HomeMy WebLinkAboutProject Caine Inc.
Solar Powered Photovoltaic
Systems (PV)
are rapidly becoming the
leading technology in
renewable energy.
Our solar powered
hot water heaters
and pool heaters are other
designs that save energy.
Project Caine is
committed to "Green" design
and a complete effort in
environmentally friendly and
economical solutions.
~-
"
Health Care Industry
In the health care
industry, precise
engineering and design
is critical.
Project Caine,
consistently delivers
on all design
and engineering
requirements for
these most
...
...
,..
11-.,
critical projects.
--,
_,'>: ,,'fi~i:~
~~~.
f;~~:,~
F:"
:. .;,."...
~y<~;
III a
a
responsive engineering
mechanical
plumbing
RECEIVED
MAY 2 6 J~~ ~Q~f(lt-
CITY OF SUNNY ISLt:::i BEACH
OFFICE OF THE CITY CLERK
electrical
ORIGINAL
fire protection
Inie9ratecf Design So[utions
~_J
FIRM OVERVIEW
Project Caine was formed in 2005 by a senior partner and board member of the largest MEP firm in
Florida. The founder has over 30 years of national and international design experience for various
project types such as single family residential, multi family residential, commercial, institutional,
healthcare, university, airports and ports.
The firm emphasizes responsiveness to client's needs & questions and specializes in timely and quality
design. Core services are Mechanical, Electrical, Plumbing and Fire Protection Engineering facility
design.
Several years ago the firm was approached by one of its clients to design a Solar Photovoltaic and
Solar Hot Water System for the project. We recognized this as the wave of the future and since have
increased our knowledge of solar designs as well as other renewable design specialties.
Revenue:
2009
2008
$404,065
$385,648
Principals:
Robert B Caine
President
1948 E. Sunrise Blvd. Suite 1
Fort Lauderdale FL 33304
954-767-8886
bcaine@proiectcaine.com
Company Address:
Project Caine
1948 E. Sunrise Blvd. Suite 1
Fort Lauderdale FL 33304
954-767-8886
954-767-9934 fax
Specialty Services:
Photovoltaic Systems (PV)
Card Key Energy Management Systems
Electric Car Charging Stations
Energy Audits
Fingerprint Identification Security Systems
Heat Recovery Systems
Motion Sensors for lights
Rainwater Reclamation Systems
Renewable Energy Certificates(RECs)
Waterless Urinals
Specifications:
AlA Master Specs
1948 East Sunrise Blvd. Suite 1, Fort Lauderdale, Florida 33304 ~ responsive eng ineeri ng
Phone: 954.767.88861 Fax: 954.767.99341 EFax: 954.337.4665 ......
~ "f1ectrCAINE
~(J~
Owner
City of Miami
Contact
Armando Rizzo
305.441.0888
Scope
Mechanical, Electrical, Plumbing
and Fire Protection Engineering
Completion Date
2007 - 2009
Owner
Broward County
Contact
Helena Saleta
954.357.6484
Scope
Mechanical, Electrical, Plumbing
and Fire Protection Engineering
Completion Date
On-going
Project Caine, Inc.
1948 East Sunrise Blvd.
Suite 1
Fort Lauderdale. FL 33304
Phone: 954.767.8886
Fax: 954.767.9934
E-fax: 954.337.4665
Project Caine, Inc. has been working on various projects for the City of Miami
including the renovation to the pump room for the Gibson Park Pool and the
renovation of the Roberto Clemente Community Center.
Projects to date furnished under this contract:
. Gibson Park Pool and Tennis Court
Completion Date (actual or estimated): 2009
Total Cost of Project: $200,000.00
. Miami Solid Waste Locker Room
Completion Date (actual or estimated): 2008
Total Cost of Project: $1,000,000.00
. Roberto Clemente Park Building Renovation
Completion Date (actual or estimated): 2007
Total Cost of Project: $2,000,000.00
Project Caine, Inc. has been working with Singer Architects and BHA
Architectural Consultants on two continuing services contracts with Broward
County for the past (2) two years. Projects include office renovations, escalator
upgrades, and an emergency system upgrade to the County Courthouse.
Projects to date furnished under this contract:
. Broward County Courthouse Renovation
Completion Date (actual or estimated): 2009
Total Cost of Project: $100,000.00
. Commissioner Ilene Lieberman's Office Renovation
Completion Date (actual or estimated): 2008
Total Cost of Project: $7,000,000.00
T responsive engineering
TO .e'Ct"TCAINE
~rJ~
Owner
Florida International University
Contact
Bob Griffith
305.348.4002
Scope
Mechanical, Electrical, Plumbing
and Fire Protection Engineering
Completion Date
Ongoing
Project Caine, Inc.
1948 East Sunrise Blvd.
Suite 1
Fort Lauderdale, FL 33304
Phone: 954.767.8886
Fax: 954.767.9934
E-fax: 954.337.4665
Project Caine, Inc. provided services on numerous small renovations at the
university which included laboratories, gymnasiums, offices and classrooms.
Projects to date furnished under this contract:
. FlU Engineering Building Roof Fans
Completion Date (actual or estimated): 2008
Total Cost of Project: $200,000.00
. FlU ECS Lab 162 Renovation
Completion Date (actual or estimated): 2008
Total Cost of Project: $200,000.00
. FlU Engineering Lab E109
Completion Date (actual or estimated): 2008
Total Cost of Project: $250,000.00
. FlU Fire Alarm System Upgrade
Completion Date (actual or estimated): 2008
Total Cost of Project: $300,000.00
. FlU Football Stadium
Completion Date (actual or estimated): 2009
Total Cost of Project: $2,500,000.00
. FlU Green Library Minor Renovation
Completion Date (actual or estimated): 2008
Total Cost of Project: $50,000.00
. FlU Office Renovations
Completion Date (actual or estimated): 2007
Total Cost of Project: $1,000,000.00
. FlU Recreational Facility
Completion Date (actual or estimated): 2007
Total Cost of Project: $1,000,000.00
T responsive engineering
ro4earCAINE
~(J~
Owner
Florida Atlantic University
Contact
Tom Donaudy
561-297-2663
Scope
Mechanical, Electrical, Plumbing
and Fire Protection Engineering
Completion Date
2007 - 2009
Owner
Broward County
Contact
William Ciudad-Real
407.702.6800
Scope
Mechanical, Electrical, Plumbing
and Fire Protection Engineering
Completion Date
Ongoing
Project Caine, Inc.
1948 East Sunrise Blvd.
Suite 1
Fort Lauderdale, FL 33304
Phone: 954.767.8886
Fax: 954.767.9934
E-fax: 954.337.4665
Project Caine, Inc. worked on numerous small renovation projects such as
offices, laboratories, gymnasiums, lighting studies, lightning protection studies and
design, fire alarm systems, etc.
Projects to date furnished under this contract:
. FAU 15 Kv Electrical Feeder
Completion Date (actual or estimated): 2009
Total Cost of Project: $200,000.00
. FAU Library Elevator Upgrade
Completion Date (actual or estimated): 2009
Total Cost of Project: $500,000.00
. FAU Lightning Protection Design
Completion Date (actual or estimated): 2008
Total Cost of Project: $100,000.00
. FAU Walkway Lighting Study
Completion Date (actual or estimated): 2007
Total Cost of Project: $100,000.00
As part of the Parson's team for the continuing services contract at the airport for
construction management, Project Caine, Inc. is contracted to provide services on
several projects.
Projects to date furnished under this contract:
. None
T responsive engineering
2010 FOR PROFIT CORPORATION ANNUAL REPORT
DOCUMENT# P05000009451
Entity Name: PROJECT CAINE, INC.
FILED
Jan 07, 2010
Secretary of State
Current Principal Place of Business:
New Principal Place of Business:
1948 E. SUNRISE BLVD.
SUITE 1
FT LAUDERDALE, FL 33304
Current Mailing Address:
New Mailing Address:
%DE LA 0 & MARKO, P.A.
3001 SW THIRD AVE
MIAMI, FL 33129
FEI Number: 20-2188140
FEI Number Applied For ( )
FEI Number Not Applicable ( )
Certificate of Status Desired ( )
Name and Address of Current Registered Agent:
Name and Address of New Registered Agent:
MARKO, DAVID EVERETT ESQ.
3001 SW THIRD AVE
MIAMI, FL 33129 US
The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both,
in the State of Florida.
SIGNATURE:
Electronic Signature of Registered Agent
Date
Election Campaign Financing Trust Fund Contribution ( ).
OFFICERS AND DIRECTORS:
Title:
Name:
Address:
City-Sl-Zip:
DPS
CAINE, ROBERT B PRES
1948 E. SUNRISE BLVD. SUITE 1
FT LAUDERDALE, FL 33304
I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic
signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver
or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or
on an attachment with all other like empowered.
SIGNATURE: ROBERT B CAINE
Electronic Signature of Signing Officer or Director
PRES
01107/2010
Date
ARCHITECT - ENGINEER QUALIFICATIONS
PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1, TITLE AND LOCATION (City and State)
Professional Engineering Services, City of Sunny Isles Beach, Miami-Dade County, Florida
2 PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
May 5th, 2010 RFO NO.1 0-04-01
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Robert B. Caine, PE, President
5. NAME OF FIRM
Project Caine, Inc.
6. TELEPHONE NUMBER
954-767 -8886
7. FAX NUMBER B, E-MAIL ADDRESS
954-767 -9934 bcaine@projectcaine.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
0:: '0::
w ZO
w Z 0>-- 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
:;; >-- uu
::,-~ m<(
1r =>0::
a. ~a. (1)>--
Project Caine, Inc. 1948 E. Sunrise Blvd.
a. X Suite 1 Engineering Services
Ft. Lauderdale, FL 33304
n CHECK IF BRANCH OFFICE
b.
n CHECK IF BRANCH OFFICE
c.
n CHECK IF BRANCH OFFICE
d.
n CHECK IF BRANCH OFFICE
e.
I n CHECK IF BRANCH OFFICE
f.
I n CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
(Attached)
AUTHORIZED FOR LOCAL REPRODUCTION
MANDATORY USE DATE OF FORM 6/2004
STANDARD FORM 330 (6/2004) PAGE 1
12, NAME
Robert B. Caine, PE
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13, ROLE IN THIS CONTRACT
Project Manager a, TOTAL
39
14, YEARS EXPERIENCE
I b. WITH C~RRENT FIRM
15, FIRM NAME AND LOCATION (City and State)
Project Caine, Inc., Fort Lauderdale, FL
16, EDUCATION (DEGREE AND SPECIALIZATION)
BSEE Villanova University, Electrical Engineering
17 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
FL # 37637 Electrical Engineer
18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc)
Articles published: INDUCED IMPEDENCE ON TRANSFORMER FEEDERS - EC&M, 1995; HIGH TECHNOLOGY BUILDINGS - Washington Business Joumal, 1990;
TELECOMMUNICA TlONS FOR BUILDINGS - Electrical Consultant, 1988; COMPUTERIZED ESTlMA TlNG - Electrical Consultant, 1987; UPS SYSTEMS DESIGN-
Electrical Systems Design, 1986
Lectures: Community Transportation Systems - EV (Electric Vehicle) Ready Broward, 1999; Electronic Technology for the Global Market Place - AlA conference 1996; Ice
Storage Systems - FEFPA conference 1995; Uniform Wiring Systems - FEFPA conference 1993; Intelligent Buildings - TMACA Conference 1988; Uniform Wiring Systems-
Chicago Conference 1989
Professional Organizations: Puerto Rico Hotel Association, IESNA (President and formed the PR section 2003), EV Ready Broward (Committee Chairman 2001), FES,
AlA, NSPE, TMACA (President 1988), IEEE, Madrid Chamber of Commerce 1991, American Club (Madrid 1990)
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Broward County Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Broward County, FL 2008 Varied
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE .lXJ Check it project performed with current firm
Project Caine, Inc, has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts
with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator
upgrade.
Role: Project Manager
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Fort Lauderdale Airport Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Fort Lauderdale, FL 2009 Varied
b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects
that they will be awarding to a total of 16 firms'.
Role: Project Manager
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Miami Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami, FL 2007 Varied
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the
Roberto Clemente Community Center.
Role: Project Manager
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FAU Continuing Engineering Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Boca Raton, FL 2007 Varied
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design,
fire alarm systems, etc.
Role: Project Manager
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FlU Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami, FL 2008 Varied
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm
Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms.
Role: Project Manager
STANDARD FORM 330 (6/2004) PAGE 1
Peter Worthy P .E.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13. ROLE IN THIS CONTRACT
Senior Mechanical Engineer
14. YEARS EXPERIENCE
a, TOTAL b. WITH CURRENT
FIRM
12. NAME
54
4
15. FIRM NAME AND LOCATION (City and State)
Pro'ect Caine / Fort Lauderdale FL
16. EDUCATION (DEGREE AND SPECIALIZATION)
BE Yale University / Mechanical Engineering
BS Yale University / Industrial Engineering
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
STRENGTHS Experience in mechanical work includes responsibility for design, field supervision and trouble - shooting of numerous
industrial and commercial heating, ventilating and air conditioning installations, ranging from minimum size of 50 tons to installations over
2,000 tons. Other systems include constant temperature - humidity rooms, low temperature rooms and freezers, low temperature rooms,
dust collections systems, high pressure piping systems, service piping, process piping and plumbing
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
FL # 12116 Mechanical Engineering
Background as a test and balance engineer as well as design engineer has led to forensic engineering experience as expert witness for
both plaintiff and defense attorneys. Areas of litigation have included piping system corrosion, high humidity's, mold and mildew,
pumping deficiencies, condensation and inadequate HVAC capacities. As test and balance consultant for Sroward County School System,
much work has been done in solving poor IAQ schools, both inadequate ventilation and mold and mildew.
PROFESSIONAL ORGANIZA TlONS
American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State)
Embraer Warehouse, 40,000 sf., Fort Lauderdale FL
a. [2J Check if project performed with current firm
(3) BRIEF OESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE
This project included 6 DX rooftop units and one split system for the office area. The project included a large warehouse
Area, offices, bathrooms and a secure storaqe area.
(1) TITLE AND LOCATION (City and State)
Copa Night Club, Fort Lauderdale FL
b. [2J Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Total renovation of the 20,000 sf night club which included two restaurants, 3 bars, restrooms and multi zoned DX -AC
units. The desiqn also included a smoke evacuation system.
(1) TITLE AND LOCATION (City and State)
Nanay Community Center, North Miami Beach, FL
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) ANa SPECIFIC ROLE [2J Check if project performed with current firm
This project consisted of the renovation of a two story, 8,000 sf community center. The renovation consisted of
designing a completely new AC system which consisted of 6 split systems and provisions for providing a new third floor
addition.
(1) TITLE AND LOCATION (City and State)
Cleveland Clinic Hospital Center (Weston, FL)
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [2J Check if project performed with current firm
Various Projects at the Hospital including a 1,000 sf addition to the Hospital Data Center. The design included a
standalone Liebert Unit, UPS system and a fire suppression system. We have also done an MRI suite an Endoscopy
suite, The Residents sleep area and a 40,000 sf tenant fit out for their data and call center.
(1) TITLE AND LOCATION (City and State)
Lake Point Towers, Singer Island, FL
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE D Check if project performed with current firm
The project consisted of the replacement of all the roof top AC equipment for a high rise condominium on Singer Island
FL.
STANDARD FORM 330 (1/2004) PAGE 2
12. NAME
Victoria N. Willis
E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13, ROLE IN THIS CONTRACT
Electrical Designer a, TOTAL
11
14, YEARS EXPERIENCE
I b, WITH C~RRENT FIRM
15. FIRM NAME AND LOCATION (City and State)
Project Caine, Inc., Fort Lauderdale, FL
16, EDUCATION (DEGREE AND SPECIALlZA TION)
Specialized Associates Degree Engineering &
Drafting
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
N/A
18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Extensive knowledge of low voltage systems such as fire alarm, voice, video and data networks. Thorough
understanding of computer networks.
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FlU Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami, FL 2008 Varied
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms.
Role: Electrical Designer
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
City of Miami Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami, FL 2007 Varied
b. (3) BRIEF DESCRIPTION (Bnef scope, size. cost, etc.) AND SPECIFIC ROLE . ~ Check if project performed with current firm
Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the
Roberto Clemente Community Center.
Role: Electrical Designer
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Fort Lauderdale Airport Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Fort Lauderdale, FL 2009 Varied
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ,~ Check if project performed with current firm
Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects
that they will be awarding to a total of 16 firms'.
Role: Electrical Designer
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FAU Continuing Engineering Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Boca Raton, FL 2007 Varied
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design,
fire alarm systems, etc.
Role: Electrical Designer
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Broward County Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Broward County, FL 2008 Varied
e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE _ ~ Check if project performed with current firm
Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts
with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator
upgrade.
Role: Electrical Designer
STANDARD FORM 330 (6/2004) PAGE 1
12. NAME
Tom Lund, CIPE
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
13, ROLE IN THIS CONTRACT
Plumbing & Fire Protection a. TOTAL
Engineering 23
14. YEARS EXPERIENCE
I b. WITH C~RRENT FIRM
15, FIRM NAME AND LOCATION (City and State)
Project Caine, Inc., Fort Lauderdale, FL
16. EDUCATION (DEGREE AND SPECIALlZA nON)
N/A
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
N/A
18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Certified in Plumbing Engineering, 1998
Articles published: Fire Protection Contractor
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FAU Continuing Engineering Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Boca Raton, FL 2007 Varied
a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm
Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design,
fire alarm systems, etc.
Role: Plumbing & Fire Protection Engineering
(1) TITLE ANO LOCATION (City and State) (2) YEAR COMPLETED
City of Miami Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami, FL 2007 Varied
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the
Roberto Clemente Community Center.
Role: Plumbing & Fire Protection Engineering
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Broward County Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Broward County, FL 2008 Varied
c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE _ ~ Check if project performed with current firm
Project Caine, Inc. has been working with Singer Architects and SHA Architectural Consultants on two continuing services contracts
with Sroward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator
upgrade.
Role: Plumbing & Fire Protection Engineering
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
FlU Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Miami, FL 2008 Varied
d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms.
Role: Plumbing & Fire Protection Engineering
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Fort Lauderdale Airport Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
Fort Lauderdale, FL 2009 Varied
e. (3) BRIEF DESCRIPTION (Bnef scope, size. cost, etc.) AND SPECIFIC ROLE ,~ Check If project performed With current firm
Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects
that they will be awarding to a total of 16 firms'.
Role: Plumbing & Fire Protection Engineering
STANDARD FORM 330 (6/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Comnlete one Section F for each Droiect. )
21, TITLE AND LOCATION (City and State)
Broward County Continuing Services Contract
Broward County, FL
20, EXAMPLE PROJECT
KEY NUMBER
1
22, YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008
Varied
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Broward County
b. POINT OF CONTACT
Helena Saleta
c, POINT OF CONTACT TELEPHONE NUMBER
954-357 -6484
24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT
Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two
continuing services contracts with Broward County for the past (2) two years. Projects include office
renovations, escalator upgrades, and an emergency generator upgrade.
Projects to date furnished under this contract:
· Broward County Courthouse Renovation
Completion Date (actual or estimated): 2009
Total Cost of Project: $100,000.00
· Commissioner Ilene Lieberman's Office Renovation
Completion Date (actual or estimated): 2008
Total Cost of Project: $7,000,000.00
Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services
Fort Lauderdale, FL 33304
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
STANDARD FORM 330 (6/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
{Present as many projects as requested by the agency, or 10 p~ojects, if not specified.
Complete one Section F for each nroiect.1
21. TITLE AND LOCATION (City and State)
City of Miami Continuing Services Contract
Miami, FL
20, EXAMPLE PROJECT
KEY NUMBER
2
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007
Varied
23. PROJECT OWNER'S INFORMATION
a, PROJECT OWNER
City of Miami
b, POINT OF CONTACT c, POINT OF CONTACT TELEPHONE NUMBER
rmando Rizo/ Rizo Carreno & Partners 305-441-0888
24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT
Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and
the renovation of the Roberto Clemente Community Center.
Projects to date furnished under this contract:
. Gibson Park Pool and Tennis Court
Completion Date (actual or estimated): 2009
Total Cost of Project: $200,000.00
. Miami Solid Waste Locker Room
Completion Date (actual or estimated): 2008
Total Cost of Project: $1,000,000.00
· Roberto Clemente Park Building Renovation
Completion Date (actual or estimated): 2007
Total Cost of Project: $2,000,000.00
Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services
Fort Lauderdale, FL 33304
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
STANDARD FORM 330 (6/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 p,?jects, if not specified.
Como/ete one Section F for each orojecl.)
21. TITLE AND LOCATION (City and State)
FAU Continuing Engineering Services Contract
Boca Raton, FL
20, EXAMPLE PROJECT
KEY NUMBER
3
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2007
Varied
23. PROJECT OWNER'S INFORMATION
a PROJECT OWNER
FAU
b, POINT OF CONTACT
Joe Colome/Colome & Assoc.
c, POINT OF CONTACT TELEPHONE NUMBER
561-833-9147
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT
Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning
protection studies and design, fire alarm systems, etc.
Projects to date furnished under this contract:
. FAU 15 Kv Electrical Feeder
Completion Date (actual or estimated): 2009
Total Cost of Project: $200,000.00
. FAU Library Elevator Upgrade
Completion Date (actual or estimated): 2009
Total Cost of Project: $500,000.00
. FAU Lightning Protection Design
Completion Date (actual or estimated): 2008
Total Cost of Project: $100,000.00
. FAU Walkway Lighting Study
Completion Date (actual or estimated): 2007
Total Cost of Project: $100,000.00
Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services
Fort Lauderdale, FL 33304
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
STANDARD FORM 330 (6/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
ComD/ete one Section F for each Droiect. J
21. TITLE AND LOCATION (City and State)
FlU Continuing Services Contract
Miami, FL
20, EXAMPLE PROJECT
KEY NUMBER
4
22, YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2008
Varied
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
FlU
b, POINT OF CONTACT
Bob Griffith
c. POINT OF CONTACT TELEPHONE NUMBER
305-348-4002
24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT
Numerous small renovations at the university which included laboratories, gymnasiums, offices and
classrooms.
Projects to date furnished under this contract:
. FlU Engineering Building Roof Fans
Completion Date (actual or estimated): N/A . FlU Football Stadium
Total Cost of Project: N/A Completion Date (actual or estimated): 2009
FlU ECS Lab 162 Renovation Total Cost of Project: $2,500,000.00
.
Completion Date (actual or estimated): 2008 . FlU Green Library Minor Renovation
Total Cost of Project: $200,000.00 Completion Date (actual or estimated): 2008
FlU Engineering Lab E109 Total Cost of Project: $50,000.00
.
Completion Date (actual or estimated): 2008 . FI U Office Renovations
Total Cost of Project: $250,000.00 Completion Date (actual or estimated): 2007
FlU Fire Alarm System Upgrade Total Cost of Project: $1,000,000.00
.
Completion Date (actual or estimated): 2008 . FlU Recreational Facility
Total Cost of Project: $300,000.00 Completion Date (actual or estimated): 2007
Total Cost of Project: $1,000,000.00
Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services
Fort Lauderdale, FL 33304
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
STANDARD FORM 330 (6/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
ComD/ete one Section F for each Droiect.)
21. TITLE AND LOCATION (CIty and State)
Fort Lauderdale Airport Continuing Services Contract
Fort Lauderdale, FL
20. EXAMPLE PROJECT
KEY NUMBER
5
22, YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009
Varied
23. PROJECT OWNER'S INFORMATION
a, PROJECT OWNER b, POINT OF CONTACT
Parsons Corporation William Ciudad-Real
24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT
c, POINT OF CONTACT TELEPHONE NUMBER
407 -702-6800
Part of the Parson's team for the continuing services contract at the airport for construction management.
There are numerous projects that they will be awarding to a total of 16 firms'.
Projects to date furnished under this contract:
. Embraer Warehouse and Hanger
Completion Date (actual or estimated): 2009
Total Cost of Project: $4,000,000.00
Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services
Fort Lauderdale, FL 33304
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (CIty and State) (3) ROLE
f.
STANDARD FORM 330 (6/2004) PAGE 1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
{Present as many projects as requested by the agency, or 10 projects, if not specified.
ComDlete one Section F for each Droiect.J
21, TITLE AND LOCATION (City and State)
Pompano Beach Continuing Services Contract
Pompano Beach, FL
20, EXAMPLE PROJECT
KEY NUMBER
6
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2009
Varied
23. PROJECT OWNER'S INFORMATION
a, PROJECT OWNER
Pompano Beach
b. POINT OF CONTACT
Michael Adelfe
c. POINT OF CONTACT TELEPHONE NUMBER
305-264-2557
24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT
This contract consists of various miscellaneous engineering projects as requested by the City of Pompano
Beach, FL.
Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services
Fort Lauderdale, FL 33304
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
d.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
e.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
f.
STANDARD FORM 330 (6/2004) PAGE 1
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
28. EXAMPLE PROJECTS LISTED IN SECTION F
26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT (Fill in "Example Projects Key" section below before completing table.
(From Section E, Block 12) (From Section E, Block 13) Place "X" under project key number for participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
Robert B. Caine, PE Project Manager X X X X X X
Victoria N. Willis Electrical Designer X X X X X X
Tom Lund, CIPE Plumbing & Fire Protection X X X X X X
Engineer
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 Broward County Courthouse Services Contract 6 Pompano Beach Continuing Services Contract
Broward County, FL Pompano Beach, FL
2 City of Miami Continuing Services Contract 7
Miami, FL
3 FAU Continuing Engineering Services Contract 8
Boca Raton, FL
4 FlU Continuing Services Contract 9
Miami, FL
5 Ft. Lauderdale Airport Continuing Services 10
Contract, Ft. Lauderdale, FL
STANDARD FORM 330 (6/2004) PAGE 2
H. ADDITIONAL INFORMATION
30, PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY, ATTACH SHEETS AS NEEDED
Project Caine, Inc. was formed in 2005 by a senior partner and board member of the largest MEP firm in
Florida. The founder has over 30 years of national and international design experience for various project
types such as single family residential, multi-family residential, commercial, institutional, healthcare,
university, airports and ports.
The firm emphasizes responsiveness to client's needs & questions and specializes in timely and quality
design. Core services are Mechanical, Electrical, Plumbing and Fire Protection Engineering facility design.
Several years ago the firm was approached by one of its clients to design a Solar Photovoltaic and Solar Hot
Water System for the project. We recognized this as the wave of the future and since have increased our
knowledge of solar designs as well as other renewable design specialties.
Specialty Services:
Photovoltaic Systems (PV)
Card Key Energy Management Systems
Electric Car Charging Stations
Energy Audits
Fingerprint Identification Security Systems
Heat Recovery Systems
Motion Sensors for lights
Rainwater Reclamation Systems
Renewable Energy Certificates (RECs)
Waterless Urinals
* Projects indicated with the asterisk were done by members of our staff while working for another company
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31, SIGNATURE
-fd 1-
IU",
05-21-10
33, NAME AND TITLE
Robert B. Caine, President
STANDARD FORM 330 (6/2004) PAGE 3
ARCHITECT-ENGINEER QUALIFICATIONS
1 SOLICITATION NUMBER (If any)
RFa NO.1 0-04-01
2a, FIRM (OR BRANCH OFFICE) NAME 3, YEAR ESTABLISHED 4, DUNS NUMBER
Project Caine, Inc. 2005
2b, STREET 5. OWNERSHIP
1948 E. Sunrise Blvd., Suite 1 a,TYPE
2c, CITY 12d, STATE 12e, ~;304 Corporation
Fort Lauderdale FL b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE Minority Business Enterprise
Robert B. Caine, PE, President 7. NAME OF FIRM (If block 2a is a branch office)
6b, TELEPHONE NUMBER I 6c. E-MAIL
954-767-8886 bcaine@projectcaine.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8e. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function c, No, of Employees a. Profile c. Revenue Index
Code b, Discipline Code b, Experience Number
(1) FIRM (2) BRANCH (see below)
A06 Airports Terminals etc. 3
02 Administrative 1 A11 Auditoriums and Theaters 2
21 Electrical Enaineer 1 C06 Churches Chapels 2
42 Mechanical Enaineer 1 C10 Comm. Buildinq (Low Rise) 2
14 Computer Ops/Network Manager 1 C11 Communitv Facilities 2
58 Enaineerina Technician 1 D07 Dininq Halls' Clubs' Restaurants 2
E02 Educational Facilities 3
F02 Field Houses' Gvms' Stadiums 3
F03 Fire Protection 2
H09 Hospital and Medical Facil. 3
H11 Housinq 2
L04 Libraries Museums 3
L05 Liqhtinq (Interior) 2
L06 Liahtina (Exterior) 2
001 Office Buildinqs Industrial 2
S06 Solar Enerav Utilization 3
W01 Warehouses & Depots 2
Other Employees
Total 5
11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER
SERVICES REVENUES OF FIRM 1. Less than $100,000 6. $2 million to less than $5 million
FOR LAST 3 YEARS
(Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million
3. $250,000 to less than $500,000 8. $10 million to less than $25 million
a. Federal Work 1 4. $500,000 to less than $1 million 9. $25 million to less than $50 million
b. Non-Federal Work 4 5. $1 million to less than $2 million 10. $50 million or greater
e. Total Work 5
PART 11- GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a SIGNATURE
I b, DATE
05-21-10
</4L
c, NAME AND TITLE ~,
Robert B. Caine, PE, President
STANDARD FORM 330 (6/2004) PAGE 1
~~
Robert B Caine PE LEED AP
Project Caine
1948 E. Sunrise Blvd. Suite 1
Fort Lauderdale FL 33304
954-767-8886
bcaine@proiectcaine.com
Robert Caine formed Project Caine in 2005. The firm emphasizes responsiveness to client's needs
and specializes in timely and quality design. Core services are Mechanical, Electrical, Plumbing and
Fire Protection Engineering.
Prior to forming Project Caine, Robert was a senior partner and board member of the largest MEP firm
in Florida. He has over 30 years of national and international design experience for various project
types such as single family residential, multi family residential, commercial, institutional, healthcare,
university, airports and ports. He has also developed an expertise in Green Building Design including
the design of Solar Photovoltaic systems.
Robert is a graduate of Villanova University with a degree in Electrical Engineering. He has published
numerous articles on electrical engineering and has given several lectures on various electrical
engineering topics
1946 East Sunrise Blvd. Suite 1, Fort Lauderdale. Florida 33304 ~ responsive engineering
Phone: 954.767.88861 Fax: 954.767.99341 EFax: 954.337.4665 ......
ro1ectfCAINE
~lJ1~~~~
filo~ rJr;::n'tI~mj\~~
Education
Bachelor of Science in Electrical
Engineering, Villanova University
Graduate Studies in
Telecommunications, George
Washington University
Registration
Professional Engineer - FL, DC,
PA,NC,SC,GA,MD,VA,AL
Professional Affiliations
Fort Lauderdale Chamber of
Commerce -Trustee
Broward Days
Fort Lauderdale Utility Advisory
Committee
Puerto Rico Hotel Association
IESNA (President and formed the
PR section 2003)
EV Ready Broward (Committee
Chairman 2001)
Florida Engineering Society (FES)
AlA
NSPE
TMACA (President 1988)
IEEE
Madrid Chamber of Commerce,
American Club (Madrid 1990)
Project Caine, Inc.
1948 East Sunrise Blvd.
Suite 1
Fort Lauderdale, FL 33304
Phone: 954.767.8886
Fax: 954.767.9934
E-fax: 954.337.4665
Background
Mr. Caine has a wealth of expertise in his field having over 30 years experience in
design and construction of sophisticated building systems. As President of Project
Caine, Inc., he brings the knowledge of starting and growing branch offices,
bringing divisions back to profitability, developing client loyalty, international
experience, and polished presentation skills. Understanding the need to establish
and nurture his client relationships, Mr. Caine prides himself in being involved from
the onset in all of the firm's projects.
Experience
Broward County Continuing Services Contract, Broward County, FL
Project Caine, Inc. has been working with Singer Architects and BHA
Architectural Consultants on two continuing services contracts with Broward
County for the past (2) two years. Projects include office renovations, escalator
upgrades, and an emergency system upgrade to the County Courthouse.
City of Miami Continuing Services Contract, Miami, FL
Project Caine, Inc. provided MEP services on various projects for the City of
Miami including the renovation to the pump room for the Gibson Park Pool and the
renovation of the Roberto Clemente Community Center.
Pompano Beach Continuing Services Contract, Pompano Beach, FL
Project Caine, Inc. is providing MEP services under this continuing services
contract which consists of various miscellaneous engineering projects.
Fort Lauderdale Airport Continuing Services Contract, Fort Lauderdale, FL
As part of the Parson's team for the continuing services contract at the airport for
construction management, Project Caine, Inc. provided MEP services on
numerous projects.
FAU Continuing Engineering Services Contract, Boca Raton, FL
Project Caine, Inc. provided MEP services on numerous small renovation projects
such as offices, laboratories, gymnasiums, lighting studies, lightning protection
studies and design, fire alarm systems, etc.
FlU Continuing Services Contract, Miami, FL
Project Caine, Inc. provided MEP services on numerous small renovations at the
university which included laboratories, gymnasiums, offices and classrooms.
City of Hallandale Adult Center, Hallandale, FL
Project Caine, Inc. provided MEP services for the electrical design included
lighting and power for two soccer fields and one baseball ball field. Lighting was
designed to achieve 50 foot-candles on the fields per the city standards.
T responsive engineering
rorectTCAINE
~~m
~~
Education
Yale University, B.E. Mechanical
Engineering, 1954
Yale University, B.S. Industrial
Administration, 1954
Professional Affiliations
Registrations
Professional Engineer, New
Jersey
Professional Engineer, Florida
Professional Engineer, Virginia
Technical Societies
American Society of Heating,
Refrigerating and Air Conditioning
Engineers, Inc.
Project Caine, Inc.
1948 East Sunrise Blvd.
Suite 1
Fort Lauderdale, FL 33304
Phone: 954.767.8886
Fax: 954.767.9934
E-fax: 954.337.4665
Experience
STRENGTHS
Experience in mechanical work includes responsibility for design, field supervision
and trouble - shooting of numerous industrial and commercial heating, ventilating
and air conditioning installations, ranging from minimum size of 50 tons to
installations over 2,000 tons. Other systems include constant temperature -
humidity rooms, low temperature rooms and freezers, low temperature rooms, dust
collections systems, high pressure piping systems, service piping, process piping
and plumbing
Background as a test and balance engineer as well as design engineer has led to
forensic engineering experience as expert witness for both plaintiff and defense
attorneys. Areas of litigation have included piping system corrosion, high
humidity's, mold and mildew, pumping deficiencies, condensation and inadequate
HVAC capacities. As test and balance consultant for Broward County School
System, much work has been done in solving poor IAQ schools, both inadequate
ventilation and mold and mildew.
Nanay Community Center, Hallandale, FL
Project Caine, Inc. provided the mechanical, electrical and plumbing engineering
for this project. The total project cost was $3M. This project consisted of the
renovation and upgrade of the existing community center in Miami Beach, Florida.
The project was on two stories and each about 4000 SF. The design provided for
the addition of another story and a roof deck. The project included a kitchen,
bathrooms, offices, recreational areas, and meeting rooms.
Cleveland Clinic MRI, Weston, FL.
The project consisted of the addition of a 1.5 T MRI suite to the first floor of the
hospital. Mechanical design included a new remote chiller to cool the magnet. The
electrical design consisted of direct and indirect lighting, power distribution and
state of the art low voltage systems. All equipment and materials had to be non-
ferrous. The room was designed with a magnetic shield surrounding it. This
project required an AHCA stage II stand up review.
T responsive engineering
~ .ewCAINE
1iarn~~
~1.I~mm~l?~
Education
Background
Certified in Plumbing Engineering
Professional Affiliations
Mr. Lund has over 25 years of professional experience. His diverse project
portfolio includes educational facilities, medical facilities, office buildings, senior
living facilities, airports, courthouses, and hospitality buildings.
American Society of Plumbing
Engineers
Experience
Broward County Continuing Services Contract, Broward County, FL
Project Caine, Inc. has been working with Singer Architects and BHA
Architectural Consultants on two continuing services contracts with Broward
County for the past (2) two years. Projects include office renovations, escalator
upgrades, and an emergency system upgrade to the County Courthouse.
City of Miami Continuing Services Contract, Miami, FL
Project Caine, Inc. provided MEP services on various projects for the City of
Miami including the renovation to the pump room fpr the Gibson Park Pool and the
renovation of the Roberto Clemente Community Center.
Pompano Beach Continuing Services Contract, Pompano Beach, FL
Project Caine, Inc. is providing MEP services under this continuing services
contract which consists of various miscellaneous engineering projects.
Fort Lauderdale Airport Continuing Services Contract, Fort Lauderdale, FL
As part of the Parson's team for the continuing services contract at the airport for
construction management, Project Caine, Inc. provided MEP services on
numerous projects.
FAU Continuing Engineering Services Contract, Boca Raton, FL
Project Caine, Inc. provided MEP services on numerous small renovation projects
such as offices, laboratories, gymnasiums, lighting studies, lightning protection
studies and design, fire alarm systems, etc.
FlU Continuing Services Contract, Miami, FL
Project Caine, Inc. provided MEP services on numerous small renovations at the
university which included laboratories, gymnasiums, offices and classrooms.
Project Caine, Inc.
1948 East Sunrise Blvd.
Suite 1
Fort Lauderdale, FL 33304
Phone: 954.767.8886
Fax: 954.767.9934
E-fax: 954.337.4665
City of Hallandale Adult Center, Hallandale, FL
Project Caine, Inc. provided MEP services for the electrical design included
lighting and power for two soccer fields and one baseball ball field. Lighting was
designed to achieve 50 foot-candles on the fields per the city standards.
T responsive engineering
~ "eaTCAINE
~~c~
~,~Iil""r,fI,~
Education
GMI Engineering & Management
Institute, 1999
Professional Affiliations
IEEE, Computer Society, 2001
Project Caine, Inc.
1948 East Sunrise Blvd.
Suite 1
Fort Lauderdale, FL 33304
Phone: 954.767.8886
Fax: 954.767.9934
E-fax: 954.337.4665
Experience
Broward County Continuing Services Contract, Broward County, FL
Project Caine, Inc. has been working with Singer Architects and BHA
Architectural Consultants on two continuing services contracts with Broward
County for the past (2) two years. Projects include office renovations, escalator
upgrades, and an emergency system upgrade at the County Courthouse.
Pompano Beach Continuing Services Contract, Pompano Beach, FL
Project Caine, Inc. is providing MEP services under this continuing services
contract which consists of various miscellaneous engineering projects.
FAU Continuing Engineering Services Contract, Boca Raton, FL
Project Caine, Inc. provided MEP services on numerous small renovation projects
such as offices, laboratories, gymnasiums, lighting studies, lightning protection
studies and design, fire alarm systems, etc.
FlU Continuing Services Contract, Miami, FL
Project Caine, Inc. provided MEP services on numerous small renovations at the
university which included laboratories, gymnasiums, offices and classrooms.
Sad kin Community Center, Lauderhill, FL
Project Caine, Inc. provided the mechanical, electrical, and plumbing design for
the renovation of the existing Sad kin Community Center. The project is a two-
story Community Center with approximately 6,800 SF on each floor. The existing
roof top units were replaced. Only selected areas were renovated. Most of the
first floor ceiling was replaced. New lighting was provided. New ductwork was
provided.
Nanay Community Center, Hallandale, FL
Project Caine, Inc. provided the mechanical, electrical and plumbing engineering
for this project. The total project cost was $3M. This project consisted of the
renovation and upgrade of the existing community center in Miami Beach, Florida.
The project was on two stories and each about 4000 SF. The design provided for
the addition of another story and a roof deck. The project included a kitchen,
bathrooms, offices, recreational areas, and meeting rooms.
T responsive engineering
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A
NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER
OATHS.
1. This sworn statement is submitted
to City of Sunny Isles Beach, Miami-Dade County, Florida
by Robert Caine, PE
for Project Caine Inc.
whose business address is
1948 E. Sunrise Blvd., Suite 1, Fort Lauderdale, FL 33304
and (if applicable) its Federal Employer Identification Number (FEIN)
202188140
(If the entity had no FEIN, include the Social Security Number of the individual
signing this sworn statement:
2. I understand that a "public entity crime" as defined in Section 287.133(1)(g), Florida
Statutes, means a violation of any state or federal law by a person with respect to and
directly related to the transaction of business with any public entity or with an agency
or political subdivision of any other state or of the United States, including, but not
limited to, any bid or contract for goods or services to be provided to any public entity
or an agency or political subdivision of any other state or of the United States and
involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or
material misrepresentation.
3. I understand that "convicted" or "conviction" as defmed in Section 287.133(l)(b),
Florida Statutes means a finding of guilt or a conviction of a public entity crime, with
or without an adjudication of guilt, in any federal or state trial court of record relating
to charges brought by indictment or information after July 1, 1989, as a result of a
jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders.
4, I understand that an "affiliate" as defined in Section 287.133(l)(a), Florida Statutes,
means:
a. A predecessor or successor of a person convicted of a public entity crime; or
b. An entity under the control of any natural person who is active in the
management of the entity and who has been convicted of a public entity crime.
The term "affiliate" includes those officers, directors, executives, partners,
shareholders, employees, members, and agents who are active in the management
of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons
when not for fair market value under an arm's length agreement, shall be a prima
12
facie case that one person controls another person. A person who knowingly
enters into a joint venture with a person who has been convicted of a public entity
crime in Florida during the preceding 36 months shall be considered an affiliate.
5. I understand that a "person" as defmed in Section 287.133(l)(e), Florida Statutes,
means any natural person or entity organized under the laws of any state or of the
United States with the legal power to enter into a binding contract and which bids or
applies to bid on contracts for the provision of goods or services let by a public entity,
or which otherwise transacts or applies to transact business with a public entity. The
term "person" includes those officers, directors, executives, partners, shareholders,
employees, members, and agents who are active in management of any entity.
6. Based on information and belief, the statement which I have marked below is true
in a relation to the entity submitting this sworn statement. (please indicate which
one (1) of the following three (3) statements is applicable.)
m (1) Neither the entity submitting this sworn statement, nor any of its officers,
directors, executives, partners, shareholders, employees, members, or agents who are
active in the management of the entity, or any affiliate of the entity has been charged
with and convicted of a public entity crime within the past 36 months.
il(2) The entity submitting this sworn statement, or one or more of its officers,
directors, executives, partners, shareholders, employees, members, or agents who are
active in the management of the entity, or any affiliate of the entity has been charged
with and convicted of a public entity crime within the past 36 months.
il(3) The entity submitting this sworn statement, or one or more of its officers,
directors, executives, partners, shareholders, employees, members, or agents who are
active in the management of the entity, or agents who are active in management of the
entity, or any affiliate of the entity has been charged with and convicted of a public
entity crime within the past 36 months. However, there has been a subsequent
proceeding before a Hearing Officers of the State of Florida, Division of Administrative
Hearings and the Final Order by the Hearing Officer determined that it was not in the
public interest to place the entity submitting this sworn statement on the convicted
vendor list. (Attached is a copy of the fmal order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE
CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN
PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT
THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR
IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED
INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM
REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A
CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN
SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY
CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.
13
Robert Caine. PE
(printed or Typed Legal Name of Affiant)
State of Florida of County of Miami-Dade :2;::: -1'-\~
Sworn to and subscribed before me this :..J day of
20lQ pb::-aJ- (' 6';--,\ e _ - - ,
NotarySeaJ: ~O, ~~
....~.:;..rrt".,. SUSAN A. HERNANDEZ
:~~'ib.''1;~ MY COMMISSION' DO 701326
~i.~.~1 EXPIRES: Augusl2. 2011
:"~~.9{.:n-~"" Bond~d Thru Notar; Public Underwriters
Notary's Name Printed, Stamped or Typed
Personally Known: ~ or Produced Identification IT
Identification Produced
by
14
NON-COUUSIVE AFFIDA VIT
State of
Florida)
County of
Miami-Dade)
Robert Caine, PE
being first duly sworn, deposes
and says that:
(1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has
submitted the attached Bid;
(2) He/she is fully informed respecting the preparation and contents of the attached Bid and
of all pertinent circumstances respecting such Bid;
(3) Such Bid is genuine and is not a collusive or sham Bid;
(4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives,
employees or parties in interest, including this affiant, have in any way colluded, conspired,
connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a
collusive or sham Bid in connection with the Work for which the attached Bid has been
submitted; or to refrain from bidding in connection with such Work; or have in any manner,
directly or indirectly, sought by agreement or collusion, or communication, or conference with
any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or
to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder,
or to secure through any collusion, conspiracy, connivance, or unlawful agreement any
advantage against the City of Sunny Isles Beach, Florida, or any person interested in the
proposed Work;
(5) e price or prices quoted in the attached Bid are fair and proper and are not tainted by
any co sion, ons acy, connivance, or unlawful agreement on the part of the Bidder or any
other f its ent representatives, owners, employees or parties in interest, including this
Affi t.
Robert Caine, PE, President
(Printed or Typed Legal Name of Affiant)
20
State of Florida of County of Miami - Dade
Sworn to and subscribed before me this d.. S day of 'o'r\ o/f
K~ C~n{ U
NO~:"~ (1, dJ~J-{
...~\r;:"" SUSAN A. HERNANDEZ
:~;l'~~. MY COMMISSION 11 00 701326
~.A~j EXPIRES: August 2,2011
'~~~~F,f:.n~""" Bondtld Thru Notary Public UndelWriters
Notary's Name Printed, Stamped or Typed
Personally Known: JZL or Produced Identification IT
Identification Produced
, 20_by
21
Colleges and Universities
r--~-
Visually inspiring and
environmentally conscious
are what Project Caine
captures on and off campus;
Achieving high marks
in creativity, form
and function.
C"_-
1.f~ ': I~) _.
Residential
Project Caine
engineers system designs
that reflect true attention
to detail, quality
and individual comfort.
Total integration of
mechanical, electrical,
plumbing and
fire protection is the
first consideration
in all of their
project solutions.