Loading...
HomeMy WebLinkAboutProject Caine Inc. Solar Powered Photovoltaic Systems (PV) are rapidly becoming the leading technology in renewable energy. Our solar powered hot water heaters and pool heaters are other designs that save energy. Project Caine is committed to "Green" design and a complete effort in environmentally friendly and economical solutions. ~- " Health Care Industry In the health care industry, precise engineering and design is critical. Project Caine, consistently delivers on all design and engineering requirements for these most ... ... ,.. 11-., critical projects. --, _,'>: ,,'fi~i:~ ~~~. f;~~:,~ F:" :. .;,."... ~y<~; III a a responsive engineering mechanical plumbing RECEIVED MAY 2 6 J~~ ~Q~f(lt- CITY OF SUNNY ISLt:::i BEACH OFFICE OF THE CITY CLERK electrical ORIGINAL fire protection Inie9ratecf Design So[utions ~_J FIRM OVERVIEW Project Caine was formed in 2005 by a senior partner and board member of the largest MEP firm in Florida. The founder has over 30 years of national and international design experience for various project types such as single family residential, multi family residential, commercial, institutional, healthcare, university, airports and ports. The firm emphasizes responsiveness to client's needs & questions and specializes in timely and quality design. Core services are Mechanical, Electrical, Plumbing and Fire Protection Engineering facility design. Several years ago the firm was approached by one of its clients to design a Solar Photovoltaic and Solar Hot Water System for the project. We recognized this as the wave of the future and since have increased our knowledge of solar designs as well as other renewable design specialties. Revenue: 2009 2008 $404,065 $385,648 Principals: Robert B Caine President 1948 E. Sunrise Blvd. Suite 1 Fort Lauderdale FL 33304 954-767-8886 bcaine@proiectcaine.com Company Address: Project Caine 1948 E. Sunrise Blvd. Suite 1 Fort Lauderdale FL 33304 954-767-8886 954-767-9934 fax Specialty Services: Photovoltaic Systems (PV) Card Key Energy Management Systems Electric Car Charging Stations Energy Audits Fingerprint Identification Security Systems Heat Recovery Systems Motion Sensors for lights Rainwater Reclamation Systems Renewable Energy Certificates(RECs) Waterless Urinals Specifications: AlA Master Specs 1948 East Sunrise Blvd. Suite 1, Fort Lauderdale, Florida 33304 ~ responsive eng ineeri ng Phone: 954.767.88861 Fax: 954.767.99341 EFax: 954.337.4665 ...... ~ "f1ectrCAINE ~(J~ Owner City of Miami Contact Armando Rizzo 305.441.0888 Scope Mechanical, Electrical, Plumbing and Fire Protection Engineering Completion Date 2007 - 2009 Owner Broward County Contact Helena Saleta 954.357.6484 Scope Mechanical, Electrical, Plumbing and Fire Protection Engineering Completion Date On-going Project Caine, Inc. 1948 East Sunrise Blvd. Suite 1 Fort Lauderdale. FL 33304 Phone: 954.767.8886 Fax: 954.767.9934 E-fax: 954.337.4665 Project Caine, Inc. has been working on various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the Roberto Clemente Community Center. Projects to date furnished under this contract: . Gibson Park Pool and Tennis Court Completion Date (actual or estimated): 2009 Total Cost of Project: $200,000.00 . Miami Solid Waste Locker Room Completion Date (actual or estimated): 2008 Total Cost of Project: $1,000,000.00 . Roberto Clemente Park Building Renovation Completion Date (actual or estimated): 2007 Total Cost of Project: $2,000,000.00 Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency system upgrade to the County Courthouse. Projects to date furnished under this contract: . Broward County Courthouse Renovation Completion Date (actual or estimated): 2009 Total Cost of Project: $100,000.00 . Commissioner Ilene Lieberman's Office Renovation Completion Date (actual or estimated): 2008 Total Cost of Project: $7,000,000.00 T responsive engineering TO .e'Ct"TCAINE ~rJ~ Owner Florida International University Contact Bob Griffith 305.348.4002 Scope Mechanical, Electrical, Plumbing and Fire Protection Engineering Completion Date Ongoing Project Caine, Inc. 1948 East Sunrise Blvd. Suite 1 Fort Lauderdale, FL 33304 Phone: 954.767.8886 Fax: 954.767.9934 E-fax: 954.337.4665 Project Caine, Inc. provided services on numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. Projects to date furnished under this contract: . FlU Engineering Building Roof Fans Completion Date (actual or estimated): 2008 Total Cost of Project: $200,000.00 . FlU ECS Lab 162 Renovation Completion Date (actual or estimated): 2008 Total Cost of Project: $200,000.00 . FlU Engineering Lab E109 Completion Date (actual or estimated): 2008 Total Cost of Project: $250,000.00 . FlU Fire Alarm System Upgrade Completion Date (actual or estimated): 2008 Total Cost of Project: $300,000.00 . FlU Football Stadium Completion Date (actual or estimated): 2009 Total Cost of Project: $2,500,000.00 . FlU Green Library Minor Renovation Completion Date (actual or estimated): 2008 Total Cost of Project: $50,000.00 . FlU Office Renovations Completion Date (actual or estimated): 2007 Total Cost of Project: $1,000,000.00 . FlU Recreational Facility Completion Date (actual or estimated): 2007 Total Cost of Project: $1,000,000.00 T responsive engineering ro4earCAINE ~(J~ Owner Florida Atlantic University Contact Tom Donaudy 561-297-2663 Scope Mechanical, Electrical, Plumbing and Fire Protection Engineering Completion Date 2007 - 2009 Owner Broward County Contact William Ciudad-Real 407.702.6800 Scope Mechanical, Electrical, Plumbing and Fire Protection Engineering Completion Date Ongoing Project Caine, Inc. 1948 East Sunrise Blvd. Suite 1 Fort Lauderdale, FL 33304 Phone: 954.767.8886 Fax: 954.767.9934 E-fax: 954.337.4665 Project Caine, Inc. worked on numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. Projects to date furnished under this contract: . FAU 15 Kv Electrical Feeder Completion Date (actual or estimated): 2009 Total Cost of Project: $200,000.00 . FAU Library Elevator Upgrade Completion Date (actual or estimated): 2009 Total Cost of Project: $500,000.00 . FAU Lightning Protection Design Completion Date (actual or estimated): 2008 Total Cost of Project: $100,000.00 . FAU Walkway Lighting Study Completion Date (actual or estimated): 2007 Total Cost of Project: $100,000.00 As part of the Parson's team for the continuing services contract at the airport for construction management, Project Caine, Inc. is contracted to provide services on several projects. Projects to date furnished under this contract: . None T responsive engineering 2010 FOR PROFIT CORPORATION ANNUAL REPORT DOCUMENT# P05000009451 Entity Name: PROJECT CAINE, INC. FILED Jan 07, 2010 Secretary of State Current Principal Place of Business: New Principal Place of Business: 1948 E. SUNRISE BLVD. SUITE 1 FT LAUDERDALE, FL 33304 Current Mailing Address: New Mailing Address: %DE LA 0 & MARKO, P.A. 3001 SW THIRD AVE MIAMI, FL 33129 FEI Number: 20-2188140 FEI Number Applied For ( ) FEI Number Not Applicable ( ) Certificate of Status Desired ( ) Name and Address of Current Registered Agent: Name and Address of New Registered Agent: MARKO, DAVID EVERETT ESQ. 3001 SW THIRD AVE MIAMI, FL 33129 US The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Election Campaign Financing Trust Fund Contribution ( ). OFFICERS AND DIRECTORS: Title: Name: Address: City-Sl-Zip: DPS CAINE, ROBERT B PRES 1948 E. SUNRISE BLVD. SUITE 1 FT LAUDERDALE, FL 33304 I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: ROBERT B CAINE Electronic Signature of Signing Officer or Director PRES 01107/2010 Date ARCHITECT - ENGINEER QUALIFICATIONS PART 1 - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1, TITLE AND LOCATION (City and State) Professional Engineering Services, City of Sunny Isles Beach, Miami-Dade County, Florida 2 PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER May 5th, 2010 RFO NO.1 0-04-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Robert B. Caine, PE, President 5. NAME OF FIRM Project Caine, Inc. 6. TELEPHONE NUMBER 954-767 -8886 7. FAX NUMBER B, E-MAIL ADDRESS 954-767 -9934 bcaine@projectcaine.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 0:: '0:: w ZO w Z 0>-- 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT :;; >-- uu ::,-~ m<( 1r =>0:: a. ~a. (1)>-- Project Caine, Inc. 1948 E. Sunrise Blvd. a. X Suite 1 Engineering Services Ft. Lauderdale, FL 33304 n CHECK IF BRANCH OFFICE b. n CHECK IF BRANCH OFFICE c. n CHECK IF BRANCH OFFICE d. n CHECK IF BRANCH OFFICE e. I n CHECK IF BRANCH OFFICE f. I n CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) PAGE 1 12, NAME Robert B. Caine, PE E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Project Manager a, TOTAL 39 14, YEARS EXPERIENCE I b. WITH C~RRENT FIRM 15, FIRM NAME AND LOCATION (City and State) Project Caine, Inc., Fort Lauderdale, FL 16, EDUCATION (DEGREE AND SPECIALIZATION) BSEE Villanova University, Electrical Engineering 17 CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) FL # 37637 Electrical Engineer 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc) Articles published: INDUCED IMPEDENCE ON TRANSFORMER FEEDERS - EC&M, 1995; HIGH TECHNOLOGY BUILDINGS - Washington Business Joumal, 1990; TELECOMMUNICA TlONS FOR BUILDINGS - Electrical Consultant, 1988; COMPUTERIZED ESTlMA TlNG - Electrical Consultant, 1987; UPS SYSTEMS DESIGN- Electrical Systems Design, 1986 Lectures: Community Transportation Systems - EV (Electric Vehicle) Ready Broward, 1999; Electronic Technology for the Global Market Place - AlA conference 1996; Ice Storage Systems - FEFPA conference 1995; Uniform Wiring Systems - FEFPA conference 1993; Intelligent Buildings - TMACA Conference 1988; Uniform Wiring Systems- Chicago Conference 1989 Professional Organizations: Puerto Rico Hotel Association, IESNA (President and formed the PR section 2003), EV Ready Broward (Committee Chairman 2001), FES, AlA, NSPE, TMACA (President 1988), IEEE, Madrid Chamber of Commerce 1991, American Club (Madrid 1990) 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Broward County Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Broward County, FL 2008 Varied a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE .lXJ Check it project performed with current firm Project Caine, Inc, has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator upgrade. Role: Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fort Lauderdale Airport Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Fort Lauderdale, FL 2009 Varied b. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects that they will be awarding to a total of 16 firms'. Role: Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Miami Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami, FL 2007 Varied c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the Roberto Clemente Community Center. Role: Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FAU Continuing Engineering Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Boca Raton, FL 2007 Varied d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. Role: Project Manager (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FlU Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami, FL 2008 Varied e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc) AND SPECIFIC ROLE ~ Check it project performed with current firm Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. Role: Project Manager STANDARD FORM 330 (6/2004) PAGE 1 Peter Worthy P .E. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13. ROLE IN THIS CONTRACT Senior Mechanical Engineer 14. YEARS EXPERIENCE a, TOTAL b. WITH CURRENT FIRM 12. NAME 54 4 15. FIRM NAME AND LOCATION (City and State) Pro'ect Caine / Fort Lauderdale FL 16. EDUCATION (DEGREE AND SPECIALIZATION) BE Yale University / Mechanical Engineering BS Yale University / Industrial Engineering 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) STRENGTHS Experience in mechanical work includes responsibility for design, field supervision and trouble - shooting of numerous industrial and commercial heating, ventilating and air conditioning installations, ranging from minimum size of 50 tons to installations over 2,000 tons. Other systems include constant temperature - humidity rooms, low temperature rooms and freezers, low temperature rooms, dust collections systems, high pressure piping systems, service piping, process piping and plumbing 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) FL # 12116 Mechanical Engineering Background as a test and balance engineer as well as design engineer has led to forensic engineering experience as expert witness for both plaintiff and defense attorneys. Areas of litigation have included piping system corrosion, high humidity's, mold and mildew, pumping deficiencies, condensation and inadequate HVAC capacities. As test and balance consultant for Sroward County School System, much work has been done in solving poor IAQ schools, both inadequate ventilation and mold and mildew. PROFESSIONAL ORGANIZA TlONS American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) Embraer Warehouse, 40,000 sf., Fort Lauderdale FL a. [2J Check if project performed with current firm (3) BRIEF OESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE This project included 6 DX rooftop units and one split system for the office area. The project included a large warehouse Area, offices, bathrooms and a secure storaqe area. (1) TITLE AND LOCATION (City and State) Copa Night Club, Fort Lauderdale FL b. [2J Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Total renovation of the 20,000 sf night club which included two restaurants, 3 bars, restrooms and multi zoned DX -AC units. The desiqn also included a smoke evacuation system. (1) TITLE AND LOCATION (City and State) Nanay Community Center, North Miami Beach, FL c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) ANa SPECIFIC ROLE [2J Check if project performed with current firm This project consisted of the renovation of a two story, 8,000 sf community center. The renovation consisted of designing a completely new AC system which consisted of 6 split systems and provisions for providing a new third floor addition. (1) TITLE AND LOCATION (City and State) Cleveland Clinic Hospital Center (Weston, FL) d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [2J Check if project performed with current firm Various Projects at the Hospital including a 1,000 sf addition to the Hospital Data Center. The design included a standalone Liebert Unit, UPS system and a fire suppression system. We have also done an MRI suite an Endoscopy suite, The Residents sleep area and a 40,000 sf tenant fit out for their data and call center. (1) TITLE AND LOCATION (City and State) Lake Point Towers, Singer Island, FL e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE D Check if project performed with current firm The project consisted of the replacement of all the roof top AC equipment for a high rise condominium on Singer Island FL. STANDARD FORM 330 (1/2004) PAGE 2 12. NAME Victoria N. Willis E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Electrical Designer a, TOTAL 11 14, YEARS EXPERIENCE I b, WITH C~RRENT FIRM 15. FIRM NAME AND LOCATION (City and State) Project Caine, Inc., Fort Lauderdale, FL 16, EDUCATION (DEGREE AND SPECIALlZA TION) Specialized Associates Degree Engineering & Drafting 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Extensive knowledge of low voltage systems such as fire alarm, voice, video and data networks. Thorough understanding of computer networks. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FlU Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami, FL 2008 Varied a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. Role: Electrical Designer (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Miami Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami, FL 2007 Varied b. (3) BRIEF DESCRIPTION (Bnef scope, size. cost, etc.) AND SPECIFIC ROLE . ~ Check if project performed with current firm Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the Roberto Clemente Community Center. Role: Electrical Designer (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fort Lauderdale Airport Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Fort Lauderdale, FL 2009 Varied c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ,~ Check if project performed with current firm Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects that they will be awarding to a total of 16 firms'. Role: Electrical Designer (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FAU Continuing Engineering Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Boca Raton, FL 2007 Varied d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. Role: Electrical Designer (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Broward County Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Broward County, FL 2008 Varied e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE _ ~ Check if project performed with current firm Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator upgrade. Role: Electrical Designer STANDARD FORM 330 (6/2004) PAGE 1 12. NAME Tom Lund, CIPE E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 13, ROLE IN THIS CONTRACT Plumbing & Fire Protection a. TOTAL Engineering 23 14. YEARS EXPERIENCE I b. WITH C~RRENT FIRM 15, FIRM NAME AND LOCATION (City and State) Project Caine, Inc., Fort Lauderdale, FL 16. EDUCATION (DEGREE AND SPECIALlZA nON) N/A 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18, OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Certified in Plumbing Engineering, 1998 Articles published: Fire Protection Contractor 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FAU Continuing Engineering Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Boca Raton, FL 2007 Varied a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE U Check if project performed with current firm Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. Role: Plumbing & Fire Protection Engineering (1) TITLE ANO LOCATION (City and State) (2) YEAR COMPLETED City of Miami Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami, FL 2007 Varied b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the Roberto Clemente Community Center. Role: Plumbing & Fire Protection Engineering (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Broward County Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Broward County, FL 2008 Varied c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE _ ~ Check if project performed with current firm Project Caine, Inc. has been working with Singer Architects and SHA Architectural Consultants on two continuing services contracts with Sroward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator upgrade. Role: Plumbing & Fire Protection Engineering (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FlU Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Miami, FL 2008 Varied d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. Role: Plumbing & Fire Protection Engineering (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fort Lauderdale Airport Continuing Services Contract PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) Fort Lauderdale, FL 2009 Varied e. (3) BRIEF DESCRIPTION (Bnef scope, size. cost, etc.) AND SPECIFIC ROLE ,~ Check If project performed With current firm Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects that they will be awarding to a total of 16 firms'. Role: Plumbing & Fire Protection Engineering STANDARD FORM 330 (6/2004) PAGE 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Comnlete one Section F for each Droiect. ) 21, TITLE AND LOCATION (City and State) Broward County Continuing Services Contract Broward County, FL 20, EXAMPLE PROJECT KEY NUMBER 1 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 Varied 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Broward County b. POINT OF CONTACT Helena Saleta c, POINT OF CONTACT TELEPHONE NUMBER 954-357 -6484 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency generator upgrade. Projects to date furnished under this contract: · Broward County Courthouse Renovation Completion Date (actual or estimated): 2009 Total Cost of Project: $100,000.00 · Commissioner Ilene Lieberman's Office Renovation Completion Date (actual or estimated): 2008 Total Cost of Project: $7,000,000.00 Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services Fort Lauderdale, FL 33304 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT {Present as many projects as requested by the agency, or 10 p~ojects, if not specified. Complete one Section F for each nroiect.1 21. TITLE AND LOCATION (City and State) City of Miami Continuing Services Contract Miami, FL 20, EXAMPLE PROJECT KEY NUMBER 2 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 Varied 23. PROJECT OWNER'S INFORMATION a, PROJECT OWNER City of Miami b, POINT OF CONTACT c, POINT OF CONTACT TELEPHONE NUMBER rmando Rizo/ Rizo Carreno & Partners 305-441-0888 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the Roberto Clemente Community Center. Projects to date furnished under this contract: . Gibson Park Pool and Tennis Court Completion Date (actual or estimated): 2009 Total Cost of Project: $200,000.00 . Miami Solid Waste Locker Room Completion Date (actual or estimated): 2008 Total Cost of Project: $1,000,000.00 · Roberto Clemente Park Building Renovation Completion Date (actual or estimated): 2007 Total Cost of Project: $2,000,000.00 Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services Fort Lauderdale, FL 33304 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 p,?jects, if not specified. Como/ete one Section F for each orojecl.) 21. TITLE AND LOCATION (City and State) FAU Continuing Engineering Services Contract Boca Raton, FL 20, EXAMPLE PROJECT KEY NUMBER 3 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 Varied 23. PROJECT OWNER'S INFORMATION a PROJECT OWNER FAU b, POINT OF CONTACT Joe Colome/Colome & Assoc. c, POINT OF CONTACT TELEPHONE NUMBER 561-833-9147 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. Projects to date furnished under this contract: . FAU 15 Kv Electrical Feeder Completion Date (actual or estimated): 2009 Total Cost of Project: $200,000.00 . FAU Library Elevator Upgrade Completion Date (actual or estimated): 2009 Total Cost of Project: $500,000.00 . FAU Lightning Protection Design Completion Date (actual or estimated): 2008 Total Cost of Project: $100,000.00 . FAU Walkway Lighting Study Completion Date (actual or estimated): 2007 Total Cost of Project: $100,000.00 Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services Fort Lauderdale, FL 33304 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. ComD/ete one Section F for each Droiect. J 21. TITLE AND LOCATION (City and State) FlU Continuing Services Contract Miami, FL 20, EXAMPLE PROJECT KEY NUMBER 4 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 Varied 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER FlU b, POINT OF CONTACT Bob Griffith c. POINT OF CONTACT TELEPHONE NUMBER 305-348-4002 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. Projects to date furnished under this contract: . FlU Engineering Building Roof Fans Completion Date (actual or estimated): N/A . FlU Football Stadium Total Cost of Project: N/A Completion Date (actual or estimated): 2009 FlU ECS Lab 162 Renovation Total Cost of Project: $2,500,000.00 . Completion Date (actual or estimated): 2008 . FlU Green Library Minor Renovation Total Cost of Project: $200,000.00 Completion Date (actual or estimated): 2008 FlU Engineering Lab E109 Total Cost of Project: $50,000.00 . Completion Date (actual or estimated): 2008 . FI U Office Renovations Total Cost of Project: $250,000.00 Completion Date (actual or estimated): 2007 FlU Fire Alarm System Upgrade Total Cost of Project: $1,000,000.00 . Completion Date (actual or estimated): 2008 . FlU Recreational Facility Total Cost of Project: $300,000.00 Completion Date (actual or estimated): 2007 Total Cost of Project: $1,000,000.00 Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services Fort Lauderdale, FL 33304 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. ComD/ete one Section F for each Droiect.) 21. TITLE AND LOCATION (CIty and State) Fort Lauderdale Airport Continuing Services Contract Fort Lauderdale, FL 20. EXAMPLE PROJECT KEY NUMBER 5 22, YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 Varied 23. PROJECT OWNER'S INFORMATION a, PROJECT OWNER b, POINT OF CONTACT Parsons Corporation William Ciudad-Real 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT c, POINT OF CONTACT TELEPHONE NUMBER 407 -702-6800 Part of the Parson's team for the continuing services contract at the airport for construction management. There are numerous projects that they will be awarding to a total of 16 firms'. Projects to date furnished under this contract: . Embraer Warehouse and Hanger Completion Date (actual or estimated): 2009 Total Cost of Project: $4,000,000.00 Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services Fort Lauderdale, FL 33304 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (CIty and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT {Present as many projects as requested by the agency, or 10 projects, if not specified. ComDlete one Section F for each Droiect.J 21, TITLE AND LOCATION (City and State) Pompano Beach Continuing Services Contract Pompano Beach, FL 20, EXAMPLE PROJECT KEY NUMBER 6 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 Varied 23. PROJECT OWNER'S INFORMATION a, PROJECT OWNER Pompano Beach b. POINT OF CONTACT Michael Adelfe c. POINT OF CONTACT TELEPHONE NUMBER 305-264-2557 24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT This contract consists of various miscellaneous engineering projects as requested by the City of Pompano Beach, FL. Services Provided: Mechanical, Electrical, Plumbing and Fire Protection Engineering 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Project Caine, Inc. 1948 E. Sunrise Blvd. Engineering Services Fort Lauderdale, FL 33304 (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (6/2004) PAGE 1 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 28. EXAMPLE PROJECTS LISTED IN SECTION F 26. NAMES OF KEY PERSONNEL 27. ROLE IN THIS CONTRACT (Fill in "Example Projects Key" section below before completing table. (From Section E, Block 12) (From Section E, Block 13) Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Robert B. Caine, PE Project Manager X X X X X X Victoria N. Willis Electrical Designer X X X X X X Tom Lund, CIPE Plumbing & Fire Protection X X X X X X Engineer 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Broward County Courthouse Services Contract 6 Pompano Beach Continuing Services Contract Broward County, FL Pompano Beach, FL 2 City of Miami Continuing Services Contract 7 Miami, FL 3 FAU Continuing Engineering Services Contract 8 Boca Raton, FL 4 FlU Continuing Services Contract 9 Miami, FL 5 Ft. Lauderdale Airport Continuing Services 10 Contract, Ft. Lauderdale, FL STANDARD FORM 330 (6/2004) PAGE 2 H. ADDITIONAL INFORMATION 30, PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY, ATTACH SHEETS AS NEEDED Project Caine, Inc. was formed in 2005 by a senior partner and board member of the largest MEP firm in Florida. The founder has over 30 years of national and international design experience for various project types such as single family residential, multi-family residential, commercial, institutional, healthcare, university, airports and ports. The firm emphasizes responsiveness to client's needs & questions and specializes in timely and quality design. Core services are Mechanical, Electrical, Plumbing and Fire Protection Engineering facility design. Several years ago the firm was approached by one of its clients to design a Solar Photovoltaic and Solar Hot Water System for the project. We recognized this as the wave of the future and since have increased our knowledge of solar designs as well as other renewable design specialties. Specialty Services: Photovoltaic Systems (PV) Card Key Energy Management Systems Electric Car Charging Stations Energy Audits Fingerprint Identification Security Systems Heat Recovery Systems Motion Sensors for lights Rainwater Reclamation Systems Renewable Energy Certificates (RECs) Waterless Urinals * Projects indicated with the asterisk were done by members of our staff while working for another company I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31, SIGNATURE -fd 1- IU", 05-21-10 33, NAME AND TITLE Robert B. Caine, President STANDARD FORM 330 (6/2004) PAGE 3 ARCHITECT-ENGINEER QUALIFICATIONS 1 SOLICITATION NUMBER (If any) RFa NO.1 0-04-01 2a, FIRM (OR BRANCH OFFICE) NAME 3, YEAR ESTABLISHED 4, DUNS NUMBER Project Caine, Inc. 2005 2b, STREET 5. OWNERSHIP 1948 E. Sunrise Blvd., Suite 1 a,TYPE 2c, CITY 12d, STATE 12e, ~;304 Corporation Fort Lauderdale FL b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Minority Business Enterprise Robert B. Caine, PE, President 7. NAME OF FIRM (If block 2a is a branch office) 6b, TELEPHONE NUMBER I 6c. E-MAIL 954-767-8886 bcaine@projectcaine.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8e. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function c, No, of Employees a. Profile c. Revenue Index Code b, Discipline Code b, Experience Number (1) FIRM (2) BRANCH (see below) A06 Airports Terminals etc. 3 02 Administrative 1 A11 Auditoriums and Theaters 2 21 Electrical Enaineer 1 C06 Churches Chapels 2 42 Mechanical Enaineer 1 C10 Comm. Buildinq (Low Rise) 2 14 Computer Ops/Network Manager 1 C11 Communitv Facilities 2 58 Enaineerina Technician 1 D07 Dininq Halls' Clubs' Restaurants 2 E02 Educational Facilities 3 F02 Field Houses' Gvms' Stadiums 3 F03 Fire Protection 2 H09 Hospital and Medical Facil. 3 H11 Housinq 2 L04 Libraries Museums 3 L05 Liqhtinq (Interior) 2 L06 Liahtina (Exterior) 2 001 Office Buildinqs Industrial 2 S06 Solar Enerav Utilization 3 W01 Warehouses & Depots 2 Other Employees Total 5 11. ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 6. $2 million to less than $5 million FOR LAST 3 YEARS (Insert revenue index number shown at right) 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million a. Federal Work 1 4. $500,000 to less than $1 million 9. $25 million to less than $50 million b. Non-Federal Work 4 5. $1 million to less than $2 million 10. $50 million or greater e. Total Work 5 PART 11- GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a SIGNATURE I b, DATE 05-21-10 </4L c, NAME AND TITLE ~, Robert B. Caine, PE, President STANDARD FORM 330 (6/2004) PAGE 1 ~~ Robert B Caine PE LEED AP Project Caine 1948 E. Sunrise Blvd. Suite 1 Fort Lauderdale FL 33304 954-767-8886 bcaine@proiectcaine.com Robert Caine formed Project Caine in 2005. The firm emphasizes responsiveness to client's needs and specializes in timely and quality design. Core services are Mechanical, Electrical, Plumbing and Fire Protection Engineering. Prior to forming Project Caine, Robert was a senior partner and board member of the largest MEP firm in Florida. He has over 30 years of national and international design experience for various project types such as single family residential, multi family residential, commercial, institutional, healthcare, university, airports and ports. He has also developed an expertise in Green Building Design including the design of Solar Photovoltaic systems. Robert is a graduate of Villanova University with a degree in Electrical Engineering. He has published numerous articles on electrical engineering and has given several lectures on various electrical engineering topics 1946 East Sunrise Blvd. Suite 1, Fort Lauderdale. Florida 33304 ~ responsive engineering Phone: 954.767.88861 Fax: 954.767.99341 EFax: 954.337.4665 ...... ro1ectfCAINE ~lJ1~~~~ filo~ rJr;::n'tI~mj\~~ Education Bachelor of Science in Electrical Engineering, Villanova University Graduate Studies in Telecommunications, George Washington University Registration Professional Engineer - FL, DC, PA,NC,SC,GA,MD,VA,AL Professional Affiliations Fort Lauderdale Chamber of Commerce -Trustee Broward Days Fort Lauderdale Utility Advisory Committee Puerto Rico Hotel Association IESNA (President and formed the PR section 2003) EV Ready Broward (Committee Chairman 2001) Florida Engineering Society (FES) AlA NSPE TMACA (President 1988) IEEE Madrid Chamber of Commerce, American Club (Madrid 1990) Project Caine, Inc. 1948 East Sunrise Blvd. Suite 1 Fort Lauderdale, FL 33304 Phone: 954.767.8886 Fax: 954.767.9934 E-fax: 954.337.4665 Background Mr. Caine has a wealth of expertise in his field having over 30 years experience in design and construction of sophisticated building systems. As President of Project Caine, Inc., he brings the knowledge of starting and growing branch offices, bringing divisions back to profitability, developing client loyalty, international experience, and polished presentation skills. Understanding the need to establish and nurture his client relationships, Mr. Caine prides himself in being involved from the onset in all of the firm's projects. Experience Broward County Continuing Services Contract, Broward County, FL Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency system upgrade to the County Courthouse. City of Miami Continuing Services Contract, Miami, FL Project Caine, Inc. provided MEP services on various projects for the City of Miami including the renovation to the pump room for the Gibson Park Pool and the renovation of the Roberto Clemente Community Center. Pompano Beach Continuing Services Contract, Pompano Beach, FL Project Caine, Inc. is providing MEP services under this continuing services contract which consists of various miscellaneous engineering projects. Fort Lauderdale Airport Continuing Services Contract, Fort Lauderdale, FL As part of the Parson's team for the continuing services contract at the airport for construction management, Project Caine, Inc. provided MEP services on numerous projects. FAU Continuing Engineering Services Contract, Boca Raton, FL Project Caine, Inc. provided MEP services on numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. FlU Continuing Services Contract, Miami, FL Project Caine, Inc. provided MEP services on numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. City of Hallandale Adult Center, Hallandale, FL Project Caine, Inc. provided MEP services for the electrical design included lighting and power for two soccer fields and one baseball ball field. Lighting was designed to achieve 50 foot-candles on the fields per the city standards. T responsive engineering rorectTCAINE ~~m ~~ Education Yale University, B.E. Mechanical Engineering, 1954 Yale University, B.S. Industrial Administration, 1954 Professional Affiliations Registrations Professional Engineer, New Jersey Professional Engineer, Florida Professional Engineer, Virginia Technical Societies American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. Project Caine, Inc. 1948 East Sunrise Blvd. Suite 1 Fort Lauderdale, FL 33304 Phone: 954.767.8886 Fax: 954.767.9934 E-fax: 954.337.4665 Experience STRENGTHS Experience in mechanical work includes responsibility for design, field supervision and trouble - shooting of numerous industrial and commercial heating, ventilating and air conditioning installations, ranging from minimum size of 50 tons to installations over 2,000 tons. Other systems include constant temperature - humidity rooms, low temperature rooms and freezers, low temperature rooms, dust collections systems, high pressure piping systems, service piping, process piping and plumbing Background as a test and balance engineer as well as design engineer has led to forensic engineering experience as expert witness for both plaintiff and defense attorneys. Areas of litigation have included piping system corrosion, high humidity's, mold and mildew, pumping deficiencies, condensation and inadequate HVAC capacities. As test and balance consultant for Broward County School System, much work has been done in solving poor IAQ schools, both inadequate ventilation and mold and mildew. Nanay Community Center, Hallandale, FL Project Caine, Inc. provided the mechanical, electrical and plumbing engineering for this project. The total project cost was $3M. This project consisted of the renovation and upgrade of the existing community center in Miami Beach, Florida. The project was on two stories and each about 4000 SF. The design provided for the addition of another story and a roof deck. The project included a kitchen, bathrooms, offices, recreational areas, and meeting rooms. Cleveland Clinic MRI, Weston, FL. The project consisted of the addition of a 1.5 T MRI suite to the first floor of the hospital. Mechanical design included a new remote chiller to cool the magnet. The electrical design consisted of direct and indirect lighting, power distribution and state of the art low voltage systems. All equipment and materials had to be non- ferrous. The room was designed with a magnetic shield surrounding it. This project required an AHCA stage II stand up review. T responsive engineering ~ .ewCAINE 1iarn~~ ~1.I~mm~l?~ Education Background Certified in Plumbing Engineering Professional Affiliations Mr. Lund has over 25 years of professional experience. His diverse project portfolio includes educational facilities, medical facilities, office buildings, senior living facilities, airports, courthouses, and hospitality buildings. American Society of Plumbing Engineers Experience Broward County Continuing Services Contract, Broward County, FL Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency system upgrade to the County Courthouse. City of Miami Continuing Services Contract, Miami, FL Project Caine, Inc. provided MEP services on various projects for the City of Miami including the renovation to the pump room fpr the Gibson Park Pool and the renovation of the Roberto Clemente Community Center. Pompano Beach Continuing Services Contract, Pompano Beach, FL Project Caine, Inc. is providing MEP services under this continuing services contract which consists of various miscellaneous engineering projects. Fort Lauderdale Airport Continuing Services Contract, Fort Lauderdale, FL As part of the Parson's team for the continuing services contract at the airport for construction management, Project Caine, Inc. provided MEP services on numerous projects. FAU Continuing Engineering Services Contract, Boca Raton, FL Project Caine, Inc. provided MEP services on numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. FlU Continuing Services Contract, Miami, FL Project Caine, Inc. provided MEP services on numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. Project Caine, Inc. 1948 East Sunrise Blvd. Suite 1 Fort Lauderdale, FL 33304 Phone: 954.767.8886 Fax: 954.767.9934 E-fax: 954.337.4665 City of Hallandale Adult Center, Hallandale, FL Project Caine, Inc. provided MEP services for the electrical design included lighting and power for two soccer fields and one baseball ball field. Lighting was designed to achieve 50 foot-candles on the fields per the city standards. T responsive engineering ~ "eaTCAINE ~~c~ ~,~Iil""r,fI,~ Education GMI Engineering & Management Institute, 1999 Professional Affiliations IEEE, Computer Society, 2001 Project Caine, Inc. 1948 East Sunrise Blvd. Suite 1 Fort Lauderdale, FL 33304 Phone: 954.767.8886 Fax: 954.767.9934 E-fax: 954.337.4665 Experience Broward County Continuing Services Contract, Broward County, FL Project Caine, Inc. has been working with Singer Architects and BHA Architectural Consultants on two continuing services contracts with Broward County for the past (2) two years. Projects include office renovations, escalator upgrades, and an emergency system upgrade at the County Courthouse. Pompano Beach Continuing Services Contract, Pompano Beach, FL Project Caine, Inc. is providing MEP services under this continuing services contract which consists of various miscellaneous engineering projects. FAU Continuing Engineering Services Contract, Boca Raton, FL Project Caine, Inc. provided MEP services on numerous small renovation projects such as offices, laboratories, gymnasiums, lighting studies, lightning protection studies and design, fire alarm systems, etc. FlU Continuing Services Contract, Miami, FL Project Caine, Inc. provided MEP services on numerous small renovations at the university which included laboratories, gymnasiums, offices and classrooms. Sad kin Community Center, Lauderhill, FL Project Caine, Inc. provided the mechanical, electrical, and plumbing design for the renovation of the existing Sad kin Community Center. The project is a two- story Community Center with approximately 6,800 SF on each floor. The existing roof top units were replaced. Only selected areas were renovated. Most of the first floor ceiling was replaced. New lighting was provided. New ductwork was provided. Nanay Community Center, Hallandale, FL Project Caine, Inc. provided the mechanical, electrical and plumbing engineering for this project. The total project cost was $3M. This project consisted of the renovation and upgrade of the existing community center in Miami Beach, Florida. The project was on two stories and each about 4000 SF. The design provided for the addition of another story and a roof deck. The project included a kitchen, bathrooms, offices, recreational areas, and meeting rooms. T responsive engineering SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1. This sworn statement is submitted to City of Sunny Isles Beach, Miami-Dade County, Florida by Robert Caine, PE for Project Caine Inc. whose business address is 1948 E. Sunrise Blvd., Suite 1, Fort Lauderdale, FL 33304 and (if applicable) its Federal Employer Identification Number (FEIN) 202188140 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 2. I understand that a "public entity crime" as defined in Section 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or of the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3. I understand that "convicted" or "conviction" as defmed in Section 287.133(l)(b), Florida Statutes means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contenders. 4, I understand that an "affiliate" as defined in Section 287.133(l)(a), Florida Statutes, means: a. A predecessor or successor of a person convicted of a public entity crime; or b. An entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair market value under an arm's length agreement, shall be a prima 12 facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5. I understand that a "person" as defmed in Section 287.133(l)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding contract and which bids or applies to bid on contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "person" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6. Based on information and belief, the statement which I have marked below is true in a relation to the entity submitting this sworn statement. (please indicate which one (1) of the following three (3) statements is applicable.) m (1) Neither the entity submitting this sworn statement, nor any of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. il(2) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. il(3) The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or agents who are active in management of the entity, or any affiliate of the entity has been charged with and convicted of a public entity crime within the past 36 months. However, there has been a subsequent proceeding before a Hearing Officers of the State of Florida, Division of Administrative Hearings and the Final Order by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attached is a copy of the fmal order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THE PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED AND FOR THE PERIOD OF THE CONTRACT ENTERED INTO, WHICHEVER PERIOD IS LONGER. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES FOR THE CATEGORY TWO OF ANY CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. 13 Robert Caine. PE (printed or Typed Legal Name of Affiant) State of Florida of County of Miami-Dade :2;::: -1'-\~ Sworn to and subscribed before me this :..J day of 20lQ pb::-aJ- (' 6';--,\ e _ - - , NotarySeaJ: ~O, ~~ ....~.:;..rrt".,. SUSAN A. HERNANDEZ :~~'ib.''1;~ MY COMMISSION' DO 701326 ~i.~.~1 EXPIRES: Augusl2. 2011 :"~~.9{.:n-~"" Bond~d Thru Notar; Public Underwriters Notary's Name Printed, Stamped or Typed Personally Known: ~ or Produced Identification IT Identification Produced by 14 NON-COUUSIVE AFFIDA VIT State of Florida) County of Miami-Dade) Robert Caine, PE being first duly sworn, deposes and says that: (1) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid; (2) He/she is fully informed respecting the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid; (3) Such Bid is genuine and is not a collusive or sham Bid; (4) Neither the said bidder nor any of its officers, partners, owners, agents, representatives, employees or parties in interest, including this affiant, have in any way colluded, conspired, connived or agreed, directly or indirectly, with any other Bidder, firm, or person to submit a collusive or sham Bid in connection with the Work for which the attached Bid has been submitted; or to refrain from bidding in connection with such Work; or have in any manner, directly or indirectly, sought by agreement or collusion, or communication, or conference with any Bidder, firm, or person to fix the price or prices in the attached Bid or of any other Bidder, or to fix any overhead, profit, or cost elements of the Bid price or the Bid price of any other Bidder, or to secure through any collusion, conspiracy, connivance, or unlawful agreement any advantage against the City of Sunny Isles Beach, Florida, or any person interested in the proposed Work; (5) e price or prices quoted in the attached Bid are fair and proper and are not tainted by any co sion, ons acy, connivance, or unlawful agreement on the part of the Bidder or any other f its ent representatives, owners, employees or parties in interest, including this Affi t. Robert Caine, PE, President (Printed or Typed Legal Name of Affiant) 20 State of Florida of County of Miami - Dade Sworn to and subscribed before me this d.. S day of 'o'r\ o/f K~ C~n{ U NO~:"~ (1, dJ~J-{ ...~\r;:"" SUSAN A. HERNANDEZ :~;l'~~. MY COMMISSION 11 00 701326 ~.A~j EXPIRES: August 2,2011 '~~~~F,f:.n~""" Bondtld Thru Notary Public UndelWriters Notary's Name Printed, Stamped or Typed Personally Known: JZL or Produced Identification IT Identification Produced , 20_by 21 Colleges and Universities r--~- Visually inspiring and environmentally conscious are what Project Caine captures on and off campus; Achieving high marks in creativity, form and function. C"_- 1.f~ ': I~) _. Residential Project Caine engineers system designs that reflect true attention to detail, quality and individual comfort. Total integration of mechanical, electrical, plumbing and fire protection is the first consideration in all of their project solutions.