HomeMy WebLinkAboutCPH
~
l
~
~
~
1Dr;;
II
~,,~
RECEIVED
MAY 2 ~.jQ1.~~01fr"
CITY OF SUNNmrES BEACH
OFFICE OF THE CITY CLERK
~~'
...,...---
-, ..,..
,~. ~'-','1
'.....
'1
I'
~ _ -.,..~.....:~\.t.-
,.~-
~ ':'llI
'""
=
o:l
l::'"
~
\..
@!EtUtJ
1992 SW 1st Street . Miami, Florida 33135 . Phone: 305.274.4805
I
May 25, 2010
City of Sunny Isles Beach
18070 Collins A venue, First Floor Meeting Room
Sunny Isles Beach, Florida, 33160
1992 SW 1'1 Street
Miami, Florida 33135
Phone: 305.274.4805
Fax: 305.274.4807
I [II [Ill'. cp hCII gill cc rs. co 111
Re: Professional Engineering Services
RFQ # 10-04-0 I
Dear Selection Committee Members:
CPH Engineers, Inc. (CPH) is pleased to respond to the City of Sunny Isles Beach's Request for
Qualifications for the Professional Engineering Services contract. It would be our pleasure to provide
services to the City. We are certain that CPH exceeds the City of Sunny Isles Beach's qualification
requirements for the following reasons:
· Capabilities: CPH is a multi-disciplinary engineering firm recognized for providing superior
quality services to our clients in an efficient and effective manner. CPH has been providing
consulting services for over 28 years; we believe that this experience is imperative to successfully
execute the wide variety of projects that this contract may bestow. With a local office in Miami and
support staff members in Orlando and Sanford; CPH is eager and ready to provide services for any
project under this contract.
· Experience: CPH has assembled a vastly diverse and highly qualified team with experience in all
discipline areas requested by the City. Our team is capable of providing services for every project
that will emerge under this contract. CPH realizes and understands that each project has its
individual characteristics and will need specialized expertise. Therefore, CPH has assembled a team
composed of engineers, environmental scientists, contractors, inspectors, surveyors, and
administrative staff; which will bring a significant assortment of knowledge to the contract. CPH
has experience in areas such as: roadway design, stomwater management, water and wastewater
treatment, utility design, structural analysis, transportation, planning, and environmental services.
· Experience Working Under Continuing Contracts: We have worked with many of our clients
for 30 years. These long-term relationships have afforded us many opportunities to meet our
clients' needs and perform municipal engineering services. Our team has extensive experience in
working under continuing contracts and is available for planned projects as well as unplanned
emergencies. We are currently serving the municipalities of Punta Gorda, North Port, Tampa, Lake
Alfred, Daytona Beach, Palm Coast, Edgewater, Orlando, Sanford, Casselberry, Winter Springs,
Lake Mary, Oviedo, Eustis, Titusville, Cape Coral, Deland, and Fort Myers; Volusia, Lee, and
Orange Counties; and the V olusia, Seminole, Lake, and Polk County School Districts, as their
Continuing Services Engineer. We are very proud of our continuing relationships.
We appreciate the opportunity to submit our qualifications and look forward to working with the City of
Sunny Isles Beach.
Sincerely,
CPH Engineers, Inc.
/
t. c~.... ,__ ",...,,;::.- /~_7r-
David A. Gierach, P.E.lPresident
./
Professional Engineering Services, RFQ No. 10-04.01
Table of Contents
1. Required Information
2. SF 330
3. Forms
~.
I'rofessional Engineering Services, RFQ No. 1lI-04-01
Vo[usia County - Spring Hill Park/Trail
Corporate OverviewlHistory
CPH is recognized as one of the nation's top 500 engineering firms (as ranked by ENR Magazine) a
direct result of the efforts of our staff and our successful relationship with our clients. Our ability to
incorporate learned experiences and procedures into our operations helps our clients get the best product
for their needs. Our level of repeat business speaks volumes to the satisfaction factor enjoyed by our
clients.
Legal Name of Firm
CPH Engineers, Inc.
Firm AddresslInformation
Primary O./fice
CPH Miami
1992 SW I sl Street
Miami, Florida 33135
Phone: 305.274.4805
Fax: 305.274.4807
Federal Taxpayer Identification Number
59-2068806
Support O./tlce
CPH Port St. Lucie
540 NW University Blvd., Suite 209
Port St. Lucie, Florida 34986
Phone: 772.283.8704
Fax: 772.283.4681
Type of Firm
Corporation (Since 1981)
Principals With Authority To Bind Firm
David Gierach, P.E./President
Todd H. Hendrix, P.E /Vice President
Date and Location of Incorporation
CPH Engineers, Inc. (CPH) has been providing consulting services since the 1960's in Florida and was
established as a Florida Corporation since 1981.
~d
Professional Engineering Services, RFQ No. 10-04-01
Corporate Overview
CPH Engineers, Inc. (CPH) prides itself in its capability to
"provide quality and innovation for design and
construction." In every aspect of the business, CPH takes
pride in providing timely, cost effective and appropriate
engineering services to support its clients and help them
achieve their objectives.
Known as a leading multi-disciplinary consulting
engineering firm, CPH provides services in the following
areas: Master Planning, Engineering Services (Civil and
Utili ties), Architectural Services/Landscape Arch i tecture,
W ater/W astewater/Reclaimed/ Stormwater Systems,
Hydraulics and Hydrology, Environmental Sciences,
Transportation engineering including traffic planning and
design, Land Planning/Zoning, Construction Engineering
and Inspection/Construction Management, Design/Build,
Surveying & Mapping, and Graphic Design.
The Firm has been providing services in the area since the
1960' s and the Firm has been established since 1981 as a
privately-owned Florida Corporation. In keeping with the
company's philosophy to assure responsive and cost
effective service, CPH has grown with branch offices
housing approximately 300 employees in Florida,
Connecticut, Texas, Maryland, and Puerto Rico; with the
firm's Corporate Headquarters located in Sanford, Florida.
CPH's commitment to providing the highest level of service
in an affordable manner has been achieved through
emphasis on personalized services and direct involvement
of top level CPH personnel, especially the owners of the
corporation.
Annual Revenue for the Past Two Years
2008: $ 43,549,978
2009: $ 27,374,879
~.a
Professional Engineering Services, RFQ No. 10-04-01
Financial Statement
Form of Business
Number of Years in Business
Credit Ratings
Workers Com ensation Rate
~.
Corporation
28 Years (Since 1981)
Corporate Checking Account:
SunTrust
Contact Person: Amine Radi
200 S. Orange A venue
Mail Code 2063
Orlando, FL 3280 I
Phone: 407/237-6832
Cash Management Account:
Merrill Lynch
Contact Person: Edward Wojcik
400 Winter Park A venue South, Suite 300
Winter Park, FL 32789
Phone: 407/646-6768
Dunn & Bradstreet Account No. 058232349
Tax ID# 59-2068806
Hilb Rogal & Hobbs of FL. Inc.
Contact Person: Steve Preston
300 Colonial Center Parkway, Suite 130
Lake Mary, FL 32746
Phone: 407/562-2502
Hilb Rogal & Hobbs of FL Inc. is the agency through which we purchase General
Liability, Automobile Liability, Workers Compensation, Professional Liability and
Umbrella Liability.
The Professional Liability Insurance carrier is:
U.S. Specialty Insurance Company
Contact: Steve Preston
Phone: 407/562-2502
Professional Liability Limit: $2,000,000
CPH maintains Professional Liability Coverage for all projects.
Bonding Company:
Florida Surety Bonds, Inc.
Contact: Jeffrey Reich, President
620 N. Wymore Road, Suite 200
Maitland, FL 32751
Phone: 888/786-2663
CPH bonds projects as necessary on a case by case basis.
.84
Professional Engineering Services, RFQ No. 10-04-01
Project Experience/Client
References
Project Experience
CPH has extensive experience and have provided services for numerous similar projects throughout
Florida. Our experienced team has successfully provided utilities, stormwater, roadways, streetscapes,
and urban open spaces that become a part of the community and become anchors for future
development. We have designed parks, urban town centers, and roadways, and have provided services
for enhancements to densely developed urban centers as well as new developments. The following
matrix highlights some of CPH recent projects and relevant experience. We have provided detailed
project descriptions on the Standard Form 330 located in Section 2.
~
~ ?
~ ~ .,!?t:::- ~ /!'
~ ? .~o, 'tJ & ~ .~o,
~ $ ~ fl- ~ ;? rft ~
~ .~
? ~ .,!? ~ ~ ~ ~ G ~
~ ~ ~ l!f .$ .~ ~ .f'
~ i::f ~
~ .~o, f? ~ ~ .~o,
~ ~ .~ II 'tJ 'tJ :S'
~ ~ SI ~ qJ. ~ .~ ~'t1 ~ ~ <Ji .~ ~
~ ,.g. f? ~ ~ ~ ~ ~ ~
~ ,g> .# ~ ~ ~ rf ~ ~
~ ~ Q,::S Q.~ "i ~ ~ cf (j (j ....., Q: $
City of Sanford X X X X X X X X X X X X X
City of Palm Coast X X X X X X X X X X X X X
City of Winter Springs X X X X X X X X X X X X X
City of Oviedo X X X X X X X X X X X X
City of Eustis X X X X X X X X X X X X X
City of Titusville X X X X X X X X X
City of Lake Alfred X X X X X X X X X X X X X
City of Lake Mary X X X X X X X X X X
Citv of Casselberry X X X X X X X X X X X X X
Volusia County X X X X X X X X X X
Oranqe County X X X X X X
Seminole County X X X X X X X X
Toho Water Authoritv X X X X X X X X
Valencia Water Control District X X X X X X X
Key Laroo Wastewater Treatment District X X X X X X
~d
Profcssiunal Engincering Services, RFQ No. 10-04-01
References
CPH has performed numerous similar services for other clients for over 25 years through continuing
services contracts. The listing of clients below is a sample of our continuing client base that can attest to
the professionalism and the quality of the work product produced by the CPH team.
City of Palm Coast
Mr. Richard Adams
2 Commerce Blvd.
Palm Coast, Florida 32164
Phone: (386) 986-2350
Fax: (386) 986-2391
radams@ci.palm-coast.fl.us
City of Winter Springs
Mr. Kipton Lockcuff, P.E.
1126 East S.R. 434
Winter Springs, Florida 32708
Phone: (407) 327-5989
Fax: (407) 327-6695
klockcuff@winterspringsfl.org
City of Sanford
Mr. Paul Moore, P.E.
P.O. Box 1788
Sanford, FL 32772-1788
Phone: (407) 330-5600
Fax: (407)330-5679
moorep@sanfordfl.gov
City of Lake Mary
Mr. John Litton
100 North Country Club Road
Lake Mary, Florida 32795
Phone: (407) 585-1419
Fax: (407) 324-3098
JLitton@lakemaryfl.com
City of Orlando
Mr. Alan Oyler, P.E.
P.O. Box 4990
Orlando, Florida 32802-4990
Phone: (407) 246-3623
Fax: (407) 246-2892
Alan. Oyler@cityoforlando.net
Orange County
Mr. Gary Morris, P.E.
9150 Curry Ford Rd.
Orlando, Florida 32825
Phone: (407) 254-9711
Fax: (407) 254-9799
GMorris@ocfl.net
City of Oviedo
Mr. Tony Segreto
400 Alexandria Blvd.
Oviedo, Florida 32765
Phone: (407) 971-5640
Fax: 407-977-6033
tsegreto@ci.oviedo.f1.us
City of Eustis
Mr. Erwin Gajentan
Post Office Drawer 68
Eustis, Florida 32726-0068
Phone: (352) 483-5430
Fax: (352) 357-2971
W ater@ci.eustis.fl.us
V olusia County
Ms. Mary Anne Connors
123 W. Indiana Ave.
DeLand, Florida 32720
Phone: (386) 736-5965
Fax: (386) 740-5162
mconnors@co.volusia.fl.us
City of Lake Alfred
Mr. John Deaton
500 North Romma Ave.
Lake Alfred, Florida 33850
Phone: (863) 291-5274
Fax: (863) 968-5088
utildir@mylakealfred.com
~.
Professional Engineering Services, RFQ No. 10-04-01
Proof of Authorization to
Transact Business in Florida
Surueyors & Mappers
Professioual Engineers
ArJ qi:::-ll.U~U
S1 ATE OF FLORIDA
~<>.~te o,fjplut'''~
Qi:, \ ~ _&H'f, c~,'j" .( 1 u ~.
~ <ilff!:fb ~ ~~~~\ '"
Board of PJbfessional~Engineers
!.,~,- OJ..L:!{.l _ ,to!
CP.H Engineers;' Inc.
~'o' ......."1 ,,"'''/
Is authorized under the provisions of seCti;p 41.1.023"FlOoda Statutes, to offer engineering serviceS
to the publiC through a Professional Enginei;f.'dUIY:I~nsed under Chapter 471, Florida Statutes.
O!PARTM!~O~ 8giI~~~~ ~ri~gUS2I~~~EnGULATIONSEQ# L09010'OOlU
~"~~LICllN" NBR I
01 09 :aOOg 000000000 LB71U
The SURVEYING " MAPPING BOSDfESS
Nam.d below IS CERTIFIBD
:;i~a~~~nPd~;~i~~: 2i. c~oner .7:01 P9.
CPR EN'IJlNEERS tHe.
500 W FULTON ST
SANFORD PL 32771
CBARLU CRIST
CHARLES W. DRAGO
Expiration: 28-Feb-11
Audit No: 22820110623
Certificate of Authorization
DISPI.AY AS REQUIRED BY LAW
CANo:
3215
Arcllitechtre
Landscape Architects
I AI;I l.il fl:S:::llJ STATE OF FLORIDA
I)IPAR~~RD ogFBH~fffUc~EP~OiM~i~~~LDUygJtTIONSEQf 1.08121000'760
~t'\I_.'U"':. t' "'3.~CEN91 NBR
1112/10/20oalo8027181:i1 1M26000926
The ARCHITECT FIRM
RUled below IS CERTIFIED
~~i~a~t~nP~~~~~i~~ ~i. c~~~er 481 FS.
AS A FICTITIOUS NAME
CPR
POST OFFIC! BOX 2808
SANFORD n 32772-2808
<0. 4556804
STATE OF FLORIDA
DEPARTMENT B8IRBU8p.~~p~R~k~~n~2NiR~EGULATIONsEa' 1.0510510102302
LICENSE NBR
09 01 4:009 090115733 LCOOOO:l98
The LANDSCAPE ARCHITECT BUSINESS
NU'led belo,", RAS REGISTERED
~~:~~.~~~nP~~~;~i~g~ ~~. c~~~~u 461 FS.
~8g ~~~i-N~~~6NI~~REET
PO BOX DRAWER 2808
SANPORD P'L 32772-2908
CHARLI8 crUST
GOVERNOR.
CHARLBS if. DRAGO
SECRETARY
CHARLIE CRIST
GOVERNOR
DISPlA.Y AS REOUIRED B. LAW
CHARLES W. DRAGO
SEeRKTARY
State of Florida
Department of State
I certdy from the records of this office that CPH ENGINEERS. INC is
a corporation organized under the laws of the State of Florida,. filed on
March 6. 198 L
The document number of this corporation is F22258
I further certify that said corporation has paid all fees duc this oflice
through December 31, 2010, that its most recent annual report was filed
on January 4, 2010, and its status is active.
I further certify that said corporation has not filed Articles of
Dissolution
(;ivrn II.nJn- my hanJ a"J 11r,. (;rt'fJ/."i,.llJ of
fI(lrida, ul Taflalrauu.lfu CupiJalllti.. tltl' Fiftlr
J'Y"f:~
Secretary of State
""u!hcnl;';M\ion lTJ lM'OI641.'i91160-"10~IU. I-:!lZ:"lI
T" Buth<.nhu!~ th.~ cffi,f""ic.'"'," Ihc h',ll.",,'''W .n~ ~nl.'f II,..
lD_lIf>.l thm ft~k", I"" ,,,,,IrUCI,m. J.........nJ
httr'i:II"fill.'.SQnhil.or~n.rbutf1\ t"r.html
~d
Professional Engineering Services, RFQ No. 10-04-01
Key Personnel Qualifications
and Experience
CPH has two offices nearby that are staffed with personnel that are ready and available to provide
services to the City of Sunny Isles Beach. This team will be led by Todd H. Hendrix, P.E. He will act as
Program Manager and will be the primary contact for the City.
Name
"(*I~"1'l'~=-
Role
David A. Gierach, P.E.,
CGC
Principal-in-Charge
29
Todd H. Hendrixl P.E.
Project Manager
13
Maria Zapata, P.E.
Project Engineer
18
Jason L. James
Project Designer
Judson C. Pankey, P.E.
Project Engineer
15
Lawrence J. Morey, Jr., P.E. Project Engineer 32
Kurt R. Luman, Jr., P.E. Project Engineer 9
Jackeline V. Toledo, P.E., Traffic Engineer 9
PTOE
Raghu K. Veturi, P.E, PTOE Traffic Engineer 8
Matthew Cushman, E. I. Project Engineer 5
Nicki M. McKenzie Project Designer 34
Charles A. Jensen, CET Project Designer 30
Gerald M. Cox, CUC, CGC Project Designer/ 33
Construction
~.
Education/Licenses
4
B.S. Environmental Engineering, University of Florida
Licensed Professional Engineer, Florida (No. 38642)
General Contractor License CG-C060789
MS Environmental Engineering, Florida International University
BS Biological Science, Florida International University
Licensed Professional Engineer States of Florida, Puerto Rico
M,S'I Civil Engineering, Univ. of Massachusetts
B.S. Civil Engineering Univ. of Massachusetts
Professional Engineer - (State of Florida and California)
B.S. Civil Engineer, University of Central Florida
EIT- Florida
B.S. - Environmental Engineering, University of Florida with High
Honors
Licensed Professional Engineer - FL & CA
Advanced Traffic Control Certification
M.S.E. - Civil Engineering and Environmental Sciences
B.S.E. - Civil Engineering and Environmental Sciences
Professional Engineer, State of Florida #17607
B.S. Civil Engineering, University of Central Florida, 2001
Professional Engineer - State of Florida
B.S. - Civil Engineering, University of South Florida
Registered Professional Engineer Florida (Reg. No. 64104)
B.S. - Civil Engineering, Nagarjuna University, India
M.S. - Transportation Engineering,University of Massachusetts
Professional Engineer State of Florida (No. 68918)
Professional Traffic Operations Engineer (PTOE TM )
B.S. in Aerospace Engineering, Minor in Mathematics
and Foreign Relations, Embry-Riddle Aeronautical College,
Intermediate Work Zone
Traffic Control MOT ApprovallD #40
Qualified Stormwater Management Inspector #4026
Associate of Science in Engineering Technology, National Institute for
Certification in Engineering Technologies
B.S.- Building Construction, University of Florida
Florida Certified General Contractor, #CGC01 0771
Florida Certified Utility Contractor, #CUC051667
Name
.'(*1i-....11~:4=-
Role
N. Katriina Bowman, P.E.,
CCS
Project Engineer
19
Rocco R. Nasso, P.E.
Project Engineer
James K. Winter, RLA, Landscape Architect 27
CLARB
Galen J. Pugh, RLA, AICP Landscape Architect 15
Victor Tan, AlA, NCARB Project Architect 30
John A. Baer, AlA, NCARB, Project Architect 30
LEED AP
Thomas J. Galloway, PSM
Project Surveyor
15
Amy E. Daly
Environmental Scientist
16
Aaron P. Moore
Environmental Scientist
10
9
Professional Engineering Services, RFQ No. 10-04-01
Education/Licenses
M.S. - Civil Engineering, Clemson University
B.S. - Civil Engineering, Clemson University
Licensed Professional Engineer - Florida (No. 45155)
Certified Construction Specifier - Construction Specifications Institute
Qualified Stormwater Management Inspector (FDEP)
Advanced Maintenance of Traffic Qualification (FDOT)
B.S. Civil Engineering, University of Central Florida
Licensed Professional Engineer - Florida (No. 64727)
Qualified Stormwater Management Inspector (FDEP)
Intermediate Maintenance of Traffic Certification
OSHA Construction Safety and Health Certification
Bachelor of Landscape Architecturel Mississippi State University
Registered Landscape Architectl States of Florida, Arkansas,
Tennessee, Texas, Connecticutl Georgia, and Rhode Island
CLARB Certified - #5203
Bachelor of Landscape Architecture, Louisiana State University
Landscape Architect, State of Florida #LA 1522
M.S. Architecture, London University
B.S., Architectural Major, University of Singapore
Registered Architect in Florida, Multiple States in US and P.R.
B.S. Architectural Studies, University of Milwaukee
Associate Degree Civil Structural Technology
Approved Professional for LEED Certification
Registered Architect (Florida, Connecticut, Minnesota, Wisconsin,
Michigan, Illinois, Indiana, Ohio, Iowa, Maryland and Pennsylvania)
B.S. Surveying and Mappingl University of Florida
Professional Surveyor & Mapper LS 6549
B.S.- Biological Sciences, Florida State University
M.B.A.- FMU, Summa Cum Laude
U.S. Army Corps of Engineers Wetland Delineation Course
Florida Unified Mitigation Methodology Course
FDEP Certified Stormwater Inspector, Prescribed Burne
B.S. Biology, University of Central Florida
Southwest Florida Water Management District, Soils Identification
Course
~.!]
ARCHITECT - ENGINEER QUALIFICATIONS
PART 1- CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Professional Engineering Services for the City of Sunny Isles Beach
2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
RFQ NO.1 0-04-01
B. ARCHITECT - ENGINEER POINT OF CONTACT
4. NAME AND TITLE
David A. Gierach, P.E.
5. NAME OF FIRM
CPH Engineers, Inc.
6. TELEPHONE NUMBER
305.274.4805
7. FAX NUMBER 8. E-MAIL ADDRESS
305.274.4807 NJindal@cphengineers.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
0: '0:
w w 20 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
~ >2 Of-
,f- Uu
0: -'0: CIl<(
0. <( ::lo:
0. (f)f-
CPH Engineers, Inc. 1992 SW 151 Street Civil, Architectural, Planning,
a. X Miami, Florida 33135 Landscape Architecture,
Construction, Environmental,
[ X ] CHECK IF BRANCH OFFICE Traffic Services
b.
[ ] CHECK IF BRANCH OFFICE
c.
[ ] CHECK IF BRANCH OFFICE
d.
[ ] CHECK IF BRANCH OFFICE
e.
[ ] CHECK IF BRANCH OFFICE
f.
CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
[ ] (
AUTHOR~EDFORLOCALREPRODUCT~N
MANDATORY USE DATE OF FORM 6/2004
STANDARD FORM 330 (1/2004) PAGE 1
12. NAME
David Gierach, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Principal-in-Charge
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
29 19
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Bachelor's of Science / Environmental Engineering / University of
Florida
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer-FL
Licensed General Contractor- FL
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizalions. Training. Awards. etc.)
General Contractors License
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Palm Coast CIP PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Palm Coast, FL 2000 2001
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal - Wastewater Treatment Plant expansion from 4.0 MGD to 6.83 MGD, master pumping station, pumping station upgrades, pumping station
generators, sewage force main construction, private effluent pumping system expansion, reclaimed water mains, R&R projects and blanket projects. CPH
will provide facility planning, design, permitting, construction administration and inspection services during the construction, as well as training services,
operation and maintenance services, SCADA orientation and development of an Operation and Maintenance Manual for the expanded treatment facilities.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Palm Coast Wastewater Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Palm Coast, FL 2001 2002
b. (3) BRIEF DESCRIPTION (Brief scope. size. cas!. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal - Wastewater Treatment Plant expansion from 4.0 MGD to 6.0 MGD, master pumping station, pumping station upgrades,
pumping station generators, sewage force main construction, private effluent pumping system expansion, reclaimed water mains,
R&R projects and blanket projects.
(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
Sanford Master Water/Wastewater PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 1998 1999
c. (3) BRIEF DESCRIPTION (Brief scope. size. cas!. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
CPH has provided facilities planning, design, and permitting of water, wastewater and reclaimed water facilities within the City
of Sanford. The comprehensive program for the City includes the construction of wastewater collection and transmission
facilities, reclaimed water lines, potable water mains and a new water reclamation facility in the Southeast region of the service
area.
(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
Sanford South Water Resource Center PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2004 2006
d. (3) BRIEF DESCRIPTION (Brief scope. size. cas!. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
CPH has provided facilities planning, design, and permitting of water, wastewater and reclaimed water facilities within the City of Sanford.
The comprehensive wastewater management program for the City includes the construction wastewater collection and transmission
facilities, reclaimed water lines, potable water mains and a new water reclamation facility in the Southeast region of the service area.
(1) TITLE AND LOCATION (CityandSlale) (2) YEAR COMPLETED
Casselberry Misc. Services PROFESSIONAL SERVICES
Casselberry, FL 2006
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Principal - The City of Casselberry Water Reclamation Facility was expanded, as part of a $2 million capital improvements
program, to allow the production of a highly treated effluent, reclaimed water, for spray irrigation purposes on a public access at
sites and to meet Class I Reliability requirements.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Todd H. Hendrix, P.E
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Project Manager
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
12 12
15. FIRM NAME AND LOCATION (City and Stale)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
Master's of Science/ Civil Engineering/ Florida International
University 1998
Bachelor's of Science/ Civil Engineering/ Florida International
University 1996
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
ME/ Professional Engineer
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards, etc.)
None
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Lowe's of Homestead PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Homestead, FL 2006
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Design, permitting, and construction of a.:t 170,000 sf. Lowe's store and associated infrastructure.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sun Trust PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Homestead, FI 2006 2006
b. (3) BRIEF DESCRIPTION (Brief scope. size. cosl. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Design, permitting, and construction of a.:t 4,980 sf. Sun Trust Bank and associated infrastructure.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Tomoka Golf Village PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Ormond Beach, Volusia County, FL 2006
c. (3) BRIEF DESCRIPTION (Brief scope. size, coSI. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Design and permitting, of a planned residential development" Tomoka Golf Village" including residential
homes, condominiums, club house, tennis center, and associated infrastructure.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
Above Ground Storage and High Service Pumping Facility, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 1999 2000
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer - Design, permitting, and construction of IMG above ground storage and high service pumping facility.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Derbyshire Baseball Complex PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Daytona Beach, FL 1998 1999
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer - Design, permitting, and construction of a Baseball complex including site grading, drainage, and utilities.
STANDARD FORM 330 (112004) PAGE 2
12. NAME
Maria Zapata, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
15 4
15. FIRM NAME AND LOCATION (City and Slale)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Master's of Science/ University of Massachusetts
Bachelor's of Science/ Civil Engineering/ University of
Massachusetts
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
CN Professional Engineer
18. OTHER PROFESSIONAL QUALIFICATIONS (Publica lions. Organizations. Training, Awards. etc.)
None
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (CityandSlale) (2) YEAR COMPLETED
Lowe's of Homestead PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Homestead, FL 2006
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Design, permitting, and construction supervision of a.:!: 170,000 sf. Lowe's Store and associated
infrastructu re.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
SunTrust PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Homestead, FL 2006 2006
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager- Design, permitting, and construction supervision of a.:!: 4,980 sf. SunTrust Bank and associated
infrastructure.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Tomoka Golf Village PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Ormond Beach, FL 2006
Volusia County
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer- Design and permitting of a planned residential development "Tomoka Golf Village" including residential
homes, condominiums, club house, tennis center, and associated infrastructure.
(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
Feasibility Study- Wal-Mart distribution Center PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Morovis, Puerto Rico 2006 2006
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager- Feasibility Study of a ::L 95 acres site for a Wal-Mart distribution Center including building, parking areas,
utilities and stormwater infrastructure and access roads.
(1) TITLE AND LOCATION (CityandSlale) (2) YEAR COMPLETED
Lowe's of Kendall PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami, FL 2007
e. (3) BRIEF DESCRIPTION (Brief scope. size. cas!, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager- Design, permitting, and construction supervision a Lowe's Store with associated infrastructure.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Jason James
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Project Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
4 4
15. FIRM NAME AND LOCATION (Ci/y and Sla/e)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor's of Science/ Civil Engineering/ University of Central
Florida 2005
17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
None
18. OTHER PROFESSIONAL QUALIFICATIONS (Publicalions, Organizalions. Training, Awards. etc)
None
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Sta/e) (2) YEAR COMPLETED
Panda Express - Sunset PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Miami-Dade County, FL 2006 2006
a. (3) BRIEF DESCRIPTION (Brief scope, size, cas!, elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer - Design, permitting, and construction supervision of 2,518 sf. store with associated infrastructure.
(1) TITLE AND LOCATION (Ci/y and S/a/e) (2) YEAR COMPLETED
Panda Express - Homestead PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Homestead, FL 2006 2006
b. (3) BRIEF DESCRIPTION (Brief scope, size, cOSI, elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer- Design, permitting, and construction supervision of 2,518 sf. Store with associated infrastructure.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Auto Zone PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Carolina, Puerto Rico 2006 2006
C. (3) BRIEF DESCRIPTION (Brief scope, size, cas!, elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer- Design, permitting, and construction supervision of approximately 7,380 sf. Auto Zone Store with associated
infrastructure.
(1) TITLE AND LOCATION (Ci/y and S/ale) (2) YEAR COMPLETED
Auto Zone PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Cayey, Puerto Rico 2006 2006
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer- Design, permitting, and construction supervision of 7,380 sf. Store with associated infrastructure.
(1) TITLE AND LOCATION (Ci/yandS/a/e) (2) YEAR COMPLETED
Feasibility Study- Wal-Mart distribution Center PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Morovis, Puerto Rico 2006 2006
e. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer-Feasibility Study of a.:t.. 95 acres site for a Wal-Mart distribution Center including building, parking areas,
utilities and stormwater infrastructure.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Judson C. Pankey, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
14
15. FIRM NAME AND LOCATION (Cily and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
B.S. - Environmental Engineering
University of Florida with High Honors
Licensed Professional Engineer - FL & CA
Advanced Traffic Control Certification
18. OTHER PROFESSIONAL QUALIFICATIONS (Publica lions. Organizations. Training. Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
North Cattlemen and Desoto Roads PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sarasota County, FL
a. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
One mile of 4 lane divided arterial (Cattlemen) including signalization, flood plain impacts, and three round-abouts
Half mile of 2 lane undivided collector including a box culvert bridge with wildlife crossing and wetland impacts.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
NC-3 Master Lift Station Upgrades PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable)
Sarasota County, FL
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Pump upgrades, odor control, and auxiliary power upgrades to an existing master lift station.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Hickory Boulevard Water Main Analyses PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Bonita Springs, FL
c. (3) BRIEF DESCRIPTION (Brief scope, size. cas!. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Analysis of an existing unlooped main serving a barrier island with recommendations for improvements to boost residual
pressures.
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
North port Heath Clinic PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
North port, FL
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Expansion of existing clinic with addition of tobacco educational building and site improvement LEED Certification (Silver)
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
Plantation Boulevard Expansion PROFESSIONAL SERVICES
North Port, FL
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
One mile of 2 and 4 lane divided collector including utilities, box culvert bridges and regional watershed analysis.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Lawrence J. Morey Jr., P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Project Engineer/Roadway
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
30 6
15. FIRM NAME AND LOCATION (CilyandState)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Master's of Science/ Engineering/ Civil Engineering and
Environmental Sciences
Bachelor's of Science/ Engineering/ Civil Engineering and
Environmental Sciences
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FU Professional Engineer
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards. elC)
American Society of Highway Engineers
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
Lithia Pincrest Road PD&E Study and Four-Laning PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2008
a. (3) BRIEF DESCRIPTION (Brief scope. size. cas!. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
The project consists of the preliminary study and design for a 4-lane widening of approximately 1.6 miles of existing 2-lane
roadway. The study included Right-of-Way needs assessment, title searched, appraisals, typical section analysis, various
alignment analysis, and preliminary cost estimating. The final design includes the final plans for permitting and construction for a 4-
lane urban divided section.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Belle Terre Parkway Four Lane Design - PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Palm Coast, FL 2007 2008
b. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Task consisted of widening 4.2 miles of an existing 2-lane rural road to a 4-lane urban divided road, designing the stormwater
management system, five new signalized intersections, and permitting through St. Johns River Water Management District.
The project included utility coordination with Florida Power & Light, and the City of Palm Coast. Utility Department
(1) TITLE AND LOCATION (CityandSfate) (2) YEAR COMPLETED
Rhode Island Avenue and Westside Parkway PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Vol usia County, FL 2007 2008
c. (3) BRIEF DESCRIPTION (Brief scope, size, cas!. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Task consisted of designing a new 2-lane divided rural road with raised curbed median, and re-design of an existing signalized intersection, Design included
a 2-lane typical section that can be widened in the future to a 4-lane urban road with minimal construction. The stormwater management system was
designed to collect and treat the runoff from the current 2-lane rural road, but also has the capacity and the infrastructure in place to handle the future
widening utilizing the same stormwater pipe/treatment system. Permitting included stormwater permitting through 5t. Johns River Water Management
District and FOOT District 5 Drivewav Connection Permit.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Michigan Ave. Widening PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Kissimmee, FL 2002 2003
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - CPH provided roadway design services for the widening of Michigan Avenue from the existing 3 - lane (two
through lanes and one continuous left turn lane), rural section to a 5 - lane, urban typical section.
(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
Indiana Avenue Streetscape Project PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
DeLand, FL 2004 2004
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - East Indiana Avenue is a two-way, two-lane facility east of Woodland Boulevard to Alabama Avenue, which
was streetscaped to conform with the streetscape design of West Indiana Avenue and Woodland Boulevard in downtown
DeLand. All of the existing asphalt pavement on East Indiana Avenue was removed from the top of the original 6" thick
concrete roadway, and replaced with Briick pavens.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Kurt R. Luman Jr., P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13. ROlE IN THIS CONTRACT
Project Engineer/Roadway
14. YEARS EXPERIENCE
a. TOTAL I b. WITH CURRENT FIRM
10 8
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor's of Science/Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FU Professional Engineer
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc)
American Society of Civil Engineers
American Public Works Association
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Belle Terre Parkway Four Lane Design - PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
City of Palm Coast, FL 2007 2008
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost. elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Task consisted of widening 4.2 miles of an existing 2-lane rural road to a 4-lane urban divided road, designing the stormwater
management system, five new signalized intersections, and permitting through St. Johns River Water Management District.
The project included utility coordination with Florida Power & Light, and the City of Palm Coast. Utility Department.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Tenth Street PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Vol usia County 2007 2008
b. (3) BRIEF DESCRIPTION (Briel scope. size. cost, elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
This task consisted of reconstructing 1.2 miles of an existing 2-lane rural road to a 4-lane divided urban road. The proposed cross-
section included four 12-ft lanes with 4-ft bike lanes in both directions.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Rhode Island Avenue and Westside Parkway PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Volusia County, FL 2007 2008
c. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Task consisted of designing a new 2-lane divided rural road with raised curbed median, and re-design of an existing signalized intersection. Design included
a 2-lane typical section that can be widened in the future to a 4-lane urban road with minimal construction. The stormwater management system was
designed to collect and treat the runoff from the current 2-lane rural road, but also has the capacity and the infrastructure in place to handle the future
widening utilizing the same stormwater pipe/treatment system, Permitting included stormwater permitting through 5t. Johns River Water Management
District and FOOT District 5 Drivewav Connection Permit.
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
Michigan Ave. Widening PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Kissimmee, FL 2002 2003
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project Manager - CPH provided roadway design services for the widening of Michigan Avenue from the existing 3 - lane (two
through lanes and one continuous left turn lane), rural section to a 5 -lane, urban typical section,
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
Indiana Avenue Streetscape Project PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
DeLand, FL 2004 2004
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Project Manager - East Indiana Avenue is a two-way, two-lane facility east of Woodland Boulevard to Alabama Avenue, which
was streetscaped to conform with the streetscape design of West Indiana Avenue and Woodland Boulevard in downtown
DeLand. All of the existing asphalt pavement on East Indiana Avenue was removed from the top of the original 6" thick
concrete roadway, and replaced with brick pavens.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Jackeline Toledo, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Traffic Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
9 2
15. FIRM NAME AND LOCATION (City and Slale)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
University of South Florida
Bachelor Science - Civil Engineering
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer #64104 Florida
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc.)
Tampa Bay Institute of Transportation Engineers - Past President 2002-2004, American Society of Civil Engineers
Institute of Transportation Engineers - Past Florida Planning Council Secretary, Society of Hispanic Professional Engineers, and
Society of Women Engineers
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sarasota/Manatee Long Range Transportation Plan, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sarasota Manatee MPO, Florida 2006
a. (3) BRIEF DESCRIPTION (Brief scope. size. cas!, elc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Project Transportation Planner for the Sarasota Manatee MPO to assist in the preparation of the Sarasota/Manatee MPO 2030 Long Range Transportation Plan (LRTP), which
guides the development of a balanced multimodal transportation system in Sarasota and Manatee Counties, ICON was specifically responsible for managing the travel demand
forecasting component of this task. This included assisting in validation and conversion of the SMATS model for development of the Long Range Transportation Plan, development of the
2030 model, and modeling alternatives in support of determining needs and prioritizing future improvements.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
USF Tampa Campus Master Plan (10-Year Update) Transportation PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Element, Tampa, Florida 2006
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Project Engineer providing a more involved development / greater investigation of the transportation issues developed in the Master Plan 2000, previously developed by ICON.
Services included updating the campus master plan for the 10 year and long range timeframes per statutory requirernents for anticipated enrollment, research, and associated
facilities growth, The master plan process includes impact to campus utilities, infrastructure, transportation, parking, and housing, as well as off-campus impacts to services
provided by other entities, 2004-2005
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
Lithia Pinecrest Rd / Lumsden Ave PD&E, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Brandon, Florida 2005
c. (3) BRIEF DESCRIPTION (Brief scope. size. cas!, elc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Lead Transportation Engineer; responsible for all transportation engineering activities associated with the Study for widening and improvements surrounding this 1.2 mile radius study
area. Managed the transportation task to develop feasible alternatives to increase safety and mobility in and around the intersection, A total of seven intersections were evaluated,
Conducted all traffic engineering work and technical writing for existing and future conditions. Engineering work included summary of field inventory, manual and automatic
traffic/pedestrian count summary, capacity analysis, crash analysis, development of future traffic volumes and alternatives analysis.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Upper Manatee River Road PD&E, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Manatee County, Florida 2002
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost, elc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
Transportation Engineer. The purpose of this PD&E was for improving north-south traffic circulation in eastern Manatee County and to evaluate increased vehicular capacity
crossing the Manatee River. The first step was to identify the study area as defined by Manatee County and FOOT: 1-75 to the west, US 301fCR 675 to the north, Rye Road to the
east, and SR 64 to the south. Specific responsibilities included conducting a sub-area model validation, and forecasting future travel demand for Upper Manatee River Road Study
Area, Recomennded preferred alternative; developed design peak hour volumes; conducted traffic analysis using HCS and Synchro; developed recommended intersection geometries.
and queue lengths; assisted in the proper documentation.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1-75 PD&E, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Lee and Collier Counties, Florida 2002
e. (3) BRIEF DESCRIPTION (Brief scope, size, cas!, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
Transportation Engineer for a Development & Environment (PD&E) study from south of Bonita Beach Road to SR 78 in Lee County. The study included a detailed environmental
and engineering analysis. The information generated during the study was analyzed, evaluated and documented in a series of reports predicting impacts, suggesting opportunities
for improvements and estimating costs associated with the improvement of the facility. Improvements included upgrades to interchanges and mainline roadway as needed to
accommodate traffic projected through the year 2030, Specific responsibilities included merging origin-destination results and the FSUMTS model to better replicate travel patterns.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Raghu Veturi, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Sr. Traffic Analyst
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
7 3
15. FIRM NAME AND LOCATION (CityandSlale)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S. - Civil Engineering, 2001, Nagarjuna University, India
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer
M.S. - Transportation Engineering, 2003, University of
Massachusetts, Lowell
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. etc)
Institute of Transportation Engineers (ITE), American Society of Civil Engineers (ASCE)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Belle Terre Parkway Roadway Widening Traffic Analysis, City of Palm PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Coast, Florida 2007
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Sr. Traffic Analyst - Conducted analysis in support of the design of the widening of Belle Terre Parkway. Length of project was approximately four miles.
Services included Traffic Analysis, Access Management, Traffic Signal Warrant Analyses Traffic Signal Timing Design. Fees for services totaled $35,000.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Brushwood Lane Intersection Analysis and Improvements, PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable)
City of Palm Coast, Florida 2006 2006
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Sr. Traffic Analyst - Qualitative analysis of design options, signal warrant analysis, and conceptual design of intersection improvements to avoid the need
for a traffic signal (to maintain level of service) but also improve safety and traffic operations, minimize cut-through traffic, and minimize impacts to
stakeholders. Recommended concept was designed and construction was managed by CPH Engineers. Scope of project included two intersections
approximately 700 feet apart and associated turn lanes and traffic control devices. The fees for the analysis and conceptual design totaled $8,500.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Progressive Auto Insurance - Trip Generation Study PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2006
C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Sr. Traffic Analyst - Hillsborough County required that an alternate trip generation rate for proposed Auto Insurance Concierge center be determined, as the
Institute of Transportation Engineers (ITE) does not have data for land uses similar to the proposed site. Accordingly, CPH conducted a trip generation
study by selecting three existing Progressive Auto Insurance Concierge Centers. CPH has coordinated 72-hour machine counted traffic volume counts at
these three (3) sites, trip generation rate analysis and calculations, and prepared a report per ITE methodologies and procedures.
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
Bank of America Traffic Impact Study Review PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2007
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Sr. Traffic Analyst - CPH Engineers assisted the applicant with the review of a Traffic Impact Study prepared by a City of Sarasota Consultant. Several
land use scenarios were evaluated and modified to address concurrency issues, CPH was required to work with City of Sarasota staff and their Consultant
closely to arrive at a mutually agreed upon detailed analysis and mitigation improvements which addressed the impacts of the project yet still allowed the
City to adhere to the Comprehensive Plan and Zoning Code.
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Nicki M. McKenzie
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Designerffransportation
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
35 2
15. FIRM NAME AND LOCATION (CityandStale)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Roadway Design and Quality Control
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Intermediate Work Zone
Traffic Control MOT ApprovallD #40
Qualified Stormwater Management Inspector #4026
18. OTHER PROFESSIONAL QUALIFICATIONS (Publica lions, Organizations. Training. Awards. etc)
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (CityandSlale) PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable)
Bell Shoals Road Four Lane Design - Newland Communities and
Hillsborough County NC5016 CIP 69112 2006 pending
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm
New construction of 3.2 miles of an existing 2-lane road to a 4-lane urban divided road with bridge widening and the design of the
stormwater management system, five signalized intersections, and permitting through Southwest Florida Water Management
District. The project includes utility coordination.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Lithia Pincrest Road PD&E Study and Four-Laning PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable)
2008
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
The project consists of the preliminary study and design for a 4-lane widening of approximately 1.6 miles of existing 2-lane
roadway. The study included Right-of-Way needs assessment, title searched, appraisals, typical section analysis, various
alignment analysis, and preliminary cost estimating. The final design includes the final plans for permitting and construction for a 4-
lane urban divided section.
(2) YEAR COMPLETED
(1) TITLE AND LOCATION (CityandState) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
C. (3) BRIEF DESCRIPTION (Brief scope. size. cost, elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
(1) TITLE AND LOCATION (CityandState) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable)
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost. elc) AND SPECIFIC ROLE [X] Check if project perfonned with current firm
(1) TITLE AND LOCATION (CityandState) (2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable)
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [X.] Check if project performed with current firm
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
CharlesJensen,CET
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Project Designer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
32 28
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
AS in Engineering Technology
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
None
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards, etc)
Certified Engineering Technician through NICET, (National Institute of Certified Engineering Technicians)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Palm Coast Water Treatment Plant No.3 PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
City of Palm Coast, FL 2006 2008
a. (3) BRIEF DESCRIPTION (Briel scope. size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design and Construction of a 9 MGD (3 MGD first phase), Low Pressure Reverse Osmosis Water Treatment Plant. This project
included the construction of an operations building, LPRO building, clear well, chemical building, generator building, 2 MG ground
storage tank, and associated pumps and piping. Construction cost, $17,000,000.00
(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
Volusia County Utilities Southeast Regional Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Oakhill, FL 2000 2003
b. (3) BRIEF DESCRIPTION (Briel scope. size, cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design and Construction of a 0.5 MGD expandable to 1.2 MDG oxidation ditch wastewater treatment facility. This project
consisted in the design and construction of an oxidation ditch (Orbal process), Clarifiers, tertiary filters, chlorine contact chamber,
transfer pumps, 2 MG ground storage tank, irrigation pump station, grove irrigation system and operations building. The
construction price for this project was $4,500,000.00
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Vol usia County Utilities Southwest Regional Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Expansion, DeBary, FL 1998 2001
c. (3) BRIEF DESCRIPTION (Briel scope. size. cost etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design and Construction of the expansion of the Southwest Regional WRF from 0.5 MGD to 1.2 MGD, to include the construction
of a 1.5 MG ground storage tank, adding an outer ring to the oxidation ditch, constructing reclaimed water distribution pump station,
and associated pumps piping and controls. Construction Cost $3,000,000.00
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Volusia County Utilities Deltona North Water Reclamation Facility PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
Improvements, Deltona, FL 1996 1999
d. (3) BRIEF DESCRIPTION (Briel scope. size. cost etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design and Construction services for improvements to Volusia County's Water Reclamation Facility to provide tertiary filters, 1 MG
ground storage tank, high level disinfection, reclaimed water distribution pump station, and associated pumps piping and controls.
Construction Cost $2,500,000.00
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Digester Improvements for Deltona North Wastewater Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION (II Applicable)
For Volusia County Utilities, Deltona, FL 1994 1996
e. (3) BRIEF DESCRIPTION (Briel scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design and Construction of an aerobic digester for the Deltona North Wastewater Treatment Plant, consisted of providing sludge
handling facilities consisting of a 250,000 gallon digester with blowers, aeration system and associated pumps, piping and
electrical work. Construction cost $200,000.00
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Gerald Cox, CGC, CUC
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13. ROLE IN THIS CONTRACT
Project Designer/ Construction
14. YEARS EXPERIENCE
a. TOTAL I b. WITH CURRENT FIRM
33 7
15. FIRM NAME AND LOCATION (Ci/yandS/a/e)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor's of Science / Building Construction / University of Florida
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL/ General Contractor
FL/ Utility Contractor
18. OTHER PROFESSIONAL QUALIFICATIONS (Publica/ions. Organizations, Training. Awards. elc)
DEP - Stormwater Management Inspector
Trained in Metal Building Assembly - Inland Steel
1~RELEVANTPROJECTS
(1) TITLE AND LOCATION (Ci/yandSlale) (2) YEAR COMPLETED
St Farmers Mkt ArcadialWauchula PROFESSIONAL SERVICES CONSTRUCTION (1/ Applicable)
Wauchula, FL 2005 2006
a. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Task included a post storm survey of the Farmer's Marketing and to generate a set of pre-storm documents
from archived data in order to formulate a set of design/restoration construction documents for bid purposes. CEI services were
also provided. Design Fee: $640,000 - $4.6 GMP Construction
(1) TITLE AND LOCATION (Ci/yandSlale) (2) YEAR COMPLETED
Beachfront & Jetty/Engineering Services PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2005
b. (3) BRIEF DESCRIPTION (Brief scope. size. Cast etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - CPH developed a set of concept drawings and budgets for future improvement to the Marina Island
Complex. Fee - $40,000
(1) TITLE AND LOCATION (Ci/yandS/ale) (2) YEAR COMPLETED
Gateway At Riverwalk - SunCor PROFESSIONAL SERVICES CONSTRUCTION (/1 Applicable)
Sanford, FL 2006
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - CPH developed construction documents for three (3) additional towers and associated townhomes and a
parking facility. CPH also revised and resubmitted site plans that included ammended regulatory permitting. Fee - $600,000
(1) TITLE AND LOCATION (Ci/yandSla/e) (2) YEAR COMPLETED
Reverse Osmosis Water Treatment Plant PROFESSIONAL SERVICES CONSTRUCTION (/1 Applicable)
Manalapan, FL 2004 2006
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Design services for a 1.7 MGD Reverse Osmosis Water treatment Facility for the Town of Manalapan. This
project was a design/build contract performed with Wharton-Smith Construction. Design Fee: $280,000 - $3.8 Million Project.
(1) TITLE AND LOCATION (Ci/yandS/ale) (2) YEAR COMPLETED
Sanford Marina Townhomes - SunCor PROFESSIONAL SERVICES CONSTRUCTION (/1 Applicable)
Sanford, FL 2006
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost, e/c) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Currently developing design concepts for development options for client controlled property's on the Sanford
Marina Island.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Katriina Bowman, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Project Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
19 17
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
Master's of Science/ Civil Engineering/ Clemson University/ 1988
Bachelor's of Science/ Civil Engineering/ Clemson University/ 1986
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL/ Professional Engineer
18. OTHER PROFESSIONAL QUALIFICATIONS (Publica lions. Organizations. Training. Awards, etc)
Certified Construction Specifier - Construction Specifications Institute (CSI)/ Qualified Stormwater Management Inspector (FDEP)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Mill Creek & Cloud Branch Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2000 2000
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer
The Mill Creek and Cloud Branch drainage basins are approximately t 980 acres located within the northwestem portion of the City. CPH's services included reviewing earlier
reports, conducting field visits, gathering updated information, interviewing City and County staff, reviewing jurisdictional considerations, and establishing an existing condition
and proposed improvements stormwater modeling and overall report that was used to obtain an Individual MSSW Permit from the SJRWMD.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
2nd Street Stormwater Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 1999 1999
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer
The new stormwater system along Second Street consists of approximately 2400 lineal feet of storm sewer, ranging in size from 60" RCP to 6' x 7' concrete box
culvert. Along a significant portion of the box culvert route along Second Street, the surface of the street was brick. An alignment of the new stormwater
system was chosen to accommodate removal and replacement of the 27" sanitary sewer system.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
St. John's Parkway Phase 1 & 3 PROFESS~NALSERV~ES CONSTRUCTION (If Applicable)
Sanford, FL 2004 2004
C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer
This project consisted of widening existing roadway and constructing new four lane divided roadway east and west of the Smith Canal. CPH's services
included design, permitting through the SJRWMD, and CEI services. Design included extensive stormwater modeling to serve construction of four new
stormwater ponds, diverting offsite flows around the ponds, and sizing of an arch culvert at the canal crossing.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Marina Island Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2005 2005
d. (3) BRIEF DESCRIPTION (Brief scope. size. cosl. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer
The Project consists of the construction of over 1300 linear feet of new seawall and shoreline stabalization (aluminum sheet pile with concrete revetment
cap) along the north shore of Marina Island at Lake Monroe in downtown Sanford. CPH's services included design, permitting through FDEP.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
City of Sanford U.S. 17-92 Utility Relocation PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2000
e. (3) BRIEF DESCRIPTION (Brief scope. size. cosl, elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Engineer - This project consisted of relocating the City's 20" reclaimed water main (seasonal discharge line) along the construction area serving
new ramps and stormwater structures on U.S. 17-92 at 1-4. CPH's services included design, permitting, attending utility coordination meetings, assisting
the City with the preparation and submittal of the FOOT Utility Work Agreement and Utility Work Schedule, preparing and submitting invoicing for
reimbursement from FOOT on behalf of the City, plus bidding and construction phase services.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Rocco N. Nasso, P.E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com tete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Engineer
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
9 8
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
B.S. Civil Engineering, University of Central Florida
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Licensed Professional Engineer - Florida (No. 64727)
Qualified Stormwater Management Inspector (FDEP)
Intermediate Maintenance of Traffic Certification
OSHA Construction Safety and Health Certification
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards. elc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Sanford Gasification Plant - OU3 Feasibility Study Hydraulic Modeling PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2007 N/A
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Conduct existing conditions modeling to establish pre-construction flows and levels, conduct preliminary hydraulic analysis /
stormwater modeling for open channel and culvert options associated with the OU3 to assess the current proposed remedy in
terms of the hydrologic design of the proposed stormwater conveyance system along 1600' of the Cloud Branch drainage channel.
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
Cloud Branch Phase 2 Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2007 pending
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Stormwater modeling using ICPR, permitting through the SJRWMD and CSX, construction of a 4.3 acre stormwater pond, 550-ft
channel improvements, street crossing culvert upgrades.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Cloud Branch Phase 1 Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2007 2007
c. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Stormwater modeling using ICPR, permitting through the SJRWMD, construction of a 2.8 acre stormwater pond, regrading of
approximately 2800 linear feet of existing channel, upgrading road crossing culverts with new box culvert sized 3' x 7' to 4' x 6'.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Orlando-Sanford International Airport Lift Stations and Force Mains PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable)
2006 2006
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Design, permitting, bidding, and CEI services for the construction of two new lift stations, removal of one existing lift station,
removal of an abandoned WWTP, construction of 1300' of 20" FM, 11600' of 10"-12" FM, 1900' of 8"-12" sanitary sewer, and 3700'
of 12" WM.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
St. Johns Parkway Ph. 1 and Ph. 3 Construction PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Sanford, FL 2004 2004
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Stormwater modeling using ICPR, permitting through the SJRWMD, widening existing roadway and constructing new four lane
divided roadway, storm sewer ranging in size from 15"-60" to 48"x76", adjacent offsite parcel regrading and coordinating with two
separate developers for the construction of joint use ponds on the privately owned parcels, enclosure of existing roadside swales
via the installation of new culverts along the roadway.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
James Winter, RLA, CLARB
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Comolete one Section E for each key person.)
13. ROLE IN THIS CONTRACT
Landscape Architect
14. YEARS EXPERIENCE
a. TOTAL I b. WITH CURRENT FIRM
28 1
15. FIRM NAME AND LOCATION (City and Slate)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Bachelor's of Landscape Architecture/ Mississippi State University
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL, AK, TN, TX, GN Registered Landscape Architect
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizalions, Training. Awards. etc)
CLARB Certified
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Heathrow Country Estates PROFESSIONAL SERVICES CONSTRUCTION (tf Appticable)
2005 2006
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - CPH provided landscape architectural, planning, and final design services for Estate Homes in
this exclusive Seminole County Golf Community.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Lighthouse Point Park Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicabte)
Volusia County, FL 2005 2006
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - CPH provided landscape architectural services for this sea side park in Vol usia County. The work consisted
of expanding the size of the restroom/picnic shelter, expanding the water service to include two fire hydrants and a 2" service
line, extending the sanitary sewer line including a lift station design, to replace the septic tank and drainfield system, and the
addition of picnic shelters along the shoreline.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Lake Monroe Trail PROFESSIONAL SERVICES CONSTRUCTION (tf Applicabte)
Volusia County, FL 2005 2006
C. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - CPH provide landscape architectural services for this 12' wide bike trail. The 13000 plus trail connects Lake
Monroe Park and Gemini Springs Park. The trail includes approximately 340 feet of boardwalk over wetland areas.
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Magnolia Square PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Winter Springs, FL 2006 2006
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - This downtown plaza included a wide range of hardscape elements with specialty paving, various site
furnishings, landscape and a feature fountain in the heart of Winter Springs new Town Center. This is part of an overall
revitalization project for the city.
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
Trail Design - Magnolia Square to Central Winds PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Winter Springs, FL 2005 2006
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - This project is a promenade through lush garden spaces including butterfly gardens, palm allees, perennial
gardens, pergolas, classic style pavilions, and fountains. The segment of the trail terminates at the proposed Veteran's
Memorial and Magnolia Square. Future segments will lead to an interactive fountain currently under design by CPH, an
Amphitheatre and the Cross Seminole Trail
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Galen J. Pugh, ASLA
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Landscape Architect
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
15
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Landscape Architecture, Louisiana State University
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Landscape Architect, State of Florida
#LA 1522
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. elc)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
Sanford 151 Streetscape /Gateway Improvements PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2007 2008
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Staff Landscape Architect- CPH is currently contracted with the City of Sanford to provide a streetscape design package for a 6
block section of Historic First Street. The intent of this project is to closely match the streetscape of improvements previously
completed on First Street.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Trail Design - Magnolia Square to Central Winds PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Winter Springs, FL 2005 2006
b. (3) BRIEF DESCRIPTION (Brief scope. size. cOSI, elc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Staff landscape Architect - This project is a promenade through lush garden spaces including butterfly gardens, palm allees,
perennial gardens, pergolas, classic style pavilions, and fountains. The segment of the trail terminates at the proposed
Veteran's Memorial and Magnolia Square. Future segments will lead to an interactive fountain currently under design by CPH,
an Amphitheatre and the Cross Seminole Trail
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Alabama Avenue PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Deland, Florda 2007 -2008 N/A
C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [X] Check if project performed with current firm
Staff landscape Architect- Trail design and landscape beautification for recreational multipurpose trail along Alabama Avenue
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Base Place Park, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Orange County, Florda 1996-1997 1999-2000
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost, elc) AND SPECIFIC ROLE [ ] Check if project performed with current firm
4-acre Active Neighborhood Park including recreational trail, soccer field and playground
Project coordinator, facilitated public meetings
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Fort Christmas Historical Park, PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Orange County, Florida 1996-1998 ongoing
e. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [ ] Check if project performed with current firm
24-acre Regional Specialty Park masterplan for the relocation and renovation of historical homes village
Project Coordinator, facilitated public meetings
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Victor Tan, AlA, NCARB
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Architect
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
20 4
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
Master's of Science/ Architecture/ London University/ 1976
Bachelor's of Science/ Architecture/ University of Singapore/ 1973
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FU Registered Architect
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards. etc.)
American Institute of Architects (AIA)/ National Council of Architectural Registration Board (NCARB)/ Alberta Association of
Architects
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Lake Louise Plaza PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Eustis, FL 2005 2005
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Architect - Architectural and engineering design of a 17,650 SF retail shopping center. Cost - $1.8 Million
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Strawberry Fields T ownhomes PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Ft. Pierce, FL 2004 2007
b. (3) BRIEF DESCRIPTION (Brief scope. size. cosl, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Architect - Design of a 92 Unit Two-Story town home complex with a typical unit consisting of approx. 1300 SF and a
one car garage. Cost - $12.8 Million
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Waterside Condo's (Design/Build) PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2003 2006
c. (3) BRIEF DESCRIPTION (Brief scope. size. cos!, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Architect - Architectural and engineering design of seven (7) buildings. Two (2) building consist of four-stories, and five
(5) buildings consist of three-stories.
(1) TITLE AND LOCATION (Cily and State) (2) YEAR COMPLETED
Children's Lighthouse PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Winter Garden, FL 2004 2005
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - Design of a single story masonry building of 13,077 SF and a multi-purpose room of 3,157 SF.
Cost - $1.4 Million
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
Deltona Fire Station #62 PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Deltona, FL 2004 2005
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager - The design of the facility located at 320 Diamond Street. The facility if 5600 SF and houses six (6)
emergency workers. It has three (3) aparatus bays, masonry building with fiberglass shingle roofing on a pre-engineered wood
truss. Cost - $860,000.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
John Baer, AlA, NCARB, lEED AP
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Architect
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
30 2
15. FIRM NAME AND LOCATION (Cily and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor's of Science/ Architectural Studies/ University of
Milwaukee/ 1976
Associate's Degree/ Civil Structural Technology/ Northwest
Technical Institute/ 1972
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
American Institute of Architects - Fl, WI, OH, 10, MN, MI
18. OTHER PROFESSIONAL QUALIFICATIONS (Publicalions. Organizations. Training. Awards. elc)
Sandler Sales Training Program-2003/ Golden Trowel Award-1999
Building leadership Excellence - 2005
lEED AP (leadership in Energy & Environmental Design Approved Professional) - Since 2004
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
911/EOC Master Plan Critical Service Facility PROFESSIONAL SERVICES
2008
a. (3) BRIEF DESCRIPTION (Brief scope. size. COSI, elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Master planning studies were performed within a ten acre parcel of Twin Lakes Park, Sarasota Florida program
involved the development of a Fire Station, Emergency Operation Center, 911 call center, enterprise information
technologies department and an administration area.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Winter Springs Fire Station Master Planning PROFESSIONAL SERVICES
2008
b. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
CPH prepared conceptual plan for a new three story fire station facility of approximately 17,000 s.t. First floor consists of a three
truck apparatus bay, work out room, framing area and a day room facility for a fulltime staff. Second floor provides dormitory
space for 15 private bonk areas. Administration office areas well occupy the third floor area.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Deland New Public Works Complex PROFESSIONAL SERVICES
2008
C. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
The project included 12800 square feet of general building structure that will be a pre-engineered sign Ie story metal building.
CPH provided architectural and engineering services for this Design/Build project.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Immokalee Farmer's Market PROFESSIONAL SERVICES CONSTRUCTION (11 Applicable)
Immokalee, Fl 2007 2008
d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Architect - Architectural and Construction Inspection services for the storm damage repairs to the State Farmers Market
in Immokalee as a result of the Hurricanes experienced during the 2005 season. The anticipated total amount to be funded
through FEMA is approximately $10 Million.
(1) TITLE AND LOCATION (Cily and Slale) (2) YEAR COMPLETED
Palm Coast WTP PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Palm Coast, Fl 2006-2007 2007-2008
e. (3) BRIEF DESCRIPTION (Brief scope. size. cosl. elc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project Manager (Architectural) - CPH provided the architectural design in combination with engineering services for the Palm
Coast Water Treatment Plant. The architectural services included the design of four (4) structures totalling 30,000 SF,
encompassing office, laboratory, administration, and water treatment process/generator facility.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Thomas J. Galloway, PSM
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com tete one Section E for each ke
13. ROLE IN THIS CONTRACT
Project Surveyor
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
15 7
15. FIRM NAME AND LOCATION (City and State)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
B.S. Surveying and Mapping, University of Florida
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Professional Surveyor & Mapper LS 6549
18. OTHER PROFESSIONAL QUALIFICATIONS (Publica lions. Organizations. Training. Awards. etc.)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
Secret Promise PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Lake & Sumter County, FL
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
The project scope was to perform a boundary, topographic, wetland and tree survey of a 3,446:t acre site. CPH performed the
survey that included location of all improvements and topographic features. Oversee entire survey project.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Bell Shoals Road PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Hillsborough County, FL
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
The project scope was to perform a complete survey of Bell Shoals Road and prepared a control map, topographic survey and
parcel maps for road widening and utility location. Oversee entire survey project.
(1) TITLE AND LOCATION (City and Slale) (2) YEAR COMPLETED
Sylvan Lake Markham Forcemain PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Seminole County, FL
c. (3) BRIEF DESCRIPTION (Brief scope. size. cosl, elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
The project scope was to perform a topographic survey for underground utility design of Lake Markham Road. The right of way
was researched, established in the field and mapped for this project. Oversee entire survey project.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Widening of Madison Ave. PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Hillsborough County, FL
d. (3) BRIEF DESCRIPTION (Briefscope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
The project scope was to perform a topographic survey for the proposed widening of Madison Avenue. Oversee entire survey
project.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
1 sl Street - Sanford PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Seminole County, FL
e. (3) BRIEF DESCRIPTION (Brief scope. size, cas!. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
The project scope was to perform a topographic survey for design purposes for the proposed 2000 foot streetscape of 151 Street.
Oversee entire survey project.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Amy E. Daly
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com fete one Section E for each ke
13. ROLE IN THIS CONTRACT
Environmental Scientist
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
15 5
15. FIRM NAME AND LOCATION (Ci/y and Stale)
CPH Engineers, Inc.lMiami, Florida
16. EDUCATION (DEGREE AND SPECIALlZA nON)
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
B.S. Biological Sciences, 1991, FSU
M.BA 1997, FMU, Summa Cum Laude
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training. Awards. e/c)
U.S. Army Corps of Engineers Wetland Delineation Course, Florida Unified Mitigation Methodology Course, FDEP Certified
Stormwater Inspector, Prescribed Burner, NAUI Scuba Diver, Student Pilot
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (Ci/y and S/ale) (2) YEAR COMPLETED
Tradition, St. Lucie County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2003
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [ ] Check if project performed with currenl firm
Project Scientist responsible for habitat classification and mapping, wetland delineation and wetland functional analysis on this 2.043-acre property owned by Core
Communities, Inc. Directly responsible for field evaluation of 50+ acres of highly disturbed wetlands to serve as the basis for preparation of wetland restoration on
enhancement plans to offset unavoidable wetland losses. Prepared habitat descriptions, impact descriptions, and the WRAP analysis for the project's ERP
application. Acted as the project's ACOE liaison for permitting purposes. Designed mitigation monitoring methodology and performed baseline and annual
monitoring events and reports.
(1) TITLE AND LOCATION (City and Stale) (2) YEAR COMPLETED
East Central Florida Regional Mitigation Bank, Orange and Seminole Counties, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
1997
b. (3) BRIEF DESCRIPTION (Brief scope. size. cos!. e/c) AND SPECIFIC ROLE [ ] Check if project performed with cUrrent firm
Senior Ecologist responsible for agency and client coordination for the sale of mitigation credits. Additional responsibilities included environmental permitting, public
relations, mitigation monitoring. wildlife surveys, hydrology studies and water level monitoring. Conceptual planning of the 1 O,OOO-.:t acre regional bank's restoration
and management plan.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Jones/Fletcher Parcel PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Eminent Domain Services 2005
Orange County. Goldenrod, Florida
C. (3) BRIEF DESCRIPTION (Brief scope. size. cas!. elc) AND SPECIFIC ROLE [X ] Check if project performed with current firm
Preparation for e.xpcl1 testimony in condemnation proceedings for the l'onstruclioll of (Joldcmod Road in Orange County. Florida. Respollsihililies included re\"iew of availah1e
environmental information and assist and advise cOllllsel in preparation for interrogatory. deposition. trial. ell'. including tile preparation of necessary exhibits.
(1) TITLE AND LOCATION (CilyandStale) (2) YEAR COMPLETED
Mikler Property PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Preliminary Ecological Assessment 2004
Seminole County. (lviedo. Florida
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost, e/c) AND SPECIFIC ROLE [X ] Check if project performed with current firm
The (\.1ikler Property 5J-qcre project is located ill Slavin. Seminole Coullty. Florida south of Red Bug Lake Road. CPH conducted a field survey to map habitats and land uses.
characterize the quality of the on-site wetland quality and identify protected species or their hahitat. Provided the client with it report summarizing FLUCFCS Mapping. on-site soils.
permitting requirements. preliminary mitigation assessment and the potential for protected species to OCCllr 011 the property.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Orlando Utilities Commission Easement PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
Wetland Delinealion 2005
Osceola COllllty. Kissimmee. I:\orida
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost, elc.) AND SPECIFIC ROLE [X ] Check if project performed with current firm
CPH wa:-:; retained hy Thomas P. Callan. P.A. to delineate \velland areas \vithin a portion of the QUe power line corridor i.Hljacent to Interstate -+ in Polk County. CPII colIecteJ
hackgroulld environmental information to prepare for the wetland JelinL'ation performed in accordallL"e \....ith methodologies outline in the U.S. Army Corps of Engineers (ACOE)
Wetland Delineation Manual (In7) and tlie Florida Uuilied Wetlaud Ilelineation Methodolo~y (Chapter 62-.1-\0. F.A.C). Attendant with lhe wetland delineation. CPII assisted lhe
project surveyor to locate the \....etland delineation flags.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Aaron P. Moore
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
Com lete one Section E for each ke erson.
13. ROLE IN THIS CONTRACT
Environmental Scientist
14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
9 3
15. FIRM NAME AND LOCATION (Cilyandslate)
CPH Engineers, Inc./Miami, Florida
16. EDUCATION (DEGREE AND SPECIALIZATION)
B.S. Biology, University of Central Florida
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Southwest Florida Water Management District, Soils
Identification Course, Army Corps of Engineers
Management Training and Certified Delineator No. 3975
18. OTHER PROFESSIONAL QUALIFICATIONS (Pub/icalions. Organizations. Training. Awards. elc)
Florida Association of Environmental Professionals, CLE International- Florida Wetlands Annual Conference, Orange County
Christmas Creek Restoration Workshops, Wetland Training Institute-Plant Identification, Florida Citrus Sports, Home Builders
Association
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED
Palm Coast, Florida Consumptive Use Permit PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
On-going On-going
a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Wetland delineation and monitoring, apply and obtain wetland impact permits for utility infrastructure from Florida Department of
Environmental Protection, Army Corps of Engineers, Flagler County and the St. Johns River Water Management District, gopher tortoise
survey, permitting and relocation,. Complete wetland harm assessment for predicted withdrawals to the surficial aquifer and implement a
monitoring program for wetlands with potential for harm with annual reporting to the St. Johns River Water Management District.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Port Orange, Florida-Eastpointe Business Park PROFESSIONAL SERVICES CONSTRUCTION (If Appticab/e)
2006 2007
b. (3) BRIEF DESCRIPTION (Brief scope. size. COSI. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project scientist responsible fore performing an emergency gopher tortoise survey and relocation for the City of Port Orange after Florida
Fish and Wildlife Conservation Commission determined the project was in violation of State and Federal rules. Tasks included surveying
the project site for protected species, expediting the permitting process with the FFWCC, making arrangements to allow the project to
avoid being shut down and relocation of gopher tortoises.
(1) TITLE AND LOCATION (Cilyand Stale) (2) YEAR COMPLETED
Indian Trails Sports Complex Mitigation Area, Palm Coast, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Appticab/e)
On-going On-going
C. (3) BRIEF DESCRIPTION (Brief scope. size. cost. elc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project scientist in charge of producing a mitigation plan for the City of Palm Coast for utilization for various City public work
projects. Tasks included creating, operation, management and obtaining approval for a mitigation plan over 100 acres of City land
with a 1 O-year prescribed burning land management and monitoring program.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Belle Terre Parkway Improvements- Palm Coast, Florida PROFESSIONAL SERVICES CONSTRUCTION (If Appticab/e)
2007 On-going
d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project scientist in charge of obtaining Army Corp of Engineers and St. Johns River Water Management District Environmental
Resource Permits for roadway improvements to Belle Terre Parkway. Tasks included meetings with regulatory and city staff,
wetland delineation, impact analysis on flora and fauna, protected species surveys and mitigation planning.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Lake Alfred, Florida- Water Use Permit PROFESSIONAL SERVICES CONSTRUCTION (If Applicable)
2006 On-going
e. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm
Project scientist in charge of identifying wetlands within the City for continued monitoring during the duration of the Water Use
Permit. Tasks included writing an Environmental Monitoring Program detailing wetland impact analysis and monitoring
recommendations to the Southwest Florida Water Management District, meetings with District staff and field investigations and
wetland assessments.
STANDARD FORM 330 (1/2004) PAGE 2
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Complete one Section F for each proiect.)
21. TITLE AND LOCATION ICityandSlale)
Palm Coast Continuing Services
City of Palm Coast, FL
20. EXAMPLE PROJECT KEY
NUMBER
1
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Palm Coast
b. POINT OF CONTACT NAME
Mr. Richard Adams
a. POINT OF CONTACT TELEPHONE NUMBER
386.986.2350
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CPH has been providing continuing services for the City of Palm Coast in the management of their Capital Improvement Plan (CIP).
The firm has assisted the City in obtaining funds, evaluating current facilities, upgrades and refurbishments, and new facilities. The
team has performed work for three major functions for the City that include: Water/Wastewater, Stormwater, and Roadway projects.
The projects are outlined below.
Master Wastewater/Water Planning - The City of Palm Coast is purchasing the Florida Water Service's Palm Coast Utility System.
CPH has assisted the City in the evaluation of the existing utility system condition and determination of the utility system valuation.
CPH has also assisted the City in developing a 5-year Capital Improvement Program (CIP) of $110,000,500. The rapid growth within
in the Palm Coast service area was considered when the 5-Year CIP was developed. Revenue Bonds were used to pay for the
purchase and some of the Capital Improvements. Florida State Revolving Loan Funds will be used to pay for some of the wastewater
system improvements.
The Palm Coast 5-Year Water System Capital Improvements - The projects include New Florida Aquifer Wells, raw water mains,
RO Water Treatment Plant to 6.83 MGD, RO Concentrate Disposal, Shallow Wellfield expansion, Lime Softening WTP improvements,
R&R projects, and blanket projects.
The Palm Coast 5-Year Wastewater System Capital Improvements - The projects include Wastewater Treatment Plant expansion
from 4.0 MGD to 6.83 MGD, master pumping station, pumping station upgrades, pumping station generators, sewage force main
construction, private effluent pumping system expansion, reclaimed water mains, R&R projects and blanket projects.
Master Palm Coast Roadway Planning - CPH has assisted the City of Palm Coast with multiple tasks in data collection and
assessment of the roadway systems, which has contributed to the development of the CIP Program including roadway and storm
crossing condition analysis, development of asphalt resurfacing program (50 miles per year - three years completed) created city-wide
base mapping of all city streets, assisted in public works department identifying pavement deficiencies and flooding conditions.
Belle Terre Parkway Four-Ianing - CPH provided services including design, traffic services, landscape .. .
architecture, right-of-way acquisition, surveying and environmental services for the Belle Terre Parkway four-Ianing.
The project consisted of approximately 4.1 miles of a four-lane divided roadway, four 12-foot travel lanes and two
four-foot bicycle lanes.
Palm Coast Water Treatment Plant #3 - CPH provided complete design (architectural and civil design) and
construction management services for a new water treatment facility and administration offices. CPH prepared the initial project scope,
initial budgets, prepared surveys, designs, permitted the project with FDEP, FOOT, Army Corp of Engineers, Flagler County, City of
Palm Coast, and the St. Johns River Water Management District and provided full Construction Engineering and Inspection Services
for the project.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION ICity and Slale) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION ICily and Slale) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (Cily and Slate) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (Cilyand State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Como/ete one Section F for each proiect.)
21. TITLE AND LOCATION ICityandStale)
Winter Springs-Continuing Contract
Winter Springs, FL
20. EXAMPLE PROJECT KEY
NUMBER
2
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Winter Springs Mr. Kipton Lockcuff, P.E. 407.327.5989
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CPH has been providing services to the City for Winter Springs on an ongoing basis since 1974. The team has worked on a variety of
projects that include: Civil, architecture, landscape architecture, environmental, surveying, traffic/transportation, and construction
management. Projects performed for the City range from small to medium sized projects, including:
Winter Springs Reclaimed Water Improvements - The project involved preliminary and final design and construction for the
expansion of the distribution system into residential neighborhoods and to a golf course and percolation ponds. The expansion
consisted of 5,750 LF of 8" reclaimed water main, 600 LF of 6" main and 2,500 LF of 4" main.
Town Center Roadway Improvements - This project involved the engineering services for the design of the new Hickory Grove Park
Road and the reconstruction of Tuskawilla Road for the City of Winter Springs Town Center Project. The work included the relocation
and installation of approximately 1,850 LF of 12-inch and 200 LF of 8-inch water main and 4,960 LF of 8" gravity sewer.
Fisher Road Roadway Improvements - The Project consists of the paving, grading and installation of a drainage system on an
existing dirt road to improve the conditions within Fisher Road, Arnold Lane and Trade Winds Road. Work included paving of
approximately 4,350 lineal feet of dirt roads, excavation/grading of roadside swales and relocations of roadside improvements to
accommodate the construction of this project.
Winter Springs East Lift Station Analysis - This project was performed to determine the best way to divert the flow from 5 lift stations
from the gravity system where it experienced long detention times using a WaterCAD model. Various runs of the
model were performed to optimize routing.
Magnolia Square - CPH Services included the design of the streetscape, fountain, hardscape, furniture selection,
landscape, irrigation and CEI services. The fountain was developed as a focal element from both Tuskawilla and
Blumberg Avenue. Pavers were used to identify pedestrian crossings and different patterns were selected for
visual interest along the sidewalks and around the fountain.
Town Center Trail - The Winter Springs Town Center Trail is a pedestrian trail that will connect the cross State
Trail with the Winter Springs Town Center. The twelve foot trail is centered in the Blumberg Avenue median and
terminates at the magnolia square fountain. The trail was designed as a walk through a French Provincial
Garden.
...
RIM
~
-
~
-
Market Square - Market Square welcomes visitors into the Winter Springs Town Center and is a main entrance to
the City. CPH designed the fountain and the surrounding parcel terrace to be the focal element and gathering
place for the square. Site furnishings were selected to be both durable and aesthetically pleasing. CPH Services
Included: Park Plan, Hardscape, Planting Plan, Irrigation Plan, and Furniture Selection.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION ICily and State) (3) ROlE
b.
(1) FIRM NAME (2) FIRM LOCATION (Cily and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (Cily and Slate) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROlE
e.
(1) FIRM NAME (2) FIRM LOCATION ICity and State) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Comolete one Section F for each oro/ect.)
21. TITLE AND LOCATION (CiiyandState)
McDonald's Corporation
Throughout Florida
20. EXAMPLE PROJECT KEY
NUMBER
3
22. YEAR COMPLETED
PROFESSIONAL SERVICES 1 CONSTRUCTION (if Applicable)
Ongoing
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
850-487 -4322
a. PROJECT OWNER
McDonald's USA LLC
b. POINT OF CONTACT NAME
Ramon Santos
. I
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CPH has been working with McDonald's for 15+ years. Through this time, CPH has provided civil,
landscape, irrigation, surveying, architectural, and construction administration services on a continuing
basis for various new, re-builds, re-models, and re-image restaurant projects.
Working with the local region, CPH is involved in every aspect of the McDonald's process from working
with the real estate group early in site selection, through final walk-thru and store openings. Throughout
the process CPH has worked on:
. Conceptual plans
. Feasibility Studies
. Surveying Services
. Planning
. Re-zoning
. Land Use Changes
. Various Public Meeting Formats
. Landscape Architecture
. Civil Design
. Architectural Design
. Permitting
. Construction Administration
Along with working with the local regions, CPH has attended training with McDonald's throughout the nation. Finally, CPH has been
heavily involved with McDonald's Corporate Office in the implementation of new corporate programs including:
. Drive-thru Optimization
. Re-Image Program
. 2006 and 2007 Building Implementation
. ADA/AADAG Compliance and McDonald's Requirements
. High-Impact Re-image
. Brand Identity Integrity
. CBI - Combined Beverage Initiative
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (CilyandState) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (CilyandState) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Comolete one Section F for each oroiect.)
21. TITLE AND LOCATION (CityandSlale)
Volusia County -Continuing Contract
Vol usia County, FL
20. EXAMPLE PROJECT KEY
NUMBER
4
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Vol usia County Ms. Mary Anne Connors 386.736.5965
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CPH has been providing design and construction services to Vol usia County since 1974. Projects have included water, wastewater, stormwater,
roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture, planning, surveying,
environmental science, and construction administration. Some of the most recent projects for the County include:
Southwest Wastewater Treatment Plant- CPH provided planning, design (including environmental, civil, structural, electrical, etc.), permitting
(construction and operating), and services during construction for a .5 MGD wastewater treatment plant. The plant was designed for future expansion to
2 MGD. Initial effluent disposal was accomplished through use of on-site percolation ponds. The plant was designed to meet Class I Reliability Criteria.
The design includes: Headworks, Biological treatment system, Clarification, Chlorination, Sludge handling, Effluent pump station, Operations building,
and Percolation ponds.
Tenth Street - This task consisted of reconstructing 1.2 miles of an existing 2-lane rural road to a 4-lane divided urban road.
The proposed cross-section included four 12-ft lanes with 4-ft bike lanes in both directions. CPH also assisted Vol usia County
by preparing Right of Way Maps, and legal sketches and descriptions for the additional right of way and pond sites. The
Maintenance of Traffic was also a critical element to maintain and ensure full access to two schools, by both vehicles and
pedestrians, during construction.
~
Rhode Island Avenue- Task consisted of designing 1.4 miles of a new 2-lane divided rural road with a raised curb median, and re-design of an existing
signalized intersection at US 17-92. The design included a 2-lane cross section that can be widened in the future to a 4-lane urban road with minimal
construction. The stormwater management system was designed to collect and treat runoff from the current 2-lane rural road, but also has the capacity
and the infrastructure in place to handle the future widening utilizing the same storm water pipe/treatment system.
Spring Hill Park/Trail - Engineering and Landscape Architectural services for the expansion of Spring Hill Park. CPH provided
preliminary engineering and site planning along with construction estimates. Assistance was provided to the client in public
presentations and community meetings. The final product consisted of phased construction plans with final engineering, a
basketball court, restroom facility, tot lot, and pavilion. The existing walking trail was expanded to encompass the additional
park area. Park landscaping was improved to provide shade to trails and vegetation screening at parking areas.
Lake Monroe Trail - CPH prepared the design for a 12' wide multi-purpose trail approximately 2.4 miles in length which winds
through wetlands, wooded uplands and open pasture land. Designs of elevated wooden boardwalks were provided to reduce
impact to existing wetlands. The Trail begins at Lake Monroe Park and terminates at Gemini Springs Park. The project included
preparation of construction documents, coordination and permitting with the Water Management District as well as the Division
of Historical Resources and CPH also provided CEI Services.
".'~'~~ . .,.~"~~~~~,,{!~'
'-~:"'-l( ':tl'''j,.''
~ft.- \."" ...---..
~ .:- ~ - -,_~_tf~ . ~ .
...~~
.... ..~ I z:
:'~~I"li " ~ i.. <~~
ll'.J:~ ,:<!'.;' ..
"ll~tl f< "'J -", [.,.
.... TA:~ ~~~," !:.t.
~; ~;11 ;J"~.. ~~
~,-~. ...~"'!tit., ,~
.A:..'~" ~ I if;,
';-:--' - '""'\
_- II"" ';......~ __\-
-... ." - ,
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (Cily and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
1.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Complete one Section F for each proiect.J
21. TITLE AND LOCATION (City and State)
Sanford Continuing Contract
Sanford, Florida
20. EXAMPLE PROJECT KEY
NUMBER
5
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
1998 1999
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
407.330.5640
a. PROJECT OWNER
City of Sanford
b. POINT OF CONTACT NAME
Mr. Paul Moore, P.E. -
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CPH has been providing design and construction services to the City of Sanford since 1958. Projects have included water, wastewater, storm water,
roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture, planning, surveying,
environmental science, and construction administration. Some of the most recent projects for the City include:
1st Streetscape/Gateway Improvements - CPH is currently contracted with the City of Sanford to provide a streetscape
design package for a 6 block section of Historic First Street. The intent of this project is to closely match the streetscape of
improvements previously completed on First Street. Close coordination with City Staff involved in adjacent projects is of
utmost importance as we provide seamless transition from one phase to another. Plans and services include the
conceptual and final design of a Gateway feature introducing the historic district. CPH conducted design charettes to
ensure input and direction from City officials and other interested parties. CPH is currently providing final design services
for the final package that will include: Sidewalk and street curb layout, Planting and paver design, Parking layout, Irrigation
plans, Lighting and electrical plan, Site furniture selection and layout, Streetscape details, and Gateway entrance
architectural design details.
Sanford South Water Resource Center - This included the design and construction of the new Sanford South Water
Resource Center.The Sanford South uses energy efficient treatment processes and cutting-edge technologies to produce
a public access quality effluent. Reclaimed water is distributed throughout the City of Sanford service area consisting of
150 miles of distribution piping. Sanford South construction includes the following: Headworksstructure with odor control
system, Energy efficient oxidation ditch biological treatment systern, Office/laboratory building, Tertiavy filtration of the
secondary effluent, Sodium hypochlorite storage and handling facilities, Chlorine contact chamber, Effluent transfer pump
station, Solids handling facility and Class A sludge treatment system, Reclaimed water distribution pump station, City-wide
SCADA control systern, 3 MG reclairned water ground storage tank, 2 MG reject water ground storage tank, Internal
roadways, Fencing, Landscaping, Yard piping, and Storm water management system
St. Johns Parkway (Phases I, II & III) - CPH provided services for Phases I and II of the St. Johns Parkway project
consisting of widening existing Jewett Lane (renamed St. Johns Parkway) from the Smith Canal to approximately 400-feet
west of Meisch Road, resulting in 1,650 linear feet of new three-lane road. Major project components included: 28-foot
span (7-Ioot rise by 72-foot long) concrete arch culvert, Wingwalls at the Canal, Curb and Gutter, Sidewalk, Guardrail,
Aluminum Handrail, Storm Sewer, and Utilities construction of approximately 1,750 linear feet of new 12-inch water main
and 1,900 linear feet of new 8-inch reclaimed water rnain. Phase III of the St. Johns Parkway project additionally included
construction of approximately 2,800 linear feet of new four-lane divided roadway between Rinehart Road and Upsala Road.
City of Sanford - Bio-Solid Gasification System- CPH is working with Max West Environmental Systems Inc. to provide a Design, Build, Operate,
Finance project that will utilize the Cities current biosolids (sludge) to generate heat to operate their existing sludge driers. This unique system uses
Sanford's wastewater treatment plant's biosolids residuals to provide a green energy solution for the City. The Max West system will provide heat
through a gasification process that will eliminate the current use of natural gas to provide heat to the driers.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (Cily and State) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Complete one Section F for each proiect.)
21. TITLE AND LOCATION (CilyandSlale)
Orange County - Continuing Services Contract
Orange County, FL
20. EXAMPLE PROJECT KEY
NUMBER
6
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
Orange County Mr. Gary Morris, P.E. (407) 254-9711
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope. size, and cost)
CPH has been providing design and construction services to Orange County since 1985. Projects have included water, wastewater,
stormwater, roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture,
planning, surveying, environmental science, and construction administration. Some of the most recent projects for the County include:
S.R. 50 Utility Relocation Project - This project provides improvements to over 13 miles of the water distribution system and
wastewater collection and transmission system within the S.R. 50 Corridor, one of the busiest roads in Central Florida - which is being
expanded from 4-lanes to 6-Janes. The utility improvements include building new facilities as well as the removal of facilities in conflict
with the FOOT roadway design. The utility improvements will be constructed as part of the construction of the FOOT S.R. 50 projects
under a Joint Agreement between Orange County and FOOT. The construction documents meet FOOT plan preparation standards,
FOOT roadway design schedule and are coordinated with the FOOT road design and other utilities. The project includes the
installation of approximately 5.5 miles of 8,12,16,20 and 24-inch diameter water main and 7.7 miles of 4,8,12,16,20 and 30-inch
diameter FM along S.R. 50 from west S.R. 436 to Old Cheney Road (the Project). Connection of existing services and lateral mains
will be required while maintaining service to customers.
S.R. 528 Utility Relocation Project - This project was initiated by Orange County Utilities (OCU) to relocate a 16" forcemain as a
result of the bridge widening of SR 528 from 1-4 to the Airport Toll Plaza. The widening of the SR 528 had the potential to impact lines
owned and maintained by Orange County in Multiple locations. The challenges of this project included replacing the 16" forcemain with
a new 30" forcemain within the John Young Parkway right-of-way under the existing SR 528 bridge, having minimal disruption to the
roadway and still maintain operation to the existing forcemain. The project included two 54" jack and bores of 280 feet and 60 ft each,
three 16" lines stops, two large thrust blocks, and 1,500 feet of 30" forcemain. The construction documents meet FOOT and Turnpike
plan preparation standards, FOOT roadway design schedule, and were coordinated with the FOOT road design and other utilities.
Lake Standish Heights Water System Improvements - The Project consisted of the design of approximately 3600 LF of 6" and 8"
water main, fittings, valves and appurtenances to replace an existing substandard water distribution system. CPH prepared a
Preliminary Design Memorandum that outlined the pipeline alignment, permitting requirements, presentation of known future plans of
other utilities and agencies for the project area and presented conclusions and recommendations for the execution of the project. CPH
also provided construction drawings and technical specifications for the project prepared the appropriate applications and obtained the
water permit from FOEP and a utility permit from FOOT. CPH also performed limited inspection services, shop drawing review, post
design services, attendance at progress meetings, as-built drawings, clearance letter, certification of completion of construction,
substantial completion and final inspections.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (CilyandState) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
ComDlete one Section F for each Droiect.)
21. TITLE AND LOCATION (City and State)
City of Oviedo - Continuing Services Contract
Oviedo, FL
20. EXAMPLE PROJECT KEY
NUMBER
7
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME a. POINT OF CONTACT TELEPHONE NUMBER
City of Oviedo Mr. Tony Segreto (407) 971-5640
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CPH has been providing design and construction services to the City of Oviedo since 1991. Projects have included water, wastewater,
stormwater, roadway, parks, and trails. The team has provided services that include engineering, landscape architecture, architecture,
planning, surveying, environmental science, and construction administration. Some of the most recent projects for the City include:
Oviedo Water Treatment Plant - CPH provided design and construction services for a new well for the City of Oviedo. The project
was an implementation of a well which had been planned as a replacement for an existing well that had water quality degradation.
The new well was a larger diameter and shallower well in accordance with recommendations from the groundwater hydro-geologist
employed by the City.
Reclaimed Water Main Phase I and II - Phase I -The project consisted of engineering design and construction services for 2000
lineal feet of 20-inch and 7000 lineal feet of 24-inch reclaimed water main on Lockwood Boulevard from Mitchell Hammock to
Seminole Creek Drive, all within public rights-of-way. This reclaimed water system was started in 1992 as the City needed an alternate
source of water. The City does not have a readily available source of reclaimed water. CPH Engineers developed Reuse Feasibility
Plan for the city and obtained funding from FDEP SRF sources. The planning function was part of the overall needs to obtain funding.
The program is a joint effort with the City of Orlando (Iron Bridge Facility) and Seminole County. Phase 11- - The project consisted of
engineering design and construction services for 6600 LF of 16-inch water main, 800 LF of 1 O-inch water main, 9780 LF of 24-inch
reclaimed water main and 2900 LF of 24-inch directional bored reclaimed water main on Old Lockwood Road from McCulloch Road to
Lockwood Boulevard. This work was completely within public rights of way. Following the completion of the Phase I portion of the
project, the City of Oviedo proceeded with Phase II to connect to the City of Orlando main. Seminole County also desired to install a
water main in the same area and therefore, all of the coordination and layout for both lines was performed by CPH. CPH provided
drawings and technical specifications for the construction of this project and associated items. Plan and profile drawings were provided
based on topographical surveys. The alignment followed along existing roadway rights-of-way within Seminole County and was within
a developed urbanized area with roadway conflicts and traffic maintenance issues.
S.R. 426 Utility Relocation Project - This project is being constructed in conjunction with the FDOT widening project of 1.2 miles of
S.R. 426 and will be constructed as a Joint Project Agreement (JPA). The project includes the relocation of the City's 10" WM along
S.R. 426 that will be in conflict with FDOT's improvements. The existing 10" WM was replaced with a 16" main along the project route
which also included reconnection of existing water services. In addition to the WM relocations, an additional 12" WM was designed to
provide an interconnect to another City owned WM to improve reliably in the City's water system in this area. The City did not have
wastewater service in this area and the design included over 4,000 feet of a gravity sewer collection system with sewer lines ranging
from 8" to 15".
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (CityandSlale) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency. or 10 projects, If not specified.
Comolete one Section F for each oroiect.J
21. TITLE AND LOCATION (City and State)
City of Eustis - Continuing Services Contract
Eustis, FL
20. EXAMPLE PROJECT KEY
NUMBER
8
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Eustis Mr. Erwin Gajentan (352) 483-5480
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cosl)
CPH has been providing design and construction services to the City of Eustis since 1977. Projects have included water, wastewater,
stormwater, roadway, parks, and trails. The team has provided services that include engineering, landscape architecture,
architecture, planning, surveying, environmental science, and construction administration. Some of the most recent projects for the
City include:
City of Eustis Wastewater Treatment Facility Expansion - CPH provided master wastewater planning for the design service area,
design of the facility improvements (environmental, civil, structural, electrical, mechanical, etc.). and permitting for an expansion of
the City of Eustis Wastewater Treatment Facility. The existing facility used Trickling Filters to provide treatment of the incoming
wastewater prior to final disposal via hayfield irrigation. Improvements to the facility include the following: expansion and modification
of the biological treatment system (activated sludge process); the addition of secondary clarifiers, tertiary filters, RASNVAS facilities,
grit removal facilities, an effluent pump station; a mechanical barscreen system; rehabilitation and modification of the existing
treatment train; master pump station improvements; odor control systems; aerobic digester improvements; rehabilitation of existing lift
stations; and rerating of the hayfield effluent disposal system.
Master Water/Wastewater Plans - In 2005, CPH provided an update to the 2001 Eustis Master Water and Wastewater Plans with
the specific objective to address the issues of the wekiva Parkway and Protection Act, Past II of Chapter 369, F.S. The master plans
were developed to provide the City with the necessary tools to allow the utility systems to meet existing and future needs. We
developed short term and long range capital improvement plans that the City uses to create their capital budgets.
Master Storm water Plan Update - In 2005, CPH provided an update to the 2002 Eustis Stormwater Master Plan with the specific
objective to address the issues of The Wekiva Parkway and Protection Act, Part II of Chapter 369, F.S.; to identify the completion of
projects described and identified in the 2002 Plan; and to identify and describe projects that require attention for the future. The
Update also describes the National Pollution Discharge Elimination System (NPDES) program of which the City of Eustis is a party.
The report included a discussion of: 1) the completed projects with an update of the Tables containing the remaining projects; 2)
operation and maintenance costs; 3) opinion of probable construction cost for the improvements; and 4) routine maintenance.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
Complete one Section F for each proiect.)
21. TITLE AND LOCATION (City and State)
City of lake Alfred - Continuing Services Contract
Lake Alfred, FL
20. EXAMPLE PROJECT KEY
NUMBER
9
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER
City of Lake Alfred Mr. John Deaton (863) 291-5274
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
CPH has been providing design and construction services to the City of Lake Alfred since 1999. Projects have included water,
wastewater, stormwater, roadway, parks, and trails. The team has provided services that include engineering, landscape architecture,
architecture, planning, surveying, environmental science, and construction administration. Some of the most recent projects for the
City include:
lake Alfred WWTF Upgrade and Expansion Project - The project consisted of designing and permitting the replacement of the
existing 0.600 MGD trickling filter facility with a new 1.0 MGD modified activated sludge process WWTF. The design included adding a
new pretreatment headworks, a new 1.0 MGD rated WWTF (anoxic zones, aeration basins, and clarifiers), and new microscreen
filtration (two units). The existing trickling filter tank was converted to a 260,000 gallon equalization addition, the primary clarifier was
demolished, and the existing sand filters were modified and converted to a second chlorine contact chamber.
Echo Terrace Drainage Improvements - This project is located in the City of Lake Alfred, south of Lake Echo. The project area
consists of an existing single-family residential neighborhood with paved streets that prior to improvements did not have an existing
stormwater collection system. The runoff from the existing residential lots and the roads runs directly to a swale located east of the
end of N Echo Avenue and David Avenue. This swale discharges directly to a wetland area (Echo Terrace Wetland). In the existing
condition, the parcels located at the intersections of Cross Avenue and N Echo Avenue, and Cross Avenue and Davis Avenue
experience frequent flooding. The purpose of the project was to construct new inlets, storm sewer, and stormwater ponds in order to
alleviate flooding. CPH's services included design consisting of stormwater modeling and permitting through the SWFWMD, Polk
County, and FOOT, and assisting the City with securing CDBG funding (CDBG Disaster Recovery Initiative) and providing
documentation for City submittal to the Dept. of Community Affairs. Major construction items include installation of seven new storm
inlets, new storm sewer, and the construction of two new stormwater ponds and structures.
CUP Renewal - CPH assisted the City in obtaining a renewal of their water use permit. The main issue associated with this permit
dealt with the population projections, groundwater modeling, wetlands monitoring and mitigation, as well as conservation efforts.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (CilyandState) (3) ROLE
c.
(1) FIRM NAME (2) FIRM LOCATION (Ci/yandState) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and Slale) (3) ROLE
f.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency. or 10 projects, If not specified.
ComDlete one Section F for each oroiect.)
21. TITLE AND LOCATION (City and State)
City of Lake Mary- Continuing Services Contract
Lake Mary, FL
20. EXAMPLE PROJECT KEY
NUMBER
10
22. YEAR COMPLETED
PROFESSIONAL SERVICES I CONSTRUCTION (if Applicable)
Ongoing Ongoing
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT NAME a. POINT OF CONTACT TELEPHONE NUMBER
City of Lake Mary Mr. John Litton (407) 585-1419
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost)
CPH has been providing design and construction services to the City of Lake Mary since 1975. Projects have included water,
wastewater, stormwater, roadway, parks, and trails. The team has provided services that include engineering, landscape architecture,
architecture, planning, surveying, environmental science, and construction administration. Some of the most recent projects for the
City include:
Wood Street I Soldier's Creek Crossing Improvements - The Soldier's Creek crossing of Wood Street was subject to frequent
flooding since the existing culverts were severely undersized and the road grade was well below the flood stage, even during the 10
year storm. CPH's services including design and permitting through the SJRWMD. Even though other consultants had prepared for
Seminole County an overall Soldier's Creek Drainage Basin Study, CPH had to create a new model for the City's project (using ICPR)
and had to show that the new crossing and a change in the road grade (the road elevation was increased so it was above the 10 year
flood stage), did not increase or decrease channel flood elevations upstream and downstream of the crossing. The project consisted
of replacement of the existing creek crossing with a new triple barrel concrete box culvert including headwalls and wingwalls, roadway
re-grading and widening at the crossing, creek and embankment improvements, sodding, and other improvements associated with the
new crossing.
Sports Complex - CPH was retained by the City of Lake Mary to provide master planning, design, bidding and services during the
construction phase for this project. The primary facilities included a multi-purpose playing field, two softball fields, two Little LeaguelT-
ball fields, and one picnic area with a fishing pier. Support facilities and improvements consisted of a restroom facility, stabilized
parking area, site grading and development, and bleachers and bike racks. CPH provided coordination with other consultants,
including a landscape architect, a surveying firm, soils engineering, and an electrical engineer.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and Slate) (3) ROLE
a. CPH Engineers, Inc. Miami, FL Prime
(1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (Cityandslale) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (Clly and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (Cily and State) (3) ROLE
f.
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY 27. ROLE IN THIS 28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" section below before completing
PERSONNEL CONTRACT table. Place "X" under project key number for
(From Section E, (From Section E, participation in same or similar role.)
Block 12) Block 13) 1 2 3 4 5 6 7 8 9 10
David A. Gierach, P.E., CGC Principal-in-Charge X X X X X X X X X X
Todd H. Hendrix, P.E. Project Manager X X X X X X
Maria Zapata, P.E. Project Engineer X X
Jason L. James Project Designer X
Judson C. Pankey, P.E. Project Engineer X X X X X X X
Lawrence J. Morey, Jr., P.E. Project Engineer X X X X X X X X X X
Kurt R. Luman, Jr., P.E. Project Engineer X X X X X X X X X X
Jackeline V. Toledo, P.E., PTOE Traffic Engineer X X X X
Raghu K. Veturi, P.E, PTOE Traffic Engineer X X X X
Matthew Cushman, E. I. Project Engineer X X X X X X X X X X
Nicki M. McKenzie Project Designer X X X X X X X X X X
Charles A. Jensen, CET Project Designer X X X X X X X
Gerald M. Cox, CUC, CGC Project Designer/ Construction X X X X X X X X X X
N. Katriina Bowman, P.E., CCS Project Engineer X X X X X X X X X X
Rocco R. Nasso, P.E. Project Engineer X X X X X X X X X X
James K. Winter, RLA, CLARB Landscape Architect X X X X X X X X X X
Galen J. Pugh, RLA, AICP Landscape Architect X X X X X X X X X X
Victor Tan, AlA, NCARB Project Architect X X
John A. Baer, AlA, NCARB, Project Architect X X
LEED AP
Thomas J. Galloway, PSM Project Surveyor X X X X X X X X X X
Amy E. Daly Environmental Scientist X X X X X X X X X X
Aaron P. Moore Environmental Scientist X X X X X X X X X X
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 Palm Coast Continuing Services 6 Orange County - Continuing Services Contract
2 Winter Springs-Continuing Contract 7 City of Oviedo- Continuing Services Contract
3 McDonald's Corporation 8 City of Eustis - Continuing Services Contract
4 Vol usia County -Continuing Contract 9 City of Lake Alfred - Continuing Services Contract
5 Sanford Continuing Contract 10 City of Lake Mary- Continuing Services Contract
STANDARD FORM 330 (1/2004) PAGE 4
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31. SIGNATURE
32. DATE
/
~~~ ~ ....--
/;7
--"?
/~;c _
/'
5/24/2010
33. NAME AND TITLE
David Gierach, P.E./President
STANDARD FORM 330 (1/2004) PAGE 5
1. SOLICITATION NUMBER (II any)
ARCHITECT - ENGINEER QUALIFICATIONS
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
CPH Engineers, Inc. 1981
2b. STREET 5. OWNERSHIP
1992 SW 15t Street a. TYPE
2c. CITY 2d. STATE 2e. ZIP CODE Corporation
Miami FL 33135 b. SMALL BUSINESS STATUS
Yes
6a. POINT OF CONTACT NAME AND TITLE
David A. Gierach, P.E.!President 7. NAME OF FIRM (II block 2a is a branch ollice)
6b. TELEPHONE NUMBER 16C. E-MAIL ADDRESS
305.274.4805 NJindal@cphengineeers.com
8a. FORMER FIRM NAME(S) (If anv) 8b. YR. ESTABLISHED 8c. DUNS NUMBER
1981 058232349
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c. No. of Employees a. Profile c. Revenue
b. Discipline b. Experience Index Number
Code (1) FIRM (2) BRANCH Code (see below)
02 Administrative 45 1 C10 Commercial Building; (low rise); Shopping 6
12 Civil Engineer 58 2 C15 Construction Management 4
15 Construction Inspection 6 C18 Cost Estimating; Cost Engineering and 3
08 Draftsmen 8 E09 Environmental Impact Studies, Assessments 5
18 Estimators 4 H07 Highways; Streets; Airfield Paving; Parking 7
39 Landscape Architects 4 L03 Landscape Architecture 4
42 Mechanical Engineer 1 001 Office Building; Industrial Parks 4
47 Planner 6 P06 Planning (Site, Installation and Project) 7
52 Sanitary Engineer 3 R04 Recreational Facilities (Parks; Marinas; ect.) 3
57 Structural Engineer 1 R06 Rehabilitation (Buildings; Structures; 4
38 Surveyor 45 S04 Sewage Collection, Treatment & Disposal 8
60 Transportation Engineer 4 W02 Water Resources; Hydrology; Ground Water 6
23 Environmental Engineer 20 W03 Water Supply; Treatment and Distribution 6
08 Engineering/CADD Techs 30 1 L02 Land Surveying 6
12 Engineering Interns 25 1
02 Network Admin 2
08 Technical Assistants 20
24 Environmental Scientists 5
06 Architects 6
Other Employees 0
Total 293 5
11. ANNUAL AVERAGE PROFESSIONAL SERVICES PROFESSIONAL SERVICES REVENUE INDEX NUMBER
REVENUES OF FIRM
FOR LAST 3 YEARS 1. Less than $100.000 6. $2 million to less than $5 million
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
a. Federal Work 1 3. $250,000 to less than $500,000 8. $10 million to less than $25 million
10 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 5. $1 million to less than $2 million 10. $50 million or greater
c. Total Work 10
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
b. DATE
/
~.;'
~/.
~ /--" ~/~ 2'...-'~
/'
5/24/2010
c. NAME AND TITLE
David Gierach, P. E.!President
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 5/1/2004
STANDARD FORM 330 (1/2004) PAGE 6
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
I. This sworn statement is submitted to City of Sunny Isle Beach
by David Gierach, P.E., CGC
fur CPH Enqineers, Inc.
whose business address is 1992 SW 1st Street, Miami, Florida 33135
and (if applicable) its Federal Employer Identification Number (FEIN) is 59 - 2 068806
(IF the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:
2. I understand that a "public entity crime" as defined in Paragraph 287. I 33(1)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and directly
related to the transaction of business with any public entity or with an agency or political
subdivision of any other state or of the United States, including, but not limited to, any bid or
contract for goods or services to be provided to any public entity or an agency or political
subdivision of any other state or of the United States and involving antitrust, fraud, theft,
bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in Paragraph 287. I 33(1)(b), Florida
Statutes means a finding of guilt or a conviction of a public entity crime, with or without an
adjudication of guilt, in any federal or state trial court of record relating to charges brought by
indictment or information after July I, 1989, as a result of a jury verdict, nonjury trial, or
entry of a plea of guilty or nolo contenders.
4. I understand that an "affiliate" as defined in Paragraph 287.133(1)(a), Florida Statutes, means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the management of the
entity and who has been convicted of a public entity come. The term "affiliate" includes
those officers, directors, executives, paItners, shareholders, employees, members, and
agents who are active in the management of an affiliate. The ownership by one person of
shares constituting a controlling interest in another person, or a pooling of equipment or
income among persons when not for fair market value under an arm's length agreement,
shall be a prima facie case that one person controls another person. A person who
knowingly enters into a joint venture with a person who has been convicted of a public
entity crime in Florida during the preceding 36 months shall be considered an affiliate.
5. I understand that a "person" as defined in Paragraph 287.133(1)(e), Florida Statutes, means
any natural person or entity organized under the laws of any state or of the United States
with the legal power to enter into a binding contract and which bids or applies to bid on
contracts for the provision of goods or services let by a public entity, or which otherwise
transacts or applies to transact business with a public entity. The term "person" includes
those officers, directors, executives, partners, shareholders, employees, members, and
agents who are active in management of any entity.
1__
6. Based on information and belief, the statement which I have marked below is true in a
relation to the entity submitting this sworn statement. (Please indicate which one (I) of the
following three (3) statements is applicable.)
~ (1) Neither the entity submitting this sworn statement, nor any of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(2) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or any affiliate of the entity has been charged with and convicted of
a public entity crime within the past 36 months.
_(3) The entity submitting this sworn statement, or one or more of its officers, directors,
executives, partners, shareholders, employees, members, or agents who are active in the
management of the entity, or agents who are active in management of the entity, or any affiliate
of the entity has been charged with and convicted of a public entity crime within the past 36
months. However, there has been a subsequent proceeding before a Hearing Officers of the
State of Florida, Division of Administrative Hearings and the Final Order by the Hearing
Officer determined that it was not in the public interest to place the entity submitting this sworn
statement on the convicted vendor list. (Attached is a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH I (ONE) ABOVE IS
FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE
PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY
PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD
AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE
CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS
FORM. (' I
~~~---------
SIGNA TURE OF AFFIANT
David Gierach, P.E., CGC
(Printed or Typed Legal Name of Affiant)
State of Florida County of Seminole
Sworn to and subscribed before me this 24
day of
May
,2010 by
David Gierach, P.E., CGC
LttC~r
Notary's Name Printed, Stamped or Typed
Notary Seal:
",.~ Pt,w. Notary Public State 01 Florida
r~..... Tricia Hunt
~~ i My Commission DD674671
Of ",d' Exoires 07/13/2011 _
Personally Known:
x
or Produced Identification
Identification Produced
NON-COLLUSIVE AFFIDA VIT
State of Florida)
County of Seminole
David Gierach, P.E., CGC
and says that:
being first duly sworn, deposes
(I) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage
against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work;
(5) The price or prices quoted in the attached Bid are fair and proper and are not tainted by
any collusion, conspiracy, connivance, or unlawful agreement on the part of the Bidder or any
other of its agents, representativcs, owncrs, cmployees or parties in intcrcst, including this
Affiant. '- \
~~~~--~ David Gierach, P.E., CGC
SIGNA TURE OF AFFIANT (Printcd or Typed Legal Name of Affiant)
State of Florida County of Seminole
Sworn to and subscribcd beforc me this 24
day of
May
,2010 by
David Gierach, P.E., CGC
~cieJ&tJ:-:
Notary's Namc Printea, Stamped or Typed
Notary Seal:
Pcrsonally Known:
x
or Produccd Identification
. ,
i""Y "t\. Notary Public Stale 01 ?Iorida
T ricia Hunt
. ~ . My Commission 00674671
'\ ~
Off\.cJ'f Exoires 07/13/2011
Identification Produced
Addendum No. 1
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01 - Professional Engineering Services
RFQ NO.1 0-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes,
additions, deletions, clarifications, etc. to the Plans and Specifications, which in
accordance with the Contract Documents shall become a part of and have precedence
over anything shown or described otherwise.
1. Mandatory Pre-Submittal Conference Minutes (Q&A) May 5, 2010.
2. Sign-In Sheets from Mandatory Pre-Submittal Meeting.
~ \ \
/~~/ ~~~-----
David Gierach, P.E., CGC/President
5/24/2010
Date
Addendum No.1 Mandatory Pre-Submittal Conference QA 050SlOPage 1 of 6
Addendum No.2
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01 - Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
3. Q: Is the City asking for a Financial Statement/letter from an accountant for the
revenues for the past two years or will just the numbers suffice?
A: The numbers will suffice.
\
~ '
~,,~~~-----
David Gierach, P.E., CGC/President
5/24/2010
Date
END OF SECTION
Addendum No.3
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01 - Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
4. Q: On page 4 of RFQ 10-04-01, the City of Sunny Isles Beach requests "A list of all
projects (including government projects) completed or in process for the past five
years, and a corresponding list of client references with contact names and telephone
numbers." - Is this item excluded from the to-page limit?
A: Yes.
Q: On page 4 of RFQ 10-04-01, the City of Sunny Isles Beach requests "Proof of
authorization to transact business in Florida from the Florida Secretary of State, from
the prime as well as supporting firms." - Is this item also excluded from the 10-
page limit?
A: No.
Q: Should we include tax documents to indicate financial state of business? Or what
other document should we include to show financial state of business?
A: Tax documents are not necessary, just a brief summary will be fine.
Q: Do these count as part of the ten-page proposal?
A: Yes.
Q: Do the sworn statement and affidavit count as part of the ten-page proposal?
A: No.
~ ~ . I
~~/d4~~~
David Gierach, P.E., CGC/President
END OF SECTION
5/24/2010
Date
Addendum NO.4
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01- Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projects shall take note of the following changes, additions,
deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
5. Q: There is a discrepancy with the RFQ No. in the Professional Engineering Services
proposal for the City of Sunny Isles Beach. On the front, it mentions RFQ No. 10-04-01,
however, inside on the page that mentions 1.1 Introduction, 1.2 Time and Date of
Submittal, etc., there is another RFQ No. This time, RFQ No. 07-07-01. Which RFQ
No. do we use as correct?
A.' The correct number is thejirst one, the 10-04-01.
6. Q: Is SF 330 substituting SF 254 and SF 255? Or one can submit either the 330 or
254/255?
A: Eilhcr way, (he 330 or the 254 255
7. Q: Item 2 (list of projects for the past 5 years) can be covered through forms SF 330 and
254/255: is it going to be considered separately anyways?
A: Please list the relevanr projects in the ten pages (though they are not required to
be in (he same(ormat as the JJO 25-1 255).
8. Q: According to Addendum 3, proof of authorization to transact business in Florida &
the financials will count towards 10-page limitation. Please see Q 2 and Q4 on addendum.
We had understood at Pre-Proposal that these pages would not count. Please clarify.
A: The authorization themselves are not included in the ten pages, and though the
financial statements (tax return, etc.) are not either, a summary of the status of the
.firm should be. From past experience, it did not typically take the full allotment
of pages for firms to make their case. Please focus on the content.
/? , I
~~~~~~~,-----
David Gierach, P.E., CGC/President
END OF SECTION
5/24/2010
Date
OF SUl'l
Addendum NO.5
CITY OF SUNNY ISLES BEACH
RFQ NO. 10-04-01 - Professional Engineering Services
RFQ NO. 10-04-02 - Professional Architectural Services
To All Bidders:
Bidders for the above-referenced projeets shall take note of the following changes, additions,
deletions, clarifieations, etc. to the Plans and Specifications, which in accordance with the
Contract Documents shall become a part of and have precedence over anything shown or
described otherwise.
9. Q: In Addendum #4 for RFQ 10-04-01, in response to question #7, the City of Sunny
Isles Beach states that the list of projects for the past 5 years is included in the 10-
page limit.
However, this is contradictory to Addendum #3, in response to question #4, in which
the City states that the list of all projects for the past 5 years is excluded from the 10-
page limit.
Please clarify if the list of projects for the past 5 five years is included or excluded
from the 10-page limit.
A: My apology for the confusion. In the ten pages, you should include anything that you
feel is relevant to your presentation, obviously potentially including experience. The
formal presentation of experience for the past five years will not be counted as part of
the ten pages.
10. Q. If the contact person in Item 5 is also one of the listed in Item 6 (where all her
information will be shown), is necessary to write her information in Item 5?
A: You only need to slate Ihat they are one in {he same.
11. Q: We just received Addendum #4 for the RFQ #10-04-02 and there is conflicting
responses to critical submittal items. Addendum #4 question 7 indicates that relevant
projects are to be included in the ten pages BUT Addendum #3 question #4 indicates that
the project list are excluded from the 10 page requirement.
Also Addendum #4 question #8 indicates the authorizations are not included in the 10
pages but addendum #3 indicates proof of authorization is not excluded.
We would appreciate clarification so we can provide an acceptable submittal.
A: Confusion reigns, my apologies to all. The first response was incorrect, the proofs' will
not be counted as a part of the ten pages.
END OF SECTION
~~-~
David Gierach, P.E., CGC/President
5/24/2010
Date