the installation of approximately 4,280 LF
of a 12" potable water main to replace an existing 6" main
for the City. Utility improvements were originally included in
a Joint Project Agreement between the City and FOOT. In
order to expedite the City's need to provide additional water
service to adjacent residential development, Metric
Engineering was contracted to design the water main for
immediate installation while accommodating planned
roadway improvements including storm sewer systems and
sanitary sewer relocations. The design included relocation
of all existing water service connections as well as selection
of pipe materials to resist corrosion in the elevated water
table within the project corridor. Project construction plans included significant traffic
control plans to safely permit open-trench construction while managing high-volume
traffic from the beach area and the Dania Jai-Alai facility. Metric Engineering was also
responsible for securing Right-of-Way Occupation Permits from FOOT and permits from
Broward County Department of Environmental Protection and Health Department.
Client: City of Dania Beach
Owner's Representative:
Dominic Orlando, P.E.
Public Service Department
100 W. Dania Beach Boulevard
Dania Beach, FL 33004
954-924-3740
Design Cost: $20,000
Project Status: January 2006- August 2006
Page 6
Project Name:
FLORIDA KEYS CEI RESIDENCY
Location:
Key West, Florida
Description:
3-year contract with FOOT in the management and inspection of 15 contracts in the
Florida Keys. Many of these contracts will run concurrently and include roadway
reconstruction, drainage, signalization, milling and resurfacing, bridge rehabilitations
including metallizing and tendon repair and replacement. Also included are push button
contracts.
Client:
FOOT - District 6
Owner's Representative:
Charlie Phinizy, PE
1000 N.W. 111 Avenue
Miami, FL 33172
(305)481-0064
CEI Fee: $6,500,000
Estimated Construction Cost: $70,000,000
Project Status: Begin and End dates: March 2007 - Ongoing
Project Name:
NORTH ROOSEVELT BOULEVARD
Location:
Key West, Florida
Description:
Lighting and signal design for 3 miles of SR-A 1 A North Roosevelt Blvd. from Truman
Avenue to US-1.
Client:
FOOT - District 6
Owner's Representative:
Ali Toghiani, PE
1000 N.W. 111 Avenue
Miami, FL 33172
(305)470-5343
Design Cost: $91,163
Estimated Construction Cost: $2,122,463
Project Status: Begin and End dates: August 2006 - On-going
Project Name:
SR-A1A SOUTH ROOSEVELT BOULEVARD
Location:
Key West, Florida
Page 7
Description:
Reconstruction of three miles of an urban arterial for FOOT District 6. Project involved
complete reconstruction of seawall, pavement, sidewalk, and drainage systems as well
as significant project permitting.
Client:
FOOT - District 6
Owner's Representative:
Ali Toghiani, PE
1000 N.W. 111 Avenue
Miami, FL 33172
(305)470-5343
Design Cost: $655,288
Estimated Construction Cost: $5, 466, 029
Project Status: Begin and End dates: April 2006 - February 2007
Page 8
r;.,:{!J:I~~~I~~@I~I~::ffi~
Dr:J,.r..] ~ ~ ~ :,~ lit 1'llli:i']:1 "I'~" ~ [.] ~ I
1. TITLE AND LOCATION (City and State)
Professional Engineering Services
2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
April 27, 2010 10-01-01
r:J.L'f:{ ~: I ~ ~:;;( It 1"I::::lf:1![~ I ~ 1::l::l:1 :,l.] I ~ ~ ~ 1):.] ~ ~,~ let f
4. NAME AND TITLE
Robert Linares. PE
5. NAME OF FIRM
Metric Engineering, Inc.
6. TELEPHONE NUMBER 17. FAX NUMBER 8. E-MAIL ADDRESS
305-235-5098 305-251-5894 rlinares@metriceng.com
, , - I '{ _, ~6il.~'I-::'~ , : . , : ,
(Check)
a:
UJ 'a:
UJ Z Zo 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
~ I- 01-
ee a: 00
<( 10<(
Q.. Q.. :la:
> 001-
-)
Metric Engineering, Inc. 13940 SW 136 S1. Design and Post Design
Suite 200 Services, Bid Administration
Miami, FL 33186 Construction Management,
3. x Public Involvement, Structural
Eng., Hurricane Recovery and
I CHECK IF BRANCH OFFICE Debris Monitoring, CEI
Manuel G. Vera & Associates 13960 SW. 47 S1. Survey
Miami, FL 33175
b. x
r CHECK IF BRANCH OFFICE
Geosol, Inc. 5795-A NW 151st Street Geotechnical
Miami Lakes, FL 33014
x
c.
r CHECK IF BRANCH OFFICE
Rosenberg Gardner Design Group Palmetto Lakes Executive Building Landcscape Architecture
5190 NW 167th S1., Suite 111
Miami, FL 33014
d. x
I CHECK IF BRANCH OFFICE
g. I CHECK IF BRANCH OFFICE
i.
I CHECK IF BRANCH OFFICE
[i),(1] :rtr'l ~ I ,...t., I [IJ ~,~ Lfll: "1:11 ~ :rl] :ll}:j::l t~ I
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004)
12. NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Enrique Antelo Project Manager a. TOTAL I b. WITH CURRENT FIRM
36 29
15. FI RM NAME AND LOCATION (City and State)
Metric Engineering, Inc./Miami, FL
16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE
BS Engineering Technology AND DISCIPLINE)
N/A
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
South Dade Busway - Segment II/Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2007
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Construction of a 7.3 miles of roadway and bike path for Miami-Dade Transit. Responsible for the desi~n of all roadway signalization, pavement
marking, and drainage systems as well as plans and contract document production and construc Ion administration. The project desi~n
involvea intersection Improvements, street I~htin~, signalization, maintenance of traffic, and engineered mitigation of in-situ contaminated SOl s
within significant portions of the project corri or. roject Manager. Metric's Fee: $4,657,807
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
NE 71s1 Street Storm Sewers/Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2007
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Roadway improvements to two miles of urban roads and storm water management systems to mitigate flooding conditions within 35 acres of
urban watershed. Responsible for the design of all open and closed storm sewer systems in accordance with City of Miami, SFWMD, and
Miami-Dade DERM criteria as well as project permitting with DERM, FDEP, and USACE, including milling and resurfacing of the project area.
Project Manager. Metric's Fee: $194,829.23
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
Washington Avenue Parking Lot/City of Homestead, FL PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2007
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Site development project for the City of Homestead Community Redevelopment Agency to create 122 car spaces parking lot
located in SE corner of Washington Ave. and NE 2nd Street. The Civil design included French drain system, ornamental lighting,
singing and pavement markings, landscaping and irrigation system.. Project Manager. Metric's Fee: $82,908.00
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
NW 9th Street Pedestrian Mall-Phases I & II/Miami, FL' PROFESSIONAL SERVICES CONSTRUCTION (If
2001 Applicable)
d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm
Metric was responsible for all Civil Design and ConstruMetric was the Prime Consultant for the Overtown Pedestrian Mall which eliminated
vehicular traffic on NW 9th Street and established a pedestrian mall in its place. Project Manager. Metric's Fee: $126,522
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
Force Main Improvements, City of Dania Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2007
e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Construction of 2,300 linear feet of 16" sanitary sewer force main under a joint project agreement between Dania Beach and
FOOT. The project involved fast-track design to upgrade and relocate existing sanitary systems in advance of planned road
improvements and to service local redevelopment. The project also involved significant traffic control, permitting, and post-design
services. Project Manager. Metric's Fee: $16,055
STANDARD FORM 330 (6/2004)
r'--~~PRO~OSE~--~~~
.L (Comp1e.te 9n~)e.9t!on E for each key person.) I
12. NAME
Robert Linares, PE
13. ROLE IN THIS CONTRACT
Principal-in-Charge
14. YEARS EXPERIENCE
a. TOTAL I b. WITH CURRENT FIRM
12 12
15. FIRM NAME AND LOCATION (City and State)
Metric Engineering, Inc./Miami, FL
16. EDUCATION (DEGREE AND SPECIALlZA TlON)
BSCE Civil Engineering
17.CURRENT PROFESSIONAL REGISTRATION (STATE
AND DISCIPLINE)
FUProfessional Engineer
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State)
SR-710 PD&E Study
OkeechobeelMartin Counties, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2009
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
Project Manager. PD&E Study for a 15-mile stretch of SR71 O( a FIHSISIS facility) in Martin County from the Okechobee/Martin County Line to
CR 609 The study will conSider additional thru lanes, special treatment and/or additional lanes at major intersections, and widening of the
crossroads up to 1000ft. in each direction where necessary to provide intersection operation at an acceptable LOS. In addition a grade
separated Highway/Rail crossing will be evaluated. This project will be developed following the ETDM methodology. Project Cost: $1.3 mimon.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR.836 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If
Miami-Dade County, FL Applicable)
2009
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
Project Manager for this PD&E project involves the potential realignment, capacity and geometric improvements to State Road 836 (SR-836),
an elevated expressway that traverses approximately 1.4 miles within the City of Miami. More specific improvements potentially involve the
provision of a minimum of six continuous mainline lanes and the provision of parallel collector distributor facilities. Project Cost: $1.6 million
(1) TITLE AND LOCATION (City and State)
1-395 PD&E Study
Miami-Dade County, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2008
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
Project Manager for this PD&E Study which entails the preparation of an EIS for a proposal to improve Interstate Route 1-395 in
Miami-Dade, Florida. The proposed improvement would involve the reconstruction of 1-395 from 1-95/Midtown Interchange to
Biscayne Bay, a distance of 1.2 miles. Improvements to the corridor are considered necessary to provide for the existing and
projected traffic demand. Project Cost: $1.3 million
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Krome Avenue North PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If
Miami-Dade County, FL 2006 Applicable)
d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Project Manager for this study which investigated the proposed widening of Krome Avenue, one of South Florida's most rural corridors. The
project included a detailed safety analysis of the corridor and comprehensive alternative generation and selection process. Furthermore, the
study required the preparation of preliminary engineering reports and master plans as well as extensive environmental work and coordination
with all the regulatory agencies. Project Cost: $1 million
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
th
NW 14 Street Access Improvements to 1-395 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If
Miami-Dade County, FL Applicable)
2005
e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [8] Check if project performed with current firm
Project Engineer for this PD&E Study for the addition of on/off ramps to 1-95 and 1-395. Study requires a comprehensive PD&E
analysis and IJR. The project includes preliminary and final engineering reports and master plans, traffic modeling and technical
memorandum, and extensive public involvement with the Overtown area. Project Cost: $900,000.
STANDARD FORM 330 (6/2004)
~;I~'1IJI'jl~"@~=l;~~']~I~I=lL,~~
~. - - 'JIII_Il' - . -, - . Llf
12.NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Allan Sequeira, PE Project Engineer a. TOTAL I b. ~ITH CURRENT FIRM
10
15. FIRM NAME AND LOCATION (City and State)
Metric Engineering, Inc.
16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE
BSCE, Florida International University, 1999 AND DISCIPLINE)
Florida PE #60737 (2004)
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
SR-112 Toll Plaza Conversion, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2007 2008
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Project consisted of three primary elements: roadway, toll plaza, and employee parking area. Roadway consisted of expanding
the merging and diverging areas, correcting roadway cross slope, drainage, signing & pavement markings, MOT and roadway
lighting. The toll plaza portion consisted of the conversion of two dedicated Sun Pass lanes to express SunPass lanes, the
parking was reconfigured. Contract Value: $1.5M. Project Engineer
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
MIC Rental Car Center Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
2007 On-going
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Design and development of the Site Civil Construction Plan for the proposed Rental Car Facility This 3.4 million square foot
"rental car shopping mall" will provide customers arriving through MIA convenient access to participating rental car companies.
Contract Value: $1.4M. Project Engineer
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
S.W. 62" Avenue (SW24th Street to NW 7th Street) PROFESSIONAL SERVICES CONSTRUCTION (If
Miami-Dade County, FL Applicable)
2008 NIA not started
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Prepare a Contract Plans Set for the total reconstruction of a 2.0 mi segment of this urban corridor. Including upgrading one
signalized intersections from span-wire to mast-arm, implementation of a traffic safety study, compliance with ADA
requirements, drainage design, signing & pavement markings, maintenance of traffic and the design of a new street lighting
system. Contract Value: $393,290. Designer of Record
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-997/Krome Avenue from US-1 to Avocado Drive 1 SW296th PROFESSIONAL SERVICES CONSTRUCTION (If
Street, Miami-Dade County, Florida 2009 Applicable)
N/A
d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Prepare Construction Documents (plans and specifications) for the 3.78 mile segment of this urban corridor, including signing &
pavement markings, upgrading seven signalized intersections from span-wire to mast-arm, a new signalized intersection, 0.5 mi
of lighting, implementation of four traffic safety studies, implementation of Access Management and compliance with ADA
requirements, Landscaping & Irrigation within the City of Homestead Florida. Contract Value: $1.0M. Project Engineer
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Lummus Neighborhood- Streetscape Improvements PROFESSIONAL SERVICES CONSTRUCTION (If
City of Miami Beach, Florida Applicable)
2007 2009
e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
Project consisted of improving the water main and drainage in the Lummus Neighbourhood, for 6th Street, ih Street, 8th Street,
9th Street, 10th Street, 11th Street, 12th Street, 13th Street, 14th Street, 14th Lane and Espanola Way. Storm water pipe
upsizing and drainage was incorporated to the drainage improvements. Milling & Resurfacing, signing and
pavement marking, street lighting and aesthetic enhancement. Contract Value: $1.5M. Project Engineer
STANDARD FORM 330 (6/2004) PAGE
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Raul Driggs, PhD, PE Traffic Engineer a. TOTAL I b. WITH CURRENT FIRM
43 32
15. FIRM NAME AND LOCATION (City and State)
Metric EnQineering, Inc./Miami, FL
16. EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE
PhD, Transportation Engineering AND DISCIPLINE)
MS, Civil Engineering FL, PAlProfessional Engineer
BS Civil Engineering
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Value Engineering Certification
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-710 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If
Okeechobee/Martin Counties, FL Applicable)
2009
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Senior Project En~neer. PD&E Study for a 15-mile stretch of SR71 O(a FIHS/SIS facility) in Martin Countt from the OkechobeelMartin Countx
Line to CR 609 e studt will consider additional thru lanes, special treatment and/or additional lanes a major intersections, and widening of
the crossroads up to 100 ft. in each direction where necessary to provide intersection operation at an acceptable LOS. In addition a wade
separated Highway/Rail crossing will be evaluated. This project will be developed following the ETDM methodology. Project Cost: $1.3 mil Ion.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Krome Avenue North PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If
Miami-Dade County, FL Applicable)
2006
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Senior Project Engineer. This study investigated the proposed widening of Krome Avenue, one of South Florida's most rural corridors. The
project included a detailed safety analysis of the corridor and comprehensive alternative generation and selection process. Furthermore, the
study required the preparation of preliminary engineering reports and master plans as well as extensive environmental work and coordination
with all the regulatory agencies. Project Cost: $1 million
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
NW 14th Street Access Improvements to 1-395 PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If
Miami-Dade County, FL Applicable)
2005
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Project Manager. PD&E Study for the addition of on/off ramps to 1-95 and 1-395. Study requires a comprehensive PD&E analysis
and IJR. The project includes preliminary and final engineering reports and master plans, traffic modeling and technical
memorandum, and extensive public involvement with the Overtown area. Project Cost: $900,000.
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
Eller Drive PD&E Study PROFESSIONAL SERVICES CONSTRUCTION (If
Broward County, FL 2004 Applicable)
d (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with C1lrrent firm
I
Project Manager. Study for the grade-separation of Eller Drive, the primary access route into Port Everglades in Ft. Lauderdale, Florida. The
study required a comprehensive analysis and the development of alternatives for providing an overpass over an important FEC rail spur to the
South port area of the port. It also included improving the flow of traffic circulation between Port Everglades and Ft. Lauderdale International
Airport. Project Cost: $1.5 million.
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
NW 87th Avenue From NW 58th Street to Just North of PROFESSIONAL SERVICES CONSTRUCTION (If
Okeechobee Road PD&E Study Applicable)
Miami-Dade County, FL 2004
e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Project Manager. PD&E Study for a 3-mile segment of this primary north/south urban arterial roadway. Study requires a
comprehensive PD&E analysis to continue the four lanes from NW 58th Avenue to NW 103rd Street in Hialeah Gardens, including
a thorough access management study and documentation, public involvement, the production of a traffic technical memorandum,
preliminary and final engineering reports and master plans. Project Cost: $792, 236
STANDARD FORM 330 (6/2004)
~r:i~'i!~[.]:~~~=~~~.]~li:~
12. NAME ~ 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Douglas Ruggiano, PE Structural Engineer a. TOTAL I b. ~TH CURRENT FIRM
18
15. FIRM NAME AND LOCATION (City and State)
Metric Engineering, Inc.
16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17.CURRENT PROFESSIONAL REGISTRATION (STATE
BSCE - Structures AND DISCIPLINE)
P.EJFloridalCivil
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, ete.)
Florida Engineering Society (FES)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-95 Bridge Widening over Lake Washington Road PROFESSIONAL SERVICES CONSTRUCTION (If
Brevard County, FL Applicable)
April 2005
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Project involved the widening of bridge nos. 700123(NB) and 700040(SB) along 1-95 over Lake Washington Road. The twin 4
span 172 ft. long AASHTO Type II girder/slab bridges were widened by 18ft. Doug servces as the Engineer of Record. Doug
performed the deck, girder and intermediate hammerhead pier designs. Estimated construction cost for bridge widening is
approximately $800,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
45th Street Bridge over FL Turnpike PROFESSIONAL SERVICES CONSTRUCTION (If
Palm Beach County, FL Applicable)
March 2007
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Bridge replacement project consisting of replacing the existing bridge with a 62,000 sf, 486 ft. long, 4-span Florida Bulb T-72
girder/slab superstructure w/spans of 126 ft. to 134 ft. The bridge alignment is on a slight curve and the piers are skewed 40
degrees. Doug was part of the design team and performed the prestressed bridge analysis, slab design and multi column pier
design founded on 18" square piles. Estimated construction cost of bridge is approximately $7.7 million.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 836 over SR 826 Bridge Repair PROFESSIONAL SERVICES CONSTRUCTION (If
Miami-Dade County, FL Applicable)
June 2000 December 2000
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
Emergency Bridge Repair project dealing with repairing impact damaged AASHTO Girders., Doug performed field inspection to
determine extent of damage and appropriate course of action. Doug was responsible for design and final construction
document preparation. Doug worked closely with the FOOT Materials dept. in development of repair plans to include the use of
CFRP laminates to strenghten prestressed girders with prestressed tendon damage. $220,000 Construction cost.
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
DASH III Extension PROFESSIONAL SERVICES CONSTRUCTION (If
Brevard & Volusia Counties, FL May 2006 Applicable)
d (3) BRIEF DESCRIPTION (Brief scope, ..size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
An ITS project that included 25 overhead highway cantilever OMS sign structures and 63 Mast Arm OMS Sign Structures.
Doug served as the Engineer of Record and performed the design c1aculations for the structures and drilled shaft foundations
for all the structures. Estimated construction cost for structures portion of project was $4.0 million.
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If
Applicable)
e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
STANDARD FORM 330 (6/2004) PAGE
~:I~'lIJl'jl~-@~ljJ=I:~~~~.]~li:g;?
~ -. . -. -.-.
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Ross Shillingford, P.E. Project Engineer a. TOTAL I b. ~TH CURRENT FIRM
13
15. FIRM NAME AND LOCATION (City and State)
Metric Engineering, Inc./West Palm Beach, FL
16. EDUCATION (DEGREE AND SPECIALlZA nON) 17.CURRENT PROFESSIONAL REGISTRATION (STATE
BSCE Florida Institute of Technology, 1995 AND DISCIPLINE)
Florida PE# 56901
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Florida Engineering Society, ASCE I FOOT Advanced Maintenance of Traffic
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
45th Street from Jog Road to Haverhill Road, PROFESSIONAL SERVICES CONSTRUCTION (If
Palm Beach County, Florida Applicable)
2008
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Project Manager and Engineer of Record. Existing two-lane 45th Street reconstructed to a four-lane divided, urban roadway, a distance of approximately 1.0
mile. It also included an elevated intersection & a bridge structure over Florida's Turnpike. Responsible for roadway & drainage design, signing & pavement
marking and signalization. Included signal replacement at Haverhill Road and a new mast arm signal at Jog Road. $1,120,000
(1) TITLE AND LOCATION (City and State) 2) YEAR COMPLETED
SR-7/US-441 From Broward/Palm Beach County Line to PROFESSIONAL SERVICES CONSTRUCTION (If
Glades Road, Palm Beach County, Florida Applicable)
FOOT District 4 2008
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Project Manager and Engineer of Record- Design and plans preparation for the resurfacing and rehabilitation of the existing six-lane, divided, urban arterial in
Broward County. Improvements include access management, drainage, signing, signalization, lighting and safety improvements. 4 existing span wire signals
were replaced with mast arms and 3 existing span wire signals were upgraded. $813,000
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
SR-710 (Beeline Highway) from Military Trail to Northlake PROFESSIONAL SERVICES CONSTRUCTION (If
Boulevard, Palm Beach County, Florida Applicable)
FOOT District IV 2005 2007
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Project Manager and Engineer of Record responsible for the design and plans preparation for the rehabilitation and widening of 3.5 miles of a 4 lane divided
limited access highway in Palm Beach County. The project involved milling and resurfacing, cross slope correction, drainage improvements, and the preparation
of lighting, signalization and maintenance of traffic plans. Included span wire signal upgrades at Haverhill Road and a signal replacement with mast arms at
Northlake Boulevard. $570,000
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
Congress Avenue, Melaleuca Ln / Lake Worth Rd Intersection PROFESSIONAL SERVICES CONSTRUCTION (If
Improvement 2004 Applicable)
Palm Beach County, FL 2006
d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Project Engineer -Plans and specifications for widening the existing 4-lane roadway to a 6 lane divided urban arterial including a box culvert extension over the
L-12 Canal, roadway, drainage, pavement markings, permitting and coordination with utilities and permitting agencies, right of way mapping and additional
services. Improvements included realignment to accommodate additional turn lanes, optimize use of the existing right-of-way, minimize business damages and
access impacts to adjacent gas stations and other adjacent property owners. $276,700
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Silver Beach Road from Congress Avenue to Old Dixie PROFESSIONAL SERVICES CONSTRUCTION (If
Highway On-going Applicable)
Palm Beach County, Florida
e (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [gJ Check if project performed with current firm
Project Engineer and Engineer of Record - Reconstruction of approximately 1 mile of the existing two-lane undivided, rural roadway to a 3-lane divided urban
arterial with roundabouts. Design involved a combination of a dry detention roadside swale and a wet detention offsite pond. The project also involved an
alignment study, R/W acquisition, complex access management and property impacts issues, and a new signal at Old Dixie Highway. ONGOING $470,000
STANDARD FORM 330 (6/2004)
gl:'~'i.lj .', l~i(!Iiif[337lrl::t :~"i.] ~I ~I ::tL,~ii.] ~ I.:~f'
~~~'JI!I=1;"W,JJ)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Edgar Munoz, PE Project Engineer a. TOTAl I ~ WITH CURRENT FIRM
10
15. FIRM NAME AND LOCATION (City and State)
Metric Engineering, Inc./West Palm Beach
16. EDUCATION (DEGREE AND SPECIALlZA TION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE
BSCE Universidad de Puerto Rico AND DISCIPLINE)
Florida PE#65440, Illinois PE#062-058373
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR-7/US441 from BrowardlPalm Beach County Line to Glades PROFESSIONAL SERVICES CONSTRUCTION (If
Road Applicable)
Broward County, Florida 2008
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Project Engineer - Design and plans preparation for the resurfacing and rehabilitation of the existing six-lane, divided, urban arterial
in Broward County. Improvements include access management, drainage, signing, signalization, lighting and safety improvements.
4 existing span wire signals were replaced with mast arms and 3 existing span wire signals were upgraded. $813,000
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Northlake Blvd. from Seminole Pratt to Coconut Road PROFESSIONAL SERVICES CONSTRUCTION (If
Palm Beach County, Florida Applicable)
2006
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Project Engineer/Preliminary and final roadway design, drainage design and permitting of a 3.4-mile reconstruction project.
Included signal improvements at Coconut Boulevard and a new signal at Grapeview Boulevard. $818,219
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Silver Beach Road from Congress Avenue to Old Dixie PROFESSIONAL SERVICES CONSTRUCTION (If
Highway Applicable)
Palm Beach County, Florida Ongoing
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Project Engineer - Project Engineer and Engineer of Record - Reconstruction of approximately 1 mile of the existing two-lane
undivided, rural roadway to a 3-lane divided urban arterial with roundabouts. Design involved a combination of a dry detention
roadside swale and a wet detention offsite pond. The project also involved an alignment study, RNJ acquisition, complex access
management and property impacts issues, and a new signal at Old Dixie Highway. ONGOING $470,000
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
45th Street from Jog Road to Haverhill Road, PROFESSIONAL SERVICES CONSTRUCTION (If
Palm Beach County, Florida 2008 Applicable)
d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Project Engineer - Existing two-lane 45'n Street reconsirucied to a four-lane divided, urban roadway, a distance of approximaiely 1.0
mile. It also included an elevated intersection & a bridge structure over Florida's Turnpike. Responsible for roadway & drainage
design, signing & pavement marking and signalization. Included signal replacement at Haverhill Road and a new mast arm signal
at Jog Road. $1,120,000
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
SR-710 (Beeline Highway) from Military Trail to Northlake PROFESSIONAL SERVICES CONSTRUCTION (If
Boulevard, Palm Beach County, Florida 2005 Applicable)
FOOT District IV 2007
e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [gI Check if project performed with current firm
Project Engineer - responsible for the design and plans preparation for the rehabilitation and widening of 3.5 miles of a 4 lane
divided limited access highway in Palm Beach County. The project involved milling and resurfacing, cross slope correction,
drainage improvements, and the preparation of lighting, signalization and maintenance of traffic plans. Included span wire signal
upgrades at Haverhill Road and a signal replacement with mast arms at Northlake Boulevard. $570,000
STANDARD FORM 330 (6/2004)
r:u;)~~!JI'II~~ ~~
. -.. - -. . -. -.-.
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
Antonio Piedra, PE, CPM Construction Management a. TOTAL I b. WITH CURRENT FIRM
11
15. FIRM NAME AND LOCATION (City and State)
Metric Engineering, Inc.
16. EDUCATION (DEGREE AND SPECIALlZA TlON) 17.CURRENT PROFESSIONAL REGISTRATION (STATE
BSCE University of Florida AND DISCIPLINE)
Florida PE Registration #59458
18.0THER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Griffin Road Reconstruction Project PROFESSIONAL SERVICES CONSTRUCTION (If
Ft. Lauderdale, FL Applicable)
2009
a (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
. Project scope includes bridge and culvert construction, new roadway construction, milling and resurfacing, the installation
of new signalization, lighting, and landscaping on Griffin Road from Flamingo Rd to Dykes Rd.
. Project Cost + $25 million
. Project is currently on schedule and within budget
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SR 7 (US 441) Grouping Reconstruction Project PROFESSIONAL SERVICES CONSTRUCTION (If
Ft. Lauderdale, FL Applicable)
2009
b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
. Project scope includes new roadway construction, milling and resurfacing, the installation of new signalization, lighting,
and landscaping on SR 7 from the Dade County Line to a pt north of Pembroke rd.
. Project Cost + $20 million
. Project is currently on schedule and within budget
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
Dania Beach Blvd / US 1 RRR Grouping PROFESSIONAL SERVICES CONSTRUCTION (If
City of Dania, FL Applicable)
2009
c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
. Project scope includes milling and resurfacing, the installation of new signalization, lighting, and landscaping on SR 5
(US 1), Dania Bch Blvd, and AlA.
. Project Cost + $15 million
. Proiect finished on time and within budaet (DUEL FTBA AWARD WINNER)
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
Stirling Road Resurfacing Project PROFESSIONAL SERVICES CONSTRUCTION (If
Ft. Lauderdale, FL 2009 Applicable)
d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
. Project scope includes milling and resurfacing, the installation of new signalization, landscaping and lighting on Stirling
Rd.
. Project Cost + $6 million
. Proiect is on schedule to achieve bonus comDletion date and under budaet
(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
Broward Blvd RRR Project PROFESSIONAL SERVICES CONSTRUCTION (If
Ft. Lauderdale, FL Applicable)
2009
e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
. Project scope includes bridge culvert construction, milling and resurfacing, the installation of new signalization, lighting,
and landscaping on Broward Blvd. from SR 7 to University Drive.
. Project Cost + $11 million
. Proiect was comoleted on time and within budaet
STANDARD FORM 330 (6/2004) PAGE
I;b~...
.
.....
~:I~Imr:J.
20. EXAMPLE
PROJECT KEY
NUMBER
21.TITLE AND LOCATION (City and State)
12" WATER MAIN EXTENSION (City of Dania Beach along Dania
Beach Boulevard)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2006
a. PROJECT OWNER
City of Dania Beach
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER
Dominic Orlando, PE 954-924-3740
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Design and construction contract plans for the installation of approximately 4,280 LF of a 12" potable water main to
replace an existing 6" main for the City. Utility improvements were originally included in a Joint Project Agreement
between the City and FDOT. In order to expedite the City's need to provide additional water service to adjacent
residential development, Metric Engineering was contracted to design the water main for immediate installation while
accommodating planned roadway improvements including storm sewer systems and sanitary sewer relocations. The
design included relocation of all existing water service connections as well as selection of pipe materials to resist
corrosion in the elevated water table within the project corridor. Project construction plans included significant traffic
control plans to safely permit open-trench construction while managing high-volume traffic from the beach area and the
Dania Jai-Alai facility. Metric Engineering was also responsible for securing Right-of-Way Occupation Permits from FDOT
and permits from Broward County Department of Environmental Protection and Health Department. Metric's Fee:
$20,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f
STANDARD FORM 330 (6/2004) PAGE
~~...
.
~
20. EXAMPLE
PROJECT KEY
NUMBER
. - -
21.TITLE AND LOCATION (City and State)
City of Homestead
Homestead, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2004-2008
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER
City of Homestead Dan Wick 305-224-4484
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
. Washington Avenue Parking Lot. 122 car spaces parking lot located in SE corner of Washington Ave. and NE 2nd
Street. The Civil design included French drain system, ornamental lighting, singing and pavement markings,
landscaping and irrigation system. ($82,908)
. Flagler Avenue Parking Lot. Site development project for the City of Homestead Community Redevelopment Agency
to create a new one-acre, 45-space parking facility in the Downtown Business District. Project involved site layout,
paving, drainage improvements, and integrated improvements with the adjacent South Dade Busway facility and
alleyway. ($54,104)
. Parking Lot at SW 4th Street. Fifteen car spaces parking lot located in the NW corner of SW 4th St. and SW 2nd Ave.
The civil design included French drain system, ornamental lighting, signing and pavement markings, landscaping and
irrigation system. ($49,800)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e
STANDARD FORM 330 (6/2004) PAGE
20. EXAMPLE
PROJECT KEY
NUMBER
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER
City of Homestead Dan Wick 305-224-4484
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
21.TITLE AND LOCATION (City and State)
City of Homestead Downtown Area Transportation Plan
Update
The study's purpose is to update the City's 1997 Homestead Traffic & Mobility Study to include
recommendations for truck movement accommodations, bicycle way alignments, traffic calming treatments,
and utilizing the new Miami-Dade County Busway within Homestead's urban core. Furthermore a
comprehensive parking study was completed as part of this study. Metric Fee: $68,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
STANDARD FORM 330 (6/2004) PAGE
20. EXAMPLE
PROJECT KEY
NUMBER
21.TITLE AND LOCATION (City and State)
Miracle Mile Streetscape Improvements
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2005
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER
Alberto Delgado, PE 305-460-5008
a. PROJECT OWNER
City of Coral Gables
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Under a General Engineering Service Contract, Metric provided design and planning services to the City of Coral Gables
for drainage improvements, site design, safety studies, intersection analysis, access management and roadway
improvements. The Miracle Mile roadway improvement project involved the development of design alternatives to
reconfigure travel lanes, on-street parking and sidewalks in order to enhance the downtown business area between
LeJuene Road and Douglas Road. Streetscaping and sidewalk improvements were developed to accommodate outdoor
cafes while maintaining the character of the Coral Gables downtown. Project activities included preparation of conceptual
engineering plans, public information meetings, and stakeholder meetings with the Downtown Business District agents in
order to reach consensus for the planned improvements. Metric's Fee: $250,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f
STANDARD FORM 330 (6/2004) PAGE
~
I
20. EXAMPLE
PROJECT KEY
NUMBER
flIUI!lJf:l..'~i ff!J!).
21.TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
South Dade Busway - Segment II PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
2008
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER
Miami-Dade Transit Isabel Padron, PE 305-375-4504
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
The Segment II extension of the South Dade Busway from Cutler Ridge to Florida City was a vital transportation
improvement of Miami-Dade County and an equally important enhancement to the communities along the 7.3 miles of the
project corridor. The project design involved the transformation of an abandoned railroad corridor into a transit roadway
that will extend and interconnect public bus routes and bicycle trails from Miami to Homestead and Florida City. Roadway
design plans also included intersection improvements, street lighting, signalization, and maintenance of traffic. Special
drainage design and earthwork measures were required to mitigate in-situ contaminated soils within significant portions of
the project corridor. Significant public involvement with all impacted comm unities along the entire corridor was also
important to the success of this project. Metric's Fee: $4,657,807 Construction Cost: $38 million
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f
STANDARD FORM 330 (6/2004) PAGE
lib
~I:IoJim
20. EXAMPLE
PROJECT KEY
NUMBER
. - -
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (if Applicable)
On-going
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT PHONE NUMBER
City of Miami Tatiana Acosta 305-416-1263
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
21.TITLE AND LOCATION (City and State)
Traffic Study - Bridgeport Ave and SW 30 Ct.
Miami, FL
Traffic Study to resolve traffic cut through, speeding and other concerns reported at Bridgeport Ave and SW 30 CT
between US1 and Bird Ave within the City of Miami. The study will include such issues as traffic circulation, geometry,
crash analysis (years 2005 to 2007), trip generation and attraction, etc. In addition, a pre-meeting with FDOT to properly
coordinate the objectives and procedures of the study will be conducted as the initial study task. The study area is
bounded by NW 2ih Ave. on the east, Bird Ave. on the south and US-1 along the north and west.
Study Fee: $43,974
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f
STANDARD FORM 330 (6/2004) P,AgE
I:rbt~ I] I].. [.] ~ ,~~ L,lill;('] :ll'J ,~,. [.] ~ I
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
31.SIGNATURE
I .
32.DATE
5-25-10
STANDARD FORM 330 (6/2004)
~E:::J~~~r";Ml']~~ 1. SOLICITATION NUMBER (If
any)
RFQ#2010-01
If
2a. FIRM (OR BRANCH OFFICE) NAME (<'~~/<, 3. YEAR 4. DUNS
Metric Engineeirng, Inc. ESTABLISHED NUMBER
ImH' ~I!I' 1976 083104604
2b. STREET ,~ J-JI~I 5. OWNERSHIP
13940 SW 136 Street '/tvE~~ a. TYPE
Corporation
2c. CITY 12d. STATE 2e. ZIP CODE b. SMALL BUSINESS STATUS
Miami FL 33186 N/A
6a. POINT OF CONTACT NAME AND TITLE 7. NAME OF FIRM (If block 2a is
Robert Linares, PElVice President a branch office)
6b. TELEPHONE NUMBER !6C. E-MAIL ADDRESS
305-235-5098 rlinares@metricenq.com
8a. FORMER FIRM NAME(S) (If any) 8b.YR 8c. DUNS
ESTABLISHED NUMBER
N/A N/A N/A
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
. ~. r.IJ:l:l,i~~i.[:)
I!l~ ~~'L;J.;}""t . l!!.~ft;Jllli;J IIil'!m
& dm ~
. , -
--,'.
~ . . : m (!iFj ~~IIJ/;IIt:I!l'i1lI.~ln Q
m ~1~/,;l:I.rtol7 UiD lmi} ~-~ [1)
~.,..
m ~']IJ..1JJ'l~llf:~ m ITl!Iil Ii3
. ~. .. -. . ~
m ~('llllit;JI_~ il EillID ~~[:~~IH"1 F.J
~ ~.rqo!F.1l'M " mil ~~!.l~;jr.r.r.l ~
-
rn ~'e il rrn>> ~.r'l~II.lI.tI..~1 rn
f.f) ~ ,- .~.. m
m fmi!'G~III[q;J' ~
~ ~~ m
€il 'lit: 111-"i !l'lLlillt.Jif:{-.r .f11 [q;J, EE
mm ml
11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER
SERVICES REVENUES OF FIRM 1. Less than $100,000 6. $2 million to less than $5 million
FOR LAST 3 YEARS
(Insert revenue index number shown at riQht) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
b. Non-Federal Work 9 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
c. Total Work 9 5. $1 million to less than $2 million 10. $50 million or greater
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE b.DATE
~ 5-25-10
c. NAME AND TITLE
Robert Linares, PE
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1
I '
Metric Engineering, Inc. and Subsidiary
Consolidated Financial Statements
June 30, 2008
Metric Engineering, Inc. and Subsidiary
Consolidated Financial Statements
June 30, 2008
CONTENTS
Independent Accountants' Compilation Report
Consolidated Financial Statements:
Consolidated Balance Sheet
Consolidated Statement of Operations and Retained Earnings
Consolidated Statement of Cash Flows
Notes to Consolidated Financial Statements
Supplementary Schedule:
Consolidated Schedule of Direct Cost and
General and Administrative Expenses
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I )(c).
2
3
4
5 - 11
12
)
IIII:~RT&C
"~IUh_,,,-- ~___ Mm._.I:::.. wmUl~JIlV- J!lJ.AI.
ROI)ltIGUEZ,'rRUFBA 8. CO,,1>/\
CERTIFIED PUBLIC ACCOUNTANTS
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
INDEPENDENT ACCOUNTANTS' COMPILATION REPORT
To the Board of Directors
Metric Engineering, Inc. and Subsidiary
Miami, Florida
We have compiled the accompanying consolidated balance sheet of Metric Engineering,
Inc. and Subsidiary (a group of Florida corporations) ( the "Company") as of June 30,
2008, and the related consolidated statements of operations and retained earnings and cash
flows for the year then ended, and the accompanying consolidated supplementary
information contained in page 11, which is presented only for supplementary analysis
purposes, in accordance with Statements on Standards for Accounting and Review Services
issued by the American Institute of Certified Public Accountants.
A compilation is limited to presenting in the form of consolidated financial statements and
consolidated supplementary schedules information that is the representation of
management. We have not audited or reviewed the accompanying consolidated financial
statements and consolidated supplementary schedules and, accordingly, do not express an
opinion or any other form of assurance on them.
7(<J~~, r~~ tt (}<J~
Rodriguez, Trueba & Company, P A
Doral, Florida
November 19,2007
Doral Office: 19B5 NW BB'h Court, Suite 102, Doral, FL 33172 . Phone: 305-593.2644 . Fax: 305.593.0390
Miami,Lakes Office: 8040 SW 155'h st., Suite 206, Miami Lakes, FL 33016 'Phone: 305.779.1120 'Fax: 305.779.1121
www.rtc-cpa.com
Member of the American Institute of Certified Public Accountants . Member of the Florida Institute of Certified Public Accountants
/,
Metric Engineering, Inc. and Subsidiary
Consolidated Balance Sheet NOT FOR PUBLIC INSPECTIO;'\l! DO ;'\lOT COpy
This financial statement is private and exempt from public
June 30, 2008 inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
ASSETS
Current Assets
Cash and cash equivalents $ 1,038,011
Net contracts and retainages receivable 10,002,283
Cost and estimated earnings in excess of billings 1,230,489
Receivable from employees 161,818
Short-term deferred tax asset 1,020,743
Total Current Assets 13,453,344
Certificate of Deposit 88,584
Property and Equipment - net of depreciation 999,821
Other Assets
Goodwill 399,000
Intangible software costs - net 182,183
Prepaid expenses and security deposits 330,784
Cash surrender value 355,956
Total Other Assets 1,267,923
Total Assets $ 15,809,672
LIABILITIES AND STOCKHOLDERS' EQUITY
Current Liabilities
Line of credit
Notes payable - current portion
Accounts payable
Accrued expenses
Income taxes payable
Short-term deferred tax liability
Total Current Liabilities
$
620,000
134,735
2,025,005
1,004,271
11,159
4,417,575
8,212,745
266,667
8,479,412
Notes payable
Total Liabilities
Stockholders' Equity
Common stock, $10 par value, 100 shares authorized,
issued and outstanding
Capital contributed in excess of par value
Treasury stock
Retained earnings
Total Stockholders' Equity
Total Liabilities and Stockholders' Equity
1,000
10,600
(192,000)
7,510,660
7,330,260
15,809,672
$
Read the independent accountants' compilation report and the notes to the financial statements.
2
~.~
. I
Metric Engineering, Inc. and Subsidiary
Consolidated Statement of Operations and Retained Earnings
For the year ended June 30, 2008 NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Contract Revenues Earned $ 37,949,817
Direct Cost 21,544,335
Gross Margin 16,405,482
General and Administrative expenses 16,222,269
Operating Income 183,213
Other Income and (Expenses)
Interest income 37,296
Other Income 76,512
Interest expense (89,205)
Total Other Income and (Expenses) 24,603
Income Before Income Taxes 207,816
Federal and State Income Tax (Provision)
Currently payable (147,029)
Deferred tax benefit from reversal of temporary differences 93,000
Total (54,029)
Net Income 153,787
Retained Earnings - July 1, 2007 7,308,207
Prior period adjustment 48,666
Retained Earnings - June 30, 2008 $ 7,510,660
Read the independent accountants' compilation report and the notes to the financial statements.
3
Metric Engineering, Inc. and Subsidiary
Consolidated Statement of Cash Flows NOT FOR PUBLIC I;'\lSPECTlO;'\l / DO NOT COpy
This financial statement is private and exempt from public
For the Year Ended June 30, 2008 inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Cash Flows from Operating Activities:
Cash received from contract revenues
Cash paid to suppliers and employees
Income taxes paid
Interest paid
Interest earned
Net Cash Provided by Operating Activities
$ 37,291,591
(36,300,199)
(144,490)
(89,205)
37,296
794,993
Cash Flows from Investing Activities:
Investment in Certificate of Deposit
Proceeds on disposal of equipment
Net Cash (Used in) Investing Activities
(1,084)
14,243
13,159
Cash Flows from Financing Activities:
Payments oflong term debt
Net borrowings
Net Cash (Used in) Financing Activities
(283,270)
(340,000)
(623,270)
Net (Decrease) in Cash and Cash Equivalents
184,882
Cash and Cash Equivalents at July 1, 2007
Cash and Cash Equivalents at June 30, 2008
$
853,129
1,038,011
Reconciliation of Net Income to Net Cash
Provided by Operating Activities
Net Income
Adjustment to Reconcile Net Income to Net Cash
to Net Cash Provided by Operating Activities:
Depreciation and amortization
Provision for losses on accounts receivable
(Increase) in accounts receivable
Decrease in cost and earnings in excess
of billings on uncompleted contracts
Decrease in prepaid expenses and other receivables
(Increase) in other assets
Increase in accounts payable accrued expenses
Increase in income taxes payable
(Decrease) in deferred taxes payable
Total Adjustments
Net Cash Provided by Operating Activities
$
153,787
405,483
100,000
(1,431,505)
619,981
181,936
(105,150)
960,922
2,539
(93,000)
641,206
794,993
$
Read the independent accountants' compilation report and the notes to the financial statements.
4
, I
Metric Engineering, Inc. and Subsidiary
Notes to Consolidated Financial Statements
June 30, 2008
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I )(c).
1. Summary of Shmificant Accountinl! Policies
This summary of significant accounting policies of Metric Engineering, Inc. and Subsidiary (the
"Company") is presented to assist in understanding the Company's financial statements. These
accounting policies conform to U.S. generally accepted accounting principles ("GAAP") and have been
consistently applied in preparation of the financial statements.
Business Activity
Metric Engineering, Inc., a Florida corporation founded in July 1976, is a professional engineering firm
providing consulting services in the areas of planning, engineering, design, and implementation. The
Company's projects are specialized in consulting engineering.
Principles of Consolidation
The consolidated financial statements include the accounts of Metric Engineering, Inc. and its whol-
ly owned subsidiary, Dynamic Corporate Consultants, Inc. All significant intercompany transac-
tions and balances have been eliminated in consolidation.
Method of Accounting
The Company maintains its records on the cash basis. The accompanying financial statements reflect
such adjustments as necessary to present the financial statements in accordance with U.S. generally
accepted accounting principles. Consequently, these financial statements are presented on an accrual
basis.
Cash Equivalents
For the purposes of the statement of cash flows, cash equivalents are considered to be those time
deposits with a maturity of three months or less.
Property and Equipment
Property and equipment are carried at cost. Depreciation of property and equipment for financial
reporting purposes is provided using straight line and accelerated methods over the following estimated
useful lives:
Years
Furniture and fixtures
Field equipment
Auto and truck
Leasehold improvements
5-7
5-7
5-7
5 -15
Depreciation for tax purposes is provided by the Modified Accelerated Cost Recovery System
(MACRS). Expenditures for maintenance and repairs are expensed as incurred. Expenditures for
betterments and renewals are capitalized. The carrying amount of assets sold or retired and related
accumulated depreciation are eliminated from the accounts in the year of disposal and the resulting gain
or loss is included in income.
5
Metric Engineering, Inc. and Subsidiary
Notes to Consolidated Financial Statements
June 30, 2008
NOT FOR PUBLIC INSPECTIO;'\l / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I )(c).
1. Summary of Sie:nificant Accountine: Policies (continued)
Goodwill
The Company acquired Dynamic Corporate Consultants, Inc. ("Dynamic") under a stock purchase
agreement effective September 30, 2006 (See Note 2). Goodwill represents the excess of the
purchase price over the book value of Dynamic Corporate Consultants, Inc. In accordance with
GAAP, goodwill is not amortized since it has an indefinite life. Instead, it is tested annually for
impairment. During the year ended June 30, 2008, there was no change in the carrying amount of
goodwill.
Cash Value of Life Insurance
The Company is the owner and beneficiary of life insurance policies on several key officers. The cash
surrender value relative to the policies in place at June 30,2008 was $355,956.
Intangible Software Costs
Intangible software costs represent computer license costs that are accounted for at the lower of
unamortized costs or net realizable value. Accumulated amortization of intangible software costs of
$681,039 amounted to $498,856 as of June 30, 2008.
Revenue Recognition
The Company recognizes revenue on its professional services contracts on the actual cost plus allowed
D.O.T. (Department of Transportation) overhead rates and D.O.T. approved fixed fees and expense and
the percentage-of-completion method, measured by the percentage of billed and unbilled revenues to
date to estimated total revenue for each contract. These methods are used because management
considers them to be the best available measure of progress on these contracts since billings are done
monthly for all costs incurred the previous month. The asset "Costs and estimated eamings in excess of
billings" on uncompleted contracts represents revenues recognized in excess of amounts billed. Other
income includes collections from contract revenues that are non-recurring. Consequently, this income
has been shown below operating income.
Contract costs include all direct labor costs and those indirect cost related to contract performance, such
as indirect labor costs, subcontractors, truck and related expenses, materials and supplies, equipment
rentals, radios and telephone, rent, utilities, repairs and maintenance. Changes in job performance, job
conditions, and estimated profitability, including final contact settlements, may result in revisions to
cost and revenue and are recognized in the period in which the revisions are determined.
Estimates
The preparation of financial statements in conformity with U.S. generally accepted accounting
principles requires management to make estimates and assumptions that affect the reported amounts of
assets and liabilities and disclosure of contingent assets and liabilities at the date of the financial
statements and the reported amounts of revenues and expenses during the reporting period. Actual
results could differ from those estimates.
6
Metric Engineering, Inc. and Subsidiary
Notes to Consolidated Financial Statements
June 30, 2008
NOT FOR PUBLIC INSPECTION / DO NOT COpy
This tinancial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I)(c).
I. SUmmary of Sie:nificant AccountiDl! Policies (continued)
Income Taxes
Income taxes are provided for the tax effects of transactions reported in the financial statements and
consists of taxes currently due plus deferred taxes related primarily to differences between the basis of
current assets and current liabilities as reported on the cash basis for income tax purposes and on the
accrual basis used for financial statement presentation in accordance with U.S. generally accepted
accounting principles. The deferred tax assets and liabilities represent the future tax return
consequences of those differences, which will either be taxable or deductible when the assets and
liabilities are recovered or settled. Deferred tax assets are also recognized for operating losses that are
available to offset future taxable income.
New Pronouncements
In February 2006 F ASB issued Statement No. 155, Accounting for Certain Hybrid Financial Instru-
ments-an amendment ofFASB Statements No. 133 and 140. This Statement resolves issues addressed
in Statement 133 Implementation Issue No. D1, "Application of Statement 133 to Beneficial Interests in
Securitized Financial Assets." Adoption of this statement is not expected to have a significant effect on
the Company's results of operations or financial position.
In March 2006 FASB issued Statement No. 156, Accounting for Certain Hybrid Financial Instruments-
an amendment ofFASB Statements No. 133 and 140. This Statement resolves issues FASB Statement
No. 140, Accounting for Transfers and Servicing of Financial Assets and Extinguishments of Liabilities,
with respect to the accounting for separately recognized servicing assets and servicing liabilities. This
Statement requires an entity to recognize a servicing asset or servicing liability each time it undertakes
an obligation to service a financial asset by entering into a servicing contract and requires all separately
recognized servicing assets and servicing liabilities to be initially measured at fair value, if practicable.
Adoption of this statement is not expected to have a significant effect on the Company's results of oper-
ations or financial position.
In September 2006 FASB issued Statement No. 158, Employers' Accounting for Defined Benefit
Pension and Other Postretirement Plans-an amendment of FASB Statements No. 87, 88, 106, and
132(R). This Statement improves financial reporting by requiring an employer to recognize the over-
funded or underfunded status of a defined benefit postretirement plan (other than a multiemployer plan)
as an asset or liability in its statement of financial position and to recognize changes in that funded status
in the year in which the changes occur through comprehensive income of a business entity or changes in
unrestricted net assets of a not- for-profit organization. Adoption of this statement is not applicable to the
Company.
The Company has elected not to early-implement the following Statements issued by F ASB during 2006
and 2007. Effective dates for implementation ofthe following FASB Statements are in 2008 and 2009:
-Statement No. 157 - Fair Value Measurements
-Statement No. 141 - Business Combinations
-Statement No. 159 - The Fair Value Option for Financial Assets and Financial Liabilities-Including
an amendment ofFASB Statement No. 115
-Statement No. 160 - Noncontrolling Interests in Consolidated Financial Statements-an amendment
of ARB No. 51
7
Metric Engineering, Inc. and Subsidiary
Notes to Consolidated financial Statements
June 30, 2008
NOT FOR PUBLIC INSPECTION! DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I )(c).
2. ACQuisition of Dvnamic Corporate Consultants, Inc.
The Company entered into a stock purchase agreement with the shareholders of Dynamic to acquire
100% of the outstanding shares of Dynamic for a purchase price of $400,000 payable in installments of
$100,000 at closing and $100,000 installments due in May 2007, November 2007, and May 2008. Ad-
justments pursuant to the contract leave a zero balance due the shareholders of Dynamic at June 30,
2008.
At the time of closings the shareholders of Dynamic received 100% of the net assets of Dynamic
through an S Corporation distribution. Consequently, the purchase price was allocated by recording
$1,000 as an investment in Dynamic and $399,000 as goodwill recognized in the purchase. The Com-
pany received the assignment accounts receivable and furniture and equipment, and assumed certain
agreed upon liabilities. Total assets and liabilities received and assumed, respectively, amounted to ap-
proximately $400,219, as represented in Dynamic's corporate tax retum.
3. Prior Period Adiustments
In the year ended June 30, 2008 the Company posted prior period adjustments. In Metric the adjust-
ment was necessary to reconcile book and tax differences in fixed assets. The adjustment decreased
fixed assets and accumulated depreciation by a net amount of$15,138 and decreased retained eamings
by $15,138. Additionally, a prior period adjustment was also posted in the subsidiary to correct
amounts reported as liabilities. The adjustment decreased federal and state income taxes payable and
increased retained earnings by $63,804. At the consolidated level, the prior period adjustments
amounted to an increase of $48,666 to retained earnings.
4. Contracts Receivable and Concentration of Credit Risk
Financial instruments that potentially subject the Company to credit risk are primarily cash and accounts
receivable. The Company had $1,963,068 on deposits with various national financial institutions as of
June 30, 2008, insured for up to $100,000 per institution by the U.S. Federal Deposit lnsurance
Corporation. The Company believes it is not exposed to any significant credit risk on cash and cash
equivalents because the banks are large national enterprises, which are financially sound.
The Company provides engineering services principally to various governmental agencies under binding
contracts in the State of Florida and extends terms to these agencies. The Company estimated an
allowance for doubtful accounts due to exposure it faces on the jobs ongoing and believes it is not
exposed to any significant credit risk on contracts receivable. Contracts receivable consist of the
following at June 30, 2008:
Less allowance for doubtful accounts
9,925,100
207,183
10,132,283
130,000
10,002,283
Contracts receivable $
Retainages receivable
$
8
Metric Engineering, Inc. and Subsidiary
Notes to Consolidated Financial Statements
June 30, 2008
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
5. Property and Eauipment
Property and equipment consists of the following:
Furniture and fixtures
Field equipment
Auto and truck
Leashold improvements
Less accumulated depreciation
$ 919,021
1,451,310
307,224
629,278
3,306,833
(2,307,012)
$ 999,821
6. Lines of Credit
The Company maintains a revolving line of credit that is due on demand and bears interest at the
preferred rate announced by the lender, currently at 5.0%, for borrowings up to $1,000,000. The line is
secured by contracts receivable. The Company had a balance of $620,000 due on the line of credit at
June 30, 2008.
On June 26, 2008 the company issued a promissory note to Victor M Benitez for amounts advanced from
time to time up to a maximum outstanding principal balance of $800,000. The note has monthly interest
only payments beginning July 15, 2008. Principal and all accrued interest due at maturity. Interest is
accrued at the Metro Bank prime rate until July 15, 2009, after which time it may change. This note
matures in June 10,2009. At June 30, 2008 the unpaid principal balance is $292,000.
7. Notes Pavable
Long-term obligations included notes payable to a local bank. The note to the local bank has monthly
payments of principal, in the amount of $8,333, plus accrued interest began in March 2007. Principal
payments approximate $100,000 per year through maturity. During 2008 interest accrued at an annual
rate of 5.0%. This note matures in February 2012. At June 30, 2008 the unpaid principal balance
amounted to $366,667.
The Company entered into a stock purchase agreement with the shareholders of Dynamic to acquire
100% of the outstanding shares of Dynamic for a purchase price of $400,000 payable in installments of
$100,000 at closing and $100,000 installments due in May 2007, November 2007, and May 2008. At
June 30,2008 amount due to the shareholders of Dynamic had been paid off.
As of June 30, 2008, the company has installment agreements for equipment amounting to $34,735.
Payments of principal and interest are due monthly. The agreements mature within 2008 through 2010.
Commitments over the next five years are as follows:
Due June 30, 2009
Due June 30, 2010
Due June 30,2011
Due June 30, 2012
Total
Less: current maturities
Long term portion
100,000
100,000
100,000
66.667
366,667
100.000
$ 266.667
9
I
Metric Engineering, Inc. and Subsidiary
Notes to Consolidated Financial Statements
June 30, 2008
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I)(c).
8. Income Taxes
The company adopted FASB Statement No. 109 Accounting for Income Taxes. The principal book/tax
differences are the use of the percentage of completion method for revenue recognition, the methods of
depreciation and the use of the accrual basis discussed in Note I, reflected in the preparation of the
accrual basis financial statements compared to the completed contract method to recognize revenues, the
accelerated methods of depreciation allowed by the IRS and the cash basis of accounting used to
calculate taxable income. The IRS also requires amortization of goodwill over 15 years, however
goodwill was accounted for as investments in the tax retum and, consequently, not amortized.
9. Contract BackIol! and Contracts in Prol!ress
The following schedule summarizes changes in backlog on contracts during the year ended June 30,
2008. Backlog represents the amount of revenue the Company expects to realize from work to be
performed on uncompleted contracts in progress at the end of the period and from contractual
agreements on which work has not yet begun. The Company had the following approximate backlog of
contracts as of June 30, 2008:
Total contract fee
Less contract revenues earned to date
Backlog as of June 30, 2007
$ 98,593,762
45,829,717
$ 52,764,045
Estimated eamings in excess of billings on uncompleted contracts, representing services provided and
unbilled, total $1,230,489 for the year ended June 30, 2008.
10. Related Party Transactions
The Company has several office leases with related parties, (Metricor, Panametric and Tamiami Group).
Metricor sold the building in July 2007. The rent expense paid during the year and expirations of the
leases as of the year ended June 30, 2008 are as follows:
Description
Tamiami Group
Panametric
Metricor
June 30, 2008
$ 201,694
$ 52,002
$ 11,786
$ 265,482
Expiration
03/31/09
04/30/09
07/31/07
Additionally, the Company currently has over 230 leases with related parties (Better Leasing, Inc.) for
equipment and vehicles whose expiration range through 2009. The Company spent the following amount
on vehicles and equipment leasing during the year ended June 30, 2007:
Description
Vehicles
Equipment
June 30, 2008
$ 806,687
294,483
$ 1,101,170
10
Metric Engineering, Inc. and Subsidiary
Notes to Consolidated Financial Statements
June 30, 2008
NOT FOR PUBLIC INSPECTION / 00 NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
11. Pension Plan
The Company has a qualified 401 (k) plan which covers substantially all employees meeting certain
eligibility requirements. Participants may contribute a portion of their compensation to the plan, up to
the maximum amount permitted under Section 401(k) of the Internal Revenue Code. At the Company's
discretion, it can match a portion of the participants' contributions. The Company's matching
contribution was $147,287 for the year ended June 30, 2008.
12. Continl!encies
The Company, in the normal course of operations, is involved in alleged claims where both, the
Company and its clients, are negotiating the settlement or resolution of disputes. In these cases,
management does not believe the disposition of these matters will materially affect the financial position
of the Company.
11
Metric Engineering, Inc. and Subsidiary
Consolidated Schedules of Direct Costs and General and Administrative Expenses
For the Year Ended June 30, 2008 NOT FOR PUBLIC INSPECTION! DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Direct Costs:
Salaries-productive
Outside services-projects
Other direct expenses
Field vehicle expenses
Field office expenses
Total Direct Costs
General and Administrative Expenses:
Salaries-administrati ve
Salaries-other
Insurance-other
Payroll taxes
Salaries-vacation, holiday and sick days
Office rent
Vehicle expense
Professional fees
Office equipment maintenance, lease and supplies
Salaries-bonus
Depreciation and amortization
Computer service
Drafting and office supplies-general
Telephone and telegraph-general
Legal and accounting
Travel-general
Training and seminars
Pension expense
Bad debt
Employee benefits
Entertainment
Dues and subscriptions
Contributions
Utilities
Postage and freight
Insurance-life
Taxes and licenses
Miscellaneous
Total General and Administrative Expenses
$
10,559,144
7,384,989
1,256,349
1,599,056
744,797
21,544,335
$
$
3,506,129
2,134,137
2,216,997
1,289,432
1,271,991
1,044,489
644,097
816,909
562,687
579,327
405,483
254,922
197,700
212,504
123,113
186,591
105,230
147,287
100,000
44,875
62,501
44,680
27,218
36,281
41,3 18
62,042
37,356
66,973
16,222,269
$
Read the independent accountants' compilation report and the notes to the financial statements.
12
r I
; I
: I
! I
r I
[1
[ I
: I
: ]
i I
; ]
!
L
;, ]
~I
: I
~ 1
, I
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection. Or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Metric Engineering, Inc. and Subsidiaries
Consolidated Financial Statements
June 30,2009
In~~:~~~RT&C
I{OI )Rh;IIU..I"I<lII.l\:\ I'- ('( J, .1',\
CERTIfiED rueLlC ACCOUNrANTS
NOT FOR PUBLIC INSPECTIO;'\l / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I)(c).
~ I
I : I
f I
r I
Metric Engineering, Inc. and Subsidiaries
Consolidated Financial Statements
June 30, 2009
: I
CONTENTS
!
Independent Accountants' Review Report 1
i I Consolidated Financial Statements:
Consolidated Balance Sheet 2
r ] Consolidated Statement of Operations and Retained Earnings 3
Consolidated Statement of Cash Flows 4
( I Notes to Consolidated Financial Statements 5 - 12
Supplementary Schedule:
, I Consolidated Schedule of Direct Cost and
I ] General and Administrative Expenses 13
, I
: I
L I
.1
II
; I
~ ]
; I
IIIIIIIR~ C
.'9.'....,,1,..
\,~:;'.i'.i.'";",';
I~'""~.'~,....,...
"".:::.~~~;::;:~;: . & ..
~';'i'T."';',';';~n'-,1I'~
RODR}(;ULZ,TRLlEBA & CO. ,P!\
CERTIFIED PUBLIC ACCOUNTANTS
:-';OT FOR PUBLIC I;'\lSPECTIO;'\l / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I )(c).
: I
INDEPENDENT ACCOUNTANTS' REVIEW REPORT
I J
r I
I
I
To the Board of Directors
Metric Engineering, Inc. and Subsidiaries
Miami, Florida
I
I
I
r I
:J
~ 1
I 1
L j
We have reviewed the accompanying consolidated balance sheet of Metric Engineering,
Inc. and Subsidiaries (a group of Florida corporations) (the "Company") as of June 30,
2009, and the related consolidated statements of operations and retained earnings and cash
flows for the year then ended, in accordance with Statements on Standards for Accounting
and Review Services issued by the American Institute of Certified Public Accountants. All
information included in these consolidated fmandal statements is the representation of the
management of the Company.
A review consists principally of inquiries of the Company personnel and analytical
procedures applied to financial data. It is substantially less in scope than an audit in
accordance with U.S. generally accepted auditing standards, the objective of which is the
expression of an opinion regarding the consolidated financial statements takes as a whole.
Accordingly, we do not express such an opinion.
Based on our review, we are not aware of any material modifications that should be made
to the accompanying consolidated fmancial statements in order for them to be in
conformity with U.S. generally accepted accounting principles.
Our review was made for the purpose of expressing limited assurance that there are no
material modifications that should be made to the fmancial statements in order for them to
be in conformity with U.S. generally accepted accounting principles. The information
included in the accompanying Schedule on page 13 is presented only for supplementary
analysis purposes. Such information has been subjected to the inquiry and analytical
procedures applied in the review of the basic financial statements, and we are not aware of
any material modifications that should be made thereto.
~ ]
l]
R<J~~, r~ t& (}o~
Rodriguez, Trueba & Company, P A
Doral, Florida
December 31, 2009
DoraI Office: 1985 NW 8811 Court, Sune 101, Doral, FL 33172. Phone: 305-593-2644, Fax: 305-593-0390
'-taml-Lakes Office: 8040 SW 155'" Sl., Suite 206, Miami Lakes, FL 33016, Phone: 305-779-1120 . Fax: 305-779-1121
WWN.rI<>CD8.com
Member of the American Instilule of Certified Public Accountants . Member of !he Florida Institute of Certified Public Accountants
r I
Metric Engineering, Inc. and Subsidiaries
Consolidated Balance Sheet
June 30. 2009
NOT FOR PUBLIC I;'\lSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I)(c).
~ I
r I
ASSETS
Current Assets
Cash and cash equivalents $ 1,029,891
Net contracts and retainages receivable 11,489,909
Cost and estimated earnings in excess of billings 1,058,465
Receivable from employees and related parties 214,736
Short-term deferred tax asset 773,897
Total Current Assets 14,566,898
Certificate of Deposit 500,000
Property and Equipment - net of depreciation 842,074
Other Assets
Goodwill 512,334
Intangible software costs - net 153,452
Prepaid expenses 314,551
Cash surrender value oflife insurance policies 314,376
Security deposits 93,277
Total Other Assets 1,387,990
Total Assets $ 17,296,962
r 1
iHI
l]
LIABILITIES AND STOCKHOLDERS' EQUllY
Current Liabilities
Line of credit
Notes payable - current portion
Accounts payable
Accrued expenses
Short-term deferred tax liability
Total Current Liabilities
$
950,000
162,452
1,199,120
854,556
5,049,309
8,215,437
Note Payable
Total Liabilities
175,437
8,390,874
Minority Interest in Consolidated Subsidiary
99,546
r I
L
Stockholders' Equity
Common stock, $10 par value, 100 shares authorized,
issued and outstanding
Capital contributed in excess of par value
Treasury stock
Retained earnings
Total Stockholders' Equity
1,000
10,600
(192,000)
8,986,942
8,806,542
L
Total Liabilities and Stockholders' Equity
$
17,296,962
~ I
L I
Read the independent accountants' review report and the notes to the financial statements.
2
I
~ I
~ ]
[ I
[ I
; I
l'iOT FOR PUBLIC I;'\lSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
M . E' . I dS b'd' . Statutes 119.071 (I)(c).
etrlc ngmeermg, nc. an U Sl larles
Consolidated Statement of Operations and Retained Earnings
For the Year Ended June 30, 2009
ContractRevenues~ed
Direct Cost
Gross Margin
$
40,579,620
22,235,693
18,343,927
General and Administrative expenses
Operating Income
16,028,622
2,315,305
II
Other Income and (Expenses)
Interest income
Other income
Interest expense
Total Other Income and (Expenses)
Income Before Income Taxes
30,026
45,600
(33,590)
42,036
2,357,341
i I
I
Income Taxes
Currently payable
Deferred
Total
(182,272)
(698,787)
(881,059)
1,476,282
7,510,660
$ 8,986,942
I
I
! I
Net Income
Retained Earnings - July 1, 2008
Retained Earnings - June 30, 2009
[I
[I
: I
; j
~, j
. I
l j
Read the independent accountants' review report and the notes to the [mancial statements.
3
, j
. L
1< I
I
~ I
NOT FOR PUBLIC INSPECTIOJ" / DO NOT COPY
This tinancial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Metric Engineering, Inc. and Subsidiari~tutes 119.071 (I) (c).
Consolidated Statement of Cash Flows
For the Year Ended June 30, 2009
: I
Cash Flows from Operating Activities:
Cash received from contract revenues
Cash paid to suppliers and employees
Income taxes paid
Interest paid
Interest earned
Net Cash Provided by Operating Activities
$ 39,221,236
(38,908,266)
(13,638)
(33,590)
30,026
295,768
l]
[ I
Cash Flows from Investing Activities:
Investment in Certificate of Deposit
Investment in A TEC
Purchase of equipment, leasehold improvements, and
and computer software
Net Cash (Used in) Investing Activities
Net (Decrease) in Cash and Cash Equivalents
(411,416)
(195,000)
(35,937)
(642,353)
71,978
(63,513)
330,000
338,465
(8,120)
1,038,011
$ 1,029,891
~ ]
:1
[ I
; I
~ I
! I
I
II
r I
L,
~ I
~ 1
J
~ 1
Cash Flows from Financing Activities:
Proceeds from long term debt
Payments of long term debt
Net borrowings
Net Cash Provided by Financing Activities
Cash and Cash Equivalents at July 1, 2008
Cash and Cash Equivalents at June 30, 2009
Reconciliation of Net Income to Net Cash
Provided by Operating Activities
Net Income
Adjustment to Reconcile Net Income to Net Cash
to Net Cash Provided by Operating Activities:
Depreciation and amortization
(Increase) in accounts receivable
Decrease in cost and earnings in excess
of billings on uncompleted contracts 172,024
(Increase) in prepaid expenses and other receivables (177,599)
Decrease in other assets 89,217
(Decrease) in accounts payable accrued expenses (975,600)
(Decrease) in income taxes payable (11,159)
Increase in deferred taxes payable 878,580
Total Adjustments (1,180,514)
Net Cash Provided by Operating Activities $ 295,768
Read the independent accountants' review report and the notes to the financial statements.
4
$
1,476,282
331,649
(1,487,626)
i 'I'
I ,
; 1
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Metric Engineering, Inc. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
[I
1. Summary of Shmificant Accounting: Policies
f1
r I
This summary of significant accounting policies of Metric Engineering, Inc. and Subsidiaries (the
"Company") is presented to assist in understanding the Company's financial statements. These
accounting policies conform to U.S. generally accepted accounting principles ("GAAP") and have
been consistently applied in preparation of the financial statements.
Business Activity
r I
Metric Engineering, Inc., a Florida corporation founded in July 1976, is a professional engineering
firm providing consulting services in the areas of planning, engineering, design, and implementation.
The Company's projects are specialized in transportation engineering.
~ I
Princioles of Consolidation
The consolidated fmancial statements include the accounts of Metric Engineering, Inc., its wholly
owned subsidiary, Dynamic Corporate Consultants, Inc, and its majority owned subsidiary, Ad-
vanced Transportation Engineering, Inc ("A TEC"). All significant intercompany transactions and
balances have been eliminated in consolidation.
Method of Accounting
I I
These financial statements are presented on an accrual basis, which recognizes revenues when earned
and expenses when incurred.
Cash Equivalents
For the purposes of the statement of cash flows, cash equivalents are considered to be those time
deposits with a maturity of three months or less.
: I
~ I
Prooertv and Eauipment
: I
Property and equipment are carried at cost. Depreciation of property and equipment for financial
reporting purposes is provided using straight line and accelerated methods over the following
estimated useful lives:
II
Furniture and fixtures
Field equipment
Auto and truck
Leasehold improvements
Years
5-7
5-7
5-7
5 -15
~ I
~ I
Depreciation for tax purposes is provided by the Modified Accelerated Cost Recovery System
(MACRS). Expenditures for maintenance and repairs are expensed as incurred. Expenditures for
betterments and renewals are capitalized. The carrying amount of assets sold or retired and related
accumulated depreciation are eliminated from the accounts in the year of disposal and the resulting
gain or loss is included in income.
~ j
J
II
5
, I
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Metric Engineering, Inc. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
! I
1. Summary of Sienificant Accountine Policies (continued)
r I
Goodwill
The Company acquired Dynamic Corpomte Consultants, Inc. ("Dynamic") and Advanced
Transportation Engineering, Inc ("A TEC") under stock purchase agreements effective September
30, 2006 and October 31, 2008, respectively. Goodwill represents the excess of the purchase
price over the book value of the acquired entity. In accordance with GAAP, goodwill is not
amortized since it has an indeftnite life. Instead, it is tested annually for impairment. During the
year ended June 30, 2009, there was no change in the carrying amount of goodwill.
Cash Value of Life Insurance
The Company is the owner and beneficiary of life insurance policies on several key officers. The cash
surrender value relative to the policies in place at June 30, 2009 was $314,376.
Intangible Software Costs
Intangible software costs represent computer license costs that are accounted for at the lower of
unamortized costs or net realizable value. Accumulated amortization of intangible software costs of
$744,612 amounted to $591,160 as of June 30, 2009.
Revenue Recognition
The Company recognizes revenue on its professional services contracts on the percentage-of-
completion method, measured by the percentage of billed and unbilled revenues to date to estimated
total revenue for each contract. Revenues are calculated using the actual cost plus allowed Department
of Transportation ("D.O.T") overhead rates and D.O.T. approved fixed fees and expense. These
methods are used because management considers them to be the best available measure of progress on
these contracts since billings are done monthly for all costs incurred the previous month. The asset
costs and estimated earnings in excess of billings on uncompleted contracts represent revenues
recognized in excess of amounts billed. Other income includes collections from contract revenues
that are non-recurring. Consequently, this income has been shown below operating income.
! I
Contract costs include all direct labor costs and those indirect cost related to contract performance,
such as indirect labor costs, subcontractors, truck and related expenses, materials and supplies,
equipment rentals, radios and telephone, rent, utilities, repairs and maintenance, and related sales tax
expense. Changes in job performance, job conditions, and estimated profitability, including final
contact settlements, may result in revisions to cost and revenue and are recognized in the period in
which the revisions are determined.
: j
Estimates
~ 1
The preparation of financial statements in conformity with GAAP requires management to make
estimates and assumptions that affect the reported amounts of assets and liabilities and disclosure of
contingent assets and liabilities at the date of the financial statements and the reported amounts of
revenues and expenses during the reporting period. Actual results could differ from those estimates.
J
:_1
6
~ I
r]
! I 1.
II
[ I
[ I
[ I
; I
[ I
II
! J
~ I
; j
~ ]
: 1
~ ]
!'lOT FOR PUBLIC INSPECTIO;'\l / DO ;'\lOT COPY
This tinancial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Metric Engineering, Ine. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
Summary of Sh!Dificant Accounting Policies (continued)
Income Taxes
Income taxes are provided for the tax effects of transactions reported in the financial statements and
consists of taxes currently due plus deferred taxes related primarily to differences between the basis of
current assets and current liabilities as reported on the cash basis for income tax purposes and on the
accrual basis used for financial statement presentation in accordance with u.s. generally accepted
accounting principles. The deferred tax assets and liabilities represent the future tax return
consequences of those differences, which will either be taxable or deductible when the assets and
liabilities are recovered or settled. Deferred tax assets are also recognized for operating losses that are
available to offset future taxable income.
New Pronouncements
During September 2006 FASB issued Statement Number 157 - Fair Value Measurements to define
fair value, establishes a framework for measuring fair value in generally accepted accounting
principles (GAAP), and expand disclosures about fair value measurements. The Statement provides a
single definition of fair value, together with a framework for measuring fair value that results in
increased consistency and comparability in fair value measurements. The amendments made by this
Statement advance the initiatives to simplify the accounting literature, eliminating differences that
have added to the complexity in GAAP. The statement is applicable for years beginning in 2008.
During February 2007 FASB issued Statement Number 159 - The Fair Value Option for Financial
Assets and Financial Liabilities-including an amendment of FASB Statement No. 115 that permits
entities to choose to measure many financial instruments and certain other items at fair value. The
objective is to improve financial reporting by providing entities with the opportunity to mitigate
volatility in reported earnings caused by measuring related assets and liabilities differently without
having to apply complex hedge accounting provisions. This Statement is expected to expand the use
of fair value measurement, which is consistent with the Board's long-term measurement objectives for
accounting for financial instruments, and the issuance of Statement Number 157 - Fair Value
Measurements discussed above.
During December 2007 FASB revised Statement Number 141 - Business Combinations to improve
the relevance, representational faithfulness, and comparability of the information that a reporting
entity provides in its financial reports about a business combination and its effects. This Statement
establishes principles and requirements for how the acquirer recognizes and measures in its financial
statements the identifiable assets acquired, the liabilities assumed, and any non-controlling interest in
the acquire, measures goodwill or a gain from a bargain purchase and expands disclosures to evaluate
the nature and financial effects of the acquisition. This Statement applies to all transactions or other
events in which an entity (the acquirer) obtains control of one or more businesses (the acquirer),
including those sometimes referred to as "true mergers" or "mergers of equals" and combinations
achieved without the transfer of consideration. This Statement applies to all business entities,
including mutual entities that previously used the pooling-of-interests method of accounting for some
business combinations.
7
r I
NOT FOR PUBLIC INSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection, or copying of public records pursuant to Florida
Statutes 119.071 (I)(c).
Metric Engineering, Inc. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
~ I
r I
1. Summary of Shmificant Accountine Policies (continued)
r 1
New Pronouncements - continued
r I
In May 2008 F ASB Issued Statement Number 162 - The Hierarchy of Generally Accepted
Accounting Principles, to identify the sources of accounting principles and the framework for
selecting the principles to be used in the preparation of financial statements of nongovernmental
entities that are presented in conformity with GAAP in the United States (the GAAP hierarchy). The
current GAAP hierarchy, as set forth in the American Institute of Certified Public Accountants
(AICP A) Statement on Auditing Standards No. 69, The Meaning of Present Fairly in Conformity
With Generally Accepted Accounting Principles, has been criticized because (1) it is directed to the
auditor rather than the entity, (2) it is complex, and (3) it ranks FASB Statements of Financial
Accounting Concepts, which are subject to the same level of due process as F ASB Statements of
Financial Accounting Standards, below industry practices that are widely recognized as generally
accepted but that are not subject to due process. The Board believes that the GAAP hierarchy should
be directed to entities because it is the entity (not its auditor) that is responsible for selecting
accounting principles for financial statements that are presented in conformity with GAAP.
Accordingly, the Board concluded that the GAAP hierarchy should reside in the accounting literature
established by the F ASB and is issuing this Statement to achieve that result.
r I
The Company has elected not to early-implement the following Statements issued by F ASB during
2009. Effective dates for implementation of Statement No. 160 - Noncontrolling Interests in
Consolidated Financial Statements-an amendment of ARB No. 51 are in 2010:
2. ACQuisition of Advanced Transportation Enl!ineerinl! Consultants. Inc.
The Company entered into a stock purchase agreement with the shareholders of Advanced Transpor-
tation Engineering Consultants (ATEC) to acquire 55% of the outstanding shares of ATEC (5% from
Elio R. Espino and 50% from Javier S Gonzalez) for a purchase price of $235,000; $152,000 payable
in cash at the time closing of the transaction and the remaining balance payable in installments of
$10,000 per month starting February 28, 2008 for Elio R. Espino and November 28,2008 for Javier
S. Gonzalez.
[1
At the time of closing the equity of ATEC amounted to approximately $221,212. Consequently, the
purchase price was allocated by recording $221,212 as an investment in ATEC, $99,546 as minority
interest in subsidiary (representing the 45% owned by Elio R. Espino) and $113,333 as goodwill rec-
ognized in the purchase. As a part of the purchase a consulting agreement in the amount of $120,000
was reached with Javier Gonzalez
: I
~ J
l j
~ J
~ I
8
r]
~-l
NOT FOR PUBLIC Il'iSPECTION / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I )(c).
Metric Engineering, Ine. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
II
2. Acauisition of Advanced Transportation Emrlneering: Consultants. Inc. (continued)
~ I
The following summarizes ATEC's Balance Sheet at the time of acquisition and the calculation of
goodwill:
r I
Current Assets
Cash and cash equivalents
Contracts receivable
Property & Equipment - net of accumulated depreciation
Other Assets
Loan receivable - related party
Other assets
Total Assets
Current Liabilities
Accounts payable and accrued expenses
Long-Term Liabilities
Long-term debt including capital leases
Total Liabilities
$
33,015
37,835
58,138
l ]
197,504
8,264
334,756
$
II
83,951
! ]
f ]
Net Assets Acquired at Fair Market Value
29,593
113,544
221,212
$
Total Cost of Acquistion
Net Assets Acquired at Fair Market Value (55%)
Goodwill
$
235,000
121,667
113,333
$
3. Contracts Receivable and Concentration of Credit Risk
II
Financial instruments that potentially subject the Company to credit risk are primarily cash and
accounts receivable. The Company had $1,789,142 on deposits with various national financial
institutions as of June 30, 2009, which were insured for up to $250,000 per institution by the U.S.
Federal Deposit Insurance Corporation. The Company believes it is not exposed to any significant
credit risk on cash and cash equivalents because the banks are large national enterprises, which are
financially sound.
l]
~ I
The Company provides engineering services significantly concentrated in various governmental
agencies in the South Florida under binding contracts, and extends terms to these agencies. The
Company estimated an allowance for doubtful accounts due to exposure it faces on the jobs ongoing
and believes it is not exposed to any significant credit risk on contracts receivable. Contracts receivable
consist of the following at June 30,2009:
~ ]
~ j
Contracts receivable $
Retainages receivable
11,402,723
217,186
11,619,909
130,000
11,489,909
Less allowance for doubtful accounts
'1
$
L ]
9
r I
: I
) I
r I
i I
r I
[ I
i J
[ I
il
[ ]
! I
[ 1
IJ
~ ]
; J
: ]
:_1
L J
NOT FOR PUBLIC INSPECTIO:\' / DO NOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Metric Engineering, Inc. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
4. Contracts in Pro2ress
Estimated earnings in excess of billings on uncompleted contracts, representing services provided and
unbilled, total $1,058,465 for the year ended June 30, 2009.
5. ProDertv and EquiDment
Property and equipment consists of the following:
Furniture and fixtures
Field equipment
Auto and truck
Leashold improvements
$ 956,753
1,608,985
345,671
605,762
3,517,171
(2,675,097)
$ 842,074
Less accumulated depreciation
6. Lines of Credit
The Company maintains a revolving line of credit for borrowings up to $1,000,000 that is due on
demand and bears interest at the preferred rate announced by the lender, currently at 3.25%. The line
is secured by contracts receivable with a carrying amount of 11,489,909 (Note 3). The Company had a
balance of $950,000 due on the line of credit at June 30, 2009.
7. Notes Payable
Long-term obligations include a note payable to a local bank. Monthly payments of principal, in the
amount of $8,333, plus accrued interest began in March 2009. Principal payments approximate
$100,000 per year through maturity in February 2012. During 2009 interest accrued at an annual rate
of 3.25%. At June 30, 2009 the unpaid principal balance amounted to $266,667.
The Company entered into a stock purchase agreement with the shareholders of Advanced
Transportation Engineering Consultants (ATEC) to acquire 55% of the outstanding shares of ATEC
(5% from Elio R. Espino and 50% from Javier S Gonzalez) for a purchase price of $235,000; $152,000
payable in cash at closing of the transaction and the remaining balance payable in installments of
$10,000 per month starting February 28,2008 for Elio R. Espino and November 28,2008 for Javier S.
Gonzalez. As of June 30, 2009, $40,000 is due to Javier Gonzalez.
As of June 30, 2009, the company has installment agreements for equipment amounting to $28,856,
secured by the related equipment. Payments of principal and interest are due monthly. The agree-
ments mature within the next three years. Commitments over the next five years are as follows:
Due June 30, 2010
Due June 30, 2011
Due June 30, 2012
Total
Less: current maturities
Long term portion
$ 162,452
112,234
63.203
337,889
162.452
$ 175.437
10
'-I
~ I
~ 1
NOT FOR PUBLIC Il\;SPECTIO;'\l/ DO ;'\lOT COPY
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I )(c).
Metric Engineering, Inc. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
8. Income Taxes
: I
The Company recognizes deferred tax assets and liabilities based on the future tax consequences of
events that have been included in the consolidated financial statements or tax returns. The differences
related primarily to the use of the percentage of completion method for revenue recognition, the
methods of depreciation and the use of the accrual basis discussed in Note 1, reflected in the
preparation of the accrual basis fmancial statements compared to the completed contract method to
recognize revenues, the accelerated methods of depreciation allowed by the IRS and the cash basis of
accounting used to calculate taxable income. The IRS also requires amortization of goodwill over 15
years, amortization expense in the 2009 tax return amounted to $32,267 and accumulated amortization
amounted to $58,867.
: ]
r I
Deferred tax assets and liabilities are calculated based on the difference between the financial reporting
and tax bases of assets and liabilities using the currently enacted tax rates in effect during the years in
which the differences are expected to reverse. Deferred taxes are classified as current or non-current,
depending on the classification of the assets and liabilities to which they relate.
1/
The Company's provision for income taxes differs from applying the statutory U.S. federal income tax
rate to income before taxes. The primary differences result from providing for state income taxes and
from deducting certain expenses for financial statement purposes but not for federal income tax
purposes.
[I
[ /
In accordance with the Statement of Financial Accounting Standards, ("FAS") No. 109, Accounting
for Income Taxes ("F AS 1 09"), a valuation allowance is established based on the future recoverability
of deferred tax assets. This assessment is based upon consideration of available positive and negative
evidence, which includes, among other things, our most recent results of operations and expected
future profitability.
: ]
[ ]
The computation of deferred assets is as follows:
[I
I j
Deferred Tax Liability
Accounts and retainages receivable
Uncompleted contracts
Other assets
$ 4,533,471
408,355
107,483
$ 5,049,309
~- ]
Deffered Tax Asset
Accounts payable
Other accruals
$ 463,908
309,989
$ 773,897
~ I
J
: 1
:,]
11
10;-
~ I
I
I
1
I
[ 1
11
11
11
l]
[1
II
u
~ J
~]
J
J
I
NOT FOR PUBLIC INSPECTIO;'\l / DO NOT COpy
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Statutes 119.071 (I) (c).
Metric Engineering, Inc. and Subsidiaries
Notes to Consolidated Financial Statements
June 30, 2009
9. Contract Backlol! and Contracts in Prol!ress
The following schedule summarizes the backlog on contracts requires beginning backlog at June 30,
2009. Backlog represents the amount of revenue the Company expects to realize from work to be
performed on uncompleted contracts in progress at the end of the period and from contractual
agreements on which work has not yet begun. The Company had the following approximate backlog
of contracts as of June 30, 2009:
Total contract fee
Less contract revenues earned to date
Backlog as of June 30, 2009
$ 114,857,576
66,782,714
$ 48,074,862
10. Related Party Transactions
The Company has office leases with related parties, (Tamiami Group and Parametric). The amounts
and expirations of the leases as of the year ended June 30,2009 are as follows:
Description
Tamiami Group
Panametric
Expiration
03/31/10
04/30/12
$
$
$
164,028
162,945
326,973
Additionally, the Company currently has over 230 leases with related parties for equipment and
vehicles whose expiration range from 2010 through 2012. The Company spent $629,057 on vehicle
leasing and $204,140 on equipment leasing during the year ended June 30, 2009. The amounts and
expirations of the equipment and vehicle leases as of the year ended June 30, 2009 are as follows:
2010
2011
2012
$
633,182
377,134
201,056
1,211,372
$
11. Pension Plan
The Company has a qualified 401(k) plan which covers substantially all employees meeting certain
eligibility requirements. Participants may contribute a portion of their compensation to the plan, up to
the maximum amount permitted under Section 401(k) of the Internal Revenue Code. At the
Company's discretion, it can match a portion of the participants' contributions. The Company's
matching contribution was $148,921 for the year ended June 30, 2009.
12. Contine:encies
The Company, in the normal course of operations, is involved in alleged claims where both, the
Company and its clients, are negotiating the settlement or resolution of disputes. In these cases,
management does not believe the disposition of these matters will materially affect the financial
position of the Company.
12
C I
r ]
: I
NOT FOR PUBLIC INSPECTION / DO NOT COpy
This financial statement is private and exempt from public
inspection. or copying of public records pursuant to Florida
Metric Engineering, Inc. and Subsidiarieitatutes 119.071 (I)(c).
Consolidated Schedule of Direct Cost and Geneml and Administrative Expenses
For the year ended June 30, 2009
[ I
Direct Costs:
Salaries-productive
Outside services-projects
Field vehicle expenses
Other direct expenses
Field office expenses
Total Direct Expenses
$ 11,697,338
6,920,732
1,633,190
1,330,118
654,315
$ 22,235,693
[ I
i I
[ I
J
[I
General and Administrative Expenses:
Salaries-administrative
Salaries-vacation, holiday and sick days
Salaries-other
Salaries-bonus
Insurance-other
Payroll taxes
Office rent
Professional fees
Vehicle expense
Office equipment maintenance, lease and supplies
Computer service
Depreciation and amortization
Drafting and office supplies-general
Telephone and telegraph-general
Travel-general
Pension expense
Legal and accounting
Insurance-life
Training and seminars
Taxes and licenses
Dues and subscriptions
Bad debt
Employee benefits
Entertainment
Utilities
Postage and freight
Contributions
Miscellaneous
Bank charges
Total General and Administrative Expenses
$ 3,385,146
1,614,202
1,579,439
1,028,067
1,645,408
1,344,952
1,241,289
826,931
562,438
507,730
417,268
331,649
192,475
170,000
160,346
148,921
141,151
99,725
93,168
87,586
86,512
76,139
67,978
56,216
48,879
44,012
38,123
17,760
15,112
$ 16,028,622
I
I
[ I
[ I
r I
[I
~ I
~ I
~1
~ I
Read the independent accountants' review report and the notes to the financial statements.
13